A. UPAH KERJA
B. BAHAN
Page 1 of 89
40 Kran Air 3/4 " Bh Rp. 14,000.00
41 Kuas Cat Bh Rp. 15,000.00
42 Kunci Pintu ( Standar ) Bh Rp. 125,000.00
43 Kunci Pintu Biasa Bh Rp. 85,000.00
44 Lampu Hemat Energi 11 Watt Setara Hannochs Bh Rp. 30,000.00
45 Lampu Hemat Energi 18 Watt Setara Hannochs Bh Rp. 35,000.00
46 Lampu Hemat Energi 23 Watt Setara Hannochs Bh Rp. 75,000.00
47 Lem Kayu Kg Rp. 18,000.00
48 List Eternit Kayu M1 Rp. 7,000.00
49 Minyak Cat Liter Rp. 24,000.00
50 Minyak Bekisting Liter Rp. 7,500.00
51 Multipleks 3 mm Lembar Rp. 75,000.00
52 Multipleks 4 mm Lembar Rp. 85,000.00
53 Multipleks 6 mm Lembar Rp. 120,000.00
54 Multipleks 9 mm Lembar Rp. 140,000.00
55 Pacok Jendela Dan Ventilasi Pasang Rp. 7,500.00
56 Paku Asbes Kg Rp. 18,000.00
57 Paku Beton 8 Inci Kotak Rp. 19,000.00
58 Paku Kait Buah Rp. 1,000.00
59 Paku Kayu Kg Rp. 17,500.00
60 Paku Tripleks Kg Rp. 17,000.00
61 Paku Seng Kg Rp. 19,500.00
62 Papan Kayu Kelas II M3 Rp. 5,100,000.00
63 Paku Sumbat Buah Rp. 1,200.00
64 Paku Sekrup Kg Rp. 24,000.00
65 Pasir Btu (Sirtu ) - Matrial Jalan M3 Rp. 300,000.00
66 Pasir Beton / Kerikil M3 Rp. 132.14
67 Pasir Pasang Kg Rp. 125.00
68 Kerikil Kg Rp. 101.51
69 Pasir Urug M3 Rp. 85.71
70 Pelumaas / Oil Liter Rp. 35,000.00
71 Plamur Tembok Kg Rp. 30,000.00
72 Plamir Kayu Kg Rp. 24,500.00
73 Plin Keramik Buah Rp. 4,500.00
74 Plywood Tebal 9 mm Lembar Rp. 140,000.00
75 Residu Kg Rp. 10,000.00
76 Reservoid Air 500 Ltr Buah Rp. 1,200,000.00
77 Reservoid Air 1000 Ltr Buah Rp. 1,850,000.00
78 Reservoid Air 500 Ltr Stainless Steel Buah Rp. 2,000,000.00
79 Schakelar Buah Rp. 12,000.00
80 Semen @ 40 kg Zak Rp. 55,000.00
81 Semen Portlanf (PC) @ 40 kg Kg Rp. 1,375.00
82 Semen Putih @ 50 Kg Kg Rp. 220,000.00
83 Semen Warna Kg Rp. 4,400.00
84 Seng Genteng Metal M2 Rp. 65,000.00
85 Seng BJLS 0,20 Cat Pabrik M2 Rp. 47,500.00
86 Seng Gelombang BJLS 30 M2 Rp. 55,000.00
87 Seng Gelombang BJLS 30 Cat Pabrik M2 Rp. 60,000.00
88 Seng Plat BJLS 20 M2 Rp. 40,000.00
89 Seng Plat BJLS 30 M2 Rp. 55,000.00
90 Sekrup Fixer BUah Rp. 500.00
91 Sealant Kg Rp. 15,000.00
92 Sumur + Pompa Tangan terpasang Unit Rp. 1,750,000.00
93 Tanah Tibun M3 Rp. 65,000.00
94 Teralis Besi M2 Rp. 375,000.00
95 Titik Lampui + Instalasi Titik Rp. 150,000.00
96 Zakering Buah Rp. 300,000.00
97 Pemasangan Atap Baja Ringan M2 Rp. 275,000.00
98 Pipa PVC 3/4" Batang Rp. 47,900.00
99 Pipa PVC 3" Batang Rp. 245,900.00
100 Pipa PVC 4" Batang Rp. 282,800.00
C. BALAT
Page 2 of 89
Page 3 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 4 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 5 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 6 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 7 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan 1 M3 Pondasi Cyclopen 60% Camp 1Pc:2PB:3Kr 40% Batu Belah
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.10
Jenis Pekerjaan : Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2
Page 8 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5
Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6
Page 9 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Page 10 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8
Page 11 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 12 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 13 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 14 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 15 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7
Page 16 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7.a
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cmTebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9
Page 17 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 10 x 20 ) cm Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9.a
Page 18 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 19 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 20 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 21 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 22 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 23 of 89
F Harga Satuan Pekerjaan ( D + E ) 118,607.50
Page 24 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu Dan Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1
Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5
Page 25 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 26 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 27 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.22
Page 28 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 29 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 30 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 31 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 32 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4
Page 33 of 89
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10
Page 34 of 89
ANALISA HARGA SATUAN PEKERJAAN
Page 35 of 89
BILL OF QUANTITY (BOQ)
Harga Satuan Jumlah Harga
No. Uraian Volume Sat. Analisa
(Rp.) (Rp.)
