NO URAIAN
1 2
I HARGA BAHAN/MATERIAL
1 Tanah Urug
2 Pasir Urug
3 Pasir Beton
4 Pasir Pasangan
5 Koral Beton
6 Paving Stone (T = 6 cm) Abu - Abu
7 Paving Stone (T = 6 cm) Warna
8 Paving Stone (T = 8 cm) Abu - Abu
9 Paving Stone (T = 8 cm) Warna
10 Paving Stone 20x20 (T = 10 cm) K350
11 Batu Belah 15/20 Cm
12 Batu Bata Pasangan
13 Batu Palimanan
14 Batako
15 Batu Sikat Hitam
16 Batu Sikat Warna
17 Semen 50 Kg (Gresik)
18 Semen (Gresik)
19 Semen Warna
20 Besi Beton
21 Kawat Beton
22 Kawat 4mm
23 Besi Strip / Begel
24 Paku
25 Paku Lis
26 Paku 12 cm
27 Paku sekrup
28 Paku Beton
29 Kayu Bingkarai 6/12
30 Kayu Bingkarai Balok
31 Kayu Bingkarai Papan 3/20
32 Kayu Meranti Usuk 5/7
33 Kayu Begesting
34 Kayu Meranti Usuk 4/6
35 Kayu Kamper Balok
36 Kayu Kamper Usuk
37 Kayu Kamper Papan
38 Kayu Meranti Papan
39 Kayu Balok Klas II
40 Kayu Kamper di Profil
Kayu Papan Kruing
41 Kanstin Segilima K 225
42 Dolken kayu 8 " - 10 '/4 m
43 Koral Beton
44 Keramik Lantai 80 x 80 Cm Nero Granito
45 Keramik Tangga 40 x 40 Cm Nero Granito
46 Keramik Lantai WC 60 x 60 Cm Nero Granito Anti Slip
47 Keramik Dinding WC 30 x 60 Cm Nero Granito
48 Keramik Meja Wastafel 60 x 60 Cm Nero Granito
49 Keramik Granit Star Black 60x60 WC
50 Keramik Plin
51 Ubin Pemandu Tuna Netra Kuning
52 Genteng Kodok Karang Pilang
53 Bubungan
54 Mudra Fiber
55 Ikut Celedu Fiber
56 Lem Kayu
57 Cat Besi
58 Dempul
59 Cat Dasar
60 Cat Penutup 2 x
61 Cat Pelapis
62 Cat Anti Air
63 Vernis
64 Polituran
65 Amplas
66 Kuas
67 Plamur
68 Masterseal 440
69 Akustik 60 cm x 120 cm
70 Teakwood 3 mm
71 Gypzum
72 List Palfond Gypzum
Karet Talang
73 Kalsibord 4 mm
74 Multipeks 9 mm
75 Minyak Bekesting
76 Saklar Tunggal
77 Saklar Ganda
78 Stop Kontak
79 Panel MDP
80 Panel SDP
81 Penangkal Petir
82 Kabel 4 x 16 mm
83 Kabel 4 x 4 mm
84 Kabel 2 x 16 mm
85 Kabel 2 x 2,5 mm
86 Titik Lampu
87 Lampu RMI SK -PREMIUM T8 (2 X 36 W)EBC - 54
88 Lampu TL RM ALML 2 x 36 Watt
89 Lampu Down Light SK-401-2K-ADJ
90 Lampu Down Light SL 20 Watt
91 Lampu Gantung
92 Lampu Spot Light 20 Watt
93 Saklar Tunggal
94 Saklar Ganda
95 Stop Kontak
96 AC daikin 2 PK
97 MCB
98 Genzet Perkim 100.000 Watt
99 Grendel Pintu
100 Grendel Jendela
101 Engsel Jendela
102 Engsel Pintu Kupu-Kupu
103 Kait Angin Jendela
104 Kunci Pintu Yalle
105 Kunci Pintu Yuri
106 Kunci Slot
107 Door Closer
108 Bemper Goat
109 Kloset Duduk Toto Type Avante VW 821 J"/SW 821 JP
110 Kloset Jongkok
111 Bak Mandi Fiberglass
112 Wastafel Komplit Top Counter Toto Type Cerabo LW
113 Urinoir Toto U 57 M Bodi
114 Partisi Urinoir A 100
115 Bak Sink (Ex Royal)
116 Floor Drain Toto Type Tx 1 Bv 1 "Square Flange"
117 Kran Air Toto T 205 LCSC
118 Jet Spray
119 Shower Spray
120 Pompa Air 250 Watt
121 Profil Tank 1000 Liter
122 Exhause Fan
123 Pipa PVC AW Ø 1,5 "
124 Pipa PVC AW Ø 2 "
125 Pipa PVC AW Ø 3 "
126 Pipa PVC AW Ø 4 "
127 Pipa Galpanis Ø 1 "
128 Ramset
129 Reling Stainles Steel 2,5 "
130 Ijuk
131 Kaca Bening 55mm
132 Kaca Bening 12mm
133 Siku (Engel)
134 Profil Aluminium "T"
135 Rangka Aluminium Primer 4/4
136 Rangka Aluminium Sekunder 2/4
137 Aluminium Foil
138 Cornice
139 Seal tape
140 Sealant
141 Air
142 Medical Gas Manifold Oxigen (O) Harris Lokal, 2x4Cyl
143 Medical wall Outlet Oxygen (O), pin index, push type
144 Area alarm 1 gas (O)
Pipa Tembaga ASTM B 819 Type L
145 Diameter 3/8"
146 Diameter 1/2"
147 Diameter 5/8"
148 Diameter 3/4"
II UPAH PEKERJA
1 Mandor
2 Kepala Tukang Batu
3 Kepala Tukang Besi
4 Kepala Tukang Kayu
5 Kepala Tukang Cat
6 Pekerja
7 Tukang Batu
8 Tukang Besi
9 Tukang Kayu
10 Tukang Cat
11 Tukang Pipa
AN BAHAN DAN UPAH
HARGA SATUAN
SATUAN
(Rp)
3 4
M3 100,000.00
M3 150,000.00
M3 175,000.00
M3 175,000.00
M3 175,000.00
M2 75,000.00
M3 75,000.00
M2 75,000.00
M3 78,000.00
M3 65,870.00
M3 180,000.00
Bj 1,410.00
M2 140,000.00
Bj 2,700.00
M2 150,000.00
M2 175,000.00
Zak 68,000.00
Kg 1,300.00
Kg 13,000.00
Kg 7,000.00
Kg 17,500.00
Kg 23,000.00
Kg 9,000.00
Kg 12,000.00
Kg 14,000.00
Kg 13,000.00
Kg 15,000.00
Kg 35,000.00
M1 70,000.00
M3 10,000,000.00
M3 10,000,000.00
M3 2,300,000.00
M3 1,500,000.00
M3 2,300,000.00
M3 6,500,000.00
M3 6,500,000.00
M3 6,500,000.00
M3 4,500,000.00
M3 5,000,000.00
M1 35,000.00
M3 6,500,000.00
M1 100,000.00
Btg 75,000.00
M3 170,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
Bh 85,000.00
Bh 6,000.00
Bh 8,000.00
Bj 4,500.00
Bj 6,500.00
Bh 1,500,000.00
Bh 1,000,000.00
Kg 40,000.00
Kg 70,500.00
Kg 29,000.00
Kg 43,600.00
Kg 30,000.00
Ltr 60,000.00
Kg 35,200.00
Kg 59,000.00
Ltr 55,500.00
Lbr 4,100.00
Bh 16,800.00
Kg 12,000.00
Kg 35,500.00
Lbr 45,100.00
Lbr 110,000.00
Lbr 80,000.00
M1 18,500.00
M1 17,000.00
Lbr 85,000.00
Lbr 120,000.00
Liter 10,000.00
Bh 31,000.00
Bh 31,000.00
Bh 31,000.00
Unit 10,000,000.00
Unit 7,500,000.00
Unit 3,000,000.00
M1 90,000.00
M1 25,000.00
M2 65,000.00
M1 3,000.00
Titik 215,575.00
Bh 500,000.00
Bh 250,000.00
Bh 100,000.00
Bh 100,000.00
Bh 750,000.00
Bh 95,000.00
Bh 20,000.00
Bh 20,000.00
Bh 20,000.00
Bh 4,500,000.00
Bh 250,000.00
Unit 150,000,000.00
Bj 20,000.00
Bj 24,200.00
Bj 53,900.00
Bj 35,000.00
Ps 15,000.00
Bj 145,200.00
Bj 100,000.00
Bj 125,000.00
Bh 300,000.00
M1 100,000.00
Bh 1,000,000.00
Bh 450,000.00
Bh 275,000.00
Bh 600,000.00
Bh 650,000.00
Bh 800,000.00
Bh 225,000.00
Bh 200,000.00
Bh 150,000.00
Bh 250,000.00
Bh 150,000.00
Unit 2,000,000.00
Unit 1,000,000.00
Unit 50,000.00
M1 25,000.00
M1 25,000.00
M1 125,000.00
M1 100,000.00
M1 250,000.00
M1 15,000.00
M1 250,000.00
Kg 30,000.00
M2 90,000.00
M2 200,000.00
M1 5,000.00
M1 18,150.00
M1 10,000.00
M1 8,750.00
M2 29,000.00
Kg 8,000.00
Bh 1,500.00
Tube 25,000.00
Ltr 20.00
Unit 1,500,000.00
Buah 1,900,000.00
Set 9,310,000.00
m 71,160.00
m 116,807.00
m 28,500.00
m 249,500.00
Perhari 85,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 75,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00
