DAFTAR HARGA SATUAN SEWA ALAT TAHUN 2016

KOTA SURABAYA

No Namadan Spesifikasi Satuan Harga(Rp)


1 2 3 4

SEWA ALAT
1 Sewa Compresor Jam Rp 33,250.00
2 Sewa Concreate Mixer m3 (min 3jam) Jam Rp 61,750.00
3 Sewa Concreate Pump (min 3 jam ) Jam Rp 61,750.00
4 Sewa Concreate vibrator Jam Rp 14,250.00
5 Sewa Crane 30ton-min8jam (termasuk mob/demob.Opertor, BBM) Jam Rp 130,625.00
Sewa Hammer tiang pancang-min8jam Hidrolis (termasuk
6 mob/demob,operator, BBM) Jam Rp 175,750.00
7 Sewa Bucket dan crane/draglin scraper Jam Rp 76,000.00
8 Sewa Motor Grader125-140Pk (min5jam) Jam Rp 261,250.00
9 Sewa PhenumaticTire Roller (min5jam) Jam Rp 209,000.00
10 SewaTruck Tangki Air (min 5 jam) Jam Rp 470,250.00
11 Sewa Truk Kelas 3 Dalam kota Jam Rp 727,500.00
12 Sewa Vibrator Roller (min 5 jam) Jam Rp 128,250.00
13 Sewa Excavator 6m Jam Rp 123,500.00
14 SewaTheodolit set Rp 329,175.00
15 Sewa Welding Set (min 5 jam) hari Rp 28,500.00
16 Sewa Alat Bantu (1 set@3alat ) jam Rp 950.00
17 Sewa Dump truck 6T min(5jam) jam Rp 71,100.00
18 Sewa Dump truck 5T min(5jam) jam Rp 66,100.00
19 Sewa Dump truck 3,5T min(5jam) jam Rp 61,750.00
20 Sewa alat bantu strouss pile jam Rp 10,200.00
21 Sewa Mesin Borepile Dia.40 cm jam Rp 115,000.00
22 Sewa Stamper jam Rp 150,000.00
DAFTAR HARGA SATUAN UPAH DAN BAHAN TAHUN 2016
KOTA SURABAYA

No Namadan Spesifikasi Satuan Harga(Rp)


1 2 3 4

I. UPAH
1.1 Biaya jasa konstruksi
1 Mandor O.H Rp 117,000.00
2 Kepala Tukang O.H Rp 115,000.00
3 Surveyor Geodesi O.H Rp 117,000.00

1.2 Tukang
1 Tukang batu O.H Rp 112,500.00
2 Tukang besi O.H Rp 112,500.00
3 Tukang Las O.H Rp 112,500.00
4 Tukang Listrik O.H Rp 112,500.00
5 Tukang cat O.H Rp 112,500.00
6 Tukang gali lumpur O.H Rp 112,500.00
7 Tukang gali tanah O.H Rp 112,500.00
8 Tukang kayu O.H Rp 112,500.00
9 Tukang pipa O.H Rp 112,500.00
10 Tukang plitur O.H Rp 112,500.00

1.3 Pembantu Tukang


1 Pembantu Tukang O.H Rp 110,000.00
2 Pembantu Tukang O.H Rp 110,000.00
3 Pembantu mekanik O.H Rp 110,000.00
4 Pembantu operator O.H Rp 110,000.00
5 Pembantu tukang batu O.H Rp 110,000.00
6 Pembantu tukang besi O.H Rp 110,000.00
7 Pembantu tukang cat O.H Rp 110,000.00
8 Pembantu tukang kayu O.H Rp 110,000.00
9 Pembantu tukang listrik O.H Rp 110,000.00
10 Pembantu tukang pipa O.H Rp 110,000.00

II. BAHAN
1 Tasirtu / Sirtu m3 Rp 115,000.00
2 Pasir Urug m3 Rp 125,000.00
3 Semen Portland 50 Kg zak Rp 71,000.00
4 Semen Portland 40 Kg zak Rp 58,000.00
5 Pasir Beton m3 Rp 187,500.00
6 Batu Pecah Mesin 1/2 m3 Rp 250,000.00
7 Air (biaya air tawar) ltr Rp 30.00
8 Batu kali belah 15/20 cm m3 Rp 140,200.00
9 Semen Portland kg Rp 1,500.00
10 Pasir pasang m3 Rp 150,000.00
11 Batu bata merah Uk. 22x11x4.5 cm bh Rp 730.00
12 Beton Readymix K225 (fc' 18,68) m3 Rp 960,000.00
13 Beton Readymix K250 (fc' 20,75) m3 Rp 990,000.00
14 Beton Readymix K300 (fc' 24,90) m3 Rp 1,032,000.00
15 Besi Beton (polos/ulir) Kg Rp 8,500.00
16 Paku Usuk Kg Rp 19,000.00
18 Kayu Meranti Papan Bekisting m3 Rp 3,200,000.00
19 Minyak Bekisting ltr Rp 28,300.00
20 Kayu Kamper Balok 4/6, 5/7 m3 Rp 6,400,000.00
21 Kayu Meranti Balok m3 Rp 4,500,000.00
22 Multiplex Lapis film 1 sisi; t:12 mm 120x240 lbr Rp 125,000.00
23 Keramik Lantai 40x40 (Polished) m2 Rp 75,000.00
24 Keramik Lantai40x40 (Unpolished) m2 Rp 70,000.00
25 Keramik Lantai 30x30 (Unpolished) m2 Rp 66,500.00
26 Keramik Dinding 30x30 (Unpolished) m2 Rp 67,500.00
27 Keramik Dinding 20x40 (Unpolished) m2 Rp 65,500.00
28 Semen Bewarna Yiyitan kg Rp 11,200.00
29 Cat Alkali Resisting Primer ltr Rp 32,750.00
30 Cat Dinding Weatherbond Kg Rp 62,500.00
31 Kertas Gosok no 150 lbr Rp 8,750.00
32 Dempul Tembok (Cat Dasar) Kg Rp 35,000.00
33 Cat Tembok Interior Kg Rp 43,000.00
34 Daun Pintu Solidwood urat kayu fin. Polyurethane uk. 90x210 cm bh Rp 1,350,000.00
35 Daun Pintu Solidwood urat kayu fin. Polyurethane uk. 80x210 cm bh Rp 1,250,000.00
36 Daun Pintu Solidwood urat kayu fin. Polyurethane uk. 70x210 cm bh Rp 1,200,000.00
37 Daun Pintu Solidwood urat kayu fin. Polyurethane uk. 60x170 cm bh Rp 1,090,000.00
38 Handle Stainless set Rp 340,000.00
39 Engsel Stainless Pintu stel Rp 36,800.00
40 Silicone ls Rp 15,000.00
41 Pasang Hak Angin Biasa stel Rp 41,200.00
42 Pasang Kunci Selot Alumunium bh Rp 11,700.00
43 Frame Vision Jendela Alumunium m' Rp 139,250.00
44 Kaca 5 mm Rayben m2 Rp 113,850.00
45 Kaca 5 mm Polos m2 Rp 113,850.00
46 Engsel Stainless Jendela stel Rp 25,900.00
47 Kusen Alumunium 4x10 cm, Profil 4 Inchi m' Rp 95,000.00
48 Sekrup / ripet bh Rp 210.00
49 Sealant tube Rp 26,800.00
50 Saklar Tunggal bh Rp 29,300.00
51 Saklar Ganda bh Rp 45,400.00
52 Stop Kontak 200 W bh Rp 18,000.00
53 Kabel NYY 500 Volt 3 x 2,5 mm2 m' Rp 10,700.00
54 Pipa Paralon 5 / 8 lonjor Rp 20,000.00
55 Tee Dos PVC bh Rp 4,500.00
56 Box MCB 8 Port bh Rp 150,000.00
57 MCB 6A 10P / 8 KA bh Rp 81,400.00
58 Kabel NYM 3 x 2,5 mm m' Rp 10,050.00
59 Isolator unit Rp 5,000.00
60 Fiting Plafon bh Rp 42,500.00
61 Kabel NYY 4x4 m' Rp 20,200.00
62 Lampu LED 5 W bh Rp 70,000.00
63 Lampu LED 7 W bh Rp 85,000.00
64 Gypsum Kalsiboard Tbl. 4,5 mm 120x240 lembar Rp 106,750.00
65 Metal Furing 40/40 m' Rp 10,000.00
66 Metal Furing 20/40 m' Rp 8,750.00
67 Kawat Penggantung m' Rp 7,500.00
68 Ramzet bh Rp 2,000.00
69 Paku Asbes Sekrup 4 kg Rp 7,500.00
70 Paku Asbes Sekrup 4 bh Rp 150.00
71 List Plafond Gypsum Uk. 5/5 m' Rp 10,000.00
72 Semen Warna Plafond kg Rp 16,000.00
73 Pipa PVC 4" jenis AW Panjang 6 m m' Rp 455,880.00
74 Pipa PVC 3" jenis AW Panjang 6 m m' Rp 312,780.00
75 Pipa PVC 2" jenis AW Panjang 6 m m' Rp 170,820.00
76 Ijuk bh Rp 27,500.00
77 Kawat Ikat kg Rp 14,900.00
78 Paku Biasa 2-5 inchi Doz Rp 27,000.00
79 Kayu Meranti Papan 2/20, 4/10 m3 Rp 3,200,000.00
80 Kayu Meranti Usuk 4/6, 5/7 m3 Rp 4,500,000.00
81 Tandon Air Roof Tank Stainlees steal ex.profil tank buah Rp 4,500,000.00
82 Pompa air Tranfer Ex. Grundfos Buah Rp 3,000,000.00
83 Booster pump package Ex.Grundfos JDBasic-3 Buah Rp 3,200,000.00
84 Electrode baja Kg Rp 55,000.00
85 Besi Profile (Baja Konstruksi) kg Rp 10,000.00
86 Baut buah Rp 13,200.00
87 Anchor Bolt buah Rp 102,000.00
88 Rooster buah Rp 10,000.00
89 Genteng Karangpilang buah Rp 20,000.00
HARGA
URAIAN KEGIATAN Koef. SATUAN HARGA
SATUAN
UITZET Dengan Waterpass / Theodolit m2
Upah:
Surveyor Geodesi 0.0067 O.H 117,000.00 783.90
Pembantu Tukang 0.0133 O.H 110,000.00 1,463.00
Jumlah: 2,246.90
Sewa:
SewaTheodolit 0.0067 Hari 329,175.00 2,205.47
Jumlah: 2,205.47
Nilai HSPK : 4,452.37

