Anda di halaman 1dari 52

DAFTAR HARGA UPAH DAN BAHAN

PROYEK

No. TENAGA KERJA HARI UPAH (Rp./Hari)

1 Pekerja OH Rp 90,000.00
2 Tukang OH Rp 120,000.00
3 Kepala Tukang OH Rp 150,000.00
4 Mandor OH Rp 150,000.00

No. J E N I S MATERIAL SATUAN HARGA (Rp)

I. BAHAN BANGUNAN/PASANGAN
1 Batu Bata OVEN Bh Rp 420.00
2 Batu Pecah M3 Rp 462,753.00
3 Kerikil M3 Rp 200,000.00
4 Kerikil Kg Rp 148.15
5 Pasir Urug M3 Rp 120,000.00
6 Tanah Urug M3 Rp 75,000.00
7 Pasir Pasang M3 Rp 162,500.00
8 Pasir Cor/ Beton M3 Rp 187,000.00
9 Pasir Cor/ Beton Kg Rp 133.57
10 Sement Portland Type I (50 kg) Kg Rp 1,500.00
11 Semen Putih Kg Rp 2,350.00
12 Semen Warna Kg Rp 4,500.00
13 Air Liter Rp 350.00
14 Ijuk Kg Rp 26,250.00

II. BAHAN KAYU


1 Kayu Kelas I M3 Rp 7,100,000.00
2 Kayu Kelas II M3 Rp 1,600,000.00
3 Kayu Kelas III M3 Rp 1,600,000.00
4 Papan Kelas I M3 Rp 7,100,000.00
5 Papan Kelas II M3 Rp 1,600,000.00
6 Papan Kelas III M3 Rp 1,600,000.00
7 Plywood 3.6 mm Lbr Rp 58,700.00
8 Plywood 9 mm Lbr Rp 140,000.00
9 Kayu Dolken Btg Rp 26,000.00
10 Kayu cerucuk 6" panjang 4m Btg Rp 16,000.00
11 List Kayu profil M' Rp 4,200.00

III. BAHAN BESI, BAJA DAN PAKU


1 Besi Beton Kg Rp 12,000.00 13,100.000
2 Kawat Ikat Beton Kg Rp 22,000.00
3 Paku Atap Seng Kg Rp 28,800.00
4 Paku Kayu Kg Rp 20,000.00 16,500.000
5 Paku Sekrup Kg Rp 25,300.00
6 Paku Triplek Kg Rp 25,000.00
7 Paku Beton Bh Rp 1,000.00
IV. BAHAN ATAP DAN PLAFOND
1 Atap Genteng Metal Lbr Rp 39,000.00
2 Perabung Genteng Metal Lbr Rp 26,500.00
3 Bola-bola Atap Genteng Metal Lbr Rp 19,500.00
4 Supertruss C75 100 INT Kg Rp 20,250.00
5 Supertruss C75 75 INT Kg Rp 17,350.00
6 Topspan 40 055 INT Kg Rp 14,250.00
7 WTEKS 12-14 x 20 HWFS Class II Bh Rp 750.00
8 CSP 10-16x16 HWFS Class II Bh Rp 550.00
9 SG 10 Multiplate Bh Rp 5,500.00
10 Gypsum 9 mm Lbr Rp 70,000.00
11 List Gypsum M1 Rp 5,000.00
12 Papan Selembayung Ukir Bh Rp 300,000.00

V. BAHAN PENGGANTUNG /KACA


1 Kunci Tanam 2 x Putar Bh Rp 97,800.00
2 Grendel Pintu 4" Bh Rp 15,750.00
3 Grendel jendela 2" Bh Rp 10,500.00
4 Engsel Pintu 4" Bh Rp 14,700.00
5 Engsel Jendela 3" Bh Rp 11,200.00
6 Hak Angin Jendela Bh Rp 17,325.00
7 Handel pintu Set Rp 262,500.00
8 Handel jendela Bh Rp 28,875.00
9 Kaca Bening T = 6 mm M2 Rp 150,000.00

VI. BAHAN SANITASI


1 Kloset Jongkok Bh Rp 350,000.00
2 Floor Drain Bh Rp 64,000.00
3 Bak Air Fiberglass 0,3 M3 Bh Rp 262,500.00
4 Tanki Air Kapasitas 500 liter Bh Rp 682,500.00
5 Kran Air Keran Tembok S 5L Z 1/2'' Bh Rp 75,000.00
6 Pompa air automatik Bh Rp 594,000.00
7 Pipa PVC Dia 3" M' Rp 18,000.00
8 Pipa PVC Dia 3/4" M' Rp 10,300.00
9 Pipa PVC Dia 1/2" M' Rp 10,000.00
10 Pintu Fiber Set Rp 295,400.00

VII. BAHAN LANTAI DAN DINDING


Granit 80 x 80 m2 Rp 450,000.00 Rp 236,842.00
1 Keramik roman G 447322, G 447323 uk. 40x40 cm M2 Rp 97,500.00
2 Roman Keramik Floor Tile dCervia Misto size 20x20 M2 Rp 115,000.00 Rp 4,600.00
3 Keramik Roman 20x25 abu-abu polos M2 Rp 110,000.00
4 Batu Alam Palimanan 15 x 30 cm Bh Rp 3,750.00
5 Batu Alam Andesit rata alam 10 x 20 M2 Rp 108,000.00
VIII. BAHAN ELEKTRIKAL
1 Sekring Kas MCB Bh Rp 57,750.00
2 Titik Lampu Ttk Rp 190,000.00
3 Titik Stop Kontak Ttk Rp 190,000.00
4 Hannochs Lampu LED Avengers - 20 watt Bh Rp 40,000.00
5 Hannochs Lampu LED Avengers - 25 watt Bh Rp 55,000.00
6 SAKLAR PANASONIC WHITE ENGKEL+OUTBOW TUNGGAL Bh Rp 24,000.00
7 SAKLAR PANASONIC WHITE ENGKEL+OUTBOW GANDA Bh Rp 24,100.00
8 Saklar Panasonic Hitam / Style stok kontak - Putih Bh Rp 25,000.00
9 Fitting Lampu Panasonic Downlight Bh Rp 50,000.00

IX. BAHAN FINISHING


1 at minyak kayu besi avian 1kg Kg Rp 62,000.00
2 Cat Dasar Kg Rp 21,200.00
3 Cat Dulux Catylac 5 Kg Putih / 1501 / Warna / Cat Interior Galon Kg Rp 23,600.00
Cat Tembok Dulux CATYLAC EKSTERIOR Rp 38,200.00
4 Dempul Kg Rp 19,300.00
5 Thinner Ltr Rp 22,000.00
6 Cat Meni Kg Rp 25,200.00
7 Plamir Exterior DULUX WEATHERSHIELD 3,5 KG (Dempul Tembok Eksterior) Kg Rp 29,000.00
Plamir Interior DULUX Wall Filler 3,5 KG (Dempul Tembok Interior) Kg Rp 26,000.00
8 Amplas Lbr Rp 5,250.00
9 Kuas roll Bh Rp 28,875.00
10 Kuas 4" Bh Rp 10,500.00
11 Lem Kayu Kg Rp 27,300.00
12 Minyak bekisting Ltr Rp 8,400.00

Cat LUX clear gloss / penta super gloss 250ml Rp 44,900.00


Cat LUX clear gloss / penta super gloss 250m l/ 0,25L Rp 179,600.00
Vernis Luar Cat Kayu & Besi Emco Lux 1lt Clear Gloss Ltr Rp 56,000.00
Cat NC Duco Puffin NC Ducoat 1L Cat duco mobil, kayu, besi, plastik ltr Rp 68,000.00
DANAGLOSS NC Cat Duco Mobil (1 LITER) NC CLEAR ltr Rp 105,000.00
PERHITUNGAN VOLUME BANGUNAN
PROYEK : RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME
KAVLING : D6 STRUKTUR
Dimensi (M')
No KETERANGAN Luas (M2) Jumlah Luas Total (M2)
Lebar Panjang Dalam Tinggi

KAVLING 8.000 17.000 136.000 1.000 136.00


Grand Total (M2) 136.00

Pek. Pas. Bowplank


Dimensi (M')
No KETERANGAN Panjang (M1) Jumlah Panjang Total (M1)
Lebar Panjang Dalam Tinggi

Pek. Pas. Bowplank 8.000 8.000 2.000 16.00


17.000 17.000 2.000 34.00
Grand Total (M1) 50.00

Pek. Pas. Cerocok


Dimensi (M')
No KETERANGAN Panjang (M') Jumlah Panjang Total (M')
isi

Pek. Pas. Cerocok 20.000 4.000 16.000 320.00


Grand Total (btg) 320.00

CEROCOK BELUM TERPASANG 20.000 4.000 16.000 320.00


320.00

Pek.Galian Tanah Pondasi ,Sloof dan Rolak


Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Panjang Dalam Tinggi
Pek. Galian Pondasi
Tapak type Pondasi 0.800 0.800 0.800 0.800 16.000 12.80

BELUM DIKERJAKAN
Pek. Galian Pondasi
Tapak type Pondasi 0.800 0.800 0.800 0.800 4.000 3.20

Pek. Galian Sloof


Sloof type SL1
Sb. Vertikal 0.300 52.200 0.250 3.915 1.000 3.92
Sb. Herizontal 0.300 49.000 0.250 3.675 1.000 3.68
Grand Total (M3) 23.59
BELUM DIKERJAKAN
Pek. Galian Pondasi
Tapak type P1 0.800 0.800 0.800 0.800 16.000 12.80

Pek. Galian Sloof


Sloof type SL1
Sb. Vertikal 0.300 52.200 0.250 3.915 1.000 3.92
Sb. Herizontal 0.300 49.000 0.250 3.675 1.000 3.68
Grand Total (M3) 20.39

Pek. Urugan Tanah


Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Panjang Tinggi
Pek. Urugan Tanah di Bawah Bangunan
Teras 2.000 1.600 0.200 0.640 1.000 0.64
R.Tamu,Keluarga,Makan,K.Tidur, dapur 8.000 8.500 0.200 13.600 1.000 13.60
Kamar Belakang 3.500 3.500 0.200 2.450 1.000 2.45
Grand Total (M3) 16.69 4.173

Pek. Urugan Pasir Bawah Pondasi Setempat dan Rolak


Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Panjang Dalam Tinggi
Pek. Urugan Pasir Bawah Pondasi Setempat dan Rolak
Tapak type P1 0.800 0.800 0.050 0.032 16.000 0.51
Pek. Urugan Pasir Bawah Sloof
Sloof type SL1
Sb. Vertikal 0.250 52.200 0.050 0.653 1.000 0.65
Sb. Herizontal 0.250 49.000 0.050 0.613 1.000 0.61
Grand Total (M3) 1.78
Pek. Bekisting
Dimensi (M')
No KETERANGAN Luas (M2) Jumlah Luas Total (M2)
Lebar Panjang Tinggi Sisi
Pek. Bekesting Pondasi
Tapak type P1 0.800 0.800 0.400 2.000 1.280 16.000 20.48
20.48
Pek. Bekisting Sloof
Sloof
Sb. Vertikal 0.200 52.200 2.000 20.880 1.000 20.88
Sb. Herizontal 0.200 49.000 2.000 19.600 1.000 19.60
40.48

Pek. Bekisting Sloof


Sloof
Sb. Vertikal 0.200 8.000 2.000 3.200 1.000 3.20
Sb. Herizontal 0.200 8.000 2.000 3.200 1.000 3.20
6.40

Pek. Bekisting Kolom Pendestal


Pek. Bekisting Kolom
Kolom Type kp 0.120 0.120 0.400 2.000 0.192 16.000 3.07
3.07
Pek. Bekisting Kolom Praktis
Pek. Bekisting Kolom
Kolom Type lantai 0.120 0.120 3.600 1.000 0.864 16.000 13.82
6.91
BELUM DIKERJAKAN
Pek. Bekisting Kolom kp
Pek. Bekisting Kolom
Kolom Type lantai 0.100 0.100 3.600 2.000 1.440 16.000 23.04
Kolom Type Kp lantai 0.120 0.120 3.400 2.000 0.098 1.000 0.10

Pek. Bekisting Plate Kanopi elv +2,30 0.500 3.500 0.080 1.000 0.140 1.000 0.14
Pek. Bekisting Balok Letai elv +2,30 0.120 3.500 1.000 2.000 0.840 1.000 0.84

Pek. Bekisting Balok Ringbalk elv +3,60


Sb. Vertikal 0.200 52.200 10.440 1.000 10.44
Sb. Herizontal 0.200 49.000 9.800 1.000 9.80
20.24

sudah dikerjakan
Pek. Bekisting Balok Ringbalk elv +3,60
Sb. Vertikal 0.200 12.000 2.400 1.000 2.40
Sb. Herizontal 0.200 0.000 0.000 0.00
2.40

Pek. Bekisting Plate Atap elv + 3,40 1.500 23.500 1.000 35.250 1.000 35.25

Pek. Pembesian
Dimensi (M')
No KETERANGAN Jumlah Besi / 1 Item Jumlah Berat Total (Kg)
Panjang Diameter BJ BESI koefisien
Pek. Pondasi
Pondasi Type P1
Diameter 12
Tulangan Horizontal 1.860 0.012 0.887 1.650 5.000 16.000 131.99 149
Tulangan Vertikal 1.860 0.010 0.617 1.147 5.000 16.000 91.74 132
Over Lap 10 % 0.00
Grand Total (M2) 223.72
BELUM TERPASANG
Pek. Pondasi
Pondasi Type P1
Diameter 12
Tulangan Horizontal 1.860 0.012 0.887 1.650 5.000 4.000 33.00
Tulangan Vertikal 1.860 0.010 0.617 1.147 5.000 4.000 22.93
Over Lap 10 % 5.59
Grand Total (M2) 61.52

