DAFTAR STANDAR HARGA SATUAN DASAR (SHSD)

No Nama dan Spesifikasi Satuan Harga ( Rp )

1 2 3 4
I MATERIAL.
1 Air (Biaya air tawar) ltr Rp 130.00
2 Aluminium 4" m2 Rp 65,000.00
3 Batu pecah mesin 1/2 m3 Rp 185,000.00
4 Batu pecah mesin 2/3 m3 Rp 160,000.00
5 Batu Kerikil M3 Rp 110,000.00
6 Batubata Bh Rp 650.00
7 Besi Profil C 100 - 150 mm Kg Rp 12,500.00
8 Besi Profil WF <= 200mm Kg Rp 12,500.00
9 Besi Profil WF <= 200mm s/d 400 mm Kg Rp 13,500.00
10 Besi Plat baja Kg Rp 13,500.00
11 Besi Plat Bordes 4"x8" Tebal 2 mm Kg Rp 13,500.00
12 Besi Plat landas tb 12mm Kg Rp 64,750.00
13 Besi plat strip 3mm x 19 mm x 6 m Kg Rp 14,750.00
14 Besi beton polos Kg Rp 9,750.00
15 Besi Ulir Kg Rp 9,750.00
16 metal furing 2/4 cm m1 Rp 13,500.00
17 Cat Tembok ex vinilex Kg Rp 35,000.00
18 Clear doof kg Rp 43,450.00
19 aquaproofing Kg Rp 50,000.00
20 Closed Jongkok Porselain bh Rp 225,000.00
21 Closed Duduk Porselain bh Rp 850,000.00
22 Coumpond kg Rp 31,400.00
23 Engsel Kuningan ARCH u Pintu Stel Rp 27,100.00
24 Engsel Kuningan ARCH u Jendela Stel Rp 27,100.00
25 Elektroda baja Kg Rp 20,000.00
26 Fitting Plafond Bh Rp 12,000.00
27 Fiber Glass m2 Rp 25,900.00
28 Gedeg Guling m2 Rp 29,500.00
29 Genteng karang Pilang good year Bh Rp 4,500.00
30 Grendel Ekspanyolet bh Rp 53,950.00
31 Kalsiboard t = 4 mm m2 Rp 50,000.00
32 Gypsum t = 9 mm m2 Rp 65,000.00
33 Hak angin sikutan (kuningan) Stel Rp 24,850.00
34 Isolator Bh Rp 5,000.00
35 Wuwung Genteng karang Pilang / Wisma Bh Rp 4,500.00
36 Karet Kusen Alumunium m1 Rp 22,250.00
37 Kawat Bendrat Kg Rp 15,350.00
38 Kayu Gelam Ø 8-12cm p=3m btg Rp 11,500.00
39 Kayu Kamper 1/3 cm m1 Rp 9,000.00
40 Kayu kamper (slimar) m3 Rp 6,750,000.00
41 Kayu Meranti Balok 8/12 m3 Rp 5,500,000.00
42 Kayu Meranti Usuk 4/6 dan 5/7 m3 Rp 5,500,000.00
43 Kayu Meranti ( Bekisting ) m3 Rp 3,100,000.00
44 Kayu meranti papan 4/30/400 m3 Rp 5,500,000.00
45 Kayu Meranti papan 2/20 m3 Rp 5,500,000.00
46 Keramik 30 x 30 putih polos ex. Roman m2 Rp 37,100.00
47 Keramik 30 x 30 wafel ex. Roman m2 Rp 37,100.00
48 Keramik 30 x 30 cm (motif/warna ) ex. Roman m2 Rp 37,100.00
49 Keramik 30 x 30 cm (motif/warna gelap) ex. Roman n2 Rp 37,100.00
50 Keramik dinding 20x25 ex. Roman n2 Rp 37,100.00
51 Keramik 40 x 40 cm (motif/warna gelap) ex. Roman n2 Rp 43,100.00
52 Keramik Tegel Porselain 11x11 ex. Roman m2 Rp 40,000.00
53 Keramik Tegel Porselain 20x20 ex. Roman m2 Rp 44,000.00
54 Keramik plint 7,5x20 cm m1 Rp 5,400.00
55 Kertas gosok No. 150 Lbr Rp 3,500.00
56 Kertas gosok No. 280 Lbr Rp 3,500.00
57 Kran air 1/2" sun'i Bh Rp 52,150.00
58 Kran air Lokal Bh Rp 9,750.00
59 Krepyak Nako bh Rp 8,650.00
60 Kunci tanam besar 2 x putar kuningan Bh Rp 81,250.00
61 Kunci Tanam Wing 808 Bh Rp 48,600.00
62 Kaca Polos t = 5 mm m2 Rp 70,000.00
63 Kaca Polos t = 3 mm m2 Rp 53,950.00
64 Kaca Reyben t = 5 mm m2 Rp 86,350.00
65 Kabel NYA 500 volt 2 x 2,5 Mm2 m Rp 11,500.00
66 Sewa Las Doof bh Rp 1,000.00
67 Lampu SL 23 Watt bh Rp 55,000.00
68 Lem kayu kg Rp 26,500.00
69 Lem PVC bh Rp 12,100.00
70 Listplafond Gypsum m Rp 12,500.00
71 MCB bh Rp 650,000.00
72 Paku skrup Bh Rp 3,000.00
73 Pasir Cor m3 Rp 160,000.00
74 Paku Klem (No.4) kg Rp 12,500.00
75 Pasir Pasang m3 Rp 151,000.00
76 Pasir Urug m3 Rp 115,500.00
77 Paving abu-abu tbl. 8 cm (4 persegi pj ) m2 Rp 52,500.00
78 Paving merah tbl. 8 cm (4 persegi pj ) m2 Rp 58,300.00
79 kanstin k175 m1 Rp 53,500.00
80 Topi uskup merah tebal 8 cm bh Rp 4,500.00
81 Pipa paralon 5/8" m Rp 9,000.00
82 Pewarna sct Rp 900.00
83 Kran Pelampung Set Rp 150,000.00
84 Pipa PVC Ø 1/2" Type AW m Rp 23,250.00
85 Pipa PVC Ø 3/4" Type AW m Rp 28,200.00
86 Pipa PVC Ø 1" Type AW m Rp 34,850.00
87 Pipa PVC Ø 1 1/2" Type AW m Rp 42,300.00
88 Pipa PVC Ø 2 " Type AW m Rp 50,000.00
89 Pipa PVC Ø 3"AW ljr Rp 150,000.00
90 Pipa PVC Ø 4"AW ljr Rp 200,000.00
91 Pipa PVC Ø 5" AW ljr Rp 250,000.00
92 Pipa PVC Ø 1 1/2" C m Rp 24,500.00
93 Pipa PVC Ø 2" C m Rp 38,900.00
94 Pipa PVC Ø 4" C ljr Rp 259,650.00
95 Pipa PVC Ø 3" C ljr Rp 178,150.00
96 Pipa PVC Ø 5" C ljr Rp 409,450.00
97 Pipa PVC Ø 6" C m Rp 152,450.00
98 Plamur Tembok kg Rp 17,500.00
99 Klem PVC Bh Rp 1,650.00
100 Plywood tebal 9mm lbr Rp 95,000.00
101 Saklar Tunggal Bh Rp 15,000.00
102 Saklar Ganda Bh Rp 22,500.00
103 Serat Fiber m2 Rp 6,000.00
104 Shanding kg Rp 43,200.00
105 Rol (Tba) Roll Rp 8,200.00
106 Rangka Galvalum (Terpasang) m2 Rp 145,000.00
107 Railling pipa stenlist steel ∅ 2,5" m2 Rp 600,000.00
108 Semen Pc 40 kg Zak Rp 52,000.00
109 Semen Pc 50 kg Zak Rp 65,000.00
110 Semen Warna kg Rp 9,000.00
111 Seng BJLS 40 L=60cm m2 Rp 30,250.00
112 Sirtu m3 Rp 143,800.00
113 Slimar Alumunium m1 Rp 28,000.00
114 Solar ltr Rp 11,000.00
115 minyak pelumas ltr Rp 24,000.00
116 Stop Kontak Broco Bh Rp 17,500.00
117 Stopper uskup tbl. 6 cm Bh Rp 6,000.00
118 T doos PVC Bh Rp 2,200.00
119 Teakwood t= 4mm Lbr Rp 45,900.00
120 Tanah Urug m3 Rp 90,000.00
121 Thinner A ltr Rp 25,000.00
122 Woodplank + pemasangan m1 Rp 27,000.00
123 Besi Hollow 4/4 m1 Rp 23,000.00
124 Besi Hollow 2/4 m1 Rp 20,000.00
125 Thinner A Kg Rp 14,000.00
126 Woodplank + pemasangan bh Rp 7,500.00
127 besi Baja Siku L Kg Rp 12,000.00
128 Mur baut Ø 16 mm bh Rp 2,000.00
129 Reng galvalum m1 Rp 16,500.00
130 Usuk galvalum t = 0,8 mm m1 Rp 27,000.00
131 Cat kayu / besi Kg Rp 45,000.00
132 Cat tembok Kg Rp 35,000.00
133 Cat kayu penutup Kg Rp 37,500.00
134 Cat Meni Besi Kg Rp 20,000.00
135 Cat Meni Kayu Kg Rp 20,000.00
136 Plamir kayu Kg Rp 20,000.00
137 Pintu HDF Singgle With Glass Door Bh Rp 675,000.00
138 Pintu HDF Doble with Glass Door Bh Rp 1,330,000.00
139 Kusen Nyatoh Kiln Dried Pintu Doble Bh Rp 800,000.00
140 Kusen Nyatoh Kiln Dried Pintu Single Bh Rp 400,000.00
141 Pintu Kamar mandi WPC Set Rp 830,000.00
142 Pipa PVC 5" typeAW pj. 4 mtr Lonjor Rp 409,450.00
143 Klem PVC Buah Rp 1,650.00
144 Batu Kali Pecah 15/20 M3 Rp 140,000.00
145 Prebal M1 Rp 1,000.00
146 casting Kg Rp 3,000.00
147 Paku Reng Dooz Rp 65,000.00
148 Engsel kuningan pintu Set Rp 20,400.00
149 Engsel kuningan jendela Set Rp 20,400.00
150 Grendel Jendela Bh Rp 9,000.00
151 Kaca Bening t = 10 mm m2 Rp 270,000.00
152 Jarum Keras / Track Stang Bh Rp 7,500.00
153 Genteng Beton Bh Rp 7,500.00
154 Wuwung Genteng beton Bh Rp 21,000.00
155 Cat Genteng Dulux Weathershield Roof Paint 2,5 Kg Kg Rp 65,000.00
156 Avour Bh Rp 21,000.00
157 Sirtu Lokal/songsong m3 Rp 82,500.00
158 Granit m2 Rp 250,000.00
159 Hollow 50 x 50 Lonjor Rp 193,000.00
160 Hollow 30 x 30 Lonjor Rp 89,000.00
161 Hollow 40 x 60 Lonjor Rp 163,000.00
162 Hollow 40x40 Lonjor Rp 91,000.00
163 Hollow 100x50 Lonjor Rp 225,000.00
164 pollycarbonate easy clean m2 Rp 104,000.00
165 Pintu allumunium dengan teralis bh Rp 1,000,000.00
166 Pintu allumunium bh Rp 1,500,000.00
167 Pipa welded hitam 4" Lonjor Rp 215,000.00
168 Wuwung Genteng karang Pilang / Wisma m1 Rp 20,000.00

1 Mandor hr Rp 65,000.00
2 Surveyor Geodesi hr Rp 100,000.00
2 Kepala Tukang Batu hr Rp 62,500.00
3 Kepala Tukang Besi hr Rp 62,500.00
4 Kepala Tukang Cat hr Rp 62,500.00
5 Kepala Tukang Kayu hr Rp 62,500.00
6 Kepala Tukang Listrik hr Rp 62,500.00
7 Kepala Tukang Pipa hr Rp 62,500.00
8 Tukang Batu hr Rp 60,000.00
9 Tukang Besi hr Rp 60,000.00
10 Tukang Cat hr Rp 60,000.00
11 Tukang Kayu hr Rp 60,000.00
12 Tukang Las hr Rp 60,000.00
13 Tukang Listrik hr Rp 60,000.00
14 Tukang Pipa hr Rp 60,000.00
15 Pekerja Terampil hr Rp 59,000.00
16 Pekerja / Buruh Tak Terampil hr Rp 57,206.00
17 Petugas Survey hr Rp 57,206.00

III. PERALATAN
1 Sewa Compresor Jam Rp 35,000.00
2 Sewa alat bantu bor pile set Rp 75,000.00
3 Sewa Alat Bantu ( 1 set @ 3 alat ) jam Rp 1,000.00
4 Sewa Alat Bantu (1 Set @ 3 Alat) jam Rp 1,000.00
ANALISA HARGA SATUAN 2013

Jenis Pekerjaan : Urugan Pasir Untuk Paving


Satuan Pembayaran : M3 Kode : 24.01.02.23
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5

1 Mandor Hr 0.01 65,000.00


2 Pekerja Terampil Hr 0.30 59,000.00
3 Pasir Urug M3 1.20 115,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan : Urugan Sirtu Untuk Paving


Satuan Pembayaran : M3 Kode : 24.01.02.24
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5

1 Mandor Hr 0.025 65,000.00


2 Pekerja Tak Terampil Hr 0.400 57,206.00
3 Tasirtu / Sirtu M3 1.200 143,800.00

HARGA SATUAN PEKERJAAN


DIBULATKAN
Jenis Pekerjaan : Permasangan Paving Stone Blok tb. 8 cm
Satuan Pembayaran : M2 Kode : 24.08.01.04
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5

1 Mandor Hr 0.0250 65,000.00


2 Kepala Tukang Batu Hr 0.0250 62,500.00
3 Tukang Batu Hr 0.0500 60,000.00
4 Pekerja / Buruh Tak Terampil Hr 0.0500 57,206.00
5 Paving Stone Abu-abu tb. 8 cm ( 4 persegi pj. ) M2 1.000 52,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan : Permasangan Paving Stone Blok tb. 8 cm Full Warna Merah
Satuan Pembayaran : M2 Kode : 25.08.01.
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5
file name:420564484.xlsx 5
1 Mandor Hr 0.0250 65,000.00
2 Kepala Tukang Batu Hr 0.0250 62,500.00
3 Tukang Batu Hr 0.0500 60,000.00
4 Pekerja / Buruh Tak Terampil Hr 0.0500 57,206.00
5 Paving Stone Full Warna Merah tb. 8 cm ( 4 perse M2 1.000 58,300.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan : Pas. Stopper / Topi Uskup Tb. 8 cm


Satuan Pembayaran : M1 Kode : 24.08.01.28
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN
( Rp. )
1 2 3 4 5

1 Mandor Hr 0.0010 65,000.00


2 Kepala Tukang Batu Hr 0.0100 62,500.00
3 Tukang Batu Hr 0.1000 60,000.00
4 Pekerja Terampil Hr 0.2000 59,000.00
5 Pasir Pasang M3 0.0010 151,000.00
6 Stopper / Topi Uskup tb. 8 cm Bh 3.340 4,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

Jenis Pekerjaan : Pas. Kanstin Trap uk. 15.25.40 K-175


Satuan Pembayaran : M1 Kode : 24.08.01.26
HARGA SATUAN
No. URAIAN KEGIATAN SAT. KOEFFISIEN ( Rp. )
1 2 3 4 5

1 Mandor Hr 0.001 65,000.00


2 Kepala Tukang Batu Hr 0.025 62,500.00
3 Tukang Batu Hr 0.050 60,000.00
4 Pekerja Terampil Hr 0.050 59,000.00
5 Pasir Pasang M3 0.0054 151,000.00
6 Semen / PC ( 50 Kg ) Sak 0.0568 65,000.00
7 Kanstin Trap uk. 15.25.40 M1 1.100 53,500.00

HARGA SATUAN PEKERJAAN


DIBULATKAN

file name:420564484.xlsx 6
JUMLAH
( Rp. )
6=4×5

650.00
17,700.00
138,600.00

156,950.00
156,950.00

JUMLAH
( Rp. )
6=4×5

1,625.00
22,882.40
172,560.00

197,067.40
197,065.00

JUMLAH
( Rp. )
6=4×5

1,625.00
1,562.50
3,000.00
2,860.30
52,500.00

61,547.80
61,545.00

JUMLAH
( Rp. )
6=4×5
file name:420564484.xlsx 7
1,625.00
1,562.50
3,000.00
2,860.30
58,300.00

67,347.80
67,345.00

JUMLAH
( Rp. )
6=4×5

65.00
625.00
6,000.00
11,800.00
151.00
15,030.00

33,671.00
33,670.00

JUMLAH
( Rp. )
6=4×5

65.00
1,562.50
3,000.00
2,950.00
815.40
3,692.00
58,850.00

70,934.90
70,930.00

file name:420564484.xlsx 8
ANALISA HARGA SATUAN BAHAN DAN UPAH
HARGA SATUAN HARGA
NO. URAIAN KEGIATAN KOEFISIEN SATUAN
(Rp.) (Rp.)
1 Pembuatan Bouwplank (Uietzet) (m1)
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang Kayu 0.0100 O.H 62,500.00 625.00
Tukang kayu 0.1000 O.H 60,000.00 6,000.00
Pekerja / buruh tak terampil 0.1000 650 57,206.00 5,720.60
Bahan/material Jumlah 12,670.60
Kayu meranti (papan 2/20)) 0.0042 m3 5,500,000.00 23,100.00
Besi plat strip 0.0039 18900 14,750.00 57.53
Kayu meranti (usuk 4/6) 0.0039 m3 5,500,000.00 21,450.00
Paku 0.0200 kg 12,500.00 250.00
Jumlah 44,857.53
NILAI HSPK 57,528.13
2 Pembersihan Lapangan Ringan (m2)
Upah
Mandor 0.0025 O.H 65,000.00 162.50
pekerja tak terampil 0.0500 O.H 57,206.00 2,860.30
Jumlah 3,022.80
NILAI HSPK 3,022.80
3 Pembongkaran Penutup Atap dan rangka tidak dipakai kembali (m2)
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Pekerja tak terampil 0.1000 O.H 57,206.00 5,720.60
Jumlah 6,045.60
NILAI HSPK 6,045.60
4 Penggalian Tanah Untuk Konstruksi ( m3 )
Upah
Mandor 0.0250 O.H 65,000.00 1,625.00
Pekerja tak terampil 0.7500 O.H 57,206.00 42,904.50
Jumlah 44,529.50
NILAI HSPK 44,529.50

5 Pengurungan Tanah Kembali untuk gedung ( m3 )


Upah
Mandor 0.0083 O.H 65,000.00 539.50
Pekerja tak terampil 0.2500 O.H 57,206.00 14,301.50
Jumlah 14,841.00
NILAI HSPK 14,841.00
6 Pengurungan pasir padat (m3)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Pekerja terampil 0.3000 O.H 59,000.00 17,700.00
Jumlah 18,350.00
Bahan
Pasir Urug 1.2000 m3 115,500.00 138,600.00
Jumlah 138,600.00
Sewa Peralatan
Sewa Alat Bantu ( 1 set @ 3 alat ) 0.0213 jam 1,000.00 21.30
Jumlah 21.30
40000 NILAI HSPK 156,971.30
26. Tanah Urug Katel (m3)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Pekerja terampil 0.3000 O.H 59,000.00 17,700.00
Jumlah 18,350.00
Sewa Alat Bantu ( 1 set @ 3 alat ) 0.0213 jam 1,000.00 21.30
Jumlah 21.30
Bahan
Sirtu Lokal/songsong 1.2000 m3 82,500.00 99,000.00
Jumlah 99,000.00
NILAI HSPK 117,371.30
7 Pemasangan Batu Kali Belah 15/20 cm ( 1Pc:4Ps ) (m3)
Upah
Mandor 0.0750 O.H 65,000.00 4,875.00
Kepala Tukang Batu 0.0750 O.H 62,500.00 4,687.50
Tukang batu 0.7500 O.H 60,000.00 45,000.00
Pekerja/buruh tak terampil 1.5000 O.H 57,206.00 85,809.00
Jumlah 140,371.50
Bahan
Semen PC ( Portland Cement ) 50 kg 3.2600 zak 65,000.00 211,900.00
Pasir Pasang 0.5200 m3 151,000.00 78,520.00
Batu Kali Pecah 15/20 cm 1.2000 m3 140,000.00 168,000.00
Jumlah 458,420.00
NILAI HSPK 598,791.50
8 Pemasangan Batu Kali Belah Kosongan tebal 20 cm ( m3 )
Upah
Mandor 0.0170 O.H 65,000.00 1,105.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang batu 0.1500 O.H 60,000.00 9,000.00
Pekerja tak terampil 0.3500 O.H 57,206.00 20,022.10
Jumlah 31,064.60
Bahan
Batu Kali pecah 15/20 cm 1.2000 m3 140,000.00 168,000.00
Jumlah 168,000.00
NILAI HSPK 199,064.60

9 Acuan untuk Beton Struktur ( Bekisting ) (m3)


Upah
Mandor 0.0600 O.H 65,000.00 3,900.00
Kepala Tukang Kayu 0.3300 O.H 62,500.00 20,625.00
Tukang Kayu 3.3000 O.H 60,000.00 198,000.00
Pekerja Tak Terampil 3.0000 O.H 57,206.00 171,618.00
Jumlah 394,143.00
Bahan
Kayu meranti bekisting 0.0400 m3 3,100,000.00 124,000.00
Paku 0.4000 kg 12,500.00 5,000.00
Solar 0.2000 ltr 11,000.00 2,200.00
Kayu meranti 4/6 0.0150 m3 5,500,000.00 82,500.00
Plywood tebal 9mm 0.3500 lbr 95,000.00 33,250.00
Dolken kayu gelam dia 8-10 cm, panjang 4m 2.0000 btg 11,500.00 23,000.00
Jumlah 269,950.00
NILAI HSPK 664,093.00
10 Pekerjaan Bekisting kolom / Balok/Plat (m3)
Acuan untuk beton struktur ( bekisting ) 4.0000 m2 664,093.00 2,656,372.00
Jumlah 2,656,372.00
NILAI HSPK 2,656,372.00
11 Pekerjaan Bekisting Kolom Praktis (m3)
Acuan Untuk Beton Struktur ( Bekisting ) 0.6000 m3 664,093.00 398,455.80
Jumlah 398,455.80
NILAI HSPK 398,455.80
12 Pekerjaan pembesian (kg)
Upah
Mandor 0.0004 O.H 65,000.00 26.00
Kepala Tukang Besi 0.0007 O.H 62,500.00 43.75
Pekerja Terampil 0.0070 O.H 59,000.00 413.00
Pekerja Tak Terampil 0.0070 O.H 57,206.00 400.44
Jumlah 883.19
Bahan
Besi Beton Polos 1.0500 kg 9,750.00 10,237.50
Kawat ikat beton ( bendrat) 0.0150 kg 15,350.00 230.25
Jumlah 10,467.75
NILAI HSPK 11,350.94
13 Pekerjaan pembesian dengan besi ulir (kg)
Upah
Mandor 0.0004 O.H 65,000.00 26.00
Kepala Tukang Besi 0.0007 O.H 62,500.00 43.75
Pekerja Terampil 0.0070 O.H 59,000.00 413.00
Pekerja Tak Terampil 0.0070 O.H 57,206.00 400.44
Jumlah 883.19
Bahan
Besi Ulir 1.0500 kg 9,750.00 10,237.50
Kawat ikat beton ( bendrat) 0.0150 kg 15,350.00 230.25
Jumlah 10,467.75
NILAI HSPK 11,350.94
14 Pembongkaran Cetakan dan penyiraman beton ( m3)
Upah
pekerja / buruh tak terampil 2.7777 O.H 57,206.00 158,901.11
Jumlah 158,901.11
NILAI HSPK 158,901.11
15 Pekerjaan Beton berstruktur K-225 (1Pc:2Ps:3Kr) ( m3)
Upah
Mandor 0.0830 O.H 65,000.00 5,395.00
Kepala Tukang Batu 0.0280 O.H 62,500.00 1,750.00
Tukang Batu 0.2750 O.H 60,000.00 16,500.00
Pekerja / buruh tak terampil 1.6500 O.H 57,206.00 94,389.90
Jumlah 118,034.90
Bahan
Pasir cor / Beton 0.4986 m3 160,000.00 79,776.00
Semen PC ( Portland Cement ) 40 Kg 7.4200 zak 52,000.00 385,840.00
Batu pecah mesin 1/2 cm 0.7756 m3 185,000.00 143,486.00
Air (biaya air tawar) 215.0000 ltr 130.00 27,950.00
Jumlah 637,052.00
NILAI HSPK 755,086.90
16 Pekerjaan Beton berstruktur K-350 (1Pc:1,5Ps:2,5Kr) ( m3)
Upah
Mandor 0.1050 O.H 65,000.00 6,825.00
Kepala Tukang Batu 0.0350 O.H 62,500.00 2,187.50
Tukang Batu 0.3500 O.H 60,000.00 21,000.00
Pekerja / buruh tak terampil 2.1000 O.H 57,206.00 120,132.60
Jumlah 150,145.10
Bahan
Pasir cor / Beton 0.4764 m3 160,000.00 76,224.00
Semen PC ( Portland Cement ) 8.9600 zak 52,000.00 465,920.00
Batu pecah mesin 1/2 cm 0.7407 m3 185,000.00 137,029.50
Air (biaya air tawar) 215.0000 ltr 130.00 27,950.00
Jumlah 707,123.50
NILAI HSPK 857,268.60
16 Beton kolom praktis 12x12 cm Bertulang 1Pc:2Ps:3Kr ( K-225 )
Upah
Pekerjaan Beton Berstrutur K-225 1.0000 m3 755,086.90 755,086.90
Pekerjaan Pembesian 147.8367 kg 11,350.94 1,678,086.03
Acuan Untuk Beton Struktur ( Bekisting ) 0.2500 m3 2,656,372.00 664,093.00
Pembongkaran Cetakan Penyiraman Beton 1.0000 m3 158,901.11 158,901.11
Jumlah 3,256,167.04
NILAI HSPK 3,256,167.04

