DAFTAR HARGA SATUAN BAHAN BANG UNAN

SUMBER DATA : PASARAN BE BAS


D A E R A H : KOTA SEMARANG & SEKITAR
EDISI NOP 2016

HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 200,000 220,000 Rp 210,000.00
Bulat Belah m3 290,000 300,000 Rp 295,000.00
Pecah 10/15 m3 250,000 300,000 Rp 275,000.00
Pecah 5/7 m3 300,000 350,000 Rp 325,000.00
Pecah 3/5 m3 330,000 360,000 Rp 345,000.00
2 KERIKIL Timbun m3 130,000 140,000 Rp 135,000.00
Sawur / Koral m3 140,000 160,000 Rp 150,000.00
Beton 0,5/1 m3 350,000 370,000 Rp 360,000.00
Beton ,1/2 m3 380,000 390,000 Rp 385,000.00
Beton ,2/3 m3 370,000 390,000 Rp 380,000.00
Biasa m3 240,000 260,000 Rp 250,000.00
Tras Giling m3 280,000 330,000 Rp 305,000.00
3 BATU BATA ex lokal bh 600 650 Rp 625.00
Rp -
4 PASIR Urug m3 200,000 230,000 Rp 215,000.00
Pasang m3 310,000 320,000 Rp 315,000.00
Beton m3 350,000 390,000 Rp 370,000.00
5 TANAH Padas m3 100,000 125,000 Rp 112,500.00
Liat m3 110,000 120,000 Rp 115,000.00
6 KAPUR Pasang m3 310,000 350,000 Rp 330,000.00
Semen Merah m3 175,000 185,000 Rp 180,000.00
7 PORTLAND CEMENT Rp -
Merk I 40 kg zak 45,000 48,000 Rp 46,500.00
Merk I 50 kg zak 58,000 61,000 Rp 59,500.00
Merk II 40 kg zak 44,000 48,000 Rp 46,000.00
Merk II 50 kg zak 58,000 60,000 Rp 59,000.00
Semen Putih 40 kg zak 82,500 85,000 Rp 83,750.00
Semen Putih 50 kg zak 90,000 95,000 Rp 92,500.00
Semen warna kg 11,000 15,000 Rp 13,000.00
Rp -
II BAHAN PE NUTUP ATAP Rp -
Rp -
1 SIRAP (100 lbr) pak 185,000 190,000 Rp 187,500.00
Rp -
2 GENTENG BETON Genteng Beton Warna standard bh 6,000 7,000 Rp 6,500.00
Genteng Beton Warna Special bh 9,500 10,500 Rp 10,000.00
Genteng Beton Warna Khusus bh 14,000 15,200 Rp 14,600.00
Kerpus Beton Warna Standard bh 8,500 10,000 Rp 9,250.00
Kerpus Beton Warna Special bh 11,500 12,000 Rp 11,750.00
Kerpus Beton Warna Khusus bh 13,000 13,500 Rp 13,250.00
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
3 GENTENG TANAH LIAT Rp -
Vlaam/Plentong bh 2,300 2,400 Rp 2,350.00
Kodok bh 2,900 3,200 Rp 3,050.00
Kodok Glasur bh 4,000 4,250 Rp 4,125.00
Nok kerpus Kodok bh 6,500 6,800 Rp 6,650.00
Nok kerpus Kodok Glasur bh 8,000 8,500 Rp 8,250.00
Plentong super besar 18 bh/m2 bh 5,100 5,350 Rp 5,225.00
Nok kerpus plentong super bh 9,000 9,200 Rp 9,100.00
4 GENTENG KACA Rp -
Vlaam tebal 2 mm bh 10,500 12,500 Rp 11,500.00
Vlaam tebal 3 mm bh 13,500 15,000 Rp 14,250.00
Kodok tebal 2 mm bh 10,000 12,500 Rp 11,250.00
Kodok tebal 3 mm bh 13,000 17,500 Rp 15,250.00
Rp -
5 ASBES GELOMBANG BESAR Rp -
. 200 cm X 102 cm X 5 mm bh 86,000 90,000 Rp 88,000.00
. 225 cm X 102 cm X 5 mm bh 95,000 102,000 Rp 98,500.00
. 250 cm X 102 cm X 5 mm bh 103,000 109,000 Rp 106,000.00
. 200 cm X 102 cm X 6 mm bh 92,000 95,000 Rp 93,500.00
. 225 cm X 102 cm X 6 mm bh 95,000 100,000 Rp 97,500.00
. 250 cm X 102 cm X 6 mm bh 105,000 110,000 Rp 107,500.00
Asbes Gelombang Kecil Rp -
. 150 cm X 105 cm X 4 mm bh 42,000 45,000 Rp 43,500.00
. 180 cm X 105 cm X 4 mm bh 50,500 52,000 Rp 51,250.00
. 210 cm X 105 cm X 4 mm bh 59,000 60,000 Rp 59,500.00
. 240 cm X 105 cm X 4 mm bh 65,000 68,000 Rp 66,500.00
. 270 cm X 105 cm X 4 mm bh 76,000 76,500 Rp 76,250.00
. 300 cm X 105 cm X 4 mm bh 80,000 85,000 Rp 82,500.00
ONDULINE : 95 cm x 200cm x 0.3mm lbr 145,000 155,000 Rp 150,000.00
ONDUVILLA : 40cm x 106 cm x 0,3mm lbr 80,000 90,000 Rp 85,000.00
NOK Jabes nok Rp -
. Kerpus Genteng bh 31,000 40,000 Rp 35,500.00
. Stel Besar bh 45,000 50,000 Rp 47,500.00
. Paten Besar bh 43,000 47,000 Rp 45,000.00
Nokstel gelombang harflex Rp -
. Stel Besar bh 44,000 48,000 Rp 46,000.00
. Patent Besar bh 27,000 30,500 Rp 28,750.00
. Plat besar bh 51,000 55,000 Rp 53,000.00
NOK UNT ONDULINE & ONDUVILLA Rp -
Ukuran 50cm x 50 cm x 0,3mm lbr 105,000 110,000 Rp 107,500.00
6 ASBES PLAT Rp -
. 100cm X 100 cm X 3 mm bh 15,500 16,000 Rp 15,750.00
. 100cm X 100 cm X 4 mm bh 20,000 23,000 Rp 21,500.00
. 50 cm X 200 cm X 3 mm bh 14,000 15,000 Rp 14,500.00
. 40 cm X 200 cm X 3 mm bh 13,000 14,000 Rp 13,500.00
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
FIBER PLAT uk. 100cm x 100cm x 4mm lbr 25,000 30,000 Rp 27,500.00
unt Plafond uk. 120cm x 240cm x 4mm lbr 69,000 72,500 Rp 70,750.00
uk. 122cm x 244cm x 4mm lbr 70,000 75,000 Rp 72,500.00
GRC BOARD uk.122cm x 244cm x 5mm lbr 100,000 108,000 Rp 104,000.00
uk.122cm x 244cm x 6mm lbr 125,000 132,000 Rp 128,500.00
uk.122cm x 244cm x 8mm lbr 185,000 192,000 Rp 188,500.00
uk.122cm x 244cm x 10mm lbr 245,000 260,000 Rp 252,500.00
7 FIBRE GLASS (JABES) Rp -
180 X 92 cm bh 50,000 60,000 Rp 55,000.00
200 X 92 cm bh 57,500 65,000 Rp 61,250.00
250 X 92 cm bh 65,500 74,000 Rp 69,750.00
180 X 105 cm bh 68,000 90,000 Rp 79,000.00
210 X 105 cm bh 70,000 105,000 Rp 87,500.00
250 X 105 cm bh 80,000 120,000 Rp 100,000.00
8 SENG PLAT Rp -
BJLS 0,18 lebar 55 cm m' 22,000 24,500 Rp 23,250.00
BJLS 0,20 lebar 55 cm m' 24,500 27,000 Rp 25,750.00
BJLS 0,28 lebar 55 cm m' 26,500 30,000 Rp 28,250.00
BJLS 0,30 lebar 55 cm m' 30,000 35,000 Rp 32,500.00
9 SENG GELOMBANG Rp -
BJLS 0,18 panjang 180 cm lbr 40,000 45,000 Rp 42,500.00
BJLS 0,20 panjang 180 cm lbr 41,500 55,000 Rp 48,250.00
BJLS 0,30 panjang 180 cm lbr 59,000 60,000 Rp 59,500.00
BJLS 0,40 panjang 180 cm lbr 69,000 75,000 Rp 72,000.00
III . B A H A N K A Y U Rp -
1 JATI Papan m3 22,000,000 23,000,000 Rp 22,500,000.00
Balok/pesagen m3 20,000,000 20,500,000 Rp 20,250,000.00
2 KAMPER Papan m3 7,600,000 7,800,000 Rp 7,700,000.00
Balok/pesagen m3 6,900,000 7,500,000 Rp 7,200,000.00
3 KRUING Papan m3 6,250,000 7,000,000 Rp 6,625,000.00
Balok/pesagen m3 5,500,000 5,900,000 Rp 5,700,000.00
4 MERANTI Papan m3 4,800,000 5,100,000 Rp 4,950,000.00
Balok/pesagen m3 4,500,000 4,600,000 Rp 4,550,000.00
5 LANAN Papan m3 2,050,000 3,300,000 Rp 2,675,000.00
Balok/pesagen m3 2,000,000 2,100,000 Rp 2,050,000.00
6 BENGKIRAI Papan m3 10,000,000 12,000,000 Rp 11,000,000.00
Balok/pesagen m3 9,375,000 9,850,000 Rp 9,612,500.00
7 DOLKEN Sedang 8 x 10 x 400 cm bt 21,000 24,000 Rp 22,500.00
Kecil 6 x 7 x 400 cm bt 18,000 21,000 Rp 19,500.00
Besar 10 x 12 x 400 cm bt 31,000 34,000 Rp 32,500.00
Kayu cetakan m3 2,200,000 2,700,000 Rp 2,450,000.00
Kayu bakar m3 150,000 170,000 Rp 160,000.00
Bambu bt 10,000 12,000 Rp 11,000.00
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
IV . BAHAN PENUTUP DINDING / LANTAI Rp -
1 UBIN (TEGEL BIASA) Rp -
PC polos 30 X 30 cm m2 34,000 36,000 Rp 35,000.00
20 X 20 cm m2 32,000 34,000 Rp 33,000.00
PC warna 30 X 30 cm m2 45,000 46,000 Rp 45,500.00
20 X 20 cm m2 40,000 42,000 Rp 41,000.00
Teraso 30 X 30 cm m2 52,000 56,000 Rp 54,000.00
2 TEGEL PLINT Rp -
PC warna 10 X 20 cm bh 5,200 5,500 Rp 5,350.00
PC abu-abu 15 x 20 bh 5,100 6,000 Rp 5,550.00
Rp -
3 POLIS UBIN Lantai/badan m' Rp -
Plint m' Rp -
Trap m' Rp -
Rp -
4 UBIN PORSELIN Rp -
Lokal 11 X 11 putih dos 42,000 43,000 Rp 42,500.00
11 X 11 warna dos 45,000 46,000 Rp 45,500.00
Lokal 15 X 15 putih dos 45,000 47,500 Rp 46,250.00
15 X 15 warna dos 46,000 49,000 Rp 47,500.00
5 MOZAIK PORSELIN Rp -
10 X 20 cm m2 50,000 55,000 Rp 52,500.00
15 X 15 cm m2 51,000 55,000 Rp 53,000.00
20 X 20 cm m2 52,000 60,000 Rp 56,000.00
20 X 25 cm m2 52,000 56,000 Rp 54,000.00
Rp -
6 Keramik 30 X 30 cm m2 52,000 57,000 Rp 54,500.00
20 X 20 cm m2 52,000 56,000 Rp 54,000.00
33 x 33 cm m2 52,000 60,000 Rp 56,000.00
25 x 25 cm m2 51,000 55,000 Rp 53,000.00
15 x 20 cm m2 52,000 57,000 Rp 54,500.00
2,250 2,500 Rp 2,375.00
7 Parquet Jati m2 210,000 310,000 Rp 260,000.00
8 Batu Paros m2 110,000 115,000 Rp 112,500.00
9 Batu Tempel Hitam m2 105,000 115,000 Rp 110,000.00
10 GRANITO 40 x 40 cm m2 220,000 250,000 Rp 235,000.00
30 x 30 cm m2 300,000 320,000 Rp 310,000.00
11 Marmer m2 475,000 480,000 Rp 477,500.00
V . BAHAN CE TAK Rp -
1 BUIS BETON 10 cm - 100 cm bh 29,000 39,000 Rp 34,000.00
20 cm - 100 cm bh 42,500 50,000 Rp 46,250.00
30 cm - 100 cm bh 64,000 70,000 Rp 67,000.00
50 cm - 100 cm bh 110,000 135,000 Rp 122,500.00
60 cm - 100 cm bh 185,000 190,000 Rp 187,500.00
70 cm - 100 cm bh 225,000 265,000 Rp 245,000.00
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
U 10 cm - 100 cm bh 22,000 22,500 Rp 22,250.00
U 15 cm - 100 cm bh 30,500 40,000 Rp 35,250.00
U 20 cm - 100 cm bh 39,000 45,000 Rp 42,000.00
U 30 cm - 100 cm bh 45,000 55,000 Rp 50,000.00
U 50 cm - 100 cm bh - - Rp -
2 LUBANG ANGIN (ROSTER) PC + PASIR Rp -
10 X 20 cm bh 5,600 7,500 Rp 6,550.00
20 X 20 cm bh 6,300 8,000 Rp 7,150.00
25 X 25 cm bh 6,800 8,500 Rp 7,650.00
30 X 30 cm bh 7,200 9,000 Rp 8,100.00
15 X 25 cm bh 7,500 8,200 Rp 7,850.00
15 X 30 cm bh 7,500 8,500 Rp 8,000.00
VI . B A H A N B E S I Rp -
1 BESI BETON besi beton polos kg 8,500 9,200 Rp 8,850.00
besi beton prestress kg 12,000 12,500 Rp 12,250.00
besi beton ulir kg 11,000 11,500 Rp 11,250.00
Rp -
2 BESI PLAT Besi Strip kg 12,000 12,500 Rp 12,250.00
Rp -
3 BESI PROFIL Besi Profil kg 12,500 12,800 Rp 12,650.00
a BAJA RINGAN Rp -
GALVALUME lebar : 7,5cm tebal : 1mm btg 125,000 Rp 62,500.00
type CT 75 lebar : 7,5cm tebal : 0.75mm btg 85,000 Rp 42,500.00
lebar : 7,5cm tebal : 0,65mm btg 80,000 Rp 40,000.00
b type RT 12 tinggi : 3,5 cm, tebal : 0,45mm btg 45,000 Rp 22,500.00
type RT 10 tinggi : 3,0 cm, tebal : 0,45mm btg 40,000 Rp 20,000.00
c HOLLOW GALVANIS LIPAT Rp -
tinggi 2 cm; tebal : 0,3mm btg 18,000 22,000 Rp 20,000.00
tinggi 4 cm; tebal : 0,3 mm btg 24,000 30,000 Rp 27,000.00
4 JARING - JARING BAJA Rp -
Diameter 4 - 15 kg 12,200 12,500 Rp 12,350.00
Diameter 6 - 15 kg 13,000 13,500 Rp 13,250.00
Kawat Bronjong kg 9,500 10,000 Rp 9,750.00
5 BESI SIKU L 40 X 40 X 4 btg 94,000 100,000 Rp 97,000.00
L 50 X 50 X 5 btg 145,000 155,000 Rp 150,000.00
L 60 X 60 X 6 btg 210,000 220,000 Rp 215,000.00
Rp -
6 KAWAT - Ikat beton/bendrat kg 13,500 14,250 Rp 13,875.00
- Harmonika 12 X 45 mm m2 20,000 20,500 Rp 20,250.00
- Harmonika 12 X 24 mm m2 20,000 21,000 Rp 20,500.00
- Harmonika 14 X 30 mm m2 20,000 24,000 Rp 22,000.00
- Harmonika 14 X 35 mm m2 19,000 21,000 Rp 20,000.00
- Kawat Nyamuk Nylon m2 9,500 12,000 Rp 10,750.00
- Kawat Kasa m2 18,000 20,000 Rp 19,000.00
- Saringan pasir m2 15,000 20,000 Rp 17,500.00
- Kawat loket m2 15,000 22,500 Rp 18,750.00
- Kawat duri rol 110,000 135,000 Rp 122,500.00
- Kawat bronjong kg 25,000 27,500 Rp 26,250.00
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)