I NENGAH ASTRAWAN
DIREKTUR
DAFTAR ANALISA
### #REF!
### #REF!
### #REF!
NO. URAIAN
SATUAN
1 2 3
I. PEKERJAAN PERSIAPAN
1 1 M' Pengukuran & pemasangan bouwplank.
0.0120 M³ Kayu usuk 4/6 klas III 2,300,000.00
0.0200 Kg. Paku biasa 2"-5" 12,000.00
0.0070 M³ Kayu papan 3/20 klas III 4,500,000.00
0.1000 Oh Tukang kayu 75,000.00
0.1000 Oh Pekerja 55,000.00
0.0100 Oh Kepala tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
2 1 M² Membersihkan lapangan dan peralatan.
0.1000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
3 1 M³ Bongkaran beton bertulang.
6.6670 Oh Pekerja 55,000.00
0.3330 Oh Mandor 81,000.00
Total :
4 1 M³ Bongkaran Dinding Tembok Bata Merah
6.6670 Oh Pekerja 55,000.00
0.0330 Oh Mandor 81,000.00
Total :
II. PEKERJAAN TANAH
1. 1 M³ Galian tanah biasa
0.4000 Oh Pekerja 55,000.00
0.0400 Oh Mandor 81,000.00
Total :
2 1 M³ Galian tanah keras
1.0000 Oh Pekerja 55,000.00
0.0320 Oh Mandor 81,000.00
Total :
3 1 M³ Urug Tanah dengan Pemadatan
1.2000 M3 Tanah Urug 100,000.00
0.5000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
4 1 M³ Pemadatan tanah.
0.5000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
5 1 M³ Urugan pasir.
1.2000 M³ Pasir Urug 150,000.00
0.3000 Hr. Pekerja 55,000.00
0.0100 Hr. Mandor 81,000.00
Total :
6 1 M³ Urugan kembali
0.1920 Oh Pekerja 55,000.00
0.0190 Oh Mandor 81,000.00
Total :
7 1 M³ Membuang tanah
0.3300 Oh Pekerja 55,000.00
0.0100 Oh Mandor 81,000.00
Total :
III. PEKERJAAN PONDASI
1 1 M³ Pasang pondasi batu kali 1 Pc : 2 Ps
1.1000 M³ Batu belah 15/20 cm 180,000.00
267.0000 Kg. Semen Portland 1,300.00
0.4270 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
2 1 M³ Pasang pondasi batu kali 1 Pc : 3 Ps
1.1000 M³ Batu belah 15/20 cm 180,000.00
202.0000 Kg. Semen Portland 1,300.00
0.4850 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
3 1 M³ Pasang pondasi batu kali 1 Pc : 5 Ps
1.2000 M³ Batu belah 15/20 cm 180,000.00
136.0000 Kg. Semen Portland 1,300.00
0.5440 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
4 1 M³ Pasangan pondasi batu kosong.
1.2000 M³ Batu bulat 15/20 cm 180,000.00
0.4320 M³ Pasir urug 150,000.00
0.7800 Oh Pekerja 55,000.00
0.3900 Oh Tukang Batu 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.0390 Oh Kepala Tukang 75,000.00
0.0390 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
IV PEKERJAAN BETON
1 1 M³ Membuat Beton Mutu fc = 7,4 Mpa (K100), Slump (12 ± 2 )cm,w/c = 0,87
247.0000 Kg. Semen portland 1,300.00
869.0000 Kg Pasir beton 100.71
999.0000 Kg Koral beton 92.59
215.0000 Lt Air 20.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
2 1 M³ Membuat Beton Mutu fc = 12,2 Mpa (K150), Slump (12 ± 2 )cm,w/c = 0,72
299.0000 Kg. Semen portland 1,300.00
799.0000 Kg Pasir beton 100.71
1017.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
3 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K200), Slump (12 ± 2 )cm,w/c = 0,61
352.0000 Kg. Semen portland 1,300.00
731.0000 Kg Pasir beton 100.71
1031.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
4 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K300), Slump (12 ± 2 )cm,w/c = 0,52
413.0000 Kg. Semen portland 1,300.00
681.0000 Kg Pasir beton 100.71
1021.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
6 1 M³ Membuat Beton Rabat
1 Pc : 3Ps : 5 Krl.
0.9100 M³ Krikil 175,000.00
0.5400 M³ Pasir beton 175,000.00
152.0000 Kg. Semen portland 1,300.00
NO. URAIAN
SATUAN
1 2 3
1.6500 Oh Pekerja 55,000.00
0.0800 Oh Mandor 81,000.00
0.2500 Oh Tukang batu 75,000.00
0.0250 Oh Kepala Tukang 75,000.00
Total :
7 Pembesian 10 Kg dengan Besi Polos / Ulir
10.5000 M3 Besi Beton Polos 7,000.00
0.1500 Kg Kawat Beton 17,500.00
0.0700 Oh Pekerja 55,000.00
0.0700 Oh Tukang Besi 75,000.00
0.0070 Oh Kepala Tukang 75,000.00
0.0040 Oh Mandor 81,000.00
Total
1 KG DENGAN BESI POLOS ATAU BESI ULIR
8 1 M2 Pasang Bekisting untuk Pondasi
0.0400 M3 Kayu klas III 1,500,000.00
0.3000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1000 Ltr Minyak bekisting 10,000.00
0.5200 Oh Pekerja 55,000.00
0.2600 Oh Tukang kayu 75,000.00
0.0260 Oh Kepala Tukang 75,000.00
0.0260 Oh Mandor 81,000.00
Total
9 1 M2 Pasang Bekisting untuk Sloof
0.0400 M3 Kayu klas III 1,500,000.00
0.3000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1000 Ltr Minyak bekisting 10,000.00
0.5200 Oh Pekerja 55,000.00
0.2600 Oh Tukang kayu 75,000.00
0.0260 Oh Kepala Tukang 75,000.00
0.0260 Oh Mandor 81,000.00
Total
10 1 M2 Pasang Bekisting untuk Kolom
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
11 1 M2 Pasang Bekisting untuk Balok
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0180 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
12 1 M2 Pasang Bekisting untuk Lantai
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
6.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
13 1 M2 Pasang Bekisting untuk Tangga
0.0300 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1500 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
14 1 M3 Membuat beton bertulang (150 Kg besi + bekesting)
0.2000 M3 Kayu klas III 1,500,000.00
1.5000 Kg Paku biasa 5' - 12 ' 12,000.00
0.4000 Ltr Minyak bekisting 10,000.00
157.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
5.3000 Oh Pekerja 55,000.00
NO. URAIAN
SATUAN
1 2 3
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2620 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
15 1 M3 Membuat Sloof beton bertulang (200 Kg besi + bekesting)
0.2700 M3 Kayu klas III 1,500,000.00
2.0000 Kg Paku biasa 5' - 12 ' 12,000.00
0.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
5.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.5600 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3230 Oh Kepala Tukang 75,000.00
0.2830 Oh Mandor 81,000.00
Total
16 1 M3 Membuat Kolom beton bertulang (300 Kg besi + bekesting)
0.4000 M3 Kayu klas III 1,500,000.00
4.0000 Kg Paku biasa 5' - 12 ' 12,000.00
2.0000 Ltr Minyak bekisting 10,000.00
315.0000 Kg Besi beton polos 7,000.00
4.5000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1500 M3 Kayu klas II balok 5,000,000.00
3.5000 Lbr Plywood tebal 9 mm 120,000.00
20.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
7.0500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
2.1000 Oh Tukang besi 75,000.00
0.4030 Oh Kepala Tukang 75,000.00
0.3530 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
17 1 M3 Membuat Plat Lantai beton bertulang (100 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
110.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
18 1 M3 Membuat Plat Lantai beton bertulang (200 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