1 2 3 4 5 6 7=(3x6)
I LANTAI I
A PEKERJAAN TANAH
Jumlah Rp 18,696,805.60
B PEKERJAAN PONDASI
Timbunan Pasir Bawah Pondasi Tapak 5.55 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 162,322.65
Timbunan Pasir Bawah Pondasi Menerus 3.07 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 89,779.32
Jumlah Rp 36,008,665.33
C PEKERJAAN STRUKTUR PONDASI
Pondasi Tapak tipe 1
Beton K-250 52.49 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 53,860,962.84
Besi Tulangan Pokok Ø 16 4139.92 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 71,810,595.25
Bekisting + Perawatan Beton 131.22 M³ AHSP PU A.4.1.1.20 Rp 262,372.00 Rp 34,428,453.84
jumlah Rp 160,100,011.93
Pondasi Tapak tipe 2
Beton K-250 4.85 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 4,978,916.93
Besi Tulangan Pokok Ø 14 234.40 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 4,065,887.77
Bekisting + Perawatan Beton 9.70 M³ AHSP PU A.4.1.1.20 Rp 262,372.00 Rp 2,546,057.89
jumlah Rp 11,590,862.59
Pondasi Menerus
Pas Batu kosong 8.88 M³ AHSP PU A.3.2.1.9 Rp 373,798.73 Rp 3,319,332.74
Pas batu gunung 22.743 M³ AHSP PU A.3.2.1.2 Rp 739,959.00 Rp 16,828,887.54
Timbunan 15.293 M³ AHSP PU A.2.3.1.11.a Rp 114,950.00 Rp 1,757,930.35
jumlah Rp 21,906,150.62
Total keseluruhan Rp 193,597,025.14
D PEKERJAAN BETON LANTAI 1
Sloof (25/40)
Beton K-250 7.22 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 7,408,858.25
Besi Tulangan Pokok Ø 16 797.64 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 13,835,826.97
Besi Tulangan Sengkang Ø 8 3279.31 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 56,882,543.64
Besi Tulangan Pinggang Ø 14 174.48 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,026,587.15
Bekisting + Perawatan Beton 28.88 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 2,729,612.45
jumlah Rp 83,883,428.46
Sloof (20/30)
Beton K-250 4.068 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 4,174,409.33
Besi Tulangan Pokok Ø 16 535.02 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 9,280,461.70
Besi Tulangan Sengkang Ø 8 227.84 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,952,084.62
Besi Tulangan Pinggang Ø 14 163.85 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,842,141.40
Bekisting + Perawatan Beton 20.34 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 1,922,448.66
jumlah Rp 22,171,545.70
Sloof (25/40)
Beton K-250 13.26 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 13,606,850.47
Besi Tulangan Pokok Ø 16 1464.92 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 25,410,396.90
Besi Tulangan Sengkang Ø 8 6022.66 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 104,468,494.27
Besi Tulangan Pinggang Ø 14 320.45 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 5,558,524.32
Bekisting + Perawatan Beton 53.04 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 5,013,110.96
jumlah Rp 154,057,376.92
Kolom K1 (35/35)
Beton K-250 16.07 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 16,492,405.78
Besi Tulangan Pokok Ø 14 1268.27 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 21,999,348.15
Besi Tulangan Sengkang Ø 8 435.97 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 7,562,275.93
Besi Tulangan Pinggang Ø 14 634.14 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,999,674.07
Bekisting + Perawatan Beton 91.84 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 14,645,418.67
jumlah Rp 71,699,122.60
Kolom K2 (30/60)
Beton K-250 23.62 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 24,233,739.11
Besi Tulangan Pokok Ø 14 951.21 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 16,499,511.11
Besi Tulangan Sengkang Ø 14 584.23 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,134,067.07
Besi Tulangan Pinggang Ø 14 1268.27 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 21,999,348.15
Bekisting + Perawatan Beton 118.08 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 18,829,824.00
jumlah Rp 91,696,489.44
Kolom K4 (13/13)
Beton K-250 2.77 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 2,842,456.70
Besi Tulangan Pokok Ø 14 582.03 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,095,909.92
Besi Tulangan Sengkang Ø 8 159.73 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,770,693.48
Bekisting + Perawatan Beton 42.62 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 6,795,733.33
jumlah Rp 22,504,793.43
Total Keseluruhan` Rp 684,542,242.27
E PEKERJAAN PASANAGAN DAN PLASTERAN
a. Pasangan Dinding 1/2 Bata 1:2 144.60 M³ AHSP PU A.4.4.1.7 Rp 121,261.00 Rp 17,534,340.60
