DAFTAR HARGA SATUAN UPAH DAN BAHAN

TAHUN ANGGARAN 2021

NO URAIAN SATUAN HARGA SATUAN (Rp.) KET

1 2 3 4 5
I UPAH
1 Pekerja Hari 110,000.00
2 Mandor Hari 145,000.00
3 Kepala Tukang Hari 145,000.00
4 Tukang Kayu Hari 130,000.00
5 Tukang Batu Hari 130,000.00
6 Tukang Cat Hari 130,000.00
8 Tukang Besi Hari 130,000.00

II BAHAN
A BAHAN BATU KALI BELAH / BATU PECAH
1 Batu Belah 15/20 / Batu Gunung M3 140,000.00

B BAHAN KERIKIL / KORAL


1 Kerikil Beton M3 158,000.00
2 Split (Batu pecah 0,5-1 cm/mesin) M3 253,000.00

C BAHAN PASIR
1 Pasir Pasang M3 160,150.00
2 Pasir Beton M3 165,000.00
4 Cadas M3 52,400.00
6 Sirtu M3 123,300.00

E BAHAN SEMEN
2 Semen Portland (PCC) Kg 1,290.00

F BAHAN KAYU
1 Kayu Papan Klas III M3 2,200,000.00 62.50
2 Kayu Balok Klas III M3 2,200,000.00
3 Kayu Papan Klas IV M3 1,900,000.00
4 Kayu Bekisting M3 1,900,000.00
5 Dolken Kayu Galam dia. 8-10/4 m Btg 12,930.00

G BAHAN PAKU
1 Paku Biasa 1/2"-5" Kg 20,000.00
2 Paku Triplek Kg 21,000.00

H BAHAN PIPA

I BAHAN PLAFOND
2 Multiplek Tebal 9 mm Lbr 125,500.00

J BAHAN BESI DAN ALLUMINIUM


1 Kawat Beton Kg 20,000.00
2 Besi Beton Polos Kg 12,500.00
3 Floordeck t=7 mm p=6 m, l= 1 m Kg 850,000.00

P BAHAN MINYAK DAN PELUMAS


4 Air Ltr 12.50
20 Minyak Bekisting Kg 2,500.00

R BAHAN BUIS BETON (GORONG-GORONG BETON)


4 DIA 40 cm Bh 130,000.00

S BETON READY MIX


1 Beton Ready Mix K-225 M3 1,310,000.00

III PERALATAN
9 Sewa Concrete Mixer / Molen Hari 200,000.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KOTA SOLOK
TAHUN ANGGARAN 2021

No URAIAN H. SATUAN UPAH BAHAN JUMLAH


a b c d e f
I PEKERJAAN PERSIAPAN

1 1 M2 PEMBERSIHAN DAN STRIPING/KOSREKAN


0.0600 Pekerja Rp. 110,000.00 Rp. 6,600.00
0.0060 Mandor Rp. 145,000.00 Rp. 870.00
Rp. 7,470.00 Rp. 7,470.00
Overhead 10% Rp. 747.00
Jumlah Rp. 8,217.00
Dibulatkan Rp. 8,217.00

4 1 M' PENGUKURAN DAN PEMASANGAN BOUWPLANK


0.1000 Pekerja Rp. 110,000.00 Rp. 11,000.00
0.1000 Tukang Kayu Rp. 130,000.00 Rp. 13,000.00
0.0100 Kepala Tukang Rp. 145,000.00 Rp. 1,450.00
0.0050 Mandor Rp. 145,000.00 Rp. 725.00

0.0070 M3 Kayu Papan 3/20 Rp. 1,900,000.00 Rp. 13,300.00


0.0120 M3 Kayu 5/7 / Kayu Pancang Rp. 1,880,000.00 Rp. 22,560.00
0.0200 Kg Paku Biasa (2" - 5") Rp. 20,000.00 Rp. 400.00
Rp. 26,175.00 Rp. 36,260.00 Rp. 62,435.00
Overhead 10% Rp. 6,243.50
Jumlah Rp. 68,678.50
Dibulatkan Rp. 68,678.00

II PEKERJAAN TANAH

1 1 M3 PENGGALIAN TANAH BIASA SEDALAM 1 METER


0.7500 Pekerja Rp. 110,000.00 Rp. 82,500.00
0.0250 Mandor Rp. 145,000.00 Rp. 3,625.00
Rp. 86,125.00 Rp. 86,125.00
Overhead 10% Rp. 8,612.50
Jumlah Rp. 94,737.50
Dibulatkan Rp. 94,737.00

8 1 M3 PEMBUANGAN TANAH SEJAUH 30 METER


0.3300 Pekerja Rp. 110,000.00 Rp. 36,300.00
0.0100 Mandor Rp. 145,000.00 Rp. 1,450.00
Rp. 37,750.00 Rp. 37,750.00
Overhead 10% Rp. 3,775.00
Jumlah Rp. 41,525.00
Dibulatkan Rp. 41,525.00

11 1 M3 PENGURUNGAN DENGAN PASIR URUG


0.3000 Pekerja Rp. 110,000.00 Rp. 33,000.00
0.0100 Mandor Rp. 145,000.00 Rp. 1,450.00

1.2000 M3 Pasir Urug Rp. 137,100.00 Rp. 164,520.00


Rp. 34,450.00 Rp. 164,520.00 Rp. 198,970.00
Overhead 10% Rp. 19,897.00
Jumlah Rp. 218,867.00
Dibulatkan Rp. 218,867.00

13 1 M3 PENGURUGAN SIRTU PADAT


0.2500 Pekerja Rp. 110,000.00 Rp. 27,500.00
0.0250 Mandor Rp. 145,000.00 Rp. 3,625.00

1.2000 M3 Sirtu Rp. 123,300.00 Rp. 147,960.00


Rp. 31,125.00 Rp. 147,960.00 Rp. 179,085.00
Overhead 10% Rp. 17,908.50
Jumlah Rp. 196,993.50
Dibulatkan Rp. 196,993.00
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
14 1 M3 PENGURUGAN CADAS PADAT
0.3000 Pekerja Rp. 110,000.00 Rp. 33,000.00
0.0100 Mandor Rp. 145,000.00 Rp. 1,450.00

1.2000 M3 Cadas Rp. 52,400.00 Rp. 62,880.00


Rp. 34,450.00 Rp. 62,880.00 Rp. 97,330.00
Overhead 10% Rp. 9,733.00
Jumlah Rp. 107,063.00
Dibulatkan Rp. 107,063.00

III PEKERJAAN PONDASI

2 1 M3 PEMASANGAN PONDASI BATU BELAH, CAMPURAN 1 PC : 4 PP


1.5000 Pekerja Rp. 110,000.00 Rp. 165,000.00
0.7500 Tukang Batu Rp. 130,000.00 Rp. 97,500.00
0.0750 Kepala Tukang Rp. 145,000.00 Rp. 10,875.00
0.0750 Mandor Rp. 145,000.00 Rp. 10,875.00

1.2000 M3 Batu Belah 15 cm/20 cm Rp. 140,000.00 Rp. 168,000.00


0.5200 M3 Pasir Pasang Rp. 160,150.00 Rp. 83,278.00
163.0000 Kg Semen Portland (PCC) Rp. 1,290.00 Rp. 210,270.00
Rp. 284,250.00 Rp. 461,548.00 Rp. 745,798.00
Overhead 10% Rp. 74,579.80
Jumlah Rp. 820,377.80
Dibulatkan Rp. 820,377.00

V PEKERJAAN PLESTERAN
4 1 M2 PEMASANGAN PLESTERAN 1 PC : 4 PP, TEBAL 15 mm
6.2400 Kg Semen Portland (PCC) Rp. 1,290.00 Rp. 8,049.60
0.0240 M3 Pasir Pasang Rp. 160,150.00 Rp. 3,843.60

0.3000 Pekerja Rp. 110,000.00 Rp. 33,000.00


0.1500 Tukang Batu Rp. 130,000.00 Rp. 19,500.00
0.0150 Kepala Tukang Rp. 145,000.00 Rp. 2,175.00
0.0150 Mandor Rp. 145,000.00 Rp. 2,175.00
Rp. 56,850.00 Rp. 11,893.20 Rp. 68,743.20
Overhead 10% Rp. 6,874.32
Jumlah Rp. 75,617.52
Dibulatkan Rp. 75,617.00

18 1 M2 PEMASANGAN ACIAN
3.2500 Kg Semen Portland (PCC) Rp. 1,290.00 Rp. 4,192.50

0.2000 Pekerja Rp. 110,000.00 Rp. 22,000.00


0.1000 Tukang Batu Rp. 130,000.00 Rp. 13,000.00
0.0100 Kepala Tukang Rp. 145,000.00 Rp. 1,450.00
0.0100 Mandor Rp. 145,000.00 Rp. 1,450.00
Rp. 37,900.00 Rp. 4,192.50 Rp. 42,092.50
Overhead 10% Rp. 4,209.25
Jumlah Rp. 46,301.75
Dibulatkan Rp. 46,301.00

