PROYEK
1 Pekerja OH Rp 90,000.00
2 Tukang OH Rp 120,000.00
3 Kepala Tukang OH Rp 150,000.00
4 Mandor OH Rp 150,000.00
I. BAHAN BANGUNAN/PASANGAN
1 Batu Bata OVEN Bh Rp 420.00
2 Batu Pecah M3 Rp 462,753.00
3 Kerikil M3 Rp 200,000.00
4 Kerikil Kg Rp 148.15
5 Pasir Urug M3 Rp 120,000.00
6 Tanah Urug M3 Rp 75,000.00
7 Pasir Pasang M3 Rp 162,500.00
8 Pasir Cor/ Beton M3 Rp 187,000.00
9 Pasir Cor/ Beton Kg Rp 133.57
10 Sement Portland Type I (50 kg) Kg Rp 1,500.00
11 Semen Putih Kg Rp 2,350.00
12 Semen Warna Kg Rp 4,500.00
13 Air Liter Rp 350.00
14 Ijuk Kg Rp 26,250.00
BELUM DIKERJAKAN
Pek. Galian Pondasi
Tapak type Pondasi 0.800 0.800 0.800 0.800 4.000 3.20
Pek. Bekisting Plate Kanopi elv +2,30 0.500 3.500 0.080 1.000 0.140 1.000 0.14
Pek. Bekisting Balok Letai elv +2,30 0.120 3.500 1.000 2.000 0.840 1.000 0.84
sudah dikerjakan
Pek. Bekisting Balok Ringbalk elv +3,60
Sb. Vertikal 0.200 12.000 2.400 1.000 2.40
Sb. Herizontal 0.200 0.000 0.000 0.00
2.40
Pek. Bekisting Plate Atap elv + 3,40 1.500 23.500 1.000 35.250 1.000 35.25
Pek. Pembesian
Dimensi (M')
No KETERANGAN Jumlah Besi / 1 Item Jumlah Berat Total (Kg)
Panjang Diameter BJ BESI koefisien
Pek. Pondasi
Pondasi Type P1
Diameter 12
Tulangan Horizontal 1.860 0.012 0.887 1.650 5.000 16.000 131.99 149
Tulangan Vertikal 1.860 0.010 0.617 1.147 5.000 16.000 91.74 132
Over Lap 10 % 0.00
Grand Total (M2) 223.72
BELUM TERPASANG
Pek. Pondasi
Pondasi Type P1
Diameter 12
Tulangan Horizontal 1.860 0.012 0.887 1.650 5.000 4.000 33.00
Tulangan Vertikal 1.860 0.010 0.617 1.147 5.000 4.000 22.93
Over Lap 10 % 5.59
Grand Total (M2) 61.52
BELUM DIKERJAKAN
Pek. Pembesian Sloof
1 Sloof Type SL1
Diameter 12
Tulangan Utama 16.000 0.012 0.887 14.192 4.000 1.000 56.77
Over Lap 10 % 0.00
Diameter 6 56.77
Tulangan Begol 0.880 0.060 0.222 0.195 107.000 1.000 20.90
Over Lap 10 % 0.00
20.90
Grand Total (M2) 77.67
sudah dikerjakan
Pek. Pembesian Ringbalk
Diameter 10
Tulangan Utama 12.000 0.010 0.617 7.398 4.000 1.000 29.59
Over Lap 10 % 0.00
29.59
Diameter 6
Tulangan Begol 0.560 0.060 0.222 0.124 80.000 1.000 9.95
Over Lap 10 % 0.00
9.95
Grand Total (M2) 39.54
Lantai rumah
teras 1.600 2.000 3.200 0.00
Pek. Cor Beton Plate Kanopi elv +2,30 0.500 4.000 0.060 0.120 1.000 0.12
Pek. Cor Beton Balok Letai elv +2,30 0.100 0.200 4.500 0.090 1.000 0.09
Pek. Cor Beton Balok Ringbalk elv +3,60 0.100 0.200 101.200 2.024 1.000 2.02
BELUM DIKERJAKAN
Pek. Cor Beton Balok Ringbalk elv +3,60 0.120 0.200 12.000 0.288 1.000 0.29
Pek. Cor Beton Plate Atap elv + 3,60 23.500 0.080 1.880 1.000 1.88
ARSITEKTUR
Pek.Pas Diding Bata 1 : 4
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Lebar Tinggi
Bangunan rumah
Sb. Vertikal 3.400 33.650 114.410 1.000 114.41
Sb. Herizontal 3.400 34.500 117.300 1.000 117.30
231.71
dikurang pintu 2.250 9.200 20.700 1.000 20.70
jendela 1.400 4.000 5.600 1.000 5.60
26.30
jumlah 205.41
BELUM DIKERJAKAN
Bangunan rumah
Sb. Vertikal 1.000 26.500 26.500 1.000 26.50
Sb. Herizontal 1.000 34.500 34.500 0.000 0.00
26.50
3.50
2.000
7.400
39.40
Pagar Belakang
Sb. Vertikal 2.800 3.500 9.800 1.000 9.80
Sb. Herizontal 2.800 4.000 11.200 1.000 11.20
jumlah 21.00
Pagar Depan
Sb. Vertikal 1.200 5.500 6.600 1.000 6.60
Sb. Herizontal 1.200 4.500 5.400 1.000 5.40
jumlah 12.00
Atap
Sb. Vertikal 0.200 23.000 4.600 1.000 4.60
Sb. Herizontal 0.200 14.000 2.800 1.000 2.80
jumlah 7.40
Pek.Plasteran dan aci 1 : 4
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Tinggi Panjang Lebar kurang
rumah
Sb. Vertikal 3.400 33.650 2.000 66.300 162.520 1.000 162.52
Sb. Herizontal 3.400 34.500 2.000 11.900 222.700 1.000 222.70
385.22
dikurang pintu 2.250 10.400 23.400 1.000 23.40
