Jumlah I
Jumlah II
Jumlah IV
TAUFIK HERMAN
Direktur
3,529,800,000.00
3,529,800,000.00
192,296,000.00
166,034,000.00
289,198,000.00
452,623,000.00
1,100,151,000.00
256,500,000.00
25,650,000.00
282,150,000.00
1,317,540,000.00
266,400,000.00
439,740,000.00
183,420,000.00
2,207,100,000.00
550,712,000.00
651,544,000.00
1,202,256,000.00
8,321,457,000.00
h satu juta empat ratus lima puluh tujuh ribu rupiah.
HARGA SATUAN
NO URAIAN PEKERJAAN Kode Analisa VOLUME JUMLAH (Rp)
(Rp)
I. PEKERJAAN PERSIAPAN
- Pembentukan tapak perumahan SNI-2.6.1 30.00 M3 67,170.00 2,015,100.00
- Pengukuran Dan Pemasangan Bouwplank SNI-1.6.4 24.00 M' 46,271.00 1,110,504.00
3,125,604.00
II. PEMBUATAN RUMAH
2.1 Pekerjaan Tanah/Pondasi/Lantai
- Galian Tanah Biasa Sedalam 1m untuk Pondasi SNI-2.6.1 2.40 M3 67,170.00 161,208.00
- Urugan Kembali Tanah Bekas Galian SNI-2.6.9 10.26 M3 33,650.00 345,249.00
- Urugan Pasir SNI-2.6.11 2.00 M3 181,600.00 363,200.00
- Pondasi Umpak Pasangan Pondasi Batu Kali 1:5 SNI-3.6.6 0.83 M3 677,262.00 560,772.94
- Lantai Tumbuk 1 : 3 : 5 Tebal 8 Cm SNI-6.1.1 3.00 M3 720,998.00 2,162,994.00
- Acian SNI-5.6.5 a 36.00 M2 18,657.60 671,673.60
- Beton Bertulang 1 : 2 : 3 untuk Sloof Ukuran 12/15 SNI-7.6.5 0.70 M3 4,248,278.00 2,973,794.60
- Pas. Batu Bataco 1 : 5 SNI-4.6.25 2.40 M2 101,728.80 244,149.12
7,483,041.26
2.2 Pek. Kerangka/Dinding/Pintu & Jendela
- Pekerjaan Kayu Untuk Tiang Utama 10/10 SNI-6.6.2 0.41 M3 5,459,000.00 2,238,190.00
- Pekerjaan Kayu Untuk Balok Atas 5/10 SNI-6.6.2 0.20 M3 5,459,000.00 1,091,800.00
- Pekerjaan Kayu Untuk Rangka Dinding Tegak 5/10 SNI-6.6.2 0.11 M3 5,459,000.00 600,490.00
- Pekerjaan Kayu Untuk Rangka Dinding Datar 5/10 SNI-6.6.2 0.16 M3 5,459,000.00 873,440.00
- Pekerjaan Kayu Kuda-Kuda 5/10 SNI-6.6.28 0.20 M3 4,618,200.00 937,494.60
- Pekerjaan Kayu Gording 5/7 SNI-6.6.28 0.49 M3 4,618,200.00 2,262,918.00
- Pekerjaan Kayu Skor Kuda-kuda 5/7 SNI-6.6.28 0.06 M3 4,618,200.00 277,092.00
- Pekerjaan Kayu Untuk Kusen Pintu/Jendela SNI-6.6.2 0.43 M3 5,459,000.00 2,347,370.00
- Dinding Papan Kayu 2/20 SNI-6.6.54 52.30 M2 85,100.00 4,450,730.00
- Ampig SNI-6.6.54 8.79 M2 85,100.00 748,029.00
- Pas. Dinding Batako 1 : 5 SNI-4.6.25 26.64 M2 101,728.80 2,710,055.23
- Plesteran Dinding 1 : 5 SNI-5.6.5 53.28 M2 48,710.80 2,595,311.42
- Acian Dinding SNI-5.6.5 a 53.28 M2 18,657.60 994,076.93
- Pintu Double Tripleks Tbl. 3 Mm SNI-6.6.15 7.33 M2 449,670.00 3,296,081.10
- Pintu Double Tripleks Lapis Seng SNI-6.6.15 a 1.47 M2 484,320.00 711,950.40
- Pasangan Rangka Jendela Kaca Rangka Kayu SNI-6.6.10 4.14 M2 471,220.00 1,950,850.80
- Pasangan Kaca Ma 0,45 SNI-12.6.16 2.30 M2 112,747.50 258,755.51
- Papan Jalusi SNI-6.6.54 0.15 M2 85,100.00 12,765.00
- Pasangan Kawat Ram Jendela SNI-12.6.15 1.68 M2 53,633.75 90,104.70
- List plang 2/20 SNI-6.6.52 6.82 M2 31,150.00 212,443.00
- Balai-balai 1/6.F.12 3.00 M2 114,235.00 342,705.00
29,002,652.70
2.3 Pekerjaan Atap
- Atap Seng Gelombang BJLS 20 (0,90 x 1,80 m) SNI-8.6.38 75.45 M2 57,260.00 4,320,267.00
- Bubungan/Nok Seng SNI-8.6.39 10.70 M' 38,990.00 417,193.00
- Pekerjaan Talang Seng Plat BJLS.20 H.17 6.30 M' 125,775.00 792,382.50
5,529,842.50
REKAPITULASI
I. PEKERJAAN PERSIAPAN 3,125,604.00
II. PEMBUATAN RUMAH
2.1 Pekerjaan Tanah/Pondasi/Lantai 7,483,041.26
2.2 Pekerjaan Kerangka/Dinding/Pintu/Jendela 29,002,652.70
2.3 Pekerjaan Atap 5,529,842.50
2.4 Pekerjaan Kunci/Penggantung 1,623,792.00
2.5 Pekerjaan Pengecatan 3,894,397.00
III. PEKERJAAN SANITASI 1,968,928.40
IV. PEKERJAAN LISTRIK 860,000.00
Jumlah 53,488,257.85
PPN 10% 5,348,825.79
Jumlah Total 58,837,083.64
Pembulatan 58,830,000.00
TAUFIK HERMAN
Direktur
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00
4.0000 Kg Paku 19,000.00
2.0000 Lt Minyak bekisting 5,000.00
150.0000 Kg Besi beton polos 10,900.00
4.5000 Kg kawat beton 17,300.00
323.0000 Kg Semen PC 1,496.00
0.5200 M3 Pasir beton 149,000.00
0.7800 M3 Koral beton 152,000.00
0.1500 M3 Balok kayu 1,500,000.00
3.5000 Lbr Plywood 9 mm 122,500.00
20.0000 Btg Kayu Dolken 20,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00
0.2280 Zak Semen PC 74,800.00
0.0300 Zak Semen Putih 22,800.00
0.0420 M3 Pasir Pasang 149,000.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
SNI-6.6.60 1 M' Memasang List Plafond
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00
0.3500 Ls Perlengkapan 3,150.00
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00
0.3500 Ls Perlengkapan 28,770.00
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00 600,000.0
4.0000 Kg Paku 19,000.00 76,000.00 76,000.0
2.0000 Lt Minyak bekisting 5,000.00 10,000.00 10,000.0
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00 1,635,000.0
4.5000 Kg kawat beton 17,300.00 77,850.00 77,850.0
323.0000 Kg Semen PC 1,496.00 483,208.00 483,208.0
0.5200 M3 Pasir beton 149,000.00 77,480.00 77,480.0
0.7800 M3 Koral beton 152,000.00 118,560.00 118,560.0
0.1500 M3 Balok kayu 1,500,000.00 225,000.00 225,000.0
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00 428,750.0
20.0000 Btg Kayu Dolken 20,000.00 400,000.00 400,000.0
5,577,698.0
PEKERJAAN KAYU
I-6.6.28 1 M3 Kap/Kuda-Kuda Gording
1.1000 M3 Kayu Klas II 2,000,000.00 2,200,000.00 2,200,000.0
15.0000 Kg Besi Strip 25,400.00 381,000.00 381,000.0
0.8000 Kg Paku 19,000.00 15,200.00 15,200.0
12.0000 Oh Tukang Kayu 125,000.00 1,500,000.00 1,500,000.0
1.2000 Oh Kepala Tukang 130,000.00 156,000.00 156,000.0
4.0000 Oh Pekerja 85,000.00 340,000.00 340,000.0
0.2000 Oh Mandor 130,000.00 26,000.00 26,000.0
4,618,200.0
I- 6.6.31 1 M2 Pek. Pemasangan Kaso + Reng
0.0120 M3 Kayu Klas II 2,000,000.00 24,000.00 24,000.0
0.1500 Kg Paku 19,000.00 2,850.00 2,850.0
0.1000 Oh Tukang Kayu 125,000.00 12,500.00 12,500.0
0.0100 Oh Kepala Tukang 130,000.00 1,300.00 1,300.0
0.1000 Oh Pekerja 85,000.00 8,500.00 8,500.0
0.0550 Oh Mandor 130,000.00 7,150.00 7,150.0
56,300.0
I-6.6.40 1 M2 Rangka Plafond
0.0120 M3 Kayu Klas III 1,800,000.00 21,600.00 21,600.0
0.1000 Kg Paku 19,000.00 1,900.00 1,900.0
0.1500 Oh Tukang Kayu 125,000.00 18,750.00 18,750.0
0.0150 Oh Kepala Tukang 130,000.00 1,950.00 1,950.0
0.1500 Oh Pekerja 85,000.00 12,750.00 12,750.0
0.0550 Oh Mandor 130,000.00 7,150.00 7,150.0
64,100.0
I. PEKERJAAN ATAP
I-8.6.15 1 M2 Atap Asbes Gelombang (2,4 X 1,05 M) X 4 Mm
0.4400 Lbr Asbes Gelombang 38,500.00 16,940.00 16,940.0
0.1200 Kg Paku Asbes 18,500.00 2,220.00 2,220.0
0.0670 Oh Tukang Kayu 125,000.00 8,375.00 8,375.0
0.0070 Oh Kepala Tukang 130,000.00 910.00 910.0
0.1400 Oh Pekerja 85,000.00 11,900.00 11,900.0
0.0070 Oh Mandor 130,000.00 910.00 910.0
41,255.0
PEKERJAAN SANITASI
I-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00 9,000.0
0.3500 Ls Perlengkapan 3,150.00 1,102.50 1,102.5
0.0600 Oh Tukang 125,000.00 7,500.00 7,500.0
0.0060 Oh Kepala Tukang 130,000.00 780.00 780.0
0.0360 Oh Pekerja 85,000.00 3,060.00 3,060.0
0.0018 Oh Mandor 130,000.00 234.00 234.0
10,102.50 21,676.5
NI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00 82,200.0
0.3500 Ls Perlengkapan 28,770.00 10,069.50 10,069.5
0.1350 Oh Tukang Batu 125,000.00 16,875.00 16,875.0
0.0135 Oh Kepala Tukang 130,000.00 1,755.00 1,755.0
0.0810 Oh Pekerja 85,000.00 6,885.00 6,885.0
0.0041 Oh Mandor 130,000.00 533.00 533.0
118,317.5
NI-11.6.28 1M' Pasangan Pipa PVC 1 1/2 Inchi
1.2000 M' Pipa dia1 1/2 " 71,500.00 85,800.00 85,800.0
0.3500 Ls Perlengkapan 30,030.00 10,510.50 10,510.5
0.1350 Oh Tukang Batu 125,000.00 16,875.00 16,875.0
0.0135 Oh Kepala Tukang 130,000.00 1,755.00 1,755.0
0.0810 Oh Pekerja 85,000.00 6,885.00 6,885.0
0.0041 Oh Mandor 130,000.00 533.00 533.0
122,358.5
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
1 TUKANG Orang / Hari 125,000
2 KEPALA TUKANG Orang / Hari 130,000
3 PEKERJA Orang / Hari 85,000
4 MANDOR Orang / Hari 130,000
5 OPERATOR ALAT BERAT Orang / Hari 140,000
6 PEMBANTU OPERATOR ALAT BERAT Orang / Hari 100,000
7 OPERATOR CHAINSAW Orang / Hari 135,000
8 PEMBANTU OPERATOR CHAINSAW Orang / Hari 100,000
9 OPERATOR MOLEN Orang / Hari 135,000
10 SOPIR Orang / Hari 130,000
11 PEMBANTU SOPIR / KENEK Orang / Hari 90,000
12 MEKANIK Orang / Hari 135,000
13 PEMBANTU MEKANIK Orang / Hari 110,000
REKAPITULASI
TAUFIK HERMAN
Direktur
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00
4.0000 Kg Paku 19,000.00
2.0000 Lt Minyak bekisting 5,000.00
150.0000 Kg Besi beton polos 10,900.00
4.5000 Kg kawat beton 17,300.00
323.0000 Kg Semen PC 1,496.00
0.5200 M3 Pasir beton 149,000.00
0.7800 M3 Koral beton 152,000.00
0.1500 M3 Balok kayu 1,500,000.00
3.5000 Lbr Plywood 9 mm 122,500.00
20.0000 Btg Kayu Dolken 20,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00
0.2280 Zak Semen PC 74,800.00
0.0300 Zak Semen Putih 22,800.00
0.0420 M3 Pasir Pasang 149,000.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
SNI-6.6.60 1 M' Memasang List Plafond
1.0500 m' List Plafon 13,300.00
0.0300 Kg Paku Tripleks 19,000.00
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00
0.3500 Ls Perlengkapan 3,150.00
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00
0.3500 Ls Perlengkapan 28,770.00
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
