Anda di halaman 1dari 47

RINCIAN KEBUTUHAN BAHAN BANGUNAN / MATERIAL

HARGA
KELOMPOK No. URAIAN SATUAN
SATUAN BAHAN
1 2 3 4 5

A UPAH TENAGA KERJA


1 Mandor OH Rp. 125,000
2 Kepala Tukang OH Rp. 120,000
3 Tukang OH Rp. 115,000
4 Pekerja OH Rp. 95,000

B BAHAN/MATERIAL
1 Air Kerja Ls Rp. 5,000,000
2 Alkali Resisting Kg Rp. 60,000
3 Cat Dasar Dulux Catylac 4 Kg Kg Rp. 28,750
4 Cat Kayu Avian Kg Rp. 47,000
5 Cat Meni Kayu Kg Rp. 61,000
6 Cat Tembok Dulux Catylac 5 Kg Kg Rp. 23,000
7 American Standart Kloset Duduk Bh Rp. 1,265,000
8 Amplas Lbr Rp. 5,000
9 Anti Lumut Kg Rp. 90,000
10 Atap Genteng Kanmuri Milenio 32,2 x 31,7 cm Bh Rp. 9,500
11 AW Pipa PVC Ø 1" M Rp. 10,000
12 AW Pipa PVC Ø 1/2" M Rp. 6,000
13 AW Pipa PVC Ø 3/4" M Rp. 7,500
14 AW Pipa PVC Ø 3" M Rp. 25,000
15 Batu Apung Kg Rp. 10,300
16 Batu Bata Merah Bh Rp. 400
17 Batu Batako 10/20/40 Bh Rp. 4,500
18 Batu Kali M3 Rp. 185,000
19 Baut Engsel/Teralis Bks Rp. 5,000
20 Baut Ø12-15 Bh Rp. 15,000
21 Baut Ø16-20 Bh Rp. 17,500
22 Belucci Kunci type hYPO-NP Bh Rp. 240,000
23 Besi Polos Ø 10 mm Kg Rp. 8,250
24 Besi Polos Ø 12 mm Kg Rp. 8,250
25 Besi Polos Ø 16 mm Kg Rp. 8,250
26 Besi Polos Ø 8 mm Kg Rp. 8,250
27 Besi Ulir Ø 10 mm Kg Rp. 8,250
28 Besi Ulir Ø 12 mm Kg Rp. 8,250
29 Besi Ulir Ø 16 mm Kg Rp. 8,250
30 Besi Ulir Ø 8 mm Kg Rp. 8,250
31 Besi Strip Kg Rp. 10,684
32 Bubungan (Nok) Genteng Kanmuri Bh Rp. 50,000
33 Keramik Lt Kamar Mandi Kasar 30x30 KIA Coral M2 Rp. 58,000
34 Falco Engsel Jendela 3" Bh Rp. 21,000
35 Falco Engsel Pintu 5 " Bh Rp. 50,000
36 Grendel Jendela Bh Rp. 12,000
37 Grendel Pintu / Expagnolet Unit Rp. 54,000
38 Gypsum lbr Rp. 135,000
39 Hak Angin 10 inch Bh Rp. 38,500
40 Keramik lantai Polos 30x30 Asia Tile Murano M2 Rp. 40,000
41 Impra Dempul Kg Rp. 23,750
42 Impresso Keramik 30x30 Bh Rp. 4,409
43 Indocement Portland 50 kg Kg Rp. 1,360
44 Jendela Kaca/Jalusi Miring Set Rp. 353,000
45 Kaca Bening t = 5 mm M2 Rp. 92,500
46 Kaca Hitam t = 5 mm Bh Rp. 68,500
47 Kalsiboard Ling 3,5 mm, Ukuran 1,2 x 2,4 m Lbr Rp. 56,750
48 Kawat Bendrad Kg Rp. 20,000
49 Kawat Beton Kg Rp. 25,000
50 Kawat Duri 30 meter M' Rp. 4,833
51 Kayau Borneo Balok 5/7 Kelas III M3 Rp. 1,600,000
3
52 Kayau Borneo Balok 6/12 kelas III M Rp. 1,800,000
53 Kayu Meranti Balok 6/12 Kelas II M3 Rp. 2,400,000
3
54 Kayu Meranti Papan 3/20 M Rp. 2,400,000
3
55 Kayu Bengkirai Balok 6/12 kelas I M Rp. 10,750,000
56 Kayu Bengkirai Papan 4/20 keas I M3 Rp. 9,750,000
57 kayu Dolken Galam Ø 8 -10/4 m Btg Rp. 25,000
58 Kayu Jati Balok 6/12 Kls. 1 M3 Rp. 18,700,000
3
59 Kayu Meranti Kaso 4/6 M Rp. 2,000,000
3
60 Kayu Meranti Reng 3/4 M Rp. 2,000,000
61 Kerikil Beton M3 Rp. 210,000
62 Kia Keramik 40x40 Bh Rp. 12,500
63 Kia Polos Keramik 20x20 M2 Rp. 45,700
64 Kran Air Bh Rp. 35,000
65 Kuas 4" Bh Rp. 17,000
66 Kusen Meranti M' Rp. 95,750
67 Lambersering meranti M' Rp. 20,000
68 Lexus Westafel Bh Rp. 360,000
69 List Gypsum Type C7 M' Rp. 6,000
70 List Profil Kayu M' Rp. 25,000
71 Lock Window Bh Rp. 45,000
72 Minyak Bekisting Ltr Rp. 20,000
73 Nicole Kunci Set Rp. 124,500
74 Nok Surya Roof 100 mm Bh Rp. 40,000
75 Nok Surya Roof 33 mm Bh Rp. 22,000
76 Paku Biasa 2" - 5" Kg Rp. 22,000
77 Paku Sekrup Kg Rp. 45,000
78 Paku Ulin 1" - 5" Kg Rp. 38,000
79 Paragon Plamir 5 Kg Kg Rp. 9,000
80 Pasir Cor/Beton M3 Rp. 284,000
3
81 Pasir Pasang M Rp. 190,000
3
82 Pasir urug M Rp. 170,000
83 Pemasangan Listrik 1.300 VA Ls Rp. 2,165,000
84 Perlatan Kecil Ls Rp. 174,500
85 T-Dos (Kontak Hubung Bagi) Bh Rp. 5,500
86 Pintu Meranti 80-100 x 200 Bh Rp. 1,000,000
87 Triplek t = 6 mm, 122 x 244 Lbr Rp. 69,000
88 Triplek t = 9 mm Lbr Rp. 98,000
89 Triplek t =3 mm Lbr Rp. 44,000
90 Pujatex Cat Minyak Kg Rp. 35,000
91 Toren/Tangki Air 1200 L Bh Rp. 1,350,000
92 Rol Cat Bh Rp. 29,000
93 Semen Warna Kg Rp. 11,000
94 Seng Gelombang BJLS 32 Lbr Rp. 116,000
95 Sirtu M3 Rp. 90,000
96 Talang Air PVC Btg Rp. 68,000
97 Tanah Urug M3 Rp. 200,000
98 Teralis Pengaman jendela Bh Rp. 250,000
99 Toto Kloset Jongkok Bh Rp. 290,000
100 Tonasa Semen Portland 50 kg Kg Rp. 1,100
101 Bak Cuci Piring Stainless 75 x 40 Cm Bh Rp. 235,000
102 Tulangan Bh Rp. 8,250
103 Floor Drain Bh Rp. 35,000
104 Water Drain dan Asesories Bh Rp. 55,000
105 Pipa PVC Listrik M' Rp. 1,625
106 Saklar Tunggal Bh Rp. 10,000
107 Kabel NYY 2.5 mm2 M Rp. 16,000
108 Kabel NYY 1.5 mm2 M Rp. 11,000
109 Lampu LED Philips 20W Bh Rp. 38,000
110 Fitting Lampu Bh Rp. 7,000
111 Inbouw Doss Bh Rp. 7,500
112 Perlengkapan (Isolasi, Paku, Klem, Samb) set Rp. 34,000
113 Stop Kontak Bh Rp. 24,000
114 Lampu TL Philips Lengkap 40 W Bh Rp. 100,000
115 Box MCB Bh Rp. 75,000
116 Seng Plat BJLS 30 Lbr Rp. 48,000
117 MCB 6A Bh Rp. 44,000
118 Sewa Stamper Hari Rp. 12,292
119 Lem Kayu Presto DN Galon (4 Kg) Kg Rp. 35,000
120 Wastafel Toto Bh Rp. 750,000
121 Peralatan Kecil Pemasangan Listrik Ls Rp. 100,000
122 Biaya Pemasangan Listrik Ls Rp. 1,500,000
123 Bak Mandi (Bathtub) Fibreglass Bh Rp. 2,350,000
124 Seal Tape Bh Rp. 3,000
125 TOTO Umi Single Lever Shower Set Bh Rp. 1,600,000
126 Pintu UPVC satu Set Bh Rp. 950,000
127 Teer Anti Rayap Oles 5,5 Liter Ltr Rp. 36,000
128 Plamir Kayu Damex 5Kg Kg Rp. 15,000
129 Septictank Biotech Bh Rp. 2,000,000
MENGHITUNG VOLUME PEKERJAAN

A PEKERJAAN PERSIAPAN
A.1 PEKERJAAN PERSIAPAN
- PEMBERSIHAN SITE ATAU LOKASI LAHAN
VOL = PANJANG LAHAN X LEBAR LAHAN
= 10 X 6
= 60
- PENGUKURAN DAN PEMASANGAN BOWPLANK
VOL = [ ( PANJANG BANGUNAN + 2 ) X 2 ] + [ ( LEBAR BANGUNAN + 2 ) X 2 ]
= 6 + 2 = 8 X 2 = 16
= 6 + 2 = 8 X 2 = 16
= 32
- PEKERJAAN AIR KERJA
VOL = 1 Lumpsum (Ls)

