Anda di halaman 1dari 286

DAFTAR HARGA SATUAN BAHAN DAN UPAH

#REF! #REF!
#REF! #REF!
#REF! #REF!

NO URAIAN

1 2
I HARGA BAHAN/MATERIAL
1 Tanah Urug
2 Pasir Urug
3 Pasir Beton
4 Pasir Pasangan
5 Koral Beton
6 Paving Stone (T = 6 cm) Abu - Abu
7 Paving Stone (T = 6 cm) Warna
8 Paving Stone (T = 8 cm) Abu - Abu
9 Paving Stone (T = 8 cm) Warna
10 Paving Stone 20x20 (T = 10 cm) K350
11 Batu Belah 15/20 Cm
12 Batu Bata Pasangan
13 Batu Palimanan
14 Batako
15 Batu Sikat Hitam
16 Batu Sikat Warna
17 Semen 50 Kg (Gresik)
18 Semen (Gresik)
19 Semen Warna
20 Besi Beton
21 Kawat Beton
22 Kawat 4mm
23 Besi Strip / Begel
24 Paku
25 Paku Lis
26 Paku 12 cm
27 Paku sekrup
28 Paku Beton
29 Kayu Bingkarai 6/12
30 Kayu Bingkarai Balok
31 Kayu Bingkarai Papan 3/20
32 Kayu Meranti Usuk 5/7
33 Kayu Begesting
34 Kayu Meranti Usuk 4/6
35 Kayu Kamper Balok
36 Kayu Kamper Usuk
37 Kayu Kamper Papan
38 Kayu Meranti Papan
39 Kayu Balok Klas II
40 Kayu Kamper di Profil
Kayu Papan Kruing
41 Kanstin Segilima K 225
42 Dolken kayu 8 " - 10 '/4 m
43 Koral Beton
44 Keramik Lantai 80 x 80 Cm Nero Granito
45 Keramik Tangga 40 x 40 Cm Nero Granito
46 Keramik Lantai WC 60 x 60 Cm Nero Granito Anti Slip
47 Keramik Dinding WC 30 x 60 Cm Nero Granito
48 Keramik Meja Wastafel 60 x 60 Cm Nero Granito
49 Keramik Granit Star Black 60x60 WC
50 Keramik Plin
51 Ubin Pemandu Tuna Netra Kuning
52 Genteng Kodok Karang Pilang
53 Bubungan
54 Mudra Fiber
55 Ikut Celedu Fiber
56 Lem Kayu
57 Cat Besi
58 Dempul
59 Cat Dasar
60 Cat Penutup 2 x
61 Cat Pelapis
62 Cat Anti Air
63 Vernis
64 Polituran
65 Amplas
66 Kuas
67 Plamur
68 Masterseal 440
69 Akustik 60 cm x 120 cm
70 Teakwood 3 mm
71 Gypzum
72 List Palfond Gypzum
Karet Talang
73 Kalsibord 4 mm
74 Multipeks 9 mm
75 Minyak Bekesting
76 Saklar Tunggal
77 Saklar Ganda
78 Stop Kontak
79 Panel MDP
80 Panel SDP
81 Penangkal Petir
82 Kabel 4 x 16 mm
83 Kabel 4 x 4 mm
84 Kabel 2 x 16 mm
85 Kabel 2 x 2,5 mm
86 Titik Lampu
87 Lampu RMI SK -PREMIUM T8 (2 X 36 W)EBC - 54
88 Lampu TL RM ALML 2 x 36 Watt
89 Lampu Down Light SK-401-2K-ADJ
90 Lampu Down Light SL 20 Watt
91 Lampu Gantung
92 Lampu Spot Light 20 Watt
93 Saklar Tunggal
94 Saklar Ganda
95 Stop Kontak
96 AC daikin 2 PK
97 MCB
98 Genzet Perkim 100.000 Watt
99 Grendel Pintu
100 Grendel Jendela
101 Engsel Jendela
102 Engsel Pintu Kupu-Kupu
103 Kait Angin Jendela
104 Kunci Pintu Yalle
105 Kunci Pintu Yuri
106 Kunci Slot
107 Door Closer
108 Bemper Goat
109 Kloset Duduk Toto Type Avante VW 821 J"/SW 821 JP
110 Kloset Jongkok
111 Bak Mandi Fiberglass
112 Wastafel Komplit Top Counter Toto Type Cerabo LW
113 Urinoir Toto U 57 M Bodi
114 Partisi Urinoir A 100
115 Bak Sink (Ex Royal)
116 Floor Drain Toto Type Tx 1 Bv 1 "Square Flange"
117 Kran Air Toto T 205 LCSC
118 Jet Spray
119 Shower Spray
120 Pompa Air 250 Watt
121 Profil Tank 1000 Liter
122 Exhause Fan
123 Pipa PVC AW Ø 1,5 "
124 Pipa PVC AW Ø 2 "
125 Pipa PVC AW Ø 3 "
126 Pipa PVC AW Ø 4 "
127 Pipa Galpanis Ø 1 "
128 Ramset
129 Reling Stainles Steel 2,5 "
130 Ijuk
131 Kaca Bening 55mm
132 Kaca Bening 12mm
133 Siku (Engel)
134 Profil Aluminium "T"
135 Rangka Aluminium Primer 4/4
136 Rangka Aluminium Sekunder 2/4
137 Aluminium Foil
138 Cornice
139 Seal tape
140 Sealant
141 Air
142 Medical Gas Manifold Oxigen (O) Harris Lokal, 2x4Cyl
143 Medical wall Outlet Oxygen (O), pin index, push type
144 Area alarm 1 gas (O)
Pipa Tembaga ASTM B 819 Type L
145 Diameter 3/8"
146 Diameter 1/2"
147 Diameter 5/8"
148 Diameter 3/4"
II UPAH PEKERJA
1 Mandor
2 Kepala Tukang Batu
3 Kepala Tukang Besi
4 Kepala Tukang Kayu
5 Kepala Tukang Cat
6 Pekerja
7 Tukang Batu
8 Tukang Besi
9 Tukang Kayu
10 Tukang Cat
11 Tukang Pipa
AN BAHAN DAN UPAH

HARGA SATUAN
SATUAN
(Rp)
3 4

M3 100,000.00
M3 150,000.00
M3 175,000.00
M3 175,000.00
M3 175,000.00
M2 75,000.00
M3 75,000.00
M2 75,000.00
M3 78,000.00
M3 65,870.00
M3 180,000.00
Bj 1,410.00
M2 140,000.00
Bj 2,700.00
M2 150,000.00
M2 175,000.00
Zak 68,000.00
Kg 1,300.00
Kg 13,000.00
Kg 7,000.00
Kg 17,500.00
Kg 23,000.00
Kg 9,000.00
Kg 12,000.00
Kg 14,000.00
Kg 13,000.00
Kg 15,000.00
Kg 35,000.00
M1 70,000.00
M3 10,000,000.00
M3 10,000,000.00
M3 2,300,000.00
M3 1,500,000.00
M3 2,300,000.00
M3 6,500,000.00
M3 6,500,000.00
M3 6,500,000.00
M3 4,500,000.00
M3 5,000,000.00
M1 35,000.00
M3 6,500,000.00
M1 100,000.00
Btg 75,000.00
M3 170,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
M2 195,000.00
Bh 85,000.00
Bh 6,000.00
Bh 8,000.00
Bj 4,500.00
Bj 6,500.00
Bh 1,500,000.00
Bh 1,000,000.00
Kg 40,000.00
Kg 70,500.00
Kg 29,000.00
Kg 43,600.00
Kg 30,000.00
Ltr 60,000.00
Kg 35,200.00
Kg 59,000.00
Ltr 55,500.00
Lbr 4,100.00
Bh 16,800.00
Kg 12,000.00
Kg 35,500.00
Lbr 45,100.00
Lbr 110,000.00
Lbr 80,000.00
M1 18,500.00
M1 17,000.00
Lbr 85,000.00
Lbr 120,000.00
Liter 10,000.00
Bh 31,000.00
Bh 31,000.00
Bh 31,000.00
Unit 10,000,000.00
Unit 7,500,000.00
Unit 3,000,000.00
M1 90,000.00
M1 25,000.00
M2 65,000.00
M1 3,000.00
Titik 215,575.00
Bh 500,000.00
Bh 250,000.00
Bh 100,000.00
Bh 100,000.00
Bh 750,000.00
Bh 95,000.00
Bh 20,000.00
Bh 20,000.00
Bh 20,000.00
Bh 4,500,000.00
Bh 250,000.00
Unit 150,000,000.00
Bj 20,000.00
Bj 24,200.00
Bj 53,900.00
Bj 35,000.00
Ps 15,000.00
Bj 145,200.00
Bj 100,000.00
Bj 125,000.00
Bh 300,000.00
M1 100,000.00
Bh 1,000,000.00
Bh 450,000.00
Bh 275,000.00
Bh 600,000.00
Bh 650,000.00
Bh 800,000.00
Bh 225,000.00
Bh 200,000.00
Bh 150,000.00
Bh 250,000.00
Bh 150,000.00
Unit 2,000,000.00
Unit 1,000,000.00
Unit 50,000.00
M1 25,000.00
M1 25,000.00
M1 125,000.00
M1 100,000.00
M1 250,000.00
M1 15,000.00
M1 250,000.00
Kg 30,000.00
M2 90,000.00
M2 200,000.00
M1 5,000.00
M1 18,150.00
M1 10,000.00
M1 8,750.00
M2 29,000.00
Kg 8,000.00
Bh 1,500.00
Tube 25,000.00
Ltr 20.00
Unit 1,500,000.00
Buah 1,900,000.00
Set 9,310,000.00

m 71,160.00
m 116,807.00
m 28,500.00
m 249,500.00
Perhari 85,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 80,000.00
Perhari 75,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00
Perhari 77,000.00

Amlapura, 7 Mei 2015


Kontraktor,
PT. ASRI CIPTA NATHA ALAM

I NENGAH ASTRAWAN
DIREKTUR
DAFTAR ANALISA
### #REF!
### #REF!
### #REF!

NO. URAIAN
SATUAN
1 2 3
I. PEKERJAAN PERSIAPAN
1 1 M' Pengukuran & pemasangan bouwplank.
0.0120 M³ Kayu usuk 4/6 klas III 2,300,000.00
0.0200 Kg. Paku biasa 2"-5" 12,000.00
0.0070 M³ Kayu papan 3/20 klas III 4,500,000.00
0.1000 Oh Tukang kayu 75,000.00
0.1000 Oh Pekerja 55,000.00
0.0100 Oh Kepala tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
2 1 M² Membersihkan lapangan dan peralatan.
0.1000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
3 1 M³ Bongkaran beton bertulang.
6.6670 Oh Pekerja 55,000.00
0.3330 Oh Mandor 81,000.00
Total :
4 1 M³ Bongkaran Dinding Tembok Bata Merah
6.6670 Oh Pekerja 55,000.00
0.0330 Oh Mandor 81,000.00
Total :
II. PEKERJAAN TANAH
1. 1 M³ Galian tanah biasa
0.4000 Oh Pekerja 55,000.00
0.0400 Oh Mandor 81,000.00
Total :
2 1 M³ Galian tanah keras
1.0000 Oh Pekerja 55,000.00
0.0320 Oh Mandor 81,000.00
Total :
3 1 M³ Urug Tanah dengan Pemadatan
1.2000 M3 Tanah Urug 100,000.00
0.5000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
4 1 M³ Pemadatan tanah.
0.5000 Oh Pekerja 55,000.00
0.0500 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
5 1 M³ Urugan pasir.
1.2000 M³ Pasir Urug 150,000.00
0.3000 Hr. Pekerja 55,000.00
0.0100 Hr. Mandor 81,000.00
Total :
6 1 M³ Urugan kembali
0.1920 Oh Pekerja 55,000.00
0.0190 Oh Mandor 81,000.00
Total :
7 1 M³ Membuang tanah
0.3300 Oh Pekerja 55,000.00
0.0100 Oh Mandor 81,000.00
Total :
III. PEKERJAAN PONDASI
1 1 M³ Pasang pondasi batu kali 1 Pc : 2 Ps
1.1000 M³ Batu belah 15/20 cm 180,000.00
267.0000 Kg. Semen Portland 1,300.00
0.4270 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
2 1 M³ Pasang pondasi batu kali 1 Pc : 3 Ps
1.1000 M³ Batu belah 15/20 cm 180,000.00
202.0000 Kg. Semen Portland 1,300.00
0.4850 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
3 1 M³ Pasang pondasi batu kali 1 Pc : 5 Ps
1.2000 M³ Batu belah 15/20 cm 180,000.00
136.0000 Kg. Semen Portland 1,300.00
0.5440 M³ Pasir pasangan 175,000.00
1.5000 Oh Pekerja 55,000.00
0.7500 Oh Tukang Batu 75,000.00
0.0750 Oh Kepala Tukang 75,000.00
0.0750 Oh Mandor 81,000.00
Total :
4 1 M³ Pasangan pondasi batu kosong.
1.2000 M³ Batu bulat 15/20 cm 180,000.00
0.4320 M³ Pasir urug 150,000.00
0.7800 Oh Pekerja 55,000.00
0.3900 Oh Tukang Batu 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.0390 Oh Kepala Tukang 75,000.00
0.0390 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
IV PEKERJAAN BETON
1 1 M³ Membuat Beton Mutu fc = 7,4 Mpa (K100), Slump (12 ± 2 )cm,w/c = 0,87
247.0000 Kg. Semen portland 1,300.00
869.0000 Kg Pasir beton 100.71
999.0000 Kg Koral beton 92.59
215.0000 Lt Air 20.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
2 1 M³ Membuat Beton Mutu fc = 12,2 Mpa (K150), Slump (12 ± 2 )cm,w/c = 0,72
299.0000 Kg. Semen portland 1,300.00
799.0000 Kg Pasir beton 100.71
1017.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
3 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K200), Slump (12 ± 2 )cm,w/c = 0,61
352.0000 Kg. Semen portland 1,300.00
731.0000 Kg Pasir beton 100.71
1031.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
4 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K300), Slump (12 ± 2 )cm,w/c = 0,52
413.0000 Kg. Semen portland 1,300.00
681.0000 Kg Pasir beton 100.71
1021.0000 Kg Koral beton 92.59
215.0000 Lt Air 25.00
1.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
0.0280 Oh Kepala Tukang 75,000.00
0.0830 Oh Mandor 81,000.00
Total :
6 1 M³ Membuat Beton Rabat
1 Pc : 3Ps : 5 Krl.
0.9100 M³ Krikil 175,000.00
0.5400 M³ Pasir beton 175,000.00
152.0000 Kg. Semen portland 1,300.00
NO. URAIAN
SATUAN
1 2 3
1.6500 Oh Pekerja 55,000.00
0.0800 Oh Mandor 81,000.00
0.2500 Oh Tukang batu 75,000.00
0.0250 Oh Kepala Tukang 75,000.00
Total :
7 Pembesian 10 Kg dengan Besi Polos / Ulir
10.5000 M3 Besi Beton Polos 7,000.00
0.1500 Kg Kawat Beton 17,500.00
0.0700 Oh Pekerja 55,000.00
0.0700 Oh Tukang Besi 75,000.00
0.0070 Oh Kepala Tukang 75,000.00
0.0040 Oh Mandor 81,000.00
Total
1 KG DENGAN BESI POLOS ATAU BESI ULIR
8 1 M2 Pasang Bekisting untuk Pondasi
0.0400 M3 Kayu klas III 1,500,000.00
0.3000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1000 Ltr Minyak bekisting 10,000.00
0.5200 Oh Pekerja 55,000.00
0.2600 Oh Tukang kayu 75,000.00
0.0260 Oh Kepala Tukang 75,000.00
0.0260 Oh Mandor 81,000.00
Total
9 1 M2 Pasang Bekisting untuk Sloof
0.0400 M3 Kayu klas III 1,500,000.00
0.3000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1000 Ltr Minyak bekisting 10,000.00
0.5200 Oh Pekerja 55,000.00
0.2600 Oh Tukang kayu 75,000.00
0.0260 Oh Kepala Tukang 75,000.00
0.0260 Oh Mandor 81,000.00
Total
10 1 M2 Pasang Bekisting untuk Kolom
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
11 1 M2 Pasang Bekisting untuk Balok
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0180 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
12 1 M2 Pasang Bekisting untuk Lantai
0.0400 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.2000 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
6.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
13 1 M2 Pasang Bekisting untuk Tangga
0.0300 M3 Kayu klas III 1,500,000.00
0.4000 Kg Paku biasa 5' - 10 ' 12,000.00
0.1500 Ltr Minyak bekisting 10,000.00
0.0150 M3 Balok Kayu Klas II 5,000,000.00
0.3500 Lbr Plywood tebal 9 mm 120,000.00
2.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
0.6600 Oh Pekerja 55,000.00
0.3300 Oh Tukang kayu 75,000.00
0.0330 Oh Kepala Tukang 75,000.00
0.0330 Oh Mandor 81,000.00
Total
14 1 M3 Membuat beton bertulang (150 Kg besi + bekesting)
0.2000 M3 Kayu klas III 1,500,000.00
1.5000 Kg Paku biasa 5' - 12 ' 12,000.00
0.4000 Ltr Minyak bekisting 10,000.00
157.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
5.3000 Oh Pekerja 55,000.00
NO. URAIAN
SATUAN
1 2 3
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2620 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
15 1 M3 Membuat Sloof beton bertulang (200 Kg besi + bekesting)
0.2700 M3 Kayu klas III 1,500,000.00
2.0000 Kg Paku biasa 5' - 12 ' 12,000.00
0.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
5.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.5600 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3230 Oh Kepala Tukang 75,000.00
0.2830 Oh Mandor 81,000.00
Total
16 1 M3 Membuat Kolom beton bertulang (300 Kg besi + bekesting)
0.4000 M3 Kayu klas III 1,500,000.00
4.0000 Kg Paku biasa 5' - 12 ' 12,000.00
2.0000 Ltr Minyak bekisting 10,000.00
315.0000 Kg Besi beton polos 7,000.00
4.5000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1500 M3 Kayu klas II balok 5,000,000.00
3.5000 Lbr Plywood tebal 9 mm 120,000.00
20.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
7.0500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
2.1000 Oh Tukang besi 75,000.00
0.4030 Oh Kepala Tukang 75,000.00
0.3530 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
17 1 M3 Membuat Plat Lantai beton bertulang (100 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
110.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
18 1 M3 Membuat Plat Lantai beton bertulang (200 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
19 1 M3 Membuat Plat Lantai beton bertulang (150 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
157.5000 Kg Besi beton polos 7,000.00
2.2500 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
NO. URAIAN
SATUAN
1 2 3
0.8100 M3 Koral beton 175,000.00
0.1200 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
32.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.3000 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.3000 Oh Tukang kayu 75,000.00
1.0500 Oh Tukang besi 75,000.00
0.2650 Oh Kepala Tukang 75,000.00
0.2650 Oh Mandor 81,000.00
Total
20 1 M3 Membuat Balok beton bertulang (200 Kg besi + bekesting)
0.3200 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.6000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1400 M3 Kayu klas II balok 5,000,000.00
2.8000 Lbr Plywood tebal 9 mm 120,000.00
16.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
6.3500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3330 Oh Kepala Tukang 75,000.00
0.3180 Oh Mandor 81,000.00
Total
21 1 M3 Membuat tangga beton bertulang (200 Kg besi + bekesting)
0.2500 M3 Kayu klas III 1,500,000.00
3.0000 Kg Paku biasa 5' - 12 ' 12,000.00
1.2000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1050 M3 Kayu klas II balok 5,000,000.00
2.5000 Lbr Plywood tebal 9 mm 120,000.00
14.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
6.3500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.6500 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.3330 Oh Kepala Tukang 75,000.00
0.3180 Oh Mandor 81,000.00
Total
NO. URAIAN
SATUAN
1 2 3
22 1 M3 Membuat dinding beton bertulang (200 Kg besi + bekesting)
0.2400 M3 Kayu klas III 1,500,000.00
3.2000 Kg Paku biasa 5' - 12 ' 12,000.00
1.2000 Ltr Minyak bekisting 10,000.00
210.0000 Kg Besi beton polos 7,000.00
3.0000 Kg Kawat Beton 17,500.00
336.0000 Kg Semen portland 1,300.00
0.5400 M3 Pasir beton 175,000.00
0.8100 M3 Koral beton 175,000.00
0.1050 M3 Kayu klas II balok 5,000,000.00
2.5000 Lbr Plywood tebal 9 mm 120,000.00
14.0000 Btg Dolken kayu 8 " - 10 '/4 m 75,000.00
5.6500 Oh Pekerja 55,000.00
0.2750 Oh Tukang batu 75,000.00
1.5600 Oh Tukang kayu 75,000.00
1.4000 Oh Tukang besi 75,000.00
0.3230 Oh Kepala Tukang 75,000.00
0.2830 Oh Mandor 81,000.00
Total
23 1 M1 Membuat kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu klas III 1,500,000.00
0.0100 Kg Paku biasa 5' - 12 ' 12,000.00
3.0000 Kg Besi beton polos 7,000.00
0.0450 Kg Kawat Beton 17,500.00
4.0000 Kg Semen portland 1,300.00
0.0060 M3 Pasir beton 175,000.00
0.0090 M3 Koral beton 175,000.00
0.1800 Oh Pekerja 55,000.00
0.0200 Oh Tukang batu 75,000.00
0.0200 Oh Tukang kayu 75,000.00
0.0200 Oh Tukang besi 75,000.00
0.0060 Oh Kepala Tukang 75,000.00
0.0090 Oh Mandor 81,000.00
Total
24 1 M1 Membuat ring balok beton bertulang (10 x 15) cm
0.0030 M3 Kayu klas III 1,500,000.00
0.0200 Kg Paku biasa 5' - 12 ' 12,000.00
3.6000 Kg Besi beton polos 7,000.00
0.0500 Kg Kawat Beton 17,500.00
5.5000 Kg Semen portland 1,300.00
0.0090 M3 Pasir beton 175,000.00
0.0150 M3 Koral beton 175,000.00
0.2970 Oh Pekerja 55,000.00
0.0330 Oh Tukang batu 75,000.00
0.0330 Oh Tukang kayu 75,000.00
0.0330 Oh Tukang besi 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total
V. PEKERJAAN DINDING
1. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 2Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
18.9500 Kg. Semen Portland 1,300.00
0.0380 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
2. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 3Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
14.3700 Kg. Semen Portland 1,300.00
0.0400 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
3. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 5Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm 1,410.00
9.6800 Kg. Semen Portland 1,300.00
0.0450 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
4. 1 M² Pas. Batu Dinding Random
1.1000 M2 Batu Palimanan 140,000.00
11.7500 Kg. Semen Portland 1,300.00
0.0350 M³ Pasir pasangan 175,000.00
0.2700 Oh Pekerja 55,000.00
0.1350 Oh Tukang Batu 75,000.00
0.0135 Oh Kepala Tukang 75,000.00
0.0135 Oh Mandor 81,000.00
Total :
5. 1 M² Pas. Batako
12.5000 Bh. Batako 2,700.00
7.5000 Kg. Semen Portland 1,300.00
0.0270 M³ Pasir pasangan 175,000.00
1.9500 Kg. Besi Beton 8 mm 7,000.00
0.3200 Oh Pekerja 55,000.00
0.1000 Oh Tukang Batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
VI. PEKERJAAN LANTAI
1 1M2 Pas. Keramik Lantai 80 x 80
1.560 Bh Keramik 80 x 80 125,000.00
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
NO. URAIAN
SATUAN
1 2 3
0.620 Oh Pekerja 55,000.00
Total :
2 1M2 Pas. Keramik Tangga 40 x 40
6.250 Bh Keramik 40 x 40 31,200.00
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
3 1M2 Pas. Keramik Lantai 60 x 60 WC Anti Slip
2.770 Bh Keramik 60 x 60 70,397.11
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
4 1M2 Pas. Keramik Dinding 30 x 60 WC
5.550 Bh Keramik 30 x 60 35,135.14
9.300 Kg Semen 1,300.00
0.018 M3 Pasir pasangan 175,000.00
0.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.045 Oh Kepala Tukang Batu 75,000.00
0.450 Oh Tukang batu 75,000.00
0.600 Oh Pekerja 55,000.00
Total :
5 1M2 Pas. Keramik Meja Wastafel 60 x 60
2.770 Bh Keramik 60 x 60 70,397.11
11.380 Kg Semen 1,300.00
0.042 M3 Pasir pasangan 175,000.00
1.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.035 Oh Kepala Tukang Batu 75,000.00
0.350 Oh Tukang batu 75,000.00
0.620 Oh Pekerja 55,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
6 1M2 Pas. Plin Keramik 10 x 80 cm
1.250 Bh Keramik 80 x 80 6,000.00
1.140 Kg Semen 1,300.00
0.003 M3 Pasir pasangan 175,000.00
0.100 Kg Semen warna 13,000.00
0.005 Oh Mandor 81,000.00
0.009 Oh Kepala Tukang Batu 75,000.00
0.090 Oh Tukang batu 75,000.00
0.090 Oh Pekerja 55,000.00
Total :
7 1M2 Pas. Granit Star Black 60 x 60 WC
2.770 Bh Granit Star Black 60 x 60 85,000.00
9.300 Kg Semen 1,300.00
0.018 M3 Pasir pasangan 175,000.00
0.500 Kg Semen warna 13,000.00
0.030 Oh Mandor 81,000.00
0.045 Oh Kepala Tukang Batu 75,000.00
0.450 Oh Tukang batu 75,000.00
0.600 Oh Pekerja 55,000.00
Total :
VII. PEKERJAAN PLESTERAN
1. 1 M² Plesteran 1 Pc : 2 Ps, tebal 15 mm
10.2240 Kg. Semen Portland 1,300.00
0.0200 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
2. 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm
7.7760 Kg. Semen Portland 1,300.00
0.0230 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
3. 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm
5.1840 Kg. Semen Portland 1,300.00
0.0260 M³ Pasir pasangan 175,000.00
0.3000 Oh Pekerja 55,000.00
0.1500 Oh Tukang Batu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
4. 1 M². Pekerjaan Acian dgn Semen
NO. URAIAN
SATUAN
1 2 3
3.2500 Kg Semen Portland 1,300.00
0.2000 Oh Pekerja 55,000.00
0.1000 Oh Tukang Cat 68,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
5. 1 M2. Pekerjaan Waterfrofing
1.0000 Kg. Masterseal 440 35,500.00
0.0100 M³ Kuas 16,800.00
0.1600 Oh Pekerja 55,000.00
0.1600 Oh Tukang Cat 68,000.00
0.0160 Oh Kepala Tukang 75,000.00
0.0025 Oh Mandor 81,000.00
Total :
VIII. PEKERJAAN KAYU
1 1 M3 Pek. Kontruksi Kuda-Kuda Expose Kayu Kamper
1.2000 M3 Kayu kamper Balok 6,500,000.00
15.0000 Kg. Besi Strip / Begel 9,000.00
5.6000 Kg. Paku 12 cm 13,000.00
6.7000 Oh Pekerja 55,000.00
20.1000 Oh Tukang Kayu 75,000.00
1.2000 Oh Kepala Tukang 75,000.00
0.2000 Oh Mandor 81,000.00
Total :
2 1 M³ Pek.Kusen Pintu & Jendela Kayu Bingkirai
1.1000 M³ Kayu Bingkirai balok 6/12 10,000,000.00
1.2500 Kg Paku 13,000.00
1.0000 Kg Lem Kayu 40,000.00
7.0000 Oh Pekerja 55,000.00
21.0000 Oh Tukang Kayu 75,000.00
2.1000 Oh Kepala Tukang 75,000.00
0.3500 Oh Mandor 81,000.00
Total :
3 1 M1 Pek.Lispang 3x3x30 cm, Kayu Bingkirai
0.0145 M³ Kayu Bingkirai 10,000,000.00
0.0500 Kg Paku 2'' - 5'' 13,000.00
0.1000 Oh Pekerja 55,000.00
0.2000 Oh Tukang Kayu 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
4 1 M1 Pas. List Plapond
1.100 M' Gypzum 18,500.00
0.050 Oh Tukang kayu 75,000.00
0.005 Oh Kepala tukang kayu 75,000.00
0.050 Oh Pekerja 55,000.00
NO. URAIAN
SATUAN
1 2 3
0.003 Oh Mandor 81,000.00
NO. URAIAN
SATUAN
1 2 3
5 1 M2 Pek. Pintu Panil Kayu Bingkirai
0.0400 M³ Kayu Bingkirai papan 3/20 10,000,000.00
0.5000 Kg Lem Kayu 40,000.00
1.0000 Oh Pekerja 55,000.00
3.0000 Oh Tukang Kayu 75,000.00
0.3000 Oh Kepala Tukang 75,000.00
0.0500 Oh Mandor 81,000.00
Total :
6 1 M2 Pek. Pintu dan Jendela Kaca 5 mm Kayu Bingkirai
0.0240 M³ Kayu Bingkirai papan 3/20 10,000,000.00
1.0000 M² Kaca 5 mm Bening 90,000.00
0.3000 Kg Lem Kayu 40,000.00
0.8000 Oh Pekerja 55,000.00
2.4000 Oh Tukang Kayu 75,000.00
0.2400 Oh Kepala Tukang 75,000.00
0.0400 Oh Mandor 81,000.00
Total :
7 1 M2 Pek. Pas. Kaca Mati
1.1000 M² Kaca 5 mm Bening 90,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Kayu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0008 Oh Mandor 81,000.00
Total :
8 1 M2 Pek. Pas. Kaca Mati
1.1000 M² Kaca 12 mm Bening 200,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Kayu 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0008 Oh Mandor 81,000.00
Total :
9 1 M2 Pasang Usuk 5/7 Kayu Bingkirai
0.0120 M3 Usuk Kayu Kalor 10,000,000.00
0.1500 Kg. Paku Lis 14,000.00
0.1100 Oh Pekerja 55,000.00
0.1100 Oh Tukang Kayu 75,000.00
0.0110 Oh Kepala Tukang 75,000.00
0.0055 Oh Mandor 81,000.00
Total :
10 1 M2 Pasang Reng 3/5 Kayu Bingkirai
0.0060 M3 Usuk Kayu Kalor 10,000,000.00
0.1500 Kg. Paku Lis 14,000.00
0.1100 Oh Pekerja 55,000.00
0.1100 Oh Tukang Kayu 75,000.00
0.0110 Oh Kepala Tukang 75,000.00
0.0055 Oh Mandor 81,000.00
NO. URAIAN
SATUAN
1 2 3
Total :
11 1 M2 Pasang Iga - Iga Kayu Bingkirai
0.0140 M³ Iga - Iga Kayu Kamper 5/7 Diprofil 10,000,000.00
0.1500 Kg Paku 13,000.00
0.0300 Kg Paku Lis 14,000.00
0.0500 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0020 Oh Mandor 81,000.00
Total :
12 1 M1 Pasang Pemade, Pemucu Kayu Bingkirai
1.0500 M1 Pas. Pemade dan Pemucu 6/12 Diprofil 70,000.00
0.1500 Kg Paku 13,000.00
0.0300 Kg Paku Lis 14,000.00
0.0500 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0020 Oh Mandor 81,000.00
Total :
13 1 M2 Plafond Variasi Pataka
1.1000 M2 Kayu Bingkirai 70,000.00
0.0500 Kg Paku 5'' - 7'' 13,000.00
0.5000 Oh Pekerja 55,000.00
0.5000 Oh Tukang Kayu 75,000.00
0.0500 Oh Kepala Tukang 75,000.00
0.0250 Oh Mandor 81,000.00
Total :
14 1 M1 Pas. List Kayu Profil
1.050 M' List Kayu Profil 4/5 35,000.00
0.1000 Kg Paku List 14,000.00
0.050 Oh Tukang kayu 75,000.00
0.005 Oh Kepala tukang kayu 75,000.00
0.050 Oh Pekerja 55,000.00
0.003 Oh Mandor 81,000.00

