HARGA SEWA
NO. PERALATAN SATUAN ALAT KET.
(Rp)
15 Molen hr 250,000
2 Mandor Hr 80,000
10 T u k a n g c a t Hr 75,000
11 K e p . t k . c a t Hr 80,000
12 T u k a n g p l i t u r Hr 75,000
13 T u k a n g g a l i Hr 75,000
14 M a n d o r P i p a Hr 75,000
15 T k . P i p a Hr 65,000
16 P e k e r j a . P i p a Hr 55,000
17 T k . l e i d e n g Hr 70,000
19 Geologist Hr 60,000
20 Administrasi Hr 50,000
21 Logistik Hr 50,000
23 Mekanik Hr 60,000
24 C r e w Hr 50,000
25 Pengemudi Hr 40,000
27 P e n j a g a m a l a m Hr 40,000
KABUPATEN JEPARA
Ir. ASHAR EKANTO
NIP. 19620921 199503 1 001
DAFTAR HARGA SATUAN BAHAN BANGUNAN
KABUPATEN JEPARA TAHUN 2016
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
I. B A H A N DASAR
1 BATU KALI
Pecah 15/20 m3 149,400
Pecah 5/7 m3 191,900
Pecah 3/5 m3 191,900
2 KERIKIL Timbun/Sirtu m3 106,100
Beton/Ciping 0,5/1 m3 189,400
Beton ,1/2 m3 217,100
Beton ,2/3 m3 215,900
Abu batu m3 172,700
AGREGAT (ANALISA SARINGAN)
Agr.Base Kelas A m3 173,000
Agr.Base Kelas B m3 167,800
Lolos screen2 ukuran ( 0 - 5) m3 178,300
Lolos screen2 ukuran ( 5 - 9,5) m3 157,800
Lolos screen2 ukuran ( 9.5 - 19,0) m3 141,400
3 BATU BATA Kudus bh 760
Kalipucang/Clering bh 530
4 PASIR Urug m3 82,000
Pasang lokal m3 177,400
Beton/Muntilan m3 385,000
5 TANAH Padas m3 60,600
Liat/tanah merah m3 45,400
6 KAPUR Pasang m3 402,800
Semen Merah m3 172,500
7 PORTLAND CEMENT
Semen PC kg 1,410
Semen Putih kg 2,180
Semen warna kg 12,000
3 ASBES GELOMBANG
Asbes Gelombang Besar bh 83,000
Asbes Gelombang Kecil bh 36,200
NOK Jabes nok bh 28,000
. Stel Asbes bh 30,000
4 ASBES PLAT
. 100cm X 100 cm X 4 mm bh 25,700
PC warna 30 X 30 cm bh 3,700
20 X 20 cm bh 1,900
Teraso 30 X 30 cm bh 3,800
60 x 60 cm bh 55,800
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
V.BAHAN CETAK
1 BUIS BETON
Ø 20 cm - 100 cm bh 56,100
Ø 30 cm - 100 cm bh 81,100
Ø 60 cm - 100 cm bh 179,100
Ø 80 cm - 100 cm bh 275,000
Ø 100 cm - 100 cm bh 383,300
U 15 cm - 100 cm bh 38,700
U 20 cm - 100 cm bh 46,200
U 30 cm - 100 cm bh 60,000
VI . B A H A N B E S I
1 BESI BETON besi beton polos/Ulir kg 8,700
besi beton prestress kg 16,000
VII . B A H A N P I P A
1 Pipa PVC AW
Pipa PVC DN 20 ( ½" ) AW m' 5,400
Pipa PVC DN 25 ( ¾" ) AW m' 6,900
Pipa PVC DN 32 ( 1" ) AW m' 8,700
Pipa PVC DN 40 ( 1½" ) AW m' 13,700
Pipa PVC DN 63 ( 2" ) AW m' 20,000
Pipa PVC DN 90 ( 3" ) AW m' 38,700
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
VIII . B A H A N L A N G I T - L A N G I T
1 List Kayu Profil m' 3,900
2 SOFT BOARD-uk: 4'X 8'
Gypsum tebal 9 mm lbr 64,300
Liat Gypsum m' 25,000
3 PLY WOOD
Teak wood
. 90 X 210 X 4 mm lbr 80,000
Tripleks
. 120 X 240 X 3 mm lbr 47,500
. 120 X 240 X 4 mm lbr 58,000
. 120 X 240 X 6 mm lbr 71,300
. 120 X 240 X 9 mm lbr 105,400
Multipleks
. 120 X 240 X 9 mm lbr 102,000
4 KalsiBoard
. 120 X 240 X 3,5 mm lbr 53,400
. 120 X 240 X 4,5 mm lbr 61,300
5 Formika ukuran pintu lbr 58,000
IX . B A H A N F I N I S H I N G
1 KAYU
Menie kg 29,000
Dempul plamur kg 32,800
Ambril/amplas lbr 6,400
Cat dasar kg 33,500
cat kayu kg 51,700
Kuas bh 13,200
Sirlak ons 16,900
Spiritus ltr 12,000
Vernish ltr 27,900
2 TEMBOK
Kalkarium kg 6,900
Kapur sirih kg 6,600
Plamur kg 17,500
Undercoat/cat dasar kg 19,000
Cat Tembok Decolite kg 20,200
Mowilex Dalam Ruangan kg 54,500
Mowilex Luar Ruangan kg 83,600
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
3 BESI
Menie kg 30,600
Cat besi kg 57,600
Minyak cat/Afduner ltr 20,000
Residu (teer/aspal) drum 68,000
Fibre glass (tanki air)
kapasitas 550 liter. bh 855,700
kapasitas 1100 liter. bh 1,506,400
Lem Aica Aibon kg 35,000
X.BAHAN KACA
1 POLOS 3 mm m2 71,200
5 mm m2 85,000
8 mm m3 140,000
8 LAIN - LAIN
Kran Air bh 25,700
Seal tape bh 4,100
Floor drain bh 23,100
Water drain bh 60,000
XIV . ALAT PENGIKAT KAYU
1 PAKU - ukuran 1" s/d 5" kg 12,800
2 PAKU - sekrup kg 13,000
3 PAKU - sekrup fizzer bh 1,600
4 PAKU - sumbat / kait kg 7,500
5 MUR BAUT (kuda-kuda) kg 16,000
6 ANGKUR BAUT bh 14,000
7 LEM KAYU bh 12,800
8 Tali Ijuk kg 23,600
X V . PAVING BLOCK
1 Blok pafing tebal 6 cm lokal m2 55,300
2 Blok pafing tebal 8 cm lokal m2 75,000
3 Blok pafing warna tebal 6 cm lokal m2 51,000
4 Blok pafing warna tebal 8 cm lokal m2 57,500
5 Blok pafing blok tebal 6 cm K.225 Holand m2 85,000
Blok pafing blok tebal 6 cm K.225 Hexagonal m2 87,000
6 Blok pafing blok tebal 8 cm K.300 Holland m2 125,000
Blok pafing blok tebal 8 cm K.300 Unipave/Hexagonal m2 127,000
Blok pafing blok tebal 8 cm K.300 Grassblock m2 140,000
7 Blok pafing blok tebal 8 cm K.400 Holland m2 140,000
Blok pafing blok tebal 8 cm K.400 Unipave/Hexagonal m2 142,000
8 KANSTEEN 15/20x30x50 bh 50,000
9 BATACO bh 4,500
10 Glass blox bh 22,600
XVI. L A I N - L A I N
1 Rel Pintu dorong bh 216,200
2 Naco per Daun bh 11,500
3 Rolling door Besi m2 350,000
4 Rolling door Almunium m2 364,000
5 Awning Almunium m2 190,000
6 Profil Alumunium m' 103,200
7 Alumunium strip m' 34,300
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
21 "Accessories"
Float Valve 2" Bh 950,000
Doble neple GI dia 3/4" Bh 1,800
Tee all socket GI dia 3/4" Bh 4,600
Valve socket GI dia 3/4" Bh 2,600
Kran stainless steel Bh 18,600
Verlop ring 1 " x 3/4" Bh 8,300
Sock GIP dia 1" Bh 3,300
Sock GIP dia 3/4" Bh 2,600
Tee faucet dia 20 mm PVC Bh 5,400
Bend faucet dia 20 mm PVC Bh 3,400
Submersible pump 5.5 KW/1 Phase Unit 29,508,000
Submersible pump 11 KW/3 Phase Unit 53,655,900
Panel submersible pump 5.5 KW Unit 2,864,600
Panel submersible pump 11 KW Unit 4,688,400
Submersible pump 2.2 KW/1 Phase Unit 22,325,600
Panel submersible pump 2.2 KW Unit 2,232,600
Bend all sock GIP diameter 3" Bh 21,400
Tee all sock GIP diameter 3" Bh 17,900
Pasang tangga bahan pipa GIP dn 1" Bh 198,500
Tutup man hole & tutup pengaman lengkap 3 mm Unit 297,700
Speed Kran DN 20 mm Bh 18,600
Gate Valev DN 50 mm Bh 168,700
Flends diameter 150 mm Bh 99,200
Pelurus / Centering tiap 30 mm set 36,000
Reduser DN 100 x 150 mm set 509,300
Filter Grevel m3 180,000
Grouting m 480,300
Tangki fiberglas kapasitas 1 m3 m' 3,959,100
Tangki fiberglas kapasitas 2 m3 m' 4,688,400
22 "Pembuatan Sumur Produksi"
Solar ltr 5,900
Olie ltr 35,300
Bentonite kg 11,400
Veet/grease kg 33,100
Gravel pack m3 173,900
Kawat las btg 900
Pipa jambang diameter 8" ( GI) m' 578,400
Pipa jambang diameter 6" (GI) m' 323,200
Pipa buta diamter 6" ( GI ) m' 310,000
Pipa buta diamter 4" (GI ) m' 283,500
HARGA
BAHAN
NO. J E N I S B A H A N SATUAN KETERANGAN
(Rp)
HARGA
NO. URAIAN PEKERJAAN SAT KODE SATUAN
(Rp)
26 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 20 cm m' A.5.1.1.33 382,209.30
27 Pemasangan Pipa Air Limbah Jenis Pipa Tanah Ø 15 cm m' A.5.1.1.34 219,674.48
Jepara, 2016
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
