PROGRAM : KONSERVASI KEANEKARAGAMAN HAYATI DAN PERLINDUNGAN HUTAN

PEKERJAAN : REHABILITASI PONDOK KERJA KAPURAN II ( 70 M2 )


: REHABILITASI PONDOK KERJA KAPURAN III ( 70 M2 )
LOKASI : KAPURAN, KARIMUNJAWA
TAHUN ANGGARAN : 2013

DAFTAR HARGA UPAH DAN SATUAN BAHAN

A. HARGA UPAH TENAGA

NO URAIAN SAT HARGA

1 Pekerja Oh Rp 46,000.00
2 Mandor Oh Rp 58,000.00
3 Kepala Tukang Oh Rp 67,000.00
4 Tukang Batu Oh Rp 58,000.00
5 Tukang Besi Oh Rp 58,000.00
6 Tukang Kayu Oh Rp 58,000.00
7 Tukang Cat Oh Rp 58,000.00

B. HARGA BAHAN / MATERIAL

NO URAIAN SAT HARGA

1 Semen PC 40 kg Zak Rp 61,000.00


2 Semen Warna Kg Rp 11,000.00
3 Pasir Beton M3 Rp 258,000.00
4 Pasir Urug M3 Rp 78,000.00
5 Bata Merah Bh Rp 600.00
6 Batu Belah M3 Rp 135,000.00
7 Batu Pecah/split M3 Rp 200,000.00
8 Tanah Urug M3 Rp 60,000.00
9 Besi Beton Kg Rp 11,000.00
10 Kawat Beton Kg Rp 15,000.00
11 Paku Kg Rp 15,000.00
12 Cat Kayu Kg Rp 55,000.00
13 Cat Tembok Kg Rp 21,000.00
14 Cat Meni Kg Rp 11,000.00
15 Amplas Lbr Rp 3,000.00
16 Dempul Kayu Kg Rp 11,000.00
17 Plamur Tembok Kg Rp 12,000.00
18 Minyak Cat Ltr Rp 15,000.00
19 Gypsum 9 mm Lbr Rp 60,000.00
20 Kalsiboard 4 mm Lbr Rp 50,000.00
21 List Gypsum M' Rp 7,500.00
22 Kayu Bengkirai M3 Rp 9,550,000.00
23 Kayu Cetakan / bekisting M3 Rp 850,000.00
24 Kaca bening 5 mm M2 Rp 80,000.00
25 Keramik dinding 20/25 M2 Rp 40,000.00
26 Keramik lantai 20/20 M2 Rp 36,000.00
27 Keramik dinding 20/20 M2 Rp 40,000.00
28 Keramik lantai 40/40 M2 Rp 50,000.00
29 Keramik lantai 30/30 M2 Rp 40,000.00
30 Genteng kodok Bh Rp 2,000.00
31 Bubungan genteng Bh Rp 4,000.00
32 Buis Beton U 20 Bh Rp 38,000.00
33 Buis Beton O 20 Bh Rp 40,000.00
34 Paving blok holland t = 5 cm Bh Rp 1,000.00
ANALISA HARGA SATUAN PEKERJAAN

