BASIC PRICE

DAFTAR HARGA SATUAN UPAH DAN BAHAN


TAHUN ANGGARAN 2013
TRIWULAN II
KABUPATEN SORONG

A. DAFTAR HARGA SATUAN UPAH


HARI JAM
NO URAIAN KODE
( Rp ) ( RP )
1 2 3 4 5
1 Mandor ( L 061 ) 100,000.00 14,285.71
2 Kepala Tukang ( L 073 ) 90,000.00 12,857.14
3 Tukang ( L 079 ) 85,000.00 12,142.86
4 Buruh Terampil ( L 106 ) 75,000.00 10,714.29
5 Buruh Tak Terampil ( L 101 ) 65,000.00 9,285.71
6 Mekanik ( L 071 ) 85,000.00 12,142.86
7 Pembantu Mekanik ( L 072 ) 75,000.00 10,714.29
8 Operator ( L 081 ) 90,000.00 12,857.14
9 Pembantu Operator ( L 082 ) 75,000.00 10,714.29
10 Sopir ( L 091 ) 90,000.00 12,857.14
11 Pembantu Sopir ( L 092 ) 65,000.00 9,285.71

B. DAFTAR HARGA SATUAN BAHAN


HARGA
NO URAIAN SATUAN KETERANGAN
( Rp )
1 2 3 4 5
1 Bahan Bakar Solar (BBM) Ltr 9,569.00
2 Bahan Bakar Premium (BBM) Ltr 8,590.00
3 Minyak Pelumas (Oli) Ltr 17,825.00
4 Minyak Tanah Ltr 4,500.00
5 Kayu Kelas I (Papan) M3 3,800,000.00
6 Kayu Kelas I (Balok) M3 3,500,000.00 *) 1. Harga Dimaksud
7 Kayu Kelas II (Kayu Matoa) M3 3,000,000.00 Belum Termasuk
8 Kayu Lombo M3 2,000,000.00 Biaya Angkutan
9 Kayu Bakar M3 450,000.00 Dari Toko/Quarry/
10 Batu Gunung M3 450,000.00 Borrow Area ke
11 Batu Karang M3 700,000.00 Lokasi Proyek
12 Batu Pecah 1-2 M3 450,000.00
13 Batu Pecah 2-3 M3 450,000.00
14 Batu Pecah 3-5 M3 450,000.00 2. Biaya Angkutan
15 Batu Tela / Batu Bata Merah Bh 1,500.00 Tergantung
16 Abu Batu M3 420,000.00 Pasar.
17 Pasir Cor M3 225,000.00
18 Pasir Plester M3 230,000.00
19 Pasir Pasang M3 200,000.00
20 Sirtu M3 120,000.00
21 Tanah Urug M3 50,000.00
22 Semen 50 Kg Zak 95,000.00
23 Semen 40 Kg Zak 75,000.00
24 Semen Warna 50 Kg Zak 500,000.00
25 Semen Warna 40 Kg Zak 400,000.00
26 Seng BJLS 30 6 Kaki Lbr 55,000.00
27 Seng BJLS 30 7 Kaki Lbr 65,000.00
28 Seng BJLS 30 8 Kaki Lbr 75,000.00
29 Seng BJLS 20 6 Kaki Lbr 39,000.00
30 Seng BJLS 20 7 Kaki Lbr 48,000.00
31 Seng BJLS 20 8 Kaki Lbr 56,000.00
32 Seng Multi Roof Lbr 45,000.00
33 Atap Rool Lbr 47,000.00
34 Nok Atap Lbr 35,000.00
35 Besi Beton Ulir Kg 17,600.00
36 Besi Beton Kg 16,100.00
37 Kawat Ikat (Bendrat) Kg 20,000.00
38 Paku Biasa Kg 15,000.00
39 Paku Seng Kg 25,000.00
40 Paku Tripleks Kg 20,000.00
41 Kaca Polos Bening 5 mm Lbr 210,000.00
42 Kaca Riben 5 mm Lbr 230,000.00
43 Kaca Polos Bening 3 mm Lbr 170,000.00
44 Kaca Riben 3 mm Lbr 190,000.00
45 Kaca Nako Lbr 12,000.00
46 Stang Nako 5 Lbr Set 75,000.00
47 Stang Nako 7 Lbr Set 95,000.00
48 Cat Tembok (Biasa) Kg 12,000.00
49 Cat Tembok (Metrolite) Kg 25,000.00
50 Cat Kayu Kg 45,000.00
51 Cat Meni Kg 30,000.00
52 Cat Meni Besi Kg 30,000.00
53 Minyak Cat / Tinner Kg 30,000.00
54 Plitur Kg 48,000.00
55 Plamir Kayu Kg 40,000.00
56 Dempul Kayu Kg 40,000.00
57 Plamir Tembok 4 Kg Kg 38,000.00
58 Amplas / Kertas Pasir Lbr 5,000.00
59 Tripleks 3 mm Lbr 57,000.00
60 Tripleks 4 mm Lbr 75,000.00
61 Tripleks 5 mm Lbr 85,000.00
62 Tripleks 6 mm Lbr 110,000.00
63 Tripleks 9 mm Lbr 160,000.00
64 Teakwood Pintu Lbr 105,000.00
65 Teakwood Lebar Lbr 125,000.00
66 Multi Plek 12 mm Lbr 160,000.00
67 Kloset Jongkok KIA Bh 135,000.00
68 Kloset Jongkok Biasa Bh 120,000.00
69 Kloset Duduk Bh 1,200,000.00
70 Kuas Biasa 2" Bh 6,000.00
71 Kuas Biasa 3" Bh 10,000.00
72 Kuas Rool Bh 20,000.00
73 Engsel Pintu Bh 30,000.00
74 Grendel Besar Bh 20,000.00
75 Grendel Kecil Bh 15,000.00
76 Kait angin Bh 7,500.00
77 Kawat Las 2,6 mm 10 Kg Dos 270,000.00
78 Pewarna Pelitur Bks 5,000.00
79 Teak Oil Klg 27,000.00
80 Aspal Kg 12,250.00
81 Keramik Warna 40 x 40 Dos 85,000.00
82 Keramik Polos 40 x 40 Dos 68,000.00
83 Sekring Kas 2 Grup Bh 52,000.00
84 Sekring Kas 1 Grup Bh 42,000.00
85 Kabel NYA 4 mm Eterna Rol 850,000.00
86 Kabel NYA 2 1/2 mm Eterna Rol 600,000.00
87 Isolator Tali Rami Bati / PVC Bh 15,000.00
88 Saklar Doble Bh 20,000.00
89 Saklar Engkel Bh 15,000.00
90 Stop Kontak Bh 15,000.00
91 Fitting Bh 12,000.00
92 Lampu Pijar 40 Watt Bh 7,500.00
93 Lampu Pijar 25 Watt Bh 7,500.00
94 Lampu TL 40 Watt Bh 120,000.00
95 Lampu TL 20 Watt Bh 85,000.00
96 Besi Plat 3 mm Lbr 1,500,000.00
97 Besi Plat 5 mm Lbr 1,750,000.00
98 Kran Air 1/2" PVC Bh 15,000.00
99 Seal Tip Besar Rol 5,000.00
100Sikat Besi Bh 25,000.00
101Besi Siku 3 x 3 Btg 55,000.00
102Besi Siku 4 x 4 Btg 75,000.00
103Besi Siku 5 x 5 Btg 115,000.00
104Besi Siku 6 x 6 Btg 250,000.00
105Besi Siku 7 x 7 Btg 375,000.00
106Besi Siku 10 x 10 Btg 1,100,000.00
BAHAN UNTUK PEKERJAAN INSTALASI
GEDUNG (UMUM)
1 Pipa PVC dia 1/2" M' 7,500.00
2 Pipa PVC dia 1" M' 8,750.00
3 Pipa PVC dia 2" M' 16,250.00
4 Pipa PVC dia 3" M' 33,750.00
5 Pipa PVC dia 4" M' 55,000.00
6 Pipa PVC dia 6" M' 81,000.00
7 Pipa Gip dia 1/2" M' 17,000.00
8 Pipa Gip dia 3/4" M' 23,500.00
9 Pipa Gip dia 1" M' 33,350.00
10 Pipa Gip dia 2" M' 40,000.00
11 Pipa Gip dia 3" M' 83,350.00
12 Pipa Gip dia 4" M' 125,000.00
13 Dop PVC dia 4" Bh 22,500.00
14 Dop PVC dia 3" Bh 20,000.00
15 Dop PVC dia 2" Bh 7,500.00
PIPA DAN ACC UNTUK PEKERJAAN
AIR BERSIH (BIDANG PENGAIRAN)
1 Pipa PVC RR Dia 1/2" M' 25,000.00
2 Pipa PVC RR Dia 1" M' 40,000.00
3 Pipa PVC RR Dia 2" M' 58,500.00
4 Pipa PVC RR Dia 3" M' 125,000.00
5 Pipa PVC RR Dia 4" M' 175,000.00
6 Pipa PVC RR Dia 6" M' 324,000.00
7 Pipa Gip Med A Dia 1/2" M' 55,000.00
8 Pipa Gip Med A Dia 3/4" M' 75,000.00
9 Pipa Gip Med A Dia 1" M' 90,000.00
10 Pipa Gip Med A Dia 2" M' 152,000.00
11 Pipa Gip Med A Dia 3" M' 237,000.00
12 Pipa Gip Med A Dia 4" M' 355,000.00
13 Pipa Gip Med A Dia 6" M' 625,000.00
14 Pipa Gip Med A Dia 8" M' 795,000.00
15 Pipa Gip Med A Dia 10" M' 1,100,000.00
16 Refair Sochet RR PVC 6" Bh 447,000.00
17 Refair Sochet RR PVC 4" Bh 396,000.00
18 Refair Sochet RR PVC 3" Bh 236,000.00
19 Refair Sochet RR PVC 2" Bh 163,000.00
20 Dop PVC Dia 6" Bh 165,000.00
21 Dop PVC Dia 4" Bh 115,000.00
22 Dop PVC Dia 3" Bh 71,000.00
23 Dop PVC Dia 2" Bh 55,000.00
24 Gate Valve GIP Dia 8" Bh 4,870,000.00
25 Gate Valve GIP Dia 6" Bh 3,731,000.00
26 Gate Valve GIP Dia 4" Bh 2,846,000.00
27 Gate Valve GIP Dia 3" Bh 1,512,000.00
28 Gate Valve GIP Dia 2" Bh 1,450,000.00
29 Flange GIP dia 12" Bh 369,500.00
30 Flange GIP dia 10" Bh 344,500.00
31 Flange GIP dia 8" Bh 285,500.00
32 Flange GIP dia 6" Bh 235,500.00
33 Flange GIP dia 4" Bh 202,000.00
34 Flange GIP dia 3" Bh 192,500.00
35 Flange GIP dia 2" Bh 142,000.00
36 Sochet GIP 6" Bh 185,000.00
37 Sochet GIP 4" Bh 125,000.00
38 Sochet GIP 3" Bh 90,000.00
39 Sochet GIP 2" Bh 52,000.00
40 Elbow GIP Dia 8"-90/45 Derajat Bh 540,000.00
41 Elbow GIP Dia 6"-90/45 Derajat Bh 335,000.00
42 Elbow GIP Dia 4"-90/45 Derajat Bh 190,000.00
43 Elbow GIP Dia 3"-90/45 Derajat Bh 165,000.00
44 Elbow GIP Dia 2"-90/45 Derajat Bh 110,000.00
45 Clem Sadle GIP Dia 2" x 3/4 Bh 109,000.00
46 Clem Sadle GIP Dia 2" x 1 Bh 149,000.00
47 Clem Sadle GIP Dia 3" x 2 Bh 176,000.00
48 Clem Sadle GIP Dia 4" x 3 Bh 210,000.00
49 Clem Sadle GIP Dia 2" x 2 Bh 160,000.00
50 Reduser All Flange 8" x 6" Bh 1,925,000.00
51 Reduser All Flange 6" x 4" Bh 1,555,000.00
52 Reduser All Flange 4" x 3" Bh 1,220,000.00
53 Tee All Plange 8" x 6" Bh 1,554,000.00
54 Tee All Plange 6" x 4" Bh 1,168,000.00
55 Tee All Plange 6" x 3" Bh 1,084,000.00
56 Tee All Plange 6" x 2" Bh 995,000.00
57 Tee All Plange 4" x 3" Bh 916,000.00
58 Tee All Plange 4" x 2" Bh 739,000.00
59 Tee All Plange 3" x 3" Bh 697,000.00
60 Tee All Plange 3" x 2" Bh 622,000.00
61 Water Meter Dia 3/4" Bh 1,125,000.00
62 Water Meter Dia 1/2" Bh 975,000.00
63 Profil Tank 520 Ltr Bh 1,800,000.00
64 Profil Tank 650 Ltr Bh 1,900,000.00
65 Profil Tank 800 Ltr Bh 2,000,000.00
66 Profil Tank 1.200 Ltr Bh 2,800,000.00
67 Profil Tank 2.200 Ltr Bh 5,200,000.00
68 Profil Tank 3.200 Ltr Bh 7,850,000.00
69 Profil Tank 5.200 Ltr Bh 10,750,000.00
70 Air Bersih ltr 250.00

