62.74 222.04
1.60
PLESTERAN
130.96
148.98
59.06
54.4
105.56
103.96
14.64
8.08
625.64
Time Schedule
PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017
JANGKA WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER
100
I. PEKERJAAN PERSIAPAN 3.94 1.31 1.31 1.31
90
II. PEKERJAAN TANAH DAN PASIR 3.97 0.99 0.99 0.99 0.99
80
III. PEKERJAAN PASANGAN, PLESTERAN DAN BET 47.75 6.82 6.82 6.82 6.82 6.82 6.82 6.82
70
IV. PEKERJAAN KAYU 18.81 3.13 3.13 3.13 3.13 3.13 3.13
60
V. PEKERJAAN ATAP DAN PLAFOND 13.33 2.67 2.67 2.67 2.67 2.67 50
VI. PEKERJAAN PENGECATAN 4.05 1.01 1.01 1.01 1.01 40
VII. PEKERJAAN ALAT GANTUNG DAN PENGUNCI 1.64 0.82 0.82 30
VIII. PEKERJAAN INSTALASI LISTRIK 3.28 1.09 1.09 1.09 20
RENCANA PRESTASI MINGGUAN 100.00 1.31 2.31 2.31 7.81 7.81 6.82 9.96 11.03 11.03 12.62 6.90 6.90 4.77 4.75 1.83 1.83
RENCANA PRESTASI KOMULATIF 1.31 3.62 5.93 13.74 21.56 28.38 38.34 49.37 60.40 73.02 79.92 86.81 91.58 96.34 98.17 100.00
REALISASI MINGGUAN
REALISASI KOMULATIF
Rekapitulasi
JUMLAH 913,877,493.29
DIBULATKAN 913,877,000.00
TERBILANG :
SEMBILAN RATUS TIGA BELAS JUTA DELAPAN RATUS TUJUH PULUH TUJUH RIBU RUPIAH
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
I. PEKERJAAN PERSIAPAN
1 Pembongkaran bangunan lama dan Pembersihan Lokasi. 1.00 Ls 8,960,000.00 8,960,000.00
2 Foto Dokumentasi ( 0 % - 100 %) 3.00 Set 300,000.00 900,000.00
3 Pembuatan Papan Nama Proyek. 1.00 Ls 550,000.00 550,000.00
4 Pengukuran & Pemasangan Bowplank 90.00 M' 98,340.00 8,850,600.00
5 Pembuatan Gudang Bahan 1.00 Ls 6,000,000.00 6,000,000.00
6 Air Kerja Lapangan 1.00 Ls 1,500,000.00 1,500,000.00
7 Mobilisasi dan Demobilisasi Alat 1.00 Ls 6,000,000.00 6,000,000.00
Sub Total ( I ) 32,760,600.00
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi. 60.72 M3 90,200.00 5,476,944.00
2 Pek. Urugan Tanah Kembali. 20.24 M3 64,900.00 1,313,576.00
3 Pek. Memadatkan Tanah 54.79 M3 29,506.67 1,616,729.28
4 Pek. Urugan Pasir Bawah Pondasi. 5.52 M3 346,280.00 1,911,465.60
5 Pek. Urugan Pasir Bawah Lt. Ruang,Teras dan Rabat 15.57 M3 346,280.00 5,389,848.20
6 Pek. Urugan Tanah Peninggian Peil Lantai Ruang,Teras 54.79 M3 315,700.00 17,297,834.40
Dan Rabat.
Sub Total ( II ) 33,006,397.48
III. PEKERJAAN PASANGAN, PLESTERAN DAN BETON
1 Pasangan Batu Kosong. 14.49 M3 675,092.00 9,782,083.08
2 Pondasi Batu Kali, Camp. 1 : 4 41.06 M3 1,133,550.00 46,537,895.25
3 Cor Sloof Beton Bertlg 15/20 cm,Camp. 1 : 2 : 3 , 4.14 M3 6,858,243.84 28,393,129.48
4 Cor Kolom Beton Bertlg 12/12 cm,Camp. 1 : 2 : 3 , 2.12 M3 9,819,879.07 20,786,720.01
5 Cor Kolom Beton Bertlg 20/20 cm,Camp. 1 : 2 : 3 , 0.56 M3 10,977,995.74 6,147,677.61
6 Cor Ringbalk Beton Bertlg 12/15 cm,Camp. 1 : 2 : 3 , 2.48 M3 9,016,932.24 22,398,059.67
7 Cor Ringbalk Beton Bertlg 12/25 cm,Camp. 1 : 2 : 3 , 0.87 M3 9,016,932.24 7,844,731.04
8 Cor Balok Teras 12/20 cm, Camp. 1 : 2 : 3 , 0.36 M3 9,016,932.24 3,246,095.60
9 Cor plat Meja beton Camp. 1 : 2 : 3 , 0.14 M3 5,646,844.91 815,263.23
10 Pasang pondasi rabat Batu Tela 1/2 Batu Camp. 1 : 2, 45.00 M2 172,851.25 7,778,306.25
11 Pasang Batu Tela 1/4 Batu Camp. 1 : 2, 36.73 M2 172,851.25 6,349,172.12
12 Pasang Batu Tela 1/4 Batu Camp. 1 : 4, 352.59 M2 158,983.00 56,055,498.00
13 Plesteran Dinding Camp. 1 : 2 105.34 M2 82,900.84 8,732,774.49
14 Plesteran Dinding Camp. 1 : 4 583.96 M2 75,827.40 44,280,168.50
15 Cor Ruang dan Teras , Camp. 1 : 3 : 5 13.92 M3 1,443,487.69 20,093,348.68
