DAFTAR HARGA UPAH DAN BAHAN

No. Uraian Satuan Harga Satuan

A. UPAH KERJA

1 Mandor Oh Rp. 100,000.00


2 Kepala Tukang Oh Rp. 120,000.00
3 Tukang Oh Rp. 110,000.00
4 Pekerja Oh Rp. 85,000.00

B. BAHAN

1 Air Liter Rp. 120.00


2 Batu Bata Buah Rp. 800.00
3 Batu Kali / Batu Belah (Sungai / Gunung ) M3 Rp. 185,000.00
4 Batu Belah 5 - 7 cm M3 Rp. 175,000.00
5 Batu Pecah 2 - 3 cm M3 Rp. 320,000.00
6 Bak Fiber Bh Rp. 500,000.00
7 Besi Beton Polos Kg Rp. 13,000.00
8 Besi Beton Ulir Kg Rp. 16,000.00
9 Bubungan Genteng (Rabung ) M1 Rp. 35,000.00
10 Cat Dasar Tembok / Sealer Setara Vinilex Kg Rp. 25,000.00
11 Cat Kayu Dasar Kg Rp. 45,000.00
12 Cat Kayu Mengkilat Kg Rp. 55,000.00
13 Cat Menie Besi Kg Rp. 30,000.00
14 Cat Tembok Setara Minilex Kg Rp. 40,000.00
15 Dempul Kayu Kg Rp. 17,000.00
16 Dolken Kayu diameter Ø 8 - 10/400 cm Batang Rp. 65,000.00
17 Door Holder Batang Rp. 120,000.00
18 Engsel Jendela Batang Rp. 24,000.00
19 Engsel Pintu Batang Rp. 24,000.00
20 Floor Drain Buah Rp. 20,000.00
21 Gypsum Board Tebal 9 mm Lembar Rp. 110,000.00
22 Jaring Kawat baja Kg Rp. 25,000.00
23 Hak Angin Pasang Rp. 15,000.00
24 Kaca Bening UK. 3 mm M2 Rp. 75,000.00
25 Kaca Bening UK. 5 mm M2 Rp. 100,000.00
26 Kaso-kaso ( 5 x 7 ) cm M3 Rp. 3,200,000.00
27 Kawat Beton Kg Rp. 18,000.00
28 Kayu Klas I ( Seumantok / Ulim / dll ) M3 Rp. 5,000,000.00
29 Kayu Klas II ( Kamper / Kruing / dll ) M3 Rp. 4,500,000.00
30 Kayu Klas III ( Borneo / dll ) M3 Rp. 3,850,000.00
31 Kayu Klas IV ( Sengon / dll ) M3 Rp. 3,250,000.00
32 Kayu Dolken dia. 8 - 10 cm Batang Rp. 50,000.00
33 Keramik UK. 25 x 25 cm (UnPholished) Bh Rp. 5,200.00
34 Keramik UK. 25 x 40 cm (Pholished) Bh Rp. 2,760.00
35 Keramik UK. 40 x 40 cm (UnPholished) Bh Rp. 13,640.00
36 Keramik UK. 40 x 40 cm (Pholished) Bh Rp. 13,300.00
37 Kertas Amplas Lembar Rp. 2,500.00
38 Klost Jongkok Keramik Setara Toto Bh Rp. 400,000.00
39 Krawang /Roster Bh Rp. 35,000.00

Page 1 of 89
40 Kran Air 3/4 " Bh Rp. 14,000.00
41 Kuas Cat Bh Rp. 15,000.00
42 Kunci Pintu ( Standar ) Bh Rp. 125,000.00
43 Kunci Pintu Biasa Bh Rp. 85,000.00
44 Lampu Hemat Energi 11 Watt Setara Hannochs Bh Rp. 30,000.00
45 Lampu Hemat Energi 18 Watt Setara Hannochs Bh Rp. 35,000.00
46 Lampu Hemat Energi 23 Watt Setara Hannochs Bh Rp. 75,000.00
47 Lem Kayu Kg Rp. 18,000.00
48 List Eternit Kayu M1 Rp. 7,000.00
49 Minyak Cat Liter Rp. 24,000.00
50 Minyak Bekisting Liter Rp. 7,500.00
51 Multipleks 3 mm Lembar Rp. 75,000.00
52 Multipleks 4 mm Lembar Rp. 85,000.00
53 Multipleks 6 mm Lembar Rp. 120,000.00
54 Multipleks 9 mm Lembar Rp. 140,000.00
55 Pacok Jendela Dan Ventilasi Pasang Rp. 7,500.00
56 Paku Asbes Kg Rp. 18,000.00
57 Paku Beton 8 Inci Kotak Rp. 19,000.00
58 Paku Kait Buah Rp. 1,000.00
59 Paku Kayu Kg Rp. 17,500.00
60 Paku Tripleks Kg Rp. 17,000.00
61 Paku Seng Kg Rp. 19,500.00
62 Papan Kayu Kelas II M3 Rp. 5,100,000.00
63 Paku Sumbat Buah Rp. 1,200.00
64 Paku Sekrup Kg Rp. 24,000.00
65 Pasir Btu (Sirtu ) - Matrial Jalan M3 Rp. 300,000.00
66 Pasir Beton / Kerikil M3 Rp. 132.14
67 Pasir Pasang Kg Rp. 125.00
68 Kerikil Kg Rp. 101.51
69 Pasir Urug M3 Rp. 85.71
70 Pelumaas / Oil Liter Rp. 35,000.00
71 Plamur Tembok Kg Rp. 30,000.00
72 Plamir Kayu Kg Rp. 24,500.00
73 Plin Keramik Buah Rp. 4,500.00
74 Plywood Tebal 9 mm Lembar Rp. 140,000.00
75 Residu Kg Rp. 10,000.00
76 Reservoid Air 500 Ltr Buah Rp. 1,200,000.00
77 Reservoid Air 1000 Ltr Buah Rp. 1,850,000.00
78 Reservoid Air 500 Ltr Stainless Steel Buah Rp. 2,000,000.00
79 Schakelar Buah Rp. 12,000.00
80 Semen @ 40 kg Zak Rp. 55,000.00
81 Semen Portlanf (PC) @ 40 kg Kg Rp. 1,375.00
82 Semen Putih @ 50 Kg Kg Rp. 220,000.00
83 Semen Warna Kg Rp. 4,400.00
84 Seng Genteng Metal M2 Rp. 65,000.00
85 Seng BJLS 0,20 Cat Pabrik M2 Rp. 47,500.00
86 Seng Gelombang BJLS 30 M2 Rp. 55,000.00
87 Seng Gelombang BJLS 30 Cat Pabrik M2 Rp. 60,000.00
88 Seng Plat BJLS 20 M2 Rp. 40,000.00
89 Seng Plat BJLS 30 M2 Rp. 55,000.00
90 Sekrup Fixer BUah Rp. 500.00
91 Sealant Kg Rp. 15,000.00
92 Sumur + Pompa Tangan terpasang Unit Rp. 1,750,000.00
93 Tanah Tibun M3 Rp. 65,000.00
94 Teralis Besi M2 Rp. 375,000.00
95 Titik Lampui + Instalasi Titik Rp. 150,000.00
96 Zakering Buah Rp. 300,000.00
97 Pemasangan Atap Baja Ringan M2 Rp. 275,000.00
98 Pipa PVC 3/4" Batang Rp. 47,900.00
99 Pipa PVC 3" Batang Rp. 245,900.00
100 Pipa PVC 4" Batang Rp. 282,800.00

C. BALAT

1 Stamper Jam Rp. 25,000.00


2 Dump Truck Jam Rp. 75,000.00
3 Molen Jam Rp. 50,000.00

Page 2 of 89
Page 3 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembersihan Lapangan


Satuan / Unit : M2
Analisa : AHSP PU.A.2.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 85,000.00 8,500.00
2 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 13,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 13,500.00
E Overhead & Profit 10% X D 1,350.00
F Harga Satuan Pekerjaan ( D + E ) 14,850.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengukuran dan Pemasangan Bouwplank


Satuan / Unit : M'
Analisa : AHSP PU.A.2.2.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 85,000.00 8,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 21,200.00
B. BAHAN
1 Kayu Kelas III M3 0.0120 3,850,000.00 46,200.00
2 Paku Kayu Kg 0.0200 17,500.00 350.00
3 Papan Kayu Kelas II M3 0.0070 5,100,000.00 35,700.00
Jumlah Bahan 82,250.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 103,450.00
E Overhead & Profit 10% X D 10,345.00
F Harga Satuan Pekerjaan ( D + E ) 113,795.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 1 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7500 85,000.00 63,750.00
2 Mandor OH 0.0250 100,000.00 2,500.00
Jumlah Tenaga Kerja 66,250.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 66,250.00
E Overhead & Profit 10% X D 6,625.00
F Harga Satuan Pekerjaan ( D + E ) 72,875.00

Page 4 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 2 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 85,000.00 76,500.00
2 Mandor OH 0.0450 100,000.00 4,500.00
Jumlah Tenaga Kerja 81,000.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 81,000.00
E Overhead & Profit 10% X D 8,100.00
F Harga Satuan Pekerjaan ( D + E ) 89,100.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Galian Tanah Biasa Sedalam 3 Meter


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.3

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0500 85,000.00 89,250.00
2 Mandor OH 0.0670 100,000.00 6,700.00
Jumlah Tenaga Kerja 95,950.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 95,950.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 95,950.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Mengurug Kembali Galian


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 85,000.00 21,250.00
2 Mandor OH 0.0833 100,000.00 8,330.00
Jumlah Tenaga Kerja 29,580.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 29,580.00
E Overhead & Profit 10% X D 2,958.00
F Harga Satuan Pekerjaan ( D + E ) 32,538.00

Page 5 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memadatkan tanah (per 20 cm)


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5000 85,000.00 42,500.00
2 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 47,500.00
B. BAHAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 47,500.00
E Overhead & Profit 10% X D 4,750.00
F Harga Satuan Pekerjaan ( D + E ) 52,250.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Urugan Pasir


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 26,500.00
B. BAHAN
1 Pasir Urug M3 1.200 85.71 102.86
Jumlah Bahan 102.86
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 26,602.86
E Overhead & Profit 10% X D 2,660.29
F Harga Satuan Pekerjaan ( D + E ) 29,263.14

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Timbunan Tanah


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.11.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 26,500.00
B. BAHAN
1 Tanah Timbun M3 1.200 65,000.00 78,000.00
Jumlah Bahan 78,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 104,500.00
E Overhead & Profit 10% X D 10,450.00
F Harga Satuan Pekerjaan ( D + E ) 114,950.00

Page 6 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengurugan 1 M3 Sirtu


Satuan / Unit : M3
Analisa : AHSP PU A.2.3.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 85,000.00 21,250.00
2 Mandor OH 0.0250 100,000.00 2,500.00
Jumlah Tenaga Kerja 23,750.00
B. BAHAN
1 Sirtu M3 1.200 300,000.00 360,000.00
Jumlah Bahan 360,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 383,750.00
E Overhead & Profit 10% X D 38,375.00
F Harga Satuan Pekerjaan ( D + E ) 422,125.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pondasi Batu Belah / Kali Campuran 1 : 4


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.5000 85,000.00 127,500.00
2 Tukang OH 0.7500 110,000.00 82,500.00
3 Kepala Tukang OH 0.0750 120,000.00 9,000.00
4 Mandor OH 0.0750 100,000.00 7,500.00
Jumlah Tenaga Kerja 226,500.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.200 185,000.00 222,000.00
2 Semen Portland (PC) Kg 163.000 1,375.00 224,125.00
3 Pasir Pasang M3 0.520 125.00 65.00
Jumlah Bahan 446,190.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 672,690.00
E Overhead & Profit 10% X D 67,269.00
F Harga Satuan Pekerjaan ( D + E ) 739,959.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Batu Kosong ( Anstamping )


Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7800 85,000.00 66,300.00
2 Tukang OH 0.3900 110,000.00 42,900.00
3 Kepala Tukang OH 0.0390 120,000.00 4,680.00
4 Mandor OH 0.0390 100,000.00 3,900.00
Jumlah Tenaga Kerja 117,780.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 1.2000 185,000.00 222,000.00
2 Pasir Urug M3 0.4320 85.71 37.03
Jumlah Bahan 222,037.03
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 339,817.03
E Overhead & Profit 10% X D 33,981.70
F Harga Satuan Pekerjaan ( D + E ) 373,798.73

Page 7 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan 1 M3 Pondasi Cyclopen 60% Camp 1Pc:2PB:3Kr 40% Batu Belah
Satuan / Unit : M3
Analisa : AHSP PU A.3.2.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 3.4000 85,000.00 289,000.00
2 Tukang Batu OH 0.8500 110,000.00 93,500.00
3 Kepala Tukang OH 0.0850 120,000.00 10,200.00
4 Mandor OH 0.1700 100,000.00 17,000.00
Jumlah Tenaga Kerja 409,700.00
B. BAHAN
1 Batu Gunung/ Batu Kali M3 0.4800 185,000.00 88,800.00
Semen Portland (PC) Kg 194.0000 1,375.00 266,750.00
Pasir Beton (M3) M3 0.3120 132.14 41.23
Kerikil (M3) M3 0.4680 101.51 47.51
Besi Beton Kg - -
2 Kawat Beton Kg - -
Jumlah Bahan 355,638.73
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 765,338.73
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 765,338.73

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 9,8 Mpa (K 125), Slump (12 ± 2) cm, W/c = 0,78
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 276.00 1,375.00 379,500.00
2 Pasir Beton (PB) Kg 828.00 132.14 109,414.29
3 Kerikil (KR) Kg 1,012.00 101.51 102,727.00
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 617,441.28
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 799,601.28
E Overhead & Profit 10% X D 79,960.13
F Harga Satuan Pekerjaan ( D + E ) 879,561.41

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Page 8 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 14,5 Mpa (K 175), Slump (12 ± 2) cm, W/c = 0,66
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 326.00 1,375.00 448,250.00
2 Pasir Beton (PB) Kg 760.00 132.14 100,428.57
3 Kerikil (KR) Kg 1,029.00 101.51 104,452.65
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 678,931.22
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 861,091.22
E Overhead & Profit 10% X D 86,109.12
F Harga Satuan Pekerjaan ( D + E ) 947,200.34

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 16,9 Mpa (K 200), Slump (12 ± 2) cm, W/c = 0,61
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 352.00 1,375.00 484,000.00
2 Pasir Beton (PB) Kg 731.00 132.14 96,596.43
3 Kerikil (KR) Kg 1,031.00 101.51 104,655.66
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 711,052.09
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 893,212.09
E Overhead & Profit 10% X D 89,321.21
F Harga Satuan Pekerjaan ( D + E ) 982,533.30

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Page 9 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 371.00 1,375.00 510,125.00
2 Pasir Beton (PB) Kg 698.00 132.14 92,235.71
3 Kerikil (KR) Kg 1,047.00 101.51 106,279.81
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 734,440.52
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 916,600.52
E Overhead & Profit 10% X D 91,660.05
F Harga Satuan Pekerjaan ( D + E ) 1,008,260.57

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 21,7 Mpa (K 250), Slump (12 ± 2) cm, W/c = 0,56
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 384.00 1,375.00 528,000.00
2 Pasir Beton (PB) Kg 692.00 132.14 91,442.86
3 Kerikil (KR) Kg 1,039.00 101.51 105,467.74
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 750,710.59
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 932,870.59
E Overhead & Profit 10% X D 93,287.06
F Harga Satuan Pekerjaan ( D + E ) 1,026,157.65

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

Page 10 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Beton Mutu F'c = 24,0 Mpa (K 275), Slump (12 ± 2) cm, W/c = 0,53
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.8