B PEKERJAAN PONDASI
B.1 PEKERJAAN GALIAN TANAH
- GALIAN TANAH
VOL = PJG GALIAN X TINGGI GALIAN X LEBAR GALIAN
= 44 X 1 X 0.8
= 35.20

- URUGAN PASIR BAWAH PONDASI


VOL = TEBAL URUGAN X LEBAR URUGAN X PANJANG URUGAN
= 0.05 X 0.8 X 44
= 1.76

- URUGAN PASIR BAWAH LANTAI


VOL = TINGGI X LUAS LANTAI
= 0.05 X 36
= 1.80

VOL TOTAL URUGAN PASIR = 3.56

- URUGAN TANAH KEMBALI


VOL = VOLUME GALIAN TANAH - VOLUME PASANGAN BATU KALI + VOLUME URUGAN PASIR
= 35.20 - 11.88 + 3.56
= 26.88
B.2 PASANGAN PONDASI BATU KALI
- AANSTAMPING
VOL = PANJANG PASANGAN X TINGGI PASANGAN X LEBAR PASANGAN
= 44 X 0.15 X 0.8
= 5.28

- PASANGAN PONDASI BATU KALI


VOL = LEBAR BAWAH PONDASI + LEBAR ATAS PONDASI / 2 X TINGGI X PANJANG
= 0.6 + 0.3 / 2 X 0.6 X 44
= 11.88

C PEKERJAAN DINDING
C.3 PEKERJAAN BETON BERTULANG
- VOLUME SLOOF
VOL = PANJANG SLOOF X LUAS PENAMPANG SLOOF = PANJANG GALIAN X TINGGI X LEBAR SLOOF
= X = 44 X 0.2 X 0.15
= 1.32

- VOLUME KOLOM 15 x 20
VOL = TINGGI KOLOM X LUAS PENAMPANG KOLOM = TINGGI KOLOM X PANJANG X LEBAR KOLOM X JUMLAH KOLOM
= 3 X 0.15 X 0.2 X 14
= 1.26

- VOLUME BALOK 15 x 20
VOL = PANJANG BALOK X LUAS BALOK X TINGGI BALOK
= 36 X 0.15 X 0.2
= 1.08

- VOLUME BETON MEJA DAPUR


VOL = TEBAL BETON X LUAS PENAMPANG MEJA BETON
= 0.08 X 1.2
= 0.096
D PEKERJAAN BETON
D.1 PEKERJAAN PASANGAN DINDING
- PASANGAN DINDING BATA MERAH ( SEMEN 1 : PASIR 5 )
LUAS KUSEN PINTU = 0.85 X 2.25 X 4 Buah = 7.65
LUAS KUSEN JENDELA = 0.5 X 1.75 X 6 Buah = 5.25
LUAS DINDING SOPI2 = 10.8 / 2 X 2 Buah = 10.8
PJG DINDING BANG = = 36
TINGGI DINDING = = 3
PJG DINDING PAGAR = = 8
TINGGI DINDING PAGAR = = 1
VOL (M2) = (( 36 X 3) + 10.8 ) - ( 7.65 + 5.25 ) + (8 X 1)
= 114

D.2 PEKERJAAN PLESTERAN DAN ACIAN


- * PLESTERAN UNTUK DINDING BANGUNAN BIASA ( SEMEN 1 : PASIR 3 ) SATU SISI
VOL (M2) = [ ( TINGGI DINDING YANG DIPLESTER X PANJANG DINDING ) - LUAS LUBANG PINTU DAN JENDELA ]
= 3 X 18 - 12.90
= 41.1

* PLESTERAN UNTUK DINDING PAGAR BIASA ( SEMEN 1 : PASIR 3 ) DUA SISI


VOL (M2) = [ (( TINGGI DINDING YANG DIPLESTER X PANJANG DINDING )
= 1 X 8
= 8

VOL (M2) PLESTERAN DINDING SATU SISI = 49.1

- * PLESTERAN UNTUK DINDING BANGUNAN BIASA ( SEMEN 1 : PASIR 3 ) DUA SISI


VOL (M2) = [ (( TINGGI DINDING YANG DIPLESTER X PANJANG DINDING ) + 10.8 )) - LUAS LUBANG PINTU DAN JENDELA ] X 2
= 3 X 18 + 11 - 12.90 ] X 2
= 103.8

VOL (M2) PLESTERAN DINDING KESELURUHAN = 152.9


D.3 PEKERJAAN ACIAN
- * ACIAN UNTUK DINDING BANGUNAN BIASA ( SEMEN 1 : PASIR 3 ) SATU SISI
VOL (M2) = [ ( TINGGI DINDING YANG DIACI X PANJANG DINDING ) - LUAS LUBANG PINTU DAN JENDELA ]
= 3 X 18 - 12.90
= 41.1

* ACIAN UNTUK DINDING PAGAR BIASA ( SEMEN 1 : PASIR 3 ) DUA SISI


VOL (M2) = [ (( TINGGI DINDING YANG DIACI X PANJANG DINDING )
= 1 X 8
= 8

VOL (M2) ACIAN DINDING SATU SISI = 49.1

- * ACIAN UNTUK DINDING BANGUNAN BIASA ( SEMEN 1 : PASIR 3 ) DUA SISI


VOL (M2) = [ (( TINGGI DINDING YANG DIACI X PANJANG DINDING ) + 10.8 )) - LUAS LUBANG PINTU DAN JENDELA ] X 2
= 3 X 18 + 11 - 12.90 ] X 2
= 103.8

VOL (M2) ACIAN DINDING KESELURUHAN = 152.9


E PEKERJAAN KUDA-KUDA DAN ATAP
E.1 PEKERJAAN KAYU KAP DAN RANGKA ATAP
- * KUDA - KUDA
VOL (M3) = PANJANG KUDA2 X LUAS PENAMPANG BALOK
= 18.3 X 0.0072
= 0.13 X 3 BUAH
VOL (M3) KES = 0.40

- * GORDING DAN NOK KAYU


VOL (M3) = LUAS PENAMPANG KAYU X PANJANG KAYU
= 0.0072 X 40
= 0.288

- * KASO DAN RENG


VOL (M2) = JUMLAH LUAS PENAMPANG ATAP
= 56

- * LISPLANK KAYU (DEPAN & BELAKANG)


VOL (M) = JUMLAH PANJANG LISPLANK
= 14

- * TALANG DATAR SENG


VOL (M) = JUMLAH PANJANG TALANG
= 30

E.2 PEKERJAAN PENUTUP ATAP


- * ATAP GENTING
VOL (M2) = LUAS PENAMPANG BIDANG ATAP
= 56

- * BUBUNGAN GENTING
VOL (M) = PANJANG BALOK NOK YANG AKAN DITUTUPI BUBUNGAN GENTING
= 8
F PEKERJAAN PLAFOND
F.1 PEKERJAAN RANGKA PLAFOND KAYU
- * RANGKA PLAFON
VOL (M2) = JUMLAH LUAS RUANGAN YANG AKAN DIPASANGI PLAFON
= 36

F.2 PASANGAN PLAFOND


- * PLAFON
VOL (M2) = JUMLAH LUAS RUANGAN YANAG AKAN DIPASANGI PLAFON TRIPLEK/GYPSUM
= 36

F.3 PASANGAN LIST PLAFOND


- * LIS PLAFON ( KAYU/GYPSUM )
VOL (M1) = JUMLAH PANJANG DINDING YANG AKAN DIPASANGI LIS PLAFON
= 36
G PEKERJAAN SANITASI
G.1 PEMASANGAN 1 BUAH KLOSET DUDUK
- * KLOSET DUDUK
VOL (BH) = JUMLAH KLOSET
= 1 BH

G.2 PEMASANGAN 1 BUAH FLOOR DRAIN


- * FLOOR DRAIN
VOL (BH) = JUMLAH FLOOR DRAIN
= 1 BH

G.3 PEMASANGAN 1 BUAH KITCHEN SINK


- * KITCHEN SINK
VOL (BH) = JUMLAH KITCHEN SINK
= 1 BH

G.4 PEMASANGAN 1 BUAH WASTAFEL


- * WASTAFEL
VOL (BH) = JUMLAH WASTAFEL
= 1 BH

G.5 PEMASANGAN PIPA AIR PVC


- VOLUME PIPA AIR BERSIH DIAMETER 1/2'' 20 M'
- VOLUME PIPA AIR PEMBUANGAN DIAMETER 3/4'' 18 M'
- VOLUME PIPA SALURAN SEPTICTANK DIAMETER 3'' 19 M'

G.6 PEMASANGAN KERAN AIR


- VOLUME KRAN AIR 5 Bh
- VOLUME SHOWER SET 1 Bh
H PEKERJAAN INSTALASI LISTRIK
H.1 PEMASANGAN INSTALASI LISTRIK
- Philips Lampu TL Lengkap 2 Bh
- Lampu LED Philips 20 W 5 Bh
- Fitting Lampu 5 Bh
- Saklar Tunggal 7 Bh
- Stop Kontak 12 Bh
- MCB 6 A 2 Bh
- Kotak ( Box) MCBN 1 Bh
- T-Dos (Kontak Hubung Bagi) 7 Bh
- Kabel 3 x 2,5 50 M'
- Pipa PVC (Pipa Listrik) 50 M'
- KWH (Pasang Baru) 1 Ls
- Alat Kecil 1 Ls

