A. LANTAI 1
I PEKERJAAN PERSIAPAN Rp 21,053,500.00
II PEKERJAAN TANAH DAN PONDASI Rp 15,914,614.43
III PEKERJAAN BETON BERTULANG Rp 405,873,052.32
IV PEKERJAAN PASANGAN DAN PLESTERAN Err:509
V PEKERJAAN LANTAI Rp 28,293,476.81
VI PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 47,055,101.29
VII PEKERJAAN INSTALASI LISTRIK Rp 329,000.00
IX PEKERJAAN PENGECATAN Rp 13,552,559.02
B. LANTAI 2
XI PEKERJAAN BETON BERTULANG Rp 48,581,519.66
XII PEKERJAAN PASANGAN DAN PLESTERAN Err:509
XIII PEKERJAAN LANTAI Rp 11,565,148.60
X PEKERJAAN PINTU, JENDELA DAN KUNCI Rp 47,055,101.29
XI PEKERJAAN ATAP DAN PLAFOND Rp 66,914,317.41
XII PEKERJAAN INSTALASI LISTRIK Rp 650,000.00
XIV PEKERJAAN PENGECATAN Rp 14,814,052.89
JUMLAH Err:509
PPN### Err:509
TOTAL RAB Err:509
DIBULATKAN Err:509
TERBILANG : Enam RATUS Tiga PULUH SATU JUTA Seratus Tiga Puluh RIBU RUPIAH
DAFTAR HARGA UPAH DAN SATUAN BAHAN BANGUNAN
UPAH
NO. TENAGA SATUAN HARGA
1 Mandor Orang Rp 100,000
2 Kepala Tukang Orang Rp 120,000
3 Tukang Orang Rp 110,000
4 Pekerja Orang Rp 85,000
BAHAN
NO. MATERIAL BAHAN SATUAN HARGA
1 Air Liter Rp 120
2 Atap Seng Genteng Lembar Rp 70,000
3 Batu Bata Buah Rp 800
4 Batu Kali/Batu belah (Sungaai/Gunung) M3 Rp 185,000
5 Batu Belah 5 - 7 M3 Rp 175,000
6 Batu Pecah 2 - 3 M3 Rp 320,000
7 Besi Beton Polos Kg Rp 13,000
8 Besi Beton Ulir Kg Rp 16,000
9 Besi Baja IWF Kg Rp 16,000
10 Besi Strip Tebal 5 mm Kg Rp 16,000
11 Cat Dasar Tembok/Sealer Setara Vinilex Kg Rp 25,000
12 Cat Dasar Kayu Kg Rp 45,000
13 Cat Kayu Mengkilat Kg Rp 55,000
14 Cat Kayu Penutup Kg Rp 55,000
15 Cat Menie Besi Kg Rp 30,000
16 Cat Tembok Setara Vinilex Kg Rp 40,000
17 Dempul Kayu Kg Rp 17,000
18 Dolken Kayu Ø 8 - 10/400 cm Batang Rp 65,000
19 Door Holder Pasang Rp 120,000
20 Engsel Jendela Pasang Rp 24,000
21 Engsel Pintu Pasang Rp 24,000
22 Floor Drain Buah Rp 20,000
23 Gypsum Board Tebal 9 mm Lembar Rp 110,000
24 Hak Angin Pasang Rp 15,000
25 Jaring Kawat Baja Kg Rp 25,000
26 Kaca Bening Uk. 3 mm M2 Rp 75,000
27 Kaca Bening Uk. 5 mm M2 Rp 100,000
28 Kaca Rayband Uk. 5 mm M2 Rp 125,000
29 Kaso-Kaso (5 x 7) cm M3 Rp 3,200,000
30 Kawat Beton Kg Rp 18,000
31 Kayu Kelas I (Seumantok /Ulim /dll) M3 Rp 5,000,000
32 Kayu Kelas II (Kamper /Kruing /dll) M3 Rp 4,500,000
33 Kayu Kelas III (Borneo /dll) M3 Rp 3,850,000
34 Kayu Kelas IV (Sengon /dll) M3 Rp 3,250,000
35 Keramik Uk. 10 x 10 cm Bh Rp 3,000
36 Keramik Uk. 20 x 20 cm Bh Rp 4,000
37 Keramik UK. 30 x 30 cm Bh Rp 6,500
38 Keramik Uk. 40 x 40 cm Bh Rp 11,000
39 Keramik Uk. 60 x 60 cm Bh Rp 30,000
40 Keramik Uk. 20 x 25 cm Bh Rp 30,000
41 Kertas Amplas Lembar Rp 2,500
42 Kloset Duduk Keramik Setara toto + Tabung Buah Rp 1,450,000
43 Kloset Jongkok Keramik Setara toto Buah Rp 400,000
44 Kran Air 3/4" Buah Rp 14,000
45 Kuas Cat Buah Rp 15,000
46 Kunci Pintu (Standar) Buah Rp 125,000
47 Kunci Pintu Biasa Buah Rp 85,000
48 Karawang /Roster Buah Rp 50,000
49 Kerikil kg Rp 1.350