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.6500 85,000.00 140,250.00
2 Tukang OH 0.2750 110,000.00 30,250.00
3 Kepala Tukang OH 0.0280 120,000.00 3,360.00
4 Mandor OH 0.0830 100,000.00 8,300.00
Jumlah Tenaga Kerja 182,160.00
B. BAHAN
1 Semen Portland (PC) Kg 406.00 1,375.00 558,250.00
2 Pasir Beton (PB) Kg 684.00 132.14 90,385.71
3 Kerikil (KR) Kg 1,026.00 101.51 104,148.12
4 Air Liter 215.00 120.00 25,800.00
Jumlah Bahan 778,583.83
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 960,743.83
E Overhead & Profit 10% X D 96,074.38
F Harga Satuan Pekerjaan ( D + E ) 1,056,818.22

Wc Faktor; Pasir; 1.400 Kg, dan Kerikil = 1.350 Kg

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Polos


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 85,000.00 5,950.00
2 Tukang OH 0.0700 110,000.00 7,700.00
3 Kepala Tukang OH 0.0070 120,000.00 840.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 18,490.00
B. BAHAN
1 Besi Beton Polos Kg 10.500 13,000.00 136,500.00
2 Kawat Beton Kg 0.150 18,000.00 2,700.00
Jumlah Bahan 139,200.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 157,690.00
E Per Kg Pembesian = D / 10 15,769.00
F Overhead & Profit 10% X E 1,576.90
G Harga Satuan Pekerjaan ( E + F ) 17,345.90

Page 11 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pembesian 1 Kg Dengan Besi Ulir


Satuan / Unit : Kg
Analisa : AHSP PU A.4.1.1.17.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 85,000.00 5,950.00
2 Tukang OH 0.0700 110,000.00 7,700.00
3 Kepala Tukang OH 0.0070 120,000.00 840.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 18,490.00
B. BAHAN
1 Besi Beton Ulir Kg 10.500 16,000.00 168,000.00
2 Kawat Beton Kg 0.150 18,000.00 2,700.00
Jumlah Bahan 170,700.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 189,190.00
E Per Kg Pembesian = D / 10 18,919.00
F Overhead & Profit 10% X E 1,891.90
G Harga Satuan Pekerjaan ( E + F ) 20,810.90

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Pondasi


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.20

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 85,000.00 44,200.00
2 Tukang OH 0.2600 110,000.00 28,600.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 78,520.00
B. BAHAN
1 Kayu Kelas III M3 0.040 3,850,000.00 154,000.00
2 Paku 5 cm - 10 cm Kg 0.300 17,500.00 5,250.00
3 Minyak Bekisting Liter 0.100 7,500.00 750.00
Jumlah Bahan 160,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 238,520.00
E Overhead & Profit 10% X D 23,852.00
F Harga Satuan Pekerjaan ( D + E ) 262,372.00
G Harga Satuan Pekerjaan ( F )Pemakaian 1 x 262,372.00

Page 12 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Sloof


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.5200 85,000.00 44,200.00
2 Tukang OH 0.2600 110,000.00 28,600.00
3 Kepala Tukang OH 0.0260 120,000.00 3,120.00
4 Mandor OH 0.0260 100,000.00 2,600.00
Jumlah Tenaga Kerja 78,520.00
B. BAHAN
1 Kayu Kelas III M3 0.045 3,850,000.00 173,250.00
2 Paku 5 cm - 10 cm Kg 0.300 17,500.00 5,250.00
3 Minyak Bekisting Liter 0.100 7,500.00 750.00
Jumlah Bahan 179,250.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 257,770.00
E Overhead & Profit 10% X D 25,777.00
F Harga Satuan Pekerjaan ( D + E ) 283,547.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 94,515.67

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,850,000.00 154,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.2000 7,500.00 1,500.00
4 Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
5 Mutipleks tebal 9 mm Lbr 0.3500 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 65,000.00 130,000.00
Jumlah Bahan 409,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 416,000.00
E Overhead & Profit 15% X D 62,400.00
F Harga Satuan Pekerjaan ( D + E ) 478,400.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 159,466.67

Page 13 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Kolom PEDESTAL


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.22.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,850,000.00 154,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.2000 7,500.00 1,500.00
4 Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
5 Mutipleks tebal 9 mm Lbr 0.3500 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang
Jumlah Bahan 279,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 286,000.00
E Overhead & Profit 15% X D 42,900.00
F Harga Satuan Pekerjaan ( D + E ) 328,900.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 109,633.33

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Balok


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,850,000.00 154,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.2000 7,500.00 1,500.00
4 Balok Kayu Kelas II M3 0.0180 4,500,000.00 81,000.00
5 Mutipleks tebal 9 mm Lbr 0.3500 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.0000 65,000.00 130,000.00
Jumlah Bahan 422,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 429,500.00
E Overhead & Profit 15% X D 64,425.00
F Harga Satuan Pekerjaan ( D + E ) 493,925.00
G Harga Satuan Pekerjaan ( F )Pemakaian 3 x 164,641.67

Page 14 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Plat Lantai


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.24

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.0400 3,850,000.00 154,000.00
2 Paku 5 cm - 10 cm Kg 0.4000 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.2000 7,500.00 1,500.00
4 Balok Kayu Kelas II M3 0.0150 4,500,000.00 67,500.00
5 Mutipleks tebal 9 mm Lbr 0.3500 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 6.0000 65,000.00 390,000.00
Jumlah Bahan 669,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 676,000.00
E Overhead & Profit 10% X D 67,600.00
F Harga Satuan Pekerjaan ( D + E ) 743,600.00
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 371,800.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Dinding


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.25

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.030 3,850,000.00 115,500.00
2 Paku 5 cm - 10 cm Kg 0.400 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.200 7,500.00 1,500.00
4 Balok Kayu Kelas II M3 0.020 4,500,000.00 90,000.00
5 Mutipleks tebal 9 mm Lbr 0.350 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 3.000 65,000.00 195,000.00
7 Penjaga jarak bekisting/ Spacer Bh 4.000 -
Jumlah Bahan 458,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 459,500.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 459,500.00
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 229,750.00

Page 15 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Bekisting Untuk Tangga


Satuan / Unit : M2
Analisa : AHSP PU A.4.1.1.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6600 85,000.00 56,100.00
2 Tukang OH 0.3300 110,000.00 36,300.00
3 Kepala Tukang OH 0.0330 120,000.00 3,960.00
4 Mandor OH 0.0330 100,000.00 3,300.00
Jumlah Tenaga Kerja 99,660.00
B. BAHAN
1 Kayu Kelas III M3 0.030 3,850,000.00 115,500.00
2 Paku 5 cm - 10 cm Kg 0.400 17,500.00 7,000.00
3 Minyak Bekisting Liter 0.150 7,500.00 1,125.00
4 Balok Kayu Kelas II M3 0.015 4,500,000.00 67,500.00
5 Mutipleks tebal 9 mm Lbr 0.350 140,000.00 49,000.00
6 Kayu dolken dia. 8-10 cm, L = 4 M Batang 2.000 65,000.00 130,000.00
Jumlah Bahan 370,125.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 377,125.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 377,125.00
G Harga Satuan Pekerjaan ( F )Pemakaian 2 x 188,562.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata ( 5x11x22) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Batu Bata Bh 70.000 800.00 56,000.00
2 Semen Portland (PC) Kg 18.950 1,375.00 26,056.25
3 Pasir Pasang M3 0.038 125.00 4.75
Jumlah Bahan 82,061.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 121,261.00
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 121,261.00

Page 16 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata ( 4x10x20) cm Tebal 1/2 Bata Camp. 1Pc : 2 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.7.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Batu Bata Bh 85.000 800.00 68,000.00
2 Semen Portland (PC) Kg 18.950 1,375.00 26,056.25
3 Pasir Pasang M3 0.038 125.00 4.75
Jumlah Bahan 94,061.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 133,261.00
E Overhead & Profit 10% X E 13,326.10
F Harga Satuan Pekerjaan ( E + F ) 146,587.10

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 11 x 22 ) cmTebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Batu Bata Bh 70.000 800.00 56,000.00
2 Semen Portland (PC) Kg 11.500 1,375.00 15,812.50
3 Pasir Pasang M3 0.043 125.00 5.38
Jumlah Bahan 71,817.88
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 111,017.88
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 111,017.88

Page 17 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Bata ( 5 x 10 x 20 ) cm Tebal 1/2 Bata Camp. 1Pc : 4 PP
Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.9.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Batu Bata Bh 85.000 800.00 68,000.00
2 Semen Portland (PC) Kg 11.500 1,375.00 15,812.50
3 Pasir Pasang M3 0.043 125.00 5.38
Jumlah Bahan 83,817.88
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 123,017.88
E Overhead & Profit 10% X E 12,301.79
F Harga Satuan Pekerjaan ( E + F ) 135,319.66

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 3 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 35,000.00 1,050,000.00
2 Semen Portland (PC) Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 125.00 4.38
Jumlah Bahan 1,065,129.38
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,104,329.38
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 1,104,329.38

Page 18 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Kerawang (Roster) Camp. 1 PC : 4 PP


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.1.23

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 39,200.00
B. BAHAN
1 Kerawang/ Roster Bh 30.000 35,000.00 1,050,000.00
2 Semen Portland (PC) Kg 11.000 1,375.00 15,125.00
3 Pasir Pasang M3 0.035 125.00 4.38
Jumlah Bahan 1,065,129.38
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 1,104,329.38
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 1,104,329.38

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 2 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 45,300.00
B. BAHAN
1 Semen Portland (PC) Kg 10.224 1,375.00 14,058.00
2 Pasir Pasang M3 0.020 125.00 2.50
Jumlah Bahan 14,060.50
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 59,360.50
E Overhead & Profit 10% X E 5,936.05
F Harga Satuan Pekerjaan ( E + F ) 65,296.55

Page 19 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Plesteran 1 PC : 4 PP Tebal 15 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 45,300.00
B. BAHAN
1 Semen Portland (PC) Kg 6.240 1,375.00 8,580.00
2 Pasir Pasang M3 0.024 125.00 3.00
Jumlah Bahan 8,583.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 53,883.00
E Overhead & Profit 10% X E 5,388.30
F Harga Satuan Pekerjaan ( E + F ) 59,271.30

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Acian


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.2.27

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 85,000.00 17,000.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0100 100,000.00 1,000.00
Jumlah Tenaga Kerja 30,200.00
B. BAHAN
1 Semen Portland (PC) Kg 3.250 1,375.00 4,468.75
Jumlah Bahan 4,468.75
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 34,668.75
E Overhead & Profit 10% X E 3,466.88
F Harga Satuan Pekerjaan ( E + F ) 38,135.63

Page 20 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 40 x 40 cm Pholished


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35.b

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 85,000.00 59,500.00
2 Tukang OH 0.3500 110,000.00 38,500.00
3 Kepala Tukang OH 0.0350 120,000.00 4,200.00
4 Mandor OH 0.0350 100,000.00 3,500.00
Jumlah Tenaga Kerja 105,700.00
B. BAHAN
1 Keramik Lantai 40 x 40 cm Pholished Bh 6.675 13,300.00 88,777.50
2 Semen Portland (PC) Kg 10.000 1,375.00 13,750.00
3 Pasir Pasang M3 0.045 125.00 5.63
4 Semen Warna Kg 1.500 4,400.00 6,600.00
Jumlah Bahan 109,133.13
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 214,833.13
E Overhead & Profit 10% X E 21,483.31
F Harga Satuan Pekerjaan ( E + F ) 236,316.44

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 40 x 40 cm UnPholished


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.35.c

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 85,000.00 59,500.00
2 Tukang OH 0.3500 110,000.00 38,500.00
3 Kepala Tukang OH 0.0350 120,000.00 4,200.00
4 Mandor OH 0.0350 100,000.00 3,500.00
Jumlah Tenaga Kerja 105,700.00
B. BAHAN
1 Keramik Lantai 40 x 40 cm UnPholished Bh 6.675 13,640.00 91,047.00
2 Semen Portland (PC) Kg 10.000 1,375.00 13,750.00
3 Pasir Pasang M3 0.045 125.00 5.63
4 Semen Warna Kg 1.500 4,400.00 6,600.00
Jumlah Bahan 111,402.63
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 217,102.63
E Overhead & Profit 10% X E 21,710.26
F Harga Satuan Pekerjaan ( E + F ) 238,812.89

Page 21 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Keramik Lantai Uk. 25 x 25 cm UnPholished


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.36.a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.7000 85,000.00 59,500.00
2 Tukang OH 0.3500 110,000.00 38,500.00
3 Kepala Tukang OH 0.0350 120,000.00 4,200.00
4 Mandor OH 0.0350 100,000.00 3,500.00
Jumlah Tenaga Kerja 105,700.00
B. BAHAN
1 Keramik Lantai 25 x 25 cm UnPholished Bh 17.000 5,200.00 88,400.00
2 Semen Portland (PC) Kg 10.400 1,375.00 14,300.00
3 Pasir Pasang M3 0.045 125.00 5.63
4 Semen Warna Kg 1.620 4,400.00 7,128.00
Jumlah Bahan 109,833.63
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 215,533.63
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 215,533.63

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pasangan Dinding Keramik Uk. 25 x 40 cm


Satuan / Unit : M2
Analisa : AHSP PU A.4.4.3.54.b

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.9000 85,000.00 76,500.00
2 Tukang OH 0.4500 110,000.00 49,500.00
3 Kepala Tukang OH 0.0450 120,000.00 5,400.00
4 Mandor OH 0.0450 100,000.00 4,500.00
Jumlah Tenaga Kerja 135,900.00
B. BAHAN
1 Keramik Dinding 25 x 40 cm Bh 10.600 2,760.00 29,256.00
2 Semen Portland (PC) Kg 9.300 1,375.00 12,787.50
3 Pasir Pasang M3 0.018 125.00 2.25
4 Semen Warna Kg 1.940 4,400.00 8,536.00
Jumlah Bahan 50,581.75
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 186,481.75
E Overhead & Profit 10% X E
F Harga Satuan Pekerjaan ( E + F ) 186,481.75

Page 22 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m2 Langit-Langit Gypsum Board Ukuran (120x240x9)mm, Tebal 9 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.1.7

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 85,000.00 8,500.00
2 Tukang OH 0.0500 110,000.00 5,500.00
3 Kepala Tukang OH 0.0050 120,000.00 600.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 15,100.00
B. BAHAN
1 Gypsum Lembar 0.364 110,000.00 40,040.00
2 Paku Skrup Kg 0.110 24,000.00 2,640.00
Jumlah Bahan 42,680.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 57,780.00
E Overhead & Profit 10% X E 5,778.00
F Harga Satuan Pekerjaan ( E + F ) 63,558.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Atap Seng Genteng Metal


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.32

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2000 85,000.00 17,000.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0010 100,000.00 100.00
Jumlah Tenaga Kerja 29,300.00
B. BAHAN
1 Atap Genteng Metal Lbr 1.0200 65,000.00 66,300.00
2 Paku Seng Kg 0.2000 19,500.00 3,900.00
Jumlah Bahan 70,200.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 99,500.00
E Overhead & Profit 10% X D 9,950.00
F Harga Satuan Pekerjaan ( D + E ) 109,450.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Rabung Seng Genteng Metal


Satuan / Unit : M2
Analisa : AHSP PU A.4.5.2.36

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.2500 85,000.00 21,250.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0130 100,000.00 1,300.00
Jumlah Tenaga Kerja 40,850.00
B. BAHAN
1 Rabung Genteng Metal Lbr 1.1000 60,000.00 66,000.00
2 Paku Seng Kg 0.0500 19,500.00 975.00
Jumlah Bahan 66,975.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 107,825.00
E Overhead & Profit 10% X D 10,782.50

Page 23 of 89
F Harga Satuan Pekerjaan ( D + E ) 118,607.50

Page 24 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Kusen Pintu Dan Jendela, Kayu Kelas I
Satuan / Unit : M3
Analisa : AHSP PU A.4.6.1.1