VII PEKERJAAN BETON

7 1 M3 MEMBUAT BETON MUTU fc' = 19,3 MPa


371.0000 Kg Semen Portland (PCC) Rp. 1,290.00 Rp. 478,590.00
0.4986 M3 Pasir Beton Rp. 165,000.00 Rp. 82,264.29
0.7756 M3 Split (10-20 mm) Rp. 253,000.00 Rp. 196,215.56
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 759,757.34 Rp. 993,102.34
Overhead 10% Rp. 99,310.23
Jumlah Rp. 1,092,412.58
Dibulatkan Rp. 1,092,412.00
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
13 1 M3 BETON MENGGUNAKAN READY MIXED K-225
1.0200 M3 Campuran Beton Ready Mixed K-225 Rp. 1,310,000.00 Rp. 1,336,200.00

1.0000 Pekerja Rp. 110,000.00 Rp. 110,000.00


0.2500 Tukang Batu Rp. 130,000.00 Rp. 32,500.00
0.0250 Kepala Tukang Rp. 145,000.00 Rp. 3,625.00
0.1000 Mandor Rp. 145,000.00 Rp. 14,500.00
Rp. 160,625.00 Rp. 1,336,200.00 Rp. 1,496,825.00
Overhead 10% Rp. 149,682.50
Jumlah Rp. 1,646,507.50
Dibulatkan Rp. 1,646,507.00

14 1 Kg PEMBESIAN DENGAN BESI POLOS ATAU BESI ULIR


1.0500 Kg Besi Beton (polos/ulir) Rp. 12,500.00 Rp. 13,125.00
0.0150 Kg Kawat Beton Rp. 20,000.00 Rp. 300.00

0.0070 Pekerja Rp. 110,000.00 Rp. 770.00


0.0070 Tukang Besi Rp. 130,000.00 Rp. 910.00
0.0007 Kepala Tukang Rp. 145,000.00 Rp. 101.50
0.0004 Mandor Rp. 145,000.00 Rp. 58.00
Rp. 1,839.50 Rp. 13,425.00 Rp. 15,264.50
Overhead 10% Rp. 1,526.45
Jumlah Rp. 16,790.95
Dibulatkan Rp. 16,790.00

17 1 M2 PEMASANGAN BEKISTING UNTUK PONDASI


0.0400 M3 Kayu Klas III Rp. 2,200,000.00 Rp. 88,000.00
0.3000 Kg Paku 5 cm - 10 cm Rp. 20,000.00 Rp. 6,000.00
0.1000 Lt Minyak Bekisting Rp. 2,500.00 Rp. 250.00

0.5200 Pekerja Rp. 110,000.00 Rp. 57,200.00


0.2600 Tukang Kayu Rp. 130,000.00 Rp. 33,800.00
0.0260 Kepala Tukang Rp. 145,000.00 Rp. 3,770.00
0.0260 Mandor Rp. 145,000.00 Rp. 3,770.00
Rp. 98,540.00 Rp. 94,250.00
Untuk 2x Pemakaian Bahan Rp. 98,540.00 Rp. 47,125.00 Rp. 145,665.00
Overhead 10% Rp. 14,566.50
Jumlah Rp. 160,231.50
Dibulatkan Rp. 160,231.00

18 1 M2 PEMASANGAN BEKISTING UNTUK SLOOF, KOLOM PRAKTIS, BALOK PRAKTIS, PET BETON
0.0450 M3 Kayu Klas III Rp. 2,200,000.00 Rp. 99,000.00
0.3000 Kg Paku 5 cm - 10 cm Rp. 20,000.00 Rp. 6,000.00
0.1000 Lt Minyak Bekisting Rp. 2,500.00 Rp. 250.00

0.5200 Pekerja Rp. 110,000.00 Rp. 57,200.00


0.2600 Tukang Kayu Rp. 130,000.00 Rp. 33,800.00
0.0260 Kepala Tukang Rp. 145,000.00 Rp. 3,770.00
0.0260 Mandor Rp. 145,000.00 Rp. 3,770.00
Rp. 98,540.00 Rp. 105,250.00
Untuk 2x Pemakaian Bahan Rp. 98,540.00 Rp. 52,625.00 Rp. 151,165.00
Overhead 10% Rp. 15,116.50
Jumlah Rp. 166,281.50
Dibulatkan Rp. 166,281.00

1 B.22.b 1 m2 Bekisting lantai Floordeck tipe pelat (JAP < 0,8 m)


1.0800 M2 Floordeck Rp. 141,666.67 Rp. 153,000.00

0.0400 Pekerja Rp. 110,000.00 Rp. 4,400.00


0.0200 Tukang Kayu Rp. 130,000.00 Rp. 2,600.00
0.0020 Kepala Tukang Rp. 145,000.00 Rp. 290.00
0.0040 Mandor Rp. 145,000.00 Rp. 580.00
Rp. 7,870.00 Rp. 153,000.00
Rp. 7,870.00 Rp. 153,000.00 Rp. 160,870.00
Overhead 10% Rp. 16,087.00
Jumlah Rp. 176,957.00
Dibulatkan Rp. 176,957.00
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
1 1 M3 BONGKAR BETON SECARA KONVENSIONAL
3.6000 Pekerja Rp. 110,000.00 Rp. 396,000.00
0.3600 Mandor Rp. 145,000.00 Rp. 52,200.00

1.2000 Ltr Cuka Bibit Rp. 39,000.00 Rp. 46,800.00


0.0200 Bh Palu/Godam Rp. 995,000.00 Rp. 19,900.00
0.1000 Bh Gergaji Besi Rp. 35,000.00 Rp. 3,500.00
0.0300 Bh Pahat beton (Baja Keras) Rp. 50,000.00 Rp. 1,500.00
0.0500 Bh Linggis (Baja Keras) Rp. 130,000.00 Rp. 6,500.00
Rp. 448,200.00 Rp. 78,200.00 Rp. 526,400.00
Overhead 10% Rp. 52,640.00
Jumlah Rp. 579,040.00
Dibulatkan Rp. 579,040.00

2 1 M3 BONGKAR PASANGAN BATU (MANUAL)


1.2000 Pekerja Rp. 110,000.00 Rp. 132,000.00
0.1200 Mandor Rp. 145,000.00 Rp. 17,400.00

0.0060 Bh Palu/Godam (Baja Keras) Rp. 995,000.00 Rp. 5,970.00


0.0090 Bh Pahat beton (Baja Keras) Rp. 50,000.00
0.0200 Bh Linggis (Baja Keras) Rp. 130,000.00 Rp. 2,600.00
Rp. 149,400.00 Rp. 8,570.00 Rp. 157,970.00
Overhead 10% Rp. 15,797.00
Jumlah Rp. 173,767.00
Dibulatkan Rp. 173,767.00
REKAPITULASI DAFTAR ANALISA HARGA SATUAN PEKERJAAN
DINAS PERUMAHAN DAN KAWASAN PERMUKIMAN KOTA SOLOK
TAHUN ANGGARAN 2020

NO URAIAN SATUAN HARGA SATUAN (Rp.)

1 2 3 4

A BIDANG CIPTA KARYA


I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan dan Perataan M2 8,217.00
2 Pembongkaran Beton Bertulang M3 1,719,641.00
3 Pembongkaran Dinding Tembok Bata M3 859,820.00
4 Pengukuran dan Pemasangan Bouwplank M' 68,678.00
5 Pembuatan Pagar Sementara dari Seng Gelombang Tinggi 2 m M2 340,868.00

II PEKERJAAN TANAH
1 Penggalian Tanah Biasa Sedalam 1 Meter M3 94,737.00
2 Penggalian Tanah Biasa Sedalam 2 Meter M3 116,077.00
3 Penggalian Tanah Biasa Sedalam 3 Meter M3 137,736.00
4 Penggalian Tanah Keras Sedalam 1 Meter M3 126,104.00
5 Penggalian Tanah Cadas Sedalam 1 Meter M3 191,070.00
6 Penggalian Tanah Lumpur Sedalam 1 Meter M3 152,377.00
7 Pengerjaan Stripping Tebing Setinggi 1 Meter M3 6,847.00
8 Pembuangan Tanah Sejauh 30 Meter M3 41,525.00
9 Pengurungan Kembali Galian Tanah M3 68,475.00
10 Pemadatan Tanah (Per 20 cm) M3 68,475.00
11 Pengurugan dengan Pasir Urug M3 218,867.00
12 Pengurugan Sirtu Padat M3 196,993.00
13 Pengurugan Cadas Padat M3 107,063.00

III PEKERJAAN PONDASI


1 Pemasangan Pondasi Batu Belah, Campuran 1 Pc : 3 Pp M3 869,553.00
2 Pemasangan Pondasi Batu Belah, Campuran 1 Pc : 4 Pp M3 820,377.00
3 Pemasangan Pondasi Batu Belah, Campuran 1 Pc : 5 Pp M3 786,292.00
4 Pemasangan Batu Kosong (Anstamping) M3 412,540.00
5 Pemasangan Pondasi Siklop, 60% Beton Campuran 1 Pc : 2 Pb : 3 Kr M3 1,060,794.00
6 Pemasangan Pondasi Sumuran diameter 100 cm M3 919,092.00
7 Pemasangan Cetakan Cincin Sumuran M2 255,306.00
8 Pondasi Sumuran 1,00 M (Diameter Dalam) Kedalaman 3 M Titik 4,808,439.00

IV PEKERJAAN PASANGAN DINDING


1 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Batu M2 308,194.00
Campuran Spesi 1 Pc : 2 Pp
2 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Batu M2 295,162.00
Campuran Spesi 1 Pc : 3 Pp
3 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Batu M2 286,432.00
Campuran Spesi 1 Pc : 4 Pp
4 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Batu M2 281,845.00
Campuran Spesi 1 Pc : 5 Pp
5 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1 Batu M2 280,118.00
Campuran Spesi 1 Pc : 6 Pp
6 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Batu M2 149,771.00
Campuran Spesi 1 Pc : 2 Pp
7 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Batu M2 143,625.00
Campuran Spesi 1 Pc : 3 Pp
8 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Batu M2 140,081.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

Campuran Spesi 1 Pc : 4 Pp
NO URAIAN SATUAN HARGA SATUAN (Rp.)