b. Pasangan Dinding 1/2 Bata 1:4 604.28 M³ AHSP PU A.4.4.1.9 Rp 111,017.88 Rp 67,085,881.51
c. Pasangan Dinding 1/2 Bata 1:2 (Selasar) 10.43 M³ AHSP PU A.4.4.1.7 Rp 121,261.00 Rp 1,264,752.23
d. Plasteran 1:2 selasar 20.86 M³ AHSP PU A.4.4.2.2 Rp 65,296.55 Rp 1,362,086.03
e. Plasteran 1:4 577.47 M³ AHSP PU A.4.4.2.4 Rp 59,271.30 Rp 34,227,397.61
jumlah Rp 121,474,457.98
F PLAT LANTAI
Beton K-250 30.83 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 31,636,440.41
Pembesian Tulangan Pokok Ø 12 4,208.66 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 73,003,081.53
Bekisting + Perawatan Beton 308.30 M³ AHSP PU A.4.1.1.24 Rp 371,800.00 Rp 114,625,940.00
jumlah Rp 219,265,461.94
G PLAT TANGGA
Beton K - 175 1.63 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 1,543,936.55
Pembesian Tulangan Pokok Ø 12 222.51 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,859,715.31
Bekisting + Perawatan 16.30 M² AHSP PU A.4.1.1.26 Rp 188,562.50 Rp 3,073,568.75
Anak Tangga
Beton K - 175 1.42 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 1,345,024.48
Pembesian Tulangan Ø 12 193.85 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,362,451.37
Bekisting + Perawatan 14.20 M³ AHSP PU A.4.1.1.26 Rp 188,562.50 Rp 2,677,587.50
jumlah Rp 15,862,283.96
H BALOK BORDES 18/25
Beton K-175 0.09 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 85,248.03
Pembesian Tulangan Pokok Ø 12 7.10 M³ AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 123,191.97
Pembesian Tulangan Sengkang Ø 8 4.31 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 74,783.69
Bekisting + Perawatan 0.86 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 141,591.83
Plat Bordes
Beton K-175 0.60 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 568,320.20
Pembesian Tulangan Pokok Ø 12 81.91 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 1,420,754.10
Bekisting + Perawatan 6.00 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 987,850.00
jumlah Rp 3,401,739.82
I PEKERJAAN TANGGA DEPAN
a. Galian Tanah 16.98 M³ AHSP PU A.2.3.1.1 Rp 72,875.00 Rp 1,237,417.50
b. Beton cor 0.73 M³ AHSP PU A.4.1.1.2 Rp 879,561.41 Rp 642,079.83
c. Urugan pasir Tangga Depan 7.05 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 206,305.16
d. Pasir Alas 0.36 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 10,534.73
jumlah Rp 2,096,337.22
I PEKERJAAN PLAFOND
a. plafond Gypsum Tebal 9 mm 274.42 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 17,441,586.36
b. plafond selasar 29.04 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 1,845,724.32
c. Rangka plafond 303.46 M² Taksir Rp 80,000.00 Rp 24,276,800.00
c. List profil Gypsum 303.46 M² Taksir Rp 7,000.00 Rp 2,124,220.00
jumlah Rp 45,688,330.68
J PEKERJAAN PENGECATAN
a. Cat Dinding 577.47 M² AHSP PU A.4.7.1.10 Rp 28,089.60 Rp 16,220,901.31
b. Cat plafond 303.46 M² Taksir Rp 22,000.00 Rp 6,676,120.00
jumlah Rp 22,897,021.31
K PEKERJAAN KUSEN
Kusen pintu tipe 1 ( 2 unit) 0.13 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,210,237.88
Daun pintu tipe 1 5.46 M² Taksir Rp 735,900.00 Rp 4,018,014.00
Kusen pintu tipe 2 ( 2 unit) 0.12 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,181,422.69
Daun pintu tipe 2 5.04 M² Taksir Rp 735,900.00 Rp 3,708,936.00
Kusen pintu tipe 3 ( 7 unit) 0.37 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 3,505,847.81
Daun pintu tipe 3 12.94 M² Taksir Rp 735,900.00 Rp 9,519,602.40
Kusen pintu tipe 4 ( 11 unit) 0.42 M² Taksir Rp 250,000.00 Rp 105,000.00
Daun pintu tipe 4 Aluminium 16.17 M² Taksir Rp 3,500,000.00 Rp 56,595,000.00
Kusen jendela tipe J1 (4 unit) 0.23 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 2,170,744.13
Daun jendela tipe 1 6.10 M² Taksir Rp 541,860.00 Rp 3,306,429.72
Kusen jendela tipe J2 (11 unit) 0.33 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 3,208,090.88
Daun jendela tipe J2 7.43 M² Taksir Rp 541,860.00 Rp 4,023,310.50
Kusen jendela tipe J3 (1 unit) 0.06 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 576,303.75
Daun jendela tipe J3 0.76 M² Taksir Rp 541,860.00 Rp 412,897.32
Kusen jendela tipe J4 (1 unit) 0.03 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 326,572.13
Kusen pintu/jendela tipe PJ1 (2 unit) 0.19 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,863,382.13
Daun pintu/jendela tipe PJ1 19.94 M² Taksir Rp 541,860.00 Rp 10,801,979.10
Kusen ventilasi tipe V1 (9 unit) 0.15 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 107,933.21
