HARGA
KELOMPOK No. URAIAN SATUAN
SATUAN BAHAN
1 2 3 4 5
B BAHAN/MATERIAL
1 Air Kerja Ls Rp. 5,000,000
2 Alkali Resisting Kg Rp. 60,000
3 Cat Dasar Dulux Catylac 4 Kg Kg Rp. 28,750
4 Cat Kayu Avian Kg Rp. 47,000
5 Cat Meni Kayu Kg Rp. 61,000
6 Cat Tembok Dulux Catylac 5 Kg Kg Rp. 23,000
7 American Standart Kloset Duduk Bh Rp. 1,265,000
8 Amplas Lbr Rp. 5,000
9 Anti Lumut Kg Rp. 90,000
10 Atap Genteng Kanmuri Milenio 32,2 x 31,7 cm Bh Rp. 9,500
11 AW Pipa PVC Ø 1" M Rp. 10,000
12 AW Pipa PVC Ø 1/2" M Rp. 6,000
13 AW Pipa PVC Ø 3/4" M Rp. 7,500
14 AW Pipa PVC Ø 3" M Rp. 25,000
15 Batu Apung Kg Rp. 10,300
16 Batu Bata Merah Bh Rp. 400
17 Batu Batako 10/20/40 Bh Rp. 4,500
18 Batu Kali M3 Rp. 185,000
19 Baut Engsel/Teralis Bks Rp. 5,000
20 Baut Ø12-15 Bh Rp. 15,000
21 Baut Ø16-20 Bh Rp. 17,500
22 Belucci Kunci type hYPO-NP Bh Rp. 240,000
23 Besi Polos Ø 10 mm Kg Rp. 8,250
24 Besi Polos Ø 12 mm Kg Rp. 8,250
25 Besi Polos Ø 16 mm Kg Rp. 8,250
26 Besi Polos Ø 8 mm Kg Rp. 8,250
27 Besi Ulir Ø 10 mm Kg Rp. 8,250
28 Besi Ulir Ø 12 mm Kg Rp. 8,250
29 Besi Ulir Ø 16 mm Kg Rp. 8,250
30 Besi Ulir Ø 8 mm Kg Rp. 8,250
31 Besi Strip Kg Rp. 10,684
32 Bubungan (Nok) Genteng Kanmuri Bh Rp. 50,000
33 Keramik Lt Kamar Mandi Kasar 30x30 KIA Coral M2 Rp. 58,000
34 Falco Engsel Jendela 3" Bh Rp. 21,000
35 Falco Engsel Pintu 5 " Bh Rp. 50,000
36 Grendel Jendela Bh Rp. 12,000
37 Grendel Pintu / Expagnolet Unit Rp. 54,000
38 Gypsum lbr Rp. 135,000
39 Hak Angin 10 inch Bh Rp. 38,500
40 Keramik lantai Polos 30x30 Asia Tile Murano M2 Rp. 40,000
41 Impra Dempul Kg Rp. 23,750
42 Impresso Keramik 30x30 Bh Rp. 4,409
43 Indocement Portland 50 kg Kg Rp. 1,360
44 Jendela Kaca/Jalusi Miring Set Rp. 353,000
45 Kaca Bening t = 5 mm M2 Rp. 92,500
46 Kaca Hitam t = 5 mm Bh Rp. 68,500
47 Kalsiboard Ling 3,5 mm, Ukuran 1,2 x 2,4 m Lbr Rp. 56,750
48 Kawat Bendrad Kg Rp. 20,000
49 Kawat Beton Kg Rp. 25,000
50 Kawat Duri 30 meter M' Rp. 4,833
51 Kayau Borneo Balok 5/7 Kelas III M3 Rp. 1,600,000
3
52 Kayau Borneo Balok 6/12 kelas III M Rp. 1,800,000
53 Kayu Meranti Balok 6/12 Kelas II M3 Rp. 2,400,000
3
54 Kayu Meranti Papan 3/20 M Rp. 2,400,000
3
55 Kayu Bengkirai Balok 6/12 kelas I M Rp. 10,750,000
56 Kayu Bengkirai Papan 4/20 keas I M3 Rp. 9,750,000
57 kayu Dolken Galam Ø 8 -10/4 m Btg Rp. 25,000
58 Kayu Jati Balok 6/12 Kls. 1 M3 Rp. 18,700,000
3
59 Kayu Meranti Kaso 4/6 M Rp. 2,000,000
3
60 Kayu Meranti Reng 3/4 M Rp. 2,000,000
61 Kerikil Beton M3 Rp. 210,000
62 Kia Keramik 40x40 Bh Rp. 12,500
63 Kia Polos Keramik 20x20 M2 Rp. 45,700
64 Kran Air Bh Rp. 35,000
65 Kuas 4" Bh Rp. 17,000