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 7.0000 85,000.00 595,000.00
2 Tukang OH 21.0000 110,000.00 2,310,000.00
3 Kepala Tukang OH 2.1000 120,000.00 252,000.00
4 Mandor OH 0.3500 100,000.00 35,000.00
Jumlah Tenaga Kerja 3,192,000.00
B. BAHAN
1 Balok Kayu Kelas I M3 1.1000 5,000,000.00 5,500,000.00
2 Paku Kayu Kg 1.2500 17,500.00 21,875.00
3 Lem Kayu Kg 1.0000 18,000.00 18,000.00
Jumlah Bahan 5,539,875.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 8,731,875.00
E Overhead & Profit 10% X D 873,187.50
F Harga Satuan Pekerjaan ( D + E ) 9,605,062.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Pintu Panel Kayu Kelas II
Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 85,000.00 85,000.00
2 Tukang OH 3.0000 110,000.00 330,000.00
3 Kepala Tukang OH 0.3000 120,000.00 36,000.00
4 Mandor OH 0.0500 100,000.00 5,000.00
Jumlah Tenaga Kerja 456,000.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0400 5,100,000.00 204,000.00
2 Lem Kayu Kg 0.5000 18,000.00 9,000.00
Jumlah Bahan 213,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 669,000.00
E Overhead & Profit 10% X D 66,900.00
F Harga Satuan Pekerjaan ( D + E ) 735,900.00

Page 25 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Membuat dan Memasang Daun Jendela Kayu Kelas II


Satuan / Unit : M2 3.480
Analisa : AHSP PU A.4.6.1.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.8000 85,000.00 68,000.00
2 Tukang OH 2.4000 110,000.00 264,000.00
3 Kepala Tukang OH 0.2400 120,000.00 28,800.00
4 Mandor OH 0.0400 100,000.00 4,000.00
Jumlah Tenaga Kerja 364,800.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0240 5,100,000.00 122,400.00
2 Lem Kayu Kg 0.3000 18,000.00 5,400.00
Jumlah Bahan 127,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 492,600.00
E Overhead & Profit 10% X D 49,260.00
F Harga Satuan Pekerjaan ( D + E ) 541,860.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Jalusi Kusen, Kayu Kelas I


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.6700 85,000.00 56,950.00
2 Tukang OH 2.0000 110,000.00 220,000.00
3 Kepala Tukang OH 0.2000 120,000.00 24,000.00
4 Mandor OH 0.3350 100,000.00 33,500.00
Jumlah Tenaga Kerja 334,450.00
B. BAHAN
1 Papan Kayu Kelas I M3 0.0600 5,000,000.00 300,000.00
2 Paku Kayu Kg 0.1500 18,000.00 2,700.00
Jumlah Bahan 302,700.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 637,150.00
E Overhead & Profit 10% X D 63,715.00
F Harga Satuan Pekerjaan ( D + E ) 700,865.00

Page 26 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m2 Kaca Rebal 5 mm


Satuan / Unit : M2
Analisa : AHSP PU A.4.6.2.17

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 85,000.00 1,275.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 19,655.00
B. BAHAN
1 Kaca Tebal 5 mm M3 1.1000 100,000.00 110,000.00
2 Sealant Kg 0.0500 15,000.00 750.00
Jumlah Bahan 110,750.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 130,405.00
E Overhead & Profit 10% X D 13,040.50
F Harga Satuan Pekerjaan ( D + E ) 143,445.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Listplank Uk. 3 x 20 Cm Kayu Kelas I atau Klas II


Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.21

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 85,000.00 8,500.00
2 Tukang Kayu OH 0.2000 110,000.00 22,000.00
3 Kepala Tukang OH 0.0200 120,000.00 2,400.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 33,400.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0108 5,000,000.00 54,000.00
2 Paku Kg 0.1000 18,000.00 1,800.00
Jumlah Bahan 55,800.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 89,200.00
E Overhead & Profit 10% X D 8,920.00
F Harga Satuan Pekerjaan ( D + E ) 98,120.00

Page 27 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Listplank Uk. 2.5 x 30 Cm Kayu Kelas I atau Klas II
Satuan / Unit : M'
Analisa : AHSP PU A.4.6.1.22

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.1000 85,000.00 8,500.00
2 Tukang Kayu OH 0.2000 110,000.00 22,000.00
3 Kepala Tukang OH 0.0200 120,000.00 2,400.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 33,400.00
B. BAHAN
1 Papan Kayu Kelas II M3 0.0110 5,000,000.00 55,000.00
2 Paku 5 cm - 7 cm Kg 0.0500 18,000.00 900.00
Jumlah Bahan 55,900.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 89,300.00
E Overhead & Profit 10% X D 8,930.00
F Harga Satuan Pekerjaan ( D + E ) 98,230.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0050 85,000.00 425.00
2 Tukang OH 0.5000 110,000.00 55,000.00
3 Kepala Tukang OH 0.0500 120,000.00 6,000.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 61,725.00
B. BAHAN
1 Kunci Pintu Silinder Bh 1.0000 125,000.00 125,000.00
Jumlah Bahan 125,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 186,725.00
E Overhead & Profit 10% X D 18,672.50
F Harga Satuan Pekerjaan ( D + E ) 205,397.50

Page 28 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kunci Silinder


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.4a

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0050 85,000.00 425.00
2 Tukang OH 0.5000 110,000.00 55,000.00
3 Kepala Tukang OH 0.0500 120,000.00 6,000.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 61,725.00
B. BAHAN
1 Kunci Pintu Silinder Bh 1.0000 85,000.00 85,000.00
Jumlah Bahan 85,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 146,725.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 146,725.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Pintu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.5

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 85,000.00 1,275.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 19,655.00
B. BAHAN
1 Engsel Pintu Bh 1.0000 24,000.00 24,000.00
Jumlah Bahan 24,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,655.00
E Overhead & Profit 10% X D 4,365.50
F Harga Satuan Pekerjaan ( D + E ) 48,020.50

Page 29 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Engsel Jendela Kupu-Kupu


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.6

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 85,000.00 1,275.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 19,655.00
B. BAHAN
1 Engsel Jendela Bh 1.0000 24,000.00 24,000.00
Jumlah Bahan 24,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 43,655.00
E Overhead & Profit 10% X D 4,365.50
F Harga Satuan Pekerjaan ( D + E ) 48,020.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Hak/ Kait Angin Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.9

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 85,000.00 1,275.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 19,655.00
B. BAHAN
1 Hak Angin Jendela Bh 1.0000 15,000.00 15,000.00
Jumlah Bahan 15,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 34,655.00
E Overhead & Profit 10% X D 3,465.50
F Harga Satuan Pekerjaan ( D + E ) 38,120.50

Page 30 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Pacok Jendela


Satuan / Unit : Buah
Analisa : AHSP PU A.4.6.2.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0150 85,000.00 1,275.00
2 Tukang OH 0.1500 110,000.00 16,500.00
3 Kepala Tukang OH 0.0150 120,000.00 1,800.00
4 Mandor OH 0.0008 100,000.00 80.00
Jumlah Tenaga Kerja 19,655.00
B. BAHAN
1 Pacok Jendela Bh 1.0000 7,500.00 7,500.00
Jumlah Bahan 7,500.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 27,155.00
E Overhead & Profit 10% X D 2,715.50
F Harga Satuan Pekerjaan ( D + E ) 29,870.50

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kloset Jongkok Keramik Setara Toto


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.2

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 1.0000 85,000.00 85,000.00
2 Tukang Batu OH 1.5000 110,000.00 165,000.00
3 Kepala Tukang OH 0.1500 120,000.00 18,000.00
4 Mandor OH 0.1600 100,000.00 16,000.00
Jumlah Tenaga Kerja 284,000.00
B. BAHAN
1 Closet Jongkok Jongkok Keramik Setara Toto Bh 1.0000 400,000.00 400,000.00
2 Semen Portland (PC) Kg 6.0000 1,375.00 8,250.00
3 Pasir Pasang M3 0.0100 125.00 1.25
Jumlah Bahan 408,251.25
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 692,251.25
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 692,251.25

Page 31 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 Buah Bak Fiber


Satuan / Unit : Buah
Analisa : AHSP PU A.5.1.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.3000 85,000.00 25,500.00
2 Tukang OH 0.4500 110,000.00 49,500.00
3 Kepala Tukang OH 0.0450 120,000.00 5,400.00
4 Mandor OH 0.0150 100,000.00 1,500.00
Jumlah Tenaga Kerja 81,900.00
B. BAHAN
1 Bak Fiber Bh 1.0000 500,000.00 500,000.00
4 Perlengkapan % 12.0000 60,000.00 7,200.00
Jumlah Bahan 507,200.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 589,100.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 589,100.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Floor Drain


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.1.14

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 85,000.00 850.00
2 Tukang Batu OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 13,550.00
B. BAHAN
1 Floor Drain Stenlesstell Bh 1.0000 20,000.00 20,000.00
Jumlah Bahan 20,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 33,550.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 33,550.00

Page 32 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Memasang Kran Air dia. 1/2" atau 3/4"


Satuan / Unit : Buah
Analisa : AHSP PU A.4.5.1.19

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0100 85,000.00 850.00
2 Tukang OH 0.1000 110,000.00 11,000.00
3 Kepala Tukang OH 0.0100 120,000.00 1,200.00
4 Mandor OH 0.0050 100,000.00 500.00
Jumlah Tenaga Kerja 13,550.00
B. BAHAN
1 Kran air Dia. 1/2" atau 3/4" Bh 1.0000 14,000.00 14,000.00
Jumlah Bahan 14,000.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 27,550.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 27,550.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Bidang Kayu Baru (1 x plamir, 1 x cat dasar,2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.4

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0700 85,000.00 5,950.00
2 Tukang OH 0.0090 110,000.00 990.00
3 Kepala Tukang OH 0.0060 120,000.00 720.00
4 Mandor OH 0.0030 100,000.00 300.00
Jumlah Tenaga Kerja 7,960.00
B. BAHAN
1 Cat Menie Kg 0.2000 30,000.00 6,000.00
2 Plamir Kayu Kg 0.1500 24,500.00 3,675.00
3 Cat dasar kayu Kg 0.1700 45,000.00 7,650.00
4 Cat kayu penutup /Pengklat Kg 0.2600 55,000.00 14,300.00
5 Kuas Uk 2" - 3" Bh 0.0100 15,000.00 150.00
6 Pengencer/ Minyak cat Liter 0.0300 35,000.00 1,050.00
7 Ampelas Lembar 0.2000 2,500.00 500.00
Jumlah Bahan 33,325.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 41,285.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 41,285.00

Page 33 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pengecatan Tembok Baru (1 x plamir, 1 x cat dasar, 2 x cat penutup)
Satuan / Unit : M2
Analisa : AHSP PU A.4.7.1.10

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.0200 85,000.00 1,700.00
2 Tukang OH 0.0630 110,000.00 6,930.00
3 Kepala Tukang OH 0.0063 120,000.00 756.00
4 Mandor OH 0.0025 100,000.00 250.00
Jumlah Tenaga Kerja 9,636.00
B. BAHAN
1 Plamir Kg 0.1000 30,000.00 3,000.00
2 Cat dasar tembok Kg 0.1000 25,000.00 2,500.00
3 Cat tembok/penutup 2x Kg 0.2600 40,000.00 10,400.00
Jumlah Bahan 15,900.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 25,536.00
E Overhead & Profit 10% X D 2,553.60
F Harga Satuan Pekerjaan ( D + E ) 28,089.60

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m' pipa PVC tipe AW diameter 3/4"


Satuan / Unit : M1
Analisa : AHSP PU A.5.1.1.26

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.036 85,000.00 3,060.00
2 Tukang OH 0.06 110,000.00 6,600.00
3 Kepala Tukang OH 0.006 120,000.00 720.00
4 Mandor OH 0.002 100,000.00 200.00
Jumlah Tenaga Kerja 10,580.00
B. BAHAN
1 Pipa PVC 3/4" (Tipe AW) M 1.2000 47,900.00 57,480.00
2 Perlengkapan LS 35% x Pipa 20,118.00 20,118.00
3
Jumlah Bahan 77,598.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 88,178.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 88,178.00

Page 34 of 89
ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m' pipa PVC tipe AW diameter 3"


Satuan / Unit : M1
Analisa : AHSP PU A.5.1.1.31

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.081 85,000.00 6,885.00
2 Tukang OH 0.135 110,000.00 14,850.00
3 Kepala Tukang OH 0.0135 120,000.00 1,620.00
4 Mandor OH 0.004 100,000.00 400.00
Jumlah Tenaga Kerja 23,755.00
B. BAHAN
1 Pipa PVC 3" (Tipe AW) M 1.2000 245,900.00 295,080.00
2 Perlengkapan LS 35% x Pipa 103,278.00 103,278.00
3
Jumlah Bahan 398,358.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 422,113.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 422,113.00

ANALISA HARGA SATUAN PEKERJAAN

Jenis Pekerjaan : Pemasangan 1 m' pipa PVC tipe AW diameter 4"


Satuan / Unit : M1
Analisa : AHSP PU A.5.1.1.32

No Uraian Satuan Koefisien Harga Satuan Jumlah Harga


A. TENAGA
1 Pekerja OH 0.081 85,000.00 6,885.00
2 Tukang OH 0.135 110,000.00 14,850.00
3 Kepala Tukang OH 0.0135 120,000.00 1,620.00
4 Mandor OH 0.004 100,000.00 400.00
Jumlah Tenaga Kerja 23,755.00
B. BAHAN
1 Pipa PVC 4" (Tipe AW) M 1.2000 85,000.00 102,000.00
2 Perlengkapan LS 35% x Pipa 35,700.00 35,700.00
3
Jumlah Bahan 137,700.00
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 161,455.00
E Overhead & Profit 10% X D
F Harga Satuan Pekerjaan ( D + E ) 161,455.00

Page 35 of 89
BILL OF QUANTITY (BOQ)
Harga Satuan Jumlah Harga
No. Uraian Volume Sat. Analisa
(Rp.) (Rp.)
1 2 3 4 5 6 7=(3x6)
I LANTAI I

A PEKERJAAN TANAH

Pembersihan Lapangan 557.27 M² AHSP PU.A.2.2.1.9 Rp 14,850.00 Rp 8,275,459.50

Pemasangan Bouwplank 91.58 M¹ AHSP PU.A.2.2.1.4 Rp 113,795.00 Rp 10,421,346.10

Jumlah Rp 18,696,805.60

B PEKERJAAN PONDASI

Galian Tanah Pondasi Tapak 193.88 M³ AHSP PU A.2.3.1.3 Rp 95,950.00 Rp 18,602,786.00

Galian Tanah Pondasi Menerus 61.17 M³ AHSP PU A.2.3.1.1 Rp 72,875.00 Rp 4,457,982.38

Timbunan Pasir Bawah Pondasi Tapak 5.55 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 162,322.65

Timbunan Pasir Bawah Pondasi Menerus 3.07 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 89,779.32

Urugan Kembali Bekas Galian 160.70 M³ AHSP PU A.2.3.1.9 Rp 32,538.00 Rp 5,228,791.52

Pasangan Batu Kosong (aanstamping) 19.98 M³ AHSP PU A.3.2.1.9 Rp 373,798.73 Rp 7,467,003.46