15 1 M2 Pasang Lapisan Aluminium Foil


1.0500 M2 Aluminium Foil 29,000.00
0.1500 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0080 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
16 1 M2 Pasang Langit Akustik Ukuran (60 x 120) cm + Rangka Aluminium
3.6000 M1 Profil Aluminium "T" 18,150.00
0.1500 Kg Kawat Diameter 4 mm 23,000.00
1.0500 M1 Ramset 15,000.00
1.5000 Lbr Akustik 60 cm x 120 cm 45,100.00
0.5000 Oh Pekerja 55,000.00
0.5000 Oh Tukang Besi 75,000.00
0.0500 Oh Kepala Tukang 75,000.00
0.0250 Oh Mandor 81,000.00
Total :
17 1 M2 Pasang Teak Wood
0.3640 Lbr Teak Wood 110,000.00
0.1100 Kg Paku 14,000.00
0.3000 Oh Pekerja 55,000.00
0.3500 Oh Tukang Kayu 75,000.00
0.0350 Oh Kepala Tukang 75,000.00
0.0150 Oh Mandor 81,000.00
Total :
IX. PEKERJAAN PENUTUP ATAP
1 1 M2 Pas. Atap Genteng Kodok Karang Pilang
25.0000 Bh Genteng Kodok Karang Pilang 4,500.00
0.1500 Oh Pekerja 55,000.00
0.0600 Oh Tukang Kayu 75,000.00
0.0060 Oh Kepala Tukang 75,000.00
0.0080 Oh Mandor 81,000.00
Total :
2 1 M1 Pek. Pasang Bubungan
5.0000 Bh Bubungan 6,500.00
8.0000 Kg Semen Portland 1,300.00
0.4000 Oh Pekerja 55,000.00
0.2000 Oh Tukang Kayu 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0020 Oh Mandor 81,000.00
Total :
3 1 M2 Pasang Plapond Teakwood
0.3900 Lbr Teakwood Jati 110,000.00
0.2700 Oh Pekerja 55,000.00
0.4000 Oh Tukang Kayu 75,000.00
0.0400 Oh Kepala Tukang 75,000.00
0.0135 Oh Mandor 81,000.00
Total :
4 1 M2 Pasang Plapond Gypzum 9 mm + Rangka Hollow
1.2500 M1 Rangka Aluminium Primer 4/4 10,000.00
2.5000 M1 Rangka Aluminium Sekunder 2/4 8,750.00
2.0000 M1 Rangka Penggantung 2/4 8,750.00
0.1100 Kg Paku sekrup 15,000.00
NO. URAIAN
SATUAN
1 2 3
0.1000 Kg Paku Beton 35,000.00
1.6700 M1 Siku (Engel) 5,000.00
0.3640 Lbr Gypzum 80,000.00
0.9300 Kg Cornice 8,000.00
1.0000 Ls Pleter Bord 1,000.00
0.1000 Oh Pekerja 55,000.00
0.0500 Oh Tukang Kayu 75,000.00
0.0050 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
5 1 M1 Pasang Talang Karet
1.0000 M1 Karet Talang Lbr 0.60 17,000.00
0.0150 Kg Paku 13,000.00
0.0190 M3 Kayu Papan Kruing 8,500,000.00
0.0400 Oh Pekerja 55,000.00
0.4000 Oh Tukang Besi 75,000.00
0.0250 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
6 1 M2 Pasang Lambriziring
0.0070 M3 Papan Kayu Kamper 6,500,000.00
0.1000 Kg Paku 13,000.00
0.1500 Kg Paku Skrup 10 cm 15,000.00
0.6000 Oh Pekerja 55,000.00
1.8000 Oh Tukang Kayu 75,000.00
0.1800 Oh Kepala Tukang 75,000.00
0.0300 Oh Mandor 81,000.00
Total :
X. PEKERJAAN SANITASI
1 Memasang 1 M' pipa PVC tipe AW Ø ½" - 1 ½ "
1.2000 M1 Pipa PVC 25,000.00
35%xharga pipa Perlengkapan 8,750.00
0.0360 Oh Pekerja 55,000.00
0.0600 Oh Tukang Pipa 62,500.00
0.0060 Oh Kepala Tukang 75,000.00
0.0018 Oh Mandor 81,000.00
Total :
2 Memasang 1 M' pipa PVC tipe AW Ø 2 "
1.2000 M1 Pipa PVC 25,000.00
35%xharga pipa Perlengkapan 8,750.00
0.0540 Oh Pekerja 55,000.00
0.0900 Oh Tukang Pipa 62,500.00
0.0090 Oh Kepala Tukang 75,000.00
0.0027 Oh Mandor 81,000.00
Total :
3 Memasang 1 M' pipa PVC tipe AW Ø 3 " - Ø 4"
NO. URAIAN
SATUAN
1 2 3
1.2000 M1 Pipa PVC 100,000.00
35%xharga pipa Perlengkapan 35,000.00
0.0810 Oh Pekerja 55,000.00
0.1350 Oh Tukang Pipa 62,500.00
0.0135 Oh Kepala Tukang 75,000.00
0.0041 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
4 1 Bh Septiktank dan Peresapan (L=150cm,P=200,T=150Cm)
(SEPTIKTANK)
3.8700 M3 Galian Tanah 25,240.00
0.1500 M3 Urugan Pasir t=5cm 197,310.00
10.5000 M2 Pas. Bata Merah 1 : 3 150,346.00
10.5000 M2 Plesteran 1 : 3 44,223.80
10.5000 M2 Acian Semen 23,585.00
0.1500 M3 Rabatan 1 : 3 : 5 569,205.00
0.1260 M3 Ring Balok 12/15 (Fe=180) 2,662,915.00
0.3000 M3 Plat Beton T = 10 cm 688,904.32
1.0000 M1 Pipa Hawa Galvanis 1" 250,000.00
1.0000 M1 Pipa PVC 4" 100,000.00
(PERESAPAN)
0.7300 M3 Galian Tanah 25,240.00
0.0810 M3 Urugan Pasir t=5cm 197,310.00
0.1620 M3 Kerikil Beton 175,000.00
1.0000 Kg Ijuk 30,000.00
Total :
6 Memasang 1 Buah Kloset Duduk Toto type Avante CW 821 PJ/SW 821 JP Komplit
1.0000 Bh Kloset Duduk Toto type Avante 1,000,000.00
6%xharga pipa Perlengkapan 60,000.00
3.3000 Oh Pekerja 55,000.00
1.1000 Oh Tukang batu 75,000.00
0.0010 Oh Kepala Tukang 75,000.00
0.1600 Oh Mandor 81,000.00
Total :
7 Memasang 1 Buah Kloset Jongkok
1.0000 Bh Kloset Jongkok 450,000.00
6.0000 Kg Semen Portland 1,300.00
0.0100 M3 Pasir Pasangan 175,000.00
1.0000 Oh Pekerja 55,000.00
1.5000 Oh Tukang batu 75,000.00
1.5000 Oh Kepala Tukang 75,000.00
0.1600 Oh Mandor 81,000.00
Total :
8 Memasang 1 Buah Urinoir Toto U 57 M Bodi
1.0000 Bh Urinoir 650,000.00
6%xharga pipa Perlengkapan 39,000.00
6.0000 Kg Semen Portland 1,300.00
0.0100 M3 Pasir Pasangan 175,000.00
1.0000 Oh Pekerja 55,000.00
1.0000 Oh Tukang batu 75,000.00
0.1000 Oh Kepala Tukang 75,000.00
0.1000 Oh Mandor 81,000.00
Total :
9 Memasang 1 Buah Wastafel Toto Type Cerabo LW 523"
NO. URAIAN
SATUAN
1 2 3
1.0000 Bh Wastafel 600,000.00
12%xharga pipa Perlengkapan 72,000.00
0.6000 Kg Semen Portland 1,300.00
0.0100 M3 Pasir Pasangan 175,000.00
1.2000 Oh Pekerja 55,000.00
1.4500 Oh Tukang batu 75,000.00
0.1500 Oh Kepala Tukang 75,000.00
0.1000 Oh Mandor 81,000.00
Total :
10 Memasang 1 Buah Bak Mandi (Fiber) 70 x 70 x 66 cm
1.0000 Bh Bak Mandi 275,000.00
18%xharga pipa Perlengkapan 49,500.00
1.8000 Oh Pekerja 55,000.00
2.7000 Oh Tukang batu 75,000.00
0.5400 Oh Kepala Tukang 75,000.00
0.1100 Oh Mandor 81,000.00
Total :
11 Memasang 1 Buah Floor Drain Toto Type Tx 1 Bv 1 " Square Flange"
1.0000 Bh Floor Drain 200,000.00
0.0100 Oh Pekerja 55,000.00
0.1000 Oh Tukang batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
12 Memasang 1 Buah Kran Air Toto T 205 LCSC
1.0000 Bh Kran Air 150,000.00
0.0250 Bh Seal Tape 1,500.00
0.0100 Oh Pekerja 55,000.00
0.1000 Oh Tukang batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
13 Memasang 1 Buah Jet Spray
1.0000 Bh Jet Spray 250,000.00
0.0100 Oh Pekerja 55,000.00
0.1000 Oh Tukang batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
14 Memasang 1 Buah Shower Spray
1.0000 Bh Shower Spray 150,000.00
0.0100 Oh Pekerja 55,000.00
0.1000 Oh Tukang batu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
15 Memasang 1 Buah Partisi Urinoir A 100 TOTO
1.0000 bh Urinoir 800,000.00
6% x harga urinoir Perlengkapan 48,000.00
6.0000 kg Semen Portland 1,300.00
0.0100 m3 Pasir Pasangan 175,000.00
1.0000 Oh Pekerja 55,000.00
1.0000 Oh Tukang batu 75,000.00
0.1000 Oh Kepala Tukang 75,000.00
0.1000 Oh Mandor 81,000.00
Total :
16 Memasang 1 Buah Bak Cuci Piring Stainless Steel
1.0000 Bh Bak cuci stainless steel 225,000.00
12%xharga Water drain + asesories 27,000.00
0.0300 Oh Pekerja 55,000.00
0.3000 Oh Tukang batu 75,000.00
0.0300 Oh Kepala tukang 75,000.00
0.0015 Oh Mandor 81,000.00
Total :
XI. PEKERJAAN PENGECETAN
1 1 M2 Pengecat Bidang Kayu dengan Vernis
0.1500 Kg Vernis 59,000.00
0.0500 Kg Dempul 29,000.00
0.1000 Lbr Amplas 4,100.00
0.0100 Bh Kuas 16,800.00
0.1600 Oh Pekerja 55,000.00
0.1600 Oh Tukang Cat 68,000.00
0.0160 Oh Kepala Tukang 75,000.00
0.0025 Oh Mandor 81,000.00
Total :
2 1 M2 Pelaburan Bidang Kayu dengan Polituran Ultra
0.1500 Ltr Polituran 55,500.00
0.3720 Ltr Polituran Jadi 55,500.00
0.2000 Lbr Amplas 4,100.00
0.0100 Bh Kuas 16,800.00
0.1600 Oh Pekerja 55,000.00
0.1600 Oh Tukang Cat 68,000.00
0.0160 Oh Kepala Tukang 75,000.00
0.0025 Oh Mandor 81,000.00
Total :
3 1 M2 Pengecat Tembok Baru (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup
0.1000 Kg Plamur 12,000.00
0.1000 Kg Cat Dasar 43,600.00
0.2600 Kg Cat Penutup 2 x 30,000.00
0.0200 Oh Pekerja 55,000.00
0.0630 Oh Tukang Cat 68,000.00
NO. URAIAN
SATUAN
1 2 3
0.0063 Oh Kepala Tukang 75,000.00
0.0025 Oh Mandor 81,000.00
Total :
4 1 M2 Pengecat Permukaan Baja (1 lapis dengan Cat Besi)
0.3000 Kg Cat Besi 70,500.00
0.0100 Bh Kuas 16,800.00
0.0060 Oh Pekerja 55,000.00
0.0600 Oh Tukang Cat 68,000.00
0.0120 Oh Kepala Tukang 75,000.00
0.0060 Oh Mandor 81,000.00
Total :
5 1 M2 Pengecat Lantai Dasar (Parkir)
0.1000 Kg Cat Anti Air 35,200.00
0.0100 Bh Kuas 16,800.00
0.2000 Oh Pekerja 55,000.00
0.2000 Oh Tukang Cat 68,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
6 1 M2 Coating Style Bali
0.2000 Ltr Cat Pelapis 60,000.00
0.0250 Bh Kuas 16,800.00
0.0250 Oh Pekerja 55,000.00
0.2500 Oh Tukang Cat 68,000.00
0.0250 Oh Kepala Tukang 75,000.00
0.0100 Oh Mandor 81,000.00
Total :
XII. PEKERJAAN ALUMINIUM
1 1 M2 Pasang Kaca Rangka Aluminium
1.1000 M2 Kaca Bening 12 mm 200,000.00
4.5000 M1 Profil 18,150.00
0.2700 Tube Sealant 25,000.00
0.2000 Oh Pekerja 55,000.00
0.2000 Oh Tukang Besi 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
XIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 1 Bh Pasang Engsel Pintu
1.0000 Bh Engsel Pintu 35,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Besi 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
2 1 Bh Pasang Engsel Jendela Kupu - Kupu
NO. URAIAN
SATUAN
1 2 3
1.0000 Bh Engsel Kupu - Kupu 35,000.00
0.0100 Oh Pekerja 55,000.00
0.1000 Oh Tukang Besi 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
NO. URAIAN
SATUAN
1 2 3
3 1 Bh Pasang Kait Angin
1.0000 Bh Kait Angin 15,000.00
0.0150 Oh Pekerja 55,000.00
0.1500 Oh Tukang Besi 75,000.00
0.0150 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
4 1 Bh Pasang Grendel
1.0000 Bh Grendel 20,000.00
0.0100 Oh Pekerja 55,000.00
0.5000 Oh Tukang Kayu 75,000.00
0.0100 Oh Kepala Tukang 75,000.00
0.0050 Oh Mandor 81,000.00
Total :
5 1 Bh Pasang Kunci Yalle
1.0000 Bh Kunci Yalle 145,200.00
0.0200 Oh Pekerja 55,000.00
0.2000 Oh Tukang Besi 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
6 1 Bh Pasang Kunci Yuri
1.0000 Bh Kunci Yuri 100,000.00
0.0200 Oh Pekerja 55,000.00
0.2000 Oh Tukang Besi 75,000.00
0.0200 Oh Kepala Tukang 75,000.00
0.0010 Oh Mandor 81,000.00
Total :
XIV. PEKERJAAN LANDSCAPE
1 1 M2 Pasang Paving Beton 20 x 20 Tebal 10 cm K 350
1.0000 M2 Pas. Paving Beton 20 x 20 Tebal 10 cm K 350 65,870.00
0.5000 Oh Pekerja 55,000.00
0.2500 Oh Tukang Batu 75,000.00
0.0250 Oh Kepala Tukang 75,000.00
0.0250 Oh Mandor 81,000.00
Total :
R ANALISA

