Anda di halaman 1dari 56

HARGA SATUAN UPAH DAN BAHAN

PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No. JENIS BAHAN/UPAH SAT. HARGA SATUAN


1 2 3 4

I. UPAH KERJA
1 Pekerja Oh Rp 90,000.00
2 Tukang Batu/Kayu/Besi/Cat/Las Oh Rp 125,000.00
3 Kepala Tukang Oh Rp 150,000.00
4 Mandor Oh Rp 125,000.00

II. BAHAN - BAHAN


1 Batu Kali/Belah/Gunung M3 Rp 195,500.00
2 Batu Karang M3 Rp 150,000.00
3 Koral/Kerikil M3 Rp 250,000.00
4 Split/Batu Pecah M3 Rp 320,000.00
5 Pasir Pasang M3 Rp 145,000.00
6 Sirtu M3 Rp 145,000.00
7 Pasir Urug M3 Rp 145,000.00
8 Pasir Beton M3 Rp 145,000.00
9 Pasir Plester M 3
Rp 145,000.00
10 Tanah Urug M3 Rp 110,250.00
11 Tanah Humus M3 Rp 95,000.00
12 ###Batu Bata Besar Bh Rp 1,102.00
13 ###Kapur Mil Kg Rp 1,000.00
14 ###Portland Cement Kg Rp 1,710.00
15 ###Semen Warna Kg Rp 15,750.00
16 Bahan Ekspos Kg Rp 6,000.00
17 ###Atap Genteng Metal Tebal Lbr Rp 60,300.00
18 Atap Genteng Metal Tipis Lbr Rp 45,450.00
19 ###Bubungan Atap Genteng Metal Lbr Rp 20,000.00
20 ###Atap Seng Gelombang BJLS (0,20) Lbr Rp 60,750.00
21 ###Kayu Klas II (Kamper) M3 Rp 2,666,250.00
22 Kayu Klas II (Palapi) M3 Rp 3,870,000.00
23 Kayu Klas III ( Campuran ) M3 Rp 2,340,000.00
No. JENIS BAHAN/UPAH SAT. HARGA SATUAN
1 2 3 4
24 Papan Kelas II M3 Rp 2,666,250.00
25 Kayu Bakau/Terocok M3 Rp 1,586,250.00
26 Dolken/Tiang Perancah ( 4 M' ) M3 Rp 1,714,500.00
27 Dolken/Tiang Perancah ( 4 M' ) Btg Rp 24,718.00
28 Kayu Balok Btg Rp 20,000.00
29 Playwood Tebal 4 mm Lbr Rp 65,000.00
30 Playwood Tebal 9 mm Lbr Rp 150,000.00
31 Multipleks Tebal 9 mm Lbr Rp 200,000.00
32 Multipleks Tebal 12 mm Lbr Rp 385,000.00
33 Tripleks 3 mm Lbr Rp 52,500.00
34 HPL Lbr Rp 500,000.00
35 Besi Beton Kg Rp 13,000.00
36 Kawat Beton Kg Rp 17,550.00
37 Kawat Ram M2 Rp 15,000.00
38 Kawat Las Kg Rp 50,000.00
39 Kawat Penggantung Rangka Plafond Kg Rp 40,000.00
40 Rangka Partisi Baja Ringan Btg Rp 90,000.00
41 Hollow Galvanis 4 x 2 cm Rangka Plafond M' Rp 15,000.00
42 Besi Hollow 4 x 2 cm Btg Rp 100,000.00
43 Besi Hollow 4 x 4 cm Btg Rp 125,000.00
44 Besi Hollow 5 x 5 cm Btg Rp 150,000.00
45 Besi Siku 40.40.4 Btg Rp 150,000.00
46 Aluminium Composite Panel Ex. Seven Lbr Rp 650,000.00
47 Pipa Galvanis Ǿ 3/4" Panjang 6 m M' Rp 35,000.00
48 Pipa Galvanis Ǿ 2" Panjang 6 m M' Rp 85,000.00
49 Pipa Galvanis Ǿ 2,5" Panjang 6 m Coating M' Rp 150,000.00
50 Pipa Galvanis Ǿ 3" Panjang 6 m Coating M' Rp 200,000.00
51 Pipa Stainless Ǿ 2,5" Panjang 6 m M' Rp 200,000.00
52 Pipa Stainless Ǿ 2,5" Panjang 6 m M' Rp 350,000.00
53 Pipa PVC 1/2" Panjang 4 m M' Rp 7,500.00
54 Pipa PVC 3/4" Panjang 4 m M' Rp 12,500.00
55 Pipa PVC 1" Panjang 4 m M' Rp 17,500.00
56 Pipa PVC 2" Panjang 4 m M' Rp 22,500.00
57 Pipa PVC 3" Panjang 4 m M' Rp 30,000.00
58 Pipa PVC 4" Panjang 4 m M' Rp 40,000.00
59 Kran Westafel Ex. Toto Bh Rp 350,000.00
60 Kran Air Stainless Steel 1/2" Bh Rp 190,000.00
61 Seal tape Bh Rp 7,000.00
62 Closed Jongkok Ex. TOTO CE6 Bh Rp 435,000.00
63 Closed Duduk monoblok Ex. TOTO Set Rp 3,500,000.00
64 Westafel Ex. Toto Set Rp 1,500,000.00
No. JENIS BAHAN/UPAH SAT. HARGA SATUAN
1 2 3 4
65 Bak Cuci Stainless Steel jumbo Set Rp 2,000,000.00
66 Tangki Air Stainless Steel kap. 1100 Liter Bh Rp 5,000,000.00
67 Jet Shower Ex. TOTO Bh Rp 300,000.00
68 Floor Drain Stainless Steel Bh Rp 75,000.00
69 Stop Kran 1" Bh Rp 85,000.00
70 Pipa Penghawaan Bh Rp 30,000.00
71 Ijuk Kg Rp 14,450.00
72 Dap Air 200 Watt Ex. Panasonic Bh Rp 1,000,000.00
73 Gypsum Board 9 mm Lbr Rp 85,000.00
74 Tepung Gypsum Kg Rp 5,000.00
75 Plester Gips Roll Rp 20,000.00
76 List Profil Gypsum M' Rp 20,000.00
77 List Profil Kayu M' Rp 10,000.00
78 Rangka Kusen Aluminium 4" M' Rp 116,500.00
79 Profil Aluminium Curtain Wall M' Rp 200,000.00
80 Profil Aluminium Jendela Cliding M' Rp 90,000.00
81 Rangka Daun Jendela Aluminium M' Rp 90,000.00
82 Aluminium Strip lebar 8 cm M' Rp 50,000.00
83 Pintu Aluminium KM/WC Bh Rp 1,000,000.00
84 Skrup Fixer Bh Rp 1,000.00
85 Kaca Raybend 5 mm M2 Rp 250,000.00
86 Kaca Bening 5 mm M2 Rp 200,000.00
87 Kaca Stopsol 5 mm M2 Rp 450,000.00
88 Kaca Tempered 10 mm M2 Rp 1,250,000.00
89 Kaca Tempered 12 mm M2 Rp 1,750,000.00
90 Karet Kaca M' Rp 2,500.00
91 Stiker Kaca M2 Rp 200,000.00
92 Sekrup / Sekrup Gypsum Kg Rp 20,000.00
93 Besi Beugel/Baut, Kawat Jepit Kg Rp 18,000.00
94 Paku Biasa 1/2" - 1" Kg Rp 18,000.00
95 Paku Genteng Metal Lbr Rp 20,000.00
96 Paku Biasa 2" - 5" Kg Rp 17,500.00
97 Engsel Tanam Pintu Double Ex. Dekson Bh Rp 1,000,000.00
98 Engsel Pintu 4" Ex. Dekson Bh Rp 50,000.00
99 Engsel Jendela 3" Ex. Dekson Bh Rp 30,000.00
100 Kunci Tanam Ex. Dekson Bh Rp 350,000.00
101 Fitting Bh Rp 250,000.00
102 Handle Pintu Utama(Stainlees Stell) Bh Rp 850,000.00
103 Handle Pintu (Stainlees Stell) Besar Psg Rp 500,000.00
104 Handle Pintu (Stainlees Stell) Sedang Psg Rp 350,000.00
105 Handle Pintu Aluminium KM/WC Psg Rp 200,000.00
106 Kunci Tanam 2 Slaag Bh Rp 300,000.00
No. JENIS BAHAN/UPAH SAT. HARGA SATUAN
1 2 3 4
107 Kunci Pintu Biasa Bh Rp 100,000.00
108 Grendel Pintu Bh Rp 30,000.00
109 Grendel Jendela Bh Rp 20,000.00
110 Handle Jendela Bh Rp 20,000.00
111 Kait Angin Psg Rp 25,000.00
112 Meni Kayu Kg Rp 20,000.00
113 Plamir Kayu / Dempul Kg Rp 20,000.00
114 Cat Kayu Kg Rp 46,500.00
115 Plamir Tembok Kg Rp 20,000.00
116 Cat Tembok Kg Rp 60,000.00
117 Meni Besi Kg Rp 25,000.00
118 Cat Besi Kg Rp 50,000.00
119 Cat Kedap Air Kg Rp 70,000.00
120 Minyak Cat/Thinner Ltr Rp 25,000.00
121 Minyak Bekesting Ltr Rp 7,500.00
122 Thinner A Ltr Rp 35,000.00
123 Solar Ltr Rp 7,500.00
124 Minyak Pelumas Ltr Rp 25,000.00
125 Kuas 3" Bh Rp 7,000.00
126 Lem Kayu Kg Rp 20,000.00
127 Sealent Tube Rp 50,000.00
128 Keramik 40 cm x 40 cm Ex. Granite M2 Rp 254,475.00
129 Keramik 40 cm x 40 cm Ex. Roman Dos Rp 90,900.00
130 Keramik 20 cm x 25 cm Ex. Roman Dos Rp 95,000.00
131 Keramik 25 cm x 50 cm Ex. Roman Dos Rp 110,000.00
132 Keramik 20 cm x 20 cm Ex. Roman Dos Rp 95,000.00
133 Stepnosing Tangga Granit 30x60 Bh Rp 85,000.00
134 Plint Ubin Granit 10 cm x 60 cm Bh Rp 10,000.00
135 List Border 8 cm x 25 cm Bh Rp 25,000.00
136 Air Kerja liter Rp 50.00
137 Down light Bh Rp 175,000.00
138 Lampu Philips SL 5 Watt Bh Rp 50,000.00
139 Lampu Philips SL 18 Watt Bh Rp 75,000.00
140 Lampu TL 20 Watt Set Rp 250,000.00
No. JENIS BAHAN/UPAH SAT. HARGA SATUAN
1 2 3 4
141 Lampu Taman Set Rp 800,000.00
142 Down light (Philips Spiral 8 Watt) Bh Rp 120,000.00
143 Lampu Spot Light 20 Watt Bh Rp 400,000.00
144 Saklar Tunggal Bh Rp 50,000.00
145 Saklar Ganda Bh Rp 55,000.00
146 Stop Kontak Bh Rp 50,000.00
147 Stop Kontak AC Bh Rp 125,000.00
148 Exhause Fan Bh Rp 550,000.00
149 Dos Saklar dan Stop Kontak Bh Rp 5,000.00
150 Kabel Tanam M' Rp 35,000.00
151 Instalasi Titik Lampu & Stop Kontak Ttk Rp 400,000.00
152 Sensor Cahaya 250 Watt Bh Rp 250,000.00
153 Tabung Pemadam Api 9 Kg Bh Rp 3,500,000.00
154 Dynabolt M8 Pcs Rp 2,000.00
155 C-75, 0.8 M' Rp 13,000.00
156 C-65, 0.6 M' Rp 12,000.00
157 Reng M' Rp 7,500.00
158 Baut (Screw Driver) Bh Rp 500.00
159 Dynabolt Bh Rp 4,000.00
160 Lisplank GRC Lebar 40 cm Lbr Rp 90,000.00
161 Paving Block K200 Bh Rp 2,500.00
162 Batu Alam "RTA Andesit Polos" 5 x 30 cm M2 Rp 97,000.00
163 Talang Jurai Dalam P = 3 m M' Rp 85,000.00
164 Kertas Pasir / Amplas Lbr Rp 5,000.00
165 Door Closer Bh Rp 850,000.00
166 MCB 10A Bh Rp 65,000.00
167 Fitting Lampu Bh Rp 20,000.00
168 Pipa Listrik M' Rp 3,750.00
169 Kabel Instalasi 1.5mm (Eterna) M' Rp 1,450.00
170 Box Saklar Ganda (Panasonic) Bh Rp 50,000.00
171 Box Saklar Seri Kontak (Panasonic) Bh Rp 45,000.00
172 Panel MCB Komplit 4 Canel Unit Rp 300,000.00
170 Tandom Air/Reservoir 1550Ltr Bh Rp 1,870,000.00