I A. 2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
A Tenaga
AHSP-SDA Pekerja L.01 OH 0.0750 65,000.00 4,875.00
Mandor L.04 OH 0.0075 80,000.00 600.00
5,475.00
B Bahan
Minyak tanah ltr 0.010 13,500.00 135.00
135.00
C PERALATAN
D Jumlah A + B + C 5,610.00
E Overhead & Profit 12.5% 701.25
F Harga Satuan Pekerjaan (D+E) 6,311.25
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
II A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
2 A.4.4.1.3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 26.55 1,410.00 37,435.50
Pasir Muntilan m3 0.093 385,000.00 35,805.00
179,640.50
C PERALATAN
D Jumlah A + B + C 237,640.50
E Overhead & Profit 12.5% 29,705.06
F Harga Satuan Pekerjaan (D+E) 267,345.56
3 A.4.4.1.4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Portland Semen (PC) Kg 22.2 1,410.00 31,302.00
Pasir Muntilan m3 0.102 385,000.00 39,270.00
176,972.00
C PERALATAN
D Jumlah A + B + C 234,972.00
E Overhead & Profit 12.5% 29,371.50
F Harga Satuan Pekerjaan (D+E) 264,343.50
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
4 A.4.4.1.5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 18.5 1,410.00 26,085.00
Pasir Muntilan m3 0.122 385,000.00 46,970.00
179,455.00
C PERALATAN
D Jumlah A + B + C 237,455.00
E Overhead & Profit 12.5% 29,681.88
F Harga Satuan Pekerjaan (D+E) 267,136.88
5 A.4.4.1.8 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 14.37 1,410.00 20,261.70
Pasir Muntilan m3 0.04 385,000.00 15,400.00
88,861.70
C PERALATAN
D Jumlah A + B + C 117,861.70
E Overhead & Profit 12.5% 14,732.71
F Harga Satuan Pekerjaan (D+E) 132,594.41
6 A.4.4.1.9 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 11.50 1,410.00 16,215.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Pasir Muntilan m3 0.043 385,000.00 16,555.00
85,970.00
C PERALATAN
D Jumlah A + B + C 114,970.00
E Overhead & Profit 12.5% 14,371.25
F Harga Satuan Pekerjaan (D+E) 129,341.25
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
7 A.4.4.1.10 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 9.68 1,410.00 13,648.80
Pasir Muntilan m3 0.045 385,000.00 17,325.00
84,173.80
C PERALATAN
D Jumlah A + B + C 113,173.80
E Overhead & Profit 12.5% 14,146.73
F Harga Satuan Pekerjaan (D+E) 127,320.53
8 A.4.4.1.11 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 8.32 1,410.00 11,731.20
Pasir Muntilan m3 0.049 385,000.00 18,865.00
83,796.20
C PERALATAN
D Jumlah A + B + C 112,796.20
E Overhead & Profit 12.5% 14,099.53
F Harga Satuan Pekerjaan (D+E) 126,895.73
9 A.4.4.1.12 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 6.50 1,410.00 9,165.00
Pasir Muntilan m3 0.05 385,000.00 19,250.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
81,615.00
C PERALATAN
D Jumlah A + B + C 110,615.00
E Overhead & Profit 12.5% 13,826.88
F Harga Satuan Pekerjaan (D+E) 124,441.88
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
10 A.4.4.1.23 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Terawang / Roster Buah 30 3,800.00 114,000.00
Portland Semen kg 11 1,410.00 15,510.00
Pasir Muntilan m3 0.035 385,000.00 13,475.00
142,985.00
C PERALATAN
D Jumlah A + B + C 171,985.00
E Overhead & Profit 12.5% 21,498.13
F Harga Satuan Pekerjaan (D+E) 193,483.13
11 A.4.4.1.2.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 32.95 1,410.00 46,459.50
Pasir Pasang lokal m3 0.091 177,400.00 16,143.40
169,002.90
C PERALATAN
D Jumlah A + B + C 227,002.90
E Overhead & Profit 12.5% 28,375.36
F Harga Satuan Pekerjaan (D+E) 255,378.26
12 A.4.4.1.3.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 26.55 1,410.00 37,435.50
Pasir Pasang lokal m3 0.093 177,400.00 16,498.20
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
160,333.70
C PERALATAN
D Jumlah A + B + C 218,333.70
E Overhead & Profit 12.5% 27,291.71
F Harga Satuan Pekerjaan (D+E) 245,625.41
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
13 A.4.4.1.4.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 22.2 1,410.00 31,302.00
Pasir Pasang lokal m3 0.102 177,400.00 18,094.80
155,796.80
C PERALATAN
D Jumlah A + B + C 213,796.80
E Overhead & Profit 12.5% 26,724.60
F Harga Satuan Pekerjaan (D+E) 240,521.40
14 A.4.4.1.5.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 140 760.00 106,400.00
Portland Semen (PC) Kg 18.5 1,410.00 26,085.00
Pasir Pasang lokal m3 0.122 177,400.00 21,642.80
154,127.80
C PERALATAN
D Jumlah A + B + C 212,127.80
E Overhead & Profit 12.5% 26,515.98
F Harga Satuan Pekerjaan (D+E) 238,643.78
15 A.4.4.1.8.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 14.37 1,410.00 20,261.70
Pasir Pasang lokal m3 0.04 177,400.00 7,096.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
80,557.70
C PERALATAN
D Jumlah A + B + C 109,557.70
E Overhead & Profit 12.5% 13,694.71
F Harga Satuan Pekerjaan (D+E) 123,252.41
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
16 A.4.4.1.9.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 11.50 1,410.00 16,215.00
Pasir Pasang lokal m3 0.043 177,400.00 7,628.20
77,043.20
C PERALATAN
D Jumlah A + B + C 106,043.20
E Overhead & Profit 12.5% 13,255.40
F Harga Satuan Pekerjaan (D+E) 119,298.60
17 A.4.4.1.10.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 9.68 1,410.00 13,648.80
Pasir Pasang lokal m3 0.045 177,400.00 7,983.00
74,831.80
C PERALATAN
D Jumlah A + B + C 103,831.80
E Overhead & Profit 12.5% 12,978.98
F Harga Satuan Pekerjaan (D+E) 116,810.78
18 A.4.4.1.11.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 8.32 1,410.00 11,731.20
Pasir Pasang lokal m3 0.049 177,400.00 8,692.60
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
73,623.80
C PERALATAN
D Jumlah A + B + C 102,623.80
E Overhead & Profit 12.5% 12,827.98
F Harga Satuan Pekerjaan (D+E) 115,451.78
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
19 A.4.4.1.12.1 Pemasangan Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah 5 x 11 x 22 Buah 70 760.00 53,200.00
Portland Semen Kg 6.50 1,410.00 9,165.00
Pasir Pasang lokal m3 0.05 177,400.00 8,870.00
71,235.00
C PERALATAN
D Jumlah A + B + C 100,235.00
E Overhead & Profit 12.5% 12,529.38
F Harga Satuan Pekerjaan (D+E) 112,764.38
20 A.4.4.1.23.1 Pemasangan Dinding Terawang (Rooster) Uk, (12x11x24)cm Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Terawang / Roster Buah 30 3,800.00 114,000.00
Portland Semen kg 11 1,410.00 15,510.00
Pasir Pasang lokal m3 0.035 177,400.00 6,209.00
135,719.00
C PERALATAN
D Jumlah A + B + C 164,719.00
E Overhead & Profit 12.5% 20,589.88
F Harga Satuan Pekerjaan (D+E) 185,308.88
21 A.4.4.1.2.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 32.95 1,410.00 46,459.50
Pasir Muntilan m3 0.091 385,000.00 35,035.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
160,994.50
C PERALATAN
D Jumlah A + B + C 218,994.50
E Overhead & Profit 12.5% 27,374.31
