DAFTAR UPAH PEKERJA

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR
EDISI JANUARI 2017

HARGA
NO. URAIAN PEKERJA SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
1 Pekerja Hr 60,000 65,000
2 Mandor Hr 80,000 85,000
3 Tukang listrik Hr 75,000 85,000
4 Tukang kayu Hr 75,000 85,000
5 Kep. tk. kayu Hr 90,000 95,000
6 Tukang batu Hr 75,000 85,000
7 Kep. tk. batu Hr 90,000 95,000
8 Tukang besi Hr 75,000 85,000
9 Kep. tk. besi Hr 90,000 95,000
10 T u k a n g c a t Hr 75,000 85,000
11 K e p . t k . c a t Hr 90,000 95,000
12 T u k a n g p l i t u r Hr 75,000 85,000
13 T u k a n g j a l a n Hr 60,000 65,000
14 T u k a n g g a l i Hr 60,000 65,000
15 Tukang masak aspal Hr 60,000 65,000
16 T k . l e i d e n g Hr 75,000 85,000
17 M a s i n i s Hr 150,000 175,000
18 P e m b . M a s i n i s Hr 100,000 110,000
19 P e n j a g a a p i Hr 50,000 65,000
20 P e n j a g a m a l a m Hr 60,000 65,000
21 Sopir Hr 150,000 165,000
22 Pembantu Sopir Hr 100,000 110,000
DAFTAR HARGA SATUAN BAHAN BANGUNAN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR
EDISI JANUARI 2017

HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 200,000 220,000
Bulat Belah m3 250,000 290,000
Pecah 10/15 m3 250,000 300,000
Pecah 5/7 m3 300,000 350,000
Pecah 3/5 m3 330,000 360,000
2 KERIKIL Timbun m3 130,000 140,000
Sawur / Koral m3 140,000 160,000
Beton 0,5/1 m3 350,000 370,000
Beton ,1/2 m3 380,000 400,000
Beton ,2/3 m3 380,000 390,000
Biasa m3 240,000 260,000
Tras Giling m3 280,000 330,000
3 BATU BATA ex lokal bh 600 650

4 PASIR Urug m3 200,000 230,000


Pasang m3 310,000 320,000
Beton m3 350,000 390,000
5 TANAH Padas m3 100,000 125,000
Liat m3 110,000 120,000
6 KAPUR Pasang m3 310,000 350,000
Semen Merah m3 175,000 185,000
7 PORTLAND CEMENT
Merk I 40 kg zak 42,000 45,000
Merk I 50 kg zak 56,000 58,000
Merk II 40 kg zak 44,000 46,000
Merk II 50 kg zak 57,000 58,000
Semen Putih 40 kg zak 80,000 82,500
Semen Putih 50 kg zak 85,000 90,000
Semen warna kg 11,000 12,000

II BAHAN PENUTUP ATAP

1 SIRAP (100 lbr) pak 185,000 190,000

2 GENTENG BETON Genteng Beton Warna standard bh 6,000 7,000


Genteng Beton Warna Special bh 9,500 10,500
Genteng Beton Warna Khusus bh 14,000 15,200
Kerpus Beton Warna Standard bh 8,500 10,000
Kerpus Beton Warna Special bh 11,500 12,000
Kerpus Beton Warna Khusus bh 13,000 13,500
3 GENTENG TANAH LIAT
Vlaam/Plentong bh 2,300 2,400
Kodok bh 2,900 3,200
Kodok Glasur bh 4,000 4,250
Nok kerpus Kodok bh 6,500 6,800
Nok kerpus Kodok Glasur bh 8,000 8,500
Plentong super besar 18 bh/m2 bh 5,100 5,350
Nok kerpus plentong super bh 9,000 9,200
4 GENTENG KACA
Vlaam tebal 2 mm bh 10,500 12,500
Vlaam tebal 3 mm bh 13,500 15,000
Kodok tebal 2 mm bh 10,000 12,500
Kodok tebal 3 mm bh 13,000 17,500

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh 86,000 90,000
. 225 cm X 102 cm X 5 mm bh 95,000 102,000
. 250 cm X 102 cm X 5 mm bh 103,000 109,000
. 200 cm X 102 cm X 6 mm bh 92,000 95,000
. 225 cm X 102 cm X 6 mm bh 95,000 100,000
. 250 cm X 102 cm X 6 mm bh 105,000 110,000
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 42,000 45,000
. 180 cm X 105 cm X 4 mm bh 50,500 52,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
. 210 cm X 105 cm X 4 mm bh 59,000 60,000
. 240 cm X 105 cm X 4 mm bh 65,000 68,000
. 270 cm X 105 cm X 4 mm bh 76,000 76,500
. 300 cm X 105 cm X 4 mm bh 80,000 85,000
ONDULINE : 95 cm x 200cm x 0.3mm lbr 145,000 155,000
ONDUVILLA : 40cm x 106 cm x 0,3mm lbr 80,000 90,000
NOK Jabes nok
. Kerpus Genteng bh 31,000 40,000
. Stel Besar bh 45,000 50,000
. Paten Besar bh 43,000 47,000
Nokstel gelombang harflex
. Stel Besar bh 44,000 48,000
. Patent Besar bh 27,000 30,500
. Plat besar bh 51,000 55,000
NOK UNT ONDULINE & ONDUVILLA
Ukuran 50cm x 50 cm x 0,3mm lbr 105,000 110,000
6 ASBES PLAT
. 100cm X 100 cm X 3 mm bh 15,500 16,000
. 100cm X 100 cm X 4 mm bh 20,000 23,000
. 50 cm X 200 cm X 3 mm bh 14,000 15,000
. 40 cm X 200 cm X 3 mm bh 13,000 14,000
FIBER PLAT uk. 100cm x 100cm x 4mm lbr 25,000 30,000
unt Plafond uk. 120cm x 240cm x 4mm lbr 69,000 72,500
uk. 122cm x 244cm x 4mm lbr 70,000 75,000
GRC BOARD uk.122cm x 244cm x 5mm lbr 100,000 108,000
uk.122cm x 244cm x 6mm lbr 125,000 132,000
uk.122cm x 244cm x 8mm lbr 185,000 192,000
uk.122cm x 244cm x 10mm lbr 245,000 260,000
7 FIBRE GLASS (JABES)
180 X 92 cm bh 50,000 60,000
200 X 92 cm bh 57,500 65,000
250 X 92 cm bh 65,500 74,000
180 X 105 cm bh 68,000 90,000
210 X 105 cm bh 70,000 105,000
250 X 105 cm bh 80,000 120,000
8 SENG PLAT
BJLS 0,18 lebar 55 cm m' 22,000 24,500
BJLS 0,20 lebar 55 cm m' 24,500 27,000
BJLS 0,28 lebar 55 cm m' 26,500 30,000
BJLS 0,30 lebar 55 cm m' 30,000 35,000
9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 40,000 45,000
BJLS 0,20 panjang 180 cm lbr 41,500 55,000
BJLS 0,30 panjang 180 cm lbr 59,000 60,000
BJLS 0,40 panjang 180 cm lbr 69,000 75,000
III . B A H A N K A Y U
1 JATI Papan m3 22,000,000 23,000,000
Balok/pesagen m3 20,000,000 20,500,000
2 KAMPER Papan m3 7,600,000 7,800,000
Balok/pesagen m3 6,900,000 7,500,000
3 KRUING Papan m3 6,250,000 7,000,000
Balok/pesagen m3 5,500,000 5,900,000
4 MERANTI Papan m3 4,800,000 5,100,000
Balok/pesagen m3 4,500,000 4,600,000
5 LANAN Papan m3 2,050,000 3,300,000
Balok/pesagen m3 2,000,000 2,100,000
6 BENGKIRAI Papan m3 10,000,000 12,000,000
Balok/pesagen m3 9,375,000 9,850,000
7 DOLKEN Sedang 8 x 10 x 400 cm bt 21,000 24,000
Kecil 6 x 7 x 400 cm bt 18,000 21,000
Besar 10 x 12 x 400 cm bt 31,000 34,000
Kayu cetakan m3 2,200,000 2,700,000
Kayu bakar m3 150,000 170,000
Bambu bt 10,000 12,000
IV . BAHAN PENUTUP DINDING / LANTAI
1 UBIN (TEGEL BIASA)
PC polos 30 X 30 cm m2 34,000 36,000
20 X 20 cm m2 32,000 34,000
PC warna 30 X 30 cm m2 45,000 46,000
20 X 20 cm m2 40,000 42,000
Teraso 30 X 30 cm m2 52,000 56,000
2 TEGEL PLINT
PC warna 10 X 20 cm bh 5,200 5,500
PC abu-abu 15 x 20 bh 5,100 6,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos 42,000 43,000
11 X 11 warna dos 45,000 46,000
Lokal 15 X 15 putih dos 45,000 47,500
15 X 15 warna dos 46,000 49,000
5 MOZAIK PORSELIN
10 X 20 cm m2 50,000 55,000
15 X 15 cm m2 51,000 55,000
20 X 20 cm m2 52,000 60,000
20 X 25 cm m2 52,000 56,000

6 Keramik 30 X 30 cm m2 52,000 57,000


20 X 20 cm m2 52,000 56,000
33 x 33 cm m2 52,000 60,000
25 x 25 cm m2 51,000 55,000
15 x 20 cm m2 52,000 57,000
2,250 2,500
7 Parquet Jati m2 210,000 310,000
8 Batu Paros m2 110,000 115,000
9 Batu Tempel Hitam m2 105,000 115,000
10 GRANITO 60 x 60 cm m2 250,000 280,000
30 x 30 cm m2 250,000 280,000
11 Marmer m2 475,000 480,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 29,000 39,000
Ø 20 cm - 100 cm bh 42,500 50,000
Ø 30 cm - 100 cm bh 64,000 70,000
Ø 50 cm - 100 cm bh 110,000 135,000
Ø 60 cm - 100 cm bh 185,000 190,000
Ø 70 cm - 100 cm bh 225,000 265,000
U 10 cm - 100 cm bh 22,000 22,500
U 15 cm - 100 cm bh 30,500 40,000
U 20 cm - 100 cm bh 39,000 45,000
U 30 cm - 100 cm bh 45,000 55,000
U 50 cm - 100 cm bh - -
2 LUBANG ANGIN (ROSTER) PC + PASIR
10 X 20 cm bh 5,600 7,500
20 X 20 cm bh 6,300 8,000
25 X 25 cm bh 6,800 8,500
30 X 30 cm bh 7,200 9,000
15 X 25 cm bh 7,500 8,200
15 X 30 cm bh 7,500 8,500
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 8,500 9,200
besi beton prestress kg 12,000 12,500
besi beton ulir kg 11,000 11,500

2 BESI PLAT Besi Strip kg 12,000 12,500

3 BESI PROFIL Besi Profil kg 12,500 12,800


a BAJA RINGAN
GALVALUME lebar : 7,5cm tebal : 1mm btg 125,000 panj :6m
type CT 75 lebar : 7,5cm tebal : 0.75mm btg 85,000 panj :6m
lebar : 7,5cm tebal : 0,65mm btg 80,000 panj :6m
b type RT 12 tinggi : 3,5 cm, tebal : 0,45mm btg 45,000 panj :6m
type RT 10 tinggi : 3,0 cm, tebal : 0,45mm btg 40,000 panj :6m
c HOLLOW GALVANIS LIPAT
tinggi 2 cm; tebal : 0,3 mm btg 18,000 22,000 panj : 4 m
tinggi 4 cm; tebal : 0,3 mm btg 24,000 30,000 panj : 4 m
4 JARING - JARING BAJA
Diameter 4 - 15 kg 12,200 12,500
Diameter 6 - 15 kg 13,000 13,500
Kawat Bronjong kg 9,500 10,000
5 BESI SIKU L 40 X 40 X 4 btg 94,000 100,000
L 50 X 50 X 5 btg 145,000 155,000
L 60 X 60 X 6 btg 210,000 220,000

6 KAWAT - Ikat beton/bendrat kg 13,500 14,250


- Harmonika 12 X 45 mm m2 20,000 20,500
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
- Harmonika 12 X 24 mm m2 20,000 21,000
- Harmonika 14 X 30 mm m2 20,000 24,000
- Harmonika 14 X 35 mm m2 19,000 21,000
- Kawat Nyamuk Nylon m2 9,500 12,000
- Kawat Kasa m2 18,000 20,000
- Saringan pasir m2 15,000 20,000
- Kawat loket m2 15,000 22,500
- Kawat duri rol 110,000 135,000
- Kawat bronjong kg 25,000 27,500

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( ½" ) AW JIS btg 28,000 30,000 panjang 4 m
Pipa PVC DN 25 ( ¾" ) AW JIS btg 34,000 36,000 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 37,000 45,000 panjang 4 m
Pipa PVC DN 40 ( 1½" ) btg 60,000 68,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 95,000 105,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 120,500 185,000 panjang 4 m
Pipa PVC DN 110 ( 4" ) btg 270,000 280,000 panjang 4 m
Pipa PVC DN 160 ( 6" ) btg 530,000 550,000 panjang 4 m
Pipa PVC DN 200 ( 8" ) btg 900,000 1,050,000 panjang 4 m
Pipa PVC DN 250 ( 10" ) btg - - panjang 4 m
Pipa PVC DN 315 ( 12" ) btg - - panjang 4 m

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN ½" btg 85,000 105,000 panjang 6 m
Pipa Medium B Galvanis DN 25 ( ¾" ) btg 115,000 150,000 panjang 6 m
Pipa Medium B Galvanis DN 32 ( 1" ) btg 135,000 180,000 panjang 6 m
Pipa Medium B Galvanis DN 50 ( 1½" ) btg 170,000 220,000 panjang 6 m
Pipa Medium B Galvanis DN 63 ( 2" ) btg 225,000 290,000 panjang 6 m
Pipa Medium B Galvanis DN 2½" btg 270,000 350,000 panjang 6 m
Pipa Medium B Galvanis DN 90 ( 3" ) btg 420,000 490,000 panjang 6 m
Pipa Medium B Galvanis DN 110 ( 4" ) btg 560,000 580,000 panjang 6 m
Pipa Medium B Galvanis DN 160 ( 6" ) btg 960,000 1,050,000 panjang 6 m
Pipa Medium B Galvanis DN 200 ( 8" ) btg 1,850,000 2,100,000 panjang 6 m
Pipa Medium B Galvanis DN 250 ( 10") btg - - panjang 6 m

VIII . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 5,500 5,800
30 X 60 lbr 13,000 13,200
60 X 120 lbr 41,000 42,000
List Gypsum Profil m' 16,000 20,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 60,000 65,000
3 HARD BOARD-uk: 4'X 8' lbr 50,500 72,000
GYPROC uk.120cmx240cmx9mm lbr 57,500
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 50,000 75,000
. 120 X 240 X 3 mm lbr 90,000 95,000
. 90 X 210 X 4 mm lbr 65,000 70,000
. 90 X 210 X 9 mm lbr 115,000 125,000
. 90 X 210 X 12 mm lbr 145,000 170,000
. 90 X 210 X 15 mm lbr 225,000 240,000
. 90 X 210 X 18 mm lbr 295,000 310,000
Tripleks
. 120 X 240 X 3 mm lbr 52,000 60,000
. 120 X 240 X 4 mm lbr 62,000 70,000
. 120 X 240 X 6 mm lbr 75,000 80,000
Multipleks
. 120 X 240 X 9 mm lbr 125,000 160,000
. 120 X 240 X 12 mm lbr 145,000 180,000
. 120 X 240 X 15 mm lbr 165,000 190,000
. 120 X 240 X 18 mm lbr 185,000 215,000
Formika ukuran pintu lbr 68,000 75,000

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 25,000 30,000
Dempul plamur kg 25,000 30,000
Ambril/amplas lbr 3,800 4,100
Batu Apung kg 29,000 31,000
Cat dasar kg 34,000 36,500
. Emco kg 50,000 55,000
. Yunior 66 (nippon paint) kg 50,000 58,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
- Koas bh 7,500 8,000
. Deculux kg 55,000 58,000
. Siralax ons 10,000 18,000
. Spiritus ltr 11,000 13,500
. Plitur jadi ltr 35,000 42,000

2 TEMBOK
Kalkarium kg 4,200 5,000
Kapur sirih kg 4,250 4,750
Plamur kg 20,000 32,000
Cat Tembok kg 20,000 21,000
Sintex 5 kg 100,000 105,000
Danabride 5 kg 105,000 115,000
Catylac 5 kg 115,000 120,000
Mowilex 2,50 kg 300,000 350,000

3 BESI
Menie kg 20,000 30,000
Cat mengkilat kg 35,000 58,000
Cat kg 36,000 42,500
Thinner A ltr 15,000 16,000
Minyak cat ltr 13,000 20,000
Thinner Super ltr 12,000 25,000
Residu (teer/aspal) drum 55,000 60,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 1,025,000 1,200,000
kapasitas 1100 liter. bh 1,650,000 1,750,000
Lem Aica Aibon kg 55,000 65,500

X.BAHAN KACA
1 POLOS 3 mm m2 70,000 85,000
5 mm m2 90,000 95,000
2 ES KABUR 3 mm m2 75,000 85,000
5 mm m2 85,000 95,000
3 RAY BAND 3 mm m2 75,000 85,000
5 mm m2 85,000 92,000

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m' 3,100 3,300
SPLN LMK 1 X 2 1/2 mm2 m' 3,700 3,900
. 1X4 mm2 m' 5,700 6,000
1X6 mm2 m' 8,500 8,900
NYY :. 2 X 1 1/2 mm2 m' 9,000 9,450
PRIMA 2 X 2 1/2 mm2 m' 15,000 15,500
. 2X4 mm2 m' 27,000 28,000
2X6 mm2 m' 35,000 37,000
3 X 1 1/2 mm2 m' 13,200 14,000
3 X 2 1/2 mm2 m' 20,000 21,000
3X4 mm2 m' 34,500 36,500
3X6 mm2 m' 50,000 53,000
NYM :. 2 X 1 1/2 mm2 m' 7,000 8,000
PRIMA 2 X 2 1/2 mm2 m' 10,900 11,500
. 2X4 mm2 m' 21,000 23,000
3 X 1 1/2 mm2 m' 12,500 14,000
3 X 2 1/2 mm2 m' 19,000 22,000
3X4 mm2 m' 30,000 35,000
3X6 mm2 m' 43,000 48,000

2 SKAKELAR
Out bauw . Seri bh 15,000 21,000
. Engkel bh 12,000 15,000
In bauw . Seri bh 11,500 16,500
. Engkel bh 9,500 12,000

3 FUSE BOX (SEKERING KASA)


1 group bh 115,000 135,000
2 group bh 220,000 245,000
3 group bh 325,000 360,000

4 STEKER - Biasa bh 10,000 12,000


Arde bh 15,000 16,000
T Biasa bh 12,500 13,000
T dengan Arde bh 17,000 17,500
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)

5 FITING Flaon bh 7,500 11,000


Gantung bh 10,000 20,000
Kap bh 5,000 17,500
Kombinasi bh 275,000 350,000

6 STOP KONTAK - Arde Outbow putih bh 12,500 15,000


Arde Outbow hitam bh 5,000 6,000
Arde IB bh 10,000 15,000
Arde Putar bh 31,000 42,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh 55,000 60,000
2 X slag bh 65,000 70,000
Yale : 1 X slag bh 85,000 95,000
2 X slag bh 140,000 155,000
Kuda : 1 X slag bh 55,000 60,000
2 X slag bh 70,000 75,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh 15,000 16,000
Kupu-kupu biasa bh 4,000 4,500
Nylon kupu-kupu bh 6,000 9,000
Espagnoled - dalam negeri bh 30,000 50,000
Grendel Tanam luar negeri bh 7,500 11,000
Grendel biasa bh 10,000 20,000
Kait Angin bh 5,000 17,500
Door Stop bh 275,000 350,000

