Anda di halaman 1dari 635

HAL.

INPUT (TIDAK DI PRINT)

● PEMERINTAH DAERAH = PEMERINTAH KABUPATEN BANGGAI KEPULAUAN


● DAERAH = KABUPATEN BANGGAI KEPULAUAN
● INSTANSI / SKPD = DINAS KESEHATAN KAB. BANGGAI KEPULAUAN
= DINAS KESEHATAN
JALAN TRANS PELING KM 5 NO. 1 KEC. TINANGKUNG - SAL
● ALAMAT =

● KEPALA DINAS = DIREKTUR RUMAH SAKIT UMUM DAERAH TRIKORA SALAKA


NAMA KADIS =
NIP KADIS =
● PPK DINAS = PEJABAT PEMBUAT KOMITMEN (PPK)
NAMA PPK = Dr. ANDI FATRIANI PATSYAR, M.Kes
NIP PPK = NIP. 19810125 200902 2 009
● PPTK = PEJABAT PELAKSANA TEKNIS KEGIATAN (PPTK)
NAMA PPTK = MUHAMMAD SALIM, SKM
NIP PPTK = NIP. 19771104 200012 1 003
PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK U
● PROGRAM =
PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PR
● KEGIATAN =
● SUB KEGIATAN =
PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
● PEKERJAAN =
● LOKASI = RSUD TRIKORA SALAKAN
● SUMBER DANA = DAK
● TAHUN ANGGARAN = 2022
= TAHUN ANGGARAN 2022
● WAKTU PELAKSANAAN = WAKTU PELAKSANAAN 120 (SERATUS DUA PULUH) HARI K

● PERIHAL = ENGINEERING ESTIMATE ( EE )


● TEMPAT & TGL EE = SALAKAN, MEI 2022
● BIDANG JASA = KONSULTAN PERENCANA
● PERUSAHAAN = CV. KAUTSAR Engineering Consul
● NAMA DIREKTUR = MUHAMMAD TRIMUKTI, ST
● JABATAN = Direktur
● OVER HEAD & PROVIT = 10%
● NO. KODE ANALISA = RSL
KEPULAUAN

PULAUAN
. TINANGKUNG - SALAKAN

RAH TRIKORA SALAKAN

AN (PPTK)

KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH KABUPATEN/KOTA


ERTA SARANA DAN PRASARANA PENDUKUNGNYA

TRIKORA SALAKAN

Pembang
DUA PULUH) HARI KALENDER unan
Tribun
Lapangan
Upacara
Kawasan
Perkantor
an Bukit
Halimun

Engineering Consultant
PEMERINTAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN
JALAN TRANS PELING KM 5 NO. 1 KEC. TINANGKUNG - SALAKAN

ENGINEERING ESTIMATE ( EE )

PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK


PROGRAM :
UKM DAN UKP KEWENANGAN DAERAH KABUPATEN/KOTA

PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN


KEGIATAN :
PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :

LOKASI : RSUD TRIKORA SALAKAN

TAHUN ANGGARAN : 2 0 2 2

KONSULTAN PERENCANA
PEMERINTAH KABUPATEN BANGGAI KEPULAUAN
DINAS KESEHATAN
JALAN TRANS PELING KM 5 NO. 1 KEC. TINANGKUNG - SALAKAN

SPESIFIKASI TEKNIS

PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK


PROGRAM : UKM DAN UKP KEWENANGAN DAERAH KABUPATEN/KOTA

PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN


KEGIATAN : PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :

LOKASI : RSUD TRIKORA SALAKAN

TAHUN ANGGARAN : 2 0 2 2
REKAPITULASI TOTAL
PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH
PROGRAM : KABUPATEN/KOTA

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA


PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN Rp 28,616,099.42

II PEKERJAAN TANAH DAN PASIR Rp 15,071,573.79

III PEKERJAAN PASANGAN DAN PELESTERAN Rp 334,193,349.62

IV PEKERJAAN STRUKTUR BETON Rp 249,778,437.64

V PEKERJAAN BESI DAN ALUMUNIUM Rp 309,131,627.09

VI PEKERJAAN KAYU Rp 58,385,201.79

VII PEKERJAAN INSTALASI LISTRIK Rp 29,371,100.00

VIII PEKERJAAN SANITASI DAN PIPA Rp 40,463,343.59

IX PEKERJAAN PENGECATAN Rp 23,787,592.86

X PEKERJAAN AKHIR Rp 5,805,000.00

A REAL COST Rp 1,094,603,325.79

B PPn ( 11% x A ) Rp 120,406,365.84

C JUMLAH TOTAL ( A + B ) Rp 1,215,009,691.63

D PEMBULATAN Rp 1,215,000,000.00

TERBILANG :
SATU MILIAR DUA RATUS LIMA BELAS JUTA RUPIAH

SALAKAN, MEI 2022


MENGETAHUI : DIBUAT OLEH :
DIREKTUR RUMAH SAKIT UMUM DAERAH TRIKORA SALAKAN CV. KAUTSAR
SELAKU PEJABAT PEMBUAT KOMITMEN (PPK) Engineering Consultant

Dr. ANDI FATRIANI PATSYAR, M.Kes MUHAMMAD TRIMUKTI, ST


NIP. 19810125 200902 2 009 Direktur
1,094,603,325.79 2.6143 %

1,094,603,325.79 1.3769 %

1,094,603,325.79 30.5310 %

1,094,603,325.79 22.8191 %

1,094,603,325.79 28.2414 %

1,094,603,325.79 5.3339 %

1,094,603,325.79 2.6833 %

1,094,603,325.79 3.6966 %

1,094,603,325.79 2.1732 %

1,094,603,325.79 0.5303 %

100.0000 %

PAGU 1,215,000,000.00

SISA -
ENGINEERING ESTIMATE ( EE )
PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH
PROGRAM : KABUPATEN/KOTA

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA


PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022

NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH HARGA

I PEKERJAAN PERSIAPAN

1 Pek. Mobilisasi dan Demobilisasi Ls 1.00 Rp. 6,390,000.00 Rp. 6,390,000.00


2 Perlengkapan K3 dan Penanganan Covid 19 Ls 1.00 Rp. 10,755,000.00 Rp. 10,755,000.00
3 Pek. Pengukuran dan Pemasangan Bouwplank M1 161.50 Rp. 67,713.80 Rp. 10,935,778.70
4 Pek. Pembuatan Bak Adukan Bh 2.00 Rp. 140,481.00 Rp. 280,962.00
5 Pek. Papan Nama Proyek M2 0.96 Rp. 264,957.00 Rp. 254,358.72
JUMLAH I Rp 28,616,099.42

II PEKERJAAN TANAH DAN PASIR

1 Pek. Galian Pondasi Batu Kali, Panjang 161,50 m M3 38.76 Rp. 85,816.50 Rp. 3,326,247.54
2 Pek. Urugan Kembali Galian Batu Kali, Panjang 161,50 m M3 2.42 Rp. 61,633.00 Rp. 149,151.86
3 Pek. Urugan Tanah Bawah Lantai M3 72.30 Rp. 93,120.50 Rp. 6,732,612.15
4 Pek. Urugan Pasir Bawah Lantai M3 12.72 Rp. 276,810.60 Rp. 3,521,030.83
5 Urugan Pasir Bawah Pondasi Batu Kali, Panjang 161,50 m M3 4.85 Rp. 276,810.60 Rp. 1,342,531.41
JUMLAH II Rp 15,071,573.79

III PEKERJAAN PASANGAN DAN PELESTERAN

1 Pek. Pondasi Batu Kosong, Panjang 161,50 m M3 24.23 Rp. 628,849.98 Rp. 15,237,035.02
2 Pek. Pondasi Batu Kali, Camp. 1 : 4, Panjang 161,50 m M3 30.28 Rp. 1,188,320.10 Rp. 35,982,332.63
3 Pek. Dinding Batu Bata 1/2 Bt 1 : 5 cm M2 455.92 Rp. 163,759.97 Rp. 74,661,445.52
4 Pek. Lantai Granit 60 x 60 Cm, Polished M2 225.92 Rp. 273,795.17 Rp. 61,855,804.81
5 Pek. Lantai Granit 60 x 60 Cm, UnPolished M2 7.30 Rp. 296,215.92 Rp. 2,162,376.22
6 Pek. Plint Granit 10 x 60 Cm M1 213.05 Rp. 100,194.05 Rp. 21,346,342.35
7 Pek. Step Nosing Granit 30 x 60 Cm, UnPolished M2 8.55 Rp. 223,263.54 Rp. 1,908,903.22
8 Pek. Pas. Lantai Toilet Keramik 30 x 30 Cm Kasar M2 7.29 Rp. 199,628.13 Rp. 1,455,289.07
9 Pek. Pas. Dinding Keramik Km/Wc 30 x 30 x 210 Cm, Polished M2 38.64 Rp. 174,701.13 Rp. 6,750,451.66
10 Pek. Pelesteran Dinding dan Pondasi, Camp. 1 : 5 Tebal 15 mm M2 873.20 Rp. 80,485.42 Rp. 70,279,865.25
11 Pek. Acian Dinding dan Pondasi M2 888.32 Rp. 47,903.35 Rp. 42,553,503.87
JUMLAH III Rp 334,193,349.62

IV PEKERJAAN STRUKTUR BETON

1 Pek. Sloof Type 1, 15/20


- Pembesian 4 Ø 12" Kg 573.65 Rp. 18,168.11 Rp. 10,422,137.30
- Besi Beugel Ø 8" - 15 Kg 289.19 Rp. 19,398.92 Rp. 5,609,974.87
- Bekisting Papan 3 Kali Pakai M2 21.53 Rp. 212,663.66 Rp. 4,578,648.60
- Cor Beton K250 M3 3.29 Rp. 1,443,067.90 Rp. 4,747,693.40
- Pelesteran 1 : 5 Tebal 15 mm (Bagian Luar) M2 13.00 Rp. 80,485.42 Rp. 1,046,310.41
- Acian (Bagian Luar) M2 13.00 Rp. 47,903.35 Rp. 622,743.55
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 13.00 Rp. 26,778.18 Rp. 348,116.34
2 Pek. Kolom Type 1, 25/25
- Pembesian 6 Ø 12" Kg 504.03 Rp. 18,168.11 Rp. 9,157,273.36
- Besi Beugel Ø 8" - 15 Kg 244.13 Rp. 19,398.92 Rp. 4,735,859.35
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 31.53 Rp. 353,275.78 Rp. 11,138,785.34
- Cor Beton K250 M3 4.58 Rp. 1,443,067.90 Rp. 6,609,250.99
- Pelesteran 1 : 5 Tebal 15 mm M2 81.40 Rp. 80,485.42 Rp. 6,551,512.86
- Acian M2 81.40 Rp. 47,903.35 Rp. 3,899,332.69
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 81.40 Rp. 26,778.18 Rp. 2,179,743.85
NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH HARGA

3 Pek. Kolom Type 2, 25/40


- Pembesian 8 Ø 12" Kg 20.25 Rp. 18,168.11 Rp. 367,904.26
- Besi Beugel Ø 8" - 15 Kg 9.61 Rp. 19,398.92 Rp. 186,423.66
- Bekisting Plywood/Multipleks 1 Kali Pakai M2 3.36 Rp. 353,275.78 Rp. 1,187,006.62
- Cor Beton K250 M3 0.23 Rp. 1,443,067.90 Rp. 331,905.62
- Pelesteran 1 : 5 Tebal 15 mm M2 3.71 Rp. 80,485.42 Rp. 298,600.89
- Acian M2 3.71 Rp. 47,903.35 Rp. 177,721.43
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 3.71 Rp. 26,778.18 Rp. 99,347.05
4 Pek. Kolom Type 3, 15/15
- Pembesian 4 Ø 12" Kg 473.48 Rp. 18,168.11 Rp. 8,602,237.55
- Besi Beugel Ø 8" - 15 Kg 203.59 Rp. 19,398.92 Rp. 3,949,426.96
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 26.66 Rp. 353,275.78 Rp. 9,418,332.29
- Cor Beton K250 M3 1.92 Rp. 1,443,067.90 Rp. 2,770,690.37
- Pelesteran 1 : 5 Tebal 15 mm M2 68.82 Rp. 80,485.42 Rp. 5,539,006.33
- Acian M2 68.82 Rp. 47,903.35 Rp. 3,296,708.55
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 68.82 Rp. 26,778.18 Rp. 1,842,874.35
5 Pek. Balok Type 1, 15/15
- Pembesian 4 Ø 12" Kg 554.11 Rp. 18,168.11 Rp. 10,067,132.40
- Besi Beugel Ø 8" - 15 Kg 238.26 Rp. 19,398.92 Rp. 4,621,987.66
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 12.48 Rp. 360,898.78 Rp. 4,504,016.77
- Cor Beton K250 M3 2.25 Rp. 1,443,067.90 Rp. 3,246,902.78
- Pelesteran 1 : 5 Tebal 15 mm M2 37.44 Rp. 80,485.42 Rp. 3,013,373.98
- Acian (Bagian Luar) M2 37.44 Rp. 47,903.35 Rp. 1,793,501.42
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 37.44 Rp. 26,778.18 Rp. 1,002,575.06
6 Pek. Balok Type 2, 15/15
- Pembesian 4 Ø 12" Kg 554.11 Rp. 18,168.11 Rp. 10,067,132.40
- Besi Beugel Ø 8" - 15 Kg 238.26 Rp. 19,398.92 Rp. 4,621,987.66
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 12.48 Rp. 360,898.78 Rp. 4,504,016.77
- Cor Beton K250 M3 2.25 Rp. 1,443,067.90 Rp. 3,246,902.78
- Pelesteran 1 : 5 Tebal 15 mm M2 37.44 Rp. 80,485.42 Rp. 3,013,373.98
- Acian (Bagian Luar) M2 37.44 Rp. 47,903.35 Rp. 1,793,501.42
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 37.44 Rp. 26,778.18 Rp. 1,002,575.06
7 Pek. Balok Type 3, 15/20
- Pembesian 6 Ø 12" Kg 29.30 Rp. 18,168.11 Rp. 532,325.67
- Besi Beugel Ø 8" - 15 Kg 9.85 Rp. 19,398.92 Rp. 191,079.40
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 2.20 Rp. 360,898.78 Rp. 793,977.32
- Cor Beton K250 M3 0.11 Rp. 1,443,067.90 Rp. 158,737.47
- Pelesteran 1 : 5 Tebal 15 mm M2 3.03 Rp. 80,485.42 Rp. 243,870.81
- Acian (Bagian Luar) M2 3.03 Rp. 47,903.35 Rp. 145,147.15
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 3.03 Rp. 26,778.18 Rp. 81,137.89
8 Pek. Dak Beton Pintu dan Jendela
- Pembesian Ø 12" - 15 (1 Layer) Kg 70.09 Rp. 18,168.11 Rp. 1,273,402.95
- Bekisting Plywood/Multipleks 2 Kali Pakai M2 2.96 Rp. 419,275.78 Rp. 1,241,056.31
- Cor Beton K250 M3 0.59 Rp. 1,443,067.90 Rp. 851,410.06
- Pelesteran 1 : 5 Tebal 15 mm M2 14.80 Rp. 80,485.42 Rp. 1,191,184.16
- Acian M2 14.80 Rp. 47,903.35 Rp. 708,969.58
- Pek. 2 Lapis Cat Waterproof M2 14.80 Rp. 149,948.48 Rp. 2,219,237.50
9 Pek. Plat Dak Beton (Teras)
- Pembesian Ø 12" - 15 (1 Layer) Kg 117.10 Rp. 18,168.11 Rp. 2,127,485.89
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 9.89 Rp. 419,275.78 Rp. 4,146,637.46
- Cor Beton K250 M3 1.19 Rp. 1,443,067.90 Rp. 1,717,250.80
- Pelesteran 1 : 5 Tebal 15 mm M2 19.78 Rp. 80,485.42 Rp. 1,592,001.53
- Acian M2 19.78 Rp. 47,903.35 Rp. 947,528.26
- Serat Fiber Lebar 85 Cm M2 9.89 Rp. 24,083.16 Rp. 238,182.43
- Pek. 2 Lapis Cat Waterproof Lebar 85 Cm M2 9.89 Rp. 149,948.48 Rp. 1,482,990.47
10 Pek. Profil Beton (Depan)
- Pembesian Ø 12" - 15 (1 Layer) Kg 197.96 Rp. 18,168.11 Rp. 3,596,559.40
- Bekisting Plywood/Multipleks 2 Kali Pakai M2 8.36 Rp. 419,275.78 Rp. 3,505,145.52
- Cor Beton K250 M3 2.01 Rp. 1,443,067.90 Rp. 2,900,566.48

NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH HARGA

- Pelesteran 1 : 5 Tebal 15 mm M2 75.29 Rp. 80,485.42 Rp. 6,059,746.97


- Acian M2 75.29 Rp. 47,903.35 Rp. 3,606,643.22
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 75.29 Rp. 26,778.18 Rp. 2,016,129.17
11 Pek. Cor Beton K200 Lantai Kerja 7 Cm M3 16.84 Rp. 1,383,182.01 Rp. 23,292,785.01
12 Pek. Cor Rabat K200 Keliling Bangunan 10 Cm M3 6.90 Rp. 1,383,182.01 Rp. 9,543,955.85
13 Pek. Plat Meja Beton (Rg. Spoelhoek dan Pantri)
- Pembesian Ø 10" - 15 (1 Layer) Kg 16.78 Rp. 18,831.27 Rp. 315,988.77
- Bekisting Plywood/Multipleks 3 Kali Pakai M2 2.38 Rp. 419,275.78 Rp. 997,876.36
- Batu Bata 1/2 Bata 1 : 5 M2 1.40 Rp. 163,759.97 Rp. 229,263.96
- Cor Beton K250 M3 0.20 Rp. 1,443,067.90 Rp. 288,613.58
- Pelesteran 1 : 5 Tebal 15 mm M2 2.80 Rp. 80,485.42 Rp. 225,359.16
- Acian M2 2.80 Rp. 47,903.35 Rp. 134,129.38
- Keramik 30 x 30 Cm Kasar M2 1.56 Rp. 174,701.13 Rp. 272,533.76
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite M2 2.80 Rp. 26,778.18 Rp. 74,978.90
- Kitchen Zync Stainless Steel (Single) Bh 4.00 Rp. 1,155,000.00 Rp. 4,620,000.00
JUMLAH IV Rp 249,778,437.64

V PEKERJAAN BESI DAN ALUMUNIUM

1 Pek. Kuda-Kuda Baja Ringan Taso C.75.100 M2 372.12 Rp. 172,437.21 Rp. 64,167,334.59
2 Pek. Rangka Plafond Besi Hollow 40.40.0,5 mm, Modul 60/60 M2 302.81 Rp. 228,382.88 Rp. 69,156,619.89
3 Pek. Atap Spandek Zincalume Berpasir 0,40 mm M2 372.12 Rp. 126,266.36 Rp. 46,986,237.88
4 Pek. Nok Atap Seng Berpasir M1 53.40 Rp. 113,242.58 Rp. 6,047,153.77
5 Pek. Plafond Tripleks 4 mm M2 302.81 Rp. 57,377.10 Rp. 17,374,359.65
6 Pek. List Plafond Kayu Profil M1 374.25 Rp. 31,844.23 Rp. 11,917,703.08
7 Pek. Listplank Kayu Kelas II M1 73.20 Rp. 77,564.30 Rp. 5,677,706.76
8 Pek. Pintu Type P1, 1 Buah
- Kusen Pintu Aluminium Putih 4" M1 5.75 Rp. 170,787.39 Rp. 982,027.47
- Panil Pintu Kaca Tempered 12 mm M2 3.01 Rp. 724,071.46 Rp. 2,179,455.09
- Penjepit Kaca Atas Bh 2.00 Rp. 318,191.28 Rp. 636,382.56
- Penjepit Kaca Bawah Bh 2.00 Rp. 318,191.28 Rp. 636,382.56
- Gantungan Pintu Kaca Atas Bh 2.00 Rp. 104,461.28 Rp. 208,922.56
- Gantungan Pintu Kaca Bawah Bh 2.00 Rp. 845,747.98 Rp. 1,691,495.96
- Kunci Pintu Kaca Bh 1.00 Rp. 606,941.28 Rp. 606,941.28
- Door Pull Pintu Kaca Stainless (80 cm) Psg 2.00 Rp. 375,941.28 Rp. 751,882.56
- Kusen Jendela dan Ventilasi Aluminium Putih 4" M1 22.30 Rp. 170,787.39 Rp. 3,808,558.71
- Bingkai Ventilasi Aluminium Putih 4" M2 0.88 Rp. 705,333.20 Rp. 620,693.22
- Kaca Jendela dan Ventilasi Bening 5 mm M2 2.76 Rp. 193,420.13 Rp. 533,839.55
- Engsel Ventilasi Casement 8" Bh 8.00 Rp. 74,206.33 Rp. 593,650.64
- Gagang Ventilasi Rambuncis Bh 4.00 Rp. 54,851.28 Rp. 219,405.12
9 Pek. Jendela Type J1, 3 Buah
- Kusen Jendela dan Ventilasi Aluminium Putih 4" Alexindo M1 61.65 Rp. 170,787.39 Rp. 10,529,042.35
- Bingkai Jendela dan Ventilasi Aluminium Putih 4" M2 7.32 Rp. 705,333.20 Rp. 5,163,039.02
- Kaca Jendela dan Ventilasi Bening 5 mm M2 9.45 Rp. 193,420.13 Rp. 1,827,820.21
- Engsel Jendela Casement 10" Bh 24.00 Rp. 79,926.33 Rp. 1,918,231.92
- Engsel Ventilasi Casement 8" Bh 24.00 Rp. 74,206.33 Rp. 1,780,951.92
- Gagang Jendela dan Ventilasi Rambuncis Bh 24.00 Rp. 54,851.28 Rp. 1,316,430.72
10 Pek. Jendela Type J2, 4 Buah
- Kusen Jendela dan Ventilasi Aluminium Putih 4" Alexindo M1 40.60 Rp. 170,787.39 Rp. 6,933,967.87
- Bingkai Jendela dan Ventilasi Aluminium Putih 4" M2 5.68 Rp. 705,333.20 Rp. 4,006,292.58
- Kaca Jendela dan Ventilasi Bening 5 mm M2 4.64 Rp. 193,420.13 Rp. 897,469.39
- Engsel Jendela Casement 10" Bh 16.00 Rp. 79,926.33 Rp. 1,278,821.28
- Engsel Ventilasi Casement 8" Bh 16.00 Rp. 74,206.33 Rp. 1,187,301.28
- Gagang Jendela dan Ventilasi Rambuncis Bh 16.00 Rp. 54,851.28 Rp. 877,620.48
11 Pek. Ventilasi Type V1, 6 Buah
- Kusen Ventilasi Aluminium Putih 4" Alexindo M1 42.00 Rp. 170,787.39 Rp. 7,173,070.21
- Kaca Ventilasi Bening 5 mm M2 4.80 Rp. 193,420.13 Rp. 928,416.61
12 Pek. Jendela Type V2, 4 Buah
- Kusen Ventilasi Aluminium Putih 4" Alexindo M1 15.20 Rp. 170,787.39 Rp. 2,595,968.27
- Bingkai Ventilasi Aluminium Putih 4" M2 1.44 Rp. 705,333.20 Rp. 1,015,679.81

NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH HARGA

- Kaca Ventilasi Bening 5 mm M2 0.96 Rp. 193,420.13 Rp. 185,683.32


- Engsel Ventilasi Casement 8" Bh 16.00 Rp. 74,206.33 Rp. 1,187,301.28
- Gagang Ventilasi Rambuncis Bh 8.00 Rp. 54,851.28 Rp. 438,810.24
13 Pek. Pintu Toilet Type P5 (Buka Kanan), 3 Buah
- Kusen Pintu Aluminium Coat Putih 4" Alexindo M1 14.10 Rp. 170,787.39 Rp. 2,408,102.14
- Pintu Aluminium Strip Coat Putih M2 3.99 Rp. 805,174.17 Rp. 3,212,644.95
- Gagang Pintu Km/Wc Bulat Plastik Bh 3.00 Rp. 45,496.33 Rp. 136,488.99
- Engsel Pintu Aluminium Bh 9.00 Rp. 47,516.13 Rp. 427,645.15
- Grendel Pintu Km/Wc Bh 6.00 Rp. 51,586.13 Rp. 309,516.77
14 Pek. Pintu Toilet Type P6 (Buka Kanan), 1 Buah
- Kusen Pintu Aluminium Coat Putih 4" Alexindo M1 4.70 Rp. 170,787.39 Rp. 802,700.71
- Pintu Aluminium Strip Coat Putih M2 1.33 Rp. 805,174.17 Rp. 1,070,881.65
- Gagang Pintu Km/Wc Bulat Plastik Bh 1.00 Rp. 45,496.33 Rp. 45,496.33
- Engsel Pintu Aluminium Bh 3.00 Rp. 47,516.13 Rp. 142,548.38
- Grendel Pintu Km/Wc Bh 2.00 Rp. 51,586.13 Rp. 103,172.26
15 Pek. Panel Dinding Aluminium Kaca
- Kusen Pintu Aluminium Coat Putih 4" Alexindo M1 52.10 Rp. 170,787.39 Rp. 8,898,022.81
- Pintu Aluminium Coat Putih 4" Alexindo M2 0.52 Rp. 705,333.20 Rp. 366,773.26
- Kunci Pintu Aluminium Bh 1.00 Rp. 606,941.28 Rp. 606,941.28
- Door Pull Pintu Stainless (60 cm) Psg 2.00 Rp. 279,403.30 Rp. 558,806.60
- Engsel Pintu Aluminium Bh 3.00 Rp. 47,516.13 Rp. 142,548.38
- Kaca Bening 5 mm M2 19.96 Rp. 193,420.13 Rp. 3,860,665.75
JUMLAH V Rp 309,131,627.09

VI PEKERJAAN KAYU

1 Pek. Pintu Type P2 Double Door, 3 Buah


- Kusen Pintu Kayu 6/16 Kelas II M3 0.17 Rp. 7,037,448.00 Rp. 1,196,366.16
- Pintu Panil Kayu Kelas II M2 8.82 Rp. 764,423.00 Rp. 6,742,210.86
- Engsel Pintu Kualitas Baik Bh 8.00 Rp. 91,956.13 Rp. 735,649.02
- Silinder Kunci Pintu 2 Slaag Bh 1.00 Rp. 202,691.28 Rp. 202,691.28
- Handle Pintu Stainless 60 Cm Psg 2.00 Rp. 279,403.30 Rp. 558,806.60
- Kaca Bening 8 mm M2 2.27 Rp. 257,794.39 Rp. 585,193.27
- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) M2 22.14 Rp. 59,860.68 Rp. 1,325,315.46
- Grendel Pintu Bh 2.00 Rp. 67,501.28 Rp. 135,002.56
- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo M1 13.50 Rp. 170,787.39 Rp. 2,305,629.71
2 Pek. Pintu Type P3 Single Door / Buka Kanan, 5 Buah
- Kusen Pintu Kayu 6/16 Kelas II M3 0.26 Rp. 7,037,448.00 Rp. 1,829,736.48
- Pintu Panil Kayu Kelas II M2 8.40 Rp. 764,423.00 Rp. 6,421,153.20
- Engsel Pintu Kualitas Baik Bh 20.00 Rp. 91,956.13 Rp. 1,839,122.56
- Kunci Pintu 2 Slaag setara Yale Bh 5.00 Rp. 298,717.98 Rp. 1,493,589.90
- Kaca Bening 8 mm M2 2.09 Rp. 257,794.39 Rp. 538,790.28
- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) M2 23.55 Rp. 59,860.68 Rp. 1,409,719.01
- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo M1 14.00 Rp. 170,787.39 Rp. 2,391,023.40
3 Pek. Pintu Type P4 Single Door / Buka Kiri, 9 Buah
- Kusen Pintu Kayu 6/16 Kelas II M3 0.47 Rp. 7,037,448.00 Rp. 3,307,600.56
- Pintu Panil Kayu Kelas II M2 15.12 Rp. 764,423.00 Rp. 11,558,075.76
- Engsel Pintu Kualitas Baik Bh 36.00 Rp. 91,956.13 Rp. 3,310,420.61
- Kunci Pintu 2 Slaag setara Yale Bh 9.00 Rp. 298,717.98 Rp. 2,688,461.82
- Kaca Bening 8 mm M2 3.76 Rp. 257,794.39 Rp. 969,306.92
- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) M2 42.39 Rp. 59,860.68 Rp. 2,537,494.23
- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo M1 25.20 Rp. 170,787.39 Rp. 4,303,842.13
JUMLAH VI Rp 58,385,201.79
VII PEKERJAAN INSTALASI LISTRIK

1 Pas. Boks Panel Listrik 3 Phase Komplit Set 1.00 Rp. 5,000,000.00 Rp. 5,000,000.00
2 Pek. Pas. Titik Lampu dan Sakelar (Tanam dalam Dinding) Ttk 30.00 Rp. 110,200.00 Rp. 3,306,000.00
3 Pek. Pas. Titik Stop Kontak (Tanam dalam Dinding) Ttk 16.00 Rp. 110,200.00 Rp. 1,763,200.00
4 Pek. Pas. Titik AC (Tanam dalam Dinding) Ttk 12.00 Rp. 110,200.00 Rp. 1,322,400.00
5 Pek. Pas. MCB Jalur Titik dan AC Bh 15.00 Rp. 110,200.00 Rp. 1,653,000.00
6 Pek. Pas. Lampu LED RM 2 x 18 Watt Merk Phillips Bh 8.00 Rp. 325,500.00 Rp. 2,604,000.00

NO URAIAN PEKERJAAN SAT. VOL. HARGA SATUAN JUMLAH HARGA

7 Pek. Pas. Lampu Downlight LED 9 Watt Merk Phillips Bh 7.00 Rp. 88,200.00 Rp. 617,400.00
8 Pek. Pas. Lampu Downlight LED 23 Watt Merk Phillips Bh 15.00 Rp. 141,700.00 Rp. 2,125,500.00
9 Pek. Pas. Sakelar 2 Gang Merk Panasonic Fluorescence Bh 10.00 Rp. 51,400.00 Rp. 514,000.00
10 Pek. Pas. Sakelar 3 Gang Merk Panasonic Fluorescence Bh 10.00 Rp. 67,200.00 Rp. 672,000.00
11 Pek. Pas. Stop Kontak Dinding 2 Gang Merk Panasonic Schuko Bh 16.00 Rp. 76,600.00 Rp. 1,225,600.00
12 Pek. Pas. Exchaust Fan Bh 6.00 Rp. 325,500.00 Rp. 1,953,000.00
13 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, Lampu dan Sakelar M1 150.00 Rp. 14,700.00 Rp. 2,205,000.00
14 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, AC M1 150.00 Rp. 14,700.00 Rp. 2,205,000.00
15 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, Stop Kontak M1 150.00 Rp. 14,700.00 Rp. 2,205,000.00
JUMLAH VII Rp 29,371,100.00

VIII PEKERJAAN SANITASI DAN PIPA

1 Pek. Pipa Inst. Air Bersih (PPR 1/2") M1 30.00 Rp. 47,042.82 Rp. 1,411,284.60
2 Pek. Pipa Air Kotor (PVC AW 4") dari Km/Wc ke IPAL M1 22.00 Rp. 178,848.89 Rp. 3,934,675.58
3 Pek. Pipa Closed (PVC AW 4") ke Septictank M1 20.00 Rp. 178,848.89 Rp. 3,576,977.80
4 Pek. Closed Duduk Toto + Jet Spray Komplit Bh 4.00 Rp. 3,805,940.60 Rp. 15,223,762.40
5 Pek. Pegangan Km/Wc Stainless Bh 4.00 Rp. 342,983.30 Rp. 1,371,933.20
6 Pek. Kran Air Km/Wc Toto Bh 4.00 Rp. 304,186.30 Rp. 1,216,745.20
7 Pek. Floor Drain Stainless Merk Onda Bh 4.00 Rp. 210,103.30 Rp. 840,413.20
8 Pek. Septictank (2,3x1x1,5m), 2 Buah
- Pek. Galian Tanah M3 6.60 Rp. 85,816.50 Rp. 566,388.90
- Urugan Pasir M3 0.22 Rp. 276,810.60 Rp. 60,898.33
- Pas. Batu Bata 1 : 3 M2 25.50 Rp. 171,974.33 Rp. 4,385,345.42
- Pelesteran Dinding 1 : 3 M2 25.50 Rp. 84,952.49 Rp. 2,166,288.60
- Besi Ø 10 -15 mm (2 Layer) Kg 72.39 Rp. 18,831.27 Rp. 1,363,195.90
- Bekisting M2 4.40 Rp. 419,275.78 Rp. 1,844,813.43
- Cor Beton Bertulang K 250, T = 10 Cm M3 0.44 Rp. 1,443,067.90 Rp. 634,949.88
- Cor Beton K 250, T = 7 Cm M3 0.31 Rp. 1,443,067.90 Rp. 447,351.05
- Pas. Pipa PVC Ø 2" (Penghawaan) M1 2.00 Rp. 67,473.23 Rp. 134,946.46
9 Pek. Peresapan (1.25x1x1.15m), 2 Buah
- Pek. Galian Tanah M3 2.88 Rp. 85,816.50 Rp. 247,151.52
- Pas. Pipa PVC Ø 3" (dilubangi) M1 3.00 Rp. 121,731.39 Rp. 365,194.17
- Urugan Batu Karang M3 0.63 Rp. 628,849.98 Rp. 396,175.49
- Urugan Pasir M3 0.63 Rp. 276,810.60 Rp. 174,390.68
- Urugan Kembali M3 1.63 Rp. 61,633.00 Rp. 100,461.79
JUMLAH VIII Rp 40,463,343.59

IX PEKERJAAN PENGECATAN

1 Pek. 1 Lapis Plamur + 3 Lapis Cat Dinding dan Pondasi setara Metrolite M2 888.32 Rp. 26,778.18 Rp. 23,787,592.86
JUMLAH IX Rp 23,787,592.86

X PEKERJAAN AKHIR

1 Pemb. Laporan dan Backup Data Ls 1.00 Rp. 1,805,000.00 Rp. 1,805,000.00
2 Pemb. Asbuilt Drawing Ls 1.00 Rp. 2,000,000.00 Rp. 2,000,000.00
3 Pek. Pembersihan Akhir Ls 1.00 Rp. 2,000,000.00 Rp. 2,000,000.00
JUMLAH X Rp 5,805,000.00
1,094,603,325.79 0.5838
1,094,603,325.79 0.9825
161.50 1,094,603,325.79 0.9991
1,094,603,325.79 0.0257
1,094,603,325.79 0.0232

38.76 1,094,603,325.79 0.3039


2.42 1,094,603,325.79 0.0136
72.30 1,094,603,325.79 0.6151
12.72 1,094,603,325.79 0.3217
4.85 1,094,603,325.79 0.1227

24.23 1,094,603,325.79 1.3920


30.28 1,094,603,325.79 3.2872
455.92 1,094,603,325.79 6.8209 4103.28
225.92 1,094,603,325.79 5.6510
7.30 1,094,603,325.79 0.1975
213.05 1,094,603,325.79 1.9501
8.55 1,094,603,325.79 0.1744 3.15 2.7 2.7
7.29 1,094,603,325.79 0.1330
38.64 1,094,603,325.79 0.6167
873.20 1,094,603,325.79 6.4206
888.32 1,094,603,325.79 3.8876 15.125

573.65 1,094,603,325.79 0.9521


289.19 1,094,603,325.79 0.5125
21.53 1,094,603,325.79 0.4183
3.29 1,094,603,325.79 0.4337
13.00 1,094,603,325.79 0.0956
13.00 1,094,603,325.79 0.0569
13.00 1,094,603,325.79 0.0318

504.03 1,094,603,325.79 0.8366


244.13 1,094,603,325.79 0.4327
31.53 1,094,603,325.79 1.0176
4.58 1,094,603,325.79 0.6038
81.40 1,094,603,325.79 0.5985
81.40 1,094,603,325.79 0.3562
81.40 1,094,603,325.79 0.1991
20.25 1,094,603,325.79 0.0336
9.61 1,094,603,325.79 0.0170
3.36 1,094,603,325.79 0.1084
0.23 1,094,603,325.79 0.0303
3.71 1,094,603,325.79 0.0273
3.71 1,094,603,325.79 0.0162
3.71 1,094,603,325.79 0.0091

473.48 1,094,603,325.79 0.7859


203.59 1,094,603,325.79 0.3608
26.66 1,094,603,325.79 0.8604
1.92 1,094,603,325.79 0.2531
68.82 1,094,603,325.79 0.5060
68.82 1,094,603,325.79 0.3012
68.82 1,094,603,325.79 0.1684

554.11 1,094,603,325.79 0.9197


238.26 1,094,603,325.79 0.4223
12.48 1,094,603,325.79 0.4115
2.25 1,094,603,325.79 0.2966
37.44 1,094,603,325.79 0.2753
37.44 1,094,603,325.79 0.1638
37.44 1,094,603,325.79 0.0916

554.11 1,094,603,325.79 0.9197


238.26 1,094,603,325.79 0.4223
12.48 1,094,603,325.79 0.4115
2.25 1,094,603,325.79 0.2966
37.44 1,094,603,325.79 0.2753
37.44 1,094,603,325.79 0.1638
37.44 1,094,603,325.79 0.0916

29.30 1,094,603,325.79 0.0486


9.85 1,094,603,325.79 0.0175
2.20 1,094,603,325.79 0.0725
0.11 1,094,603,325.79 0.0145
3.03 1,094,603,325.79 0.0223
3.03 1,094,603,325.79 0.0133
3.03 1,094,603,325.79 0.0074

70.09 1,094,603,325.79 0.1163


2.96 1,094,603,325.79 0.1134
0.59 1,094,603,325.79 0.0778
14.80 1,094,603,325.79 0.1088
14.80 1,094,603,325.79 0.0648
14.80 1,094,603,325.79 0.2027

117.10 1,094,603,325.79 0.1944


9.89 1,094,603,325.79 0.3788
1.19 1,094,603,325.79 0.1569
19.78 1,094,603,325.79 0.1454
19.78 1,094,603,325.79 0.0866
9.89 1,094,603,325.79 0.0218
9.89 1,094,603,325.79 0.1355
197.96 1,094,603,325.79 0.3286
8.36 1,094,603,325.79 0.3202
2.01 1,094,603,325.79 0.2650

75.29 1,094,603,325.79 0.5536 27.9 13.95 41.85


1,094,603,325.79 0.3295
1,094,603,325.79 0.1842
16.84 1,094,603,325.79 2.1280
6.90 1,094,603,325.79 0.8719

16.78 1,094,603,325.79 0.0289


2.38 1,094,603,325.79 0.0912
1.40 1,094,603,325.79 0.0209
0.20 1,094,603,325.79 0.0264
2.80 1,094,603,325.79 0.0206
1,094,603,325.79 0.0123
1.56 1,094,603,325.79 0.0249
1,094,603,325.79 0.0068
1,094,603,325.79 0.4221

372.12 1,094,603,325.79 5.8622


302.81 1,094,603,325.79 6.3180
372.12 1,094,603,325.79 4.2925
53.40 1,094,603,325.79 0.5525
1,094,603,325.79 1.5873
374.25 1,094,603,325.79 1.0888
73.20 1,094,603,325.79 0.5187

1,094,603,325.79 0.0897
1,094,603,325.79 0.1991
1,094,603,325.79 0.0581
1,094,603,325.79 0.0581
1,094,603,325.79 0.0191
1,094,603,325.79 0.1545
1,094,603,325.79 0.0554
1,094,603,325.79 0.0687
22.30 1,094,603,325.79 0.3479
0.88 1,094,603,325.79 0.0567
2.76 1,094,603,325.79 0.0488
8.00 1,094,603,325.79 0.0542
4.00 1,094,603,325.79 0.0200

61.65 1,094,603,325.79 0.9619


7.32 1,094,603,325.79 0.4717
9.45 1,094,603,325.79 0.1670
24 1,094,603,325.79 0.1752
24 1,094,603,325.79 0.1627
24 1,094,603,325.79 0.1203

40.60 1,094,603,325.79 0.6335


5.68 1,094,603,325.79 0.3660
4.64 1,094,603,325.79 0.0820
16 1,094,603,325.79 0.1168
16 1,094,603,325.79 0.1085
16 1,094,603,325.79 0.0802
42.00 1,094,603,325.79 0.6553
4.80 1,094,603,325.79 0.0848

15.20 1,094,603,325.79 0.2372


1.44 1,094,603,325.79 0.0928

0.96 1,094,603,325.79 0.0170


16.00 1,094,603,325.79 0.1085
8.00 1,094,603,325.79 0.0401

14.10 1,094,603,325.79 0.2200


3.99 1,094,603,325.79 0.2935
3.00 1,094,603,325.79 0.0125
9.00 1,094,603,325.79 0.0391
6.00 1,094,603,325.79 0.0283

4.70 1,094,603,325.79 0.0733


1.33 1,094,603,325.79 0.0978
1.00 1,094,603,325.79 0.0042
3.00 1,094,603,325.79 0.0130
2.00 1,094,603,325.79 0.0094

52.10 1,094,603,325.79 0.8129


0.52 1,094,603,325.79 0.0335
1,094,603,325.79 0.0554
1,094,603,325.79 0.0511
1,094,603,325.79 0.0130
19.96 1,094,603,325.79 0.3527

0.17 1,094,603,325.79 0.1093


8.82 1,094,603,325.79 0.6160
8.00 1,094,603,325.79 0.0672
1.00 1,094,603,325.79 0.0185
2.00 1,094,603,325.79 0.0511
2.27 1,094,603,325.79 0.0535
22.14 1,094,603,325.79 0.1211
2.00 1,094,603,325.79 0.0123
13.50 1,094,603,325.79 0.2106

0.26 1,094,603,325.79 0.1672


8.40 1,094,603,325.79 0.5866
20.00 1,094,603,325.79 0.1680
5.00 1,094,603,325.79 0.1365
2.09 1,094,603,325.79 0.0492
23.55 1,094,603,325.79 0.1288
14.00 1,094,603,325.79 0.2184

0.47 1,094,603,325.79 0.3022


15.12 1,094,603,325.79 1.0559
36.00 1,094,603,325.79 0.3024
9.00 1,094,603,325.79 0.2456
3.76 1,094,603,325.79 0.0886
42.39 1,094,603,325.79 0.2318
25.20 1,094,603,325.79 0.3932
1,094,603,325.79 0.4568
1,094,603,325.79 0.3020
1,094,603,325.79 0.1611
1,094,603,325.79 0.1208
1,094,603,325.79 0.1510
1,094,603,325.79 0.2379

1,094,603,325.79 0.0564
1,094,603,325.79 0.1942
1,094,603,325.79 0.0470
1,094,603,325.79 0.0614
1,094,603,325.79 0.1120
1,094,603,325.79 0.1784
1,094,603,325.79 0.2014
1,094,603,325.79 0.2014
1,094,603,325.79 0.2014

1,094,603,325.79 0.1289
1,094,603,325.79 0.3595
1,094,603,325.79 0.3268
1,094,603,325.79 1.3908
1,094,603,325.79 0.1253
1,094,603,325.79 0.1112
1,094,603,325.79 0.0768

6.60 1,094,603,325.79 0.0517


0.22 1,094,603,325.79 0.0056
25.50 1,094,603,325.79 0.4006
25.50 1,094,603,325.79 0.1979
72.39 1,094,603,325.79 0.1245
4.40 1,094,603,325.79 0.1685
0.44 1,094,603,325.79 0.0580
0.31 1,094,603,325.79 0.0409
2.00 1,094,603,325.79 0.0123

2.88 1,094,603,325.79 0.0226


3.00 1,094,603,325.79 0.0334
0.63 1,094,603,325.79 0.0362
0.63 1,094,603,325.79 0.0159
1.63 1,094,603,325.79 0.0092

888.32 1,094,603,325.79 2.1732

1,094,603,325.79 0.1649
1,094,603,325.79 0.1827
1,094,603,325.79 0.1827

100.0000
LUAS BANGUNAN

URAIAN PANJANG LEBAR

JUMLAH LANTAI 1 + 2

LANTAI 1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1

LANTAI 2
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
PEKERJAAN PERSIAPAN

URAIAN PANJANG

VOLUME PENGUKURAN DAN PEMASANGAN BOUWPLANK


- Sisi M1
- Sisi M1
- Sisi M1
- Sisi M1

URAIAN PANJANG LEBAR

VOLUME TIMBUNAN HALAMAN


- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1

URAIAN PANJANG

VOLUME PAGAR SEMENTARA


- Sisi M1
- Sisi M1
- Sisi M1
- Sisi M1

PEKERJAAN TANAH DAN PASIR

URAIAN PANJANG LEBAR

VOLUME STRAUSS PILE


- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
VOLUME BETON CYCLOP
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1

URAIAN PANJANG LEBAR

VOLUME GALIAN TANAH PONDASI TYPE 1


- Galian Tanah horisontal 86.50 M1 0.60
- Galian Tanah vertikal 75.00 M1 0.60
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 2


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 3 (STEP DEPAN)


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 4 (STEP BELAKANG)


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 1


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 2


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 3


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 4


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 5


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 1
- Urugan Kembali 86.50 M1 0.10
- Urugan Kembali 75.00 M1 0.10
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 2


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 3


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 4


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN BEKAS GALIAN FOOT PLAT 1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 2


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 3


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 4


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 5


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN / TIMBUNAN TANAH STEP TRIBUN DAN TANGGA
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

VOLUME URUGAN / TIMBUNAN TANAH GEDUNG UTAMA


- Urugan Tanah TERAS 3.50 M1 1.50
- Urugan Tanah KM/WC 1.50 M1 1.50
- Urugan Tanah KM/WC 1.50 M1 1.50
- Urugan Tanah RG TGGU 6.25 M1 3.00
- Urugan Tanah RG TGGU 2.75 M1 1.00
- Urugan Tanah KE KM/WC 1.50 M1 1.25
- Urugan Tanah RG DISKUSI 3.50 M1 2.75
- Urugan Tanah LORONG 6.50 M1 1.25
- Urugan Tanah RG ALAT 1.50 M1 2.50
- Urugan Tanah SPOELHOCK 3.00 M1 2.75
- Urugan Tanah RG PERAWATAN 3.00 M1 6.75
- Urugan Tanah RG PERAWATAN 6.00 M1 12.75
- Urugan Tanah RG PERAWATAN 3.00 M1 7.75
- Urugan Tanah PENYIPANAN ALAT 3.00 M1 3.00
- Urugan Tanah PANTRI 3.00 M1 3.00
- Urugan Tanah AREA BERSIH 9.75 M1 1.50
- Urugan Tanah AREA BERSIH 2.00 M1 2.25
- Urugan Tanah ISTRAHAT DOKTER 2.25 M1 3.00
- Urugan Tanah LINEN 2.25 M1 1.75
- Urugan Tanah ISTRAHAT WANITA 2.25 M1 3.00
- Urugan Tanah ISTRAHAT PRIA 2.25 M1 3.00
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

VOLUME URUGAN / TIMBUNAN TANAH TAMAN


- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

URAIAN

VOLUME URUGAN / TIMBUNAN TANAH GEDUNG UTAMA 108.64

VOLUME URUGAN / TIMBUNAN TANAH STEP TRIBUN DAN TANGGA -


VOLUME URUGAN / TIMBUNAN TANAH TAMAN -

PLUS PEMADATAN 10%

VOLUME TIMBUNAN DIDATANGKAN

VOLUME TOTAL URUGAN / TIMBUNAN

VOLUME TOTAL GALIAN ( BT. KALI & FOOT PLAT )

VOLUME URUGAN KEMBALI (BT, KALI & FOOT PLAT

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN PASIR BAWAH LANTAI 1 DROP OFF DAN RAM
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir M1

VOLUME URUGAN PASIR BAWAH LANTAI GEDUNG UTAMA


- Urugan Pasir 3.50 M1 1.50
- Urugan Pasir 1.50 M1 1.50
- Urugan Pasir 1.50 M1 1.50
- Urugan Pasir 6.25 M1 3.00
- Urugan Pasir 2.75 M1 1.00
- Urugan Pasir 1.50 M1 1.25
- Urugan Pasir 3.50 M1 2.75
- Urugan Pasir 6.50 M1 1.25
- Urugan Pasir 1.50 M1 2.50
- Urugan Pasir 3.00 M1 2.75
- Urugan Pasir 3.00 M1 6.75
- Urugan Pasir 6.00 M1 12.75
- Urugan Pasir 3.00 M1 7.75
- Urugan Pasir 3.00 M1 3.00
- Urugan Pasir 3.00 M1 3.00
- Urugan Pasir 9.75 M1 1.50
- Urugan Pasir 2.00 M1 2.25
- Urugan Pasir 2.25 M1 3.00
- Urugan Pasir 2.25 M1 1.75
- Urugan Pasir 2.25 M1 3.00
- Urugan Pasir 2.25 M1 3.00
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir M1
- Urugan Pasir M1

VOLUME URUGAN PASIR BAWAH LANTAI TAMAN


- Urugan Pasir - M1 -
- Urugan Pasir M1
- Urugan Pasir M1
- Urugan Pasir M1
- Urugan Pasir M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 1
- Urugan Pasir Pondasi 86.50 M1 0.60
- Urugan Pasir Pondasi 75.00 M1 0.60
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 2


- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 3


- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 4


- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 2


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 3


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 4


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 5


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

PEKERJAAN PASANGAN DAN PELESTE

LANTAI 1

URAIAN PANJANG LEBAR

VOLUME PONDASI BETON CYCLOP


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 1


- Pas. Batu Kosong 86.50 M1 0.60
- Pas. Batu Kosong 75.00 M1 0.60
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 2


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 3


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 4


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PONDASI BATU KALI / GUNUNG 1
- Pas. Batu Kali 86.50 M1 0.25
- Pas. Batu Kali 75.00 M1 0.25
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 2


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 3


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 4


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI TALUD


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

URAIAN PANJANG

VOLUME DINDING BATU BATA / BATAKO - LUAS KUSEN - LUAS TIANG KOLOM

VOLUME DINDING BATU BATA / BATAKO


- Pas. Batu Bata HORISONTAL 79.95 M1
- Pas. Batu Bata VERTIKAL 66.35 M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1

LUAS KUSEN
- kusen Pintu 3.00 M1
- kusen Pintu M1
- kusen Pintu M1
- kusen Pintu Vent 3.00 M1
- kusen Pintu 1.50 M1
- kusen Pintu Vent 1.50 M1
- kusen Pintu 0.90 M1
- kusen Pintu Vent 0.90 M1
- kusen Pintu 0.90 M1
- kusen Pintu Vent 0.90 M1
- kusen Pintu 0.80 M1
- kusen Pintu Vent 0.80 M1
- kusen Pintu M1
- kusen Pintu M1

- kusen Jendela 2.45 M1


- kusen Jendela M1
- kusen Jendela Vent 2.45 M1
- kusen Jendela 1.15 M1
- kusen Jendela Vent 1.15 M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela M1
- kusen Jendela M1

- kusen Ventilasi 2.25 M1


- kusen Ventilasi 1.15 M1
- kusen Ventilasi M1
- kusen Ventilasi M1
- kusen M1

LUAS KOLOM DAN BALOK


- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Balok M1
- Balok M1
- Balok M1
- Balok M1

URAIAN PANJANG LEBAR


VOLUME LANTAI GRANIT POLISHED (HALUS)
- Keramik / Granit RG TGGU 2.85 M1 6.10
- Keramik / Granit RG TGGU 1.00 M1 2.60
- Keramik / Granit KE KM/WC 1.35 M1 1.35
- Keramik / Granit RG DISKUSI 3.35 M1 2.60
- Keramik / Granit LORONG 6.35 M1 1.10
- Keramik / Granit RG ALAT 1.35 M1 2.35
- Keramik / Granit SPOELHOCK 2.60 M1 3.85
- Keramik / Granit RG PERAWATAN 7.35 M1 3.00
- Keramik / Granit RG PERAWATAN 5.85 M1 12.60
- Keramik / Granit RG PERAWATAN 6.60 M1 3.00
- Keramik / Granit PENYIPANAN ALAT 2.85 M1 2.85
- Keramik / Granit PANTRI 2.85 M1 2.85
- Keramik / Granit AREA BERSIH 9.60 M1 1.35
- Keramik / Granit AREA BERSIH 2.25 M1 1.85
- Keramik / Granit ISTRAHAT DOKTER 2.10 M1 2.85
- Keramik / Granit LINEN 1.60 M1 2.10
- Keramik / Granit ISTRAHAT WANITA 2.85 M1 2.10
- Keramik / Granit ISTRAHAT PRIA 2.85 M1 2.10
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT UNPOLISHED (KASAR)
- Keramik / Granit TERAS 1.50 M1 3.65
- Keramik / Granit KE WC 1.35 M1 1.35
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME STEP NOSING UNPOLISHED (KASAR)
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI KERAMIK KM/WC
- Keramik Km/Wc 1.35 M1 1.35
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

VOLUME LANTAI KERAMIK DROP OFF


- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1

VOLUME LANTAI KERAMIK TAMAN


- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1

VOLUME LANTAI KERAMIK RAM DAN STEP


- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
URAIAN PANJANG

VOLUME DINDING KERAMIK KM/WC LANTAI 1


- Keramik Km/Wc 4.60 M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

URAIAN PANJANG

VOLUME BATU ALAM / TEMPEL LANTAI 1


- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1

URAIAN PANJANG

VOLUME PLINT GRANIT 1


- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1

- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1

LUAS LEBAR
URAIAN
VOLUME ATAS
COR BETON LANTAI KERJA
- 225.92 M2
- 7.30 M2
- 7.29 M2
- - M2

LUAS LEBAR
URAIAN
VOLUME ATAS
VOLUME PELESTERAN DINDING
- Pelesteran Dinding 455.92 M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

VOLUME PELESTERAN DINDING SUNDAP


- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

VOLUME PELESTERAN DINDING TERAS


- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

LEBAR
URAIAN PANJANG
ATAS
VOLUME PELESTERAN PONDASI
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PAVING BLOK
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME KANSTEEN
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1

LEBAR
URAIAN PANJANG
ATAS
COR RABAT KELILING
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1

PEKERJAAN PASANGAN DAN PELESTE


LANTAI 2

VOLUME DINDING BATU BATA / BATAKO - LUAS KUSEN - LUAS TIANG KOLOM

VOLUME DINDING BATU BATA / BATAKO


- Sundap trapesium Horisontal M1
- Sundap trapesium Vertikal M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- M1
- M1

LUAS KUSEN
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1

- Kusen Jendela M1
- Kusen Jendela Vent M1
- Kusen Jendela M1
- Kusen Jendela Vent M1

- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen M1
- Kusen M1
- Kusen M1

KOLOM
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT POLISHED (HALUS)
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT UNPOLISHED (KASAR)
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI KERAMIK KM/WC
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME DINDING KERAMIK KM/WC LANTAI 2
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME BATU ALAM / TEMPEL LANTAI 2
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PLINT GRANIT 2
- Plint Granit Dindinghorisontal M1
- Plint Granit Dindingvertikal M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1

- Plint Granit Kolom M1


- Plint Granit Kolom M1
- Plint Granit Kolom M1
- Plint Granit Kolom M1

LUAS LEBAR
URAIAN
VOLUME ATAS
VOLUME PELESTERAN DINDING
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

BETON STRUKTUR

LANTAI 1

URAIAN PANJANG

BETON CYCLOP 30 CM

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 30/45
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting 2 Kali Pakai M1

- Cor Beton M1

- Pelesteran Sloof Luar M1

- Acian Sloof Luar M1


UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 15/20
- Pembesian 86.50 M1 4.00
- Pembesian 75.00 M1 4.00
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
161.50 M1

- Besi Beugel 0.68 M1 1,076.67

- Bekisting 1 Kali Pakai 161.50 M1

- Cor Beton 161.50 M1

- Pelesteran 65.00 M1

- Acian 65.00 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 20/25
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -
- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 15/20
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 25/25
- Pembesian 94.60 M1 6.00
- Pembesian M1 6.00
- Pembesian M1
- Pembesian M1
- Pembesian M1
94.60 M1

- Besi Beugel 0.98 M1 630.67

- Besi Beugel M1 -

- Besi Beugel M1 -

- Bekisting 94.60 M1

- Bekisting M1
- Cor Beton 94.60 M1

- Cor Beton M1

- Pelesteran 81.40 M1

- Pelesteran M1

- Acian 81.40 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/15
- Pembesian 133.30 M1 4.00
- Pembesian M1 4.00
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
133.30 M1

- Besi Beugel 0.58 M1 888.67

- Besi Beugel M1 -

- Besi Beugel M1 -

- Bekisting 133.30 M1

- Bekisting M1

- Cor Beton 133.30 M1

- Cor Beton M1

- Pelesteran 114.70 M1

- Pelesteran M1

- Acian 114.70 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
URAIAN PANJANG
BATANG
KOLOM 25/40
- Pembesian 2.85 M1 8.00
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
2.85 M1

- Besi Beugel 1.28 M1 19.00

- Besi Beugel M1 -

- Besi Beugel M1 -

- Bekisting 2.85 M1

- Bekisting M1

- Cor Beton 2.85 M1

- Cor Beton M1

- Pelesteran 2.85 M1

- Pelesteran M1

- Acian 2.85 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 35/35
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Besi Beugel M1 -

- Besi Beugel M1 -
- Bekisting M1

- Bekisting M1

- Cor Beton M1

- Cor Beton M1

- Pelesteran M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/25
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1
- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 12/12
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/15
- Pembesian 83.00 M1 4.00
- Pembesian 73.00 M1 4.00
- Pembesian M1
- Pembesian M1
156.00 M1

- Besi Beugel 0.58 M1 1,040.00

- Bekisting 156.00 M1

- Cor Beton 156.00 M1

- Pelesteran 156.00 M1

- Acian 156.00 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/20
- Pembesian 5.50 M1 6.00
- Pembesian M1
- Pembesian M1
- Pembesian M1
5.50 M1