HARGA UPAH HARGA


NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
A. PEKERJAAN TANAH
1 SNI 1 M3 Galian tanah biasa sedalam 1 m
2835-2008 0.7500 oh Pekerja 46,000.00 34,500.00
0.0250 oh Mandor 58,000.00 1,450.00
35,950.00
2 SNI 1 M3 Galian tanah biasa sedalam 2 m
2835-2008 0.9000 oh Pekerja 46,000.00 41,400.00
0.0450 oh Mandor 58,000.00 2,610.00
44,010.00
3 SNI 1 M3 Mengurug tanah kembali ( 1/3 dari indek pek galian )
2835-2008 0.3000 oh Pekerja 46,000.00 13,800.00
0.0150 oh Mandor 58,000.00 870.00
14,670.00
4 SNI 1 M3 Urugan pasir
2835-2008 1.2000 oh Pasir urug 78,000.00 93,600.00
0.0100 oh Mandor 58,000.00 580.00
0.3000 oh Pekerja 46,000.00 13,800.00
14,380.00 93,600.00 107,980.00
B. PEKERJAAN PONDASI
1 SNI 1 M3 Pasang batu belah 1 Pc : 8 Ps
2836-2008 1.2000 m3 Batu belah 135,000.00 162,000.00
91.0000 kg Portland Cemen ( PC ) 1,525.00 138,775.00
0.5840 m3 Pasir beton 258,000.00 150,672.00
1.5000 oh Pekerja 46,000.00 69,000.00
0.7500 oh Tukang batu 58,000.00 43,500.00
0.0750 oh Kepala tukang 67,000.00 5,025.00
0.0750 oh Mandor 58,000.00 4,350.00
121,875.00 451,447.00 573,322.00
C. PEKERJAAN DINDING & PLESTERAN
1 SNI 1 M2 Pasang batu bata merah (5x11x22) cm tbl 1/2 bata camp 1 Pc : 8 Ps
6897-2008 70.0000 bh Batu bata 600.00 42,000.00
6.5000 kg Portland Cemen ( PC ) 1,525.00 9,912.50
0.0500 m3 Pasir beton 258,000.00 12,900.00
0.3000 oh Pekerja 46,000.00 13,800.00
0.1000 oh Tukang batu 58,000.00 5,800.00
0.0100 oh Kepala tukang 67,000.00 670.00
0.0150 oh Mandor 58,000.00 870.00
21,140.00 64,812.50 85,952.50
2 SNI 1 M2 Plesteran 1 Pc : 8 Ps- tbl 15 mm
6897-2008 3.4560 kg Portland Cemen ( PC ) 1,525.00 5,270.40
0.0290 m3 Pasir beton 258,000.00 7,482.00
0.3000 oh Pekerja 46,000.00 13,800.00
0.1500 oh Tukang batu 58,000.00 5,800.00
0.0150 oh Kepala tukang 67,000.00 670.00
0.0150 oh Mandor 58,000.00 870.00
21,140.00 12,752.40 33,892.40
3 SNI 1 M2 Plesteran 1 Pc : 5 Ps- tbl 15 mm
2837-2008 5.1840 kg Portland Cemen ( PC ) 1,525.00 7,905.60
0.0260 m3 Pasir beton 258,000.00 6,708.00
0.3000 oh Pekerja 46,000.00 13,800.00
0.1500 oh Tukang batu 58,000.00 8,700.00
0.0150 oh Kepala tukang 67,000.00 1,005.00
0.0150 oh Mandor 58,000.00 870.00
24,375.00 14,613.60 38,988.60
4 SNI 1 M' Plesteran skoning 1 : 2 lebar 10 mm
2837-2008 0.5000 kg Portland Cemen ( PC ) 1,525.00 762.50
0.0130 m3 Pasir beton 258,000.00 3,354.00
0.0800 oh Pekerja 46,000.00 3,680.00
0.0400 oh Tukang batu 58,000.00 2,320.00
0.0400 oh Kepala tukang 67,000.00 2,680.00
0.0040 oh Mandor 58,000.00 232.00
8,912.00 4,116.50 13,028.50
5 SNI 1 M2 Memasang acian
2837-2008 3.2500 kg Portland Cemen ( PC ) 1,525.00 4,956.25
0.2000 oh Pekerja 46,000.00 9,200.00
0.1000 oh Tukang batu 58,000.00 5,800.00
0.0100 oh Kepala tukang 67,000.00 670.00
0.0100 oh Mandor 58,000.00 580.00
16,250.00 4,956.25 21,206.25
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
6 1 M2 Pasang dinding batu alam (paras) :
1.1000 m2 Batu alam paras 97,600.00 107,360.00
11.7500 kg Portland Cemen ( PC ) 1,525.00 17,918.75
0.0350 m3 Pasir pasang 258,000.00 9,030.00
0.6200 oh Pekerja 46,000.00 28,520.00
0.3500 oh Tukang 58,000.00 20,300.00
0.0350 oh Kepala tukang 67,000.00 2,345.00
0.0300 oh Mandor 58,000.00 1,740.00
52,905.00 134,308.75 187,213.75
D. PEKERJAAN LANTAI
1 1 M2 Lantai keramik 40/40 :
6.6300 bh keramik 40x40 7,541.48 50,000.00
9.8000 kg Portland Cemen ( PC ) 1,525.00 14,945.00
1.3000 kg PC warna 11,000.00 14,300.00
0.0450 m3 Pasir beton 258,000.00 11,610.00
0.2500 oh Pekerja 46,000.00 11,500.00
0.1200 oh Tukang batu 58,000.00 6,960.00
0.0120 oh Kepala tukang 67,000.00 804.00
0.0130 oh Mandor 58,000.00 754.00
20,018.00 90,855.00 110,873.00
2 1 M2 Lantai keramik 30/30 :
11.8700 bh Keramik 30x30 3,369.84 40,000.00
10.0000 kg Portland Cemen ( PC ) 1,525.00 15,250.00
1.5000 kg PC warna 11,000.00 16,500.00
0.0450 m3 Pasir beton 258,000.00 11,610.00
0.6200 oh Pekerja 46,000.00 28,520.00
0.3500 oh Tukang batu 58,000.00 20,300.00
0.0350 oh Kepala tukang 67,000.00 2,345.00
0.0300 oh Mandor 58,000.00 1,740.00
52,905.00 83,360.00 136,265.00
3 SNI 1 M2 Pasang keramik dinding 20x25 :
7395-2008 21.5000 bh Keramik 20x25 1,860.47 40,000.00
10.4000 kg Portland Cemen ( PC ) 1,525.00 15,860.00
1.6200 kg PC warna 11,000.00 17,820.00
0.0450 m3 Pasir beton 258,000.00 11,610.00
0.6200 oh Pekerja 46,000.00 28,520.00
0.3500 oh Tukang 58,000.00 20,300.00
0.0350 oh Kepala tukang 67,000.00 2,345.00
0.0300 oh Mandor 58,000.00 1,740.00
52,905.00 85,290.00 138,195.00
4 SNI 1 M2 Pasang keramik lantai 20x20 :
7395-2008 26.5000 bh Keramik 20x20 1,358.49 36,000.00
10.4000 kg Portland Cemen ( PC ) 1,525.00 15,860.00
1.6200 kg PC warna 11,000.00 17,820.00
0.0450 m3 Pasir beton 258,000.00 11,610.00
0.6200 oh Pekerja 46,000.00 28,520.00
0.3500 oh Tukang 58,000.00 20,300.00
0.0350 oh Kepala tukang 67,000.00 2,345.00
0.0300 oh Mandor 58,000.00 1,740.00
52,905.00 81,290.00 134,195.00
5 SNI 1 M2 Pasang keramik meja / dinding 20x20 :
7395-2008 26.5000 bh Keramik 20x20 1,509.43 40,000.00
10.4000 kg Portland Cemen ( PC ) 1,525.00 15,860.00
1.6200 kg PC warna 11,000.00 17,820.00
0.0450 m3 Pasir beton 258,000.00 11,610.00
0.6200 oh Pekerja 46,000.00 28,520.00
0.3500 oh Tukang 58,000.00 20,300.00
0.0350 oh Kepala tukang 67,000.00 2,345.00
0.0300 oh Mandor 58,000.00 1,740.00
52,905.00 85,290.00 138,195.00
6 SNI 1 M' Pasang keramik border dinidng km/wc 7x20 :
4.0000 bh Keramik border 7x20 5,490.00 21,960.00
1.1400 kg Portland Cemen ( PC ) 1,525.00 1,738.50
0.0250 kg PC warna 11,000.00 275.00
0.0030 m3 Pasir beton 258,000.00 774.00
0.0900 oh Pekerja 46,000.00 4,140.00
0.0900 oh Tukang 58,000.00 5,220.00
0.0090 oh Kepala tukang 67,000.00 603.00
0.0050 oh Mandor 58,000.00 290.00
10,253.00 24,747.50 35,000.50
E. PEKERJAAN BETON
1 SNI 10 kg Pembesian dengan besi polos / ulir
7394-2008 10.5000 kg Besi polos / ulir 11,000.00 115,500
0.1500 kg Kawat beton 15,000.00 2,250
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
0.0700 oh Tukang besi 58,000.00 4,060.00
0.0070 oh Kepala tukang 67,000.00 469.00
0.0700 oh Pekerja 46,000.00 3,220.00
0.0040 oh Mandor 58,000.00 232.00
7,981.00 117,750.00 125,731.00
1 kg Pembesian dengan besi polos / ulir Jml Total 12,573.10
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
2 SNI 1 M2 Memasang Bekisting untuk sloof
7394-2008 0.0450 m3 Kayu kelas III (terentang) 850,000.00 38,250
0.3000 kg Paku biasa 2"-5" 15,000.00 4,500
0.1000 ltr Minyak bekisting 14,640.00 1,464
0.2600 oh Tukang kayu 58,000.00 15,080.00
0.0260 oh Kepala tukang 67,000.00 1,742.00
0.5200 oh Pekerja 46,000.00 23,920.00
0.0260 oh Mandor 58,000.00 1,508.00
42,250.00 44,214.00 86,464.00
3 SNI 1 M2 Memasang Bekisting untuk kolom
7394-2008 0.0400 m3 Kayu kelas III (terentang) 850,000.00 34,000
0.4000 kg Paku biasa 2"-5" 15,000.00 6,000
0.2000 ltr Minyak bekisting 14,640.00 2,928
0.0150 m3 Balok kayu kelas III 850,000.00 12,750
0.3500 lbr Plywood tebal 9 mm 122,000.00 42,700
2.0000 btg Dolken kayu dia 8-10 cm / 4 m 12,000.00 24,000
0.6600 oh Pekerja 46,000.00 30,360.00
0.3300 oh Tukang kayu 58,000.00 19,140.00
0.0330 oh Kepala tukang 67,000.00 2,211.00
0.0330 oh Mandor 58,000.00 1,914.00
53,625.00 122,378.00 176,003.00
4 SNI 1 M2 Memasang Bekisting untuk balok
7394-2008 0.0400 m3 Kayu kelas III (terentang) 850,000.00 34,000
0.4000 kg Paku biasa 2"-5" 15,000.00 6,000
0.2000 ltr Minyak bekisting 14,640.00 2,928
0.0180 m3 Balok kayu kelas III 850,000.00 15,300
0.3500 lbr Plywood tebal 9 mm 122,000.00 42,700
