Anda di halaman 1dari 52

DAFTAR HARGA BAHAN SATUAN DAN UPAH PEKERJA

PEKERJAAN : Pembangunan Rumah Type 57,25


LOKASI : WAENA-ABEPURA
TAHUN : 2012

NO. URAIAN SATUAN HARGA (Rp.)

I. BAHAN
1 Batu Gunung/Kali m3 240,000.00
2 Batu Tela bh 2,200.00
3 Batu pecah lokal m3 360,000.00
4 Pasir cor lokal m3 240,000.00
5 Pasir Pasang m3 240,000.00
6 Pasir Urug m3 240,000.00
7 Karang timbun / tanah m3 120,000.00
8 Semen (50 Kg) zak 80,000.00
9 Semen Putih kg 6,250.00
10 Keramik 10x20 m' 56,000.00
11 Keramik 20x25 / 20X20 m2 65,000.00
12 Keramik 40x40 m2 67,500.00
13 Balok Kayu Besi 5/5, 4/10 m3 4,000,000.00
14 Balok Kayu Besi 5/10, 10/10 m3 4,000,000.00
15 Papan Kayu Besi 2/20 m3 4,000,000.00
16 Balok Kayu Matoa 5/5 m3 1,800,000.00
17 Balok Kayu Matoa 5/10 m3 1,800,000.00
18 Papan Kayu Matoa 2/20 m3 1,800,000.00
19 Balok Kayu Campur untuk stutwer m3 1,800,000.00
20 Papan Begisting m3 1,800,000.00
21 Tripleks 3 mm lbr 45,000.00
22 Gypsum Board m2 125,000.00
23 Teakwood 122x244 lbr 85,000.00
24 genteng Metal / MULTYROOF lbr 31,000.00
25 nok / bubungan / jurai multyroof lbr 25,000.00
26 Kunci Pintu Tanam 2 slaag Biasa bh 90,000.00
27 Kunci Pintu Tanam 2 Slaag exlusi bh 135,000.00
28 Engsel Pintu type Kupu-kupu ring bh 10,000.00
29 Engsel Jendela type Kupu-kupu ri bh 8,000.00
30 Hak Angin Jendela bh 10,000.00
31 Handle/Tarikan Jendela bh 3,000.00
32 Grendel Besar bh 15,000.00
33 Grendel Kecil bh 10,000.00
34 Paku Kayu kg 17,000.00
35 Paku Seng/ardek kg 22,500.00
36 Paku Beton kg 40,000.00
37 Cat Tembok (ALAMLUX) kg 8,333.33
38 Cat atap kg 22,500.00
39 Cat Kilat Kayu kg 40,000.00
40 Teak Oil ltr 28,000.00
41 Minyak Cat ltr 20,000.00
42 Meni Kayu kg 17,000.00
43 Dempul Kayu kg 17,500.00
44 Plamur Tembok kg 8,000.00
45 Residu ltr 7,000.00
46 Amplas lbr 3,500.00
47 Kawat ikat beton kg 19,000.00
48 Besi beton polos kg 17,500.00
49 Mur Baut Kuda-kuda 1/2" bh 12,000.00
50 Mur Baut Angker 1/2" bh 13,000.00
51 Besi strip kuda-kuda bh 10,000.00
52 Lampu Philips XL 18 watt bh 32,000.00
53 Lampu Philips XL 20 watt BH 35,000.00
54 Viting bh 8,500.00
55 Kabel-nya m' 5,500.00
56 Saklar Ganda bh 25,000.00
57 Saklar Tunggal bh 20,000.00
58 Stop Kontak 500 watt (in bow) bh 20,000.00
59 Stop Kontak AC 1500 watt bh 40,000.00
60 Sekring Group bh 60,000.00
61 Kloset Jongkok set 135,000.00
62 Kloset duduk set 1,800,000.00
63 Kitchen sink set 300,000.00
64 Wastafel lengkap asesoris set 450,000.00
65 Kran air stainless steel putaran pla bh 20,000.00
66 Floor Drain bh 16,000.00
67 Tandon Air Veberglass Kap. 1,5 m unit 1,998,750.00
68 Tanah Humus m3 200,000.00
69 Paving Block bh 3,500.00
70 Bahan Bakar Bensin ltr 5,500.00
71 Bahan Bakar Solar ltr 5,300.00
72 Olie ltr 22,500.00
73 Minyak Tanah ltr 3,500.00
74 List Plafond Gypsum m1 21,000.00

II. UPAH PEKERJA


1 Mandor o/h 90,000.00
2 Kepala Tukang o/h 85,000.00
3 Tukang Batu o/h 80,000.00
4 Tukang Kayu o/h 80,000.00
5 Tukang Besi o/h 80,000.00
6 Tukang Listrik o/h 80,000.00
7 Tukang Cat o/h 60,000.00
8 Pekerja o/h 60,000.00
VOLUME RUMAH TYPE 57,25
WAENA-JAYAPURA

