C. BAHAN LOGAM
1 Besi beton U-24, rata - rata uk. dia 8 s/d 16 mm kg 12,500.00
2 Besi Strip, uk. 3 x 30 mm x 6 m ( 4,21 Kg ) Kg 8,500.00
3 Seng BJLS 0.30, l = 55 cm ( 1 rol = 50 m' ) m' 36,000.00
4 Kawat beton kg 17,000.00
5 Paku 1/2" - 1" kg 17,000.00
6 Paku uk. 2" - 5" kg 15,000.00
7 Paku uk. 3" - 6" kg 14,000.00
8 Rangka Attap Baja Ringan m2 130,000.00
H BAHAN ELEKTRIKAL
1 Saklar Broko Tunggal Standard ( 1 phase ) bh 15,000.00
2 Saklar Broko Seri Standard ( 1 phase ) bh 17,500.00
3 Stop Kontak Broko Standard ( 1 phase ) bh 15,000.00
4 Stop Kontak Broko Standard ( 3 phase ) bh 22,500.00
5 Lampu Pijar 25 watt + Amature bh 35,000.00
6 Lampu SL 25 watt + Amature bh 50,000.00
7 Lampu TL 40 watt + Amature bh 95,000.00
8 Kabel NYM 3 X 1.5 Prima rol 325,000.00
9 Kabel NYM 3 X 2.5 Prima rol 450,000.00
10 Kabel NYM 4 X 2.5 Prima rol 595,000.00
11 NCB 6 AMPER MG bh 35,000.00
12 NCB 10 AMPER MG bh 47,500.00
13 NCB 16 AMPER MG bh 60,000.00
I BAHAN FINISHING.
1 Ampelas bh 2,500.00
2 Kwas 3" bh 9,000.00
3 Rool Cat bh 20,000.00
4 Cat tembok Sanlex kg 35,000.00
5 Cat kayu / besi Avian kg 45,000.00
6 Meni kayu / besi Bola mas kg 17,500.00
7 Plint coat ltr 17,500.00
8 Dempul tembok ( plamuur ) Sanlex kg 9,000.00
9 Dempul kayu cap kucing kg 22,500.00
10 Solignem ( 1 blek = 10 liter ) ltr 6,000.00
DAFTAR RINCIAN ANALISA HARGA SATUAN PEKERJAAN
-
RUANG PRAKTIK SISWA ( RPS )
SMK ISLAM PANIIS KAB.TASIKMALAYA
5
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
5 1 M3 URUGAN PASIR ( SNI. Edisi Rev. 2008 )
Bahan :
Pasir urug M3 1.2000 190,000.00 228,000.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Mandor Oh 0.0100 160,000.00 - 1,600.00
Jumlah 228,000.00 27,100.00 255,100.00
Keuntungan 13.00% 13.00% 33,163.00
Jumlah 288,263.00
Dibulatkan 288,260.00
C ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI BATU KALI
1 1 M3 PASANGAN BATU KOSONG / AANSTAMPING ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah M3 1.2000 141,000.00 169,200.00 -
Pasir urug M3 0.4320 190,000.00 82,080.00 -
Tenaga Kerja :
Pekerja Oh 0.7800 85,000.00 - 66,300.00
Tukang Batu Oh 0.3900 95,000.00 - 37,050.00
Kepala Tukang Batu Oh 0.0390 105,000.00 - 4,095.00
Mandor Oh 0.0390 160,000.00 - 6,240.00
Jumlah 251,280.00 113,685.00 364,965.00
Keuntungan 13.00% 13.00% 47,445.45
Jumlah 412,410.45
Dibulatkan 412,410.00
2 1 M3 PASANGAN PONDASI BATU KALI, 1 PC. : 3 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah 15/20 cm M3 1.1000 141,000.00 155,100.00 -
Semen Portland Kg 202.0000 1,650.00 333,300.00 -
Pasir Pasang M3 0.4850 290,000.00 140,650.00 -
Tenaga Kerja :
Pekerja Oh 1.5000 85,000.00 - 127,500.00
Tukang Batu Oh 0.7500 95,000.00 - 71,250.00
Kepala Tukang Batu Oh 0.0750 105,000.00 - 7,875.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 629,050.00 218,625.00 847,675.00
Keuntungan 13.00% 13.00% 110,197.75
Jumlah 957,872.75
Dibulatkan 957,870.00
3 1 M3 PASANGAN PONDASI BATU KALI, 1 PC. : 5 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah 15/20 cm M3 1.2000 141,000.00 169,200.00 -
Semen Portland Kg 136.0000 1,650.00 224,400.00 -
Pasir Pasang M3 0.5440 290,000.00 157,760.00 -
Tenaga Kerja :
Pekerja Oh 1.5000 85,000.00 - 127,500.00
Tukang Batu Oh 0.7500 95,000.00 - 71,250.00
Kepala Tukang Batu Oh 0.0750 105,000.00 - 7,875.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 551,360.00 218,625.00 769,985.00
Keuntungan 13.00% 13.00% 100,098.05
Jumlah 870,083.05
Dibulatkan 870,080.00
6
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
D ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 3 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Bata Merah Bh 70.0000 1,000.00 70,000.00 -
Semen Portland Kg 14.3700 1,650.00 23,710.50 -
Pasir Pasang M3 0.0400 290,000.00 11,600.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1000 95,000.00 - 9,500.00
Kepala Tukang Batu Oh 0.0100 105,000.00 - 1,050.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 105,310.50 38,450.00 143,760.50
Keuntungan 13.00% 13.00% 18,688.87
Jumlah 162,449.37
Dibulatkan 162,440.00
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 5 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Bata Merah Bh 70.0000 1,000.00 70,000.00 -
Semen Portland Kg 9.6800 1,650.00 15,972.00 -
Pasir Pasang M3 0.0450 290,000.00 13,050.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1000 95,000.00 - 9,500.00
Kepala Tukang Batu Oh 0.0100 105,000.00 - 1,050.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 99,022.00 38,450.00 137,472.00
Keuntungan 13.00% 13.00% 17,871.36
Jumlah 155,343.36
Dibulatkan 155,340.00
E ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
1 1 M2 PLESTERAN DINDING 1 PC. : 3 PS; TEB. 15 MM ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 7.7760 1,650.00 12,830.40 -
Pasir Pasang M3 0.0230 290,000.00 6,670.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1500 95,000.00 - 14,250.00
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1,575.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 19,500.40 43,725.00 63,225.40
Keuntungan 13.00% 13.00% 8,219.30
Jumlah 71,444.70
Dibulatkan 71,440.00
2 1 M2 PLESTERAN DINDING 1 PC. : 5 PS; TEB. 15 MM ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 5.1840 1,650.00 8,553.60 -
Pasir Pasang M3 0.0260 290,000.00 7,540.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1500 95,000.00 - 14,250.00
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1,575.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 16,093.60 43,725.00 59,818.60
Keuntungan 13.00% 13.00% 7,776.42
Jumlah 67,595.02
Dibulatkan 67,590.00
7
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
3 1 M2 PLESTERAN SIAR PASANGAN BATU KALI, 1PC. : 2 PS, ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 6.3400 1,650.00 10461.0000 -
Pasir Pasang M3 0.0120 290,000.00 3480.0000 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25500.0000
Tukang Batu Oh 0.1500 95,000.00 - 14250.0000
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1575.0000
Mandor Oh 0.0150 160,000.00 - 2400.0000
Jumlah 13,941.00 43,725.00 57,666.00
Keuntungan 13.00% 13.00% 7,496.58
Jumlah 65,162.58
Dibulatkan 65,160.00
F ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
1 1 M3 LANTAI KERJA BETON K-100 ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland kg 230.0000 1,650.00 379,500.00 -
Pasir beton m3 0.6400 390,000.00 249,600.00 -
Koral beton m3 0.7600 140,000.00 106,400.00 -
Air liter 200.0000 50.00 10,000.00
Tenaga Kerja :
Pekerja Oh 1.2000 85,000.00 - 102,000.00
Tukang Batu Oh 0.2000 95,000.00 - 19,000.00
Kepala Tukang Batu Oh 0.0200 105,000.00 - 2,100.00
Mandor Oh 0.0600 160,000.00 - 9,600.00
Jumlah 745,500.00 132,700.00 878,200.00
Keuntungan 13.00% 13.00% 114,166.00
Jumlah 992,366.00
Dibulatkan 992,360.00
2 1 M3 ADUKAN BETON K-175 ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 326.0000 1,650.00 537,900.00 -
Pasir Beton M3 0.5400 390,000.00 210,600.00 -
Koral Beton M3 0.7600 140,000.00 106,400.00 -
Air liter 215.0000 50.00 10,750.00
Tenaga Kerja :
Pekerja Oh 1.6500 85,000.00 - 140,250.00
Tukang Batu Oh 0.2750 95,000.00 - 26,125.00
Kepala Tukang Batu Oh 0.0280 105,000.00 - 2,940.00
Mandor Oh 0.0830 160,000.00 - 13,280.00
Jumlah 865,650.00 182,595.00 1,048,245.00
Keuntungan 13.00% 13.00% 136,271.85
Jumlah 1,184,516.85
Dibulatkan 1,184,510.00
8
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 KG TULANGAN BETON DENGAN BESI POLOS / ULIR ( SNI. Edisi Rev. 2008 )
Bahan :
Besi Beton Polos Kg 1.0500 12,500.00 13,125.00 -
Kawat Beton kg 0.0150 17,000.00 255.00 -
Tenaga Kerja :
Pekerja Oh 0.0070 85,000.00 - 595.00
Tukang Besi Oh 0.0070 125,000.00 - 875.00
Kepala Tukang Besi Oh 0.0007 135,000.00 - 94.50
Mandor Oh 0.0004 160,000.00 - 64.00
Jumlah 13,380.00 1,628.50 15,008.50
Keuntungan 13.00% 13.00% 1,951.11
Jumlah 16,959.61
Dibulatkan 16,950.00
5 1 M2.PASANG BEKISTING UNTUK SLOOF, RINGBALK DAN KUDA-KUDA BETON (SNI.Edisi Rev. 2008)
Bahan :
Kayu Papan/balok Albasia M3 0.0450 1,080,000.00 48,600.00 -
Paku Biasa 2" - 5" Kg 0.3000 15,000.00 4,500.00 -
Minyak Bekisting Lt 0.1000 3,000.00 300.00 -
Tenaga Kerja :
Pekerja Oh 0.5200 85,000.00 - 44,200.00
Tukang Kayu Oh 0.2600 125,000.00 - 32,500.00
Kepala Tukang Kayu Oh 0.0260 135,000.00 - 3,510.00
Mandor Oh 0.0260 160,000.00 - 4,160.00
Jumlah 53,400.00 84,370.00 137,770.00
Keuntungan 13.00% 13.00% 17,910.10
Jumlah 155,680.10
Dibulatkan 155,680.00
6 1 M2. PASANG BEKISTING UNTUK KOLOM ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu kls II M3 0.0150 1,080,000.00 16,200.00 -
Dolken dia 5/7 cm Btg 2.0000 13,500.00 27,000.00
Tenaga Kerja :
Pekerja Oh 0.6600 85,000.00 - 56,100.00
Tukang Kayu Oh 0.3300 125,000.00 - 41,250.00
Kepala Tukang Kayu Oh 0.0330 135,000.00 - 4,455.00
Mandor Oh 0.0330 160,000.00 - 5,280.00
Jumlah 93,000.00 107,085.00 200,085.00
Keuntungan 13.00% 13.00% 26,011.05
Jumlah 226,096.05
Dibulatkan 226,090.00
7 1 M2. PASANG BEKISTING UNTUK BALOK ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu Kls II M3 0.0180 1,080,000.00 19,440.00 -
Dolken dia 5/7 cm Btg 2.0000 13,500.00 27,000.00 -
Tenaga Kerja :
Pekerja Oh 0.6600 85,000.00 - 56,100.00
Tukang Kayu Oh 0.3300 125,000.00 - 41,250.00
Kepala Tukang Kayu Oh 0.0330 135,000.00 - 4,455.00
Mandor Oh 0.0330 160,000.00 - 5,280.00
Jumlah 96,240.00 107,085.00 203,325.00
Keuntungan 13.00% 13.00% 26,432.25
Jumlah 229,757.25
Dibulatkan 229,750.00
9
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
8 1 M2. PASANG BEKISTING UNTUK LANTAI ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu Kls II M3 0.0150 1,080,000.00 16,200.00 -
Plywood tebal 9 mm Lbr 0.3500 125,000.00 43,750.00 -
Dolken dia 5/7 cm Btg 6.0000 13,500.00 81,000.00 -
Tenaga Kerja :
Pekerja Oh 0.6600 85,000.00 - 56,100.00
Tukang Kayu Oh 0.3300 125,000.00 - 41,250.00
Kepala Tukang Kayu Oh 0.0330 135,000.00 - 4,455.00
Mandor Oh 0.0330 160,000.00 - 5,280.00
Jumlah 190,750.00 107,085.00 297,835.00
Keuntungan 13.00% 13.00% 38,718.55
Jumlah 336,553.55
Dibulatkan 336,550.00
9 1 M3 COR BETON COMPOSITE KOLOM STRUKTUR 15/20, K-175
Beton Site Mixed m3 1.0000 1,100,760.00 1,100,760.00
Bekisting (dipakai min 2 kali) m2 11.6667 224,030.00 2,613,683.33
Jumlah 3,714,443.33 - 3,714,443.33
Keuntungan 13.00% 13.00% 482,877.63
Jumlah 4,197,320.97
Dibulatkan 4,197,320.00
10 1 M3 COR BETON COMPOSITE KOLOM PENYANGGA 15/20, K-175
Beton Site Mixed m3 1.0000 1,100,760.00 1,100,760.00
Bekisting (dipakai min 2 kali) m2 23.3333 224,030.00 5,227,366.67
Jumlah 6,328,126.67 - 6,328,126.67
Keuntungan 13.00% 13.00% 822,656.47
Jumlah 7,150,783.13
Dibulatkan 7,150,780.00
G ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
1 1 M3 PASANGAN KUSEN PINTU & JENDELA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok M3 1.1000 2,750,000.00 3,025,000.00 -
Paku Biasa 2" - 5" Kg 1.2500 15,000.00 18,750.00
lem putih ( FOX ) Kg 1.0000 17,500.00 17,500.00
Tenaga Kerja :
Pekerja Oh 7.0000 85,000.00 - 595,000.00
Tukang Kayu Oh 21.0000 125,000.00 - 2,625,000.00
Kepala Tukang Kayu Oh 2.1000 135,000.00 - 283,500.00
Mandor Oh 0.3500 160,000.00 - 56,000.00
Jumlah 3,061,250.00 3,559,500.00 6,620,750.00
Keuntungan 13.00% 13.00% 860,697.50
Jumlah 7,481,447.50
Dibulatkan 7,481,440.00
2 1 M3 PASANGAN KUSEN PINTU & JENDELA LAMA
Tenaga Kerja :
Pekerja Oh 7.0000 85,000.00 - 595,000.00
Tukang Kayu Oh 21.0000 125,000.00 - 2,625,000.00
Kepala Tukang Kayu Oh 2.1000 135,000.00 - 283,500.00
Mandor Oh 0.3500 160,000.00 - 56,000.00
Jumlah - 3,559,500.00 3,559,500.00
Keuntungan 13.00% 13.00% 462,735.00
Jumlah 4,022,235.00
Dibulatkan 4,022,230.00
3 1 M2 PASANGAN PINTU PANIL, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0400 2,750,000.00 110,000.00 -
lem putih ( FOX ) Kg 0.5000 17,500.00 8,750.00
Tenaga Kerja :
Pekerja Oh 1.0000 85,000.00 - 85,000.00
Tukang Kayu Oh 3.0000 125,000.00 - 375,000.00
Kepala Tukang Kayu Oh 0.3000 135,000.00 - 40,500.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah 118,750.00 508,500.00 627,250.00
Keuntungan 13.00% 13.00% 81,542.50
Jumlah 708,792.50
Dibulatkan 708,790.00
10
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 M2 PASANGAN PINTU PANIL LAMA
Tenaga Kerja :
Pekerja Oh 1.0000 85,000.00 - 85,000.00
Tukang Kayu Oh 3.0000 125,000.00 - 375,000.00
Kepala Tukang Kayu Oh 0.3000 135,000.00 - 40,500.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah - 508,500.00 508,500.00
Keuntungan 13.00% 13.00% 66,105.00
Jumlah 574,605.00
Dibulatkan 574,600.00
5 1 M2 PASANGAN PINTU PANIL & JENDELA KACA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0240 2,750,000.00 66,000.00 -
lem putih ( FOX ) Kg 0.3000 17,500.00 5,250.00
Tenaga Kerja :
Pekerja Oh 0.8000 85,000.00 - 68,000.00
Tukang Kayu Oh 2.4000 125,000.00 - 300,000.00
Kepala Tukang Kayu Oh 0.2400 135,000.00 - 32,400.00
Mandor Oh 0.0400 160,000.00 - 6,400.00
Jumlah 71,250.00 406,800.00 478,050.00
Keuntungan 13.00% 13.00% 62,146.50
Jumlah 540,196.50
Dibulatkan 540,190.00
6 1 M2 PASANGAN DAUN PARTISI
Bahan :
Balok kayu Kls II (6X12 ) cm M3 0.0280 2,750,000.00 77,000.00 -
Paku Biasa 2" - 5" Kg 0.1500 15,000.00 2,250.00
Triplek 4 mm Lbr 0.8600 50,000.00 43,000.00
Lem kayu Kg 0.5600 17,500.00 9,800.00 -
Tenaga Kerja :
Pekerja Oh 0.2000 85,000.00 - 17,000.00
Tukang Kayu Oh 0.6000 125,000.00 - 75,000.00
Kepala Tukang Kayu Oh 0.0600 135,000.00 - 8,100.00
Mandor Oh 0.0100 160,000.00 - 1,600.00
Jumlah 132,050.00 101,700.00 233,750.00
Keuntungan 13.00% 13.00% 30,387.50
Jumlah 264,137.50
Dibulatkan 264,130.00