9 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Batu M2 137,850.00
Campuran Spesi 1 Pc : 5 Pp
10 Pemasangan Dinding Bata Merah Ukuran (5x11x22) cm Tebal 1/2 Batu M2 136,625.00
Campuran Spesi 1 Pc : 6 Pp
11 Pemasangan Dinding Conblock HB15, Campuran Spesi 1 Pc : 3 Pp M2 223,604.00
12 Pemasangan Dinding Conblock HB15, Campuran Spesi 1 Pc : 4 Pp M2 222,799.00
13 Pemasangan Dinding Conblock HB10, Campuran Spesi 1 Pc : 3 Pp M2 171,573.00
14 Pemasangan Dinding Conblock HB10, Campuran Spesi 1 Pc : 4 Pp M2 171,501.00
15 Pemasangan Dinding Terawang (Roster) Ukuran 12x11x24 cm M2 353,033.00
Campuran Spesi 1 Pc : 3 Pp
16 Pemasangan Dinding Terawang (Roster) Ukuran 12x11x24 cm M2 353,562.00
Campuran Spesi 1 Pc : 4 Pp
17 Pemasangan Dinding Batako, Campuran Spesi 1 Pc : 4 Pp M2 135,241.00

V PEKERJAAN PLESTERAN
1 Pemasangan Plesteran 1 Pc : 1 Pp, Tebal 15 mm M2 87,353.00
2 Pemasangan Plesteran 1 Pc : 2 Pp, Tebal 15 mm M2 80,566.00
3 Pemasangan Plesteran 1 Pc : 3 Pp, Tebal 15 mm M2 77,620.00
4 Pemasangan Plesteran 1 Pc : 4 Pp, Tebal 15 mm M2 75,617.00
5 Pemasangan Plesteran 1 Pc : 5 Pp, Tebal 15 mm M2 74,471.00
6 Pemasangan Plesteran 1 Pc : 6 Pp, Tebal 15 mm M2 73,557.00
7 Pemasangan Plesteran 1 Pc : 2 Pp, Tebal 20 mm M2 107,799.00
8 Pemasangan Plesteran 1 Pc : 3 Pp, Tebal 20 mm M2 103,872.00
9 Pemasangan Plesteran 1 Pc : 4 Pp, Tebal 20 mm M2 101,142.00
10 Pemasangan Plesteran 1 Pc : 5 Pp, Tebal 20 mm M2 99,672.00
11 Pemasangan Plesteran 1 Pc : 6 Pp, Tebal 20 mm M2 98,396.00
12 Pemasangan Berapen 1 Pc : 5 Pp, Tebal 15 mm M2 43,363.00
13 Pemasangan Plesteran Skoning 1 Pc : 2 Pp, Lebar 10 mm M 76,897.00
14 Pemasangan Plesteran Ciprat 1 Pc : 2 Pp M2 61,774.00
15 Pemasangan Finishing Siar Pemasanganan Dinding Bata Merah M2 35,837.00
16 Pemasangan Finishing Siar Pemasanganan Dinding Conblock Ekspose M2 17,021.00
17 Pemasangan Finishing Siar Pemasanganan Batu Kali Campuran 1 Pc : 2 Pp M2 73,645.00
18 Pemasangan Acian M2 46,301.00

VI PEKERJAAN KAYU
1 Pembuatan dan Pemasangan Kuzen Pintu dan Jendela, Kayu Klas I M3 8,764,745.00
2 Pembuatan dan Pemasangan Kuzen Pintu dan Jendela, Kayu Klas II M3 7,443,920.00
3 Pembuatan dan Pemasangan Pintu Klamp Standar. Kayu Klas II M2 336,418.00
4 Pembuatan dan Pemasangan Pintu Klamp Sederhana. Kayu Klas III M2 310,018.00
5 Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Klas I M2 780,560.00
6 Pembuatan dan Pemasangan Daun Pintu Panel, Kayu Klas II M2 738,760.00
7 Pembuatan dan Pemasangan Pintu dan Jendela Kaca, Kayu Klas I M2 589,501.00
8 Pembuatan dan Pemasangan Pintu dan Jendela Kaca, Kayu Klas II M2 564,421.00
9 Pembuatan dan Pemasangan Pintu dan Jendela Jalusi, Kayu Klas I M2 879,560.00
10 Pembuatan dan Pemasangan Pintu dan Jendela Jalusi, Kayu Klas II M2 812,680.00
11 Pembuatan Daun Pintu Kayu Lapis (Plywood) Rangkap, M2 587,372.00
Rangka Tertutup Kayu Klas II (Lebar Sampai 90 cm)
12 Pembuatan Pintu Plywood Rangkap, Rangka Expose Kayu Klas I M2 676,555.00
13 Pembuatan Pintu Plywood Rangkap, Rangka Expose Kayu Klas II M2 649,803.00
14 Pemasangan Jalusi Kuzen, Kayu Klas I M2 703,202.00
15 Pemasangan Jalusi Kuzen, Kayu Klas II M2 640,502.00
16 Pemasangan Teakwood Rangkap, Rangka Expose Kayu Klas I M2 726,286.00
17 Pemasangan Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Klas II M2 787,017.00
18 Pemasangan Konstruksi Kuda-Kuda Konvensional, Kayu Klas I Bentang 6 M M3 7,261,100.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

19 Pemasangan Konstruksi Kuda-Kuda Konvensional, Kayu Klas II Bentang 6 M M3 6,232,600.00


20 Pemasangan Konstruksi Kuda-Kuda Expose, Kayu Klas I M3 9,303,827.00
21 Pemasangan Konstruksi Kuda-Kuda Expose, Kayu Klas II M3 8,181,827.00
22 Pemasangan Konstruksi Gordeng, Kayu Klas II M3 7,811,127.00
23 Pemasangan Rangka Atap Genteng Keramik, Kayu Klas II M2 191,042.00
24 Pemasangan Rangka Atap Genteng Beton, Kayu Klas II M2 256,877.00
25 Pemasangan Rangka Atap Sirap, Kayu Klas II M2 79,695.00
26 Pemasangan Rangka Langit-Langit (60x120) cm, Kayu Klas II M2 122,716.00
27 Pemasangan Rangka Langit-Langit (50x100) cm, Kayu Klas II M2 130,476.00
28 Pemasangan Rangka Langit-Langit (60x60) cm, Kayu Klas II M2 130,080.00
29 Pemasangan Listplank Ukuran (3x20) cm, Kayu Klas II M 80,151.00
30 Pemasangan Listplank Ukuran (3x30) cm, Kayu Klas II M 79,667.00
31 Pemasangan Rangka Dinding Pemisah (60x120) cm, Kayu Klas II M2 180,493.00
32 Pemasangan Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II M2 304,916.00
33 Pemasangan Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II M2 286,882.00
34 Pemasangan Dinding Lambriziring Dari Papan Kayu Klas II M2 390,720.00

VII PEKERJAAN BETON


1 Membuat Beton Mutu f'c = 7,4 MPa M3 851,400.00
2 Membuat Beton Mutu f'c = 9,8 MPa M3 888,909.00
3 Membuat Beton Mutu f'c = 12,2 MPa M3 918,430.00
4 Membuat Lantai Kerja Beton Mutu f'c = 7,4 MPa (K 100), Slump (3-6) cm, w/c=0,87 M3 763,667.00
5 Membuat Beton Mutu f'c = 14,5 MPa, Slump (120+20) mm M3 953,232.00
6 Membuat Beton Mutu f'c = 16,9 MPa M3 986,624.00
7 Membuat Beton Mutu f'c = 19,3 MPa M3 1,092,412.00
8 Membuat Beton Mutu f'c = 21,7 MPa M3 1,108,432.00
9 Membuat Beton Mutu f'c = 24,0 MPa M3 1,135,933.00
10 Membuat Beton Mutu f'c = 26,4 MPa M3 1,144,446.00
11 Membuat Beton Mutu f'c = 28,8 MPa M3 1,246,623.00
12 Membuat Beton Mutu f'c = 31,2 MPa M3 1,257,768.00
13 Menggunakan Ready Mixed K-225 M3 1,646,507.00
14 Pembesian Dengan Besi Polos atau Besi Ulir Kg 16,790.00
15 Pemasangan Kabel Prategang (Presstressed) Polos/Strands Kg 16,105.00
16 Pemasangan Jaring Kawat Baja (Wiremesh) Kg 15,209.00
17 Pemasangan Bekisting Untuk Pondasi M2 160,231.00
18 Pemasangan Bekisting Untuk Sloof, Kolom Praktis, Balok Praktis, Pet Beton M2 166,281.00
19 Pemasangan Bekisting Untuk Kolom M2 247,183.00
20 Pemasangan Bekisting Untuk Balok M2 250,813.00
21 Pemasangan Bekisting Untuk Lantai M2 275,629.00
22 Pemasangan Bekisting Untuk Dinding M2 248,245.00
23 Pemasangan Bekisting Untuk Tangga M2 235,015.00