Pembersihan Lokasi Ringan dan perataan m2

Upah:
Mandor 0.0250 O.H 117,000.00 2,925.00
Pembantu Tukang 0.0500 O.H 110,000.00 5,500.00
Jumlah: 8,425.00
Nilai HSPK : 8,425.00
Buangan Material dan Galian Tanah m3
Upah:
Mandor 0.0400 O.H 117,000.00 4,680.00
Pembantu Tukang 0.2000 O.H 110,000.00 22,000.00
Jumlah: 26,680.00
Nilai HSPK : 26,680.00
Galian Tanah Cadas / Rabat m3
Upah:
Mandor 0.0600 O.H 117,000.00 7,020.00
Pembantu Tukang 1.5000 O.H 110,000.00 165,000.00
Jumlah: 172,020.00
Nilai HSPK : 172,020.00
Galian Tanah untuk Konstruksi > 1 m m3
Upah:
Mandor 0.0320 O.H 117,000.00 3,744.00
Pembantu Tukang 1.0000 O.H 110,000.00 110,000.00
Jumlah: 113,744.00
Nilai HSPK : 113,744.00
Urugan Sirtu (Padat) m3
Upah:
Mandor 0.0250 O.H 117,000.00 2,925.00
Pembantu Tukang 0.2500 O.H 110,000.00 27,500.00
Jumlah: 30,425.00
Bahan:
Tasirtu / Sirtu 1.2000 m3 115,000.00 138,000.00
Jumlah: 138,000.00
Sewa:
Sewa Stamper 0.0088 Hari 150,000.00 1,320.00
Jumlah: 1,320.00
Nilai HSPK : 169,745.00
Urugan Pasir (Padat) m3
Upah:
Mandor 0.0100 O.H 117,000.00 1,170.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 34,170.00
Bahan:
Pasir Urug 1.2000 m3 125,000.00 150,000.00
Jumlah: 150,000.00
Nilai HSPK : 184,170.00
Lantai Kerja K-175 m3
Upah:
Mandor 0.0830 O.H 117,000.00 9,711.00
Kepala Tukang 0.0280 O.H 115,000.00 3,220.00
Tukang batu 0.2750 O.H 112,500.00 30,937.50
Pembantu Tukang 1.6500 O.H 110,000.00 181,500.00
Jumlah: 225,368.50
Bahan:
Semen Portland 40 Kg 8.1500 zak 58,000.00 472,700.00
Pasir Beton 0.4806 m3 187,500.00 90,117.19
Batu Pecah Mesin 1/2 0.5416 m3 250,000.00 135,394.74
Air (biaya air tawar) 215.0000 liter 30.00 6,450.00
Jumlah: 704,661.92
Nilai HSPK : 930,030.42
Urugan Tanah Kembali m3
Upah:
Mandor 0.0190 O.H 117,000.00 2,223.00
Pembantu Tukang 0.1020 O.H 110,000.00 11,220.00
Jumlah: 13,443.00
Nilai HSPK : 13,443.00
Pembuatan Lubang Strouss Pile diameter
titik
40 cm kedalaman 3m
Upah:
Mandor 0.0960 O.H 117,000.00 11,232.00
Pembantu Tukang 1.9200 O.H 110,000.00 211,200.00
Jumlah: 222,432.00
Sewa:
Sewa Mesin Borepile Dia.40 cm 1.6000 jam 115,000.00 184,000.00
Jumlah: 184,000.00
Nilai HSPK : 406,432.00
Nilai HSPK / m' : 135,477.33
Pondasi Batu Kali Belah 15/20 1:5 m3
Upah:
Mandor 0.0750 O.H 117,000.00 8,775.00
Kepala Tukang 0.0750 O.H 115,000.00 8,625.00
Tukang batu 0.7500 O.H 112,500.00 84,375.00
Pembantu Tukang 1.5000 O.H 110,000.00 165,000.00
Jumlah: 266,775.00
Bahan:
Batu kali belah 15/20 cm 1.2000 m3 470,800.00 564,960.00
Semen Portland 50 Kg 2.7200 Zak 71,000.00 193,120.00
Pasir pasang 0.5440 m3 150,000.00 81,600.00
Jumlah: 839,680.00
Nilai HSPK : 1,106,455.00
1 m2 Pondasi Rollag Batu Bata 1:3 m2
Upah:
Mandor 0.0200 O.H 117,000.00 2,340.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 47,740.00
Bahan:
Batu bata merah Uk. 22x11x4.5 cm 70.0000 bh 730.00 51,100.00
Semen Portland 40 Kg 0.2900 zak 58,000.00 16,820.00
Pasir pasang 0.0400 m3 150,000.00 6,000.00
Jumlah: 73,920.00
Nilai HSPK : 121,660.00
1 m3 Pondasi Rollag Batu Bata 1:3 m3
Pekerjaan:
1 m2 Pondasi Rollag Batu Bata 1:3 8.3333 m2 121,660.00 1,013,833.33
Jumlah: 1,013,833.33
Nilai HSPK : 1,013,833.33
Pekerjaan Beton K-225 (f'c 18,675) m3
Upah:
Mandor 0.0830 O.H 117,000.00 9,711.00
Kepala Tukang 0.0280 O.H 115,000.00 3,220.00
Tukang batu 0.2750 O.H 112,500.00 30,937.50
Pembantu Tukang 1.6500 O.H 110,000.00 181,500.00
Jumlah: 225,368.50
Bahan:
Semen Portland 40 Kg 9.2750 zak 58,000.00 537,950.00
Pasir Beton 0.4363 m3 187,500.00 81,796.88
Batu Pecah Mesin 1/2 0.5511 m3 250,000.00 137,763.16
Air (biaya air tawar) 215.0000 kg 30.00 6,450.00
Jumlah: 763,960.03
Nilai HSPK : 989,328.53
Pekerjaan Beton K-250 (f'c 20,75) m3
Upah:
Mandor 0.0830 O.H 117,000.00 9,711.00
Kepala Tukang 0.0280 O.H 115,000.00 3,220.00
Tukang batu 0.2750 O.H 112,500.00 30,937.50
Pembantu Tukang 1.6500 O.H 110,000.00 181,500.00
Jumlah: 225,368.50
Bahan:
Semen Portland 40 Kg 9.6000 zak 58,000.00 556,800.00
Pasir Beton 0.4325 m3 187,500.00 81,093.75
Batu Pecah Mesin 1/2 0.5468 m3 250,000.00 136,710.53
Air (biaya air tawar) 215.0000 kg 30.00 6,450.00
Jumlah: 781,054.28
Nilai HSPK : 1,006,422.78
Pekerjaan Pembesian dengan besi beton
kg
(polos/ulir)
Upah:
Mandor 0.0004 O.H 117,000.00 46.80
Kepala Tukang 0.0007 O.H 115,000.00 80.50
Tukang batu 0.0070 O.H 112,500.00 787.50
Pembantu Tukang 0.0070 O.H 110,000.00 770.00
Jumlah: 1,684.80
Bahan:
Besi Beton (polos/ulir) 1.1000 kg 8,500.00 9,350.00
Kawat Ikat 0.0150 kg 14,900.00 223.50
Jumlah: 9,573.50
Nilai HSPK : 11,258.30

Pembuatan Beton Strouss Pile Dia.40 cm m3

Upah:
Mandor 0.0800 O.H 117,000.00 9,360.00
Kepala Tukang 0.0800 O.H 115,000.00 9,200.00
Tukang batu 0.4500 O.H 112,500.00 50,625.00
Pembantu Tukang 1.6500 O.H 110,000.00 181,500.00
Jumlah: 250,685.00
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Pekerjaan Pembesian dengan besi beton
114.5244 kg 11,258.30 1,289,350.10
(polos/ulir)
Jumlah: 2,295,772.87
Nilai HSPK : 2,546,457.87
Bekisting Untuk Pile Cap m2
Upah:
Mandor 0.0260 O.H 117,000.00 3,042.00
Kepala Tukang 0.0260 O.H 115,000.00 2,990.00
Tukang batu 0.2600 O.H 112,500.00 29,250.00
Pembantu Tukang 0.5200 O.H 110,000.00 57,200.00
Jumlah: 92,482.00
Bahan:
Kayu Meranti Papan Bekisting 0.0450 m3 3,200,000.00 144,000.00
Paku Usuk 0.3000 kg 19,000.00 5,700.00
Minyak Bekisting 0.1000 ltr 28,300.00 2,830.00
Jumlah: 152,530.00
Nilai HSPK : 245,012.00
Bekisting Untuk Pile Cap (Bahan 2x
m2
pakai)
Bahan:
Bekisting Pile Cap (Bahan 2x pakai) 0.5000 m2 245,012.00 122,506.00
Jumlah: 122,506.00
Nilai HSPK : 122,506.00
Pembongkaran Cetakan Bekisting Beton m2

Upah:
Mandor 0.0250 O.H 117,000.00 2,925.00
Pembantu Tukang 0.0500 O.H 110,000.00 5,500.00
Jumlah: 8,425.00
Nilai HSPK : 8,425.00
Beton Pile Cap P1 2400x2400x40 fc'
m3
20,75 Mpa; K-250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 1.6600 m2 122,506.00 203,359.96
Pekerjaan Pembesian dengan besi beton
112.1354 kg 11,258.30 1,262,454.47
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 1.6600 m2 8,425.00 13,985.50
Jumlah: 2,486,222.71
Nilai HSPK : 2,486,222.71
Beton Pile Cap P2 2400x1200x40 fc'
m3
20,75 Mpa; K-250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 2.5000 m2 122,506.00 306,265.00
Pekerjaan Pembesian dengan besi beton
125.1004 kg 11,258.30 1,408,417.77
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 2.5000 m2 8,425.00 21,062.50
Jumlah: 2,742,168.05
Nilai HSPK : 2,742,168.05
Beton Pile Cap P3 2400x2400x40 fc'
m3
20,75 Mpa; K-250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 1.4900 m2 122,506.00 182,533.94
Pekerjaan Pembesian dengan besi beton
113.1677 kg 11,258.30 1,274,076.38
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 1.4900 m2 8,425.00 12,553.25
Jumlah: 2,475,586.35
Nilai HSPK : 2,475,586.35
Beton Pile Cap P4 3200x3200x40 fc'
m3
20,75 Mpa; K-250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) #NAME? m2 122,506.00 #NAME?
Pekerjaan Pembesian dengan besi beton
127.8156 kg 11,258.30 1,438,986.84
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton #NAME? m2 8,425.00 #NAME?
Jumlah: #NAME?
Nilai HSPK : #NAME?
Beton Pile Cap PT 600x1360x30 fc' 20,75
m3
Mpa; K-250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 3.3300 m2 122,506.00 407,944.98
Pekerjaan Pembesian dengan besi beton
149.7568 kg 11,258.30 1,686,006.44
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 3.3300 m2 8,425.00 28,055.25
Jumlah: 3,128,429.45
Nilai HSPK : 3,128,429.45
Bekisting Untuk Sloof m2
Upah:
Mandor 0.0260 O.H 117,000.00 3,042.00
Kepala Tukang 0.0260 O.H 115,000.00 2,990.00
Tukang kayu 0.2600 O.H 112,500.00 29,250.00
Pembantu Tukang 0.5200 O.H 110,000.00 57,200.00
Jumlah: 92,482.00
Bahan:
Kayu Meranti Papan Bekisting 0.0450 m3 3,200,000.00 144,000.00
Paku Usuk 0.3000 kg 19,000.00 5,700.00
Minyak Bekisting 0.1000 ltr 28,300.00 2,830.00
Jumlah: 152,530.00
Nilai HSPK : 245,012.00
Bekisting Untuk Sloof,Kolom Praktis
m2
(Bahan 2x pakai)
Bahan:
Bekisting Sloof (Bahan 2x pakai) 0.5000 m2 245,012.00 122,506.00
Jumlah: 122,506.00
Nilai HSPK : 122,506.00
Beton Sloof S1 25x50 fc' 20,75 Mpa; K-
m3
250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 8.0000 m2 122,506.00 980,048.00
Pekerjaan Pembesian dengan besi beton
164.2949 kg 11,258.30 1,849,681.59
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 8.0000 m2 8,425.00 67,400.00
Jumlah: 3,903,552.37
Nilai HSPK : 3,903,552.37
Beton Sloof S2 20x35 fc' 20,75 Mpa; K-
m3
250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 7.8500 m2 122,506.00 961,672.10
Pekerjaan Pembesian dengan besi beton
126.7954 kg 11,258.30 1,427,500.12
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 7.8500 m2 8,425.00 66,136.25
Jumlah: 3,461,731.25
Nilai HSPK : 3,461,731.25
Beton Sloof S3 15x30 fc' 20,75 Mpa; K-
m3
250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 13.3300 m2 122,506.00 1,633,004.98
Pekerjaan Pembesian dengan besi beton
138.6524 kg 11,258.30 1,560,990.84
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 13.3300 m2 8,425.00 112,305.25
Jumlah: 4,312,723.84
Nilai HSPK : 4,312,723.84
Bekisting Untuk Kolom Struktur m2
Upah:
Mandor 0.0330 O.H 117,000.00 3,861.00
Kepala Tukang 0.0330 O.H 115,000.00 3,795.00
Tukang kayu 0.3300 O.H 112,500.00 37,125.00
Pembantu Tukang 0.6600 O.H 110,000.00 72,600.00
Jumlah: 117,381.00
Bahan:
Kayu Meranti Papan Bekisting 0.0400 m3 3,200,000.00 128,000.00
Paku Usuk 0.4000 kg 19,000.00 7,600.00
Minyak Bekisting 0.2000 ltr 28,300.00 5,660.00
Kayu Kamper Balok 4/6, 5/7 0.0150 m3 6,400,000.00 96,000.00
Multiplex Lapis film 1 sisi; t:12 mm 120x240 0.3500 lbr 125,000.00 43,750.00
Jumlah: 281,010.00
Nilai HSPK : 398,391.00