jendela 1.400 2.000 2.800 1.000 2.80
26.20
jumlah 359.02
Pagar Belakang
Sb. Vertikal 2.800 3.500 9.800 1.000 9.80
Sb. Herizontal 2.800 4.000 11.200 1.000 11.20
21.00
Pagar Depan
Sb. Vertikal 1.200 5.500 6.600 1.000 6.60
Sb. Herizontal 1.200 4.500 5.400 1.000 5.40
jumlah 12.00
Atap
Sb. Vertikal 0.200 23.000 4.600 1.000 4.60
Sb. Herizontal 0.200 14.000 2.800 1.000 2.80
jumlah 7.40
Pek. Penutup Lantai (Keramik)
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Lebar Panjang Tinggi Tinggi
Lantai rumah
Granit Teras 80 x 80 Warna Gelap 1.600 2.000 3.200 1.000 3.20
Granit Ruang Tamu 80 x 80 Warna Terang 2.500 5.000 0.650 2.000 13.800 1.000 13.80
Granit Ruang Keluarga, R. Makan 80 x 80 Warna Terang 4.500 5.000 1.500 2.000 25.500 1.000 25.50
Granit Dapur 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Kamar utama dan K. anak 3.500 3.500 3.000 3.000 21.250 1.000 21.25
69.55
Plint Granit 10 x 80 Warna Terang
R. Tamu 16.050
R.Makan,R. Keluarga 21.500
Dapur 11.000
K. Tidur Anak 13.000
K. Tidur Utama 14.000 75.55
Dikurang lebar Pintu 9.000 9.00
jumlah 66.55 m'
Lantai 1
Plafond Teras Depan 1.500 2.000 3.000 1.000 3.00
3.00
Plafond Teras Belakang 1.000 4.000 4.000 1.000 4.00
4.00
Plafond Ruang Tamu 3.000 5.000 1.000 2.000 17.000 1.000 17.00
Plafond Ruang Keluarga 4.000 4.000 16.000 1.000 16.00
Plafond Ruang Makan 4.000 4.000 16.000 1.000 16.00
Plafond Kamar Tidur Tamu 3.000 3.000 9.000 1.000 9.00
Plafond Dapur 3.000 4.000 12.000 1.000 12.00
70.00
Plafond Ruang Area Cuci Jemur 1.500 2.250 plint 0.610 3.985 1.000 3.99
Plafond KM A 1.500 1.750 2.625 1.000 2.63
6.61
jumlah 83.61
Pek. List plafond Gypsum
List Plafond Lantai 1
Vertikal 41.000
Herizontal 39.000 80.000 1.000 80.00
Jumlah 80.00
List Plafond Lantai 2
Vertikal 35.000
Herizontal 55.000 90.000 1.000 90.00
Jumlah 90.00
Grand Total (M') 170.00
Pek. Kusen Pintu Dan Jendela
Dimensi (M')
No KETERANGAN Vol (M') Jumlah Vol Total (M3)
Lebar Tinggi
Type P1 Kayu Kulim Panil swing 1.400 2.200 3.080 2.000 6.16
Type P2 Kayu Kulim Panil 0.800 2.200 1.760 4.000 7.04
Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi 0.700 2.200 1.540 4.000 6.16
19.36
Grand Total (M') 19.36
Pagar
Sb. Vertikal 3.000 12.500 13.700 23.800 1.000 23.80
Sb. Herizontal 3.000 4.000 4.000 8.000 1.000 8.00
jumlah 31.80
Atap
Sb. Vertikal 0.820 18.000 14.760 1.000 14.76
Sb. Herizontal 0.820 10.000 8.200 1.000 8.20
jumlah 22.96
Grand Total (M2) 774.86
Pek. Penutup Lantai (Granit & Keramik)
Dimensi (M')
No KETERANGAN Vol (M2) Jumlah Vol Total (M2)
Lebar Panjang Tinggi Tinggi
Lantai 1
Granit Teras 80 x 80 Warna Gelap 1.500 2.000 3.000 1.000 3.00
Plint Granit 10 x 80 Warna Gelap 0.100 2.000 0.200 1.000 0.20
Jumlah 3.20
Granit Teras Belakang 80 x 80 Warna Gelap 1.000 4.000 4.000 1.000 4.00
Plint Granit 10 x 80 Warna Gelap 0.100 6.000 0.600 1.000 0.60
Jumlah 4.60
Granit Ruang Tamu 80 x 80 Warna Terang 3.000 5.000 1.000 2.000 17.000 1.000 17.00
Granit Ruang Keluarga 80 x 80 Warna Terang 4.000 4.000 16.000 1.000 16.00
Granit Ruang Makan 80 x 80 Warna Terang 4.000 4.000 16.000 1.000 16.00
Granit Kamar Tidur Tamu 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Dapur 80 x 80 Warna Terang 3.000 4.000 12.000 1.000 12.00
Plint Granit 10 x 80 Warna Terang 0.100 55.000 plint 0.990 4.510 1.000 4.51
Jumlah 74.51
Keramik Ruang Area Cuci Jemur 20 x 20 Warna gelap + Plint 1.500 2.250 plint 0.610 3.985 1.000 3.99
Keramik KM A 20 x 20 Warna Gelap 1.500 1.750 2.625 1.000 2.63
Jumlah 6.61
Keramik Dinding KM 1 - PJ 6.500 2.000 pj 4.525 8.475 1.000 8.48
Keramik Dinding Dapur 10 x 10 5.000 1.000 5.000 1.000 5.00
Jumlah 13.48
Meja Dapur Granit 70 x 5 5.000 0.700 3.500 1.000 3.50
Jumlah 3.50