HARGA
BAHAN UPAH JUMLAH
4 5 6

27,600.00 27,600.00
240.00 240.00
31,500.00 31,500.00
7,500.00 7,500.00
5,500.00 5,500.00
750.00 750.00
405.00 405.00
59,340.00 14,155.00 73,495.00

5,500.00 5,500.00
4,050.00 4,050.00
9,550.00 9,550.00

366,685.00 366,685.00
26,973.00 26,973.00
393,658.00 393,658.00

366,685.00 366,685.00
2,673.00 2,673.00
369,358.00 369,358.00

22,000.00 22,000.00
3,240.00 3,240.00
25,240.00 25,240.00

55,000.00 55,000.00
2,592.00 2,592.00
57,592.00 57,592.00

120,000.00 120,000.00
27,500.00 27,500.00
4,050.00 4,050.00
120,000.00 31,550.00 151,550.00

27,500.00 27,500.00
4,050.00 4,050.00
31,550.00 31,550.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

180,000.00 180,000.00
16,500.00 16,500.00
810.00 810.00
180,000.00 17,310.00 197,310.00

10,560.00 10,560.00
1,539.00 1,539.00
12,099.00 12,099.00

18,150.00 18,150.00
810.00 810.00
18,960.00 18,960.00

198,000.00 198,000.00
347,100.00 347,100.00
74,725.00 74,725.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
619,825.00 150,450.00 770,275.00

198,000.00 198,000.00
262,600.00 262,600.00
84,875.00 84,875.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
545,475.00 150,450.00 695,925.00

216,000.00 216,000.00
176,800.00 176,800.00
95,200.00 95,200.00
82,500.00 82,500.00
56,250.00 56,250.00
5,625.00 5,625.00
6,075.00 6,075.00
488,000.00 150,450.00 638,450.00

216,000.00 216,000.00
64,800.00 64,800.00
42,900.00 42,900.00
29,250.00 29,250.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
2,925.00 2,925.00
3,159.00 3,159.00
280,800.00 78,234.00 359,034.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

321,100.00 321,100.00
87,516.99 87,516.99
92,497.41 92,497.41
4,300.00 4,300.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
505,414.40 120,198.00 625,612.40

388,700.00 388,700.00
80,467.29 80,467.29
94,164.03 94,164.03
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
568,706.32 120,198.00 688,904.32

457,600.00 457,600.00
73,619.01 73,619.01
95,460.29 95,460.29
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
632,054.30 120,198.00 752,252.30

536,900.00 536,900.00
68,583.51 68,583.51
94,534.39 94,534.39
5,375.00 5,375.00
90,750.00 90,750.00
20,625.00 20,625.00
2,100.00 2,100.00
6,723.00 6,723.00
705,392.90 120,198.00 825,590.90

159,250.00 159,250.00
94,500.00 94,500.00
197,600.00 197,600.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
90,750.00 90,750.00
6,480.00 6,480.00
18,750.00 18,750.00
1,875.00 1,875.00
451,350.00 117,855.00 569,205.00

73,500.00 73,500.00
2,625.00 2,625.00
3,850.00 3,850.00
5,250.00 5,250.00
525.00 525.00
324.00 324.00
76,125.00 9,949.00 86,074.00
8,607.40

60,000.00 60,000.00
3,600.00 3,600.00
1,000.00 1,000.00
28,600.00 28,600.00
19,500.00 19,500.00
1,950.00 1,950.00
2,106.00 2,106.00
64,600.00 52,156.00 116,756.00

60,000.00 60,000.00
3,600.00 3,600.00
1,000.00 1,000.00
28,600.00 28,600.00
19,500.00 19,500.00
1,950.00 1,950.00
2,106.00 2,106.00
64,600.00 52,156.00 116,756.00

60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
75,000.00 75,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
333,800.00 66,198.00 399,998.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
90,000.00 90,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
348,800.00 66,198.00 414,998.00

60,000.00 60,000.00
4,800.00 4,800.00
2,000.00 2,000.00
75,000.00 75,000.00
42,000.00 42,000.00
450,000.00 450,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
633,800.00 66,198.00 699,998.00

45,000.00 45,000.00
4,800.00 4,800.00
1,500.00 1,500.00
75,000.00 75,000.00
42,000.00 42,000.00
150,000.00 150,000.00
36,300.00 36,300.00
24,750.00 24,750.00
2,475.00 2,475.00
2,673.00 2,673.00
318,300.00 66,198.00 384,498.00

300,000.00 300,000.00
18,000.00 18,000.00
4,000.00 4,000.00
1,099,000.00 1,099,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
291,500.00 291,500.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,650.00 19,650.00
21,465.00 21,465.00
2,133,425.00 529,490.00 2,662,915.00

405,000.00 405,000.00
24,000.00 24,000.00
6,000.00 6,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
310,750.00 310,750.00
20,625.00 20,625.00
117,000.00 117,000.00
105,000.00 105,000.00
24,225.00 24,225.00
22,923.00 22,923.00
2,630,550.00 600,523.00 3,231,073.00

600,000.00 600,000.00
48,000.00 48,000.00
20,000.00 20,000.00
2,205,000.00 2,205,000.00
78,750.00 78,750.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
750,000.00 750,000.00
420,000.00 420,000.00
1,500,000.00 1,500,000.00
387,750.00 387,750.00
20,625.00 20,625.00
123,750.00 123,750.00
157,500.00 157,500.00
30,225.00 30,225.00
28,593.00 28,593.00
6,294,800.00 748,443.00 7,043,243.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
770,000.00 770,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
5,352,825.00 529,715.00 5,882,540.00

480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,470,000.00 1,470,000.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
6,052,825.00 529,715.00 6,582,540.00

480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,102,500.00 1,102,500.00
39,375.00 39,375.00
436,800.00 436,800.00
94,500.00 94,500.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
141,750.00 141,750.00
600,000.00 600,000.00
336,000.00 336,000.00
2,400,000.00 2,400,000.00
291,500.00 291,500.00
20,625.00 20,625.00
97,500.00 97,500.00
78,750.00 78,750.00
19,875.00 19,875.00
21,465.00 21,465.00
5,685,325.00 529,715.00 6,215,040.00

480,000.00 480,000.00
38,400.00 38,400.00
16,000.00 16,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
700,000.00 700,000.00
336,000.00 336,000.00
1,200,000.00 1,200,000.00
349,250.00 349,250.00
20,625.00 20,625.00
123,750.00 123,750.00
105,000.00 105,000.00
24,975.00 24,975.00
25,758.00 25,758.00
4,965,950.00 649,358.00 5,615,308.00

375,000.00 375,000.00
36,000.00 36,000.00
12,000.00 12,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
525,000.00 525,000.00
300,000.00 300,000.00
1,050,000.00 1,050,000.00
349,250.00 349,250.00
20,625.00 20,625.00
123,750.00 123,750.00
105,000.00 105,000.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
24,975.00 24,975.00
25,758.00 25,758.00
4,493,550.00 649,358.00 5,142,908.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

360,000.00 360,000.00
38,400.00 38,400.00
12,000.00 12,000.00
1,470,000.00 1,470,000.00
52,500.00 52,500.00
436,800.00 436,800.00
94,500.00 94,500.00
141,750.00 141,750.00
525,000.00 525,000.00
300,000.00 300,000.00
1,050,000.00 1,050,000.00
310,750.00 310,750.00
20,625.00 20,625.00
117,000.00 117,000.00
105,000.00 105,000.00
24,225.00 24,225.00
22,923.00 22,923.00
4,480,950.00 600,523.00 5,081,473.00

3,000.00 3,000.00
120.00 120.00
21,000.00 21,000.00
787.50 787.50
5,200.00 5,200.00
1,050.00 1,050.00
1,575.00 1,575.00
9,900.00 9,900.00
1,500.00 1,500.00
1,500.00 1,500.00
1,500.00 1,500.00
450.00 450.00
729.00 729.00
32,732.50 15,579.00 48,311.50

4,500.00 4,500.00
240.00 240.00
25,200.00 25,200.00
875.00 875.00
7,150.00 7,150.00
1,575.00 1,575.00
2,625.00 2,625.00
16,335.00 16,335.00
2,475.00 2,475.00
2,475.00 2,475.00
2,475.00 2,475.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
750.00 750.00
1,215.00 1,215.00
42,165.00 25,725.00 67,890.00

98,700.00 98,700.00
24,635.00 24,635.00
6,650.00 6,650.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
129,985.00 25,965.00 155,950.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

98,700.00 98,700.00
18,681.00 18,681.00
7,000.00 7,000.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
124,381.00 25,965.00 150,346.00

98,700.00 98,700.00
12,584.00 12,584.00
7,875.00 7,875.00
16,500.00 16,500.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
119,159.00 25,965.00 145,124.00

154,000.00 154,000.00
15,275.00 15,275.00
6,125.00 6,125.00
14,850.00 14,850.00
10,125.00 10,125.00
1,012.50 1,012.50
1,093.50 1,093.50
175,400.00 27,081.00 202,481.00

33,750.00 33,750.00
9,750.00 9,750.00
4,725.00 4,725.00
13,650.00 13,650.00
17,600.00 17,600.00
7,500.00 7,500.00
750.00 750.00
1,215.00 1,215.00
61,875.00 27,065.00 88,940.00

195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00

195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00

195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00

195,000.00 195,000.00
12,090.00 12,090.00
3,150.00 3,150.00
6,500.00 6,500.00
2,430.00 2,430.00
3,375.00 3,375.00
33,750.00 33,750.00
33,000.00 33,000.00
216,740.00 72,555.00 289,295.00

195,000.00 195,000.00
14,794.00 14,794.00
7,350.00 7,350.00
19,500.00 19,500.00
2,430.00 2,430.00
2,625.00 2,625.00
26,250.00 26,250.00
34,100.00 34,100.00
236,644.00 65,405.00 302,049.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

7,500.00 7,500.00
1,482.00 1,482.00
525.00 525.00
1,300.00 1,300.00
405.00 405.00
675.00 675.00
6,750.00 6,750.00
4,950.00 4,950.00
10,807.00 12,780.00 23,587.00

235,450.00 235,450.00
12,090.00 12,090.00
3,150.00 3,150.00
6,500.00 6,500.00
2,430.00 2,430.00
3,375.00 3,375.00
33,750.00 33,750.00
33,000.00 33,000.00
257,190.00 72,555.00 329,745.00

13,291.20 13,291.20
3,500.00 3,500.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
810.00 810.00
16,791.20 29,685.00 46,476.20

10,108.80 10,108.80
4,025.00 4,025.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
1,215.00 1,215.00
14,133.80 30,090.00 44,223.80

6,739.20 6,739.20
4,550.00 4,550.00
16,500.00 16,500.00
11,250.00 11,250.00
1,125.00 1,125.00
1,215.00 1,215.00
11,289.20 30,090.00 41,379.20
HARGA
BAHAN UPAH JUMLAH
4 5 6
4,225.00 4,225.00
11,000.00 11,000.00
6,800.00 6,800.00
750.00 750.00
810.00 810.00
4,225.00 19,360.00 23,585.00

35,500.00 35,500.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
35,668.00 21,082.50 56,750.50

7,800,000.00 7,800,000.00
135,000.00 135,000.00
72,800.00 72,800.00
368,500.00 368,500.00
1,507,500.00 1,507,500.00
90,000.00 90,000.00
16,200.00 16,200.00
8,007,800.00 1,982,200.00 9,990,000.00

11,000,000.00 11,000,000.00
16,250.00 16,250.00
40,000.00 40,000.00
385,000.00 385,000.00
1,575,000.00 1,575,000.00
157,500.00 157,500.00
28,350.00 28,350.00
11,056,250.00 2,145,850.00 13,202,100.00

145,000.00 145,000.00
650.00 650.00
5,500.00 5,500.00
15,000.00 15,000.00
1,500.00 1,500.00
405.00 405.00
145,650.00 22,405.00 168,055.00

20,350.00
3,750.00
375.00
2,750.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
243.00
20,350.00 7,118.00 27,468.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

400,000.00 400,000.00
20,000.00 20,000.00
55,000.00 55,000.00
225,000.00 225,000.00
22,500.00 22,500.00
4,050.00 4,050.00
420,000.00 306,550.00 726,550.00

240,000.00 240,000.00
90,000.00 90,000.00
12,000.00 12,000.00
44,000.00 44,000.00
180,000.00 180,000.00
18,000.00 18,000.00
3,240.00 3,240.00
342,000.00 245,240.00 587,240.00

99,000.00 99,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
64.80 64.80
99,000.00 13,264.80 112,264.80

220,000.00 220,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
64.80 64.80
220,000.00 13,264.80 233,264.80

120,000.00 120,000.00
2,100.00 2,100.00
6,050.00 6,050.00
8,250.00 8,250.00
825.00 825.00
445.50 445.50
122,100.00 15,570.50 137,670.50

60,000.00 60,000.00
2,100.00 2,100.00
6,050.00 6,050.00
8,250.00 8,250.00
825.00 825.00
445.50 445.50
HARGA
BAHAN UPAH JUMLAH
4 5 6
62,100.00 15,570.50 77,670.50

140,000.00 140,000.00
1,950.00 1,950.00
420.00 420.00
2,750.00 2,750.00
3,750.00 3,750.00
375.00 375.00
162.00 162.00
142,370.00 7,037.00 149,407.00

73,500.00 73,500.00
1,950.00 1,950.00
420.00 420.00
2,750.00 2,750.00
3,750.00 3,750.00
375.00 375.00
162.00 162.00
75,870.00 7,037.00 82,907.00

77,000.00 77,000.00
650.00 650.00
27,500.00 27,500.00
37,500.00 37,500.00
3,750.00 3,750.00
2,025.00 2,025.00
77,650.00 70,775.00 148,425.00

36,750.00 36,750.00
1,400.00 1,400.00
3,750.00
375.00
2,750.00
243.00
38,150.00 7,118.00 45,268.00

30,450.00 30,450.00
8,250.00 8,250.00
3,750.00 3,750.00
375.00 375.00
648.00 648.00
30,450.00 13,023.00 43,473.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

65,340.00 65,340.00
3,450.00 3,450.00
15,750.00 15,750.00
67,650.00 67,650.00
27,500.00 27,500.00
37,500.00 37,500.00
3,750.00 3,750.00
2,025.00 2,025.00
152,190.00 70,775.00 222,965.00

40,040.00 40,040.00
1,540.00 1,540.00
16,500.00 16,500.00
26,250.00 26,250.00
2,625.00 2,625.00
1,215.00 1,215.00
41,580.00 46,590.00 88,170.00

112,500.00 112,500.00
8,250.00 8,250.00
4,500.00 4,500.00
450.00 450.00
648.00 648.00
112,500.00 13,848.00 126,348.00

32,500.00 32,500.00
10,400.00 10,400.00
22,000.00 22,000.00
15,000.00 15,000.00
1,500.00 1,500.00
162.00 162.00
42,900.00 38,662.00 81,562.00

42,900.00 42,900.00
14,850.00 14,850.00
30,000.00 30,000.00
3,000.00 3,000.00
1,093.50 1,093.50
42,900.00 48,943.50 91,843.50

12,500.00 12,500.00
21,875.00 21,875.00
17,500.00 17,500.00
1,650.00 1,650.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
3,500.00 3,500.00
8,350.00 8,350.00
29,120.00 29,120.00
7,440.00 7,440.00
1,000.00 1,000.00
5,500.00 5,500.00
3,750.00 3,750.00
375.00 375.00
405.00 405.00
102,935.00 10,030.00 112,965.00

17,000.00 17,000.00
195.00 195.00
161,500.00 161,500.00
2,200.00 2,200.00
30,000.00 30,000.00
1,875.00 1,875.00
81.00 81.00
178,695.00 34,156.00 212,851.00

45,500.00 45,500.00
1,300.00 1,300.00
2,250.00 2,250.00
33,000.00 33,000.00
135,000.00 135,000.00
13,500.00 13,500.00
2,430.00 2,430.00
49,050.00 183,930.00 232,980.00

30,000.00 30,000.00
8,750.00 8,750.00
1,980.00 1,980.00
3,750.00 3,750.00
450.00 450.00
145.80 145.80
38,750.00 6,325.80 45,075.80