III. PERALATAN
1 Alat Bantu Jam Rp 50,000.00
2 Aspalt Mixing Plant
3 Aspalt Finisher
4 Tandem Roller
5 Tyre Roller
No. JENIS BAHAN/UPAH SAT. HARGA SATUAN
1 2 3 4
6 Wheel Loader

Palu, 20 November 2017


Dibuat Oleh,

H. SAMSUL RIZAL, S.E


HAN

KETERANGAN
5

85,500.00
KETERANGAN
5
KETERANGAN
5

Rp 250,000.00
KETERANGAN
5

42,413
15,150
4,750
13,750
3,800
KETERANGAN
5

1,456
28,333
KETERANGAN
5

0 November 2017
Dibuat Oleh,

MSUL RIZAL, S.E


DAFTAR PERHITUNGAN KONVERSI BESI

Luas
Berat
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan Besi / M

h b L P M² Ø (Kg) Jarak M¹ Jumlah Batang M¹

1 Poor Plat 120/120 1.20 0.35 0.42 2.38 3.333333333 14.00 1.208 0.15 6.67 20.667 49.206
( Poor Plat 1 ) 1.20 0.35 0.42 2.38 14.00 1.208 0.15 6.67 20.667 49.206

2 Sloof 15/20 0.20 0.15 0.03 33.33 13.33 12.00 0.888 2.000 66.67
0.20 0.15 0.03 33.33 12.00 0.888 2.000 66.67
0.20 0.15 0.03 33.33 6.00 0.222 0.15 6.67 4.667 155.56
-

3 Sloof 25/40 0.40 0.25 0.10 10.00 8.00 12.00 0.888 3.000 30.00
0.40 0.25 0.10 10.00 12.00 0.888 5.000 50.00
0.40 0.25 0.10 10.00 6.00 0.222 0.15 6.67 8.667 86.67
-

4 Sloof 15/40 0.40 0.15 0.06 16.67 13.33 12.00 0.888 3.000 50.00
0.40 0.15 0.06 16.67 12.00 0.888 3.000 50.00
0.40 0.15 0.06 16.67 8.00 0.395 0.15 6.67 7.333 122.22
-

5 Kolom 20/20 0.20 0.20 0.04 25.00 20.00 12.00 0.888 2.000 50.00
0.20 0.20 0.04 25.00 12.00 0.888 2.000 50.00
Luas
Berat
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan Besi / M

h b L P M² Ø (Kg) Jarak M¹ Jumlah Batang M¹
0.20 0.20 0.04 25.00 6.00 0.222 0.15 6.67 5.333 133.33

6 Kolom 30/30 0.30 0.30 0.09 11.11 13.33 12.00 0.888 4.000 44.44
0.30 0.30 0.09 11.11 12.00 0.888 4.000 44.44
0.30 0.30 0.09 11.11 6.00 0.222 0.15 6.67 8.000 88.89
Luas
Berat
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan Besi / M

h b L P M² Ø (Kg) Jarak M¹ Jumlah Batang M¹

7 Kolom 15/15 0.15 0.15 0.02 44.44 26.67 12.00 0.888 2.000 88.89
0.15 0.15 0.02 44.44 12.00 0.888 2.000 88.89
0.15 0.15 0.02 44.44 6.00 0.222 0.15 6.67 4.000 177.78

8 Balok Induk 25/40 0.40 0.25 0.10 10.00 10.50 12.00 0.888 4.000 40.00
0.40 0.25 0.10 10.00 12.00 0.888 4.000 40.00
0.40 0.25 0.10 10.00 6.00 0.222 0.15 6.67 8.667 86.67

9 Balok Latei 15/30 0.30 0.15 0.05 22.22 16.67 12.00 0.888 3.000 66.67
0.30 0.15 0.05 22.22 12.00 0.888 3.000 66.67
0.30 0.15 0.05 22.22 6.00 0.222 0.15 6.67 6.000 133.33
Luas
Berat
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan Besi / M

h b L P M² Ø (Kg) Jarak M¹ Jumlah Batang M¹

10 RingBalk 15/20 0.20 0.15 0.03 33.33 13.33 12.00 0.888 2.000 66.67
0.20 0.15 0.03 33.33 12.00 0.888 2.000 66.67
0.20 0.15 0.03 33.33 6.00 0.222 0.20 5.00 3.500 116.67

11 Lantai 0.12 1.00 0.12 8.33 8.33 10.00 0.617 0.15 13.33 14.333 119.44
T = 12 cm
0.12 1.00 0.12 8.33 10.00 0.617 0.15 13.33 14.333 119.44

12 Lantai 0.08 1.00 0.08 12.50 12.50 10.00 0.617 0.15 13.33 14.333 179.17
T = 8 cm
0.08 1.00 0.08 12.50 10.00 0.617 0.15 13.33 14.333 179.17
Luas
Berat
Dimensi Beton / M¹ Bekisting / Jenis Besi Besi Begel / M¹ Jumlah Besi Panjang Besi
No. Uraian Pekerjaan Besi / M

h b L P M² Ø (Kg) Jarak M¹ Jumlah Batang M¹

Plat Tangga 0.12 1.00 0.12 8.33 8.33 12.00 0.888 0.15 13.33 14.333 119.44
T = 12 cm
0.12 1.00 0.12 8.33 12.00 0.888 0.15 13.33 14.333 119.44

ANAK TANGGA 0.20 0.20 0.04 25.00 10.00 12.00 0.888 2.000 50.00
0.20 0.20 0.04 25.00 12.00 0.888 1.000 25.00
0.20 0.20 0.04 25.00 12.00 0.888 0.15 6.67 5.333 133.33
-
Berat Besi /