Jumlah Rp 36,008,665.33
C PEKERJAAN STRUKTUR PONDASI
Pondasi Tapak tipe 1
Beton K-250 52.49 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 53,860,962.84
Besi Tulangan Pokok Ø 16 4139.92 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 71,810,595.25
Bekisting + Perawatan Beton 131.22 M³ AHSP PU A.4.1.1.20 Rp 262,372.00 Rp 34,428,453.84
jumlah Rp 160,100,011.93
Pondasi Tapak tipe 2
Beton K-250 4.85 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 4,978,916.93
Besi Tulangan Pokok Ø 14 234.40 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 4,065,887.77
Bekisting + Perawatan Beton 9.70 M³ AHSP PU A.4.1.1.20 Rp 262,372.00 Rp 2,546,057.89
jumlah Rp 11,590,862.59
Pondasi Menerus
Pas Batu kosong 8.88 M³ AHSP PU A.3.2.1.9 Rp 373,798.73 Rp 3,319,332.74
Pas batu gunung 22.743 M³ AHSP PU A.3.2.1.2 Rp 739,959.00 Rp 16,828,887.54
Timbunan 15.293 M³ AHSP PU A.2.3.1.11.a Rp 114,950.00 Rp 1,757,930.35
jumlah Rp 21,906,150.62
Total keseluruhan Rp 193,597,025.14
D PEKERJAAN BETON LANTAI 1
Sloof (25/40)
Beton K-250 7.22 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 7,408,858.25
Besi Tulangan Pokok Ø 16 797.64 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 13,835,826.97
Besi Tulangan Sengkang Ø 8 3279.31 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 56,882,543.64
Besi Tulangan Pinggang Ø 14 174.48 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,026,587.15
Bekisting + Perawatan Beton 28.88 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 2,729,612.45
jumlah Rp 83,883,428.46
Sloof (20/30)
Beton K-250 4.068 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 4,174,409.33
Besi Tulangan Pokok Ø 16 535.02 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 9,280,461.70
Besi Tulangan Sengkang Ø 8 227.84 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,952,084.62
Besi Tulangan Pinggang Ø 14 163.85 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,842,141.40
Bekisting + Perawatan Beton 20.34 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 1,922,448.66
jumlah Rp 22,171,545.70
Sloof (25/40)
Beton K-250 13.26 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 13,606,850.47
Besi Tulangan Pokok Ø 16 1464.92 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 25,410,396.90
Besi Tulangan Sengkang Ø 8 6022.66 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 104,468,494.27
Besi Tulangan Pinggang Ø 14 320.45 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 5,558,524.32
Bekisting + Perawatan Beton 53.04 M³ AHSP PU A.4.1.1.21 Rp 94,515.67 Rp 5,013,110.96
jumlah Rp 154,057,376.92
Kolom K1 (35/35)
Beton K-250 16.07 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 16,492,405.78
Besi Tulangan Pokok Ø 14 1268.27 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 21,999,348.15
Besi Tulangan Sengkang Ø 8 435.97 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 7,562,275.93
Besi Tulangan Pinggang Ø 14 634.14 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,999,674.07
Bekisting + Perawatan Beton 91.84 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 14,645,418.67
jumlah Rp 71,699,122.60
Kolom K2 (30/60)
Beton K-250 23.62 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 24,233,739.11
Besi Tulangan Pokok Ø 14 951.21 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 16,499,511.11
Besi Tulangan Sengkang Ø 14 584.23 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,134,067.07
Besi Tulangan Pinggang Ø 14 1268.27 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 21,999,348.15
Bekisting + Perawatan Beton 118.08 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 18,829,824.00
jumlah Rp 91,696,489.44

Kolom K4 (13/13)
Beton K-250 2.77 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 2,842,456.70
Besi Tulangan Pokok Ø 14 582.03 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,095,909.92
Besi Tulangan Sengkang Ø 8 159.73 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,770,693.48
Bekisting + Perawatan Beton 42.62 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 6,795,733.33
jumlah Rp 22,504,793.43
Total Keseluruhan` Rp 684,542,242.27
E PEKERJAAN PASANAGAN DAN PLASTERAN
a. Pasangan Dinding 1/2 Bata 1:2 144.60 M³ AHSP PU A.4.4.1.7 Rp 121,261.00 Rp 17,534,340.60
b. Pasangan Dinding 1/2 Bata 1:4 604.28 M³ AHSP PU A.4.4.1.9 Rp 111,017.88 Rp 67,085,881.51
c. Pasangan Dinding 1/2 Bata 1:2 (Selasar) 10.43 M³ AHSP PU A.4.4.1.7 Rp 121,261.00 Rp 1,264,752.23
d. Plasteran 1:2 selasar 20.86 M³ AHSP PU A.4.4.2.2 Rp 65,296.55 Rp 1,362,086.03
e. Plasteran 1:4 577.47 M³ AHSP PU A.4.4.2.4 Rp 59,271.30 Rp 34,227,397.61
jumlah Rp 121,474,457.98
F PLAT LANTAI
Beton K-250 30.83 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 31,636,440.41
Pembesian Tulangan Pokok Ø 12 4,208.66 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 73,003,081.53
Bekisting + Perawatan Beton 308.30 M³ AHSP PU A.4.1.1.24 Rp 371,800.00 Rp 114,625,940.00
jumlah Rp 219,265,461.94
G PLAT TANGGA
Beton K - 175 1.63 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 1,543,936.55
Pembesian Tulangan Pokok Ø 12 222.51 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,859,715.31
Bekisting + Perawatan 16.30 M² AHSP PU A.4.1.1.26 Rp 188,562.50 Rp 3,073,568.75
Anak Tangga
Beton K - 175 1.42 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 1,345,024.48
Pembesian Tulangan Ø 12 193.85 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,362,451.37
Bekisting + Perawatan 14.20 M³ AHSP PU A.4.1.1.26 Rp 188,562.50 Rp 2,677,587.50
jumlah Rp 15,862,283.96
H BALOK BORDES 18/25
Beton K-175 0.09 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 85,248.03
Pembesian Tulangan Pokok Ø 12 7.10 M³ AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 123,191.97
Pembesian Tulangan Sengkang Ø 8 4.31 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 74,783.69
Bekisting + Perawatan 0.86 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 141,591.83
Plat Bordes
Beton K-175 0.60 M³ AHSP PU A.4.1.1.5 Rp 947,200.34 Rp 568,320.20
Pembesian Tulangan Pokok Ø 12 81.91 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 1,420,754.10
Bekisting + Perawatan 6.00 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 987,850.00
jumlah Rp 3,401,739.82
I PEKERJAAN TANGGA DEPAN
a. Galian Tanah 16.98 M³ AHSP PU A.2.3.1.1 Rp 72,875.00 Rp 1,237,417.50
b. Beton cor 0.73 M³ AHSP PU A.4.1.1.2 Rp 879,561.41 Rp 642,079.83
c. Urugan pasir Tangga Depan 7.05 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 206,305.16
d. Pasir Alas 0.36 M³ AHSP PU A.2.3.1.11 Rp 29,263.14 Rp 10,534.73
jumlah Rp 2,096,337.22
I PEKERJAAN PLAFOND
a. plafond Gypsum Tebal 9 mm 274.42 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 17,441,586.36
b. plafond selasar 29.04 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 1,845,724.32
c. Rangka plafond 303.46 M² Taksir Rp 80,000.00 Rp 24,276,800.00
c. List profil Gypsum 303.46 M² Taksir Rp 7,000.00 Rp 2,124,220.00
jumlah Rp 45,688,330.68
J PEKERJAAN PENGECATAN
a. Cat Dinding 577.47 M² AHSP PU A.4.7.1.10 Rp 28,089.60 Rp 16,220,901.31
b. Cat plafond 303.46 M² Taksir Rp 22,000.00 Rp 6,676,120.00
jumlah Rp 22,897,021.31
K PEKERJAAN KUSEN
Kusen pintu tipe 1 ( 2 unit) 0.13 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,210,237.88
Daun pintu tipe 1 5.46 M² Taksir Rp 735,900.00 Rp 4,018,014.00
Kusen pintu tipe 2 ( 2 unit) 0.12 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,181,422.69
Daun pintu tipe 2 5.04 M² Taksir Rp 735,900.00 Rp 3,708,936.00
Kusen pintu tipe 3 ( 7 unit) 0.37 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 3,505,847.81
Daun pintu tipe 3 12.94 M² Taksir Rp 735,900.00 Rp 9,519,602.40
Kusen pintu tipe 4 ( 11 unit) 0.42 M² Taksir Rp 250,000.00 Rp 105,000.00
Daun pintu tipe 4 Aluminium 16.17 M² Taksir Rp 3,500,000.00 Rp 56,595,000.00
Kusen jendela tipe J1 (4 unit) 0.23 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 2,170,744.13
Daun jendela tipe 1 6.10 M² Taksir Rp 541,860.00 Rp 3,306,429.72
Kusen jendela tipe J2 (11 unit) 0.33 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 3,208,090.88
Daun jendela tipe J2 7.43 M² Taksir Rp 541,860.00 Rp 4,023,310.50
Kusen jendela tipe J3 (1 unit) 0.06 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 576,303.75
Daun jendela tipe J3 0.76 M² Taksir Rp 541,860.00 Rp 412,897.32
Kusen jendela tipe J4 (1 unit) 0.03 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 326,572.13
Kusen pintu/jendela tipe PJ1 (2 unit) 0.19 M² AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,863,382.13
Daun pintu/jendela tipe PJ1 19.94 M² Taksir Rp 541,860.00 Rp 10,801,979.10
Kusen ventilasi tipe V1 (9 unit) 0.15 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 107,933.21
Daun Ventilasi Kaca T 8 2.25 M² Taksir Rp 541,860.00 Rp 1,219,185.00
Kusen ventilasi tipe V2 ( 1 unit) 0.07 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 51,163.15
Daun Ventilasi Kaca T 8 0.85 M² Taksir Rp 541,860.00 Rp 460,581.00
Kusen ventilasi tipe V3 (3 unit) 0.07 M² AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 45,556.23
jumlah Rp 108,418,189.00

a. Lantai Keramik 20x20 (KM/WC) 33.90 M² Taksir Rp 36,900.00 Rp 1,250,910.00


b. Dinding 20x25 (KM/WC) 19.76 M² Taksir Rp 47,000.00 Rp 928,720.00
c. Lantai 40x40 529.21 M² AHSP PU A.4.4.3.35.c Rp 238,812.89 Rp 126,382,168.19
d. Lantai 40x40 Unpolisshed (Selasar) 25.89 M² AHSP PU A.4.4.3.35.c Rp 238,812.89 Rp 6,182,865.66
e. Keramik Anak Tangga 30x30 18.20 M² Taksir Rp 50,000.00 Rp 910,000.00
Jumlah Rp 135,654,663.85
II LANTAI II
A PEKERJAAN BETON lantai 11
Balok (25/40)
Beton K-250 19.40 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 19,907,458.45
Besi Tulangan Pokok Ø 14 1875.34 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 32,529,523.94
Besi Tulangan Sengkang Ø 8 589.78 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,230,203.34
Besi Tulangan Pinggang Ø 2 - 16 cm 937.67 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 16,264,761.97
Bekisting + Perawatan Beton 67.84 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 11,169,290.67
jumlah Rp 90,101,238.37
Balok (20/30)
Beton K-250 3.03 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 6,381,622.00
Besi Tulangan Pokok Ø 14 244.08 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 6,983,567.00
Besi Tulangan Sengkang Ø 8 - 10 cm 126.99 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 21,876,345.00
Besi Tulangan Pinggang Ø 12 71.73 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 1,244,238.89
Bekisting + Perawatan Beton 12.32 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 15,667,125.00
jumlah Rp 52,152,897.89
Balok Latai B3 (15/20)
Beton K-250 5.41 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 5,553,565.21
Besi Tulangan Pokok Ø 14 640.61 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 11,111,915.65
Besi Tulangan Sengkang Ø 8 - 10 cm 392.27 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 6,804,196.35
Bekisting + Perawatan Beton 63.14 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 10,395,474.83
jumlah Rp 33,865,152.04
Kolom K1 (35/35)
Beton K-250 9.60 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 9,851,113.46
Besi Tulangan Pokok Ø 14 757.56 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 13,140,476.74
Besi Tulangan Sengkang Ø 8 260.41 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 4,517,038.88
Besi Tulangan Pinggang Ø 14 378.78 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 6,570,238.37
Bekisting + Perawatan Beton 54.86 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 8,747,885.71
jumlah Rp 42,826,753.17
Kolom K3 (20/20)
Beton K-250 3.20 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 3,283,704.49
Besi Tulangan Pokok Ø 14 580.00 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 10,060,677.51
Besi Tulangan Sengkang Ø 8 137.05 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,377,331.25
Besi Tulangan Pinggang Ø 14 193.33 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 3,353,559.17
Bekisting + Perawatan Beton 32.00 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 5,102,933.33
jumlah Rp 24,178,205.75
Kolom K4 (13/13)
Beton K-250 1.37 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 1,405,835.98
Besi Tulangan Pokok Ø 14 287.87 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 4,993,283.97
Besi Tulangan Sengkang Ø 8 79.00 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 1,370,342.98
Besi Tulangan Pinggang - - - -
Bekisting + Perawatan Beton 21.08 M³ AHSP PU A.4.1.1.22 Rp 159,466.67 Rp 3,361,066.67
jumlah Rp 11,130,529.60
Reng Balok (20/30)
Beton K-250 12.28 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 12,601,215.97
Besi Tulangan Pokok Ø 12 908.47 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 15,758,306.09
Besi Tulangan Sengkang Ø 8 - 10 cm 687.78 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 11,930,088.27
Besi Tulangan Pinggang Ø 12 363.39 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 6,303,322.44
Bekisting + Perawatan Beton 57.31 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 9,435,065.11
jumlah Rp 56,027,997.88

Reng Balok (15/20)


Beton K-250 2.03 M³ AHSP PU A.4.1.1.8 Rp 1,026,157.65 Rp 2,083,100.03
Besi Tulangan Pokok Ø 12 240.29 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 4,167,994.97
Besi Tulangan Sengkang Ø 8 - 10 cm 147.14 Kg AHSP PU A.4.1.1.17 Rp 17,345.90 Rp 2,552,202.25
Bekisting + Perawatan Beton 10.49 M³ AHSP PU A.4.1.1.23 Rp 164,641.67 Rp 1,726,816.68
jumlah Rp 10,530,113.93
Total Keseluruhan Rp 320,812,888.63
B PEKERJAAN PASANGAN DAN PLASTERAN
a. Pasangan Dinding 1/2 Bata 1:4 580.00 M³ AHSP PU A.4.4.1.9 Rp 111,017.88 Rp 64,390,367.50
b. Plasteran 567.23 M³ AHSP PU A.4.4.2.4 Rp 59,271.30 Rp 33,620,459.50
jumlah Rp 98,010,827.00
C PEKERJAAN KUSEN
a. Kusen Pintu tipe 1 (1 Unit) 0.06 M³ AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 576,303.75
Daun Pintu tipe 1 2.73 M³ Taksir Rp 735,900.00 Rp 2,009,007.00
b. Kusen Pintu tipe 2 (3 Unit) 0.18 M³ AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,728,911.25
Daun Pintu tipe 2 7.56 M³ Taksir Rp 735,900.00 Rp 5,563,404.00
c. Kusen Pintu tipe 3 (7 Unit) 0.37 M³ AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 3,553,873.13
Daun Pintu tipe 3 12.94 M³ Taksir Rp 735,900.00 Rp 9,522,546.00
d. Kusen Pintu tipe 4 (9 unit) 0.34 M³ Taksir Rp 250,000.00 Rp 85,000.00
Daun Pintu tipe 4 13.32 M³ Taksir Rp 3,500,000.00 Rp 46,620,000.00
e. Kusen Jendela tipe J1 (3 Unit) 0.17 M³ AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 1,632,860.63
Daun Jendela tipe J1 4.58 M³ Taksir Rp 541,860.00 Rp 2,481,718.80
f. Kusen Jendela tipe J2 (10 Unit) 0.30 M³ AHSP PU A.4.6.1.1 Rp 9,605,062.50 Rp 2,881,518.75
Daun jendela tipe J2 7.43 M³ Taksir Rp 735,900.00 Rp 5,467,737.00
g. Kusen Ventilasi tipe V1 (7 Unit) 0.12 M³ AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 84,103.80
Daun Ventilasi tipe V1 2.25 M³ Taksir Rp 541,860.00 Rp 1,219,185.00
h. Kusen Ventilai tipe V3 0.04 M³ AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 28,034.60
i. Kusen Ventilasi V4 0.15 M³ AHSP PU A.4.6.1.10 Rp 700,865.00 Rp 105,129.75
Jumlah Rp 83,559,333.45
E PEKERJAAN PLAFOND
a. plafond Gypsum Tebal 9 mm 786.24 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 49,971,841.92
b. Plafond selasar 16.80 M² AHSP PU A.4.5.1.7 Rp 63,558.00 Rp 1,067,774.40
c. Rangka plafond 303.46 M² Taksir Rp 80,000.00 Rp 24,276,800.00
d. Total Volume list Profil 11.76 M² Taksir Rp 7,000.00 Rp 82,320.00
Jumlah Rp 75,398,736.32