30,000.00 30,000.00
8,750.00 8,750.00
2,970.00 2,970.00
5,625.00 5,625.00
675.00 675.00
218.70 218.70
38,750.00 9,488.70 48,238.70
HARGA
BAHAN UPAH JUMLAH
4 5 6
120,000.00 120,000.00
35,000.00 35,000.00
4,455.00 4,455.00
8,437.50 8,437.50
1,012.50 1,012.50
332.10 332.10
155,000.00 14,237.10 169,237.10
HARGA
BAHAN UPAH JUMLAH
4 5 6

97,678.80
29,596.50
1,578,633.00
464,349.90
247,642.50
85,380.75
335,527.29
206,671.30
250,000.00
100,000.00

18,425.20
15,982.11
28,350.00
30,000.00
3,488,237.35

1,000,000.00 1,000,000.00
60,000.00 60,000.00
181,500.00 181,500.00
82,500.00 82,500.00
75.00 75.00
12,960.00 12,960.00
1,060,000.00 277,035.00 1,337,035.00

450,000.00 450,000.00
7,800.00 7,800.00
1,750.00 1,750.00
55,000.00 55,000.00
112,500.00 112,500.00
112,500.00 112,500.00
12,960.00 12,960.00
459,550.00 292,960.00 752,510.00

650,000.00 650,000.00
39,000.00 39,000.00
7,800.00 7,800.00
1,750.00 1,750.00
55,000.00 55,000.00
75,000.00 75,000.00
7,500.00 7,500.00
8,100.00 8,100.00
698,550.00 145,600.00 844,150.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
600,000.00 600,000.00
72,000.00 72,000.00
780.00 780.00
1,750.00 1,750.00
66,000.00 66,000.00
108,750.00 108,750.00
11,250.00 11,250.00
8,100.00 8,100.00
674,530.00 194,100.00 868,630.00

275,000.00 275,000.00
49,500.00 49,500.00
99,000.00 99,000.00
202,500.00 202,500.00
40,500.00 40,500.00
8,910.00 8,910.00
324,500.00 350,910.00 675,410.00

200,000.00 200,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
200,000.00 9,205.00 209,205.00

150,000.00 150,000.00
37.50 37.50
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
150,037.50 9,205.00 159,242.50

250,000.00 250,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
250,000.00 9,205.00 259,205.00

150,000.00 150,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
405.00 405.00
150,000.00 9,205.00 159,205.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

800,000.00
48,000.00
7,800.00
1,750.00
55,000.00
75,000.00
7,500.00
8,100.00
857,550.00 145,600.00 1,003,150.00

225,000.00
27,000.00
1,650.00
22,500.00
2,250.00
121.50
252,000.00 26,521.50 278,521.50

8,850.00 8,850.00
1,450.00 1,450.00
410.00 410.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
10,878.00 21,082.50 31,960.50

8,325.00 8,325.00
20,646.00 20,646.00
820.00 820.00
168.00 168.00
8,800.00 8,800.00
10,880.00 10,880.00
1,200.00 1,200.00
202.50 202.50
29,959.00 21,082.50 51,041.50

1,200.00 1,200.00
4,360.00 4,360.00
7,800.00 7,800.00
1,100.00 1,100.00
4,284.00 4,284.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
472.50 472.50
202.50 202.50
13,360.00 5,856.50 19,419.00

21,150.00 21,150.00
168.00 168.00
330.00 330.00
4,080.00 4,080.00
900.00 900.00
486.00 486.00
21,318.00 5,796.00 27,114.00

3,520.00 3,520.00
168.00 168.00
11,000.00 11,000.00
13,600.00 13,600.00
1,500.00 1,500.00
810.00 810.00
3,688.00 26,910.00 30,598.00

12,000.00 12,000.00
420.00 420.00
1,375.00 1,375.00
17,000.00 17,000.00
1,875.00 1,875.00
810.00 810.00
12,420.00 21,060.00 33,480.00

220,000.00 220,000.00
81,675.00 81,675.00
6,750.00 6,750.00
11,000.00 11,000.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
88,425.00 27,581.00 336,006.00

35,000.00 35,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
81.00 81.00
35,000.00 13,281.00 48,281.00
HARGA
BAHAN UPAH JUMLAH
4 5 6
35,000.00 35,000.00
550.00 550.00
7,500.00 7,500.00
750.00 750.00
81.00 81.00
35,000.00 8,881.00 43,881.00
HARGA
BAHAN UPAH JUMLAH
4 5 6

15,000.00 15,000.00
825.00 825.00
11,250.00 11,250.00
1,125.00 1,125.00
81.00 81.00
15,000.00 13,281.00 28,281.00

20,000.00 20,000.00
550.00 550.00
37,500.00 37,500.00
750.00 750.00
405.00 405.00
20,000.00 39,205.00 59,205.00

145,200.00 145,200.00
1,100.00 1,100.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
145,200.00 17,681.00 162,881.00

100,000.00 100,000.00
1,100.00 1,100.00
15,000.00 15,000.00
1,500.00 1,500.00
81.00 81.00
100,000.00 17,681.00 117,681.00

65,870.00 65,870.00
27,500.00 27,500.00
18,750.00 18,750.00
1,875.00 1,875.00
2,025.00 2,025.00
65,870.00 50,150.00 116,020.00

Amlapura, 7 Mei 2015


Kontraktor,
PT. ASRI CIPTA NATHA ALAM
HARGA
BAHAN UPAH JUMLAH
4 5 6
I NENGAH ASTRAWAN
DIREKTUR
### #REF!
### #REF!
### #REF!

NO. URAIAN

1 2
I. PEKERJAAN PERSIAPAN
1 1 M' Pengukuran & pemasangan bouwplank.
0.0120 M³ Kayu usuk 4/6 klas III
0.0200 Kg. Paku biasa 2"-5"
0.0070 M³ Kayu papan 3/20 klas III
0.1000 Oh Tukang kayu
0.1000 Oh Pekerja
0.0100 Oh Kepala tukang
0.0050 Oh Mandor

2 1 M² Membersihkan lapangan dan peralatan.


0.1000 Oh Pekerja
0.0500 Oh Mandor

3 1 M³ Bongkaran beton bertulang.


6.6670 Oh Pekerja
0.3330 Oh Mandor

4 1 M³ Bongkaran Dinding Tembok Bata Merah


6.6670 Oh Pekerja
0.0330 Oh Mandor

II. PEKERJAAN TANAH


1. 1 M³ Galian tanah biasa
0.4000 Oh Pekerja
0.0250 Oh Mandor

2 1 M³ Galian tanah keras


1.0000 Oh Pekerja
0.0320 Oh Mandor

3 1 M³ Urug Tanah dengan Pemadatan


1.2000 M3 Tanah Urug
0.1333 Oh Pekerja
0.0083 Oh Mandor

4 1 M³ Pemadatan tanah.
0.5000 Oh Pekerja
0.0500 Oh Mandor

5 1 M³ Urugan pasir.
1.2000 M³ Pasir Urug
0.3000 Oh Pekerja
0.0100 Oh Mandor

6 1 M³ Urugan kembali
0.1333 Oh Pekerja
0.0083 Oh Mandor

7 1 M³ Membuang tanah
0.3300 Oh Pekerja
0.0100 Oh Mandor

III. PEKERJAAN PONDASI


1 1 M³ Pasang pondasi batu kali 1 Pc : 2 Ps
1.1000 M³ Batu belah 15/20 cm
202.0000 Kg. Semen Portland
0.4270 M³ Pasir pasangan
1.5000 Oh Pekerja
0.7500 Oh Tukang Batu
0.0750 Oh Kepala Tukang
0.0750 Oh Mandor

2 1 M³ Pasang pondasi batu kali 1 Pc : 3 Ps


1.1000 M³ Batu belah 15/20 cm
202.0000 Kg. Semen Portland
0.4850 M³ Pasir pasangan
1.5000 Oh Pekerja
0.7500 Oh Tukang Batu
0.0750 Oh Kepala Tukang
0.0750 Oh Mandor

3 1 M³ Pasang pondasi batu kali 1 Pc : 5 Ps


1.2000 M³ Batu belah 15/20 cm
136.0000 Kg. Semen Portland
0.5440 M³ Pasir pasangan
1.5000 Oh Pekerja
0.7500 Oh Tukang Batu
0.0750 Oh Kepala Tukang
0.0750 Oh Mandor

4 1 M³ Pasangan pondasi batu kosong.


1.2000 M³ Batu bulat 15/20 cm
0.4320 M³ Pasir urug
0.7800 Oh Pekerja
0.3900 Oh Tukang Batu
0.0390 Oh Kepala Tukang
0.0390 Oh Mandor

IV PEKERJAAN BETON
1 1 M³ Membuat Beton Mutu fc = 7,4 Mpa (K100), Slump (12 ± 2 )cm,w/c = 0,87
247.0000 Kg. Semen portland
869.0000 Kg. Pasir beton
999.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor

2 1 M³ Membuat Beton Mutu fc = 12,2 Mpa (K150), Slump (12 ± 2 )cm,w/c = 0,72
299.0000 Kg. Semen portland
799.0000 Kg. Pasir beton
1017.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor

3 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K200), Slump (12 ± 2 )cm,w/c = 0,61
352.0000 Kg. Semen portland
731.0000 Kg. Pasir beton
1031.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor

4 1 M³ Membuat Beton Mutu fc = 16,9 Mpa (K300), Slump (12 ± 2 )cm,w/c = 0,52
413.0000 Kg. Semen portland
681.0000 Kg. Pasir beton
1021.0000 Kg. Koral beton
215.0000 Lt Air
1.6500 Oh Pekerja
0.2750 Oh Tukang batu
0.0280 Oh Kepala Tukang
0.0830 Oh Mandor

5 1 M³ Membuat Beton Rabat


1 Pc : 3Ps : 5 Krl.
0.9100 M3. Krikil
0.5400 M³ Pasir beton
152.0000 Kg. Semen portland
1.6500 Oh Pekerja
0.0800 Oh Mandor
0.2500 Oh Tukang batu
0.0250 Oh Kepala Tukang

6 Pembesian 10 Kg dengan Besi Polos / Ulir


10.5000 Kg Besi Beton Polos
0.1500 Kg Kawat Beton
0.0700 Oh Pekerja
0.0700 Oh Tukang Besi
0.0070 Oh Kepala Tukang
0.0040 Oh Mandor

1 KG DENGAN BESI POLOS ATAU BESI ULIR


7 1 M2 Pasang Bekisting untuk Pondasi
0.0400 M3 Kayu klas III
0.3000 Kg Paku biasa 5' - 10 '
0.1000 Ltr Minyak bekisting
0.5200 Oh Pekerja
0.2600 Oh Tukang kayu
0.0260 Oh Kepala Tukang
0.0260 Oh Mandor

8 1 M2 Pasang Bekisting untuk Sloof


0.0400 M3 Kayu klas III
0.3000 Kg Paku biasa 5' - 10 '
0.1000 Ltr Minyak bekisting
0.5200 Oh Pekerja
0.2600 Oh Tukang kayu
0.0260 Oh Kepala Tukang
0.0260 Oh Mandor

9 1 M2 Pasang Bekisting untuk Kolom


0.0400 M3 Kayu klas III
0.4000 Kg Paku biasa 5' - 10 '
0.2000 Ltr Minyak bekisting
0.0150 M3 Balok Kayu Klas II
0.3500 Lbr Plywood tebal 9 mm
2.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
0.6600 Oh Pekerja
0.3300 Oh Tukang kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

10 1 M2 Pasang Bekisting untuk Balok


0.0400 M3 Kayu klas III
0.4000 Kg Paku biasa 5' - 10 '
0.2000 Ltr Minyak bekisting
0.0180 M3 Balok Kayu Klas II
0.3500 Lbr Plywood tebal 9 mm
2.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
0.6600 Oh Pekerja
0.3300 Oh Tukang kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

11 1 M2 Pasang Bekisting untuk Lantai


0.0400 M3 Kayu klas III
0.4000 Kg Paku biasa 5' - 10 '
0.2000 Ltr Minyak bekisting
0.0150 M3 Balok Kayu Klas II
0.3500 Lbr Plywood tebal 9 mm
6.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
0.6600 Oh Pekerja
0.3300 Oh Tukang kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

12 1 M2 Pasang Bekisting untuk Tangga


0.0300 M3 Kayu klas III
0.4000 Kg Paku biasa 5' - 10 '
0.1500 Ltr Minyak bekisting
0.0150 M3 Balok Kayu Klas II
0.3500 Lbr Plywood tebal 9 mm
2.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
0.6600 Oh Pekerja
0.3300 Oh Tukang kayu
0.0330 Oh Kepala Tukang
0.0330 Oh Mandor

13 1 M3 Membuat PONDASI beton bertulang (150 Kg besi + bekesting)


0.2000 M3 Kayu klas III
1.5000 Kg Paku biasa 5' - 12 '
0.4000 Ltr Minyak bekisting
157.0000 Kg Besi beton polos
2.2500 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
5.3000 Oh Pekerja
0.2750 Oh Tukang batu
1.3000 Oh Tukang kayu
1.0500 Oh Tukang besi
0.2620 Oh Kepala Tukang
0.2650 Oh Mandor

14 1 M3 Membuat Sloof beton bertulang (200 Kg besi + bekesting)


0.2700 M3 Kayu klas III
2.0000 Kg Paku biasa 5' - 12 '
0.6000 Ltr Minyak bekisting
210.0000 Kg Besi beton polos
3.0000 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
5.6500 Oh Pekerja
0.2750 Oh Tukang batu
1.5600 Oh Tukang kayu
1.4000 Oh Tukang besi
0.3230 Oh Kepala Tukang
0.2830 Oh Mandor

15 1 M3 Membuat Kolom beton bertulang (300 Kg besi + bekesting)


0.4000 M3 Kayu klas III
4.0000 Kg Paku biasa 5' - 12 '
2.0000 Ltr Minyak bekisting
315.0000 Kg Besi beton polos
4.5000 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1500 M3 Kayu klas II balok
3.5000 Lbr Plywood tebal 9 mm
20.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
7.0500 Oh Pekerja
0.2750 Oh Tukang batu
1.6500 Oh Tukang kayu
2.1000 Oh Tukang besi
0.4030 Oh Kepala Tukang
0.3530 Oh Mandor

16 1 M3 Membuat Plat Lantai beton bertulang (100 Kg besi + bekesting)


0.3200 M3 Kayu klas III
3.2000 Kg Paku biasa 5' - 12 '
1.6000 Ltr Minyak bekisting
110.0000 Kg Besi beton polos
2.2500 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1200 M3 Kayu klas II balok
2.8000 Lbr Plywood tebal 9 mm
32.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
5.3000 Oh Pekerja
0.2750 Oh Tukang batu
1.3000 Oh Tukang kayu
1.0500 Oh Tukang besi
0.2650 Oh Kepala Tukang
0.2650 Oh Mandor

17 1 M3 Membuat Plat Lantai beton bertulang (200 Kg besi + bekesting)


0.3200 M3 Kayu klas III
3.2000 Kg Paku biasa 5' - 12 '
1.6000 Ltr Minyak bekisting
210.0000 Kg Besi beton polos
2.2500 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1200 M3 Kayu klas II balok
2.8000 Lbr Plywood tebal 9 mm
32.0000 Btg Dolken kayu 8 " - 10 '/4 m
5.3000 Oh Pekerja
0.2750 Oh Tukang batu
1.3000 Oh Tukang kayu
1.0500 Oh Tukang besi
0.2650 Oh Kepala Tukang
0.2650 Oh Mandor

18 1 M3 Membuat Plat Lantai beton bertulang (150 Kg besi + bekesting)


0.3200 M3 Kayu klas III
3.2000 Kg Paku biasa 5' - 12 '
1.6000 Ltr Minyak bekisting
157.5000 Kg Besi beton polos
2.2500 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1200 M3 Kayu klas II balok
2.8000 Lbr Plywood tebal 9 mm
32.0000 Btg Dolken kayu 8 " - 10 '/4 m
5.3000 Oh Pekerja
0.2750 Oh Tukang batu
1.3000 Oh Tukang kayu
1.0500 Oh Tukang besi
0.2650 Oh Kepala Tukang
0.2650 Oh Mandor

19 1 M3 Membuat Balok beton bertulang (200 Kg besi + bekesting)


0.3200 M3 Kayu klas III
3.2000 Kg Paku biasa 5' - 12 '
1.6000 Ltr Minyak bekisting
210.0000 Kg Besi beton polos
3.0000 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1400 M3 Kayu klas II balok
2.8000 Lbr Plywood tebal 9 mm
16.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
6.3500 Oh Pekerja
0.2750 Oh Tukang batu
1.6500 Oh Tukang kayu
1.4000 Oh Tukang besi
0.3330 Oh Kepala Tukang
0.3180 Oh Mandor
20 1 M3 Membuat tangga beton bertulang (200 Kg besi + bekesting)
0.2500 M3 Kayu klas III
3.0000 Kg Paku biasa 5' - 12 '
1.2000 Ltr Minyak bekisting
210.0000 Kg Besi beton polos
3.0000 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1050 M3 Kayu klas II balok
2.5000 Lbr Plywood tebal 9 mm
14.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
5.6500 Oh Pekerja
0.2750 Oh Tukang batu
1.5600 Oh Tukang kayu
1.4000 Oh Tukang besi
0.3230 Oh Kepala Tukang
0.2830 Oh Mandor

21 1 M3 Membuat dinding beton bertulang (200 Kg besi + bekesting)


0.2400 M3 Kayu klas III
3.0000 Kg Paku biasa 5' - 12 '
1.2000 Ltr Minyak bekisting
210.0000 Kg Besi beton polos
3.0000 Kg Kawat Beton
336.0000 Kg Semen portland
0.5400 M3 Pasir beton
0.8100 M3 Koral beton
0.1050 M3 Kayu klas II balok
2.5000 Lbr Plywood tebal 9 mm
14.0000 Btg Dolken kayu 8 cm - 10 cm/4 m
5.6500 Oh Pekerja
0.2750 Oh Tukang batu
1.5600 Oh Tukang kayu
1.4000 Oh Tukang besi
0.3230 Oh Kepala Tukang
0.2830 Oh Mandor
22 1 M1 Membuat kolom praktis beton bertulang (11 x 11) cm
0.0020 M3 Kayu klas III
0.0100 Kg Paku biasa 5' - 12 '
3.0000 Kg Besi beton polos
0.0450 Kg Kawat Beton
4.0000 Kg Semen portland
0.0060 M3 Pasir beton
0.0090 M3 Koral beton
0.1800 Oh Pekerja
0.0200 Oh Tukang batu
0.0200 Oh Tukang kayu
0.0200 Oh Tukang besi
0.0060 Oh Kepala Tukang
0.0090 Oh Mandor

23 1 M1 Membuat ring balok beton bertulang (10 x 15) cm


0.0030 M3 Kayu klas III
0.0200 Kg Paku biasa 5' - 12 '
3.6000 Kg Besi beton polos
0.0500 Kg Kawat Beton
5.5000 Kg Semen portland
0.0090 M3 Pasir beton
0.0150 M3 Koral beton
0.2970 Oh Pekerja
0.0330 Oh Tukang batu
0.0330 Oh Tukang kayu
0.0330 Oh Tukang besi
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor

V. PEKERJAAN DINDING
1. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 2Ps.
70.0000 Bh. Bata merah 5 x 11 x 22 cm
18.9500 Kg. Semen Portland
0.0380 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor

2. 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 3Ps.


70.0000 Bh. Bata merah 5 x 11 x 22 cm
14.3700 Kg. Semen Portland
0.0400 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor

3 1 M² Pas. Bata Merah Tebal ½ Bata, 1Pc : 5Ps.