I PEKERJAAN LANTAI KERAMIK DAN DINDING KERAMIK


I.1 PEMASANGAN LANTAI KERAMIK
- PEMASANGAN LANTAI KERAMIK 33 M2
- PEMASANGAN LANTAI KERAMIK KAMAR MANDI 3 M2

I.2 PEMASANGAN DINDING KERAMIK KAMAR MANDI


- PEMASANGAN DINDING KERAMIK KAMAR MANDI 6.15 M2

J PEKERJAAN KUSEN, PINTU DAN JENDELA


J.1 PEMASANGAN KUSEN
- * KUSEN KAYU
VOL (M3) = LUAS PENAMPANG KAYU X PANJANG KAYU
0.0072 X 54.6
VOL (M3) = 0.393

J.2 PEMASANGAN PINTU


* DAUN PINTU PANEL KAYU
VOL (Ls) = DAUN PINTU PANEL KAYU
= 3

* DAUN PINTU UPVC (KAMAR MANDI)


VOL (Ls) = DAUN PINTU UPVC (KAMAR MANDI)
= 1

J.3 PEMASANGAN JENDELA


* DAUN JENDELA KAYU
VOL (M2) = LEBAR DAUN JENDELA X TINGGI DAUN JENDELA X JUMLAH JENDELA
= 0.5 1.75 6
= 5.25

J.4 PEKERJAAN KUNCI DAN KACA


- Pemasangan Kunci Tanam = 3 Bh
- Pemasangan Engsel Pintu = 9 Bh
- Pemasangan Engsel Jendela = 24 Bh
- Pemasangan Hak / Kait Angin = 8 Bh
- Pemasangan Grendel Jendela = 8 Bh
- Pemasangan Grendel Pintu = 3 Bh
- Pemasangan Kaca Jendela = 5.6112 M2
K PEKERJAAN PENGECATAN
K.1 PENGECATAN TEMBOK BARU
- * PENGECATAN DINDING
VOL (M2) = SAMA DENGAN LUAS ACIAN
= 152.9

K.2 PENGECATAN BIDANG KAYU


* PELABURAN BIDANG KAYU DENGAN RESIDU DAN TEER
- PELABURAN RANGKA PLAFOND KAYU
VOL (M2) = JUMLAH LUAS RANGKA PLAFOND KAYU YANG DILABURI
= 36
- PELABURAN KUSEN KAYU
VOL (M2) = KELILING BIDANG KAYU KUSEN YANG DILABURI X PANJANG KAYU
= 0.36 X 54.6
= 19.66
TOTAL VOL (M2) = 55.66

* PENGECATAN BIDANG KAYU BARU


- PENGECATAN RANGKA PLAFOND KAYU
VOL (M2) = JUMLAH LUAS RANGKA PLAFOND KAYU YANG DILABURI
= 36
- PENGECATAN PLAFOND
VOL (M2) = JUMLAH LUAS PLAFOND YANG DICAT
= 36
- PENGECATAN LIST PLAFOND
VOL (M2) = LUAS BIDANG LIST PLAFOND YANG DICAT X PANJANG KAYU
= 0.0025 33.5
= 0.084
- PENGECATAN LISPLANK KAYU
VOL (M2) = KELILING BIDANG KAYU LISPLANK YANG DICAT X PANJANG LISPLANK
= 0.66 X 14
= 9.24
- PENGECATAN KUSEN KAYU
VOL (M2) = KELILING BIDANG KAYU KUSEN YANG DICAT X PANJANG KAYU
= 0.36 X 54.6
= 19.66
- PENGECATAN DAUN PINTU
VOL (M2) = LUAS PENAMPANG DAUN PINTU X 2 X JUMLAH PINTU
= 1.9125 X 2 X 3
= 11.48

- PENGECATAN DAUN JENDELA


VOL (M2) = L PENAMPANG DAUN JENDELA X 2 X JUMLAH JENDELA
= 0.875 X 2 X 6
= 10.5
TOTAL VOL (M2) = 123

L PEKERJAAN LUAR
L.1 PEKERJAAN PERLENGAPAN LUAR
- Pekerjaan Septictank = 1 Ls
- Pekerjaan Toren = 1 Ls
VOLUME PEKERJAAN
NO URAIAN PEKERJAAN VOLUME SAT
A PEKERJAAN PERSIAPAN
A.1 Pekerjaan Persiapan
A.1.1. Pembersihan Lapangan 60.0000 M2
A.1.2. Pemasangan Bouplank/Pengukuran 32.0000 M
A.1.3. Pengadaan Air Kerja 1.0000 Ls

B PEKERJAAN PONDASI
B.1. Pekerjaan Galian Tanah
B.1.1. Galian Tanah Keras 1 Meter 0.0000 M3
B.1.2. Galian Tanah Biasa 1 Meter 35.2000 M3
B.1.3. Urugan Tanah Kembali 26.8800 M3
B.1.4. Urugan Pasir 3.5600 M3
B.1.5. Pemadatan Tanah 26.8800 M3

B.2. Pemasangan Pondasi Batu Kali


B.2.1. Pasangan Pondasi Batu Kosong (Aanstamping) 5.2800 M3
B.2.2. Pasangan Pondasi Batu Kali 11.8800 M3

C PEKERJAAN BETON
C.3. Beton Bertulang
C.3.1. Sloof 15 x 20 1.3200 M3
C.3.2. Kolom 15 x 20 1.2600 M3
C.3.3. Balok 15 x 20 1.0800 M3
C.3.4. Meja Beton Bertulang 0.0960 M3

D PEKERJAAN DINDING
D.1. Dinding
D.1.1. Pasangan Dinding 1/2 Bata (1:5) 113.9000 M2
D.1.2. Pasangan Dinding 1 Bata (1:5) 0.0000 M2

D.2. Plasteran
D.2.1. Plasteran Dinding (1:3) 152.9000 M2
D.2.2. Plasteran Dinding (1:4) 0.0000 M2

D.3. Acian
D.3.1. Acian 152.9000 M2

E PEKERJAAN KUDA-KUDA DAN ATAP


E.1. Kap dan Rangka Atap
E.1.1. Pekerjaan Kuda-Kuda Kayu 0.3953 M3
E.1.2. Pekerjaan Gordeng 0.2880 M3
E.1.3. Pekerjaan Rangka Usuk / Reng 56.0000 M2
E.1.4. Pekerjaan Listplank 14.0000 M'
E.1.5. Pekerjaan Talang 30.0000 M'
E.2. Penutup Atap
E.2.1. Pemasangan Genteng 56.0000 M2
E.2.2. Pemasangan Bubungan 8.0000 M1

F PEKERJAAN PLAFOND
F.1. Rangka Plafond
F.1.1. Rangka Plafond 36.0000 M2

F.2. Memasang Plafond


F.2.1. Memasang Plafond 36.0000 M2

F.3. Memasang List Plafond


F.3.1. Memasang List Plafond 36.0000 M'

G PEKERJAAN SANITASI
G.1. Memasang 1 Buah Kloset Duduk
G.1.1. Memasang 1 Buah Kloset Duduk 1.0000 Bh

G.2. Memasang 1 Buah Floor Drain


G.2.1. Memasang 1 Buah Floor Drain 1.0000 Bh

G.3. Memasang 1 Buah Bak Cuci Piring


G.3.1. Memasang 1 Buah Bak Cuci Piring 1.0000 Bh

G.4. Memasang 1 Buah Wastafel


G.4.1. Memasang 1 Buah Wastafel 1.0000 Bh

G.5. Pemasangan Pipa Air PVC


G.5.1. Memasang Pipa PVC Diameter 1/2'' 20.0000 M'
G.5.2. Memasang Pipa PVC Diameter 3/4'' 18.0000 M'
G.5.3. Memasang Pipa PVC Diameter 3'' 19.0000 M'

G.6. Pemasangan Kran Air


G.6.1. Memasang 1 Buah Kran Air 5.0000 Bh
G.6.2. Memasang 1 Buah Shower Set 1.0000 Bh

H PEKERJAAN INSTALASI LISTRIK


H.1. Pekerjaan Instalasi Listrik
Philips Lampu TL Lengkap 2.0000 Bh
Lampu LED Philips 20 W 5.0000 Bh
Fitting Lampu 5.0000 Bh
Saklar Tunggal 7.0000 Bh
Stop Kontak 12.0000 Bh
MCB 6 A 2.0000 Bh
Kotak ( Box) MCBN 1.0000 Bh
T-Dos (Kontak Hubung Bagi) 7.0000 Bh
Kabel 3 x 2,5 50.0000 M'
Pipa PVC (Pipa Listrik) 50.0000 M'
KWH (Pasang Baru) 1.0000 Ls
Alat Kecil 1.0000 Ls

I PEKERJAAN LANTAI & DINDING KERAMIK


I.1. Pemasangan Lantai Keramik
I.1.1. Pemasangan Lantai Keramik 33.0000 M2
I.1.2. Pemasangan Lantai Keramik Kamar Mandi 3.0000 M2

I.2. Pemasangan Dinding Keramik Kamar Mandi


I.2.1. Pemasangan Dinding Keramik Kamar Mandi 6.1500 M2

J PEKERJAAN KUSEN, PINTU DAN JENDELA


J.1. Pekerjaan Kusen
J.1.1. Pekerjaan Kusen 0.3931 M3

J.2. Pemasangan Pintu


J.2.1. Pemasangan Daun Pintu Kayu 3.0000 M2
J.2.2. Pemasangan Daun Pintu UPVC (Kamar Mandi) 1.0000 Bh

