DAFTAR ANALISA PEKERJAAN


0: 0
Paket : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
Lokasi : JL. SPMA REREMI - KABUPATEN MANOKWARI
Tahun : 2017

Pek. Pengukuran & Pemasangan Bowplank / M'


Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Kaso matoa m3 0.012 3,400,000.00 0.00 40,800.00 0.00
Paku Biasa / campur kg 0.020 20,000.00 0.00 400.00 0.00
Bahan Kayu Papan matoa m3 0.007 3,550,000.00 0.00 24,850.00 0.00
Tukang kayu oh 0.100 0.00 Err:509 0.00 Err:509
Pekerja oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
66,050.00 Err:509
Err:509
Galian Tanah Biasa sedalam 1 m' / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja oh 0.750 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.025 0.00 Err:509 0.00 Err:509
0.00 Err:509
Err:509
Urugan Tanah Kembali / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Pekerja oh 0.250 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.008 0.00 Err:509 0.00 Err:509
0.00 Err:509
Err:509
Urugan Tanah dipadatkan / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tanah urug m3 1.200 180,000.00 0.00 216,000.00 0.00
Bahan Stamper jam 0.300 Err:509 0.00 Err:509 0.00
Pekerja oh 0.500 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.050 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Urugan Pasir / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pasir urug m3 1.200 235,000.00 0.00 282,000.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
282,000.00 Err:509
Err:509
Pasang Pondasi Batu Kosong (Aanstamping) / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu Gunung m3 1.200 290,000.00 0.00 348,000.00 0.00
Bahan Pasir urug m3 0.432 235,000.00 0.00 101,520.00 0.00
Pekerja oh 0.780 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.390 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.039 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.039 0.00 Err:509 0.00 Err:509
449,520.00 Err:509
Err:509
Pasang Pondasi Batu Gunung camp. 1 : 4 / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu Gunung m3 1.200 290,000.00 0.00 348,000.00 0.00
Portland Cement kg 163.000 1,850.00 0.00 301,550.00 0.00
Bahan Pasir Pasang m3 0.520 235,000.00 0.00 122,200.00 0.00
Pekerja oh 1.500 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.750 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.075 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.075 0.00 Err:509 0.00 Err:509
771,750.00 Err:509
Err:509
Memasang Dinding Bata tebal 3/4 bata, camp. 1 : 4 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu bata bh 81.000 2,500.00 0.00 202,500.00 0.00
Portland Cement kg 27.300 1,850.00 0.00 50,505.00 0.00
Bahan Pasir Pasang m3 0.120 235,000.00 0.00 28,200.00 0.00
Pekerja oh 0.400 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.200 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.020 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
281,205.00 Err:509
Err:509
Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 4 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu bata bh 27.000 2,500.00 0.00 67,500.00 0.00
Portland Cement kg 11.500 1,850.00 0.00 21,275.00 0.00
Bahan Pasir Pasang m3 0.043 235,000.00 0.00 10,105.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
98,880.00 Err:509
Err:509
Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 3 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu bata bh 27.000 2,500.00 0.00 67,500.00 0.00
Portland Cement kg 14.370 1,850.00 0.00 26,584.50 0.00
Bahan Pasir Pasang m3 0.040 235,000.00 0.00 9,400.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
103,484.50 Err:509
Err:509
Memasang Dinding Bata tebal 1/2 bata, camp. 1 : 2 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu bata bh 54.000 2,500.00 0.00 135,000.00 0.00
Portland Cement kg 43.600 1,850.00 0.00 80,660.00 0.00
Bahan Pasir Pasang m3 0.080 235,000.00 0.00 18,800.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
234,460.00 Err:509
Err:509
Memasang Dinding Bata tebal 1/4 bata, camp. 1 : 2 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu bata bh 27.000 2,500.00 0.00 67,500.00 0.00
Portland Cement kg 18.950 1,850.00 0.00 35,057.50 0.00
Bahan Pasir Pasang m3 0.038 235,000.00 0.00 8,930.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
111,487.50 Err:509
Err:509
Memasang Batu Alam Tekstur Halus/ M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Batu Alam Tekstur Halus Uk.( 10 x 20 ) cm bh 50.000 Err:509 0.00 Err:509 0.00
Portland Cement kg 1.290 1,850.00 0.00 2,386.50 0.00
Bahan Pasir Pasang m3 0.042 235,000.00 0.00 9,870.00 0.00
Pekerja oh 0.062 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.035 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.004 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Plesteran 1 : 4 , tebal 15 mm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 6.240 1,850.00 0.00 11,544.00 0.00
Bahan Pasir Pasang m3 0.024 235,000.00 0.00 5,640.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.150 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.015 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
17,184.00 Err:509
Err:509
Plesteran 1 : 3 , tebal 15 mm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 7.776 1,850.00 0.00 14,385.60 0.00
Bahan Pasir Pasang m3 0.023 235,000.00 0.00 5,405.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.150 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.015 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
19,790.60 Err:509
Err:509
Plesteran 1 : 2 , tebal 15 mm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 10.224 1,850.00 0.00 18,914.40 0.00
Bahan Pasir Pasang m3 0.020 235,000.00 0.00 4,700.00 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.150 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.015 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
23,614.40 Err:509
Err:509
Pekerjaan Acian / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 3.250 1,850.00 0.00 6,012.50 0.00
Pekerja oh 0.200 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
6,012.50 Err:509
Err:509
Tali Air/Benangan Sudut / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Portland Cement kg 1.000 1,850.00 0.00 1,850.00 0.00
Tukang batu oh 0.400 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.020 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
1,850.00 Err:509
Err:509
Membuat Beton 1 : 3 : 5 (K - 175) / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 326.000 1,850.00 0.00 603,100.00 0.00
Pasir beton ( kg ) kg 760.000 210.00 0.00 159,600.00 0.00
Kerikil beton kg kg 1,029.000 280.77 0.00 288,911.54 0.00
Bahan Air liter 215.000 200.00 0.00 43,000.00 0.00
Pekerja oh 1.650 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.275 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.028 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.083 0.00 Err:509 0.00 Err:509
1,094,611.54 Err:509
Err:509
Membuat Beton 1 : 2 : 3 (K - 200) / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 352.000 1,850.00 0.00 651,200.00 0.00
Pasir beton ( kg ) kg 731.000 210.00 0.00 153,510.00 0.00
Kerikil Pecah/Cipping (kg) kg 1,031.000 376.15 0.00 387,814.62 0.00
Bahan Air liter 215.000 200.00 0.00 43,000.00 0.00
Pekerja oh 1.650 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.275 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.028 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.083 0.00 Err:509 0.00 Err:509
1,235,524.62 Err:509
Err:509
Pembesian dengan Besi Polos atau Besi Ulir / 10 Kg
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Besi beton (polos/ulir) kg 10.500 17,500.00 183,750.00 0.00
Bahan Kawat beton kg 0.150 22,500.00 3,375.00 0.00