Kg

59.458
59.458
118.916

59.184
59.184
34.524
152.892

26.633
44.388
19.235
90.256

44.388
44.388
48.224
137.000

44.388
44.388
Berat Besi /

Kg
29.592
118.368

39.456
39.456
19.728
98.640
Berat Besi /

Kg

78.912
78.912
39.456
197.280

35.510
35.510
19.235
90.256

59.184
59.184
29.592
147.960
Berat Besi /

Kg

59.184
59.184
25.893
144.261

73.638

73.638
147.275

110.456

110.456
220.913
Berat Besi /

Kg

106.038

106.038
212.076

44.388
22.194
118.368
184.950
DAFTAR ANALISA HARGA SATUAN

PEKERJAAN :
LOKASI :
TAHUN :

1 PEKERJAAN 1 M1 PEMBUATAN PAGAR SENG GELOMBANG SEMENTARA


Bahan Harga Satuan
0.019 M3 Kayu 5/7 & Papan 3/20 Rp. 2,340,000 Rp. 44,460
0.02 Kg Paku Biasa Rp. 18,000 Rp. 360
1.00 Lbr Seng gelombang Rp. 60,750 Rp. 60,750
Tenaga
0.1 Oh Pekerja Rp. 90,000 Rp. 9,000
0.1 Oh Tukang Rp. 125,000 Rp. 12,500
Jumlah Rp. 127,070

2 PEKERJAAN 1 M1 PASANGAN DAN PENGUKURAN BOUPLANK


Bahan Harga Satuan
0.019 M3 Kayu 5/7 & Papan 3/20 Rp. 52,500 Rp. 998
0.02 Kg Paku Biasa Rp. 350,000 Rp. 7,000
Tenaga
0.1 Oh Pekerja Rp. 145,000 Rp. 14,500
0.1 Oh Tukang Rp. 145,000 Rp. 14,500
0.001 Oh Kepala Tukang Rp. 145,000 = Rp. 145
0.005 Oh Mandor Rp. 145,000 = Rp. 725
Jumlah Rp. 37,868

3 PEKERJAAN 1 M3 GALIAN TANAH BIASA SEDALAM 1 METER


Tenaga Harga Satuan
0.75 Oh Pekerja Rp. 90,000 = Rp. 67,500
0.025 Oh Mandor Rp. 125,000 = Rp. 3,125
Jumlah Rp. 70,625

4 PEKERJAAN 1 M3 GALIAN TANAH BIASA SEDALAM 2 METER


Tenaga Harga Satuan
0.9 Oh Pekerja Rp. 90,000 = Rp. 81,000
0.045 Oh Mandor Rp. 125,000 = Rp. 5,625
Jumlah Rp. 86,625
5 PEKERJAAN 1 M3 URUGAN KEMBALI
Tenaga Harga Satuan
0.192 Oh Pekerja Rp. 90,000 = Rp. 17,280
0.019 Oh Mandor Rp. 125,000 = Rp. 2,375
Jumlah Rp. 19,655
6 PEKERJAAN 1 M3 URUGAN PASIR
Bahan Harga Satuan
1.2 M3 Pasir Urug / Timbunan Palupi Rp. 145,000 = Rp. 174,000
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.01 Oh Mandor Rp. 125,000 = Rp. 1,250
Jumlah Rp. 202,250

7 PEKERJAAN 1 M3 URUGAN SIRTU PADAT


Bahan Harga Satuan
1.2 M3 Sirtu Rp. 145,000 = Rp. 174,000
Tenaga
0.25 Oh Pekerja Rp. 90,000 = Rp. 22,500
0.025 Oh Mandor Rp. 125,000 = Rp. 3,125
Jumlah Rp. 199,625

8 PEKERJAAN 1 M3 PEMADATAN URUGAN


Tenaga Harga Satuan
0.5 Oh Pekerja Rp. 90,000 = Rp. 45,000
0.05 Oh Mandor Rp. 125,000 = Rp. 6,250
Jumlah Rp. 51,250

9 PEKERJAAN 1 M3 PASANGAN BATU KOSONG


Bahan Harga Satuan
1.2 M3 Batu Kali Rp. 195,500 = Rp. 234,600
0.432 M3 Pasir Urug Rp. 145,000 = Rp. 62,640
Tenaga
0.78 Oh Pekerja Rp. 90,000 = Rp. 70,200
0.39 Oh Tukang Rp. 125,000 = Rp. 48,750
0.039 Oh Kepala Tukang Rp. 150,000 = Rp. 5,850
0.039 Oh Mandor Rp. 125,000 = Rp. 4,875
Jumlah Rp. 426,915
10 PEKERJAAN 1 M3 PASANGAN PONDASI BATU KALI 1 PC : 5 PSR
Bahan Harga Satuan
1.1 M3 Batu Kali Rp. 195,500 = Rp. 215,050
136 Kg Semen Portland Rp. 1,710 = Rp. 232,560
0.544 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 78,880
Tenaga
1.5 Oh Pekerja Rp. 90,000 = Rp. 135,000
0.75 Oh Tukang Rp. 125,000 = Rp. 93,750
0.075 Oh Kepala Tukang Rp. 150,000 = Rp. 11,250
0.075 Oh Mandor Rp. 125,000 = Rp. 9,375
Jumlah Rp. 775,865

11 PEKERJAAN 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 2 PSR


Bahan Harga Satuan
70 Buah Batu Bata Ukuran 5 x 11 x 22 Rp. 1,102 = Rp. 77,140
14.37 Kg Semen Portland Rp. 1,710 = Rp. 24,573
0.04 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 5,800
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.015 Oh Mandor Rp. 125,000 = Rp. 1,875
Jumlah Rp. 150,388

12 PEKERJAAN 1 M2 PASANGAN BATU BATA TEBAL 1/2 BATA 1 PC : 5 PSR


Bahan Harga Satuan
70 Bh Batu Bata Ukuran 5 x 11 x 22 Rp. 1,102 = Rp. 77,140
9.68 Kg Semen Portland Rp. 1,710 = Rp. 16,553
0.045 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 6,525
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.015 Oh Mandor Rp. 125,000 = Rp. 1,875
Jumlah Rp. 143,093
13 PEKERJAAN 1 M2 PEKERJAAN PLESTERAN 1 PC : 2 PSR TEBAL 15 MM
Bahan Harga Satuan
10.224 Kg Semen Portland Rp. 1,710 = Rp. 17,483
0.02 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 2,900
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.015 Oh Mandor Rp. 125,000 = Rp. 1,875
Jumlah Rp. 70,258

14 PEKERJAAN 1 M2 PEKERJAAN PLESTERAN 1 PC : 3 PSR TEBAL 15 MM


Bahan Harga Satuan
7.776 Kg Semen Portland Rp. 1,710 = Rp. 13,297
0.023 M3 Pasir Pasang Rp. 145,000 = Rp. 3,335
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.015 Oh Mandor Rp. 125,000 = Rp. 1,875
Jumlah Rp. 66,507

15 PEKERJAAN 1 M2 PEKERJAAN PLESTERAN 1 PC : 5 PSR TEBAL 15 MM


Bahan Harga Satuan
5.184 Kg Semen Portland Rp. 1,710 = Rp. 8,865
0.026 M3 Pasir Pasang Rp. 145,000 = Rp. 3,770
Tenaga
0.3 Oh Pekerja Rp. 90,000 = Rp. 27,000
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.015 Oh Mandor Rp. 125,000 = Rp. 1,875
Jumlah Rp. 62,510
16 PEKERJAAN 1 M2 PEKERJAAN ACIAN AIR SEMEN
Bahan Harga Satuan
4 Kg Semen Portland Rp. 1,710 = Rp. 6,840
Tenaga
0.028 Oh Pekerja Rp. 90,000 = Rp. 2,520
0.042 Oh Tukang Rp. 125,000 = Rp. 5,250
0.004 Oh Kepala Tukang Rp. 150,000 = Rp. 600
0.003 Oh Mandor Rp. 125,000 = Rp. 375
Jumlah Rp. 15,585

17 PEKERJAAN 1 M3 MEMBUAT BETON TUMBUK 1 PC : 3 PSR : 5 KRK


Bahan Harga Satuan
218 Kg Semen Portland Rp. 1,710 = Rp. 372,780
0.52 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 75,400
0.87 M3 Kerikil Sungai Ayakan Rp. 250,000 = Rp. 217,500
Tenaga
1.65 Oh Pekerja Rp. 90,000 = Rp. 148,500
0.25 Oh Tukang Rp. 125,000 = Rp. 31,250
0.025 Oh Kepala Tukang Rp. 150,000 = Rp. 3,750
0.08 Oh Mandor Rp. 125,000 = Rp. 10,000
Jumlah Rp. 859,180