70.0000 Bh. Bata merah 5 x 11 x 22 cm
9.6800 Kg. Semen Portland
0.0450 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor

4 1 M² Pas. Batu Dinding Random


1.1000 M2 Batu Palimanan
11.7500 Kg. Semen Portland
0.0350 M³ Pasir pasangan
0.2700 Oh Pekerja
0.1350 Oh Tukang Batu
0.0135 Oh Kepala Tukang
0.0135 Oh Mandor

5 1 M² Pas. Batako
12.5000 Bh. Batako
7.5000 Kg. Semen Portland
0.0270 M³ Pasir pasangan
1.9500 Kg. Besi Beton 8 mm
0.3200 Oh Pekerja
0.1000 Oh Tukang Batu
0.0100 Oh Kepala Tukang
0.0150 Oh Mandor
VI. PEKERJAAN LANTAI
1 1M2 Pas. Keramik Lantai 80 x 80
1.560 BH Keramik 80 x 80
11.380 Kg Semen
0.042 M3 Pasir pasangan
1.500 Kg Semen warna
0.012 Oh Mandor
0.012 Oh Kepala Tukang Batu
0.120 Oh Tukang batu
0.240 Oh Pekerja

2 1M2 Pas. Keramik Tangga 40 x 40


6.250 Bh Keramik 40 x 40
9.800 Kg Semen
0.042 M3 Pasir pasangan
1.300 Kg Semen warna
0.013 Oh Mandor
0.013 Oh Kepala Tukang Batu
0.125 Oh Tukang batu
0.250 Oh Pekerja

3 1M2 Pas. Keramik Lantai 60 x 60 WC Anti Slip


2.770 Bh Keramik 60 x 60
9.600 Kg Semen
0.042 M3 Pasir pasangan
1.500 Kg Semen warna
0.012 Oh Mandor
0.012 Oh Kepala Tukang Batu
0.120 Oh Tukang batu
0.240 Oh Pekerja

4 1M2 Pas. Keramik Dinding 30 x 60 WC


5.550 Bh Keramik 30 x 60
9.300 Kg Semen
0.018 M3 Pasir pasangan
0.500 Kg Semen warna
0.030 Oh Mandor
0.045 Oh Kepala Tukang Batu
0.450 Oh Tukang batu
0.600 Oh Pekerja

5 1M2 Pas. Keramik Meja Wastafel 60 x 60


2.770 Bh Keramik 60 x 60
9.600 Kg Semen
0.042 M3 Pasir pasangan
1.500 Kg Semen warna
0.012 Oh Mandor
0.012 Oh Kepala Tukang Batu
0.120 Oh Tukang batu
0.240 Oh Pekerja

6 1M' Pas. Plin Keramik 10 x 80 cm


1.250 Bh Keramik 80 x 80
1.140 Kg Semen
0.003 M3 Pasir pasangan
0.100 Kg Semen warna
0.005 Oh Mandor
0.009 Oh Kepala Tukang Batu
0.090 Oh Tukang batu
0.090 Oh Pekerja

7 1M2 Pas. Granit Star Black 60 x 60 WC


2.770 Bh Granit Star Black 60 x 60
9.300 Kg Semen
0.018 M3 Pasir pasangan
0.500 Kg Semen warna
0.012 Oh Mandor
0.012 Oh Kepala Tukang Batu
0.120 Oh Tukang batu
0.240 Oh Pekerja

VII. PEKERJAAN PLESTERAN


1. 1 M² Plesteran 1 Pc : 2 Ps, tebal 15 mm
10.2240 Kg. Semen Portland
0.0200 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.0100 Oh Mandor

2. 1 M² Plesteran 1 Pc : 3 Ps, tebal 15 mm


7.7760 Kg. Semen Portland
0.0230 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.0150 Oh Mandor

3. 1 M² Plesteran 1 Pc : 5 Ps, tebal 15 mm


5.1840 Kg. Semen Portland
0.0260 M³ Pasir pasangan
0.3000 Oh Pekerja
0.1500 Oh Tukang Batu
0.0150 Oh Kepala Tukang
0.0150 Oh Mandor

4. 1 M². Pekerjaan Acian dgn Semen


3.2500 Kg Semen Portland
0.2000 Oh Pekerja
0.1000 Oh Tukang Cat
0.0100 Oh Kepala Tukang
0.0100 Oh Mandor

5. 1 M2. Pekerjaan Waterfrofing


1.0000 Kg. Masterseal 440
0.0100 bh Kuas
0.1600 Oh Pekerja
0.1600 Oh Tukang Cat
0.0160 Oh Kepala Tukang
0.0025 Oh Mandor

VIII. PEKERJAAN KAYU


1 1 M3 Pek. Kontruksi Kuda-Kuda Expose Kayu Kamper
1.2000 M3 Kayu kamper Balok
15.0000 Kg. Besi Strip / Begel
5.6000 Kg. Paku 12 cm
6.7000 Oh Pekerja
20.1000 Oh Tukang Kayu
1.2000 Oh Kepala Tukang
0.2000 Oh Mandor

2 1 M³ Pek.Kusen Pintu & Jendela Kayu Bingkirai


1.1000 M³ Kayu Bingkirai balok 6/12
1.2500 Kg Paku
1.0000 Kg Lem Kayu
7.0000 Oh Pekerja
21.0000 Oh Tukang Kayu
2.1000 Oh Kepala Tukang
0.3500 Oh Mandor

3 1 M1 Pek.Lispang 3x3x30 cm, Kayu Bingkirai


0.0145 M³ Kayu Bingkirai
0.0500 Kg Paku 2'' - 5''
0.1000 Oh Pekerja
0.2000 Oh Tukang Kayu
0.0200 Oh Kepala Tukang
0.0050 Oh Mandor

4 1 M1 Pas. List Plapond


1.100 M' Gypzum
0.050 Oh Tukang kayu
0.005 Oh Kepala tukang kayu
0.050 Oh Pekerja
0.003 Oh Mandor

5 1 M2 Pek. Pintu Panil Kayu Bingkirai


0.0400 M³ Kayu Bingkirai papan 3/20
0.5000 Kg Lem Kayu
1.0000 Oh Pekerja
3.0000 Oh Tukang Kayu
0.3000 Oh Kepala Tukang
0.0500 Oh Mandor
6 1 M2 Pek. Pintu dan Jendela Kaca 5 mm Kayu Bingkirai
0.0240 M³ Kayu Bingkirai papan 3/20
1.0000 Kg Kaca 5 mm Bening
0.3000 Kg Lem Kayu
0.8000 Oh Pekerja
2.4000 Oh Tukang Kayu
0.2400 Oh Kepala Tukang
0.0400 Oh Mandor

7 1 M2 Pek. Pas. Kaca Mati


1.1000 M² Kaca 5 mm Bening
0.0150 Oh Pekerja
0.1500 Oh Tukang Kayu
0.0150 Oh Kepala Tukang
0.0008 Oh Mandor

8 1 M2 Pek. Pas. Kaca Mati


1.1000 M² Kaca 12 mm Bening
0.0150 Oh Pekerja
0.1500 Oh Tukang Kayu
0.0150 Oh Kepala Tukang
0.0008 Oh Mandor

9 1 M2 Pasang Usuk 5/7 Kayu Bingkirai


0.0120 M3 Usuk Kayu Kalor
0.1500 Kg. Paku Lis
0.1100 Oh Pekerja
0.1100 Oh Tukang Kayu
0.0110 Oh Kepala Tukang
0.0055 Oh Mandor

10 1 M2 Pasang Reng 3/5 Kayu Bingkirai


0.0060 M3 Usuk Kayu Kalor
0.1500 Kg. Paku Lis
0.1100 Oh Pekerja
0.1100 Oh Tukang Kayu
0.0110 Oh Kepala Tukang
0.0055 Oh Mandor
11 1 M2 Pasang Iga - Iga Kayu Bingkirai
0.0140 M³ Iga - Iga Kayu Kamper 5/7 Diprofil
0.1500 Kg Paku
0.0300 Kg Paku Lis
0.0500 Oh Pekerja
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0020 Oh Mandor

12 1 M1 Pasang Pemade, Pemucu Kayu Bingkirai


1.0500 M1 Pas. Pemade dan Pemucu 6/12 Diprofil
0.1500 Kg Paku
0.0300 Kg Paku Lis
0.0500 Oh Pekerja
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0020 Oh Mandor

13 1 M2 Plafond Variasi Pataka


1.1000 M2 Kayu Bingkirai
0.0500 Kg Paku 5'' - 7''
0.5000 Oh Pekerja
0.5000 Oh Tukang Kayu
0.0500 Oh Kepala Tukang
0.0250 Oh Mandor

14 1 M1 Pas. List Kayu Profil


1.050 M' List Kayu Profil 4/5
0.1000 Kg Paku List
0.050 Oh Tukang kayu
0.005 Oh Kepala tukang kayu
0.050 Oh Pekerja
0.003 Oh Mandor

15 1 M2 Pasang Lapisan Aluminium Foil


1.0500 M2 Aluminium Foil
0.1500 Oh Pekerja
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0080 Oh Mandor

16 1 M2 Pasang Langit Akustik Ukuran (60 x 120) cm + Rangka Aluminium


3.6000 M1 Profil Aluminium "T"
0.1500 Kg Kawat Diameter 4 mm
1.0500 M1 Ramset
1.5000 Lbr Akustik 60 cm x 120 cm
0.5000 Oh Pekerja
0.5000 Oh Tukang Besi
0.0500 Oh Kepala Tukang
0.0250 Oh Mandor

17 1 M2 Pasang Teak Wood


0.3640 Lbr Teak Wood
0.1100 Kg Paku
0.3000 Oh Pekerja
0.3500 Oh Tukang Kayu
0.0350 Oh Kepala Tukang
0.0150 Oh Mandor

IX. PEKERJAAN PENUTUP ATAP


1 1 M2 Pas. Atap Genteng Kodok Karang Pilang
25.0000 Bh Genteng Kodok Karang Pilang
0.1500 Oh Pekerja
0.0600 Oh Tukang Kayu
0.0060 Oh Kepala Tukang
0.0080 Oh Mandor

2 1 M1 Pek. Pasang Bubungan


5.0000 M1 Bubungan
8.0000 Kg Semen Portland
0.4000 Oh Pekerja
0.2000 Oh Tukang Kayu
0.0200 Oh Kepala Tukang
0.0020 Oh Mandor

3 1 M2 Pasang Plapond Teakwood


0.3900 Lbr Teakwood Jati
0.2700 Oh Pekerja
0.4000 Oh Tukang Kayu
0.0400 Oh Kepala Tukang
0.0135 Oh Mandor

4 1 M2 Pasang Plapond Gypzum 9 mm + Rangka Hollow


1.2500 M1 Rangka Aluminium Primer 4/4
2.5000 M2 Rangka Aluminium Sekunder 2/4
2.0000 M3 Rangka Penggantung 2/4
0.1100 Kg Paku sekrup
0.1000 Kg Paku Beton
1.6700 M1 Siku (Engel)
0.3640 Lbr Gypzum
0.9300 Kg Cornice
1.0000 Ls Pleter Bord
0.1000 Oh Pekerja
0.0500 Oh Tukang Kayu
0.0050 Oh Kepala Tukang
0.0050 Oh Mandor

5 1 M1 Pasang Talang Karet


1.0000 M1 Karet Talang Lbr 0.60
0.0150 Kg Paku
0.0190 M3 Kayu Papan Kruing
0.0400 Oh Pekerja
0.4000 Oh Tukang Besi
0.0250 Oh Kepala Tukang
0.0010 Oh Mandor

6 1 M2 Pasang Lambriziring
0.0070 M3 Papan Kayu Kamper
0.1000 Kg Paku
0.1500 Kg Paku Skrup 10 cm
0.6000 Oh Pekerja
1.8000 Oh Tukang Kayu
0.1800 Oh Kepala Tukang
0.0300 Oh Mandor
X. PEKERJAAN SANITASI
1 Memasang 1 M' pipa PVC tipe AW Ø ½" - 1 ½ "
1.2000 M1 Pipa PVC
35% harga pipa Perlengkapan
0.0360 Oh Pekerja
0.0600 Oh Tukang Pipa
0.0060 Oh Kepala Tukang
0.0018 Oh Mandor

2 Memasang 1 M' pipa PVC tipe AW Ø 2 "


1.2000 M1 Pipa PVC
35% harga pipa Perlengkapan
0.0540 Oh Pekerja
0.0900 Oh Tukang Pipa
0.0090 Oh Kepala Tukang
0.0027 Oh Mandor

3 Memasang 1 M' pipa PVC tipe AW Ø 3 " - Ø 4"


1.2000 M1 Pipa PVC
35% harga pipa Perlengkapan
0.0810 Oh Pekerja
0.1350 Oh Tukang Pipa
0.0135 Oh Kepala Tukang
0.0041 Oh Mandor

4 1 Bh Septiktank dan Peresapan (L=150cm,P=200,T=150Cm)


(SEPTIKTANK)
3.8700 M3 Galian Tanah
0.1500 M3 Urugan Pasir t=5cm
10.5000 M2 Pas. Bata Merah 1 : 3
10.5000 M2 Plesteran 1 : 3
10.5000 M2 Acian Semen
0.1500 M3 Rabatan 1 : 3 : 5
0.1260 M3 Ring Balok 12/15 (Fe=180)
0.3000 M3 Plat Beton T = 10 cm
1.0000 M1 Pipa Hawa Galvanis 1"
1.0000 M1 Pipa PVC 4"
(PERESAPAN)
0.7300 M3 Galian Tanah
0.0810 M3 Urugan Pasir t=5cm
0.1620 M3 Kerikil Beton
1.0000 Kg Ijuk

6 Memasang 1 Buah Kloset Duduk Toto type Avante CW 821 PJ/SW 821 JP Komplit
1.0000 Bh Kloset Duduk Toto type Avante
6% Perlengkapan
3.3000 Oh Pekerja
1.1000 Oh Tukang batu
0.0010 Oh Kepala Tukang
0.1600 Oh Mandor

7 Memasang 1 Buah Kloset Jongkok


1.0000 Bh Kloset Jongkok
6.0000 Kg Semen Portland
0.0100 M3 Pasir Pasangan
1.0000 Oh Pekerja
1.5000 Oh Tukang batu
1.5000 Oh Kepala Tukang
0.1600 Oh Mandor

8 Memasang 1 Buah Urinoir Toto U 57 M Bodi


1.0000 Bh Urinoir
6% Perlengkapan
6.0000 Kg Semen Portland
0.0100 M3 Pasir Pasangan
1.0000 Oh Pekerja
1.0000 Oh Tukang batu
0.1000 Oh Kepala Tukang
0.1000 Oh Mandor

9 Memasang 1 Buah Wastafel Toto Type Cerabo LW 523"


1.0000 Bh Wastafel
12% Perlengkapan
0.6000 Kg Semen Portland
0.0100 M3 Pasir Pasangan
1.2000 Oh Pekerja
1.4500 Oh Tukang batu
0.1500 Oh Kepala Tukang
0.1000 Oh Mandor

10 Memasang 1 Buah Bak Mandi (Fiber) 70 x 70 x 66 cm


1.0000 Bh Bak Mandi
18% Perlengkapan
1.8000 Oh Pekerja
2.7000 Oh Tukang batu
0.5400 Oh Kepala Tukang
0.1100 Oh Mandor

11 Memasang 1 Buah Floor Drain Toto Type Tx 1 Bv 1 " Square Flange"


1.0000 Bh Floor Drain
0.0100 Oh Pekerja
0.1000 Oh Tukang batu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor

12 Memasang 1 Buah Kran Air Toto T 205 LCSC


1.0000 Bh Kran Air
0.0250 Bh Seal Tape
0.0100 Oh Pekerja
0.1000 Oh Tukang batu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor

13 Memasang 1 Buah Jet Spray


1.0000 Bh Jet Spray
0.0100 Oh Pekerja
0.1000 Oh Tukang batu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor

14 Memasang 1 Buah Shower Spray


1.0000 Bh Shower Spray
0.0100 Oh Pekerja
0.1000 Oh Tukang batu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor

15 Memasang 1 Buah Partisi Urinoir A 100 TOTO


1.0000 bh Urinoir
6% x harga urinoir Perlengkapan
6.0000 kg Semen Portland
0.0100 m3 Pasir Pasangan
1.0000 Oh Pekerja
1.0000 Oh Tukang batu
0.1000 Oh Kepala Tukang
0.1000 Oh Mandor

16 Memasang 1 Buah Bak Cuci Piring Stainless Steel


1.0000 Bh Bak cuci stainless steel
12%xharga Water drain + asesories
0.0300 Oh Pekerja
0.3000 Oh Tukang batu
0.0300 Oh Kepala tukang
0.0015 Oh Mandor

XI. PEKERJAAN PENGECETAN


1 1 M2 Pengecat Bidang Kayu dengan Vernis
0.1500 Kg Vernis
0.0500 Kg Dempul
0.1000 Lbr Amplas
0.0100 Bh Kuas
0.1600 Oh Pekerja
0.1600 Oh Tukang Cat
0.0160 Oh Kepala Tukang
0.0025 Oh Mandor

2 1 M2 Pelaburan Bidang Kayu dengan Polituran Ultra


0.1500 Ltr Polituran
0.3720 Ltr Polituran Jadi
0.2000 Lbr Amplas
0.0100 Bh Kuas
0.1600 Oh Pekerja
0.1600 Oh Tukang Cat
0.0160 Oh Kepala Tukang
0.0025 Oh Mandor
3 1 M2 Pengecat Tembok Baru (1 lapis plamir,
1 lapis cat dasar, 2 lapis cat penutup
0.1000 Kg Plamur
0.1000 Kg Cat Dasar
0.2600 Kg Cat Penutup 2 x
0.0200 Oh Pekerja
0.0630 Oh Tukang Cat
0.0063 Oh Kepala Tukang
0.0025 Oh Mandor

4 1 M2 Pengecat Permukaan Baja (1 lapis dengan Cat Besi)


0.3000 Kg Cat Besi
0.0100 Bh Kuas
0.0060 Oh Pekerja
0.0600 Oh Tukang Cat
0.0120 Oh Kepala Tukang
0.0060 Oh Mandor

5 1 M2 Pengecat Lantai Dasar (Parkir)


0.1000 Kg Cat Anti Air
0.0100 Bh Kuas
0.2000 Oh Pekerja
0.2000 Oh Tukang Cat
0.0200 Oh Kepala Tukang
0.0100 Oh Mandor

6 1 M2 Coating Style Bali


0.2000 Ltr Cat Pelapis
0.0250 Bh Kuas
0.0250 Oh Pekerja
0.2500 Oh Tukang Cat
0.0250 Oh Kepala Tukang
0.0100 Oh Mandor

XII. PEKERJAAN ALUMINIUM


1 1 M2 Pasang Kaca Rangka Aluminium
1.1000 M2 Kaca Bening 12 mm
4.5000 M1 Profil
0.2700 Tube Sealant
0.2000 Oh Pekerja
0.2000 Oh Tukang Besi
0.0200 Oh Kepala Tukang
0.0010 Oh Mandor

XIII. PEKERJAAN PENGGANTUNG DAN PENGUNCI


1 1 Bh Pasang Engsel Pintu
1.0000 Bh Engsel Pintu
0.0150 Oh Pekerja
0.1500 Oh Tukang Besi
0.0150 Oh Kepala Tukang
0.0010 Oh Mandor

2 1 Bh Pasang Engsel Jendela Kupu - Kupu


1.0000 Bh Engsel Kupu - Kupu
0.0100 Oh Pekerja
0.1000 Oh Tukang Besi
0.0100 Oh Kepala Tukang
0.0010 Oh Mandor

3 1 Bh Pasang Kait Angin


1.0000 Bh Kait Angin
0.0150 Oh Pekerja
0.1500 Oh Tukang Besi
0.0150 Oh Kepala Tukang
0.0010 Oh Mandor

4 1 Bh Pasang Grendel
1.0000 Bh Grendel
0.0100 Oh Pekerja
0.5000 Oh Tukang Kayu
0.0100 Oh Kepala Tukang
0.0050 Oh Mandor

5 1 Bh Pasang Kunci Yalle


1.0000 Bh Kunci Yalle
0.0200 Oh Pekerja
0.2000 Oh Tukang Besi
0.0200 Oh Kepala Tukang
0.0010 Oh Mandor

6 1 Bh Pasang Kunci Yuri


1.0000 Bh Kunci Yuri
0.0200 Oh Pekerja
0.2000 Oh Tukang Besi
0.0200 Oh Kepala Tukang
0.0010 Oh Mandor

XIV. PEKERJAAN LANDSCAPE


1 1 M2 Pasang Paving Beton 20 x 20 Tebal 10 cm K 350
1.0000 M2 Pas. Paving Beton 20 x 20 Tebal 10 cm K 350
0.5000 Oh Pekerja
0.2500 Oh Tukang Batu
0.0250 Oh Kepala Tukang
0.0250 Oh Mandor

MATERIAL INSTALASI GAS MEDIS

NO URAIAN PEKERJAAN
I PEKERJAAN PERALATAN UTAMA DAN PENDUKUNG
01. PERALATAN UTAMA
1. Medical Gas Manifold Oxigen (O) Harris Lokal, 2x4Cyl
2. Supporting Material

02. INSTALASI DALAM BANGUNAN


2.1 INSTALASI PEMIPAAN
1. Pipa Tembaga ASTM B 819 Type L
- Diameter 3/8"
- Diameter 1/2"
- Diameter 5/8"
- Diameter 3/4"
2. Supporting Material

2.2 PERALATAN DALAM RUANGAN


1. Medical wall Outlet Oxygen (O), pin index, push type
2. Area alarm 1 gas (O)

II PEKERJAAN TESTING DAN KOMISIONING


1. Biaya Instalasi
2. Testing dan Kommisioning
DAFTAR ANALISA HARGA SATUAN

HARGA
SATUAN BAHAN UPAH JUMLAH
3 4 5 6

2,300,000.00 27,600.00 27,600.00


12,000.00 240.00 240.00
4,500,000.00 31,500.00 31,500.00
77,000.00 7,700.00 7,700.00
75,000.00 7,500.00 7,500.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 59,340.00 16,425.00 75,765.00