Pekerja oh 0.070 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.070 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.007 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.004 0.00 Err:509 0.00 Err:509
187,125.00 Err:509
Untuk 10 kg Err:509
Untuk 1 kg Err:509
Memasang Bekisting Fondasi dan Sloof / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu Matoa m3 0.015 3,400,000.00 51,000.00 0.00
Papan Bekisting m3 0.040 2,500,000.00 100,000.00 0.00
Bahan Paku campur kg 0.400 20,000.00 8,000.00 0.00
Pekerja oh 0.660 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.330 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.033 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.033 0.00 Err:509 0.00 Err:509
159,000.00 Err:509
Err:509
Memasang Bekisting Kolom / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan bekesting m3 0.035 2,500,000.00 0.00 87,500.00 0.00
Kayu Matoa 5/5 cm m3 0.015 3,400,000.00 0.00 51,000.00 0.00
Paku campur kg 0.400 20,000.00 0.00 8,000.00 0.00
Bahan Dolken kayu skoor btg 2.000 30,000.00 0.00 60,000.00 0.00
Pekerja oh 0.600 0.00 Err:509 0.00 Err:509
Tukang Kayu oh 0.300 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.030 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.030 0.00 Err:509 0.00 Err:509
206,500.00 Err:509
Err:509
Memasang Bekisting Balok / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan bekesting m3 0.035 2,500,000.00 0.00 87,500.00 0.00
Paku campur kg 0.400 20,000.00 0.00 8,000.00 0.00
Balok kayu kelas II m3 0.020 3,400,000.00 0.00 68,000.00 0.00
Bahan Dolken kayu skoor btg 2.000 30,000.00 0.00 60,000.00 0.00
Pekerja oh 0.600 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.330 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.033 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.030 0.00 Err:509 0.00 Err:509
223,500.00 Err:509
Err:509
Memasang Bekisting Plate Meja Beton / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu bekesting m3 0.035 2,500,000.00 0.00 87,500.00 0.00
Paku campur kg 0.400 20,000.00 0.00 8,000.00 0.00
Balok kayu kelas II m3 0.015 3,400,000.00 0.00 51,000.00 0.00
Bahan Dolken kayu skoor btg 0.500 30,000.00 0.00 15,000.00 0.00
Pekerja oh 0.600 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.330 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.033 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.033 0.00 Err:509 0.00 Err:509
161,500.00 Err:509
Err:509
Memasang Bekisting Plate Kanopi tinggi 2-3 M / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu bekesting m3 0.035 2,500,000.00 0.00 87,500.00 0.00
Paku campur kg 0.400 20,000.00 0.00 8,000.00 0.00
Balok kayu kelas II m3 0.015 3,400,000.00 0.00 51,000.00 0.00
Bahan Dolken kayu skoor btg 2.000 30,000.00 0.00 60,000.00 0.00
Pekerja oh 0.600 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.330 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.033 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.033 0.00 Err:509 0.00 Err:509
206,500.00 Err:509
Err:509
Memasang Bekisting Plate Tinggi 4 M / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu bekesting m3 0.035 2,500,000.00 0.00 87,500.00 0.00
Paku campur kg 0.400 20,000.00 0.00 8,000.00 0.00
Balok kayu kelas II m3 0.015 3,400,000.00 0.00 51,000.00 0.00
Bahan Dolken kayu skoor btg 3.200 30,000.00 0.00 96,000.00 0.00
Pekerja oh 0.600 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.330 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.033 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.033 0.00 Err:509 0.00 Err:509
242,500.00 Err:509
Err:509
Kolom Praktis Beton Bertulang / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kayu bekesting m3 0.003 2,500,000.00 0.00 7,500.00 0.00
Paku campur kg 0.020 20,000.00 0.00 400.00 0.00
Besi beton polos kg 3.000 Err:509 0.00 Err:509 0.00
Kawat beton kg 0.450 22,500.00 0.00 10,125.00 0.00
Portland Cement kg 4.000 1,850.00 0.00 7,400.00 0.00
Pasir beton m3 0.006 Err:509 0.00 Err:509 0.00
Bahan Koral Beton m3 0.009 365,000.00 0.00 3,285.00 0.00
Pekerja oh 0.180 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.020 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.020 0.00 Err:509 0.00 Err:509
Tukang besi oh 0.020 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.009 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Cor Lantai Rabat 1 : 3 : 5 ( K-175 ) Tebal 8 cm, diplester dan aci halus / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Portland Cement kg 26.080 1,850.00 0.00 48,248.00 0.00
Pasir beton ( kg ) kg 60.800 210.00 0.00 12,768.00 0.00
Koral beton kg kg 82.320 280.77 0.00 23,112.92 0.00
Acian m2 1.000 Err:509 0.00 Err:509 0.00
Bahan Air liter 215.000 200.00 0.00 43,000.00 0.00
Pekerja oh 1.650 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.275 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.028 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.083 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Konstruksi Gording Kayu Besi / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu besi m3 1.100 5,300,000.00 0.00 5,830,000.00 0.00
Besi strip tebal 5 mm kg 15.000 Err:509 0.00 Err:509 0.00
Bahan Paku campur kg 3.000 18,000.00 0.00 54,000.00 0.00
Pekerja oh 2.200 0.00 Err:509 0.00 Err:509
Tukang kayu oh 7.400 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.740 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.120 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Konstruksi Kuda-kuda Kayu Besi / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu besi m3 1.100 5,300,000.00 0.00 5,830,000.00 0.00
Besi strip tebal 5 mm kg 15.000 Err:509 0.00 Err:509 0.00
Bahan Paku campur kg 5.800 18,000.00 0.00 104,400.00 0.00
Pekerja oh 4.600 0.00 Err:509 0.00 Err:509
Tukang kayu oh 14.000 0.00 Err:509 0.00 Err:509
Kepala tukang oh 1.400 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.200 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Kaso + Reng Kayu Besi / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu besi m3 0.010 5,300,000.00 0.00 53,000.00 0.00
Bahan Paku campur kg 0.250 20,000.00 0.00 5,000.00 0.00
Pekerja oh 0.280 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.028 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.200 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
58,000.00 Err:509
Err:509
Membuat dan Pasang Kusen Pintu dan Jendela Kayu Besi / M3
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Balok kayu besi m3 1.100 5,300,000.00 0.00 5,830,000.00 0.00
Paku campur kg 1.250 20,000.00 0.00 25,000.00 0.00
Bahan Lem kayu kg 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 7.000 0.00 Err:509 0.00 Err:509
Tukang kayu oh 21.000 0.00 Err:509 0.00 Err:509
Kepala tukang oh 2.100 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.350 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Rangka Plafond Kayu Matoa / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kaso-kaso kayu matoa m3 0.015 3,400,000.00 0.00 52,360.00 0.00
Bahan Paku campur kg 0.200 20,000.00 0.00 4,000.00 0.00
Pekerja oh 0.150 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.300 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.030 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.075 0.00 Err:509 0.00 Err:509
56,360.00 Err:509
Err:509
Pasang Daun Pintu Panel Kayu Besi / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu besi m3 0.040 5,625,000.00 0.00 225,000.00 0.00
Bahan Lem kayu kg 0.500 Err:509 0.00 Err:509 0.00
Pekerja oh 1.000 0.00 Err:509 0.00 Err:509
Tukang kayu oh 3.000 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.300 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.050 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Listplank Kayu Besi / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Papan kayu besi m3 0.011 3,845,000.00 0.00 42,295.00 0.00