Sorong, 01 April 2013

MENGETAHUI / MENYETUJUI Plt. KEPALA DINAS PEKERJAAN UMUM


BUPATI SORONG KABUPATEN SORONG

S U K A D I, BE
STEPANUS MALAK
NIP. 19600807 198602 1 008
DAFTAR ANALISA HARGA PEKERJAAN
TAHUN ANGGARAN : 2014

PEKERJAAN PERSIAPAN - RSNI T-12-2008

Kode Analisa : RSNI T-12-2008 (6.4)


Jenis Pekerjaan : 1 M PENGUKURAN DAN PEMASANGAN BOWPLANK
Satuan Pembayaran :M

Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Kayu Kelas II (5/5) M³ 0.020 Rp 3,000,000.00 Rp 60,000.00
2 Paku 5 cm - 12 cm Kg 0.012 Rp 20,000.00 Rp 240.00
3 Papan Kayu Kelas III M³ 0.007 Rp 2,000,000.00 Rp 14,000.00
Jumlah Harga Bahan = Rp 74,240.00
B Tenaga Kerja
1 Pekerja OH 0.100 Rp 65,000.00 Rp 6,500.00
2 Tukang Kayu OH 0.100 Rp 85,000.00 Rp 8,500.00
3 Kepala Tukang Kayu OH 0.010 Rp 95,000.00 Rp 950.00
4 Mandor OH 0.005 Rp 100,000.00 Rp 500.00
Jumlah Harga Tenaga = Rp 16,450.00

C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 90,690.00


PEKERJAAN TANAH - SNI 2835 : 2008

Kode Analisa : SNI 2835:2008 (6.1)


Jenis Pekerjaan : MENGGALI 1M3 TANAH BIASA SEDALAM 1.00 METER
Satuan Pembayaran : M³
Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
Tenaga Kerja
1 Pekerja OH 0.750 Rp 65,000.00 Rp 48,750.00
2 Mandor OH 0.025 Rp 100,000.00 Rp 2,500.00
Jumlah Harga Tenaga = Rp 51,250.00

Kode Analisa : SNI 2835:2008 (6.9)


Jenis Pekerjaan : MENGURUG KEMBALI 1 M3 GALIAN (1/3) INDEKS PEKERJAAN GALIAN
Satuan Pembayaran : M³
Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
Tenaga Kerja
1 Pekerja OH 0.250 Rp 65,000.00 Rp 16,250.00
2 Mandor OH 0.008 Rp 100,000.00 Rp 800.00
Jumlah Harga Tenaga = Rp 17,050.00
Kode Analisa : SNI 2835:2008 (6.10)
Jenis Pekerjaan : MEMADATKAN 1 M3 TANAH (PER 20 CM)
Satuan Pembayaran : M³
Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
Tenaga Kerja
1 Pekerja OH 0.500 Rp 65,000.00 Rp 32,500.00
2 Mandor OH 0.050 Rp 100,000.00 Rp 5,000.00
Jumlah Harga Tenaga = Rp 37,500.00

Kode Analisa : SNI 2835:2008 (6.11)


Jenis Pekerjaan : MENGURUG 1 M3 PASIR URUG
Satuan Pembayaran : M³
Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Pasir Urug M³ 1.200 Rp 225,000.00 Rp 270,000.00
Jumlah Harga Bahan = Rp 270,000.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp 65,000.00 Rp 19,500.00
2 Mandor OH 0.010 Rp 100,000.00 Rp 1,000.00
Jumlah Harga Tenaga = Rp 20,500.00
C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 290,500.00

Kode Analisa : SNI 2835:2008 (6.15)


Jenis Pekerjaan : MENGURUG 1 M3 TANAH URUG
Satuan Pembayaran : M³
Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Tanah Urug M³ 1.200 Rp 150,000.00 Rp 180,000.00
Jumlah Harga Bahan = Rp 180,000.00
B Tenaga Kerja
1 Pekerja OH 0.300 Rp 65,000.00 Rp 19,500.00
2 Mandor OH 0.010 Rp 100,000.00 Rp 1,000.00
Jumlah Harga Tenaga = Rp 20,500.00

C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 200,500.00


PEKERJAAN PONDASI - SNI 2836 : 2008

Kode Analisa : SNI 2836:2008 (6.3)


Jenis Pekerjaan : MEMASANG 1 M3 PONDASI BATU BELAH. CAMPURAN 1 PC : 5 PP
Satuan Pembayaran : M³

Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Batu belah 15 cm / 20 cm M³ 1.200 Rp 450,000.00 Rp 540,000.00
2 Semen (PC) Kg 136.000 Rp 1,900.00 Rp 258,400.00
3 Pasir Pasang (PP) M³ 0.544 Rp 200,000.00 Rp 108,800.00
Jumlah Harga Bahan = Rp 907,200.00
B Tenaga Kerja
1 Pekerja OH 1.500 Rp 65,000.00 Rp 97,500.00
2 Tukang Batu OH 0.750 Rp 85,000.00 Rp 63,750.00
3 Kepala Tukang Batu OH 0.075 Rp 95,000.00 Rp 7,125.00
4 Mandor OH 0.075 Rp 100,000.00 Rp 7,500.00
Jumlah Harga Tenaga = Rp 175,875.00

C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 1,083,075.00


Kode Analisa : SNI 2836:2008 (6.9)
Jenis Pekerjaan : MEMASANG 1 M3 BATU KOSONG (AANSTAMPING)
Satuan Pembayaran : M³

Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Batu belah 15 cm / 20 cm M³ 1.200 Rp 450,000.00 Rp 540,000.00
2 Pasir Urug Kg 0.432 Rp 225,000.00 Rp 97,200.00
Jumlah Harga Bahan = Rp 637,200.00
B Tenaga Kerja
1 Pekerja OH 0.780 Rp 65,000.00 Rp 50,700.00
2 Tukang Batu OH 0.390 Rp 85,000.00 Rp 33,150.00
3 Kepala Tukang Batu OH 0.039 Rp 95,000.00 Rp 3,705.00
4 Mandor OH 0.039 Rp 100,000.00 Rp 3,900.00
Jumlah Harga Tenaga = Rp 91,455.00

C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 728,655.00


PEKERJAAN BETON - SNI 7394 : 2008

Kode Analisa : SNI 7394:2008 (6.5)


Jenis Pekerjaan : MEMBUAT 1 M3 BETON MUTU f’c = 14.5 MPa (K-175). SLUMP (12 ± 2) CM. W/C = 0.66
Satuan Pembayaran : M³