NO URAIAN P (m) L (m) T (m) LUAS (m) Ket. Penamp. VOL (m) VOL (LS) JML

I Pek. Persiapan

1 Bouplank 36.00

II Pek. Pondasi dan struktur

1 Galian Pondasi 86.50 1.20 1.00 1.20 Persegi 103.80

2 Urugan Pasir dibawah pondasi 86.50 1.20 0.05 0.06 Persegi 5.19

3 Urugan Tanah Kembali 86.50 1.20 0.05 0.06 Persegi 103.80

4 Pasangan Batu Kosong 86.50 1.20 0.15 0.18 Persegi 15.57

5 Pondasi Batu Kali 86.50 0.90 1.00 0.90 Trapesium 77.85

6 86.50 0.12 0.18 0.02 Persegi 1.43

7 sloof beton bertulang 20 x 36 86.50 0.20 0.15 0.03 Persegi 2.60

8 Kolom Praktis 12x12 T(3m) 0.12 0.12 3.00 0.01 Persegi 0.04 22.00

9 ring balok 20 x 25 86.50 0.10 0.12 0.012 Persegi 1.04

III Pek. Lantai

1 Lantai Rabat Keseluruhan 5cm 0.05 80.00 4.00

2 Lantai Keramik 40x40 dalam rumah 49.00

3 Lantai Keramik KM 1 (ukuran 20x20) 1.50 1.50 4.50 Rmh Type 57,25

4 Lantai Keramik KM 2 (uikuran 20x20) 2.50 1.50 3.75

8.25

IV Pek. Dinding

1 Pasang dinding Bt Tela 1:4 86.50 2.60 219.20

2 Pasang dinding Trasram 40 cm 49.00 0.40 19.60

3 Plesteran dinding 477.61

V Pek. Plafond
1 Plafond Rangka + Tripleks 61.25

VI Pek. Atap

1 Kuda2 Kayu Besi 1 (ada 2) 74.22 0.05 0.10 0.74 2.00

2 Kuda2 Kayu Besi 2 32.28 0.05 0.10 0.16

3 Reng 54.56 0.05 0.05 0.14

4 Gording 47.50 0.05 0.10 0.24

5 Kasau 80.75 0.05 0.05 0.20

6 Atap seng Multiroof 65.88 sudah luas

7 Bubungan 8.00

8 Listplank Papan Ky. Besi 30.50 0.20 0.02 0.24

VII Pek. Pintu dan Jendela

1
Kusen Pintu Ky. Besi

Type Pintu Panil 5.50 0.90 2.30 0.47 4.00

Type Pintu Kamar Mandi 4.50 0.80 1.85 1.48 3.00

Total 10.00 0.05 0.10 0.05 7.00

Pintu

Pintu Panil 0.80 2.00 1.60 6.40 4.00

3
Kusen Jendela

Type J1 4.10 0.90 1.60 0.15

total 4.10 0.05 0.10 0.02 4.00

Jendela

Type J1 0.80 1.50 1.20 4.80 4.00

5 Ventilasi

Type Ventilasi jendela 2.10 0.80 0.50 0.40 4.00


Type Ventilasi 2.10 0.80 0.50 0.40 2.00

Total 4.20 0.05 0.10 0.02 6.00

5.70

VIII Pek. Pengecatan

1 Cat Dinding 438.41

2 Cat Pintu, jendela, kusen pintu & jendela, ventilasi 11.40

3 Cat Plafond 61.25

4 Cat Listplank 30.50

5 Cat Mani Listplank luas 30.50

6 Cat Mani Kusen Pintu, Jendela 11.40

IX Pek. Sanitair

1 Dinding keramik KM 17.80 1.50 26.70

2 Plint Keramik Dinding KM 17.80 0.07 1.25

3 Bak KM 1 2.00 1.00

4 Bak KM 2 & 3 2.25 2.00

5 Kloset Jongkok 3.00

6 Kran 5.00

7 Septictank (2m x 3m x 2m) 2.00 3.00 2.00 1.00

8 Pipa Air bersih 1/2in 24.00

9 Pemasangan

X Pek. Listrik

1 Pemasangan instalasi listrik

2 Lampu SL 20 WATT 1.00

3 Lampu SL 18 WATT 9.00

4 Saklar Lampu Tunggal 1.00

5 Saklar Lampu Ganda 5.00

6 Stop Kontak 6.00

XI Pek. Penggantung
1 Kunci Pintu 7.00

2 Hak Angin Jendela 8.00

3 Handle Jendela 4.00

4 Engsel Pintu 21.00

5 Engsel Jendela 8.00

6 Grendel Jendela 4.00

XIII Pek. Lahan Luar

1 Teras Depan 8.00 1.00 18.75

2 Teras Samping 8.00 1.50 12.00

3 Teras Belakang 4.00 1.00 4.00

TOTAL KESELURUHAN
Harga Satuan TotaL Harga

Rp 21,530.00 Rp 775,080.00

Rp 76,625.00 Rp 7,953,675.00
Rp 306,900.00 Rp 1,592,811.00
Rp 306,900.00 Rp 31,855,299.30
Rp 384,750.00 Rp 5,990,557.50
Rp 777,490.00 Rp 60,527,596.50
Rp 306,900.00 Rp 438,179.54
Rp 3,434,391.46 Rp 8,912,245.83
Rp 3,603,311.46 Rp 3,424,587.21
Rp 3,624,391.46 Rp 3,762,118.33
TOTAL Rp 124,457,070.21

Rp 1,218,150.00 Rp 4,872,600.00
Rp 138,350.00 Rp 6,779,150.00
Rp 142,850.00 Rp 642,825.00
Rp 142,850.00 Rp 535,687.50
TOTAL Rp 12,830,262.50

Rp 95,560.70 Rp 20,947,143.39
Rp 102,107.69 Rp 2,001,310.77
Rp 122,405.00 Rp 58,461,240.03
TOTAL Rp 81,409,694.18
Rp 97,120.00 Rp 5,948,600.00

TOTAL RP 5,948,600.00

Rp 7,076,000.00 Rp 5,251,807.20
Rp 7,076,000.00 Rp 1,142,066.40
Rp 5,842,000.00 Rp 796,848.80
Rp 5,842,000.00 Rp 1,387,475.00
Rp 5,842,000.00 Rp 1,179,353.75
Rp 167,400.00 Rp 11,027,475.00
Rp 103,424.00 Rp 827,392.00
Rp 97,120.00 Rp 23,697.28
TOTAL Rp 21,636,115.43

Rp 5,771,400.00 Rp 2,019,990.00

Rp 1,094,000.00 Rp 7,001,600.00
Rp -

Rp 5,771,400.00 Rp 473,254.80

Rp 387,000.00 Rp 1,857,600.00
Rp 5,771,400.00 Rp 727,196.40

TOTAL Rp 12,079,641.20

Rp 17,417.00 Rp 7,635,699.89
Rp 39,145.00 Rp 446,057.28
Rp 27,025.50 Rp 1,655,311.88
Rp 39,145.00 Rp 1,193,922.50
Rp 14,030.00 Rp 427,915.00
Rp 14,030.00 Rp 159,871.85
TOTAL Rp 11,518,778.39

Rp 175,875.00 Rp 4,695,862.50
Rp 164,875.00 Rp 205,434.25
Rp 164,525.69 Rp 329,051.38
Rp 164,525.69 Rp 740,365.62
Rp 335,000.00 Rp 1,005,000.00
Rp 34,000.00 Rp 170,000.00
Rp 3,799,275.06 Rp 7,598,550.13
Rp 236,475.00 Rp 5,675,400.00
Rp 1,500,000.00 Rp 1,500,000.00
TOTAL Rp 21,919,663.88

Rp 194,125.00 Rp 194,125.00
Rp 191,125.00 Rp 1,720,125.00
Rp 115,625.00 Rp 115,625.00
Rp 120,625.00 Rp 603,125.00
Rp 115,625.00 Rp 693,750.00
TOTAL Rp 3,326,750.00
Rp 170,000.00 Rp 1,190,000.00
Rp 18,000.00 Rp 144,000.00
Rp 11,000.00 Rp 44,000.00
Rp 26,000.00 Rp 546,000.00
Rp 24,000.00 Rp 192,000.00
Rp 18,000.00 Rp 72,000.00
TOTAL Rp 2,188,000.00

Rp 138,350.00 Rp 2,594,062.50
Rp 138,350.00 Rp 1,660,200.00
Rp 142.850,00 Rp 571.400,00
TOTAL Rp 4,254,262.50

TOTAL KESELURUHAN Rp 302,343,918.29


ANALISA HARGA SATUAN PEKERJAAN

JENIS PEKERJAAN HARGA


(Rp.)
1 M' PASANG BOUPLANK
0.0048 m3 Papan Begisting 1,800,000.00
0.0020 m3 Balok Kayu Campur 1,800,000.00
0.0200 kg Paku Kayu 17,000.00
0.1000 o/h Pekerja 60,000.00
0.0100 o/h Tukang Kayu 80,000.00
0.0200 o/h Kepala Tukang 85,000.00
0.0050 o/h Mandor 90,000.00