Bahan Paku campur kg 0.050 18,000.00 0.00 900.00 0.00
Pekerja oh 0.100 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.200 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.020 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
43,195.00 Err:509
Err:509
Pasang Kaca mati (Buram) 5 mm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kaca Buram 5 mm m2 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.500 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.050 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Atap Metal motif Genteng 0,3 / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Atap Metal 0,3 m2 1.020 Err:509 0.00 Err:509 0.00
Bahan Paku anti karat kg 0.200 80,000.00 0.00 16,000.00 0.00
Pekerja oh 0.200 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Nok Metal 0,3 / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Nok Metal 0,3 m' 1.100 Err:509 0.00 Err:509 0.00
Bahan Paku anti karat kg 0.050 80,000.00 0.00 4,000.00 0.00
Pekerja oh 0.250 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.150 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.015 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.013 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Kunci Tanam 2 Slaag / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Tanam Pintu bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.060 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.600 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.060 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Kunci Tanam 1 Slaag (KM/WC) / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kunci Tanam KM/WC bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.005 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.500 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.005 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Engsel Pintu / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Engsel Pintu bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.015 0.00 Err:509 0.00 Err:509
Tukang kayu oh 0.150 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.015 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Lantai Keramik Anti Slip uk. (40 x 40) cm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Anti Slip 40/40 bh 6.630 Err:509 0.00 Err:509 0.00
Portland Cement kg 9.980 1,850.00 0.00 18,463.00 0.00
Pasir Pasang m3 0.045 235,000.00 0.00 10,575.00 0.00
Bahan Semen warna kg 1.300 Err:509 0.00 Err:509 0.00
Pekerja oh 0.700 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.350 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.035 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.035 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Plint Keramik uk. (10 x 40) cm / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik 10/40 bh 2.650 Err:509 0.00 Err:509 0.00
Portland Cement kg 1.140 1,850.00 0.00 2,109.00 0.00
Pasir Pasang m3 0.003 235,000.00 0.00 705.00 0.00
Bahan Semen warna kg 0.100 Err:509 0.00 Err:509 0.00
Pekerja oh 0.100 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Plint Keramik Artistik uk. ( 5 x 20) cm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik Artistik Uk. 5/20 bh 106.000 Err:509 0.00 Err:509 0.00
Portland Cement kg 8.190 1,850.00 0.00 15,151.50 0.00
Pasir Pasang m3 0.045 235,000.00 0.00 10,575.00 0.00
Bahan Semen warna kg 3.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.700 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.350 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.035 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.035 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Lantai Keramik anti Slip uk. (20 x 20) cm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik 20/20 bh 26.500 Err:509 0.00 Err:509 0.00
Portland Cement kg 10.400 1,850.00 0.00 19,240.00 0.00
Pasir Pasang m3 0.045 235,000.00 0.00 10,575.00 0.00
Bahan Semen warna kg 1.620 Err:509 0.00 Err:509 0.00
Pekerja oh 0.700 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.350 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.035 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.035 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Dinding Keramik KM/WC + Bak Air uk. (20 x 25) cm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Keramik 20/25 bh 21.500 Err:509 0.00 Err:509 0.00
Portland Cement kg 9.300 1,850.00 0.00 17,205.00 0.00
Pasir Pasang m3 0.018 235,000.00 0.00 4,230.00 0.00
Bahan Semen warna kg 1.940 Err:509 0.00 Err:509 0.00
Pekerja oh 0.800 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.400 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.040 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.040 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Plafond Tripleks 4 mm / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Tripleks 4 mm lmbr 0.375 Err:509 0.00 Err:509 0.00
Bahan Paku tripleks kg 0.030 30,000.00 0.00 900.00 0.00
Pekerja oh 0.100 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang List Plafond Kayu / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
List kayu m' 1.050 Err:509 0.00 Err:509 0.00
Bahan Paku campur kg 0.010 20,000.00 0.00 200.00 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.050 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.005 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan Kilap Kayu (3 x laburan) / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni kg 0.200 Err:509 0.00 Err:509 0.00
Plamir kg 0.150 Err:509 0.00 Err:509 0.00
Cat Dasar kg 0.170 Err:509 0.00 Err:509 0.00
Bahan Cat Kayu kg 0.260 Err:509 0.00 Err:509 0.00
Pekerja oh 0.070 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.009 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan Tembok Baru (3 x laburan) / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir kg 0.100 Err:509 0.00 Err:509 0.00
Cat Dasar kg 0.100 Err:509 0.00 Err:509 0.00
Bahan Cat Tembok kg 0.260 Err:509 0.00 Err:509 0.00
Pekerja oh 0.020 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.063 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan Plafon Baru dgn Cat Tembok (3 x laburan) / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Plamir kg 0.120 Err:509 0.00 Err:509 0.00
Cat Dasar kg 0.120 Err:509 0.00 Err:509 0.00
Bahan Cat Tembok kg 0.340 Err:509 0.00 Err:509 0.00
Pekerja oh 0.020 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.072 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan Meni / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Cat Meni kg 0.120 Err:509 0.00 Err:509 0.00
Amplas lmbr 0.273 Err:509 0.00 Err:509 0.00
Bahan Minyak Cat ltr 0.028 Err:509 0.00 Err:509 0.00
Pekerja oh 0.025 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.052 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.007 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.010 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan dengan Politur/ M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Politur ltr 0.360 55,700.00 0.00 20,052.00 0.00
Pekerja oh 0.040 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.063 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.063 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
20,052.00 Err:509
Err:509
Pengecatan dengan Teak Oil / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Teak Oil ltr 0.360 Err:509 0.00 Err:509 0.00
Pekerja oh 0.040 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.063 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.063 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pengecatan Plat Beton dengan Aqualastic (3 x laburan) / M2
