10 T u k a n g b e s i Hr 95,000 105,000
11 K e p . t k . b e s i Hr 110,000 120,000
12 T u k a n g c a t Hr 95,000 105,000
13 K e p . t k . c a t Hr 110,000 120,000
14 T u k a n g p l i t u r Hr 95,000 105,000
15 T u k a n g j a l a n Hr 75,000 85,000
16 T u k a n g g a l i Hr 75,000 85,000
18 T k . l e i d e n g Hr 95,000 105,000
20 P e m b . M a s i n i s Hr 100,000 125,000
21 P e n j a g a a p i Hr 75,000 85,000
22 P e n j a g a m a l a m Hr 75,000 85,000
10 X 20 cm m2 50,000 72,000
15 X 15 cm m2 55,000 73,000
20 X 20 cm m2 55,000 74,000
20 X 25 cm m2 56,000 74,000
V.BAHAN CETAK
1 BUIS BETON Ø 10 cm - 100 cm bh 32,500 40,000
Ø 20 cm - 100 cm bh 42,000 50,000
Ø 30 cm - 100 cm bh 60,000 80,000
Ø 50 cm - 100 cm bh 115,000 160,000
Ø 60 cm - 100 cm bh 165,000 215,000
Ø 70 cm - 100 cm bh 240,000 265,000
U 10 cm - 100 cm bh 30,000 32,500
U 15 cm - 100 cm bh 35,000 40,000
U 20 cm - 100 cm bh 39,000 45,000
U 30 cm - 100 cm bh 40,000 55,000
U 50 cm - 100 cm bh 65,000 65,000
VI . B A H A N B E S I
1 BESI BETON besi beton polos kg 10,000 10,750
besi beton prestress kg 13,000 14,500
besi beton ulir kg 13,000 13,200
VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Teak wood
IX . B A H A N F I N I S H I N G
1 KAYU
2 TEMBOK
3 BESI
XIII. L A I N - L A I N
1 KREI 25 MM m2 45,000 50,000
2 Sliding Pintu J4 bh 180,000 235,000
3 Naco per Daun bh 12,000 12,500
4 Rolling door Besi m2 300,000 325,000
Rolling door Almunium m2 230,000 275,000
5 Awning Almunium m2 210,000 225,000
6 Kusen Almunium 4" Putih m' 80,000 85,000
7 WIDE FLANGE BEAM
8 ASPAL.
12 LAIN-LAIN
JUMLAH
No. SNI VOL SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM
Rp Rp
A.1 PEKERJAAN TANAH
29 T.08.b.4 1 m3 KEDALAMAN YANG > 3 m untuk setiap penambahan kedalaman 1 m 35,062.50 39,600.00
34 T.09.a.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS BATU Sedalam ≤ 1 m 116,875.00 132,000.00
35 T.09.a.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS Sedalam > 1 m sd 2 m 130,152.00 146,995.20
38 T.09.b.1 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS BATU Sedalam ≤ 1 m 129,250.00 147,090.63
39 T.09.b.2 1 m3 GALIAN TANAH CADAS ATAU TANAH KERAS Sedalam > 1 m sd 2 m 51,645.00 59,442.63
45 T.10.a.4 1 m3 GALIAN LUMPUR > 3 m untuk setiap penambahan kedalaman 1 m 14,025.00 15,840.00
49 T.10.b.4 1 m3 GALIAN LUMPUR > 3 m untuk setiap penambahan kedalaman 1 m 4,818.00 5,332.80
53 T.11.a.4 1 m3 GALIAN PASIR > 3 m untuk setiap penambahan kedalaman 1 m 9,350.00 10,560.00
57 T.11.b.4 1 m3 GALIAN PASIR > 3 m untuk setiap penambahan kedalaman 1 m 4,350.50 4,804.80
T.12.a
58 (K.3)
1 m2 PASANGAN 2 LAPIS SESEG BAMBU, JAT (JARAK ANTAR TIANG) ≤ 1,0 m' 38,087.50 42,160.25
T.12.b
59 (K.3)
1 m2 PASANGAN PAPAN 3/20, JAT ≤ 1,50 m' 61,818.90 72,631.35
T.12.c
60 (K.3)
1 m2 PASANGAN BALOK KAYU 8/12 , JAT 4 m' 185,399.50 208,102.95
T.12.d
61 1 m2 PASANGAN BALOK KAYU 8/12 , JAT ≤ 6 m' 193,539.50 217,144.95
(K.3)
T.14 TIMBUNAN DAN PEMADATAN
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti
angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang
untuk kedalaman sungai 1 m dikalikan 1,5
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal
(datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H
sampai dengan pelandaian 1V:10H yang dihitung sebagai panjang
lintasannya.
T.15.d Konversi berat material tanah biasa (lepas) kepada jenis material lain
99 T.15.d.1.a 1 m3 ANGKUT MATERIAL DENGAN JARAK ANGKUT 100 M' HORIZONTAL 48,000.00 54,300.00
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
113 P.01.e.1 1 m3 BONGKAR PASANGAN BATU & PEMBERSIHAN BATU (MANUAL) 117,744.00 133,386.00
115 P.01.e.3 1 m3 BONGKAR PASANGAN BATU DENGAN JACK HAMMER 78,100.00 88,110.00
128 P.02.f.2 1 m3 BONGKAR PASANGAN BATA MERAH dengan JACK HAMMER 27,500.00 31,020.00
176 P.12.b.1.a 1 m2 Pembabadan Rumput secara umum dan manual 1,168.75 1,320.00
P.12.b.1.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 1H s/d 2,5V :
180 1 m2 2,337.50 2,640.00
.4 1H
P.12.b.1.b Daerah datar sampai pelandaian naik dengan kemiringan 2,5V : 1H Sampai
181 1 m2 4,675.00 5,280.00
.5 Tegak
182 P.12.b.2.a 1 m2 Perhitungan Secara Umum (Jika medan tidak diketahui secara detail) 410.85 467.94
P.12.b.2.b Perhitungan secara detail (jika diketahui kondisi medan secara detail)
P.12.b.2.b
183 1 m2 Daerah datar sampai pelandaian naik dengan kemiringan 1V : 10H 386.65 440.11
.1
P.12.b.2.b Perhitungan secara detail (jika diketahui kondisi medan secara detail)
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 10H s/d 1V :
184 1 m2 421.99 480.81
.2 2,5H
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 2,5H s/d 1V :
185 1 m2 1,470.15 1,771.44
.3 1H
P.12.b.2.b Daerah datar sampai pelandaian naik dengan kemiringan 1V : 1H s/d 2,5V :
186 1 m2 914.10 1,041.37
.4 1H
193 P.14.d 1 bh Pembuatan Blok Beton Berat 0,5 Ton Quatripod, Tetrapod, Dolos Tribar 693,315.90 759,694.07
194 P.14.e 1 bh Pembuatan Blok Beton Berat 0,75 Ton Quatripod, Tetrapod, Dolos Tribar 1,037,730.68 1,137,074.44
195 P.14.f 1 bh Pembuatan Blok Beton Berat 1,00 Ton Quatripod, Tetrapod, Dolos Tribar 1,388,567.25 1,521,586.50
196 P.14.g 1 bh Pembuatan Blok Beton Berat 1,50 Ton Quatripod, Tetrapod, Dolos Tribar 2,046,314.94 2,242,302.42
197 P.14.h 1 bh Pembuatan Blok Beton Berat 2,00 Ton Quatripod, Tetrapod, Dolos Tribar 2,046,314.94 2,242,302.42
200 P.14.k 1 m3 Pemasangan Batu 1 kg - 3 kg, void maks 15% 441,809.50 503,558.00
201 P.14.l 1 m3 Pemasangan Batu 3 kg - 5 kg, void maks 15% 443,300.00 508,200.00
202 P.14.m 1 m3 Pemasangan Batu 5 kg - 10 kg, void maks 20% 501,710.00 570,845.00
203 P.14.n 1 m3 Pemasangan Batu 10 kg - 30 kg, void maks 20% 516,010.00 587,345.00
204 P.14.o 1 m3 Pemasangan Batu 30 kg - 50 kg, void maks 25% 527,560.00 600,325.00
205 P.14.p 1 m3 Pemasangan Batu 50 kg - 100 kg, void maks 25% 539,000.00 613,140.00
206 P.14.q 1 m3 Pemasangan Batu 100 kg - 200 kg, void maks 30% 550,440.00 626,340.00
208 P.14.s 1 m3 Pemasangan Batu 300 kg - 400 kg, void maks 30% 582,010.00 662,035.00
209 P.14.t 1 m3 Pemasangan Batu 400 kg - 500 kg, void maks 35% 582,010.00 662,035.00
210 P.14.u 1 m3 Pemasangan Batu 200 kg - 500 kg, void maks 32% 578,578.00 658,190.50
211 P.14.v 1 m3 Pemasangan Batu 500 kg - 650 kg, void maks 35% 599,170.00 681,642.50
212 P.14.w 1 m3 Pemasangan Batu 650 kg - 800 kg, void maks 35% 607,750.00 691,542.50
B.03 BETON MUTU , fc' = 9,8 Mpa (K.125), SLUMP (12± 2) w/c = 0,78
B.04 BETON MUTU , fc' = 12,2 Mpa (K.150), SLUMP (12± 2) w/c = 0,72
B.05 BETON MUTU , fc' = 14,5 Mpa (K.175), SLUMP (12± 2) w/c = 0,66
B.06 BETON MUTU , fc' = 16,9 Mpa (K.200), SLUMP (12± 2) w/c = 0,61
B.08 BETON MUTU , fc' = 21,7 Mpa (K.250), SLUMP (12± 2) w/c = 0,56
B.09 BETON MUTU , fc' = 16,9 Mpa (K.200), SLUMP (12± 2) w/c = 0,61
BETON MUTU , fc' = 26,4 Mpa (K.300), SLUMP (12± 2) w/c = 0,52 (KEDAP
B.10
AIR)
BETON MUTU , fc' = 31,2 Mpa (K.350), SLUMP (12± 2) w/c = 0,48 (KEDAP
B.12
AIR)
dg Ketinggian/kedalaman < 1m
Manual
241 B.17.b 100 kg Untuk Pembesian Kolom, Balok, Ring Balk dan Sloof 1,542,640.00 1,673,265.00
242 B.18 100 kg Pembesian dengan Jaring Kawat (wire mesh) Untuk Pelat atau Dinding 1,576,575.00 1,695,375.00
10 s/d