1 M3 GALIAN TANAH
1.2500 o/h Pekerja 60,000.00
0.0125 o/h Mandor 90,000.00
1.0000 o/h Alat Bantu 500.00

1 M3 GALIAN PASIR
1.2000 m3 Pasir Urug 240,000.00
0.3000 o/h Pekerja 60,000.00
0.0100 o/h Mandor 90,000.00

1 M3 URUGAN TANAH KEMBALI


0.2500 m3 Analisa galian tanah 76,625.00

1 M3 URUGAN KARANG PENINGGIAN DIPADATKAN


1.2000 m3 Karang Timbun 120,000.00
0.3500 o/h Pekerja 60,000.00
0.0100 o/h Mandor 90,000.00

1 M3 PASANGAN BATU KOSONG


1.2000 m3 Batu Kali 240,000.00
1.5000 o/h Pekerja 60,000.00
0.0750 o/h Mandor 90,000.00

1 M3 PASANGAN BATU KALI CAMPURAN 1:4


0.7500 m3 Batu gunung 230,000.00
3.2570 zak Semen 70,000.00
0.2500 m3 Pasir Pasang 230,000.00
3.2000 o/h Pekerja 60,000.00
1.2000 o/h Tukang Batu 80,000.00
0.1800 o/h Kepala Tukang 85,000.00
0.1800 o/h Mandor 90,000.00
1 M2 PASANGAN BATU TELA CAMPURAN 1:4
230.0000 bh Batu Tela 2,200.00
1.7500 zak Semen 70,000.00
0.4060 m3 Pasir Pasang 230,000.00
2.0000 o/h Pekerja 60,000.00
5.0000 o/h Tukang Batu 80,000.00
0.1500 o/h Kepala Tukang 85,000.00
0.4250 o/h Mandor 90,000.00

1.0000 M2 13.529412
1 M2 PASANGAN BATU TELA CAMPURAN 1:2
230.0000 bh Batu Tela 2,200.00
2.7500 zak Semen 70,000.00
0.3300 m3 Pasir Pasang 230,000.00
2.0000 o/h Pekerja 60,000.00
5.0000 o/h Tukang Batu 80,000.00
0.1500 o/h Kepala Tukang 85,000.00
0.2250 o/h Mandor 90,000.00

1.0000 M2 13.529412
1 M2 PLESTERAN TEBAL 1,5 CM CAMPURAN 1:2
0.2144 zak Semen 70,000.00
0.0170 m3 Pasir Pasang 230,000.00
0.4000 o/h Pekerja 60,000.00
0.2000 o/h Tukang Batu 80,000.00
0.0200 o/h Kepala Tukang 85,000.00
0.0200 o/h Mandor 90,000.00

1 M2 PLESTERAN TEBAL 1,5 CM CAMPURAN 1:4


0.1540 zak Semen 70,000.00
0.0209 m3 Pasir Pasang 230,000.00
0.4000 o/h Pekerja 60,000.00
0.2000 o/h Tukang Batu 80,000.00
0.0200 o/h Kepala Tukang 85,000.00
0.0300 o/h Mandor 90,000.00

1 M2 FINISHING ACIAN
0.0500 zak Semen 70,000.00
0.0750 o/h Tukang Batu 80,000.00
0.0400 o/h Kepala Tukang 85,000.00
0.0200 o/h Mandor 90,000.00

1 M3 LANTAI RABAT BETON CAMPURAN 1:3:5 FINISHING ACIAN


0.9000 m3 Kerikil Pecah Beton 360,000.00
5.5000 zak Semen 70,000.00
0.6000 m3 Pasir Beton lokal 240,000.00
5.0000 o/h Pekerja 60,000.00
0.7500 o/h Tukang Batu 80,000.00
0.0500 o/h Kepala Tukang 85,000.00
0.0100 o/h Mandor 90,000.00

1 M3 BETON TUMBUK CAMPURAN 1:3:5


0.9000 m3 Kerikil Pecah Beton 360,000.00
4.8000 zak Semen 70,000.00
0.6000 m3 Pasir Beton lokal 240,000.00
5.0000 o/h Pekerja 60,000.00
0.5000 o/h Tukang Batu 80,000.00
0.0500 o/h Kepala Tukang 85,000.00
0.0100 o/h Mandor 90,000.00

1 M3 PEKERJAAN SPESI BETON CAMPURAN 1:2:3 + pembesian


0.8200 m3 Batu Pecah Beton 360,000.00
6.8000 zak Semen 70,000.00
45.2160 kg pembesian 29,266.00
0.5400 m3 Pasir Beton 240,000.00
6.0000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Batu 80,000.00
0.1000 o/h Kepala Tukang 85,000.00
0.0200 o/h Mandor 90,000.00

100 KG PEKERJAAN PEMBESIAN BETON


110.0000 kg Besi Beton polos 17,500.00
2.0000 kg Kawat Ikat Beton 19,000.00
6.0000 o/h Pekerja 60,000.00
6.0000 o/h Tukang Besi 80,000.00
1.2000 o/h Kepala Tukang 85,000.00
0.2400 Mandor 90,000.00

1 kg pek. Pembesian beton


1 M3 PEKERJAAN BEGISTING (CETAKAN) :
1.1000 m3 Papan Begisting 1,800,000.00
8.0000 kg Paku Kayu 17,000.00
2.0000 o/h Pekerja 60,000.00
5.0000 o/h Tukang Kayu 80,000.00
1.0000 o/h Kepala Tukang 85,000.00
0.1000 o/h Mandor 90,000.00
2.0000 o/h Tukang Bongkar/Pekerja 60,000.00
1 M3 PEKERJAAN STUT WORK
1.1000 m3 Balok Kayu Campur 1,800,000.00
4.0000 o/h Pekerja 60,000.00
2.0000 o/h Tukang Kayu 80,000.00
1.0000 o/h Kepala Tukang 85,000.00
0.1750 o/h Mandor 90,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK PONDASI TELAPAK
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.0444 m3 Pekerjaan Begisting 2,850,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK plat pondasi di bawah Pondasi Bt gunung
1.0000 m3 Spesi Beton Campuran 1:2:3 + pembesian 2,674,391.46
0.0444 m3 Pekerjaan Begisting 2,850,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK PLAT LANTAI TEBAL 12 CM
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.1667 m3 Pekerjaan Begisting 2,850,000.00
0.9163 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK PLAT TANGGA TEBAL 15 CM
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.2393 m3 Pekerjaan Begisting 2,850,000.00
0.9163 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK SLOOF 15/20
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.2667 m3 Pekerjaan Begisting 2,850,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK SLOOF 30/50
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.5600 m3 Pekerjaan Begisting 2,850,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK KOLOM DIAMETER 55
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.8865 m3 Pekerjaan Begisting 2,850,000.00
0.2449 m3 Pekerjaan Stutwerk 2,480,750.00
1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3
UNTUK KOLOM 50/50
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.9333 m3 Pekerjaan Begisting 2,850,000.00
0.2449 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK KOLOM 35/35
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.3920 m3 Pekerjaan Begisting 2,850,000.00
0.3200 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK KOLOM 12/12
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.1867 m3 Pekerjaan Begisting 2,850,000.00
0.1600 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK KOLOM 30x15
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.5600 m3 Pekerjaan Begisting 2,850,000.00
0.0800 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK BALOK LANTAI 35/65
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.1758 m3 Pekerjaan Begisting 2,850,000.00
0.4763 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK BALOK LANTAI 30/55
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.2061 m3 Pekerjaan Begisting 2,850,000.00
0.4050 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK BALOK LANTAI 20/35
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.3143 m3 Pekerjaan Begisting 2,850,000.00
0.4763 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK BALOK LANTAI 25/40
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.2600 m3 Pekerjaan Begisting 2,850,000.00
0.4763 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK RING BALOK 25/45
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.2489 m3 Pekerjaan Begisting 2,850,000.00
0.4763 m3 Pekerjaan Stutwerk 2,480,750.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK RING BALOK 12/12
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.3333 m3 Pekerjaan Begisting 2,850,000.00