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Cat Waterproofing beton (Aqualastic) kg 0.420 Err:509 0.00 Err:509 0.00
Pekerja oh 0.020 0.00 Err:509 0.00 Err:509
Tukang cat oh 0.063 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Lampu Philips XL 18 Watt / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Lampu XL 18 Watt bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang listrik oh 0.080 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.008 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Lampu Philips XL 23 Watt / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Lampu XL 23 Watt bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang listrik oh 0.080 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.008 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Saklar Tunggal 200 Watt / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Saklar Tunggal bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang listrik oh 0.080 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.008 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Saklar Ganda 200 Watt / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Saklar Ganda bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.050 0.00 Err:509 0.00 Err:509
Tukang listrik oh 0.080 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.008 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.001 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Titik Nyala Lampu Penerangan / Titik
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Kabel NYM 1 x 1,5 mm dan Assesories mtr 8.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.300 0.00 Err:509 0.00 Err:509
Tukang listrik oh 0.300 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.030 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.015 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Urinoir / Unit
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Urinoer bh 1.000 Err:509 0.00 Err:509 0.00
Perlengkapan Err:509 0.00
Semen Portland kg 6.000 1,850.00 0.00 11,100.00 0.00
Bahan Pasir Pasang m3 0.010 235,000.00 0.00 2,350.00 0.00
Pekerja oh 1.000 0.00 Err:509 0.00 Err:509
Tukang batu oh 1.000 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.150 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.100 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Klosed Duduk + Jetwasher / Unit
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Klosed Duduk + Jetwasher bh 1.000 Err:509 0.00 Err:509 0.00
Batu Tela bh 7.000 2,500.00 0.00 17,500.00 0.00
Semen Portland kg 6.000 1,850.00 0.00 11,100.00 0.00
Bahan Pasir Pasang m3 0.010 235,000.00 0.00 2,350.00 0.00
Pekerja oh 1.000 0.00 Err:509 0.00 Err:509
Tukang batu oh 1.500 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.300 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.110 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Washtafel Porcelin
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Washtafel Porcelin bh 1.000 Err:509 0.00 Err:509 0.00
Perlengkapan Err:509 0.00
Semen Portland kg 6.000 1,850.00 0.00 11,100.00 0.00
Bahan Pasir Pasang m3 0.010 235,000.00 0.00 2,350.00 0.00
Pekerja oh 1.000 0.00 Err:509 0.00 Err:509
Tukang batu oh 1.450 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.150 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.100 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Floor Drain / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor Drain bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.010 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Floor Drain Atap / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Floor Drain Stainlees Untuk Atap bh 1.000 Err:509 0.00 Err:509 0.00
Pekerja oh 0.010 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 6" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 6" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.100 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.170 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.017 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.002 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 4" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 4" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.081 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.135 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.014 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.004 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 3" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 3" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.081 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.135 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.014 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.004 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 2" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 2" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.054 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.090 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.009 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.003 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 1" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 1" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.036 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.060 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.002 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Pipa PVC dia 3/4" / M'
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Bahan Pipa PVC dia 3/4" m' 1.200 Err:509 0.00 Err:509 0.00
Pekerja oh 0.036 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.060 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.006 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.002 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pasang Kran Air 1/4 Putaran / Bh
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Kran Air bh 1.000 Err:509 0.00 Err:509 0.00
Bahan Seal tape bh 0.025 Err:509 0.00 Err:509 0.00
Pekerja oh 0.010 0.00 Err:509 0.00 Err:509
Tukang batu oh 0.100 0.00 Err:509 0.00 Err:509
Kepala tukang oh 0.010 0.00 Err:509 0.00 Err:509
Tenaga Mandor oh 0.005 0.00 Err:509 0.00 Err:509
Err:509 Err:509
Err:509
Pembuatan Septictank dan Peresapan / Unit
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Galian Tanah m3 6.760 Err:509 0.00 Err:509 0.00
Urugan Pasir dibawah lantai m3 0.190 Err:509 0.00 Err:509 0.00
Adukan Beton 1 : 3 : 5 m3 0.300 Err:509 0.00 Err:509 0.00
Beton camp. penutup septictank 1 : 2 : 3 m3 0.290 Err:509 0.00 Err:509 0.00
Pasangan Batu Tela 1 : 2 m3 1.080 Err:509 0.00 Err:509 0.00
Plesteran dinding 1 : 2 m2 15.000 Err:509 0.00 Err:509 0.00
Kerikil Koral m3 1.150 365,000.00 0.00 419,750.00 0.00
Sabuk kelapa/Ijuk ls 1.000 300,000.00 0.00 300,000.00 0.00
Pipa Paralon PVC dia 4" m' 16.000 Err:509 0.00 Err:509 0.00
Bahan Pipa Penguapan GIP dia 2 ls 1.000 100,000.00 0.00 100,000.00 0.00
Err:509 0.00
Err:509
Pembuatan Bak Kontrol Air Kotor / Unit
Kebutuhan Satuan Indeks Harga Satuan Bahan Harga Satuan upah Jml Harga Bahan Jml Harga upah
Galian Tanah m3 0.494 Err:509 0.00 Err:509 0.00
Urugan Pasir dibawah Pasangan Batu m3 0.013 Err:509 0.00 Err:509 0.00
Beton camp. 1 : 2 : 3 m3 0.042 Err:509 0.00 Err:509 0.00
Besi Beton Kg 7.000 Err:509 0.00 Err:509 0.00
Pasangan Batu Tela 1 : 2 m2 2.352 Err:509 0.00 Err:509 0.00
Plesteran dinding 1 : 2 m2 2.352 Err:509 0.00 Err:509 0.00
Bahan Kerikil Koral Uk. 3 - 5 cm m3 0.036 365,000.00 0.00 13,140.00 0.00
Err:509 0.00
Err:509
RENCANA ANGGARAN BIAYA ( RAB )