50 Lampu Hemat Energi 11 Watt Setara Hannochs Buah Rp 30,000
51 Lampu Hemat Energi 18 Watt Setara Hannochs Buah Rp 35,000
52 Lampu Hemat Energi 20 Watt Setara Hannochs Buah Rp 40,000
53 Lem Kayu Kg Rp 18,000
54 List Eternit Kayu M1 Rp 7,000
55 Minyak Cat Liter Rp 24,000
56 Minyak Bekisting Liter Rp 7,500
57 Multipleks 3 mm Lembar Rp 75,000
58 Multipleks 4 mm Lembar Rp 85,000
59 Multipleks 6 mm Lembar Rp 120,000
60 Multipleks 9 mm Lembar Rp 140,000
61 Pacok Jendela dan Ventilasi Pasang Rp 7,500
62 Paku Asbes Kg Rp 18,000
63 Paku Beton 8 Inci Kotak Rp 19,000
64 Paku Kait Buah Rp 1,000
65 Paku Kayu Kg Rp 17,500
66 Paku Triplek Kg Rp 17,000
67 Paku Seng Kg Rp 19,500
68 Paku Sumbat Buah Rp 1,200
69 Paku Sekrup Kg Rp 24,000
70 Pasir Batu (Sirtu) - Material Jalan M3 Rp 300,000
71 Pasir Beton / Kerikil M3 Rp 185,000
72 Pasir Beton kg Rp 1.400
73 Pasir Pasang M3 Rp 175,000
74 Pasir Urug M3 Rp 120,000
75 Pelumas / Oil Liter Rp 35,000
76 Plamur Tembok Kg Rp 30,000
77 Plin Keramik Buah Rp 4,500
78 Plywood Tebal 9 mm Lembar Rp 140,000
79 Penjaga Jarak Bekisting /Sp Buah Rp 1,500
80 Profil Alluminium M1 Rp 15.000
81 Pemasangan Atap Baja Ringan M2 Rp 275,000
82 Pipa PVC 1" Batang Rp 35,000
83 Pipa PVC 2" Batang Rp 55,000
84 Pipa PVC 3" Batang Rp 100,000
85 Perlengkapan % Rp 50,000
86 Pengencer/Minyak Cat Liter Rp 20,000
87 Plamir Kg Rp 20,000
88 Plamir Kayu Kg Rp 20,000
89 Residu Kg Rp 10,000
90 Reservoir Air 500 Liter Buah Rp 1,200,000
91 Reservoir Air 1000 Liter Buah Rp 1,850,000
92 Reservoir Air 500 Liter Stainless Stell Buah Rp 2,000,000
93 Rabung Seng Genteng M1 Rp 35,000
94 Schakelar Buah Rp 12,000
95 Semen @ 40 Kg Zak Rp 55.000
96 Semen @ 40 Kg Kg Rp 1,375.000
97 Semen Putih @ 50 Kg Zak Rp 220,000
98 Semen Warna Kg Rp 4,000
99 Seng Genteng Metal M2 Rp 65,000
100 Seng BJLS 0,20 Cat Pabrik M2 Rp 47,500
101 Seng Gelombang BJLS 30 M2 Rp 55,000
102 Seng Gelombang BJLS 30 Cat Pabrik M2 Rp 60,000
103 Seng Plat BJLS 20 M2 Rp 40,000
104 Seng Plat BJLS 30 M2 Rp 55,000
105 Sekrup Fixer Buah Rp 500
106 Sealant Kg Rp 15,000
107 Sumur + Pompa Tangan Terpasang Unit Rp 1,750,000
108 Tanah Timbun M3 Rp 65,000
109 Teralis Besi M2 Rp 375,000
110 Titik Lampu + Instalasi Titik Rp 150,000
111 Tiang Pancang M1 Rp 250,000
112 Urinoir Keramik Buah Rp 2,350,000
113 Gagang Jendela Buah Rp 12,000
113 Zakering Buah Rp 300,000
No. Alat
1 Stamper Jam Rp 25,000
2 Dump Truck Jam Rp 75,000
3 Molen Jam Rp 50,000
ANALISA HARGA SATUAN PEKERJAA
No Uraian Satuan
A. TENAGA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
B. BAHAN
1 Plamir Kg
2 Cat Dasar Tembok Kg
3 Cat Tembok / Penutup 2X Kg
C. PERALATAN
No Uraian Satuan
A. TENAGA
1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
B. BAHAN
1 Cat Dasar Tembok Kg
2 Cat Tembok/Penutup 2x Kg
C. PERALATAN
Jumlah Peralatan Rp -
n Peralatan ( A + B + C ) Rp 24,536.00
X D Rp -
Rp 24,536.00
GA SATUAN PEKERJAAN
Jumlah Peralatan Rp -
n Peralatan ( A + B + C ) Rp 44,924.00
X D Rp -
Rp 44,924.00
A
NO.
