14 1.00 m2 Sponengan
B Pekerjaan Persiapan
1 Galian Tanah m3 0.25 73,562.50 18,390.63
2 Galian Aspal dan Beton ls 1.00 400,000.00 400,000.00
3 Pembesihan Lahan ls 1.00 300,000.00 300,000.00
4 Bongkar Dinding Lt2 m2 0.41 627,902.00 254,300.31
972,690.94
C Pekerjaan Pasangan
1 Pasang Pintu Lama ls 1.00 500,000.00 500,000.00
2 Plesteran m2 0.72 71,351.50 51,373.08
3 Acian m2 0.72 39,173.75 28,205.10
579,578.18
C Pekerjaan Besi
1 Pasang Tempat Tandon Air 2000 Liter kg 107.00 33,143.00 3,546,301.00
2 Pengelasan m' 4.10 238,304.00 977,046.40
3 Tandon Air 2000 Liter buah 1.00 3,500,000.00 3,500,000.00
4 Pengecatan Besi m2 17.00 34,454.75 585,730.75
8,609,078.15
D Pekerjaan Pemiapaan
1 Pasang Pipa PVC 2' m' 76.00 38,520.17 2,927,532.67
2 Pasang Pipa PVC 0,5'' m' 104.00 24,354.00 2,532,816.00
3 Pasang Pipa PVC 3/4'' m' 16.00 26,911.50 430,584.00
4 Keni 2'' buah 20.00 7,500.00 150,000.00
5 Keni 0,5'' buah 26.00 7,500.00 195,000.00
6 Stop Kran buah 12.00 10,000.00 120,000.00
7 Sockdrat buah 28.00 7,500.00 210,000.00
8 Pompa Air buah 1.00 585,000.00 585,000.00
9 Otomatis Pompa Air buah 1.00 150,000.00 150,000.00
7,300,932.67
Jumlah 17,962,279.93
PPN 10% 1,796,227.99
Aanemingsom 19,758,507.92
Dibulatkan 19,758,000.00
Terbilang :
cat tembok 18
3.776
22.5
44.276
Plesteran 2.421