- Besi Beugel 0.68 M1 36.67

- Bekisting 4 Kali Pakai 5.50 M1

- Cor Beton 5.50 M1

- Pelesteran 5.50 M1

- Acian 5.50 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/25
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/20
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/50
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 25/45
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1
- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/25 CURVE
- Pembesian M1 2.00
- Pembesian M1 4.00
- Pembesian M1 2.00
- Pembesian M1 4.00
- Pembesian M1 2.00
- Pembesian M1 4.00
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
TANGGA

- Pembesian

- Pembesian

- Bekisting - M2

- Bekisting - M2

- Cor Beton - M2
- Cor Beton - M2

- Pelesteran - M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT TANGGA
BALOK TANGGA
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 M1
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 1

- Pembesian

- Bekisting - M2

- Cor Beton M2

- Pelesteran M1

- Acian M1

- Cat WaterProfing M1

- Serat Fiber M1

- Pipa Air hujan M1


- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 2 Kali Pakai - M1 -
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 2

- Pembesian

- Bekisting - M2

- Cor Beton - M2

- Pelesteran M1

- Acian M1

- Cat WaterProfing M1

- Serat Fiber M1

- Pipa Air hujan M1

- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 1.40 M1 -
- Bekisting 2 1.40 M1 -
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT TALANG PROFIL

- Pembesian

- Bekisting M2

- Cor Beton M2

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 M1
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 130/140 (14 TITIK)
- Pembesian Plat 1.3 M1
- Pembesian Plat 1.4 M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1
- Bekisting Foot M1

- Cor Beton Plat - M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 110/120 (4 TITIK)
- Pembesian Plat 1.1 M1
- Pembesian Plat 1.2 M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 125/125 (2 TITIK)
- Pembesian Plat 1.25 M1
- Pembesian Plat 1.25 M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 145/215 (6 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1
- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 105/195 (1 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

BETON STRUKTUR

LANTAI 2

JUMLAH
URAIAN PANJANG
BATANG
BALOK 20/35
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1
- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 30/45
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
PLAT LANTAI T = 12 CM

- Pembesian
- Bekisting - M1

- Cor Beton - M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT LANTAI
RUANG 1
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 3
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 4
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 5
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 6
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 7
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 8
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 - M1 -
- Bekisting 2 - M1 -
- Bekisting 3 - M1 -
- Bekisting 4 - M1 -
- Bekisting 5 - M1 -
- Bekisting 6 - M1 -
- Bekisting 7 - M1 -
- Bekisting 8 - M1 -

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
URAIAN PANJANG
BATANG
BALOK 15/25
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/20
- Pembesian Horisontal M1
- Pembesian Vertikal M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
PLAT JENDELA

- Pembesian
- Bekisting 5.92 M2

- Cor Beton 5.92 M2

- Pelesteran 14.80 M1
- Acian 14.80 M1

- Cat WaterProfing 14.80 M1

- Serat Fiber 14.80 M1

- Pipa Air hujan 10.00 M1

- Roof Drain 8.00 Bh


UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) 14.80 M1 2.67
- Panjang Besi Horisontal (X) 0.40 M1 98.67
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 14.80 M1 0.40
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT TERAS

- Pembesian

- Bekisting 9.89 M2

- Cor Beton 9.89 M2

- Pelesteran 4.30 M1

- Acian 4.30 M1

- Cat WaterProfing 4.30 M1

- Serat Fiber 4.30 M1


- Pipa Air hujan M1

- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) 4.30 M1 15.33
- Panjang Besi Horisontal (X) 2.30 M1 28.67
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 4.30 M1 2.30
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT DROP OFF T = 12 CM

- Pembesian

- Bekisting M1

- Cor Beton M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT LANTAI
RUANG 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 5
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1

JUMLAH
URAIAN PANJANG
BATANG
TEMPAT DUDUK BETON
- Pembesian 1.70 M1 8.00
- Pembesian 0.60 M1 22.67
- Pembesian M1
- Pembesian M1

- Bekisting 3.40 M1
- Bekisting M1

- Cor Beton 2.04 M1


- Cor Beton M1

- Pelesteran 3.60 M1
- Pelesteran M1

UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
COR PLAT BESI WIREMESH
- Wiremesh M1
- Wiremesh M1
- Wiremesh M1
- Wiremesh M1

- Cor Beton M1

- Bondek M1
UKURAN BESI WIREMESH M6 M7 M8 M9
BERAT / METER 3.070 4.170 5.450 6.900
UKURAN BESI BONDEK 0.75 0.8 1.0
BERAT / METER 6.950 7.400 9.500

JUMLAH
URAIAN PANJANG
BATANG
TIANG BAJA WF 350
- Tiang M1
- Tiang M1
- Tiang M1
- Tiang M1
- Tiang M1

ACCESSORIES

- Anchor Bolt L / U
- Base Plate M1
- Base Plate M1
- Base Plate M1
- Base Plate M1

- Rip 1 / Stifner M1
- Rip 2 / Stifner M1
- Rip 3 / Stifner M1
- Rip 4 Stifner M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BAJA WF 200
- Balok depan M1
- balok belakang M1
- balok M1
- balok SAMPING M1
- balok M1

BALOK POTONGAN BAJA WF 200


- Balok Tengah M1
- balok Belakang M1
- balok M1
- balok M1
- balok M1

ACCESSORIES
- Baut Mur Tengah
- Baut Mur Belakang
- Baut Mur

- Endplate tengah M1
- Endplate belakang M1
- Endplate M1
- Endplate M1

- Rip 1 / Stifner Tengah M1


- Rip 2 / Stifner Belakang M1
- Rip 3 / Stifner samping M1
- Rip 4 / Stifner M1
- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BAJA WF BB1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1

ACCESSORIES
- Baut Mur
- Baut Mur
- Baut Mur

- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

- Rip 1 M1
- Rip 2 M1
- Rip 3 M1
- Rip 4 M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1
UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9
BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK TERITISAN BAJA WF BB2
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1

ACCESSORIES
- Baut Mur
- Baut Mur
- Baut Mur

- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

- Rip 1 M1
- Rip 2 M1
- Rip 3 M1
- Rip 4 M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
GORDING KANAL C ATAS
- Gording Kanal C M1
- Gording Kanal C M1
- Gording Kanal C M1
- Gording Kanal C M1
- Gording Kanal C M1
UKURAN KANAL C 75.45.15.2,3 100.50.20.3,2 125.50.20.3,2
BERAT / METER 2.320 4.067 4.517

JUMLAH
URAIAN PANJANG
BATANG
KUDA-KUDA BESI SIKU 100.75.10
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT 60.60.6
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG 40.40.4
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 1
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980
JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 2
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 3
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

UKURAN PANJANG
URAIAN
KAYU ATAS
KONSTRUKSI KUDA-KUDA KAYU

BALOK KUDA-KUDA
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2

BALOK NOK / BUBUNGAN


- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2

BALOK JURAI
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2

BALOK SOKONG
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2

BALOK GAPIT
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2

BALOK TIANG GAPIT


- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2

SKUR ANGIN
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
UKURAN PANJANG
URAIAN
KAYU ATAS
KONSTRUKSI GORDING KAYU
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2

LEBAR
URAIAN PANJANG
ATAS
KONSTRUKSI ATAP / KAP LANTAI 1

TYPE TRAPESIUM
- Atap 8.40 M1 21.90
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE SEGITIGA
- Atap M1
- Atap 14.90 M1
- Atap 11.40 M1
- Atap 3.50 M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE PERSEGI PANJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE JAJARAN GENJANG


- Atap 3.50 M1 6.40
- Atap 1.00 M1 6.40
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

LEBAR
URAIAN PANJANG
ATAS
KONSTRUKSI ATAP / KAP LANTAI 2

TYPE TRAPESIUM
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE SEGITIGA
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE PERSEGI PANJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE JAJARAN GENJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

LEBAR
URAIAN PANJANG
ATAS
BUBUNGAN / NOK ATAP LANTAI 1
- Bubungan 8.40 M1
- Bubungan 6.40 M1
- Bubungan 1.00 M1
- Bubungan 6.00 M1
- Bubungan M1

BUBUNGAN / NOK ATAP LANTAI 2


- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1

LEBAR
URAIAN PANJANG
ATAS
LISTPLANK LANTAI 1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1

LISTPLANK LANTAI 2
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1

LEBAR
URAIAN PANJANG
ATAS
LANTAI 1

PLAFOND DALAM
- Plafond RG TGGU 2.85 M1 6.10
- Plafond RG TGGU 1.00 M1 2.60
- Plafond KE KM/WC 1.35 M1 1.35
- Plafond RG DISKUSI 3.35 M1 2.60
- Plafond LORONG 6.35 M1 1.10
- Plafond RG ALAT 1.35 M1 2.35
- Plafond SPOELHOCK 2.60 M1 3.85
- Plafond RG PERAWATAN 7.35 M1 3.00
- Plafond RG PERAWATAN 5.85 M1 12.60
- Plafond RG PERAWATAN 6.60 M1 3.00
- Plafond PENYIPANAN ALAT 2.85 M1 2.85
- Plafond PANTRI 2.85 M1 2.85
- Plafond AREA BERSIH 9.60 M1 1.35
- Plafond AREA BERSIH 2.25 M1 1.85
- Plafond ISTRAHAT DOKTER 2.10 M1 2.85
- Plafond LINEN 1.60 M1 2.10
- Plafond ISTRAHAT WANITA 2.85 M1 2.10
- Plafond ISTRAHAT PRIA 2.85 M1 2.10
- Plafond KM/WC 1.35 M1 1.35
- Plafond M1
- Plafond M1
- Plafond M1

PLAFOND LUAR
- Plafond 21.90 M1 1.00
- Plafond 20.90 M1 1.00
- Plafond 9.40 M1 1.00
- Plafond 1.00 M1 1.00
- Plafond 3.50 M1 1.00
- Plafond 12.90 M1 1.00
- Plafond M1
- Plafond M1
- Plafond M1

LEBAR
URAIAN PANJANG
ATAS
LANTAI 2

PLAFOND DALAM
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

PLAFOND LUAR
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

LEBAR
URAIAN PANJANG
ATAS
LIST PLAFOND 1
- List Plafond horisontal 133.75 M1
- List Plafond vertikal 103.50 M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1

LIST PLAFOND 2
- List Plafond 20.25 M1
- List Plafond 22.25 M1
- List Plafond 12.75 M1
- List Plafond 14.75 M1
- List Plafond 18.75 M1
- List Plafond 20.75 M1
- List Plafond 7.00 M1
- List Plafond 9.25 M1
- List Plafond 11.25 M1
- List Plafond M1
- List Plafond M1

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P1
- Kusen Pintu Kayu 0.010 M2 6.00
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu 0.700 M1 2.10


- Panil Pintu M1

- Cat Kusen 6.000 M1 0.25


- Cat Panil 0.700 M1 2.10

- Kusen Aluminium Ventilasi 4.500 M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca 0.650 M1 0.15


- Kaca 0.700 M1 0.40
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P1
- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P2
- Kusen Pintu Kayu 0.010 M2 5.40
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu 0.800 M1 2.10


- Panil Pintu M1

- Cat Kusen 5.400 M1 0.25


- Cat Panil 0.800 M1 2.10

- Kusen Aluminium Ventilasi 2.800 M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca 0.150 M1 0.65


- Kaca 0.800 M1 0.40
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P2

- Engsel Pintu
- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P6
- Kusen Pintu Kayu 0.010 M2 5.40
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu 0.800 M1 2.10


- Panil Pintu M1

- Cat Kusen 5.400 M1 0.25


- Cat Panil 0.800 M1 2.10

- Kusen Aluminium Ventilasi 2.800 M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca 0.150 M1 0.65


- Kaca 0.800 M1 0.40
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P6

- Engsel Pintu

- Grendel Pintu
- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
JENDELA J1
- Kusen Jendela Kayu M2
- Kusen Jendela Kayu M2
- Kusen Jendela Kayu M2

- Bingkai Jendela M1
- Bingkai Jendela M1

- Cat Kusen M1
- Cat Bingkai M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES J1

- Engsel Jendela

- Grendel Jendela

- Kunci Pintu 2 Slaag


- Gagang Jendela

- Hak Angin

UK. KAYU
URAIAN LEBAR
PANJANG
VENTILASI V1
- Kusen Ventilasi Kayu M2
- Kusen Ventilasi Kayu M2
- Kusen Ventilasi Kayu M2

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Cat Kusen M1
- Cat Bingkai M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES V1

- Engsel Jendela

- Grendel Jendela

- Kunci Pintu 2 Slaag

- Gagang Jendela
- Hak Angin

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P9
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Rel M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P9

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles


- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P6
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P6

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"
- Casement Ventilasi 8"

- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P7
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P7

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"


- Rambuncis

UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P8
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P8

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
ALUMINIUM

LANTAI 1

URAIAN PANJANG LEBAR

PINTU ALUMINIUM P1 2 BUAH


- Kusen Aluminium Pintu / Jendela 13.800 M1
- Kusen Aluminium Pintu / Jendela M1

- Kusen Aluminium Ventilasi 8.500 M1


- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1

- Bingkai Aluminium Ventilasi 1.900 M1 0.10


- Bingkai Aluminium Ventilasi 2.500 M1 0.10

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela 0.550 M1 0.50


- Kaca Jendela 0.850 M1 0.55
- Kaca Jendela M1

- Kaca Ventilasi 0.450 M1 0.30


- Kaca Ventilasi 0.750 M1 0.30

ACCESORIES P1

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"


- Rambuncis

LANTAI 1

PINTU ALUMINIUM P2 2 BUAH


- Kusen Aluminium Pintu / Jendela 2.450 M1
- Kusen Aluminium Pintu / Jendela 1.650 M1

- Kusen Aluminium Ventilasi 2.450 M1


- Kusen Aluminium Ventilasi 0.500 M1

- Bingkai Aluminium Jendela 1.550 M1 0.10


- Bingkai Aluminium Jendela 0.550 M1 0.10

- Bingkai Aluminium Ventilasi 0.400 M1 0.10


- Bingkai Aluminium Ventilasi 0.550 M1 0.10

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela 1.450 M1 0.45


- Kaca Jendela 0.300 M1 0.45

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES P2

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

PINTU ALUMINIUM P3 2 BUAH


- Kusen Aluminium Pintu / Jendela 6.350 M1
- Kusen Aluminium Pintu / Jendela M1

- Kusen Aluminium Ventilasi 3.800 M1


- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela 7.000 M1 0.10


- Bingkai Aluminium Jendela M1

- Bingkai Aluminium Ventilasi 3.600 M1 0.10


- Bingkai Aluminium Ventilasi M1

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela 1.150 M1 0.40


- Kaca Jendela M1

- Kaca Ventilasi 0.400 M1 0.30


- Kaca Ventilasi M1

ACCESORIES P3

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

PINTU ALUMINIUM P10 5 BUAH


- Kusen Aluminium 4.700 M1
- Kusen Aluminium M1

- Panil 0.700 M1 1.90


- Panil M1
ACCESORIES P10

- Gagang Pintu

- Engsel

- Grendel

LANTAI 1

PINTU ALUMINIUM P11 4 BUAH


- Kusen Aluminium 4.700 M1
- Kusen Aluminium M1

- Panil 0.700 M1 1.90


- Panil M1

ACCESORIES P11

- Gagang Pintu

- Engsel

- Grendel

URAIAN PANJANG LEBAR

LANTAI 1

JENDELA ALUMINIUM J1
- Kusen Aluminium Jendela 21.100 M1
- Kusen Aluminium Jendela 31.000 M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela 5.200 M1 0.10


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela 2.000 M1 0.75


- Kaca Jendela 1.250 M1 0.90
- Kaca Jendela 0.800 M1 0.90
- Kaca Ventilasi 0.850 M1 1.25
- Kaca Ventilasi 0.850 M1 0.85

ACCESORIES J1
- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J2
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J3
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J3

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J4
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J5
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J5

- Casement Jendela10"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J6
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J6

- Casement Jendela10"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J7
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1
- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J7

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J8
- Kusen Aluminium Jendela Pendek M1
- Kusen Aluminium Jendela Tinggi M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J8

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1
VENTILASI ALUMINIUM V1
- Kusen Aluminium Ventilasi 7.000 M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi 0.500 M1 0.40


- Kaca Ventilasi M1

ACCESORIES V1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V2
- Kusen Aluminium Ventilasi 3.800 M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi 3.600 M1 0.10


- Bingkai Aluminium Ventilasi M1 0.10

- Kaca Ventilasi 0.400 M1 0.30


- Kaca Ventilasi M1

ACCESORIES V2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V3
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V3

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V4
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

ALUMINIUM

LANTAI 2

URAIAN PANJANG LEBAR

PINTU ALUMINIUM P3 1 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Kusen Aluminium M1
- Kusen Aluminium M1

- Bingkai Aluminium M1
- Bingkai Aluminium M1
- Bingkai Aluminium M1
- Bingkai Aluminium M1

- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

ACCESORIES P1

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

PINTU ALUMINIUM P10 2 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1

ACCESORIES P10

- Gagang Pintu

- Engsel

- Grendel

LANTAI 2
PINTU ALUMINIUM P11 2 BUAH
- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1

ACCESORIES P11

- Gagang Pintu

- Engsel

- Grendel

LANTAI 2

JENDELA ALUMINIUM J4
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

JENDELA ALUMINIUM J6
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

VENTILASI ALUMINIUM V1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

VENTILASI ALUMINIUM V4
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LEBAR
URAIAN PANJANG
ATAS
EPOXY LANTAI

- M1
- M1
- M1
- M1
- M1

LEBAR
URAIAN PANJANG
ATAS
SEPTICTANK 2 BUAH

- Galian 2.2x1x1.5 2.20 M1 1.00

- Urugan Pasir 2.20 M1 1.00

- Pas. Batu Bata 8.50 M1

- Pelesteran 8.50 M1
Besi 10" Vertikal 2.00 M1 29.33
Besi 10" Horisontal 4.40 M1 13.33
- Besi 10"
- Bekisting 2.20 M1 1.00

- Cor Beton Bertulang 2.20 M1 1.00


- Cor Beton 2.20 M1 1.00

- Pipa PVC 2" 1.00 M1

PERESAPAN 2 BUAH

- Galian 1.25x1x1.15 1.25 M1 1.00

- Pipa PVC 3" 1.50 M1

- Urugan Batu Karang 1.25 M1 1.00

- Urugan Pasir 1.25 M1 1.00

- Urugan Kembali 1.25 M1 1.00

LEBAR
URAIAN PANJANG
ATAS
SALURAN AIR HUJAN

- Galian M1

- Cor Beton M1

- Pelesteran M1

- Acian M1

- Urugan Pasir M1

LEBAR
URAIAN PANJANG
ATAS
ALUCOPAN TYPE 1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 2
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 3
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

LEBAR
URAIAN PANJANG
ATAS
ALUCOPAN TYPE 4
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 5
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

URAIAN PANJANG

KUSEN PINTU BESI P1 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN PINTU BESI P2 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN JENDELA BESI J1 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN JENDELA BESI J2 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN VENTILASI BESI V1 UNP 100.50.5

- Kusen bawah M1
- Kusen tengah M1
- Kusen atas M1
- Kusen M1
- Kusen M1

KUSEN VENTILASI BESI V2 UNP 100.50.5

- Kusen bawah M1
- Kusen M1
- Kusen M1
- Kusen M1
UKURAN UNP 50.38.5 (6m) 75.40.5 (6m) 100.50.5 (6m)
BERAT / METER 5.000 7.550 9.367

JUMLAH
URAIAN PANJANG
BATANG
PROFIL DEPAN

- Pembesian

- Bekisting 16.72 M2

- Cor Beton 16.72 M2

- Pelesteran 16.72 M1

- Acian 16.72 M1

- Cat WaterProfing M1

- Serat Fiber M1

- Pipa Air hujan M1

- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) 0.40 M1 118.67
- Panjang Besi Horisontal (X) 17.80 M1 2.67
JENDELA 2
- Panjang Besi Vertikal (Y) 0.50 M1 128.00
- Panjang Besi Horisontal (X) 19.20 M1 3.33
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 0.40 M1 17.80
- Bekisting 2 0.50 M1 19.20
- Bekisting 3 M1
- Bekisting 4 M1
S BANGUNAN

LEBAR BUAH VOLUME

- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
JAAN PERSIAPAN

BUAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR TINGGI BUAH VOLUME

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

BUAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

N TANAH DAN PASIR

LEBAR TINGGI JUMLAH VOLUME

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR TINGGI JUMLAH VOLUME

38.76 M3
M1 0.40 M1 1.0 Bh 20.76 M3
M1 0.40 M1 1.0 Bh 18.00 M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
2.42 M3
M1 0.05 M1 0.20 M1 1.0 Bh 1.30 M3
M1 0.05 M1 0.20 M1 1.0 Bh 1.13 M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

M1 0.38 M1 1.0 Bh 2.00 M3


M1 0.38 M1 2.0 Bh 1.71 M3
M1 0.38 M1 2.0 Bh 1.71 M3
M1 0.43 M1 1.0 Bh 8.06 M3
M1 0.43 M1 1.0 Bh 1.18 M3
M1 0.43 M1 2.0 Bh 1.61 M3
M1 0.43 M1 1.0 Bh 4.14 M3
M1 0.43 M1 1.0 Bh 3.49 M3
M1 0.43 M1 2.0 Bh 3.23 M3
M1 0.43 M1 1.0 Bh 3.55 M3
M1 0.43 M1 1.0 Bh 8.71 M3
M1 0.43 M1 1.0 Bh 32.90 M3
M1 0.43 M1 1.0 Bh 10.00 M3
M1 0.43 M1 1.0 Bh 3.87 M3
M1 0.43 M1 1.0 Bh 3.87 M3
M1 0.43 M1 1.0 Bh 6.29 M3
M1 0.43 M1 1.0 Bh 1.94 M3
M1 0.43 M1 1.0 Bh 2.90 M3
M1 0.43 M1 1.0 Bh 1.69 M3
M1 0.43 M1 1.0 Bh 2.90 M3
M1 0.43 M1 1.0 Bh 2.90 M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

VOLUME

M3 100.00% 79.53 M3

M3 0.00% - M3
M3 0.00% - M3

79.53 M3

72.30 M3

108.64 M3

38.76 M3

2.42 M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3

12.72 M3
M1 0.05 M1 1.0 Bh 0.26 M3
M1 0.05 M1 2.0 Bh 0.23 M3
M1 0.05 M1 2.0 Bh 0.23 M3
M1 0.05 M1 1.0 Bh 0.94 M3
M1 0.05 M1 1.0 Bh 0.14 M3
M1 0.05 M1 2.0 Bh 0.19 M3
M1 0.05 M1 1.0 Bh 0.48 M3
M1 0.05 M1 1.0 Bh 0.41 M3
M1 0.05 M1 2.0 Bh 0.38 M3
M1 0.05 M1 1.0 Bh 0.41 M3
M1 0.05 M1 1.0 Bh 1.01 M3
M1 0.05 M1 1.0 Bh 3.83 M3
M1 0.05 M1 1.0 Bh 1.16 M3
M1 0.05 M1 1.0 Bh 0.45 M3
M1 0.05 M1 1.0 Bh 0.45 M3
M1 0.05 M1 1.0 Bh 0.73 M3
M1 0.05 M1 1.0 Bh 0.23 M3
M1 0.05 M1 1.0 Bh 0.34 M3
M1 0.05 M1 1.0 Bh 0.20 M3
M1 0.05 M1 1.0 Bh 0.34 M3
M1 0.05 M1 1.0 Bh 0.34 M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
4.85 M3
M1 0.05 M1 1.0 Bh 2.60 M3
M1 0.05 M1 1.0 Bh 2.25 M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

ANGAN DAN PELESTERAN

LEBAR TINGGI JUMLAH VOLUME

- M3
M1 0.25 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

24.23 M3
M1 0.25 M1 1.0 Bh 12.98 M3
M1 0.25 M1 1.0 Bh 11.25 M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 0.20 M1 - Bh - M3
M1 0.20 M1 - Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
30.28 M3
M1 0.50 M1 0.50 M1 1.0 Bh 16.22 M3
M1 0.50 M1 0.50 M1 1.0 Bh 14.06 M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

TINGGI JUMLAH VOLUME

455.92 M2

548.63 M2
3.75 M1 1.0 Bh 299.81 M2
3.75 M1 1.0 Bh 248.81 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

92.71 M2
2.15 M1 1.0 Bh 6.45 M2
M1 Bh - M2
M1 Bh - M2
0.50 M1 1.0 Bh 1.50 M2
2.15 M1 3.0 Bh 9.68 M2
0.50 M1 3.0 Bh 2.25 M2
2.15 M1 5.0 Bh 9.68 M2
0.50 M1 5.0 Bh 2.25 M2
2.15 M1 9.0 Bh 17.42 M2
0.50 M1 9.0 Bh 4.05 M2
1.90 M1 3.0 Bh 4.56 M2
1.90 M1 1.0 Bh 1.52 M2
M1 Bh - M2
M1 Bh - M2
M1
1.65 M1 3.0 Bh 12.13 M2
M1 Bh - M2
0.50 M1 3.0 Bh 3.68 M2
1.35 M1 4.0 Bh 6.21 M2
0.50 M1 4.0 Bh 2.30 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

0.50 M1 6.0 Bh 6.75 M2


0.50 M1 4.0 Bh 2.30 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR JUMLAH VOLUME


225.92 M2
M1 1.0 Bh 17.39 M2
M1 1.0 Bh 2.60 M2
M1 2.0 Bh 3.65 M2
M1 1.0 Bh 8.71 M2
M1 1.0 Bh 6.99 M2
M1 2.0 Bh 6.35 M2
M1 1.0 Bh 10.01 M2
M1 1.0 Bh 22.05 M2
M1 1.0 Bh 73.71 M2
M1 1.0 Bh 19.80 M2
M1 1.0 Bh 8.12 M2
M1 1.0 Bh 8.12 M2
M1 1.0 Bh 12.96 M2
M1 1.0 Bh 4.16 M2
M1 1.0 Bh 5.99 M2
M1 1.0 Bh 3.36 M2
M1 1.0 Bh 5.99 M2
M1 1.0 Bh 5.99 M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
7.30 M2
M1 1.0 Bh 5.48 M2
M1 1.0 Bh 1.82 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
7.29 M2
M1 4.0 Bh 7.29 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
TINGGI JUMLAH VOLUME

38.64 M2
2.10 M1 4.0 Bh 38.64 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

TINGGI JUMLAH VOLUME

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
16.84 M3
0.070 M1 1.0 Bh 15.81 M3
0.070 M1 1.0 Bh 0.51 M3
0.070 M1 1.0 Bh 0.51 M3
0.120 M1 1.0 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
934.63 M2
2.05 Bh 934.63 M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

ANGAN DAN PELESTERAN


- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

ON STRUKTUR

LEBAR TINGGI BUAH VOLUME

- M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 346.00 M1 0.89 Kg 307.25 Kg


Bh 300.00 M1 0.89 Kg 266.40 Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 573.65 Kg

Bh 732.13 M1 0.40 Kg 0.150 M 289.19 Kg

0.13 M1 21.53 M2

0.02 M2 3.29 M3

0.20 M1 13.00 M2

0.20 M1 13.00 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg
M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh 567.60 M1 0.89 Kg 504.03 Kg 6
Bh - M1 0.89 Kg - Kg
Bh - M1 Kg - Kg 6
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 504.03 Kg

Bh 618.05 M1 0.40 Kg 0.150 M 244.13 Kg

Bh - M1 Kg 0.150 M - Kg

Bh - M1 Kg 0.150 M - Kg

Total 244.13 Kg

0.33 M1 31.53 M2

M1 - M2

Total 31.53 M2
0.05 M2 4.58 M3

M2 - M3

4.58 M3

1.00 M1 81.40 M2

M1 - M2

Total 81.40 M2

1.00 M1 81.40 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh 533.20 M1 0.89 Kg 473.48 Kg 18
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg 18
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 473.48 Kg

Bh 515.43 M1 0.40 Kg 0.150 M 203.59 Kg

Bh - M1 Kg 0.150 M - Kg

Bh - M1 Kg 0.150 M - Kg

Total 203.59 Kg

0.20 M1 26.66 M2

M1 - M2

Total 26.66 M2

0.01 M2 1.92 M3

M2 - M3

1.92 M3

0.60 M1 68.82 M2

M1 - M2

Total 68.82 M2

0.60 M1 68.82 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh 22.80 M1 0.89 Kg 20.25 Kg 12
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg 14
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 20.25 Kg

Bh 24.32 M1 0.40 Kg 0.150 M 9.61 Kg

Bh - M1 Kg 0.150 M - Kg

Bh - M1 Kg 0.150 M - Kg

Total 9.61 Kg

1.18 M1 3.36 M2

M1 - M2

Total 3.36 M2

0.08 M2 0.23 M3

M2 - M3

0.23 M3

1.30 M1 3.71 M2

M1 - M2

Total 3.71 M2

1.30 M1 3.71 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 2
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg 2
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

Bh - M1 Kg 0.150 M - Kg

Bh - M1 Kg 0.150 M - Kg

Total - Kg
M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

- M3

M1 - M2

M1 - M2

Total - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 6
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 6
Bh - M1 Kg - Kg 10
Bh - M1 Kg - Kg 36
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg
Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 8
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 18
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.250 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 332.00 M1 0.89 Kg 294.82 Kg


Bh 292.00 M1 0.89 Kg 259.30 Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 554.11 Kg

Bh 603.20 M1 0.40 Kg 0.150 M 238.26 Kg

0.08 M1 12.48 M2

0.01 M2 2.25 M3

0.24 M1 37.44 M2

0.24 M1 37.44 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 33.00 M1 0.89 Kg 29.30 Kg


Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 29.30 Kg

Bh 24.93 M1 0.40 Kg 0.150 M 9.85 Kg

0.40 M1 2.20 M2

0.02 M2 0.11 M3

0.55 M1 3.03 M2

0.55 M1 3.03 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg
Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M1 Kg - Kg

- Kg

- M2

- M2

- M2

M1 - M3
M1 - M3

- M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2

M1 - M2

M1 - M2

Bh - M1
- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

- M1 - M2

- M1 - M2

- M1 - M2

Bh - M1

- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2
M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

- M2 - M3

- M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

ON STRUKTUR

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3
M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

- M1 Kg - Kg
- M2

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

78.93 M1 0.89 Kg 70.09 Kg


2.96 M2

0.10 M1 0.59 M3

1.00 M1 14.80 M2
1.00 M1 14.80 M2

1.00 M1 44.40 M2

M1 - M2

Bh - M1

8.00 Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
78.93 M1

Btg 1.00 Bh 39.47 M1


Btg 1.00 Bh 39.47 M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

5.92 M2

M1 1.00 Bh 5.92 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

131.87 M1 0.89 Kg 117.10 Kg

9.89 M2

0.12 M1 1.19 M3

4.60 M1 19.78 M2

4.60 M1 19.78 M2

2.30 M1 29.67 M2

2.30 M1 9.89 M2
Bh - M1

- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
131.87 M1

Btg 1.00 Bh 65.93 M1


Btg 1.00 Bh 65.93 M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

9.89 M2

M1 1.00 Bh 9.89 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

- M1 Kg - Kg

- M2

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1
Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 13.60 M1 0.62 Kg 8.39 Kg


Bh 13.60 M1 0.62 Kg 8.39 Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Total 16.78 Kg
0.60 M1 2.04 M2
M1 - M2
Total 2.04 M2
0.10 M2 0.20 M3
M2 - M3
Total 0.20 M3
0.80 M1 2.88 M2
M1 - M2
Total 2.88 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH TOT. PJG BERAT BESI JARAK
VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M2 - M3

M1 - M2
M10
8.510

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
125.50.20.3,2 150.50.20.3,2
4.517 4.967

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12 100.75.10
5.420 9.660 15.100 21.667 13.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12 100.75.10
5.420 9.660 15.100 21.667 13.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960
JUMLAH TOTAL BERAT
VOLUME
BATANG PANJANG BESI
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12
5.420 9.660 15.100 21.667
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12
5.420 9.660 15.100 21.667
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

PANJANG
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
PANJANG
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
372.12 M2

234.36 M2
M1 6.00 M1 2.0 Bh 234.36 M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2

102.56 M2
M1 Bh - M2
8.40 M1 1.0 Bh 62.58 M2
6.40 M1 1.0 Bh 36.48 M2
2.00 M1 1.0 Bh 3.50 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

35.20 M2
M1 1.0 Bh 22.40 M2
M1 2.0 Bh 12.80 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
53.40 M1
4.0 Bh 33.60 M1
2.0 Bh 12.80 M1
1.0 Bh 1.00 M1
1.0 Bh 6.00 M1
Bh - M1

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
302.81 M2

233.21 M2
M1 1.0 Bh 17.39 M2
M1 1.0 Bh 2.60 M2
M1 2.0 Bh 3.65 M2
M1 1.0 Bh 8.71 M2
M1 1.0 Bh 6.99 M2
M1 2.0 Bh 6.35 M2
M1 1.0 Bh 10.01 M2
M1 1.0 Bh 22.05 M2
M1 1.0 Bh 73.71 M2
M1 1.0 Bh 19.80 M2
M1 1.0 Bh 8.12 M2
M1 1.0 Bh 8.12 M2
M1 1.0 Bh 12.96 M2
M1 1.0 Bh 4.16 M2
M1 1.0 Bh 5.99 M2
M1 1.0 Bh 3.36 M2
M1 1.0 Bh 5.99 M2
M1 1.0 Bh 5.99 M2
M1 4.0 Bh 7.29 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

69.60 M2
M1 1.0 Bh 21.90 M2
M1 1.0 Bh 20.90 M2
M1 1.0 Bh 9.40 M2
M1 1.0 Bh 1.00 M2
M1 1.0 Bh 3.50 M2
M1 1.0 Bh 12.90 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
237.25 M1
1.0 Bh 133.75 M1
1.0 Bh 103.50 M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

137.00 M1
1.0 Bh 20.25 M1
1.0 Bh 22.25 M1
1.0 Bh 12.75 M1
1.0 Bh 14.75 M1
1.0 Bh 18.75 M1
1.0 Bh 20.75 M1
1.0 Bh 7.00 M1
1.0 Bh 9.25 M1
1.0 Bh 11.25 M1
Bh - M1
Bh - M1

LEBAR JUMLAH VOLUME

M1 3.0 Bh 0.17 M3
M1 Bh - M3
M1 Bh - M3
0.17 M3
M1 6.0 Bh 8.82 M2
M1 Bh - M2
8.82 M2
M1 3.0 Bh 4.50 M2
M1 12.0 Bh 17.64 M2
22.14 M2
3.0 Bh 13.50 M1
Bh - M1
13.50 M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 6.0 Bh 0.59 M2
M1 6.0 Bh 1.68 M2
M1 Bh - M2
2.27 M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU
Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Psg Bh - Psg

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR JUMLAH VOLUME

M1 5.0 Bh 0.26 M3
M1 Bh - M3
M1 Bh - M3
0.26 M3
M1 5.0 Bh 8.40 M2
M1 Bh - M2
8.40 M2
M1 5.0 Bh 6.75 M2
M1 10.0 Bh 16.80 M2
23.55 M2
5.0 Bh 14.00 M1
Bh - M1
14.00 M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 5.0 Bh 0.49 M2
M1 5.0 Bh 1.60 M2
M1 Bh - M2
2.09 M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh Bh - Bh
Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Psg Bh - Psg

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR JUMLAH VOLUME

M1 9.0 Bh 0.47 M3
M1 Bh - M3
M1 Bh - M3
0.47 M3
M1 9.0 Bh 15.12 M2
M1 Bh - M2
15.12 M2
M1 9.0 Bh 12.15 M2
M1 18.0 Bh 30.24 M2
42.39 M2
9.0 Bh 25.20 M1
Bh - M1
25.20 M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 9.0 Bh 0.88 M2
M1 9.0 Bh 2.88 M2
M1 Bh - M2
3.76 M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh 9.0 Bh - Bh

Bh 9.0 Bh - Bh
Bh 9.0 Bh - Bh

Bh 9.0 Bh - Bh

Psg 9.0 Bh - Psg

Bh 9.0 Bh - Bh

Bh 9.0 Bh - Bh

Bh 9.0 Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
Bh Bh - Psg

Bh - Bh

Bh - Bh

Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg
Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh
Bh - Bh - Bh

Bh - Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh
Bh - Bh - Bh

LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LUMINIUM

LEBAR JUMLAH VOLUME

1.0 Bh 13.80 M1
Bh - M1
Total 13.80 M1
1.0 Bh 8.50 M1
Bh - M1
Total 8.50 M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 2.0 Bh 0.38 M2
M1 2.0 Bh 0.50 M2
Total 0.88 M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 4.0 Bh 1.10 M2
M1 2.0 Bh 0.94 M2
M1 Bh - M2
Total 2.04 M2
M1 2.0 Bh 0.27 M2
M1 2.0 Bh 0.45 M2
Total 0.72 M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Psg Bh - Psg

Bh Bh - Bh

Bh Bh - Bh
Bh Bh - Bh

6.0 Bh 14.70 M1
15.0 Bh 24.75 M1
Total 39.45 M1
6.0 Bh 14.70 M1
15.0 Bh 7.50 M1
Total 22.20 M1
M1 24.00 Bh 3.72 M2
M1 24.00 Bh 1.32 M2
Total 5.04 M2
M1 24.00 Bh 0.96 M2
M1 24.00 Bh 1.32 M2
Total 2.28 M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 12.0 Bh 7.83 M2
M1 12.0 Bh 1.62 M2
Total 9.45 M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh 6.0 Bh - Bh

Bh 6.0 Bh - Bh

Bh 6.0 Bh - Bh

Bh 6.0 Bh - Bh

Bh 6.0 Bh - Bh

Psg 6.0 Bh - Psg

Bh Bh - Bh

Bh 6.0 Bh - Bh

Bh 6.0 Bh - Bh

4.0 Bh 25.40 M1
Bh - M1
Total 25.40 M1
4.0 Bh 15.20 M1
Bh - M1
Total 15.20 M1
M1 4.00 Bh 2.80 M2
M1 Bh - M2
Total 2.80 M2
M1 8.00 Bh 2.88 M2
M1 Bh - M2
Total 2.88 M2
M1 4.0 Bh - M2
M1 Bh - M2
Total - M2
M1 8.0 Bh 3.68 M2
M1 Bh - M2
Total 3.68 M2
M1 8.0 Bh 0.96 M2
M1 Bh - M2
Total 0.96 M2

Bh 4.0 Bh - Bh

Bh 4.0 Bh - Bh

Bh 4.0 Bh - Bh

Bh 4.0 Bh - Bh

Bh 4.0 Bh - Bh

Psg 4.0 Bh - Psg

Bh Bh - Bh

Bh 4.0 Bh - Bh

Bh 4.0 Bh - Bh

3.0 Bh 14.10 M1
Bh - M1
Total 14.10 M1
M1 3.0 Bh 3.99 M2
M1 Bh - M2
Total 3.99 M2
Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

1.0 Bh 4.70 M1
Bh - M1
Total 4.70 M1
M1 1.0 Bh 1.33 M2
M1 Bh - M2
Total 1.33 M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR JUMLAH VOLUME

1.0 Bh 21.10 M1
1.0 Bh 31.00 M1
Bh - M1
Bh - M1
Total 52.10 M1
M1 1.0 Bh 0.52 M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total 0.52 M2
M1 1.0 Bh 1.50 M2
M1 5.0 Bh 5.63 M2
M1 2.0 Bh 1.44 M2
M1 8.0 Bh 8.50 M2
M1 4.0 Bh 2.89 M2
Total 19.96 M2
Bh Bh - Bh

6.00 Bh Bh - Bh

3.00 Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 - Bh - M2
M1 Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
6.0 Bh 42.00 M1
Bh - M1
Total 42.00 M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 24.0 Bh 4.80 M2
M1 Bh - M2
Total 4.80 M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

4.0 Bh 15.20 M1
Bh - M1
Total 15.20 M1
M1 4.0 Bh 1.44 M2
M1 Bh - M2
Total 1.44 M2
M1 8.0 Bh 0.96 M2
M1 Bh - M2
Total 0.96 M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LUMINIUM

LEBAR JUMLAH VOLUME

Bh - M1
Bh - M1
Total - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 1.50 M1 2.0 Bh 6.60 M3

M1 0.05 M1 2.0 Bh 0.22 M3

1.50 M1 2.0 Bh 25.50 M2

1.50 M1 2.0 Bh 25.50 M2


Bh 58.67 M1 0.62 Kg 36.20 Kg
Bh 58.67 M1 0.62 Kg 36.20 Kg
Total 72.39 Kg
M1 2.0 Bh 4.40 M2

M1 0.10 M1 2.0 Bh 0.44 M3


M1 0.07 M1 2.0 Bh 0.31 M3

2.0 Bh 2.00 M1

M1 1.15 M1 2.0 Bh 2.88 M3

2.0 Bh 3.00 M1

M1 0.25 M1 2.0 Bh 0.63 M3

M1 0.25 M1 2.0 Bh 0.63 M3

M1 0.65 M1 2.0 Bh 1.63 M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 Bh - M2

M1 Bh - M2

M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

BERAT
JUMLAH VOLUME
BESI
- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
100.50.5 (6m) 125.65.6 (6m) 150.75.6,5 (6m) 180.75.7 (6m) 200.80.7,5 (6m)
9.367 13.400 18.667 21.333 24.667

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

222.93 M1 0.89 Kg 197.96 Kg

8.36 M2

0.12 M1 2.01 M3

2.00 M1 33.44 M2

2.00 M1 33.44 M2

17.80 M1 - M2

17.80 M1 - M2

Bh - M1

- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
222.93 M1

Btg 1.00 Bh 47.47 M1


Btg 1.00 Bh 47.47 M1
Btg 1.00 Bh 64.00 M1
Btg 1.00 Bh 64.00 M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

16.72 M2

M1 1.00 Bh 7.12 M2
M1 1.00 Bh 9.60 M2
M1 Bh - M2
M1 Bh - M2
3,000,000,000.00

#DIV/0! /m2
-
-

161.50

-
161.50

dikurangi dimensi kolom


9.60 kolom 40/50
3.36 kolom 30/40
12.96
17.32
548.63 tela 12
31.80 kusen
516.83 tela 12 - kusen

- tela 9
8.61 kusen
- 8.61 tela 9 - kusen
-

2.35
overstek sambungan
PANJANG TOTAL PANJANG

#REF!

overstek sambungan
PANJANG TOTAL PANJANG

161.50 - 161.50
0.007

overstek sambungan
PANJANG TOTAL PANJANG

157.45 157.45
81.40 81.40
81.40 81.40
81.40 81.40
81.40 81.40
81.40 81.40

overstek sambungan
PANJANG TOTAL PANJANG

36.80 36.80
60.30 60.30
60.30 60.30
60.30 60.30
overstek sambungan
PANJANG TOTAL PANJANG

36.80 36.80
60.30 60.30
60.30 60.30
60.30 60.30

overstek sambungan

PANJANG TOTAL PANJANG


6.55 6.55
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk
overstek sambungan

PANJANG TOTAL PANJANG


6.55 6.55
-
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk
tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk
overstek sambungan

PANJANG TOTAL PANJANG


6.55 6.55
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

overstek sambungan

PANJANG TOTAL PANJANG


6.55 6.55
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk
tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

overstek sambungan

PANJANG TOTAL PANJANG


5.00 5.00 2.50
- 2.50
- 2.50

overstek sambungan

PANJANG TOTAL PANJANG


5.00 5.00 2.50
- 2.50
- 2.50
overstek sambungan

PANJANG TOTAL PANJANG


5.00 5.00 2.50
- 2.50
- 2.50

overstek sambungan

PANJANG TOTAL PANJANG


5.00 5.00 2.50
- 2.50
- 2.50
overstek sambungan
PANJANG TOTAL PANJANG

152.25 152.25
140.10 140.10
140.10 140.10
140.10 140.10

497.45 -
-
-
-
- -
- -
- -
- -
- -
- -
- -
- -

overstek sambungan
PANJANG TOTAL PANJANG
152.25 1 153.25

overstek sambungan
PANJANG TOTAL PANJANG

497.45 1 498.45

overstek sambungan
PANJANG TOTAL PANJANG

- 1 1.00
overstek sambungan
PANJANG TOTAL PANJANG

- 1 1.00
- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
0.6 4 2.4
3.5 23 80.5
82.9
51.1493
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
-
-
-
-
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
luas WF
0.27 - -
0.27 - -
-

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m
33.35
kusen jeruji
0 0.4 -
0 0.4 -
0 0.4 -
- #REF! #REF!

0 0.4 0 #REF! #REF!


#REF!

#REF!

#REF!

#REF!

#REF!
15.00
-
-
15.00

15.00
(25.00)
(90.00)
(100.00)
20.00
-
-
20.00

45.00
-
-
45.00
JADWAL PELAKSANAAN PEKERJAAN
PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH KABUPATEN/KOTA
PROGRAM :
KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA
PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022
BOBOT BULAN I BULAN II BULAN III BULAN IV
NO URAIAN PEKERJAAN
% 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4
100%
I PEKERJAAN PERSIAPAN
1 Pek. Mobilisasi dan Demobilisasi 0.5838
2 Perlengkapan K3 dan Penanganan Covid 19 0.9825

3 Pek. Pengukuran dan Pemasangan Bouwplank 0.9991


4 Pek. Pembuatan Bak Adukan 0.0257
5 Pek. Papan Nama Proyek 0.0232
II PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Pondasi Batu Kali, Panjang 161,50 m 0.3039

2 Pek. Urugan Kembali Galian Batu Kali, Panjang 161,50 m 0.0136


3 Pek. Urugan Tanah Bawah Lantai 0.6151

4 Pek. Urugan Pasir Bawah Lantai 0.3217


5 Urugan Pasir Bawah Pondasi Batu Kali, Panjang 161,50 m 0.1227
III PEKERJAAN PASANGAN DAN PELESTERAN

1 Pek. Pondasi Batu Kosong, Panjang 161,50 m 1.3920


2 Pek. Pondasi Batu Kali, Camp. 1 : 4, Panjang 161,50 m 3.2872
3 Pek. Dinding Batu Bata 1/2 Bt 1 : 5 cm 6.8209
4 Pek. Lantai Granit 60 x 60 Cm, Polished 5.6510
5 Pek. Lantai Granit 60 x 60 Cm, UnPolished 0.1975

6 Pek. Plint Granit 10 x 60 Cm 1.9501


7 Pek. Step Nosing Granit 30 x 60 Cm, UnPolished 0.1744

8 Pek. Pas. Lantai Toilet Keramik 30 x 30 Cm Kasar 0.1330 90%

9 Pek. Pas. Dinding Keramik Km/Wc 30 x 30 x 210 Cm, Polished 0.6167


10 Pek. Pelesteran Dinding dan Pondasi, Camp. 1 : 5 Tebal 15 mm 6.4206

11 Pek. Acian Dinding dan Pondasi 3.8876


IV PEKERJAAN STRUKTUR BETON

1 Pek. Sloof Type 1, 15/20


- Pembesian 4 Ø 12" 0.9521
- Besi Beugel Ø 8" - 15 0.5125

- Bekisting Papan 3 Kali Pakai 0.4183


- Cor Beton K250 0.4337
- Pelesteran 1 : 5 Tebal 15 mm (Bagian Luar) 0.0956
- Acian (Bagian Luar) 0.0569
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0318

2 Pek. Kolom Type 1, 25/25


- Pembesian 6 Ø 12" 0.8366
- Besi Beugel Ø 8" - 15 0.4327
- Bekisting Plywood/Multipleks 3 Kali Pakai 1.0176
- Cor Beton K250 0.6038

- Pelesteran 1 : 5 Tebal 15 mm 0.5985


- Acian 0.3562
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.1991
3 Pek. Kolom Type 2, 25/40
- Pembesian 8 Ø 12" 0.0336

- Besi Beugel Ø 8" - 15 0.0170


- Bekisting Plywood/Multipleks 1 Kali Pakai 0.1084
- Cor Beton K250 0.0303
- Pelesteran 1 : 5 Tebal 15 mm 0.0273
- Acian 0.0162

- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0091


4 Pek. Kolom Type 3, 15/15

80%
- Pembesian 4 Ø 12" 0.7859

- Besi Beugel Ø 8" - 15 0.3608 80%

- Bekisting Plywood/Multipleks 3 Kali Pakai 0.8604


- Cor Beton K250 0.2531
- Pelesteran 1 : 5 Tebal 15 mm 0.5060
- Acian 0.3012

- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.1684


5 Pek. Balok Type 1, 15/15
- Pembesian 4 Ø 12" 0.9197
- Besi Beugel Ø 8" - 15 0.4223
- Bekisting Plywood/Multipleks 3 Kali Pakai 0.4115

- Cor Beton K250 0.2966


- Pelesteran 1 : 5 Tebal 15 mm 0.2753
- Acian (Bagian Luar) 0.1638
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0916
6 Pek. Balok Type 2, 15/15

- Pembesian 4 Ø 12" 0.9197


- Besi Beugel Ø 8" - 15 0.4223
- Bekisting Plywood/Multipleks 3 Kali Pakai 0.4115
- Cor Beton K250 0.2966
- Pelesteran 1 : 5 Tebal 15 mm 0.2753

- Acian (Bagian Luar) 0.1638


- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0916

7 Pek. Balok Type 3, 15/20


- Pembesian 6 Ø 12" 0.0486 70%

- Besi Beugel Ø 8" - 15 0.0175

- Bekisting Plywood/Multipleks 3 Kali Pakai 0.0725


- Cor Beton K250 0.0145

- Pelesteran 1 : 5 Tebal 15 mm 0.0223


- Acian (Bagian Luar) 0.0133
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0074

8 Pek. Dak Beton Pintu dan Jendela


- Pembesian Ø 12" - 15 (1 Layer) 0.1163
- Bekisting Plywood/Multipleks 2 Kali Pakai 0.1134
- Cor Beton K250 0.0778
- Pelesteran 1 : 5 Tebal 15 mm 0.1088

- Acian 0.0648
- Pek. 2 Lapis Cat Waterproof 0.2027

9 Pek. Plat Dak Beton (Teras)


- Pembesian Ø 12" - 15 (1 Layer) 0.1944
- Bekisting Plywood/Multipleks 3 Kali Pakai 0.3788

- Cor Beton K250 0.1569


- Pelesteran 1 : 5 Tebal 15 mm 0.1454

- Acian 0.0866
- Serat Fiber Lebar 85 Cm 0.0218
- Pek. 2 Lapis Cat Waterproof Lebar 85 Cm 0.1355

10 Pek. Profil Beton (Depan)


- Pembesian Ø 12" - 15 (1 Layer) 0.3286
- Bekisting Plywood/Multipleks 2 Kali Pakai 0.3202
- Cor Beton K250 0.2650
- Pelesteran 1 : 5 Tebal 15 mm 0.5536

- Acian 0.3295
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.1842
11 Pek. Cor Beton K200 Lantai Kerja 7 Cm 2.1280
12 Pek. Cor Rabat K200 Keliling Bangunan 10 Cm 0.8719
13 Pek. Plat Meja Beton (Rg. Spoelhoek dan Pantri) 60%

- Pembesian Ø 10" - 15 (1 Layer) 0.0289


- Bekisting Plywood/Multipleks 3 Kali Pakai 0.0912
- Batu Bata 1/2 Bata 1 : 5 0.0209
- Cor Beton K250 0.0264
- Pelesteran 1 : 5 Tebal 15 mm 0.0206

- Acian 0.0123
- Keramik 30 x 30 Cm Kasar 0.0249
- Pek. 1 Lapis Plamur + 3 Lapis setara Metrolite 0.0068
- Kitchen Zync Stainless Steel (Single) 0.4221
V PEKERJAAN BESI DAN ALUMUNIUM

1 Pek. Kuda-Kuda Baja Ringan Taso C.75.100 5.8622


2 Pek. Rangka Plafond Besi Hollow 40.40.0,5 mm, Modul 60/60 6.3180
3 Pek. Atap Spandek Zincalume Berpasir 0,40 mm 4.2925
4 Pek. Nok Atap Seng Berpasir 0.5525
5 Pek. Plafond Tripleks 4 mm 1.5873

6 Pek. List Plafond Kayu Profil 1.0888


7 Pek. Listplank Kayu Kelas II 0.5187
8 Pek. Pintu Type P1, 1 Buah
- Kusen Pintu Aluminium Putih 4" 0.0897
- Panil Pintu Kaca Tempered 12 mm 0.1991
50%
- Penjepit Kaca Atas 0.0581
- Penjepit Kaca Bawah 0.0581
- Gantungan Pintu Kaca Atas 0.0191
- Gantungan Pintu Kaca Bawah 0.1545
- Kunci Pintu Kaca 0.0554

- Door Pull Pintu Kaca Stainless (80 cm) 0.0687


- Kusen Jendela dan Ventilasi Aluminium Putih 4" 0.3479
- Bingkai Ventilasi Aluminium Putih 4" 0.0567
- Kaca Jendela dan Ventilasi Bening 5 mm 0.0488
- Engsel Ventilasi Casement 8" 0.0542

- Gagang Ventilasi Rambuncis 0.0200


9 Pek. Jendela Type J1, 3 Buah

- Kusen Jendela dan Ventilasi Aluminium Putih 4" Alexindo 0.9619


- Bingkai Jendela dan Ventilasi Aluminium Putih 4" 0.4717
- Kaca Jendela dan Ventilasi Bening 5 mm 0.1670

- Engsel Jendela Casement 10" 0.1752


- Engsel Ventilasi Casement 8" 0.1627

- Gagang Jendela dan Ventilasi Rambuncis 0.1203


10 Pek. Jendela Type J2, 4 Buah
- Kusen Jendela dan Ventilasi Aluminium Putih 4" Alexindo 0.6335

- Bingkai Jendela dan Ventilasi Aluminium Putih 4" 0.3660 40%

- Kaca Jendela dan Ventilasi Bening 5 mm 0.0820


- Engsel Jendela Casement 10" 0.1168
- Engsel Ventilasi Casement 8" 0.1085
- Gagang Jendela dan Ventilasi Rambuncis 0.0802

11 Pek. Ventilasi Type V1, 6 Buah


- Kusen Ventilasi Aluminium Putih 4" Alexindo 0.6553

- Kaca Ventilasi Bening 5 mm 0.0848


12 Pek. Jendela Type V2, 4 Buah
- Kusen Ventilasi Aluminium Putih 4" Alexindo 0.2372

- Bingkai Ventilasi Aluminium Putih 4" 0.0928


- Kaca Ventilasi Bening 5 mm 0.0170

- Engsel Ventilasi Casement 8" 0.1085


- Gagang Ventilasi Rambuncis 0.0401
13 Pek. Pintu Toilet Type P5 (Buka Kanan), 3 Buah

- Kusen Pintu Aluminium Coat Putih 4" Alexindo 0.2200


- Pintu Aluminium Strip Coat Putih 0.2935
- Gagang Pintu Km/Wc Bulat Plastik 0.0125
- Engsel Pintu Aluminium 0.0391
- Grendel Pintu Km/Wc 0.0283

14 Pek. Pintu Toilet Type P6 (Buka Kanan), 1 Buah


- Kusen Pintu Aluminium Coat Putih 4" Alexindo 0.0733
- Pintu Aluminium Strip Coat Putih 0.0978
- Gagang Pintu Km/Wc Bulat Plastik 0.0042
- Engsel Pintu Aluminium 0.0130

- Grendel Pintu Km/Wc 0.0094


15 Pek. Panel Dinding Aluminium Kaca
- Kusen Pintu Aluminium Coat Putih 4" Alexindo 0.8129
- Pintu Aluminium Coat Putih 4" Alexindo 0.0335
- Kunci Pintu Aluminium 0.0554

- Door Pull Pintu Stainless (60 cm) 0.0511


- Engsel Pintu Aluminium 0.0130 30%

- Kaca Bening 5 mm 0.3527


VI PEKERJAAN KAYU
30%

1 Pek. Pintu Type P2 Double Door, 3 Buah

- Kusen Pintu Kayu 6/16 Kelas II 0.1093


- Pintu Panil Kayu Kelas II 0.6160
- Engsel Pintu Kualitas Baik 0.0672
- Silinder Kunci Pintu 2 Slaag 0.0185
- Handle Pintu Stainless 60 Cm 0.0511

- Kaca Bening 8 mm 0.0535


- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) 0.1211
- Grendel Pintu 0.0123
- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo 0.2106
2 Pek. Pintu Type P3 Single Door / Buka Kanan, 5 Buah

- Kusen Pintu Kayu 6/16 Kelas II 0.1672


- Pintu Panil Kayu Kelas II 0.5866
- Engsel Pintu Kualitas Baik 0.1680
- Kunci Pintu 2 Slaag setara Yale 0.1365
- Kaca Bening 8 mm 0.0492

- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) 0.1288


- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo 0.2184
3 Pek. Pintu Type P4 Single Door / Buka Kiri, 9 Buah
- Kusen Pintu Kayu 6/16 Kelas II 0.3022
- Pintu Panil Kayu Kelas II 1.0559 20%

- Engsel Pintu Kualitas Baik 0.3024


- Kunci Pintu 2 Slaag setara Yale 0.2456

- Kaca Bening 8 mm 0.0886


- 1 Lapis Meny + 3 Lapis Cat Kayu (Nippon Platone) 0.2318
- Kusen Ventilasi Aluminium Coat Putih 4" Alexindo 0.3932

VII PEKERJAAN INSTALASI LISTRIK


1 Pas. Boks Panel Listrik 3 Phase Komplit 0.4568

2 Pek. Pas. Titik Lampu dan Sakelar (Tanam dalam Dinding) 0.3020
3 Pek. Pas. Titik Stop Kontak (Tanam dalam Dinding) 0.1611
4 Pek. Pas. Titik AC (Tanam dalam Dinding) 0.1208