VIII PEKERJAAN PENUTUP ATAP


1 Pemasangan Atap Genteng Metal Tebal 0,30 mm (Ex. Sakura Roof) M2 150,254.00
2 Pemasangan Nok Genteng Metal 90,662.00
3 Pemasangan Atap Seng Gelombang M2 63,338.00
4 Pemasangan Atap Seng Gelombang Warna M2 75,196.00
5 Pemasangan Atap Nok Seng M2 48,768.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

IX PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 Pemasangan Langit-Langit Triplek Ukuran (120x240) cm, tebal 3 mm M2 52,998.00
2 Pemasangan Langit-Langit Triplek Ukuran (120x240) cm, tebal 4 mm M2 57,948.00
3 Pemasangan Langit-Langit Lambriziring Kayu, Tebal 9 mm M2 266,871.00
4 Pemasangan List Langit-Langit Kayu Profil M 20,240.00
5 Pemasangan Langit-Langit Gypsum Board Ukuran (120x240x9) mm, Tebal 9 mm M2 178,220.00
+ Rangka Hollow
6 Pemasangan Langit-Langit Gypsum Board Ukuran (120x240x9) mm, Tebal 9 mm M2 53,205.00
7 Pemasangan List Plafond Gypsum Profil M' 35,310.00
8 Pemasangan Langit-Langit Plafond PVC (Rangka Hollow) M2 260,045.00

X PEKERJAAN SANITASI DALAM GEDUNG


1 Pemasangan Kloset Jongkok Porselen Bh 709,380.00
2 Pemasangan Kloset Duduk/Monoblok Bh 2,633,931.00
3 Pemasangan Urinoir Bh 1,728,200.00
4 Pemasangan Wastafel Bh 1,245,740.00
5 Pemasangan Bak Mandi Fibreglass Volume 0,30 m3 Bh 479,820.00
6 Pemasangan Bak Kontrol Pemasanganan Batu Bata uk. 30x30 cm Tinggi 35 cm Bh 532,582.00
7 Pemasangan Bak Kontrol Pemasanganan Batu Bata uk. 45x45 cm Tinggi 50 cm Bh 805,281.00
8 Pemasangan Bak Kontrol Pemasanganan Batu Bat uk. 60x60 cm, Tinggi 65 cm Bh 966,879.00
9 Pemasangan Pipa Galvanis dia. 1/2" M 46,458.00
10 Pemasangan Pipa Galvanis dia. 3/4" M 52,426.00
11 Pemasangan Pipa Galvanis dia. 1" M 59,246.00
12 Pemasangan Pipa Galvanis dia. 1 1/2" M 93,626.00
13 Pemasangan Pipa Galvanis dia. 3" M 159,005.00
14 Pemasangan Pipa Galvanis dia. 4" M 196,515.00
15 Pemasangan Pipa PVC Tipe AW dia. 1/2" M 24,069.00
16 Pemasangan Pipa PVC Tipe AW dia. 3/4" M 27,649.00
17 Pemasangan Pipa PVC Tipe AW dia. 1" M 32,355.00
18 Pemasangan Pipa PVC Tipe AW dia. 2" M 58,609.00
19 Pemasangan Pipa PVC Tipe AW dia. 3" M 107,940.00
20 Pemasangan Pipa PVC Tipe AW dia. 4" M 149,968.00
21 Pemasangan Kran dia. 3/4" atau 1/2" Bh 89,402.00

XI PEKERJAAN BESI DAN ALUMUNIUM


1 Pemasangan Besi Profil Kg 31,188.00
2 Pemasangan Rangka Kuda-Kuda Baja IWF Kg 31,188.00
3 Pengerjaan Pekerjaan Perakitan Kg 713.00
4 Pengelasan dengan Las Listrik Cm 2,951.00
5 Terali Besi Strip (2x3) mm M2 648,133.00
6 Pemasangan Kuzen Pintu Alluminium 4" (Silver) M' 98,568.00
7 Pemasangan Kuzen Pintu Alluminium 4" (Hitam/Coklat) M' 108,732.00
8 Pemasangan Kuzen Pintu Alluminium 4" (Coating Powder) M' 124,704.00
9 Pemasangan Kuzen Pintu Alluminium 3" (Silver) M' 86,952.00
10 Pemasangan Kuzen Pintu Alluminium 3" (Hitam/Coklat) M' 94,212.00
11 Pemasangan Kuzen Pintu Alluminium 3" (Coating Powder) M' 111,636.00
12 Pemasangan Rangka Besi Hollow 40.40.1.6 mm, Modul 60x120 cm, Untuk Partisi M2 171,886.00
13 Pemasangan Rangka Hollow Zincalume 40.40 mm, Modul 60x60 cm, Untuk Flafon M2 142,103.00
14 Pekerjaan Kuda-Kuda Baja Ringan M2 200,656.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

XII PEKERJAAN KUNCI DAN KACA


1 Pemasangan Kunci Tanam Antik Bh 433,108.00
2 Pemasangan Kunci Tanam Biasa Bh 253,082.00
3 Pemasangan Kunci Silinder Bh 355,558.00
4 Pemasangan Engsel Pintu Bh 42,937.00
5 Pemasangan Kaca, Tebal 5 mm M2 171,802.00
6 Pemasangan Kaca, Tebal 3 mm M2 123,305.00
7 Pemasangan Kaca Rayban, Tebal 5 mm M2 190,678.00
8 Pemasangan Kaca Rayban, Tebal 3 mm M2 139,858.00

XIII PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


1 Pemasangan Lantai Keramik Bermotif Ukuran (40x40) cm M2 255,198.00
2 Pemasangan Lantai Keramik Polos Ukuran (30x30) cm M2 239,312.00
3 Pemasangan Lantai Keramik Bermotif Ukuran (30x30) cm M2 245,664.00
4 Pemasangan Lantai Keramik Polos Ukuran (25x25) cm M2 247,965.00
5 Pemasangan Lantai Keramik Bermotif Ukuran (25x25) cm M2 251,199.00
6 Pemasangan Lantai Granit Ukuran (60x60) cm M2 395,732.00
9 Pemasangan Dinding Keramik Polos Ukuran (25x40) cm M2 309,853.00
10 Pemasangan Dinding Keramik Bermotif Ukuran (25x40) cm M2 316,205.00
11 Pemasangan Dinding Batu Alam Andesit M2 386,554.00

XIV PEKERJAAN PENGECATAN


1 Pengikisan/Pengerokan Permukaan Cat Lama M2 19,162.00
2 Pencucian Bidang Permukaan Tembok Yang Pernah Dicat M2 18,912.00
3 Pengerokan Karat Pada Permukaan Baja Cara Manual M2 19,709.00
4 Pengecatan Bidang Kayu Lama M2 31,912.00
5 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 46,966.00
6 Pengecatan Bidang Kayu Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 3 Lapis Cat Penutup) M2 66,315.00
7 Pengecatan Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 25,385.00
8 Pengecatan Tembok Baru (Exterior) dengan Dulux Weathersheald M2 52,427.00
9 Pengecatan Tembok Lama (1 Lapis Cat Dasar, 2 Lapis Cat Penutup) M2 18,897.00
10 Pelaburan Bidang Kayu dengan Politur M2 67,848.00
11 Pelaburan Bidang Kayu dengan Vernis M2 57,675.00
12 Pengecatan Permukaan Baja dengan Meni Besi M2 37,908.00
13 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah M2 74,921.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