Bekisting Untuk Kolom (Bahan 2x pakai) m2

Bahan:
Bekisting Kolom (Bahan 2x pakai) 0.5000 m2 398,391.00 199,195.50
Jumlah: 199,195.50
Nilai HSPK : 199,195.50
Beton Kolom K1 40x40 fc' 20,75 Mpa; K-
m3
250
Bahan:
Pekerjaan Beton K-250 (f'c 20,75) 1.0000 m3 1,006,422.78 1,006,422.78
Bekisting Pile Cap (Bahan 2x pakai) 10.0000 m2 199,195.50 1,991,955.00
Pekerjaan Pembesian dengan besi beton
206.0391 kg 11,258.30 2,319,650.51
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 10.0000 m2 8,425.00 84,250.00
Jumlah: 5,402,278.29
Nilai HSPK : 5,402,278.29
Beton Kolom Kp 15x15 fc' 18,68 Mpa; K-
m3
225
Bahan:
Pekerjaan Beton K-225 (f'c 18,675) 1.0000 m3 989,328.53 989,328.53
Bekisting Pile Cap (Bahan 2x pakai) 13.3300 m2 199,195.50 2,655,276.02
Pekerjaan Pembesian dengan besi beton
164.8484 kg 11,258.30 1,855,913.22
(polos/ulir)
Pembongkaran Cetakan Bekisting Beton 13.3300 m2 8,425.00 112,305.25
Jumlah: 5,612,823.02
Nilai HSPK : 5,612,823.02

Pasangan Dinding Bata 1 : 5 (1 / 2 Bata) m2

Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 47,155.00
Bahan:
Batu bata merah Uk. 22x11x4.5 cm 65.0000 bh 730.00 47,450.00
Semen Portland 50 Kg 0.1936 zak 71,000.00 13,745.60
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Jumlah: 67,945.60
Nilai HSPK : 115,100.60
Pasangan Dinding Bata 1 : 3 (1 / 2 Bata -
m2
Trasraam)
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 47,155.00
Bahan:
Batu bata merah Uk. 22x11x4.5 cm 65.0000 bh 730.00 47,450.00
Semen Portland 50 Kg 0.2874 zak 71,000.00 20,405.40
Pasir pasang 0.0400 m3 150,000.00 6,000.00
Jumlah: 73,855.40
Nilai HSPK : 121,010.40
Plesteran Dinding Halus 1 : 5 m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0150 O.H 115,000.00 1,725.00
Tukang batu 0.1500 O.H 112,500.00 16,875.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 53,355.00
Bahan:
Semen Portland 50 Kg 0.1037 zak 71,000.00 7,361.28
Pasir pasang 0.0260 m3 150,000.00 3,900.00
Jumlah: 11,261.28
Nilai HSPK : 64,616.28
Plesteran Trasraam 1 : 3 m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0150 O.H 115,000.00 1,725.00
Tukang batu 0.1500 O.H 112,500.00 16,875.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 53,355.00
Bahan:
Semen Portland 50 Kg 0.1248 zak 71,000.00 8,860.80
Pasir pasang 0.0230 m3 150,000.00 3,450.00
Jumlah: 12,310.80
Nilai HSPK : 65,665.80
Acian m2
Upah:
Mandor 0.0100 O.H 117,000.00 1,170.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.2000 O.H 110,000.00 22,000.00
Jumlah: 35,570.00
Bahan:
Semen Portland 50 Kg 0.0650 zak 71,000.00 4,615.00
Jumlah: 4,615.00
Nilai HSPK : 40,185.00
Benangan Sudut 1 : 2 m2
Upah:
Mandor 0.0040 O.H 117,000.00 468.00
Kepala Tukang 0.0400 O.H 115,000.00 4,600.00
Tukang batu 0.0400 O.H 112,500.00 4,500.00
Pembantu Tukang 0.0800 O.H 110,000.00 8,800.00
Jumlah: 18,368.00
Bahan:
Semen Portland 50 Kg 0.0100 zak 71,000.00 710.00
Pasir pasang 0.0130 m3 150,000.00 1,950.00
Jumlah: 2,660.00
Nilai HSPK : 21,028.00
Pemasangan Lantai Keramik 40x40
m2
(Polished)
Upah:
Mandor 0.0350 O.H 117,000.00 4,095.00
Kepala Tukang 0.0350 O.H 115,000.00 4,025.00
Tukang batu 0.3500 O.H 112,500.00 39,375.00
Pembantu Tukang 0.7000 O.H 110,000.00 77,000.00
Jumlah: 124,495.00
Bahan:
Keramik Lantai 40x40 (Polished) 1.0608 m2 75,000.00 79,560.00
Semen Portland 50 Kg 0.1960 zak 71,000.00 13,916.00
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Semen Bewarna Yiyitan 1.3000 kg 11,200.00 14,560.00
Jumlah: 114,786.00
Nilai HSPK : 239,281.00
Pemasangan Lantai Keramik 40x40
m2
(Unpolished)
Upah:
Mandor 0.0350 O.H 117,000.00 4,095.00
Kepala Tukang 0.0350 O.H 115,000.00 4,025.00
Tukang batu 0.3500 O.H 112,500.00 39,375.00
Pembantu Tukang 0.7000 O.H 110,000.00 77,000.00
Jumlah: 124,495.00
Bahan:
Keramik Lantai40x40 (Unpolished) 1.0608 m2 70,000.00 74,256.00
Semen Portland 50 Kg 0.1960 zak 71,000.00 13,916.00
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Semen Bewarna Yiyitan 1.3000 kg 11,200.00 14,560.00
Jumlah: 109,482.00
Nilai HSPK : 233,977.00
Pemasangan Lantai Keramik 30x30
m2
(Unpolished)
Upah:
Mandor 0.0350 O.H 117,000.00 4,095.00
Kepala Tukang 0.0350 O.H 115,000.00 4,025.00
Tukang batu 0.3500 O.H 112,500.00 39,375.00
Pembantu Tukang 0.7000 O.H 110,000.00 77,000.00
Jumlah: 124,495.00
Bahan:
Keramik Lantai 30x30 (Unpolished) 1.0639 m2 66,500.00 70,751.35
Semen Portland 50 Kg 0.2000 zak 71,000.00 14,200.00
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Semen Bewarna Yiyitan 1.5000 kg 11,200.00 16,800.00
Jumlah: 108,501.35
Nilai HSPK : 232,996.35
Pemasangan Dinding Keramik 30x30
m2
(Unpolished)
Upah:
Mandor 0.0350 O.H 117,000.00 4,095.00
Kepala Tukang 0.0350 O.H 115,000.00 4,025.00
Tukang batu 0.3500 O.H 112,500.00 39,375.00
Pembantu Tukang 0.7000 O.H 110,000.00 77,000.00
Jumlah: 124,495.00
Bahan:
Keramik Dinding 30x30 (Unpolished) 1.0639 m2 67,500.00 71,815.28
Semen Portland 50 Kg 0.2000 zak 71,000.00 14,200.00
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Semen Bewarna Yiyitan 1.5000 kg 11,200.00 16,800.00
Jumlah: 109,565.28
Nilai HSPK : 234,060.28
Pemasangan Dinding Keramik 20x40
m2
(Unpolished)
Upah:
Mandor 0.0450 O.H 117,000.00 5,265.00
Kepala Tukang 0.0450 O.H 115,000.00 5,175.00
Tukang batu 0.4500 O.H 112,500.00 50,625.00
Pembantu Tukang 0.9000 O.H 110,000.00 99,000.00
Jumlah: 160,065.00
Bahan:
Keramik Dinding 20x40 (Unpolished) 1.0500 m2 65,500.00 68,775.00
Semen Portland 50 Kg 0.1900 zak 71,000.00 13,490.00
Pasir pasang 0.0200 m3 150,000.00 3,000.00
Semen Bewarna Yiyitan 1.9400 kg 11,200.00 21,728.00
Jumlah: 106,993.00
Nilai HSPK : 267,058.00
Pengecatan Tembok Exterior m2
Upah:
Mandor 0.0025 O.H 117,000.00 292.50
Kepala Tukang 0.0063 O.H 115,000.00 724.50
Tukang cat 0.0630 O.H 112,500.00 7,087.50
Pembantu Tukang 0.0250 O.H 110,000.00 2,750.00
Jumlah: 10,854.50
Bahan:
Cat Alkali Resisting Primer 0.1500 m2 32,750.00 4,912.50
Cat Dinding Weatherbond 0.2700 zak 62,500.00 16,875.00
Kertas Gosok no 150 0.5000 m3 8,750.00 4,375.00
Jumlah: 26,162.50
Nilai HSPK : 37,017.00
Pengecatan Tembok Interior m2
Upah:
Mandor 0.0025 O.H 117,000.00 292.50
Kepala Tukang 0.0042 O.H 115,000.00 483.00
Tukang cat 0.0420 O.H 112,500.00 4,725.00
Pembantu Tukang 0.0280 O.H 110,000.00 3,080.00
Jumlah: 8,580.50
Bahan:
Dempul Tembok (Cat Dasar) 0.1500 m2 35,000.00 5,250.00
Cat Tembok Interior 0.2700 zak 43,000.00 11,610.00
Jumlah: 16,860.00
Nilai HSPK : 25,440.50
Pemasangan Kusen Alumunium 4" m'
Upah:
Mandor 0.0021 O.H 117,000.00 245.70
Kepala Tukang 0.0043 O.H 115,000.00 494.50
Tukang besi 0.0430 O.H 112,500.00 4,837.50
Pembantu Tukang 0.0430 O.H 110,000.00 4,730.00
Jumlah: 10,307.70
Bahan:
Kusen Alumunium 4x10 cm, Profil 4 Inchi 1.1000 m' 95,000.00 104,500.00
Sekrup / ripet 2.0000 bh 210.00 420.00
Sealant 0.0600 tube 26,800.00 1,608.00
Jumlah: 106,528.00
Nilai HSPK : 116,835.70
Pintu Type P1 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 8.9200 m' 116,835.70 1,042,174.44
Daun Pintu Solidwood urat kayu fin.
2.0000 bh 1,350,000.00 2,700,000.00
Polyurethane uk. 90x210 cm
Handle Stainless 2.0000 set 340,000.00 680,000.00
Engsel Stainless Pintu 2.0000 stel 36,800.00 73,600.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Frame Vision Jendela Alumunium 1.8800 m' 139,250.00 261,790.00
Kaca 5 mm Rayben 1.0600 m2 113,850.00 120,681.00
Pasang Hak Angin Biasa 2.0000 stel 41,200.00 82,400.00
Engsel Stainless Jendela 2.0000 stel 25,900.00 51,800.00
Jumlah: 5,024,145.44
Nilai HSPK : 5,024,145.44
Pintu Type P2 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 7.1200 m' 116,835.70 831,870.18
Daun Pintu Solidwood urat kayu fin.
1.0000 bh 1,200,000.00 1,200,000.00
Polyurethane uk. 70x210 cm
Handle Stainless 1.0000 set 340,000.00 340,000.00
Engsel Stainless Pintu 1.0000 stel 36,800.00 36,800.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Frame Vision Jendela Alumunium 0.9800 m' 139,250.00 136,465.00
Kaca 5 mm Rayben 0.1400 m2 113,850.00 15,939.00
Pasang Hak Angin Biasa 2.0000 stel 41,200.00 82,400.00
Engsel Stainless Jendela 2.0000 stel 25,900.00 51,800.00
Jumlah: 2,706,974.18
Nilai HSPK : 2,706,974.18
Pintu Type P3 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 6.7200 m' 116,835.70 785,135.90
Daun Pintu Solidwood urat kayu fin.
1.0000 bh 1,250,000.00 1,250,000.00
Polyurethane uk. 80x210 cm
Handle Stainless 1.0000 set 340,000.00 340,000.00
Engsel Stainless Pintu 1.0000 stel 36,800.00 36,800.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Frame Vision Jendela Alumunium 2.4000 m' 139,250.00 334,200.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Kaca 5 mm Rayben 0.1650 m2 113,850.00 18,785.25
Pasang Hak Angin Biasa 2.0000 stel 41,200.00 82,400.00
Engsel Stainless Jendela 2.0000 stel 25,900.00 51,800.00
Jumlah: 2,922,521.15
Nilai HSPK : 2,922,521.15
Pintu Type P4 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 6.0400 m' 116,835.70 705,687.63
Daun Pintu Solidwood urat kayu fin.
2.0000 bh 1,090,000.00 2,180,000.00
Polyurethane uk. 60x170 cm
Handle Stainless 2.0000 set 340,000.00 680,000.00
Engsel Stainless Pintu 2.0000 stel 36,800.00 73,600.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Jumlah: 3,650,987.63
Nilai HSPK : 3,650,987.63
Pintu Type P5 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 9.3200 m' 116,835.70 1,088,908.72
Daun Pintu Solidwood urat kayu fin.
2.0000 bh 1,090,000.00 2,180,000.00
Polyurethane uk. 60x170 cm
Handle Stainless 2.0000 set 340,000.00 680,000.00
Engsel Stainless Pintu 2.0000 stel 36,800.00 73,600.00
Pasang Kunci Selot Alumunium 1.0000 bh 11,700.00 11,700.00
Jumlah: 4,034,208.72
Nilai HSPK : 4,034,208.72
Jendela Type J1 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 13.4400 m' 116,835.70 1,570,271.81
Frame Vision Jendela Alumunium 12.2400 m' 139,250.00 1,704,420.00
Kaca 5 mm Rayben 1.7604 m2 113,850.00 200,421.54
Pasang Kunci Selot Alumunium 6.0000 bh 11,700.00 70,200.00
Pasang Hak Angin Biasa 6.0000 stel 41,200.00 247,200.00
Engsel Stainless Jendela 12.0000 stel 25,900.00 310,800.00
Jumlah: 4,103,313.35
Nilai HSPK : 4,103,313.35
Jendela Type J2 unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 10.4000 m' 116,835.70 1,215,091.28
Frame Vision Jendela Alumunium 12.2400 m' 139,250.00 1,704,420.00
Kaca 5 mm Rayben 1.7604 m2 113,850.00 200,421.54
Pasang Kunci Selot Alumunium 6.0000 bh 11,700.00 70,200.00
Pasang Hak Angin Biasa 6.0000 stel 41,200.00 247,200.00
Engsel Stainless Jendela 12.0000 stel 25,900.00 310,800.00
Jumlah: 3,748,132.82
Nilai HSPK : 3,748,132.82
Pasangan Rooster (J3) m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 47,155.00
Bahan:
Rooster 42.0000 bh 10,000.00 420,000.00
Semen Portland 50 Kg 0.1936 zak 71,000.00 13,745.60
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Jumlah: 440,495.60
Nilai HSPK : 487,650.60
Pasangan Rooster (J4) m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang batu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 47,155.00
Bahan:
Rooster 42.0000 bh - 0.00
Semen Portland 50 Kg 0.1936 zak 71,000.00 13,745.60
Pasir pasang 0.0450 m3 150,000.00 6,750.00
Jumlah: 20,495.60
Nilai HSPK : 67,650.60
Jendela Type BV (Bouvenlist) unit
Bahan:
Kusen Profil Alumunium Silver 5x10 cm 2.3200 m' 116,835.70 271,058.82
Kaca 5 mm Polos 0.1798 m2 113,850.00 20,470.23
Jumlah: 291,529.05
Nilai HSPK : 291,529.05
Pemasangan Saklar Tunggal titik
Upah:
Kepala Tukang 0.0500 O.H 115,000.00 5,750.00
Tukang Listrik 0.2000 O.H 112,500.00 22,500.00
Pembantu Tukang 0.0010 O.H 110,000.00 110.00
Jumlah: 28,360.00
Bahan:
Saklar Tunggal 1.0000 unit 29,300.00 29,300.00
Jumlah: 29,300.00
Nilai HSPK : 57,660.00
Pemasangan Saklar Ganda titik
Upah:
Kepala Tukang 0.0500 O.H 115,000.00 5,750.00
Tukang Listrik 0.2000 O.H 112,500.00 22,500.00
Pembantu Tukang 0.0010 O.H 110,000.00 110.00
Jumlah: 28,360.00
Bahan:
Saklar Ganda 1.0000 unit 45,400.00 45,400.00
Jumlah: 45,400.00
Nilai HSPK : 73,760.00
Pemasangan Titik Stop Kontak titik
Upah:
Kepala Tukang 0.0500 O.H 115,000.00 5,750.00
Tukang Listrik 0.2000 O.H 112,500.00 22,500.00
Pembantu Tukang 0.0010 O.H 110,000.00 110.00
Jumlah: 28,360.00
Bahan:
Stop Kontak 200 W 1.0000 bh 18,000.00 18,000.00
Kabel NYY 500 Volt 3 x 2,5 mm2 10.0000 m' 10,700.00 107,000.00
Pipa Paralon 5 / 8 2.5000 lonjor 20,000.00 50,000.00
Tee Dos PVC 1.0000 bh 4,500.00 4,500.00
Jumlah: 179,500.00
Nilai HSPK : 207,860.00
Instalasi Titik Lampu titik
Upah:
Kepala Tukang 0.0500 O.H 115,000.00 5,750.00
Tukang Listrik 0.5000 O.H 112,500.00 56,250.00
Pembantu Tukang 0.3000 O.H 110,000.00 33,000.00
Jumlah: 95,000.00
Bahan:
Kabel NYM 3 x 2,5 mm 10.0000 m' 10,050.00 100,500.00
Isolator 4.0000 unit 5,000.00 20,000.00
Fiting Plafon 1.0000 bh 42,500.00 42,500.00
Pipa Paralon 5 / 8 2.5000 lonjor 20,000.00 50,000.00
Tee Dos PVC 1.0000 bh 4,500.00 4,500.00
Jumlah: 217,500.00
Nilai HSPK : 312,500.00
Bekisting Untuk Balok Struktur m2
Upah:
Mandor 0.0330 O.H 117,000.00 3,861.00
Kepala Tukang 0.0330 O.H 115,000.00 3,795.00
Tukang kayu 0.3300 O.H 112,500.00 37,125.00
Pembantu Tukang 0.6600 O.H 110,000.00 72,600.00
Jumlah: 117,381.00
Bahan:
Kayu Meranti Papan Bekisting 0.0400 m3 3,200,000.00 128,000.00
Paku Usuk 0.4000 kg 19,000.00 7,600.00
Minyak Bekisting 0.2000 ltr 28,300.00 5,660.00
Kayu Kamper Balok 4/6, 5/7 0.0180 m3 6,400,000.00 115,200.00
Multiplex Lapis film 1 sisi; t:12 mm 120x240 0.3500 lbr 125,000.00 43,750.00
Jumlah: 300,210.00
Nilai HSPK : 417,591.00

