NO BAHAN DASAR
1 2
A BAHAN DASAR
1 Batu Gunung / Kali
2 Batu Belah/ Chipping
3 Gorong2 Beton dia.80 cm
4 Gorong2 Beton dia.100 cm
5 Paving Block 6 cm
6 Paving Block 8 cm
7 Pasir
8 Timbunan Pilihan
9 Batu Bata
10 Bambu
11 Portland Semen
* Merk Tonasa
* Mer Bosowa
12 Kerikil
Semen Putih ( 20 kg/zak )
B BAHAN BESI
1 Besi Beton
2 Besi Beton Ǿ 5
3 Besi Beton Ǿ 6
4 Besi Beton Ǿ 8
5 Besi Beton Ǿ 10
6 Besi Beton Ǿ 12
7 Besi Beton Ǿ 14
8 Besi Beton Ǿ 16
9 Besi Beton Ǿ 18
10 Besi Beton Ǿ 20
11 Besi Beton Ǿ 22
12 Kawat Beton
13 Kawat Duri
14 Kawat Ram
15 Mur/Baut diameter 20 mm
16 Mur/Baut diameter 25 mm
17 Mur/Baut diameter 18 mm
18 Mur/Baut diameter 10 mm
19 Beugel U.40.40 mm
20 Beugel Strip 40.40 mm
21 Paku Gording panjang . 5 cm
5 Paku Biasa 6-10 cm
6 Paku Biasa 2-5 cm
7 Paku Seng Biasa
8 Paku Beton
9 Paku Asbes
10 Paku Les
11 Trali Naco (Besi Batangan)
12 Rangka Naco/Batang
D. BAHAN KAYU
1 Kayu Kelas I Jenis ULIN
Balok
Papan
2 Kayu Kelas I Jenis BAYAM
Balok
Papan
3 Kayu Kelas II Jenis Kapur
Balok
Papan
4 Kayu Kelas II
Balok
Papan
5 Les Kayu Plafond 1 x 4 cm kls II
6 Lem Kayu
E BAHAN ATAP
1 Seng Gelombang BWG 32" BJLS 0,25 mm
2 Seng BWG 33" BJLS 0,20 mm
3 Bumbungan Seng 90 x 180 cm
4 Seng Plat BWG 28"
5 Seng Spandek 0,3
6 Seng Spandek 0,3 Warna
7 Seng Spandek 0,35
8 Seng Spandek 0,35 Warna
9 Seng Spandek 0,4
10 Seng Spandek 0,4 Wana
11 Seng Gelombang BWG 33"
12 Karet Talang
13 Multi Roof
14 Nok Multi Roof
15 Surya Roof
16 Nok Surya Roof
17 Main Trus C 85
18 Reng U Type 41
19 Screw Spandek
20 Screw 12-14x20
21 Screw 10 - 16 x 16
22 Baaut Dinabolt
F BAHAN KACA
1 Kaca Bening Tebal 3 mm
2 Kaca Bening Tebal 5 mm
H BAHAN CAT
1 Cat Meni Kayu/Besi
2 Minyak Bekisting
3 Cat Kayu
4 Cat Besi Merk Avian
5 Minyak Cat ( afduner )
6 Kertas Gosok ( amplas )
7 Cat Tembok
8 Bahan Anti Rayap
9 Rol
10 Clear
11 Plamur
12 Politur
13 Dempul
14 Cat Tembok "Aries"
15 Cat Tembok "Maritex"
16 Cat Tembok "Avitex"
I. BAHAN SANITASI
1 Floor Drain
2 Dol Penguras
3 Closed Jongkok
4 Closed Jongkok
5 Closed Duduk
6 Closed Duduk
7 Urinoir Keramik
8 Waestapel
9 Waestapel
10 Pipa PVC Type D Diameter 4"
11 Pipa PVC Type D Diameter 3"
12 Pipa PVC Type D Diameter 2"
13 Pipa PVC Type D Diameter 3/4"
14 Pipa PVC Type D Diameter 1/2"
15 Pipa PVC Type AW Diameter 4"
16 Pipa PVC Type AW Diameter 3"
17 Pipa PVC Type AW Diameter 2"
18 Pipa PVC Type AW Diameter ¾"
19 Pipa PVC Type AW Diameter ½"
20 Kran Air 1/2" Merek Amico
21 Kran Air 3/4" Merek Amico
22 Sambungan T dan L PVC Dia. 2"
23 Sambungan L 4"
24 Sambungan L 3"
25 Pas. Sambungan Elbo 3/4"
26 Pas. Sambungan Elbo 1/2"
27 Pas. Sambungan T 1/2"
28 Pas. Sambungan T 3/4"
29 Sambungan T 4"
30 Sambungan T 3"
31 Pas. Socket 3/4"
32 Pas. Sambungan Lurus 1/2"
33 Lem Pipa @45 gram
34 Pompa Air Penampungan Air Excel
35 Pompa Air Shimizu
36 Pelampung Air ONDA
37 Radar Sintung Otomatis Air
38 Tower Penampungan Air T=5,60 m LA=2 m2 B=3 m2
J BAHAN LISTRIK
1 Sekring Kas 2 Grup
2 Saklar Tunggal
3 Saklar Ganda
4 Saklar Tiga
5 Stop Kontak
6 Lampu SL 20 Watt
7 Lampu SL 15 Watt
8 Pintting Lampu Pijar
9 Lampu Pijar 18 Watt "Philips"
10 Lampu Pijar 15 Watt "Philips"
11 Lampu Pijar 40 Watt "Philips"
12 Pipa Pengaman Kabel
13 Kabel NYM 2 x 2.5 mm2
14 Kabel NYM 3 x 2.5 mm2
L
1 Sirtu
2 Aspal Bitumen
3 Minyak Tanah Industri
4 Karet Elastomerit
5 Plastik Alas Cor
6 Minyak Pelumas