Harga Jumlah
No Kebutuhan Satuan Index Satuan Harga
Rp. Rp.
A Bahan
1 Semen (PC) Kg 326.000 Rp 1,900.00 Rp 619,400.00
2 Pasir Beton (PB) Kg 760.000 Rp 2,000.00 Rp 1,520,000.00
3 Kerikil beton (maks. 30 mm) Kg 1029.000 Rp 2,000.00 Rp 2,058,000.00
4 Air Ltr 215.000 Rp 250.00 53,750.000
Jumlah Harga Bahan = Rp 4,197,400.00
B Tenaga Kerja
1 Pekerja OH 1.650 Rp 65,000.00 Rp 107,250.00
2 Tukang Batu OH 0.275 Rp 85,000.00 Rp 23,375.00
3 Kepala Tukang Batu OH 0.028 Rp 95,000.00 Rp 2,660.00
4 Mandor OH 0.083 Rp 100,000.00 Rp 8,300.00
Jumlah Harga Tenaga = Rp 141,585.00
C Jumlah Harga Bahan Dan Tenaga Kerja (A + B ) = Rp 4,338,985.00
1. Pembersihan Lokasi

Rumus :
Luas Lahan
Panjang tanah x lebar tanah
20 m x 18 m
360 m²

Pembuatan bedeng dan gudang

Rumus :
Luas Bedeng
Panjang x lebar
5m x 3m
12,5 m²

Pemasangan Daya Listrik

Rumus :
Harga daya di kota tersebut x Jml. Limit
Rp 5,000,000 x 1
Rp 5,000,000

Pengeboran Titik Air

Rumus :
Harga 1 titik sumur x Jml. Sumur
Rp 7,000,000 x 1
Rp 7,000,000

Pemasangan Bowplank

Rumus :
Panjang tanah x 2 ⁺ Lebar tanah x 2
16 m x 2 ⁺ 10 x 2
32 m ⁺ 20 m 82.5 m'
52 m'
Pekerjaan Galian Tanah Pondasi

Rumus :
Dalam pondasi x Lebar pondasi x Σ Panjang pondasi
1m x 0,9 m x 110,5 m'
99,45 m'

Urugan Pasir Bawah Pondasi Dan Bawah Lantai

Rumus :
Σ Volume pasir urug dibawah lantai + Σ Volume pasir urug di bawaah pondasi
11,572 m³

Pek. Floor Lantai di bawah keramik

Rumus :
Σ Lantai x Tebal Floor / Spesi
2,79 m³

Pas. Pondasi Batu Kosong

Rumus :
Σ Pondasi x Lebar Pas. Pondasi Batu kosong x tinggi
112,5 m x 0,8 m x 0,2 m
18 m³

Pas. Pondasi Batu Kali

Rumus :
[L. Atas + L. Bawah]
x tinggi x Σ Pondasi
2

46,962 m³

Urugan Tanah Galian :

Rumus :
1/4 Vol. Galian
Vol. Total Galian − Vol. Total Pondasi
9,533 m³

Pek. Sloof, 15 cm x 15cm

Rumus :
Σ Sloof x Lebar Sloof x Tinggi Sloof
112.5 m x 0.15 m x 0.15 m
2,531 m³

Pek. Kolom, 15 cm x 15 cm

Rumus :
Σ Tiang Kolom x [ Lebar A x Lebar B x Tinggi Kolom]
15 x [ 0,15 x 0,15 x 3,2]
15 x [ Lebar A x Lebar B x Tinggi Kolom]
15 x 0.072
1,08 m³

Pek. Ring Balok, 15 cm x 15 cm

Rumus :
Σ Ring Balok x Lebar Ring Balok x Tinggi Ring Balok
74,5 m x 0,15 m x 0,15 m
1,676 m³

Pek. Konsol Kanopi beton

Rumus :
Luasan Dak Teras x Tebal Konsol kanopi beton
15,037 m² x 0,12 m
15,037 m² x 0,12 m
1,804 m³

Volume Pasangan Batu Bata

Rumus :
Σ Sloof x Tinggi Pas. Batu Bata
55,5 m' x 3,2 m
177,6 m²

Volume plestran dan acian

Rumus :
Vol. Pas batu bata x 2
177,6 m² x 2
355,2 m²

Pekerjaan Pas. Batu Alam

Rumus :
Tinggi Pas. Batu Alam x Lebar Pas. Batu Alam
0,8 m x 12 m'
9,6 m²

Pekerjaan Pembuatan Carport

Rumus :
Panjang Carport x Lebar Carport
6,5 m x 3m
19,5 m²

Pekerjaan Pembuatan Dan Pemasangan Kusen Kayu Kls. I

Rumus :
Vol. Kusen Pintu ⁺ Vol. Kusen Jendela ⁺ Vol. Ventilasi
32,06 m ⁺ 50 m ⁺ 2,4 m
84,46 m

Pekerjaan Pembuatan Dan Pemasangan Daun Pintu Panel Dan Jendela Kaca

Rumus :
Harga Pembelian Daun Pintu Ongkos Pasang

Dari Meubel ( 20 % Dari Harga Pembelian )

Rp 750,000 ⁺ Rp 150,000

Rp 900,000
Rp 900,000

Harga Pembelian Daun Jendela Ongkos Pasang



Dari Meubel ( 20 % Dari Harga Pembelian )

Rp 500,000 ⁺ Rp 100,000

Rp 600,000

Pekerjaan kuda - kuda kayu kelas I (ukuran 6/12 cm)

Rumus :
Panjang Kebutuhan Balok Kuda - Kuda Panjang Balok
Panjang Balok Di Pasaran Di Pasaran
4 m / Btg
46,3 m 12 Btg.
>
4m
Vol. Balok
Jml balok yg akan di pakai Untuk Balok 6/12
Vol. Balok 1 m³ = 35 Btg

12 Btg
35 Btg

0,34 m³ .......Hasil

Hasil x Jml Kuda Kuda


0,34 x 3 Buah Kuda Kuda
1,02 m³

Pekerjaan Gording Kayu Kelas I (ukuran 5/10 cm)

Rumus :
Panjang Kebutuhan Balok Gording Panjang Balok
Panjang Balok Di Pasaran Di Pasaran
4 m / Btg
89,55 m 24 Btg.
>
4m
Vol. Balok
Jml balok yg akan di pakai Untuk Balok 5/10
Vol. Balok 1 m³ = 50 Btg

24 Btg
50 Btg

0,48 m³ .......Hasil
Pekerjaan Usuk Kayu Kelas I (ukuran 5/5 cm)

Rumus :
Panjang Kebutuhan Balok Usuk Panjang Balok
Panjang Balok Di Pasaran Di Pasaran
4 m / Btg
214,7 m 54 Btg.
>
4m
Vol. Balok
Jml balok yg akan di pakai Untuk Balok 5/5
Vol. Balok 1 m³ = 100 Btg

54 Btg
100 Btg

0,54 m³ .......Hasil

Pekerjaan Reng Kayu Kelas I (ukuran 4/4 cm)

Rumus :
Panjang Kebutuhan Balok Reng Panjang Balok
Panjang Balok Di Pasaran Di Pasaran
4 m / Btg
408,5 m 102 Btg.
>
4m
Vol. Balok
Jml balok yg akan di pakai Untuk Balok 4/4
Vol. Balok 1 m³ = 157 Btg

102 Btg
157 Btg

0,65 m³ .......Hasil
Pekerjaan Papan Listplank Kayu Kls I (ukuran 3/30 cm)

Rumus :
Panjang Kebutuhan Papan Listplank Panjang Papan
Panjang Papan Di Pasaran Di Pasaran
4 m / Btg
26 m 6,5 Lbr.
>
4m

26 m' .......Hasil

Pekerjaan Papan Bubungan Kayu Kls I (ukuran 3/20 cm)

Rumus :
Panjang Kebutuhan Papan Bubungan

12,25 m'

Pekerjaan Rangka Plafond Kayu Kls II (ukuran 5/5 cm)

Rumus :
Panjang Kebutuhan Rangka Plafond Panjang Balok
Panjang Balok Di Pasaran Di Pasaran
4 m / Btg
373,45 m 94 Btg.
>
4m
Vol. Balok
Jml balok yg akan di pakai Untuk Balok 5/5
Vol. Balok 1 m³ = 100 Btg

94 Btg
100 Btg
0,94 m³ .......Hasil

Pekerjaan Pafond Tripleks tebal 12 mm (ukuran 122 cm x 244 cm)

Rumus :
Jml. Lembaran Tripleks x Vol. Tripleks Vol. Plafond
Di Pasaran
2,976 m²

36 lbr x 2.976

107,17 m² .......Hasil

Pekerjaan Pemasangan Lantai Keramik (ukuran 40 cm x 40 cm)

Rumus :
Panjang Bangunan x Lebar Bangunan

90,65 m² .......Hasil

Pekerjaan Pemasangan Lantai Keramik (ukuran 20 cm x 20 cm)

Rumus :
Panjang Bangunan x Lebar Bangunan

4 m² .......Hasil

Pekerjaan Pemasangan Dinding Keramik (ukuran 20 cm x 25 cm)

Rumus :
Panjang Km / Wc x Tinggi Pas. Keramik
12,8 m² .......Hasil

Pekerjaan Acan Dinding

Rumus :
Tinggi x Panjang Dinding Luar & Dalam
3,2 m x 107 m'

342,4 m² .......Hasil

Pekerjaan Penghecatan Dinding Dalam

Rumus :
Tinggi x Panjang Dinding Dalam
3,2 m x 73 m'

233,6 m² .......Hasil

Pekerjaan Penghecatan Dinding Luar

Rumus :
Tinggi x Panjang Dinding Dalam
3,2 m x 36 m'

115,2 m² .......Hasil

Pekerjaan Pengecatan Minyak Kayu Dan Besi

Rumus :
Total Vol. Kusen ⁺ Total Vol. Listplank

15,352 m² ⁺ 7,8 m²

23,152 m²
Σ Panjang pondasi
110,5 m'

Σ Pondasi
DAFTAR RENCANA ANGGARAN BIAYA (RAB)

NO Jenis Pekerjaan Volume

I PEKERJAAN PENDAHULUAN
1 Pembersihan lokasi 360
2 Pembuatan bedeng dan gudang 12.5
3 Penyambungan daya listrik PLN 1
4 Pengeboran titik air 1
5 Pemasangan bow plank 82.5

