STANDAR HARGA SATUAN BAHAN BANGUNAN DAN UPAH KERJA

PEMERINTAH PROVINSI SULAWESI SELATAN


KABUPATEN BARRU
TAHUN 2019
Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
A BAHAN DASAR
1 Batu Gunung / Kali M³ 157,143
2 Batu Belah/ Chipping M³ 325,000
3 Gorong2 Beton dia.80 cm M' 200,000
4 Gorong2 Beton dia.100 cm M' 240,000
5 Paving Block 6 cm Bj 1,600
6 Paving Block 8 cm 2,000
7 Pasir M³ 157,143
8 Timbunan Pilihan M³ 35,000
9 Batu Bata Buah 650
10 Bambu uk.9x19x39 cm Btg 20,000
11 Portland Semen batu belah pondasi
* Merk Tonasa Kg 1,200
* Mer Bosowa Kg 1,125
12 Semen Putih ( 20 kg/zak ) Kg 3,600

B BAHAN BESI
1 Besi Beton Kg 11,000
2 Besi Beton Ǿ 5 Btg 22,000
3 Besi Beton Ǿ 6 Btg 30,400
4 Besi Beton Ǿ 8 Btg 54,050
5 Besi Beton Ǿ 10 Btg 80,500
6 Besi Beton Ǿ 12 Btg 115,000
7 Besi Beton Ǿ 14 Btg 166,750
8 Besi Beton Ǿ 16 Btg 201,300
9 Besi Beton Ǿ 18 Btg 166,100
10 Besi Beton Ǿ 20 Btg 188,400
11 Besi Beton Ǿ 22 Btg 211,700
12 Kawat Beton kg 20,000
13 Kawat Duri roll 175,000
14 Kawat Ram M³ 28,800
15 Mur/Baut diameter 20 mm Kg 7,200
16 Mur/Baut diameter 25 mm bh 7,200
17 Mur/Baut diameter 18 mm bh 6,500
18 Mur/Baut diameter 10 mm bh 5,000
19 Beugel U.40.40 mm bh 27,200
20 Beugel Strip 40.40 mm bh 22,600
21 Paku Gording panjang . 5 cm kg 27,900
5 Paku Biasa 6-10 cm kg 23,000
6 Paku Biasa 2-5 cm kg 25,000
7 Paku Seng Biasa kg 50,000
8 Paku Beton dos 28,750
9 Paku Asbes kg 45,000
10 Paku Les kg 20,700
11 Trali Naco (Besi Batangan) btg 30,400
12 Rangka Naco/Batang daun 20,500

C BAHAN LANTAI DAN DINDING


1 Tegel Keramik Warna 40 x 40 cm dos 76,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
2 Tegel Keramik Warna 60 x 60 cm dos 160,000
3 Tegel Keramik 30 x 30 cm ( Polos ) dos 60,800
4 Tegel Keramik 20 x 20 cm (Alur ) dos 65,800
5 Tegel Keramik 20 x 20 cm (Polos ) dos 57,700
6 Tegel Ubin warna 20 x 20 cm dos 65,800
7 Tegel Plin 10 x 31 Buah 10,700
8 Paving Blok tebal 6 cm biji 2,700
9 Teakwoond 120 x 240 cm tebal 3 mm lbr 55,700
10 Loster Kramik Buah 27,000
11 Loster Beton Biasa Buah 20,000
12 Loster Beton Kecil Buah 15,000

D. BAHAN KAYU
1 Kayu Kelas I Jenis ULIN
Balok M3 13,000,000
Papan M3 13,500,000
2 Kayu Kelas I Jenis BAYAM
Balok M3 12,000,000
Papan M3 12,500,000
3 Kayu Kelas II Jenis Kapur
Balok M3 7,000,000
Papan M3 7,500,000
4 Kayu Kelas II
Balok M3 2,000,000
Papan M3 2,500,000
5 Les Kayu Plafond 1 x 4 cm kls II M' 5,800