2.0000 btg Dolken kayu dia 8-10 cm / 4 m 12,000.00 24,000
0.6600 oh Pekerja 46,000.00 30,360.00
0.3300 oh Tukang kayu 58,000.00 19,140.00
0.0330 oh Kepala tukang 67,000.00 2,211.00
0.0330 oh Mandor 58,000.00 1,914.00
53,625.00 124,928.00 178,553.00
5 SNI 1 M2 Memasang Bekisting untuk lantai
7394-2008 0.0400 m3 Kayu kelas III (terentang) 850,000.00 34,000
0.4000 kg Paku biasa 2"-5" 15,000.00 6,000
0.2000 ltr Minyak bekisting 14,640.00 2,928
0.0150 m3 Balok kayu kelas III 850,000.00 12,750
0.3500 lbr Plywood tebal 9 mm 122,000.00 42,700
6.0000 btg Dolken kayu dia 8-10 cm / 4 m 12,000.00 72,000
0.6600 oh Pekerja 46,000.00 30,360.00
0.3300 oh Tukang kayu 58,000.00 19,140.00
0.0330 oh Kepala tukang 67,000.00 2,211.00
0.0330 oh Mandor 58,000.00 1,914.00
53,625.00 170,378.00 224,003.00
6 SNI 1 M3 Membuat lantai kerja Beton mutu fc = 7,4 Mpa ( K 100 ) slum (3-6) cm, w/c = 0,87
7394-2008 230.0000 kg Portland Semen 1,525.00 350,750
893.0000 kg Pasir beton 184.29 164,567
1,027.0000 kg Kerikil (maksimum 30 mm) 148.15 152,148
200.0000 ltr Air 150.00 30,000
1.2000 oh Pekerja 46,000.00 55,200.00
0.2000 oh Tukang batu 58,000.00 11,600.00
0.0200 oh Kepala tukang 67,000.00 1,340.00
0.0060 oh Mandor 58,000.00 348.00
68,488.00 697,465.29 765,953.29
7 1 M3 Membuat Beton mutu fc = 7,4 Mpa ( K 100 ) slum (12±2) cm, w/c = 0,87
247.0000 kg Portland Cemen ( PC ) 1,525.00 376,675.00
869.0000 kg Pasir beton 184.29 160,144.29
999.0000 kg Kerikil (maksimum 30 mm) 148.15 148,000.00
215.0000 ltr air 150.00 32,250.00
1.6500 oh Pekerja 46,000.00 75,900.00
0.2750 oh Tukang batu 58,000.00 15,950.00
0.0280 oh Kepala tukang 67,000.00 1,876.00
0.0830 oh Mandor 58,000.00 4,814.00
98,540.00 717,069.29 815,609.29
8 Dihitung 1 M3 Beton bertulang praktis 15 x 15 :
1.0000 m3 Beton 815,609.29 815,609.29
133.6876 kg Pembesian 12,573.10 1,680,866.96
13.3200 m2 Bekisting 176,003.00 2,344,359.96
4,840,836.21
9 Dihitung 1 M3 Beton bertulang sloof 15 x 20 :
1.0000 m3 Beton 815,609.29 815,609.29
106.4989 kg Pembesian 12,573.10 1,339,021.76
13.3332 m2 Bekisting 86,464.00 1,152,841.80
3,307,472.85
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
10 Dihitung 1 M3 Beton bertulang ring balok 15 x 20 RB :
1.0000 m3 Beton 815,609.29 815,609.29
106.4989 kg Pembesian 12,573.10 1,339,021.76
13.3332 m2 Bekisting 178,553.00 2,380,682.86
4,535,313.90
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
11 Dihitung 1 Bh Pondasi foot plat 100 x 100 ( Tower ) :
0.0500 m3 Lantai kerja mutu K-100 765,953.29 38,297.66
0.2500 m3 Beton 815,609.29 203,902.32
16.3100 kg Pembesian 12,573.10 205,067.26
0.8000 m2 Bekisting 86,464.00 69,171.20
516,438.45
12 Dihitung 1 M3 Beton bertulang sloof 15 x 20 ( Ground + Tower ) :
1.0000 m3 Beton 815,609.29 815,609.29
160.8401 kg Pembesian 12,573.10 2,022,258.14
13.3332 m2 Bekisting 86,464.00 1,152,841.80
3,990,709.23
13 Dihitung 1 M3 Beton bertulang kolom 20 x 20 ( Tower ) :
1.0000 m3 Beton 815,609.29 815,609.29
125.5438 kg Pembesian 12,573.10 1,578,474.12
20.0000 m2 Bekisting 176,003.00 3,520,060.00
5,914,143.41
14 Dihitung 1 M3 Beton bertulang balok 15 x 25 ( Tower ) :
1.0000 m3 Beton 815,609.29 815,609.29
133.9150 kg Pembesian 12,573.10 1,683,726.78
17.3336 m2 Bekisting 178,553.00 3,094,957.35
5,594,293.42
15 Dihitung 1 M3 Beton bertulang plat T = 10 cm ( Tower ) :
1.0000 m3 Beton 815,609.29 815,609.29
62.0000 kg Pembesian 12,573.10 779,532.20
10.0000 m2 Bekisting 224,003.00 2,240,030.00
3,835,171.49
16 Dihitung 1 M3 Beton bertulang balok 15 x 20 ( Ground tank ) :
1.0000 m3 Beton 815,609.29 815,609.29
169.3550 kg Pembesian 12,573.10 2,129,317.01
13.3332 m2 Bekisting 178,553.00 2,380,682.86
5,325,609.16
17 Dihitung 1 M3 Beton bertulang plat topi-topi T = 8 cm
1.0000 m3 Beton 815,609.29 815,609.29
77.5000 kg Pembesian 12,573.10 974,415.25
12.5000 m2 Bekisting 224,003.00 2,800,037.50
4,590,062.04
F. PEKERJAAN ATAP
1 SNI 1 M2 Pasang atap genteng kodok ( baru )
3436-2002 25.0000 bh Genteng kodok 2,000.00 50,000.00
0.1500 oh Pekerja 46,000.00 6,900.00
0.0750 oh Tukang kayu 58,000.00 4,350.00
0.0080 oh Kepala tukang 67,000.00 536.00
0.0080 oh Mandor 58,000.00 464.00
12,250.00 50,000.00 62,250.00
2 SNI 1 M' Pasang bubungan genteng
3436-2002 5.0000 bh Bubungan genteng 4,000.00 20,000.00
8.0000 kg Portland Cemen ( PC ) 1,525.00 12,200.00
0.0320 m3 Pasir beton 258,000.00 8,256.00
0.4000 oh Pekerja 46,000.00 18,400.00
0.2000 oh Tukang kayu 58,000.00 11,600.00
0.0200 oh Kepala tukang 67,000.00 1,340.00
0.0020 oh Mandor 58,000.00 116.00
31,456.00 40,456.00 71,912.00
3 SNI 1 M2 Pasang atap genteng kodok ( lama pasang kembali )
3436-2002 0.1500 oh Pekerja 46,000.00 6,900.00
0.0750 oh Tukang kayu 58,000.00 4,350.00
0.0080 oh Kepala tukang 67,000.00 536.00
0.0080 oh Mandor 58,000.00 464.00
12,250.00 12,250.00
4 SNI 1 M2 Pasang atap fiber glass sunroof
7393-2008 0.3500 lbr Fiber glass sunroof 72,590.00 25,406.50
0.1200 kg Paku pancing 15,000.00 1,800.00
0.1400 oh Pekerja 46,000.00 6,440.00
0.0700 oh Tukang kayu 58,000.00 4,060.00
0.0070 oh Kepala tukang 67,000.00 469.00
0.0070 oh Mandor 58,000.00 406.00
11,375.00 27,206.50 38,581.50
G. PEKERJAAN BESI
1 1 Kg Memasang Besi Profil :
1.1500 kg Besi profil siku 8,500.00 9,775.00
0.0600 kg Meni besi 18,300.00 1,098.00
0.0600 oh Pekerja 46,000.00 2,760.00
0.0600 oh Tukang besi 58,000.00 3,480.00
0.0060 oh Kepala tukang 67,000.00 402.00
0.0030 oh Mandor 58,000.00 174.00
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
6,816.00 10,873.00 17,689.00
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
2 1 M' Pasang Tiang pipa 2" :
1.2000 m' Pipa 2" 47,783.33 57,340.00
3.0000 ttk Pengelasan 3,660.00 10,980.00
0.0540 oh Pekerja 46,000.00 2,484.00
0.0900 oh Tukang Besi 58,000.00 5,220.00
0.0090 oh Kepala tukang 67,000.00 603.00
0.0270 oh Mandor 58,000.00 1,566.00
7,389.00 70,804.00 78,193.00
3 1 M' Pasang gording pipa 1" :
1.2000 m' Pipa 1" 27,450.00 32,940.00
4.0000 ls Pengelasan 3,660.00 14,640.00
0.0540 oh Pekerja 46,000.00 2,484.00
0.0900 oh Tukang Besi 58,000.00 5,220.00
0.0090 oh Kepala tukang 67,000.00 603.00
0.0270 oh Mandor 58,000.00 1,566.00
7,389.00 50,064.00 57,453.00
4 1 M' Pasang grill penutup saluran + cat
3.5360 kg besi siku 30.30.3 17,689.00 62,548.30
2.4800 kg besi dia 10 mm 17,689.00 43,868.72
1.0000 ls ttk las 50,000.00 50,000.00
1.5680 m2 Cat besi 31,789.00 49,845.15
206,262.18
5 1 Bh Pasang grill penutup bak kontrol + cat
1.6320 kg besi siku 30.30.3 17,689.00 28,868.45
0.7440 kg besi dia 10 mm 17,689.00 13,160.62
1.0000 ls las listrik 25,000.00 25,000.00
0.4266 m2 Cat besi 31,789.00 13,561.19
80,590.25
H. PEKERJAAN PLAFOND
1 SNI 1 M2 Plafond gypsum board (120x240) tebal 9 mm:
2839-2008 0.3640 lbr Gypsum Board 9 mm 60,000.00 21,840.00
1.0250 btg Rangka hollow 2x4 cm 15,000.00 15,375.00
3.0000 bh Stifenner 2,500.00 7,500.00
0.1100 kg Paku keling/sekrup 3,000.00 330.00
4.0000 bh Penggantung dan Ramzet 4,000.00 16,000.00
0.1000 oh Pekerja 46,000.00 4,600.00
0.0500 oh Tukang kayu 58,000.00 2,900.00
0.0050 oh Kepala tukang 67,000.00 335.00
0.0050 oh Mandor 58,000.00 290.00
8,125.00 61,045.00 69,170.00
2 SNI 1 M2 Plafond kalsiboard (120x240) tebal 4 mm:
2839-2008 0.3640 lbr Kalsiboar 4 mm 50,000.00 18,200.00
1.0250 btg Rangka hollow 2x4 cm 15,000.00 15,375.00
3.0000 bh Stifenner 2,500.00 7,500.00
0.1100 kg Paku keling/sekrup 3,000.00 330.00
4.0000 bh Penggantung dan Ramzet 4,000.00 16,000.00
0.1000 oh Pekerja 46,000.00 4,600.00
0.0500 oh Tukang kayu 58,000.00 2,900.00
