Harga Hasil
NO Jenis bahan Satuan Tamabahan PPn 10 % tambahan PPh 1,5 % Harga Dibulatkan
Survay (Rp)
Kepala
Kode Anl Koef. Sat Uraian volume pekerja Tukang Mandor keramik Batu Belah
Tukang
Bambu,paku
Semen PC pasir pasang Arugan sirtu split hebel besi q 6 Besi q 8
dll
0.39
5.60
0.07
0.16
2.00
42.0000
35.0000
2.4000
2.0000
12.64
3.0294
Bambu,paku
Semen PC pasir pasang Arugan sirtu split hebel besi q 6 Besi q 8
dll
28.7999
24.00
12.11
4.33
13.82
1.05
1.63
27.0000
20.00
8.36
3.61
8.64
0.66
1.02
36.0000
24.00
12.11
4.33
13.82
1.05
1.63
12
-
28.8000
30.72
0.08
Bambu,paku
Semen PC pasir pasang Arugan sirtu split hebel besi q 6 Besi q 8
dll
-
-
14.00
0.06
171.00
342.00
34.20
2.85
96.00
4.20
1.40
0.25
0.18
Bambu,paku
Semen PC pasir pasang Arugan sirtu split hebel besi q 6 Besi q 8
dll
2.70
2.70
7.02
2.70
2.70
7.02
99 7 44 4 12 33 68