66 Kusen Meranti M' Rp. 95,750
67 Lambersering meranti M' Rp. 20,000
68 Lexus Westafel Bh Rp. 360,000
69 List Gypsum Type C7 M' Rp. 6,000
70 List Profil Kayu M' Rp. 25,000
71 Lock Window Bh Rp. 45,000
72 Minyak Bekisting Ltr Rp. 20,000
73 Nicole Kunci Set Rp. 124,500
74 Nok Surya Roof 100 mm Bh Rp. 40,000
75 Nok Surya Roof 33 mm Bh Rp. 22,000
76 Paku Biasa 2" - 5" Kg Rp. 22,000
77 Paku Sekrup Kg Rp. 45,000
78 Paku Ulin 1" - 5" Kg Rp. 38,000
79 Paragon Plamir 5 Kg Kg Rp. 9,000
80 Pasir Cor/Beton M3 Rp. 284,000
3
81 Pasir Pasang M Rp. 190,000
3
82 Pasir urug M Rp. 170,000
83 Pemasangan Listrik 1.300 VA Ls Rp. 2,165,000
84 Perlatan Kecil Ls Rp. 174,500
85 T-Dos (Kontak Hubung Bagi) Bh Rp. 5,500
86 Pintu Meranti 80-100 x 200 Bh Rp. 1,000,000
87 Triplek t = 6 mm, 122 x 244 Lbr Rp. 69,000
88 Triplek t = 9 mm Lbr Rp. 98,000
89 Triplek t =3 mm Lbr Rp. 44,000
90 Pujatex Cat Minyak Kg Rp. 35,000
91 Toren/Tangki Air 1200 L Bh Rp. 1,350,000
92 Rol Cat Bh Rp. 29,000
93 Semen Warna Kg Rp. 11,000
94 Seng Gelombang BJLS 32 Lbr Rp. 116,000
95 Sirtu M3 Rp. 90,000
96 Talang Air PVC Btg Rp. 68,000
97 Tanah Urug M3 Rp. 200,000
98 Teralis Pengaman jendela Bh Rp. 250,000
99 Toto Kloset Jongkok Bh Rp. 290,000
100 Tonasa Semen Portland 50 kg Kg Rp. 1,100
101 Bak Cuci Piring Stainless 75 x 40 Cm Bh Rp. 235,000
102 Tulangan Bh Rp. 8,250
103 Floor Drain Bh Rp. 35,000
104 Water Drain dan Asesories Bh Rp. 55,000
105 Pipa PVC Listrik M' Rp. 1,625
106 Saklar Tunggal Bh Rp. 10,000
107 Kabel NYY 2.5 mm2 M Rp. 16,000
108 Kabel NYY 1.5 mm2 M Rp. 11,000
109 Lampu LED Philips 20W Bh Rp. 38,000
110 Fitting Lampu Bh Rp. 7,000
111 Inbouw Doss Bh Rp. 7,500
112 Perlengkapan (Isolasi, Paku, Klem, Samb) set Rp. 34,000
113 Stop Kontak Bh Rp. 24,000
114 Lampu TL Philips Lengkap 40 W Bh Rp. 100,000
115 Box MCB Bh Rp. 75,000
116 Seng Plat BJLS 30 Lbr Rp. 48,000
117 MCB 6A Bh Rp. 44,000
118 Sewa Stamper Hari Rp. 12,292
119 Lem Kayu Presto DN Galon (4 Kg) Kg Rp. 35,000
120 Wastafel Toto Bh Rp. 750,000
121 Peralatan Kecil Pemasangan Listrik Ls Rp. 100,000
122 Biaya Pemasangan Listrik Ls Rp. 1,500,000
123 Bak Mandi (Bathtub) Fibreglass Bh Rp. 2,350,000
124 Seal Tape Bh Rp. 3,000
125 TOTO Umi Single Lever Shower Set Bh Rp. 1,600,000
126 Pintu UPVC satu Set Bh Rp. 950,000
127 Teer Anti Rayap Oles 5,5 Liter Ltr Rp. 36,000
128 Plamir Kayu Damex 5Kg Kg Rp. 15,000
129 Septictank Biotech Bh Rp. 2,000,000
MENGHITUNG VOLUME PEKERJAAN
A PEKERJAAN PERSIAPAN
A.1 PEKERJAAN PERSIAPAN
- PEMBERSIHAN SITE ATAU LOKASI LAHAN
VOL = PANJANG LAHAN X LEBAR LAHAN
= 10 X 6
= 60