5 Pek. Pas. MCB Jalur Titik dan AC 0.1510


6 Pek. Pas. Lampu LED RM 2 x 18 Watt Merk Phillips 0.2379
7 Pek. Pas. Lampu Downlight LED 9 Watt Merk Phillips 0.0564
8 Pek. Pas. Lampu Downlight LED 23 Watt Merk Phillips 0.1942
9 Pek. Pas. Sakelar 2 Gang Merk Panasonic Fluorescence 0.0470

10 Pek. Pas. Sakelar 3 Gang Merk Panasonic Fluorescence 0.0614


11 Pek. Pas. Stop Kontak Dinding 2 Gang Merk Panasonic Schuko 0.1120

12 Pek. Pas. Exchaust Fan 0.1784


13 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, Lampu dan Sakelar 0.2014
14 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, AC 0.2014

15 Kabel Inst. Merk Eterna NYM 2 x 2,5 mm, Stop Kontak 0.2014
VIII PEKERJAAN SANITASI DAN PIPA

1 Pek. Pipa Inst. Air Bersih (PPR 1/2") 0.1289


2 Pek. Pipa Air Kotor (PVC AW 4") dari Km/Wc ke IPAL 0.3595
3 Pek. Pipa Closed (PVC AW 4") ke Septictank 0.3268

4 Pek. Closed Duduk Toto + Jet Spray Komplit 1.3908


5 Pek. Pegangan Km/Wc Stainless 0.1253
6 Pek. Kran Air Km/Wc Toto 0.1112
7 Pek. Floor Drain Stainless Merk Onda 0.0768
8 Pek. Septictank (2,3x1x1,5m), 2 Buah

- Pek. Galian Tanah 0.0517 10%

- Urugan Pasir 0.0056


- Pas. Batu Bata 1 : 3 0.4006
- Pelesteran Dinding 1 : 3 0.1979
- Besi Ø 10 -15 mm (2 Layer) 0.1245

- Bekisting 0.1685
- Cor Beton Bertulang K 250, T = 10 Cm 0.0580
- Cor Beton K 250, T = 7 Cm 0.0409
- Pas. Pipa PVC Ø 2" (Penghawaan) 0.0123
9 Pek. Peresapan (1.25x1x1.15m), 2 Buah

- Pek. Galian Tanah 0.0226


- Pas. Pipa PVC Ø 3" (dilubangi) 0.0334
- Urugan Batu Karang 0.0362
- Urugan Pasir 0.0159
- Urugan Kembali 0.0092

PEKERJAAN PENGECATAN
1 Pek. 1 Lapis Plamur + 3 Lapis Cat Dinding dan Pondasi setara Metrolite 2.1732
PEKERJAAN AKHIR
1 Pemb. Laporan dan Backup Data 0.1649
2 Pemb. Asbuilt Drawing 0.1827

3 Pek. Pembersihan Akhir 0.1827 0%


A JUMLAH 100.0000 WAKTU PELAKSANAAN 120 (SERATUS DUA PULUH) HARI KALENDER

RENCANA KEMAJUAN PEKERJAAN ( % )


B
KOMULATIF RENCANA KEMAJUAN PEKERJAAN ( % )
C KOMULATIF REALISASI KEMAJUAN PEKERJAAN (%)

D DEVIASI ( % )

SALAKAN, MEI 2022


DIBUAT OLEH :
CV. KAUTSAR
Engineering Consultant

MUHAMMAD TRIMUKTI, ST
Direktur
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35 1
36 2
37 3
38 4
39 5
40 6
41 7
42 8
43 9
44 10
45 11
46 12
47 13
48 14
49 15
50 16
51 17
52 18
53 19
54 20
55 21
56 22
57 23
58 24
59 25
60 26
61 27
62 28
63 29
64 30
65 31
66 32
67 33
68 34
69 35
70 36
71 37
72 38
73 39
74 40
75 41
76 42
77 43
78 44
79 45
80 46
81
82
83
84
85
86
87 28 56 84
88 27
89 26
90 25
91 24
92 23
93 22
94 21
95 20
96 19
97 18
98 17
99 16
100 15
101 14
102 13
103 12
104 11
105 10
106 9
107 8
108 7
109 6
110 5
111 4
112 3
113 2
114 3232 1

28.5 31
50
62
93
124

37
50
DAFTAR HARGA BAHAN DAN UPAH KERJA
KABUPATEN BANGGAI KEPULAUAN
TAHUN ANGGARAN 2022
PROGRAM : PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN DAERAH
KABUPATEN/KOTA
PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA
KEGIATAN :
PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

UPAH KERJA
1 Buruh / Pekerja Orang/Hari 100,000.00 14,285.71 Jam
2 Tukang Batu, Tukang Besi, Tukang Kayu Orang/Hari 145,000.00 20,714.29 Jam
3 Kepala Tukang Orang/Hari 170,000.00 24,285.71 Jam
4 Mandor Orang/Hari 120,600.00 17,228.57 Jam
BAHAN / MATERIAL

BAHAN ATAP
1 Aluminium Foil (Bubble) 1.2 x 25 Cm (T = 4 mm) 2 Sisi + PE Bubble lbr 1,260,000.00 42,000.00 M2
2 Atap Aspal Sheet/Onduline lbr 101,800.00
3 Atap Genteng Metal T = 0,25 mm Sakura Roof Lbr 47,200.00
4 Atap Genteng Zincalumb Type USR Unico Single Rib M2 146,400.00
5 Atap Genteng Minimalis Elegant Berpasir Amber Platinum Lbr 73,500.00
7 Atap Alderon R830 Bluedoff Lebar 830 Cm M1 201,600.00
8 Atap Spandeck Zincalumb Tebal 0.40 Lbr 120,700.00
9 Atap Spandeck Zincalumb Warna Berpasir Tebal 0.40 Lbr 131,200.00
10 Dynabolt 10 x 77 Bh 6,300.00
11 Lisplangk GRC 20 ( pjg 3 mtr ) Lbr 84,000.00
12 Listplank GRC 30mm Lbr 84,000.00
13 Nok Zyncalume Berpasir bh 46,200.00
14 Nok Sakura Roof bh 36,700.00
15 Nok Genteng Metal bh 26,200.00
16 Nok Zincalume Bh 27,300.00
17 Nok Alderon Bh 144,900.00
18 Sakura Roof 2 Susun Lbr 34,600.00
19 Screw 1" Bh 1,000.00
20 Screw 4.5 Cm Untuk Atap Bh 500.00
21 Screw Cteks 10 x 16-16 ( Reng ) Bh 500.00
22 Screw Cteks 12-14 x 20 ( Canal ) Bh 500.00
23 Seng Gelombang BJLS 0.20 180 x 80 Cm Lbr 54,600.00
24 Seng Gelombang BJLS 0.25 180 x 80 Cm Lbr 73,500.00
25 Seng Plastik Gelombang Besar Go Green Lbr 42,000.00
26 Seng Plat BJLS 0.20 Mtr 49,300.00
27 Seng Plat BJLS 0.30 Putih Mtr 8,400.00
28 Seng Plat BJLS 0.40 Putih Mtr 10,500.00
29 Seng Plat lebar 30 cm m1 13,600.00
30 Seng Plat Lebar 45 cm m1 18,900.00
31 Seng Plat lebar 90 cm lbr 68,200.00
32 Taso ( 6 Mtr ) Btg 86,100.00
33 Truss C 75 x 0.75 mm ( 6 mtr ) Taso Btg 99,700.00
NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

34 Truss C 75 x 1.00 mm ( 6 mtr ) Taso Btg 142,800.00


35 Truss R 32.45 Btg 57,700.00
BATUAN / PASIR / KERIKIL/ TANAH
1 Bataco 12 cm Bh 4,200.00
2 Bataco 7 cm Bh 2,800.00
3 Bataco 9 cm Bh 3,300.00
4 Batu Alam Acak Jember M2 294,200.00 23,536.00 Bh
5 Batu Alam Alur Andesit 15 x 30 cm M2 294,200.00 13,372.73 Bh
6 Batu Alam Alur Andesit 20 x 40 cm M2 294,200.00 23,536.00 Bh
7 Batu Alam Alur Candi 20 x 40 cm M2 294,200.00 23,536.00 Bh
8 Batu Alam Alur Cukil 20 x 40 cm M2 294,200.00 23,536.00 Bh
9 Batu Alam Andesit Bintik 15 x 30 cm M2 294,200.00 13,372.73 Bh
10 Batu Alam Andesit Bintik 20 x 40 cm M2 294,200.00 23,536.00 Bh
11 Batu Alam Andesit Cukil 10 x 20 cm M2 294,200.00 5,884.00 Bh
12 Batu Alam Andesit Cukil 20 x 40 cm M2 294,200.00 23,536.00 Bh
13 Batu Alam Andesit Kupu-kupu 15 x 30 cm M2 294,200.00 13,372.73 Bh
14 Batu Alam Andesit Kupu-kupu 20 x 40 cm M2 294,200.00 23,536.00 Bh
15 Batu Alam Bobos 3 x 40 cm M2 294,200.00 3,544.58 Bh
16 Batu Alam Candi 30 x 30 x 5 cm M2 294,200.00 26,745.45 Bh
17 Batu Alam Candi Cukil 15 x 30 cm M2 294,200.00 13,372.73 Bh
18 Batu Alam Cetak Semen 20 x 40 cm M2 294,200.00 23,536.00 Bh
19 Batu Alam Kotak Jember 10 x 20 cm M2 294,200.00 5,884.00 Bh
20 Batu Alam Marmo Bakar 10 x 20 cm M2 294,200.00 5,884.00 Bh
21 Batu Alam Marmo Bakar 15 x 30 cm M2 294,200.00 13,372.73 Bh
22 Batu Alam Marmo Bakar 20 x 40 cm M2 294,200.00 23,536.00 Bh
23 Batu Alam Marmoria 10 x 20 cm M2 294,200.00 5,884.00 Bh
24 Batu Alam Palimanan M2 294,200.00
25 Batu Alam Palimanan 15 x 30 cm M2 294,200.00 13,372.73 Bh
26 Batu Alam Palimanan 20 x 20 cm M2 294,200.00
27 Batu Alam Paras 15 x 30 cm M2 294,200.00 13,372.73 Bh
28 Batu Alam Paras Alur M2 294,200.00 23,536.00 Bh
29 Batu Alam Uk. 20 x 40 cm M2 294,200.00 23,536.00 Bh
30 Batu Bata 12 cm Bh 1,000.00
31 Batu Bata 9 cm Bh 800.00
32 Batu Bata 7 cm Bh 600.00
33 Bata / Beton Rooster 20 x 20 Cm Bh 12,600.00
34 Bata Ringan (Hebel) 10 x 20 x 60 Cm Bh 9,900.00 825,000.00 M3
35 Bata Ringan (Hebel) 7.5 x 20 x 60 Cm Bh 8,400.00 700,000.00 M3
36 Batu Kali / Batu Gunung / Batu Belah M3 288,700.00
37 Batu Pecah 0,5 - 1 cm / Split M3 341,200.00
38 Batu Pecah 1 - 2 cm M3 341,200.00
39 Batu Pecah 2 - 3 cm M3 341,200.00
40 Batu Pecah 3 - 5 cm M3 341,200.00
41 Batu Pecah 5 - 7 cm M3 341,200.00
42 Pasir Beton Stone Crusher M3 294,000.00
43 Conblock HB20 bh 6,800.00
44 Conblock HB15 bh 5,700.00
45 Kanstin 40 x 15 x 28 Cm Beton K250 bh 57,700.00
46 Kapur M3 241,500.00
47 Kerikil Pilihan M3 294,000.00 217.78 Kg
48 Kerikil Sungai Tak Tersaring M3 210,000.00
49 Kerikil Sungai Tersaring M3 288,700.00
50 Material Pilihan m3 131,200.00
51 Material Timbunan M3 47,200.00
52 Pasir Pasang/Pasir Beton M3 279,300.00 199.50 Kg
53 Pasir Urug M3 183,700.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

54 Paving Blok Bata 21 x 10.5 x 6 cm Mutu Beton K250 m2 161,700.00 3,675.00 Bh


55 Paving Blok Bata 21 x 10.5 x 8 cm Mutu Beton K250 m2 170,900.00 3,884.09 Bh
56 Sirtu M3 315,000.00
57 Tanah Humus M3 315,000.00
SEMEN
1 Aspal Drum 2,100,000.00
2 Aspal semen ( Grade 60/70) Kg 16,100.00
3 Mortar Perekat Bata Ringan dan Pelesteran MU380 40 Zak 152,200.00 3,805.00 Kg
4 Semen Portland 50 Zak 94,500.00 1,890.00 Kg
5 Storox 100 Kg 50,400.00
6 Semen Warna BlackBull Kg 15,200.00
7 Semen Warna Blackbull Zak 609,000.00
MATERIAL BESI / BAJA / KAWAT
1 Besi / Baja Profil WF Kg 18,500.00
2 Besi Baja CNP Kg 15,400.00
3 Besi beton Diameter 6 mm SNI Btg 42,650.00 16,009.76 Kg
4 Besi beton Diameter 8 mm SNI Btg 69,550.00 14,673.00 Kg
5 Besi beton Diameter 10 mm SNI Btg 105,000.00 14,181.52 Kg
6 Besi beton Diameter 12 mm SNI Btg 145,000.00 13,607.36 Kg
7 Besi beton Diameter 14 mm SNI Btg 196,000.00 13,498.62 Kg
8 Besi beton Diameter 16 mm SNI Btg 269,000.00 14,205.75 Kg
9 Besi Beton Polos/Baja Tulangan Beton Kg 18,600.00
10 Besi Beugel/Baut Bh 1,000.00
11 Besi Hollow 40 x 40 (1.70 mm) Btg 173,200.00 28,866.67 M
12 Besi Hollow 20 x 40 (1.70 mm) Btg 146,600.00 24,433.33 M
13 Besi Hollow Galvanis 40 x 40 (1.0 mm) Btg 136,500.00 22,750.00 M
14 Besi Plat 1.2 mm Lbr 490,800.00
15 Besi Plat 1.4 mm Lbr 513,900.00
16 Besi Plat 2 mm Lbr 1,738,200.00
17 Besi Plat 3 mm Lbr 2,170,200.00
18 Besi Reiling Firkan m1 518,500.00
19 Besi Siku Uk. 30 x 3 mm - 6 m Btg 161,700.00
20 Besi Siku Uk. 40 x 4 mm - 6 m Btg 120,100.00
21 Besi Siku Uk. 50 x 5 mm - 6 m Btg 420,400.00
22 Besi Stainless uk. 40 x 20 mm Btg 400,700.00
23 Besi Stainless uk. 40 x 40 mm Btg 435,400.00
24 Besi Strip Kg 18,600.00
25 Besi Strip ( 2 x 2 x 6 ) Btg 36,900.00
26 Braket Siku ACP Btg 36,900.00
27 Canal C 45 C75 m1 92,400.00
28 Canal C Tebal 1 mm Btg 138,600.00
29 Canal U Tebal 0.6 mm Btg 132,800.00
30 Galvalum Hollow Gypsum 40 x 40 (0.45 mm) Btg 63,500.00 10,583.33 M
31 Jaring Kawat Baja (Wiremesh) M5 Lbr 333,900.00 13,831.81 Kg
32 Jaring Kawat Baja (Wiremesh) M6 Lbr 439,700.00 12,649.60 Kg
33 Kawat Beton / Bendrat Biasa Kg 23,100.00
34 Kawat Beton / Bendrat Putih Kg 26,500.00
35 Kawat Bronjong roll 750,700.00
36 Kawat Duri /10kg 10 kg 213,600.00 2,136.00 M
37 Kawat Harmonika 25m/roll Roll 1,155,000.00
38 Kawat Jaring/Ayakan (100m/roll) Roll 346,500.00
39 Kawat Las Dos 202,100.00
40 Kawat Las LB 5 Kg 277,200.00
41 Kawat Las Listrik Kg 170,300.00
42 Kawat Las RB 2.6 Kg 194,200.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

43 Kawat Pengantung / Labrang Kg 21,000.00


44 L. Braket 1.5 mm Bh 4,200.00
45 Las Dof bh 1,100.00
46 Pagar BRC 150 x 240 Cm Hot Dip 7 mm M2 931,300.00
47 Pintu Rolling / Gulung Besi m2 1,365,000.00
48 Reling Besi hollow Motif Minimalis M2 682,500.00
49 Reling Besi hollow stainless KW1 M2 1,050,000.00
50 Reling Besi hollow stainless Khusus M2 1,365,000.00
51 Tiang BRC T 150 Cm Hot Dip 2 Inci Bh 262,500.00
52 Tipe Nestable Flange E - 100 Ø 1000 mm tebal 2 mm M1 2,728,400.00
53 Tipe Nestable Flange E - 100 Ø 600 mm tebal 2 mm M1 2,064,300.00
54 Tipe Nestable Flange E - 100 Ø 800 mm tebal 2 mm M1 2,363,500.00
BAUT / MUR / PAKU
1 Baut Mur Baja Bh 47,200.00
2 Baut Mur bh 3,100.00
3 Baut / Mur diameter 10mm kg 26,200.00
4 Baut / Mur diameter 16mm kg 26,200.00
5 Paku 1/2" - 1" kg 25,200.00
6 Paku 12" Kg 31,500.00
7 Paku 2" - 5 " Kg 31,500.00
8 Paku Beton 1" - 2" bh 1,000.00
9 Paku Beton 2.5 - 3.5" bh 2,100.00
10 Paku Beton 4" - 6" bh 2,600.00
11 Paku Biasa 2.5" - 3.5" kg 42,000.00
12 Paku Biasa 2 - 5 cm kg 42,000.00
13 Paku Biasa 4" - 10" Kg 42,000.00
14 Paku Biasa 4 - 10 cm kg 42,000.00
15 Paku Genteng Metal kg 36,700.00
16 Paku skrup Gypsum / Kalsiboard kg 26,200.00
17 Paku Jembatan Kg 21,000.00
18 Paku Payung dos 26,200.00
19 Paku Sekrup bh 1,500.00
20 Paku Sekrup 3" - 5" Dos 10,500.00
21 Paku Seng ( Kepala Besar ) Kg 25,200.00
22 Paku Seng ( Kepala Kecil ) Kg 25,200.00
23 Paku Tripleks Kg 21,000.00
24 Screw 10 - 16 x 16 Bh 300.00
25 Screw 12 - 14 x 20 Bh 400.00
26 Skrup Alderon bh 1,900.00
27 Sekrup Baja ringan bh 700.00
28 Sekrup Fixer bh 4,700.00
BAHAN CAT
1 Cat Atap dan Genteng Belmas Kg 42,000.00
2 Cat Besi Avian Kg 59,800.00
3 Cat Coating Clear Aclose Super Kg 120,700.00
4 Cat Dicco 1 Kg Aclose Super Kg 105,000.00
5 Cat Kayu Nippon Platone 8000 Kg 58,800.00
6 Cat Marka (Non Thermoplas) Kg 84,000.00
7 Cat Politur Tan Ltr 60,900.00
8 Cat Residu/Ter Kg 29,900.00
9 Cat Residu/Ter Indian Ltr 45,100.00
10 Cat Tembok Aries 5 kg 68,200.00
11 Cat Tembok ( 4.5 Kg ) Merk Vtex Kg 67,700.00
12 Cat Tembok 20 Kg Kolumex Kaleng 283,500.00
13 Cat Tembok 5 Kg Matex Kaleng 110,200.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

14 Cat Tembok Metrolite Pail 20 Ltr 567,000.00 28,350.00 Kg


15 Cat Tembok Vinilex Nippon 20 Ltr 840,000.00 42,000.00 Kg
16 Cat tembok Super Silk Lenkote 20 Ltr 1,417,500.00 70,875.00 Kg
17 Cat Easy Clean Dulux 20 Ltr 1,522,500.00 76,125.00 Kg
18 Cat Weathershield Lenkote 20 Ltr 1,522,500.00 76,125.00 Kg
19 Meny Besi Seng Altex Kg 39,900.00
20 Meny Kayu Avian Kg 59,800.00
21 Minyak Bekisting Ltr 31,500.00
22 Minyak Cat/Afduner Avian Ltr 36,700.00
23 Polimer Mortal Kg 36,700.00
24 Serat Fiber Aquaproof P x L = 440 x 75 Cm Lbr 45,100.00 13,667 M2
25 Thinner WTP (02) Kg 79,800.00
26 Tinner B Avian Kg 26,200.00
27 Vernis Tan Kg 60,900.00
28 Water Proofing No Drop Kg 61,900.00
BAHAN KAYU
1 Bambu Btg 14,700.00
2 Balok 6/16 x 4 (Kls I ) m3 3,465,000.00
3 Balok 5/7 x 4 (Kls II) m3 2,310,000.00
4 Balok 6/16 x 4 (Kls II ) m3 2,310,000.00
5 Balok 8/12 x 4 (Kls II) m3 2,310,000.00
6 Kayu Klas I M3 5,040,000.00
7 Kayu Klas II M3 2,310,000.00
8 Kayu Bekisting / Kayu Klas III M3 1,785,000.00
9 Kayu Bakar m3 105,000.00
10 Kayu Bulat Ø 8-10 m - 4" Btg 15,000.00
11 Papan Flooring Lbr 144,300.00
12 Papan Kates m3 3,045,000.00
13 Papan Lembar Seri 8 cm Lbr 36,200.00
14 Papan Palapi m3 2,921,100.00
15 Sirap Kayu (Atap) Bh 8,400.00
BAHAN KACA
1 Glass Blok bh 36,700.00
2 Kaca Rayband 5 mm (Rayband Coklat) M2 361,200.00
3 Kaca Es 5 mm M2 202,600.00
4 Kaca One Way Glass 5 mm M2 283,500.00
5 Kaca One Way Glass 8 mm M2 409,500.00
6 Kaca Polos 3 mm (Bening) M2 122,800.00
7 Kaca Polos 5 mm (Bening) M2 134,400.00
8 Kaca Polos 8 mm (Bening) M2 183,700.00
9 Kaca Polos 10 mm (Bening) M2 262,500.00
10 Kaca Polos 3 mm (Rayband) M2 111,300.00
11 Kaca Polos 5 mm (Rayband) M2 123,900.00
12 Kaca Tempered Clear 5 mm M2 262,500.00
13 Kaca Tempered Clear 8 mm M2 451,500.00
14 Kaca Tempered Clear 10 mm M2 488,200.00
15 Kaca Tempered Clear 12 mm M2 556,500.00
16 Kaca Tempered Clear 15 mm M2 2,499,000.00
17 Kaca nako Bening Set 211,000.00
18 Kaca Nako Rayband Set 285,600.00
ALUMINIUM, UPVC DAN KUNCI
1 Alas Kaki Meja Karet Bulat bh 7,300.00
2 Aluminium Composite Panel PVDF 0.3 mm Seven - Glossy Lbr 892,500.00
3 Alumunium Kusen 4" x 1.3/4" Alexindo M' 120,700.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

4 Aluminium Profil T M' 17,800.00


5 Aluminium Strip P=6 m Lebar 3 Cm M' 12,200.00
6 Cylinder 8 cm bh 483,000.00
7 Cover M' 31,500.00
8 Daun UPVC M' 189,000.00
9 Door Closer Set 157,500.00
10 Door Stopper / Door Holder Set 47,200.00
11 Door Pull (60 cm) Stainless Psg 236,200.00 118,100.00 Bh
12 Ducting Excaust Seng BJLS 0.4 M2 302,400.00
13 Engsel Jendela 3" Psg 26,200.00
14 Engsel Jendela Kualitas baik bh 36,700.00
15 Engsel Jendela Dekkson bh 36,700.00
16 Engsel Jendela Nilon Avia 3" Psg 7,300.00
17 Engsel Casement 8" Dekkson Psg 100,400.00 50,200.00 Bh
18 Engsel kupu-kupu Upvc Bh 69,300.00
19 Engsel Casement 12" Dekkson Psg 121,200.00 60,600.00 Bh
20 Engsel Pintu Km/Wc Bh 17,300.00
21 Engsel Pintu kualitas baik bh 57,700.00
22 Engsel Pintu Nilon buah 21,000.00
23 Engsel Casement 10" Dekkson Psg 110,800.00 55,400.00 Bh
24 Engsel Pintu Dekkson bh 57,700.00
25 Engsel Pintu bh 72,400.00
26 Engsel Pivot Psg 90,800.00
27 Engsel Sendok Soft Closed Huben bh 15,700.00
28 Foons m2 24,100.00
29 Full Handle Pintu Bh 210,000.00
30 Gagang jendela bh 15,700.00
31 Gagang jendela Dekkson bh 47,200.00
32 Gagang Laci Stainless bh 15,700.00
33 Gantungan Pintu Kaca Atas Dekkson bh 68,200.00
34 Gantungan Pintu Kaca Bawah Dekkson bh 682,500.00
35 Grendel Jendela Biasa Bh 10,500.00
36 Grendel Jendela Khusus Bh 17,800.00
37 Grendel Jendela Dekkson Bh 36,700.00
38 Grendel Pintu Bh 34,600.00
39 Grendel Pintu Km/Wc Pvc set 21,000.00
40 Hak Angin Jendela Khusus Bh 26,200.00
41 Hak Angin Jendela Biasa Bh 15,700.00
42 Hak tarikan pintu lemari bh 10,500.00
43 Handle Stainlesteel 120 cm set 577,500.00
44 Handle Stainlesteel 30 cm Bh 115,500.00
45 Handle Stainlesteel 80 cm set 315,000.00
46 Handle Stainlesteel 80 cm Dekkson set 577,500.00
47 Handle Pintu Km/Wc Bulat Pvc set 24,100.00
48 Hanger Curtain + Ring 2 m Unit 1,349,200.00
49 Kait Angin Khusus Psg 52,500.00
50 Kait Angin Dekkson Bh 52,500.00
51 Kait Angin jendela biasa Bh 15,700.00
52 Kunci Full Handle Bh 367,500.00
53 Kunci Jendela Rambuncis bh 23,100.00
54 Kunci Kamar Mandi Alfa Bh 47,200.00
55 Kunci Kamar Mandi Ex Muller Bh 136,500.00
56 Kunci Laci Huben bh 15,700.00
57 Kunci Lemari BH 15,700.00
58 Kunci Pintu 2 Slaag Merk Kuda Terbang Bh 81,300.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

59 Kunci Pintu 2 Slaag Merk Royal Bh 96,600.00


60 Kunci Pintu 2 Slaag Dekkson LHTR 0820 Set 525,000.00
61 Kunci Pintu Sorong Dekkson KC 8423 Set 113,400.00
62 Kunci Pintu 2 Slag Merk Kuda Terbang Bh 81,300.00
63 Kunci Pintu 2 Slag Merk Yale Bh 168,000.00
64 Kunci Pintu gagang Ex Muller Set 183,700.00
65 Kunci Pintu Kaca Dekkson bh 525,000.00
66 Kunci Pintu Tanam Merk Yale Bh 194,200.00
67 Kunci Pintu tanam Kuda Terbang Bh 99,700.00
68 Kunci Pintu tanam kualitas baik Set 472,500.00
69 Kunci Tanam Putar untuk km/wc Bh 189,000.00
70 Kusen UPVC M' 189,000.00
71 Lockase Gotri bh 362,200.00
72 Long & Short Flash Bolt Set 241,500.00
73 Master / Silinder Pintu set 157,500.00
74 Panil UPVC M' 189,000.00
75 Penjepit Kaca Atas Dekkson bh 262,500.00
76 Penjepit Kaca Bawah Dekkson bh 262,500.00
77 Penjepit Panil M2 31,500.00
78 Pintu Rolling Door Aluminium 0.8 mm m2 519,700.00
79 Ring Kunci bh 72,400.00
80 Rel Pintu Set 430,500.00
81 Rel Sliding Laci Psg 26,200.00
82 Tutup Lubang Sekrup bh 2,400.00
BAHAN PLAFOND
1 Accesoris Plafond Bh 87,100.00
2 Braket L 1,5 mm Sakura Bh 9,400.00
3 Braket T 20 Bh 3,600.00
4 Braket T 45 Bh 3,600.00
5 Gypsum Board Polos 120 x 240 9 mm Lbr 98,100.00
6 GRC Board 120 x 240 x 6 mm Lbr 120,700.00
7 HPL Solid Color 122 x 244 x 0.7 mm Grasmerino / Taco Lbr 189,000.00
8 Kalsiboard Uk. 120 x 240 x 6 mm Lbr 147,000.00
9 Kalsiboard Uk. 120 x 240 x 4.5 mm Lbr 105,000.00
10 List Profil 10 cm ( pjg 6 mtr ) Btg 86,100.00 14,350.00 M
11 List Profil 6 cm ( pjg 6 mtr ) Btg 50,400.00 8,400.00 M
12 List Profil Gypsum M' 15,700.00
13 Listplank Ornamen Lbr 142,200.00
14 Lokset + Handle bh 289,200.00
15 Metal Furing/ Hollow m' 22,000.00
16 Plywood / Multiplek Uk. 1.22 x 2.44 x 9 mm Lbr 110,200.00
17 Plywood / Multiplek Uk. 1.22 x 2.44 x 12 mm Lbr 163,100.00
18 Profil Beading M1 40,400.00
19 Profil Gypsum M' 5,200.00
20 PVC Plafond 20 cm x 6 m x 8 mm Gloss White Lbr 163,800.00 27,300.00 M
21 PVC Plafond 20 cm x 6 m x 8 mm Gloss Brown Wood Grain Lbr 176,400.00 29,400.00 M
22 PVC List Plafond Panjang 4 m Btg 67,200.00 16,800.00 M
23 Teakwood uk. 122 x 244 cm x 3 mm Lbr 157,500.00
24 Teakwood uk. 90 x 210 cm x 3 mm Lbr 105,000.00
25 Towel Hanger Unit 404,700.00
26 Tripleks Lapis Aluminium Lbr 487,700.00
27 Tripleks Lapis Kulit Jeruk Lbr 120,700.00
28 Tripleks uk. 122cm x 244 cm x 2 mm Lbr 52,500.00
29 Tripleks uk. 122cm x 244 cm x 3 mm Lbr 57,700.00
30 Tripleks uk. 122cm x 244 cm x 4 mm Lbr 84,000.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

BAHAN LANTAI DAN DINDING


1 Granit Tile Uk. 100 x 100 cm Dos 278,200.00 139,100.00 Bh
2 Granit Tile Uk. 60 x 60 cm, Polished Granito Salsa Pearl White Dos 262,500.00 65,625.00 Bh
3 Granit Tile Uk. 60 x 60 cm, Polished Polos Standar China Dos 194,200.00 48,550.00 Bh
4 Granit Tile Uk. 60 x 60 cm, UnPolished Granito Dos 346,500.00 86,625.00 Bh
5 Granit Tile Uk. 60 x 60 cm, UnPolished Standar Dos 220,500.00 55,125.00 Bh
6 Granit Tile Uk. 30 x 60 cm Dos 283,500.00
7 Granit Step Nozing uk. 30 x 60 cm Bh 78,700.00
8 Kuku Keramik uk. 2 x 10 cm Bh 900.00
9 Lantai Karpet (Tile Karpet) 24 Pcs 50 Cm x 50 Cm x 6 mm M2 173,200.00
10 List Keramik Uk. 8 x 20 cm Bh 7,300.00
11 Ornamen lantai Granit Uk. 60x60 cm Dos 435,700.00
12 Plint Granit Tile uk. 10 x 30 cm Bh 25,200.00
13 Plint Granit uk. 10 x 60 cm Bh 36,700.00
14 Plint Keramik 10 x 40 cm Asia Tile Bh 26,200.00
15 Tegel Keramik uk. 10x20 cm Dos 11,000.00
16 Tegel Keramik uk. 10x20 cm ex roman Bh 2,100.00
17 Tegel Keramik uk. 10x25 cm Dos 84,000.00
18 Tegel Keramik uk. 10x30 cm ex roman Bh 71,900.00
19 Tegel Keramik uk. 20x20 cm Asia Tile Dos 84,000.00 3,360.00 Bh
20 Tegel Keramik uk. 20x25 cm Asia Tile Dos 76,100.00 3,805.00 Bh
21 Tegel keramik uk. 25x40 cm Dos 89,200.00 8,920.00 Bh
22 Tegel Keramik uk. 30x30 cm Asia Tile Dos 66,100.00 6,009.09 Bh
23 Tegel Keramik uk. 30x30 cm (Kasar) Dos 87,100.00 7,918.18 Bh
24 Tegel Keramik uk. 40x40 cm Dos 81,900.00 13,650.00 Bh
25 Tegel Keramik uk. 40x40 cm (Kasar) Dos 94,500.00 18,900.00 Bh
26 Tegel Keramik uk. 7.5x20 cm ex roman Bh 2,100.00
27 Underlayer Karpet 1 x 2 m, T = 6 mm M2 91,800.00
28 Vynil Plint T = 2 mm 90 Cm x 15 Cm M2 141,700.00 47,233.33 Bh
29 Vynil Lantai T = 2 mm 30 Cm x 30 Cm M2 210,000.00 52,500.00 Bh
30 Wallpaper L = 50 Cm, P = 15 M M1 84,000.00
BAHAN SANITARY
1 Bak Air Fiber Plastik 120 Ltr Bh 364,800.00
2 Bath Up Panjang Unit 23,625,000.00
3 Bath Up Sudut Set 78,750,000.00
4 Bidet Bh 3,614,600.00
5 Floor Drain Plastik Bh 26,200.00
6 Floor Drain Stainless Bh 173,200.00
7 Hand Shower TX 474 XP Merk Toto Bh 1,522,500.00
8 Jet Shower (Shower Closet) Unit 420,000.00
9 Kitchen Zink (Twin) stainless steel Bh 2,520,000.00
10 Kitchen Zink (single) stainless steel bh 1,155,000.00
11 Kitchen Zink (Twin) Biasa Unit 458,300.00
12 Klosed Duduk Standar Merk INA Set 892,500.00
13 Kloset Duduk Monoblok Merk Trilliun Bh 1,638,000.00
14 Kloset Duduk Monoblok Komplit Merk Toto Bh 2,730,000.00
15 Kloset Duduk + Jet Spray Merk Toto Bh 2,782,500.00
16 Kloset Duduk Standar Merk INA Bh 1,601,200.00
17 Kloset Jongkok Biasa Merk INA Bh 199,500.00
18 Kloset Jongkok Biasa Eks INA Bh 173,200.00
19 Kloset Jongkok Biasa Merk Trilliun Bh 220,500.00
20 Kloset Jongkok Standar Merk INA Bh 577,500.00
21 Kloset Jongkok Standar eks INA Bh 183,700.00
22 Kran Air 1/2" bh 10,500.00
23 Kran Air T23B13 Merk Toto Unit 210,000.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

24 Kran Panas Dingin Shower buah 404,200.00


25 Kran Wudhu Unit 15,700.00
26 Pegangan Toilet P = 80 Cm Stainless Bh 294,000.00
27 Pintu Aluminium Khusus Bh 1,102,500.00
28 Pintu Aluminium Biasa Bh 472,500.00
29 Roof Drain Stainless 3" Cast Iron Bh 68,200.00
30 Seal Tape onda bh 5,200.00
31 Tangki air 1000 ltr bh 1,732,500.00
32 Tangki air 2000 ltr bh 3,465,000.00
33 Urinoir Merk Toto bh 2,625,000.00
34 Urinoir Dinding standar Bh 472,500.00
35 Water Heat Ariston Merk Ariston Bh 3,832,500.00
36 Waterproof + Upah 5000/M2 M2 43,500.00
37 Westafel Under Counter set 892,500.00
38 Wastafel Gantung Komplit Toto set 1,890,000.00
BAHAN MEKANIKAL ELEKTRIKAL
1 Box Panel 3 Phase Komplit Bh 5,000,000.00
2 Box MCB 1 group OB Include Pasang Bh 52,500.00
3 Box MCB 2 group IB Include Pasang Bh 68,200.00
4 Fitting 160 Watt Mercury Bh 24,100.00
5 Fitting 250 Watt Mercury Bh 48,300.00
6 Fitting Lampu bh 8,400.00
7 Hanger Tray W 150 mm Set 39,800.00
8 Kabel Biasa Ukuran NYM 3 x 2.5 mm Merk Eterna Roll 1,412,700.00
9 Kabel Biasa Ukuran NYM 3 x 2.5 mm Roll 1,575,000.00
10 Kabel Biasa Ukuran NYM 2 x 1.5 mm 100m Roll 892,500.00
11 Kabel Biasa Ukuran NYM 2 x 1.5 mm Biasa Roll 422,600.00
12 Kabel Duct 33 x 33 Btg 31,500.00 18,529.41 M1
13 Kabel NYM uk. 2 x 2.5 mm Roll 1,155,000.00
14 Kabel NYM uk. 2 x 2.5 mm Eterna M1 14,700.00
15 Kabel Tray U 150 x 50 x 2400 x 1.2 mm Btg 162,700.00 67,791.67 M1
16 Kabel Twisted 4 x 16 mm Sutrado M1 68,200.00
17 Kas RM VIP 2 x 18 watt Set TL Biasa Set 294,000.00
18 Kas RM VIP 2 x 18 watt Set TL LED Set 325,500.00
19 Kas RM VIP 2 x 36 watt Set TL Biasa Set 409,500.00
20 Kas RM VIP 2 x 36 watt Set TL LED Set 456,700.00
21 Kas TKO 2 x 18 watt Set TL Biasa Set 220,500.00
22 Kas TKO 2 x 18 watt Set TL LED Set 252,000.00
23 Kas TKO 2 x 36 watt Set TL Biasa Set 246,700.00
24 Kas TKO 2 x 36 watt Set TL LED Set 309,700.00
25 Kas Lampu Sorot Phillips Set -
26 Kas Waterproof 2 x 36 watt Set 273,000.00
27 Klem Sadel No. 10 Dos 18,300.00
28 Klem Sadel No. 6 Dos 12,000.00
29 Klem Sadel No. 7 Dos 14,400.00
30 Klem Sadel No. 8 Dos 15,700.00
31 Klem Sadel No. 9 Dos 16,900.00
32 L BOW bh 6,300.00
33 Lampu Balak V 2 x 18 watt Set TL Biasa Set 231,000.00
34 Lampu Balak V 2 x 18 watt Set TL LED Set 262,500.00
35 Lampu Balak V 2 x 36 watt Set TL Biasa Set 246,700.00
36 Lampu TL-D Waterproof 1 x 18 Watt Philips Set 241,500.00
37 Lampu Mercury Ukuran 500 Watt Philips Bh 181,100.00
38 Lampu Pijar Ukuran 5 Watt Philips Bh 30,100.00
39 Lampu Pijar Ukuran 60 - 100 Watt Philips Bh 24,100.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

40 Lampu SL 11 Watt Philips bh 36,700.00


41 Lampu SL 15 Watt Tornado BH 52,500.00
42 Lampu SL 18 Watt Philips Bh 42,000.00
43 Lampu SL 18 Watt Down Light Ø 4" + Box Philips 99,700.00
44 Lampu SL 23 Watt Philips Bh 47,200.00
45 Lampu SL 5 Watt Philips bh 29,400.00
46 Lampu SL 8 Watt Philips bh 31,500.00
47 Lampu TL 16 Watt Philips Bh 68,200.00
48 Lampu TL 40 Watt Philips Bh 90,800.00
49 Lampu TL 9 Watt Philips Bh 57,700.00
50 Lampu TL Bulat Ukuran 20 Watt Philips Bh 10,500.00
51 Lampu TL Bulat Ukuran 32 Watt Philips Bh 48,800.00
52 Lampu Dinding Phillips Bh 126,000.00
53 Lampu Bohlam LED 18 Watt + Fiting Philips Bh 84,000.00
54 Lampu Downlight LED 23 Watt Phillips Bh 141,700.00
55 Lampu Downlight LED 15 Watt Phillips Bh 105,000.00
56 Lampu Downlight LED 9 Watt Phillips Bh 88,200.00
57 Lampu Downlight LED 5 Watt Phillips Bh 68,200.00
58 Lampu Downlight LED 3 Watt Phillips Bh 50,400.00
59 Lampu LED RM 2 x 18 Watt Phillips Set 325,500.00
60 Mangkuk Saklar/stop kontak bh 8,400.00
61 Panel Distribusi bh 7,507,500.00
62 Pipa listrik 5/8" btg 10,500.00
63 Sakelar 3 Gang Vertikal E3033V1 EBGS Schneider bh 189,000.00
64 Sakelar 2 Gang Vertikal E3032V1 EBGS Schneider bh 147,000.00
65 Sakelar 1 Gang Vertikal E3031V1 EBGS Schneider bh 84,000.00
66 Stop Kontak Lantai 2 Lubang Panasonic bh 724,500.00
67 Saklar 1 Gang Fluorescence Panasonic bh 37,800.00
68 Saklar 2 Gang Fluorescence Panasonic bh 51,400.00
69 Saklar 3 Gang Fluorescence Panasonic bh 67,200.00
70 Saklar Triple setara broco bh 31,500.00
71 Saklar double setara broco bh 26,200.00
72 Saklar tunggal setara broco bh 21,000.00
73 Stop Kontak setara broco bh 21,000.00
74 Stop Kontak Schuko 2 lubang Panasonic Bh 76,600.00
75 Stop Kontak Schuko 1 lubang Panasonic Bh 52,200.00
76 Tiang Lampu Stadiun T 20 Meter Set 78,750,000.00
77 Titik Mata Lampu, Sakelar dan AC Bh 110,200.00
BAHAN LAINNYA
1 Air Ltr 10.00
2 Air M3 5,200.00
3 Baliho M2 52,500.00
4 Bracket Penggantung Apar 6 Kg Bh 231,000.00
5 Cornice Adhesive zak 89,200.00
6 Dempul Jadi impra Kg 47,200.00
7 Exhaust Fan Plafond dia 6" Panasonic Unit 325,500.00
8 Fire Extinguisher (APAR) 6,8 Kg CO2 Chemguard Bh 924,000.00
9 Formit (Penjaga Jarak Bekisting) bh 5,700.00
10 Hand Dryer Krisbow AK2630K Unit 2,467,500.00
11 Isolator Bh 1,000.00
12 Kertas Pasir Lbr 5,200.00
13 Kuas 1" bh 4,200.00
14 Kuas 2" Bh 6,300.00
15 Kuas 3" Bh 10,500.00
16 Kuas 4" Bh 13,600.00

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

17 Kuas 5" Bh 15,700.00


18 Kuas Roll Bh 26,200.00
19 Kursi Stadiun Fiberglass Bh 341,200.00
20 Lem Kayu Kg 21,000.00
21 Lem Profil Kg 113,400.00
22 Lem Walpaper Kg 15,700.00
23 Lem Vynil Kg 126,000.00
24 Lem Karpet Kg 18,900.00
25 Marmelkalk Kg 6,300.00
26 Minyak Pelumas Ltr 26,200.00
27 Palmur Kayu Altex Kg 36,700.00
28 Palmur Tembok Kg 15,700.00
29 Plastizier Kg 42,000.00
30 Perban Gypsum Roll 15,700.00
31 Profil Beton L 45 Cm Serut M1 288,700.00
32 Profil Beton Daerah M1 147,000.00
33 Pupuk Kandang Kg 25,200.00
34 Tepung Gypsum Kg 17,300.00
35 Pisau Dempul set 26,200.00
36 Polymide (03) Kg 252,300.00
37 Sealant (lem kaca) tube 26,200.00
38 Sealant (lem kaca) kg 42,000.00
39 PVC Waterstop L = 150 mm M1 76,600.00
40 PVC Waterstop L = 200 mm M1 97,600.00
41 PVC Waterstop L > 230 mm M1 114,400.00
42 Tali Ijuk M3 31,500.00
43 Termocouple Bh 26,200.00
44 Sabun Kg 26,200.00
45 Solar Ltr 12,000.00
46 Soda Api Kg 26,200.00
Pipa GIP
1 Clame Sadle 1/2"-3" Bh 64,600.00
2 Diameter 1/2" Btg 205,800.00 51,450.00 m
3 Diameter 3/4" Btg 264,600.00 66,150.00 m
4 Diameter 1" Btg 323,400.00 80,850.00 m
5 Diameter 1-1/4" Btg 399,000.00 99,750.00 m
6 Diameter 1-1/2" Btg 470,400.00 117,600.00 m
7 Diameter 1,5" Btg 470,400.00 117,600.00 m
8 Diameter 2" Btg 588,000.00 147,000.00 m
9 Diameter 2" Medium A Btg 882,000.00 220,500.00 m
10 Diameter 2" Medium B Btg 588,000.00 147,000.00 m
11 Diameter 3" Btg 999,600.00 249,900.00 m
12 Diameter 4" Btg 1,646,400.00 411,600.00 m
13 Double Niple 1" Bh 45,100.00
14 Knie Gip 1/2" Bh 14,100.00
15 Pipa PPR 1/2" Btg 50,400.00 12,600.00 m
16 Pipa PPR 3/4" Btg 945,000.00 157,500.00 m
17 Pipi Tipe C Diameter 8" Btg 706,100.00 176,525.00 m
18 Pipa Bulat Stenless 2" Btg 382,400.00 95,600.00 m
19 Tee Gip 1/2" Bh 14,100.00
Pipa PVC Aw (4 mm) :
1 Diameter 1/2" Panjang 4 m1 Btg 23,500.00 5,875.00 m
2 Diameter 3/4" Btg 35,200.00 8,800.00 m
3 Diameter 1" Btg 47,000.00 11,750.00 m
4 Diameter 1 1/4" Btg 70,800.00 17,700.00 m

NO URAIAN SPESIFIKASI SATUAN HARGA SATUAN KET.

5 Diameter 1 1/2" Btg 82,400.00 20,600.00 m


6 Diameter 2" Btg 105,800.00 26,450.00 m
7 Diameter 2,5" Btg 152,800.00 38,200.00 m
8 Diameter 3" Btg 207,000.00 51,750.00 m
9 Diameter 4" Btg 341,000.00 85,250.00 m
10 Tee PVC 4" Bh 94,000.00
11 Tee PVC 3" Bh 52,900.00
12 Tee PVC 2" Bh 29,400.00
13 Tee PVC 1,5" Bh 17,600.00
Pipa Tembaga ASTM B819
1 Diameter 1/2" Panjang 5,8 m1 Tebal 0,89 mm Btg 357,000.00 64,909.09 m
SEWA PERALATAN
1 Stamper Sewa/Hari 100,000.00
2 Whell Loader 1.0 - 1.8 M3 Sewa/Hari 550,000.00
3 Vibratory Roller 10 - 13 T Sewa/Hari 400,000.00
4 Motor Grader Sewa/Hari 500,000.00
5 Excavator 80 - 140 HP Sewa/Hari 500,000.00
6 Water Tanker Truck Sewa/Hari 400,000.00
7 Dump Truck 3 - 4 M3 Sewa/Hari 300,000.00
8 Concrete Vibrator Sewa/Hari 50,000.00
9 Concrete Batching Plant Sewa/Hari 660,000.00
10 Truck Mixer Sewa/Hari 600,000.00
11 Rock Drill Breaker Sewa/Hari 450,000.00
12 Minicrane Sewa/Hari 350,000.00
SALAKAN, MEI 2022
DIBUAT OLEH :
CV. KAUTSAR
Engineering Consultant

MUHAMMAD TRIMUKTI, ST
Direktur
UP
Harga Satuan
DOWN

100,000.00 0% 100,000.00
145,000.00 0% 145,000.00
170,000.00 0% 170,000.00
120,600.00 0% 120,600.00

1,260,000.00 5% 1,200,000.00
101,850.00 5% 97,000.00
47,250.00 5% 45,000.00
146,475.00 5% 139,500.00
73,500.00 5% 70,000.00
201,600.00 5% 192,000.00
120,750.00 5% 115,000.00
131,250.00 5% 125,000.00
6,300.00 5% 6,000.00
84,000.00 5% 80,000.00 14,000.00
84,000.00 5% 80,000.00
46,200.00 5% 44,000.00
36,750.00 5% 35,000.00
26,250.00 5% 25,000.00
27,300.00 5% 26,000.00
144,900.00 5% 138,000.00
34,650.00 5% 33,000.00
1,050.00 5% 1,000.00 HARGA ACRYLIC DAN PASANG 8MM
525.00 5% 500.00 32,000.00 HERI
525.00 5% 500.00 8,000.00 PIHAK III
525.00 5% 500.00 40,000.00
54,600.00 5% 52,000.00
73,500.00 5% 70,000.00
42,000.00 5% 40,000.00
49,350.00 5% 47,000.00
8,400.00 5% 8,000.00
10,500.00 5% 10,000.00
13,650.00 5% 13,000.00
18,900.00 5% 18,000.00
68,250.00 5% 65,000.00
86,100.00 5% 82,000.00
99,750.00 5% 95,000.00
UP
Harga Satuan
DOWN
142,800.00 5% 136,000.00
57,750.00 5% 55,000.00

4,200.00 5% 4,000.00
2,835.00 5% 2,700.00
3,360.00 5% 3,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
294,210.00 5% 280,200.00
1,050.00 5% 1,000.00
840.00 5% 800.00
630.00 5% 600.00
12,600.00 5% 12,000.00
9,975.00 5% 9,500.00
8,400.00 5% 8,000.00
288,750.00 5% 275,000.00
341,250.00 5% 325,000.00
341,250.00 5% 325,000.00
341,250.00 5% 325,000.00
341,250.00 5% 325,000.00
341,250.00 5% 325,000.00
294,000.00 5% 280,000.00
6,825.00 5% 6,500.00
5,775.00 5% 5,500.00
57,750.00 5% 55,000.00
241,500.00 5% 230,000.00
1,350.00 294,000.00 5% 280,000.00
210,000.00 5% 200,000.00
288,750.00 5% 275,000.00
131,250.00 5% 125,000.00
47,250.00 5% 45,000.00
1,400.00 279,300.00 5% 266,000.00 1,117,200.00
183,750.00 5% 175,000.00

UP
Harga Satuan
DOWN
161,700.00 5% 154,000.00
170,940.00 5% 162,800.00
315,000.00 5% 300,000.00
315,000.00 5% 300,000.00
#NAME?
2,100,000.00 5% 2,000,000.00
16,170.00 5% 15,400.00
152,250.00 5% 145,000.00
94,500.00 5% 90,000.00 1,890.00
50,400.00 5% 48,000.00 1,008.00
15,225.00 5% 14,500.00
609,000.00 5% 580,000.00

18,500.00 0% 18,500.00
15,400.00 0% 15,400.00
2.664 Kg/Btg 42,650.00 0% 42,650.00
4.740 Kg/Btg 69,550.00 0% 69,550.00
7.404 Kg/Btg 105,000.00 0% 105,000.00
10.656 Kg/Btg 145,000.00 0% 145,000.00
14.520 Kg/Btg 196,000.00 0% 196,000.00
18.936 Kg/Btg 269,000.00 0% 269,000.00
18,676.35 0% 18,676.35
1,050.00 5% 1,000.00
173,250.00 5% 165,000.00
146,685.00 5% 139,700.00
136,500.00 5% 130,000.00
490,875.00 5% 467,500.00
513,975.00 5% 489,500.00
1,738,275.00 5% 1,655,500.00
2,170,245.00 5% 2,066,900.00
518,595.00 5% 493,900.00
161,700.00 5% 154,000.00
120,120.00 5% 114,400.00
420,420.00 5% 400,400.00
400,785.00 5% 381,700.00
435,435.00 5% 414,700.00
- 5% -
36,960.00 5% 35,200.00
36,960.00 5% 35,200.00
92,400.00 5% 88,000.00
138,600.00 5% 132,000.00
132,825.00 5% 126,500.00
63,525.00 5% 60,500.00
24.14 333,900.00 5% 318,000.00
34.76 439,740.00 5% 418,800.00
23,100.00 5% 22,000.00
26,565.00 5% 25,300.00
750,750.00 5% 715,000.00
213,675.00 5% 203,500.00
1,155,000.00 5% 1,100,000.00
346,500.00 5% 330,000.00
202,125.00 5% 192,500.00
277,200.00 5% 264,000.00
170,362.50 5% 162,250.00
194,250.00 5% 185,000.00

UP
Harga Satuan
DOWN
21,000.00 5% 20,000.00
4,200.00 5% 4,000.00
1,155.00 5% 1,100.00
931,350.00 5% 887,000.00
1,365,000.00 5% 1,300,000.00
682,500.00 5% 650,000.00
1,050,000.00 5% 1,000,000.00
1,365,000.00 5% 1,300,000.00
262,500.00 5% 250,000.00
2,728,425.00 5% 2,598,500.00
2,064,300.00 5% 1,966,000.00
2,363,550.00 5% 2,251,000.00

47,250.00 5% 45,000.00
3,150.00 5% 3,000.00
26,250.00 5% 25,000.00
26,250.00 5% 25,000.00
25,200.00 5% 24,000.00
31,500.00 5% 30,000.00
31,500.00 5% 30,000.00
1,050.00 5% 1,000.00
2,100.00 5% 2,000.00
2,625.00 5% 2,500.00
42,000.00 5% 40,000.00
42,000.00 5% 40,000.00
42,000.00 5% 40,000.00
42,000.00 5% 40,000.00
36,750.00 5% 35,000.00
26,250.00 5% 25,000.00
21,000.00 5% 20,000.00
26,250.00 5% 25,000.00
1,575.00 5% 1,500.00
10,500.00 5% 10,000.00
25,200.00 5% 24,000.00
25,200.00 5% 24,000.00
21,000.00 5% 20,000.00
315.00 5% 300.00
420.00 5% 400.00
1,995.00 5% 1,900.00 1,500.00
735.00 5% 700.00
4,725.00 5% 4,500.00

42,000.00 5% 40,000.00
59,850.00 5% 57,000.00
120,750.00 5% 115,000.00
105,000.00 5% 100,000.00
58,800.00 5% 56,000.00
84,000.00 5% 80,000.00
60,900.00 5% 58,000.00
29,925.00 5% 28,500.00
45,150.00 5% 43,000.00
68,250.00 5% 65,000.00
67,725.00 5% 64,500.00
283,500.00 5% 270,000.00
110,250.00 5% 105,000.00

UP
Harga Satuan
DOWN
28 567,000.00 5% 540,000.00 Konversi Ltr ke Kg = 1,4 kg
28 840,000.00 5% 800,000.00 Konversi Ltr ke Kg = 1,4 kg
1,417,500.00 5% 1,350,000.00 20 ltr x 1,4 28 kg #VALUE!
1,522,500.00 5% 1,450,000.00 -
1,522,500.00 5% 1,450,000.00
39,900.00 5% 38,000.00 70,875.00
59,850.00 5% 57,000.00 92,137.50
31,500.00 5% 30,000.00
36,750.00 5% 35,000.00 kg
36,750.00 5% 35,000.00 1
45,150.00 5% 43,000.00
79,800.00 5% 76,000.00
26,250.00 5% 25,000.00
60,900.00 5% 58,000.00
61,950.00 5% 59,000.00

14,700.00 5% 14,000.00
3,465,000.00 5% 3,300,000.00
2,310,000.00 5% 2,200,000.00
2,310,000.00 5% 2,200,000.00
2,310,000.00 5% 2,200,000.00
5,040,000.00 5% 4,800,000.00
2,310,000.00 5% 2,200,000.00
1,785,000.00 5% 1,700,000.00 55,000.00
105,000.00 5% 100,000.00
15,000.00 0% 15,000.00
144,375.00 5% 137,500.00
3,045,000.00 5% 2,900,000.00
36,225.00 5% 34,500.00
2,921,100.00 5% 2,782,000.00
8,400.00 5% 8,000.00

36,750.00 5% 35,000.00
361,200.00 5% 344,000.00
202,650.00 5% 193,000.00
283,500.00 5% 270,000.00
409,500.00 5% 390,000.00
122,850.00 5% 117,000.00
134,400.00 5% 128,000.00
183,750.00 5% 175,000.00
262,500.00 5% 250,000.00
111,300.00 5% 106,000.00
123,900.00 5% 118,000.00
262,500.00 5% 250,000.00
451,500.00 5% 430,000.00
488,250.00 5% 465,000.00
556,500.00 5% 530,000.00
2,499,000.00 5% 2,380,000.00
211,050.00 5% 201,000.00
285,600.00 5% 272,000.00

7,350.00 5% 7,000.00
892,500.00 5% 850,000.00 569,000.00 30% 739,700.00
120,750.00 5% 115,000.00

UP
Harga Satuan
DOWN
17,850.00 5% 17,000.00
12,250.00 5% 11,666.67
483,000.00 5% 460,000.00 15% 400,000.00
31,500.00 5% 30,000.00 20% 25,000.00
189,000.00 5% 180,000.00 20% 150,000.00
157,500.00 5% 150,000.00
47,250.00 5% 45,000.00
236,250.00 5% 225,000.00
302,400.00 5% 288,000.00 20% 240,000.00 tambah pasang
26,250.00 5% 25,000.00
36,750.00 5% 35,000.00
36,750.00 5% 35,000.00
7,350.00 5% 7,000.00
100,485.00 5% 95,700.00 10% 87,000.00
69,300.00 5% 66,000.00 10% 60,000.00
121,275.00 5% 115,500.00 10% 105,000.00
17,325.00 5% 16,500.00 10% 15,000.00
57,750.00 5% 55,000.00
21,000.00 5% 20,000.00
110,880.00 5% 105,600.00 10% 96,000.00
57,750.00 5% 55,000.00
72,450.00 5% 69,000.00 15% 60,000.00
90,825.00 5% 86,500.00
15,750.00 5% 15,000.00
24,150.00 5% 23,000.00
210,000.00 5% 200,000.00
15,750.00 5% 15,000.00
47,250.00 5% 45,000.00
15,750.00 5% 15,000.00
68,250.00 5% 65,000.00
682,500.00 5% 650,000.00
10,500.00 5% 10,000.00
17,850.00 5% 17,000.00
36,750.00 5% 35,000.00
34,650.00 5% 33,000.00
21,000.00 5% 20,000.00
26,250.00 5% 25,000.00
15,750.00 5% 15,000.00
10,500.00 5% 10,000.00
577,500.00 5% 550,000.00
115,500.00 5% 110,000.00 10% 100,000.00
315,000.00 5% 300,000.00
577,500.00 5% 550,000.00
24,150.00 5% 23,000.00
1,349,250.00 5% 1,285,000.00
52,500.00 5% 50,000.00
52,500.00 5% 50,000.00
15,750.00 5% 15,000.00
367,500.00 5% 350,000.00
23,100.00 5% 22,000.00
47,250.00 5% 45,000.00
136,500.00 5% 130,000.00
15,750.00 5% 15,000.00
15,750.00 5% 15,000.00
81,375.00 5% 77,500.00

