Harga (Rp) No Uraian Pekerjaan Satuan Volume Satuan (Rp) Jumlah (Rp) a b c d e f I PEKERJAAN FLUR LANTAI 1 pasir kasar dum 1 Rp 500,000 Rp 500,000 2 semen tonasa kg 15.00 Rp 115,000 Rp 1,725,000 Jumlah I Rp 2,225,000 II PEKERJAAN RANGKA DINDING 1 kayu 5X10 M³ 1.00 2,700,000 2,700,000 2 paku 10 kg 5 35,000 175,000 3 paku 12 kg 2 35,000 70,000 4 paku 5 kg 3 35,000 105,000 5 papan 3 cm kg 1 2,700,000 2,700,000 Jumlah II Rp 5,750,000 III PEKERJAAN DINDING GRC 1 GRC 4 MM lbr 35.00 Rp 115,000 Rp 4,025,000 2 paku GRC dos 2.00 Rp 130,000 Rp 260,000 Jumlah III Rp 4,285,000 IV PEKERJAAN ATAP 1 kayu 5x5 M³ 1.00 Rp 2,700,000 Rp 2,700,000 2 seng bjl 25 lbr 50.00 Rp 85,000 Rp 4,250,000 3 seng bumbungan m1 20.00 Rp 15,000 Rp 300,000 4 paku 10 kg 5.00 Rp 35,000 Rp 175,000 5 paku seng kg 5.00 Rp 35,000 Rp 175,000 Jumlah IV Rp 7,600,000 V PEKERJAAN KAMAR MANDI 1 kayu 5x10 ptg 30.00 Rp 60,000 Rp 1,800,000 2 kayu 5x5 ptg 15.00 Rp 60,000 Rp 900,000 3 semen tonasa zak 10.00 Rp 115,000 Rp 1,150,000 4 dinding seng spandek lbr 5.00 Rp 250,000 Rp 1,250,000 5 kran air bh 3.00 Rp 50,000 Rp 150,000 6 pipa 1/2 staf 5.00 Rp 100,000 Rp 500,000 7 sambungan elbow & sambungan T bh 10.00 Rp 50,000 Rp 500,000 8 seltip bh 1.00 Rp 50,000 Rp 50,000 9 drak kran bh 3.00 Rp 50,000 Rp 150,000 10 hensel 3 pintu bh 6.00 Rp 30,000 Rp 180,000 11 closet jongkok bh 3.00 Rp 250,000 Rp 750,000 12 pipa pvc 3 inc staf 5.00 Rp 150,000 Rp 750,000 Jumlah V Rp 8,130,000 VI UPAH KERJA TUKANG 1 upah kerja tukang hok 3 Rp 2,000,000 Rp 6,000,000 Jumlah VI Rp 6,000,000 JUMLAH TOTAL Rp 33,990,000
KET: BANGUNAN FULL KAYU
Selasa 07 november 2023
Dibuat oleh Diperiksa Disetujui
Faldano Abd Rahman Bartholomeus Adjas Mesdi Manurapon