F [EKERJAAN KERAMIK
a. Lantai Keramik 20x20 (KM/WC) 33.90 M² Taksir Rp 36,900.00 Rp 1,250,910.00
b. Dinding 20x25 (KM/WC) 19.76 M² Taksir Rp 47,000.00 Rp 928,720.00
c. Lantai 40x40 529.21 M² AHSP PU A.4.4.3.35.c Rp 238,812.89 Rp 126,382,168.19
Jumlah Rp 128,561,798.19
G PEKERJAAN PENGECATAN
a. Cat Dinding 567.23 M² AHSP PU A.4.7.1.10 Rp 28,089.60 Rp 15,933,263.81
b. Cat Plafond 361.03 M² Taksir Rp 22,000.00 Rp 7,942,660.00
Jumlah Rp 23,875,923.81
H PEKERJAAN ATAP
a. Rangka Kuda-Kuda kayu 7.38 M³ Taksir Rp 9,714,675.00 Rp 71,665,157.48
b. Atap seng Genteng 386.13 M² AHSP PU A.4.5.2.32 Rp 109,450.00 Rp 42,261,928.50
c. Rabung seng genteng 42.98 M 1 AHSP PU A.4.5.2.36 Rp 118,607.50 Rp 5,097,750.35
d. Lisplank 3/30 83 M1 AHSP PU A.4.6.1.22 Rp 98,230.00 Rp 8,153,090.00
Jumlah Rp 127,177,926.33

I PEMASANGAN KUNCI DAN PENGGANTUNG


a. Engsel Pintu 108.00 bh AHSP PU A.4.6.2.5 Rp 48,020.50 Rp 5,186,214.00
b. Kunci pintu 48.00 bh Taksir Rp 183,000.00 Rp 8,784,000.00
c. Pegangan pintu 48.00 bh Taksir Rp 183,000.00 Rp 8,784,000.00
d. Engsel jendela 89.00 bh AHSP PU A.4.6.2.6 Rp 48,020.50 Rp 4,273,824.50
e. Grendel jendela 57.00 bh AHSP PU A.4.6.2.10 Rp 29,870.50 Rp 1,702,618.50
f. Hak angin 57.00 bh AHSP PU A.4.6.2.6 Rp 48,020.50 Rp 2,737,168.50
Jumlah Rp 31,467,825.50
J PEKERJAAN ELEKTRIKAL
1. Pekerjaan instalasi stop kontak
a. Saklar 1 arah 8.00 bh Taksir Rp 7,500.00 Rp 60,000.00
b. Saklar 2 arah 18.00 bh Taksir Rp 8,000.00 Rp 144,000.00
c. Saklar 3 arah 3.00 bh Taksir Rp 8,000.00 Rp 24,000.00
2. Pekerjaan instalasi lampu
a. TL 2x36 W Louver in Bow Mark philip 14.00 bh Taksir Rp 170,000.00 Rp 2,380,000.00
b. PL 18 W 12.00 bh Taksir Rp 22,000.00 Rp 264,000.00
c. TL 2x18 W Louver in Bow Mark philip 32.00 bh Taksir Rp 70,000.00 Rp 2,240,000.00
d. E27 Down Light Ball x1 18 W in Bow 32.00 bh Taksir Rp 33,000.00 Rp 1,056,000.00
e. XL Philip 18 W 9.00 bh Taksir Rp 22,000.00 Rp 198,000.00
3. Pekerjaan instalasi panel
a. Box panel 2.00 bh Taksir Rp 1,500,000.00 Rp 3,000,000.00
b. kabel out put 2.00 m Taksir Rp 85,000.00 Rp 170,000.00
c. kabel input 2.00 m Taksir Rp 85,000.00 Rp 170,000.00
Jumlah Rp 9,706,000.00

K PEKERJAAN SANITASI
a. Kolset Duduk Keramik 8.00 bh AHSP PU A.5.1.1.2 Rp 692,251.25 Rp 5,538,010.00
b. Bak mandi fibre 8.00 bh AHSP PU A.5.1.1.10 Rp 589,100.00 Rp 4,712,800.00
c. Kran air 14.00 bh AHSP PU A.4.5.1.19 Rp 27,550.00 Rp 385,700.00
d. Floor drain 8.00 bh AHSP PU A.4.5.1.1.14 Rp 33,550.00 Rp 268,400.00
e. Wastefel 6.00 bh Taksir Rp 1,043,000.00 Rp 6,258,000.00
f. Pipa leiding (Ø 3/4) 18.40 M AHSP PU A.5.1.1.26 Rp 88,178.00 Rp 1,622,475.20
g. Pipa PVC (Ø 4) 60.00 M AHSP PU A.5.1.1.32 Rp 161,455.00 Rp 9,687,300.00
Jumlah Rp 28,472,685.20
1

Rp 193,597,025.14

Rp 446,012,756.54

Rp 925,168,065.21

Rp 238,812.89

Rp 238,812.89
Rp 50,000.00

Rp 320,812,888.63

LANJUTAN

Rp 128,561,798.19

64,280,899.10
AHSP PU A.4.4.3.35

lanjutan

228,000.00
Rp 6,138,000.00
3,340,000.00
REKAPITULASI BILL OF QUANTITY
Jumlah Harga
No. Uraian %
(Rp.)
1 2 3 4.00
PEKERJAAN PERSIAPAN Rp 18,696,805.60 0.78
PEKERJAAN TANAH Rp 36,008,665.33 1.50

I LANTAI I

A PEKERJAAN BETON BERTULANG Rp 925,168,065.21 38.43


B STRUKTUR PONDASI Rp 193,597,025.14 8.04
B PEKERJAAN DINDING DAN PLASTERAN Rp 121,474,457.98 5
C PEKERJAAN LANTAI DAN KERAMIK Rp 135,654,663.85 5.63
D PEKERJAAN PLAFOND Rp 45,688,330.68 1.90
E PEKERJAAN KUSEN Rp 108,418,189.00 4.50
G PEKERJAAN PENGECATAN Rp 22,897,021.31 0.95

II LANTAI II

A PEKERJAAN BETON BERTULANG Rp 320,812,888.63 13.33


B PEKERJAAN DINDING DAN PLASTERAN Rp 98,010,827.00 4.07
C PEKERJAAN LANTAI DAN KERAMIK Rp 128,561,798.19 5.34
D PEKERJAAN PLAFOND Rp 75,398,736.32 3.13
E PEKERJAAN KUSEN Rp 83,559,333.45 3.47
F PEKERJAAN KUNCI DAN PENGGANTUNG LT 1 DAN 2 Rp 31,467,825.50 1.31
G PEKERJAAN PENGECATAN Rp 23,875,923.81 0.99
H PEKERJAAN INTALASI LISTRIK Rp 9,706,000.00 0.40
I PEKERJAAN SANITAIR Rp 28,472,685.20 1.18

Jumlah 2,407,469,242.20 100


Pajak Pertambahan Nilai (PPN 10%) Rp 240,746,924.22
Jumlah Total Rp 2,648,216,166.42
Dibulatkan Rp 2,648,217,000.00

Terbilang : DUA MILYAR ENAM RATUS EMPAT PULUH DELAPAN JUTA DUA RATUS TUJUH BELAS RIBU RUPIAH
ANALISA TEKNIS

PEKERJAAN BANGUNAN LANTAI I


A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan AHSP PU.A.2.2.1.9
Volume (V) = 557.27 m²
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.15
1 1
Produktifitas = = = 6.6666667 m¹/org/hari
N 0.150

V 557.27
Durasi Pelaksanaan (D) = = = 2.09 = 2 hari
nxP 40 x 6.67

2. Pemasangan Bouwplank AHSP PU.A.2.2.1.4


Volume (V) = 91.58 m¹
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.215
1 1
Produktifitas = = = 4.65 m¹/org/hari
N 0.215

V 91.58
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 18 x 4.65

Waktu Pekerjaan Untuk Pekerjaan Persiapan 3 hari

B. PEKERJAAN TANAH
1. Galian Tanah Pondasi Tapak AHSP PU A.2.3.1.2
Volume (V) = 193.88 m³
Jumlah Tenaga Kerja (n) = 58 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.945
1 1 1.06 m³/org/hari
Produktifitas = = =
N 0.945

V 193.88
Durasi Pelaksanaan (D) = = = 3.16 = 3 hari
nxP 58 x 1.06

2. Galian Tanah Pondasi Menerus AHSP PU A.2.3.1.1


Volume (V) = 61.17 m³
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.775
1 1 1.29 m³/org/hari
Produktifitas = = =
N 0.775

Durasi Pelaksanaan (D) = V = 61.17 = 1.19 = 1 hari


nxP 40 x 1.29

3. Urugan Kembali Galian Pondasi Tapak AHSP PU A.2.3.1.9


Volume (V) = 145.40 m³
Jumlah Tenaga Kerja (n) = 23 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.333
1 1
Produktifitas = = = 3.00 m³/org/hari
N 0.333

V 145.40
Durasi Pelaksanaan (D) = = = 2.11 = 2 hari
nxP 23 x 3.00
4. Urugan Kembali Galian Pondasi Menerus AHSP PU A.2.3.1.9
Volume (V) = 15.29 m³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.333
1 1
Produktifitas = = = 3.00 m³/org/hari
N 0.333

V 15.29
Durasi Pelaksanaan (D) = = = 1.02 = 1 hari
nxP 5 x 3.00

5. Pasangan Batu Kosong Pondasi Tapak AHSP PU A.3.2.1.9


Volume (V) = 11.09 m³
Jumlah Tenaga Kerja (n) = 12 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.248
1 1
Produktifitas = = = 0.80 m³/org/hari
N 1.248

V 11.09
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 12 x 0.80

6. Pasangan Batu Kosong Pondasi Menerus AHSP PU A.3.2.1.9


Volume (V) = 8.88 m³
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.248
1 1
Produktifitas = = = 0.80 m³/org/hari
N 1.248

V 8.88
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.80

7. Timbunan Pasir Bawah Pondasi Tapak AHSP PU A.2.3.1.11


Volume (V) = 5.55 m³
Jumlah Tenaga Kerja (n) = 2 orang (taksir)
Indeks Tenaga Kerja (N) = 0.31

1 1
Produktifitas = = = 3.2258065 m³/org/hari
N 0.310

V 5.55
Durasi Pelaksanaan (D) = = = 0.86 = 1 hari
nxP 2 x 3.23

8. Timbunana Pasir Bawah Pondasi Menerus AHSP PU A.2.3.1.11


Volume (V) = 3.07 m³
Jumlah Tenaga Kerja (n) = 1 orang (taksir)
Indeks Tenaga Kerja (N) = 0.31

1 1
Produktifitas = = = 3.2258065 m³/org/hari
N 0.310

V 3.07
Durasi Pelaksanaan (D) = = = 0.95 = 1 hari
nxP 1 x 3.23

Waktu Pekerjaan Untuk Pekerjaan Tanah 11 hari


C. PEKERJAAN STRUKTUR PONDASI
1 PONDASI TAPAK tipe 1 AHSP PU A.4.1.1.8
a Beton K-250
Volume (V) = 52.49 m³
Jumlah Tenaga Kerja (n) = 50 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 m³/org/hari
N 2.036

V 52.49
Durasi Pelaksanaan (D) = = = 2.14 = 2 hari
nxP 50 x 0.49

Pembesian Dengan Besi Polos Tulangan Pokok Ø 16 AHSP PU A.4.1.1.17


Volume (V) = 4139.9 kg
Jumlah Tenaga Kerja (n) = 30 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.0150
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 4139.92
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 30 x 66.67

Pemasangan Bekisting Pondasi + Perawatan Beton AHSP PU A.4.1.1.20


Volume (V) = 131.22 m²
Jumlah Tenaga Kerja (n) = 52 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832

V 131.22
Durasi Pelaksanaan (D) = = = 2.10 = 2 hari
nxP 52 x 1.20

2 PONDASI TAPAK tipe 2 AHSP PU A.4.1.1.8


a Beton K-250
Volume (V) = 4.85
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036 m³
1 1
Produktifitas = = = 0.49 m³/org/hari
N 2.036

V 4.85
Durasi Pelaksanaan (D) = = = 1.23 = 1 hari
nxP 8 x 0.49

Pembesian Dengan Besi polos Tulangan Pokok Ø 14 AHSP PU A.4.1.1.17


Volume (V) = 234.4 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 234.40
Durasi Pelaksanaan (D) = = = 1.17 = 1 hari
nxP 3 x 66.67
Pemasangan Bekisting Pondasi + Perawatan Beton AHSP PU A.4.1.1.20
Volume (V) = 9.70 m²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832

V 9.70
Durasi Pelaksanaan (D) = = = 1.01 = 1 hari
nxP 8 x 1.20

Waktu Perkerjaan Untuk Struktur Pondasi 9 hari

D. PEKERJAAN BETON
1. Sloof 25/40 AHSP PU A.4.1.1.8
Beton K-250
Volume (V) = 7.22 m3
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 7.22
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 13 x 0.49

Besi Tulangan Pokok Ø 16 Polos AHSP PU A.4.1.1.17


Volume (V) = 797.64 kg
Jumlah Tenaga Kerja (n) = 12 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 797.64
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 12 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 3279.31 kg
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 3279.31
Durasi Pelaksanaan (D) = = = 2.0 = 2 hari
nxP 25 x 66.67

Besi Tulangan Pinggang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 174.48 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 174.48
Durasi Pelaksanaan (D) = = = 0.87 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 28.88 m²
Jumlah Tenaga Kerja (n) = 23 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832

V 28.88
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 23 x 1.20

2. Sloof 20/30 AHSP PU A.4.1.1.8


Beton K-250
Volume (V) = 4.07 m3
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 4.07
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 8 x 0.49

Besi Tulangan Pokok Ø 16 Polos AHSP PU A.4.1.1.17


Volume (V) = 535.02 kg
Jumlah Tenaga Kerja (n) = 7 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 535.02
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 7 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 227.84 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 227.84
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 3 x 66.67

Besi Tulangan Pinggang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 163.85 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 163.85
Durasi Pelaksanaan (D) = = = 0.82 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 20.34 m²
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832

V 20.34
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 15 x 1.20

3. Sloof gantung 25/40 AHSP PU A.4.1.1.8


Beton K-250
Volume (V) = 13.26 m3
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 13.26
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 25 x 0.49

Besi Tulangan Pokok Ø 16 Polos AHSP PU A.4.1.1.17


Volume (V) = 1464.92 kg
Jumlah Tenaga Kerja (n) = 20 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 1464.92
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 20 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 6022.66 kg
Jumlah Tenaga Kerja (n) = 31 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 6022.66
Durasi Pelaksanaan (D) = = = 2.9 = 3 hari
nxP 31 x 66.67

Besi Tulangan Pinggang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 320.45 kg
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 320.45
Durasi Pelaksanaan (D) = = = 1.20 = 1 hari
nxP 4 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.21
Volume (V) = 53.04 m3
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.832
1 1
Produktifitas = = = 1.20 m²/org/hari
N 0.832

V 53.04
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 40 x 1.20

4 Kolom K1 35/35 AHSP PU A.4.1.1.8


Beton K-250
Volume (V) = 16.07 m3
Jumlah Tenaga Kerja (n) = 30 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 16.07
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 30 x 0.49