VII . B A H A N P I P A
1 Pipa PVC SII SCJ , S - 12,5 (10 bar)
Pipa PVC DN 20 ( " ) AW JIS btg 28,000 30,000 panjang 4 m
Pipa PVC DN 25 ( " ) AW JIS btg 34,000 36,000 panjang 4 m
Pipa PVC DN 32 ( 1" ) AW JIS btg 37,000 45,000 panjang 4 m
Pipa PVC DN 40 ( 1" ) btg 60,000 68,000 panjang 4 m
Pipa PVC DN 63 ( 2" ) btg 95,000 105,000 panjang 4 m
Pipa PVC DN 90 ( 3" ) btg 120,500 185,000 panjang 4 m
Pipa PVC DN 110 ( 4" ) btg 270,000 280,000 panjang 4 m
Pipa PVC DN 160 ( 6" ) btg 530,000 550,000 panjang 4 m
Pipa PVC DN 200 ( 8" ) btg 900,000 1,050,000 panjang 4 m
Pipa PVC DN 250 ( 10" ) btg - - panjang 4 m
Pipa PVC DN 315 ( 12" ) btg - - panjang 4 m

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN " btg 85,000 105,000 panjang 6 m
Pipa Medium B Galvanis DN 25 ( " ) btg 115,000 150,000 panjang 6 m
Pipa Medium B Galvanis DN 32 ( 1" ) btg 135,000 180,000 panjang 6 m
Pipa Medium B Galvanis DN 50 ( 1" ) btg 170,000 220,000 panjang 6 m
Pipa Medium B Galvanis DN 63 ( 2" ) btg 225,000 290,000 panjang 6 m
Pipa Medium B Galvanis DN 2" btg 270,000 350,000 panjang 6 m
Pipa Medium B Galvanis DN 90 ( 3" ) btg 420,000 490,000 panjang 6 m
Pipa Medium B Galvanis DN 110 ( 4" ) btg 560,000 580,000 panjang 6 m
Pipa Medium B Galvanis DN 160 ( 6" ) btg 960,000 1,050,000 panjang 6 m
Pipa Medium B Galvanis DN 200 ( 8" ) btg 1,850,000 2,100,000 panjang 6 m
Pipa Medium B Galvanis DN 250 ( 10") btg - - panjang 6 m

VIII . B A H A N L A N G I T - L A N G I T
1 AKUSTIK-uk : 30 X 30 lbr 5,500 5,800
30 X 60 lbr 13,000 13,200
60 X 120 lbr 41,000 42,000
List Kayu Profil m' 4,800 5,000
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 60,000 65,000
3 HARD BOARD-uk: 4'X 8' lbr 50,500 72,000
GYPROC uk.120cmx240cmx9mm lbr 57,500
4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 50,000 75,000
. 120 X 240 X 3 mm lbr 90,000 95,000
. 90 X 210 X 4 mm lbr 65,000 70,000
. 90 X 210 X 9 mm lbr 115,000 125,000
. 90 X 210 X 12 mm lbr 145,000 170,000
. 90 X 210 X 15 mm lbr 225,000 240,000
. 90 X 210 X 18 mm lbr 295,000 310,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
Tripleks
. 120 X 240 X 3 mm lbr 52,000 60,000
. 120 X 240 X 4 mm lbr 62,000 70,000
. 120 X 240 X 6 mm lbr 75,000 80,000
Multipleks
. 120 X 240 X 9 mm lbr 125,000 160,000
. 120 X 240 X 12 mm lbr 145,000 180,000
. 120 X 240 X 15 mm lbr 165,000 190,000
. 120 X 240 X 18 mm lbr 185,000 215,000
Formika ukuran pintu lbr 68,000 75,000

IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 25,000 30,000
Dempul plamur kg 25,000 30,000
Ambril/amplas lbr 3,800 4,100
Batu Apung kg 29,000 31,000
Cat dasar kg 34,000 36,500
. Emco kg 50,000 55,000
. Yunior 66 (nippon paint) kg 50,000 58,000
- Koas bh 7,500 8,000
. Deculux kg 55,000 58,000
. Siralax ons 10,000 18,000
. Spiritus ltr 11,000 13,500
. Plitur jadi ltr 35,000 42,000

2 TEMBOK
Kalkarium kg 4,200 5,000
Kapur sirih kg 4,250 4,750
Plamur kg 20,000 32,000
Cat Tembok kg 20,000 21,000
Sintex 5 kg 100,000 105,000
Danabride 5 kg 105,000 115,000
Catylac 5 kg 115,000 120,000 23,500
Mowilex 2,50 kg 300,000 350,000

3 BESI
Menie kg 20,000 30,000
Cat mengkilat kg 35,000 58,000
Cat kg 36,000 42,500
Thinner A ltr 15,000 16,000
Minyak cat ltr 13,000 20,000
Thinner Super ltr 12,000 25,000
Residu (teer/aspal) drum 55,000 60,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 1,025,000 1,200,000
kapasitas 1100 liter. bh 1,650,000 1,750,000
Lem Aica Aibon kg 55,000 65,500
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
X . BAHAN KACA
1 POLOS 3 mm m2 70,000 85,000
5 mm m2 90,000 95,000
2 ES KABUR 3 mm m2 75,000 85,000
5 mm m2 85,000 95,000
3 RAY BAND 3 mm m2 75,000 85,000
5 mm m2 85,000 92,000

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m' 3,100 3,300
SPLN LMK 1 X 2 1/2 mm2 m' 3,700 3,900
. 1X4 mm2 m' 5,700 6,000
1X6 mm2 m' 8,500 8,900
NYY :. 2 X 1 1/2 mm2 m' 9,000 9,450
PRIMA 2 X 2 1/2 mm2 m' 15,000 15,500
. 2X4 mm2 m' 27,000 28,000
2X6 mm2 m' 35,000 37,000
3 X 1 1/2 mm2 m' 13,200 14,000
3 X 2 1/2 mm2 m' 20,000 21,000
3X4 mm2 m' 34,500 36,500
3X6 mm2 m' 50,000 53,000
NYM :. 2 X 1 1/2 mm2 m' 7,000 8,000
PRIMA 2 X 2 1/2 mm2 m' 10,900 11,500
. 2X4 mm2 m' 21,000 23,000
3 X 1 1/2 mm2 m' 12,500 14,000
3 X 2 1/2 mm2 m' 19,000 22,000
3X4 mm2 m' 30,000 35,000
3X6 mm2 m' 43,000 48,000

2 SKAKELAR
Out bauw . Seri bh 15,000 21,000
. Engkel bh 12,000 15,000
In bauw . Seri bh 11,500 16,500
. Engkel bh 9,500 12,000

3 FUSE BOX (SEKERING KASA)


1 group bh 115,000 135,000
2 group bh 220,000 245,000
3 group bh 325,000 360,000

4 STEKER - Biasa bh 10,000 12,000


Arde bh 15,000 16,000
T Biasa bh 12,500 13,000
T dengan Arde bh 17,000 17,500
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
5 FITING Flaon bh 7,500 11,000
Gantung bh 10,000 20,000
Kap bh 5,000 17,500
Kombinasi bh 275,000 350,000

6 STOP KONTAK - Arde Outbow putih bh 12,500 15,000


Arde Outbow hitam bh 5,000 6,000
Arde IB bh 10,000 15,000
Arde Putar bh 31,000 42,000

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG


1 KUNCI TANAM Union : 1 X slag bh 55,000 60,000
2 X slag bh 65,000 70,000
Yale : 1 X slag bh 85,000 95,000
2 X slag bh 140,000 155,000
Kuda : 1 X slag bh 55,000 60,000
2 X slag bh 70,000 75,000

2 ENGSEL DAN GERENDEL


Engsel Angin bh 15,000 16,000
Kupu-kupu biasa bh 4,000 4,500
Nylon kupu-kupu bh 6,000 9,000
Espagnoled - dalam negeri bh 30,000 50,000
Grendel Tanam luar negeri bh 7,500 11,000
Grendel biasa bh 10,000 20,000
Kait Angin bh 5,000 17,500
Door Stop bh 275,000 350,000

XIII . BAHAN SANITAIR


1 KLOSET DUDUK bh 1,250,000 1,450,000
2 KLOSET JONGKOK bh 140,000 155,000
3 WASTAFEL PEDESTAL bh 250,000 1,250,000
4 WASTAFEL MEJA OVAL bh 350,000 950,000
5 WASTAFEL GANTUNG BULAT bh 275,000 450,000 362500
6 WASTAFEL GANTUNG SUDUT bh 240,000 310,000
7 WASTAFEL GANTUNG SUDUT KECIL bh 150,000 275,000
8 WASTAFEL BAK CUCI bh 145,000 160,000
9 TEMPAT SABUN GANTUNG bh 30,000 35,000
10 TEMPAT SABUN TANAM bh 20,000 25,000

11 SEPTIC TANK (ETERNIT GRESIK)


5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit - -
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
12 LAIN - LAIN
Kran Air bh 15,000 35,000
Seal tape bh 3,000 4,100
Floor drain bh 15,000 20,000

XIV . ALAT PENGIKAT KAYU


1 PAKU - ukuran 1" s/d 4" kg 12,000 14,000
2 PAKU - payung kg 20,000 30,000
3 PAKU - sekrup kg 6,000 8,000
4 PAKU - beton kg 25,000 30,000
5 MUR BAUT (kuda-kuda) kg 13,000 14,000
6 ANGKUR BAUT bh 13,000 13,500
7 LEM KAYU bh 18,000 20,000
8 Tali Ijuk kg 6,500 7,000

XV . POMPA AIR.
1 POMPA AIR TANGAN
Dragon buatan Indonesia bh 275,000 310,000
2 POMPA AIR LISTRIK
Sanyo 100 watt bh 975,000 1,050,000
Fuji 250 watt bh 1,450,000 1,500,000
Shimizu . 100 watt bh 450,000 510,000
. 90 watt bh 350,000 380,000
Dab . 125 watt bh 350,000 400,000
. 175 watt bh 425,000 450,000

X VI . PAVING BLOCK
1 SQUARE Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
2 HOLLAND Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
3 UNIDECOR Abu-abu m2 42,000 55,000
Merah/hitam m2 52,500 62,000
4 UNI Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
5 TRIHEX Abu-abu m2 50,000 55,000
Merah/hitam m2 52,500 62,000
6 OLYMPIA HEXA Abu-abu m2 50,000 55,000
7 HEXAGONAL Abu-abu m2 52,500 62,000
Merah/hitam m2 50,000 55,000
8 CASTLE Abu-abu m2 52,500 62,000
9 TRAPEZ Abu-abu m2 50,000 55,000
10 TRAPEZ GRASS BLOCK
Abu-abu m2 50,000 55,000
11 STANDARD GRASS BLOCK ABU-ABU BH 7,500 8,500
12 BATACO BH 3,000 3,800
13 KANSTEEN m' 15,000 27,000
HARGA
NO. J E N I S B A H A N SAT MINIMUM MAKSIMUM KET
(Rp) (Rp)
XVII. L A I N - L A I N
1 KREI 25 MM m2 45,000 50,000
2 Sliding Pintu J4 bh 180,000 235,000
3 Naco per Daun bh 12,000 12,500
4 Rolling door Besi m2 300,000 325,000
Rolling door Almunium m2 230,000 275,000
5 Awning Almunium m2 210,000 225,000
6 Kusen Almunium 4" Putih m' 80,000 85,000
7 WIDE FLANGE BEAM
150 X 75 X 5 X 7 X 12 btg 1,050,000 1,100,000

8 ASPAL.
Aspal Ex Pertamina isi Net 160 kg drum 1,650,000 1,700,000

Hotmix Tebal = 4 Cm m2 65,000 70,000


Hotmix Tebal = 5 Cm m2 80,000 85,000
Hotmix Tebal = 6 Cm m2 95,000 100,000
Hotmix Tebal = 7 Cm m2 110,000 120,000
Binder Course ton 1,300,000 1,350,000
Wearing Course ton 1,300,000 1,450,000
Hot Roller Sheet ton 1,150,000 1,300,000
Sand Sheet ton 1,100,000 1,250,000
Sand Sheet Emulsi ton 1,450,000 1,600,000
Cold Mix ton 1,750,000 1,850,000
Prime / Tack Coard RC liter 8,200 8,700
Prime Coat MC liter 8,200 8,700
Prime / Tack Coat Emulsi liter 8,200 8,700
10 K A C A
Cermin tebal 5 mm m2 225,000 275,000