75,000.00 7,500.00 7,500.00


85,000.00 4,250.00 4,250.00
Total : 11,750.00 11,750.00

75,000.00 500,025.00 500,025.00


85,000.00 28,305.00 28,305.00
Total : 528,330.00 528,330.00

75,000.00 500,025.00 500,025.00


85,000.00 2,805.00 2,805.00
Total : 502,830.00 502,830.00

75,000.00 30,000.00 30,000.00


85,000.00 2,125.00 2,125.00
Total : 32,125.00 32,125.00

75,000.00 75,000.00 75,000.00


85,000.00 2,720.00 2,720.00
Total : 77,720.00 77,720.00

100,000.00 120,000.00 120,000.00


75,000.00 10,000.00 10,000.00
85,000.00 708.33 708.33
Total : 120,000.00 10,708.33 130,708.33

75,000.00 37,500.00 37,500.00


85,000.00 4,250.00 4,250.00
Total : 41,750.00 41,750.00

100,000.00 120,000.00 120,000.00


75,000.00 22,500.00 22,500.00
85,000.00 850.00 850.00
Total : 120,000.00 23,350.00 143,350.00

75,000.00 10,000.00 10,000.00


85,000.00 708.33 708.33
Total : 10,708.33 10,708.33

75,000.00 24,750.00 24,750.00


85,000.00 850.00 850.00
Total : 25,600.00 25,600.00

180,000.00 198,000.00 198,000.00


1,300.00 262,600.00 262,600.00
175,000.00 74,725.00 74,725.00
75,000.00 112,500.00 112,500.00
77,000.00 57,750.00 57,750.00
80,000.00 6,000.00 6,000.00
85,000.00 6,375.00 6,375.00
Total : 535,325.00 182,625.00 717,950.00

180,000.00 198,000.00 198,000.00


1,300.00 262,600.00 262,600.00
175,000.00 84,875.00 84,875.00
75,000.00 112,500.00 112,500.00
77,000.00 57,750.00 57,750.00
80,000.00 6,000.00 6,000.00
85,000.00 6,375.00 6,375.00
Total : 545,475.00 182,625.00 728,100.00

180,000.00 216,000.00 216,000.00


1,300.00 176,800.00 176,800.00
175,000.00 95,200.00 95,200.00
75,000.00 112,500.00 112,500.00
77,000.00 57,750.00 57,750.00
80,000.00 6,000.00 6,000.00
85,000.00 6,375.00 6,375.00
Total : 488,000.00 182,625.00 670,625.00

180,000.00 216,000.00 216,000.00


150,000.00 64,800.00 64,800.00
75,000.00 58,500.00 58,500.00
77,000.00 30,030.00 30,030.00
80,000.00 3,120.00 3,120.00
85,000.00 3,315.00 3,315.00
Total : 280,800.00 94,965.00 375,765.00

12 ± 2 )cm,w/c = 0,87
1,300.00 321,100.00 321,100.00
100.71 87,516.99 87,516.99
92.59 92,497.41 92,497.41
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 505,414.40 154,220.00 659,634.40
(12 ± 2 )cm,w/c = 0,72
1,300.00 388,700.00 388,700.00
100.71 80,467.29 80,467.29
92.59 94,164.03 94,164.03
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 567,631.32 154,220.00 721,851.32
(12 ± 2 )cm,w/c = 0,61
1,300.00 457,600.00 457,600.00
100.71 73,619.01 73,619.01
92.59 95,460.29 95,460.29
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 630,979.30 154,220.00 785,199.30

(12 ± 2 )cm,w/c = 0,52


1,300.00 536,900.00 536,900.00
100.71 68,583.51 68,583.51
92.59 94,534.39 94,534.39
20.00 4,300.00 4,300.00
75,000.00 123,750.00 123,750.00
77,000.00 21,175.00 21,175.00
80,000.00 2,240.00 2,240.00
85,000.00 7,055.00 7,055.00
Total : 704,317.90 154,220.00 858,537.90

175,000.00 159,250.00 159,250.00


175,000.00 94,500.00 94,500.00
1,300.00 197,600.00 197,600.00
75,000.00 123,750.00 123,750.00
85,000.00 6,800.00 6,800.00
77,000.00 19,250.00 19,250.00
80,000.00 2,000.00 2,000.00
Total : 451,350.00 151,800.00 603,150.00

7,000.00 73,500.00 73,500.00


17,500.00 2,625.00 2,625.00
75,000.00 5,250.00 5,250.00
77,000.00 5,390.00 5,390.00
80,000.00 560.00 560.00
85,000.00 340.00 340.00
Total 76,125.00 11,540.00 87,665.00
8,766.50

1,500,000.00 60,000.00 60,000.00


12,000.00 3,600.00 3,600.00
10,000.00 1,000.00 1,000.00
75,000.00 39,000.00 39,000.00
77,000.00 20,020.00 20,020.00
80,000.00 2,080.00 2,080.00
85,000.00 2,210.00 2,210.00
Total 64,600.00 63,310.00 127,910.00

1,500,000.00 60,000.00 60,000.00


12,000.00 3,600.00 3,600.00
10,000.00 1,000.00 1,000.00
75,000.00 39,000.00 39,000.00
77,000.00 20,020.00 20,020.00
80,000.00 2,080.00 2,080.00
85,000.00 2,210.00 2,210.00
Total 64,600.00 63,310.00 127,910.00

1,500,000.00 60,000.00 60,000.00


12,000.00 4,800.00 4,800.00
10,000.00 2,000.00 2,000.00
5,000,000.00 75,000.00 75,000.00
120,000.00 42,000.00 42,000.00
75,000.00 150,000.00 150,000.00
75,000.00 49,500.00 49,500.00
77,000.00 25,410.00 25,410.00
80,000.00 2,640.00 2,640.00
85,000.00 2,805.00 2,805.00
Total 333,800.00 80,355.00 414,155.00

1,500,000.00 60,000.00 60,000.00


12,000.00 4,800.00 4,800.00
10,000.00 2,000.00 2,000.00
5,000,000.00 90,000.00 90,000.00
120,000.00 42,000.00 42,000.00
75,000.00 150,000.00 150,000.00
75,000.00 49,500.00 49,500.00
77,000.00 25,410.00 25,410.00
80,000.00 2,640.00 2,640.00
85,000.00 2,805.00 2,805.00
Total 348,800.00 80,355.00 429,155.00

1,500,000.00 60,000.00 60,000.00


12,000.00 4,800.00 4,800.00
10,000.00 2,000.00 2,000.00
5,000,000.00 75,000.00 75,000.00
120,000.00 42,000.00 42,000.00
75,000.00 450,000.00 450,000.00
75,000.00 49,500.00 49,500.00
77,000.00 25,410.00 25,410.00
80,000.00 2,640.00 2,640.00
85,000.00 2,805.00 2,805.00
Total 633,800.00 80,355.00 714,155.00

1,500,000.00 45,000.00 45,000.00


12,000.00 4,800.00 4,800.00
10,000.00 1,500.00 1,500.00
5,000,000.00 75,000.00 75,000.00
120,000.00 42,000.00 42,000.00
75,000.00 150,000.00 150,000.00
75,000.00 49,500.00 49,500.00
77,000.00 25,410.00 25,410.00
80,000.00 2,640.00 2,640.00
85,000.00 2,805.00 2,805.00
Total 318,300.00 80,355.00 398,655.00
bekesting)
1,500,000.00 300,000.00 300,000.00
12,000.00 18,000.00 18,000.00
10,000.00 4,000.00 4,000.00
7,000.00 1,099,000.00 1,099,000.00
17,500.00 39,375.00 39,375.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
75,000.00 397,500.00 397,500.00
77,000.00 21,175.00 21,175.00
77,000.00 100,100.00 100,100.00
77,000.00 80,850.00 80,850.00
80,000.00 20,960.00 20,960.00
85,000.00 22,525.00 22,525.00
Total 2,133,425.00 643,110.00 2,776,535.00

1,500,000.00 405,000.00 405,000.00


12,000.00 24,000.00 24,000.00
10,000.00 6,000.00 6,000.00
7,000.00 1,470,000.00 1,470,000.00
17,500.00 52,500.00 52,500.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
75,000.00 423,750.00 423,750.00
77,000.00 21,175.00 21,175.00
77,000.00 120,120.00 120,120.00
77,000.00 107,800.00 107,800.00
80,000.00 25,840.00 25,840.00
85,000.00 24,055.00 24,055.00
Total 2,630,550.00 722,740.00 3,353,290.00

1,500,000.00 600,000.00 600,000.00


12,000.00 48,000.00 48,000.00
10,000.00 20,000.00 20,000.00
7,000.00 2,205,000.00 2,205,000.00
17,500.00 78,750.00 78,750.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 750,000.00 750,000.00
120,000.00 420,000.00 420,000.00
75,000.00 1,500,000.00 1,500,000.00
75,000.00 528,750.00 528,750.00
77,000.00 21,175.00 21,175.00
77,000.00 127,050.00 127,050.00
77,000.00 161,700.00 161,700.00
80,000.00 32,240.00 32,240.00
85,000.00 30,005.00 30,005.00
Total 6,294,800.00 900,920.00 7,195,720.00
+ bekesting)
1,500,000.00 480,000.00 480,000.00
12,000.00 38,400.00 38,400.00
10,000.00 16,000.00 16,000.00
7,000.00 770,000.00 770,000.00
17,500.00 39,375.00 39,375.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 600,000.00 600,000.00
120,000.00 336,000.00 336,000.00
75,000.00 2,400,000.00 2,400,000.00
75,000.00 397,500.00 397,500.00
77,000.00 21,175.00 21,175.00
77,000.00 100,100.00 100,100.00
77,000.00 80,850.00 80,850.00
80,000.00 21,200.00 21,200.00
85,000.00 22,525.00 22,525.00
Total 5,352,825.00 643,350.00 5,996,175.00
+ bekesting)
1,500,000.00 480,000.00 480,000.00
12,000.00 38,400.00 38,400.00
10,000.00 16,000.00 16,000.00
7,000.00 1,470,000.00 1,470,000.00
17,500.00 39,375.00 39,375.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 600,000.00 600,000.00
120,000.00 336,000.00 336,000.00
75,000.00 2,400,000.00 2,400,000.00
75,000.00 397,500.00 397,500.00
77,000.00 21,175.00 21,175.00
77,000.00 100,100.00 100,100.00
77,000.00 80,850.00 80,850.00
80,000.00 21,200.00 21,200.00
85,000.00 22,525.00 22,525.00
Total 6,052,825.00 643,350.00 6,696,175.00
+ bekesting)
1,500,000.00 480,000.00 480,000.00
12,000.00 38,400.00 38,400.00
10,000.00 16,000.00 16,000.00
7,000.00 1,102,500.00 1,102,500.00
17,500.00 39,375.00 39,375.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 600,000.00 600,000.00
120,000.00 336,000.00 336,000.00
75,000.00 2,400,000.00 2,400,000.00
75,000.00 397,500.00 397,500.00
77,000.00 21,175.00 21,175.00
77,000.00 100,100.00 100,100.00
77,000.00 80,850.00 80,850.00
80,000.00 21,200.00 21,200.00
85,000.00 22,525.00 22,525.00
Total 5,685,325.00 643,350.00 6,328,675.00

1,500,000.00 480,000.00 480,000.00


12,000.00 38,400.00 38,400.00
10,000.00 16,000.00 16,000.00
7,000.00 1,470,000.00 1,470,000.00
17,500.00 52,500.00 52,500.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 700,000.00 700,000.00
120,000.00 336,000.00 336,000.00
75,000.00 1,200,000.00 1,200,000.00
75,000.00 476,250.00 476,250.00
77,000.00 21,175.00 21,175.00
77,000.00 127,050.00 127,050.00
77,000.00 107,800.00 107,800.00
80,000.00 26,640.00 26,640.00
85,000.00 27,030.00 27,030.00
Total 4,965,950.00 785,945.00 5,751,895.00
1,500,000.00 375,000.00 375,000.00
12,000.00 36,000.00 36,000.00
10,000.00 12,000.00 12,000.00
7,000.00 1,470,000.00 1,470,000.00
17,500.00 52,500.00 52,500.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 525,000.00 525,000.00
120,000.00 300,000.00 300,000.00
75,000.00 1,050,000.00 1,050,000.00
75,000.00 423,750.00 423,750.00
77,000.00 21,175.00 21,175.00
77,000.00 120,120.00 120,120.00
77,000.00 107,800.00 107,800.00
80,000.00 25,840.00 25,840.00
85,000.00 24,055.00 24,055.00
Total 4,493,550.00 722,740.00 5,216,290.00
ekesting)
1,500,000.00 360,000.00 360,000.00
12,000.00 36,000.00 36,000.00
10,000.00 12,000.00 12,000.00
7,000.00 1,470,000.00 1,470,000.00
17,500.00 52,500.00 52,500.00
1,300.00 436,800.00 436,800.00
175,000.00 94,500.00 94,500.00
175,000.00 141,750.00 141,750.00
5,000,000.00 525,000.00 525,000.00
120,000.00 300,000.00 300,000.00
75,000.00 1,050,000.00 1,050,000.00
75,000.00 423,750.00 423,750.00
77,000.00 21,175.00 21,175.00
77,000.00 120,120.00 120,120.00
77,000.00 107,800.00 107,800.00
80,000.00 25,840.00 25,840.00
85,000.00 24,055.00 24,055.00
Total 4,478,550.00 722,740.00 5,201,290.00
1,500,000.00 3,000.00 3,000.00
12,000.00 120.00 120.00
7,000.00 21,000.00 21,000.00
17,500.00 787.50 787.50
1,300.00 5,200.00 5,200.00
175,000.00 1,050.00 1,050.00
175,000.00 1,575.00 1,575.00
75,000.00 13,500.00 13,500.00
77,000.00 1,540.00 1,540.00
77,000.00 1,540.00 1,540.00
77,000.00 1,540.00 1,540.00
80,000.00 480.00 480.00
85,000.00 765.00 765.00
Total 32,732.50 19,365.00 52,097.50

1,500,000.00 4,500.00 4,500.00


12,000.00 240.00 240.00
7,000.00 25,200.00 25,200.00
17,500.00 875.00 875.00
1,300.00 7,150.00 7,150.00
175,000.00 1,575.00 1,575.00
175,000.00 2,625.00 2,625.00
75,000.00 22,275.00 22,275.00
77,000.00 2,541.00 2,541.00
77,000.00 2,541.00 2,541.00
77,000.00 2,541.00 2,541.00
80,000.00 800.00 800.00
85,000.00 1,275.00 1,275.00
Total 42,165.00 31,973.00 74,138.00

1,410.00 98,700.00 98,700.00


1,300.00 24,635.00 24,635.00
175,000.00 6,650.00 6,650.00
75,000.00 22,500.00 22,500.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 1,275.00 1,275.00
Total : 129,985.00 32,275.00 162,260.00

1,410.00 98,700.00 98,700.00


1,300.00 18,681.00 18,681.00
175,000.00 7,000.00 7,000.00
75,000.00 22,500.00 22,500.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 1,275.00 1,275.00
Total : 124,381.00 32,275.00 156,656.00

1,410.00 98,700.00 98,700.00


1,300.00 12,584.00 12,584.00
175,000.00 7,875.00 7,875.00
75,000.00 22,500.00 22,500.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 1,275.00 1,275.00
Total : 119,159.00 32,275.00 151,434.00

140,000.00 154,000.00 154,000.00


1,300.00 15,275.00 15,275.00
175,000.00 6,125.00 6,125.00
75,000.00 20,250.00 20,250.00
77,000.00 10,395.00 10,395.00
80,000.00 1,080.00 1,080.00
85,000.00 1,147.50 1,147.50
Total : 175,400.00 32,872.50 208,272.50

2,700.00 33,750.00 33,750.00


1,300.00 9,750.00 9,750.00
175,000.00 4,725.00 4,725.00
7,000.00 13,650.00 13,650.00
75,000.00 24,000.00 24,000.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 1,275.00 1,275.00
Total : 61,875.00 33,775.00 95,650.00
125,000.00 195,000.00 195,000.00
1,300.00 14,794.00 14,794.00
175,000.00 7,350.00 7,350.00
13,000.00 19,500.00 19,500.00
85,000.00 1,020.00 1,020.00
80,000.00 960.00 960.00
77,000.00 9,240.00 9,240.00
75,000.00 18,000.00 18,000.00
Total : 236,644.00 29,220.00 265,864.00

31,200.00 195,000.00 195,000.00


1,300.00 12,740.00 12,740.00
175,000.00 7,350.00 7,350.00
13,000.00 16,900.00 16,900.00
85,000.00 1,105.00 1,105.00
80,000.00 1,040.00 1,040.00
77,000.00 9,625.00 9,625.00
75,000.00 18,750.00 18,750.00
Total : 231,990.00 30,520.00 262,510.00

70,397.11 195,000.00 195,000.00


1,300.00 12,480.00 12,480.00
175,000.00 7,350.00 7,350.00
13,000.00 19,500.00 19,500.00
85,000.00 1,020.00 1,020.00
80,000.00 960.00 960.00
77,000.00 9,240.00 9,240.00
75,000.00 18,000.00 18,000.00
Total : 234,330.00 29,220.00 263,550.00

35,135.14 195,000.00 195,000.00


1,300.00 12,090.00 12,090.00
175,000.00 3,150.00 3,150.00
13,000.00 6,500.00 6,500.00
85,000.00 2,550.00 2,550.00
80,000.00 3,600.00 3,600.00
77,000.00 34,650.00 34,650.00
75,000.00 45,000.00 45,000.00
Total : 216,740.00 85,800.00 302,540.00

70,397.11 195,000.00 195,000.00


1,300.00 12,480.00 12,480.00
175,000.00 7,350.00 7,350.00
13,000.00 19,500.00 19,500.00
85,000.00 1,020.00 1,020.00
80,000.00 960.00 960.00
77,000.00 9,240.00 9,240.00
75,000.00 18,000.00 18,000.00
Total : 234,330.00 29,220.00 263,550.00

6,000.00 7,500.00 7,500.00


1,300.00 1,482.00 1,482.00
175,000.00 525.00 525.00
13,000.00 1,300.00 1,300.00
85,000.00 425.00 425.00
80,000.00 720.00 720.00
77,000.00 6,930.00 6,930.00
75,000.00 6,750.00 6,750.00
Total : 10,807.00 14,825.00 25,632.00

85,000.00 235,450.00 235,450.00


1,300.00 12,090.00 12,090.00
175,000.00 3,150.00 3,150.00
13,000.00 6,500.00 6,500.00
85,000.00 1,020.00 1,020.00
80,000.00 960.00 960.00
77,000.00 9,240.00 9,240.00
75,000.00 18,000.00 18,000.00
Total : 257,190.00 29,220.00 286,410.00

1,300.00 13,291.20 13,291.20


175,000.00 3,500.00 3,500.00
75,000.00 22,500.00 22,500.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 850.00 850.00
Total : 16,791.20 36,100.00 52,891.20

1,300.00 10,108.80 10,108.80


175,000.00 4,025.00 4,025.00
75,000.00 22,500.00 22,500.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 1,275.00 1,275.00
Total : 14,133.80 36,525.00 50,658.80

1,300.00 6,739.20 6,739.20


175,000.00 4,550.00 4,550.00
75,000.00 22,500.00 22,500.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 1,275.00 1,275.00
Total : 11,289.20 36,525.00 47,814.20

1,300.00 4,225.00 4,225.00


75,000.00 15,000.00 15,000.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 850.00 850.00
Total : 4,225.00 24,350.00 28,575.00

35,500.00 35,500.00 35,500.00


16,800.00 168.00 168.00
75,000.00 12,000.00 12,000.00
77,000.00 12,320.00 12,320.00
80,000.00 1,280.00 1,280.00
85,000.00 212.50 212.50
Total : 35,668.00 25,812.50 61,480.50
6,500,000.00 7,800,000.00 7,800,000.00
9,000.00 135,000.00 135,000.00
13,000.00 72,800.00 72,800.00
75,000.00 502,500.00 502,500.00
77,000.00 1,547,700.00 1,547,700.00
80,000.00 96,000.00 96,000.00
85,000.00 17,000.00 17,000.00
Total : 8,007,800.00 2,163,200.00 10,171,000.00

10,000,000.00 11,000,000.00 11,000,000.00


13,000.00 16,250.00 16,250.00
40,000.00 40,000.00 40,000.00
75,000.00 525,000.00 525,000.00
77,000.00 1,617,000.00 1,617,000.00
80,000.00 168,000.00 168,000.00
85,000.00 29,750.00 29,750.00
Total : 11,056,250.00 2,339,750.00 13,396,000.00

10,000,000.00 145,000.00 145,000.00


13,000.00 650.00 650.00
75,000.00 7,500.00 7,500.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 425.00 425.00
Total : 145,650.00 24,925.00 170,575.00

18,500.00 20,350.00 20,350.00


77,000.00 3,850.00 3,850.00
80,000.00 400.00 400.00
75,000.00 3,750.00 3,750.00
85,000.00 255.00 255.00
Total : 20,350.00 8,255.00 28,605.00