7 Bronjong jadi 2,7 mm
M³ 157,143
M³ 325,000
M' 200,000
M' 240,000
Bj 1,600
2,000
M³ 157,143
M³ 35,000
Buah 650
uk.9x19x39 cm Btg 20,000
batu belah pondasi
Kg 1,200
Kg 1,125
M³ 128,000
Kg 3,600
Kg 11,000
Btg 22,000
Btg 30,400
Btg 54,050
Btg 80,500
Btg 115,000
Btg 166,750
Btg 201,300
Btg 166,100
Btg 188,400
Btg 211,700
kg 20,000
roll 175,000
M³ 28,800
Kg 7,200
bh 7,200
bh 6,500
bh 5,000
bh 27,200
bh 22,600
kg 27,900
kg 23,000
kg 25,000
kg 50,000
dos 28,750
kg 45,000
kg 20,700
btg 30,400
daun 20,500
dos 76,000
dos 160,000
dos 60,800
dos 65,800
dos 57,700
dos 65,800
Buah 10,700
biji 2,700
lbr 55,700
Buah 27,000
Buah 20,000
Buah 15,000
M3 13,000,000
M 3
13,500,000
M3 12,000,000
M3 12,500,000
M3 7,000,000
M 3
7,500,000
M3 2,000,000
M 3
2,500,000
M' 5,800
Kg 10,000
lbr 90,300
kaki 9,030
lbr 50,000
lbr 113,200
mtr 40,000
mtr 45,000
mtr 50,000
m 47,500
mtr 52,500
mtr 57,500
kaki 9,800
m 15,000
lbr 85,000
lbr 27,000
lbr 49,000
lbr 39,000
btg 50,300
btg 79,100
dos 65,000
Biji 600
Biji 500
Biji 5,000
M2 45,000
M 2
175,000
Buah 110,000
Pasang 20,300
Buah 25,300
Buah 20,300
Buah 22,600
Pasang 15,000
Buah 10,000
Buah 11,550
Buah 35,000
Kg 27,000
liter 25,000
Kg 58,000
Kg 63,250
Ltr 28,000
Lbr 8,000
kg 65,000
kg/ltr 33,000
buah 25,000
kaleng 63,250
kg 60,800
kg 65,800
kg 35,500
4kg 41,000
kg 66,000
5kg 110,000
Buah 20,000
Buah 15,000
Buah 350,000
Buah 1,050,000
Buah 900,000
Buah 375,000
Buah 500,000
set 1,750,000
Set 450,000
Batang 150,000
Batang 90,000
Batang 65,000
Batang 28,000
Batang 21,000
Batang 260,000
Batang 175,000
Batang 85,000
Batang 30,000
Batang 25,000
Buah 28,800
Buah 35,000
Buah 9,200
Buah 25,000
Buah 13,000
Buah 3,000
Buah 2,500
Buah 3,000
Buah 4,000
Buah 25,000
Buah 13,000
Buah 3,000
Buah 3,000
Tube 65,000
Buah 2,500,000
unit 1,485,000
unit 166,000
buah 74,000
unit 7,500,000
Buah 26,200
Broco Buah 21,300
Broco Buah 26,500
Buah 30,000
Buah 33,000
Buah 52,800
Buah 49,000
Buah 22,600
Buah 45,300
Buah 47,600
Buah 75,500
Batang 12,100
m 10,500
m 14,740
Lembar 45,000
Lembar 55,000
Lembar 70,000
Lembar 80,000
Lembar 120,000
Lembar 55,000
M2 75,000
M3 115,000
Kg 13,700
Liter 14,000
Buah 2,063,200
M2 4,700
Ltr 64,700
Kg 280,000
Org/Hr 103,000
Org/Hr 108,000
Org/Hr 79,000
Org/Hr 103,000
Org/Hr 92,000
Org/Hr 105,000
Org/Hr 78,000
Org/Hr 70,500
Org/Hr 110,500
Org/Hr 70,500
Org/Hr 67,000
Org/Hr 67,000
Org/Hr 68,050
Org/Hr 68,050
REKAPITULASI VOLUME PEKERJAAN
II PEKERJAAN TANAH
2.1 Pekerjaan Galian Tanah m3
2.2 Pekerjaan Urugan Tanah Kembali m3
2.3 Pekerjaan Urugan Pasir m3
2.4 Pekerjaan Tanah Timbunan m3
IV PEKERJAAN DINDING
4.1 Pasangan Dinding 1/2 Bata Merah m2
VI PEKERJAAN KAYU
6.1 Pasang Kusen Pintu dan Jendela m3
6.2 Pasang Panel Pintu m2
X PEKERJAAN SANITASI
10.1 Memasang 1 bh Kloset Duduk bh
10.2 Memasang 1 bh Kran Air bh
10.3 Memasang 1 bh Bak Cuci Piring bh
10.4 Memasang 1 bh westafel bh
10.5 Memasang 1 m Pipa Penyalur Limbah Cair m
10.6 Memasang 1 m Pipa Penyalur Limbah Padat m
10.7 Memasang 1 m Pipa Penyalur Air Bersih bh
10.8 Memasang 1 bh Bak kontrol batu bata bh
10.9 Memasang 1 bh Tandon air bh
10.10 Pekerjaan Septictank & Bak Peresapan
a.Volume Galian Tanah m3
b.Volume Pasir Urug m3
c.Volume Batu Kali m3
d.Volume Pasang Dinding 1/2 Bata m2
e.Volume Plesteran m2
f.Volume Pelat Beton m3
g.Volume Pembesian
besi 8 kg
besi 10 kg
h.Volume Bekisting m2
VOLUME KET.