19 1 M3 Membuat Plat Lantai beton bertulang (150 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
157.5000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
NO. URAIAN
SATUAN
1 2 3
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
20 1 M3 Membuat Balok beton bertulang (200 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1400 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
16.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
6.3500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3330 Oh Kepala Tukang 75,000.00
0.3180 Oh Mandor 81,000.00
Total
21 1 M3 Membuat tangga beton bertulang (200 Kg besi + bekesting)
0.2500 M3 Kayu klas III 1,500,000.00
3.0000 Kg Paku biasa 5' - 12 ' 12,000.00
1.2000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1050 M3 Kayu klas II balok 5,000,000.00
2.5000 Lbr Plywood tebal 9 mm 120,000.00
14.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
6.3500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.3330 Oh Kepala Tukang 75,000.00
0.3180 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
22 1 M3 Membuat dinding beton bertulang (200 Kg besi + bekesting)
0.2400 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.2000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1050 M3 Kayu klas II balok 5,000,000.00
2.5000 Lbr Plywood tebal 9 mm 120,000.00
14.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.5600 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3230 Oh Kepala Tukang 75,000.00
0.2830 Oh Mandor 81,000.00
Total
23 1 M1 Membuat kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu klas III 1,500,000.00
0.0100 Kg Paku biasa 5' - 12 ' 12,000.00
3.0000 Kg Besi beton polos 7,000.00
0.0450 Kg Kawat Beton 17,500.00
4.0000 Kg Semen portland 1,300.00
0.0060 M3 Pasir beton 175,000.00
0.0090 M3 Koral beton 175,000.00
0.1800 Oh Pekerja 55,000.00
0.0200 Oh Tukang batu 75,000.00
0.0200 Oh Tukang kayu 75,000.00
0.0200 Oh Tukang besi 75,000.00
0.0060 Oh Kepala Tukang 75,000.00
0.0090 Oh Mandor 81,000.00
Total
24 1 M1 Membuat ring balok beton bertulang (10 x 15) cm
0.0030 M3 Kayu klas III 1,500,000.00
0.0200 Kg Paku biasa 5' - 12 ' 12,000.00
3.6000 Kg Besi beton polos 7,000.00
0.0500 Kg Kawat Beton 17,500.00
5.5000 Kg Semen portland 1,300.00
0.0090 M3 Pasir beton 175,000.00
0.0150 M3 Koral beton 175,000.00
0.2970 Oh Pekerja 55,000.00
0.0330 Oh Tukang batu 75,000.00
0.0330 Oh Tukang kayu 75,000.00
0.0330 Oh Tukang besi 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total
V. PEKERJAAN DINDING
1. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 2Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
18.9500 Kg. Semen Portland 1,300.00
0.0380 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
2. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 3Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
14.3700 Kg. Semen Portland 1,300.00
0.0400 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
3. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 5Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
9.6800 Kg. Semen Portland 1,300.00
0.0450 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
4. 1 M² Pas. Batu Dinding Random
1.1000 M2 Batu Palimanan 140,000.00
11.7500 Kg. Semen Portland 1,300.00
0.0350 M³ Pasir pasangan 175,000.00
0.2700 Oh Pekerja 55,000.00
0.1350 Oh Tukang Batu 75,000.00
0.0135 Oh Kepala Tukang 75,000.00
0.0135 Oh Mandor 81,000.00
Total :
5. 1 M² Pas. Batako
12.5000 Bh. Batako 2,700.00
7.5000 Kg. Semen Portland 1,300.00
0.0270 M³ Pasir pasangan 175,000.00
1.9500 Kg. Besi Beton 8 mm 7,000.00
0.3200 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
VI. PEKERJAAN LANTAI
1 1M2 Pas. Keramik Lantai 80 x 80
1.560 Bh Keramik 80 x 80 125,000.00
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.620 Oh Pekerja 55,000.00
Total :
2 1M2 Pas. Keramik Tangga 40 x 40
6.250 Bh Keramik 40 x 40 31,200.00
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
3 1M2 Pas. Keramik Lantai 60 x 60 WC Anti Slip
2.770 Bh Keramik 60 x 60 70,397.11
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
4 1M2 Pas. Keramik Dinding 30 x 60 WC
5.550 Bh Keramik 30 x 60 35,135.14
9.300 Kg Semen 1,300.00
0.018 M3 Pasir pasangan 175,000.00
0.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.045 Oh Kepala Tukang Batu 75,000.00
0.450 Oh Tukang batu 75,000.00
0.600 Oh Pekerja 55,000.00
Total :
5 1M2 Pas. Keramik Meja Wastafel 60 x 60
2.770 Bh Keramik 60 x 60 70,397.11
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
6 1M2 Pas. Plin Keramik 10 x 80 cm
1.250 Bh Keramik 80 x 80 6,000.00
1.140 Kg Semen 1,300.00
0.003 M3 Pasir pasangan 175,000.00
0.100 Kg Semen warna 13,000.00
0.005 Oh Mandor 81,000.00
0.009 Oh Kepala Tukang Batu 75,000.00
0.090 Oh Tukang batu 75,000.00
0.090 Oh Pekerja 55,000.00
Total :
7 1M2 Pas. Granit Star Black 60 x 60 WC
2.770 Bh Granit Star Black 60 x 60 85,000.00
9.300 Kg Semen 1,300.00
0.018 M3 Pasir pasangan 175,000.00
0.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.045 Oh Kepala Tukang Batu 75,000.00
0.450 Oh Tukang batu 75,000.00
0.600 Oh Pekerja 55,000.00
Total :
VII. PEKERJAAN PLESTERAN
1. 1 M² Plesteran 1 Pc : 2 Ps, tebal 15 mm
10.2240 Kg. Semen Portland 1,300.00
0.0200 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
2. 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm
7.7760 Kg. Semen Portland 1,300.00
0.0230 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
3. 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm
5.1840 Kg. Semen Portland 1,300.00
0.0260 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
4. 1 M². Pekerjaan Acian dgn Semen
NO. URAIAN
SATUAN
1 2 3
3.2500 Kg Semen Portland 1,300.00
0.2000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Cat 68,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
5. 1 M2. Pekerjaan Waterfrofing
1.0000 Kg. Masterseal 440 35,500.00
0.0100 M³ Kuas 16,800.00
0.1600 Oh Pekerja 55,000.00
0.1600 Oh Tukang Cat 68,000.00
0.0160 Oh Kepala Tukang 75,000.00
0.0025 Oh Mandor 81,000.00
Total :
VIII. PEKERJAAN KAYU
1 1 M3 Pek. Kontruksi Kuda-Kuda Expose Kayu Kamper
1.2000 M3 Kayu kamper Balok 6,500,000.00
15.0000 Kg. Besi Strip / Begel 9,000.00
5.6000 Kg. Paku 12 cm 13,000.00
6.7000 Oh Pekerja 55,000.00
20.1000 Oh Tukang Kayu 75,000.00
1.2000 Oh Kepala Tukang 75,000.00
0.2000 Oh Mandor 81,000.00
Total :
2 1 M³ Pek.Kusen Pintu & Jendela Kayu Bingkirai
1.1000 M³ Kayu Bingkirai balok 6/12 10,000,000.00
1.2500 Kg Paku 13,000.00
1.0000 Kg Lem Kayu 40,000.00
7.0000 Oh Pekerja 55,000.00
21.0000 Oh Tukang Kayu 75,000.00
2.1000 Oh Kepala Tukang 75,000.00
0.3500 Oh Mandor 81,000.00
Total :
3 1 M1 Pek.Lispang 3x3x30 cm, Kayu Bingkirai