Paket : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI


Lokasi : JL. SPMA REREMI - KABUPATEN MANOKWARI
Tahun : 2017

Harga Satuan Jumlah Harga


NO. Uraian Pekerjaan Volume Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6

A. PEKERJAAN PEMBANGUNAN GEDUNG ASRAMA


I. PEKERJAAN PERSIAPAN
1 Foto Dokumentasi 1.00 Ls 1,500,000.00 1,500,000.00
2 Pembersihan Lokasi 1.00 Ls 7,500,000.00 7,500,000.00
3 Air Kerja Lapangan + Penerangan 1.00 Ls 3,000,000.00 3,000,000.00
4 Pembuatan Direksi Kit + Kemp Pekerja + Gudang Material 24.00 M2 400,000.00 9,600,000.00
5 Pembuatan Papan Nama Proyek 1.00 Ls 750,000.00 750,000.00
6 Pasang Bouwplank 160.00 M' 98,340.00 15,734,400.00
38,084,400.00
II. PEKERJAAN TANAH DAN PONDASI
1 Galian Tanah Untuk Pondasi 139.48 M3 90,200.00 12,581,096.00
2 Urugan Tanah Kembali 46.49 M3 64,900.00 3,017,201.00
3 Urugan Tanah Dipadatkan Untuk Peninggian Lantai 527.29 M3 315,700.00 166,465,453.00
4 Urugan Pasir dibawah Pondasi dan Lantai 55.45 M3 346,280.00 19,201,226.00
5 Pasangan Pondasi Batu Kosong 27.90 M3 675,092.00 18,835,066.80
6 Pasangan Pondasi Batu Kali Camp. 1 : 4 161.39 M3 1,133,550.00 182,943,634.50
403,043,677.30
III. PEKERJAAN BETON
1 Pek.Cor Lantai Kerja, Camp 1 : 3 : 5, Tebal 7 cm 42.67 M3 1,443,487.69 61,586,402.39
2 Pek. Lantai Rabat ( Cor Camp. 1 : 3 : 5 Tebal 5 cm + Plester + Aci Halus ) 220.50 M2 192,565.53 42,460,700.38
3 Pek. Kolom 20/20 10.68 M3 10,977,995.74 117,244,994.45
4 Pek. Kolom Praktis 10/10 202.60 M' 118,797.80 24,068,434.28
5 Pek. Sloof 15/20 11.56 M3 6,858,243.84 79,281,298.74
6 Pek. Balok Latei 12/30 0.40 M3 9,179,886.24 3,671,954.49
7 Pek. Ring Balok 15/20 11.56 M3 9,016,932.24 104,235,736.64
8 Pek. Plat Konsol, Tebal 10 cm 0.60 M3 5,771,426.24 3,462,855.74
9 Pek. Plat Meja Beton, Tebal 10 cm 0.38 M4 5,646,844.91 2,145,801.06
438,158,178.19
IV. PEKERJAAN PASANGAN DAN PLESTERAN
1 Pasangan Dinding Batu Tela 1/4 Batu, Camp. 1 : 4 1,129.23 M2 158,983.00 179,528,373.09
2 Pasangan Dinding Batu Tela 1/4 Batu, Camp. 1 : 2 ( Bak Air ) 43.38 M2 172,851.25 7,498,287.23
3 Plesteran 1 : 4 2,318.18 M2 75,827.40 175,781,562.13
4 Acian Dinding 2,318.18 M2 44,563.75 103,306,793.98
5 Pasangan Dinding Roster 3.84 M2 219,147.50 841,526.40
6 Pek. Keramik Lantai Uk. ( 40 x 40 )cm 469.13 M2 322,138.30 151,124,740.68
7 Pek. Keramik Lantai Anti Slep Uk. ( 20 x 20 )cm 84.58 M2 324,773.90 27,469,376.46
8 Pek. Keramik Dinding Uk. ( 20 x 25 ) cm 182.32 M2 338,957.30 61,798,694.94
707,349,354.90
V. PEKERJAAN KAYU DAN KACA
1 Pemasangan Konstruksi Kuda-kuda Kayu Besi 5/10 9.99 M3 8,884,700.00 88,737,718.19
2 Pemasangan Konstruksi Gording dan Ikatan Angin Kayu Besi 5/10 4.54 M3 6,281,000.00 28,538,665.65
3 Pembuatan dan Pemasangan Kusen Kayu Besi 5/10 4.50 M3 10,142,000.00 45,639,000.00
4 Pembuatan dan Pemasangan Daun Pintu Panel Kayu Besi 70.896 M2 785,125.00 55,662,222.00
5 Pembuatan dan Pemasangan Daun Jendela Panel Kaca 36.23 M2 702,968.75 25,470,526.13
6 Pemasangan Kaca Mati Riben tebal 5 mm 11.11 M2 319,429.00 3,548,856.19
7 Pemasangan Rangka Plafond ( 60 x 120 ) cm 792.25 M2 131,252.00 103,984,397.00
8 Pemasangan Plafond Tripleks Tebal 4 mm, Tanpa nat 792.25 M2 61,737.50 48,911,534.38
9 List Plafon Kayu 910.50 M' 23,529.00 21,423,154.50
10 Listplank Papan Kayu Besi 173.28 M' 108,267.50 18,760,592.40
440,676,666.43
VI. PEKERJAAN PENGGANTUNG DAN PENGUNCI
1 Pemasangan Kunci Tanam Tanam 2 Slaag 24.00 Buah 343,970.00 8,255,280.00
2 Pemasangan Kunci Tanam Tanam 1 Slaag 16.00 Buah 233,970.00 3,743,520.00
3 Pemasangan Engsel Pintu 120.00 Buah 60,476.90 7,257,228.00
4 Pemasangan Engsel Jendela 94.00 Buah 47,646.50 4,478,771.00
5 Pemasangan Spring Knip 47.00 Buah 45,006.50 2,115,305.50
6 Pemasangan Hak Angin 94.00 Buah 47,206.50 4,437,411.00
7 Pemasangan Expanyolet 3.00 Pasang 343,970.00 1,031,910.00
31,319,425.50
Harga Satuan Jumlah Harga
NO. Uraian Pekerjaan Volume Satuan
( Rp. ) ( Rp. )
1 2 3 4 5 6