17 Beton kolom 1 Bertulang 1Pc:2Ps:3Kr ( K-225 )


Upah
Pekerjaan Beton Berstrutur K-225 1.0000 m3 755,086.90 755,086.90
Pekerjaan Pembesian 402.2210 kg 11,350.94 4,565,586.79
Acuan Untuk Beton Struktur ( Bekisting ) 0.5000 m3 2,656,372.00 1,328,186.00
Pembongkaran Cetakan Penyiraman Beton 1.0000 m3 158,901.11 158,901.11
Jumlah 6,807,760.79
NILAI HSPK 6,807,760.79
18 Beton sloof 1 Bertulang 1Pc:2Ps:3Kr ( K-225 )
Upah
Pekerjaan Beton Berstrutur K-225 1.0000 m3 755,086.90 755,086.90
Pekerjaan Pembesian 386.4020 kg 11,350.94 4,386,026.30
Acuan Untuk Beton Struktur ( Bekisting ) 0.5000 m3 2,656,372.00 1,328,186.00
Pembongkaran Cetakan Penyiraman Beton 1.0000 m3 158,901.11 158,901.11
Jumlah 6,628,200.31
NILAI HSPK 6,628,200.31
23 Beton balok LATEI 12/20 Bertulang 1Pc:2Ps:3Kr ( K-225 )
Upah
Pekerjaan Beton Berstrutur K-225 1.0000 m3 755,086.90 755,086.90
Pekerjaan Pembesian 206.1126 kg 11,350.94 2,339,571.98
Acuan Untuk Beton Struktur ( Bekisting ) 0.5000 m3 2,656,372.00 1,328,186.00
Pembongkaran Cetakan Penyiraman Beton 1.0000 m3 158,901.11 158,901.11
Jumlah 4,581,745.99
NILAI HSPK 4,581,745.99
40 Pembongkaran Beton (m2)
Upah
Mandor 0.1250 O.H 65,000.00 8,125.00
Pekerja Terampil 1.5000 O.H 59,000.00 88,500.00
Jumlah 96,625.00
Sewa Peralatan
Sewa Alat bantu ( 1 set @ 3 alat ) 1.0000 jam 1,000.00 1,000.00
Jumlah 1,000.00
NILAI HSPK 97,625.00
19 Pekerjaan Beton Rabat ( 1Pc:3Ps:6Kr) (m3)
Upah
Mandor 0.0800 O.H 65,000.00 5,200.00
Kepala Tukang batu 0.0250 O.H 62,500.00 1,562.50
Tukang Batu 0.2500 O.H 60,000.00 15,000.00
Pekerja Terampil 1.6500 O.H 59,000.00 97,350.00
Jumlah 119,112.50
Bahan
Semen PC ( Portland Cement ) 50 kg 3.7257 zak 65,000.00 242,170.50
Pasir Cor 0.5081 m3 160,000.00 81,296.00
Batu Pecah 2/3 cm 1.0161 m3 160,000.00 162,576.00
Jumlah 486,042.50
NILAI HSPK 605,155.00
20 Pekerjaan Besi Plat baja
Bahan
Besi Plat baja 1.1000 kg 13,500.00 14,850.00
Jumlah 14,850.00
NILAI HSPK 14,850.00
21 Pekerjaan Besi Track Stang
Bahan
Besi TrackStang Ø 10 mm 1.1000 kg 9,750.00 10,725.00
Jumlah 10,725.00
NILAI HSPK 10,725.00
22 Pekerjaan Besi Baja Profil WF 150.100.6.9 ( kg )
Bahan
Besi Profil WF ≤ 200 mm s/d 400 mm 1.1000 kg 13,500.00 14,850.00
Jumlah 14,850.00
NILAI HSPK 14,850.00
23 Pekerjaan Besi Baja C 150 x 65 x 20 X 3,2 ( kg )
Bahan
Besi Profil C 100 mm s/d 150 mm 1.1000 kg 12,500.00 13,750.00
Jumlah 13,750.00
NILAI HSPK 13,750.00
24 1 kg pengelasan dengan las listrik
Upah
Pekerja Terampil 0.0040 hr 59,000.00 236.00
Tukang Besi 0.0040 hr 60,000.00 240.00
Kepala Tukang Besi 0.0020 hr 62,500.00 125.00
Mandor 0.0020 hr 65,000.00 130.00
Bahan
elektroda 0.0020 hr 20,000.00 40.00
solar 0.0400 ltr 11,000.00 440.00
Minyak Pelumas 0.0040 ltr 24,000.00 96.00
NILAI HSPK 1,307.00
25 1 kg Pekerjaan Perakitan Besi
Upah
Mandor 0.0001 O.H 65,000.00 3.25
Kepala Tukang Besi 0.0000 O.H 62,500.00 0.63
Tukang Besi 0.0010 O.H 60,000.00 60.00
Pekerja Terampil 0.0010 O.H 59,000.00 59.00
Bahan
Solar 0.0100 liter 11,000.00 110.00
Minyak Pelumas 0.0010 liter 24,000.00 24.00
Sewa Alat Bantu (1 Set @ 3 Alat) 0.0080 jam 1,000.00 8.00
NILAI HSPK 264.88

26 Pemasangan Batu Merah 1Pc:4Ps tinggi 2m - 5 m (m2)


Upah
Mandor 0.0236 O.H 65,000.00 1,534.00
kepala Tukang Batu 0.0158 O.H 62,500.00 987.50
Tukang Batu 0.1575 O.H 60,000.00 9,450.00
pekerja tak terampil 0.4725 O.H 57,206.00 27,029.84
Jumlah 39,001.34
Bahan
Semen PC (Portland cement ) 50 kg 0.2337 zak 65,000.00 15,190.50
Pasir Pasang 0.0425 m3 151,000.00 6,417.50
Batu Bata merah uk. 23x10,5x5,5 cm 52.0000 buah 650.00 33,800.00
Jumlah 55,408.00
NILAI HSPK 94,409.34
106. Pemasangan Batu Merah 1Pc:5Ps tinggi s/d 2m (m3)
Upah
Mandor 0.1600 O.H 65,000.00 10,400.00
kepala Tukang Batu 0.1200 O.H 62,500.00 7,500.00
Tukang Batu 1.2000 O.H 60,000.00 72,000.00
pekerja .buruh tak terampil 3.6000 O.H 57,206.00 205,941.60
Jumlah 295,841.60
Bahan
Semen PC (Portland cement ) 50 kg 1.8622 zak 49,500.00 92,178.90
Pasir Pasang 0.4515 m3 130,000.00 58,695.00
Batu Bata merah uk. 23x10,5x5,5 cm 490.0000 buah 550.00 269,500.00
Jumlah 420,373.90
NILAI HSPK 716,215.50
107. Pemasangan Batu Merah 1Pc:5Ps tinggi s/d 2m (m2)
Upah
Mandor 0.0168 O.H 65,000.00 1,092.00
kepala Tukang Batu 0.0126 O.H 62,500.00 787.50
Tukang Batu 0.1260 O.H 60,000.00 7,560.00
pekerja .buruh tak terampil 0.3780 O.H 57,206.00 21,623.87
Jumlah 31,063.37
Bahan
Semen PC (Portland cement ) 50 kg 0.1955 zak 49,500.00 9,677.25
Pasir Pasang 0.0474 m3 130,000.00 6,162.00
Batu Bata merah uk. 23x10,5x5,5 cm 52.0000 buah 550.00 28,600.00
Jumlah 44,439.25
NILAI HSPK 75,502.62
108. Pemasangan Batu Merah 1Pc:4Ps tinggi 2m-5m (m3)
Upah
Mandor 0.2250 O.H 65,000.00 14,625.00
kepala Tukang Batu 0.1500 O.H 62,500.00 9,375.00
Tukang Batu 1.5000 O.H 60,000.00 90,000.00
pekerja .buruh tak terampil 4.5000 O.H 57,206.00 257,427.00
Jumlah 371,427.00
Bahan
Semen PC (Portland cement ) 50 kg 1.8622 zak 49,500.00 92,178.90
Pasir Pasang 0.4515 m3 130,000.00 58,695.00
Batu Bata merah uk. 23x10,5x5,5 cm 490.0000 buah 550.00 269,500.00
Jumlah 420,373.90
NILAI HSPK 791,800.90
109. Pemasangan Glasblock 20x20 (m2)
Upah
Mandor 0.0236 O.H 65,000.00 1,534.00
kepala Tukang Batu 0.0158 O.H 62,500.00 987.50
Tukang Batu 0.1575 O.H 60,000.00 9,450.00
pekerja .buruh tak terampil 0.4725 O.H 57,206.00 27,029.84
Jumlah 39,001.34
Bahan
Semen PC (Portland cement ) 50 kg 0.1500 zak 49,500.00 7,425.00
Pasir Pasang 0.0474 m3 130,000.00 6,162.00
Glasblock 25.0000 buah 12,000.00 300,000.00
Jumlah 313,587.00
NILAI HSPK 352,588.34
110. Pemasangan Batu Merah 1Pc:3Kp:8Ps tinggi s/d 2m (m3)
Upah
Mandor 0.2250 O.H 65,000.00 14,625.00
kepala Tukang Batu 0.1500 O.H 62,500.00 9,375.00
Tukang Batu 1.5000 O.H 60,000.00 90,000.00
pekerja .buruh tak terampil 4.5000 O.H 57,206.00 257,427.00
Jumlah 371,427.00
Bahan
Semen PC (Portland cement ) 50 kg 0.7972 zak 49,500.00 39,461.40
Kapur Pasang 0.1360 m3 Err:509 Err:509
Pasir Pasang 0.3627 m3 130,000.00 47,151.00
Batu Bata merah uk. 23x10,5x5,5 cm 490.0000 buah 550.00 269,500.00
Jumlah Err:509
NILAI HSPK Err:509
111. Pemasangan Batu Merah 1Pc:3Kp:8Ps tinggi s/d 2m (m2)
Upah
Mandor 0.0236 O.H 65,000.00 1,534.00
kepala Tukang Batu 0.0158 O.H 62,500.00 987.50
Tukang Batu 0.1575 O.H 60,000.00 9,450.00
pekerja .buruh tak terampil 0.4725 O.H 57,206.00 27,029.84
Jumlah 39,001.34
Bahan
Semen PC (Portland cement ) 50 kg 0.7972 zak 49,500.00 39,461.40
Kapur Pasang 0.0143 m3 Err:509 Err:509
Pasir Pasang 0.0381 m3 130,000.00 4,953.00
Batu Bata merah uk. 23x10,5x5,5 cm 52.0000 buah 550.00 28,600.00
Jumlah Err:509
NILAI HSPK Err:509
112. Pemasangan Batu Merah 1Pc:3Kp:8Ps tinggi 2m-5m (m3)
Upah
Mandor 0.2250 O.H 65,000.00 14,625.00
kepala Tukang Batu 0.1500 O.H 62,500.00 9,375.00
Tukang Batu 1.5000 O.H 60,000.00 90,000.00
pekerja .buruh tak terampil 4.5000 O.H 57,206.00 257,427.00
Jumlah 371,427.00
Bahan
Semen PC (Portland cement ) 50 kg 0.9974 zak 49,500.00 49,371.30
Kapur Pasang 0.1360 m3 Err:509 Err:509
Pasir Pasang 0.3627 m3 130,000.00 47,151.00
Batu Bata merah uk. 23x10,5x5,5 cm 490.0000 buah 550.00 269,500.00
Jumlah Err:509
NILAI HSPK Err:509
113. Pemasangan Batu Merah 1Pc:3Kp:8Ps tinggi 2m-5m (m2)
Upah
Mandor 0.0236 O.H 65,000.00 1,534.00
kepala Tukang Batu 0.0158 O.H 62,500.00 987.50
Tukang Batu 0.1575 O.H 60,000.00 9,450.00
pekerja .buruh tak terampil 0.4725 O.H 57,206.00 27,029.84
Jumlah 39,001.34
Bahan
Semen PC (Portland cement ) 50 kg 0.1047 zak 49,500.00 5,182.65
Kapur Pasang 0.0143 m3 Err:509 Err:509
Pasir Pasang 0.0381 m3 130,000.00 4,953.00
Batu Bata merah uk. 23x10,5x5,5 cm 52.0000 buah 550.00 28,600.00
Jumlah Err:509
NILAI HSPK Err:509
27 Pemasangan batu Merah Kosongan (m3)
Upah
Mandor 0.0495 O.H 65,000.00 3,217.50
kepala Tukang Batu 0.0330 O.H 62,500.00 2,062.50
Tukang Batu 0.3300 O.H 60,000.00 19,800.00
pekerja .buruh tak terampil 0.9900 O.H 57,206.00 56,633.94
Jumlah 81,713.94
Bahan
Batu Bata Merah 23x10,5x5,5 cm 499.0000 buah 550.00 274,450.00
Jumlah 274,450.00
NILAI HSPK 356,163.94
28 Pembongkaran Dinding tembok dengan pembersihan (m3)
Upah
Mandor 0.0500 O.H 65,000.00 3,250.00
Pekerja / buruh tak terampil 1.0000 O.H 57,206.00 57,206.00
Jumlah 60,456.00
NILAI HSPK 60,456.00
116. Pekerjaan Plesteran 1Pc:1/4Kp:2Ps tebal 1 cm (m2)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Terampil 0.2000 O.H 59,000.00 11,800.00
Jumlah 22,387.50
Bahan
Semen PC (Portland Cement ) 50 kg 0.1179 zak 49,500.00 5,836.05
Kapur Gamping 0.0013 m3 Err:509 Err:509
Pasir pasang 0.0107 m3 130,000.00 1,391.00
Jumlah Err:509
NILAI HSPK Err:509
117. Pekerjaan Plesteran 1Pc:1Kp:2Ps tebal 1 cm (m2)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Terampil 0.2000 O.H 59,000.00 11,800.00
Jumlah 22,387.50
Bahan
Semen PC (Portland Cement ) 50 kg 0.1004 zak 49,500.00 4,969.80
Kapur Gamping 0.0046 m3 Err:509 Err:509
Pasir pasang 0.0091 m3 130,000.00 1,183.00
Jumlah Err:509
NILAI HSPK Err:509
118. Plesteran Halus 1Pc:2Ps tebal 1 cm (m2)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.2000 O.H 57,206.00 11,441.20
Jumlah 22,028.70
Bahan
Semen PC (Portland Cement ) 50 kg 0.1251 zak 49,500.00 6,192.45
Pasir pasang 0.0119 m3 130,000.00 1,547.00
Jumlah 7,739.45
NILAI HSPK 29,768.15
29 Plesteran Halus 1Pc:2Ps tebal 1,5 cm (m2)
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.3000 O.H 57,206.00 17,161.80
Jumlah 28,074.30
Bahan
Semen PC (Portland Cement ) 50 kg 0.1700 zak 49,500.00 8,415.00
Pasir pasang 0.0171 m3 130,000.00 2,223.00
Jumlah 10,638.00
NILAI HSPK 38,712.30
120. Plesteran Halus 1Pc:3Ps tebal 1cm (m2)
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.3000 O.H 57,206.00 17,161.80
Jumlah 28,074.30
Bahan
Semen PC (Portland Cement ) 50 kg 0.1080 zak 49,500.00 5,346.00
Pasir pasang 0.0130 m3 130,000.00 1,690.00
Jumlah 7,036.00
NILAI HSPK 35,110.30
121. Plesteran Halus 1Pc:3Ps tebal 1,5 cm (m2)
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.3000 O.H 57,206.00 17,161.80
Jumlah 28,074.30
Bahan
Semen PC (Portland Cement ) 50 kg 0.1364 zak 49,500.00 6,751.80
Pasir pasang 0.0200 m3 130,000.00 2,600.00
Jumlah 9,351.80
NILAI HSPK 37,426.10
122. Plesteran Halus 1Pc:4Ps tebal 1cm (m2)
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.2000 O.H 57,206.00 11,441.20
Jumlah 22,028.70
Bahan
Semen PC (Portland Cement ) 50 kg 0.0763 zak 49,500.00 3,776.85
Pasir pasang 0.0139 m3 130,000.00 1,807.00
Jumlah 5,583.85
NILAI HSPK 27,612.55
27 Plesteran Halus 1Pc:4Ps tebal 1,5 cm (m2)
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Batu 0.0150 O.H 62,500.00 937.50
Tukang Batu 0.1500 O.H 60,000.00 9,000.00
Pekerja Tak Terampil 0.3000 O.H 57,206.00 17,161.80
Jumlah 28,074.30
Bahan
Semen PC (Portland Cement ) 50 kg 0.1030 zak 65,000.00 6,695.00
Pasir pasang 0.0215 m3 151,000.00 3,246.50
Jumlah 9,941.50
NILAI HSPK 38,015.80
28 acian
Upah
Mandor 0.0100 O.H 65,000.00 650.00
Kepala Tukang Batu 0.0100 O.H 62,500.00 625.00
Tukang Batu 0.1000 O.H 60,000.00 6,000.00
Pekerja Tak Terampil 0.2000 O.H 57,206.00 11,441.20
Jumlah 18,716.20
Bahan
Semen PC (Portland Cement ) 50 kg 0.0650 zak 65,000.00 4,225.00
Jumlah 4,225.00
NILAI HSPK 22,941.20
28 Pasang Benangan (m1)
Upah
Tukang Batu 0.1200 O.H 60,000.00 7,200.00
Jumlah 7,200.00
Bahan
Semen PC ( Portland Cement ) 50 Kg 0.0100 zak 65,000.00 650.00
Pasir Pasang 0.0130 m3 151,000.00 1,963.00
Jumlah 2,613.00
NILAI HSPK 9,813.00
29 Pengecatan / plamur tembok dengan cat tembok ( m2 )
Upah
Mandor 0.0025 O.H 65,000.00 162.50
Kepala Tukang cat 0.0075 O.H 62,500.00 468.75
Tukang cat 0.0750 O.H 60,000.00 4,500.00
Pekerja / buruh tak terampil 0.0500 O.H 57,206.00 2,860.30
Jumlah 7,991.55
Bahan
Cat tembok 0.3000 kg 35,000.00 10,500.00
Plamur tembok 0.1200 kg 17,500.00 2,100.00
Kertas gosok no. 150 0.1000 lembar 3,500.00 350.00
Jumlah 12,950.00
NILAI HSPK 20,941.55
31 Pemasangan Tegel Keramik 30x30 cm ( motif / warna ) (m2)
Upah
Mandor 0.0350 O.H 65,000.00 2,275.00
Kepala Tukang batu 0.0350 O.H 62,500.00 2,187.50
Tukang Batu 0.3500 O.H 60,000.00 21,000.00
Pekerja / buruh tak termpil 0.7000 O.H 57,206.00 40,044.20
Jumlah 65,506.70
Bahan
Semen PC (Portland Cement ) 50 kg 0.2000 zak 65,000.00 13,000.00
Semen berwarna Yiyitan 1.5000 kg 9,000.00 13,500.00
Pasir Pasang 0.0450 m3 151,000.00 6,795.00
Tegel Keramik 30 x 30 ( motof / warna ) 1.0683 m2 37,100.00 39,633.93
Jumlah 72,928.93
NILAI HSPK 138,435.63
30 Pemasangan Lantai Granit (m2)
Upah
Mandor 0.0350 O.H 65,000.00 2,275.00
Kepala Tukang batu 0.0350 O.H 62,500.00 2,187.50
Tukang Batu 0.3500 O.H 60,000.00 21,000.00
Pekerja / buruh tak terampil 0.7000 O.H 57,206.00 40,044.20
Jumlah 65,506.70
Bahan
Semen PC (Portland Cement ) 50 kg 0.1960 zak 65,000.00 12,740.00
Semen berwarna Yiyitan 1.3000 kg 7,500.00 9,750.00
Pasir Pasang 0.0450 m3 130,000.00 5,850.00
Granit 1.0608 m2 250,000.00 265,200.00
Jumlah 293,540.00
NILAI HSPK 359,046.70
31 Pemasangan Tegel Keramik 20x25 cm ( dinding ) (m2)
Upah
Mandor 0.04500 O.H 65,000.00 2,925.00
Kepala Tukang batu 0.04500 O.H 62,500.00 2,812.50
Tukang Batu 0.4500 O.H 60,000.00 27,000.00
Pekerja / buruh tak termpil 0.9000 O.H 57,206.00 51,485.40
Jumlah 84,222.90
Bahan
Semen PC (Portland Cement ) 50 kg 0.1860 zak 49,500.00 9,207.00
Semen berwarna Yiyitan 1.9000 kg 9,000.00 17,100.00
Pasir Pasang 0.0180 m3 151,000.00 2,718.00
Tegel Keramik 20 x 25 cm ( dinding ) 1.0500 m2 37,100.00 38,955.00
Jumlah 67,980.00
NILAI HSPK 152,202.90
31 Pemasangan Tegel Keramik dinding 20 x 20 cm (m2)
Upah
Mandor 0.0450 O.H 65,000.00 2,925.00
Kepala Tukang batu 0.0450 O.H 62,500.00 2,812.50
Tukang Batu 0.4500 O.H 60,000.00 27,000.00
Pekerja / buruh tak termpil 0.9000 O.H 57,206.00 51,485.40
Jumlah 84,222.90
Bahan
Semen PC (Portland Cement ) 50 kg 0.1860 zak 65,000.00 12,090.00
Semen berwarna Yiyitan 1.9400 kg 9,000.00 17,460.00
Pasir Pasang 0.0180 m3 151,000.00 2,718.00
Tegel Keramik 20 x 20 cm 1.0600 m2 44,000.00 46,640.00
Jumlah 78,908.00
NILAI HSPK 163,130.90

32 Pemasangan Tegel Plin Dinding Keramik uk. 7,5 x 20 cm (m)


Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang batu 0.0090 O.H 62,500.00 562.50
Tukang Batu 0.0900 O.H 60,000.00 5,400.00
Pekerja / buruh tak termpil 0.0900 O.H 57,206.00 5,148.54
Jumlah 11,436.04
Bahan
Semen PC (Portland Cement ) 50 kg 0.0220 zak 65,000.00 1,430.00
Semen berwarna Yiyitan 0.0250 kg 9,000.00 225.00
Pasir Pasang 0.0030 m3 151,000.00 453.00
Tegel Plint Keramik warna / motif 5.2500 buah 5,400.00 28,350.00
Jumlah 30,458.00
NILAI HSPK 41,894.04
33 Pemasangan Rangka Atap Galvalum Uk.0.8 mm
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang Kayu 0.0100 O.H 62,500.00 625.00
Tukang Besi 0.1000 O.H 60,000.00 6,000.00
Pekerja / buruh tak terampil 0.4000 O.H 57,206.00 22,882.40
Jumlah 29,832.40
Bahan
Rangka Galvalume Uk.0.8mm 1.1000 m3 145,000.00 159,500.00
Jumlah 159,500.00
181. Pemasangan Atap Fiber Glass ( m2 )
Upah
Mandor 0.0070 O.H 65,000.00 455.00
Kepala Tukang kayu 0.0070 O.H 62,500.00 437.50
Tukang Kayu 0.0670 O.H 60,000.00 4,020.00
Pekerja / buruh tak terampil 0.1400 O.H 57,206.00 8,008.84
Jumlah 12,921.34
Bahan
Fiber Glass BWG 32 0.6790 m2 25,900.00 17,586.10
Sekrup 0.0500 buah 300.00 15.00
Jumlah 17,601.10
NILAI HSPK 30,522.44