18 PEKERJAAN 1 M3 MEMBUAT BETON BERTULANG 1 PC : 2 PSR : 3 KRK


Bahan Harga Satuan
336 Kg Semen Portland Rp. 1,710 = Rp. 574,560
0.54 M3 Pasir Beton Rp. 145,000 = Rp. 78,300
0.81 M3 Kerikil Sungai Ayakan Rp. 250,000 = Rp. 202,500
Tenaga
1.65 Oh Pekerja Rp. 90,000 = Rp. 148,500
0.25 Oh Tukang Rp. 125,000 = Rp. 31,250
0.025 Oh Kepala Tukang Rp. 150,000 = Rp. 3,750
0.08 Oh Mandor Rp. 125,000 = Rp. 10,000
Jumlah Rp. 1,048,860
19 PEKERJAAN 1 KG PEMBESIAN DENGAN BESI POLOS / ULIR
Bahan Harga Satuan
1.05 Kg Besi Beton Polos Rp. 13,000 = Rp. 13,650
0.015 Kg Kawat Ikat Beton / Bendrat Rp. 17,550 = Rp. 263
Tenaga
0.007 Oh Pekerja Rp. 90,000 = Rp. 630
0.007 Oh Tukang Rp. 125,000 = Rp. 875
0.0007 Oh Kepala Tukang Rp. 150,000 = Rp. 105
0.0003 Oh Mandor Rp. 125,000 = Rp. 38
Jumlah Rp. 15,561

20 PEKERJAAN 1 M2 PASANG BEKISTING UNTUK PONDASI


Bahan Harga Satuan
0.04 M3 Kayu Terentang / Mall Rp. 1,586,250 = Rp. 63,450
0.3 Kg Paku 1" - 2" Rp. 18,000 = Rp. 5,400
0.1 Liter Minyak Bekisting Rp. 7,500 = Rp. 750
Tenaga
0.15 Oh Pekerja Rp. 90,000 = Rp. 13,500
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.016 Oh Kepala Tukang Rp. 150,000 = Rp. 2,400
0.005 Oh Mandor Rp. 125,000 = Rp. 625
Jumlah Rp. 98,625

21 PEKERJAAN 1 M2 PASANG BEKISTING UNTUK SLOOF


Bahan Harga Satuan
0.045 M3 Kayu Terentang / Mall Rp. 1,586,250 = Rp. 71,381
0.3 Kg Paku 1" - 2" Rp. 18,000 = Rp. 5,400
0.1 Liter Minyak Bekisting Rp. 7,500 = Rp. 750
Tenaga
0.15 Oh Pekerja Rp. 90,000 = Rp. 13,500
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.016 Oh Kepala Tukang Rp. 150,000 = Rp. 2,400
0.005 Oh Mandor Rp. 125,000 = Rp. 625
Jumlah Rp. 106,556
22 PEKERJAAN 1 M2 PASANG BEKISTING UNTUK KOLOM
Bahan Harga Satuan
0.04 M3 Kayu Terentang / Mall Rp. 1,586,250 = Rp. 63,450
0.4 Kg Paku 1" - 2" Rp. 18,000 = Rp. 7,200
0.2 Liter Minyak Bekisting Rp. 7,500 = Rp. 1,500
0.01 M3 Balok Kayu Rp. 20,000 = Rp. 200
1 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 24,718 = Rp. 24,718
Tenaga
0.15 Oh Pekerja Rp. 90,000 = Rp. 13,500
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.011 Oh Kepala Tukang Rp. 150,000 = Rp. 1,650
0.006 Oh Mandor Rp. 125,000 = Rp. 750
Jumlah Rp. 125,468

23 PEKERJAAN 1 M2 PASANG BEKISTING UNTUK BALOK


Bahan Harga Satuan
0.04 M3 Kayu Terentang / Mall Rp. 1,586,250 = Rp. 63,450
0.4 Kg Paku 1" - 2" Rp. 18,000 = Rp. 7,200
0.2 Liter Minyak Bekisting Rp. 7,500 = Rp. 1,500
0.01 M3 Balok Kayu Rp. 20,000 = Rp. 200
2 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 24,718 = Rp. 49,436
Tenaga
0.12 Oh Pekerja Rp. 90,000 = Rp. 10,800
0.13 Oh Tukang Rp. 125,000 = Rp. 16,250
0.022 Oh Kepala Tukang Rp. 150,000 = Rp. 3,300
0.006 Oh Mandor Rp. 125,000 = Rp. 750
Jumlah Rp. 152,886
24 PEKERJAAN 1 M2 PASANG BEKISTING UNTUK LANTAI
Bahan Harga Satuan
0.04 M3 Kayu Terentang / Mall Rp. 1,586,250 = Rp. 63,450
0.4 Kg Paku 1" - 2" Rp. 18,000 = Rp. 7,200
0.2 Liter Minyak Bekisting Rp. 7,500 = Rp. 1,500
0.018 M3 Balok Kayu Rp. 20,000 = Rp. 360
0.35 Lbr Playwood Tebal 9 mm Rp. 150,000 = Rp. 52,500
6 Btg Dolken Kayu Galam Ø 8 - 10 P = 4 m Rp. 24,718 = Rp. 148,308
Tenaga
0.12 Oh Pekerja Rp. 145,000 = Rp. 17,400
0.13 Oh Tukang Rp. 145,000 = Rp. 18,850
0.022 Oh Kepala Tukang Rp. 110,250 = Rp. 2,426
0.006 Oh Mandor Rp. 95,000 = Rp. 570
Jumlah Rp. 312,564

25 1 M3 PEKERJAAN PONDASI BETON TAPAK 120 x 120cm


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
118.916 Kg Besi Beton Rp. 15,561 = Rp. 1,850,422
3.333 M2 Bekisting Pondasi Rp. 98,625 = Rp. 328,750
Jumlah Rp. 3,228,032

26 1 M3 PEKERJAAN SLOOF BETON 15 X 20


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
152.89 Kg Besi Beton Rp. 15,561 = Rp. 2,379,114
13.33 M2 Bekisting Sloof Rp. 106,556 = Rp. 1,420,750
Jumlah Rp. 4,848,724

27 1 M3 PEKERJAAN SLOOF BETON 25 X 40


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
90.26 Kg Besi Beton Rp. 15,561 = Rp. 1,404,445
8.00 M2 Bekisting Sloof Rp. 106,556 = Rp. 852,450
Jumlah Rp. 3,305,755
28 1 M3 PEKERJAAN SLOOF BETON 15 X 40
1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
137.00 Kg Besi Beton Rp. 15,561 = Rp. 2,131,823
13.33 M2 Bekisting Sloof Rp. 106,556 = Rp. 1,420,750
Jumlah Rp. 4,601,433

28 1 M3 PEKERJAAN KOLOM 20 x 20 (Pagar)


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
118.37 Kg Besi Beton Rp. 15,561 = Rp. 1,841,895
20.00 M2 Bekisting Kolom Rp. 125,468 = Rp. 2,509,360
Jumlah Rp. 5,400,115

29 1 M3 PEKERJAAN KOLOM 30 x 30
1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
98.64 Kg Besi Beton Rp. 15,561 = Rp. 1,534,912
13.33 M2 Bekisting Kolom Rp. 125,468 = Rp. 1,672,907
Jumlah Rp. 4,256,679

30 1 M3 PEKERJAAN KOLOM 15 x 15
1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
149.06 Kg Besi Beton Rp. 15,561 = Rp. 2,319,423
26.67 M2 Bekisting Kolom Rp. 125,468 = Rp. 3,345,813
Jumlah Rp. 6,714,096

31 1 M3 PEKERJAAN BALOK LANTAI BETON (BI) 25 X 40


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
90.256 Kg Besi Beton Rp. 15,561 = Rp. 1,404,445
10.50 M2 Bekisting Ring Balk Rp. 152,886 = Rp. 1,605,303
Jumlah Rp. 4,058,608

32 1 M3 PEKERJAAN BALOK LATEI BETON (BT) 15 X 30


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
147.96 Kg Besi Beton Rp. 15,561 = Rp. 2,302,369
16.67 M2 Bekisting Ring Balk Rp. 152,886 = Rp. 2,548,100
Jumlah Rp. 5,899,329
33 1 M3 PEKERJAAN RING BALOK BETON 15 X 30
1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
144.261 Kg Besi Beton Rp. 15,561 = Rp. 2,244,809
13.33 M2 Bekisting Ring Balk Rp. 152,886 = Rp. 2,038,480
Jumlah Rp. 5,332,149

34 1 M3 PEKERJAAN RING BALOK BETON 15 X 20


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
144.261 Kg Besi Beton Rp. 15,561 = Rp. 2,244,809
13.33 M2 Bekisting Ring Balk Rp. 152,886 = Rp. 2,038,480
Jumlah Rp. 5,332,149

34 1 M3 PEKERJAAN BETON PLAT LANTAI T = 12 CM


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
147.275 Kg Besi Beton Rp. 15,561 = Rp. 2,291,709
8.33 M2 Bekisting Lantai Rp. 312,564 = Rp. 2,604,696
Jumlah Rp. 5,945,265

35 1 M3 PEKERJAAN PLAT BETON PENUTUP / TALANG T = 8 Cm


1.000 M3 Beton 1 : 2 : 3 Rp. 1,048,860 = Rp. 1,048,860
220.913 Kg Besi Beton Rp. 15,561 = Rp. 3,437,564
12.50 M2 Bekisting Rp. 312,564 = Rp. 3,907,044
Jumlah Rp. 8,393,468