7 1 M2 PASANGAN DAUN PINTU DOUBLE TRIPLEK
Bahan :
Rangka kayu kls II M3 0.0150 2,750,000.00 41,250.00 -
Triplek 4 mm Lbr 1.0200 50,000.00 51,000.00
Paku triplek Kg 0.2000 17,000.00 3,400.00
lem putih ( FOX ) Kg 0.5000 17,500.00 8,750.00
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Kayu Oh 1.3000 125,000.00 - 162,500.00
Kepala Tukang Kayu Oh 0.1300 135,000.00 - 17,550.00
Mandor Oh 0.0130 160,000.00 - 2,080.00
Jumlah 104,400.00 207,630.00 312,030.00
Keuntungan 13.00% 13.00% 40,563.90
Jumlah 352,593.90
Dibulatkan 352,590.00
11
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
8 1 M2 PASANGAN JALUSI KUSEN KAYU KELAS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0600 2,750,000.00 165,000.00 -
Paku biasa 1" - 2" Kg 0.1500 17,000.00 2,550.00 -
Tenaga Kerja :
Pekerja Oh 0.6700 85,000.00 - 56,950.00
Tukang Kayu Oh 2.0000 125,000.00 - 250,000.00
Kepala Tukang Kayu Oh 0.2000 135,000.00 - 27,000.00
Mandor Oh 0.3350 160,000.00 - 53,600.00
Jumlah 167,550.00 387,550.00 555,100.00
Keuntungan 13.00% 13.00% 72,163.00
Jumlah 627,263.00
Dibulatkan 627,260.00
9 1 M3 PASANG KONSTRUKSI KUDA-KUDA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok M3 1.1000 2,750,000.00 3,025,000.00 -
Besi strip Kg 15.0000 8,500.00 127,500.00 -
Paku biasa 2" - 5" Kg 5.6000 15,000.00 84,000.00 -
Tenaga Kerja :
Pekerja Oh 4.0000 85,000.00 - 340,000.00
Tukang Kayu Oh 12.0000 125,000.00 - 1,500,000.00
Kepala Tukang Kayu Oh 1.2000 135,000.00 - 162,000.00
Mandor Oh 0.2000 160,000.00 - 32,000.00
Jumlah 3,236,500.00 2,034,000.00 5,270,500.00
Keuntungan 13.00% 13.00% 685,165.00
Jumlah 5,955,665.00
Dibulatkan 5,955,660.00
12 1 M3 PASANG KONSTRUKSI GORDENG, KAYU LAMA
Bahan :
Besi strip Kg 15.0000 8,500.00 127,500.00 -
Paku biasa 2" - 5" Kg 3.0000 15,000.00 45,000.00 -
Tenaga Kerja :
Pekerja Oh 2.4000 85,000.00 - 204,000.00
Tukang Kayu Oh 7.2000 125,000.00 - 900,000.00
Kepala Tukang Kayu Oh 0.7200 135,000.00 - 97,200.00
Mandor Oh 0.1200 160,000.00 - 19,200.00
Jumlah 172,500.00 1,220,400.00 1,392,900.00
Keuntungan 13.00% 13.00% 181,077.00
Jumlah 1,573,977.00
Dibulatkan 1,573,970.00
12
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
13 1 M2 PASANG RANGKA ATAP KASO + RENG, GENTENG KERAMIK KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kaso-kaso 5/7 cm, Kayu Kelas II M3 0.0140 2,000,000.00 28,000.00 -
Reng 2/3 cm M3 0.0036 2,000,000.00 7,200.00
Paku biasa 2" - 5" Kg 0.2500 15,000.00 3,750.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 38,950.00 23,150.00 62,100.00
Keuntungan 13.00% 13.00% 8,073.00
Jumlah 70,173.00
Dibulatkan 70,170.00
14 1 M2 RENG KLS II
Bahan :
Reng 2/3 cm M3 0.0036 2,000,000.00 7,200.00
Paku biasa 2" - 5" Kg 0.1250 15,000.00 1,875.00 -
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Kayu Oh 0.0800 125,000.00 - 10,000.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 9,075.00 17,875.00 26,950.00
Keuntungan 13.00% 13.00% 3,503.50
Jumlah 30,453.50
Dibulatkan 30,450.00
15 1 M2 PAS. KASO KAYU KLS II
Bahan :
Kaso-kaso 5/7 cm, Kayu Kelas II M3 0.0140 2,000,000.00 28,000.00 -
Paku biasa 2" - 5" Kg 0.1250 15,000.00 1,875.00 -
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Kayu Oh 0.0800 125,000.00 - 10,000.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 29,875.00 17,875.00 47,750.00
Keuntungan 13.00% 13.00% 6,207.50
Jumlah 53,957.50
Dibulatkan 53,950.00
17 1 M2 PASANG RANGKA LANGIT-LANGIT 50 x 100 CM, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok 5/7 M3 0.0154 2,000,000.00 30,800.00 -
Paku biasa 2" - 5" Kg 0.2000 15,000.00 3,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.3000 125,000.00 - 37,500.00
Kepala Tukang Kayu Oh 0.0300 135,000.00 - 4,050.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 33,800.00 66,300.00 100,100.00
Keuntungan 13.00% 13.00% 13,013.00
Jumlah 113,113.00
Dibulatkan 113,110.00
13
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
18 1 M2 PASANG RANGKA LANGIT-LANGIT 50 x 100 CM, KAYU LAMA
Bahan :
Paku biasa 2" - 5" Kg 0.2000 15,000.00 3,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 125,000.00 - 18,750.00
Tukang Kayu Oh 0.3000 - - -
Kepala Tukang Kayu Oh 0.0300 1,050,000.00 - 31,500.00
Mandor Oh 0.0750 - - -
Jumlah 3,000.00 50,250.00 53,250.00
Keuntungan 13.00% 13.00% 5,325.00
Jumlah 58,575.00
Dibulatkan 58,570.00
19 1 M2 PASANG LISTPLANK 3 x 30 CM, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Papan Kls II M3 0.0110 2,000,000.00 22,000.00 -
Paku biasa 2" - 5" Kg 0.0500 15,000.00 750.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 22,750.00 37,000.00 59,750.00
Keuntungan 13.00% 13.00% 7,767.50
Jumlah 67,517.50
Dibulatkan 67,510.00
20 1 M2 PASANG LISTPLANK 3 x 30 CM, KAYU LAMA
Bahan :
Paku biasa 2" - 5" Kg 0.0500 35,500.00 1,775.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 1,775.00 37,000.00 38,775.00
Keuntungan 13.00% 13.00% 5,040.75
Jumlah 43,815.75
Dibulatkan 43,810.00
21 1 M1 PASANG PAPAN RUITER
Bahan :
Kayu kls II, Papan M3 0.0043 2,750,000.00 11,825.00 -
Paku biasa 2" - 5" Kg 0.0300 15,000.00 450.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah 12,275.00 30,350.00 42,625.00
Keuntungan 13.00% 13.00% 5,541.25
Jumlah 48,166.25
Dibulatkan 48,160.00
14
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
H ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
1 1 M2 PASANG ATAP GENTENG PALENTONG EX JATIWANGI ( SNI. Edisi Rev. 2002 )
Bahan :
Genteng Palentong Ex Jatiwangi Bh 25.0000 2,600.00 65,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.0600 125,000.00 - 7,500.00
Kepala Tukang Kayu Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0080 160,000.00 - 1,280.00
Jumlah 65,000.00 22,340.00 87,340.00
Keuntungan 13.00% 13.00% 11,354.20
Jumlah harga 98,694.20
Dibulatkan 98,690.00
2 1 M2 PASANG ATAP GENTENG PALENTONG LAMA
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.0600 125,000.00 - 7,500.00
Kepala Tukang Kayu Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0080 160,000.00 - 1,280.00
Jumlah - 22,340.00 22,340.00
Keuntungan 13.00% 13.00% 2,904.20
Jumlah harga 25,244.20
Dibulatkan 25,240.00
3 1 M1 PASANG GENTENG BUBUNG PALENTONG EX JATIWANGI ( SNI. Edisi Rev. 2002 )
Bahan :
Genteng Bubung Palentong Ex Ja Bh 4.0000 4,750.00 19,000.00 -
Semen Portland Kg 8.0000 1,650.00 13,200.00 -
Pasir Pasang M3 0.0320 290,000.00 9,280.00 -
Tenaga Kerja :
Pekerja Oh 0.4000 85,000.00 - 34,000.00
Tukang Batu Oh 0.2000 95,000.00 - 19,000.00
Kepala Tukang Batu Oh 0.0200 105,000.00 - 2,100.00
Mandor Oh 0.0020 160,000.00 - 320.00
Jumlah 41,480.00 55,420.00 96,900.00
Keuntungan 13.00% 13.00% 12,597.00
Jumlah harga 109,497.00
Dibulatkan 109,490.00
I ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT
1 1 M2 LANGIT - LANGIT GRC, T = 4 MM ( SNI Edisi Rev. 2008 )
Bahan :
GRC Lbr 0.3750 55,000.00 20,625.00 -
Paku 1/2" - 1" Kg 0.0300 15,000.00 450.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 21,075.00 23,150.00 44,225.00
Keuntungan 13.00% 13.00% 5,749.25
Jumlah 49,974.25
Dibulatkan 49,970.00
J ANALISA BIAYA INSTALASI AIR KOTOR
1 1 M' PEKERJAAN SALURAN AIR HUJAN DARI PAS BATA + PLESTERAN DAN ACIAN
Pek.Galian tanah m3 0.1500 76,550.00 11,482.50 -
Pas. Bata 1:3 m2 0.4000 162,440.00 64,976.00 -
Plesteran 1:3 + Acian m2 0.4000 71,440.00 28,576.00
Jumlah 105,034.50 - 105,034.50
Dibulatkan 105,030.00
15
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
K ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
1 1 M' PASANG TALANG MIRING, SENG BJLS 30 ( SNI. Edisi Rev. 2002 )
Bahan :
Seng Plat BJLS 30 Lbr 0.5000 36,000.00 18,000.00 -
Paku biasa 1/2" - 1" Kg 0.0150 17,000.00 255.00 -
Kayu kls II, Papan M3 0.0190 2,750,000.00 52,250.00 -
Flincote / Meni Besi Kg 0.3000 17,500.00 5,250.00 -
Tenaga Kerja :
Pekerja Oh 0.0400 85,000.00 - 3,400.00
Tukang Kayu Oh 0.4000 125,000.00 - 50,000.00
Kepala Tukang Kayu Oh 0.0250 135,000.00 - 3,375.00
Mandor Oh 0.00125 160,000.00 - 200.00
Jumlah 75,755.00 56,975.00 132,730.00
Keuntungan 13.00% 13.00% 17,254.90
Jumlah 149,984.90
Dibulatkan 149,980.00
2 1 M' PASANG PLASING SENG
Bahan :
Seng Plat BJLS 30 Lbr 0.5000 36,000.00 18,000.00 -
Paku biasa 1/2" - 1" Kg 0.0150 17,000.00 255.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.4000 125,000.00 - 50,000.00
Kepala Tukang Kayu Oh 0.0250 135,000.00 - 3,375.00
Mandor Oh 0.00125 160,000.00 - 200.00
Jumlah 18,255.00 66,325.00 84,580.00
Keuntungan 13.00% 13.00% 10,995.40
Jumlah 95,575.40
Dibulatkan 95,570.00
L ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA
1 1 BUAH PASANG KUNCI 2 SLAAG ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci 2 Slaag (Merk Kuda terbang) Bh 1.0000 95,000.00 95,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0100 85,000.00 - 850.00
Tukang Kayu Oh 0.5000 125,000.00 - 62,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 95,000.00 65,500.00 160,500.00
Keuntungan 13.00% 13.00% 20,865.00
Jumlah 181,365.00
Dibulatkan 181,360.00
2 1 BUAH PASANG KUNCI TANAM KAMAR MANDI ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci Tanam Kamar Mandi (Merk A Bh 1.0000 75,000.00 75,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0050 85,000.00 - 425.00
Tukang Kayu Oh 0.5000 125,000.00 - 62,500.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 75,000.00 64,000.00 139,000.00
Keuntungan 13.00% 13.00% 18,070.00
Jumlah 157,070.00
Dibulatkan 157,070.00
16
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU ( SNI. Edisi Rev. 2002 )
Bahan :
Engsel Jendela Bh 1.0000 4,800.00 4,800.00 -
Tenaga Kerja :
Pekerja Oh 0.0100 85,000.00 - 850.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0005 160,000.00 - 80.00
Jumlah 4,800.00 14,780.00 19,580.00
Keuntungan 13.00% 13.00% 2,545.40
Jumlah 22,125.40
Dibulatkan 22,120.00
5 1 BUAH PASANG KAIT ANGIN ( SNI. Edisi Rev. 2002 )
Bahan :
Kait Angin type sendok Bh 1.0000 7,500.00 7,500.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 7,500.00 22,170.00 29,670.00
Keuntungan 13.00% 13.00% 3,857.10
Jumlah 33,527.10
Dibulatkan 33,520.00
6 1 BUAH PASANG KUNCI SELOT ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci Selot Bh 1.0000 5,000.00 5,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 5,000.00 29,560.00 34,560.00
Keuntungan 13.00% 13.00% 4,492.80
Jumlah 39,052.80
Dibulatkan 39,050.00
7 1 BUAH PASANG SELOT JENDELA
Bahan :
Selot Jendela Bh 1.0000 6,000.00 6,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 6,000.00 29,560.00 35,560.00
Keuntungan 13.00% 13.00% 4,622.80
Jumlah 40,182.80
Dibulatkan 40,180.00
17
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
9 1 M2 PASANGAN KACA, T = 3 MM ( SNI. Edisi Rev. 2002 )
Bahan :
Kaca 3 mm(Asahi) Bh 1.1000 35,500.00 39,050.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 39,050.00 22,170.00 61,220.00
Keuntungan 13.00% 13.00% 7,958.60
Jumlah 69,178.60
Dibulatkan 69,170.00
10 1 M2 PASANGAN KACA, T = 5 MM ( SNI. Edisi Rev. 2002 )
Bahan :
Kaca 5 mm(Asahi) M2 1.1000 150,000.00 165,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 165,000.00 22,170.00 187,170.00
Keuntungan 13.00% 13.00% 24,332.10
Jumlah 211,502.10
Dibulatkan 211,500.00
M ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI
1 1 M2 PASANGAN LANTAI KERAMIK , UK. 30x 30 CM ( SNI. Edisi Rev. 2002 )
Bahan :
Ubin Keramik, uk. 30 x 30 cm Muly Bh 11.8700 6,318.45 75,000.00 -
Semen Portland Kg 11.3800 1,650.00 18,777.00 -
Pasir Pasang M3 0.0420 290,000.00 12,180.00 -
Semen Warna ( putih ) Kg 1.5000 3,500.00 5,250.00 -
Tenaga Kerja :
Pekerja Oh 0.6200 85,000.00 - 52,700.00
Tukang Batu Oh 0.3500 95,000.00 - 33,250.00
Kepala Tukang Batu Oh 0.0350 105,000.00 - 3,675.00
Mandor Oh 0.0300 160,000.00 - 4,800.00
Jumlah 111,207.00 94,425.00 205,632.00
Keuntungan 13.00% 13.00% 26,732.16
Jumlah 232,364.16
Dibulatkan 232,360.00
N ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
1 1 M2 PENGECATAN BIDANG KAYU BARU, 2X LAPIS PENUTUP
Bahan :
Cat Meni Kg 0.2000 17,500.00 3,500.00 -
Dempul Kayu(cap kucing) Kg 0.1500 22,500.00 3,375.00 -
Cat Kayu(Avian) Penutup, 2x Kg 0.2600 45,000.00 11,700.00 -
Ampelas bh 0.4000 2,500.00 1,000.00 -
Kwas 3" bh 0.0500 9,000.00 450.00
Tenaga Kerja :
Pekerja Oh 0.0700 85,000.00 - 5,950.00
Tukang Cat Oh 0.0090 125,000.00 - 1,125.00
Kepala Tukang Cat Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 20,025.00 8,285.00 28,310.00
Keuntungan 13.00% 13.00% 3,680.30
Jumlah 31,990.30
Dibulatkan 31,990.00
18
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
2 1 M2 PENGECATAN BIDANG KAYU LAMA, 2X LAPIS PENUTUP
Bahan :
Cat Kayu (Avian) Penutup, 2x Kg 0.2600 45,000.00 11,700.00 -
Kwas 3" bh 0.0500 9,000.00 450.00
Tenaga Kerja :
Pekerja Oh 0.0700 85,000.00 - 5,950.00
Tukang Cat Oh 0.0090 125,000.00 - 1,125.00
Kepala Tukang Cat Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 12,150.00 8,285.00 20,435.00
Keuntungan 13.00% 13.00% 2,656.55
Jumlah 23,091.55
Dibulatkan 23,090.00
3 1 M2 PENGECATAN BIDANG BESI BARU, 2X LAPIS PENUTUP
Bahan :
Meni besi Kg 0.2000 17,500.00 3,500.00 -
Cat besi avian Kg 0.2600 45,000.00 11,700.00 -
Ampelas bh 0.4000 2,500.00 1,000.00 -
Kwas 3" bh 0.0500 9,000.00 450.00
Tenaga Kerja :
Pekerja Oh 0.0700 85,000.00 - 5,950.00
Tukang Cat Oh 0.0090 125,000.00 - 1,125.00
Kepala Tukang Cat Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 16,650.00 8,285.00 24,935.00
Keuntungan 13.00% 13.00% 3,241.55
Jumlah 28,176.55
Dibulatkan 28,170.00
4 1 M2 PENGECATAN BIDANG TEMBOK BARU, 2X LAPIS PENUTUP
Bahan :
Dempul Tembok(plamuur) Kg 0.1000 9,000.00 900.00 -