181. Pemasangan Atap pollycarbonate ( m2 )


Upah
Mandor 0.0070 O.H 65,000.00 455.00
Kepala Tukang besi 0.0070 O.H 62,500.00 437.50
Tukang besi 0.0670 O.H 60,000.00 4,020.00
Pekerja / buruh tak terampil 0.1400 O.H 57,206.00 8,008.84
Jumlah 12,921.34
Bahan
Pollycarbonate 0.6790 m2 104,000.00 70,616.00
Sekrup 0.0500 buah 3,000.00 150.00
Jumlah 70,766.00
NILAI HSPK 83,687.34

34 Pemasangan wuwung genteng Beton ( m1 )


Upah
Mandor 0.0200 O.H 65,000.00 1,300.00
Kepala Tukang kayu 0.0200 O.H 62,500.00 1,250.00
Tukang kayu 0.2000 O.H 60,000.00 12,000.00
Pekerja / buruh tak terampil 0.4000 O.H 57,206.00 22,882.40
Jumlah 37,432.40
Bahan
Semen PC ( portland Cement ) 50 kg 0.2370 zak 34,850.00 8,259.45
Pasir pasang 0.0323 m3 40,000.00 1,292.00
Genteng wuwung beton 3.0000 buah 21,000.00 63,000.00
Jumlah 72,551.45
NILAI HSPK 109,983.85

35 Pemasangan genteng Beton


Upah
Mandor 0.0080 O.H 65,000.00 520.00
Kepala Tukang kayu 0.0080 O.H 62,500.00 500.00
Tukang kayu 0.0750 O.H 60,000.00 4,500.00
Pekerja / buruh tak terampil 0.1500 O.H 57,206.00 8,580.90
Jumlah 14,100.90
Bahan
Genteng Beton 20.0000 buah 7,500.00 150,000.00
Jumlah 150,000.00
NILAI HSPK 164,100.90
36 Pemasangan Talang Pembuluh Pipa PVC 5" ( m1 )
Upah
Tukang pipa 0.0675 O.H 60,000.00 4,050.00
Pekerja / buruh tak terampil 0.0337 O.H 57,206.00 1,927.84
Jumlah 5,977.84
Bahan
Pipa PVC 5" typeAW pj. 4 mtr 0.2500 lonjor 409,450.00 102,362.50
Klem PVC 1.0000 buah 1,650.00 1,650.00
Jumlah 104,012.50
NILAI HSPK 109,990.34

37 Pemasangan Plafond Kalsiboard Rangka Hollow 4x4 cm ( m2 )


Upah
Mandor 0.0750 O.H 65,000.00 4,875.00
Kepala Tukang Kayu 0.0250 O.H 62,500.00 1,562.50
Tukang Kayu 0.2500 O.H 60,000.00 15,000.00
Pekerja / buruh tak terampil 0.1500 O.H 57,206.00 8,580.90
Jumlah 30,018.40
Bahan
Kalsiboard t = 4mm 0.3819 m1 65,000.00 24,823.50
hollow 4/4 cm 2.7500 m1 23,000.00 63,250.00
skrup 4.0000 bh 3,000.00 12,000.00
prebal 4.0000 m1 1,000.00 4,000.00
casting 0.5000 kg 3,000.00 1,500.00
Jumlah 105,573.50
NILAI HSPK 135,591.90

225. Kusen pintu / jendela kayu meranti ( m3 )


Upah
Mandor 0.3000 O.H 65,000.00 19,500.00
Kepala Tukang Kayu 1.8000 O.H 62,500.00 112,500.00
Tukang Kayu 18.0000 O.H 60,000.00 1,080,000.00
Pekerja tak terampil 6.0000 O.H 57,206.00 343,236.00
Jumlah 1,555,236.00
Bahan
Kayu meranti( balok 6/15 cm ) 1.2000 m3 5,500,000.00 6,600,000.00
Paku Klem No.4 1.2500 kg 12,500.00 15,625.00
Lem Kayu 1.0000 kg 26,500.00 26,500.00
Jumlah 6,642,125.00
NILAI HSPK 8,197,361.00
39 Daun Pintu Teakwood ( m2 )
Upah
Mandor 0.0300 O.H 65,000.00 1,950.00
Kepala Tukang Kayu 0.2000 O.H 62,500.00 12,500.00
Tukang Kayu 2.0000 O.H 60,000.00 120,000.00
Pekerja tak terampil 0.6000 O.H 57,206.00 34,323.60
Jumlah 168,773.60
Bahan
Kayu Kamper ( slimar ) 0.0196 m3 6,750,000.00 132,300.00
Lem 0.3000 kg 26,500.00 7,950.00
Paku 0.3000 kg 12,500.00 3,750.00
Teakwood uk. 110 x 210 x 4 mm 1.0000 lembar 45,900.00 45,900.00
Jumlah 189,900.00
NILAI HSPK 358,673.60
41 Pemasangan kaca nako tebal 5 mm ( m2 )
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang Kayu 0.0050 O.H 62,500.00 312.50
Tukang Kayu 0.2000 O.H 60,000.00 12,000.00
Pekerja tak terampil 0.2000 O.H 57,206.00 11,441.20
Jumlah 24,078.70
Bahan
Krepyak nako 10.0000 buah 8,650.00 86,500.00
Kaca Rayban Tebal 5 cm 1.3600 m2 86,350.00 117,436.00
Sekrup 10.0000 buah 3,000.00 30,000.00
Jumlah 233,936.00
NILAI HSPK 258,014.70
39 Pemasangan kaca mati tebal 5 mm ( m2 )
Upah
Tukang Kayu 0.1500 O.H 60,000.00 9,000.00
Pekerja tak terampil 0.0500 O.H 57,206.00 2,860.30
Jumlah 11,860.30
Bahan
Kayu kamper 1/3 0.0020 m3 9,000.00 18.00
Kaca polos tebal 5 mm 1.0000 m2 70,000.00 70,000.00
Paku 0.0020 buah 9,950.00 19.90
Jumlah 70,000.00
NILAI HSPK 81,860.30
236. Pemasangan kaca mati rayban tebal 5 mm ( m2 )
Upah
Tukang Kayu 0.1500 O.H 60,000.00 9,000.00
Pekerja tak terampil 0.0500 O.H 57,206.00 2,860.30
Jumlah 11,860.30
Bahan
Kayu kamper 1/3 0.0020 daun 9,000.00 18.00
Kaca rayban tebal 5 mm 1.0000 m2 86,350.00 86,350.00
Paku 0.0020 buah 9,950.00 19.90
Jumlah 86,387.90
NILAI HSPK 98,248.20
40 Pemasangan listplafond Gypsum
Upah
Mandor 0.0013 O.H 65,000.00 84.50
Kepala Tukang Kayu 0.0075 O.H 62,500.00 468.75
Tukang Kayu 0.0750 O.H 60,000.00 4,500.00
Pekerja tak terampil 0.0250 O.H 57,206.00 1,430.15
Jumlah 6,483.40
Bahan
listplafond Gypsum 1.1000 m1 12,500.00 13,750.00
Paku 0.0500 kg 12,500.00 625.00
Jumlah 14,375.00
NILAI HSPK 20,858.40
41 Pemasangan Kunci tanam besar 2x putar kuningan ( buah )
Upah
Tukang Kayu 0.3600 O.H 60,000.00 21,600.00
Pekerja tak terampil 0.1500 O.H 57,206.00 8,580.90
Jumlah 30,180.90
Bahan
Kunci tanam besar 2x putar ( kuningan ) 1.0000 buah 81,250.00 81,250.00
Jumlah 81,250.00
NILAI HSPK 111,430.90
42 Pemasangan Engsel jendela ( stel )
Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Engsel H 1.0000 buah 27,100.00 27,100.00
Jumlah 27,100.00
NILAI HSPK 40,076.48

43 Pemasangan Engsel pintu ( stel )


Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Engsel H 1.0000 buah 27,100.00 27,100.00
Jumlah 27,100.00
NILAI HSPK 40,076.48

44 Pemasangan Engsel Kuningan utk jendela ( stel )


Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Engsel Kuningan 1.0000 buah 27,100.00 27,100.00
Jumlah 27,100.00
NILAI HSPK 40,076.48
45 Pemasangan Engsel Kuningan utk pintu ( stel )
Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Engsel Kuningan ( utk pintu ) 1.0000 buah 27,100.00 27,100.00
Jumlah 27,100.00
NILAI HSPK 40,076.48
46 Pemasangan Grendel ( buah )
Upah
Tukang Kayu 0.1200 O.H 60,000.00 7,200.00
Pekerja tak terampil 0.0600 O.H 57,206.00 3,432.36
Jumlah 10,632.36
Bahan
grendel panjang 1.0000 buah 9,000.00 9,000.00
Jumlah 9,000.00
NILAI HSPK 19,632.36
50 Pemasangan Grendel kuningan / croum ( buah )
Upah
Tukang Kayu 0.1200 O.H 60,000.00 7,200.00
Pekerja tak terampil 0.0600 O.H 57,206.00 3,432.36
Jumlah 10,632.36
Bahan
Grendel tanam 1.0000 buah 9,000.00 9,000.00
Jumlah 9,000.00
NILAI HSPK 19,632.36
51 Pemasangan Grendel Ekspanyolet ( buah )
Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Ekspanyolet 1.0000 buah 53,950.00 53,950.00
Jumlah 53,950.00
NILAI HSPK 66,926.48
52 Pemasangan hak angin sikutan ( stel )
Upah
Tukang Kayu 0.1400 O.H 60,000.00 8,400.00
Pekerja tak terampil 0.0800 O.H 57,206.00 4,576.48
Jumlah 12,976.48
Bahan
Hak angin sikutan Biasa 1.0000 buah 24,850.00 24,850.00
Jumlah 24,850.00
NILAI HSPK 37,826.48
53 Pemasangan hak angin sikutan kuningan ( stel )
Upah
Tukang Kayu 0.1200 O.H 60,000.00 7,200.00
Pekerja tak terampil 0.0600 O.H 57,206.00 3,432.36
Jumlah 10,632.36
Bahan
Hak angin kuningan lurus maju / mundur 1.0000 buah 24,850.00 24,850.00
Jumlah 24,850.00
NILAI HSPK 35,482.36
57 Pembongkaran Kayu ( m3 )
Upah
Mandor 0.2000 O.H 65,000.00 13,000.00
Kepala Tukang Kayu 0.4000 O.H 62,500.00 25,000.00
Tukang Kayu 4.0000 O.H 60,000.00 240,000.00
Pekerja Terampil 2.6700 O.H 59,000.00 157,530.00
Jumlah 435,530.00
NILAI HSPK 435,530.00
59 Pemasangan kusen aluminium profil 4" ( m1 )
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Kayu 0.0220 O.H 62,500.00 1,375.00
Tukang Kayu 0.2500 O.H 60,000.00 15,000.00
Pekerja Terampil 0.1500 O.H 59,000.00 8,850.00
Jumlah 26,200.00
Bahan
Aluminium 4" 1.0500 m1 65,000.00 68,250.00
Sekrup / ripet 5.0000 buah 3,000.00 15,000.00
Jumlah 83,250.00
NILAI HSPK 109,450.00
60 Pemasangan slimar aluminium profil 3/8" ( m1 )
Upah
Mandor 0.0150 O.H 65,000.00 975.00
Kepala Tukang Kayu 0.0350 O.H 62,500.00 2,187.50
Tukang Kayu 0.4000 O.H 60,000.00 24,000.00
Pekerja Terampil 0.2000 O.H 59,000.00 11,800.00
Jumlah 38,962.50
Bahan
Slimar Aluminium 3/8 1.0500 m1 28,000.00 29,400.00
Karet 0.0330 m3 22,250.00 734.25
Sekrup / ripet 5.0000 buah 3,000.00 15,000.00
Jumlah 45,134.25
NILAI HSPK 84,096.75
61 Pemasangan Titik stop kontak gedung ( titik )
Upah
Kepala tukang listrik 0.0500 0.H 62,500.00 3,125.00
Tukang listrik 0.2000 0.H 60,000.00 12,000.00
Pekerja terampil 0.0010 0.H 59,000.00 59.00
Jumlah 15,184.00
Bahan
Stop kontak ( broco ) 1.0000 buah 17,500.00 17,500.00
Kabel NYA 500 volt 2x2,5 mm2 10.0000 m1 11,500.00 115,000.00
Pipa pralon 5/8 1.0000 ljr 9,000.00 9,000.00
T Doos PVC 1.0000 buah 2,200.00 2,200.00
Jumlah 143,700.00
NILAI HSPK 158,884.00

62 Pemasangan MCB ( titik )


Upah
Kepala tukang listrik 0.0500 0.H 62,500.00 3,125.00
Tukang listrik 0.2000 0.H 60,000.00 12,000.00
Pekerja terampil 0.0010 0.H 59,000.00 59.00
Jumlah 15,184.00
Bahan
MCB 1.0000 buah 650,000.00 650,000.00
Jumlah 650,000.00
NILAI HSPK 665,184.00
63 Pemasangan Titik lampu gedung ( titik )
Upah
Kepala tukang listrik 0.0500 0.H 62,500.00 3,125.00
Tukang listrik 0.5000 0.H 60,000.00 30,000.00
Pekerja terampil 0.3000 0.H 59,000.00 17,700.00
Jumlah 50,825.00
Bahan
Isolator 0.7500 buah 5,000.00 3,750.00
Kabel NYA 500 volt 2x1,5 mm2 10.0000 m1 11,500.00 115,000.00
Pipa pralon 5/8 1.0000 ljr 9,000.00 9,000.00
T Doos PVC 1.0000 buah 2,200.00 2,200.00
Sewa Lass doof 2.0000 jam 1,000.00 2,000.00
Fitting Plafond 1.0000 buah 12,000.00 12,000.00
Jumlah 143,950.00
NILAI HSPK 194,775.00
64 Pemasangan Saklar Tunggal ( titik )
Upah
Kepala tukang listrik 0.0500 0.H 62,500.00 3,125.00
Tukang listrik 0.2000 0.H 60,000.00 12,000.00
Pekerja terampil 0.0010 0.H 59,000.00 59.00
Jumlah 15,184.00
Bahan
Saklar tunggal Broco 1.0000 buah 15,000.00 15,000.00
Jumlah 15,000.00
NILAI HSPK 30,184.00
65 Pemasangan Saklar Ganda ( titik )
Upah
Kepala tukang listrik 0.0500 0.H 62,500.00 3,125.00
Tukang listrik 0.2000 0.H 60,000.00 12,000.00
Pekerja terampil 0.0010 0.H 59,000.00 59.00
Jumlah 15,184.00
Bahan
Saklar ganda Broco 1.0000 buah 22,500.00 22,500.00
Jumlah 22,500.00
NILAI HSPK 37,684.00
73 Pemasangan pipa air bersih diamater 1/2' (m )
Upah
Tukang pipa 0.0818 O.H 60,000.00 4,908.00
Pekerja terampil 0.8128 O.H 59,000.00 47,955.20
Jumlah 52,863.20
Bahan
Pipa PVC 1/2 " type AW 1.1000 m 23,250.00 25,575.00
Lem PVC 0.1000 buah 12,100.00 1,210.00
Jumlah 26,785.00
NILAI HSPK 79,648.20
68 Pemasangan pipa air kotor diamater 4' (m )
Upah
Tukang pipa 0.0818 O.H 60,000.00 4,908.00
Pekerja terampil 0.8128 O.H 59,000.00 47,955.20
Jumlah 52,863.20
Bahan
Pipa PVC 4" type AW 0.2080 m 200,000.00 41,600.00
Lem PVC 0.5000 buah 12,100.00 6,050.00
Jumlah 47,650.00
NILAI HSPK 100,513.20
69 Pemasangan Kran Air Lokal ( buah )
Upah
Kepala Tukang Pipa 0.0300 O.H 62,500.00 1,875.00
Tukang pipa 0.1500 O.H 60,000.00 9,000.00
Jumlah 10,875.00
Bahan
Kran air 1.0000 buah 9,750.00 9,750.00
Rol TBA 1.0000 roll 8,200.00 8,200.00
Jumlah 17,950.00
NILAI HSPK 28,825.00
70 Pemasangan Avour metal ( buah )
Upah
Kepala Tukang Pipa 0.0300 O.H 62,500.00 1,875.00
Tukang pipa 0.1500 O.H 60,000.00 9,000.00
Jumlah 10,875.00
Bahan
Avour 1.0000 buah 21,000.00 21,000.00
Rol TBA 1.0000 roll 8,200.00 8,200.00
Jumlah 29,200.00
NILAI HSPK 40,075.00
71 Kloset Duduk Porselen ( buah )
Upah
Kepala Tukang batu 0.1500 O.H 62,500.00 9,375.00
Tukang Batu 1.5000 O.H 60,000.00 90,000.00
Jumlah 99,375.00
Bahan
Closet Jongkok porselen warna putih 1.0000 buah 850,000.00 850,000.00
Jumlah 850,000.00
NILAI HSPK 949,375.00
66 1 M Pemasangan Listplank Kayu Kamper
Upah
Mandor 0.0050 O.H 65,000.00 325.00
Kepala Tukang Kayu 0.0100 O.H 62,500.00 625.00
Tukang Kayu 0.1000 O.H 60,000.00 6,000.00
Pekerja Terampil 0.1000 O.H 59,000.00 5,900.00
Jumlah 12,850.00
Bahan
DAFTAR HARGA BAHAN

NO NAMA / JENIS BAHAN SATUAN HARGA


1 2 3 4
BAHAN PASIR
1 Pasir Urug / Tanah katel. M3 Rp 105,000.00
2 Pasir Pasang M3 Rp 130,000.00
3 Pasir Cor M3 Rp 145,000.00
4 Sirtu urug M3 Rp 75,000.00
5 Tanah Urug M3 Rp 90,000.00

BAHAN BATU
1 Batu bata tebal 5,5 cm. Bakaran kayu Bh Rp 550.00
2 Batu bata tebal 5,5 cm. Bakaran sekem. Bh Rp 550.00
3 Batu Kali Pecah 15/20 M3 Rp 163,300.00

BAHAN SEMEN / P.C.


1 Semen Gresik 40 kg zak Rp 48,500.00
2 Semen Gresik 1kg 1Kg Rp 1,212.50
3 Semen Gresik 50 kg zak Rp 60,625.00
4 Semen warna 1Kg Rp 9,000.00
5 casting 1Kg Rp 3,000.00

BAHAN AIR
1 AIR M3 Rp 13.00

BAHAN LANTAI.
1 Keramik lantai 40x40 cm ( KW I ) motif M2 Rp 43,100.00
2 Keramik tegel plint warna/motif 7,5x20 M1 Rp 4,900.00
BAHAN KAYU.
1 Kayu kamfer Slimar M3 Rp 6,500,000.00
2 Kayu Kamper Usuk Rp 6,500,000.00
3 Kayu Kamfer reng 3/5 M3 Rp 6,500,000.00
4 Kayu Kamper balok 6/12, 6/15 M3 Rp 6,500,000.00
5 Kayu Kamper balok 8/12 M3 Rp 6,500,000.00
6 Kayu Kamper 3/30 cm M3 Rp 6,500,000.00
7 Kayu Kamper 1/5cm M1 Rp 3,000.00
8 Kayu meranti balok 8/12, 6/15 M3 Rp 5,500,000.00
9 Keyu meranti usuk 5/7 M3 Rp 5,500,000.00
10 Keyu meranti usuk 3/5 M3 Rp 5,500,000.00
11 Kayu meranti papan 3/25/400 M3 Rp 5,500,000.00
12 Kayu meranti papan 2/20/400 M3 Rp 5,500,000.00
13 Kayu meranti papan 4/30/400 M3 Rp 5,500,000.00
14 Kayu glugu usuk 5/7 4meter 1 Btg Rp 85,000.00
15 Papan begesting (MC) M3 Rp 2,400,000.00
16 Balok kayu borneo M3 Rp 2,000,000.00
17 Balok kayu KW II M3 Rp 2,500,000.00
18 Kayu Jati papan 4/30 M3 Rp 11,000,000.00
19 Kayu Jati balok 6/15 M3 Rp 24,500,000.00
20 Kayu dolken. Btg Rp 11,500.00
21 Kayu Sirap Lbr/ 1m' Rp 57,000.00

BAHAN TRIPLEKS
1 taekwood 1.22x2.44x4mm lbr Rp 65,000.00
2 Lapis triplek 0,4cm lbr Rp 49,000.00
3 Triplek 120.240. x 6 mm lbr Rp 55,000.00
4 Multiplek 120.240. x 9 mm lbr Rp 122,000.00
5 Multiplek 120.240. x 9 mm m2 Rp 45,000.00
6 Triplek lapis formika lbr Rp 75,000.00
7 Triplek tebal 4 mm 1,10 x 2,10 m lbr Rp 40,300.00

BAHAN BESI
1 Besi beton Polos Kg Rp 10,000.00
2 Besi beton Ulir Kg Rp 10,000.00
3 Kawat bendrat Kg Rp 15,300.00
4 Paku triplek/eternit Kg Rp 14,000.00
5 Paku Asbes Kg Rp 14,500.00
6 Paku reng KG Rp 12,500.00
7 Paku usuk KG Rp 12,000.00
8 Paku eternit KG Rp 17,500.00
9 sekrup bh Rp 250.00
10 ripet/sekrup KG Rp 11,000.00
11 Paku Biasa 2"-5" Kg Rp 12,500.00
12 Paku 5 -10 cm KG Rp 11,000.00
13 Paku 12 cm dos Rp 14,500.00
14 Paku klem (no.4) KG Rp 15,000.00
15 Paku klem (no.4) doz Rp 27,100.00
16 Ripet bh Rp 250.00
17 Sealent bh Rp 25,000.00
18 besi Hollow 2/4 m1 Rp 13,500.00
19 besi Hollow 4/4 m1 Rp 20,000.00
20 besi Hollow 5/5 m1 Rp 25,000.00
22 Besi Profil WF Kg Rp 12,000.00
23 besi Baja Siku L Kg Rp 12,000.00
25 Pipa Besi Kg Rp 12,000.00
27 Angkur besi Ø 19 P= 50 cm bh Rp 37,000.00
29 Angkur bh Rp 5,000.00
33 Elektroda las Kg Rp 30,000.00
34 Elektroda baja(20%) Kg Rp 90,650.00
36 Mur baut Ø 16 mm bh Rp 2,000.00
37 Jarum keras bh Rp 7,500.00
38 Reng galvalum m1 Rp 16,500.00
39 Usuk galvalum t = 0,8 mm m1 Rp 27,000.00
40 Aluminium 4" m1 Rp 65,000.00
41 Slimar m1 Rp 19,450.00

BAHAN PENUTUP ATAP.