12,750.00
6,500.00
19,250.00
6,000.00 6,000.00
9,500.00 9,500.00
741.00 741.00
25,000.00
520.00
4,250.00
260.00
46,271.00
63,920.00
3,250.00
67,170.00
31,960.00
1,690.00
33,650.00
66,000.00 66,000.00
25,500.00
1,300.00
92,800.00
154,800.00 154,800.00
25,500.00
1,300.00
181,600.00
188,400.00 188,400.00
38,700.00 38,700.00
48,750.00
5,070.00
66,300.00
5,070.00
352,290.00
73,500.00 73,500.00
21,467.60 21,467.60
5,960.00 5,960.00
12,500.00
1,300.00
27,200.00
1,950.00
143,877.60
73,500.00 73,500.00
14,511.20 14,511.20
7,301.00 7,301.00
12,500.00
1,300.00
27,200.00
1,950.00
138,262.20
38,350.00 38,350.00
19,148.80 19,148.80
2,980.00 2,980.00
12,500.00
1,300.00
25,500.00
1,950.00
101,728.80
38,350.00 38,350.00
38,297.60 38,297.60
2,980.00 2,980.00
18,750.00
1,950.00
29,750.00
2,340.00
132,417.60
412,250.00
43,750.00
195,000.00
175,000.00
43,030.00
22,100.00
405,000.00 405,000.00
38,000.00 38,000.00
3,000.00 3,000.00
2,180,000.00 2,180,000.00
51,900.00 51,900.00
483,208.00 483,208.00
77,480.00 77,480.00
118,560.00 118,560.00
4,248,278.00
600,000.00 600,000.00
76,000.00 76,000.00
10,000.00 10,000.00
1,635,000.00 1,635,000.00
77,850.00 77,850.00
483,208.00 483,208.00
77,480.00 77,480.00
118,560.00 118,560.00
225,000.00 225,000.00
428,750.00 428,750.00
400,000.00 400,000.00
5,577,698.00
132,240.00 132,240.00
77,480.00 77,480.00
326,128.00 326,128.00
31,250.00
3,250.00
140,250.00
10,400.00
720,998.00
6,688.00 6,688.00
3,874.00 3,874.00
14,960.00 14,960.00
2,500.00
260.00
97,750.00
780.00
126,812.00
12,716.00 12,716.00
2,533.00 2,533.00
18,750.00
1,950.00
17,000.00
1,300.00
54,249.00
6,432.80 6,432.80
3,278.00 3,278.00
18,750.00
1,950.00
17,000.00
1,300.00
48,710.80
79,000.00 79,000.00
17,054.40 17,054.40
684.00 684.00
6,258.00 6,258.00
43,750.00
4,550.00
52,700.00
3,900.00
207,896.40
84,000.00 84,000.00
2,086.00 2,086.00
20,944.00 20,944.00
16,250.00
1,690.00
22,950.00
1,820.00
149,740.00
2,200,000.00 2,200,000.00
381,000.00 381,000.00
15,200.00 15,200.00
1,500,000.00
156,000.00
340,000.00
26,000.00
4,618,200.00
24,000.00 24,000.00
2,850.00 2,850.00
12,500.00
1,300.00
8,500.00
7,150.00
56,300.00
21,600.00 21,600.00
1,900.00 1,900.00
18,750.00
1,950.00
12,750.00
7,150.00
64,100.00
35,900.00 35,900.00
570.00 570.00
12,500.00
1,300.00
5,950.00
455.00
56,675.00
120,775.00
13,965.00 13,965.00
570.00 570.00
2,400,000.00 2,400,000.00
2,250,000.00
260,000.00
510,000.00
39,000.00
5,459,000.00
120,000.00 120,000.00
2,850.00 2,850.00
250,000.00
26,000.00
42,500.00
3,250.00
444,600.00
8,800.00 8,800.00
570.00 570.00
12,500.00
130.00
8,500.00
650.00
31,150.00
80,000.00 80,000.00
312,500.00
32,500.00
85,000.00
6,500.00
516,500.00
70,000.00 70,000.00
52,020.00 52,020.00
250,000.00 250,000.00
26,000.00
68,000.00
5,200.00
471,220.00
47,500.00 47,500.00
1,900.00 1,900.00
18,750.00
1,950.00
8,500.00
6,500.00
85,100.00
39,200.00 39,200.00
71,800.00 71,800.00
570.00 570.00
7,200.00 7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
449,670.00
39,200.00 39,200.00
71,800.00 71,800.00
34,650.00 34,650.00
570.00 570.00
7,200.00 7,200.00
250,000.00
26,000.00
51,000.00
53,200.00 53,200.00
18,000.00 18,000.00
2,850.00 2,850.00
6,545.00
30,000.00
3,120.00
520.00
114,235.00
16,940.00 16,940.00
2,220.00 2,220.00
8,375.00
910.00
11,900.00
910.00
41,255.00
37,590.00 37,590.00
410.00 410.00
7,500.00
780.00
10,200.00
780.00
57,260.00
14,850.00 14,850.00
820.00 820.00
8,750.00
1,040.00
12,750.00
780.00
38,990.00
95,700.00 95,700.00
18,750.00
1,950.00
12,750.00
97.50
129,247.50
79,200.00 79,200.00
18,750.00
1,950.00
12,750.00
97.50
112,747.50
12,300.00 12,300.00
4,000.00 4,000.00
285.00
18,750.00
9,750.00
8,500.00
48.75
53,633.75
5,800.00 5,800.00
2,635.00 2,635.00
21,000.00 21,000.00
2,700.00 2,700.00
1,800.00 1,800.00
700.00 700.00
1,125.00
780.00
5,425.00 5,425.00
1,550.00 1,550.00
1,800.00 1,800.00
700.00 700.00
7,500.00
780.00
1,700.00
390.00
19,845.00
700.00 700.00
1,725.00 1,725.00
125.00
13.00
12,750.00
325.00
15,638.00
9,000.00 9,000.00
1,102.50 1,102.50
7,500.00
780.00
3,060.00
234.00
10,102.50 21,676.50
82,200.00 82,200.00
10,069.50 10,069.50
16,875.00
1,755.00
6,885.00
533.00
118,317.50
85,800.00 85,800.00
10,510.50 10,510.50
16,875.00
1,755.00
6,885.00
533.00
122,358.50
272,500.00 272,500.00
7,350.00 7,350.00
8,976.00 8,976.00
1,490.00 1,490.00
187,500.00
39,000.00
85,000.00
14,300.00
616,116.00
194,250.00 194,250.00
224,400.00 224,400.00
44,700.00 44,700.00
375,000.00
39,000.00
510,000.00
39,000.00
1,426,350.00
33,500.00 33,500.00
1,085.40 1,085.40
187,500.00
39,000.00
85,000.00
14,300.00
360,385.40
210,000.00 210,000.00
62,500.00
1,300.00
850.00
650.00
275,300.00
5,000.00 5,000.00
18,750.00
1,950.00
1,275.00
104.00
27,079.00
12,000.00 12,000.00
18,750.00
1,950.00
1,275.00
104.00
34,079.00
8,000.00 8,000.00
18,750.00
1,950.00
1,275.00
104.00
30,079.00
123,750.00 123,750.00
160,000.00 160,000.00
9,500.00 9,500.00
625,000.00
65,000.00
255,000.00
19,500.00
1,257,750.00
125,775.00
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
1 TUKANG Orang / Hari 125,000
2 KEPALA TUKANG Orang / Hari 130,000
3 PEKERJA Orang / Hari 85,000
4 MANDOR Orang / Hari 130,000
5 OPERATOR ALAT BERAT Orang / Hari 140,000
6 PEMBANTU OPERATOR ALAT BERAT Orang / Hari 100,000
7 OPERATOR CHAINSAW Orang / Hari 135,000
8 PEMBANTU OPERATOR CHAINSAW Orang / Hari 100,000
9 OPERATOR MOLEN Orang / Hari 135,000
10 SOPIR Orang / Hari 130,000
11 PEMBANTU SOPIR / KENEK Orang / Hari 90,000
12 MEKANIK Orang / Hari 135,000
13 PEMBANTU MEKANIK Orang / Hari 110,000
02. RAB Rumah Ibadah (APBN) H. Bahan Dan Upah Halaman 11 Dari 12
II. BAHAN
1 KAYU KELAS II M3 2,000,000 - 2,000,000
30 KACA 5 MM M2 80,000 7,000 87,000
31 TALANG FIBER GLASS M' 14,000 3,000 17,000
32 SENG GELOMBANG BJLS 20 BDR 11 LBR 51,200 2,500 53,700
33 SENG PLAT BJLS 20 LBR 47,000 2,500 49,500
34 ASBES GELOMBANG ( 210 X 105 CM ) LBR 35,000 3,500 38,500
35 BUBUNGAN ASBES ( NOK SET ) PSG 21,000 3,500 24,500
36 PAKU KG 18,500 500 19,000
37 PAKU SENG KG 20,000 500 20,500
38 PAKU ASBES / ULIR KG 18,000 500 18,500
39 PAKU TRIPLEKS KG 23,000 500 23,500
###
40 PAKU JEMBATAN KG 27,000 500 27,500
41 CAT MENIE KG 28,000 1,000 29,000
42 CAT KAYU ( PLATON / SEJENIS ) KG 60,000 - 60,000
43 LEM KAYU KG 24,000 - 24,000
44 MINYAK CAT LITER 18,000 - 18,000
45 PLAMUR KG 18,000 - 18,000
46 CAT TEMBOK KG 15,500 - 15,500
47 CAT DASAR TL KG 15,500 - 15,500
48 RESIDU KG 12,000 - 12,000
49 KUNCI TANAM (CHIKA BROWN / SEJENIS) BH 120,000 - 120,000
50 ENGSEL PINTU BH 10,000 - 10,000
51 ENGSEL JENDELA BH 10,000 - 10,000
52 GERENDEL PINTU BH 12,000 - 12,000
53 GERENDEL JENDELA BH 8,000 - 8,000
54 ANGKUR/BAUT/SENGKANG/STRIP BH 8,000 - 8,000
55 KAIT ANGIN BH 5,000 - 5,000
56 KLOSET JONGKOK (American standar) BH 265,000 7,500 272,500
57 BAK AIR FIBBERGLASS BH 26,000 7,500 33,500
58 SALURAN AIR BERSIH ( PVC 3/4" ) M' 6,000 1,500 7,500
59 SALURAN AIR KOTOR ( PVC 4" ) M' 67,000 1,500 68,500
60 PIPA GI MEDIUM (1 1/2") M' 70,000 1,500 71,500
61 TITIK LAMPU TITIK 222,000 - 222,000
62 STOP KONTAK TITIK 222,000 - 222,000
63 SAKLAR BH 25,000 - 25,000
64 ZEKRING BOKS GROUP LOKAL BH 200,000 - 200,000
65 ESPANYOLET ( KUNCI GUDANG ) BH 210,000 - 210,000
66 GEMBOK RUMAH (LENGKAP) KG 45,000 - 45,000
67 KAPUR SIRIH KG 10,000 1,500 11,500
68 PINTU PANIL 80 x 200 cm UNIT 650,000 4,000 654,000
69 PINTU TRIPLEK MIKA 70 x 200 cm UNIT 230,000 4,000 234,000
70 GANTUNGAN TALANG (BESI) BH 5,000 - 5,000
71 PIPA PCV 4" - 3 M + KENIE UNIT 95,000 4,000 99,000
72 AMPLAS LBR 7,000 - 7,000
73 KAWAT RAM (TERPASANG) BH 25,000 - 25,000
74 BAK AIR VIBRE GLASS 60 x 60 x 69 CM BH 230,000 4,000 234,000
75 IJUK KG 10,000 - 10,000
###
76 SIRTU M3 97,500 37,500 135,000
77 TIANG KEREKAN UNIT 120,000 - 120,000
78 KEREKAN BESI DAN PENGGANTUNG UNIT 100,000 - 100,000
79 TALI KEREKAN M1 8,000 - 8,000
###
80 EMBER KECIL BH 10,000 - 10,000
81 EMBER PAKAI PENUTUP KAP. 80 LITER BH 145,000 - 145,000
82 KAYU BULAT DIA 20 - 25 CM (TIANG JEMBATA M' 12,000 - 12,000
83 PRIMCOAT Kg 15,000 - 15,000
02. RAB Rumah Ibadah (APBN) H. Bahan Dan Upah Halaman 12 Dari 12
PEMERINTAH KABUPATEN SIJUNJUNG Propinsi : Sumatera Barat
DINAS KETENAGAKERJAAN DAN TRANSMIGRASI Kabupaten : Sijunjung
Gedung Bersama Lt.1 Telp.(0754) 20027 Fax.(0754) 20145 Lokasi : Padang Tarok
MUARO SIJUNJUNG 27511 Tahun Anggaran : 2018
REKAPITULASI
TAUFIK HERMAN
Direktur
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00
4.0000 Kg Paku 19,000.00 76,000.00
2.0000 Lt Minyak bekisting 5,000.00 10,000.00
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00
4.5000 Kg kawat beton 17,300.00 77,850.00
323.0000 Kg Semen PC 1,496.00 483,208.00
0.5200 M3 Pasir beton 149,000.00 77,480.00
0.7800 M3 Koral beton 152,000.00 118,560.00
0.1500 M3 Balok kayu 1,500,000.00 225,000.00
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00
20.0000 Btg Kayu Dolken 20,000.00 400,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00 79,000.00
0.2280 Zak Semen PC 74,800.00 17,054.40
0.0300 Zak Semen Putih 22,800.00 684.00
0.0420 M3 Pasir Pasang 149,000.00 6,258.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00