Daun Ventilasi Kaca T 8 2.25 M² Taksir Rp 541,860.00 Rp 1,219,185.00
Kusen ventilasi tipe V2 ( 1 unit) 0.07 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 51,163.15
Daun Ventilasi Kaca T 8 0.85 M² Taksir Rp 541,860.00 Rp 460,581.00
Kusen ventilasi tipe V3 (3 unit) 0.07 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 45,556.23
jumlah Rp 108,418,189.00
F [EKERJAAN KERAMIK
a. Lantai Keramik 20x20 (KM/WC) 33.90 M² Taksir Rp 36,900.00 Rp 1,250,910.00
b. Dinding 20x25 (KM/WC) 19.76 M² Taksir Rp 47,000.00 Rp 928,720.00
c. Lantai 40x40 529.21 M² AHSP PU A.4.4.3.35.c Rp 238,812.89 Rp 126,382,168.19
Jumlah Rp 128,561,798.19
G PEKERJAAN PENGECATAN
a. Cat Dinding 567.23 M² AHSP PU A.4.7.1.10 Rp 28,089.60 Rp 15,933,263.81
b. Cat Plafond 361.03 M² Taksir Rp 22,000.00 Rp 7,942,660.00
Jumlah Rp 23,875,923.81
H PEKERJAAN ATAP
a. Rangka Kuda-Kuda kayu 7.38 M³ Taksir Rp 9,714,675.00 Rp 71,665,157.48
b. Atap seng Genteng 386.13 M² AHSP PU A.4.5.2.32 Rp 109,450.00 Rp 42,261,928.50
c. Rabung seng genteng 42.98 M 1 AHSP PU A.4.5.2.36 Rp 118,607.50 Rp 5,097,750.35
d. Lisplank 3/30 83 M1 AHSP PU A.4.6.1.22 Rp 98,230.00 Rp 8,153,090.00
Jumlah Rp 127,177,926.33
K PEKERJAAN SANITASI
a. Kolset Duduk Keramik 8.00 bh AHSP PU A.5.1.1.2 Rp 692,251.25 Rp 5,538,010.00
b. Bak mandi fibre 8.00 bh AHSP PU A.5.1.1.10 Rp 589,100.00 Rp 4,712,800.00
c. Kran air 14.00 bh AHSP PU A.4.5.1.19 Rp 27,550.00 Rp 385,700.00
d. Floor drain 8.00 bh AHSP PU A.4.5.1.1.14 Rp 33,550.00 Rp 268,400.00
e. Wastefel 6.00 bh Taksir Rp 1,043,000.00 Rp 6,258,000.00
f. Pipa leiding (Ø 3/4) 18.40 M AHSP PU A.5.1.1.26 Rp 88,178.00 Rp 1,622,475.20
g. Pipa PVC (Ø 4) 60.00 M AHSP PU A.5.1.1.32 Rp 161,455.00 Rp 9,687,300.00
Jumlah Rp 28,472,685.20
1
Rp 193,597,025.14
Rp 446,012,756.54
Rp 925,168,065.21
Rp 238,812.89
Rp 238,812.89
Rp 50,000.00
Rp 320,812,888.63
LANJUTAN
Rp 128,561,798.19
64,280,899.10
AHSP PU A.4.4.3.35
lanjutan
228,000.00
Rp 6,138,000.00
3,340,000.00
REKAPITULASI BILL OF QUANTITY
Jumlah Harga
No. Uraian %
(Rp.)
1 2 3 4.00
PEKERJAAN PERSIAPAN Rp 18,696,805.60 0.78
PEKERJAAN TANAH Rp 36,008,665.33 1.50
I LANTAI I
II LANTAI II
Terbilang : DUA MILYAR ENAM RATUS EMPAT PULUH DELAPAN JUTA DUA RATUS TUJUH BELAS RIBU RUPIAH
ANALISA TEKNIS
V 557.27
Durasi Pelaksanaan (D) = = = 2.09 = 2 hari
nxP 40 x 6.67
V 91.58
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 18 x 4.65
B. PEKERJAAN TANAH
1. Galian Tanah Pondasi Tapak AHSP PU A.2.3.1.2
Volume (V) = 193.88 m³
Jumlah Tenaga Kerja (n) = 58 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.945
1 1 1.06 m³/org/hari
Produktifitas = = =
N 0.945
V 193.88
Durasi Pelaksanaan (D) = = = 3.16 = 3 hari
nxP 58 x 1.06
V 145.40
Durasi Pelaksanaan (D) = = = 2.11 = 2 hari
nxP 23 x 3.00
4. Urugan Kembali Galian Pondasi Menerus AHSP PU A.2.3.1.9
Volume (V) = 15.29 m³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.333
1 1
Produktifitas = = = 3.00 m³/org/hari
N 0.333
V 15.29
Durasi Pelaksanaan (D) = = = 1.02 = 1 hari
nxP 5 x 3.00
V 11.09
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 12 x 0.80
V 8.88
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.80
1 1
Produktifitas = = = 3.2258065 m³/org/hari
N 0.310
V 5.55
Durasi Pelaksanaan (D) = = = 0.86 = 1 hari
nxP 2 x 3.23
1 1
Produktifitas = = = 3.2258065 m³/org/hari
N 0.310
V 3.07
Durasi Pelaksanaan (D) = = = 0.95 = 1 hari
nxP 1 x 3.23
V 52.49
Durasi Pelaksanaan (D) = = = 2.14 = 2 hari
nxP 50 x 0.49
V 4139.92
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 30 x 66.67
V 131.22
Durasi Pelaksanaan (D) = = = 2.10 = 2 hari
nxP 52 x 1.20
V 4.85
Durasi Pelaksanaan (D) = = = 1.23 = 1 hari
nxP 8 x 0.49
V 234.40
Durasi Pelaksanaan (D) = = = 1.17 = 1 hari
nxP 3 x 66.67
Pemasangan Bekisting Pondasi + Perawatan Beton AHSP PU A.4.1.1.20
Volume (V) = 9.70 m²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832
V 9.70
Durasi Pelaksanaan (D) = = = 1.01 = 1 hari
nxP 8 x 1.20
D. PEKERJAAN BETON
1. Sloof 25/40 AHSP PU A.4.1.1.8
Beton K-250
Volume (V) = 7.22 m3
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036
V 7.22
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 13 x 0.49
V 797.64
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 12 x 66.67
V 3279.31
Durasi Pelaksanaan (D) = = = 2.0 = 2 hari
nxP 25 x 66.67
V 174.48
Durasi Pelaksanaan (D) = = = 0.87 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 28.88 m²
Jumlah Tenaga Kerja (n) = 23 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832
V 28.88
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 23 x 1.20
V 4.07
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 8 x 0.49