Pek. Pembesian Sloof


1 Sloof Type SL1
Diameter 12
Tulangan Utama 101.200 0.012 0.887 89.764 4.000 1.000 359.06
Over Lap 10 % 0.00
Diameter 6 359.06
Tulangan Begol 0.880 0.060 0.222 0.195 675.000 1.000 131.87
Over Lap 10 % 0.00
131.87
Grand Total (M2) 490.93

BELUM DIKERJAKAN
Pek. Pembesian Sloof
1 Sloof Type SL1
Diameter 12
Tulangan Utama 16.000 0.012 0.887 14.192 4.000 1.000 56.77
Over Lap 10 % 0.00
Diameter 6 56.77
Tulangan Begol 0.880 0.060 0.222 0.195 107.000 1.000 20.90
Over Lap 10 % 0.00
20.90
Grand Total (M2) 77.67

Pek. Pembesian Kolom type pendestal


Kolom Pendestal
Diameter 10
Tulangan Utama 0.800 0.010 0.617 0.494 4.000 1.974 3.90
Over Lap 10 % 0.39
4.29
Diameter 6
Tulangan Begol 0.460 0.060 0.222 0.102 5.000 0.511 0.26
Over Lap 10 % 0.03
0.29
Grand Total (M2) 4.57

Kolom Type Kolom Praktis


Diameter 10
Tulangan Utama 4.000 0.010 0.617 2.466 4.000 16.000 157.82
Over Lap 10 % 0.00
157.82
Diameter 6
Tulangan Begol 0.460 0.060 0.222 0.102 27.000 16.000 44.12
Over Lap 10 % 0.00
44.12
Grand Total (M2) 201.94
100.97
BELUM DIKERJAKAN
Kolom Type Kolom Praktis
Diameter 10
Tulangan Utama 4.000 0.010 0.617 2.466 4.000 0.000 0.00
Over Lap 10 % 0.00
0.00
Diameter 6
Tulangan Begol 0.460 0.060 0.222 0.102 27.000 0.000 0.00
Over Lap 10 % 0.00
0.00
Grand Total (M2) 0.00

Pek. Pembesian Ringbalk


Diameter 10
Tulangan Utama 101.200 0.010 0.617 62.390 4.000 1.000 249.56
Over Lap 10 % 0.00
249.56
Diameter 6
Tulangan Begol 0.560 0.060 0.222 0.124 675.000 1.000 83.92
Over Lap 10 % 0.00
83.92
Grand Total (M2) 333.48

sudah dikerjakan
Pek. Pembesian Ringbalk
Diameter 10
Tulangan Utama 12.000 0.010 0.617 7.398 4.000 1.000 29.59
Over Lap 10 % 0.00
29.59
Diameter 6
Tulangan Begol 0.560 0.060 0.222 0.124 80.000 1.000 9.95
Over Lap 10 % 0.00
9.95
Grand Total (M2) 39.54

Pek. Pembesian Balok Letai


Balok Letai
Diameter 10
Tulangan Utama 3.500 0.010 0.617 2.158 4.000 1.000 8.63
Over Lap 10 % 0.86
9.49
Diameter 8
Tulangan Begol 0.500 0.008 0.222 0.111 23.000 1.000 2.55
Over Lap 10 % 0.26
2.81
Grand Total (M2) 12.30
Pek. Pembesian Plat Kanopi/Leufel
Plat Kanopi
Diameter 10
Tulangan Utama 0.500 0.010 0.617 0.308 3.000 1.000 0.92
Over Lap 10 % 0.09
1.02
Diameter 8
Tulangan Begol 0.500 0.008 0.222 0.111 3.000 1.000 0.33
Over Lap 10 % 0.03
0.37
Grand Total (kg) 1.38
Pek. Pembesian Plat Dag Atap
Diameter 10
Tulangan 1.500 0.010 0.617 7.500 108.746 0.00
23.500 0.010 0.617 117.500 108.746 0.00
Grand Total (kg) 217.49

Pek. Cor Lantai Kerja K-100 Pondasi Setempat dan Rolak


Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Panjang Tinggi L
Pek. Cor Lantai Kerja K-100 Pondasi Setempat dan Rolak
Tapak type P1 0.800 0.800 0.050 0.032 16.000 0.51

Pek. Lantai dasar

Lantai rumah
teras 1.600 2.000 3.200 0.00

ruang tamu 2.500 5.000 0.650 2.000 13.800 0.00


Ruang Keluarga, R. Makan 4.500 5.000 1.500 2.000 25.500 0.00
Dapur 3.000 3.000 9.000 0.00
Kamar utama dan K. anak 3.500 3.500 3.000 3.000 21.250 0.00
72.750 4.365 4.37

Pek. Urugan Pasir


Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Panjang Tinggi Tinggi
Pek. Urugan Pasir di Bawah Bangunan
Teras 2.000 1.600 0.030 0.096 1.000 0.10
R.Tamu,Keluarga,Makan,K.Tidur, dapur 8.000 8.500 0.030 2.040 1.000 2.04
Kamar Belakang 3.500 3.500 0.030 0.368 1.000 0.37
Grand Total (M3) 2.50
Pek. Cor Beton cam 1:2:3
Dimensi (M')
No KETERANGAN Vol (M3) Jumlah Vol Total (M3)
Lebar Tinggi Panjang
Pek. Cor Beton Pondasi
Tapak type P1 0.800 0.300 0.800 0.192 16.000 3.07
BELUM DIKERJAKAN
Tapak type P1 0.800 0.300 0.800 0.192 4.000 0.77
Pek. Cor Beton Sloof
Sloof type SL1 0.150 0.250 101.200 3.795 1.000 3.80
BELUM DIKERJAKAN
Sloof type SL1 0.150 0.250 16.000 0.600 1.000 0.60

Pek. Cor Beton kolo praktis


Pek. Cor Beton 0.120 0.120 4.000 0.058 16.000 0.92
BELUM DIKERJAKAN
Pek. Cor Beton ( Kolom Pendestal )
Pek. Cor Beton ( Kolom Pendestal ) 0.120 0.120 0.400 0.006 0.000 0.00
Kolom Type kp 0.000 0.000 0.000 0.000 0.000 0.00

Pek. Cor Beton Plate Kanopi elv +2,30 0.500 4.000 0.060 0.120 1.000 0.12
Pek. Cor Beton Balok Letai elv +2,30 0.100 0.200 4.500 0.090 1.000 0.09
Pek. Cor Beton Balok Ringbalk elv +3,60 0.100 0.200 101.200 2.024 1.000 2.02
BELUM DIKERJAKAN
Pek. Cor Beton Balok Ringbalk elv +3,60 0.120 0.200 12.000 0.288 1.000 0.29

Pek. Cor Beton Plate Atap elv + 3,60 23.500 0.080 1.880 1.000 1.88
ARSITEKTUR
Pek.Pas Diding Bata 1 : 4
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Lebar Tinggi
Bangunan rumah
Sb. Vertikal 3.400 33.650 114.410 1.000 114.41
Sb. Herizontal 3.400 34.500 117.300 1.000 117.30
231.71
dikurang pintu 2.250 9.200 20.700 1.000 20.70
jendela 1.400 4.000 5.600 1.000 5.60
26.30
jumlah 205.41
BELUM DIKERJAKAN

Bangunan rumah
Sb. Vertikal 1.000 26.500 26.500 1.000 26.50
Sb. Herizontal 1.000 34.500 34.500 0.000 0.00
26.50
3.50
2.000
7.400
39.40
Pagar Belakang
Sb. Vertikal 2.800 3.500 9.800 1.000 9.80
Sb. Herizontal 2.800 4.000 11.200 1.000 11.20
jumlah 21.00
Pagar Depan
Sb. Vertikal 1.200 5.500 6.600 1.000 6.60
Sb. Herizontal 1.200 4.500 5.400 1.000 5.40
jumlah 12.00
Atap
Sb. Vertikal 0.200 23.000 4.600 1.000 4.60
Sb. Herizontal 0.200 14.000 2.800 1.000 2.80
jumlah 7.40
Pek.Plasteran dan aci 1 : 4
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Lebar kurang
rumah
Sb. Vertikal 3.400 33.650 2.000 66.300 162.520 1.000 162.52
Sb. Herizontal 3.400 34.500 2.000 11.900 222.700 1.000 222.70
385.22
dikurang pintu 2.250 10.400 23.400 1.000 23.40
jendela 1.400 2.000 2.800 1.000 2.80
26.20
jumlah 359.02

Pagar Belakang
Sb. Vertikal 2.800 3.500 9.800 1.000 9.80
Sb. Herizontal 2.800 4.000 11.200 1.000 11.20
21.00
Pagar Depan
Sb. Vertikal 1.200 5.500 6.600 1.000 6.60
Sb. Herizontal 1.200 4.500 5.400 1.000 5.40
jumlah 12.00
Atap
Sb. Vertikal 0.200 23.000 4.600 1.000 4.60
Sb. Herizontal 0.200 14.000 2.800 1.000 2.80
jumlah 7.40
Pek. Penutup Lantai (Keramik)
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Lebar Panjang Tinggi Tinggi
Lantai rumah
Granit Teras 80 x 80 Warna Gelap 1.600 2.000 3.200 1.000 3.20

Granit Ruang Tamu 80 x 80 Warna Terang 2.500 5.000 0.650 2.000 13.800 1.000 13.80
Granit Ruang Keluarga, R. Makan 80 x 80 Warna Terang 4.500 5.000 1.500 2.000 25.500 1.000 25.50
Granit Dapur 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Kamar utama dan K. anak 3.500 3.500 3.000 3.000 21.250 1.000 21.25
69.55
Plint Granit 10 x 80 Warna Terang
R. Tamu 16.050
R.Makan,R. Keluarga 21.500
Dapur 11.000
K. Tidur Anak 13.000
K. Tidur Utama 14.000 75.55
Dikurang lebar Pintu 9.000 9.00
jumlah 66.55 m'

Keramik KM 20 x 20 Warna Gelap 1.500 3.500 5.250 1.000 5.25


Jumlah 5.25
Luas lantai Keramik 78.00 m2

Keramik Dinding KM 13.000 2.000 pj 2.800 23.200 1.000 23.20


Keramik Dinding Dapur 10 x 10 3.000 1.000 3.000 1.000 3.00
Meja Dapur Granit 70 x 5 3.000 0.700 2.100 1.000 2.10
Jumlah 2.10
Grand Total (M3)
Pek. Rangka Atap 1/2 x a x t
atap 1 11.000 3.400 4.500 0.500 14.400 2.000 64.80
7.400 4.600 0.500 2.000 17.02
atap 2 2.000 2.000 2.000 8.00
3.450 1.700 0.500 1.000 2.93
atap 3 2.93
95.69
Pek. Lisplank 41.240 41.24

Pek. Plafond Gipsum Ruang Dalam


Dimensi (M')
No KETERANGAN Vol (M1) Jumlah Vol Total (M1)
Lebar Panjang Tinggi Tinggi

Lantai 1
Plafond Teras Depan 1.500 2.000 3.000 1.000 3.00
3.00
Plafond Teras Belakang 1.000 4.000 4.000 1.000 4.00
4.00
Plafond Ruang Tamu 3.000 5.000 1.000 2.000 17.000 1.000 17.00
Plafond Ruang Keluarga 4.000 4.000 16.000 1.000 16.00
Plafond Ruang Makan 4.000 4.000 16.000 1.000 16.00
Plafond Kamar Tidur Tamu 3.000 3.000 9.000 1.000 9.00
Plafond Dapur 3.000 4.000 12.000 1.000 12.00
70.00
Plafond Ruang Area Cuci Jemur 1.500 2.250 plint 0.610 3.985 1.000 3.99
Plafond KM A 1.500 1.750 2.625 1.000 2.63
6.61
jumlah 83.61
Pek. List plafond Gypsum
List Plafond Lantai 1
Vertikal 41.000
Herizontal 39.000 80.000 1.000 80.00
Jumlah 80.00
List Plafond Lantai 2
Vertikal 35.000
Herizontal 55.000 90.000 1.000 90.00
Jumlah 90.00
Grand Total (M') 170.00
Pek. Kusen Pintu Dan Jendela
Dimensi (M')
No KETERANGAN Vol (M') Jumlah Vol Total (M3)
Lebar Tinggi

Type P1 Kayu Kulim 6/12 1.400 2.200 5.800 1.000 5.80


Type P2 Kayu Kulim 6/12 0.800 2.200 5.200 4.000 20.80
Type P3 Kayu Kulim 6/12 0.700 2.200 5.100 4.000 20.40
47.00
Grand Total (M') 47.00
Type P4 Alumunium 1.200 2.200 5.600 2.000 11.20
Type J1 Alumunium 0.820 2.200 6.040 2.000 12.08
Type J2 Alumunium 0.800 1.800 5.200 2.000 10.40
Type BV Alumunium 0.300 0.700 2.000 1.000 2.00
24.48
Grand Total (M') 24.48
Pek. Daun Pintu Dan Jendela
Dimensi (M2)
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Lebar Panjang Tinggi Tinggi

Type P1 Kayu Kulim Panil swing 1.400 2.200 3.080 2.000 6.16
Type P2 Kayu Kulim Panil 0.800 2.200 1.760 4.000 7.04
Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi 0.700 2.200 1.540 4.000 6.16
19.36
Grand Total (M') 19.36