36 PEKERJAAN 1 M2 PASANG LANTAI KERAMIK WARNA 40 X 40 CM


Bahan Harga Satuan
6 Bh Tegel Keramik 40 x 40 cm "Granito Tile" Rp. 42,413 = Rp. 254,475
9.8 Kg Semen Portland Rp. 1,710 = Rp. 16,758
0.045 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 6,525
1.5 Kg Nat / Mortar Flex Rp. 15,750 = Rp. 23,625
Tenaga
0.25 Oh Pekerja Rp. 90,000 = Rp. 22,500
0.125 Oh Tukang Rp. 125,000 = Rp. 15,625
0.013 Oh Kepala Tukang Rp. 150,000 = Rp. 1,950
0.013 Oh Mandor Rp. 125,000 = Rp. 1,625
Jumlah Rp. 343,083
37 PEKERJAAN 1 M2 PASANG LANTAI KERAMIK 20 X 20 CM KM/WC
Bahan Harga Satuan
25 Bh Tegel Keramik 20 x 20 cm Rp. 3,800 = Rp. 95,000
10.4 Kg Semen Portland Rp. 1,710 = Rp. 17,784
0.045 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 6,525
1.62 Kg Nat / Mortar Flex Rp. 15,750 = Rp. 25,515
Tenaga
0.7 Oh Pekerja Rp. 90,000 = Rp. 63,000
0.35 Oh Tukang Rp. 125,000 = Rp. 43,750
0.035 Oh Kepala Tukang Rp. 150,000 = Rp. 5,250
0.035 Oh Mandor Rp. 125,000 = Rp. 4,375
Jumlah Rp. 261,199
38 PEKERJAAN 1 M2 PASANG DINDING KERAMIK 20 X 25 CM
Bahan Harga Satuan
20 Bh Tegel Keramik Dinding 20 x 25 cm Rp. 4,750 = Rp. 95,000
10.4 Kg Semen Portland Rp. 1,710 = Rp. 17,784
0.045 M3 Pasir Pasang / Beton Rp. 145,000 = Rp. 6,525
1.62 Kg Nat / Mortar Flex Rp. 15,750 = Rp. 25,515
Tenaga
0.7 Oh Pekerja Rp. 90,000 = Rp. 63,000
0.35 Oh Tukang Rp. 125,000 = Rp. 43,750
0.035 Oh Kepala Tukang Rp. 150,000 = Rp. 5,250
0.035 Oh Mandor Rp. 125,000 = Rp. 4,375
Jumlah Rp. 261,199

39 PEKERJAAN 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG


Bahan Harga Satuan
1.488 M1 C-75, 0.8 Rp. 13,000 = Rp. 19,344
2.232 M1 C-65, 0.6 Rp. 12,000 = Rp. 26,784
38 Bh Baut (Screw Driver) Rp. 500 = Rp. 19,000
1.6 Bh Dynabolt Rp. 4,000 Rp. 6,400
5.4 M1 Reng Rp. 7,500 Rp. 40,500
0.124 M1 Talang jurai Rp. 28,333 Rp. 3,513
Tenaga
0.2 Oh Pekerja Rp. 90,000 = Rp. 18,000
0.45 Oh Tukang Rp. 125,000 = Rp. 56,250
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.05 Oh Mandor Rp. 125,000 = Rp. 6,250
Jumlah Rp. 197,541

40 PEKERJAAN 1 M2 PASANG ATAP GENTENG METAL


Bahan Harga Satuan
1.33 Lbr Atap Genteng Metal Tebal Rp. 60,300 = Rp. 80,199
0.2 Kg Sekrup / Sekrup Gypsum Rp. 20,000 = Rp. 4,000
Tenaga
0.2 Oh Pekerja Rp. 90,000 = Rp. 18,000
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.05 Oh Mandor Rp. 125,000 = Rp. 6,250
Jumlah Rp. 122,449
41 PEKERJAAN 1 M1 NOK ATAP METAL
Bahan Harga Satuan
0.3 Lbr Bubungan Atap Genteng Metal Rp. 20,000 = Rp. 6,000
0.05 Kg Sekrup / Sekrup Gypsum Rp. 20,000 = Rp. 1,000
Tenaga
0.15 Oh Pekerja Rp. 90,000 = Rp. 13,500
0.07 Oh Tukang Rp. 125,000 = Rp. 8,750
0.008 Oh Kepala Tukang Rp. 150,000 = Rp. 1,200
0.006 Oh Mandor Rp. 125,000 = Rp. 750
Jumlah Rp. 31,200

42 PEKERJAAN 1 M3 PASANG KUSEN PINTU DAN JENDELA


Bahan Harga Satuan
1.2 M3 Kayu Klas II (Palapi) Rp. 2,666,250 = Rp. 3,199,500
Tenaga
6 Oh Pekerja Rp. 90,000 = Rp. 540,000
20 Oh Tukang Rp. 125,000 = Rp. 2,500,000
2 Oh Kepala Tukang Rp. 150,000 = Rp. 300,000
0.3 Oh Mandor Rp. 125,000 = Rp. 37,500
Jumlah Rp. 6,577,000

43 PEKERJAAN 1 M2 PASANG DAUN PINTU PANEL KAYU


Bahan Harga Satuan
0.04 M3 Kayu Klas II (Palapi) Rp. 2,666,250 = Rp. 106,650
Tenaga
1 Oh Pekerja Rp. 90,000 = Rp. 90,000
2.5 Oh Tukang Rp. 125,000 = Rp. 312,500
0.25 Oh Kepala Tukang Rp. 150,000 = Rp. 37,500
0.05 Oh Mandor Rp. 125,000 = Rp. 6,250
Jumlah Rp. 552,900

44 PEKERJAAN 1 M2 PASANG DAUN PINTU / JENDELA KACA


Bahan Harga Satuan
0.035 M3 Kayu Klas II (Palapi) Rp. 2,666,250 = Rp. 93,319
Tenaga
0.8 Oh Pekerja Rp. 90,000 = Rp. 72,000
2 Oh Tukang Rp. 125,000 = Rp. 250,000
0.2 Oh Kepala Tukang Rp. 150,000 = Rp. 30,000
0.04 Oh Mandor Rp. 125,000 = Rp. 5,000
Jumlah Rp. 450,319
45 PEKERJAAN 1 M2 PASANG KACA RYBEN TEBAL 5 MM
Bahan Harga Satuan
1.1 M2 Kaca Bening Rp. 200,000 = Rp. 220,000
Tenaga
0.015 Oh Pekerja Rp. 90,000 = Rp. 1,350
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.000175 Oh Mandor Rp. 125,000 = Rp. 22
Jumlah Rp. 242,372

46 PEKERJAAN 1 BUAH PASANG KUNCI PINTU 2 SLAGG


Bahan Harga Satuan
1 Bh Kunci Pintu 2 Slagg Rp. 300,000 = Rp. 300,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.5 Oh Tukang Rp. 125,000 = Rp. 62,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.005 Oh Mandor Rp. 125,000 = Rp. 625
Jumlah Rp. 365,525

47 PEKERJAAN 1 SET PASANG ENGSEL PINTU


Bahan Harga Satuan
1 Set Engsel Pintu Rp. 1,000,000 = Rp. 1,000,000
Tenaga
0.015 Oh Pekerja Rp. 90,000 = Rp. 1,350
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.00075 Oh Mandor Rp. 125,000 = Rp. 94
Jumlah Rp. 1,022,444

48 PEKERJAAN 1 SET PASANG ENGSEL JENDELA


Bahan Harga Satuan
1 Set Engsel Jendela Rp. 30,000 = Rp. 30,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.0005 Oh Mandor Rp. 125,000 = Rp. 63
Jumlah Rp. 44,963
49 PEKERJAAN 1 BUAH PASANG GRENDEL PINTU BIASA
Bahan Harga Satuan
1 Bh Grendel Pintu Rp. 30,000 = Rp. 30,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.0005 Oh Mandor Rp. 125,000 = Rp. 63
Jumlah Rp. 44,963

50 PEKERJAAN 1 BUAH PASANG GRENDEL JENDELA


Bahan Harga Satuan
1 Bh Grendel Jendela Rp. 20,000 = Rp. 20,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.0005 Oh Mandor Rp. 125,000 = Rp. 63
Jumlah Rp. 34,963

51 PEKERJAAN 1 BUAH PASANG HANDEL JENDELA


Bahan Harga Satuan
1 Bh Handel Jendela Rp. 20,000 = Rp. 20,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.0005 Oh Mandor Rp. 125,000 = Rp. 63
Jumlah Rp. 34,963