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,250,000 1,450,000
2 KLOSET JONGKOK bh 140,000 155,000
3 WASTAFEL PEDESTAL bh 250,000 1,250,000
4 WASTAFEL MEJA OVAL bh 350,000 950,000
5 WASTAFEL GANTUNG BULAT bh 275,000 450,000
6 WASTAFEL GANTUNG SUDUT bh 240,000 310,000
7 WASTAFEL GANTUNG SUDUT KECIL bh 150,000 275,000
8 WASTAFEL BAK CUCI bh 145,000 160,000
9 TEMPAT SABUN GANTUNG bh 30,000 35,000
10 TEMPAT SABUN TANAM bh 20,000 25,000

11 SEPTIC TANK (ETERNIT GRESIK)


5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit - -
12 LAIN - LAIN
Kran Air bh 15,000 35,000
Seal tape bh 3,000 4,100
Floor drain bh 15,000 20,000

XIV . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 12,000 14,000
2 PAKU - payung kg 20,000 30,000
3 PAKU - sekrup kg 6,000 8,000
4 PAKU - beton kg 25,000 30,000
5 MUR BAUT (kuda-kuda) kg 13,000 14,000
6 ANGKUR BAUT bh 13,000 13,500
7 LEM KAYU bh 18,000 20,000
8 Tali Ijuk kg 6,500 7,000

XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 275,000 310,000
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 975,000 1,050,000
Fuji 250 watt bh 1,450,000 1,500,000
Shimizu . 100 watt bh 450,000 510,000
. 90 watt bh 350,000 380,000
Dab . 125 watt bh 350,000 400,000
. 175 watt bh 425,000 450,000

X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
2 HOLLAND Abu-abu m2 50,000 55,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
Merah/hitam m2 52,500 62,000
3 UNIDECOR Abu-abu m2 42,000 55,000
Merah/hitam m2 52,500 62,000
4 UNI Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
5 TRIHEX Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
6 OLYMPIA HEXA Abu-abu m2 50,000 55,000
7 HEXAGONAL Abu-abu m2 52,500 62,000
Merah/hitam m2 50,000 55,000
8 CASTLE Abu-abu m2 52,500 62,000
9 TRAPEZ Abu-abu m2 50,000 55,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 50,000 55,000
11 STANDARD GRASS BLOCK ABU-ABU BH 7,500 8,500
12 BATACO BH 3,000 3,800
13 KANSTEEN m' 15,000 27,000
XVII. L A I N - L A I N
1 KREI 25 MM m2 45,000 50,000
2 Sliding Pintu J4 bh 180,000 235,000
3 Naco per Daun bh 12,000 12,500
4 Rolling door Besi m2 300,000 325,000
Rolling door Almunium m2 230,000 275,000
5 Awning Almunium m2 210,000 225,000
6 Kusen Almunium 4" Putih m' 80,000 85,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg 1,050,000 1,100,000

8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum 1,650,000 1,700,000

Hotmix Tebal = 4 Cm m2 65,000 70,000


Hotmix Tebal = 5 Cm m2 80,000 85,000
Hotmix Tebal = 6 Cm m2 95,000 100,000
Hotmix Tebal = 7 Cm m2 110,000 120,000
Binder Course ton 1,300,000 1,350,000
Wearing Course ton 1,300,000 1,450,000
Hot Roller Sheet ton 1,150,000 1,300,000
Sand Sheet ton 1,100,000 1,250,000
Sand Sheet Emulsi ton 1,450,000 1,600,000
Cold Mix ton 1,750,000 1,850,000
Prime / Tack Coard RC liter 8,200 8,700
Prime Coat MC liter 8,200 8,700
Prime / Tack Coat Emulsi liter 8,200 8,700
10 K A C A
Cermin tebal 5 mm m2 225,000 275,000

11 PAGAR BRC. Pagar BRC 90 A2 /lb 175,000 200,000


Pagar BRC 120 A2 /lb 225,000 250,000
12 LAIN-LAIN
Minyak Beton & bekisting ltr 9,000 10,000
Pintu Lipat Besi m2 380,000 425,000
Sunscreen Allumunim m2 310,000 350,000
Allumunium Foil m2 7,500 8,000
Soda api kg 12,000 13,000
Sabun kg 11,000 13,000
Air m3 12,500 15,000
Koas Alang-alang ikat 1,250 2,000
Solar (Industri) ltr 7,000 7,200
Premium (Industri) ltr 6,200 6,800
Pelumas ltr 37,500 45,000
Vynil 30x30 cm bh 6,200 6,500
DAFTAR SEWA P E R A L A T AN

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR
EDISI JANUARI 2017

HARGA
NO. PERALATAN SATUAN MINIMUM MAKSIMUM KET.
(Rp) (Rp)
1 Dump Truck 3 ton Jam 115,000 120,000
2 Dump Truck 9 ton Jam 160,000 170,000
3 Truk Bak Terbuka Engkel Jam 130,000 140,000
4 Truk Tanki Air Jam 290,000 300,000
5 Bulldozer 100 - 150 hp Jam 650,000 700,000
6 Motor Grader Jam 600,000 640,000
7 Wheel Loader Jam 250,000 280,000
8 Excavator Jam 610,000 660,000
9 Crane 35 ton Jam 435,000 450,000
10 Flat Bed Truck Jam 400,000 440,000
11 Baby Roller / Pedestrian Jam 110,000 120,000
12 P.Tire Roller 8 - 10 ton Jam 530,000 550,000
13 Baby Roller Jam 50,000 60,000
14 Vibrator Roller self 7 ton Jam 500,000 510,000
15 Pile Driver / Hammer Jam 150,000 160,000
16 Water Pump Jam 35,000 40,000
17 Asphalt Sprayer Jam 135,000 140,000
18 Pick Up single cabin Jam 55,000 60,000
19 A M P Jam 5,500,000 5,600,000
20 Asphalt Finisher Jam 330,000 350,000
21 Concrete Vibrator Jam 55,000 60,000
22 Compressor Jam 300,000 320,000
23 Concrete Mixer 0,125m3 Jam 75,000 80,000
24 Concrete Cutter Jam 35,000 40,000
25 Stamper Jam 35,000 40,000
26 Genset 5-25kva+bbm Jam 170,000 190,000
27 Alat Pengecat Marka Jam 300,000 320,000
28 Mesin Las Jam 180,000 200,000
29 Stone Crusher Jam 850,000 900,000
30 Truck Trailler Trip 7,250,000 7,400,000
DAFTAR ANALISA HARGA SATUAN PEKERJAAN (AHSP)

SUMBER DATA : PASARAN BEBAS


D A E R A H : KOTA SEMARANG & SEKITAR
EDISI JANUARI 2017

HARGA BAHAN/UPAH JUMLAH


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

I A. 2.2.1 K.3 HARGA SATUAN PEKERJAAN PERSIAPAN


1 A.2.2.1.2 1 m' Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 534,965.00 594,012.50
A TENAGA 45,400.00 50,600.00
L.01 0.2 OH Pekerja 60,000.00 65,000.00 12,000.00 13,000.00
L.02 0.4 OH Tukang Kayu 75,000.00 85,000.00 30,000.00 34,000.00
L.03 0.02 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.02 OH Mandor 80,000.00 85,000.00 1,600.00 1,700.00
B BAHAN 489,565.00 543,412.50
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 21,000.00 24,000.00 26,250.00 30,000.00
2.5 Kg Portalnd Semen 1,050.00 1,125.00 2,625.00 2,812.50
1.2 Lbr Seng Gelombang 3" - 5" 41,500.00 55,000.00 49,800.00 66,000.00
0.005 m3 Pasir Beton 350,000.00 390,000.00 1,750.00 1,950.00
0.009 m3 Koral Beton 380,000.00 390,000.00 3,420.00 3,510.00
0.072 m3 Kayu 5/7X4m Kayu Kruing 5,500,000.00 5,900,000.00 396,000.00 424,800.00
0.06 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 720.00 840.00
0.45 Kg Meni Besi 20,000.00 30,000.00 9,000.00 13,500.00
C PERALATAN
D Jumlah A + B + C 534,965.00 594,012.50

2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank 124,790.00 136,455.00


A Tenaga 14,800.00 16,375.00
L.01 0.1 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.02 0.1 OH Tukang Kayu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 109,990.00 120,080.00
0.012 m3 Kayu 5/7x 4m Kayu Kruing 5,500,000.00 5,900,000.00 66,000.00 70,800.00
0.02 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 240.00 280.00
0.007 m3 Kayu Papan 3/20 Kruing 6,250,000.00 7,000,000.00 43,750.00 49,000.00
C PERALATAN
D Jumlah A + B + C 124,790.00 136,455.00

3 A.2.2.1.7 K.3 1 m2 Pembuatan Gudang Semen dan Peralatan 1,534,575.00 1,673,887.50


A Tenaga 232,000.00 258,250.00
L.01 1 OH Pekerja 60,000.00 65,000.00 60,000.00 65,000.00
L.02 2 OH Tukang Kayu 75,000.00 85,000.00 150,000.00 170,000.00
L.03 0.2 OH Kepala Tukang 90,000.00 95,000.00 18,000.00 19,000.00
L.04 0.05 OH Mandor 80,000.00 85,000.00 4,000.00 4,250.00
B Bahan 1,302,575.00 1,415,637.50
1.7 Btg Kayu Dolken diameter 8 - 10 / 400 cm 21,000.00 24,000.00 35,700.00 40,800.00
0.21 m3 Kayu 5,500,000.00 5,900,000.00 1,155,000.00 1,239,000.00
0.3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
10.5 Kg Portland Semen 1,050.00 1,125.00 11,025.00 11,812.50
0.03 m3 Pasir Beton 350,000.00 390,000.00 10,500.00 11,700.00
0.05 m3 Koral Beton 380,000.00 390,000.00 19,000.00 19,500.00
1.5 Lbr Seng Gelombang 41,500.00 55,000.00 62,250.00 82,500.00
0.25 Lbr Seng Plat 22,000.00 24,500.00 5,500.00 6,125.00
C PERALATAN
D Jumlah A + B + C 1,534,575.00 1,673,887.50

4 A.2.2.1.8 K.3 1 m2 Pembuatan Bedeng Pekerja 1,517,000.00 1,652,050.00


A Tenaga 232,000.00 258,250.00
L.01 1 OH Pekerja 60,000.00 65,000.00 60,000.00 65,000.00
L.02 2 OH Tukang Kayu 75,000.00 85,000.00 150,000.00 170,000.00
L.03 0.2 OH Kepala Tukang 90,000.00 95,000.00 18,000.00 19,000.00
L.04 0.05 OH Mandor 80,000.00 85,000.00 4,000.00 4,250.00
B Bahan 1,285,000.00 1,393,800.00
1.25 Btg Kayu Dolken diameter 8 - 10 / 400 cm 21,000.00 24,000.00 26,250.00 30,000.00
0.186 m3 Kayu 5,500,000.00 5,900,000.00 1,023,000.00 1,097,400.00
0.30 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
18.00 Kg Portland Semen 1,050.00 1,125.00 18,900.00 20,250.00
0.03 m3 Pasir Beton 350,000.00 390,000.00 10,500.00 11,700.00
0.05 m3 Koral Beton 380,000.00 390,000.00 19,000.00 19,500.00
1.50 Lbr Seng Gelombang 41,500.00 55,000.00 62,250.00 82,500.00
1.35 Lbr Playwood 90,000.00 95,000.00 121,500.00 128,250.00
C PERALATAN
D Jumlah A + B + C 1,517,000.00 1,652,050.00

5 A.2.2.1.9 K.3 1 m2 Membersihkan Lapangan dan Perataan 10,000.00 10,750.00


A Tenaga 10,000.00 10,750.00
L.01 0.1 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.04 0.05 OH Mandor 80,000.00 85,000.00 4,000.00 4,250.00
B Bahan
C PERALATAN
D Jumlah A + B + C 10,000.00 10,750.00

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m 47,000.00 50,875.00
A TENAGA 47,000.00 50,875.00
L.01 0.75 OH Pekerja 60,000.00 65,000.00 45,000.00 48,750.00
L.04 0.025 OH Mandor 80,000.00 85,000.00 2,000.00 2,125.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 47,000.00 50,875.00
Overhead & Profit (contah 10%)
2 A.2.3.1.2 1 m3 Menggali Tanah Biasa Sedalam 2 m 57,600.00 62,325.00
A TENAGA 57,600.00 62,325.00
L.01 0.90 OH Pekerja 60,000.00 65,000.00 54,000.00 58,500.00
L.04 0.045 OH Mandor 80,000.00 85,000.00 3,600.00 3,825.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 57,600.00 62,325.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
Pengurugan Kembali di hitung dari 1/3 kali koefisien
3 A.2.3.1.9 1 m3 34,000.00 36,750.00
Pekerjaan galian
A TENAGA 34,000.00 36,750.00
L.01 0.50 OH Pekerja 60,000.00 65,000.00 30,000.00 32,500.00
L.04 0.050 OH Mandor 80,000.00 85,000.00 4,000.00 4,250.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 34,000.00 36,750.00

4 A.2.3.1.10 1 m3 Pemadatan Tanah (per 20 cm) 34,000.00 36,750.00


A TENAGA 34,000.00 36,750.00
L.01 0.5 OH Pekerja 60,000.00 65,000.00 30,000.00 32,500.00
L.04 0.05 OH Mandor 80,000.00 85,000.00 4,000.00 4,250.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 34,000.00 36,750.00

5 A.2.3.1.11 1 m3 Urugan Pasir 258,000.00 295,500.00


A TENAGA 18,800.00 20,350.00
L.01 0.30 OH Pekerja 60,000.00 65,000.00 18,000.00 19,500.00
L.04 0.01 OH Mandor 80,000.00 85,000.00 800.00 850.00
B BAHAN 240,000.00 276,000.00
1.2 m3 Pasir Urug 200,000.00 230,000.00 240,000.00 276,000.00
C PERALATAN
D Jumlah A + B + C 258,000.00 295,500.00

6 A.2.3.1.14 1 m3 Mengurug Tanah 17,000.00 18,375.00


A TENAGA 17,000.00 18,375.00
0.25 OH Pekerja 60,000.00 65,000.00 15,000.00 16,250.00
0.025 OH Mandor 80,000.00 85,000.00 2,000.00 2,125.00
B BAHAN
C PERALATAN
D Jumlah A + B + C 17,000.00 18,375.00

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP 821,450.00 917,200.00
A TENAGA 159,000.00 174,750.00
L.01 1.5 OH Pekerja 60,000.00 65,000.00 90,000.00 97,500.00
L.02 0.750 OH Tukang Batu 75,000.00 85,000.00 56,250.00 63,750.00
L.03 0.075 OH Kepala Tukang 90,000.00 95,000.00 6,750.00 7,125.00
L.04 0.075 OH Mandor 80,000.00 85,000.00 6,000.00 6,375.00
B BAHAN 662,450.00 742,450.00
1.2 m3 Batu Belah 15/20 250,000.00 300,000.00 300,000.00 360,000.00
202 Kg Portland Sement 1,050.00 1,125.00 212,100.00 227,250.00
0.485 m3 Pasir Pasang 310,000.00 320,000.00 150,350.00 155,200.00
C PERALATAN
D Jumlah A + B + C 821,450.00 917,200.00
Overhead & Profit (contoh 10%)
2 A.3.2.1.9 1 m3 Pemasang Batu Kosong/Anstamping 469,080.00 550,230.00
A Tenaga 82,680.00 90,870.00
L.01 0.78 OH Pekerja 60,000.00 65,000.00 46,800.00 50,700.00
L.02 0.39 OH Tukang Batu 75,000.00 85,000.00 29,250.00 33,150.00
L.03 0.039 OH Kepala Tukang 90,000.00 95,000.00 3,510.00 3,705.00
L.04 0.039 OH Mandor 80,000.00 85,000.00 3,120.00 3,315.00
B Bahan 386,400.00 459,360.00
1.2 m3 Batu Belah 15/20 250,000.00 300,000.00 300,000.00 360,000.00
0.432 m3 Pasir Urug 200,000.00 230,000.00 86,400.00 99,360.00
C PERALATAN
D Jumlah A + B + C 469,080.00 550,230.00

IV A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100),
1 A.4.1.1.4 1.00 m3 845,611.48 904,613.17
slum (3-6)cm, w/c = 0,87
A Tenaga 89,280.00 97,410.00
L.01 1.200 OH Pekerja 60,000.00 65,000.00 72,000.00 78,000.00
L.02 0.200 OH Tukang Batu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.020 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.006 OH Mandor 80,000.00 85,000.00 480.00 510.00
B Bahan 756,331.48 807,203.17
230 Kg Portland Semen 1,050.00 1,125.00 241,500.00 258,750.00
893 kg Pasir Beton 250.00 278.57 223,250.00 248,764.29
1,027 kg Kerikil (maksimum 30 mm) 281.48 288.89 289,081.48 296,688.89
200 ltr Air 12.50 15.00 2,500.00 3,000.00
C PERALATAN
D Jumlah A + B + C 845,611.48 904,613.17

Membuat Beton mutu f'c=19,3 MPa (K225), slum


2 A.4.1.1.7 1 m3 990,233.61 1,057,849.52
(12±2)cm, w/c = 0,58
A Tenaga 128,785.00 140,340.00
L.01 1.650 OH Pekerja 60,000.00 65,000.00 99,000.00 107,250.00
L.02 0.275 OH Tukang Batu 75,000.00 85,000.00 20,625.00 23,375.00
L.03 0.028 OH Kepala Tukang 90,000.00 95,000.00 2,520.00 2,660.00
L.04 0.083 OH Mandor 80,000.00 85,000.00 6,640.00 7,055.00
B Bahan 861,448.61 917,509.52
371 Kg Portland Semen 1,050.00 1,125.00 389,550.00 417,375.00
698 Kg Pasir Beton 250.00 278.57 174,500.00 194,442.86
1,047 Kg Kerikil (maksimum 30 mm) 281.48 288.89 294,711.11 302,466.67
215 ltr Air 12.50 15.00 2,687.50 3,225.00
C PERALATAN
D Jumlah A + B + C 990,233.61 1,057,849.52

3 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir 101,675.00 110,242.50


A Tenaga 10,400.00 11,505.00
L.01 0.07 OH Pekerja 60,000.00 65,000.00 4,200.00 4,550.00
L.02 0.07 OH Tukang Besi 75,000.00 85,000.00 5,250.00 5,950.00
L.03 0.007 OH Kepala Tukang 90,000.00 95,000.00 630.00 665.00
L.04 0.004 OH Mandor 80,000.00 85,000.00 320.00 340.00
B Bahan 91,275.00 98,737.50
10.50 Kg Besi Beton (polos/ulir) 8,500.00 9,200.00 89,250.00 96,600.00
0.150 Kg Kawat Beton 13,500.00 14,250.00 2,025.00 2,137.50
C PERALATAN
D Jumlah A + B + C 101,675.00 110,242.50
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

