1 2 3 4
I MATERIAL.
1 Air (Biaya air tawar) ltr Rp 130.00
2 Aluminium 4" m2 Rp 65,000.00
3 Batu pecah mesin 1/2 m3 Rp 185,000.00
4 Batu pecah mesin 2/3 m3 Rp 160,000.00
5 Batu Kerikil M3 Rp 110,000.00
6 Batubata Bh Rp 650.00
7 Besi Profil C 100 - 150 mm Kg Rp 12,500.00
8 Besi Profil WF <= 200mm Kg Rp 12,500.00
9 Besi Profil WF <= 200mm s/d 400 mm Kg Rp 13,500.00
10 Besi Plat baja Kg Rp 13,500.00
11 Besi Plat Bordes 4"x8" Tebal 2 mm Kg Rp 13,500.00
12 Besi Plat landas tb 12mm Kg Rp 64,750.00
13 Besi plat strip 3mm x 19 mm x 6 m Kg Rp 14,750.00
14 Besi beton polos Kg Rp 9,750.00
15 Besi Ulir Kg Rp 9,750.00
16 metal furing 2/4 cm m1 Rp 13,500.00
17 Cat Tembok ex vinilex Kg Rp 35,000.00
18 Clear doof kg Rp 43,450.00
19 aquaproofing Kg Rp 50,000.00
20 Closed Jongkok Porselain bh Rp 225,000.00
21 Closed Duduk Porselain bh Rp 850,000.00
22 Coumpond kg Rp 31,400.00
23 Engsel Kuningan ARCH u Pintu Stel Rp 27,100.00
24 Engsel Kuningan ARCH u Jendela Stel Rp 27,100.00
25 Elektroda baja Kg Rp 20,000.00
26 Fitting Plafond Bh Rp 12,000.00
27 Fiber Glass m2 Rp 25,900.00
28 Gedeg Guling m2 Rp 29,500.00
29 Genteng karang Pilang good year Bh Rp 4,500.00
30 Grendel Ekspanyolet bh Rp 53,950.00
31 Kalsiboard t = 4 mm m2 Rp 50,000.00
32 Gypsum t = 9 mm m2 Rp 65,000.00
33 Hak angin sikutan (kuningan) Stel Rp 24,850.00
34 Isolator Bh Rp 5,000.00
35 Wuwung Genteng karang Pilang / Wisma Bh Rp 4,500.00
36 Karet Kusen Alumunium m1 Rp 22,250.00
37 Kawat Bendrat Kg Rp 15,350.00
38 Kayu Gelam Ø 8-12cm p=3m btg Rp 11,500.00
39 Kayu Kamper 1/3 cm m1 Rp 9,000.00
40 Kayu kamper (slimar) m3 Rp 6,750,000.00
41 Kayu Meranti Balok 8/12 m3 Rp 5,500,000.00
42 Kayu Meranti Usuk 4/6 dan 5/7 m3 Rp 5,500,000.00
43 Kayu Meranti ( Bekisting ) m3 Rp 3,100,000.00
44 Kayu meranti papan 4/30/400 m3 Rp 5,500,000.00
45 Kayu Meranti papan 2/20 m3 Rp 5,500,000.00
46 Keramik 30 x 30 putih polos ex. Roman m2 Rp 37,100.00
47 Keramik 30 x 30 wafel ex. Roman m2 Rp 37,100.00
48 Keramik 30 x 30 cm (motif/warna ) ex. Roman m2 Rp 37,100.00
49 Keramik 30 x 30 cm (motif/warna gelap) ex. Roman n2 Rp 37,100.00
50 Keramik dinding 20x25 ex. Roman n2 Rp 37,100.00
51 Keramik 40 x 40 cm (motif/warna gelap) ex. Roman n2 Rp 43,100.00
52 Keramik Tegel Porselain 11x11 ex. Roman m2 Rp 40,000.00
53 Keramik Tegel Porselain 20x20 ex. Roman m2 Rp 44,000.00
54 Keramik plint 7,5x20 cm m1 Rp 5,400.00
55 Kertas gosok No. 150 Lbr Rp 3,500.00
56 Kertas gosok No. 280 Lbr Rp 3,500.00
57 Kran air 1/2" sun'i Bh Rp 52,150.00
58 Kran air Lokal Bh Rp 9,750.00
59 Krepyak Nako bh Rp 8,650.00
60 Kunci tanam besar 2 x putar kuningan Bh Rp 81,250.00
61 Kunci Tanam Wing 808 Bh Rp 48,600.00
62 Kaca Polos t = 5 mm m2 Rp 70,000.00
63 Kaca Polos t = 3 mm m2 Rp 53,950.00
64 Kaca Reyben t = 5 mm m2 Rp 86,350.00
65 Kabel NYA 500 volt 2 x 2,5 Mm2 m Rp 11,500.00
66 Sewa Las Doof bh Rp 1,000.00
67 Lampu SL 23 Watt bh Rp 55,000.00
68 Lem kayu kg Rp 26,500.00
69 Lem PVC bh Rp 12,100.00
70 Listplafond Gypsum m Rp 12,500.00
71 MCB bh Rp 650,000.00
72 Paku skrup Bh Rp 3,000.00
73 Pasir Cor m3 Rp 160,000.00
74 Paku Klem (No.4) kg Rp 12,500.00
75 Pasir Pasang m3 Rp 151,000.00
76 Pasir Urug m3 Rp 115,500.00
77 Paving abu-abu tbl. 8 cm (4 persegi pj ) m2 Rp 52,500.00
78 Paving merah tbl. 8 cm (4 persegi pj ) m2 Rp 58,300.00
79 kanstin k175 m1 Rp 53,500.00
80 Topi uskup merah tebal 8 cm bh Rp 4,500.00
81 Pipa paralon 5/8" m Rp 9,000.00
82 Pewarna sct Rp 900.00
83 Kran Pelampung Set Rp 150,000.00
84 Pipa PVC Ø 1/2" Type AW m Rp 23,250.00
85 Pipa PVC Ø 3/4" Type AW m Rp 28,200.00
86 Pipa PVC Ø 1" Type AW m Rp 34,850.00
87 Pipa PVC Ø 1 1/2" Type AW m Rp 42,300.00
88 Pipa PVC Ø 2 " Type AW m Rp 50,000.00
89 Pipa PVC Ø 3"AW ljr Rp 150,000.00
90 Pipa PVC Ø 4"AW ljr Rp 200,000.00
91 Pipa PVC Ø 5" AW ljr Rp 250,000.00
92 Pipa PVC Ø 1 1/2" C m Rp 24,500.00
93 Pipa PVC Ø 2" C m Rp 38,900.00
94 Pipa PVC Ø 4" C ljr Rp 259,650.00
95 Pipa PVC Ø 3" C ljr Rp 178,150.00
96 Pipa PVC Ø 5" C ljr Rp 409,450.00
97 Pipa PVC Ø 6" C m Rp 152,450.00
98 Plamur Tembok kg Rp 17,500.00
99 Klem PVC Bh Rp 1,650.00
100 Plywood tebal 9mm lbr Rp 95,000.00
101 Saklar Tunggal Bh Rp 15,000.00
102 Saklar Ganda Bh Rp 22,500.00
103 Serat Fiber m2 Rp 6,000.00
104 Shanding kg Rp 43,200.00
105 Rol (Tba) Roll Rp 8,200.00
106 Rangka Galvalum (Terpasang) m2 Rp 145,000.00
107 Railling pipa stenlist steel ∅ 2,5" m2 Rp 600,000.00
108 Semen Pc 40 kg Zak Rp 52,000.00
109 Semen Pc 50 kg Zak Rp 65,000.00
110 Semen Warna kg Rp 9,000.00
111 Seng BJLS 40 L=60cm m2 Rp 30,250.00
112 Sirtu m3 Rp 143,800.00
113 Slimar Alumunium m1 Rp 28,000.00
114 Solar ltr Rp 11,000.00
115 minyak pelumas ltr Rp 24,000.00
116 Stop Kontak Broco Bh Rp 17,500.00
117 Stopper uskup tbl. 6 cm Bh Rp 6,000.00
118 T doos PVC Bh Rp 2,200.00
119 Teakwood t= 4mm Lbr Rp 45,900.00
120 Tanah Urug m3 Rp 90,000.00
121 Thinner A ltr Rp 25,000.00
122 Woodplank + pemasangan m1 Rp 27,000.00
123 Besi Hollow 4/4 m1 Rp 23,000.00
124 Besi Hollow 2/4 m1 Rp 20,000.00
125 Thinner A Kg Rp 14,000.00
126 Woodplank + pemasangan bh Rp 7,500.00
127 besi Baja Siku L Kg Rp 12,000.00