E BAHAN ATAP
1 Seng Gelombang BWG 32" BJLS 0,25 mm lbr 90,300
2 Seng BWG 33" BJLS 0,20 mm kaki 9,030
3 Bumbungan Seng 90 x 180 cm lbr 50,000
4 Seng Plat BWG 28" lbr 113,200
5 Seng Spandek 0,3 mtr 40,000
6 Seng Spandek 0,3 Warna mtr 45,000
7 Seng Spandek 0,35 mtr 50,000
8 Seng Spandek 0,35 Warna m 47,500
9 Seng Spandek 0,4 mtr 52,500
10 Seng Spandek 0,4 Wana mtr 57,500
11 Seng Gelombang BWG 33" kaki 9,800
12 Karet Talang m 15,000
13 Multi Roof lbr 85,000
14 Nok Multi Roof lbr 27,000
15 Surya Roof lbr 49,000
16 Nok Surya Roof lbr 39,000
17 Main Trus C 85 btg 50,300
18 Reng U Type 41 btg 79,100
19 Screw Spandek dos 65,000
20 Screw 12-14x20 Biji 600
21 Screw 10 - 16 x 16 Biji 500
22 Baaut Dinabolt Biji 5,000

F BAHAN KACA
1 Kaca Bening Tebal 3 mm M2 45,000
2
2 Kaca Bening Tebal 5 mm M 175,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5

G BAHAN KUNCI DAN PENGGANTUNG


1 Kunci Tanam 2x Putar Buah 110,000
2 Kunci lemari mutu baik Pasang 20,300
3 Engsel Pintu ( Kuningan) Buah 25,300
4 Engsel Jendela ( Kuningan) Buah 20,300
5 Grendel Pintu dan Jendela Buah 22,600
6 Hak Angin / Hak Angin Lipat / No.7" Pasang 15,000
7 Pegangan / Tarikan Jendela + Pintu Buah 10,000
8 Kait Jendela Jungkit / Kait Angin Buah 11,550
9 Gembok no.5 Buah 35,000

H BAHAN CAT
1 Cat Meni Kayu/Besi Kg 27,000
2 Minyak Bekisting liter 25,000
3 Cat Kayu Kg 58,000
4 Cat Besi Merk Avian Kg 63,250
5 Minyak Cat ( afduner ) Ltr 28,000
6 Kertas Gosok ( amplas ) Lbr 8,000
7 Cat Tembok kg 65,000
8 Bahan Anti Rayap kg/ltr 33,000
9 Rol buah 25,000
10 Clear kaleng 63,250
11 Plamur kg 60,800
12 Politur kg 65,800
13 Dempul kg 35,500
14 Cat Tembok "Aries" 4kg 41,000
15 Cat Tembok "Maritex" kg 66,000
16 Cat Tembok "Avitex" 5kg 110,000

I. BAHAN SANITASI
1 Floor Drain Buah 20,000
2 Dol Penguras Buah 15,000
3 Closed Jongkok Buah 350,000
4 Closed Jongkok Buah 1,050,000
5 Closed Duduk Buah 900,000
6 Closed Duduk Buah 375,000
7 Urinoir Keramik Buah 500,000
8 Waestapel set 1,750,000
9 Waestapel Set 450,000
10 Pipa PVC Type D Diameter 4" Batang 150,000
11 Pipa PVC Type D Diameter 3" Batang 90,000
12 Pipa PVC Type D Diameter 2" Batang 65,000
13 Pipa PVC Type D Diameter 3/4" Batang 28,000
14 Pipa PVC Type D Diameter 1/2" Batang 21,000
15 Pipa PVC Type AW Diameter 4" Batang 260,000
16 Pipa PVC Type AW Diameter 3" Batang 175,000
17 Pipa PVC Type AW Diameter 2" Batang 85,000
18 Pipa PVC Type AW Diameter ¾" Batang 30,000
19 Pipa PVC Type AW Diameter ½" Batang 25,000
20 Kran Air 1/2" Merek Amico Buah 28,800
21 Kran Air 3/4" Merek Amico Buah 35,000
22 Sambungan T dan L PVC Dia. 2" Buah 9,200
23 Sambungan L 4" Buah 25,000
24 Sambungan L 3" Buah 13,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
25 Pas. Sambungan Elbo 3/4" Buah 3,000
26 Pas. Sambungan Elbo 1/2" Buah 2,500
27 Pas. Sambungan T 1/2" Buah 3,000
28 Pas. Sambungan T 3/4" Buah 4,000
29 Sambungan T 4" Buah 25,000
30 Sambungan T 3" Buah 13,000
31 Pas. Socket 3/4" Buah 3,000
32 Pas. Sambungan Lurus 1/2" Buah 3,000
33 Lem Pipa @45 gram Tube 65,000
34 Pompa Air Penampungan Air Excel Buah 2,500,000
35 Pompa Air Shimizu unit 1,485,000
36 Pelampung Air ONDA unit 166,000
37 Radar Sintung Otomatis Air buah 74,000
38 Tower Penampungan Air T=5,60 m LA=2 m2 B=3 m2 unit 7,500,000