Lantai 2
Granit Balkon 80 x 80 Warna Gelap 2.000 3.500 7.000 1.000 7.00
Plint Granit 10 x 80 Warna Gelap 18.000 0.100 1.800 1.000 1.80
8.80
Granit Kamar Tidur Utama 80 x 80 Warna Terang 3.000 3.500 1.500 1.000 12.000 1.000 12.00
Granit Kamar Tidur Anak A 80 x 80 Warna Terang 3.000 3.000 9.000 1.000 9.00
Granit Kamar Tidur Anak B 80 x 80 Warna Terang 3.500 3.000 10.500 1.000 10.50
Granit Ruang Santai 80 x 80 Warna Terang 3.500 4.000 14.000 1.000 14.00
Plint Granit 10 x 80 Warna Terang 0.100 49.900 pj 0.680 4.310 1.000 4.31
Jumlah 49.81
Keramik KM B 20 x 20 1.500 1.800 2.700 1.000 2.70
Keramik KM Utama 20 x 20 1.500 2.000 3.000 1.000 3.00
Jumlah 5.70
Keramik Dinding KM B 20 x 40 2.000 6.600 pj 1.575 11.625 1.000 11.63
Keramik Dinding KM Utama 20 x 40 2.000 7.000 pj 1.575 12.425 1.000 12.43
Jumlah 24.05
Keramik Tangga + Plint 1.000 5.000 1.000 3.400 8.400 1.000 8.40
Jumlah 8.40
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 48,050.00
D. OVERHEAD & KEUNTUNGAN 10 % 4,805.00
E. TOTAL HARGA SATUAN PEKERJAAN 52,855.00
UNTUK 5 X PEMAKAIAN 10,571.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 16,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,650.00
E. TOTAL HARGA SATUAN PEKERJAAN 18,150.00
A. TENAGA
B. BAHAN
N/A
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 71,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,125.00
E. TOTAL HARGA SATUAN PEKERJAAN 78,375.00
MATA PEMBAYARAN : GALIAN TANAH BIASA SEDALAM 2 M
SATUAN PEKERJAAN : M3
A. TENAGA
B. BAHAN
N/A
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 87,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,775.00
E. TOTAL HARGA SATUAN PEKERJAAN 96,525.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 172,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 17,250.00
E. TOTAL HARGA SATUAN PEKERJAAN 189,750.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 116,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 11,625.00
E. TOTAL HARGA SATUAN PEKERJAAN 127,875.00
MATA PEMBAYARAN : BEKISTING PONDASI / PILE CAP
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 117,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 11,764.00
E. TOTAL HARGA SATUAN PEKERJAAN 129,404.00
F. UNTUK 3 X PEMAKAIAN 43,134.67
A. TENAGA
1 Pekerja Hari orang 0.260 90,000.00 23,400.00
2 Tukang Kayu Hari orang 0.130 120,000.00 15,600.00
3 Kepala Tukang Hari orang 0.026 150,000.00 3,900.00
4 Mandor Hari orang 0.026 150,000.00 3,900.00
B. BAHAN
1 Kayu Kelas III m3 0.045 1,600,000.00 72,000.00
2 Paku Biasa 2" - 5" Kg 0.300 20,000.00 6,000.00
3 Minyak Bekisting Ltr 0.100 8,400.00 840.00
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 125,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 12,564.00
E. TOTAL HARGA SATUAN PEKERJAAN 138,204.00
F. UNTUK 3 X PEMAKAIAN 46,068.00
A. TENAGA
1 Pekerja Hari orang 0.200 90,000.00 18,000.00
2 Tukang Kayu Hari orang 0.300 120,000.00 36,000.00
3 Kepala Tukang Hari orang 0.030 150,000.00 4,500.00
4 Mandor Hari orang 0.030 150,000.00 4,500.00
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 261,680.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,168.00
E. TOTAL HARGA SATUAN PEKERJAAN 287,848.00
F. UNTUK 3 X PEMAKAIAN 95,949.33
MATA PEMBAYARAN : BEKISTING BALOK
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 266,480.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,648.00
E. TOTAL HARGA SATUAN PEKERJAAN 293,128.00
F. UNTUK 3 X PEMAKAIAN 97,709.33
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 365,680.00
D. OVERHEAD & KEUNTUNGAN 10 % 36,568.00
E. TOTAL HARGA SATUAN PEKERJAAN 402,248.00
F. UNTUK 3 X PEMAKAIAN 134,082.67
MATA PEMBAYARAN : BEKISTING DINDING