0.0145 M³ Kayu Bingkirai 10,000,000.00
0.0500 Kg Paku 2'' - 5'' 13,000.00
0.1000 Oh Pekerja 55,000.00
0.2000 Oh Tukang Kayu 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
4 1 M1 Pas. List Plapond
1.100 M' Gypzum 18,500.00
0.050 Oh Tukang kayu 75,000.00
0.005 Oh Kepala tukang kayu 75,000.00
0.050 Oh Pekerja 55,000.00
NO. URAIAN
SATUAN
1 2 3
0.003 Oh Mandor 81,000.00
NO. URAIAN
SATUAN
1 2 3
5 1 M2 Pek. Pintu Panil Kayu Bingkirai
0.0400 M³ Kayu Bingkirai papan 3/20 10,000,000.00
0.5000 Kg Lem Kayu 40,000.00
1.0000 Oh Pekerja 55,000.00
3.0000 Oh Tukang Kayu 75,000.00
0.3000 Oh Kepala Tukang 75,000.00
0.0500 Oh Mandor 81,000.00
Total :
6 1 M2 Pek. Pintu dan Jendela Kaca 5 mm Kayu Bingkirai
0.0240 M³ Kayu Bingkirai papan 3/20 10,000,000.00
1.0000 M² Kaca 5 mm Bening 90,000.00
0.3000 Kg Lem Kayu 40,000.00
0.8000 Oh Pekerja 55,000.00
2.4000 Oh Tukang Kayu 75,000.00
0.2400 Oh Kepala Tukang 75,000.00
0.0400 Oh Mandor 81,000.00
Total :
7 1 M2 Pek. Pas. Kaca Mati
1.1000 M² Kaca 5 mm Bening 90,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Kayu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0008 Oh Mandor 81,000.00
Total :
8 1 M2 Pek. Pas. Kaca Mati
1.1000 M² Kaca 12 mm Bening 200,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Kayu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0008 Oh Mandor 81,000.00
Total :
9 1 M2 Pasang Usuk 5/7 Kayu Bingkirai
0.0120 M3 Usuk Kayu Kalor 10,000,000.00
0.1500 Kg. Paku Lis 14,000.00
0.1100 Oh Pekerja 55,000.00
0.1100 Oh Tukang Kayu 75,000.00
0.0110 Oh Kepala Tukang 75,000.00
0.0055 Oh Mandor 81,000.00
Total :
10 1 M2 Pasang Reng 3/5 Kayu Bingkirai
0.0060 M3 Usuk Kayu Kalor 10,000,000.00
0.1500 Kg. Paku Lis 14,000.00
0.1100 Oh Pekerja 55,000.00
0.1100 Oh Tukang Kayu 75,000.00
0.0110 Oh Kepala Tukang 75,000.00
0.0055 Oh Mandor 81,000.00
NO. URAIAN
SATUAN
1 2 3
Total :
11 1 M2 Pasang Iga - Iga Kayu Bingkirai
0.0140 M³ Iga - Iga Kayu Kamper 5/7 Diprofil 10,000,000.00
0.1500 Kg Paku 13,000.00
0.0300 Kg Paku Lis 14,000.00
0.0500 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0020 Oh Mandor 81,000.00
Total :
12 1 M1 Pasang Pemade, Pemucu Kayu Bingkirai
1.0500 M1 Pas. Pemade dan Pemucu 6/12 Diprofil 70,000.00
0.1500 Kg Paku 13,000.00
0.0300 Kg Paku Lis 14,000.00
0.0500 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0020 Oh Mandor 81,000.00
Total :
13 1 M2 Plafond Variasi Pataka
1.1000 M2 Kayu Bingkirai 70,000.00
0.0500 Kg Paku 5'' - 7'' 13,000.00
0.5000 Oh Pekerja 55,000.00
0.5000 Oh Tukang Kayu 75,000.00
0.0500 Oh Kepala Tukang 75,000.00
0.0250 Oh Mandor 81,000.00
Total :
14 1 M1 Pas. List Kayu Profil
1.050 M' List Kayu Profil 4/5 35,000.00
0.1000 Kg Paku List 14,000.00
0.050 Oh Tukang kayu 75,000.00
0.005 Oh Kepala tukang kayu 75,000.00
0.050 Oh Pekerja 55,000.00
0.003 Oh Mandor 81,000.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
27,600.00 27,600.00
240.00 240.00
31,500.00 31,500.00
7,500.00 7,500.00
5,500.00 5,500.00
750.00 750.00
405.00 405.00
59,340.00 14,155.00 73,495.00
5,500.00 5,500.00
4,050.00 4,050.00
9,550.00 9,550.00
366,685.00 366,685.00
26,973.00 26,973.00
393,658.00 393,658.00
366,685.00 366,685.00
2,673.00 2,673.00
369,358.00 369,358.00
22,000.00 22,000.00
3,240.00 3,240.00
25,240.00 25,240.00
55,000.00 55,000.00
2,592.00 2,592.00
57,592.00 57,592.00
120,000.00 120,000.00
27,500.00 27,500.00
4,050.00 4,050.00
120,000.00 31,550.00 151,550.00
27,500.00 27,500.00
4,050.00 4,050.00
31,550.00 31,550.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
180,000.00 180,000.00
16,500.00 16,500.00
810.00 810.00
180,000.00 17,310.00 197,310.00
10,560.00 10,560.00
1,539.00 1,539.00
12,099.00 12,099.00
18,150.00 18,150.00
810.00 810.00
18,960.00 18,960.00
198,000.00 198,000.00
347,100.00 347,100.00
74,725.00 74,725.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
619,825.00 150,450.00 770,275.00
198,000.00 198,000.00
262,600.00 262,600.00
84,875.00 84,875.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
545,475.00 150,450.00 695,925.00
216,000.00 216,000.00
176,800.00 176,800.00
95,200.00 95,200.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
488,000.00 150,450.00 638,450.00
216,000.00 216,000.00
64,800.00 64,800.00
42,900.00 42,900.00
29,250.00 29,250.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
2,925.00 2,925.00
3,159.00 3,159.00
280,800.00 78,234.00 359,034.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
321,100.00 321,100.00
87,516.99 87,516.99
92,497.41 92,497.41
4,300.00 4,300.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
505,414.40 120,198.00 625,612.40
388,700.00 388,700.00
80,467.29 80,467.29
94,164.03 94,164.03
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
568,706.32 120,198.00 688,904.32
457,600.00 457,600.00
73,619.01 73,619.01
95,460.29 95,460.29
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
632,054.30 120,198.00 752,252.30
536,900.00 536,900.00
68,583.51 68,583.51
94,534.39 94,534.39
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
705,392.90 120,198.00 825,590.90
159,250.00 159,250.00
94,500.00 94,500.00
197,600.00 197,600.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
90,750.00 90,750.00
6,480.00 6,480.00
18,750.00 18,750.00
1,875.00 1,875.00
451,350.00 117,855.00 569,205.00
73,500.00 73,500.00
2,625.00 2,625.00
3,850.00 3,850.00
5,250.00 5,250.00
525.00 525.00
324.00 324.00
76,125.00 9,949.00 86,074.00
8,607.40
60,000.00 60,000.00
3,600.00 3,600.00
1,000.00 1,000.00
28,600.00 28,600.00
19,500.00 19,500.00
1,950.00 1,950.00
2,106.00 2,106.00
64,600.00 52,156.00 116,756.00
60,000.00 60,000.00
3,600.00 3,600.00
1,000.00 1,000.00
28,600.00 28,600.00
19,500.00 19,500.00
1,950.00 1,950.00
2,106.00 2,106.00
64,600.00 52,156.00 116,756.00
60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
75,000.00 75,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
333,800.00 66,198.00 399,998.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
90,000.00 90,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
348,800.00 66,198.00 414,998.00
60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
75,000.00 75,000.00
42,000.00 42,000.00
450,000.00 450,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
633,800.00 66,198.00 699,998.00
45,000.00 45,000.00
4,800.00 4,800.00
1,500.00 1,500.00
75,000.00 75,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
318,300.00 66,198.00 384,498.00
300,000.00 300,000.00
18,000.00 18,000.00
4,000.00 4,000.00
1,099,000.00 1,099,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
291,500.00 291,500.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,650.00 19,650.00