52 PEKERJAAN 1 SET PASANG HAK KAIT ANGIN UNTUK JENDELA BUKA


Bahan Harga Satuan
1 Psg Hak Kait Angin Rp. 25,000 = Rp. 25,000
Tenaga
0.015 Oh Pekerja Rp. 90,000 = Rp. 1,350
0.15 Oh Tukang Rp. 125,000 = Rp. 18,750
0.015 Oh Kepala Tukang Rp. 150,000 = Rp. 2,250
0.00075 Oh Mandor Rp. 125,000 = Rp. 94
Jumlah Rp. 47,444
53 PEKERJAAN 1 M2 PASANG PLAFOND BAHAN GYPSUMBOARD + RANGKA BESI HOLLOW
Bahan Harga Satuan
0.415 Btg Hollow 4/4 Zincromate Rp. 125,000 Rp. 51,875
0.15 Btg Hollow 2/4 Zincromate Rp. 100,000 Rp. 15,000
0.347 Lbr Gypsumboard (120cm x 240cm) 9mm Rp. 85,000 = Rp. 29,495
0.11 Kg Paku Sekrup / Paku Gypsum Rp. 20,000 = Rp. 2,200
4 Bh Ramset / Dina Bolt Rp. 4,000 Rp. 16,000
0.072 Bh Cotton Plaster Rp. 20,000 Rp. 1,440
0.125 Zak Compoun Rp. 250,000 Rp. 31,250
Tenaga
0.1 Oh Pekerja Rp. 90,000 = Rp. 9,000
0.05 Oh Tukang Rp. 125,000 = Rp. 6,250
0.005 Oh Kepala Tukang Rp. 150,000 = Rp. 750
0.005 Oh Mandor Rp. 125,000 = Rp. 625
Jumlah Rp. 163,885

54 PEKERJAAN 1 M2 MENDEMPUL DAN MENGGOSOK KAYU


Bahan Harga Satuan
0.08 Kg Dempul Kayu Rp. 20,000 = Rp. 1,600
0.02 Kg Minyak Cat Rp. 25,000 = Rp. 500
0.01 Lbr Kertas Pasir Rp. 5,000 = Rp. 50
Tenaga
0.04 Oh Pekerja Rp. 90,000 = Rp. 3,600
0.04 Oh Tukang Rp. 125,000 = Rp. 5,000
0.004 Oh Kepala Tukang Rp. 150,000 = Rp. 600
0.0025 Oh Mandor Rp. 125,000 = Rp. 313
Jumlah Rp. 11,663

55 PEKERJAAN 10 M2 MENI KAYU


Bahan Harga Satuan
0.84 Kg Cat Meny Rp. 20,000 = Rp. 16,800
0.22 Kg Minyak Cat Rp. 25,000 = Rp. 5,500
Tenaga
0.5 Oh Pekerja Rp. 90,000 = Rp. 45,000
0.75 Oh Tukang Rp. 125,000 = Rp. 93,750
0.075 Oh Kepala Tukang Rp. 150,000 = Rp. 11,250
0.025 Oh Mandor Rp. 125,000 = Rp. 3,125
Jumlah Rp. 175,425
Untuk 1 M2 Meni Kayu ( Anl.Meni Kayu / 10 ) Rp. 17,543
56 PEKERJAAN 1 M2 CAT BIDANG KAYU
Bahan Harga Satuan
0.2 Kg Minyak Cat Rp. 25,000 = Rp. 5,000
0.15 Kg Plamur Kayu Rp. 20,000 = Rp. 3,000
0.17 Kg Cat Kayu ( Dasar ) Rp. 46,500 = Rp. 7,905
0.26 Kg Cat Kayu ( Penutup 2 x ) Rp. 46,500 = Rp. 12,090
Tenaga
0.07 Oh Pekerja Rp. 90,000 = Rp. 6,300
0.009 Oh Tukang Rp. 125,000 = Rp. 1,125
0.006 Oh Kepala Tukang Rp. 150,000 = Rp. 900
0.0025 Oh Mandor Rp. 125,000 = Rp. 313
Jumlah Rp. 36,633

57 PEKERJAAN 1 M2 CAT TEMBOK / PLAFON


Bahan Harga Satuan
0.1 Kg Plamur Tembok Rp. 20,000 = Rp. 2,000
0.1 Kg Cat Tembok ( Dasar ) Rp. 60,000 = Rp. 6,000
0.26 Kg Cat Tembok ( Penutup 2 x ) Rp. 60,000 = Rp. 15,600
Tenaga
0.02 Oh Pekerja Rp. 90,000 = Rp. 1,800
0.063 Oh Tukang Rp. 125,000 = Rp. 7,875
0.0063 Oh Kepala Tukang Rp. 150,000 = Rp. 945
0.0025 Oh Mandor Rp. 125,000 = Rp. 313
Jumlah Rp. 34,533

58 PEKERJAAN 1 M2 PELAPIS KEDAP AIR


Bahan Harga Satuan
2 Kg Cat Lapisan Kedap Air Rp. 70,000 = Rp. 140,000
Tenaga
0.02 Oh Pekerja Rp. 90,000 = Rp. 1,800
0.063 Oh Tukang Rp. 125,000 = Rp. 7,875
0.0063 Oh Kepala Tukang Rp. 150,000 = Rp. 945
0.0025 Oh Mandor Rp. 125,000 = Rp. 313
Jumlah Rp. 150,933
59 PEKERJAAN 1 BUAH CLOSED JONGKOK PORSELEN
Bahan Harga Satuan
1 Unit Closed Jongkok Ex. TOTO CE6 Rp. 435,000 = Rp. 435,000
6 Kg Semen Portland Rp. 1,710 = Rp. 10,260
0.01 M3 Pasir Pasang Rp. 145,000 = Rp. 1,450
Tenaga
1 Oh Pekerja Rp. 90,000 = Rp. 90,000
1.5 Oh Tukang Rp. 125,000 = Rp. 187,500
0.15 Oh Kepala Tukang Rp. 150,000 = Rp. 22,500
0.16 Oh Mandor Rp. 125,000 = Rp. 20,000
Jumlah Rp. 766,710

60 PEKERJAAN 1 BH PASANG FLOOR DRAIN


Bahan Harga Satuan
1 Bh Flor Drain Rp. 75,000 = Rp. 75,000
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.1 Oh Tukang Rp. 125,000 = Rp. 12,500
0.01 Oh Kepala Tukang Rp. 150,000 = Rp. 1,500
0.005 Oh Mandor Rp. 125,000 = Rp. 625
Jumlah Rp. 90,525

61 PEKERJAAN 1 BH PASANG KRAN DINDING Ø 1/2" ATAU Ø 3/4"


Bahan Harga Satuan
1 Bh Kran Dinding stainlees Ø 3/4 " Rp. 190,000 = Rp. 190,000
0.0025 Bh Seal Tape Rp. 7,000 = Rp. 18
Tenaga
0.01 Oh Pekerja Rp. 90,000 = Rp. 900
0.005 Oh Tukang Rp. 125,000 = Rp. 625
0.1 Oh Kepala Tukang Rp. 150,000 = Rp. 15,000
0.01 Oh Mandor Rp. 125,000 = Rp. 1,250
Jumlah Rp. 207,793
62 PEKERJAAN 1 UNIT SEPTICK TANK + PERESAPAN
SEPTICK TANK Harga Satuan
2.685 M3 Galian Tanah Rp. 86,625 = Rp. 232588.125
0.075 M3 Urugan Pasir Rp. 202,250 = Rp. 15168.75
0.69 M3 Urugan Kembali Rp. 19,655 = Rp. 13561.95
0.15 M3 Lantai Beton 1: 2 : 3 T = 8 cm Rp. 8,393,468 = Rp. 1259020.19015625
6.5 M2 Pas. 1/2 Bata 1 Pc : 3 Psr ( Trasram ) Rp. 150,388 = Rp. 977520.05
13 M2 Plesteran 1 Pc : 3 Psr ( Trasram ) Rp. 66,507 = Rp. 864590.48
13 M2 Acian Semen Rp. 15,585 = Rp. 202605
0.172 M3 Beton Plat Penutup T = 8 cm Rp. 8,393,468 = Rp. 1443676.4847125
1 M1 PVC Ø 4" Rp. 40,000 = Rp. 40000
Jumlah Rp. 5,048,731

Palu, 20 November 2017


Dibuat Oleh,

H. SAMSUL RIZAL, S.E


ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III
I PEKERJAAN PERSIAPAN
1 Pek. Pembuatan Direksi Keet Ls
2 Pek. Pembuatan Pagar Seng Gelombang Sementara M'
3 Pek. Pengukuran Dan Pemasangan Bowplank Ls
4 Pek. Pembuatan Papan Nama Proyek Ls

II PEKERJAAN TANAH
1 Pek. Galian Tanah Pondasi Batu Kali + Poor Plat (Bangunan Induk) M3
2 Pek. Galian Tanah Pondasi Batu Kali (Pagar) M3
3 Pek. Urugan Sirtu (Timbunan Peninggi Lantai) T = 20cm (Bangunan Induk) M3
4 Pek. Urugan Pasir Bawah Pondasi Batu Kali dan Poor Plat (Bangunan Induk) M3
5 Pek. Urugan Pasir Bawah Pondasi Batu Kali (Pagar) M3
6 Pek. Urugan Pasir Bawah Lantai (Bangunan Induk) M3
7 Pek. Urugan Kembali (Bangunan Induk) M3
8 Pek. Pemadatan Timbunan (Stamper Kuda 17,3 Kn) Ls
9 Pek. Urugan Pasir Bawah Rabat Beton T=5cm M3

III PEKERJAAN PONDASI


1 Pek. Pas. Pondasi Batu Belah Campuran 1 PC : 5 PSR (Bangunan Induk) M3
2 Pek. Pas. Batu Kosong (Bangunan Induk) M3
3 Pek. Pas. Pondasi Batu Belah Campuran 1 PC : 5 PSR (Pagar) M3
4 Pek. Pas. Batu Kosong (Pagar) M3