0.0050 oh Kepala tukang 67,000.00 335.00
0.0050 oh Mandor 58,000.00 290.00
8,125.00 57,405.00 65,530.00
3 SNI 1M' Pasang list plafond gypsum
2839-2008 1.0000 m' List Profil Gypsum 7,500.00 7,500.00
0.6500 kg Compon 2,500.00 1,625.00
1.0000 m2 Upah 2,000.00 2,000.00
2,000.00 9,125.00 11,125.00
4 1 M2 Plesteran kompon
0.0784 zak Semen putih 45,000.00 3,527.12
0.1500 lbr Amplas 3,000.00 450.00
0.1600 oh Pekerja 46,000.00 7,358.16
0.0800 oh Tukang batu 58,000.00 4,638.84
0.0080 oh Kepala tukang 67,000.00 535.87
0.0080 oh Mandor 58,000.00 463.88
12,996.75 3,977.12 16,973.87
I. PEKERJAAN KUSEN KAYU DAN ALUMINIUM
1 1 Unit Kusen aluminium Type PJ1
11.5000 m' Rangka kusen 66,000.00 759,000.00
8.1200 m' Frame daun jendela 71,500.00 580,580.00
8.1000 m' Silikon gel 2,500.00 20,250.00
7.6400 m' Tube sealant 3,000.00 22,920.00
12.0000 bh Sekrup fixer 500.00 6,000.00
1.0000 bh Slot pintu 90,000.00 90,000.00
6.0000 bh Engsel pintu 10,000.00 60,000.00
2.0000 bh Espanolete pintu 35,000.00 70,000.00
1,608,750.00 1,608,750.00
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
2 1 Unit Kusen aluminium Type PJ2
10.2000 m' Rangka kusen 66,000.00 673,200.00
6.7200 m' Frame daun jendela bv 71,500.00 480,480.00
7.4000 m' Silikon gel 2,450.00 18,130.00
6.2400 m' Tube sealant 3,000.00 18,720.00
11.0000 bh Sekrup fixer 500.00 5,500.00
1.0000 bh Slot pintu 90,000.00 90,000.00
3.0000 bh Engsel pintu 10,000.00 30,000.00
1,316,030.00 1,316,030.00
3 1 Unit Kusen aluminium Type P1
5.2000 m' Rangka kusen 66,000.00 343,200.00
5.2000 m' Silikon gel 2,450.00 12,740.00
8.0000 bh Sekrup fixer 500.00 4,000.00
1.0000 bh Slot pintu 90,000.00 90,000.00
3.0000 bh Engsel pintu 10,000.00 30,000.00
479,940.00 479,940.00
4 1 Unit Kusen aluminium Type J1
4.0000 m' Rangka kusen 66,000.00 264,000.00
3.3600 m' Frame daun jendela 71,500.00 240,240.00
4.0000 m' Silikon gel 2,450.00 9,800.00
4.0800 m' Tube sealant 3,000.00 12,240.00
10.0000 bh Sekrup fixer 500.00 5,000.00
2.0000 bh Engsel jendela 9,000.00 18,000.00
2.0000 bh Kait angin jendela 8,000.00 16,000.00
1.0000 bh Grendel jendela 8,000.00 8,000.00
573,280.00 573,280.00
5 1 Unit Kusen aluminium Type BV
2.6000 m' Rangka kusen 66,000.00 171,600.00
2.6000 m' Silikon gel 2,450.00 6,370.00
2.4400 m' Tube sealant 3,000.00 7,320.00
4.0000 bh Sekrup fixer 500.00 2,000.00
187,290.00 187,290.00
6 1 M3 Membuat kusen pintu/jendela kayu kelas II dan III bengkirai
1.2000 m3 Kayu bengkirai 9,550,000.00 11,460,000.00
1.2500 kg Paku 15,000.00 18,750.00
1.0000 kg Lem kayu 12,000.00 12,000.00
6.0000 oh Pekerja 46,000.00 276,000.00
20.0000 oh Tukang kayu 58,000.00 1,160,000.00
2.0000 oh Kepala tukang 67,000.00 134,000.00
0.3000 oh Mandor 58,000.00 17,400.00
1,587,400.00 11,490,750.00 13,078,150.00
7 1 M2 Daun pintu panil kayu bengkirai
0.0400 m3 Kayu bengkirai 9,550,000.00 382,000.00
0.0500 kg Lem kayu 12,000.00 600.00
1.0000 oh Pekerja 46,000.00 46,000.00
2.5000 oh Tukang kayu 58,000.00 145,000.00
0.2500 oh Kepala tukang 67,000.00 16,750.00
0.0500 oh Mandor 58,000.00 2,900.00
210,650.00 382,600.00 593,250.00
8 1 M2 Membuat Pintu & Jendela kaca rangka kayu bengkirai :
0.0240 m3 Kayu bengkirai 9,550,000.00 229,200.00
0.3000 kg Lem kayu 12,000.00 3,600.00
0.8000 oh Pekerja 46,000.00 36,800.00
2.0000 oh Tukang kayu 58,000.00 116,000.00
0.2000 oh Kepala tukang 67,000.00 13,400.00
0.0400 oh Mandor 58,000.00 2,320.00
168,520.00 232,800.00 401,320.00
J. PEKERJAAN CAT
1 SNI 1 M2 Pengecatan Bidang Kayu ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
03-24 0.2000 kg Cat Meni 11,000.00 2,200.00
0.1500 kg Plamir kayu 11,000.00 1,650.00
0.1700 kg Cat Dasar 55,000.00 9,350.00
0.2600 kg Cat Penutup 2 x 55,000.00 14,300.00
0.0700 oh Pekerja 46,000.00 3,220.00
0.0090 oh Tukang Cat 58,000.00 522.00
0.0060 oh Kepala tukang Cat 67,000.00 402.00
0.0025 oh Mandor 58,000.00 145.00
4,289.00 27,500.00 31,789.00
2 SNI 1 M2 Pengecatan Tembok Baru ( 1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup )
03-24 0.1000 kg Plamir tembok 12,000.00 1,200.00
0.1000 kg Cat Dasar 21,000.00 2,100.00
0.2600 kg Cat Penutup 2 x 21,000.00 5,460.00
0.0200 oh Pekerja 46,000.00 920.00
0.0630 oh Tukang Cat 58,000.00 3,654.00
0.0063 oh Kepala tukang Cat 67,000.00 422.10
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
0.0025 oh Mandor 58,000.00 145.00
5,141.10 8,760.00 13,901.10
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
3 1 M2 Pengecatan genteng :
0.1000 kg Cat Dasar 63,000.00 6,300.00
0.2600 kg Cat Penutup 2 x 63,000.00 16,380.00
0.0200 oh Pekerja 46,000.00 920.00
0.0630 oh Tukang Cat 58,000.00 3,654.00
0.0063 oh Kepala tukang Cat 67,000.00 422.10
0.0025 oh Mandor 58,000.00 145.00
5,141.10 22,680.00 27,821.10
K. PEKERJAAN PLAMBING & SALURAN
1 SNI 1 M' Pasang pipa PVC 1" :
1.2000 m' Pipa PVC 7,500.00 9,000.00
0.3500 ls Perlengkapan 35 % harga pipa 7,500.00 2,625.00
0.0360 oh Pekerja 46,000.00 1,656.00
0.0600 oh Tukang ledeng 58,000.00 3,480.00
0.0060 oh Kepala tukang 67,000.00 402.00
0.0018 oh Mandor 58,000.00 104.40
3,986.40 13,281.00 17,267.40
2 1 M' Pasang pipa PVC 3/4" :
1.2000 m' Pipa PVC 7,500.00 9,000.00
0.3500 ls Perlengkapan 35 % harga pipa 7,500.00 2,625.00
0.0360 oh Pekerja 46,000.00 1,656.00
0.0600 oh Tukang 58,000.00 3,480.00
0.0060 oh Kepala tukang 67,000.00 402.00
0.0018 oh Mandor 58,000.00 104.40
3,986.40 13,281.00 17,267.40
3 SNI 1 M' Pasang pipa PVC 1/2" :
1.2000 m' Pipa PVC 6,250.00 7,500.00
0.3500 ls Perlengkapan 35 % harga pipa 6,250.00 2,187.50
0.0360 oh Pekerja 46,000.00 1,656.00
0.0600 oh Tukang ledeng 58,000.00 3,480.00
0.0060 oh Kepala tukang 67,000.00 402.00
0.0018 oh Mandor 58,000.00 104.40
3,986.40 11,343.50 15,329.90
4 SNI 1 M' Pasang pipa PVC 2" :
1.2000 m' Pipa PVC 12,500.00 15,000.00
0.3500 ls Perlengkapan 35 % harga pipa 12,500.00 4,375.00
0.0810 oh Pekerja 46,000.00 3,726.00
0.1350 oh Tukang ledeng 58,000.00 7,830.00
0.0140 oh Kepala tukang 67,000.00 938.00
0.0041 oh Mandor 58,000.00 237.80
9,005.80 23,101.00 32,106.80
5 SNI 1 M' Pasang pipa PVC 4" :
1.2000 m' Pipa PVC 20,000.00 24,000.00
0.3500 ls Perlengkapan 35 % harga pipa 20,000.00 7,000.00
0.0810 oh Pekerja 46,000.00 3,726.00
0.1350 oh Tukang ledeng 58,000.00 7,830.00
0.0140 oh Kepala tukang 67,000.00 938.00
0.0041 oh Mandor 58,000.00 237.80
9,005.80 34,726.00 43,731.80
6 Dihitung 1 BH Bak kontrol :
0.2750 m2 Pas.batu bata 1:8 85,952.50 23,636.94
0.0100 m3 Pas. koral 4,000.00 40.00
0.0031 m3 Pasir urug 107,980.00 337.44
0.4070 m2 Plester 1:8 38,988.60 15,868.36
0.0156 m3 Galian tanah 35,950.00 561.72
40,444.45
7 Dihitung 1 M' Saluran U 20 :
0.4000 m2 Pas. batu bata 1:8 85,952.50 34,381.00
0.2400 m2 Plesteran 1:8 38,988.60 9,357.26
0.0100 m3 Pasir urug 107,980.00 1,079.80
0.0400 m3 Galian tanah 35,950.00 1,438.00
1.0000 m' Buis beton U 20 38,000.00 38,000.00
84,256.06
8 Dihitung 1 M' Saluran O 20 :
0.4000 m2 Pas. batu bata 1:8 85,952.50 34,381.00
0.0100 m3 Pasir urug 107,980.00 1,079.80
0.0400 m3 Galian tanah 38,000.00 1,520.00
1.0000 m' Buis beton O 20 30,000.00 30,000.00
66,980.80
HARGA UPAH HARGA
NO KODE ANALISA PEKERJAAN SATUAN PEKERJA BAHAN JUMLAH
(Rp.) (Rp.) (Rp.) (Rp.)
L. PEKERJAAN PAVING
1 1 M2 Pasang paving blok :
45.0000 bh paving holland t = 5 cm 1,220.00 54,900.00
0.0800 m3 pasir beton 258,000.00 20,640.00
0.4000 oh pekerja 46,000.00 18,400.00
0.2000 oh tukang batu 58,000.00 11,600.00
0.0200 oh kepala tukang 67,000.00 1,340.00
0.0200 oh mandor 58,000.00 1,160.00
32,500.00 75,540.00 108,040.00