Type P4 Alumunium Sliding 2.800 2.200 6.160 4.000 24.64


Type P5 Alumunium Sliding 2.100 2.200 4.620 3.000 13.86
Type P6 Alumunium Sliding 1.400 2.200 3.080 2.000 6.16
44.66
Type J1 Alumunium panil kaca 5mm 0.400 2.200 0.880 2.000 1.76
Type J2 Alumunium panil kaca 5mm 0.400 1.800 0.720 2.000 1.44
Type BV Alumunium panil kaca 5mm 0.300 0.700 0.210 1.000 0.21
3.41
Grand Total (M2) 3.41
Pek. Besi hollow
Dimensi (M)
No KETERANGAN Vol (M2) Jumlah Vol Total (M)
Panjang Lebar Tinggi Sisi
Relling Tangga Motif Ukiran 5.000 1.000 5.000 1.000 5.00
Relling Balkon Depan Motif Ukiran 2.300 1.000 2.300 1.000 2.30
Relling Balkon Belakang Motif Ukiran 2.900 1.000 2.900 1.000 2.90
10.20
Atap Carport + Atap Acrilic 3.100 2.400 7.440 1.000 7.44
Atap Area Jemur + Atap Acrilic 1.500 2.250 3.375 1.000 3.38
Grand Total (M3) 10.82

Pek. Pengecatan Dinding Bagian Dalam


Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Sisi Tinggi
Lantai 1
Sb. Vertikal 3.400 31.500 2.000 22.500 191.700 1.000 191.70
Sb. Herizontal 3.400 27.000 2.000 0.000 183.600 1.000 183.60
375.30
dikurang pintu 2.250 10.400 23.400 1.000 23.40
jendela 1.400 2.000 2.800 1.000 2.80
26.20
jumlah 349.10
Lantai 2
Sb. Vertikal 3.200 31.000 2.000 18.000 180.400 1.000 180.40
Sb. Herizontal 3.200 35.500 2.000 227.200 1.000 227.20
407.60
dikurang pintu 2.250 14.400 32.400 1.000 32.40
jendela 1.400 3.000 4.200 1.000 4.20
36.60
jumlah 371.00
Grand Total (M3) 720.10
Pek. Pengecatan Dinding Bagian Luar
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Sisi Tinggi

Pagar
Sb. Vertikal 3.000 12.500 13.700 23.800 1.000 23.80
Sb. Herizontal 3.000 4.000 4.000 8.000 1.000 8.00
jumlah 31.80
Atap
Sb. Vertikal 0.820 18.000 14.760 1.000 14.76
Sb. Herizontal 0.820 10.000 8.200 1.000 8.20
jumlah 22.96
Grand Total (M2) 774.86
Pek. Penutup Lantai (Granit & Keramik)
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Lebar Panjang Tinggi Tinggi
Lantai 1
Granit Teras 80 x 80 Warna Gelap 1.500 2.000 3.000 1.000 3.00
Plint Granit 10 x 80 Warna Gelap 0.100 2.000 0.200 1.000 0.20
Jumlah 3.20
Granit Teras Belakang 80 x 80 Warna Gelap 1.000 4.000 4.000 1.000 4.00
Plint Granit 10 x 80 Warna Gelap 0.100 6.000 0.600 1.000 0.60
Jumlah 4.60
Granit Ruang Tamu 80 x 80 Warna Terang 3.000 5.000 1.000 2.000 17.000 1.000 17.00
Granit Ruang Keluarga 80 x 80 Warna Terang 4.000 4.000 16.000 1.000 16.00
Granit Ruang Makan 80 x 80 Warna Terang 4.000 4.000 16.000 1.000 16.00
Granit Kamar Tidur Tamu 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Dapur 80 x 80 Warna Terang 3.000 4.000 12.000 1.000 12.00
Plint Granit 10 x 80 Warna Terang 0.100 55.000 plint 0.990 4.510 1.000 4.51
Jumlah 74.51
Keramik Ruang Area Cuci Jemur 20 x 20 Warna gelap + Plint 1.500 2.250 plint 0.610 3.985 1.000 3.99
Keramik KM A 20 x 20 Warna Gelap 1.500 1.750 2.625 1.000 2.63
Jumlah 6.61
Keramik Dinding KM 1 - PJ 6.500 2.000 pj 4.525 8.475 1.000 8.48
Keramik Dinding Dapur 10 x 10 5.000 1.000 5.000 1.000 5.00
Jumlah 13.48
Meja Dapur Granit 70 x 5 5.000 0.700 3.500 1.000 3.50
Jumlah 3.50
Lantai 2
Granit Balkon 80 x 80 Warna Gelap 2.000 3.500 7.000 1.000 7.00
Plint Granit 10 x 80 Warna Gelap 18.000 0.100 1.800 1.000 1.80
8.80
Granit Kamar Tidur Utama 80 x 80 Warna Terang 3.000 3.500 1.500 1.000 12.000 1.000 12.00
Granit Kamar Tidur Anak A 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Kamar Tidur Anak B 80 x 80 Warna Terang 3.500 3.000 10.500 1.000 10.50
Granit Ruang Santai 80 x 80 Warna Terang 3.500 4.000 14.000 1.000 14.00
Plint Granit 10 x 80 Warna Terang 0.100 49.900 pj 0.680 4.310 1.000 4.31
Jumlah 49.81
Keramik KM B 20 x 20 1.500 1.800 2.700 1.000 2.70
Keramik KM Utama 20 x 20 1.500 2.000 3.000 1.000 3.00
Jumlah 5.70
Keramik Dinding KM B 20 x 40 2.000 6.600 pj 1.575 11.625 1.000 11.63
Keramik Dinding KM Utama 20 x 40 2.000 7.000 pj 1.575 12.425 1.000 12.43
Jumlah 24.05
Keramik Tangga + Plint 1.000 5.000 1.000 3.400 8.400 1.000 8.40
Jumlah 8.40

Granit 80 x 80 Gelap 12.00


Granit 80 x 80 Terang 124.32
Keramik Lantai KM dan Area Jemur 20 x 20 Gelap 12.31
Keramik Dinding KM 20 x 20 Terang 37.53
Keramik Dinding Dapur 10 x 10 Terang 3.50
Granit Meja Dapur 3.50
DAFTAR ANALISA HARGA SATUAN
MATA PEMBAYARAN : BOUWPLANK
SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala Tukang Batu / Kayu Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 17,250.00

B. BAHAN

1 Kayu 5/7x 4 m3 0.012 1,600,000.00 19,200.00


2 Paku Biasa 2" - 5" Kg 0.020 20,000.00 400.00
3 Kayu Papan 3/20 m3 0.007 1,600,000.00 11,200.00

JUMLAH HARGA BAHAN 30,800.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 48,050.00
D. OVERHEAD & KEUNTUNGAN 10 % 4,805.00
E. TOTAL HARGA SATUAN PEKERJAAN 52,855.00
UNTUK 5 X PEMAKAIAN 10,571.00

MATA PEMBAYARAN : PEMBERSIHAN LOKASI


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Mandor Hari orang 0.050 150,000.00 7,500.00

JUMLAH HARGA TENAGA 16,500.00

B. BAHAN

JUMLAH HARGA BAHAN -

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 16,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,650.00
E. TOTAL HARGA SATUAN PEKERJAAN 18,150.00

MATA PEMBAYARAN : GALIAN TANAH BIASA SEDALAM 1 M


SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.750 90,000.00 67,500.00


2 Mandor Hari orang 0.025 150,000.00 3,750.00

JUMLAH HARGA TENAGA 71,250.00

B. BAHAN

N/A

JUMLAH HARGA BAHAN -

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 71,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,125.00
E. TOTAL HARGA SATUAN PEKERJAAN 78,375.00
MATA PEMBAYARAN : GALIAN TANAH BIASA SEDALAM 2 M
SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.900 90,000.00 81,000.00


2 Mandor Hari orang 0.045 150,000.00 6,750.00

JUMLAH HARGA TENAGA 87,750.00

B. BAHAN

N/A

JUMLAH HARGA BAHAN -

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 87,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,775.00
E. TOTAL HARGA SATUAN PEKERJAAN 96,525.00

MATA PEMBAYARAN : URUG PASIR


SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Mandor Hari orang 0.010 150,000.00 1,500.00

JUMLAH HARGA TENAGA 28,500.00

B. BAHAN

1 Pasir urug M3 1.200 120,000.00 144,000.00

JUMLAH HARGA BAHAN 144,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 172,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 17,250.00
E. TOTAL HARGA SATUAN PEKERJAAN 189,750.00

MATA PEMBAYARAN : URUG TANAH


SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.250 90,000.00 22,500.00


2 Mandor Hari orang 0.025 150,000.00 3,750.00

JUMLAH HARGA TENAGA 26,250.00

B. BAHAN

1 Tanah murni M3 1.200 75,000.00 90,000.00

JUMLAH HARGA BAHAN 90,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 116,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 11,625.00
E. TOTAL HARGA SATUAN PEKERJAAN 127,875.00
MATA PEMBAYARAN : BEKISTING PONDASI / PILE CAP
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.260 90,000.00 23,400.00


2 Tukang Kayu Hari orang 0.130 120,000.00 15,600.00
3 Kepala Tukang Hari orang 0.026 150,000.00 3,900.00
4 Mandor Hari orang 0.026 150,000.00 3,900.00

JUMLAH HARGA TENAGA 46,800.00

B. BAHAN

1 Kayu Kelas III m3 0.040 1,600,000.00 64,000.00


2 Paku Biasa 2" - 5" Kg 0.300 20,000.00 6,000.00
3 Minyak Bekisting Ltr 0.100 8,400.00 840.00

JUMLAH HARGA BAHAN 70,840.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 117,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 11,764.00
E. TOTAL HARGA SATUAN PEKERJAAN 129,404.00
F. UNTUK 3 X PEMAKAIAN 43,134.67

MATA PEMBAYARAN : BEKISTING SLOOF


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Pekerja Hari orang 0.260 90,000.00 23,400.00
2 Tukang Kayu Hari orang 0.130 120,000.00 15,600.00
3 Kepala Tukang Hari orang 0.026 150,000.00 3,900.00
4 Mandor Hari orang 0.026 150,000.00 3,900.00

JUMLAH HARGA TENAGA 46,800.00

B. BAHAN
1 Kayu Kelas III m3 0.045 1,600,000.00 72,000.00
2 Paku Biasa 2" - 5" Kg 0.300 20,000.00 6,000.00
3 Minyak Bekisting Ltr 0.100 8,400.00 840.00

JUMLAH HARGA BAHAN 78,840.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 125,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 12,564.00
E. TOTAL HARGA SATUAN PEKERJAAN 138,204.00
F. UNTUK 3 X PEMAKAIAN 46,068.00

MATA PEMBAYARAN : BEKISTING KOLOM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA
1 Pekerja Hari orang 0.200 90,000.00 18,000.00
2 Tukang Kayu Hari orang 0.300 120,000.00 36,000.00
3 Kepala Tukang Hari orang 0.030 150,000.00 4,500.00
4 Mandor Hari orang 0.030 150,000.00 4,500.00

JUMLAH HARGA TENAGA 63,000.00

B. BAHAN

1 Kayu Kelas III m3 0.040 1,600,000.00 64,000.00


2 Paku Biasa 2" - 5" Kg 0.400 20,000.00 8,000.00
3 Minyak Bekisting Ltr 0.200 8,400.00 1,680.00
4 Balok Kayu Kelas II m3 0.015 1,600,000.00 24,000.00
5 Plywood tebal 9mm Lbr 0.350 140,000.00 49,000.00
6 Dolken diameter 8 - 10 cm / 4 m Btg 2.000 26,000.00 52,000.00

JUMLAH HARGA BAHAN 198,680.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 261,680.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,168.00
E. TOTAL HARGA SATUAN PEKERJAAN 287,848.00
F. UNTUK 3 X PEMAKAIAN 95,949.33
MATA PEMBAYARAN : BEKISTING BALOK
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.200 90,000.00 18,000.00


2 Tukang Kayu Hari orang 0.300 120,000.00 36,000.00
3 Kepala Tukang Hari orang 0.030 150,000.00 4,500.00
4 Mandor Hari orang 0.030 150,000.00 4,500.00

JUMLAH HARGA TENAGA 63,000.00

B. BAHAN

1 Kayu Kelas III m3 0.040 1,600,000.00 64,000.00


2 Paku Biasa 2" - 5" Kg 0.400 20,000.00 8,000.00
3 Minyak Bekisting Ltr 0.200 8,400.00 1,680.00
4 Balok Kayu Kelas II m3 0.018 1,600,000.00 28,800.00
5 Plywood tebal 9mm Lbr 0.350 140,000.00 49,000.00
6 Dolken diameter 8 - 10 cm / 4 m Btg 2.000 26,000.00 52,000.00

JUMLAH HARGA BAHAN 203,480.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 266,480.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,648.00
E. TOTAL HARGA SATUAN PEKERJAAN 293,128.00
F. UNTUK 3 X PEMAKAIAN 97,709.33

MATA PEMBAYARAN : BEKISTING PLAT


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Tukang Kayu Hari orang 0.240 120,000.00 28,800.00
3 Kepala Tukang Hari orang 0.024 150,000.00 3,600.00
4 Mandor Hari orang 0.024 150,000.00 3,600.00

JUMLAH HARGA TENAGA 63,000.00

B. BAHAN

1 Kayu Kelas III m3 0.040 1,600,000.00 64,000.00


2 Paku Biasa 2" - 5" Kg 0.400 20,000.00 8,000.00
3 Minyak Bekisting Ltr 0.200 8,400.00 1,680.00
4 Balok Kayu Kelas II m3 0.015 1,600,000.00 24,000.00
5 Plywood tebal 9mm Lbr 0.350 140,000.00 49,000.00
6 Dolken diameter 8 - 10 cm / 4 m Btg 6.000 26,000.00 156,000.00