Besi Tulangan Pokok Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 1268.27 kg
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 1268.27
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 18 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 435.97 kg
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 435.97
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 6 x 66.67

Besi Tulangan Pinggang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 634.14 kg
Jumlah Tenaga Kerja (n) = 9 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 634.14
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 9 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.22
Volume (V) = 91.84 m3
Jumlah Tenaga Kerja (n) = 45 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056

V 91.84
Durasi Pelaksanaan (D) = = = 2.16 = 2 hari
nxP 45 x 0.95

5 Kolom K2 30/60 AHSP PU A.4.1.1.8


Beton-K250
Volume (V) = 23.62 m3
Jumlah Tenaga Kerja (n) = 23 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.0360
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.0360

V 23.62
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 23 x 0.49

Besi Tulangan Pokok Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 951.2 kg
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 951.21
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 13 x 66.67

Besi Tulangan Sengkang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 584.23 kg
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 584.23
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 8 x 66.67

Besi Tulangan Pinggang Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 1268.27 kg
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 1268.27
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 18 x 66.67
Bekisting Perawatan Beton AHSP PU A.4.1.1.22
Volume (V) = 118.08 m3
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056

V 118.08
Durasi Pelaksanaan (D) = = = 3.12 = 3 hari
nxP 40 x 0.95

6. Kolom K4 13/13 AHSP PU A.4.1.1.8


Beton-K250
Volume (V) = 2.77 m3
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.0360
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.0360

V 2.77
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 5 x 0.49

Besi Tulangan Pokok Ø 14 Polos AHSP PU A.4.1.1.17


Volume (V) = 582.03 kg
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 582.03
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 8 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 159.73 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 159.73
Durasi Pelaksanaan (D) = = = 0.80 = 1 hari
nxP 3 x 66.67

Bekisting Perawatan Beton AHSP PU A.4.1.1.22


Volume (V) = 42.62 m2
Jumlah Tenaga Kerja (n) = 38 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056

V 42.62
Durasi Pelaksanaan (D) = = = 1.18 = 1 hari
nxP 38 x 0.95
7. Pelat Lantai AHSP PU A.4.1.1.8
Beton K-250
Volume (V) = 30.83 m3
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

Durasi Pelaksanaan (D) = V 30.83


= = 1.18 = 1 hari
nxP 53 x 0.49

Besi Tulangan Pokok Ø 12 Polos AHSP PU A.4.1.1.17


Volume (V) = 4208.7 kg
Jumlah Tenaga Kerja (n) = 30 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 4208.66
Durasi Pelaksanaan (D) = = = 2.1 = 2 hari
nxP 30 x 66.67

Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.24


Volume (V) = 308.30 m²
Jumlah Tenaga Kerja (n) = 63 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056

V 308.30
Durasi Pelaksanaan (D) = = = 5.2 = 5 hari
nxP 63 x 0.95

8. Pelat Tangga AHSP PU A.4.1.1.5


Beton K-175
Volume (V) = 1.63 m3
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 1.63
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 3 x 0.49

Besi Tulangan Pokok Ø 12 Polos AHSP PU A.4.1.1.17


Volume (V) = 222.51 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 222.51
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 3 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.26
Volume (V) = 16.30 m2
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056
V 16.30
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 15 x 0.95

a. Anak Tangga AHSP PU A.4.1.1.5


Beton K-175
Volume (V) = 1.42 m3
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 kg/org/hari
N 2.036

V 1.42
Durasi Pelaksanaan (D) = = = 0.96 = 1 hari
nxP 3 x 0.49

Besi Tulangan Pokok Ø 12 Polos AHSP PU A.4.1.1.17


Volume (V) = 193.85 kg
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 193.85
Durasi Pelaksanaan (D) = = = 0.97 = 1 hari
nxP 3 x 66.67

Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.26


Volume (V) = 14.20 m2
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m³/org/hari
N 1.056
V 14.20
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 15 x 0.95

9. Balok Bordes 18/25 AHSP PU A.4.1.1.5


Beton K-175
Volume ( V ) = 0.09 m3
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 m²/org/hari
N 2.036

V 0.09
Durasi Pelaksanaan (D) = = = 0.2 = 1 hari
nxP 1 x 0.49
Besi Tulangan Pokok Ø 12 AHSP PU A.4.1.1.17
Volume (V) = 7.10 kg
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 kg/org/hari
N 0.015

V 7.10
Durasi Pelaksanaan (D) = = = 0.11 = 1 hari
nxP 1 x 66.67

Besi Tulangan Sengkang Ø 8 Polos AHSP PU A.4.1.1.17


Volume (V) = 4.31 kg
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m²/org/hari
N 0.015

V 4.31
Durasi Pelaksanaan (D) = = = 0.06 = 1 hari
nxP 1 x 66.67

Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.23


Volume (V) = 0.86 m²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056

V 0.86
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 1 x 0.95

10. Pelat Bordes AHSP PU A.4.1.1.5


Beton K-175
Volume (V) = 0.60 m²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 m²/org/hari
N 2.036

V 0.60
Durasi Pelaksanaan (D) = = = 1.22 = 1 hari
nxP 1 x 0.49

Besi Tulangan Pokok Ø 12 Polos AHSP PU A.4.1.1.17


Volume (V) = 81.91 kg
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktifitas = = = 66.67 m³/org/hari
N 0.015

V 81.91
Durasi Pelaksanaan (D) = = = 1.23 = 1 hari
nxP 1 x 66.67
Bekisting Dan Perawatan Beton AHSP PU A.4.1.1.23
Volume (V) = 6.00 m²
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktifitas = = = 0.95 m²/org/hari
N 1.056

V 6.00
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 6 x 0.95

Waktu Pekerjaan Untuk Pekerjaan Beton = 71 hari

E. PEKERJAAN PASANGAN DAN PELASTERAN AHSP PU A.4.4.1.7


a. Pasangan Dinding 1/2 Bata 1Pc : 2Ps
Volume (V) = 144.60 m2
Jumlah Tenaga Kerja (n) = 31 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.425
1 1
Produktifitas = = = 2.35 kg/org/hari
N 0.425

V 144.60
Durasi Pelaksanaan (D) = = = 2.0 = 2 hari
nxP 31 x 2.35

b. Pasangan Dinding 1/2 Bata 1Pc : 2Ps Selasar AHSP PU A.4.4.1.7


Volume (V) = 10.43 m²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.425
1 1
Produktifitas = = = 2.35 m²/org/hari
N 0.425

V 10.43
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 4 x 2.35

c. Pasangan Dinding 1/2 Bata 1Pc :4Ps AHSP PU A.4.4.1.9


Volume (V) = 604.28 m2
Jumlah Tenaga Kerja (n) = 63 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.425
1 1
Produktifitas = = = 2.35 m³/org/hari
N 0.425

V 604.28
Durasi Pelaksanaan (D) = = = 4.08 = 4 hari
nxP 63 x 2.35

d. Pelasteran 1Pc : 2Ps AHSP PU A.4.4.2.2


Volume (V) = 20.86 m²
Jumlah Tenaga Kerja (n) = 9 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.480
1 1
Produktifitas = = = 2.08 m²/org/hari
N 0.480

V 20.86
Durasi Pelaksanaan (D) = = = 1.1 = 1 hari
nxP 9 x 2.08
e. Pelasteran 1Pc : 4Ps AHSP PU A.4.4.2.4
Volume (V) = 577.47 m²
Jumlah Tenaga Kerja (n) = 65 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.480
1 1
Produktifitas = = = 2.08 m²/org/hari
N 0.480

V 577.47
Durasi Pelaksanaan (D) = = = 4.3 = 4 hari
nxP 65 x 2.08

Waktu Pekerjaan Untuk Pekerjaan Pasangan Dan Pelasteran 12 hari

F. PEKERJAAN TANGGA DEPAN AHSP PU A.2.3.1.1


a. Galian Tanah
Volume (V) = 16.98 m³
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.775
1 1 1.29 m³/org/hari
Produktifitas = = =
N 0.775

V
Durasi Pelaksanaan (D) = = = 0.00 = 1 hari
nxP 13 x 1.29

Beton K-125 AHSP PU A.4.1.1.2


Volume ( V ) = 0.73 m3
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktifitas = = = 0.49 m²/org/hari
N 2.036

V 0.73
Durasi Pelaksanaan (D) = = = 0.74 = 1 hari
nxP 2 x 0.49

Urugan pasir Tangga Depan AHSP PU A.2.3.1.11


Volume ( V ) = 7.05 m3
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.310
1 1
Produktifitas = = = 3.23 m²/org/hari
N 0.310

V 7.05
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 2 x 3.23

Pasair Alas AHSP PU A.2.3.1.11


Volume ( V ) = 0.36 m3
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.310
1 1
Produktifitas = = = 3.23 m²/org/hari
N 0.310

V 0.36
Durasi Pelaksanaan (D) = = = 0.1 = 1 hari
nxP 1 x 3.23

Waktu Pekerjaan Untuk Pekerjaan Tangga Depan 4 hari


G. PEKERJAAN PELAFOND
a. Rangka Pelafond Taksir
Volume (V) = 303.46 m2
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Pelafond Gypsum Tebal 9 mm AHSP PU A.4.5.1.7


Volume (V) = 274.42 m2
Jumlah Tenaga Kerja (n) = 38 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.160
1 1
Produktifitas = = = 6.25 kg/org/hari
N 0.160

V 274.42
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 38 x 6.25

c. Pelafond Selasar AHSP PU A.4.5.1.7


Volume (V) = 29.04 m2
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.160
1 1
Produktifitas = = = 6.25 kg/org/hari
N 0.160

V 29.04
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 4 x 6.25

d. List Pelafond Taksir


Volume (V) = 303.46 m1
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

Waktu Pekerjaan Utuk Pekerjaan Pelafond 4 hari

H. PEKERJAAN KUSEN
a. Kusen Pintu tipe 1 (2 unit) AHSP PU A.4.6.1.1
Volume = 0.13 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.13
Durasi Pelaksanaan (D) = = = 0.96 = 1 hari
nxP 4 x 0.03
Daun pintu 1 Taksir
Volume = 5.46 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Kusen pintu tipe 2 (2 unit) AHSP PU A.4.6.1.1


Volume = 0.12 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.12
Durasi Pelaksanaan (D) = = = 0.94 = 1 hari
nxP 4 x 0.03

Daun pintu 2 (2 unit) Taksir


Volume = 5.04 M²
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Kusen pintu tipe 3 (7 unit) AHSP PU A.4.6.1.1


Volume = 0.37 M²
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.37
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.03

Daun pintu tipe 3 Taksir


Volume = 12.94 M²
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Waktu yang dibutuhkan
= 1 hari
d. Kusen pintu tipe 4 (11 unit ) Taksir
Volume = 0.42 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.131
Waktu yang dibutuhkan = 1 hari

Daun pintu tipe 4 Aluminium Taksir


Volume (V) = 16.17 M²
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
e. Kusen jendela tipe J1 (4 unit ) AHSP PU A.4.6.1.1
Volume = 0.23 M²
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.23
Durasi Pelaksanaan (D) = = = 1.15 = 1 hari
nxP 6 x 0.03

Daun jendela tipe J1 (4 unit) Taksir


Volume = 6.10 M²
Jumlah Tenaga Kerja (n) = 20 Orang (taksir)
Indeks Tenaga Kerja (N) = 3.480
1 1
Produktivitas = = = 0.29 m²/org/hari
N 3.480

V 6.10
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 20 x 0.29

f. Kusen jendela J2 AHSP PU A.4.6.1.1


Volume = 0.33 M²
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.33
Durasi Pelaksanaan (D) = = = 1.02 = 1 hari
nxP 10 x 0.03

Daun jendala J2 Taksir


Volume = 7.43 M²
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 3.480
1 1
Produktivitas = = = 0.29 m²/org/hari
N 3.480

V 7.43
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 25 x 0.29

g. Kusen jendela tipe J3 (1 Unit ) AHSP PU A.4.6.1.1


Volume = 0.06 M²
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.06
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 2 x 0.03

Daun jendela tipe J3


Volume (V) = 0.76 M²
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
h. Kusen jendela tipe J4 AHSP PU A.4.6.1.1
Volume = 0.03 M²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.03
Durasi Pelaksanaan (D) = = = 0.002 = 1 hari
nxP 1 x 0.03

i Kusen pintu/jendela tipe pj1 AHSP PU A.4.6.1.1


Volume = 0.19 M²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.137
1 1
Produktivitas = = = 7.30 m²/org/hari
N 0.137

V 0.19
Durasi Pelaksanaan (D) = = = 0.03 = 1 hari
nxP 1 x 7.30

Daun pintu/jendela tipe Pj1


Volume (V) = 19.94 M²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

j. Kusen vantilasi tipe V1 (9 unit ) AHSP PU A.4.6.1.10


Volume = 0.15 M²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 3.205
1 1
Produktivitas = = = 0.31 m²/org/hari
N 3.205

V 0.15
Durasi Pelaksanaan (D) = = = 0.49 = 1 hari
nxP 1 x 0.31

Daun vantilasi kaca T 8


Volume (V) = 2.25 M²
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
k Kusen vantilasi tipe V2 (1 unit) AHSP PU A.4.6.1.10
Volume = 0.07 M²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 3.205
1 1
Produktivitas = = = 0.31 m²/org/hari
N 3.205

V 0.07
Durasi Pelaksanaan (D) = = = 0.23 = 1 hari
nxP 1 x 0.31

Daun vantilasi kaca T 8


Volume (V) = 0.85 M²
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

l Kusen vantilasi tipe V2 (1 unit) AHSP PU A.4.6.1.10


Volume = 0.07 M²
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 3.205
1 1
Produktivitas = = = 0.31 m²/org/hari
N 3.205

V 0.07
Durasi Pelaksanaan (D) = = = 0.22 = 1 hari
nxP 1 x 0.31

Waktu Pekerjaan Utuk Pekerjaan Kusen 22 hari

I PEKERJAAN KERAMIK LANTAI 1


a. Lantai Keramik 20 x 20 (KM/WC) Taksir
Volume = 33.90 M²
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Dinding 20 x 25 (KM/MC) Taksir


Volume (V) = 19.76 M²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Keramik Lantai 40 x 40 AHSP PU A.4.4.3.35.c


Volume = 529.21 M²
Jumlah Tenaga Kerja (n) = 60 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120

V 529.21
Durasi Pelaksanaan (D) = = = 9.88 = 10 hari
nxP 60 x 0.89
d Keramik 40 x 40 Unpolisshed (Selasar) AHSP PU A.4.4.3.35.c
Volume = 25.89 M²
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120

V 25.89
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 25 x 0.89

e Keramik 30 x 30 Anak Tangga Taksir


Volume = 18.20 M²
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

Waktu Pekerjaan Utuk Pekerjaan balok = 14


II LANTAI II
PEKERJAAN BETON
a. Balok 25/40
Beton K-250 AHSP PU A.4.1.1.8
Volume = 19.40 M³
Jumlah Tenaga Kerja (n) = 35 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 19.40
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 35 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 1875.34 M³
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 1875.34
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 25 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 589.78 M³
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 589.78
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 8 x 66.67
Besi Pinggang Polos Ø 2 - 16 AHSP PU A.4.1.1.17
Volume = 937.67 M³
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 937.67
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 13 x 66.67

Bekisting + perawatan Beton AHSP PU A.4.1.1.23


Volume = 67.84 M³
Jumlah Tenaga Kerja (n) = 35 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 67.84
Durasi Pelaksanaan (D) = = = 2.05 = 2 hari
nxP 35 x 0.95

b. Balok (20/30) AHSP PU A.4.1.1.8


Beton K-250
Volume = 3.03 M³
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 3.03
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 6 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 244.08 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 244.08
Durasi Pelaksanaan (D) = = = 0.92 = 1 hari
nxP 4 x 66.67