1 M3 PEKERJAAN COR BETON BERTULANG CAMPURAN 1:2:3


UNTUK RING BALOK 15x20
1.0000 m3 Spesi Beton Campuran 1:2:3 2,674,391.46
0.4167 m3 Pekerjaan Begisting 2,850,000.00

1 M2 PASANGAN KERAMIK LANTAI 40x40


1.0000 m2 Keramik 40X40 67,500.00
0.1000 m3 Pasir Pasang 240,000.00
0.0200 zak Semen 80,000.00
0.2400 kg Semen Putih 6,250.00
0.2500 o/h Pekerja 60,000.00
0.2500 o/h Tukang Batu 80,000.00
0.0500 o/h Kepala Tukang 85,000.00
0.0500 o/h Mandor 90,000.00

1 M2 PASANGAN KERAMIK LANTAI 20x20 ANTI SLIP


1.0000 m2 Keramik 20x20 anti slip 65,000.00
0.1000 m3 Pasir Pasang 240,000.00
0.0200 zak Semen 80,000.00
0.2400 kg Semen Putih 6,250.00
0.3000 o/h Pekerja 60,000.00
0.3000 o/h Tukang Batu 80,000.00
0.0500 o/h Kepala Tukang 85,000.00
0.0500 o/h Mandor 90,000.00

1 M2 PASANGAN KERAMIK DINDING 20x25


1.0000 m2 Keramik 20x25 65,000.00
0.4000 zak Semen 80,000.00
0.0200 kg Semen Putih 6,250.00
0.5000 o/h Pekerja 60,000.00
0.5000 o/h Tukang Batu 80,000.00
0.0500 o/h Kepala Tukang 85,000.00
0.0500 o/h Mandor 90,000.00

1 M3 KUSEN KAYU Besi


1.1000 m3 Balok Kayu Besi 5/10 4,000,000.00
0.2000 kg Paku Kayu 17,000.00
12.0000 o/h Pekerja 60,000.00
3.6000 o/h Tukang Kayu 80,000.00
3.6000 o/h Kepala Tukang 85,000.00
0.6000 o/h Mandor 90,000.00

1 M2 JALUSI KAYU MATOA


0.0220 m3 Papan kayu matoa 1,5/10 4,000,000.00
0.5000 o/h Pekerja 60,000.00
1.0000 o/h Tukang kayu 80,000.00
0.1000 o/h Kepala tukang 85,000.00
0.0200 o/h Mandor 90,000.00

1 M2 PINTU PANIL KAYU


0.0500 m3 Papan Kayu Besi 3/25 4,000,000.00
4.0000 o/h Pekerja 60,000.00
7.0000 o/h Tukang Kayu 80,000.00
1.0000 o/h Kepala Tukang 85,000.00
0.1000 o/h Mandor 90,000.00

1 M2 DINDING PARTISI DOUBLE TEAKWOOD


0.0105 m3 Balok Kayu Besi 5/10 4,000,000.00
0.8000 lbr TEAKWOOD 85,000.00
0.0240 kg Paku Kayu 17,000.00
2.0000 o/h Pekerja 60,000.00
6.0000 o/h Tukang Kayu 80,000.00
0.6000 o/h Kepala Tukang 85,000.00
0.1000 o/h Mandor 90,000.00

1 M2 PINTU DOUBLE TEAKWOOD


0.0300 m3 Papan Kayu Besi 3/25 4,000,000.00
0.8000 lbr TEAKWOOD 85,000.00
0.0240 kg Paku Kayu 17,000.00
2.0000 o/h Pekerja 60,000.00
6.0000 o/h Tukang Kayu 80,000.00
0.6000 o/h Kepala Tukang 85,000.00
0.1000 o/h Mandor 90,000.00

1 M2 MENGETER/RESIDU KAYU 2x
0.4500 kg Residu 7,000.00
0.1500 o/h Pekerja 60,000.00
0.0050 o/h Mandor 90,000.00

10 M2 CAT TEMBOK UNTUK DINDING 3x


4.5000 kg Cat Tembok 8,333.33
1.0000 ls Alat bantu 1,500.00
0.7000 o/h Pekerja 60,000.00
0.1000 o/h Tukang Cat 60,000.00
0.0010 o/h Kepala Tukang 85,000.00

1 m2 Cat Tembok
10 M2 CAT PLAFOND 3x
4.5000 kg Cat Tembok 8,333.33
1.0000 ls Alat bantu 1,500.00
0.7000 o/h Pekerja 60,000.00
0.1500 o/h Tukang Cat 60,000.00
0.0010 o/h Kepala Tukang 85,000.00

1 m2 Cat Plafond
10 M2 PLAMUR TEMBOK
0.8000 kg Plamur Tembok 8,000.00
10.0000 lbr Amplas Kayu 3,500.00
0.2000 o/h Pekerja 60,000.00
0.0020 o/h Mandor 90,000.00

1 m2 Plamur Tembok
10 M2 CAT ATAP UNTUK 3x
6.5000 kg Cat atap 22,500.00
1.5000 o/h Pekerja 60,000.00
0.1000 o/h Tukang Cat 60,000.00
0.0150 o/h Kepala Tukang 85,000.00

1 m2 Cat atap

1 M2 CAT DASAR/MENI
0.2000 kg Meni Kayu 17,000.00
0.1000 ltr Tinner 20,000.00
0.0500 o/h Pekerja 60,000.00
0.0750 o/h Tukang Cat 60,000.00
0.0080 o/h Kepala Tukang 85,000.00
0.0050 o/h Mandor 90,000.00