11 PAGAR BRC. Pagar BRC 90 A2 /lb 175,000 200,000


Pagar BRC 120 A2 /lb 225,000 250,000
12 LAIN-LAIN
Minyak Beton & bekisting ltr 9,000 10,000
Pintu Lipat Besi m2 380,000 425,000
Sunscreen Allumunim m2 310,000 350,000
Allumunium Foil m2 7,500 8,000
Soda api kg 12,000 13,000
Sabun kg 11,000 13,000
Air m3 12,500 15,000
Koas Alang-alang ikat 1,250 2,000
Solar (Industri) ltr 7,000 7,200
Premium (Industri) ltr 6,200 6,800
Pelumas ltr 37,500 45,000
Vynil 30x30 cm bh 6,200 6,500
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
Overhead & Profit (contah 10%)
2 A.2.2.1.4 1 m' Pengukuran dan Pemasangan Bouwplank
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.012 m3 Kayu 5/7x 4m Kayu Kruing
0.02 Kg Paku Biasa 2" - 5"
0.007 m3 Kayu Papan 3/20 Kruing
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)
1 A.2.3.1.1 1 m3 Menggali Tanah Biasa Sedalam 1 m
A TENAGA
L.01 0.75 OH Pekerja
L.04 0.025 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)

9 A.2.3.1.9 1 m3 Pengurugan Kembali


Pengurugan Kembali di hitung dari 1/3 kali koefisien Pekerjaan galian
A TENAGA
L.01 0.50 OH Pekerja
L.04 0.050 OH Mandor
B BAHAN
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)

11 A.2.3.1.11 1 m3 Urugan Pasir


A TENAGA
L.01 0.30 OH Pekerja
L.04 0.01 OH Mandor
B BAHAN
1.2 m3 Pasir Urug
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contah 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/13 abk 2-14


III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI
1 A.3.2.1.1 1 m3 Pemasangan Pondasi Batu Belah 1SP : 3 PP
A TENAGA
L.01 1.5 OH Pekerja
L.02 0.750 OH Tukang Batu
L.03 0.075 OH Kepala Tukang
L.04 0.075 OH Mandor
B BAHAN
1.2 m3 Batu Belah 15/20
202 Kg Portland Sement
0.485 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/14 abk 3-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


16 A.4.4.1.20 1 m2 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP
A Tenaga
L.01 0.300 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.015 OH Mandor
B Bahan
12.500 buah Batako
15.160 kg PC
0.364 m3 Pasir Pasang
0.280 kg Besi Angkur 8 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/15 abk 4-14


V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
13 A,4,4,2.13 1 m2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 20 mm
A Tenaga
L.01 0.40 OH Pekerja
L.02 0.20 OH Tukang batu
L.03 0.020 OH Kepala Tukang
L.04 0.022 OH Mandor
B Bahan
13.632 kg Portland Semen
0.027 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

25 A,4,4,2.27 1 m2 Pemasangan Acian


Tenaga
L.01 0.20 OH Pekerja
L.02 0.10 OH Tukang batu
L.03 0.010 OH Kepala Tukang
L.04 0.010 OH Mandor
Bahan
3.25 Kg Portland Semen
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

105750

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/16 abk 5-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

VI A.4.6.1 HARGA SATUAN PEKERJAAN K A Y U


1 A.4.6.1.1 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas I
A Tenaga
L.01 7 OH Pekerja
L.02 21 OH Tukang Kayu
L.03 2.10 OH Kepala Tukang
L.04 0.35 OH Mandor
B Bahan
1.1 m3 Kayu Klas I (Jati) , Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

2 A.4.6.1.2 1 m3 Pembuatan & Pemasangan Kosen Pintu & Jendela Kayu klas II atau III
Tenaga
L.01 6.00 OH Pekerja
L.02 18.00 OH Tukang Kayu
L.03 1.80 OH Kepala Tukang
L.04 0.30 OH Mandor
Bahan
1.2 m3 Kayu Klas II (Kamfer) , Balok
1.25 kg Paku Biasa 2" - 5 "
1 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

3 A.4.6.1.3 1 m2 Pembuatan & Pemasangan Pintu KlampStandard Kayu Klas II (Kayu Kamfer)
A Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
0.040 m3 Kayu Klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

4 A.4.6.1.4 1 m2 Pembuatan & Pemasangan Daun Pintu Klamp Sederhana Kayu Klas III
Tenaga
L.01 0.35 OH Pekerja
L.02 1.05 OH Tukang Kayu
L.03 0.105 OH Kepala Tukang
L.04 0.018 OH Mandor
Bahan
0.040 m3 Kayu Klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5 "
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

5 A.4.6.1.5 1 m2 Pembuatan & Pemasangan Daun Pintu Panel, Kayu Klas I atau II
A Tenaga
L.01 1.00 OH Pekerja
L.02 3.00 OH Tukang Kayu
L.03 0.30 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.04 m3 Kayu Klas II (Kamfer), papan
0.050 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/17 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

6 A.4.6.1.6 1 m2 Pembuatan & Pemasangan Pintu & Jendela Kaca Kayu Klas I atau II
A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.024 m3 Kayu Klas II (Kamfer), papan
0.300 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

7 A.4.6.1.7 1 m2 Pembuatan & Pemasangan Pintu & Jendela Jalusi Kayu Klas I atau II (jati)
A Tenaga
L.01 1 OH Pekerja
L.02 3 OH Tukang Kayu
L.03 0.3 OH Kepala Tukang
L.04 0.05 OH Mandor
B Bahan
0.064 m3 Kayu Klas I (Jati), papan
0.5 kg Lem Kayu
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

8 A.4.6.1.8 1 m2 Pembuatan&Pemasangan Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
A Tenaga
L.01 0.700 OH Pekerja
L.02 2.100 OH Tukang Kayu
L.03 0.210 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Kamfer), papan
0.030 Kg Paku Biasa 1/2" - 1"
0.500 Ltr Lem Kayu
1.000 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

9 A.4.6.1.9 1 m2 Pembuatan&Pemasangan Pintu Plywood rangkap, rangka expose kayu klas I atau II
A Tenaga
L.01 0.800 OH Pekerja
L.02 2.400 OH Tukang Kayu
L.03 0.240 OH Kepala Tukang
L.04 0.040 OH Mandor
B Bahan
0.0256 m3 Kayu Klas II (Kamfer), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.5 Ltr Lem Kayu
1 Lbr Plywood tebal 4 mm uk.90x220cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

10 A.4.6.1.10 1 m2 Pembuatan & Pemasangan Jalusi mati Kosen Kayu Klas I atau II
A Tenaga
L.01 0.670 OH Pekerja
L.02 2.000 OH Tukang Kayu
L.03 0.200 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
0.06 m3 Kayu Klas I (Jati), papan
0.15 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/18 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

11 A.4.6.1.11 1 m2 Pembuatan & Pemasangan Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
A Tenaga
L.01 0.80 OH Pekerja
L.02 2.40 OH Tukang Kayu
L.03 0.24 OH Kepala Tukang
L.04 0.04 OH Mandor
B Bahan
0.025 m3 Kayu Klas I (Jati), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.3 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

12 A.4.6.1.12 1 m2 Pembuatan&Pemasangan Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
A Tenaga
L.01 0.850 OH Pekerja
L.02 2.550 OH Tukang Kayu
L.03 0.255 OH Kepala Tukang
L.04 0.043 OH Mandor
B Bahan
0.025 m3 Kayu Klas II (Kamfer), papan
0.03 Kg Paku Biasa 1/2" - 1"
0.08 kg Lem Kayu
1 Lbr Teakwood (90 x 220) cm x 4 mm
0.5 Lbr Formika
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

13 A.4.6.1.13 1 m3 Pembuatan&Memasang Konstruksi Kuda-kuda Konvensional Kayu I; II & III Bentang 6 meter
A Tenaga
L.01 4 OH Pekerja
L.02 12 OH Tukang Kayu
L.03 1.2 OH Kepala Tukang
L.04 0.2 OH Mandor
B Bahan
1.1 m3 Kayu Kamfer, balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

14 A.4.6.1.14 1 m3 Pembuatan&Pemasangan Konstruksi Kuda-kuda Expose, Kayu Klas I


A Tenaga
L.01 6.7 OH Pekerja
L.02 20.1 OH Tukang Kayu
L.03 2.01 OH Kepala Tukang
L.04 0.335 OH Mandor
B Bahan
1.2 m3 Kayu Klas I (jati), balok
15 Kg Besi Strip
5.6 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

15 A.4.6.1.15 1 m3 Pemasangan konstruksi Gording, Kayu Klas II


A Tenaga
L.01 2.4 OH Pekerja
L.02 7.2 OH Tukang Kayu
L.03 0.72 OH Kepala Tukang
L.04 0.12 OH Mandor
B Bahan
1.1 m3 Kayu Klas I (Kamfer), balok
15 Kg Besi Strip
3 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/19 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/20 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

16 A.4.6.1.16 1 m2 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0036 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

17 A.4.6.1.17 1 m2 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), Kaso-kaso (5x7) cm
0.0072 m3 Reng (2x3) cm
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

18 A.4.6.1.18 1 m2 Pemasangan Rangka Atap Sirap, Kayu Klas II


A Tenaga
L.01 0.12 OH Pekerja
L.02 0.12 OH Tukang Kayu
L.03 0.012 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
0.014 m3 Kayu Klas II (Kamfer), balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

19 A.4.6.1.19 1 m2 Pemasangan Rangka Langit-langit (50x1,00) m, kayu Klas II atau III


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.30 OH Tukang Kayu
L.03 0.030 OH Kepala Tukang
L.04 0.075 OH Mandor
B Bahan
0.0154 m3 Kayu Klas II (Kamfer), balok
0.2 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

20 A.4.6.1.20 1 m2 Pemasangan Rangka Langit-langit (60x60) cm, kayu Klas II atau III
A Tenaga
L.01 0.2 OH Pekerja
L.02 0.3 OH Tukang Kayu
L.03 0.03 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
0.0163 m3 Kayu Klas II (Kamfer), balok
0.25 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/21 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

21 A.4.6.1.21 1 m' Pemasangan Listplank Uk. (3x20)cm Kayu klas I atau II


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.020 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.0108 m3 Kayu klas I (Jati), papan
0.10 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

22 A.4.6.1.22 1 m' Pemasangan Listplank Uk. (3x30)cm Kayu klas I atau klas II
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.2 OH Tukang Kayu
L.03 0.02 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.011 m3 Kayu klas II (Kamfer), papan
0.05 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

23 A.4.6.1.23 1 m2 Pemasangan Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III
A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

24 A.4.6.1.24 1 m2 Pemasangan Dinding Pemisah Teakwood Rangkap Rangka Kayu Klas II


A Tenaga
L.01 0.15 OH Pekerja
L.02 0.45 OH Tukang Kayu
L.03 0.045 OH Kepala Tukang
L.04 0.008 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Teakwood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

25 A.4.6.1.25 1 m2 Pemasangan Dinding Pemisah Plywood Rangkap Rangka Kayu Klas II


A Tenaga
L.01 0.020 OH Pekerja
L.02 0.600 OH Tukang Kayu
L.03 0.060 OH Kepala Tukang
L.04 0.010 OH Mandor
B Bahan
0.028 m3 Kayu klas II (Kamfer), balok
0.15 Kg Paku Biasa 2" - 5"
0.86 Lbr Plywood 120 x 240 cm tebal 4mm
0.56 Ltr Lem
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/22 abk 6-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

26 A.4.6.1.26 1 m2 Pemasangan Dinding Lambriziring dari Papan klas I


A Tenaga
L.01 0.6 OH Pekerja
L.02 1.8 OH Tukang Kayu
L.03 0.18 OH Kepala Tukang
L.04 0.03 OH Mandor
B Bahan
0.007 m3 Kayu klas I (Jati), papan
0.1 Kg Paku Biasa 2" - 5"
0.15 Kg Paku Sekrup 3,5"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

27 A.4.6.1.27 1 m2 Pemasangan Dinding Lambriziring dari Plywood ukuran (120x240) cm


A Tenaga
L.01 0.025 OH Pekerja
L.02 0.075 OH Tukang Kayu
L.03 0.0080 OH Kepala Tukang
L.04 0.0010 OH Mandor
B Bahan
0.4 Lbr Plywood (120 X 240) cm x 4mm
0.05 Kg Paku Biasa 1/2" - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

28 A.4.6.1.28 1 m2 Pemasangan Dinding Bilik, Rangka Kayu Klas III atau IV


A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.500 m2 Bilik Bambu
0.014 m3 Kayu Klas III (Meranti)
0.012 Kg Paku Biasa 1/2" - 1"
0.003 m' List Kayu 2/4
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/23 abk 6-14


VII A.4.1.1 HARGA SATUAN PEKERJAAN BETON
1 A.4.1.1.1 1 m3 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87
A Tenaga
L.01 1.65 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
247 Kg Portland Semen
869 Kg Pasir Beton
999 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)
Overhead & Profit (contoh 10%) 10%

5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
A Tenaga
L.01 1.65 OH Pekerja
L.02 0.275 OH Tukang Batu
L.03 0.028 OH Kepala Tukang
L.04 0.083 OH Mandor
B Bahan
326 Kg Portland Semen
760 Kg Pasir Beton
1,029 Kg Kerikil (maksimum 30 mm)
215 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/24 abk 7-14


13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir
A Tenaga
L.01 0.07 OH Pekerja
L.02 0.07 OH Tukang Besi
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
10.50 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

17 A.4.1.1.21 1 m2 Memasang Bekisting untuk Sloof


A Tenaga
L.01 0.52 OH Pekerja
L.02 0.26 OH Tukang Kayu
L.03 0.026 OH Kepala Tukang
L.04 0.026 OH Mandor
B Bahan
0.045 m3 Kayu Klas III (Terentang)
0.3 Kg Paku Biasa 2" - 5"
0.1 Ltr Minyak Bekisting
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

18 A.4.1.1.22 1 m2 Memasang Bekisting untuk Kolom


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Klas II
0.35 Lbr Plywood tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

19 A.4.1.1.23 1 m2 Memasang Bekisting untuk Balok


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.018 m3 Balok Kayu Klas II
0.35 Lbr Plywood tebal 9mm
2 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