4 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof 149,620.00 160,280.00


A Tenaga 55,120.00 60,580.00
L.01 0.52 OH Pekerja 60,000.00 65,000.00 31,200.00 33,800.00
L.02 0.26 OH Tukang Kayu 75,000.00 85,000.00 19,500.00 22,100.00
L.03 0.026 OH Kepala Tukang 90,000.00 95,000.00 2,340.00 2,470.00
L.04 0.026 OH Mandor 80,000.00 85,000.00 2,080.00 2,210.00
B Bahan 94,500.00 99,700.00
0.045 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 90,000.00 94,500.00
0.3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
0.1 Ltr Minyak Bekisting 9,000.00 10,000.00 900.00 1,000.00
C PERALATAN
D Jumlah A + B + C 149,620.00 160,280.00

5 A.4.1.1.21 1 m2 Memasang Bekisting untuk Balok Latei 149,620.00 160,280.00


A Tenaga 55,120.00 60,580.00
L.01 0.52 OH Pekerja 60,000.00 65,000.00 31,200.00 33,800.00
L.02 0.26 OH Tukang Kayu 75,000.00 85,000.00 19,500.00 22,100.00
L.03 0.026 OH Kepala Tukang 90,000.00 95,000.00 2,340.00 2,470.00
L.04 0.026 OH Mandor 80,000.00 85,000.00 2,080.00 2,210.00
B Bahan 94,500.00 99,700.00
0.045 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 90,000.00 94,500.00
0.3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
0.1 Ltr Minyak Bekisting 9,000.00 10,000.00 900.00 1,000.00
C PERALATAN
D Jumlah A + B + C 149,620.00 160,280.00

6 A.4.1.1.21 1 m2 Memasang Bekisting untuk Ring Balk 149,620.00 160,280.00


A Tenaga 55,120.00 60,580.00
L.01 0.52 OH Pekerja 60,000.00 65,000.00 31,200.00 33,800.00
L.02 0.26 OH Tukang Kayu 75,000.00 85,000.00 19,500.00 22,100.00
L.03 0.026 OH Kepala Tukang 90,000.00 95,000.00 2,340.00 2,470.00
L.04 0.026 OH Mandor 80,000.00 85,000.00 2,080.00 2,210.00
B Bahan 94,500.00 99,700.00
0.045 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 90,000.00 94,500.00
0.3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
0.1 Ltr Minyak Bekisting 9,000.00 10,000.00 900.00 1,000.00
C PERALATAN
D Jumlah A + B + C 149,620.00 160,280.00

Memasang Bekisting untuk Struktur Kuda-Kuda


7 A.4.1.1.21 1 m2 149,620.00 160,280.00
Gunungan
A Tenaga 55,120.00 60,580.00
L.01 0.52 OH Pekerja 60,000.00 65,000.00 31,200.00 33,800.00
L.02 0.26 OH Tukang Kayu 75,000.00 85,000.00 19,500.00 22,100.00
L.03 0.026 OH Kepala Tukang 90,000.00 95,000.00 2,340.00 2,470.00
L.04 0.026 OH Mandor 80,000.00 85,000.00 2,080.00 2,210.00
B Bahan 94,500.00 99,700.00
0.045 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 90,000.00 94,500.00
0.3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,600.00 4,200.00
0.1 Ltr Minyak Bekisting 9,000.00 10,000.00 900.00 1,000.00
C PERALATAN
D Jumlah A + B + C 149,620.00 160,280.00

8 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom 324,810.00 360,990.00


A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 254,850.00 284,100.00
0.04 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 80,000.00 84,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.2 Ltr Minyak Bekisting 9,000.00 10,000.00 1,800.00 2,000.00
0.015 m3 Balok Kayu Klas II 5,500,000.00 5,900,000.00 82,500.00 88,500.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 21,000.00 24,000.00 42,000.00 48,000.00
C PERALATAN
D Jumlah A + B + C 324,810.00 360,990.00

9 A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok 341,310.00 378,690.00


A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 271,350.00 301,800.00
0.04 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 80,000.00 84,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.2 Ltr Minyak Bekisting 9,000.00 10,000.00 1,800.00 2,000.00
0.018 m3 Balok Kayu Klas II 5,500,000.00 5,900,000.00 99,000.00 106,200.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 21,000.00 24,000.00 42,000.00 48,000.00
C PERALATAN
D Jumlah A + B + C 341,310.00 378,690.00

10 A.4.1.1.24 1 m2 Memasang Bekisting untuk Lantai 408,810.00 456,990.00


A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 338,850.00 380,100.00
0.04 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 80,000.00 84,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.2 Ltr Minyak Bekisting 9,000.00 10,000.00 1,800.00 2,000.00
0.015 m3 Balok Kayu Klas II (Borneo) 5,500,000.00 5,900,000.00 82,500.00 88,500.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 21,000.00 24,000.00 126,000.00 144,000.00
C PERALATAN
D Jumlah A + B + C 408,810.00 456,990.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
11 A.4.1.1.24 1 m2 Memasang Bekisting untuk Topi-Topi 408,810.00 456,990.00
A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 338,850.00 380,100.00
0.04 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 80,000.00 84,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.2 Ltr Minyak Bekisting 9,000.00 10,000.00 1,800.00 2,000.00
0.015 m3 Balok Kayu Klas II (Borneo) 5,500,000.00 5,900,000.00 82,500.00 88,500.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 21,000.00 24,000.00 126,000.00 144,000.00
C PERALATAN
D Jumlah A + B + C 408,810.00 456,990.00

Memasang Bekisting untuk Tutup Septictank &


12 A.4.1.1.24 1 m2 282,810.00 312,990.00
Groundtank
A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 212,850.00 236,100.00
0.04 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 80,000.00 84,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.2 Ltr Minyak Bekisting 9,000.00 10,000.00 1,800.00 2,000.00
0.015 m3 Balok Kayu Klas II (Borneo) 5,500,000.00 5,900,000.00 82,500.00 88,500.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
C PERALATAN
D Jumlah A + B + C 282,810.00 312,990.00

13 A.4.1.1.26 1 m2 Memasang Bekisting untuk Tangga 304,360.00 339,490.00


A Tenaga 69,960.00 76,890.00
L.01 0.66 OH Pekerja 60,000.00 65,000.00 39,600.00 42,900.00
L.02 0.33 OH Tukang Kayu 75,000.00 85,000.00 24,750.00 28,050.00
L.03 0.033 OH Kepala Tukang 90,000.00 95,000.00 2,970.00 3,135.00
L.04 0.033 OH Mandor 80,000.00 85,000.00 2,640.00 2,805.00
B Bahan 234,400.00 262,600.00
0.03 m3 Kayu Klas III (Terentang) 2,000,000.00 2,100,000.00 60,000.00 63,000.00
0.4 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 4,800.00 5,600.00
0.15 Ltr Minyak Bekisting 9,000.00 10,000.00 1,350.00 1,500.00
0.015 m3 Balok Kayu Klas II 5,500,000.00 5,900,000.00 82,500.00 88,500.00
0.35 Lbr Plywood tebal 9mm 125,000.00 160,000.00 43,750.00 56,000.00
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m 21,000.00 24,000.00 42,000.00 48,000.00
C PERALATAN
D Jumlah A + B + C 304,360.00 339,490.00

V A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 A.4.2.1.1 1 Kg Pemasangan Besi Profil 23,255.00 24,545.00
A Tenaga 8,880.00 9,825.00
L.01 0.06 OH Pekerja 60,000.00 65,000.00 3,600.00 3,900.00
L.02 0.06 OH Tukang Besi 75,000.00 85,000.00 4,500.00 5,100.00
L.03 0.006 OH Kepala Tukang 90,000.00 95,000.00 540.00 570.00
L.04 0.003 OH Mandor 80,000.00 85,000.00 240.00 255.00
B Bahan 14,375.00 14,720.00
1.15 Kg Besi Profil 12,500.00 12,800.00 14,375.00 14,720.00
C PERALATAN
D Jumlah A + B + C 23,255.00 24,545.00

2 A.4.2.1.3 100 kg Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 84,740.00 99,220.00


A Tenaga 13,990.00 15,520.00
L.01 0.100 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.02 0.100 OH Tukang Besi 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.001 OH Kepala Tukang 90,000.00 95,000.00 90.00 95.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 10,750.00 11,700.00
1 ltr Solar 7,000.00 7,200.00 7,000.00 7,200.00
0.1 ltr Minyak Pelumas 37,500.00 45,000.00 3,750.00 4,500.00
C PERALATAN 60,000 72,000
0.800 jam Sewa Alat 75,000 90,000 60,000 72,000
D Jumlah A + B + C 84,740.00 99,220.00

3 A.4.2.1.11 1m' Pemasangan Kusen Pintu Allumunium 98,860.00 105,737.00


A Tenaga 6,360.00 7,037.00
L.01 0.043 OH Pekerja 60,000.00 65,000.00 2,580.00 2,795.00
L.02 0.043 OH Tukang Besi 75,000.00 85,000.00 3,225.00 3,655.00
L.03 0.0043 OH Kepala Tukang 90,000.00 95,000.00 387.00 408.50
L.04 0.0021 OH Mandor 80,000.00 85,000.00 168.00 178.50
B Bahan 92,500.00 98,700.00
1.1 m' Profil Allumunium 80,000.00 85,000.00 88,000.00 93,500.00
2 buah Skrup Fixer 750.00 800.00 1,500.00 1,600.00
0.06 Tube Sealant 50,000.00 60,000.00 3,000.00 3,600.00
C PERALATAN
D Jumlah A + B + C 98,860.00 105,737.00

4 A.4.2.1.13 1 m2 Pemasangan Pintu Kaca Rangka Allumunium 400,685.00 431,230.00


A Tenaga 12,685.00 14,030.00
L.01 0.085 OH Pekerja 60,000.00 65,000.00 5,100.00 5,525.00
L.02 0.085 OH Tukang Besi 75,000.00 85,000.00 6,375.00 7,225.00
L.03 0.009 OH Kepala Tukang 90,000.00 95,000.00 810.00 855.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 388,000.00 417,200.00
4.4 m' Pintu Allumunium 80,000.00 85,000.00 352,000.00 374,000.00
4.5 m' Profil Kaca 5,000.00 6,000.00 22,500.00 27,000.00
0.27 tube Sealant 50,000.00 60,000.00 13,500.00 16,200.00
C PERALATAN
D Jumlah A + B + C 400,685.00 431,230.00

VI A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm
1 A.4.4.1.8 1 m2 97,088.50 104,691.25
Tebal 1/2 Bata Camp. 1SP : 3PP
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Rp Rp Rp Rp
1 A.4.4.1.8 1 m2 97,088.50 104,691.25
Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga 27,600.00 30,225.00
L.01 0.30 OH Pekerja 60,000.00 65,000.00 18,000.00 19,500.00
L.02 0.1 OH Tukang Batu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.015 OH Mandor 80,000.00 85,000.00 1,200.00 1,275.00
B Bahan 69,488.50 74,466.25
70 Buah Bata Merah 5 x 11 x 22 600.00 650.00 42,000.00 45,500.00
14.37 Kg Portland Semen 1,050.00 1,125.00 15,088.50 16,166.25
0.04 m3 Pasir Pasang 310,000.00 320,000.00 12,400.00 12,800.00
C PERALATAN
D Jumlah A + B + C 97,088.50 104,691.25

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm


2 A.4.4.1.10 1 m2 93,714.00 101,015.00
Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga 27,600.00 30,225.00
L.01 0.30 OH Pekerja 60,000.00 65,000.00 18,000.00 19,500.00
L.02 0.1 OH Tukang Batu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.015 OH Mandor 80,000.00 85,000.00 1,200.00 1,275.00
B Bahan 66,114.00 70,790.00
70 Buah Bata Merah 5 x 11 x 22 600.00 650.00 42,000.00 45,500.00
9.68 Kg Portland Semen 1,050.00 1,125.00 10,164.00 10,890.00
0.045 m3 Pasir Pasang 310,000.00 320,000.00 13,950.00 14,400.00
C PERALATAN
D Jumlah A + B + C 93,714.00 101,015.00

VII A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.14 1 m2 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm 53,936.40 58,489.00
A Tenaga 33,440.00 36,905.00
L.01 0.26 OH Pekerja 60,000.00 65,000.00 15,600.00 16,900.00
L.02 0.2 OH Tukang batu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.02 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.013 OH Mandor 80,000.00 85,000.00 1,040.00 1,105.00
B Bahan 20,496.40 21,584.00
10.368 Kg Portland Semen 1,050.00 1,125.00 10,886.40 11,664.00
0.031 m3 Pasir Pasang 310,000.00 320,000.00 9,610.00 9,920.00
C PERALATAN
D Jumlah A + B + C 53,936.40 58,489.00

2 A.4.4.2.16 1 m2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 60,667.60 65,746.00


A Tenaga 42,560.00 46,770.00
L.01 0.400 OH Pekerja 60,000.00 65,000.00 24,000.00 26,000.00
L.02 0.200 OH Tukang batu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.020 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.022 OH Mandor 80,000.00 85,000.00 1,760.00 1,870.00
B Bahan 18,107.60 18,976.00
6.912 Kg Portland Semen 1,050.00 1,125.00 7,257.60 7,776.00
0.035 m3 Pasir Pasang 310,000.00 320,000.00 10,850.00 11,200.00
C PERALATAN
D Jumlah A + B + C 60,667.60 65,746.00

3 A.4.4.2.27 1 m2 Pemasangan Acian 24,612.50 26,956.25


Tenaga 21,200.00 23,300.00
L.01 0.20 OH Pekerja 60,000.00 65,000.00 12,000.00 13,000.00
L.02 0.10 OH Tukang batu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.010 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.010 OH Mandor 80,000.00 85,000.00 800.00 850.00
Bahan 3,412.50 3,656.25
3.25 Kg Portland Semen 1,050.00 1,125.00 3,412.50 3,656.25
C PERALATAN
D Jumlah A + B + C 24,612.50 26,956.25

HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan


VIII A.4.4.3
DINDING
1 A.4.4.3.9 1 m2 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm 334,909.17 372,398.27
A Tenaga 26,585.00 29,215.00
L.01 0.250 OH Pekerja 60,000.00 65,000.00 15,000.00 16,250.00
L.02 0.125 OH Tukang Batu 75,000.00 85,000.00 9,375.00 10,625.00
L.03 0.013 OH Kepala Tukang 90,000.00 95,000.00 1,170.00 1,235.00
L.04 0.013 OH Mandor 80,000.00 85,000.00 1,040.00 1,105.00
B Bahan 308,324.17 343,183.27
3.00 Buah Ubin Granito 60x60 cm 0.4 89,928.06 100,719.42 269,784.17 302,158.27
9.8 Kg Portland Semen 0.16 1,050.00 1,125.00 10,290.00 11,025.00
1.300 Kg Semen warna 6.25 11,000.00 12,000.00 14,300.00 15,600.00
0.045 m3 Pasir Pasang 310,000.00 320,000.00 13,950.00 14,400.00
C PERALATAN
D Jumlah A + B + C 334,909.17 372,398.27

2 A.4.4.3.35 1 m2 Pemasangan Lantai Keramik 25 x 25 cm 167,743.75 181,918.75


A Tenaga 74,200.00 81,550.00
L.01 0.70 OH Pekerja 60,000.00 65,000.00 42,000.00 45,500.00
L.02 0.35 OH Tukang Batu 75,000.00 85,000.00 26,250.00 29,750.00
L.03 0.035 OH Kepala Tukang 90,000.00 95,000.00 3,150.00 3,325.00
L.04 0.035 OH Mandor 80,000.00 85,000.00 2,800.00 2,975.00
B Bahan 93,543.75 100,368.75
16.50 Buah Ubin Keramik 25 x 25 cm 3,187.50 3,437.50 52,593.75 56,718.75
10.00 Kg Portland Semen 1,050.00 1,125.00 10,500.00 11,250.00
0.045 m3 Pasir Pasang 310,000.00 320,000.00 13,950.00 14,400.00
1.50 Kg Semen Warna 11,000.00 12,000.00 16,500.00 18,000.00
C PERALATAN
D Jumlah A + B + C 167,743.75 181,918.75

3 A.4.4.3.39 1 m' Pemasangan Plint Granit Ukuran 10 x 60 cm 41,991.02 46,699.00


A Tenaga 13,360.00 14,780.00
L.01 0.09 OH Pekerja 60,000.00 65,000.00 5,400.00 5,850.00
L.02 0.09 OH Tukang Batu 75,000.00 85,000.00 6,750.00 7,650.00
L.03 0.009 OH Kepala Tukang 90,000.00 95,000.00 810.00 855.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
B Bahan 28,631.02 31,919.00
1.75 Buah Ubin Granit 14,988.01 16,786.57 26,229.02 29,376.50
1.14 Kg Portland Semen 1,050.00 1,125.00 1,197.00 1,282.50
0.003 m3 Pasir Pasang 310,000.00 320,000.00 930.00 960.00
0.025 Kg Semen Warna 11,000.00 12,000.00 275.00 300.00
C PERALATAN
D Jumlah A + B + C 41,991.02 46,699.00

4 A.4.4.3.54 1 m2 Pemasangan Dinding Keramik 25 x 40 cm, 191,935.00 209,977.50


A Tenaga 95,400.00 104,850.00
L.01 0.9 OH Pekerja 60,000.00 65,000.00 54,000.00 58,500.00
L.02 0.45 OH Tukang Batu 75,000.00 85,000.00 33,750.00 38,250.00
L.03 0.045 OH Kepala Tukang 90,000.00 95,000.00 4,050.00 4,275.00
L.04 0.045 OH Mandor 80,000.00 85,000.00 3,600.00 3,825.00
B Bahan 96,535.00 105,127.50
10.5 Buah Keramik 5,700.00 6,250.00 59,850.00 65,625.00
9.3 Kg Portland Semen 1,050.00 1,125.00 9,765.00 10,462.50
0.018 m3 Pasir Pasang 310,000.00 320,000.00 5,580.00 5,760.00
1.94 Kg Semen Warna 11,000.00 12,000.00 21,340.00 23,280.00
C PERALATAN
D Jumlah A + B + C 191,935.00 209,977.50

5 A.4.4.3.65 1 m2 Pemasangan Paving Block Natural Tebal 8 Cm 231,604.00 256,795.50


A Tenaga 72,104.00 79,860.50
L.01 0.5 OH Tukang Batu 60,000.00 65,000.00 30,000.00 32,500.00
L.02 0.5 OH Kepala Tukang 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.05 OH Mandor 90,000.00 95,000.00 4,500.00 4,750.00
L.04 0.0013 OH Bahan 80,000.00 85,000.00 104.00 110.50
B Bahan 145,000.00 160,850.00
1.01 m2 Paving Block Tebal 8 Cm 50,000.00 55,000.00 50,500.00 55,550.00
0.27 m3 Pasir Beton 350,000.00 390,000.00 94,500.00 105,300.00
C PERALATAN 14,500.00 16,085.00
10 % Peralatan 145,000.00 160,850.00 14,500.00 16,085.00
D Jumlah A + B + C 231,604.00 256,795.50

