I UPAH
1 Pekerja Hari 70,000.00
2 Mandor Hari -
3 Kepala Tukang Hari 95,000.00
4 Tukang Kayu Hari 85,000.00
5 Tukang Batu Hari 85,000.00
6 Tukang Cat Hari 85,000.00
7 Tukang Listrik Hari 85,000.00
8 Tukang Besi Hari 85,000.00
9 Tukang Masak Aspal Hari 85,000.00
10 Tukang Lebur Aspal Hari 85,000.00
11 Pekerja Bongkar Siram Hari 70,000.00
12 Penjaga Malam Hari 70,000.00
13 Sopir Hari 85,000.00
14 Pembantu Sopir Hari 65,000.00
15 Operator Terlatih Hari 100,000.00
16 Operator Semi Terlatih Hari 75,000.00
17 Mekanik Hari 100,000.00
II BAHAN
A BAHAN BATU KALI BELAH / BATU PECAH
1 Batu Belah 15/20 / Batu Gunung M3 150,000.00
2 Batu Pecah 0.5-1 cm (mesin) M3 245,000.00
3 Batu Pecah 1-2 cm (mesin) M3 236,000.00
4 Batu Pecah 2-3 cm (mesin) M3 228,000.00
5 Batu Pecah 3-4 cm (mesin) M3 226,000.00
6 Batu Pecah 2/3 cm (manual) M3 160,000.00
7 Batu Pecah 3/4 cm (manual) M3 160,000.00
8 Batu Pecah 5/7 cm (manual) M3 156,750.00
9 Batu Pecah 5/10 cm (manual) M3 156,750.00
C BAHAN PASIR
1 Pasir Pasang M3 157,500.00
2 Pasir Beton M3 157,500.00
3 Pasir Urug M3 150,000.00
4 Cadas M3 40,000.00
5 Tasirtu M3 152,500.00
6 Sirtu M3 115,000.00
7 Abu Batu M3 102,000.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 1 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 2 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
D BAHAN DINDING
1 Bata Merah Type 1 Bh 800.00
2 Hollowbrick (HB) 15 Bh 2,700.00
3 Hollowbrick (HB) 10 Bh 2,400.00
4 Roster/Terawang (bata) Bh 8,250.00
5 Roster Keramik Bh 48,300.00
6 Batako Bh 2,150.00
E BAHAN SEMEN
1 Semen Portland Type I Kg 1,330.00
2 Semen Portland (PCC) Kg 1,220.00
3 Semen Warna Kg 9,300.00
4 Semen Nat Kg 7,000.00
F BAHAN KAYU
1 Kayu Papan Klas I M3 3,700,000.00
2 Kayu Balok Klas I M3 3,600,000.00
3 Kayu Papan Klas II M3 2,900,000.00
4 Kayu Balok Klas II M3 2,800,000.00
5 Kayu Papan Klas III M3 2,300,000.00
6 Kayu Balok Klas III M3 2,300,000.00
7 Kayu Papan Klas IV M3 2,300,000.00
8 Kayu Bekisting M3 2,200,000.00
9 Papan Lamberzering Lbr 16,000.00
10 Les Kayu Profil D1 M' 4,000.00
11 Kayu Tiang Pancang (dia > 10 cm) M3 1,800,000.00
12 Kayu Api M3 1,500,000.00
13 Dolken Kayu Galam dia. 8-10/4 m Btg 15,000.00
G BAHAN PAKU
1 Paku Biasa 1/2"-5" Kg 15,600.00
2 Paku Triplek Kg 17,000.00
3 Paku Seng Kg 16,500.00
4 Paku Atap Anti Karat Kg 30,600.00
5 Sekrup Kg 8,000.00
6 Lem Kayu Kg 16,100.00
H BAHAN PIPA
PIPA GIP
1 GIP Ø 1/2" M' 18,300.00
2 GIP Ø 3/4" M' 23,000.00
3 GIP Ø 1" M' 26,300.00
4 GIP Ø 1 1/2" M' 38,000.00
5 GIP Ø 2" M' 41,600.00
6 GIP Ø 3" M' 77,500.00
7 GIP Ø 4" M' 118,000.00
8 PVC Ø 1/2" AW M' 5,050.00
9 PVC Ø 3/4" AW M' 6,600.00
10 PVC Ø 1" AW M' 8,750.00
11 PVC Ø 1 1/2" AW M' 14,250.00
12 PVC Ø 2" AW M' 19,500.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 3 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
13 PVC Ø 3" AW M' 36,250.00
14 PVC Ø 4" AW M' 55,650.00
15 Kran 1/2" Bh 5,500.00
16 Kran 3/4" Bh 20,600.00
17 TBA Bh 3,000.00
I BAHAN PLAFOND
1 Multiplek Tebal 18 mm Lbr 257,500.00
2 Multiplek Tebal 15 mm Lbr 218,300.00
3 Multiplek Tebal 12 mm Lbr 171,600.00
4 Multiplek Tebal 9 mm Lbr 125,000.00
5 Multiplek Tebal 6 mm Lbr 90,000.00
6 Triplek Tebal 4 mm Lbr 69,100.00
7 Triplek Tebal 3 mm Lbr 51,000.00
8 Triplek Jati Lbr 80,750.00
9 Triplek Sungkai Lbr 81,750.00
10 Teak Wood Tebal 4 mm Lbr 86,000.00
11 Gypsum Board tebal 9 mm Lbr 67,600.00
12 Gypsum Board tebal 6 mm Lbr 44,000.00
13 Formika Lbr 88,000.00
14 GRC Board tebal 4 mm Lbr 71,500.00
15 GRC Board tebal 6 mm Lbr 122,300.00
16 GRC Board tebal 8 mm m' 20,833.00
17 List Profil Gypsum M' 22,600.00
18 Compound Gypsum Kg 4,100.00
19 Compound GRC Kg 4,000.00
20 Papan Listplank Zincalume M' 23,125.00
21 Plafond PVC (Bermotif) M' 27,500.00
22 List PVC Btg 96,000.00
J BAHAN BESI DAN ALLUMINIUM
1 Kawat Berduri Rol 125,000.00
2 Kawat Beton Kg 15,600.00
3 Besi Beton Polos Kg 9,600.00
4 Besi Profil Kg 9,800.00
5 Besi Strip Kg 11,500.00
6 Kawat Nyamuk M2 18,000.00
7 Kawat Harmonika M2 15,000.00
8 Kawat Ayak M2 30,000.00
9 Besi Siku Kg 9,000.00
10 Besi Plat (2 mm) Lbr 260,000.00
11 Pagar BRC (tinggi 0,90 m) Lbr 175,000.00
12 Pagar BRC (tinggi 1,20 m) Lbr 200,000.00
13 Truss C-75, 0.75 M' 13,300.00
14 Truss C-75, 0.60 M' 12,000.00
15 Reng R.33-0.45 M' 6,500.00
16 Baut/Screw Bh 400.00
17 Dynabolt Bh 2,200.00
18 Profil Alluminium 4" (Ex. Alexindo) warna Silver M' 66,667.00
19 Profil Alluminium 3" (Ex. Alexindo) warna Silver M' 50,000.00
20 Profil Alluminium 4" (Ex. Alexindo) warna Hitam/Coklat M' 75,000.00
21 Profil Alluminium 3" (Ex. Alexindo) warna Hitam/Coklat M' 58,333.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 4 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
22 Profil Alluminium 4" (Ex. Alexindo) warna Coating Powder M' 86,667.00
23 Profil Alluminium 3" (Ex. Alexindo) warna Coating Powder M' 66,667.00
24 Skrup Fixer Bh 500.00
25 Sealant Tube 27,500.00
26 Furing Channel M' 3,100.00
27 Hollow 4x4 cm Btg 28,500.00
28 Hollow 2x4 cm Btg 21,500.00
29 Kawat Las Listrik Kg 20,000.00
30 Sewa Alat Las Listrik (Diesel) Jam 37,500.00
31 Kanopi Polycarbonat (Ex. Twinlite) Rangka Besi Hollow M2 550,000.00
32 Rolling Door Alluminium (ukuran 0,8 mm) M2 600,000.00
33 Folding Door/Gate (ukuran 0,5 mm) M2 500,000.00
34 Folding Door/Gate (ukuran 0,4 mm) M2 400,000.00
35 Pagar Besi Rangka Besi Stallbus Hollow M2 400,000.00
36 Arm Stay Bh 15,000.00
37 Rambucis/Slot Bh 47,500.00
K BAHAN ATAP
1 Atap Seng BJLS 20 K Lbr 43,125.00
2 Atap Seng BJLS 28 K Warna Lbr 58,125.00
3 Genteng Metal Single 5 Daun (1x5) Tebal 0,4 mm (Multiroof) Lbr 45,000.00
4 Genteng Metal Single 4 Daun (1x4) Tebal 0,3 mm (Sakuraroof) Lbr 25,250.00
5 Genteng Metal Double 10 Daun (2x5) Tebal 0,4 mm (Multiroof) Lbr 74,500.00
6 Genteng Metal Double 8 Daun (2x4) Tebal 0,3 mm (Sakuraroof) Lbr 43,000.00
7 Atap Plastik Warna Putih Arselic Lbr 80,000.00