I
1
2
3
4
5
II
1
a
2
a
III
1
IV
1
2
3
4
V
1
2
3
4
5
6
7
VI
VIII
1
2
3
4
X
1
5
3
4
III
1
2
3
IV
5
6
V
6
VI
VII
1
2
3
4
5
6
7
VIII
1
2
3
4
X
1
2
3
4
RENCANA
PEKERJAAN
LOKASI
B
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pembersihan Lapangan
Pengukuran / Pemasangan Bouplank
Administrasi dan Dokumentasi
K3 dan Lain-lain
Papan Nama Proyek
PEKERJAAN LANTAI
Pekerjaan Timbunan dan Urugan
Timbunan Tanah Bawah Teras, Selaras dan Ruangan
Urugan Pasir Bawah Teras, Selaras dan Ruangan
Pekerjaan Lantai
Beton Cor Bawah Teras, Selaras dan Ruangan
Pas. Keramik Lantai Teras, Selaras dan Ruangan 40 x 40
Pas. Keramik Tangga dan Bordes 40 x 40 cm LT 1
PEKERJAAN PENGECATAN
Cat Dinding Luar Dan Dalam
Cat Plafond
Cat Kusen, Daun Pintu dan Jendela
Cat Lisplank
PEKERJAAN LANTAI
Pas. Keramik Balkon dan Dalam Ruangan 40 x 40 cm LT
PEKERJAAN PENGECATAN
Cat Dinding Luar Dan Dalam
Cat Plafond
Cat Kusen, Daun Pintu dan Jendela
Cat Lisplank
RENCANA ANGGARAN BIAYA (RAB)
Pembangunan Bilik Santri Dayah Bayanuddin
Desa Matang Kumbang Kec. Simpang Ulim K
C D
Lantai 1
VOLUME SAT. ANALISA
9 Bh TAKSIR
1 Bh TAKSIR
4 Bh TAKSIR
5 Bh TAKSIR
Lantai 2
130.00 M2 TAKSIR
150.11 M2 AHSP PU A.4.5.2.32
20.00 M1 AHSP PU A.4.5.2.39.a
55.01 M1 AHSP PU A.4.6.1.21
59.91 M2 AHSP PU A.4.6.1.20
67.14 M2 AHSP PU A.4.5.1.7
118.64 M1 AHSP PU A.4.5.1.9
9 Bh TAKSIR
1 Bh TAKSIR
4 Bh TAKSIR
5 Bh TAKSIR
Rp 72,875.00 Rp -
Rp 32,538.00 Rp -
Rp 187,550.00 Rp -
Rp 430,782.00 Rp -
Rp 593,696.54 Rp -
Rp 72,875.00 Rp -
Rp 32,538.00 Rp -
Rp 187,550.00 Rp -
Rp 76,807.50 Rp 11,542,631.10
Rp 32,538.00 Rp 3,667,357.98
Rp 187,550.00 Rp 704,625.35
SUBTOTAL Rp 15,914,614.43
Rp 1,061,283.30 Rp 159,489,654.32
Rp 20,414.90 Rp 71,142,223.95
Rp 262,372.00 Rp 175,241,174.04
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 283,547.00 Rp -
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 283,547.00 Rp -
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 283,547.00 Rp -
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 548,801.00 Rp -
SUBTOTAL Rp 405,873,052.32
Rp 112,063.66 Rp -
Rp 53,695.46 Rp -
Rp 113,014.89 Err:509
Rp 54,459.44 Err:509
SUBTOTAL Err:509
Rp 139,425.00 Rp 2,088,154.28
Rp 187,550.00 Rp 1,259,295.10
Rp 114,950.00 Rp 385,913.01
Rp 191,718.48 Rp 12,994,965.81
Rp 191,718.48 Rp 11,565,148.60
SUBTOTAL Rp 28,293,476.81
Rp 8,731,875.00 Rp 2,920,497.84
Rp 645,000.00 Rp 8,927,832.00
Rp 637,075.00 Rp 131,981.55
Rp 637,075.00 Rp 4,134,361.92
Rp 186,725.00 Rp 746,900.00
Rp 43,655.00 Rp 349,240.00
Rp 35,000.00 Rp 280,000.00
Rp 8,731,875.00 Rp 3,138,445.44
Rp 478,200.00 Rp 1,762,836.48
Rp 130,405.00 Rp 652,650.94
Rp 637,075.00 Rp 193,201.91
Rp 637,075.00 Rp 5,512,482.56
Rp 34,655.00 Rp 277,240.00
Rp 43,655.00 Rp 349,240.00
Rp 27,155.00 Rp 217,240.00
Rp 12,000.00 Rp 48,000.00
Rp 8,731,875.00 Rp 4,358,952.00
Rp 478,200.00 Rp 2,644,254.72
Rp 130,405.00 Rp 978,976.42