Besi Sengkang Polos Ø 8 - 10 AHSP PU A.4.1.1.17


Volume = 126.99 M³
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 126.99
Durasi Pelaksanaan (D) = = = 0.95 = 1 hari
nxP 2 x 66.67
Besi Pinggang Polos Ø 12 AHSP PU A.4.1.1.17
Volume = 71.73 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 71.73
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 1 x 66.67

Bekisting + perawatan Beton AHSP PU A.4.1.1.23


Volume = 12.32 M³
Jumlah Tenaga Kerja (n) = 12 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 12.32
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 12 x 0.95

Waktu Pekerjaan Utuk Pekerjaan balok = 11

a Balok Latai B3 (15/20) AHSP PU A.4.1.1.8


Beton K-250
Volume = 5.41 M³
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 5.41
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 10 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 640.61 M³
Jumlah Tenaga Kerja (n) = 9 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 640.61
Durasi Pelaksanaan (D) = = = 1.07 = 1 hari
nxP 9 x 66.67

Besi Sengkang Polos Ø 8 - 10 AHSP PU A.4.1.1.17


Volume = 392.27 M³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 392.27
Durasi Pelaksanaan (D) = = = 1.18 = 1 hari
nxP 5 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.23
Volume = 63.14 M³
Jumlah Tenaga Kerja (n) = 30 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 63.14
Durasi Pelaksanaan (D) = = = 2.22 = 2 hari
nxP 30 x 0.95

b Kolom k1 35/35
Beton K-250 AHSP PU A.4.1.1.8
Volume = 9.60 M³
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 9.60
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 18 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 757.56 M³
Jumlah Tenaga Kerja (n) = 11 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 757.56
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 11 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 260.41 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 260.41
Durasi Pelaksanaan (D) = = = 0.98 = 1 hari
nxP 4 x 66.67

Besi Pinggang Polos Ø 14 AHSP PU A.4.1.1.17


Volume = 378.78 M³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 378.78
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 5 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.22
Volume = 54.86 M³
Jumlah Tenaga Kerja (n) = 28 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 54.86
Durasi Pelaksanaan (D) = = = 2.07 = 2 hari
nxP 28 x 0.95

c Kolom K3 (20 x 20)


Beton K-250 AHSP PU A.4.1.1.8
Volume = 3.20 M³
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 3.20
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 6 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 580.0 M³
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 580.00
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 8 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 137.05 M³
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 137.05
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 2 x 66.67

Besi Pinggang Polos Ø 14 AHSP PU A.4.1.1.17


Volume = 193.33 M³
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 193.33
Durasi Pelaksanaan (D) = = = 0.97 = 1 hari
nxP 3 x 66.67
Bekisting + perawatan Beton AHSP PU A.4.1.1.22
Volume = 32.0 M³
Jumlah Tenaga Kerja (n) = 32 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 32.00
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 32 x 0.95

d Kolom K4 (13 x13)


Beton K-250 AHSP PU A.4.1.1.8
Volume = 1.37 M³
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 1.37
Durasi Pelaksanaan (D) = = = 0.93 = 1 hari
nxP 3 x 0.49

Besi Tulangan pokok Ø 14 AHSP PU A.4.1.1.17


Volume = 287.87 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 287.87
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 4 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 79.0 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 79.00
Durasi Pelaksanaan (D) = = = 1.19 = 1 hari
nxP 1 x 66.67

Bekisting + perawatan Beton AHSP PU A.4.1.1.22


Volume = 21.08 M³
Jumlah Tenaga Kerja (n) = 20 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 21.08
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 20 x 0.95
e Reng Balok (20/30)
Beton K-250 AHSP PU A.4.1.1.8
Volume = 12.28 M³
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 12.28
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 25 x 0.49

Besi Tulangan pokok Ø 12 AHSP PU A.4.1.1.17


Volume = 908.47 M³
Jumlah Tenaga Kerja (n) = 13 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 908.47
Durasi Pelaksanaan (D) = = = 1.05 = 1 hari
nxP 13 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 687.78 M³
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 687.78
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 10 x 66.67

Besi Pingggang Polos Ø 12 AHSP PU A.4.1.1.17


Volume = 363.39 M³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 363.39
Durasi Pelaksanaan (D) = = = 1.09 = 1 hari
nxP 5 x 66.67

Bekisting + perawatan Beton AHSP PU A.4.1.1.23


Volume = 57.31 M³
Jumlah Tenaga Kerja (n) = 28 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 57.31
Durasi Pelaksanaan (D) = = = 2.16 = 2 hari
nxP 28 x 0.95
f Reng Balok (15/20)
Beton K-250 AHSP PU A.4.1.1.8
Volume = 2.03 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 2.036
1 1
Produktivitas = = = 0.49 m²/org/hari
N 2.036

V 2.03
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 4 x 0.49

Besi Tulangan pokok Ø 12 AHSP PU A.4.1.1.17


Volume = 240.29 M³
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 240.29
Durasi Pelaksanaan (D) = = = 1.20 = 1 hari
nxP 3 x 66.67

Besi Sengkang Polos Ø 8 AHSP PU A.4.1.1.17


Volume = 147.14 M³
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.015
1 1
Produktivitas = = = 66.67 m²/org/hari
N 0.015

V 147.14
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 2 x 66.67

Bekisting + perawatan Beton AHSP PU A.4.1.1.23


Volume = 10.49 M³
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.056
1 1
Produktivitas = = = 0.95 m²/org/hari
N 1.056

V 10.49
Durasi Pelaksanaan (D) = = = 1.11 = 1 hari
nxP 10 x 0.95

Waktu Pekerjaan Untuk Pekerjaan Beton Lantai 11 = 30

B. PEKERJAAN PASANGAN DAN PLASTERAN


a. Pasangan Dinding 1/2 Bata 1:4 AHSP PU A.4.4.1.9
Volume = 580.00 M³
Jumlah Tenaga Kerja (n) = 49 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.425
1 1
Produktivitas = = = 2.35 m²/org/hari
N 0.425

V 580.00
Durasi Pelaksanaan (D) = = = 5.03 = 5 hari
nxP 49 x 2.35
b. Plasteran AHSP PU A.4.4.2.4
Volume = 567.23 M³
Jumlah Tenaga Kerja (n) = 54 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.480
1 1
Produktivitas = = = 2.08 m²/org/hari
N 0.480

V 567.23
Durasi Pelaksanaan (D) = = = 5.04 = 5 hari
nxP 54 x 2.08

Waktu Pekerjaan Untuk Pekerjaan Pemasangan dan Plasteran = 10 hari

C. PEKERJAAN KUSEN LANATAI 11


a Kusen Pintu tipe 1 AHSP PU A.4.6.1.1
Volume = 0.06 M³
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.06
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 2 x 0.03

Daun Pintu tipe 1 Taksir


Volume = 2.73 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = = 1 hari

b. Kusen Pintu tipe 2 ( 3 unit) AHSP PU A.4.6.1.1


Volume = 0.18 M³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.18
Durasi Pelaksanaan (D) = = = 1.10 = 1 hari
nxP 5 x 0.03

Daun Pintu tipe 2


Volume (V) = 7.56 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Kusen pintu tipe 3 (7 unit) AHSP PU A.4.6.1.1


Volume = 0.37 M³
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.37
Durasi Pelaksanaan (D) = = = 1.13 = 1 hari
nxP 10 x 0.03
Daun Pintu tipe3
Volume (V) = 12.94 M²
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

d. Kusen pintu tipe 4 (9 unit) AHSP PU A.4.2.1.11


Volume = 0.34 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.518
1 1
Produktivitas = = = 1.93 m²/org/hari
N 0.518

V 0.34
Durasi Pelaksanaan (D) = = = 0.18 = 1 hari
nxP 1 x 1.93

Daun Pintu tipe 4


Volume (V) = 13.32 bh
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

e Kusen Jendela tipe J1 ( 3 unit ) AHSP PU A.4.6.1.1


Volume = 0.17 M³
Jumlah Tenaga Kerja (n) = 5 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.17
Durasi Pelaksanaan (D) = = = 1.04 = 1 hari
nxP 5 x 0.03

Daun Pintu tipe J1


Volume (V) = 4.58 m
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

f Kusen Jendela tipe J2 ( 10 unit ) AHSP PU A.4.6.1.1


Volume = 0.30 M³
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.30
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 8 x 0.03
Daun Pintu tipe J2
Volume (V) = 7.43 0
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

g Kusen Jendela tipe V1 ( 7unit ) AHSP PU A.4.6.1.1


Volume = 0.12 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.12
Durasi Pelaksanaan (D) = = = 0.91 = 1 hari
nxP 4 x 0.03

Daun Pintu tipe V1


Volume (V) = 2.25 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

h Kusen Jendela tipe V3 AHSP PU A.4.6.1.1


Volume = 0.04 M³
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.04
Durasi Pelaksanaan (D) = = = 1.22 = 1 hari
nxP 1 x 0.03

i Kusen Jendela tipe V4 AHSP PU A.4.6.1.1


Volume = 0.15 M³
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Indeks Tenaga Kerja (N) = 30.450
1 1
Produktivitas = = = 0.03 m²/org/hari
N 30.450

V 0.15
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 4 x 0.03

Waktu Pekerjaan Utuk Pekerjaan Kusen = 15 hari

D PEKERJAAN PLAFOND
a. Rangka plafond AHSP PU A.4.6.1.20
Volume = 303.46 M²
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.540
1 1
Produktivitas = = = 1.85 m²/org/hari
N 0.540

V 303.46
Durasi Pelaksanaan (D) = = = 3.09 = 3 hari
nxP 53 x 1.85
b. Plafond Multyplek 4mm AHSP PU A.4.5.1.7
Volume = 786.24 M²
Jumlah Tenaga Kerja (n) = 40 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.160
1 1
Produktivitas = = = 6.25 m²/org/hari
N 0.160

V 786.24
Durasi Pelaksanaan (D) = = = 3.14 = 3 hari
nxP 40 x 6.25

c. Plafond luar atap 4mm AHSP PU A.4.5.1.7


Volume = 16.80 M²
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.160
1 1
Produktivitas = = = 6.25 m²/org/hari
N 0.160

V 16.80
Durasi Pelaksanaan (D) = = = 0.90 = 1 hari
nxP 3 x 6.25

d. Total Volume list Profil AHSP PU A.4.5.1.9


Volume = 11.76 M²
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.108
1 1
Produktivitas = = = 9.26 m²/org/hari
N 0.108

V 11.76
Durasi Pelaksanaan (D) = = = 0.64 = 1 hari
nxP 2 x 9.26

Waktu Pekerjaan Untuk Pekerjaan Plafond = 8 hari

E PEKERJAAN KERAMIK
a. Lantai Keramik 20 x20 (KM/WC) AHSP PU A.4.4.3.36
Volume = 33.90 M²
Jumlah Tenaga Kerja (n) = 35 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120

V 33.90
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 35 x 0.89

b. Dinding 20 x 25 (KM/WC)
Volume (V) = 19.76 M²
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
c. Lantai 40x40 AHSP PU A.4.4.3.34.a
Volume = 529.21 M²
Jumlah Tenaga Kerja (n) = 60 Orang (taksir)
Indeks Tenaga Kerja (N) = 1.120
1 1
Produktivitas = = = 0.89 m²/org/hari
N 1.120

V 529.21
Durasi Pelaksanaan (D) = = = 9.88 = 10 hari
nxP 60 x 0.89

Waktu Pekerjaan Untuk Pekerjaan Kramik = 12 hari

F PEKERJAAN PENGECATAN
a. Cat Dinding AHSP PU A.4.7.1.10
Volume = 567.23 M²
Jumlah Tenaga Kerja (n) = 45 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.092
1 1
Produktivitas = = = 10.89 m²/org/hari
N 0.092

V 567.23
Durasi Pelaksanaan (D) = = = 1.16 = 1 hari
nxP 45 x 10.89

b. Cat Plafond
Volume (V) = 361.00 M²
Jumlah Tenaga Kerja (n) = 20 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

Waktu Pekerjaan Untuk Pekerjaan Pengecatan = 2 hari

G PEKERJAAN ATAP
a Rangka Kuda-Kuda kayu AHSP PU A.4.6.1.14
Volume = 7.38 M³
Jumlah Tenaga Kerja (n) = 53 Orang (taksir)
Indeks Tenaga Kerja (N) = 29.145
1 1
Produktivitas = = = 0.03 m²/org/hari
N 29.145

V 7.38
Durasi Pelaksanaan (D) = = = 4.06 = 4 hari
nxP 53 x 0.03

b. Atap Seng Genteng AHSP PU A.4.5.2.32


Volume = 386.13 M²
Jumlah Tenaga Kerja (n) = 55 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.311
1 1
Produktivitas = = = 3.22 m²/org/hari
N 0.311

V 386.13
Durasi Pelaksanaan (D) = = = 2.18 = 2 hari
nxP 55 x 3.22
c. Rambung Genteng AHSP PU A.4.5.2.39.a
Volume = 42.98 M1
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.247
1 1
Produktivitas = = = 4.05 m²/org/hari
N 0.247

V 42.98
Durasi Pelaksanaan (D) = = = 1.06 = 1 hari
nxP 10 x 4.05

d. Lisplank 3/30 AHSP PU A.4.6.1.21


Volume = 83.00 M1
Jumlah Tenaga Kerja (n) = 25 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.325
1 1
Produktivitas = = = 3.08 m²/org/hari
N 0.325

V 83.00
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 25 x 3.08

Waktu Pekerjaan Untuk Pekerjaan Atap = 8 hari

H PEMASANGAN KUNCI DAN PENGGANTUNG


a. Engsel Pintu AHSP PU A.4.6.2.5
Volume = 108.00 M1
Jumlah Tenaga Kerja (n) = 18 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.181
1 1
Produktivitas = = = 5.53 m²/org/hari
N 0.181

V 108.00
Durasi Pelaksanaan (D) = = = 1.08 = 1 hari
nxP 18 x 5.53

b. Kunci Pintu
Volume (V) = 48.00 bh
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Pegangan Pintu
Volume (V) = 48.00 bh
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
d. Engsel Jendela AHSP PU A.4.6.2.6
Volume = 89.00 bh
Jumlah Tenaga Kerja (n) = 15 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.181
1 1
Produktivitas = = = 5.53 m²/org/hari
N 0.181

V 89.00
Durasi Pelaksanaan (D) = = = 1.07 = 1 hari
nxP 15 x 5.53

e. Grendel Jendela AHSP PU A.4.6.2.4


Volume = 57.00 bh
Jumlah Tenaga Kerja (n) = 28 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.558
1 1
Produktivitas = = = 1.79 m²/org/hari
N 0.558

V 57.00
Durasi Pelaksanaan (D) = = = 1.14 = 1 hari
nxP 28 x 1.79

f. Hak angin AHSP PU A.4.6.2.9


Volume = 57.00 bh
Jumlah Tenaga Kerja (n) = 10 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.181
1 1
Produktivitas = = = 5.53 m²/org/hari
N 0.181

V 57.00
Durasi Pelaksanaan (D) = = = 1.03 = 1 hari
nxP 10 x 5.53

Waktu Pekerjaan Untuk Pekerjaan Kunci dan Penggantung = 5 hari

III PEKERJAAN ELEKTRIKAL LANTAI I DAN II


1 Pekerjaan insatalasi stop kontak
a. Saklar 1 arah
Volume (V) = 8.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Saklar 2 arah
Volume (V) = 18.00 bh
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Saklar 3 arah
Volume (V) = 3.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari
2 Pekerjaan instalasi lampu
a. TL 2x36 W Louver in Bow Mark philip
Volume (V) = 14.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. PL 18 W
Volume (V) = 12.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. TL 2x18 W Louver in Bow Mark philip


Volume (V) = 32.00 bh
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

d. E27 Down Light Ball x1 18 W in Bow


Volume (V) = 32.00 bh
Jumlah Tenaga Kerja (n) = 6 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

e. XL Philip 18 W
Volume (V) = 9.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