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Ampelas bh 0.3333 2,500.00 833.25
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Cat Oh 0.0630 125,000.00 - 7,875.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 10,967.25 11,825.50 22,792.75
Keuntungan 13.00% 13.00% 2,963.06
Jumlah 25,755.81
Dibulatkan 25,750.00
5 1 M2 PENGECATAN BIDANG TEMBOK LAMA, 2X LAPIS PENUTUP
Bahan :
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Cat Oh 0.0630 125,000.00 - 7,875.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 9,234.00 11,825.50 21,059.50
Keuntungan 13.00% 13.00% 2,737.74
Jumlah 23,797.24
Dibulatkan 23,790.00
19
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
6 1 M2 PENGECATAN BIDANG PLAPOND BARU, 2X LAPIS PENUTUP
Bahan :
Dempul Tembok (plamuur) Kg 0.1000 9,000.00 900.00 -
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Ampelas bh 0.3333 2,500.00 833.25
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Cat Oh 0.1260 125,000.00 - 15,750.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 10,967.25 24,800.50 35,767.75
Keuntungan 13.00% 13.00% 4,649.81
Jumlah 40,417.56
Dibulatkan 40,410.00
8 1 M2 MANY KAYU
Bahan :
Many kayu kg 0.1000 17,500.00 1,750.00
Kwas 3" bh 0.0250 9,000.00 225.00
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Mandor Oh 0.0060 160,000.00 - 960.00
Jumlah 1,975.00 9,460.00 11,435.00
Keuntungan 13.00% 13.00% 1,486.55
Jumlah 12,921.55
Dibulatkan 12,920.00
9 1 M2 LABURAN BIDANG KAYU DENGAN RESIDU DAN TER ( SNI. Edisi Rev. 2002 )
Bahan :
Residu atau Ter Ltr 0.3500 6,000.00 2,100.00
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Mandor Oh 0.0060 160,000.00 - 960.00
Jumlah 2,100.00 9,460.00 11,560.00
Keuntungan 13.00% 13.00% 1,502.80
Jumlah 13,062.80
Dibulatkan 13,060.00
20
DAFTAR RINCIAN ANALISA HARGA SATUAN PEKERJAAN
-
RUANG PRAKTIK SISWA ( RPS )
SMK ISLAM PANIIS KAB.TASIKMALAYA
21
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
5 1 M3 URUGAN PASIR ( SNI. Edisi Rev. 2008 )
Bahan :
Pasir urug M3 1.2000 190,000.00 228,000.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Mandor Oh 0.0100 160,000.00 - 1,600.00
Jumlah 228,000.00 27,100.00 255,100.00
Keuntungan 0.00% -
Jumlah 255,100.00
Dibulatkan 255,100.00
6 1 M3 URUGAN SIRTU ( SNI. Edisi Rev. 2008 )
Bahan :
Sirtu M3 1.2000 300,000.00 360,000.00 -
Tenaga Kerja :
Pekerja Oh 0.2500 85,000.00 - 21,250.00
Mandor Oh 0.0250 160,000.00 - 4,000.00
Jumlah 360,000.00 25,250.00 385,250.00
Keuntungan 0.00% -
Jumlah 385,250.00
Dibulatkan 385,250.00
C ANALISA BIAYA KONSTRUKSI PEKERJAAN PONDASI BATU KALI
1 1 M3 PASANGAN BATU KOSONG / AANSTAMPING ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah M3 1.2000 141,000.00 169,200.00 -
Pasir urug M3 0.4320 190,000.00 82,080.00 -
Tenaga Kerja :
Pekerja Oh 0.7800 85,000.00 - 66,300.00
Tukang Batu Oh 0.3900 95,000.00 - 37,050.00
Kepala Tukang Batu Oh 0.0390 105,000.00 - 4,095.00
Mandor Oh 0.0390 160,000.00 - 6,240.00
Jumlah 251,280.00 113,685.00 364,965.00
Keuntungan 0.00% -
Jumlah 364,965.00
Dibulatkan 364,960.00
2 1 M3 PASANGAN PONDASI BATU KALI, 1 PC. : 3 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah 15/20 cm M3 1.1000 141,000.00 155,100.00 -
Semen Portland Kg 202.0000 1,650.00 333,300.00 -
Pasir Pasang M3 0.4850 290,000.00 140,650.00 -
Tenaga Kerja :
Pekerja Oh 1.5000 85,000.00 - 127,500.00
Tukang Batu Oh 0.7500 95,000.00 - 71,250.00
Kepala Tukang Batu Oh 0.0750 105,000.00 - 7,875.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 629,050.00 218,625.00 847,675.00
Keuntungan 0.00% -
Jumlah 847,675.00
Dibulatkan 847,670.00
3 1 M3 PASANGAN PONDASI BATU KALI, 1 PC. : 5 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Batu Belah 15/20 cm M3 1.2000 141,000.00 169,200.00 -
Semen Portland Kg 136.0000 1,650.00 224,400.00 -
Pasir Pasang M3 0.5440 290,000.00 157,760.00 -
Tenaga Kerja :
Pekerja Oh 1.5000 85,000.00 - 127,500.00
Tukang Batu Oh 0.7500 95,000.00 - 71,250.00
Kepala Tukang Batu Oh 0.0750 105,000.00 - 7,875.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 551,360.00 218,625.00 769,985.00
Keuntungan 0.00% -
Jumlah 769,985.00
22
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
Dibulatkan 769,980.00
23
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
D ANALISA BIAYA KONSTRUKSI PEKERJAAN DINDING
1 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 3 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Bata Merah Bh 70.0000 1,000.00 70,000.00 -
Semen Portland Kg 14.3700 1,650.00 23,710.50 -
Pasir Pasang M3 0.0400 290,000.00 11,600.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1000 95,000.00 - 9,500.00
Kepala Tukang Batu Oh 0.0100 105,000.00 - 1,050.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 105,310.50 38,450.00 143,760.50
Keuntungan 0.00% -
Jumlah 143,760.50
Dibulatkan 143,760.00
2 1 M2 PASANGAN BATA MERAH TEBAL 1/2 BATA, 1 PC. : 5 PS. ( SNI. Edisi Rev. 2008 )
Bahan :
Bata Merah Bh 70.0000 1,000.00 70,000.00 -
Semen Portland Kg 9.6800 1,650.00 15,972.00 -
Pasir Pasang M3 0.0450 290,000.00 13,050.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1000 95,000.00 - 9,500.00
Kepala Tukang Batu Oh 0.0100 105,000.00 - 1,050.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 99,022.00 38,450.00 137,472.00
Keuntungan 0.00% -
Jumlah 137,472.00
Dibulatkan 137,470.00
E ANALISA BIAYA KONSTRUKSI PEKERJAAN PLESTERAN
1 1 M2 PLESTERAN DINDING 1 PC. : 3 PS; TEB. 15 MM ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 7.7760 1,650.00 12,830.40 -
Pasir Pasang M3 0.0230 290,000.00 6,670.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1500 95,000.00 - 14,250.00
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1,575.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 19,500.40 43,725.00 63,225.40
Keuntungan 0.00% -
Jumlah 63,225.40
Dibulatkan 63,220.00
2 1 M2 PLESTERAN DINDING 1 PC. : 5 PS; TEB. 15 MM ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 5.1840 1,650.00 8,553.60 -
Pasir Pasang M3 0.0260 290,000.00 7,540.00 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Batu Oh 0.1500 95,000.00 - 14,250.00
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1,575.00
Mandor Oh 0.0150 160,000.00 - 2,400.00
Jumlah 16,093.60 43,725.00 59,818.60
Keuntungan 0.00% -
Jumlah 59,818.60
Dibulatkan 59,810.00
24
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
3 1 M2 PLESTERAN SIAR PASANGAN BATU KALI, 1PC. : 2 PS, ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 6.3400 1,650.00 10461.0000 -
Pasir Pasang M3 0.0120 290,000.00 3480.0000 -
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25500.0000
Tukang Batu Oh 0.1500 95,000.00 - 14250.0000
Kepala Tukang Batu Oh 0.0150 105,000.00 - 1575.0000
Mandor Oh 0.0150 160,000.00 - 2400.0000
Jumlah 13,941.00 43,725.00 57,666.00
Keuntungan 0.00% -
Jumlah 57,666.00
Dibulatkan 57,660.00
F ANALISA BIAYA KONSTRUKSI PEKERJAAN BETON
1 1 M3 LANTAI KERJA BETON K-100 ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland kg 230.0000 1,650.00 379,500.00 -
Pasir beton m3 0.6400 390,000.00 249,600.00 -
Koral beton m3 0.7600 140,000.00 106,400.00 -
Air liter 200.0000 50.00 10,000.00
Tenaga Kerja :
Pekerja Oh 1.2000 85,000.00 - 102,000.00
Tukang Batu Oh 0.2000 95,000.00 - 19,000.00
Kepala Tukang Batu Oh 0.0200 105,000.00 - 2,100.00
Mandor Oh 0.0600 160,000.00 - 9,600.00
Jumlah 745,500.00 132,700.00 878,200.00
Keuntungan 0.00% -
Jumlah 878,200.00
Dibulatkan 878,200.00
2 1 M3 ADUKAN BETON K-175 ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 326.0000 1,650.00 537,900.00 -
Pasir Beton M3 0.5400 390,000.00 210,600.00 -
Koral Beton M3 0.7600 140,000.00 106,400.00 -
Air liter 215.0000 50.00 10,750.00
Tenaga Kerja :
Pekerja Oh 1.8500 85,000.00 - 157,250.00
Tukang Batu Oh 0.5700 95,000.00 - 54,150.00
Kepala Tukang Batu Oh 0.0430 105,000.00 - 4,515.00
Mandor Oh 0.1200 160,000.00 - 19,200.00
Jumlah 865,650.00 235,115.00 1,100,765.00
Keuntungan 0.00% -
Jumlah 1,100,765.00
Dibulatkan 1,100,760.00
3 1 M3 ADUKAN BETON K-225 ( SNI. Edisi Rev. 2008 )
Bahan :
Semen Portland Kg 371.0000 1,650.00 612,150.00 -
Pasir Beton M3 0.4990 390,000.00 194,610.00 -
Koral Beton M3 0.7760 140,000.00 108,640.00 -
Air liter 215.0000 50.00 10,750.00
Tenaga Kerja :
Pekerja Oh 1.8500 85,000.00 - 157,250.00
Tukang Batu Oh 0.5700 95,000.00 - 54,150.00
Kepala Tukang Batu Oh 0.0430 105,000.00 - 4,515.00
Mandor Oh 0.1200 160,000.00 - 19,200.00
Jumlah 926,150.00 235,115.00 1,161,265.00
Keuntungan 0.00% -
Jumlah 1,161,265.00
25
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
Dibulatkan 1,161,260.00
26
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 KG TULANGAN BETON DENGAN BESI POLOS / ULIR ( SNI. Edisi Rev. 2008 )
Bahan :
Besi Beton Polos Kg 1.0500 12,500.00 13,125.00 -
Kawat Beton kg 0.0150 17,000.00 255.00 -
Tenaga Kerja :
Pekerja Oh 0.0120 85,000.00 - 1,020.00
Tukang Besi Oh 0.0120 125,000.00 - 1,500.00
Kepala Tukang Besi Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 13,380.00 4,030.00 17,410.00
Keuntungan 0.00% -
Jumlah 17,410.00
Dibulatkan 17,410.00
5 1 M2.PASANG BEKISTING UNTUK SLOOF, RINGBALK DAN KUDA-KUDA BETON (SNI.Edisi Rev. 2008)
Bahan :
Kayu Papan/balok Albasia M3 0.0450 1,080,000.00 48,600.00 -
Paku Biasa 2" - 5" Kg 0.3000 15,000.00 4,500.00 -
Minyak Bekisting Lt 0.1000 3,000.00 300.00 -
Tenaga Kerja :
Pekerja Oh 0.5200 85,000.00 - 44,200.00
Tukang Kayu Oh 0.3600 125,000.00 - 45,000.00
Kepala Tukang Kayu Oh 0.0360 135,000.00 - 4,860.00
Mandor Oh 0.0360 160,000.00 - 5,760.00
Jumlah 53,400.00 99,820.00 153,220.00
Keuntungan 0.00% -
Jumlah 153,220.00
Dibulatkan 153,220.00
6 1 M2. PASANG BEKISTING UNTUK KOLOM ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu kls II M3 0.0150 1,080,000.00 16,200.00 -
Dolken dia 5/7 cm Btg 2.0000 13,500.00 27,000.00
Tenaga Kerja :
Pekerja Oh 0.7600 85,000.00 - 64,600.00
Tukang Kayu Oh 0.4300 125,000.00 - 53,750.00
Kepala Tukang Kayu Oh 0.0430 135,000.00 - 5,805.00
Mandor Oh 0.0430 160,000.00 - 6,880.00
Jumlah 93,000.00 131,035.00 224,035.00
Keuntungan 0.00% -
Jumlah 224,035.00
Dibulatkan 224,030.00
7 1 M2. PASANG BEKISTING UNTUK BALOK ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu Kls II M3 0.0180 1,080,000.00 19,440.00 -
Dolken dia 5/7 cm Btg 2.0000 13,500.00 27,000.00 -
Tenaga Kerja :
Pekerja Oh 0.7600 85,000.00 - 64,600.00
Tukang Kayu Oh 0.4300 125,000.00 - 53,750.00
Kepala Tukang Kayu Oh 0.0430 135,000.00 - 5,805.00
Mandor Oh 0.0430 160,000.00 - 6,880.00
Jumlah 96,240.00 131,035.00 227,275.00
Keuntungan 0.00% -
Jumlah 227,275.00
Dibulatkan 227,270.00
27
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
8 1 M2. PASANG BEKISTING UNTUK LANTAI ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu papan Albasia M3 0.0400 1,080,000.00 43,200.00 -
Paku Biasa 2" - 5" Kg 0.4000 15,000.00 6,000.00 -
Minyak Bekisting Lt 0.2000 3,000.00 600.00 -
Balok Kayu Kls II M3 0.0150 1,080,000.00 16,200.00 -
Plywood tebal 9 mm Lbr 0.3500 125,000.00 43,750.00 -
Dolken dia 5/7 cm Btg 6.0000 13,500.00 81,000.00 -
Tenaga Kerja :
Pekerja Oh 0.7600 85,000.00 - 64,600.00
Tukang Kayu Oh 0.4300 125,000.00 - 53,750.00
Kepala Tukang Kayu Oh 0.0430 135,000.00 - 5,805.00
Mandor Oh 0.0430 160,000.00 - 6,880.00
Jumlah 190,750.00 131,035.00 321,785.00
Keuntungan 0.00% -
Jumlah 321,785.00
Dibulatkan 321,780.00
9 1 M3 COR BETON COMPOSITE KOLOM STRUKTUR 15/20, K-175
Beton Site Mixed m3 1.0000 1,100,760.00 1,100,760.00
Bekisting (dipakai min 2 kali) m2 11.6667 224,030.00 2,613,683.33
Jumlah 3,714,443.33 - 3,714,443.33
Keuntungan 0.00% -
Jumlah 3,714,443.33
Dibulatkan 3,714,440.00
10 1 M3 COR BETON COMPOSITE KOLOM PENYANGGA 15/20, K-175
Beton Site Mixed m3 1.0000 1,100,760.00 1,100,760.00
Bekisting (dipakai min 2 kali) m2 23.3333 224,030.00 5,227,366.67
Jumlah 6,328,126.67 - 6,328,126.67
Keuntungan 0.00% -
Jumlah 6,328,126.67
Dibulatkan 6,328,120.00
G ANALISA BIAYA KONSTRUKSI PEKERJAAN KAYU
1 1 M3 PASANGAN KUSEN PINTU & JENDELA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok M3 1.1000 2,750,000.00 3,025,000.00 -
Paku Biasa 2" - 5" Kg 1.2500 15,000.00 18,750.00
lem putih ( FOX ) Kg 1.0000 17,500.00 17,500.00
Tenaga Kerja :
Pekerja Oh 7.0000 85,000.00 - 595,000.00
Tukang Kayu Oh 21.0000 125,000.00 - 2,625,000.00
Kepala Tukang Kayu Oh 2.1000 135,000.00 - 283,500.00
Mandor Oh 0.3500 160,000.00 - 56,000.00
Jumlah 3,061,250.00 3,559,500.00 6,620,750.00
Keuntungan 0.00% -
Jumlah 6,620,750.00
Dibulatkan 6,620,750.00
2 1 M3 PASANGAN KUSEN PINTU & JENDELA LAMA
Tenaga Kerja :
Pekerja Oh 7.0000 85,000.00 - 595,000.00
Tukang Kayu Oh 21.0000 125,000.00 - 2,625,000.00
Kepala Tukang Kayu Oh 2.1000 135,000.00 - 283,500.00
Mandor Oh 0.3500 160,000.00 - 56,000.00
Jumlah - 3,559,500.00 3,559,500.00
Keuntungan 0.00% -
Jumlah 3,559,500.00
Dibulatkan 3,559,500.00
3 1 M2 PASANGAN PINTU PANIL, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0400 2,750,000.00 110,000.00 -
lem putih ( FOX ) Kg 0.5000 17,500.00 8,750.00
Tenaga Kerja :
Pekerja Oh 1.0000 85,000.00 - 85,000.00
Tukang Kayu Oh 3.0000 125,000.00 - 375,000.00
Kepala Tukang Kayu Oh 0.3000 135,000.00 - 40,500.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah 118,750.00 508,500.00 627,250.00
Keuntungan 0.00% -
Jumlah 627,250.00
Dibulatkan 627,250.00
28
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 M2 PASANGAN PINTU PANIL LAMA
Tenaga Kerja :
Pekerja Oh 1.0000 85,000.00 - 85,000.00
Tukang Kayu Oh 3.0000 125,000.00 - 375,000.00