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


Memasang Langit-langit Gypsum Board, Ukuran
1 A.4.5.1.7 1 m2 47,665.00 52,465.00
(120x240) tebal 9 mm & Rangka Allumunium
A Tenaga 10,600.00 11,650.00
L.01 0.1 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.02 0.05 OH Tukang Kayu 75,000.00 85,000.00 3,750.00 4,250.00
L.03 0.005 OH Kepala Tukang 90,000.00 95,000.00 450.00 475.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 37,065.00 40,815.00
0.364 Lbr Gypsum Board 60,000.00 65,000.00 21,840.00 23,660.00
0.11 Kg Paku Sekrup 15,000.00 15,500.00 1,650.00 1,705.00
3.6 m' Profil Allumunium "T" 3,500.00 4,000.00 12,600.00 14,400.00
0.15 kg Kawat Ø 4 mm 6,500.00 7,000.00 975.00 1,050.00
C PERALATAN
D Jumlah A + B + C 47,665.00 52,465.00

2 A.4.5.1.9 1 m1 List Langit-Langit Gypsum Profil 26,040.00 31,330.00


A Tenaga 7,440.00 8,230.00
L.01 0.05 OH Pekerja 60,000.00 65,000.00 3,000.00 3,250.00
L.02 0.05 OH Tukang Kayu 75,000.00 85,000.00 3,750.00 4,250.00
L.03 0.005 OH Kepala Tukang 90,000.00 95,000.00 450.00 475.00
L.04 0.003 OH Mandor 80,000.00 85,000.00 240.00 255.00
B Bahan 18,600.00 23,100.00
1.05 m1 List Gypsum Profil 16,000.00 20,000.00 16,800.00 21,000.00
0.15 Kg Tepung Gypsum 12,000.00 14,000.00 1,800.00 2,100.00
C PERALATAN
D Jumlah A + B + C 26,040.00 31,330.00

X A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 A.4.5.2.1 1 m2 Pemasangan Atap Genteng Plentong Kecil 73,440.00 77,517.50
A Tenaga 15,940.00 17,517.50
L.01 0.15 OH Pekerja 60,000.00 65,000.00 9,000.00 9,750.00
L.02 0.075 OH Tukang Kayu 75,000.00 85,000.00 5,625.00 6,375.00
L.03 0.0075 OH Kepala Tukang 90,000.00 95,000.00 675.00 712.50
L.04 0.008 OH Mandor 80,000.00 85,000.00 640.00 680.00
B Bahan 57,500.00 60,000.00
25 Buah Genteng Plentong 2,300.00 2,400.00 57,500.00 60,000.00
C PERALATAN
D Jumlah A + B + C 73,440.00 77,517.50
Overhead & Profit (contoh 10%)
3 A.4.5.2.4 1 m' Pemasangan Genteng Bubung Plentong 104,280.00 110,310.00
A Tenaga 40,960.00 45,070.00
L.01 0.4 OH Pekerja 60,000.00 65,000.00 24,000.00 26,000.00
L.02 0.2 OH Tukang Kayu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.02 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.002 OH Mandor 80,000.00 85,000.00 160.00 170.00
B Bahan 63,320.00 65,240.00
5 Buah Genteng Bubung Plentong 9,000.00 9,200.00 45,000.00 46,000.00
8 Kg Portland Semen 1,050.00 1,125.00 8,400.00 9,000.00
0.032 m3 Pasir Pasang 310,000.00 320,000.00 9,920.00 10,240.00
C PERALATAN
D Jumlah A + B + C 104,280.00 110,310.00

XI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


Pembuatan&Memasang Konstruksi Kuda-kuda
1 A.4.6.1.13 1 m3 9,101,200.00 9,926,900.00
Konvensional Kayu I; II & III Bentang 6 meter
A Tenaga 1,264,000.00 1,411,000.00
L.01 4 OH Pekerja 60,000.00 65,000.00 240,000.00 260,000.00
L.02 12 OH Tukang Kayu 75,000.00 85,000.00 900,000.00 1,020,000.00
L.03 1.2 OH Kepala Tukang 90,000.00 95,000.00 108,000.00 114,000.00
L.04 0.2 OH Mandor 80,000.00 85,000.00 16,000.00 17,000.00
B Bahan 7,837,200.00 8,515,900.00
1.1 m3 Kayu Kamfer, balok 6,900,000.00 7,500,000.00 7,590,000.00 8,250,000.00
15 Kg Besi Strip 12,000.00 12,500.00 180,000.00 187,500.00
5.6 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 67,200.00 78,400.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
C PERALATAN
D Jumlah A + B + C 9,101,200.00 9,926,900.00

2 A.4.6.1.15 1 m3 Pemasangan konstruksi Gording, Kayu Klas II 8,564,400.00 9,326,100.00


A Tenaga 758,400.00 846,600.00
L.01 2.4 OH Pekerja 60,000.00 65,000.00 144,000.00 156,000.00
L.02 7.2 OH Tukang Kayu 75,000.00 85,000.00 540,000.00 612,000.00
L.03 0.72 OH Kepala Tukang 90,000.00 95,000.00 64,800.00 68,400.00
L.04 0.12 OH Mandor 80,000.00 85,000.00 9,600.00 10,200.00
B Bahan 7,806,000.00 8,479,500.00
1.1 m3 Kayu Klas I (Kamfer), balok 6,900,000.00 7,500,000.00 7,590,000.00 8,250,000.00
15 Kg Besi Strip 12,000.00 12,500.00 180,000.00 187,500.00
3 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 36,000.00 42,000.00
C PERALATAN
D Jumlah A + B + C 8,564,400.00 9,326,100.00

Pemasangan Rangka Atap Genteng Keramik, Kayu Klas


3 A.4.6.1.16 1 m2 139,240.00 151,875.00
II
A Tenaga 14,800.00 16,375.00
L.01 0.1 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.02 0.1 OH Tukang Kayu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 124,440.00 135,500.00
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm 6,900,000.00 7,500,000.00 96,600.00 105,000.00
0.0036 m3 Reng (2x3) cm 6,900,000.00 7,500,000.00 24,840.00 27,000.00
0.25 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 3,000.00 3,500.00
C PERALATAN
D Jumlah A + B + C 139,240.00 151,875.00

Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau


4 A.4.6.1.22 1 m' 107,400.00 112,325.00
klas II
A Tenaga 23,200.00 25,825.00
L.01 0.1 OH Pekerja 60,000.00 65,000.00 6,000.00 6,500.00
L.02 0.2 OH Tukang Kayu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.02 OH Kepala Tukang 90,000.00 95,000.00 1,800.00 1,900.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 84,200.00 86,500.00
0.011 m3 Kayu klas II (Kamfer), papan 7,600,000.00 7,800,000.00 83,600.00 85,800.00
0.05 Kg Paku Biasa 2" - 5" 12,000.00 14,000.00 600.00 700.00
C PERALATAN
D Jumlah A + B + C 107,400.00 112,325.00

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa 179,400.00 199,525.00
A Tenaga 39,400.00 44,525.00
L.01 0.01 OH Pekerja 60,000.00 65,000.00 600.00 650.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 140,000.00 155,000.00
1 Buah Kunci Tanam Biasa 140,000.00 155,000.00 140,000.00 155,000.00
C PERALATAN
D Jumlah A + B + C 179,400.00 199,525.00
Overhead & Profit (contoh 10%)
2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi 123,450.00 138,512.50
A Tenaga 38,450.00 43,512.50
L.01 0.005 OH Pekerja 60,000.00 65,000.00 300.00 325.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.005 OH Kepala Tukang 90,000.00 95,000.00 450.00 475.00
L.04 0.0025 OH Mandor 80,000.00 85,000.00 200.00 212.50
B Bahan 85,000.00 95,000.00
1 Buah Kunci Tanam Kamar Mandi 85,000.00 95,000.00 85,000.00 95,000.00
C PERALATAN
D Jumlah A + B + C 123,450.00 138,512.50

3 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu 20,100.00 24,787.50


A Tenaga 14,100.00 15,787.50
L.01 0.015 OH Pekerja 60,000.00 65,000.00 900.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 90,000.00 95,000.00 1,350.00 1,425.00
L.04 0.0075 OH Mandor 80,000.00 85,000.00 600.00 637.50
B Bahan 6,000.00 9,000.00
1 Buah Engsel pintu 6,000.00 9,000.00 6,000.00 9,000.00
C PERALATAN
D Jumlah A + B + C 20,100.00 24,787.50

4 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu 13,400.00 15,025.00


A Tenaga 9,400.00 10,525.00
L.01 0.01 OH Pekerja 60,000.00 65,000.00 600.00 650.00
L.02 0.1 OH Tukang Kayu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 4,000.00 4,500.00
1 Buah Engsel Jendela 4,000.00 4,500.00 4,000.00 4,500.00
C PERALATAN
D Jumlah A + B + C 13,400.00 15,025.00

5 A.4.6.2.9 1 Buah Pemasangan Kait Angin 19,140.00 33,330.00


A Tenaga 14,140.00 15,830.00
L.01 0.015 OH Pekerja 60,000.00 65,000.00 900.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 90,000.00 95,000.00 1,350.00 1,425.00
L.04 0.008 OH Mandor 80,000.00 85,000.00 640.00 680.00
B Bahan 5,000.00 17,500.00
1 Buah Kait Angin 5,000.00 17,500.00 5,000.00 17,500.00
C PERALATAN
D Jumlah A + B + C 19,140.00 33,330.00

6 A.4.6.2.14 1 Buah Pemasangan Rel Pintu Dorong 234,240.00 -


A Tenaga 54,240.00 60,855.00
L.01 0.06 OH Pekerja 60,000.00 65,000.00 3,600.00 3,900.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
L.02 0.6 OH Tukang Kayu 75,000.00 85,000.00 45,000.00 51,000.00
L.03 0.06 OH Kepala Tukang 90,000.00 95,000.00 5,400.00 5,700.00
L.04 0.003 OH Mandor 80,000.00 85,000.00 240.00 255.00
B Bahan 180,000.00 235,000.00
1 Buah Rel Pintu Dorong 180,000.00 235,000.00 180,000.00 235,000.00
C PERALATAN
D Jumlah A + B + C 234,240.00 295,855.00

7 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm 112,560.00 119,713.75


A Tenaga 13,560.00 15,213.75
L.01 0.015 OH Pekerja 60,000.00 65,000.00 900.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 90,000.00 95,000.00 1,350.00 1,425.00
L.04 0.00075 OH Mandor 80,000.00 85,000.00 60.00 63.75
B Bahan 99,000.00 104,500.00
1.1 m2 Kaca tebal 5mm 90,000.00 95,000.00 99,000.00 104,500.00
C PERALATAN
D Jumlah A + B + C 112,560.00 119,713.75

XIII A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat
1 A.4.7.1.4 1 m2 34,410.00 39,425.00
dasar, 2 Lp Cat Penutup)
A Tenaga 5,655.00 6,140.00
L.01 0.070 OH Pekerja 60,000.00 65,000.00 4,200.00 4,550.00
L.02 0.009 OH Tukang Cat 75,000.00 85,000.00 675.00 765.00
L.03 0.006 OH Kepala Tukang 90,000.00 95,000.00 540.00 570.00
L.04 0.003 OH Mandor 80,000.00 85,000.00 240.00 255.00
B Bahan 28,755.00 33,285.00
0.2000 kg Cat Menie 25,000.00 30,000.00 5,000.00 6,000.00
0.1500 kg Plamuur 25,000.00 30,000.00 3,750.00 4,500.00
0.1700 kg Cat Dasar 34,000.00 36,500.00 5,780.00 6,205.00
0.2600 kg Cat Penutup 50,000.00 58,000.00 13,000.00 15,080.00
0.0100 bh Kuas 7,500.00 8,000.00 75.00 80.00
0.0300 kg Pengencer 13,000.00 20,000.00 390.00 600.00
0.2000 lbr Amplas 3,800.00 4,100.00 760.00 820.00
C PERALATAN
D Jumlah A + B + C 34,410.00 39,425.00

Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2


2 A.4.7.1.10 1 m2 15,132.00 17,668.50
Lap.Cat Penutup)
A Tenaga 6,732.00 7,508.50
L.01 0.02 OH Pekerja 60,000.00 65,000.00 1,200.00 1,300.00
L.02 0.063 OH Tukang Cat 75,000.00 85,000.00 4,725.00 5,355.00
L.03 0.0063 OH Kepala Tukang 90,000.00 95,000.00 567.00 598.50
L.04 0.0030 OH Mandor 80,000.00 85,000.00 240.00 255.00
B Bahan 8,400.00 10,160.00
0.1 Kg Plamir 20,000.00 32,000.00 2,000.00 3,200.00
0.1 Kg Cat Dasar 12,000.00 15,000.00 1,200.00 1,500.00
0.26 Kg Cat Penutup 2 kali 20,000.00 21,000.00 5,200.00 5,460.00
C PERALATAN
D Jumlah A + B + C 15,132.00 17,668.50

HARGA SATUAN PEKERJAAN SANITASI DALAM


XIV A.5.1.1
GEDUNG
1 A.5.1.1.1 1 Unit Pemasangan Closet Duduk / Mono Blok 1,618,390.00 1,858,695.00
A Tenaga 293,390.00 321,695.00
L.01 3.3 OH Pekerja 60,000.00 65,000.00 198,000.00 214,500.00
L.02 1.1 OH Tukang Batu 75,000.00 85,000.00 82,500.00 93,500.00
L.03 0.001 OH Kepala Tukang 90,000.00 95,000.00 90.00 95.00
L.04 0.16 OH Mandor 80,000.00 85,000.00 12,800.00 13,600.00
B Bahan 1,325,000.00 1,537,000.00
1 Buah Kloset Duduk / Monoblok 1,250,000.00 1,450,000.00 1,250,000.00 1,450,000.00
0.06 Kelengkapan 6% dari harga Kloset 1,250,000.00 1,450,000.00 75,000.00 87,000.00
C PERALATAN
D Jumlah A + B + C 1,618,390.00 1,858,695.00
Overhead & Profit (contoh 10%)
2 A.5.1.1.5 1 Unit Pemasangan Wastafel 471,275.00 708,025.00
A Tenaga 104,375.00 113,075.00
L.01 1.2 OH Pekerja 60,000.00 65,000.00 72,000.00 78,000.00
L.02 0.145 OH Tukang Batu 75,000.00 85,000.00 10,875.00 12,325.00
L.03 0.15 OH Kepala Tukang 90,000.00 95,000.00 13,500.00 14,250.00
L.04 0.1 OH Mandor 80,000.00 85,000.00 8,000.00 8,500.00
B Bahan 366,900.00 594,950.00
1 Buah Wastafel 275,000.00 450,000.00 275,000.00 450,000.00
0.3 - Perlengkapan 30% Harga Wastafel 275,000.00 450,000.00 82,500.00 135,000.00
6 Kg Portland Semen 1,050.00 1,125.00 6,300.00 6,750.00
0.01 m3 Pasir Pasang 310,000.00 320,000.00 3,100.00 3,200.00
C PERALATAN
D Jumlah A + B + C 471,275.00 708,025.00

3 A.5.1.1.8 1 Unit Memasang Bak Mandi Batu Bata Vol. 0,30 m3 1,173,790.24 1,265,330.49
A Tenaga 614,400.00 676,050.00
L.01 6.00 OH Pekerja 60,000.00 65,000.00 360,000.00 390,000.00
L.02 3.00 OH Tukang Batu 75,000.00 85,000.00 225,000.00 255,000.00
L.03 0.30 OH Kepala Tukang 90,000.00 95,000.00 27,000.00 28,500.00
L.04 0.03 OH Mandor 80,000.00 85,000.00 2,400.00 2,550.00
B Bahan 559,390.24 589,280.49
150.0 bh Batu Bata 600.00 650.00 90,000.00 97,500.00
120 Kg Portland Semen 0.11 1,050.00 1,125.00 126,000.00 135,000.00
0.3 m3 Pasir Pasang 0.0121 310,000.00 320,000.00 93,000.00 96,000.00
360 buah Porselen 11 x 11 cm 82.6446281 512.20 524.39 184,390.24 188,780.49
6 Kg Semen Nat 11,000.00 12,000.00 66,000.00 72,000.00
C PERALATAN
D Jumlah A + B + C 1,173,790.24 1,265,330.49

4 A.5.1.1.12 1 buah Pemasangan Bak Cuci Piring Stainless steel 303,200.00 341,575.00
A Tenaga 28,200.00 31,575.00
L.01 0.030 OH Pekerja 60,000.00 65,000.00 1,800.00 1,950.00
L.02 0.300 OH Tukang Batu 75,000.00 85,000.00 22,500.00 25,500.00
L.03 0.030 OH Kepala Tukang 90,000.00 95,000.00 2,700.00 2,850.00
L.04 0.015 OH Mandor 80,000.00 85,000.00 1,200.00 1,275.00
B Bahan 275,000.00 310,000.00
1 unit Bak Cuci Piring 225,000.00 250,000.00 225,000.00 250,000.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 bh Water drain 50,000.00 60,000.00 50,000.00 60,000.00
C PERALATAN
D Jumlah A + B + C 303,200.00 341,575.00

5 A.5.1.1.14 1 buah Pemasangan Floor Drain 24,400.00 30,525.00


A Tenaga 9,400.00 10,525.00
L.01 0.010 OH Pekerja 60,000.00 65,000.00 600.00 650.00
L.02 0.100 OH Tukang Batu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.010 OH Kepala Tukang 90,000.00 95,000.00 900.00 950.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 15,000.00 20,000.00
1 bh Floor Drain 15,000.00 20,000.00 15,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C 24,400.00 30,525.00

6 A.5.1.1.19 1 bh Pemasangan Kran Ø ½" atau Ø ¾" 49,607.50 73,885.25


A Tenaga 34,600.00 38,875.00
L.01 0.010 OH Pekerja 60,000.00 65,000.00 600.00 650.00
L.02 0.400 OH Tukang Batu 75,000.00 85,000.00 30,000.00 34,000.00
L.03 0.040 OH Kepala Tukang 90,000.00 95,000.00 3,600.00 3,800.00
L.04 0.005 OH Mandor 80,000.00 85,000.00 400.00 425.00
B Bahan 15,007.50 35,010.25
1.00 bh Kran Air 15,000.00 35,000.00 15,000.00 35,000.00
0.0025 bh Sealtape 3,000.00 4,100.00 7.50 10.25
C PERALATAN
D Jumlah A + B + C 49,607.50 73,885.25

7 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW Ø ¾" 20,535.00 22,130.00


A Tenaga 7,360.00 8,180.00
L.01 0.036 OH Pekerja 60,000.00 65,000.00 2,160.00 2,340.00
L.02 0.060 OH Tukang Batu 75,000.00 85,000.00 4,500.00 5,100.00
L.03 0.006 OH Kepala Tukang 90,000.00 95,000.00 540.00 570.00
L.04 0.002 OH Mandor 80,000.00 85,000.00 160.00 170.00
B Bahan 13,175.00 13,950.00
1.20 m' Pipa PVC Ø ¾" 8,500.00 9,000.00 10,200.00 10,800.00
0.35 Ls Perlengkapan 35% x pipa 8,500.00 9,000.00 2,975.00 3,150.00
C PERALATAN
D Jumlah A + B + C 20,535.00 22,130.00