Rp 637,075.00 Rp 270,323.66
Rp 637,075.00 Rp 8,268,723.84
Rp 34,655.00 Rp 277,240.00
Rp 43,655.00 Rp 349,240.00
Rp 27,155.00 Rp 217,240.00
Rp 12,000.00 Rp 48,000.00
SUBTOTAL Rp 47,055,101.29
Rp 6,000.00 Rp 54,000.000
Rp 20,000.00 Rp 20,000.000
Rp 30,000.00 Rp 120,000.000
Rp 27,000.00 Rp 135,000.000
SUBTOTAL Rp 329,000.000
Rp 24,536.00 Rp 8,852,834.16
Rp 40,160.00 Rp 2,405,889.22
Rp 40,160.00 Rp 1,851,986.43
Rp 40,160.00 Rp 441,849.21
SUBTOTAL Rp 13,552,559.02
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 548,801.00 Rp -
Rp 1,061,283.30 Rp 3,979,812.38
Rp 16,949.90 Rp 9,274,804.75
Rp 16,949.90 Rp 3,665,306.38
Rp 548,801.00 Rp 31,661,596.15
Rp 1,061,283.30 Rp -
Rp 16,949.90 Rp -
Rp 16,949.90 Rp -
Rp 548,801.00 Rp -
Rp 1,061,283.30 Err:509
Rp 16,949.90 Err:509
Rp 16,949.90 Err:509
Rp 548,801.00 Err:509
Rp 1,061,283.30 Err:509
Rp 16,949.90 Err:509
Rp 16,949.90 Err:509
Rp 548,801.00 Err:509
SUBTOTAL Rp 48,581,519.66
Rp 113,014.89 Err:509
Rp 54,459.44 Err:509
SUBTOTAL Err:509
Rp 191,718.48 Rp 11,565,148.60
SUBTOTAL Rp 11,565,148.60
Rp 8,731,875.00 Rp 2,920,497.84
Rp 645,000.00 Rp 8,927,832.00
Rp 637,075.00 Rp 131,981.55
Rp 637,075.00 Rp 4,134,361.92
Rp 186,725.00 Rp 746,900.00
Rp 43,655.00 Rp 349,240.00
Rp 35,000.00 Rp 280,000.00
Rp 8,731,875.00 Rp 3,138,445.44
Rp 478,200.00 Rp 1,762,836.48
Rp 130,405.00 Rp 652,650.94
Rp 637,075.00 Rp 193,201.91
Rp 637,075.00 Rp 5,512,482.56
Rp 34,655.00 Rp 277,240.00
Rp 43,655.00 Rp 349,240.00
Rp 27,155.00 Rp 217,240.00
Rp 12,000.00 Rp 48,000.00
Rp 8,731,875.00 Rp 4,358,952.00
Rp 478,200.00 Rp 2,644,254.72
Rp 130,405.00 Rp 978,976.42
Rp 637,075.00 Rp 270,323.66
Rp 637,075.00 Rp 8,268,723.84
Rp 34,655.00 Rp 277,240.00
Rp 43,655.00 Rp 349,240.00
Rp 27,155.00 Rp 217,240.00
Rp 12,000.00 Rp 48,000.00
Rp 47,055,101.29
Rp 250,000.00 Rp 32,500,000.00
Rp 106,700.00 Rp 16,016,851.17
Rp 28,552.00 Rp 571,040.00
Rp 105,350.00 Rp 5,795,420.12
Rp 111,135.00 Rp 6,657,831.13
Rp 47,910.00 Rp 3,216,893.00
Rp 18,175.00 Rp 2,156,282.00
SUBTOTAL Rp 66,914,317.41
Rp 35,000.00 Rp 315,000.000
Rp 20,000.00 Rp 20,000.000
Rp 45,000.00 Rp 180,000.000
Rp 27,000.00 Rp 135,000.000
SUBTOTAL Rp 650,000.000
Rp 24,536.00 Rp 8,852,834.16
Rp 40,160.00 Rp 2,696,523.12
Rp 40,160.00 Rp 2,822,846.40
Rp 40,160.00 Rp 441,849.21
SUBTOTAL Rp 14,814,052.89
TOTAL RAB Err:509
BACK UP DATA VOLUME PEKERJAAN
1 PEKERJAAN PERSIAPAN
A. Pembersihan Lapangan
Lebar = 16.00 m
Panjang = 29.00 m
Luas = ( Px L)
= ( 16 x 29 ) 464.000 M²
B. Pemasangan Bouwplank
Lebar = 14.00 m
Panjang = 27.00 m
Keliling = 2 x (P + L )
= 2 x ( 27+ 14 ) 82.000 M¹
Halaman 1
NO PERHITUNGAN VOLUME SATUAN
2. PEKERJAAN TANAH
A. Galian Tanah Untuk Pondasi
Tinggi = 2.0 m
Lebar = 1.7 m
Panjang = 1.7 m
Jumlah = 26 m
Volume = ( P x L x T ) x Unit
Tinggi = 0.05 m
Lebar = 1.7 m
Panjang = 1.7 m
Jumlah = 26 Unit
Volume = ( P x L x T ) x Unit
Halaman 2