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 370,180.00
D. OVERHEAD & KEUNTUNGAN 10 % 37,018.00
E. TOTAL HARGA SATUAN PEKERJAAN 407,198.00
F. UNTUK 3 X PEMAKAIAN 135,732.67
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 236,710.00
D. OVERHEAD & KEUNTUNGAN 10 % 23,671.00
E. TOTAL HARGA SATUAN PEKERJAAN 260,381.00
F. UNTUK 3 X PEMAKAIAN 86,793.67
MATA PEMBAYARAN : PASANG KAYU CERUCUK
SATUAN PEKERJAAN : BTG
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 54,250.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,425.00
E. TOTAL HARGA SATUAN PEKERJAAN 59,675.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 830,427.43
D. OVERHEAD & KEUNTUNGAN 10 % 83,042.74
E. TOTAL HARGA SATUAN PEKERJAAN 913,470.18
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,016,358.73
D. OVERHEAD & KEUNTUNGAN 10 % 101,635.87
E. TOTAL HARGA SATUAN PEKERJAAN 1,117,994.60
MATA PEMBAYARAN : Beton Mutu Fc=21,7 MPa (K250), Slump (12+/-2) cm, w/c = 0,56
SATUAN PEKERJAAN : M3
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,249,192.57
D. OVERHEAD & KEUNTUNGAN 10 % 124,919.26
E. TOTAL HARGA SATUAN PEKERJAAN 1,374,111.82
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 14,565.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,456.50
E. TOTAL HARGA SATUAN PEKERJAAN 16,021.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 222,550.00
D. OVERHEAD & KEUNTUNGAN 10 % 22,255.00
E. TOTAL HARGA SATUAN PEKERJAAN 244,805.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 106,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 10,675.00
E. TOTAL HARGA SATUAN PEKERJAAN 117,425.00
MATA PEMBAYARAN : PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC: 4 PS
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 98,187.50
D. OVERHEAD & KEUNTUNGAN 10 % 9,818.75
E. TOTAL HARGA SATUAN PEKERJAAN 108,006.25
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 91,567.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,156.70
E. TOTAL HARGA SATUAN PEKERJAAN 100,723.70
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 62,760.00
D. OVERHEAD & KEUNTUNGAN 10 % 6,276.00
E. TOTAL HARGA SATUAN PEKERJAAN 69,036.00
MATA PEMBAYARAN : PLESTER 1 PC : 2 PS, TEBAL 1,5 CM
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 68,086.00
D. OVERHEAD & KEUNTUNGAN 10 % 6,808.60
E. TOTAL HARGA SATUAN PEKERJAAN 74,894.60
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 37,875.00
D. OVERHEAD & KEUNTUNGAN 10 % 3,787.50
E. TOTAL HARGA SATUAN PEKERJAAN 41,662.50
A. TENAGA
B. BAHAN
C. ALAT
D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 12,050.00
E. OVERHEAD & KEUNTUNGAN 10 % 1,205.00
F. TOTAL HARGA SATUAN PEKERJAAN 13,255.00
MATA PEMBAYARAN : CAT MINYAK
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. ALAT
D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 40,460.00
E. OVERHEAD & KEUNTUNGAN 10 % 4,046.00
F. TOTAL HARGA SATUAN PEKERJAAN 44,506.00
MATA PEMBAYARAN : 1 m2. Lapis melamin duco (2x lapis sampai rata)
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 185,625.00
E. OVERHEAD & KEUNTUNGAN 10 % 18,562.50
F. TOTAL HARGA SATUAN PEKERJAAN 204,187.50
A. TENAGA
B. BAHAN
C. ALAT
D. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B+C) 31,380.75
E. OVERHEAD & KEUNTUNGAN 10 % 3,138.08
F. TOTAL HARGA SATUAN PEKERJAAN 34,518.83
MATA PEMBAYARAN : LANTAI KERAMIK 40 X 40 CM
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 241,162.50
D. OVERHEAD & KEUNTUNGAN 10 % 24,116.25
E. TOTAL HARGA SATUAN PEKERJAAN 265,278.75
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 204,162.50
D. OVERHEAD & KEUNTUNGAN 10 % 20,416.25
E. TOTAL HARGA SATUAN PEKERJAAN 224,578.75