V 535.02
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 7 x 66.67
V 227.84
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 3 x 66.67
V 163.85
Durasi Pelaksanaan (D) = = = 0.82 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 20.34 m²
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832
V 20.34
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 15 x 1.20
V 13.26
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 25 x 0.49
V 1464.92
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 20 x 66.67
V 6022.66
Durasi Pelaksanaan (D) = = = 2.9 = 3 hari
nxP 31 x 66.67
V 320.45
Durasi Pelaksanaan (D) = = = 1.20 = 1 hari
nxP 4 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 53.04 m3
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832
V 53.04
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 40 x 1.20
V 16.07
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 30 x 0.49
V 1268.27
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 18 x 66.67
V 435.97
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 6 x 66.67
V 634.14
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 9 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.22
Volume (V) = 91.84 m3
Jumlah Tenaga Kerja (n) = 45 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056
V 91.84
Durasi Pelaksanaan (D) = = = 2.16 = 2 hari
nxP 45 x 0.95
V 23.62
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 23 x 0.49
V 951.21
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 13 x 66.67
V 584.23
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 8 x 66.67
V 1268.27
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 18 x 66.67
Bekisting Perawatan Beton AHSP PU A.4.1.1.22
Volume (V) = 118.08 m3
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056
V 118.08
Durasi Pelaksanaan (D) = = = 3.12 = 3 hari
nxP 40 x 0.95
V 2.77
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 5 x 0.49
V 582.03
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 8 x 66.67
V 159.73
Durasi Pelaksanaan (D) = = = 0.80 = 1 hari
nxP 3 x 66.67
V 42.62
Durasi Pelaksanaan (D) = = = 1.18 = 1 hari
nxP 38 x 0.95
7. Pelat Lantai AHSP PU A.4.1.1.8
Beton K-250
Volume (V) = 30.83 m3
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036
V 4208.66
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 30 x 66.67
V 308.30
Durasi Pelaksanaan (D) = = = 5.2 = 5 hari
nxP 63 x 0.95
V 1.63
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 3 x 0.49
V 222.51
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.26
Volume (V) = 16.30 m2
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056
V 16.30
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 15 x 0.95
V 1.42
Durasi Pelaksanaan (D) = = = 0.96 = 1 hari
nxP 3 x 0.49
V 193.85
Durasi Pelaksanaan (D) = = = 0.97 = 1 hari
nxP 3 x 66.67
V 0.09
Durasi Pelaksanaan (D) = = = 0.2 = 1 hari
nxP 1 x 0.49
Besi Tulangan Pokok Ø 12 AHSP PU A.4.1.1.17
Volume (V) = 7.10 kg
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015
V 7.10
Durasi Pelaksanaan (D) = = = 0.11 = 1 hari
nxP 1 x 66.67
V 4.31
Durasi Pelaksanaan (D) = = = 0.06 = 1 hari
nxP 1 x 66.67
V 0.86
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 1 x 0.95
V 0.60
Durasi Pelaksanaan (D) = = = 1.22 = 1 hari
nxP 1 x 0.49
V 81.91
Durasi Pelaksanaan (D) = = = 1.23 = 1 hari
nxP 1 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.23
Volume (V) = 6.00 m²
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056
V 6.00
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 6 x 0.95
V 144.60
Durasi Pelaksanaan (D) = = = 2.0 = 2 hari
nxP 31 x 2.35
V 10.43
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 4 x 2.35
V 604.28
Durasi Pelaksanaan (D) = = = 4.08 = 4 hari
nxP 63 x 2.35
V 20.86
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 9 x 2.08
e. Pelasteran 1Pc : 4Ps AHSP PU A.4.4.2.4
Volume (V) = 577.47 m²
Jumlah Tenaga Kerja (n) = 65 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.480
1 1
Produktifitas = = = 2.08 m²/org/hari
N 0.480
V 577.47
Durasi Pelaksanaan (D) = = = 4.3 = 4 hari
nxP 65 x 2.08
V
Durasi Pelaksanaan (D) = = = 0.00 = 1 hari
nxP 13 x 1.29
V 0.73
Durasi Pelaksanaan (D) = = = 0.74 = 1 hari
nxP 2 x 0.49
V 7.05
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 2 x 3.23
V 0.36
Durasi Pelaksanaan (D) = = = 0.1 = 1 hari
nxP 1 x 3.23
V 274.42
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 38 x 6.25
V 29.04
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 4 x 6.25
H. PEKERJAAN KUSEN
