Persiapan - Hal 1
Jumlah 1,531,846.69
Persiapan - Hal 2
Jumlah 1,160,399.30
Persiapan - Hal 3
Tukang Batu Oh 0.3000 98,831.04 29,649.31
Jumlah 173,901.49
A-13 1 M' Pagar Kawat Ayam Tiang Besi L50.50.5, tinggi 1 m'
Kawat Ram Ayam Lbr 0.4340 22,117.43 9,598.96
Besi Siku L50.50.5 Kg 6.0660 52,800.00 320,284.80
Besi Pelat (1,2 x 3) mm Kg 0.0424 21,729.40 921.33
Baut bh 4.0000 1,164.08 4,656.30
Semen Portland kg 2.5000 1,804.00 4,510.00
Pasir Beton M3 0.0050 318,180.50 1,590.90
Koral Beton M3 0.0090 237,988.67 2,141.90
Pekerja Oh 0.3750 70,593.60 26,472.60
Tukang Batu Oh 0.1250 98,831.04 12,353.88
Kepala Tukang Oh 0.0120 112,949.76 1,355.40
Mandor Oh 0.0190 120,009.12 2,280.17
Jumlah 386,166.24
Persiapan - Hal 4
Pekerja Oh 0.042 70,593.60 2,964.93
Tukang Besi Oh 0.042 98,831.04 4,150.90
Kepala Tukang Oh 0.004 112,949.76 451.80
Mandor Oh 0.002 120,009.12 240.02
Jumlah 55,785.62