NO PERHITUNGAN VOLUME SATUAN
1.a Pias I
Tinggi = 0.3 m
Lebar = 1.5 m
Panjang = 1.5 m
Jumlah = 26 Unit
volume = ( P x L x T ) x Unit
1.b Pias II
Tinggi = 0.05 m
Lebar = 1.5 m
Panjang = 1.5 m
Jumlah = 26 Unit
volume = ( P x L x T ) x Unit
Tinggi = 1.5 m
Lebar = 0.3 m
Panjang = 0.3 m
Jumlah = 26 Unit
volume = ( P x L x T ) x Unit
= (0.3 x 0.3 x 1.5) x 26 3.510 M³
Halaman 3
NO PERHITUNGAN VOLUME SATUAN
Lebar = 0.90 m
Panjang = 147.90 m
Volume = ( Px LxT)
= (147.90 x 0.90 x 0.80) 106.488 M³
Tinggi = 0.05 m
Lebar = 0.90 m
Panjang = 223.00 m
Volume = ( Px LxT)
1.d. Aanstamping
Tinggi = 0.1 m
Lebar = 0.90 m
Panjang = 223.00 m
Volume = ( Px LxT)
Halaman 4
` PERHITUNGAN VOLUME SATUAN
Tinggi = 0.70 m
Lebar a = 0.70 m
Lebar b = 0.30 m
Panjang = 223.00 m
Volume = (( a + b )/2 x P x T ))
= (( 0,30 + 0,70)/2 x 223 x 0,70) 78.05 M³
Halaman 5
` PERHITUNGAN VOLUME SATUAN
Tinggi = 0.32 m
Lebar = 12.00 m
Panjang = 25.00 m
Volume = ( Px LxT)
= ( 32 x 12 x 25 ) 96 M3
Tinggi = 0.10 m
Lebar = 12.00 m
Panjang = 25.00 m
Volume = ( Px LxT)
Lebar = 12.00 m
Panjang = 25.00 m
Volume = ( Px LxT)
Halaman 6
PEKERJAAN SLOOF
A. Sloof 20/40
Tinggi = 0.4 m
Lebar = 0.20 m
Panjang = 160.00 m
Volume = ( Px LxT)
= ( 160 x 0.20 x 0.40 ) 12.800 M³
B. Sloof 20/30
Tinggi = 0.3 m
Lebar = 0.20 m
Panjang = 63.00 m
Volume = ( Px LxT)
Halaman 7
NO PERHITUNGAN VOLUME SATUAN
PEKERJAAN KOLOM
A. Kolom Lantai 1
1.a. Kolom (K1) 30x30
Tinggi = 3.50 m
Lebar = 0.30 m
Panjang = 0.30 m
Unit = 24
Volume = (P x L x T) x Unit
Tinggi = 3.50 m
Lebar = 0.70 m
Panjang = 0.20 m
Unit = 2
Volume = (P x L x T) x Unit
Lebar = 0.20 m
Panjang = 0.20 m
Unit = 4
Volume = (P x L x T) x Unit
Halaman 8
NO PERHITUNGAN VOLUME SATUAN
Tinggi = 3.50 m
Lebar = 0.13 m
Panjang = 0.13 m
Unit = 36
Volume = (P x L x T) x Unit
B. Kolom Lantai ll
Tinggi = 3.70 m
Lebar = 0.30 m
Panjang = 0.30 m
Unit = 24
Volume = ( P x L x T ) x Unit
Lebar = 0.70 m
Panjang = 0.20 m
Unit = 2
Volume = ( P x L x T ) x Unit
Halaman 9
NO PERHITUNGAN VOLUME SATUAN
Tinggi = 3.70 m
Lebar = 0.13 m
Panjang = 0.13 m
Unit = 36
Volume = ( P x L x T ) x Unit
PEKERJAAN TANGGA
A Plat Tangga
1.a. Plat Tangga lt.1
Tinggi = 0.12 m
Lebar = 1.20 m
Panjang = 2.80 m
Volume = ( Px LxT)
Tinggi = 0.12 m
Lebar = 1.20 m
Panjang = 2.80 m
Volume = ( Px LxT)
Lebar = 0.30 m
Panjang = 1.20 m
Unit = 22
Volume = ( 1/2 x P x L x T x Unit )
Halaman 11
NO PERHITUNGAN VOLUME SATUAN
4.a. Borders
Tinggi = 0.15 m
Lebar = 1.50 m
Panjang = 3.00 m
Volume = (P x L x T )
= (3.00 x 1.50 x 0.15 ) 0.675 M3
PEKERJAAN BALOK
A. Balok Lantai
1.a. Balok Lantai 25/50
Tinggi = 0.50 m
Lebar = 0.25 m
Panjang = 66.00 m
Volume = ( Px LxT)
Tinggi = 0.30 m
Lebar = 0.20 m
Panjang = 62.50 m
Volume = ( Px LxT)
Tinggi = 0.15 m
Lebar = 0.13 m
Panjang = 70.00 m
Volume = ( Px LxT)
Tinggi = 0.15 m
Lebar = 0.13 m
Panjang = 48.00 m
Volume = ( Px LxT)
Halaman 13