KETERANGAN :
1 M3 Pasir Beton = 1400 kg / m3 ( harga 1 m3 pasir / 1400 )
1 M3 Kerikil = 1350 kg / m3 ( harga 1 m3 kerikil / 1350 )
1 zak semen 40 kg = ( harga 1 zak semen / 40 kg )
RENCANA ANGGARAN BIAYA

PROGRAM : KONSERVASI KEANEKARAGAMAN HAYATI DAN PERLINDUNGAN HUTAN


PEKERJAAN : REHABILITASI PONDOK KERJA KAPURAN II ( 70 M2 )
LOKASI : KAPURAN, KARIMUNJAWA
TAHUN ANGGARAN : 2013

NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

A. PEKERJAAN ADMINISTRASI & DOKUMENTASI


1 Pekerjaan Administrasi 1.00 ls 100,000.00 100,000.00
2 Pekerjaan Dokumentasi 1.00 ls 150,000.00 150,000.00
250,000.00

B. PEKERJAAN PERSIAPAN
1 Langsiran 1.00 ls 1,000,000.00 1,000,000.00
2 Bongkaran 1.00 ls 1,500,000.00 1,500,000.00
3 Pembersihan lapangan 1.00 ls 150,000.00 150,000.00
4 Utzet / Bowplank 1.00 ls 200,000.00 200,000.00
2,850,000.00

C. REHAB PONDOK KERJA KAPURAN II ( 70 M2 )


I. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah pondasi setempat ( kanopi + rollag ) 1.65 m3 35,950.00 59,245.60
2 Urugan tanah kembali 0.49 m3 14,670.00 7,252.85
3 Urugan pasir bawah pondasi t = 5 cm 0.23 m3 107,980.00 25,159.34
91,657.79