1 Genteng karang pilang Bh Rp 5,500.00
2 Genteng wuwung karang Pilang / Wisma Bh Rp 9,900.00
3 Eternit 1x1m tebal 4 mm Bh Rp 13,005.00
4 Listplank ( 0,08/0,30cm ) Woodflank m1 Rp 25,000.00
5 Gypsumt = 9 mm lbr Rp 50,000.00
6 Kalsiboard EG Uk. 240 x 120 x 9mm lbr Rp 60,000.00
7 list plafon gipsum m1 Rp 12,500.00
8 prebal plafon m1 Rp 1,000.00
Polycarbonat twinlite t = 6 mm m2 Rp 135,000.00
BAHAN PENGECATAN + POLITUR..
1 Kertas gosok lbr Rp 5,000.00
2 kertas gosok no. 150 lbr Rp 5,000.00
3 kertas gosok no. 280 lbr Rp 5,000.00
4 Plamir kayu Kg Rp 17,500.00
5 Plamir tembok Kg Rp 15,000.00
6 Cat kayu / besi Kg Rp 45,000.00
7 Cat tembok Kg Rp 35,000.00
8 Cat kayu penutup Kg Rp 37,500.00
9 Cat Meni Besi Kg Rp 20,000.00
10 Cat Meni Kayu Kg Rp 20,000.00
11 Cat genteng Kg Rp 30,000.00
12 Minyak cat / thiner B Ltr Rp 7,650.00
13 Minyak begisting Ltr Rp 4,800.00
14 solar Ltr Rp 4,500.00
15 Minyak pelumas Ltr Rp 24,400.00
16 Tinner A Ltr Rp 7,140.00
17 Spiritus Ltr Rp 11,220.00
18 Plitur jadi Ltr Rp 45,000.00
19 Lem putih " RAJAWALI " Kg Rp 9,000.00
20 Lem kayu kg Rp 10,000.00
21 Lem PVC bh Rp 6,000.00
22 Teer Kg Rp 25,000.00
23 Cherlag Kg Rp 2,500.00
24 Kuas / Rool Bh Rp 6,500.00
25 wood filler kg Rp 35,000.00
26 pewarna set Rp 7,000.00
27 waterproofing merk Aquaproof / setara Kg Rp 50,000.00
28 serat fiber m2 Rp 6,000.00
29 shanding kg Rp 35,000.00
30 clear doof kg Rp 47,000.00
31 tinner A special ltr Rp 10,200.00
32 coumpond kg Rp 15,000.00
33 sewa alat bantu ( 1 set 3 alat ) jam Rp 1,250.00
34 Cat Dasar kg Rp 5,600.00

BAHAN KACA.
1 Kaca Bening 5 mm m2 Rp 70,000.00
2 Kaca Bening 10 mm m2 Rp 270,000.00
BAHAN PENGGANTUNG & KUNCI
1 Kunci "ALPHA Bulat" 1 x putar Bh Rp 60,000.00
2 Kunci tanam besar 2 x putar kuningan Bh Rp 81,250.00
3 Kunci tanam kecil Bh Rp 37,300.00
4 Engsel kuningan pintu Stel Rp 20,400.00
5 Engsel kuningan jendela Stel Rp 20,400.00
6 Grendel tanam pintu Bh Rp 68,250.00
7 Grendel jendela Bh Rp 9,000.00
8 Hak angin bisa disetel maju/mundur Bh Rp 19,900.00
9 Fitting Plafond Bh Rp 9,750.00
10 Sunscreen m2 Rp 275,000.00

BAHAN PIPA PVC & SANITASI


1 Pipa Galvanis Ø 2" BT Rp 93,200.00
2 Pipa PVC 4" type AW pj 4 m Ljr Rp 140,000.00
3 Pipa PVC 3" type AW pj 4 m Ljr Rp 90,000.00
4 Pipa PVC 2" type AW pj 6 m Ljr Rp 200,000.00
5 Pipa PVC Ø5\ "AW panjang 4 mtr Ljr Rp 200,000.00
6 Pipa PVC Ø2\"C Ljr Rp 25,000.00
7 Pipa PVC Ø4\"C Btg Rp 55,000.00
8 Pipa PVC Ø3\"C Btg Rp 35,000.00
9 Pipa PVC D dia 1/2" 4 m Ljr Rp 20,000.00
10 Pipa PVC D dia 3/4" 4 m Ljr Rp 25,000.00
11 Pipa PVC D dia 1" 4 m Ljr Rp 30,000.00
12 Pipa PVC D dia 2" 4 m Ljr Rp 38,000.00
13 Pipa PVC D dia 3" 4 m Ljr Rp 61,500.00
14 Pipa PVC D dia 4" 4m Ljr Rp 86,000.00
15 Pipa paralon 5/8 Bh Rp 6,500.00
16 Talang " U " Maspion 4m Ljr Rp 85,000.00
17 Pengait talang PVC Bh Rp 7,500.00
18 Kran air "AMICO 1/2" Bh Rp 35,000.00
19 Kran air tuas stainless steel Bh Rp 111,500.00
20 Floor drains / plastik. Bh Rp 20,000.00
21 Roof drain drains Bh Rp 61,000.00
22 Floor drains / stainless steel Bh Rp 87,000.00
23 Tempat sabun Bh Rp 25,000.00
24 kloset jongkok Bh Rp 136,000.00
25 kloset duduk Bh Rp 800,000.00
26 Urinoir Bh Rp 350,000.00
27 washtafel Bh Rp 230,000.00
28 Roll TBA Bh Rp 9,500.00
29 pintu pvc set Rp 250,000.00
30 jetpump daya hisap 27m, pancar 12m, len set Rp 6,000,000.00
31 tandon pvc 1200ltr unit Rp 2,200,000.00
32 tandon air plastik kapasitas 1000 liter unit Rp 1,500,000.00
33 tandon air stanles kapasitas 1000 liter unit Rp 3,250,000.00
34 pelampumg set Rp 150,000.00
35 selotip Bh Rp 22,500.00
BAHAN ELEKTRIKAL.
1 Pasang listrik /Wirring. Ttk Rp 60,000.00
2 Lampu TL 1 x 10 w PHILIPS Bh Rp 39,600.00
3 Lampu TL 1 x 18 w Bh ?
4 Lampu TL 1 x 20 w PHILIPS Bh Rp 50,000.00
5 Lampu TL 1 x 40 w PHILIPS Bh Rp 75,000.00
6 Lampu SL 14 Watt Bh Rp 32,000.00
7 Lampu SL 18 Watt Bh Rp 35,000.00
8 Lampu SL 23 Watt Bh Rp 45,000.00
9 Lampu Tempel hias SL 18 Watt Bh Rp 130,000.00
10 Lampu TL 2 x 20 w PHILIPS Bh Rp 100,000.00
11 Lampu TL 2 x 40 w PHILIPS Bh Rp 150,000.00
12 fitting Down ligh Bh Rp 45,000.00
13 Isolator Bh Rp 5,000.00
14 Las Doof Bh Rp 350.00
15 Fiting Plafoond Bh Rp 10,000.00
16 T dos PVC Bh Rp 750.00
17 Stop kontak AC 16 AMPERE Bh Rp 45,000.00
18 Stop Kontak Bh Rp 17,500.00
19 Saklar tunggal Bh Rp 15,000.00
20 Sakla ganda Bh Rp 25,000.00
21 Kabel NYA 1000 Volt 2 x 1,5 mm M1 Rp 13,250.00
22 Kabel NYA 500 volt 2x 2,5 mm2 M1 Rp 11,500.00
22 Kabel NYA 1000 Volt 2 x 2,5 mm M1 Rp 15,000.00
23 Kabel NYY 1000 Volt 2 x 4 mm M1 Rp 25,000.00
24 Kabel fider 4x10mm M1 Rp 35,000.00
25 Kabel tray M1 Rp 50,000.00
26 MCB 3 Pas 50 A + (14 group) Unit Rp 1,055,000.00
27 MCB MG 10A bh Rp 50,000.00
28 Sekrering Tunggal "LN" biasa Bh Rp 50,000.00
29 Sekering ganda "LN" biasa Bh Rp 60,150.00
30 box panil 40x60 3pas lengkap bh Rp 800,000.00
31 Metal stud M2 Rp 70,000.00
32 Head Penangkal Petir modern non radio ak bh Rp 5,000,000.00
33 Speed tembaga Penangkal Petir bh Rp 250,000.00
34 Cable BC 10 mm M' Rp 9,500.00
35 Cable BC 50 mm M' Rp 40,000.00
36 Copper Rod 1/2" M' Rp 400,000.00
37 Dudukan Tiang penangkal Petir Kuningan bh Rp 150,000.00
38 Obstruction Lamp bh Rp 1,319,625.00
39 Grounding Penangkal Petir 4m bh Rp 724,500.00

ALAT SEWA
1 Sewa concret mixer 0.50 m3(min 3jam) Jam Rp 20,000.00
2 Sewa Concreate Pump (min 3 jam ) Jam Rp 12,000.00
3 Sewa vibrator roller ( min 5 jam) Jam Rp 8,000.00
4 sewa alat bantu ( 1 set 3 alat ) Jam Rp 30,000.00
5 Sewa crane min 8 jam (ternasuk mob/demo Jam Rp 225,000.00
6 Sewa alat injeksi min 8 jam (ternasuk mob/dem Jam Rp 185,000.00
7 Sewa Welding Set (min 5 jam) hari Rp 40,000.00

BETON
1 Tiang Pancang 20/20 m1 Rp 142,500.00
2 Tiang Pancang 25/25 m1 Rp 180,000.00
DAFTAR HARGA UPAH TENAGA KERJA

NO. URAIAN TENAGA SATUAN HARGA

1 2 3 4

1 MANDOR Org / hr Rp 65,000.00


2 Surveyor Geodesi Org / hr Rp 60,000.00
3 KepalaTukang Batu Org / hr Rp 62,500.00
4 KepalaTukang Besi Org / hr Rp 62,500.00
5 KepalaTukang Cat Org / hr Rp 62,500.00
6 KepalaTukang Kayu Org / hr Rp 62,500.00
7 KepalaTukang Listrik Org / hr Rp 62,500.00
8 KepalaTukang Pipa Org / hr Rp 62,500.00
9 Tukang Batu Org / hr Rp 60,000.00
10 Tukang Besi Org / hr Rp 60,000.00
11 Tukang Cat Org / hr Rp 60,000.00
12 Tukang Kayu Org / hr Rp 60,000.00
13 Tukang Las Org / hr Rp 60,000.00
14 Tukang Listrik Org / hr Rp 60,000.00
15 Tukang Pipa Org / hr Rp 60,000.00
16 Tukang Gali Org / hr Rp 60,000.00
17 Tukang Aspal Org / hr Rp 60,000.00
18 Tukang Plitur Org / hr Rp 60,000.00
19 Pekerja Org / hr Rp 59,000.00
20 Pekerja / Tdk Terampil Org / hr Rp 57,206.00
REKAPITULASI OWNER ESTIMATE

KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerin


PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya

No. JENIS PEKERJAAN


1 2

A. PEKERJAAN PERSIAPAN

B. PEKERJAAN GEDUNG RUANG KERJA/KANTOR

C. PEKERJAAN AULA

D. PEKERJAAN GUDANG

E. PEKERJAAN TEMPAT WUDLU

F. PEKERJAAN CANNOPY TEMPAT JEMURAN

G. PEKERJAAN CANNOPY MENUJU GUDANG

H. PEKERJAAN PAVING

I. PEKERJAAN TERALIS SEKOLAH

J. PEKERJAAN PAGAR KAMAR TIDUR

K. PEKERJAAN TERALIS GEDUNG KAMAR TIDUR

L. PEKERJAAN PINTU DAN JENDELA

M. PEKERJAAN AKHIR

JUMLAH
PPN 10 %
JUMLAH + PPN
DIBULATKAN
TERBILANG :

Satu Milyar Lima Ratus Dua Puluh Lima Juta Enam Ratus Delapan Puluh Satu Ribu Rupiah
ULASI OWNER ESTIMATE

Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah Daerah

JUMLAH HARGA
3

Rp 10,320,226.77

Rp 188,149,282.68

Rp 622,244,997.57

Rp 269,364,960.10

Rp 66,526,532.10

Rp 35,861,761.19

Rp 13,810,732.62

Rp 125,056,963.47

Rp 9,994,314.96

Rp 2,697,483.68

Rp 3,670,482.34

Rp 37,285,276.92

Rp 2,000,000.00

Rp 1,386,983,014.40
Rp 138,698,301.44
Rp 1,525,681,315.84
Rp 1,525,681,000.00

am Ratus Delapan Puluh Satu Ribu Rupiah

Surabaya,

KONSULTAN PERENCANA
CV. PERSADA UTAMA
PRIYONO, ST
DIREKTUR
OWNER ESTIMATE (OE)

KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah Daerah
PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya

HARSAT JUMLAH HARGA


No. JENIS PEKERJAAN VOLUME SAT
( Rp. ) ( Rp. )
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Mobilisasi dan Demobilisasi 1.00 Ls 500,000.00 500,000.00
2 Bongkaran penutup atap gedung existing + rangka 488.70 m2 6,045.60 2,954,484.72
3 Bongkaran plafon. 488.70 m2 6,045.60 2,954,484.72
4 Pembuatan Bowplang 42.31 m2 57,528.13 2,434,014.97
5 Pembersihan Lapangan Ringan 488.70 m2 3,022.80 1,477,242.36

Jumlah 10,320,226.77
B. PEKERJAAN GEDUNG RUANG KERJA/KANTOR
###
I Pekerjaan Kusen, Pintu dan Jendela
1 Kusen Alumunium 4' 128.96 M1 109,450.00 14,114,672.00
2 Pasang kaca Rayben 5 mm 28.70 M2 98,248.20 2,819,723.34
3 Engsel jendela 21.00 Set 40,076.48 841,606.08
4 Engsel Pintu 5.00 Set 40,076.48 200,382.40
5 Kunci pintu+handel 7.00 Set 111,430.90 780,016.30
6 Grendel Jendela 21.00 Bh 19,632.36 412,279.56
7 Slimar Alumunium 27.36 M1 84,096.75 2,300,887.08
8 Pas. Pintu HDF Singgle 7.00 Bh 1,242,900.00 8,700,300.00
###
II Pekerjaan Pengecatan
1 Pengecatan plafon 488.70 M2 20,941.55 10,234,135.49
2 Cat Listplank 16.46 M2 40,092.50 659,842.37
3 Pengecatan Genteng 214.24 M2 17,741.55 3,800,984.97
4 Pengecatan Dinding 273.84 M2 20,941.55 5,734,634.05
###
III Pekerjaan Instalasi Listrik
1 Instalasi lampu 42.00 M1 158,884.00 6,673,128.00
###
IV Pekerjaan Atap Baja Komposit
1 Kuda kuda WF 150 x 100 x 6 x 9 893.59 Kg 14,850.00 13,269,737.25
2 Gording C 150 x 65 x 20 X 3,2 638.89 Kg 13,750.00 8,784,751.25
3 Plat penyambung WF 255.96 Kg 14,850.00 3,801,006.00
4 Plat plendes t. = 10 mm 25.48 Kg 14,850.00 378,444.01
5 Plat penahan gording besi siku 70 x 70 x 7 mm 259.04 Kg 14,850.00 3,846,714.30
6 Reng/Usuk Galvalume 214.24 M2 189,332.40 40,562,950.09
7 Baut HTB Ø16 mm 392.00 Bh 2,000.00 784,000.00
8 Baut Angkur Ø19 mm 56.00 Bh 67,710.00 3,791,760.00
9 Genteng Beton 42.85 M2 164,100.90 7,031,460.67
10 Bubungan Beton 42.35 M1 109,983.85 4,657,816.05
11 Pas. Besi Track Stang Ø 16mm 200.49 Kg 10,725.00 2,150,244.53
12 Pas. Besi Penghubung gording Ø 10mm 114.96 Kg 10,725.00 1,232,959.73
13 Listplank woodplank 3/30/400 54.86 M3 52,450.00 2,877,407.00
14 Track Stang 15.00 Bh 7,500.00 112,500.00
15 Plat Stifner 8 mm 127.35 Kg 9,750.00 1,241,647.68
16 Perakitan Baja 1,941.27 Kg 264.88 514,193.61
17 Pengelasan Baja 1,941.27 Kg 1,307.00 2,537,238.48
###
V Pekerjaan Plafond
1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow 198.02 M2 135,591.90 26,849,908.04
2 List Plafon gypsum 168.00 M1 20,858.40 3,504,211.20
VI Pekerjaan Talang
1 Pemasangan Talang 26.80 M1 109,990.34 2,947,741.17

Jumlah 188,149,282.68

C. PEKERJAAN AULA
I Pekerjaan Atap Baja Galvalum
1 Reng/Usuk Galvalume 848.03 M2 189,332.40 160,560,123.99
2 Genteng beton 169.61 M2 164,100.90 27,832,595.85
3 Bubungan beton 81.60 M1 109,983.85 8,974,682.16
4 Listplank woodplank 3/30/400 200.52 M3 52,450.00 10,517,274.00

II Pekerjaan Kusen, Pintu dan Jendela


1 Kusen Alumunium 4' 257.92 M1 109,450.00 28,228,906.20
2 Pasang kaca rayben 5 mm 44.61 M2 98,248.20 4,382,655.71
3 Engsel jendela 48.00 Bh 40,076.48 1,923,671.04
4 Grendel Jendela 24.00 Bh 19,632.36 471,176.64
5 Slimar Alumunium 126.59 M1 84,096.75 10,645,975.78
6 Engsel Pintu 4.00 Set 40,076.48 160,305.92
7 Kunci pintu+handel 4.00 Set 111,430.90 445,723.60

III Pekerjaan Plafon


1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow 804.11 M2 135,591.90 109,030,802.71
2 List Plafon gypsum 165.20 M1 20,858.40 3,445,807.68

IV Pekerjaan Pengecatan
1 Pengecatan Plafon 804.11 M2 20,941.55 16,839,309.77
2 Pengecatan lisplang 60.16 M2 40,092.50 2,411,804.43
3 Pengecatan dinding 820.00 M2 20,941.55 17,172,071.00
4 Pengecatan Genteng 848.03 M2 17,741.55 15,045,419.95

V Pekerjaan Lantai
Pemasangan
1 Lantai Granit 544.79 M2 359,046.70 195,605,051.69
Urugan
2 pasir bawah lantai t = 10 cm 54.48 M3 156,971.30 8,551,639.45
Jumlah 622,244,997.57
ANALISA HARGA SATUAN POKOK PEKERJAAN

KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemer


PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya

NO URAAIN PEK KOEF SAT

1 1 Titik Pas. Uitzet bouwplank


Kayu meranti papan 2/20 0.0080 m3
Kayu meranti usuk (4/6) 0.0120 m3
paku 0.0500 kg
pekerja ( buruh tak trampil ) 0.1000 oh
tukang kayu 0.1000 oh
kepala tukang 0.0100 oh
mandor 0.0045 oh

2 1 m2 Pembongkaran Rangka dan Penutup Atap Tidak Dipakai Kembali


pekerja 0.1000 oh
mandor 0.0050 oh

3 1 m2 pembongkaran asbes + rangka


pekerja 0.0900 oh
mandor 0.0450 oh

4 1 M3 bongkar pas. batu bata


Pekerja / Buruh Tak Terampil 0.2500 oh
mandor 0.1000 oh

5 1 M2 kusen
pekerja 0.8000 oh
mandor 0.0400 oh

6 1 M2 bongkar Kaso dan reng +kuda


pekerja 0.2000 oh
tukang 0.1000 oh
kepala tukang 0.0500 oh
mandor 0.0025 oh

7 1 M3 galian tanah keras


Pekerja / Buruh Tak Terampil 0.0320 oh
mandor 1.0000 oh

8 1 M3 urugan sirtu
sirtu 1.2000 m3
Pekerja / Buruh Tak Terampil 0.2500 oh
mandor 0.0250 oh

9 1 m3 Pemasangan Batu Kali Belah Kosongan (aanstamping)


Mandor 0.0390 O.H
Kepala tukang batu 0.0390 O.H
Tukang Batu 0.3900 O.H
Tenaga Kasar 0.7800 O.H
Batu Kali Belah 15/20 cm 1.2000 m3
Pasir Urug 0.4320 m3

10 1 M3 Pemasangan batu kali belah 15/20 cm (1 Pc : 4 Ps )


Mandor 0.0750 O.H
Kepala Tukang Batu 0.0750 O.H
Tukang Batu 0.7500 O.H
Tenaga Kasar 1.5000 O.H
Semen portland (50kg) 3.2600 Zak
Pasir Pasang 0.5200 m3
Batu Kali Belah 15/20 cm 1.2000 m3

11 1 m2 acuan / begisting beton untuk sloof


kayu bekisting ( mc ) 0.0450 m3
paku usuk 0.3000 kg
Mimyak begisting 0.1000 ltr
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh
12 1 m3 Membuat beton , 1 Pc : 3 Ps : 5 Kr ( lantai kerja )
semen pc 4.6000 zak
pasir cor 0.5581 M3
koral beton 0.5405 M3
air 215.0000 ltr
pekerja 1.2000 oh
tukang Batu 0.2000 oh
kepala tukang Batu 0.0200 oh
mandor 0.0600 oh

13 1 KG Besi beton polos


besi 1.0500 kg
bendrat 0.0150 kg
pekerja 0.0070 oh
tukang besi 0.0070 oh
kepala tukang besi 0.0007 oh
mandor 0.0004 oh

14 1 KG Besi beton Ulir


besi 1.0500 kg
bendrat 0.0150 kg
pekerja 0.0070 oh
tukang besi 0.0070 oh
kepala tukang besi 0.0007 oh
mandor 0.0004 oh

PEK BEKISTING
15 1 m2 acuan / begisting beton untuk Poor
kayu bekisting ( mc ) 0.0450 m3
paku usuk 0.3000 kg
Mimyak begisting 0.1000 ltr
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh

2 x pakai untuk pek. Pondasi dalam 1 m3 = 0.5000


16 1 m2 acuan / begisting beton untuk sloof
kayu bekisting ( mc ) 0.0450 m3
paku usuk 0.3000 kg
Mimyak begisting 0.1000 ltr
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh

2 x pakai dalam 1 m3 = 0.5000


17 1 m2 acuan / begisting beton untuk kolom
kayu bekisting ( mc ) 0.0400 m3
paku usuk 0.4000 kg
Mimyak begisting 0.2000 ltr
balok kayu 3/5 meranti 0.0150 m3
Multiplek 120.240. x 9 mm 0.3500 lbr
dolken kayu gelam, Ø ( 8-10) cm, p=4m 2.0000 btg
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh

2 x pakai dalam 1 m3 = 0.5000


3 x pakai dalam 1 m3 = 0.3333
4 x pakai dalam 1 m3 = 0.2500
18 1 m2 acuan / begisting beton untuk balok
kayu bekisting ( mc ) 0.0400 m3
paku usuk 0.4000 kg
Mimyak begisting 0.2000 ltr
balok kayu 3/5 meranti 0.0180 m3
Multiplek 120.240. x 9 mm 0.3500 lbr
dolken kayu gelam, Ø ( 8-10) cm, p=4m 2.0000 btg
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh

2 x pakai dalam 1 m3 = 0.5000


3 x pakai dalam 1 m3 = 0.3333
4 x pakai dalam 1 m3 = 0.2500
19 1 m2 acuan / begisting beton untuk lantai
kayu meranti bekisting 0.0400 m3
paku usuk 0.4000 kg
Mimyak begisting 0.2000 ltr
balok kayu 3/5 meranti 0.0150 m3
Multiplek 120.240. x 9 mm 0.3500 lbr
dolken kayu gelam, Ø ( 8-10) cm, p=4m 6.0000 btg
pekerja 0.6600 oh
tukang kayu 0.3300 oh
kepala tukang kayu 0.0330 oh
mandor 0.0330 oh

2 x pakai dalam 1 m3 = 0.5000


4 x pakai dalam 1 m3 = 0.2500
20 1 m2 pembongkaran dan penyiraman
pekerja 2.0000 oh

21 1 m3 beton sloof4 25/30


Beton bertulang K 225 1.0000 m3
Besi beton ( polos / ulir ) 196.5366 kg
Bekisting sloof 2x pakai 6.6667 m2
Pembongkaran dan penyiraman 1.0000 m3

22 1 m3 beton Kolom 25/25


Beton bertulang K 225 1.0000 m3
Besi beton ( polos / ulir ) 250.6173 kg
Bekisting kolom 2x pakai 3.4821 m2
Pembongkaran dan penyiraman 1.0000 m3

23 1 m3 beton balok Balok 25/30


Beton bertulang K 225 1.0000 m3
Besi beton ( polos / ulir ) 152.7493 kg
Bekisting balok 2x pakai 6.6667 m2
Pembongkaran dan penyiraman 1.0000 m3

24 1 M2 pas. Batu bata 1Pc : 3 Ps. / Rolag


Bata merah 70.0000 bh
semen 50 kg 0.2874 zak
pasir pasang 0.0400 m3
pekerja 0.3000 oh
tukang batu 0.1000 oh
kepala tukang batu 0.0100 oh
mandor 0.0150 oh

dalam 1 M3 = 8.3333
25 1 M2 pas. Batu bata 1Pc : 5 Ps.
Bata merah 70.0000 bh
semen 50 kg 0.1936 zak
pasir pasang 0.0450 m3
pekerja 0.3000 oh
tukang batu 0.1000 oh
kepala tukang batu 0.0100 oh
mandor 0.0150 oh

dalam 1 M3 = 8.3333
26 1 M2 pas. plesteran 1Pc : 3 Ps ( t: 1.5 cm)
semen 50 kg 0.1555 zak
pasir pasang 0.0200 m3
pekerja 0.3000 oh
tukang batu 0.1500 oh
kepala tukang batu 0.0150 oh
mandor 0.0150 oh