8 A.5.1.1.32 1 m' Pemasangan Pipa PVC tipe AW Ø 4" 77,110.00 80,513.33


A Tenaga 7,360.00 8,180.00
L.01 0.036 OH Pekerja 60,000.00 65,000.00 2,160.00 2,340.00
L.02 0.060 OH Tukang Batu 75,000.00 85,000.00 4,500.00 5,100.00
L.03 0.006 OH Kepala Tukang 90,000.00 95,000.00 540.00 570.00
L.04 0.002 OH Mandor 80,000.00 85,000.00 160.00 170.00
B Bahan 69,750.00 72,333.33
1.20 m' Pipa PVC Ø 4" 45,000.00 46,666.67 54,000.00 56,000.00
0.35 Ls Perlengkapan 35% x pipa 45,000.00 46,666.67 15,750.00 16,333.33
C PERALATAN
D Jumlah A + B + C 77,110.00 80,513.33
DAFTAR HARGA SATUAN PEKERJAAN
BERDASAR PERMEN PUPERA NO.28/PRT/M/2016

EDISI JANUARI 2017

HARGA SATUAN
NO. URAIAN PEKERJAAN SAT
PEKERJAAN

I HARGA SATUAN PEKERJAAN PERSIAPAN


1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' Rp534,965.00
2 Pengukuran dan Pemasangan Bouwplank m' Rp124,790.00
3 Pembuatan Gudang Semen dan Peralatan m2 Rp1,534,575.00
4 Pembuatan Bedeng Pekerja m2 Rp1,517,000.00
5 Membersihkan Lapangan dan Perataan m2 Rp10,000.00

II HARGA SATUAN PEKERJAAN TANAH


1 Menggali Tanah Biasa Sedalam 1 m m3 Rp47,000.00
2 Menggali Tanah Biasa Sedalam 2 m m3 Rp57,600.00
3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian m3 Rp34,000.00
4 Pemadatan Tanah (per 20 cm) m3 Rp34,000.00
5 Urugan Pasir m3 Rp258,000.00
6 Mengurug Tanah m3 Rp17,000.00

III HARGA SATUAN PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah 1SP : 3 PP m3 Rp821,450.00
2 Pemasang Batu Kosong/Anstamping m3 Rp469,080.00

IV HARGA SATUAN PEKERJAAN BETON

1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 Rp845,611.48

2 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 Rp990,233.61
3 Pembesian dg Besi Polos atau Besi Ulir Kg Rp10,167.50
4 Memasang Bekisting untuk Sloof m2 Rp149,620.00
5 Memasang Bekisting untuk Balok Latei m2 Rp149,620.00
6 Memasang Bekisting untuk Ring Balk m2 Rp149,620.00
7 Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan m2 Rp149,620.00
8 Memasang Bekisting untuk Kolom m2 Rp324,810.00
9 Memasang Bekisting untuk Balok m2 Rp341,310.00
10 Memasang Bekisting untuk Lantai m2 Rp408,810.00
11 Memasang Bekisting untuk Topi-Topi m2 Rp408,810.00
12 Memasang Bekisting untuk Tutup Septictank & Groundtank m2 Rp282,810.00
13 Memasang Bekisting untuk Tangga m2 Rp304,360.00

V HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Besi Profil Kg Rp23,255.00
2 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) kg Rp84,740.00
3 Pemasangan Kusen Pintu Allumunium m' Rp98,860.00
4 Pemasangan Pintu Kaca Rangka Allumunium m2 Rp400,685.00

VI HARGA SATUAN PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
1 m2 Rp97,088.50
1SP : 3PP
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT
PEKERJAAN

Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 m2 Rp93,714.00
1SP : 5PP

VII HARGA SATUAN PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm m2 Rp53,936.40
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm m2 Rp60,667.60
3 Pemasangan Acian m2 Rp24,612.50

VIII HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm m2 Rp334,909.17
2 Pemasangan Lantai Keramik 25 x 25 cm m2 Rp167,743.75
3 Pemasangan Plint Granit Ukuran 10 x 60 cm m' Rp41,991.02
4 Pemasangan Dinding Keramik 25 x 40 cm, m2 Rp191,935.00
5 Pemasangan Paving Block Natural Tebal 8 Cm m2 Rp231,604.00

IX HARGA SATUAN PEKERJAAN LANGIT-LANGIT


Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm &
1 m2 Rp47,665.00
Rangka Allumunium
2 List Langit-Langit Gypsum Profil m1 Rp26,040.00

X HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil m2 Rp73,440.00
2 Pemasangan Genteng Bubung Plentong m' Rp104,280.00

XI HARGA SATUAN PEKERJAAN K A Y U


Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III
1 m3 Rp9,101,200.00
Bentang 6 meter
2 Pemasangan konstruksi Gording, Kayu Klas II m3 Rp8,564,400.00
3 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II m2 Rp139,240.00
4 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' Rp107,400.00

XII HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa Buah Rp179,400.00
2 Pemasangan Kunci Kamar Mandi Buah Rp123,450.00
3 Pemasangan Engsel Pintu Buah Rp20,100.00
4 Pemasangan Engsel Jendela Kupu-kupu Buah Rp13,400.00
5 Pemasangan Kait Angin Buah Rp19,140.00
6 Pemasangan Rel Pintu Dorong Buah Rp234,240.00
7 Pemasangan Kaca tebal 5 mm m2 Rp112,560.00

XIII HARGA SATUAN PEKERJAAN PENGECATAN

1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 Rp34,410.00

2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) m2 Rp15,132.00

XIV HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok Unit Rp1,618,390.00
2 Pemasangan Wastafel Unit Rp471,275.00
3 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit Rp1,173,790.24
4 Pemasangan Bak Cuci Piring Stainless stell buah Rp303,200.00
5 Pemasangan Floor Drain buah Rp24,400.00
6 Pemasangan Kran Ø ½" atau Ø ¾" bh Rp49,607.50
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT
PEKERJAAN

7 Pemasangan Pipa PVC tipe AW Ø ¾" m' Rp20,535.00


8 Pemasangan Pipa PVC tipe AW Ø 4" m' Rp77,110.00
DAFTAR VOLUME
PERENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

NO. URAIAN PEKERJAAN SAT VOLUME

A PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m m' 70
2 Pengukuran dan Pemasangan Bouwplank m' 78
3 Pembuatan Gudang Semen dan Peralatan m2 6
4 Pembuatan Bedeng Pekerja m2 9
5 Membersihkan Lapangan dan Perataan m2 300
6 Air Kerja ls 1

II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m m3 197.331
2 Menggali Tanah Biasa Sedalam 2 m m3 70.161
3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian m3 115.483
4 Pemadatan Tanah (per 20 cm) m3 51.129
5 Urugan Pasir m3 43.800
6 Mengurug Tanah m3 51.129

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah 1SP : 3 PP m3 73.036
2 Pemasang Batu Kosong/Anstamping m3 35.741

IV PEKERJAAN BETON
1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 3.496
2 Pekerjaan Footplat
- Pembesian dg Besi Polos atau Besi Ulir Kg 1763.937
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 22.856
3 Pekerjaan Sloof
- Memasang Bekisting untuk Sloof m2 101.015
- Pembesian dg Besi Polos atau Besi Ulir Kg 1277.087
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 7.640
4 Pekerjaan Kolom Struktur LT.1
- Memasang Bekisting untuk Kolom m2 233.688
- Pembesian dg Besi Polos atau Besi Ulir Kg 3478.929
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 19.492
5 Pekerjaan Kolom Praktis LT.1
- Memasang Bekisting untuk Kolom m2 36.096
- Pembesian dg Besi Polos atau Besi Ulir Kg 1098.074
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 4.685
6 Pekerjaan Balok Latei LT.1
- Memasang Bekisting untuk Balok Latei m2 22.654
- Pembesian dg Besi Polos atau Besi Ulir Kg 83.180
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1.618
7 Pekerjaan Topi-Topi LT.1
- Memasang Bekisting untuk Topi-Topi m2 12.720
- Pembesian dg Besi Polos atau Besi Ulir Kg 60.853
NO. URAIAN PEKERJAAN SAT VOLUME

- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 0.873
8 Pekerjaan Tutup Septictank & Groundtank
- Memasang Bekisting untuk Tutup Septictank & Groundtank m2 15.000
- Pembesian dg Besi Polos atau Besi Ulir Kg 266.400
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 0.716

V PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Kusen Pintu Allumunium m' 148.72
2 Pemasangan Pintu Kaca Rangka Allumunium m2 38.16

VI PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
1 m2 139.801
1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 m2 376.473
1SP : 5PP

VII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm m2 255.695
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm m2 752.946
3 Pemasangan Acian m2 984.734

VIII PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm m2 126.72
2 Pemasangan Lantai Keramik 25 x 25 cm m2 10.438
3 Pemasangan Plint Granit Ukuran 10 x 60 cm m' 121.97
4 Pemasangan Dinding Keramik 25 x 40 cm, m2 13.078
5 Pemasangan Paving Block Natural Tebal 8 Cm m2 104.943

IX PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm &
1 m2 134.502
Rangka Allumunium
2 List Langit-Langit Gypsum Profil m1 179.78

X PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil m2 11.001
2 Pemasangan Genteng Bubung Plentong m' 1.93

XI PEKERJAAN KAYU
1 Pemasangan konstruksi Gording, Kayu Klas II m3 0.1
2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II m2 11.001
3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' 9.56

XII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa Buah 9
2 Pemasangan Kunci Kamar Mandi Buah 3
3 Pemasangan Engsel Pintu Buah 76
4 Pemasangan Engsel Jendela Kupu-kupu Buah 56
5 Pemasangan Kait Angin Buah 82
6 Pemasangan Kaca tebal 5 mm m2 17.46

XIII PEKERJAAN PENGECATAN


NO. URAIAN PEKERJAAN SAT VOLUME

1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 4.971
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) m2 984.734

XIV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok Unit 3
2 Pemasangan Wastafel Unit 2
3 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 Unit 3
4 Pemasangan Bak Cuci Piring Stainless stell buah 1
5 Pemasangan Floor Drain buah 7
6 Pemasangan Kran Ø ½" atau Ø ¾" bh 7
7 Pemasangan Pipa PVC tipe AW Ø ¾" m' 46.430
8 Pemasangan Pipa PVC tipe AW Ø 4" m' 54.124

B PEKERJAAN LANTAI 2
XV PEKERJAAN BETON
1 Pekerjaan Balok
- Memasang Bekisting untuk Balok m2 125.585
- Pembesian dg Besi Polos atau Besi Ulir Kg 4571.184
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 11.488
2 Pekerjaan Plat Lantai 2
- Memasang Bekisting untuk Lantai m2 163.245
- Pembesian dg Besi Polos atau Besi Ulir Kg 2450.968
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 21.221
3 Pekerjaan Kolom Struktur LT.2
- Memasang Bekisting untuk Kolom m2 62.586
- Pembesian dg Besi Polos atau Besi Ulir Kg 475.366
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 3.129
4 Pekerjaan Kolom Praktis LT.2
- Memasang Bekisting untuk Kolom m2 28.776
- Pembesian dg Besi Polos atau Besi Ulir Kg 634.082
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 2.158
5 Pekerjaan Balok Latei LT.2
- Memasang Bekisting untuk Balok Latei m2 15.956
- Pembesian dg Besi Polos atau Besi Ulir Kg 194.567
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1.140
6 Pekerjaan Topi-Topi LT.2
- Memasang Bekisting untuk Topi-Topi m2 11.715
- Pembesian dg Besi Polos atau Besi Ulir Kg 56.046
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 0.803
7 Pekerjaan Ring Balk
- Memasang Bekisting untuk Ring Balk m2 71.825
- Pembesian dg Besi Polos atau Besi Ulir Kg 907.219
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 5.387
8 Pekerjaan Struktur Kuda-Kuda Gunungan
- Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan m2 14.148
- Pembesian dg Besi Polos atau Besi Ulir Kg 554.252
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 1.978
9 Pekerjaan Tangga
- Memasang Bekisting untuk Tangga m2 11.494
- Pembesian dg Besi Polos atau Besi Ulir Kg 341.966
NO. URAIAN PEKERJAAN SAT VOLUME

- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 2.526
10 Pekerjaan Plat Dak Tandon
- Memasang Bekisting untuk Lantai m2 3.750
- Pembesian dg Besi Polos atau Besi Ulir Kg 48.980
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 m3 0.487

XVI PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Besi Profil Kg 1602.475
2 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) kg 2082.475
3 Pemasangan Kusen Pintu Allumunium m' 143.48
4 Pemasangan Pintu Kaca Rangka Allumunium m2 35.566

XVII PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
1 m2 54.175
1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 m2 185.839
1SP : 5PP

XVIII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm m2 108.35
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm m2 571.678
3 Pemasangan Acian m2 635.418

XIX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm m2 153.456
2 Pemasangan Lantai Keramik 25 x 25 cm m2 5.671
3 Pemasangan Plint Granit Ukuran 10 x 60 cm m' 118.73
4 Pemasangan Dinding Keramik 25 x 40 cm, m2 8.788

XX PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm &
1 m2 145.162
Rangka Allumunium
2 List Langit-Langit Gypsum Profil m1 128.42

XXI PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil m2 247.46
2 Pemasangan Genteng Bubung Plentong m' 8.6

XXII PEKERJAAN KAYU


Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III
1 m3 0.534
Bentang 6 meter
2 Pemasangan konstruksi Gording, Kayu Klas II m3 0.766
3 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II m2 247.46
4 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II m' 74.58

XXIII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa Buah 5
2 Pemasangan Kunci Kamar Mandi Buah 2
3 Pemasangan Engsel Pintu Buah 34
4 Pemasangan Engsel Jendela Kupu-kupu Buah 88
5 Pemasangan Kait Angin Buah 100
NO. URAIAN PEKERJAAN SAT VOLUME

6 Pemasangan Rel Pintu Dorong Buah 1


7 Pemasangan Kaca tebal 5 mm m2 20.78

XXIV PEKERJAAN PENGECATAN


1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) m2 38.782
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) m2 635.418

XXV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok Unit 2
2 Pemasangan Floor Drain buah 2
3 Pemasangan Kran Ø ½" atau Ø ¾" bh 2
4 Pemasangan Pipa PVC tipe AW Ø ¾" m' 19.898
5 Pemasangan Pipa PVC tipe AW Ø 4" m' 23.196
RENCANA ANGGARAN BIAYA
PERENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

HARGA SAT.
NO. URAIAN PEKERJAAN VOLUME SAT JUMLAH
PEKERJAAN

A PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 70.000 m' Rp534,965.00 Rp37,447,550.00
2 Pengukuran dan Pemasangan Bouwplank 78.000 m' Rp124,790.00 Rp9,733,620.00
3 Pembuatan Gudang Semen dan Peralatan 6.000 m2 Rp1,534,575.00 Rp9,207,450.00
4 Pembuatan Bedeng Pekerja 9.000 m2 Rp1,517,000.00 Rp13,653,000.00
5 Membersihkan Lapangan dan Perataan 300.000 m2 Rp10,000.00 Rp3,000,000.00
6 Air Kerja 1.000 ls Rp6,000,000.00 Rp6,000,000.00

II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 197.331 m3 Rp47,000.00 Rp9,274,557.00
2 Menggali Tanah Biasa Sedalam 2 m 70.161 m3 Rp57,600.00 Rp4,041,273.60
3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian 115.483 m3 Rp34,000.00 Rp3,926,422.00
4 Pemadatan Tanah (per 20 cm) 51.129 m3 Rp34,000.00 Rp1,738,386.00
5 Urugan Pasir 43.800 m3 Rp258,000.00 Rp11,300,400.00
6 Mengurug Tanah 51.129 m3 Rp17,000.00 Rp869,193.00

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah 1SP : 3 PP 73.036 m3 Rp821,450.00 Rp59,995,422.20
2 Pemasang Batu Kosong/Anstamping 35.741 m3 Rp469,080.00 Rp16,765,388.28

IV PEKERJAAN BETON
1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 3.496 m3 Rp845,611.48 Rp2,956,257.74
2 Pekerjaan Footplat
- Pembesian dg Besi Polos atau Besi Ulir 1763.937 Kg Rp10,167.50 Rp17,934,829.45
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 22.856 m3 Rp990,233.61 Rp22,632,779.42
3 Pekerjaan Sloof
- Memasang Bekisting untuk Sloof 101.015 m2 Rp149,620.00 Rp15,113,864.30
- Pembesian dg Besi Polos atau Besi Ulir 1277.087 Kg Rp10,167.50 Rp12,984,782.07
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 7.640 m3 Rp990,233.61 Rp7,565,384.79
4 Pekerjaan Kolom Struktur LT.1
- Memasang Bekisting untuk Kolom 233.688 m2 Rp324,810.00 Rp75,904,199.28
- Pembesian dg Besi Polos atau Besi Ulir 3478.929 Kg Rp10,167.50 Rp35,372,010.61
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 19.492 m3 Rp990,233.61 Rp19,301,633.55
5 Pekerjaan Kolom Praktis LT.1
- Memasang Bekisting untuk Kolom 36.096 m2 Rp324,810.00 Rp11,724,341.76
- Pembesian dg Besi Polos atau Besi Ulir 1098.074 Kg Rp10,167.50 Rp11,164,667.40
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 4.685 m3 Rp990,233.61 Rp4,639,244.47
6 Pekerjaan Balok Latei LT.1
- Memasang Bekisting untuk Balok Latei 22.654 m2 Rp149,620.00 Rp3,389,491.48
- Pembesian dg Besi Polos atau Besi Ulir 83.180 Kg Rp10,167.50 Rp845,732.65
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1.618 m3 Rp990,233.61 Rp1,602,197.98
7 Pekerjaan Topi-Topi LT.1
- Memasang Bekisting untuk Topi-Topi 12.720 m2 Rp408,810.00 Rp5,200,063.20
- Pembesian dg Besi Polos atau Besi Ulir 60.853 Kg Rp10,167.50 Rp618,722.88
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 0.873 m3 Rp990,233.61 Rp864,473.94
8 Pekerjaan Tutup Septictank & Groundtank
- Memasang Bekisting untuk Tutup Septictank & Groundtank 15.000 m2 Rp282,810.00 Rp4,242,150.00
- Pembesian dg Besi Polos atau Besi Ulir 266.400 Kg Rp10,167.50 Rp2,708,622.00
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 0.716 m3 Rp990,233.61 Rp709,007.27

V PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 148.720 m' Rp98,860.00 Rp14,702,459.20
2 Pemasangan Pintu Kaca Rangka Allumunium 38.160 m2 Rp400,685.00 Rp15,290,139.60

VI PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP 139.801 m2 Rp97,088.50 Rp13,573,069.39
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP 376.473 m2 Rp93,714.00 Rp35,280,790.72

VII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm 255.695 m2 Rp53,936.40 Rp13,791,267.80
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 752.946 m2 Rp60,667.60 Rp45,679,426.75
3 Pemasangan Acian 984.734 m2 Rp24,612.50 Rp24,236,765.58

VIII PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm 126.720 m2 Rp334,909.17 Rp42,439,690.36
2 Pemasangan Lantai Keramik 25 x 25 cm 10.438 m2 Rp167,743.75 Rp1,750,909.26
3 Pemasangan Plint Granit Ukuran 10 x 60 cm 121.970 m' Rp41,991.02 Rp5,121,644.32
4 Pemasangan Dinding Keramik 25 x 40 cm, 13.078 m2 Rp191,935.00 Rp2,510,125.93
5 Pemasangan Paving Block Natural Tebal 8 Cm 104.943 m2 Rp231,604.00 Rp24,305,218.57