a. Kusen Pintu tipe 1 (2 unit) AHSP PU A.4.6.1.1
Volume = 0.13 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450
V 0.13
Durasi Pelaksanaan (D) = = = 0.96 = 1 hari
nxP 4 x 0.03
Daun pintu 1 Taksir
Volume = 5.46 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
V 0.12
Durasi Pelaksanaan (D) = = = 0.94 = 1 hari
nxP 4 x 0.03
V 0.37
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.03
V 0.23
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 6 x 0.03
V 6.10
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 20 x 0.29
V 0.33
Durasi Pelaksanaan (D) = = = 1.02 = 1 hari
nxP 10 x 0.03
V 7.43
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 25 x 0.29
V 0.06
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 2 x 0.03
V 0.03
Durasi Pelaksanaan (D) = = = 0.002 = 1 hari
nxP 1 x 0.03
V 0.19
Durasi Pelaksanaan (D) = = = 0.03 = 1 hari
nxP 1 x 7.30
V 0.15
Durasi Pelaksanaan (D) = = = 0.49 = 1 hari
nxP 1 x 0.31
V 0.07
Durasi Pelaksanaan (D) = = = 0.23 = 1 hari
nxP 1 x 0.31
V 0.07
Durasi Pelaksanaan (D) = = = 0.22 = 1 hari
nxP 1 x 0.31
V 529.21
Durasi Pelaksanaan (D) = = = 9.88 = 10 hari
nxP 60 x 0.89
d Keramik 40 x 40 Unpolisshed (Selasar) AHSP PU A.4.4.3.35.c
Volume = 25.89 M²
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120
V 25.89
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 25 x 0.89
V 19.40
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 35 x 0.49
V 1875.34
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 25 x 66.67
V 589.78
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 8 x 66.67
Besi Pinggang Polos Ø 2 - 16 AHSP PU A.4.1.1.17
Volume = 937.67 M³
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015
V 937.67
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 13 x 66.67
V 67.84
Durasi Pelaksanaan (D) = = = 2.05 = 2 hari
nxP 35 x 0.95
V 3.03
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 6 x 0.49
V 244.08
Durasi Pelaksanaan (D) = = = 0.92 = 1 hari
nxP 4 x 66.67
V 126.99
Durasi Pelaksanaan (D) = = = 0.95 = 1 hari
nxP 2 x 66.67
Besi Pinggang Polos Ø 12 AHSP PU A.4.1.1.17
Volume = 71.73 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015
V 71.73
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 1 x 66.67
V 12.32
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 12 x 0.95
V 5.41
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 10 x 0.49
V 640.61
Durasi Pelaksanaan (D) = = = 1.07 = 1 hari
nxP 9 x 66.67
V 392.27
Durasi Pelaksanaan (D) = = = 1.18 = 1 hari
nxP 5 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.23
Volume = 63.14 M³
Jumlah Tenaga Kerja (n) = 30 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056
V 63.14
Durasi Pelaksanaan (D) = = = 2.22 = 2 hari
nxP 30 x 0.95
b Kolom k1 35/35
Beton K-250 AHSP PU A.4.1.1.8
Volume = 9.60 M³
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036
V 9.60
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 18 x 0.49
V 757.56
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 11 x 66.67
V 260.41
Durasi Pelaksanaan (D) = = = 0.98 = 1 hari
nxP 4 x 66.67
V 378.78
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 5 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.22
Volume = 54.86 M³
Jumlah Tenaga Kerja (n) = 28 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056
V 54.86
Durasi Pelaksanaan (D) = = = 2.07 = 2 hari
nxP 28 x 0.95
V 3.20
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 6 x 0.49
V 580.00
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 8 x 66.67
V 137.05
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 2 x 66.67
V 193.33
Durasi Pelaksanaan (D) = = = 0.97 = 1 hari
nxP 3 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.22
Volume = 32.0 M³
Jumlah Tenaga Kerja (n) = 32 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056
V 32.00
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 32 x 0.95
V 1.37
Durasi Pelaksanaan (D) = = = 0.93 = 1 hari
nxP 3 x 0.49
V 287.87
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 4 x 66.67
V 79.00
Durasi Pelaksanaan (D) = = = 1.19 = 1 hari
nxP 1 x 66.67
V 21.08
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 20 x 0.95
e Reng Balok (20/30)
Beton K-250 AHSP PU A.4.1.1.8
Volume = 12.28 M³
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036
V 12.28
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 25 x 0.49
V 908.47
Durasi Pelaksanaan (D) = = = 1.05 = 1 hari
nxP 13 x 66.67
V 687.78
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 10 x 66.67
V 363.39
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 5 x 66.67
V 57.31