J.3. Pemasangan Jendela


J.3.1. Pemasangan Daun Jendela Kaca 6.0000 M2
J.3.2. Pemasangan Jalusi Kayu 0.0000 M'

J.4. Pekerjaan Kunci Dan Kaca


J.4.1. Pemasangan Kunci Tanam 3.0000 Bh
J.4.2. Pemasangan Engsel Pintu 9.0000 Bh
J.4.3. Pemasangan Engsel Jendela 24.0000 Bh
J.4.4. Pemasangan Hak / Kait Angin 8.0000 Bh
J.4.5. Pemasangan Grendel Jendela 8.0000 Bh
J.4.6. Pemasangan Grendel Pintu 3.0000 Bh
J.4.7. Pemasangan Kaca Jendela 5.6112 M2

K PEKERJAAN PENGECATAN
K.1. Pengecatan Tembok Baru
K.1.1. Pengecatan Tembok Baru 152.9000 M2

K.2. Pengecatan Bidang Kayu


K.2.1. Pelaburan Bidang Kayu Dengan Residu dan Teer 55.6560 M2
K.2.2. Pengecatan Bidang Kayu Baru 122.9548 M2

L PEKERJAAN LUAR
L.1. Pekerjaan Perlengkapan Luar
L.1.1. Pekerjaan Septictank 1.0000 Ls
L.1.2. Pekerjaan Toren Dan Dudukan 1.0000 Ls
A. ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

A.1 PEKERJAAN PERSIAPAN


A. 1.1 Tiap 1 M2 Pembersihan Lapangan 15,750
1 Pekerja OH 0.1000 95,000 9,500
2 Mandor OH 0.0500 125,000 6,250
15,750

A. 1.2 Tiap 1 M' Pasangan Bouwplank 90,179


Bahan
1 Kayu Balok Kls III M3 0.0120 1,600,000 19,200
2 Papan Kayu Kls II M 3
0.0200 2,400,000 48,000
3 Paku Biasa 2"-5" Kg 0.0070 22,000 154
67,354
Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0050 125,000 625
22,825

A. 1.3 Air Kerja 5,000,000


1 Air Kerja Ls 1.0000 5,000,000 5,000,000

B. ANALISA HARGA SATUAN PEKERJAAN PONDASI


Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

B. 1 PEKERJAAN GALIAN TANAH


B. 1.1 Tiap 1 M3 Pekerjaan Galian Tanah Keras Sedalam 1M 99,000
1 Pekerja OH 1.0000 95,000 95,000
2 Mandor OH 0.0320 125,000 4,000
99,000

B. 1.2 1 M3 Pekerjaan Galian Tanah Biasa Sedalam 1M 74,375


1 Pekerja OH 0.7500 95,000 71,250
2 Mandor OH 0.0250 125,000 3,125
74,375

B. 1.3 Tiap 1 M3 Urugan Tanah Kembali (1/3 kali dari indeks galian tanah) 24,792

B. 1.4 Tiap 1 M3 Urugan Pasir 233,750


Bahan
1 Pasir Urug M3 1.2000 170,000 204,000

Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Mandor OH 0.0100 125,000 1,250
29,750

B. 1.5 Tiap 1 M3 Pekerjaan Pemadatan Tanah 52,198


1 Pekerja OH 0.5000 95,000 47,500
2 Mandor OH 0.0130 125,000 1,625
3 Sewa Stamper Jam 0.2500 12,292 3,073
52,198

B. 2 PEKERJAAN PONDASI BATU KALI


B. 2.1 Tiap 1 M3 Pasangan Pondasi Batu Kosong (Aanstamping) 350,505
Bahan
1 Batu Kali M3 1.2000 185,000 222,000
2 Pasir Urug M3 0.4320 170,000 73,440
295,440

Tenaga Kerja
1 Pekerja OH 0.7800 95,000 74,100
2 Tukang Batu OH 0.3900 115,000 44,850
3 Kepala Tukang Batu OH 0.0390 120,000 4,680
4 Mandor OH 0.0390 125,000 4,875
128,505

B. 2.2 Tiap 1 M3 Pasangan Pondasi Batu Kali (1:5) 703,035


Bahan
1 Batu Kali M3 1.2000 185,000 222,000
2 Tonasa Semen Portland 50 Kg Kg 136.0000 1,100 149,600
3 Pasir Pasang M3 0.5440 190,000 103,360
474,960

Tenaga Kerja
1 Pekerja OH 1.5000 95,000 142,500
2 Tukang Batu OH 0.6000 115,000 69,000
3 Kepala Tukang Batu OH 0.0600 120,000 7,200
4 Mandor OH 0.0750 125,000 9,375
228,075
C. ANACISA HARGA SATUAN PEKERJAAN BETON
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

C. 1 PEKERJAAN BEKISTING
C. 1.1 Tiap 1 M2 Pasangan Bekisting Untuk Sloof 142,745
Bahan
1 Balok Kayu Kls III M3 0.0450 1,600,000 72,000
2 Paku Biasa 3-5 cm Kg 0.3000 22,000 6,600
3 Minyak Bekiting Ltr 0.1000 20,000 2,000
80,600

Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang Kayu OH 0.2600 115,000 29,900
3 Kepala Tukang Kayu OH 0.0260 120,000 3,120
4 Mandor OH 0.0050 125,000 625
62,145

C. 1.2 Tiap 1 M2 Pasangan Bekisting Untuk Kolom 268,260


Bahan
1 Triplek 9 mm Lbr 0.3500 98,000 34,300
2 Balok Kayu Kelas II M 3
0.0150 2,400,000 36,000
3 Paku Biasa 3-5 cm Kg 0.4000 22,000 8,800
4 Minyak Bekiting Ltr 0.2000 20,000 4,000
5 Balok Kayu Kelas III M3 0.0400 1,600,000 64,000
6 Kayu Dolken Galam Ø 8 -10/4 m Btg 2.0000 25,000 50,000
197,100

Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
71,160

C. 1.3 Tiap 1 M2 Pasangan Bekisting Balok 277,360


Bahan
1 Balok Kayu Kelas III M3 0.0400 1,600,000 64,000
2 Paku Biasa 3-5 cm Kg 0.4000 22,000 8,800
3 Minyak Bekiting Ltr 0.2000 20,000 4,000
4 Balok Kayu Kelas II M3 0.0180 2,400,000 43,200
5 Triplek 9 mm Lbr 0.3500 98,000 34,300
6 Kayu Dolken Galam Ø 8 -10/4 m Btg 2.0000 25,000 50,000
204,300

Tenaga Kerja
1 Pekerja OH 0.3200 95,000 30,400
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
73,060

C. 1.4 Tiap 1 M2 Pasangan Bekisting Tangga 253,160


Bahan
1 Balok Kayu Kelas III M3 0.0300 1,600,000 48,000
2 Paku Biasa 3-5 cm Kg 0.4000 22,000 8,800
3 Minyak Bekiting Ltr 0.1500 20,000 3,000
4 Balok Kayu Kelas II M3 0.0150 2,400,000 36,000
5 Plywood 9 mm Lbr 0.3500 98,000 34,300
6 Kayu Dolken Galam Ø 8 -10/4 m Btg 2.0000 25,000 50,000
180,100

Tenaga Kerja
1 Pekerja OH 0.3200 95,000 30,400
2 Tukang Kayu OH 0.3300 115,000 37,950
3 Kepala Tukang Kayu OH 0.0330 120,000 3,960
4 Mandor OH 0.0060 125,000 750
73,060

C. 2 PEKERJAAN BETON
C. 2.1 Tiap 1 M3 Pembuatan Beton Mutu f'c=7,4 Mpa (K175) 874,942
Bahan
1 Tonasa Semen Portland 50 Kg Kg 326.0000 1,100 358,600
2 Pasir Beton M3 0.5430 284,000 154,212
3 Kerikil Beton M 3
0.7620 210,000 160,020
672,832

Tenaga Kerja
1 Pekerja OH 1.6500 95,000 156,750
2 Tukang OH 0.2750 115,000 31,625
3 Kepala Tukang OH 0.0280 120,000 3,360
4 Mandor OH 0.0830 125,000 10,375
202,110

C. 2.2 Tiap 1 M3 Pembuatan Beton Mutu f'c=19,3 Mpa (K225) 914,688


Bahan
1 Tonasa Semen Portland 50 Kg Kg 371.0000 1,100 408,100
2 Pasir Beton M3 0.4986 284,000 141,602
3 Kerikil Beton M 3
0.7756 210,000 162,876
712,578

Tenaga Kerja
1 Pekerja OH 1.6500 95,000 156,750
2 Tukang OH 0.2750 115,000 31,625
3 Kepala Tukang OH 0.0280 120,000 3,360
4 Mandor OH 0.0830 125,000 10,375
202,110

C. 3 BETON BERTULANG
C. 3.1 Tiap 1 M3 Untuk Sloof Beton Bertulang 15 x 20 cm 4,201,684
1 Beton K. 175 Mpa M3 1.0000 874,942 874,942
2 Bekisting Sloof M2 13.3333 142,745 1,903,262
3 Besi Beton Polos Kg 172.5430 8,250 1,423,480
4,201,684

C. 3.2 Tiap 1 M3 Untuk Membuat Kolom Beton Bertulang 15 x 20 cm 4,814,037


1 Beton K. 175 Mpa M3 1.0000 874,942 874,942
2 Bekisting Kolom M2 17.4560 142,745 2,491,757
3 Besi Beton Polos Kg 175.4350 8,250 1,447,339
4,814,037