- PENGUKURAN DAN PEMASANGAN BOWPLANK
VOL = [ ( PANJANG BANGUNAN + 2 ) X 2 ] + [ ( LEBAR BANGUNAN + 2 ) X 2 ]
= 6 + 2 = 8 X 2 = 16
= 6 + 2 = 8 X 2 = 16
= 32
- PEKERJAAN AIR KERJA
VOL = 1 Lumpsum (Ls)
B PEKERJAAN PONDASI
B.1 PEKERJAAN GALIAN TANAH
- GALIAN TANAH
VOL = PJG GALIAN X TINGGI GALIAN X LEBAR GALIAN
= 44 X 1 X 0.8
= 35.20
C PEKERJAAN DINDING
C.3 PEKERJAAN BETON BERTULANG
- VOLUME SLOOF
VOL = PANJANG SLOOF X LUAS PENAMPANG SLOOF = PANJANG GALIAN X TINGGI X LEBAR SLOOF
= X = 44 X 0.2 X 0.15
= 1.32
- VOLUME KOLOM 15 x 20
VOL = TINGGI KOLOM X LUAS PENAMPANG KOLOM = TINGGI KOLOM X PANJANG X LEBAR KOLOM X JUMLAH KOLOM
= 3 X 0.15 X 0.2 X 14
= 1.26
- VOLUME BALOK 15 x 20
VOL = PANJANG BALOK X LUAS BALOK X TINGGI BALOK
= 36 X 0.15 X 0.2
= 1.08
- * BUBUNGAN GENTING
VOL (M) = PANJANG BALOK NOK YANG AKAN DITUTUPI BUBUNGAN GENTING
= 8
F PEKERJAAN PLAFOND
F.1 PEKERJAAN RANGKA PLAFOND KAYU
- * RANGKA PLAFON
VOL (M2) = JUMLAH LUAS RUANGAN YANG AKAN DIPASANGI PLAFON
= 36
L PEKERJAAN LUAR
L.1 PEKERJAAN PERLENGAPAN LUAR
- Pekerjaan Septictank = 1 Ls
- Pekerjaan Toren = 1 Ls
VOLUME PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT
A PEKERJAAN PERSIAPAN
A.1 Pekerjaan Persiapan
A.1.1. Pembersihan Lapangan 60.0000 M2
A.1.2. Pemasangan Bouplank/Pengukuran 32.0000 M
A.1.3. Pengadaan Air Kerja 1.0000 Ls
B PEKERJAAN PONDASI
B.1. Pekerjaan Galian Tanah
B.1.1. Galian Tanah Keras 1 Meter 0.0000 M3
B.1.2. Galian Tanah Biasa 1 Meter 35.2000 M3
B.1.3. Urugan Tanah Kembali 26.8800 M3
B.1.4. Urugan Pasir 3.5600 M3
B.1.5. Pemadatan Tanah 26.8800 M3
C PEKERJAAN BETON
C.3. Beton Bertulang
C.3.1. Sloof 15 x 20 1.3200 M3
C.3.2. Kolom 15 x 20 1.2600 M3
C.3.3. Balok 15 x 20 1.0800 M3
C.3.4. Meja Beton Bertulang 0.0960 M3
D PEKERJAAN DINDING
D.1. Dinding
D.1.1. Pasangan Dinding 1/2 Bata (1:5) 113.9000 M2
D.1.2. Pasangan Dinding 1 Bata (1:5) 0.0000 M2
D.2. Plasteran
D.2.1. Plasteran Dinding (1:3) 152.9000 M2
D.2.2. Plasteran Dinding (1:4) 0.0000 M2
D.3. Acian
D.3.1. Acian 152.9000 M2
F PEKERJAAN PLAFOND
F.1. Rangka Plafond
F.1.1. Rangka Plafond 36.0000 M2
G PEKERJAAN SANITASI
G.1. Memasang 1 Buah Kloset Duduk
G.1.1. Memasang 1 Buah Kloset Duduk 1.0000 Bh
K PEKERJAAN PENGECATAN
K.1. Pengecatan Tembok Baru
K.1.1. Pengecatan Tembok Baru 152.9000 M2
L PEKERJAAN LUAR
L.1. Pekerjaan Perlengkapan Luar
L.1.1. Pekerjaan Septictank 1.0000 Ls
L.1.2. Pekerjaan Toren Dan Dudukan 1.0000 Ls
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
B. 1.3 Tiap 1 M3 Urugan Tanah Kembali (1/3 kali dari indeks galian tanah) 24,792
Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Mandor OH 0.0100 125,000 1,250