245 B.20.b m' Mekanis (penambahan jarak horizontal) 74,442.50 77,990.00
25
247 B.20.c 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 93,500.00 100,980.00
249 B.21.b 1 m2 Bekisting Lantai Beton Biasa dengan multipleks 12 mm atau 18 mm (TP) 50,353.60 60,038.00
250 B.21.c 1 m2 Bekisting Lantai Beton Biasa menggunakan papan kayu 3/20 cm (TP) 119,460.00 138,765.00
Perancah Beksiting Lantai menggunakan kaso 5/7 tinggi 4m', JAT (Jarak
251 B.21.d 1 m2 148,390.00 156,585.00
Antar Tiang) ≤ 60 cm
252 B.21.e 1 m2 Perancah Beksiting kayu dolken Ø 8 - 10 cm tinggi 4m', JAT ≤ 80 cm 86,808.70 96,053.65
B.22 FLOORDECK
254 B.22.a 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,60 m) 63,690.00 66,583.00
255 B.22.b 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,80 m) 63,129.00 65,714.00
256 B.22.c 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 1,20 m) 53,737.20 55,729.30
257 B.22.d 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 2.00 m) 49,935.60 51,665.90
260 B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 3/20 cm (TP) 174,768.00 196,922.00
Perancah Beksiting balok menggunakan Kaso 5/7 tinggi 4m' dan JAT (Jarak
261 B.23.d 1 m2 112,794.00 121,066.00
Antar Tiang) ≤ 1,00 m
266 B.24.c 1 m2 Bekisting Kolom beton biasa menggunakan kayu papan 3/20 cm, (TP) 161,832.00 183,403.00
Perancah Bekisting Kolom beton menggunakan kayu uk.5/7 cm, tinggi 4m'
267 B.24.d 1 m2 109,758.00 28,900.00
JAT ≤ 1,00 M
Perancah Bekisting Kolom beton dengan bambu Ø 8 -10 cm, tinggi 4m' JAT
269 B.24.f 1 m2 71,450.50 84,777.00
≤ 1,00 M
271 B.25.b 1 m2 Bekisting Dinding beton biasa dengan multipleks 12 mm atau 18 mm (TP) 86,851.60 98,560.00
272 B.25.c 1 m2 Bekisting Dinding beton biasa menggunakan Kayu Papan 3/20 cm 159,918.00 181,742.00
276 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa menggunakan papan 3/20 cm 170,610.00 191,785.00
281 B.28.b 100 m2 Menyirami air permukaan beton menggunakan media terpal selama 4 hari 187,000.00 224,730.00
282 B.28.c 100 m2 Menyirami permukaan beton menggunakan media karung goni selama 4 hari 506,000.00 573,100.00
286 B.30.b 1 m' Pasangan Water stop PVC lebar 200 mm 57,013.00 64,069.50
287 B.30.c 1 m' Pasangan Water stop PVC lebar 230 mm - 320 mm 104,731.00 117,744.00
288 B.30.d 1 m' Pasangan Water stop Ruber lebar 150 mm - 200 mm 149,600.00 162,442.50
290 F.02 1 m' Penetrasi Tiang Pancang Kayu atau Dolken Ø 8 - 10 cm 13,667.50 15,680.50
291 F.03 1 m' Penetrasi Tiang Pancang Baja Pipa Ø 30 cm atau Kotak 30 x 30 cm 57,172.50 62,672.50
293 F.04.b 1 m' Penetrasi Tiang Pancang Beton Kotak 25 x 25 cm 79,640.00 88,968.00
294 F.04.c 1 m' Penetrasi Tiang Pancang Beton Kotak 30 x 30 cm 136,620.00 152,064.00
295 F.04.d 1 m' Penetrasi Tiang Pancang Beton Kotak 40 x 40 cm 166,980.00 185,856.00
296 F.04.e 1 m' Penetrasi Tiang Pancang (Hollow) Beton Ø 40 cm 99,550.00 111,210.00
298 F.05.b 1 m' Penetrasi untuk 1 m' lebar turap (10 buah) Papan (2-3) x 10 cm 152,625.00 171,710.00
299 F.05.c 1 m' Penetrasi untuk 1 m' lebar turap (5 buah) Papan (2-3) x 20 cm 130,212.50 146,377.00
300 F.05.d 1 m' Penetrasi untuk 1 m' lebar turap (4 buah) Papan (2-3) x 25 cm 130,350.00 146,498.00
301 F.05.e 1 m' Penetrasi untuk 1 m' lebar turap (3,33 buah) Papan (2-3) x 30 cm 106,573.50 120,241.00
302 F.05.f 1 m' Penetrasi untuk 1 m' lebar turap (4 buah) Kayu Kaso 5/7 tebal 5 cm 126,923.50 142,851.50
303 F.05.g 1 m' Penetrasi untuk 1 m' lebar turap (20 buah) Kayu Kaso 5/7 tebal 7 cm 104,511.00 117,518.50
304 F.05.h 1 m' Penetrasi untuk 1 m' lebar turap (8 buah) Kayu Balok 8/12 tebal 8 cm 152,625.00 171,710.00
305 F.05.i 1 m' Penetrasi untuk 1 m' lebar turap (12,5 buah) Kayu Balok 8/12 tebal 12 cm 130,212.50 146,377.00
307 F.06.b 1 m' Penetrasi untuk 1 m' lebar Turap (7 buah) Baja Profil INP-8 + UNP-8 93,720.00 103,125.00
308 F.06.c 1 m' Penetrasi untuk 1 m' lebar Turap (5,56 buah) Baja Profil INP- 10 + UNP- 10 109,758.00 120,021.00
310 F.07.b 1 m' Penetrasi 1 buah Turap Beton Precast 15 x 40 cm 77,440.00 88,968.00
311 F.07.c 1 m' Penetrasi 1 buah Turap Beton Precast 22 x 50 cm 96,800.00 111,210.00
B BAHAN - -
C PERALATAN
D Jumlah A + B + C 5,100.00 5,760.00
E OVERHEAD & PROFIT (CONTOH) 10% 510.00 576.00
F Harga Satuan Pekerjaan (D+E) 5,610.00 6,336.00
B BAHAN - -
- -
C PERALATAN 3,000 3,500
0.100 hari Chainswaw 30,000 35,000 3,000 3,500
D Jumlah A + B + C 20,000.00 22,700.00
E OVERHEAD & PROFIT (CONTOH) 10% 2,000.00 2,270.00
F Harga Satuan Pekerjaan (D+E) 22,000.00 24,970.00
93,196.61 104,018.20
161,493.41 180,742.31
[Path]
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 47,855.00 54,048.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,785.50 5,404.80
F Harga Satuan Pekerjaan (D+E) 52,640.50 59,452.80
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 57,375.00 64,800.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,737.50 6,480.00
F Harga Satuan Pekerjaan (D+E) 63,112.50 71,280.00
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 64,600.00 72,960.00
E OVERHEAD & PROFIT (CONTOH) 10% 6,460.00 7,296.00
F Harga Satuan Pekerjaan (D+E) 71,060.00 80,256.00
B BAHAN - -
C PERALATAN - -
D Jumlah A + B + C 6,375.00 7,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 637.50 720.00
F Harga Satuan Pekerjaan (D+E) 7,012.50 7,920.00
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
[Path]
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- - -
C PERALATAN - -
- - -
B BAHAN - -
- -
C PERALATAN - -
- -
B BAHAN - -
- -
C PERALATAN - -
- -
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan
* bahan yang digunakan berulang kali
ke - 1 ; koefisien seseg bambu 2,200
ke - 2 ; koefisien seseg bambu 1,485
ke - 3 ; koefisien seseg bambu 1,127
59 T.12.b (K.3) 1 m2 PASANGAN PAPAN 3/20, JAT ≤ 1,50 m' 61,818.90 72,631.35
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan 43a
* bahan yang digunakan berulang kali
ke - 1 ; koefisien menjadi kayu papan 0,0321
ke - 2 ; koefisien menjadi kayu papan 0,01926
ke - 3 ; koefisien menjadi kayu papan 0,01284
ke - 4 ; koefisien menjadi kayu papan 0,00963
60 T.12.c (K.3) 1 m2 PASANGAN BALOK KAYU 8/12 , JAT 4 m' 185,399.50 208,102.95
catatan :
** coret yang tidak perlu sesuai rencana pelaksanaan di lapangan
* bahan yang digunakan berulang kali
ke - 1 ; koefisien menjadi kayu balok 0,126
ke - 2 ; koefisien menjadi kayu balok 0,0681
ke - 3 ; koefisien menjadi kayu balok 0,0391
ke - 4 ; koefisien menjadi kayu balok 0,0246
ke - 5 ; koefisien menjadi kayu balok 0,0174
T.12 PERKUATAN DINDING GALIAN
Penggunaan perkuatan dinding galian dilakukan dalam rangka sistem manajemen keselamatan dan kesehatan kerja (SMK3). Sesuai dengan Peraturan Menteri PU
No.5/PRT/M/2014 tentang SMK3.Keperluan Konstruksi perkuatan dinding disesuaikan dengan ketentuan pada spesifikasi teknis, jika tidak ditentukan perlu mempertimbangkan
hal-hal sebagai berikut :
a). perkuatan diding galian sangat tergantung pada potensi kelongsoran dinding galian tanahnya, untuk tanah cadas/keras apabila batu pada umumnya tidak diperlukan
perkuatan, Hal ini sering dilakukan pada tanah biasa, tanah berbatu atau pada galian yang mempunyai potensi longsor terutama jika kedalaman galiannya lebih dari 2 m.