Bekisting Untuk Balok (Bahan 2x pakai) m2

Bahan:
Bekisting Balok (Bahan 2x pakai) 0.5000 m2 417,591.00 208,795.50
Jumlah: 208,795.50
Nilai HSPK : 208,795.50
Beton Balok B1 30x60 fc' 20,75 Mpa; K-
m3
250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 6.6600 m2 208,795.50 1,390,578.03
Besi Beton (polos/ulir) 187.1534 kg 8,500.00 1,590,803.91
Pembongkaran Cetakan Bekisting Beton 6.6600 m2 8,425.00 56,110.50
Jumlah: 4,027,492.44
Nilai HSPK : 4,027,492.44
Beton Balok B1A 30x60 fc' 20,75 Mpa; K-
m3
250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) #NAME? m2 208,795.50 #NAME?
Besi Beton (polos/ulir) 147.5922 kg 8,500.00 1,254,534.05
Pembongkaran Cetakan Bekisting Beton #NAME? m2 8,425.00 #NAME?
Jumlah: #NAME?
Nilai HSPK : #NAME?
Beton Balok B2 20x35 fc' 20,75 Mpa; K-
m3
250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 10.0000 m2 208,795.50 2,087,955.00
Besi Beton (polos/ulir) 156.5653 kg 8,500.00 1,330,805.13
Pembongkaran Cetakan Bekisting Beton 10.0000 m2 8,425.00 84,250.00
Jumlah: 4,493,010.13
Nilai HSPK : 4,493,010.13
Beton Balok B3 15x30 fc' 20,75 Mpa; K-
m3
250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 13.3300 m2 208,795.50 2,783,244.02
Besi Beton (polos/ulir) 184.9613 kg 8,500.00 1,572,170.77
Pembongkaran Cetakan Bekisting Beton 13.3300 m2 8,425.00 112,305.25
Jumlah: 5,457,720.04
Nilai HSPK : 5,457,720.04
Beton Balok BK 30x50 - 30x30 fc' 20,75
m3
Mpa; K-250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 6.6600 m2 208,795.50 1,390,578.03
Besi Beton (polos/ulir) 167.5441 kg 8,500.00 1,424,124.69
Pembongkaran Cetakan Bekisting Beton 6.6600 m2 8,425.00 56,110.50
Jumlah: 3,860,813.22
Nilai HSPK : 3,860,813.22
Bekisting Untuk Plat Lantai dan Dinding
m2
Beton
Upah:
Mandor 0.0330 O.H 117,000.00 3,861.00
Kepala Tukang 0.0330 O.H 115,000.00 3,795.00
Tukang kayu 0.3300 O.H 112,500.00 37,125.00
Pembantu Tukang 0.6600 O.H 110,000.00 72,600.00
Jumlah: 117,381.00
Bahan:
Paku Usuk 0.4000 kg 19,000.00 7,600.00
Minyak Bekisting 0.2000 ltr 28,300.00 5,660.00
Kayu Meranti Balok 0.0400 m3 4,500,000.00 180,000.00
Kayu Kamper Balok 4/6, 5/7 0.0150 m3 6,400,000.00 96,000.00
Multiplex Lapis film 1 sisi; t:12 mm 120x240 0.3500 lbr 125,000.00 43,750.00
Jumlah: 333,010.00
Nilai HSPK : 450,391.00