29,750
Tenaga Kerja
1 Pekerja OH 0.7800 95,000 74,100
2 Tukang Batu OH 0.3900 115,000 44,850
3 Kepala Tukang Batu OH 0.0390 120,000 4,680
4 Mandor OH 0.0390 125,000 4,875
128,505
Tenaga Kerja
1 Pekerja OH 1.5000 95,000 142,500
2 Tukang Batu OH 0.6000 115,000 69,000
3 Kepala Tukang Batu OH 0.0600 120,000 7,200
4 Mandor OH 0.0750 125,000 9,375
228,075
C. ANACISA HARGA SATUAN PEKERJAAN BETON
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
C. 1 PEKERJAAN BEKISTING
C. 1.1 Tiap 1 M2 Pasangan Bekisting Untuk Sloof 142,745
Bahan
1 Balok Kayu Kls III M3 0.0450 1,600,000 72,000
2 Paku Biasa 3-5 cm Kg 0.3000 22,000 6,600
3 Minyak Bekiting Ltr 0.1000 20,000 2,000
80,600
Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang Kayu OH 0.2600 115,000 29,900
3 Kepala Tukang Kayu OH 0.0260 120,000 3,120
4 Mandor OH 0.0050 125,000 625
62,145
Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
71,160
Tenaga Kerja
1 Pekerja OH 0.3200 95,000 30,400
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
73,060
Tenaga Kerja
1 Pekerja OH 0.3200 95,000 30,400
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
73,060
C. 2 PEKERJAAN BETON
C. 2.1 Tiap 1 M3 Pembuatan Beton Mutu f'c=7,4 Mpa (K175) 874,942
Bahan
1 Tonasa Semen Portland 50 Kg Kg 326.0000 1,100 358,600
2 Pasir Beton M3 0.5430 284,000 154,212
3 Kerikil Beton M 3
0.7620 210,000 160,020
672,832
Tenaga Kerja
1 Pekerja OH 1.6500 95,000 156,750
2 Tukang OH 0.2750 115,000 31,625
3 Kepala Tukang OH 0.0280 120,000 3,360
4 Mandor OH 0.0830 125,000 10,375
202,110
Tenaga Kerja
1 Pekerja OH 1.6500 95,000 156,750
2 Tukang OH 0.2750 115,000 31,625
3 Kepala Tukang OH 0.0280 120,000 3,360
4 Mandor OH 0.0830 125,000 10,375
202,110
C. 3 BETON BERTULANG
C. 3.1 Tiap 1 M3 Untuk Sloof Beton Bertulang 15 x 20 cm 4,201,684
1 Beton K. 175 Mpa M3 1.0000 874,942 874,942
2 Bekisting Sloof M2 13.3333 142,745 1,903,262
3 Besi Beton Polos Kg 172.5430 8,250 1,423,480
4,201,684
Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0150 125,000 1,875
43,075
Tenaga Kerja
1 Pekerja OH 0.6500 95,000 61,750
2 Tukang OH 0.2000 115,000 23,000
3 Kepala Tukang OH 0.0200 120,000 2,400
4 Mandor OH 0.0300 125,000 3,750
90,900
D. 2 PEKERJAAN PLESTERAN
D. 2.1 Tiap 1 M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm 52,224
Bahan
1 Tonasa Semen Portland 50 Kg Kg 7.7760 1,100 8,554
2 Pasir Pasang M3 0.0230 190,000 4,370
12,924
Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang OH 0.1500 115,000 17,250
3 Kepala Tukang OH 0.0150 120,000 1,800
4 Mandor OH 0.0100 125,000 1,250
39,300
Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang OH 0.1500 115,000 17,250
3 Kepala Tukang OH 0.0150 120,000 1,800
4 Mandor OH 0.0100 125,000 1,250
39,300
Tenaga Kerja
1 Pekerja OH 0.1500 95,000 14,250
2 Tukang OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0080 125,000 1,000
27,950
E. ANALISA HARGA SATUAN PEK. KUDA-KUDA DAN ATAP
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
Tenaga Kerja
1 Pekerja OH 4.0000 95,000 380,000
2 Tukang Kayu OH 12.0000 115,000 1,380,000
3 Kepala Tukang Kayu OH 1.2000 120,000 144,000
4 Mandor OH 0.2000 125,000 25,000
1,929,000
Tenaga Kerja
1 Pekerja OH 2.4000 95,000 228,000
2 Tukang Kayu OH 7.2000 115,000 828,000
3 Kepala Tukang Kayu OH 0.7200 120,000 86,400
4 Mandor OH 0.1200 125,000 15,000
1,157,400
Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0050 125,000 625
22,825
E. 1.4 Tiap 1 M' Pekerjaan Lisplank Ukuran 3 x 30 cm, Kayu Kelas II 63,025
Bahan
1 Kayu Meranti Papan Kls II M3 0.0110 2,400,000 26,400
2 Paku Biasa Kg 0.0500 22,000 1,100
27,500
Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0050 125,000 625
35,525
Tenaga Kerja
1 Pekerja OH 0.0400 95,000 3,800
2 Tukang Kayu OH 0.4000 115,000 46,000
3 Kepala Tukang Kayu OH 0.0250 120,000 3,000
4 Mandor OH 0.0013 125,000 163
52,963
Tenaga Kerja
1 Pekerja OH 0.1500 95,000 14,250
2 Tukang Kayu OH 0.0750 115,000 8,625
3 Kepala Tukang Kayu OH 0.0080 120,000 960
4 Mandor OH 0.0080 125,000 1,000
24,835
Tenaga Kerja
1 Pekerja OH 0.4000 95,000 38,000
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang OH 0.0200 120,000 2,400
4 Mandor OH 0.0200 125,000 2,500
65,900
F. ANALISA HARGA SATUAN PEKERJAAN PLAFOND
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang Kayu OH 0.3000 115,000 34,500
3 Kepala Tukang Kayu OH 0.0300 120,000 3,600
4 Mandor OH 0.0130 125,000 1,625
58,725
F. 2 PASANG PLAFOND
F. 2.1 Tiap 1 M2 Pemasangan Plafond Plywood 6 mm, uk. (1,22x2,44) m 46,385
Bahan
1 Triplek 6 mm Lbr 0.3750 69,000 25,875
2 Paku Biasa Kg 0.0300 22,000 660
26,535
Tenaga Kerja
1 Pekerja OH 0.0700 95,000 6,650
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0040 125,000 500
19,850
Tenaga Kerja
1 Pekerja OH 0.0500 95,000 4,750
2 Tukang Kayu OH 0.0500 115,000 5,750
3 Kepala Tukang Kayu OH 0.0050 120,000 600
4 Mandor OH 0.0030 125,000 375
11,475
Tenaga Kerja
1 Pekerja OH 1.0000 95,000 95,000
2 Tukang Batu OH 1.5000 115,000 172,500
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1600 125,000 20,000
305,500
Tenaga Kerja
1 Pekerja OH 0.0100 95,000 950
2 Tukang Batu OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0050 125,000 625
14,275
Tenaga Kerja