Namun prakteknya galian saluran ataupun pemasangan pipa, gorong-gorong ataui box culvert untuk kedalaman galian > 1 m' saja biasa dilakukan perkuatan dinding galian.
b). Pelaksanaan perkuatan dinding galian, umumnya hanya bersifat sementara saja sehingga konstruksi perkuatan dinding galian ini setelah selesai terus dilakukan pencabutan
dan pemindahan ke ruas pekerjaan yang lainnya. Sehubungan dengan hal tersebut, beberapa jenis material sering terjadi kerusakan sehingga diperlukan penambahan material
disesuaikan dengan potensi kerusakannya.
Dengan asumsi pemakian bahan / material secara berulang, penggunaan material dihitung berdasarkan Tabel II.A.1 berikut ini :
Tabel II.A.1 Koefisien Penggunaan Berulang Bahan/Material
a) b) c) d) e) f) g) h) i) j) TIANG
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
- DIPAKAI KE 2 0.02840 m3 0.860 0.430 0.086 0.0101 m3 0.800 0.300 0.080 0.120
- DIPAKAI KE 3 0.02380 m3 0.0085 m3
4.080 kg 1.000 OH 0.500 OH 0.100 OH 0.120 2.720 kg 0.72 OH 0.38 OH 0.072 OH 0.110 0.8
2.970 kg 1.980 kg
7.200 kg 1.200 OH 0.600 OH 0.120 OH 0.100 2.720 kg 0.86 OH 0.43 OH 0.086 OH 0.090 1
5.240 kg 1.980 kg
b) DINDING PERKUATAN
a) b) c) d) e) f) g) h) i) j)
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN
KE-2 1.80 m2 0.400 0.200 0.040 1.50 m2 0.300 0.150 0.030 0.050
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN TURAP
A.3
NO. BAHAN 1 m' PALING BAWAH SETIAP PENAMBAHAN TINGGI 1 m' JARAK
a) b) c) d) e) f) g) h) i) j) TIANG
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
1 KASO 5/7 DIPAKAI KE-1 0.049612 m3 OH OH OH 0.10 0.033075 m3 OH OH OH 5
KE-2 0.033488 m3 0.840 0.280 0.084 0.022326 m3 0.570 0.190 0.057 0.070
KE-3 0.028130 m3 0.018754 m3
KE-2 0.061236 m3 1.280 OH 0.420 OH 0.126 OH 0.12 0.040824 m3 0.84 OH 0.28 OH 0.064 OH 0.06 5
20.62 kg 1.500 oh 0.500 OH 0.150 OH 0.15 13.75 kg 1.2 OH 0.4 OH 0.12 OH 0.11 5
15.00 kg 10.00 kg
4 BAJA INP-10 52.500 kg 35.000 kg
28.860 kg 2.100 OH 0.700 OH 0.210 OH 0.160 19.220 kg 1.5 OH 0.5 OH 0.15 OH 0.120 5
21.000 kg 14.000 kg
28.750 kg 19.160 kg
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang untuk kedalaman
sungai 1 m dikalikan 1,5
T.15.a. ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN UNTUK JARAK HARIZONTAL (DATAR)
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal (datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H sampai dengan pelandaian
1V:10H yang dihitung sebagai panjang lintasannya.
MENGANGKUT MATERIAL ATAU DAN HASIL GALIAN DG
66 T.15.a.1 1 m3 21,824.00 24,688.40
JARAK ANGKUT 5 m
A TENAGA 19,840.00 22,444.00
L.01 0.2480 OH Pekerja 75,000 85,000 18,600.00 21,080.00
L.04 0.0124 OH Mandor 100,000 110,000 1,240.00 1,364.00
B BAHAN - -
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
C PERALATAN - -
D Jumlah A + B + C 33,760.00 38,191.00
E OVERHEAD & PROFIT (CONTOH) 10% 3,376.00 3,819.10
F Harga Satuan Pekerjaan (D+E) 37,136.00 42,010.10
C PERALATAN - -
10 Pipa Beton (tidak bertulang) Fc’ = 12,5 Mpa 2,25 - 2,50 2.40 0.9
11 Pipa Beton (bertulang 155 kg besi / m3) 2,35 - 2,55 2.50 0.9
Keterangan :
* Berat isi lepas ** Hasil pemecah batu mulai dari 1,20 ton/m3
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
ANGKUT MATERIAL DENGAN JARAK ANGKUT 100 M'
99 T.15.d.1.a 1 m3 48,000.00 54,300.00
HORIZONTAL
A TENAGA 48,000.00 54,300.00
L.01 0.6000 OH Pekerja 75,000 85,000 45,000.00 51,000.00
L.04 0.0300 OH Mandor 100,000 110,000 3,000.00 3,300.00
B BAHAN - -
- -
C PERALATAN - -
- -
D Jumlah A + B + C 48,000.00 54,300.00
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 50 kg angkut jarak horizontal = 1,00 x 0,05/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
Contoh perhitungan konversi jenis material dan jarak angkut naik atau turun
102 T.15.d.2.a 1 m3 JARAK ANGKUT HORIZONTAL 100 M 52,800.00 59,730.00
JARAK ANGKUT MATERIAL DENGAN JARAK ANGKUT 100
T.15.d.6
M'
A TENAGA 48,000.00 54,300.00
L.01 0.6000 OH Pekerja 75,000 85,000 45,000.00 51,000.00
L.04 0.0300 OH Mandor 100,000 110,000 3,000.00 3,300.00
B BAHAN - -
- -
C PERALATAN - -
- -
D Jumlah A + B + C 48,000.00 54,300.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,800.00 5,430.00
F Harga Satuan Pekerjaan (D+E) 52,800.00 59,730.00
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 50 kg angkut jarak horizontal = 1,00 x 0,05/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 1m3 agregat kasar atau koral = 1,00 x 1,26/1,10 x HSP angkut 1 m3 tanah lepas
HSP angkut 100 kg besi beton = 0,70 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg GIP = 0,80 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
HSP angkut 100 kg PIPA PVC = 0,90 x 0,1/1,10 X hps angkut 1 m3 tanah lepas
115 P.01.e.3 1 m3 BONGKAR PASANGAN BATU DENGAN JACK HAMMER 78,100.00 88,110.00
A TENAGA 51,000.00 57,600.00
L.01 0.60 OH Pekerja 75,000 85,000 45,000.00 51,000.00
L.04 0.06 OH Mandor 100,000 110,000 6,000.00 6,600.00
B BAHAN - -
C PERALATAN 20,000.00 22,500.00
0.050 hr Jack Hammer 400,000 450,000 20,000.00 22,500.00
D Jumlah A + B + C 71,000.00 80,100.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,100.00 8,010.00
F Harga Satuan Pekerjaan (D+E) 78,100.00 88,110.00
140 P.06.a.1.b 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga 1,389,267.00 1,562,610.50
lilitan Uk.3,0 mm, kwat sisi 4,0 mm dan kawat
pengikat 2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 274,000.00 305,230.00
L.01 1.680 OH Pekerja 75,000 85,000 126,000.00 142,800.00
L.02 0.560 OH Tukang Batu 95,000 105,000 53,200.00 58,800.00
L.03 0.650 OH Kepala Tukang 110,000 120,000 71,500.00 78,000.00
L.04 0.233 OH Mandor 100,000 110,000 23,300.00 25,630.00
B BAHAN 988,970.00 1,115,325.00
2.60 m3 Batu 260,000 300,000 676,000.00 780,000.00
22.355 kg Kawat Bronjong Ø 3 mm 14,000 15,000 312,970.00 335,325.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,262,970.00 1,420,555.00
E OVERHEAD & PROFIT (CONTOH) 10% 126,297.00 142,055.50
F Harga Satuan Pekerjaan (D+E) 1,389,267.00 1,562,610.50
141 P.06.a.1.c 2 m3 Kawat Bronjong wire mesh 5 mm ulir dan kawat 1,824,020.00 2,037,365.00
pengikat 2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 448,100.00 499,900.00
L.01 2.865 OH Pekerja 75,000 85,000 214,875.00 243,525.00
L.02 0.955 OH Tukang Batu 95,000 105,000 90,725.00 100,275.00
L.03 0.650 OH Kepala Tukang 110,000 120,000 71,500.00 78,000.00
L.04 0.710 OH Mandor 100,000 110,000 71,000.00 78,100.00
B BAHAN 1,210,100.00 1,352,250.00
2.60 m3 Batu 260,000 300,000 676,000.00 780,000.00
38.15 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 534,100.00 572,250.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,658,200.00 1,852,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 165,820.00 185,215.00
F Harga Satuan Pekerjaan (D+E) 1,824,020.00 2,037,365.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
143 P.06.a.2.b 3 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,053,363.40 2,310,605.00
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 400,550.00 446,110.00
L.01 2.430 OH Pekerja 75,000 85,000 182,250.00 206,550.00
L.02 0.810 OH Tukang Batu 95,000 105,000 76,950.00 85,050.00
L.03 0.975 OH Kepala Tukang 110,000 120,000 107,250.00 117,000.00
L.04 0.341 OH Mandor 100,000 110,000 34,100.00 37,510.00
B BAHAN 1,466,144.00 1,654,440.00
3.90 m3 Batu 260,000 300,000 1,014,000.00 1,170,000.00
32.296 kg Kawat Bronjong Ø 3 mm 14,000 15,000 452,144.00 484,440.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,866,694.00 2,100,550.00