Kepala Tukang Kayu Oh 0.3000 135,000.00 - 40,500.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah - 508,500.00 508,500.00
Keuntungan 0.00% -
Jumlah 508,500.00
Dibulatkan 508,500.00
5 1 M2 PASANGAN PINTU PANIL & JENDELA KACA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0240 2,750,000.00 66,000.00 -
lem putih ( FOX ) Kg 0.3000 17,500.00 5,250.00
Tenaga Kerja :
Pekerja Oh 0.8000 85,000.00 - 68,000.00
Tukang Kayu Oh 2.4000 125,000.00 - 300,000.00
Kepala Tukang Kayu Oh 0.2400 135,000.00 - 32,400.00
Mandor Oh 0.0400 160,000.00 - 6,400.00
Jumlah 71,250.00 406,800.00 478,050.00
Keuntungan 0.00% -
Jumlah 478,050.00
Dibulatkan 478,050.00
7 1 M2 PASANGAN DAUN PINTU DOUBLE TRIPLEK
Bahan :
Rangka kayu kls II M3 0.0150 2,750,000.00 41,250.00 -
Triplek 4 mm Lbr 1.0200 50,000.00 51,000.00
Paku triplek Kg 0.2000 17,000.00 3,400.00
lem putih ( FOX ) Kg 0.5000 17,500.00 8,750.00
Tenaga Kerja :
Pekerja Oh 0.3000 85,000.00 - 25,500.00
Tukang Kayu Oh 1.3000 125,000.00 - 162,500.00
Kepala Tukang Kayu Oh 0.1300 135,000.00 - 17,550.00
Mandor Oh 0.0130 160,000.00 - 2,080.00
Jumlah 104,400.00 207,630.00 312,030.00
Keuntungan 0.00% -
Jumlah 312,030.00
Dibulatkan 312,030.00
29
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
8 1 M2 PASANGAN JALUSI KUSEN KAYU KELAS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Papan M3 0.0600 2,750,000.00 165,000.00 -
Paku biasa 1" - 2" Kg 0.1500 17,000.00 2,550.00 -
Tenaga Kerja :
Pekerja Oh 0.6700 85,000.00 - 56,950.00
Tukang Kayu Oh 2.0000 125,000.00 - 250,000.00
Kepala Tukang Kayu Oh 0.2000 135,000.00 - 27,000.00
Mandor Oh 0.3350 160,000.00 - 53,600.00
Jumlah 167,550.00 387,550.00 555,100.00
Keuntungan 0.00% -
Jumlah 555,100.00
Dibulatkan 555,100.00
9 1 M3 PASANG KONSTRUKSI KUDA-KUDA, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok M3 1.1000 2,750,000.00 3,025,000.00 -
Besi strip Kg 15.0000 8,500.00 127,500.00 -
Paku biasa 2" - 5" Kg 5.6000 15,000.00 84,000.00 -
Tenaga Kerja :
Pekerja Oh 4.0000 85,000.00 - 340,000.00
Tukang Kayu Oh 12.0000 125,000.00 - 1,500,000.00
Kepala Tukang Kayu Oh 1.2000 135,000.00 - 162,000.00
Mandor Oh 0.2000 160,000.00 - 32,000.00
Jumlah 3,236,500.00 2,034,000.00 5,270,500.00
Keuntungan 0.00% -
Jumlah 5,270,500.00
Dibulatkan 5,270,500.00
12 1 M3 PASANG KONSTRUKSI GORDENG, KAYU LAMA
Bahan :
Besi strip Kg 15.0000 8,500.00 127,500.00 -
Paku biasa 2" - 5" Kg 3.0000 15,000.00 45,000.00 -
Tenaga Kerja :
Pekerja Oh 2.4000 85,000.00 - 204,000.00
Tukang Kayu Oh 7.2000 125,000.00 - 900,000.00
Kepala Tukang Kayu Oh 0.7200 135,000.00 - 97,200.00
Mandor Oh 0.1200 160,000.00 - 19,200.00
Jumlah 172,500.00 1,220,400.00 1,392,900.00
Keuntungan 0.00% -
Jumlah 1,392,900.00
Dibulatkan 1,392,900.00
30
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
13 1 M2 PASANG RANGKA ATAP KASO + RENG, GENTENG KERAMIK KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kaso-kaso 5/7 cm, Kayu Kelas II M3 0.0140 2,000,000.00 28,000.00 -
Reng 2/3 cm M3 0.0036 2,000,000.00 7,200.00
Paku biasa 2" - 5" Kg 0.2500 15,000.00 3,750.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 38,950.00 23,150.00 62,100.00
Keuntungan 0.00% -
Jumlah 62,100.00
Dibulatkan 62,100.00
14 1 M2 RENG KLS II
Bahan :
Reng 2/3 cm M3 0.0036 2,000,000.00 7,200.00
Paku biasa 2" - 5" Kg 0.1250 15,000.00 1,875.00 -
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Kayu Oh 0.0800 125,000.00 - 10,000.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 9,075.00 17,875.00 26,950.00
Keuntungan 0.00% -
Jumlah 26,950.00
Dibulatkan 26,950.00
15 1 M2 PAS. KASO KAYU KLS II
Bahan :
Kaso-kaso 5/7 cm, Kayu Kelas II M3 0.0140 2,000,000.00 28,000.00 -
Paku biasa 2" - 5" Kg 0.1250 15,000.00 1,875.00 -
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Kayu Oh 0.0800 125,000.00 - 10,000.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 29,875.00 17,875.00 47,750.00
Keuntungan 0.00% -
Jumlah 47,750.00
Dibulatkan 47,750.00
16 1 M2 PAS. KASO LAMA
Bahan :
Paku biasa 2" - 5" Kg 0.1250 15,000.00 1,875.00 -
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Kayu Oh 0.0800 125,000.00 - 10,000.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 1,875.00 17,875.00 19,750.00
Keuntungan 0.00% -
Jumlah 19,750.00
Dibulatkan 19,750.00
17 1 M2 PASANG RANGKA LANGIT-LANGIT 50 x 100 CM, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Kls II, Balok 5/7 M3 0.0154 2,000,000.00 30,800.00 -
Paku biasa 2" - 5" Kg 0.2000 15,000.00 3,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.3000 125,000.00 - 37,500.00
Kepala Tukang Kayu Oh 0.0300 135,000.00 - 4,050.00
Mandor Oh 0.0750 160,000.00 - 12,000.00
Jumlah 33,800.00 66,300.00 100,100.00
Keuntungan 0.00% -
Jumlah 100,100.00
Dibulatkan 100,100.00
31
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
18 1 M2 PASANG RANGKA LANGIT-LANGIT 50 x 100 CM, KAYU LAMA
Bahan :
Paku biasa 2" - 5" Kg 0.2000 15,000.00 3,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 125,000.00 - 18,750.00
Tukang Kayu Oh 0.3000 - - -
Kepala Tukang Kayu Oh 0.0300 1,050,000.00 - 31,500.00
Mandor Oh 0.0750 - - -
Jumlah 3,000.00 50,250.00 53,250.00
Keuntungan 0.00% 5,325.00
Jumlah 58,575.00
Dibulatkan 58,570.00
19 1 M2 PASANG LISTPLANK 3 x 30 CM, KAYU KLS II ( SNI. Edisi Rev. 2008 )
Bahan :
Kayu Papan Kls II M3 0.0110 2,000,000.00 22,000.00 -
Paku biasa 2" - 5" Kg 0.0500 15,000.00 750.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 22,750.00 37,000.00 59,750.00
Keuntungan 0.00% -
Jumlah 59,750.00
Dibulatkan 59,750.00
20 1 M2 PASANG LISTPLANK 3 x 30 CM, KAYU LAMA
Bahan :
Paku biasa 2" - 5" Kg 0.0500 35,500.00 1,775.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 1,775.00 37,000.00 38,775.00
Keuntungan 0.00% -
Jumlah 38,775.00
Dibulatkan 38,770.00
21 1 M1 PASANG PAPAN RUITER
Bahan :
Kayu kls II, Papan M3 0.0043 2,750,000.00 11,825.00 -
Paku biasa 2" - 5" Kg 0.0300 15,000.00 450.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0500 160,000.00 - 8,000.00
Jumlah 12,275.00 30,350.00 42,625.00
Keuntungan 0.00% -
Jumlah 42,625.00
Dibulatkan 42,620.00
32
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
H ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP ATAP
1 1 M2 PASANG ATAP GENTENG PALENTONG EX JATIWANGI ( SNI. Edisi Rev. 2002 )
Bahan :
Genteng Palentong Ex Jatiwangi Bh 25.0000 2,600.00 65,000.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.0600 125,000.00 - 7,500.00
Kepala Tukang Kayu Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0080 160,000.00 - 1,280.00
Jumlah 65,000.00 22,340.00 87,340.00
Keuntungan 0.00% -
Jumlah harga 87,340.00
Dibulatkan 87,340.00
2 1 M2 PASANG ATAP GENTENG PALENTONG LAMA
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.0600 125,000.00 - 7,500.00
Kepala Tukang Kayu Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0080 160,000.00 - 1,280.00
Jumlah - 22,340.00 22,340.00
Keuntungan 0.00% -
Jumlah harga 22,340.00
Dibulatkan 22,340.00
3 1 M1 PASANG GENTENG BUBUNG PALENTONG EX JATIWANGI ( SNI. Edisi Rev. 2002 )
Bahan :
Genteng Bubung Palentong Ex Ja Bh 4.0000 4,750.00 19,000.00 -
Semen Portland Kg 8.0000 1,650.00 13,200.00 -
Pasir Pasang M3 0.0320 290,000.00 9,280.00 -
Tenaga Kerja :
Pekerja Oh 0.4000 85,000.00 - 34,000.00
Tukang Batu Oh 0.2000 95,000.00 - 19,000.00
Kepala Tukang Batu Oh 0.0200 105,000.00 - 2,100.00
Mandor Oh 0.0020 160,000.00 - 320.00
Jumlah 41,480.00 55,420.00 96,900.00
Keuntungan 0.00% -
Jumlah harga 96,900.00
Dibulatkan 96,900.00
I ANALISA BIAYA KONSTRUKSI PEKERJAAN LANGIT - LANGIT
1 1 M2 LANGIT - LANGIT GRC, T = 4 MM ( SNI Edisi Rev. 2008 )
Bahan :
GRC Lbr 0.3750 55,000.00 20,625.00 -
Paku 1/2" - 1" Kg 0.0300 15,000.00 450.00 -
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 21,075.00 23,150.00 44,225.00
Keuntungan 0.00% -
Jumlah 44,225.00
Dibulatkan 44,220.00
J ANALISA BIAYA INSTALASI AIR KOTOR
1 1 M' PEKERJAAN SALURAN AIR HUJAN DARI PAS BATA + PLESTERAN DAN ACIAN
Pek.Galian tanah m3 0.1500 67,750.00 10,162.50 -
Pas. Bata 1:3 m2 0.4000 143,760.00 57,504.00 -
Plesteran 1:3 + Acian m2 0.4000 63,220.00 25,288.00
Jumlah 92,954.50 - 92,954.50
Dibulatkan 92,950.00
33
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
K ANALISA BIAYA KONSTRUKSI PEKERJAAN BESI DAN ALUMINIUM
1 1 M' PASANG TALANG MIRING, SENG BJLS 30 ( SNI. Edisi Rev. 2002 )
Bahan :
Seng Plat BJLS 30 Lbr 0.5000 36,000.00 18,000.00 -
Paku biasa 1/2" - 1" Kg 0.0150 17,000.00 255.00 -
Kayu kls II, Papan M3 0.0190 2,750,000.00 52,250.00 -
Flincote / Meni Besi Kg 0.3000 17,500.00 5,250.00 -
Tenaga Kerja :
Pekerja Oh 0.0400 85,000.00 - 3,400.00
Tukang Kayu Oh 0.4000 125,000.00 - 50,000.00
Kepala Tukang Kayu Oh 0.0250 135,000.00 - 3,375.00
Mandor Oh 0.00125 160,000.00 - 200.00
Jumlah 75,755.00 56,975.00 132,730.00
Keuntungan 0.00% -
Jumlah 132,730.00
Dibulatkan 132,730.00
2 1 M' PASANG PLASING SENG
Bahan :
Seng Plat BJLS 30 Lbr 0.5000 36,000.00 18,000.00 -
Paku biasa 1/2" - 1" Kg 0.0150 17,000.00 255.00 -
Tenaga Kerja :
Pekerja Oh 0.1500 85,000.00 - 12,750.00
Tukang Kayu Oh 0.4000 125,000.00 - 50,000.00
Kepala Tukang Kayu Oh 0.0250 135,000.00 - 3,375.00
Mandor Oh 0.00125 160,000.00 - 200.00
Jumlah 18,255.00 66,325.00 84,580.00
Keuntungan 0.00% -
Jumlah 84,580.00
Dibulatkan 84,580.00
L ANALISA BIAYA KONSTRUKSI PEKERJAAN KUNCI DAN KACA
1 1 BUAH PASANG KUNCI 2 SLAAG ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci 2 Slaag (Merk Kuda terbang) Bh 1.0000 95,000.00 95,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0100 85,000.00 - 850.00
Tukang Kayu Oh 0.5000 125,000.00 - 62,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0050 160,000.00 - 800.00
Jumlah 95,000.00 65,500.00 160,500.00
Keuntungan 0.00% -
Jumlah 160,500.00
Dibulatkan 160,500.00
2 1 BUAH PASANG KUNCI TANAM KAMAR MANDI ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci Tanam Kamar Mandi (Merk A Bh 1.0000 75,000.00 75,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0050 85,000.00 - 425.00
Tukang Kayu Oh 0.5000 125,000.00 - 62,500.00
Kepala Tukang Kayu Oh 0.0050 135,000.00 - 675.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 75,000.00 64,000.00 139,000.00
Keuntungan 0.00% -
Jumlah 139,000.00
Dibulatkan 139,000.00
34
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
4 1 BUAH PASANG ENGSEL JENDELA KUPU-KUPU ( SNI. Edisi Rev. 2002 )
Bahan :
Engsel Jendela Bh 1.0000 4,800.00 4,800.00 -
Tenaga Kerja :
Pekerja Oh 0.0100 85,000.00 - 850.00
Tukang Kayu Oh 0.1000 125,000.00 - 12,500.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0005 160,000.00 - 80.00
Jumlah 4,800.00 14,780.00 19,580.00
Keuntungan 0.00% -
Jumlah 19,580.00
Dibulatkan 19,580.00
5 1 PASANG ESPANYOLET PADA PINTU DOUBLE
Bahan :
Espanyolet ps 1.0000 35,000.00 35,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0100 135,000.00 - 1,350.00
Tukang Kayu Oh 0.5000 160,000.00 - 80,000.00
Kepala Tukang Kayu Oh 0.0100 135,000.00 - 1,350.00
Mandor Oh 0.0005 160,000.00 - 80.00
Jumlah 35,000.00 82,780.00 117,780.00
Keuntungan maksimal 10%
Jumlah 117,780.00
Dibulatkan 117,780.00
6 1 BUAH PASANG KAIT ANGIN ( SNI. Edisi Rev. 2002 )
Bahan :
Kait Angin type sendok Bh 1.0000 7,500.00 7,500.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 7,500.00 22,170.00 29,670.00
Keuntungan 0.00% -
Jumlah 29,670.00
Dibulatkan 29,670.00
7 1 BUAH PASANG KUNCI SELOT ( SNI. Edisi Rev. 2002 )
Bahan :
Kunci Selot Bh 1.0000 5,000.00 5,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 5,000.00 29,560.00 34,560.00
Keuntungan 0.00% -
Jumlah 34,560.00
Dibulatkan 34,560.00
8 1 BUAH PASANG SELOT JENDELA
Bahan :
Selot Jendela Bh 1.0000 6,000.00 6,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 6,000.00 29,560.00 35,560.00
Keuntungan 0.00% -
Jumlah 35,560.00
Dibulatkan 35,560.00
35
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
9 1 BUAH PASANG TARIKAN JENDELA
Bahan :
Tarikan Jendela Bh 1.0000 7,500.00 7,500.00 -
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Kayu Oh 0.2000 125,000.00 - 25,000.00
Kepala Tukang Kayu Oh 0.0200 135,000.00 - 2,700.00
Mandor Oh 0.0010 160,000.00 - 160.00
Jumlah 7,500.00 29,560.00 37,060.00
Keuntungan 0.00% -
Jumlah 37,060.00
Dibulatkan 37,060.00
10 1 M2 PASANGAN KACA, T = 3 MM ( SNI. Edisi Rev. 2002 )
Bahan :
Kaca 3 mm(Asahi) Bh 1.1000 35,500.00 39,050.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 39,050.00 22,170.00 61,220.00
Keuntungan 0.00% -
Jumlah 61,220.00
Dibulatkan 61,220.00
11 1 M2 PASANGAN KACA, T = 5 MM ( SNI. Edisi Rev. 2002 )
Bahan :
Kaca 5 mm(Asahi) M2 1.1000 150,000.00 165,000.00 -
Tenaga Kerja :
Pekerja Oh 0.0150 85,000.00 - 1,275.00
Tukang Kayu Oh 0.1500 125,000.00 - 18,750.00
Kepala Tukang Kayu Oh 0.0150 135,000.00 - 2,025.00
Mandor Oh 0.0008 160,000.00 - 120.00
Jumlah 165,000.00 22,170.00 187,170.00
Keuntungan 0.00% -
Jumlah 187,170.00
Dibulatkan 187,170.00
M ANALISA BIAYA KONSTRUKSI PEKERJAAN PENUTUP LANTAI
1 1 M2 PASANGAN LANTAI KERAMIK , UK. 30x 30 CM ( SNI. Edisi Rev. 2002 )
Bahan :
Ubin Keramik, uk. 30 x 30 cm Muly Bh 11.8700 6,318.45 75,000.00 -
Semen Portland Kg 11.3800 1,650.00 18,777.00 -
Pasir Pasang M3 0.0420 290,000.00 12,180.00 -
Semen Warna ( putih ) Kg 1.5000 3,500.00 5,250.00 -
Tenaga Kerja :
Pekerja Oh 0.6200 85,000.00 - 52,700.00
Tukang Batu Oh 0.3500 95,000.00 - 33,250.00
Kepala Tukang Batu Oh 0.0350 105,000.00 - 3,675.00
Mandor Oh 0.0300 160,000.00 - 4,800.00
Jumlah 111,207.00 94,425.00 205,632.00
Keuntungan 0.00% -
Jumlah 205,632.00
Dibulatkan 205,630.00
36
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff.
Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
N ANALISA BIAYA KONSTRUKSI PEKERJAAN PENGECATAN
1 1 M2 PENGECATAN BIDANG KAYU BARU, 2X LAPIS PENUTUP
Bahan :
Cat Meni Kg 0.2000 17,500.00 3,500.00 -
Dempul Kayu(cap kucing) Kg 0.1500 22,500.00 3,375.00 -
Cat Kayu(Avian) Penutup, 2x Kg 0.2600 45,000.00 11,700.00 -
Ampelas bh 0.4000 2,500.00 1,000.00 -
Kwas 3" bh 0.0500 9,000.00 450.00
Tenaga Kerja :
Pekerja Oh 0.0700 85,000.00 - 5,950.00
Tukang Cat Oh 0.0090 125,000.00 - 1,125.00
Kepala Tukang Cat Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 20,025.00 8,285.00 28,310.00
Keuntungan 0.00% -
Jumlah 28,310.00
Dibulatkan 28,310.00
3 1 M2 PENGECATAN BIDANG BESI BARU, 2X LAPIS PENUTUP
Bahan :
Meni besi Kg 0.2000 17,500.00 3,500.00 -
Cat besi avian Kg 0.2600 45,000.00 11,700.00 -
Ampelas bh 0.4000 2,500.00 1,000.00 -
Kwas 3" bh 0.0500 9,000.00 450.00
Tenaga Kerja :
Pekerja Oh 0.0700 85,000.00 - 5,950.00
Tukang Cat Oh 0.0090 125,000.00 - 1,125.00
Kepala Tukang Cat Oh 0.0060 135,000.00 - 810.00
Mandor Oh 0.0025 160,000.00 - 400.00
Jumlah 16,650.00 8,285.00 24,935.00
Keuntungan 0.00% -
Jumlah 24,935.00
Dibulatkan 24,930.00
4 1 M2 PENGECATAN BIDANG TEMBOK BARU, 2X LAPIS PENUTUP
Bahan :
Dempul Tembok(plamuur) Kg 0.1000 9,000.00 900.00 -
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Ampelas bh 0.3333 2,500.00 833.25
Tenaga Kerja :
Pekerja Oh 0.0400 85,000.00 - 3,400.00
Tukang Cat Oh 0.0650 125,000.00 - 8,125.00
Kepala Tukang Cat Oh 0.0065 135,000.00 - 877.50
Mandor Oh 0.0030 160,000.00 - 480.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 10,967.25 13,882.50 24,849.75
Keuntungan 0.00% -
Jumlah 24,849.75
Dibulatkan 24,840.00
37
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
5 1 M2 PENGECATAN BIDANG TEMBOK LAMA, 2X LAPIS PENUTUP
Bahan :
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Tenaga Kerja :
Pekerja Oh 0.0200 85,000.00 - 1,700.00
Tukang Cat Oh 0.0630 125,000.00 - 7,875.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 9,234.00 11,825.50 21,059.50
Keuntungan 0.00% -
Jumlah 21,059.50
Dibulatkan 21,050.00
6 1 M2 PENGECATAN BIDANG PLAPOND BARU, 2X LAPIS PENUTUP
Bahan :
Dempul Tembok (plamuur) Kg 0.1000 9,000.00 900.00 -
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Ampelas bh 0.3333 2,500.00 833.25
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Cat Oh 0.1260 125,000.00 - 15,750.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 10,967.25 24,800.50 35,767.75
Keuntungan 0.00% -
Jumlah 35,767.75
Dibulatkan 35,760.00
7 1 M2 PENGECATAN BIDANG PLAPOND LAMA, 2X LAPIS PENUTUP
Bahan :
Cat (Sanlex)Penutup, 2x Kg 0.2600 35,000.00 9,100.00 -
Rol cat bh 0.0067 20,000.00 134.00
Tenaga Kerja :
Pekerja Oh 0.0800 85,000.00 - 6,800.00
Tukang Cat Oh 0.1260 125,000.00 - 15,750.00
Kepala Tukang Cat Oh 0.0063 135,000.00 - 850.50
Mandor Oh 0.0025 160,000.00 - 400.00
Steger Werk ls 1.0000 1,000.00 - 1,000.00
Jumlah 9,234.00 24,800.50 34,034.50
Keuntungan 0.00% -
Jumlah 34,034.50
Dibulatkan 34,030.00
8 1 M2 MANY KAYU
Bahan :
Many kayu kg 0.1000 17,500.00 1,750.00
Kwas 3" bh 0.0250 9,000.00 225.00
Tenaga Kerja :
Pekerja Oh 0.1000 85,000.00 - 8,500.00
Mandor Oh 0.0060 160,000.00 - 960.00
Jumlah 1,975.00 9,460.00 11,435.00
Keuntungan 0.00% -
Jumlah 11,435.00
Dibulatkan 11,430.00
38
Harga Sat. Jumlah Harga Jumlah Harga
No. Uraian Jenis Pekerjaan Sat. Koeff. Bahan / Upah Bahan Upah Bahan + Upah
Rp. Rp. Rp. Rp.
1 2 3 4 5 6 7 8
39
DAFTAR ANALISA BETON
HARGA TULANGAN CETAKAN + PERANCAH TOTAL
SATUAN
NO. URAIAN SATUAN BETON / M3 KG/M3 HARGA/KG JUMLAH M2 HARGA/M2 JUMLAH JUMLAH DIBULATKAN
dari Analisa dari Analisa dari Analisa
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
a b c d e f g=(exf) h i j = (hxi) n =(d+g+j+m) o
1 Pek. pas. pondasi plat beton bertulang K-225 m3 1,161,260 110.09 17,410.00 1,916,666.90 - - 3,077,926.90 3,077,920.00
2 Pek. Kolom beton pedestral 25/35 cm, K-225 m3 1,161,260 196.46 17,410.00 3,420,368.60 13.71 224,030.00 3,071,451.30 7,653,079.90 7,653,070.00
3 Pek. Kolom beton pedestral 25/25 cm, K-225 m3 1,161,260 163.88 17,410.00 2,853,150.80 18.00 224,030.00 4,032,540.00 8,046,950.80 8,046,950.00
4 Pek. sloof beton 15/20 cm , K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 13.33 153,220.00 2,042,422.60 5,957,509.10 5,957,500.00
5 Pek. kolom beton 25/35 cm (K1), K-225 m3 1,161,260 196.46 17,410.00 3,420,368.60 13.71 224,030.00 3,071,451.30 7,653,079.90 7,653,070.00
6 Pek. kolom beton 25/25 cm (K2), K-225 m3 1,161,260 163.88 17,410.00 2,853,150.80 18.00 224,030.00 4,032,540.00 8,046,950.80 8,046,950.00
7 Pek. kolom beton 12/12 cm (KP), K-175 m3 1,100,760 206.31 17,410.00 3,591,857.10 16.67 224,030.00 3,734,580.10 8,427,197.20 8,427,190.00
8 Pek. kolom beton pada dinding15/20 cm , K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 13.33 224,030.00 2,986,319.90 6,901,406.40 6,901,400.00
9 Pek. kolom beton selasar 15/20 cm , K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 23.33 224,030.00 5,226,619.90 9,141,706.40 9,141,700.00
10 Pek. Balok Beton 25/70 cm (B1), K-225 m3 1,161,260 190.00 17,410.00 3,307,900.00 8.06 227,270.00 1,831,796.20 6,300,956.20 6,300,950.00
11 Pek. Balok Beton 25/70 cm (B2), K-225 m3 1,161,260 163.61 17,410.00 2,848,450.10 8.06 227,270.00 1,831,796.20 5,841,506.30 5,841,500.00
12 Pek. Balok Beton 20/35 cm (B3), K-225 m3 1,161,260 153.32 17,410.00 2,669,301.20 9.43 227,270.00 2,143,156.10 5,973,717.30 5,973,710.00
13 Pek. Balok Beton 25/35 cm (B4), K-225 m3 1,161,260 125.14 17,410.00 2,178,687.40 8.11 227,270.00 1,843,159.70 5,183,107.10 5,183,100.00
14 Pek. Balok Beton 20/30 cm (B5), K-225 m3 1,161,260 185.39 17,410.00 3,227,639.90 9.33 227,270.00 2,120,429.10 6,509,329.00 6,509,320.00
15 Pek. plat lantai tbl. 12 cm, K-225 m3 1,161,260 144.83 17,410.00 2,521,490.30 8.33 321,780.00 2,680,427.40 6,363,177.70 6,363,170.00
16 Pek. Listplank beton tbl. 10 cm, K-175 m3 1,100,760 86.90 17,410.00 1,512,929.00 10.00 227,270.00 2,272,700.00 4,886,389.00 4,886,380.00
17 Pek. balok lintel 11/11 cm, K-175 m3 1,100,760 262.15 17,410.00 4,564,031.50 18.18 227,270.00 4,131,768.60 9,796,560.10 9,796,560.00
18 Pek. Ringbalk beton 15/20, K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 13.33 227,270.00 3,029,509.10 6,944,595.60 6,944,590.00
19 Pek. Balk beton selasar 15/20, K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 18.33 227,270.00 4,165,859.10 8,080,945.60 8,080,940.00
20 Pek. Konsol beton 15/20, K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 18.33 227,270.00 4,165,859.10 8,080,945.60 8,080,940.00
21 Pek. Kuda - kuda beton 15/20, K-175 m3 1,100,760 161.65 17,410.00 2,814,326.50 13.33 153,220.00 2,042,422.60 5,957,509.10 5,957,500.00
Garut,……………………... 2012
Konsultan Perencana
CV. ………………………..
………………………
HARGA TULANGAN CETAKAN + PERANCAH TOTAL
SATUAN
NO. URAIAN SATUAN BETON / M3 KG/M3 HARGA/KG JUMLAH M2 HARGA/M2 JUMLAH JUMLAH DIBULATKAN
dari Analisa dari Analisa dari Analisa
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.)
a b c d e f g=(exf) h i j = (hxi) n =(d+g+j+m) o
Direktur
DAFTAR HARGA SATUAN PEKERJAAN
-
RUANG PRAKTIK SISWA ( RPS )
SMK ISLAM PANIIS KAB TASIKMALAYA
JUMLAH HARGA
NO. URAIAN JENIS PEKERJAAN SAT BAHAN+UPAH
Rp.
1 2 3 4
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. HARGA
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 0.63 m2 203,410.00 128,148.30
2 Pas. Bouwplank m1 43,970.00 -
3 Pengadaan Air Kerja 1.00 ls 150,000.00 150,000.00
4 Mobilisasi Bahan 1.00 ls 500,000.00 500,000.00
778,148.30
B. PEKERJAAN REHABILITASI / PEMBANGUNAN RUANG KELAS ( …..RKB )
I. PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi batu belah 37.50 m3 67,750.00 2,540,625.00
2 Galian tanah pondasi batu belah selasar 1.36 m3 67,750.00 91,869.00
3 Urugan tanah kembali 9.71 m3 22,570.00 219,244.98
4 Urugan pasir bawah pondasi bt. kali (t. 10 cm) 1.66 m3 255,100.00 422,522.13
5 Urugan pasir bawah lantai (t. 5 cm) 1.38 m3 255,100.00 352,707.64
6 Urugan tanah peninggian lantai (t. 20 cm) tanah urug disekitar lokasi 16.68 m3 50,500.00 842,403.13
7 Pemadatan Tanah Sekitar Lokasi m3 50,500.00 -
4,469,371.87
II. PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) 4.50 m3 364,960.00 1,642,320.00
2 Pas. pondasi batu belah 1 : 5 11.11 m3 769,980.00 8,551,397.88
3 Pas. pondasi batu belah 1 : 3 3.60 m3 847,670.00 3,051,612.00
4 Pas. bata merah trasraam 1 : 3 8.16 m2 143,760.00 1,173,081.60
5 Pas. bata merah biasa 1 : 5 85.14 m2 137,470.00 11,704,127.07
6 Pas. bata merah biasa 1 : 5 1 bata (tempat duduk depan selasar ) 3.02 m2 287,360.00 868,976.64
7 Plesteran + Acian dinding & Plesteran Beton 1: 3 55.98 m2 63,220.00 3,538,739.50
8 Plester & Acian dinding 1: 5 176.33 m2 59,810.00 10,546,117.87
9 Pas. Neut kusen 2.00 bh 2,000.00 4,000.00
10 Tali Air Kusen 31.75 m1 1,000.00 31,750.00
41,112,122.56
III. PEKERJAAN BETON
1 Cor Beton Composite 15/20 K-175 m3 3,714,440.00 -
2 Sloof beton 15/20 , K - 175 0.85 m3 5,957,500.00 5,037,542.85
3 Kolom struktur 15/20, K- 175 0.55 m3 6,901,400.00 3,829,448.83
4 Kolom struktur pada selasar 15/20, K- 175 0.20 m3 9,141,700.00 1,827,608.66
5 Kolom praktis 12/12 K - 175 0.13 m3 8,427,190.00 1,065,870.99
6 Ring balk 15/20 , K -175 0.43 m3 6,944,590.00 3,000,062.88
7 Balok selasar 15/20 , K -175 0.16 m3 8,080,940.00 1,294,081.73
8 Konsol beton 15/20, K -175 0.22 m3 8,080,940.00 1,813,362.94
9 Kuda - kuda beton 15/20 , K -175 0.19 m3 5,957,500.00 1,146,699.60
19,014,678.48
IV. PEKERJAAN KUSEN PINTU/JENDELA
1 Pek. Kusen , Pintu dan Jendela 5/14 kayu Kls II 0.53 m3 6,620,750.00 3,518,928.63
2 Pek. Kusen , Pintu dan Jendela 5/14 kayu Lama 0.53 m3 3,559,500.00 1,891,874.25
3 Pek. Kusen Partisi 5/14 kayu Kls II 0.20 m3 6,620,750.00
4 Daun pintu Panil Kayu rangka kayu kls II 2.57 m2 627,250.00 1,614,666.95
5 Daun jendela kaca rangka kayu Hutan Kls II 2.33 m2 478,050.00 1,114,621.38
6 Pas. Daun Partisi Rangka kayu Hutan Kls II 233,750.00
7 Daun Pintu Double Triplek Rangka kayu Hutan Kls II 312,030.00
8 Pek. Kusen Ampig 6,620,750.00
9 Angkur Kusen dia 8 mm 68.00 bh 1,500.00 102,000.00
8,242,091.21
1 2 3 4 5 6
V. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu 8/12 Kls II 0.95 m3 5,270,500.00 5,006,975.00
2 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu Lama 0.95 m3 2,245,500.00 2,133,225.00
3 Pas. Balok Gordeng , Nok Kayu 8/12 Kls II 0.87 m3 4,417,900.00 3,843,573.00
4 Pas. Balok Gordeng , Nok Kayu Lama 0.87 m3 1,392,900.00 1,211,823.00
5 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu 6/12 Kls II 0.69 m3 4,417,900.00 3,048,351.00
6 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu Lama 0.69 m3 1,392,900.00 961,101.00
7 Pas. Reng 2/3 dan kaso Kayu 5/7 Kls II 119.20 m2 62,100.00 7,402,320.00
8 Pas. Kaso Kayu Lama 119.20 m2 19,750.00 2,354,200.00
9 Pas. Reng 2/3 Kayu 5/7 Kls II 119.20 m2 26,950.00 3,212,440.00
10 Pas. Genteng Palentong 119.20 m2 87,340.00 10,410,928.00
11 Pas. Genteng Palentong Lama 119.20 m2 22,340.00 2,662,928.00
12 Pas. Bubungan genteng Palentong 10.00 m1 96,900.00 969,000.00
13 Pas. Papan Ruiter 10.00 m1 42,620.00 426,200.00
14 Pekerjaan pasang lisplank 2,5/28 kayu Kls II 44.24 m1 59,750.00 2,643,340.00
15 Pekerjaan pasang lisplank kayu Lama 44.24 m1 38,770.00 1,715,184.80
15 Pekerjaan pasang papan jalusi ampig kayu kls II 2.10 m2 555,100.00 1,165,710.00
16 Pas. Plasing seng 23.84 m1 84,580.00 2,016,387.20
17 Pas. Plat Besi Aisan Sudut, Tengah 50.5 12.00 bh 5,000.00 60,000.00
18 Pas. Plat Besi Penguat Kuda-kuda 50.5 6.00 bh 2,000.00 12,000.00
19 Pas. Mur Baud dia 12 mm 28.00 bh 2,000.00 56,000.00
20 Pas. Angker 8.00 bh 1,500.00 12,000.00
51,323,686.00
PEKERJAAN KUDA-KUDA DAN ATAP
Pas. Rangka Atap Baja Ringan m2 139,100.00 -
Pas. Genteng Palentong m2 87,340.00 -
Pas. Bubungan genteng Palentong m1 96,900.00 -
Pekerjaan pasang lisplank 2,5/28 kayu Kls II m1 59,750.00 -
Pekerjaan pasang papan jalusi ampig kayu kls II m2 555,100.00 -
Pas. Plasing seng m1 84,580.00 -
-
VI. PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 5/10, 5/7 ky Kls II 101.03 m2 100,100.00 10,112,602.50
Rangka Plafond Kayu Lama 101.03 m2 58,570.00 5,917,034.25
Pas. Plafond Eternit t = 4mm m2 22,950.00 -
2 Pas. Plafond GRC t = 4mm 101.03 m2 44,220.00 4,467,325.50
3 Pas. List Plapond 75.49 m1 13,640.00 1,029,683.60
21,526,645.85
VII. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik 30 x30 cm dlm ruangan sek. MULIA (Putih Polos ) 53.77 m2 205,630.00 11,057,239.18
2 Pas. Lantai Keramik 30 x30 cm untuk selasar sekualitas MULIA (Putih Po 14.55 m2 205,630.00 2,991,916.50
Pas. Dinding Keramik 20 x25 cm sekualitas MULIA (warna) 14.55 m2 185,840.00 2,703,972.00
3 Rabat Beton bag. samping bangunan dan depan selasar 1.59 m3 878,200.00 1,396,733.19
18,149,860.87
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pasang Instalasi Titik lampu 3.00 ttk 65,000.00 195,000.00
2 Pasang Instalasi Titik stop kontak + saklar standar (1 Phase) 2.00 ttk 55,000.00 110,000.00
3 Pasang Lampu SL 25 Watt setara Philips + Armatur 3.00 bh 30,000.00 90,000.00
4 Stop Kontak Broko Standard (1 Phase) 220 volt , 10 A 1.00 bh 17,500.00 17,500.00
5 Saklar Broko Ganda Standard (1 Phase) 1.00 unt 22,500.00 22,500.00
435,000.00
IX. PEK. ALAT PENGGANTUNG & KACA
1 Pasang kunci pintu double slag sekualitas "Kuda Terbang" 1.00 bh 160,500.00 160,500.00
2 Pasang engsel pintu H cabut sekualitas "Unilon " 6.00 bh 37,170.00 223,020.00
3 Pasang engsel jendela kupu-kupu 8.00 bh 19,580.00 156,640.00
4 Pasang hak angin jendela Type Kait 4.00 ps 29,670.00 118,680.00
5 Pasang espanyolet pada pintu doble 2.00 ps 39,050.00 78,100.00
6 Pasang kaca polos bening t= 3 mm 7.51 m2 61,220.00 459,762.20
7 Pasang selot jendela 4.00 bh 35,560.00 142,240.00
1,338,942.20
X. PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom Baru sekualitas Sanlex 232.30 m2 24,840.00 5,770,381.68
2 Pengecatan dinding dan kolom Lama sekualitas Sanlex 178.33 m2 21,050.00 3,753,783.35
3 Pengecatan plafond baru sekualitas Sanlex 101.03 m2 35,760.00 3,612,654.00
4 Pengecatan kayu baru kusen pintu, jendela , dan rangka daun jendela 14.52 m2 28,310.00 411,061.20
5 Pengecatan kayu Lama kusen pintu, jendela , dan rangka daun jendela 14.52 m2 20,430.00 296,643.60
6 Pengecatan lisplank baru 13.15 m2 28,310.00 372,333.12
7 Pengecatan lisplank Lama 13.15 m2 20,430.00 268,695.36
8 Pengecatan daun pintu baru 5.15 m2 28,310.00 145,751.20
9 Pengecatan daun pintu Lama 4.66 m2 20,430.00 95,269.18
10 Meni yang masuk tembok 5.59 m2 11,430.00 63,893.70
11 Residu rangka atap , kuda-kuda & gording 25.26 m2 11,560.00 291,962.25
15,082,428.64
XI. PEKERJAAN INSTALASI AIR HUJAN
1 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian 40.60 m1 92,950.00 3,773,770.00
3,773,770.00
C. PENGADAAN SARANA PENUNJANG
1 Pengadaan Meubeulair Ls 12,500,000.00 -
-
REKAPITULASI
REHABILITASI RUANG KELAS / PEMBANGUNAN RUANG KELAS BARU
( D . A . K ) TAHUN ANGGARAN 2012
SDN………………….