20 A.4.1.1.24 1 m2 Memasang Bekisting untuk Lantai


A Tenaga
L.01 0.66 OH Pekerja
L.02 0.33 OH Tukang Kayu
L.03 0.033 OH Kepala Tukang
L.04 0.033 OH Mandor
B Bahan
0.04 m3 Kayu Klas III (Terentang)
0.4 Kg Paku Biasa 2" - 5"
0.2 Ltr Minyak Bekisting
0.015 m3 Balok Kayu Klas II (Borneo)
0.35 Lbr Plywood tebal 9mm
6 Btg Dolken Kayu Galam diameter 8 - 10 cm / 4 m
C PERALATAN
D Jumlah A + B + C
file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/25 abk 7-14
E Overhead & Profit (contoh 10%) 10%
VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
12 A.4.5.2.32 1 m2 Pemasangan Atap Genteng Metal
A Tenaga
L.01 0.2 OH Pekerja
L.02 0.1 OH Tukang Kayu
L.03 0.01 OH Kepala Tukang
L.04 0.01 OH Mandor
B Bahan
1.02 m2 Genteng Metal
0.20 Kg Paku Biasa " - 1"
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10% 10%

F Harga Satuan Pekerjaan (D+E)

15 A.4.5.2.36 1 m' Pemasangan Nok Genteng Metal


A Tenaga
L.01 0.250 OH Pekerja
L.02 0.150 OH Tukang Kayu
L.03 0.015 OH Kepala Tukang
L.04 0.013 OH Mandor
B Bahan
1.1 Buah Nok Genteng
0.05 Kg Paku Biasa 1/2" - 1"

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10% 10%

F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/26 abk 8-14


IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT
7 A.4.5.1.7 1 m2 #REF!
A Tenaga
L.01 0.1 OH Pekerja
L.02 0.05 OH Tukang Kayu
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.364 Lbr Gypsum Board
0.11 Kg Paku Sekrup
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

8 A.4.5.1.9 1 m2 Memasang Langit-langit Akuatik Uk (60x120) cm & Rangka Allumuniu


A Tenaga
L.01 0.5 OH Pekerja
L.02 0.5 OH Tukang Kayu
L.03 0.05 OH Kepala Tukang
L.04 0.025 OH Mandor
B Bahan
3.6 m' Profil Allumunium "T"
0.15 kg Kawat 4 mm
1.05 bh Ramset
1.5 lmb Akuatik 60 x 120 cm
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

10 A.4.5.1.11 1 m2 #REF!
A Tenaga
L.01 0.10 OH Pekerja
L.02 0.05 OH Tukang Besi
L.03 0.005 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
0.42 m1 Rangka metal hollow 40.40
0.15 rang hollow 20.40
0.36 gypsum boad 120x240x9mm
0.11 paku gypsum
4.00 ramset/dinabolt
0.07 cotton plester
0.13 compoun
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/27 abk 9-14


X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
1 A.5.1.1.1 1 Unit Memasang Closet Duduk / Mono Blok
A Tenaga
L.01 3.3 OH Pekerja
L.02 1.1 OH Tukang Batu
L.03 0.001 OH Kepala Tukang
L.04 0.16 OH Mandor
Buah Bahan
1 Buah Kloset Duduk / Monoblok
0.06 Kelengkapan 6% dari harga Kloset
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)


Overhead & Profit (contoh 10%)
4 A.5.1.1.5 1 Unit Memasang Wastafel
A Tenaga
L.01 1.2 OH Pekerja
L.02 0.145 OH Tukang Batu
L.03 0.15 OH Kepala Tukang
L.04 0.1 OH Mandor
B Bahan
1 Buah Wastafel
0.3 - Perlengkapan 30% Harga Wastafel
6 Kg Portland Semen
0.01 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

9 A.5.1.1.14 1 buah Pemasangan Floor Drain


A Tenaga
L.01 0.010 OH Pekerja
L.02 0.100 OH Tukang Batu
L.03 0.010 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1 bh Floor Drain

C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

14 A.5.1.1.19 1 bh Pemasangan Kran " atau "


A Tenaga
L.01 0.010 OH Pekerja
L.02 0.400 OH Tukang Batu
L.03 0.040 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
1.00 bh Kran Air
0.0025 bh Sealtape
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

21 A.5.1.1.26 1 m' Pemasangan Pipa PVC tipe AW "


A Tenaga
L.01 0.036 OH Pekerja
L.02 0.060 OH Tukang Batu
L.03 0.006 OH Kepala Tukang
L.04 0.002 OH Mandor
B Bahan
1.20 m' Pipa PVC "
0.35 Ls Perlengkapan 35% x pipa
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/28 abk 10-14
F Harga Satuan Pekerjaan (D+E)
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


10 A.4.2.1.11 1 m' Pemasangan Kusen Pintu Allumunium
A Tenaga
L.01 0.043 OH Pekerja
L.02 0.043 OH Tukang Besi
L.03 0.0043 OH Kepala Tukang
L.04 0.0021 OH Mandor
B Bahan
1.1 m' Profil Allumunium
2 buah Skrup Fixer
0.06 Tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

11 A.4.2.1.12 1 m2 Pemasangan Pintu Allumunium Strip Lebar 8 cm


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.0085 OH Kepala Tukang
L.04 0.0042 OH Mandor
B Bahan
4.4 m' Profil Allumunium
14.6 m' Allumunium Strip
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

12 A.4.2.1.13 1 m2 Pemasangan Pintu Kaca Rangka Allumunium


A Tenaga
L.01 0.085 OH Pekerja
L.02 0.085 OH Tukang Besi
L.03 0.009 OH Kepala Tukang
L.04 0.005 OH Mandor
B Bahan
4.4 m' Pintu Allumunium
4.5 m' Profil Kaca
0.27 tube Sealant
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

13 A.4.2.1.14 1 m2 Pemasangan Venetions Blinds & Vertical Blinds


A Tenaga
L.01 0.35 OH Pekerja
L.02 0.35 OH Tukang Besi
L.03 0.035 OH Kepala Tukang
L.04 0.018 OH Mandor
B Bahan
1 m2 Venetions Blinds atau Vertical Blinds (tirai)
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

14 A.4.2.1.15 1 m2 Pemasangan Terali Besi Strip (2x3) cm


A Tenaga
L.01 1.67 OH Pekerja
L.02 1.67 OH Tukang Las
L.03 0.167 OH Kepala Tukang
file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/29 abk 11-14
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 1 Buah Pemasangan Kunci Tanam Biasa 197,202.50 219,477.50
A Tenaga 39,275.00 44,525.00
L.01 0.01 OH Pekerja 55,000.00 65,000.00 550.00 650.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.01 OH Kepala Tukang 85,000.00 95,000.00 850.00 950.00
L.04 0.005 OH Mandor 75,000.00 85,000.00 375.00 425.00
B Bahan 140,000.00 155,000.00
1 Buah Kunci Tanam Biasa 140,000.00 155,000.00 140,000.00 155,000.00
C PERALATAN
D Jumlah A + B + C 179,275.00 199,525.00
E Overhead & Profit (contoh 10%) 10% 17,927.50 19,952.50
F Harga Satuan Pekerjaan (D+E) 197,202.50 219,477.50
Overhead & Profit (contoh 10%)

2 A.4.6.2.3 1 Buah Pemasangan Kunci Kamar Mandi 135,726.25 152,363.75


A Tenaga 38,387.50 43,512.50
L.01 0.005 OH Pekerja 55,000.00 65,000.00 275.00 325.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.005 OH Kepala Tukang 85,000.00 95,000.00 425.00 475.00
L.04 0.0025 OH Mandor 75,000.00 85,000.00 187.50 212.50
B Bahan 85,000.00 95,000.00
1 Buah Kunci Tanam Kamar Mandi 85,000.00 95,000.00 85,000.00 95,000.00
C PERALATAN
D Jumlah A + B + C 123,387.50 138,512.50
E Overhead & Profit (contoh 10%) 10% 12,338.75 13,851.25
F Harga Satuan Pekerjaan (D+E) 135,726.25 152,363.75

3 A.4.6.2.4 1 Buah Pemasangan Kunci Selinder 196,226.25 218,363.75


A Tenaga 38,387.50 43,512.50
L.01 0.005 OH Pekerja 55,000.00 65,000.00 275.00 325.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.005 OH Kepala Tukang 85,000.00 95,000.00 425.00 475.00
L.04 0.0025 OH Mandor 75,000.00 85,000.00 187.50 212.50
B Bahan 140,000.00 155,000.00
1 Buah Kunci Selinder 140,000.00 155,000.00 140,000.00 155,000.00
C PERALATAN
D Jumlah A + B + C 178,387.50 198,512.50
E Overhead & Profit (contoh 10%) 10% 17,838.75 19,851.25
F Harga Satuan Pekerjaan (D+E) 196,226.25 218,363.75

4 A.4.6.2.5 1 Buah Pemasangan Engsel Pintu 21,903.75 27,266.25


A Tenaga 13,912.50 15,787.50
L.01 0.015 OH Pekerja 55,000.00 65,000.00 825.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 85,000.00 95,000.00 1,275.00 1,425.00
L.04 0.0075 OH Mandor 75,000.00 85,000.00 562.50 637.50
B Bahan 6,000.00 9,000.00
1 Buah Engsel pintu 6,000.00 9,000.00 6,000.00 9,000.00
C PERALATAN
D Jumlah A + B + C 19,912.50 24,787.50
E Overhead & Profit (contoh 10%) 10% 1,991.25 2,478.75
F Harga Satuan Pekerjaan (D+E) 21,903.75 27,266.25

5 A.4.6.2.6 1 Buah Pemasangan Engsel Jendela Kupu-kupu 14,602.50 16,527.50


A Tenaga 9,275.00 10,525.00
L.01 0.01 OH Pekerja 55,000.00 65,000.00 550.00 650.00
L.02 0.1 OH Tukang Kayu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 85,000.00 95,000.00 850.00 950.00
L.04 0.005 OH Mandor 75,000.00 85,000.00 375.00 425.00
B Bahan 4,000.00 4,500.00
1 Buah Engsel Jendela 4,000.00 4,500.00 4,000.00 4,500.00
C PERALATAN
D Jumlah A + B + C 13,275.00 15,025.00
E Overhead & Profit (contoh 10%) 10% 1,327.50 1,502.50
F Harga Satuan Pekerjaan (D+E) 14,602.50 16,527.50
file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/30 abk 12-14
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/31 abk 12-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
6 A.4.6.2.7 1 Buah Pemasangan Engsel Angin 40,961.25 45,586.75
A Tenaga 22,237.50 25,442.50
L.01 0.10 OH Pekerja 55,000.00 65,000.00 5,500.00 6,500.00
L.02 0.20 OH Tukang Kayu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.02 OH Kepala Tukang 85,000.00 95,000.00 1,700.00 1,900.00
L.04 0.0005 OH Mandor 75,000.00 85,000.00 37.50 42.50
B Bahan 15,000.00 16,000.00
1 Buah Engsel Angin 15,000.00 16,000.00 15,000.00 16,000.00
C PERALATAN
D Jumlah A + B + C 37,237.50 41,442.50
E Overhead & Profit (contoh 10%) 10% 3,723.75 4,144.25
F Harga Satuan Pekerjaan (D+E) 40,961.25 45,586.75

7 A.4.6.2.9 1 Buah Pemasangan Kait Angin 20,845.00 36,663.00


A Tenaga 13,950.00 15,830.00
L.01 0.015 OH Pekerja 55,000.00 65,000.00 825.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 85,000.00 95,000.00 1,275.00 1,425.00
L.04 0.008 OH Mandor 75,000.00 85,000.00 600.00 680.00
B Bahan 5,000.00 17,500.00
1 Buah Kait Angin 5,000.00 17,500.00 5,000.00 17,500.00
C PERALATAN
D Jumlah A + B + C 18,950.00 33,330.00
E Overhead & Profit (contoh 10%) 10% 1,895.00 3,333.00
F Harga Satuan Pekerjaan (D+E) 20,845.00 36,663.00

8 A.4.6.2.10 1 Buah Pasang Door Closer 351,656.25 440,783.75


A Tenaga 44,687.50 50,712.50
L.01 0.05 OH Pekerja 55,000.00 65,000.00 2,750.00 3,250.00
L.02 0.5 OH Tukang Kayu 75,000.00 85,000.00 37,500.00 42,500.00
L.03 0.05 OH Kepala Tukang 85,000.00 95,000.00 4,250.00 4,750.00
L.04 0.0025 OH Mandor 75,000.00 85,000.00 187.50 212.50
B Bahan 275,000.00 350,000.00
1 Buah Door Closer 275,000.00 350,000.00 275,000.00 350,000.00
C PERALATAN
D Jumlah A + B + C 319,687.50 400,712.50
E Overhead & Profit (contoh 10%) 10% 31,968.75 40,071.25
F Harga Satuan Pekerjaan (D+E) 351,656.25 440,783.75

9 A.4.6.2.11 1 Buah Pemasangan Kunci Selot 30,662.50 44,313.50


A Tenaga 17,875.00 20,285.00
L.01 0.02 OH Pekerja 55,000.00 65,000.00 1,100.00 1,300.00
L.02 0.2 OH Tukang Kayu 75,000.00 85,000.00 15,000.00 17,000.00
L.03 0.02 OH Kepala Tukang 85,000.00 95,000.00 1,700.00 1,900.00
L.04 0.001 OH Mandor 75,000.00 85,000.00 75.00 85.00
B Bahan 10,000.00 20,000.00
1 Buah Kunci Selot 10,000.00 20,000.00 10,000.00 20,000.00
C PERALATAN
D Jumlah A + B + C 27,875.00 40,285.00
E Overhead & Profit (contoh 10%) 10% 2,787.50 4,028.50
F Harga Satuan Pekerjaan (D+E) 30,662.50 44,313.50

10 A.4.6.2.13 1 Buah Pemasangan Door Stop 312,331.25 396,156.75


A Tenaga 8,937.50 10,142.50
L.01 0.01 OH Pekerja 55,000.00 65,000.00 550.00 650.00
L.02 0.1 OH Tukang Kayu 75,000.00 85,000.00 7,500.00 8,500.00
L.03 0.01 OH Kepala Tukang 85,000.00 95,000.00 850.00 950.00
L.04 0.0005 OH Mandor 75,000.00 85,000.00 37.50 42.50
B Bahan 275,000.00 350,000.00
1 Buah Door Stop 275,000.00 350,000.00 275,000.00 350,000.00
C PERALATAN
D Jumlah A + B + C 283,937.50 360,142.50
E Overhead & Profit (contoh 10%) 10% 28,393.75 36,014.25
F Harga Satuan Pekerjaan (D+E) 312,331.25 396,156.75