JUMLAH HARGA BAHAN 302,680.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 365,680.00
D. OVERHEAD & KEUNTUNGAN 10 % 36,568.00
E. TOTAL HARGA SATUAN PEKERJAAN 402,248.00
F. UNTUK 3 X PEMAKAIAN 134,082.67
MATA PEMBAYARAN : BEKISTING DINDING
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Tukang Kayu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 49,500.00

B. BAHAN

1 Kayu Kelas III m3 0.030 1,600,000.00 48,000.00


2 Paku Biasa 2" - 5" Kg 0.400 20,000.00 8,000.00
3 Minyak Bekisting Ltr 0.200 8,400.00 1,680.00
4 Balok Kayu Kelas II m3 0.020 1,600,000.00 32,000.00
5 Plywood tebal 9mm Lbr 0.350 140,000.00 49,000.00
6 Dolken diameter 8 - 10 cm / 4 m Btg 3.000 26,000.00 78,000.00
7 Form Tie / penjaga jarak bekisting / spacer Bh 4.000 26,000.00 104,000.00

JUMLAH HARGA BAHAN 320,680.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 370,180.00
D. OVERHEAD & KEUNTUNGAN 10 % 37,018.00
E. TOTAL HARGA SATUAN PEKERJAAN 407,198.00
F. UNTUK 3 X PEMAKAIAN 135,732.67

MATA PEMBAYARAN : BEKISTING TANGGA


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.320 90,000.00 28,800.00


2 Tukang Kayu Hari orang 0.165 120,000.00 19,800.00
3 Kepala Tukang Hari orang 0.033 150,000.00 4,950.00
4 Mandor Hari orang 0.006 150,000.00 900.00

JUMLAH HARGA TENAGA 54,450.00

B. BAHAN

1 Kayu kelas II m3 0.030 1,600,000.00 48,000.00


2 Paku Biasa 2" - 5" Kg 0.400 20,000.00 8,000.00
3 Minyak Bekisting Ltr 0.150 8,400.00 1,260.00
4 Balok Kayu Kelas II m3 0.015 1,600,000.00 24,000.00
5 Plywood tebal 9mm Lbr 0.350 140,000.00 49,000.00
6 Dolken diameter 8 - 10 cm / 4 m Btg 2.000 26,000.00 52,000.00

JUMLAH HARGA BAHAN 182,260.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 236,710.00
D. OVERHEAD & KEUNTUNGAN 10 % 23,671.00
E. TOTAL HARGA SATUAN PEKERJAAN 260,381.00
F. UNTUK 3 X PEMAKAIAN 86,793.67
MATA PEMBAYARAN : PASANG KAYU CERUCUK
SATUAN PEKERJAAN : BTG

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang Batu Hari orang 0.200 120,000.00 24,000.00
3 Kepala Tukang Hari orang 0.020 150,000.00 3,000.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 38,250.00

B. BAHAN

1 Kayu cerucuk dia 10-15 cm Btg 1.000 16,000.00 16,000.00

JUMLAH HARGA BAHAN 16,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 54,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,425.00
E. TOTAL HARGA SATUAN PEKERJAAN 59,675.00

MATA PEMBAYARAN : LANTAI KERJA K-100


SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 1.200 90,000.00 108,000.00


2 Tukang Batu Hari orang 0.200 120,000.00 24,000.00
3 Kepala Tukang Hari orang 0.020 150,000.00 3,000.00
4 Mandor Hari orang 0.060 150,000.00 9,000.00

JUMLAH HARGA TENAGA 144,000.00

B. BAHAN

1 Semen portland Kg 230.000 1,500.00 345,000.00


2 Pasir beton Kg 893.000 133.57 119,279.29
3 Kerikil Kg 1027.000 148.15 152,148.15
4 Air lt 200.000 350.00 70,000.00

JUMLAH HARGA BAHAN 686,427.43

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 830,427.43
D. OVERHEAD & KEUNTUNGAN 10 % 83,042.74
E. TOTAL HARGA SATUAN PEKERJAAN 913,470.18

MATA PEMBAYARAN : BETON K-175, SLUMP 12+/-2, WC : 0.66


SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 1.650 90,000.00 148,500.00


2 Tukang Batu Hari orang 0.275 120,000.00 33,000.00
3 Kepala Tukang Hari orang 0.028 150,000.00 4,200.00
4 Mandor Hari orang 0.083 150,000.00 12,450.00

JUMLAH HARGA TENAGA 198,150.00

B. BAHAN

1 Semen portland Kg 326.000 1,500.00 489,000.00


2 Pasir Beton Kg 760.000 133.57 101,514.29
3 Kerikil Kg 1029.000 148.15 152,444.44
4 Air lt 215.000 350.00 75,250.00

JUMLAH HARGA BAHAN 818,208.73

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,016,358.73
D. OVERHEAD & KEUNTUNGAN 10 % 101,635.87
E. TOTAL HARGA SATUAN PEKERJAAN 1,117,994.60
MATA PEMBAYARAN : Beton Mutu Fc=21,7 MPa (K250), Slump (12+/-2) cm, w/c = 0,56
SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN 0.000 HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 1.650 - -


2 Tukang Batu Hari orang 0.275 90,000.00 24,750.00
3 Kepala Tukang Hari orang 0.028 120,000.00 3,360.00
4 Mandor Hari orang 0.083 150,000.00 12,450.00

JUMLAH HARGA TENAGA 40,560.00

B. BAHAN

1 Semen portland Kg 384.000 - -


2 Pasir Beton Kg 692.000 1,500.00 1,038,000.00
3 Kerikil Kg 1039.000 133.57 138,780.71
4 Air lt 215.000 148.15 31,851.85

JUMLAH HARGA BAHAN 1,208,632.57

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,249,192.57
D. OVERHEAD & KEUNTUNGAN 10 % 124,919.26
E. TOTAL HARGA SATUAN PEKERJAAN 1,374,111.82

MATA PEMBAYARAN : PEMBESIAN


SATUAN PEKERJAAN : KG

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.007 90,000.00 630.00


2 Tukang Besi Hari orang 0.007 120,000.00 840.00
3 Kepala Tukang Hari orang 0.001 150,000.00 105.00
4 Mandor Hari orang 0.000 150,000.00 60.00

JUMLAH HARGA TENAGA 1,635.00

B. BAHAN

1. Besi Tulangan Kg 1.050 12,000.00 12,600.00


2. Kawat Beton Kg 0.015 22,000.00 330.00

JUMLAH HARGA BAHAN 12,930.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 14,565.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,456.50
E. TOTAL HARGA SATUAN PEKERJAAN 16,021.50

MATA PEMBAYARAN : PASANGAN BATA MERAH TEBAL 1 BATA, 1 PC: 2 PS


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.600 90,000.00 54,000.00


2 Tukang Batu Hari orang 0.200 120,000.00 24,000.00
3 Kepala Tukang Hari orang 0.020 150,000.00 3,000.00
4 Mandor Hari orang 0.030 150,000.00 4,500.00

JUMLAH HARGA TENAGA 85,500.00

B. BAHAN

1. Bata Merah Bh 140.000 420.00 58,800.00


2. Semen portland Kg 43.500 1,500.00 65,250.00
3. Pasir Pasang m3 0.080 162,500.00 13,000.00

JUMLAH HARGA BAHAN 137,050.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 222,550.00
D. OVERHEAD & KEUNTUNGAN 10 % 22,255.00
E. TOTAL HARGA SATUAN PEKERJAAN 244,805.00

MATA PEMBAYARAN : PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC: 2 PS


SATUAN PEKERJAAN : M2
NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN
SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 42,750.00

B. BAHAN

1. Bata Merah Bh 70.000 420.00 29,400.00


2. Semen portland Kg 18.950 1,500.00 28,425.00
3. Pasir Pasang m3 0.038 162,500.00 6,175.00

JUMLAH HARGA BAHAN 64,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 106,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 10,675.00
E. TOTAL HARGA SATUAN PEKERJAAN 117,425.00
MATA PEMBAYARAN : PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC: 4 PS
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.320 90,000.00 28,800.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 44,550.00

B. BAHAN

1. Bata Merah Bh 70.000 420.00 29,400.00


2. Semen portland Kg 11.500 1,500.00 17,250.00
3. Pasir Pasang m3 0.043 162,500.00 6,987.50

JUMLAH HARGA BAHAN 53,637.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 98,187.50
D. OVERHEAD & KEUNTUNGAN 10 % 9,818.75
E. TOTAL HARGA SATUAN PEKERJAAN 108,006.25

MATA PEMBAYARAN : KOLOM PRAKTIS


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.180 90,000.00 16,200.00


2 Tukang Batu Hari orang 0.020 120,000.00 2,400.00
3 Tukang Kayu Hari orang 0.020 120,000.00 2,400.00
4 Tukang Besi Hari orang 0.020 120,000.00 2,400.00
5 Kepala Tukang Hari orang 0.006 150,000.00 900.00
6 Mandor Hari orang 0.009 150,000.00 1,350.00

JUMLAH HARGA TENAGA 25,650.00

B. BAHAN

1 Kayu Kelas III m3 0.002 1,600,000.00 3,200.00


2 Paku Biasa 2" - 5" Kg 0.010 20,000.00 200.00
3 Besi Tulangan BJTP-24 kg 3.000 14,565.00 43,695.00
4 Kawat beton kg 0.450 22,000.00 9,900.00
5 Semen portland Kg 4.000 1,500.00 6,000.00
6 Pasir beton m3 0.006 187,000.00 1,122.00
7 Kerikil m3 0.009 200,000.00 1,800.00

JUMLAH HARGA BAHAN 65,917.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 91,567.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,156.70
E. TOTAL HARGA SATUAN PEKERJAAN 100,723.70

MATA PEMBAYARAN : PLESTER 1 PC : 4 PS, TEBAL 1,5 CM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Tukang Batu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 49,500.00

B. BAHAN

1 Semen portland Kg 6.240 1,500.00 9,360.00


2 Pasir Pasang m3 0.024 162,500.00 3,900.00

JUMLAH HARGA BAHAN 13,260.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 62,760.00
D. OVERHEAD & KEUNTUNGAN 10 % 6,276.00
E. TOTAL HARGA SATUAN PEKERJAAN 69,036.00
MATA PEMBAYARAN : PLESTER 1 PC : 2 PS, TEBAL 1,5 CM
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.300 90,000.00 27,000.00


2 Tukang Batu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.015 150,000.00 2,250.00

JUMLAH HARGA TENAGA 49,500.00

B. BAHAN

1 Semen portland Kg 10.224 1,500.00 15,336.00


2 Pasir Pasang m3 0.020 162,500.00 3,250.00

JUMLAH HARGA BAHAN 18,586.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 68,086.00
D. OVERHEAD & KEUNTUNGAN 10 % 6,808.60
E. TOTAL HARGA SATUAN PEKERJAAN 74,894.60

MATA PEMBAYARAN : ACI


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.200 90,000.00 18,000.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.010 150,000.00 1,500.00

JUMLAH HARGA TENAGA 33,000.00

B. BAHAN

1 Semen portland Kg 3.250 1,500.00 4,875.00

JUMLAH HARGA BAHAN 4,875.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 37,875.00
D. OVERHEAD & KEUNTUNGAN 10 % 3,787.50
E. TOTAL HARGA SATUAN PEKERJAAN 41,662.50

MATA PEMBAYARAN : PLAMIR


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.020 90,000.00 1,800.00


2 Tukang Kayu Hari orang 0.030 120,000.00 3,600.00
3 Kepala Tukang Hari orang 0.003 150,000.00 450.00
4 Mandor Hari orang 0.001 150,000.00 150.00

JUMLAH HARGA TENAGA 6,000.00

B. BAHAN

1 Plamir ICI Kg 0.100 29,000.00 2,900.00

JUMLAH HARGA BAHAN 2,900.00

C. ALAT

1 Ampelas Lbr 0.500 5,250.00 2,625.00


2 Kapek Bh 0.050 10,500.00 525.00

JUMLAH HARGA BAHAN 3,150.00

D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 12,050.00
E. OVERHEAD & KEUNTUNGAN 10 % 1,205.00
F. TOTAL HARGA SATUAN PEKERJAAN 13,255.00
MATA PEMBAYARAN : CAT MINYAK
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.070 90,000.00 6,300.00


2 Tukang Kayu Hari orang 0.009 120,000.00 1,080.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.003 150,000.00 375.00

JUMLAH HARGA TENAGA 8,655.00

B. BAHAN

1 Cat Meni Kg 0.200 25,200.00 5,040.00


2 Cat Dasar Kayu Kg 0.170 62,000.00 10,540.00
3 Cat Penutup 2x Kg 0.260 62,000.00 16,120.00

JUMLAH HARGA BAHAN 31,700.00

C. ALAT

1 Kuas Bh 0.010 10,500.00 105.00

JUMLAH HARGA BAHAN 105.00

D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 40,460.00
E. OVERHEAD & KEUNTUNGAN 10 % 4,046.00
F. TOTAL HARGA SATUAN PEKERJAAN 44,506.00

MATA PEMBAYARAN : 1 m2. Lapis melamin duco (2x lapis sampai rata)
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.075 90,000.00 6,750.00


2 Tukang Cat Hari orang 0.900 120,000.00 108,000.00
3 Kepala Tukang Hari orang 0.090 150,000.00 13,500.00
4 Mandor Hari orang 0.003 150,000.00 375.00

JUMLAH HARGA TENAGA 128,625.00

B. BAHAN

1 Cat NC Duco Puffin NC Ducoat 1L Kg 0.500 68,000.00 34,000.00


2 Kertas gosok no. 150 Lbr 1.000 2,000.00 2,000.00
3 clear Kg 0.200 105,000.00 21,000.00
Thinner A Ltr 0.837 22,000.00
Sewa alat bantu @ 3 alat Set 1.000 -
Sewa compresor Jam 0.625 -