KECAMATAN………………………. KABUPATEN GARUT
JUMLAH
NO URAIAN PEKERJAAN HARGA
Rp.
1 2 3
A) JUMLAH 185,246,745.97
B) PPN 10% X A 18,524,674.60
C) JUMLAH A+B 203,771,420.57
D) DIBULATKAN 203,771,000.00
114,650,000.00
Terbilang :
Seratus Empat Belas Juta Enam Ratus Lima Puluh Ribu Rupiah
Garut,……………………... 2012
Konsultan Perencana
CV. ………………………..
………………………
Direktur
1
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. HARGA
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 0.63 m2 203,410.00 128,148.30
2 Pas. Bouwplank 1.00 ls 750,000.00 750,000.00
3 Pengadaan Air Kerja 1.00 ls 150,000.00 150,000.00
4 Mobilisasi Bahan 1.00 ls 500,000.00 500,000.00
1,528,148.30
B. PEKERJAAN PEMBANGUNAN RUANG KELAS ( 1 RKB )
I. PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi batu belah 30.50 m3 67,750.00 2,066,375.00
2 Galian tanah pondasi batu belah selasar 1.14 m3 67,750.00 77,235.00
3 Urugan tanah kembali 9.49 m3 22,570.00 214,234.44
4 Urugan pasir bawah pondasi bt. kali (t. 10 cm) 1.29 m3 385,250.00 495,392.98
5 Urugan pasir bawah lantai (t. 5 cm) 1.38 m3 255,100.00 352,707.64
6 Urugan tanah peninggian lantai (t. 20 cm) tanah urug disekitar lokasi 14.95 m3 50,500.00 755,126.50
3,961,071.55
II. PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) 3.45 m3 364,960.00 1,259,112.00
2 Pas. pondasi batu belah 1 : 5 8.62 m3 769,980.00 6,633,377.70
3 Pas. pondasi batu belah 1 : 3 2.76 m3 847,670.00 2,339,569.20
4 Pas. bata merah trasraam 1 : 3 6.11 m2 143,760.00 877,654.80
5 Pas. bata merah biasa 1 : 5 62.09 m2 137,470.00 8,536,130.92
6 Pas. bata merah biasa 1 : 5 1 bata (tempat duduk depan selasar ) 2.95 m2 287,360.00 848,286.72
7 Plesteran + Acian dinding & Plesteran Beton 1: 3 68.09 m2 59,810.00 4,072,223.66
8 Plester & Acian dinding 1: 5 136.00 m2 59,810.00 8,133,980.57
9 Pas. Neut kusen 2.00 bh 2,000.00 4,000.00
10 Tali Air Kusen 31.75 m1 1,000.00 31,750.00
32,736,085.57
III. PEKERJAAN BETON
1 Sloof beton 15/20 , K - 175 0.76 m3 5,957,500.00 4,551,589.58
2 Kolom struktur 15/20, K- 175 0.48 m3 6,901,400.00 3,294,452.30
3 Kolom struktur pada selasar 15/20, K- 175 0.17 m3 9,141,700.00 1,572,280.98
4 Kolom praktis 12/12 K - 175 0.07 m3 8,427,190.00 601,701.37
5 Ring balk 15/20 , K -175 0.43 m3 6,944,590.00 3,000,062.88
6 Balok selasar 15/20 , K -175 0.17 m3 8,080,940.00 1,370,204.19
7 Konsol beton 15/20, K -175 0.19 m3 8,080,940.00 1,544,752.49
8 Kuda - kuda beton 15/20 , K -175 0.23 m3 5,957,500.00 1,376,039.52
17,311,083.30
IV. PEKERJAAN KUSEN PINTU/JENDELA
1 Pek. kusen , pintu dan jendela 5/14 kayu Kls II 0.53 m3 6,620,750.00 3,518,928.63
2 Daun pintu Panil Kayu rangka kayu kls II 2.80 m2 627,250.00 1,755,296.40
3 Daun jendela kaca rangka kayu Hutan Kls II 2.33 m2 478,050.00 1,114,621.38
4 Angkur Kusen dia 8 mm 32.00 bh 1,500.00 48,000.00
6,436,846.41
1 2 3 4 5 6
V. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu 8/12 Kls II 0.95 m3 5,270,500.00 5,006,975.00
2 Pas. Balok Gordeng , Nok Kayu 8/12 Kls II 0.87 m3 4,417,900.00 3,843,573.00
3 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu 6/12 Kls II 0.71 m3 4,417,900.00 3,136,709.00
4 Pas. Reng 2/3 dan kaso Kayu 5/7 Kls II 109.07 m2 62,100.00 6,773,122.80
5 Pas. Genteng Palentong 109.07 m2 87,340.00 9,525,999.12
6 Pas. Bubungan genteng Palentong 9.00 m1 96,900.00 872,100.00
7 Pas. Papan Ruiter 9.00 m1 42,620.00 383,580.00
8 Pekerjaan pasang lisplank 2,5/28 kayu Kls II 30.22 m1 59,750.00 1,805,645.00
9 Pekerjaan pasang papan jalusi ampig kayu kls II 1.05 m2 555,100.00 582,855.00
10 Pas. Plasing seng 11.92 m1 84,580.00 1,008,193.60
11 Pas. Plat Besi Aisan Sudut, Tengah 50.5 12.00 bh 5,000.00 60,000.00
12 Pas. Plat Besi Penguat Kuda-kuda 50.5 6.00 bh 2,000.00 12,000.00
13 Pas. Mur Baud dia 12 mm 28.00 bh 2,000.00 56,000.00
14 Pas. Angker 8.00 bh 1,500.00 12,000.00
33,078,752.52
VI. PEKERJAAN PLAFOND
1 Rangka plafond kayu 5/10, 5/7 ky Kls II 96.26 m2 100,100.00 9,635,125.50
2 Pas. Plafond GRC t = 4mm 96.26 m2 44,220.00 4,256,396.10
3 Pas list plapond 73.04 m1 13,640.00 996,265.60
14,887,787.20
VII. PEKERJAAN LANTAI DAN DINDING
1 Pas. lantai keramik 30 x30 cm dlm ruangan sek. MULIA (Putih Polos ) 53.77 m2 205,630.00 11,057,239.18
2 Pas. lantai keramik 30 x30 cm untuk selasar sekualitas MULIA (Putih Polos) 14.55 m2 205,630.00 2,991,916.50
3 Rabat beton bag. samping bangunan dan depan selasar 1.10 m3 878,200.00 966,766.47
15,015,922.15
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pasang Instalasi Titik lampu 3.00 ttk 65,000.00 195,000.00
2 Pasang Instalasi Titik stop kontak + saklar standar (1 Phase) 2.00 ttk 55,000.00 110,000.00
3 Pasang Lampu SL 25 Watt setara Philips + Armatur 3.00 bh 30,000.00 90,000.00
4 Stop Kontak Broko Standard (1 Phase) 220 volt , 10 A 1.00 bh 17,500.00 17,500.00
5 Saklar Broko Ganda Standard (1 Phase) 1.00 unt 22,500.00 22,500.00
435,000.00
IX. PEK. ALAT PENGGANTUNG & KACA
1 Pasang kunci pintu double slag sekualitas "Kuda Terbang" 1.00 bh 160,500.00 160,500.00
2 Pasang engsel pintu H cabut sekualitas "Unilon " 6.00 bh 37,170.00 223,020.00
3 Pasang engsel jendela kupu-kupu 8.00 bh 19,580.00 156,640.00
4 Pasang hak angin jendela Type Kait 4.00 ps 29,670.00 118,680.00
5 Pasang espanyolet pada pintu doble 2.00 bh 39,050.00 78,100.00
6 Pasang kaca polos bening t= 3 mm 7.51 m2 61,220.00 459,762.20
7 Pasang selot jendela 4.00 bh 35,560.00 142,240.00
1,338,942.20
X. PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom Baru sekualitas Sanlex 227.37 m2 24,840.00 5,647,945.32
2 Pengecatan plafond baru sekualitas Sanlex 96.26 m2 35,760.00 3,442,078.80
3 Pengecatan kayu baru kusen pintu, jendela , dan rangka daun jendela 14.52 m2 28,310.00 411,061.20
4 Pengecatan lisplank baru 9.18 m2 28,310.00 259,885.80
5 Pengecatan daun pintu baru 5.60 m2 28,310.00 158,445.41
6 Meni yang masuk tembok 5.59 m2 11,430.00 63,893.70
7 Residu rangka atap , kuda-kuda & gording 27.27 m2 11,560.00 315,206.52
10,298,516.75
XI. PEKERJAAN INSTALASI AIR HUJAN
1 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian 44.48 m1 92,950.00 4,134,416.00
4,134,416.00
REKAPITULASI
REHABILITASI RUANG KELAS / PEMBANGUNAN RUANG KELAS BARU
( D . A . K ) TAHUN ANGGARAN 2012
SDN. BALEWANGI I
KECAMATAN CISURUPAN KABUPATEN GARUT
JUMLAH
NO URAIAN PEKERJAAN HARGA
Rp.
1 2 3
A) JUMLAH 141,162,571.94
B) PPN 10% X A 14,116,257.19
C) JUMLAH A+B 155,278,829.13
D) DIBULATKAN 155,279,000.00
Terbilang :
Seratus Empat Belas Juta Enam Ratus Lima Puluh Ribu Rupiah
139,634,423.64
Garut, Mei 2012
Konsultan Perencana
CV. BINANGKIT MULYA WICAKSANA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. HARGA
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 0.63 m2 203,410.00 128,148.30
2 Pas. Bouwplank 1.00 ls 750,000.00 750,000.00
3 Pengadaan Air Kerja 1.00 ls 150,000.00 150,000.00
4 Mobilisasi Bahan 1.00 ls 500,000.00 500,000.00
1,528,148.30
B. PEKERJAAN PEMBANGUNAN RUANG KELAS ( 1 RKB )
I PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi batu belah 37.50 m3 67,750.00 2,540,625.00
2 Galian tanah pondasi batu belah selasar 1.36 m3 67,750.00 91,869.00
3 Urugan tanah kembali 7.77 m3 22,570.00 175,395.98
4 Urugan pasir bawah pondasi bt. kali (t. 5 cm) 1.66 m3 385,250.00 638,089.58
5 Urugan pasir bawah lantai (t. 5 cm) 1.38 m3 255,100.00 352,707.64
6 Urugan tanah peninggian lantai (t. 20 cm) tanah urug disekitar lokasi 13.32 m3 50,500.00 672,710.50
4,471,397.70
II PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) 4.50 m3 364,960.00 1,642,320.00
2 Pas. pondasi batu belah 1 : 5 11.11 m3 769,980.00 8,551,397.88
3 Pas. pondasi batu belah 1 : 3 3.60 m3 847,670.00 3,051,612.00
4 Pas. bata merah trasraam 1 : 3 8.16 m2 143,760.00 1,173,081.60
5 Pas. bata merah biasa 1 : 5 85.14 m2 137,470.00 11,704,127.07
6 Plesteran + Acian dinding & Plesteran Beton 1: 3 70.62 m2 63,220.00 4,464,280.30
7 Plester & Acian dinding 1: 5 170.28 m2 59,810.00 10,184,386.99
8 Pas. Neut kusen 2.00 bh 2,000.00 4,000.00
9 Tali Air Kusen 31.75 m1 1,000.00 31,750.00
40,806,955.84
III PEKERJAAN BETON
1 Sloof beton 15/20 , K - 175 0.90 m3 5,957,500.00 5,333,868.90
2 Kolom Kolom struktur 15/20, K- 175 0.55 m3 6,901,400.00 3,829,448.83
3 Kolom struktur pada selasar 15/20, K- 175 0.20 m3 9,141,700.00 1,827,608.66
4 Kolom praktis 12/12 K - 175 0.11 m3 8,427,190.00 888,225.83
5 Ring balk 15/20 , K -175 0.36 m3 6,944,590.00 2,500,052.40
6 Balok selasar 15/20 , K -175 0.17 m3 8,080,940.00 1,370,204.19
7 Konsol beton 15/20, K -175 0.24 m3 8,080,940.00 1,920,031.34
8 Kuda - kuda beton 15/20 , K -175 0.19 m3 5,957,500.00 1,146,699.60
18,816,139.75
IV PEKERJAAN KUSEN PINTU/JENDELA
1 Pek. kusen , pintu dan jendela 5/14 kayu Kls II 0.53 m3 6,620,750.00 3,518,928.63
2 Daun pintu Panil Kayu rangka kayu kls II 2.56 m2 627,250.00 1,607,014.50
3 Daun jendela kaca rangka kayu Hutan Kls II 2.33 m2 478,050.00 1,114,621.38
4 Angkur Kusen dia 8 mm 32.00 bh 1,500.00 48,000.00
6,288,564.51
1 2 3 4 5 6
V PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Rangka Atap Baja Ringan 119.20 m2 139,100.00 16,580,720.00
2 Pas. Genteng Palentong 119.20 m2 87,340.00 10,410,928.00
3 Pas. Bubungan genteng Palentong 10.00 m1 96,900.00 969,000.00
4 Pekerjaan pasang lisplank 2,5/28 kayu Kls II 43.84 m1 59,750.00 2,619,440.00
5 Pekerjaan pasang papan jalusi ampig kayu kls II 2.10 m2 555,100.00 1,165,710.00
6 Pas. Plasing seng 23.84 m1 84,580.00 2,016,387.20
33,762,185.20
VI PEKERJAAN PLAFOND
1 Rangka plafond kayu 5/10, 5/7 ky Kls II 108.18 m2 100,100.00 10,828,317.50
2 Pas. Plafond enternit t = 4mm 108.18 m2 22,950.00 2,482,616.25
3 Pas. list plapond 75.44 m1 13,640.00 1,029,001.60
14,339,935.35
VIIPEKERJAAN LANTAI DAN DINDING
1 Pas. lantai keramik 30 x30 cm dlm ruangan sek. MULIA (Putih Polos ) 53.77 m2 205,630.00 11,057,239.18
2 Pas. lantai keramik 30 x30 cm untuk selasar sekualitas MULIA (Putih Po 14.55 m2 205,630.00 2,991,916.50
3 Rabat beton bag. samping bangunan dan depan selasar 1.59 m3 878,200.00 1,396,733.19
15,445,888.87
VIIIPEKERJAAN INSTALASI LISTRIK
1 Pasang Instalasi Titik lampu 3.00 ttk 55,000.00 165,000.00
2 Pasang Instalasi Titik stop kontak + saklar standar (1 Phase) 2.00 ttk 45,000.00 90,000.00
3 Pasang Lampu SL 25 Watt setara Philips + Armatur 3.00 bh 30,000.00 90,000.00
4 Stop Kontak Broko Standard (1 Phase) 220 volt , 10 A 1.00 bh 17,500.00 17,500.00
5 Saklar Broko Ganda Standard (1 Phase) 1.00 unt 22,500.00 22,500.00
385,000.00
IX PEKERJAAN ALAT PENGGANTUNG & KACA
1 Pasang kunci pintu double slag sekualitas "Kuda Terbang" 1.00 bh 160,500.00 160,500.00
2 Pasang engsel pintu H cabut sekualitas "Unilon " 6.00 bh 37,170.00 223,020.00
3 Pasang engsel jendela kupu-kupu 8.00 bh 19,580.00 156,640.00
4 Pasang hak angin jendela Type Kait 4.00 ps 29,670.00 118,680.00
5 Pasang espanyolet pada pintu doble 2.00 ps 39,050.00 78,100.00
6 Pasang kaca polos bening t= 3 mm 7.51 m2 61,220.00 459,762.20
7 Pasang selot jendela 4.00 bh 35,560.00 142,240.00
1,338,942.20
X PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom Baru sekualitas Sanlex 240.89 m2 24,840.00 5,983,806.96
2 Pengecatan plafond baru sekualitas Sanlex 108.18 m2 35,760.00 3,868,338.00
3 Pengecatan kayu baru kusen pintu, jendela , dan rangka daun jendela 14.52 m2 28,310.00 411,061.20
4 Pengecatan lisplank baru 12.28 m2 28,310.00 347,510.91
5 Pengecatan daun pintu baru 5.12 m2 28,310.00 145,060.44
6 Meni yang masuk tembok 5.59 m2 11,430.00 63,893.70
10,819,671.21
XI PEKERJAAN INSTALASI AIR HUJAN
1 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian 40.60 m1 92,950.00
-
REKAPITULASI
REHABILITASI RUANG KELAS / PEMBANGUNAN RUANG KELAS BARU
( D . A . K ) TAHUN ANGGARAN 2012
SDN. BALEWANGI I
KECAMATAN CISURUPAN KABUPATEN GARUT
JUMLAH
NO URAIAN PEKERJAAN HARGA
Rp.
1 2 3
A) JUMLAH 148,002,828.92
B) PPN 10% X A 14,800,282.89
10.2 C) JUMLAH A+B 162,803,111.81
D) DIBULATKAN 162,803,000.00
Terbilang :
#REF!
Konsultan Perencana
CV. BINANGKIT MULYA WICAKSANA
Garut,……………………... 2012
Konsultan Perencana
CV. ………………………..
………………………
Direktur
RENCANA ANGGARAN BIAYA
REHABILITASI RUANG KELAS / PEMBANGUNAN RUANG KELAS BARU
( D . A . K ) TAHUN ANGGARAN 2012
SDN………………….