UP
Harga Satuan
DOWN
96,600.00 5% 92,000.00
525,000.00 5% 500,000.00
113,400.00 5% 108,000.00
81,375.00 5% 77,500.00
168,000.00 5% 160,000.00
183,750.00 5% 175,000.00
525,000.00 5% 500,000.00
194,250.00 5% 185,000.00
99,750.00 5% 95,000.00
472,500.00 5% 450,000.00
189,000.00 5% 180,000.00
189,000.00 5% 180,000.00 20% 150,000.00
362,250.00 5% 345,000.00 15% 300,000.00
241,500.00 5% 230,000.00 15% 200,000.00
157,500.00 5% 150,000.00
189,000.00 5% 180,000.00 20% 150,000.00
262,500.00 5% 250,000.00
262,500.00 5% 250,000.00
31,500.00 5% 30,000.00 20% 25,000.00
519,750.00 5% 495,000.00
72,450.00 5% 69,000.00 15% 60,000.00
430,500.00 5% 410,000.00 ongkos kirim dan rakit
26,250.00 5% 25,000.00
2,415.00 5% 2,300.00 15% 2,000.00

87,150.00 5% 83,000.00
9,450.00 5% 9,000.00
3,675.00 5% 3,500.00
3,675.00 5% 3,500.00
98,175.00 5% 93,500.00
120,750.00 5% 115,000.00
189,000.00 5% 180,000.00 15% 195,000.00
147,000.00 5% 140,000.00
105,000.00 5% 100,000.00
86,100.00 5% 82,000.00
50,400.00 5% 48,000.00
15,750.00 5% 15,000.00
142,275.00 5% 135,500.00
289,275.00 5% 275,500.00
22,050.00 5% 21,000.00
110,250.00 5% 105,000.00 5% 100,000.00
163,170.00 5% 155,400.00 5% 148,000.00
40,425.00 5% 38,500.00
5,250.00 5% 5,000.00
1.2 163,800.00 5% 156,000.00
176,400.00 5% 168,000.00
67,200.00 5% 64,000.00
157,500.00 5% 150,000.00
105,000.00 5% 100,000.00
404,775.00 5% 385,500.00
487,725.00 5% 464,500.00
120,750.00 5% 115,000.00
52,500.00 5% 50,000.00
57,750.00 5% 55,000.00
84,000.00 5% 80,000.00

UP
Harga Satuan
DOWN

278,250.00 5% 265,000.00
262,500.00 5% 250,000.00
194,250.00 5% 185,000.00
346,500.00 5% 330,000.00
220,500.00 5% 210,000.00
283,500.00 5% 270,000.00
78,750.00 5% 75,000.00
945.00 5% 900.00
173,250.00 5% 165,000.00
7,350.00 5% 7,000.00
435,750.00 5% 415,000.00
25,200.00 5% 24,000.00
36,750.00 5% 35,000.00
26,250.00 5% 25,000.00
11,025.00 5% 10,500.00
2,100.00 5% 2,000.00
84,000.00 5% 80,000.00
71,925.00 5% 68,500.00
84,000.00 5% 80,000.00
76,125.00 5% 72,500.00
89,250.00 5% 85,000.00
66,150.00 5% 63,000.00
87,150.00 5% 83,000.00
81,900.00 5% 78,000.00
94,500.00 5% 90,000.00
2,100.00 5% 2,000.00
91,875.00 5% 87,500.00
141,750.00 5% 135,000.00
210,000.00 5% 200,000.00
84,000.00 5% 80,000.00

364,875.00 5% 347,500.00
23,625,000.00 5% 22,500,000.00
78,750,000.00 5% 75,000,000.00
3,614,625.00 5% 3,442,500.00
26,250.00 5% 25,000.00
173,250.00 5% 165,000.00
1,522,500.00 5% 1,450,000.00
420,000.00 5% 400,000.00
2,520,000.00 5% 2,400,000.00
1,155,000.00 5% 1,100,000.00
458,325.00 5% 436,500.00
892,500.00 5% 850,000.00
1,638,000.00 5% 1,560,000.00
2,730,000.00 5% 2,600,000.00
2,782,500.00 5% 2,650,000.00
1,601,250.00 5% 1,525,000.00 #NAME?
199,500.00 5% 190,000.00
173,250.00 5% 165,000.00
220,500.00 5% 210,000.00
577,500.00 5% 550,000.00
183,750.00 5% 175,000.00
10,500.00 5% 10,000.00
210,000.00 5% 200,000.00

UP
Harga Satuan
DOWN
404,250.00 5% 385,000.00
15,750.00 5% 15,000.00
294,000.00 5% 280,000.00
1,102,500.00 5% 1,050,000.00
472,500.00 5% 450,000.00
68,250.00 5% 65,000.00
5,250.00 5% 5,000.00
1,732,500.00 5% 1,650,000.00
3,465,000.00 5% 3,300,000.00
2,625,000.00 5% 2,500,000.00
472,500.00 5% 450,000.00
3,832,500.00 5% 3,650,000.00
43,575.00 5% 41,500.00
892,500.00 5% 850,000.00
1,890,000.00 5% 1,800,000.00

4,357,500.00 5% 4,150,000.00
52,500.00 5% 50,000.00
68,250.00 5% 65,000.00
24,150.00 5% 23,000.00
48,300.00 5% 46,000.00
8,400.00 5% 8,000.00
39,847.50 5% 37,950.00 10% 34500
1,412,775.00 5% 1,345,500.00
1,575,000.00 5% 1,500,000.00
892,500.00 5% 850,000.00
422,625.00 5% 402,500.00
31,500.00 5% 30,000.00
1,155,000.00 5% 1,100,000.00
14,700.00 5% 14,000.00
162,750.00 5% 155,000.00 10% 184000
68,250.00 5% 65,000.00
294,000.00 5% 280,000.00
325,500.00 5% 310,000.00
409,500.00 5% 390,000.00
456,750.00 5% 435,000.00
220,500.00 5% 210,000.00
252,000.00 5% 240,000.00
246,750.00 5% 235,000.00
309,750.00 5% 295,000.00
- 5%
273,000.00 5% 260,000.00
18,375.00 5% 17,500.00
12,075.00 5% 11,500.00
14,490.00 5% 13,800.00
15,750.00 5% 15,000.00
16,905.00 5% 16,100.00
6,300.00 5% 6,000.00
231,000.00 5% 220,000.00
262,500.00 5% 250,000.00
246,750.00 5% 235,000.00 ongkos pasang
241,500.00 5% 230,000.00 15% 200,000.00
181,125.00 5% 172,500.00
30,187.50 5% 28,750.00
24,150.00 5% 23,000.00

UP
Harga Satuan
DOWN
36,750.00 5% 35,000.00
52,500.00 5% 50,000.00
42,000.00 5% 40,000.00
99,750.00 5% 95,000.00
47,250.00 5% 45,000.00
29,400.00 5% 28,000.00
31,500.00 5% 30,000.00
68,250.00 5% 65,000.00
90,825.00 5% 86,500.00
57,750.00 5% 55,000.00
10,500.00 5% 10,000.00
48,825.00 5% 46,500.00
126,000.00 5% 120,000.00
84,000.00 5% 80,000.00
141,750.00 5% 135,000.00
105,000.00 5% 100,000.00
88,200.00 5% 84,000.00 tambahan acc ongkos pasang
68,250.00 5% 65,000.00 tambahan acc ongkos pasang
50,400.00 5% 48,000.00 tambahan acc ongkos pasang
325,500.00 5% 310,000.00
8,400.00 5% 8,000.00
7,507,500.00 5% 7,150,000.00
10,500.00 5% 10,000.00
189,000.00 5% 180,000.00
147,000.00 5% 140,000.00
84,000.00 5% 80,000.00
724,500.00 5% 690,000.00
37,800.00 5% 36,000.00
51,450.00 5% 49,000.00
67,200.00 5% 64,000.00
31,500.00 5% 30,000.00
26,250.00 5% 25,000.00
21,000.00 5% 20,000.00
21,000.00 5% 20,000.00
76,650.00 5% 73,000.00
52,290.00 5% 49,800.00 8,300.00
78,750,000.00 5% 75,000,000.00 60,000,000.00
110,250.00 5% 105,000.00

10.00 10.00
5,250.00 5% 5,000.00
52,500.00 5% 50,000.00
231,000.00 5% 220,000.00
89,250.00 5% 85,000.00
47,250.00 5% 45,000.00
325,500.00 5% 310,000.00
924,000.00 5% 880,000.00
5,775.00 5% 5,500.00
2,467,500.00 5% 2,350,000.00
1,050.00 5% 1,000.00
5,250.00 5% 5,000.00
4,200.00 5% 4,000.00
6,300.00 5% 6,000.00
10,500.00 5% 10,000.00
13,650.00 5% 13,000.00

UP
Harga Satuan
DOWN
15,750.00 5% 15,000.00
26,250.00 5% 25,000.00
341,250.00 5% 325,000.00
21,000.00 5% 20,000.00
113,400.00 5% 108,000.00
15,750.00 5% 15,000.00
126,000.00 5% 120,000.00
18,900.00 5% 18,000.00
6,300.00 5% 6,000.00
26,250.00 5% 25,000.00
36,750.00 5% 35,000.00
15,750.00 5% 15,000.00
42,000.00 5% 40,000.00
15,750.00 5% 15,000.00
288,750.00 5% 275,000.00
147,000.00 5% 140,000.00
25,200.00 5% 24,000.00
17,325.00 5% 16,500.00
26,250.00 5% 25,000.00
252,367.50 5% 240,350.00
26,250.00 5% 25,000.00
42,000.00 5% 40,000.00
76,650.00 5% 73,000.00
97,650.00 5% 93,000.00
114,450.00 5% 109,000.00
31,500.00 5% 30,000.00
26,250.00 5% 25,000.00
26,250.00 5% 25,000.00
12,075.00 5% 11,500.00
26,250.00 5% 25,000.00

64,680.00 5% 61,600.00
205,800.00 5% 196,000.00
264,600.00 5% 252,000.00
323,400.00 5% 308,000.00
399,000.00 5% 380,000.00
470,400.00 5% 448,000.00
470,400.00 5% 448,000.00
588,000.00 5% 560,000.00
882,000.00 5% 840,000.00
588,000.00 5% 560,000.00
999,600.00 5% 952,000.00
1,646,400.00 5% 1,568,000.00
45,150.00 5% 43,000.00
14,175.00 5% 13,500.00
50,400.00 5% 48,000.00
945,000.00 5% 900,000.00
706,125.00 5% 672,500.00
382,410.00 5% 364,200.00
14,175.00 5% 13,500.00

23,520.00 5% 22,400.00
35,280.00 5% 33,600.00
47,040.00 5% 44,800.00
70,875.00 5% 67,500.00

UP
Harga Satuan
DOWN
82,425.00 5% 78,500.00
105,840.00 5% 100,800.00
152,880.00 5% 145,600.00
207,060.00 5% 197,200.00
341,040.00 5% 324,800.00
94,080.00 5% 89,600.00
52,920.00 5% 50,400.00
29,400.00 5% 28,000.00
17,640.00 5% 16,800.00

357,000.00 5% 340,000.00

100,000.00 0% 100,000.00
550,000.00 0% 550,000.00
400,000.00 0% 400,000.00
500,000.00 0% 500,000.00
500,000.00 0% 500,000.00
400,000.00 0% 400,000.00
300,000.00 0% 300,000.00
50,000.00 0% 50,000.00
660,000.00 0% 660,000.00
600,000.00 0% 600,000.00
450,000.00 0% 450,000.00
350,000.00 0% 350,000.00
ongkos kirim + laba harga bhineka
ongkos kirim + laba harga bhineka
ongkos kirim + laba harga bhineka
ITEM PEMBAYARAN NOMOR : I.1
JENIS PEKERJAAN : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK : 0.5838 %
Lembar 1.2-1

HARGA SATUAN JUMLAH HARGA


NO URAIAN SATUAN VOL.
(Rp.) (Rp.)
A. SEWA TANAH M2 -

B. PERALATAN

Periksa lembar 1.2-2 300,000.00

C. FASILITAS KONTRAKTOR

1 Direksi Keet dan Barak Kerja Ls 1.00 3,000,000.00 3,000,000.00

D. FASILITAS LABORATORIUM

1 Uji Lab. Mutu Beton K-250 Ls 1.00 3,000,000.00 3,000,000.00

E. LAIN-LAIN

F. DEMOBILISASI Ls 1.00 90,000.00 90,000.00

Total Biaya Mobilisasi 6,390,000.00

Catatan : Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba
serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
ITEM PEMBAYARAN NOMOR : I.1
JENIS PEKERJAAN : MOBILISASI
Lembar 1.2-2

HARGA SATUAN JUMLAH HARGA


NO JENIS ALAT SATUAN VOL.
(Rp.) (Rp.)
B. PERALATAN

1 ASPHALT FINISHER Unit

2 ASPHALT SPRAYER Unit


3 BULLDOZER 100-150 HP Unit

4 COMPRESSOR 4000-6500 L\M Unit

5 CONCRETE MIXER 0.3-0.6 M3 Unit 2.00 50,000.00 100,000.00

6 DUMP TRUCK 3-4 M3 Unit 1.00 200,000.00 200,000.00

7 DUMP TRUCK Unit

8 EXCAVATOR 80-140 HP Unit


9 FLAT BED TRUCK Unit

10 GENERATOR SET Unit

11 MOTOR GRADER >100 HP Unit

12 WHEEL LOADER 1.0-1.8 M3 Unit

13 THREE WHEEL ROLLER 6-8 T Unit

14 TANDEM ROLLER 6-8 T. Unit


15 TIRE ROLLER 8-10 T. Unit

16 VIBRATORY ROLLER 10-13 T. Unit

17 CONCRETE VIBRATOR Unit

18 STONE CRUSHER Unit

19 WATER PUMP 70-100 mm Unit

20 WATER TANKER TRUCK Unit


21 CRANE TRUCK Unit

22 PEDESTRIAN ROLLER Unit

23 TRUCK MIXER Unit

24 STAMPER Unit

25 JACK HAMMER Unit

26 ROCK DRILL BREAKER Unit

27 KENDARAAN RODA DUA Unit

28 MINICRANE Set

Total untuk Item B pada Lembar 1 300,000.00


Sewa Tronton Angkut Alat ke Lokasi per 1 km 500,000.00

Jarak Angkut alat = Jarak Mobilisasi 50.00 KM

Maka Sewa angkut alat ke lap adalah Rp 5,000,000.00


PROGRAM : PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN
DAERAH KABUPATEN/KOTA
PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA
KEGIATAN :

### : #NAME?
PEKERJAAN : PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME SATUAN
(Rp) (Rp)

A Alat Pelindung Diri terdiri atas

1 Topi Pelindung (Safety Helmet) 50.00 Bh 70,000.00 3,500,000.00

2 Sepatu Keselamatan (Safety Shoes) 50.00 Psg 200,000.00 10,000,000.00

3 Rompi Keselamatan (Safety Vest) 50.00 Bh 60,000.00 3,000,000.00

Jumlah A 16,500,000.00
B Fasilitas Sarana Kesehatan dan Penanganan Covid 19

1 Peralatan P3K
- Kotak P3K 2.00 Bh 50,000.00 100,000.00
- Tandu Lipat 2.00 Bh 600,000.00 1,200,000.00
- Tabung Oksigen (1 m3) 1.00 Set 6,000,000.00 6,000,000.00
- Obat Luka 2.00 Ls 10,000.00 20,000.00
- Perban, dll 2.00 Ls 10,000.00 20,000.00

2 Pelindung Pernafasan dan Mulut (Masker) Sensi 2.00 Dos 160,000.00 320,000.00
3 Sarung Tangan (Safety Gloves) 10.00 Psg 30,000.00 300,000.00

4 Penyemprotan Disinfektan 2.00 Kali 100,000.00 200,000.00

Jumlah B 8,160,000.00

JUMLAH TOTAL 24,660,000.00


JUMLAH

HARGA

571,428.57 2,000,000.00

571,428.57 2,000,000.00

200,000.00 700,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

200,000.00 700,000.00

-
PROGRAM : PENYEDIAAN FASILITAS PELAYANAN KESEHATAN UNTUK UKM DAN UKP KEWENANGAN
DAERAH KABUPATEN/KOTA
PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA
KEGIATAN :
PEKERJAAN : PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
LOKASI : RSUD TRIKORA SALAKAN
TAHUN ANGGARAN : 2022
SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN KUANTITAS KETERANGAN
UKURAN (Rp) (Rp)

1 Penyiapan Dokumen RKK, RKPPL, RMLLP, RMPK :


Pembuatan Dokumen RKK, RKPPL, RMLLP, RMPK
a 1.00 Set 250,000.00 250,000.00 Memperhatikan Jumlah dan Jenis Pekerjaan yang
dikerjakan
b Pembuatan Prosedur dan Instruksi Kerja 1.00 Set 150,000.00 150,000.00

c Penyusunan Pelaporan Penerapan SMKK - Set - - Memperhatikan masa pelaksanaan pekerjaan

A Sub Total Penyiapan Dokumen RKK, RKPPL, RMLLP, RMPK Jumlah (a - c) 400,000.00

2 Sosialisasi, Promosi dan Pelatihan :

a Induksi Keselamatan Konstruksi (Safety Induction) 3.00 Org 100,000.00 300,000.00

Pengarahan Keselamatan Konstruksi (Safety Briefing)


b - Org - - Memeprhatikan jenis dan resiko pekerjaan

Pertemuan Keselamatan (Safety Talk dan/atau Tool Box


c 2.00 Org 100,000.00 200,000.00
Meeting

d Patroli Keselamatan Konstruksi - Durasi - - Memperhatikan jenis dan resiko pekerjaan

e Pelatihan Keselamatan Konstruksi, antara lain :

1). Bekerja di ketinggian 3.00 Org 200,000.00 600,000.00


2). Pengunaan Bahan Kimia (MSDS) - Org - -
Meperhatikan perkiraan jumlah pekerja serta jumlah
3). Analisis Keselamatan Pekerjaan 1.00 Org 30,000.00 30,000.00 dan jenis pekerjaan
Perilaku Berbasis Keselamatan (Budaya
4). 10.00 Org 15,000.00 150,000.00
berkeselamatan Konstruksi )

5). P3K 5.00 Org 200,000.00 1,000,000.00


f Sosialisasi / Penyuluhan / HIV/AIDS - Org - - Mperhatikan perkiraan jumlah pekerjaan
Meperhatikan perkiraan jumlah pekerjaan dan resiko
g Simulasi Keselamatan Konstruksi - Ls - -
keselamatan konstruksi pekerjaan

h Spanduk (Banner) 1.00 Lb 70,000.00 70,000.00

i Poster / Left - Lb - - Sesuai kebutuhan

j Papan Informasi Keselamatan Konstruksi 1.00 Bh 150,000.00 150,000.00


B Sub Total Penyiapan Dokumen RKK, RKPPL, RMLLP, RMPK Jumlah (a - j) 2,500,000.00

3 Alat Pelindung Kerja dan Alat Pelindung Diri :

a APK, antara lain : -


1). Jaring Pengaman (Safety Net) M1 - - Sesuai Kebutuhan

2). Pagar Pengaman (Guard Railing) - M - - Sesuai Kebutuhan

3). Penahan Jatuh (Safety Deck) 2.00 Unit 250,000.00 500,000.00 Sesuai Kebutuhan

4). Pembatas Area (Restricted Area) 1.00 Roll 150,000.00 150,000.00 Sesuai Kebutuhan

5). Perlengkapan Keselamatan Bencana Set - Sesuai Kebutuhan


b APD, antara lain : -
Memperhatikan perkiraan jumlah pekerja tamu dan
1). Topi Pelindung (Safety Helmet) 10.00 Bh 25,000.00 250,000.00 staff

2). Pelindung Mata (Goggles, Spectacles) 3.00 Bh - Sesuai Kebutuhan

3). Tameng Muka Bh - Sesuai Kebutuhan

4). Masker Selam (Bbreathing Apparatus) Bh - Sesuai Kebutuhan

5). Pelindung Telinga (Ear Plug, Ear Muff) Psg - Sesuai Kebutuhan
Pelindung pernafasan dan mulut (masker, masker
6). 15.00 Bh 5,000.00 75,000.00 Sesuai Kebutuhan
respirator)

7). Sarung Tangan (Safety Gloves) 3.00 Psg 10,000.00 30,000.00 Sesuai Kebutuhan
Sepatu Keselamatan (Safety Shoes, Rubber Safety Memperhatikan perkiraan jumlah pekerja tamu dan
8). 3.00 Psg 145,000.00 435,000.00
Shoes and Toe Cap) staff

9). Penunjang Seluruh Tubuh (Full Body Harnes) Bh - Sesuai Kebutuhan

10). Jakat Pelampung (Life Vest) Bh - Sesuai Kebutuhan


SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN KUANTITAS KETERANGAN
UKURAN (Rp) (Rp)

11). Rompi Keselamatan (Safety Vest) 10.00 Bh 25,000.00 250,000.00 Sesuai Kebutuhan

12). Celemek (Apron/Coveralls) Bh - Sesuai Kebutuhan


13). Pelindung Jatuh (Fall Arrester) 1.00 Bh 150,000.00 150,000.00 Sesuai Kebutuhan
C Sub Total Alat Pelindung Kerja dan Alat Pelindung Diri Jumlah (a - b) 1,840,000.00
4 Asuransi dan Perizinan :

a Asuransi (Construction All Risk / CAR) 1.00 Ls 3,000,000.00 3,000,000.00 Memperhatikan perkiraan jumlah pekerja dan nilai
pekerjaan
b Asuransi Pengiriman Peralatan 1.00 Unit 250,000.00 250,000.00 Memperhatikan jenis dan lokasi pekerjaan
D Sub Total Asuransi dan Perizinan Jumlah (a - b) 3,250,000.00
5 Personel Keselamatan Konstruksi :

Ahli K3 konstruksi atau ahli keselamatan konstruksi Pimpinan UKK selaku personel manajerial dibayar
a Org - oleh perusahaan, tidak dimasukkan kedalam
(sebagai pimpinan UKK/personil manajerial)
- - perhitungan biaya
b Ahli K3 konstruksi atau ahli keselamatan konstruksi - Org - - Memperhatikan Jenis Pekerjaan

c Petugas keselataman konstruksi, Petugas K3 Konstruksi Org - Memperhatikan Jenis Pekerjaan


- -
d Petugas Pengelolaan Lingkungan - Org - - Memperhatikan Jenis Pekerjaan

e Petugas tanggap darurat/petugas pemadam kebagakaran Org - Memperhatikan Jenis Pekerjaan


- -
f Petugas P3K - Org - - Memperhatikan Jenis Pekerjaan
Tenaga Medis dan/atau kesehatan (dokter atau
g Org - Memperhatikan Jenis Pekerjaan
paramedis) - -
h Petugas pengatus lalu lintas - Org - - Memperhatikan Jenis Pekerjaan

Koordinator manajemen dan keselamatan lalu lintas


i Org - Memperhatikan Jenis Pekerjaan
(KMKL) - -
E Sub Total Personel Keselamatan Konstruksi Jumlah (a - i) -
6 Fasilitasi Sarana, Prasarana dan alat Kesehatan :

a Peralatan P3K 1.00 Set 1,000,000.00 1,000,000.00 Memperhatikan perkiraan jumlah pekerja dan resiko
keselamatan konstruksi

b Ruang P3K - Set - - Memperhatikan perkiraan jumlah pekerja dan resiko


keselamatan konstruksi
c Peralatan Pengasapan (obat dan mesin fogging) - Unit - - Sesuai Kebutuhan

d - Ls - - Sesuai Kebutuhan
Biaya protokol kesehatan wabah menular (misal: tempat
cuci tangan, swab. Vitamin di masa pandemi Covid-19)
e Pemeriksanaan Psikotropika dan HIV - Org - - Sesuai Kebutuhan
f Perlengkapan isolasi mandiri - Set - - Sesuai Kebutuhan dan Resiko Keselamatan
Sesuai kebutuhan jenis, lokasi pekerjaan dan resiko
g Ambulans - Unit - - keselamatan konstruksi (SEWA)
F Sub Total Fasilitas Sarana dan Prasarana Kesehatan Jumlah (a - g) 1,000,000.00
7 Rambu dan Perlengkapan Lalu Lintas yang Diperlukan atau Manajemen Lalu Lintas:

a Rambu petunjuk - Bh - - Sesuai Kebutuhan


b Rambu larangan 1.00 Bh 55,000.00 55,000.00 Sesuai Kebutuhan
c Rambu peringatan - Bh - - Sesuai Kebutuhan
d Rambu kewajiban - Bh - - Sesuai Kebutuhan
e Rambu informasi 1.00 Bh 55,000.00 55,000.00 Sesuai Kebutuhan
f Rambu pekerjaan sementara 1.00 Bh 55,000.00 55,000.00 Sesuai Kebutuhan
g Jalur evakuasi (petunjuk escape route) - Bh - - Sesuai Kebutuhan
h Kerucut lalu lintas (traffic cone) - Bh - - Sesuai Kebutuhan
i Lampu putar (rotary lamp) - Bh - - Sesuai Kebutuhan
j Pembatas jalan (water barrier) - Bh - - Sesuai Kebutuhan
k Beton pembatas jalan (concrete barrier) - m - - Sesuai Kebutuhan
l Lampu/alat penerangan semetara - m - - Sesuai Kebutuhan
m Rambu / alat pemberi isyarat lalu lintas semetara - Bh - - Sesuai Kebutuhan
n Marka jalan sementara - Bh - - Sesuai Kebutuhan

o Alat pengendali pemakaian jalan semetara antara lain: Bh - Sesuai Kebutuhan


alat pembatas kecepatan, alat pembatas tinggi dan lebar
kendaraan) - -
Alat pengamanan pemakai jalan sementara, antara lain:
penghalang lalu lintas, cermin tikungan, patok
p Bh -
pengarah/delineator pulau-ulau lalu lintas sementara, pita
pengaduh/rumble strip - - Sesuai Kebutuhan
SATUAN HARGA SATUAN JUMLAH HARGA
NO URAIAN KUANTITAS KETERANGAN
UKURAN (Rp) (Rp)

q Alat penerangan sementara - Bh - - Sesuai Kebutuhan


r Jembatan sementara - Ls - - Sesuai Kebutuhan
G Sub Total Rambu-Rambu yang Diperlukan Jumlah (a - r) 165,000.00
8 Konsultasi dengan Ahli Terkait Keselamatan Konstruksi:

a Ahli lingkungan - OJ/OK - -

b Ahli jembatan - OJ/OK - -

c Ahli gedung - OJ/OK - -

d Ahli struktur - OJ/OK - -

e Ahli pondasi - OJ/OK - -

f Ahli bendungan - OJ/OK - -

g Ahli gempa - OJ/OK - -

h Ahli likuifaksi - OJ/OK - - Sesuai Jenis Pekerjaan dan Kebutuhan Lapangan


- termasuk ahli-ahli lainnya
i Ahli lapangan terbang - OJ/OK -
j Ahli mekanikal - OJ/OK - -

k Ahli pertambangan - OJ/OK - -

l Ahli peledakan - OJ/OK - -

m Ahli eketrikal - OJ/OK - -

n Ahli perminyakan - OJ/OK - -

o Ahli manajemen - OJ/OK - -

p Ahli proteksi kebakaran gedung - OJ/OK - -


H Sub Total Konsultasi dengan Ahli Terkait Keselamatan Konstruksi Jumlah (a - p) -
9 Kegiatan Peralatan Terkait Pengendalian Resiko Keselamatan Konstruksi:

a Alat pemadam api ringan (APAR) 1.00 Bh 1,500,000.00 1,500,000.00 Sesuai kebutuhan memperhatikan luasan dan kelas
kebakaran

b Penangkal petir - Bh - - Sesuai kebutuhan memperhatikan luasan dan kelas


kebakaran

c Anemometer - Bh - - Sesuai kebutuhan memperhatikan luasan dan kelas


kebakaran
d Bendera K3 1.00 Bh 100,000.00 100,000.00 Sesuai Kebutuhan

- Sesuai Kebutuhan dan memperhatiakan jumlah


e Pembuatan Kartu Identitas Pekerja (KIP) - Bh - pekerja
f Lampu darurat (Emergency lamp) - Bh - - Sesuai kebutuhan, jenis dan lokasi pekerjaan
g Pemeriksaan lingkungan/uji sampling antara lain: - - -
- Pengujian kualitas air, - - -
- Udara, - -
Sesuai kebutuhan memperhatikan jenis dan lokasi
- Kebisingan, - Titik Lokasi - - pekerjaan dan rekomendasi dokumen lingkungan
- Getaran, - - -
- Limbah B3, - - -
- Pencahayaan - -
h Audit eksternal - Periode - - Sesuai Kebutuhan

i CCTV - Unit - - Sesuai Kebutuhan

j Pengujian pH - Bh - - Sesuai Kebutuhan

k Pengujian oksigen terlarut (DO) - Bh - - Sesuai Kebutuhan

l Pengujian zat padat terlarut (TDS) - Bh - - Sesuai Kebutuhan

m Pengujian zat padat tersuspensi (TSS) - Bh - - Sesuai Kebutuhan

n Pengujian Biological oxygen Demand (BOD) - Bh - - Sesuai Kebutuhan

o Pengujian Chemical oxygen Demand (COD) - Bh - - Sesuai Kebutuhan

p Pengujian coliform metode petrifilm - Bh - Sesuai Kebutuhan

q Pengujian E.Coli Metode MPN - Bh - - Sesuai Kebutuhan

r Pengujian destruksi Cu, Pb, Cd, Ni, Fe, Zn, Ag, Co, Mn Bh - Sesuai Kebutuhan
- -
s Pengujian temperatur (suhu) - Bh - - Sesuai Kebutuhan

t Pengujian parameter kualitas air lainnya: ….... - Bh - - Sesuai Kebutuhan


Pengujian vibrasi lingkungan untuk kenyamanan dan
u Bh - Sesuai Kebutuhan
keselamatan - -
v Pengujian tingkat getaran kendaraan bermotor - Bh - - Sesuai Kebutuhan
Pengujian parameter kebisingan dan/atau getaran
w Bh - Sesuai Kebutuhan
lainnya: ….... - -

SATUAN HARGA SATUAN JUMLAH HARGA


NO URAIAN KUANTITAS KETERANGAN
UKURAN (Rp) (Rp)
x Pengujian nox - Bh - - Sesuai Kebutuhan

y Pengujian sulfurdioksida (SO2) - Bh - - Sesuai Kebutuhan

z Pengujian karbondioksida (CO2) - Bh - - Sesuai Kebutuhan

aa Hidro Carbon (HC) - CH4 - Bh - - Sesuai Kebutuhan

ab Pengujian Total partikulat (TSP) - Debu - Bh - - Sesuai Kebutuhan

ac Timah Hitam (pb) - Bh - - Sesuai Kebutuhan

ad Pengujian parameter udara emisi dan ambien lainnya: Bh - Sesuai Kebutuhan


…........ - -
Kegiatan dan Peralatan Terkait dengan Pengendalian Resiko Keselamatan
I Jumlah (a - ad) 1,600,000.00
Konstruksi

Total Mata Pembayaran Penerapan SMKK JUMLAH ( A - I ) 10,755,000.00


JUMLAH

HARGA

571,428.57 2,000,000.00

571,428.57 2,000,000.00

200,000.00 700,000.00
-

571,428.57 2,000,000.00

571,428.57 2,000,000.00

200,000.00 700,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00
-

571,428.57 2,000,000.00
571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00

571,428.57 2,000,000.00
JUMLAH

HARGA

571,428.57 2,000,000.00

571,428.57 2,000,000.00
571,428.57 2,000,000.00

-
JUMLAH

HARGA

JUMLAH

HARGA
-

-
SISTEM MANAJEMEN KESELAMATAN DAN KESEHATAN KERJA (SMK3)
PROGRAM :
KEGIATAN :
PEKERJAAN :
LOKASI :
### :
TAHUN ANGGARAN : 2022
HARGA JUMLAH
NO URAIAN SAT. VOL. WAKTU SATUAN HARGA KET.
(Rp.) (Rp.)
1 Penyiapan RK3K terdiri atas :
a Pembuatan Manual, Prosedur Set 1.00 1.00 250,000.00 250,000.00
Instruksi Kerja, Ijin Kerja
b Pembuatan Kartu Identitas Pekerja Org 25.00 1.00 5,000.00 125,000.00
(KIP)
Sub Jumlah 1 375,000.00
2 Sosialisasi dan Promosi K3 terdiri atas :
a Induksi K3 (Safety Induction); khusus untuk Org 25.00 1.00 5,000.00 125,000.00
pekerja baru
b Pengarahan K3 (Safety Brifing) : Org - - - -
Pertemuan Keselamatan (Safety Talk dan/atau
Tool Box Meeting); setiap hari
c Pelatihan K3:
Bekerja di Ketinggian Org 3.00 1.00 5,000.00 15,000.00
K3 Peralatan Konstruksi & Org 1.00 1.00 5,000.00 5,000.00
Penggunaan Bahan Kimia (MSDS)
Analysis Keselamatan Pekerjaan Org 1.00 1.00 5,000.00 5,000.00
Perilaku Berbasis Keselamatan Org 25.00 1.00 5,000.00 125,000.00
(Budaya K3)
P3K Org 1.00 1.00 350,000.00 350,000.00
d Simulasi K3 Org - - - -
e Spanduk (Banner) Lb 1.00 1.00 200,000.00 200,000.00
f Poster Lb - - - -
g Papan Informasi K3 Bh 1.00 1.00 150,000.00 150,000.00
Sub Jumlah 2 975,000.00
3 Alat Pelindung Kerja terdiri atas :
a Jaring Pengaman (Safety Net) Ls - - - -
b Tali Keselamatan (Life Line) Ls 1.00 1.00 150,000.00 150,000.00
c Penahan Jatuh (Safety Deck) Ls - - - -
d Pagar Pengaman Ls - - - -
e Pembatas Area (Restricted Area) Ls 1.00 1.00 150,000.00 150,000.00
Sub Jumlah 3 300,000.00
4 Alat Pelindung Diri terdiri atas :
a Topi Pelindung Bh 25.00 1.00 25,000.00 625,000.00 Pekerja dan Tamu
b Pelindung Mata (Goggles, Spectades) Psg 5.00 1.00 25,000.00 125,000.00
c Tameng Muka (Face Shield) Bh - - - -
d Masker Selam (Breathing Apparatus) Bh - - - -
e Pelindung Telinga (Ear Plug, Ear Muff) Psg - - - -
f Pelindung Pernafasan dan Mulut (Masker) Bh 25.00 1.00 5,000.00 125,000.00 Pekerja dan Tamu
g Sarung Tangan (Safety Gloves) Psg 5.00 1.00 5,000.00 25,000.00
h Sepatu Keselamatan (Safety Shoes) Psg 5.00 1.00 145,000.00 725,000.00
untuk Staf
HARGA JUMLAH
NO URAIAN SAT. VOL. WAKTU SATUAN HARGA KET.
(Rp.) (Rp.)
h Sepatu Keselamatan (Rubber Safety Shoes Psg 25.00 1.00 145,000.00 3,625,000.00
and Toe Cap
i Penunjang Seluruh Tubuh (Full Body Harness) Bh - - - -
j Jaket Pelampung (Life Vest) Bh - - - -
k Rompi Keselamatan (Safety Vest) Bh 25.00 1.00 25,000.00 625,000.00 Pekerja dan Tamu
l Celemek (Apron / Coveralls) Bh - - - -
m Pelindung Jatuh (Fall Arrester) Bh 1.00 1.00 100,000.00 100,000.00
Sub Jumlah 4 5,975,000.00
5 Asuransi dan Perijinan terdiri atas :
a BPJS Ketenagakerjaan dan Kesehatan Kerja ; Ls 1.00 1.00 3,000,000.00 3,000,000.00
(BERDASARKAN KEPMENAKER NOMOR :
KEP-196/MEN/1999, untuk Tenaga Harian
Proyek)
b Surat Ijin Kelaikan Alat; Alat/Kend 1.00 1.00 500,000.00 500,000.00
c Surat Ijin Operator; Lb/Alat 1.00 1.00 250,000.00 250,000.00
d Surat Ijin Pengesahan Panitia Pembina Ls 1.00 1.00 100,000.00 100,000.00
Keselamatan dan Kesehatan Kerja (P2K3);
Sub Jumlah 5 3,850,000.00
6 Personil K3 terdiri atas :
a Ahli K3 OB 1.00 4.00 2,500,000.00 10,000,000.00
b Petugas K3 OB 1.00 4.00 1,000,000.00 4,000,000.00
c Petugas Tanggap Darurat OB - - - -
d Petugas P3K OB - - - -
e Ass Petugas K3 / Safety Man / Pengatur Lalu OB 1.00 4.00 300,000.00 1,200,000.00
Lintas (Flagman)
f Petugas Medis OB - - - -
Sub Jumlah 6 15,200,000.00
7 Fasilitas Sarana Kesehatan :
a Peralatan P3k (Kotak P3K, Tandu, Tabung Ls 1.00 1.00 1,000,000.00 1,000,000.00
Oksigen, Obat Luka, Perban, dll)
b Ruang P3K (Tempat Tidur Pasien, Stetoskop, Ls - - - -
Timbangan Berat Badan, Tensi Meter, dll)
c Peralatan Pengasapan (Fogging) Bh - - - -
d Obat Pengasapan Kali - - - -
Sub Jumlah 7 1,000,000.00
8 Rambu-rambu terdiri atas :
a Rambu Petunjuk Bh 1.00 1.00 35,000.00 35,000.00
b Rambu Larangan Bh 1.00 1.00 35,000.00 35,000.00
c Rambu Peringatan Bh 1.00 1.00 35,000.00 35,000.00
d Rambu Kewajiban Bh 1.00 1.00 35,000.00 35,000.00
e Rambu Informasi Bh 1.00 1.00 35,000.00 35,000.00
f Rambu Pekerjaan Sementara Bh - 1.00 - -
g Tongkat Pengatur Lalu Lintas (Warning Bh - 1.00 - -
Lights Stick)
h Kerucur Lalu Lintas (Traffic Cone) Bh - 1.00 - -
i Lampu Putar (Rotary Lamp) Bh - 1.00 - -
j Lampu Selang Lalu Lintas Ls - 1.00 - -
Sub Jumlah 8 175,000.00
9 Lain-lain Terkait Pengendalian Resiko K3
a Alat Pemadam Api Ringan (APAR); 10 Kg Bh 1.00 1.00 500,000.00 500,000.00
b Sirine; Bh - - - -
c Bendera K3; Bh 1.00 1.00 150,000.00 150,000.00
d Jalur Evakuasi (Escape Route) Ls - - - -

HARGA JUMLAH
NO URAIAN SAT. VOL. WAKTU SATUAN HARGA KET.
NO URAIAN SAT. VOL. WAKTU KET.
(Rp.) (Rp.)
e Lampu Darurat (Emergency Lamp); Bh - - - -
f Program Inspeksi dan Audit Internal Org - - - -
g Pelaporan dan Penyelidikan Insiden Ls 1.00 1.00 100,000.00 100,000.00
Sub Jumlah 9 750,000.00

TOTAL BIAYA SMK3 28,600,000.00


JUMLAH
HARGA
(Rp.)

571,428.57 2,000,000.00
-
200,000.00 700,000.00
-
-
-
214,285.71 750,000.00
-
- -
-
-
- -
21,428.57 75,000.00
21,428.57 75,000.00
-
85,714.29 300,000.00
214,285.71 750,000.00
-
1,000,000.00 3,500,000.00
214,285.71 750,000.00
214,285.71 750,000.00
71,428.57 250,000.00
285,714.29 1,000,000.00
-
-
- -
285,714.29 1,000,000.00
- -
857,142.86 3,000,000.00
857,142.86 3,000,000.00
-
-
2,250,000.00 7,875,000.00
142,857.14 500,000.00
107,142.86 375,000.00
- -
- -
57,142.86 200,000.00
28,571.43 100,000.00
1,157,142.86 4,050,000.00
-
3,521,428.57 12,325,000.00
-
2,142,857.14 7,500,000.00
- -
714,285.71 2,500,000.00
57,142.86 200,000.00
285,714.29 1,000,000.00
-
-
3,983,716.57 13,943,008.00
-
-
-
2,428,571.43 8,500,000.00
1,857,142.86 6,500,000.00
142,857.14 500,000.00
-
-
-
12,000,000.00 42,000,000.00
6,857,142.86 24,000,000.00
- -
- -
5,142,857.14 18,000,000.00
7,963,136,818.00 -
- -
-
-
1,857,142.86 6,500,000.00
-
1,428,571.43 5,000,000.00
-
428,571.43 1,500,000.00
77,142.86 270,000.00
-
-
214,285.71 750,000.00
214,285.71 750,000.00
214,285.71 750,000.00
214,285.71 750,000.00
107,142.86 375,000.00
- -
- -
-
- -
- -
- -
-
-
628,571.43 2,200,000.00
28,571.43 100,000.00
28,571.43 100,000.00
142,857.14 500,000.00
80,000.00 280,000.00
1,142,857.14 4,000,000.00
142,857.14 500,000.00
-

0.82 54,940,859.43 192,293,008.00

3,500,000,000.00
1.57
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.1.1.1 HARGA SATUAN PEKERJAAN PERSIAPAN


A.1.1.1.11 Pembuatan 1 M2 Steger/Perancah dari Bambu s.d Tinggi 6 meter (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 2.0000 145,000.00 290,000.00
A
Kepala Tukang L.03 OH 0.2000 170,000.00 34,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 430,030.00
BAHAN
Bambu diameter 6 - 8/600 cm Batang 1.2500 14,700.00 18,375.00
B
Tali Ijuk M3 0.1860 31,500.00 5,859.00
JUMLAH HARGA BAHAN 24,234.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 454,264.00
E OVERHEAD & PROFIT ( 10% x D ) 45,426.40
F HARGA SATUAN PEKERJAAN ( D + E ) 499,690.40

A.1.1.1.15 Pembuatan 1 M2 Pagar BRC Galvanis (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0420 100,000.00 4,200.00
Tukang L.02 OH 0.0040 145,000.00 580.00
A
Kepala Tukang L.03 OH 0.0020 170,000.00 340.00
Mandor L.04 OH 0.0420 120,600.00 5,065.20
JUMLAH TENAGA KERJA 10,185.20
BAHAN
B Kawat Jaring Lbr 0.1434 346,500.00 49,688.10
JUMLAH HARGA BAHAN 49,688.10
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 59,873.30
E OVERHEAD & PROFIT ( 10% x D ) 5,987.33
F HARGA SATUAN PEKERJAAN ( D + E ) 65,860.63
A.1.1.1.16 Pemasangan 1 M2 Panel Beton Pracetak 50 x 50 x 240 Cm untuk Pagar (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3750 100,000.00 37,500.00
Tukang L.02 OH 0.1250 145,000.00 18,125.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0190 120,600.00 2,291.40
JUMLAH TENAGA KERJA 59,956.40
BAHAN
Panel Beton Pracetak Lbr 0.9860 -
Kolom Beton Pracetak Btg 0.5250 -
B Semen Portland Kg 45.0000 1,890.00 85,050.00
Pasir Beton M3 0.0740 279,300.00 20,668.20
Kerikil M3 0.1460 294,000.00 42,924.00
JUMLAH HARGA BAHAN 148,642.20
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 208,598.60
E OVERHEAD & PROFIT ( 10% x D ) 20,859.86
F HARGA SATUAN PEKERJAAN ( D + E ) 229,458.46

A.2.2.1.1 Pembuatan 1 M1 Pagar Sementara dari Kayu Tinggi 2 Meter (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Tukang Kayu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0200 120,600.00 2,412.00
JUMLAH TENAGA KERJA 74,812.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.2500 15,000.00 18,750.00
Semen Portland Kg 5.0000 1,890.00 9,450.00
Pasir Beton M3 0.0050 279,300.00 1,396.50
B Koral Beton M3 0.0090 288,700.00 2,598.30
Kayu 5/7 M3 0.0720 2,310,000.00 166,320.00
Paku Biasa 2” – 5” Kg 0.0600 42,000.00 2,520.00
Residu Ltr 0.4000 45,100.00 18,040.00
JUMLAH HARGA BAHAN 219,074.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 293,886.80
E OVERHEAD & PROFIT ( 10% x D ) 29,388.68
F HARGA SATUAN PEKERJAAN ( D + E ) 323,275.48

A.2.2.1.2 Pembuatan 1 M1 Pagar Sementara dari Seng Gelombang Tinggi 2 Meter (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.4000 145,000.00 58,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0200 120,600.00 2,412.00
JUMLAH TENAGA KERJA 83,812.00

BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.2500 15,000.00 18,750.00
Semen Portland Kg 2.5000 1,890.00 4,725.00
Seng Gelombang BJLS 28 Lbr 1.2000 73,500.00 88,200.00
B Pasir Beton M3 0.0050 279,300.00 1,396.50
Koral Beton M3 0.0090 288,700.00 2,598.30
Kayu 5/7 M3 0.0720 1,785,000.00 128,520.00
Paku Biasa 2” – 5” Kg 0.0600 42,000.00 2,520.00
JUMLAH HARGA BAHAN 246,709.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 330,521.80
E OVERHEAD & PROFIT ( 10% x D ) 33,052.18
F HARGA SATUAN PEKERJAAN ( D + E ) 363,573.98

A.2.2.1.3 Pembuatan 1 M1 Pagar Sementara dari Kawat Duri Tinggi 1.8 Meter (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.3000 145,000.00 43,500.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0200 120,600.00 2,412.00
JUMLAH TENAGA KERJA 69,312.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.0000 15,000.00 15,000.00
Semen Portland Kg 2.0000 1,890.00 3,780.00
Kawat Duri M1 25.0000 2,136.00 53,400.00
B
Pasir Beton M3 0.0050 279,300.00 1,396.50
Koral Beton M3 0.0090 288,700.00 2,598.30
Paku Biasa 2" - 5" Kg 0.0600 42,000.00 2,520.00
JUMLAH HARGA BAHAN 78,694.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 148,006.80
E OVERHEAD & PROFIT ( 10% x D ) 14,800.68
F HARGA SATUAN PEKERJAAN ( D + E ) 162,807.48

A.2.2.1.4 Pengukuran dan Pemasangan 1 M1 Bouwplank (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 26,803.00
BAHAN
Kayu Balok 5/7 Kelas III M3 0.0120 1,785,000.00 21,420.00
B Paku 2" - 3" Kg 0.0200 42,000.00 840.00
Kayu Papan 3/20 Kelas III M3 0.0070 1,785,000.00 12,495.00
JUMLAH HARGA BAHAN 34,755.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 61,558.00
E OVERHEAD & PROFIT ( 10% x D ) 6,155.80
F HARGA SATUAN PEKERJAAN ( D + E ) 67,713.80

A.2.2.1.5 Pembuatan 1 M2 Kantor Sementara Lantai Pelesteran (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.0000 100,000.00 200,000.00
Tukang Kayu L.02 OH 2.0000 145,000.00 290,000.00
A Tukang Batu L.02 OH 1.0000 145,000.00 145,000.00
Kepala Tukang L.03 OH 0.3000 170,000.00 51,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 692,030.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.2500 15,000.00 18,750.00
Kayu Kelas II M3 0.1800 2,310,000.00 415,800.00
Paku Biasa Kg 0.0800 42,000.00 3,360.00
Besi Strip Kg 1.1000 18,600.00 20,460.00
Semen Portland Kg 35.0000 1,890.00 66,150.00
Pasir Pasang M3 0.1500 279,300.00 41,895.00
Pasir Beton M3 0.1000 279,300.00 27,930.00
B
Koral Beton M3 0.1500 288,700.00 43,305.00
Bata Merah 9 Bh 30.0000 800.00 24,000.00
Seng Plat Lbr 0.2500 68,200.00 17,050.00
Jendela Nako Bh 0.2000 -
Kaca Polos 3 mm M2 0.0800 122,800.00 9,824.00
Kunci Tanam Bh 0.1500 99,700.00 14,955.00
Plywood 4 mm Lbr 0.0600 110,200.00 6,612.00
JUMLAH HARGA BAHAN 710,091.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,402,121.00
E OVERHEAD & PROFIT ( 10% x D ) 140,212.10
F HARGA SATUAN PEKERJAAN ( D + E ) 1,542,333.10

A.2.2.1.6 Pembuatan 1 M2 Rumah Jaga (Konstruksi Kayu) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 1.5000 145,000.00 217,500.00
A
Kepala Tukang L.03 OH 0.1500 170,000.00 25,500.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 349,030.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 3.0000 15,000.00 45,000.00
Kayu Kelas II M3 0.2760 2,310,000.00 637,560.00
B
Paku Biasa Kg 0.7000 42,000.00 29,400.00
Seng Gelombang Lbr 1.5000 54,600.00 81,900.00
JUMLAH HARGA BAHAN 793,860.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,142,890.00
E OVERHEAD & PROFIT ( 10% x D ) 114,289.00
F HARGA SATUAN PEKERJAAN ( D + E ) 1,257,179.00
A.2.2.1.7 Pembuatan 1 M2 Gudang Semen dan Peralatan (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 2.0000 145,000.00 290,000.00
A
Kepala Tukang L.03 OH 0.2000 170,000.00 34,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 430,030.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.7000 15,000.00 25,500.00
Kayu Kelas II M3 0.2100 2,310,000.00 485,100.00
Paku Biasa Kg 0.3000 42,000.00 12,600.00
Semen Portland Kg 10.5000 1,890.00 19,845.00
B
Pasir Beton M3 0.0300 279,300.00 8,379.00
Koral Beton M3 0.0500 288,700.00 14,435.00
Seng Gelombang Lbr 1.5000 54,600.00 81,900.00
Seng Plat Lbr 0.2500 68,200.00 17,050.00
JUMLAH HARGA BAHAN 664,809.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,094,839.00
E OVERHEAD & PROFIT ( 10% x D ) 109,483.90
F HARGA SATUAN PEKERJAAN ( D + E ) 1,204,322.90

A.2.2.1.8 Pembuatan 1 M2 Bedeng Pekerja (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 2.0000 145,000.00 290,000.00
A
Kepala Tukang L.03 OH 0.2000 170,000.00 34,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 430,030.00
BAHAN
Dolken Kayu φ 8 - 10/400 Cm Batang 1.2500 15,000.00 18,750.00
Kayu Kelas II M3 0.1860 2,310,000.00 429,660.00
Paku Biasa Kg 0.3000 42,000.00 12,600.00
Semen Portland Kg 18.0000 1,890.00 34,020.00
B
Pasir Beton M3 0.0300 279,300.00 8,379.00
Koral Beton M3 0.0500 288,700.00 14,435.00
Seng Gelombang Lbr 1.5000 54,600.00 81,900.00
Plywood 4 Mm Lbr 1.3500 110,200.00 148,770.00
JUMLAH HARGA BAHAN 748,514.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,178,544.00
E OVERHEAD & PROFIT ( 10% x D ) 117,854.40
F HARGA SATUAN PEKERJAAN ( D + E ) 1,296,398.40

A.2.2.1.9 Pembersihan 1 M2 Lapangan dan Perataan (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6670 100,000.00 66,700.00
A
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 70,679.80
BAHAN
B
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 70,679.80
E OVERHEAD & PROFIT ( 10% x D ) 7,067.98
F HARGA SATUAN PEKERJAAN ( D + E ) 77,747.78

A.2.2.1.11 Pembuatan 1 Buah Kotak Adukan Ukuran 40 Cm x 50 Cm x 25 Cm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Tukang Kayu L.02 OH 0.3000 100,000.00 30,000.00
A
Kepala Tukang L.03 OH 0.0300 170,000.00 5,100.00
JUMLAH TENAGA KERJA 35,100.00
BAHAN
Kayu Papan Kelas III M3 0.0360 1,785,000.00 64,260.00
B Kayu Balok 5/7 Kelas III M3 0.0140 1,785,000.00 24,990.00
Paku Biasa Kg 0.0800 42,000.00 3,360.00
JUMLAH HARGA BAHAN 92,610.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 127,710.00
E OVERHEAD & PROFIT ( 10% x D ) 12,771.00
F HARGA SATUAN PEKERJAAN ( D + E ) 140,481.00

A.2.2.1.12 Pembuatan 1 M2 Jalan Sementara (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
A
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 100,603.00
BAHAN
Batu Belah M3 0.1500 288,700.00 43,305.00
B Batu Pecah M3 0.0900 341,200.00 30,708.00
Pasir Pasang M3 0.0100 276,810.60 2,768.11
JUMLAH HARGA BAHAN 76,781.11
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 177,384.11
E OVERHEAD & PROFIT ( 10% x D ) 17,738.41
F HARGA SATUAN PEKERJAAN ( D + E ) 195,122.52

A.2.2.1.13 Pembongkaran 1 M3 Beton Bertulang (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 13.3340 100,000.00 1,333,400.00
A
Mandor L.04 OH 0.6660 120,600.00 80,319.60
JUMLAH TENAGA KERJA 1,413,719.60
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,413,719.60
E OVERHEAD & PROFIT ( 10% x D ) 141,371.96
F HARGA SATUAN PEKERJAAN ( D + E ) 1,555,091.56

A.2.2.1.14 Pembongkaran 1 M3 Dinding Tembok Bbata (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 6.6670 100,000.00 666,700.00
A
Mandor L.04 OH 0.3330 120,600.00 40,159.80
JUMLAH TENAGA KERJA 706,859.80
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 706,859.80
E OVERHEAD & PROFIT ( 10% x D ) 70,685.98
F HARGA SATUAN PEKERJAAN ( D + E ) 777,545.78

A.2.2.1.15 Pemasangan 1 M2 Papan Nama Proyek (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
Tukang L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.1000 170,000.00 17,000.00
Mandor L.04 OH 0.1000 120,600.00 12,060.00
JUMLAH TENAGA KERJA 108,060.00
BAHAN
Tripleks 3 mm Lbr 0.3000 57,700.00 17,310.00
Kayu 4/6 Kelas II M3 0.0300 2,310,000.00 69,300.00
B
Paku 2 - 5 Kg 0.2000 42,000.00 8,400.00
Baliho M2 0.7200 52,500.00 37,800.00
JUMLAH HARGA BAHAN 132,810.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 240,870.00
E OVERHEAD & PROFIT ( 10% x D ) 24,087.00
F HARGA SATUAN PEKERJAAN ( D + E ) 264,957.00
NO. 28/PRT/M/2018
Klik to
Uraian
EE
#REF!
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.1.5.1 HARGA SATUAN PEKERJAAN TANAH


A.1.5.1.13 Pemasangan 1 M2 Lapisan Ijuk Tebal 10 Cm untuk Bidang Resapan Tangki Septik (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
A
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 16,809.00
BAHAN
B Ijuk Kg 6.0000 31,500.00 189,000.00
JUMLAH HARGA BAHAN 189,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 205,809.00
E OVERHEAD & PROFIT ( 10% x D ) 20,580.90
F HARGA SATUAN PEKERJAAN ( D + E ) 226,389.90

A.2.3.1.1 Penggalian 1 M3 Tanah Biasa sedalam 1 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7500 100,000.00 75,000.00
A
Mandor L.04 OH 0.0250 120,600.00 3,015.00
JUMLAH TENAGA KERJA 78,015.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 78,015.00
E OVERHEAD & PROFIT ( 10% x D ) 7,801.50
F HARGA SATUAN PEKERJAAN ( D + E ) 85,816.50

A.2.3.1.2 Penggalian 1 M3 Tanah Biasa sedalam 2 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
A
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 95,427.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 95,427.00
E OVERHEAD & PROFIT ( 10% x D ) 9,542.70
F HARGA SATUAN PEKERJAAN ( D + E ) 104,969.70

A.2.3.1.3 Penggalian 1 M3 Tanah Biasa sedalam 3 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0500 100,000.00 105,000.00
A
Mandor L.04 OH 0.0670 120,600.00 8,080.20
JUMLAH TENAGA KERJA 113,080.20
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 113,080.20
E OVERHEAD & PROFIT ( 10% x D ) 11,308.02
F HARGA SATUAN PEKERJAAN ( D + E ) 124,388.22

A.2.3.1.4 Penggalian 1 M3 Tanah Keras sedalam 1 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
A
Mandor L.04 OH 0.0320 120,600.00 3,859.20
JUMLAH TENAGA KERJA 103,859.20
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 103,859.20
E OVERHEAD & PROFIT ( 10% x D ) 10,385.92
F HARGA SATUAN PEKERJAAN ( D + E ) 114,245.12

A.2.3.1.5 Penggalian 1 M3 Tanah Cadas sedalam 1 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
A
Mandor L.04 OH 0.0600 120,600.00 7,236.00
JUMLAH TENAGA KERJA 157,236.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 157,236.00
E OVERHEAD & PROFIT ( 10% x D ) 15,723.60
F HARGA SATUAN PEKERJAAN ( D + E ) 172,959.60

A.2.3.1.6 Penggalian 1 M3 Tanah Lumpur sedalam 1 M (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
A
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 125,427.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 125,427.00
E OVERHEAD & PROFIT ( 10% x D ) 12,542.70
F HARGA SATUAN PEKERJAAN ( D + E ) 137,969.70

A.2.3.1.7 Pengerjaan Striping 1 M2 Tanah Tebing setinggi 1 Meter (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
A
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 5,603.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 5,603.00
E OVERHEAD & PROFIT ( 10% x D ) 560.30
F HARGA SATUAN PEKERJAAN ( D + E ) 6,163.30

