Desa : PURWOREJO
Kecamatan : WATES
Kabupaten : BLITAR
Jenis Kegiatan : TALUD/ TPT JALAN DSN SUMBERURIP RT. 01 RW. 01
Harga Satuan
No. Material / Alat / Tenaga Satuan
Harga Survey PPN
92 Pekerja 0h Rp 75,000
93 Tukang 0h Rp 90,000
94 Kepala Tukang 0h Rp 100,000
1 2 3 4
- TENAGA
Harga Satuan
Harga
PPh 21 PPh 22 PPh 23 satuan
RAB
5,100 175,100
6,450 221,500
6,000 206,000
5,250 180,300
- 100
6,000 206,000
5,250 180,300
3,750 128,800
5,250 180,300
7,350 276,900
7,800 293,800
1,530 57,700
- -
1,200 45,200
1,950 73,500
990 37,300
1,455 54,900
2,250 84,800
3,450 130,000
600 22,600
600 22,600
3,900 146,900
4,650 175,200
840 31,700
540 20,400
360 13,600
930 35,100
540 20,400
360 13,600
1,200 45,200
4,650 175,200
3,450 130,000
2,520 95,000
315 11,900
750 28,300
165 6,300
525 19,800
750 28,300
1,350 50,900
1,650 62,200
750 28,300
2,400 90,400
525 19,800
750 28,300
1,350 50,900
1,650 62,200
750 28,300
1,500 56,500
2,550 96,100
3,750 141,300
750 28,300
300 11,300
1,800 67,800
510 19,300
300 11,300
270 10,200
450 17,000
300 11,300
1,260 47,500
450 17,000
75 2,900
165 6,300
1,200 45,200
75 2,900
2,250 84,800
30 1,200
250,000
350,000
3,300 124,300
1,050 39,600
300 11,300
1,950 73,500
2,850 107,400
2,100 79,100
1,800 67,800
2,550 96,100
1,500 56,500
600 22,600
750 28,300
300 11,300
16,500 621,500
675 25,500
225 8,500
8,250 310,800
8,400 316,400
15,000 565,000
360 13,600
270 10,200
486 18,400
180 6,800
450 17,000
9,000 459,000
2,000 102,000
75,000
90,000
100,000
8 9 10 11
Panjang 6
Lebar 3.3
PERHITUNGAN VOLUME
Panjang (P) Lebar (L)
Ttk Jenis Pekerjaan
m' m'
I Pas Langit2 6.00 3.30
Jumlah Volume
BAHAN
Rincian Koef Vol Jml sat
Triplek tebal 4 mm 0.364 19.80 3.00 lbr
PERHITUNGAN VOLUME
Panjang (P)
Jenis Pekerjaan
m'
Pasang List Plafond 1/5 137.60
Jumlah Volume
BAHAN
Rincian Koef Vol Jml sat
Kayu 1/5 List 1.05 137.60 36 Ljr
TENAGA KERJA
Rincian Koef Konv Vol Jml sat
Tukang 0.10 1.00 19.80 2.00 OH
Pekerja 0.10 1.00 19.80 2.00 OH
KETERANGAN
Jumlah Volume 19.80
169,500 Harga Sat. Pekerjaan 2,601,300
2,079,200
HARGA SATUAN PELAKSANAAN
22,600
180,000
150,000 131,378.79 / m2
2,601,300
UME
Panjang (P) Volume
m' m'
137.60 137.60
137.60
TENAGA KERJA
Rincian Koef Konv Vol Jml sat
Tukang 0.060 1.00 137.60 8.00 OH
Pekerja 0.060 1.00 137.60 8.00 OH
KETERANGAN
Jumlah Volume 137.60
428,400 Harga Sat. Pekerjaan 1,771,000
N DAN UPAH
TENAGA KERJA
TENAGA KERJA VOLUME SATUAN
Tukang 10 OH
Pekerja 10 OH