128 Mur baut Ø 16 mm bh Rp 2,000.00
129 Reng galvalum m1 Rp 16,500.00
130 Usuk galvalum t = 0,8 mm m1 Rp 27,000.00
131 Cat kayu / besi Kg Rp 45,000.00
132 Cat tembok Kg Rp 35,000.00
133 Cat kayu penutup Kg Rp 37,500.00
134 Cat Meni Besi Kg Rp 20,000.00
135 Cat Meni Kayu Kg Rp 20,000.00
136 Plamir kayu Kg Rp 20,000.00
137 Pintu HDF Singgle With Glass Door Bh Rp 675,000.00
138 Pintu HDF Doble with Glass Door Bh Rp 1,330,000.00
139 Kusen Nyatoh Kiln Dried Pintu Doble Bh Rp 800,000.00
140 Kusen Nyatoh Kiln Dried Pintu Single Bh Rp 400,000.00
141 Pintu Kamar mandi WPC Set Rp 830,000.00
142 Pipa PVC 5" typeAW pj. 4 mtr Lonjor Rp 409,450.00
143 Klem PVC Buah Rp 1,650.00
144 Batu Kali Pecah 15/20 M3 Rp 140,000.00
145 Prebal M1 Rp 1,000.00
146 casting Kg Rp 3,000.00
147 Paku Reng Dooz Rp 65,000.00
148 Engsel kuningan pintu Set Rp 20,400.00
149 Engsel kuningan jendela Set Rp 20,400.00
150 Grendel Jendela Bh Rp 9,000.00
151 Kaca Bening t = 10 mm m2 Rp 270,000.00
152 Jarum Keras / Track Stang Bh Rp 7,500.00
153 Genteng Beton Bh Rp 7,500.00
154 Wuwung Genteng beton Bh Rp 21,000.00
155 Cat Genteng Dulux Weathershield Roof Paint 2,5 Kg Kg Rp 65,000.00
156 Avour Bh Rp 21,000.00
157 Sirtu Lokal/songsong m3 Rp 82,500.00
158 Granit m2 Rp 250,000.00
159 Hollow 50 x 50 Lonjor Rp 193,000.00
160 Hollow 30 x 30 Lonjor Rp 89,000.00
161 Hollow 40 x 60 Lonjor Rp 163,000.00
162 Hollow 40x40 Lonjor Rp 91,000.00
163 Hollow 100x50 Lonjor Rp 225,000.00
164 pollycarbonate easy clean m2 Rp 104,000.00
165 Pintu allumunium dengan teralis bh Rp 1,000,000.00
166 Pintu allumunium bh Rp 1,500,000.00
167 Pipa welded hitam 4" Lonjor Rp 215,000.00
168 Wuwung Genteng karang Pilang / Wisma m1 Rp 20,000.00
1 Mandor hr Rp 65,000.00
2 Surveyor Geodesi hr Rp 100,000.00
2 Kepala Tukang Batu hr Rp 62,500.00
3 Kepala Tukang Besi hr Rp 62,500.00
4 Kepala Tukang Cat hr Rp 62,500.00
5 Kepala Tukang Kayu hr Rp 62,500.00
6 Kepala Tukang Listrik hr Rp 62,500.00
7 Kepala Tukang Pipa hr Rp 62,500.00
8 Tukang Batu hr Rp 60,000.00
9 Tukang Besi hr Rp 60,000.00
10 Tukang Cat hr Rp 60,000.00
11 Tukang Kayu hr Rp 60,000.00
12 Tukang Las hr Rp 60,000.00
13 Tukang Listrik hr Rp 60,000.00
14 Tukang Pipa hr Rp 60,000.00
15 Pekerja Terampil hr Rp 59,000.00
16 Pekerja / Buruh Tak Terampil hr Rp 57,206.00
17 Petugas Survey hr Rp 57,206.00
III. PERALATAN
1 Sewa Compresor Jam Rp 35,000.00
2 Sewa alat bantu bor pile set Rp 75,000.00
3 Sewa Alat Bantu ( 1 set @ 3 alat ) jam Rp 1,000.00
4 Sewa Alat Bantu (1 Set @ 3 Alat) jam Rp 1,000.00
ANALISA HARGA SATUAN 2013
Jenis Pekerjaan : Permasangan Paving Stone Blok tb. 8 cm Full Warna Merah
Satuan Pembayaran : M2 Kode : 25.08.01.
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5
file name:420564484.xlsx 5
1 Mandor Hr 0.0250 65,000.00
2 Kepala Tukang Batu Hr 0.0250 62,500.00
3 Tukang Batu Hr 0.0500 60,000.00
4 Pekerja / Buruh Tak Terampil Hr 0.0500 57,206.00
5 Paving Stone Full Warna Merah tb. 8 cm ( 4 perse M2 1.000 58,300.00
file name:420564484.xlsx 6
JUMLAH
( Rp. )
6=4×5
650.00
17,700.00
138,600.00
156,950.00
156,950.00
JUMLAH
( Rp. )
6=4×5
1,625.00
22,882.40
172,560.00
197,067.40
197,065.00
JUMLAH
( Rp. )
6=4×5
1,625.00
1,562.50
3,000.00
2,860.30
52,500.00
61,547.80
61,545.00
JUMLAH
( Rp. )
6=4×5
file name:420564484.xlsx 7
1,625.00
1,562.50
3,000.00
2,860.30
58,300.00
67,347.80
67,345.00
JUMLAH
( Rp. )
6=4×5
65.00
625.00
6,000.00
11,800.00
151.00
15,030.00
33,671.00
33,670.00
JUMLAH
( Rp. )
6=4×5
65.00
1,562.50
3,000.00
2,950.00
815.40
3,692.00
58,850.00
70,934.90
70,930.00
file name:420564484.xlsx 8
ANALISA HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN HARGA
NO. URAIAN KEGIATAN KOEFISIEN SATUAN
(Rp.) (Rp.)
1 Pembuatan Bouwplank (Uietzet) (m1)
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang Kayu 0.0100 O.H 62,500.00 625.00
Tukang kayu 0.1000 O.H 60,000.00 6,000.00
Pekerja / buruh tak terampil 0.1000 650 57,206.00 5,720.60
Bahan/material Jumlah 12,670.60
Kayu meranti (papan 2/20)) 0.0042 m3 5,500,000.00 23,100.00
Besi plat strip 0.0039 18900 14,750.00 57.53
Kayu meranti (usuk 4/6) 0.0039 m3 5,500,000.00 21,450.00
Paku 0.0200 kg 12,500.00 250.00
Jumlah 44,857.53
NILAI HSPK 57,528.13
2 Pembersihan Lapangan Ringan (m2)
Upah
Mandor 0.0025 O.H 65,000.00 162.50
pekerja tak terampil 0.0500 O.H 57,206.00 2,860.30
Jumlah 3,022.80
NILAI HSPK 3,022.80
3 Pembongkaran Penutup Atap dan rangka tidak dipakai kembali (m2)
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Pekerja tak terampil 0.1000 O.H 57,206.00 5,720.60
Jumlah 6,045.60
NILAI HSPK 6,045.60
4 Penggalian Tanah Untuk Konstruksi ( m3 )
Upah
Mandor 0.0250 O.H 65,000.00 1,625.00
Pekerja tak terampil 0.7500 O.H 57,206.00 42,904.50
Jumlah 44,529.50
NILAI HSPK 44,529.50
BAHAN BATU
1 Batu bata tebal 5,5 cm. Bakaran kayu Bh Rp 550.00
2 Batu bata tebal 5,5 cm. Bakaran sekem. Bh Rp 550.00
3 Batu Kali Pecah 15/20 M3 Rp 163,300.00
BAHAN AIR
1 AIR M3 Rp 13.00
BAHAN LANTAI.
1 Keramik lantai 40x40 cm ( KW I ) motif M2 Rp 43,100.00
2 Keramik tegel plint warna/motif 7,5x20 M1 Rp 4,900.00
BAHAN KAYU.