E OVERHEAD & PROFIT (CONTOH) 10% 186,669.40 210,055.00
F Harga Satuan Pekerjaan (D+E) 2,053,363.40 2,310,605.00
144 P.06.a.2.c 3 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 2,622,015.00 2,931,060.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 598,250.00 668,100.00
L.01 4.125 OH Pekerja 75,000 85,000 309,375.00 350,625.00
L.02 1.375 OH Tukang Batu 95,000 105,000 130,625.00 144,375.00
L.03 0.975 OH Kepala Tukang 110,000 120,000 107,250.00 117,000.00
L.04 0.510 OH Mandor 100,000 110,000 51,000.00 56,100.00
B BAHAN 1,785,400.00 1,996,500.00
3.90 m3 Batu 260,000 300,000 1,014,000.00 1,170,000.00
55.10 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 771,400.00 826,500.00
C PERALATAN - -
D Jumlah A + B + C 2,383,650.00 2,664,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 238,365.00 266,460.00
F Harga Satuan Pekerjaan (D+E) 2,622,015.00 2,931,060.00
146 P.06.a.3.b 4 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,704,149.80 3,044,068.50
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 515,000.00 573,780.00
L.01 3.180 OH Pekerja 75,000 85,000 238,500.00 270,300.00
L.02 1.060 OH Tukang Batu 95,000 105,000 100,700.00 111,300.00
L.03 1.200 OH Kepala Tukang 110,000 120,000 132,000.00 144,000.00
L.04 0.438 OH Mandor 100,000 110,000 43,800.00 48,180.00
B BAHAN 1,943,318.00 2,193,555.00
5.20 m3 Batu 260,000 300,000 1,352,000.00 1,560,000.00
42.237 kg Kawat Bronjong Ø 3 mm 14,000 15,000 591,318.00 633,555.00
C PERALATAN - -
D Jumlah A + B + C 2,458,318.00 2,767,335.00
E OVERHEAD & PROFIT (CONTOH) 10% 245,831.80 276,733.50
F Harga Satuan Pekerjaan (D+E) 2,704,149.80 3,044,068.50
147 P.06.a.3.c 4 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat 3,462,140.00 3,871,120.00
pengikat 2,0mm uk. lobang heksagonal 100x100 mm
A TENAGA 786,000.00 877,700.00
L.01 5.400 OH Pekerja 75,000 85,000 405,000.00 459,000.00
L.02 1.800 OH Tukang Batu 95,000 105,000 171,000.00 189,000.00
L.03 1.300 OH Kepala Tukang 110,000 120,000 143,000.00 156,000.00
L.04 0.670 OH Mandor 100,000 110,000 67,000.00 73,700.00
B BAHAN 2,361,400.00 2,641,500.00
5.20 m3 Batu 260,000 300,000 1,352,000.00 1,560,000.00
72.10 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 1,009,400.00 1,081,500.00
C PERALATAN - -
- -
D Jumlah A + B + C 3,147,400.00 3,519,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 314,740.00 351,920.00
F Harga Satuan Pekerjaan (D+E) 3,462,140.00 3,871,120.00
149 P.06.a.4.b 1 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 821,330.40 919,715.50
Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 190,950.00 212,840.00
L.01 1.170 OH Pekerja 75,000 85,000 87,750.00 99,450.00
L.02 0.390 OH Tukang Batu 95,000 105,000 37,050.00 40,950.00
L.03 0.325 OH Kepala Tukang 110,000 120,000 35,750.00 39,000.00
L.04 0.304 OH Mandor 100,000 110,000 30,400.00 33,440.00
B BAHAN 555,714.00 623,265.00
1.30 m3 Batu 260,000 300,000 338,000.00 390,000.00
15.551 kg Kawat Bronjong Ø 3 mm 14,000 15,000 217,714.00 233,265.00
C PERALATAN - -
- -
D Jumlah A + B + C 746,664.00 836,105.00
E OVERHEAD & PROFIT (CONTOH) 10% 74,666.40 83,610.50
F Harga Satuan Pekerjaan (D+E) 821,330.40 919,715.50
150 P.06.a.4.c 1 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 1,077,417.00 1,198,956.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 270,050.00 302,010.00
L.01 1.980 OH Pekerja 75,000 85,000 148,500.00 168,300.00
L.02 0.660 OH Tukang Batu 95,000 105,000 62,700.00 69,300.00
L.03 0.325 OH Kepala Tukang 110,000 120,000 35,750.00 39,000.00
L.04 0.231 OH Mandor 100,000 110,000 23,100.00 25,410.00
B BAHAN 709,420.00 787,950.00
1.30 m3 Batu 260,000 300,000 338,000.00 390,000.00
26.53 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 371,420.00 397,950.00
C PERALATAN - -
D Jumlah A + B + C 979,470.00 1,089,960.00
E OVERHEAD & PROFIT (CONTOH) 10% 97,947.00 108,996.00
F Harga Satuan Pekerjaan (D+E) 1,077,417.00 1,198,956.00
152 P.06.a.5.b 1.5 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,479,627.60 1,656,446.00
Uk.3,0 mm, kwat sisi 4,0 mm dan kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 521,100.00 581,200.00
L.01 3.390 OH Pekerja 75,000 85,000 254,250.00 288,150.00
L.02 1.130 OH Tukang Batu 95,000 105,000 107,350.00 118,650.00
L.03 1.050 OH Kepala Tukang 110,000 120,000 115,500.00 126,000.00
L.04 0.440 OH Mandor 100,000 110,000 44,000.00 48,400.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
153 P.06.a.5.c 1.5 m3 Kawat Bronjong wire mesh 5 mm ulir & kawat pengikat 1,964,798.00 2,188,560.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 738,500.00 825,300.00
L.01 5.250 OH Pekerja 75,000 85,000 393,750.00 446,250.00
L.02 1.750 OH Tukang Batu 95,000 105,000 166,250.00 183,750.00
L.03 1.050 OH Kepala Tukang 110,000 120,000 115,500.00 126,000.00
L.04 0.630 OH Mandor 100,000 110,000 63,000.00 69,300.00
B BAHAN 1,047,680.00 1,164,300.00
1.95 m3 Batu 260,000 300,000 507,000.00 585,000.00
38.620 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 540,680.00 579,300.00
C PERALATAN - -
D Jumlah A + B + C 1,786,180.00 1,989,600.00
E OVERHEAD & PROFIT (CONTOH) 10% 178,618.00 198,960.00
F Harga Satuan Pekerjaan (D+E) 1,964,798.00 2,188,560.00
155 P.06.a.6.b 2 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 1,573,983.40 1,764,185.50
Uk.3,0 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 100 x 120 mm
A TENAGA 338,800.00 377,990.00
L.01 2.235 OH Pekerja 75,000 85,000 167,625.00 189,975.00
L.02 0.745 OH Tukang Batu 95,000 105,000 70,775.00 78,225.00
L.03 0.650 OH Kepala Tukang 110,000 120,000 71,500.00 78,000.00
L.04 0.289 OH Mandor 100,000 110,000 28,900.00 31,790.00
B BAHAN 1,092,094.00 1,225,815.00
2.60 m3 Batu 260,000 300,000 676,000.00 780,000.00
29.721 kg Kawat Bronjong Ø 3 mm 14,000 15,000 416,094.00 445,815.00
C PERALATAN - -
D Jumlah A + B + C 1,430,894.00 1,603,805.00
E OVERHEAD & PROFIT (CONTOH) 10% 143,089.40 160,380.50
F Harga Satuan Pekerjaan (D+E) 1,573,983.40 1,764,185.50
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
156 P.06.a.6.c 2 m3 Kawat Bronjong wire mesh 5 mm ulir&kawat pengikat 2,047,958.00 2,279,750.00
2,0mm, ukuran lobang heksagonal 100 x 100 mm
A TENAGA 475,700.00 531,700.00
L.01 3.405 OH Pekerja 75,000 85,000 255,375.00 289,425.00
L.02 1.135 OH Tukang Batu 95,000 105,000 107,825.00 119,175.00
L.03 0.650 OH Kepala Tukang 110,000 120,000 71,500.00 78,000.00
L.04 0.410 OH Mandor 100,000 110,000 41,000.00 45,100.00
B BAHAN 1,386,080.00 1,540,800.00
2.60 m3 Batu 260,000 300,000 676,000.00 780,000.00
50.72 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 710,080.00 760,800.00
C PERALATAN - -
- -
D Jumlah A + B + C 1,861,780.00 2,072,500.00
E OVERHEAD & PROFIT (CONTOH) 10% 186,178.00 207,250.00
F Harga Satuan Pekerjaan (D+E) 2,047,958.00 2,279,750.00
159 P.06.b.1.b 2.04 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,030,769.40 2,260,896.00
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 447,030.00 499,470.00
L.01 3.150 OH Pekerja 75,000 85,000 236,250.00 267,750.00
L.02 1.050 OH Tukang Batu 95,000 105,000 99,750.00 110,250.00
L.03 0.663 OH Kepala Tukang 110,000 120,000 72,930.00 79,560.00
L.04 0.381 OH Mandor 100,000 110,000 38,100.00 41,910.00
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
161 P.06.b.2.b 2.76 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 2,427,871.60 2,712,022.50