1 M2 CAT KILAT KAYU


0.4250 kg Cat Kilat Kayu 40,000.00
0.0750 ltr Minyak Cat 20,000.00
0.0800 kg Dempul 17,500.00
1.7500 lbr Amplas 3,500.00
0.2000 o/h Tukang Cat 60,000.00
0.0100 o/h Kepala Tukang 85,000.00
0.0030 o/h Mandor 90,000.00

1 M2 PEKERJAAN Dempul
0.2000 ltr Dempul 28,000.00
0.0800 lbr Amplas 17,500.00
0.1500 o/h Tukang 60,000.00
0.0130 o/h Mandor 90,000.00

PASANG 1 BH KUNCI PINTU TANAM 2 SLAAG BIASA


1.0000 bh Kunci Pintu Tanam 2 Slaaf (exlusive) 90,000.00
1.0000 o/h Tukang Kayu 80,000.00

PASANG 1 BH ENGSEL PINTU


1.0000 bh Engsel Pintu Type Kupu-kupu Ring Nylon 4" 10,000.00
0.2000 o/h Tukang Kayu 80,000.00

PASANG 1 BH ENGSEL JENDELA


1.0000 bh Engsel Jendela Type Kupu-kupu Ring Nylon 3" 8,000.00
0.2000 o/h Tukang Kayu 80,000.00

PASANG 1 BH HAK ANGIN JENDELA


1.0000 bh Hak angin jendela 10,000.00
0.1000 o/h Tukang Kayu 80,000.00

PASANG 1 BH HANDLE JENDELA


1.0000 bh Handle jendela 3,000.00
0.1000 o/h Tukang Kayu 80,000.00

PASANG 1 BH GRENDEL PINTU


1.0000 bh Grendel Besar 15,000.00
0.1000 o/h Tukang Kayu 80,000.00

PASANG 1 BH GRENDEL JENDELA


1.0000 bh Grendel Kecil 10,000.00
0.1000 o/h Tukang Kayu 80,000.00

PASANG 1 BH KRAN AIR STAINLESS STEEL PUTARAN PLASTIK CLEAR


1.0000 bh Kran Air Stainless Steel Putaran Plastik Clear 20,000.00
0.1000 o/h Pekerja 60,000.00
0.1000 o/h Tukang Batu 80,000.00
PASANG 1 BH KLOSET JONGKOK
1.0000 bh Kloset Jongkok 135,000
2.0000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Batu 80,000.00

PASANG 1 BH KLOSET DUDUK


1.0000 bh Kloset Duduk 1,800,000.00
2.0000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Batu 80,000.00

PASANG 1 BH WASTAFEL
1.0000 bh Wastafel 450,000.00
2.0000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Batu 80,000.00

PASANG 1 BH KITCHEN SINK


1.0000 bh Kitchen sink 300,000.00
2.0000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Batu 80,000.00

PASANG 1 BH FLOOR DRAIN


1.0000 bh Floor Drain 16,000.00
0.1000 o/h Tukang Batu 80,000.00

PASANG 1 TITIK LAMPU PHILIPS XL 18 WATT


1.0000 bh Lampu Philips XL 18 watt 32,000.00
1.0000 bh Viting 8,500.00
5.0000 m' Kabel 5,500.00
0.5000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Listrik 80,000.00
0.0750 o/h Kepala Tukang 85,000.00
0.0750 o/h Mandor 90,000.00

PASANG 1 TITIK LAMPU TL 1x40 WATT LENGKAP ARMATUR


1.0000 bh Lampu XL 20 watt 35,000.00
1.0000 bh Viting 8,500.00
5.0000 m' Kabel 5,500.00
0.5000 o/h Pekerja 60,000.00
1.0000 o/h Tukang Listrik 80,000.00
0.0750 o/h Kepala Tukang 85,000.00
0.0750 o/h Mandor 90,000.00

PASANG 1 TITIK SAKLAR GANDA


1.0000 bh Saklar Ganda 25,000.00
5.0000 m' Kabel 5,500.00
0.2500 o/h Pekerja 60,000.00
0.5000 o/h Tukang Listrik 80,000.00
0.0750 o/h Kepala Tukang 85,000.00
0.0750 o/h Mandor 90,000.00

PASANG 1 TITIK SAKLAR TUNGGAL


1.0000 bh Saklar Tunggal 20,000.00
5.0000 m' Kabel 5,500.00
0.2500 o/h Pekerja 60,000.00
0.5000 o/h Tukang Listrik 80,000.00
0.0750 o/h Kepala Tukang 85,000.00
0.0750 o/h Mandor 90,000.00

PASANG 1 TITIK STOP KONTAK


1.0000 bh Stop kontak 20,000.00
5.0000 m' Kabel 5,500.00
0.2500 o/h Pekerja 60,000.00
0.5000 o/h Tukang Listrik 80,000.00
0.0750 o/h Kepala Tukang 85,000.00
0.0750 o/h Mandor 90,000.00

1 M3 KUDA-KUDA KAYU besi


1.1000 m3 Balok Kayu Besi 5/10 4,000,000.00
8.0000 o/h Pekerja 60,000.00
24.0000 o/h Tukang Kayu 80,000.00
2.4000 o/h Kepala Tukang 85,000.00
0.8000 o/h Mandor 90,000.00

1 M3 PASANG GORDING KAYU Besi


1.1000 m3 Balok Kayu Besi 5/10 4,000,000.00
0.4000 kg Paku Kayu 17,000.00
12.0000 o/h Pekerja 60,000.00
8.0000 o/h Tukang Kayu 80,000.00
0.8000 o/h Kepala Tukang 85,000.00
0.0800 o/h Mandor 90,000.00

1 M2 PASANG ATAP GENTENG METAL


3.0000 lbr Metal Roof 31,000.00
0.0044 m3 Kasau Kayu matoa 5/5 4,000,000.00
0.0041 m3 Reng kayu Matoa 5*2,5 4,000,000.00
0.2500 kg Paku SENG 22,500.00
0.2000 o/h Pekerja 60,000.00
0.2500 o/h Tukang Kayu 80,000.00
0.0250 o/h Kepala Tukang 85,000.00
0.0100 o/h Mandor 90,000.00

1 M' PASANG PENUTUP NOK/BUBUNGAN SENG PLAT


1.1000 bh Seng Plat BJLS 0.3 57,750.00
0.0088 m3 Papan Kayu besi 2/20 4,000,000.00
0.0200 kg Paku Seng 22,500.00
0.0200 kg Paku kayu 17,000.00
0.0200 o/h Pekerja 60,000.00
0.0300 o/h Tukang Kayu 80,000.00
0.0030 o/h Kepala Tukang 85,000.00
0.0006 o/h Mandor 90,000.00
1 m'
1 M' PASANG VERTIKAL FLASHING
1.1000 bh Seng Plat BJLS 0.3 #REF!
0.0044 m3 Papan Kayu besi 2/20 4,000,000.00
0.0100 kg Paku Seng 22,500.00
0.0100 kg Paku kayu 17,000.00
0.0200 o/h Pekerja 60,000.00
0.0200 o/h Tukang Kayu 80,000.00
0.0020 o/h Kepala Tukang 85,000.00
0.0060 o/h Mandor 90,000.00
1 m'
10 M' TALANG /JURAI SENG PLAT BJLS 0.3
22.0000 m' Seng Plat BJLS 0.3 #REF!
0.4500 kg Paku Seng 22,500.00
1.0000 kg Paku Kayu 17,000.00
0.1760 m3 Papan Kayu Matoa 2/20 1,500,000.00
0.1089 m3 Balok Kayu Besi 4,000,000.00
2.5000 o/h Pekerja 60,000.00
5.0000 o/h Tukang Kayu 80,000.00
0.0250 o/h Kepala Tukang 85,000.00