1 Kayu kamfer Slimar M3 Rp 6,500,000.00
2 Kayu Kamper Usuk Rp 6,500,000.00
3 Kayu Kamfer reng 3/5 M3 Rp 6,500,000.00
4 Kayu Kamper balok 6/12, 6/15 M3 Rp 6,500,000.00
5 Kayu Kamper balok 8/12 M3 Rp 6,500,000.00
6 Kayu Kamper 3/30 cm M3 Rp 6,500,000.00
7 Kayu Kamper 1/5cm M1 Rp 3,000.00
8 Kayu meranti balok 8/12, 6/15 M3 Rp 5,500,000.00
9 Keyu meranti usuk 5/7 M3 Rp 5,500,000.00
10 Keyu meranti usuk 3/5 M3 Rp 5,500,000.00
11 Kayu meranti papan 3/25/400 M3 Rp 5,500,000.00
12 Kayu meranti papan 2/20/400 M3 Rp 5,500,000.00
13 Kayu meranti papan 4/30/400 M3 Rp 5,500,000.00
14 Kayu glugu usuk 5/7 4meter 1 Btg Rp 85,000.00
15 Papan begesting (MC) M3 Rp 2,400,000.00
16 Balok kayu borneo M3 Rp 2,000,000.00
17 Balok kayu KW II M3 Rp 2,500,000.00
18 Kayu Jati papan 4/30 M3 Rp 11,000,000.00
19 Kayu Jati balok 6/15 M3 Rp 24,500,000.00
20 Kayu dolken. Btg Rp 11,500.00
21 Kayu Sirap Lbr/ 1m' Rp 57,000.00
BAHAN TRIPLEKS
1 taekwood 1.22x2.44x4mm lbr Rp 65,000.00
2 Lapis triplek 0,4cm lbr Rp 49,000.00
3 Triplek 120.240. x 6 mm lbr Rp 55,000.00
4 Multiplek 120.240. x 9 mm lbr Rp 122,000.00
5 Multiplek 120.240. x 9 mm m2 Rp 45,000.00
6 Triplek lapis formika lbr Rp 75,000.00
7 Triplek tebal 4 mm 1,10 x 2,10 m lbr Rp 40,300.00
BAHAN BESI
1 Besi beton Polos Kg Rp 10,000.00
2 Besi beton Ulir Kg Rp 10,000.00
3 Kawat bendrat Kg Rp 15,300.00
4 Paku triplek/eternit Kg Rp 14,000.00
5 Paku Asbes Kg Rp 14,500.00
6 Paku reng KG Rp 12,500.00
7 Paku usuk KG Rp 12,000.00
8 Paku eternit KG Rp 17,500.00
9 sekrup bh Rp 250.00
10 ripet/sekrup KG Rp 11,000.00
11 Paku Biasa 2"-5" Kg Rp 12,500.00
12 Paku 5 -10 cm KG Rp 11,000.00
13 Paku 12 cm dos Rp 14,500.00
14 Paku klem (no.4) KG Rp 15,000.00
15 Paku klem (no.4) doz Rp 27,100.00
16 Ripet bh Rp 250.00
17 Sealent bh Rp 25,000.00
18 besi Hollow 2/4 m1 Rp 13,500.00
19 besi Hollow 4/4 m1 Rp 20,000.00
20 besi Hollow 5/5 m1 Rp 25,000.00
22 Besi Profil WF Kg Rp 12,000.00
23 besi Baja Siku L Kg Rp 12,000.00
25 Pipa Besi Kg Rp 12,000.00
27 Angkur besi Ø 19 P= 50 cm bh Rp 37,000.00
29 Angkur bh Rp 5,000.00
33 Elektroda las Kg Rp 30,000.00
34 Elektroda baja(20%) Kg Rp 90,650.00
36 Mur baut Ø 16 mm bh Rp 2,000.00
37 Jarum keras bh Rp 7,500.00
38 Reng galvalum m1 Rp 16,500.00
39 Usuk galvalum t = 0,8 mm m1 Rp 27,000.00
40 Aluminium 4" m1 Rp 65,000.00
41 Slimar m1 Rp 19,450.00
BAHAN KACA.
1 Kaca Bening 5 mm m2 Rp 70,000.00
2 Kaca Bening 10 mm m2 Rp 270,000.00
BAHAN PENGGANTUNG & KUNCI
1 Kunci "ALPHA Bulat" 1 x putar Bh Rp 60,000.00
2 Kunci tanam besar 2 x putar kuningan Bh Rp 81,250.00
3 Kunci tanam kecil Bh Rp 37,300.00
4 Engsel kuningan pintu Stel Rp 20,400.00
5 Engsel kuningan jendela Stel Rp 20,400.00
6 Grendel tanam pintu Bh Rp 68,250.00
7 Grendel jendela Bh Rp 9,000.00
8 Hak angin bisa disetel maju/mundur Bh Rp 19,900.00
9 Fitting Plafond Bh Rp 9,750.00
10 Sunscreen m2 Rp 275,000.00
ALAT SEWA
1 Sewa concret mixer 0.50 m3(min 3jam) Jam Rp 20,000.00
2 Sewa Concreate Pump (min 3 jam ) Jam Rp 12,000.00
3 Sewa vibrator roller ( min 5 jam) Jam Rp 8,000.00
4 sewa alat bantu ( 1 set 3 alat ) Jam Rp 30,000.00
5 Sewa crane min 8 jam (ternasuk mob/demo Jam Rp 225,000.00
6 Sewa alat injeksi min 8 jam (ternasuk mob/dem Jam Rp 185,000.00
7 Sewa Welding Set (min 5 jam) hari Rp 40,000.00
BETON
1 Tiang Pancang 20/20 m1 Rp 142,500.00
2 Tiang Pancang 25/25 m1 Rp 180,000.00
DAFTAR HARGA UPAH TENAGA KERJA
1 2 3 4
A. PEKERJAAN PERSIAPAN
C. PEKERJAAN AULA
D. PEKERJAAN GUDANG
H. PEKERJAAN PAVING
M. PEKERJAAN AKHIR
JUMLAH
PPN 10 %
JUMLAH + PPN
DIBULATKAN
TERBILANG :
Satu Milyar Lima Ratus Dua Puluh Lima Juta Enam Ratus Delapan Puluh Satu Ribu Rupiah
ULASI OWNER ESTIMATE
JUMLAH HARGA
3
Rp 10,320,226.77
Rp 188,149,282.68
Rp 622,244,997.57
Rp 269,364,960.10
Rp 66,526,532.10
Rp 35,861,761.19
Rp 13,810,732.62
Rp 125,056,963.47
Rp 9,994,314.96
Rp 2,697,483.68
Rp 3,670,482.34
Rp 37,285,276.92
Rp 2,000,000.00
Rp 1,386,983,014.40
Rp 138,698,301.44
Rp 1,525,681,315.84
Rp 1,525,681,000.00
Surabaya,
KONSULTAN PERENCANA
CV. PERSADA UTAMA
PRIYONO, ST
DIREKTUR
OWNER ESTIMATE (OE)
KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah Daerah
PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya
Jumlah 10,320,226.77
B. PEKERJAAN GEDUNG RUANG KERJA/KANTOR
###
I Pekerjaan Kusen, Pintu dan Jendela
1 Kusen Alumunium 4' 128.96 M1 109,450.00 14,114,672.00
2 Pasang kaca Rayben 5 mm 28.70 M2 98,248.20 2,819,723.34
3 Engsel jendela 21.00 Set 40,076.48 841,606.08
4 Engsel Pintu 5.00 Set 40,076.48 200,382.40
5 Kunci pintu+handel 7.00 Set 111,430.90 780,016.30
6 Grendel Jendela 21.00 Bh 19,632.36 412,279.56
7 Slimar Alumunium 27.36 M1 84,096.75 2,300,887.08
8 Pas. Pintu HDF Singgle 7.00 Bh 1,242,900.00 8,700,300.00
###
II Pekerjaan Pengecatan
1 Pengecatan plafon 488.70 M2 20,941.55 10,234,135.49
2 Cat Listplank 16.46 M2 40,092.50 659,842.37
3 Pengecatan Genteng 214.24 M2 17,741.55 3,800,984.97
4 Pengecatan Dinding 273.84 M2 20,941.55 5,734,634.05
###
III Pekerjaan Instalasi Listrik
1 Instalasi lampu 42.00 M1 158,884.00 6,673,128.00
###
IV Pekerjaan Atap Baja Komposit
1 Kuda kuda WF 150 x 100 x 6 x 9 893.59 Kg 14,850.00 13,269,737.25
2 Gording C 150 x 65 x 20 X 3,2 638.89 Kg 13,750.00 8,784,751.25
3 Plat penyambung WF 255.96 Kg 14,850.00 3,801,006.00
4 Plat plendes t. = 10 mm 25.48 Kg 14,850.00 378,444.01
5 Plat penahan gording besi siku 70 x 70 x 7 mm 259.04 Kg 14,850.00 3,846,714.30
6 Reng/Usuk Galvalume 214.24 M2 189,332.40 40,562,950.09
7 Baut HTB Ø16 mm 392.00 Bh 2,000.00 784,000.00
8 Baut Angkur Ø19 mm 56.00 Bh 67,710.00 3,791,760.00
9 Genteng Beton 42.85 M2 164,100.90 7,031,460.67
10 Bubungan Beton 42.35 M1 109,983.85 4,657,816.05
11 Pas. Besi Track Stang Ø 16mm 200.49 Kg 10,725.00 2,150,244.53
12 Pas. Besi Penghubung gording Ø 10mm 114.96 Kg 10,725.00 1,232,959.73
13 Listplank woodplank 3/30/400 54.86 M3 52,450.00 2,877,407.00
14 Track Stang 15.00 Bh 7,500.00 112,500.00
15 Plat Stifner 8 mm 127.35 Kg 9,750.00 1,241,647.68
16 Perakitan Baja 1,941.27 Kg 264.88 514,193.61
17 Pengelasan Baja 1,941.27 Kg 1,307.00 2,537,238.48
###
V Pekerjaan Plafond
1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow 198.02 M2 135,591.90 26,849,908.04
2 List Plafon gypsum 168.00 M1 20,858.40 3,504,211.20
VI Pekerjaan Talang
1 Pemasangan Talang 26.80 M1 109,990.34 2,947,741.17
Jumlah 188,149,282.68
C. PEKERJAAN AULA
I Pekerjaan Atap Baja Galvalum
1 Reng/Usuk Galvalume 848.03 M2 189,332.40 160,560,123.99
2 Genteng beton 169.61 M2 164,100.90 27,832,595.85
3 Bubungan beton 81.60 M1 109,983.85 8,974,682.16
4 Listplank woodplank 3/30/400 200.52 M3 52,450.00 10,517,274.00
IV Pekerjaan Pengecatan
1 Pengecatan Plafon 804.11 M2 20,941.55 16,839,309.77
2 Pengecatan lisplang 60.16 M2 40,092.50 2,411,804.43
3 Pengecatan dinding 820.00 M2 20,941.55 17,172,071.00
4 Pengecatan Genteng 848.03 M2 17,741.55 15,045,419.95
V Pekerjaan Lantai
Pemasangan
1 Lantai Granit 544.79 M2 359,046.70 195,605,051.69
Urugan
2 pasir bawah lantai t = 10 cm 54.48 M3 156,971.30 8,551,639.45
Jumlah 622,244,997.57
ANALISA HARGA SATUAN POKOK PEKERJAAN
5 1 M2 kusen
pekerja 0.8000 oh
mandor 0.0400 oh
8 1 M3 urugan sirtu
sirtu 1.2000 m3
Pekerja / Buruh Tak Terampil 0.2500 oh
mandor 0.0250 oh
PEK BEKISTING
15 1 m2 acuan / begisting beton untuk Poor
kayu bekisting ( mc ) 0.0450 m3
paku usuk 0.3000 kg
Mimyak begisting 0.1000 ltr
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh
dalam 1 M3 = 8.3333
25 1 M2 pas. Batu bata 1Pc : 5 Ps.