F Harga Satuan Pekerjaan (D+E) 246,368.81
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
22 A.4.4.1.3.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 26.55 1,410.00 37,435.50
Pasir Muntilan m3 0.093 385,000.00 35,805.00
152,740.50
C PERALATAN
D Jumlah A + B + C 210,740.50
E Overhead & Profit 12.5% 26,342.56
F Harga Satuan Pekerjaan (D+E) 237,083.06
23 A.4.4.1.4.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 22.2 1,410.00 31,302.00
Pasir Muntilan m3 0.102 385,000.00 39,270.00
150,072.00
C PERALATAN
D Jumlah A + B + C 208,072.00
E Overhead & Profit 12.5% 26,009.00
F Harga Satuan Pekerjaan (D+E) 247,072.00
24 A.4.4.1.5.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 18.5 1,410.00 26,085.00
Pasir Muntilan m3 0.122 385,000.00 46,970.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
152,555.00
C PERALATAN
D Jumlah A + B + C 210,555.00
E Overhead & Profit 12.5% 26,319.38
F Harga Satuan Pekerjaan (D+E) 236,874.38
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
25 A.4.4.1.8.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 14.37 1,410.00 20,261.70
Pasir Muntilan m3 0.04 385,000.00 15,400.00
75,411.70
C PERALATAN
D Jumlah A + B + C 104,411.70
E Overhead & Profit 12.5% 13,051.46
F Harga Satuan Pekerjaan (D+E) 117,463.16
26 A.4.4.1.9.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 11.50 1,410.00 16,215.00
Pasir Muntilan m3 0.043 385,000.00 16,555.00
72,520.00
C PERALATAN
D Jumlah A + B + C 101,520.00
E Overhead & Profit 12.5% 12,690.00
F Harga Satuan Pekerjaan (D+E) 114,210.00
27 A.4.4.1.10.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 9.68 1,410.00 13,648.80
Pasir Muntilan m3 0.045 385,000.00 17,325.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
70,723.80
C PERALATAN
D Jumlah A + B + C 99,723.80
E Overhead & Profit 12.5% 12,465.48
F Harga Satuan Pekerjaan (D+E) 112,189.28
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
28 A.4.4.1.11.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 8.32 1,410.00 11,731.20
Pasir Muntilan m3 0.049 385,000.00 18,865.00
70,346.20
C PERALATAN
D Jumlah A + B + C 99,346.20
E Overhead & Profit 12.5% 12,418.28
F Harga Satuan Pekerjaan (D+E) 111,764.48
29 A.4.4.1.12.2 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 6.50 1,410.00 9,165.00
Pasir Muntilan m3 0.05 385,000.00 19,250.00
68,165.00
C PERALATAN
D Jumlah A + B + C 97,165.00
E Overhead & Profit 12.5% 12,145.63
F Harga Satuan Pekerjaan (D+E) 109,310.63
30 A.4.4.1.2.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 32.95 1,410.00 46,459.50
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Pasir Pasang Lokal m3 0.091 177,400.00 16,143.40
142,102.90
C PERALATAN
D Jumlah A + B + C 200,102.90
E Overhead & Profit 12.5% 25,012.86
F Harga Satuan Pekerjaan (D+E) 225,115.76
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
31 A.4.4.1.3.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 26.55 1,410.00 37,435.50
Pasir Pasang Lokal m3 0.093 177,400.00 16,498.20
133,433.70
C PERALATAN
D Jumlah A + B + C 191,433.70
E Overhead & Profit 12.5% 23,929.21
F Harga Satuan Pekerjaan (D+E) 215,362.91
32 A.4.4.1.4.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 22.2 1,410.00 31,302.00
Pasir Pasang Lokal m3 0.102 177,400.00 18,094.80
128,896.80
C PERALATAN
D Jumlah A + B + C 186,896.80
E Overhead & Profit 12.5% 23,362.10
F Harga Satuan Pekerjaan (D+E) 225,896.80
33 A.4.4.1.5.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.6 65,000.00 39,000.00
Tukang Batu L.02 OH 0.2 75,000.00 15,000.00
Kepala Tukang Batu L.03 OH 0.02 80,000.00 1,600.00
Mandor L.04 OH 0.03 80,000.00 2,400.00
58,000.00
B Bahan
Bata Merah Buah 150 530.00 79,500.00
Portland Semen (PC) Kg 18.5 1,410.00 26,085.00
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Pasir Pasang Lokal m3 0.122 177,400.00 21,642.80
127,227.80
C PERALATAN
D Jumlah A + B + C 185,227.80
E Overhead & Profit 12.5% 23,153.48
F Harga Satuan Pekerjaan (D+E) 208,381.28
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
34 A.4.4.1.8.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 3PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 14.37 1,410.00 20,261.70
Pasir Pasang Lokal m3 0.04 177,400.00 7,096.00
67,107.70
C PERALATAN
D Jumlah A + B + C 96,107.70
E Overhead & Profit 12.5% 12,013.46
F Harga Satuan Pekerjaan (D+E) 108,121.16
35 A.4.4.1.9.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 4PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 11.50 1,410.00 16,215.00
Pasir Pasang Lokal m3 0.043 177,400.00 7,628.20
63,593.20
C PERALATAN
D Jumlah A + B + C 92,593.20
E Overhead & Profit 12.5% 11,574.15
F Harga Satuan Pekerjaan (D+E) 104,167.35
36 A.4.4.1.10.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 5PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 9.68 1,410.00 13,648.80
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Pasir Pasang Lokal m3 0.045 177,400.00 7,983.00
61,381.80
C PERALATAN
D Jumlah A + B + C 90,381.80
E Overhead & Profit 12.5% 11,297.73
F Harga Satuan Pekerjaan (D+E) 101,679.53
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
37 A.4.4.1.11.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 6PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 8.32 1,410.00 11,731.20
Pasir Pasang Lokal m3 0.049 177,400.00 8,692.60
60,173.80
C PERALATAN
D Jumlah A + B + C 89,173.80
E Overhead & Profit 12.5% 11,146.73
F Harga Satuan Pekerjaan (D+E) 100,320.53
38 A.4.4.1.12.3 Pemasangan Dinding Bata Merah Kalipucang Tebal 1/2 Bata Camp. 1SP : 8PP
A Tenaga
Pekerja L.01 OH 0.30 65,000.00 19,500.00
Tukang Batu L.02 OH 0.1 75,000.00 7,500.00
Kepala Tukang L.03 OH 0.01 80,000.00 800.00
Mandor L.04 OH 0.015 80,000.00 1,200.00
29,000.00
B Bahan
Bata Merah Buah 75 530.00 39,750.00
Portland Semen Kg 6.50 1,410.00 9,165.00
Pasir Pasang Lokal m3 0.05 177,400.00 8,870.00
57,785.00
C PERALATAN
D Jumlah A + B + C 86,785.00
E Overhead & Profit 12.5% 10,848.13
F Harga Satuan Pekerjaan (D+E) 97,633.13
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
V A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
1 A.4.4.2.3 Pemasangan Plesteran 1 Pc : 3 Pp muntilan Tebal 15 mm
A Tenaga
Pekerja L.01 OH 0.3000 65,000.00 19,500.00
Tukang batu L.02 OH 0.1500 75,000.00 11,250.00
Kepala Tukang L.03 OH 0.0150 80,000.00 1,200.00
Mandor L.04 OH 0.0150 80,000.00 1,200.00
33,150.00
B Bahan
Portland Semen Kg 7.7760 1,410.00 10,964.16
Pasir Muntilan m3 0.0230 385,000.00 8,855.00
19,819.16
C PERALATAN
D Jumlah A + B + C 52,969.16
E Overhead & Profit 12.5% 6,621.15
F Harga Satuan Pekerjaan (D+E) 59,590.31
19 A.4.4.2.24 Pemasangan Finishing Siar Pasangan Dinding Bata Merah (=20 m')
A Tenaga
Pekerja L.01 OH 0.1500 65,000.00 9,750.00
Tukang batu L.02 OH 0.0750 75,000.00 5,625.00