Bekisting Untuk Lantai (Bahan 2x pakai) m2

Bahan:
Bekisting Lantai (Bahan 2x pakai) 0.5000 m2 450,391.00 225,195.50
Jumlah: 225,195.50
Nilai HSPK : 225,195.50
Beton Plat Lantai tbl. 12 cm f'c 20,75
m3
Mpa; K-250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 8.3333 m2 225,195.50 1,876,629.17
Besi Beton (polos/ulir) 41.9931 kg 8,500.00 356,940.99
Pembongkaran dan pemasangan Bekisting
8.3333 m2 8,425.00 70,208.33
Untuk Lantai
Jumlah: 3,293,778.49
Nilai HSPK : 3,293,778.49
Beton Plat Lantai tbl. 10 cm f'c 20,75
m3
Mpa; K-250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 10.0000 m2 225,195.50 2,251,955.00
Besi Beton (polos/ulir) 94.5358 kg 8,500.00 803,553.95
Pembongkaran dan pemasangan Bekisting
10.0000 m2 8,425.00 84,250.00
Untuk Lantai
Jumlah: 4,129,758.95
Nilai HSPK : 4,129,758.95
Beton Plat Lantai tbl. 8 cm f'c 20,75 Mpa;
m3
K-250
Bahan:
Beton Readymix K250 (fc' 20,75) 1.0000 m3 990,000.00 990,000.00
Bekisting Pile Cap (Bahan 2x pakai) 12.5000 m2 225,195.50 2,814,943.75
Besi Beton (polos/ulir) 169.5478 kg 8,500.00 1,441,156.54
Pembongkaran dan pemasangan Bekisting
12.5000 m2 8,425.00 105,312.50
Untuk Lantai
Jumlah: 5,351,412.79
Nilai HSPK : 5,351,412.79
Beton Plat Lantai tbl. 10 cm f'c 18,68
m3
Mpa; K-225
Bahan:
Beton Readymix K225 (fc' 18,68) 1.0000 m3 960,000.00 960,000.00
Bekisting Pile Cap (Bahan 2x pakai) 10.0000 m2 225,195.50 2,251,955.00
Besi Beton (polos/ulir) 94.5358 kg 8,500.00 803,553.95
Pembongkaran dan pemasangan Bekisting
10.0000 m2 8,425.00 84,250.00
Untuk Lantai
Jumlah: 4,099,758.95
Nilai HSPK : 4,099,758.95
Beton Plat Lantai tbl. 7 cm f'c 18,68 Mpa;
m3
K-225
Bahan:
Beton Readymix K225 (fc' 18,68) 1.0000 m3 960,000.00 960,000.00
Bekisting Pile Cap (Bahan 2x pakai) 14.2857 m2 225,195.50 3,217,078.57
Besi Beton (polos/ulir) 43.2163 kg 8,500.00 367,338.95
Pembongkaran dan pemasangan Bekisting
14.2857 m2 8,425.00 120,357.14
Untuk Lantai
Jumlah: 4,664,774.66
Nilai HSPK : 4,664,774.66
Pemasangan Plafond Gypsum 4,5 mm
m2
(Rangka Metal Furing)
Upah:
Mandor 0.0750 O.H 117,000.00 8,775.00
Kepala Tukang 0.0250 O.H 115,000.00 2,875.00
Tukang kayu 0.2500 O.H 112,500.00 28,125.00
Pembantu Tukang 0.1500 O.H 110,000.00 16,500.00
Jumlah: 56,275.00
Bahan:
Gypsum Kalsiboard Tbl. 4,5 mm 120x240 0.3500 lembar 106,750.00 37,362.50
Metal Furing 40/40 0.7500 m' 10,000.00 7,500.00
Metal Furing 20/40 2.0000 m' 8,750.00 17,500.00
Kawat Penggantung 2.0000 m' 7,500.00 15,000.00
Paku Asbes Sekrup 4 4.0000 bh 7,500.00 30,000.00
Jumlah: 107,362.50
Nilai HSPK : 163,637.50
Pemasangan List Gypsum m2
Upah:
Mandor 0.0030 O.H 117,000.00 351.00
Kepala Tukang 0.0050 O.H 115,000.00 575.00
Tukang kayu 0.0500 O.H 112,500.00 5,625.00
Pembantu Tukang 0.0500 O.H 110,000.00 5,500.00
Jumlah: 12,051.00
Bahan:
List Plafond Gypsum Uk. 5/5 1.1000 m' 10,000.00 11,000.00
List Plafond Gypsum Uk. 5/5 1.0500 kg 16,000.00 16,800.00
Paku Asbes Sekrup 4 4.0000 bh 150.00 600.00
Jumlah: 28,400.00
Nilai HSPK : 40,451.00
Pekerjaan 1 m2 Lapisan Ijuk Tbl. 10 cm m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Pembantu Tukang 0.1500 O.H 110,000.00 16,500.00
Jumlah: 18,255.00
Bahan:
Ijuk 6.0000 bh 27,500.00 165,000.00
Jumlah: 165,000.00
Nilai HSPK : 183,255.00
Pekerjaan 1 m3 Lapisan Kerikil m2
Upah:
Mandor 0.0150 O.H 117,000.00 1,755.00
Pembantu Tukang 0.1500 O.H 110,000.00 16,500.00
Jumlah: 18,255.00
Bahan:
Batu Pecah Mesin 1/2 1.0000 m' 250,000.00 250,000.00
Jumlah: 250,000.00
Nilai HSPK : 268,255.00
Pembongkaran Bangunan Eksisting Ls
Pekerjaan:
Luas Bangunan yang akan dibongkar 547.8200 m2
Luas Modul 72.0000 m2
Harga Permodul 1.0000 m2 950,000.00
Jumlah: 7,228,180.56
Nilai HSPK : 7,228,180.56
Pengangkutan Tanah Keluar Lokasi Ls
Pekerjaan:
Pengangkutan Tanah Keluar Lokasi 1.0000 ls 500,000.00 500,000.00
Jumlah: 500,000.00
Nilai HSPK : 500,000.00
Pengukuran dan Pemasangan Bowplank
Titik
(UITZET)
Upah:
Mandor 0.0045 O.H 117,000.00 526.50
Kepala Tukang 0.0100 O.H 115,000.00 1,150.00
Tukang kayu 0.1000 O.H 112,500.00 11,250.00
Pembantu Tukang 0.1000 O.H 110,000.00 11,000.00
Jumlah: 23,926.50
Bahan:
Paku Biasa 2-5 inchi 0.0500 Doz 27,000.00 1,350.00
Kayu Meranti Papan 2/20, 4/10 0.0080 m3 3,200,000.00 25,600.00
Kayu Meranti Usuk 4/6, 5/7 0.0120 m3 4,500,000.00 54,000.00
Jumlah: 80,950.00
Nilai HSPK : 104,876.50
Pekerjaan Pemasangan Besi Profil kg
Upah:
Mandor 0.0030 O.H 117,000.00 351.00
Kepala Tukang 0.0060 O.H 112,500.00 675.00
Tukang Las 0.0600 O.H 112,500.00 6,750.00
Tenaga Kasar 0.0600 O.H 110,000.00 6,600.00
Jumlah: 14,376.00
Bahan:
Electrode Baja 0.0400 Doz 55,000.00 2,200.00
Besi Profil (Baja Konstruksi) 1.1500 kg 10,000.00 11,500.00
Jumlah: 13,700.00

Sewa:
Sewa Welding Set (min 5 jam) 0.0700 Hari 28,500.00 1,995.00
Jumlah: 1,995.00
Nilai HSPK : 30,071.00

Pemasangan Atap Genteng Karangpilang Titik

Upah:
Mandor 0.0080 O.H 117,000.00 936.00
Kepala Tukang 0.0080 O.H 115,000.00 920.00
Tukang kayu 0.0750 O.H 112,500.00 8,437.50
Pembantu Tukang 0.1500 O.H 110,000.00 16,500.00
Jumlah: 26,793.50
Bahan:
Genteng Karangpilang 25.0000 buah 20,000.00 500,000.00
Jumlah: 500,000.00
Nilai HSPK : 526,793.50
3.14
6165.38

Strouss Dia.40 cm ; f'c 20.75 Pilecap P1 2400x2400x40 cm be

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 19 - 4 2.90
5 16 - 5 2.90
6 1.00 10.00 13 10.419 6 2.90
7 10 - 7 2.90
8 1.26 8.00 8 3.965 8
9 8 - 9
10 6 - 10
JUMLAH 14.384

Vol Beton /m3 Vol Beton /m3


3.14 0.04 1 0.1256 2.4

Berat besi Berat besi


14.384 0.1256 114.52 258.360

Pilecap P3 2400x2600x40 cm beton fc' 20,75 Pilecap P4 3200x3200x40 cm be

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 3.10 17.00 16 83.178 4 3.70
5 2.90 19.00 16 86.966 5 3.70
6 3.10 17.00 13 54.911 6 3.70
7 2.90 19.00 13 57.411 7 3.70
8 8 - 8
9 8 - 9
10 6 - 10
JUMLAH 282.467
Vol Beton /m3 Vol Beton /m3
2.4 2.6 0.4 2.496 3.2

Berat besi Berat besi


282.467 2.496 113.17 523.533

Sloof S1 25x50 beton f'c 20,75 Sloof S2 20x35 beton f'c

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 1.00 8.00 16 12.627 4
5 1.00 2.00 13 2.084 5 1.00
6 12 - 6
7 1.35 7.00 10 5.826 7
8 8 - 8 0.95
9 8 - 9
10 6 - 10
JUMLAH 20.537

Vol Beton /m3 Vol Beton /m3


0.25 0.5 1 0.125 0.2

Berat besi Berat besi


20.537 0.125 164.29 8.876

Kolom K1 40x40 beton f'c 20,75 Kolom Kp 15x15 beton f'c

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 1.00 12.00 19 26.708 4
5 13 - 5
6 12 - 6
7 1.45 7.00 10 6.258 7 1.00
8 8 - 8 0.45
9 8 - 9
10 6 - 10
JUMLAH 32.966

Vol Beton /m3 Vol Beton /m3


0.4 0.4 1 0.16 0.15

Berat besi Berat besi


32.966 0.16 206.04 3.709

Balok B1A 30x60 beton f'c 20,75 Balok B2 20x35 beton f'c

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 1.00 11.00 16 17.362 4
5 1.00 2.00 13 2.084 5 1.00
6 12 - 6
7 1.65 7.00 10 7.121 7
8 8 - 8 0.95
9 8 - 9
10 6 - 10
JUMLAH 26.567

Vol Beton /m3 Vol Beton /m3


0.3 0.6 1 0.18 0.2

Berat besi Berat besi


26.567 0.18 147.59 10.960

Balok BK 30x50 / 30x30 beton f'c 20,75 Pelat 12

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 1.00 8.00 16 12.627 4
5 1.00 2.00 13 2.084 5
6 12 - 6
7 1.25 7.00 10 5.395 7 1.00
8 8 - 8 1.00
9 8 - 9
10 6 - 10
JUMLAH 20.105

Vol Beton /m3 Vol Beton /m3


0.3 0.4 1 0.12 1

Berat besi Berat besi


20.105 0.12 167.54 5.039

Pelat 8 Pelat 7

Panjang Jumlah Diameter Berat Panjang


No No
(m) (bh) (mm) (kg) (m)

1 32 - 1
2 25 - 2
3 22 - 3
4 16 - 4
5 13 - 5
6 12 - 6
7 1.00 11.00 10 6.782 7
8 1.00 11.00 10 6.782 8 1.00
9 8 - 9
10 6 - 10
JUMLAH 13.564

Vol Beton /m3 Vol Beton /m3


1 1 0.08 0.08 1

Berat besi Berat besi


13.564 0.08 169.55 3.025
p P1 2400x2400x40 cm beton fc' 20,75 Pilecap P2 2400x1200x40 cm beton fc' 20,75

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
17.00 16 77.812 4 2.90 9.00 16 41.195
17.00 16 77.812 5 1.70 17.00 16 45.614
17.00 13 51.368 6 2.90 9.00 13 27.195
17.00 13 51.368 7 1.70 17.00 13 30.112
8 - 8 8 -
8 - 9 8 -
6 - 10 6 -
JUMLAH 258.360 JUMLAH 144.116

Vol Beton /m3


2.4 0.4 2.304 2.4 1.2 0.4 1.152

Berat besi
2.304 112.14 144.116 1.152 125.10

p P4 3200x3200x40 cm beton fc' 20,75 Pilecap PT 600x1550x30 cm beton fc' 20,75

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
27.00 16 157.676 4 1.85 5.00 13 9.638
27.00 16 157.676 5 0.90 12.00 13 11.253
27.00 13 104.091 6 1.85 5.00 13 9.638
27.00 13 104.091 7 0.90 12.00 13 11.253
8 - 8 8 -
8 - 9 8 -
6 - 10 6 -
JUMLAH 523.533 JUMLAH 41.782
Vol Beton /m3
3.2 0.4 4.096 0.6 1.55 0.3 0.279

Berat besi
4.096 127.82 41.782 0.279 149.76

Sloof S2 20x35 beton f'c 20,75 Sloof S3 15x30 beton f'c 20,75

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
16 - 4 16 -
6.00 13 6.252 5 1.00 4.00 13 4.168
12 - 6 12 -
10 - 7 10 -
7.00 8 2.624 8 0.75 7.00 8 2.072
8 - 9 8 -
6 - 10 6 -
JUMLAH 8.876 JUMLAH 6.239

Vol Beton /m3


0.35 1 0.07 0.15 0.3 1 0.045

Berat besi
0.07 126.80 6.239 0.045 138.65

Kolom Kp 15x15 beton f'c 20,75 Balok B1 30x60 beton f'c 20,75

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
19 - 4 1.00 11.00 19 24.483
13 - 5 1.00 2.00 13 2.084
12 - 6 12 -
4.00 10 2.466 7 1.65 7.00 10 7.121
7.00 8 1.243 8 8 -
8 - 9 8 -
6 - 10 6 -
JUMLAH 3.709 JUMLAH 33.688

Vol Beton /m3


0.15 1 0.0225 0.3 0.6 1 0.18

Berat besi
0.0225 164.85 33.688 0.18 187.15

Balok B2 20x35 beton f'c 20,75 Balok B3 15x30 beton f'c 20,75

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
16 - 4 16 -
8.00 13 8.336 5 1.00 6.00 13 6.252
12 - 6 12 -
10 - 7 10 -
7.00 8 2.624 8 0.75 7.00 8 2.072
8 - 9 8 -
6 - 10 6 -
JUMLAH 10.960 JUMLAH 8.323

Vol Beton /m3


0.35 1 0.07 0.15 0.3 1 0.045

Berat besi
0.07 156.57 8.323 0.045 184.96

Pelat 12 Pelat 10

Jumlah Diameter Berat Panjang Jumlah Diameter Berat


No
(bh) (mm) (kg) (m) (bh) (mm) (kg)

32 - 1 32 -
25 - 2 25 -
22 - 3 22 -
16 - 4 16 -
13 - 5 13 -
12 - 6 12 -
4.33 10 2.672 7 1.00 7.67 10 4.727
6.00 8 2.368 8 1.00 7.67 10 4.727
8 - 9 8 -
6 - 10 6 -
JUMLAH 5.039 JUMLAH 9.454

Vol Beton /m3


1 0.12 0.12 1 1 0.1 0.1

Berat besi
0.12 41.99 9.454 0.1 94.54

Pelat 7

Jumlah Diameter Berat


(bh) (mm) (kg)

32 -
25 -
22 -
16 -
13 -
12 -
10 -
7.67 8 3.025
8 -
6 -
JUMLAH 3.025

1 0.07 0.07

0.07 43.22
Bekisting P1 2400x2400x400cm f'c 20,75

2.40 x 2.40 x 1.00 x 1.00 x 1.00


1 / 5.76
2.4 + 2.4 + 2.4 + 2.4
9.6 x 0.174 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting P2 180x180x40cm f'c 20,75