150
42
135.177
45.059
7.868
13.775
42.76
17.8
537.186
1074.372
1074.372
2.581
13.35
1.44
7.04
49.236
274.76
43.52
4.478
204.58
532.524
44.78
5.18
237.853
859.139
5.1777
2.069
116.794
333.608
27.588 374.4
4.478
204.58
532.524
44.78
14.625
1,052.76
92.5
66
161.286
156.992
48.4
1.42
2.20
7.11
82.91
11.54
216.53
216.53
9.4
176.75
179.3
3
6
1
1
48.64
35.06
34.36
1
1
6.22
0.97
0.76 (2.03+0.05+0.05)*14))*
19.53
19.53
0.414
2.90
18.40
2.87
111.84
3.75
6
39
41
4
5
3
3
18
18
14
52.128
177.25
18.25
10.25
36.68
66.77
66.77
1074.372
12
8
2
9
11
4
1
2
ANALISA HARGA SATUAN
I PEKERJAAN PERSIAPAN
1.1 1 m2 Pembersihan Lahan dan Perataan
Kebutuhan Satuan
Pekerja OH
Tenaga kerja
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang Kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
II PEKERJAAN TANAH
2.1 Menggali 1 m3 tanah biasa sedalam 2 meter
Kebutuhan Satuan
Pekerja OH
Tenaga kerja
Mandor OH
Jumlah harga per-satuan
Pekerja OH
Tenaga kerja
Mandor OH
Jumlah harga per-satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Batu Gunung/Kali m3
Bahan Portland Cement (PC) kg
Pasir pasang (PP) m3
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Jumlah harga per-satuan
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
IV PEKERJAAN DINDING
4.1 Memasang 1 m2 dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata,
campuran spesi 1 PC : 5 PP
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
VI PEKERJAAN KAYU
6.1 Membuat dan memasang 1 m 3 kusen pintu dan kusen jendela, kayu kelas II a
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
7.1 Membuat 1 m3 lantai kerja beton mutu f'c = 7,4 MPa (K 100), slump (3 - 6) cm,
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
7.2 Membuat 1 m3 beton mutu f'c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,
Kebutuhan Satuan
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Jumlah harga per-satuan
Kebutuhan Satuan
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tenaga kerja
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Atap spandek m2
Bahan
Screw spandek bh
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Jumlah harga per-satuan
Kebutuhan Satuan
Nok spandek m1
Bahan
Screw spandek bh
Pekerja OH
Tukang besi OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
X PEKERJAAN SANITASI
10.1 Memasang 1 buah kloset duduk
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Kran air bh
Bahan
Sealtape bh
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Bak cuci piring buah
Bahan
perlengkapan 35% set
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
westafel buah
Bahan
perlengkapan 35% set
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Bata merah bh
Semen portland kg
Bahan Pasir pasang m3
Pasir beton m3
Kerikil m3
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang Pipa OH
Tenaga kerja
Tenaga kerja
Kepala Tukang OH
Mandor OH
Kebutuhan Satuan
Lump Sum m2
Jumlah harga per-satuan
Kebutuhan Satuan
Pekerja OH
Tukang Besi OH
Tenaga kerja Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kebutuhan Satuan
Kaca tebal 5 mm m2
Bahan
Sealant kg
Pekerja OH
Tukang kayu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Jumlah harga per-satuan
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang batu OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Dempul kayu kg
Bahan Minyak cat kg
Kertas amplas lbr
Pekerja OH
Tukang cat OH
Tenaga kerja
Kepala tukang OH
Mandor OH
14.2 Mengecat 1 m2 permukaan kayu baru ( 1 alpis plamur, 1 lapis cat dasar, 2 lap
Kebutuhan Satuan
14.3 Mengecat 1 m2 tembok baru ( 1 alpis plamur, 1 lapis cat dasar, 2 lapis cat pen
Kebutuhan Satuan
Plamuur kg
Cat dasar kg
Cat penutup 2x kg
Pekerja OH
Tukang cat OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang Listrik OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang Listrik OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tenaga kerja Tukang Listrik OH
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Kabel NYM 2 x 2,5 mm m
Bahan Stopkontak bh
Pipa listrik m
Pekerja OH
Tukang Listrik OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tenaga kerja Tukang Listrik OH
Kepala tukang OH
Mandor OH
Kebutuhan Satuan
Pekerja OH
Tukang Listrik OH