Kepala Tukang L.03 OH 0.0080 80,000.00 640.00
Mandor L.04 OH 0.0080 80,000.00 640.00
16,655.00
B Bahan
Portland Semen Kg 3.1080 1,410.00 4,382.28
4,382.28
C PERALATAN
D Jumlah A + B + C 21,037.28
E Overhead & Profit 12.5% 2,629.66
F Harga Satuan Pekerjaan (D+E) 23,666.94
20 A.4.4.2.26 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Muntilan
A Tenaga
Pekerja L.01 OH 0.3000 65,000.00 19,500.00
Tukang batu L.02 OH 0.1500 75,000.00 11,250.00
Kepala Tukang L.03 OH 0.0150 80,000.00 1,200.00
Mandor L.04 OH 0.0150 80,000.00 1,200.00
33,150.00
B Bahan
Pc Kg 6.3400 1,410.00 8,939.40
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
PP Muntilan m3 0.0120 385,000.00 4,620.00
13,559.40
C PERALATAN
D Jumlah A + B + C 46,709.40
E Overhead & Profit 12.5% 5,838.68
F Harga Satuan Pekerjaan (D+E) 52,548.08
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
21 A.4.4.2.26.1 Pemasangan Finishing Siar Pas.Batu Kali Adukan 1Pc : 2PP Lokal
A Tenaga
Pekerja L.01 OH 0.3000 65,000.00 19,500.00
Tukang batu L.02 OH 0.1500 75,000.00 11,250.00
Kepala Tukang L.03 OH 0.0150 80,000.00 1,200.00
Mandor L.04 OH 0.0150 80,000.00 1,200.00
33,150.00
B Bahan
Pc Kg 6.3400 1,410.00 8,939.40
PP Lokal m3 0.0120 177,400.00 2,128.80
11,068.20
C PERALATAN
D Jumlah A + B + C 44,218.20
E Overhead & Profit 12.5% 5,527.28
F Harga Satuan Pekerjaan (D+E) 49,745.48
2 A.4.6.1.2 Pembuatan & Pemasangan 1 m3 Kosen Pintu & Jendela Kayu kamfer
A Tenaga
Pekerja L.01 OH 6.0000 65,000.00 390,000.00
Tukang Kayu L.02 OH 18.0000 75,000.00 1,350,000.00
Kepala Tukang L.03 OH 1.8000 80,000.00 144,000.00
Mandor L.04 OH 0.3000 80,000.00 24,000.00
1,908,000.00
B Bahan
Kayu Klas II (kamfer) m3 1.2000 8,116,300.00 9,739,560.00
Paku Biasa 2" - 5 " kg 1.2500 12,800.00 16,000.00
Lem Kayu kg 1.0000 12,800.00 12,800.00
9,768,360.00
C PERALATAN
D Jumlah A + B + C 11,676,360.00
E Overhead & Profit 12.5% 1,459,545.00
F Harga Satuan Pekerjaan (D+E) 13,135,905.00
5 A.4.6.1.6 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu Jati
A Tenaga
Pekerja L.01 OH 0.8000 65,000.00 52,000.00
Tukang Kayu L.02 OH 2.4000 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.2400 80,000.00 19,200.00
Mandor L.04 OH 0.0400 80,000.00 3,200.00
254,400.00
B Bahan
Kayu jati, papan m3 0.0240 16,875,000.00 405,000.00
Lem Kayu kg 0.3000 12,800.00 3,840.00
408,840.00
C PERALATAN
D Jumlah A + B + C 663,240.00
E Overhead & Profit 12.5% 82,905.00
F Harga Satuan Pekerjaan (D+E) 746,145.00
6 A.4.6.1.6.1 Pembuatan & Pemasangan 1 m2 Pintu & Jendela Kaca Kayu kamfer
A Tenaga
Pekerja L.01 OH 0.8000 65,000.00 52,000.00
Tukang Kayu L.02 OH 2.4000 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.2400 80,000.00 19,200.00
Mandor L.04 OH 0.0400 80,000.00 3,200.00
254,400.00
B Bahan
Kayu kamfer m3 0.0240 8,116,300.00 194,791.20
Lem Kayu kg 0.3000 12,800.00 3,840.00
198,631.20
C PERALATAN
D Jumlah A + B + C 453,031.20
E Overhead & Profit 12.5% 56,628.90
F Harga Satuan Pekerjaan (D+E) 509,660.10
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
7 A.4.6.1.8 Pembuatan&Pemasangan 1 m2 Pintu kayu lapis (Plywood) Rangkap rangka Kayu Klas II (lbr s/d 90 cm)
A Tenaga
Pekerja L.01 OH 0.7000 65,000.00 45,500.00
Tukang Kayu L.02 OH 2.1000 75,000.00 157,500.00
Kepala Tukang L.03 OH 0.2100 80,000.00 16,800.00
Mandor L.04 OH 0.0350 80,000.00 2,800.00
222,600.00
B Bahan
Kayu Klas II (Kamfer) m3 0.0250 8,116,300.00 202,907.50
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu Ltr 0.5000 12,800.00 6,400.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00 80,000.00
289,691.50
C PERALATAN
D Jumlah A + B + C 512,291.50
E Overhead & Profit 12.5% 64,036.44
F Harga Satuan Pekerjaan (D+E) 576,327.94
8 A.4.6.1.9 Pembuatan&Pemasangan 1 m2 Pintu Plywood rangkap, rangka expose kayu klas I atau II
A Tenaga
Pekerja L.01 OH 0.8000 65,000.00 52,000.00
Tukang Kayu L.02 OH 2.4000 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.2400 80,000.00 19,200.00
Mandor L.04 OH 0.0400 80,000.00 3,200.00
254,400.00
B Bahan
Kayu Klas II (Kamfer) m3 0.0256 8,116,300.00 207,777.28
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu Ltr 0.5000 12,800.00 6,400.00
Plywood tebal 4 mm uk.90x220cm Lbr 1.0000 80,000.00 80,000.00
294,561.28
C PERALATAN
D Jumlah A + B + C 548,961.28
E Overhead & Profit 12.5% 68,620.16
F Harga Satuan Pekerjaan (D+E) 617,581.44
9 A.4.6.1.10 Pembuatan & Pemasangan 1 m2 Jalusi mati Kosen Kayu Klas I atau II
A Tenaga
Pekerja L.01 OH 0.6700 65,000.00 43,550.00
Tukang Kayu L.02 OH 2.0000 75,000.00 150,000.00
Kepala Tukang L.03 OH 0.2000 80,000.00 16,000.00
Mandor L.04 OH 0.3350 80,000.00 26,800.00
236,350.00
B Bahan
Kayu Klas I Bengkirai) m3 0.0600 8,946,200.00 536,772.00
Paku Biasa 1/2" - 1" Kg 0.1500 12,800.00 1,920.00
538,692.00
C PERALATAN
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 775,042.00
E Overhead & Profit 12.5% 96,880.25
F Harga Satuan Pekerjaan (D+E) 871,922.25
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
10 A.4.6.1.11 Pembuatan & Pemasangan 1 m2 Pintu Teakwood Rangkap, Rangka Expose Kayu Klas I
A Tenaga
Pekerja L.01 OH 0.8000 65,000.00 52,000.00
Tukang Kayu L.02 OH 2.4000 75,000.00 180,000.00
Kepala Tukang L.03 OH 0.2400 80,000.00 19,200.00
Mandor L.04 OH 0.0400 80,000.00 3,200.00
254,400.00
B Bahan
Kayu Klas I (Bengkirai) m3 0.0250 8,946,200.00 223,655.00
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu kg 0.3000 12,800.00 3,840.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00 80,000.00
307,879.00
C PERALATAN
D Jumlah A + B + C 562,279.00
E Overhead & Profit 12.5% 70,284.88
F Harga Satuan Pekerjaan (D+E) 632,563.88
11 A.4.6.1.12 Pembuatan&Pemasangan 1 m2 Pintu Teakwood Rangkap Lapis Formika,Rangka expose Kayu Klas II
A Tenaga
Pekerja L.01 OH 0.8500 65,000.00 55,250.00
Tukang Kayu L.02 OH 2.5500 75,000.00 191,250.00
Kepala Tukang L.03 OH 0.2550 80,000.00 20,400.00
Mandor L.04 OH 0.0430 80,000.00 3,440.00
270,340.00
B Bahan
Kayu Klas II (Kamfer) m3 0.0250 8,116,300.00 202,907.50
Paku Biasa 1/2" - 1" Kg 0.0300 12,800.00 384.00
Lem Kayu kg 0.0800 12,800.00 1,024.00
Teakwood (90 x 220) cm x 4 mm Lbr 1.0000 80,000.00 80,000.00
Formika Lbr 0.5000 58,000.00 29,000.00
313,315.50
C PERALATAN
D Jumlah A + B + C 583,655.50
E Overhead & Profit 12.5% 72,956.94
F Harga Satuan Pekerjaan (D+E) 656,612.44
19 A.4.6.1.20 Pemasangan 1 m2 Rangka Langit-langit (60x60) cm, kayu Klas II atau III
A Tenaga
Pekerja L.01 OH 0.2000 65,000.00 13,000.00
Tukang Kayu L.02 OH 0.3000 75,000.00 22,500.00
Kepala Tukang L.03 OH 0.0300 80,000.00 2,400.00
Mandor L.04 OH 0.0100 80,000.00 800.00
38,700.00
B Bahan
Kayu Klas II (Kruing) m3 0.0163 6,582,500.00 107,294.75
Paku Biasa 2" - 5" Kg 0.2500 12,800.00 3,200.00
110,494.75
C PERALATAN
D Jumlah A + B + C 149,194.75
E Overhead & Profit 12.5% 18,649.34
