HARGA
NO URAIAN PEKERJAAN VOLUME SAT SATUAN
(RP.)
I PEKERJAAN PERSIAPAN
1 Mobilisasi / demobilisasi 1.00 lot* 50,000,000.00
2 Dokumentasi dan pelaporan pekerjaan 1.00 lot* 5,000,000.00
JUMLAH PEKERJAAN PERSIAPAN
IV PEKERJAAN FINISHING
1. Pekerjaan Pembuangan Puing 1.00 Ls 25,000,000.00
2. Pembersihan Kembali 1.00 Ls 15,000,000.00
JUMLAH PEKERJAAN FINISHING
JUMLAH ( I + II + III+ IV)
PPN 10%
JUMLAH
PEMBULATAN
Terbilang :
Delapan Milyar Lima Ratus Lima Puluh Empat Juta Dua Puluh Satu Ribu Rupiah.
ERY FIRMANSYAH
Direktur Utama
DANAKUSUMA
JUMLAH
HARGA
(RP.)
50,000,000.00
5,000,000.00
55,000,000.00
1,823,894,182.36
5,818,432,404.32
7,642,326,586.68
331,250.00
38,725,000.00
39,056,250.00
25,000,000.00
15,000,000.00
40,000,000.00
7,776,382,836.68
777,638,283.67
8,554,021,120.34
8,554,021,000.00
Ribu Rupiah.
ERY FIRMANSYAH
Direktur Utama
JADWAL PELAKSANAAN PEKERJAAN
(KURVA S DAN BARCHART)
TOTAL WAKTU PELAKSANAAN : 90 (SEMBILAN PULUH) HARI KALENDER
I PEKERJAAN PERSIAPAN
1 Mobilisasi / demobilisasi lot* 1.00 50,000,000.00 50,000,000.00 0.643
2 Dokumentasi dan pelaporan pekerjaan lot* 1.00 5,000,000.00 5,000,000.00 0.064
IV PEKERJAAN FINISHING
1. Pekerjaan Pembuangan Puing Ls 1.00 25,000,000.00 25,000,000.00 0.321
2. Pembersihan Kembali Ls 1.00 15,000,000.00 15,000,000.00 0.193
Total Jumlah 7,776,382,836.68 100.000
Rencana Bobot Kemajuan per Minggu 0.00 0.00 0.00 0.00 0.00 0.00
Kumulatif Bobot Kemajuan Per Minggu - 0.00 0.00 0.00 0.00 0.00 0.00
CATATAN :
TOTAL WAKTU PELAKSANAAN : 90 HARI KALENDER (JAM KERJA DARI PUKUL 21.00 - 04.00 DINI HARI)
MASA PEMELIHARAAN : 180 HARI KALENDER
BULAN KE - 2 BULAN KE - 3
KET
M-7 M-8 M-9 M-10 M-11 M-12
100
75
50
25
0
0.00 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00 0.00
ERY FIRMANSYAH
Direktur Utama
DAFTAR HARGA SATUAN UPAH
HARGA UPAH
NO URAIAN SATUAN UPAH UPAH
ORANG/JAM ORANG/HARI
HARGA
No KETERANGAN SATUAN
(Rp)
1 Masterseal PG 470 kg 385,000.00
2 backup rod m 5,200.00
3 Pasir Pasang M3 145,600.00
4 Pasir Beton m3 215,600.00
5 Kerosen / Minyak Tanah liter 12,000.00
6 Semen / PC (50kg) zak 70,000.00
7 Cat Marka (Non Thermoplas) kg 25,000.00
8 Cat Marka (Thermoplastic) kg 22,500.00
9 Paku kg 19,000.00
10 B e n s i n ltr 7,000.00
11 S o l a r ltr 10,500.00
12 Minyak Pelumas / Olie ltr 27,500.00
13 Plastik Filter m2 17,500.00
14 Geotextile m2 35,000.00
15 Thinner ltr 20,000.00
16 . Glass Bead kg 24,000.00
17 Pelat Rambu (Eng. Grade) bh 180,000.00
18 Pelat Rambu (High I. Grade) bh 220,000.00
19 Rel Pengaman m 480,000.00
20 Beton K-225 (Ready Mix) m3 900,000.00
21 Beton K-250 (Ready Mix) m3 910,000.00
22 Baja Tulangan (Polos) kg 10,000.00
23 Baja Tulangan (Ulir) kg 11,000.00
24 Baja Tulangan (Ulir) D39 M39c Kg 12,500.00 Lokasi Pekerjaan kg 12,500.00
25 Cat M42 Kg 34,500.00 Base Camp kg 34,500.00
26 Pemantul Cahaya (Reflector) M43 Bh. 15,000.00 Base Camp bh 15,000.00
27 Agregat Kasar M3 211,030.00
ANALISA HARGA SATUAN PEKERJAAN
Bongkar Joint sealant lama dan pembersihan nat
Koefesien
1 M Membersihkan Nat Harga Sat JUMLAH
Pekerja Jam 0.3000 10,625.00 3,187.50
Mandor Jam 0.5000 15,625.00 7,812.50
Alat Jam 0.2000 100,000.00 20,000.00
Jumlah 31,000.00
Dibulatkan 31,000.00
Jumlah 16,562.50
Dibulatkan 16,560.00
jumlah total 47,560.00
Jumlah 151,721.88
PEMBONGKARAN SLAB BETON M3
Jumlah 13,250.00
Dibulatkan 13,250.00
Jumlah 1,549,009.84
Dibulatkan 1,549,000.00
DAFTAR ALAT YANG DIGUNAKAN