Durasi Pelaksanaan (D) = = = 2.16 = 2 hari
nxP 28 x 0.95
f Reng Balok (15/20)
Beton K-250 AHSP PU A.4.1.1.8
Volume = 2.03 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036
V 2.03
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 4 x 0.49
V 240.29
Durasi Pelaksanaan (D) = = = 1.20 = 1 hari
nxP 3 x 66.67
V 147.14
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 2 x 66.67
V 10.49
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.95
V 580.00
Durasi Pelaksanaan (D) = = = 5.03 = 5 hari
nxP 49 x 2.35
b. Plasteran AHSP PU A.4.4.2.4
Volume = 567.23 M³
Jumlah Tenaga Kerja (n) = 54 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.480
1 1
Produktivitas = = = 2.08 m²/org/hari
N 0.480
V 567.23
Durasi Pelaksanaan (D) = = = 5.04 = 5 hari
nxP 54 x 2.08
V 0.06
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 2 x 0.03
V 0.18
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 5 x 0.03
V 0.37
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 10 x 0.03
Daun Pintu tipe3
Volume (V) = 12.94 M²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
V 0.34
Durasi Pelaksanaan (D) = = = 0.18 = 1 hari
nxP 1 x 1.93
V 0.17
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 5 x 0.03
V 0.30
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 8 x 0.03
Daun Pintu tipe J2
Volume (V) = 7.43 0
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
V 0.12
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 4 x 0.03
V 0.04
Durasi Pelaksanaan (D) = = = 1.22 = 1 hari
nxP 1 x 0.03
V 0.15
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 4 x 0.03
D PEKERJAAN PLAFOND
a. Rangka plafond AHSP PU A.4.6.1.20
Volume = 303.46 M²
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.540
1 1
Produktivitas = = = 1.85 m²/org/hari
N 0.540
V 303.46
Durasi Pelaksanaan (D) = = = 3.09 = 3 hari
nxP 53 x 1.85
b. Plafond Multyplek 4mm AHSP PU A.4.5.1.7
Volume = 786.24 M²
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.160
1 1
Produktivitas = = = 6.25 m²/org/hari
N 0.160
V 786.24
Durasi Pelaksanaan (D) = = = 3.14 = 3 hari
nxP 40 x 6.25
V 16.80
Durasi Pelaksanaan (D) = = = 0.90 = 1 hari
nxP 3 x 6.25
V 11.76
Durasi Pelaksanaan (D) = = = 0.64 = 1 hari
nxP 2 x 9.26
E PEKERJAAN KERAMIK
a. Lantai Keramik 20 x20 (KM/WC) AHSP PU A.4.4.3.36
Volume = 33.90 M²
Jumlah Tenaga Kerja (n) = 35 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120
V 33.90
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 35 x 0.89
b. Dinding 20 x 25 (KM/WC)
Volume (V) = 19.76 M²
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
c. Lantai 40x40 AHSP PU A.4.4.3.34.a
Volume = 529.21 M²
Jumlah Tenaga Kerja (n) = 60 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120
V 529.21
Durasi Pelaksanaan (D) = = = 9.88 = 10 hari
nxP 60 x 0.89
F PEKERJAAN PENGECATAN
a. Cat Dinding AHSP PU A.4.7.1.10
Volume = 567.23 M²
Jumlah Tenaga Kerja (n) = 45 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.092
1 1
Produktivitas = = = 10.89 m²/org/hari
N 0.092
V 567.23
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 45 x 10.89
b. Cat Plafond
Volume (V) = 361.00 M²
Jumlah Tenaga Kerja (n) = 20 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
G PEKERJAAN ATAP
a Rangka Kuda-Kuda kayu AHSP PU A.4.6.1.14
Volume = 7.38 M³
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 29.145
1 1
Produktivitas = = = 0.03 m²/org/hari
N 29.145
V 7.38
Durasi Pelaksanaan (D) = = = 4.06 = 4 hari
nxP 53 x 0.03
V 386.13
Durasi Pelaksanaan (D) = = = 2.18 = 2 hari
nxP 55 x 3.22
c. Rambung Genteng AHSP PU A.4.5.2.39.a
Volume = 42.98 M1
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.247
1 1
Produktivitas = = = 4.05 m²/org/hari
N 0.247
V 42.98
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 10 x 4.05
V 83.00
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 25 x 3.08
V 108.00
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 18 x 5.53
b. Kunci Pintu
Volume (V) = 48.00 bh
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
c. Pegangan Pintu
Volume (V) = 48.00 bh
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
d. Engsel Jendela AHSP PU A.4.6.2.6
Volume = 89.00 bh
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.181
1 1
Produktivitas = = = 5.53 m²/org/hari
N 0.181
V 89.00
Durasi Pelaksanaan (D) = = = 1.07 = 1 hari
nxP 15 x 5.53
V 57.00
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 28 x 1.79
V 57.00
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 10 x 5.53
b. Saklar 2 arah
Volume (V) = 18.00 bh
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
c. Saklar 3 arah