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 527,670.00 589,140.00
L.01 3.600 OH Pekerja 75,000 85,000 270,000.00 306,000.00
L.02 1.200 OH Tukang Batu 95,000 105,000 114,000.00 126,000.00
L.03 0.897 OH Kepala Tukang 110,000 120,000 98,670.00 107,640.00
L.04 0.450 OH Mandor 100,000 110,000 45,000.00 49,500.00
B BAHAN 1,679,486.00 1,876,335.00
3.588 m3 Batu 260,000 300,000 932,880.00 1,076,400.00
53.329 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 746,606.00 799,935.00
C PERALATAN - -
D Jumlah A + B + C 2,207,156.00 2,465,475.00
E OVERHEAD & PROFIT (CONTOH) 10% 220,715.60 246,547.50
F Harga Satuan Pekerjaan (D+E) 2,427,871.60 2,712,022.50
C PERALATAN - -
D Jumlah A + B + C 2,435,480.00 2,738,130.00
E OVERHEAD & PROFIT (CONTOH) 10% 243,548.00 273,813.00
F Harga Satuan Pekerjaan (D+E) 2,679,028.00 3,011,943.00
163 P.06.b.3.b 3.6 m3 Kawat Bronjong galvanis dg kawat anyaman tiga lilitan 3,169,856.80 3,551,295.00
Uk.2,7 mm, kwat sisi 4,0 mm & kawat pengikat
2,0mm, ukuran lobang heksagonal 80 x 100 mm
A TENAGA 875,400.00 978,570.00
L.01 6.300 OH Pekerja 75,000 85,000 472,500.00 535,500.00
L.02 2.100 OH Tukang Batu 95,000 105,000 199,500.00 220,500.00
L.03 1.170 OH Kepala Tukang 110,000 120,000 128,700.00 140,400.00
L.04 0.747 OH Mandor 100,000 110,000 74,700.00 82,170.00
B BAHAN 2,006,288.00 2,249,880.00
4.68 m3 Batu 260,000 300,000 1,216,800.00 1,404,000.00
56.392 kg Kawat Bronjong Ø 2,7 mm 14,000 15,000 789,488.00 845,880.00
C PERALATAN - -
D Jumlah A + B + C 2,881,688.00 3,228,450.00
E OVERHEAD & PROFIT (CONTOH) 10% 288,168.80 322,845.00
F Harga Satuan Pekerjaan (D+E) 3,169,856.80 3,551,295.00
Untuk pemancangan kayu atau dolken Ø 8 - 10 cm menggunakan AHSP F.02 per-m' penetrasi tiang pancang kayu dolken Ø 8 - 10 cm, Terkait
dengan asesoris sepatu adan atau sambungan kayu atau dolken Ø 8 - 10 cm harus disesuaikan, misalnya menggunakan sepatu atau tidak dan
berapa jumlah sambungan yang digunakan?, Berapa panjang kayu atau dolken yang digunakan dapat pula berbeda dengan panjang penetrasi
yang dipancangnya. Sebaiknya dibuat masing-masing secara terpisah yaitu :
a. Panjang kayu atau dolken yang digunakan sesuai dengan harga materialnya;
b. jika menggunakan sepatu pancang sesuai harga materialnya; dan
c. biaya per-m' pemancangan sesuai dengan harga penjualannya pada AHSP F.02 per - m' penetrasi tiang pancang kayu dolken Ø 8 - 10 cm
- -
D Jumlah A + B + C 44,900.00 49,120.00
PASANGAN BAR SCREEN (SARINGAN KASAR), BANGUNAN INTAKE, PENGUKUR, DAN PENGATUR
Saringan kasar terbuat dari besi beton sesuai kebutuhan, misal menggunakan besi beton Ø 12 mm berjarak as satu sama lain 3,5
cm dihitung untuk 1 m2 saringan kasar AHSPnya sebagai berikut :
176 P.12.b.1.a 1 m2 Pembabadan Rumput secara umum dan manual 1,168.75 1,320.00
A TENAGA 1,062.50 1,200.00
L.01 0.01250 OH Pekerja 75,000 85,000 937.50 1,062.50
L.04 0.00125 OH Mandor 100,000 110,000 125.00 137.50
B BAHAN - -
- - -
C PERALATAN - -
- hr Alat Potong Rumput 7,500 8,000 - -
D Jumlah A + B + C 1,062.50 1,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 106.25 120.00
F Harga Satuan Pekerjaan (D+E) 1,168.75 1,320.00
Berbagai jenis armor yang terbuat dari beton diantaranya : berbentuk kubus, 3B, Quadripod, tetrapod, dolos dan
lain-lain. Untuk pembuatan dan pemasangan berbagai jenis armor sebagai berikut :
201 P.14.l 1 m3 Pemasangan Batu 3 kg - 5 kg, void maks 15% 443,300.00 508,200.00
A TENAGA 94,000.00 106,000.00
L.01 1.000 OH Pekerja 75,000 85,000 75,000.00 85,000.00
L.02 0.200 OH Tukang Batu 95,000 105,000 19,000.00 21,000.00
L.04 0.100 OH Mandor 100,000 110,000 10,000.00 11,000.00
B BAHAN 299,000.00 345,000.00
1.150 m3 Batu 260,000 300,000 299,000.00 345,000.00
C PERALATAN 430,000.00 490,000.00
0.1000 jam Whell Loader / Excavator 270,000 280,000 27,000.00 28,000.00
D Jumlah A + B + C 403,000.00 462,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 40,300.00 46,200.00
F Harga Satuan Pekerjaan (D+E) 443,300.00 508,200.00
202 P.14.m 1 m3 Pemasangan Batu 5 kg - 10 kg, void maks 20% 501,710.00 570,845.00
A TENAGA 114,400.00 128,150.00
L.01 1.100 OH Pekerja 75,000 85,000 82,500.00 93,500.00
L.02 0.220 OH Tukang Batu 95,000 105,000 20,900.00 23,100.00
L.04 0.110 OH Mandor 100,000 105,000 11,000.00 11,550.00
B BAHAN 312,000.00 360,000.00
1.200 m3 Batu 260,000 300,000 312,000.00 360,000.00
C PERALATAN 29,700.00 30,800.00
0.110 jam Whell Loader / Excavator 270,000 280,000 29,700.00 30,800.00
D Jumlah A + B + C 456,100.00 518,950.00
E OVERHEAD & PROFIT (CONTOH) 10% 45,610.00 51,895.00
F Harga Satuan Pekerjaan (D+E) 501,710.00 570,845.00
203 P.14.n 1 m3 Pemasangan Batu 10 kg - 30 kg, void maks 20% 516,010.00 587,345.00
A TENAGA 114,400.00 128,150.00
L.01 1.100 OH Pekerja 75,000 85,000 82,500.00 93,500.00
L.02 0.220 OH Tukang Batu 95,000 105,000 20,900.00 23,100.00
L.04 0.110 OH Mandor 100,000 105,000 11,000.00 11,550.00
B BAHAN 325,000.00 375,000.00
1.250 m3 Batu 260,000 300,000 325,000.00 375,000.00
C PERALATAN 29,700.00 30,800.00
0.110 jam Whell Loader / Excavator 270,000 280,000 29,700.00 30,800.00
D Jumlah A + B + C 469,100.00 533,950.00
E OVERHEAD & PROFIT (CONTOH) 10% 46,910.00 53,395.00
F Harga Satuan Pekerjaan (D+E) 516,010.00 587,345.00
204 P.14.o 1 m3 Pemasangan Batu 30 kg - 50 kg, void maks 25% 527,560.00 600,325.00
A TENAGA 114,400.00 128,150.00
L.01 1.100 OH Pekerja 75,000 85,000 82,500.00 93,500.00
L.02 0.220 OH Tukang Batu 95,000 105,000 20,900.00 23,100.00
L.04 0.110 OH Mandor 100,000 105,000 11,000.00 11,550.00
B BAHAN 332,800.00 384,000.00
1.280 m3 Batu 260,000 300,000 332,800.00 384,000.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 479,600.00 545,750.00
E OVERHEAD & PROFIT (CONTOH) 10% 47,960.00 54,575.00
F Harga Satuan Pekerjaan (D+E) 527,560.00 600,325.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
205 P.14.p 1 m3 Pemasangan Batu 50 kg - 100 kg, void maks 25% 539,000.00 613,140.00
A TENAGA 124,800.00 139,800.00
L.01 1.200 OH Pekerja 75,000 85,000 90,000.00 102,000.00
L.02 0.240 OH Tukang Batu 95,000 105,000 22,800.00 25,200.00
L.04 0.120 OH Mandor 100,000 105,000 12,000.00 12,600.00
B BAHAN 332,800.00 384,000.00
1.280 m3 Batu 260,000 300,000 332,800.00 384,000.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 490,000.00 557,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 49,000.00 55,740.00
F Harga Satuan Pekerjaan (D+E) 539,000.00 613,140.00
206 P.14.q 1 m3 Pemasangan Batu 100 kg - 200 kg, void maks 30% 550,440.00 626,340.00
A TENAGA 124,800.00 139,800.00
L.01 1.200 OH Pekerja 75,000 85,000 90,000.00 102,000.00
L.02 0.240 OH Tukang Batu 95,000 105,000 22,800.00 25,200.00
L.04 0.120 OH Mandor 100,000 105,000 12,000.00 12,600.00
B BAHAN 343,200.00 396,000.00
1.320 m3 Batu 260,000 300,000 343,200.00 396,000.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 500,400.00 569,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 50,040.00 56,940.00
F Harga Satuan Pekerjaan (D+E) 550,440.00 626,340.00
207 P.14.r 1 m3 Pemasangan Batu 200 kg - 300 kg, void maks 30% 550,440.00 626,340.00
A TENAGA 124,800.00 139,800.00
L.01 1.200 OH Pekerja 75,000 85,000 90,000.00 102,000.00
L.02 0.240 OH Tukang Batu 95,000 105,000 22,800.00 25,200.00
L.04 0.120 OH Mandor 100,000 105,000 12,000.00 12,600.00
B BAHAN 343,200.00 396,000.00
1.320 m3 Batu 260,000 300,000 343,200.00 396,000.00
C PERALATAN 32,400.00 33,600.00
0.120 jam Whell Loader / Excavator 270,000 280,000 32,400.00 33,600.00