0.3500 Ls Perlengkapan 3,150.00 1,102.50
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
10,102.50
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00
0.3500 Ls Perlengkapan 28,770.00 10,069.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00 600,000.00
4.0000 Kg Paku 19,000.00 76,000.00 76,000.00
2.0000 Lt Minyak bekisting 5,000.00 10,000.00 10,000.00
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00 1,635,000.00
4.5000 Kg kawat beton 17,300.00 77,850.00 77,850.00
323.0000 Kg Semen PC 1,496.00 483,208.00 483,208.00
0.5200 M3 Pasir beton 149,000.00 77,480.00 77,480.00
0.7800 M3 Koral beton 152,000.00 118,560.00 118,560.00
0.1500 M3 Balok kayu 1,500,000.00 225,000.00 225,000.00
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00 428,750.00
20.0000 Btg Kayu Dolken 20,000.00 400,000.00 400,000.00
5,577,698.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00 79,000.00 79,000.00
0.2280 Zak Semen PC 74,800.00 17,054.40 17,054.40
0.0300 Zak Semen Putih 22,800.00 684.00 684.00
0.0420 M3 Pasir Pasang 149,000.00 6,258.00 6,258.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00 3,900.00
207,896.40
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00 9,000.00
0.3500 Ls Perlengkapan 3,150.00 1,102.50 1,102.50
0.0600 Oh Tukang 125,000.00 7,500.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00 234.00
10,102.50 21,676.50
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00 82,200.00
0.3500 Ls Perlengkapan 28,770.00 10,069.50 10,069.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00 533.00
118,317.50
SNI-11.6.28 1M' Pasangan Pipa PVC 1 1/2 Inchi
1.2000 M' Pipa dia1 1/2 " 71,500.00 85,800.00 85,800.00
0.3500 Ls Perlengkapan 30,030.00 10,510.50 10,510.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00 533.00
122,358.50
SNI-10.6.3 1 BH Memasang Closed Jongkok
1.0000 BH Kloset Jongkok 272,500.00 272,500.00 272,500.00
7.0000 BH Batu Bata 1,050.00 7,350.00 7,350.00
0.1200 Zak Semen PC 74,800.00 8,976.00 8,976.00
0.0100 M3 Pasir Pasang 149,000.00 1,490.00 1,490.00
1.5000 Oh Tukang Batu 125,000.00 187,500.00 187,500.00
0.3000 Oh Kepala Tukang 130,000.00 39,000.00 39,000.00
1.0000 Oh Pekerja 85,000.00 85,000.00 85,000.00
0.1100 Oh Mandor 130,000.00 14,300.00 14,300.00
616,116.00
SNI-10.6.8 1 BH Bak Mandi Dari Batu Bata Vol. 030 M3
185.0000 BH Batu Bata 1,050.00 194,250.00 194,250.00
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
II. BAHAN
I. PEKERJAAN PERSIAPAN
- Pembersihan Lapangan SNI-1.6.8 180.00 M2 19,250.00
- Pembentukan tapak SNI-2.6.1 30.00 M3 67,170.00
- Pengukuran Bowplank SNI-1.6.4 53.00 M' 46,271.00
###
###
II. PEKERJAAN TANAH
- Galian Tanah Biasa Sedalam 1m untuk Pondasi SNI-2.6.1 71.00 M3 67,170.00
###
- Timbunan Tanah Pilihan u/ Urugan Tanah Bawah Lantai & Pondasi SNI-2.6.11.b 30.33 M3 92,800.00
- Urugan Pasir u/ Urugan Tanah Bawah Lantai & Pondasi SNI-2.6.11 11.83 M3 181,600.00
###
V. PEKERJAAN ATAP
- Atap Seng Gelombang BJLS 20 (0,90 x 1,80 m) SNI-8.6.38 116.00 M2 57,260.00
###
- Bubungan/Nok Seng Plat BJLS 20 SNI-8.6.39 17.00 M' 57,260.00
###
- Talang Seng BJLS.20 H.17 34.00 M' 125,775.00
###
- Listplank SNI-6.6.49 54.00 M' 46,750.00
###
###
VI. PEKERJAAN KUNCI/PENGGANTUNG
- Kunci Tanam Lengkap SNI-12.6.2 12.00 BH 185,300.00
###
- Engsel Pintu SNI-12.6.5 24.00 BH 32,079.00
###
- Engsel Jendela SNI-12.6.5 32.00 BH 32,079.00
###
- Grendel Pintu SNI-12.6.9 12.00 BH 27,079.00
###
- Grendel Jendela SNI-12.6.9 16.00 BH 27,079.00
###
- Angkur/Baut/Sengkang Ls 48.00 BH 15,000.00
###
REKAPITULASI
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN BATU/BETON
IV. PEKERJAAN KAYU
V. PEKERJAAN ATAP
VI PEKERJAAN KUNCI/PENGGANTUNG
VII. PEKERJAAN SANITAIR
VIII. PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK
Jumlah
PPN 10%
Jumlah Total
Pembulatan
TAUFIK HERMAN
Direktur
I. PEKERJAAN PERSIAPAN
- Pembersihan Lapangan SNI-1.6.8 180.00 M2 19,250.00 3,465,000.00
- Pembentukan tapak SNI-2.6.1 30.00 M3 67,170.00 2,015,100.00
- Pengukuran Bowplank SNI-1.6.4 53.00 M' 46,271.00
### 2,452,363.00
### 7,932,463.00
II. PEKERJAAN TANAH
- Galian Tanah Biasa Sedalam 1m untuk Pondasi SNI-2.6.1 71.00 M3 67,170.00
### 4,769,070.00
- Timbunan Tanah Pilihan u/ Urugan Tanah Bawah Lantai & Pondasi SNI-2.6.11.b 30.33 M3 92,800.00 2,814,624.00
- Urugan Pasir u/ Urugan Tanah Bawah Lantai & Pondasi SNI-2.6.11 11.83 M3 181,600.00
### 2,148,328.00
9,732,022.00
REKAPITULASI
TAUFIK HERMAN
Direktur
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00
4.0000 Kg Paku 19,000.00 76,000.00
2.0000 Lt Minyak bekisting 5,000.00 10,000.00
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00
4.5000 Kg kawat beton 17,300.00 77,850.00
323.0000 Kg Semen PC 1,496.00 483,208.00
0.5200 M3 Pasir beton 149,000.00 77,480.00
0.7800 M3 Koral beton 152,000.00 118,560.00
0.1500 M3 Balok kayu 1,500,000.00 225,000.00
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00
20.0000 Btg Kayu Dolken 20,000.00 400,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00 79,000.00
0.2280 Zak Semen PC 74,800.00 17,054.40
0.0300 Zak Semen Putih 22,800.00 684.00
0.0420 M3 Pasir Pasang 149,000.00 6,258.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00
0.3500 Ls Perlengkapan 3,150.00 1,102.50
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
10,102.50
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00
0.3500 Ls Perlengkapan 28,770.00 10,069.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
12,750.00
6,500.00
19,250.00
6,000.00
9,500.00
741.00
25,000.00
520.00
4,250.00
260.00
46,271.00
63,920.00
3,250.00
67,170.00
31,960.00
1,690.00
33,650.00
66,000.00
25,500.00
1,300.00
92,800.00
154,800.00
25,500.00
1,300.00
181,600.00
188,400.00
38,700.00
48,750.00
5,070.00
66,300.00
5,070.00
352,290.00
73,500.00
21,467.60
5,960.00
12,500.00
1,300.00
27,200.00
1,950.00
143,877.60
73,500.00
14,511.20
7,301.00
12,500.00
1,300.00
27,200.00
1,950.00
138,262.20
38,350.00
19,148.80
2,980.00
12,500.00
1,300.00
25,500.00
1,950.00
101,728.80
38,350.00
38,297.60
2,980.00
18,750.00
1,950.00
29,750.00
2,340.00
132,417.60
412,250.00
43,750.00
195,000.00
175,000.00
43,030.00
22,100.00
405,000.00
38,000.00
3,000.00
2,180,000.00
51,900.00
483,208.00
77,480.00
118,560.00
4,248,278.00
600,000.00
76,000.00
10,000.00
1,635,000.00
77,850.00
483,208.00
77,480.00
118,560.00
225,000.00
428,750.00
400,000.00
5,577,698.00
132,240.00
77,480.00
326,128.00
31,250.00
3,250.00
140,250.00
10,400.00
720,998.00
6,688.00
3,874.00
14,960.00
2,500.00
260.00
97,750.00
780.00
126,812.00
12,716.00
2,533.00
18,750.00
1,950.00
17,000.00
1,300.00
54,249.00
6,432.80
3,278.00
18,750.00
1,950.00
17,000.00
1,300.00
48,710.80
79,000.00
17,054.40
684.00
6,258.00
43,750.00
4,550.00
52,700.00
3,900.00
207,896.40
-
2,086.00
20,944.00
16,250.00
1,690.00
22,950.00
1,820.00
65,740.00
2,200,000.00
381,000.00
15,200.00
1,500,000.00
156,000.00
340,000.00
26,000.00
4,618,200.00
24,000.00
2,850.00
12,500.00
1,300.00
8,500.00
7,150.00
56,300.00
21,600.00
1,900.00
18,750.00
1,950.00
12,750.00
7,150.00
64,100.00
35,900.00
570.00
12,500.00
1,300.00
5,950.00
455.00
56,675.00
120,775.00
2,400,000.00
2,250,000.00
260,000.00
510,000.00
39,000.00
5,459,000.00
22,000.00
950.00
12,500.00
1,300.00
9,350.00
650.00
46,750.00
8,800.00
570.00
12,500.00
130.00
8,500.00
650.00
31,150.00
80,000.00
312,500.00
32,500.00
85,000.00
6,500.00
516,500.00
70,000.00
52,020.00
250,000.00
26,000.00
68,000.00
5,200.00
471,220.00
47,500.00
1,900.00
18,750.00
1,950.00
8,500.00
6,500.00
85,100.00
39,200.00
71,800.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
39,200.00
71,800.00
34,650.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
484,320.00
16,940.00
2,220.00
8,375.00
910.00
11,900.00
910.00
41,255.00
51,450.00
740.00
15,625.00
1,690.00
7,140.00
520.00
77,165.00
37,590.00
410.00
7,500.00
780.00
10,200.00
780.00
57,260.00
14,850.00
820.00
8,750.00
1,040.00
12,750.00
780.00
38,990.00
95,700.00
18,750.00
1,950.00
12,750.00
97.50
129,247.50
79,200.00
18,750.00
1,950.00
12,750.00
97.50
112,747.50
5,800.00
2,635.00
21,000.00
2,700.00
1,800.00
700.00
1,125.00
780.00
5,950.00
1,170.00
43,660.00
700.00
1,725.00
125.00
13.00
12,750.00
325.00
15,638.00
4,200.00
4,250.00
780.00
9,230.00
9,000.00
1,102.50
7,500.00
780.00
3,060.00
234.00
21,676.50
82,200.00
10,069.50
16,875.00
1,755.00
6,885.00
533.00
118,317.50
85,800.00
10,510.50
16,875.00
1,755.00
6,885.00
533.00
122,358.50
272,500.00
7,350.00
8,976.00
1,490.00
187,500.00
39,000.00
85,000.00
14,300.00
616,116.00
33,500.00
1,085.40
187,500.00
39,000.00
85,000.00
14,300.00
360,385.40
210,000.00
62,500.00
1,300.00
850.00
650.00
275,300.00
10,000.00
18,750.00
1,950.00
1,275.00
104.00
32,079.00
5,000.00
18,750.00
1,950.00
1,275.00
104.00
27,079.00
12,000.00
18,750.00
1,950.00
1,275.00
104.00
34,079.00
8,000.00
18,750.00
1,950.00
1,275.00
104.00
30,079.00
123,750.00
160,000.00
9,500.00
625,000.00
65,000.00
255,000.00
19,500.00
1,257,750.00
125,775.00
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
II. BAHAN
04. RAB Rumah Petugas (APBN) H. Bahan Dan Upah Halaman 11 Dari 12
QUARY TRANSPORT HARGA
NO JENIS UPAH DAN BAHAN SATUAN
(RP) (RP) ( Rp.)