21,465.00 21,465.00
2,133,425.00 529,490.00 2,662,915.00
405,000.00 405,000.00
24,000.00 24,000.00
6,000.00 6,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
310,750.00 310,750.00
20,625.00 20,625.00
117,000.00 117,000.00
105,000.00 105,000.00
24,225.00 24,225.00
22,923.00 22,923.00
2,630,550.00 600,523.00 3,231,073.00
600,000.00 600,000.00
48,000.00 48,000.00
20,000.00 20,000.00
2,205,000.00 2,205,000.00
78,750.00 78,750.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
750,000.00 750,000.00
420,000.00 420,000.00
1,500,000.00 1,500,000.00
387,750.00 387,750.00
20,625.00 20,625.00
123,750.00 123,750.00
157,500.00 157,500.00
30,225.00 30,225.00
28,593.00 28,593.00
6,294,800.00 748,443.00 7,043,243.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
770,000.00 770,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
5,352,825.00 529,715.00 5,882,540.00
480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,470,000.00 1,470,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
6,052,825.00 529,715.00 6,582,540.00
480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,102,500.00 1,102,500.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
5,685,325.00 529,715.00 6,215,040.00
480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
700,000.00 700,000.00
336,000.00 336,000.00
1,200,000.00 1,200,000.00
349,250.00 349,250.00
20,625.00 20,625.00
123,750.00 123,750.00
105,000.00 105,000.00
24,975.00 24,975.00
25,758.00 25,758.00
4,965,950.00 649,358.00 5,615,308.00
375,000.00 375,000.00
36,000.00 36,000.00
12,000.00 12,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
525,000.00 525,000.00
300,000.00 300,000.00
1,050,000.00 1,050,000.00
349,250.00 349,250.00
20,625.00 20,625.00
123,750.00 123,750.00
105,000.00 105,000.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
24,975.00 24,975.00
25,758.00 25,758.00
4,493,550.00 649,358.00 5,142,908.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
360,000.00 360,000.00
38,400.00 38,400.00
12,000.00 12,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
525,000.00 525,000.00
300,000.00 300,000.00
1,050,000.00 1,050,000.00
310,750.00 310,750.00
20,625.00 20,625.00
117,000.00 117,000.00
105,000.00 105,000.00
24,225.00 24,225.00
22,923.00 22,923.00
4,480,950.00 600,523.00 5,081,473.00
3,000.00 3,000.00
120.00 120.00
21,000.00 21,000.00
787.50 787.50
5,200.00 5,200.00
1,050.00 1,050.00
1,575.00 1,575.00
9,900.00 9,900.00
1,500.00 1,500.00
1,500.00 1,500.00
1,500.00 1,500.00
450.00 450.00
729.00 729.00
32,732.50 15,579.00 48,311.50
4,500.00 4,500.00
240.00 240.00
25,200.00 25,200.00
875.00 875.00
7,150.00 7,150.00
1,575.00 1,575.00
2,625.00 2,625.00
16,335.00 16,335.00
2,475.00 2,475.00
2,475.00 2,475.00
2,475.00 2,475.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
750.00 750.00
1,215.00 1,215.00
42,165.00 25,725.00 67,890.00
98,700.00 98,700.00
24,635.00 24,635.00
6,650.00 6,650.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
129,985.00 25,965.00 155,950.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
98,700.00 98,700.00
18,681.00 18,681.00
7,000.00 7,000.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
124,381.00 25,965.00 150,346.00
98,700.00 98,700.00
12,584.00 12,584.00
7,875.00 7,875.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
119,159.00 25,965.00 145,124.00
154,000.00 154,000.00
15,275.00 15,275.00
6,125.00 6,125.00
14,850.00 14,850.00
10,125.00 10,125.00
1,012.50 1,012.50
1,093.50 1,093.50
175,400.00 27,081.00 202,481.00
33,750.00 33,750.00
9,750.00 9,750.00
4,725.00 4,725.00
13,650.00 13,650.00
17,600.00 17,600.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
61,875.00 27,065.00 88,940.00
195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00
195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00
195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00
195,000.00 195,000.00
12,090.00 12,090.00
3,150.00 3,150.00
6,500.00 6,500.00
2,430.00 2,430.00
3,375.00 3,375.00
33,750.00 33,750.00
33,000.00 33,000.00
216,740.00 72,555.00 289,295.00
195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
7,500.00 7,500.00
1,482.00 1,482.00
525.00 525.00
1,300.00 1,300.00
405.00 405.00
675.00 675.00
6,750.00 6,750.00
4,950.00 4,950.00
10,807.00 12,780.00 23,587.00
235,450.00 235,450.00
12,090.00 12,090.00
3,150.00 3,150.00
6,500.00 6,500.00
2,430.00 2,430.00
3,375.00 3,375.00
33,750.00 33,750.00
33,000.00 33,000.00
257,190.00 72,555.00 329,745.00
13,291.20 13,291.20
3,500.00 3,500.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
810.00 810.00
16,791.20 29,685.00 46,476.20
10,108.80 10,108.80
4,025.00 4,025.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
1,215.00 1,215.00
14,133.80 30,090.00 44,223.80
6,739.20 6,739.20
4,550.00 4,550.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
1,215.00 1,215.00
11,289.20 30,090.00 41,379.20
HARGA
BAHAN UPAH JUMLAH
4 5 6
4,225.00 4,225.00
11,000.00 11,000.00
6,800.00 6,800.00
750.00 750.00
810.00 810.00
4,225.00 19,360.00 23,585.00
35,500.00 35,500.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
35,668.00 21,082.50 56,750.50
7,800,000.00 7,800,000.00
135,000.00 135,000.00
72,800.00 72,800.00
368,500.00 368,500.00
1,507,500.00 1,507,500.00
90,000.00 90,000.00
16,200.00 16,200.00
8,007,800.00 1,982,200.00 9,990,000.00
11,000,000.00 11,000,000.00
16,250.00 16,250.00
40,000.00 40,000.00
385,000.00 385,000.00
1,575,000.00 1,575,000.00
157,500.00 157,500.00
28,350.00 28,350.00
11,056,250.00 2,145,850.00 13,202,100.00
145,000.00 145,000.00
650.00 650.00
5,500.00 5,500.00
15,000.00 15,000.00
1,500.00 1,500.00
405.00 405.00
145,650.00 22,405.00 168,055.00
20,350.00
3,750.00
375.00
2,750.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
243.00
20,350.00 7,118.00 27,468.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
400,000.00 400,000.00
20,000.00 20,000.00
55,000.00 55,000.00
225,000.00 225,000.00
22,500.00 22,500.00
4,050.00 4,050.00
420,000.00 306,550.00 726,550.00
240,000.00 240,000.00
90,000.00 90,000.00
12,000.00 12,000.00
44,000.00 44,000.00
180,000.00 180,000.00
18,000.00 18,000.00
3,240.00 3,240.00
342,000.00 245,240.00 587,240.00
99,000.00 99,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
64.80 64.80
99,000.00 13,264.80 112,264.80
220,000.00 220,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
64.80 64.80
220,000.00 13,264.80 233,264.80
120,000.00 120,000.00
2,100.00 2,100.00
6,050.00 6,050.00
8,250.00 8,250.00
825.00 825.00
445.50 445.50
122,100.00 15,570.50 137,670.50
60,000.00 60,000.00
2,100.00 2,100.00
6,050.00 6,050.00
8,250.00 8,250.00
825.00 825.00
445.50 445.50
HARGA