1 1 M3 BONGKAR BETON SECARA KONVENSIONAL


I PEKERJAAN TANAH
1 Pembersihan dan Striping/Kosrekan M2 8,217.00
2 Tebas Tebang Berupa Memotong dan Membersihkan Lokasi Dari Tanaman Tumbuhan Ø < 15 cm M2 10,315.00
3 Cabut 1 Tunggul Pohon Tanaman Keras Ø ≥ 15 cm dan Membuang Sisa Tunggul Kayu dan Akar-akarnya M2 43,890.00
4 Pasang Profil Melintang Galian Tanah M' 36,355.00
5 Pasang Bouwplank M' 58,674.00
6 Galian Tanah Biasa sedalam ≤ 1 m M3 77,102.00
7 Galian Tanah Biasa sedalam > 1 m s.d. 2 m M3 92,441.00
8 Galian Tanah Biasa sedalam > 2 m s.d. 3 m M3 104,082.00
9 Galian Tanah Berbatu sedalam ≤ 1 m M3 185,019.00
10 Galian Tanah Berbatu sedalam > 1 m s.d. 2 m M3 205,425.00
11 Galian Tanah Berbatu sedalam > 2 m s.d. 3 m M3 225,967.00
12 Galian Batu sedalam ≤ 1 m M3 462,617.00
13 Galian Batu sedalam > 1 m s.d. 2 m M3 513,562.00
14 Galian Batu sedalam > 2 m s.d. 3 m M3 564,998.00
15 Galian Tanah Cadas atau Tanah Keras sedalam ≤ 1 m M3 171,187.00
16 Galian Tanah Cadas atau Tanah Keras sedalam > 1 m s.d. 2 m M3 190,634.00
17 Galian Tanah Cadas atau Tanah Keras sedalam > 2 m s.d. 3 m M3 205,425.00
18 Galian Lumpur sedalam ≤ 1 m M3 113,668.00
19 Galian Lumpur sedalam > 1 m s.d. 2 m M3 136,950.00
20 Galian Lumpur sedalam > 2 m s.d. 3 m M3 157,492.00
21 Galian Pasir sedalam ≤ 1 m M3 90,387.00
22 Galian Pasir sedalam > 1 m s.d. 2 m M3 109,560.00
23 Galian Pasir sedalam > 2 m s.d. 3 m M3 125,994.00
24 Timbunan Tanah atau Urugan Tanah Kembali M3 45,193.00
25 Pemadatan Tanah M3 76,725.00

II PEKERJAAN PASANGAN
1 Bongkar Pasnagan Batu dan Pembersihan Batu (Manual) M3 204,006.00
2 Bongkar Pemasanganan Batu (Manual) M3 174,262.00
3 Bongkar Pemasanganan Batu dengan Jack Hammer M3 95,920.00
4 Membersihkan Bongkaran Pemasanganan Batu untuk Pemanfaatan Kembali Material Batu M3 29,744.00

III PEKERJAAN BETON


1 Bongkar Beton secara Konvensional M3 579,040.00
2 Bongkar Beton dengan Jack Hammer M3 253,000.00
3 Beton Mutu f'c = 7,4 MPa (K100), Slump (12+2) CM, w/c=0.87
a. Manual M3 851,400.00
b. Menggunakan Molen M3 860,785.00
4 Beton Mutu f'c = 9,8 MPa (K125), Slump (12+2) CM, w/c=0.78
a. Manual M3 888,909.00
b. Menggunakan Molen M3 898,229.00
5 Beton Mutu f'c = 12,2 MPa (K150), Slump (12+2) CM, w/c=0.72
a. Manual M3 918,430.00
b. Menggunakan Molen M3 927,236.00
6 Beton Mutu fc' = 14,5 MPa, (K175), Slump (12+2) CM, w/c=0.66
a. Manual M3 953,232.00
b. Menggunakan Molen M3 961,842.00
NO URAIAN SATUAN HARGA SATUAN (Rp.)

7 Beton Mutu fc' = 16,9 MPa (K200), Slump (12+2) CM, w/c=0.61
a. Manual M3 986,624.00
b. Menggunakan Molen M3 995,106.00
8 Beton Mutu fc' = 19,3 MPa (K225), Slump (12+2) CM, w/c=0.58
a. Manual M3 1,092,412.00
b. Menggunakan Molen M3 1,098,825.00
9 Beton Mutu fc' = 21,7 MPa (K250) Kedap Air, Slump (12+2) CM, w/c=0.56
a. Manual M3 1,108,432.00
b. Menggunakan Molen M3 1,114,489.00
10 Beton Mutu fc' = 24,0 MPa (K275) Kedap Air, Slump (12+2) CM, w/c=0.53
a. Manual M3 1,135,933.00
b. Menggunakan Molen M3 1,143,892.00
11 Beton Mutu fc' = 26,4 MPa (K300) Kedap Air, Slump (12+2) CM, w/c=0.52 (Kedap Air)
a. Manual M3 1,144,446.00
b. Menggunakan Molen M3 1,151,042.00
12 Beton Mutu fc' = 28,8 MPa (K325) Kedap Air, Slump (12+2) CM, w/c=0.49 (Kedap Air)
a. Manual M3 1,246,623.00
b. Menggunakan Molen M3 1,243,367.00
13 Beton Mutu fc' = 31,2 MPa (K350) Kedap Air, Slump (12+2) CM, w/c=0.48 (Kedap Air)
a. Manual M3 1,257,768.00
b. Menggunakan Molen M3 1,254,512.00
14 Beton Menggunakan Ready Mixed K225 M3 1,646,507.00

Solok, Februari 2019


Kepala Dinas
Perumahan dan Kawasan Permukiman

JUSMARDI, S.Pd
NIP. 19641211 198910 1 002
DAFTAR ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
TAHUN ANGGARAN 2013

No URAIAN H. SATUAN UPAH BAHAN JUMLAH

a b c d e f

I PEKERJAAN BETON (SNI 7394:2008)

1 1 M3 MEMBUAT BETON MUTU fc' = 7,4 MPa (K 100), SLUMP (12 + 2) CM, W/C = 0,87
247.0000 Kg Semen Portland Rp. 1,350.00 Rp. 333,450.00
0.6200 M3 Pasir Beton Rp. 165,000.00 Rp. 102,300.00
0.7400 M3 Split Rp. 253,000.00 Rp. 187,220.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 666,657.50 Rp. 900,002.50
Overhead 5% Rp. 45,000.13
Jumlah Rp. 945,002.63
Dibulatkan Rp. 945,002.00

2 1 M3 MEMBUAT BETON MUTU fc' = 9,8 MPa (K 125), SLUMP (12 + 2) CM, W/C = 0,78
276.0000 Kg Semen Portland Rp. 1,350.00 Rp. 372,600.00
0.5900 M3 Pasir Beton Rp. 165,000.00 Rp. 97,350.00
0.7500 M3 Kerikil Beton Rp. 253,000.00 Rp. 189,750.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 703,387.50 Rp. 936,732.50
Overhead 5% Rp. 46,836.63
Jumlah Rp. 983,569.13
Dibulatkan Rp. 983,569.00

3 1 M3 MEMBUAT BETON MUTU fc' = 12,2 MPa (K 150), SLUMP (12 + 2) CM, W/C = 0,72
299.0000 Kg Semen Portland Rp. 1,350.00 Rp. 403,650.00
0.5700 M3 Pasir Beton Rp. 165,000.00 Rp. 94,050.00
0.7500 M3 Kerikil Beton Rp. 253,000.00 Rp. 189,750.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 731,137.50 Rp. 964,482.50
Overhead 5% Rp. 48,224.13
Jumlah Rp. 1,012,706.63
Dibulatkan Rp. 1,012,706.00

4 1 M3 MEMBUAT BETON MUTU fc' = 14,5 MPa (K 175), SLUMP (12 + 2) CM, W/C = 0,66
326.0000 Kg Semen Portland Rp. 1,350.00 Rp. 440,100.00
0.5400 M3 Pasir Beton Rp. 165,000.00 Rp. 89,100.00
0.7600 M3 Kerikil Beton Rp. 253,000.00 Rp. 192,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 765,167.50 Rp. 998,512.50
Overhead 5% Rp. 49,925.63
Jumlah Rp. 1,048,438.13
Dibulatkan Rp. 1,048,438.00

Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 14 dari 29
No URAIAN H. SATUAN UPAH BAHAN JUMLAH

a b c d e f

5 1 M3 MEMBUAT BETON MUTU fc' = 16,9 MPa (K 200), SLUMP (12 + 2) CM, W/C = 0,61
352.0000 Kg Semen Portland Rp. 1,350.00 Rp. 475,200.00
0.5200 M3 Pasir Beton Rp. 165,000.00 Rp. 85,800.00
0.7600 M3 Kerikil Beton Rp. 253,000.00 Rp. 192,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 796,967.50 Rp. 1,030,312.50
Overhead 5% Rp. 51,515.63
Jumlah Rp. 1,081,828.13
Dibulatkan Rp. 1,081,828.00

6 1 M3 MEMBUAT BETON MUTU fc' = 19,3 MPa (K 225), SLUMP (12 + 2) CM, W/C = 0,58
371.0000 Kg Semen Portland Rp. 1,350.00 Rp. 500,850.00
0.4900 M3 Pasir Beton Rp. 165,000.00 Rp. 80,850.00
0.7700 M3 Kerikil Beton Rp. 253,000.00 Rp. 194,810.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 820,197.50 Rp. 1,053,542.50
Overhead 5% Rp. 52,677.13
Jumlah Rp. 1,106,219.63
Dibulatkan Rp. 1,106,219.00