1 m'
1 M' LISPLANK KAYU DIKETAM HALUS
0.0088 m3 Papan Kayu Besi 2/20 4,000,000.00
0.1500 kg Paku Kayu 17,000.00
0.6250 o/h Pekerja 60,000.00
0.3125 o/h Tukang Kayu 80,000.00
0.0313 o/h Kepala Tukang 85,000.00
0.0060 o/h Mandor 90,000.00

1 M2 PASANG PLAFOND TRIPLEKS TEBAL 3 MM


0.0160 m3 Balok Kayu Matoa 5/10, 5/5 1,500,000.00
0.3500 lbr Tripleks tebal 3 mm 45,000.00
0.0300 kg Paku Kayu 17,000.00
0.2800 o/h Pekerja 60,000.00
0.4000 o/h Tukang Kayu 80,000.00
0.0800 o/h Kepala Tukang 85,000.00
0.0140 o/h Mandor 90,000.00

1 M2 PASANG LIST PLAFOND Gypsum


1.1000 m3 List plafond 21,000.00
0.0270 kg Paku Kayu 17,000.00
0.1000 o/h Pekerja 60,000.00
0.0500 o/h Tukang Kayu 80,000.00
0.0050 o/h Kepala Tukang 85,000.00
0.0025 o/h Mandor 90,000.00

1 M' PEKERJAAN SALURAN AIR HUJAN


0.1125 m3 Galian Tanah keras 76,625.00
0.0400 m3 Urugan pasir 19,156.25
0.0976 m3 Pasangan Batu Tela 1:2 1,327,400.00
1.2500 m2 Plesteran Camp. 1:2 62,418.00
0.0100 m3 Cor beton tumbuk 1:3:5 1,149,150.00

PAS PLINT KERAMIK 10X40 /M2


1.0000 m2 Keramik 10x40 cm 10,500.00
0.1000 M3 Pasir pasang 240,000.00
0.0200 Zak Semen PC 117,750.00
0.2400 Kg Semen warna 3,000.00
0.3000 Oh Pekerja 3,500.00
0.3000 Oh Tukang Batu 105,000.00
0.0500 Oh Kepala tukang batu 95,000.00
0.0500 Oh Mandor 1,800,000.00

PIPA AIR BERSIH dia 3/4" / M'


0.2000 Btg Pipa GIP 3/4" + Accesories 87,000.00
0.3500 Set Tools 14,500.00
1.7000 Oh Pekerja 60,000.00
1.0000 Oh Tukang pipa 81,000.00
0.1000 Oh Kepala tukang pipa 85,000.00
0.2500 Oh Mandor 90,000.00

PEKERJAAN JENDELA
0.0020 M3 kayu 4,000,000.00
1.2000 M2 Kaca tebal 5mm 60,000.00
2.0000 Oh Pekerja 3,500.00
6.0000 Oh Tukang kayu 20,000.00
0.1000 Oh Mandor 1,800,000.00
PEKERJAAN SEPTICTANK
16.0000 m' Pasang bouwplank 21,530.00
3.9758 m3 Galian tanah septicktank 76,625.00
0.3040 m3 Urugan pasir dasar lantai 6,000.00
10.2400 m2 Pasangan batu tela 1pc : 2psr 102,107.69
10.2400 m2 Plesteran dinding 1pc : 2psr 62,418.00
0.3300 m3 Plat beton penutup 2,800,855.46
8.0000 m' Pipa PVC 4 " 55,350.00
2.0000 m' Pipa penguapan GIV dia. 1,5 " 44,750.00
2.0000 Oh Pekerja 3,500.00
AAN

JML. HARGA
(Rp.)

8,640.00
3,600.00
340.00
6,000.00
800.00
1,700.00
450.00
21,530.00

75,000.00
1,125.00
500.00
76,625.00

288,000.00
18,000.00
900.00
306,900.00

19,156.25
19,156.25

144,000.00
21,000.00
900.00
165,900.00

288,000.00
90,000.00
6,750.00
384,750.00

172,500.00
227,990.00
57,500.00
192,000.00
96,000.00
15,300.00
16,200.00
777,490.00

506,000.00
122,500.00
93,380.00
120,000.00
400,000.00
12,750.00
38,250.00
1,292,880.00
95,560.70

506,000.00
192,500.00
75,900.00
120,000.00
400,000.00
12,750.00
20,250.00
1,327,400.00
102,107.69

15,008.00
3,910.00
24,000.00
16,000.00
1,700.00
1,800.00
62,418.00

10,780.00
4,807.00
24,000.00
16,000.00
1,700.00
2,700.00
59,987.00

3,500.00
6,000.00
3,400.00
1,800.00
14,700.00

324,000.00
385,000.00
144,000.00
300,000.00
60,000.00
4,250.00
900.00
1,218,150.00

324,000.00
336,000.00
144,000.00
300,000.00
40,000.00
4,250.00
900.00
1,149,150.00

295,200.00
476,000.00
1,323,291.46
129,600.00
360,000.00
80,000.00
8,500.00
1,800.00
2,674,391.46

1,925,000.00
38,000.00
360,000.00
480,000.00
102,000.00
21,600.00
2,926,600.00
29,266.00

1,980,000.00
136,000.00
120,000.00
400,000.00
85,000.00
9,000.00
120,000.00
2,850,000.00
1,980,000.00
240,000.00
160,000.00
85,000.00
15,750.00
2,480,750.00

2,674,391.46
126,464.00
2,800,855.46

2,674,391.46
126,464.00
2,800,855.46

2,674,391.46
474,981.00
2,273,111.23
5,422,483.68

2,674,391.46
682,043.56
2,273,111.23
5,629,546.25

2,674,391.46
760,000.00
3,434,391.46

2,674,391.46
1,596,000.00
4,270,391.46

2,674,391.46
2,526,601.00
607,530.22
5,808,522.67
2,674,391.46
2,660,000.00
607,530.22
5,941,921.67