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/32 abk 12-14


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN MINIMUM MAKSIMUM MINIMUM MAKSIMUM
Rp Rp Rp Rp
11 A.4.6.2.14 1 Buah Pemasangan Rel Pintu Dorong 256,987.50 325,440.50
A Tenaga 53,625.00 60,855.00
L.01 0.06 OH Pekerja 55,000.00 65,000.00 3,300.00 3,900.00
L.02 0.6 OH Tukang Kayu 75,000.00 85,000.00 45,000.00 51,000.00
L.03 0.06 OH Kepala Tukang 85,000.00 95,000.00 5,100.00 5,700.00
L.04 0.003 OH Mandor 75,000.00 85,000.00 225.00 255.00
B Bahan 180,000.00 235,000.00
1 Buah Rel Pintu Dorong 180,000.00 235,000.00 180,000.00 235,000.00
C PERALATAN
D Jumlah A + B + C 233,625.00 295,855.00
E Overhead & Profit (contoh 10%) 10% 23,362.50 29,585.50
F Harga Satuan Pekerjaan (D+E) 256,987.50 325,440.50

12 A.4.6.2.15 1 Buah Pemasangan Kunci Lemari 30,082.25 36,146.55


A Tenaga 22,347.50 25,360.50
L.01 0.025 OH Pekerja 55,000.00 65,000.00 1,375.00 1,625.00
L.02 0.25 OH Tukang Kayu 75,000.00 85,000.00 18,750.00 21,250.00
L.03 0.025 OH Kepala Tukang 85,000.00 95,000.00 2,125.00 2,375.00
L.04 0.00130 OH Mandor 75,000.00 85,000.00 97.50 110.50
B Bahan 5,000.00 7,500.00
1 Buah Kunci Lemari 5,000.00 7,500.00 5,000.00 7,500.00
C PERALATAN
D Jumlah A + B + C 27,347.50 32,860.50
E Overhead & Profit (contoh 10%) 10% 2,734.75 3,286.05
F Harga Satuan Pekerjaan (D+E) 30,082.25 36,146.55

13 A.4.6.2.16 1 m2 Pemasangan Kaca tebal 3 mm 99,446.88 119,585.13


A Tenaga 13,406.25 15,213.75
L.01 0.015 OH Pekerja 55,000.00 65,000.00 825.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 85,000.00 95,000.00 1,275.00 1,425.00
L.04 0.00075 OH Mandor 75,000.00 85,000.00 56.25 63.75
B Bahan 77,000.00 93,500.00
1.1 m2 Kaca tebal 3mm 70,000.00 85,000.00 77,000.00 93,500.00
C PERALATAN
D Jumlah A + B + C 90,406.25 108,713.75
E Overhead & Profit (contoh 10%) 10% 9,040.63 10,871.38
F Harga Satuan Pekerjaan (D+E) 99,446.88 119,585.13

14 A.4.6.2.17 1 m2 Pemasangan Kaca tebal 5 mm 123,646.88 131,685.13


A Tenaga 13,406.25 15,213.75
L.01 0.015 OH Pekerja 55,000.00 65,000.00 825.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 85,000.00 95,000.00 1,275.00 1,425.00
L.04 0.00075 OH Mandor 75,000.00 85,000.00 56.25 63.75
B Bahan 99,000.00 104,500.00
1.1 m2 Kaca tebal 5mm 90,000.00 95,000.00 99,000.00 104,500.00
C PERALATAN
D Jumlah A + B + C 112,406.25 119,713.75
E Overhead & Profit (contoh 10%) 10% 11,240.63 11,971.38
F Harga Satuan Pekerjaan (D+E) 123,646.88 131,685.13

15 A.4.6.2.18 1 m2 Pemasangan Kaca Cermin tebal 5 mm 286,996.88 349,485.13


A Tenaga 13,406.25 15,213.75
L.01 0.015 OH Pekerja 55,000.00 65,000.00 825.00 975.00
L.02 0.15 OH Tukang Kayu 75,000.00 85,000.00 11,250.00 12,750.00
L.03 0.015 OH Kepala Tukang 85,000.00 95,000.00 1,275.00 1,425.00
L.04 0.00075 OH Mandor 75,000.00 85,000.00 56.25 63.75
B Bahan 247,500.00 302,500.00
1.1 m2 Kaca Cermin 225,000.00 275,000.00 247,500.00 302,500.00
C PERALATAN
D Jumlah A + B + C 260,906.25 317,713.75
E Overhead & Profit (contoh 10%) 10% 26,090.63 31,771.38
F Harga Satuan Pekerjaan (D+E) 286,996.88 349,485.13

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/33 abk 12-14


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


No. SNI KODE KOEF SAT. URAIAN PEKERJAAN

5 A.4.4.3.9 1 m2 Pemasangan keramik lantai Uk. 40 x 40 cm


A Tenaga
L.01 0.250 OH Pekerja
L.02 0.125 OH Tukang Batu
L.03 0.013 OH Kepala Tukang
L.04 0.013 OH Mandor
B Bahan
6.00 Buah Ubin Granito 40x40 cm Gol D
9.8 Kg Portland Semen
1.300 Kg Semen warna
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

12 A.4.4.3.36 1 m2 Pemasangan Lantai Keramik 20 x 20 cm


A Tenaga
L.01 0.70 OH Pekerja
L.02 0.35 OH Tukang Batu
L.03 0.035 OH Kepala Tukang
L.04 0.035 OH Mandor
B Bahan
26.5 Buah Ubin Keramik 20 x 20 cm
10.40 Kg Portland Semen
1.62 Kg Semen Warna
0.045 m3 Pasir Pasang
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

23 A.4.4.3.54 1 m2 Pemasangan Dinding Keramik 20x20 cm,


A Tenaga
L.01 0.9 OH Pekerja
L.02 0.45 OH Tukang Batu
L.03 0.045 OH Kepala Tukang
L.04 0.045 OH Mandor
B Bahan
26.5 Buah Keramik
9.3 Kg Portland Semen
0.018 m3 Pasir Pasang
1.94 Kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

24 A.4.4.3.55 1 m2 Pemasangan Dinding Marmer Ukuran 1.00x1.00 cm


A Tenaga
L.01 1.3 OH Pekerja
L.02 0.65 OH Tukang Batu
L.03 0.065 OH Kepala Tukang
L.04 0.065 OH Mandor
B Bahan
1.06 buah Marmer
3.003 buah Paku 12 cm
12.44 kg Portlan Semen
0.025 m3 Pasir Pasang
0.65 kg Semen Warna
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

25 A.4.4.3.58 1 m2 Pemasangan Dinding Batu Paros / Batu Tempel Hitam


XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN

10 A.4.7.1.10 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar


2 lap. Cat Penutup)
A Tenaga
L.01 0.02 OH Pekerja
L.02 0.063 OH Tukang Cat
L.03 0.0063 OH Kepala Tukang
L.04 0.0030 OH Mandor
B Bahan
0.1 Kg Plamir
0.1 Kg Cat Dasar
0.26 Kg Cat Penutup 2 kali
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%

F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/36 abk 14-14


REKAPITULASI :
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN B IAYA

I. - PEKERJAAN PERSIAPAN 14,925,880.00


II. - PEKERJAAN TANAH 2,591,457.00
III. PEKERJAAN BETON 54,396,729.88
IV. - PEKERJAAN BEARING PAD 1,520,000.00
V - PEKERJAAN STRUKTUR TALANG BAJA 323,010,740.00
VI - PEKERJAAN JEMBATAN ATAS TALANG 2,884,232.00
VII - PEKERJAAN TRASHRACK 350,000.00
VIII - PEKERJAAN LAIN - LAIN 5,500,000.00

JUMLAH = 405,179,038.88
PPN 10 % = 40,517,903.89
JUMLAH = 445,696,942.77
JUMLAH ( Dibulatkan ) = 445,696,000.00
RENCANA ANGGARAN BIAYA
PEKERJAAN :
LOKASI :
TAHUN ANGGARAN :

NO. URAIAN PEKERJAAN VOLUME SAT. ANALISA HARGA SAT. JUMLAH HARGA
I PEKERJAAN PERSIAPAN
I.1 Pengukuran dan Bouwplank 20.00 m' 96,294.00 1,925,880.00
I.2 Pembersihan Lokasi Awal 1.00 Ls 5,000,000.00 5,000,000.00
I.3 Mobilisasi personel dan alat 1.00 Ls 7,500,000.00 7,500,000.00
I.4 Pemasangan Papan proyek 1.00 Ls 500,000.00 500,000.00
SUBTOTAL 14,925,880.00
II PEKERJAAN TANAH
II.1 Pekerjaan Galian Struktur Abutment 7.80 m3 84,975.00 662,805.00
II.2 Urugan Pasir di bawah foot Abutment t = 10 cm 1.20 m3 223,410.00 268,092.00
II.3 Pemasangan Trucuk Bambu 48.00 Btg 34,595.00 1,660,560.00
SUBTOTAL 2,591,457.00
III PEKERJAAN BETON
III.1 Pekerjaan Beton Lantai kerja k-175 10.40 m3 1,197,293.74 12,451,854.87
III.2 Pekerjaan Beton Abutment K-225 7.80 m3 1,266,624.75 9,879,673.06
III.3 Pemasangan bekisting abutment 36.00 m2 416,680.00 15,000,480.00
III.4 Pemasangan bekisting lantai kerja 52.00 m2 322,586.00 16,774,472.00
III.5 Pekerjaan Pembesian Abutment 12 7.80 m3 15,947.80 124,392.84
III.6 Pekerjaan Pembesian lantai kerja 12 10.40 m3 15,947.80 165,857.12
SUBTOTAL 54,396,729.88
IV PEKERJAAN BEARING PAD
IV.1 Pemasangan Bearing pad 4.00 bh taksir 380,000.00 1,520,000.00
SUB TOTAL 1,520,000.00
V PEKERJAAN STRUKTUR TALANG BAJA
V.1 Pekerjaan bantalan talang Profil C 150x50x20x3,2 13.00 bh taksir 354,500.00 4,608,500.00
V.2 Pekerjaan Alas Dan Dinding Talang 78.00 m2 taksir 3,430,500.00 267,579,000.00
V.3 Pekerjaan Pengikat Dinding menggunakan baja siku 13.00 bh taksir 45,480.00 591,240.00
V.4 Pekerjaan Plat Bordes 8mm 26.00 m2 taksir 1,932,000.00 50,232,000.00
SUBTOTAL 323,010,740.00
VI PEKERJAAN JEMBATAN ATAS TALANG
VI.1 Pemasangan railing baja Profil L 52.00 m' taksir 31,819.00 1,654,588.00
VI.2 Pekerjaan pengecatan hand railing 52.00 m' 23,647.00 1,229,644.00
SUB TOTAL 2,884,232.00
VII PEKERJAAN TRASHRACK
VII.1 Pemasangan trashrack 1.00 bh taksir 350,000.00 350,000.00
SUB TOTAL 350,000.00
VIII PEKERJAAN LAIN - LAIN
VIII.1 Pembersian akhir 1.00 Ls 2,500,000.00 2,500,000.00
VIII.2 P3K 1.00 Ls 3,000,000.00 3,000,000.00
SUB TOTAL 5,500,000.00
JADWAL PELAKSANAAN PEKERJAAN
NAMA PAKET / PEKERJAAN :
KABUPATEN - KOTA :
KONTRAKTOR :
KONSULTAN :
TAHUN ANGGARAN : 2016

JANGKA WAKTU PELAKSANAAN 180 ( DU


BOBOT BULAN KE I
(%) 1 2 3
NO. URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN

PEKERJAAN TANAH

PEKERJAAN BETON

PEKERJAAN BEARING PAD

PEKERJAAN BEARING PAD

PEKERJAAN STRUKTUR TALANG BAJA

PEKERJAAN JEMBATAN ATAS TALANG

PEKERJAAN JEMBATAN ATAS TALANG

PEKERJAAN TRASHRACK

PEKERJAAN LAIN - LAIN

Jumlah Bobot Seluruh Pekerjaan


Rencana Pekerjaan Per Minggu ( % )
Rencana Pekerjaan Komulatif Per Minggu ( % )
Realisasi Pekerjaan Per Minggu ( % )
Realisasi Pekerjaan Komulatif Per Minggu ( % )
Deviasi ( % )
U PELAKSANAAN 180 ( DUA RATUS EMPAT PULUH ) HARI KALENDER
BULAN KE II BULAN KE III BULAN KE IV
4 5 6 7 8 9 10 11 12 13 14
N KE IV BULAN KE V BULAN KE VI KET.
15 16 17 18 19 20 21 22 23 24
DAF TAR H AR G A S AT U AN P E K E R J AAN
S U MB E R DATA PASARAN B E BAS
D A E R A H KOTA SEMARANG & SEKITAR

NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN PEKERJAAN

I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN


2 A.2.2.1.4 Pengukuran dan Pemasangan Bouwplank m' 143,368.50

II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH


1 A.2.3.1.1 Menggali Tanah Biasa Sedalam 1 m m3 51,700.00
9 A.2.3.1.9 Pengurugan Kembali m3 1/3 x Gal.tanah
10 A.2.3.1.10 Pemadatan Tanah (per 20 cm) m3 37,400.00
11 A.2.3.1.11 Urugan Pasir m3 304,480.00
14 A.2.3.1.14 Mengurug Sirtu Padat m3 196,900.00

III A.3.2.1. HARGA SATUAN PEKERJAAN PONDASI


1 A.3.2.1.1 Pemasangan Pondasi Batu Belah 1SP : 3 PP m3 968,385.00
9 A.3.2.1.9 Pemasang Batu Kosong/Anstamping m3 558,261.00

IV A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING


16 A.4.4.1.20 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 3PP m2 225,897.65
17 A.4.4.1.21 Pemasangan Dinding HB/CB 10, speci camp. 1SP : 4PP m2 230,339.04

V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN


1 A,4,4,2.1 Pemasangan Plesteran 1 Pc : 1 Pp Tebal 15 mm m2 61,174.74
2 A,4,4,2.2 Pemasangan Plesteran 1 Pc : 2 Pp Tebal 15 mm m2 55,808.94
3 A,4,4,2.3 Pemasangan Plesteran 1 Pc : 3 Pp Tebal 15 mm m2 53,718.06
25 A,4,4,2.27 Pemasangan Acian m2 28,025.94