C. 3.3 Tiap 1 M3 Untuk Membuat Balok Beton Bertulang 15 x 20 cm 7,053,956


1 Beton K. 175 Mpa M3 1.0000 874,942 874,942
2 Bekisting Balok M2 16.6667 277,360 4,622,676
3 Besi Beton Polos Kg 188.6470 8,250 1,556,338
7,053,956

C. 3.4 Tiap 1 M3 Untuk Membuat Meja Beton Bertulang tebal 8 cm 4,292,166


1 Beton K. 175 Mpa M3 1.0000 874,942 874,942
2 Bekisting Tangga M 2
9.0000 253,160 2,278,440
3 Besi Beton Polos Kg 138.0344 8,250 1,138,784
4,292,166
D. ANALISA HARGA SATUAN PEKERJAAN DINDING
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

D. 1 PEKERJAAN PASANGAN DINDING BATU BATA MERAH


D. 1.1 Tiap 1 M2 Pasangan Bata Merah Tebal 1/2 Bata. 1 Pc : 5 Ps 90,273
Bahan
1 Batu Bata Merah Kelas I Bh 70.0000 400 28,000
2 Tonasa Semen Portland 50 Kg Kg 9.6800 1,100 10,648
3 Pasir Pasang M3 0.0450 190,000 8,550
47,198

Tenaga Kerja
1 Pekerja OH 0.3000 95,000 28,500
2 Tukang OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0150 125,000 1,875
43,075

D. 1.2 Tiap 1 M2 Pasangan Bata Merah Tebal 1 Bata. 1 Pc : 5 Ps 190,700


Bahan
1 Batu Bata Merah Kelas I Bh 140.0000 400 56,000
2 Tonasa Semen Portland 50 Kg Kg 22.2000 1,100 24,420
3 Pasir Pasang M3 0.1020 190,000 19,380
99,800

Tenaga Kerja
1 Pekerja OH 0.6500 95,000 61,750
2 Tukang OH 0.2000 115,000 23,000
3 Kepala Tukang OH 0.0200 120,000 2,400
4 Mandor OH 0.0300 125,000 3,750
90,900

D. 2 PEKERJAAN PLESTERAN
D. 2.1 Tiap 1 M2 Plesteran 1 Pc : 3 Ps Tebal 15 mm 52,224
Bahan
1 Tonasa Semen Portland 50 Kg Kg 7.7760 1,100 8,554
2 Pasir Pasang M3 0.0230 190,000 4,370
12,924
Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang OH 0.1500 115,000 17,250
3 Kepala Tukang OH 0.0150 120,000 1,800
4 Mandor OH 0.0100 125,000 1,250
39,300

D. 2.2 Tiap 1 M2 Plesteran 1 Pc : 4 Ps Tebal 15 mm 48,820


Bahan
1 Tonasa Semen Portland 50 Kg Kg 5.2000 1,100 5,720
2 Pasir Pasang M3 0.0200 190,000 3,800
9,520

Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang OH 0.1500 115,000 17,250
3 Kepala Tukang OH 0.0150 120,000 1,800
4 Mandor OH 0.0100 125,000 1,250
39,300

D. 3 PEKERJAAN ACIAN PLESTERAN


D. 3.1 Tiap 1 M2 Acian Plesteran 31,525
Bahan
1 Tonasa Semen Portland 50 Kg Kg 3.2500 1,100 3,575

Tenaga Kerja
1 Pekerja OH 0.1500 95,000 14,250
2 Tukang OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0080 125,000 1,000
27,950
E. ANALISA HARGA SATUAN PEK. KUDA-KUDA DAN ATAP
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

E. 1 PEKERJAAN KAP DAN RANGKA ATAP


E. 1.1 Tiap 1 M3 Pekerjaan Kuda-kuda Kayu Kelas II 4,852,456
Bahan
1 Balok Kayu Kelas II M3 1.1000 2,400,000 2,640,000
2 Besi Strip Kg 15.0000 10,684 160,256
3 Paku Biasa Kg 5.6000 22,000 123,200
2,923,456

Tenaga Kerja
1 Pekerja OH 4.0000 95,000 380,000
2 Tukang Kayu OH 12.0000 115,000 1,380,000
3 Kepala Tukang Kayu OH 1.2000 120,000 144,000
4 Mandor OH 0.2000 125,000 25,000
1,929,000

E. 1.2 Tiap 1 M3 Pekerjaan Gordeng Kayu Kelas II 4,023,656


Bahan
1 Balok Kayu Kelas II M3 1.1000 2,400,000 2,640,000
2 Besi Strip Kg 15.0000 10,684 160,256
3 Paku Biasa Kg 3.0000 22,000 66,000
2,866,256

Tenaga Kerja
1 Pekerja OH 2.4000 95,000 228,000
2 Tukang Kayu OH 7.2000 115,000 828,000
3 Kepala Tukang Kayu OH 0.7200 120,000 86,400
4 Mandor OH 0.1200 125,000 15,000
1,157,400

E. 1.3 Tiap 1 M2 Pekerjaan Rangka Usuk / Reng Kayu Kelas II 68,325


Bahan
1 Kayu Meranti Kaso 4/6 Kls II M3 0.0140 2,000,000 28,000
2 Kayu Meranti Reng 3/4 Kls II M3 0.0060 2,000,000 12,000
3 Paku Biasa Kg 0.2500 22,000 5,500
45,500

Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0050 125,000 625
22,825

E. 1.4 Tiap 1 M' Pekerjaan Lisplank Ukuran 3 x 30 cm, Kayu Kelas II 63,025
Bahan
1 Kayu Meranti Papan Kls II M3 0.0110 2,400,000 26,400
2 Paku Biasa Kg 0.0500 22,000 1,100
27,500

Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0050 125,000 625
35,525

E. 1.5 Tiap 1 M' Pekerjaan Talang Datar Seng BJLS 30 146,893


Bahan
1 Seng Plat M' 1.0000 48,000 48,000
2 Paku Biasa Kg 0.0150 22,000 330
3 Kayu Meranti Papan M3 0.0190 2,400,000 45,600
93,930

Tenaga Kerja
1 Pekerja OH 0.0400 95,000 3,800
2 Tukang Kayu OH 0.4000 115,000 46,000
3 Kepala Tukang Kayu OH 0.0250 120,000 3,000
4 Mandor OH 0.0013 125,000 163
52,963

E. 2 PEKERJAAN PENUTUP ATAP


E. 2.1 Tiap 1 M2 Pasangan Genteng Kanmuri 119,835
Bahan
1 Atap Genteng Kanmuri Milenio Bh 10.0000 9,500 95,000

Tenaga Kerja
1 Pekerja OH 0.1500 95,000 14,250
2 Tukang Kayu OH 0.0750 115,000 8,625
3 Kepala Tukang Kayu OH 0.0080 120,000 960
4 Mandor OH 0.0080 125,000 1,000
24,835

E. 2.2 Tiap 1 M' Pasangan Bubungan Genteng Kanmuri 332,860


Bahan
1 Bubungan Genteng Kanmuri Bh 5.0000 50,000 250,000
2 Indocement Portland 50 kg Kg 8.0000 1,360 10,880
3 Pasir Pasang M3 0.0320 190,000 6,080
266,960

Tenaga Kerja
1 Pekerja OH 0.4000 95,000 38,000
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang OH 0.0200 120,000 2,400
4 Mandor OH 0.0200 125,000 2,500
65,900
F. ANALISA HARGA SATUAN PEKERJAAN PLAFOND
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

F. 1 PEKERJAAN BALOK PLAFOND


F. 1.1 Tiap 1 M2 Pemasangan Rangka langit-Langit (60x60) cm, Kayu Kelas II 103,345
Bahan
1 Balok Kayu Kelas II M3 0.0163 2,400,000 39,120
2 Paku Biasa Kg 0.2500 22,000 5,500
44,620

Tenaga Kerja
1 Pekerja OH 0.2000 95,000 19,000
2 Tukang Kayu OH 0.3000 115,000 34,500
3 Kepala Tukang Kayu OH 0.0300 120,000 3,600
4 Mandor OH 0.0130 125,000 1,625
58,725

F. 2 PASANG PLAFOND
F. 2.1 Tiap 1 M2 Pemasangan Plafond Plywood 6 mm, uk. (1,22x2,44) m 46,385
Bahan
1 Triplek 6 mm Lbr 0.3750 69,000 25,875
2 Paku Biasa Kg 0.0300 22,000 660
26,535

Tenaga Kerja
1 Pekerja OH 0.0700 95,000 6,650
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0040 125,000 500
19,850

F. 3 PASANG LIST PROFIL KAYU


F. 3.1 Tiap 1 M' Pemasangan List Profl Kayu 37,945
Bahan
1 List Profil Kayu M' 1.0500 25,000 26,250
2 Paku Biasa Kg 0.0100 22,000 220
26,470

Tenaga Kerja
1 Pekerja OH 0.0500 95,000 4,750
2 Tukang Kayu OH 0.0500 115,000 5,750
3 Kepala Tukang Kayu OH 0.0050 120,000 600
4 Mandor OH 0.0030 125,000 375
11,475

G. ANALISA HARGA SATUAN PEKERJAAN SANITASI


Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

G. 1 PEMASANGAN 1 BUAH KLOSET DUDUK


G. 1.1 Pemasangan 1 Buah Kloset Duduk 1,575,054
Bahan
1 American Standart Kloset Duduk Bh 1.0000 1,265,000 1,265,000
2 Perlengkapan (6%) Harga Kloset Kg 0.0600 75,900 4,554
1,269,554