JUMLAH HARGA BAHAN 57,000.00

D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 185,625.00
E. OVERHEAD & KEUNTUNGAN 10 % 18,562.50
F. TOTAL HARGA SATUAN PEKERJAAN 204,187.50

MATA PEMBAYARAN : CAT AIR


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.040 90,000.00 3,600.00


2 Tukang Kayu Hari orang 0.030 120,000.00 3,600.00
3 Kepala Tukang Hari orang 0.003 150,000.00 450.00
4 Mandor Hari orang 0.002 150,000.00 300.00

JUMLAH HARGA TENAGA 7,950.00

B. BAHAN

1 Plamir m2 1.000 12,050.00 12,050.00


2 Cat Kg 0.470 23,600.00 11,092.00
JUMLAH HARGA BAHAN 23,142.00

C. ALAT

1 Roll Bh 0.010 28,875.00 288.75

JUMLAH HARGA BAHAN 288.75

D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 31,380.75
E. OVERHEAD & KEUNTUNGAN 10 % 3,138.08
F. TOTAL HARGA SATUAN PEKERJAAN 34,518.83
MATA PEMBAYARAN : LANTAI KERAMIK 40 X 40 CM
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.700 90,000.00 63,000.00


2 Tukang Batu Hari orang 0.350 120,000.00 42,000.00
3 Kepala Tukang Hari orang 0.035 150,000.00 5,250.00
4 Mandor Hari orang 0.035 150,000.00 5,250.00

JUMLAH HARGA TENAGA 115,500.00

B. BAHAN

1 Keramik 40 x 40 cm bh 6.250 15,600.00 97,500.00


2 Semen portland Kg 10.000 1,500.00 15,000.00
3 Pasir Pasang m3 0.045 162,500.00 7,312.50
4 Semen Warna Kg 1.300 4,500.00 5,850.00

JUMLAH HARGA BAHAN 125,662.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 241,162.50
D. OVERHEAD & KEUNTUNGAN 10 % 24,116.25
E. TOTAL HARGA SATUAN PEKERJAAN 265,278.75

MATA PEMBAYARAN : LANTAI KERAMIK 30 X 30 CM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.700 90,000.00 63,000.00


2 Tukang Batu Hari orang 0.350 120,000.00 42,000.00
3 Kepala Tukang Hari orang 0.035 150,000.00 5,250.00
4 Mandor Hari orang 0.035 150,000.00 5,250.00

JUMLAH HARGA TENAGA 115,500.00

B. BAHAN

1 Keramik 30 x 30 cm bh 11.000 5,500.00 60,500.00


2 Semen portland Kg 10.000 1,500.00 15,000.00
3 Pasir Pasang m3 0.045 162,500.00 7,312.50
4 Semen Warna Kg 1.300 4,500.00 5,850.00

JUMLAH HARGA BAHAN 88,662.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 204,162.50
D. OVERHEAD & KEUNTUNGAN 10 % 20,416.25
E. TOTAL HARGA SATUAN PEKERJAAN 224,578.75

MATA PEMBAYARAN : LANTAI GRANIT 80 X 80 CM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN 0.000 HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.700 90,000.00 63,000.00


2 Tukang Batu Hari orang 0.350 120,000.00 42,000.00
3 Kepala Tukang Hari orang 0.035 150,000.00 5,250.00
4 Mandor Hari orang 0.035 150,000.00 5,250.00

JUMLAH HARGA TENAGA 115,500.00

B. BAHAN

1 Granit 80 x80 cm bh 1.562 236,842.00 369,947.20


2 Semen portland Kg 10.000 1,500.00 15,000.00
3 Pasir Pasang m3 0.045 162,500.00 7,312.50
4 Semen Warna Kg 1.300 4,500.00 5,850.00

JUMLAH HARGA BAHAN 398,109.70

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 513,609.70
D. OVERHEAD & KEUNTUNGAN 10 % 51,360.97
E. TOTAL HARGA SATUAN PEKERJAAN 564,970.67
MATA PEMBAYARAN : LANTAI KERAMIK 20 X 20 CM
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN 0.000 HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.700 90,000.00 63,000.00


2 Tukang Batu Hari orang 0.350 120,000.00 42,000.00
3 Kepala Tukang Hari orang 0.035 150,000.00 5,250.00
4 Mandor Hari orang 0.035 150,000.00 5,250.00

JUMLAH HARGA TENAGA 115,500.00

B. BAHAN

1 Keramik 20 x 20 cm bh 25.000 4,600.00 115,000.00


2 Semen portland Kg 10.000 1,500.00 15,000.00
3 Pasir Pasang m3 0.045 162,500.00 7,312.50
4 Semen Warna Kg 1.300 4,500.00 5,850.00

JUMLAH HARGA BAHAN 143,162.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 258,662.50
D. OVERHEAD & KEUNTUNGAN 10 % 25,866.25
E. TOTAL HARGA SATUAN PEKERJAAN 284,528.75

MATA PEMBAYARAN : LANTAI KERAMIK ANTI SELIP 20 X 20 CM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.700 90,000.00 63,000.00


2 Tukang Batu Hari orang 0.350 120,000.00 42,000.00
3 Kepala Tukang Hari orang 0.035 150,000.00 5,250.00
4 Mandor Hari orang 0.035 150,000.00 5,250.00

JUMLAH HARGA TENAGA 115,500.00

B. BAHAN

1 Keramik 20 x 20 cm bh 25.000 4,600.00 115,000.00


2 Semen portland Kg 10.000 1,500.00 15,000.00
3 Pasir Pasang m3 0.045 162,500.00 7,312.50
4 Semen Warna Kg 1.300 4,500.00 5,850.00

JUMLAH HARGA BAHAN 143,162.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 258,662.50
D. OVERHEAD & KEUNTUNGAN 10 % 25,866.25
E. TOTAL HARGA SATUAN PEKERJAAN 284,528.75

MATA PEMBAYARAN : DINDING KERAMIK 20 x 25 CM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.900 90,000.00 81,000.00


2 Tukang Batu Hari orang 0.450 120,000.00 54,000.00
3 Kepala Tukang Hari orang 0.045 150,000.00 6,750.00
4 Mandor Hari orang 0.045 150,000.00 6,750.00

JUMLAH HARGA TENAGA 148,500.00

B. BAHAN

1 Keramik dinding 20 x 25 cm bh 20.000 5,500.00 110,000.00


2 Semen portland Kg 9.300 1,500.00 13,950.00
3 Pasir Pasang m3 0.018 162,500.00 2,925.00
4 Semen Warna Kg 1.940 4,500.00 8,730.00

JUMLAH HARGA BAHAN 135,605.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 284,105.00
D. OVERHEAD & KEUNTUNGAN 10 % 28,410.50
E. TOTAL HARGA SATUAN PEKERJAAN 312,515.50

MATA PEMBAYARAN : 1 m plint granit (10 x 80) cm


SATUAN PEKERJAAN : M2
Analisa harga satuan SNI 7395:2008 No.6.22
NO. URAIAN SATUAN 0.000 HARGA JUMLAH KETERANGAN
SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.090 90,000.00 8,100.00


2 Tukang Batu Hari orang 0.090 120,000.00 10,800.00
3 Kepala Tukang Hari orang 0.009 150,000.00 1,350.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 21,000.00

B. BAHAN

1 Plint Granit 10 x 80 bh 1.200 23,684.00 28,420.80


2 semen portland Kg 1.140 1,500.00 1,710.00
3 Pasir pasang m3 0.003 162,500.00 487.50
4 air Kg 0.100 4,500.00 450.00

JUMLAH HARGA BAHAN 31,068.30

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 52,068.30
D. OVERHEAD & KEUNTUNGAN 10 % 5,206.83
E. TOTAL HARGA SATUAN PEKERJAAN 57,275.13

MATA PEMBAYARAN : 1 m plint ubin teraso ukuran (10 x 30) cm


SATUAN PEKERJAAN : M2
Analisa harga satuan SNI 7395:2008 No.6.22

NO. URAIAN SATUAN 0.000 HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.090 90,000.00 8,100.00


2 Tukang Batu Hari orang 0.090 120,000.00 10,800.00
3 Kepala Tukang Hari orang 0.009 150,000.00 1,350.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 21,000.00

B. BAHAN

1 Plint ubin teraso bh 3.530 7,500.00 26,475.00


2 semen portland Kg 1.140 1,500.00 1,710.00
3 Pasir pasang m3 0.003 162,500.00 487.50
4 air Kg 0.100 4,500.00 450.00

JUMLAH HARGA BAHAN 29,122.50

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 50,122.50
D. OVERHEAD & KEUNTUNGAN 10 % 5,012.25
E. TOTAL HARGA SATUAN PEKERJAAN 55,134.75

MATA PEMBAYARAN : RANGKA LANGIT-LANGIT


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.150 90,000.00 13,500.00


2 Tukang Kayu Hari orang 0.300 120,000.00 36,000.00
3 Kepala Tukang Hari orang 0.030 150,000.00 4,500.00
4 Mandor Hari orang 0.075 150,000.00 11,250.00

JUMLAH HARGA TENAGA 65,250.00

B. BAHAN

1 Kayu Kelas III M3 0.015 1,600,000.00 24,640.00


2 Paku Biasa Kg 0.200 20,000.00 4,000.00

JUMLAH HARGA BAHAN 28,640.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 93,890.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,389.00
E. TOTAL HARGA SATUAN PEKERJAAN 103,279.00

MATA PEMBAYARAN : LISTPLANK KAYU


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang Kayu Hari orang 0.200 120,000.00 24,000.00
3 Kepala Tukang Hari orang 0.020 150,000.00 3,000.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 36,750.00

B. BAHAN

1 Kayu Kelas III M3 0.011 1,600,000.00 17,280.00


2 Paku Biasa Kg 0.100 20,000.00 2,000.00

JUMLAH HARGA BAHAN 19,280.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 56,030.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,603.00
E. TOTAL HARGA SATUAN PEKERJAAN 61,633.00

MATA PEMBAYARAN : Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow


SATUAN PEKERJAAN : M2
Analisa Harga Satuan Pekerjaan Penutup Langit-langit (AHS SNI 2011)

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala tukang Hari orang 0.005 150,000.00 750.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 16,500.00

B. BAHAN

1 Hollow 4/4 Zincromate Btg 0.415 29,200.00 12,118.00


2 Hollow 2/4 Zincromate Btg 0.150 22,600.00 3,390.00
3 Gypsum board ( 120 x 240 x 9 ) mm Lbr 0.364 79,800.00 29,047.20
4 Paku gypsum kg 0.110 17,500.00 1,925.00
5 Ramset / dina bolt Bh 4.000 7,200.00 28,800.00
6 Cotton plaster Bh 0.072 15,000.00 1,080.00
7 Compoun Zak 0.125 75,000.00 9,375.00

JUMLAH HARGA BAHAN 85,735.20

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 102,235.20
D. OVERHEAD & KEUNTUNGAN 10 % 10,223.52
E. TOTAL HARGA SATUAN PEKERJAAN 112,458.72

MATA PEMBAYARAN : 1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow


SATUAN PEKERJAAN : M2
Analisa Harga Satuan Pekerjaan Penutup Langit-langit (AHS SNI 2011)

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala tukang Hari orang 0.005 150,000.00 750.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 16,500.00

B. BAHAN

1 Hollow 4/4 Zincromate Btg 0.415 29,200.00 12,118.00


2 Hollow 2/4 Zincromate Btg 0.150 22,600.00 3,390.00
3 GRC ( 120 x 240 x 4 ) mm Lbr 0.364 58,000.00 21,112.00
4 Paku GRC kg 0.110 35,000.00 3,850.00
5 Ramset / dina bolt Bh 4.000 7,200.00 28,800.00
6 Cotton plaster Bh 0.072 15,000.00 1,080.00
7 Compoun Zak 0.125 75,000.00 9,375.00

JUMLAH HARGA BAHAN 79,725.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 96,225.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,622.50
E. TOTAL HARGA SATUAN PEKERJAAN 105,847.50

MATA PEMBAYARAN : PLAFOND GYPSUMBOARD 9 MM


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.100 90,000.00 9,000.00


2 Tukang Kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala Tukang Hari orang 0.005 150,000.00 750.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 16,500.00

B. BAHAN

1 Gypsum board (120x240x9) mm Lbr 0.364 70,000.00 25,480.00


2 Paku Gypsum Kg 0.110 25,000.00 2,750.00

JUMLAH HARGA BAHAN 28,230.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 44,730.00
D. OVERHEAD & KEUNTUNGAN 10 % 4,473.00
E. TOTAL HARGA SATUAN PEKERJAAN 49,203.00
MATA PEMBAYARAN : PLAFOND PIRI-PIRI 2/10 CM
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.360 90,000.00 32,400.00


2 Tukang Kayu Hari orang 0.180 120,000.00 21,600.00
3 Kepala Tukang Hari orang 0.180 150,000.00 27,000.00
4 Mandor Hari orang 0.030 150,000.00 4,500.00

JUMLAH HARGA TENAGA 85,500.00

B. BAHAN

1 Kayu Kelas III M3 0.007 1,600,000.00 11,200.00


2 Paku Biasa Kg 0.010 20,000.00 200.00

JUMLAH HARGA BAHAN 11,400.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 96,900.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,690.00
E. TOTAL HARGA SATUAN PEKERJAAN 106,590.00

MATA PEMBAYARAN : GYPSUM CORNICE UKURAN 10 x 10 CM


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.060 90,000.00 5,400.00


2 Tukang Kayu Hari orang 0.060 120,000.00 7,200.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.003 150,000.00 450.00

JUMLAH HARGA TENAGA 13,950.00

B. BAHAN

1 Gypsum Cornice Ukuran 10 x 10 Cm M1 1.050 5,000.00 5,250.00

JUMLAH HARGA BAHAN 5,250.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 19,200.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,920.00
E. TOTAL HARGA SATUAN PEKERJAAN 21,120.00