7 1 M3 MEMBUAT BETON MUTU fc' = 21,7 MPa (K 250), SLUMP (12 + 2) CM, W/C = 0,56
384.0000 Kg Semen Portland Rp. 1,350.00 Rp. 518,400.00
0.4900 M3 Pasir Beton Rp. 165,000.00 Rp. 80,850.00
0.7600 M3 Kerikil Beton Rp. 253,000.00 Rp. 192,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 835,217.50 Rp. 1,068,562.50
Overhead 5% Rp. 53,428.13
Jumlah Rp. 1,121,990.63
Dibulatkan Rp. 1,121,990.00

8 1 M3 MEMBUAT BETON MUTU fc' = 24,0 MPa (K 275), SLUMP (12 + 2) CM, W/C = 0,53
406.0000 Kg Semen Portland Rp. 1,350.00 Rp. 548,100.00
0.4800 M3 Pasir Beton Rp. 165,000.00 Rp. 79,200.00
0.7600 M3 Kerikil Beton Rp. 253,000.00 Rp. 192,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 863,267.50 Rp. 1,096,612.50
Overhead 5% Rp. 54,830.63
Jumlah Rp. 1,151,443.13
Dibulatkan Rp. 1,151,443.00

9 1 M3 MEMBUAT BETON MUTU fc' = 26,4 MPa (K 300), SLUMP (12 + 2) CM, W/C = 0,52
413.0000 Kg Semen Portland Rp. 1,350.00 Rp. 557,550.00
0.4800 M3 Pasir Beton Rp. 165,000.00 Rp. 79,200.00
0.7500 M3 Kerikil Beton Rp. 253,000.00 Rp. 189,750.00

Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 15 dari 29
No URAIAN H. SATUAN UPAH BAHAN JUMLAH

a b c d e f
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

1.6500 Pekerja Rp. 110,000.00 Rp. 181,500.00


0.2750 Tukang Batu Rp. 130,000.00 Rp. 35,750.00
0.0280 Kepala Tukang Rp. 145,000.00 Rp. 4,060.00
0.0830 Mandor Rp. 145,000.00 Rp. 12,035.00
Rp. 233,345.00 Rp. 870,187.50 Rp. 1,103,532.50
Overhead 5% Rp. 55,176.63
Jumlah Rp. 1,158,709.13
Dibulatkan Rp. 1,158,709.00

10 1 M3 MEMBUAT BETON MUTU fc' = 28,8 MPa (K 325), SLUMP (12 + 2) CM, W/C = 0,49
439.0000 Kg Semen Portland Rp. 1,350.00 Rp. 592,650.00
0.4700 M3 Pasir Beton Rp. 165,000.00 Rp. 77,550.00
0.7400 M3 Kerikil Beton Rp. 253,000.00 Rp. 187,220.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

2.1000 Pekerja Rp. 110,000.00 Rp. 231,000.00


0.3500 Tukang Batu Rp. 130,000.00 Rp. 45,500.00
0.0350 Kepala Tukang Rp. 145,000.00 Rp. 5,075.00
0.1050 Mandor Rp. 145,000.00 Rp. 15,225.00
Rp. 296,800.00 Rp. 901,107.50 Rp. 1,197,907.50
Overhead 5% Rp. 59,895.38
Jumlah Rp. 1,257,802.88
Dibulatkan Rp. 1,257,802.00

11 1 M3 MEMBUAT BETON MUTU fc' = 31,2 MPa (K 350), SLUMP (12 + 2) CM, W/C = 0,48
448.0000 Kg Semen Portland Rp. 1,350.00 Rp. 604,800.00
0.4700 M3 Pasir Beton Rp. 165,000.00 Rp. 77,550.00
0.7400 M3 Kerikil Beton Rp. 253,000.00 Rp. 187,220.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00

2.1000 Pekerja Rp. 110,000.00 Rp. 231,000.00


0.3500 Tukang Batu Rp. 130,000.00 Rp. 45,500.00
0.0350 Kepala Tukang Rp. 145,000.00 Rp. 5,075.00
0.1050 Mandor Rp. 145,000.00 Rp. 15,225.00
Rp. 296,800.00 Rp. 913,257.50 Rp. 1,210,057.50
Overhead 5% Rp. 60,502.88
Jumlah Rp. 1,270,560.38
Dibulatkan Rp. 1,270,560.00

Solok, Januari 2013


Kepala Dinas Pekerjaan Umum Kabid Cipta Karya Kabid Bina Program dan Pengawasan
Kota Solok Dinas Pekerjaan Umum Kota Solok Dinas Pekerjaan Umum Kota Solok

Ir. Ardy Syafwan Warfendi Boy, S.T. Ir. Nofi Hendri, M.T.
NIP. 19570513 198901 1 001 NIP. 19570831 198103 1 003 NIP. 19661115 199308 1 001

Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 16 dari 29
Rencana Anggaran Biaya (RAB)
REKAPITULASI

Kegiatan : Urusan Peningkatan PSU Lingkungan


Pekerjaan : Peningkatan Fasilitas Lingkungan Permukiman Kawasan Perumahan Belibis II RT
01 / RW 06 Kel. Kampung Jawa
Lokasi : Kota Solok
SKPD : Dinas Perumahan dan Kawasan Permukiman
T.A : 2021

JUMLAH
NO URAIAN PEKERJAAN HARGA
( Rp )
a b c
A Biaya Umum
I Biaya K3 Konstruksi 3,987,500.00
B Pekerjaan Jalan Lingkungan
I Pekerjaan Pendahuluan 685,358.61
II Pekerjaan Jalan 220,611,006.15
C Pekerjaan Saluran
I Pekerjaan Pendahuluan 7,471,747.28
II Pekerjaan Drainase 449,058,065.30
Jumlah Pekerjaan 681,813,677.34
Ppn 10% 68,181,367.73
Jumlah Total 749,995,045.08
Dibulatkan 749,995,000.00

Terbilang : Tujuh Ratus Empat Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Lima Ribu Rupiah

Solok, Juni 2021


Diperiksa Oleh Dibuat Oleh
Tim Teknis Konsultan Perencana
PT. Multikarya Interplan Konsultan
1 RINI MARLINA, SST, M.Si 1, .......................
Ketua

2 YONI YULIANTI, ST, M.Si 2, .......................


Sekretaris Ir. NOFITA HARWIN, MT, MM
Direktur
3 FAUZI, ST, MT 3, .......................
Anggota

4 ALEXIS, S.Sos 4, .......................


Anggota

5 MARINI ROSA, ST 5, .......................


Anggota

Disetujui Oleh Diperiksa Oleh


Pejabat Pembuat Komitmen Pejabat Pelaksana Teknis Kegiatan
Dinas Perumahan dan Kawasan Permukiman Dinas Perumahan dan Kawasan Permukiman

RINALDI, ST RINA MAILINDA, ST, MT


Nip. 19670924 199003 1 004 Nip. 19800519 200604 2 016

Diketahui Oleh
Kepala Dinas
Dinas Perumahan dan Kawasan Permukiman

JUSMARDI, S.Pd
Nip. 19641211 198910 1 002
RENCANA ANGGARAN BIAYA

Kegiatan : Urusan Peningkatan PSU Lingkungan


Pekerjaan : Peningkatan Fasilitas Lingkungan Permukiman Kawasan Perumahan Belibis II RT 01 / RW
06 Kel. Kampung Jawa
Lokasi : Kota Solok
SKPD : Dinas Perumahan dan Kawasan Permukiman
T.A : 2021

HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
a b c d e f

A Biaya Umum
I Biaya K3 Konstruksi Ls 1.00 3,987,500.00 3,987,500.00
Jumlah 3,987,500.00
B Pekerjaan Jalan Lingkungan
I Pekerjaan Pendahuluan
1 Pembersihan Lapangan dan Perataan M² 83.41 8,217.00 685,358.61
Jumlah 685,358.61
II Pekerjaan Jalan
1 Pas. Bekisting Jalan M² 117.76 160,231.00 18,869,276.84
2 Pas. Plastik Cor M² 606.19 3,500.00 2,121,673.93
Pek. Cor Jalan Beton Mutu K-225, t = 20cm (Ready
3 Mix) M³ 121.24 1,646,507.00 199,620,055.38

Jumlah 220,611,006.15
C Pekerjaan Saluran
I Pekerjaan Pendahuluan
1 Pek. Bowplank M¹ 46.80 68,678.00 3,214,130.40
2 Pek. Pembongkaran Saluran Lama M³ 9.36 173,767.00 1,626,459.12
3 Pek. Pembongkaran Pelat Beton M³ 4.54 579,040.00 2,631,157.76
Jumlah 7,471,747.28
II Pekerjaan Drainase
1 Pek. Galian Tanah M³ 281.00 94,737.00 26,621,097.00
2 Pasangan Batu kali ad 1:4 M³ 228.76 820,377.00 187,669,442.52
3 Pek. Plesteran ad 1:4 M² 772.10 75,617.00 58,383,885.70
4 Pek. Acian M² 772.10 46,301.00 35,749,002.10
5 Pek. Saluran Tertutup (Beton Bertulang)
Bekisting Dinding M² 98.40 160,231.00 15,766,730.40
Bekisting Plat (Floordeck t=7 mm) M² 13.94 176,957.00 2,466,780.58
Pembesian Kg 1,144.49 16,790.00 19,216,025.73
Pek. Beton Mutu K-225, (Ready Mix) M³ 15.20 1,646,507.00 25,031,516.62
6 Pek. Pelat Duiker
Bekisting Plat (Floordeck t=7 mm) M² 87.00 176,957.00 15,395,259.00
Pembesian Kg 1,733.71 16,790.00 29,108,932.20
Pek. Beton Mutu K-225, t = 15cm (Ready Mix) M³ 13.35 1,646,507.00 21,980,868.45
7 Pek. Pembuangan Hasil Galian M³ 281.00 41,525.00 11,668,525.00
Jumlah 449,058,065.30
Jumlah Total Pekerjaan 681,813,677.34