Tenaga kerja
Kepala tukang OH
Mandor OH
Pekerja OH
Tukang Listrik OH
Tenaga kerja
Kepala tukang OH
Mandor OH
15.8 Memasang 1 buah Meteran Box /kWh meter 900 Watt (Token Prabayar)
Kebutuhan Satuan
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.100 92,000 9,200
0.050 103,000 5,150
14,350
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.012 2,000,000 24,000
0.020 25,000 500
0.007 2,500,000 17,500
42,000
0.100 92,000 9,200
0.100 92,000 9,200
0.010 103,000 1,030
0.005 103,000 515
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.900 92,000 82,800
0.045 103,000 4,635
Jumlah harga per-satuan pekerjaan 87,435
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.500 92,000 46,000
0.050 103,000 5,150
Jumlah harga per-satuan pekerjaan 51,150
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 157,143 188,572
0.300 92,000 27,600
0.010 103,000 1,030
Jumlah harga per-satuan pekerjaan 217,202
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 35,000 42,000
0.500 92,000 46,000
0.050 103,000 5,150
Jumlah harga per-satuan pekerjaan 93,150
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 157,143 188,572
202.000 1,125 227,250
0.485 157,143 76,214
492,036
1.500 92,000 138,000
0.750 92,000 69,000
0.075 103,000 7,725
0.075 103,000 7,725
222,450
Jumlah harga per-satuan pekerjaan 714,486
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 157,143 188,572
0.432 157,143 67,886
256,457
0.780 92,000 71,760
0.390 92,000 35,880
0.039 103,000 4,017
0.039 103,000 4,017
115,674
Jumlah harga per-satuan pekerjaan 372,131
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
70.000 650 45,500
8.320 1,125 9,360
0.049 157,143 7,700
62,560
0.300 92,000 27,600
0.100 92,000 9,200
0.010 103,000 1,030
0.015 103,000 1,545
39,375
Jumlah harga per-satuan pekerjaan 101,935
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
4.416 1,125 4,968
0.027 157,143 4,243
9,211
0.300 92,000 27,600
0.150 92,000 13,800
0.015 103,000 1,545
0.015 103,000 1,545
44,490
Jumlah harga per-satuan pekerjaan 53,701
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
3.250 1,125 3,656
3,656
0.200 92,000 18,400
0.100 92,000 9,200
0.010 103,000 1,030
0.010 103,000 1,030
29,660
Jumlah harga per-satuan pekerjaan 33,316
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 7,000,000 8,400,000
1.250 23,000 28,750
1.000 10,000 10,000
8,438,750
6.000 92,000 552,000
18.000 92,000 1,656,000
1.800 103,000 185,400
0.300 103,000 30,900
2,424,300
Jumlah harga per-satuan pekerjaan 10,863,050
kayu kelas I atau II
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.040 12,500,000 500,000
0.500 10,000 5,000
505,000
1.000 92,000 92,000
3.000 92,000 276,000
0.300 103,000 30,900
0.050 103,000 5,150
404,050
Jumlah harga per-satuan pekerjaan 909,050
kg/m3
kg/m3
%
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
230 1,125 258,750
893 112 100,235
1027 95 97,375
215 100 21,500
477,860
1.200 92,000 110,400
0.200 92,000 18,400
0.020 103,000 2,060
0.060 103,000 6,180
137,040 1045574.767
Jumlah harga per-satuan pekerjaan 614,900
Harga Satuan
Jumlah
Indeks Bahan/Upah
Indeks
(Rp) (Rp)
371 1,125 417,375
698 112 78,347
1047 95 99,271
215 100 21,500
616,493
1.650 92,000 151,800
0.275 92,000 25,300
0.028 103,000 2,884
0.083 103,000 8,549
188,533
Jumlah harga per-satuan pekerjaan 805,026
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.500 11,429 120,000
0.150 20,000 3,000
123,000
0.0700 92,000 6,440
0.0700 92,000 6,440
0.0070 103,000 721
0.0040 103,000 412
14,013
Jumlah harga per-satuan pekerjaan 137,013
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.500 11,403 119,731
0.150 20,000 3,000
122,731
0.070 92,000 6,440
0.070 92,000 6,440
0.007 103,000 721
0.004 103,000 412
14,013
Jumlah harga per-satuan pekerjaan 13,674
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.500 10,878 114,223
0.150 20,000 3,000
117,223
0.070 92,000 6,440
0.070 92,000 6,440
0.007 103,000 721
0.004 103,000 412
14,013
Jumlah harga per-satuan pekerjaan 13,124
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.500 7,523 78,995
0.150 20,000 3,000
81,995
0.070 92,000 6,440
0.070 92,000 6,440
0.007 103,000 721
0.004 103,000 412
14,013
Jumlah harga per-satuan pekerjaan 9,601