IX PEKERJAAN LANGIT-LANGIT
1 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium 134.502 m2 Rp47,665.00 Rp6,411,037.83
2 List Langit-Langit Gypsum Profil 179.780 m1 Rp26,040.00 Rp4,681,471.20
HARGA SAT.
NO. URAIAN PEKERJAAN VOLUME SAT JUMLAH
PEKERJAAN

X PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil 11.001 m2 Rp73,440.00 Rp807,913.44
2 Pemasangan Genteng Bubung Plentong 1.930 m' Rp104,280.00 Rp201,260.40

XI PEKERJAAN KAYU
1 Pemasangan konstruksi Gording, Kayu Klas II 0.100 m3 Rp8,564,400.00 Rp856,440.00
2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II 11.001 m2 Rp139,240.00 Rp1,531,779.24
3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 9.560 m' Rp107,400.00 Rp1,026,744.00

XII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa 9.000 Buah Rp179,400.00 Rp1,614,600.00
2 Pemasangan Kunci Kamar Mandi 3.000 Buah Rp123,450.00 Rp370,350.00
3 Pemasangan Engsel Pintu 76.000 Buah Rp20,100.00 Rp1,527,600.00
4 Pemasangan Engsel Jendela Kupu-kupu 56.000 Buah Rp13,400.00 Rp750,400.00
5 Pemasangan Kait Angin 82.000 Buah Rp19,140.00 Rp1,569,480.00
6 Pemasangan Kaca tebal 5 mm 17.460 m2 Rp112,560.00 Rp1,965,297.60

XIII PEKERJAAN PENGECATAN


1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 4.971 m2 Rp34,410.00 Rp171,052.11
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) 984.734 m2 Rp15,132.00 Rp14,900,994.89

XIV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok 3.000 Unit Rp1,618,390.00 Rp4,855,170.00
2 Pemasangan Wastafel 2.000 Unit Rp471,275.00 Rp942,550.00
3 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 3.000 Unit Rp1,173,790.24 Rp3,521,370.73
4 Pemasangan Bak Cuci Piring Stainless stell 1.000 buah Rp303,200.00 Rp303,200.00
5 Pemasangan Floor Drain 7.000 buah Rp24,400.00 Rp170,800.00
6 Pemasangan Kran Ø ½" atau Ø ¾" 7.000 bh Rp49,607.50 Rp347,252.50
7 Pemasangan Pipa PVC tipe AW Ø ¾" 46.430 m' Rp20,535.00 Rp953,431.84
8 Pemasangan Pipa PVC tipe AW Ø 4" 54.124 m' Rp77,110.00 Rp4,173,501.64

B PEKERJAAN LANTAI 2
XV PEKERJAAN BETON
1 Pekerjaan Balok
- Memasang Bekisting untuk Balok 125.585 m2 Rp341,310.00 Rp42,863,416.35
- Pembesian dg Besi Polos atau Besi Ulir 4571.184 Kg Rp10,167.50 Rp46,477,513.32
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 11.488 m3 Rp990,233.61 Rp11,375,803.72
2 Pekerjaan Plat Lantai 2
- Memasang Bekisting untuk Lantai 163.245 m2 Rp408,810.00 Rp66,736,188.45
- Pembesian dg Besi Polos atau Besi Ulir 2450.968 Kg Rp10,167.50 Rp24,920,217.14
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 21.221 m3 Rp990,233.61 Rp21,013,747.46
3 Pekerjaan Kolom Struktur LT.2
- Memasang Bekisting untuk Kolom 62.586 m2 Rp324,810.00 Rp20,328,558.66
- Pembesian dg Besi Polos atau Besi Ulir 475.366 Kg Rp10,167.50 Rp4,833,283.81
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 3.129 m3 Rp990,233.61 Rp3,098,440.97
4 Pekerjaan Kolom Praktis LT.2
- Memasang Bekisting untuk Kolom 28.776 m2 Rp324,810.00 Rp9,346,732.56
- Pembesian dg Besi Polos atau Besi Ulir 634.082 Kg Rp10,167.50 Rp6,447,028.74
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 2.158 m3 Rp990,233.61 Rp2,136,924.13
5 Pekerjaan Balok Latei LT.2
- Memasang Bekisting untuk Balok Latei 15.956 m2 Rp149,620.00 Rp2,387,336.72
- Pembesian dg Besi Polos atau Besi Ulir 194.567 Kg Rp10,167.50 Rp1,978,259.97
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1.140 m3 Rp990,233.61 Rp1,128,866.32
6 Pekerjaan Topi-Topi LT.2
- Memasang Bekisting untuk Topi-Topi 11.715 m2 Rp408,810.00 Rp4,789,209.15
- Pembesian dg Besi Polos atau Besi Ulir 56.046 Kg Rp10,167.50 Rp569,847.71
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 0.803 m3 Rp990,233.61 Rp795,157.59
7 Pekerjaan Ring Balk
- Memasang Bekisting untuk Ring Balk 71.825 m2 Rp149,620.00 Rp10,746,456.50
- Pembesian dg Besi Polos atau Besi Ulir 907.219 Kg Rp10,167.50 Rp9,224,149.18
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 5.387 m3 Rp990,233.61 Rp5,334,388.46
8 Pekerjaan Struktur Kuda-Kuda Gunungan
- Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan 14.148 m2 Rp149,620.00 Rp2,116,823.76
- Pembesian dg Besi Polos atau Besi Ulir 554.252 Kg Rp10,167.50 Rp5,635,357.21
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1.978 m3 Rp990,233.61 Rp1,958,682.08
9 Pekerjaan Tangga
- Memasang Bekisting untuk Tangga 11.494 m2 Rp304,360.00 Rp3,498,313.84
- Pembesian dg Besi Polos atau Besi Ulir 341.966 Kg Rp10,167.50 Rp3,476,939.31
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 2.526 m3 Rp990,233.61 Rp2,501,330.10
10 Pekerjaan Plat Dak Tandon
- Memasang Bekisting untuk Lantai 3.750 m2 Rp408,810.00 Rp1,533,037.50
- Pembesian dg Besi Polos atau Besi Ulir 48.980 Kg Rp10,167.50 Rp498,004.15
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 0.487 m3 Rp990,233.61 Rp482,243.77

XVI PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Besi Profil 1602.475 Kg Rp23,255.00 Rp37,265,556.13
2 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 2082.475 kg Rp84,740.00 Rp176,468,931.50
3 Pemasangan Kusen Pintu Allumunium 143.480 m' Rp98,860.00 Rp14,184,432.80
4 Pemasangan Pintu Kaca Rangka Allumunium 35.566 m2 Rp400,685.00 Rp14,250,762.71
HARGA SAT.
NO. URAIAN PEKERJAAN VOLUME SAT JUMLAH
PEKERJAAN

XVII PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP 54.175 m2 Rp97,088.50 Rp5,259,769.49
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP 185.839 m2 Rp93,714.00 Rp17,415,716.05

XVIII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm 108.350 m2 Rp53,936.40 Rp5,844,008.94
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 571.678 m2 Rp60,667.60 Rp34,682,332.23
3 Pemasangan Acian 635.418 m2 Rp24,612.50 Rp15,639,225.53

XIX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm 153.456 m2 Rp334,909.17 Rp51,393,822.00
2 Pemasangan Lantai Keramik 25 x 25 cm 5.671 m2 Rp167,743.75 Rp951,274.81
3 Pemasangan Plint Granit Ukuran 10 x 60 cm 118.730 m' Rp41,991.02 Rp4,985,593.42
4 Pemasangan Dinding Keramik 25 x 40 cm, 8.788 m2 Rp191,935.00 Rp1,686,724.78

XX PEKERJAAN LANGIT-LANGIT
1 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium 145.162 m2 Rp47,665.00 Rp6,919,146.73
2 List Langit-Langit Gypsum Profil 128.420 m1 Rp26,040.00 Rp3,344,056.80

XXI PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil 247.460 m2 Rp73,440.00 Rp18,173,462.40
2 Pemasangan Genteng Bubung Plentong 8.600 m' Rp104,280.00 Rp896,808.00

XXII PEKERJAAN KAYU


1 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter 0.534 m3 Rp9,101,200.00 Rp4,860,040.80
2 Pemasangan konstruksi Gording, Kayu Klas II 0.766 m3 Rp8,564,400.00 Rp6,560,330.40
3 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II 247.460 m2 Rp139,240.00 Rp34,456,330.40
4 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 74.580 m' Rp107,400.00 Rp8,009,892.00

XXIII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa 5.000 Buah Rp179,400.00 Rp897,000.00
2 Pemasangan Kunci Kamar Mandi 2.000 Buah Rp123,450.00 Rp246,900.00
3 Pemasangan Engsel Pintu 34.000 Buah Rp20,100.00 Rp683,400.00
4 Pemasangan Engsel Jendela Kupu-kupu 88.000 Buah Rp13,400.00 Rp1,179,200.00
5 Pemasangan Kait Angin 100.000 Buah Rp19,140.00 Rp1,914,000.00
6 Pemasangan Rel Pintu Dorong 1.000 Buah Rp234,240.00 Rp234,240.00
7 Pemasangan Kaca tebal 5 mm 20.780 m2 Rp112,560.00 Rp2,338,996.80

XXIV PEKERJAAN PENGECATAN


1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 38.782 m2 Rp34,410.00 Rp1,334,488.62
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) 635.418 m2 Rp15,132.00 Rp9,615,145.18

XXV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok 2.000 Unit Rp1,618,390.00 Rp3,236,780.00
2 Pemasangan Floor Drain 2.000 buah Rp24,400.00 Rp48,800.00
3 Pemasangan Kran Ø ½" atau Ø ¾" 2.000 bh Rp49,607.50 Rp99,215.00
4 Pemasangan Pipa PVC tipe AW Ø ¾" 19.898 m' Rp20,535.00 Rp408,613.64
5 Pemasangan Pipa PVC tipe AW Ø 4" 23.196 m' Rp77,110.00 Rp1,788,643.56
REKAPITULASI
PERENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

NO. URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN Rp79,041,620.00


II PEKERJAAN TANAH Rp31,150,231.60
III PEKERJAAN PONDASI Rp76,760,810.48
IV PEKERJAAN BETON Rp575,706,714.85
V PEKERJAAN BESI & ALLUMUNIUM Rp272,162,281.94
VI PEKERJAAN PASANGAN DINDING Rp71,529,345.64
VII PEKERJAAN PLESTERAN Rp139,873,026.82
VIII PEKERJAAN PENUTUP LANTAI & DINDING Rp135,145,003.45
IX PEKERJAAN LANGIT-LANGIT Rp21,355,712.56
X PEKERJAAN PENUTUP ATAP Rp20,079,444.24
XI PEKERJAAN KAYU Rp57,301,556.84
XII PEKERJAAN KUNCI & KACA Rp15,291,464.40
XIII PEKERJAAN PENGECATAN Rp26,021,680.79
XIV PEKERJAAN SANITASI DALAM GEDUNG Rp20,849,328.91
JUMLAH Rp1,542,268,222.52
OVERHEAD 5% Rp77,113,411.13
PROFIT JASA PEMBORONG 7% Rp107,958,775.58
PPN 10% Rp154,226,822.25
JUMLAH TOTAL Rp1,881,567,231.48
DIBULATKAN Rp1,881,570,000.00
Terbilang: Satu Miliar Delapan Ratus Delapan Puluh Satu Juta Lima Ratus Tujuh Puluh Ribu Rupiah

Semarang, April 2017


Mengetahui,
Guru Pembimbing Estimator

Agus Susilo, S.Pd. Fadhel Muhammad Ruth Mega Joestantika


NIP. 19831017 201101 1 007 1312478 1312497

Shigit Lukmana Yorick Pramulias Inkardo


1312500 1312503
NETWORK PLANNING
PERENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

DURASI
NO. URAIAN PEKERJAAN
(MINGGU)

A PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m 1
2 Pengukuran dan Pemasangan Bouwplank 1
3 Pembuatan Gudang Semen dan Peralatan 1
4 Pembuatan Bedeng Pekerja 1
5 Membersihkan Lapangan dan Perataan 1
6 Air Kerja 20

II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m 2
2 Menggali Tanah Biasa Sedalam 2 m 1
3 Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian 1
4 Pemadatan Tanah (per 20 cm) 1
5 Urugan Pasir 3
6 Mengurug Tanah 2

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah 1SP : 3 PP 2
2 Pemasang Batu Kosong/Anstamping 2

IV PEKERJAAN BETON

1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 1

2 Pekerjaan Footplat
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
3 Pekerjaan Sloof
- Memasang Bekisting untuk Sloof 2
- Pembesian dg Besi Polos atau Besi Ulir 2
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 2
4 Pekerjaan Kolom Struktur LT.1
- Memasang Bekisting untuk Kolom 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
5 Pekerjaan Kolom Praktis LT.1
- Memasang Bekisting untuk Kolom 2
- Pembesian dg Besi Polos atau Besi Ulir 2
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 2
6 Pekerjaan Balok Latei LT.1
- Memasang Bekisting untuk Balok Latei 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
7 Pekerjaan Topi-Topi LT.1
- Memasang Bekisting untuk Topi-Topi 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
8 Pekerjaan Tutup Septictank & Groundtank
- Memasang Bekisting untuk Tutup Septictank & Groundtank 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1

V PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Kusen Pintu Allumunium 1
2 Pemasangan Pintu Kaca Rangka Allumunium 1

VI PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
1 1
1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 2
1SP : 5PP

VII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm 1
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 2
3 Pemasangan Acian 2

VIII PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm 2
2 Pemasangan Lantai Keramik 25 x 25 cm 1
3 Pemasangan Plint Granit Ukuran 10 x 60 cm 1
4 Pemasangan Dinding Keramik 25 x 40 cm, 1
5 Pemasangan Paving Block Natural Tebal 8 Cm 1

IX PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm &
1 2
Rangka Allumunium
2 List Langit-Langit Gypsum Profil 1

X PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil 1
2 Pemasangan Genteng Bubung Plentong 1
XI PEKERJAAN KAYU
1 Pemasangan konstruksi Gording, Kayu Klas II 1
2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II 1
3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 1

XII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa 1
2 Pemasangan Kunci Kamar Mandi 1
3 Pemasangan Engsel Pintu 1
4 Pemasangan Engsel Jendela Kupu-kupu 1
5 Pemasangan Kait Angin 1
6 Pemasangan Kaca tebal 5 mm 1

XIII PEKERJAAN PENGECATAN

1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 1

2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) 2

XIV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok 1
2 Pemasangan Wastafel 1
3 Memasang Bak Mandi Batu Bata Vol. 0,30 m3 1
4 Pemasangan Bak Cuci Piring Stainless stell 1
5 Pemasangan Floor Drain 1
6 Pemasangan Kran Ø ½" atau Ø ¾" 1
7 Pemasangan Pipa PVC tipe AW Ø ¾" 2
8 Pemasangan Pipa PVC tipe AW Ø 4" 2

B PEKERJAAN LANTAI 2
XV PEKERJAAN BETON
1 Pekerjaan Balok
- Memasang Bekisting untuk Balok 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
2 Pekerjaan Plat Lantai 2
- Memasang Bekisting untuk Lantai 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
3 Pekerjaan Kolom Struktur LT.2
- Memasang Bekisting untuk Kolom 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
4 Pekerjaan Kolom Praktis LT.2
- Memasang Bekisting untuk Kolom 2
- Pembesian dg Besi Polos atau Besi Ulir 2
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 2
5 Pekerjaan Balok Latei LT.2
- Memasang Bekisting untuk Balok Latei 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
6 Pekerjaan Topi-Topi LT.2
- Memasang Bekisting untuk Topi-Topi 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
7 Pekerjaan Ring Balk
- Memasang Bekisting untuk Ring Balk 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
8 Pekerjaan Struktur Kuda-Kuda Gunungan
- Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
9 Pekerjaan Tangga
- Memasang Bekisting untuk Tangga 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1
10 Pekerjaan Plat Dak Tandon
- Memasang Bekisting untuk Lantai 1
- Pembesian dg Besi Polos atau Besi Ulir 1
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58 1

XVI PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Besi Profil 2
2 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja) 2
3 Pemasangan Kusen Pintu Allumunium 1
4 Pemasangan Pintu Kaca Rangka Allumunium 1

XVII PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
1 1
1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp.
2 2
1SP : 5PP

XVIII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm 1
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm 2
3 Pemasangan Acian 2
XIX PEKERJAAN PENUTUP LANTAI dan DINDING
1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm 2
2 Pemasangan Lantai Keramik 25 x 25 cm 1
3 Pemasangan Plint Granit Ukuran 10 x 60 cm 1
4 Pemasangan Dinding Keramik 25 x 40 cm, 1

XX PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm &
1 2
Rangka Allumunium
2 List Langit-Langit Gypsum Profil 1

XXI PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil 1
2 Pemasangan Genteng Bubung Plentong 1

XXII PEKERJAAN KAYU


Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III
1 1
Bentang 6 meter
2 Pemasangan konstruksi Gording, Kayu Klas II 1
3 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II 2
4 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II 2

XXIII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa 1
2 Pemasangan Kunci Kamar Mandi 1
3 Pemasangan Engsel Pintu 1
4 Pemasangan Engsel Jendela Kupu-kupu 1
5 Pemasangan Kait Angin 1
6 Pemasangan Rel Pintu Dorong 1
7 Pemasangan Kaca tebal 5 mm 1

XXIV PEKERJAAN PENGECATAN

1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup) 1

2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup) 2

XXV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok 1
2 Pemasangan Floor Drain 1
3 Pemasangan Kran Ø ½" atau Ø ¾" 1
4 Pemasangan Pipa PVC tipe AW Ø ¾" 1
5 Pemasangan Pipa PVC tipe AW Ø 4" 1
NO. URAIAN PEKERJAAN

A PEKERJAAN LANTAI 1
I PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
2 Pengukuran dan Pemasangan Bouwplank
3 Pembuatan Gudang Semen dan Peralatan
4 Pembuatan Bedeng Pekerja
5 Membersihkan Lapangan dan Perataan
6 Air Kerja

II PEKERJAAN TANAH
1 Menggali Tanah Biasa Sedalam 1 m
2 Menggali Tanah Biasa Sedalam 2 m
3 Pengurugan Kembali
4 Pemadatan Tanah (per 20 cm)
5 Urugan Pasir
6 Mengurug Tanah

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah 1SP : 3 PP
2 Pemasang Batu Kosong/Anstamping

IV PEKERJAAN BETON
1 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
2 Pekerjaan Footplat
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
3 Pekerjaan Sloof
- Memasang Bekisting untuk Sloof
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
4 Pekerjaan Kolom Struktur LT.1
- Memasang Bekisting untuk Kolom
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
5 Pekerjaan Kolom Praktis LT.1
- Memasang Bekisting untuk Kolom
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
6 Pekerjaan Balok Latei LT.1
- Memasang Bekisting untuk Balok Latei
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
7 Pekerjaan Topi-Topi LT.1
- Memasang Bekisting untuk Topi-Topi
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
8 Pekerjaan Tutup Septictank & Groundtank
- Memasang Bekisting untuk Tutup Septictank & Groundtank
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

V PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Kusen Pintu Allumunium
2 Pemasangan Pintu Kaca Rangka Allumunium

VI PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

VII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
3 Pemasangan Acian

VIII PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm
2 Pemasangan Lantai Keramik 25 x 25 cm
3 Pemasangan Plint Granit Ukuran 10 x 60 cm
4 Pemasangan Dinding Keramik 25 x 40 cm,
5 Pemasangan Paving Block Natural Tebal 8 Cm