27 KERAMIK 20/20 CM M2 80,000 4,000 84,000
28 TEGEL PC ABU ABU 20 X 20 M2 80,000 4,000 84,000
29 KACA 3 MM M2 65,000 7,000 72,000
30 KACA 5 MM M2 80,000 7,000 87,000
31 TALANG FIBER GLASS M' 14,000 3,000 17,000
32 SENG GELOMBANG BJLS 20 BDR 11 LBR 51,200 2,500 53,700
33 SENG PLAT BJLS 20 LBR 47,000 2,500 49,500
34 ASBES GELOMBANG ( 210 X 105 CM ) LBR 35,000 3,500 38,500
35 BUBUNGAN ASBES ( NOK SET ) PSG 21,000 3,500 24,500
###
36 PAKU KG 18,500 500 19,000
37 PAKU SENG KG 20,000 500 20,500
38 PAKU ASBES / ULIR KG 18,000 500 18,500
39 PAKU TRIPLEKS KG 23,000 500 23,500
40 PAKU JEMBATAN KG 27,000 500 27,500
41 CAT MENIE KG 28,000 1,000 29,000
42 CAT KAYU ( PLATON / SEJENIS ) KG 60,000 - 60,000
43 LEM KAYU KG 24,000 - 24,000
44 MINYAK CAT LITER 18,000 - 18,000
45 PLAMUR KG 18,000 - 18,000
46 CAT TEMBOK KG 15,500 - 15,500
47 CAT DASAR TL KG 15,500 - 15,500
48 RESIDU KG 12,000 - 12,000
49 KUNCI TANAM (CHIKA BROWN / SEJENIS) BH 120,000 - 120,000
50 ENGSEL PINTU BH 10,000 - 10,000
51 ENGSEL JENDELA BH 10,000 - 10,000
52 GERENDEL PINTU BH 12,000 - 12,000
53 GERENDEL JENDELA BH 8,000 - 8,000
54 ANGKUR/BAUT/SENGKANG/STRIP BH 8,000 - 8,000
55 KAIT ANGIN BH 5,000 - 5,000
56 KLOSET JONGKOK (American standar) BH 265,000 7,500 272,500
57 BAK AIR FIBBERGLASS BH 26,000 7,500 33,500
58 SALURAN AIR BERSIH ( PVC 3/4" ) M' 6,000 1,500 7,500
59 SALURAN AIR KOTOR ( PVC 4" ) M' 67,000 1,500 68,500
60 PIPA GI MEDIUM (1 1/2") M' 70,000 1,500 71,500
61 TITIK LAMPU TITIK 222,000 - 222,000
62 STOP KONTAK TITIK 222,000 - 222,000
63 SAKLAR BH 25,000 - 25,000
64 ZEKRING BOKS GROUP LOKAL BH 200,000 - 200,000
65 ESPANYOLET ( KUNCI GUDANG ) BH 210,000 - 210,000
66 GEMBOK RUMAH (LENGKAP) KG 45,000 - 45,000
67 KAPUR SIRIH KG 10,000 1,500 11,500
68 PINTU PANIL 80 x 200 cm UNIT 650,000 4,000 654,000
69 PINTU TRIPLEK MIKA 70 x 200 cm UNIT 230,000 4,000 234,000
70 GANTUNGAN TALANG (BESI) BH 5,000 - 5,000
71 PIPA PCV 4" - 3 M + KENIE UNIT 95,000 4,000 99,000
###
72 AMPLAS LBR 7,000 - 7,000
73 KAWAT RAM (TERPASANG) BH 25,000 - 25,000
74 BAK AIR VIBRE GLASS 60 x 60 x 69 CM BH 230,000 4,000 234,000
75 IJUK KG 10,000 - 10,000
###
76 SIRTU M3 97,500 37,500 135,000
77 TIANG KEREKAN UNIT 120,000 - 120,000
78 KEREKAN BESI DAN PENGGANTUNG UNIT 100,000 - 100,000
79 TALI KEREKAN M1 8,000 - 8,000
80 EMBER KECIL BH 10,000 - 10,000
81 EMBER PAKAI PENUTUP KAP. 80 LITER BH 145,000 - 145,000
82 KAYU BULAT DIA 20 - 25 CM (TIANG JEMBATA M' 12,000 - 12,000
83 PRIMCOAT Kg 15,000 - 15,000
04. RAB Rumah Petugas (APBN) H. Bahan Dan Upah Halaman 12 Dari 12
QUARY TRANSPORT HARGA
NO JENIS UPAH DAN BAHAN SATUAN
(RP) (RP) ( Rp.)
04. RAB Rumah Petugas (APBN) H. Bahan Dan Upah Halaman 13 Dari 12
PEMERINTAH KABUPATEN SIJUNJUNG Propinsi :
DINAS KETENAGAKERJAAN DAN TRANSMIGRASI Kabupaten :
Gedung Bersama Lt.1 Telp.(0754) 20027 Fax.(0754) 20145 Lokasi :
MUARO SIJUNJUNG 27511 Tahun Anggaran :
V. PEKERJAAN ATAP
- Atap Seng Gelombang BJLS 20 (0,90 x 1,80 m) SNI-8.6.38 321.45 M2 57,260.00
- Bubungan/Nok Seng Plat BJLS 20 SNI-8.6.39 36.00 M' 38,990.00
- Pekerjaan Talang Seng Plat BJLS.20 H.17 72.00 M' 125,775.00
- List plang 3/30 SNI-6.6.49 72.00 M' 46,750.00
REKAPITULASI
I. PEKERJAAN PERSIAPAN
II. PEKERJAAN TANAH
III. PEKERJAAN BATU/BETON
IV. PEKERJAAN KAYU
V. PEKERJAAN ATAP
VI PEKERJAAN KUNCI/PENGGANTUNG
VII. PEKERJAAN SANITAIR
VIII. PEKERJAAN PENGECATAN
IX PEKERJAAN LISTRIK
Jumlah
PPN 10%
Jumlah Total
Pembulatan
TAUFIK HERMAN
Direktur
REKAPITULASI
TAUFIK HERMAN
Direktur
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00
4.0000 Kg Paku 19,000.00 76,000.00
2.0000 Lt Minyak bekisting 5,000.00 10,000.00
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00
4.5000 Kg kawat beton 17,300.00 77,850.00
323.0000 Kg Semen PC 1,496.00 483,208.00
0.5200 M3 Pasir beton 149,000.00 77,480.00
0.7800 M3 Koral beton 152,000.00 118,560.00
0.1500 M3 Balok kayu 1,500,000.00 225,000.00
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00
20.0000 Btg Kayu Dolken 20,000.00 400,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00 79,000.00
0.2280 Zak Semen PC 74,800.00 17,054.40
0.0300 Zak Semen Putih 22,800.00 684.00
0.0420 M3 Pasir Pasang 149,000.00 6,258.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00
0.3500 Ls Perlengkapan 3,150.00 1,102.50
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
10,102.50
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00
0.3500 Ls Perlengkapan 28,770.00 10,069.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
12,750.00
6,500.00
19,250.00
6,000.00
9,500.00
741.00
25,000.00
520.00
4,250.00
260.00
46,271.00
63,920.00
3,250.00
67,170.00
31,960.00
1,690.00
33,650.00
66,000.00
25,500.00
1,300.00
92,800.00
154,800.00
25,500.00
1,300.00
181,600.00
188,400.00
38,700.00
48,750.00
5,070.00
66,300.00
5,070.00
352,290.00
73,500.00
21,467.60
5,960.00
12,500.00
1,300.00
27,200.00
1,950.00
143,877.60
73,500.00
14,511.20
7,301.00
12,500.00
1,300.00
27,200.00
1,950.00
138,262.20
38,350.00
19,148.80
2,980.00
12,500.00
1,300.00
25,500.00
1,950.00
101,728.80
38,350.00
38,297.60
2,980.00
18,750.00
1,950.00
29,750.00
2,340.00
132,417.60
412,250.00
43,750.00
195,000.00
175,000.00
43,030.00
22,100.00
405,000.00
38,000.00
3,000.00
2,180,000.00
51,900.00
483,208.00
77,480.00
118,560.00
4,248,278.00
600,000.00
76,000.00
10,000.00
1,635,000.00
77,850.00
483,208.00
77,480.00
118,560.00
225,000.00
428,750.00
400,000.00
5,577,698.00
132,240.00
77,480.00
326,128.00
31,250.00
3,250.00
140,250.00
10,400.00
720,998.00
6,688.00
3,874.00
14,960.00
2,500.00
260.00
97,750.00
780.00
126,812.00
12,716.00
2,533.00
18,750.00
1,950.00
17,000.00
1,300.00
54,249.00
6,432.80
3,278.00
18,750.00
1,950.00
17,000.00
1,300.00
48,710.80
79,000.00
17,054.40
684.00
6,258.00
43,750.00
4,550.00
52,700.00
3,900.00
207,896.40
-
2,086.00
20,944.00
16,250.00
1,690.00
22,950.00
1,820.00
65,740.00
2,200,000.00
381,000.00
15,200.00
1,500,000.00
156,000.00
340,000.00
26,000.00
4,618,200.00
24,000.00
2,850.00
12,500.00
1,300.00
8,500.00
7,150.00
56,300.00
21,600.00
1,900.00
18,750.00
1,950.00
12,750.00
7,150.00
64,100.00
35,900.00
570.00
12,500.00
1,300.00
5,950.00
455.00
56,675.00
120,775.00
2,400,000.00
2,250,000.00
260,000.00
510,000.00
39,000.00
5,459,000.00
22,000.00
950.00
12,500.00
1,300.00
9,350.00
650.00
46,750.00
8,800.00
570.00
12,500.00
130.00
8,500.00
650.00
31,150.00
80,000.00
312,500.00
32,500.00
85,000.00
6,500.00
516,500.00
70,000.00
52,020.00
250,000.00
26,000.00
68,000.00
5,200.00
471,220.00
47,500.00
1,900.00
18,750.00
1,950.00
8,500.00
6,500.00
85,100.00
39,200.00
71,800.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
39,200.00
71,800.00
34,650.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
484,320.00
16,940.00
2,220.00
8,375.00
910.00
11,900.00
910.00
41,255.00
51,450.00
740.00
15,625.00
1,690.00
7,140.00
520.00
77,165.00
37,590.00
410.00
7,500.00
780.00
10,200.00
780.00
57,260.00
14,850.00
820.00
8,750.00
1,040.00
12,750.00
780.00
38,990.00
95,700.00
18,750.00
1,950.00
12,750.00
97.50
129,247.50
79,200.00
18,750.00
1,950.00
12,750.00
97.50
112,747.50
5,800.00
2,635.00
21,000.00
2,700.00
1,800.00
700.00
1,125.00
780.00
5,950.00
1,170.00
43,660.00
700.00
1,725.00
125.00
13.00
12,750.00
325.00
15,638.00
4,200.00
4,250.00
780.00
9,230.00
9,000.00
1,102.50
7,500.00
780.00
3,060.00
234.00
21,676.50
82,200.00
10,069.50
16,875.00
1,755.00
6,885.00
533.00
118,317.50
85,800.00
10,510.50
16,875.00
1,755.00
6,885.00
533.00
122,358.50
272,500.00
7,350.00
8,976.00
1,490.00
187,500.00
39,000.00
85,000.00
14,300.00
616,116.00
33,500.00
1,085.40
187,500.00
39,000.00
85,000.00
14,300.00
360,385.40
210,000.00
62,500.00
1,300.00
850.00
650.00