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.040 2,500,000 100,000
0.300 23,000 6,900
0.100 25,000 2,500
109,400
0.520 92,000 47,840
0.260 92,000 23,920
0.026 103,000 2,678
0.026 103,000 2,678
77,116
Jumlah harga per-satuan pekerjaan 186,516
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.045 2,500,000 112,500
0.300 23,000 6,900
0.100 25,000 2,500
121,900
0.520 92,000 47,840
0.260 92,000 23,920
0.026 103,000 2,678
0.026 103,000 2,678
77,116
Jumlah harga per-satuan pekerjaan 199,016
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.040 2,500,000 100,000
0.400 23,000 9,200
0.200 25,000 5,000
0.015 2,000,000 30,000
0.350 120,000 42,000
2.000 20,000 40,000
226,200
0.660 92,000 60,720
0.330 92,000 30,360
0.033 103,000 3,399
0.033 103,000 3,399
97,878
Jumlah harga per-satuan pekerjaan 324,078
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.040 2,500,000 100,000
0.400 23,000 9,200
0.200 25,000 5,000
0.018 2,000,000 36,000
0.350 120,000 42,000
2.000 20,000 40,000
232,200
0.660 92,000 60,720
0.330 92,000 30,360
0.033 103,000 3,399
0.033 103,000 3,399
97,878
Jumlah harga per-satuan pekerjaan 330,078
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.040 2,500,000 100,000
0.400 23,000 9,200
0.200 25,000 5,000
0.015 2,000,000 30,000
0.350 120,000 42,000
6.000 20,000 120,000
306,200
0.660 92,000 60,720
0.330 92,000 30,360
0.033 103,000 3,399
0.033 103,000 3,399
97,878
Jumlah harga per-satuan pekerjaan 404,078
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.030 2,500,000 75,000
0.400 23,000 9,200
0.150 25,000 3,750
0.015 2,000,000 30,000
0.350 120,000 42,000
2.000 20,000 40,000
199,950
0.660 92,000 60,720
0.330 92,000 30,360
0.033 103,000 3,399
0.033 103,000 3,399
97,878
Jumlah harga per-satuan pekerjaan 297,828
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp) 0.074
3 6,667 20,000 0.106
6.000 1,950 11,700 0.027
0.600 5,000 3,000 0.047
1.200 79,100 94,920
129,620
0.200 92,000 18,400
0.450 92,000 41,400
0.010 103,000 1,030
0.060 103,000 6,180
67,010
Jumlah harga per-satuan pekerjaan 196,630
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.050 57,500 60,375
0.020 186 4
60,379
0.150 92,000 13,800
0.075 92,000 6,900
0.080 103,000 8,240
0.006 103,000 618
29,558
Jumlah harga per-satuan pekerjaan 89,937
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.100 85,000 93,500
0.040 186 7
93,507
0.100 92,000 9,200
1.000 92,000 92,000
0.010 103,000 1,030
0.050 103,000 5,150
107,380
Jumlah harga per-satuan pekerjaan 200,887
an + Rangka Plafond
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
4 9,833 39,332
0.150 39,332 5,900
0.150 5,000 750
0.150 200 30
0.150 2,750 413
0.150 75,000 11,250
0.150 23,000 3,450
61,124
0.350 92,000 32,200
0.350 92,000 32,200
0.035 103,000 3,605
0.018 103,000 1,854
69,859
Jumlah harga per-satuan pekerjaan 130,983
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.375 13,000 4,875
0.150 2,750 413
5,288
0.060 92,000 5,520
0.060 92,000 5,520
0.006 103,000 618
0.003 103,000 309
11,967
Jumlah harga per-satuan pekerjaan 17,255
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 900,000 900,000
900,000
3.300 92,000 303,600
1.100 92,000 101,200
0.010 103,000 1,030
0.160 103,000 16,480
422,310
Jumlah harga per-satuan pekerjaan 1,322,310
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 28,800 28,800
0.025 5,000 125
28,925
0.010 92,000 920
0.400 92,000 36,800
0.040 103,000 4,120
0.005 103,000 515
42,355
Jumlah harga per-satuan pekerjaan 71,280
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 465,000 465,000
1.000 465,000 465,000
930,000
0.030 92,000 2,760
0.300 92,000 27,600
0.030 103,000 3,090
0.015 103,000 1,545
34,995
Jumlah harga per-satuan pekerjaan 964,995
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 450,000 450,000
0.120 450,000 54,000
504,000
1.200 92,000 110,400
1.450 92,000 133,400
0.150 103,000 15,450
0.060 103,000 6,180
265,430
Jumlah harga per-satuan pekerjaan 769,430
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 65,000 78,000
0.350 78,000 27,300
0.680 1,125 765
0.013 157,143 2,043
0.011 157,143 1,729
109,836
0.081 92,000 7,452
0.135 92,000 12,420
0.0135 103,000 1,391
0.004 103,000 412
21,675
Jumlah harga per-satuan pekerjaan 131,511