A.2.3.1.8 Pembuangan Tanah 1 M3 Tanah sejauh 30 Meter (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3300 100,000.00 33,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 34,206.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 34,206.00
E OVERHEAD & PROFIT ( 10% x D ) 3,420.60
F HARGA SATUAN PEKERJAAN ( D + E ) 37,626.60

A.2.3.1.9 Pengurugan Kembali 1 M3 Galian Tanah (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA

A
Pekerja L.01 OH 0.5000 100,000.00 50,000.00
A
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 56,030.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 56,030.00
E OVERHEAD & PROFIT ( 10% x D ) 5,603.00
F HARGA SATUAN PEKERJAAN ( D + E ) 61,633.00

A.2.3.1.10 Pemadatan Tanah 1 M3 Tanah (Per 20 Cm) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
A
Mandor L.04 OH 0.0800 120,600.00 9,648.00
JUMLAH TENAGA KERJA 34,648.00
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C Stamper Jam 0.02100 100,000.00 2,100.00
JUMLAH HARGA ALAT 2,100.00
D JUMLAH ( A + B + C ) 36,748.00
E OVERHEAD & PROFIT ( 10% x D ) 3,674.80
F HARGA SATUAN PEKERJAAN ( D + E ) 40,422.80

A.2.3.1.11 Pengurugan 1 M3 dengan Pasir Urug (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 31,206.00
BAHAN
B Pasir Urug M3 1.2000 183,700.00 220,440.00
JUMLAH HARGA BAHAN 220,440.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 251,646.00
E OVERHEAD & PROFIT ( 10% x D ) 25,164.60
F HARGA SATUAN PEKERJAAN ( D + E ) 276,810.60

A.2.3.1.12 Pemasangan 1 M3 Lapisan Pudel Campuran 1 KP : 3 PP : 7 TL (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang L.02 OH 0.4000 145,000.00 58,000.00
A
A
Kepala Tukang L.03 OH 0.0400 170,000.00 6,800.00
Mandor L.04 OH 0.0800 120,600.00 9,648.00
JUMLAH TENAGA KERJA 154,448.00
BAHAN
Kapur Padam M3 0.1350 241,500.00 32,602.50
B Pasir Pasang M3 0.4000 279,300.00 111,720.00
Tanah Liat M3 0.9480 131,200.00 124,377.60
JUMLAH HARGA BAHAN 268,700.10
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 423,148.10
E OVERHEAD & PROFIT ( 10% x D ) 42,314.81
F HARGA SATUAN PEKERJAAN ( D + E ) 465,462.91

A.2.3.1.14 Pengurugan 1 M3 Sirtu Padat (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
A
Mandor L.04 OH 0.0250 120,600.00 3,015.00
JUMLAH TENAGA KERJA 28,015.00
BAHAN
B Sirtu / Material Timbunan M3 1.2000 47,200.00 56,640.00
JUMLAH HARGA BAHAN 56,640.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 84,655.00
E OVERHEAD & PROFIT ( 10% x D ) 8,465.50
F HARGA SATUAN PEKERJAAN ( D + E ) 93,120.50

A.2.3.1.15 Penggalian 1 M3 Tanah menggunakan Excavator (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2260 100,000.00 22,600.00
A
Mandor L.04 OH 0.0070 120,600.00 844.20
JUMLAH TENAGA KERJA 23,444.20
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C Excavator Jam 0.07600 500,000.00 38,000.00
JUMLAH HARGA ALAT 38,000.00
D JUMLAH ( A + B + C ) 61,444.20
E OVERHEAD & PROFIT ( 10% x D ) 6,144.42
F HARGA SATUAN PEKERJAAN ( D + E ) 67,588.62

A.2.3.1.16 Pengeboran 1 M3 dengan Minicrane, diameter 30 Cm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
A Tukang Batu L.02 OH 0.7000 145,000.00 101,500.00
Mandor L.04 OH 0.0770 120,600.00 9,286.20
JUMLAH TENAGA KERJA 210,786.20
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
Minicrane Jam 1.00000 350,000.00 350,000.00
C
Alat Bantu Ls 1.00000 2,500.00 2,500.00
JUMLAH HARGA ALAT 350,000.00
D JUMLAH ( A + B + C ) 560,786.20
E OVERHEAD & PROFIT ( 10% x D ) 56,078.62
F HARGA SATUAN PEKERJAAN ( D + E ) 616,864.82

A.2.3.1.17 1 M3 Penimbunan Tanah Mekanis (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0298 100,000.00 2,984.84
A
Mandor L.04 OH 0.0075 120,600.00 899.93
JUMLAH TENAGA KERJA 3,884.77
BAHAN
B Bahan Timbunan (Quarry) M3 1.2000 15,733.33 18,880.00
JUMLAH HARGA BAHAN 18,880.00
PERALATAN
Excavator Jam 0.04190 500,000.00 20,950.00
Dump Truck Jam 0.08830 300,000.00 26,490.00
C Motor Grader Jam 0.00200 500,000.00 1,000.00
Vibro Roller Jam 0.00040 400,000.00 160.00
Alat Bantu Ls 1.00000 2,500.00 2,500.00
JUMLAH HARGA ALAT 51,100.00
D JUMLAH ( A + B + C ) 73,864.77
E OVERHEAD & PROFIT ( 10% x D ) 7,386.48
F HARGA SATUAN PEKERJAAN ( D + E ) 81,251.25

A.2.3.1.17 1 M3 Penimbunan Tanah Pilihan (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0298 100,000.00 2,984.84
A
Mandor L.04 OH 0.0075 120,600.00 899.93
JUMLAH TENAGA KERJA 3,884.77
BAHAN
B Tanah Pilihan M3 1.2000 131,200.00 157,440.00
JUMLAH HARGA BAHAN 157,440.00

PERALATAN
Excavator Jam 0.04190 500,000.00 20,950.00
Dump Truck Jam 0.08830 300,000.00 26,490.00
C Motor Grader Jam 0.00200 500,000.00 1,000.00
Vibro Roller Jam 0.00040 400,000.00 160.00
Alat Bantu Ls 1.00000 2,500.00 2,500.00
JUMLAH HARGA ALAT 51,100.00
D JUMLAH ( A + B + C ) 212,424.77
E OVERHEAD & PROFIT ( 10% x D ) 21,242.48
F HARGA SATUAN PEKERJAAN ( D + E ) 233,667.25
ITEM PEMBAYARAN NO. : 3.1.(3) Analisa EI-313
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara manual
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -

II. URUTAN KERJA


1 Cadas muda yg dipotong umumnya berada disisi jalan
2 Penggalian dilakukan dengan kombinasi Excavator dan Breaker untuk
uniaxial strenght > 12,5 MPa
3 Selanjutnya dimuat ke dlm Truk
4 Dump Truck membuang material hasil galian keluar
Disesuaikan dengan
lokasi jalan sejauh : L 5.00 Km kondisi dilapangan sesuai
ketentuan Pasal 1.5.3
III. PEMAKAIAN BAHAN, ALAT DAN TENAGA

1. BAHAN
Tidak ada bahan yang diperlukan

2. ALAT

2.a. EXCAVATOR (E10)


Kapasitas Bucket V 0.93 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi alat Fa 0.83
Faktor konversi , kedalaman 40 %-75 %, Normal Fv 1.00
Waktu siklus Ts1 menit
- Menggali , memuat T1 0.120 menit
- Lain lain T2 0.040 menit
Waktu siklus = T1 x Fv Ts1 0.16 menit Permen PUPR
No 28/PRT/M/2016

Kap. Prod. / jam = V x Fb x Fa x 60 x Fk Q1 312.62 M3/Jam


Ts1 x Fv

Koefisien Alat / M3 = 1 : Q1 (E10) 0.0032 Jam

2.b. ROCK DRILL BREAKER (E37) Sesuai kondisi lapangan


Diameter Breaker 11.50 cm
Kapasitas Breaker V 0.70 M3
Faktor Breaker Fb 1.00 -
Faktor Efisiensi alat Fa 0.83
Waktu siklus Ts1 menit
- Memahat T1 2.000 menit
- Lain lain T2 0.200 menit
Waktu siklus = T1 x Fv Ts1 2.20 menit

Kap. Prod. / jam = V x Fb x Fa x 60 Q1 15.85 M3/Jam


Ts1

Koefisien Alat / M3 = 1 : Q1 (E37) 0.0631 Jam

2.c.. DUMP TRUCK 6- 8 M3 (E09)


Kapasitas bak V 8.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 35.00 KM/Jam
Waktu siklus Ts2 menit
- Muat = (V/Q1) x 60 T1 30.29 menit
- Waktu tempuh isi = (L : v1) x 60 T2 4.80 menit
- Waktu tempuh kosong = (L : v2) x 60 T3 3.43 menit
- Lain-lain T4 1.00 menit
Ts2 39.52 menit

Kapasitas Produksi / Jam = V x Fa x 60 Q2 8.40 M3/Jam


Fk x Ts2

Koefisien Alat / m3 = 1 : Q2 (E09) 0.1190 Jam

2.d. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Pahat / Tatah
- Palu Besar

3. TENAGA
Produksi menentukan : EXCAVATOR Q1 312.62 M3/Jam
Produksi Galian / hari = Tk x Q1 Qt 2,188.34 M3
Kebutuhan tenaga :
- Pekerja P 8.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0256 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0032 Jam
Berlanjut ke halaman berikut
ITEM PEMBAYARAN NO. : 3.1.(3) Analisa EI-313
JENIS PEKERJAAN : Galian Batu
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 33,461.32 / M3

6. WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ............ bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 0.00 M3
Analisa EI-313
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. : 3.1.(3) PERKIRAAN VOL. PEK. :
JENIS PEKERJAAN : Galian Batu TOTAL HARGA (Rp.) :
SATUAN PEMBAYARAN : M3 % THD. BIAYA PROYEK :

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0256 14,285.71 365.57


2. Mandor (L03) Jam 0.0032 17,228.57 55.11

JUMLAH HARGA TENAGA 420.68

B. BAHAN

JUMLAH HARGA BAHAN 0.00

C. PERALATAN

1. Excavator (E10) Jam 0.0032 500,000.00 1,599.39


2. Rock Drill Breaker (E37) Jam 0.0631 450,000.00 28,399.31
3. Dump Truck (E09) Jam 0.1190 0.00 0.00

JUMLAH HARGA PERALATAN 29,998.70

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 30,419.38


E. OVERHEAD & PROFIT 10.0 % x D 3,041.94
F. HARGA SATUAN PEKERJAAN ( D + E ) 33,461.32
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEKERJAAN : PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.3.1.1 HARGA SATUAN PEKERJAAN PONDASI


A.3.2.1.9 Pemasangan 1 M3 Batu Kosong (Aanstamping) untuk Pondasi Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7800 100,000.00 78,000.00
Tukang Batu L.02 OH 0.3900 145,000.00 56,550.00
A
Kepala Tukang L.03 OH 0.0390 170,000.00 6,630.00
Mandor L.04 OH 0.0390 120,600.00 4,703.40
JUMLAH TENAGA KERJA 145,883.40
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B
Pasir Urug M3 0.4320 183,700.00 79,358.40
JUMLAH HARGA BAHAN 425,798.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 571,681.80
E OVERHEAD & PROFIT ( 10% x D ) 57,168.18
F HARGA SATUAN PEKERJAAN ( D + E ) 628,849.98

A.3.2.1.1 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 3 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B Semen Portland Kg 202.0000 1,890.00 381,780.00
Pasir Pasang M3 0.4850 279,300.00 135,460.50
JUMLAH HARGA BAHAN 863,680.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,144,225.50
E OVERHEAD & PROFIT ( 10% x D ) 114,422.55
F HARGA SATUAN PEKERJAAN ( D + E ) 1,258,648.05
A.3.2.1.2 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 4 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B Semen Portland Kg 163.0000 1,890.00 308,070.00
Pasir Pasang M3 0.5200 279,300.00 145,236.00
JUMLAH HARGA BAHAN 799,746.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,080,291.00
E OVERHEAD & PROFIT ( 10% x D ) 108,029.10
F HARGA SATUAN PEKERJAAN ( D + E ) 1,188,320.10

A.3.2.1.3 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 5 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B Semen Portland Kg 136.0000 1,890.00 257,040.00
Pasir Pasang M3 0.5440 279,300.00 151,939.20
JUMLAH HARGA BAHAN 755,419.20
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,035,964.20
E OVERHEAD & PROFIT ( 10% x D ) 103,596.42
F HARGA SATUAN PEKERJAAN ( D + E ) 1,139,560.62

A.3.2.1.4 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 6 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B Semen Portland Kg 117.0000 1,890.00 221,130.00
Pasir Pasang M3 0.5610 279,300.00 156,687.30
JUMLAH HARGA BAHAN 724,257.30

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,004,802.30
E OVERHEAD & PROFIT ( 10% x D ) 100,480.23
F HARGA SATUAN PEKERJAAN ( D + E ) 1,105,282.53

A.3.2.1.5 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 8 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
B Semen Portland Kg 91.0000 1,890.00 171,990.00
Pasir Pasang M3 0.5840 279,300.00 163,111.20
JUMLAH HARGA BAHAN 681,541.20
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 962,086.20
E OVERHEAD & PROFIT ( 10% x D ) 96,208.62
F HARGA SATUAN PEKERJAAN ( D + E ) 1,058,294.82

A.3.2.1.6 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 1 KP : 2 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
Kapur M3 0.1700 241,500.00 41,055.00
B
Semen Portland Kg 170.0000 1,890.00 321,300.00
Pasir Pasang M3 0.3400 279,300.00 94,962.00
JUMLAH HARGA BAHAN 803,757.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,084,302.00
E OVERHEAD & PROFIT ( 10% x D ) 108,430.20
F HARGA SATUAN PEKERJAAN ( D + E ) 1,192,732.20

A.3.2.1.7 Pemasangan 1 M3 Pondasi Batu Belah campuran 1 SP : 3 KP : 10 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA

A
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
Kapur M3 0.1470 241,500.00 35,500.50
B
Semen Portland Kg 61.0000 1,890.00 115,290.00
Pasir Pasang M3 0.4920 279,300.00 137,415.60
JUMLAH HARGA BAHAN 634,646.10
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 915,191.10
E OVERHEAD & PROFIT ( 10% x D ) 91,519.11
F HARGA SATUAN PEKERJAAN ( D + E ) 1,006,710.21

A.3.2.1.8 Pemasangan 1 M3 Pondasi Batu Belah campuran 1/4 SP : 1 KP : 4 PP (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.5000 100,000.00 150,000.00
Tukang Batu L.02 OH 0.7500 145,000.00 108,750.00
A
Kepala Tukang L.03 OH 0.0750 170,000.00 12,750.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 280,545.00
BAHAN
Batu Belah M3 1.2000 288,700.00 346,440.00
Kapur M3 0.1310 241,500.00 31,636.50
B
Semen Portland Kg 41.0000 1,890.00 77,490.00
Pasir Pasang M3 0.5230 279,300.00 146,073.90
JUMLAH HARGA BAHAN 601,640.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 882,185.40
E OVERHEAD & PROFIT ( 10% x D ) 88,218.54
F HARGA SATUAN PEKERJAAN ( D + E ) 970,403.94

A.3.2.1.10 Pemasangan 1 M3 Pondasi Siklop, 60 % Beton Campuran 1 SP : 2 PB : 3 KR dan 40 % Batu Belah


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 3.4000 100,000.00 340,000.00
Tukang Batu L.02 OH 0.8500 145,000.00 123,250.00
A
Kepala Tukang L.03 OH 0.0850 170,000.00 14,450.00
Mandor L.04 OH 0.1700 120,600.00 20,502.00
JUMLAH TENAGA KERJA 498,202.00

BAHAN
Batu Belah M3 0.4800 288,700.00 138,576.00
Semen Portland Kg 194.0000 1,890.00 366,660.00
Pasir Beton M3 0.3120 279,300.00 87,141.60
B
Kerikil M3 0.4680 294,000.00 137,592.00
Besi Beton Kg 126.0000 18,600.00 2,343,600.00
Kawat Beton Kg 1.8000 23,100.00 41,580.00
JUMLAH HARGA BAHAN 3,115,149.60
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 3,613,351.60
E OVERHEAD & PROFIT ( 10% x D ) 361,335.16
F HARGA SATUAN PEKERJAAN ( D + E ) 3,974,686.76

A.3.2.1.11 Pemasangan 1 M3 Pondasi Sumuran, Diameter 100 Cm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.4000 100,000.00 240,000.00
Tukang Batu L.02 OH 0.8000 145,000.00 116,000.00
A
Kepala Tukang L.03 OH 0.0800 170,000.00 13,600.00
Mandor L.04 OH 0.1190 120,600.00 14,351.40
JUMLAH TENAGA KERJA 383,951.40
BAHAN
Batu Belah M3 0.4500 288,700.00 129,915.00
Semen Portland Kg 194.0000 1,890.00 366,660.00
B
Pasir Beton M3 0.3120 279,300.00 87,141.60
Kerikil M3 0.4680 294,000.00 137,592.00
JUMLAH HARGA BAHAN 721,308.60
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,105,260.00
E OVERHEAD & PROFIT ( 10% x D ) 110,526.00
F HARGA SATUAN PEKERJAAN ( D + E ) 1,215,786.00

A.3.2.1.12 Pemasangan 1 M3 Pondasi Bata Rollag 1 : 3 (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Batu Bata Merah Bh 70.0000 1,000.00 70,000.00
B Semen Portland Zak 0.2870 94,500.00 27,121.50
Pasir Beton M3 0.0400 279,300.00 11,172.00
JUMLAH HARGA BAHAN 108,293.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 156,302.50
E OVERHEAD & PROFIT ( 10% x D ) 15,630.25
F HARGA SATUAN PEKERJAAN ( D + E ) 171,932.75
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.1.1 HARGA SATUAN PEKERJAAN BETON


A.4.1.1.1 Pembuatan 1 M3 Beton Mutu f'c = 7,4 Mpa (K 100) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 247.0000 1,890.00 466,830.00
Pasir Pasang Kg 869.0000 199.50 173,365.50
B
Kerikil (Maks 30 mm) Kg 999.0000 217.78 217,560.00
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 859,905.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,079,550.30
E OVERHEAD & PROFIT ( 10% x D ) 107,955.03
F HARGA SATUAN PEKERJAAN ( D + E ) 1,187,505.33

A.4.1.1.2 Pembuatan 1 M3 Beton Mutu f'c = 9,8 Mpa (K 125) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 276.0000 1,890.00 521,640.00
Pasir Pasang Kg 828.0000 199.50 165,186.00
B
Kerikil (Maks 30 mm) Kg 1,012.0000 217.78 220,391.11
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 909,367.11
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,129,011.91
E OVERHEAD & PROFIT ( 10% x D ) 112,901.19
F HARGA SATUAN PEKERJAAN ( D + E ) 1,241,913.10
A.4.1.1.3 Pembuatan 1 M3 Beton Mutu f'c = 12,2 Mpa (K 150) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 299.0000 1,890.00 565,110.00
Pasir Pasang Kg 799.0000 199.50 159,400.50
B
Kerikil (Maks 30 mm) Kg 1,017.0000 217.78 221,480.00
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 948,140.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,167,785.30
E OVERHEAD & PROFIT ( 10% x D ) 116,778.53
F HARGA SATUAN PEKERJAAN ( D + E ) 1,284,563.83

A.4.1.1.5 Pembuatan 1 M3 Beton Mutu f'c = 14,5 Mpa (K 175) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 326.0000 1,890.00 616,140.00
Pasir Pasang Kg 760.0000 199.50 151,620.00
B
Kerikil (Maks 30 mm) Kg 1,029.0000 217.78 224,093.33
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 994,003.33
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,213,648.13
E OVERHEAD & PROFIT ( 10% x D ) 121,364.81
F HARGA SATUAN PEKERJAAN ( D + E ) 1,335,012.95

A.4.1.1.6 Pembuatan 1 M3 Beton Mutu f'c = 16,9 Mpa (K 200) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 352.0000 1,890.00 665,280.00
Pasir Pasang Kg 731.0000 199.50 145,834.50
B
Kerikil (Maks 30 mm) Kg 1,031.0000 217.78 224,528.89
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,037,793.39

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,257,438.19
E OVERHEAD & PROFIT ( 10% x D ) 125,743.82
F HARGA SATUAN PEKERJAAN ( D + E ) 1,383,182.01

A.4.1.1.7 Pembuatan 1 M3 Beton Mutu f'c = 19,3 Mpa (K 225 (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 371.0000 1,890.00 701,190.00
Pasir Pasang Kg 698.0000 199.50 139,251.00
B
Kerikil (Maks 30 mm) Kg 1,047.0000 217.78 228,013.33
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,070,604.33
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,290,249.13
E OVERHEAD & PROFIT ( 10% x D ) 129,024.91
F HARGA SATUAN PEKERJAAN ( D + E ) 1,419,274.05

A.4.1.1.8 Pembuatan 1 M3 Beton Mutu f'c = 21,7 Mpa (K 250) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 384.0000 1,890.00 725,760.00
Pasir Pasang Kg 692.0000 199.50 138,054.00
B
Kerikil (Maks 30 mm) Kg 1,039.0000 217.78 226,271.11
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,092,235.11
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,311,879.91
E OVERHEAD & PROFIT ( 10% x D ) 131,187.99
F HARGA SATUAN PEKERJAAN ( D + E ) 1,443,067.90

A.4.1.1.9 Pembuatan 1 M3 Beton Mutu f'c = 24,0 Mpa (K 275) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 406.0000 1,890.00 767,340.00
Pasir Pasang Kg 684.0000 199.50 136,458.00
B
Kerikil (Maks 30 mm) Kg 1,026.0000 217.78 223,440.00
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,129,388.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,349,032.80
E OVERHEAD & PROFIT ( 10% x D ) 134,903.28
F HARGA SATUAN PEKERJAAN ( D + E ) 1,483,936.08

A.4.1.1.10 Pembuatan 1 M3 Beton Mutu f'c = 26,4 Mpa (K 300) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6500 100,000.00 165,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
A
Kepala Tukang L.03 OH 0.0280 170,000.00 4,760.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 219,644.80
BAHAN
Semen Portland Kg 413.0000 1,890.00 780,570.00
Pasir Pasang Kg 681.0000 199.50 135,859.50
B
Kerikil (Maks 30 mm) Kg 1,021.0000 217.78 222,351.11
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,140,930.61
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,360,575.41
E OVERHEAD & PROFIT ( 10% x D ) 136,057.54
F HARGA SATUAN PEKERJAAN ( D + E ) 1,496,632.95

A.4.1.1.13 Pembuatan 1 M3 Beton Kedap Air dengan Aditif Kedap Air (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.1000 100,000.00 210,000.00
Tukang Batu L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.1050 120,600.00 12,663.00
JUMLAH TENAGA KERJA 279,363.00

BAHAN
Semen Portland Kg 400.0000 1,890.00 756,000.00
Pasir Beton M3 0.4800 279,300.00 134,064.00
B Kerikil (2 Cm / 3 Cm) M3 0.8000 294,000.00 235,200.00
Storox - 100 Kg 1.2000 50,400.00 60,480.00
Air L 210.0000 10.00 2,100.00
JUMLAH HARGA BAHAN 1,187,844.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,467,207.00
E OVERHEAD & PROFIT ( 10% x D ) 146,720.70
F HARGA SATUAN PEKERJAAN ( D + E ) 1,613,927.70

A.4.1.1.17 Pemasangan 1 Kg Jaring Anyaman Tulangan Tunggal (Wiremesh) M6 - M8 (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0025 100,000.00 250.00
Tukang Besi L.02 OH 0.0025 145,000.00 362.50
A
Kepala Tukang L.03 OH 0.0025 170,000.00 425.00
Mandor L.04 OH 0.0001 120,600.00 12.06
JUMLAH TENAGA KERJA 1,049.56
BAHAN
Jaring Anyaman Tunggal M6 - M8 Kg 1.0200 12,649.60 12,902.59
B
Kawat Benrad Kg 0.0050 23,100.00 115.50
JUMLAH HARGA BAHAN 13,018.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 14,067.65
E OVERHEAD & PROFIT ( 10% x D ) 1,406.76
F HARGA SATUAN PEKERJAAN ( D + E ) 15,474.41

A.4.1.1.18 Pemasangan 1 M2 Bekisitng untuk Pondasi Telapak Beton Bangunan (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.5200 100,000.00 52,000.00
Tukang Kayu L.02 OH 0.2600 145,000.00 37,700.00
A
Kepala Tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 120,600.00 3,135.60
JUMLAH TENAGA KERJA 97,255.60
BAHAN
Kayu Kelas III M3 0.0400 1,785,000.00 71,400.00
B Paku 5 - 10 Cm Kg 0.3000 42,000.00 12,600.00
Minyak Bekisting Liter 0.1000 31,500.00 3,150.00
JUMLAH HARGA BAHAN 87,150.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 184,405.60
E OVERHEAD & PROFIT ( 10% x D ) 18,440.56
F HARGA SATUAN PEKERJAAN ( D + E ) 202,846.16

A.4.1.1.19 Pemasangan 1 M2 Bekisitng untuk Sloof Beton Bangunan Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.5200 100,000.00 52,000.00
Tukang Kayu L.02 OH 0.2600 145,000.00 37,700.00
A
Kepala Tukang L.03 OH 0.0260 170,000.00 4,420.00
Mandor L.04 OH 0.0260 120,600.00 3,135.60
JUMLAH TENAGA KERJA 97,255.60
BAHAN
Kayu Kelas III M3 0.0450 1,785,000.00 80,325.00
B Paku 5 - 10 Cm Kg 0.3000 42,000.00 12,600.00
Minyak Bekisting Liter 0.1000 31,500.00 3,150.00
JUMLAH HARGA BAHAN 96,075.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 193,330.60
E OVERHEAD & PROFIT ( 10% x D ) 19,333.06
F HARGA SATUAN PEKERJAAN ( D + E ) 212,663.66

A.4.1.1.20 Pemasangan 1 M2 Bekisitng untuk Kolom Beton Bangunan Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
A
Kepala Tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 123,439.80
BAHAN
Kayu Kelas III M3 0.0400 1,785,000.00 71,400.00
Paku 5 - 12 Cm Kg 0.4000 42,000.00 16,800.00
Minyak Bekisting Liter 0.2000 31,500.00 6,300.00
B
Balok Kayu Kelas II M3 0.0150 2,310,000.00 34,650.00
Plywood Tebal 9 mm Lbr 0.3500 110,200.00 38,570.00
Dolken Kayu φ 8 - 10/400 Cm Batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 197,720.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 321,159.80
E OVERHEAD & PROFIT ( 10% x D ) 32,115.98
F HARGA SATUAN PEKERJAAN ( D + E ) 353,275.78

A.4.1.1.21 Pemasangan 1 M2 Bekisitng untuk Balok Beton Bangunan Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
A
Kepala Tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 123,439.80

BAHAN
Kayu Kelas III M3 0.0400 1,785,000.00 71,400.00
Paku 5 - 12 Cm Kg 0.4000 42,000.00 16,800.00
Minyak Bekisting Liter 0.2000 31,500.00 6,300.00
B
Balok Kayu Kelas II M3 0.0180 2,310,000.00 41,580.00
Plywood Tebal 9 mm Lbr 0.3500 110,200.00 38,570.00
Dolken Kayu φ 8 - 10/400 Cm Batang 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 204,650.00
PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 328,089.80
E OVERHEAD & PROFIT ( 10% x D ) 32,808.98
F HARGA SATUAN PEKERJAAN ( D + E ) 360,898.78

A.4.1.1.22 Pemasangan 1 M2 Bekisitng untuk Plat Lantai Beton Bangunan Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
A
Kepala Tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 123,439.80
BAHAN
Kayu Kelas III M3 0.0400 1,785,000.00 71,400.00
Paku 5 - 12 Cm Kg 0.4000 42,000.00 16,800.00
Minyak Bekisting Liter 0.2000 31,500.00 6,300.00
B
Balok Kayu Kelas II M3 0.0150 2,310,000.00 34,650.00
Plywood Tebal 9 mm Lbr 0.3500 110,200.00 38,570.00
Dolken Kayu φ 8 - 10/400 Cm Batang 6.0000 15,000.00 90,000.00
JUMLAH HARGA BAHAN 257,720.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 381,159.80
E OVERHEAD & PROFIT ( 10% x D ) 38,115.98
F HARGA SATUAN PEKERJAAN ( D + E ) 419,275.78

A.4.1.1.23 Pemasangan 1 M2 Bekisitng untuk Dinding Sheerwall (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
A
Kepala Tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 123,439.80
BAHAN
Kayu Kelas III M3 0.0300 1,785,000.00 53,550.00
Paku 5 - 12 Cm Kg 0.4000 42,000.00 16,800.00
Minyak Bekisting Liter 0.2000 31,500.00 6,300.00
B Balok Kayu Kelas II M3 0.0200 2,310,000.00 46,200.00
Plywood Tebal 9 mm Lbr 0.3500 110,200.00 38,570.00
Dolken Kayu φ 8 - 10/400 Cm Batang 3.0000 15,000.00 45,000.00
Penjaga Jarak Bekisting / Spacer Buah 4.0000 5,700.00 22,800.00
JUMLAH HARGA BAHAN 229,220.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 352,659.80
E OVERHEAD & PROFIT ( 10% x D ) 35,265.98
F HARGA SATUAN PEKERJAAN ( D + E ) 387,925.78

A.4.1.1.25 Pemasangan 1 M2 Bekisitng untuk Tangga Beton Bangunan Gedung (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6600 100,000.00 66,000.00

A
Tukang Kayu L.02 OH 0.3300 145,000.00 47,850.00
A
Kepala Tukang L.03 OH 0.0330 170,000.00 5,610.00
Mandor L.04 OH 0.0330 120,600.00 3,979.80
JUMLAH TENAGA KERJA 123,439.80
BAHAN
Kayu Kelas III M3 0.0300 1,785,000.00 53,550.00
Paku 5 - 12 Cm Kg 0.4000 42,000.00 16,800.00
Minyak Bekisting Ltr 0.1500 31,500.00 4,725.00
B
Balok Kayu Kelas II M3 0.0150 2,310,000.00 34,650.00
Plywood Tebal 9 mm Lbr 0.3500 110,200.00 38,570.00
Dolken Kayu φ 8 - 10/400 Cm Btg 2.0000 15,000.00 30,000.00
JUMLAH HARGA BAHAN 178,295.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 301,734.80
E OVERHEAD & PROFIT ( 10% x D ) 30,173.48
F HARGA SATUAN PEKERJAAN ( D + E ) 331,908.28

A.4.1.1.13 Pemasangan 1 M2 Bekisitng untuk Jembatan untuk Pengecoran Beton (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Batu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 24,064.80
BAHAN
Kayu Kelas III M3 0.0264 1,785,000.00 47,124.00
B Paku 5 - 12 Cm Kg 0.6000 42,000.00 25,200.00
Dolken Kayu φ 8 - 10/400 Cm Btg 0.5000 15,000.00 7,500.00
JUMLAH HARGA BAHAN 79,824.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 103,888.80
E OVERHEAD & PROFIT ( 10% x D ) 10,388.88
F HARGA SATUAN PEKERJAAN ( D + E ) 114,277.68

A.4.1.1.11 Membuat 1 M3 Beton Mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.1000 100,000.00 210,000.00
Tukang Batu L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.1050 120,600.00 12,663.00
JUMLAH TENAGA KERJA 279,363.00
BAHAN
Semen Portland Kg 439.0000 1,890.00 829,710.00
Pasir Pasang Kg 670.0000 199.50 133,665.00
B
Kerikil (Maks 30 mm) Kg 1,006.0000 217.78 219,084.44
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,184,609.44
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,463,972.44
E OVERHEAD & PROFIT ( 10% x D ) 146,397.24
F HARGA SATUAN PEKERJAAN ( D + E ) 1,610,369.69

A.4.1.1.12 Membuat 1 M3 Beton Mutu f'c = 31,2 Mpa (K 350), slump (12 ± 2) cm, w/c = 0,48 (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.1000 100,000.00 210,000.00
Tukang Batu L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.1050 120,600.00 12,663.00
JUMLAH TENAGA KERJA 279,363.00
BAHAN
Semen Portland Kg 448.0000 1,890.00 846,720.00
Pasir Pasang Kg 667.0000 199.50 133,066.50
B
Kerikil (Maks 30 mm) Kg 1,000.0000 217.78 217,777.78
Air Liter 215.0000 10.00 2,150.00
JUMLAH HARGA BAHAN 1,199,714.28
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,479,077.28
E OVERHEAD & PROFIT ( 10% x D ) 147,907.73
F HARGA SATUAN PEKERJAAN ( D + E ) 1,626,985.01

A.4.1.1.14 Pemasangan 1 M1 PVC Waterstop Lebar 150 mm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Batu / Pipa L.02 OH 0.0300 145,000.00 4,350.00
A
Kepala Tukang L.03 OH 0.0030 170,000.00 510.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 11,221.80
BAHAN
B Waterstop Lebar 150 mm M 1.0500 76,600.00 80,430.00
JUMLAH HARGA BAHAN 80,430.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 91,651.80
E OVERHEAD & PROFIT ( 10% x D ) 9,165.18
F HARGA SATUAN PEKERJAAN ( D + E ) 100,816.98

A.4.1.1.15 Pemasangan 1 M1 PVC Waterstop Lebar 200 mm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Batu / Pipa L.02 OH 0.0350 145,000.00 5,075.00
A
Kepala Tukang L.03 OH 0.0040 170,000.00 680.00
Mandor L.04 OH 0.0070 120,600.00 844.20
JUMLAH TENAGA KERJA 13,599.20
BAHAN
B Waterstop Lebar 200 mm M 1.0500 97,600.00 102,480.00
JUMLAH HARGA BAHAN 102,480.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 116,079.20
E OVERHEAD & PROFIT ( 10% x D ) 11,607.92
F HARGA SATUAN PEKERJAAN ( D + E ) 127,687.12

A.4.1.1.16 Pemasangan 1 M1 PVC Waterstop Lebar 230 mm - 320 mm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0800 100,000.00 8,000.00
Tukang Batu / Pipa L.02 OH 0.0400 145,000.00 5,800.00
A
Kepala Tukang L.03 OH 0.0040 170,000.00 680.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 14,962.40
BAHAN
B Waterstop Lebar 230 mm - 320 mm M 1.0500 114,400.00 120,120.00
JUMLAH HARGA BAHAN 120,120.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 135,082.40
E OVERHEAD & PROFIT ( 10% x D ) 13,508.24
F HARGA SATUAN PEKERJAAN ( D + E ) 148,590.64

A.4.1.1.17a Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 6) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40
BAHAN
Besi Beton (Polos / Ulir) Ø6" Kg 10.5000 16,009.76 168,102.48
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 171,567.48

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 190,389.88
E OVERHEAD & PROFIT ( 10% x D ) 19,038.99
F HARGA SATUAN PEKERJAAN ( D + E ) 209,428.87
G 1 KG BESI 20,942.89

A.4.1.1.17b Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 8) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40
BAHAN

B
Besi Beton (Polos / Ulir) Ø8" Kg 10.5000 14,673.00 154,066.46
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 157,531.46
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 176,353.86
E OVERHEAD & PROFIT ( 10% x D ) 17,635.39
F HARGA SATUAN PEKERJAAN ( D + E ) 193,989.24
G 1 KG BESI 19,398.92

A.4.1.1.17c Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 10) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40
BAHAN
Besi Beton (Polos / Ulir) Ø10" Kg 10.5000 14,181.52 148,906.00
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 152,371.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 171,193.40
E OVERHEAD & PROFIT ( 10% x D ) 17,119.34
F HARGA SATUAN PEKERJAAN ( D + E ) 188,312.74
G 1 KG BESI 18,831.27

A.4.1.1.17d Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 12) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40

BAHAN
Besi Beton (Polos / Ulir) Ø12" Kg 10.5000 13,607.36 142,877.25
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 146,342.25
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 165,164.65
E OVERHEAD & PROFIT ( 10% x D ) 16,516.47
F HARGA SATUAN PEKERJAAN ( D + E ) 181,681.12
G 1 KG BESI 18,168.11

A.4.1.1.17e Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 14) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40
BAHAN
Besi Beton (Polos / Ulir) Ø14" Kg 10.5000 13,498.62 141,735.54
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 145,200.54
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 164,022.94
E OVERHEAD & PROFIT ( 10% x D ) 16,402.29
F HARGA SATUAN PEKERJAAN ( D + E ) 180,425.23
G 1 KG BESI 18,042.52

A.4.1.1.17f Pembesian 10 Kg dengan Besi Polos atau Besi Ulir (Besi 16) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Besi L.02 OH 0.0700 145,000.00 10,150.00
A
Kepala Tukang L.03 OH 0.0070 170,000.00 1,190.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 18,822.40
BAHAN
Besi Beton (Polos / Ulir) Ø16" Kg 10.5000 14,205.75 149,160.33
B
Kawat Beton Kg 0.1500 23,100.00 3,465.00
JUMLAH HARGA BAHAN 152,625.33
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 171,447.73
E OVERHEAD & PROFIT ( 10% x D ) 17,144.77
F HARGA SATUAN PEKERJAAN ( D + E ) 188,592.50
G 1 KG BESI 18,859.25

A.4.1.1.18 Pemasangan 10 Kg Kabel Prategang (Presstressed) Polos / Strands (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Besi L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 13,461.80
BAHAN
Besi Beton (Polos / Ulir) Kg 10.5000 18,600.00 195,300.00
B
Kawat Beton Kg 0.1000 23,100.00 2,310.00
JUMLAH HARGA BAHAN 197,610.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 211,071.80
E OVERHEAD & PROFIT ( 10% x D ) 21,107.18
F HARGA SATUAN PEKERJAAN ( D + E ) 232,178.98
G 1 KG KABEL 23,217.90

A.4.1.1.28 Membuat 1 M3 Pondasi Beton Bertulang (150 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 5.3000 100,000.00 530,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.3000 145,000.00 188,500.00
A
Tukang Besi L.02 OH 1.0500 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.2620 170,000.00 44,540.00
Mandor L.04 OH 0.2650 120,600.00 31,959.00
JUMLAH TENAGA KERJA 987,124.00
BAHAN
Kayu Kelas III M3 0.2000 1,785,000.00 357,000.00
Paku 5 - 12 Cm Kg 1.5000 42,000.00 63,000.00
Minyak Bekisting Liter 0.4000 31,500.00 12,600.00
Besi Beton Polos Kg 157.5000 18,600.00 2,929,500.00
B
Kawat Beton Kg 2.2500 23,100.00 51,975.00
Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
JUMLAH HARGA BAHAN 4,438,077.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 5,425,201.00
E OVERHEAD & PROFIT ( 10% x D ) 542,520.10
F HARGA SATUAN PEKERJAAN ( D + E ) 5,967,721.10

A.4.1.1.29 Membuat 1 M3 Sloof Beton Bertulang (200 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 5.6500 100,000.00 565,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.5600 145,000.00 226,200.00
A
Tukang Besi L.02 OH 1.4000 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.3230 170,000.00 54,910.00
Mandor L.04 OH 0.2830 120,600.00 34,129.80
JUMLAH TENAGA KERJA 1,123,114.80
BAHAN
Kayu Kelas III M3 0.2700 1,785,000.00 481,950.00
Paku 5 - 12 Cm Kg 2.0000 42,000.00 84,000.00
Minyak Bekisting Liter 0.6000 31,500.00 18,900.00
Besi Beton Polos Kg 210.0000 18,600.00 3,906,000.00
B
Kawat Beton Kg 3.0000 23,100.00 69,300.00
Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
JUMLAH HARGA BAHAN 5,584,152.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 6,707,266.80
E OVERHEAD & PROFIT ( 10% x D ) 670,726.68
F HARGA SATUAN PEKERJAAN ( D + E ) 7,377,993.48

A.4.1.1.30 Membuat 1 M3 Kolom Beton Bertulang (300 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 7.0500 100,000.00 705,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.6500 145,000.00 239,250.00
A
Tukang Besi L.02 OH 2.1000 145,000.00 304,500.00
Kepala Tukang L.03 OH 0.4030 170,000.00 68,510.00
Mandor L.04 OH 0.3530 120,600.00 42,571.80
JUMLAH TENAGA KERJA 1,399,706.80
BAHAN
Kayu Kelas III M3 0.4000 1,785,000.00 714,000.00
Paku 5 - 12 Cm Kg 4.0000 42,000.00 168,000.00
Minyak Bekisting Liter 2.0000 31,500.00 63,000.00
Besi Beton Polos Kg 315.0000 18,600.00 5,859,000.00
Kawat Beton Kg 4.5000 23,100.00 103,950.00
B Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
Kayu Kelas II Balok M3 0.1500 2,310,000.00 346,500.00
Plywood Tebal 9 mm Lbr 3.5000 110,200.00 385,700.00
Dolken Kayu φ 8 - 10/400 Cm Batang 20.0000 15,000.00 300,000.00
JUMLAH HARGA BAHAN 8,964,152.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 10,363,858.80
E OVERHEAD & PROFIT ( 10% x D ) 1,036,385.88
F HARGA SATUAN PEKERJAAN ( D + E ) 11,400,244.68

A.4.1.1.31 Membuat 1 M3 Balok Beton Bertulang (200 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 6.3500 100,000.00 635,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.6500 145,000.00 239,250.00
A
Tukang Besi L.02 OH 1.4000 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.3330 170,000.00 56,610.00
Mandor L.04 OH 0.3180 120,600.00 38,350.80
JUMLAH TENAGA KERJA 1,212,085.80
BAHAN
Kayu Kelas III M3 0.3200 1,785,000.00 571,200.00
Paku 5 - 12 Cm Kg 3.2000 42,000.00 134,400.00
Minyak Bekisting Liter 1.6000 31,500.00 50,400.00
Besi Beton Polos Kg 210.0000 18,600.00 3,906,000.00
Kawat Beton Kg 3.0000 23,100.00 69,300.00
B Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
Kayu Kelas II Balok M3 0.1400 2,310,000.00 323,400.00
Plywood Tebal 9 mm Lbr 2.8000 110,200.00 308,560.00
Dolken Kayu φ 8 - 10/400 Cm Batang 16.0000 15,000.00 240,000.00
JUMLAH HARGA BAHAN 6,627,262.00
PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 7,839,347.80
E OVERHEAD & PROFIT ( 10% x D ) 783,934.78
F HARGA SATUAN PEKERJAAN ( D + E ) 8,623,282.58

A.4.1.1.32 Membuat 1 M3 Kolom Beton Bertulang (150 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 5.3000 100,000.00 530,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.3000 145,000.00 188,500.00
A
Tukang Besi L.02 OH 1.0500 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.2650 170,000.00 45,050.00
Mandor L.04 OH 0.2650 120,600.00 31,959.00
JUMLAH TENAGA KERJA 987,634.00
BAHAN
Kayu Kelas III M3 0.3200 1,785,000.00 571,200.00
Paku 5 - 12 Cm Kg 3.2000 42,000.00 134,400.00
Minyak Bekisting Liter 1.6000 31,500.00 50,400.00
Besi Beton Polos Kg 157.5000 18,600.00 2,929,500.00
Kawat Beton Kg 2.2500 23,100.00 51,975.00
B Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
Kayu Kelas II Balok M3 0.1200 2,310,000.00 277,200.00
Plywood Tebal 9 mm Lbr 2.8000 110,200.00 308,560.00
Dolken Kayu φ 8 - 10/400 Cm Batang 32.0000 15,000.00 480,000.00
JUMLAH HARGA BAHAN 5,827,237.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 6,814,871.00
E OVERHEAD & PROFIT ( 10% x D ) 681,487.10
F HARGA SATUAN PEKERJAAN ( D + E ) 7,496,358.10

A.4.1.1.33 Membuat 1 M3 Dinding Beton Bertulang (150 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 5.3000 100,000.00 530,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.3000 145,000.00 188,500.00
A
Tukang Besi L.02 OH 1.0500 145,000.00 152,250.00
Kepala Tukang L.03 OH 0.2620 170,000.00 44,540.00
Mandor L.04 OH 0.2650 120,600.00 31,959.00
JUMLAH TENAGA KERJA 987,124.00
BAHAN
Kayu Kelas III M3 0.2400 1,785,000.00 428,400.00
Paku 5 - 12 Cm Kg 3.2000 42,000.00 134,400.00
Minyak Bekisting Liter 1.6000 31,500.00 50,400.00
Besi Beton Polos Kg 157.5000 18,600.00 2,929,500.00
Kawat Beton Kg 2.2500 23,100.00 51,975.00
B Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
Kayu Kelas II Balok M3 0.1600 2,310,000.00 369,600.00
Plywood Tebal 9 mm Lbr 2.8000 110,200.00 308,560.00
Dolken Kayu φ 8 - 10/400 Cm Batang 24.0000 15,000.00 360,000.00
JUMLAH HARGA BAHAN 5,656,837.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 6,643,961.00
E OVERHEAD & PROFIT ( 10% x D ) 664,396.10
F HARGA SATUAN PEKERJAAN ( D + E ) 7,308,357.10

A.4.1.1.34 Membuat 1 M3 Dinding Beton Bertulang (200 Kg Besi + Bekisting) (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 5.6500 100,000.00 565,000.00
Tukang Batu L.02 OH 0.2750 145,000.00 39,875.00
Tukang Kayu L.02 OH 1.5600 145,000.00 226,200.00
A
Tukang Besi L.02 OH 1.4000 145,000.00 203,000.00
Kepala Tukang L.03 OH 0.3230 170,000.00 54,910.00
Mandor L.04 OH 0.2830 120,600.00 34,129.80
JUMLAH TENAGA KERJA 1,123,114.80

BAHAN
Kayu Kelas III M3 0.2500 1,785,000.00 446,250.00
Paku 5 - 12 Cm Kg 3.0000 42,000.00 126,000.00
Minyak Bekisting Liter 1.2000 31,500.00 37,800.00
Besi Beton Polos Kg 210.0000 18,600.00 3,906,000.00
Kawat Beton Kg 3.0000 23,100.00 69,300.00
B Semen Portland Kg 336.0000 1,890.00 635,040.00
Pasir Beton M3 0.5400 279,300.00 150,822.00
Kerikil M3 0.8100 294,000.00 238,140.00
Kayu Kelas II Balok M3 0.1050 2,310,000.00 242,550.00
Plywood Tebal 9 mm Lbr 2.5000 110,200.00 275,500.00
Dolken Kayu φ 8 - 10/400 Cm Batang 14.0000 15,000.00 210,000.00
JUMLAH HARGA BAHAN 6,337,402.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 7,460,516.80
E OVERHEAD & PROFIT ( 10% x D ) 746,051.68
F HARGA SATUAN PEKERJAAN ( D + E ) 8,206,568.48

A.4.1.1.35 Membuat 1 M1 Kolom Praktis Beton Bertulang (11 x 11) Cm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1800 100,000.00 18,000.00
Tukang Batu L.02 OH 0.0200 145,000.00 2,900.00
Tukang Kayu L.02 OH 0.0200 145,000.00 2,900.00
A
Tukang Besi L.02 OH 0.0200 145,000.00 2,900.00
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0090 120,600.00 1,085.40
JUMLAH TENAGA KERJA 28,805.40
BAHAN
Kayu Kelas III M3 0.0020 1,785,000.00 3,570.00
Paku 5 - 12 Cm Kg 0.0100 42,000.00 420.00
Minyak Bekisting Liter 31,500.00 -
Besi Beton Polos Kg 3.0000 18,600.00 55,800.00
B
Kawat Beton Kg 0.4500 23,100.00 10,395.00
Semen Portland Kg 4.0000 1,890.00 7,560.00
Pasir Beton M3 0.0060 279,300.00 1,675.80
Kerikil M3 0.0090 294,000.00 2,646.00
JUMLAH HARGA BAHAN 82,066.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 110,872.20
E OVERHEAD & PROFIT ( 10% x D ) 11,087.22
F HARGA SATUAN PEKERJAAN ( D + E ) 121,959.42

A.4.1.1.36 Membuat 1 M1 Ring Balok Beton Bertulang (10 x 15) Cm (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2970 100,000.00 29,700.00
Tukang Batu L.02 OH 0.0330 145,000.00 4,785.00
Tukang Kayu L.02 OH 0.0330 145,000.00 4,785.00
A
Tukang Besi L.02 OH 0.0330 145,000.00 4,785.00
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 47,564.00

BAHAN
Kayu Kelas III M3 0.0030 1,785,000.00 5,355.00
Paku 5 - 12 Cm Kg 0.0200 42,000.00 840.00
Minyak Bekisting Liter 31,500.00 -
Besi Beton Polos Kg 3.6000 18,600.00 66,960.00
B
Kawat Beton Kg 0.0500 23,100.00 1,155.00
Semen Portland Kg 5.5000 1,890.00 10,395.00
Pasir Beton M3 0.0090 279,300.00 2,513.70
Kerikil M3 0.0150 294,000.00 4,410.00
JUMLAH HARGA BAHAN 91,628.70
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 139,192.70
E OVERHEAD & PROFIT ( 10% x D ) 13,919.27
F HARGA SATUAN PEKERJAAN ( D + E ) 153,111.97
NO. 28/PRT/M/2016

Klik to
Uraian EE
1.00
2.08
2.93
1.00
1.88
2.82

1.00
1.80
2.71
1.00
1.68
2.53

1.00
1.65
2.47

1.00
0.00
0.00
1.00
0.00
1.00
10.00
5.00
1.00
10.00
5.00
0.38
1.00
22.73
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM


A.4.2.1.1 Pemasangan 1 Kg Baja Profil (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Las Konstruksi L.02 OH 0.0600 145,000.00 8,700.00
A Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 120,600.00 361.80
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
JUMLAH TENAGA KERJA 22,081.80
BAHAN
Baja Profil Kg 1.1500 18,500.00 21,275.00
B
Kawat Las -
JUMLAH HARGA BAHAN 21,275.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 43,356.80
E OVERHEAD & PROFIT ( 10% x D ) 4,335.68
F HARGA SATUAN PEKERJAAN ( D + E ) 47,692.48

A.4.2.1.7 Pemasangan 1 M2 Pintu Rolling Door Besi (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang Las Biasa L.02 OH 1.2000 145,000.00 174,000.00
A
Kepala Tukang L.03 OH 0.1200 170,000.00 20,400.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 315,123.60
BAHAN
B Pintu Gulung Besi M2 1.0000 -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 315,123.60
E OVERHEAD & PROFIT ( 10% x D ) 31,512.36
F HARGA SATUAN PEKERJAAN ( D + E ) 346,635.96
A.4.2.1.9 Pemasangan 1 M2 Pintu Rolling Door Aluminium (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Aluminium L.02 OH 1.0000 145,000.00 145,000.00
A
Kepala Tukang L.03 OH 0.1000 170,000.00 17,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 268,030.00
BAHAN
B Rooling Door Aluminium M2 1.0000 -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 268,030.00
E OVERHEAD & PROFIT ( 10% x D ) 26,803.00
F HARGA SATUAN PEKERJAAN ( D + E ) 294,833.00

A.4.2.1.8 Pemasangan 1 M2 Pintu Lipat (Folding Door) Bahan Plastik / PVC (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.4400 100,000.00 44,000.00
Tukang Las Biasa L.02 OH 0.4400 145,000.00 63,800.00
A
Kepala Tukang L.03 OH 0.0440 170,000.00 7,480.00
Mandor L.04 OH 0.0220 120,600.00 2,653.20
JUMLAH TENAGA KERJA 117,933.20
BAHAN
B Pintu Lipat M2 1.0000 -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 117,933.20
E OVERHEAD & PROFIT ( 10% x D ) 11,793.32
F HARGA SATUAN PEKERJAAN ( D + E ) 129,726.52

A.4.2.1.9 Pemasangan 1 M2 Sunscreen Alluminium (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0800 100,000.00 8,000.00
Tukang L.02 OH 0.8000 145,000.00 116,000.00
A
Kepala Tukang L.03 OH 0.0800 170,000.00 13,600.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 138,082.40
BAHAN
B Sunscreen Aluminium M2 1.0000 -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 138,082.40
E OVERHEAD & PROFIT ( 10% x D ) 13,808.24
F HARGA SATUAN PEKERJAAN ( D + E ) 151,890.64

A.4.2.1.15 Pemasangan 1 M2 Terali Besi Strip (20 x 3) mm (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.6700 100,000.00 167,000.00
Tukang Las L.02 OH 1.6700 145,000.00 242,150.00
A
Kepala Tukang L.03 OH 0.1670 170,000.00 28,390.00
Mandor L.04 OH 0.0830 120,600.00 10,009.80
JUMLAH TENAGA KERJA 447,549.80
BAHAN
Besi Strip Kg 6.1770 18,600.00 114,892.20
B
Pengelasan Cm 27.0800 10,229.91 277,026.02
JUMLAH HARGA BAHAN 391,918.22
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 839,468.02
E OVERHEAD & PROFIT ( 10% x D ) 83,946.80
F HARGA SATUAN PEKERJAAN ( D + E ) 923,414.82

A.4.2.1.13 Pemasangan 1 M2 Kawat Nyamuk (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 26,803.00
BAHAN
Kawat Nyamuk M2 1.1000 -
B Pengelasan Cm 11.1100 10,229.91 113,654.32
Baja Strip (0.2 x 2) Cm Kg 1.7160 18,600.00 31,917.60
JUMLAH HARGA BAHAN 145,571.92
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 172,374.92
E OVERHEAD & PROFIT ( 10% x D ) 17,237.49
F HARGA SATUAN PEKERJAAN ( D + E ) 189,612.41

A.4.2.1.17 Pemasangan 1 M2 Jendela Nako dan Tralis (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0010 120,600.00 120.60
JUMLAH TENAGA KERJA 52,520.60
BAHAN
Jendela Nako (Rangka + Kaca 5 mm) M2 1.1000 211,000.00 232,100.00
B Paku Skrup 1 Cm - 2,5 Cm) Buah 10.0000 1,500.00 15,000.00
Besi Strip M 7.0000 18,600.00 130,200.00
JUMLAH HARGA BAHAN 377,300.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 429,820.60
E OVERHEAD & PROFIT ( 10% x D ) 42,982.06
F HARGA SATUAN PEKERJAAN ( D + E ) 472,802.66

A.4.2.1.18 Pemasangan 1 M1 Talang Datar / Jurai Seng BJLS 28 Lebar 90 Cm (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0010 120,600.00 120.60
JUMLAH TENAGA KERJA 52,520.60
BAHAN
Seng Plat M 1.0500 49,300.00 51,765.00
B Paku 1 Cm - 2,5 Cm Kg 0.0150 42,000.00 630.00
Papan Kayu Kelas II atau Kelas III M3 0.0190 2,310,000.00 43,890.00
JUMLAH HARGA BAHAN 96,285.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 148,805.60
E OVERHEAD & PROFIT ( 10% x D ) 14,880.56
F HARGA SATUAN PEKERJAAN ( D + E ) 163,686.16

A.4.2.1.19 Pemasangan 1 M1 Talang 1/2 Lingkaran D-15 Cm, Seng Plat BJLS 30 Lebar 45 Cm (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang L.02 OH 0.3000 145,000.00 43,500.00
A
Kepala Tukang L.03 OH 0.0300 170,000.00 5,100.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 64,564.80
BAHAN
Seng Plat M 1.0500 49,300.00 51,765.00
B Paku 1 Cm - 2,5 Cm Kg 0.0100 42,000.00 420.00
Besi Strip Kg 0.5000 18,600.00 9,300.00
JUMLAH HARGA BAHAN 61,485.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 126,049.80
E OVERHEAD & PROFIT ( 10% x D ) 12,604.98
F HARGA SATUAN PEKERJAAN ( D + E ) 138,654.78

A.4.2.1.20 Pemasangan 1 M2 Rangka Besi Hollow 40.40.1.7 mm, Modul 60 x 120, untuk Partisi (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang L.02 OH 0.2500 145,000.00 36,250.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 67,067.80

BAHAN
Rangka Metal Hollow 40.40.1,7 mm M1 3.5000 28,866.67 101,033.33
B
Assesories (Perkuatan, Las, dll) Ls 100%xrangka 28,866.67 28,866.67
JUMLAH HARGA BAHAN 129,900.00
PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 196,967.80
E OVERHEAD & PROFIT ( 10% x D ) 19,696.78
F HARGA SATUAN PEKERJAAN ( D + E ) 216,664.58

A.4.2.1.21 Pemasangan 1 M2 Rangka Besi Hollow 40.40.0,45 mm, Modul 60 x 60, Plafond (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 93,870.80
BAHAN
Rangka Metal Hollow 40.40.0,45 mm M1 4.0000 22,750.00 91,000.00
B
Assesories (Perkuatan, Las, dll) Ls 100%xrangka 22,750.00 22,750.00
JUMLAH HARGA BAHAN 113,750.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 207,620.80
E OVERHEAD & PROFIT ( 10% x D ) 20,762.08
F HARGA SATUAN PEKERJAAN ( D + E ) 228,382.88

A.4.2.1.22 Pemasangan 1 M2 Atap Pelana Rangka Atap Baja Ringan (Canai Dingin) Profil C75 (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7340 100,000.00 73,400.00
Tukang L.02 OH 0.7340 145,000.00 106,430.00
A
Kepala Tukang L.03 OH 0.0730 170,000.00 12,410.00
Mandor L.04 OH 0.0370 120,600.00 4,462.20
JUMLAH TENAGA KERJA 196,702.20
BAHAN
B Baja Ringan Canai Dingin C75 Btg 0.8730 -
JUMLAH HARGA BAHAN -
PERALATAN
C Aksesoris % 10% - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 196,702.20
E OVERHEAD & PROFIT ( 10% x D ) 19,670.22
F HARGA SATUAN PEKERJAAN ( D + E ) 216,372.42