VII A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N


1 A.4.1.1.1 Membuat Beton mutu f'c=7,4 Mpa (K100), slum (122)cm, w/c = 0,87 m3 1,024,229.84
2 A.4.1.1.2 Membuat Beton mutu f'c=9,8 Mpa (K125), slum (122)cm, w/c = 0,78 m3 1,053,419.49
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (122)cm, w/c = 0,72 m3 1,075,948.17
4 A.4.1.1.4 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 m3 925,000.00
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66 m3 1,102,852.12
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61 m3 1,128,288.17
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 m3 1,147,944.92
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56 m3 1,160,347.35
13 A.4.1.1.17 Pembesian dg Besi Polos atau Besi Ulir 10 kg 116,331.88
14 A.4.1.1.18 Kabel Presstresed Polos/strand 10 kg 151,472.75
15 A.4.1.1.19 Jaring Kawat baja/Wire Mesh 10 kg 299,424.13
16 A.4.1.1.20 Memasang Bekisting untuk Pondasi m2 157,597.00
17 A.4.1.1.21 Memasang Bekisting untuk Sloof m2 168,872.00
18 A.4.1.1.22 Memasang Bekisting untuk Kolom m2 375,193.50
19 A.4.1.1.23 Memasang Bekisting untuk Balok m2 394,003.50
20 A.4.1.1.24 Memasang Bekisting untuk Lantai m2 474,193.50
21 A.4.1.1.25 Memasang Bekisting untuk Dinding m2 431,843.50
22 A.4.1.1.26 Memasang Bekisting untuk Tangga m2 352,121.00

VIII A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP


12 A.4.5.2.32 Pemasangan Atap Genteng Metal m2 88,440.00
15 A.4.5.2.36 Pemasangan Nok Genteng Metal m' 58,756.50
16 A.4.5.2.37 Pemasangan Nok Sirap m' 47,256.00
17 A.4.5.2.38 Pemasangan Atap Seng Gelombang m2 36,360.50
18 A.4.5.2.39 Pemasangan Atap Nok Seng m' 27,175.50
19 A.4.5.2.42 Pasang Allumunium Foil / Sisalation m2 24,450.25

IX A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT


7 A.4.5.1.7 Memasang Langit-langit Gypsu Board, Uk (120x240) tebal 9 mm m2 38,805.25

X A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG


1 A.5.1.1.1 Memasang Closet Duduk / Mono Blok Unit 1,902,879.00
2 A.5.1.1.2 Memasang Closet Jongkok Porselen Unit 533,967.50
3 A.5.1.1.4 Memasang Urinoir Unit 702,212.50
4 A.5.1.1.5 Memasang Wastafel Unit 645,122.50
8 A.5.1.1.12 Pemasangan Bak Cuci Piring Stainless stell buah 354,420.00
9 A.5.1.1.14 Pemasangan Floor Drain buah 30,140.00
10 A.5.1.1.15 Pemasangan Bak Kontrol Pas.Batu Bata 30x30 tinggi 35 cm bh 381,282.00
11 A.5.1.1.16 Pemasangan Bak Kontrol Pas.Batu Bata 45 x 45 tinggi 50 cm bh 564,236.75
12 A.5.1.1.17 Pemasangan Bak Kontrol Pas.Batu Bata 60x60 tinggi 60 cm bh 689,207.75
20 A.5.1.1.25 Pemasangan Pipa PVC tipe AW " m' 20,787.25
NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN PEKERJAAN

21 A.5.1.1.26 Pemasangan Pipa PVC tipe AW " m' 23,344.75


NO. KODE URAIAN PEKERJAAN SAT HARGA SATUAN PEKERJAAN

22 A.5.1.1.27 Pemasangan Pipa PVC tipe AW 1" m' 25,902.25


23 A.5.1.1.28 Pemasangan Pipa PVC tipe AW 1" m' 30,825.67
24 A.5.1.1.29 Pemasangan Pipa PVC tipe AW 2" m' 41,055.67
25 A.5.1.1.31 Pemasangan Pipa PVC tipe AW 3" m' 62,320.96
26 A.5.1.1.32 Pemasangan Pipa PVC tipe AW 4" m' 86,571.83

XI A.4.2.1 HARGA SATUAN PEKERJAAN BESI & ALLUMUNIUM


10 A.4.2.1.11 Pemasangan Kusen Pintu Allumunium m' 112,392.50
11 A.4.2.1.12 Pemasangan Pintu Allumunium Strip Lebar 8 cm m2 489,886.10
12 A.4.2.1.13 Pemasangan Pintu Kaca Rangka Allumunium m2 457,281.00
17 A.4.2.1.18 Pemasangan Talang Datar/Jurai , Seng BJLS 28 Lebar 90 cm m' 182,278.25
18 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran 15 cm, Seng Plaat BJLS 30 Lebar 45 cm m' 73,708.25
19 A.4.2.1.20 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x120 cm dinding partisi m2 #REF!
20 A.4.2.1.21 Pemasangan Rangka Besi Hollow 1 x 40.40.2mm; Modul 60x60 cm dinding plafond m2 #REF!

XII A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI dan KACA


1 A.4.6.2.2 Pemasangan Kunci Tanam Biasa Buah 208,340.00
2 A.4.6.2.3 Pemasangan Kunci Kamar Mandi Buah 144,045.00
3 A.4.6.2.4 Pemasangan Kunci Selinder Buah 207,295.00
4 A.4.6.2.5 Pemasangan Engsel Pintu Buah 24,585.00
5 A.4.6.2.6 Pemasangan Engsel Jendela Kupu-kupu Buah 15,565.00
6 A.4.6.2.7 Pemasangan Engsel Angin Buah 43,274.00
7 A.4.6.2.9 Pemasangan Kait Angin Buah 28,754.00
8 A.4.6.2.10 Pasang Door Closer Buah 396,220.00
9 A.4.6.2.11 Pemasangan Kunci Selot Buah 37,488.00
10 A.4.6.2.13 Pemasangan Door Stop Buah 354,244.00
11 A.4.6.2.14 Pemasangan Rel Pintu Dorong Buah 291,214.00
12 A.4.6.2.15 Pemasangan Kunci Lemari Buah 33,114.40
13 A.4.6.2.16 Pemasangan Kaca tebal 3 mm m2 109,516.00
14 A.4.6.2.17 Pemasangan Kaca tebal 5 mm m2 127,666.00
15 A.4.6.2.18 Pemasangan Kaca Cermin tebal 5 mm m2 318,241.00

XIII A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI dan DINDING


11 A.4.4.3.35a Pemasangan Lantai Keramik 40 x 40 cm m2 185,000.00
12 A.4.4.3.36 Pemasangan Lantai Keramik 20 x 20 cm m2 198,566.50
14 A.4.4.3.39a Pemasangan Plint Keramik Ukuran 10x40 cm m' 18,166.78
24 A.4.4.3.54 Pemasangan Dinding Keramik 20x25 cm, m2 211,586.38

XIV A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN


10 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar m2 17,500.00
HARGA BAHAN/UPAH HARGA
No. NOMOR KOEF SAT. URAIAN PAKERJAAN
Rp Rp
I HARGA SATUAN PEKERJAAN PERSIAPAN
2 24.01.01.02 m' Pengukuran dan Pemasangan Bouwplank
A Tenaga Rp 13,190.00
23.02.04.01.04.F 0.1 OH Pekerja Rp 9,900.00 Rp 990.00
23.02.04.01.03.F 0.1 OH Tukang Kayu Rp 105,000.00 Rp 10,500.00
23.02.04.01.02.F 0.01 OH Kepala Tukang Rp 110,000.00 Rp 1,100.00
23.02.04.01.01.F 0.005 OH Mandor Rp 120,000.00 Rp 600.00
B Bahan Rp 74,350.00
20.01.01.43.04.03.F 0.012 m3 Kayu 5/7x 4m Rp 4,500,000.00 Rp 54,000.00
20.01.01.28.04.05.F 0.02 doz Paku Biasa 2" - 5" Rp 27,000.00 Rp 540.00
20.01.01.43.04.05.F 0.007 m3 Kayu Bekisting Rp 2,830,000.00 Rp 19,810.00
C PERALATAN
D Jumlah A + B + C Rp 87,540.00
E Overhead & Profit (contah 10%) 10% Rp 8,754.00
F Harga Satuan Pekerjaan (D+E) Rp 96,294.00
HARGA BAHAN/UPAH HARGA
No. NOMOR KOEF SAT. URAIAN PAKERJAAN
Rp Rp
I HARGA SATUAN PEKERJAAN PERSIAPAN
m3 Penggalian Tanah biasa untuk Konstruksi
A Tenaga Rp 77,250.00
0.75 OH Pekerja Rp 99,000.00 Rp 74,250.00
0.025 OH Mandor Rp 120,000.00 Rp 3,000.00
B Bahan Rp -

C PERALATAN
D Jumlah A + B + C Rp 77,250.00
E Overhead & Profit (contah 10%) 10% Rp 7,725.00
F Harga Satuan Pekerjaan (D+E) Rp 84,975.00

m3 Pengurugan Pasir (PADAT)


A Tenaga Rp 30,900.00
0.3 OH Pekerja Rp 99,000.00 Rp 29,700.00
0.010 OH Mandor Rp 120,000.00 Rp 1,200.00
B Bahan Rp 172,200.00
1.2 m3 Pasir urug Rp 143,500.00 Rp 172,200.00
C PERALATAN
D Jumlah A + B + C Rp 203,100.00
E 0 10% Rp 20,310.00
F Harga Satuan Pekerjaan (D+E) Rp 223,410.00

m3 Pemasangan trucuk bambu f 10 s/d 12 -P.3m


A Tenaga Rp 9,450.00
0.05 OH Pekerja Rp 99,000.00 Rp 4,950.00
0.04 OH Tukang Rp 105,000.00 Rp 4,200.00
0.0025 OH Mandor Rp 120,000.00 Rp 300.00
B Bahan Rp 22,000.00
1.0 Btg Bambu bongkotan 10-12 cm , P 3m Rp 22,000.00 Rp 22,000.00
C PERALATAN
D Jumlah A + B + C Rp 31,450.00
E 0 10% Rp 3,145.00
F Harga Satuan Pekerjaan (D+E) Rp 34,595.00
HARGA BAHAN/UPAH HARGA
No. NOMOR KOEF SAT. URAIAN PAKERJAAN
Rp Rp
I HARGA SATUAN PEKERJAAN PERSIAPAN
2 24.01.01.01 m2 Pekerjaan Bekisting Lantai
A Tenaga Rp 22,040.00
23.02.04.01.04.F 0.1 OH Pekerja Rp 99,000.00 Rp 9,900.00
23.02.04.01.03.F 0.1 OH Tukang Kayu Rp 105,000.00 Rp 10,500.00
23.02.04.01.02.F 0.01 OH Kepala Tukang Rp 110,000.00 Rp 1,100.00
23.02.04.01.01.F 0.0045 OH Mandor Rp 120,000.00 Rp 540.00
B Bahan Rp 271,220.00
20.01.01.28.04.03.F 0.400 Kg Paku Triplek/Eternit Rp 22,000.00 Rp 8,800.00
20.01.01.34.02.F 0.35 Lbr Plywood Uk.122x249x9 mm Rp 93,600.00 Rp 32,760.00
20.01.01.43.03.07.F 0.015 m3 Kayu Kamper Balok 4/6 , 6/7 Rp 6,400,000.00 Rp 96,000.00
20.01.01.43.04.05.F 0.04 m3 Kayu meranti Bekisting Rp 3,200,000.00 Rp 128,000.00
20.01.02.01.08.F 0.200 ltr Minyak Bekistng Rp 28,300.00 Rp 5,660.00
C PERALATAN
D Jumlah A + B + C Rp 293,260.00
E Overhead & Profit (contah 10%) 10% Rp 29,326.00
F Harga Satuan Pekerjaan (D+E) Rp 322,586.00

2 24.01.01.01 m2 Pekerjaan Bekisting Kolom


A Tenaga Rp 107,580.00
23.02.04.01.04.F 0.66 OH Pekerja Rp 99,000.00 Rp 65,340.00
23.02.04.01.03.F 0.33 OH Tukang Kayu Rp 105,000.00 Rp 34,650.00
23.02.04.01.02.F 0.033 OH Kepala Tukang Rp 110,000.00 Rp 3,630.00
23.02.04.01.01.F 0.033 OH Mandor Rp 120,000.00 Rp 3,960.00
B Bahan Rp 271,220.00
20.01.01.28.04.03.F 0.400 Kg Paku Triplek/Eternit Rp 22,000.00 Rp 8,800.00
20.01.01.34.02.F 0.35 Lbr Plywood Uk.122x249x9 mm Rp 93,600.00 Rp 32,760.00
20.01.01.43.03.07.F 0.015 m3 Kayu Kamper Balok 4/6 , 6/7 Rp 6,400,000.00 Rp 96,000.00
20.01.01.43.04.05.F 0.04 m3 Kayu meranti Bekisting Rp 3,200,000.00 Rp 128,000.00
20.01.02.01.08.F 0.200 ltr Minyak Bekistng Rp 28,300.00 Rp 5,660.00
C PERALATAN
D Jumlah A + B + C Rp 378,800.00
E 0 10% Rp 37,880.00
F Harga Satuan Pekerjaan (D+E) Rp 416,680.00
HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
VII A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N
10%
Overhead & Profit (contoh 10%)
4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
A Tenaga
L.01 1.200 OH Pekerja
L.02 0.200 OH Tukang Batu
L.03 0.020 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
230 Kg Portland Semen
893 kg Pasir Beton
1,027 kg Kerikil (maksimum 30 mm)
200 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
A Tenaga 205,265.00
1.65 OH Pekerja 99,000.00 163,350.00
0.275 OH Tukang Batu 105,000.00 28,875.00
0.028 OH Kepala Tukang 110,000.00 3,080.00
0.083 OH Mandor 120,000.00 9,960.00
B Bahan 883,183.85
8.150 zak Portland Semen 63,000.00 513,450.00
0.481 m3 Pasir Beton 232,100.00 111,553.06
0.542 m3 Kerikil (maksimum 30 mm) 466,000.00 252,375.79
215 ltr Air 27.00 5,805.00
C PERALATAN
D Jumlah A + B + C 1,088,448.85
E Overhead & Profit (contoh 10%) 10% 108,844.89
F Harga Satuan Pekerjaan (D+E) 1,197,293.74