8 Atap Plastik Fiber Glass Lbr 51,600.00
9 Nok Stel Gelombang Lbr 20,000.00
10 Seng Plat bjls 20 Lbr 46,250.00
11 Seng Plat bjls 28 Lbr 62,700.00
12 Perabung Atap Genteng Metal Single (multiroof) Lbr 29,000.00
13 Perabung Atap Genteng Metal Single (sakuraroof) Lbr 23,000.00
14 Bola-bola Atap Genteng Metal (multiroof) Bh 25,500.00
15 Bola-bola Atap Genteng Metal (sakuraroof) Bh 23,300.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 5 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
18 Granit uk. 60 x 60 cm Bh 172,500.00
19 Batu Alam Andesit M2 180,000.00
20 Batu Alam Candi M2 175,000.00
21 Batu Tempel Hitam M2 195,000.00
22 Paving Blok Tebal 8 Bh 3,000.00
23 Ijuk Kg 11,000.00
M BAHAN KACA
1 Kaca Polos Tebal 3 mm M2 66,600.00
2 Kaca Polos Tebal 5 mm M2 94,300.00
3 Rayben Tebal 3 mm M2 77,700.00
4 Rayben Tebal 5 mm M2 105,500.00
5 Kaca Tempered Tebal 8 mm M2 650,000.00
6 Kaca Tempered Tebal 12 mm M2 800,000.00
O BAHAN CAT
1 Cat Dasar Kayu Kg 26,800.00
2 Plamur Kayu Kg 21,450.00
3 Cat Kayu Kg 46,300.00
4 Cat Besi Kg 46,300.00
5 Menie Besi Kg 20,000.00
6 Menie Besi Kg 15,000.00
7 Cat Dasar Tembok Kg 17,500.00
8 Cat Tembok Catylac Kg 20,000.00
9 Alkali Kg 35,800.00
10 Cat Tembok Warna (weathershield) Kg 90,000.00
11 Cat Ultra Plitur Kg 50,000.00
12 Cat Melanin (Clear) Kg 49,000.00
13 Dempul/Plamir Tembok Kg 15,000.00
14 Dempul Kayu Kg 21,450.00
15 Vernis Ltr 42,500.00
16 Wood Filler Ltr 36,000.00
17 Sanding Siller Ltr 57,500.00
18 Wood Stain Ltr 60,000.00
19 Thinner Ltr 19,000.00
20 Minyak Bekisting Kg 1,500.00
21 Amplas Lbr 3,000.00
22 Kuas Bh 20,000.00
23 Waterproofing Kg 60,000.00
24 Soda Api Kg 20,000.00
25 Sabun Kg 10,000.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 6 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
P BAHAN MINYAK DAN PELUMAS
1 Solar Industri Ltr 10,800.00
2 Bensin/Premium Ltr 6,600.00
3 Pelumas Ltr 27,500.00
4 Aspal Kg 12,000.00
5 Air Ltr 12.50
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 7 dari 65
NO URAIAN SATUAN HARGA SATUAN (Rp.)
Q BAHAN SANITAIR
1 Kloset Jongkok Keramik (American Standart) Bh 243,000.00
2 Kloset Duduk pakai tangki siram (American Standart) Set 1,610,000.00
3 Kloset Duduk tanpa tangki siram (American Standart) Set 625,000.00
4 Urinoir Keramik Bh 950,000.00
5 Wastafel Gantung Keramik Bh 487,500.00
6 Bak Mandi Fibreglass 70x70x66 cm Bh 337,500.00
7 Tangki Air Fibre Kap. 1000 L Bh 1,383,000.00
8 Pelampung Otomatis 1/2 Bh 99,000.00
9 Pompa Air Bh 440,000.00
Daftar Harga Satuan Upah dan Bahan TA. 2015 Hal. 8 dari 65
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
BIDANG CIPTA KARYA
TAHUN ANGGARAN 2015
KOTA SOLOK
a b c d e f
I PEKERJAAN PERSIAPAN
II PEKERJAAN TANAH
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 9 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
4 1 M3 PENGURUGAN CADAS PADAT
0.3000 Pekerja Rp. 70,000.00 Rp. 21,000.00
0.0100 Mandor Rp. - Rp. -
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 10 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
2 1 M2 PEMASANGAN DINDING BATA MERAH (5X11X22) CM TEBAL 1/2 BATU
CAMPURAN SPESI 1 PC : 4 PP
0.3000 Pekerja Rp. 70,000.00 Rp. 21,000.00
0.1000 Tukang Batu Rp. 85,000.00 Rp. 8,500.00
0.0100 Kepala Tukang Rp. 95,000.00 Rp. 950.00
0.0150 Mandor Rp. - Rp. -
V PEKERJAAN PLESTERAN
4 1 M2 PEMASANGAN ACIAN
3.2500 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 3,965.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 11 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
VI PEKERJAAN KAYU
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 12 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
Dibulatkan Rp. 216,505.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 13 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
6 1 M2 PEMBUATAN DAN PEMASANGAN PINTU & JENDELA JALUSI KAYU KLAS I
0.0640 M3 Papan Kayu Klas I Rp. ### Rp. 236,800.00
0.5000 Kg Lem Kayu Rp. 16,100.00 Rp. 8,050.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 14 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
0.2400 Kepala Tukang Rp. 95,000.00 Rp. 22,800.00
0.0400 Mandor Rp. - Rp. -
Rp. 282,800.00 Rp. 151,858.00 Rp. 434,658.00
Overhead 5% Rp. -
Jumlah Rp. 434,658.00
Dibulatkan Rp. 434,658.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 15 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
5.6000 Kg Paku 12 cm Rp. 15,600.00 Rp. 87,360.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 16 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
0.0140 M3 Kaso-Kaso (5x7) cm Rp. ### Rp. 39,200.00
0.0360 M3 Reng (2x3) cm Rp. ### Rp. 100,800.00
0.2500 Kg Paku 5 cm dan 10 cm Rp. 15,600.00 Rp. 3,900.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 17 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
0.2500 Kg Paku 7 cm - 10 cm Rp. 15,600.00 Rp. 3,900.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 18 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
11 1 M PEMASANGAN LISTPLANK UKURAN (3x20) CM, KAYU KLAS II
0.0044 M3 Papan Kayu Klas II Rp. ### Rp. 12,760.00
0.1000 Kg Paku 5 cm dan 7 cm Rp. 15,600.00 Rp. 1,560.00
1 1 M3 MEMBUAT LANTAI KERJA BETON MUTU fc' = 7,4 MPa (K 100), SLUMP (3-6) CM, W/C = 0,87
230.0000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 280,600.00
0.6300 M3 Pasir Beton Rp. 157,500.00 Rp. 99,225.00
0.7600 M3 Kerikil Beton Rp. 146,000.00 Rp. 110,960.00
200.0000 Ltr Air Rp. 12.50 Rp. 2,500.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 19 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
2 1 M3 MEMBUAT BETON MUTU fc' = 14,5 MPa (K 175), SLUMP (12 + 2) CM, W/C = 0,66
A. MANUAL
326.0000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 397,720.00
0.5400 M3 Pasir Beton Rp. 157,500.00 Rp. 85,050.00
0.7600 M3 Kerikil Beton Rp. 146,000.00 Rp. 110,960.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