MATA PEMBAYARAN : 1 M¹ List Langit-langit Gypsum 10 cm


SATUAN PEKERJAAN : M1
Analisa Harga Satuan Pekerjaan Penutup Langit-langit (AHS SNI 2011)

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.050 90,000.00 4,500.00


2 Tukang Kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala Tukang Hari orang 0.005 150,000.00 750.00
4 Mandor Hari orang 0.003 150,000.00 450.00

JUMLAH HARGA TENAGA 11,700.00

B. BAHAN

1 List gypsum M1 1.050 8,500.00 8,925.00


2 Tepung gypsum Kg 0.150 12,500.00 1,875.00

JUMLAH HARGA BAHAN 10,800.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 22,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,250.00
E. TOTAL HARGA SATUAN PEKERJAAN 24,750.00
MATA PEMBAYARAN : LIST PROFIL KAYU
SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.050 90,000.00 4,500.00


2 Tukang Kayu Hari orang 0.050 120,000.00 6,000.00
3 Kepala Tukang Hari orang 0.005 150,000.00 750.00
4 Mandor Hari orang 0.003 150,000.00 450.00

JUMLAH HARGA TENAGA 11,700.00

B. BAHAN

1 List Kayu M1 1.050 4,200.00 4,410.00


2 Paku Biasa Kg 0.010 20,000.00 200.00

JUMLAH HARGA BAHAN 4,610.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 16,310.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,631.00
E. TOTAL HARGA SATUAN PEKERJAAN 17,941.00
MATA PEMBAYARAN : KUDA-KUDA BAJA RINGAN
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.400 90,000.00 36,000.00


2 Tukang Besi Hari orang 0.600 120,000.00 72,000.00
3 Kepala Tukang Hari orang 0.020 150,000.00 3,000.00
4 Mandor Hari orang 0.020 150,000.00 3,000.00

JUMLAH HARGA TENAGA 114,000.00

B. BAHAN

1 Supertruss C75 100 INT Kg 2.850 20,250.00 57,712.50


2 Supertruss C75 75 INT Kg 3.670 17,350.00 63,674.50
3 Topspan 40 055 INT Kg 0.340 14,250.00 4,845.00
4 WTEKS 12-14 x 20 HWFS Class II Bh 11.400 750.00 8,550.00
5 CSP 10-16x16 HWFS Class II Bh 12.020 550.00 6,611.00
6 SG 10 Multiplate Bh 0.130 5,500.00 715.00

JUMLAH HARGA BAHAN 142,108.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 256,108.00
D. OVERHEAD & KEUNTUNGAN 10 % 25,610.80
E. TOTAL HARGA SATUAN PEKERJAAN 281,718.80

MATA PEMBAYARAN : GENTENG METAL


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.200 90,000.00 18,000.00


2 Tukang Kayu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.010 150,000.00 1,500.00

JUMLAH HARGA TENAGA 33,000.00

B. BAHAN

1 Genteng Metal m2 1.020 48,750.00 49,725.00


2 Paku Atap Genteng Metal kg 0.200 28,800.00 5,760.00

JUMLAH HARGA BAHAN 55,485.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 88,485.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,848.50
E. TOTAL HARGA SATUAN PEKERJAAN 97,333.50

MATA PEMBAYARAN : PASANG PERABUNG GENTENG METAL


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.250 90,000.00 22,500.00


2 Tukang Kayu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.013 150,000.00 1,950.00

JUMLAH HARGA TENAGA 44,700.00

B. BAHAN

1 Nok Genteng Metal Lbr 1.000 26,500.00 26,500.00


2 Paku Atap Genteng Metal Kg 0.050 28,800.00 1,440.00

JUMLAH HARGA BAHAN 27,940.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 72,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,264.00
E. TOTAL HARGA SATUAN PEKERJAAN 79,904.00
MATA PEMBAYARAN : BOLA-BOLA ATAP
SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.200 90,000.00 18,000.00


2 Tukang Kayu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.013 150,000.00 1,950.00

JUMLAH HARGA TENAGA 40,200.00

B. BAHAN

1 Bola-bola Atap Lbr 0.500 19,500.00 9,750.00


2 Paku Atap Genteng Metal Kg 0.050 28,800.00 1,440.00

JUMLAH HARGA BAHAN 11,190.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 51,390.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,139.00
E. TOTAL HARGA SATUAN PEKERJAAN 56,529.00

MATA PEMBAYARAN : MEMASANG 1 BUAH CLOSET JONGKOK


SATUAN PEKERJAAN : SET

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 1.000 90,000.00 90,000.00


2 Tukang Batu Hari orang 1.500 120,000.00 180,000.00
3 Kepala Tukang Hari orang 0.150 150,000.00 22,500.00
4 Mandor Hari orang 0.016 150,000.00 2,400.00

JUMLAH HARGA TENAGA 294,900.00

B. BAHAN

1 Closed Jongkok Bh 1.000 350,000.00 350,000.00


2 Sement Portland Kg 6.000 1,500.00 9,000.00
3 Pasir Pasang M3 0.010 162,500.00 1,625.00

JUMLAH HARGA BAHAN 360,625.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 655,525.00
D. OVERHEAD & KEUNTUNGAN 10 % 65,552.50
E. TOTAL HARGA SATUAN PEKERJAAN 721,077.50

MATA PEMBAYARAN : Kloset Duduk TOTO CW420


SATUAN PEKERJAAN : SET

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 3.300 90,000.00 297,000.00


2 Tukang Batu Hari orang 1.100 120,000.00 132,000.00
3 Kepala Tukang Hari orang 0.001 150,000.00 150.00
4 Mandor Hari orang 0.160 150,000.00 24,000.00

JUMLAH HARGA TENAGA 453,150.00

B. BAHAN

1 Kloset Duduk TOTO CW420 Bh 1.000 1,800,000.00 1,800,000.00


2 Sement Portland Kg 6.000 20,250.00 121,500.00
3 Pasir Pasang M3 0.010 39,000.00 390.00

JUMLAH HARGA BAHAN 1,921,890.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 2,375,040.00
D. OVERHEAD & KEUNTUNGAN 10 % 237,504.00
E. TOTAL HARGA SATUAN PEKERJAAN 2,612,544.00

MATA PEMBAYARAN : MEMASANG PIPA PVC TYPE AW DIA 1/2"


SATUAN PEKERJAAN : M1
NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN
SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.036 90,000.00 3,240.00


2 Tukang Batu Hari orang 0.060 120,000.00 7,200.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.002 150,000.00 270.00

JUMLAH HARGA TENAGA 11,610.00

B. BAHAN

1 Pipa PVC Dia 1/2" M' 1.200 10,000.00 12,000.00


2 Perlengkapan (35%) Ls 1.000 3,500.00 3,500.00

JUMLAH HARGA BAHAN 15,500.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 27,110.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,711.00
E. TOTAL HARGA SATUAN PEKERJAAN 29,821.00
MATA PEMBAYARAN : MEMASANG PIPA PVC TYPE AW DIA 3/4"
SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.036 90,000.00 3,240.00


2 Tukang Batu Hari orang 0.060 120,000.00 7,200.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.002 150,000.00 270.00

JUMLAH HARGA TENAGA 11,610.00

B. BAHAN

1 Pipa PVC Dia 3/4" M' 1.200 10,300.00 12,360.00


2 Perlengkapan (35%) Ls 1.000 3,605.00 3,605.00

JUMLAH HARGA BAHAN 15,965.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 27,575.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,757.50
E. TOTAL HARGA SATUAN PEKERJAAN 30,332.50

MATA PEMBAYARAN : MEMASANG PIPA PVC TYPE AW DIA 3"


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.036 90,000.00 3,240.00


2 Tukang Batu Hari orang 0.060 120,000.00 7,200.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.002 150,000.00 270.00

JUMLAH HARGA TENAGA 11,610.00

B. BAHAN

1 Pipa PVC Dia 3" M' 1.200 18,000.00 21,600.00


2 Perlengkapan (35%) Ls 1.000 6,300.00 6,300.00

JUMLAH HARGA BAHAN 27,900.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 39,510.00
D. OVERHEAD & KEUNTUNGAN 10 % 3,951.00
E. TOTAL HARGA SATUAN PEKERJAAN 43,461.00

MATA PEMBAYARAN : MEMASANG PIPA PVC TYPE AW DIA 4"


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.036 90,000.00 3,240.00


2 Tukang Batu Hari orang 0.060 120,000.00 7,200.00
3 Kepala Tukang Hari orang 0.006 150,000.00 900.00
4 Mandor Hari orang 0.002 150,000.00 270.00

JUMLAH HARGA TENAGA 11,610.00

B. BAHAN

1 Pipa PVC Dia 4" M' 1.200 52,000.00 62,400.00


2 Perlengkapan (35%) Ls 1.000 6,300.00 6,300.00

JUMLAH HARGA BAHAN 68,700.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 80,310.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,031.00
E. TOTAL HARGA SATUAN PEKERJAAN 88,341.00

MATA PEMBAYARAN : MEMASANG KRAN AIR DIA 1/2" ATAU 3/4"


SATUAN PEKERJAAN : BH

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)
A. TENAGA

1 Pekerja Hari orang 0.010 90,000.00 900.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 15,150.00

B. BAHAN

1 Kran Air Bh 1.000 75,000.00 75,000.00

JUMLAH HARGA BAHAN 75,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 90,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,015.00
E. TOTAL HARGA SATUAN PEKERJAAN 99,165.00
MATA PEMBAYARAN : MEMASANG FLOOR DRAIN
SATUAN PEKERJAAN : BH

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.010 90,000.00 900.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 15,150.00

B. BAHAN

1 Floor Drain Bh 1.000 64,000.00 64,000.00

JUMLAH HARGA BAHAN 64,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 79,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,915.00
E. TOTAL HARGA SATUAN PEKERJAAN 87,065.00

MATA PEMBAYARAN : MEMASANG Jet shower / toilet shower TOTO THX20


SATUAN PEKERJAAN : BH

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.010 90,000.00 900.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 15,150.00

B. BAHAN

1 Jetwasher toilet shower TOTO THX20 (Lengkap Accessories) Bh 1.000 225,000.00 225,000.00
2 Seal Tape Bh 1.000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 250,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 265,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,515.00
E. TOTAL HARGA SATUAN PEKERJAAN 291,665.00

MATA PEMBAYARAN : MEMASANG Shower mandi TOTO TX471KEA


SATUAN PEKERJAAN : BH

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.010 90,000.00 900.00


2 Tukang Batu Hari orang 0.100 120,000.00 12,000.00
3 Kepala Tukang Hari orang 0.010 150,000.00 1,500.00
4 Mandor Hari orang 0.005 150,000.00 750.00

JUMLAH HARGA TENAGA 15,150.00

B. BAHAN

1 Shower mandi TOTO TX471KEA (Lengkap Accessories) Bh 1.000 1,185,000.00 1,185,000.00


2 Seal Tape Bh 1.000 25,000.00 25,000.00

JUMLAH HARGA BAHAN 1,210,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,225,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 122,515.00
E. TOTAL HARGA SATUAN PEKERJAAN 1,347,665.00

MATA PEMBAYARAN : SEPTICTANK DAN RESAPAN


SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

1 Galian Tanah M3 7.366 78,375.00 577,271.06


2 Pasangan 1/2 Bata 1 : 4 M2 10.098 108,006.25 1,090,593.11
3 Plesteran 1 : 4 M2 10.098 69,036.00 697,091.01
4 Bekisting Plat Lantai M2 3.183 134,082.67 426,718.09
5 Pembesian(Besi Dia.10) Kg 23.519 16,021.50 376,817.27
6 Beton K-175 M3 0.318 1,117,994.60 355,801.78
7 Beton K-100 Lantai Kerja M3 0.318 913,470.18 290,711.88
8 Pipa PVC Dia 3" M1 9.000 43,461.00 391,149.00
9 Pipa T udara 2" Bh 1.000 150,000.00 150,000.00
10 Batu Pecah M3 0.300 462,753.00 138,825.90
11 Pasir Urug M3 0.675 189,750.00 128,081.25
12 Ijuk Kg 5.000 26,250.00 131,250.00
13 Kerikil M3 0.338 200,000.00 67,500.00
14 Tanah Urug M3 0.781 127,875.00 99,902.34

JUMLAH HARGA BAHAN 4,921,712.70

HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) 4,921,712.70

MATA PEMBAYARAN : PARIT KELILING


SATUAN PEKERJAAN : M1

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

1 Galian Tanah M3 0.228 78,375.00 17,830.31


2 Urugan Pasir M3 0.033 189,750.00 6,166.88
3 Cor Lantai Kerja K-100 M3 0.033 913,470.18 29,687.78
4 Pasangan 1/2 Bata 1 : 4 M2 0.800 108,006.25 86,405.00
5 Plesteran 1 : 4 M2 1.600 69,036.00 110,457.60

JUMLAH HARGA 250,547.57

HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) 250,547.57


MATA PEMBAYARAN : KUSEN PINTU DAN JENDELA KAYU
SATUAN PEKERJAAN : M3

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 7.000 90,000.00 630,000.00


2 Tukang Kayu Hari orang 21.000 120,000.00 2,520,000.00
3 Kepala Tukang Hari orang 2.100 150,000.00 315,000.00
4 Mandor Hari orang 0.350 150,000.00 52,500.00