2.40 x 1.20 x 1.00 x 1.00 x 1.00


1 / 2.88
2.4 + 2.4 + 1.2 + 1.2
7.2 x 0.347 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting P3 2400x2400x400cm f'c 20,75

2.40 x 2.40 x 1.00 x 1.00 x 1.00


1 / 5.76
2.4 + 2.6 + 2.6 + 1
8.6 x 0.174 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting PT 1200x1200x250cm f'c 20,75

1.20 x 1.20 x 1.00 x 1.00 x 1.00


1 / 1.44
1.2 + 1.2 + 1.2 + 1.2
4.8 x 0.694 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting S1 25x50cm f'c 20,75

0.25 x 0.55 x 1.00 x 1.00 x 1.00


1 / 0.1375
0.55 + 0.55 +
1.1 x 7.27 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting S2 20x35cm f'c 20,75

0.20 x 0.35 x 1.00 x 1.00 x 1.00


1 / 0.07
0.2 + 0.35 +
0.55 x 14.29 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting S3 15x30cm f'c 20,75

0.15 x 0.30 x 1.00 x 1.00 x 1.00


1 / 0.045
0.3 + 0.3 +
0.6 x 22.22 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting K1 40x40cm f'c 20,75

0.40 x 0.40 x 1.00 x 1.00 x 1.00


1 / 0.16
0.4 + 0.4 + 0.4 + 0.4
1.6 x 6.25 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting Kp 15x15cm f'c 18,68

0.15 x 0.15 x 1.00 x 1.00 x 1.00


1 / 0.0225
0.15 + 0.15
0.3 x 44.44 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting B1 30x60cm f'c 20,75


0.30 x 0.48 x 1.00 x 1.00 x 1.00
1 / 0.144
0.48 + 0.48 +
0.96 x 6.94 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting B1 20x40cm f'c 20,75

0.20 x 0.28 x 1.00 x 1.00 x 1.00


1 / 0.056
0.28 + 0.28 +
0.56 x 17.86 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting B3 15x40cm f'c 20,75

0.15 x 0.28 x 1.00 x 1.00 x 1.00


1 / 0.042
0.28 + 0.28 +
0.56 x 23.81 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting BK 30x60cm f'c 20,75

0.30 x 0.48 x 1.00 x 1.00 x 1.00


1 / 0.144
0.48 + 0.48 +
0.96 x 6.94 x 1 x 1 x 1
1 m3 butuh bekisting

Bekisting RB 15x30cm f'c 20,75

0.15 x 0.30 x 1.00 x 1.00 x 1.00


1 / 0.045
0.3 + 0.3 +
0.6 x 22.22 x 1 x 1 x 1
1 m3 butuh bekisting
= 5.76
= 0.17 m
= 9.6 m2
= 1.67
= 1.67
1.66 m2

= 2.88
= 0.35 m
= 7.2 m2
= 2.50
= 2.50
2.50 m2

= 5.76
= 0.17 m
= 8.6 m2
= 1.49
= 1.49
1.49 m2

= 1.44
= 0.69 m
= 4.8 m2
= 3.33
= 3.33
3.33 m2

= 0.1375
= 7.27 m
= 1.1 m2
= 8.00
= 8.00
8.00 m2

= 0.07
= 14.29 m
= 0.55 m2
= 7.86
= 7.86
7.85 m2

= 0.045
= 22.22 m
= 0.6 m2
= 13.33
= 13.33
13.33 m2

= 0.16
= 6.25 m
= 1.6 m2
= 10.00
= 10.00
10.00 m2

= 0.0225
= 44.44 m
= 0.3 m2
= 13.33
= 13.33
13.33 m2
= 0.144
= 6.94 m
= 0.96 m2
= 6.67
= 6.67
6.66 m2

= 0.056
= 17.86 m
= 0.56 m2
= 10.00
= 10.00
10.00 m2

= 0.042
= 23.81 m
= 0.56 m2
= 13.33
= 13.33
13.33 m2

= 0.144
= 6.94 m
= 0.96 m2
= 6.67
= 6.67
6.66 m2

= 0.045
= 22.22 m
= 0.6 m2
= 13.33
= 13.33
13.33 m2
No URAIAN Keterangan Panjang

A PEKERJAAN PENDAHULUAN
1 Uitzet dgn Waterpass/Theodolit
2 Pengukuran dan Pemasangan Bowplank (UITZET)
3 Pembongkaran Bangunan Existing
4 Pembersihan Lokasi
5 Buangan Sisa Bongkaran dan Galian tanah Sisa Bongkaran Dinding 116.7
Sisa Bongkaran Atap
Sisa Bongkaran Keramik
Buangan Galian Tanah Pondasi
Pondasi P1
Pondasi P2
Pondasi P3
Pondasi PT
Sloof S1 56.55
Sloof S2 30.3
Sloof S3 85
B PEKERJAAN GEDUNG
B1 PEKERJAAN LANTAI 1 Elv. +0.00
I PEKERJAAN TANAH
1 Galian Tanah untuk Konstruksi Pondasi P1
Pondasi P2
Pondasi P3
Pondasi PT
Sloof S1 56.55
Sloof S2 30.3
Sloof S3 85
2 Urugan Pasir Padat Bawah Pilecap tbl. 10 cm Pondasi P1
Pondasi P2
Pondasi P3
Pondasi PT
Sloof S1 56.55
Sloof S2 30.3
Sloof S3 85
3 Lantai Kerja 1:3:5 tbl.5 cm Pondasi P1
Pondasi P2
Pondasi P3
Pondasi PT
Sloof S1 56.55
Sloof S2 30.3
Sloof S3 85
4 Urugan Tanah Kembali
II PEKERJAAN PONDASI
1 Pembuatan Lubang Strouss dia. 40 cm Depth 7 m 7
2 Pondasi Rollag Batu bata 1:3 61.2
III PEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Beton Strouss Pile diameter 40 cm ; Depth. 7 m 7
2 Pilecap P1 2400x2400x40 cm beton fc' 20,75 2.4
3 Pilecap P2 2400x1200x40 cm beton fc' 20,75 2.4
4 Pilecap P3 2400x2600x40 cm beton fc' 20,75 2.4
5 Pilecap PT 600x1185x30 cm beton fc' 20,75 0.6
6 Sloof S1 25x50 cm beton fc' 20,75 87
7 Sloof S2 20x35 cm beton fc' 20,75 67.5
8 Sloof S3 15x30 cm beton fc' 20,75 89.3
9 Kolom K1 40x40 cm beton fc' 20,75 0.4
10 Kolom Kp 15x15 cm beton fc' 18,68 0.15
IV PEKERJAAN ARSITEKTUR
PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan dinding batu bata 1:5 182.275
DIKURANGI
Kusen P1
Kusen P2
Kusen P5
Kusen J1
Kusen J2
Kusen J3
2 Pasangan batu bata trasraam 1:3 29.85
DIKURANGI
Kusen P3
Kusen BV
3 Plesteran dinding halus 1:5
4 Plesteran Tras Raam 1:3
DIKURANGI
Keramik Dinding KM
5 Acian dinding
6 Acian beton 15 % Kolom K1 0.4
Kolom Kp 0.15
7 Benangan beton 15 % Kolom 4
Balok 267.925
PEKERJAAN LANTAI
1 Urugan Sirtu padat h = 15 cm Levelling
2 Urugan Pasir padat 10 cm
3 Lantai Kerja 1:3:5 tbl.5 cm
4 Lantai
Keramik Lantai dan teras 40x40 cm Warna/motif
(polished)
Teras
5 Keramik Lantai KM 40x40 cm (unpolished)
6 Keramik Dinding KM 20x40 cm (unpolished) Siswa 32.3
PEKERJAAN PENGECATAN
1 Cat Dinding Exterior 41.675
2 Cat Plafond
3 Cat Beton Expose
4 Cat Dinding Interior 222.15
PEKERJAAN KUSEN
1 Pintu Type P1
2 Pintu Type P2
3 Pintu Type P3
4 Pintu Type P5
5 Jendela Type J1
6 Jendela Type J2
7 Jendela Type J3 1.5
8 Jendela Type BV
PEKERJAAN PLAFOND
1 Plafond Kalsiboard 4,5 mm (Rangka Metal Furing)
2 List Plafond Kalsiboard uk.5/5 75.45
V PEKERJAAN MEKANIKAL ELEKTRIKAL
PEKERJAAN ELEKTRIKAL
1 Saklar Tunggal
2 Saklar Ganda
3 Pemasangan Titik Stop Kontak 200 W
4 Box MCB 6 port
5 MCB 1 phasa 6 A ex. Merlin Gerlin / setara
6 Instalasi Titik Lampu Gedung
7 Dari Panel Indul Kabel NYY 4x4 mm
8 LED 5 W
9 LED 7 W
B2 PEKERJAAN LANTAI 2 Elv. +4.00
I PEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Balok B1 (30x60) beton fc' 20,75 86.55
2 Balok B2 (20x40) beton fc' 20,75 135.25
4 Balok B3 (15/40) beton fc' 20,75 19.425
5 Balok BK (30x60)-(30x40) Beton fc' 20,75 30
6 Plat 12 cm beton fc' 20,75
7 Beton Tangga 12 cm beton fc' 20,75 Tangga 6.3
Bordes 2.35
8 Kolom K1 40x40 cm beton fc' 20,75 0.4
9 Kolom Kp 15x15 cm beton fc' 18,68 0.15
10 Balok RB1 (20x50) beton fc' 20,75 67
11 Balok RB2 (20x40) beton fc' 20,75 17.6
12 Balok RB3 (15/20) beton fc' 20,75 33.8
PEKERJAAN BAJA
1 Kolom Pedestal Kuda-kuda WF 150.75.5.7
2 Kuda-Kuda Baja WF 150.75.5.7
KK1 WF 150.75.5.7 12.12
1/2 KK WF 150.75.5.7 6.35
Jurai JR 1 WF 150.75.5.7 8.16
Stifner 0.00005712
Baseplate 0.000013
3 Gording Canal C 150.50.20.2,3 421.7
4 Wind Braching 79.32
5 Penggantung Gording 209.72
6 Baut M12
7 Anchor Bolt

IV PEKERJAAN ARSITEKTUR
PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan dinding batu bata 1:5 78
DIKURANGI
Kusen P1
Kusen P5
Kusen J4
2 Pasangan batu bata trasraam 1:3 28.54
DIKURANGI
Kusen P3
Kusen P4
Kusen BV
3 Plesteran dinding halus 1:5
4 Plesteran Tras Raam 1:3
DIKURANGI
Keramik Dinding KM
5 Acian dinding
6 Acian beton 15 % Kolom K1 0.4
Kolom Kp 0.15
7 Benangan beton 15 % Kolom 4
Balok 267.925
PEKERJAAN LANTAI
1 Lantai Kerja 1:3:5 tbl.5 cm
2 Lantai
Keramik Lantai dan teras 40x40 cm Warna/motif
(polished)
3 Keramik Lantai KM 30x30 cm (unpolished)
4 Keramik Dinding KM 20x40 cm (unpolished) 32.3
PEKERJAAN PENGECATAN
1 Cat Dinding Exterior 85.3
2 Cat Plafond
3 Cat Dinding Interior 130.65
PEKERJAAN KUSEN
1 Pintu Type P1
2 Pintu Type P3
3 Pintu Type P5
4 Jendela Type J4 2
5 Jendela Type BV
PEKERJAAN PLAFOND
1 Plafond Kalsiboard 4,5 mm (Rangka Metal Furing)
2 List Plafond Kalsiboard uk.5/5 268
PEKERJAAN PENUTUP ATAP GENTENG
1 Penutup Atap Genteng Karangpilang
V PEKERJAAN MEKANIKAL ELEKTRIKAL
PEKERJAAN ELEKTRIKAL
1 Saklar Tunggal
2 Saklar Ganda
3 Pemasangan Titik Stop Kontak 200 W
4 Box MCB 6 port
5 MCB 1 phasa 6 A ex. Merlin Gerlin / setara
6 Instalasi Titik Lampu Gedung
7 Dari Panel Indul Kabel NYY 4x4 mm
8 LED 5 W
9 LED 7 W