Tenaga Kerja
1 Pekerja OH 1.0000 95,000 95,000
2 Tukang Batu OH 1.5000 115,000 172,500
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1600 125,000 20,000
305,500

G. 2 PEMASANGAN 1 BUAH FLOOR DRAIN


G. 2.1 Pemasangan 1 Buah Floor Drain 49,275
Bahan
1 Floor Drain Bh 1.0000 35,000 35,000

Tenaga Kerja
1 Pekerja OH 0.0100 95,000 950
2 Tukang Batu OH 0.1000 115,000 11,500
3 Kepala Tukang OH 0.0100 120,000 1,200
4 Mandor OH 0.0050 125,000 625
14,275

G. 3 PEMASANGAN 1 BUAH BAK CUCI PIRING


G. 3.1 Pemasangan 1 Buah Bak Cuci Piring 288,975
Bahan
1 Bak Cuci Piring Stainless Bh 1.0000 235,000 235,000

Tenaga Kerja
1 Pekerja OH 0.5000 95,000 47,500
2 Tukang Batu OH 0.0500 115,000 5,750
3 Kepala Tukang Batu OH 0.0050 120,000 600
4 Mandor OH 0.0010 125,000 125
53,975

G. 4 PEMASANGAN 1 BUAH WASTAFEL


G. 4.1 Pemasangan 1 Buah Wastafel 1,061,250
Bahan
1 Wastafel Bh 1.0000 750,000 750,000
2 Perlengkapan - 0.1200 750,000 90,000
840,000

Tenaga Kerja
1 Pekerja OH 1.2000 95,000 114,000
2 Tukang Batu OH 1.4500 115,000 166,750
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1000 125,000 12,500
311,250

G. 5 PEMASANGAN PIPA AIR PVC


G. 5.1 Pemasangan 1 M' Pipa PVC Tipe AW Diameter 1/2" 20,565
Bahan
1 AW Pipa PVC Ø 1/2" M' 1.2000 6,000 7,200
2 Perlengkapan - 0.3500 6,000 2,100
9,300

Tenaga Kerja
1 Pekerja OH 0.0360 95,000 3,420
2 Tukang Batu OH 0.0600 115,000 6,900
3 Kepala Tukang Batu OH 0.0060 120,000 720
4 Mandor OH 0.0018 125,000 225
11,265

G. 5.2 Pemasangan 1 M' Pipa PVC Tipe AW Diameter 3/4" 28,523


Bahan
1 AW Pipa PVC Ø 3/4" M' 1.2000 7,500 9,000
2 Perlengkapan - 0.3500 7,500 2,625
11,625

Tenaga Kerja
1 Pekerja OH 0.0540 95,000 5,130
2 Tukang Batu OH 0.0900 115,000 10,350
3 Kepala Tukang Batu OH 0.0090 120,000 1,080
4 Mandor OH 0.0027 125,000 338
16,898

G. 5.3 Pemasangan 1 M' Pipa PVC Tipe AW Diameter 3" 133,358


Bahan
1 AW Pipa PVC Ø 3" M' 1.2000 25,000 30,000
2 Perlengkapan - 0.3500 25,000 8,750
38,750

Tenaga Kerja
1 Pekerja OH 0.8100 95,000 76,950
2 Tukang Batu OH 0.1350 115,000 15,525
3 Kepala Tukang Batu OH 0.0135 120,000 1,620
4 Mandor OH 0.0041 125,000 513
94,608

G. 6 PEMASANGAN KRAN AIR


G. 6.1 Pemasangan 1 Buah Kran Air 48,788
Bahan
1 Kran Air Bh 1.0000 35,000 35,000
2 Seal Tape Bh 0.0250 3,000 75
35,075

Tenaga Kerja
1 Pekerja OH 0.0100 95,000 950
2 Tukang Batu OH 0.1000 115,000 11,500
3 Kepala Tukang Batu OH 0.0100 120,000 1,200
4 Mandor OH 0.0005 125,000 63
13,713

G. 6.2 Pemasangan 1 Buah Shower Set 1,618,670


Bahan
1 TOTO Umi Single Lever Shower S Bh 1.0000 1,600,000 1,600,000
2 Seal Tape Bh 0.0250 3,000 75
1,600,075

Tenaga Kerja
1 Pekerja OH 0.0100 5,000 50
2 Tukang Batu OH 0.1000 185,000 18,500
3 Kepala Tukang Batu OH 0.0100 4,500 45
4 Mandor OH 0.0005 400 0
18,595
H. ANALISA HARGA SATUAN PEKERJAAN INSTALASI LISTRIK
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

H. 1 PEMASANGAN INSTALASI LISTRIK


H. 1.1 Pemasangan Instalasi Listrik 5,630,750
Bahan
1 Philips Lampu TL Lengkap Bh 2.0000 100,000 200,000
2 Lampu LED Philips 20 W Bh 5.0000 38,000 190,000
3 Fitting Lampu Bh 5.0000 7,000 35,000
4 Saklar Tunggal Bh 7.0000 10,000 70,000
5 Stop Kontak Bh 12.0000 24,000 288,000
6 MCB 6 A Bh 2.0000 44,000 88,000
7 Kotak ( Box) MCBN Bh 1.0000 75,000 75,000
8 T-Dos (Kontak Hubung Bagi) Bh 7.0000 5,500 38,500
9 Kabel 3 x 2,5 M' 50.0000 16,000 800,000
10 Pipa PVC (Pipa Listrik) M' 50.0000 1,625 81,250
11 KWH (Pasang Baru) Ls 1.0000 2,165,000 2,165,000
12 Alat Kecil Ls 1.0000 100,000 100,000
4,130,750

Tenaga Kerja
1 Biaya Pemasangan Ls 1.0000 1,500,000 1,500,000
I. ANALISA HARGA SATUAN PEKERJAAN LANTAI & DINDING KERAMIK
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

I. 1 PEMASANGAN LANTAI KERAMIK


I. 1.1 Tiap 1 M2 Pemasangan Lantai Keramik Polos 30 x 30 184,479
Bahan
1 Keramik Polos 30x30 Asia Tile M2 1.0500 40,000 42,000
2 Tonasa Semen Portland 50 Kg Kg 8.1900 1,100 9,009
3 Pasir Pasang M3 0.0450 190,000 8,550
4 Semen Warna Kg 1.6200 11,000 17,820
77,379

Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.3500 115,000 40,250
3 Kepala Tukang Batu OH 0.0350 120,000 4,200
4 Mandor OH 0.0300 125,000 3,750
107,100

I. 1.2 Tiap 1 M2 Pemasangan Lantai Keramik Kamar Mandi 30 x 30 203,379


Bahan
1 Keramik Lt Kmr Mandi Kasar 30x3 M2 1.0500 58,000 60,900
2 Tonasa Semen Portland 50 Kg Kg 8.1900 1,100 9,009
3 Pasir Pasang M3 0.0450 190,000 8,550
4 Semen Warna Kg 1.6200 11,000 17,820
96,279

Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.3500 115,000 40,250
3 Kepala Tukang Batu OH 0.0350 120,000 4,200
4 Mandor OH 0.0300 125,000 3,750
107,100

I. 2 PEMASANGAN KERAMIK DINDING KAMAR MANDI


I. 2.1 Tiap 1 M2 Pemasangan Keramik Dinding Kamar Mandi 202,775
Bahan
1 Kia Keramik Polos 20x20 M2 1.0500 45,700 47,985
2 Tonasa Semen Portland 50 Kg Kg 9.3000 1,100 10,230
3 Pasir Pasang M3 0.0180 190,000 3,420
4 Semen Warna Kg 1.9400 11,000 21,340
82,975

Tenaga Kerja
1 Pekerja OH 0.6200 95,000 58,900
2 Tukang Batu OH 0.4500 115,000 51,750
3 Kepala Tukang Batu OH 0.0450 120,000 5,400
4 Mandor OH 0.0300 125,000 3,750
119,800
J. ANALISA HARGA SATUAN PEKERJAAN KUSEN, PINTU DAN JENDELA
Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

J. 1 PEKERJAAN KUSEN
J. 1.1 Tiap 1 M3 Pasang Kusen Pintu Dan Jendela Kayu 5,850,000
Bahan
1 Balok Kayu Kelas II M3 1.1000 2,400,000 2,640,000
2 Paku Biasa 3-5 cm Kg 1.2500 22,000 27,500
3 Lem Kayu Kg 1.0000 35,000 35,000
2,702,500
Tenaga Kerja
1 Pekerja OH 6.0000 95,000 570,000
2 Tukang OH 20.0000 115,000 2,300,000
3 Kepala Tukang OH 2.0000 120,000 240,000
4 Mandor OH 0.3000 125,000 37,500
3,147,500

J. 2 PEMASANGAN PINTU
J. 2.1 Tiap 1 M2 Pemasangan Daun Pintu Kayu Kelas II 1,418,750
Bahan
1 Pintu Meranti 80-100 x 200 Bh 1.0000 1,000,000 1,000,000

Tenaga Kerja
1 Pekerja OH 1.0000 95,000 95,000
2 Tukang Kayu OH 2.5000 115,000 287,500
3 Kepala Tukang Kayu OH 0.2500 120,000 30,000
4 Mandor OH 0.0500 125,000 6,250
418,750

J. 2.2 Tiap 1 Buah Pemasangan Pintu UPVC untuk Kamar Mandi 1,385,310
Bahan
1 Pintu UPVC satu set Bh 1.0000 950,000 950,000
2 Perlengkapan - 0.1200 950,000 114,000
3 Indocement Portland 50 kg Kg 6.0000 1,360 8,160
4 Pasir Pasang M3 0.0100 190,000 1,900
1,074,060