1 Pekerja OH 0.5000 95,000 47,500
2 Tukang Batu OH 0.0500 115,000 5,750
3 Kepala Tukang Batu OH 0.0050 120,000 600
4 Mandor OH 0.0010 125,000 125
53,975
Tenaga Kerja
1 Pekerja OH 1.2000 95,000 114,000
2 Tukang Batu OH 1.4500 115,000 166,750
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1000 125,000 12,500
311,250
Tenaga Kerja
1 Pekerja OH 0.0360 95,000 3,420
2 Tukang Batu OH 0.0600 115,000 6,900
3 Kepala Tukang Batu OH 0.0060 120,000 720
4 Mandor OH 0.0018 125,000 225
11,265
Tenaga Kerja
1 Pekerja OH 0.0540 95,000 5,130
2 Tukang Batu OH 0.0900 115,000 10,350
3 Kepala Tukang Batu OH 0.0090 120,000 1,080
4 Mandor OH 0.0027 125,000 338
16,898
Tenaga Kerja
1 Pekerja OH 0.8100 95,000 76,950
2 Tukang Batu OH 0.1350 115,000 15,525
3 Kepala Tukang Batu OH 0.0135 120,000 1,620
4 Mandor OH 0.0041 125,000 513
94,608
Tenaga Kerja
1 Pekerja OH 0.0100 95,000 950
2 Tukang Batu OH 0.1000 115,000 11,500
3 Kepala Tukang Batu OH 0.0100 120,000 1,200
4 Mandor OH 0.0005 125,000 63
13,713
Tenaga Kerja
1 Pekerja OH 0.0100 5,000 50
2 Tukang Batu OH 0.1000 185,000 18,500
3 Kepala Tukang Batu OH 0.0100 4,500 45
4 Mandor OH 0.0005 400 0
18,595
H. ANALISA HARGA SATUAN PEKERJAAN INSTALASI LISTRIK
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
Tenaga Kerja
1 Biaya Pemasangan Ls 1.0000 1,500,000 1,500,000
I. ANALISA HARGA SATUAN PEKERJAAN LANTAI & DINDING KERAMIK
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.3500 115,000 40,250
3 Kepala Tukang Batu OH 0.0350 120,000 4,200
4 Mandor OH 0.0300 125,000 3,750
107,100
Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.3500 115,000 40,250
3 Kepala Tukang Batu OH 0.0350 120,000 4,200
4 Mandor OH 0.0300 125,000 3,750
107,100
Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.4500 115,000 51,750
3 Kepala Tukang Batu OH 0.0450 120,000 5,400
4 Mandor OH 0.0300 125,000 3,750
119,800
J. ANALISA HARGA SATUAN PEKERJAAN KUSEN, PINTU DAN JENDELA
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )
J. 1 PEKERJAAN KUSEN
J. 1.1 Tiap 1 M3 Pasang Kusen Pintu Dan Jendela Kayu 5,850,000
Bahan
1 Balok Kayu Kelas II M3 1.1000 2,400,000 2,640,000
2 Paku Biasa 3-5 cm Kg 1.2500 22,000 27,500
3 Lem Kayu Kg 1.0000 35,000 35,000
2,702,500
Tenaga Kerja
1 Pekerja OH 6.0000 95,000 570,000
2 Tukang OH 20.0000 115,000 2,300,000
3 Kepala Tukang OH 2.0000 120,000 240,000
4 Mandor OH 0.3000 125,000 37,500
3,147,500
J. 2 PEMASANGAN PINTU
J. 2.1 Tiap 1 M2 Pemasangan Daun Pintu Kayu Kelas II 1,418,750
Bahan
1 Pintu Meranti 80-100 x 200 Bh 1.0000 1,000,000 1,000,000
Tenaga Kerja
1 Pekerja OH 1.0000 95,000 95,000
