DAFTAR HARGA BAHAN

Pekerjaan : Pembangunan Pilar Balai Desa


Lokasi : Desa Kwadungan, Kec. Kwadungan, Kab. Ngawi
Tahun : 2023

NO NAMA BAHAN SAT HARGA SATUAN

1 Batu Belah / Batu Gunung m3 Rp. 213,000.00


2 Semen Portland @ 40 Kg Zak Rp. 73,125.00
3 Pasir Pasang m3 Rp. 320,000.00
4 Pasir Beton m3 Rp. 330,000.00
5 Pasir Urug m3 Rp. 78,750.00
6 Pipa PVC 1 1/4" Ljr Rp. 45,000.00
7 Sewa Molen Hari Rp. 90,000.00
8 Koral Beton/Batu Pecah 2/3 m3 Rp. 320,625.00
9 Besi Beton Polos Kg Rp. 13,500.00
10 Kawat Beton Kg Rp. 22,500.00
11 Bambu Btg Rp. 16,875.00
12 Paku Biasa Kg Rp. 22,500.00
13 Kayu Begesting m3 Rp. 2,250,000.00
14 Kayu Perencah m3 Rp. 1,687,500.00
15 Minyak Begesting Ltr Rp. 16,875.00
16 Paving Persegi 6 cm m2 Rp. 76,500.00
17 Paving Uskup 6 cm bh Rp. 9,000.00
18 Kantine Uk. 10 x 20 x 40 cm bh Rp. 24,750.00
19 Plywood 120 x 240 x 9 mm Lbr Rp. 174,375.00
20 Benang Roll Rp. 5,000.00
21 Ember Cor Bh Rp. 15,000.00
22 Pilar Bulat Diameter 25 cm Bh Rp. 587,500.00

DAFTAR UPAH TENAGA

NO URAIAN SAT HARGA SATUAN

1 Tukang Kayu OH Rp. 100,000.00


2 Tukang Batu OH Rp. 100,000.00
3 Tukang Cat OH Rp. 100,000.00
4 Tukang Listrik OH Rp. 100,000.00
5 Tukang Besi OH Rp. 100,000.00
6 Tukang Las Konstruksi OH Rp. 100,000.00
7 Tukang Aluminium OH Rp. 100,000.00
8 Pekerja OH Rp. 85,000.00

Kwadungan, 2023
Dibuat Oleh :
Kasi Kesejahteraan

MAYANGSARI