IX PEKERJAAN LANGIT-LANGIT
1 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium
2 List Langit-Langit Gypsum Profil

X PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil
2 Pemasangan Genteng Bubung Plentong

XI PEKERJAAN KAYU
1 Pemasangan konstruksi Gording, Kayu Klas II
2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
3 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

XII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa
2 Pemasangan Kunci Kamar Mandi
3 Pemasangan Engsel Pintu
4 Pemasangan Engsel Jendela Kupu-kupu
5 Pemasangan Kait Angin
6 Pemasangan Kaca tebal 5 mm

XIII PEKERJAAN PENGECATAN


1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)

XIV PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Closet Duduk / Mono Blok
2 Pemasangan Wastafel
3 Memasang Bak Mandi Batu Bata Vol. 0,30 m3
4 Pemasangan Bak Cuci Piring Stainless stell
5 Pemasangan Floor Drain
6 Pemasangan Kran Ø ½" atau Ø ¾"
7 Pemasangan Pipa PVC tipe AW Ø ¾"
8 Pemasangan Pipa PVC tipe AW Ø 4"

B PEKERJAAN LANTAI 2
XV PEKERJAAN BETON
1 Pekerjaan Balok
- Memasang Bekisting untuk Balok
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
2 Pekerjaan Plat Lantai 2
- Memasang Bekisting untuk Lantai
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
3 Pekerjaan Kolom Struktur LT.2
- Memasang Bekisting untuk Kolom
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
4 Pekerjaan Kolom Praktis LT.2
- Memasang Bekisting untuk Kolom
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
5 Pekerjaan Balok Latei LT.2
- Memasang Bekisting untuk Balok Latei
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
6 Pekerjaan Topi-Topi LT.2
- Memasang Bekisting untuk Topi-Topi
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
7 Pekerjaan Ring Balk
- Memasang Bekisting untuk Ring Balk
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
8 Pekerjaan Struktur Kuda-Kuda Gunungan
- Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
9 Pekerjaan Tangga
- Memasang Bekisting untuk Tangga
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
10 Pekerjaan Plat Dak Tandon
- Memasang Bekisting untuk Lantai
- Pembesian dg Besi Polos atau Besi Ulir
- Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

XVI PEKERJAAN BESI & ALLUMUNIUM


1 Pemasangan Besi Profil
2 Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
3 Pemasangan Kusen Pintu Allumunium
4 Pemasangan Pintu Kaca Rangka Allumunium

XVII PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

XVIII PEKERJAAN PLESTERAN


1 Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
2 Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
3 Pemasangan Acian

XIX PEKERJAAN PENUTUP LANTAI dan DINDING


1 Pemasangan lantai Ubin Granito Uk. 60 x 60 cm
2 Pemasangan Lantai Keramik 25 x 25 cm
3 Pemasangan Plint Granit Ukuran 10 x 60 cm
4 Pemasangan Dinding Keramik 25 x 40 cm,

XX PEKERJAAN LANGIT-LANGIT
1 Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium
2 List Langit-Langit Gypsum Profil

XXI PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Plentong Kecil
2 Pemasangan Genteng Bubung Plentong

XXII PEKERJAAN KAYU


1 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter
2 Pemasangan konstruksi Gording, Kayu Klas II
3 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
4 Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

XXIII PEKERJAAN KUNCI dan KACA


1 Pemasangan Kunci Tanam Biasa
2 Pemasangan Kunci Kamar Mandi
3 Pemasangan Engsel Pintu
4 Pemasangan Engsel Jendela Kupu-kupu
5 Pemasangan Kait Angin
6 Pemasangan Rel Pintu Dorong
7 Pemasangan Kaca tebal 5 mm

XXIV PEKERJAAN PENGECATAN


1 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)
XXV PEKERJAAN SANITASI DALAM GEDUNG
1 Pemasangan Closet Duduk / Mono Blok
2 Pemasangan Floor Drain
3 Pemasangan Kran Ø ½" atau Ø ¾"
4 Pemasangan Pipa PVC tipe AW Ø ¾"
5 Pemasangan Pipa PVC tipe AW Ø 4"
JUMLAH
JUMLAH KOMULTIF
PRESENTASE PEKERJAAN

Mengetahui,
Guru Pembimbing

Agus Susilo, S.Pd.


NIP. 19831017 201101 1 007
TIME SCHE
PERENCANAAN KANTOR KE
JL. JOLOTUNDO II NO

HARGA SATUAN DURASI


VOLUME SAT JUMLAH BOBOT
PEKERJAAN (MINGGU)

70 m' Rp534,965.00 Rp37,447,550.00 2.428 1


78 m' Rp124,790.00 Rp9,733,620.00 0.631 1
6 m2 Rp1,534,575.00 Rp9,207,450.00 0.597 1
9 m2 Rp1,517,000.00 Rp13,653,000.00 0.885 1
300 m2 Rp10,000.00 Rp3,000,000.00 0.195 1
1 ls Rp6,000,000.00 Rp6,000,000.00 0.389 20

197.331 m3 Rp47,000.00 Rp9,274,557.00 0.601 2


70.161 m3 Rp57,600.00 Rp4,041,273.60 0.262 1
115.483 m3 Rp34,000.00 Rp3,926,422.00 0.255 1
51.129 m3 Rp34,000.00 Rp1,738,386.00 0.113 1
43.8 m3 Rp258,000.00 Rp11,300,400.00 0.733 3
51.129 m3 Rp17,000.00 Rp869,193.00 0.056 2

73.036 m3 Rp821,450.00 Rp59,995,422.20 3.890 2


35.741 m3 Rp469,080.00 Rp16,765,388.28 1.087 2

3.496 m3 Rp845,611.48 Rp2,956,257.74 0.192 1

1763.937 Kg Rp10,167.50 Rp17,934,829.45 1.163 1


22.856 m3 Rp990,233.61 Rp22,632,779.42 1.467 1

101.015 m2 Rp149,620.00 Rp15,113,864.30 0.980 2


1277.087 Kg Rp10,167.50 Rp12,984,782.07 0.842 2
7.64 m3 Rp990,233.61 Rp7,565,384.79 0.491 2

233.688 m2 Rp324,810.00 Rp75,904,199.28 4.922 1


3478.929 Kg Rp10,167.50 Rp35,372,010.61 2.294 1
19.492 m3 Rp990,233.61 Rp19,301,633.55 1.252 1

36.096 m2 Rp324,810.00 Rp11,724,341.76 0.760 2


1098.074 Kg Rp10,167.50 Rp11,164,667.40 0.724 2
4.685 m3 Rp990,233.61 Rp4,639,244.47 0.301 2

22.654 m2 Rp149,620.00 Rp3,389,491.48 0.220 1


83.18 Kg Rp10,167.50 Rp845,732.65 0.055 1
1.618 m3 Rp990,233.61 Rp1,602,197.98 0.104 1
12.72 m2 Rp408,810.00 Rp5,200,063.20 0.337 1
60.853 Kg Rp10,167.50 Rp618,722.88 0.040 1
0.873 m3 Rp990,233.61 Rp864,473.94 0.056 1

15 m2 Rp282,810.00 Rp4,242,150.00 0.275 1


266.4 Kg Rp10,167.50 Rp2,708,622.00 0.176 1
0.716 m3 Rp990,233.61 Rp709,007.27 0.046 1

148.72 m' Rp98,860.00 Rp14,702,459.20 0.953 1


38.16 m2 Rp400,685.00 Rp15,290,139.60 0.991 1

139.801 m2 Rp97,088.50 Rp13,573,069.39 0.880 1


376.473 m2 Rp93,714.00 Rp35,280,790.72 2.288 2

255.695 m2 Rp53,936.40 Rp13,791,267.80 0.894 1


752.946 m2 Rp60,667.60 Rp45,679,426.75 2.962 2
984.734 m2 Rp24,612.50 Rp24,236,765.58 1.572 2

126.72 m2 Rp334,909.17 Rp42,439,690.36 2.752 2


10.438 m2 Rp167,743.75 Rp1,750,909.26 0.114 1
121.97 m' Rp41,991.02 Rp5,121,644.32 0.332 1
13.078 m2 Rp191,935.00 Rp2,510,125.93 0.163 1
104.943 m2 Rp231,604.00 Rp24,305,218.57 1.576 1

134.502 m2 Rp47,665.00 Rp6,411,037.83 0.416 2


179.78 m1 Rp26,040.00 Rp4,681,471.20 0.304 1

11.001 m2 Rp73,440.00 Rp807,913.44 0.052 1


1.93 m' Rp104,280.00 Rp201,260.40 0.013 1

0.1 m3 Rp8,564,400.00 Rp856,440.00 0.056 1


11.001 m2 Rp139,240.00 Rp1,531,779.24 0.099 1
9.56 m' Rp107,400.00 Rp1,026,744.00 0.067 1

9 Buah Rp179,400.00 Rp1,614,600.00 0.105 1


3 Buah Rp123,450.00 Rp370,350.00 0.024 1
76 Buah Rp20,100.00 Rp1,527,600.00 0.099 1
56 Buah Rp13,400.00 Rp750,400.00 0.049 1
82 Buah Rp19,140.00 Rp1,569,480.00 0.102 1
17.46 m2 Rp112,560.00 Rp1,965,297.60 0.127 1

4.971 m2 Rp34,410.00 Rp171,052.11 0.011 1


984.734 m2 Rp15,132.00 Rp14,900,994.89 0.966 2

3 Unit Rp1,618,390.00 Rp4,855,170.00 0.315 1


2 Unit Rp471,275.00 Rp942,550.00 0.061 1
3 Unit Rp1,173,790.24 Rp3,521,370.73 0.228 1
1 buah Rp303,200.00 Rp303,200.00 0.020 1
7 buah Rp24,400.00 Rp170,800.00 0.011 1
7 bh Rp49,607.50 Rp347,252.50 0.023 1
46.4296 m' Rp20,535.00 Rp953,431.84 0.062 2
54.124 m' Rp77,110.00 Rp4,173,501.64 0.271 2

125.585 m2 Rp341,310.00 Rp42,863,416.35 2.779 1


4571.184 Kg Rp10,167.50 Rp46,477,513.32 3.014 1
11.488 m3 Rp990,233.61 Rp11,375,803.72 0.738 1

163.245 m2 Rp408,810.00 Rp66,736,188.45 4.327 1


2450.968 Kg Rp10,167.50 Rp24,920,217.14 1.616 1
21.221 m3 Rp990,233.61 Rp21,013,747.46 1.363 1

62.586 m2 Rp324,810.00 Rp20,328,558.66 1.318 1


475.366 Kg Rp10,167.50 Rp4,833,283.81 0.313 1
3.129 m3 Rp990,233.61 Rp3,098,440.97 0.201 1

28.776 m2 Rp324,810.00 Rp9,346,732.56 0.606 2


634.082 Kg Rp10,167.50 Rp6,447,028.74 0.418 2
2.158 m3 Rp990,233.61 Rp2,136,924.13 0.139 2

15.956 m2 Rp149,620.00 Rp2,387,336.72 0.155 1


194.567 Kg Rp10,167.50 Rp1,978,259.97 0.128 1
1.140 m3 Rp990,233.61 Rp1,128,866.32 0.073 1

11.715 m2 Rp408,810.00 Rp4,789,209.15 0.311 1


56.046 Kg Rp10,167.50 Rp569,847.71 0.037 1
0.803 m3 Rp990,233.61 Rp795,157.59 0.052 1

71.825 m2 Rp149,620.00 Rp10,746,456.50 0.697 1


907.219 Kg Rp10,167.50 Rp9,224,149.18 0.598 1
5.387 m3 Rp990,233.61 Rp5,334,388.46 0.346 1

14.148 m2 Rp149,620.00 Rp2,116,823.76 0.137 1


554.252 Kg Rp10,167.50 Rp5,635,357.21 0.365 1
1.978 m3 Rp990,233.61 Rp1,958,682.08 0.127 1

11.494 m2 Rp304,360.00 Rp3,498,313.84 0.227 1


341.966 Kg Rp10,167.50 Rp3,476,939.31 0.225 1
2.526 m3 Rp990,233.61 Rp2,501,330.10 0.162 1

3.750 m2 Rp408,810.00 Rp1,533,037.50 0.099 1


48.980 Kg Rp10,167.50 Rp498,004.15 0.032 1
0.487 m3 Rp990,233.61 Rp482,243.77 0.031 1

1602.475 Kg Rp23,255.00 Rp37,265,556.13 2.416 2


2082.475 kg Rp84,740.00 Rp176,468,931.50 11.442 2
143.480 m' Rp98,860.00 Rp14,184,432.80 0.920 1
35.566 m2 Rp400,685.00 Rp14,250,762.71 0.924 1

54.175 m2 Rp97,088.50 Rp5,259,769.49 0.341 1


185.839 m2 Rp93,714.00 Rp17,415,716.05 1.129 2

108.350 m2 Rp53,936.40 Rp5,844,008.94 0.379 1


571.678 m2 Rp60,667.60 Rp34,682,332.23 2.249 2
635.418 m2 Rp24,612.50 Rp15,639,225.53 1.014 2

153.456 m2 Rp334,909.17 Rp51,393,822.00 3.332 2


5.671 m2 Rp167,743.75 Rp951,274.81 0.062 1
118.730 m' Rp41,991.02 Rp4,985,593.42 0.323 1
8.788 m2 Rp191,935.00 Rp1,686,724.78 0.109 1

145.162 m2 Rp47,665.00 Rp6,919,146.73 0.449 2


128.420 m1 Rp26,040.00 Rp3,344,056.80 0.217 1

247.460 m2 Rp73,440.00 Rp18,173,462.40 1.178 1


8.600 m' Rp104,280.00 Rp896,808.00 0.058 1

0.534 m3 Rp9,101,200.00 Rp4,860,040.80 0.315 1


0.766 m3 Rp8,564,400.00 Rp6,560,330.40 0.425 1
247.460 m2 Rp139,240.00 Rp34,456,330.40 2.234 2
74.580 m' Rp107,400.00 Rp8,009,892.00 0.519 2

5.000 Buah Rp179,400.00 Rp897,000.00 0.058 1


2.000 Buah Rp123,450.00 Rp246,900.00 0.016 1
34.000 Buah Rp20,100.00 Rp683,400.00 0.044 1
88.000 Buah Rp13,400.00 Rp1,179,200.00 0.076 1
100.000 Buah Rp19,140.00 Rp1,914,000.00 0.124 1
1.000 Buah Rp234,240.00 Rp234,240.00 0.015 1
20.780 m2 Rp112,560.00 Rp2,338,996.80 0.152 1

38.782 m2 Rp34,410.00 Rp1,334,488.62 0.087 1


635.418 m2 Rp15,132.00 Rp9,615,145.18 0.623 2
2.000 Unit Rp1,618,390.00 Rp3,236,780.00 0.210 1
2.000 buah Rp24,400.00 Rp48,800.00 0.003 1
2.000 bh Rp49,607.50 Rp99,215.00 0.006 1
19.898 m' Rp20,535.00 Rp408,613.64 0.026 1
23.196 m' Rp77,110.00 Rp1,788,643.56 0.116 1
Rp1,542,268,222.52 100.00
UMLAH KOMULTIF
ENTASE PEKERJAAN
TIME SCHEDULE
ENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

BULAN 1 BULAN 2 BULAN 3


1 2 3 4 5 6 7 8 9

2.428
0.631
0.597
0.885
0.195
0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

0.301 0.301
0.262
0.255

0.244 0.244

1.945 1.945
0.544 0.544

0.192

1.163
1.467

0.490 0.490
0.421 0.421
0.245 0.245

4.922
2.294
1.252
0.275
0.176
0.046
2.779

4.327
0.116

2.448 0.845 1.502 2.440 2.025 3.908 3.919 8.486 7.242


2.448 3.293 4.794 7.234 9.260 13.168 17.087 25.573 32.815

Fadhel Muhammad
BULAN 3 BULAN 4 BULAN 5
10 11 12 13 14 15 16 17 18

0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019 0.019

0.113
0.244
0.028 0.028

0.380 0.380
0.362 0.362
0.150 0.150

0.220
0.055
0.104
0.337
0.040
0.056

0.953

0.880
1.144 1.144

0.894
1.481 1.481
0.786 0.786

1.376 1.376
0.114
0.332
0.163
1.576

0.208 0.208
0.304

0.052
0.013

0.056
0.099
0.067

0.011
0.483 0.483

0.315
0.061
0.228
0.020
0.011
0.023
0.031 0.031
0.135 0.135

3.014
0.738

1.616
1.363

1.318
0.313
0.201

0.303 0.303
0.209 0.209
0.069 0.069

0.155
0.128
0.073

0.311
0.037
0.052

0.697
0.598
0.346

0.137
0.365
0.127

0.227
0.225
0.162

0.099
0.032
0.031

1.208 1.208
5.721 5.721
0.920

0.341
0.565 0.565

0.379
1.124 1.124
0.507 0.507

1.666 1.666
0.062
0.323
0.109

0.224 0.224
0.217

1.178
0.058

0.315
0.425
1.117 1.117
0.260 0.260

0.087
0.312 0.312
0.210
0.003
0.006
0.026

6.912 7.203 11.111 12.037 9.618 4.950 4.014 4.784 3.608


39.727 46.930 58.042 70.079 79.697 84.648 88.662 93.446 97.054

Semarang, April 2017

Estimator

Fadhel Muhammad Ruth Mega Joestantika Shigit Lukmana Yorick Pramulias Inkardo
1312478 1312497 1312500
BULAN 5
PRESENTASE
19 20

100%

0.019 0.019
75%
0.991

0.105
0.024
0.099
0.049
0.102
0.127
50%
25%
0.924

0.058
0.016
0.044
0.076
0.124
0.015
0.152
0%

1.935 1.011
98.989 100.000

Yorick Pramulias Inkardo


1312503
NO.

A
I
1
2
3
4
5
6

II
1
2
3
4
5
6

III
1
2

IV
1
2
-
-
3
-
-
-
4
-
-
-
5
-
-
-
6
-
-
-
7
-
-
-
8
-
-
-

V
1
2

VI
1
2

VII
1
2
3

VIII
1
2
3
4
5

IX
1
2

X
1
2

XI
1
2
3

XII
1
2
3
4
5
6

XIII
1
2

XIV
1
2
3
4
5
6
7
8

B
XV
1
-
-
-
2
-
-
-
3
-
-
-
4
-
-
-
5
-
-
-
6
-
-
-
7
-
-
-
8
-
-
-
9
-
-
-
10
-
-
-

XVI
1
2
3
4

XVII
1
2

XVIII
1
2
3

XIX
1
2
3
4

XX
1
2

XXI
1
2

XXII
1
2
3
4

XXIII
1
2
3
4
5
6
7

XXIV
1
2

XXV
1
2
3
4
5
JUMLAH
JUMLAH KOMULATIF
PRESENTASE PEKERJA
URAIAN PEKERJAAN

PEKERJAAN LANTAI 1
PEKERJAAN PERSIAPAN
Pagar Sementara dari Seng Gelombang Tinggi 2,00 m
Pengukuran dan Pemasangan Bouwplank
Pembuatan Gudang Semen dan Peralatan
Pembuatan Bedeng Pekerja
Membersihkan Lapangan dan Perataan
Air Kerja

PEKERJAAN TANAH
Menggali Tanah Biasa Sedalam 1 m
Menggali Tanah Biasa Sedalam 2 m
Pengurugan Kembali
Pemadatan Tanah (per 20 cm)
Urugan Pasir
Mengurug Tanah