NO PERHITUNGAN VOLUME SATUAN
Tebal = - m
Lebar = 8.00 m
Panjang = 22.00 m
Volume = ( Px L )
= ( 8 x 22 ) 176.00 M³
Tebal = - m
Lebar = - m
Panjang = - m
Tinggi = 0.25 m
Lebar = 0.15 m
Panjang = 22.25 m
Volume = ( Px LxT)
Tinggi = 0.40 m
Lebar = 0.20 m
Panjang = 169.00 m
Volume = ( Px LxT)
PEKERJAAN KERAMIK
A. Keramik Lt.1
1.a. Keramik 30/30 KM/WC
Tinggi = - m
Lebar = 11.72 m
Panjang = 12.00 m
Jumlah = - Unit
Volume = ( Px L)
= ( 11.72 x 12 ) 140.64 M2
Tinggi = - m
Lebar = - m
Panjang = - m
Jumlah = - Unit
Lebar = 3.00 m
Panjang = 4.00 m
Volume = (P x L)
= (3 x 4) 12 M2
Lebar = 1.28 m
Panjang = 2.87 m
Volume = (P x L)
= (1.28 x 2.87) 3.674 M2
Halaman 15
NO PERHITUNGAN VOLUME SATUAN
Tinggi = - m
Lebar = 3.00 m
Panjang = 4.00 m
Volume = (P x L)
= (3 x 4) 12.000 M2
Tinggi = - m
Lebar = 12.50 m
Panjang = 20.00 m
Volume = (P x L)
Tinggi = - m
Lebar = 5.00 m
Panjang = 3.50 m
Volume = (P x L)
= (5 x 3.5) 17.50 M2
Tinggi = - m
Lebar = 4.00 m
Panjang = 6.00 m
Volume = (P x L)
= (4 x 6 ) 24.00 M2
Halaman 16
NO PERHITUNGAN VOLUME SATUAN
Tinggi = - m
Lebar = 5.00 m
Panjang = 4.00 m
Volume = (P x L)
= (5 x 4 ) 20.00 M2
Tinggi = - m
Lebar = 4.00 m
Panjang = 3.50 m
Volume = (P x L)
= (4 x 3.5 ) 14.00 M2
Lebar = 4.00 m
Panjang = 3.50 m
Volume = (P x L)
= (4 x 3.5 ) 14.00 M2
Halaman 17
NO PERHITUNGAN VOLUME SATUAN
1. Luas Tanjakan
Lebar = 0.17 m
Panjang = 1.20 m
Unit = 23.00
Volume = (P x L ) x Unit
(0.17 x 1.20 ) x 23 4.692 M2
2. Luas Injakan
Lebar = 0.30 m
Panjang = 1.20 m
Unit = 23.00
Volume = (P x L ) x Unit
Halaman 18
NO PERHITUNGAN VOLUME SATUAN
B. Keramik Lt.2
Lebar = 11.72 m
Panjang = 12.00 m
Volume = (P x L) 140.64 M2
2. Keramik 30/30
Lebar = 1.00
Panjang = 1.30
Volume = (P x L) 1.30 M2
Halaman 19
NO PERHITUNGAN VOLUME SATUAN
Halaman 20
NO PERHITUNGAN VOLUME SATUAN
Halaman 21
Ruang D ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.50 m
Volume = ( Px LxT)
= ( 3.87 x 3,87 x 0,50 ) 7.49 M3
Ruang E ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.50 m
Volume = ( Px LxT)
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.10 m
Volume = ( Px LxT)
Halaman 3
Ruang B ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.10 m
Volume = ( Px LxT)
Ruang C ( ± 0,00 )
Panjang = 3.87 m
Lebar = 1.87 m
Tinggi = 0.10 m
Volume = ( Px LxT)
= ( 3,87 x 1,87 x 0,10 ) 0.72 M3
Ruang D ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.10 m
Volume = ( Px LxT)
Halaman 3
Ruang E ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.10 m
Volume = ( Px LxT)
= ( 3,87 x 3,87 x 0,10 ) 1.50 M3
= Ruang ( A + B + C + D + E )
Ruang A ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.05 m
Volume = ( Px LxT)
Ruang B ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.05 m
Volume = ( Px LxT)
Ruang C ( ± 0,00 )
Panjang = 3.87 m
Lebar = 1.87 m
Tinggi = 0.05 m
Volume = ( Px LxT)
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.05 m