Bata merah 70.0000 bh
semen 50 kg 0.1936 zak
pasir pasang 0.0450 m3
pekerja 0.3000 oh
tukang batu 0.1000 oh
kepala tukang batu 0.0100 oh
mandor 0.0150 oh
dalam 1 M3 = 8.3333
26 1 M2 pas. plesteran 1Pc : 3 Ps ( t: 1.5 cm)
semen 50 kg 0.1555 zak
pasir pasang 0.0200 m3
pekerja 0.3000 oh
tukang batu 0.1500 oh
kepala tukang batu 0.0150 oh
mandor 0.0150 oh
30 1M2 melamin
wood filler 0.2000 kg
pewarna 0.5000 set
kertas gosok no. 150 1.0000 lbr
kertas gosok no. 280 1.0000 lbr
shanding 0.5000 kg
clear doof 0.2000 kg
tinner A special 0.8370 ltr
coumpond 0.2000 kg
sewa alat bantu ( 1 set 3 alat ) 1.0000 set
sewa compresor 0.6250 jam
pekerja 0.0750 oh
tukang cat 0.0900 oh
kepala tukang cat 0.0090 oh
mandor 0.0250 oh
37 1 M3 urugan pasir
pasir urug 1.2000 m3
Pekerja / Buruh Tak Terampil 0.3000 oh
mandor 0.0100 oh
38 1 M2 pas. Keramik lantai 40x40 cm
keramik 40x40 motif 1.0683 M2
Semen portland 50kg 0.1960 zak
Pasir pasang 0.0450 m3
Semen warna 1.3000 Kg
Pekerja 0.7000 oh
Tukang batu 0.3500 oh
Kepala tukang 0.0350 oh
Mandor 0.0350 oh
52 1 bh lampu SL 10 watt
lampu SL 14 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh
53 1 bh lampu SL 18 watt
lampu SL 18 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh
54 1 bh lampu SL 23 watt
lampu SL 23 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh
63 1 m1 kabel grounding BC 50 mm
Kabel grounding 10 mm 1.0000 m1
pekerja 0.1000 oh
tukang 0.0500 oh
kepala tukang 0.0500 oh
Rp 5,500,000.00 Rp 44,000.00
Rp 5,500,000.00 Rp 66,000.00
Rp 12,000.00 Rp 600.00
Rp 57,206.00 Rp 5,720.60
Rp 60,000.00 Rp 6,000.00
Rp 62,500.00 Rp 625.00
Rp 65,000.00 Rp 292.50
Jumlah Rp 123,238.10
Rp 42,500.00 Rp 4,250.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 4,575.00
Rp 42,500.00 Rp 3,825.00
Rp 65,000.00 Rp 2,925.00
Jumlah Rp 6,750.00
2+3 Rp 11,325.00
Rp 41,900.00 Rp 10,475.00
Rp 65,000.00 Rp 6,500.00
Jumlah Rp 16,975.00
Rp 42,500.00 Rp 34,000.00
Rp 65,000.00 Rp 2,600.00
Jumlah Rp 36,600.00
Rp 42,500.00 Rp 8,500.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 3,000.00
Rp 65,000.00 Rp 162.50
Jumlah Rp 17,162.50
4+5+6 Rp 70,737.50
Rp 41,900.00 Rp 1,340.80
Rp 65,000.00 Rp 65,000.00
Jumlah Rp 66,340.80
Rp 75,000.00 Rp 90,000.00
Rp 41,900.00 Rp 10,475.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 102,100.00
60,000.00 2,340.00
55,000.00 2,145.00
50,000.00 19,500.00
30,000.00 23,400.00
163,300.00 195,960.00
133,400.00 57,628.80
Jumlah Rp 300,973.80
60,000.00 4,500.00
55,000.00 4,125.00
50,000.00 37,500.00
30,000.00 45,000.00
55,800.00 181,908.00
144,900.00 75,348.00
163,300 195,960.00
Jumlah Rp 539,841.00
Rp 60,000.00 Rp 2,700.00
Rp 55,000.00 Rp 16,500.00
Rp 50,000.00 Rp 5,000.00
Rp 30,000.00 Rp 19,800.00
Rp 55,800.00 Rp 18,414.00
Rp 144,900.00 Rp 4,781.70
Rp 163,300.00 Rp 5,388.90
Jumlah Rp 72,584.60
Rp 48,500.00 Rp 223,100.00
Rp 145,000.00 Rp 80,924.50
Rp 140,000.00 Rp 75,670.00
Rp 13.00 Rp 2,795.00
Rp 42,500.00 Rp 51,000.00
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 1,200.00
Rp 65,000.00 Rp 3,900.00
Jumlah Rp 449,589.50
Rp 10,000.00 Rp 10,500.00
Rp 15,300.00 Rp 229.50
Rp 59,000.00 Rp 413.00
Rp 60,000.00 Rp 420.00
Rp 62,500.00 Rp 43.75
Rp 65,000.00 Rp 22.75
Jumlah Rp 11,629.00
Rp 10,000.00 Rp 10,500.00
Rp 15,300.00 Rp 229.50
Rp 59,000.00 Rp 413.00
Rp 60,000.00 Rp 420.00
Rp 62,500.00 Rp 43.75
Rp 65,000.00 Rp 22.75
Jumlah Rp 11,629.00
Rp 2,400,000.00 Rp 108,000.00
Rp 12,000.00 Rp 3,600.00
Rp 4,800.00 Rp 480.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 175,027.50
x Rp 181,935.00
Rp 2,400,000.00 Rp 108,000.00
Rp 12,000.00 Rp 3,600.00
Rp 4,800.00 Rp 480.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 175,027.50
x Rp 181,935.00
Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 82,500.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 23,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 312,907.50
x Rp 250,875.00
x Rp 272,162.50
x Rp 314,280.00
Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 99,000.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 23,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 329,407.50
x Rp 259,125.00
x Rp 277,662.50
x Rp 318,405.00
Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 82,500.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 69,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 358,907.50
x Rp 273,875.00
x Rp 325,780.00
Rp 59,000.00 Rp 118,000.00
Jumlah Rp 118,000.00
Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 2,204,010.57
Rp 156,690.00 Rp 1,044,605.22
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,018,984.16
Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 2,810,485.06
Rp 225,630.00 Rp 785,666.22
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,366,519.65
Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 1,712,968.84
Rp 233,880.00 Rp 1,559,207.80
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,042,545.00
Rp 550.00 Rp 38,500.00
Rp 60,625.00 Rp 17,423.63
Rp 130,000.00 Rp 5,200.00
Rp 41,900.00 Rp 12,570.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 80,768.63
X Rp 673,069.18
Rp 550.00 Rp 38,500.00
Rp 60,625.00 Rp 11,737.00
Rp 130,000.00 Rp 5,850.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 75,912.00
X Rp 632,597.47
Rp 60,625.00 Rp 9,427.19
Rp 130,000.00 Rp 2,600.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 34,902.19
Rp 60,625.00 Rp 6,280.75
Rp 130,000.00 Rp 3,120.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 32,275.75
Rp 48,500.00 Rp 3,940.63
Rp 42,500.00 Rp 8,500.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 19,190.63
Rp 48,500.00 Rp 606.25
Rp 130,000.00 Rp 1,690.00
Rp 55,000.00 Rp 6,600.00
Jumlah Rp 8,896.25
Rp 35,000.00 Rp 7,000.00
Rp 7,000.00 Rp 3,500.00
Rp 5,000.00 Rp 5,000.00
Rp 5,000.00 Rp 5,000.00
Rp 35,000.00 Rp 17,500.00
Rp 47,000.00 Rp 9,400.00
Rp 10,200.00 Rp 8,537.40
Rp 15,000.00 Rp 3,000.00
Rp 1,250.00 Rp 1,250.00
Rp 1,250.00 Rp 781.25
Rp 42,500.00 Rp 3,187.50
Rp 55,000.00 Rp 4,950.00
Rp 60,000.00 Rp 540.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 71,271.15
Rp 5,000.00 Rp 2,500.00
Rp 11,220.00 Rp 7,405.20
Rp 2,500.00 Rp 85.00
Rp 55,000.00 Rp 48,400.00
Jumlah Rp 58,390.20
Rp 20,000.00 Rp 3,000.00
Rp 17,500.00 Rp 5,250.00
Rp 45,000.00 Rp 9,000.00
Rp 37,500.00 Rp 11,250.00
Rp 42,500.00 Rp 2,975.00
Rp 55,000.00 Rp 5,775.00
Rp 60,000.00 Rp 240.00
Rp 65,000.00 Rp 162.50
Jumlah Rp 37,652.50
Rp 35,000.00 Rp 6,300.00
Rp 5,600.00 Rp 672.00
Rp 42,500.00 Rp 1,190.00
Rp 55,000.00 Rp 2,310.00
Rp 60,000.00 Rp 252.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 12,349.00
Rp 15,000.00 Rp 1,500.00
Rp 5,000.00 Rp 2,500.00
Rp 42,500.00 Rp 850.00
Rp 55,000.00 Rp 1,650.00
Rp 60,000.00 Rp 180.00
Rp 65,000.00 Rp 65.00
Jumlah Rp 6,745.00
Rp 6,745.00 Rp 6,745.00
Rp 12,349.00 Rp 12,349.00
Jumlah Rp 19,094.00
Rp 20,000.00 Rp 2,000.00
Rp 6,500.00 Rp 65.00
Rp 42,500.00 Rp 850.00
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 1,200.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 15,765.00
Rp 105,000.00 Rp 126,000.00
Rp 41,900.00 Rp 12,570.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 139,220.00
Rp 43,100.00 Rp 46,043.73
Rp 60,625.00 Rp 11,882.50
Rp 130,000.00 Rp 5,850.00
Rp 9,000.00 Rp 11,700.00
Rp 42,500.00 Rp 29,750.00
Rp 55,000.00 Rp 19,250.00
Rp 60,000.00 Rp 2,100.00
Rp 65,000.00 Rp 2,275.00
Jumlah Rp 128,851.23
Rp 37,100.00 Rp 39,326.00
Rp 60,625.00 Rp 12,610.00
Rp 130,000.00 Rp 5,850.00
Rp 9,000.00 Rp 14,580.00
Rp 42,500.00 Rp 29,750.00
Rp 55,000.00 Rp 19,250.00
Rp 60,000.00 Rp 2,100.00
Rp 65,000.00 Rp 2,275.00
Jumlah Rp 125,741.00
Rp 37,100.00 Rp 38,955.00
Rp 60,625.00 Rp 11,276.25
Rp 130,000.00 Rp 2,340.00
Rp 9,000.00 Rp 17,460.00
Rp 42,500.00 Rp 38,250.00
Rp 55,000.00 Rp 24,750.00
Rp 60,000.00 Rp 2,700.00
Rp 65,000.00 Rp 2,925.00
Jumlah Rp 138,656.25
Rp 4,900.00 Rp 25,725.00
Rp 60,625.00 Rp 138.23
Rp 130,000.00 Rp 390.00
Rp 9,000.00 Rp 225.00
Rp 42,500.00 Rp 3,825.00
Rp 55,000.00 Rp 4,950.00
Rp 60,000.00 Rp 540.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 36,118.23
Rp 65,000.00 Rp 65,000.00
Rp 6,500,000.00 Rp 127,400.00
Rp 9,000.00 Rp 2,700.00
Rp 15,000.00 Rp 4,500.00
Rp 42,500.00 Rp 25,500.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 1,950.00
Jumlah Rp 349,050.00
Err:509 Err:509
Rp 42,500.00 Rp 637.50
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 52.00