D Jumlah A + B + C 500,400.00 569,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 50,040.00 56,940.00
F Harga Satuan Pekerjaan (D+E) 550,440.00 626,340.00
208 P.14.s 1 m3 Pemasangan Batu 300 kg - 400 kg, void maks 30% 582,010.00 662,035.00
A TENAGA 135,200.00 151,450.00
L.01 1.300 OH Pekerja 75,000 85,000 97,500.00 110,500.00
L.02 0.260 OH Tukang Batu 95,000 105,000 24,700.00 27,300.00
L.04 0.130 OH Mandor 100,000 105,000 13,000.00 13,650.00
B BAHAN 358,800.00 414,000.00
1.380 m3 Batu 260,000 300,000 358,800.00 414,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 529,100.00 601,850.00
E OVERHEAD & PROFIT (CONTOH) 10% 52,910.00 60,185.00
F Harga Satuan Pekerjaan (D+E) 582,010.00 662,035.00
209 P.14.t 1 m3 Pemasangan Batu 400 kg - 500 kg, void maks 35% 582,010.00 662,035.00
A TENAGA 135,200.00 151,450.00
L.01 1.300 OH Pekerja 75,000 85,000 97,500.00 110,500.00
L.02 0.260 OH Tukang Batu 95,000 105,000 24,700.00 27,300.00
L.04 0.130 OH Mandor 100,000 105,000 13,000.00 13,650.00
B BAHAN 358,800.00 414,000.00
1.380 m3 Batu 260,000 300,000 358,800.00 414,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 529,100.00 601,850.00
E OVERHEAD & PROFIT (CONTOH) 10% 52,910.00 60,185.00
F Harga Satuan Pekerjaan (D+E) 582,010.00 662,035.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
210 P.14.u 1 m3 Pemasangan Batu 200 kg - 500 kg, void maks 32% 578,578.00 658,190.50
A TENAGA 132,080.00 147,955.00
L.01 1.270 OH Pekerja 75,000 85,000 95,250.00 107,950.00
L.02 0.254 OH Tukang Batu 95,000 105,000 24,130.00 26,670.00
L.04 0.127 OH Mandor 100,000 105,000 12,700.00 13,335.00
B BAHAN 358,800.00 414,000.00
1.380 m3 Batu 260,000 300,000 358,800.00 414,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 525,980.00 598,355.00
E OVERHEAD & PROFIT (CONTOH) 10% 52,598.00 59,835.50
F Harga Satuan Pekerjaan (D+E) 578,578.00 658,190.50
211 P.14.v 1 m3 Pemasangan Batu 500 kg - 650 kg, void maks 35% 599,170.00 681,642.50
A TENAGA 140,400.00 157,275.00
L.01 1.350 OH Pekerja 75,000 85,000 101,250.00 114,750.00
L.02 0.270 OH Tukang Batu 95,000 105,000 25,650.00 28,350.00
L.04 0.135 OH Mandor 100,000 105,000 13,500.00 14,175.00
B BAHAN 369,200.00 426,000.00
1.420 m3 Batu 260,000 300,000 369,200.00 426,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 544,700.00 619,675.00
E OVERHEAD & PROFIT (CONTOH) 10% 54,470.00 61,967.50
F Harga Satuan Pekerjaan (D+E) 599,170.00 681,642.50
212 P.14.w 1 m3 Pemasangan Batu 650 kg - 800 kg, void maks 35% 607,750.00 691,542.50
A TENAGA 140,400.00 157,275.00
L.01 1.350 OH Pekerja 75,000 85,000 101,250.00 114,750.00
L.02 0.270 OH Tukang Batu 95,000 105,000 25,650.00 28,350.00
L.04 0.135 OH Mandor 100,000 105,000 13,500.00 14,175.00
B BAHAN 377,000.00 435,000.00
1.450 m3 Batu 260,000 300,000 377,000.00 435,000.00
C PERALATAN 35,100.00 36,400.00
0.130 jam Whell Loader / Excavator 270,000 280,000 35,100.00 36,400.00
D Jumlah A + B + C 552,500.00 628,675.00
E OVERHEAD & PROFIT (CONTOH) 10% 55,250.00 62,867.50
F Harga Satuan Pekerjaan (D+E) 607,750.00 691,542.50
C PERALATAN - -
- -
D Jumlah A + B + C 807,940.00 915,750.00
E OVERHEAD & PROFIT (CONTOH) 10% 80,794.00 91,575.00
F Harga Satuan Pekerjaan (D+E) 888,734.00 1,007,325.00
- - - -
C PERALATAN - -
- -
C PERALATAN - -
hr Molen 0,35 m3 250,000 275,000 - -
D Jumlah A + B + C 834,997.50 937,091.25
C PERALATAN - -
- -
D Jumlah A + B + C 890,992.50 997,721.25
E OVERHEAD & PROFIT (CONTOH) 10% 89,099.25 99,772.13
F Harga Satuan Pekerjaan (D+E) 980,091.75 1,097,493.38
C PERALATAN - -
- -
D Jumlah A + B + C 918,577.69 1,026,633.41
C PERALATAN - -
- -
D Jumlah A + B + C 1,036,306.85 1,146,027.16
- -
D Jumlah A + B + C 1,059,037.41 1,168,445.62
E OVERHEAD & PROFIT (CONTOH) 10% 105,903.74 116,844.56
232 B.13.b
A TENAGA - -
L.01 - OH Pekerja 75,000 85,000 - -
L.02 - OH Tukang Batu 95,000 105,000 - -
- -
C PERALATAN - -
- -
235 1 m3 Beton Dicorkan pada tapak berjarak setiap tambahan 25 m 78,100.00 87,120.00
B BAHAN - -
- -
- -
C PERALATAN 15,000.00 16,000.00
0.1 hr Vibrator 150,000 160,000 15,000.00 16,000.00
B BAHAN - -
- -
C PERALATAN - -
- -
D Jumlah A + B + C 42,500.00 48,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 4,250.00 4,800.00
F Harga Satuan Pekerjaan (D+E) 46,750.00 52,800.00
238 B.16 1 m3 Beton Dicorkan pada tapak Tiap Kenaikan 4 m (vertikal) 23,375.00 26,400.00
- -
D Jumlah A + B + C 21,250.00 24,000.00
- -
C PERALATAN 54,000.00 60,000.00
0.12 hr Pompa & Conveyor Beton 450,000 500,000 54,000.00 60,000.00
- -
241 B.17.b 100 kg Untuk Pembesian Kolom, Balok, Ring Balk dan Sloof 1,542,640.00 1,673,265.00
- -
D Jumlah A + B + C 1,433,250.00 1,541,250.00
E OVERHEAD & PROFIT (CONTOH) 10% 143,325.00 154,125.00
244 B.20
MENGANGKUT / MENAIKKAN TULANGAN SETIAP
KENAIKAN VERTIKAL 4 M' ATAU JARAK HORIZONTAL 25
M KE TAPAK PEMASANGAN
B BAHAN
C PERALATAN - -
245 B.20.b 10 s/d 25 m' Mekanis (penambahan jarak horizontal) 74,442.50 77,990.00
A TENAGA 20,800.00 23,400.00
L.01 0.200 OH Pekerja 75,000 85,000 15,000.00 17,000.00
L.02 0.040 OH Tukang Besi 95,000 105,000 3,800.00 4,200.00
L.04 0.020 OH Mandor 100,000 110,000 2,000.00 2,200.00
B BAHAN
B BAHAN
247 B.20.c 4 m' Mekanis (penambahan tiap 4 m' jarak vertikal) 93,500.00 100,980.00
A TENAGA 35,000.00 39,300.00
L.01 0.300 OH Pekerja 75,000 85,000 22,500.00 25,500.00
249 B.21.b 1 m2 Bekisting Lantai Beton Biasa dengan multipleks 12 mm 50,353.60 60,038.00
atau 18 mm (TP)
250 B.21.c 1 m2 Bekisting Lantai Beton Biasa menggunakan papan kayu 119,460.00 138,765.00
3/20 cm (TP)
C PERALATAN - -
- -
D Jumlah A + B + C 108,600.00 126,150.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,860.00 12,615.00
C PERALATAN - -
- -
D Jumlah A + B + C 134,900.00 142,350.00
E OVERHEAD & PROFIT (CONTOH) 10% 13,490.00 14,235.00
C PERALATAN - -
- -
3.500 m' Tambang ijuk atau plastik 250 300 875.00 1,050.00
- -
D Jumlah A + B + C 70,835.00 87,690.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,083.50 8,769.00
B.22 FLOORDECK
254 B.22.a 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,60 m) 63,690.00 66,583.00
A TENAGA 13,800.00 15,450.00
C PERALATAN - -
- -
D Jumlah A + B + C 57,900.00 60,530.00
255 B.22.b 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 0,80 m) 63,129.00 65,714.00
C PERALATAN - -
- -
D Jumlah A + B + C 57,390.00 59,740.00
E OVERHEAD & PROFIT (CONTOH) 10% 5,739.00 5,974.00
256 B.22.c 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 1,20 m) 53,737.20 55,729.30
A TENAGA 7,452.00 8,343.00
257 B.22.d 1 m2 Bekisting Lantai Floordeck tipe Pelat (JAP ≤ 2.00 m) 49,935.60 51,665.90
A TENAGA 5,796.00 6,489.00
L.01 0.0420 OH Pekerja 75,000 85,000 3,150.00 3,570.00
C PERALATAN - -
- -
259 B.23.b 1 m2 Bekisting balok beton biasa menggunakan multipleks 12 116,705.60 129,096.00
mm JAT (Jarak Antar Tiang) ≤ 1,00 m
C PERALATAN - -
- -
D Jumlah A + B + C 106,096.00 117,360.00
260 B.23.c 1 m2 Bekisting balok beton biasa menggunakan kayu papan 174,768.00 196,922.00
3/20 cm (TP)
0.8130 btg Dolken Ø 8-10 cm panjang 4' m 21,000 24,000 17,073.00 19,512.00
0.2800 kg Paku 14,000 16,000 3,920.00 4,480.00
C PERALATAN - -
3.500 m' Tambang ijuk atau plastik 250 300 875.00 1,050.00
C PERALATAN - -
- -
D Jumlah A + B + C 79,825.00 93,820.00
C PERALATAN - -
- -
D Jumlah A + B + C 136,595.00 147,145.00
C PERALATAN - -
- -
D Jumlah A + B + C 80,836.00 91,270.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,083.60 9,127.00