2 Tukang Kayu OH 2.5000 115,000 287,500
3 Kepala Tukang Kayu OH 0.2500 120,000 30,000
4 Mandor OH 0.0500 125,000 6,250
418,750
J. 2.2 Tiap 1 Buah Pemasangan Pintu UPVC untuk Kamar Mandi 1,385,310
Bahan
1 Pintu UPVC satu set Bh 1.0000 950,000 950,000
2 Perlengkapan - 0.1200 950,000 114,000
3 Indocement Portland 50 kg Kg 6.0000 1,360 8,160
4 Pasir Pasang M3 0.0100 190,000 1,900
1,074,060
Tenaga Kerja
1 Pekerja OH 1.2000 95,000 114,000
2 Tukang Batu OH 1.4500 115,000 166,750
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1000 125,000 12,500
311,250
J. 3 PEMASANGAN JENDELA
J. 3.1 Tiap 1 M2 Pasang Daun Jendela Kaca Kelas II 403,100
Bahan
1 Kayu Meranti Papan Kelas II M3 0.0240 2,400,000 57,600
2 Lem Kayu Kg 0.3000 35,000 10,500
68,100
Tenaga Kerja
1 Pekerja OH 0.8000 95,000 76,000
2 Tukang Kayu OH 2.0000 115,000 230,000
3 Kepala Tukang Kayu OH 0.2000 120,000 24,000
4 Mandor OH 0.0400 125,000 5,000
335,000
Tenaga Kerja
1 Pekerja OH 0.0600 95,000 5,700
2 Tukang Kayu OH 0.6000 115,000 69,000
3 Kepala Tukang Kayu OH 0.0600 120,000 7,200
4 Mandor OH 0.0030 125,000 375
82,275
Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575
Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0005 125,000 63
22,263
Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575
Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0100 125,000 1,250
28,550
Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0100 125,000 1,250
28,550
Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575
Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Cat OH 0.0630 115,000 7,245
3 Kepala Tukang Cat OH 0.0063 120,000 756
4 Mandor OH 0.0025 125,000 313
10,214
Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Mandor OH 0.0060 125,000 750
10,250
K. 2.2 1 M2 Cat Bidang Kayu Baru (1 lps Plamir), 1 lps cat dasar, 3 lps cat penutup 55,318
Bahan
1 Cat Meni Kayu Kg 0.2000 61,000 12,200
2 Plamir Kayu Damex Kg 0.1500 15,000 2,250
3 Cat Kayu Avian Kg 0.3500 61,000 21,350
35,800
Tenaga Kerja
1 Pekerja OH 0.0700 95,000 6,650
2 Tukang Cat OH 0.1050 115,000 12,075
3 Kepala Tukang Cat OH 0.0040 120,000 480
4 Mandor OH 0.0025 125,000 313
19,518
L. 1 PEKERJAAN LUAR
L. 1.1 Pekerjaan Septictank (Lumpsum) 3,500,000
Bahan
1 Septictank Biotech Bh 1.0000 2,000,000 2,000,000
Tenaga Kerja
1 Tukang Ls 1.0000 1,500,000 1,500,000
Tenaga Kerja
1 Tukang Ls 1.0000 2,150,000 2,150,000
RENCANA ANGGARAN BIAYA
Pekerjaan : Rumah Tinggal Type 36/60
Lokasi : Jl. Raya Menuju Surga, Gg. Ikhlas Bersedekah, No. 1
Tahun : 2020
No Uraian Pekerjaan Analisa Harga Satuan (AHS)
Volume Sat Harga Satuan (Rp.) Jumlah (Rp.)