C PEKERJAAN PENUNJANG TAMBAHAN


C1PEKERJAAN SEPTICTANK
IPEKERJAAN TANAH
1 Galian Tanah Untuk Septic Tank 2.8
2 Urugan Pasir Padat Tb 10 cm 2.8
3 Lantai Kerja 1:3:5 tbl.5 cm 2.8
4 Pengangkutan Tanah Keluar Lokasi
5 Urugan tanah kembali
IIPEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Plat Lantai 10 cm beton fc' 20,75 2.8
2 Plat Dinding 10 cm beton fc' 20,75 Dinding Luar 2.8
Dinding Sekat
3 Plat Atas 10 cm beton fc' 20,75 2.8
PEKERJAAN PIPA DRAINASE
1 Pipa PVC 4" jenis AW 21.33
2 Pipa PVC 3" jenis AW 149.21
PEKERJAAN AIR BERSIH
1 Pipa PVC 3/4" jenis AW 79.4
2 Pipa PVC 1/2" jenis AW 6
C2 PEKERJAAN SUMUR RESAPAN
I PEKERJAAN TANAH
1 Galian Tanah Untuk Sumur Resapan 2.1
2 Urugan Pasir Padat Tb 10 cm
3 Lantai Kerja 1:3:5 tbl.5 cm
4 Pengangkutan Tanah Keluar Lokasi
5 Urugan tanah kembali
II PEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Plat Tutup 10 cm beton fc' 20,75
PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan batu bata 1:5 4.082
2 Pasangan batu bata trasraam 1:3 4.082
3 Lapisan Kerikil Samping 5.652
Bawah
4 Lapisan Ijuk 6.908
C3 PEKERJAAN TANDON AIR
I PEKERJAAN TANAH
1 Galian Tanah Untuk Tandon Air 2.16
2 Urugan Pasir Padat Tb 10 cm 2.16
3 Lantai Kerja 1:3:5 tbl.5 cm 2.16
4 Pengangkutan Tanah Keluar Lokasi
5 Urugan tanah kembali
II PEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Plat Lantai 8 cm beton fc' 20,75 2.16
2 Plat Dinding 8 cm beton fc' 20,75 2.16
3 Plat Atas 8 cm beton fc' 20,75 2.16
PEKERJAAN LANTAI
1 Keramik Lantai 30x30 cm (Unpolished) 2
2 Keramik Dinding 30x30 cm (Unpolished) 1.2
2
C4PEKERJAAN BAK KONTROL
IPEKERJAAN TANAH
1 Galian Tanah Untuk Bak Kontrol 0.6
2 Urugan Pasir Padat Tb 10 cm 0.6
3 Lantai Kerja 1:3:5 tbl.5 cm 0.6
4 Pengangkutan Tanah Keluar Lokasi
5 Urugan tanah kembali
IIPEKERJAAN STRUKTUR
PEKERJAAN BETON
1 Plat Tutup 7 cm beton fc' 18,68 0.4
PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan batu bata trasraam 1:3 1.6
2 Plesteran Tras Raam 1:3
3 Acian dinding
Volume
Lebar Tebal Tinggi Buah Luas Volume Satuan
Total

547.82 547.82 m2
14 14 Titik
547.82 547.82 m2
547.82 547.82 m2
0.15 4 70.0 92.5 m3
0.15 547.82 82.173
0.1 257.15 25.715

1.15 6 10.847 65.08218 47.98889


1.15 6 6.693 40.15938
1.15 6 11.539 69.23598
1 1 2.325 2.325
0.3 0.6 10.179
0.2 0.4 2.424
0.15 0.2 2.55

1.16 6 10.847 65.08218 197.3218 m3


1.16 6 6.693 40.15938
1.16 6 11.539 69.23598
1 1 2.325 2.325
0.3 0.75 12.72375
0.2 0.55 3.333
0.15 0.35 4.4625
0.1 6 5.76 3.456 12.599 m3
0.1 6 2.88 1.728
0.1 6 6.24 3.744
0.1 1 0.93 0.093
0.3 0.1 1.6965
0.2 0.1 0.606
0.15 0.1 1.275
0.05 6 5.76 1.728 6.299 m3
0.05 6 2.88 0.864
0.05 6 6.24 1.872
0.05 1 0.93 0.047
0.3 0.05 0.84825
0.2 0.05 0.303
0.15 0.05 0.638
149.333 149.333 m3
54 378 m1
0.1 6.12 6.12 m2

54 0.126 47.4768 47.4768 m3


2.4 0.4 6 13.824 13.824 m3
1.2 0.4 6 6.912 6.912 m3
2.4 0.4 6 13.824 13.824 m3
1.185 0.3 1 0.2133 0.2133 m3
0.3 0.6 15.66 15.66 m3 CEK
0.2 0.4 5.4 5.4 m3
0.15 0.2 2.679 2.679 m3
0.4 4 18 11.52 11.52 m3 CEK
0.15 4 41 3.69 3.69 m3

4 729.100 672.744 m2

2 9.701
4 10.114
1 4.850
5 13.312
2 3.379
2 15.000
4 119.400 107.706 m2

5 10.062
5 1.632
2 1345.488 1345.488 m2
2 215.412 215.412 m2

2 64.600 129.200
1431.700 m2
0.4 4 18 72 18.18 m2
0.15 4 41 49.2
4 18 288 123.5775 m1
2 535.85

0.15 408 61.2 61.2 m3


0.1 408 40.8 40.8 m3
0.05 408 20.4 20.4 m3
216.6 287.33 m2

70.73 m2
15.08 15.08063 m2
2 64.6 64.6 m2

4 166.7 166.7 m2
68.85188 68.85188 m2
230.77 230.77 m2
4 888.6 888.6 m2

2 2 unit
4 4 unit
5 5 unit
1 1 unit
4 4 unit
2 2 unit
2.5 2 7.5 7.5 m2
5 5 unit

68.85188 68.85188 m2
75.45 m'

5 5 buah
11 11 buah
20 20 titik
1 1 buah
6 6 buah
48 48 titik
75 75 m'
28 28 buah
20 20 buah

0.3 0.6 15.579 15.579 m3


0.2 0.4 10.82 10.82 m3
0.15 0.4 1.1655 1.1655 m3
0.3 0.5 4.5 4.5 m3
0.12 403.8 48.456 48.456 m3
1.2 0.12 0.9072 1.2456 m3
1.2 0.12 0.3384
0.4 4 14 8.96 8.96 m3 CEK
0.15 4 28 2.52 2.52 m3
0.3 0.6 12.06 12.06 m3
0.2 0.4 1.408 1.408 m3
0.15 0.2 1.014 1.014 m3
Koef
0.5 19 14 133 133 kg
4243.035 kg
8 14 1357.44 1357.44 kg 6050.855
1 14 88.9 88.9 kg 302.5427
2 14 228.48 228.48 kg
152 7850 68.15558 68.15558 kg
65 7850 6.63325 6.63325 kg
4.96 2091.632 2091.632 kg
0.888 70.43616 70.43616 kg
1.58 331.3576 331.3576 kg
460 460 460 buah
88 88 88 buah

4 312.000 255.499 m2

1 4.850
1 4.850
9 46.800
4 114.160 104.805 m2

4 8.050
2 4.541
4 1.306
2 510.998 510.998 m2
2 209.610 209.610 m2

2 64.600 129.200
591.408 m2
0.4 4 14 56 13.44 m2
0.15 4 28 33.6
4 14 224 113.9775 m1
2 535.85

0.05 304.7 15.235 15.235 m3


271.71 271.71 m2

17.97 17.97 m2
2 64.6 64.6 m2

4 341.2 341.2 m2
292 292 m2
4 522.6 522.6 m2

1 1 unit
4 4 unit
1 1 unit
2.6 9 46.8 46.8 m2
4 4 unit

292 292 m2
268 m'

405.75 405.75 m2

2 2 buah
8 8 buah
9 9 titik
1 1 buah
6 6 buah
43 43 titik
75 75 m'
12 12 buah
44 44 buah

1.55 5.145 14.405 14.405 m3


1.2 0.1 0.336 0.336 m3
1.2 0.05 0.168 0.168 m3
14.405 10.804 m3
3.601 3.601 m3

1.2 0.1 0.336 0.336 m3


1.2 0.1 1.2 8 0.96 1.176 m3
1.2 0.1 0.9 2 0.216
1.2 0.1 0.336 0.336 m3

21.33 m'
149.21 m'

79.4 m'
6 m'
2.1 2.2 9.702 9.702 m3
0.1 3.462 0.346 0.346 m3
0.05 3.462 0.173 0.173 m3
9.702 7.277 m3
2.426 2.426 m3

0.1 1.130 0.113 0.113 m3

1.5 6.123 m2
1.1 4.490 m2
0.2 2 2.261 2.361 m3
0.2 0.502 0.100
2 13.816 13.816 m2

1.83 7.629 16.478 16.478 m3


1.36 0.1 0.294 0.294 m3
1.36 0.05 0.147 0.147 m3
16.478 12.359 m3
4.120 4.120 m3

1.36 0.08 0.235 0.235 m3


1.36 0.08 2 7.04 1.126 1.126 m3
1.36 0.08 0.235 0.235 m3

1.36 2 2.72 2.72 m2


1.36 2 2 4.8 10.24 m2
1.36 2 2 5.44

0.6 0.6 0.216 0.216 m3


0.6 0.1 0.036 0.036 m3
0.6 0.05 0.018 0.018 m3
0.216 0.162 m3
0.054 0.054 m3

0.4 0.07 0.011 0.011 m3

0.6 0.960 0.960 m2


2 1.920 m2
1.920 m2
RENCANA ANGGARAN BIAYA (RAB)