NO Jenis Pekerjaan Volume

II PEKERJAAN PEMASANGAN PONDASI


1 Pekerjaan galian tanah pondasi (keras, sedalam = 1m) 99.45
2 Urugan pasir bawah pondasi dan bawah lantai 11.572
3 Pekerjaan floor di bawah pemasangan keramik (1 Pc : 4 Ps) 2.79
4 Pasangan pondasi batu kosong 18
5 Pasangan pondasi batu kali (1 Pc : 4 Ps) 46.962
6 Urugan tanah galian 9.533

Item - Item Pekerjaan Rencana Anggaran Biaya (RAB)

NO Jenis Pekerjaan Volume

III PEKERJAAN BETON BERTULANG & MAL


1 Pekerjaan sloof 15/15 (K.150) 2.531
2 Pekerjaan kolom utama 15/15 (K.150) 1.32
3 Pekerjaan ring balk 15/15 (K.150) 1.676
4 Pekerjaan konsol kanopi beton teras t = 12 cm (K.150) 1.804
NO Jenis Pekerjaan Volume

IV PEMASANGAN BATU BATA MERAH DAN PLESTERAN


1 Pasangan dinding batu bata merah (1 Pc : 4 Ps) 177.6
2 Pekerjaan plesteran dan acian (1 Pc : 4 Ps) 355.2
3 Pekerjaan pasangan batu alam (batu candi) 9.6
4 Pekerjaan pembuatan carport 19.5

NO Jenis Pekerjaan Volume

V PEKERJAAN PEMASANGAN KUSEN DAN PINTU


1 Pekerjaan pembuatan dan pemasangan kusen kayu kelas I (ukuran 5/10 cm) 0.422
2 Pekerjaan pemasangan daun pintu panel (kayu kls I) 6
3 Pekerjaan pemasangan daun jendela type I (kayu kelas I) 8
4 Pekerjaan pemasangan daun jendela type II (kayu kelas I) 1

Item - Item Pekerjaan Rencana Anggaran Biaya (RAB)

NO Jenis Pekerjaan Volume

VI PEKERJAAN KAYU KAP DAN ATAP


1 Pekerjaan kuda - kuda kayu kelas I (ukuran 6/12 cm) 1.02
2 Pekerjaan rangka gording kayu kelas I (ukuran 5/10 cm) 0.48
3 Pekerjaan rangka usuk kayu kelas I (ukuran 5/5 cm) 0.54
4 Pekerjaan rangka reng kayu kelas I (ukuran 4/4 cm) 0.65
5 Pekerjaan papan listpalnk kayu kelas I (ukuran 3/30 cm) 26
6 Pekerjaan pemasangan papan bubungan kayu kls I (ukuran 3/20 cm) 12.25
7 Pekerjaan pemasangan karet talang air 27
8 Pekerjaan pemasangan atap genting 159.19

NO Jenis Pekerjaan Volume

VII PEKERJAAN PLAFOND


1 Pekerjaan rangka plafond kayu kelas II (ukuran 5/5 cm) 0.94
2 Pekerjaan pembuatan dan pemasangan plafond tripleks ( t = 12 mm) 107.17
3 Pekerjaan pemasangan list plafond (profilian) 153

NO Jenis Pekerjaan Volume

VIII PEKERJAAN PEMASANGAN KERAMIK


1 Pemasangan lantai keramik (ukuran 40/40 cm) 90.65
2 Pemasangan lantai keramik (ukuran 20/20 cm) 4
3 Pemasangan dinding keramik (ukuran 20/25 cm) 12.8
4 Pemasangan kuku keramik (ukuaran 2/20 cm) 28

Item - Item Pekerjaan Rencana Anggaran Biaya (RAB)

NO Jenis Pekerjaan Volume

IX PEKERJAAN PEMBUATAN SANITASI


1 Pemasangan kloset duduk 1
2 Pemasangan keran (Ø 3/4") 1
3 Profil tank 1.200 liter 1

NO Jenis Pekerjaan Volume

X PEKERJAAN INSTALASI AIR


1 Pemasangan Pipa Air Bersih (Gip Med A Dia 1") 3
2 Pemasangan Pipa Air Kotor (Gip Med A Dia 3") 3
3 Pekerjaan pembuatan septicktank dan Sumur Resapan 1

NO Jenis Pekerjaan Volume

XI PEKERJAAN INSTALASI LISTRIK


1 Instalasi sakelar (engkel) 3
2 Instalasi sakelar (double) 3
3 instalasi stop kontak 6
4 Instalasi titik lampu 9
4 Kabel NYA 4 mm Eterna 1
5 Upah instalasi 9
Item - Item Pekerjaan Rencana Anggaran Biaya (RAB)

NO Jenis Pekerjaan Volume

XII PEKERJAAN PENGECATAN


1 Pekerjaan Acian 342.4
2 Cat dinding (dalam) 233.6
3 Cat plafond 103.147
4 Cat dinding (luar wathershiel) 115.2
5 Pengecatan minyak (kayu + besi) 23.152

NO Jenis Pekerjaan Volume

XIII PEKERJAAN PEMBERSIHAN


1 Pembersihan lahan setrelah selesai pekerjaan 160

JUML
DIB
CANA ANGGARAN BIAYA (RAB)

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
PEKERJAAN PENDAHULUAN
m² 15,000.00 5,400,000.00 s
m² 500,000.00 6,250,000.00 s
Ls 5,000,000.00 5,000,000.00 s
Unit 7,000,000.00 7,000,000.00 s
m¹ 28,000.00 2,310,000.00 s
Jumlah 25,960,000.00

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
ERJAAN PEMASANGAN PONDASI
m³ 68,200.00 6,782,490.00
m³ 260,500.00 3,014,506.00
m³ 1,255,400.00 3,502,566.00
m³ 785,460.00 14,138,280.00
m³ 1,130,100.00 53,071,756.20
m³ 42,500.00 405,152.50
Jumlah 80,914,750.70

aan Rencana Anggaran Biaya (RAB)

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
RJAAN BETON BERTULANG & MAL
m³ 1,417,220.00 3,586,983.82
m³ 1,417,220.00 1,870,730.40
m³ 1,417,220.00 2,375,260.72
m³ 1,417,220.00 2,556,664.88
Jumlah 10,389,639.82

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
AN BATU BATA MERAH DAN PLESTERAN
m² 168,850.00 29,987,760.00
m² 46,756.00 16,607,731.20
m² 221,275.00 2,124,240.00
m² 500,000.00 9,750,000.00
Jumlah 58,469,731.20

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
AAN PEMASANGAN KUSEN DAN PINTU
m³ 6,278,750.00 2,649,632.50
Unit 900,000.00 5,400,000.00
Unit 600,000.00 4,800,000.00
Unit 600,000.00 600,000.00
Jumlah 13,449,632.50

aan Rencana Anggaran Biaya (RAB)

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
KERJAAN KAYU KAP DAN ATAP
m³ 5,382,000.00 5,489,640.00
m³ 4,763,800.00 2,286,624.00
m³ 2,381,900.00 1,286,226.00
m³ 2,381,900.00 1,548,235.00
m' 69,350.00 1,803,100.00
m' 69,350.00 849,537.50
m' 45,000.00 1,215,000.00
m² 107,500.00 17,112,925.00
Jumlah 31,591,287.50

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
PEKERJAAN PLAFOND
m³ 3,600,000.00 3,384,000.00
m² 75,650.00 8,107,410.50
m¹ 40,400.00 6,181,200.00
Jumlah 17,672,610.50

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
ERJAAN PEMASANGAN KERAMIK
m² 175,870.00 15,942,615.50
m² 243,745.00 974,980.00
m² 243,745.00 3,119,936.00
m¹ 20,000.00 560,000.00
Jumlah 20,597,531.50

aan Rencana Anggaran Biaya (RAB)

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
KERJAAN PEMBUATAN SANITASI
unit 1,440,000.00 1,440,000.00
unit 36,000.00 36,000.00
unit 3,360,000.00 3,360,000.00
Jumlah 4,836,000.00

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
PEKERJAAN INSTALASI AIR
Btg 108,000.00 324,000.00
Btg 284,400.00 853,200.00
unit 10,204,250.00 10,204,250.00
Jumlah 11,381,450.00

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
EKERJAAN INSTALASI LISTRIK
ttk 15,000.00 45,000.00
ttk 20,000.00 60,000.00
ttk 150,000.00 900,000.00
ttk 120,000.00 1,080,000.00
Roll 850,000.00 850,000.00
ttk 75,000.00 675,000.00
Jumlah 3,610,000.00
aan Rencana Anggaran Biaya (RAB)

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
PEKERJAAN PENGECATAN
m² 27,625.00 9,458,800.00
m² 25,000.00 5,840,000.00
m² 25,000.00 2,578,675.00
m² 25,000.00 2,880,000.00
m² 45,000.00 1,041,840.00
Jumlah 21,799,315.00

Harga Jumlah
Satuan
Satuan (RP) Harga (RP)
PEKERJAAN PEMBERSIHAN
m² 15,000.00 2,400,000.00
Jumlah 2,400,000.00