PEKERJAAN PONDASI
Pemasangan Pondasi Batu Belah 1SP : 3 PP
Pemasang Batu Kosong/Anstamping

PEKERJAAN BETON
Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
Pekerjaan Footplat
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Sloof
Memasang Bekisting untuk Sloof
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Kolom Struktur LT.1
Memasang Bekisting untuk Kolom
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Kolom Praktis LT.1
Memasang Bekisting untuk Kolom
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Balok Latei LT.1
Memasang Bekisting untuk Balok Latei
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Topi-Topi LT.1
Memasang Bekisting untuk Topi-Topi
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Tutup Septictank & Groundtank
Memasang Bekisting untuk Tutup Septictank & Groundtank
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

PEKERJAAN BESI & ALLUMUNIUM


Pemasangan Kusen Pintu Allumunium
Pemasangan Pintu Kaca Rangka Allumunium

PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

PEKERJAAN PLESTERAN
Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
Pemasangan Acian

PEKERJAAN PENUTUP LANTAI dan DINDING


Pemasangan lantai Ubin Granito Uk. 60 x 60 cm
Pemasangan Lantai Keramik 25 x 25 cm
Pemasangan Plint Granit Ukuran 10 x 60 cm
Pemasangan Dinding Keramik 25 x 40 cm,
Pemasangan Paving Block Natural Tebal 8 Cm

PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium
List Langit-Langit Gypsum Profil

PEKERJAAN PENUTUP ATAP


Pemasangan Atap Genteng Plentong Kecil
Pemasangan Genteng Bubung Plentong

PEKERJAAN KAYU
Pemasangan konstruksi Gording, Kayu Klas II
Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

PEKERJAAN KUNCI dan KACA


Pemasangan Kunci Tanam Biasa
Pemasangan Kunci Kamar Mandi
Pemasangan Engsel Pintu
Pemasangan Engsel Jendela Kupu-kupu
Pemasangan Kait Angin
Pemasangan Kaca tebal 5 mm

PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)

PEKERJAAN SANITASI DALAM GEDUNG


Pemasangan Closet Duduk / Mono Blok
Pemasangan Wastafel
Memasang Bak Mandi Batu Bata Vol. 0,30 m3
Pemasangan Bak Cuci Piring Stainless stell
Pemasangan Floor Drain
Pemasangan Kran Ø ½" atau Ø ¾"
Pemasangan Pipa PVC tipe AW Ø ¾"
Pemasangan Pipa PVC tipe AW Ø 4"

PEKERJAAN LANTAI 2
PEKERJAAN BETON
Pekerjaan Balok
Memasang Bekisting untuk Balok
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Plat Lantai 2
Memasang Bekisting untuk Lantai
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Kolom Struktur LT.2
Memasang Bekisting untuk Kolom
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Kolom Praktis LT.2
Memasang Bekisting untuk Kolom
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Balok Latei LT.2
Memasang Bekisting untuk Balok Latei
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Topi-Topi LT.2
Memasang Bekisting untuk Topi-Topi
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Ring Balk
Memasang Bekisting untuk Ring Balk
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Struktur Kuda-Kuda Gunungan
Memasang Bekisting untuk Struktur Kuda-Kuda Gunungan
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Tangga
Memasang Bekisting untuk Tangga
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
Pekerjaan Plat Dak Tandon
Memasang Bekisting untuk Lantai
Pembesian dg Besi Polos atau Besi Ulir
Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58

PEKERJAAN BESI & ALLUMUNIUM


Pemasangan Besi Profil
Pengerjaan Pekerjaan Perakitan (Kuda-kuda Baja)
Pemasangan Kusen Pintu Allumunium
Pemasangan Pintu Kaca Rangka Allumunium

PEKERJAAN PASANGAN DINDING


Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP

PEKERJAAN PLESTERAN
Pemasangan Plesteran 1Pc : 3Pp Tebal 20 mm
Pemasangan Plesteran 1Pc : 5Pp Tebal 20 mm
Pemasangan Acian

PEKERJAAN PENUTUP LANTAI dan DINDING


Pemasangan lantai Ubin Granito Uk. 60 x 60 cm
Pemasangan Lantai Keramik 25 x 25 cm
Pemasangan Plint Granit Ukuran 10 x 60 cm
Pemasangan Dinding Keramik 25 x 40 cm,

PEKERJAAN LANGIT-LANGIT
Memasang Langit-langit Gypsum Board, Ukuran (120x240) tebal 9 mm & Rangka Allumunium
List Langit-Langit Gypsum Profil

PEKERJAAN PENUTUP ATAP


Pemasangan Atap Genteng Plentong Kecil
Pemasangan Genteng Bubung Plentong

PEKERJAAN KAYU
Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter
Pemasangan konstruksi Gording, Kayu Klas II
Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II
Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II

PEKERJAAN KUNCI dan KACA


Pemasangan Kunci Tanam Biasa
Pemasangan Kunci Kamar Mandi
Pemasangan Engsel Pintu
Pemasangan Engsel Jendela Kupu-kupu
Pemasangan Kait Angin
Pemasangan Rel Pintu Dorong
Pemasangan Kaca tebal 5 mm

PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 2 Lp Cat Penutup)
Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 Lap.Cat Penutup)

PEKERJAAN SANITASI DALAM GEDUNG


Pemasangan Closet Duduk / Mono Blok
Pemasangan Floor Drain
Pemasangan Kran Ø ½" atau Ø ¾"
Pemasangan Pipa PVC tipe AW Ø ¾"
Pemasangan Pipa PVC tipe AW Ø 4"
JUMLAH
JUMLAH KOMULATIF
PRESENTASE PEKERJAAN

Mengetahui,
Guru Pembimbing

Agus Susilo, S.Pd.


NIP. 19831017 201101 1 007
HARGA SATUAN DURASI
VOLUME SAT JUMLAH BOBOT
PEKERJAAN (MINGGU)

70 m' Rp534,965.00 Rp37,447,550.00 2.428 1


78 m' Rp124,790.00 Rp9,733,620.00 0.631 1
6 m2 Rp1,534,575.00 Rp9,207,450.00 0.597 1
9 m2 Rp1,517,000.00 Rp13,653,000.00 0.885 1
300 m2 Rp10,000.00 Rp3,000,000.00 0.195 1
1 ls Rp6,000,000.00 Rp6,000,000.00 0.389 20

197.331 m3 Rp47,000.00 Rp9,274,557.00 0.601 2


70.161 m3 Rp57,600.00 Rp4,041,273.60 0.262 1
115.483 m3 Rp34,000.00 Rp3,926,422.00 0.255 1
51.129 m3 Rp34,000.00 Rp1,738,386.00 0.113 1
43.8 m3 Rp258,000.00 Rp11,300,400.00 0.733 3
51.129 m3 Rp17,000.00 Rp869,193.00 0.056 2

73.036 m3 Rp821,450.00 Rp59,995,422.20 3.890 2


35.741 m3 Rp469,080.00 Rp16,765,388.28 1.087 2

3.496 m3 Rp845,611.48 Rp2,956,257.74 0.192 1

1763.937 Kg Rp10,167.50 Rp17,934,829.45 1.163 1


22.856 m3 Rp990,233.61 Rp22,632,779.42 1.467 1

101.015 m2 Rp149,620.00 Rp15,113,864.30 0.980 2


1277.087 Kg Rp10,167.50 Rp12,984,782.07 0.842 2
7.64 m3 Rp990,233.61 Rp7,565,384.79 0.491 2

233.688 m2 Rp324,810.00 Rp75,904,199.28 4.922 1


3478.929 Kg Rp10,167.50 Rp35,372,010.61 2.294 1
19.492 m3 Rp990,233.61 Rp19,301,633.55 1.252 1

36.096 m2 Rp324,810.00 Rp11,724,341.76 0.760 2


1098.074 Kg Rp10,167.50 Rp11,164,667.40 0.724 2
4.685 m3 Rp990,233.61 Rp4,639,244.47 0.301 2

22.654 m2 Rp149,620.00 Rp3,389,491.48 0.220 1


83.18 Kg Rp10,167.50 Rp845,732.65 0.055 1
1.618 m3 Rp990,233.61 Rp1,602,197.98 0.104 1

12.72 m2 Rp408,810.00 Rp5,200,063.20 0.337 1


60.853 Kg Rp10,167.50 Rp618,722.88 0.040 1
0.873 m3 Rp990,233.61 Rp864,473.94 0.056 1

15 m2 Rp282,810.00 Rp4,242,150.00 0.275 1


266.4 Kg Rp10,167.50 Rp2,708,622.00 0.176 1
0.716 m3 Rp990,233.61 Rp709,007.27 0.046 1

148.72 m' Rp98,860.00 Rp14,702,459.20 0.953 1


38.16 m2 Rp400,685.00 Rp15,290,139.60 0.991 1

139.801 m2 Rp97,088.50 Rp13,573,069.39 0.880 1


376.473 m2 Rp93,714.00 Rp35,280,790.72 2.288 2

255.695 m2 Rp53,936.40 Rp13,791,267.80 0.894 1


752.946 m2 Rp60,667.60 Rp45,679,426.75 2.962 2
984.734 m2 Rp24,612.50 Rp24,236,765.58 1.572 2

126.72 m2 Rp334,909.17 Rp42,439,690.36 2.752 2


10.438 m2 Rp167,743.75 Rp1,750,909.26 0.114 1
121.97 m' Rp41,991.02 Rp5,121,644.32 0.332 1
13.078 m2 Rp191,935.00 Rp2,510,125.93 0.163 1
104.943 m2 Rp231,604.00 Rp24,305,218.57 1.576 1

134.502 m2 Rp47,665.00 Rp6,411,037.83 0.416 2


179.78 m1 Rp26,040.00 Rp4,681,471.20 0.304 1

11.001 m2 Rp73,440.00 Rp807,913.44 0.052 1


1.93 m' Rp104,280.00 Rp201,260.40 0.013 1

0.1 m3 Rp8,564,400.00 Rp856,440.00 0.056 1


11.001 m2 Rp139,240.00 Rp1,531,779.24 0.099 1
9.56 m' Rp107,400.00 Rp1,026,744.00 0.067 1

9 Buah Rp179,400.00 Rp1,614,600.00 0.105 1


3 Buah Rp123,450.00 Rp370,350.00 0.024 1
76 Buah Rp20,100.00 Rp1,527,600.00 0.099 1
56 Buah Rp13,400.00 Rp750,400.00 0.049 1
82 Buah Rp19,140.00 Rp1,569,480.00 0.102 1
17.46 m2 Rp112,560.00 Rp1,965,297.60 0.127 1

4.971 m2 Rp34,410.00 Rp171,052.11 0.011 1


984.734 m2 Rp15,132.00 Rp14,900,994.89 0.966 2

3 Unit Rp1,618,390.00 Rp4,855,170.00 0.315 1


2 Unit Rp471,275.00 Rp942,550.00 0.061 1
3 Unit Rp1,173,790.24 Rp3,521,370.73 0.228 1
1 buah Rp303,200.00 Rp303,200.00 0.020 1
7 buah Rp24,400.00 Rp170,800.00 0.011 1
7 bh Rp49,607.50 Rp347,252.50 0.023 1
46.4296 m' Rp20,535.00 Rp953,431.84 0.062 2
54.124 m' Rp77,110.00 Rp4,173,501.64 0.271 2

125.585 m2 Rp341,310.00 Rp42,863,416.35 2.779 1


4571.184 Kg Rp10,167.50 Rp46,477,513.32 3.014 1
11.488 m3 Rp990,233.61 Rp11,375,803.72 0.738 1

163.245 m2 Rp408,810.00 Rp66,736,188.45 4.327 1


2450.968 Kg Rp10,167.50 Rp24,920,217.14 1.616 1
21.221 m3 Rp990,233.61 Rp21,013,747.46 1.363 1

62.586 m2 Rp324,810.00 Rp20,328,558.66 1.318 1


475.366 Kg Rp10,167.50 Rp4,833,283.81 0.313 1
3.129 m3 Rp990,233.61 Rp3,098,440.97 0.201 1

28.776 m2 Rp324,810.00 Rp9,346,732.56 0.606 2


634.082 Kg Rp10,167.50 Rp6,447,028.74 0.418 2
2.158 m3 Rp990,233.61 Rp2,136,924.13 0.139 2

15.956 m2 Rp149,620.00 Rp2,387,336.72 0.155 1


194.567 Kg Rp10,167.50 Rp1,978,259.97 0.128 1
1.140 m3 Rp990,233.61 Rp1,128,866.32 0.073 1

11.715 m2 Rp408,810.00 Rp4,789,209.15 0.311 1


56.046 Kg Rp10,167.50 Rp569,847.71 0.037 1
0.803 m3 Rp990,233.61 Rp795,157.59 0.052 1

71.825 m2 Rp149,620.00 Rp10,746,456.50 0.697 1


907.219 Kg Rp10,167.50 Rp9,224,149.18 0.598 1
5.387 m3 Rp990,233.61 Rp5,334,388.46 0.346 1

14.148 m2 Rp149,620.00 Rp2,116,823.76 0.137 1


554.252 Kg Rp10,167.50 Rp5,635,357.21 0.365 1
1.978 m3 Rp990,233.61 Rp1,958,682.08 0.127 1
11.494 m2 Rp304,360.00 Rp3,498,313.84 0.227 1
341.966 Kg Rp10,167.50 Rp3,476,939.31 0.225 1
2.526 m3 Rp990,233.61 Rp2,501,330.10 0.162 1

3.750 m2 Rp408,810.00 Rp1,533,037.50 0.099 1


48.980 Kg Rp10,167.50 Rp498,004.15 0.032 1
0.487 m3 Rp990,233.61 Rp482,243.77 0.031 1

1602.475 Kg Rp23,255.00 Rp37,265,556.13 2.416 2


2082.475 kg Rp84,740.00 Rp176,468,931.50 11.442 2
143.480 m' Rp98,860.00 Rp14,184,432.80 0.920 1
35.566 m2 Rp400,685.00 Rp14,250,762.71 0.924 1

54.175 m2 Rp97,088.50 Rp5,259,769.49 0.341 1


185.839 m2 Rp93,714.00 Rp17,415,716.05 1.129 2

108.350 m2 Rp53,936.40 Rp5,844,008.94 0.379 1


571.678 m2 Rp60,667.60 Rp34,682,332.23 2.249 2
635.418 m2 Rp24,612.50 Rp15,639,225.53 1.014 2

153.456 m2 Rp334,909.17 Rp51,393,822.00 3.332 2


5.671 m2 Rp167,743.75 Rp951,274.81 0.062 1
118.730 m' Rp41,991.02 Rp4,985,593.42 0.323 1
8.788 m2 Rp191,935.00 Rp1,686,724.78 0.109 1

145.162 m2 Rp47,665.00 Rp6,919,146.73 0.449 2


128.420 m1 Rp26,040.00 Rp3,344,056.80 0.217 1

247.460 m2 Rp73,440.00 Rp18,173,462.40 1.178 1


8.600 m' Rp104,280.00 Rp896,808.00 0.058 1

0.534 m3 Rp9,101,200.00 Rp4,860,040.80 0.315 1


0.766 m3 Rp8,564,400.00 Rp6,560,330.40 0.425 1
247.460 m2 Rp139,240.00 Rp34,456,330.40 2.234 2
74.580 m' Rp107,400.00 Rp8,009,892.00 0.519 2

5.000 Buah Rp179,400.00 Rp897,000.00 0.058 1


2.000 Buah Rp123,450.00 Rp246,900.00 0.016 1
34.000 Buah Rp20,100.00 Rp683,400.00 0.044 1
88.000 Buah Rp13,400.00 Rp1,179,200.00 0.076 1
100.000 Buah Rp19,140.00 Rp1,914,000.00 0.124 1
1.000 Buah Rp234,240.00 Rp234,240.00 0.015 1
20.780 m2 Rp112,560.00 Rp2,338,996.80 0.152 1

38.782 m2 Rp34,410.00 Rp1,334,488.62 0.087 1


635.418 m2 Rp15,132.00 Rp9,615,145.18 0.623 2

2.000 Unit Rp1,618,390.00 Rp3,236,780.00 0.210 1


2.000 buah Rp24,400.00 Rp48,800.00 0.003 1
2.000 bh Rp49,607.50 Rp99,215.00 0.006 1
19.898 m' Rp20,535.00 Rp408,613.64 0.026 1
23.196 m' Rp77,110.00 Rp1,788,643.56 0.116 1
Rp1,542,268,222.52 100.00
MLAH KOMULATIF
ENTASE PEKERJAAN
TIME SCHEDULE
PERENCANAAN KANTOR KECAMATAN GAYAMSARI
JL. JOLOTUNDO II NO 77, SEMARANG

BULAN 1 BULAN 2

1 2 3 4 5 6 7

2.428
0.631
0.597
0.885
0.195
0.019 0.019 0.019 0.019 0.019 0.019 0.019

0.301 0.301
0.262
0.255

0.244 0.244

1.945 1.945
0.544 0.544

0.192

1.163
1.467

0.490 0.490
0.421 0.421
0.245 0.245
0.275
0.176
0.046
2.448 0.845 1.502 2.440 2.025 3.908 3.919
2.448 3.293 4.794 7.234 9.260 13.168 17.087
2 BULAN 3 BULAN 4

8 9 10 11 12 13 14

0.019 0.019 0.019 0.019 0.019 0.019 0.019

0.113

0.028 0.028

4.922
2.294
1.252

0.380 0.380
0.362 0.362
0.150 0.150

0.220
0.055
0.104

0.337
0.040
0.056

0.880
1.144 1.144

0.894
1.481 1.481
0.786 0.786

0.056
0.099
0.067
0.228

0.031 0.031
0.135 0.135

2.779
3.014
0.738

4.327
1.616
1.363

1.318
0.313
0.201

0.303 0.303
0.209 0.209
0.069 0.069

0.155
0.128
0.073

0.311
0.037
0.052

0.697
0.598
0.346

0.137
0.365
0.127
0.227
0.225
0.162

0.099
0.032
0.031

1.208 1.208
5.721 5.721

0.341
0.565 0.565

0.379
1.124 1.124
0.507 0.507

0.315
0.425
1.117
0.260
0.026
0.116

8.486 7.242 6.912 7.203 11.111 12.037 9.618


25.573 32.815 39.727 46.930 58.042 70.079 79.697

Semarang, April 2017

Estimator

Fadhel Muhammad Ruth Mega Joestantika


1312478 1312497
BULAN 4 BULAN 5

15 16 17 18 19 20

0.019 0.019 0.019 0.019 0.019 0.019

0.244
0.953
0.991

1.376 1.376
0.114
0.332
0.163
1.576

0.208 0.208
0.304

0.052
0.013

0.105
0.024
0.099
0.049
0.102
0.127

0.011
0.483 0.483

0.315
0.061

0.020
0.011
0.023
0.920
0.924

1.666 1.666
0.062
0.323
0.109

0.224 0.224
0.217

1.178
0.058

1.117
0.260

0.058
0.016
0.044
0.076
0.124
0.015
0.152

0.087
0.312 0.312

0.210
0.003
0.006

4.950 4.014 4.784 3.608 1.935 1.011


84.648 88.662 93.446 97.054 98.989 100.000

g, April 2017

Shigit Lukmana Yorick Pramulias Inkardo


1312500 1312503