F Harga Satuan Pekerjaan (D+E) 167,844.09
21 A.4.6.1.22 Pemasangan 1 m' Listplank Uk. (3x30)cm Kayu klas I atau klas II
A Tenaga
Pekerja L.01 OH 0.1000 65,000.00 6,500.00
Tukang Kayu L.02 OH 0.2000 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.0200 80,000.00 1,600.00
Mandor L.04 OH 0.0050 80,000.00 400.00
23,500.00
B Bahan
Kayu klas I Bengkirai) m3 0.0110 8,946,200.00 98,408.20
Paku Biasa 2" - 5" Kg 0.0500 12,800.00 640.00
99,048.20
C PERALATAN
D Jumlah A + B + C 122,548.20
E Overhead & Profit 12.5% 15,318.53
F Harga Satuan Pekerjaan (D+E) 137,866.73
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
22 A.4.6.1.23 Pemasangan 1 m2 Rangka Dinding Pemisah (60x120) cm Kayu klas II atau III
A Tenaga
Pekerja L.01 OH 0.1500 65,000.00 9,750.00
Tukang Kayu L.02 OH 0.4500 75,000.00 33,750.00
Kepala Tukang L.03 OH 0.0450 80,000.00 3,600.00
Mandor L.04 OH 0.0080 80,000.00 640.00
47,740.00
B Bahan
Kayu klas II (Kruing) m3 0.0280 6,582,500.00 184,310.00
Paku Biasa 2" - 5" Kg 0.1500 12,800.00 1,920.00
186,230.00
C PERALATAN
D Jumlah A + B + C 233,970.00
E Overhead & Profit 12.5% 29,246.25
F Harga Satuan Pekerjaan (D+E) 263,216.25
3 A.4.1.1.3 Membuat Beton mutu f'c=12,2 Mpa (K150), slum (12±2)cm, w/c = 0,72
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 299.000 1,410.00 421,590.00
Pasir Beton kg 799.000 275.00 219,725.00
Kerikil (maksimum 30 mm) kg 1017.000 159.93 162,644.67
Air ltr 215.000 20.00 4,300.00
808,259.67
C PERALATAN
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 945,014.67
E Overhead & Profit 12.5% 118,126.83
F Harga Satuan Pekerjaan (D+E) 1,063,141.50
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
4 A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
A Tenaga
Pekerja L.01 OH 1.200 65,000.00 78,000.00
Tukang Batu L.02 OH 0.200 75,000.00 15,000.00
Kepala Tukang L.03 OH 0.020 80,000.00 1,600.00
Mandor L.04 OH 0.060 80,000.00 4,800.00
99,400.00
B Bahan
Portland Semen Kg 230.000 1,410.00 324,300.00
Pasir Beton Kg 893.000 275.00 245,575.00
Kerikil (maksimum 30 mm) Kg 1027.000 159.93 164,243.93
Air ltr 200.000 20.00 4,000.00
738,118.93
C PERALATAN
D Jumlah A + B + C 837,518.93
E Overhead & Profit 12.5% 104,689.87
F Harga Satuan Pekerjaan (D+E) 942,208.79
5 A.4.1.1.5 Membuat Beton mutu f'c=14,5 MPa (K175), slum (12±2)cm, w/c = 0,66
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 326.000 1,410.00 459,660.00
Pasir Beton Kg 760.000 275.00 209,000.00
Kerikil (maksimum 30 mm) Kg 1029.000 159.93 164,563.78
Air ltr 215.000 20.00 4,300.00
837,523.78
C PERALATAN
D Jumlah A + B + C 974,278.78
E Overhead & Profit 12.5% 121,784.85
F Harga Satuan Pekerjaan (D+E) 1,096,063.63
6 A.4.1.1.6 Membuat Beton mutu f'c=16,9 MPa (K200), slum (12±2)cm, w/c = 0,61
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 352.000 1,410.00 496,320.00
Pasir Beton Kg 731.000 275.00 201,025.00
Kerikil (maksimum 30 mm) Kg 1031.000 159.93 164,883.63
Air ltr 215.000 20.00 4,300.00
866,528.63
C PERALATAN
D Jumlah A + B + C 1,003,283.63
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
E Overhead & Profit 12.5% 125,410.45
F Harga Satuan Pekerjaan (D+E) 1,128,694.08
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
7 A.4.1.1.7 Membuat Beton mutu f'c=19,3 MPa (K225), slum (12±2)cm, w/c = 0,58
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 371.000 1,410.00 523,110.00
Pasir Beton Kg 698.000 275.00 191,950.00
Kerikil (maksimum 30 mm) Kg 1047.000 159.93 167,442.44
Air ltr 215.000 20.00 4,300.00
886,802.44
C PERALATAN
D Jumlah A + B + C 1,023,557.44
E Overhead & Profit 12.5% 127,944.68
F Harga Satuan Pekerjaan (D+E) 1,151,502.13
8 A.4.1.1.8 Membuat Beton mutu f'c=21,7 MPa (K250), slum (12±2)cm, w/c = 0,56
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 384.000 1,410.00 541,440.00
Pasir Beton Kg 692.000 275.00 190,300.00
Kerikil (maksimum 30 mm) Kg 1039.000 159.93 166,163.04
Air ltr 215.000 20.00 4,300.00
902,203.04
C PERALATAN
D Jumlah A + B + C 1,038,958.04
E Overhead & Profit 12.5% 129,869.75
F Harga Satuan Pekerjaan (D+E) 1,168,827.79
9 A.4.1.1.9 Membuat Lantai Kerja Beton mutu f'c=24,0 MPa (K275), slum (12±2)cm, w/c = 0,53
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 406.000 1,410.00 572,460.00
Pasir Beton kg 684.000 275.00 188,100.00
Kerikil (maksimum 30 mm) kg 1026.000 159.93 164,084.00
Air ltr 215.000 20.00 4,300.00
928,944.00
C PERALATAN
D Jumlah A + B + C 1,065,699.00
E Overhead & Profit 12.5% 133,212.38
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
F Harga Satuan Pekerjaan (D+E) 1,198,911.38
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
10 A.4.1.1.10 Membuat Beton mutu f'c=26,4 MPa (K300), slum (12±2)cm, w/c = 0,52
A Tenaga
Pekerja L.01 OH 1.650 65,000.00 107,250.00
Tukang Batu L.02 OH 0.275 75,000.00 20,625.00
Kepala Tukang L.03 OH 0.028 80,000.00 2,240.00
Mandor L.04 OH 0.083 80,000.00 6,640.00
136,755.00
B Bahan
Portland Semen Kg 413.000 1,410.00 582,330.00
Pasir Beton Kg 681.000 275.00 187,275.00
Kerikil (maksimum 30 mm) Kg 1021.000 159.93 163,284.37
Air ltr 215.000 20.00 4,300.00
937,189.37
C PERALATAN
D Jumlah A + B + C 1,073,944.37
E Overhead & Profit 12.5% 134,243.05
F Harga Satuan Pekerjaan (D+E) 1,208,187.42
21 A.4.1.1.37 1 m² bekisting untuk permukaan beton biasa dengan kayu randu tebal 2 cm
A Tenaga
Pekerja L.01 OH 0.200 65,000.00 13,000.00
Tukang Kayu L.02 OH 0.500 75,000.00 37,500.00
Kepala Tukang L.03 OH 0.050 80,000.00 4,000.00
Mandor L.04 OH 0.010 80,000.00 800.00
55,300.00
B Bahan
kayu randu tebal 2 cm m3 0.022 945,300.00 20,796.60
Paku Biasa 2" - 5" Kg 0.400 12,800.00 5,120.00
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
25,916.60
C PERALATAN
D Jumlah A + B + C 81,216.60
E Overhead & Profit 12.5% 10,152.08
F Harga Satuan Pekerjaan (D+E) 91,368.68
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
C PERALATAN
D Jumlah A + B + C 124,655.00
E Overhead & Profit 12.5% 15,581.88
F Harga Satuan Pekerjaan (D+E) 140,236.88
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
13,260.00
B Bahan
Seng Gelombang 3" x 6" BJLS 28 Lbr 0.7000 40,700.00 28,490.00
Paku Pancing Kg 0.0200 7,500.00 150.00
28,640.00
C PERALATAN
D Jumlah A + B + C 41,900.00
E Overhead & Profit 12.5% 5,237.50
F Harga Satuan Pekerjaan (D+E) 47,137.50
HARGA
JUMLAH HARGA
SATUAN
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF
Rp Rp
A Tenaga
Pekerja L.01 OH 0.030 65,000.00 1,950.00
8,080.00
B Bahan
28,398.00
C PERALATAN
D Jumlah A + B + C 36,478.00
E Overhead & Profit 12.5% 4,559.75
A Tenaga
Pekerja L.01 OH 0.100 65,000.00 6,500.00
B Bahan
22,134.00
C PERALATAN
D Jumlah A + B + C 37,334.00
E Overhead & Profit 12.5% 4,666.75
253,253.00
C PERALATAN
D Jumlah A + B + C 374,853.00
11,050.00
B Bahan
Gypsum Board Lbr 0.364 64,300.00 23,405.20