16 Cor Rabat diplester dan Diaci 100.00 M2 192,565.53 19,256,553.46
17 Pasang Keramik Lantai Kamar dan Teras 40 x 40 cm 214.79 M2 322,138.30 69,192,729.73
18 Pasang Batu Gurat pada kolom teras 3.52 M2 354,447.50 1,247,655.20
19 Pasang Keramik 20 x 20 Lantai Km/Wc 6.36 M2 324,773.90 2,065,562.00
20 Pasang Keramik 20 x 25 Dinding Km/Wc 28.20 M2 338,957.30 9,558,595.86
21 Pasang Keramik 20 x 25 Meja beton 5.88 M2 338,957.30 1,992,052.05
22 Pasang Bak Air KM/WC lapis keramik 4.00 Unit 1,033,421.38 4,133,685.53
Sub Total ( III ) 396,687,756.87
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
IV. PEKERJAAN KAYU
1 Pek. Kusen Kayu Besi 5/10 1.60 M3 10,142,000.00 16,213,893.70
2 Pek. Kuda - kuda + Bubungan kayu Besi 5/10 4.14 M3 8,884,700.00 36,791,542.70
3 Pek. Gording Kayu Matoa 5/10 2.75 M3 6,281,000.00 17,290,336.80
4 Pek. Pintu Panil Papan Kayu Besi 27.51 M2 785,125.00 21,598,788.75
5 Pek. Pasang Listplank Kayu Besi 2/25 Cm 90.00 M' 108,267.50 9,744,075.00
6 Pek. Pasang Rangka Plafond Kayu Matoa 291.88 M2 131,252.00 38,309,833.76
7 Pek. Pasang Jalusi Kayu Besi 2/10 Cm. 1.26 M2 605,440.00 762,854.40
8 Pasang Jendela Panel Kaca 22.10 M2 702,968.75 15,535,609.38
JUMLAH 830,797,721.17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017
HARGA SATUAN
NO URAIAN KODE SATUAN
( Rp. )
1 2 3 4 5
I UPAH KERJA
1 Pekerja L.01 OH 105,000.00
2 Tukang Kayu L.02 OH 110,000.00
3 Tukang Batu L.02 OH 110,000.00
4 Tukang Besi L.02 OH 110,000.00
5 Tukang Cat L.02 OH 110,000.00
6 Tukang Las L.02 OH 110,000.00
7 Tukang Listrik L.02 OH 110,000.00
8 Kepala Tukang L.03 OH 120,000.00
9 Mandor L.04 OH 130,000.00
10 Stamper Jam 40,000.00
II BAHAN BANGUNAN
1 Batu Kali M3 290,000.00
2 Batu Tela/Batako Bh 2,500.00
3 Batu Terawang Uk. ( 20 x 20 ) cm Bh 5,000.00
4 Batu Alam Garis M2 248,000.00
5 Pasir Beton M3 273,000.00
6 Pasir Beton Kg 210.00
7 Pasir Pasang M3 235,000.00
8 Pasir Urug M3 235,000.00
9 Pasir Plester M3 235,000.00
10 Tanah Timbunan Biasa M3 180,000.00
11 Kerikil Cor M3 365,000.00
12 Kerikil Cor Kg 280.77
13 Kerikil Pecah/Cipping M3 489,000.00
14 Kerikil Pecah/Cipping Kg 376.15
15 Papan Kayu Besi M3 5,625,000.00
16 Balok Kayu Besi M3 5,300,000.00
17 Balok Kayu Matoa M3 3,400,000.00
18 Papan Kayu Matoa M3 3,550,000.00
19 Balok Kayu Putih M3 2,500,000.00
20 Papan Kayu Putih/Papan Begisting M3 2,500,000.00
21 Kayu Dolken / 4 m Batang 30,000.00
22 Besi Beton Ulir/Polos Kg 17,500.00
23 Kawat Ikat / Beton Kg 22,500.00
24 Paku Campuran Kg 20,000.00
25 Paku Zinc Galvalum ( Spandek ) Kg 80,000.00
26 Paku Tripleks Kg 30,000.00
27 Semen PC @ 50 Kg Kg 1,850.00
28 Minyak Bekisting Liter 23,000.00
29 Semen Warna (untuk Nat Keramik) Kg 15,700.00
30 Keramik Uk. ( 60 x 60 ) Bh 48,000.00
31 Keramik Lantai Uk. (40 x 40) cm Bh 18,500.00
32 Keramik Lantai Tekstur Kasar (40 x 40) cm Bh 20,000.00
33 Keramik Dinding (20 x 25) cm Bh 5,500.00
34 Keramik Lantai Anti Slip (20 x 20) cm Bh 4,500.00
35 Plint Keramik Uk. ( 10 x 60 ) cm Bh 12,000.00
36 Plin Keramik Artistik (5 x20 ) cm Bh 7,500.00
37 Batu Alam Bh 12,000.00
38 Lem Kayu Kg 22,500.00
39 Kaca Riben 5 mm M2 223,750.00
40 Tripleks 4 mm Lmbr 85,000.00
41 List Kayu Diprofil M' 9,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN
( Rp. )
1 2 3 4 5
1 2 3 4 5 6 7 8
SATUDUA TIGA EMPALIMA ENAMTUJU DELA
SEBEDUA TIGA EMPALIMA ENAMTUJUHDELA
877 DELATUJU TUJU 000 SEMBISEMBIDELAP
DELAP
0
9 0
SEMBILAN 0
SEMBILAN BELAS