275,300.00
10,000.00
18,750.00
1,950.00
1,275.00
104.00
32,079.00
5,000.00
18,750.00
1,950.00
1,275.00
104.00
27,079.00
12,000.00
18,750.00
1,950.00
1,275.00
104.00
34,079.00
8,000.00
18,750.00
1,950.00
1,275.00
104.00
30,079.00
123,750.00
160,000.00
9,500.00
625,000.00
65,000.00
255,000.00
19,500.00
1,257,750.00
125,775.00
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
II. BAHAN
I. PEKERJAAN PERSIAPAN
1. Pembersihan Lapangan SNI-1.6.8 12.00 M2 19,250.00 231,000.00
231,000.00
II. PEKERJAAN TANAH
1. Galian Tanah SNI-2.6.1 0.90 M3 67,170.00 60,453.00
2. Urugan Tanah Bawah Lantai & Urugan Pondasi SNI-2.6.9 1.40 M3 33,650.00 47,110.00
3. Galian Tanah untuk sumur :
- Kedalaman 0-2 m' SNI.2.6.1(2X) 1.90 M3 134,340.00 255,246.00
- Kedalaman 2-4 m' SNI.2.6.1(4X) 1.90 M3 268,680.00 510,492.00
- Kedalaman 4-6 m' SNI.2.6.1(8X) 1.55 M3 537,360.00 832,908.00
- Kedalaman 6-8 m' SNI.2.6.1(16X) 1.55 M3 1,074,720.00 1,665,816.00
- Kedalaman 8-10 m' SNI.2.6.1(32X) 0.62 M3 2,149,440.00 1,332,652.80
4,704,677.80
III. PEKERJAAN BATU/BETON
1. Beton Untuk Pondasi SNI-6.1.1 0.32 M3 720,998.00 230,719.36
2. Beton Untuk Lantai SNI-6.1.1 0.48 M3 720,998.00 346,079.04
3. Pas. Dinding Lantai Batu Bataco 1 : 5 SNI-4.6.25 5.44 M2 101,728.80 553,404.67
4. Plesteran Dinding Lantai 1 : 5 SNI-5.6.5 2.52 M2 48,710.80 122,751.22
5. Beton Untuk Cincin Sumur SNI-6.1.1 1.41 M3 704,887.00 993,890.67
6. Bekisting SNI-7.6.29 0.05 M3 135,136.63 6,756.83
7. Plesteran bag. luar dan cincin bag. atas SNI-5.6.5 3.15 M2 43,061.46 135,643.59
8. Acian bag. luar pondasi dan cincin bag. atas SNI-5.6.5 a 3.15 M2 16,789.13 52,885.77
2,442,131.14
IV. PEKERJAAN LAIN-LAIN
1. Pekerjaan Tiang Kerekan Diskor Besi Strip Ls 1.00 Unit 150,000.00 150,000.00
(Kayu Balok 10x10, Tinggi 2 M)
2. Kerekan Besi dan Penggantung Ls 1.00 Unit 125,000.00 125,000.00
3. Tali Kerekan Ls 12.00 M' 7,000.00 84,000.00
4. Ember Ls 1.00 Bh 15,000.00 15,000.00
5. Pengeteeran Tiang Kerekan Ls 1.00 Unit 25,000.00 25,000.00
6. Pengurasan Sumur Ls - Unit 150,000.00 -
7. Kerangka Dinding F.22 - M3 5,333,862.85 -
8. Dinding Papan F.38 - M2 117,013.28 -
399,000.00
REKAPITULASI
I. PEKERJAAN PERSIAPAN 231,000.00
II. PEKERJAAN TANAH 4,704,677.80
III. PEKERJAAN BATU/BETON 2,442,131.14
IV. PEKERJAAN LAIN-LAIN 399,000.00
Jumlah 7,776,808.94
PPN 10% 777,680.89
Jumlah Total 8,554,489.84
Pembulatan 8,550,000.00
BAHAN :
0.4000 M3 Papan Kayu Klas III 1,500,000.00 600,000.00
4.0000 Kg Paku 19,000.00 76,000.00
2.0000 Lt Minyak bekisting 5,000.00 10,000.00
150.0000 Kg Besi beton polos 10,900.00 1,635,000.00
4.5000 Kg kawat beton 17,300.00 77,850.00
323.0000 Kg Semen PC 1,496.00 483,208.00
0.5200 M3 Pasir beton 149,000.00 77,480.00
0.7800 M3 Koral beton 152,000.00 118,560.00
0.1500 M3 Balok kayu 1,500,000.00 225,000.00
3.5000 Lbr Plywood 9 mm 122,500.00 428,750.00
20.0000 Btg Kayu Dolken 20,000.00 400,000.00
V. PEKERJAAN LANTAI
SNI-13.6.47 1 M2 Pasangan Tegel Keramik 30 X 30
1.0000 M2 Tegel Keramik 79,000.00 79,000.00
0.2280 Zak Semen PC 74,800.00 17,054.40
0.0300 Zak Semen Putih 22,800.00 684.00
0.0420 M3 Pasir Pasang 149,000.00 6,258.00
0.3500 Oh Tukang Batu 125,000.00 43,750.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.6200 Oh Pekerja 85,000.00 52,700.00
0.0300 Oh Mandor 130,000.00 3,900.00
1 M2 Plafond Trilek =
X. PEKERJAAN SANITASI
SNI-11.6.20 1 M ' Pasangan Pipa Air Bersih Pipa PVC Dia 3/4 Inchi
1.2000 M' Pipa dia 3/4 " 7,500.00 9,000.00
0.3500 Ls Perlengkapan 3,150.00 1,102.50
0.0600 Oh Tukang 125,000.00 7,500.00
0.0060 Oh Kepala Tukang 130,000.00 780.00
0.0360 Oh Pekerja 85,000.00 3,060.00
0.0018 Oh Mandor 130,000.00 234.00
10,102.50
SNI-11.6.31 1M' Pasangan Pipa Air Kotor Pipa PVC Dia 4 Inchi
1.2000 M' Pipa dia 4 " 68,500.00 82,200.00
0.3500 Ls Perlengkapan 28,770.00 10,069.50
0.1350 Oh Tukang Batu 125,000.00 16,875.00
0.0135 Oh Kepala Tukang 130,000.00 1,755.00
0.0810 Oh Pekerja 85,000.00 6,885.00
0.0041 Oh Mandor 130,000.00 533.00
12,750.00
6,500.00
19,250.00
6,000.00
9,500.00
741.00
25,000.00
520.00
4,250.00
260.00
46,271.00
63,920.00
3,250.00
67,170.00
31,960.00
1,690.00
33,650.00
66,000.00
25,500.00
1,300.00
92,800.00
154,800.00
25,500.00
1,300.00
181,600.00
188,400.00
38,700.00
48,750.00
5,070.00
66,300.00
5,070.00
352,290.00
73,500.00
21,467.60
5,960.00
12,500.00
1,300.00
27,200.00
1,950.00
143,877.60
73,500.00
14,511.20
7,301.00
12,500.00
1,300.00
27,200.00
1,950.00
138,262.20
38,350.00
19,148.80
2,980.00
12,500.00
1,300.00
25,500.00
1,950.00
101,728.80
38,350.00
38,297.60
2,980.00
18,750.00
1,950.00
29,750.00
2,340.00
132,417.60
412,250.00
43,750.00
195,000.00
175,000.00
43,030.00
22,100.00
405,000.00
38,000.00
3,000.00
2,180,000.00
51,900.00
483,208.00
77,480.00
118,560.00
4,248,278.00
600,000.00
76,000.00
10,000.00
1,635,000.00
77,850.00
483,208.00
77,480.00
118,560.00
225,000.00
428,750.00
400,000.00
5,577,698.00
132,240.00
77,480.00
326,128.00
31,250.00
3,250.00
140,250.00
10,400.00
720,998.00
6,688.00
3,874.00
14,960.00
2,500.00
260.00
97,750.00
780.00
126,812.00
12,716.00
2,533.00
18,750.00
1,950.00
17,000.00
1,300.00
54,249.00
6,432.80
3,278.00
18,750.00
1,950.00
17,000.00
1,300.00
48,710.80
79,000.00
17,054.40
684.00
6,258.00
43,750.00
4,550.00
52,700.00
3,900.00
207,896.40
-
2,086.00
20,944.00
16,250.00
1,690.00
22,950.00
1,820.00
65,740.00
2,200,000.00
381,000.00
15,200.00
1,500,000.00
156,000.00
340,000.00
26,000.00
4,618,200.00
24,000.00
2,850.00
12,500.00
1,300.00
8,500.00
7,150.00
56,300.00
21,600.00
1,900.00
18,750.00
1,950.00
12,750.00
7,150.00
64,100.00
35,900.00
570.00
12,500.00
1,300.00
5,950.00
455.00
56,675.00
120,775.00
2,400,000.00
2,250,000.00
260,000.00
510,000.00
39,000.00
5,459,000.00
22,000.00
950.00
12,500.00
1,300.00
9,350.00
650.00
46,750.00
8,800.00
570.00
12,500.00
130.00
8,500.00
650.00
31,150.00
80,000.00
312,500.00
32,500.00
85,000.00
6,500.00
516,500.00
70,000.00
52,020.00
250,000.00
26,000.00
68,000.00
5,200.00
471,220.00
47,500.00
1,900.00
18,750.00
1,950.00
8,500.00
6,500.00
85,100.00
39,200.00
71,800.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
39,200.00
71,800.00
34,650.00
570.00
7,200.00
250,000.00
26,000.00
51,000.00
3,900.00
484,320.00
16,940.00
2,220.00
8,375.00
910.00
11,900.00
910.00
41,255.00
51,450.00
740.00
15,625.00
1,690.00
7,140.00
520.00
77,165.00
37,590.00
410.00
7,500.00
780.00
10,200.00
780.00
57,260.00
14,850.00
820.00
8,750.00
1,040.00
12,750.00
780.00
38,990.00
95,700.00
18,750.00
1,950.00
12,750.00
97.50
129,247.50
79,200.00
18,750.00
1,950.00
12,750.00
97.50
112,747.50
5,800.00
2,635.00
21,000.00
2,700.00
1,800.00
700.00
1,125.00
780.00
5,950.00
1,170.00
43,660.00
700.00
1,725.00
125.00
13.00
12,750.00
325.00
15,638.00
4,200.00
4,250.00
780.00
9,230.00
9,000.00
1,102.50
7,500.00
780.00
3,060.00
234.00
21,676.50
82,200.00
10,069.50
16,875.00
1,755.00
6,885.00
533.00
118,317.50
85,800.00
10,510.50
16,875.00
1,755.00
6,885.00
533.00
122,358.50
272,500.00
7,350.00
8,976.00
1,490.00
187,500.00
39,000.00
85,000.00
14,300.00
616,116.00
33,500.00
1,085.40
187,500.00
39,000.00
85,000.00
14,300.00
360,385.40
210,000.00
62,500.00
1,300.00
850.00
650.00
275,300.00
10,000.00
18,750.00
1,950.00
1,275.00
104.00
32,079.00
5,000.00
18,750.00
1,950.00
1,275.00
104.00
27,079.00
12,000.00
18,750.00
1,950.00
1,275.00
104.00
34,079.00
8,000.00
18,750.00
1,950.00
1,275.00
104.00
30,079.00
123,750.00
160,000.00
9,500.00
625,000.00
65,000.00
255,000.00
19,500.00
1,257,750.00
125,775.00
HARGA
NO JENIS UPAH DAN BAHAN SATUAN
( Rp.)
I. UPAH
II. BAHAN
06. RAB Sumur Gali (APBN) H. Bahan Dan Upah Halaman 11 Dari 12
QUARY TRANSPORT HARGA
NO JENIS UPAH DAN BAHAN SATUAN
(RP) (RP) ( Rp.)