Solok, Juni 2021


Dibuat Oleh
Konsultan Perencana
PT. Multikarya Interplan Konsultan

Ir. NOFITA HARWIN, MT, MM


Direktur
RINCIAN BIAYA K3 KONSTRUKSI

Program : Urusan Peningkatan PSU Lingkungan


Kegiatan : Peningkatan Fasilitas Lingkungan Permukiman Kawasan Perumahan Belibis II RT 01 / RW
Pekerjaan : Kota
06 Solok
Kel. Kampung Jawa
Lokasi : Dinas Perumahan dan Kawasan Permukiman
SKPD : 2021
HARGA JUMLAH
NO URAIAN PEKERJAAN STN VOLUME SATUAN HARGA
( Rp ) ( Rp )
a b c d e f

A Biaya Umum
I Biaya K3 Konstruksi
1 Helm Buah 9.00 40,000.00 360,000.00
2 Rompi Buah 9.00 30,000.00 270,000.00
3 Sepatu Pasang 9.00 110,000.00 990,000.00
4 Sarung Tangan Pasang 9.00 2,500.00 22,500.00
5 Masker Buah 9.00 5,000.00 45,000.00
6 Kaca Mata Pelindung Buah 4.00 30,000.00 120,000.00
7 Kotak P3K Buah 1.00 100,000.00 100,000.00
II Petugas K3
1 Personil K3 dan Laporan RK3K Ls 1.00 1,980,000.00 1,980,000.00
III Rambu Rambu
1 Rambu Rambu Peringatan Ls 1.00 100,000.00 100,000.00

Jumlah 3,987,500.00
PERHITUNGAN VOLUME PEKERJAAN

Kegiatan : Urusan Peningkatan PSU Lingkungan


Pekerjaan : Peningkatan Fasilitas Lingkungan Permukiman Kawasan Perumahan Belibis II RT 01 / RW 06 Kel. Kampung Jawa
Lokasi : Kota Solok
T.A : 2021

Perhitungan Volume Vol


No Uraian Pekerjaan Sat
Total

B Pekerjaan Jalan Lingkungan


I Pekerjaan Pendahuluan
1 Pembersihan Lapangan dan Perataan Lihat Lampiran Tabel Volume Jalan 83.41 M²

II Pekerjaan Jalan
4 Pas. Bekisting Jalan Lihat Lampiran Tabel Volume Jalan 117.76 M²
5 Pas. Plastik Cor Lihat Lampiran Tabel Volume Jalan 606.19 M²
6 Pek. Cor Jalan Beton Mutu K-225, t = 20cm (Read Lihat Lampiran Tabel Volume Jalan 121.24 M³

C Pekerjaan Saluran
Pekerjaan Pendahuluan
1 Pek. Bowplank P : 10.00 x 1.00 46.80 M¹
468.00 : 10.00 x 1.00 = 46.80

2 Pek. Pembongkaran Saluran Lama P x L x T x n = Sub Volume 9.36 M³


Ruas 2 39.00 x 0.20 x 0.30 x 4.00 = 9.36

3 Pek. Pembongkaran Pelat Beton P x L x T x n = Sub Volume 4.54 M³


3.00 x 0.80 x 0.08 x 9.00 = 1.73
4.00 x 0.80 x 0.08 x 11.00 = 2.82
4.54
Pekerjaan Drainase
1 Pek. Galian Tanah Lihat Tabel Perhitungan Saluran 281.00 M³
2 Pasangan Batu kali ad 1:4 Lihat Tabel Perhitungan Saluran 228.76 M³
3 Pek. Plesteran ad 1:4 Lihat Tabel Perhitungan Saluran 772.10 M²
4 Pek. Acian Lihat Tabel Perhitungan Saluran 772.10 M²
5 Pek. Saluran Tertutup (Beton Bertulang) Lihat Tabel Saluran Terturup
- Bekisting Dinding Lihat Tabel Saluran Terturup 98.40 M²
- Bekisting Plat (Floordeck t=7 mm) Lihat Tabel Saluran Terturup 13.94 M²
Pembesian Lihat Tabel Saluran Terturup 1,144.49 Kg
Pek. Beton Mutu K-225, (Ready Mix) Lihat Tabel Saluran Terturup 15.20 M³
6 Pek. Pelat Duiker Lihat Tabel Plat Duiker
- Bekisting Plat (Floordeck t=7 mm) Lihat Tabel Plat Duiker 87.00 M²
Pembesian Lihat Tabel Plat Duiker 1,733.71 Kg
Pek. Beton Mutu K-225, t = 15cm (Ready MixLihat Tabel Plat Duiker 13.35 M³
7 Pek. Pembuangan Hasil Galian Lihat Tabel Perhitungan Saluran 281.00 M³

Solok, Juni 2021


Dibuat Oleh
Konsultan Perencana
PT. Multikarya Interplan Konsultan

Ir. NOFITA HARWIN, MT, MM


Direktur
Tabel Volume Jalan

Pembersihan Lapangan Lebar Jalan Bekisting Volume


Sirtu Badan Jalan Beton Badan Jalan
Panjang Lebar STA STA Plastik
Sta ke Sta Rata Rata Vol. Luas STA Awal Rata Rata Tinggi Jumlah Volume
Awal Akhir Akhir Tebal Volume Tebal Volume Alas
M¹ M¹ M¹ M¹ M² M¹ M¹ M¹ M¹ M³ M¹ M³ M¹ sisi M² M²
a b c d e f g h i l m n o p q r s

> Ruas 1 Saluran Saja

> Ruas 2
Sta, 0,00 s/d Sta, 25.00 25.00 2.00 1.00 1.50 37.50 6.00 6.00 6.00 - 0.20 30.00 0.20 2 10.00 150.00
Sta, 25.00 s/d Sta, 50.00 25.00 1.00 1.00 1.00 25.00 6.00 5.50 5.75 - 0.20 28.75 0.20 2 10.00 143.75
Sta, 50.00 s/d Sta, 63.41 13.41 1.00 1.00 1.00 13.41 5.50 6.00 5.75 - 0.20 15.42 0.20 2 5.36 77.09

> Ruas 3
Sta, 0,00 s/d Sta, 25.00 25.00 0.60 - 0.30 7.50 4.35 4.00 4.18 - 0.20 20.88 0.20 2 10.00 104.38
Sta, 25.00 s/d Sta, 56.00 31.00 - - - - 4.00 4.45 4.23 - 0.20 26.20 0.20 2 12.40 130.98

Jumlah 294.41 83.41 - 121.24 117.76 606.19


Tabel Perhitungan Drainase Jalan

Galian Pasangan Batu Kali Plesteran


Panjang Latai / Kopor Badan Pasangan
No Sta ke Sta Lebar Tinggi Volume Volume Hor. Ver. Volume Ket.
Lebar Tinggi Lb Atas Lb Bawah Tinggi Jumlah
m m m m³ m m m m m buah m³ m m m²
a b c d e h i j k l m n o p q r s

1 > Ruas 1
Sta, 0,00 s/d Sta, 25.00 25.00 0.75 1.40 53.75
Sta, 25.00 s/d Sta, 175.00 150.00 1.30 0.80 156.00 1.30 0.20 0.25 0.40 0.60 2.00 97.50 0.90 1.20 315.00

2 > Ruas 2
Sta, 0,00 s/d Sta, 39.00 39.00 1.00 0.60 23.40 1.00 0.20 0.25 0.35 0.50 2.00 19.50 0.55 1.00 60.45

3 > Ruas 3
Kiri
Sta, 0,00 s/d Sta, 25.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 25.00 s/d Sta, 56.00 31.00 1.00 0.40 12.40 1.00 0.20 0.25 0.35 0.40 2.00 13.64 0.55 0.80 41.85
Sta, 75.00 s/d Sta, 100.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 100.00 s/d Sta, 119.00 19.00 1.00 0.40 7.60 1.00 0.20 0.25 0.35 0.40 2.00 8.36 0.55 0.80 25.65
Kanan
Sta, 0,00 s/d Sta, 25.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 25.00 s/d Sta, 50.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 50.00 s/d Sta, 75.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 75.00 s/d Sta, 100.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 100.00 s/d Sta, 125.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 125.00 s/d Sta, 150.00 25.00 1.00 0.40 10.00 1.00 0.20 0.25 0.35 0.40 2.00 11.00 0.55 0.80 33.75
Sta, 150.00 s/d Sta, 154.00 4.00 1.00 0.40 1.60 1.00 0.20 0.25 0.35 0.40 2.00 1.76 0.55 0.80 5.40