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 513,609.70
D. OVERHEAD & KEUNTUNGAN 10 % 51,360.97
E. TOTAL HARGA SATUAN PEKERJAAN 564,970.67
MATA PEMBAYARAN : LANTAI KERAMIK 20 X 20 CM
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 258,662.50
D. OVERHEAD & KEUNTUNGAN 10 % 25,866.25
E. TOTAL HARGA SATUAN PEKERJAAN 284,528.75
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 258,662.50
D. OVERHEAD & KEUNTUNGAN 10 % 25,866.25
E. TOTAL HARGA SATUAN PEKERJAAN 284,528.75
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 284,105.00
D. OVERHEAD & KEUNTUNGAN 10 % 28,410.50
E. TOTAL HARGA SATUAN PEKERJAAN 312,515.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 52,068.30
D. OVERHEAD & KEUNTUNGAN 10 % 5,206.83
E. TOTAL HARGA SATUAN PEKERJAAN 57,275.13
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 50,122.50
D. OVERHEAD & KEUNTUNGAN 10 % 5,012.25
E. TOTAL HARGA SATUAN PEKERJAAN 55,134.75
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 93,890.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,389.00
E. TOTAL HARGA SATUAN PEKERJAAN 103,279.00
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 56,030.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,603.00
E. TOTAL HARGA SATUAN PEKERJAAN 61,633.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 102,235.20
D. OVERHEAD & KEUNTUNGAN 10 % 10,223.52
E. TOTAL HARGA SATUAN PEKERJAAN 112,458.72
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 96,225.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,622.50
E. TOTAL HARGA SATUAN PEKERJAAN 105,847.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 44,730.00
D. OVERHEAD & KEUNTUNGAN 10 % 4,473.00
E. TOTAL HARGA SATUAN PEKERJAAN 49,203.00
MATA PEMBAYARAN : PLAFOND PIRI-PIRI 2/10 CM
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 96,900.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,690.00
E. TOTAL HARGA SATUAN PEKERJAAN 106,590.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 19,200.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,920.00
E. TOTAL HARGA SATUAN PEKERJAAN 21,120.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 22,500.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,250.00
E. TOTAL HARGA SATUAN PEKERJAAN 24,750.00
MATA PEMBAYARAN : LIST PROFIL KAYU
SATUAN PEKERJAAN : M1
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 16,310.00
D. OVERHEAD & KEUNTUNGAN 10 % 1,631.00
E. TOTAL HARGA SATUAN PEKERJAAN 17,941.00
MATA PEMBAYARAN : KUDA-KUDA BAJA RINGAN
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 256,108.00
D. OVERHEAD & KEUNTUNGAN 10 % 25,610.80
E. TOTAL HARGA SATUAN PEKERJAAN 281,718.80
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 88,485.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,848.50
E. TOTAL HARGA SATUAN PEKERJAAN 97,333.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 72,640.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,264.00
E. TOTAL HARGA SATUAN PEKERJAAN 79,904.00
MATA PEMBAYARAN : BOLA-BOLA ATAP
SATUAN PEKERJAAN : M1
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN, A+B) 51,390.00
D. OVERHEAD & KEUNTUNGAN 10 % 5,139.00
E. TOTAL HARGA SATUAN PEKERJAAN 56,529.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 655,525.00
D. OVERHEAD & KEUNTUNGAN 10 % 65,552.50
E. TOTAL HARGA SATUAN PEKERJAAN 721,077.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 2,375,040.00
D. OVERHEAD & KEUNTUNGAN 10 % 237,504.00
E. TOTAL HARGA SATUAN PEKERJAAN 2,612,544.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 27,110.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,711.00
E. TOTAL HARGA SATUAN PEKERJAAN 29,821.00
MATA PEMBAYARAN : MEMASANG PIPA PVC TYPE AW DIA 3/4"