3 Pekerjaan instalasi Panel


a. Box panel
Volume (V) = 2.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Kabel out put


Volume (V) = 2.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Kabel input
Volume (V) = 2.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

Waktu Pekerjaan Untuk Pekerjaan Elektrical = 11


IV PEKERJAAN SANITASI LANTAI I DAN II
a. Kloset Duduk Keramik
Volume (V) = 8.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

b. Bak Mandi fibre


Volume (V) = 8.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

c. Kran air AHSP PU A.4.5.1.19


Volume = 14.00 bh
Jumlah Tenaga Kerja (n) = 2 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.125
1 1
Produktivitas = = = 8.00 m²/org/hari
N 0.125

V 14.00
Durasi Pelaksanaan (D) = = = 0.88 = 1 hari
nxP 2 x 8.00

d. Floor drain AHSP PU A.4.5.1.14


Volume = 8.00 bh
Jumlah Tenaga Kerja (n) = 1 Orang (taksir)
Indeks Tenaga Kerja (N) = 0.125
1 1
Produktivitas = = = 8.00 m²/org/hari
N 0.125

V 8.00
Durasi Pelaksanaan (D) = = = 1.00 = 1 hari
nxP 1 x 8.00

e. Wastafel
Volume (V) = 6.00 bh
Jumlah Tenaga Kerja (n) = 3 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

f. Pipa leiding (Ø 4)
Volume (V) = 18.40 M
Jumlah Tenaga Kerja (n) = 4 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

g. Pipa PVC ( Ø 4)
Volume (V) = 60.00 M
Jumlah Tenaga Kerja (n) = 8 Orang (taksir)
Waktu yang dibutuhkan = 1 hari

Waktu Pekerjaan Untuk Pekerjaan Sanitasi = 7


REKAB ANALISA TEKNIK

NO. URAIAN PEKERJAAN SATUAN VOLUME DURASI SATUAN

PEKERJAAN LANTAI 1

A. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan m² 557.27 2 Hari
2. Pemasangan Bouwplank m¹ 91.58 1 Hari
JUMLAH 3 Hari

B. PEKERJAAN TANAH
1 Galian Tanah Pondasi Tapak m³ 193.880 3 Hari
2 Galian Tanah Pondasi Menerus m³ 61.17 1 Hari
3 Urugan Kembali Galian Pondasi Tapak m³ 145.40 2 Hari
4 Urugan Kembali Galian Pondasi Menerus m³ 15.29 1 Hari
5 Pasangan Batu Kosong Pondasi Tapak m³ 11.09 1 Hari
6 Pasangan Batu Kosong Pondasi Menerus m³ 8.88 1 Hari
7 Timbunan Pasir Bawah Pondasi Tapak m³ 5.55 1 Hari
8 Timbunana Pasir Bawah Pondasi Menerus m³ 3.07 1 Hari
JUMLAH 11 Hari

C. PEKERJAAN STRUKTUR PONDASI


1 PONDASI TAPAK tipe 1 m³ 52.49 2 Hari
Pembesian Dengan Besi Polos Tulangan Pok kg 4139.92 2 Hari
Pemasangan Bekisting Pondasi + Perawatan kg 131.22 2 Hari

2 PONDASI TAPAK tipe 2 m³ 4.85 1 Hari


Pembesian Dengan Besi polos Tulangan Pokok kg 234.40 1 Hari
Pemasangan Bekisting Pondasi + Perawatan Bet kg 9.70 1 Hari
JUMLAH 9 Hari
D. PEKERJAAN BETON
1 Sloof 25/40 m3 7.22 1
Besi Tulangan Pokok Ø 16 Polos kg 797.64 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 3279.31 2 Hari
Besi Tulangan Pinggang Ø 14 Polos kg 174.48 1 Hari
Bekisting Dan Perawatan Beton m3 28.88 1 Hari

2 Sloof 20/30 m3 4.07 1


Besi Tulangan Pokok Ø 16 Polos kg 535.02 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 227.84 1 Hari
Besi Tulangan Pinggang Ø 14 Polos kg 163.85 1 Hari
Bekisting Dan Perawatan Beton m³ 20.34 1 Hari

3 Sloof gantung 25/40 m3 13.26 1


Besi Tulangan Pokok Ø 16 Polos kg 1464.92 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 6022.66 3 Hari
Besi Tulangan Pinggang Ø 14 Polos kg 320.45 1 Hari
Bekisting Dan Perawatan Beton 0.00 53.04 1 Hari

4 Kolom K1 35/35 m3 16.07 1


Besi Tulangan Pokok Ø 14 Polos kg 1268.27 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 435.97 1 Hari
Besi Tulangan Pinggang Ø 14 Polos kg 634.14 1 Hari
Bekisting Dan Perawatan Beton kg 91.84 2 Hari

5 Kolom K2 30/60 m3 23.62 2


Besi Tulangan Pokok Ø 14 Polos m2 951.21 1 Hari
Besi Tulangan Sengkang Ø 14 Polos kg 584.23 1 Hari
Besi Tulangan Pinggang Ø 14 Polos kg 1268.27 1 Hari
Bekisting Perawatan Beton m2 118.08 3 Hari

6 Kolom K4 13/13 m3 2.77 1


Besi Tulangan Pokok Ø 14 Polos kg 582.03 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 159.73 1 Hari
Bekisting Perawatan Beton m2 0.00 1 Hari

7 Pelat Lantai m3 30.83 1


Besi Tulangan Pokok Ø 12 Polos kg 4208.66 2 Hari
Bekisting Dan Perawatan Beton m² 308.30 5 Hari

8 Pelat Tangga m3 1.63 1


Besi Tulangan Pokok Ø 12 Polos kg 222.51 1 Hari
Bekisting Dan Perawatan Beton m² 16.30 1 Hari
a. Anak Tangga m3 1.42 1
Besi Tulangan Pokok Ø 12 Polos kg 193.85 1 Hari
Bekisting Dan Perawatan Beton m² 14.20 1 Hari

9 Balok Bordes 18/25 m3 0.09 1


Besi Tulangan Pokok Ø 12 kg 7.10 1 Hari
Besi Tulangan Sengkang Ø 8 Polos kg 4.31 1 Hari
Bekisting Dan Perawatan Beton m² 0.86 1 Hari

10 Pelat Bordes m² 0.60 1


Besi Tulangan Pokok Ø 12 Polos kg 81.91 1 Hari
Bekisting Dan Perawatan Beton m² 6.00 1 Hari

JUMLAH 57 Hari
E PEKERJAAN PASANGAN DAN PELASTERAN
Pasangan Dinding 1/2 Bata 1Pc : 2Ps m2 144.60 2 Hari
Pasangan Dinding 1/2 Bata 1Pc : 2Ps Selasar m² 10.43 1 Hari
Pasangan Dinding 1/2 Bata 1Pc :4Ps m2 604.28 4 Hari
Pelasteran 1Pc : 2P m² 20.86 1 Hari
Pelasteran 1Pc : 4Ps m² 577.47 4 Hari
JUMLAH 12 Hari
F PEKERJAAN TANGGA DEPAN
Galian Tanah m³ 16.98 1 Hari
Beton K-125 m3 0.73 1 Hari
Urugan pasir Tangga Depan m3 7.05 1 Hari
Pasair Alas m3 0.36 1 Hari
JUMLAH 4 Hari
G 0
Rangka Pelafond 0.00 0.00 2 Hari
Pelafond Tripleks 4 mm 0.00 0.00 1 Hari
Pelafond Selasar Tripleks 4 mm 0.00 0.00 1 Hari
List Pelafond 0.00 0.00 1 Hari
JUMLAH 5 Hari
H 0
a 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
b 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
c 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
d 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
e 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
f 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
g 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
h 0 0.00 0.00 1 Hari
i 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
j 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
k 0 0.00 0.00 1 Hari
0 0.00 0.00 1 Hari
l 0 0.00 0.00 1 Hari
JUMLAH 22 Hari
I 0
0 0 0.00 1 Hari
0 0 0.00 1 Hari
0 0 0.00 7 Hari
0 0 0.00 1 Hari
0 0 0.00 1 Hari
JUMLAH 11 Hari

NO. URAIAN PEKERJAAN SATUAN VOLUME DURASI SATUAN

#NAME?

A. #NAME?
1 0
0 m3 0.00 1 Hari
0 kg 0.00 1 Hari
0 kg 0.00 1 Hari
0 m3 0.00 1 Hari

2 0
0 m3 0.00 1 Hari
0 kg 0.000 2 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari

3 0
0 m3 1 `
0 kg 1 Hari
0 kg 1 Hari
0 kg 1 Hari
0 m3 1 Hari

4 0
0 m3 0.000 1 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari

5 0
0 m3 0.000 1 Hari
0 kg 0.000 2 Hari
0 kg 0.000 2 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari

6 0
0 m3 0.000 1 Hari
0 kg 0.000 1 Hari
0 kg 0.000 1 Hari
0 m3 0.000 1 Hari
JUMLAH 30 Hari
B 0
0 m3 0.000 3 Hari
0 m3 0.000 3 Hari
JUMLAH 6 Hari
C 0
a 0 0 0.000 1 Hari
0 0 0.000 1 Hari
b 0 0 0.000 1 Hari
0 0 0.000 1 Hari
c 0 0 0.000 1 Hari
0 0 0.000 1 Hari
d 0 0 0.000 1 Hari
0 0 0.000 1 Hari
e 0 0 0.000 1 Hari
0 0 0.000 1 Hari
f 0 0 0.000 1 Hari
0 0 0.000 1 Hari
g 0.00 0 0.000 1 Hari
0 0 0.000 1 Hari
h 0 0 0.000 1 Hari
i 0 0 0.000 1 Hari
JUMLAH 16 Hari
D 0
0 0 0.00 2 Hari
0 0 0.00 2 Hari
0 0 0.00 1 Hari
0 0 0.00 1 Hari
JUMLAH 6 Hari
E 0
0 0 0.000 1 Hari
0 0 0.000 1 Hari
0 0 0.000 7 Hari
JUMLAH 9 Hari
F 0
0 0 0.000 1 Hari
0 0 0.000 1 Hari
JUMLAH 2 Hari
G 0
0 0 0.000 3 Hari
0 0 0.000 1 Hari
0 0 0.000 1 Hari
0 0 0.000 1 Hari
JUMLAH 6 Hari
H 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
JUMLAH 6 Hari
III PEKERJAAN ELEKTRIKAL Lantai I Dan II
a 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari

b 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari

c 0
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
0 bh 0.0 1 Hari
JUMLAH 11 Hari
IV PEKERJAAN SANITASI Lantai I Dan II
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 bh 0.000 1
0 M 0.000 1
0 M 0.000 1
JUMLAH 7 Hari

NO. URAIAN PEKERJAAN SATUAN VOLUME DURASI SATUAN

1 PEKERJAAN LANTAI I 134 Hari


2 PEKERJAAN LANTAI II 99 Hari
TOTAL 233 Hari
BANYAKNYA
NO URAIAN BAHAN
BAHAN
1 Papan Kayu Kelas II 0.640
2 Kayu Kelas III 44.492
3 Pasir Urug 22.030
4 Kayu Papan 3/20 (kayu klas IV) 0.640
5 Paku 5 Cm - 10 Cm 380.624
7 Semen Portland 128473.124
8 Paku Triplek 121.715
9 Batu Gunung / Batu Kali 37.948
10 Besi Beton Polos 322051.726
11 Pasir Beton 137283.864
12 Kerikil 4726.497
13 Air 40532.230
14 Kawat Beton 4743.233
15 Minyak Bekisting 141.947
17 Balok Kayu Kelas II 14.209
18 Plywood Tebal 9 mm 321.029
19 Kayu Dolken dia. 8 - 10 Cm, L = 4 M 3067.653
20 Batu Bata 93751.700
21 Pasir Pasang 103.357
22 Tanah Timbun 18.352
25 Balok Kayu Kelas I 25.108
26 Lem Kayu 23.862
29 Semen Warna 1442.815
30 Kunci pintu standar 57.000
32 Engsel Pintu 108.000
35 Engsel Jendela 89.000
37 Hak Angin Jendela 57.000
38 Grendel Jendela 57.000
39 Multypleks 4 mm 402.766
41 List Profil 318.633
42 Box Sekering 2.000
43 Saklar tunggal 8.000
44 Saklar 3arah 3.000
45 Saklar Ganda 18.000
47 TL 2x36 W Louver in Bow Mark philip 14.000
48 . PL 18 W 12.000
49 TL 2x18 W Louver in Bow Mark philip 32.000
50 E27 Down Light Ball x1 18 W in Bow 32.000
51 XL Philip 18 W 9.000
52 Box panel 2.000
53 kabel out put 2.000
54 kabel input 2.000
55 Plamir 57.747
56 Cat Dasar Tembok 114.470
57 Cat Tembok Penutup 2x 205.23
58 Cat Manie 56.72
59 Besi Strip Tebal 5 mm 110.66
60 Paku Kayu 30.45
61 Paku 5 Cm - 10 Cm 397.57
62 Besi Beton Polos 835,989.64
64 Atap Genteng Metal 393.85
66 Rabung Genteng metal 47.28
67 Paku Seng 77.323
69 Keramik Lantai 40 x 40 cm 53,508.66
70 Gypsum 786.49
71 Paku Skrup 88.34
72 Kolset Duduk Keramik 8.00
73 Bak Mandi Fibre 88.34
74 Kran Air 14.00
75 Floor Drain 8.00
76 Wastafel 6.00
77 Pipa Leiding 18.4
78 Pipa Pvc 60.00
79 Profil Alumunium 0.46
JADWAL BAHAN
BULAN I BULAN II
SATUAN
1 2 3 4 5 6
m³ 0.640
m³ 44.492 44.492 44.492
m³ 22.030 22.030
m3 0.640
kg 380.624 380.624 380.624
kg 128473.12 128473.12 128473.12 128473.12
kg
m³ 37.948 37.948
Kg 322051.726 322051.726 322051.726 322051.726
m³ 137283.864 137283.864 137283.864 137283.864
Kg 4726.497 4726.497 4726.497 4726.497
Liter 40532.230 40532.230 40532.230 40532.230
kg 4743.233 4743.23274 4743.23274 4743.23274
Liter 141.947 141.947277 141.947277 141.947277

Lbr 321.029 321.029 321.029 321.029
Btg 3067.653 3067.653 3067.653 3067.653
Bh

m³ 18.352 18.352
m³ 25.108
kg 23.862

Bh
Bh
Bh
Bh
Bh
Lbr
M
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
kg
kg
Bh

Lebar
M
Kg
kg
Lebar
kg
Bh
Bh
Bh
Bh
Bh
Bh
Bh

HAN
BULAN II BULAN III BULAN IV
7 8 9 10 11 12 13

128473.12 128473.12 128473.12 128473.12 128473.12 128473.12 128473.12


121.715

322051.726 322051.726 322051.726 322051.726 322051.726


137283.864 137283.864 137283.864 137283.864 137283.864 137283.864 137283.864
4726.497 4726.497 4726.497 4726.497 4726.497 4726.497 4726.497
40532.230 40532.230 40532.230 40532.230 40532.230 40532.230 40532.230
4743.23274 4743.23274 4743.23274 4743.23274 4743.23274 4743.23274 4743.23274
141.947277 141.947277 141.947277 141.947277 141.947277 141.947277 141.947277
14.209
321.029 321.029 321.029 321.029 321.029
3067.653 3067.653 3067.653 3067.653 3067.653
93751.700 93751.700 93751.700 93751.700 93751.700 93751.700
103.357 103.357 103.357 103.357 103.357 103.357

25.108
23.862
BULAN IV
14 15 16

121.715

14.209
PERHITUNGAN JUMLAH MATERIAL / BAH
MATERIAL / BAHAN