3 1 M3 MEMBUAT BETON MUTU fc' = 19,3 MPa (K 225), SLUMP (12 + 2) CM, W/C = 0,58
A. MANUAL
371.0000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 452,620.00
0.4900 M3 Pasir Beton Rp. 157,500.00 Rp. 77,175.00
0.7700 M3 Kerikil Beton Rp. 146,000.00 Rp. 112,420.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 20 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
6 1 Kg PEMASANGAN JARING KAWAT BAJA/WIRE MESH
1.0200 Kg Jaring Kawat Baja dilas Rp. 9,600.00 Rp. 9,792.00
0.0050 Kg Kawat Beton Rp. 15,600.00 Rp. 78.00
8 1 M2 PEMASANGAN BEKISTING UNTUK SLOOF, KOLOM PRAKTIS, BALOK PRAKTIS, PET BETON
0.0450 M3 Kayu Klas III Rp. ### Rp. 103,500.00
0.3000 Kg Paku 5 cm - 10 cm Rp. 15,600.00 Rp. 4,680.00
0.1000 Lt Minyak Bekisting Rp. 1,500.00 Rp. 150.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 21 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
10 1 M2 PEMASANGAN BEKISTING UNTUK BALOK
0.0400 M3 Kayu Klas III Rp. ### Rp. 92,000.00
0.4000 Kg Paku 5 cm - 12 cm Rp. 15,600.00 Rp. 6,240.00
0.2000 Lt Minyak Bekisting Rp. 1,500.00 Rp. 300.00
0.0180 m3 Balok Kayu Klas III Rp. ### Rp. 41,400.00
0.3500 Lbr Multiplek tebal 9 mm Rp. 125,000.00 Rp. 43,750.00
2.0000 Btg Dolken Kayu Galam dia. 8-10 cm,panjang 4 m Rp. 15,000.00 Rp. 30,000.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 22 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 23 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
2 1 M' PEMASANGAN LIST LANGIT-LANGIT KAYU PROFIL
1.0500 M' List Kayu Profil Rp. 4,000.00 Rp. 4,200.00
0.0100 Kg Paku Rp. 15,600.00 Rp. 156.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 24 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
Overhead 5% Rp. -
Jumlah Rp. 873,895.00
Dibulatkan Rp. 873,895.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 25 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
4 PEMASANGAN 1 M' PIPA PVC TIPE AW DIA. 1/2"
1.2000 M' Pipa PVC Rp. 5,050.00 Rp. 6,060.00
0.3500 Perlengkapan (35% Harga Pipa) Rp. 5,050.00 Rp. 1,767.50
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 26 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
9 PEMASANGAN 1 M' PIPA PVC TIPE AW DIA. 4'
1.2000 M' Pipa PVC Rp. 55,650.00 Rp. 66,780.00
0.3500 Perlengkapan (35% Harga Pipa) Rp. 55,650.00 Rp. 19,477.50
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 27 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
Dibulatkan Rp. 2,340.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 28 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
4 1 M2 PEMASANGAN TERALI BESI STRIP (2x3) mm
6.1770 Kg Besi Strip Rp. 11,500.00 Rp. 71,035.50
27.0800 Cm Pengelasan Rp. 2,340.00 Rp. 63,367.20
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 29 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
8 1 M' PEMASANGAN KUZEN PINTU ALLUMINIUM 4" (COATING POWDER)
1.1000 M' Profil Alluminium 4" (Ex. Alexindo) warna Coating Po Rp. 86,667.00 Rp. 95,333.70
2.0000 Bh Skrup Fixer Rp. 500.00 Rp. 1,000.00
0.0600 Tub Sealant Rp. 27,500.00 Rp. 1,650.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 30 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
12 1 M2 PASANG JENDELA KACA RAYBEN 5 mm DENGAN RANGKA ALUMUNIUM HITAM/COKLAT
4.4000 M' Profil Alluminium 4" (Ex. Alexindo) warna Hitam/CoklaRp. 86,667.00 Rp. 381,334.80
1.1000 M2 Kaca Reyben 5 mm Rp. 105,500.00 Rp. 116,050.00
2.0000 bh Arm Stay Rp. 47,500.00 Rp. 95,000.00
2.0000 bh Grendel Jendela Rp. 22,500.00 Rp. 45,000.00
1.0000 bh Rambucis/Slot Rp. 15,000.00 Rp. 15,000.00
0.2700 Tub Sealant Rp. 27,500.00 Rp. 7,425.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 31 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 32 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
16 1 M2 PEMASANGAN RANGKA BAJA TRUSS C-75,075 DINDING PARTISI Uk. 60x120 CM,
5.5000 M' Main Truss C-75, 0.75 Rp. 13,300.00 Rp. 73,150.00
20.0000 bh Baut (roof batten screw) Rp. 400.00 Rp. 8,000.00
0.7500 Lbr Grc Tbl. 6 mm Rp. 122,300.00 Rp. 91,725.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 33 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
2 1 BUAH PEMASANGAN ENGSEL PINTU
1.0000 Bh Engsel Pintu Rp. 11,300.00 Rp. 11,300.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 34 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
3 1 M2 PEMASANGAN LANTAI KERAMIK POLOS UKURAN (30X30) CM
11.8700 Bh Ubin Keramik Rp. 5,000.00 Rp. 59,350.00
10.0000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 12,200.00
0.0450 M3 Pasir Pasang Rp. 157,500.00 Rp. 7,087.50
1.5000 Kg Semen Warna Rp. 9,300.00 Rp. 13,950.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 35 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
7 1 M2 PEMASANGAN LANTAI GRANIT UKURAN (60X60) CM
3.0000 Bh Granit Rp. 57,500.00 Rp. 172,500.00
10.0000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 12,200.00
0.0450 M3 Pasir Pasang Rp. 157,500.00 Rp. 7,087.50
1.5000 Kg Semen Warna Rp. 9,300.00 Rp. 13,950.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 36 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
11 1 M2 PEMASANGAN DINDING KERAMIK POLOS UKURAN (25X40) CM
10.0000 Bh Keramik Rp. 7,500.00 Rp. 75,000.00
9.3000 Kg Semen Portland (PCC) Rp. 1,220.00 Rp. 11,346.00
0.0180 M3 Pasir Pasang Rp. 157,500.00 Rp. 2,835.00
1.9400 Kg Semen Warna Rp. 9,300.00 Rp. 18,042.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 37 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
3 1 M2 PENGECATAN TEMBOK BARU (1 Lapis Plamir, 1 Lapis
Cat Dasar, 2 Lapis Cat Penutup)
0.1000 Kg Plamir Rp. 15,000.00 Rp. 1,500.00
0.1000 Kg Cat Dasar Rp. 17,500.00 Rp. 1,750.00
0.2600 Kg Cat Penutup 2 Kali Rp. 20,000.00 Rp. 5,200.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2015 Hal. 38 dari 65
REKAPITULASI DAFTAR ANALISA HARGA SATUAN PEKERJAAN
TAHUN ANGGARAN 2015
HARGA SATUAN
NO URAIAN
SATUAN (Rp.)