A.4.2.1.23 Pemasangan 1 M2 Atap Jurai/Limasan Rangka Atap Baja Ringan (Canai Dingin) Profil C75 (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7604 100,000.00 76,040.00
Tukang L.02 OH 0.7604 145,000.00 110,258.00
A
Kepala Tukang L.03 OH 0.0760 170,000.00 12,920.00
Mandor L.04 OH 0.0380 120,600.00 4,582.80
JUMLAH TENAGA KERJA 203,800.80
BAHAN
B Baja Ringan Canai Dingin C75 Btg 0.8730 -
JUMLAH HARGA BAHAN -
PERALATAN
C Aksesoris % 10% - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 203,800.80
E OVERHEAD & PROFIT ( 10% x D ) 20,380.08
F HARGA SATUAN PEKERJAAN ( D + E ) 224,180.88

A.4.2.1.24 Pemasangan 1 M1 Kusen Aluminium (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0430 100,000.00 4,300.00
Tukang Khusus Aluminium L.02 OH 0.0430 145,000.00 6,235.00
A
Kepala Tukang L.03 OH 0.0043 170,000.00 731.00
Mandor L.04 OH 0.0021 120,600.00 253.26
JUMLAH TENAGA KERJA 11,519.26
BAHAN
Profil Aluminium 4" Alexindo M 1.1000 120,700.00 132,770.00
B Skrup Fixer Buah 2.0000 4,700.00 9,400.00
Sealant Tube 0.0600 26,200.00 1,572.00
JUMLAH HARGA BAHAN 143,742.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 155,261.26
E OVERHEAD & PROFIT ( 10% x D ) 15,526.13
F HARGA SATUAN PEKERJAAN ( D + E ) 170,787.39

A.4.2.1.25 Pemasangan 1 M2 Pintu Aluminium Strip Lebar 8 Cm (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0850 100,000.00 8,500.00
Tukang Khusus Aluminium L.02 OH 0.0850 145,000.00 12,325.00
A
Kepala Tukang L.03 OH 0.0085 170,000.00 1,445.00
Mandor L.04 OH 0.0042 120,600.00 506.52
JUMLAH TENAGA KERJA 22,776.52
BAHAN
Profil Aluminium M 4.4000 120,700.00 531,080.00
B
Aluminium Strip M 14.6000 12,200.00 178,120.00
JUMLAH HARGA BAHAN 709,200.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 731,976.52
E OVERHEAD & PROFIT ( 10% x D ) 73,197.65
F HARGA SATUAN PEKERJAAN ( D + E ) 805,174.17

A.4.2.1.26 Pemasangan 1 M2 Pintu Kaca Rangka Aluminium (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0850 100,000.00 8,500.00
Tukang Aluminium / Kaca L.02 OH 0.0850 145,000.00 12,325.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 22,958.00
BAHAN
Profil Aluminium setara Alexindo M 4.4000 120,700.00 531,080.00
B Profil Kaca M 4.5000 17,800.00 80,100.00
Sealant Tube 0.2700 26,200.00 7,074.00
JUMLAH HARGA BAHAN 618,254.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 641,212.00
E OVERHEAD & PROFIT ( 10% x D ) 64,121.20
F HARGA SATUAN PEKERJAAN ( D + E ) 705,333.20

A.4.2.1.27 Pemasangan 1 M2 Venetions Blinds dan Vertical Blinds (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 93,870.80
BAHAN
B Venetions Blinds dan Vertical Blinds (Tirai) M2 1.0000 -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 93,870.80
E OVERHEAD & PROFIT ( 10% x D ) 9,387.08
F HARGA SATUAN PEKERJAAN ( D + E ) 103,257.88

A.4.2.1.3 Pemasangan 1 Kg Besi Profil (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Las Konstruksi L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 16,081.80

BAHAN
Besi Profil Kg 1.1500 18,500.00 21,275.00
B
Cat Besi Kg 0.0800 59,800.00 4,784.00
JUMLAH HARGA BAHAN 26,059.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 42,140.80
E OVERHEAD & PROFIT ( 10% x D ) 4,214.08
F HARGA SATUAN PEKERJAAN ( D + E ) 46,354.88

A.4.2.1.4 Pengerjaan 100 Kg Pekerjaan Perakitan (Permen PUPR No. 28 Thn 2016)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Besi Konstruksi L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0010 170,000.00 170.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 25,273.00
BAHAN
Solar Liter 1.0000 12,000.00 12,000.00
B
Minyak Pelumas Liter 0.1000 26,200.00 2,620.00
JUMLAH HARGA BAHAN 14,620.00
PERALATAN
C Sewa Alat Jam 0.80000 50,000.00 40,000.00
JUMLAH HARGA ALAT 40,000.00
D JUMLAH ( A + B + C ) 79,893.00
E OVERHEAD & PROFIT ( 10% x D ) 7,989.30
F HARGA SATUAN PEKERJAAN ( D + E ) 87,882.30
G 1 KG PERAKITAN 878.82

A.4.2.1.4 Pembuatan 1 M2 Pintu Besi Plat Baja Tebal 2 mm Rangkap, Rangka Baja Siku (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0500 100,000.00 105,000.00
Tukang Las Biasa L.02 OH 1.0500 145,000.00 152,250.00
A
Kepala Tukang L.03 OH 0.1050 170,000.00 17,850.00
Mandor L.04 OH 0.0520 120,600.00 6,271.20
JUMLAH TENAGA KERJA 281,371.20
BAHAN
Besi Siku L 30.30.3 Kg 15.0000 18,500.00 277,500.00
B Besi Plat Baja Kg 32.8000 -
Kawat Las Kg 0.0500 -
JUMLAH HARGA BAHAN 277,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 558,871.20
E OVERHEAD & PROFIT ( 10% x D ) 55,887.12
F HARGA SATUAN PEKERJAAN ( D + E ) 614,758.32

A.4.2.1.5 Pengerjaan 10 Cm Pengelasan dengan Las Listrik (Permen PUPR No. 28 Thn 2016)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
Tukang Besi Konstruksi L.02 OH 0.0200 145,000.00 2,900.00
A
Kepala Tukang L.03 OH 0.0020 170,000.00 340.00
Mandor L.04 OH 0.0020 120,600.00 241.20
JUMLAH TENAGA KERJA 7,481.20
BAHAN
Kawat Las Listrik Kg 0.4000 170,300.00 68,120.00
B Solar Liter 0.3000 12,000.00 3,600.00
Minyak Pelumas Liter 0.0400 26,200.00 1,048.00
JUMLAH HARGA BAHAN 72,768.00
PERALATAN
C Sewa Alat Jam 0.17000 75,000.00 12,750.00
JUMLAH HARGA ALAT 12,750.00
D JUMLAH ( A + B + C ) 92,999.20
E OVERHEAD & PROFIT ( 10% x D ) 9,299.92
F HARGA SATUAN PEKERJAAN ( D + E ) 102,299.12
G 1 CM PENGELASAN 10,229.91

A.4.2.1.19 Pemasangan 1 M2 Aluminium Composite Panel PVDF 0.3 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3900 100,000.00 39,000.00
Tukang L.02 OH 0.7000 145,000.00 101,500.00
A
Kepala Tukang L.03 OH 0.0700 170,000.00 11,900.00
Mandor L.04 OH 0.0070 120,600.00 844.20
JUMLAH TENAGA KERJA 153,244.20
BAHAN
ACP Panel 0.3 mm Glossy Lbr 0.3360 892,500.00 299,880.00
Braket Siku 40 x 40 x 4 mm Btg 0.2670 120,100.00 32,066.70
Rangka Hollow Galvanis 40 x 40 x 1,1 mm Btg 0.8000 136,500.00 109,200.00
Bracket ACP M1 1.0500 36,900.00 38,745.00
B
Sealant Tube 0.2500 26,200.00 6,550.00
Paku Skrup Beton Kg 0.0800 26,200.00 2,096.00
Paku Skrup Kg 0.1100 26,200.00 2,882.00
Accessories (Perkuatan, Las, dll) Ls 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 506,419.70
PERALATAN
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 659,663.90
E OVERHEAD & PROFIT ( 10% x D ) 65,966.39
F HARGA SATUAN PEKERJAAN ( D + E ) 725,630.29

A.4.2.1.20 Pemasangan 1 M2 Rangka Atap Baja Ringan Taso


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1800 100,000.00 18,000.00
Tukang L.02 OH 0.2400 145,000.00 34,800.00
A
Kepala Tukang L.03 OH 0.0180 170,000.00 3,060.00
Mandor L.04 OH 0.0240 120,600.00 2,894.40
JUMLAH TENAGA KERJA 58,754.40

BAHAN
Chord - Kanal C 75 x 100 mm Btg 0.3670 142,800.00 52,407.60
Reng - Kanal U Btg 0.7330 57,700.00 42,294.10
B L Braket Bh 0.0250 4,200.00 105.00
Screw 12 - 14 Bh 2.0000 400.00 800.00
Screw 10 - 16 Bh 8.0000 300.00 2,400.00
JUMLAH HARGA BAHAN 98,006.70
PERALATAN
C - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 156,761.10
E OVERHEAD & PROFIT ( 10% x D ) 15,676.11
F HARGA SATUAN PEKERJAAN ( D + E ) 172,437.21
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


A.4.4.1.1 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1 Batu dengan Mortar Tipe M,fc' 17,2 Mpa (Setara
Campuran 1 SP : 2 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0300 120,600.00 3,618.00
JUMLAH TENAGA KERJA 96,018.00
BAHAN
Bata Merah Buah 140.0000 1,000.00 140,000.00
B Semen Portland Kg 43.5000 1,890.00 82,215.00
Pasir Pasang M3 0.0800 279,300.00 22,344.00
JUMLAH HARGA BAHAN 244,559.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 340,577.00
E OVERHEAD & PROFIT ( 10% x D ) 34,057.70
F HARGA SATUAN PEKERJAAN ( D + E ) 374,634.70

A.4.4.1.2 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1 Batu dengan Mortar Tipe S,fc' 12,5 Mpa (Setara
Campuran 1 SP : 3 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0300 120,600.00 3,618.00
JUMLAH TENAGA KERJA 96,018.00
BAHAN
Bata Merah Buah 140.0000 1,000.00 140,000.00
B Semen Portland Kg 32.9500 1,890.00 62,275.50
Pasir Pasang M3 0.0910 279,300.00 25,416.30
JUMLAH HARGA BAHAN 227,691.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 323,709.80
E OVERHEAD & PROFIT ( 10% x D ) 32,370.98
F HARGA SATUAN PEKERJAAN ( D + E ) 356,080.78
A.4.4.1.3 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1 Batu dengan Mortar Tipe N,fc' 5,2 Mpa (Setara
Campuran 1 SP : 4 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0300 120,600.00 3,618.00
JUMLAH TENAGA KERJA 96,018.00
BAHAN
Bata Merah Buah 140.0000 1,000.00 140,000.00
B Semen Portland Kg 26.5500 1,890.00 50,179.50
Pasir Pasang M3 0.0930 279,300.00 25,974.90
JUMLAH HARGA BAHAN 216,154.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 312,172.40
E OVERHEAD & PROFIT ( 10% x D ) 31,217.24
F HARGA SATUAN PEKERJAAN ( D + E ) 343,389.64

A.4.4.1.4 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1 Batu dengan Mortar Tipe O,fc' 2,4 Mpa (Setara
Campuran 1 SP : 5 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0300 120,600.00 3,618.00
JUMLAH TENAGA KERJA 96,018.00
BAHAN
Bata Merah Buah 140.0000 1,000.00 140,000.00
B Semen Portland Kg 22.2000 1,890.00 41,958.00
Pasir Pasang M3 0.1020 279,300.00 28,488.60
JUMLAH HARGA BAHAN 210,446.60
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 306,464.60
E OVERHEAD & PROFIT ( 10% x D ) 30,646.46
F HARGA SATUAN PEKERJAAN ( D + E ) 337,111.06

A.4.4.1.5 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1 Batu (Setara Campuran 1 SP : 6 PP (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6000 100,000.00 60,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0300 120,600.00 3,618.00
JUMLAH TENAGA KERJA 96,018.00
BAHAN
Bata Merah Buah 140.0000 1,000.00 140,000.00
B Semen Portland Kg 18.5000 1,890.00 34,965.00
Pasir Pasang M3 0.1220 279,300.00 34,074.60
JUMLAH HARGA BAHAN 209,039.60

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 305,057.60
E OVERHEAD & PROFIT ( 10% x D ) 30,505.76
F HARGA SATUAN PEKERJAAN ( D + E ) 335,563.36

A.4.4.1.7 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1/2 Batu dengan Mortar Tipe M,Fc' 17,7 Mpa (Setara
Campuran 1 SP : 2 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Bata Merah Buah 70.0000 1,000.00 70,000.00
B Semen Portland Kg 18.9500 1,890.00 35,815.50
Pasir Pasang M3 0.0380 279,300.00 10,613.40
JUMLAH HARGA BAHAN 116,428.90
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 164,437.90
E OVERHEAD & PROFIT ( 10% x D ) 16,443.79
F HARGA SATUAN PEKERJAAN ( D + E ) 180,881.69

A.4.4.1.8 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1/2 Batu dengan Mortar Tipe S,Fc' 12,5 Mpa (Setara
Campuran 1 SP : 3 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Bata Merah Buah 70.0000 1,000.00 70,000.00
B Semen Portland Kg 14.3700 1,890.00 27,159.30
Pasir Pasang M3 0.0400 279,300.00 11,172.00
JUMLAH HARGA BAHAN 108,331.30
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 156,340.30
E OVERHEAD & PROFIT ( 10% x D ) 15,634.03
F HARGA SATUAN PEKERJAAN ( D + E ) 171,974.33

A.4.4.1.9 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1/2 Batu dengan Mortar Tipe N,Fc' 5,2 Mpa (Setara
Campuran 1 SP : 4 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Bata Merah Buah 70.0000 1,000.00 70,000.00
B Semen Portland Kg 11.5000 1,890.00 21,735.00
Pasir Pasang M3 0.0430 279,300.00 12,009.90
JUMLAH HARGA BAHAN 103,744.90
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 151,753.90
E OVERHEAD & PROFIT ( 10% x D ) 15,175.39
F HARGA SATUAN PEKERJAAN ( D + E ) 166,929.29

A.4.4.1.10 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1/2 Batu dengan Mortar Tipe O,Fc' 2,4 Mpa (Setara
Campuran 1 SP : 5 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Bata Merah Buah 70.0000 1,000.00 70,000.00
B Semen Portland Kg 9.6800 1,890.00 18,295.20
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 100,863.70
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 148,872.70
E OVERHEAD & PROFIT ( 10% x D ) 14,887.27
F HARGA SATUAN PEKERJAAN ( D + E ) 163,759.97

A.4.4.1.11 Pemasangan 1 M2 Dinding Bata Merah (5 x 11 x 22) Cm Tebal 1/2 Batu Campuran 1 SP : 6 PP (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00
BAHAN
Bata Merah Buah 70.0000 1,000.00 70,000.00
B Semen Portland Kg 8.3200 1,890.00 15,724.80
Pasir Pasang M3 0.0490 279,300.00 13,685.70
JUMLAH HARGA BAHAN 99,410.50

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 147,419.50
E OVERHEAD & PROFIT ( 10% x D ) 14,741.95
F HARGA SATUAN PEKERJAAN ( D + E ) 162,161.45
A.4.4.1.16 Pemasangan 1 M2 Dinding Conblock HB20 dengan Mortar Tipe S,fc' 12,5 Mpa (Setara Campuran 1 SP : 3 PP)
(Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 61,470.80
BAHAN
HB20 Buah 12.5000 6,800.00 85,000.00
Semen Portland Kg 30.3200 1,890.00 57,304.80
B
Pasir Pasang M3 0.7280 279,300.00 203,330.40
Besi Angker Diameter 8 Kg 0.2800 14,673.00 4,108.44
JUMLAH HARGA BAHAN 349,743.64
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 411,214.44
E OVERHEAD & PROFIT ( 10% x D ) 41,121.44
F HARGA SATUAN PEKERJAAN ( D + E ) 452,335.88

A.4.4.1.17 Pemasangan 1 M2 Dinding Conblock HB20 dengan Mortar Tipe N,fc' 5,2 Mpa (Setara Campuran 1 SP : 4 PP)
(Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 61,470.80
BAHAN
HB20 Buah 12.5000 6,800.00 85,000.00
Semen Portland Kg 24.2600 1,890.00 45,851.40
B
Pasir Pasang M3 0.7720 279,300.00 215,619.60
Besi Angker Diameter 8 Kg 0.2800 14,673.00 4,108.44
JUMLAH HARGA BAHAN 350,579.44
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 412,050.24
E OVERHEAD & PROFIT ( 10% x D ) 41,205.02
F HARGA SATUAN PEKERJAAN ( D + E ) 453,255.26

A.4.4.1.18 Pemasangan 1 M2 Dinding Conblock HB15 dengan Mortar Tipe S,fc' 12,5 Mpa (Setara Campuran 1 SP : 3 PP)
(Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3200 100,000.00 32,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
A

Mandor L.04 OH 0.0160 120,600.00 1,929.60


JUMLAH TENAGA KERJA 53,369.60
BAHAN
HB15 Buah 12.5000 5,700.00 71,250.00
Semen Portland Kg 22.7400 1,890.00 42,978.60
B
Pasir Pasang M3 0.5500 279,300.00 153,615.00
Besi Angker Diameter 8 Kg 0.2800 14,673.00 4,108.44
JUMLAH HARGA BAHAN 271,952.04
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 325,321.64
E OVERHEAD & PROFIT ( 10% x D ) 32,532.16
F HARGA SATUAN PEKERJAAN ( D + E ) 357,853.80

A.4.4.1.19 Pemasangan 1 M2 Dinding Conblock HB15 dengan Mortar Tipe N,fc' 5,2 Mpa (Setara Campuran 1 SP : 4 PP)
(Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3200 100,000.00 32,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0160 120,600.00 1,929.60
JUMLAH TENAGA KERJA 53,369.60
BAHAN
HB15 Buah 12.5000 5,700.00 71,250.00
Semen Portland Kg 18.2000 1,890.00 34,398.00
B
Pasir Pasang M3 0.5820 279,300.00 162,552.60
Besi Angker Diameter 8 Kg 0.2800 14,673.00 4,108.44
JUMLAH HARGA BAHAN 272,309.04
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 325,678.64
E OVERHEAD & PROFIT ( 10% x D ) 32,567.86
F HARGA SATUAN PEKERJAAN ( D + E ) 358,246.50

A.4.4.1.22 Pemasangan 1 M2 Dinding Terawang (Rooster) 12 x 11 x 24 dengan Mortar Tipe S,fc' 12,5 Mpa (Setara Campuran 1
SP : 3 PP) (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00

BAHAN
Bata / Beton Berongga Buah 30.0000 12,600.00 378,000.00
B Semen Portland Kg 11.0000 1,890.00 20,790.00
Pasir Pasang M3 0.0350 279,300.00 9,775.50
JUMLAH HARGA BAHAN 408,565.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 456,574.50
E OVERHEAD & PROFIT ( 10% x D ) 45,657.45
F HARGA SATUAN PEKERJAAN ( D + E ) 502,231.95

A.4.4.1.25 Pemasangan 1 M2 Dinding Bata Ringan Tebal 7,5 Cm dengan Mortar Siap Pakai (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6700 100,000.00 67,000.00
Tukang Batu L.02 OH 0.1300 145,000.00 18,850.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 88,421.80
BAHAN
Bata Ringan tebal 7,5 Cm Buah 8.4000 8,400.00 70,560.00
B
Mortar Siap Pakai Kg 0.4730 3,805.00 1,799.77
JUMLAH HARGA BAHAN 72,359.77
PERALATAN
C Alat Bantu 10% 72,359.77 7,235.98
JUMLAH HARGA ALAT 7,235.98
D JUMLAH ( A + B + C ) 168,017.54
E OVERHEAD & PROFIT ( 10% x D ) 16,801.75
F HARGA SATUAN PEKERJAAN ( D + E ) 184,819.30

A.4.4.1.26 Pemasangan 1 M2 Dinding Bata Ringan Tebal 10 Cm dengan Mortar Siap Pakai (Permen PUPR No. 1 Thn 2022)

HARGA SATUAN JUMLAH HARGA


NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6710 100,000.00 67,100.00
Tukang Batu L.02 OH 0.1300 145,000.00 18,850.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 88,521.80
BAHAN
Bata Ringan tebal 10 Cm Buah 8.4000 9,900.00 83,160.00
B
Mortar Siap Pakai Kg 0.0630 3,805.00 239.72
JUMLAH HARGA BAHAN 83,399.72
PERALATAN
C Alat Bantu 10% 83,399.72 8,339.97
JUMLAH HARGA ALAT 8,339.97
D JUMLAH ( A + B + C ) 180,261.49
E OVERHEAD & PROFIT ( 10% x D ) 18,026.15
F HARGA SATUAN PEKERJAAN ( D + E ) 198,287.64
ITEM PEMBAYARAN NO. :7.1 (6a) Analisa EI-716a
JENIS PEKERJAAN :Beton struktur fc’ 25 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Menggunakan alat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
4 Jarak rata-rata Base camp ke lokasi pekerjaan L 8.73 KM
5 Jam kerja efektif per-hari Tk 7.00 jam
6 Perbandingan Camp/m3 beton : Semen Sm 299.0 Kg/M3 Berdasarkan
: Pasir Ps 843.0 Kg/M3 Mix Design ACI
: Agregat Kasar Kr 1,097.0 Kg/M3
: Air Air 185 Kg/M3
: Plasticizer Plt 0.90 Kg/M3
7 Berat Isi :
- Beton D1 2.20 T/M3 Berdasarkan
- Semen D2 1.13 T/M3 Panduan Analisis
- Pasir D3 1.45 T/M3 Harga Satuan
- Agregat Kasar D4 1.45 T/M3
- Air D5 1.00 T/M3
8 Faktor kehilangan bahan : Semen Fh1 1.03
: Agregat/pasir beton Fh2 1.05

II. URUTAN KERJA


1 Semen, pasir, batu kerikil dan air dicampur dan diaduk
menjadi beton dengan menggunakan Concrete Mixing Plant
2 Beton di-cor ke dalam bekisting yang telah disiapkan
3 Penyelesaian dan perapihan setelah pemasangan

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


885
1. BAHAN 1,152 945
1.a. Semen (PC) = Sm x Fh1 (M12) 307.970 Kg ###
1.b. Pasir Beton = (Ps/1000 : D3) x Fh2 (M01a) 0.6104 M3
1.c. Agregat Kasar = (Kr/1000 : D4) x Fh2 (M03) 0.7944 M3
1.d. Kayu Perancah dan/atau Bekisting (M19) 0.4000 M3
1.e. Paku = M19 x 12 (M18) 4.8000 Kg
1.f. Air = Air x Fh1 (M170) 190.550 Ltr
1.g. Plastizier = Plt x Fh1 (M182) 0.924 Kg

2. ALAT
2.a. CONCRETE MIXING PLANT;HZS25; 25 M3/JAM; 15 HP (E80)
Kapasitas Alat V1 500.00 liter
Faktor Efisiensi Alat Fa 0.83 -
Waktu siklus : (T1 + T2 + T3 + T4) Ts
- Memuat T1 0.00 menit
- Mengaduk T2 1.10 menit
- Menuang T3 0.15 menit
- Tunggu, dll. T4 0.00 menit
Ts1 1.25 menit

Kap. Prod. / jam = V1 x Fa x 60 Q1 19.920 M3/jam


1000 x Ts1

Koefisien Alat / M3 = 1 : Q1 (E80) 0.0502 jam

2.b. TRUCK MIXER AGITATOR; UD Q CVE28064; 5 M3; 280 HP (E49)


Kapasitas drum V2 5.00 M3
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata-rata isi v1 20.00 KM / Jam
Kecepatan rata-rata kosong v2 40.00 KM / Jam
Waktu Siklus
- mengisi = (V : Q1) x 60 T1 15.06 menit
- mengangkut = (L : v1) x 60 menit T2 26.18 menit
- Kembali = (L : v2) x 60 menit T3 13.09
Berlanjut ke hal. berikut.
ITEM PEMBAYARAN NO. :7.1 (6a) Analisa EI-716a
JENIS PEKERJAAN :Beton struktur fc’ 25 Mpa
SATUAN PEMBAYARAN :M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

- menumpahkan dll T4 5.00 menit


Ts2 59.32 menit

Kap.Prod. / jam = V2 x Fa x 60 Q2 4.1974 M3


Ts2

Koefisien Alat / M3 = 1 : Q2 (E49) 0.2382 Jam

2.c. CONCRETE VIBRATOR; GX 160; 5,5 HP (E20)


Kebutuhan alat penggetar beton disesuaikan dengan
kapasitas produksi alat pencampur (concrete mixing plant) dibutuhkan n vib 6 buah lihat Spesifikasi
butuh 6 bh utk 20m3
Kap. Prod. / jam = Q1 / n vib Q3 3.320 M3

Koefisien Alat / M3 = 1 : Q3 (E20) 0.3012 jam

2.d. WATER TANK TRUCK (E23)


Volume Tanki Air V 4.00 M3
Kebutuhan air / M3 beton Wc 0.19 M3
Faktor Efiesiensi Alat Fa 0.83 -
Kapasitas pompa air Pa 100.00 liter/menit

Kap. Prod. / jam = pa x Fa x 60 Q3 26.21 M3


1000 x Wc

Koefisien Alat / M3 = 1 : Q3 (E23) 0.0382 jam

2.e. ALAT BANTU


Alat bantu lumpsum

3. TENAGA
Produksi Beton dalam 1 hari = Tk x Q1 Qt 139.44 M3
Kebutuhan tenaga : - Mandor M 1.00 orang
- Tukang : Tb 12.00 orang
Tk batu = 4
Tk Kayu = 8
- Pekerja P 8.00 orang

Koefisien Tenaga / M3 :
- Mandor = (Tk x M) : Qt (L03) 0.0502 jam
- Tukang = (Tk x Tb) : Qt (L02) 0.6024 jam
- Pekerja = (Tk x P) : Qt (L01) 0.4016 jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 2,442,836.01 / M3

6. MASA PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan : ………………… bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : 1.00 M3
Analisa EI-716a

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROYEK :
No. PAKET KONTRAK : ………………………………………………
NAMA PAKET : …………………………………………………………………..
………………………………………………………………….
PROP / KAB / KODYA : ………………………………………………
ITEM PEMBAYARAN NO. :7.1 (6a) PERKIRAAN VOL. PEK.: 1.00
JENIS PEKERJAAN :Beton struktur fc’ 25 Mpa TOTAL HARGA (Rp.) : 1,733,354.24
SATUAN PEMBAYARAN :M3 % THD. BIAYA PROYEK: 0.03

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) jam 0.4016 14,285.71 5,737.23


2. Tukang (L02) jam 0.6024 20,714.29 12,478.49
3. Mandor (L03) jam 0.0502 17,228.57 864.89

JUMLAH HARGA TENAGA 19,080.61

B. BAHAN

1. Semen (M12) Kg 307.9700 1,890.00 582,063.30


2. Pasir Beton (M01a) M3 0.6104 294,000.00 179,471.79
3. Agregat Kasar (M03) M3 0.7944 341,200.00 271,042.22
4. Kayu Perancah (M19) M3 0.4000 1,785,000.00 714,000.00
5. Paku (M18) Kg 4.8000 42,000.00 201,600.00
6. Air (M170) Ltr 190.5500 10.00 1,905.50
7. Plastizier (M182) Kg 0.9239 42,000.00 38,804.22

JUMLAH HARGA BAHAN 1,988,887.03

C. PERALATAN

1. Concrete Mixing Plant (E80) jam 0.0502 660,000.00 33,132.53


2 Truck Mixer (E49) jam 0.2382 600,000.00 142,946.36
3 Concrete Vibrator (E20) jam 0.3012 71,222.06 21,452.43
4 Water Tank Truck (E23) jam 0.0382 400,000.00 15,261.04
5 Alat Bantu Ls 1.0000 5000.00 5,000.00

JUMLAH HARGA PERALATAN 212,792.37

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 2,220,760.01


E. OVERHEAD & PROFIT 10.0 % x D 222,076.00
F. HARGA SATUAN PEKERJAAN ( D + E ) 2,442,836.01
Note: 1 Satuan dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas perkiraan setiap komponen untuk menyelesaikan satu satuan pekerjaan
dari nomor mata pembayaran. Harga Satuan yang disampaikan Penyedia Jasa tidak dapat diubah kecuali
terdapat Penyesuaian Harga (Eskalasi/Deskalasi) sesuai ketentuan dalam Instruksi Kepada Peserta Lelang
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.4.2 HARGA SATUAN PEKERJAAN PELESTERAN


A.4.4.2.1 Pemasangan 1 M2 Pelesteran 1 SP : 1 PP Tebal 15 mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 15.5040 1,890.00 29,302.56
B
Pasir Pasang M3 0.0160 279,300.00 4,468.80
JUMLAH HARGA BAHAN 33,771.36
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 89,880.36
E OVERHEAD & PROFIT ( 10% x D ) 8,988.04
F HARGA SATUAN PEKERJAAN ( D + E ) 98,868.40

A.4.4.2.2 Pemasangan 1 M2 Pelesteran 1 SP : 2 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 10.2240 1,890.00 19,323.36
B
Pasir Pasang M3 0.0200 279,300.00 5,586.00
JUMLAH HARGA BAHAN 24,909.36
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 81,018.36
E OVERHEAD & PROFIT ( 10% x D ) 8,101.84
F HARGA SATUAN PEKERJAAN ( D + E ) 89,120.20
A.4.4.2.3 Pemasangan 1 M2 Pelesteran 1 SP : 3 PP Tebal 15 mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 7.7760 1,890.00 14,696.64
B
Pasir Pasang M3 0.0230 279,300.00 6,423.90
JUMLAH HARGA BAHAN 21,120.54
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 77,229.54
E OVERHEAD & PROFIT ( 10% x D ) 7,722.95
F HARGA SATUAN PEKERJAAN ( D + E ) 84,952.49

A.4.4.2.4 Pemasangan 1 M2 Pelesteran 1 SP : 4 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 6.2400 1,890.00 11,793.60
B
Pasir Pasang M3 0.0240 279,300.00 6,703.20
JUMLAH HARGA BAHAN 18,496.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 74,605.80
E OVERHEAD & PROFIT ( 10% x D ) 7,460.58
F HARGA SATUAN PEKERJAAN ( D + E ) 82,066.38

A.4.4.2.5 Pemasangan 1 M2 Pelesteran 1 SP : 5 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 5.1840 1,890.00 9,797.76
B
Pasir Pasang M3 0.0260 279,300.00 7,261.80
JUMLAH HARGA BAHAN 17,059.56
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 73,168.56
E OVERHEAD & PROFIT ( 10% x D ) 7,316.86
F HARGA SATUAN PEKERJAAN ( D + E ) 80,485.42

A.4.4.2.6 Pemasangan 1 M2 Pelesteran 1 SP : 6 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 4.4160 1,890.00 8,346.24
B
Pasir Pasang M3 0.0270 279,300.00 7,541.10
JUMLAH HARGA BAHAN 15,887.34
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 71,996.34
E OVERHEAD & PROFIT ( 10% x D ) 7,199.63
F HARGA SATUAN PEKERJAAN ( D + E ) 79,195.97

A.4.4.2.7 Pemasangan 1 M2 Pelesteran 1 SP : 7 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 3.9360 1,890.00 7,439.04
B
Pasir Pasang M3 0.0280 279,300.00 7,820.40
JUMLAH HARGA BAHAN 15,259.44
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 71,368.44
E OVERHEAD & PROFIT ( 10% x D ) 7,136.84
F HARGA SATUAN PEKERJAAN ( D + E ) 78,505.28

A.4.4.2.8 Pemasangan 1 M2 Pelesteran 1 SP : 8 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 56,109.00
BAHAN
Semen Portland Kg 3.4560 1,890.00 6,531.84
B
Pasir Pasang M3 0.0290 279,300.00 8,099.70
JUMLAH HARGA BAHAN 14,631.54
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 70,740.54
E OVERHEAD & PROFIT ( 10% x D ) 7,074.05
F HARGA SATUAN PEKERJAAN ( D + E ) 77,814.59

A.4.4.2.9 Pemasangan 1 M2 Pelesteran 1 SP : 1/2 KP : 3 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3600 100,000.00 36,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 57,610.80
BAHAN
Semen Portland Kg 5.7600 1,890.00 10,886.40
B Kerikil Pasang M3 0.0030 288,700.00 866.10
Pasir Pasang M3 0.0130 279,300.00 3,630.90
JUMLAH HARGA BAHAN 15,383.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 72,994.20
E OVERHEAD & PROFIT ( 10% x D ) 7,299.42
F HARGA SATUAN PEKERJAAN ( D + E ) 80,293.62

A.4.4.2.10 Pemasangan 1 M2 Pelesteran 1 SP : 2 KP : 8 PP Tebal 15 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3600 100,000.00 36,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0180 120,600.00 2,170.80
JUMLAH TENAGA KERJA 57,610.80
BAHAN
Semen Portland Kg 3.0000 1,890.00 5,670.00
B Kerikil Pasang M3 0.0050 288,700.00 1,443.50
Pasir Pasang M3 0.0200 279,300.00 5,586.00
JUMLAH HARGA BAHAN 12,699.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 70,310.30
E OVERHEAD & PROFIT ( 10% x D ) 7,031.03
F HARGA SATUAN PEKERJAAN ( D + E ) 77,341.33

A.4.4.2.11 Pemasangan 1 M2 Pelesteran 1 SP : 3 PP Tebal 20 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2600 100,000.00 26,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 59,967.80
BAHAN
Semen Portland Kg 10.3680 1,890.00 19,595.52
B
Pasir Pasang M3 0.0310 279,300.00 8,658.30
JUMLAH HARGA BAHAN 28,253.82

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 88,221.62
E OVERHEAD & PROFIT ( 10% x D ) 8,822.16
F HARGA SATUAN PEKERJAAN ( D + E ) 97,043.78

A.4.4.2.12 Pemasangan 1 M2 Pelesteran 1 SP : 4 PP Tebal 20 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0220 120,600.00 2,653.20
JUMLAH TENAGA KERJA 75,053.20
BAHAN
Semen Portland Kg 8.3200 1,890.00 15,724.80
B
Pasir Pasang M3 0.0320 279,300.00 8,937.60
JUMLAH HARGA BAHAN 24,662.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 99,715.60
E OVERHEAD & PROFIT ( 10% x D ) 9,971.56
F HARGA SATUAN PEKERJAAN ( D + E ) 109,687.16

A.4.4.2.13 Pemasangan 1 M2 Pelesteran 1 SP : 5 PP Tebal 20 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.4000 100,000.00 40,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0220 120,600.00 2,653.20
JUMLAH TENAGA KERJA 75,053.20
BAHAN
Semen Portland Kg 6.9120 1,890.00 13,063.68
B
Pasir Pasang M3 0.0350 279,300.00 9,775.50
JUMLAH HARGA BAHAN 22,839.18
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 97,892.38
E OVERHEAD & PROFIT ( 10% x D ) 9,789.24
F HARGA SATUAN PEKERJAAN ( D + E ) 107,681.62

A.4.4.2.14 Pemasangan 1 M2 Pelesteran Ciprat 1 SP : 2 PP


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3000 100,000.00 30,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 48,009.00

BAHAN
Semen Portland Kg 4.3200 1,890.00 8,164.80
B
Pasir Pasang M3 0.0060 279,300.00 1,675.80
JUMLAH HARGA BAHAN 9,840.60
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 57,849.60
E OVERHEAD & PROFIT ( 10% x D ) 5,784.96
F HARGA SATUAN PEKERJAAN ( D + E ) 63,634.56

A.4.4.2.15 Pemasangan 1 M2 Acian


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 37,406.00
BAHAN
B Semen Portland Kg 3.2500 1,890.00 6,142.50
JUMLAH HARGA BAHAN 6,142.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 43,548.50
E OVERHEAD & PROFIT ( 10% x D ) 4,354.85
F HARGA SATUAN PEKERJAAN ( D + E ) 47,903.35
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.6.2 ANALISA HARGA SATUAN PEKERJAAN KUNCI DAN KACA


A.4.6.2.1 Pemasangan 1 Buah Kunci Tanam Dekkson LHTR 0820
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 103,561.80
BAHAN
B Kunci Tanam Dekkson LHTR 0820 Bh 1.0000 525,000.00 525,000.00
JUMLAH HARGA BAHAN 525,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 628,561.80
E OVERHEAD & PROFIT ( 10% x D ) 62,856.18
F HARGA SATUAN PEKERJAAN ( D + E ) 691,417.98

A.4.6.2.2 Pemasangan 1 Buah Kunci Tanam Yale


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 103,561.80
BAHAN
B Kunci Tanam Yale Bh 1.0000 168,000.00 168,000.00
JUMLAH HARGA BAHAN 168,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 271,561.80
E OVERHEAD & PROFIT ( 10% x D ) 27,156.18
F HARGA SATUAN PEKERJAAN ( D + E ) 298,717.98
A.4.6.2.3 Pemasangan 1 Buah Kunci Kamar Mandi
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0050 100,000.00 500.00
Tukang Kayu L.02 OH 0.5000 145,000.00 72,500.00
A
Kepala Tukang L.03 OH 0.0500 170,000.00 8,500.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 81,861.80
BAHAN
B Kunci Tanam Km/Wc Bh 1.0000 47,200.00 47,200.00
JUMLAH HARGA BAHAN 47,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 129,061.80
E OVERHEAD & PROFIT ( 10% x D ) 12,906.18
F HARGA SATUAN PEKERJAAN ( D + E ) 141,967.98

A.4.6.2.4 Pemasangan 1 Buah Engsel Pintu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
B Engsel Pintu Kualitas Baik Bh 1.0000 57,700.00 57,700.00
JUMLAH HARGA BAHAN 57,700.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 83,596.48
E OVERHEAD & PROFIT ( 10% x D ) 8,359.65
F HARGA SATUAN PEKERJAAN ( D + E ) 91,956.13

A.4.6.2.5 Pemasangan 1 Buah Engsel Jendela Kupu-kupu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0005 120,600.00 60.30
JUMLAH TENAGA KERJA 17,260.30
BAHAN
B Engsel Kupu-kupu Bh 1.0000 36,700.00 36,700.00
JUMLAH HARGA BAHAN 36,700.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 53,960.30
E OVERHEAD & PROFIT ( 10% x D ) 5,396.03
F HARGA SATUAN PEKERJAAN ( D + E ) 59,356.33

A.4.6.2.6 Pemasangan 1 Buah Kait Angin Khusus Kualitas Baik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Kait Angin Khusus Bh 1.0000 26,200.00 26,200.00
JUMLAH HARGA BAHAN 26,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 52,964.80
E OVERHEAD & PROFIT ( 10% x D ) 5,296.48
F HARGA SATUAN PEKERJAAN ( D + E ) 58,261.28

A.4.6.2.7 Pemasangan 1 Buah Grendel Pintu Kualitas Baik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Grendel Pintu Bh 1.0000 34,600.00 34,600.00
JUMLAH HARGA BAHAN 34,600.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 61,364.80
E OVERHEAD & PROFIT ( 10% x D ) 6,136.48
F HARGA SATUAN PEKERJAAN ( D + E ) 67,501.28

A.4.6.2.8 Pemasangan 1 Buah Grendel Jendela Kualitas Baik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Grendel Jendela Bh 1.0000 17,800.00 17,800.00
JUMLAH HARGA BAHAN 17,800.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 44,564.80
E OVERHEAD & PROFIT ( 10% x D ) 4,456.48
F HARGA SATUAN PEKERJAAN ( D + E ) 49,021.28

A.4.6.2.9 Pemasangan 1 Buah Gagang Jendela Kualitas Baik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Gagang Jendela Bh 1.0000 15,700.00 15,700.00
JUMLAH HARGA BAHAN 15,700.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 42,464.80
E OVERHEAD & PROFIT ( 10% x D ) 4,246.48
F HARGA SATUAN PEKERJAAN ( D + E ) 46,711.28

A.4.6.2.10 Pemasangan 1 Buah Door Closer


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.5000 145,000.00 72,500.00
A
Kepala Tukang L.03 OH 0.0500 170,000.00 8,500.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 86,361.80
BAHAN
B Door Closer Bh 1.0000 157,500.00 157,500.00
JUMLAH HARGA BAHAN 157,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 243,861.80
E OVERHEAD & PROFIT ( 10% x D ) 24,386.18
F HARGA SATUAN PEKERJAAN ( D + E ) 268,247.98

A.4.6.2.11 Pemasangan 1 Buah Door Holder


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.5000 145,000.00 72,500.00
A
Kepala Tukang L.03 OH 0.0500 170,000.00 8,500.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 86,361.80
BAHAN
B Door Holder Bh 1.0000 47,200.00 47,200.00
JUMLAH HARGA BAHAN 47,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 133,561.80
E OVERHEAD & PROFIT ( 10% x D ) 13,356.18
F HARGA SATUAN PEKERJAAN ( D + E ) 146,917.98

A.4.6.2.12 Pemasangan 1 Buah Door Pull Stainless (60 cm)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 17,803.00
BAHAN
B Door Pull Stainless (60 cm) Psg 1.0000 236,200.00 236,200.00
JUMLAH HARGA BAHAN 236,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 254,003.00
E OVERHEAD & PROFIT ( 10% x D ) 25,400.30
F HARGA SATUAN PEKERJAAN ( D + E ) 279,403.30

A.4.6.2.13 Pemasangan 1 Buah Rel Pintu Sorong D4 Dekkson


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 103,561.80
BAHAN
B Rel Pintu Sorong D4 Dekkson Set 1.0000 430,500.00 430,500.00
JUMLAH HARGA BAHAN 430,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 534,061.80
E OVERHEAD & PROFIT ( 10% x D ) 53,406.18
F HARGA SATUAN PEKERJAAN ( D + E ) 587,467.98

A.4.6.2.14 Pemasangan 1 M2 Kaca Tebal 3 mm (Bening)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
Kaca Tebal 3 mm (Bening) M2 1.1000 122,800.00 135,080.00
B
Sealant Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 137,180.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 163,076.48
E OVERHEAD & PROFIT ( 10% x D ) 16,307.65
F HARGA SATUAN PEKERJAAN ( D + E ) 179,384.13

A.4.6.2.15 Pemasangan 1 M2 Kaca Tebal 3 mm (Rayban)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
Kaca Tebal 3 mm (Rayban) M2 1.1000 111,300.00 122,430.00
B
Sealant Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 124,530.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 150,426.48
E OVERHEAD & PROFIT ( 10% x D ) 15,042.65
F HARGA SATUAN PEKERJAAN ( D + E ) 165,469.13

A.4.6.2.16 Pemasangan 1 M2 Kaca Tebal 5 mm (Bening)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
Kaca Tebal 5 mm (Bening) M2 1.1000 134,400.00 147,840.00
B
Sealant Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 149,940.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 175,836.48
E OVERHEAD & PROFIT ( 10% x D ) 17,583.65
F HARGA SATUAN PEKERJAAN ( D + E ) 193,420.13

A.4.6.2.17 Pemasangan 1 M2 Kaca Tebal 5 mm (Rayban)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
Kaca Tebal 5 mm (Rayban) M2 1.1000 123,900.00 136,290.00
B
Sealant Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 138,390.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 164,286.48
E OVERHEAD & PROFIT ( 10% x D ) 16,428.65
F HARGA SATUAN PEKERJAAN ( D + E ) 180,715.13

A.4.6.2.18 Pemasangan 1 M2 Kaca Tebal 8 mm Bening


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0170 100,000.00 1,700.00
Tukang Kayu L.02 OH 0.1700 145,000.00 24,650.00
A
Kepala Tukang L.03 OH 0.0170 170,000.00 2,890.00
Mandor L.04 OH 0.0009 120,600.00 108.54
JUMLAH TENAGA KERJA 29,348.54
BAHAN

B
Kaca Tebal 8 mm M2 1.1000 183,700.00 202,070.00
B
Sealant Kg 0.0700 42,000.00 2,940.00
JUMLAH HARGA BAHAN 205,010.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 234,358.54
E OVERHEAD & PROFIT ( 10% x D ) 23,435.85
F HARGA SATUAN PEKERJAAN ( D + E ) 257,794.39

A.4.6.2.19 Pemasangan 1 M2 Kaca Tempered Tebal 12 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
Tukang Kayu L.02 OH 0.2500 145,000.00 36,250.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0013 120,600.00 156.78
JUMLAH TENAGA KERJA 43,156.78
BAHAN
Kaca Tempered Tebal 12 mm M2 1.1000 556,500.00 612,150.00
B
Sealant Kg 0.0700 42,000.00 2,940.00
JUMLAH HARGA BAHAN 615,090.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 658,246.78
E OVERHEAD & PROFIT ( 10% x D ) 65,824.68
F HARGA SATUAN PEKERJAAN ( D + E ) 724,071.46

A.4.6.2.20 Pemasangan 1 Buah Floor Hinge setara Dekkson


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.5000 145,000.00 72,500.00
A
Kepala Tukang L.03 OH 0.0500 170,000.00 8,500.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 86,361.80
BAHAN
B Floor Hinge Set 1.0000 682,500.00 682,500.00
JUMLAH HARGA BAHAN 682,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 768,861.80
E OVERHEAD & PROFIT ( 10% x D ) 76,886.18
F HARGA SATUAN PEKERJAAN ( D + E ) 845,747.98

A.4.6.2.21 Pemasangan 1 Buah Top Hinge


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Top Hinge Bh 1.0000 68,200.00 68,200.00
JUMLAH HARGA BAHAN 68,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 94,964.80
E OVERHEAD & PROFIT ( 10% x D ) 9,496.48
F HARGA SATUAN PEKERJAAN ( D + E ) 104,461.28

A.4.6.2.22 Pemasangan 1 Buah Fitting Patch Atas / Bawah


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Fitting Patch Bh 1.0000 262,500.00 262,500.00
JUMLAH HARGA BAHAN 262,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 289,264.80
E OVERHEAD & PROFIT ( 10% x D ) 28,926.48
F HARGA SATUAN PEKERJAAN ( D + E ) 318,191.28

A.4.6.2.23 Pemasangan 1 Buah Gagang Pintu Kaca Stainless 0,8 - 1 m


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Gagang Pintu Bh 1.0000 315,000.00 315,000.00
JUMLAH HARGA BAHAN 315,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 341,764.80
E OVERHEAD & PROFIT ( 10% x D ) 34,176.48
F HARGA SATUAN PEKERJAAN ( D + E ) 375,941.28

A.4.6.2.24 Pemasangan 1 Buah Kunci Pintu Kaca


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Kunci Pintu Kaca Bh 1.0000 525,000.00 525,000.00
JUMLAH HARGA BAHAN 525,000.00
PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 551,764.80
E OVERHEAD & PROFIT ( 10% x D ) 55,176.48
F HARGA SATUAN PEKERJAAN ( D + E ) 606,941.28

A.4.6.2.25 Pemasangan 1 Buah Engsel Casement 8"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0005 120,600.00 60.30
JUMLAH TENAGA KERJA 17,260.30
BAHAN
B Engsel Casement 8" Bh 1.0000 50,200.00 50,200.00
JUMLAH HARGA BAHAN 50,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 67,460.30
E OVERHEAD & PROFIT ( 10% x D ) 6,746.03
F HARGA SATUAN PEKERJAAN ( D + E ) 74,206.33

A.4.6.2.26 Pemasangan 1 Buah Engsel Casement 10"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0005 120,600.00 60.30
JUMLAH TENAGA KERJA 17,260.30
BAHAN
B Engsel Casement 10" Bh 1.0000 55,400.00 55,400.00
JUMLAH HARGA BAHAN 55,400.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 72,660.30
E OVERHEAD & PROFIT ( 10% x D ) 7,266.03
F HARGA SATUAN PEKERJAAN ( D + E ) 79,926.33

A.4.6.2.27 Pemasangan 1 Buah Engsel Casement 12"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0005 120,600.00 60.30
JUMLAH TENAGA KERJA 17,260.30
BAHAN
B Engsel Casement 12" Bh 1.0000 60,600.00 60,600.00
JUMLAH HARGA BAHAN 60,600.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 77,860.30
E OVERHEAD & PROFIT ( 10% x D ) 7,786.03
F HARGA SATUAN PEKERJAAN ( D + E ) 85,646.33

A.4.6.2.28 Pemasangan 1 Buah Kunci Gagang Kunci Rambuncis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Kunci Gagang Rambuncis Bh 1.0000 23,100.00 23,100.00
JUMLAH HARGA BAHAN 23,100.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 49,864.80
E OVERHEAD & PROFIT ( 10% x D ) 4,986.48
F HARGA SATUAN PEKERJAAN ( D + E ) 54,851.28

A.4.6.2.29 Pemasangan 1 Buah Gagang Pintu Km/Wc Bulat Plastik


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0005 120,600.00 60.30
JUMLAH TENAGA KERJA 17,260.30
BAHAN
B Gagang Plastik Bh 1.0000 24,100.00 24,100.00
JUMLAH HARGA BAHAN 24,100.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 41,360.30
E OVERHEAD & PROFIT ( 10% x D ) 4,136.03
F HARGA SATUAN PEKERJAAN ( D + E ) 45,496.33

A.4.6.2.30 Pemasangan 1 Buah Engsel Pintu Km/Wc


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
B Engsel Pintu Km/Wc Bh 1.0000 17,300.00 17,300.00
JUMLAH HARGA BAHAN 17,300.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 43,196.48
E OVERHEAD & PROFIT ( 10% x D ) 4,319.65
F HARGA SATUAN PEKERJAAN ( D + E ) 47,516.13
A.4.6.2.31 Pemasangan 1 Buah Grendel Pintu Km/Wc
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0008 120,600.00 96.48
JUMLAH TENAGA KERJA 25,896.48
BAHAN
B Grendel Pintu Km/Wc Bh 1.0000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 21,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 46,896.48
E OVERHEAD & PROFIT ( 10% x D ) 4,689.65
F HARGA SATUAN PEKERJAAN ( D + E ) 51,586.13

A.4.6.2.32 Pemasangan 1 Buah Kunci Pintu Sorong Dekkson KC8423


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 103,561.80
BAHAN
B Kunci Tanam Sorong Dekkson KC8423 Bh 1.0000 113,400.00 113,400.00
JUMLAH HARGA BAHAN 113,400.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 216,961.80
E OVERHEAD & PROFIT ( 10% x D ) 21,696.18
F HARGA SATUAN PEKERJAAN ( D + E ) 238,657.98

A.4.6.2.33 Pemasangan 1 Buah Master Kunci Pintu / Silinder


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0150 100,000.00 1,500.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 26,764.80
BAHAN
B Silinder Master Kunci Pintu Bh 1.0000 157,500.00 157,500.00
JUMLAH HARGA BAHAN 157,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 184,264.80
E OVERHEAD & PROFIT ( 10% x D ) 18,426.48
F HARGA SATUAN PEKERJAAN ( D + E ) 202,691.28
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.4.3 ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.1 Pemasangan 1 M2 Lantai Ubin Warna ukuran 40 Cm x 40 Cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Batu L.02 OH 0.1250 145,000.00 18,125.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 46,902.80
BAHAN
Ubin Warna Bh 6.6300 13,650.00 90,499.50
Semen Portland Kg 9.8000 1,890.00 18,522.00
B
Semen Warna Kg 0.6000 15,200.00 9,120.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 130,710.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 177,612.80
E OVERHEAD & PROFIT ( 10% x D ) 17,761.28
F HARGA SATUAN PEKERJAAN ( D + E ) 195,374.08

A.4.4.3.2 Pemasangan 1 M2 Lantai Ubin Warna ukuran 40 Cm x 40 Cm (Kasar)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Batu L.02 OH 0.1250 145,000.00 18,125.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 46,902.80
BAHAN
Ubin Warna (Kasar) Bh 6.6300 18,900.00 125,307.00
Semen Portland Kg 9.8000 1,890.00 18,522.00
B
Semen Warna Kg 0.6000 15,200.00 9,120.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 165,517.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 212,420.30
E OVERHEAD & PROFIT ( 10% x D ) 21,242.03
F HARGA SATUAN PEKERJAAN ( D + E ) 233,662.33
A.4.4.3.3 Pemasangan 1 M2 Lantai Ubin Warna ukuran 30 Cm x 30 Cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Batu L.02 OH 0.1250 145,000.00 18,125.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 46,902.80
BAHAN
Ubin Warna Bh 11.8700 6,009.09 71,327.91
Semen Portland Kg 10.0000 1,890.00 18,900.00
B
Semen Warna Kg 0.6000 15,200.00 9,120.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 111,916.41
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 158,819.21
E OVERHEAD & PROFIT ( 10% x D ) 15,881.92
F HARGA SATUAN PEKERJAAN ( D + E ) 174,701.13

A.4.4.3.4 Pemasangan 1 M2 Lantai Ubin Warna ukuran 30 Cm x 30 Cm (Kasar)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Batu L.02 OH 0.1250 145,000.00 18,125.00
A
Kepala Tukang L.03 OH 0.0130 170,000.00 2,210.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 46,902.80
BAHAN
Ubin Warna Bh 11.8700 7,918.18 93,988.82
Semen Portland Kg 10.0000 1,890.00 18,900.00
B
Semen Warna Kg 0.6000 15,200.00 9,120.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 134,577.32
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 181,480.12
E OVERHEAD & PROFIT ( 10% x D ) 18,148.01
F HARGA SATUAN PEKERJAAN ( D + E ) 199,628.13

A.4.4.3.5 Pemasangan 1 M2 Lantai Ubin Warna ukuran 20 Cm x 20 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2700 100,000.00 27,000.00
Tukang Batu L.02 OH 0.1350 145,000.00 19,575.00
A
Kepala Tukang L.03 OH 0.0140 170,000.00 2,380.00
Mandor L.04 OH 0.0140 120,600.00 1,688.40
JUMLAH TENAGA KERJA 50,643.40
BAHAN
Ubin Warna Bh 26.5000 3,360.00 89,040.00

B
Semen Portland Kg 10.4000 1,890.00 19,656.00
B
Semen Warna Kg 1.0000 15,200.00 15,200.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 136,464.50

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 187,107.90
E OVERHEAD & PROFIT ( 10% x D ) 18,710.79
F HARGA SATUAN PEKERJAAN ( D + E ) 205,818.69

A.4.4.3.6 Pemasangan 1 M2 Lantai Granit ukuran 60 Cm x 60 Cm (Polished)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2400 100,000.00 24,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0120 120,600.00 1,447.20
JUMLAH TENAGA KERJA 44,887.20
BAHAN
Granit 60 x 60 Cm Bh 3.1000 48,550.00 150,505.00
Semen Portland Kg 9.6000 1,890.00 18,144.00
B
Semen Warna Kg 1.5000 15,200.00 22,800.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 204,017.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 248,904.70
E OVERHEAD & PROFIT ( 10% x D ) 24,890.47
F HARGA SATUAN PEKERJAAN ( D + E ) 273,795.17

A.4.4.3.7 Pemasangan 1 M2 Lantai Granit ukuran 60 Cm x 60 Cm (UnPolished)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2400 100,000.00 24,000.00
Tukang Batu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0120 120,600.00 1,447.20
JUMLAH TENAGA KERJA 44,887.20
BAHAN
Granit 60 x 60 Cm Kasar Bh 3.1000 55,125.00 170,887.50
Semen Portland Kg 9.6000 1,890.00 18,144.00
B
Semen Warna Kg 1.5000 15,200.00 22,800.00
Pasir Pasang M3 0.0450 279,300.00 12,568.50
JUMLAH HARGA BAHAN 224,400.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 269,287.20
E OVERHEAD & PROFIT ( 10% x D ) 26,928.72
F HARGA SATUAN PEKERJAAN ( D + E ) 296,215.92
A.4.4.3.8 Pemasangan 1 M2 Step Nosing ukuran 30 Cm x 60 Cm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1875 100,000.00 18,750.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0250 120,600.00 3,015.00
JUMLAH TENAGA KERJA 39,065.00
BAHAN
Granit Step Nosing 30 x 60 Cm Buah 1.6000 78,700.00 125,920.00
Semen Portland Kg 7.3250 1,890.00 13,844.25
B
Semen Warna Kg 1.0000 15,200.00 15,200.00
Pasir Pasang M3 0.0320 279,300.00 8,937.60
JUMLAH HARGA BAHAN 163,901.85
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 202,966.85
E OVERHEAD & PROFIT ( 10% x D ) 20,296.69
F HARGA SATUAN PEKERJAAN ( D + E ) 223,263.54

A.4.4.3.9 Pemasangan 1 M1 Plint Ubin Warna ukuran 10 Cm x 40 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0900 100,000.00 9,000.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 24,183.00
BAHAN
Plint Ubin Warna Bh 2.6500 26,200.00 69,430.00
Semen Portland Kg 1.1400 1,890.00 2,154.60
B
Semen Warna Kg 0.1000 15,200.00 1,520.00
Pasir Pasang M3 0.0030 279,300.00 837.90
JUMLAH HARGA BAHAN 73,942.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 98,125.50
E OVERHEAD & PROFIT ( 10% x D ) 9,812.55
F HARGA SATUAN PEKERJAAN ( D + E ) 107,938.05

A.4.4.3.10 Pemasangan 1 M1 Plint Ubin Teralux Marmer ukuran 10 Cm x 60 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0900 100,000.00 9,000.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 24,183.00
BAHAN
Plint Ubin Teralux Marmer Bh 1.7000 36,700.00 62,390.00
Semen Portland Kg 1.1400 1,890.00 2,154.60
B
Semen Warna Kg 0.1000 15,200.00 1,520.00
Pasir Pasang M3 0.0030 279,300.00 837.90
JUMLAH HARGA BAHAN 66,902.50

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 91,085.50
E OVERHEAD & PROFIT ( 10% x D ) 9,108.55
F HARGA SATUAN PEKERJAAN ( D + E ) 100,194.05