VII. PEKERJAAN ATAP


1 Pasang Atap Zinc Galvalum ( Spandek ) 100 x 180, Tebal 0,5 mm 958.89 M2 178,534.79 171,195,229.45
2 Pasang Nok Atap Zinc Galvalum ( Spandek ), Tebal 0,5 mm 154.040 M' 176,264.00 27,151,706.56
3 Pemasangan Jurai Dalam Seng Plat Bjls 0,20 mm 61.540 M' 168,443.00 10,365,982.22
208,712,918.23
VIII. PEKERJAAN PENGECATAN
1 Cat Tembok Kwalitas Baik 2,318.182 M2 23,073.60 53,488,804.20
2 Cat Plafond 792.250 M2 27,391.10 21,700,598.98
3 Cat Kusen 143.000 M2 45,265.00 6,472,895.00
4 Teak Oil Pintu Panel 141.792 M2 48,636.50 6,896,266.61
5 Teak Oil Jendela Panil Kaca 32.610 M2 48,636.50 1,586,012.92
6 Cat List Plafond 91.050 M2 45,265.00 4,121,378.25
7 Cat Lisplank 86.640 M2 45,265.00 3,921,759.60
98,187,715.55
IX. PEKERJAAN LISTRIK
1 Pemasangan Lampu Philips XL 18 Watt 34.00 Buah 88,154.00 2,997,236.00
2 Pemasangan Lampu Philips XL 23 Watt 31.00 Buah 99,154.00 3,073,774.00
3 Pemasangan Saklar Tunggal 200 Watt 34.00 Buah 55,154.00 1,875,236.00
4 Pemasangan Saklar Ganda 200 Watt 8.00 Buah 66,154.00 529,232.00
5 Stop Kontak 200 Watt 39.00 Buah 55,154.00 2,151,006.00
6 Pasang Titik Nyala Lampu Penerangan 65.00 Titik 209,055.00 13,588,575.00
7 Pasang Titik Nyala Stop Kontak 39.00 Titik 231,055.00 9,011,145.00
8 Pasang Panel Induk + MCB 1.00 Unit 8,500,000.00 8,500,000.00
9 Pentanahan 40.00 Titik 400,000.00 16,000,000.00
10 Penyambungan Listrik PLN 1.00 Ls 30,000,000.00 30,000,000.00
87,726,204.00
X. PEKERJAAN SANITAIR
1 Pemasangan Kloset Jongkok 16.000 Buah 756,745.00 12,107,920.00
2 Pemasangan Whasbak Alluminium 1 Lobang 1.000 Buah 1,500,000.00 1,500,000.00
3 Pemasangan Pipa PVC Ø 2", Saluran Air Kotor 32.720 M' 51,701.10 1,691,659.99
4 Pemasangan Pipa PVC Ø 4", Saluran Tinja 119.240 M' 111,218.80 13,261,729.71
5 Pemasangan Pipa GIP Ø 1", Saluran Air Bersih 122.000 M' 90,376.00 11,025,872.00
6 Pemasangan Pipa GIP Ø 3/4", Saluran Air Bersih 34.500 M' 76,736.00 2,647,392.00
7 Pemasangan Floordrain 19.000 Buah 37,290.00 708,510.00
8 Pemasangan Kran Air 1/4 Putaran 23.000 Buah 114,400.00 2,631,200.00
9 Pembuatan Menara Air + Penampungan Air Fiber Kapasitas 1100 Liter 2.000 Unit 37,500,000.00 75,000,000.00
10 Pembuatan Septictank 4.000 Unit 6,917,693.55 27,670,774.21
11 Pembuatan Saluran Air ( Parit ) 154.180 M' 292,594.99 45,112,295.02
193,357,352.93
XI. PEKERJAAN LAIN-LAIN
1 Pembersihan Akhir 1.000 Ls 2,500,000.00 2,500,000.00
2 Pembuatan Sumur 1.000 Ls 15,000,000.00 15,000,000.00
3 Pembuatan Rumah Pompa + Pompa Air 2.000 Unit 3,500,000.00 7,000,000.00
24,500,000.00
XII. PEKERJAAN JALAN MASUK
1 Pekerjaan Timbunan Jalan Masuk 361.200 M3 315,700.00 114,030,840.00
2 Pekerjaan Timbunan Halaman 36.5530 M3 315,700.00 11,539,782.10
125,570,622.10
Vol.
Luas Vol. Vol. Kunci
KUSEN Jendela
KUSEN KUSEN Pintu
Kaca
PJ1 2.00 11.10 10.42 22.20 2.00 3.84 4.00
PJ2 8.00 10.16 27.58 81.28 8.00 11.52 16.00
P3 6.00 5.12 10.58 30.72 6.00
J1 4.00 7.56 9.41 30.24 7.68 8.00
V1 5.00 2.28 1.61 11.40
V2 42.00 1.10 3.15 46.20

62.74 222.04
1.60

PLESTERAN
130.96
148.98
59.06
54.4
105.56
103.96
14.64
8.08
625.64
Time Schedule
PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017
JANGKA WAKTU PELAKSANAAN : 120 (SERATUS DUA PULUH) HARI KALENDER

BOBOT JADWAL PELAKSANAAN BULAN KE :


NO ITEM PEKERJAAN
(%) I II III IV KETERANGAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
(a) (b) (c) (d) (e)

100
I. PEKERJAAN PERSIAPAN 3.94 1.31 1.31 1.31
90
II. PEKERJAAN TANAH DAN PASIR 3.97 0.99 0.99 0.99 0.99
80
III. PEKERJAAN PASANGAN, PLESTERAN DAN BET 47.75 6.82 6.82 6.82 6.82 6.82 6.82 6.82
70
IV. PEKERJAAN KAYU 18.81 3.13 3.13 3.13 3.13 3.13 3.13
60
V. PEKERJAAN ATAP DAN PLAFOND 13.33 2.67 2.67 2.67 2.67 2.67 50
VI. PEKERJAAN PENGECATAN 4.05 1.01 1.01 1.01 1.01 40
VII. PEKERJAAN ALAT GANTUNG DAN PENGUNCI 1.64 0.82 0.82 30
VIII. PEKERJAAN INSTALASI LISTRIK 3.28 1.09 1.09 1.09 20

IX. PEKERJAAN SANITAIR DAN LAIN-LAIN 3.23 1.08 1.08 1.08 10


0

RENCANA PRESTASI MINGGUAN 100.00 1.31 2.31 2.31 7.81 7.81 6.82 9.96 11.03 11.03 12.62 6.90 6.90 4.77 4.75 1.83 1.83

RENCANA PRESTASI KOMULATIF 1.31 3.62 5.93 13.74 21.56 28.38 38.34 49.37 60.40 73.02 79.92 86.81 91.58 96.34 98.17 100.00

REALISASI MINGGUAN
REALISASI KOMULATIF
Rekapitulasi

PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI


LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017

NO. URAIAN PEKERJAAN JUMLAH HARGA (Rp)

I. PEKERJAAN PERSIAPAN 32,760,600.00

II. PEKERJAAN TANAH DAN PASIR 33,006,397.48

III. PEKERJAAN PASANGAN, PLESTERAN DAN BETON 396,687,756.87

IV. PEKERJAAN KAYU 156,246,934.48

V. PEKERJAAN ATAP DAN PLAFOND 110,760,338.69

VI. PEKERJAAN PENGECATAN 33,645,436.53

VII. PEKERJAAN ALAT GANTUNG DAN PENGUNCI 13,587,895.20

VIII. PEKERJAAN INSTALASI LISTRIK 27,279,585.00

IX. PEKERJAAN SANITAIR DAN LAIN-LAIN 26,822,776.93

REAL COST 830,797,721.17

PPN 10% 83,079,772.12

JUMLAH 913,877,493.29

DIBULATKAN 913,877,000.00
TERBILANG :
SEMBILAN RATUS TIGA BELAS JUTA DELAPAN RATUS TUJUH PULUH TUJUH RIBU RUPIAH

Manokwari, 06 Juli 2017

CV. SINAR BULAN

Hj. HASNA NURDIN


Direktris
DAFTAR KUANTITAS DAN HARGA
PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017

HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)