JUMLAH TOTAL (Rp) 303,071,948.72


DIBULATKAN (Rp) 290,000.00
POLITEKNIK KATOLIK SAINT PAUL SORONG
PAPUA BARAT
TAHUN 2014

Nama : Hendry Kresnawan Kamati


Nim : 1216545
Semester : IV ( Empat )
REKAPITULASI HARGA KESELURUHAN

HARGA JUMLAH
NO JENIS PEKERJAAN VOLUME
SATUAN (Rp) HARGA (Rp)
1 PEKERJAAN PENDAHULUAN Rp 22,106,000
2 PEKERJAAN PEMASANGAN PONDASI Rp 80,914,751
3 PEKERJAAN BETON BERTULANG & MALL Rp 10,389,640
4 PEMASANGAN BATU BATA MERAH DAN PLESTERAN Rp 58,469,731
5 PEKERJAAN PEMASANGAN KUSEN DAN PINTU Rp 13,449,633
6 PEKERJAAN PEMASANGAN KAYU KAP DAN ATAP Rp 31,591,288
7 PEKERJAAN PEMASANGAN PLAFOND Rp 17,672,611
8 PEKERJAAN PEMASANGAN KERAMIK Rp 20,597,532
9 PEKERJAAN PEMBUATAN SANITASI Rp 4,836,000
10 PEKERJAAN INSTALASI AIR Rp 11,381,450
11 PEKERJAAN INSTALASI LISTRIK Rp 3,610,000
12 PEKERJAAN PENGECATAN Rp 12,340,515
13 PEKERJAAN PEMBERSIHAN Rp 2,400,000
TOTAL REKAP HARGA KESELURUHAN = Rp 289,759,149
BASIC PRICE
1 UPAH
HARGA DASAR
NO TENAGA KERJA SATUAN KETERANGAN
( RP )
1 MANDOR Org/Hr 115,000.00 8 Jam Krj / Hr
2 KEPALA TUKANG Org/Hr 110,000.00 8 Jam Krj / Hr
3 TUKANG BATU Org/Hr 100,000.00 8 Jam Krj / Hr
4 LADEN TUKANG BATU Org/Hr 75,000.00 8 Jam Krj / Hr
5 TUKANG KAYU Org/Hr 100,000.00 8 Jam Krj / Hr
6 LADEN TUKANG KAYU Org/Hr 75,000.00 8 Jam Krj / Hr
7 TUKANG CAT Org/Hr 100,000.00 8 Jam Krj / Hr
8 LADEN TUKANG CAT Org/Hr 75,000.00 8 Jam Krj / Hr
9 TUKANG BATU Org/Hr 80,000.00 8 Jam Krj / Hr
10 TUKANG BONGKAR Org/Hr 75,000.00 8 Jam Krj / Hr
11 PEKERJAAN GALIAN & URUG Org/Hr 75,000.00 8 Jam Krj / Hr
12 TUKANG LISTRIK Org/Hr 100,000.00 8 Jam Krj / Hr
13 TUKANG PIPA Org/Hr 100,000.00 8 Jam Krj / Hr