SATUAN PEKERJAAN : M1
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 27,575.00
D. OVERHEAD & KEUNTUNGAN 10 % 2,757.50
E. TOTAL HARGA SATUAN PEKERJAAN 30,332.50
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 39,510.00
D. OVERHEAD & KEUNTUNGAN 10 % 3,951.00
E. TOTAL HARGA SATUAN PEKERJAAN 43,461.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 80,310.00
D. OVERHEAD & KEUNTUNGAN 10 % 8,031.00
E. TOTAL HARGA SATUAN PEKERJAAN 88,341.00
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 90,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 9,015.00
E. TOTAL HARGA SATUAN PEKERJAAN 99,165.00
MATA PEMBAYARAN : MEMASANG FLOOR DRAIN
SATUAN PEKERJAAN : BH
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 79,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 7,915.00
E. TOTAL HARGA SATUAN PEKERJAAN 87,065.00
A. TENAGA
B. BAHAN
1 Jetwasher toilet shower TOTO THX20 (Lengkap Accessories) Bh 1.000 225,000.00 225,000.00
2 Seal Tape Bh 1.000 25,000.00 25,000.00
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 265,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 26,515.00
E. TOTAL HARGA SATUAN PEKERJAAN 291,665.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 1,225,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 122,515.00
E. TOTAL HARGA SATUAN PEKERJAAN 1,347,665.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 5,329,800.00
D. OVERHEAD & KEUNTUNGAN 10 % 532,980.00
E. TOTAL HARGA SATUAN PEKERJAAN 5,862,780.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 580,150.00
D. OVERHEAD & KEUNTUNGAN 10 % 58,015.00
E. TOTAL HARGA SATUAN PEKERJAAN 638,165.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 297,750.00
D. OVERHEAD & KEUNTUNGAN 10 % 29,775.00
E. TOTAL HARGA SATUAN PEKERJAAN 327,525.00
MATA PEMBAYARAN : KACA BENING BINGKAI ( T = 5 MM )
SATUAN PEKERJAAN : M2
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 221,720.00
D. OVERHEAD & KEUNTUNGAN 10 % 22,172.00
E. TOTAL HARGA SATUAN PEKERJAAN 243,892.00
A. TENAGA
B. BAHAN
C. HARGA SATUAN PEKERJAAN (JUMLAH HARGA TENAGA DAN BAHAN, A+B) 191,760.00
D. OVERHEAD & KEUNTUNGAN 10 % 19,176.00
E. TOTAL HARGA SATUAN PEKERJAAN 210,936.00
A. BAHAN
A. BAHAN
A. BAHAN
A. BAHAN
A. BAHAN
A. TENAGA
I PEKERJAAN PENDAHULUAN
1 Pek. Pembersihan Lokasi M2 136.00 18,150.00 2,468,400.00
2 Pek. Pas. Bowplank M1 50.00 10,571.00 528,550.00
2,996,950.00
II PEKERJAAN GALIAN TANAH DAN PONDASI
1 Pek. Galian Tanah Pondasi Setempat dan Rolak M3 23.59 78,375.00 1,848,866.25
2 Pek. Urugan Tanah M3 16.69 127,875.00 2,134,233.75
3 Pek. Urugan Pasir Bawah Pondasi Setempat dan Rolak M3 1.78 189,750.00 337,185.75
4 Pek. Cor Lantai Kerja K-100 Pondasi Setempat dan Rolak M3 0.51 913,470.18 467,696.73
5 Pek. Urugan Bekas Galian M3 16.72 26,125.00 436,888.38
5,224,870.86
III PEKERJAAN STRUKTUR
1 Pek. Pas. Cerocuk Btg 320.00 59,675.00 19,096,000.00
19,096,000.00
2 Pek. Pondasi (80 x 80)
a. Pek. Bekisting M2 20.48 43,134.67 883,397.97
b. Pek. Pembesian Kg 223.72 16,021.50 3,584,342.80
c. Pek. Cor Beton K-175 M3 3.07 1,117,994.60 3,434,479.42
7,902,220.19
3 Pek. Kolom Pendestal (12 x 12 cm)
a. Pek. Bekisting M2 3.07 95,949.33 294,756.35
b. Pek. Pembesian Kg 4.57 16,021.50 73,296.19
c. Pek. Cor Beton K-175 M3 0.92 1,117,994.60 1,030,343.83
1,398,396.37
4 Pek. Sloof (15 x 25)
a. Pek. Bekisting M2 40.48 46,068.00 1,864,832.64
b. Pek. Pembesian Kg 490.93 16,021.50 7,865,364.50
c. Pek. Cor Beton K-175 M3 3.80 1,117,994.60 4,242,789.52
13,972,986.66
5 Pek. Kolom Kp (12 x 12 cm)
a. Pek. Bekisting M2 13.82 46,068.00 636,844.03
b. Pek. Pembesian Kg 201.94 16,021.50 3,235,379.15
c. Pek. Cor Beton K-175 M3 #NAME? 1,117,994.60 #NAME?