I. PEKERJAAN PERSIAPAN
1 Pembongkaran bangunan lama dan Pembersihan Lokasi. 1.00 Ls 8,960,000.00 8,960,000.00
2 Foto Dokumentasi ( 0 % - 100 %) 3.00 Set 300,000.00 900,000.00
3 Pembuatan Papan Nama Proyek. 1.00 Ls 550,000.00 550,000.00
4 Pengukuran & Pemasangan Bowplank 90.00 M' 98,340.00 8,850,600.00
5 Pembuatan Gudang Bahan 1.00 Ls 6,000,000.00 6,000,000.00
6 Air Kerja Lapangan 1.00 Ls 1,500,000.00 1,500,000.00
7 Mobilisasi dan Demobilisasi Alat 1.00 Ls 6,000,000.00 6,000,000.00
Sub Total ( I ) 32,760,600.00
II. PEKERJAAN TANAH DAN PASIR
1 Pek. Galian Tanah Pondasi. 60.72 M3 90,200.00 5,476,944.00
2 Pek. Urugan Tanah Kembali. 20.24 M3 64,900.00 1,313,576.00
3 Pek. Memadatkan Tanah 54.79 M3 29,506.67 1,616,729.28
4 Pek. Urugan Pasir Bawah Pondasi. 5.52 M3 346,280.00 1,911,465.60
5 Pek. Urugan Pasir Bawah Lt. Ruang,Teras dan Rabat 15.57 M3 346,280.00 5,389,848.20
6 Pek. Urugan Tanah Peninggian Peil Lantai Ruang,Teras 54.79 M3 315,700.00 17,297,834.40
Dan Rabat.
Sub Total ( II ) 33,006,397.48
III. PEKERJAAN PASANGAN, PLESTERAN DAN BETON
1 Pasangan Batu Kosong. 14.49 M3 675,092.00 9,782,083.08
2 Pondasi Batu Kali, Camp. 1 : 4 41.06 M3 1,133,550.00 46,537,895.25
3 Cor Sloof Beton Bertlg 15/20 cm,Camp. 1 : 2 : 3 , 4.14 M3 6,858,243.84 28,393,129.48
4 Cor Kolom Beton Bertlg 12/12 cm,Camp. 1 : 2 : 3 , 2.12 M3 9,819,879.07 20,786,720.01
5 Cor Kolom Beton Bertlg 20/20 cm,Camp. 1 : 2 : 3 , 0.56 M3 10,977,995.74 6,147,677.61
6 Cor Ringbalk Beton Bertlg 12/15 cm,Camp. 1 : 2 : 3 , 2.48 M3 9,016,932.24 22,398,059.67
7 Cor Ringbalk Beton Bertlg 12/25 cm,Camp. 1 : 2 : 3 , 0.87 M3 9,016,932.24 7,844,731.04
8 Cor Balok Teras 12/20 cm, Camp. 1 : 2 : 3 , 0.36 M3 9,016,932.24 3,246,095.60
9 Cor plat Meja beton Camp. 1 : 2 : 3 , 0.14 M3 5,646,844.91 815,263.23
10 Pasang pondasi rabat Batu Tela 1/2 Batu Camp. 1 : 2, 45.00 M2 172,851.25 7,778,306.25
11 Pasang Batu Tela 1/4 Batu Camp. 1 : 2, 36.73 M2 172,851.25 6,349,172.12
12 Pasang Batu Tela 1/4 Batu Camp. 1 : 4, 352.59 M2 158,983.00 56,055,498.00
13 Plesteran Dinding Camp. 1 : 2 105.34 M2 82,900.84 8,732,774.49
14 Plesteran Dinding Camp. 1 : 4 583.96 M2 75,827.40 44,280,168.50
15 Cor Ruang dan Teras , Camp. 1 : 3 : 5 13.92 M3 1,443,487.69 20,093,348.68
16 Cor Rabat diplester dan Diaci 100.00 M2 192,565.53 19,256,553.46
17 Pasang Keramik Lantai Kamar dan Teras 40 x 40 cm 214.79 M2 322,138.30 69,192,729.73
18 Pasang Batu Gurat pada kolom teras 3.52 M2 354,447.50 1,247,655.20
19 Pasang Keramik 20 x 20 Lantai Km/Wc 6.36 M2 324,773.90 2,065,562.00
20 Pasang Keramik 20 x 25 Dinding Km/Wc 28.20 M2 338,957.30 9,558,595.86
21 Pasang Keramik 20 x 25 Meja beton 5.88 M2 338,957.30 1,992,052.05
22 Pasang Bak Air KM/WC lapis keramik 4.00 Unit 1,033,421.38 4,133,685.53
Sub Total ( III ) 396,687,756.87
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT SATUAN HARGA
(Rp) (Rp)
IV. PEKERJAAN KAYU
1 Pek. Kusen Kayu Besi 5/10 1.60 M3 10,142,000.00 16,213,893.70
2 Pek. Kuda - kuda + Bubungan kayu Besi 5/10 4.14 M3 8,884,700.00 36,791,542.70
3 Pek. Gording Kayu Matoa 5/10 2.75 M3 6,281,000.00 17,290,336.80
4 Pek. Pintu Panil Papan Kayu Besi 27.51 M2 785,125.00 21,598,788.75
5 Pek. Pasang Listplank Kayu Besi 2/25 Cm 90.00 M' 108,267.50 9,744,075.00
6 Pek. Pasang Rangka Plafond Kayu Matoa 291.88 M2 131,252.00 38,309,833.76
7 Pek. Pasang Jalusi Kayu Besi 2/10 Cm. 1.26 M2 605,440.00 762,854.40
8 Pasang Jendela Panel Kaca 22.10 M2 702,968.75 15,535,609.38