C PERALATAN
D Jumlah A + B + C 35,885.20
A Tenaga
9,120.00
B Bahan
17,936.00
C PERALATAN
D Jumlah A + B + C 27,056.00
A Tenaga
9,120.00
B Bahan
16,100.00
C PERALATAN
D Jumlah A + B + C 25,220.00
E Overhead & Profit 12.5% 3,152.50
A Tenaga
Pekerja L.01 OH 1.2000 65,000.00 78,000.00
178,080.00
B Bahan
350,000.00
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
C PERALATAN
D Jumlah A + B + C 528,080.00
A Tenaga
66,880.00
B Bahan
434,000.00
C PERALATAN
D Jumlah A + B + C 500,880.00
A Tenaga
Pekerja L.01 OH 1.0000 65,000.00 65,000.00
152,000.00
B Bahan
364,000.00
C PERALATAN
D Jumlah A + B + C 516,000.00
A Tenaga
6,532.00
B Bahan
C PERALATAN
D Jumlah A + B + C 124,602.00
A Tenaga
12,916.00
B Bahan
954,860.00
C PERALATAN
D Jumlah A + B + C 967,776.00
13,020.00
B Bahan
842,655.00
C PERALATAN
D Jumlah A + B + C 855,675.00
A Tenaga
B Bahan
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
Seng Plaat Lbr 1.0500 20,300.00 21,315.00
107,007.00
C PERALATAN
D Jumlah A + B + C 136,687.00
10 A.4.2.1.19 Pemasangan Talang 1/2 Lingkaran Ø 15 cm, Seng Plaat BJLS 30 Lebar 45 cm
A Tenaga
35,290.00
B Bahan
31,543.00
C PERALATAN
D Jumlah A + B + C 66,833.00
A Tenaga
53,240.00
B Bahan
48,025.00
C PERALATAN
D Jumlah A + B + C 101,265.00
SNI A Tenaga
Pekerja L.01 OH 0.7000 65,000.00 45,500.00
Tukang Batu L.02 OH 0.3500 75,000.00 26,250.00
Kepala Tukang L.03 OH 0.0350 80,000.00 2,800.00
Mandor L.04 OH 0.0350 80,000.00 2,800.00
77,350.00
B Bahan
Ubin Keramik 40 x 40 cm Buah 6.6300 8,300.00 55,029.00
Portland Semen Kg 9.8000 1,410.00 13,818.00
Semen Warna Kg 1.3000 12,000.00 15,600.00
Pasir Pasang m3 0.0450 177,400.00 7,983.00
92,430.00
C PERALATAN
D Jumlah A + B + C 169,780.00
E Overhead & Profit 12.5% 21,222.50
F Harga Satuan Pekerjaan (D+E) 191,002.50
SNI A Tenaga
Pekerja L.01 OH 0.7000 65,000.00 45,500.00
Tukang Batu L.02 OH 0.3500 75,000.00 26,250.00
Kepala Tukang L.03 OH 0.0350 80,000.00 2,800.00
Mandor L.04 OH 0.0350 80,000.00 2,800.00
77,350.00
B Bahan
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 133,875.00
E Overhead & Profit 12.5% 16,734.38
F Harga Satuan Pekerjaan (D+E) 150,609.38
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
D Jumlah A + B + C 99,875.00
E Overhead & Profit 12.5% 12,484.38
F Harga Satuan Pekerjaan (D+E) 112,359.38
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
5 A.4.7.1.5 Pengecatan Bidang Kayu Baru (1 lp Plamuur, 1 lp Cat dasar, 3 Lp Cat Penutup)
A Tenaga
Pekerja L.01 OH 0.0700 65,000.00 4,550.00
Tukang Cat L.02 OH 0.1050 75,000.00 7,875.00
Kepala Tukang L.03 OH 0.0040 80,000.00 320.00
Mandor L.04 OH 0.0030 80,000.00 240.00
12,985.00
B Bahan
Cat Menie kg 0.2000 29,000.00 5,800.00
Plamuur kg 0.1500 32,800.00 4,920.00
Cat Dasar kg 0.1700 33,500.00 5,695.00
Cat Penutup kg 0.3500 51,700.00 18,095.00
Kuas bh 0.0100 13,200.00 132.00
Pengencer kg 0.0300 20,000.00 600.00
Amplas lbr 0.2000 6,400.00 1,280.00
36,522.00
C PERALATAN
D Jumlah A + B + C 49,507.00
E Overhead & Profit 12.5% 6,188.38
F Harga Satuan Pekerjaan (D+E) 55,695.38
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
10 A.4.7.1.10 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Decolite
A Tenaga
Pekerja L.01 OH 0.0200 65,000.00 1,300.00
Tukang Cat L.02 OH 0.0630 75,000.00 4,725.00
Kepala Tukang L.03 OH 0.0063 80,000.00 504.00
Mandor L.04 OH 0.0030 80,000.00 240.00
6,769.00
B Bahan
Plamir Kg 0.1000 17,500.00 1,750.00
Cat Dasar Kg 0.1000 19,000.00 1,900.00
Cat Penutup 2 kali Kg 0.2600 20,200.00 5,252.00
8,902.00
C PERALATAN
D Jumlah A + B + C 15,671.00
E Overhead & Profit 12.5% 1,958.88
F Harga Satuan Pekerjaan (D+E) 17,629.88
11 A.4.7.1.10.1 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex dalam ruangan
A Tenaga
Pekerja L.01 OH 0.0200 65,000.00 1,300.00
Tukang Cat L.02 OH 0.0630 75,000.00 4,725.00
Kepala Tukang L.03 OH 0.0063 80,000.00 504.00
Mandor L.04 OH 0.0030 80,000.00 240.00
6,769.00
B Bahan
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
Plamir Kg 0.1000 17,500.00 1,750.00
Cat Dasar Kg 0.1000 19,000.00 1,900.00
Cat Penutup 2 kali Kg 0.2600 54,500.00 14,170.00
17,820.00
C PERALATAN
D Jumlah A + B + C 24,589.00
E Overhead & Profit 12.5% 3,073.63
F Harga Satuan Pekerjaan (D+E) 27,662.63
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
12 A.4.7.1.10.2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) Mowilex luar ruangan
A Tenaga
Pekerja L.01 OH 0.0200 65,000.00 1,300.00
Tukang Cat L.02 OH 0.0630 75,000.00 4,725.00
Kepala Tukang L.03 OH 0.0063 80,000.00 504.00
Mandor L.04 OH 0.0030 80,000.00 240.00
6,769.00
B Bahan
Plamir Kg 0.1000 17,500.00 1,750.00
Cat Dasar Kg 0.1000 19,000.00 1,900.00
Cat Penutup 2 kali Kg 0.2600 83,600.00 21,736.00
25,386.00
C PERALATAN
D Jumlah A + B + C 32,155.00
E Overhead & Profit 12.5% 4,019.38
F Harga Satuan Pekerjaan (D+E) 36,174.38
14 A.4.7.1.11.1 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)Mowilex dalam ruangan
A Tenaga
Pekerja L.01 OH 0.0280 65,000.00 1,820.00
Tukang Cat L.02 OH 0.0420 75,000.00 3,150.00
Kepala Tukang L.03 OH 0.0042 80,000.00 336.00
Mandor L.04 OH 0.0030 80,000.00 240.00
5,546.00
B Bahan
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
Cat Dasar Kg 0.1200 19,000.00 2,280.00
Cat Penutup 2 kali Kg 0.1800 54,500.00 9,810.00
12,090.00
C PERALATAN
D Jumlah A + B + C 17,636.00
E Overhead & Profit 12.5% 2,204.50
F Harga Satuan Pekerjaan (D+E) 19,840.50
HARGA JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
15 A.4.7.1.11.2 Pengecatan Tembok Lama (1lap.Plamir, 2lap Cat Penutup)Mowilex luar ruangan
A Tenaga
Pekerja L.01 OH 0.0280 65,000.00 1,820.00
Tukang Cat L.02 OH 0.0420 75,000.00 3,150.00
Kepala Tukang L.03 OH 0.0042 80,000.00 336.00
Mandor L.04 OH 0.0030 80,000.00 240.00
5,546.00
B Bahan
Cat Dasar Kg 0.1200 19,000.00 2,280.00
Cat Penutup 2 kali Kg 0.1800 83,600.00 15,048.00
17,328.00
C PERALATAN
D Jumlah A + B + C 22,874.00
E Overhead & Profit 12.5% 2,859.25
F Harga Satuan Pekerjaan (D+E) 25,733.25
9 A.8.4.1.80 Biaya 1 m' pemasangan pipa PVC Ø 25 mm (galian 0,25m x 0,3m + Bahan)
Galian tanah keras m3 0.075 76,005.00 5,700.38
Urugan tanah kembali m3 0.065 13,687.50 889.69
Buangan sisa galian m3 0.010 25,031.25 250.31
Pemasangan Pipa 1.000 16,683.94 16,683.94
Harga Satuan Pekerjaan 23,524.31
10 A.8.4.1.81 Biaya 1 m' pemasangan pipa PVC Ø 40 mm (galian 0,25m x 0,4m + Bahan)
Galian tanah keras m3 0.100 76,005.00 7,600.50
Urugan tanah kembali m3 0.080 13,687.50 1,095.00
Buangan sisa galian m3 0.020 25,031.25 500.63
Pemasangan Pipa 1.000 29,382.95 29,382.95
Harga Satuan Pekerjaan 38,579.08
11 A.8.4.1.82 Biaya 1 m' pemasangan pipa PVC Ø 50 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 76,005.00 9,500.63
Urugan tanah kembali m3 0.095 13,687.50 1,300.31
Buangan sisa galian m3 0.030 25,031.25 750.94