#NAME?
6 Pek. Balok Letai 12 x 20 cm
a. Pek. Bekisting M2 0.84 95,949.33 80,597.44
b. Pek. Pembesian Kg 12.30 16,021.50 197,102.90
c. Pek. Cor Beton K-175 M3 0.09 1,117,994.60 100,619.51
378,319.86
7 Pek.Plate Liufel 10 x 50 cm
a. Pek. Bekisting M2 0.14 95,949.33 13,432.91
b. Pek. Pembesian Kg 0.37 16,021.50 5,868.68
c. Pek. Cor Beton K-175 M3 0.12 1,117,994.60 134,159.35
153,460.93
8 Pek. Ring Balok 12 x 20 cm
a. Pek. Bekisting M2 20.24 95,949.33 1,942,014.51
b. Pek. Pembesian Kg 333.48 16,021.50 5,342,772.92
c. Pek. Cor Beton K-175 M3 2.02 1,117,994.60 2,262,821.08
9,547,608.50
9 Pek. Plat Lantai Atap
a. Pek. Bekisting M2 35.25 95,949.33 3,382,214.00
b. Pek. Pembesian m2 217.49 16,021.50 3,484,556.09
c. Pek. Cor Beton K-175 M3 1.88 1,117,994.60 2,101,829.85
8,968,599.94
IV PEKERJAAN ARSITEKTUR
1 Pek. Dinding
a. Pek. Pas. dinding bata Camp. 1 : 4 M2 205.41 108,006.25 22,185,563.81
b. Pek. Pas. Keramik dinding KM 20 x 25 cm (Roman) M2 23.20 312,515.50 7,250,359.60
c. Pek. Pas. Keramik dinding Dapur 10 x 10 cm (Roman) M2 3.00 312,515.50 937,546.50
30,373,469.91
2 Pek. Plesteran dan Acian Dinding
HARGA SATUAN JUMLAH HARGA
N0 JENIS PEKERJAAN SAT VOLUME
(Rp) (Rp)
a. Pek. Plesteran dan Acian dinding bata camp. 1 : 4 M2 359.02 110,698.50 39,742,975.47
b. Pek. Plesteran dan Acian dinding Pagar bata camp. 1 : 4 M2 12.00 110,698.50 1,328,382.00
41,071,357.47
3 Pek. Lantai
a. Pek. Urugan Pasir Bawah Lantai Bangunan M3 2.34 189,750.00 444,015.00
b. Pek. Cor Lantai Kerja K-100 Bawah Lantai Bangunan M3 3.33 913,470.18 3,039,572.01
c. Pek. Pas. Keramik Lantai 20 x 20 cm M2 5.25 284,528.75 1,493,775.94
d. Pek. Pas. Granit Lantai 80 x 80 cm M2 69.55 564,970.67 39,293,710.40
e Pek. Pas. Plint Granit Lantai 10 x 80 cm M' 66.55 67,275.13 4,477,159.90
f Pek. Pas. Granit Lantai 80 x 80 cm Teras, Balkon M2 3.20 564,970.67 1,807,906.16
g Pek. Pas. Plint Granit Lantai 10 x 80 cm Teras, Balkon M' 2.00 67,275.13 134,550.26
h Pek. Lantai Carport Koral Sikat M2 15.00 374,000.00 5,610,000.00
56,300,689.68
4 Pek. Atap Rangka Baja Ringan
a. Pek. Rangka Baja M2 95.69 145,000.00 13,874,325.00
b. Pek. Penutup Atap M2 95.69 100,000.00 9,568,500.00
c. Pek. Lisplank M' 41.24 61,633.00 2,541,744.92
25,984,569.92
5 Pek. Plafond
a. Pek. Plafond Gypsum M2 78.00 112,458.72 8,771,780.16
b. Pek. Plafond GRC M2 16.50 105,847.50 1,746,060.36
c. Pek. List plafond Gypsum M' 75.55 24,750.00 1,869,862.50
12,387,703.02
6 Pek. Pas. Kusen Kayu Kamper
a. Type P1 Kayu Kulim 6/12 Unit 1.00 600,000.00 600,000.00
b. Type P2 Kayu Kulim 6/12 Unit 4.00 500,000.00 2,000,000.00
c. Type P3 Kayu Kulim 6/12 Unit 3.00 400,000.00 1,200,000.00
3,800,000.00
7 Pek. Pas. Kusen Alumunium
a. Type P4 Alumunium M' 11.20 110,000.00 1,232,000.00
d. Type J1 Alumunium M' 12.08 110,000.00 1,328,800.00