IV PEKERJAAN BETON
1 Pek. Lantai Cor Beton T=12cm Camp. 1pc : 3psr : 5krk (Bangunan Induk) M3
2 Pek. Lantai Kerja Poor Plat T=10cm Camp. 1pc : 3psr : 5krk (Bangunan Induk) M3
3 Pek. Poor Plat 120 x 120 x 35 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III
4 Pek. Sloof beton Bertulang 25/40 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
5 Pek. Sloof beton Bertulang 15/40 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
6 Pek. Sloof Beton Bertulang 15/20 Camp. 1pc : 2psr : 3krk (Pagar) M3
7 Pek. Kolom Beton Bertulang 20/20 Camp. 1pc : 2psr : 3krk (Pagar) M3
8 Pek. RingBalk Beton Bertulang 15/20 Camp. 1pc : 2psr : 3krk (Pagar) M3
9 Pek. Kolom Beton Bertulang 30/30 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
10 Pek. Kolom Praktis Beton Bertulang 15/15 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
11 Pek. Balok Lantai Beton Bertulang 25/40 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
12 Pek. Balok Latei Beton Bertulang 15/30 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
13 Pek. RingBalk Beton Bertulang 15/30 Camp. 1pc : 2psr : 3krk (Bangunan Induk) M'
14 Pek. Plat Lantai Beton Bertulang T=12cm Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
15 Pek. Anak Tangga Beton Bertulang Camp. 1pc : 2psr : 3krk (Bangunan Induk) M3
16 Pek. Plat Lantai Bordes Beton Bertulang T=12cm Camp. 1pc : 2psr : 3krk (Bangunan Indu M3
17 Pek. Cor Beton 1pc : 3psr : 5krk (Penghubung Kolom Praktis & Kolom baja) M3
18 Pek. Sunscreen Beton (Plat Kantilever) T=8cm M3
19 Pek. Profil Beton, T=10 cm M'
20 Pek. Rabat Beton samping kiri + Kanan Bangunan T=8cm M3
21 Pek. Rabat Beton Depan (Parkiran) T=10cm M3
ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III

V PEKERJAAN BAJA
1 Pek. Kolom Baja WF (250x125x6x9) Kg
2 Pek. Kuda-kuda Baja WF (250x125x6x9) Kg
3 Pek. Ring Balok Baja WF (250x125x6x9) Kg
4 Pek. Gording CNP (60x30x10x2,3) Kg
5 Pek. Besi Siku Penahan Gording L 50x50x5 Kg
6 Pek. Plat Dudukan Kolom WF 200x340x12 Kg
7 Pek. Plat Pengaku Kg
8 Pek. Plat Penyambung Sudut Kuda-Kuda Baja WF Kg
9 Pek. Plat Kait Ikat Angin (Besi siku 50.50.5 , Panjang 15 cm) Kg
10 Pek. Joint Corner Besi Siku 70.70.7 Kg
11 Pek. Moer & Baut Pengaku Gording , D 6 Bh
12 Pek. Pasang Moer & Baut Penyambung Joint Ancor , D 12 Bh
13 Pek. Baut Angker D16 Penyambung Kolom WF & Kolom Beton Bh
14 Pek. Pengelasan Cm'
15 Pek. Pas. Pintu Besi Metal + Aksesories (Bangunan Induk) Ls

VI PEKERJAAN DINDING & PLESTERAN


1 Pek. Pasangan Dinding 1/2 Bata Camp. 1pc : 5psr (Bangunan Induk) M2
2 Pek. Pasangan Dinding 1/2 Bata Trasram Camp. 1pc : 2psr (Bangunan Induk) M2
3 Pek. Plesteran Dinding Biasa Camp. 1pc : 5psr (Bangunan Induk) M2
4 Pek. Plesteran Dinding Trasram Camp. 1pc : 3psr (Bangunan Induk) M2
5 Pek. Plesteran Beton Camp. 1pc : 3psr (Bangunan Induk) M2
6 Pek. Plesteran Minimalis (Bangunan Induk) M2
7 Pek. Acian Dinding + Beton + Kaki Pondasi (Bangunan Induk) M2
8 Pek. Pasangan Dinding 1/2 Bata Camp. 1pc : 5psr (Pagar) M2
9 Pek. Plesteran Dinding Biasa Camp. 1pc : 5psr (Pagar) M2
10 Pek. Acian Dinding + Beton + Kaki Pondasi (Pagar) M2

VII PEKERJAAN LANTAI


ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III
1 Pek. Pasangan Lantai Keramik 40 X 40 cm (ex. Roman) M2
2 Pek. Plint Keramik 10 x 40 cm M'
3 Pek. Pasangan Dinding Keramik 20 x 25 KM/WC (ex.Standard) M2
4 Pek. Pasangan Laintai Keramik 20 x 20 KM/WC (ex. Standard) M2

VIII PEKERJAAN ALUMINIUM & KACA


1 Pek. Pasang Kusen Aluminium (Pintu, Jendela, Ventilasi) 4 inci M1
2 Pek. Pasang Daun Pintu Rangka Allumunium Lapis Playwood Motif M2
3 Pek. Pasang Daun Jendela Kaca Rangka Allumunium M2
4 Pek. Pas. Kanopi (Allumunium Composit + Besi Hollow) Ex. Allucopan M2
5 Pek. Pasang Kaca Rayban 5 mm (Pintu, Jendela, Jalusi) M2

IX PEKERJAAN ATAP
1 Pek. Pasang Atap Lapis Zincalume M2
2 Pek. Pas. Ikatan Angin (Bracing) Bh
3 Pek. Pasang Nok Lapis Zincalume M'
4 Pek. Pasang Ventilator Bh
5 Pek. Pasang Langit-langit Gypsum (Rangka Allumunium) M2
6 Pek. Pasang List Gypsum M'
ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III

X PEKERJAAN PENGECETAN
1 Pek. Cat Tembok (Ex. Moxilex) M2
2 Pek. Cat Plafond (Ex. Mowilex) M2
3 Pek. Cat Waterproof M2
4 Pek. Cat konstruksi baja dengan Zinc Chromate M2

XI PEKERJAAN PENGGANTUNG
1 Pek. Pas Engsel Pintu (type Kupu-kupu Stainless Steel) Bh
2 Pek. Pas Engsel Jendela (type Kupu-kupu Stainless Steel) Bh
3 Pek. Pas. Kunci Tanam Pintu Allumunium Set
4 Pek. Pas. Door Holder Pintu Allumunium (ex. Dekkson PH801_32X300) Bh
5 Pek. Pas. Grendel Jendela (Type Handle & Lock) Bh
6 Pek. Pas. Kait Angin Jendela Bh

XII PEKERJAAN INSTALASI LISTRIK


1 Pek. Penyambungan Listrik 3000 watt Baru & Kilometer Ls
2 Pek. Pemasangan Panel SDP Unit
3 Pek. Pemasangan Instalasi Armatur Titik
4 Pek. Pemasangan Saklar Ganda Tanam (Ex. National) Bh
5 Pek. Pemasangan Stop Kontak Tanam (Ex. National) Bh
6 Pek. Pemasangan Stop Kontak Tanam 3 Phase (Ex. National) Bh
7 Pek. Pemasangan Stop Kontak AC (Ex. National) Bh
8 Pek. Pasang Lampu SL 80 Watt Bh
9 Pek. Pas. Down Light 4 inch (frame cool white)+ Lampu SL 14 Watt Bh

XIII PEKERJAAN SANITASI, INSTALASI AIR BERSIH & KOTOR


1 Pek. Instalasi Air Bersih dan acessories Ls
2 Pek. Instalasi Air Kotor & Acessories Ls
ENGINEERING ESTIMATE ( E
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

No URAIAN PEKERJAAN SATUAN

I II III
3 Pek. Pas. Kloset Jongkok "TOTO" Psg
4 Pek. Saluran Air Hujan M'
5 Pek. Septick Tank+Peresapan Unit

XIV PEKERJAAN LAIN - LAIN


1 Pek. Pas. Fire Protection Portable 9 Kg (Tabung Pemadam Kebakaran) Bh
2 Pek. Railing Tangga Besi Hollow M2
3 Pek. Pintu Pagar Besi Plat Motif Baja M2
4 Pek. Pagar Besi Ulir Samping Kiri (Arah Pertigaan) M2
5 Pek. Dokumentasi Proyek Ls
6 Pek. Pembersihan Akhir Ls
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI

1.00 Rp 6,000,000.00 Rp 6,000,000.00


150.00 Rp 127,070.00 Rp 19,060,500.00
1.00 Rp 37,867.50 Rp 37,867.50
1.00 Rp 500,000.00 Rp 500,000.00
Rp 25,598,367.50

77.31 Rp 70,625.00 Rp 5,460,160.00


37.32 Rp 70,625.00 Rp 2,635,684.39
142.44 Rp 199,625.00 Rp 28,433,686.69
7.74 Rp 202,250.00 Rp 1,564,606.00
3.39 Rp 202,250.00 Rp 686,168.52
252.00 Rp 202,250.00 Rp 50,967,000.00
33.15 Rp 19,655.00 Rp 651,563.25
1.00 Rp 2,000,000.00 Rp 2,000,000.00
17.26 Rp 202,250.00 Rp 3,489,950.16
Rp 95,888,819.00