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.200 7,000 8,400
0.350 8,400 2,940
11,340
0.036 92,000 3,312
0.006 92,000 552
0.006 103,000 618
0.002 103,000 206
4,688
Jumlah harga per-satuan pekerjaan 16,028
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
70.000 650 45,500
77.000 1,125 86,625
0.013 157,143 2,043
0.090 157,143 14,143
0.020 128,000 2,560
148,311
3.200 92,000 294,400
1.150 92,000 105,800
0.110 103,000 11,330
0.016 103,000 1,648
413,178
Jumlah harga per-satuan pekerjaan 561,489
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 1,150,000 1,150,000
2.000 18,000 36,000
1,150,000
0.300 92,000 27,600
0.450 92,000 41,400
0.045 103,000 4,635
0.015 103,000 1,545
69,000
Jumlah harga per-satuan pekerjaan 1,219,000
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 400,000 400,000
Jumlah harga per-satuan pekerjaan 400,000
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
4.400 110,000 484,000
14.600 92,000 1,343,200
1,827,200
0.085 92,000 7,820
0.085 92,000 7,820
0.0085 103,000 876
0.0042 103,000 433
16,948
Jumlah harga per-satuan pekerjaan 1,844,148
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 110,000 110,000
0.010 92,000 920
0.500 92,000 46,000
0.050 103,000 5,150
0.005 103,000 515
52,585
Jumlah harga per-satuan pekerjaan 162,585
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 25,300 25,300
0.015 92,000 1,380
0.150 92,000 13,800
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 20,300 20,300
0.010 92,000 920
0.100 92,000 9,200
0.010 103,000 1,030
0.0005 103,000 52
11,202
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 225,000 225,000
0.050 92,000 4,600
0.500 92,000 46,000
0.050 103,000 5,150
0.0025 103,000 258
56,008
Jumlah harga per-satuan pekerjaan 281,008
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 200,000 200,000
0.050 92,000 4,600
0.500 92,000 46,000
0.050 103,000 5,150
0.0025 103,000 258
56,008
Jumlah harga per-satuan pekerjaan 256,008
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 50,000 50,000
0.050 92,000 4,600
0.500 92,000 46,000
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 15,000 15,000
0.015 92,000 1,380
0.150 92,000 13,800
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.100 175,000 192,500
0.050 15,000 750
193,250
0.015 92,000 1,380
0.150 92,000 13,800
0.015 103,000 1,545
0.0008 103,000 82
16,807
Jumlah harga per-satuan pekerjaan 210,057
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.050 160,000 168,000
9.600 1,125 10,800
0.045 157,143 7,071
1.500 3,600 5,400
191,271
0.240 92,000 22,080
0.120 92,000 11,040
0.012 103,000 1,236
0.012 103,000 1,236
35,592
Jumlah harga per-satuan pekerjaan 226,863
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.050 64,000 67,200
11.380 1,125 12,803
0.042 157,143 6,600
1.500 3,600 5,400
92,003
0.620 92,000 57,040
0.350 92,000 32,200
0.035 103,000 3,605
0.030 103,000 3,090
95,935
Jumlah harga per-satuan pekerjaan 187,938
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.050 76,000 79,800
10.000 1,125 11,250
0.045 157,143 7,071
1.500 3,600 5,400
103,521
0.700 92,000 64,400
0.350 92,000 32,200
0.035 103,000 3,605
0.035 103,000 3,605
103,810
Jumlah harga per-satuan pekerjaan 207,331
0 x 25) cm
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.050 65,000 68,250
9.300 1,125 10,463
0.018 157,143 2,829
1.940 3,600 6,984
88,525
0.900 92,000 82,800
0.450 92,000 41,400
0.045 103,000 4,635
0.045 103,000 4,635
133,470
Jumlah harga per-satuan pekerjaan 221,995
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.080 35,500 2,840
0.020 35,000 700
0.500 8,000 4,000
7,540
0.040 92,000 3,680
0.040 92,000 3,680
0.004 103,000 412
0.003 103,000 258
8,030
Jumlah harga per-satuan pekerjaan 15,570
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.200 48,000 9,600
0.150 60,800 9,120
0.170 58,000 9,860
0.260 116,000 30,160
0.030 62,000 1,860
0.010 12,000 120
0.200 12,000 2,400
63,120
0.040 92,000 3,680
0.040 92,000 3,680
0.004 103,000 412
0.003 103,000 258
8,030
Jumlah harga per-satuan pekerjaan 71,150
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
0.100 60,800 6,080
0.100 65,000 6,500
0.260 66,000 17,160
29,740
0.020 92,000 1,840
0.063 92,000 5,796