Err:509
Rp 6,500,000.00 Rp 7,800,000.00
Rp 15,000.00 Rp 18,750.00
Rp 10,000.00 Rp 10,000.00
Rp 42,500.00 Rp 255,000.00
Rp 55,000.00 Rp 990,000.00
Rp 60,000.00 Rp 108,000.00
Rp 65,000.00 Rp 19,500.00
Jumlah Rp 9,201,250.00
Rp 6,500,000.00 Rp 156,000.00
Rp 10,000.00 Rp 3,000.00
Rp 42,500.00 Rp 34,000.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 2,600.00
Jumlah Rp 317,600.00
Rp 6,500,000.00 Rp 260,000.00
Rp 12,500.00 Rp 625.00
Rp 42,500.00 Rp 42,500.00
Rp 55,000.00 Rp 165,000.00
Rp 60,000.00 Rp 18,000.00
Rp 65,000.00 Rp 3,250.00
Jumlah Rp 489,375.00
Rp 70,000.00 Rp 77,000.00
Rp 42,500.00 Rp 637.50
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 52.00
Jumlah Rp 86,839.50
Rp 450,000.00 Rp 450,000.00
Rp 42,500.00 Rp 25,500.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 1,950.00
Jumlah Rp 599,450.00
Rp 15,000.00 Rp 150,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 20,000.00
Rp 350.00 Rp 350.00
Rp 750.00 Rp 750.00
Rp 10,000.00 Rp 10,000.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 27,500.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 230,850.00
Rp 17,500.00 Rp 17,500.00
Rp 15,000.00 Rp 150,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 5,000.00
Rp 750.00 Rp 750.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 193,792.50
Rp 45,000.00 Rp 45,000.00
Rp 15,000.00 Rp 225,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 50,000.00
Rp 350.00 Rp 2,100.00
Rp 750.00 Rp 1,500.00
Rp 42,500.00 Rp 42,500.00
Rp 55,000.00 Rp 55,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 430,600.00
Rp 32,000.00 Rp 32,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 46,042.50
Rp 35,000.00 Rp 35,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 49,042.50
Rp 45,000.00 Rp 45,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 59,042.50
Rp 15,000.00 Rp 15,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 29,042.50
Rp 25,000.00 Rp 25,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 39,042.50
Rp 5,500,000.00 Rp 5,500,000.00
Rp 684,500.00 Rp 684,500.00
Rp 40,000.00 Rp 520,000.00
Rp 978,000.00 Rp 978,000.00
Rp 19,500.00 Rp 117,000.00
Rp 150,000.00 Rp 150,000.00
Jumlah Rp 5,650,000.00
Rp 1,055,000.00 Rp 1,055,000.00
Rp 42,500.00 Rp 21,250.00
Rp 55,000.00 Rp 13,750.00
Rp 60,000.00 Rp 6,000.00
Jumlah Rp 1,096,000.00
Rp 800,000.00 Rp 800,000.00
Rp 25,000.00 Rp 100,000.00
Rp 42,500.00 Rp 38,250.00
Rp 55,000.00 Rp 24,750.00
Rp 60,000.00 Rp 15,000.00
Jumlah Rp 978,000.00
Rp 35,000.00 Rp 35,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 45,000.00
Rp 9,500.00 Rp 9,500.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 19,500.00
Rp 50,000.00 Rp 50,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 60,000.00
Rp 40,000.00 Rp 40,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 50,000.00
Rp 65,000.00 Rp 13,000.00
Rp 62,500.00 Rp 75,000.00
Rp 60,000.00 Rp 720,000.00
Rp 60,000.00 Rp 240,000.00
Rp 6,500,000.00 Rp 7,150,000.00
Rp 12,000.00 Rp 180,000.00
Rp 27,100.00 Rp 151,760.00
Jumlah Rp 7,721,760.00
Rp 60,000.00 Rp 300.00
Rp 60,000.00 Rp 600.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 6,500,000.00 Rp 46,800.00
Rp 5,500,000.00 Rp 77,000.00
Rp 12,500.00 Rp 3,125.00
Jumlah Rp 132,825.00
Rp 65,000.00 Rp 325.00
Rp 62,500.00 Rp 625.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 6,500,000.00 Rp 46,800.00
Rp 12,000.00 Rp 168.00
Rp 12,500.00 Rp 3,125.00
Jumlah Rp 55,993.00
Rp 5,500.00 Rp 137,500.00
Rp 42,500.00 Rp 6,375.00
Rp 55,000.00 Rp 4,125.00
Rp 60,000.00 Rp 480.00
Rp 65,000.00 Rp 520.00
Jumlah Rp 149,000.00
Rp 65,000.00 Rp 325.00
Rp 62,500.00 Rp 625.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 5,500,000.00 Rp 39,600.00
Rp 65,000.00 Rp 16,250.00
Jumlah Rp 61,750.00
Rp 6,500.00 Rp 7,475.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 15,185.00
Rp 70,000.00 Rp 70,000.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 77,710.00
Rp 60,000.00 Rp 60,000.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 67,710.00
Rp 16,500.00 Rp 90,750.00
Rp 27,000.00 Rp 59,400.00
Rp 7,650.00 Rp 7,650.00
Rp 59,000.00 Rp 23,600.00
Rp 60,000.00 Rp 6,000.00
Rp 62,500.00 Rp 625.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 188,350.00
Rp 3,000.00 Rp 75,000.00
Rp 59,000.00 Rp 8,850.00
Rp 60,000.00 Rp 4,500.00
Rp 62,500.00 Rp 500.00
Rp 65,000.00 Rp 520.00
Jumlah Rp 89,370.00
Rp 81,250.00 Rp 243,750.00
Rp 17,500.00 Rp 2,800.00
Rp 11,500.00 Rp 371.45
Rp 59,000.00 Rp 23,600.00
Rp 60,000.00 Rp 12,000.00
Rp 62,500.00 Rp 1,250.00
Rp 65,000.00 Rp 130.00
Jumlah Rp 283,901.45
Rp 65,000.00 Rp 877.50
Rp 62,500.00 Rp 2,500.00
Rp 60,000.00 Rp 24,000.00
Rp 59,000.00 Rp 15,930.00
Rp 5,500,000.00 Rp 126,500.00
Rp 40,300.00 Rp 15,717.00
Rp 17,500.00 Rp 1,050.00
Jumlah Rp 159,197.00
Rp 9,000.00 Rp 9,000.00
Rp 30,000.00 Rp 30,000.00
Rp 11,000.00 Rp 550.00
Rp 59,000.00 Rp 8,850.00
Rp 60,000.00 Rp 15,000.00
Rp 62,500.00 Rp 1,562.50
Rp 65,000.00 Rp 4,875.00
Jumlah Rp 30,287.50
ANALISA VOLUME
KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah Daerah
PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Mobilisasi dan Demobilisasi Ls 1.00
2 Bongkaran penutup atap gedung existing + rangka m2 488.70
3 Bongkaran plafon. m2 488.70
4 Pembuatan Direksi kit ls 1.00
5 Pembuatan Bowplang m2 42.31 42.31
6 Pembersihan Lapangan Ringan m2 488.70
B PEKERJAAN GEDUNG RUANG KERJA/KANTOR
I Pekerjaan Kusen Pintu dan Jendela
1 Kusen Alumunium 4' M1 128.96 128.96
2 Pasang kaca Rayben 5 mm M2 28.70 4.10
3 Engsel jendela Set 21.00
4 Engsel Pintu Set 5.00
5 Kunci pintu+handel Set 7.00
6 Grendel Jendela Bh 21.00
7 Slimar Alumunium M1 27.36 27.36
8 Pas. Pintu HDF Singgle Bh 7.00
II Pekerjaan Pengecatan
1 Pengecatan plafon M2 488.70 488.70
2 Pengecatan Listplang M2 16.46 54.86 0.3
3 Pengecatan Genteng M2 214.24
4 Pengecatan Dinding M2 273.84
III Pekerjaan Instalasi Listrik
1 Instalasi lampu Titik 42.00
V Pekerjaan Plafond
1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow M2 198.02 198.02
2 List Plafon gypsum M1 168.00 168.00
VI Pekerjaan Talang
1 Pemasangan Talang M1 26.80
IV Pekerjaan Pengecatan
1 Pengecatan Plafon M2 804.11 804.11
2 Pengecatan lisplang M2 60.16 60.16 200.52 0.30
3 Pengecatan dinding M2 820.00 820.00 82.00 5.00
4 Pengecatan Genteng M2 848.03 848.03
V Pekerjaan Lantai
1 Pemasangan Lantai Granit M2 544.79 34.70 15.70
2 Urugan pasir bawah lantai t = 10 cm M3 54.48 0.10
D. PEKERJAAN GUDANG
I Pekerjaan Tanah dan Pondasi
1 Pekerjaan galian tanah M3 47.8023 46.5003 1.65 1.65 1.22
1.302 43.4 0.15 0.2
2 Urugan pasir M3 3.8115 0.27225 1.65 1.65 0.1
3 Pemasangan batu kali belah kosong (aanstamping) M3 2.8 0.2 1 1 0.2
4 Pemasangan batu kali belah 15/20 cm (1 Pc : 4 Ps ) M3 9.072 0.648
5 Pengurugan Kembali M3 32.1188
IX Pekerjaan Plafond
1 Pemasangan Plafond Eternit Rangka hollow M2 166.97
2 List Plafon gypsum M1 183.25
II Pekerjaan Pintu
1 Pas. Pintu WPC Singgle Bh 2.00
VI Pekerjaan Plafond
1 Pemasangan Plafond Eternit Rangka hollow M2 38.70
2 List Plafon gypsum M1 33.80
IX Pekerjaan Sanitair
1 Pipa pembuang air wudlu dan kamar mandi m1 7.60
2 Pek. WC Duduk Bh 2.00
3 Kran Air Bh 12.00
4 Pipa Air Bersih m1 21.40
5 Pas. Avour Bh 4.00
H PEKERJAAN PAVING
A. PAVING LAPANGAN SEPAK BOLA
1 Pek. Pebersihan Paving lama m2 314.64 20.70 15.20
2 Pas. Paving K-350 Tb. 8 Cm m2 292.42
3 Pas. Topi Uskup K-350 Tb. 8 Cm m2 8.14 69.60
4 Pas. Strecher k-350 Tb. 8 Cm m2 14.08 70.40 0.20
5 Pas. Kanstin K-175 m1 71.20 71.20
6 Urugan Sirtu m3 31.46 20.70 15.20 0.10
7 Pasir Pasang m3 15.73 20.70 15.20 0.05
M PEKERJAAN AKHIR
1 Air kerja Ls 1.00
2 Pembersihan Akhir Ls 1.00
DIAMETER JUMLAH BERAT
7
21
5
21
21.1
4.82
21.33
14 80.903
54 7.38
1.570
0.61
224 64.72
48
48
24
2.00
14
14
14
14
14
12
2
2.00
21.1
4.82
21.33
16.00 80.903
88.00 7.38
1.570
0.61
320.00 64.72
21.1
4.82
21.33
4.00 80.903
7.38
1.57
0.6128
20.00 64.722222
8.00 19.8/lnjr
13.94/lnjr
2.00
14.00 12.8/lnjr
6.61/lnjr
2.68
13.18
8.89
24.02
13.18
8.89
6.00
Nama Kegiatan : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah
Nama Pekerjaan : Rehabilitasi UPTD Asrama Bibit Unggul
Lokasi Pekerjaan : Villa Kalijudan Indah XV Kav. 2-4 Surabaya
BOBOT BULAN I
NO URAIAN PEKERJAAN (%) MINGGU KE
1
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Mobilisasi dan Demobilisasi 0.036 0.036
2 Bongkaran penutup atap gedung existing + rangka 0.213 0.213
