BIAYA SATUAN
No. TENAGA KERJA SATUAN BIAYA SATUAN (Rp)
(Rp)
1 Mandor Hari 176,000.00 22,000.00
2 Pekerja Hari 113,000.00 14,125.00
3 Tukang Hari 141,000.00 17,625.00
4 Operator Hari 178,000.00 22,250.00
5 Pembantu Operator Hari 164,000.00 20,500.00
6 Supir Hari 153,000.00 19,125.00
7 Pembantu Supir Hari 117,000.00 14,625.00
8 Mekanik Hari 150,000.00 18,750.00
9 Pembantu Mekanik Hari 141,000.00 17,625.00