7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
A Tenaga 205,265.00
L.01 1.650 OH Pekerja 99,000.00 163,350.00
L.02 0.275 OH Tukang Batu 105,000.00 28,875.00
L.03 0.028 OH Kepala Tukang 110,000.00 3,080.00
L.04 0.083 OH Mandor 120,000.00 9,960.00
B Bahan 946,212.05
9.275 Kg Portland Semen 63,000.00 584,325.00
0.436 Kg Pasir Beton 232,100.00 101,253.63
0.547 Kg Kerikil (maksimum 30 mm) 466,000.00 254,828.42
215 ltr Air 27.00 5,805.00
C PERALATAN
D Jumlah A + B + C 1,151,477.05
E Overhead & Profit (contoh 10%) 10% 115,147.70
F Harga Satuan Pekerjaan (D+E) 1,266,624.75

8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
A Tenaga
L.01
L.02
L.03
L.04
B Bahan
zak Portland Semen
m3 Pasir Beton
m3 Kerikil (maksimum 30 mm)
ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/50 BETON (2)


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
L.01 0.07 OH Pekerja
L.02 0.07 OH Tukang Besi
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
10.50 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

14 A.4.1.1.18 10 Kg Kabel Presstresed Polos/strand


A Tenaga 1,553.00
L.01 0.007 OH Pekerja 99,000.00 693.00
L.02 0.007 OH Tukang Besi 105,000.00 735.00
L.03 0.0007 OH Kepala Tukang 110,000.00 77.00
L.04 0.0004 OH Mandor 120,000.00 48.00
B Bahan 12,945.00
1.050 Kg Besi presstred polos 12,000.00 12,600.00
0.015 Kg Kawat Beton 23,000.00 345.00
C PERALATAN
D Jumlah A + B + C 14,498.00
E Overhead & Profit (contoh 10%) 10% 1,449.80
F Harga Satuan Pekerjaan (D+E) 15,947.80

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/51 BETON (2)


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp
VII A.4.1.1 HARGA SATUAN PEKERJAAN B E T O N
10%
Overhead & Profit (contoh 10%)
4 A.4.1.1.4 1.00 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87
A Tenaga
L.01 1.200 OH Pekerja
L.02 0.200 OH Tukang Batu
L.03 0.020 OH Kepala Tukang
L.04 0.006 OH Mandor
B Bahan
230 Kg Portland Semen
893 kg Pasir Beton
1,027 kg Kerikil (maksimum 30 mm)
200 ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

5 A.4.1.1.5 1 m3 Membuat Beton mutu f'c=14,5 MPa (K175), slum (122)cm, w/c = 0,66
A Tenaga 205,265.00
1.65 OH Pekerja 99,000.00 163,350.00
0.275 OH Tukang Batu 105,000.00 28,875.00
0.028 OH Kepala Tukang 110,000.00 3,080.00
0.083 OH Mandor 120,000.00 9,960.00
B Bahan 883,183.85
8.150 zak Portland Semen 63,000.00 513,450.00
0.481 m3 Pasir Beton 232,100.00 111,553.06
0.542 m3 Kerikil (maksimum 30 mm) 466,000.00 252,375.79
215 ltr Air 27.00 5,805.00
C PERALATAN
D Jumlah A + B + C 1,088,448.85
E Overhead & Profit (contoh 10%) 10% 108,844.89
F Harga Satuan Pekerjaan (D+E) 1,197,293.74

7 A.4.1.1.7 1 m3 Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58
A Tenaga 205,265.00
L.01 1.650 OH Pekerja 99,000.00 163,350.00
L.02 0.275 OH Tukang Batu 105,000.00 28,875.00
L.03 0.028 OH Kepala Tukang 110,000.00 3,080.00
L.04 0.083 OH Mandor 120,000.00 9,960.00
B Bahan 946,212.05
9.275 Kg Portland Semen 63,000.00 584,325.00
0.436 Kg Pasir Beton 232,100.00 101,253.63
0.547 Kg Kerikil (maksimum 30 mm) 466,000.00 254,828.42
215 ltr Air 27.00 5,805.00
C PERALATAN
D Jumlah A + B + C 1,151,477.05
E Overhead & Profit (contoh 10%) 10% 115,147.70
F Harga Satuan Pekerjaan (D+E) 1,266,624.75

8 A.4.1.1.8 1 m3 Membuat Beton mutu f'c=21,7 MPa (K250), slum (122)cm, w/c = 0,56
A Tenaga
L.01
L.02
L.03
L.04
B Bahan
zak Portland Semen
m3 Pasir Beton
m3 Kerikil (maksimum 30 mm)
ltr Air
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/52 BETON


HARGA BAHAN/UPAH JUMLAH
No. SNI KODE KOEF SAT. URAIAN PEKERJAAN
Rp Rp

13 A.4.1.1.17 10 Kg Pembesian dg Besi Polos atau Besi Ulir


A Tenaga
L.01 0.07 OH Pekerja
L.02 0.07 OH Tukang Besi
L.03 0.007 OH Kepala Tukang
L.04 0.004 OH Mandor
B Bahan
10.50 Kg Besi Beton (polos/ulir)
0.150 Kg Kawat Beton
C PERALATAN
D Jumlah A + B + C
E Overhead & Profit (contoh 10%) 10%
F Harga Satuan Pekerjaan (D+E)

14 A.4.1.1.18 10 Kg Kabel Presstresed Polos/strand


A Tenaga 1,553.00
L.01 0.007 OH Pekerja 99,000.00 693.00
L.02 0.007 OH Tukang Besi 105,000.00 735.00
L.03 0.0007 OH Kepala Tukang 110,000.00 77.00
L.04 0.0004 OH Mandor 120,000.00 48.00
B Bahan 12,945.00
1.050 Kg Besi presstred polos 12,000.00 12,600.00
0.015 Kg Kawat Beton 23,000.00 345.00
C PERALATAN
D Jumlah A + B + C 14,498.00
E Overhead & Profit (contoh 10%) 10% 1,449.80
F Harga Satuan Pekerjaan (D+E) 15,947.80

file:///var/www/apps/conversion/tmp/scratch_4/345293844.xls 65/53 BETON


DAFTAR HARGA SATUAN BAHAN BANG UNAN

SUMBER DATA :
D A E R A H :

NO. J E N I S B A H A N SAT HARGA

I BAHAN DASAR
1 BATU KALI Bulat Utuh m3 210,000
Bulat Belah m3 295,000
Pecah 10/15 m3 275,000
Pecah 5/7 m3 325,000
Pecah 3/5 m3 345,000
2 KERIKIL Timbun m3 135,000
Sawur / Koral m3 150,000
Beton 0,5/1 m3 360,000
Beton ,1/2 m3 385,000
Beton ,2/3 m3 380,000
Biasa m3 250,000
Tras Giling m3 305,000
3 BATU BATA ex lokal bh 625

4 PASIR Urug m3 215,000


Pasang m3 315,000
Beton m3 370,000
5 TANAH Padas m3 112,500
Liat m3 115,000
6 KAPUR Pasang m3 330,000
Semen Merah m3 180,000
7 PORTLAND CEMENT
Merk I 40 kg zak 46,500
Merk I 50 kg zak 59,500
Merk II 40 kg zak 46,000
Merk II 50 kg zak 59,000
Semen Putih 40 kg zak 83,750
Semen Putih 50 kg zak 92,500
Semen warna kg 13,000

II BAHAN P E N U T U P ATAP

1 SIRAP (100 lbr) pak 187,500

2 GENTENG BETON Genteng Beton Warna standard bh 6,500


Genteng Beton Warna Special bh 10,000
Genteng Beton Warna Khusus bh 14,600
Kerpus Beton Warna Standard bh 9,250
Kerpus Beton Warna Special bh 11,750
Kerpus Beton Warna Khusus bh 13,250
NO. J E N I S B A H A N SAT HARGA

3 GENTENG TANAH LIAT


Vlaam/Plentong bh 2,350
Kodok bh 3,050

Kodok Glasur bh 4,125


Nok kerpus Kodok bh 6,650
Nok kerpus Kodok Glasur bh 8,250
Plentong super besar 18 bh/m2 bh 5,225
Nok kerpus plentong super bh 9,100
4 GENTENG KACA
Vlaam tebal 2 mm bh 11,500
Vlaam tebal 3 mm bh 14,250
Kodok tebal 2 mm bh 11,250
Kodok tebal 3 mm bh 15,250

5 ASBES GELOMBANG BESAR


. 200 cm X 102 cm X 5 mm bh 88,000
. 225 cm X 102 cm X 5 mm bh 98,500
. 250 cm X 102 cm X 5 mm bh 106,000
. 200 cm X 102 cm X 6 mm bh 93,500
. 225 cm X 102 cm X 6 mm bh 97,500
. 250 cm X 102 cm X 6 mm bh 107,500
Asbes Gelombang Kecil
. 150 cm X 105 cm X 4 mm bh 43,500
. 180 cm X 105 cm X 4 mm bh 51,250
. 210 cm X 105 cm X 4 mm bh 59,500
. 240 cm X 105 cm X 4 mm bh 66,500
. 270 cm X 105 cm X 4 mm bh 76,250
. 300 cm X 105 cm X 4 mm bh 82,500
ONDULINE : 95 cm x 200cm x 0.3mm lbr 150,000

ONDUVILLA : 40cm x 106 cm x 0,3mm lbr 85,000


NOK Jabes nok
. Kerpus Genteng bh 35,500
. Stel Besar bh 47,500
. Paten Besar bh 45,000
Nokstel gelombang harflex
. Stel Besar bh 46,000
. Patent Besar bh 28,750
. Plat besar bh 53,000

NOK UNT ONDULINE & ONDUVILLA

Ukuran 50cm x 50 cm x 0,3mm lbr 107,500

6 ASBES PLAT

. 100cm X 100 cm X 3 mm bh 15,750


. 100cm X 100 cm X 4 mm bh 21,500

. 50 cm X 200 cm X 3 mm bh 14,500
. 40 cm X 200 cm X 3 mm bh 13,500
NO. J E N I S B A H A N SAT HARGA

FIBER PLAT uk. 100cm x 100cm x 4mm lbr 27,500

unt Plafond uk. 120cm x 240cm x 4mm lbr 70,750

uk. 122cm x 244cm x 4mm lbr 72,500

GRC BOARD uk.122cm x 244cm x 5mm lbr 104,000

uk.122cm x 244cm x 6mm lbr 128,500

uk.122cm x 244cm x 8mm lbr 188,500

uk.122cm x 244cm x 10mm lbr 252,500

7 FIBRE GLASS (JABES)


180 X 92 cm bh 55,000
200 X 92 cm bh 61,250
250 X 92 cm bh 69,750
180 X 105 cm bh 79,000
210 X 105 cm bh 87,500
250 X 105 cm bh 100,000

8 SENG PLAT
BJLS 0,18 lebar 55 cm m' 23,250
BJLS 0,20 lebar 55 cm m' 25,750
BJLS 0,28 lebar 55 cm m' 28,250
BJLS 0,30 lebar 55 cm m' 32,500

9 SENG GELOMBANG
BJLS 0,18 panjang 180 cm lbr 42,500
BJLS 0,20 panjang 180 cm lbr 48,250
BJLS 0,30 panjang 180 cm lbr 59,500
BJLS 0,40 panjang 180 cm lbr 72,000

III . B A H A N K A Y U

1 JATI Papan m3 22,500,000


Balok/pesagen m3 20,250,000

2 KAMPER Papan m3 7,700,000


Balok/pesagen m3 7,200,000

3 KRUING Papan m3 6,625,000


Balok/pesagen m3 5,700,000

4 MERANTI Papan m3 4,950,000


Balok/pesagen m3 4,550,000

5 LANAN Papan m3 2,675,000


Balok/pesagen m3 2,050,000

6 BENGKIRAI Papan m3 11,000,000


Balok/pesagen m3 9,612,500

7 DOLKEN Sedang 8 x 10 x 400 cm bt 22,500


Kecil 6 x 7 x 400 cm bt 19,500
Besar 10 x 12 x 400 cm bt 32,500
Kayu cetakan m3 2,450,000
Kayu bakar m3 160,000
Bambu bt 11,000
NO. J E N I S B A H A N SAT HARGA

IV . BAHAN PENUTUP DINDING / LANTAI

1 UBIN (TEGEL BIASA)


PC polos 30 X 30 cm m2 35,000
20 X 20 cm m2 33,000
PC warna 30 X 30 cm m2 45,500
20 X 20 cm m2 41,000
Teraso 30 X 30 cm m2 54,000

2 TEGEL PLINT -

PC warna 10 X 20 cm bh 5,350
PC abu-abu 15 x 20 bh 5,550

3 POLIS UBIN Lantai/badan m'


Plint m'
Trap m'

4 UBIN PORSELIN
Lokal 11 X 11 putih dos 42,500
11 X 11 warna dos 45,500
Lokal 15 X 15 putih dos 46,250
15 X 15 warna dos 47,500

5 MOZAIK PORSELIN
10 X 20 cm m2 52,500
15 X 15 cm m2 53,000
20 X 20 cm m2 56,000
20 X 25 cm m2 54,000

6 Keramik 30 X 30 cm m2 54,500
20 X 20 cm m2 54,000
33 x 33 cm m2 56,000
20 x 25 cm m2 53,000
15 x 20 cm m2 54,500
40 x 40 cm m2 58,000

