KEBUTUHAN BAHAN
A BAHAN
1 Semen sak 27.00
2 Pasir Cor rit 0.65
3 Batu Pecah 2-3'' rit 0.91
4 Besi 12 btg 37.00
5 Besi 10 btg 16.00
6 Kawat Bendrat kg 7.95
7 Papan Bekisting m3 0.42
8 Multiplex 9 mm lbr 4.20
9 Balok 5/10 btg 52.80
10 Paku 5 – 10 cm kg 10.56
1300
0.1304
Rp 40,000.00 0.2304
Rp 100,000.00 28.8
Rp 6,400.00 5.76
Rp 49,500.00 4.752
Rp 195,900.00
12
Rp 40,000.00 0.192
Rp 52,500.00 4.2
Rp 100,000.00 24
Rp 6,400.00 4.8
Rp 49,500.00 3.96
Rp 248,400.00
13.577
1.939571
Pekerjaan P L T V
Sloof 18 0.2 0.3 1.08
Kolom 0.2 0.2 3 0.72
Ringbalok 18 0.2 0.3 1.08
Tulangan Sengkang
Pembesian Utama /Begel
Sloof
- Panjang 108.00 90.00
- Btg 9.00 5.4 90
- Berat 96.3 25.38 7.5
Kolom
- Panjang 108 15
- Btg 9.00 12
1
96.3 7.4
Plat Lantai
Kebutuhan Besi Penutup Drainase
Arah X 10.00 bh
Arah Y 30.00 bh
(P x X) 60.00 m
(L x Y) 60.00 m
Jmlh Besi 120.00 m
Jmlh Batang 10.00 btg
Jmlh Berat 74.00 kg
Bekisting
Sloof 0.8 14.4
0.02 7.2
0.016
62.5
Kolom 0.8
2.4
14.4