1 2 3 4
I PEKERJAAN PERSIAPAN
1 Membersihkan Lapangan dan Perataan M2 7,000.00
2 Bongkaran Beton Bertulang M3 466,690.00
3 Bongkaran Dinding Tembok Bata Merah M3 466,690.00
4 Pengukuran dan Pemasangan Bouwplank M' 54,462.00
5 Pagar Sementara dari Seng Gelombang, Tinggi 2,00 m M' 265,087.00
II PEKERJAAN TANAH
1 Galian Tanah Biasa Sedalam 1 Meter M3 52,500.00
2 Galian Tanah Biasa Sedalam 2 Meter M3 63,000.00
3 Galian Tanah Biasa Sedalam 3 Meter M3 73,500.00
4 Galian Tanah Keras Sedalam 1 Meter M3 70,000.00
5 Galian Tanah Cadas Sedalam 1 Meter M3 105,000.00
6 Galian Tanah Lumpur Sedalam 1 Meter M3 84,000.00
7 Stripping Tebing Setinggi 1 Meter M3 3,500.00
8 Membuang Tanah Sejauh 15 M' M3 23,100.00
9 Urugan Kembali Galian M3 17,500.00
10 Pemadatan Tanah (Per 20 cm) M3 35,000.00
11 Urugan Pasir Urug M3 201,000.00
12 Mengurung Sirtu Padat Untuk Peninggian Lantai Bangunan M3 155,500.00
13 Urugan Cadas M3 69,000.00
V PEKERJAAN PLESTERAN
1 Plesteran 1 Pc : 1 Pp, Tebal 15 mm M2 56,609.00
2 Plesteran 1 Pc : 2 Pp, Tebal 15 mm M2 50,798.00
3 Plesteran 1 Pc : 3 Pp, Tebal 15 mm M2 48,284.00
4 Plesteran 1 Pc : 4 Pp, Tebal 15 mm M2 46,567.00
5 Plesteran 1 Pc : 5 Pp, Tebal 15 mm M2 45,594.00
6 Plesteran 1 Pc : 6 Pp, Tebal 15 mm M2 44,815.00
7 Plesteran 1 Pc : 2 Pp, Tebal 20 mm M2 67,783.00
8 Plesteran 1 Pc : 3 Pp, Tebal 20 mm M2 64,431.00
9 Plesteran 1 Pc : 4 Pp, Tebal 20 mm M2 62,090.00
10 Plesteran 1 Pc : 5 Pp, Tebal 20 mm M2 60,845.00
11 Plesteran 1 Pc : 6 Pp, Tebal 20 mm M2 59,753.00
12 Berapen 1 Pc : 5 Pp, Tebal 15 mm M2 28,054.00
13 Plesteran Skoning 1 Pc : 2 Pp, Lebar 10 mm M 46,057.00
14 Plesteran Ciprat 1 Pc : 2 Pp M2 36,665.00
15 Finishing Siar Pasangan Dinding Bata Merah (=20 M') M2 21,426.00
16 Finishing Siar Pasangan Dinding Conblock Ekspose (=8 M') M2 10,207.00
17 Finishing Siar Pasangan Batu Kali Adukan 1 Pc : 2 Pp M2 44,799.00
18 Acian M2 27,415.00
VI PEKERJAAN KAYU
1 Pasang Kuzen Pintu dan Jendela, Kayu Klas I M3 6,470,100.00
2 Pasang Kuzen Pintu dan Jendela, Kayu Klas II M3 5,516,600.00
3 Pasang Pintu Klamp Standar. Kayu Klas II M2 240,505.00
4 Pasang Pintu Klamp Sederhana. Kayu Klas III M2 216,505.00
5 Pasang Daun Pintu Panel, Kayu Klas I M2 509,550.00
6 Pasang Daun Pintu Panel, Kayu Klas II M2 477,550.00
7 Pasang Pintu dan Jendela Kaca, Kayu Klas I M2 376,430.00
8 Pasang Pintu dan Jendela Kaca, Kayu Klas II M2 357,230.00
9 Pasang Pintu dan Jendela Jalusi, Kayu Klas I M2 598,350.00
10 Pasang Pintu dan Jendela Jalusi, Kayu Klas II M2 547,150.00
11 Pasang Daun Pintu Kayu Lapis (Plywood) Rangkap, M2 397,568.00
Rangka Tertutup Kayu Klas II (Lebar Sampai 90 cm)
12 Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas I M2 455,138.00
13 Pasang Pintu Plywood Rangkap, Rangka Expose Kayu Klas II M2 434,658.00
14 Pasang Jalusi Kuzen, Kayu Klas I M2 460,240.00
HARGA SATUAN
NO URAIAN
SATUAN (Rp.)
15 Pasang Jalusi Kuzen, Kayu Klas II M2 412,240.00
16 Pasang Teakwood Rangkap, Rangka Expose Kayu Klas I M2 466,598.00
17 Pasang Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Klas II M2 516,323.00
18 Pasang Konstruksi Kuda-Kuda Konvensional, Kayu Klas I Bentang 6 M M3 5,633,860.00
19 Pasang Konstruksi Kuda-Kuda Konvensional, Kayu Klas II Bentang 6 M M3 4,753,860.00
20 Pasang Konstruksi Kuda-Kuda Expose, Kayu Klas I M3 6,948,310.00
21 Pasang Konstruksi Kuda-Kuda Expose, Kayu Klas II M3 5,988,310.00
22 Pasang Konstruksi Gordeng, Kayu Klas II M3 5,667,750.00
23 Pasang Rangka Atap Genteng Keramik, Kayu Klas II M2 160,350.00
24 Pasang Rangka Atap Genteng Beton, Kayu Klas II M2 219,150.00
25 Pasang Rangka Atap Sirap, Kayu Klas II M2 59,829.00
26 Pasang Rangka Langit-Langit (60x120) cm, Kayu Klas II M2 78,260.00
27 Pasang Rangka Langit-Langit (50x100) cm, Kayu Klas II M2 85,090.00
28 Pasang Rangka Langit-Langit (60x60) cm, Kayu Klas II M2 91,890.00
29 Pasang Listplank Ukuran (3x20) cm, Kayu Klas II M 40,220.00
30 Pasang Listplank Ukuran (3x30) cm, Kayu Klas II M 58,580.00
31 Pasang Rangka Dinding Pemisah (60x120) cm, Kayu Klas II M2 136,565.00
32 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Klas II M2 219,541.00
33 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Klas II M2 222,682.00
34 Pasang Dinding Lambriziring Dari Papan Kayu Klas II M2 235,160.00
0
0 0
0 0
0 0
0 0
DAFTAR ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
TAHUN ANGGARAN 2013
a b c d e f
1 1 M3 MEMBUAT BETON MUTU fc' = 7,4 MPa (K 100), SLUMP (12 + 2) CM, W/C = 0,87
247.0000 Kg Semen Portland Rp. 1,330.00 Rp. 328,510.00
0.6200 M3 Pasir Beton Rp. 157,500.00 Rp. 97,650.00
0.7400 M3 Split Rp. 228,000.00 Rp. 168,720.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
2 1 M3 MEMBUAT BETON MUTU fc' = 9,8 MPa (K 125), SLUMP (12 + 2) CM, W/C = 0,78
276.0000 Kg Semen Portland Rp. 1,330.00 Rp. 367,080.00
0.5900 M3 Pasir Beton Rp. 157,500.00 Rp. 92,925.00
0.7500 M3 Kerikil Beton Rp. 228,000.00 Rp. 171,000.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
3 1 M3 MEMBUAT BETON MUTU fc' = 12,2 MPa (K 150), SLUMP (12 + 2) CM, W/C = 0,72
299.0000 Kg Semen Portland Rp. 1,330.00 Rp. 397,670.00
0.5700 M3 Pasir Beton Rp. 157,500.00 Rp. 89,775.00
0.7500 M3 Kerikil Beton Rp. 228,000.00 Rp. 171,000.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
4 1 M3 MEMBUAT BETON MUTU fc' = 14,5 MPa (K 175), SLUMP (12 + 2) CM, W/C = 0,66