A.4.4.3.11 Pemasangan 1 M2 Lantai Marmer ukuran 100 Cm x 100 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang Batu L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.0350 120,600.00 4,221.00
JUMLAH TENAGA KERJA 130,921.00
BAHAN
Lantai Marmer Bh 1.0600 139,100.00 147,446.00
Semen Portland Kg 8.1900 1,890.00 15,479.10
B
Semen Warna Kg 0.0450 15,200.00 684.00
Pasir Pasang M3 0.6500 279,300.00 181,545.00
JUMLAH HARGA BAHAN 345,154.10
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 476,075.10
E OVERHEAD & PROFIT ( 10% x D ) 47,607.51
F HARGA SATUAN PEKERJAAN ( D + E ) 523,682.61

A.4.4.3.12 Pemasangan 1 M2 Lantai Karpet


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1700 100,000.00 17,000.00
Tukang Kayu L.02 OH 0.1700 145,000.00 24,650.00
A
Kepala Tukang L.03 OH 0.0170 170,000.00 2,890.00
Mandor L.04 OH 0.0090 120,600.00 1,085.40
JUMLAH TENAGA KERJA 45,625.40
BAHAN
Karpet M2 1.0500 173,200.00 181,860.00
B
Lem Kg 0.3500 18,900.00 6,615.00
JUMLAH HARGA BAHAN 188,475.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 234,100.40
E OVERHEAD & PROFIT ( 10% x D ) 23,410.04
F HARGA SATUAN PEKERJAAN ( D + E ) 257,510.44
A.4.4.3.13 Pemasangan 1 M2 Underlayer (Pelapis Bawah Karpet)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1700 100,000.00 17,000.00
Tukang Kayu L.02 OH 0.1700 145,000.00 24,650.00
A
Kepala Tukang L.03 OH 0.0170 170,000.00 2,890.00
Mandor L.04 OH 0.0090 120,600.00 1,085.40
JUMLAH TENAGA KERJA 45,625.40

BAHAN
Underlayer M2 1.0500 91,800.00 96,390.00
B
Lem Kg 0.3500 18,900.00 6,615.00
JUMLAH HARGA BAHAN 103,005.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 148,630.40
E OVERHEAD & PROFIT ( 10% x D ) 14,863.04
F HARGA SATUAN PEKERJAAN ( D + E ) 163,493.44

A.4.4.3.14 Pemasangan 1 M2 Dinding Keramik 10 Cm x 20 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Tukang Batu L.02 OH 0.4500 145,000.00 65,250.00
A
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 168,327.00
BAHAN
Keramik Bh 53.0000 2,100.00 111,300.00
Semen Portland Kg 9.3000 1,890.00 17,577.00
B
Pasir Pasang M3 0.0180 279,300.00 5,027.40
Semen Warna Kg 2.7500 15,200.00 41,800.00
JUMLAH HARGA BAHAN 175,704.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 344,031.40
E OVERHEAD & PROFIT ( 10% x D ) 34,403.14
F HARGA SATUAN PEKERJAAN ( D + E ) 378,434.54

A.4.4.3.15 Pemasangan 1 M2 Dinding Keramik 20 Cm x 20 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Tukang Batu L.02 OH 0.4500 145,000.00 65,250.00
A
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 168,327.00
BAHAN
Keramik Bh 26.5000 3,360.00 89,040.00
Semen Portland Kg 9.3000 1,890.00 17,577.00
B
B
Pasir Pasang M3 0.0180 279,300.00 5,027.40
Semen Warna Kg 1.9400 15,200.00 29,488.00
JUMLAH HARGA BAHAN 141,132.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 309,459.40
E OVERHEAD & PROFIT ( 10% x D ) 30,945.94
F HARGA SATUAN PEKERJAAN ( D + E ) 340,405.34

A.4.4.3.16 Pemasangan 1 M2 Dinding Keramik 30 Cm x 30 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Tukang Batu L.02 OH 0.4500 145,000.00 65,250.00
A
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 168,327.00
BAHAN
Keramik Bh 11.8700 6,009.09 71,327.91
Semen Portland Kg 8.0000 1,890.00 15,120.00
B
Pasir Pasang M3 0.0180 279,300.00 5,027.40
Semen Warna Kg 0.0130 15,200.00 197.60
JUMLAH HARGA BAHAN 91,672.91
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 259,999.91
E OVERHEAD & PROFIT ( 10% x D ) 25,999.99
F HARGA SATUAN PEKERJAAN ( D + E ) 285,999.90

A.4.4.3.17 Pemasangan 1 M2 Dinding Keramik 25 Cm x 40 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.9000 100,000.00 90,000.00
Tukang Batu L.02 OH 0.4500 145,000.00 65,250.00
A
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0450 120,600.00 5,427.00
JUMLAH TENAGA KERJA 168,327.00
BAHAN
Keramik Bh 10.8700 8,920.00 96,960.40
Semen Portland Kg 8.0000 1,890.00 15,120.00
B
Pasir Pasang M3 0.0180 279,300.00 5,027.40
Semen Warna Kg 0.0130 15,200.00 197.60
JUMLAH HARGA BAHAN 117,305.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 285,632.40
E OVERHEAD & PROFIT ( 10% x D ) 28,563.24
F HARGA SATUAN PEKERJAAN ( D + E ) 314,195.64

A.4.4.3.18 Pemasangan 1 M2 Dinding Batu Tempel


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang Batu L.02 OH 0.3500 145,000.00 50,750.00
A
Kepala Tukang L.03 OH 0.0350 170,000.00 5,950.00
Mandor L.04 OH 0.0350 120,600.00 4,221.00
JUMLAH TENAGA KERJA 130,921.00
BAHAN
Batu Tempel Hitam M2 1.1000 294,200.00 323,620.00
B Semen Portland Kg 11.7500 1,890.00 22,207.50
Pasir Pasang M3 0.0350 279,300.00 9,775.50
JUMLAH HARGA BAHAN 355,603.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 486,524.00
E OVERHEAD & PROFIT ( 10% x D ) 48,652.40
F HARGA SATUAN PEKERJAAN ( D + E ) 535,176.40

A.4.4.3.19 Pemasangan 1 M2 Lantai Vynil ukuran 30 Cm x 30 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Batu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 40,264.80
BAHAN
Vynil Bh 11.8700 52,500.00 623,175.00
B
Lem Kg 0.3500 126,000.00 44,100.00
JUMLAH HARGA BAHAN 667,275.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 707,539.80
E OVERHEAD & PROFIT ( 10% x D ) 70,753.98
F HARGA SATUAN PEKERJAAN ( D + E ) 778,293.78

A.4.4.3.20 Pemasangan 1 M2 Wallpaper Lebar 50 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.3500 100,000.00 35,000.00
Tukang Batu L.02 OH 0.1750 145,000.00 25,375.00
A
Kepala Tukang L.03 OH 0.0170 170,000.00 2,890.00
Mandor L.04 OH 0.0020 120,600.00 241.20
JUMLAH TENAGA KERJA 63,506.20
BAHAN
Wallpaper M 2.2000 84,000.00 184,800.00
B
Lem Kg 0.2500 15,700.00 3,925.00
B

JUMLAH HARGA BAHAN 188,725.00


PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 252,231.20
E OVERHEAD & PROFIT ( 10% x D ) 25,223.12
F HARGA SATUAN PEKERJAAN ( D + E ) 277,454.32

A.4.4.3.21 Pemasangan 1 M1 Plint Vynil 15 Cm x 30 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0800 100,000.00 8,000.00
Tukang Batu L.02 OH 0.0800 145,000.00 11,600.00
A
Kepala Tukang L.03 OH 0.0080 170,000.00 1,360.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 21,442.40

BAHAN
Vynil Bh 1.7600 141,700.00 249,392.00
B
Lem Kg 0.0800 126,000.00 10,080.00
JUMLAH HARGA BAHAN 259,472.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 280,914.40
E OVERHEAD & PROFIT ( 10% x D ) 28,091.44
F HARGA SATUAN PEKERJAAN ( D + E ) 309,005.84

A.4.4.3.22 Pemasangan 1 M2 Paving Block Natural Tebal 6 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 48,606.00
BAHAN
Paving Block 6 Cm M2 1.0100 161,700.00 163,317.00
B
Pasir Beton M3 0.0800 279,300.00 22,344.00
JUMLAH HARGA BAHAN 185,661.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 234,267.00
E OVERHEAD & PROFIT ( 10% x D ) 23,426.70
F HARGA SATUAN PEKERJAAN ( D + E ) 257,693.70

A.4.4.3.23 Pemasangan 1 M2 Paving Block Natural Tebal 8 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00

A
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 48,606.00
BAHAN
Paving Block 8 Cm M2 1.0100 170,900.00 172,609.00
B
Pasir Beton Kg 0.0800 279,300.00 22,344.00
JUMLAH HARGA BAHAN 194,953.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 243,559.00
E OVERHEAD & PROFIT ( 10% x D ) 24,355.90
F HARGA SATUAN PEKERJAAN ( D + E ) 267,914.90

A.4.4.3.24 Pemasangan 1 M1 Kanstin 40 x 15 x 28 cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Batu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 48,606.00
BAHAN
Kanstin 40 x 14 x 28 cm Bh 2.5000 57,700.00 144,250.00
B Semen PC Zak 0.1200 94,500.00 11,340.00
Pasir Pasang M3 0.0080 279,300.00 2,234.40
JUMLAH HARGA BAHAN 157,824.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 206,430.40
E OVERHEAD & PROFIT ( 10% x D ) 20,643.04
F HARGA SATUAN PEKERJAAN ( D + E ) 227,073.44
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.5.1 ANALISA HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


A.4.5.1.1 Pemasangan 1 M2 Langit-langit Tripleks ukuran 120 x 240 Cm, 4 mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 26,803.00
BAHAN
Tripleks Lbr 0.3750 84,000.00 31,500.00
B
Paku Tripleks Kg 0.0300 21,000.00 630.00
JUMLAH HARGA BAHAN 32,130.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 58,933.00
E OVERHEAD & PROFIT ( 10% x D ) 5,893.30
F HARGA SATUAN PEKERJAAN ( D + E ) 64,826.30

A.4.5.1.2 Pemasangan 1 M2 Langit-langit Lambrisering Kayu, Tebal 9 mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang Kayu L.02 OH 0.8000 145,000.00 116,000.00
A
Kepala Tukang L.03 OH 0.0800 170,000.00 13,600.00
Mandor L.04 OH 0.0400 120,600.00 4,824.00
JUMLAH TENAGA KERJA 214,424.00
BAHAN
Kayu Papan M3 0.0150 2,310,000.00 34,650.00
B
Paku Tripleks Kg 0.0100 21,000.00 210.00
JUMLAH HARGA BAHAN 34,860.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 249,284.00
E OVERHEAD & PROFIT ( 10% x D ) 24,928.40
F HARGA SATUAN PEKERJAAN ( D + E ) 274,212.40
A.4.5.1.3 Pemasangan 1 M2 Langit-langit Gypsum Board ukuran (120 x 240 x 9) mm
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 18,703.00
BAHAN
Gysum Board Lembar 0.3640 98,100.00 35,708.40
B
Paku Skrup Kg 0.1100 26,200.00 2,882.00
JUMLAH HARGA BAHAN 38,590.40
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 57,293.40
E OVERHEAD & PROFIT ( 10% x D ) 5,729.34
F HARGA SATUAN PEKERJAAN ( D + E ) 63,022.74

A.4.5.1.4 Pemasangan 1 M2 Langit-langit GRC Board ukuran (120 x 240 x 6) mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 18,703.00
BAHAN
GRC Board Lembar 0.3640 120,700.00 43,934.80
B
Paku Skrup Kg 0.1100 26,200.00 2,882.00
JUMLAH HARGA BAHAN 46,816.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 65,519.80
E OVERHEAD & PROFIT ( 10% x D ) 6,551.98
F HARGA SATUAN PEKERJAAN ( D + E ) 72,071.78

A.4.5.1.5 Pemasangan 1 M2 Langit-langit Tripleks ukuran (120 x 240 x 4) mm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 18,703.00
BAHAN
Tripleks 4 mm Lembar 0.3640 84,000.00 30,576.00
B
Paku Skrup Kg 0.1100 26,200.00 2,882.00
JUMLAH HARGA BAHAN 33,458.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 52,161.00
E OVERHEAD & PROFIT ( 10% x D ) 5,216.10
F HARGA SATUAN PEKERJAAN ( D + E ) 57,377.10

A.4.5.1.6 Pemasangan 1 M2 Langit-langit PVC 20 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.2500 145,000.00 36,250.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0750 120,600.00 9,045.00
JUMLAH TENAGA KERJA 64,545.00
BAHAN
Plafond PVC M2 1.0500 27,300.00 28,665.00
B
Screw Bh 18.0000 300.00 5,400.00
JUMLAH HARGA BAHAN 34,065.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 98,610.00
E OVERHEAD & PROFIT ( 10% x D ) 9,861.00
F HARGA SATUAN PEKERJAAN ( D + E ) 108,471.00

A.4.5.1.7 Pemasangan 1 M1 List Langit-langit Kayu Profil, Lebar 10 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 13,461.80
BAHAN
List Kayu Profil 10 Cm M 1.0500 14,350.00 15,067.50
B
Paku Kg 0.0100 42,000.00 420.00
JUMLAH HARGA BAHAN 15,487.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 28,949.30
E OVERHEAD & PROFIT ( 10% x D ) 2,894.93
F HARGA SATUAN PEKERJAAN ( D + E ) 31,844.23

A.4.5.1.8 Pemasangan 1 M1 List Langit-langit Gypsum


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0500 100,000.00 5,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 13,461.80
BAHAN
List Profil Gypsum M 1.0500 15,700.00 16,485.00
B
Paku Kg 0.1500 17,300.00 2,595.00
JUMLAH HARGA BAHAN 19,080.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 32,541.80
E OVERHEAD & PROFIT ( 10% x D ) 3,254.18
F HARGA SATUAN PEKERJAAN ( D + E ) 35,795.98

A.4.5.1.9 Pemasangan 1 M1 List Langit-langit PVC


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 18,703.00
BAHAN
List PVC M 1.0500 16,800.00 17,640.00
B
Screw Bh 6.0000 300.00 1,800.00
JUMLAH HARGA BAHAN 19,440.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 38,143.00
E OVERHEAD & PROFIT ( 10% x D ) 3,814.30
F HARGA SATUAN PEKERJAAN ( D + E ) 41,957.30
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.5.2 ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


A.4.5.2.1 Pemasangan 1 M2 Genteng Metal
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0010 120,600.00 120.60
JUMLAH TENAGA KERJA 36,320.60
BAHAN
Genteng Metal Sakura Roof Lbr 1.0200 47,200.00 48,144.00
B
Paku Biasa 1/2" - 1" Kg 0.2000 25,200.00 5,040.00
JUMLAH HARGA BAHAN 53,184.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 89,504.60
E OVERHEAD & PROFIT ( 10% x D ) 8,950.46
F HARGA SATUAN PEKERJAAN ( D + E ) 98,455.06

A.4.5.2.2 Pemasangan 1 M2 Atap Sirap Kayu


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1660 100,000.00 16,600.00
Tukang Kayu L.02 OH 0.2500 145,000.00 36,250.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 58,064.80
BAHAN
Sirap Kayu Bh 30.0000 8,400.00 252,000.00
B
Paku Biasa 1/2" - 1" Kg 0.2000 25,200.00 5,040.00
JUMLAH HARGA BAHAN 257,040.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 315,104.80
E OVERHEAD & PROFIT ( 10% x D ) 31,510.48
F HARGA SATUAN PEKERJAAN ( D + E ) 346,615.28
A.4.5.2.3 Pemasangan 1 M1 Nok Genteng Metal
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 50,867.80
BAHAN
Nok Genteng Metal Bh 1.1000 26,200.00 28,820.00
B
Paku Biasa 1/2" - 1" Kg 0.0500 25,200.00 1,260.00
JUMLAH HARGA BAHAN 30,080.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 80,947.80
E OVERHEAD & PROFIT ( 10% x D ) 8,094.78
F HARGA SATUAN PEKERJAAN ( D + E ) 89,042.58

A.4.5.2.4 Pemasangan 1 M1 Nok Sirap


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1250 100,000.00 12,500.00
Tukang Kayu L.02 OH 0.2500 145,000.00 36,250.00
A
Kepala Tukang L.03 OH 0.0250 170,000.00 4,250.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 53,723.60
BAHAN
Seng Plat 3 x 6" Lbr 0.4000 68,200.00 27,280.00
B Paku Biasa 1/2" - 1" Kg 0.0500 25,200.00 1,260.00
Paku Biasa 2" - 5" Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 30,640.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 84,363.60
E OVERHEAD & PROFIT ( 10% x D ) 8,436.36
F HARGA SATUAN PEKERJAAN ( D + E ) 92,799.96

A.4.5.2.5 Pemasangan 1 M2 Atap Seng Gelombang BJLS 0.20


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 22,443.60
BAHAN
Seng Gelombang BJLS 0.20 Lbr 0.7000 54,600.00 38,220.00
B
Paku Biasa 1/2" - 1" Kg 0.0200 25,200.00 504.00
JUMLAH HARGA BAHAN 38,724.00

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 61,167.60
E OVERHEAD & PROFIT ( 10% x D ) 6,116.76
F HARGA SATUAN PEKERJAAN ( D + E ) 67,284.36

A.4.5.2.6 Pemasangan 1 M2 Atap Spandek Zincalume 0.4 mm berpasir


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 22,443.60
BAHAN
Atap Spandek 0.4 mm pasir Lbr 0.7000 131,200.00 91,840.00
B
Paku Biasa 1/2" - 1" Kg 0.0200 25,200.00 504.00
JUMLAH HARGA BAHAN 92,344.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 114,787.60
E OVERHEAD & PROFIT ( 10% x D ) 11,478.76
F HARGA SATUAN PEKERJAAN ( D + E ) 126,266.36

A.4.5.2.7 Pemasangan 1 M2 Atap Alderon


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 22,443.60
BAHAN
Atap Alderon R830 Bluedoff Lbr 0.9000 201,600.00 181,440.00
B
Paku Biasa 1/2" - 1" Bh 9.0000 1,900.00 17,100.00
JUMLAH HARGA BAHAN 198,540.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 220,983.60
E OVERHEAD & PROFIT ( 10% x D ) 22,098.36
F HARGA SATUAN PEKERJAAN ( D + E ) 243,081.96

A.4.5.2.7 Pemasangan 1 M1 Nok Atap Zincalume Berpasir


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2500 100,000.00 25,000.00
Tukang Kayu L.02 OH 0.1500 145,000.00 21,750.00
A
Kepala Tukang L.03 OH 0.0150 170,000.00 2,550.00
Mandor L.04 OH 0.0130 120,600.00 1,567.80
JUMLAH TENAGA KERJA 50,867.80

BAHAN
Nok Zincalume Berpasir Bh 1.1000 46,200.00 50,820.00
B
Paku Biasa 1/2" - 1" Kg 0.0500 25,200.00 1,260.00
JUMLAH HARGA BAHAN 52,080.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 102,947.80
E OVERHEAD & PROFIT ( 10% x D ) 10,294.78
F HARGA SATUAN PEKERJAAN ( D + E ) 113,242.58

A.4.5.2.8 Pemasangan 1 M2 Allumunium Foil / Sisalation


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.0500 145,000.00 7,250.00
A
Kepala Tukang L.03 OH 0.0050 170,000.00 850.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 24,064.80
BAHAN
B Alumunium Foil M2 1.0500 42,000.00 44,100.00
JUMLAH HARGA BAHAN 44,100.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 68,164.80
E OVERHEAD & PROFIT ( 10% x D ) 6,816.48
F HARGA SATUAN PEKERJAAN ( D + E ) 74,981.28
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.6.1 ANALISA HARGA SATUAN PEKERJAAN KAYU


A.4.6.1.1 Pembuatan dan Pemasangan 1 M3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 7.0000 100,000.00 700,000.00
Tukang Kayu L.02 OH 21.0000 145,000.00 3,045,000.00
A
Kepala Tukang L.03 OH 2.1000 170,000.00 357,000.00
Mandor L.04 OH 0.3500 120,600.00 42,210.00
JUMLAH TENAGA KERJA 4,144,210.00
BAHAN
Balok Kayu M3 1.1000 5,040,000.00 5,544,000.00
B Paku 10 Cm Kg 1.2500 42,000.00 52,500.00
Lem Kayu Kg 1.0000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 5,617,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 9,761,710.00
E OVERHEAD & PROFIT ( 10% x D ) 976,171.00
F HARGA SATUAN PEKERJAAN ( D + E ) 10,737,881.00

A.4.6.1.2 Pembuatan dan Pemasangan 1 M3 Kusen Pintu dan Kusen Jendela, Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 6.0000 100,000.00 600,000.00
Tukang Kayu L.02 OH 18.0000 145,000.00 2,610,000.00
A
Kepala Tukang L.03 OH 1.8000 170,000.00 306,000.00
Mandor L.04 OH 0.3000 120,600.00 36,180.00
JUMLAH TENAGA KERJA 3,552,180.00
BAHAN
Balok Kayu M3 1.2000 2,310,000.00 2,772,000.00
B Paku 10 Cm Kg 1.2500 42,000.00 52,500.00
Lem Kayu Kg 1.0000 21,000.00 21,000.00
JUMLAH HARGA BAHAN 2,845,500.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 6,397,680.00
E OVERHEAD & PROFIT ( 10% x D ) 639,768.00
F HARGA SATUAN PEKERJAAN ( D + E ) 7,037,448.00
A.4.6.1.3 Pembuatan dan Pemasangan 1 M2 Daun Pintu Panil, Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 145,000.00 435,000.00
A
Kepala Tukang L.03 OH 0.3000 170,000.00 51,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 592,030.00
BAHAN
Papan Kayu M3 0.0400 5,040,000.00 201,600.00
B
Lem Kayu Kg 0.5000 21,000.00 10,500.00
JUMLAH HARGA BAHAN 212,100.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 804,130.00
E OVERHEAD & PROFIT ( 10% x D ) 80,413.00
F HARGA SATUAN PEKERJAAN ( D + E ) 884,543.00

A.4.6.1.4 Pembuatan dan Pemasangan 1 M2 Daun Pintu Panil, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 145,000.00 435,000.00
A
Kepala Tukang L.03 OH 0.3000 170,000.00 51,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 592,030.00
BAHAN
Papan Kayu M3 0.0400 2,310,000.00 92,400.00
B
Lem Kayu Kg 0.5000 21,000.00 10,500.00
JUMLAH HARGA BAHAN 102,900.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 694,930.00
E OVERHEAD & PROFIT ( 10% x D ) 69,493.00
F HARGA SATUAN PEKERJAAN ( D + E ) 764,423.00

A.4.6.1.5 Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca, Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.4000 145,000.00 348,000.00
A
Kepala Tukang L.03 OH 0.2400 170,000.00 40,800.00
Mandor L.04 OH 0.0400 120,600.00 4,824.00
JUMLAH TENAGA KERJA 473,624.00
BAHAN
Papan Kayu M3 0.0240 5,040,000.00 120,960.00
B
Lem Kayu Kg 0.3000 21,000.00 6,300.00
JUMLAH HARGA BAHAN 127,260.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 600,884.00
E OVERHEAD & PROFIT ( 10% x D ) 60,088.40
F HARGA SATUAN PEKERJAAN ( D + E ) 660,972.40

A.4.6.1.6 Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Kaca, Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.8000 100,000.00 80,000.00
Tukang Kayu L.02 OH 2.4000 145,000.00 348,000.00
A
Kepala Tukang L.03 OH 0.2400 170,000.00 40,800.00
Mandor L.04 OH 0.0400 120,600.00 4,824.00
JUMLAH TENAGA KERJA 473,624.00
BAHAN
Papan Kayu M3 0.0240 2,310,000.00 55,440.00
B
Lem Kayu Kg 0.3000 21,000.00 6,300.00
JUMLAH HARGA BAHAN 61,740.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 535,364.00
E OVERHEAD & PROFIT ( 10% x D ) 53,536.40
F HARGA SATUAN PEKERJAAN ( D + E ) 588,900.40

A.4.6.1.7 Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Jalusi Kayu Kelas I
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 145,000.00 435,000.00
A
Kepala Tukang L.03 OH 0.3000 170,000.00 51,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 592,030.00
BAHAN
Papan Kayu M3 0.0640 5,040,000.00 322,560.00
B
Lem Kayu Kg 0.5000 21,000.00 10,500.00
JUMLAH HARGA BAHAN 333,060.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 925,090.00
E OVERHEAD & PROFIT ( 10% x D ) 92,509.00
F HARGA SATUAN PEKERJAAN ( D + E ) 1,017,599.00

A.4.6.1.8 Pembuatan dan Pemasangan 1 M2 Pintu dan Jendela Jalusi Kayu Kelas II
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Kayu L.02 OH 3.0000 145,000.00 435,000.00
A
Kepala Tukang L.03 OH 0.3000 170,000.00 51,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 592,030.00
BAHAN
Papan Kayu M3 0.0640 2,310,000.00 147,840.00
B
Lem Kayu Kg 0.5000 21,000.00 10,500.00
JUMLAH HARGA BAHAN 158,340.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 750,370.00
E OVERHEAD & PROFIT ( 10% x D ) 75,037.00
F HARGA SATUAN PEKERJAAN ( D + E ) 825,407.00

A.4.6.1.9 Pembuatan 1 M2 Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup (Lebar Sampai 90 Cm)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.7000 100,000.00 70,000.00
Tukang Kayu L.02 OH 2.1000 145,000.00 304,500.00
A
Kepala Tukang L.03 OH 0.2100 170,000.00 35,700.00
Mandor L.04 OH 0.0350 120,600.00 4,221.00
JUMLAH TENAGA KERJA 414,421.00
BAHAN
Papan Kayu M3 0.0250 2,310,000.00 57,750.00
Paku 1 Cm - 2,5 Cm Kg 0.0300 42,000.00 1,260.00
B
Lem Kayu Kg 0.5000 21,000.00 10,500.00
Plywood Tebal 4 mm ukuran (90 x 220) Cm Lembar 1.0000 110,200.00 110,200.00
JUMLAH HARGA BAHAN 179,710.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 594,131.00
E OVERHEAD & PROFIT ( 10% x D ) 59,413.10
F HARGA SATUAN PEKERJAAN ( D + E ) 653,544.10

A.4.6.1.10 Pemasangan 1 M2 Jalusi Kusen, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.6700 100,000.00 67,000.00
Tukang Kayu L.02 OH 2.0000 145,000.00 290,000.00
A
Kepala Tukang L.03 OH 0.2000 170,000.00 34,000.00
Mandor L.04 OH 0.3350 120,600.00 40,401.00
JUMLAH TENAGA KERJA 431,401.00
BAHAN
Papan Kayu M3 0.0600 2,310,000.00 138,600.00
B
Paku 1 Cm - 2,5 Cm Kg 0.1500 42,000.00 6,300.00
JUMLAH HARGA BAHAN 144,900.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 576,301.00
E OVERHEAD & PROFIT ( 10% x D ) 57,630.10
F HARGA SATUAN PEKERJAAN ( D + E ) 633,931.10

A.4.6.1.11 Pemasangan 1 M3 Konstruksi Kuda-kuda Konvensional, Kayu Kelas II Bentang 6 Meter


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 4.0000 100,000.00 400,000.00
Tukang Kayu L.02 OH 12.0000 145,000.00 1,740,000.00
A
Kepala Tukang L.03 OH 1.2000 170,000.00 204,000.00
Mandor L.04 OH 0.2000 120,600.00 24,120.00
JUMLAH TENAGA KERJA 2,368,120.00
BAHAN
Balok Kayu M3 1.1000 2,310,000.00 2,541,000.00
B Besi Strip Tebal 5 mm Kg 15.0000 18,600.00 279,000.00
Paku 12 Cm Kg 5.6000 42,000.00 235,200.00
JUMLAH HARGA BAHAN 3,055,200.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 5,423,320.00
E OVERHEAD & PROFIT ( 10% x D ) 542,332.00
F HARGA SATUAN PEKERJAAN ( D + E ) 5,965,652.00

A.4.6.1.12 Pemasangan 1 M3 Konstruksi Gording, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 6.7000 100,000.00 670,000.00
Tukang Kayu L.02 OH 20.1000 145,000.00 2,914,500.00
A
Kepala Tukang L.03 OH 2.0100 170,000.00 341,700.00
Mandor L.04 OH 0.3350 120,600.00 40,401.00
JUMLAH TENAGA KERJA 3,966,601.00
BAHAN
Balok Kayu M3 1.1000 2,310,000.00 2,541,000.00
B Besi Strip Tebal 5 mm Kg 15.0000 18,600.00 279,000.00
Paku 12 Cm Kg 3.0000 42,000.00 126,000.00
JUMLAH HARGA BAHAN 2,946,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 6,912,601.00
E OVERHEAD & PROFIT ( 10% x D ) 691,260.10
F HARGA SATUAN PEKERJAAN ( D + E ) 7,603,861.10

A.4.6.1.13 Pemasangan 1 M2 Rangka Atap Genteng Keramik, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 26,803.00
BAHAN
Kaso-kaso 5/7 Cm M3 0.0140 2,310,000.00 32,340.00
B Reng 2/3 Cm M3 0.0360 2,310,000.00 83,160.00
Paku 5 dan 10 Cm Kg 0.2500 42,000.00 10,500.00
JUMLAH HARGA BAHAN 126,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 152,803.00
E OVERHEAD & PROFIT ( 10% x D ) 15,280.30
F HARGA SATUAN PEKERJAAN ( D + E ) 168,083.30

A.4.6.1.14 Pemasangan 1 M2 Rangka Atap Sirap, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 32,163.60

BAHAN
Kayu Kelas II M3 0.0140 2,310,000.00 32,340.00
B
Paku 5 - 10 Cm Kg 0.0570 42,000.00 2,394.00
JUMLAH HARGA BAHAN 34,734.00
PERALATAN
C
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 66,897.60
E OVERHEAD & PROFIT ( 10% x D ) 6,689.76
F HARGA SATUAN PEKERJAAN ( D + E ) 73,587.36

A.4.6.1.15 Pemasangan 1 M2 Rangka Langit-langit (50 x 100) Cm, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 32,163.60
BAHAN
Kaso-kaso 5 x 7 Cm M3 0.0154 2,310,000.00 35,574.00
B
Paku 7 Cm - 10 Cm Kg 0.2000 42,000.00 8,400.00
JUMLAH HARGA BAHAN 43,974.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 76,137.60
E OVERHEAD & PROFIT ( 10% x D ) 7,613.76
F HARGA SATUAN PEKERJAAN ( D + E ) 83,751.36

A.4.6.1.16 Pemasangan 1 M2 Rangka Langit-langit (60 x 60) Cm, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1200 100,000.00 12,000.00
Tukang Kayu L.02 OH 0.1200 145,000.00 17,400.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0060 120,600.00 723.60
JUMLAH TENAGA KERJA 32,163.60
BAHAN
Kaso-kaso 5 x 7 Cm M3 0.0163 2,310,000.00 37,653.00
B
Paku 7 Cm - 10 Cm Kg 0.2500 42,000.00 10,500.00
JUMLAH HARGA BAHAN 48,153.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 80,316.60
E OVERHEAD & PROFIT ( 10% x D ) 8,031.66
F HARGA SATUAN PEKERJAAN ( D + E ) 88,348.26

A.4.6.1.17 Pemasangan 1 M1 Listplank ukuran (3 x 20) Cm, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.2000 145,000.00 29,000.00
A
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 43,003.00
BAHAN
Papan Kayu M3 0.0108 2,310,000.00 24,948.00
B
Paku 5 Cm - 7 Cm Kg 0.1000 42,000.00 4,200.00
JUMLAH HARGA BAHAN 29,148.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 72,151.00
E OVERHEAD & PROFIT ( 10% x D ) 7,215.10
F HARGA SATUAN PEKERJAAN ( D + E ) 79,366.10

A.4.6.1.18 Pemasangan 1 M1 Listplank ukuran (3 x 30) Cm, Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1000 100,000.00 10,000.00
Tukang Kayu L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 43,003.00
BAHAN
Papan Kayu M3 0.0110 2,310,000.00 25,410.00
B
Paku 5 Cm - 7 Cm Kg 0.0500 42,000.00 2,100.00
JUMLAH HARGA BAHAN 27,510.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 70,513.00
E OVERHEAD & PROFIT ( 10% x D ) 7,051.30
F HARGA SATUAN PEKERJAAN ( D + E ) 77,564.30

A.4.6.1.19 Pemasangan 1 M2 Rangka Dinding Pemisah (60 x 120) Cm Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
Tukang Kayu L.02 OH 0.4500 145,000.00 65,250.00
A
Kepala Tukang L.03 OH 0.0450 170,000.00 7,650.00
Mandor L.04 OH 0.0080 120,600.00 964.80
JUMLAH TENAGA KERJA 88,864.80
BAHAN
Balok Kayu M3 0.0280 2,310,000.00 64,680.00
B
Paku 5 Cm - 7 Cm Kg 0.1500 42,000.00 6,300.00
JUMLAH HARGA BAHAN 70,980.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 159,844.80
E OVERHEAD & PROFIT ( 10% x D ) 15,984.48
F HARGA SATUAN PEKERJAAN ( D + E ) 175,829.28

A.4.6.1.20 Pemasangan 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 118,406.00
BAHAN
Balok Kayu 6/12 M3 0.0280 2,310,000.00 64,680.00
Paku 5 Cm dan 10 Cm Kg 0.1500 42,000.00 6,300.00
B
Plywood 4 mm, 120 x 240 Cm Lembar 0.8600 110,200.00 94,772.00
Lem Kayu Kg 0.5600 21,000.00 11,760.00
JUMLAH HARGA BAHAN 177,512.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 295,918.00
E OVERHEAD & PROFIT ( 10% x D ) 29,591.80
F HARGA SATUAN PEKERJAAN ( D + E ) 325,509.80

A.4.6.1.21 Pemasangan 1 M2 Dinding Lambrisering dari Papan Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2000 100,000.00 20,000.00
Tukang Kayu L.02 OH 0.6000 145,000.00 87,000.00
A
Kepala Tukang L.03 OH 0.0600 170,000.00 10,200.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 118,406.00
BAHAN
Papan Kayu M3 0.0070 2,310,000.00 16,170.00
B Paku 5 Cm dan 10 Cm Kg 0.1000 42,000.00 4,200.00
Paku Skrup 10 Cm Kg 0.1500 26,200.00 3,930.00
JUMLAH HARGA BAHAN 24,300.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 142,706.00
E OVERHEAD & PROFIT ( 10% x D ) 14,270.60
F HARGA SATUAN PEKERJAAN ( D + E ) 156,976.60

A.4.6.1.22 Pemasangan 1 M2 Panil Multipleks Lapis HPL Taco


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.2800 100,000.00 28,000.00
Tukang Kayu L.02 OH 0.8500 145,000.00 123,250.00
A
Kepala Tukang L.03 OH 0.0900 170,000.00 15,300.00
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 167,756.00

BAHAN
Multiplek 12 mm Lbr 0.4000 163,100.00 65,240.00
B HPL Taco Solid Color Lbr 0.4000 189,000.00 75,600.00
Lem Kayu Kg 0.5000 21,000.00 10,500.00
JUMLAH HARGA BAHAN 151,340.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 319,096.00
E OVERHEAD & PROFIT ( 10% x D ) 31,909.60
F HARGA SATUAN PEKERJAAN ( D + E ) 351,005.60

A.4.6.1.23 Pemasangan 1 M3 Konstruksi Kolom dan Balok Konvensional Kayu Kelas II


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 2.5000 100,000.00 250,000.00
Tukang Kayu L.02 OH 8.0000 145,000.00 1,160,000.00
A
Kepala Tukang L.03 OH 1.0000 170,000.00 170,000.00
Mandor L.04 OH 0.2000 120,600.00 24,120.00
JUMLAH TENAGA KERJA 1,604,120.00
BAHAN
Balok Kayu Kelas II M3 1.1000 2,310,000.00 2,541,000.00
B Besi Strip Tebal 5 mm Kg 5.0000 18,600.00 93,000.00
Paku 5 - 12 Cm Kg 2.8000 42,000.00 117,600.00
JUMLAH HARGA BAHAN 2,751,600.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 4,355,720.00
E OVERHEAD & PROFIT ( 10% x D ) 435,572.00
F HARGA SATUAN PEKERJAAN ( D + E ) 4,791,292.00
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.4.7.1 ANALISA HARGA SATUAN PEKERJAAN PENGECATAN


A.4.7.1.1 Pengikisan / Pengerokan Permukaan Cat Lama
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
A
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 15,361.80
BAHAN
B Soda Api Kg 0.0500 26,200.00 1,310.00
JUMLAH HARGA BAHAN 1,310.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 16,671.80
E OVERHEAD & PROFIT ( 10% x D ) 1,667.18
F HARGA SATUAN PEKERJAAN ( D + E ) 18,338.98

A.4.7.1.2 Pencucian 1 M2 Bidang Permukaan Tembok yang Pernah di Cat


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.1500 100,000.00 15,000.00
A
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 15,361.80
BAHAN
B Sabun Kg 0.0500 25,000.00 1,250.00
JUMLAH HARGA BAHAN 1,250.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 16,611.80
E OVERHEAD & PROFIT ( 10% x D ) 1,661.18
F HARGA SATUAN PEKERJAAN ( D + E ) 18,272.98

A.4.7.1.3 Pengecatan 1 M2 Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat L.02 OH 0.0090 145,000.00 1,305.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 9,686.80
BAHAN
Cat Menie Kg 0.2000 59,800.00 11,960.00
Plamuur Kg 0.1500 36,700.00 5,505.00
Cat Dasar Kg 0.1700 58,800.00 9,996.00
B Cat Penutup Kg 0.2600 58,800.00 15,288.00
Kuas Bh 0.0100 15,700.00 157.00
Pengencer Kg 0.0300 26,200.00 786.00
Ampelas Lbr 0.2000 5,200.00 1,040.00
JUMLAH HARGA BAHAN 44,732.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 54,418.80
E OVERHEAD & PROFIT ( 10% x D ) 5,441.88
F HARGA SATUAN PEKERJAAN ( D + E ) 59,860.68

A.4.7.1.4 Pengecatan 1 M2 Bidang Kayu Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0700 100,000.00 7,000.00
Tukang Cat L.02 OH 0.1050 145,000.00 15,225.00
A
Kepala Tukang L.03 OH 0.0040 170,000.00 680.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 23,266.80
BAHAN
Cat Menie Kg 0.2000 59,800.00 11,960.00
Plamuur Kg 0.1500 36,700.00 5,505.00
Cat Dasar Kg 0.1700 58,800.00 9,996.00
B Cat Penutup Kg 0.3500 58,800.00 20,580.00
Kuas Bh 0.0100 15,700.00 157.00
Pengencer Kg 0.0300 26,200.00 786.00
Ampelas Lbr 0.2000 5,200.00 1,040.00
JUMLAH HARGA BAHAN 50,024.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 73,290.80
E OVERHEAD & PROFIT ( 10% x D ) 7,329.08
F HARGA SATUAN PEKERJAAN ( D + E ) 80,619.88

A.4.7.1.5 Pelaburan 1 M2 Bidang Kayu dengan Politur


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
Tukang Cat L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0160 170,000.00 2,720.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 15,781.80
BAHAN
Politur Ltr 0.1500 60,900.00 9,135.00
B Politur Jadi Ltr 0.3720 60,900.00 22,654.80
Ampelas Lbr 2.0000 5,200.00 10,400.00
JUMLAH HARGA BAHAN 42,189.80

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 57,971.60
E OVERHEAD & PROFIT ( 10% x D ) 5,797.16
F HARGA SATUAN PEKERJAAN ( D + E ) 63,768.76

A.4.7.1.6 Pelaburan 1 M2 Bidang Kayu dengan Vernis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
Tukang Cat L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0160 170,000.00 2,720.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 15,781.80
BAHAN
Vernis Ltr 0.1500 60,900.00 9,135.00
B Dempul Kg 0.0500 36,700.00 1,835.00
Ampelas Lbr 0.1000 5,200.00 520.00
JUMLAH HARGA BAHAN 11,490.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 27,271.80
E OVERHEAD & PROFIT ( 10% x D ) 2,727.18
F HARGA SATUAN PEKERJAAN ( D + E ) 29,998.98

A.4.7.1.7 Pengecatan 1 M2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 145,000.00 9,135.00
A
Kepala Tukang L.03 OH 0.0063 170,000.00 1,071.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 12,567.80
BAHAN
Plamuur Kg 0.1000 15,700.00 1,570.00
B Cat Dasar 1 Kali (setara Nippon Vinilex) Kg 0.1000 42,000.00 4,200.00
Cat Penutup 2 Kali (setara Nipon Vinilex) Kg 0.2600 42,000.00 10,920.00
JUMLAH HARGA BAHAN 16,690.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 29,257.80
E OVERHEAD & PROFIT ( 10% x D ) 2,925.78
F HARGA SATUAN PEKERJAAN ( D + E ) 32,183.58

A.4.7.1.8 Pengecatan 1 M2 Tembok Baru (1 Lapis Plamuur, 1 Lapis Cat Dasar Metrolite, 2 Lapis Cat Penutup Metrolite)
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 145,000.00 9,135.00
A
Kepala Tukang L.03 OH 0.0063 170,000.00 1,071.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 12,567.80

BAHAN
Plamuur Kg 0.1000 15,700.00 1,570.00
B Cat Dasar Metrolite 1 Kali Kg 0.1000 28,350.00 2,835.00
Cat Penutup Metrolite 2 Kali Kg 0.2600 28,350.00 7,371.00
B

JUMLAH HARGA BAHAN 11,776.00


PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 24,343.80
E OVERHEAD & PROFIT ( 10% x D ) 2,434.38
F HARGA SATUAN PEKERJAAN ( D + E ) 26,778.18

A.4.7.1.9 Pengecatan 1 M2 Tembok (1 Lapis Cat Dasar, 2 Lapis Cat Penutup)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0280 100,000.00 2,800.00
Tukang Cat L.02 OH 0.0420 145,000.00 6,090.00
A
Kepala Tukang L.03 OH 0.0042 170,000.00 714.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 9,965.80
BAHAN
Cat Dasar Metrolite Kg 0.1200 28,350.00 3,402.00
B
Cat Penutup Metrolite Kg 0.1800 28,350.00 5,103.00
JUMLAH HARGA BAHAN 8,505.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 18,470.80
E OVERHEAD & PROFIT ( 10% x D ) 1,847.08
F HARGA SATUAN PEKERJAAN ( D + E ) 20,317.88

A.4.7.1.10 Pemasangan 1 M2 Wallpaper


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.2000 145,000.00 29,000.00
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 34,701.50
BAHAN
Wallpaper M2 1.2000 84,000.00 100,800.00
B
Lem Kg 0.2000 15,700.00 3,140.00
JUMLAH HARGA BAHAN 103,940.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 138,641.50
E OVERHEAD & PROFIT ( 10% x D ) 13,864.15
F HARGA SATUAN PEKERJAAN ( D + E ) 152,505.65

A.4.7.1.11 Pengecatan 1 M2 Permukaan Baja dengan Menie Besi


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.2000 145,000.00 29,000.00
A
A
Kepala Tukang L.03 OH 0.0200 170,000.00 3,400.00
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 34,701.50
BAHAN
Menie Besi Kg 0.1000 39,900.00 3,990.00
B
Kuas Bh 0.0100 15,700.00 157.00
JUMLAH HARGA BAHAN 4,147.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 38,848.50
E OVERHEAD & PROFIT ( 10% x D ) 3,884.85
F HARGA SATUAN PEKERJAAN ( D + E ) 42,733.35

A.4.7.1.12 Pengecatan 1 M2 Permukaan Baja Galvanis secara Manual Sistem 1 Lapis Cat Mutakhir
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0600 100,000.00 6,000.00
Tukang Cat L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0120 170,000.00 2,040.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 17,101.80
BAHAN
Cat Kg 0.3000 59,800.00 17,940.00
B Kuas Bh 0.0100 15,700.00 157.00
Pengencer Ltr 0.0100 26,200.00 262.00
JUMLAH HARGA BAHAN 18,359.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 35,460.80
E OVERHEAD & PROFIT ( 10% x D ) 3,546.08
F HARGA SATUAN PEKERJAAN ( D + E ) 39,006.88

A.4.7.1.13 Pengecatan 1 M2 dengan Waterproofing 2 Lapis


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang Cat L.02 OH 0.0630 145,000.00 9,135.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 12,516.80
BAHAN
B Waterproofing Kg 2.0000 61,900.00 123,800.00
JUMLAH HARGA BAHAN 123,800.00

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 136,316.80
E OVERHEAD & PROFIT ( 10% x D ) 13,631.68
F HARGA SATUAN PEKERJAAN ( D + E ) 149,948.48

A.4.7.1.14 Melapis 1 M2 Serat Fiber (Polyester)


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0125 100,000.00 1,250.00
Tukang Cat L.02 OH 0.0415 145,000.00 6,017.50
A
Kepala Tukang L.03 OH 0.0042 170,000.00 714.00
Mandor L.04 OH 0.0013 120,600.00 156.78
JUMLAH TENAGA KERJA 8,138.28
BAHAN
B Serat Fiber Lbr 0.3050 45,100.00 13,755.50
JUMLAH HARGA BAHAN 13,755.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 21,893.78
E OVERHEAD & PROFIT ( 10% x D ) 2,189.38
F HARGA SATUAN PEKERJAAN ( D + E ) 24,083.16
0.03
0.08
0.01
0.00
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.5.1.1 ANALISA HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


A.5.1.1.1 Pemasangan 1 Buah Closet Duduk Incl. Jet Spray Toto CW421J
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 3.3000 100,000.00 330,000.00
Tukang Batu L.02 OH 1.1000 145,000.00 159,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.1600 120,600.00 19,296.00
JUMLAH TENAGA KERJA 510,496.00
BAHAN
Closet Duduk + Jet Spray Toto CW421J Unit 1.0000 2,782,500.00 2,782,500.00
B
Perlengkapan % 6.0000 2,782,500.00 166,950.00
JUMLAH HARGA BAHAN 2,949,450.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 3,459,946.00
E OVERHEAD & PROFIT ( 10% x D ) 345,994.60
F HARGA SATUAN PEKERJAAN ( D + E ) 3,805,940.60

A.5.1.1.2 Pemasangan 1 Buah Closet Jongkok Porselen


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Batu L.02 OH 1.5000 145,000.00 217,500.00
A
Kepala Tukang L.03 OH 0.1500 170,000.00 25,500.00
Mandor L.04 OH 0.1600 120,600.00 19,296.00
JUMLAH TENAGA KERJA 362,296.00
BAHAN
Closet Jongkok Unit 1.0000 577,500.00 577,500.00
B Semen Portland Kg 6.0000 1,890.00 11,340.00
Pasir Pasang M3 0.0100 279,300.00 2,793.00
JUMLAH HARGA BAHAN 591,633.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 953,929.00
E OVERHEAD & PROFIT ( 10% x D ) 95,392.90
F HARGA SATUAN PEKERJAAN ( D + E ) 1,049,321.90
A.5.1.1.3 Pemasangan 1 Buah Urinoir Standar
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 100,000.00 100,000.00
Tukang Batu L.02 OH 1.0000 145,000.00 145,000.00
A
Kepala Tukang L.03 OH 0.1000 170,000.00 17,000.00
Mandor L.04 OH 0.0500 120,600.00 6,030.00
JUMLAH TENAGA KERJA 268,030.00
BAHAN
Urinoir Unit 1.0000 2,625,000.00 2,625,000.00
Semen Portland Kg 6.0000 1,890.00 11,340.00
B
Pasir Pasang M3 0.0100 279,300.00 2,793.00
Perlengkapan % 30.0000 2,625,000.00 787,500.00
JUMLAH HARGA BAHAN 3,426,633.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 3,694,663.00
E OVERHEAD & PROFIT ( 10% x D ) 369,466.30
F HARGA SATUAN PEKERJAAN ( D + E ) 4,064,129.30

A.5.1.1.4 Pemasangan 1 Buah Wastafel Toto LW246J Komplit


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.2000 100,000.00 120,000.00
Tukang Batu L.02 OH 1.4500 145,000.00 210,250.00
A
Kepala Tukang L.03 OH 0.1500 170,000.00 25,500.00
Mandor L.04 OH 0.0600 120,600.00 7,236.00
JUMLAH TENAGA KERJA 362,986.00
BAHAN
Wastafel Unit 1.2000 1,890,000.00 2,268,000.00
Semen Portland Kg 6.0000 1,890.00 11,340.00
B
Pasir Pasang M3 0.0100 279,300.00 2,793.00
Perlengkapan % 12.0000 1,890,000.00 226,800.00
JUMLAH HARGA BAHAN 2,508,933.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 2,871,919.00
E OVERHEAD & PROFIT ( 10% x D ) 287,191.90
F HARGA SATUAN PEKERJAAN ( D + E ) 3,159,110.90

A.5.1.1.5 Pemasangan 1 Buah Bak Cuci Piring Stainless Steel


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0300 100,000.00 3,000.00
Tukang Batu L.02 OH 0.3000 145,000.00 43,500.00
A
Kepala Tukang L.03 OH 0.0300 170,000.00 5,100.00
Mandor L.04 OH 0.0150 120,600.00 1,809.00
JUMLAH TENAGA KERJA 53,409.00
BAHAN
Bak Cuci Piring Unit 1.0000 1,155,000.00 1,155,000.00
B
Waterdrain Buah 1.0000 15,000.00 15,000.00
JUMLAH HARGA BAHAN 1,170,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,223,409.00
E OVERHEAD & PROFIT ( 10% x D ) 122,340.90
F HARGA SATUAN PEKERJAAN ( D + E ) 1,345,749.90

A.5.1.1.6 Pemasangan 1 Buah Floor Drain Stainless Onda FLS 05


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 17,803.00
BAHAN
B Floor Drain Stainless Unit 1.0000 173,200.00 173,200.00
JUMLAH HARGA BAHAN 173,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 191,003.00
E OVERHEAD & PROFIT ( 10% x D ) 19,100.30
F HARGA SATUAN PEKERJAAN ( D + E ) 210,103.30

A.5.1.1.7 Pemasangan 1 M1 Pipa Galvanis Diameter 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0270 120,600.00 3,256.20
JUMLAH TENAGA KERJA 23,236.20
BAHAN
Pipa Galvanis 1/2" M 1.2000 51,450.00 61,740.00
B
Perlengkapan % 35.0000 51,450.00 18,007.50
JUMLAH HARGA BAHAN 79,747.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 102,983.70
E OVERHEAD & PROFIT ( 10% x D ) 10,298.37
F HARGA SATUAN PEKERJAAN ( D + E ) 113,282.07

A.5.1.1.8 Pemasangan 1 Buah Kran Diameter 1/2" atau 3/4" Toto T23B13
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Batu L.02 OH 0.4000 145,000.00 58,000.00
A
Kepala Tukang L.03 OH 0.0400 170,000.00 6,800.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 66,403.00
BAHAN
Kran Air Buah 1.0000 210,000.00 210,000.00
B
Sealtape M 0.0250 5,200.00 130.00
JUMLAH HARGA BAHAN 210,130.00

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 276,533.00
E OVERHEAD & PROFIT ( 10% x D ) 27,653.30
F HARGA SATUAN PEKERJAAN ( D + E ) 304,186.30

A.5.1.1.9 Pemasangan 1 M1 Pipa PVC Tipe AW Diameter 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0360 100,000.00 3,600.00
Tukang Batu L.02 OH 0.0600 145,000.00 8,700.00
A
Kepala Tukang L.03 OH 0.0060 170,000.00 1,020.00
Mandor L.04 OH 0.0020 120,600.00 241.20
JUMLAH TENAGA KERJA 13,561.20
BAHAN
Pipa PVC 1/2" M 1.2000 11,750.00 14,100.00
B
Perlengkapan % 35.0000 11,750.00 4,112.50
JUMLAH HARGA BAHAN 18,212.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 31,773.70
E OVERHEAD & PROFIT ( 10% x D ) 3,177.37
F HARGA SATUAN PEKERJAAN ( D + E ) 34,951.07

A.5.1.1.10 Pemasangan 1 M1 Pipa PVC Tipe AW Diameter 2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0030 120,600.00 361.80
JUMLAH TENAGA KERJA 20,341.80
BAHAN
Pipa PVC 2" M 1.2000 26,450.00 31,740.00
B
Perlengkapan % 35.0000 26,450.00 9,257.50
JUMLAH HARGA BAHAN 40,997.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 61,339.30
E OVERHEAD & PROFIT ( 10% x D ) 6,133.93
F HARGA SATUAN PEKERJAAN ( D + E ) 67,473.23

A.5.1.1.11 Pemasangan 1 M1 Pipa PVC Tipe AW Diameter 3"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0810 100,000.00 8,100.00
Tukang Batu L.02 OH 0.1350 145,000.00 19,575.00
A
Kepala Tukang L.03 OH 0.0135 170,000.00 2,295.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 30,452.40

BAHAN
Pipa PVC 3" M 1.2000 51,750.00 62,100.00
B
Perlengkapan % 35.0000 51,750.00 18,112.50
B

JUMLAH HARGA BAHAN 80,212.50


PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 110,664.90
E OVERHEAD & PROFIT ( 10% x D ) 11,066.49
F HARGA SATUAN PEKERJAAN ( D + E ) 121,731.39

A.5.1.1.12 Pemasangan 1 M1 Pipa ASTM B819


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0270 120,600.00 3,256.20
JUMLAH TENAGA KERJA 23,236.20
BAHAN
Pipa Galvanis B819 M 1.2000 64,909.09 77,890.91
B
Perlengkapan % 35.0000 64,909.09 22,718.18
JUMLAH HARGA BAHAN 100,609.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 123,845.29
E OVERHEAD & PROFIT ( 10% x D ) 12,384.53
F HARGA SATUAN PEKERJAAN ( D + E ) 136,229.82

A.5.1.1.13 Pemasangan 1 M1 Pipa PPR 1/2"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0270 120,600.00 3,256.20
JUMLAH TENAGA KERJA 23,236.20
BAHAN
Pipa PPR 1/2" M 1.2000 12,600.00 15,120.00
B
Perlengkapan % 35.0000 12,600.00 4,410.00
JUMLAH HARGA BAHAN 19,530.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 42,766.20
E OVERHEAD & PROFIT ( 10% x D ) 4,276.62
F HARGA SATUAN PEKERJAAN ( D + E ) 47,042.82

A.5.1.1.14 Pemasangan 1 M1 Pipa HDPE 3/4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00

A
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0270 120,600.00 3,256.20
JUMLAH TENAGA KERJA 23,236.20
BAHAN
Pipa HDPE 3/4" M 1.2000 157,500.00 189,000.00
B
Perlengkapan % 35.0000 157,500.00 55,125.00
JUMLAH HARGA BAHAN 244,125.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 267,361.20
E OVERHEAD & PROFIT ( 10% x D ) 26,736.12
F HARGA SATUAN PEKERJAAN ( D + E ) 294,097.32

A.5.1.1.15 Pemasangan 1 M1 Pipa C 8"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0540 100,000.00 5,400.00
Tukang Batu L.02 OH 0.0900 145,000.00 13,050.00
A
Kepala Tukang L.03 OH 0.0090 170,000.00 1,530.00
Mandor L.04 OH 0.0270 120,600.00 3,256.20
JUMLAH TENAGA KERJA 23,236.20
BAHAN
Pipa C 8" M 1.2000 176,525.00 211,830.00
B
Perlengkapan % 35.0000 176,525.00 61,783.75
JUMLAH HARGA BAHAN 273,613.75
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 296,849.95
E OVERHEAD & PROFIT ( 10% x D ) 29,685.00
F HARGA SATUAN PEKERJAAN ( D + E ) 326,534.95

A.5.1.1.16 Pemasangan 1 Bh Gagang Km/Wc Stainless 80 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 17,803.00
BAHAN
B Gagang Stainless 80 cm Bh 1.0000 294,000.00 294,000.00
JUMLAH HARGA BAHAN 294,000.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 311,803.00
E OVERHEAD & PROFIT ( 10% x D ) 31,180.30
F HARGA SATUAN PEKERJAAN ( D + E ) 342,983.30

A.5.1.1.17 Pemasangan 1 Bh Roof Drain 3"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
Tukang Batu L.02 OH 0.1000 145,000.00 14,500.00
A
A
Kepala Tukang L.03 OH 0.0100 170,000.00 1,700.00
Mandor L.04 OH 0.0050 120,600.00 603.00
JUMLAH TENAGA KERJA 17,803.00
BAHAN
B Roof Drain 4" Bh 1.0000 68,200.00 68,200.00
JUMLAH HARGA BAHAN 68,200.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 86,003.00
E OVERHEAD & PROFIT ( 10% x D ) 8,600.30
F HARGA SATUAN PEKERJAAN ( D + E ) 94,603.30

A.5.1.1.18 Pemasangan 1 M1 Pipa PVC Tipe AW Diameter 4"


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0810 100,000.00 8,100.00
Tukang Batu L.02 OH 0.1350 145,000.00 19,575.00
A
Kepala Tukang L.03 OH 0.0135 170,000.00 2,295.00
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 30,452.40
BAHAN
Pipa PVC 4" M 1.2000 85,250.00 102,300.00
B
Perlengkapan % 35.0000 85,250.00 29,837.50
JUMLAH HARGA BAHAN 132,137.50
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 162,589.90
E OVERHEAD & PROFIT ( 10% x D ) 16,258.99
F HARGA SATUAN PEKERJAAN ( D + E ) 178,848.89
17,803.00

26,200.00

44,003.00
4,400.30
48,403.30

66,403.00

15,700.00
130.00
82,233.00
8,223.30
90,456.30
Salakan, Mei 2022

Nomor : 001/SP/CV.KEC/2022
Lampiran : -
Perihal : Surat Permohonan Sondir

Sehubungan dengan adanya Paket Pekerjaan Perencanaan Pembangunan Tribun Lapangan Upacara Kawasan Perkantoran Bukit Halimun
pada Dinas Pekerjaan Umum dan Penataan Ruang Kab. Banggai dengan ini kami selaku Pihak Konsultan Perencana dalam Hal ini CV.
KAUTSAR Engineering Consultant memohon kepada Dinas Pekerjaan Umum Kab. Banggai untuk melakukan Uji Tanah (Sondir)
sebanyak 1 Titik dilokasi Kec. Luwuk Selatan.

