M2 302,288.14
M2 381,185.04
M2 544,112.72
M' 338,025.25
M2 3,527,126.76
M2 1,182,927.38
M2 1,056,046.72
M2 1,103,364.91
M2 93,408.75
M2 342,722.43
Bh 140,371.88
M2 152,883.30
M3 1,245,428.15
M3 622,714.08
M2 33,617.61
M2 184,089.93
M3 68,554.38
M3 84,067.88
M3 99,821.73
M3 91,245.60
M3 138,310.50
M3 110,287.88
M2 4,970.88
M3 30,043.75
M3 49,708.75
M3 49,708.75
M3 215,791.75
M3 213,047.56
M2 54,587.63
M3 179,586.88
M3 871,054.28
M3 825,879.11
M3 830,884.37
M3 772,536.77
M3 742,350.47
M3 572,624.27
M3 685,714.76
M3 664,952.48
M3 456,001.16
M3 #NAME?
M3 629,167.41
M3 1,050,334.67
M3 988,675.30
M3 976,038.42
M3 825,729.22
M3 986,405.39
M3 840,360.88
M3 1,041,045.51
M3 1,055,841.38
M3 1,081,339.50
M3 1,089,192.16
M3 1,169,967.22
M3 1,180,292.86
M3 1,184,537.66
M' 9,160.61
M' 44,890.83
M' 50,757.55
Kg 182,074.61
Kg 169,986.96
Kg 168,748.99
M2 217,348.85
M2 205,084.10
M2 356,243.55
No. Nama Barang Satuan Harga
1 Profil alluminium m2
2 Skrup fixer buah
3 Sealant tube
4 Alluminium strip m
5 Profil kaca m
6 Sunscreen alluminium m2
7 Pintu lipat m2
8 Pintu gulung besi m2
9 Besi scuare tube m
10 Besi lis kaca (1 x 1)cm m
11 Pengelasan cm
12 Rangka metal hollow 40.40.2 mm M1
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
SEMENTER I TAHUN 2015
0
0
0
0
Pondasi Foot Plat T1
4 Jumlah btg (a) = 2.84 Btg 4 Jumlah btg (b) = 2.84 Btg 4 Jumlah btg (c) = - Btg
Ukuran Pondasi :
E. Sengkang :
13 Jumlah Sengkang = - bh
F. Bendrat = - Kg/m3
4 Jumlah btg (a) = 1.75 Btg 4 Jumlah btg (b) = 1.74 Btg 4 Jumlah btg (c) = - Btg
Ukuran Pondasi :
E. Sengkang :
13 Jumlah Sengkang = - bh
F. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 12 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 10 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 22 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 8 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
6 Panjang Total Tul = 68.57 m' 6 Panjang Total Tul = 22.86 m'
8 Jumlah Btg Tul = 5.71 Btg 8 Jumlah Btg Tul = 1.90 Btg
9 Berat Besi 1 Btg Dia. = 16 mm = 18.93 Kg/Btg 9 Berat Besi 1 Btg Dia. = 12 mm = 10.65 Kg/Btg
D. Bendrat = - Kg/m3
Berdasarkan Gambar Kerja :
B1 30/50
A. Dimensi Penampang :
1b = 0.3 m
2h = 0.5 m
B. Tulangan Pokok :
5 Jumlah Tulangan = 12 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 6 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 6 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 6 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
6 Panjang Total Tul = 120.00 m' 6 Panjang Total Tul = 120.00 m'
8 Jumlah Btg Tul = 10.00 Btg 8 Jumlah Btg Tul = 10.00 Btg
9 Berat Besi 1 Btg Dia. = 12 mm = 10.65 Kg/Btg 9 Berat Besi 1 Btg Dia. = 8 mm = 4.73 Kg/Btg
D. Bendrat = - Kg/m3
B. Tulangan Pokok :
5 Jumlah Tulangan = 4 bh
7 Panjang 1 Btg = 12 m
C. Sengkang :
D. Bendrat = - Kg/m3
CALCULATION DETAILS
NO. URAIAN PEKERJAAN B KOEF. UNIT QUANTITY
H L Nos FORMULA
B1 B2 0,5 D 1,0
I PEKERJAAN PERSIAPAN
Lt.2 - Beton, K-250 0.35 0.40 4.00 34.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 19.04
- Pembesian 0.35 0.40 4.00 34.00 156.00 kg 2970.24
- Begisting (2x Pakai) 1.50 1.00 4.00 34.00 1.00 m2 204.00
Lt.2 - Beton, K-250 0.35 0.40 4.00 14.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 7.84
- Pembesian 0.35 0.40 4.00 14.00 153.00 kg 1199.52
- Begisting (2x Pakai) 1.50 1.00 4.00 14.00 1.00 m2 84.00
Lt.2 - Beton, K-250 0.12 0.20 72.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.73
- Pembesian 0.12 0.20 72.00 1.00 133.00 kg 229.82
- Begisting 0.52 1.00 72.00 1.00 1.00 m2 37.44
Lt.2 - Beton, K-250 0.12 0.25 43.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 1.29
- Pembesian 0.12 0.25 43.00 1.00 153.00 kg 197.37
- Begisting 0.62 1.00 43.00 1.00 1.00 m2 26.66
AT - Beton, K-250 0.03 1.50 1.00 21.00 1.00 (B1 + B2) x H x L x Nos x Koef m3 0.95
- Pembesian 0.03 1.50 1.00 21.00 48.00 kg 45.36
- Begisting 1.50 0.20 1.00 21.00 1.00 m2 6.30
