Anda di halaman 1dari 3

RENCANA ANGGARAN BIAYA (RAB)

PEKERJAAN : PENYIMPENAN IDA BETARA


LOKASI : PAIBON DADIA SIRA ARYA KUBON TUBUH TIRTA SARI ULAKAN
TAHUN : 2020

hal: 1
NO URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JML. HARGA
1 2 3 4 5 6
A PEKERJAAN BETON
1 pasir 1.5 truck Rp 1,300,000 Rp 1,950,000
2 koral 0.5 truck Rp 1,700,000 Rp 850,000
3 semen 80 zak Rp 52,000 Rp 4,160,000
4 besi 6 8 bt Rp 29,000 Rp 232,000
5 besi 8 120 bt Rp 49,000 Rp 5,880,000
6 kawat bendrat 1 rol Rp 325,000 Rp 325,000
7 triplek 9mm 20 lbr Rp 115,000 Rp 2,300,000
8 usuk steger 0.5 m3 Rp 2,000,000 Rp 1,000,000
9 paku 7cm 5 kg Rp 19,000 Rp 95,000
10 paku 5cm 3 kg Rp 19,000 Rp 57,000
11 paku 3cm 1 kg Rp 20,000 Rp 20,000
2 pipa listrik 3 bt Rp 10,000 Rp 30,000
3 embodus & teedus 4 bh Rp 3,000 Rp 12,000
4 kabel listrik 25 m Rp 12,000 Rp 300,000
5 fitingan tempel 2 bh Rp 22,000 Rp 44,000
6 saklar broco 1 bh Rp 17,000 Rp 17,000
7 stopkontak broco 1 bh Rp 17,000 Rp 17,000
8 kusen 1 set Rp 350,000 Rp 350,000
9 daun jendela kayu 1 set Rp 350,000 Rp 350,000
1 slot solid 1 set Rp 22,000 Rp 22,000
2 engsel solid 1 set Rp 27,000 Rp 27,000
3 kori & jendela bali 1 set Rp 12,000,000 Rp 12,000,000
4 konci pintu bali 1 set Rp 85,000 Rp 85,000
TOTAL SUB A Rp 30,123,000

B PEKERJAAN FINISHING
2 cat tarib beton vinilex 1 gln Rp 115,000 Rp 115,000
3 plamir tartar 1 gln Rp 45,000 Rp 45,000
4 amplas 5 m Rp 10,000 Rp 50,000
5 kuas no.5 2 bh Rp 12,000 Rp 24,000
6 tegel lantai 12 m2 Rp 95,000 Rp 1,140,000
7 tegel dinding 45 m2 Rp 65,000 Rp 2,925,000
8 lis gipsum 14 m Rp 26,000 Rp 364,000
9 mill 6 zak Rp 12,500 Rp 75,000
SUB TOTAL B Rp 4,738,000
hal: 2
NO URAIAN PEKERJAAN VOL. SAT. HARGA SATUAN JML. HARGA
1 2 3 4 5 6
C PEKERJAAN TARIB LUAR
1 lambe sering 76 bt Rp 60,000 Rp 4,560,000
2 usuk 4x6x400 25 bt Rp 40,000 Rp 1,000,000
3 paku 7cm 1 kg Rp 19,000 Rp 19,000
4 paku 5cm 1 kg Rp 19,000 Rp 19,000
5 paku 3cm 1 kg Rp 20,000 Rp 20,000
6 lis tarib 8 bt Rp 58,000 Rp 464,000
7 mowilex 1 dus Rp 876,000 Rp 876,000
8 kuas no. 2.5 2 bh Rp 6,000 Rp 12,000

SUB TOTAL C Rp 6,970,000

PEKERJAAN TEMPELAN PASIR MELILA


D SEMI UKIR LELEMONAN
1 tembok 36 m Rp 21,600,000
2 sendi dan kapu-kapu 4 ps Rp 2,800,000
3 kupak lambang 15 mt Rp 7,500,000
4 bahan pasir dan cat 1 set Rp 14,000,000
SUB TOTAL D Rp 45,900,000

E ONGKOS PENGERJAAN
1 ongkos pekerjaan beton Rp 15,000,000
2 ongkos pekerjaan finishing Rp 4,500,000
3 ongkos pekerjaan tarib Rp 600,000
4 ongkos angkut pasir, koral, dan semen Rp 2,000,000
SUB TOTAL E Rp 22,100,000
REKAPITULASI
PEKERJAAN : PENYIMPANAN IDA BETARA
LOKASI : PAIBON DADIA SIRA ARYA KUBON TUBUH TIRTA SARI ULAKAN
TAHUN : 2020

NO URAIAN PEKERJAAN KETERANGAN

A PEKERJAAN BETON Rp 30,123,000

B PEKERJAAN FINISHING Rp 4,738,000

C PEKERJAAN TARIB LUAR Rp 6,970,000

PEKERJAAN TEMPELAN PASIR MELILA SEMI UKIR


D LELEMONAN Rp 45,900,000

E ONGKOS PENGERJAAN Rp 22,100,000

TOTAL Rp 109,831,000

Tebilang: seratus sembilan jutadelapan ratus tiga puluh satu ribu rupiah