Demikian Surat Permohonan ini kami buat, atas perhatian dan kerjasama kami ucapkan terima kasih,-

yang membuat :
CV. KAUTSAR Engineering Consultant

MUH. TRIMUKTI, ST
Direktur
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA

PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN


PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

A.6.1.1 ANALISA HARGA SATUAN PEKERJAAN PENANAMAN POHON DAN BUNGA


A.6.1.1.1 Penanaman Pohon Palem Raja
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Palem Raja T 2 m Btg 1.0000 997,500.00 997,500.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 997,520.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,000,321.66
E OVERHEAD & PROFIT ( 10% x D ) 100,032.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,100,353.83

A.6.1.1.2 Penanaman Pohon Palem Putri


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Palem Putri Btg 1.0000 997,500.00 997,500.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 997,520.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,000,321.66
E OVERHEAD & PROFIT ( 10% x D ) 100,032.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,100,353.83

A.6.1.1.2 Penanaman Pohon Palem Botol


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Palem Botol Btg 1.0000 997,500.00 997,500.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 997,520.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,000,321.66
E OVERHEAD & PROFIT ( 10% x D ) 100,032.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,100,353.83

A.6.1.1.3 Penanaman Pohon Palem Ekor Tupai


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Palem Ekor Tupai Btg 1.0000 997,500.00 997,500.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 997,520.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,000,321.66
E OVERHEAD & PROFIT ( 10% x D ) 100,032.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,100,353.83

A.6.1.1.4 Penanaman Pohon Cemara Udang


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Cemara Udang Btg 1.0000 1,391,200.00 1,391,200.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 1,391,220.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,394,021.66
E OVERHEAD & PROFIT ( 10% x D ) 139,402.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,533,423.83

A.6.1.1.5 Penanaman Pohon Pucuk Merah


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Pucuk Merah Btg 1.0000 1,706,200.00 1,706,200.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 1,706,220.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,709,021.66
E OVERHEAD & PROFIT ( 10% x D ) 170,902.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,879,923.83

A.6.1.1.6 Penanaman Pohon Beringin Bonsai


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Beringin Bonsai Btg 1.0000 2,572,500.00 2,572,500.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 2,572,520.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 2,575,321.66
E OVERHEAD & PROFIT ( 10% x D ) 257,532.17
F HARGA SATUAN PEKERJAAN ( D + E ) 2,832,853.83

A.6.1.1.7 Penanaman Pohon Flamboyan


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Flamboyan Btg 1.0000 1,575,000.00 1,575,000.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 1,575,020.16
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,577,821.66
E OVERHEAD & PROFIT ( 10% x D ) 157,782.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,735,603.83

A.6.1.1.8 Penanaman Pohon Angsana


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0250 100,000.00 2,500.00
A
Mandor L.04 OH 0.0025 120,600.00 301.50
JUMLAH TENAGA KERJA 2,801.50
BAHAN
Pohon Angsana Btg 1.0000 1,785,000.00 1,785,000.00
B
Pupuk Kandang Kg 0.0800 25,200.00 20.16
JUMLAH HARGA BAHAN 1,785,020.16

PERALATAN
C - - - - -
C
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 1,787,821.66
E OVERHEAD & PROFIT ( 10% x D ) 178,782.17
F HARGA SATUAN PEKERJAAN ( D + E ) 1,966,603.83

A.6.1.1.9 Penanaman Rumput Gajah Mini


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
A
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 4,482.40
BAHAN
Rumput Gajah Mini M2 0.5000 121,500.00 60,750.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 60,761.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 65,243.49
E OVERHEAD & PROFIT ( 10% x D ) 6,524.35
F HARGA SATUAN PEKERJAAN ( D + E ) 71,767.84

A.6.1.1.10 Penanaman Rumput Manila


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0400 100,000.00 4,000.00
A
Mandor L.04 OH 0.0040 120,600.00 482.40
JUMLAH TENAGA KERJA 4,482.40
BAHAN
Rumput Manila M2 0.5000 121,500.00 60,750.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 60,761.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 65,243.49
E OVERHEAD & PROFIT ( 10% x D ) 6,524.35
F HARGA SATUAN PEKERJAAN ( D + E ) 71,767.84

A.6.1.1.11 Penanaman Bunga Asoka


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 2,206.00
BAHAN
Bunga Asoka M2 1.0000 189,000.00 189,000.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 189,011.09

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 191,217.09
E OVERHEAD & PROFIT ( 10% x D ) 19,121.71
F HARGA SATUAN PEKERJAAN ( D + E ) 210,338.80

A.6.1.1.11 Penanaman Bunga Bakung


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 2,206.00
BAHAN
Bunga Bakung M2 1.0000 288,700.00 288,700.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 288,711.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 290,917.09
E OVERHEAD & PROFIT ( 10% x D ) 29,091.71
F HARGA SATUAN PEKERJAAN ( D + E ) 320,008.80

A.6.1.1.11 Penanaman Bunga Pentas


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 2,206.00
BAHAN
Bunga Pentas M2 1.0000 241,500.00 241,500.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 241,511.09
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 243,717.09
E OVERHEAD & PROFIT ( 10% x D ) 24,371.71
F HARGA SATUAN PEKERJAAN ( D + E ) 268,088.80

A.6.1.1.11 Penanaman Bunga Bougenville


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 2,206.00
BAHAN
Bunga Bougenville M2 1.0000 241,500.00 241,500.00
B
Pupuk Kandang Kg 0.0440 25,200.00 11.09
JUMLAH HARGA BAHAN 241,511.09

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 243,717.09
E OVERHEAD & PROFIT ( 10% x D ) 24,371.71
F HARGA SATUAN PEKERJAAN ( D + E ) 268,088.80
A.6.1.1.12 Penanaman Bunga Lantana
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0100 100,000.00 1,000.00
A
Mandor L.04 OH 0.0100 120,600.00 1,206.00
JUMLAH TENAGA KERJA 2,206.00
BAHAN
Bunga Lantana M2 1.0000 241,500.00 241,500.00
B
Pupuk Kandang Kg 0.4000 25,200.00 100.80
JUMLAH HARGA BAHAN 241,600.80
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) 243,806.80
E OVERHEAD & PROFIT ( 10% x D ) 24,380.68
F HARGA SATUAN PEKERJAAN ( D + E ) 268,187.48
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN

KEGIATAN : PEMBANGUNAN RUMAH SAKIT BERSERTA SARANA DAN PRASARANA PENDUKUNGNYA


PEMBANGUNAN RUANG NICU RSUD TRIKORA SALAKAN
PEKERJAAN :
LOKASI : RSUD TRIKORA SALAKAN
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

1.1 ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN


A.2.2.1.10 Pembuatan 1 M2 Steger / Perancah dari Bambu
HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 #REF! #REF!
Tukang Kayu L.02 OH 2.0000 #REF! #REF!
A
Kepala Tukang L.03 OH 0.2000 #REF! #REF!
Mandor L.04 OH 0.0500 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
Bambu Diameter 6 - 8 / 600 Cm Batang 1.2500 14,700.00 18,375.00
B
Tali Ijuk M3 0.1860 31,500.00 5,859.00
JUMLAH HARGA BAHAN 24,234.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!

A.2.2.1.11 Pembuatan 1 Buah Kotak Adukan Ukuran 40 Cm x 50 Cm x 25 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Tukang Kayu L.02 OH 0.3000 #REF! #REF!
A
Kepala Tukang L.03 OH 0.0300 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
Kayu Papan Kelas III M3 0.0360 1,785,000.00 64,260.00
B Kayu Balok 5/7 Kelas III M3 -
Paku Biasa Kg 0.0800 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!

A.2.2.1.12 Pembuatan 1 M2 Jalan Sementara


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 1.0000 #REF! #REF!
A
Mandor L.04 OH 0.0050 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
Batu Belah M3 0.1500 288,700.00 43,305.00
B Batu Pecah M3 0.0900 341,200.00 30,708.00
Pasir Pasang M3 0.0100 #REF! #REF!
JUMLAH HARGA BAHAN #REF!
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!

A.2.2.1.13 Pembongkaran 1 M3 Beton Bertulang


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 13.3340 #REF! #REF!
A
Mandor L.04 OH 0.6660 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
B - - - - -
JUMLAH HARGA BAHAN -
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!

A.2.2.1.15 Pemasangan 1 M2 Pagar Kawat Jaring Galvanis Panjang 240 Cm


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.0420 #REF! #REF!
Tukang L.02 OH 0.0040 #REF! #REF!
A
Kepala Tukang L.03 OH 0.0020 #REF! #REF!
Mandor L.04 OH 0.0420 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
B Kawat Jaring Lbr 0.1434 346,500.00 49,688.10
JUMLAH HARGA BAHAN 49,688.10

PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!

A.2.2.1.16 Pemasangan 1 M2 Papan Nama Proyek


HARGA SATUAN JUMLAH HARGA
NO URAIAN KODE SATUAN KOEFISIEN
( Rp ) ( Rp )
TENAGA
Pekerja L.01 OH 0.5000 #REF! #REF!
Tukang L.02 OH 0.2000 #REF! #REF!
A
Kepala Tukang L.03 OH 0.1000 #REF! #REF!
Mandor L.04 OH 0.1000 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
Tripleks 3 mm Lbr 0.3000 57,700.00 17,310.00
Kayu 4/6 Kelas II M3 0.0300 2,310,000.00 69,300.00
B
Paku 2 - 5 Kg 0.2000 42,000.00 8,400.00
Baliho M2 0.7200 52,500.00 37,800.00
JUMLAH HARGA BAHAN 132,810.00
PERALATAN
C - - - - -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C ) #REF!
E OVERHEAD & PROFIT ( ### xD) #REF!
F HARGA SATUAN PEKERJAAN ( D + E ) #REF!
NO. 28/PRT/M/2016
LUAS BANGUNAN

URAIAN PANJANG LEBAR

JUMLAH LANTAI 1 + 2

LANTAI 1
- Carport M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1

LANTAI 2
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
PEKERJAAN PERSIAPAN

URAIAN PANJANG

VOLUME PENGUKURAN DAN PEMASANGAN BOUWPLANK


- Sisi M1
- Sisi M1
- Sisi M1
- Sisi M1

URAIAN PANJANG LEBAR

VOLUME TIMBUNAN HALAMAN


- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1
- Ruang M1

URAIAN PANJANG

VOLUME PAGAR SEMENTARA


- Sisi M1
- Sisi M1
- Sisi M1
- Sisi M1

PEKERJAAN TANAH DAN PASIR

URAIAN PANJANG LEBAR

VOLUME STRAUSS PILE


- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
VOLUME BETON CYCLOP
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1
- Strauss Pile M1

URAIAN PANJANG LEBAR

VOLUME GALIAN TANAH PONDASI TYPE 1


- Galian Tanah horisontal M1
- Galian Tanah vertikal M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 2


- Galian Tanah horisontal M1
- Galian Tanah vertikal M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 3


- Galian Tanah horisontal M1
- Galian Tanah vertikal M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN TANAH PONDASI TYPE 4 (TALUD)


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 1


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 2


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 3


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 4


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

VOLUME GALIAN PONDASI FOOT PLAT 5


- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1
- Galian Tanah M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 2


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 3


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN PONDASI BATU KALI 4


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN BEKAS GALIAN FOOT PLAT 1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 2


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 3


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 4


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

VOLUME URUGAN BEKAS GALIAN FOOT PLAT 5


- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1
- Urugan Kembali M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN / TIMBUNAN TANAH DROP OFF DAN RAM
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

VOLUME URUGAN / TIMBUNAN TANAH GEDUNG UTAMA


- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

VOLUME URUGAN / TIMBUNAN TANAH TAMAN


- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1
- Urugan Tanah M1

URAIAN

VOLUME URUGAN / TIMBUNAN TANAH GEDUNG UTAMA -

VOLUME URUGAN / TIMBUNAN TANAH DROP OFF DAN RAM -

VOLUME URUGAN / TIMBUNAN TANAH TAMAN -

PLUS PEMADATAN 15%

VOLUME TIMBUNAN DIDATANGKAN

VOLUME TOTAL URUGAN / TIMBUNAN

VOLUME TOTAL GALIAN ( BT. KALI & FOOT PLAT )

VOLUME URUGAN KEMBALI (BT, KALI & FOOT PLAT

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN PASIR BAWAH LANTAI 1 DROP OFF DAN RAM
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -

VOLUME URUGAN PASIR BAWAH LANTAI GEDUNG UTAMA


- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir - M1 -
- Urugan Pasir M1
- Urugan Pasir M1

VOLUME URUGAN PASIR BAWAH LANTAI TAMAN


- Urugan Pasir - M1 -
- Urugan Pasir M1
- Urugan Pasir M1
- Urugan Pasir M1
- Urugan Pasir M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 1
- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 2


- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 3


- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi - M1 -
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH PONDASI 4


- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1
- Urugan Pasir Pondasi M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 1


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 2


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 3


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 4


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

VOLUME URUGAN / TIMBUNAN PASIR BAWAH FOOT PLAT 5


- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1
- Urugan Pasir Foot Plat M1

PEKERJAAN PASANGAN DAN PELESTE

LANTAI 1

URAIAN PANJANG LEBAR

VOLUME PONDASI BETON CYCLOP


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 1


- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
VOLUME PONDASI BATU KOSONG 2
- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 3


- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong - M1 -
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

VOLUME PONDASI BATU KOSONG 4


- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1
- Pas. Batu Kosong M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PONDASI BATU KALI / GUNUNG 1
- Pas. Batu Kali - M1
- Pas. Batu Kali - M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 2


- Pas. Batu Kali - M1
- Pas. Batu Kali - M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 3


- Pas. Batu Kali - M1
- Pas. Batu Kali - M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI BATU KALI / GUNUNG 4


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

VOLUME PONDASI TALUD


- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1
- Pas. Batu Kali M1

URAIAN PANJANG

VOLUME DINDING BATU BATA / BATAKO - LUAS KUSEN - LUAS TIANG KOLOM

VOLUME DINDING BATU BATA / BATAKO


- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1

LUAS KUSEN
- kusen Pintu M1
- kusen Pintu M1
- kusen Pintu M1
- kusen Pintu Vent M1
- kusen Pintu M1
- kusen Pintu Vent M1
- kusen Pintu M1
- kusen Pintu Vent M1
- kusen Pintu M1
- kusen Pintu Vent M1
- kusen Pintu M1
- kusen Pintu Vent M1
- kusen Pintu M1
- kusen Pintu M1

- kusen Jendela M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela Vent M1
- kusen Jendela M1
- kusen Jendela M1
- kusen Jendela M1

- kusen Ventilasi M1
- kusen Ventilasi M1
- kusen Ventilasi M1
- kusen Ventilasi M1
- kusen M1

LUAS KOLOM DAN BALOK


- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Balok M1
- Balok M1
- Balok M1
- Balok M1

URAIAN PANJANG LEBAR

VOLUME LANTAI GRANIT POLISHED (HALUS)


- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT UNPOLISHED (KASAR)

- Keramik / Granit M1
- Keramik / Granit M1

- Keramik / Granit M1

- Keramik / Granit M1

- Keramik / Granit M1

- Keramik / Granit M1

- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI KERAMIK KM/WC
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

VOLUME LANTAI KERAMIK DROP OFF


- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1
- Keramik Drop Off M1

VOLUME LANTAI KERAMIK TAMAN


- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1
- Keramik Taman M1

VOLUME LANTAI KERAMIK RAM DAN STEP


- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1
- Keramik Ram dan Step M1

URAIAN PANJANG

VOLUME DINDING KERAMIK KM/WC LANTAI 1


- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

URAIAN PANJANG

VOLUME BATU ALAM / TEMPEL LANTAI 1


- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1

URAIAN PANJANG

VOLUME PLINT GRANIT 1


- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1

- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1
- Plint Granit M1

LUAS LEBAR
URAIAN
VOLUME ATAS
COR BETON LANTAI KERJA
- - M2
- - M2
- - M2
- M2

LUAS LEBAR
URAIAN
VOLUME ATAS
VOLUME PELESTERAN DINDING
- Pelesteran Dinding - M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

VOLUME PELESTERAN DINDING SUNDAP


- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

VOLUME PELESTERAN DINDING TERAS


- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

LEBAR
URAIAN PANJANG
URAIAN PANJANG
ATAS
VOLUME PELESTERAN PONDASI
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1
- Pelesteran Pondasi M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PAVING BLOK
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1
- Paving Blok M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME KANSTEEN
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1
- Kansteen M1

LEBAR
URAIAN PANJANG
ATAS
COR RABAT KELILING
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
- Cor Rabat M1
PEKERJAAN PASANGAN DAN PELESTE

LANTAI 2

VOLUME DINDING BATU BATA / BATAKO - LUAS KUSEN - LUAS TIANG KOLOM

VOLUME DINDING BATU BATA / BATAKO


- Sundap trapesium Horisontal M1
- Sundap trapesium Vertikal M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- Pas. Batu Bata M1
- M1
- M1

LUAS KUSEN
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1
- Kusen Pintu Vent M1
- Kusen Pintu M1

- Kusen Jendela M1
- Kusen Jendela Vent M1
- Kusen Jendela M1
- Kusen Jendela Vent M1

- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen Ventilasi M1
- Kusen M1
- Kusen M1
- Kusen M1

KOLOM
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1
- Kolom M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT POLISHED (HALUS)
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI GRANIT UNPOLISHED (KASAR)
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1
- Keramik / Granit M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME LANTAI KERAMIK KM/WC
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME DINDING KERAMIK KM/WC LANTAI 2
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1
- Keramik Km/Wc M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME BATU ALAM / TEMPEL LANTAI 2
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1
- Batu Alam M1

LEBAR
URAIAN PANJANG
ATAS
VOLUME PLINT GRANIT 2
- Plint Granit Dindinghorisontal M1
- Plint Granit Dindingvertikal M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1
- Plint Granit Dinding M1

- Plint Granit Kolom M1


- Plint Granit Kolom M1
- Plint Granit Kolom M1
- Plint Granit Kolom M1

LUAS LEBAR
URAIAN
VOLUME ATAS
VOLUME PELESTERAN DINDING
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2
- Pelesteran Dinding M2

BETON STRUKTUR

LANTAI 1

URAIAN PANJANG

BETON CYCLOP 30 CM

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

- Beton Cyclop M1

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 20/30
- Pembesian horisontal M1
- Pembesian vertikal - M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting 2 Kali Pakai M1

- Cor Beton M1

- Pelesteran Sloof Luar M1

- Acian Sloof Luar M1


UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 25/45
- Pembesian - M1
- Pembesian - M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1
- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
SLOOF 35/60
- Pembesian horisontal - M1
- Pembesian vertikal - M1
- Pembesian vertikal M1
- Pembesian vertikal M1
- M1

- Besi Beugel M1 -
- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 30/40
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 40/55
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting 1 Kali Pakai M1

- Cor Beton M1

- Pelesteran M1
- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 45/70
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 45/70-115
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
KOLOM 20/20
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 20/25
- Pembesian - M1 6.00
- Pembesian - M1 6.00
- Pembesian M1 6.00
- Pembesian M1
- M1

- Besi Beugel 0.88 M1 -

- Bekisting - M1

- Cor Beton - M1

- Pelesteran 39.78 M1

- Acian 39.78 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 25/40
- Pembesian Horisontal 74.00 M1 12.00
- Pembesian Vertikal - M1 12.00
- Pembesian M1
- Pembesian M1
74.00 M1

- Besi Beugel 1.28 M1 493.33

- Bekisting 4 Kali Pakai 74.00 M1

- Cor Beton 74.00 M1

- Pelesteran 13.80 M1

- Acian 13.80 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 35/55
- Pembesian 82.90 M1 16.00
- Pembesian 47.00 M1 16.00
- Pembesian M1
- Pembesian M1
129.90 M1

- Besi Beugel 1.78 M1 866.00

- Bekisting 129.90 M1

- Cor Beton 129.90 M1

- Pelesteran 71.80 M1

- Acian 71.80 M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
RINGBALK 20/55
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -
- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/20
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
TANGGA

- Pembesian

- Pembesian

- Bekisting - M2

- Bekisting - M2

- Cor Beton - M2

- Cor Beton - M2

- Pelesteran - M1
- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT TANGGA
BALOK TANGGA
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
ANAK TANGGA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 M1
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 1

- Pembesian

- Bekisting - M2

- Cor Beton - M2

- Pelesteran M1

- Acian - M1

- Cat WaterProfing - M1

- Serat Fiber - M1

- Pipa Air hujan M1

- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 2 Kali Pakai - M1 -
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 2

- Pembesian

- Bekisting - M2

- Cor Beton - M2

- Pelesteran M1

- Acian - M1

- Cat WaterProfing - M1

- Serat Fiber - M1

- Pipa Air hujan M1

- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 - M1 -
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 3

- Pembesian
- Bekisting M2

- Cor Beton M2

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 M1
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 110/120 (16 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1


- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 120/135 (16 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1
- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 145/170 (16 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 145/215 (6 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1
- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
FOOT PLAT 105/195 (1 TITIK)
- Pembesian Plat M1
- Pembesian Plat M1
- Pembesian Foot M1
- Pembesian Foot M1

- Bekisting Plat M1

- Bekisting Foot M1

- Cor Beton Plat M1

- Cor Beton Foot M1

- Urugan Pasir M1

- Cor Base M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

BETON STRUKTUR

LANTAI 2

JUMLAH
URAIAN PANJANG
BATANG
BALOK 20/35
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
Cat : Ukuran Tinggi Balok 1/12 x Bentangan, Lebar Balok 1/2 x Tinggi Balok

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 30/45
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -
- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
KOLOM 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
PLAT LANTAI T = 12 CM

- Pembesian

- Bekisting - M1

- Cor Beton - M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT LANTAI
RUANG 1
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 3
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 4
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 5
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 6
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 7
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
RUANG 8
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 - M1 -
- Bekisting 2 - M1 -
- Bekisting 3 - M1 -
- Bekisting 4 - M1 -
- Bekisting 5 - M1 -
- Bekisting 6 - M1 -
- Bekisting 7 - M1 -
- Bekisting 8 - M1 -

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/15
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/30
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/25
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1

- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
BALOK 15/20
- Pembesian Horisontal M1
- Pembesian Vertikal M1
- Pembesian M1
- Pembesian M1
- M1

- Besi Beugel M1 -

- Bekisting M1

- Cor Beton M1

- Pelesteran M1
- Acian M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 4

- Pembesian

- Bekisting - M2

- Cor Beton - M2

- Pelesteran M1

- Acian - M1
- Cat WaterProfing - M1

- Serat Fiber - M1

- Pipa Air hujan 10.00 M1

- Roof Drain 8.00 Bh


UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 - M1 -
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT PROFIL ALUCOPAN 5

- Pembesian

- Bekisting - M2

- Cor Beton - M2

- Pelesteran M1

- Acian - M1

- Cat WaterProfing - M1

- Serat Fiber - M1

- Pipa Air hujan M1


- Roof Drain Bh
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT JENDELA
JENDELA 1
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 2
- Panjang Besi Vertikal (Y) M1 -
- Panjang Besi Horisontal (X) M1 -
JENDELA 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
JENDELA 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting 1 - M1 -
- Bekisting 2 M1
- Bekisting 3 M1
- Bekisting 4 M1

JUMLAH
URAIAN PANJANG
BATANG
PLAT DROP OFF T = 12 CM

- Pembesian

- Bekisting M1

- Cor Beton M1
UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
HITUNG PANJANG TOTAL BESI PLAT LANTAI
RUANG 1
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 2
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 3
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 4
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1
RUANG 5
- Panjang Besi Vertikal (Y) M1
- Panjang Besi Horisontal (X) M1

URAIAN PANJANG LEBAR

HITUNG LUAS BEKISTING


- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1
- Bekisting M1

JUMLAH
URAIAN PANJANG
BATANG
TEMPAT DUDUK BETON
- Pembesian M1
- Pembesian M1
- Pembesian M1
- Pembesian M1

- Bekisting M1
- Bekisting M1

- Cor Beton M1
- Cor Beton M1

- Pelesteran M1
- Pelesteran M1

UKURAN BESI 6 8 10 12 13
BERAT / METER 0.222 0.395 0.617 0.888 1.040
JUMLAH
URAIAN PANJANG
BATANG
COR PLAT BESI WIREMESH
- Wiremesh M1
- Wiremesh M1
- Wiremesh M1
- Wiremesh M1

- Cor Beton M1

- Bondek M1
UKURAN BESI WIREMESH M6 M7 M8 M9
BERAT / METER 3.070 4.170 5.450 6.900
UKURAN BESI BONDEK 0.75 0.8 1.0
BERAT / METER 6.950 7.400 9.500

JUMLAH
URAIAN PANJANG
BATANG
TIANG BAJA WF 350
- Tiang M1
- Tiang M1
- Tiang M1
- Tiang M1
- Tiang M1

ACCESSORIES

- Anchor Bolt L / U
- Base Plate M1
- Base Plate M1
- Base Plate M1
- Base Plate M1

- Rip 1 / Stifner M1
- Rip 2 / Stifner M1
- Rip 3 / Stifner M1
- Rip 4 Stifner M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1
UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9
BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BAJA WF 200
- Balok depan M1
- balok belakang M1
- balok M1
- balok SAMPING M1
- balok M1

BALOK POTONGAN BAJA WF 200


- Balok Tengah M1
- balok Belakang M1
- balok M1
- balok M1
- balok M1

ACCESSORIES
- Baut Mur Tengah
- Baut Mur Belakang
- Baut Mur

- Endplate tengah M1
- Endplate belakang M1
- Endplate M1
- Endplate M1

- Rip 1 / Stifner Tengah M1


- Rip 2 / Stifner Belakang M1
- Rip 3 / Stifner samping M1
- Rip 4 / Stifner M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BAJA WF BB1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1

ACCESSORIES
- Baut Mur
- Baut Mur
- Baut Mur

- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

- Rip 1 M1
- Rip 2 M1
- Rip 3 M1
- Rip 4 M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK TERITISAN BAJA WF BB2
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1
- Kuda-Kuda M1

ACCESSORIES
- Baut Mur
- Baut Mur
- Baut Mur

- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

- Rip 1 M1
- Rip 2 M1
- Rip 3 M1
- Rip 4 M1

- Cat M1
- Cat M1
- Cat M1
- Cat M1

UKURAN BAJA WF 150.75.5.7 200.100.5,5.8 250.125.6.9


BERAT / METER 14.000 21.333 29.583
UKURAN BAJA HBEAM 150.150.7.10 200.200.8.12 250.250.9.14
BERAT / METER 31.500 49.917 72.417
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980
JUMLAH
URAIAN PANJANG
BATANG
GORDING KANAL C ATAS
- Gording Kanal C 37.50 M1 23.00
- Gording Kanal C M1
- Gording Kanal C M1
- Gording Kanal C M1
- Gording Kanal C M1
UKURAN KANAL C 75.45.15.2,3 100.50.20.3,2 125.50.20.3,2
BERAT / METER 2.320 4.067 4.517

JUMLAH
URAIAN PANJANG
BATANG
KUDA-KUDA BESI SIKU 100.75.10
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT 60.60.6
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG 40.40.4
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur
BESI SIKU 40.40.4 50.50.5 60.60.6
BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 1
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980
JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 2
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1

GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

JUMLAH
URAIAN PANJANG
BATANG
BALOK BESI SIKU 3
- Besi Siku Kaki Kuda-kuda JL Atas M1
- Besi Siku Kaki Kuda-kuda JL Bawah M1
- Besi Siku M1
M1
GAPIT
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

SOKONG
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1
- Besi Siku M1

PLAT
- Endplate M1
- Endplate M1
- Endplate M1
- Endplate M1

BAUT MUR
- Baut Mur
- Baut Mur
- Baut Mur

BESI SIKU 40.40.4 50.50.5 60.60.6


BERAT / METER 2.417 3.750 5.420
UKURAN PLAT BESI HITAM 122.244 Tbl 1,2 mm 122.244 Tbl 2 mm 122.244 Tbl 6 mm
BERAT / METER2 9.396 15.671 46.980

UKURAN PANJANG
URAIAN
KAYU ATAS
KONSTRUKSI KUDA-KUDA KAYU

BALOK KUDA-KUDA
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2
- Kuda-kuda M2

BALOK NOK / BUBUNGAN


- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2
- Bubungan M2

BALOK JURAI
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2
- Jurai M2

BALOK SOKONG
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2
- Sokong M2

BALOK GAPIT
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2
- Gapit M2

BALOK TIANG GAPIT


- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2
- Tiang Gapit M2

SKUR ANGIN
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2
- Skur Angin M2

UKURAN PANJANG
URAIAN
URAIAN
KAYU ATAS
KONSTRUKSI GORDING KAYU
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2
- Gording M2

LEBAR
URAIAN PANJANG
ATAS
KONSTRUKSI ATAP / KAP LANTAI 1

TYPE TRAPESIUM
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE SEGITIGA
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE PERSEGI PANJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE JAJARAN GENJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

LEBAR
URAIAN PANJANG
ATAS
KONSTRUKSI ATAP / KAP LANTAI 2

TYPE TRAPESIUM
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE SEGITIGA
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

TYPE PERSEGI PANJANG


- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
TYPE JAJARAN GENJANG
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1
- Atap M1

LEBAR
URAIAN PANJANG
ATAS
BUBUNGAN / NOK ATAP LANTAI 1
- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1

BUBUNGAN / NOK ATAP LANTAI 2


- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1
- Bubungan M1

LEBAR
URAIAN PANJANG
ATAS
LISTPLANK LANTAI 1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1

LISTPLANK LANTAI 2
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1
- Listplank M1
LEBAR
URAIAN PANJANG
ATAS
LANTAI 1

PLAFOND DALAM
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

PLAFOND LUAR
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

LEBAR
URAIAN PANJANG
ATAS
LANTAI 2

PLAFOND DALAM
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

PLAFOND LUAR
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1
- Plafond M1

LEBAR
URAIAN PANJANG
ATAS
LIST PLAFOND 1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1

LIST PLAFOND 2
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
- List Plafond M1
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P4
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P4

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P5
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P5

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P6
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P6

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P7
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P7

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P8
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P8

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P9
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Rel M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P9

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P6
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P6

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P7
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P7

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
UK. KAYU
URAIAN LEBAR
PANJANG
PINTU KAYU P8
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2
- Kusen Pintu Kayu M2

- Panil Pintu M1
- Panil Pintu M1

- Cat Kusen M1
- Cat Panil M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Ventilasi M1
- Bingkai Ventilasi M1

- Kaca M1
- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

URAIAN

ACCESORIES P8

- Engsel Pintu

- Grendel Pintu

- Kunci Pintu 2 Slaag

- Master Silinder Pintu

- Gagang Pintu Stainles

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis
ALUMINIUM

LANTAI 1

URAIAN PANJANG LEBAR

PINTU ALUMINIUM P1 2 BUAH


- Kusen Aluminium Pintu / Jendela M1
- Kusen Aluminium Pintu / Jendela M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Jendela M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES P1

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"


- Rambuncis

LANTAI 1

PINTU ALUMINIUM P2 2 BUAH


- Kusen Aluminium Pintu / Jendela M1
- Kusen Aluminium Pintu / Jendela M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela M1
- Kaca Jendela M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES P2

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

PINTU ALUMINIUM P3 2 BUAH


- Kusen Aluminium Pintu / Jendela M1
- Kusen Aluminium Pintu / Jendela M1

- Kusen Aluminium Ventilasi M1


- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Pintu M1
- Kaca Pintu M1

- Kaca Jendela M1
- Kaca Jendela M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES P3

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

PINTU ALUMINIUM P10 5 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1
ACCESORIES P10

- Gagang Pintu

- Engsel

- Grendel

LANTAI 1

PINTU ALUMINIUM P11 4 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1

ACCESORIES P11

- Gagang Pintu

- Engsel

- Grendel

URAIAN PANJANG LEBAR

LANTAI 1

JENDELA ALUMINIUM J1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J1
- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J2
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J3
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J3

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J4
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J5
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J5

- Casement Jendela10"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J6
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J6

- Casement Jendela10"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J7
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1
- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J7

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

JENDELA ALUMINIUM J8
- Kusen Aluminium Jendela Pendek M1
- Kusen Aluminium Jendela Tinggi M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J8

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1
VENTILASI ALUMINIUM V1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V2
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V3
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V3

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 1

VENTILASI ALUMINIUM V4
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

ALUMINIUM

LANTAI 2

URAIAN PANJANG LEBAR

PINTU ALUMINIUM P3 1 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Kusen Aluminium M1
- Kusen Aluminium M1

- Bingkai Aluminium M1
- Bingkai Aluminium M1
- Bingkai Aluminium M1
- Bingkai Aluminium M1

- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

- Kaca M1
- Kaca M1

ACCESORIES P1

- Gantungan Pintu Atas

- Gantungan Pintu Bawah

- Penjepit Pintu Atas

- Penjepit Pintu Bawah

- Kunci Pintu Kaca

- Door Pull Stainless

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

PINTU ALUMINIUM P10 2 BUAH


- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1

ACCESORIES P10

- Gagang Pintu

- Engsel

- Grendel

LANTAI 2
PINTU ALUMINIUM P11 2 BUAH
- Kusen Aluminium M1
- Kusen Aluminium M1

- Panil M1
- Panil M1

ACCESORIES P11

- Gagang Pintu

- Engsel

- Grendel

LANTAI 2

JENDELA ALUMINIUM J4
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

JENDELA ALUMINIUM J6
- Kusen Aluminium Jendela M1
- Kusen Aluminium Jendela M1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Jendela M1


- Bingkai Aluminium Jendela M1
- Bingkai Aluminium Ventilasi M1
- Bingkai Aluminium Ventilasi M1

- Kaca Jendela M1
- Kaca Jendela M1
- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES J2

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

VENTILASI ALUMINIUM V1
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V1

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LANTAI 2

VENTILASI ALUMINIUM V4
- Kusen Aluminium Ventilasi M1
- Kusen Aluminium Ventilasi M1

- Bingkai Aluminium Ventilasi M1


- Bingkai Aluminium Ventilasi M1

- Kaca Ventilasi M1
- Kaca Ventilasi M1

ACCESORIES V4

- Casement Jendela12"

- Casement Ventilasi 8"

- Rambuncis

LEBAR
URAIAN PANJANG
ATAS
EPOXY LANTAI

- M1
- M1
- M1
- M1
- M1

LEBAR
URAIAN PANJANG
ATAS
SEPTICTANK 2 BUAH

- Galian 2.2x1x1.5 2.20 M1 1.00

- Urugan Pasir 2.20 M1 1.00

- Pas. Batu Bata 8.50 M1

- Pelesteran 8.50 M1
Besi 10" Vertikal 2.00 M1 29.33
Besi 10" Horisontal 4.40 M1 13.33
- Besi 10"
- Bekisting 2.20 M1 1.00

- Cor Beton Bertulang 2.20 M1 1.00


- Cor Beton 2.20 M1 1.00

- Pipa PVC 2" 1.00 M1

PERESAPAN 2 BUAH

- Galian 1.25x1x1.15 1.25 M1 1.00

- Pipa PVC 3" 1.50 M1

- Urugan Batu Karang 1.25 M1 1.00

- Urugan Pasir 1.25 M1 1.00

- Urugan Kembali 1.25 M1 1.00

LEBAR
URAIAN PANJANG
ATAS
SALURAN AIR HUJAN

- Galian M1

- Cor Beton M1

- Pelesteran M1

- Acian M1

- Urugan Pasir M1

LEBAR
URAIAN PANJANG
ATAS
ALUCOPAN TYPE 1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 2
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 3
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

LEBAR
URAIAN PANJANG
ATAS
ALUCOPAN TYPE 4
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

ALUCOPAN TYPE 5
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1
- Alucopan M1

URAIAN PANJANG

KUSEN PINTU BESI P1 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN PINTU BESI P2 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN JENDELA BESI J1 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN JENDELA BESI J2 UNP 100.50.5

- Kusen M1
- Kusen M1
- Kusen M1
- Kusen M1

KUSEN VENTILASI BESI V1 UNP 100.50.5

- Kusen bawah M1
- Kusen tengah M1
- Kusen atas M1
- Kusen M1
- Kusen M1

KUSEN VENTILASI BESI V2 UNP 100.50.5

- Kusen bawah M1
- Kusen M1
- Kusen M1
- Kusen M1
UKURAN UNP 50.38.5 (6m) 75.40.5 (6m) 100.50.5 (6m)
BERAT / METER 5.000 7.550 9.367
S BANGUNAN

LEBAR BUAH VOLUME

- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
JAAN PERSIAPAN

BUAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR TINGGI BUAH VOLUME

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

BUAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

N TANAH DAN PASIR

LEBAR TINGGI JUMLAH VOLUME

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR TINGGI JUMLAH VOLUME

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3

VOLUME

M3 #DIV/0! #DIV/0! M3

M3 #DIV/0! #DIV/0! M3

M3 #DIV/0! #DIV/0! M3

- M3

- M3

- M3

- M3

- M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3

- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 - Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

- M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3
M1 0.05 M1 Bh - M3

ANGAN DAN PELESTERAN

LEBAR TINGGI JUMLAH VOLUME

- M3
M1 0.25 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

- M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3
M1 0.20 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

- M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3
M1 M1 M1 Bh - M3

TINGGI JUMLAH VOLUME

- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR JUMLAH VOLUME

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 Bh - M2
M1 Bh - M2

M1 Bh - M2

M1 Bh - M2

M1 Bh - M2

M1 Bh - M2

M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

TINGGI JUMLAH VOLUME

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

TINGGI JUMLAH VOLUME

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH VOLUME

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
0.070 M1 Bh - M3
0.070 M1 Bh - M3
0.070 M1 Bh - M3
0.120 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
2.05 Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
M1 M1 Bh - M3
ANGAN DAN PELESTERAN

- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2
Bh - M2

ON STRUKTUR

LEBAR TINGGI BUAH VOLUME

- M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 M1 Bh - M3

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

- M2

0.30 M1 - M2

0.30 M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2

M1 - M2
M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg
M1 - M2

M2

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 24
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2

M1 - M2

M1 - M2

Total - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 12
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 0.40 Kg 0.150 M - Kg

M1 - M2

M2

M1 - M2
M1 - M2

Total - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh M1 Kg - Kg 28
Bh M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M

M1 - M2

M2

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 13
Bh - M1 Kg - Kg 2
Bh - M1 Kg - Kg 2
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH TOT. PJG BERAT BESI JARAK
VOLUME
BATANG LEBAR UK. BETON BEUGEL

bh
Bh - M1 Kg - Kg 6
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 1.21 Kg - Kg
Bh - M1 1.21 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 0.40 Kg 0.150 M - Kg

0.25 M1 - M2

0.04 M2 - M3

0.25 M1 9.95 M2

0.25 M1 9.95 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 888.00 M1 1.21 Kg 1,074.48 Kg


Bh - M1 1.21 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 1,074.48 Kg

Bh 631.47 M1 0.40 Kg 0.150 M 249.43 Kg

0.37 M1 27.38 M2

0.08 M2 6.02 M3

0.40 M1 5.52 M2

0.40 M1 5.52 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh 1,326.40 M1 1.21 Kg 1,604.94 Kg


Bh 752.00 M1 1.21 Kg 909.92 Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total 2,514.86 Kg

Bh 1,541.48 M1 0.40 Kg 0.150 M 608.88 Kg

0.52 M1 67.55 M2

0.17 M2 21.62 M3

0.55 M1 39.49 M2

0.55 M1 39.49 M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg
M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M1 Kg - Kg

- Kg

- M2

- M2

- M2

M1 - M3

M1 - M3

- M3

M1 - M2
M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2

M1 - M2

M1 - M2

Bh - M1

- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2

M1 - M2

M1 - M2

Bh - M1

- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1
Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 2.00 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg
- M2

M1 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3
M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2
M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

- M2 - M3

- M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2
M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

- M2 - M3

- M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M1 - M2

M1 - M2

Total - M2

M2 - M3

M2 - M3

Total - M3

M2 - M3

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

ON STRUKTUR

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg
M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH TOT. PJG BERAT BESI JARAK
VOLUME
BATANG LEBAR UK. BETON BEUGEL

- M1 Kg - Kg

- M2

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2
M1 1.00 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2

M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg 0.150 M - Kg

M1 - M2

M2 - M3

M1 - M2
M1 - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2
M1 - M2

M1 - M2

Bh - M1

8.00 Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 1.00 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR TEBAL BEUGEL

- M1 Kg - Kg

- M2

M1 - M3

M1 - M2

M1 - M2

M1 - M2

M1 - M2

Bh - M1
- Bh
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 1.00 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

- M1 Kg - Kg

- M2

M2 - M3
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH JUMLAH
VOLUME
BATANG LAPIS
- M1

Btg Bh - M1
Btg Bh - M1
Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

Btg Bh - M1
Btg Bh - M1

LEBAR JUMLAH VOLUME

- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

JUMLAH TOT. PJG BERAT BESI JARAK


VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg
M1 - M2
M1 - M2
Total - M2
M2 - M3
M2 - M3
Total - M3
M1 - M2
M1 - M2
Total - M2
14 16 19 13 Ulir 16 Ulir
1.210 1.578 2.223 1.040 1.578
JUMLAH TOT. PJG BERAT BESI JARAK
VOLUME
BATANG LEBAR UK. BETON BEUGEL

Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Total - Kg

M2 - M3

M1 - M2
M10
8.510

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


BUAH VOLUME
BATANG PANJANG BAJA

Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg
M Bh - M2
M Bh - M2
M Bh - M2
M Bh - M2
Total - M2
250.125.6.9 300.150.6,5.9 350.175.7.11 400.200.8.13
36.667 49.583 66.000
250.250.9.14 300.300.10.15 350.350.12.19 400.400.13.21
94.000 137.000 172.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960
JUMLAH TOTAL BERAT
VOLUME
BATANG PANJANG BESI
3,895.63 Kg
Bh 862.50 M1 4.52 Kg 3,895.63 Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
125.50.20.3,2 150.50.20.3,2
4.517 4.967

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12 100.75.10
5.420 9.660 15.100 21.667 13.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

- Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg
Bh M1 Kg - Kg

M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
M1 M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12 100.75.10
5.420 9.660 15.100 21.667 13.000
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960
JUMLAH TOTAL BERAT
VOLUME
BATANG PANJANG BESI
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12
5.420 9.660 15.100 21.667
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

JUMLAH TOTAL BERAT


VOLUME
BATANG PANJANG BESI
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

- Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg
Bh - M1 Kg - Kg

M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
M1 - M2 Kg Bh - Kg
Total - Kg

Bh Bh - Bh
Bh Bh - Bh
Bh Bh - Bh
Total - Bh
60.60.6 80.80.8 100.100.10 120.120.12
5.420 9.660 15.100 21.667
122.244 Tbl 6 mm 122.244 Tbl 8 mm 122.244 Tbl 10 mm 122.244 Tbl 12 mm
62.752 78.289 93.960

PANJANG
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

PANJANG
TINGGI JUMLAH VOLUME
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2
M1 M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1

- M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
Bh - M1
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LEBAR JUMLAH VOLUME

M1 Bh - M3
M1 Bh - M3
M1 Bh - M3
- M3
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
Bh - M1
Bh - M1
- M1
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
- M2
M1 Bh - M2
M1 Bh - M2
- M2
JUMLAH
BUAH VOLUME
PINTU

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh
LUMINIUM

LEBAR JUMLAH VOLUME

Bh - M1
Bh - M1
Total - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
M1 - Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Psg Bh - Psg

Bh Bh - Bh

Bh Bh - Bh
Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
- Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
Total - M2

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - M1
Bh - M1
Total - M1
- Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Psg - Bh - Psg

Bh Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
Bh - Bh - Bh

Bh - Bh - Bh

Bh - Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2

1.00 Bh - Bh - Bh

3.00 Bh - Bh - Bh

2.00 Bh - Bh - Bh

LEBAR JUMLAH VOLUME

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
M1 - Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
Bh Bh - Bh

- Bh Bh - Bh

- Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh 2.0 Bh - Bh

Bh 2.0 Bh - Bh

Bh 2.0 Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 - Bh - M2
M1 Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2
M1 - Bh - M2
M1 - Bh - M2
M1 - Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LUMINIUM

LEBAR JUMLAH VOLUME

Bh - M1
Bh - M1
Total - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

Bh - M1
Bh - M1
Total - M1
M1 Bh - M2
M1 Bh - M2
Total - M2
M1 Bh - M2
M1 Bh - M2
Total - M2

Bh Bh - Bh

Bh Bh - Bh

Bh Bh - Bh

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2

M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 1.50 M1 2.0 Bh 6.60 M3

M1 0.05 M1 2.0 Bh 0.22 M3

1.50 M1 2.0 Bh 25.50 M2

1.50 M1 2.0 Bh 25.50 M2


Bh 58.67 M1 0.62 Kg 36.20 Kg
Bh 58.67 M1 0.62 Kg 36.20 Kg
Total 72.39 Kg
M1 2.0 Bh 4.40 M2

M1 0.10 M1 2.0 Bh 0.44 M3


M1 0.07 M1 2.0 Bh 0.31 M3

2.0 Bh 2.00 M1

M1 1.15 M1 2.0 Bh 2.88 M3

2.0 Bh 3.00 M1

M1 0.25 M1 2.0 Bh 0.63 M3

M1 0.25 M1 2.0 Bh 0.63 M3

M1 0.65 M1 2.0 Bh 1.63 M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH

M1 M1 Bh - M3

M1 M1 Bh - M3

M1 Bh - M2

M1 Bh - M2

M1 M1 Bh - M3

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

LEBAR
TINGGI JUMLAH VOLUME
ATAS BAWAH
- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

- M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2
M1 Bh - M2

BERAT
JUMLAH VOLUME
BESI
- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg

- Kg

Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
Kg Bh - Kg
100.50.5 (6m) 125.65.6 (6m) 150.75.6,5 (6m) 180.75.7 (6m) 200.80.7,5 (6m)
9.367 13.400 18.667 21.333 24.667
Err:509

Err:509 /m2
-
-

-
-

2.35

panjang tinggi luas


32.75 2.1 68.775
1.8 0.35 0.63
5.5 1.45 7.975
77.38
-

2.35
overstek sambungan
PANJANG TOTAL PANJANG

#REF!

overstek sambungan
PANJANG TOTAL PANJANG

- - -

0.007

- -

overstek sambungan
PANJANG TOTAL PANJANG

157.45 157.45
81.40 81.40
81.40 81.40
81.40 81.40

overstek sambungan
PANJANG TOTAL PANJANG

36.80 36.80
60.30 60.30
60.30 60.30
60.30 60.30
overstek sambungan

PANJANG TOTAL PANJANG


6.55 6.55
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

overstek sambungan

PANJANG TOTAL PANJANG


6.80 6.80
-
-
-
-

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk
overstek sambungan

PANJANG TOTAL PANJANG


5.15 5.15
-
-
-
tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi bekisting dikurangi karena sdh masuk bekisting sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

tinggi cor dikurangi karena sdh masuk cor sloof, balok dan ringbalk

overstek sambungan

PANJANG TOTAL PANJANG


4.50 4.50
1.85 1.85
2.60 2.60
overstek sambungan

PANJANG TOTAL PANJANG


5.00 5.00 2.50
- 2.50
- 2.50

overstek sambungan
PANJANG TOTAL PANJANG

152.25 152.25
140.10 140.10
140.10 140.10
140.10 140.10

335.95 -
-
-
-

- -
- -
- -
- -
overstek sambungan
PANJANG TOTAL PANJANG

152.25 1 153.25
- -
- -
- -
- -

- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
- -
- -
- -
- -

- -
- -
- -
- -
0.6 4 2.4
3.5 23 80.5
82.9
51.1493

2.6
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
-
-
-
-
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
luas Hbeam
2.10 - 0
2.40 - 0
2.40 - 0
2.40 - 0
0

-
-
-
-
luas WF
0.27 9.94 228.56
0.27 - -
228.56

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
m
33.35
kusen jeruji
0 0.4 -
0 0.4 -
0 0.4 -
- #REF! #REF!

0 0.4 0 #REF! #REF!


#REF!

#REF!

#REF!

#REF!

#REF!
6.05
9.7
15.00
-
-
15.00
ITEM PEMBAYARAN NO. : B.2.2 Analisa EI-322
JENIS PEKERJAAN : TIMBUNAN BIASA DARI SELAIN GALIAN SUMBER BAHAN
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN

No. URAIAN KODE KOEF. SATUAN KETERANGAN

I. ASUMSI
1 Pekerjaan dilakukan secara mekanis
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
5 Faktor pengembangan bahan Fk 1.20 -
6 Tebal hamparan padat t 0.20 M

II. URUTAN KERJA


1 Whell Loader memuat ke dalam Dump Truck
2 Dump Truck mengangkut ke lapangan dengan jarak
quarry ke lapangan L 3.00 Km
3 Material dihampar dengan menggunakan Motor Grader
4 Hamparan material disiram air dengan Watertank Truck
(sebelum pelaksanaan pemadatan) dan dipadatkan
dengan menggunakan Vibro Roller
5 Selama pemadatan sekelompok pekerja akan
merapikan tepi hamparan dan level permukaan
dengan menggunakan alat bantu

III. PEMAKAIAN BAHAN, ALAT DAN TENAGA


1. BAHAN
1.a. Bahan timbunan = 1 x Fk (M08) 1.20 M3 Borrow Pit

2. ALAT
2.a. WHELL LOADER (E15)
Kapasitas Bucket V 1.50 M3
Faktor Bucket Fb 0.90 -
Faktor Efisiensi Alat Fa 0.83 -
Waktu sklus Ts1 menit
- Muat T1 0.50 menit
- Lain-lain T2 0.50 menit
Ts1 1.00 menit

Kapasitas Produksi / Jam = V x Fb x Fa x 60 Q1 56.03 M3


Fk x Ts1

Koefisienalat / M3 = 1 : Q1 (E15) 0.0178 Jam

2.b. DUMP TRUCK (E08)


Kapasitas bak V 4.00 M3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata-rata bermuatan v1 25.00 KM/Jam
Kecepatan rata-rata kosong v2 40.00 KM/Jam
Waktusiklus : Ts2
- Waktu tempuh isi = (L : v1) x 60 T1 7.20 menit
- Waktu tempuh kosong = (L : v2) x 60 T2 4.50 menit
- Lain-lain T3 3.00 menit
Ts2 14.70 menit

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. : B.2.2 Analisa EI-322


JENIS PEKERJAAN : TIMBUNAN BIASA DARI SELAIN GALIAN SUMBER BAHAN
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

Kapasitas Produksi / Jam = V x Fa x 60 Q2 11.29 M3


Fk x Ts2

Koefisien Alat / M3 = 1 : Q2 (E08) 0.0886 Jam

2.c. MOTOR GRADER (E13)


Panjang hamparan Lh 50.00 M
Lebar Efektif kerja Blade b 2.40 M
Faktor Efisiensi Alat Fa 0.83 -
Kecepatan rata-rata alat v 5.00 Km / Jam
Jumlah lintasan n 5 lintasan
Waktu siklus Ts3
- Perataan 1 kali lintasan = Lh : (v x 1000) x 60 T1 0.60 menit
- Lain-lain T2 0.50 menit
Ts3 1.10 menit

Kapasitas Produksi / Jam = Lh x b x t x Fa x 60 Q3 217.31 M3


n x Ts3

Koefisien Alat / M3 = 1 : Q3 (E13) 0.0046 Jam

2.d. VIBRATOR ROLLER (E19)


Kecepatan rata-rata alat v 4.00 Km / Jam
Lebar efektif pemadatan b 1.20 M
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -

Kapasitas Prod./Jam = (v x 1000) x b x t x Fa Q4 132.80 M3


n

Koefisien Alat / M3 = 1 : Q4 (E19) 0.0075 Jam

2.e. WATER TANK TRUCK (E23)


Volume tangki air V 4.00 M3
Kebutuhan air / M3 material padat Wc 0.07 M3
Pengisian Tangki / jam n 1.00 kali
Faktor efisiensi alat Fa 0.83 - Baik

Kapasitas Produksi / Jam = V x n x Fa Q5 47.43 M3


Wc

Koefisien Alat / M3 = 1 : Q5 (E23) 0.0211 Jam

2.f. ALAT BANTU


Diperlukan alat-alat bantu kecil Lump Sump
- Sekop = 3 buah

Berlanjut ke halaman berikut

ITEM PEMBAYARAN NO. : B.2.2 Analisa EI-322


JENIS PEKERJAAN : TIMBUNAN BIASA DARI SELAIN GALIAN SUMBER BAHAN
SATUAN PEMBAYARAN : M3 URAIAN ANALISA HARGA SATUAN
Lanjutan

No. URAIAN KODE KOEF. SATUAN KETERANGAN

3. TENAGA
Produksi menentukan : WHELL LOADER Q1 56.03 M3/Jam
Produksi Timbunan / hari = Tk x Q1 Qt 392.18 M3
Kebutuhan tenaga :
- Pekerja P 4.00 orang
- Mandor M 1.00 orang

Koefisien tenaga / M3 :
- Pekerja = (Tk x P) : Qt (L01) 0.0714 Jam
- Mandor = (Tk x M) : Qt (L02) 0.0178 Jam

4. HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5. ANALISA HARGA SATUAN PEKERJAAN


Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :

Rp. 119,681.81 / M3
6. WAKTU PELAKSANAAN YANG DIPERLUKAN
Masa Pelaksanaan : 1.50 bulan

7. VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan : #REF! M3
Analisa EI-322

FORMULIR STANDAR UNTUK


PEREKAMAN ANALISA MASING-MASING HARGA SATUAN

PROGRAM :
KEGIATAN : #REF!
PEKERJAAN : #REF!
PROP / KAB / KODYA : SULAWESI TENGAH
ITEM PEMBAYARAN NO. : B.2.2 PERKIRAAN VOL. PEK. : #REF!
JENIS PEKERJAAN : TIMBUNAN BIASA DARI SELAIN GALIAN TOTAL HARGA (Rp.) : #REF!
SUMBER BAHAN % THD. BIAYA PROYEK : #REF!
SATUAN PEMBAYARAN : M3

PERKIRAAN HARGA JUMLAH


NO. KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)

A. TENAGA

1. Pekerja (L01) Jam 0.0714 100,000.00 7,139.67


2. Mandor (L02) Jam 0.0178 120,600.00 2,152.61

JUMLAH HARGA TENAGA 9,292.28

B. BAHAN

1. Bahan timbunan (M08) M3 1.2000 47,200.00 56,640.00

JUMLAH HARGA BAHAN 56,640.00

C. PERALATAN

1. Whell Loader Jam 0.0178 550,000.00 9,817.05


2. Dump Truck Jam 0.0886 300,000.00 26,566.27
3. Vibrator Roller Jam 0.0075 400,000.00 3,012.05
4. Motor Grader Jam 0.0046 500,000.00 2,300.87
5. Water Tanker Truck Jam 0.0211 400,000.00 8,433.73
6. Alat Bantu Ls 1.0000 3,500.00 3,500.00

JUMLAH HARGA PERALATAN 53,629.96

D. JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C ) 119,562.24


E. OVERHEAD & PROFIT 10% % x D 119.56
F. HARGA SATUAN PEKERJAAN ( D + E ) 119,681.81
Note: 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran berat untuk bahan-bahan.

2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran.

3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar dari kontrak)

dan biaya-biaya lainnya.


Sekop 3 50,000 150,000
ANALISA HARGA SATUAN
Lampiran A PEKERJAAN
KEGIATAN :
#REF!

PEKERJAAN : #REF!
SUMBER DANA : DAK
TAHUN ANGGARAN : 2022

K HARGA SATUAN PEKERJAAN AKHIR / LAIN-LAIN


0 K.01 1 Paket Penggandaan Buku / Laporan
No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
A -
JUMLAH TENAGA KERJA -
BAHAN
Foto Copy Kertas F4 Lbr 200.0000 200.00 40,000.00
B
Menjilid Buah 3.0000 3,500.00 10,500.00
JUMLAH HARGA BAHAN 50,500.00
PERALATAN
C -
JUMLAH HARGA ALAT -
D JUMLAH ( A + B + C) 50,500.00
E OVERHEAD & PROFIT ( RSL x D) #VALUE!
F HARGA SATUAN PEKERJAAN (D+E) #VALUE!

0 K.02 1 Set Foto Dokumentasi Menggunakan Kamera Digital


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
A Tukang Foto L.02 OH 0.3000 #REF! #REF!
JUMLAH TENAGA KERJA #REF!
BAHAN
B Foto Printing 3 R Lbr 10.0000 2,350.00 23,500.00
JUMLAH HARGA BAHAN 23,500.00
PERALATAN
C Kamera Digital Sewa 0.3000 25,000.00 7,500.00
JUMLAH HARGA ALAT 7,500.00
D JUMLAH ( A + B + C) #REF!
E OVERHEAD & PROFIT ( RSL x D) #REF!
F HARGA SATUAN PEKERJAAN (D+E) #REF!

0 K.03 1 Set Pembuatan As Built Drawing


No Uraian Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
TENAGA
A Drafter CAD OB 0.2000 2,000,000.00 400,000.00
JUMLAH TENAGA KERJA 400,000.00
BAHAN
Kertas HVS Lembar 0.0200 175.00 3.50
B Tinta Printer Dos 0.0500 45,000.00 2,250.00
B
Menjilid Buah 1.0000 3,500.00 3,500.00
JUMLAH HARGA BAHAN 5,753.50

PERALATAN
Sewa Komputer Unit 0.4000 90,000.00 36,000.00
C
Sewa Printer Unit 0.4000 35,000.00 14,000.00
JUMLAH HARGA ALAT 50,000.00
D JUMLAH ( A + B + C) 455,753.50
E OVERHEAD & PROFIT ( RSL x D) #VALUE!
F HARGA SATUAN PEKERJAAN (D+E) #VALUE!

0.00
0
-
MUHAMMAD TRIMUKTI, ST

#NAME?
#NAME?

Anda mungkin juga menyukai