326.0000 Kg Semen Portland Rp. 1,330.00 Rp. 433,580.00
0.5400 M3 Pasir Beton Rp. 157,500.00 Rp. 85,050.00
0.7600 M3 Kerikil Beton Rp. 228,000.00 Rp. 173,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 45 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
5 1 M3 MEMBUAT BETON MUTU fc' = 16,9 MPa (K 200), SLUMP (12 + 2) CM, W/C = 0,61
352.0000 Kg Semen Portland Rp. 1,330.00 Rp. 468,160.00
0.5200 M3 Pasir Beton Rp. 157,500.00 Rp. 81,900.00
0.7600 M3 Kerikil Beton Rp. 228,000.00 Rp. 173,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
6 1 M3 MEMBUAT BETON MUTU fc' = 19,3 MPa (K 225), SLUMP (12 + 2) CM, W/C = 0,58
371.0000 Kg Semen Portland Rp. 1,330.00 Rp. 493,430.00
0.4900 M3 Pasir Beton Rp. 157,500.00 Rp. 77,175.00
0.7700 M3 Kerikil Beton Rp. 228,000.00 Rp. 175,560.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
7 1 M3 MEMBUAT BETON MUTU fc' = 21,7 MPa (K 250), SLUMP (12 + 2) CM, W/C = 0,56
384.0000 Kg Semen Portland Rp. 1,330.00 Rp. 510,720.00
0.4900 M3 Pasir Beton Rp. 157,500.00 Rp. 77,175.00
0.7600 M3 Kerikil Beton Rp. 228,000.00 Rp. 173,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
8 1 M3 MEMBUAT BETON MUTU fc' = 24,0 MPa (K 275), SLUMP (12 + 2) CM, W/C = 0,53
406.0000 Kg Semen Portland Rp. 1,330.00 Rp. 539,980.00
0.4800 M3 Pasir Beton Rp. 157,500.00 Rp. 75,600.00
0.7600 M3 Kerikil Beton Rp. 228,000.00 Rp. 173,280.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
9 1 M3 MEMBUAT BETON MUTU fc' = 26,4 MPa (K 300), SLUMP (12 + 2) CM, W/C = 0,52
413.0000 Kg Semen Portland Rp. 1,330.00 Rp. 549,290.00
0.4800 M3 Pasir Beton Rp. 157,500.00 Rp. 75,600.00
0.7500 M3 Kerikil Beton Rp. 228,000.00 Rp. 171,000.00
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 46 dari 65
No URAIAN H. SATUAN UPAH BAHAN JUMLAH
a b c d e f
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
10 1 M3 MEMBUAT BETON MUTU fc' = 28,8 MPa (K 325), SLUMP (12 + 2) CM, W/C = 0,49
439.0000 Kg Semen Portland Rp. 1,330.00 Rp. 583,870.00
0.4700 M3 Pasir Beton Rp. 157,500.00 Rp. 74,025.00
0.7400 M3 Kerikil Beton Rp. 228,000.00 Rp. 168,720.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
11 1 M3 MEMBUAT BETON MUTU fc' = 31,2 MPa (K 350), SLUMP (12 + 2) CM, W/C = 0,48
448.0000 Kg Semen Portland Rp. 1,330.00 Rp. 595,840.00
0.4700 M3 Pasir Beton Rp. 157,500.00 Rp. 74,025.00
0.7400 M3 Kerikil Beton Rp. 228,000.00 Rp. 168,720.00
215.0000 Ltr Air Rp. 12.50 Rp. 2,687.50
1.0000 Ls Sewa Pompa Rp. 41,000.00 Rp. 41,000.00
Ir. Ardy Syafwan Warfendi Boy, S.T. Ir. Nofi Hendri, M.T.
NIP. 19570513 198901 1 001 NIP. 19570831 198103 1 003 NIP. 19661115 199308 1 001
Daftar Analisa Harga Satuan Pekerjaan Konstruksi Kota Solok Tahun 2012 Hal. 47 dari 65
PERHITUNGAN VOLUME PEKERJAAN
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG ADMINISTRASI DAN PERKANTORAN SMKN 3 SOLOK DAN PERABOTNYA
LOKASI : SMK NEGERI 3 SOLOK - KOTA SOLOK
TAHUN : 2015
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
A. PEMBANGUNAN RKB SMK NEGERI 3 SOLOK
I. PEKERJAAN PEDAHULUAN
1 Pek. Pasang Plank Proyek 1.00### = 1.00 1.00 ls
2 Pek. Kolom Uk. 11/11 Mutu Beton K 225 3.10 x 0.11 x 0.11 x 11.00 = 0.41 0.41 m3
Bekisting Kolom 34.10 x 0.44 = 15.00 15.00 m2
Pembesian 37.40 x 4.00 x 0.62 = 92.23 114.10 kg
198.00 x 1.00 = 198.00 x 0.28 x 0.39 = 21.87
jumlah + 114.10
3 Pek. Ring Balok Uk. 25/40 ( B1 ) Mutu Beton K 175 119.00 x 0.25 x 0.40 = 11.90 11.90 m3
Bekisting Balok 119.00 x 1.05 = 124.95 124.95 m2
Pembesian 119.00 x 7.00 x 0.89 = 739.50 1,021.98 kg
628.00 x 1.00 = 628.00 x 1.14 x 0.39 = 282.47
jumlah + 1,021.98
4 Pek. Ring Balok Uk. 15/25
Beton Mutu K-225 14.50 x 0.15 x 0.25 = 0.54 0.54 m3
Bekisting 14.50 x 0.65 = 9.43 9.43 m2
Pembesian 14.50 x 4.00 x 0.89 = 51.49 73.46 kg
87.00 x 1.00 = 87.00 x 0.64 x 0.39 = 21.97
jumlah + 73.46
5 Pek. Balok Kuzen Uk. 10/10 Pembesian 49.40 x 0.10 x 0.10 = 0.49 0.49 m3
Pas. Dinding Bata 1 : 2 49.40 x 0.30 = 14.82 14.82 m2
Pas. Dinding Bata 1 : 4 49.40 x 4.00 x 0.62 = 121.82 145.30 kg
248.00 x 1.00 = 248.00 x 0.24 x 0.39 = 23.48
jumlah + 145.30
Hal. 48 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
Jendela J2 1.60 x 1.80 = 2.88 x 2.00 = 5.76 m2
Jendela J3 1.68 x 1.20 = 2.02 x 2.00 = 4.03 m2
Jendela J4 1.68 x 0.58 = 0.97 x 3.00 = 2.92 m2
Ventilasi 1 0.60 x 1.21 = 0.73 x 4.00 = 2.90 m2
Pintu P2 1.80 x 0.60 = 1.08 x 5.00 = 5.40 m2
Pintu PJ I 2.00 x 0.80 = 1.60 x 5.00 = 8.00 m2
1.80 x 1.50 = 2.70 x 5.00 = 13.50 m2
Balok Kuzen 49.40 x 0.10 = 4.94 x 1.00 = 4.94
Ventilasi Closter beton 0.30 x 0.30 = 0.09 x 51.00 = 4.59 m2
Jumlah + 77.25 m2
Luas Pas. Bata 195.67 - 77.25 = 118.42 m2
Hal. 49 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
c Pembesian Pembesian 9.50 x 7.00 x 0.62 = 41.00 65.10 kg
65.00 x 1.00 = 65.00 x 0.94 x 0.39 = 24.11
jumlah + 65.10
Hal. 50 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
3 Pek.Balok 15/20
a Beton Mutu K-225 Mutu Beton K 225 11.65 x 0.15 x 0.20 = 0.35 0.35 m3
b Bekisting Bekisting Sloof 11.65 x 0.40 = 4.66 4.66 m2
c Pembesian Pembesian 11.75 x 4.00 x 0.89 = 41.72 56.64 kg
70.00 x 1.00 = 70.00 x 0.54 x 0.39 = 14.91
4 Pek.List Plank Beton 10/60 jumlah + 56.64
a Beton Mutu K-225 Mutu Beton K 225 12.40 x 0.10 x 0.50 = 0.62 0.62 m3
b Bekisting Bekisting Balok 12.40 x 1.10 = 13.64 13.64 m2
c Pembesian Pembesian 12.40 x 4.00 x 0.62 = 30.58 60.94 kg