Volume = ( Px LxT)
Halaman 3
Ruang E ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Tinggi = 0.05 m
Volume = ( Px LxT)
= Ruang ( A + B + C + D + E )
Ruang A ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Volume = ( Px L)
Ruang B ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Volume = ( Px L)
Halaman 3
Ruang C ( ± 0,00 )
Panjang = 3.87 m
Lebar = 1.87 m
Volume = ( Px L)
Ruang D ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Volume = ( Px L)
Ruang E ( ± 0,00 )
Panjang = 3.87 m
Lebar = 3.87 m
Volume = ( Px L)
Pintu
Panjang = 0.13 m
Lebar = 0.80 m
Jumlah = 4 Unit
Volume = ( P x L ) x Unit
Akses Ruang C
Panjang = 0.13 m
Lebar = 1.70 m
Volume = ( Px L)
Panjang = 3.87 m
Lebar = 3.87 m
Jumlah = 4 Unit
Volume = ( P x L ) x Unit
Pintu
Panjang = 0.13 m
Lebar = 0.80 m
Jumlah = 4 Unit
Volume = ( P x L ) x Unit
Tipe P1
Tinggi = 0.13 m
Lebar = 0.06 m
Panjang = 5.36 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
Daun Pintu P1
Tinggi = 2.11 m
Lebar = 0.82 m
Jumlah = 8 Unit
Luas = ( L x T ) x Unit
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
= ( 3,32 x 0,06 x 0,13 ) x 8 0.21 M3
Papan Jalusi P1
Lebar = 0.13 m
Tinggi = 6.24 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
B Jendela J1
Kusen Jendela J1
Panjang = 5.76 m
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
Kaca J1
Lebar = 0.92 m
Tinggi = 0.68 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
Daun Jendela J1
Lebar = 5.76 m
Tinggi = 0.08 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
= ( 5.76 x 0,08 ) x 8 3.69 M2
Ventilasi Kusen J1
Panjang = 4.86 m
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
Papan Jalusi J1
Lebar = 0.13 m
Tinggi = 8.32 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
= ( 0.13 x 8.32 ) x 8 8.65 M3
C Jendela J2
Kusen Jendela J2
Panjang = 8.00 m
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
= ( 8,00 x 0,06 x 0,13 ) x 8 0.50 M3
Kaca J2
Lebar = 1.38 m
Tinggi = 0.68 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
Daun Jendela J2
Lebar = 8.64 m
Tinggi = 0.08 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
Panjang = 6.80 m
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 8 Unit
Volume = ( P x L x T ) x Unit
Papan Jalusi J2
Lebar = 0.13 m
Tinggi = 12.48 m
Jumlah = 8 Unit
Volume = ( L x T ) x Unit
Panjang = 4.18 m
Lebar = 0.06 m
Tinggi = 0.13 m
Jumlah = 2 Unit
Volume = ( P x L x T ) x Unit
Panjang = 20 m
Lebar = 6.50 m
Jumlah = 1 Unit
Volume = ( Px L)
= ( 20 x 6.50 ) 130.00 M2
B Penutup Atap
Bidang A
Panjang = 20 m
Lebar = 7.506 m
Jumlah = 1 Unit
Volume = ( Px L)
= ( 20 x 7,506 ) 150.11 M2
C Rabung Atap
D Papan Listplank
Panjang = 3.87 m
Lebar = 3.87 m
Jumlah = 4 Unit
Volume = ( P x L ) x Unit
Panjang = 17.35 m
Lebar = 3.87 m
Jumlah = 1 Unit
Volume = ( P x L ) x Unit
Tipe Miring
Panjang = 15.01 m
Lebar = 0.90 m
Jumlah = 2 Unit
Volume = ( P x L ) x Unit