10,000,000.00 400,000.00 400,000.00


40,000.00 20,000.00 20,000.00
75,000.00 75,000.00 75,000.00
77,000.00 231,000.00 231,000.00
80,000.00 24,000.00 24,000.00
85,000.00 4,250.00 4,250.00
Total : 420,000.00 334,250.00 754,250.00
10,000,000.00 240,000.00 240,000.00
90,000.00 90,000.00 90,000.00
40,000.00 12,000.00 12,000.00
75,000.00 60,000.00 60,000.00
77,000.00 184,800.00 184,800.00
80,000.00 19,200.00 19,200.00
85,000.00 3,400.00 3,400.00
Total : 342,000.00 267,400.00 609,400.00

90,000.00 99,000.00 99,000.00


75,000.00 1,125.00 1,125.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 68.00 68.00
Total : 99,000.00 13,943.00 112,943.00

200,000.00 220,000.00 220,000.00


75,000.00 1,125.00 1,125.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 68.00 68.00
Total : 220,000.00 13,943.00 233,943.00

10,000,000.00 120,000.00 120,000.00


14,000.00 2,100.00 2,100.00
75,000.00 8,250.00 8,250.00
77,000.00 8,470.00 8,470.00
80,000.00 880.00 880.00
85,000.00 467.50 467.50
Total : 122,100.00 18,067.50 140,167.50

10,000,000.00 60,000.00 60,000.00


14,000.00 2,100.00 2,100.00
75,000.00 8,250.00 8,250.00
77,000.00 8,470.00 8,470.00
80,000.00 880.00 880.00
85,000.00 467.50 467.50
Total : 62,100.00 18,067.50 80,167.50

10,000,000.00 140,000.00 140,000.00


13,000.00 1,950.00 1,950.00
14,000.00 420.00 420.00
75,000.00 3,750.00 3,750.00
77,000.00 3,850.00 3,850.00
80,000.00 400.00 400.00
85,000.00 170.00 170.00
Total : 142,370.00 8,170.00 150,540.00

70,000.00 73,500.00 73,500.00


13,000.00 1,950.00 1,950.00
14,000.00 420.00 420.00
75,000.00 3,750.00 3,750.00
77,000.00 3,850.00 3,850.00
80,000.00 400.00 400.00
85,000.00 170.00 170.00
Total : 75,870.00 8,170.00 84,040.00

70,000.00 77,000.00 77,000.00


13,000.00 650.00 650.00
75,000.00 37,500.00 37,500.00
77,000.00 38,500.00 38,500.00
80,000.00 4,000.00 4,000.00
85,000.00 2,125.00 2,125.00
Total : 77,650.00 82,125.00 159,775.00

35,000.00 36,750.00 36,750.00


14,000.00 1,400.00 1,400.00
77,000.00 3,850.00
80,000.00 400.00
75,000.00 3,750.00
85,000.00 255.00
Total : 38,150.00 8,255.00 46,405.00

29,000.00 30,450.00 30,450.00


75,000.00 11,250.00 11,250.00
77,000.00 3,850.00 3,850.00
80,000.00 400.00 400.00
85,000.00 680.00 680.00
Total : 30,450.00 16,180.00 46,630.00
gka Aluminium
18,150.00 65,340.00 65,340.00
23,000.00 3,450.00 3,450.00
15,000.00 15,750.00 15,750.00
45,100.00 67,650.00 67,650.00
75,000.00 37,500.00 37,500.00
77,000.00 38,500.00 38,500.00
80,000.00 4,000.00 4,000.00
85,000.00 2,125.00 2,125.00
Total : 152,190.00 82,125.00 234,315.00

110,000.00 40,040.00 40,040.00


14,000.00 1,540.00 1,540.00
75,000.00 22,500.00 22,500.00
77,000.00 26,950.00 26,950.00
80,000.00 2,800.00 2,800.00
85,000.00 1,275.00 1,275.00
Total : 41,580.00 53,525.00 95,105.00

4,500.00 112,500.00 112,500.00


75,000.00 11,250.00 11,250.00
77,000.00 4,620.00 4,620.00
80,000.00 480.00 480.00
85,000.00 680.00 680.00
Total : 112,500.00 17,030.00 129,530.00

6,500.00 32,500.00 32,500.00


1,300.00 10,400.00 10,400.00
75,000.00 30,000.00 30,000.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 170.00 170.00
Total : 42,900.00 47,170.00 90,070.00

110,000.00 42,900.00 42,900.00


75,000.00 20,250.00 20,250.00
77,000.00 30,800.00 30,800.00
80,000.00 3,200.00 3,200.00
85,000.00 1,147.50 1,147.50
Total : 42,900.00 55,397.50 98,297.50

10,000.00 12,500.00 12,500.00


8,750.00 21,875.00 21,875.00
8,750.00 17,500.00 17,500.00
15,000.00 1,650.00 1,650.00
35,000.00 3,500.00 3,500.00
5,000.00 8,350.00 8,350.00
80,000.00 29,120.00 29,120.00
8,000.00 7,440.00 7,440.00
1,000.00 1,000.00 1,000.00
75,000.00 7,500.00 7,500.00
77,000.00 3,850.00 3,850.00
80,000.00 400.00 400.00
85,000.00 425.00 425.00
Total : 102,935.00 12,175.00 115,110.00

17,000.00 17,000.00 17,000.00


13,000.00 195.00 195.00
6,500,000.00 123,500.00 123,500.00
75,000.00 3,000.00 3,000.00
77,000.00 30,800.00 30,800.00
80,000.00 2,000.00 2,000.00
85,000.00 85.00 85.00
Total : 140,695.00 35,885.00 176,580.00

6,500,000.00 45,500.00 45,500.00


13,000.00 1,300.00 1,300.00
15,000.00 2,250.00 2,250.00
75,000.00 45,000.00 45,000.00
77,000.00 138,600.00 138,600.00
80,000.00 14,400.00 14,400.00
85,000.00 2,550.00 2,550.00
Total : 49,050.00 200,550.00 249,600.00
25,000.00 30,000.00 30,000.00
8,750.00 8,750.00 8,750.00
75,000.00 2,700.00 2,700.00
77,000.00 4,620.00 4,620.00
80,000.00 480.00 480.00
85,000.00 153.00 153.00
Total : 38,750.00 7,953.00 46,703.00

25,000.00 30,000.00 30,000.00


8,750.00 8,750.00 8,750.00
75,000.00 4,050.00 4,050.00
77,000.00 6,930.00 6,930.00
80,000.00 720.00 720.00
85,000.00 229.50 229.50
Total : 38,750.00 11,929.50 50,679.50

100,000.00 120,000.00 120,000.00


35,000.00 35,000.00 35,000.00
75,000.00 6,075.00 6,075.00
77,000.00 10,395.00 10,395.00
80,000.00 1,080.00 1,080.00
85,000.00 348.50 348.50
Total : 155,000.00 17,898.50 172,898.50

32,125.00 124,323.75
143,350.00 21,502.50
156,656.00 1,644,888.00
50,658.80 531,917.40
28,575.00 300,037.50
603,150.00 90,472.50
3,353,290.00 422,514.54
721,851.32 216,555.40
250,000.00 250,000.00
100,000.00 100,000.00

32,125.00 23,451.25
143,350.00 11,611.35
175,000.00 28,350.00
30,000.00 30,000.00
Total : 3,795,624.19
21 PJ/SW 821 JP Komplit
1,000,000.00 1,000,000.00 1,000,000.00
60,000.00 60,000.00 60,000.00
75,000.00 247,500.00 247,500.00
77,000.00 84,700.00 84,700.00
80,000.00 80.00 80.00
85,000.00 13,600.00 13,600.00
Total : 1,060,000.00 345,880.00 1,405,880.00

450,000.00 450,000.00 450,000.00


1,300.00 7,800.00 7,800.00
175,000.00 1,750.00 1,750.00
75,000.00 75,000.00 75,000.00
77,000.00 115,500.00 115,500.00
80,000.00 120,000.00 120,000.00
85,000.00 13,600.00 13,600.00
Total : 459,550.00 324,100.00 783,650.00

650,000.00 650,000.00 650,000.00


39,000.00 39,000.00 39,000.00
1,300.00 7,800.00 7,800.00
175,000.00 1,750.00 1,750.00
75,000.00 75,000.00 75,000.00
77,000.00 77,000.00 77,000.00
80,000.00 8,000.00 8,000.00
85,000.00 8,500.00 8,500.00
Total : 698,550.00 168,500.00 867,050.00

600,000.00 600,000.00 600,000.00


72,000.00 72,000.00 72,000.00
1,300.00 780.00 780.00
175,000.00 1,750.00 1,750.00
75,000.00 90,000.00 90,000.00
77,000.00 111,650.00 111,650.00
80,000.00 12,000.00 12,000.00
85,000.00 8,500.00 8,500.00
Total : 674,530.00 222,150.00 896,680.00

275,000.00 275,000.00 275,000.00


49,500.00 49,500.00 49,500.00
75,000.00 135,000.00 135,000.00
77,000.00 207,900.00 207,900.00
80,000.00 43,200.00 43,200.00
85,000.00 9,350.00 9,350.00
Total : 324,500.00 395,450.00 719,950.00
are Flange"
200,000.00 200,000.00 200,000.00
75,000.00 750.00 750.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 200,000.00 9,675.00 209,675.00

150,000.00 150,000.00 150,000.00


1,500.00 37.50 37.50
75,000.00 750.00 750.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 150,037.50 9,675.00 159,712.50

250,000.00 250,000.00 250,000.00


75,000.00 750.00 750.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 250,000.00 9,675.00 259,675.00

150,000.00 150,000.00 150,000.00


75,000.00 750.00 750.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 150,000.00 9,675.00 159,675.00
800,000.00 800,000.00 800,000.00
48,000.00 48,000.00 48,000.00
1,300.00 7,800.00 7,800.00
175,000.00 1,750.00 1,750.00
75,000.00 75,000.00 75,000.00
77,000.00 77,000.00 77,000.00
75,000.00 7,500.00 7,500.00
85,000.00 8,500.00 8,500.00
Total : 857,550.00 168,000.00 1,025,550.00

225,000.00 225,000.00 225,000.00


27,000.00 27,000.00 27,000.00
75,000.00 2,250.00 2,250.00
77,000.00 23,100.00 23,100.00
75,000.00 2,250.00 2,250.00
85,000.00 127.50 127.50
Total : 252,000.00 27,727.50 279,727.50

59,000.00 8,850.00 8,850.00


29,000.00 1,450.00 1,450.00
4,100.00 410.00 410.00
16,800.00 168.00 168.00
75,000.00 12,000.00 12,000.00
77,000.00 12,320.00 12,320.00
80,000.00 1,280.00 1,280.00
85,000.00 212.50 212.50
Total : 10,878.00 25,812.50 36,690.50

55,500.00 8,325.00 8,325.00


55,500.00 20,646.00 20,646.00
4,100.00 820.00 820.00
16,800.00 168.00 168.00
75,000.00 12,000.00 12,000.00
77,000.00 12,320.00 12,320.00
80,000.00 1,280.00 1,280.00
85,000.00 212.50 212.50
Total : 29,959.00 25,812.50 55,771.50
12,000.00 1,200.00 1,200.00
43,600.00 4,360.00 4,360.00
30,000.00 7,800.00 7,800.00
75,000.00 1,500.00 1,500.00
77,000.00 4,851.00 4,851.00
80,000.00 504.00 504.00
85,000.00 212.50 212.50
Total : 13,360.00 6,855.00 20,427.50

70,500.00 21,150.00 21,150.00


16,800.00 168.00 168.00
75,000.00 450.00 450.00
77,000.00 4,620.00 4,620.00
80,000.00 960.00 960.00
85,000.00 510.00 510.00
Total : 21,318.00 6,540.00 27,858.00

35,200.00 3,520.00 3,520.00


16,800.00 168.00 168.00
75,000.00 15,000.00 15,000.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 850.00 850.00
Total : 3,688.00 32,850.00 36,538.00

60,000.00 12,000.00 12,000.00


16,800.00 420.00 420.00
75,000.00 1,875.00 1,875.00
77,000.00 19,250.00 19,250.00
80,000.00 2,000.00 2,000.00
85,000.00 850.00 850.00
Total : 12,420.00 23,975.00 36,395.00

200,000.00 220,000.00 220,000.00


18,150.00 81,675.00 81,675.00
25,000.00 6,750.00 6,750.00
75,000.00 15,000.00 15,000.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 85.00 85.00
Total : 88,425.00 32,085.00 340,510.00

35,000.00 35,000.00 35,000.00


75,000.00 1,125.00 1,125.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 85.00 85.00
Total : 35,000.00 13,960.00 48,960.00

35,000.00 35,000.00 35,000.00


75,000.00 750.00 750.00
77,000.00 7,700.00 7,700.00
80,000.00 800.00 800.00
85,000.00 85.00 85.00
Total : 35,000.00 9,335.00 44,335.00

15,000.00 15,000.00 15,000.00


75,000.00 1,125.00 1,125.00
77,000.00 11,550.00 11,550.00
80,000.00 1,200.00 1,200.00
85,000.00 85.00 85.00
Total : 15,000.00 13,960.00 28,960.00

20,000.00 20,000.00 20,000.00


75,000.00 750.00 750.00
77,000.00 38,500.00 38,500.00
80,000.00 800.00 800.00
85,000.00 425.00 425.00
Total : 20,000.00 40,475.00 60,475.00

145,200.00 145,200.00 145,200.00


75,000.00 1,500.00 1,500.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 85.00 85.00
Total : 145,200.00 18,585.00 163,785.00

100,000.00 100,000.00 100,000.00


75,000.00 1,500.00 1,500.00
77,000.00 15,400.00 15,400.00
80,000.00 1,600.00 1,600.00
85,000.00 85.00 85.00
Total : 100,000.00 18,585.00 118,585.00

65,870.00 65,870.00 65,870.00


75,000.00 37,500.00 37,500.00
77,000.00 19,250.00 19,250.00
80,000.00 2,000.00 2,000.00
85,000.00 2,125.00 2,125.00
Total : 65,870.00 60,875.00 126,745.00

RIAL INSTALASI GAS MEDIS

SATUAN VOL HARGA SATUAN JUMLAH

unit 1.00 1,500,000.00 1,500,000.00


lot 1.00 1,000,000.00 1,000,000.00

m 23.00 71,160.00 1,636,680.00


m 30.00 116,807.00 3,504,210.00
m 6.00 28,500.00 171,000.00
m 6.00 249,500.00 1,497,000.00
lot 1.00 750,000.00 750,000.00

Buah 5.00 1,900,000.00 9,500,000.00


Set 1.00 9,310,000.00 9,310,000.00

lot 1.00 750,000.00 750,000.00


lot 1.00 700,000.00 700,000.00
JUMLAH 30,318,890.00

Amlapura, 7 Mei 2015


Kontraktor,
PT. ASRI CIPTA NATHA ALAM

I NENGAH ASTRAWAN
DIREKTUR
7,500.000
RENCANA KERJA / TIME SCHEDULE
#REF! #REF!
#REF! #REF!
LOKASI #REF!
KONTRAK NOMOR : 71 / KNT. Bang / 2015
TANGGAL : 17 JUNI 2015
NILAI KONTRAK : 17.848.742.993,00
SPMK TGL / NOMOR : 17 JUNI 2015 / 72 / SPMK. Bang / 2015

BOBOT JUNI JULI AGUSTUS


NO URAIAN PEKERJAAN VOLUME (%) MING 1 MING 2 MING 3 MING 4 MING 5 MING 6 MING 7 MING 8
17-23 24-30 1-7 8-14 15-21 22-28 29-4 5-11
1 2 3 4 5
#REF! STRUKTUR SUB DAN LANTAI I LA
#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! 0.200 #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! -
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF!
S
#REF! #REF! P
#REF! #REF! #REF! #REF! #REF! M #REF!
K
#REF! #REF! 1
#REF! #REF! #REF! #REF! #REF! 7 #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
J
#REF! #REF! #REF! #REF! #REF! U #REF!
#REF! #REF! #REF! #REF! #REF! N #REF! #REF!
#REF! #REF! #REF! #REF! #REF! I
#REF! #REF!
2
#REF! #REF! 0
#REF! #REF! #REF! #REF! #REF! 1 #REF! #REF!
5
#REF! #REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF!

#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! STRUKTUR LANTAI II


#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!

#REF! STRUKTUR LANTAI III


#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF!
MINGGU INI #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
RENCANA :
KUMULATIF #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
MINGGU INI
REALISASI :
KUMULATIF

MENYETUJUI
PEJABAT PEMBUAT KOMITMEN / PPK.

(IR. I MADE MULIARTA.)


Pembina
Nip. 19650305 199302 1 001
WAKTU PELAKSANAAN 190 ( SERATUS SEMBILAN PULUH ) HARI KALENDER
AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
MING 9 MING 10 MING 11 MING 12 MING 13 MING 14 MING 15 MING 16 MING 17 MING 18 MING 19 MING 20 MING 21 MING 22 MING 23 MING 24 MING 25 MING 26 MING 27 MING 28
12-18 19-25 26-1 2-8 9-15 16-22 23-29 30-6 7-13 14-20 21-27 28-3 4-10 11-17 18-24 25-1 2-8 9-15 15-22 23

LANTAI 1
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!

#REF!
#REF!

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF!
#REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

LANTAI 2

#REF! #REF! #REF!


#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!

LANTAI 3

#REF! #REF! #REF!


#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!

DIPERIKSA PT. ASRI CIPTA NATHA ALAM


KONSULTAN PENGAWAS.
CV. LUMBUNG ASTI KONSULTAN

I WAYAN RETA,ST I DEWA GEDE ANOM PURWITA


Team Leader Project Manager
KET.

100%
FORMULIR REKAPITULASI PERHITUNGAN TINGKAT KOMPONEN DAL
(TKDN)

Nilai Gabungan Barang/Jasa (Rp)


Total
Uraian Pekerjaan
DN LN Ribu
Rp.
(1) (2) (3) (4)
Barang

I. Material Langsung (Bahan Baku) #REF! #REF!


II. Peralatan (Barang Jadi) -

A. Sub. Total Barang #REF! - #REF!


Jasa

III. Manajemen Proyek dan Rekayasaan #REF! #REF!


IV. Alat Kerja / fasilitas Kerja #REF! #REF!
V. Konstruksi dan Pabrikasi
VI. Jasa Umum

B. Sub. Total Jasa #REF! - #REF!


C. TOTAL Biaya (A+B) #REF! -

Formulasi Perhitungan:

Nilai Barang Total - Nilai Barang Luar Negeri


Nilai Gabungan Barang dan Jasa
% TKDN (Gabungan
=
Barang dan Jasa)
Nilai Jasa Total - Nilai Jasa Luar Negeri
Nilai Gabungan Barang dan Jasa
KAT KOMPONEN DALAM NEGERI

g/Jasa (Rp) % TKDN


Total
Barang/ Gabungan
% KDN
Jasa
(5) (6) (7)
Barang

100% #REF! #REF!


- - -

#REF!
Jasa

100% #REF! #REF!


100% #REF! #REF!

`
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali


LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali

TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org.