2 BAHAN
HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
1 Semen 50 Kg Zak 90,000.00 1,800.00
2 Semen 40 Kg Zak 73,000.00 1,825.00
3 Semen Putih Kg 5,000.00
4 Semen Warna Kg 8,000.00
5 Aspal Ltr 9,580.00 gudang km.13 (stock)
6 Aspal Ltr 9,169.00 gudang km.13 (indent)
7 Aspal Ltr 8,927.00 loco pelabuhan sorong (indent)
8 Abu batu M3 9,169.00 quary/stone crusher saoka
9 Pasir cor beton M3 175,000.00 quary malano
10 Pasir Pasang M3 153,000.00 quary malano
11 Pasir Pasang cuci M3 200,000.00
12 Pasir plester M3 200,000.00 quary malano
13 Pasir plester cuci M3 240,000.00
14 Pasir urug M3 36,000.00 quary malano
15 Tanah timbunan M3 36,000.00 quary malano
16 Urukan pilihan (sirtu Km.24 ) M3 80,000.00 quary km.24
17 Timbunan cadas ( Rufei ) M3 70,000.00
18 Batu karang M3 275,000.00
19 Batu belah (15-20 Cm ) M3 400,000.00
20 Batu pecah 1-2 M3 450,000.00
21 Batu pecah 2-3 (koral ) M3 450,000.00
22 Batu pecah 3-5 M3 350,000.00
23 Batu pecah 5-7 M3 350,000.00
24 Sirtu ( Km.14 ) M3 80,000.00
25 Bata merah Bh 1,400.00
26 Bata tela Bh 1,350.00
27 kayu besi kelas 1 3/30 x 400 M3 4,300,000.00
28 kayu besi kelas 1 25/20 x 400 M3 4,200,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
29 kayu besi kelas 1 6/12 x 400 M3 3,400,000.00
30 kayu besi kelas 1 5/10 x 400 M3 3,200,000.00
31 kayu besi kelas 1 5/5 x 400 M3 3,250,000.00
32 kayu kelas 2 M3 2,000,000.00
33 kayu bakar / kayu putih M3 1,500,000.00
34 seng BJLS.20 6'' Lbr 36,000.00
35 seng BJLS.20 7'' Lbr 42,000.00
36 seng BJLS.20 8'' Lbr 50,000.00
37 seng BJLS.30 6'' Lbr 59,000.00
38 seng BJLS.30 7'' Lbr 67,000.00
39 seng plat BJLS 20 Lbr 57,500.00
40 seng plat BJLS 30 Lbr 70,000.00
41 seng talang BJLS 30 M 24,000.00
42 atap plastik gelombang kecil Lbr 26,000.00
43 atap plastik gelombang besar Lbr 55,000.00
44 atap ardek gelombang kecil Lbr 55,000.00
45 atap ardek gelombang besar Lbr 52,000.00
46 atap sakura roof 2 susun Bh 36,000.00
47 atap sakura roof 3 susun Bh 50,000.00
48 nok atap sakura roof Bh 27,500.00
49 genteng pelentong Bh 2,700.00
50 genteng kodok Bh 2,600.00
51 genteng pelentong super Bh 3,000.00
52 bubungan genteng pelentong Bh 3,000.00
53 bubung genteng kodok Bh 2,800.00
54 bubung pelentong super Bh 3,400.00
55 roof fibre glass 6k Lbr 35,000.00
56 roof fibre glass 7k Lbr 40,000.00
57 roof fibre glass 8k Lbr 50,000.00
58 atap asbes gelombang L : 80 Lbr 42,000.00
59 atap asbes gelombang L : 105 Lbr 52,000.00
60 nok atap alminium Lbr 30,000.00
61 besi beton ID 5 mm - 25mm kg 10,500.00
62 besi strip 20.3 - 50.5 kg 75,000.00
63 besi plat 1 mm - 9 mm kg 550,000.00
64 besi plat 3 mm Lbr 860,000.00
65 besi plat 5 mm Lbr 1,450,000.00
66 besi siku 20.20 - 6m' s/d 9 mm kg 80,000.00
67 baja propil inp,WF kg 15,000.00
68 besi full 8 mm kg 10,000.00
69 besi full 10 mm kg 9,000.00
70 besi full 12 mm kg 9,000.00
71 besi polos 16 mm kg 10,000.00
72 besi ulir 15 mm kg 10,000.00
73 besi ulir 16 mm kg 10,000.00
74 kawat ikat RRC kg 21,000.00
75 kawat bronjong galvansir kg 22,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
76 kawat duri roll 188,000.00
77 kawat ram m' 24,000.00
78 kawat harmoni m' 85,000.00
79 kawat nyamuk plastik m' 10,000.00
80 kawat nyamuk besi m' 28,000.00
81 kawat las 2,6 unit 135,000.00
82 kawat galvansir 18,000.00
83 paku biasa kg 15,000.00
84 paku seng kg 25,000.00
85 paku tripleks kg 22,000.00
86 paku persegi kg 22,000.00
87 paku ardex kg 25,000.00
88 paku asbes kg 25,000.00
89 paku tembok 7 - 10 cm kg 25,000.00
90 paku jembatan kg 25,000.00
91 paku sekrup doz 15,000.00
92 baut + mur ID.3/8'' - 7'' s/d 14'' BH 10,000.00
93 kaca polos bening 3 mm Lbr 123,000.00
94 kaca polos bening 5 mm Lbr 205,000.00
95 kaca riben 3 mm Lbr 133,000.00
96 kaca riben 5 mm Lbr 210,000.00
97 kaca naco dengan trali 6 klip set 195,000.00
98 kaca nako dengan trali 7 klip set 220,000.00
99 kaca nako dengan trali 8 klip set 240,000.00
100 kaca nako dengan trali 9 klip set 270,000.00
101 kaca nako dengan trali 10 klip set 290,000.00
102 stang lovers 5 klip pas 75,000.00
103 stang lovers 6 klip pas 115,000.00
104 stang lovers 7 klip pas 105,000.00
105 stang lovers 8 klip pas 120,000.00
106 stang lovers 9 klip pas 135,000.00
107 stang lovers 10 klip pas 150,000.00
108 besi tralis naco bh 22,000.00
109 kaca lover bening Lbr 12,000.00
110 kaca loveer buram Lbr 23,500.00
111 kaca lover rayben Lbr 15,000.00
112 cat tembok (25 kg) ember 425,000.00
113 cat kayu kg 45,000.00
114 cat meni kayu kg 30,000.00
115 cat meni besi kg 35,000.00
116 cat almenium kg 46,000.00
117 cat besi kg 80,000.00
118 cat atap ardex kg 108,000.00
119 plamur besi kg 60,000.00
120 plamur tembok kg 40,000.00
121 plamur kayu kg 30,000.00
122 dempul kayu kg 30,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
123 residu ltr 60,000.00
124 meni besi ltr 28,000.00
125 meni kayu kg 28,000.00
126 minyak cat/tinner kg 28,000.00
127 amplas/kertas pasir Lbr 5,000.00
128 teak wood 1.22 x 2.44 m' Lbr 110,000.00
129 tripleks 3 mm 1.22 x 2.44 m' Lbr 60,000.00
130 multiplex 4 mm 1.22 x 2.44 m' Lbr 75,000.00
131 multiplex 6 mm 1.22 x 2.44 m' Lbr 100,000.00
132 multiplex 9 mm 1.22 x 2.44 m' Lbr 160,000.00
133 multiplex 12 mm 1.22 x 2.44 m' Lbr 200,000.00
134 playwood 1.22 x 2.44 m' Lbr 120,000.00
135 melamin Lbr 120,000.00
136 gypsumboard Lbr 85,000.00
137 kuas biasa 2 '' Lbr 7,000.00
138 kuas biasa 3 '' bh 12,000.00
139 kuas roll bh 25,000.00
140 engsel pintu pas 35,000.00
141 engsel lokal pas 16,000.00
142 engsel H jendela pas 15,000.00
143 engsel H pintu pas 15,000.00
144 engsel kupu2 ring nilon pintu pas 20,000.00
145 engsel kupu2 ring nilon jendela pas 15,000.00
146 hak angin biasa pas 10,000.00
147 hak angin lipat pas 25,000.00
148 kunci gembok globe bh 40,000.00
149 kunci gembok royal bh 50,000.00
150 kunci tanam 1 slag bh 90,000.00
151 kunci terbang 2 slag bh 175,000.00
152 kunci yale 2 slag bh 140,000.00
153 kunci royal besar bh 175,000.00
154 kunci royal kecil bh 90,000.00
155 grandel jendela (kilip) bh 10,000.00
156 grendel lokal bh 10,000.00
157 grendel kecil bh 10,000.00
158 grendel sedang bh 25,000.00
159 grendel besar bh 45,000.00
160 plitur kg 45,000.00
161 pewarna plitur Bks 2,000.00
162 kait angin bh 30,000.00
163 sirlak kg 175,000.00
164 stempet pail 480,000.00
165 teak oil kg 35,000.00
166 pipa PVC 3/4'' btg 30,000.00
167 pipa PVC 2,5'' btg 125,000.00
168 pipa PVC 3'' btg 135,000.00
169 pipa PVC 4'' btg 230,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
170 ID 1/2 '' - 4 m' btg 20,000.00
171 ID 3/4 '' - 4 m' btg 30,000.00
172 ID. 1 '' - 4 m' btg 40,000.00
173 ID. 3 '' - 4 m' btg 120,000.00
174 ID. 4 '' - 4 m' btg 190,000.00
175 ID. 5 '' - 4 m' btg 215,000.00
176 ID. 6 '' - 4 m' btg 450,000.00
177 talang PVC 4-6 '' - 4 m' btg 90,000.00
178 talang PVC 4-8 '' - 4 m' btg 325,000.00
179 pipa GIP kelas medium btg 110,000.00
180 ID. 1/2 '' - 6m' btg 125,000.00
181 ID. 1 '' - 6m' btg 250,000.00
182 ID. 1,5 '' - 6m' btg 350,000.00
183 ID. 2 '' - 6m' btg 370,000.00
184 ID. 3 '' - 6m' btg 600,000.00
185 ID. 4 '' - 6m' btg 800,000.00
186 ID. 5 '' - 6m' btg 1,200,000.00
187 ID. 6 '' - 6m' btg 1,524,900.00
188 pipa besi listrik Ø 3/8'' btg 200,000.00
189 pipa besi listrik Ø 5/8'' btg 400,000.00
190 pipa stainless steel Ø 1'' btg 240,000.00
191 pipa stainless steel Ø 2'' btg 400,000.00
192 seal tip besar roll 10,000.00
193 sikat besi bh 15,000.00
194 aquistic arm strong lbr 105,000.00
195 solar ltr 6,500.00
196 minyak bekisting ltr 3,000.00
197 bensin ltr 6,500.00
198 minyak tanah ltr 4,500.00
199 kayu dolken btg 8,000.00
200 glas block 20 x 20 cm bh 30,000.00
201 ubin keramik polos 20 x 20 doz 65,000.00
202 ubin keramik polos 30 x 30 doz 80,000.00
203 ubin keramik polos 40 x 40 doz 90,000.00
204 ubin porselin 20 x 20 doz 65,000.00
205 ubin porselin 30 x 30 doz 85,000.00
206 ubin porselin 40 x 40 doz 90,000.00
207 ubin pin warna bh 20,000.00
208 ubin plin PC 10 x 20 cm bh 37,000.00
209 ubin plin 10 x 30 cm bh
210 marmer putih 30 x 30 cm bh 165,000.00
211 marmer putih 40 x 60 cm bh 200,000.00
212 marmer hitam 40 x 60 cm bh 300,000.00
213 marmer hitam 60 x 90 cm bh 900,000.00
214 sielent kaca kg 45,000.00
215 step nosing keramik 10/30 bh 16,000.00
216 kosen alminium 12 x 6 x 3 m' 27,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
217 bingkai pintu alminium bh 375,000.00
218 lem vinil kg 60,000.00
219 bak cuci stailes stell 1 lobang bh 450,000.00
220 bak cuci stailes stell 2 lobang bh 600,000.00
221 wastafel ceramik (lengkap) bh 750,000.00
222 kloset duduk porselin/KIA bh 2,000,000.00
223 kloset jongkok porselin putih bh 450,000.00
224 kloset jongkok keramik bh 425,000.00
225 kloset duduk toto bh 2,000,000.00
226 kran air 1/2'' bh 17,500.00
227 kran air 3/4'' bh 35,000.00
228 flafon GRC tiles lbr 180,000.00
229 sower bh 245,000.00
230 reservoir cap.1 m3 fiberglas bh 1,800,000.00
231 pompa dragon bh 500,000.00
232 pompa sanyo kecil bh 475,000.00
233 pompa sanyo besar bh 1,275,000.00
234 pompa air honda 3.5 pk bh 3,500,000.00
235 pagar kawat jaring galv glg 210,000.00
236 panel beton pracetak lbr 65,000.00
237 kolom beton pracetak btg 44,000.00
238 aluminium bondex M² 140,000.00
239 aluminium sirip M² 175,000.00
240 aluminium foil M² 90,000.00
241 water stop 150 mm M² 60,000.00
242 water stop 200 mm M² 72,000.00
243 seal tip besar roll 7,500.00
244 kapur pasang /tohor kg
245 hollowblock (HB. 20) bh 1,500.00
246 bata berongga bh 1,500.00
247 aluminium foil M² 30,000.00
248 tiang galvanis oktagonal 8m 1 mikro btg 3,150,000.00
249 tiang besi galvanis oktagonal 8m 2 mikro btg 4,250,000.00
250 tiang galvanis biasa 8 m 2 mikro btg 2,900,000.00
251 tiang galvanis biasa 8 m 1 mikro btg 3,200,000.00
252 MCB 32 A 1 ph MG bh 95,000.00
253 MCB 6 A 1 ph MG bh 75,000.00
254 MCB 32 A 3 ph MG bh 350,000.00
255 MCB 50 A MG bh 350,000.00
256 time swith legren 30 A bh 550,000.00
257 kontaktor 3 p 80 A LCID50M7 bh 700,000.00
258 kontaktor 1 p 40 A LCID50M8 bh 550,000.00
259 foto cell seleon AS 10A bh 200,000.00
260 foto cell seleon AS 6A bh 175,000.00
261 balon lampu SON T 250 W bh 220,000.00
262 balon lampu SON H 400 W bh 295,000.00
263 travo philips 250 W bh 300,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
264 travo philips 400 W bh 450,000.00
265 lampu TL 20 watt bh 90,000.00
266 lampu TL 2 x 20 watt bh 110,000.00
267 lampu TL 1 x 40 watt bh 100,000.00
268 lampu TL 2 x 40 watt bh 150,000.00
269 lampu pijar 60 watt (S) bh 7,000.00
270 lampu pijar 100 watt bh 9,000.00
271 lampu pijar 25 watt bh 5,000.00
272 lampu pijar 40 watt bh 6,000.00
273 lampu pijar 75 watt bh 8,000.00
274 lampu SL 25 watt bh 61,000.00
275 lampu SL 50 watt bh 135,000.00
276 lampu SL 65 watt bh 150,000.00
277 lampu SL 80 watt bh 180,000.00
278 sekring otomat bh 20,000.00
279 stop kontak bh 25,000.00
280 saklar engkel tanam bh 20,000.00
281 saklar double tanam bh 25,000.00
282 box sekring otomat 1 group bh 22,000.00
283 box sekring otomat 2 group bh 45,000.00
284 box sekring otomat 4 group bh 50,000.00
285 fitting DC bh 55,000.00
286 flaser fire work lamp bh 2,000,000.00
287 kabel tanah NYFGBY 4x6 mm M' 45,000.00
288 kabel SR M' 15,000.00
289 lampu SON H 250 W komplit bh 2,300,000.00
290 lampu SON t 400 W komplit bh 2,500,000.00
291 panel box 30x40x20 CM bh 327,000.00
292 kabel instalasi listrik 2,5mm 100m roll 280,000.00
293 kabel NYY 4x4 mm M' 30,000.00
294 kabel NYM 2x1.5 mm M' 10,000.00
295 kabel NYM 3x1.5 mm M' 15,000.00
296 kabel NYM 2x2.5 mm M' 10,000.00
297 kabel NYM 3x2.5 mm M' 16,000.00
298 kabel NYM 4x3 mm M' 28,000.00
299 isolasi ban roll 15,000.00
300 klem tarik bh 15,000.00
301 konektor bh 10,000.00
302 box meteran set 80,000.00
303 baut ID 14'' s/d 24'' bh 10,000.00
304 trafo distribusi 20 kv,50KVA, out door unit
305 cut out 20 KV ……KA,out dor bh 1,400,000.00
306 fuse link 20 KV ,5A bh 50,000.00
307 aresster 20KV bh 1,200,000.00
308 kawat AAAC 70 mm2 M 20,000.00
309 kabel NYY 1 x 70mm2,TR,untuk OG trafo M 175,000.00
310 travers untuk dudukan CO & LA bh 325,000.00

HARGA SATUAN
NO NAMA BAHAN SATUAN KETERANGAN
( RP )
311 beugels 4'' komplit mur, baut dan ring bh 40,000.00
312 paralell group 25/150 mm2 u/ penyambungan bh 35,000.00
313 kabel schoen AL 70 mm u/ CO & LA M 27,000.00
314 kabel schoen CU 90mm untuk kabel incoming bh 30,000.00
315 pipa kabel 3'' u/ pelindung kabel out going btg 175,000.00
316 elbow (knee) pipa 3'' bh 20,000.00
317 elbow (knee) pipa 4'' bh 53,000.00
318 klem beugels 5''/8''x3'' u/dudukan pipa kabel bh 30,000.00
319 klem beugels D 4'',8''x1'' u/ dudukan pipa pelindung set 57,000.00
320 klem selang , D 3/4'' bh 53,000.00
321 peti pembagi 220/380 volt 100A,4 group unit 9,500,000.00
BACK UP DATA
1 Pembersihan lokasi 32 urugan pasir di
rumus : rumus :
luas lahan
panjang tanah X lebar tanah
20 m X 18 m
= 360.00 m²
33 urugan pasir di
2 pengukuran dan pemasangan bouwplank rumus :
rumus :
2 x ( panjang tanah + lebar tanah )
2 x ( 11 m + 12 m )
= 46.00 m'
34 urugan pasir di
3 Pekerjaan galian tanah pondasi (keras, sedalam = 1m) rumus :
rumus :
tinggi pondasi x (lebar atas + lebar bawah) x Σ Panjang pondasi
2
( 1.5 m + 1 m )
1 m x x 87 m
2 35 urugan pasir di
rumus :
= 108.75 m³