Panjang = 20.00 m
Lebar = 0.90 m
Jumlah = 2 Unit
Volume = ( P x L ) x Unit
= ( 20 x 0.90 ) x 2 36.00 M2
= ( 27.02 + 36 ) 63.02 M2
H Plafond (Lt.1)
Panjang = 3.87 m
Lebar = 3.87 m
Jumlah = 4 Unit
Volume = ( P x L ) x Unit
I Plafond (Lt.2)
Panjang = 17.35 m
Lebar = 3.87 m
Jumlah = 1 Unit
Volume = ( P x L ) x Unit
Panjang = 55.011 m
Tinggi = 0.20 m
Volume = ( PxT)
Lebar = 0.25 m
Panjang = 5.36 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
H Ventilasi Kusen P1
Panjang = 3.32 m
Lebar = 0.25 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
I Kusen Jendela J1
Panjang = 5.76 m
Lebar = 0.25 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
J Ventilasi Kusen J1
Panjang = 4.86 m
Lebar = 0.25 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
K Kusen Jendela J2
Panjang = 8.00 m
Lebar = 0.25 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
L Ventilasi Kusen J2
Panjang = 6.80 m
Lebar = 0.25 m
Jumlah = 8 Unit
Volume = ( P x L ) x Unit
Panjang = 4.18 m
Lebar = 0.25 m
Jumlah = 2 Unit
Volume = ( P x L ) x Unit
Volume Kusen
N Daun Pintu P1
Tinggi = 2.11 m
Lebar = 0.82 m
Jumlah = 8 Unit
Luas = 2 x ( L x T ) x Unit
= 2 x ( 0,82 x 2.11 ) x 8 27.68 M2
O Daun Jendela J1
Lebar = 5.76 m
Tinggi = 0.08 m
Jumlah = 8 Unit
Volume = 2 x( L x T ) x Unit
Lebar = 8.64 m
Tinggi = 0.08 m
Jumlah = 8 Unit
Volume = 2 x ( L x T ) x Unit
Volume Kusen
man 18
GAMBAR
man 19
GAMBAR
man 20
GAMBAR
man 21
GAMBAR
GAMBAR
GAMBAR
GAMBAR
GAMBAR
GAMBAR
17.36
50.84
PERHITUNGAN BESI DAN BEKISTING
1 2 3
Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = Batang Berat besi Ø 14, = 80.5560 kg
Ø Tul. Pinggang = mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø , = - kg
Luas Permukaan Papan = 0.80 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 1.250 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 83.33 ± ------->
84 btg
1 2 3
1 2 3
1 2 3
Ø Tul. Pokok = 14.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 14, = 107.4080 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.120 M Berat besi Ø -, = #VALUE! kg
Luas Permukaan Papan = 1.20 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 1.050 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 92.59 ± ------->
93 btg
1 2 3
1 2 3
1 2 3
1 2 3
1 2 3
Ø Tul. Pokok = 12.00 mm 1. Tul pokok = Pjg balok x byk tul x 0.006165 x dia.2
Jumlah Tul. Pinggang = - Batang Berat besi Ø 12, = 118.3680 kg
Ø Tul. Pinggang = - mm
Ø Tul. Begel = 8.00 mm 2. Tul pinggang = Pjg balok x byk tul x 0.006165 x dia.2
Jarak Begel = 0.100 M Berat besi Ø 0, = - kg
Luas Permukaan Papan = 0.55 M2
3. Tulangan Begel Besi Ø 8,
Panjang begel = 0.550 m'
Banyak begel = Pjg balok untuk 1 m3 beton/jarak begel
= 333.33 ± ------->
334 btg
1 2 3
1 2 3
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
PERHITUNGAN VOLUME
Kg / M3 Beton
M2 / M3 Beton
PERHITUNGAN VOLUME
Kg / M3 Beton
M2 / M3 Beton