e Type J2 Alumunium M' 10.40 110,000.00 1,144,000.00
f Type BV Alumunium M' 2.00 110,000.00 220,000.00
g Pek. Pas. Roster bh 50.00 12,000.00 600,000.00
4,524,800.00
8 Pek. Pas. Daun Pintu Panel kayu Kamper
a. Type P1 Kayu Kulim Panil swing Unit 2.00 700,000.00 1,400,000.00
b. Type P2 Kayu Kulim Panil Unit 4.00 600,000.00 2,400,000.00
c. Type P3 Kayu Kulim Panil lapis Alumunium 1 sisi Unit 3.00 600,000.00 1,800,000.00
5,600,000.00
9 Pek. Pas. Daun Pintu Sliding Alumunium Panel kaca 5mm + Accesoris
a. Type P4 Alumunium Sliding Unit 4.00 700,000.00 2,800,000.00
2,800,000.00
10 Pek. Pas. Daun Jendela Alumunium Panel kaca 5mm + Accesoris
a. Type J1 Alumunium panil kaca 5mm Unit 2.00 500,000.00 1,000,000.00
b. Type J2 Alumunium panil kaca 5mm Unit 2.00 500,000.00 1,000,000.00
c. Type BV Alumunium panil kaca 5mm Unit 2.00 350,000.00 700,000.00
2,700,000.00
11 Pek. Pas. Profile GRC
a. Pek. Pas. Profile GRC tinggi 37cm M' 19.37 300,000.00 5,811,000.00
5,811,000.00
12 Pek. Pengecatan
a. Pek. Cat Air Dinding Exterior M2 86.76 34,518.83 2,994,853.26
b. Pek. Cat Air Dinding Interior M2 272.26 34,518.83 9,398,095.29
c. Pek. Cat Air Plafond Gypsum M2 72.75 34,518.83 2,511,244.52
d. Pek. Cat Coating Carport M2 15.00 28,150.00 422,250.00
e. Pek. Cat Kayu Duco M2 39.54 204,187.50 8,073,573.75
f. Pek. Cat Besi M2 10.20 44,506.00 453,961.20
RENCANA ANGGARAN BIAYA
PROYEK RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME
KAVLING : D6
N0 JENIS PEKERJAAN SAT VOLUME
78,375.00 1,598,066.25
189,750.00 -
913,470.18 -
26,125.00 #VALUE!
43,134.67 -
16,021.50 3,584,342.80
1,117,994.60 3,434,479.42 #VALUE!
46,068.00 1,864,832.64
16,021.50 7,865,364.50
1,117,994.60 4,242,789.52 Rp 13,972,987
35,000.00 875,000.00
43,461.00 1,238,638.50
88,341.00 1,060,092.00
30,332.50 454,987.50
29,821.00 1,073,556.00 Rp 4,702,274
127,875.00 2,134,233.75 Rp 2,134,234
46,068.00 318,422.02
16,021.50 3,235,379.15
1,117,994.60 1,030,343.83 Rp 4,584,145
108,006.25 22,185,563.81
69,036.00 21,899,599.92 Rp 44,085,164
41662.5 13,216,178.25 Rp 13,216,178
97,709.33 988,818.45
16,021.50 5,342,772.92
1,117,994.60 2,262,821.08 Rp 8,594,412
134,082.67 4,726,414.00
16,021.50 3,484,556.09
1,117,994.60 1,165,844.77 Rp 9,376,815
108,006.25 3,564,206.25
110,698.50 3,653,050.50 Rp 7,217,257
600,000.00 600,000.00
500,000.00 2,000,000.00
400,000.00 1,600,000.00
700,000.00 1,400,000.00
600,000.00 2,400,000.00
600,000.00 2,400,000.00 10,400,000.00
#VALUE! #VALUE!
#VALUE!
PROGRES
PROYEK : RUMAH TINGGAL 1 LANTAI
LOKASI : PERUM. DMAS HOME
KAVLING : D6
- 0.00% 100%
- 0.00% 100%
77.67 0.78% 84%
0.60 0.42% 84%
25.00 0.55% 0%
28.50 0.78% 0%
12.00 0.67% 0%
15.00 0.29% 0%
36.00 0.68% 0%
16.69 1.35% 0%
35.25 2.98% 0%
217.49 2.20% 0%
1.04 0.73% 0%
12.50 2.36% 0%
1.00 3.10% 0%
4.37 2.51% 0%
4.00 0.25% 0%
2.00 0.88% 0%
4.00 1.51% 0%
4.00 1.51% 0%
58.57%