27 1 M2 pas. plesteran 1Pc : 5 Ps ( t: 1.5 cm)


semen 50 kg 0.1036 zak
pasir pasang 0.0240 m3
pekerja 0.3000 oh
tukang batu 0.1500 oh
kepala tukang batu 0.0150 oh
mandor 0.0150 oh
28 1 M2 acian
semen 40 kg 0.0813 zak
pekerja 0.2000 oh
tukang batu 0.1000 oh
kepala tukang batu 0.0100 oh
mandor 0.0100 oh

29 1 M1 benangan / Tali Air


semen 40 kg 0.0125 Zak
Pasir pasang 0.0130 m3
tukang batu 0.1200 oh

30 1M2 melamin
wood filler 0.2000 kg
pewarna 0.5000 set
kertas gosok no. 150 1.0000 lbr
kertas gosok no. 280 1.0000 lbr
shanding 0.5000 kg
clear doof 0.2000 kg
tinner A special 0.8370 ltr
coumpond 0.2000 kg
sewa alat bantu ( 1 set 3 alat ) 1.0000 set
sewa compresor 0.6250 jam
pekerja 0.0750 oh
tukang cat 0.0900 oh
kepala tukang cat 0.0090 oh
mandor 0.0250 oh

31 1M2 Pek. Plitur 2x sampai rata


Kertas gosok 0.5000 lbr
Spritus 0.6600 ltr
Cerlak 0.0340 kg
tukang cat 0.8800 oh

32 1M2 pengecatan kayu/besi


cat meni kayu 0.1500 kg
plamir kayu 0.3000 kg
cat kayu 0.2000 kg
cat penutup 0.3000 kg
pekerja 0.0700 oh
tukang cat 0.1050 oh
kepala tukang cat 0.0040 oh
mandor 0.0025 oh

33 1M2 pengecatan tembok


cat penutup 2 kali 0.1800 kg
cat dasar 0.1200 kg
pekerja 0.0280 oh
tukang cat 0.0420 oh
kepala tukang cat 0.0042 oh
mandor 0.0250 oh

34 1M2 plamur tembok


plamir tembok 0.1000 kg
Ampelas no 150 0.5000 Lbr
pekerja 0.0200 oh
tukang cat 0.0300 oh
kepala tukang cat 0.0030 oh
mandor 0.0010 oh

35 1 M2 Pengecatan Tembok (1 lapis cat dasar, 2 lapis cat penutup)


Plamir tembok 1.0000 M2
Pengecatan tembok 1.0000 M2

36 1M2 pengecatan besi


cat meni 0.1000 kg
Kuas 0.0100 Bh
pekerja 0.0200 oh
tukang cat 0.2000 oh
kepala tukang cat 0.0200 oh
mandor 0.0100 oh

37 1 M3 urugan pasir
pasir urug 1.2000 m3
Pekerja / Buruh Tak Terampil 0.3000 oh
mandor 0.0100 oh
38 1 M2 pas. Keramik lantai 40x40 cm
keramik 40x40 motif 1.0683 M2
Semen portland 50kg 0.1960 zak
Pasir pasang 0.0450 m3
Semen warna 1.3000 Kg
Pekerja 0.7000 oh
Tukang batu 0.3500 oh
Kepala tukang 0.0350 oh
Mandor 0.0350 oh

39 1 M2 pas. Keramik lantai 20x20 cm


keramik 20x20 1.0600 M2
Semen portland 50kg 0.2080 Zak
Pasir pasang 0.0450 m3
Semen warna 1.6200 Kg
Pekerja 0.7000 oh
Tukang batu 0.3500 oh
Kepala tukang 0.0350 oh
Mandor 0.0350 oh

40 1 M2 pas. keramik dinding plint


Dinding 20x25 cm 1.0500 m2
Semen portland 50kg 0.1860 Zak
Pasir pasang 0.0180 m3
Semen warna 1.9400 Kg
Pekerja 0.9000 oh
Tukang batu 0.4500 oh
Kepala tukang 0.0450 oh
Mandor 0.0450 oh

41 1 M' pas. keramik stepnoosing


Keramik stepnoosing 5.2500 m'
Semen portland 50kg 0.0023 Zak
Pasir pasang 0.0030 m3
Semen warna 0.0250 Kg
Pekerja 0.0900 oh
Tukang batu 0.0900 oh
Kepala tukang 0.0090 oh
Mandor 0.0050 oh

42 1 m2 daun pintu lapis doble teak wood uk.1.22x2.44x3mm


taek wood uk.1.22x2.44x3mm 1.0000 Lembar
kayu papan4/kamper ( slimar) 0.0196 m3
lem kayu 0.3000 kg
Paku klem (no.4) 0.3000 dos
pekerja 0.6000 oh
tukang kayu 2.0000 oh
kepala tukang kayu 0.2000 oh
mandor 0.0300 oh

43 1 m2 pas. Kaca es/buram t= 5 cm


kaca 1.1000 m2
pekerja 0.0150 hr
tukang kayu 0.1500 hr
kepala tukang kayu 0.0150 hr
mandor 0.0008 hr

44 1 m3 pek. Kusen Pintu Jendela Kayu Kamper


Kayu Kamper Balok 6/15 1.2000 m3
paku klem 1.2500 kg
lem kayu 1.0000 kg
pekerja 6.0000 oh
tukang 18.0000 oh
kepala tukang 1.8000 oh
mandor 0.3000 oh

45 1 m2 pek. Pintu / Jendela Kaca


Kayu Kamper Papan 0.0240 m3
lem kayu 0.3000 kg
pekerja 0.8000 oh
tukang 2.0000 oh
kepala tukang 0.2000 oh
mandor 0.0400 oh
46 1 m2 pek. Pintu Panil
Kayu Kamper 0.0400 m3
Paku 0.0500 kg
pekerja 1.0000 oh
tukang 3.0000 oh
kepala tukang 0.3000 oh
mandor 0.0500 oh

47 1 m2 pas. Kaca Polos t = 5 cm


kaca 1.1000 m2
pekerja 0.0150 oh
tukang kayu 0.1500 oh
kepala tukang kayu 0.0150 oh
mandor 0.0008 oh

48 1 Unit Pintu PVC ( pabrikasi )


Pintu PVC Pabrikasi 1.0000 set
pekerja 0.6000 oh
tukang kayu 2.0000 oh
kepala tukang kayu 0.2000 oh
mandor 0.0300 oh

49 1 unit pemasangan titik lampu


kabel NYA 1000 volt 2 x 2.5 mm2 10.0000 m1
pipa paralon 5/8 1.0000 ljr
isolator 4.0000 bh
las doof 1.0000 bh
Tdos PVC 1.0000 bh
fitting plafon 1.0000 bh
Pekerja 0.3000 oh
Tukang listrik 0.5000 oh
Kepala tukang listrik 0.0500 oh

50 1 unit pemasangan stop kontak


stop kontak 1.0000 unit
kabel NYA 1000 volt 2 x 2.5 mm2 10.0000 m1
pipa paralon 5/8 1.0000 ljr
isolator 1.0000 bh
Tdos PVC 1.0000 bh
Pekerja 0.0010 oh
Tukang listrik 0.2000 oh
Kepala tukang listrik 0.0500 oh

51 1 unit pemasangan stok kontak AC


stop kontak AC 1.0000 unit
kabel NYA 1000 volt 3 x 2.5 mm2 15.0000 m1
pipa paralon 5/8 1.0000 ljr
isolator 10.0000 bh
las doof 6.0000 bh
Tdos PVC 2.0000 bh
Pekerja 1.0000 oh
Tukang listrik 1.0000 oh
Kepala tukang listrik 0.0500 oh

52 1 bh lampu SL 10 watt
lampu SL 14 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh

53 1 bh lampu SL 18 watt
lampu SL 18 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh

54 1 bh lampu SL 23 watt
lampu SL 23 watt phlip 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh

55 1 bh pemasangan saklar tunggal


saklar tunggal ( ex broco ) 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh
56 1 bh pemasangan saklar ganda
saklar tganda ( ex broco ) 1.0000 unit
pekerja 0.0010 oh
tukang 0.2000 oh
kepala tukang 0.0500 oh

57 1 Set Pek. SDP 3 Phase 63A (15 Grup) Lt. 01 1.0000


dan + 1 grounding
MCCB 3P 25A (MG) 1.0000 Buah
MCB 1 Phasa 4 Ampere (MG) 4.5KA Buah
MCB 1 Phasa 6 Ampere (MG) Buah
MCB 1 Phasa 10 Ampere (MG) 13.0000 Buah
Lampu RST 3.0000 Buah
Box Panel Ukuran 40 x 60 x 20 (SAKA) 1.0000 Unit
Wiring + Accessoris 1.0000 Buah
Tembaga 1.0000 Ls
Lampu Emergency 1.0000 Buah
CT 200 / 5 (GAE) 3.0000 Buah
grounding BC 10 mm 6.0000 m
ongkos pasang 1.0000 bh

58 1 bh pemasangan MCB 3 Pas 50 A + (14 group)


MCB 3 Pas 50 A + (14 group) 1.0000 unit
pekerja 0.5000 oh
tukang 0.2500 oh
kepala tukang 0.1000 oh

59 1 set box panil 40x60


box panil 40x60. 3pas lemgkap 1.0000 unit
Kabel NYA 1000 Volt 4 mm 4.0000 m1
pekerja 0.9000 oh
tukang 0.4500 oh
kepala tukang 0.2500 oh

60 1 m1 pas. Kabel fider + oper spaneng


Kabel fider 4x10mm 1.0000 m1
pekerja 0.1000 oh
tukang 0.0500 oh
kepala tukang 0.0500 oh
61 1 m1 kabel grounding 10 mm2
Kabel grounding 10 mm 1.0000 m1
pekerja 0.1000 oh
tukang 0.0500 oh
kepala tukang 0.0500 oh

62 1 m1 pas. Kabel tray


Kabel tray 1.0000 m1
pekerja 0.1000 oh
tukang 0.0500 oh
kepala tukang 0.0500 oh

63 1 m1 kabel grounding BC 50 mm
Kabel grounding 10 mm 1.0000 m1
pekerja 0.1000 oh
tukang 0.0500 oh
kepala tukang 0.0500 oh

64 1 M3 Pemasangan kuda kuda kayu jati (Bent. Max 6m)


Mandor 0.2000 O.H
Kepala Tukang Kayu 1.2000 O.H
Tukang Kayu 12.0000 O.H
Tenaga Kasar 4.0000 O.H
Kayu Jati (balok 8/12) 1.1000 m3
Besi plat strip + Baut Mur 15.0000 Kg
Paku Klem (No 4) 5.6000 Doz

65 1 M2 Pemasangan Reng kamper/Usuk kamper


Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pembantu Tukang Kayu 0.1000 O.H
Kayu kamper reng 3/5 0.0072 m3
Kayu Kamper Usuk (5/7) 0.0140 Kg
Paku Reng 0.2500 Doz

66 1 M3 Pemasangan Gording kamper


Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pembantu Tukang Kayu 0.1000 O.H
Kayu kamper reng 3/5 0.0072 M3
Besi plat strip + Baut Mur 0.0140 Kg
Paku Reng 0.2500 Doz

67 1 m2 pek. Pasang Genteng Karangpilang


Genteng 25.0000 Bh
pekerja 0.1500 OH
tukang 0.0750 OH
kepala tukang 0.0080 OH
mandor 0.0080 OH

68 1 M3 Pemasangan Listplank Kayu Kamper


Mandor 0.0050 O.H
Kepala Tukang Kayu 0.0100 O.H
Tukang Kayu 0.1000 O.H
Pembantu Tukang Kayu 0.1000 O.H
Kayu meranti papan 4/30/400 0.0072 m3
Paku Reng 0.2500 Doz

64 1 kg. Pek. Besi Profil


Besi Profil 1.1500 kg
pekerja 0.0600 oh
tukang 0.0600 oh
kepala tukang 0.0060 oh
mandor 0.0030 oh

65 1 bh Pekerjaan Pemasangan Baut Mur Baja Ø 16 mm


mur baut 16 mm 1.0000 bh
Pekerja 0.0600 oh
Tukang las 0.0600 oh
Kepala tukang 0.0060 oh
Mandor 0.0030 oh

66 1 bh Pekerjaan Pemasangan Baut Mur Baja Ø 19 mm


mur baut 12 mm 1.0000 bh
Pekerja 0.0600 oh
Tukang las 0.0600 oh
Kepala tukang 0.0060 oh
Mandor 0.0030 oh

67 1 m2. Pasang reng/usuk galvalum


Reng/usuk galvalum 5.5000 m1
Usuk galvalum t = 0,8 mm 2.2000 m1
sekrup 1.0000 kg
pekerja 0.4000 O.H
tukang 0.1000 O.H
kepala tukang 0.0100 O.H
mandor 0.0050 O.H

68 1 m2 pek. Pasang Genteng Karangpilang


Genteng 25.0000 bh
pekerja 0.1500 oh
tukang 0.0750 oh
kepala tukang 0.0080 oh
mandor 0.0080 oh
69 1 m' pek. Pasang Wuwung Genteng Karangpilang
Genteng Wuwung 3.0000 bh
semen 0.1600 zak
pasir pasang 0.0323 m3
pekerja 0.4000 oh
tukang 0.2000 oh
kepala tukang 0.0200 oh
mandor 0.0020 oh
70 1 M2 Pemasangan Plafon Triplek Rangka Kayu Meranti
Mandor 0.0135 O.H
Kepala Tukang Kayu 0.0400 O.H
Tukang Kayu 0.4000 O.H
Pembantu Tukang Kayu 0.2700 O.H
Kayu Meranti (Balok 5/7) 0.0230 m3
Triplek tebal 4 mm 1,10 x 2,10 m 0.3900 Lbr
Paku Triplek/Eternit 0.0600 Doz

71 1 m1 pas. List Plafon gipsum


List plafon gipsum 1.0000 m1
skrup 1.0000 bh
casting 0.0500 kg
pekerja 0.1500 oh
tukang 0.2500 oh
kepala tukang 0.0250 oh
mandor 0.0750 oh
OKOK PEKERJAAN

as Gedung Pemerintah dan Pemerintah Daerah

HARSAT (Rp) JUMLAH (Rp)

Rp 5,500,000.00 Rp 44,000.00
Rp 5,500,000.00 Rp 66,000.00
Rp 12,000.00 Rp 600.00
Rp 57,206.00 Rp 5,720.60
Rp 60,000.00 Rp 6,000.00
Rp 62,500.00 Rp 625.00
Rp 65,000.00 Rp 292.50
Jumlah Rp 123,238.10

Rp 42,500.00 Rp 4,250.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 4,575.00

Rp 42,500.00 Rp 3,825.00
Rp 65,000.00 Rp 2,925.00
Jumlah Rp 6,750.00
2+3 Rp 11,325.00

Rp 41,900.00 Rp 10,475.00
Rp 65,000.00 Rp 6,500.00
Jumlah Rp 16,975.00

Rp 42,500.00 Rp 34,000.00
Rp 65,000.00 Rp 2,600.00
Jumlah Rp 36,600.00

Rp 42,500.00 Rp 8,500.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 3,000.00
Rp 65,000.00 Rp 162.50
Jumlah Rp 17,162.50
4+5+6 Rp 70,737.50

Rp 41,900.00 Rp 1,340.80
Rp 65,000.00 Rp 65,000.00
Jumlah Rp 66,340.80

Rp 75,000.00 Rp 90,000.00
Rp 41,900.00 Rp 10,475.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 102,100.00

60,000.00 2,340.00
55,000.00 2,145.00
50,000.00 19,500.00
30,000.00 23,400.00
163,300.00 195,960.00
133,400.00 57,628.80
Jumlah Rp 300,973.80

60,000.00 4,500.00
55,000.00 4,125.00
50,000.00 37,500.00
30,000.00 45,000.00
55,800.00 181,908.00
144,900.00 75,348.00
163,300 195,960.00
Jumlah Rp 539,841.00

Rp 60,000.00 Rp 2,700.00
Rp 55,000.00 Rp 16,500.00
Rp 50,000.00 Rp 5,000.00
Rp 30,000.00 Rp 19,800.00
Rp 55,800.00 Rp 18,414.00
Rp 144,900.00 Rp 4,781.70
Rp 163,300.00 Rp 5,388.90
Jumlah Rp 72,584.60
Rp 48,500.00 Rp 223,100.00
Rp 145,000.00 Rp 80,924.50
Rp 140,000.00 Rp 75,670.00
Rp 13.00 Rp 2,795.00
Rp 42,500.00 Rp 51,000.00
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 1,200.00
Rp 65,000.00 Rp 3,900.00
Jumlah Rp 449,589.50

Rp 10,000.00 Rp 10,500.00
Rp 15,300.00 Rp 229.50
Rp 59,000.00 Rp 413.00
Rp 60,000.00 Rp 420.00
Rp 62,500.00 Rp 43.75
Rp 65,000.00 Rp 22.75
Jumlah Rp 11,629.00

Rp 10,000.00 Rp 10,500.00
Rp 15,300.00 Rp 229.50
Rp 59,000.00 Rp 413.00
Rp 60,000.00 Rp 420.00
Rp 62,500.00 Rp 43.75
Rp 65,000.00 Rp 22.75
Jumlah Rp 11,629.00

Rp 2,400,000.00 Rp 108,000.00
Rp 12,000.00 Rp 3,600.00
Rp 4,800.00 Rp 480.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 175,027.50
x Rp 181,935.00

Rp 2,400,000.00 Rp 108,000.00
Rp 12,000.00 Rp 3,600.00
Rp 4,800.00 Rp 480.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 175,027.50
x Rp 181,935.00
Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 82,500.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 23,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 312,907.50
x Rp 250,875.00
x Rp 272,162.50
x Rp 314,280.00

Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 99,000.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 23,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 329,407.50
x Rp 259,125.00
x Rp 277,662.50
x Rp 318,405.00
Rp 2,400,000.00 Rp 96,000.00
Rp 12,000.00 Rp 4,800.00
Rp 4,800.00 Rp 960.00
Rp 5,500,000.00 Rp 82,500.00
Rp 122,000.00 Rp 42,700.00
Rp 11,500.00 Rp 69,000.00
Rp 59,000.00 Rp 38,940.00
Rp 60,000.00 Rp 19,800.00
Rp 62,500.00 Rp 2,062.50
Rp 65,000.00 Rp 2,145.00
Jumlah Rp 358,907.50
x Rp 273,875.00
x Rp 325,780.00

Rp 59,000.00 Rp 118,000.00
Jumlah Rp 118,000.00

Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 2,204,010.57
Rp 156,690.00 Rp 1,044,605.22
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,018,984.16

Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 2,810,485.06
Rp 225,630.00 Rp 785,666.22
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,366,519.65

Rp 685,368.37 Rp 685,368.37
Rp 11,214.25 Rp 1,712,968.84
Rp 233,880.00 Rp 1,559,207.80
Rp 85,000.00 Rp 85,000.00
Jumlah Rp 4,042,545.00

Rp 550.00 Rp 38,500.00
Rp 60,625.00 Rp 17,423.63
Rp 130,000.00 Rp 5,200.00
Rp 41,900.00 Rp 12,570.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 80,768.63
X Rp 673,069.18
Rp 550.00 Rp 38,500.00
Rp 60,625.00 Rp 11,737.00
Rp 130,000.00 Rp 5,850.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 75,912.00
X Rp 632,597.47

Rp 60,625.00 Rp 9,427.19
Rp 130,000.00 Rp 2,600.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 34,902.19

Rp 60,625.00 Rp 6,280.75
Rp 130,000.00 Rp 3,120.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 975.00
Jumlah Rp 32,275.75
Rp 48,500.00 Rp 3,940.63
Rp 42,500.00 Rp 8,500.00
Rp 55,000.00 Rp 5,500.00
Rp 60,000.00 Rp 600.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 19,190.63

Rp 48,500.00 Rp 606.25
Rp 130,000.00 Rp 1,690.00
Rp 55,000.00 Rp 6,600.00
Jumlah Rp 8,896.25

Rp 35,000.00 Rp 7,000.00
Rp 7,000.00 Rp 3,500.00
Rp 5,000.00 Rp 5,000.00
Rp 5,000.00 Rp 5,000.00
Rp 35,000.00 Rp 17,500.00
Rp 47,000.00 Rp 9,400.00
Rp 10,200.00 Rp 8,537.40
Rp 15,000.00 Rp 3,000.00
Rp 1,250.00 Rp 1,250.00
Rp 1,250.00 Rp 781.25
Rp 42,500.00 Rp 3,187.50
Rp 55,000.00 Rp 4,950.00
Rp 60,000.00 Rp 540.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 71,271.15

Rp 5,000.00 Rp 2,500.00
Rp 11,220.00 Rp 7,405.20
Rp 2,500.00 Rp 85.00
Rp 55,000.00 Rp 48,400.00
Jumlah Rp 58,390.20

Rp 20,000.00 Rp 3,000.00
Rp 17,500.00 Rp 5,250.00
Rp 45,000.00 Rp 9,000.00
Rp 37,500.00 Rp 11,250.00
Rp 42,500.00 Rp 2,975.00
Rp 55,000.00 Rp 5,775.00
Rp 60,000.00 Rp 240.00
Rp 65,000.00 Rp 162.50
Jumlah Rp 37,652.50

Rp 35,000.00 Rp 6,300.00
Rp 5,600.00 Rp 672.00
Rp 42,500.00 Rp 1,190.00
Rp 55,000.00 Rp 2,310.00
Rp 60,000.00 Rp 252.00
Rp 65,000.00 Rp 1,625.00
Jumlah Rp 12,349.00

Rp 15,000.00 Rp 1,500.00
Rp 5,000.00 Rp 2,500.00
Rp 42,500.00 Rp 850.00
Rp 55,000.00 Rp 1,650.00
Rp 60,000.00 Rp 180.00
Rp 65,000.00 Rp 65.00
Jumlah Rp 6,745.00

Rp 6,745.00 Rp 6,745.00
Rp 12,349.00 Rp 12,349.00
Jumlah Rp 19,094.00

Rp 20,000.00 Rp 2,000.00
Rp 6,500.00 Rp 65.00
Rp 42,500.00 Rp 850.00
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 1,200.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 15,765.00

Rp 105,000.00 Rp 126,000.00
Rp 41,900.00 Rp 12,570.00
Rp 65,000.00 Rp 650.00
Jumlah Rp 139,220.00
Rp 43,100.00 Rp 46,043.73
Rp 60,625.00 Rp 11,882.50
Rp 130,000.00 Rp 5,850.00
Rp 9,000.00 Rp 11,700.00
Rp 42,500.00 Rp 29,750.00
Rp 55,000.00 Rp 19,250.00
Rp 60,000.00 Rp 2,100.00
Rp 65,000.00 Rp 2,275.00
Jumlah Rp 128,851.23

Rp 37,100.00 Rp 39,326.00
Rp 60,625.00 Rp 12,610.00
Rp 130,000.00 Rp 5,850.00
Rp 9,000.00 Rp 14,580.00
Rp 42,500.00 Rp 29,750.00
Rp 55,000.00 Rp 19,250.00
Rp 60,000.00 Rp 2,100.00
Rp 65,000.00 Rp 2,275.00
Jumlah Rp 125,741.00

Rp 37,100.00 Rp 38,955.00
Rp 60,625.00 Rp 11,276.25
Rp 130,000.00 Rp 2,340.00
Rp 9,000.00 Rp 17,460.00
Rp 42,500.00 Rp 38,250.00
Rp 55,000.00 Rp 24,750.00
Rp 60,000.00 Rp 2,700.00
Rp 65,000.00 Rp 2,925.00
Jumlah Rp 138,656.25

Rp 4,900.00 Rp 25,725.00
Rp 60,625.00 Rp 138.23
Rp 130,000.00 Rp 390.00
Rp 9,000.00 Rp 225.00
Rp 42,500.00 Rp 3,825.00
Rp 55,000.00 Rp 4,950.00
Rp 60,000.00 Rp 540.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 36,118.23

Rp 65,000.00 Rp 65,000.00
Rp 6,500,000.00 Rp 127,400.00
Rp 9,000.00 Rp 2,700.00
Rp 15,000.00 Rp 4,500.00
Rp 42,500.00 Rp 25,500.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 1,950.00
Jumlah Rp 349,050.00

Err:509 Err:509
Rp 42,500.00 Rp 637.50
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 52.00
Err:509

Rp 6,500,000.00 Rp 7,800,000.00
Rp 15,000.00 Rp 18,750.00
Rp 10,000.00 Rp 10,000.00
Rp 42,500.00 Rp 255,000.00
Rp 55,000.00 Rp 990,000.00
Rp 60,000.00 Rp 108,000.00
Rp 65,000.00 Rp 19,500.00
Jumlah Rp 9,201,250.00