Tenaga Kerja
1 Pekerja OH 1.2000 95,000 114,000
2 Tukang Batu OH 1.4500 115,000 166,750
3 Kepala Tukang Batu OH 0.1500 120,000 18,000
4 Mandor OH 0.1000 125,000 12,500
311,250

J. 3 PEMASANGAN JENDELA
J. 3.1 Tiap 1 M2 Pasang Daun Jendela Kaca Kelas II 403,100
Bahan
1 Kayu Meranti Papan Kelas II M3 0.0240 2,400,000 57,600
2 Lem Kayu Kg 0.3000 35,000 10,500
68,100

Tenaga Kerja
1 Pekerja OH 0.8000 95,000 76,000
2 Tukang Kayu OH 2.0000 115,000 230,000
3 Kepala Tukang Kayu OH 0.2000 120,000 24,000
4 Mandor OH 0.0400 125,000 5,000
335,000

J. 3.2 Tiap 1 M' Memasang Jalusi Kayu Kelas II 451,925


Bahan
1 Kayu Meranti Papan Kelas II M3 0.0600 2,400,000 144,000
2 Paku Biasa Kg 0.1500 22,000 3,300
147,300
Tenaga Kerja
1 Pekerja OH 0.5000 95,000 47,500
2 Tukang Kayu OH 2.0000 115,000 230,000
3 Kepala Tukang Kayu OH 0.2000 120,000 24,000
4 Mandor OH 0.0250 125,000 3,125
304,625

J. 4 PEKERJAAN KUNCI DAN KACA


J. 4.1 Pemasangan Kunci Tanam 322,275
Bahan
1 Belucci Kunci Pintu Bh 1.0000 240,000 240,000

Tenaga Kerja
1 Pekerja OH 0.0600 95,000 5,700
2 Tukang Kayu OH 0.6000 115,000 69,000
3 Kepala Tukang Kayu OH 0.0600 120,000 7,200
4 Mandor OH 0.0030 125,000 375
82,275

J. 4.2 Pemasangan Engsel Pintu 70,575


Bahan
1 Falco Engsel Pintu 5 " Bh 1.0000 50,000 50,000

Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575

J. 4.3 Pemasangan Engsel Jendela 43,263


Bahan
1 Falco Engsel Jendela 3" Bh 1.0000 21,000 21,000

Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Tukang Kayu OH 0.1000 115,000 11,500
3 Kepala Tukang Kayu OH 0.0100 120,000 1,200
4 Mandor OH 0.0005 125,000 63
22,263

J. 4.4 Pemasangan Hak/Kait Angin 59,075


Bahan
1 Hak Angin 10 inch Bh 1.0000 38,500 38,500

Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575

J. 4.5 Pemasangan Grendel Jendela 40,550


Bahan
1 Grendel Jendela Bh 1.0000 12,000 12,000

Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0100 125,000 1,250
28,550

J. 4.6 Pemasangan Grendel Pintu 82,550


Bahan
1 Grendel Pintu Bh 1.0000 54,000 54,000

Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Kayu OH 0.2000 115,000 23,000
3 Kepala Tukang Kayu OH 0.0200 120,000 2,400
4 Mandor OH 0.0100 125,000 1,250
28,550

J. 4.7 Tiap 1 M2 Pemasangan Kaca Tebal 5 mm 122,325


Bahan
1 Kaca Polos 5 mm (Bening) M2 1.1000 92,500 101,750

Tenaga Kerja
1 Pekerja OH 0.0150 95,000 1,425
2 Tukang Kayu OH 0.1500 115,000 17,250
3 Kepala Tukang Kayu OH 0.0150 120,000 1,800
4 Mandor OH 0.0008 125,000 100
20,575

K. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN


Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

. 1 PENGECATAN TEMBOK BARU


K. 1.1 Tiap 1 M2 Pengecatan Tembok Baru 19,969
Bahan
1 Paragon Plamir Kg 0.1000 9,000 900
Cat Dasar Dulux Catylac Kg 0.1000 28,750 2,875
Cat Tembok Dulux Catylac Kg 0.2600 23,000 5,980
9,755

Tenaga Kerja
1 Pekerja OH 0.0200 95,000 1,900
2 Tukang Cat OH 0.0630 115,000 7,245
3 Kepala Tukang Cat OH 0.0063 120,000 756
4 Mandor OH 0.0025 125,000 313
10,214

K. 2 PENGECATAN BIDANG KAYU


K. 2.1 Tiap 1 M2 Pelaburan Bidang kayu dengan Cat Residu dan Teer 22,850
Bahan
1 Teer Anti Rayap Oles Ltr 0.3500 36,000 12,600

Tenaga Kerja
1 Pekerja OH 0.1000 95,000 9,500
2 Mandor OH 0.0060 125,000 750
10,250

K. 2.2 1 M2 Cat Bidang Kayu Baru (1 lps Plamir), 1 lps cat dasar, 3 lps cat penutup 55,318
Bahan
1 Cat Meni Kayu Kg 0.2000 61,000 12,200
2 Plamir Kayu Damex Kg 0.1500 15,000 2,250
3 Cat Kayu Avian Kg 0.3500 61,000 21,350
35,800

Tenaga Kerja
1 Pekerja OH 0.0700 95,000 6,650
2 Tukang Cat OH 0.1050 115,000 12,075
3 Kepala Tukang Cat OH 0.0040 120,000 480
4 Mandor OH 0.0025 125,000 313
19,518

L. ANALISA HARGA SATUAN PEKERJAAN LUAR


Harga Bahan (Rp) Harga Satuan
NO Uraian Satuan Koef
Upah Tenaga (Rp) ( Rp )

L. 1 PEKERJAAN LUAR
L. 1.1 Pekerjaan Septictank (Lumpsum) 3,500,000
Bahan
1 Septictank Biotech Bh 1.0000 2,000,000 2,000,000

Tenaga Kerja
1 Tukang Ls 1.0000 1,500,000 1,500,000

L. 1.2 Pekerjaan Toren + Dudukan 3,500,000


Bahan
1 Toren/Tangki Air 1200 L Bh 1.0000 1,350,000 1,350,000

Tenaga Kerja
1 Tukang Ls 1.0000 2,150,000 2,150,000
RENCANA ANGGARAN BIAYA
Pekerjaan : Rumah Tinggal Type 36/60
Lokasi : Jl. Raya Menuju Surga, Gg. Ikhlas Bersedekah, No. 1
Tahun : 2020
No Uraian Pekerjaan Analisa Harga Satuan (AHS)
Volume Sat Harga Satuan (Rp.) Jumlah (Rp.)
A PEKERJAAN PERSIAPAN
A.1 Pekerjaan persiapan
A.1.1 Pembersihan Lokasi 60.0000 M2 15,750.00 945,000.00
1
A.1.2 Pengukuran dan Pemasangan Bouwplank 32.0000 M 90,179.00 2,885,728.00
A.1.3 Air Kerja 1.0000 Ls 5,000,000.00 5,000,000.00
TOTAL 8,830,728.00

B PEKERJAAN PONDASI
B.1 Pekerjaan Galian Tanah
B.1.1 Galian Tanah 35.2000 M3 74,375.00 2,618,000.00
3
B.1.2 Urugan Tanah Kembali 26.8800 M 24,791.67 666,400.00
3
B.1.3 Pasir Urug 3.5600 M 233,750.00 832,150.00
3
B.1.4 Pemadatan Tanah 26.8800 M 52,197.92 1,403,080.00
TOTAL 5,519,630.00
B.2 Pekerjaan Pondasi Batu Kali
B.2.1 Pasangan Pondasi Aanstamping 5.2800 M3 350,505.00 1,850,666.40
B.2.2 Pasangan Pondasi Batu Kali 11.8800 M3 703,035.00 8,352,055.80
TOTAL 10,202,722.20

C PEKERJAAN BETON
C.3.1 Sloof 15 x 20 1.3200 M3 4,201,683.66 5,546,222.43
3
C.3.2 Kolom 15 x 20 1.2600 M 4,814,037.47 6,065,687.21
C.3.3 Balok 15 x 20 1.0800 M3 7,053,955.66 7,618,272.11
C.3.4 Meja Beton Bertulang 0.0960 M3 4,292,165.80 412,047.92
TOTAL 19,642,229.67

D PEKERJAAN DINDING
D.1 Pekerjaan Pasangan Dinding
D.1.1 Pasangan Dinding 1/2 Bata (1:5) 113.9000 M2 90,273.00 10,282,094.70
2
D.1.2 Pasangan Dinding 1 Bata (1:5) 0.0000 M 190,700.00 -
TOTAL 10,282,094.70
D.2 Pekerjaan Plesteran
D.2.1 Plasteran Dinding (1:3) 152.9000 M2 52,223.60 7,984,988.44
2
D.2.2 .Plasteran Dinding (1:4) 0.0000 M 48,820.00 -
TOTAL 7,984,988.44
D.3 Pekerjaan Acian
D.3.1 Acian 152.9000 M2 31,525.00 4,820,172.50
TOTAL 4,820,172.50

E PEKERJAAN KUDA-KUDA DAN ATAP


E.1 Pekerjaan Kap dan Rangka Atap 21,565,857.02
3
E.1.1 Pekerjaan Kuda-Kuda Kayu 0.3953 M 4,852,456.41 1,918,078.97
3
E.1.2 Pekerjaan Gordeng 0.2880 M 4,023,656.41 1,158,813.05
2
E.1.3 Pekerjaan Rangka Usuk / Reng 56.0000 M 68,325.00 3,826,200.00
1
E.1.4 Pekerjaan Listplank 14.0000 M 63,025.00 882,350.00
1
E.1.5 Pekerjaan Talang 30.0000 M 146,892.50 4,406,775.00
TOTAL 12,192,217.02
E.2 Pekerjaan Penutup Atap
E.2.1 Pemasangan Genteng 56.0000 M2 119,835.00 6,710,760.00
1
E.2.2 Pemasangan Bubungan 8.0000 M 332,860.00 2,662,880.00
TOTAL 9,373,640.00