Pelaksana org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja org.
Mandor org.
Tukang Batu org.
Kepala Tukang Batu org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah - org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 08.00 - 12.00
08.00 - 12.00
12.00 - 13.00 12.00 - 13.00
13.00 - 17.00
13.00 - 17.00 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 35 org.
Mandor 1 org.
Tukang Batu - org.
Kepala Tukang Batu - org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 37 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1.00 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja - org.
Mandor 2 org.
Tukang Batu 16 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah 20 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1.00 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja - org.
Mandor 2 org.
Tukang Batu 16 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah 20 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR PERSONIL : PT. Recta Construction BAHAN ALAT PEKE
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja - org.
Mandor 1 org.
Tukang Batu 20 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 14 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik 1 org.
Tukang Besi 11 org.
Jumlah 53 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja - org.
Mandor 1 org.
Tukang Batu 16 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 16 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 14 org.
Jumlah 53 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali

LOKASI : Jalan Munduk Catu, No.8 Canggu - Bali


0 0
TANGGAL :
WAKTU PELAKSANAAN :
KONTRAKTOR : PT. Recta Construction
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja - org.
Mandor 2 org.
Tukang Batu - org.
Kepala Tukang Batu 1 org.
Tukang Kayu 13 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 10 org.
Jumlah 31 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN HARIAN

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi


Mahasiswa,

I Putu Chandra Wibawa


NIM : 1319151003
LAPORAN HARIAN

- Bali

Hari : Kamis
Tanggal : 30 Juli 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

- Bali

Hari : Jumat
Tanggal : 31 Juli 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

- Bali

Hari : Sabtu
Tanggal : 1 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

- Bali

Hari : Minggu
Tanggal : 2 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

- Bali

Hari : Senin
Tanggal : 3 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

- Bali

Hari : Selasa
Tanggal : 4 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 - Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPO

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali


LOKASI : : Jalan Munduk Catu, No.8 Canggu - Bali

TANGGAL :
WAKTU
:
PELAKSANAAN
KONTRAKTOR : PT. Recta Construction
I. JAM KERJA DAN TENAGA KERJA

Kep. Tukang Kayu


Kep. Tukang Batu
Pemb. Pelaksana

Kep. Tukang Las

Kep. Tukang Cat


Site Engineer

Tukang Kayu
Tukang Batu

Tukang Besi
Administrasi

Tukang Las
Pelaksana

Operator

Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA

Rabu 08.00 - 17.00


Kamis 08.00 - 17.00
Jumat 08.00 - 17.00
Sabtu 08.00 - 17.00
Minggu 08.00 - 17.00
Senin 08.00 - 17.00
Selasa 08.00 - 17.00

II. BAHAN - BAHAN


Minggu Lalu Minggu Ini
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah
Bahan Stok Bahan Bahan
Terpakai Terpakai
Masuk Masuk Ditolak
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah
Bahan Stok Bahan Bahan
Terpakai Terpakai
Masuk Masuk Ditolak

1 Triplek 4 mm lbr - - - - - -
2 Usuk Kruing m3 - - - - - -
3 Paku Reng kg - - - - - -
4 Paku Usuk kg - - - - - -
5 Cat Tembok kg - - - - - -
6 Plamir kg - - - - - -
7 Cat Meni Kayu kg - - - - - -
8 Cat Finishing Kayu kg - - - - - -
9 Amplas lbr - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - -
11 Plamir Kayu kg - - - - - -
12 Dempul kayu kg - - - - - -
13 Cat meni besi kg - - - - - -
14 Cat besi tahan karat kg - - - - - -
15 Koral beton m3 - - - - - -
16 Begesting m2 - - - - - -
17 Dempul besi kg - - - - - -
18 Batu Kali m3 - - - - - -
19 Semen PC zak - - - - - -
20 Pasir pasang m3 - - - - - -
21 Besi Beton kg - - - - - -
22 Kawat Beton kg - - - - - -
23 Koral beton m3 - - - - - -
24 Pasir Cor m3 - - - - - -
25 Pagar BRC unit - - - - - -
26 Mur baut bh - - - - - -
27 Tiang frame m - - - - - -
28 Pembesian bh - - - - - -
29 Lis Kayu bh - - - - - -
Diperiksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN MINGGUAN

III. KEMAJUAN PEKERJAAN


Jumlah. Target thd. Kontrak Realisasi Pelaksanaan

Satuan
No Uraian Pekerjaan s/d
Tenaga Dalam
Jam Efektif Volume Bobot (%) Minggu
Kerja Minggu Ini
Lalu

Penggunaa Stok Bahan


n Bahan s/d Akhir
Minggu Ini Minggu Ini
Penggunaa Stok Bahan
n Bahan s/d Akhir
Minggu Ini Minggu Ini

- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
JUMLAH -
MINGGU KE :7
TANGGAL : 29 Juli 2015
s.d. : 4 Agustus 2015

III. KEMAJUAN PEKERJAAN


Realisasi Pelaksanaan Prosentase thd Target

Ket.
s/d Per Bagian Tertimban
Minggu Ini Pek. (%) g (%)
-

Mahasiswa,

I Putu Chandra Wibawa


NIM : 1319151003
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 33 org.
Mandor 2 org.
Tukang Batu 18 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 55 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 33 org.
Mandor 2 org.
Tukang Batu 18 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 55 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 33 org.
Mandor 2 org.
Tukang Batu 18 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah 55 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 32 org.
Mandor 2 org.
Tukang Batu 17 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 15 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi 12 org.
Jumlah 81 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR PERSONIL : PT. Asih Cipta Natha Alam
BAHAN ALAT PEKE
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 37 org.
Mandor 2 org.
Tukang Batu 17 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 15 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik 1 org.
Tukang Besi 12 org.
Jumlah 90 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 39 org.
Mandor 1 org.
Tukang Batu 17 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 15 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik 1 org.
Tukang Besi 12 org.
Jumlah 91 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 38 org.
Mandor 2 org.
Tukang Batu 17 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 15 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik 1 org.
Tukang Besi 12 org.
Jumlah 91 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN HARIAN

Hari : Rabu
Tanggal : 5 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 #REF! Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Kamis
Tanggal : 6 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 #REF! Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Jumat
Tanggal : 7 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

0 m3 #REF! Abiansemal
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Sabtu
Tanggal : 8 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Kolom Praktis 1 : 2 : 3 m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Minggu
Tanggal : 9 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Kolom Praktis 1 : 2 : 3 m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Senin
Tanggal : 10 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Kolom Praktis 1 : 2 : 3 m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Selasa
Tanggal : 11 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Kolom Praktis 1 : 2 : 3 m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali


LOKASI : : Jalan Munduk Catu, No.8 Canggu - Bali
SURAT PERINTAH KERJA NOMOR 0
TANGGAL
WAKTU :
PELAKSA :
KONTRAK
NAAN : PT. Recta Construction
TOR
I. JAM KERJA DAN TENAGA KERJA

Kep. Tukang Kayu


Jumlah.

Kep. Tukang Batu


Pemb. Pelaksana

Kep. Tukang Las

Kep. Tukang Cat


Site Engineer

Tukang Kayu
Tukang Batu

Tukang Besi
Administrasi

Tukang Las
Pelaksana

Operator

Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja

Rabu 08.00 - 17.00 1 33 2 18 1 55


Kamis 08.00 - 17.00 1 33 2 18 1 55
Jumat 08.00 - 17.00 1 33 2 18 1 55
Sabtu 08.00 - 17.00 1 32 2 17 1 12 15 1 81
Minggu 08.00 - 17.00 1 37 2 17 1 12 15 1 3 89
Senin 08.00 - 17.00 1 39 2 17 1 12 15 1 3 91
Selasa 08.00 - 17.00 1 38 2 17 1 12 15 1 3 90

II. BAHAN - BAHAN


Minggu Lalu Minggu Ini
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak

1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
5 Cat Tembok kg - - - - - - -
6 Plamir kg - - - - - - -
7 Cat Meni Kayu kg - - - - - - -
8 Cat Finishing Kayu kg - - - - - - -
9 Amplas lbr - - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - - -
11 Plamir Kayu kg - - - - - - -
12 Dempul kayu kg - - - - - - -
13 Cat meni besi kg - - - - - - -
14 Cat besi tahan karat kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - 182.00 - 182.00 182.00
Diperiksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN MINGGUAN

MINGGU KE
TANGGAL

III. KEMAJUAN PEKERJAAN


Jumlah. Target thd. Kontrak Realisasi Pelaksanaan

Satuan
Jam No Uraian Pekerjaan s/d Minggu Dalam s/d
Volume Bobot (%)
Efektif Lalu Minggu Ini Minggu Ini

I Pekerjaan Beton
8 jam 1 Beton Rabat m3 #REF! 0.17 #REF! - #REF!
8 jam 2 Beton Bertulang Lantai Ground Tank (Fe.200 kg) m3 #REF! 0.05 #REF! - #REF!
8 jam 3 Beton Bertulang Lantai Kerja m3 #REF! 0.056 #REF! - #REF!
8 jam 4 Beton Bertulang Pondasi Plat Kaki (Fe.200 kg) m3 #REF! 2.851 #REF! - #REF!
8 jam 5 Beton Bertulang Sloof (Fe200 kg) m3 111.890 2.312 111.890 - 111.89
8 jam 6 m3 #REF! 4.336 - #REF! #REF!
8 jam 7 Beton Bertulang Kolom Praktis 1 : 2 : 3 m #REF! 0.101 - #REF! #REF!
8 Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 96.50 3.42 - - -
9 Beton Bertulang Balok Anak Lantai II (Fe.200 kg) m3 24.96 0.885 - - -
Stok 10 Beton Bertulang Balok Konsol Raam (Fe.200 kg) m3 4.68 0.165 - - -
Bahan 11 Beton Bertulang Dinding Ground Tank m3 100.28 3.706 - - -
Akhir 12 Beton Bertulang Plat Ground Tank m3 16.92 0.698 - - -
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 18.750

A. A Gede Budi San


MINGGU KE :8
: 5 Agustus 2015
s.d. : 11 Agustus 2015

II. KEMAJUAN PEKERJAAN


Prosentase thd Target

Ket.
Per Bagian Tertimban
Pek. (%) g (%)

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
100.0 2.312
#REF! #REF!
#REF! #REF!
- -
- -
- -
- -
- -
#REF!

Dibuat oleh,

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 36 org.
Mandor 2 org.
Tukang Batu 21 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 36 org.
Mandor 2 org.
Tukang Batu 21 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 36 org.
Mandor 2 org.
Tukang Batu 21 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 36 org.
Mandor 2 org.
Tukang Batu 21 org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR PERSONIL : PT. Asih Cipta Natha Alam
BAHAN ALAT PEKE
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 40 org.
Mandor 2 org.
Tukang Batu 22 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 16 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 14 org.
Jumlah 100 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org. 2
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 40 org.
Mandor 2 org.
Tukang Batu 22 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 18 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 15 org.
Jumlah 103 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 39 org.
Mandor 2 org.
Tukang Batu 21 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 15 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 14 org.
Jumlah 97 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN HARIAN

Hari : Rabu
Tanggal : 12 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 24.13 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Kamis
Tanggal : 13 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 24.13 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Jumat
Tanggal : 14 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 24.13 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Sabtu
Tanggal : 15 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 24.13 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Minggu
Tanggal : 16 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Anak Lantai II (Fe.200 kg) m3 24.96 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Senin
Tanggal : 17 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Balok Konsol Raam (Fe.200 kg) m3 4.68 Abiansemal


Beton Bertulang Dinding Ground Tank m3 2.40
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Selasa
Tanggal : 18 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

Beton Bertulang Plat Ground Tank m3 4.80 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN

PEKERJAAN : Proyek Pembangunan Hotel Eastin, Canggu - Bali


LOKASI : : Jalan Munduk Catu, No.8 Canggu - Bali
SURAT PERINTAH KERJA NOMOR 0
TANGGAL
WAKTU :
PELAKSA :
KONTRAK
NAAN : PT. Recta Construction
TOR
I. JAM KERJA DAN TENAGA KERJA

Kep. Tukang Kayu


Jumlah.

Kep. Tukang Batu


Pemb. Pelaksana

Kep. Tukang Las

Kep. Tukang Cat


Site Engineer

Tukang Kayu
Tukang Batu

Tukang Besi
Administrasi

Tukang Las
Pelaksana

Operator

Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja

Rabu 08.00 - 17.00 1 36 2 21 1 61


Kamis 08.00 - 17.00 1 36 2 21 1 61
Jumat 08.00 - 17.00 1 36 2 21 1 61
Sabtu 08.00 - 17.00 1 36 2 21 1 61
Minggu 08.00 - 17.00 1 40 2 22 1 14 16 1 3 100
Senin 08.00 - 17.00 1 40 2 22 1 15 18 1 3 103
Selasa 08.00 - 17.00 1 39 2 21 1 14 15 1 3 97

II. BAHAN - BAHAN


Minggu Lalu Minggu Ini
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak

1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
5 Cat Tembok kg - - - - - - -
6 Plamir kg - - - - - - -
7 Cat Meni Kayu kg - - - - - - -
8 Cat Finishing Kayu kg - - - - - - -
9 Amplas lbr - - - - - - -
10 Minyak Cat (Thinner) ltr - - - - - - -
11 Plamir Kayu kg - - - - - - -
12 Dempul kayu kg - - - - - - -
13 Cat meni besi kg - - - - - - -
14 Cat besi tahan karat kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - 182.00 - 182.00 182.00
Diperiksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN MINGGUAN

MINGGU KE
TANGGAL

III. KEMAJUAN PEKERJAAN


Jumlah. Target thd. Kontrak Realisasi Pelaksanaan

Satuan
Jam No Uraian Pekerjaan s/d Minggu Dalam s/d
Volume Bobot (%)
Efektif Lalu Minggu Ini Minggu Ini

I Pekerjaan Beton
8 jam 1 Beton Rabat m3 #REF! 0.17 #REF! - #REF!
8 jam 2 Beton Bertulang Lantai Ground Tank (Fe.200 kg) m3 #REF! 0.05 #REF! - #REF!
8 jam 3 Beton Bertulang Lantai Kerja m3 #REF! 0.056 #REF! - #REF!
8 jam 4 Beton Bertulang Pondasi Plat Kaki (Fe.200 kg) m3 #REF! 2.851 #REF! - #REF!
8 jam 5 Beton Bertulang Sloof (Fe200 kg) m3 111.890 2.312 111.890 - 111.89
8 jam 6 Beton Bertulang Kolom (Fe.300 kg) m3 #REF! 4.336 #REF! - #REF!
8 jam 7 Beton Bertulang Kolom Praktis 1 : 2 : 3 m #REF! 0.101 #REF! - #REF!
8 Beton Bertulang Balok Induk Lantai II (Fe.200 kg) m3 96.50 3.42 - 96.500 96.50
9 Beton Bertulang Balok Anak Lantai II (Fe.200 kg) m3 24.96 0.885 - 24.960 24.96
Stok 10 Beton Bertulang Balok Konsol Raam (Fe.200 kg) m3 4.68 0.165 - 4.680 4.68
Bahan 11 Beton Bertulang Dinding Ground Tank m3 2.40 0.154 - 2.400 2.40
Akhir 12 Beton Bertulang Plat Ground Tank m3 4.80 0.094 - 4.800 4.80
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
JUMLAH 14.594

A. A Gede Budi San


MINGGU KE :9
: 12 Agustus 2015
s.d. : 18 Agustus 2015

II. KEMAJUAN PEKERJAAN


Prosentase thd Target

Ket.
Per Bagian Tertimban
Pek. (%) g (%)

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
100.0 2.312
#REF! #REF!
#REF! #REF!
100.0 3.420
100.0 0.885
100.0 0.165
100.0 0.154
100.0 0.094
#REF!

Dibuat oleh,

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org. 2
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 32 org.
Mandor #REF! org.
Tukang Batu 20 org.
Kepala Tukang Batu #REF! org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah #REF! org.


CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 35 org.
Mandor 1 org.
Tukang Batu 22 org.
Kepala Tukang Batu 2 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.

Jumlah 61 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 46 org.
Mandor 2 org.
Tukang Batu #REF! org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah #REF! org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 58 org.
Mandor 2 org.
Tukang Batu #REF! org.
Kepala Tukang Batu 1 org.
Tukang Kayu org.
Kepala Tukang Kayu org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator org.
Mekanik org.
Tukang Besi org.
Jumlah #REF! org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR PERSONIL : PT. Asih Cipta Natha Alam
BAHAN ALAT PEKE
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 32 org.
Mandor 1 org.
Tukang Batu 20 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 16 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik 1 org.
Tukang Besi 12 org.
Jumlah 88 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org.
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 24 org.
Mandor 1 org.
Tukang Batu 16 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 18 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 15 org.
Jumlah 80 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN HARIAN

PEKERJAAN : Pekerjaan Pembangunan Gedung Pukesmas I Abiansemal

LOKASI : Kecamatan Abiansemal


SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL : 17 Juni 2015
WAKTU PELAKSANAAN : 190 Hari
KONTRAKTOR : PT. Asih Cipta Natha Alam
PERSONIL BAHAN ALAT PEKE
Jenis Bahan Jumlah yg
Keahlian Jumlah Jenis Jumlah No.
yang datang diterima Sat.

Site Engineer org. 1


Pelaksana 1 org. 2
Pembantu Pelaksana org.
Administrasi org.
Logistik org.
Pekerja 22 org.
Mandor 1 org.
Tukang Batu 12 org.
Kepala Tukang Batu 1 org.
Tukang Kayu 10 org.
Kepala Tukang Kayu 1 org.
Tukang Cat org.
Kepala Tukang Cat org.
Operator 3 org.
Mekanik org.
Tukang Besi 8 org.
Jumlah 59 org.
CUACA JAM KERJA JAM EFEKTIF
Antara jam Keadaan
08.00 - 12.00 Pagi 08.00 - 12.00
08.00 - 12.00 Terang
12.00 - 13.00 Istirahat 12.00 - 13.00 8 jam
13.00 - 17.00 Terang
13.00 - 17.00 Siang 13.00 - 17.00

Dipriksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN HARIAN

Hari : Rabu
Tanggal : 19 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m2 #REF! Abiansemal


#REF! m2 103.00
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Kamis
Tanggal : 20 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m2 221.80 Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Jumat
Tanggal : 21 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Sabtu
Tanggal : 22 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Minggu
Tanggal : 23 Agustus 2015
PEKERJAAN YANG DIKERJAKAN HARI INI
PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Senin
Tanggal : 24 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m3 #REF! Abiansemal


Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
LAPORAN HARIAN

s I Abiansemal

Hari : Selasa
Tanggal : 25 Agustus 2015

PEKERJAAN YANG DIKERJAKAN HARI INI

Jenis Pekerjaan Sat. Volume Lokasi

#REF! m3 #REF! Abiansemal


#REF! m3 #REF!
Dibuat oleh

A. A Gede Budi Sanjaya


Mahasiswa
PROGRAM STUDI TEKNIK SIPIL
FAKULTAS TEKNIK
UNIVERSITAS UDAYANA
LAPORAN
: Pekerjaan Pembangunan Gedung Pukesmas I
PEKERJAAN
Abiansemal
LOKASI : Kecamatan Abiansemal
SURAT PERINTAH KERJA NOMOR : 72/SPMK.Bang/2015
TANGGAL
WAKTU : 17 Juni 2015
PELAKSA : 190 Hari
KONTRAK
NAAN : PT. Asih Cipta Natha Alam
TOR
I. JAM KERJA DAN TENAGA KERJA

Kep. Tukang Kayu


Jumlah.

Kep. Tukang Batu


Pemb. Pelaksana

Kep. Tukang Las

Kep. Tukang Cat


Site Engineer

Tukang Kayu
Tukang Batu

Tukang Besi
Administrasi

Tukang Las
Pelaksana

Operator

Mekanik
Mandor
Pekerja
Logistik
HARI JAM KERJA Tenaga
Kerja

Rabu 08.00 - 17.00 1 32 1 20 1 55


Kamis 08.00 - 17.00 1 35 1 22 2 61
Jumat 08.00 - 17.00 1 46 2 15 1 65
Sabtu 08.00 - 17.00 1 58 2 13 1 75
Minggu 08.00 - 17.00 1 32 1 20 1 12 16 1 3 1 88
Senin 08.00 - 17.00 1 24 1 16 15 18 1 3 79
Selasa 08.00 - 17.00 1 22 1 12 1 8 10 1 3 59

II. BAHAN - BAHAN


Minggu Lalu Minggu Ini
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak
Penggunaa
No. Jenis Bahan Sat. Jumlah Jumlah Jumlah
Jumlah Jumlah n Bahan s/d
Bahan Stok Bahan Bahan
Terpakai Terpakai Minggu Ini
Masuk Masuk Ditolak

1 Triplek 4 mm lbr - - - - - - -
2 Usuk Kruing m3 - - - - - - -
3 Paku Reng kg - - - - - - -
4 Paku Usuk kg - - - - - - -
15 Koral beton m3 - - - - - - -
16 Begesting m2 - - - - - - -
17 Dempul besi kg - - - - - - -
18 Batu Kali m3 - - - - - - -
19 Semen PC zak - - - - - - -
20 Pasir pasang m3 - - - - - - -
21 Besi Beton kg - - - - - - -
22 Kawat Beton kg - - - - - - -
23 Koral beton m3 - - - - - - -
24 Pasir Cor m3 - - - - - - -
25 Pagar BRC unit - - - - - - -
26 Mur baut bh - - - - - - -
27 Tiang frame m - - - - - - -
28 Pembesian bh - - - - - - -
29 Lis Kayu bh - - - - - - -

Diperiksa oleh,
Dosen Pembimbing

Ir. I.G.P. Raka Purbanto, ST


NIP : 19620711 199803 1 001
LAPORAN MINGGUAN

MINGGU KE
TANGGAL

III. KEMAJUAN PEKERJAAN


Jumlah. Target thd. Kontrak Realisasi Pelaksanaan

Satuan
No Uraian Pekerjaan s/d
Jam Dalam s/d Minggu
Volume Bobot (%) Minggu
Efektif Minggu Ini Ini
Lalu

I Pekerjaan Beton
8 jam 1 #REF! #REF! #REF! #REF! #REF! #REF!
8 jam 2 #REF! M2 #REF! #REF! #REF! #REF!
8 jam 3 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 4 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 5 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 6 #REF! m3 #REF! #REF! #REF! #REF!
8 jam 7 #REF! m #REF! #REF! #REF! #REF!
8 #REF! m3 #REF! #REF! #REF! #REF!

Stok
Bahan
Akhir
Minggu Ini
Stok
Bahan
Akhir
Minggu Ini

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

JUMLAH #REF!

A. A Gede Budi San


MINGGU KE : 10
: 19 Agustus 2015
s.d. : 25 Agustus 2015

III. KEMAJUAN PEKERJAAN


Prosentase thd Target

Ket.
Per Bagian Tertimban
Pek. (%) g (%)

#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF!

Dibuat oleh,

A. A Gede Budi Sanjaya


Mahasiswa

Anda mungkin juga menyukai