KECAMATAN………………………. KABUPATEN GARUT
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. HARGA
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 0.63 m2 203,410.00 128,148.30
2 Pas. Bouwplank 39.60 m1 43,970.00 1,741,212.00
3 Pek. Bongkaran 1.00 ls 2,000,000.00 2,000,000.00
4 Pengadaan Air Kerja 1.00 ls 150,000.00 150,000.00
5 Mobilisasi Bahan 1.00 ls 500,000.00 500,000.00
4,519,360.30
B. PEKERJAAN REHABILITASI / PEMBANGUNAN RUANG KELAS ( …..RKB )
I. PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi batu belah 37.50 m3 67,750.00 2,540,625.00
2 Galian tanah pondasi batu belah selasar m3 67,750.00 -
3 Urugan tanah kembali m3 22,570.00 -
4 Urugan pasir bawah pondasi bt. kali (t. 10 cm) m3 255,100.00 -
5 Urugan pasir bawah lantai (t. 5 cm) m3 255,100.00 -
6 Urugan tanah peninggian lantai (t. 20 cm) tanah urug disekitar lokasi m3 50,500.00 -
7 Pemadatan Tanah Sekitar Lokasi m3 50,500.00 -
2,540,625.00
II. PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) m3 364,960.00 -
2 Pas. pondasi batu belah 1 : 5 m3 769,980.00 -
3 Pas. pondasi batu belah 1 : 3 m3 847,670.00 -
4 Pas. bata merah trasraam 1 : 3 m2 143,760.00 -
5 Pas. bata merah biasa 1 : 5 m2 137,470.00 -
6 Pas. bata merah biasa 1 : 5 1 bata (tempat duduk depan selasar ) m2 287,360.00 -
7 Plesteran + Acian dinding & Plesteran Beton 1: 3 m2 63,220.00 -
8 Plester & Acian dinding 1: 5 m2 59,810.00 -
9 Pas. Neut kusen bh 2,000.00 -
10 Tali Air Kusen m1 1,000.00 -
-
III. PEKERJAAN BETON
1 Cor Beton Composite 15/20 K-175 m3 3,714,440.00 -
2 Sloof beton 15/20 , K - 175 m3 5,957,500.00 -
3 Kolom struktur 15/20, K- 175 m3 6,901,400.00 -
4 Kolom struktur pada selasar 15/20, K- 175 m3 9,141,700.00 -
5 Kolom praktis 12/12 K - 175 m3 8,427,190.00 -
6 Ring balk 15/20 , K -175 m3 6,944,590.00 -
7 Balok selasar 15/20 , K -175 m3 8,080,940.00 -
8 Konsol beton 15/20, K -175 m3 8,080,940.00 -
9 Kuda - kuda beton 15/20 , K -175 m3 5,957,500.00 -
-
IV. PEKERJAAN KUSEN PINTU/JENDELA
1 Pek. Kusen , Pintu dan Jendela 5/14 kayu Kls II m3 6,620,750.00 -
2 Pek. Kusen , Pintu dan Jendela 5/14 kayu Lama m3 3,559,500.00 -
3 Pek. Kusen Partisi 5/14 kayu Kls II m3 6,620,750.00
4 Daun pintu Panil Kayu rangka kayu kls II m2 627,250.00 -
5 Daun jendela kaca rangka kayu Hutan Kls II m2 478,050.00 -
6 Pas. Daun Partisi Rangka kayu Hutan Kls II 233,750.00
7 Daun Pintu Double Triplek Rangka kayu Hutan Kls II 312,030.00
8 Pek. Kusen Ampig 6,620,750.00
9 Angkur Kusen dia 8 mm bh 1,500.00 -
-
1 2 3 4 5 6
V. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu 8/12 Kls II m3 5,270,500.00 -
2 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu Lama m3 2,245,500.00 -
3 Pas. Balok Gordeng , Nok Kayu 8/12 Kls II m3 4,417,900.00 -
4 Pas. Balok Gordeng , Nok Kayu Lama m3 1,392,900.00 -
5 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu 6/12 Kls II m3 4,417,900.00 -
6 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu Lama m3 1,392,900.00 -
7 Pas. Reng 2/3 dan kaso Kayu 5/7 Kls II m2 62,100.00 -
8 Pas. Kaso Kayu Lama m2 19,750.00 -
9 Pas. Reng 2/3 Kayu 5/7 Kls II m2 26,950.00 -
10 Pas. Genteng Palentong m2 87,340.00 -
11 Pas. Genteng Palentong Lama m2 22,340.00 -
12 Pas. Bubungan genteng Palentong m1 96,900.00 -
13 Pas. Papan Ruiter m1 42,620.00 -
14 Pekerjaan pasang lisplank 2,5/28 kayu Kls II m1 59,750.00 -
15 Pekerjaan pasang lisplank kayu Lama m1 38,770.00 -
15 Pekerjaan pasang papan jalusi ampig kayu kls II m2 555,100.00 -
16 Pas. Plasing seng m1 84,580.00 -
17 Pas. Plat Besi Aisan Sudut, Tengah 50.5 bh 5,000.00 -
18 Pas. Plat Besi Penguat Kuda-kuda 50.5 bh 2,000.00 -
19 Pas. Mur Baud dia 12 mm bh 2,000.00 -
20 Pas. Angker bh 1,500.00 -
-
PEKERJAAN KUDA-KUDA DAN ATAP
Pas. Rangka Atap Baja Ringan m2 139,100.00 -
Pas. Genteng Palentong m2 87,340.00 -
Pas. Bubungan genteng Palentong m1 96,900.00 -
Pekerjaan pasang lisplank 2,5/28 kayu Kls II m1 59,750.00 -
Pekerjaan pasang papan jalusi ampig kayu kls II m2 555,100.00 -
Pas. Plasing seng m1 84,580.00 -
-
VI. PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 5/10, 5/7 ky Kls II m2 100,100.00 -
Rangka Plafond Kayu Lama m2 58,570.00 -
Pas. Plafond Eternit t = 4mm m2 22,950.00 -
2 Pas. Plafond GRC t = 4mm m2 44,220.00 -
3 Pas. List Plapond m1 13,640.00 -
-
VII. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik 30 x30 cm dlm ruangan sek. MULIA (Putih Polos ) m2 205,630.00 -
2 Pas. Lantai Keramik 30 x30 cm untuk selasar sekualitas MULIA (Putih Polos) m2 205,630.00 -
Pas. Dinding Keramik 20 x25 cm sekualitas MULIA (warna) m2 185,840.00 -
3 Rabat Beton bag. samping bangunan dan depan selasar m3 878,200.00 -
-
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pasang Instalasi Titik lampu ttk 65,000.00 -
2 Pasang Instalasi Titik stop kontak + saklar standar (1 Phase) ttk 55,000.00 -
3 Pasang Lampu SL 25 Watt setara Philips + Armatur bh 30,000.00 -
4 Stop Kontak Broko Standard (1 Phase) 220 volt , 10 A bh 17,500.00 -
5 Saklar Broko Ganda Standard (1 Phase) unt 22,500.00 -
-
IX. PEK. ALAT PENGGANTUNG & KACA
1 Pasang kunci pintu double slag sekualitas "Kuda Terbang" bh 160,500.00 -
2 Pasang engsel pintu H cabut sekualitas "Unilon " bh 37,170.00 -
3 Pasang engsel jendela kupu-kupu bh 19,580.00 -
4 Pasang hak angin jendela Type Kait ps 29,670.00 -
5 Pasang espanyolet pada pintu doble ps 39,050.00 -
6 Pasang kaca polos bening t= 3 mm m2 61,220.00 -
7 Pasang selot jendela bh 35,560.00 -
-
X. PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom Baru sekualitas Sanlex m2 24,840.00 -
2 Pengecatan dinding dan kolom Lama sekualitas Sanlex m2 21,050.00 -
3 Pengecatan plafond baru sekualitas Sanlex m2 35,760.00 -
4 Pengecatan kayu baru kusen pintu, jendela , dan rangka daun jendela m2 28,310.00 -
5 Pengecatan kayu Lama kusen pintu, jendela , dan rangka daun jendela m2 20,430.00 -
6 Pengecatan lisplank baru m2 28,310.00 -
7 Pengecatan lisplank Lama m2 20,430.00 -
8 Pengecatan daun pintu baru m2 28,310.00 -
9 Pengecatan daun pintu Lama m2 20,430.00 -
10 Meni yang masuk tembok m2 11,430.00 -
11 Residu rangka atap , kuda-kuda & gording m2 11,560.00 -
-
XI. PEKERJAAN INSTALASI AIR HUJAN
1 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian m1 92,950.00 -
-
C. PENGADAAN SARANA PENUNJANG
1 Pengadaan Meubeulair Ls 12,500,000.00 -
-
REKAPITULASI
REHABILITASI RUANG KELAS / PEMBANGUNAN RUANG KELAS BARU
( D . A . K ) TAHUN ANGGARAN 2012
SDN………………….
KECAMATAN………………………. KABUPATEN GARUT
JUMLAH
NO URAIAN PEKERJAAN HARGA
Rp.
1 2 3
A) JUMLAH 7,059,985.30
B) PPN 10% X A 705,998.53
C) JUMLAH A+B 7,765,983.83
D) DIBULATKAN 7,766,000.00
Terbilang :
#NAME?
Garut,……………………... 2012
Konsultan Perencana
CV. ………………………..
………………………
Direktur
MENU
120 Volume(m3) 8 215 Volume(m3) 12.05 80 65 65 Volume(m3) 14
0.007 0.056 0.007 0.08435 0.007 0.098
80
Volume(m3) 6.8 215 Volume(m3) 5.9
0.007 0.0476 0.007 0.0413
40
Luas(m2) 2.08 40 Luas(m2) 0.86
2 2
P1 P2 J1 BV 1 PJ 1 Jumlah
8 Banyaknya 3 2 8 2 0 1.855
2 0.2632 Volume 0.168 0.0952 0.6748 0.0826 0 1.0206
Luas 9.36 4.16 24.08 1.72 0 39.32
Meny 2.688 1.68 7.952 1.428 0 13.748 Tali Air 9.92
Cat Kayu 6.432 3.488 28.68 3.056 0 41.656 297.54286
Angkur 24 12 80 12 0 128
1.855 Kaca 1.281 0.574 19.1664 1.407 0 22.4284
Engsel Pintu 18 6 0 24
Engsel Jndl 32 0 32
Daun Pintu 7.56 3.36 10.92
Daun Jendela 1.281 0.574 3.4304 2.7035 7.9889
2 Kayu 8/12 Kayu 6/12
7.5 7.5 7.5 0.0096 0.0072
45 20.24 Kuda2 0.58
28 8.5 0.096 Gordeng/Nok 0.82 5.5
73 0.4 29.2 3.4 0.051 Gapit 0.20 7.12
Ikat Angin 0.14
7 2 Silang Gempa 0.17
1.76 1.3
0.92 1 1
1.7
1.8
7
Lokal Kuda+Skoor Gordeng+Nok Gapit+Ikat An Rangka Atap Plapond
2 Luas Bata Keseluruhan 4 2.33 3.26 2.05 107.27 241.45
Depan 15
Belakang 15
Samping 7
37
125.8
86.48 172.96 12.62
20
0.0204
0.408
7.5
3.4
7.5
1.8
JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT. HARGA SAT. HARGA
Rp. Rp.
1 2 3 4 5 6
A. PEKERJAAN PERSIAPAN
1 Papan Nama Proyek 0.63 m2 203,410.00 128,148.30
2 Pas. Bouwplank m1 43,970.00 -
3 Pek. Bongkaran 1.00 ls 1,175,000.00 1,175,000.00
4 Pengadaan Air Kerja 1.00 ls 300,000.00 300,000.00
5 Mobilisasi Bahan 1.00 ls 700,000.00 700,000.00
2,303,148.30
B. PEKERJAAN REHABILITASI 2 RUANG KELAS
I. PEKERJAAN TANAH DAN PASIR
1 Galian tanah pondasi batu belah m3 67,750.00 -
2 Galian tanah pondasi batu belah selasar m3 67,750.00 -
3 Urugan tanah kembali m3 22,570.00 -
4 Urugan pasir bawah pondasi bt. kali (t. 10 cm) m3 255,100.00 -
5 Urugan pasir bawah lantai (t. 5 cm) m3 255,100.00 -
6 Urugan tanah peninggian lantai (t. 20 cm) tanah urug disekitar lokasi m3 50,500.00 -
7 Pemadatan Tanah Sekitar Lokasi m3 50,500.00 -
-
I. PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) m3 364,960.00 -
2 Pas. pondasi batu belah 1 : 5 m3 769,980.00 -
3 Pas. pondasi batu belah 1 : 3 m3 847,670.00 -
4 Pas. bata merah trasraam 1 : 3 m2 143,760.00 -
5 Pas. bata merah biasa 1 : 5 m2 137,470.00 -
6 Pas. bata merah biasa 1 : 5 1 bata (tempat duduk depan selasar ) m2 287,360.00 -
7 Plesteran + Acian dinding & Plesteran Beton 1: 3 12.99 m2 63,220.00 820,911.70
8 Plester & Acian dinding 1: 5 17.26 m2 59,810.00 1,032,320.60
9 Pas. Neut kusen 6.00 bh 2,000.00 12,000.00
10 Tali Air Kusen 18.80 m1 1,000.00 18,800.00
1,884,032.30
II. PEKERJAAN BETON
1 Cor Beton Composite 15/20 K-175 m3 3,714,440.00 -
2 Sloof beton 15/20 , K - 175 m3 5,957,500.00 -
3 Kolom struktur 15/20, K- 175 0.56 m3 6,901,400.00 3,843,527.69
4 Kolom struktur pada selasar 15/20, K- 175 0.49 m3 9,141,700.00 4,492,231.38
5 Kolom praktis 12/12 K - 175 m3 8,427,190.00 -
6 Ring balk 15/20 , K -175 1.19 m3 6,944,590.00 8,287,673.71
7 Balok selasar 15/20 , K -175 0.39 m3 8,080,940.00 3,138,960.33
8 Konsol beton 15/20, K -175 0.46 m3 8,080,940.00 3,706,242.32
9 Kuda - kuda beton 15/20 , K -175 0.16 m3 5,957,500.00 947,957.40
24,416,592.83
III. PEKERJAAN KUSEN PINTU/JENDELA
1 Pek. Kusen , Pintu dan Jendela 5/14 kayu Kls II 0.31 m3 6,620,750.00 2,033,894.40
2 Pek. Kusen , Pintu dan Jendela 5/14 kayu Lama m3 3,559,500.00 -
3 Pek. Kusen Partisi 5/14 kayu Kls II m3 6,620,750.00 -
4 Daun pintu Panil Kayu rangka kayu kls II 6.72 m2 627,250.00 4,215,120.00
5 Daun jendela kaca rangka kayu Hutan Kls II m2 478,050.00 -
6 Pas. Daun Partisi Rangka kayu Hutan Kls II 233,750.00 -
7 Daun Pintu Double Triplek Rangka kayu Hutan Kls II 312,030.00 -
8 Pek. Kusen Ampig 0.02 6,620,750.00 106,594.08
9 Angkur Kusen dia 8 mm 16.00 bh 1,500.00 24,000.00
6,379,608.48
1 2 3 4 5 6
IV. PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu 8/12 Kls II 0.09 m3 5,270,500.00 484,886.00
2 Pas. Balok Kuda-kuda, Skoor dan balok jure Kayu Lama m3 2,245,500.00 -
3 Pas. Balok Gordeng , Nok Kayu 8/12 Kls II 0.25 m3 4,417,900.00 1,104,475.00
4 Pas. Balok Gordeng , Nok Kayu Lama m3 1,392,900.00 -
5 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu 6/12 Kls II m3 4,417,900.00 -
6 Pas. Balok Ikat Angin, gapit dan Ikat Gempa Kayu Lama m3 1,392,900.00 -
7 Pas. Reng 2/3 dan kaso Kayu 5/7 Kls II 41.90 m2 62,100.00 2,601,890.64
8 Pas. Kaso Kayu Lama m2 19,750.00 -
9 Pas. Reng 2/3 Kayu 5/7 Kls II m2 26,950.00 -
10 Pas. Genteng Palentong 20.95 m2 87,340.00 1,829,703.13
11 Pas. Genteng Palentong Lama m2 22,340.00 -
12 Pas. Bubungan genteng Palentong m1 96,900.00 -
13 Pas. Papan Ruiter m1 42,620.00 -
14 Pekerjaan pasang lisplank 2,5/28 kayu Kls II 58.44 m1 59,750.00 3,491,790.00
15 Pekerjaan pasang lisplank kayu Lama m1 38,770.00 -
15 Pekerjaan pasang papan jalusi ampig kayu kls II 0.66 m2 555,100.00 366,366.00
16 Pas. Plasing seng 25.24 m1 84,580.00 2,134,799.20
17 Pas. Plat Besi Aisan Sudut, Tengah 50.5 bh 5,000.00 -
18 Pas. Plat Besi Penguat Kuda-kuda 50.5 bh 2,000.00 -
19 Pas. Mur Baud dia 12 mm bh 2,000.00 -
20 Pas. Angker bh 1,500.00 -
12,013,909.97
IV.PEKERJAAN KUDA-KUDA DAN ATAP
1 Pas. Rangka Atap Baja Ringan 201.92 m2 139,100.00 28,087,072.00
2 Pas. Genteng Palentong 201.92 m2 87,340.00 17,635,692.80
3 Pas. Bubungan genteng Palentong 16.20 m1 96,900.00 1,569,780.00
4 Pekerjaan pasang lisplank 2,5/28 kayu Kls II 57.24 m1 59,750.00 3,420,090.00
5 Pekerjaan pasang papan jalusi ampig kayu kls II 1.86 m2 555,100.00 1,029,710.50
6 Pas. Plasing seng 25.24 m1 84,580.00 2,134,799.20
53,877,144.50
V. PEKERJAAN PLAFOND
1 Rangka Plafond Kayu 5/10, 5/7 ky Kls II 71.58 m2 100,100.00 7,165,398.24
2 Rangka Plafond Kayu Lama m2 58,570.00 -
3 Pas. Plafond Eternit t = 4mm m2 22,950.00 -
4 Pas. Plafond GRC t = 4mm 178.96 m2 44,220.00 7,913,434.32
5 Pas. List Plapond 148.08 m1 13,640.00 2,019,811.20
17,098,643.76
VI. PEKERJAAN LANTAI DAN DINDING
1 Pas. Lantai Keramik 30 x30 cm dlm ruangan sek. MULIA (Putih Polos ) 105.79 m2 205,630.00 21,753,597.70
2 Pas. Lantai Keramik 30 x30 cm untuk selasar sekualitas MULIA (Putih Pol 30.00 m2 205,630.00 6,168,900.00
3 Pas. Dinding Keramik 20 x25 cm sekualitas MULIA (warna) m2 185,840.00 -
4 Rabat Beton bag. samping bangunan dan depan selasar m3 878,200.00 -
27,922,497.70
VII. PEKERJAAN INSTALASI LISTRIK
1 Pasang Instalasi Titik lampu 10.00 ttk 60,000.00 600,000.00
2 Pasang Instalasi Titik stop kontak + saklar standar (1 Phase) 7.00 ttk 55,000.00 385,000.00
3 Pasang Lampu SL 25 Watt setara Philips + Armatur 10.00 bh 28,000.00 280,000.00
4 Stop Kontak Broko Standard (1 Phase) 220 volt , 10 A 2.00 bh 17,500.00 35,000.00
5 Saklar Broko Ganda Standard (1 Phase) 5.00 unt 21,500.00 107,500.00
1,407,500.00
VIII. PEK. ALAT PENGGANTUNG & KACA
1 Pasang kunci pintu double slag sekualitas "Kuda Terbang" 3.00 bh 160,500.00 481,500.00
2 Pasang engsel pintu H cabut sekualitas "Unilon " 15.00 bh 37,170.00 557,550.00
3 Pasang engsel jendela kupu-kupu bh 19,580.00 -
4 Pasang hak angin jendela Type Kait ps 29,670.00 -
5 Pasang espanyolet pada pintu doble 2.00 ps 39,050.00 78,100.00
6 Pasang kaca polos bening t= 3 mm 1.14 m2 61,220.00 69,852.02
7 Pasang selot jendela bh 35,560.00 -
1,187,002.02
IX. PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom Baru sekualitas Sanlex 30.25 m2 24,840.00 751,285.80
2 Pengecatan dinding dan kolom Lama sekualitas Sanlex 171.82 m2 21,050.00 3,616,811.00
3 Pengecatan plafond baru sekualitas Sanlex 178.96 m2 35,760.00 6,399,466.56
4 Pengecatan kayu baru kusen pintu, jendela , dan rangka daun jendela 13.44 m2 28,310.00 380,486.40
5 Pengecatan kayu Lama kusen pintu, jendela , dan rangka daun jendela 38.77 m2 20,430.00 792,030.24
6 Pengecatan lisplank baru 17.53 m2 28,310.00 496,330.92
7 Pengecatan lisplank Lama m2 20,430.00 -
8 Pengecatan daun pintu baru 13.44 m2 28,310.00 380,486.40
9 Pengecatan daun pintu Lama m2 20,430.00 -
10 Meni yang masuk tembok 2.63 m2 11,430.00 30,083.76
11 Residu rangka atap , kuda-kuda & gording 10.47 m2 11,560.00 121,086.38
12,968,067.46
X. PEKERJAAN INSTALASI AIR HUJAN
1 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian 30.00 m1 92,950.00 2,788,500.00
2,788,500.00
C. PENGADAAN SARANA PENUNJANG
1 Pengadaan Meubeulair Ls 12,500,000.00 -
-
REKAPITULASI
REHABILITASI 2 (DUA)RUANG KELAS
(BLOCK GRANT)
TAHUN ANGGARAN 2013
SD NEGERI…………………………..