F PEKERJAAN PLAFOND
F.1 Pekerjaan Rangka Plafond
F.1.1 Pekerjaan Rangka Plafond 36.0000 M2 103,345 3,720,420.00
TOTAL 3,720,420.00
F.2 Pemasangan Plafond
F.2.1 Pemasangan Plafond 36.0000 M2 46,385 1,669,860.00
TOTAL 1,669,860.00
F.3 Pemasangan List Plafond
F.3.1 Pemasangan List Plafond 36.0000 M1 37,945 1,366,020.00
TOTAL 1,366,020.00

G PEKERJAAN SANITASI
G.1 Pemasangan Kloset Duduk
G.1.1 Pemasangan Kloset Duduk 1 Bh 1,575,054 1,575,054.00
TOTAL 1,575,054.00
G.2 Pemasangan Floor Drain
G.2.1 Pemasangan Floor Drain 1 Bh 49,275 49,275.00
TOTAL 49,275.00
G.3 Pemasangan Bak Cuci Piring
G.3.1 Pemasangan Bak Cuci Piring 1 Bh 288,975 288,975.00
TOTAL 288,975.00
G.4 Pemasangan Wastafel
G.4.1 Pemasangan Wastafel 1.0000 Bh 1,061,250.00 1,061,250.00
TOTAL 1,061,250.00
G.5 Pemasangan Pipa Air PVC
G.5.1 Memasang Pipa PVC Diameter 1/2'' 20.0000 M1 20,565.00 411,300.00
1
G.5.2 Memasang Pipa PVC Diameter 3/4'' 18.0000 M 28,522.50 513,405.00
G.5.3 Memasang Pipa PVC Diameter 3'' 19.0000 M1 133,357.50 2,533,792.50
TOTAL 3,458,497.50
G.6 Pemasangan Kran Air
G.6.1 Memasang 1 Buah Kran Air 5.0000 Bh 48,787.50 243,937.50
G.6.2 Memasang 1 Buah Shower Set 1.0000 Bh 1,618,670.20 1,618,670.20
TOTAL 1,862,607.70

H PEKERJAAN INSTALASI LISTRIK


H.1 Pekerjaan Instalasi Listrik
H.1.1 Pekerjaan Instalasi Listrik 1.0000 Ls 5,630,750.00 5,630,750.00
TOTAL 5,630,750.00

I PEMASANGAN LANTAI DAN DINDING KERAMIK


I.1 Pemasangan Lantai Keramik
I.1.1 Pemasangan Lantai Keramik 33.0000 M2 184,479.00 6,087,807.00
2
I.1.2 Pemasangan Lantai Keramik Kamar Mandi 3.0000 M 203,379.00 610,137.00
TOTAL 6,697,944.00
I.2 Pemasangan Keramik Dinding Kamar Mandi
I.2.1 Pemasangan Keramik Dinding Kamar Mandi 6.1500 M2 202,775.00 1,247,066.25
TOTAL 1,247,066.25

J PEKERJAAN KUSEN, PINTU DAN JENDELA


J.1 Pekerjaan Kusen
J.1.1 Pekerjaan Kusen 0.3931 M3 5,850,000.00 2,299,752.00
TOTAL 2,299,752.00
J.2. Pemasangan Pintu
J.2.1 Pemasangan Daun Pintu Kayu 3.0000 M2 1,418,750.00 4,256,250.00
J.2.2 Pemasangan Daun Pintu UPVC (Kamar Mandi) 1.0000 Bh 1,385,310.00 1,385,310.00
TOTAL 5,641,560.00
J.3. Pemasangan Jendela
J.3.1 Pemasangan Daun Jendela Kaca 6.0000 M2 403,100.00 2,418,600.00
1
J.3.2 Pemasangan Jalusi Kayu 0.0000 M 451,925.00 -
TOTAL 2,418,600.00
J.4. Pekerjaan Kunci Dan Kaca
J.4.1 Pemasangan Kunci Tanam 3.0000 Bh 322,275.00 966,825.00
J.4.2 Pemasangan Engsel Pintu 9.0000 Bh 70,575.00 635,175.00
J.4.3 Pemasangan Engsel Jendela 24.0000 Bh 43,262.50 1,038,300.00
J.4.4 Pemasangan Hak / Kait Angin 8.0000 Bh 59,075.00 472,600.00
J.4.5 Pemasangan Grendel Jendela 8.0000 Bh 40,550.00 324,400.00
J.4.6 Pemasangan Grendel Pintu 3.0000 Bh 82,550.00 247,650.00
J.4.7 Pemasangan Kaca Jendela 5.6112 M2 122,325.00 686,390.04
TOTAL 4,371,340.04

K PEKERJAAN PENGECATAN
K.1. Pengecatan Tembok Baru
K.1.1 Pengecatan Tembok Baru 152.9000 M2 19,968.50 3,053,183.65
TOTAL 3,053,183.65
K.2. Pengecatan Bidang Kayu
K.2.1 Pelaburan Bidang Kayu Dengan Residu dan Teer 55.6560 M2 22,850.00 1,271,739.60
2
K.2.2 Pengecatan Bidang Kayu Baru 122.9548 M 55,317.50 6,801,549.38
TOTAL 8,073,288.98

L PEKERJAAN PERLENGKAPAN LUAR


L.1. Pekerjaan Perlengkapan Luar
L.1.1 Pekerjaan Septictank 1.0000 Ls 3,500,000.00 3,500,000.00
L.1.2 Pekerjaan Toren Dan Dudukan 1.0000 Ls 3,500,000.00 3,500,000.00
TOTAL 7,000,000.00
REKAPITULASI
Pekerjaan : Rumah Tinggal Type 36/60
Lokasi : Jl. Raya Menuju Surga, Gg. Ikhlas Bersedekah, No. 1
Tahun : 2020

JENIS PEKERJAAN HARGA PEKERJAAN


(Rp)

1 2 3
A PEKERJAAN PERSIAPAN 8,830,728.00

B PEKERJAAN PONDASI 15,722,352.20

C PEKERJAAN BETON 19,642,229.67

D PEKERJAAN DINDING 23,087,255.64

E PEKERJAAN KUDA-KUDA DAN ATAP 21,565,857.02

F PEKERJAAN PLAFOND 6,756,300.00

G PEKERJAAN SANITASI 8,295,659.20

H PEKERJAAN INSTALASI LISTRIK 5,630,750.00

I PEKERJAAN LANTAI & DINDING KERAMIK 7,945,010.25

J PEKERJAAN KUSEN, PINTU DAN JENDELA 14,731,252.04

K PEKERJAAN PENGECATAN 11,126,472.63

L PEKERJAAN PERLENGKAPAN LUAR 7,000,000.00

SUB TOTAL BIAYA KONSTRUKSI : Rp. 150,333,866.65


PPn BIAYA KONSTRUKSI 10% : Rp. 15,033,386.67
KONTRAKTOR 10% : Rp. 15,033,386.67
TOTAL BIAYA KONSTRUKSI : Rp. 180,400,639.98
PEMBULATAN : Rp. 180,401,000.00

TERBILANG :

SERATUS DELAPAN PULUH JUTA EMPAT RATUS SATU RIBU RUPIAH


TIME SCHEDULE

Proyek : Tugas Manajemen Konstruksi


Pekerjaan : Pembangunan Rumah Tinggal Type 36/60
Lokasi : Jl. Raya Menuju Surga, Gg. Ikhlas Bersedekah, No. 1
WAKTU PELAKSANAAN
NO JENIS PEKERJAAN JUMLAH BOBOT MINGGU KE
(%) 1 2 3 4 5 6 7 8 9 10
A PEK. PERSIAPAN + ( MOB-DEMOB) 8,830,728 5.87 0.587 0.587 0.587 0.587 0.587 0.587 0.587 0.587 0.587 0.587
B PEK. PONDASI 15,722,352.20 10.46 4.690 5.770
C PEK. BETON 19,642,229.67 13.07 1.400 4.444 3.104 4.124
D PEK. DINDING 23,087,255.64 15.36 6.090 5.150 4.115
E PEK. KUDA-KUDA DAN ATAP 21,565,857.02 14.35 4.299 3.650 3.199 3.199
F PEK. PLAFOND 6,756,300.00 4.49 1.560 1.465 1.465
G PEK. SANITASI 8,295,659.20 5.52 1.970 1.830 1.720
H PEK. INSTALASI LISTRIK 5,630,750.00 3.75 3.750
I PEK. LANTAI & DINDING KERAMIK 7,945,010.25 5.28 5.280
J PEK. KUSEN, PINTU & JENDELA 14,731,252.04 9.80 2.120 2.450 5.230
K PEK. PENGECATAN 11,126,472.63 7.40 2.400 2.300 2.700
L PEK. PERLENGKAPAN LUAR 7,000,000.00 4.66 2.460 1.200 1.000
TOTAL 150,333,866.65 100
Rencana fisik per minggu 0.59 5.28 7.76 11.12 15.26 18.46 14.77 13.12 9.37 4.29
Rencana fisik komulatif 0.59 5.86 13.62 24.74 40.00 58.46 73.23 86.35 95.72 100.00

Anda mungkin juga menyukai