0.006 103,000 649
0.003 103,000 309
8,594
Jumlah harga per-satuan pekerjaan 38,334
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 47,600 47,600
1.000 22,600 22,600
1.700 3,025 5,143
180,343
0.200 92,000 18,400
0.020 92,000 1,840
0.020 103,000 2,060
0.005 103,000 515
22,815
Jumlah harga per-satuan pekerjaan 203,158
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 28,000 28,000
1.000 22,600 22,600
0.330 3,500 1,155
1.700 3,025 5,143
161,898
0.200 92,000 18,400
0.020 92,000 1,840
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 130,000 130,000
1.000 10,500 10,500
0.330 3,500 1,155
1.700 3,025 5,143
251,798
0.200 92,000 18,400
0.020 92,000 1,840
0.020 103,000 2,060
0.005 103,000 515
22,815
Jumlah harga per-satuan pekerjaan 274,613
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 33,000 33,000
1.700 3,025 5,143
143,143
0.005 92,000 460
0.050 92,000 4,600
0.005 103,000 515
0.0003 103,000 31
5,606
Jumlah harga per-satuan pekerjaan 148,748
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 21,300 21,300
1.700 3,025 5,143
131,443
0.005 92,000 460
0.050 92,000 4,600
0.005 103,000 515
0.0003 103,000 31
5,606
Jumlah harga per-satuan pekerjaan 137,048
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 26,500 26,500
1.700 3,025 5,143
136,643
0.005 92,000 460
0.050 92,000 4,600
0.005 103,000 515
0.0003 103,000 31
5,606
Jumlah harga per-satuan pekerjaan 142,248
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
10.000 10,500 105,000
1.000 60,000 60,000
165,000
0.005 92,000 460
0.050 92,000 4,600
0.005 103,000 515
0.0003 103,000 31
5,606
Jumlah harga per-satuan pekerjaan 170,606
Harga Satuan
Jumlah
Indeks Bahan/Upah
(Rp) (Rp)
1.000 1,000,000 1,000,000
Jumlah harga per-satuan pekerjaan 1,000,000
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN RUMAH KOS TYPE 190/150
I. PEKERJAAN PERSIAPAN
1.1 Pembersihan Lahan m2 150 14,350 2,152,500
1.2 Pengukuran dan Pemasangan bouplank m 42 42,000 1,764,000
Sub Total I 3,916,500
II. PEKERJAAN TANAH
2.1 Pekerjaan Galian Tanah m3 135.177 87,435 11,819,201
2.2 Pekerjaan Urugan Tanah Kembali m3 45.059 51,150 2,304,768
2.3 Pekerjaan Urugan Pasir m3 7.868 217,202 1,708,942
2.4 Pekerjaan Tanah Timbunan m3 13.775 93,150 1,283,141
Sub Total II 17,116,052
III. PEKERJAAN PONDASI
3.1 Pasangan Batu Gunung/ Kali m3 42.76 714,486 30,551,419
3.2 Pasangan Batu Kosong m3 17.8 372,131 6,623,938
Sub Total III 37,175,358
IV. PEKERJAAN DINDING
4.1 Pasangan Dinding 1/2 Bata Merah m2 537.186 101,935 54,758,059
Sub Total IV 54,758,059
V. PEKERJAAN PLESTERAN & ACIAN
5.1 Pekerjaan Plesteran m2 1074.372 53,701 57,694,701
5.2 Pekerjaan Acian m2 1074.372 33,316 35,794,046
Sub Total V 93,488,748
VI. PEKERJAAN KAYU
6.1 Pasang Kusen Pintu dan Jendela m3 2.581 10,863,050 28,037,532
6.2 Pasang Panel Pintu m2 13.35 909,050 12,135,818
Sub Total VI 40,173,350
VII. PEKERJAAN BETON
7.1 Membuat Lantai Kerja m3 1.44 614,900 885,455
7.2 Membuat Pondasi Telapak
a. Volume Beton m3 7.04 805,026 5,667,384
b. Pembesian
- Besi Polos Ø8 kg 49.236 1,367 67,327
- Besi Polos Ø12 kg 274.76 960 263,792
c. Pekerjaan Bekisting m2 43.52 186,516 8,117,176
Sub Total 7.2 14,115,680
7.3 Membuat Sloof (15x20)
a. Volume Beton m3 4.478 805,026 3,604,907
b. Pembesian -
- Besi Polos Ø8 kg 204.58 1,367 279,751
- Besi Polos Ø12 kg 532.524 960 511,267
c. Pekerjaan Bekisting m2 44.78 199,016 8,911,936
Sub Total 7.3 13,307,862
7.4 Membuat Kolom (15x30)
a. Volume Beton m3 5.18 805,026 4,170,035
b. Pembesian -
- Besi Polos Ø8 kg 237.853 1,367 325,250
- Besi Polos Ø12 kg 859.139 960 824,845
c. Pekerjaan Bekisting m2 5.1777 324,078 1,677,979
Sub Total 7.4 6,998,109
7.5 Membuat Kolom (15x15)
a. Volume Beton m3 2.069 805,026 1,665,599
b. Pembesian -
- Besi Polos Ø8 kg 116.794 1,367 159,709
- Besi Polos Ø12 kg 333.608 960 320,291
c. Pekerjaan Bekisting m2 27.588 324,078 8,940,664
Sub Total 7.5 11,086,263
7.6 Membuat Balok (15x30)
a. Volume Beton m3 4.478 805,026 3,604,907
b. Pembesian -
- Besi Polos Ø8 kg 204.58 1,367 279,751
- Besi Polos Ø12 kg 532.524 960 511,267
c. Pekerjaan Bekisting m2 44.78 330,078 14,780,893
Sub Total 7.6 19,176,818
7.7 Membuat Pelat Lantai
a. Volume Beton m3 14.625 805,026 11,773,507
b. Pembesian