7 Parquet Jati m2 260,000

8 Batu Paros m2 112,500

9 Batu Tempel Hitam m2 110,000

10 GRANITO 40 x 40 cm m2 235,000
30 x 30 cm m2 310,000

11 Marmer m2 477,500

V.BAHAN CETAK

1 BUIS BETON 10 cm - 100 cm bh 34,000

20 cm - 100 cm bh 46,250

30 cm - 100 cm bh 67,000

50 cm - 100 cm bh 122,500

60 cm - 100 cm bh 187,500

70 cm - 100 cm bh 245,000
NO. J E N I S B A H A N SAT HARGA

U 10 cm - 100 cm bh 22,250

U 15 cm - 100 cm bh 35,250

U 20 cm - 100 cm bh 42,000

U 30 cm - 100 cm bh 50,000

U 50 cm - 100 cm bh

2 LUBANG ANGIN (ROSTER) PC + PASIR


10 X 20 cm bh 6,550
20 X 20 cm bh 7,150
25 X 25 cm bh 7,650
30 X 30 cm bh 8,100
15 X 25 cm bh 7,850

15 X 30 cm bh 8,000

VI . B A H A N B E S I

1 BESI BETON besi beton polos kg 8,850


besi beton prestress kg 12,250
besi beton ulir kg 11,250

2 BESI PLAT Besi Strip kg 12,250

3 BESI PROFIL Besi Profil kg 12,650


a BAJA RINGAN

GALVALUME lebar : 7,5cm tebal : 1mm btg 62,500

type CT 75 lebar : 7,5cm tebal : 0.75mm btg 42,500

lebar : 7,5cm tebal : 0,65mm btg 40,000

b type RT 12 tinggi : 3,5 cm, tebal : 0,45mm btg 22,500


type RT 10 tinggi : 3,0 cm, tebal : 0,45mm btg 20,000

c HOLLOW GALVANIS LIPAT

tinggi 2 cm; tebal : 0,3mm btg 20,000

tinggi 4 cm; tebal : 0,3 mm btg 27,000

4 JARING - JARING BAJA


Diameter 4 - 15 kg 12,350
Diameter 6 - 15 kg 13,250

Kawat Bronjong kg 9,750

5 BESI SIKU L 40 X 40 X 4 btg 97,000

L 50 X 50 X 5 btg 150,000

L 60 X 60 X 6 btg 215,000

6 KAWAT - Ikat beton/bendrat kg 13,875


- Harmonika 12 X 45 mm m2 20,250
- Harmonika 12 X 24 mm m2 20,500
- Harmonika 14 X 30 mm m2 22,000
- Harmonika 14 X 35 mm m2 20,000

- Kawat Nyamuk Nylon m2 10,750

- Kawat Kasa m2 19,000


- Saringan pasir m2 17,500
- Kawat loket m2 18,750
- Kawat duri rol 122,500
- Kawat bronjong kg 26,250
NO. J E N I S B A H A N SAT HARGA

VII . B A H A N P I P A

1 Pipa PVC SII SCJ , S - 12,5 (10 bar)


Pipa PVC DN 20 ( " ) AW JIS btg 29,000
Pipa PVC DN 25 ( " ) AW JIS btg 35,000
Pipa PVC DN 32 ( 1" ) AW JIS btg 41,000
Pipa PVC DN 40 ( 1" ) btg 64,000
Pipa PVC DN 63 ( 2" ) btg 100,000
Pipa PVC DN 90 ( 3" ) btg 152,750
Pipa PVC DN 110 ( 4" ) btg 275,000
Pipa PVC DN 160 ( 6" ) btg 540,000
Pipa PVC DN 200 ( 8" ) btg 975,000
Pipa PVC DN 250 ( 10" ) btg
Pipa PVC DN 315 ( 12" ) btg

2 Pipa Medium B Galvanis - SII


Pipa Medium B Galvanis DN " btg 95,000
Pipa Medium B Galvanis DN 25 ( " ) btg 132,500
Pipa Medium B Galvanis DN 32 ( 1" ) btg 157,500
Pipa Medium B Galvanis DN 50 ( 1" ) btg 195,000
Pipa Medium B Galvanis DN 63 ( 2" ) btg 257,500
Pipa Medium B Galvanis DN 2" btg 310,000
Pipa Medium B Galvanis DN 90 ( 3" ) btg 455,000
Pipa Medium B Galvanis DN 110 ( 4" ) btg 570,000
Pipa Medium B Galvanis DN 160 ( 6" ) btg 1,005,000
Pipa Medium B Galvanis DN 200 ( 8" ) btg 1,975,000
Pipa Medium B Galvanis DN 250 ( 10") btg

VIII . B A H A N L A N G I T - L A N G I T

1 AKUSTIK-uk : 30 X 30 lbr 5,650


30 X 60 lbr 13,100
60 X 120 lbr 41,500
List Kayu Profil m' 4,900

2 SOFT BOARD-uk: 4'X 8' -


Gypsum tebal 9 mm lbr 62,500

3 HARD BOARD-uk: 4'X 8' lbr 61,250

GYPROC uk.120cmx240cmx9mm lbr 28,750

4 PLY WOOD
Teak wood
90 X 210 X 3 mm lbr 62,500
. 120 X 240 X 3 mm lbr 92,500
. 90 X 210 X 4 mm lbr 67,500
. 90 X 210 X 9 mm lbr 120,000
. 90 X 210 X 12 mm lbr 157,500
. 90 X 210 X 15 mm lbr 232,500
. 90 X 210 X 18 mm lbr 302,500
NO. J E N I S B A H A N SAT HARGA

Tripleks
. 120 X 240 X 3 mm lbr 56,000
. 120 X 240 X 4 mm lbr 66,000
. 120 X 240 X 6 mm lbr 77,500
Multipleks
. 120 X 240 X 9 mm lbr 142,500
. 120 X 240 X 12 mm lbr 162,500
. 120 X 240 X 15 mm lbr 177,500
. 120 X 240 X 18 mm lbr 200,000
Formika ukuran pintu lbr 71,500

IX . B A H A N F I N I S H I N G

1 KAYU
Menie kg 27,500
Dempul plamur kg 27,500
Ambril/amplas lbr 3,950
Batu Apung kg 30,000
Cat dasar kg 35,250
. Emco kg 52,500
. Yunior 66 (nippon paint) kg 54,000

- Koas bh 7,750
. Deculux kg 56,500
. Siralax ons 14,000
. Spiritus ltr 12,250
. Plitur jadi ltr 38,500

2 TEMBOK
Kalkarium kg 4,600
Kapur sirih kg 4,500
Plamur kg 26,000
Cat Tembok kg 20,500
Sintex 5 kg 102,500
Danabride 5 kg 110,000
Catylac 5 kg 117,500

Mowilex 2,50 kg 325,000

3 BESI
Menie kg 25,000
Cat mengkilat kg 46,500
Cat kg 39,250
Thinner A ltr 15,500
Minyak cat ltr 16,500
Thinner Super ltr 18,500
Residu (teer/aspal) drum 57,500
Fibre glass (tanki air)
kapasitas 550 liter. bh 1,112,500
kapasitas 1100 liter. bh 1,700,000
Lem Aica Aibon kg 60,250
NO. J E N I S B A H A N SAT HARGA

X.BAHAN KACA

1 POLOS 3 mm m2 77,500
5 mm m2 92,500

2 ES KABUR 3 mm m2 80,000
5 mm m2 90,000

3 RAY BAND 3 mm m2 80,000


5 mm m2 88,500

XI . BAHAN INSTALASI LISTRIK

1 KABEL LISTRIK
NYA : . 1 X 1 1/2 mm2 m' 3,200
SPLN LMK 1 X 2 1/2 mm2 m' 3,800
. 1X4 mm2 m' 5,850
1X6 mm2 m' 8,700
NYY :. 2 X 1 1/2 mm2 m' 9,225
PRIMA 2 X 2 1/2 mm2 m' 15,250
. 2X4 mm2 m' 27,500
2X6 mm2 m' 36,000
3 X 1 1/2 mm2 m' 13,600
3 X 2 1/2 mm2 m' 20,500
3X4 mm2 m' 35,500
3X6 mm2 m' 51,500
NYM :. 2 X 1 1/2 mm2 m' 7,500
PRIMA 2 X 2 1/2 mm2 m' 11,200
. 2X4 mm2 m' 22,000
3 X 1 1/2 mm2 m' 13,250
3 X 2 1/2 mm2 m' 20,500
3X4 mm2 m' 32,500
3X6 mm2 m' 45,500

2 SKAKELAR
Out bauw . Seri bh 18,000
. Engkel bh 13,500
In bauw . Seri bh 14,000
. Engkel bh 10,750

3 FUSE BOX (SEKERING KASA)


1 group bh 125,000
2 group bh 232,500
3 group bh 342,500

4 STEKER - Biasa bh 11,000


Arde bh 15,500
T Biasa bh 12,750
T dengan Arde bh 17,250
NO. J E N I S B A H A N SAT HARGA

5 FITING Flaon bh 9,250


Gantung bh 15,000
Kap bh 11,250
Kombinasi bh 312,500

6 STOP KONTAK - Arde Outbow putih bh 13,750


Arde Outbow hitam bh 5,500
Arde IB bh 12,500
Arde Putar bh 36,500

XII . ALAT - ALAT PENGUNCI & PENGGANTUNG

1 KUNCI TANAM Union : 1 X slag bh 57,500

2 X slag bh 67,500
Yale : 1 X slag bh 90,000

2 X slag bh 147,500
Kuda : 1 X slag bh 57,500

2 X slag bh 72,500

2 ENGSEL DAN GERENDEL

Engsel Angin bh 15,500


Kupu-kupu biasa bh 4,250
Nylon kupu-kupu bh 7,500
Espagnoled - dalam negeri bh 40,000
Grendel Tanam luar negeri bh 9,250
Grendel biasa bh 15,000
Kait Angin bh 11,250
Door Stop bh 312,500

XIII . BAHAN SANITAIR

1 KLOSET DUDUK bh 1,350,000

2 KLOSET JONGKOK bh 147,500

3 WASTAFEL PEDESTAL bh 750,000

4 WASTAFEL MEJA OVAL bh 650,000

5 WASTAFEL GANTUNG BULAT bh 362,500

6 WASTAFEL GANTUNG SUDUT bh 275,000

7 WASTAFEL GANTUNG SUDUT KECIL bh 212,500

8 WASTAFEL BAK CUCI bh 152,500

9 TEMPAT SABUN GANTUNG bh 32,500

10 TEMPAT SABUN TANAM bh 22,500

11 SEPTIC TANK (ETERNIT GRESIK)


5 Pemakai 500 liter unit
10 Pemakai 1.000 liter unit
NO. J E N I S B A H A N SAT HARGA

12 LAIN - LAIN

Kran Air bh 25,000

Seal tape bh 3,550

Floor drain bh 17,500


-

XIV . ALAT PENGIKAT KAYU -

1 PAKU - ukuran 1" s/d 4" kg 13,000

2 PAKU - payung kg 25,000

3 PAKU - sekrup kg 7,000

4 PAKU - beton kg 27,500

5 MUR BAUT (kuda-kuda) kg 13,500

6 ANGKUR BAUT bh 13,250

7 LEM KAYU bh 19,000

8 Tali Ijuk kg 6,750

XV . POMPA AIR.

1 POMPA AIR TANGAN


Dragon buatan Indonesia bh 292,500

2 POMPA AIR LISTRIK


Sanyo 100 watt bh 1,012,500
Fuji 250 watt bh 1,475,000
Shimizu . 100 watt bh 480,000
. 90 watt bh 365,000
Dab . 125 watt bh 375,000
. 175 watt bh 437,500
-

X VI . PAVING BLOCK -

1 SQUARE Abu-abu m2 52,500


Merah/hitam m2 57,250

2 HOLLAND Abu-abu m2 52,500


Merah/hitam m2 57,250

3 UNIDECOR Abu-abu m2 48,500


Merah/hitam m2 57,250

4 UNI Abu-abu m2 52,500


Merah/hitam m2 57,250

5 TRIHEX Abu-abu m2 52,500


Merah/hitam m2 57,250

6 OLYMPIA HEXA Abu-abu m2 52,500

7 HEXAGONAL Abu-abu m2 57,250


Merah/hitam m2 52,500

8 CASTLE Abu-abu m2 57,250

9 TRAPEZ Abu-abu m2 52,500

10 TRAPEZ GRASS BLOCK -


Abu-abu m2 52,500

11 STANDARD GRASS BLOCK ABU-ABU BH 8,000

12 BATACO BH 3,400

13 KANSTEEN m' 21,000


NO. J E N I S B A H A N SAT HARGA

XVII. L A I N - L A I N -

1 KREI 25 MM m2 47,500

2 Sliding Pintu J4 bh 207,500

3 Naco per Daun bh 12,250

4 Rolling door Besi m2 312,500


Rolling door Almunium m2 252,500

5 Awning Almunium m2 217,500

6 Kusen Almunium 4" Putih m' 82,500

7 WIDE FLANGE BEAM -

150 X 75 X 5 X 7 X 12 btg 1,075,000


-

8 ASPAL. -
Aspal Ex Pertamina isi Net 160 kg drum 1,675,000
-
Hotmix Tebal = 4 Cm m2 67,500
Hotmix Tebal = 5 Cm m2 82,500
Hotmix Tebal = 6 Cm m2 97,500
Hotmix Tebal = 7 Cm m2 115,000
Binder Course ton 1,325,000
Wearing Course ton 1,375,000
Hot Roller Sheet ton 1,225,000
Sand Sheet ton 1,175,000
Sand Sheet Emulsi ton 1,525,000
Cold Mix ton 1,800,000
Prime / Tack Coard RC liter 8,450
Prime Coat MC liter 8,450
Prime / Tack Coat Emulsi liter 8,450

10 KACA -
Cermin tebal 5 mm m2 250,000
-

11 PAGAR BRC. Pagar BRC 90 A2 /lb 187,500


Pagar BRC 120 A2 /lb 237,500

12 LAIN-LAIN -
Minyak Beton & bekisting ltr 9,500

Pintu Lipat Besi m2 402,500


Sunscreen Allumunim m2 330,000

Allumunium Foil m2 7,750


Soda api kg 12,500

Sabun kg 12,000
Air m3 13,750
Koas Alang-alang ikat 1,625

Solar (Industri) ltr 7,100


Premium (Industri) ltr 6,500
Pelumas ltr 41,250
Vynil 30x30 cm bh 6,350
DAFTAR U PAH PE K E R JA

S U M B E R DATA :
D A E R A H :

NO. URAIAN PEKERJA SATUAN


HARGA

1 Pekerja Hr

2 Mandor Hr

3 Tukang listrik Hr

4 Tukang kayu Hr

5 Kep. tk. kayu Hr

6 Tukang batu Hr

7 Kep. tk. batu Hr

8 Tukang besi Hr

9 Kep. tk. besi Hr

10 T u k a n g c a t Hr

11 K e p . t k . c a t Hr

12 T u k a n g p l i t u r Hr

13 T u k a n g j a l a n Hr

14 T u k a n g g a l i Hr

15 Tukang masak aspal Hr

16 T k . l e i d e n g Hr

17 M a s i n i s Hr

18 P e m b . M a s i n i s Hr

19 P e n j a g a a p i Hr

20 P e n j a g a m a l a m Hr

21 Sopir Hr

22 Pembantu Sopir Hr

345293844.xls 65 daftar upah tenaga kerja (2)