Rp 6,500,000.00 Rp 156,000.00
Rp 10,000.00 Rp 3,000.00
Rp 42,500.00 Rp 34,000.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 2,600.00
Jumlah Rp 317,600.00
Rp 6,500,000.00 Rp 260,000.00
Rp 12,500.00 Rp 625.00
Rp 42,500.00 Rp 42,500.00
Rp 55,000.00 Rp 165,000.00
Rp 60,000.00 Rp 18,000.00
Rp 65,000.00 Rp 3,250.00
Jumlah Rp 489,375.00

Rp 70,000.00 Rp 77,000.00
Rp 42,500.00 Rp 637.50
Rp 55,000.00 Rp 8,250.00
Rp 60,000.00 Rp 900.00
Rp 65,000.00 Rp 52.00
Jumlah Rp 86,839.50

Rp 450,000.00 Rp 450,000.00
Rp 42,500.00 Rp 25,500.00
Rp 55,000.00 Rp 110,000.00
Rp 60,000.00 Rp 12,000.00
Rp 65,000.00 Rp 1,950.00
Jumlah Rp 599,450.00

Rp 15,000.00 Rp 150,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 20,000.00
Rp 350.00 Rp 350.00
Rp 750.00 Rp 750.00
Rp 10,000.00 Rp 10,000.00
Rp 42,500.00 Rp 12,750.00
Rp 55,000.00 Rp 27,500.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 230,850.00

Rp 17,500.00 Rp 17,500.00
Rp 15,000.00 Rp 150,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 5,000.00
Rp 750.00 Rp 750.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 193,792.50

Rp 45,000.00 Rp 45,000.00
Rp 15,000.00 Rp 225,000.00
Rp 6,500.00 Rp 6,500.00
Rp 5,000.00 Rp 50,000.00
Rp 350.00 Rp 2,100.00
Rp 750.00 Rp 1,500.00
Rp 42,500.00 Rp 42,500.00
Rp 55,000.00 Rp 55,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 430,600.00

Rp 32,000.00 Rp 32,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 46,042.50

Rp 35,000.00 Rp 35,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 49,042.50

Rp 45,000.00 Rp 45,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 59,042.50

Rp 15,000.00 Rp 15,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 29,042.50
Rp 25,000.00 Rp 25,000.00
Rp 42,500.00 Rp 42.50
Rp 55,000.00 Rp 11,000.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 39,042.50
Rp 5,500,000.00 Rp 5,500,000.00

Rp 684,500.00 Rp 684,500.00

Rp 40,000.00 Rp 520,000.00

Rp 978,000.00 Rp 978,000.00

Rp 19,500.00 Rp 117,000.00
Rp 150,000.00 Rp 150,000.00
Jumlah Rp 5,650,000.00

Rp 1,055,000.00 Rp 1,055,000.00
Rp 42,500.00 Rp 21,250.00
Rp 55,000.00 Rp 13,750.00
Rp 60,000.00 Rp 6,000.00
Jumlah Rp 1,096,000.00

Rp 800,000.00 Rp 800,000.00
Rp 25,000.00 Rp 100,000.00
Rp 42,500.00 Rp 38,250.00
Rp 55,000.00 Rp 24,750.00
Rp 60,000.00 Rp 15,000.00
Jumlah Rp 978,000.00

Rp 35,000.00 Rp 35,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 45,000.00
Rp 9,500.00 Rp 9,500.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 19,500.00

Rp 50,000.00 Rp 50,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 60,000.00

Rp 40,000.00 Rp 40,000.00
Rp 42,500.00 Rp 4,250.00
Rp 55,000.00 Rp 2,750.00
Rp 60,000.00 Rp 3,000.00
Jumlah Rp 50,000.00

Rp 65,000.00 Rp 13,000.00
Rp 62,500.00 Rp 75,000.00
Rp 60,000.00 Rp 720,000.00
Rp 60,000.00 Rp 240,000.00
Rp 6,500,000.00 Rp 7,150,000.00
Rp 12,000.00 Rp 180,000.00
Rp 27,100.00 Rp 151,760.00
Jumlah Rp 7,721,760.00

Rp 60,000.00 Rp 300.00
Rp 60,000.00 Rp 600.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 6,500,000.00 Rp 46,800.00
Rp 5,500,000.00 Rp 77,000.00
Rp 12,500.00 Rp 3,125.00
Jumlah Rp 132,825.00

Rp 65,000.00 Rp 325.00
Rp 62,500.00 Rp 625.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 6,500,000.00 Rp 46,800.00
Rp 12,000.00 Rp 168.00
Rp 12,500.00 Rp 3,125.00
Jumlah Rp 55,993.00

Rp 5,500.00 Rp 137,500.00
Rp 42,500.00 Rp 6,375.00
Rp 55,000.00 Rp 4,125.00
Rp 60,000.00 Rp 480.00
Rp 65,000.00 Rp 520.00
Jumlah Rp 149,000.00

Rp 65,000.00 Rp 325.00
Rp 62,500.00 Rp 625.00
Rp 60,000.00 Rp 6,000.00
Rp 59,000.00 Rp 5,900.00
Rp 5,500,000.00 Rp 39,600.00
Rp 65,000.00 Rp 16,250.00
Jumlah Rp 61,750.00

Rp 6,500.00 Rp 7,475.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 15,185.00

Rp 70,000.00 Rp 70,000.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 77,710.00

Rp 60,000.00 Rp 60,000.00
Rp 59,000.00 Rp 3,540.00
Rp 60,000.00 Rp 3,600.00
Rp 62,500.00 Rp 375.00
Rp 65,000.00 Rp 195.00
Jumlah Rp 67,710.00

Rp 16,500.00 Rp 90,750.00
Rp 27,000.00 Rp 59,400.00
Rp 7,650.00 Rp 7,650.00
Rp 59,000.00 Rp 23,600.00
Rp 60,000.00 Rp 6,000.00
Rp 62,500.00 Rp 625.00
Rp 65,000.00 Rp 325.00
Jumlah Rp 188,350.00

Rp 3,000.00 Rp 75,000.00
Rp 59,000.00 Rp 8,850.00
Rp 60,000.00 Rp 4,500.00
Rp 62,500.00 Rp 500.00
Rp 65,000.00 Rp 520.00
Jumlah Rp 89,370.00

Rp 81,250.00 Rp 243,750.00
Rp 17,500.00 Rp 2,800.00
Rp 11,500.00 Rp 371.45
Rp 59,000.00 Rp 23,600.00
Rp 60,000.00 Rp 12,000.00
Rp 62,500.00 Rp 1,250.00
Rp 65,000.00 Rp 130.00
Jumlah Rp 283,901.45
Rp 65,000.00 Rp 877.50
Rp 62,500.00 Rp 2,500.00
Rp 60,000.00 Rp 24,000.00
Rp 59,000.00 Rp 15,930.00
Rp 5,500,000.00 Rp 126,500.00
Rp 40,300.00 Rp 15,717.00
Rp 17,500.00 Rp 1,050.00
Jumlah Rp 159,197.00

Rp 9,000.00 Rp 9,000.00
Rp 30,000.00 Rp 30,000.00
Rp 11,000.00 Rp 550.00
Rp 59,000.00 Rp 8,850.00
Rp 60,000.00 Rp 15,000.00
Rp 62,500.00 Rp 1,562.50
Rp 65,000.00 Rp 4,875.00
Jumlah Rp 30,287.50
ANALISA VOLUME

KEGIATAN : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah Daerah
PEKERJAAN : Rehabilitasi UPTD Asrama Bibit Unggul
LOKASI : Villa Kalijudan Indah XV Kav. 2-4 Surabaya

No. JENIS PEKERJAAN SATUAN VOLUME LUAS PANJANG LEBAR TINGGI

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Mobilisasi dan Demobilisasi Ls 1.00
2 Bongkaran penutup atap gedung existing + rangka m2 488.70
3 Bongkaran plafon. m2 488.70
4 Pembuatan Direksi kit ls 1.00
5 Pembuatan Bowplang m2 42.31 42.31
6 Pembersihan Lapangan Ringan m2 488.70
B PEKERJAAN GEDUNG RUANG KERJA/KANTOR
I Pekerjaan Kusen Pintu dan Jendela
1 Kusen Alumunium 4' M1 128.96 128.96
2 Pasang kaca Rayben 5 mm M2 28.70 4.10
3 Engsel jendela Set 21.00
4 Engsel Pintu Set 5.00
5 Kunci pintu+handel Set 7.00
6 Grendel Jendela Bh 21.00
7 Slimar Alumunium M1 27.36 27.36
8 Pas. Pintu HDF Singgle Bh 7.00

II Pekerjaan Pengecatan
1 Pengecatan plafon M2 488.70 488.70
2 Pengecatan Listplang M2 16.46 54.86 0.3
3 Pengecatan Genteng M2 214.24
4 Pengecatan Dinding M2 273.84
III Pekerjaan Instalasi Listrik
1 Instalasi lampu Titik 42.00

IV Pekerjaan Atap Baja Komposit


1 Kuda kuda WF 150 x 100 x 6 x 9 Kg 893.59 42.35
2 Gording C 150 x 65 x 20 X 3,2 Kg 638.89 132.55
3 Plat penyambung WF Kg 255.96 12.00
4 Plat plendes t. = 10 mm Kg 25.48 0.02
5 Plat penahan gording besi siku 70 x 70 x 7 mm Kg 259.04 0.65
6 Reng/Usuk Galvalume M2 214.24 214.24
7 Baut HTB Ø16 mm Bh 392.00
8 Baut Angkur Ø19 mm Bh 56.00
9 Genteng Beton M2 42.85 214.24
10 Bubungan Beton M1 42.35 42.35
11 Pas. Besi Track Stang Ø 16mm Kg 200.49 127.70
12 Pas. Besi Penghubung gording Ø 10mm Kg 114.96 187.6
13 Listplank woodplank 3/30/400 M3 54.86 54.86
14 Track Stang Bh 15.00
15 Plat Stifner 8 mm Kg 127 0.01
16 Perakitan Baja Kg 1,941.27
17 Pengelasan Baja Kg 1,941.27

V Pekerjaan Plafond
1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow M2 198.02 198.02
2 List Plafon gypsum M1 168.00 168.00

VI Pekerjaan Talang
1 Pemasangan Talang M1 26.80

C. PEKERJAAN ATAP AULA


I Pekerjaan Atap Baja Galvalum
1 Reng/Usuk Galvalume M2 848.03 848.03
2 Genteng beton M2 169.61 848.03
3 Bubungan beton M1 81.60
4 Listplank woodplank 3/30/400 M3 200.52

II Pekerjaan Kusen dan Jendela


1 Kusen Alumunium 4' M1 257.92 257.916
2 Pasang kaca rayben 5 mm M2 44.61 44.61 0.64 0.98
3 Engsel jendela Bh 48.00
4 Grendel Jendela Bh 24.00
5 Slimar Alumunium M1 126.59 126.592
6 Engsel Pintu Set 4.00
7 Kunci pintu+handel Set 4.00

III Pekerjaan Plafond


1 Pemasangan Plafond Kalsiboard t = 4 mm Rangka hollow M2 804.11 804.11
2 List Plafon gypsum M1 165.20 165.20

IV Pekerjaan Pengecatan
1 Pengecatan Plafon M2 804.11 804.11
2 Pengecatan lisplang M2 60.16 60.16 200.52 0.30
3 Pengecatan dinding M2 820.00 820.00 82.00 5.00
4 Pengecatan Genteng M2 848.03 848.03

V Pekerjaan Lantai
1 Pemasangan Lantai Granit M2 544.79 34.70 15.70
2 Urugan pasir bawah lantai t = 10 cm M3 54.48 0.10

D. PEKERJAAN GUDANG
I Pekerjaan Tanah dan Pondasi
1 Pekerjaan galian tanah M3 47.8023 46.5003 1.65 1.65 1.22
1.302 43.4 0.15 0.2
2 Urugan pasir M3 3.8115 0.27225 1.65 1.65 0.1
3 Pemasangan batu kali belah kosong (aanstamping) M3 2.8 0.2 1 1 0.2
4 Pemasangan batu kali belah 15/20 cm (1 Pc : 4 Ps ) M3 9.072 0.648
5 Pengurugan Kembali M3 32.1188

II Pekerjaan Struktur dan Beton


1 Sloof 15 X 20 M3 1.302 43.4 0.15 0.2
2 Beton rabat lantai t = 5 cm M3 3.805875 3.359625 13.175 5.1 0.05
0.44625 1.75 5.1 0.05
3 Kolom 20 x 20 cm M3 1.584 0.132 0.2 0.2 3.3
4 Balok 20 x 15 cm M3 1.302 43.4 0.15 0.2
5 Kolom praktis 15 x 15 cm M3 0.1485 0.07425 0.15 0.15 3.3

III Pekerjaan Pasangan dan Plesteran


1 Batu merah 1 PC : 3 Psr. M3 16.4475 36.55 0.15 3
2 Plesteran 1 PC : 4 Psr. M2 200.9196 36.0366 3
3 Acian M2 200.9196
4 Benangan M1 36.0366

IV Pekerjaan Lantai dan Keramik


1 Urugan pasir bawah lantai t = 10 cm M3 7.61175 13.175 5.1 0.1
1.75 5.1 0.1
2 Pasang keramik Ruangan ( 30 x 30 cm) motuf/warna M2 76.1175

V Pekerjaan Kusen Pintu dan Jendela


1 Kusen Alumunium 4' M1 149.56
2 Pasang kaca Rayben 5 mm M2 9.84
3 Engsel jendela Set 2.00
4 Engsel Pintu Set 3.00
5 Kunci pintu+handel Set 3.00
6 Grendel Jendela Bh 2.00
7 Slimar Alumunium M1 31.76
VI Pekerjaan Pengecatan
1 Pengecatan plafon M2 166.97 23.03 7.25
2 Pengecatan Listplang M2 18.17 60.56 0.30
3 Pengecatan Genteng M2 183.30
4 Pengecatan Dinding M2 219.30 109.65 36.55 3.00

VII Pekerjaan Instalasi Listrik


1 Instalasi lampu Titik 16.00
2 Pemasangan Titik stop kontak gedung ( titik ) Titik 4.00
3 Pemasangan Saklar Ganda ( titik ) Titik 4.00

VIII Pekerjaan Atap Baja Komposit


1 Kuda kuda WF 150 x 100 x 6 x 9 Kg 2,389.15 113.23
2 Gording C 150 x 65 x 20 X 3,2 Kg 936.04 194.20
3 Plat penyambung WF Kg 383.94 18.00
4 Plat plendes t. = 10 mm Kg 51.78 0.04
5 Plat penahan gording besi siku 70 x 70 x 7 mm Kg 64.94 8.80 0.10
6 Reng/Usuk Galvalume M2 183.30
7 Baut HTB Ø16 mm Bh 464.00
8 Baut Angkur Ø19 mm Bh 64.00
9 Genteng Beton M2 183.30
10 Bubungan Beton M1 37.20
11 Pas. Besi Track Stang Ø 16mm Kg 118.85 75.70
12 Pas. Besi Penghubung gording Ø 10mm Kg 61.74
13 Listplank woodplank 3/30/400 M3 60.20
14 Track Stang Bh 31.00
15 Plat Stifner 8 mm Kg 182 0.01
16 Perakitan Baja Kg 3,942.84
17 Pengelasan Baja Kg 3,942.84

IX Pekerjaan Plafond
1 Pemasangan Plafond Eternit Rangka hollow M2 166.97
2 List Plafon gypsum M1 183.25

E. PEKERJAAN TEMPAT WUDLU


I Pekerjaan Lantai
1 Pek. Urugan Sirtu Lokal/Songsong m3 21.31 38.75 0.55
2 Rabat Baton t 5cm m3 1.94 38.75 0.05
3 Pas. Kramik Tegel 30x30 m2 16.60 16.60
4 Pas. Kramik Tegel 20x20 m2 22.05 22.05
5 Pas. Bata Dudukan Wudlu m2 2.36 11.80 0.20

II Pekerjaan Pintu
1 Pas. Pintu WPC Singgle Bh 2.00

III Pekerjaan Pengecatan


1 Pengecatan plafon M2 38.75
2 Pengecatan Listplang M2 25.00
3 Pengecatan Genteng M2 38.72 38.72
4 Pengecatan Dinding M2 158.40 158.40

IV Pekerjaan Instalasi Listrik


1 Instalasi lampu Titik 6.00

V Pekerjaan Atap Baja Komposit


1 Kuda kuda WF 150 x 100 x 6 x 9 Kg 408.50 19.36
2 Gording C 150 x 65 x 20 X 3,2 Kg 243.70 50.56
3 Plat penyambung WF Kg 127.98 6.00
4 Plat plendes t. = 10 mm Kg 12.94 0.04
5 Plat penahan gording besi siku 70 x 70 x 7 mm Kg 243.70
6 Reng/Usuk Galvalume M2 38.72
7 Baut HTB Ø16 mm Bh 92.00
8 Baut Angkur Ø19 mm Bh 16.00
9 Genteng Beton M2 38.72
10 Bubungan Beton M1 19.36
11 Pas. Besi Track Stang Ø 16mm Kg 17.60
12 Pas. Besi Penghubung gording Ø 10mm Kg 6.37 10.40
13 Listplank woodplank 3/30/400 M3 24.90
14 Track Stang Bh 2.00
15 Plat Stifner 8 mm Kg 11.37 0.01
16 Perakitan Baja Kg 804.49
17 Pengelasan Baja Kg 804.49

VI Pekerjaan Plafond
1 Pemasangan Plafond Eternit Rangka hollow M2 38.70
2 List Plafon gypsum M1 33.80

VII Pekerjaan Pasangan dan Plesteran


1 Batu merah 1 PC : 3 Psr. M3 13.20 26.40 0.50
2 Plesteran 1 PC : 4 Psr. M2 3.96 52.80 0.15 0.50
3 Acian M2 3.96
4 Benangan M1 52.80

VIII Pekerjaan Struktur dan Beton


1 Kolom 20 x 20 cm M3 0.02 0.04 0.50

IX Pekerjaan Sanitair
1 Pipa pembuang air wudlu dan kamar mandi m1 7.60
2 Pek. WC Duduk Bh 2.00
3 Kran Air Bh 12.00
4 Pipa Air Bersih m1 21.40
5 Pas. Avour Bh 4.00

F PEKERJAAN CANNOPY TEMPAT JEMURAN


1 Pas. Atap pollycarbonate Tb. 6 mm m2 88.40 13.60 6.50
2 Kolom pipa Ø 10 cm m1 25.08 2.85
3 Besi Hollow 50 x 50 Lonjor 72.30 394.34
4 Rabat beton m3 4.08 13.60 6.00 0.05
5 Beton Pondasi m3 1.29
6 Pekerjaan pengelasan Kg 1,090.57
7 Pekerjaan Perakitan Kg 1,090.57
8 Pekerjaan galian m3 0.77
9 Pekerjaan pengecatan m2 94.62

G PEKERJAAN CANNOPY MENUJU GUDANG


1 Pas. Atap pollycarbonate Tb. 6 mm m2 48.64 19.30 1.26
2 Kolom pipa Ø 10 cm Lonjor 7.45 2.902
3 Besi Hollow 30 x 30 Tb. 1.2 mm Lonjor 40.07 218.54
4 Rabat beton m3 2.41 19.30 2.50 0.05
5 Beton Pondasi m3 0.69
6 Pekerjaan pengelasan Kg 583.10
7 Pekerjaan Perakitan Kg 583.10
8 Pekerjaan galian m3 0.76
9 Pekerjaan pengecatan m2 30.90

H PEKERJAAN PAVING
A. PAVING LAPANGAN SEPAK BOLA
1 Pek. Pebersihan Paving lama m2 314.64 20.70 15.20
2 Pas. Paving K-350 Tb. 8 Cm m2 292.42
3 Pas. Topi Uskup K-350 Tb. 8 Cm m2 8.14 69.60
4 Pas. Strecher k-350 Tb. 8 Cm m2 14.08 70.40 0.20
5 Pas. Kanstin K-175 m1 71.20 71.20
6 Urugan Sirtu m3 31.46 20.70 15.20 0.10
7 Pasir Pasang m3 15.73 20.70 15.20 0.05

B. PAVING LAPANGAN BERMAIN


Luas Lahan m2 184.06 174.66 14.20 12.30
9.40 2.00 4.70
1 Pas. Paving K-350 Tb. 8 Cm m2 166.68
2 Pas. Topi Uskup K-350 Tb. 8 Cm m2 6.34 54.22
3 Pas. Strecher k-350 Tb. 8 Cm m2 11.04 55.20 0.20
4 Pas. Kanstin K-175 m1 65.50 65.50
5 Urugan Sirtu m3 18.41 184.06 0.10
6 Pasir Pasang m3 9.20 184.06 0.05

C. PAVING LAPANGAN DEPAN MASJID


Luas lahan m2 622.50

1 Pas. Paving K-350 Tb. 8 Cm m2 586.94


2 Pas. Topi Uskup K-350 Tb. 8 Cm m2 12.91 110.41
3 Pas. Strecher k-350 Tb. 8 Cm m2 22.65 113.26 0.20
4 Pas. Kanstin K-175 m1 113.26 113.26
5 Urugan Sirtu m3 62.25 622.50 0.10
6 Pasir Pasang m3 31.13 622.50 0.05

I PEKERJAAN TERALIS SEKOLAH


1 Besi plat strip 3mm x 19 mm x 6 m kg 612.33 1370.88
2 Pekerjaan Pengelasan kg 612.33
3 Pekerjaan perakitan baja kg 612.33

J PEKERJAAN PAGAR KAMAR TIDUR


1 Hollow 40 x 60 x 6 m tb 1,4 mm Lonjor 4.14 22.56
2 Hollow 40 x 40 x 6 m tb 1,2 mm Lonjor 16.47 89.82
3 Hollow 100 x 50 x 6 m tb 1,7 mm Lonjor 2.93 16.00
4 Pekerjaan Pengelasan kg 271.37
5 Pekerjaan perakitan baja kg 271.37

K PEKERJAAN TERALIS GEDUNG KAMAR TIDUR


1 Hollow 40 x 60 x 6 m tb 1,4 mm Lonjor 10.01 54.58
2 Hollow 40 x 40 x 6 m tb 1,2 mm Lonjor 17.45 95.20
4 Pekerjaan Pengelasan kg 287.04
5 Pekerjaan perakitan baja kg 287.04

L PEKERJAAN PINTU DAN JENDELA


1 Kusen Alumunium 4' M1 78.42 78.42
3 Pekerjaan jendela nako m2 4.16 0.69 0.70 0.99
4 Engsel Pintu Set 10.00
5 Kunci pintu+handel Set 20.00
6 Pas. Pintu Allumunium dengan teralis Bh 10.00
7 Pas. Pintu Allumunium Bh 10.00

M PEKERJAAN AKHIR
1 Air kerja Ls 1.00
2 Pembersihan Akhir Ls 1.00
DIAMETER JUMLAH BERAT

7
21
5

21
21.1
4.82
21.33
14 80.903
54 7.38

1.570
0.61

224 64.72
48
48
24

2.00

14
14
14
14
14

12

2
2.00

21.1
4.82
21.33
16.00 80.903
88.00 7.38

1.570
0.61

320.00 64.72
21.1
4.82
21.33
4.00 80.903
7.38
1.57
0.6128

20.00 64.722222
8.00 19.8/lnjr
13.94/lnjr

2.00
14.00 12.8/lnjr
6.61/lnjr
2.68

13.18
8.89
24.02

13.18
8.89

6.00
Nama Kegiatan : Pembangunan/Rehabilitasi dan Pengawasan Fasilitas Gedung Pemerintah dan Pemerintah
Nama Pekerjaan : Rehabilitasi UPTD Asrama Bibit Unggul
Lokasi Pekerjaan : Villa Kalijudan Indah XV Kav. 2-4 Surabaya

BOBOT BULAN I
NO URAIAN PEKERJAAN (%) MINGGU KE
1

A. PEKERJAAN PERSIAPAN
1 Pekerjaan Persiapan Mobilisasi dan Demobilisasi 0.036 0.036
2 Bongkaran penutup atap gedung existing + rangka 0.213 0.213
3 Bongkaran plafon. 0.213 0.213
4 Pembuatan Bowplang 0.175 0.175
5 Pembersihan Lapangan Ringan 0.107 0.107

B. PEKERJAAN GEDUNG RUANG KERJA/KANTOR


1 Pekerjaan Kusen, Pintu dan Jendela 2.175 0.218
2 Pekerjaan Pengecatan 1.473 0.147
3 Pekerjaan Instalasi Listrik 0.481 0.048
4 Pekerjaan Atap Baja Komposit 7.035 0.704
5 Pekerjaan Plafond 2.188 0.219
6 Pekerjaan Talang 0.213 0.021