74.00 x 1.00 = 74.00 x 1.04 x 0.39 = 30.37
5 Pek.Plat Lantai Tbl.12 cm ( Teras ) jumlah + 60.94
a Beton Mutu K-225 Beton Mutu K-225 4.87 x 3.47 x 0.10 = 1.69 1.69 m3
b Bekisting Bekisting 4.87 x 3.47 = 16.90 = 16.90 16.90 m2
c Pembesian
Pembesian 40.96 x 4.87 x 0.62 = 122.98 x 0.39 = 48.52
26.79 x 3.72 x 0.62 = 61.43 x 0.39 = 24.24 72.76 kg
Jumlah Kg/m3 72.76
6 Pek. Kolom Uk. 11/11
a Beton Mutu K-225 Mutu Beton K 225 0.80 x 0.11 x 0.11 x 4.00 = 0.04 0.04 m3
b Bekisting Bekisting Kolom 3.20 x 0.44 = 1.41 1.41 m2
c Pembesian Pembesian 4.40 x 4.00 x 0.89 = 15.62 18.61 kg
27.00 x 1.00 = 27.00 x 0.28 x 0.39 = 2.98
jumlah + 18.61
7 Pek. Ring Blok 15/20
a Beton Mutu K-225 Mutu Beton K 225 11.85 x 0.15 x 0.20 = 0.36 0.36 m3
b Bekisting Bekisting Balok 11.85 x 0.55 = 6.52 6.52 m2
c Pembesian Pembesian 11.85 x 4.00 x 0.89 = 42.08 57.21 kg
71.00 x 1.00 = 71.00 x 0.54 x 0.39 = 15.13
jumlah + 57.21
9 Pas. Ventilasi Closter Beton Uk. 10/30 51.00 x 1.00 = 51.00 51.00 Bh
Hal. 51 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
b. Pek. Atap
1 Pas. Atap Genteng Metal Tebal 0.3 mm ( Double Tbl. 3 mm)
2 Pas. Nok Genteng Metal 11.55 + 7.52 + 7.52 + 7.52 + 7.52 77.53 m'
7.95 + 7.95 + 4.50 + 7.75 + 7.75 = 77.53
IV. PEKERJAAN PLAFOND
a. Pekerjaan Plafond Kantor
1 Pek. Kayu Rangka Plafond Kayu 120 x 60 Uk. 5/7 cm 16.35 x 9.85 = 161.05 x 1.00 = 161.05 223.02 m2
3.00 x 5.88 = 17.64 x 1.00 = 17.64
1.85 x 1.10 = 2.04 x 1.00 = 2.04
1.85 x 1.10 = 2.04 x 1.00 = 2.04
5.80 x 1.50 = 8.70 x 1.00 = 8.70
8.70 x 4.30 = 37.41 x 1.00 = 37.41
Jumlah + 228.87 m2
2 Pek. Pasang Plafond Multiplek Tbl. 6mm 16.35 x 9.85 = 161.05 x 1.00 = 161.05 223.37 m2
3.00 x 5.88 = 17.64 x 1.00 = 17.64
1.85 x 1.10 = 2.04 x 1.00 = 2.04
1.85 x 1.10 = 2.04 x 1.00 = 2.04
5.80 x 1.50 = 8.70 x 1.00 = 8.70
8.70 x 4.30 = 37.41 x 1.00 = 37.41
Jumlah + 228.87 m2
Hal. 52 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
Belakang 6.00 x 1.15 = 6.90
6.00 x 1.15 = 6.90
4.50 x 1.15 = 5.18
4.50 x 1.15 = 5.18
8.85 x 1.15 = 10.18
Samping Kiri 10.00 x 1.15 = 11.50
Samping Kanan 10.00 x 1.20 = 12.00
Km/Wc 1.50 x 1.80 = 2.70
1.50 x 1.80 = 2.70
1.75 x 1.10 = 1.93
1.85 x 1.35 = 2.50
1.85 x 1.35 = 2.50 Luas Kolom
Jumlah + 98.90 - 0.74 = 98.16 98.16 m2
2 Pek. Pasang Plafond Multiplek Tbl. 6mm Depan 23.00 x 1.30 = 29.90
Belakang 6.00 x 1.15 = 6.90
6.00 x 1.15 = 6.90
4.50 x 1.15 = 5.18
4.50 x 1.15 = 5.18
8.85 x 1.15 = 10.18
Samping Kiri 10.00 x 1.15 = 11.50
Samping Kanan 10.00 x 1.20 = 12.00
Km/Wc 1.50 x 1.80 = 2.70
1.50 x 1.80 = 2.70
1.75 x 1.10 = 1.93
1.85 x 1.35 = 2.50
1.85 x 1.35 = 2.50 Luas Kolom
Jumlah + 100.05 - 0.74 = 99.31 99.31 m2
Hal. 53 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
7.40 x 2.00 unit = 14.80
Hal. 54 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
J4 1.60 x 2.00 = 3.20
0.58 x 2.00 = 1.16
Jumlah + 4.36
4.36 x 3.00 unit = 13.08
PT 1
PT1 ( Pintu Dan Jendela ) 2.00 x 2.00 = 4.00
2.56 x 1.00 = 2.56
1.76 x 1.00 = 1.76
PT1 ( Jendela ) 1.00 x 10.00 = 10.00
2.50 x 4.00 = 10.00
Jumlah + 28.32
28.32 x 1.00 unit = 28.32
PT 2
2.00 x 2.00 = 4.00
0.80 x 1.00 = 0.80
2.60 x 1.00 = 2.60
PT2 (Pintu ) 2.00 x 3.00 = 6.00
1.60 x 2.00 = 3.20
PT2( Jendela ) 2.50 x 2.00 = 5.00
1.00 x 4.00 = 4.00
Jumlah + 25.60
25.60 x 1.00 unit = 25.60
PT 4
2.00 x 2.00 = 4.00
1.70 x 2.00 = 3.40
Jumlah + 7.40
7.40 x 1.00 unit = 7.40
PT 5
2.00 x 2.00 = 4.00
0.80 x 2.00 = 1.60
Jumlah + 5.60
5.60 x 1.00 unit = 5.60
PT 6
2.00 x 2.00 = 4.00
0.80 x 2.00 = 1.60
Jumlah + 5.60
5.60 x 1.00 unit = 5.60
Hal. 55 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
4 Pas. Pintu Aluminium + Kaca Tempret Tbl . 12 mm PJ1 2.00 x 1.00 = 2.00 2.00 unit
+ Floor hinge + Asesoris (Coklat) P1
5 Pas. Pintu Panil + Kaca Bening (Coklat) 10.00 x 1.00 = 10.00 10.00 unit
Hal. 56 dari 65
ANALISA HITUNGAN
NO. URAIAN PEKERJAAN VOLUME STN
Panjang Lebar Tinggi Jumlah
Km/Wc 2 1.85 x 1.75 = 3.24 x 1.00 = 3.24
1.25 x 1.60 = 2.00 x 1.00 = 2.00
1.60 x 1.75 = 2.80 x 1.00 = 2.80
0.60 x 1.75 = 1.05 x 1.00 = 1.05
Km/Wc 3 1.85 x 1.75 = 3.24 x 1.00 = 3.24
0.75 x 1.75 = 1.31 x 1.00 = 1.31
1.10 x 1.75 = 1.93 x 1.00 = 1.93
0.85 x 1.75 = 1.49 x 1.00 = 1.49
Km/Wc 3 1.40 x 1.50 = 2.10 x 1.00 = 2.10
Jumlah + 51.21
4 Pas. Stop Nozing Kantor 14.40 m'
0.80 x 1.00 = 0.80 x 10.00 = 8.00
1.60 x 1.00 = 1.60 x 4.00 = 6.40
Jumlah + 14.40
5 Pas. Bon - bon Keramik (KM/Wc) Km/Wc 0.58 x 1.00 = 0.58 x 5.00 = 2.90 2.90 m'
Km/wc
6 Pas. List Tello (Dinding Km/Wc ) Km/Wc 1 5.78 x 1.00 = 5.78 x 2.00 = 11.56 30.66 m'
4.10 x 1.00 = 4.10 x 1.00 = 4.10
3.95 x 1.00 = 3.95 x 1.00 = 3.95
Km/Wc 2 5.45 x 1.00 = 5.45 x 1.00 = 5.45
Km/Wc 3 5.60 x 1.00 = 5.60 x 1.00 = 5.60
Jumlah + 30.66
6 Pek. Pasang Lampu XL 18 Watt Setara Philips (Spiral) 10.00 x 1.00 10.00 ttk
7 Pek. Pasang Lampu LED 14 Watt Philip 18.00 x 1.00 18.00 ttk
Ir. FATMAWATI,MT
Direktris
Hal. 57 dari 65
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG ADMINISTRASI DAN PERKANTORAN SMKN 3 SOLOK DAN PERABOTNYA
LOKASI : SMK NEGERI 3 SOLOK - KOTA SOLOK
TAHUN : 2015
Ir. FATMAWATI,MT
Direktris
REKAPITULASI ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN GEDUNG SEKOLAH
PEKERJAAN : PEMBANGUNAN RUANG ADMINISTRASI DAN PERKANTORAN SMKN 3 SOLOK DAN PERABOTNYA
LOKASI : SMK NEGERI 3 SOLOK - KOTA SOLOK
TAHUN : 2015
Terbilang :
Err:511
FAUZI,ST.MT 2. ....................................