2,674,391.46
1,117,200.00
793,840.00
4,585,431.46

2,674,391.46
532,000.00
396,920.00
3,603,311.46

2,674,391.46
1,596,000.00
198,460.00
4,468,851.46

2,674,391.46
501,098.90
1,181,457.19
4,356,947.54

2,674,391.46
587,272.73
1,004,703.75
4,266,367.93

2,674,391.46
895,714.29
1,181,457.19
4,751,562.93

2,674,391.46
741,000.00
1,181,457.19
4,596,848.64

2,674,391.46
709,333.33
1,181,457.19
4,565,181.98

2,674,391.46
950,000.00
3,624,391.46

2,674,391.46
1,187,500.00
3,861,891.46

67,500.00
24,000.00
1,600.00
1,500.00
15,000.00
20,000.00
4,250.00
4,500.00
138,350.00

65,000.00
24,000.00
1,600.00
1,500.00
18,000.00
24,000.00
4,250.00
4,500.00
142,850.00

65,000.00
32,000.00
125.00
30,000.00
40,000.00
4,250.00
4,500.00
175,875.00

4,400,000.00
3,400.00
720,000.00
288,000.00
306,000.00
54,000.00
5,771,400.00

88,000.00
30,000.00
80,000.00
8,500.00
1,800.00
208,300.00

200,000.00
240,000.00
560,000.00
85,000.00
9,000.00
1,094,000.00

42,000.00
68,000.00
408.00
120,000.00
480,000.00
51,000.00
9,000.00
770,408.00

120,000.00
68,000.00
408.00
120,000.00
480,000.00
51,000.00
9,000.00
848,408.00

3,150.00
9,000.00
450.00
12,600.00

37,500.00
1,500.00
42,000.00
6,000.00
85.00
87,085.00
17,417.00

37,500.00
1,500.00
42,000.00
9,000.00
85.00
90,085.00
27,025.50

6,400.00
35,000.00
12,000.00
180.00
53,580.00
16,074.00

146,250.00
90,000.00
6,000.00
1,275.00
243,525.00
73,057.50

3,400.00
2,000.00
3,000.00
4,500.00
680.00
450.00
14,030.00

17,000.00
1,500.00
1,400.00
6,125.00
12,000.00
850.00
270.00
39,145.00

5,600.00
1,400.00
9,000.00
1,170.00
17,170.00

90,000.00
80,000.00
170,000.00

10,000.00
16,000.00
26,000.00

8,000.00
16,000.00
24,000.00

10,000.00
8,000.00
18,000.00

3,000.00
8,000.00
11,000.00

15,000.00
8,000.00
23,000.00

10,000.00
8,000.00
18,000.00

20,000.00
6,000.00
8,000.00
34,000.00

135,000.00
120,000.00
80,000.00
335,000.00

1,800,000.00
120,000.00
80,000.00
2,000,000.00

450,000.00
120,000.00
80,000.00
650,000.00

300,000.00
120,000.00
80,000.00
500,000.00

16,000.00
8,000.00
24,000.00

32,000.00
8,500.00
27,500.00
30,000.00
80,000.00
6,375.00
6,750.00
191,125.00

35,000.00
8,500.00
27,500.00
30,000.00
80,000.00
6,375.00
6,750.00
194,125.00

25,000.00
27,500.00
15,000.00
40,000.00
6,375.00
6,750.00
120,625.00

20,000.00
27,500.00
15,000.00
40,000.00
6,375.00
6,750.00
115,625.00

20,000.00
27,500.00
15,000.00
40,000.00
6,375.00
6,750.00
115,625.00

4,400,000.00
480,000.00
1,920,000.00
204,000.00
72,000.00
7,076,000.00

4,400,000.00
6,800.00
720,000.00
640,000.00
68,000.00
7,200.00
5,842,000.00

93,000.00
17,500.00
16,250.00
5,625.00
12,000.00
20,000.00
2,125.00
900.00
167,400.00

63,525.00
35,200.00
450.00
340.00
1,200.00
2,400.00
255.00
54.00
103,424.00

#REF!
17,600.00
225.00
170.00
1,200.00
1,600.00
170.00
540.00
#REF!

#REF!
10,125.00
17,000.00
264,000.00
435,600.00
150,000.00
400,000.00
2,125.00
#REF!
#REF!

35,200.00
2,550.00
37,500.00
25,000.00
2,660.50
540.00
103,450.50

24,000.00
15,750.00
510.00
16,800.00
32,000.00
6,800.00
1,260.00
97,120.00

23,100.00
459.00
6,000.00
4,000.00
425.00
225.00
34,209.00

8,620.31
766.25
129,554.24
78,022.50
11,491.50
228,454.80

10,500.00
24,000.00
2,355.00
720.00
1,050.00
31,500.00
4,750.00
90,000.00
164,875.00

17,400.00
5,075.00
102,000.00
81,000.00
8,500.00
22,500.00
236,475.00

8,000.00
72,000.00
7,000.00
120000
180,000.00
387,000.00
344,480.00
304,645.68
1,824.00
1,045,582.77
639,160.32
924,282.30
442,800.00
89,500.00
7,000.00
3,799,275.06
RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PEMBANGUNAN POS SATPAM


LOKASI : KOTA RAJA, KOTA JAYAPURA

HARGA SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. )

1 2 3 4 5
I. PEKERJAAN PERSIAPAN PENDAHULUAN
1 Pengukuran dan pasang bouwplank M' 36.00 21,530.00
Sub Total
II. PEKERJAAN TANAH DAN PASIR
1 Galian Tanah pondasi M3 103.80 76,625.00
2 Urugan tanah kembali M3 103.80 306,900.00
3 Urungan pasir dibawah pondasi dan lantai M3 5.19 306,900.00

Sub Total
III. PEKERJAAN STRUKTUR
(A) STRUKTUR PONDASI
1 Pas. batu kosong (Aanstamping) M3 15.57 384,750.00
2 Pondasi Pasangan batu kali M3 77.85 777,490.00
Sub Total
(B) STRUKTUR BETON
1 Cor sloof beton 20/25 Camp 1 : 2 : 3 + Tulangan M3 0.30 2,745,270.00
2 Cor kolom 20/20 Camp 1 : 2 : 3 + Tulangan M3 0.12 2,339,733.36
3 Cor ring balok 15/20 Camp 1 : 2 : 3 + Tulangan M3 0.17 3,852,170.90
4 Cor beton tumbuk u/ lantai M2 0.60 152,930.00
5 Beton Bertulang cor 1 : 2: 3 M3 0.12 1,834,250.00
Sub Total

HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN (
Rp. )

1 2 3 4 5
IV. PEKERJAAN DINDING DAN LANTAI
1 Pasangan dinding batu tela 1:4 M3 2.15 1,391,250.00
2
3
2 Plesteran dinding cam 1:4 M2 43.00 76,243.00
3 Pas keramik lantai 20/20 M2 4.00 283,630.00
Sub Total
V. PEKERJAAN KAYU, KUSEN, PINTU DAN JENDELA
1 Pas. kusen pintu, jendela & ventilasi M3 0.40 8,711,100.00
2 Pas jendela kaca riben M2 0.90 395,425.00
3 Pas. Kaca mati 5mm
3 Pasang pintu Panel kayu M2 1.70 904,050.00
Sub Total