27 KERAMIK 20/20 CM M2 80,000 4,000 84,000
28 TEGEL PC ABU ABU 20 X 20 M2 80,000 4,000 84,000
29 KACA 3 MM M2 65,000 7,000 72,000
30 KACA 5 MM M2 80,000 7,000 87,000
31 TALANG FIBER GLASS M' 14,000 3,000 17,000
32 SENG GELOMBANG BJLS 20 BDR 11 LBR 51,200 2,500 53,700
33 SENG PLAT BJLS 20 LBR 47,000 2,500 49,500
34 ASBES GELOMBANG ( 210 X 105 CM ) LBR 35,000 3,500 38,500
35 BUBUNGAN ASBES ( NOK SET ) PSG 21,000 3,500 24,500
###
36 PAKU KG 18,500 500 19,000
37 PAKU SENG KG 20,000 500 20,500
38 PAKU ASBES / ULIR KG 18,000 500 18,500
39 PAKU TRIPLEKS KG 23,000 500 23,500
40 PAKU JEMBATAN KG 27,000 500 27,500
41 CAT MENIE KG 28,000 1,000 29,000
42 CAT KAYU ( PLATON / SEJENIS ) KG 60,000 - 60,000
43 LEM KAYU KG 24,000 - 24,000
44 MINYAK CAT LITER 18,000 - 18,000
45 PLAMUR KG 18,000 - 18,000
46 CAT TEMBOK KG 15,500 - 15,500
47 CAT DASAR TL KG 15,500 - 15,500
48 RESIDU KG 12,000 - 12,000
49 KUNCI TANAM (CHIKA BROWN / SEJENIS) BH 120,000 - 120,000
50 ENGSEL PINTU BH 10,000 - 10,000
51 ENGSEL JENDELA BH 10,000 - 10,000
52 GERENDEL PINTU BH 12,000 - 12,000
53 GERENDEL JENDELA BH 8,000 - 8,000
54 ANGKUR/BAUT/SENGKANG/STRIP BH 8,000 - 8,000
55 KAIT ANGIN BH 5,000 - 5,000
56 KLOSET JONGKOK (American standar) BH 265,000 7,500 272,500
57 BAK AIR FIBBERGLASS BH 26,000 7,500 33,500
58 SALURAN AIR BERSIH ( PVC 3/4" ) M' 6,000 1,500 7,500
59 SALURAN AIR KOTOR ( PVC 4" ) M' 67,000 1,500 68,500
60 PIPA GI MEDIUM (1 1/2") M' 70,000 1,500 71,500
61 TITIK LAMPU TITIK 222,000 - 222,000
62 STOP KONTAK TITIK 222,000 - 222,000
63 SAKLAR BH 25,000 - 25,000
64 ZEKRING BOKS GROUP LOKAL BH 200,000 - 200,000
65 ESPANYOLET ( KUNCI GUDANG ) BH 210,000 - 210,000
66 GEMBOK RUMAH (LENGKAP) KG 45,000 - 45,000
67 KAPUR SIRIH KG 10,000 1,500 11,500
68 PINTU PANIL 80 x 200 cm UNIT 650,000 4,000 654,000
69 PINTU TRIPLEK MIKA 70 x 200 cm UNIT 230,000 4,000 234,000
70 GANTUNGAN TALANG (BESI) BH 5,000 - 5,000
71 PIPA PCV 4" - 3 M + KENIE UNIT 95,000 4,000 99,000
###
72 AMPLAS LBR 7,000 - 7,000
73 KAWAT RAM (TERPASANG) BH 25,000 - 25,000
74 BAK AIR VIBRE GLASS 60 x 60 x 69 CM BH 230,000 4,000 234,000
75 IJUK KG 10,000 - 10,000
###
76 SIRTU M3 97,500 37,500 135,000
77 TIANG KEREKAN UNIT 120,000 - 120,000
78 KEREKAN BESI DAN PENGGANTUNG UNIT 100,000 - 100,000
79 TALI KEREKAN M1 8,000 - 8,000
80 EMBER KECIL BH 10,000 - 10,000
81 EMBER PAKAI PENUTUP KAP. 80 LITER BH 145,000 - 145,000
82 KAYU BULAT DIA 20 - 25 CM (TIANG JEMBATA M' 12,000 - 12,000
83 PRIMCOAT Kg 15,000 - 15,000
06. RAB Sumur Gali (APBN) H. Bahan Dan Upah Halaman 12 Dari 12
QUARY TRANSPORT HARGA
NO JENIS UPAH DAN BAHAN SATUAN
(RP) (RP) ( Rp.)
06. RAB Sumur Gali (APBN) H. Bahan Dan Upah Halaman 13 Dari 12
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Permukiman Transmigrasi Tahun Anggaran 2018
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1 (APBN)
Satuan Kerja : Dinas Sosial, Tenaga Kerja Dan Transmigrasi Kabupaten Sijunjung
Propinsi/Kab. : Sumatera Barat/Sijunjung
Lokasi : Padang Tarok SP 1, Kecamatan Kamang Baru
Sub Pekerjaan : Pembangunan Jalan Lingkungan/Desa
a b c d
DIV.1 UMUM
1.2 Mobilisasi Dan Demobilisasi Ls 1.0
TAUFIK HERMAN
RAB)
e f = (d x e)
33,990,000.00 33,990,000.00
27,855.40 89,606,083.37
78,446.02 10,001,867.96
2,407.57 9,630,263.80
188,018.24 56,405,471.94
(A) 199,633,687.07
###
(B) = 10% x (A) 19,963,368.71
###
(C) = (A) + (B) 219,597,055.78
###
(D) 219,590,000.00
TAUFIK HERMAN
Direktur
RENCANA ANGGARAN BIAYA (RAB)
a b c d e
DIV.7 STRUKTUR
7.1.(7) Beton mutu sedang dengan fc' = 20 Mpa (K-250) M3 4.80 911,453.87
7.1.(8)a Beton mutu sedang dengan fc' = 15 Mpa (K-175) M3 2.40 874,504.64
7.3.(1) Baja Tulangan BJ 24 Polos Kg 690.20 16,810.95
7.9.a Pasangan Batu (Manual) M3 74.83 764,900.85
BM2 Plesteran M2 39.84 57,858.85
BM3 Pemasangan Bowplank M1 17.60 40,441.28
BM7 Pengecatan Dengan Cat Tembok M2 4.50 50,215.66
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (A)
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (B) = 10% x (A)
(C) Jumlah Total Harga Pekerjaan = (A) + (B) bentang 3 M' (C) = (A) + (B)
(D) Jumlah Total Harga Pekerjaan untuk 1 M' (D) = (C )/3
(D) Pembulatan (E )
TAUFIK HERMAN
Direktur
Jumlah Harga
(Rp.)
f = (d x e)
925,207.67
1,866,396.72
2,030,596.99 2.10
4,374,978.56
2,098,811.14
11,602,920.65
57,237,530.70
2,305,096.40
711,766.53
225,970.47
83,379,275.83
###
8,337,927.58
###
91,717,203.41
###
30,572,401.14 30,000,000.00
30,570,000.00 570,000.00
g, 8 Juni 2018
BHAKTI SERUMPUN
IK HERMAN
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Permukiman Transmigrasi Tahun Anggaran 2018
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1 (APBN)
Satuan Kerja : Dinas Sosial, Tenaga Kerja Dan Transmigrasi Kabupaten Sijunjung
Propinsi/Kab. : Sumatera Barat/Sijunjung
Lokasi : Padang Tarok SP 1, Kecamatan Kamang Baru
Sub Pekerjaan : Jembatan Kayu Panjang 6 Meter
a b c d e
DIV.1 UMUM
01.03 Pekerjaan Persiapan dan Pendahuluan Ls 1.0 160,000.00
DIV. 7 STRUKTUR
7.1.(7) Beton mutu sedang dengan fc' = 20 Mpa (K-250) M3 2.88 911,453.87
7.3.(1) Baja Tulangan BJ 24 Polos Kg 397.20 16,810.95
7.5.(1) Lantai Kayu Jembatan M3 3.36 425,130.39
7.5.(2) Struktur Jembatan Kayu M3 5.60 3,547,148.22
7.5.(2) Struktur Kayu Tiang Sandaran Jembatan M3 0.39 3,547,148.22
7.9.a Pasangan Batu (Manual) M3 94.56 764,900.85
BM2 Plesteran M2 135.00 57,858.85
BM3 Pemasangan Bowplank M1 24.00 40,441.28
BM6 Pengecatan Dengan Cat Tembok M2 89.58 50,215.66
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (A)
(B) Jumlah Harga Pekerjaan Permeter (Panjang 6 Meter) (B) = (A)/6
(C) Pajak Pertambahan Nilai ( PPN )/Meter (C) = 10% x (B)
(D) Jumlah Total Harga Pekerjaan/Meter (D) = (B) + (C )
(E) Pembulatan/Meter (E )
TAUFIK HERMAN
Direktur
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Sumatera Barat/Sijunjung
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1
Sub Pek. : Pembangunan Jalan Penghubung/Poros
Lokasi : #REF!
a b c d e
I. PEKERJAAN PERSIAPAN
- 0
0
0 0
0 0
Jumlah Harga
(Rp.)
f = (d x e)
160,000.00
3,292,018.01
12,216,414.91
2,624,987.13
6,677,311.04
1,428,438.11
19,864,030.03
1,383,387.81
72,329,024.50
7,810,944.13
970,590.72
4,498,318.82
133,255,465.21
###
22,209,244.20
2,220,924.42
###
24,430,168.62
###
24,430,000.00
g, 8 Juni 2018
BHAKTI SERUMPUN
IK HERMAN
Jumlah Harga
(Rp.)
f = (d x e)
53,388,500.00
8,145,565.25
#REF!
3,362,190.86
9,811,192.93
2,975,912,720.00
3,654,620.70
22,597,047.00
#REF!
###
#REF!
###
#REF!
###
#REF!
0
0
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Permukiman Transmigrasi Tahun Anggaran 2018
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1 (APBN)
Satuan Kerja : Dinas Sosial, Tenaga Kerja Dan Transmigrasi Kabupaten Sijunjung
Propinsi/Kab. : Sumatera Barat/Sijunjung
Lokasi : Padang Tarok SP 1, Kecamatan Kamang Baru
Sub Pekerjaan : Gorong-gorong Dia. 80 cm Lengkap Dengan Pasangan Batu Pengunci
a b c d e
DIV.1 UMUM
01.03 Pekerjaan persiapan dan pendahuluan Ls 1.00 150,000.00
DIV.2 DRAINASE
2.3.(3) Gorong2 Pipa Beton Bertulang, Ø 75 cm s/d 100 cm M3 7.00 1,279,840.91
DIV. 7 STRUKTUR
7.9.a Pasangan Batu (Manual) M3 10.50 764,900.85
BM2 Plesteran M2 17.10 57,858.85
BM7 Pengecatan Dengan Cat Tembok M2 17.10 50,215.66
TAUFIK HERMAN
Direktur
Jumlah Harga
(Rp.)
f = (d x e)
150,000.00
8,958,886.34
968,240.59
268,861.31
1,018,034.58
8,031,458.94
989,386.26
858,687.79
21,243,555.79
###
3,034,793.68
303,479.37
###
3,338,273.05
###
3,330,000.00
g, 8 Juni 2018
BHAKTI SERUMPUN
IK HERMAN
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Permukiman Transmigrasi Tahun Anggaran 2018
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1 (APBN)
Satuan Kerja : Dinas Sosial, Tenaga Kerja Dan Transmigrasi Kabupaten Sijunjung
Propinsi/Kab. : Sumatera Barat/Sijunjung
Lokasi : Padang Tarok SP 1, Kecamatan Kamang Baru
Sub Pekerjaan : Tebas Tebang Potong
a b c d e
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (A)
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (B) = 10% x (A)
(C) Jumlah Total Harga Pekerjaan = (A) + (B) (C) = (A) + (B)
(D) Pembulatan (D)
TAUFIK HERMAN
Direktur
Jumlah Harga
(Rp.)
f = (d x e)
2,721,286.13
2,721,286.13
###
272,128.61
###
2,993,414.74
###
2,993,000.00
g, 8 Juni 2018
BHAKTI SERUMPUN
IK HERMAN
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : Pembangunan Permukiman Transmigrasi Tahun Anggaran 2018
Pekerjaan : Pembangunan Permukiman Transmigrasi Padang Tarok SP1 (APBN)
Satuan Kerja : Dinas Sosial, Tenaga Kerja Dan Transmigrasi Kabupaten Sijunjung
Propinsi/Kab. : Sumatera Barat/Sijunjung
Lokasi : Padang Tarok SP 1, Kecamatan Kamang Baru
Sub Pekerjaan : Pilah Kumpul Bersih
a b c d e
(A) Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan ) (A)
(B) Pajak Pertambahan Nilai ( PPN ) = 10% x (A) (B) = 10% x (A)
(C) Jumlah Total Harga Pekerjaan = (A) + (B) (C) = (A) + (B)
(D) Pembulatan (D)
TAUFIK HERMAN
Direktur
Jumlah Harga
(Rp.)