C PERALATAN - -
- -
D Jumlah A + B + C 99,780.00 106,970.00
- -
D Jumlah A + B + C 71,508.00 80,502.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,150.80 8,050.20
270 B.25.a 1 m2 Bekisting Dinding beton expose dengan multipleks 18 mm 146,454.00 158,224.00
C PERALATAN - -
- -
D Jumlah A + B + C 133,140.00 143,840.00
E OVERHEAD & PROFIT (CONTOH) 10% 13,314.00 14,384.00
271 B.25.b 1 m2 Bekisting Dinding beton biasa dengan multipleks 12 mm 86,851.60 98,560.00
atau 18 mm (TP)
C PERALATAN - -
- -
D Jumlah A + B + C 78,956.00 89,600.00
272 B.25.c 1 m2 Bekisting Dinding beton biasa menggunakan Kayu Papan 159,918.00 181,742.00
3/20 cm
- -
C PERALATAN - -
- -
C PERALATAN - -
- -
275 B.26.a 1 m2 Bekisting Pondasi dan sloof beton biasa dengan 110,308.00 117,106.00
Multipleks 12 cm / 18 cm (TP)
A TENAGA 27,600.00 30,900.00
C PERALATAN - -
- -
D Jumlah A + B + C 100,280.00 106,460.00
E OVERHEAD & PROFIT (CONTOH) 10% 10,028.00 10,646.00
276 B.26.b 1 m2 Bekisting Pondasi dan sloof beton biasa menggunakan 170,610.00 191,785.00
papan 3/20 cm
277 B.26.c 1 m2 Perancah/penyokong Bekisting Pondasi dan sloof beton 103,510.00 109,230.00
biasa menggunakan kaso 5/7, tinggi maksimum 2,00 m
C PERALATAN - -
- -
D Jumlah A + B + C 94,100.00 99,300.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,410.00 9,930.00
278 B.27.a 1 m2 Bongkar Bekisting secara Biasa (membersihkan dan 3,740.00 4,224.00
membereskan puing-puing)
C PERALATAN - -
D Jumlah A + B + C 3,400.00 3,840.00
E OVERHEAD & PROFIT (CONTOH) 10% 340.00 384.00
279 B.27.b 1 m2 Bongkar Bekisting secara Biasa secara hati-ahti (dan 5,610.00 6,336.00
membereskan puing-puing)
C PERALATAN - -
D Jumlah A + B + C 139,000.00 157,400.00
E OVERHEAD & PROFIT (CONTOH) 10% 13,900.00 15,740.00
281 B.28.b 100 m2 Menyirami air permukaan beton menggunakan media 187,000.00 224,730.00
terpal selama 4 hari
282 B.28.c 100 m2 Menyirami permukaan beton menggunakan media karung 506,000.00 573,100.00
goni selama 4 hari
C PERALATAN - -
D Jumlah A + B + C 460,000.00 521,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 46,000.00 52,100.00
Perhitungan praktis pembongkaran beton dan atau bertulang ditentukan oleh tingkat mutu beton
dan kemudahan pembongkarannya. Pada kondisi normal sering dihitung pembongkaran sekitar
2,5 kali upah pembuatan beton. Jika dibutuhkan analisa yang rinci pembongkaran beton
bertulang sebagai berikut :
287 B.30.c 1 m' Pasangan Water stop PVC lebar 230 mm - 320 mm 104,731.00 117,744.00
A TENAGA 11,040.00 12,360.00
L.01 0.080 OH Pekerja 75,000 85,000 6,000.00 6,800.00
L.02 0.040 OH Tukang Batu 95,000 105,000 3,800.00 4,200.00
L.03 0.0040 OH Kepala Tukang 110,000 120,000 440.00 480.00
L.04 0.008 OH Mandor 100,000 110,000 800.00 880.00
B BAHAN 84,170.00 94,680.00
1.050 m' Water stop PVC lebar 230 mm- 320 mm 80,000 90,000 84,000.00 94,500.00
0.010 kg Kawat Beton / Bindrad 17,000 18,000 170.00 180.00
C PERALATAN - -
288 B.30.d 1 m' Pasangan Water stop Ruber lebar 150 mm - 200 mm 149,600.00 162,442.50
A TENAGA 9,660.00 10,815.00
L.01 0.070 OH Pekerja 75,000 85,000 5,250.00 5,950.00
L.02 0.035 OH Tukang Batu 95,000 105,000 3,325.00 3,675.00
L.03 0.0035 OH Kepala Tukang 110,000 120,000 385.00 420.00
L.04 0.007 OH Mandor 100,000 110,000 700.00 770.00
B BAHAN 126,340.00 136,860.00
1.050 m' Water stop Ruber lebar 150 mm- 200 mm 120,000 130,000 126,000.00 136,500.00
0.020 kg Kawat Beton / Bindrad 17,000 18,000 340.00 360.00
C PERALATAN - -
289 F.01 1 m' Penetrasi Tiang Pancang Kayu Gelondongan Ø 15 - 20 cm 62,700.00 71,857.50
290 F.02 1 m' Penetrasi Tiang Pancang Kayu atau Dolken Ø 8 - 10 cm 13,667.50 15,680.50
A TENAGA 8,800.00 9,880.00
L.01 0.075 OH Pekerja 75,000 85,000 5,625.00 6,375.00
L.02 0.025 OH Tukang batu 95,000 105,000 2,375.00 2,625.00
L.04 0.008 OH Mandor 100,000 110,000 800.00 880.00
B BAHAN - -
- -
- -
C PERALATAN 3,625.00 4,375.00
0.025 hr Tripod tinggi 5 m' 125,000 150,000 3,125.00 3,750.00
0.025 hr Hammer 0,5 ton (manual) 20,000 25,000 500.00 625.00
- -
D Jumlah A + B + C 12,425.00 14,255.00
E OVERHEAD & PROFIT (CONTOH) 10% 1,242.50 1,425.50
F Harga Satuan Pekerjaan (D+E) 13,667.50 15,680.50
293 F.04.b 1 m' Penetrasi Tiang Pancang Beton Kotak 25 x 25 cm 79,640.00 88,968.00
A TENAGA 48,400.00 54,480.00
L.01 0.4800 OH Pekerja 75,000 85,000 36,000.00 40,800.00
L.02 0.0800 OH Tukang batu 95,000 105,000 7,600.00 8,400.00
L.04 0.0480 OH Mandor 100,000 110,000 4,800.00 5,280.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 24,000.00 26,400.00
0.0800 hr Tripod tinggi 7 m' 150,000 170,000 12,000.00 13,600.00
0.0800 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 12,000.00 12,800.00
100,000 110,000 - -
D Jumlah A + B + C 72,400.00 80,880.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,240.00 8,088.00
F Harga Satuan Pekerjaan (D+E) 79,640.00 88,968.00
294 F.04.c 1 m' Penetrasi Tiang Pancang Beton Kotak 30 x 30 cm 136,620.00 152,064.00
A TENAGA 97,200.00 108,540.00
L.01 0.5400 OH Pekerja 75,000 85,000 40,500.00 45,900.00
L.02 0.5400 OH Tukang batu 95,000 105,000 51,300.00 56,700.00
L.04 0.0540 OH Mandor 100,000 110,000 5,400.00 5,940.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 27,000.00 29,700.00
0.0900 hr Tripod tinggi 7 m' 150,000 170,000 13,500.00 15,300.00
0.0900 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 13,500.00 14,400.00
100,000 110,000 - -
D Jumlah A + B + C 124,200.00 138,240.00
E OVERHEAD & PROFIT (CONTOH) 10% 12,420.00 13,824.00
F Harga Satuan Pekerjaan (D+E) 136,620.00 152,064.00
295 F.04.d 1 m' Penetrasi Tiang Pancang Beton Kotak 40 x 40 cm 166,980.00 185,856.00
A TENAGA 118,800.00 132,660.00
L.01 0.6600 OH Pekerja 75,000 85,000 49,500.00 56,100.00
L.02 0.6600 OH Tukang batu 95,000 105,000 62,700.00 69,300.00
L.04 0.0660 OH Mandor 100,000 110,000 6,600.00 7,260.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 33,000.00 36,300.00
0.1100 hr Tripod tinggi 7 m' 150,000 170,000 16,500.00 18,700.00
0.1100 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 16,500.00 17,600.00
100,000 110,000 - -
D Jumlah A + B + C 151,800.00 168,960.00
E OVERHEAD & PROFIT (CONTOH) 10% 15,180.00 16,896.00
F Harga Satuan Pekerjaan (D+E) 166,980.00 185,856.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
296 F.04.e 1 m' Penetrasi Tiang Pancang (Hollow) Beton Ø 40 cm 99,550.00 111,210.00
A TENAGA 60,500.00 68,100.00
L.01 0.6000 OH Pekerja 75,000 85,000 45,000.00 51,000.00
L.02 0.1000 OH Tukang batu 95,000 105,000 9,500.00 10,500.00
L.04 0.0600 OH Mandor 100,000 110,000 6,000.00 6,600.00
B BAHAN - -
- m' Tiang pancang beton bertulang 40 x 40 cm - - - -
- -
C PERALATAN 30,000.00 33,000.00
0.1000 hr Tripod tinggi 7 m' 150,000 170,000 15,000.00 17,000.00
0.1000 hr Alat Pancang dan Hammer 2 ton 150,000 160,000 15,000.00 16,000.00
100,000 110,000 - -
D Jumlah A + B + C 90,500.00 101,100.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,050.00 10,110.00
F Harga Satuan Pekerjaan (D+E) 99,550.00 111,210.00
Penetrasi untuk 1 m' lebar turap (20 buah) Kayu Kaso 5/7
303 F.05.g 1 m' 104,511.00 117,518.50
tebal 7 cm
306 F.06.a 1 m' Penetrasi (1 buah) Turap Baja Profil Larsen lebar 350 mm 78,595.00 86,295.00
0.0500 hr Alat pancang & hammer 1,0 ton 150,000 160,000 7,500.00 8,000.00
0.0500 hr Las listrik diesel 250 A diesel 180,000 183,000 9,000.00 9,150.00
D Jumlah A + B + C 71,450.00 78,450.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,145.00 7,845.00