BAHAN UPAH JUMLAH
4 5 6
62,100.00 15,570.50 77,670.50
140,000.00 140,000.00
1,950.00 1,950.00
420.00 420.00
2,750.00 2,750.00
3,750.00 3,750.00
375.00 375.00
162.00 162.00
142,370.00 7,037.00 149,407.00
73,500.00 73,500.00
1,950.00 1,950.00
420.00 420.00
2,750.00 2,750.00
3,750.00 3,750.00
375.00 375.00
162.00 162.00
75,870.00 7,037.00 82,907.00
77,000.00 77,000.00
650.00 650.00
27,500.00 27,500.00
37,500.00 37,500.00
3,750.00 3,750.00
2,025.00 2,025.00
77,650.00 70,775.00 148,425.00
36,750.00 36,750.00
1,400.00 1,400.00
3,750.00
375.00
2,750.00
243.00
38,150.00 7,118.00 45,268.00
30,450.00 30,450.00
8,250.00 8,250.00
3,750.00 3,750.00
375.00 375.00
648.00 648.00
30,450.00 13,023.00 43,473.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
65,340.00 65,340.00
3,450.00 3,450.00
15,750.00 15,750.00
67,650.00 67,650.00
27,500.00 27,500.00
37,500.00 37,500.00
3,750.00 3,750.00
2,025.00 2,025.00
152,190.00 70,775.00 222,965.00
40,040.00 40,040.00
1,540.00 1,540.00
16,500.00 16,500.00
26,250.00 26,250.00
2,625.00 2,625.00
1,215.00 1,215.00
41,580.00 46,590.00 88,170.00
112,500.00 112,500.00
8,250.00 8,250.00
4,500.00 4,500.00
450.00 450.00
648.00 648.00
112,500.00 13,848.00 126,348.00
32,500.00 32,500.00
10,400.00 10,400.00
22,000.00 22,000.00
15,000.00 15,000.00
1,500.00 1,500.00
162.00 162.00
42,900.00 38,662.00 81,562.00
42,900.00 42,900.00
14,850.00 14,850.00
30,000.00 30,000.00
3,000.00 3,000.00
1,093.50 1,093.50
42,900.00 48,943.50 91,843.50
12,500.00 12,500.00
21,875.00 21,875.00
17,500.00 17,500.00
1,650.00 1,650.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
3,500.00 3,500.00
8,350.00 8,350.00
29,120.00 29,120.00
7,440.00 7,440.00
1,000.00 1,000.00
5,500.00 5,500.00
3,750.00 3,750.00
375.00 375.00
405.00 405.00
102,935.00 10,030.00 112,965.00
17,000.00 17,000.00
195.00 195.00
161,500.00 161,500.00
2,200.00 2,200.00
30,000.00 30,000.00
1,875.00 1,875.00
81.00 81.00
178,695.00 34,156.00 212,851.00
45,500.00 45,500.00
1,300.00 1,300.00
2,250.00 2,250.00
33,000.00 33,000.00
135,000.00 135,000.00
13,500.00 13,500.00
2,430.00 2,430.00
49,050.00 183,930.00 232,980.00
30,000.00 30,000.00
8,750.00 8,750.00
1,980.00 1,980.00
3,750.00 3,750.00
450.00 450.00
145.80 145.80
38,750.00 6,325.80 45,075.80
30,000.00 30,000.00
8,750.00 8,750.00
2,970.00 2,970.00
5,625.00 5,625.00
675.00 675.00
218.70 218.70
38,750.00 9,488.70 48,238.70
HARGA
BAHAN UPAH JUMLAH
4 5 6
120,000.00 120,000.00
35,000.00 35,000.00
4,455.00 4,455.00
8,437.50 8,437.50
1,012.50 1,012.50
332.10 332.10
155,000.00 14,237.10 169,237.10
HARGA
BAHAN UPAH JUMLAH
4 5 6
97,678.80
29,596.50
1,578,633.00
464,349.90
247,642.50
85,380.75
335,527.29
206,671.30
250,000.00
100,000.00
18,425.20
15,982.11
28,350.00
30,000.00
3,488,237.35
1,000,000.00 1,000,000.00
60,000.00 60,000.00
181,500.00 181,500.00
82,500.00 82,500.00
75.00 75.00
12,960.00 12,960.00
1,060,000.00 277,035.00 1,337,035.00
450,000.00 450,000.00
7,800.00 7,800.00
1,750.00 1,750.00
55,000.00 55,000.00
112,500.00 112,500.00
112,500.00 112,500.00
12,960.00 12,960.00
459,550.00 292,960.00 752,510.00
650,000.00 650,000.00
39,000.00 39,000.00
7,800.00 7,800.00
1,750.00 1,750.00
55,000.00 55,000.00
75,000.00 75,000.00
7,500.00 7,500.00
8,100.00 8,100.00
698,550.00 145,600.00 844,150.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
600,000.00 600,000.00
72,000.00 72,000.00
780.00 780.00
1,750.00 1,750.00
66,000.00 66,000.00
108,750.00 108,750.00
11,250.00 11,250.00
8,100.00 8,100.00
674,530.00 194,100.00 868,630.00
275,000.00 275,000.00
49,500.00 49,500.00
99,000.00 99,000.00
202,500.00 202,500.00
40,500.00 40,500.00
8,910.00 8,910.00
324,500.00 350,910.00 675,410.00
200,000.00 200,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
200,000.00 9,205.00 209,205.00
150,000.00 150,000.00
37.50 37.50
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
150,037.50 9,205.00 159,242.50
250,000.00 250,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
250,000.00 9,205.00 259,205.00
150,000.00 150,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
150,000.00 9,205.00 159,205.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
800,000.00
48,000.00
7,800.00
1,750.00
55,000.00
75,000.00
7,500.00
8,100.00
857,550.00 145,600.00 1,003,150.00
225,000.00
27,000.00
1,650.00
22,500.00
2,250.00
121.50
252,000.00 26,521.50 278,521.50
8,850.00 8,850.00
1,450.00 1,450.00
410.00 410.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
10,878.00 21,082.50 31,960.50
8,325.00 8,325.00
20,646.00 20,646.00
820.00 820.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
29,959.00 21,082.50 51,041.50
1,200.00 1,200.00
4,360.00 4,360.00
7,800.00 7,800.00
1,100.00 1,100.00
4,284.00 4,284.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
472.50 472.50
202.50 202.50
13,360.00 5,856.50 19,419.00
21,150.00 21,150.00
168.00 168.00
330.00 330.00
4,080.00 4,080.00
900.00 900.00
486.00 486.00
21,318.00 5,796.00 27,114.00
3,520.00 3,520.00
168.00 168.00
11,000.00 11,000.00
13,600.00 13,600.00
1,500.00 1,500.00
810.00 810.00
3,688.00 26,910.00 30,598.00
12,000.00 12,000.00
420.00 420.00
1,375.00 1,375.00
17,000.00 17,000.00
1,875.00 1,875.00
810.00 810.00
12,420.00 21,060.00 33,480.00
220,000.00 220,000.00
81,675.00 81,675.00
6,750.00 6,750.00
11,000.00 11,000.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
88,425.00 27,581.00 336,006.00
35,000.00 35,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
81.00 81.00
35,000.00 13,281.00 48,281.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
35,000.00 35,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
81.00 81.00
35,000.00 8,881.00 43,881.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
15,000.00 15,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
81.00 81.00
15,000.00 13,281.00 28,281.00
20,000.00 20,000.00
550.00 550.00
37,500.00 37,500.00
750.00 750.00
405.00 405.00
20,000.00 39,205.00 59,205.00
145,200.00 145,200.00
1,100.00 1,100.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
145,200.00 17,681.00 162,881.00
100,000.00 100,000.00
1,100.00 1,100.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
100,000.00 17,681.00 117,681.00
65,870.00 65,870.00
27,500.00 27,500.00
18,750.00 18,750.00
1,875.00 1,875.00
2,025.00 2,025.00
65,870.00 50,150.00 116,020.00
NO. URAIAN
1 2
I. PEKERJAAN PERSIAPAN
1 1 M' Pengukuran & pemasangan bouwplank.
0.0120 M³ Kayu usuk 4/6 klas III
0.0200 Kg. Paku biasa 2"-5"
0.0070 M³ Kayu papan 3/20 klas III
0.1000 Oh Tukang kayu
0.1000 Oh Pekerja
0.0100 Oh Kepala tukang
0.0050 Oh Mandor
4 1 M³ Pemadatan tanah.
0.5000 Oh Pekerja
0.0500 Oh Mandor
5 1 M³ Urugan pasir.