JUMLAH
NO URAIAN PEKERJAAN HARGA
Rp.
1 2 3
A) JUMLAH 110,369,502.81
Terbilang :
#NAME?
Garut,……………………... 2012
Konsultan Perencana
CV. ………………………..
………………………
Direktur
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Pembangunan No. 179 Garut 44151
Kegiatan :
LAPORAN KEMAJUAN
Pekerjaan : PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
BULANAN
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 11 Oktober 2012
Serah Terima Pekerjaan : 28 Oktober 2012 Sisa Waktu : 17 Hari Kalender
MINGGU KE
NO KETERANGAN
I II III IV
KETERANGAN :
###
Waktu pelaksanaan sampai dengan saat ini : 28 Hari Kalender
###
Sisa waktu yang masih tersisa : 17 Hari Kalender
###
Sisa pekerjaan yang harus diselesaikan : 100.00 %
###
Sisa pekerjaan yang harus di capai Per - minggu : 33.33 %
……………………………
Pengawas Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN
JL. PEMBANGUNAN NO. 179 TLP 0262-233155
II PEKERJAAN PASANGAN
1 Pasangan batu kosong (anstamping) m3 364,960.00
2 Pas. pondasi batu belah 1 : 5 m3 769,980.00
1 Pas. pondasi Plat Setempat 50 x 50 20 1.23 m3 878,200.00
2 Pas. bata merah trasraam 1 : 3 10.32 m2 143,760.00
3 Pas. bata merah biasa 1 : 5 99.02 m2 137,470.00
4 Plesteran + Acian dinding & Plesteran Beton 1: 3 20.64 m2 63,220.00
5 Plester & Acian dinding 1: 5 198.04 m2 59,810.00
6 Pas. Neut kusen 4.00 bh 2,000.00
7 Tali Air Kusen 63.50 m1 1,000.00
VI PEKERJAAN PLAFOND
1 Rangka plafond kayu 5/10, 5/7 ky Kls II 138.75 m2 100,100.00
2 Pas. Plafond GRC t = 4mm 138.75 m2 44,220.00
3 Pas list plapond m1 13,640.00
IX PEKERJAAN PENGECATAN
1 Pengecatan dinding dan kolom sekualitas Sanlex m2 24,840.00
2 Pengecatan plafond sekualitas Sanlex m2 35,760.00
3 Meni kayu kusen pintu, jendela , dan rangka daun jendela m2 28,310.00
4 Pengecatan lisplank m2 28,310.00
5 Pengecatan daun pintu m2 28,310.00
1 Meni kayu kusen pintu, jendela , dan rangka daun jendela 32.12 m2 11,430.00
X PEKERJAAN LAIN-LAIN
1 Pengadaan mebeulair ruang kelas Lokal 5,000,000.00
2 Pas. Saluran air hujan Gravel dan pas. Bata 1 : 3 + plesteran dan acian m1 92,950.00
1 Pek. Pembersihan lahan sisa pekerjaan 1.00 ls 500,000.00
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN
JL. PEMBANGUNAN NO. 179 TLP 0262-233155
NO URAIAN PEKERJAAN
1 2
A. PEKERJAAN PERSIAPAN
A) JUMLAH
D) DIBULATKAN
Terbilang :
Seratus Empat Belas Juta Enam Ratus Lima Puluh Ribu Rupiah
Mengetahui / Menyetujui :
Kepala Dinas Pendidikan
Kabupaten Garut
KONSULTAN
PERENCANA
Jumlah
Harga
(Rp.)
6
88,023.60
-
-
-
-
88,023.60
143,630.00
-
20,087.30
1,770,394.00
1,408,950.00
1,934,111.30
-
-
1,080,186.00
1,483,603.20
13,612,279.40
1,304,860.80
11,844,772.40
8,000.00
63,500.00
29,397,201.80
11,402,655.00
5,490,753.84
3,668,655.63
859,573.38
12,500,262.00
4,848,564.00
5,006,142.33
1,376,039.52
45,152,645.70
7,037,857.25
3,510,592.80
2,229,242.76
96,000.00
12,873,692.81
Jumlah
Harga
(Rp.)
6
27,358,188.00
17,178,031.20
1,550,400.00
2,449,750.00
582,855.00
-
49,119,224.20
13,888,875.00
6,135,525.00
-
20,024,400.00
23,133,375.00
-
-
23,133,375.00
-
-
-
-
-
-
321,000.00
223,020.00
156,640.00
237,360.00
156,200.00
599,956.00
284,480.00
1,978,656.00
-
-
-
-
-
367,131.60
367,131.60
-
-
500,000.00
500,000.00
RUT
KONSULTAN
PERENCANA
YA
JUMLAH
HARGA
Rp.
3
88,023.60
1,934,111.30
29,397,201.80
45,152,645.70
12,873,692.81
49,119,224.20
20,024,400.00
23,133,375.00
-
1,978,656.00
367,131.60
500,000.00
184,568,462.01
184,568,000.00
u Rupiah
Ir. JUNAEDI
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jln. Pembangunan No. 179 Garut 44151
Kegiatan : -
LAPORAN KEMAJUAN
Pekerjaan : - PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 20 September 2012
………………………………………………………………………………..
PEMERINTAH DAERAH KABUPATEN GARUT ……………………………………………………………………..
DINAS PENDIDIKAN DAN KEBUDAYAAN SD NEGERI…………………………..
Jl. Pembangunan No. 179 Garut 44151 TAHUN ANGGARAN 2012
Jumlah 100.00 -
KETERANGAN :
Prestrasi fisik sampai minggu ini = - % Terhadap Bobot
Prestrasi fisik sampai minggu lalu = - % Terhadap Bobot
Kemajuan pekerjaan dalam minggu ini = - % Terhadap Bobot
Rencana prestrasi fisik sampai dengan minggu ini = #REF! % Menurut Time Schedule
Kemajuan / keterlambatan pekerjaan = #REF! %
……………………… ………………………………….
Pengawas Lapanngan Pelaksana Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jln. Pembangunan No. 179 Garut 44151
Kegiatan : -
LAPORAN KEMAJUAN
Pekerjaan : - PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 27 September 2012
………………………………………………………………………………..
PEMERINTAH DAERAH KABUPATEN GARUT ……………………………………………………………………..
DINAS PENDIDIKAN DAN KEBUDAYAAN SD NEGERI…………………………..
Jl. Pembangunan No. 179 Garut 44151 TAHUN ANGGARAN 2012
Jumlah 100.00 -
KETERANGAN :
Prestrasi fisik sampai minggu ini = - % Terhadap Bobot
Prestrasi fisik sampai minggu lalu = - % Terhadap Bobot
Kemajuan pekerjaan dalam minggu ini = - % Terhadap Bobot
Rencana prestrasi fisik sampai dengan minggu ini = #REF! % Menurut Time Schedule
Kemajuan / keterlambatan pekerjaan = #REF! %
……………………… ………………………………….
Pengawas Lapanngan Pelaksana Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jln. Pembangunan No. 179 Garut 44151
Kegiatan : -
LAPORAN KEMAJUAN
Pekerjaan : - PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 04 Oktober 2012
………………………………………………………………………………..
PEMERINTAH DAERAH KABUPATEN GARUT ……………………………………………………………………..
DINAS PENDIDIKAN DAN KEBUDAYAAN SD NEGERI…………………………..
Jl. Pembangunan No. 179 Garut 44151 TAHUN ANGGARAN 2012
Jumlah 100.00 -
KETERANGAN :
Prestrasi fisik sampai minggu ini = - % Terhadap Bobot
Prestrasi fisik sampai minggu lalu = - % Terhadap Bobot
Kemajuan pekerjaan dalam minggu ini = - % Terhadap Bobot
Rencana prestrasi fisik sampai dengan minggu ini = #REF! % Menurut Time Schedule
Kemajuan / keterlambatan pekerjaan = #REF! %
……………………… ………………………………….
Pengawas Lapanngan Pelaksana Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jln. Pembangunan No. 179 Garut 44151
Kegiatan : -
LAPORAN KEMAJUAN
Pekerjaan : - PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 11 Oktober 2012
………………………………………………………………………………..
PEMERINTAH DAERAH KABUPATEN GARUT ……………………………………………………………………..
DINAS PENDIDIKAN DAN KEBUDAYAAN SD NEGERI…………………………..
Jl. Pembangunan No. 179 Garut 44151 TAHUN ANGGARAN 2012
Jumlah 100.00 -
KETERANGAN :
Prestrasi fisik sampai minggu ini = - % Terhadap Bobot
Prestrasi fisik sampai minggu lalu = - % Terhadap Bobot
Kemajuan pekerjaan dalam minggu ini = - % Terhadap Bobot
Rencana prestrasi fisik sampai dengan minggu ini = #REF! % Menurut Time Schedule
Kemajuan / keterlambatan pekerjaan = #REF! %
……………………… ………………………………….
Pengawas Lapanngan Pelaksana Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jl. Pembangunan No. 179 Garut 44151
Kegiatan :
LAPORAN KEMAJUAN
Pekerjaan : PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
BULANAN
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 18 Oktober 2012
Serah Terima Pekerjaan : 28 Oktober 2012 Sisa Waktu : 10 Hari Kalender
MINGGU KE
NO KETERANGAN
V VI VII
KETERANGAN :
###
Waktu pelaksanaan sampai dengan saat ini : 35 Hari Kalender
###
Sisa waktu yang masih tersisa : 10 Hari Kalender
###
Sisa pekerjaan yang harus diselesaikan : 100.00 %
###
Sisa pekerjaan yang harus di capai Per - minggu : %
……………………………
Pengawas Lapangan
JADWAL PELAKSANAAN PEKERJAAN
…………………………………………………………………
…………………………………………………………..
SD NEGERI…………………………..
TAHUN ANGGARAN 2012
…………………………………. ……………………………
Pelaksana Lapangan Pengawas Lapangan
PEMERINTAH DAERAH KABUPATEN GARUT
DINAS PENDIDIKAN DAN KEBUDAYAAN
Jln. Pembangunan No. 179 Garut 44151
Kegiatan : -
LAPORAN KEMAJUAN
Pekerjaan : - PEKERJAAN FISIK
Lokasi : SD NEGERI…………………………..
Kontraktor Pelaksana :
Waktu Pelaksanaan : 45 ( Empat Puluh Lima ) Hari Kalender S/D Tanggal : 18 Oktober 2012
………………………………………………………………………………..
PEMERINTAH DAERAH KABUPATEN GARUT ……………………………………………………………………..
DINAS PENDIDIKAN DAN KEBUDAYAAN SD NEGERI…………………………..
Jl. Pembangunan No. 179 Garut 44151 TAHUN ANGGARAN 2012
Jumlah 100.00 -
KETERANGAN :
Prestrasi fisik sampai minggu ini = - % Terhadap Bobot
Prestrasi fisik sampai minggu lalu = - % Terhadap Bobot
Kemajuan pekerjaan dalam minggu ini = - % Terhadap Bobot
Rencana prestrasi fisik sampai dengan minggu ini = 79.88 % Menurut Time Schedule
Kemajuan / keterlambatan pekerjaan = (79.88) %
……………………… ………………………………….
Pengawas Lapanngan Pelaksana Lapangan
RENCANA ANGGARAN BIAYA (RAB)
PEMBANGUNAN RUANG KELAS BARU ( RKB) SMK AR- RIDWAN CINTAMULYA
DANA ALOKASI RKB TAHUN 2021
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 448.00 m2 16,000.00
2 Pengurugan Tanah Brangkal 115.50 m3 175,000.00
3 Pas. Bowplank/Pengukuran 48.00 m2 43,970.00
4 Penyediaan Makan Minum Pekerja 120.00 HK 150,000.00
5 Papan Nama 10.50 M2 203,410.00
Jumlah I
II PEK. GALIAN DAN URUGAN
1 Pek. Galian Tanah 546.05 m3 83,700.00
2 Pek. Urugan Kembali 5460.48 m3 22,570.00
3 Pek. Urugan Pasir Bawah Pondasi 0.00 m3 255,100.00
4 Pek. Urugan Pasir Bawah Lantai 165.00 m3 255,100.00
Jumlah II
III PEKERJAAN PONDASI
1 Pek. Aanstamping 16.74 m3 364,960.00
2 Pek. Pondasi Batu Kali 837.00 m3 847,670.00
3 Pek. Pondasi Batu Kali untuk Benteng Bangunan 82.67 m3 364,960.00
Jumlah III
IV PEKERJAAN BETON
1 Pekerjaan Pondasi Foot Plat 54.14 m3 1,331,890.00
2 Pekerjaan Sloof 30/40 75.33 m3 1,331,890.00
3 Pekerjaan Kolom Struktur 50/50 179.42 m3 1,402,700.00
4 Pekerjaan Balok Struktur 50/60 81.30 m3 1,405,940.00
5 Pekerjaan Kolom Selasar 40/40 16910.00 m3 1,402,700.00
6 Pekerjaan Plat Lantai 49.92 m3 1,500,450.00
7 Pekerjaan Balok Lintel 15/15 0.81 m3 1,331,890.00
Jumlah IV
V PEKERJAAN DINDING & PLESTERAN
1 Pasangan Dinding Bata 1:5 775.00 m2 63,220.00
2 Pekerjaan Acian Plesteran 1550.00 m2 57,660.00
Jumlah V
VI PEKERJAAN KUSEN, PINTU, JENDELA
1 Pasangan Kusen Pintu alumunium 8.00 m2 625,000.00
2 Pasangan Kusen Jendela alumunium 54.00 m2 575,000.00
Jumlah VI
VII PEERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 DN Putih 330.00 m2 185,840.00
Jumlah IX
VIII PEKERJAAN PENGECATAN
No Item Pekerjaan Vol Sat Harga Satuan (Rp)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 448.00 m2 16,000.00
2 Pengurugan Tanah Brangkal 115.50 m3 175,000.00
3 Pas. Bowplank/Pengukuran 48.00 m2 43,970.00
4 Penyediaan Makan Minum Pekerja 120.00 HK 150,000.00
5 Papan Nama 10.50 M2 203,410.00
Jumlah I
II PEK. GALIAN DAN URUGAN
1 Pek. Galian Tanah 546.05 m3 83,700.00
2 Pek. Urugan Kembali 5460.48 m3 22,570.00
3 Pek. Urugan Pasir Bawah Pondasi 0.00 m3 255,100.00
4 Pek. Urugan Pasir Bawah Lantai 165.00 m3 255,100.00
Jumlah II
III PEKERJAAN PONDASI
1 Pek. Aanstamping 16.74 m3 364,960.00
2 Pek. Pondasi Batu Kali 837.00 m3 847,670.00
3 Pek. Pondasi Batu Kali untuk Benteng Bangunan 82.67 m3 364,960.00
Jumlah III
IV PEKERJAAN BETON
1 Pekerjaan Pondasi Foot Plat 54.14 m3 1,331,890.00
2 Pekerjaan Sloof 30/40 75.33 m3 1,331,890.00
3 Pekerjaan Kolom Struktur 50/50 179.42 m3 1,402,700.00
4 Pekerjaan Balok Struktur 50/60 81.30 m3 1,405,940.00
5 Pekerjaan Kolom Selasar 40/40 16910.00 m3 1,402,700.00
6 Pekerjaan Plat Lantai 49.92 m3 1,500,450.00
7 Pekerjaan Balok Lintel 15/15 0.81 m3 1,331,890.00
Jumlah IV
V PEKERJAAN DINDING & PLESTERAN
1 Pasangan Dinding Bata 1:5 775.00 m2 63,220.00
2 Pekerjaan Acian Plesteran 1550.00 m2 57,660.00
Jumlah V
VI PEKERJAAN KUSEN, PINTU, JENDELA
1 Pasangan Kusen Pintu alumunium 8.00 m2 625,000.00
2 Pasangan Kusen Jendela alumunium 54.00 m2 575,000.00
Jumlah VI
VII PEERJAAN LANTAI
1 Pas. Lantai Keramik 40x40 DN Putih 330.00 m2 185,840.00
Jumlah IX
VIII PEKERJAAN PENGECATAN
No Item Pekerjaan Vol Sat Harga Satuan (Rp) J