F Harga Satuan Pekerjaan (D+E) 78,595.00 86,295.00
**) Jika tidak diperlukan pengelasan, isikan HSD bahan & tukang listrik = 0
0.0900 hr Alat pancang & hammer 1,0 ton 150,000 160,000 13,500.00 14,400.00
0.0900 hr Las listrik diesel 250 A diesel 180,000 183,000 16,200.00 16,470.00
D Jumlah A + B + C 99,780.00 109,110.00
E OVERHEAD & PROFIT (CONTOH) 10% 9,978.00 10,911.00
F Harga Satuan Pekerjaan (D+E) 109,758.00 120,021.00
**) Jika tidak diperlukan pengelasan, isikan HSD bahan & tukang listrik = 0
310 F.07.b 1 m' Penetrasi 1 buah Turap Beton Precast 15 x 40 cm 77,440.00 88,968.00
A TENAGA 48,400.00 54,480.00
L.01 0.4800 OH Pekerja 75,000 85,000 36,000.00 40,800.00
L.02 0.0800 OH Tukang batu 95,000 105,000 7,600.00 8,400.00
L.04 0.0480 OH Mandor 100,000 110,000 4,800.00 5,280.00
B BAHAN - -
m' Beton bertulang precast 135,000 145,000 - -
C PERALATAN 22,000.00 26,400.00
0.08 hr Tripod tinggi 5 m' 125,000 170,000 10,000.00 13,600.00
0.08 hr Alat Pancang & Hammer 2 ton 150,000 160,000 12,000.00 12,800.00
bh Alat Penyambung Tiang Pancang - - - -
D Jumlah A + B + C 70,400.00 80,880.00
E OVERHEAD & PROFIT (CONTOH) 10% 7,040.00 8,088.00
F Harga Satuan Pekerjaan (D+E) 77,440.00 88,968.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
311 F.07.c 1 m' Penetrasi 1 buah Turap Beton Precast 22 x 50 cm 96,800.00 111,210.00
A TENAGA 60,500.00 68,100.00
L.01 0.6000 OH Pekerja 75,000 85,000 45,000.00 51,000.00
L.02 0.1000 OH Tukang batu 95,000 105,000 9,500.00 10,500.00
L.04 0.0600 OH Mandor 100,000 110,000 6,000.00 6,600.00
B BAHAN - -
m' Beton bertulang precast 250,000 270,000 - -
C PERALATAN 27,500.00 33,000.00
0.1 hr Tripod tinggi 5 m' 125,000 170,000 12,500.00 17,000.00
0.1 hr Alat Pancang & Hammer 2 ton 150,000 160,000 15,000.00 16,000.00
- - - -
D Jumlah A + B + C 88,000.00 101,100.00
E OVERHEAD & PROFIT (CONTOH) 10% 8,800.00 10,110.00
F Harga Satuan Pekerjaan (D+E) 96,800.00 111,210.00
T.12 PERKUAT DINDING GALIAN SANGAT TERGANTUNG PADA POTENSI GALIAN TANAHNYA,
- UNT TANAH BIASA & TANAH BERBATU SERING DIPERLUKAN JIKA KEDALAMAN GALIAN LEBIH DARI 2 m
- UNT TANAH CADAS / KERAS APALAGI BATU PADA UMUMNYA TIDAK DIPERLUKAN PERKUATAN
HAL INI SERING DILAKUKAN PADA GALIAN TANAH DENGAN KEDALAMAN > 1 m DALAM RANGKA PEMASANGAN
PIPA, GORONG-GORONG ATAU BOX CULVERT
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN RANGKA & DINDING
A.2 a) TIANG RANGKA PERKUATAN DINDING
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
- DIPAKAI KE 2 0.02840 m3 0.860 OH 0.430 OH 0.086 OH 0.125 0.0101 m3 0.800 OH 0.300 OH 0.080 OH 0.120 0.5
- DIPAKAI KE 3 0.02380 m3 0.0085 m3
4.080 kg 1.000 OH 0.500 OH 0.100 OH 0.120 2.720 kg 0.72 OH 0.38 OH 0.072 OH 0.110 0.8
2.970 kg 1.980 kg
3 BAJA INP - 10 13.100 kg 4.950 kg
7.200 kg 1.200 OH 0.600 OH 0.120 OH 0.100 2.720 kg 0.86 OH 0.43 OH 0.086 OH 0.090 1
5.240 kg 1.980 kg
b) DINDING PERKUATAN
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN
KE-2 1.80 m2 0.400 OH 0.200 OH 0.040 OH 0.06 1.50 m2 0.300 OH 0.150 OH 0.030 OH 0.050
KE-2 0.034 m3 0.500 OH 0.250 OH 0.050 OH 0.06 0.028 m3 0.376 OH 0.188 OH 0.0375 OH 0.070
KE-3 0.029 m3 0.024 m3
KE-2 0.130 m3 0.480 OH 0.230 OH 0.045 OH 0.09 0.108 m3 0.338 OH 0.169 OH 0.0338 OH 0.080
TABEL KOEFISIEN PEKERJAAN & BAHAN PERKUATAN DINDING GALIAN DENGAN TURAP
A.3
BAHAN PEKERJA TUKANG MANDOR PERALATAN BAHAN PEKERJA TUKANG MANDOR PERALATAN (m)
1 KASO 5/7 DIPAKAI KE-1 0.049612 m3 0.033075 m3
KE-2 0.033488 m3 0.840 OH 0.280 OH 0.084 OH 0.10 0.022326 m3 0.570 OH 0.190 OH 0.057 OH 0.070 5
KE-2 0.061236 m3 1.280 OH 0.420 OH 0.126 OH 0.12 0.040824 m3 0.84 OH 0.28 OH 0.064 OH 0.06 5
15.00 kg 10.00 kg
28.860 kg 2.100 OH 0.700 OH 0.210 OH 0.160 19.220 kg 1.5 OH 0.5 OH 0.15 OH 0.120 5
21.000 kg 14.000 kg
28.750 kg 19.160 kg
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
56 T.12.a 1 m' PERKUATAN DINDING GALIAN UNT 1 m' PALING BAWAH 1,062,391.00 1,263,339.00
contoh MENGGUNAKAN BAJA INP-10 & BALOK KAYU 8/12
A TENAGA 210,450.00 236,010.00
L.01 1.660 OH Pekerja 75,000 85,000 124,500.00 141,100.00
L.02 0.730 OH Tukang 95,000 105,000 69,350.00 76,650.00
L.04 0.166 OH Mandor 100,000 110,000 16,600.00 18,260.00
B BAHAN 738,260.00 893,480.00
5.240 kg Tiang perkuatan dengan INP -10 14,000 14,500 73,360.00 75,980.00
0.109 m3 Dinding perkuatan kayu 8/12 6,100,000 7,500,000 664,900.00 817,500.00
C PERALATAN 17,100.00 19,000.00
0.190 hr Crane 2 ton 90,000 100,000 17,100.00 19,000.00
D Jumlah A + B + C 965,810.00 1,148,490.00
E OVERHEAD & PROFIT (CONTOH) 10% 96,581.00 114,849.00
F Harga Satuan Pekerjaan (D+E) 1,062,391.00 1,263,339.00
C PERALATAN - -
e) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C - -
E OVERHEAD & PROFIT (CONTOH) 10% - -
F Harga Satuan Pekerjaan (D+E) - -
44 T.12.c 1 m' PERKUATAN DINDING GALIAN DG TURAP PALING BAWAH 438,350.00 471,900.00
contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 175,000.00 196,500.00
L.01 1.500 OH Pekerja 75,000 85,000 112,500.00 127,500.00
L.02 0.500 OH Tukang 95,000 105,000 47,500.00 52,500.00
L.04 0.150 OH Mandor 100,000 110,000 15,000.00 16,500.00
B BAHAN 210,000.00 217,500.00
15.000 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 14,000 14,500 210,000.00 217,500.00
- -
C PERALATAN 13,500.00 15,000.00
0.150 hr Crane 2 ton 90,000 100,000 13,500.00 15,000.00
D Jumlah A + B + C 398,500.00 429,000.00
E OVERHEAD & PROFIT (CONTOH) 10% 39,850.00 42,900.00
F Harga Satuan Pekerjaan (D+E) 438,350.00 471,900.00
45a T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI
A TENAGA
L.01 g) OH Pekerja (Tabel A.3)
L.02 h) OH Tukang
L.04 i) OH Mandor
B BAHAN - -
f) m3/kg Perkuatan Dinding galian dg Turap (Tabel A.3)
C PERALATAN - -
j) hr Tripod/Tackle Handle/Crane 2 ton
D Jumlah A + B + C - -
E OVERHEAD & PROFIT (CONTOH) 10% - -
F Harga Satuan Pekerjaan (D+E) - -
45 T.12.d 1 m' PERKUATAN DINDING GALIAN DG TURAP UNTUK PENAMBAHAN TINGGI 318,890.00 344,520.00
contoh MENGGUNAKAN TURAP BAJA INP-8
A TENAGA 140,000.00 157,200.00
L.01 1.200 OH Pekerja 75,000 85,000 90,000.00 102,000.00
L.02 0.400 OH Tukang 95,000 105,000 38,000.00 42,000.00
L.04 0.120 OH Mandor 100,000 110,000 12,000.00 13,200.00
B BAHAN 140,000.00 145,000.00
10.00 kg Perkuatan Dinding galian dg Turap (Tabel A.3) 14,000 14,500 140,000.00 145,000.00
- -
C PERALATAN 9,900.00 11,000.00
0.110 hr Crane 2 ton 90,000 100,000 9,900.00 11,000.00
D Jumlah A + B + C 289,900.00 313,200.00
E OVERHEAD & PROFIT (CONTOH) 10% 28,990.00 31,320.00
F Harga Satuan Pekerjaan (D+E) 318,890.00 344,520.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
Koefisien pada AHSP T.15.a adalah kondisi normal, untuk hal khusus seperti angkutan melalui sungai dengan kedalaman s/d 0,5 m dikalikan 1,2; sedang untuk kedalaman
sungai 1 m dikalikan 1,5
T.15.a. ANGKUTAN MATERIAL DAN ATAU HASIL GALIAN UNTUK JARAK HARIZONTAL (DATAR)
AHSP T.15.a ini berlaku pada angkutan material untuk jarak harizontal (datar) dan termasuk juga medan dengan pelandaian menurun 1V:5H sampai dengan pelandaian
1V:10H yang dihitung sebagai panjang lintasannya.
MENGANGKUT MATERIAL ATAU DAN HASIL GALIAN DG
63 T.15.a.1 1 m3 21,824.00 24,688.40
JARAK ANGKUT 5 m
A TENAGA 19,840.00 22,444.00
L.01 0.2480 OH Pekerja 75,000 85,000 18,600.00 21,080.00
L.04 0.0124 OH Mandor 100,000 110,000 1,240.00 1,364.00
B BAHAN - -
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
1 2 3 4 5 6 7 8 9=4X7 10 = 4 X 8
C PERALATAN - -
C PERALATAN - -
C PERALATAN - -