A PEKERJAAN PERSIAPAN
A.1 Pekerjaan persiapan
A.1.1 Pembersihan Lokasi 60.0000 M2 15,750.00 945,000.00
1
A.1.2 Pengukuran dan Pemasangan Bouwplank 32.0000 M 90,179.00 2,885,728.00
A.1.3 Air Kerja 1.0000 Ls 5,000,000.00 5,000,000.00
TOTAL 8,830,728.00
B PEKERJAAN PONDASI
B.1 Pekerjaan Galian Tanah
B.1.1 Galian Tanah 35.2000 M3 74,375.00 2,618,000.00
3
B.1.2 Urugan Tanah Kembali 26.8800 M 24,791.67 666,400.00
3
B.1.3 Pasir Urug 3.5600 M 233,750.00 832,150.00
3
B.1.4 Pemadatan Tanah 26.8800 M 52,197.92 1,403,080.00
TOTAL 5,519,630.00
B.2 Pekerjaan Pondasi Batu Kali
B.2.1 Pasangan Pondasi Aanstamping 5.2800 M3 350,505.00 1,850,666.40
B.2.2 Pasangan Pondasi Batu Kali 11.8800 M3 703,035.00 8,352,055.80
TOTAL 10,202,722.20
C PEKERJAAN BETON
C.3.1 Sloof 15 x 20 1.3200 M3 4,201,683.66 5,546,222.43
3
C.3.2 Kolom 15 x 20 1.2600 M 4,814,037.47 6,065,687.21
C.3.3 Balok 15 x 20 1.0800 M3 7,053,955.66 7,618,272.11
C.3.4 Meja Beton Bertulang 0.0960 M3 4,292,165.80 412,047.92
TOTAL 19,642,229.67
D PEKERJAAN DINDING
D.1 Pekerjaan Pasangan Dinding
D.1.1 Pasangan Dinding 1/2 Bata (1:5) 113.9000 M2 90,273.00 10,282,094.70
2
D.1.2 Pasangan Dinding 1 Bata (1:5) 0.0000 M 190,700.00 -
TOTAL 10,282,094.70
D.2 Pekerjaan Plesteran
D.2.1 Plasteran Dinding (1:3) 152.9000 M2 52,223.60 7,984,988.44
2
D.2.2 .Plasteran Dinding (1:4) 0.0000 M 48,820.00 -
TOTAL 7,984,988.44
D.3 Pekerjaan Acian
D.3.1 Acian 152.9000 M2 31,525.00 4,820,172.50
TOTAL 4,820,172.50
F PEKERJAAN PLAFOND
F.1 Pekerjaan Rangka Plafond
F.1.1 Pekerjaan Rangka Plafond 36.0000 M2 103,345 3,720,420.00
TOTAL 3,720,420.00
F.2 Pemasangan Plafond
F.2.1 Pemasangan Plafond 36.0000 M2 46,385 1,669,860.00
TOTAL 1,669,860.00
F.3 Pemasangan List Plafond
F.3.1 Pemasangan List Plafond 36.0000 M1 37,945 1,366,020.00
TOTAL 1,366,020.00
G PEKERJAAN SANITASI
G.1 Pemasangan Kloset Duduk
G.1.1 Pemasangan Kloset Duduk 1 Bh 1,575,054 1,575,054.00
TOTAL 1,575,054.00
G.2 Pemasangan Floor Drain
G.2.1 Pemasangan Floor Drain 1 Bh 49,275 49,275.00
TOTAL 49,275.00
G.3 Pemasangan Bak Cuci Piring
G.3.1 Pemasangan Bak Cuci Piring 1 Bh 288,975 288,975.00
TOTAL 288,975.00
G.4 Pemasangan Wastafel
G.4.1 Pemasangan Wastafel 1.0000 Bh 1,061,250.00 1,061,250.00
TOTAL 1,061,250.00
G.5 Pemasangan Pipa Air PVC
G.5.1 Memasang Pipa PVC Diameter 1/2'' 20.0000 M1 20,565.00 411,300.00
1
G.5.2 Memasang Pipa PVC Diameter 3/4'' 18.0000 M 28,522.50 513,405.00
G.5.3 Memasang Pipa PVC Diameter 3'' 19.0000 M1 133,357.50 2,533,792.50
TOTAL 3,458,497.50
G.6 Pemasangan Kran Air
G.6.1 Memasang 1 Buah Kran Air 5.0000 Bh 48,787.50 243,937.50
G.6.2 Memasang 1 Buah Shower Set 1.0000 Bh 1,618,670.20 1,618,670.20
TOTAL 1,862,607.70
K PEKERJAAN PENGECATAN
K.1. Pengecatan Tembok Baru
K.1.1 Pengecatan Tembok Baru 152.9000 M2 19,968.50 3,053,183.65
TOTAL 3,053,183.65
K.2. Pengecatan Bidang Kayu
K.2.1 Pelaburan Bidang Kayu Dengan Residu dan Teer 55.6560 M2 22,850.00 1,271,739.60
2
K.2.2 Pengecatan Bidang Kayu Baru 122.9548 M 55,317.50 6,801,549.38
TOTAL 8,073,288.98
1 2 3
A PEKERJAAN PERSIAPAN 8,830,728.00
TERBILANG :