1.2000 M³ Pasir Urug
0.3000 Oh Pekerja
0.0100 Oh Mandor
6 1 M³ Urugan kembali
0.1333 Oh Pekerja
0.0083 Oh Mandor
7 1 M³ Membuang tanah
0.3300 Oh Pekerja
0.0100 Oh Mandor
IV PEKERJAAN BETON
1 1 M³ Membuat Beton Mutu fc = 7,4 Mpa (K100), Slump (12 ± 2 )cm,w/c = 0,87
247.0000 Kg. Semen portland
869.0000 Kg. Pasir beton
999.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor
2 1 M³ Membuat Beton Mutu fc = 12,2 Mpa (K150), Slump (12 ± 2 )cm,w/c = 0,72
299.0000 Kg. Semen portland
799.0000 Kg. Pasir beton
1017.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor
3 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K200), Slump (12 ± 2 )cm,w/c = 0,61
352.0000 Kg. Semen portland
731.0000 Kg. Pasir beton
1031.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor
4 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K300), Slump (12 ± 2 )cm,w/c = 0,52
413.0000 Kg. Semen portland
681.0000 Kg. Pasir beton
1021.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor
V. PEKERJAAN DINDING
1. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 2Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm
18.9500 Kg. Semen Portland
0.0380 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor
5 1 M² Pas. Batako
12.5000 Bh. Batako
7.5000 Kg. Semen Portland
0.0270 M³ Pasir pasangan
1.9500 Kg. Besi Beton 8 mm
0.3200 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor
VI. PEKERJAAN LANTAI
1 1M2 Pas. Keramik Lantai 80 x 80
1.560 BH Keramik 80 x 80
11.380 Kg Semen
0.042 M3 Pasir pasangan
1.500 Kg Semen warna
0.012 Oh Mandor
0.012 Oh Kepala Tukang Batu
0.120 Oh Tukang batu
0.240 Oh Pekerja
6 1 M2 Pasang Lambriziring
0.0070 M3 Papan Kayu Kamper
0.1000 Kg Paku
0.1500 Kg Paku Skrup 10 cm
0.6000 Oh Pekerja
1.8000 Oh Tukang Kayu
0.1800 Oh Kepala Tukang
0.0300 Oh Mandor
X. PEKERJAAN SANITASI
1 Memasang 1 M' pipa PVC tipe AW Ø ½" - 1 ½ "
1.2000 M1 Pipa PVC
35% harga pipa Perlengkapan
0.0360 Oh Pekerja
0.0600 Oh Tukang Pipa
0.0060 Oh Kepala Tukang
0.0018 Oh Mandor
6 Memasang 1 Buah Kloset Duduk Toto type Avante CW 821 PJ/SW 821 JP Komplit
1.0000 Bh Kloset Duduk Toto type Avante
6% Perlengkapan
3.3000 Oh Pekerja
1.1000 Oh Tukang batu
0.0010 Oh Kepala Tukang
0.1600 Oh Mandor
4 1 Bh Pasang Grendel
1.0000 Bh Grendel
0.0100 Oh Pekerja
0.5000 Oh Tukang Kayu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor
NO URAIAN PEKERJAAN
I PEKERJAAN PERALATAN UTAMA DAN PENDUKUNG
01. PERALATAN UTAMA
1. Medical Gas Manifold Oxigen (O) Harris Lokal, 2x4Cyl
2. Supporting Material
HARGA
SATUAN BAHAN UPAH JUMLAH
3 4 5 6
12 ± 2 )cm,w/c = 0,87
1,300.00 321,100.00 321,100.00
100.71 87,516.99 87,516.99
92.59 92,497.41 92,497.41
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 505,414.40 154,220.00 659,634.40
(12 ± 2 )cm,w/c = 0,72
1,300.00 388,700.00 388,700.00
100.71 80,467.29 80,467.29
92.59 94,164.03 94,164.03
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 567,631.32 154,220.00 721,851.32
(12 ± 2 )cm,w/c = 0,61
1,300.00 457,600.00 457,600.00
100.71 73,619.01 73,619.01
92.59 95,460.29 95,460.29
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 630,979.30 154,220.00 785,199.30
32,125.00 124,323.75
143,350.00 21,502.50
156,656.00 1,644,888.00
50,658.80 531,917.40
28,575.00 300,037.50
603,150.00 90,472.50
3,353,290.00 422,514.54
721,851.32 216,555.40
250,000.00 250,000.00
100,000.00 100,000.00
32,125.00 23,451.25
143,350.00 11,611.35
175,000.00 28,350.00
30,000.00 30,000.00
Total : 3,795,624.19
21 PJ/SW 821 JP Komplit
1,000,000.00 1,000,000.00 1,000,000.00
60,000.00 60,000.00 60,000.00
75,000.00 247,500.00 247,500.00
77,000.00 84,700.00 84,700.00
80,000.00 80.00 80.00
85,000.00 13,600.00 13,600.00
Total : 1,060,000.00 345,880.00 1,405,880.00
I NENGAH ASTRAWAN
DIREKTUR
7,500.000
RENCANA KERJA / TIME SCHEDULE
#REF! #REF!
#REF! #REF!
LOKASI #REF!
KONTRAK NOMOR : 71 / KNT. Bang / 2015
TANGGAL : 17 JUNI 2015
NILAI KONTRAK : 17.848.742.993,00
SPMK TGL / NOMOR : 17 JUNI 2015 / 72 / SPMK. Bang / 2015
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF!
S
#REF! #REF! P
#REF! #REF! #REF! #REF! #REF! M #REF!
K
#REF! #REF! 1
#REF! #REF! #REF! #REF! #REF! 7 #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
J
#REF! #REF! #REF! #REF! #REF! U #REF!
#REF! #REF! #REF! #REF! #REF! N #REF! #REF!
#REF! #REF! #REF! #REF! #REF! I
#REF! #REF!
2
#REF! #REF! 0
#REF! #REF! #REF! #REF! #REF! 1 #REF! #REF!
5
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
MENYETUJUI
PEJABAT PEMBUAT KOMITMEN / PPK.
LANTAI 1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
LANTAI 2
LANTAI 3
100%
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DAL
(TKDN)
Formulasi Perhitungan:
#REF!
Jasa
`
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.
Jumlah - org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 08.00 - 12.00
08.00 - 12.00
12.00 - 13.00 12.00 - 13.00
13.00 - 17.00
13.00 - 17.00 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Jumlah 37 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
- Bali
Hari : Kamis
Tanggal : 30 Juli 2015
0 m3 - Abiansemal
Dibuat oleh
- Bali
Hari : Jumat
Tanggal : 31 Juli 2015
0 m3 - Abiansemal
Dibuat oleh
- Bali
Hari : Sabtu
Tanggal : 1 Agustus 2015
0 m3 - Abiansemal
Dibuat oleh
- Bali
Hari : Minggu
Tanggal : 2 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI
0 m3 - Abiansemal
Dibuat oleh
- Bali
Hari : Senin
Tanggal : 3 Agustus 2015
0 m3 - Abiansemal
Dibuat oleh
- Bali
Hari : Selasa
Tanggal : 4 Agustus 2015
0 m3 - Abiansemal
Dibuat oleh
TANGGAL :
WAKTU
:
PELAKSANAAN
KONTRAKTOR : PT. Recta Construction
I. JAM KERJA DAN TENAGA KERJA
Tukang Kayu
Tukang Batu
Tukang Besi
Administrasi
Tukang Las
Pelaksana
Operator
Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA
1 Triplek 4 mm lbr - - - - - -
2 Usuk Kruing m3 - - - - - -
3 Paku Reng kg - - - - - -
4 Paku Usuk kg - - - - - -
5 Cat Tembok kg - - - - - -
6 Plamir kg - - - - - -
7 Cat Meni Kayu kg - - - - - -
8 Cat Finishing Kayu kg - - - - - -
9 Amplas lbr - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - -
11 Plamir Kayu kg - - - - - -
12 Dempul kayu kg - - - - - -
13 Cat meni besi kg - - - - - -
14 Cat besi tahan karat kg - - - - - -
15 Koral beton m3 - - - - - -
16 Begesting m2 - - - - - -
17 Dempul besi kg - - - - - -
18 Batu Kali m3 - - - - - -
19 Semen PC zak - - - - - -
20 Pasir pasang m3 - - - - - -
21 Besi Beton kg - - - - - -
22 Kawat Beton kg - - - - - -
23 Koral beton m3 - - - - - -
24 Pasir Cor m3 - - - - - -
25 Pagar BRC unit - - - - - -
26 Mur baut bh - - - - - -
27 Tiang frame m - - - - - -
28 Pembesian bh - - - - - -
29 Lis Kayu bh - - - - - -
Diperiksa oleh,
Dosen Pembimbing
Satuan
No Uraian Pekerjaan s/d
Tenaga Dalam
Jam Efektif Volume Bobot (%) Minggu
Kerja Minggu Ini
Lalu
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
JUMLAH -
MINGGU KE :7
TANGGAL : 29 Juli 2015
s.d. : 4 Agustus 2015
Ket.