2
Sekretaris
Ir. FATMAWATI,MT
3. ....................................
RINI MARLINA,Ssi Direktris
3
Anggota
4. ....................................
FERDINAND ZALDI,ST
4
Anggota
5. ....................................
YESSI SEPIANTI,Amd
5
Anggota
Mengetahui Menyetujui
PENGGUNAN ANGGARAN (PA) PEJABAT PEMBUAT KOMITMEN (PPK)
KEPALA DINAS PENDIDIKAN KOTA SOLOK DINAS PENDIDIKAN KOTA SOLOK
### : #REF!
### : #REF!
### : #REF!
### : #REF!
### #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! 50%
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
### #REF! #REF! #REF! #REF!
Total #REF!
0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Bobot Rencana
0.00 #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
Bobot Realisasi
FATMAYANTI, MT
Direktris
PEMBESIAN BERAT PEMBESIAN
TIPE DIMENSI PANJANG CETAK BEGOL TULANGAN POKOK POKOK BEGOL TOTAL
TUL. POKOK
BEGOL P. BEGOL KAIT TTL JML
K3 0.20 x 0.20 25 15.0000 0.12 6 Bh 0.08 0.15 Cm (0.2+0.2-0.1) x2 0.05x2 0.80 6.67 25 x 0.12 x 0.12 x 100 x 0.6165 x 6 = 133.164 25 x 0.08 x 0.08 x 100 x 0.6165 x 0.80 x 6.67 = 52.608 185.772
KP 0.13 x 0.13 59.171597633 23.0769 0.12 4 Bh 0.08 0.15 Cm (0.13+0.13-0.1) x2 0.05x2 0.42 6.67 59.171597633 x 0.12 x 0.12 x 100 x 0.6165 x 4 = 210.1207101 59.171597633 x 0.08 x 0.08 x 100 x 0.6165 x 0.42 x 6.67 = 65.37088757 275.492
K2 0.75 x 0.15 8.8888888889 14.6667 0.16 22 Bh 0.10 0.15 Cm (0.75+0.15-0.1) x2 0.05x2 1.70 6.67 8.8888888889 x 0.16 x 0.16 x 100 x 0.6165 x 22 = 308.6336 8.8888888889 x 0.1 x 0.1 x 100 x 0.6165 x 1.70 x 6.67 = 62.10666667 370.740
KL2 0.75 x 0.15 4.94 8.1481 0.16 38 Bh 0.10 0.15 Cm (0.75+0.15-0.1) x2x2 0.05x4 3.40 6.67 4.9382716049 x 0.16 x 0.16 x 100 x 0.6165 x 38 = 296.1635556 4.9382716049 x 0.1 x 0.1 x 100 x 0.6165 x 3.40 x 6.67 = 69.00740741 365.171
K1 0.75 x 0.15 8.8888888889 14.6667 0.16 26 Bh 0.10 0.15 Cm (0.75+0.15-0.1) x2 0.05x2 1.70 6.67 8.8888888889 x 0.16 x 0.16 x 100 x 0.6165 x 26 = 364.7488 8.8888888889 x 0.1 x 0.1 x 100 x 0.6165 x 1.70 x 6.67 = 62.10666667 426.855
KL1 0.75 x 0.15 4.94 8.1481 0.16 46 Bh 0.10 0.15 Cm (0.75+0.15-0.1) x2x2 0.05x4 3.40 6.67 4.9382716049 x 0.16 x 0.16 x 100 x 0.6165 x 46 = 358.5137778 4.9382716049 x 0.1 x 0.1 x 100 x 0.6165 x 3.40 x 6.67 = 69.00740741 427.521
S1 0.20 x 0.25 20 13.0000 0.12 6 Bh 0.08 0.14 Cm (0.40+0.15-0.1) x2 0.05x2 0.80 7.14 20 x 0.12 x 0.12 x 100 x 0.6165 x 6 = 106.5312 20 x 0.08 x 0.08 x 100 x 0.6165 x 0.80 x 7.14 = 45.09257143 151.624
S2 0.45 x 0.25 8.8888888889 10.2222 0.16 6 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.30 6.67 8.8888888889 x 0.16 x 0.16 x 100 x 0.6165 x 6 = 84.1728 8.8888888889 x 0.08 x 0.08 x 100 x 0.6165 x 1.30 x 6.67 = 30.39573333 114.569
S3 0.40 x 0.15 16.666666667 15.8333 0.19 5 Bh 0.08 0.14 Cm (0.40+0.15-0.1) x2 0.05x2 1.00 7.14 16.666666667 x 0.19 x 0.19 x 100 x 0.6165 x 5 = 185.46375 16.666666667 x 0.08 x 0.08 x 100 x 0.6165 x 1.00 x 7.14 = 46.97142857 232.435
S4 0.65 x 0.30 5.1282051282 8.2051 0.19 14 Bh 0.10 0.15 Cm (0.65+0.30-0.1) x2 0.05x2 1.80 6.67 5.1282051282 x 0.19 x 0.19 x 100 x 0.6165 x 14 = 159.7841538 5.1282051282 x 0.1 x 0.1 x 100 x 0.6165 x 1.80 x 6.67 = 37.93846154 213.910
0.16 2 Bh 5.1282051282 x 0.16 x 0.16 x 100 x 0.6165 x 2 = 16.18707692
S5 0.45 x 0.25 8.8888888889 10.2222 0.16 11 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.30 6.67 8.8888888889 x 0.16 x 0.16 x 100 x 0.6165 x 11 = 154.3168 8.8888888889 x 0.08 x 0.08 x 100 x 0.6165 x 1.30 x 6.67 = 30.39573333 184.713
S6 0.60 x 0.30 5.5555555556 8.3333 0.16 10 Bh 0.10 0.20 Cm (0.60+0.30-0.1) x2 0.05x2 1.70 5.00 5.5555555556 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 87.68 5.5555555556 x 0.1 x 0.1 x 100 x 0.6165 x 1.70 x 5.00 = 29.1125 116.793
S7 0.45 x 0.25 8.8888888889 10.2222 0.19 12 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.30 6.67 8.8888888889 x 0.19 x 0.19 x 100 x 0.6165 x 12 = 237.3936 8.8888888889 x 0.08 x 0.08 x 100 x 0.6165 x 1.30 x 6.67 = 30.39573333 267.789
S8 0.30 x 0.15 22.222222222 16.6667 0.19 5 Bh 0.08 0.12 Cm (0.30+0.15-0.1) x2 0.05x2 0.80 8.33 22.222222222 x 0.19 x 0.19 x 100 x 0.6165 x 5 = 247.285 22.222222222 x 0.08 x 0.08 x 100 x 0.6165 x 0.80 x 8.33 = 58.45333333 305.738
S9 0.30 x 0.15 22.222222222 16.6667 0.19 8 Bh 0.08 0.12 Cm (0.30+0.15-0.1) x2 0.05x2 0.80 8.33 22.222222222 x 0.19 x 0.19 x 100 x 0.6165 x 8 = 395.656 22.222222222 x 0.08 x 0.08 x 100 x 0.6165 x 0.80 x 8.33 = 58.45333333 454.109
S10 0.40 x 0.20 12.5 12.5000 0.16 6 Bh 0.08 0.14 Cm (0.40+0.20-0.1) x2 0.05x2 1.10 7.14 12.5 x 0.16 x 0.16 x 100 x 0.6165 x 6 = 118.368 12.5 x 0.08 x 0.08 x 100 x 0.6165 x 1.10 x 7.14 = 38.75142857 157.119
SP 0.20 x 0.15 33.333333333 18.3333 0.12 4 Bh 0.08 0.18 Cm (0.20+0.15-0.1) x2 0.05x2 0.60 5.71 33.333333333 x 0.12 x 0.12 x 100 x 0.6165 x 4 = 118.368 33.333333333 x 0.08 x 0.08 x 100 x 0.6165 x 0.60 x 5.71 = 45.09257143 163.461
B1 0.40 x 0.15 16.666666667 15.8333 0.16 5 Bh 0.08 0.14 Cm (0.40+0.15-0.1) x2 0.05x2 1.00 7.14 16.666666667 x 0.16 x 0.16 x 100 x 0.6165 x 5 = 131.52 16.666666667 x 0.08 x 0.08 x 100 x 0.6165 x 1.00 x 7.14 = 46.97142857 178.491