48.75 Rp 775,865.00 Rp 37,823,418.75


20.00 Rp 426,915.00 Rp 8,538,300.00
29.28 Rp 775,865.00 Rp 22,720,236.69
13.57 Rp 426,915.00 Rp 5,793,535.39
Rp 74,875,490.83

86.40 Rp 859,180.00 Rp 74,233,152.00


2.74 Rp 859,180.00 Rp 2,350,716.48
11.46 Rp 3,228,032.15 Rp 36,983,564.31
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI
12.50 Rp 3,305,754.83 Rp 41,321,935.35
0.36 Rp 4,601,432.75 Rp 1,656,515.79
3.70 Rp 4,848,724.19 Rp 17,945,613.10
2.40 Rp 5,400,114.86 Rp 12,960,275.65
3.70 Rp 5,332,149.36 Rp 19,734,817.98
17.82 Rp 4,256,679.05 Rp 75,854,020.61
0.39 Rp 6,714,096.49 Rp 2,643,339.79
2.95 Rp 4,058,607.83 Rp 11,972,893.09
4.66 Rp 5,899,328.57 Rp 27,476,122.81
8.65 Rp 5,332,149.36 Rp 46,123,091.93
3.25 Rp 5,945,265.29 Rp 19,326,868.40
1.07 Rp 4,256,679.05 Rp 4,558,903.26
0.16 Rp 4,792,615.68 Rp 787,906.02
2.83 Rp 859,180.00 Rp 2,429,527.55
0.60 Rp 8,393,467.93 Rp 5,036,080.76
21.30 Rp 125,000.00 Rp 2,662,500.00
3.20 Rp 668,003.49 Rp 2,137,611.17
30.51 Rp 668,003.49 Rp 20,381,621.55
Rp 428,577,077.60
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI

5,209.60 Rp 24,000.00 Rp 125,030,400.00


7,163.20 Rp 24,000.00 Rp 171,916,800.00
1,322.01 Rp 24,000.00 Rp 31,728,312.00
2,041.60 Rp 24,000.00 Rp 48,998,400.00
39.45 Rp 24,000.00 Rp 946,704.00
88.71 Rp 24,000.00 Rp 2,129,053.44
114.74 Rp 24,000.00 Rp 2,753,654.40
323.74 Rp 24,000.00 Rp 7,769,772.05
50.75 Rp 24,000.00 Rp 1,218,043.20
105.68 Rp 24,000.00 Rp 2,536,356.00
200.00 Rp 19,000.00 Rp 3,800,000.00
500.00 Rp 19,000.00 Rp 9,500,000.00
264.00 Rp 45,000.00 Rp 11,880,000.00
4,500.00 Rp 2,000.00 Rp 9,000,000.00
2.00 Rp 12,950,000.00 Rp 25,900,000.00
Rp 455,107,495.09

775.18 Rp 143,092.80 Rp 110,922,676.70


7.80 Rp 150,387.70 Rp 1,173,024.06
1,534.76 Rp 62,509.64 Rp 95,937,295.09
15.60 Rp 66,506.96 Rp 1,037,508.58
344.00 Rp 66,506.96 Rp 22,878,394.24
24.00 Rp 66,506.96 Rp 1,596,167.04
1,878.76 Rp 15,585.00 Rp 29,280,474.60
226.16 Rp 143,092.80 Rp 32,362,153.83
452.32 Rp 62,509.64 Rp 28,274,610.40
148.04 Rp 15,585.00 Rp 2,307,265.74
Rp 325,769,570.28
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI
56.00 Rp 343,083.00 Rp 19,212,648.00
46.47 Rp 35,813.60 Rp 1,664,257.99
7.80 Rp 261,199.00 Rp 2,037,352.20
2.25 Rp 261,199.00 Rp 587,697.75
Rp 23,501,955.94

32.88 Rp 134,145.50 Rp 4,410,704.04


3.28 Rp 840,409.50 Rp 2,756,543.16
0.68 Rp 741,797.00 Rp 504,421.96
75.94 Rp 350,000.00 Rp 26,579,000.00
7.03 Rp 192,725.50 Rp 1,354,860.27
Rp 35,605,529.43

845.90 Rp 122,449.00 Rp 103,579,609.10


40.00 Rp 250,000.00 Rp 10,000,000.00
40.00 Rp 86,700.00 Rp 3,468,000.00
9.00 Rp 1,200,000.00 Rp 10,800,000.00
58.00 Rp 146,292.00 Rp 8,484,936.00
48.00 Rp 39,672.00 Rp 1,904,256.00
Rp 138,236,801.10
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI

1,534.76 Rp 34,532.50 Rp 52,999,099.70


58.00 Rp 34,532.50 Rp 2,002,885.00
10.84 Rp 150,932.50 Rp 1,635,636.64
311.67 Rp 17,500.00 Rp 5,454,247.03
Rp 62,091,868.37

3.00 Rp 35,525.50 Rp 106,576.50


4.00 Rp 30,713.00 Rp 122,852.00
3.00 Rp 151,065.00 Rp 453,195.00
2.00 Rp 192,345.00 Rp 384,690.00
4.00 Rp 56,525.50 Rp 226,102.00
4.00 Rp 32,525.50 Rp 130,102.00
Rp 1,423,517.50

1.00 Rp 7,500,000.00 Rp 7,500,000.00


1.00 Rp 2,666,725.00 Rp 2,666,725.00
39.00 Rp 148,375.00 Rp 5,786,625.00
5.00 Rp 34,725.00 Rp 173,625.00
13.00 Rp 28,725.00 Rp 373,425.00
3.00 Rp 88,725.00 Rp 266,175.00
2.00 Rp 88,725.00 Rp 177,450.00
18.00 Rp 325,000.00 Rp 5,850,000.00
12.00 Rp 160,725.00 Rp 1,928,700.00
Rp 24,722,725.00

1.00 Rp 5,000,000.00 Rp 5,000,000.00


1.00 Rp 6,000,000.00 Rp 6,000,000.00
ING ESTIMATE ( EE )

VOLUME HARGA SATUAN JUMLAH HARGA

IV V VI
1.00 Rp 766,710.00 Rp 766,710.00
93.00 Rp 219,301.83 Rp 20,395,070.56
1.00 Rp 5,048,731.03 Rp 5,048,731.03
Rp 37,210,511.59

5.00 Rp 2,120,000.00 Rp 10,600,000.00


11.00 Rp 300,000.00 Rp 3,300,000.00
20.00 Rp 350,000.00 Rp 7,000,000.00
18.78 Rp 350,000.00 Rp 6,573,000.00
1.00 Rp 1,000,000.00 Rp 1,000,000.00
1.00 Rp 1,500,000.00 Rp 1,500,000.00
Rp 29,973,000.00
ENGINEERING ESTIMATE ( EE )
KEGIATAN :
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

REKAPITULASI
No Uraian Pekerjaan Jumlah Harga
I II III
I PEKERJAAN PERSIAPAN Rp.
II PEKERJAAN TANAH Rp.
III PEKERJAAN PONDASI Rp.
IV PEKERJAAN BETON Rp.
V PEKERJAAN BAJA Rp.
VI PEKERJAAN DINDING DAN PLESTERAN Rp.
VII PEKERJAAN LANTAI Rp.
VIII PEKERJAAN ALLUMUNIUM, & KACA Rp.
IX PEKERJAAN PASANG ATAP Rp.
X PEKERJAAN PENGECETAN Rp.
XI PEKERJAAN PENGGANTUNG Rp.
XII PEKERJAAN INSTALASI LISTRIK Rp.
XIII PEKERJAAN SANITASI Rp.
XIV PEKERJAAN LAIN-LAIN Rp.

TOTAL BIAYA KOSTRUKSI Rp.


DIBULATKAN Rp.
Terbilang :
SATU MILYAR TUJUH RATUS LIMA PULUH DELAPAN JUTA LIMA RATUS DELAPAN PULUH
RIBU RUPIAH

Di Setujui, Diperiksa, Di Buat,


Pejabat Pembuat Komitmen Mengetahui,
PENGELOLA TEKNIS Konsultan Perencana
KEPALA KANTOR WILAYAH
BADAN PERTANAHAN NASIONAL CV. GEOMETRIC KONSULTAN TEKNIK
PROVINSI SULAWESI TENGAH

MUH. HATTA, A. PTNH SYAHRUL, ST CAHYADINATA FATWA


NIP. 19691116 199203 1 002 NIP.
DR. 19780831
Drs. 200901 1 M.Eng
J. P. TAMTOMO, 006 DIREKTUR
NIP. 19541020 197801 1 002
MATE ( EE )

ASI
Jumlah Harga
III
25,598,367.50
95,888,819.00
74,875,490.83
428,577,077.60
455,107,495.09
325,769,570.28
23,501,955.94
35,605,529.43
138,236,801.10
62,091,868.37
1,423,517.50
24,722,725.00
37,210,511.59
29,973,000.00

1,758,582,729.24
1,758,582,000.00

JUTA LIMA RATUS DELAPAN PULUH DUA

Di Buat,
Palu,
Konsultan 20 November 2017
Perencana
Dibuat Oleh,
NAL CV. GEOMETRIC KONSULTAN TEKNIK
H

H. SAMSUL RIZAL, S.E

CAHYADINATA FATWA
Eng DIREKTUR
2