C. PEKERJAAN AULA
1 Pekerjaan Atap Baja Galvalum 14.988
2 Pekerjaan Kusen, Pintu dan Jendela 3.335
3 Pekerjaan Plafon 8.109
4 Pekerjaan Pengecatan 3.711
5 Pekerjaan Lantai 14.719

D PEKERJAAN GUDANG
1 Pekerjaan Tanah dan Pondasi 0.663
2 Pekerjaan Struktur dan Beton 2.031
3 Pekerjaan Pasangan dan Plesteran 1.020
4 Pekerjaan Lantai dan Keramik 0.846
5 Pekerjaan Kusen Pintu dan Jendela 1.484
6 Pekerjaan Pengecatan 0.862
7 Pekerjaan Instalasi Listrik 0.281
8 Pekerjaan Atap Baja Komposit 10.326
9 Pekerjaan Plafond 1.908

E. PEKERJAAN TEMPAT WUDLU


1 Pekerjaan Lantai 0.706
2 Pekerjaan Pintu 0.144
3 Pekerjaan Pengecatan 0.392
4 Pekerjaan Instalasi Listrik 0.084
5 Pekerjaan Atap Baja Komposit 2.535
6 Pekerjaan Plafond 0.429
7 Pekerjaan Pasangan dan Plesteran 0.145
8 Pekerjaan Struktur dan Beton 0.010
9 Pekerjaan Sanitair 0.351

F PEKERJAAN CANNOPY TEMPAT JEMURAN 2.586

PEKERJAAN CANNOPY MENUJU GUDANG 0.996

H PEKERJAAN PAVING
1 A. PAVING LAPANGAN SEPAK BOLA 2.593
2 B. PAVING LAPANGAN BERMAIN 1.625
3 C. PAVING LAPANGAN DEPAN MASJID 4.798

PEKERJAAN TERALIS SEKOLAH 0.721

I PEKERJAAN PAGAR KAMAR TIDUR 0.194


J PEKERJAAN TERALIS GEDUNG KAMAR TIDUR 0.265

K PEKERJAAN PINTU DAN JENDELA 2.688

L PEKERJAAN AKHIR 0.144

Rencana ( Ra ) 100.00 2.101


Komulatif Rencana 100.00 2.101
PROGRES RENCANA PEKERJAAN
dung Pemerintah dan Pemerintah Daerah

BULAN I BULAN II BULAN III


MINGGU KE MINGGU KE MINGGU KE
2 3 4 5 6 7 8 9 10

0.544 0.761 0.653


0.368 0.516 0.442
0.120 0.168 0.144
1.759 2.462 2.111
0.547 0.766 0.657
0.053 0.074 0.064

2.998 2.998 2.998 2.998 2.998


0.667 0.667 0.667 0.667 0.667
1.622 1.622 1.622 1.622 1.622
0.742 0.742 0.742 0.742 0.742
2.944 2.944 2.944 2.944 2.944
0.000 0.000 0.000 0.000 0.000

0.066 0.099 0.133 0.133 0.133


0.203 0.305 0.406 0.406 0.406
0.102 0.153 0.204 0.204 0.204
0.085 0.127 0.169 0.169 0.169
0.148 0.223 0.297 0.297 0.297
0.086 0.129 0.172 0.172 0.172
0.028 0.042 0.056 0.056 0.056
1.033 1.549 2.065 2.065 2.065
0.191 0.286 0.382 0.382 0.382

0.212
0.043
0.118
0.025
0.761
0.129
0.043
0.003
0.105
3.391 4.748 4.070 8.973 10.915 11.886 12.857 12.857 5.323
5.492 10.240 14.309 23.282 34.197 46.083 58.939 71.796 77.119
BULAN III BULAN III
MINGGU KE MINGGU KE KET
11 12 13 14 15 16

0.744
100%
13.565

75%

44.863

0.099
0.305
0.153 50%
0.127
0.223
0.129
0.042
1.549
0.286 19.421

0.282 0.212
0.058 0.043
0.157 0.118
0.034 0.025
1.014 0.761
0.172 0.129
0.058 0.043 25%
0.004 0.003
0.141 0.105 4.796

0.776 1.810 2.586

0.697 0.299

1.685 0.907
1.138 0.488
1.200 1.440 2.159 9.016

0.721

0.194 0.194
0.265 0.265

2.688 2.688

0.144 0% 0.144

4.832 4.770 3.796 3.584 3.067 2.832


81.951 86.721 90.517 94.101 97.168 100.000
Luas Tulangan Total dalam mm2
Ø
1 2 3

6 28 57 85
8 50 101 151
10 79 157 236
12 113 226 339
14 154 308 462
16 201 402 603
19 284 567 851
20 314 629 943
22 380 761 1141
25 491 982 1473
28 616 1232 1848
32 805 1609 2414

Luas batang tulangan dalam mm2 per meter lebar plat


JARAK DIAMET
( mm ) 6 8 10

50 566 1006 1571


75 377 670 1048
100 283 503 486
125 226 402 629
150 189 335 524
175 162 287 449
200 141 251 393
225 126 223 349
250 113 201 314
275 103 183 286
300 94 168 262

Luas batang tulangan Sengkang


JARAK DIAMETER TULANGAN SEN
( mm ) 6 8 10

50 1131 2011 3143


75 754 1341 2095
100 566 1006 1571
125 453 805 1257
150 377 670 1048
175 323 575 898
200 283 503 786
225 251 447 698
250 226 402 629
275 206 366 571
300 189 335 524

Berat dan Luas Tulangan /m' an kelipantannya


Luas Berat
Ø
mm2 kg/m' 2

6 28 0.22 0.44
8 50 0.39 0.78
10 79 0.61 1.23
12 113 0.88 1.77
14 154 1.20 2.40
16 201 1.57 3.14
19 284 2.21 4.42
20 314 2.45 4.90
22 380 2.97 5.93
25 491 3.83 7.66
28 616 4.80 9.61
32 805 6.28 12.55

RUMUS MENCARI BEBAN BESI POLOS DENGAN KOEF.


Luas Berat
Ø
mm2 kg/m' 2
BESI Ø 6 0.22 0.44
BESI Ø 8 0.39 0.78
BESI Ø 10 0.61 1.23
BESI Ø 12 0.88 1.76
BESI Ø 13 1.04 2.07
BESI Ø 14 1.20 2.40
BESI Ø 16 1.57 3.14
BESI Ø 19 2.21 4.42
BESI Ø 20 2.45 4.90
BESI Ø 22 2.97 5.93
BESI Ø 25 3.83 7.66
BESI Ø 28 4.80 9.61
BESI Ø 32 6.28 12.55

RUMUS MENCARI BEBAN BESI DEFORM DENGAN KOEF


Luas Berat
D
mm2 KG / LJR 1
BESI D 6 2.99 0.25
BESI D 8 0.00
BESI D 10 7.40 0.62
BESI D 12 0.00
BESI D 13 12.48 1.04
BESI D 14 0.00
BESI D 16 18.96 1.58
BESI D 19 26.76 2.23
BESI D 20 0.00
BESI D 22 35.76 2.98
BESI D 25 0.00
BESI D 28 0.00
BESI D 32 0.00

BESI PLAT t = 10 MM

ITEM SATUAN
BESI PLAT t = 10 MM 1 LBR

LUAS M2 BOBOT KG M2(KG)


2.880 233.000 80.903
P L LUAS M2 BOBOT KG
1.20 2.40 2.88 233.00
0.30 0.40 0.12 9.71

LUAS M2 BOBOT KG CM2(KG)


28800.000 233.000 0.008
10 MM
P ( CM ) L ( CM ) LUAS CM2 BOBOT KG
1.000 1.000 1.000 0.008
12.000 24.000 288.000 2.330
100.000 100.000 10000 80.903

PERBANDINGAN

BESI BETON POLOS POKOK KOLO


BESI BETON POLOS POKOK KOLO
BESI BETON POLOS POKOK KOLO
BESI BETON POLOS BEGEL KOLO
ITEM
BESI BETON POLOS Ø 16 MM
BESI BETON POLOS Ø 12 MM
BESI BETON POLOS Ø 8 MM
BESI BETON POLOS Ø 8 MM

ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 8
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

BESI BETON POLOS POKOK KOLO


BESI BETON POLOS BEGEL KOLO
ITEM
BESI BETON POLOS Ø 10 MM
BESI BETON POLOS Ø 10 MM

ITEM
KOLOM / BALOK 0.08 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

BESI BETON POLOS POKOK PONDA


BESI BETON POLOS BEGEL PONDA
ITEM
BESI BETON POLOS Ø MM
BESI BETON POLOS Ø MM
ITEM JARI 2
STROS 0.2
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

POOR c
P L T
PLAT 1 2 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0

POOR a dan b
P L T
PLAT 1 1 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0

SLOOF1
ITEM
KOLOM / BALOK 0.25 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 0.60

K1
P L T VOLUME M3 / M1
0.2 0.2 1.00 0.04
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.58 8 316.00
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.125 0.3

kp
P L T VOLUME M3 / M1
0.12 0.12 1.00 0.01
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.39 4 108.94
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.22 0.15 0.14

BT 6
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.50

bl
P L T VOLUME M3 / M1
0.12 0.2 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 4 147.07
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14

BT1
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.50

BT2
ITEM
KOLOM / BALOK 0.2 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.30

BT3
ITEM
KOLOM / BALOK 0.35 0.7
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 2.00
BT4
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.50

BT5
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.20
BT6
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.00
HAK X (2) P METER / BH
0.10 1.50
BT7
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.20

BT8
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 3
JUMLAH BESI TUL POKOK( LAJUR ) 2
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.20
BT9
ITEM
KOLOM / BALOK 0.3 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.88
HAK X (2) P METER / BH
0.10 1.50
BT10
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.20
BG
ITEM
KOLOM / BALOK 0.15 0.2
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.60

plat lantai t-12 cm


P L T
PLAT 1 1 0.12
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.2 2
0.61 0.025 0.2 2
0.00 0 0 0

plat lantai t-8 cm


P L T
PLAT 1 1 0.08
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 1
0.61 0.025 0.15 1
0.00 0 0 0

plat tangga t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0
plat tandon t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0

k5
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 62.75
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k6
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k7
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 78.44
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k15/20 12 8-150 septiktank


P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 6 176.49
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.2

KT 10 10-100
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 6 114.90
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.1 0.06

BB1 D19/12 10-60/10-150


ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
BB2
ITEM
KOLOM / BALOK 0.3 0.45
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40

BB3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90

BB4
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10

B1
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60

B1A
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B2
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10

B4
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B5
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B6
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.20
B7
ITEM
KOLOM / BALOK 0.25 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40
B8
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B9
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B10
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B11
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.60
B12 D 13 8-150
ITEM
KOLOM / BALOK 0.15 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.80
B BORDES D 13 8-150
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 8
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90

BL 10 8-150
P L T VOLUME M3 / M1
0.12 0.15 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 136.18
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14

BK1 D22 10-150


P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 2.98 10 238.40
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.15 0.4

PLAT 12 10-100 10-200


P L T
PLAT 1 1 0.12
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.39 0.025 0.15 2
0.00 0 0 0

PLAT 8 10-100 10-150


P L T
PLAT 1 0.65 0.08
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.1 1
0.61 0.025 0.15 1
0.00 0 0 0

PLAT TG D13-150 8-150


P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.04 0.025 0.15 2
0.39 0.025 0.15 2
0.00 0 0 0

PLAT st 1 12-150
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 1
0.88 0.025 0.15 1
0.00 0 0 0

PLAT st 1 12-150 12-15


P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 2
0.88 0.025 0.15 2
0.00 0 0 0
JUMLAH BATANG TULANGAN
4 5 6 7

113 141 170 198


201 251 302 352
314 393 471 550
453 566 679 792
616 770 924 1078
805 1006 1207 1408
1135 1418 1702 1986
1257 1571 1886 2200
1521 1901 2282 2662
1964 2455 2946 3438
2464 3080 3696 4312
3218 4023 4827 5632

DIAMETER TULANGAN PLAT ( mm )


12 14 16 19

2263 3080 4023 5673


1509 2053 2682 3782
1131 1540 2011 2836
905 1232 1609 2269
754 1027 1341 1891
647 880 1149 1621
566 770 1006 1418
503 684 894 1261
453 616 805 1135
411 560 731 1031
377 513 670 945

DIAMETER TULANGAN SENGKANG / BEGEL ( mm )


12 14 16 19

4526 6160 8046 11346


3017 4107 5364 7564
2263 3080 4023 5673
1810 2464 3218 4538
1509 2053 2682 3782
1293 1760 2299 3242
1131 1540 2011 2836
1006 1369 1788 2521
905 1232 1609 2269
823 1120 1463 2063
754 1027 1341 1891

Berat ( kg ) untuk panjang ( m )


3 4 5 6

0.66 0.88 1.10 1.32


1.18 1.57 1.96 2.35
1.84 2.45 3.06 3.68
2.65 3.53 4.41 5.30
3.60 4.80 6.01 7.21
4.71 6.28 7.84 9.41
6.64 8.85 11.06 13.27
7.35 9.81 12.26 14.71
8.90 11.86 14.83 17.80
11.49 15.32 19.15 22.98
14.41 19.22 24.02 28.83
18.83 25.10 31.38 37.65

LOS DENGAN KOEF. BESI 0.0078064 Kg/CM3


Berat ( kg ) untuk panjang ( m )
3 4 5 6
0.66 0.88 1.10 1.32
1.18 1.57 1.96 2.35
1.84 2.45 3.06 3.68
2.65 3.53 4.41 5.29
3.11 4.14 5.18 6.21
3.60 4.80 6.01 7.21
4.71 6.28 7.84 9.41
6.64 8.85 11.06 13.27
7.35 9.80 12.26 14.71
8.90 11.86 14.83 17.80
11.49 15.32 19.15 22.98
14.41 19.22 24.02 28.83
18.83 25.10 31.38 37.65

FORM DENGAN KOEF. BESI Kg/CM3


Berat ( kg ) untuk panjang ( m )
2 3 4 5
0.50 0.75 1.00 1.25
0.00 0.00 0.00 0.00
1.23 1.85 2.47 3.08
0.00 0.00 0.00 0.00
2.08 3.12 4.16 5.20
0.00 0.00 0.00 0.00
3.16 4.74 6.32 7.90
4.46 6.69 8.92 11.15
0.00 0.00 0.00 0.00
5.96 8.94 11.92 14.90
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

ESI PLAT t = 10 MM

BOTOT ( KG)/LEMBAR LUAS SATUAN


233.00 2.88 M2

SATUAN
KG
KG

TEBAL PLAT BESI DALAM MM


1 2 3 4
BOBOT KG BOBOT KG BOBOT KG BOBOT KG
0.001 0.002 0.002 0.003
0.233 0.466 0.6990 0.932
8.090 16.181 24.271 32.361

PERBANDINGAN

POLOS POKOK KOLOM / BALOK Ø 16 MM


POLOS POKOK KOLOM / BALOK Ø 12 MM
POLOS POKOK KOLOM / BALOK Ø 8 MM
POLOS BEGEL KOLOM / BALOK Ø 8 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
12 1.57 12.00 METER
12 0.88 12.00 METER
12 12.00 METER
12 0.39 12.00 METER

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR VOLUME KG / M3
5 130.73
2 29.41
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.15 0.35 0.55 0.10
JUMLAH BEGEL / M3 VOLUME KG / M3
112.11 43.97

+ BEGEL ) 0.2 0.3 204.1141


224.5256

POLOS POKOK KOLOM / BALOK Ø 10 MM


POLOS BEGEL KOLOM / BALOK Ø 10 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
12 0.61 12.00 METER
12 0.61 12.00 METER

P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
JULMAH LJR VOLUME KG / M3
6 114.90
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.1 0.11 0.75 0.10

+ BEGEL ) 0.08 0.4 299.3283


329.2611

POLOS POKOK PONDASI STROS Ø 10 MM


POLOS BEGEL PONDASI STROS Ø 6 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
0.88 12.00 METER
0.39 12.00 METER
KOEF T VOLUME M3 / M1 P METER / M3
3.14 1.00 0.13 7.96
JULMAH LJR VOLUME KG / M3
8 56.21
JARAK - BEGEL (2X3.14X(r - 0.025) ) HAK X (2) P METER / BH
0.15 1.10 0.10 1.20

+ BEGEL ) 0.2 81.6357 KG


89.7992 ples 10%

VOLUME M3 / M2 P M2 / M3
0.60 1.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20.00 0.025 1.225 64.52
40.00 0.025 2.225 234.37
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.30 3.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20 0.025 1.225 129.03
20 0.025 1.225 129.03
0 0 0 0.00

P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 316.00
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.2 0.30
JUMLAH BEGEL / M3 VOLUME KG / M3 386.4020
191.48 70.40 425.0422

P METER / M3 402.2210 KG
25.00 442.4431 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.30 0.10 0.70 201.00

P METER / M3 147.8367 KG
69.44 162.6204 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.14 0.10 0.38 463.96

P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 52.67
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 138.4515
54.33 71.92 152.2967

P METER / M3 206.1126 KG
41.67 226.7238 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.30 0.10 0.54 278.78

P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
8.5 1.58 89.53
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 134.9592
34.33 31.56 148.4551

P L T VOLUME M3 / M1
0.2 0.5 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 63.20
2 1.04 20.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.3 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 130.3189
58.14 46.32 143.3508

P L T VOLUME M3 / M1
0.35 0.7 1.00 0.25
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
13 2.23 118.33
4 1.04 16.98
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.6 1.30
JUMLAH BEGEL / M3 VOLUME KG / M3 178.2340
24.32 42.93 196.0574
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 68.47
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1125 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 137.7236
60.26 55.39 151.4960

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 79.00
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 164.7724
81.00 85.77 181.2496

P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 52.67
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 66.5333
39.10 0.00 73.1867

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 71.10
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.175 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 113.8559
58.14 42.76 125.2415

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.04 52.00
1.04 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1375 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 130.0712
73.73 78.07 143.0783
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
8 2.23 118.93
2 1.04 13.87
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1375 0.5 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 198.3005
49.48 65.50 218.1306

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 79.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1125 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 145.1007
89.89 66.10 159.6108

P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 0.88 117.66
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.30
JUMLAH BEGEL / M3 VOLUME KG / M3 170.1852
223.22 52.53 187.2037

VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10.00 0.025 1.045 53.36
10.00 0.025 1.045 53.36
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.08 12.50
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.67 0.025 1.005 51.32
6.67 0.025 1.005 51.32
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 84.32
13.33 0.025 1.075 58.56
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 58.56
13.33 0.025 1.075 58.56
0 0 0 0.00

P METER / M3 82.9486 KG
6.67 91.2435 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.90 0.10 1.50 34.33

P METER / M3 128.9832 KG
11.11 141.8816 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.50 0.10 1.10 56.56

P METER / M3 100.1920 KG
8.33 110.2112 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.70 0.10 1.30 42.67

P METER / M3 229.0140 KG
33.33 251.9154 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.30 0.10 0.60 223.22

P METER / M3 280.1170 KG
31.25 308.1287 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.70 0.10 0.86 313.50

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 2.23 133.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.115 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 203.3857
58.97 57.82 223.7242
P L T VOLUME M3 / M1
0.3 0.45 1.00 0.14
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 70.22
2 0.88 13.07
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.5 0.80
JUMLAH BEGEL / M3 VOLUME KG / M3 120.8187
68.34 37.52 132.9006

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 152.7493
134.33 47.42 168.0243

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11.5 2.23 170.97
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.105 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 245.9656
64.49 63.23 270.5622

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11 2.23 163.53
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 235.7026
61.61 60.40 259.2729
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 88.88
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 160.3912
114.64 49.46 176.4303

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 217.1818
167.67 59.18 238.9000

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 144.9055
112.11 39.57 159.3961

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 102.70
2 0.88 17.65
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 163.6039
91.91 43.26 179.9642

P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7.5 1.58 94.80
2 0.88 14.12
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 149.4003
73.73 40.48 164.3403

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5.5 1.58 144.83
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 192.2493
134.33 47.42 211.4743

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7 1.58 138.25
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.07 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 237.7799
179.57 77.47 261.5579

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 131.67
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 190.8484
167.67 59.18 209.9333

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 1.58 94.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 145.2240
61.61 38.66 159.7464

P L T VOLUME M3 / M1
0.15 0.3 1.00 0.05
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.04 92.44
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 139.2402
149.15 46.80 153.1642

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 205.4160
134.33 47.42 225.9576

P METER / M3 200.2631 KG
55.56 220.2894 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.20 0.10 0.44 371.37

P METER / M3 285.0137 KG
8.00 313.5150 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.90 0.10 1.40 54.33

VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.045 71.15
13.3333333333 0.025 1.045 45.54
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.05 19.23
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10 0.025 1.005 118.44
4.3333333333 0.025 0.655 33.45
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 99.38
13.3333333333 0.025 1.075 37.48
0 0 0 0.00
VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.6666666667 0.025 1.075 42.16
6.6666666667 0.025 1.075 42.16
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 84.32
13.3333333333 0.025 1.075 84.32
0 0 0 0.00
8 9 10

226 255 283


402 453 503
629 707 786
905 1018 1131
1232 1386 1540
1609 1810 2011
2269 2553 2836
2514 2829 3143
3042 3423 3803
3929 4420 4911
4928 5544 6160
6437 7241 8046

20 22

6286 7606
4190 5070
3143 3803
2514 3042
2095 2535
1796 2173
1571 1901
1397 1690
1257 1521
1143 1383
1048 1268

20

12571
8381
6286
5029
4190
3592
3143
2794
2514
2286
2095

g(m)
7 8 9

1.54 1.77 1.99


2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.70
26.81 30.64 34.47
33.63 38.44 43.24
43.93 50.21 56.48

0.00786
untuk panjang ( m )
7 8 9
1.54 1.76 1.99
2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
7.25 8.29 9.32
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.69
26.81 30.64 34.47
33.63 38.43 43.24
43.93 50.20 56.48

erat ( kg ) untuk panjang ( m )


6 7 8
1.50 1.74 1.99
0.00 0.00 0.00
3.70 4.32 4.93
0.00 0.00 0.00
6.24 7.28 8.32
0.00 0.00 0.00
9.48 11.06 12.64
13.38 15.61 17.84
0.00 0.00 0.00
17.88 20.86 23.84
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

TEBAL PLAT BESI DALAM MM


5 6 7
BOBOT KG BOBOT KG BOBOT KG
0.004 0.005 0.006
1.165 1.398 1.631
40.451 48.542 56.632

GUGUR
LULUS

P METER / M3
16.67

P METER / BH
1.00

KG
ples 10%

P METER / M3
31.25

P METER / BH JUMLAH BEGEL / M3 VOL KG / M3


0.96 313.50 184.43

KG
ples 10%
JUMLAH BEGEL / M3 VOLUME KG / M3
54.08 25.43

179.3300 KG TIAP SATU UK.


298.8833 KG TIAP (M3)
328.7717 plus 10 %

77.4200 KG TIAP SATU UK.


258.0667 KG TIAP (M3)
283.8733 plus 10 %

P METER / M3
33.33

KG
ples 10%

VOL KG / M3
86.22

VOL KG / M3
38.89

P METER / M3
6.67

KG
ples 10%

VOL KG / M3
59.04

P METER / M3
6.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
4.08

KG
ples 10%
P METER / M3
6.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
6.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
10.00

KG
ples 10%
P METER / M3
6.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
33.33

KG
ples 10%

12.8075 KG TIAP SATU UK.


106.7293 KG TIAP (M3)
117.4023 plus 10 %

8.2115 KG TIAP SATU UK.


102.6440 KG TIAP (M3)
112.9084 plus 10 %

21.4317 KG TIAP SATU UK.


142.8777 KG TIAP (M3)
157.1655 plus 10 %
17.5669 KG TIAP SATU UK.
117.1129 KG TIAP (M3)
128.8242 plus 10 %

VOL KG / M3
20.20

11.6085

VOL KG / M3
24.40

12.0230

VOL KG / M3
21.75

VOL KG / M3
52.53

VOL KG / M3
165.22

P METER / M3
6.67

KG
ples 10%
P METER / M3
7.41

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
6.67

KG
ples 10%

P METER / M3
6.67

KG
ples 10%
P METER / M3
12.50

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
8.00

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
6.67

KG
ples 10%

P METER / M3
22.22
KG
ples 10%

P METER / M3
16.67

KG
ples 10%

VOL KG / M3
64.09

VOL KG / M3
46.61

14.0029 KG TIAP SATU UK.


116.6907 KG TIAP (M3)
128.3598 plus 10 %

7.8980 KG TIAP SATU UK.


151.8841 KG TIAP (M3)
167.0725 plus 10 %

20.5281 KG TIAP SATU UK.


136.8539 KG TIAP (M3)
150.5393 plus 10 %
12.6482 KG TIAP SATU UK.
84.3213 KG TIAP (M3)
92.7534 plus 10 %

25.2964 KG TIAP SATU UK.


168.6426 KG TIAP (M3)
185.5068 plus 10 %
Luas Tulangan Total dalam mm2
Ø
1 2 3

6 28 57 85
8 50 101 151
10 79 157 236
12 113 226 339
14 154 308 462
16 201 402 603
19 284 567 851
20 314 629 943
22 380 761 1141
25 491 982 1473
28 616 1232 1848
32 805 1609 2414

Luas batang tulangan dalam mm2 per meter lebar plat


JARAK DIAMET
( mm ) 6 8 10

50 566 1006 1571


75 377 670 1048
100 283 503 486
125 226 402 629
150 189 335 524
175 162 287 449
200 141 251 393
225 126 223 349
250 113 201 314
275 103 183 286
300 94 168 262

Luas batang tulangan Sengkang


JARAK DIAMETER TULANGAN SEN
( mm ) 6 8 10

50 1131 2011 3143


75 754 1341 2095
100 566 1006 1571
125 453 805 1257
150 377 670 1048
175 323 575 898
200 283 503 786
225 251 447 698
250 226 402 629
275 206 366 571
300 189 335 524

Berat dan Luas Tulangan /m' an kelipantannya


Luas Berat
Ø
mm2 kg/m' 2

6 28 0.22 0.44
8 50 0.39 0.78
10 79 0.61 1.23
12 113 0.88 1.77
14 154 1.20 2.40
16 201 1.57 3.14
19 284 2.21 4.42
20 314 2.45 4.90
22 380 2.97 5.93
25 491 3.83 7.66
28 616 4.80 9.61
32 805 6.28 12.55

RUMUS MENCARI BEBAN BESI POLOS DENGAN KOEF.