B2 0.45 x 0.25 8.8888888889 10.2222 0.16 6 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.30 6.67 8.8888888889 x 0.16 x 0.16 x 100 x 0.6165 x 6 = 84.1728 8.8888888889 x 0.08 x 0.08 x 100 x 0.6165 x 1.30 x 6.67 = 30.39573333 114.569
B3 0.40 x 0.15 16.666666667 15.8333 0.19 5 Bh 0.08 0.14 Cm (0.40+0.15-0.1) x2 0.05x2 1.00 7.14 16.666666667 x 0.19 x 0.19 x 100 x 0.6165 x 5 = 185.46375 16.666666667 x 0.08 x 0.08 x 100 x 0.6165 x 1.00 x 7.14 = 46.97142857 232.435
B3 0.11 x 0.15 60.606060606 22.4242 0.12 4 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 0.42 6.67 60.606060606 x 0.12 x 0.12 x 100 x 0.6165 x 4 = 215.2145455 60.606060606 x 0.08 x 0.08 x 100 x 0.6165 x 0.42 x 6.67 = 66.95563636 282.170
S1 0.40 x 0.25 10 10.5000 0.16 8 Bh 0.10 0.15 Cm (0.40+0.25-0.1) x2 0.05x2 1.20 6.67 10 x 0.16 x 0.16 x 100 x 0.6165 x 8 = 126.2592 10 x 0.1 x 0.1 x 100 x 0.6165 x 1.20 x 6.67 = 49.32 175.579
K1 0.30 x 0.50 6.6666666667 7.3333 0.16 10 Bh 0.10 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 1.50 6.67 6.6666666667 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 105.216 6.6666666667 x 0.1 x 0.1 x 100 x 0.6165 x 1.50 x 6.67 = 41.1 146.316
KP 0.13 x 0.13 59.171597633 23.0769 0.10 4 Bh 0.08 0.15 Cm (0.13+0.13-0.1) x2 0.05x2 0.42 6.67 59.171597633 x 0.1 x 0.1 x 100 x 0.6165 x 4 = 145.9171598 59.171597633 x 0.08 x 0.08 x 100 x 0.6165 x 0.42 x 6.67 = 65.37088757 211.288
B1 0.15 x 0.20 33.333333333 16.6667 0.12 4 Bh 0.08 0.15 Cm (0.15+0.20-0.1) x2 0.05x2 0.60 6.67 33.333333333 x 0.12 x 0.12 x 100 x 0.6165 x 4 = 118.368 33.333333333 x 0.08 x 0.08 x 100 x 0.6165 x 0.60 x 6.67 = 52.608 170.976
B2 0.15 x 0.30 22.222222222 13.3333 0.12 5 Bh 0.08 0.15 Cm (0.20+0.3-0.1) x2 0.05x2 0.80 6.67 22.222222222 x 0.12 x 0.12 x 100 x 0.6165 x 5 = 98.64 22.222222222 x 0.08 x 0.08 x 100 x 0.6165 x 0.80 x 6.67 = 46.76266667 145.403
B1 0.25 x 0.60 6.6666666667 7.3333 0.16 10 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 1.60 6.67 6.6666666667 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 105.216 6.6666666667 x 0.08 x 0.08 x 100 x 0.6165 x 1.60 x 6.67 = 28.0576 133.274
B2 0.25 x 0.40 10 9.0000 0.16 11 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.20 6.67 10 x 0.16 x 0.16 x 100 x 0.6165 x 11 = 173.6064 10 x 0.08 x 0.08 x 100 x 0.6165 x 1.20 x 6.67 = 31.5648 205.171
B3 0.20 x 0.40 12.5 10.0000 0.16 9 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 1.10 6.67 12.5 x 0.16 x 0.16 x 100 x 0.6165 x 9 = 177.552 12.5 x 0.08 x 0.08 x 100 x 0.6165 x 1.10 x 6.67 = 36.168 213.720
B4 0.20 x 0.40 12.5 10.0000 0.16 10 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 1.10 6.67 12.5 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 197.28 12.5 x 0.08 x 0.08 x 100 x 0.6165 x 1.10 x 6.67 = 36.168 233.448
B4 0.13 x 0.20 38.461538462 17.6923 0.10 4 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 0.56 6.67 38.461538462 x 0.1 x 0.1 x 100 x 0.6165 x 4 = 94.84615385 38.461538462 x 0.08 x 0.08 x 100 x 0.6165 x 0.56 x 6.67 = 56.65476923 151.501
K1 0.11 x 0.11 82.644628099 27.2727 0.16 10 Bh 0.08 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 0.34 6.67 82.644628099 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 1304.330579 82.644628099 x 0.08 x 0.08 x 100 x 0.6165 x 0.34 x 6.67 = 73.91206612 1378.243
K2 0.30 x 0.40 8.3333333333 8.3333 0.16 6 Bh 0.08 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 1.30 6.67 8.3333333333 x 0.16 x 0.16 x 100 x 0.6165 x 6 = 78.912 8.3333333333 x 0.08 x 0.08 x 100 x 0.6165 x 1.30 x 6.67 = 28.496 107.408
K3 0.20 x 0.20 25 15.0000 0.16 4 Bh 0.08 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 0.70 6.67 25 x 0.16 x 0.16 x 100 x 0.6165 x 4 = 157.824 25 x 0.08 x 0.08 x 100 x 0.6165 x 0.70 x 6.67 = 46.032 203.856
S1 0.25 x 0.60 6.6666666667 7.3333 0.16 10 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 1.60 6.67 6.6666666667 x 0.16 x 0.16 x 100 x 0.6165 x 10 = 105.216 6.6666666667 x 0.08 x 0.08 x 100 x 0.6165 x 1.60 x 6.67 = 28.0576 133.274
S2 0.25 x 0.40 10 9.0000 0.16 11 Bh 0.08 0.15 Cm (0.45+0.25-0.1) x2 0.05x2 1.20 6.67 10 x 0.16 x 0.16 x 100 x 0.6165 x 11 = 173.6064 10 x 0.08 x 0.08 x 100 x 0.6165 x 1.20 x 6.67 = 31.5648 205.171
S3 0.20 x 0.40 12.5 10.0000 0.16 8 Bh 0.08 0.15 Cm (0.40+0.15-0.1) x2 0.05x2 1.10 6.67 12.5 x 0.16 x 0.16 x 100 x 0.6165 x 8 = 157.824 12.5 x 0.08 x 0.08 x 100 x 0.6165 x 1.10 x 6.67 = 36.168 193.992
K3 0.20 x 0.30 16.666666667 11.6667 0.12 6 Bh 0.08 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 0.90 6.67 16.666666667 x 0.12 x 0.12 x 100 x 0.6165 x 6 = 88.776 16.666666667 x 0.08 x 0.08 x 100 x 0.6165 x 0.90 x 6.67 = 39.456 128.232
K1 0.11 x 0.18 50.505050505 20.2020 0.12 4 Bh 0.08 0.15 Cm (0.30+0.50-0.1) x2 0.05x2 0.48 6.67 50.505050505 x 0.12 x 0.12 x 100 x 0.6165 x 4 = 179.3454545 50.505050505 x 0.08 x 0.08 x 100 x 0.6165 x 0.48 x 6.67 = 63.76727273 243.113