4 Urugan pasir bawah pondasi


rumus :
Tebal urugan x lebar urugan x Σ Panjang pondasi
0.1 m x 1m x 87 m 36 urugan pasir di
= 8.70 m³ rumus :

5 pasangan batu kosong


rumus :
Tebal x lebar x Σ Panjang pondasi
0.25 m x 1m x 87 m 37 urugan pasir di
= 21.75 m³ rumus :

6 pasangan pondasi menerus


rumus :
tinggi pondasi x (lebar atas + lebar bawah) x Σ Panjang pondasi
2 38 urugan pasir di
( 0.25 m + 1 m ) rumus :
0.80 m x x 87 m
2
= 43.50 m³
= 43.50 m³

7 Urugan tanah kembali 39 urugan pasir di


rumus : rumus :
volume galian - volume pondasi
108.75 m³ - 73.95

= 34.80 m³
40 urugan pasir di
8 Pembesian sloof 15/15 cm rumus :
rumus :
Kebutuhan sengkang
panjang sloof = 87 m
selimut beton = 0.025 m
jarak sengkang = 0.15 m 41 urugan pasir di
rumus :
87
jumlah sengkang = = 580 bh
0.15
panjang 1 sengkang = 0.1 x 4 x ( 2 x 0.05 )
= 0.5 m
panjang keseluruhan sengkang = 87 x 0.5 = 43.5 m 42 urugan pasir di
berat besi Ø 6 = 5 kg/m rumus :
berat keseluruhan sengkang = 43.5 x 5 = 217.5 kg

Kebutuhan tulangan pokok


jumlah tulangan = 4 buah
panjang tulangan = 4 x ( 87 + ( 2 x 0.05 )) = 348.4 m 43 urugan pasir di
berat besi Ø 10 = 5 kg/m rumus :
berat keseluruhan sengkang = 348.4 x 5 = 1742 kg

berat total tulangan = 217.5 + 1742 = 1960 kg

9 Kebutuhan bekesting sloof 15/15 cm 44 urugan paasir d


rumus : rumus :
panjang sloof = 87 m
jumlah sisi = 2
luas = 87 x 0.15 = 13.05 m²
= 13.05 x 2 = 26.10 m²
26.10 45 urugan pasir di
direncanakan 2 kali pakai = = 13.05 m²
2 rumus :

10 sloof beton 15/15 cm


rumus :
tinggi = 0.15 m
lebar = 0.15 m 46 cor lantai teras
panjang = 87 m rumus :

volume = 0.15 x 0.15 x 87 = 1.958 m³

11 Pembesian kolom 15/15 cm


rumus : 47 cor lantai ruang
tinggi = 3.10 m rumus :
lebar = 0.15 m
panjang = 0.15 m
selimut beton = 0.025 m
jarak sengkang = 0.15 m
jumlah kolom = 31 48 cor ruang kelua
kebutuhan sengkang perkolom rumus :

jumlah sengkang = 3.10 = 21 bh


0.15
panjang 1 sengkang = 0.1 x 4 x ( 2 x 0.05 )
= 0.5 m
panjang sengkang perkolom = 21 x 0.5 = 10.33 m 49 cor lantai kama
berat besi Ø 6 = 5 kg/m rumus :
berat sengkang perkolom = 10.33 x 5 = 51.67 kg

kebutuhan tulangan pokok perkolom


jumlah tulangan = 4 bh
tulangan pokok perkolom = 3.10 x 4 = 12.4 m 50 cor lantai kama
berat besi Ø 10 = 5 kg/m rumus :
berat tulangan pokok perkolom = 12.4 x 5 = 62 kg

berat sengkang dan tulangan pokok keseluruhan


Total = ( 51.7 + 62 ) x 31 = 3524 kg
51 cor lantai kama
12 Kebutuhan bekesting kolom 15/15 cm rumus :
rumus :
panjang kolom = 96.1 m
jumlah sisi = 4
luas = 96.1 x 0.15 = 14.42 m²
= 14.42 x 4 = 57.66 m² 52 cor lantai kama
direncanakan 2 kali pakai = 57.66 rumus :
= 28.83 m²
2
13 Kolom
rumus :
tinggi = 0.15 m
lebar = 0.15 m 53 cor lantai ruang
panjang = 96.1 m rumus :

volume = 0.15 x 0.15 x 96.1 = 2.162 m³

14 urugan tanah peninggian lantai teras


rumus : 54 cor lantai guda
Luas = 3.35 x 1.85 = 6.198 m² rumus :
tinggi = 0.05
volume = 6.198 x 0.05 = 0.31 m³

15 urugan tanah peninggian lantai ruang tamu


rumus : 55 cor lantai km/w
Luas = 3.35 x 2.85 = 9.548 m² rumus :
tinggi = 0.09
volume = 9.548 x 0.09 = 0.859 m³

16 urugan tanah peninggian ruang keluarga dan ruang makan


rumus : 56 cor lantai km/w
Luas = 5.35 x 3.35 = 17.92 m² rumus :
tinggi = 0.09
volume = 17.92 x 0.09 = 1.613 m³

17 urugan tanah peninggian kamar tidur utama


rumus : 57 cor lantai km/w
Luas = 3.35 x 3.85 = 12.9 m² rumus :
tinggi = 0.09
volume = 12.9 x 0.09 = 1.161 m³

18 urugan tanah peninggian kamar tidur anak 1


rumus : 58 cor lantai temp
Luas = 2.85 x 2.85 = 8.123 m² rumus :
tinggi = 0.09
volume = 8.123 x 0.09 = 0.731 m³

19 urugan tanah peninggian kamar tidur anak 2


rumus : 59 cor lantai temp
Luas = 3.35 x 3.35 = 11.22 m² rumus :
tinggi = 0.09
volume = 11.22 x 0.09 = 1.01 m³

20 urugan tanah peninggian kamar tidur anak 3


rumus :
Luas = 2.35 x 2.35 = 5.523 m²
tinggi = 0.09
volume = 5.523 x 0.09 = 0.497 m³

21 urugan tanah peninggian ruang strika


rumus :
Luas = 2.85 x 1.35 = 3.848 m²
tinggi = 0.09
volume = 3.848 x 0.09 = 0.346 m³

22 urugan tanah peninggian gudang


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.06
volume = 2.498 x 0.06 = 0.15 m³

23 urugan tanah peninggian km/wc 1


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.06
volume = 2.96 x 0.06 = 0.178 m³

24 urugan tanah peninggian km/wc 2


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.06
volume = 2.96 x 0.06 = 0.178 m³

25 urugan tanah peninggian km/wc 3


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.06
volume = 2.498 x 0.06 = 0.15 m³

26 urugan tanah peninggian tempat cuci


rumus :
Luas = 0.85 x 1.85 = 1.573 m²
tinggi = 0.06
volume = 1.573 x 0.06 = 0.094 m³

27 Pembesian ring balok 15/15 cm


rumus :
Kebutuhan sengkang
panjang balok = 87 m
selimut beton = 0.025 m
jarak sengkang = 0.15 m

87
jumlah sengkang = = 580 bh
0.15
panjang 1 sengkang = 0.1 x 4 x ( 2 x 0.05 )
= 0.5 m
panjang keseluruhan sengkang = 87 x 0.5 = 43.5 m
berat besi Ø 6 = 5 kg/m
berat keseluruhan sengkang = 43.5 x 5 = 217.5 kg

Kebutuhan tulangan pokok


jumlah tulangan = 4 buah
panjang tulangan = 4 x ( 87 + ( 2 x 0.05 )) = 348.4 m
berat besi Ø 10 = 5 kg/m
berat keseluruhan sengkang = 348.4 x 5 = 1742 kg

berat total tulangan = 217.5 + 1742 = 1960 kg

28 Kebutuhan bekesting ring balok 15/15 cm


rumus :
panjang sloof = 87 m
jumlah sisi = 2
luas = 87 x 0.15 = 13.05 m²
= 13.05 x 2 = 26.10 m²
26.10
direncanakan 2 kali pakai = = 13.05 m²
2

29 ring balok beton 15/15 cm


rumus :
tinggi = 0.15 m
lebar = 0.15 m
panjang = 87 m

volume = 0.15 x 0.15 x 87 = 1.958 m³

30 pasangan dinding batu bata


rumus :
panjang pasangan dinding batu bata
1.35 + 1.35 + 2.35 + 2.85 + 3.35 + 0.85 = 12.10 m
2.85 + 3.85 + 1.85 + 1.60 + 1.60 + 3.35 = 15.10 m
2.35 + 2.35 + 0.85 + 2.35 + 1.35 + 1.85 = 11.10 m
2.85 + 1.85 + 1.85 + 1.60 + 1.60 + 1.35 = 11.10 m
2.35 + 3.35 + 2.85 + 1.85 + 2.35 + 3.35 = 16.10 m
2.35 + 2.35 + 1.35 + 2.35 + 1.35 + 1.35 = 11.10 m
1.85 + 1.85 = 3.70 m
+
80.30 m
tinggi dinding dari sloof ke ring balok = 3.10 m
luas pasangan dinding = 80.30 x 3.10
= 248.93 m²
pintu jendela 2 ( PJ2 )
PJ2 = 1 bh
luas PJ2 = ( 2.04 x 0.88 ) + ( 1.70 x 1.26 ) = 3.937 m²

pintu jendela 1 ( PJ1 )