3 Bongkaran plafon. 0.213 0.213
4 Pembuatan Bowplang 0.175 0.175
5 Pembersihan Lapangan Ringan 0.107 0.107
C. PEKERJAAN AULA
1 Pekerjaan Atap Baja Galvalum 14.988
2 Pekerjaan Kusen, Pintu dan Jendela 3.335
3 Pekerjaan Plafon 8.109
4 Pekerjaan Pengecatan 3.711
5 Pekerjaan Lantai 14.719
D PEKERJAAN GUDANG
1 Pekerjaan Tanah dan Pondasi 0.663
2 Pekerjaan Struktur dan Beton 2.031
3 Pekerjaan Pasangan dan Plesteran 1.020
4 Pekerjaan Lantai dan Keramik 0.846
5 Pekerjaan Kusen Pintu dan Jendela 1.484
6 Pekerjaan Pengecatan 0.862
7 Pekerjaan Instalasi Listrik 0.281
8 Pekerjaan Atap Baja Komposit 10.326
9 Pekerjaan Plafond 1.908
H PEKERJAAN PAVING
1 A. PAVING LAPANGAN SEPAK BOLA 2.593
2 B. PAVING LAPANGAN BERMAIN 1.625
3 C. PAVING LAPANGAN DEPAN MASJID 4.798
0.212
0.043
0.118
0.025
0.761
0.129
0.043
0.003
0.105
3.391 4.748 4.070 8.973 10.915 11.886 12.857 12.857 5.323
5.492 10.240 14.309 23.282 34.197 46.083 58.939 71.796 77.119
BULAN III BULAN III
MINGGU KE MINGGU KE KET
11 12 13 14 15 16
0.744
100%
13.565
75%
44.863
0.099
0.305
0.153 50%
0.127
0.223
0.129
0.042
1.549
0.286 19.421
0.282 0.212
0.058 0.043
0.157 0.118
0.034 0.025
1.014 0.761
0.172 0.129
0.058 0.043 25%
0.004 0.003
0.141 0.105 4.796
0.697 0.299
1.685 0.907
1.138 0.488
1.200 1.440 2.159 9.016
0.721
0.194 0.194
0.265 0.265
2.688 2.688
0.144 0% 0.144
6 28 57 85
8 50 101 151
10 79 157 236
12 113 226 339
14 154 308 462
16 201 402 603
19 284 567 851
20 314 629 943
22 380 761 1141
25 491 982 1473
28 616 1232 1848
32 805 1609 2414
6 28 0.22 0.44
8 50 0.39 0.78
10 79 0.61 1.23
12 113 0.88 1.77
14 154 1.20 2.40
16 201 1.57 3.14
19 284 2.21 4.42
20 314 2.45 4.90
22 380 2.97 5.93
25 491 3.83 7.66
28 616 4.80 9.61
32 805 6.28 12.55
BESI PLAT t = 10 MM
ITEM SATUAN
BESI PLAT t = 10 MM 1 LBR
PERBANDINGAN
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 8
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )
ITEM
KOLOM / BALOK 0.08 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )
POOR c
P L T
PLAT 1 2 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0
POOR a dan b
P L T
PLAT 1 1 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0
SLOOF1
ITEM
KOLOM / BALOK 0.25 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 0.60
K1
P L T VOLUME M3 / M1
0.2 0.2 1.00 0.04
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.58 8 316.00
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.125 0.3
kp
P L T VOLUME M3 / M1
0.12 0.12 1.00 0.01
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.39 4 108.94
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.22 0.15 0.14
BT 6
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.50
bl
P L T VOLUME M3 / M1
0.12 0.2 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 4 147.07
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14
BT1
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.50
BT2
ITEM
KOLOM / BALOK 0.2 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.30
BT3
ITEM
KOLOM / BALOK 0.35 0.7
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 2.00
BT4
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.50
BT5
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.20
BT6
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.00
HAK X (2) P METER / BH
0.10 1.50
BT7
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.20
BT8
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 3
JUMLAH BESI TUL POKOK( LAJUR ) 2
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.20
BT9
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.50
BT10
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.20
BG
ITEM
KOLOM / BALOK 0.15 0.2
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.60
plat tangga t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0
plat tandon t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0
k5
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 62.75
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
k6
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
k7
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 78.44
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
KT 10 10-100
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 6 114.90
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.1 0.06
BB3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
BB4
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B1
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B1A
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B2
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B4
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B5
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B6
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.20
B7
ITEM
KOLOM / BALOK 0.25 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40
B8
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B9
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B10
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B11
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.60
B12 D 13 8-150
ITEM
KOLOM / BALOK 0.15 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.80
B BORDES D 13 8-150
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 8
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
BL 10 8-150
P L T VOLUME M3 / M1
0.12 0.15 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 136.18
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14
PLAT st 1 12-150
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 1
0.88 0.025 0.15 1
0.00 0 0 0
ESI PLAT t = 10 MM
SATUAN
KG
KG
PERBANDINGAN
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR VOLUME KG / M3
5 130.73
2 29.41
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.15 0.35 0.55 0.10
JUMLAH BEGEL / M3 VOLUME KG / M3
112.11 43.97
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
JULMAH LJR VOLUME KG / M3
6 114.90
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.1 0.11 0.75 0.10
VOLUME M3 / M2 P M2 / M3
0.60 1.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20.00 0.025 1.225 64.52
40.00 0.025 2.225 234.37
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.30 3.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20 0.025 1.225 129.03
20 0.025 1.225 129.03
0 0 0 0.00
P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 316.00
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.2 0.30
JUMLAH BEGEL / M3 VOLUME KG / M3 386.4020
191.48 70.40 425.0422
P METER / M3 402.2210 KG
25.00 442.4431 ples 10%
P METER / M3 147.8367 KG
69.44 162.6204 ples 10%
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 52.67
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 138.4515
54.33 71.92 152.2967
P METER / M3 206.1126 KG
41.67 226.7238 ples 10%
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
8.5 1.58 89.53
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 134.9592
34.33 31.56 148.4551
P L T VOLUME M3 / M1
0.2 0.5 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 63.20
2 1.04 20.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.3 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 130.3189
58.14 46.32 143.3508
P L T VOLUME M3 / M1
0.35 0.7 1.00 0.25
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
13 2.23 118.33
4 1.04 16.98
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.6 1.30
JUMLAH BEGEL / M3 VOLUME KG / M3 178.2340
24.32 42.93 196.0574
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 68.47
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1125 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 137.7236
60.26 55.39 151.4960
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 79.00
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 164.7724
81.00 85.77 181.2496
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 52.67
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 66.5333
39.10 0.00 73.1867
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 71.10
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 113.8559
58.14 42.76 125.2415
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.04 52.00
1.04 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1375 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 130.0712
73.73 78.07 143.0783
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
8 2.23 118.93