f = (d x e)
3,219,301.73
3,219,301.73
###
321,930.17
###
3,541,231.91
###
3,541,000.00
g, 8 Juni 2018
BHAKTI SERUMPUN
IK HERMAN
HARGA SATUAN PEKERJAAN
a b c
DIV.1 UMUM
1.2 Mobilisasi Dan Demobilisasi Ls
1.3 Pengaturan Lalu Lintas Ls
DIV.2 DRAINASE
2.1. Galian Untuk Selokan Drainase dan Saluran Air M3
2.2 Pasangan Batu dengan Mortar Untuk Saluran M3
2.3.(2) Gorong2 Beton Bertulang, Ø 50 cm s/d 75 cm M1
2.3.(3) Gorong2 Pipa Beton Bertulang, Ø 75 cm s/d 100 cm M1
2.3.(4) Gorong2 Pipa Beton Bertulang, Ø 95 s/d 120 cm M1
2.3.(7) Gorong2 Pipa Baja Bergelombang dengan dimensi …… Ton
2.4.(1) Timbunan Porous atau Bahan Penyaring M3
a b c
DIV.7 STRUKTUR
7.1.(7) Beton mutu sedang dengan fc'= 20 MPa (K-250) M3
7.1.(8)a Beton mutu sedang dengan fc'= 15 MPa (K-175) M3
7.1.(8)b Beton Siklop mutu sedang dg fc'= 15 MPa (K-175) M3
7.1.(10) Beton mutu rendah dengan fc'= 10 MPa (K125) M3
7.3.(1) Baja Tulangan BJ 24 Polos Kg
7.3.4 Baja Tulangan BJ 32 Ulir Kg
7.4.(1) Baja Struktur, Titik Leleh 250 MPa, Penye. & Pemas. Kg
7.4.(2)a Baja Struktur, Titik Leleh 290 MPa, Penye. & Pemas. Kg
7.4.(2)b Baja Struktur, Titik Leleh 290 MPa, Penye. & Pemas. Kg
Tanpa Pengelasan
7.5.(1) Lantai Kayu Jembatan M3
7.5.(2) Struktur Jembatan Kayu M3
7.9.a Pasangan Batu (Manual) M3
7.9.b Pasangan Batu (Mekanik) M4
7.10.(3) Bronjong (Gabions) M3
7.12.(1) Landasan Plat perletakan 30 x 40cm tebal 1 cm Buah
7.15.(1) Pembongkaran Pasangan Batu (Manual) M3
7.15.(2)a Pembongkaran Beton (Mekanik) M3
7.15.(2)b Pembongkaran Beton (Manual) M3
7.15.(6) Pembongkaran Gelagar Baja M1
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2
7.17 Pipa Cucuran Buangan Jembatan Diameter 3" M1
BM1 Acuan Beton ( Bekisting ) M2
BM2 Plesteran M2
BM3 Pemasangan Bowplank M1
BM4 Pengeringan Hari
BM5 Pemasangan Kisdam Karung Pasir Tinggi 2 m M1
BM6 Pengecatan Dengan Cat Perak M2
BM7 Pengecatan Dengan Cat Tembok M2
BM8 Pengecatan Dengan Menie Besi M2
BM9 Baut Pelat Sambungan Baja Mutu Tinggi Buah
BM10 Pipa Galanis 3" dan Aksesoris u/ Tangan2 Jembatan M1
a b c
9.1.(4) Dump Truck Jam
9.1.(8) Motor Grader Jam
9.1.(9) Wheel Loader Jam
9.1.(11) Excavator Jam
9.1.(14) Vibro Roller Jam
DIV.1 UMUM
1.2 Mobilisasi Dan Demobilisasi Ls 33,990,000.00
1.3 Pengaturan Lalu Lintas Ls 6,698,000.00
DIV.2 DRAINASE
2.1. Galian Untuk Selokan Drainase dan Saluran Air M3 36,829.98
2.2 Pasangan Batu dengan Mortar Untuk Saluran M3 810,135.32
2.3.(2) Gorong2 Beton Bertulang, Ø 50 cm s/d 75 cm M1 1,031,525.06
2.3.(3) Gorong2 Pipa Beton Bertulang, Ø 75 cm s/d 100 cm M1 1,279,840.91
2.3.(4) Gorong2 Pipa Beton Bertulang, Ø 95 s/d 120 cm M1 1,399,604.37
2.3.(7) Gorong2 Pipa Baja Bergelombang dengan dimensi …… Ton 20,479,295.61
2.4.(1) Timbunan Porous atau Bahan Penyaring M3 302,127.89
DIV.7 STRUKTUR
7.1.(7) Beton mutu sedang dengan fc'= 20 MPa (K-250) M3 911,453.87
7.1.(8)a Beton mutu sedang dengan fc'= 15 MPa (K-175) M3 874,504.64
7.1.(8)b Beton Siklop mutu sedang dg fc'= 15 MPa (K-175) M3 905,750.73
7.1.(10) Beton mutu rendah dengan fc'= 10 MPa (K125) M3 771,660.93
7.3.(1) Baja Tulangan BJ 24 Polos Kg 16,810.95
7.3.4 Baja Tulangan BJ 32 Ulir Kg 16,810.95
7.4.(1) Baja Struktur, Titik Leleh 250 MPa, Penye. & Pemas. Kg 20,217.24
7.4.(2)a Baja Struktur, Titik Leleh 290 MPa, Penye. & Pemas. Kg 20,767.24
7.4.(2)b Baja Struktur, Titik Leleh 290 MPa, Penye. & Pemas. Kg 18,931.00
Tanpa Pengelasan
7.5.(1) Lantai Kayu Jembatan M3 425,130.39
7.5.(2) Struktur Jembatan Kayu M3 3,547,148.22
7.9.a Pasangan Batu (Manual) M3 764,900.85
7.9.b Pasangan Batu (Mekanik) M4 724,683.44
7.10.(3) Bronjong (Gabions) M3 678,009.75
7.12.(1) Landasan Plat perletakan 30 x 40cm tebal 1 cm Buah 320,000.00
7.15.(1) Pembongkaran Pasangan Batu (Manual) M3 178,200.00
7.15.(2)a Pembongkaran Beton (Mekanik) M3 120,261.11
7.15.(2)b Pembongkaran Beton (Manual) M3 218,815.38
7.15.(6) Pembongkaran Gelagar Baja M1 116,600.00
7.15.(7) Pembongkaran Lantai Jembatan Kayu M2 67,038.89
7.17 Pipa Cucuran Buangan Jembatan Diameter 3" M1 77,090.96
BM1 Acuan Beton ( Bekisting ) M2 77,950.40
BM2 Plesteran M2 57,858.85
BM3 Pemasangan Bowplank M1 40,441.28
BM4 Pengeringan Hari 744,792.47
BM5 Pemasangan Kisdam Karung Pasir Tinggi 2 m M1 801,152.00
BM6 Pengecatan Dengan Cat Perak M2 62,374.80
BM7 Pengecatan Dengan Cat Tembok M2 50,215.66
BM8 Pengecatan Dengan Menie Besi M2 37,269.90
BM9 Baut Pelat Sambungan Baja Mutu Tinggi Buah 17,190.00
BM10 Pipa Galanis 3" dan Aksesoris u/ Tangan2 Jembatan M1 76,939.50
TAUFIK HERMAN
Direktur
DAFTAR HARGA DASAR SATUAN UPAH
HARGA
No. URAIAN KODE SATUAN SATUAN/JAM KET
( Rp.)
HARGA
No. URAIAN KODE SATUAN TERMASUK KET
PAJAK (Rp.)
N PABRIK
Page 42
Alat
BIAYA
HARGA SEWA KET.
ALAT ALAT/JAM
(di luar PPN)
Page 43
ANALISA HARGA LUMP SUM UNTUK MOBILISASI
JUMLAH
B. MOBILISASI PERALATAN
(Sesuai Lampiran 1) Ls 1.00 15,450,000.00
JUMLAH
C FASILITAS KONTRAKTOR
1. Base Camp m2 - -
2. Kantor m2 - -
3. Workshop m2 - -
4. Gudang dan Lain - Lain m2 - -
5. Generator Set Set - -
JUMLAH
D FASILITAS DIREKSI
TEKNIS
1. Kantor m2 - -
2. Bangunan laboratorium m2 - -
3. Peralatan Laboratorium Unit - -
4. Plank Proyek Unit - -
JUMLAH
E. DEMOBILISASI PERALATAN
(Sesuai Lampiran 1) Ls 1.00 15,450,000.00
JUMLAH
F JUMLAH ( A + B + C + D + E )
G OVERHEAD & PROFIT 10.0 % x F
H HARGA SATUAN PEKERJAAN (F+G)
Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor
mata pembayaran.
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN
yang dibayar dari kontrak) dan biaya-biaya lainnya.
80 cm dan Jembatan Kayu
JUMLAH HARGA
(Rp.)
15,450,000.00
15,450,000.00
-
-
-
-
-
-
-
-
-
15,450,000.00
15,450,000.00
30,900,000.00
3,090,000.00
33,990,000.00
n/atau ukuran
k termasuk PPN
ITEM PEMBAYARAN NO. : 1.2
JENIS PEKERJAAN : Mobilisasi
SATUAN PEMBAYARAN : Lump Sump
KODE
No. JENIS ALAT SATUAN VOL.
ALAT
B. PERALATAN
- -
- -
- -
3,000,000.00 3,000,000.00
- -
- -
- -
350,000.00 1,050,000.00
- -
3,000,000.00 6,000,000.00
- -
- -
2,100,000.00 2,100,000.00
- -
- -
- -
- -
- -
3,000,000.00 3,000,000.00
- -
- -
- -
300,000.00 300,000.00
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
15,450,000
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
HARGA SATUAN
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA SATUAN
NO. KOMPONEN SATUAN PERKIRAAN KUANTITAS
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
:
:
:
JUMLAH HARGA
(Rp.)
170,000.00
41,666.07
43,332.71
254,998.79
123,775.43
258,272.96
38,370.24
89,392.60
509,811.24
14,925.09
156,514.94
1,500.00
172,940.03
937,750.05
93,775.01
1,031,525.06
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
:
:
:
JUMLAH HARGA
(Rp.)
34,000.00
13,000.00
47,000.00
90,915.00
82,610.00
173,525.00
53,136.72
1,000.00
54,136.72
274,661.72
27,466.17
302,127.89
asi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa EI-313
A. TENAGA
B. BAHAN
C. PERALATAN
1. Excavator (E10) Jam 0.0436 409,918.12
2. Dump Truck (E08) Jam 0.0851 225,981.73
3. Alat bantu Ls 1.0000 150.00
JUMLAH HARGA PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1 Motor Grader (E13) Jam 0.0148 447,715.49
2 Vibro Roller (E19) Jam 0.0111 347,125.23
3 Water Tanker (E23) Jam 0.0078 221,923.28
4 Alat Bantu Ls 1.0000 150.00
Analisa EI-321b
A. TENAGA
B. BAHAN
Analisa EI-322
A. TENAGA
1. Pekerja (L01) Jam 0.0370 12,142.86
2. Mandor (L03) Jam 0.0185 18,571.43
B. BAHAN
C. PERALATAN
1 Motor Grader (E13) Jam 0.0185 447,715.49
2 Vibro Roller (E19) Jam 0.0111 347,125.23
3 Water Tanker (E23) Jam 0.0078 221,923.28
4 Alat Bantu Ls 1.0000 150.00
Analisa EI-33
A. TENAGA
B. BAHAN
C. PERALATAN
1. Motor Grader (E13) jam 0.0018 447,715.49
2. Vibro Roller (E19) jam 0.0033 347,125.23
3. Alat Bantu Ls 1.0000 100.00
JUMLAH HARGA
(Rp.)
1,349.07
1,032.57
2,381.64
22,791.45
150.00
22,941.45
25,323.09
2,532.31
27,855.40
an/atau ukuran
Analisa EI-313
JUMLAH HARGA
(Rp.)
1,057.64
809.71
1,867.36
0.00
17,872.43
19,231.04
150.00
37,253.47
39,120.83
3,912.08
43,032.92
an/atau ukuran
ak termasuk PPN
Analisa EI-321a
JUMLAH HARGA
(Rp.)
359.43
274.86
634.29
58,320.00
58,320.00
6,626.19
3,853.09
1,731.00
150.00
12,360.28
71,314.57
7,131.46
78,446.02
an/atau ukuran
kerjaan dari nomor
ak termasuk PPN
Analisa EI-321b
JUMLAH HARGA
(Rp.)
20,238.50
6,189.86
26,428.36
58,320.00
58,320.00
17,933.42
150.00
18,083.42
102,831.78
10,283.18
113,114.95
an/atau ukuran
ak termasuk PPN
Analisa EI-322
JUMLAH HARGA
(Rp.)
449.29
343.57
792.86
107,400.00
107,400.00
8,282.74
3,853.09
1,731.00
150.00
14,016.83
122,209.69
12,220.97
134,430.65
an/atau ukuran
ak termasuk PPN
Analisa EI-33
N
80 cm dan Jembatan Kayu
JUMLAH HARGA
(Rp.)
81.36
55.94
137.30
0.00
805.89
1,145.51
100.00
2,051.40
2,188.70
218.87
2,407.57
an/atau ukuran
ak termasuk PPN
Analisa EI-51
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH HARGA
(Rp.)
406.39
310.77
717.15
156,360.00
156,360.00
7,491.89
4,646.92
1,559.70
150.00
13,848.52
170,925.67
17,092.57
188,018.24
/atau ukuran
rjaan dari nomor
termasuk PPN
Analisa
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa E
A. TENAGA
B. BAHAN
C. PERALATAN
Analisa
A. TENAGA
B. BAHAN
C. PERALATAN
A TENAGA
1 Pekerja L01 Jam 8.0000 12,142.86
2 Tukang L02 Jam 1.6000 17,857.14
3 Mandor L04 Jam 1.6000 18,571.43
B BAHAN
1 Kayu Lantai Jembatan M19b M3 0.0720 2,601,600.00
2 Baut Kayu Lantai JembatanM59a Bh 5.0000 8,190.00
3 Residu M49 Kg 0.1200 6,570.00
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00
Analisa
A TENAGA
1 Pekerja L01 Jam 11.2000 12,142.86
2 Tukang L02 Jam 2.2400 17,857.14
3 Mandor L04 Jam 2.2400 18,571.43
B BAHAN
1 Kayu Lantai Jembatan M19b M3 1.1000 2,601,600.00
2 Baut Kayu Lantai Jembatan M59a Bh 12.0000 8,190.00
3 Paku M18 Kg 2.5000 17,070.00
4 Residu M49 Kg 0.3600 6,570.00
Jumlah Harga Bahan
C PERALATAN
1 Alat Bantu Ls 1.0000 2,000.00
Analisa
A. TENAGA
B. BAHAN
C. PERALATAN
AN
JUMLAH HARGA
(Rp.)