Jumlah 468.00 281.00 228.76 772.10


Tabel Saluran Beton Bertulang

Beton Bekisting Pembesian


Jumlah
Type pelat Panjang Arah memanjang Arah melintang Ket
No Pelat Lebar Tebal Volume Lebar Volume Volume
duiker Ø Besi berat/m¹ Panjang jarak Jumlah Ø Besi berat/m¹ Panjang Jarak Jumlah
buah m m m m³ m m² m kg m m buah m kg m m buah kg
a b c d e f g h i j k l m n o p q r s t u

R.1 (STA 0175-216)


Lantai 1 41.00 0.84 0.12 4.13 - - 8.00 0.395 81.96 0.20 6.00 12.00 0.888 1.70 0.20 205.00 503.41
Dinding 2 41.00 0.60 0.12 5.90 0.60 98.40 8.00 0.395 81.96 0.20 4.00 12.00 0.888 1.22 0.20 205.00 702.76
P. Penutup 1 41.00 0.84 0.15 5.17 0.34 13.94 8.00 0.395 81.99 0.20 6.00 12.00 0.888 1.76 0.20 205.00 514.40

4 15.20 112.34 1,720.58

ket Kolom
a Nomor l Jumlah Panjang besi total arah memanjang
b Type pelat yang di kerjakan 2 x ((d - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
c Jumlah dalam pekerjaan m Jarak Pembesian arah memanjang
d Panjang pelat n Jumlah besi dalam arah memanjang
e Lebar pelat yang di cor (e / m) + 1
f Tinggi Pelat yang di cor o Diameter besi arah melintang
g Volume Cor Beton p Berat Besi "o" per meter
exfxdxc q Jumlah Panjang besi total arah melintang
h Lebar Bersih bekisting 2 x ((e - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
e - 0,25 - 0,25 r Jarak Pembesian arah melintang
i Volume Bekisting (d / m) + 1
hxdxc s Jumlah besi dalam arah melintang
j Diameter besi arah memanjang t
Total Volume berat besi arah memanjang dan arah melintang
k Berat Besi "j" per meter
((k x l x n)+(p x q x s)) x c
Tabel Saluran Beton Bertulang

Beton Bekisting Pembesian


Jumlah
Type pelat Panjang Arah memanjang Arah melintang Ket
No Pelat Lebar Tebal Volume Lebar Volume Volume
duiker Ø Besi berat/m¹ Panjang jarak Jumlah Ø Besi berat/m¹ Panjang Jarak Jumlah
buah m m m m³ m m² m kg m m buah m kg m m buah kg
a b c d e f g h i j k l m n o p q r s t u

R.1 (STA 0175-216)


Lantai 1 41.00 0.84 0.12 4.13 - - 8.00 0.395 41.00 0.20 6.00 12.00 0.888 0.84 0.20 205.00 249.93
Dinding 2 41.00 0.60 0.12 5.90 0.60 98.40 8.00 0.395 41.00 0.20 4.00 12.00 0.888 0.60 0.20 205.00 347.80
P. Penutup 1 41.00 0.84 0.15 5.17 0.84 34.44 8.00 0.395 81.99 0.15 7.00 12.00 0.888 1.76 0.20 205.00 546.75

4 15.20 132.84 1,144.49

ket Kolom
a Nomor l Jumlah Panjang besi total arah memanjang
b Type pelat yang di kerjakan 2 x ((d - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
c Jumlah dalam pekerjaan m Jarak Pembesian arah memanjang
d Panjang pelat n Jumlah besi dalam arah memanjang
e Lebar pelat yang di cor (e / m) + 1
f Tinggi Pelat yang di cor o Diameter besi arah melintang
g Volume Cor Beton p Berat Besi "o" per meter
exfxdxc q Jumlah Panjang besi total arah melintang
h Lebar Bersih bekisting 2 x ((e - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
e - 0,25 - 0,25 r Jarak Pembesian arah melintang
i Volume Bekisting (d / m) + 1
hxdxc s Jumlah besi dalam arah melintang
j Diameter besi arah memanjang t
Total Volume berat besi arah memanjang dan arah melintang
k Berat Besi "j" per meter
((k x l x n)+(p x q x s)) x c
Tabel Pelat Duiker

Beton Bekisting Pembesian


Jumlah Penguranga
Type pelat Panjang Arah memanjang Arah melintang
No Pelat Lebar Tinggi Volume Lebar Volume Volume n plesteran
duiker Ø Besi berat/m¹ Panjang jarak Jumlah Ø Besi berat/m¹ Panjang Jarak Jumlah
buah m m m m³ m m² m kg m m buah m kg m m buah kg
a b c d e f g h i j k l m n o p q r s t u

1 Type 3 9 3.00 1.00 0.15 4.05 1.00 27.00 12.00 0.888 5.99 0.20 6.00 12.00 0.888 2.08 0.20 15.00 536.44 -
2 Type 4 11 4.00 1.00 0.15 6.60 1.00 44.00 12.00 0.888 7.99 0.20 6.00 12.00 0.888 2.08 0.20 20.00 874.39 - 6
3 Type 5 2 5.00 1.00 0.15 1.50 1.00 10.00 12.00 0.888 9.99 0.20 6.00 12.00 0.888 2.08 0.20 25.00 198.75 -
4 Type 6 1 6.00 1.00 0.20 1.20 1.00 6.00 12.00 0.888 12.04 0.20 6.00 12.00 0.888 2.18 0.20 31.00 124.13 -

23 13.35 87.00 1,733.71 -

ket Kolom
a Nomor l Jumlah Panjang besi total arah memanjang
b Type pelat yang di kerjakan 2 x ((d - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
c Jumlah dalam pekerjaan m Jarak Pembesian arah memanjang
d Panjang pelat n Jumlah besi dalam arah memanjang
e Lebar pelat yang di cor (e / m) + 1
f Tinggi Pelat yang di cor o Diameter besi arah melintang
g Volume Cor Beton p Berat Besi "o" per meter
exfxdxc q Jumlah Panjang besi total arah melintang
h Lebar Bersih bekisting 2 x ((e - 0,05 - 0,05)+(f - 0,03 - 0,03)) + 0,05 + 0,05
e - 0,25 - 0,25 r Jarak Pembesian arah melintang
i Volume Bekisting (d / m) + 1
hxdxc s Jumlah besi dalam arah melintang
j Diameter besi arah memanjang t
Total Volume berat besi arah memanjang dan arah melintang
k Berat Besi "j" per meter
((k x l x n)+(p x q x s)) x c
Tabel Perhitungan Tembok Penahan Jalan

Galian Pasangan Batu Kali Plesteran


Panjang Kopor Badan Pasangan
No Sta ke Sta Lebar Tinggi Volume Volume Hor. Ver. Volume Ket.
Lebar Tinggi Lb Atas Lb Bawah Tinggi Jumlah
m m m m³ m m m m m buah m³ m m m²
a b c d e h i j k l m n o p q r s

1 > Ruas 4
Sta, 0,00 s/d Sta, 12.10 - 0.50 0.64 - 0.50 0.20 0.15 0.40 0.70 1.00 -

Jumlah - - - -
Tabel Perhitungan Saluran Gendong

Galian Pasangan Batu Kali Plesteran


Panjang Kopor Badan Pasangan
No Sta ke Sta Lebar Tinggi Volume Volume Hor. Ver. Volume Ket.
Lebar Tinggi Lb Atas Lb Bawah Tinggi Jumlah
m m m m³ m m m m m buah m³ m m m²
a b c d e h i j k l m n o p q r s

Jumlah - - - -
TIME SCHEDULE

Kegiatan : Urusan Peningkatan PSU Lingkungan


Pekerjaan : Peningkatan Fasilitas Lingkungan Permukiman Kawasan Perumahan Belibis II RT 01 / RW 06 Kel. Kampung Jawa
Lokasi : Kota Solok
T.A : 2021

BOBOT WAKTU PELAKSANAAN


NO URAIAN PEKERJAAN 1 2 3 KET
(%) 1 2 3 4 5 6 7 8 9

A - 100%
I Biaya K3 Konstruksi 0.585 0.585

B Pekerjaan Jalan Lingkungan


I Pekerjaan Pendahuluan 0.101 0.101

II Pekerjaan Jalan 32.356 4.622 4.622 4.622 4.622 4.622 4.622 4.622

C Pekerjaan Saluran
I Pekerjaan Pendahuluan 1.096 0.183 0.183 0.183 0.183 0.183 0.183 0%

Jumlah (%) 34.138 0.686 4.622 4.622 4.805 4.805 4.805 4.805 4.805 0.183
Rencana
Kumulatif (%) - 0.686 5.308 9.931 14.736 19.540 24.345 29.150 33.955 34.138

Jumlah (%)
Realisasi
Jumlah (%)
Deviasi

JANGKA WAKTU PELAKSANAAN 60 (Enam puluh) HARI KALENDER

Solok,
Juni 2021
Dibuat Oleh
Konsultan Perencana
PT. Multikarya Interplan Konsultan

Ir. NOFITA HARWIN, MT, MM


Direktur