II. PEKERJAAN PASANGAN


1 Pasang pondasi batu belah 1:8 ( setempat ) 0.40 m3 573,322.00 229,328.80
2 Pasang rollag batu bata 1:8 3.66 m2 85,952.50 314,586.15
3 Pasang batu bata 1:8 ( peninggian dinding + gunungan + mainan + pot ) 33.18 m2 85,952.50 2,852,247.76
4 Plesteran 1:8 ( baru + rehab ) 66.37 m2 33,892.40 2,249,370.80
5 Plesteran beton 1:5 ( topi-topi + plat atap ) 27.60 m2 38,988.60 1,076,182.83
6 Pekerjaan acian 93.97 m2 21,206.25 1,992,761.92
7 Pasang batu tempel (paras) pilar kolom 2.75 m2 187,213.75 515,212.24
8 Sponengan 177.14 m' 13,028.50 2,307,868.49
9 Membuat logo kehutanan dari bahan cat 1.00 ls 100,000.00 100,000.00
11,637,558.99

III. PEKERJAAN BETON BERTULANG


1 Beton bertulang sloof 15x20 0.37 m3 3,307,472.85 1,210,535.06
2 Beton bertulang kolom praktis ( kanopi baru + peninggian ) 0.63 m3 4,840,836.21 3,071,510.57
3 Beton bertulang ring balok + gunungan 15x20 2.03 m3 4,535,313.90 9,211,222.54
4 Beton balok 15x15 ( B1, B2 dan B3 ) 1.72 m3 4,840,836.21 8,332,289.32
5 Beton bertulang plat topi-topi t = 8 cm 0.43 m3 4,590,062.04 1,982,906.80
6 Beton bertulang plat atap t = 10 cm 1.83 m3 3,835,171.49 7,017,788.54
7 Beton bertulang plat meja dapur t = 8 cm 0.09 m3 4,590,062.04 414,207.20
31,240,460.04

IV. PEKERJAAN KAYU DAN BESI


1 Kusen alumunium PJ1 1.00 bh 1,608,750.00 1,608,750.00
2 Kusen alumunium PJ2 1.00 bh 1,316,030.00 1,316,030.00
3 Kusen alumunium P1 3.00 bh 479,940.00 1,439,820.00
4 Daun pintu PVC km/wc P2 1.00 unit 300,000.00 300,000.00
5 Kusen alumunium J1 6.00 bh 573,280.00 3,439,680.00
6 Kusen alumunium BV 2.00 bh 187,290.00 374,580.00
7 Daun pintu panil kayu bengkirai 9.24 m2 593,250.00 5,481,630.00
8 Besi teralis jendela / boven 9.67 m2 250,000.00 2,418,450.00
9 Kaca bening 5 mm 5.34 m2 80,000.00 427,328.00
16,806,268.00

V. PEKERJAAN ATAP
1 Kuda - kuda baja ringan 108.09 m2 160,000.00 17,294,080.00
2 Listplank GRC 41.92 m' 25,000.00 1,048,000.00
3 Genteng kodok ( lama pasang kembali ) 108.09 m2 12,250.00 1,324,078.00
4 Bubungan genteng kodok 11.80 m' 71,912.00 848,561.60
5 Pasang plastik bawah genteng 108.09 m2 5,000.00 540,440.00
21,055,159.60
NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

VI. PEKERJAAN PLAFOND


1 Plafond gypsum 9 mm rangka hollow galvanis 54.42 m2 69,170.00 3,764,231.40
2 Plafond kalsiboard 4 mm rangka hollow galvanis ( km/wc ) 3.76 m2 65,530.00 246,556.63
3 Compon plat atap kanopi samping 8.74 m2 16,973.87 148,411.01
4 List gypsum 88.50 m' 11,125.00 984,562.50
5,143,761.54
NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

VII. PEKERJAAN LANTAI


1 Pasang lantai keramik 40x40 60.71 m2 110,873.00 6,730,545.47
2 Pasang keramik 20x20 km/wc 2.98 m2 134,195.00 399,901.10
3 Pasang keramik 20x25 dinding t = 1,50 m dan bak km/wc 13.22 m2 138,195.00 1,827,490.68
4 Pasang keramik 20x20 meja + dinding meja pantry 2.75 m2 138,195.00 380,671.95
5 Pasang keramik border 7x20 ( km/wc & meja pantry ) 9.97 m' 35,000.50 348,954.99
6 Rabat beton 1:3:5 lantai kanopi t = 5 cm 0.48 m3 765,953.29 366,929.92
10,054,494.10

VIII. PEKERJAAN LISTRIK


1 Instalasi listrik baru 18.00 ttk 130,000.00 2,340,000.00
2 Lampu electrik 18 W 9.00 bh 40,000.00 360,000.00
3 Lampu electrik 11 W 2.00 bh 25,000.00 50,000.00
4 Stop kontak 7.00 bh 30,000.00 210,000.00
5 Saklar tunggal 6.00 bh 25,000.00 150,000.00
6 Saklar ganda 3.00 bh 30,000.00 90,000.00
7 Box MCB, Arde 1.00 ls 150,000.00 150,000.00
3,350,000.00

IX. PEKERJAAN CAT


1 Cat dinding 326.10 m2 13,901.10 4,533,211.26
2 Cat plafond 66.93 m2 13,901.10 930,345.02
3 Cat kayu 18.48 m2 31,789.00 587,460.72
4 Cat genteng 108.09 m2 27,821.10 3,007,127.06
9,058,144.06

X. PEKERJAAN SANITASI
1 Klosed jongkok 1.00 bh 200,000.00 200,000.00
2 Floor drain 1.00 bh 25,000.00 25,000.00
3 Kran 2.00 bh 30,000.00 60,000.00
4 Pipa penguras bak 1.00 bh 15,000.00 15,000.00
5 Kitchen zink 1.00 unit 300,000.00 300,000.00
6 Pipa PVC AW 3/4" ( air bersih dari pipa 1" tower ke rumah ) 7.72 m' 17,267.40 133,304.33
7 Pipa PVC AW 2" ( pipa air kotor ) 3.10 m' 32,106.80 99,531.08
8 Pipa PVC AW 4" ( dari klosed ke septick tank ) 7.50 m' 43,731.80 327,988.50
1,160,823.91

D. TOWER TANK DAN GROUND TANK


I. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah ( groundtank & foot plat ) 7.50 m3 44,010.00 330,075.00
2 Urugan kembali 2.25 m3 14,670.00 33,007.50
3 Urugan pasir bawah groundtank + foot plat t = 5 cm 0.31 m3 107,980.00 33,743.75
396,826.25

II. PEKERJAAN BETON


1 Beton bertulang foot plat 100 x 100 4.00 bh 516,438.45 2,065,753.79
2 Beton bertulang kolom 20 x 20 0.96 m3 5,914,143.41 5,677,577.67
3 Beton bertulang balok 15 x 25 ( atas ) 0.23 m3 5,594,293.42 1,258,716.02
4 Beton bertulang balok 15 x 25 ( ikat tengah ) 0.23 m3 5,594,293.42 1,258,716.02
5 Beton bertulang plat tower t = 10 cm 0.29 m3 3,835,171.49 1,108,364.56
6 Beton bertulang sloof 15 x 20 ( ground tank + tower ) 0.18 m3 3,990,709.23 718,327.66
7 Beton bertulang balok 15 x 20 ( ground tank ) 0.18 m3 5,325,609.16 958,609.65
5 Beton bertulang plat dinidng, lantai, penutup ( ground tank ) t = 10 cm 1.29 m3 3,835,171.49 4,951,206.39
17,997,271.75

III. PEKERJAAN PASANGAN DAN ASESORIES


1 Pasang batu bata tanggulan tower 1:8 1.32 m2 85,952.50 113,457.30
2 Plesteran beton 1:5 41.94 m2 38,988.60 1,635,181.88
3 Pekerjaan acian 41.94 m2 21,206.25 889,390.13
4 Pasang keramik 30x30 ( groun tank ) 8.86 m2 136,265.00 1,207,648.56
5 Sponengan 127.25 m' 13,028.50 1,657,876.63
5,503,554.50

