1 2 3 4
I HARGA SATUAN UPAH
1 Pekerja L.01 OH Rp 90.000,00
2 Tukang L.02 OH Rp 100.000,00
3 Kepala Tukang L.03 OH Rp 120.000,00
4 Mandor L.04 OH Rp 100.000,00
1 2 3 4
35 Sealant Kg Rp 25.000,00
36 Kunci Pintu Tanam 2 Putaran + Pegangan Bh Rp 250.000,00
37 Engsel Pintu Kuningan Bh Rp 40.000,00
38 Engsel Jendela Kuningan Bh Rp 25.000,00
39 Kunci selot Pintu Bh Rp 250.000,00
40 Kunci selot Jendela Bh Rp 25.000,00
41 Kait angin Bh Rp 25.000,00
42 Pegangan Pintu Bh Rp 750.000,00
43 Kunci Pintu Tanam 2 Putaran Biasa Bh Rp 250.000,00
44 Truss C75.75 chord, Al 55%, AZ 100 M' Rp 21.000,00
45 Reng Batten U38.045, Al 55%, AZ100 M' Rp 11.000,00
46 Strap Bracing M' Rp 25.000,00
47 Screw 12-14x20 HotDip Galvanized Bh Rp 875,00
48 Screw 10-16x16 HotDip Galvanized Bh Rp 875,00
49 Valley Gutter M' Rp 10.000,00
50 Anchord Bolt M10x77 Bh Rp 7.500,00
51 Seng Plat L. 40 cm Lbr Rp 25.000,00
52 Paku 2 cm Kg Rp 25.000,00
53 Nok standar aluminium M' Rp 32.500,00
54 Screw 10-16x16 HotDip Galvanized bh Rp 875,00
55 Atap Aluminium / Spandek 0,4 Lembar Rp 55.000,00
56 Granit 60 x 60 BH Rp 62.500,00
57 Besi hollow 40x40 cm M Rp 25.000,00
58 Cat Tembok Kg Rp -
59 Cat penutup 2x Kg Rp 50.000,00
60 Meny Besi Kg Rp 35.000,00
61 Kuas Bh Rp 6.000,00
62 Cat Meni Kayu Kg Rp 35.000,00
63 Plamir Kayu Kg Rp 10.000,00
64 Cat Kayu Kg Rp 37.500,00
65 Cat penutup 2 kali Kg Rp 75.000,00
66 Kuas Bh Rp 6.000,00
67 Ampelas Lbr Rp 5.000,00
68 Besi hollow 40x60 mm M1 Rp 58.000,00
69 Besi hollow 20x40 mm M1 Rp 16.500,00
70 Besi hollow 10x10 mm M1 Rp 8.000,00
71 Pcv ( Sunda Plafond ) M Rp 50.000,00