J BAHAN LISTRIK
1 Sekring Kas 2 Grup Buah 26,200
2 Saklar Tunggal Broco Buah 21,300
3 Saklar Ganda Broco Buah 26,500
4 Saklar Tiga Buah 30,000
5 Stop Kontak Buah 33,000
6 Lampu SL 20 Watt Buah 52,800
7 Lampu SL 15 Watt Buah 49,000
8 Pintting Lampu Pijar Buah 22,600
9 Lampu Pijar 18 Watt "Philips" Buah 45,300
10 Lampu Pijar 15 Watt "Philips" Buah 47,600
11 Lampu Pijar 40 Watt "Philips" Buah 75,500
12 Pipa Pengaman Kabel Batang 12,100
13 Kabel NYM 2 x 2.5 mm2 buah 10,500
14 Kabel NYM 3 x 2.5 mm2 buah 14,740

K BAHAN LANGIT - LANGIT


1 Asbes Semen (Eternit) 1 x 1 Meter 3 mm lbr Lembar 45,000
2 Triplex (1,20 x 2,40 ) cm t = 3 mm Lembar 55,000
3 Triplex (1,20 x 2,40 ) cm t = 4 mm Lembar 70,000
4 Triplex (1,20 x 2,40 ) cm t = 6 mm Lembar 80,000
5 Triplex (1,20 x 2,40 ) cm t = 9 mm Lembar 120,000
6 Calsibord Lembar 55,000
7 Gibsun M2 75,000

L BAHAN JALAN
1 Sirtu M3 115,000
2 Aspal Bitumen Kg 13,700
3 Minyak Tanah Industri Liter 14,000
4 Karet Elastomerit Buah 2,063,200
5 Plastik Alas Cor M2 4,700
6 Minyak Pelumas Ltr 64,700
7 Bronjong jadi 2,7 mm Kg 280,000

M SUB BIDANG HARGA UPAH PEKERJAAN KONSTRUKSI


1 Mandor Org/Hr 103,000
2 Mekanik Org/Hr 108,000
3 Mekanik Pembantu Org/Hr 79,000
4 Tukang Kepala Org/Hr 103,000
5 Tukang Org/Hr 92,000

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018


Dalam Rupiah (Rp)

NO BAHAN DASAR SPESIFIKASI SATUAN HARGA

1 2 3 4 5
6 Operator Org/Hr 105,000
7 Operator Tak Terlatih Org/Hr 78,000
8 Pembantu Operator Org/Hr 70,500
9 Sopir Org/Hr 110,500
10 Sopir Personil Org/Hr 70,500
11 Pembantu Sopir Org/Hr 67,000
12 Buruh Tak Terlatih Org/Hr 67,000
13 Buruh Agak Terlatih Org/Hr 68,050
14 Buruh Terlatih Org/Hr 68,050

Harga Satuan Bahan Bangunan dan Upah KerjaTriwulan IV Tahun 2018