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
Pemasangan Pipa 1.000 36,078.75 36,078.75
Harga Satuan Pekerjaan 47,630.63
12 A.8.4.1.83 Biaya 1 m' pemasangan pipa PVC Ø 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 76,005.00 11,400.75
Urugan tanah kembali m3 0.120 13,687.50 1,642.50
Buangan sisa galian m3 0.030 25,031.25 750.94
Pemasangan Pipa 1.000 67,275.00 67,275.00
Harga Satuan Pekerjaan 81,069.19
HARGA
JUMLAH HARGA
No. AHSP URAIAN PEKERJAAN KODE SAT. KOEF SATUAN
Rp Rp
13 A.8.4.1.84 Biaya 1 m' pemasangan pipa PVC Ø 100 mm (galian 0,30m x 1,00m + Bahan)
Galian tanah keras m3 0.300 76,005.00 22,801.50
Urugan tanah kembali m3 0.265 13,687.50 3,627.19
Buangan sisa galian m3 0.035 25,031.25 876.09
Pemasangan Pipa 1.000 94,438.13 94,438.13
Harga Satuan Pekerjaan 121,742.91
14 A.8.4.1.85 Biaya 1 m' pemasangan pipa HDPE OD 63 mm (galian 0,25m x 0,5m + Bahan)
Galian tanah keras m3 0.125 76,005.00 9,500.63
Urugan tanah kembali m3 0.095 13,687.50 1,300.31
Buangan sisa galian m3 0.030 25,031.25 750.94
Pemasangan Pipa 1.000 59,968.13 59,968.13
Harga Satuan Pekerjaan 71,520.00
15 A.8.4.1.86 Biaya 1 m' pemasangan pipa HDPE OD 75 mm (galian 0,25m x 0,6m + Bahan)
Galian tanah keras m3 0.150 76,005.00 11,400.75
Urugan tanah kembali m3 0.120 13,687.50 1,642.50
Buangan sisa galian m3 0.030 25,031.25 750.94
Pemasangan Pipa 1.000 82,665.56 82,665.56
Harga Satuan Pekerjaan 96,459.75
16 A.8.4.1.87 Biaya 1 m' pemasangan pipa HDPE OD 90 mm (galian 0,25m x 0,70m + Bahan)
Galian tanah keras m3 0.175 76,005.00 13,300.88
Urugan tanah kembali m3 0.140 13,687.50 1,916.25
Buangan sisa galian m3 0.035 25,031.25 876.09
Pemasangan Pipa 1.000 118,237.50 118,237.50
Harga Satuan Pekerjaan 134,330.72
I UPAH
1
Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2
Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3
Crew pengeboran Hari 4.00 x 1.00 50,000.00 200,000.00
4
Pengemudi Hari 2.00 x 2.00 40,000.00 160,000.00
II. PERALATAN
1 Sewa kendaraan Hari 2.00 x 2.00 250,000.00 1,000,000.00
angkut ( truk )
JUMLAH 1,485,000.00
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 70.00 x 1.00 5,900.00 413,000.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00 176,500.00
3 Veet Kg 2.00 x 1.00 33,100.00 66,200.00
4 Bentonite Kg 40.00 x 1.00 11,400.00 456,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 400,000.00 400,000.00
JUMLAH 2,036,700.00
1 HARI RATA-RATA 10 M' ----> JADI PER METER 203,670.00
An.3 Jenis pekerjaan :Pemboran pilot hole diameter 6", 50 -- 100 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00 442,500.00
2 Olie mesin Ltr 5.00 x 1.00 35,300.00 176,500.00
3 Veet Kg 2.00 x 1.00 33,100.00 66,200.00
4 Bentonite Kg 50.00 x 1.00 11,400.00 570,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
JUMLAH 2,155,200.00
1 HARI RATA-RATA 10 M' ----> JADI PER METER 215,520.00
An.4 Jenis pekerjaan :Pemboran pilot hole diameter 6", 100 -- 150 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 85.00 x 1.00 5,900.00 501,500.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00 211,800.00
3 Veet Kg 3.00 x 1.00 33,100.00 99,300.00
4 Bentonite Kg 60.00 x 1.00 11,400.00 684,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
JUMLAH 2,396,600.00
1 HARI RATA-RATA 10 M' ----> JADI PER METER 239,660.00
An.5 Jenis pekerjaan : Pekerjaan reaming, 0 -- 65 m
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 60.00 x 1.00 5,900.00 354,000.00
2 Olie mesin Ltr 4.00 x 1.00 35,300.00 141,200.00
3 Veet Kg 2.00 x 1.00 33,100.00 66,200.00
4 Bentonite Kg 40.00 x 1.00 11,400.00 456,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
JUMLAH 1,917,400.00
1 HARI RATA-RATA 10 M' ----> JADI PER METER 191,740.00
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3 Keuangan Hari 1.00 x 1.00 50,000.00 50,000.00
4 Logistik Hari 1.00 x 1.00 50,000.00 50,000.00
5 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
6 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
7 Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
8 Buruh lokal Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 75.00 x 1.00 5,900.00 442,500.00
2 Olie mesin Ltr 6.00 x 1.00 35,300.00 211,800.00
3 Veet Kg 3.00 x 1.00 33,100.00 99,300.00
4 Bentonite Kg 55.00 x 1.00 11,400.00 627,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
JUMLAH 2,280,600.00
1 HARI RATA-RATA 10 M' ----> JADI PER METER 228,060.00
An.7 Jenis pekerjaan : Electric logging
I UPAH
1
Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2
Geologist Hari 1.00 x 1.00 60,000.00 60,000.00
3
Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
4
Crew pengeboran Hari 2.00 x 1.00 50,000.00 100,000.00
II. PERALATAN
1 Recorder paper Unit 1.00 x 1.00 20,000.00 20,000.00
2 Alat tulis Unit 1.00 x 1.00 15,000.00 15,000.00
III. PERALATAN
Mesin peralatan logging Unit 1.00 x 1.00 700,000.00 700,000.00
Tranportasi peralatan logging Unit 1.00 x 1.00 150,000.00 150,000.00
JUMLAH 1,170,000.00
1 HARI RATA-RATA 50 M' ----> JADI PER METER 23,400.00
An.8 Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diametr 8"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00 708,000.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00 105,900.00
3 Veet Kg 2.00 x 1.00 33,100.00 66,200.00
4 Kawat las Btg 120.00 x 1.00 900.00 108,000.00
Pipa jambang diameter 8" Mtr 60.00 x 578,400.00 34,704,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 36,532,100.00
1 HARI RATA-RATA 60 M' ----> JADI PER METER 608,868.33
DIBULATKAN 608,000.00
An.9 Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 6"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00 236,000.00
2 Olie mesin Ltr 1.00 x 35,300.00 35,300.00
3 Veet Kg 0.60 x 33,100.00 19,860.00
4 Kawat las Btg 60.00 x 900.00 54,000.00
5 Pipa buta diameter 6" Mtr 30.00 x 310,000.00 9,300,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 10,485,160.00
1 HARI RATA-RATA 30 M' ----> JADI PER METER 349,505.33
DIBULATKAN 349,000.00
An.10 Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel diametr 6"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00 236,000.00
2 Olie mesin Ltr 1.00 x 35,300.00 35,300.00
3 Veet Kg 0.60 x 33,100.00 19,860.00
4 Kawat las Btg 60.00 x 900.00 54,000.00
5 Screen stainless steel dia 6 : Mtr 30.00 x 1,719,900.00 51,597,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 52,782,160.00
1 HARI RATA-RATA 30 M' ----> JADI PER METER 1,759,405.33
DIBULATKAN 1,759,000.00
An.8' Jenis pekerjaan : Pengadaan dan pemasangan pipa jambang diametr 6" (GIP)
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 120.00 x 1.00 5,900.00 708,000.00
2 Olie mesin Ltr 3.00 x 1.00 35,300.00 105,900.00
3 Veet Kg 2.00 x 1.00 33,100.00 66,200.00
4 Kawat las Btg 120.00 x 1.00 900.00 108,000.00