IV. PEKERJAAN CAT


1 Cat dinding ( tower ) 41.94 m2 13,901.10 583,012.13
583,012.13
RENCANA ANGGARAN BIAYA

PROGRAM : KONSERVASI KEANEKARAGAMAN HAYATI DAN PERLINDUNGAN HUTAN


PEKERJAAN : REHABILITASI PONDOK KERJA KAPURAN III ( 70 M2 )
LOKASI : KAPURAN, KARIMUNJAWA
TAHUN ANGGARAN : 2013

NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

A. PEKERJAAN ADMINISTRASI & DOKUMENTASI


1 Pekerjaan Administrasi 1.00 ls 100,000.00 100,000.00
2 Pekerjaan Dokumentasi 1.00 ls 150,000.00 150,000.00
250,000.00

B. PEKERJAAN PERSIAPAN
1 Langsiran 1.00 ls 1,000,000.00 1,000,000.00
2 Bongkaran 1.00 ls 1,500,000.00 1,500,000.00
3 Pembersihan lapangan 1.00 ls 150,000.00 150,000.00
4 Utzet / Bowplank 1.00 ls 200,000.00 200,000.00
2,850,000.00

C. REHAB PONDOK KERJA KAPURAN III ( 70 M2 )


I. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah pondasi setempat ( kanopi + rollag ) 1.65 m3 35,950.00 59,245.60
2 Urugan tanah kembali 0.49 m3 14,670.00 7,252.85
3 Urugan pasir bawah pondasi t = 5 cm 0.23 m3 107,980.00 25,159.34
91,657.79

II. PEKERJAAN PASANGAN


1 Pasang pondasi batu belah 1:8 ( setempat ) 0.40 m3 573,322.00 229,328.80
2 Pasang rollag batu bata 1:8 3.66 m2 85,952.50 314,586.15
3 Pasang batu bata 1:8 ( peninggian dinding + gunungan + mainan + pot ) 33.18 m2 85,952.50 2,852,247.76
4 Plesteran 1:8 ( baru + rehab ) 66.37 m2 33,892.40 2,249,370.80
5 Plesteran beton 1:5 ( topi-topi + plat atap ) 27.60 m2 38,988.60 1,076,182.83
6 Pekerjaan acian 93.97 m2 21,206.25 1,992,761.92
7 Pasang batu tempel (paras) pilar kolom 2.75 m2 187,213.75 515,212.24
8 Sponengan 175.09 m' 13,028.50 2,281,160.07
9 Membuat logo kehutanan dari bahan cat 1.00 ls 100,000.00 100,000.00
11,610,850.57

III. PEKERJAAN BETON BERTULANG


1 Beton bertulang sloof 15x20 0.37 m3 3,307,472.85 1,210,535.06
2 Beton bertulang kolom praktis ( kanopi baru + peninggian ) 0.63 m3 4,840,836.21 3,071,510.57
3 Beton bertulang ring balok + gunungan 15x20 2.03 m3 4,535,313.90 9,211,222.54
4 Beton balok 15x15 ( B1, B2 dan B3 ) 1.58 m3 4,840,836.21 7,651,546.73
5 Beton bertulang plat topi-topi t = 8 cm 0.43 m3 4,590,062.04 1,982,906.80
6 Beton bertulang plat atap t = 10 cm 1.83 m3 3,835,171.49 7,017,788.54
7 Beton bertulang plat meja dapur t = 8 cm 0.09 m3 4,590,062.04 414,207.20
30,559,717.45

IV. PEKERJAAN KAYU DAN BESI


1 Kusen alumunium PJ1 1.00 bh 1,608,750.00 1,608,750.00
2 Kusen alumunium PJ2 1.00 bh 1,316,030.00 1,316,030.00
3 Kusen alumunium P1 3.00 bh 479,940.00 1,439,820.00
4 Daun pintu PVC km/wc P2 1.00 unit 300,000.00 300,000.00
5 Kusen alumunium J1 6.00 bh 573,280.00 3,439,680.00
6 Kusen alumunium BV 2.00 bh 187,290.00 374,580.00
7 Daun pintu panil kayu bengkirai 9.24 m2 593,250.00 5,481,630.00
8 Besi teralis jendela / boven 9.67 m2 250,000.00 2,418,450.00
9 Kaca bening 5 mm 5.34 m2 80,000.00 427,328.00
16,806,268.00

V. PEKERJAAN ATAP
1 Kuda - kuda baja ringan 108.09 m2 160,000.00 17,294,080.00
2 Listplank GRC 41.92 m' 25,000.00 1,048,000.00
3 Genteng kodok baru 108.09 m2 62,250.00 6,728,478.00
4 Bubungan genteng kodok 11.80 m' 71,912.00 848,561.60
5 Pasang plastik bawah genteng 108.09 m2 5,000.00 540,440.00
26,459,559.60

VI. PEKERJAAN PLAFOND


NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

1 Plafond gypsum 9 mm rangka hollow galvanis 54.42 m2 69,170.00 3,764,231.40


2 Plafond kalsiboard 4 mm rangka hollow galvanis ( km/wc ) 3.76 m2 65,530.00 246,556.63
3 Compon plat atap kanopi samping 8.74 m2 16,973.87 148,411.01
4 List gypsum 88.50 m' 11,125.00 984,562.50
5,143,761.54
NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

VII. PEKERJAAN LANTAI


1 Pasang lantai keramik 40x40 60.71 m2 110,873.00 6,730,545.47
2 Pasang keramik 20x20 km/wc 2.98 m2 134,195.00 399,901.10
3 Pasang keramik 20x25 dinding t = 1,50 m dan bak km/wc 13.22 m2 138,195.00 1,827,490.68
4 Pasang keramik 20x20 meja + dinding meja pantry 2.75 m2 138,195.00 380,671.95
5 Pasang keramik border 7x20 ( km/wc & meja pantry ) 9.97 m' 35,000.50 348,954.99
6 Rabat beton 1:3:5 lantai kanopi t = 5 cm 0.48 m3 765,953.29 366,929.92
10,054,494.10

VIII. PEKERJAAN LISTRIK


1 Instalasi listrik baru 18.00 ttk 130,000.00 2,340,000.00
2 Lampu electrik 18 W 9.00 bh 40,000.00 360,000.00
3 Lampu electrik 11 W 2.00 bh 25,000.00 50,000.00
4 Stop kontak 7.00 bh 30,000.00 210,000.00
5 Saklar tunggal 6.00 bh 25,000.00 150,000.00
6 Saklar ganda 3.00 bh 30,000.00 90,000.00
7 Box MCB, Arde 1.00 ls 150,000.00 150,000.00
3,350,000.00

IX. PEKERJAAN CAT


1 Cat dinding 326.10 m2 13,901.10 4,533,211.26
2 Cat plafond 66.93 m2 13,901.10 930,345.02
2 Cat kayu 18.48 m2 31,789.00 587,460.72
6,051,017.00

X. PEKERJAAN SANITASI
1 Klosed jongkok 1.00 bh 200,000.00 200,000.00
2 Floor drain 1.00 bh 25,000.00 25,000.00
3 Kran 2.00 bh 30,000.00 60,000.00
4 Pipa penguras bak 1.00 bh 15,000.00 15,000.00
5 Kitchen zink 1.00 unit 300,000.00 300,000.00
6 Pipa PVC AW 3/4" ( air bersih menyambung dari bangunan sebelah ) 8.72 m' 17,267.40 150,571.73
7 Pipa PVC AW 2" ( pipa air kotor ) 3.10 m' 32,106.80 99,531.08
8 Pipa PVC AW 4" ( dari klosed ke septick tank ) 2.00 m' 43,731.80 87,463.60
9 Saluran U 20 42.65 m' 84,256.06 3,593,521.13
10 Saluran gorong -gorong O 20 7.72 m' 66,980.80 517,091.78
11 Bak kontrol 5.00 bh 40,444.45 202,222.27
12 Grill penutup saluran U 20 7.33 m' 206,262.18 1,511,901.75
13 Grill penutup bak kontrol 2.00 bh 80,590.25 161,180.50
14 Septick tank dan resapan 1.00 unit 3,500,000.00 3,500,000.00
10,423,483.84