JUMLAH HARGA TENAGA 3,517,500.00

B. BAHAN

1 Kayu Klas II M3 1.100 1,600,000.00 1,760,000.00


2 Paku 10 cm Kg 1.250 20,000.00 25,000.00
3 Lem Kayu Kg 1.000 27,300.00 27,300.00

JUMLAH HARGA BAHAN 1,812,300.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 5,329,800.00
D. OVERHEAD & KEUNTUNGAN 10 % 532,980.00
E. TOTAL HARGA SATUAN PEKERJAAN 5,862,780.00

MATA PEMBAYARAN : PINTU PANIL KAYU


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 1.000 90,000.00 90,000.00


2 Tukang Kayu Hari orang 3.000 120,000.00 360,000.00
3 Kepala Tukang Hari orang 0.300 150,000.00 45,000.00
4 Mandor Hari orang 0.050 150,000.00 7,500.00

JUMLAH HARGA TENAGA 502,500.00

B. BAHAN

1 Kayu Klas II M3 0.040 1,600,000.00 64,000.00


2 Lem Kayu Kg 0.500 27,300.00 13,650.00

JUMLAH HARGA BAHAN 77,650.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 580,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 58,015.00
E. TOTAL HARGA SATUAN PEKERJAAN 638,165.00

MATA PEMBAYARAN : PAPAN JALUSI


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.500 90,000.00 45,000.00


2 Tukang Kayu Hari orang 1.000 120,000.00 120,000.00
3 Kepala Tukang Hari orang 0.200 150,000.00 30,000.00
4 Mandor Hari orang 0.025 150,000.00 3,750.00

JUMLAH HARGA TENAGA 198,750.00

B. BAHAN

1 Kayu Klas III M3 0.060 1,600,000.00 96,000.00


2 Paku Kayu Kg 0.150 20,000.00 3,000.00

JUMLAH HARGA BAHAN 99,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 297,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 29,775.00
E. TOTAL HARGA SATUAN PEKERJAAN 327,525.00
MATA PEMBAYARAN : KACA BENING BINGKAI ( T = 5 MM )
SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.015 90,000.00 1,350.00


2 Tukang Kayu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.001 150,000.00 120.00

JUMLAH HARGA TENAGA 21,720.00

B. BAHAN

1 Kaca 5 MM M2 1.100 150,000.00 165,000.00


2 Paku Biasa Kg 0.150 20,000.00 3,000.00
3 Kayu Kelas III M3 0.020 1,600,000.00 32,000.00

JUMLAH HARGA BAHAN 200,000.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 221,720.00
D. OVERHEAD & KEUNTUNGAN 10 % 22,172.00
E. TOTAL HARGA SATUAN PEKERJAAN 243,892.00

MATA PEMBAYARAN : KACA BENING MATI ( T = 5 MM )


SATUAN PEKERJAAN : M2

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.015 90,000.00 1,350.00


2 Tukang Kayu Hari orang 0.150 120,000.00 18,000.00
3 Kepala Tukang Hari orang 0.015 150,000.00 2,250.00
4 Mandor Hari orang 0.001 150,000.00 120.00

JUMLAH HARGA TENAGA 21,720.00

B. BAHAN

1 Kaca 5 MM M2 1.100 150,000.00 165,000.00


2 Kayu list Profil M' 1.200 4,200.00 5,040.00

JUMLAH HARGA BAHAN 170,040.00

C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 191,760.00
D. OVERHEAD & KEUNTUNGAN 10 % 19,176.00
E. TOTAL HARGA SATUAN PEKERJAAN 210,936.00

MATA PEMBAYARAN : PINTU P1


SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. BAHAN

1 Volume kayu Kusen M3 #NAME? 5,862,780.00 #NAME?


2 Luas Pintu Panil M2 #NAME? 638,165.00 #NAME?
3 Luas Papan Jalusi M2 #NAME? 327,525.00 #NAME?
4 Luas Cat M2 #NAME? 44,506.00 #NAME?
5 Engsel Pintu Bh 6.000 14,700.00 88,200.00
6 Kunci 2 Slaag Bh 1.000 97,800.00 97,800.00

JUMLAH HARGA #NAME?

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) #NAME?


MATA PEMBAYARAN : PINTU P2
SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. BAHAN

1 Volume kayu Kusen M3 #NAME? 5,862,780.00 #NAME?


2 Luas Pintu Panil M2 #NAME? 638,165.00 #NAME?
3 Luas Papan Jalusi M2 #NAME? 327,525.00 #NAME?
4 Luas Cat M2 #NAME? 44,506.00 #NAME?
5 Engsel Pintu Bh 3.000 14,700.00 44,100.00
6 Kunci 2 Slaag Bh 1.000 97,800.00 97,800.00

JUMLAH HARGA #NAME?

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) #NAME?

MATA PEMBAYARAN : JENDELA J1


SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. BAHAN

1 Volume kayu Kusen M3 #NAME? 5,862,780.00 #NAME?


2 Luas Kaca Bingkai M2 #NAME? 243,892.00 #NAME?
3 Luas Kaca Mati M2 #NAME? 210,936.00 #NAME?
4 Luas Papan Jalusi M2 #NAME? 327,525.00 #NAME?
5 Luas Cat M2 #NAME? 44,506.00 #NAME?
6 Engsel jendela Bh 4.000 11,200.00 44,800.00
7 Hak angin Bh 4.000 17,325.00 69,300.00
8 Grendel Jendela Bh 4.000 10,500.00 42,000.00
9 Handle jendela Bh 2.000 28,875.00 57,750.00

JUMLAH HARGA #NAME?

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) #NAME?

MATA PEMBAYARAN : JENDELA J2


SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. BAHAN

1 Volume kayu Kusen M3 #NAME? 5,862,780.00 #NAME?


2 Luas Kaca Bingkai M2 #NAME? 243,892.00 #NAME?
3 Luas Kaca Mati M2 #NAME? 210,936.00 #NAME?
4 Luas Papan Jalusi M2 #NAME? 327,525.00 #NAME?
5 Luas Cat M2 #NAME? 44,506.00 #NAME?
6 Engsel jendela Bh 4.000 11,200.00 44,800.00
7 Hak angin Bh 4.000 17,325.00 69,300.00
8 Grendel Jendela Bh 4.000 10,500.00 42,000.00
9 Handle jendela Bh 2.000 28,875.00 57,750.00

JUMLAH HARGA #NAME?

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) #NAME?

MATA PEMBAYARAN : VENTILASI V1


SATUAN PEKERJAAN : UNIT

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


SATUAN HARGA
(Rp.) (Rp.)

A. BAHAN

1 Volume kayu Kusen M3 #NAME? 5,862,780.00 #NAME?


2 Luas Kaca Mati M2 #NAME? 243,892.00 #NAME?
3 Luas Cat M2 #NAME? 44,506.00 #NAME?

JUMLAH HARGA #NAME?

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) #NAME?

MATA PEMBAYARAN : 1 m2   Pekerjaan Pembongkaran Keramik         


SATUAN PEKERJAAN :
NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN
SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1 Pekerja Hari orang 0.050 90,000.00 4,500.00


2 Mandor Hari orang 0.010 150,000.00 1,500.00
JUMLAH HARGA 6,000.00

B. HARGA SATUAN PEKERJAAN (JUMLAH HARGA ) 6,000.00

MATA PEMBAYARAN : 1 bh    Pekerjaan Pembongkaran Kloset     


SATUAN PEKERJAAN :

NO. URAIAN SATUAN INDEKS HARGA JUMLAH KETERANGAN


RENCANA ANGGARAN BIAYA
PROYEK : RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME Hari:
KAVLING : D6 Tanggal:
HARGA SATUAN JUMLAH HARGA
N0 JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)

I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M2 136.00 18,150.00 2,468,400.00
2 Pek. Pas. Bowplank M1 50.00 10,571.00 528,550.00
2,996,950.00
II PEKERJAAN GALIAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi Setempat dan Rolak M3 23.59 78,375.00 1,848,866.25
2 Pek. Urugan Tanah M3 16.69 127,875.00 2,134,233.75
3 Pek. Urugan Pasir Bawah Pondasi Setempat dan Rolak M3 1.78 189,750.00 337,185.75
4 Pek. Cor Lantai Kerja K-100 Pondasi Setempat dan Rolak M3 0.51 913,470.18 467,696.73
5 Pek. Urugan Bekas Galian M3 16.72 26,125.00 436,888.38
5,224,870.86
III PEKERJAAN STRUKTUR
1 Pek. Pas. Cerocuk Btg 320.00 59,675.00 19,096,000.00
19,096,000.00
2 Pek. Pondasi (80 x 80)
a. Pek. Bekisting M2 20.48 43,134.67 883,397.97
b. Pek. Pembesian Kg 223.72 16,021.50 3,584,342.80
c. Pek. Cor Beton K-175 M3 3.07 1,117,994.60 3,434,479.42
7,902,220.19
3 Pek. Kolom Pendestal (12 x 12 cm)
a. Pek. Bekisting M2 3.07 95,949.33 294,756.35
b. Pek. Pembesian Kg 4.57 16,021.50 73,296.19
c. Pek. Cor Beton K-175 M3 0.92 1,117,994.60 1,030,343.83
1,398,396.37
4 Pek. Sloof (15 x 25)
a. Pek. Bekisting M2 40.48 46,068.00 1,864,832.64
b. Pek. Pembesian Kg 490.93 16,021.50 7,865,364.50
c. Pek. Cor Beton K-175 M3 3.80 1,117,994.60 4,242,789.52
13,972,986.66
5 Pek. Kolom Kp (12 x 12 cm)
a. Pek. Bekisting M2 13.82 46,068.00 636,844.03
b. Pek. Pembesian Kg 201.94 16,021.50 3,235,379.15
c. Pek. Cor Beton K-175 M3 #NAME? 1,117,994.60 #NAME?
#NAME?
6 Pek. Balok Letai 12 x 20 cm
a. Pek. Bekisting M2 0.84 95,949.33 80,597.44
b. Pek. Pembesian Kg 12.30 16,021.50 197,102.90
c. Pek. Cor Beton K-175 M3 0.09 1,117,994.60 100,619.51
378,319.86
7 Pek.Plate Liufel 10 x 50 cm
a. Pek. Bekisting M2 0.14 95,949.33 13,432.91
b. Pek. Pembesian Kg 0.37 16,021.50 5,868.68
c. Pek. Cor Beton K-175 M3 0.12 1,117,994.60 134,159.35
153,460.93
8 Pek. Ring Balok 12 x 20 cm
a. Pek. Bekisting M2 20.24 95,949.33 1,942,014.51
b. Pek. Pembesian Kg 333.48 16,021.50 5,342,772.92
c. Pek. Cor Beton K-175 M3 2.02 1,117,994.60 2,262,821.08
9,547,608.50
9 Pek. Plat Lantai Atap
a. Pek. Bekisting M2 35.25 95,949.33 3,382,214.00
b. Pek. Pembesian m2 217.49 16,021.50 3,484,556.09
c. Pek. Cor Beton K-175 M3 1.88 1,117,994.60 2,101,829.85
8,968,599.94
IV PEKERJAAN ARSITEKTUR
1 Pek. Dinding
a. Pek. Pas. dinding bata Camp. 1 : 4 M2 205.41 108,006.25 22,185,563.81
b. Pek. Pas. Keramik dinding KM 20 x 25 cm (Roman) M2 23.20 312,515.50 7,250,359.60
c. Pek. Pas. Keramik dinding Dapur 10 x 10 cm (Roman) M2 3.00 312,515.50 937,546.50
30,373,469.91
2 Pek. Plesteran dan Acian Dinding
HARGA SATUAN JUMLAH HARGA
N0 JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
a. Pek. Plesteran dan Acian dinding bata camp. 1 : 4 M2 359.02 110,698.50 39,742,975.47
b. Pek. Plesteran dan Acian dinding Pagar bata camp. 1 : 4 M2 12.00 110,698.50 1,328,382.00
41,071,357.47
3 Pek. Lantai
a. Pek. Urugan Pasir Bawah Lantai Bangunan M3 2.34 189,750.00 444,015.00
b. Pek. Cor Lantai Kerja K-100 Bawah Lantai Bangunan M3 3.33 913,470.18 3,039,572.01
c. Pek. Pas. Keramik Lantai 20 x 20 cm M2 5.25 284,528.75 1,493,775.94
d. Pek. Pas. Granit Lantai 80 x 80 cm M2 69.55 564,970.67 39,293,710.40
e Pek. Pas. Plint Granit Lantai 10 x 80 cm M' 66.55 67,275.13 4,477,159.90
f Pek. Pas. Granit Lantai 80 x 80 cm Teras, Balkon M2 3.20 564,970.67 1,807,906.16
g Pek. Pas. Plint Granit Lantai 10 x 80 cm Teras, Balkon M' 2.00 67,275.13 134,550.26
h Pek. Lantai Carport Koral Sikat M2 15.00 374,000.00 5,610,000.00
56,300,689.68
4 Pek. Atap Rangka Baja Ringan
a. Pek. Rangka Baja M2 95.69 145,000.00 13,874,325.00
b. Pek. Penutup Atap M2 95.69 100,000.00 9,568,500.00
c. Pek. Lisplank M' 41.24 61,633.00 2,541,744.92
25,984,569.92
5 Pek. Plafond
a. Pek. Plafond Gypsum M2 78.00 112,458.72 8,771,780.16
b. Pek. Plafond GRC M2 16.50 105,847.50 1,746,060.36
c. Pek. List plafond Gypsum M' 75.55 24,750.00 1,869,862.50
12,387,703.02
6 Pek. Pas. Kusen Kayu Kamper
a. Type P1 Kayu Kulim 6/12 Unit 1.00 600,000.00 600,000.00
b. Type P2 Kayu Kulim 6/12 Unit 4.00 500,000.00 2,000,000.00
c. Type P3 Kayu Kulim 6/12 Unit 3.00 400,000.00 1,200,000.00
3,800,000.00
7 Pek. Pas. Kusen Alumunium
a. Type P4 Alumunium M' 11.20 110,000.00 1,232,000.00
d. Type J1 Alumunium M' 12.08 110,000.00 1,328,800.00
e Type J2 Alumunium M' 10.40 110,000.00 1,144,000.00
f Type BV Alumunium M' 2.00 110,000.00 220,000.00
g Pek. Pas. Roster bh 50.00 12,000.00 600,000.00
4,524,800.00
8 Pek. Pas. Daun Pintu Panel kayu Kamper
a. Type P1 Kayu Kulim Panil swing Unit 2.00 700,000.00 1,400,000.00
b. Type P2 Kayu Kulim Panil Unit 4.00 600,000.00 2,400,000.00
c. Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi Unit 3.00 600,000.00 1,800,000.00
5,600,000.00
9 Pek. Pas. Daun Pintu Sliding Alumunium Panel kaca 5mm + Accesoris
a. Type P4 Alumunium Sliding Unit 4.00 700,000.00 2,800,000.00
2,800,000.00
10 Pek. Pas. Daun Jendela Alumunium Panel kaca 5mm + Accesoris
a. Type J1 Alumunium panil kaca 5mm Unit 2.00 500,000.00 1,000,000.00
b. Type J2 Alumunium panil kaca 5mm Unit 2.00 500,000.00 1,000,000.00
c. Type BV Alumunium panil kaca 5mm Unit 2.00 350,000.00 700,000.00
2,700,000.00
11 Pek. Pas. Profile GRC
a. Pek. Pas. Profile GRC tinggi 37cm M' 19.37 300,000.00 5,811,000.00
5,811,000.00
12 Pek. Pengecatan
a. Pek. Cat Air Dinding Exterior M2 86.76 34,518.83 2,994,853.26
b. Pek. Cat Air Dinding Interior M2 272.26 34,518.83 9,398,095.29
c. Pek. Cat Air Plafond Gypsum M2 72.75 34,518.83 2,511,244.52
d. Pek. Cat Coating Carport M2 15.00 28,150.00 422,250.00
e. Pek. Cat Kayu Duco M2 39.54 204,187.50 8,073,573.75
f. Pek. Cat Besi M2 10.20 44,506.00 453,961.20
RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME
KAVLING : D6
N0 JENIS PEKERJAAN SAT VOLUME