PJ1 = 2 bh
luas PJ2 = ( 2.04 x 0.88 ) + ( 1.40 x 0.68 ) = 2.747 m²
total = 2.747 x 2 = 5.494 m²

pintu 1 ( P1 )
pintu 1 = 4 bh
luas PJ2 = 2.04 x 0.88 = 1.795 m²
total = 1.795 x 4 = 7.181 m²

pintu 2 ( P2 )
pintu 2 = 4 bh
luas PJ2 = 2.04 x 0.78 = 1.591 m²
total = 1.591 x 4 = 6.365 m²

jendela 2 ( J2 )
jendela 2 = 3 bh
luas PJ2 = 1.40 x 1.31 = 1.834 m²
total = 1.834 x 3 = 5.502 m²

jendela 1 ( J1 )
jendela 1 = 1 bh
luas PJ2 = 1.40 x 0.68 = 0.952 m²
total = 0.952 x 1 = 0.952 m²

lubang angin
jendela 1 = 14 bh
luas PJ2 = 0.25 x 0.45 = 0.113 m²
total = 0.113 x 14 = 1.575 m²

ventilasi ( V )
jendela 1 = 4 bh
luas PJ2 = 0.50 x 0.40 = 0.2 m²
total = 0.2 x 4 = 0.80 m²

pasangan dinding teras depan


rumus :
1
luas = x 4.64 x 1.85 = 4.292 m²
2

luas netto pasangan dinding dari sloof ke ring balok


248.93 - ( 3.937 + 5.49 + 7.181 + 6.365 + 4.292 +
5.502 + 0.95 + 1.575 + 0.80 ) = 212.83 m²

31 plesteran
rumus :
plesteran dinding
luas plesteran = luas pasangan batu bata = 212.83 m²
jumlah sisi = 2 luar dalam
total luas = 212.83 x 2 = 425.66 m²

plesteran kolom teras 15/15


jumlah kolom = 2 bh
jumlah sisi = 4
luas plesteran = 0.25 x 0.15 = 0.038 m²
= 0.038 x 2 x 4 = 0.30 m²

total luas plesteran = 425.66 + 0.30 = 425.96 m²


BACK UP DATA
urugan pasir dibawah lantai teras
rumus :
Luas = 3.35 x 1.85 = 6.198 m²
tinggi = 0.03
volume = 6.198 x 0.03 = 0.186 m³

urugan pasir dibawah lantai ruang tamu


rumus :
Luas = 3.35 x 2.85 = 9.548 m²
tinggi = 0.03
volume = 9.548 x 0.03 = 0.286 m³

urugan pasir dibawah lantai ruang keluarga dan ruang makan


rumus :
Luas = 5.35 x 3.35 = 17.92 m²
tinggi = 0.03
volume = 17.92 x 0.03 = 0.538 m³

urugan pasir dibawah lantai kamar tidur utama


rumus :
Luas = 3.35 x 3.85 = 12.9 m²
tinggi = 0.03
volume = 12.9 x 0.03 = 0.387 m³

urugan pasir dibawah lantai kamar tidur anak 1


rumus :
Luas = 2.85 x 2.85 = 8.123 m²
tinggi = 0.03
volume = 8.123 x 0.03 = 0.244 m³

urugan pasir dibawah lantai kamar tidur anak 2


rumus :
Luas = 3.35 x 3.35 = 11.22 m²
tinggi = 0.03
volume = 11.22 x 0.03 = 0.337 m³

urugan pasir dibawah lantai kamar tidur anak 3


rumus :
Luas = 2.35 x 2.35 = 5.523 m²
tinggi = 0.03
volume = 5.523 x 0.03 = 0.166 m³

urugan pasir dibawah lantai ruang strika


rumus :
Luas = 2.85 x 1.35 = 3.848 m²
tinggi = 0.03
volume = 3.848 x 0.03 = 0.115 m³

urugan pasir dibawah lantai gudang


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.03
volume = 2.498 x 0.03 = 0.075 m³

urugan pasir dibawah lantai km/wc 1


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.03
volume = 2.96 x 0.03 = 0.089 m³

urugan pasir dibawah lantai km/wc 2


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.03
volume = 2.96 x 0.03 = 0.089 m³

urugan pasir dibawah lantai km/wc 3


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.03
volume = 2.498 x 0.03 = 0.075 m³

urugan paasir dibawah lantai tempat cuci


rumus :
Luas = 0.85 x 1.85 = 1.573 m²
tinggi = 0.03
volume = 1.573 x 0.03 = 0.047 m³

urugan pasir dibawah lantai tempat cuci


rumus :
Luas = 0.85 x 1.85 = 1.573 m²
tinggi = 0.03
volume = 1.573 x 0.03 = 0.047 m³
cor lantai teras
rumus :
Luas = 3.35 x 1.85 = 6.198 m²
tinggi = 0.03
volume = 6.198 x 0.03 = 0.186 m³

cor lantai ruang tamu


rumus :
Luas = 3.35 x 2.85 = 9.548 m²
tinggi = 0.03
volume = 9.548 x 0.03 = 0.286 m³

cor ruang keluarga dan ruang makan


rumus :
Luas = 5.35 x 3.35 = 17.92 m²
tinggi = 0.03
volume = 17.92 x 0.03 = 0.538 m³

cor lantai kamar tidur utama


rumus :
Luas = 3.35 x 3.85 = 12.9 m²
tinggi = 0.03
volume = 12.9 x 0.03 = 0.387 m³

cor lantai kamar tidur anak 1


rumus :
Luas = 2.85 x 2.85 = 8.123 m²
tinggi = 0.03
volume = 8.123 x 0.03 = 0.244 m³

cor lantai kamar tidur anak 2


rumus :
Luas = 3.35 x 3.35 = 11.22 m²
tinggi = 0.03
volume = 11.22 x 0.03 = 0.337 m³

cor lantai kamar tidur anak 3


rumus :
Luas = 2.35 x 2.35 = 5.523 m²
tinggi = 0.03
volume = 5.523 x 0.03 = 0.166 m³
cor lantai ruang strika
rumus :
Luas = 2.85 x 1.35 = 3.848 m²
tinggi = 0.03
volume = 3.848 x 0.03 = 0.115 m³

cor lantai gudang


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.03
volume = 2.498 x 0.03 = 0.075 m³

cor lantai km/wc 1


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.03
volume = 2.96 x 0.03 = 0.089 m³

cor lantai km/wc 2


rumus :
Luas = 1.6 x 1.85 = 2.96 m²
tinggi = 0.03
volume = 2.96 x 0.03 = 0.089 m³

cor lantai km/wc 3


rumus :
Luas = 1.35 x 1.85 = 2.498 m²
tinggi = 0.03
volume = 2.498 x 0.03 = 0.075 m³

cor lantai tempat cuci


rumus :
Luas = 0.85 x 1.85 = 1.573 m²
tinggi = 0.03
volume = 1.573 x 0.03 = 0.047 m³

cor lantai tempat cuci


rumus :
Luas = 0.85 x 1.85 = 1.573 m²
tinggi = 0.03
volume = 1.573 x 0.03 = 0.047 m³
BACK UP DATA BA
3 . PEKERJAAN BETON BERTULA

Pekerjaan sloof 15/15 (K


rumus :
Tebal

0.15
= 1.958
Pekerjaan kolom utama
rumus :
Σ Tiang kolom
30
= 2.093

Pekerjaan ring balk 15/15 (


rumus :
Tebal
0.15
= 1.958

Pekerjaan ring balk 15/15 (

rumus :
Tebal
0.15
= 1.958

Pasangan dinding batu bat


rumus :
Σ Sloof
87

= 265.5
BACK UP DATA

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
1 2 3 4 5
AAN BETON BERTULANG & MAL

rjaan sloof 15/15 (K.150)

x lebalebar x Σ Panjang sloof

m x 0.15 m x 87 m
1.958 m³
rjaan kolom utama 15/15 (K.150)

Σ Tiang kolom x ( ( x lebar B x Tinggi )


x ( 0.15 m x 0.15 m x 3.1 m )
2.093 m³

jaan ring balk 15/15 (K.150)

x lebalebar x Σ Panjang ring balok


m x 0.15 m x 87 m
1.958 m³

jaan ring balk 15/15 (K.150)

x lebalebar x Σ Panjang ring balok


m x 0.15 m x 87 m
1.958 m³

gan dinding batu bata merah (1 Pc : 4 Ps)

X Tinggi pasangan batu bata - (luasan kolom + luasan kusen)


m X 3.1 m - 4.2 m² + 0.0
269.7 - 4.2

265.5 m²
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25
jmlh luas hasil
pintu lebar 80 cm = 4 1.80 7.18 m² p1
pintu lebar 70 cm = 4 1.59 6.36 m² p2
pintu jd 2 = 1 3.94 3.94 m² pj2
pintu jd 1 = 2 2.75 5.49 m² pj1
lubang angin = 14 0.11 1.58 m²
jendela 1 = 1 0.95 0.95 m² j1
jendela 2 = 3 1.83 5.50 m² j2
ventilasi = 4 0.20 0.80 m² v
jumlah = 31.81 m²

jmlh luas hasil


pintu lebar 80 cm = 4 1.80 7.18 m² p1 s
pintu lebar 70 cm = 4 1.59 6.36 m² p2 s
pintu jd 2 = 1 3.94 3.94 m² pj2 s
pintu jd 1 = 2 2.75 5.49 m² pj1 s
lubang angin = 14 0.11 1.58 m²
jendela 1 = 1 0.95 0.95 m² j1 s
jendela 2 = 3 1.83 5.50 m² j2 s
ventilasi = 4 0.20 0.80 m² v
jumlah = 31.81 m²
BACK UP DATA

NO GAMBAR TANPA SKALA PERHITUNGAN LUAS DAN VOLUME


REKAPITULASI PEKERJAAN KONSTRUKSI
JUMLAH
NO URAIAN PEKERJAAN
( RP )
ANALISA HARGA SATUAN PEKERJAAN
HARGA TOTAL
NO URAIAN PEKERJAAN SATUAN INDEKS SATUAN HARGA
( RP ) ( RP )
RENCANA ANGGARAN BIAYA
HARGA TOTAL
NO URAIAN PEKERJAAN SATUAN VOLUME SATUAN HARGA