HARGA SATUAN
NO. URAIAN PEKERJAAN SATUAN VOLUME
( Rp. )

1 2 3 4 5
VI. PEKERJAAN KAP DAN ATAP
1 Pek. kuda-kuda kayu klas I M3 0.06 8,042,000.00
2 Pek. Gording kayu klas I M3 0.16 3,877,400.00
3 Pas. Atap Seng M2 24.48 252,332.08
4 Pas. nok Genteng Metal M' 4.00 161,250.00
5 Pas. plafond gypsum + rangka M2 4.00 323,952.78
6 Pas. lis tepi plafond gypsum sedang M' 8.00 42,795.00
Sub Total
Total VI
VII. PEKERJAAN PENGUNCI DAN PENGGANTUNG
1 Pas kunci tanam 2 slag Unit 1.00 293,000.00
2 Pas Engsel pintu 4" Psg 1.00 42,750.00
3 Pas Engsel jendela 3" Psg 1.00 46,000.00
4 Pas Hak angin Psg 1.00 17,000.00
5 Pas Gerendel jendela Bh 1.00 27,250.00
6 Pas Gerendel Pintu Bh 1.00 40,000.00
Sub Total
Total VII

HARGA
NO. URAIAN PEKERJAAN SATUAN VOLUME SATUAN (
Rp. )

1 2 3 4 5
VIII. PEKERJAAN PENGECATAN DAN LABURAN
1 Pek cat plafond M2 11.60 22,607.50
2 Pek cat tembok luar / dalam M2 43.00 22,607.50
3 Pek cat kilat kayu M2 0.78 43,840.00

4 Pek cat meni kayu M2 0.78 21,980.00


Sub Total
Total IX
XI PEKERJAAN LISTRIK
1 Pas. Lampu SL 18 Watt Ttk 1.00 425,750.00
2 Pas. Stop kontak 200 Watt Ttk 4.00 471,750.00
3
Sub Total
Total X
X. PEKERJAAN FINISHING / PENYELESAIAN AKHIR
1 Pek. Pembersihan/perapihan bangunan + halaman Ls 1.00 500,000.00
Sub Total
AB)

TOTAL HARGA
(Rp.)

775,080.00
775,080.00

7,953,675.00
31,855,299.30
1,592,811.00

41,401,785.30

5,990,557.50
60,527,596.50
66,518,154.00

823,581.00
280,768.00
654,869.05
91,758.00

1,850,976.06

TOTAL HARGA
(Rp.)

2,991,187.50

3,278,449.00
1,134,520.00
7,404,156.50

3,484,440.00
355,882.50

1,536,885.00
5,377,207.50

TOTAL HARGA
(Rp.)

486,541.00
620,384.00
6,177,089.27
645,000.00
1,295,811.11
342,360.00
9,567,185.38
9,567,185.38

293,000.00
42,750.00
46,000.00
17,000.00
27,250.00
40,000.00
466,000.00
466,000.00

TOTAL HARGA
(Rp.)

262,247.00
972,122.50
34,195.20

17,144.40
1,285,709.10
1,285,709.10

425,750.00
1,887,000.00

2,312,750.00
2,312,750.00

500,000.00
500,000.00
REKAPITULASI
PEKERJAAN : PEMBANGUNAN RUMAH TYPE 57
LOKASI : WAENA-ABEPURA
TAHUN : 2012

NO URAIAN PEKERJAAN TOTAL HARGA (Rp)

I PEKERJAAN PERSIAPAN 775,080.00

II PEKERJAAN PONDASI DAN STRUKTUR 124,457,070.21

III PEKERJAAN ATAP 21,636,115.43

IV PEKERJAAN DINDING 81,409,694.18

V PEKERJAAN PINTU DAN JENDELA 12,079,641.20

VI PEKERJAAN LANTAI 12,830,262.50

VII PEKERJAAN PLAFOND 5,948,600.00

VIII PEKERJAAN SANITAIR 21,919,663.88

IX PEKERJAAN LISTRIK 3,326,750.00

X PEKERJAAN PENGGANTUNG 2,188,000.00

XI PEKERJAAN LAHAN LUAR 4,254,262.50

XII PEKERJAAN PENGECATAN 11,518,778.39

REAL COST 302,343,918.29


TOTAL 302,343,918.29
DIBULATKAN 302,000,000.00

Terbilang : Tiga Ratus Enam Juta Rupiah

Jayapura,
Dibuat Oleh :

TEAM PERENCANA

CV. BINTANG ARTHA


0.256357

41.16407

7.156127

26.92619

3.995331

4.243599

1.967495

7.249911

1.10032

0.723679

1.407094

3.809826

100
BOBOT REALISASI PEMBANGUNAN RUMAH TYPE 57

PEKERJAAN : PEMBANGUNAN RUMAH TYPE 57


LOKASI : WAENA-ABEPURA
TAHUN : 2012

BULAN I BULAN II
BOBOT
NO URAIAN PEKERJAAN
RENCANA 1 2 3 4 5 6

I PEKERJAAN PERSIAPAN 0.26 120.00


0.26
KUMULATIF RENCAN
II PEKERJAAN PONDASI DAN STRUKTUR 41.16 10.29 10.29 10.29 10.29

100.00
III PEKERJAAN ATAP 7.16 2.39 2.39 2.39

IV PEKERJAAN DINDING 26.93 8.98 8.98 8.98


80.00
V PEKERJAAN PLAFOND 4.00 2.00 2.50

VI PEKERJAAN LANTAI 4.24 2.12


60.00

VII PEKERJAAN PINTU DAN JENDELA 1.97

VIII PEKERJAAN SANITAIR 7.25 40.00

IX PEKERJAAN LISTRIK 1.10

X PEKERJAAN PENGGANTUNG 0.72 20.00

XI PEKERJAAN LAHAN LUAR 1.41

0.00
1 2 3 4 5 6 7
20.00

0.00
XII PEKERJAAN PENGECATAN 3.81 1 2 3 4 5 6 7
100.00
RENCANA 10.55 12.68 21.65 23.65 11.48 2.12
BOBOT RENCANA
KOMULATIF 10.55 23.22 44.88 68.53 80.00 82.12
MAH TYPE 57

BULAN II BULAN III

7 8 9 10 11 12

ULATIF RENCANA

2.12
KUMULATIF RENCANA
1.97

7.25

1.10

0.72

0.47 0.47 0.47

6 7 8 9 10 11 12
6 7 8 9 10 11 3.81
12

4.09 8.35 1.19 0.47 0.47 3.81


86.21 94.56 95.75 96.22 96.69 100.50

Jayapura,
Dibuat Oleh,
KUMULATIF RENCANA
120.00

100.00

80.00

KUMULATIF RENCANA
60.00

40.00

20.00

0.00
1 2 3 4 5 6 7 8 9 10 11 12
LATIF RENCANA

Anda mungkin juga menyukai