- Besi Polos Ø10 kg 1,052.76 13,124 13,815,998
c. Pekerjaan Bekisting m2 92.5 404,078 37,377,215
Sub Total 7.7 62,966,720
7.8 Membuat RingBalk (15x20)
a. Volume Beton m3 66 805,026 53,131,724
b. Pembesian
- Besi Polos Ø8 kg 161.286 1,367 220,549
- Besi Polos Ø12 kg 156.992 960 150,725
c. Pekerjaan Bekisting m2 48.4 330,078 15,975,775
Sub Total 7.8 69,478,774
7.9 Membuat Tangga
a. Volume Beton m3 1.42 805,026 1,143,137
b. Pembesian
- Besi Polos Ø6 kg 2.20 13,701 30,113
- Besi Polos Ø8 kg 7.11 1,367 9,722
- Besi Polos Ø10 kg 82.91 13,124 1,088,077
c. Pekerjaan Bekisting m2 11.54 297,828 3,436,935
Sub Total 7.9 5,707,985
Sub Total VII 203,723,666
VIII. PEKERJAAN ATAP
8.1 Pasang Rangka Kuda-Kuda Canai Dingin m2 216.53 196,630 42,576,294
8.2 Pasang Penutup Atap Spandek m2 216.53 89,937 19,473,997
8.3 Pasang Bubungan/Nok m' 9.4 200,887 1,888,342
Sub Total VIII 63,938,632
IX. PEKERJAAN LANGIT-LANGIT
9.1 Pasang Plafond Gypsumboard + Rangka Plafond m2 176.75 130,983 23,151,298
9.2 Pasang List Plafond Gypsum Profil m2 179.3 17,255 3,093,732
Sub Total IX 26,245,030
X. PEKERJAAN SANITASI
10.1 Memasang 1 bh Kloset Duduk bh 3 1,322,310 3,966,930
10.2 Memasang 1 bh Kran Air bh 6 71,280 427,680
10.3 Memasang 1 bh Bak Cuci Piring bh 1 964,995 964,995
10.4 Memasang 1 bh Westafel bh 1 769,430 769,430
10.5 Memasang 1 m Pipa Penyalur Limbah Cair m 48.64 131,511 6,396,692
10.6 Memasang 1 m Pipa Penyalur Limbah Padat m 35.06 131,511 4,610,773
10.7 Memasang 1 m Pipa Penyalur Air Bersih m 34.36 16,028 550,722
10.8 Memasang 1 bh Bak kontrol batu bata bh 1 561,489 561,489
10.10 Memasang 1 bh Tandon air bh 1 1,219,000 1,219,000
10.11 Pekerjaan Septictank & Bak Peresapan
a.Volume Galian Tanah m3 6.22 87,435 543,846
b.Volume Pasir Urug m3 0.97 217,202 210,686
c.Volume Batu Kali m3 0.76 714,486 543,009
d.Volume Pasang Dinding 1/2 Bata m2 19.53 101,935 1,990,791
e.Volume Plesteran m2 19.53 101,935 1,990,791
f.Volume Pelat Beton m3 0.414 404,078 167,288
g.Volume Pembesian kg 21.30 13,124 279,561
h.Volume Bekisting m2 2.87 324,078 928,483
Sub Total 10.10 6,654,455
Sub Total X 26,122,166
XI PEKERJAAN BESI & ALUMINIUM
11.1 Pasang Railing Besi & Tangga Besi m2 111.84 400,000 44,736,000
11.2 Pasang Pintu Aluminium m2 3.75 1,844,148 6,915,555
Sub Total XI 51,651,555
XII PEKERJAAN KUNCI DAN KACA
12.1 Pasang 1 bh Kunci Pintu bh 6 162,585 975,510
12.2 Pasang 1 bh Engsel Pintu bh 39 42,107 1,642,189
12.3 Pasang 1 bh Engsel Jendela bh 41 31,502 1,291,562
12.4 Pasang 1 bh Pull Handle Pintu bh 4 281,008 1,124,030
12.5 Pasang 1 bh Handle Pintu Biasa bh 5 256,008 1,280,038
12.6 Pasang 1 bh Kunci Dan Handle Pintu Wc bh 3 106,008 318,023
12.7 Pasang 1 bh Hak Angin Jendela bh 18 32,549 585,882
12.8 Pasang 1 bh Kunci Slot Jendela bh 18 45,003 810,054
12.9 Pasang 1 bh Handle Jendela bh 14
12.10 Pasang Kaca m2 52.128 210,057 10,949,872
Sub Total XII 18,977,158
XIII PEKERJAAN PENUTUP LANTAI & DINDING
13.1 Pasang Penutup Lantai
a.Tegel Keramik (60x60) m2 177.25 226,863 40,211,544
b.Tegel Keramik (40x40) m2 18.25 207,331 3,783,799
c.Tegel Keramik (25x25) m2 10.25 187,938 1,926,359
Sub Total 13.1 45,921,702
13.2 Pasang Penutup Dinding Keramik (20x25) m2 36.68 221,995 8,142,779
Sub Total XIII 54,064,481
XIV PEKERJAAN PENGECATAN
14.1 Mendempul dan Menggosok Kayu m2 66.77 15,570 1,039,576
14.2 Mengecat Bidang Kayu Baru m2 66.77 71,150 4,750,652
14.3 Mengecat Tembok Baru m2 1074.372 38,334 41,184,869
Sub Total XIV 46,975,096
XV PEKERJAAN INSTALASI LISTRIK
15.1 Pasang 1 bh Lampu 15 Watt bh 12 22,815 273,780
15.2 Pasang 1 bh Lampu 5 Watt bh 8 184,713 1,477,700
15.3 Pasang 1 bh Lampu Dinding bh 2 274,613 549,225
15.4 Pasang 1 bh Stopkontak bh 9 148,748 1,338,736
15.5 Pasang 1 bh Saklar Tunggal bh 11 137,048 1,507,532
15.6 Pasang 1 bh Saklar Ganda bh 4 142,248 568,994
15.7 Pasang 1 bh Meteran Box(kWh meter) bh 1 1,000,000 1,000,000
15.8 Pasang 1 bh MCB bh 2 170,606 341,212
Sub Total XV 7,057,178
REAL COST 745,383,030
PPN 10 % 74,538,303
TOTAL COST 819,921,333
DIBULATKAN 819,922,000
Terbilang
Delapan Ratus Sembilan Belas Juta Sembilan Ratus Dua Puluh Dua Ribu Rupiah
REKAPITULASI
Delapan Ratus Sembilan Belas Juta Sembilan Ratus Dua Puluh Dua Ribu Rupiah
4,315,378.95