D. PENATAAN HALAMAN DEPAN


I. PEKERJAAN PAVING
1 Paving block holand tebal 5 cm 44.40 m2 108,040.00 4,796,976.00
4,796,976.00

E. PEMBUATAN TEMPAT JEMURAN


I. PEKERJAAN GALIAN DAN URUGAN
1 Galian tanah pondasi umpak 0.18 m3 35,950.00 6,605.81
2 Urugan kembali 0.06 m3 14,670.00 808.68
3 Urugan pasir bawah pondasi umpak t = 5 cm 0.02 m3 107,980.00 1,984.13
9,398.63

II. PEKERJAAN BETON


1 Cor pondai umpak 1:3:5 0.18 m3 765,953.29 140,743.92
140,743.92

III. PEKERJAAN BESI DAN ATAP


1 Tiang pipa GIP Ø 2" 9.00 m' 78,193.00 703,737.00
2 Rangka atap pipa GIP Ø 2" 11.05 m' 78,193.00 864,032.65
3 Gording pipa GIP Ø 1" 19.20 m' 57,453.00 1,103,097.60
4 Angkur besi 10 mm 0.74 kg 17,689.00 13,160.62
5 Plat baja 2 mm dudukan pipa ke dinding 1.88 kg 17,689.00 33,283.62
6 Fiser dan mur baut 12.00 bh 15,000.00 180,000.00
7 Penutup fiber gelombang ( sunroof ) 12.16 m2 38,581.50 469,151.04
3,366,462.53

IV. PEKERJAAN CAT


1 Cat besi 4.85 m2 31,789.00 154,161.73
154,161.73
NO. JENIS PEKERJAAN VOLUME SAT HARGA SATUAN JUMLAH HARGA JML. HARGA TOTAL

F. TOWER TANK DAN GROUND TANK


I. PEKERJAAN SANITASI
1 Tangki fiber @ 1000 ltr 1.00 unit 1,500,000.00 1,500,000.00
2 Pompa air 250 watt 1.00 unit 1,000,000.00 1,000,000.00
3 Pipa PVC AW 3/4" ( dari sumber air ke ground tank ) 21.00 m' 17,267.40 362,615.40
4 Pipa PVC AW 1" ( dari ground tank ke pompa ) 5.50 m' 17,267.40 94,970.70
5 Pipa PVC AW 3/4" ( dari pompa ke tower ) 10.00 m' 17,267.40 172,674.00
6 Pipa PVC AW 1" ( dari tower ke bangunan rumah ) 9.00 m' 17,267.40 155,406.60
7 Pipa PVC AW 3/4" ( pipa penguras dari tower ) 4.50 m' 17,267.40 77,703.30
8 Pelampung ( ground tank ) 1.00 unit 150,000.00 150,000.00
9 Stop kran PVC 3/4" dan 1" 2.00 bh 50,000.00 100,000.00
10 Tangga besi ( galvanised ) 1.00 unit 1,500,000.00 1,500,000.00
11 Tutup main holl dari plat besi ( rangka siku 30.30.3 dan plat besi 2 mm ) 1.00 unit 200,000.00 200,000.00
5,313,370.00
TIME SCHEDULE
PROGRAM : KONSERVASI KEANEKARAGAMAN HAYATI DAN PERLINDUNGAN HUTAN
PEKERJAAN : REHABILITASI PONDOK KERJA KAPURAN II ( 70 M2 )
: REHABILITASI PONDOK KERJA KAPURAN III ( 70 M2 )
LOKASI : KAPURAN, KARIMUNJAWA
TAHUN ANGGARAN : 2013

BULAN
Nilai
No. Uraian Pekerjaan JUNI JULI AGUSTUS SEPTEMBER KET
Bobot
01-09 10-16 17-23 24-30 01-07 08-14 15-21 22-28 29-04 05-11 12-18 19-25 26-01 02-08 09-15 16-22 23-28

A. PEKERJAAN ADMINISTRASI & DOKUMENTASI 0.089 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
B. PEKERJAAN PERSIAPAN 1.016 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060

C. REHAB PONDOK KERJA KAPURAN II ( 70 M2 )


I. PEKERJAAN GALIAN DAN URUGAN 0.033 0.017 0.017
II. PEKERJAAN PASANGAN 4.285 1.428 1.428 1.428
III. PEKERJAAN BETON BERTULANG 11.644 0.970 1.941 1.941 1.941 1.941 1.941 0.970
IV. PEKERJAAN KAYU DAN BESI 5.989 1.497 1.497 1.497 1.497
V. PEKERJAAN ATAP 7.543 2.514 2.514 2.514
VI. PEKERJAAN PLAFOND 1.840 0.153 0.307 0.307 0.307 0.307 0.307 0.153
VII. PEKERJAAN LANTAI 3.664 0.611 0.611 0.611 0.611 0.611 0.611
VIII. PEKERJAAN LISTRIK 1.194 0.299 0.299 0.299 0.299
IX. PEKERJAAN CAT 3.266 0.817 0.817 0.817 0.817
X. PEKERJAAN SANITASI 0.416 0.416

D. TOWER TANK DAN GROUND TANK


I. PEKERJAAN GALIAN DAN URUGAN 0.143 0.036 0.036 0.036 0.036
II. PEKERJAAN BETON 6.704 2.235 2.235 2.235
III. PEKERJAAN PASANGAN DAN ASESORIES 2.006 1.003 1.003
IV. PEKERJAAN CAT 0.211 0.211

A. PEKERJAAN ADMINISTRASI & DOKUMENTASI 0.089 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005 0.005
B. PEKERJAAN PERSIAPAN 1.016 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060 0.060

C. REHAB PONDOK KERJA KAPURAN III ( 70 M2 )


I. PEKERJAAN GALIAN DAN URUGAN 0.033 0.017 0.017
II. PEKERJAAN PASANGAN 4.275 1.425 1.425 1.425
III. PEKERJAAN BETON BERTULANG 11.389 0.949 1.898 1.898 1.898 1.898 1.898 0.949
IV. PEKERJAAN KAYU DAN BESI 5.989 1.497 1.497 1.497 1.497
V. PEKERJAAN ATAP 9.567 2.392 2.392 2.392 2.392
VI. PEKERJAAN PLAFOND 1.840 0.153 0.307 0.307 0.307 0.307 0.307 0.153
VII. PEKERJAAN LANTAI 3.664 0.611 0.611 0.611 0.611 0.611 0.611
VIII. PEKERJAAN LISTRIK 1.194 0.299 0.299 0.299 0.299
IX. PEKERJAAN CAT 2.186 0.547 0.547 0.547 0.547
X. PEKERJAAN SANITASI 3.771 3.771

D. PENATAAN HALAMAN DEPAN


I. PEKERJAAN PAVING 1.725 1.725

E. PEMBUATAN TEMPAT JEMURAN


I. PEKERJAAN GALIAN DAN URUGAN 0.003 0.002 0.002
II. PEKERJAAN BETON 0.052 0.013 0.013 0.013 0.013
III. PEKERJAAN BESI DAN ATAP 1.207 0.603 0.603
IV. PEKERJAAN CAT 0.055 0.055

F. TOWER TANK DAN GROUND TANK


I. PEKERJAAN SANITASI 1.898 1.898

Jumlah Nilai Pekerjaan 100.000


0.163 2.083 6.822 9.817 15.030 12.483 13.719 6.888 3.974 3.974 4.257 5.588 7.610 7.202 0.130 0.130 0.130
Rencana Kemajuan per Minggu
0 0.163 2.246 9.069 18.886 33.916 46.399 60.118 67.005 70.979 74.953 79.210 84.798 92.408 99.610 99.740 99.870 100.00