A CEROCOK Btg 320.00


B TAPAK FONDASI
1 Pek. Galian Tanah Pondasi Setempat dan Sloof M3 20.39
2 Pek. Urugan Pasir Bawah Pondasi Setempat dan Rolak M3 -
3 Pek. Cor Lantai Kerja K-100 Pondasi Setempat dan Rolak M3 -
4 Pek. Urugan Bekas Galian M3 #VALUE!
5 Pek. Pondasi (60x 60)
a. Pek. Bekisting M2 -
b. Pek. Pembesian Kg 223.72
c. Pek. Cor Beton Cam 1 : 2 : 3 M3 3.07
C SLOOF 15 x 20
a. Pek. Bekisting M2 40.48
b. Pek. Pembesian Kg 490.93
c. Pek. Cor Beton Cam 1 : 2 : 3 M3 3.80
D PEMIPAAN
a. Pek. Pas. Pipa PVC. dia. 2 1/2" + Accesoris M' 25.00
b. Pek. Pas. Pipa PVC. dia. 3" + Accesoris M' 28.50
c. Pek. Pas. Pipa PVC. dia. 4" + Accesoris M' 12.00
d. Pek. Pas. Pipa PVC. dia. 3/4" + Aksesoris M' 15.00
f. Pek. Pas. Pipa PVC. dia. 1/2" + Aksesoris M' 36.00
E TIMBUNAN M3 16.69
G KOLOM PRAKTIS (12 x 12)
a. Pek. Bekisting M2 6.91
b. Pek. Pembesian Kg 201.94
c. Pek. Cor Beton Cam 1 : 2 : 3 M3 0.92
H DINDING BATA DIPLASTER
a. Pasang Bata M2 205.41
b. Pek. Plesteran M2 317.22
J. ACIAN MORTAR M2 317.22
K. RING BALOK 12 x 20 cm
a. Pek. Bekisting M2 10.12
b. Pek. Pembesian Kg 333.48
c. Pek. Cor Beton K-175 M3 2.02
L. TALANG BETON
a. Pek. Bekisting M2 35.25
b. Pek. Pembesian m2 217.49
c. Pek. Cor Beton K-175 M3 1.04
M RELIEF
a. Pek. Pas. Profile GRC tinggi 37cm M' 12.50
N. SEPTIK TANK Unit 1.00
O. COR LANTAI M2 4.37
P TIANG PAGAR M' 4
Q TEMBOK PAGAR
a. Pasang Bata M2 33.00
b. Pek. Plesteran dan Acian dinding bata camp. 1 : 4 M2 33.00
R KUSEN PINTU KULIM / RESAK
1 Kusen Kayu Kulim
a. Type P1 Kayu Kulim 6/12 Unit 1.00
b. Type P2 Kayu Kulim 6/12 Unit 4.00
c. Type P3 Kayu Kulim 6/12 Unit 4.00
2 Daun Pintu Panel kayu Kulim
a. Type P1 Kayu Kulim Panil swing Unit 2.00
b. Type P2 Kayu Kulim Panil Unit 4.00
c. Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi Unit 4.00
Hari:
Tanggal:
HARGA SATUAN
JUMLAH HARGA (Rp) JUMLAH
(Rp)

59,675.00 19,096,000.00 Rp 19,096,000

78,375.00 1,598,066.25
189,750.00 -
913,470.18 -
26,125.00 #VALUE!

43,134.67 -
16,021.50 3,584,342.80
1,117,994.60 3,434,479.42 #VALUE!

46,068.00 1,864,832.64
16,021.50 7,865,364.50
1,117,994.60 4,242,789.52 Rp 13,972,987

35,000.00 875,000.00
43,461.00 1,238,638.50
88,341.00 1,060,092.00
30,332.50 454,987.50
29,821.00 1,073,556.00 Rp 4,702,274
127,875.00 2,134,233.75 Rp 2,134,234

46,068.00 318,422.02
16,021.50 3,235,379.15
1,117,994.60 1,030,343.83 Rp 4,584,145

108,006.25 22,185,563.81
69,036.00 21,899,599.92 Rp 44,085,164
41662.5 13,216,178.25 Rp 13,216,178

97,709.33 988,818.45
16,021.50 5,342,772.92
1,117,994.60 2,262,821.08 Rp 8,594,412

134,082.67 4,726,414.00
16,021.50 3,484,556.09
1,117,994.60 1,165,844.77 Rp 9,376,815

300,000.00 3,750,000.00 Rp 3,750,000


4,921,712.70 4,921,712.70 Rp 4,921,713
913,470.18 3,987,297.32 Rp 3,987,297
100,723.70 402,894.80 Rp 402,895

108,006.25 3,564,206.25
110,698.50 3,653,050.50 Rp 7,217,257

600,000.00 600,000.00
500,000.00 2,000,000.00
400,000.00 1,600,000.00

700,000.00 1,400,000.00
600,000.00 2,400,000.00
600,000.00 2,400,000.00 10,400,000.00

#VALUE! #VALUE!

#VALUE!
PROGRES
PROYEK : RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME
KAVLING : D6

NO JENIS PEKERJAAN SAT VOLUME

A CEROCOK Btg 320.00


B TAPAK FONDASI
1 Pek. Galian Tanah Pondasi Setempat dan Sloof M3 12.80
2 Pek. Urugan Bekas Galian M3 5.93
3 Pek. Pondasi (60x 60)
a. Pek. Pembesian Kg 223.72
b. Pek. Cor Beton Cam 1 : 2 : 3 M3 3.07
C SLOOF 15 x 20
a. Pek. Bekisting M2 40.48
b. Pek. Pembesian Kg 490.93
c. Pek. Cor Beton Cam 1 : 2 : 3 M3 3.80
D PEMIPAAN
a. Pek. Pas. Pipa PVC. dia. 2 1/2" + Accesoris M' 25.00
b. Pek. Pas. Pipa PVC. dia. 3" + Accesoris M' 28.50
c. Pek. Pas. Pipa PVC. dia. 4" + Accesoris M' 12.00
d. Pek. Pas. Pipa PVC. dia. 3/4" + Aksesoris M' 15.00
f. Pek. Pas. Pipa PVC. dia. 1/2" + Aksesoris M' 36.00
E TIMBUNAN M3 16.69
F KOLOM PRAKTIS (12 x 12)
a. Pek. Bekisting M2 6.91
b. Pek. Pembesian Kg 201.94
c. Pek. Cor Beton Cam 1 : 2 : 3 M3 0.92
G DINDING BATA DIPLASTER
a. Pasang Bata M2 205.41
b. Pek. Plesteran M2 317.22
H ACIAN MORTAR M2 317.22
I RING BALOK 12 x 20 cm
a. Pek. Bekisting M2 10.12
b. Pek. Pembesian Kg 333.48
c. Pek. Cor Beton K-175 M3 2.02
J TALANG BETON
a. Pek. Bekisting M2 35.25
b. Pek. Pembesian m2 217.49
c. Pek. Cor Beton K-175 M3 1.04
K RELIEF M' 12.50
L SEPTIK TANK Unit 1.00
M COR LANTAI M2 4.37
N TIANG PAGAR M' 4
O TEMBOK PAGAR
a. Pasang Bata M2 33.00
b. Pek. Plesteran dan Acian dinding bata camp. 1 : 4 M2 33.00
P KUSEN PINTU KULIM / RESAK
1 Kusen Kayu Kulim
a. Type P1 Kayu Kulim 6/12 Unit 1.00
b. Type P2 Kayu Kulim 6/12 Unit 4.00
c. Type P3 Kayu Kulim 6/12 Unit 4.00
2 Daun Pintu Panel kayu Kulim
a. Type P1 Kayu Kulim Panil swing Unit 2.00
b. Type P2 Kayu Kulim Panil Unit 4.00
c. Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi Unit 4.00
MINGGU LALU MINGGU INI SAMPAI MINGGU INI
BOBOT (%)
VOLUME BOBOT (%) VOLUME BOBOT (%) VOLUME BOBOT (%)

12.04% 12.04% 320.00 12.04% 320.00 12.04%

0.63% 9.60 0.47% 9.60 0.47%


0.10% 13.00 0.21% 13.00 0.21%

2.26% 162.20 1.64% 162.20 1.64%


2.17% 5.16% 2.30 1.62% 2.30 1.62%

1.18% 40.48 1.18% 40.48 1.18%


4.96% 413.25 4.17% 413.25 4.17%
2.67% 8.81% 3.20 2.25% 3.20 2.25%

0.55% - 0.00% - 0.00%


0.78% - 0.00% - 0.00%
0.67% - 0.00% - 0.00%
0.29% - 0.00% - 0.00%
0.68% - 0.00% - 0.00%
1.35% 4.31% - 0.00% - 0.00%

0.20% 3.46 0.10% 3.46 0.10%


2.04% 100.97 1.02% 100.97 1.02%
0.65% 2.89% 0.46 0.32% 0.46 0.32%

13.99% 166.01 11.30% 166.01 11.30%


13.81% 27.79% 20.62 0.90% 20.62 0.90%
8.33% 8.33% 17.36 0.46% 17.36 0.46%

0.62% 2.00 0.12% 2.00 0.12%


3.37% 39.54 0.40% 39.54 0.40%
1.43% 5.42% 0.29 0.20% 0.29 0.20%

2.98% - 0.00% - 0.00%


2.20% - 0.00% - 0.00%
0.73% 5.91% - 0.00% - 0.00%
2.36% 2.36% - 0.00% - 0.00%
3.10% 3.10% - 0.00% - 0.00%
2.51% 2.51% - 0.00% - 0.00%
0.25% 0.25% - 0.00% - 0.00%
- -
2.25% 5.40 0.37% 5.40 0.37%
2.30% 4.55% - 0.00% - 0.00%
0.38% 1.00 0.38% 1.00 0.38%
1.26% 4.00 1.26% 4.00 1.26%
1.01% 2.65% 4.00 1.01% 4.00 1.01%

0.88% - 0.00% - 0.00%


1.51% - 0.00% - 0.00%
1.51% 3.91% - 0.00% - 0.00%

100% 100% 41.43% 41.43%


Hari : Selasa
Tanggal : 28 Maret 2023
Bobot Sampai minggu ini: 41.43%
SISA PEKERJAAN BOBOT
TERHADAP
PEKERJAAN
VOLUME BOBOT (%) (%)

- 0.00% 100%

3.20 0.16% 75%


- 7.07 -0.12% 219%

61.52 0.62% 73%


0.77 0.54% 75%

- 0.00% 100%
77.67 0.78% 84%
0.60 0.42% 84%

25.00 0.55% 0%
28.50 0.78% 0%
12.00 0.67% 0%
15.00 0.29% 0%
36.00 0.68% 0%
16.69 1.35% 0%

3.46 0.10% 50%


100.97 1.02% 50%
0.46 0.32% 50%

39.40 2.68% 81%


296.60 12.91% 6%
299.87 7.88% 5%

8.12 0.50% 20%


293.94 2.97% 12%
1.74 1.22% 14%

35.25 2.98% 0%
217.49 2.20% 0%
1.04 0.73% 0%
12.50 2.36% 0%
1.00 3.10% 0%
4.37 2.51% 0%
4.00 0.25% 0%

27.60 1.88% 16%


33.00 2.30% 0%
- 0.00% 100%
- 0.00% 100%
- 0.00% 100%

2.00 0.88% 0%
4.00 1.51% 0%
4.00 1.51% 0%

58.57%

nilai kontrak Rp 145,000,000


Rp 60,080,348