Volume (V) = 3.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
2 Pekerjaan instalasi lampu
a. TL 2x36 W Louver in Bow Mark philip
Volume (V) = 14.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
b. PL 18 W
Volume (V) = 12.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
e. XL Philip 18 W
Volume (V) = 9.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
c. Kabel input
Volume (V) = 2.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
V 14.00
Durasi Pelaksanaan (D) = = = 0.88 = 1 hari
nxP 2 x 8.00
V 8.00
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 1 x 8.00
e. Wastafel
Volume (V) = 6.00 bh
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
f. Pipa leiding (Ø 4)
Volume (V) = 18.40 M
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
g. Pipa PVC ( Ø 4)
Volume (V) = 60.00 M
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
PEKERJAAN LANTAI 1
A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan m² 557.27 2 Hari
2. Pemasangan Bouwplank m¹ 91.58 1 Hari
JUMLAH 3 Hari
B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak m³ 193.880 3 Hari
2 Galian Tanah Pondasi Menerus m³ 61.17 1 Hari
3 Urugan Kembali Galian Pondasi Tapak m³ 145.40 2 Hari
4 Urugan Kembali Galian Pondasi Menerus m³ 15.29 1 Hari
5 Pasangan Batu Kosong Pondasi Tapak m³ 11.09 1 Hari
6 Pasangan Batu Kosong Pondasi Menerus m³ 8.88 1 Hari
7 Timbunan Pasir Bawah Pondasi Tapak m³ 5.55 1 Hari
8 Timbunana Pasir Bawah Pondasi Menerus m³ 3.07 1 Hari
JUMLAH 11 Hari
JUMLAH 57 Hari
E PEKERJAAN PASANGAN DAN PELASTERAN
Pasangan Dinding 1/2 Bata 1Pc : 2Ps m2 144.60 2 Hari
Pasangan Dinding 1/2 Bata 1Pc : 2Ps Selasar m² 10.43 1 Hari
Pasangan Dinding 1/2 Bata 1Pc :4Ps m2 604.28 4 Hari
Pelasteran 1Pc : 2P m² 20.86 1 Hari
Pelasteran 1Pc : 4Ps m² 577.47 4 Hari
JUMLAH 12 Hari
F PEKERJAAN TANGGA DEPAN
Galian Tanah m³ 16.98 1 Hari
Beton K-125 m3 0.73 1 Hari
Urugan pasir Tangga Depan m3 7.05 1 Hari
Pasair Alas m3 0.36 1 Hari
JUMLAH 4 Hari
G 0
Rangka Pelafond 0.00 0.00 2 Hari
Pelafond Tripleks 4 mm 0.00 0.00 1 Hari
Pelafond Selasar Tripleks 4 mm 0.00 0.00 1 Hari
List Pelafond 0.00 0.00 1 Hari
JUMLAH 5 Hari
H 0
a 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
b 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
c 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
d 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
e 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
f 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
g 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
h 0 0.00 0.00 1 Hari
i 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
j 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
k 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
l 0 0.00 0.00 1 Hari
JUMLAH 22 Hari
I 0
0 0 0.00 1 Hari
0 0 0.00 1 Hari
0 0 0.00 7 Hari
0 0 0.00 1 Hari
0 0 0.00 1 Hari
JUMLAH 11 Hari
#NAME?
A. #NAME?
1 0
0 m3 0.00 1 Hari
0 kg 0.00 1 Hari
0 kg 0.00 1 Hari
0 m3 0.00 1 Hari
2 0
0 m3 0.00 1 Hari
0 kg 0.000 2 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari
3 0
0 m3 1 `
0 kg 1 Hari
0 kg 1 Hari
0 kg 1 Hari
0 m3 1 Hari
4 0
0 m3 0.000 1 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari
5 0
0 m3 0.000 1 Hari
0 kg 0.000 2 Hari
0 kg 0.000 2 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari
6 0
0 m3 0.000 1 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari
JUMLAH 30 Hari
B 0
0 m3 0.000 3 Hari
0 m3 0.000 3 Hari
JUMLAH 6 Hari
C 0
a 0 0 0.000 1 Hari
0 0 0.000 1 Hari
b 0 0 0.000 1 Hari
0 0 0.000 1 Hari
c 0 0 0.000 1 Hari
0 0 0.000 1 Hari
d 0 0 0.000 1 Hari
0 0 0.000 1 Hari
e 0 0 0.000 1 Hari
0 0 0.000 1 Hari
f 0 0 0.000 1 Hari
0 0 0.000 1 Hari
g 0.00 0 0.000 1 Hari
0 0 0.000 1 Hari
h 0 0 0.000 1 Hari
i 0 0 0.000 1 Hari
JUMLAH 16 Hari
D 0
0 0 0.00 2 Hari
0 0 0.00 2 Hari
0 0 0.00 1 Hari
0 0 0.00 1 Hari
JUMLAH 6 Hari
E 0
0 0 0.000 1 Hari
0 0 0.000 1 Hari
0 0 0.000 7 Hari
JUMLAH 9 Hari
F 0
0 0 0.000 1 Hari
0 0 0.000 1 Hari
JUMLAH 2 Hari
G 0
0 0 0.000 3 Hari
0 0 0.000 1 Hari
0 0 0.000 1 Hari
0 0 0.000 1 Hari
JUMLAH 6 Hari
H 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
JUMLAH 6 Hari
III PEKERJAAN ELEKTRIKAL Lantai I Dan II
a 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
b 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
c 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
JUMLAH 11 Hari
IV PEKERJAAN SANITASI Lantai I Dan II
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 M 0.000 1
0 M 0.000 1
JUMLAH 7 Hari
25.108
23.862
BULAN IV
14 15 16
121.715
14.209
PERHITUNGAN JUMLAH MATERIAL / BAH
MATERIAL / BAHAN