IV PEKERJAAN PASANGAN
12 Pek. Acian
= V plesteran 6.90 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 6.90
m2 6.90
X PEKERJAAN ELEKTRIKAL
XI PEKERJAAN PENGECATAN
4 Pengecatan Plafond
= V plafond Gypsum 652.30 1.00 1.00 1.00 1.00 (B1 + B2) x H x L x Nos x Koef m2 652.30
= V plafond GRC 85.60 1.00 1.00 1.00 1.00 m2 85.60
List Plafond 0.10 1.00 529.40 1.00 1.00 m2 52.94
m2 790.84
2 Kursi Murid
1.00 1.00 1.00 40.00 8.00 (B1 + B2) x H x L x Nos x Koef bh 320.00
bh 320.00
3 Meja Guru
1.00 1.00 1.00 1.00 8.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00
4 Kursi Guru
1.00 1.00 1.00 1.00 8.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00
5 Lemari Kelas
1.00 1.00 1.00 1.00 8.00 (B1 + B2) x H x L x Nos x Koef bh 8.00
bh 8.00
-
DAFTAR HARGA UPAH
SEMESTER I TAHUN 2016
A HARGA UPAH :
1 Ahli Bor Hari 110,000.00
2 Kepala Tukang Hari 99,750.00
3 Mandor Hari 104,500.00
4 Mekanik Hari 101,000.00
5 Operator Terlatih Hari 101,000.00
6 Pekerja Hari 76,000.00
7 Pekerja tak Terlatih Hari 72,500.00
8 Pembantu Operator Hari 73,500.00
9 Pembantu Mekanik Hari 73,500.00
10 Pembantu Sopir Hari 73,500.00
11 Penjaga Malam Hari 85,000.00
12 Sopir Terlatih Hari 101,000.00
13 Tukang Anyam, Las Hari 96,000.00
14 Tukang Batu Hari 93,100.00
15 Tukang Besi Hari 93,100.00
16 Tukang Cat Hari 93,100.00
17 Tukang Kayu Hari 93,100.00
18 Tukang Pipa Hari 93,100.00
19 Tukang Khusus Allumunium Hari 93,100.00
20 Instalatur Listrik Hari 95,000.00
21 Asisten Instalatur Listrik Hari 73,625.00
0
-
0
-
ANALISA HARGA SATUAN MEBELAIR
Kode Harga Satuan Upah Bahan Jumlah Harga
URAIAN PEKERJAAN
Analisa (Rp.) (Rp.) (Rp.) (Rp.)
P. PEKERJAAN MEUBELAIR
A.4.1.1.8. Membuat 1 m3 beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 A.4.1.1.8
A.4.2.1.21. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon (Flat) A.4.2.1.21
A. 4.4.1.23.a. Pemasangan 1 m2 dinding terawang (rooster) 30x30 campuran 1SP :4PP A. 4.4.1.23.a
A.4.4.2.4.a Pemasangan 1 m' perapihan opening kusen Allumunium 1SP : 4PP tebal 15 mm A.4.4.2.4.a
A.4.5.1.7. Pemasangan 1 m2 langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm, Flat A.4.5.1.7
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas II A.4.6.1.5
A.4.7.1.10.b. Pengecatan 1 m2 tembok baru ( 1 lapis alkali, 2 lapis cat penutup) - Interior A.4.7.1.10.b
1 2 3 4 5 6 7
I PEKERJAAN PERSIAPAN
9 Pas. Pondasi Batu Belah, Adk. 1:4 A.3.2.1.2 88.02 M3 825,879.11 72,693,879.48
10 Pek. Urugan Kembali Galian Tanah A.2.3.1.9 107.02 M3 49,708.75 5,319,830.43
11 Pek. Urugan Tanah Peninggian Lantai A.2.3.1.14 157.95 M3 179,586.88 28,365,746.91
12 Pek. Pemadatan Urugan Tanah A.2.3.1.10 157.95 M3 49,708.75 7,851,497.06
1 2 3 4 5 6 7
IV PEKERJAAN PASANGAN
1 2 3 4 5 6 7
1 Pek. Rangka Atap Baja Ringan + Genteng Metal Polos - SNI - 516.60 M2 218,400.00 112,825,440.00
X PEKERJAAN ELEKTRIKAL
XI PEKERJAAN PENGECATAN
1 2 3 4 5 6 7
1 Pek. Railing Tangga Besi Hollow Galvanis 4/4 & 2/4 - 7.20 M' 1,050,000.00 7,560,000.00
2 Pek. Handrail, Besi Pipa Galvanis Ø 4" - 41.60 M' 315,000.00 13,104,000.00
3 Logo Kota Bandar Lampung dari Profil Semen LS 1.00 LS 4,725,000.00 4,725,000.00
4 Pas. Atap Polycarbonat, Rangka Besi Hollow - 3.00 M2 1,260,000.00 3,780,000.00
5 Pembersihan Lokasi dan Sisa Material LS 1.00 LS 3,150,000.00 3,150,000.00
JUMLAH Rp 2,865,868,442.92
PPN (10%) Rp 286,586,844.29
JUMLAH TOTAL Rp 3,152,455,287.21
DIBULATKAN Rp 3,152,455,000.00
Terbilang : Tiga Milyar Seratus Lima Puluh Dua Juta Empat Ratus Lima Puluh Lima Ribu Rupiah
Dalam bahasa Indonesia
Tiga Milyar Seratus Lima Puluh Dua Juta Empat Ratus Lima Puluh Lima Ribu Rupiah
3.152.455.000,00
In English
One Hundred Twenty Five Quintillion Four Hundred Eighty Nine Billion Three Hundred Twenty Five Million Four
Hundred Eighty Nine Thousand Six Hundred Forty Two Rupiah
125.489.325.489.642,00
'file:///conversion/tmp/scratch/516724811.xlsx'#$Terbilang
ENGINEER'S ESTIMATE (EE)
1 2 3 4 5 6 7