s/d Per Bagian Tertimban
Minggu Ini Pek. (%) g (%)
-
Mahasiswa,
Jumlah 55 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Jumlah 55 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Hari : Rabu
Tanggal : 5 Agustus 2015
0 m3 #REF! Abiansemal
Dibuat oleh
s I Abiansemal
Hari : Kamis
Tanggal : 6 Agustus 2015
0 m3 #REF! Abiansemal
Dibuat oleh
s I Abiansemal
Hari : Jumat
Tanggal : 7 Agustus 2015
0 m3 #REF! Abiansemal
Dibuat oleh
s I Abiansemal
Hari : Sabtu
Tanggal : 8 Agustus 2015
s I Abiansemal
Hari : Minggu
Tanggal : 9 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI
s I Abiansemal
Hari : Senin
Tanggal : 10 Agustus 2015
s I Abiansemal
Hari : Selasa
Tanggal : 11 Agustus 2015
Tukang Kayu
Tukang Batu
Tukang Besi
Administrasi
Tukang Las
Pelaksana
Operator
Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja
1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
5 Cat Tembok kg - - - - - - -
6 Plamir kg - - - - - - -
7 Cat Meni Kayu kg - - - - - - -
8 Cat Finishing Kayu kg - - - - - - -
9 Amplas lbr - - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - - -
11 Plamir Kayu kg - - - - - - -
12 Dempul kayu kg - - - - - - -
13 Cat meni besi kg - - - - - - -
14 Cat besi tahan karat kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - 182.00 - 182.00 182.00
Diperiksa oleh,
Dosen Pembimbing
MINGGU KE
TANGGAL
Satuan
Jam No Uraian Pekerjaan s/d Minggu Dalam s/d
Volume Bobot (%)
Efektif Lalu Minggu Ini Minggu Ini
I Pekerjaan Beton
8 jam 1 Beton Rabat m3 #REF! 0.17 #REF! - #REF!
8 jam 2 Beton Bertulang Lantai Ground Tank (Fe.200 kg) m3 #REF! 0.05 #REF! - #REF!
8 jam 3 Beton Bertulang Lantai Kerja m3 #REF! 0.056 #REF! - #REF!
8 jam 4 Beton Bertulang Pondasi Plat Kaki (Fe.200 kg) m3 #REF! 2.851 #REF! - #REF!
8 jam 5 Beton Bertulang Sloof (Fe200 kg) m3 111.890 2.312 111.890 - 111.89
8 jam 6 m3 #REF! 4.336 - #REF! #REF!
8 jam 7 Beton Bertulang Kolom Praktis 1 : 2 : 3 m #REF! 0.101 - #REF! #REF!
8 Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 96.50 3.42 - - -
9 Beton Bertulang Balok Anak Lantai II (Fe.200 kg) m3 24.96 0.885 - - -
Stok 10 Beton Bertulang Balok Konsol Raam (Fe.200 kg) m3 4.68 0.165 - - -
Bahan 11 Beton Bertulang Dinding Ground Tank m3 100.28 3.706 - - -
Akhir 12 Beton Bertulang Plat Ground Tank m3 16.92 0.698 - - -
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 18.750
Ket.
Per Bagian Tertimban
Pek. (%) g (%)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
100.0 2.312
#REF! #REF!
#REF! #REF!
- -
- -
- -
- -
- -
#REF!
Dibuat oleh,
Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Hari : Rabu
Tanggal : 12 Agustus 2015
s I Abiansemal
Hari : Kamis
Tanggal : 13 Agustus 2015
s I Abiansemal
Hari : Jumat
Tanggal : 14 Agustus 2015
s I Abiansemal
Hari : Sabtu
Tanggal : 15 Agustus 2015
s I Abiansemal
Hari : Minggu
Tanggal : 16 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI
s I Abiansemal
Hari : Senin
Tanggal : 17 Agustus 2015
s I Abiansemal
Hari : Selasa
Tanggal : 18 Agustus 2015
Tukang Kayu
Tukang Batu
Tukang Besi
Administrasi
Tukang Las
Pelaksana
Operator
Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja
1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
5 Cat Tembok kg - - - - - - -
6 Plamir kg - - - - - - -
7 Cat Meni Kayu kg - - - - - - -
8 Cat Finishing Kayu kg - - - - - - -
9 Amplas lbr - - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - - -
11 Plamir Kayu kg - - - - - - -
12 Dempul kayu kg - - - - - - -
13 Cat meni besi kg - - - - - - -
14 Cat besi tahan karat kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - 182.00 - 182.00 182.00
Diperiksa oleh,
Dosen Pembimbing
MINGGU KE
TANGGAL
Satuan
Jam No Uraian Pekerjaan s/d Minggu Dalam s/d
Volume Bobot (%)
Efektif Lalu Minggu Ini Minggu Ini
I Pekerjaan Beton
8 jam 1 Beton Rabat m3 #REF! 0.17 #REF! - #REF!
8 jam 2 Beton Bertulang Lantai Ground Tank (Fe.200 kg) m3 #REF! 0.05 #REF! - #REF!
8 jam 3 Beton Bertulang Lantai Kerja m3 #REF! 0.056 #REF! - #REF!
8 jam 4 Beton Bertulang Pondasi Plat Kaki (Fe.200 kg) m3 #REF! 2.851 #REF! - #REF!
8 jam 5 Beton Bertulang Sloof (Fe200 kg) m3 111.890 2.312 111.890 - 111.89
8 jam 6 Beton Bertulang Kolom (Fe.300 kg) m3 #REF! 4.336 #REF! - #REF!
8 jam 7 Beton Bertulang Kolom Praktis 1 : 2 : 3 m #REF! 0.101 #REF! - #REF!
8 Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 96.50 3.42 - 96.500 96.50
9 Beton Bertulang Balok Anak Lantai II (Fe.200 kg) m3 24.96 0.885 - 24.960 24.96
Stok 10 Beton Bertulang Balok Konsol Raam (Fe.200 kg) m3 4.68 0.165 - 4.680 4.68
Bahan 11 Beton Bertulang Dinding Ground Tank m3 2.40 0.154 - 2.400 2.40
Akhir 12 Beton Bertulang Plat Ground Tank m3 4.80 0.094 - 4.800 4.80
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 14.594
Ket.
Per Bagian Tertimban
Pek. (%) g (%)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
100.0 2.312
#REF! #REF!
#REF! #REF!
100.0 3.420
100.0 0.885
100.0 0.165
100.0 0.154
100.0 0.094
#REF!
Dibuat oleh,
Dipriksa oleh,
Dosen Pembimbing
Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Dipriksa oleh,
Dosen Pembimbing
Hari : Rabu
Tanggal : 19 Agustus 2015
s I Abiansemal
Hari : Kamis
Tanggal : 20 Agustus 2015
s I Abiansemal
Hari : Jumat
Tanggal : 21 Agustus 2015
s I Abiansemal
Hari : Sabtu
Tanggal : 22 Agustus 2015
s I Abiansemal
Hari : Minggu
Tanggal : 23 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI
s I Abiansemal
Hari : Senin
Tanggal : 24 Agustus 2015
s I Abiansemal
Hari : Selasa
Tanggal : 25 Agustus 2015
Tukang Kayu
Tukang Batu
Tukang Besi
Administrasi
Tukang Las
Pelaksana
Operator
Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja
1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - - - - -
Diperiksa oleh,
Dosen Pembimbing
MINGGU KE
TANGGAL
Satuan
No Uraian Pekerjaan s/d
Jam Dalam s/d Minggu
Volume Bobot (%) Minggu
Efektif Minggu Ini Ini
Lalu
I Pekerjaan Beton
8 jam 1 #REF! #REF! #REF! #REF! #REF! #REF!
8 jam 2 #REF! M2 #REF! #REF! #REF! #REF!
8 jam 3 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 4 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 5 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 6 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 7 #REF! m #REF! #REF! #REF! #REF!
8 #REF! m3 #REF! #REF! #REF! #REF!
Stok
Bahan
Akhir
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH #REF!
Ket.
Per Bagian Tertimban
Pek. (%) g (%)
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!