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1375 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 198.3005
49.48 65.50 218.1306
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 79.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1125 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 145.1007
89.89 66.10 159.6108
P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 0.88 117.66
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.30
JUMLAH BEGEL / M3 VOLUME KG / M3 170.1852
223.22 52.53 187.2037
VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10.00 0.025 1.045 53.36
10.00 0.025 1.045 53.36
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.08 12.50
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.67 0.025 1.005 51.32
6.67 0.025 1.005 51.32
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 84.32
13.33 0.025 1.075 58.56
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 58.56
13.33 0.025 1.075 58.56
0 0 0 0.00
P METER / M3 82.9486 KG
6.67 91.2435 ples 10%
P METER / M3 128.9832 KG
11.11 141.8816 ples 10%
P METER / M3 100.1920 KG
8.33 110.2112 ples 10%
P METER / M3 229.0140 KG
33.33 251.9154 ples 10%
P METER / M3 280.1170 KG
31.25 308.1287 ples 10%
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 2.23 133.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.115 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 203.3857
58.97 57.82 223.7242
P L T VOLUME M3 / M1
0.3 0.45 1.00 0.14
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 70.22
2 0.88 13.07
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.5 0.80
JUMLAH BEGEL / M3 VOLUME KG / M3 120.8187
68.34 37.52 132.9006
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 152.7493
134.33 47.42 168.0243
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11.5 2.23 170.97
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.105 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 245.9656
64.49 63.23 270.5622
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11 2.23 163.53
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 235.7026
61.61 60.40 259.2729
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 88.88
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 160.3912
114.64 49.46 176.4303
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 217.1818
167.67 59.18 238.9000
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 144.9055
112.11 39.57 159.3961
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 102.70
2 0.88 17.65
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 163.6039
91.91 43.26 179.9642
P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7.5 1.58 94.80
2 0.88 14.12
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 149.4003
73.73 40.48 164.3403
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5.5 1.58 144.83
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 192.2493
134.33 47.42 211.4743
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7 1.58 138.25
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.07 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 237.7799
179.57 77.47 261.5579
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 131.67
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 190.8484
167.67 59.18 209.9333
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 1.58 94.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 145.2240
61.61 38.66 159.7464
P L T VOLUME M3 / M1
0.15 0.3 1.00 0.05
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.04 92.44
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 139.2402
149.15 46.80 153.1642
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 205.4160
134.33 47.42 225.9576
P METER / M3 200.2631 KG
55.56 220.2894 ples 10%
P METER / M3 285.0137 KG
8.00 313.5150 ples 10%
VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.045 71.15
13.3333333333 0.025 1.045 45.54
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.05 19.23
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10 0.025 1.005 118.44
4.3333333333 0.025 0.655 33.45
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 99.38
13.3333333333 0.025 1.075 37.48
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.6666666667 0.025 1.075 42.16
6.6666666667 0.025 1.075 42.16
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 84.32
13.3333333333 0.025 1.075 84.32
0 0 0 0.00
8 9 10
20 22
6286 7606
4190 5070
3143 3803
2514 3042
2095 2535
1796 2173
1571 1901
1397 1690
1257 1521
1143 1383
1048 1268
20
12571
8381
6286
5029
4190
3592
3143
2794
2514
2286
2095
g(m)
7 8 9
0.00786
untuk panjang ( m )
7 8 9
1.54 1.76 1.99
2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
7.25 8.29 9.32
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.69
26.81 30.64 34.47
33.63 38.43 43.24
43.93 50.20 56.48
GUGUR
LULUS
P METER / M3
16.67
P METER / BH
1.00
KG
ples 10%
P METER / M3
31.25
KG
ples 10%
JUMLAH BEGEL / M3 VOLUME KG / M3
54.08 25.43
P METER / M3
33.33
KG
ples 10%
VOL KG / M3
86.22
VOL KG / M3
38.89
P METER / M3
6.67
KG
ples 10%
VOL KG / M3
59.04
P METER / M3
6.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
4.08
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
33.33
KG
ples 10%
VOL KG / M3
20.20
11.6085
VOL KG / M3
24.40
12.0230
VOL KG / M3
21.75
VOL KG / M3
52.53
VOL KG / M3
165.22
P METER / M3
6.67
KG
ples 10%
P METER / M3
7.41
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
8.00
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
22.22
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
VOL KG / M3
64.09
VOL KG / M3
46.61
6 28 57 85
8 50 101 151
10 79 157 236
12 113 226 339
14 154 308 462
16 201 402 603
19 284 567 851
20 314 629 943
22 380 761 1141
25 491 982 1473
28 616 1232 1848
32 805 1609 2414
6 28 0.22 0.44
8 50 0.39 0.78
10 79 0.61 1.23
12 113 0.88 1.77
14 154 1.20 2.40
16 201 1.57 3.14
19 284 2.21 4.42
20 314 2.45 4.90
22 380 2.97 5.93
25 491 3.83 7.66
28 616 4.80 9.61
32 805 6.28 12.55
BESI PLAT t = 10 MM
ITEM SATUAN
BESI PLAT t = 10 MM 1 LBR
PERBANDINGAN
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 8
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )
ITEM
KOLOM / BALOK 0.08 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )
POOR 1
P L T
PLAT 1.2 1.2 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0
POOR 2
P L T
PLAT 0.8 0.8 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0
SLOOF1
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
SLOOF2 dan 3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
K1
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 10 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
K2
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 8 139.45
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
K3
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 8 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
kp
P L T VOLUME M3 / M1
0.12 0.12 1.00 0.01
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 170.22
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14
b tangga = b4
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 4.5 117.66
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.3
bl
P L T VOLUME M3 / M1
0.12 0.2 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 4 147.07
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14
b2 dan b3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
b1
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70
b5
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70
KS1
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70
plat tangga t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.1 2
0.61 0.025 0.1 2
0.00 0 0 0
plat tandon t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0
k5
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 62.75
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
k6
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
k7
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 78.44
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5
KT 10 10-100
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 6 114.90
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.1 0.06
BB2
ITEM
KOLOM / BALOK 0.3 0.45
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40
BB3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
BB4
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B1