5 Pipa jambang diameter 6" Mtr 60.00 x 323,200.00 19,392,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 21,220,100.00
1 HARI RATA-RATA 60 M' ----> JADI PER METER 353,668.33
DIBULATKAN 353,000.00
An.9' Jenis pekerjaan : Pengadaan dan pemasangan pipa buta diametr 4" (GIP)
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00 236,000.00
2 Olie mesin Ltr 1.00 x 35,300.00 35,300.00
3 Veet Kg 0.60 x 33,100.00 19,860.00
4 Kawat las Btg 60.00 x 900.00 54,000.00
5 Pipa buta diameter 4" Mtr 30.00 x 283,500.00 8,505,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 9,690,160.00
1 HARI RATA-RATA 30 M' ----> JADI PER METER 323,005.33
DIBULATKAN 323,000.00
An.10' Jenis pekerjaan : Pengad. dan pemasangan screen stainless steel diametr 4"
I UPAH
1 Site manager Hari 1.00 x 1.00 75,000.00 75,000.00
2 Operator pemboran Hari 1.00 x 1.00 50,000.00 50,000.00
3 Mekanik Hari 1.00 x 1.00 60,000.00 60,000.00
4 Crew pengeboran Hari 3.00 x 1.00 50,000.00 150,000.00
5 Penjaga malam Hari 2.00 x 1.00 40,000.00 80,000.00
II. PERALATAN
1 Solar Ltr 40.00 x 5,900.00 236,000.00
2 Olie mesin Ltr 1.00 x 35,300.00 35,300.00
3 Veet Kg 0.60 x 33,100.00 19,860.00
4 Kawat las Btg 60.00 x 900.00 54,000.00
5 Screen stainless steel dia 4" : Mtr 30.00 x 1,181,300.00 35,439,000.00
III. PERALATAN
Peralatan pemboran Unit 1.00 x 1.00 375,000.00 375,000.00
Sewa mesin las Unit 1.00 x 1.00 50,000.00 50,000.00
JUMLAH 36,624,160.00
1 HARI RATA-RATA 30 M' ----> JADI PER METER 1,220,805.33
DIBULATKAN 1,220,000.00
Analisa EI-421
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.008544642857143 240571.451167315 2,055.60
5. Asphalt Finisher E02 Jam 0.038634576787187 216912.260439046 8,380.31
6. Tandem Roller E17 Jam 0.031727445526287 201556.451167315 6,394.87
7 P. Tyre Roller E18 Jam 0.010871558528578 241655.201167315 2,627.17
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.011392857142857 240571.451167315 2,740.80
5. Asphalt Finisher E02 Jam 0.028975932590391 216912.260439046 6,285.24
6. Tandem Roller E17 Jam 0.023795584144716 201556.451167315 4,796.15
7 P. Tyre Roller E18 Jam 0.008158586606456 241655.201167315 1,971.56
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.258928571428571 240571.451167315 62,290.82
5. Asphalt Finisher E02 Jam 0.019057414558702 216912.260439046 4,133.79
6. Tandem Roller E17 Jam 0.015650309452429 201556.451167315 3,154.42
7 P. Tyre Roller E18 Jam 0.004308434631094 241655.201167315 1,041.16
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 6.3.(4a) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Lataston Lapis Pondasi (HRS-Base) (gradasi TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : Ton
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.258928571428571 240571.451167315 62,290.82
5. Asphalt Finisher E02 Jam 0.00408373169115 216912.260439046 885.81
6. Tandem Roller E17 Jam 0.015751536523009 201556.451167315 3,174.82
7 P. Tyre Roller E18 Jam 0.004923925292679 241655.201167315 1,189.89
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.258928571428571 240571.451167315 62,290.82
5. Asp. Finisher E02 Jam 0.013738588728202 216912.260439046 2,980.07
6. Tandem Roller E17 Jam 0.013523923279324 201556.451167315 2,725.83
7 P. Tyre Roller E18 Jam 0.005802443060626 241655.201167315 1,402.19
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.258928571428571 240571.451167315 62,290.82
5. Asphalt Finisher E02 Jam 0.010990870982562 216912.260439046 2,384.05
6. Tandem Roller E17 Jam 0.010819138623459 201556.451167315 2,180.67
7 P. Tyre Roller E18 Jam 0.004641954448501 241655.201167315 1,121.75
8 Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.00957138052807 367476.74838601 3,517.26
2. AMP E01 Jam 0.020080321285141 6705026.59882663 134,639.09
3. Genset E12 Jam 0.020080321285141 413971.451167315 8,312.68
4. Dump Truck E08 Jam 0.258928571428571 240571.451167315 62,290.82
5. Asphalt Finisher E02 Jam 0.009159059152135 216912.260439046 1,986.71
6. Tandem Roller E17 Jam 0.009015948852883 201556.451167315 1,817.22
7 P. Tyre Roller E18 Jam 0.005157727165001 241655.201167315 1,246.39
8 Alat Bantu Ls 1 0 -
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
MATA PEMBAYARAN NO. : 8.1 (1) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Pondasi Agregat Kls. A Untuk - Pek. Minor TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
MATA PEMBAYARAN NO. : 8.1 (2) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Pondasi Agregat Kls. B Untuk - Pek. Minor TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (3) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : TOTAL HARGA (Rp.) : -
Agregat Utk. Lapis Pond. Jalan - Tanpa Penutup As
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.1 (5) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Camp. Aspal Panas Utk.Pek.Minor TOTAL HARGA (Rp.) : -
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader E15 Jam 0.0301441058351051 367476.74838601 11,077.26
2. AMP E01 Jam 0.055421686746988 6705026.59882663 371,603.88
3. Genset E12 Jam 0.055421686746988 413971.451167315 22,943.00
4. Dump Truck E09 Jam 0.332530120481928 435646.451167315 144,865.57
5. Pedestrian Roller E24 Jam 0.197511356903022 42895.4573915947 8,472.34
6. Alat Bantu Ls 1 0 -
KEGIATAN :
PEKERJAAN :
LOKASI :
ITEM PEMBAYARAN NO. : 8.1 (7) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Penetrasi Macadam Utk.Pek.Minor TOTAL HARGA : -
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.2 (1) PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : Galian untuk Bahu Jalan & Pek. Minor Lain TOTAL HARGA (Rp.) : 56,781.88
SATUAN PEMBAYARAN : M3
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
A. TENAGA
B. BAHAN
C. PERALATAN
1. Wheel Loader (E15) jam 0.0084952196788713 367476.74838601 3,121.80
2. Dump Truck (E08) jam 0.292647346243779 240571.451167315 70,402.60
3. Motor Grader (E13) jam 0.0042594620907874 316433.951167315 1,347.84
4. Tandem Roller (E17) jam 0.0053547523427042 201556.451167315 1,079.28
5. Water Tanker (E23) jam 0.0140562248995984 240571.451167315 3,381.53
6. Alat Bantu Ls 1 0 -
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.4.(2).a PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : TOTAL HARGA (Rp.) : 21,159.81
Marka Jalan Bukan Termoplastic (Cat trotoar
SATUAN PEMBAYARAN : M2
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN : 0
PEKERJAAN : 0
LOKASI : 0
ITEM PEMBAYARAN NO. : 8.4.(2).b PERKIRAAN VOL. PEK. : -
JENIS PEKERJAAN : TOTAL HARGA (Rp.) : 19,054.00
Marka Jalan Bukan Termoplastic ( Cat tembok
SATUAN PEMBAYARAN : M2
A. TENAGA
B. BAHAN
C. PERALATAN
KEGIATAN :
PEKERJAAN :
LOKASI :
A. TENAGA
B. BAHAN
C. PERALATAN
1. Dump Truck E08 Jam 0.0041 240,571.45 992.36
2. Tandem Roller E17 Jam 0.0351 201,556.45 7,076.99
3. Alat Bantu Ls 1.0000 8,459.44 8,459.44
4.
5.
6.
7
8