Luas Berat
Ø
mm2 kg/m' 2
BESI Ø 6 0.22 0.44
BESI Ø 8 0.39 0.78
BESI Ø 10 0.61 1.23
BESI Ø 12 0.88 1.76
BESI Ø 13 1.04 2.07
BESI Ø 14 1.20 2.40
BESI Ø 16 1.57 3.14
BESI Ø 19 2.21 4.42
BESI Ø 20 2.45 4.90
BESI Ø 22 2.97 5.93
BESI Ø 25 3.83 7.66
BESI Ø 28 4.80 9.61
BESI Ø 32 6.28 12.55

RUMUS MENCARI BEBAN BESI DEFORM DENGAN KOEF


Luas Berat
D
mm2 KG / LJR 1
BESI D 6 2.99 0.25
BESI D 8 0.00
BESI D 10 7.40 0.62
BESI D 12 0.00
BESI D 13 12.48 1.04
BESI D 14 0.00
BESI D 16 18.96 1.58
BESI D 19 26.76 2.23
BESI D 20 0.00
BESI D 22 35.76 2.98
BESI D 25 0.00
BESI D 28 0.00
BESI D 32 0.00

BESI PLAT t = 10 MM

ITEM SATUAN
BESI PLAT t = 10 MM 1 LBR

LUAS M2 BOBOT KG M2(KG)


2.880 233.000 80.903
P L LUAS M2 BOBOT KG
1.20 2.40 2.88 233.00
0.30 0.40 0.12 9.71

LUAS M2 BOBOT KG CM2(KG)


28800.000 233.000 0.008
10 MM
P ( CM ) L ( CM ) LUAS CM2 BOBOT KG
1.000 1.000 1.000 0.008
12.000 24.000 288.000 2.330
100.000 100.000 10000 80.903

PERBANDINGAN

BESI BETON POLOS POKOK KOLO


BESI BETON POLOS POKOK KOLO
BESI BETON POLOS POKOK KOLO
BESI BETON POLOS BEGEL KOLO
ITEM
BESI BETON POLOS Ø 16 MM
BESI BETON POLOS Ø 12 MM
BESI BETON POLOS Ø 8 MM
BESI BETON POLOS Ø 8 MM

ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 8
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

BESI BETON POLOS POKOK KOLO


BESI BETON POLOS BEGEL KOLO
ITEM
BESI BETON POLOS Ø 10 MM
BESI BETON POLOS Ø 10 MM

ITEM
KOLOM / BALOK 0.08 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

BESI BETON POLOS POKOK PONDA


BESI BETON POLOS BEGEL PONDA
ITEM
BESI BETON POLOS Ø MM
BESI BETON POLOS Ø MM
ITEM JARI 2
STROS 0.15
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
ITEM
JUMLAH BESI TUL BEGEL ( BUAH )

TOTAL PEMBESIAN KOLO / BALOK ( BESI POKOK + BEGEL )

POOR 1
P L T
PLAT 1.2 1.2 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0

POOR 2
P L T
PLAT 0.8 0.8 0.3
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.58 0.025 0.1 2
1.58 0.025 0.1 2
0.00 0 0 0

SLOOF1
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
SLOOF2 dan 3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90

K1
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 10 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

K2
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 8 139.45
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

K3
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 8 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

kp
P L T VOLUME M3 / M1
0.12 0.12 1.00 0.01
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 170.22
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14

b tangga = b4
P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 4.5 117.66
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.3

bl
P L T VOLUME M3 / M1
0.12 0.2 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 4 147.07
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14

b2 dan b3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
b1
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70
b5
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70
KS1
ITEM
KOLOM / BALOK 0.3 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.70

plat lantai t-12 cm


P L T
PLAT 1 1 0.12
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.2 2
0.61 0.025 0.2 2
0.00 0 0 0

plat lantai t-8 cm


P L T
PLAT 1 1 0.08
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 1
0.61 0.025 0.15 1
0.00 0 0 0

plat tangga t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.1 2
0.61 0.025 0.1 2
0.00 0 0 0
plat tandon t= 15 cm
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.61 0.025 0.15 2
0.00 0 0 0

k5
P L T VOLUME M3 / M1
0.3 0.5 1.00 0.15
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 62.75
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k6
P L T VOLUME M3 / M1
0.3 0.3 1.00 0.09
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 104.58
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k7
P L T VOLUME M3 / M1
0.3 0.4 1.00 0.12
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 1.57 6 78.44
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.2 0.5

k15/20 12 8-150 septiktank


P L T VOLUME M3 / M1
0.15 0.2 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.88 6 176.49
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.2

KT 10 10-100
P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 6 114.90
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.1 0.06

BB1 D19/12 10-60/10-150


ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60

BB2
ITEM
KOLOM / BALOK 0.3 0.45
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40

BB3
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90

BB4
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
JUMLAH BESI TUL POKOK( LAJUR )
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10

B1
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60

B1A
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.61
HAK X (2) P METER / BH
0.10 1.60
B2
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B3
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10

B4
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B5
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B6
ITEM
KOLOM / BALOK 0.25 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.20
B7
ITEM
KOLOM / BALOK 0.25 0.5
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.40
B8
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B9
ITEM
KOLOM / BALOK 0.2 0.4
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.10
B10
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90
B11
ITEM
KOLOM / BALOK 0.25 0.6
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 16
JUMLAH BESI TUL POKOK( LAJUR ) 12
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 1.60
B12 D 13 8-150
ITEM
KOLOM / BALOK 0.15 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 0
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.80
B BORDES D 13 8-150
ITEM
KOLOM / BALOK 0.2 0.3
ITEM
JUMLAH BESI TUL POKOK( LAJUR ) 13
JUMLAH BESI TUL POKOK( LAJUR ) 8
JUMLAH BESI TUL POKOK( LAJUR ) 0
ITEM BOTOT ( KG)/M1
JUMLAH BESI TUL BEGEL ( BUAH ) 0.39
HAK X (2) P METER / BH
0.10 0.90

BL 10 8-150
P L T VOLUME M3 / M1
0.12 0.15 1.00 0.02
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 0.61 4 136.18
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.39 0.15 0.14

BK1 D22 10-150


P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
ITEM BOTOT ( KG)/M1 JULMAH LJR VOL KG / M3
TUL POKOK 2.98 10 238.40
ITEM JARAK - BEGEL P X 2 - 0,05
TUL BEGEL 0.61 0.15 0.4

PLAT 12 10-100 10-200


P L T
PLAT 1 1 0.12
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.15 2
0.39 0.025 0.15 2
0.00 0 0 0

PLAT 8 10-100 10-150


P L T
PLAT 1 0.65 0.08
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.61 0.025 0.1 1
0.61 0.025 0.15 1
0.00 0 0 0

PLAT TG D13-150 8-150


P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
1.04 0.025 0.15 2
0.39 0.025 0.15 2
0.00 0 0 0

PLAT st 1 12-150
P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 1
0.88 0.025 0.15 1
0.00 0 0 0

PLAT st 1 12-150 12-15


P L T
PLAT 1 1 0.15
KG /M1 JARAK BESI & BETON JARAK- BESI DOBLE(2) / TIDAK(1)
0.88 0.025 0.15 2
0.88 0.025 0.15 2
0.00 0 0 0
JUMLAH BATANG TULANGAN
4 5 6 7

113 141 170 198


201 251 302 352
314 393 471 550
453 566 679 792
616 770 924 1078
805 1006 1207 1408
1135 1418 1702 1986
1257 1571 1886 2200
1521 1901 2282 2662
1964 2455 2946 3438
2464 3080 3696 4312
3218 4023 4827 5632

DIAMETER TULANGAN PLAT ( mm )


12 14 16 19

2263 3080 4023 5673


1509 2053 2682 3782
1131 1540 2011 2836
905 1232 1609 2269
754 1027 1341 1891
647 880 1149 1621
566 770 1006 1418
503 684 894 1261
453 616 805 1135
411 560 731 1031
377 513 670 945

DIAMETER TULANGAN SENGKANG / BEGEL ( mm )


12 14 16 19

4526 6160 8046 11346


3017 4107 5364 7564
2263 3080 4023 5673
1810 2464 3218 4538
1509 2053 2682 3782
1293 1760 2299 3242
1131 1540 2011 2836
1006 1369 1788 2521
905 1232 1609 2269
823 1120 1463 2063
754 1027 1341 1891

Berat ( kg ) untuk panjang ( m )


3 4 5 6

0.66 0.88 1.10 1.32


1.18 1.57 1.96 2.35
1.84 2.45 3.06 3.68
2.65 3.53 4.41 5.30
3.60 4.80 6.01 7.21
4.71 6.28 7.84 9.41
6.64 8.85 11.06 13.27
7.35 9.81 12.26 14.71
8.90 11.86 14.83 17.80
11.49 15.32 19.15 22.98
14.41 19.22 24.02 28.83
18.83 25.10 31.38 37.65

LOS DENGAN KOEF. BESI 0.0078064 Kg/CM3


Berat ( kg ) untuk panjang ( m )
3 4 5 6
0.66 0.88 1.10 1.32
1.18 1.57 1.96 2.35
1.84 2.45 3.06 3.68
2.65 3.53 4.41 5.29
3.11 4.14 5.18 6.21
3.60 4.80 6.01 7.21
4.71 6.28 7.84 9.41
6.64 8.85 11.06 13.27
7.35 9.80 12.26 14.71
8.90 11.86 14.83 17.80
11.49 15.32 19.15 22.98
14.41 19.22 24.02 28.83
18.83 25.10 31.38 37.65

FORM DENGAN KOEF. BESI Kg/CM3


Berat ( kg ) untuk panjang ( m )
2 3 4 5
0.50 0.75 1.00 1.25
0.00 0.00 0.00 0.00
1.23 1.85 2.47 3.08
0.00 0.00 0.00 0.00
2.08 3.12 4.16 5.20
0.00 0.00 0.00 0.00
3.16 4.74 6.32 7.90
4.46 6.69 8.92 11.15
0.00 0.00 0.00 0.00
5.96 8.94 11.92 14.90
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00

ESI PLAT t = 10 MM

BOTOT ( KG)/LEMBAR LUAS SATUAN


233.00 2.88 M2

SATUAN
KG
KG

TEBAL PLAT BESI DALAM MM


1 2 3 4
BOBOT KG BOBOT KG BOBOT KG BOBOT KG
0.001 0.002 0.002 0.003
0.233 0.466 0.6990 0.932
8.090 16.181 24.271 32.361

PERBANDINGAN

POLOS POKOK KOLOM / BALOK Ø 16 MM


POLOS POKOK KOLOM / BALOK Ø 12 MM
POLOS POKOK KOLOM / BALOK Ø 8 MM
POLOS BEGEL KOLOM / BALOK Ø 8 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
12 1.57 12.00 METER
12 0.88 12.00 METER
12 12.00 METER
12 0.39 12.00 METER

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR VOLUME KG / M3
5 130.73
2 29.41
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.15 0.35 0.55 0.10
JUMLAH BEGEL / M3 VOLUME KG / M3
112.11 43.97

+ BEGEL ) 0.2 0.3 204.1141


224.5256

POLOS POKOK KOLOM / BALOK Ø 10 MM


POLOS BEGEL KOLOM / BALOK Ø 10 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
12 0.61 12.00 METER
12 0.61 12.00 METER

P L T VOLUME M3 / M1
0.08 0.4 1.00 0.03
JULMAH LJR VOLUME KG / M3
6 114.90
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05 HAK X (2)
0.1 0.11 0.75 0.10

+ BEGEL ) 0.08 0.4 299.3283


329.2611

POLOS POKOK PONDASI STROS Ø 10 MM


POLOS BEGEL PONDASI STROS Ø 6 MM
SATUAN 1 LJR BOTOT ( KG)/M1 PNJANG SATUAN
0.88 12.00 METER
0.39 12.00 METER
KOEF T VOLUME M3 / M1 P METER / M3
3.14 1.00 0.07 14.15
JULMAH LJR VOLUME KG / M3
8 99.92
JARAK - BEGEL (2X3.14X(r - 0.025) ) HAK X (2) P METER / BH
0.15 0.79 0.10 0.89

+ BEGEL ) 0.15 133.0207 KG


146.3227 ples 10%

VOLUME M3 / M2 P M2 / M3
0.43 2.31
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
24.00 0.025 1.425 125.08
24.00 0.025 1.425 125.08
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.19 5.21
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
16 0.025 1.025 134.96
16 0.025 1.025 134.96
0 0 0 0.00

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.57 117.66
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 147.4250
84.33 29.77 162.1675

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 135.1007
84.33 29.77 148.6108

P METER / M3 124.7824 KG
6.67 137.2607 ples 10%
L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3
0.90 0.10 1.50 34.33

P METER / M3 163.8447 KG
11.11 180.2292 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.50 0.10 1.10 56.56

P METER / M3 126.3381 KG
8.33 138.9719 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.70 0.10 1.30 42.67

P METER / M3 239.3680 KG
69.44 263.3048 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.14 0.10 0.38 463.96

P METER / M3 147.4250 KG
16.67 162.1675 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.50 0.10 0.90 84.33

P METER / M3 206.1126 KG
41.67 226.7238 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.30 0.10 0.54 278.78

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.57 88.24
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 137.6986
63.50 27.39 151.4685

P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.57 52.29
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 81.2840
28.78 19.19 89.4124

P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
12 1.57 104.58
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 133.5762
28.78 19.19 146.9339

P L T VOLUME M3 / M1
0.3 0.6 1.00 0.18
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.57 52.29
2 0.88 9.80
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.2 0.5 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 81.2840
28.78 19.19 89.4124

VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10.00 0.025 1.045 53.36
10.00 0.025 1.045 53.36
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.08 12.50
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.67 0.025 1.005 51.32
6.67 0.025 1.005 51.32
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
20.00 0.025 1.075 87.83
20.00 0.025 1.075 87.83
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.33 0.025 1.075 58.56
13.33 0.025 1.075 58.56
0 0 0 0.00

P METER / M3 82.9486 KG
6.67 91.2435 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.90 0.10 1.50 34.33

P METER / M3 128.9832 KG
11.11 141.8816 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.50 0.10 1.10 56.56

P METER / M3 100.1920 KG
8.33 110.2112 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.70 0.10 1.30 42.67

P METER / M3 229.0140 KG
33.33 251.9154 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.30 0.10 0.60 223.22

P METER / M3 280.1170 KG
31.25 308.1287 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.70 0.10 0.86 313.50

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 2.23 133.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.115 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 203.3857
58.97 57.82 223.7242
P L T VOLUME M3 / M1
0.3 0.45 1.00 0.14
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 70.22
2 0.88 13.07
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.5 0.80
JUMLAH BEGEL / M3 VOLUME KG / M3 120.8187
68.34 37.52 132.9006

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.88 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 152.7493
134.33 47.42 168.0243

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11.5 2.23 170.97
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.105 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 245.9656
64.49 63.23 270.5622

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
11 2.23 163.53
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 235.7026
61.61 60.40 259.2729
P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 98.75
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 170.2662
114.64 49.46 187.2928

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4.5 1.58 88.88
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 160.3912
114.64 49.46 176.4303

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 217.1818
167.67 59.18 238.9000

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.58 105.33
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 144.9055
112.11 39.57 159.3961

P L T VOLUME M3 / M1
0.25 0.4 1.00 0.10
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6.5 1.58 102.70
2 0.88 17.65
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 163.6039
91.91 43.26 179.9642

P L T VOLUME M3 / M1
0.25 0.5 1.00 0.13
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7.5 1.58 94.80
2 0.88 14.12
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 0.90
JUMLAH BEGEL / M3 VOLUME KG / M3 149.4003
73.73 40.48 164.3403

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5.5 1.58 144.83
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 192.2493
134.33 47.42 211.4743

P L T VOLUME M3 / M1
0.2 0.4 1.00 0.08
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
7 1.58 138.25
2 0.88 22.06
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.07 0.3 0.70
JUMLAH BEGEL / M3 VOLUME KG / M3 237.7799
179.57 77.47 261.5579

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
5 1.58 131.67
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.1 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 190.8484
167.67 59.18 209.9333

P L T VOLUME M3 / M1
0.25 0.6 1.00 0.15
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
9 1.58 94.80
2 0.88 11.77
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.11 0.4 1.10
JUMLAH BEGEL / M3 VOLUME KG / M3 145.2240
61.61 38.66 159.7464

P L T VOLUME M3 / M1
0.15 0.3 1.00 0.05
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
4 1.04 92.44
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.15 0.2 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 139.2402
149.15 46.80 153.1642

P L T VOLUME M3 / M1
0.2 0.3 1.00 0.06
JULMAH LJR BOTOT ( KG)/M1 VOLUME KG / M3
6 1.58 158.00
0 0.00 0.00
0 0.00
JARAK - BEGEL P X 2 - 0,05 L X 2 - 0,05
0.125 0.3 0.50
JUMLAH BEGEL / M3 VOLUME KG / M3 205.4160
134.33 47.42 225.9576

P METER / M3 200.2631 KG
55.56 220.2894 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.20 0.10 0.44 371.37

P METER / M3 285.0137 KG
8.00 313.5150 ples 10%

L X 2 - 0,05 HAK X (2) P METER / BH JML BEGEL / M3


0.90 0.10 1.40 54.33

VOLUME M3 / M2 P M2 / M3
0.12 8.33
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.045 71.15
13.3333333333 0.025 1.045 45.54
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.05 19.23
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
10 0.025 1.005 118.44
4.3333333333 0.025 0.655 33.45
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 99.38
13.3333333333 0.025 1.075 37.48
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
6.6666666667 0.025 1.075 42.16
6.6666666667 0.025 1.075 42.16
0 0 0 0.00

VOLUME M3 / M2 P M2 / M3
0.15 6.67
JUMLAH LJR HAK p besi / (1/2 lilitan ) VOL KG / M3
13.3333333333 0.025 1.075 84.32
13.3333333333 0.025 1.075 84.32
0 0 0 0.00
8 9 10

226 255 283


402 453 503
629 707 786
905 1018 1131
1232 1386 1540
1609 1810 2011
2269 2553 2836
2514 2829 3143
3042 3423 3803
3929 4420 4911
4928 5544 6160
6437 7241 8046

20 22

6286 7606
4190 5070
3143 3803
2514 3042
2095 2535
1796 2173
1571 1901
1397 1690
1257 1521
1143 1383
1048 1268

20

12571
8381
6286
5029
4190
3592
3143
2794
2514
2286
2095

g(m)
7 8 9

1.54 1.77 1.99


2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.70
26.81 30.64 34.47
33.63 38.44 43.24
43.93 50.21 56.48

0.00786
untuk panjang ( m )
7 8 9
1.54 1.76 1.99
2.75 3.14 3.53
4.29 4.90 5.52
6.18 7.06 7.94
7.25 8.29 9.32
8.41 9.61 10.81
10.98 12.55 14.12
15.49 17.70 19.91
17.16 19.61 22.06
20.76 23.73 26.69
26.81 30.64 34.47
33.63 38.43 43.24
43.93 50.20 56.48

erat ( kg ) untuk panjang ( m )


6 7 8
1.50 1.74 1.99
0.00 0.00 0.00
3.70 4.32 4.93
0.00 0.00 0.00
6.24 7.28 8.32
0.00 0.00 0.00
9.48 11.06 12.64
13.38 15.61 17.84
0.00 0.00 0.00
17.88 20.86 23.84
0.00 0.00 0.00
0.00 0.00 0.00
0.00 0.00 0.00

TEBAL PLAT BESI DALAM MM


5 6 7
BOBOT KG BOBOT KG BOBOT KG
0.004 0.005 0.006
1.165 1.398 1.631
40.451 48.542 56.632

GUGUR
LULUS

0.1307306667

P METER / M3
16.67

P METER / BH
1.00

KG
ples 10%

P METER / M3
31.25

P METER / BH JUMLAH BEGEL / M3 VOL KG / M3


0.96 313.50 184.43

KG
ples 10%
JUMLAH BEGEL / M3 VOLUME KG / M3
95.36 33.10

108.0720 KG TIAP SATU UK.


250.1667 KG TIAP (M3)
275.1833 plus 10 %

51.8240 KG TIAP SATU UK.


269.9167 KG TIAP (M3)
296.9083 plus 10 %

P METER / M3
16.67

KG
ples 10%

P METER / M3
16.67

KG
ples 10%
VOL KG / M3
20.20

VOL KG / M3
24.40

VOL KG / M3
21.75

VOL KG / M3
69.15

VOL KG / M3
29.77

VOL KG / M3
59.04

P METER / M3
12.50

KG
ples 10%

P METER / M3
5.56
KG
ples 10%

P METER / M3
5.56

KG
ples 10%

P METER / M3
5.56

KG
ples 10%

12.8075 KG TIAP SATU UK.


106.7293 KG TIAP (M3)
117.4023 plus 10 %

8.2115 KG TIAP SATU UK.


102.6440 KG TIAP (M3)
112.9084 plus 10 %

26.3504 KG TIAP SATU UK.


175.6693 KG TIAP (M3)
193.2363 plus 10 %
17.5669 KG TIAP SATU UK.
117.1129 KG TIAP (M3)
128.8242 plus 10 %

VOL KG / M3
20.20

11.6085

VOL KG / M3
24.40

12.0230

VOL KG / M3
21.75

VOL KG / M3
52.53

VOL KG / M3
165.22

P METER / M3
6.67

KG
ples 10%
P METER / M3
7.41

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
6.67

KG
ples 10%

P METER / M3
6.67

KG
ples 10%
P METER / M3
12.50

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
10.00

KG
ples 10%

P METER / M3
8.00
KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
12.50

KG
ples 10%

P METER / M3
16.67

KG
ples 10%

P METER / M3
6.67

KG
ples 10%

P METER / M3
22.22
KG
ples 10%

P METER / M3
16.67

KG
ples 10%

VOL KG / M3
64.09

VOL KG / M3
46.61

14.0029 KG TIAP SATU UK.


116.6907 KG TIAP (M3)
128.3598 plus 10 %

7.8980 KG TIAP SATU UK.


151.8841 KG TIAP (M3)
167.0725 plus 10 %

20.5281 KG TIAP SATU UK.


136.8539 KG TIAP (M3)
150.5393 plus 10 %
12.6482 KG TIAP SATU UK.
84.3213 KG TIAP (M3)
92.7534 plus 10 %

25.2964 KG TIAP SATU UK.


168.6426 KG TIAP (M3)
185.5068 plus 10 %

Anda mungkin juga menyukai