NAMA KEGIATAN : PERENCANAAN FASILITAS GEDUNG KELURAHAN


PEKERJAAN : PEMBANGUNAN GEDUNG KELURAHAN SIDOTOPO
LOKASI : JL. SIDOTOPO WETAN
TAHUN : 2015

Harga Satuan Jumlah Harga


Total Harga
No Uraian Pekerjaan Satuan Volume
(Rp)
(Rp) (Rp)
1 2 3 4 5 6 7

A. PEKERJAAN PENDAHULUAN
1 Uitzet Dengan WaterPass / Theodolit m2 547.82 4,452.37 2,439,098.70
2 Pengukuran dan Pemasangan Bowplank (UITZET) Titik 14.00 104,876.50 1,468,271.00
3 Pembongkaran bangunan existing dan Pembersihan Lokasi Ls. 547.82 m2 ls 1.00 7,228,180.56 7,228,180.56
5 Pembuangan bongkaran bangunan existing dan sisa galian ls 1.00 2,466,989.81 2,466,989.81
Sub Total 13,602,540.07
Total 13,602,540.07
B. PEKERJAAN GEDUNG
B.1. PEKERJAAN LANTAI 1 Elv. +0.00
I. PEKERJAAN TANAH
1 Galian tanah untuk konstruksi m3 197.32 113,744.00 22,444,169.68
2 Urugan pasir padat dibawah Pilecap tebal 10 cm m3 12.60 184,170.00 2,320,265.75
3 Lantai Kerja K-175 Tbl. 5cm m3 6.30 930,030.42 5,858,494.15
4 Urugan Tanah Kembali m3 149.33 13,443.00 2,007,482.24
Sub Total 32,630,411.82
Total 32,630,411.82
II. PEKERJAAN PONDASI
1 Pembuatan Lubang Strouss Pile diameter 40 cm m' 378.00 135,477.33 51,210,432.00
2 Pondasi Rollag Bata 1:3 m2 6.12 121,660.00 744,559.20
Sub Total 51,954,991.20
Total 51,954,991.20
III. PEKERJAAN STRUKTUR
1 PEKERJAAN BETON
1 Beton Strouss Pile diameter 40 cm ; Depth. 10 ; f'c 20,75 Mpa; K-250 m3 47.48 2,546,457.87 120,897,671.19
2 Pilecap P1 2400x2400x40 cm beton fc' 20,75 Mpa; K-250 m3 13.82 2,486,222.71 34,369,542.74
3 Pilecap P2 2400x1200x40 cm beton fc' 20,75 Mpa; K-250 m3 6.91 2,742,168.05 18,953,865.53
4 Pilecap P3 2400x2400x40 cm beton fc' 20,75 Mpa; K-250 m3 13.82 2,475,586.35 34,222,505.68
6 Pilecap PT 600x1550x30 cm beton fc' 20,75 Mpa; K-250 m3 0.21 3,128,429.45 667,294.00
7 Sloof S1 (25x50) beton fc' 20,75 Mpa; K-250 m3 15.66 3,903,552.37 61,129,630.12
8 Sloof S2 (20x35) beton fc' 20,75 Mpa; K-250 m3 5.40 3,461,731.25 18,693,348.73
9 Sloof S3 (15x30) beton fc' 20,75 Mpa; K-250 m3 2.68 4,312,723.84 11,553,787.18
10 Kolom K1 (40x40) beton fc' 20,75 Mpa; K-250 m3 11.52 5,402,278.29 62,234,245.85
12 Kolom KP (15x15) beton fc' 18,68 Mpa; K-225 m3 3.69 5,612,823.02 20,711,316.93
Sub Total 383,433,207.95
Total 383,433,207.95
IV. PEKERJAAN ARSITEKTUR
1 PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan dinding batu bata 1:5 m2 672.74 115,100.60 77,433,238.05
2 Pasangan Batu Bata Trasraam 1:3 m2 107.71 121,010.40 13,033,546.14
3 Plesteran dinding halus 1:5 m2 1,345.49 64,616.28 86,940,429.34
4 Plesteran Tras Raam 1:3 m2 215.41 65,665.80 14,145,201.31
5 Acian dinding m2 1,431.70 40,185.00 57,532,864.50
6 Acian beton 15 % m2 18.18 40,185.00 730,563.30
7 Benangan beton 15 % m1 123.58 21,028.00 2,598,587.67
Sub Total 252,414,430.31
2 PEKERJAAN LANTAI
1 Urugan Sirtu padat m3 61.20 169,745.00 10,388,394.00
2 Urugan Pasir padat m3 40.80 184,170.00 7,514,136.00
3 Lantai Kerja K-175 Tbl. 5cm m3 20.40 930,030.42 18,972,620.66
4 Keramik Lantai dan teras 40x40 cm (Polished) m2 287.33 239,281.00 68,752,609.73
5 Keramik Lantai Kamar Mandi 40x40 cm (Unpolished) m2 15.08 233,977.00 3,528,519.40
6 Keramik Dinding Kamar Mandi 20x40 cm (Unpolished) m2 64.60 267,058.00 17,251,946.80
Sub Total 126,408,226.58
3 PEKERJAAN PENGECATAN
1 Cat Dinding Exterior m2 166.70 37,017.00 6,170,733.90
2 Cat Plafond Expose m2 68.85 25,440.50 1,751,626.13
3 Cat Dinding Interior m2 888.60 25,440.50 22,606,428.30
Sub Total 30,528,788.33
4 PEKERJAAN KUSEN
1 Pintu Type P1 unit 2.00 5,024,145.44 10,048,290.89
2 Pintu Type P2 unit 4.00 2,706,974.18 10,827,896.74
3 Pintu Type P3 unit 5.00 2,922,521.15 14,612,605.77
4 Pintu Type P5 unit 1.00 4,034,208.72 4,034,208.72
5 Jendela Type J1 unit 4.00 4,103,313.35 16,413,253.39
6 Jendela Type J2 unit 2.00 4,034,208.72 8,068,417.45
7 Jendela Type J3 m2 7.50 487,650.60 3,657,379.50
8 Jendela Type BV unit 5.00 291,529.05 1,457,645.27
Sub Total 69,119,697.73
5 PEKERJAAN PLAFOND
1 Plafond Kalsiboard 4,5 mm (Rangka Metal Furing) m2 68.85 163,637.50 11,266,748.70
2 List Plafond Kalsiboard uk.5/5 m' 75.45 40,451.00 3,052,027.95
Sub Total 14,318,776.65
Total 876,223,127.54
V. PEKERJAAN MEKANIKAL & ELEKTRIKAL
1 PEKERJAAN ELEKTRIKAL
1 Saklar Tunggal buah 5.00 57,660.00 288,300.00
2 Saklar Ganda buah 11.00 73,760.00 811,360.00
3 Pemasangan Titik Stop Kontak titik 20.00 207,860.00 4,157,200.00
4 Box MCB 8 port buah 1.00 150,000.00 150,000.00
5 MCB 1 phasa 6 A buah 6.00 81,400.00 488,400.00
6 Instalasi Titik Lampu Gedung titik 48.00 312,500.00 15,000,000.00
7 Dari Panel Indul Kabel NYY 4x4 mm m' 75.00 20,200.00 1,515,000.00
8 LED 5 W buah 28.00 70,000.00 1,960,000.00
9 LED 7 W buah 20.00 85,000.00 1,700,000.00
Sub Total 26,070,260.00
Total Lantai 1 1,370,311,998.51
B.2. PEKERJAAN LANTAI 2 Elv. +4.00
I. PEKERJAAN STRUKTUR
1 PEKERJAAN BETON
1 Balok B1 (30x60) beton fc' 20,75 Mpa; K-250 m3 15.58 4,027,492.44 62,744,304.71
3 Balok B2 (20x40) beton fc' 20,75 Mpa; K-250 m3 10.82 4,493,010.13 48,614,369.58
4 Balok B3 (15/40) beton fc' 20,75 Mpa; K-250 m3 1.17 5,457,720.04 6,360,972.71
5 Balok BK (30x60)-(30x40) Beton fc' 20,75 Mpa; K-250 m3 4.50 3,860,813.22 17,373,659.50
6 Plat Lantai 12 cm beton fc' 20,75 Mpa; K-250 m3 48.46 3,293,778.49 159,603,330.71
7 Beton Tangga 12 cm beton fc' 20,75 Mpa; K-250 m3 1.25 3,293,778.49 4,102,730.49
Sub Total 298,799,367.70
Total 298,799,367.70
C. PEKERJAAN PENUNJANG TAMBAHAN
C.1 PEKERJAAN SEPTIC TANK
I. PEKERJAAN TANAH
1 Galian Tanah Untuk Konstruksi Septic Tank m3 14.41 113,744.00 1,638,519.63
2 Urugan Pasir Padat Tb 5cm m3 0.34 184,170.00 61,881.12
3 Lantai Kerja K-175 Tbl. 5cm m3 0.17 930,030.42 156,245.11
4 Pengangkutan Tanah Keluar Lokasi ls 1.00 500,000.00 500,000.00
5 Urugan tanah kembali m3 3.60 13,443.00 48,412.71
Sub Total 2,405,058.57
II. PEKERJAAN BETON SEPTICTANK
1 Plat Lantai 10 cm beton fc' 20,75 Mpa; K-250 m3 0.34 4,129,758.95 1,387,599.01
2 Plat Dinding 10 cm beton fc' 20,75 Mpa; K-250 m3 1.18 4,129,758.95 4,856,596.53
3 Plat Atas 10 cm beton fc' 20,75 Mpa; K-250 m3 0.34 4,129,758.95 1,387,599.01
Sub Total 7,631,794.54
III. PEKERJAAN PIPA DRAINASE
1 Pipa PVC 4" jenis AW m' 21.33 75,980.00 1,620,653.40
2 Pipa PVC 3" jenis AW m' 149.21 52,130.00 7,778,317.30
3 Pipa PVC 2" jenis AW m' 79.40 28,470.00 2,260,518.00
Sub Total 11,659,488.70
Total 21,696,341.81
C.2 PEKERJAAN SUMUR RESAPAN
I. PEKERJAAN TANAH
1 Galian Tanah Untuk Konstruksi Sumur Resapan m3 9.70 113,744.00 1,103,544.29
2 Urugan Pasir Padat Tb 5cm m3 0.35 184,170.00 63,756.89
3 Lantai Kerja K-175 Tbl. 5cm m3 0.17 930,030.42 160,981.29
4 Pengangkutan Tanah Keluar Lokasi ls 1.00 500,000.00 500,000.00
5 Urugan tanah kembali m3 2.43 13,443.00 32,606.00
Sub Total 1,860,888.47
II. PEKERJAAN BETON SUMUR RESAPAN
1 Plat Tutup 10 cm beton fc' 20,75 m3 0.11 4,129,758.95 466,827.95
Sub Total 466,827.95
III. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Batu Bata 1:5 m2 6.12 115,100.60 704,760.97
2 Pasangan Batu Bata Trasraam 1:3 m2 4.49 121,010.40 543,360.90
3 Lapisan Kerikil m3 2.36 268,255.00 633,425.17
4 Lapisan Ijuk m2 13.82 183,255.00 2,531,851.08
Sub Total 4,413,398.12
Total 6,741,114.54
C.3 PEKERJAAN TANDON AIR
I. PEKERJAAN TANAH
1 Galian Tanah Untuk Konstruksi Tandon Air m3 16.48 113,744.00 1,874,322.84
2 Urugan Pasir Padat Tb 5cm m3 0.29 184,170.00 54,101.78
3 Lantai Kerja K-175 Tbl. 5cm m3 0.15 930,030.42 136,602.87
4 Pengangkutan Tanah Keluar Lokasi ls 1.00 500,000.00 500,000.00
5 Urugan tanah kembali m3 4.12 13,443.00 55,379.89
Sub Total 2,620,407.38
II. PEKERJAAN BETON TANDON AIR
1 Plat Lantai 8 cm beton fc' 20,75 Mpa; K-250 m3 0.24 5,351,412.79 1,257,624.82
2 Plat Dinding 8 cm beton fc' 20,75 Mpa; K-250 m3 1.13 5,351,412.79 6,027,831.37
3 Plat Atas 8 cm beton fc' 20,75 Mpa; K-250 m3 0.24 5,351,412.79 1,257,624.82
Sub Total 8,543,081.00
III. PEKERJAAN LANTAI
1 Keramik Lantai 30x30 cm (Unpolished) m2 2.72 232,996.35 633,750.06
2 Keramik Dinding 30x30 cm (Unpolished) m2 10.24 234,060.28 2,396,777.22
Sub Total 3,030,527.27
Total 14,194,015.66
C.4 PEKERJAAN BAK KONTROL
I. PEKERJAAN TANAH
1 Galian Tanah Untuk Konstruksi Bak Kontrol m3 0.22 113,744.00 24,568.70
2 Urugan Pasir Padat Tb 5cm m3 0.04 184,170.00 6,630.12
3 Lantai Kerja K-175 Tbl. 5cm m3 0.02 930,030.42 16,740.55
4 Pengangkutan Tanah Keluar Lokasi ls 1.00 500,000.00 500,000.00
5 Urugan tanah kembali m3 0.05 13,443.00 725.92
Sub Total 548,665.29
II. PEKERJAAN BETON BAK KONTROL
1 Plat Tutup 7 cm beton fc' 18.68 Mpa m3 0.01 4,664,774.66 52,245.48
Sub Total 52,245.48
III. PEKERJAAN PASANGAN & PLESTERAN
1 Pasangan Batu Bata Trasraam 1:3 m2 0.96 121,010.40 116,169.98
2 Plesteran Tras Raam 1:3 m2 1.92 65,665.80 126,078.34
3 Acian dinding m2 1.92 40,185.00 77,155.20
Sub Total 319,403.52
Total 4,601,571.45
C.4 PEKERJAAN ALAT TAMBAHAN
1 Tandon air Roof Tank Stainlees Steal buah 2.00 4,500,000.00 9,000,000.00 9,000,000.00
2 Pompa Air Transfer buah 1.00 3,000,000.00 3,000,000.00 3,000,000.00
3 Booster pump package buah 1.00 3,200,000.00 3,200,000.00 3,200,000.00
Sub Total 15,200,000.00
Total 15,200,000.00
REKAPITULASI

NAMA KEGIATAN : PERENCANAAN FASILITAS GEDUNG KELURAHAN


PEKERJAAN : PEMBANGUNAN GEDUNG KELURAHAN SIDOTOPO
LOKASI : JL. SIDOTOPO WETAN
TAHUN : 2015

No JENIS PEKERJAAN JUMLAH HARGA

A. PEKERJAAN PENDAHULUAN Rp. 13,602,540.07

B. PEKERJAAN GEDUNG
PEKERJAAN LANTAI 1 Elv. +0.00 Rp. 1,370,311,998.51

PEKERJAAN LANTAI 2 Elv. +4.00 Rp. 298,799,367.70

c PEKERJAAN PENUNJANG TAMBAHAN


PEKERJAAN SEPTIC TANK Rp. 21,696,341.81

PEKERJAAN SUMUR RESAPAN Rp. 6,741,114.54

PEKERJAAN TANDON AIR Rp. 14,194,015.66

PEKERJAAN BAK KONTROL Rp. 4,601,571.45

PEKERJAAN ALAT TAMBAHAN Rp. 15,200,000.00

Jumlah Rp. 1,745,146,949.73


PPn 10 % Rp. 174,514,694.97
Total Rp. 1,919,661,644.71
Total Dibulatkan Rp. 1,919,661,000.00
Terbilang :
Satu Milyar Sembilan Ratus Sembilan Belas Juta Enam Ratus Enam Puluh Satu Ribu Rupiah