73,149.74
35,857.72
7,458.41
116,465.86
473,526.35
66,615.14
109,162.50
649,303.99
23,044.83
11,858.45
20,421.29
7,500.00
62,824.57
828,594.42
82,859.44
911,453.87
/atau ukuran
Analisa EI-718a
AN
JUMLAH HARGA
(Rp.)
73,149.74
35,857.72
7,458.41
116,465.86
439,703.04
61,856.92
113,459.26
615,019.22
23,044.83
12,553.01
20,421.29
7,500.00
63,519.14
795,004.22
79,500.42
874,504.64
/atau ukuran
termasuk PPN
Analisa EI-731
AN
JUMLAH HARGA
(Rp.)
1,457.14
714.29
742.86
2,914.29
11,957.00
361.40
12,318.40
50.00
50.00
15,282.69
1,528.27
16,810.95
/atau ukuran
termasuk PPN
Analisa EI-751
AN
JUMLAH HARGA
(Rp.)
97,142.86
28,571.43
29,714.29
155,428.57
187,315.20
40,950.00
788.40
229,053.60
2,000.00
2,000.00
386,482.17
38,648.22
425,130.39
Analisa EI-752
AN
JUMLAH HARGA
(Rp.)
136,000.00
40,000.00
41,600.00
217,600.00
2,861,760.00
98,280.00
42,675.00
2,365.20
3,005,080.20
2,000.00
2,000.00
3,224,680.20
322,468.02
3,547,148.22
ermasuk PPN
Analisa EI-79a
AN
107,368.42
52,631.58
27,368.42
187,368.42
208,611.00
234,889.60
59,495.39
502,995.99
5,000.00
5,000.00
695,364.41
69,536.44
764,900.85
/atau ukuran
termasuk PPN
ITEM PEMBAYARAN NO. : 10.8.(1)
JENIS PEKERJAAN : Pembersihan Semak/Perdu
SATUAN PEMBAYARAN : M2 URAIAN ANALISA HARGA SATUAN
I. ASUMSI
1 Menggunakan Tenaga Manusia (12 m x 1000 m/hari)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi Jalan : sedang / baik
4 Jam kerja efektif per-hari Tk 7.00 Jam
2. ALAT
2.a. ALAT BANTU
Diperlukan alat-alat bantu kecil
- Parang - Gerobak
- Keranjang +Sapu - Mesin Potong Rumput
- Kampak
3. TENAGA
Produksi yang dapat diselesaikan / hari Q1 8.00 M2/Jam
Produksi Rambahan / hari Qt 1,120.00 M2
Kebutuhan tenaga :
- Pekerja P 20.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 0.1250 Jam
- Mandor = (Tk x M) : Qt (L03) 0.0063 Jam
Rp. 3,814.64 / M2
I. ASUMSI
1 Hutan Sekunder/Tersier :
Pohon diameter < 10 cm a1 615.000 Tegakan
Pohon diameter 10 - 29 cm a2 395.000 Tegakan
Pohon diameter 30 - 59 cm b 135.000 Tegakan
Pohon diameter 60 - 89 cm c 15.000 Tegakan
Pohon di`meter 90 - 120 cm d 5.000 Tegakan
PE = a2 + (bx28.33) + (cx68.39) + (dx183.3) PE 6,161.900 Tegakan
2. ALAT
2.a. CHAIN SAW E39
a Menebang pohon diameter (a2)
a.1 Menebas pohon diameter (a2) 0.500 menit
-waktu tebas/pohon. 0.250 menit
-waktu pindah. ta21 0.350 menit
Kapasitas Produksi/jam (a2) = 60 Qa2.1 1.736 Ha
a2 x ta2.1
Koefisien alat untuk menebas E39(tb) = E39(a21) + E39(a22) E39(tb) 2.633 Jam
e Memotong (a2, b, c, d)
Waktu memotong
-diameter - 10 - 29 : tpa = ta2 x 1.25 tpa2 0.438 Menit
-diameter - 30 - 59 : tpb = tb x 1.35 tpb 4.388 Menit
-diameter - 60 - 89 : tpc = tc x 1.45 tpc 6.163 Menit
-diameter - 90 - 120 : tpd = td x 1.50 tpd 7.500 Menit
3. TENAGA
Tenaga pekerja untuk meneba (a1) dan merencek hasil tebas
tebang.
Produksi rencek Q1 1.000 Ha
Waktu rencekan (potong)
-diameter < 10 Cm tra1 0.250 Menit
-diameter - 10 - 29 Cm tra2 0.500 Menit
-diameter - 30 - 59 Cm trb 0.600 Menit
-diameter - 60 - 89 Cm trc 0.750 Menit
-diameter - 90 - 120 Cm trd 1.000 Menit
Kebutuhan tenaga :
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Koefisien tenaga / M2
- Pekerja = (Tk x P) : Qt (L01) 2.4214 Jam
- Mandor = (Tk x M) : Qt (L03) 0.2421 Jam
Rp. 2,721,286.13 / M2
I. ASUMSI
1 Hutan Sekunder/Tersier :
Pohon diameter < 10 cm a1 615.000 Tegakan
Pohon diameter 10 - 29 cm a2 395.000 Tegakan
Pohon diameter 30 - 59 cm b 115.000 Tegakan
Pohon diameter 60 - 89 cm c 15.000 Tegakan
Pohon di`meter 90 - 120 cm d 0.000 Tegakan
2. ALAT
2.a. BULLDOZER (Pengumpulan dengan secara mekanis) E04
Bulldozer yang dikombinasikan rake blade atau alat Qu 0.150 Ha
sejenis mengumpulkan pada lahan pekarangan seluas
1.500 M2
(50x30)
Jarak dorong Jd 25.000 meter
Lebar Kerja Efektif Lk 3.500 meter
Kecepatan Maju F1 5.000 km/Jam
Kecepatan Mundur R1 3.000 km/Jam
Faktor Koreksi Fk 0.900
Waktu Tetap Z 0.010 Jam
Jd x Lk x 1.25 x Fk
Kapasitas =
(Jd/F1 +Jd/R1 +Z) + 10,000 Q1 0.422 Ha/Jam
Koefisien alat per Ha (d) = Qu : Q1 E39(d) 0.356 Jam
3 Tenaga
a. Pilah
Produksi Pilah
- Pekerja P 2.000 Orang
- Mandor M 1.000 Orang
Koef. Tenaga
- Pekerja = (P x Tk) : Q1 L01 39.375 Jam
- Mandor = (M x Tk) : Q1 L04 19.688 Jam
c. Pembersihan
Produksi Pembersihan / Ha
- Pekerja L01 2.000 Orang
- Mandor L03 1.000 Orang
Koefisien Tenaga Pembersihan per HA
- Pekerja = (P x Tk) : Q1 L01 33.185 Jam
- Mandor = (M x Tk) : Q1 L03 16.593 Jam
Koefisien Tenaga
- Juru Ukur = (P x Tk) : Q1 L04 0.467 Jam
- Pembantu Juru Ukur = (P x Tk) : Q1 L01 0.933 Jam
Rp. 3,219,301.73 / M2
KETERANGAN
KEGIATAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi
PAKET PEKERJAAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi Pa
RUAS JALAN : Pembangunan Jalan Poros/Penghubung
PROP/KAB : Sumatera Barat/Sijunjung
ITEM PEMBAYARAN NO. : 10.8.(1)
JENIS PEKERJAAN : Pembersihan Semak/Perdu
SATUAN PEMBAYARAN : M2
PERKIRAAN
NO. KOMPONEN SATUAN
KUANTITAS
A TENAGA
1 Pekerja L01 Jam 0.1250
2 Mandor L03 Jam 0.0063
Perorang
Perkelompok
Jumlah Harga Bahan
Kelompok
C PERALATAN
1 Alat Bantu Ls 1.0000
Analisa EI-1091
KETERANGAN
KEGIATAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi
PAKET PEKERJAAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi Pa
RUAS JALAN : Pembangunan Jalan Poros/Penghubung
PROP/KAB : Sumatera Barat/Sijunjung
ITEM PEMBAYARAN NO. : 10.9.(1)
JENIS PEKERJAAN : Tebas, Tebang, Potong
SATUAN PEMBAYARAN : Ha
Tegakan
Pohon PERKIRAAN
Ekuivalen NO. KOMPONEN SATUAN
KUANTITAS
A TENAGA
1 Pekerja L01 Jam 2.4214
2 Mandor L03 Jam 0.2421
B BAHAN
C PERALATAN
1 Chain Saw (E39) Jam 59.2635
2 Alat Bantu Ls 1.0000
Analisa EI-1091
KETERANGAN
Analisa EI-1091
KETERANGAN
Lump Sump
Kelompok
Analisa EI-1091
NALISA HARGA SATUAN
KETERANGAN
Analisa EI-1092
KETERANGAN
KEGIATAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi
PAKET PEKERJAAN : Pembangunan Permukiman Dan Infrastruktur Kawasan Transmigrasi Pa
RUAS JALAN : Pembangunan Jalan Poros/Penghubung
PROP/KAB : Sumatera Barat/Sijunjung
ITEM PEMBAYARAN NO. : 10.9.(2)
JENIS PEKERJAAN : Pilah,Kumpul, Bersih
SATUAN PEMBAYARAN : Ha
PERKIRAAN
NO. KOMPONEN SATUAN
KUANTITAS
A TENAGA
1 Pekerja L01 Jam 156.6673
2 Mandor L03 Jam 44.6908
3 Juru Ukur L04 Jam 0.4667
4 Pembantu Juru Ukur L01 Jam 0.9333
B BAHAN
C PERALATAN
1 Buldozer (E39) Jam 0.3556
2 Alat Ukur (E40+E41) Jam 0.1000
3 Alat Bantu Ls 1.0000
Analisa EI-1092
KETERANGAN
Lump Sump
Analisa EI-1092
KETERANGAN
Analisa EI-1092
DAR UNTUK
G-MASING HARGA SATUAN
12,142.86 1,517.86
18,571.43 116.07
1,633.93
0.00
100.00 100.00
ga Peralatan 100.00
TAN ( A + B + C ) 1,733.93
173.39
3,814.64
a Kerja dan Peralatan, volume dan/atau ukuran
Analisa EI-1091
DAR UNTUK
G-MASING HARGA SATUAN
12,142.86 29,403.29
18,571.43 4,496.97
33,900.26
0.00
45,278.86 2,683,385.87
4,000.00 4,000.00
ga Peralatan 2,687,385.87
TAN ( A + B + C ) 2,721,286.13
0.00
2,721,286.13
a Kerja dan Peralatan, volume dan/atau ukuran
DAR UNTUK
G-MASING HARGA SATUAN
12,142.86 1,902,388.16
18,571.43 829,972.00
19,285.71 9,000.00
15,714.29 14,666.67
2,741,360.16
0.00
497,187.51 176,777.78
25,000.00 2,500.00
6,000.00 6,000.00
ga Peralatan 185,277.78
TAN ( A + B + C ) 2,926,637.94
292,663.79
3,219,301.73
a Kerja dan Peralatan, volume dan/atau ukuran
HARGA
BAHAN
NO. URAIAN SATUAN (Rp.)
Rp.
6,800.00
62,500.00
1,300.00
17,000.00
87,600.00 708,640.00
70,864.00
779,504.00
77,950.40
1,700.00
15,625.00
1,625.00
17,000.00
35,950.00 52,598.95
5,259.90
57,858.85
1,360.00
12,500.00
650.00
8,500.00
23,010.00 36,764.80
3,676.48
40,441.28
140,000.00
67,500.00
207,500.00 677,084.07
67,708.41
744,792.47
68,000.00
125,000.00
32,500.00
510,000.00
735,500.00 1,092,480.00
109,248.00
1,201,728.00
801,152.00
27,200.00
250,000.00
26,000.00
85,000.00
388,200.00 567,043.60
56,704.36
623,747.96
62,374.80
27,200.00
250,000.00
26,000.00
85,000.00
388,200.00 456,506.00
45,650.60
502,156.60
50,215.66
27,200.00
250,000.00
26,000.00
303,200.00 338,817.30
33,881.73
372,699.03
37,269.90
1,360.00
12,500.00
650.00
8,500.00
23,010.00 69,945.00
6,994.50
76,939.50