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B1A
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B2
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B4
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B5
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B6
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.20
B7
ITEM
KOLOM / BALOK 0.25 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40
B8
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B9
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B10
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B11
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.60
B12 D 13 8-150
ITEM
KOLOM / BALOK 0.15 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.80
B BORDES D 13 8-150
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 8
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
BL 10 8-150
P L T VOLUME M3 / M1
0.12 0.15 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 136.18
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14
PLAT st 1 12-150
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 1
0.88 0.025 0.15 1
0.00 0 0 0
ESI PLAT t = 10 MM
SATUAN
KG
KG
PERBANDINGAN
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR VOLUME KG / M3
5 130.73
2 29.41
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.15 0.35 0.55 0.10
JUMLAH BEGEL / M3 VOLUME KG / M3
112.11 43.97
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
JULMAH LJR VOLUME KG / M3
6 114.90
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.1 0.11 0.75 0.10
VOLUME M3 / M2 P M2 / M3
0.43 2.31
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
24.00 0.025 1.425 125.08
24.00 0.025 1.425 125.08
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.19 5.21
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
16 0.025 1.025 134.96
16 0.025 1.025 134.96
0 0 0 0.00
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.57 117.66
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 147.4250
84.33 29.77 162.1675
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 135.1007
84.33 29.77 148.6108
P METER / M3 124.7824 KG
6.67 137.2607 ples 10%
L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3
0.90 0.10 1.50 34.33
P METER / M3 163.8447 KG
11.11 180.2292 ples 10%
P METER / M3 126.3381 KG
8.33 138.9719 ples 10%
P METER / M3 239.3680 KG
69.44 263.3048 ples 10%
P METER / M3 147.4250 KG
16.67 162.1675 ples 10%
P METER / M3 206.1126 KG
41.67 226.7238 ples 10%
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.57 88.24
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 137.6986
63.50 27.39 151.4685
P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.57 52.29
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 81.2840
28.78 19.19 89.4124
P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
12 1.57 104.58
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 133.5762
28.78 19.19 146.9339
P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.57 52.29
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 81.2840
28.78 19.19 89.4124
VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10.00 0.025 1.045 53.36
10.00 0.025 1.045 53.36
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.08 12.50
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.67 0.025 1.005 51.32
6.67 0.025 1.005 51.32
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20.00 0.025 1.075 87.83
20.00 0.025 1.075 87.83
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 58.56
13.33 0.025 1.075 58.56
0 0 0 0.00
P METER / M3 82.9486 KG
6.67 91.2435 ples 10%
P METER / M3 128.9832 KG
11.11 141.8816 ples 10%
P METER / M3 100.1920 KG
8.33 110.2112 ples 10%
P METER / M3 229.0140 KG
33.33 251.9154 ples 10%
P METER / M3 280.1170 KG
31.25 308.1287 ples 10%
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 2.23 133.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.115 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 203.3857
58.97 57.82 223.7242
P L T VOLUME M3 / M1
0.3 0.45 1.00 0.14
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 70.22
2 0.88 13.07
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.5 0.80
JUMLAH BEGEL / M3 VOLUME KG / M3 120.8187
68.34 37.52 132.9006
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 152.7493
134.33 47.42 168.0243
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11.5 2.23 170.97
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.105 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 245.9656
64.49 63.23 270.5622
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11 2.23 163.53
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 235.7026
61.61 60.40 259.2729
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 88.88
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 160.3912
114.64 49.46 176.4303
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 217.1818
167.67 59.18 238.9000
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 144.9055
112.11 39.57 159.3961
P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 102.70
2 0.88 17.65
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 163.6039
91.91 43.26 179.9642
P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7.5 1.58 94.80
2 0.88 14.12
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 149.4003
73.73 40.48 164.3403
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5.5 1.58 144.83
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 192.2493
134.33 47.42 211.4743
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7 1.58 138.25
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.07 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 237.7799
179.57 77.47 261.5579
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 131.67
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 190.8484
167.67 59.18 209.9333
P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 1.58 94.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 145.2240
61.61 38.66 159.7464
P L T VOLUME M3 / M1
0.15 0.3 1.00 0.05
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.04 92.44
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 139.2402
149.15 46.80 153.1642
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 205.4160
134.33 47.42 225.9576
P METER / M3 200.2631 KG
55.56 220.2894 ples 10%
P METER / M3 285.0137 KG
8.00 313.5150 ples 10%
VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.045 71.15
13.3333333333 0.025 1.045 45.54
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.05 19.23
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10 0.025 1.005 118.44
4.3333333333 0.025 0.655 33.45
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 99.38
13.3333333333 0.025 1.075 37.48
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.6666666667 0.025 1.075 42.16
6.6666666667 0.025 1.075 42.16
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 84.32
13.3333333333 0.025 1.075 84.32
0 0 0 0.00
8 9 10
20 22
6286 7606
4190 5070
3143 3803
2514 3042
2095 2535
1796 2173
1571 1901
1397 1690
1257 1521
1143 1383
1048 1268
20
12571
8381
6286
5029
4190
3592
3143
2794
2514
2286
2095
g(m)
7 8 9
0.00786
untuk panjang ( m )
7 8 9
1.54 1.76 1.99
2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
7.25 8.29 9.32
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.69
26.81 30.64 34.47
33.63 38.43 43.24
43.93 50.20 56.48
GUGUR
LULUS
0.1307306667
P METER / M3
16.67
P METER / BH
1.00
KG
ples 10%
P METER / M3
31.25
KG
ples 10%
JUMLAH BEGEL / M3 VOLUME KG / M3
95.36 33.10
P METER / M3
16.67
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
VOL KG / M3
20.20
VOL KG / M3
24.40
VOL KG / M3
21.75
VOL KG / M3
69.15
VOL KG / M3
29.77
VOL KG / M3
59.04
P METER / M3
12.50
KG
ples 10%
P METER / M3
5.56
KG
ples 10%
P METER / M3
5.56
KG
ples 10%
P METER / M3
5.56
KG
ples 10%
VOL KG / M3
20.20
11.6085
VOL KG / M3
24.40
12.0230
VOL KG / M3
21.75
VOL KG / M3
52.53
VOL KG / M3
165.22
P METER / M3
6.67
KG
ples 10%
P METER / M3
7.41
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
10.00
KG
ples 10%
P METER / M3
8.00
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
12.50
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
P METER / M3
6.67
KG
ples 10%
P METER / M3
22.22
KG
ples 10%
P METER / M3
16.67
KG
ples 10%
VOL KG / M3
64.09
VOL KG / M3
46.61