Sub Total ( IV ) 156,246,934.48


V. PEKERJAAN ATAP DAN PLAFOND
1 Pas. Atap Spandec tebal 0,30mm 389.72 M2 178,534.79 69,578,937.33
2 Pas. Bubungan Seng Plat BJLS 0,30 73.40 M' 168,443.00 12,363,716.20
Pasang Talang Jurai sengplat bjls 0,30 17.44 M' 168,443.00 2,937,645.92
3 Pas. Plafond Tripleks 4 mm 291.88 M2 61,737.50 18,019,941.50
4 Pasang List Plafond Profil SP 5 334.06 M' 23,529.00 7,860,097.74
Sub Total ( V ) 110,760,338.69
VI. PEKERJAAN PENGECATAN
1 Pek. Cat Kusen Pintu dan Jendela Dgn Cat Meni +Kilat 79.93 M2 45,265.00 3,618,230.62
2 Pek. Cat Lisplank dan Ventilasi Dengan Cat Meni + Kilat 44.88 M2 45,265.00 2,031,493.20
3 Pek. Cat List Plafond Dengan Cat Meni + Kilat 23.38 M2 45,265.00 1,058,485.81
4 Pek. Politur Pintu Panil Papan dan Panel Jendela 62.46 M2 48,636.50 3,037,680.15
5 Pek. Cat Dinding Tembok Dengan Cat Tembok 689.30 M2 23,073.60 15,904,632.48
6 Pek. Pengecatan Plafond Dengan Cat Tembok 291.88 M2 27,391.10 7,994,914.27
Sub Total ( VI ) 33,645,436.53
VII. PEKERJAAN ALAT GANTUNG DAN PENGUNCI
1 Pasang Kunci Pintu Tanam 2 Slaag 14.00 Bh 343,970.00 4,815,580.00
2 Pasang Engsel Pintu 48.00 Bh 60,476.90 2,902,891.20
3 Pasang Engsel Jendela 64.00 Bh 22,000.00 1,408,000.00
4 Pasang Spring Knip 32.00 Bh 45,006.50 1,440,208.00
5 Pasang Hak Angin Jendela 64.00 Bh 47,206.50 3,021,216.00
Sub Total ( VII ) 13,587,895.20
VIII. PEKERJAAN INSTALASI LISTRIK
1 Pasang Lampu SL 18 Watt + Fitting Biasa. 30.00 Ttk 99,154.00 2,974,620.00
2 Pasang Lampu SL 10 Watt + Fitting Biasa. 4.00 Ttk 88,154.00 352,616.00
3 Pasang Stop Kontak. 11.00 Ttk 55,154.00 606,694.00
4 Pas. Saklar Ganda 14.00 Ttk 66,154.00 926,156.00
5 Pas. Saklar Tunggal 6.00 Ttk 55,154.00 330,924.00
6 Pasang Panel Induk + MCB 1.00 Unit 8,500,000.00 8,500,000.00
7 Instalasi Penerangan 65.00 Ttk 209,055.00 13,588,575.00
Sub Total ( VIII ) 27,279,585.00
IX. PEKERJAAN SANITAIR DAN LAIN-LAIN
1 Pek. Septictank + Peresapan. 2.00 Unit 6,917,693.55 13,835,387.10
2 Pek. Pasang Klosed Jongkok. 4.00 Bh 756,745.00 3,026,980.00
3 Pek. Pasang Kran 1/2 " 5.00 M' 114,400.00 572,000.00
4 Pek. Pasang Pipa PVC 4 " 26.48 M' 111,218.80 2,945,073.82
5 Pek. Pasang Pipa PVC 3/4" 54.92 M' 76,736.00 4,214,341.12
6 Pek. Pasang Pipa PVC 1/2" 17.33 M' 76,736.00 1,329,834.88
7 Pek. Pasang Floor Drain 4.00 Bh 37,290.00 149,160.00
8 Pembersihan Akhir 1.00 Ls 750,000.00 750,000.00
Sub Total ( IX ) 26,822,776.93

JUMLAH 830,797,721.17
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
LOKASI : JL. SPMA REREMI - KABUPATEN MANOKWARI
TAHUN : 2017

1 M' Pengukuran & Pemasangan Bowplank A.2.2.1.4


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 23,350.00
B BAHAN
1 Balok Kayu Matoa 5/7 M3 0.012 3,400,000.00 40,800.00
2 Papan Kayu Matoa 3/20 M3 0.007 3,550,000.00 24,850.00
3 Paku Kg 0.020 20,000.00 400.00
JUMLAH HARGA BAHAN 66,050.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 89,400.00
E Overhead & Profit 10 % x D 8,940.00
F Harga Satuan Pekerjaan ( D + E ) 98,340.00

1 M3 Galian Tanah Biasa A.2.3.1.1


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.750 105,000.00 78,750.00
2 Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 82,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 82,000.00
E Overhead & Profit 10 % x D 8,200.00
F Harga Satuan Pekerjaan ( D + E ) 90,200.00

1 M3 Urugan Tanah Kembali A.2.3.1.9


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.500 105,000.00 52,500.00
2 Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 59,000.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 59,000.00
E Overhead & Profit 10 % x D 5,900.00
F Harga Satuan Pekerjaan ( D + E ) 64,900.00
1 M3 Pemadatan Tanah A.2.3.1.
Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.250 105,000.00 26,250.00
2 Mandor L.04 OH 0.008 130,000.00 1,083.33
JUMLAH TENAGA KERJA 27,333.33
B BAHAN
M3 -
JUMLAH HARGA BAHAN -
C PERALATAN
Jam -
JUMLAH HARGA PERALATAN -
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 27,333.33
E Overhead & Profit 10 % x D 2,733.33
F Harga Satuan Pekerjaan ( D + E ) 30,066.67

1 M3 Urugan Tanah Dipadatkan A.2.3.1.


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.500 105,000.00 52,500.00
2 Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 59,000.00
B BAHAN
1 Tanah Urug M3 1.200 180,000.00 216,000.00
JUMLAH HARGA BAHAN 216,000.00
C PERALATAN
1 Stamper Jam 0.300 40,000.00 12,000.00
JUMLAH HARGA PERALATAN 12,000.00
D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 287,000.00
E Overhead & Profit 10 % x D 28,700.00
F Harga Satuan Pekerjaan ( D + E ) 315,700.00

1 M3 Urugan Pasir A.2.3.1.11


Harga Jumlah
No. Uraian Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 32,800.00
B BAHAN
1 Pasir Urug M3 1.200 235,000.00 282,000.00
JUMLAH HARGA BAHAN 282,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 314,800.00
E Overhead & Profit 10 % x D 31,480.00
F Harga Satuan Pekerjaan ( D + E ) 346,280.00
1 M3 Pasangan Batu Kosong A.3.2.1.9
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang Batu L.02 OH 0.400 110,000.00 44,000.00
3 Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
4 Mandor L.04 OH 0.080 130,000.00 10,400.00
JUMLAH TENAGA KERJA 164,200.00
B BAHAN
1 Batu Kali M3 1.200 290,000.00 348,000.00
2 Pasir Pasang/Urug M3 0.432 235,000.00 101,520.00
JUMLAH HARGA BAHAN 449,520.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 613,720.00
E Overhead & Profit 10 % x D 61,372.00
F Harga Satuan Pekerjaan ( D + E ) 675,092.00

1 M3 Pasangan Batu Kali Dengan Campuran 1 PC : 4 A.3.2.1.2


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.500 105,000.00 157,500.00
2 Tukang Batu L.02 OH 0.750 110,000.00 82,500.00
3 Kepala Tukang L.03 OH 0.075 120,000.00 9,000.00
4 Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 258,750.00
B BAHAN
1 Batu Kali M3 1.200 290,000.00 348,000.00
2 Portland Cement Kg 163.000 1,850.00 301,550.00
3 Pasir Pasang M3 0.520 235,000.00 122,200.00
JUMLAH HARGA BAHAN 771,750.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 1,030,500.00
E Overhead & Profit 10 % x D 103,050.00
F Harga Satuan Pekerjaan ( D + E ) 1,133,550.00

1 M3 Membuat Beton Camp. 1 : 3 : 5 A.4.1.1.5


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
4 Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 217,650.00
B BAHAN
1 Portland Cement Kg 326.000 1,850.00 603,100.00
2 Pasir Beton Kg 760.000 210.00 159,600.00
3 Kerikil Cor Kg 1,029.000 280.77 288,911.54
4 Air Liter 215.000 200.00 43,000.00
JUMLAH HARGA BAHAN 1,094,611.54
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 1,312,261.54
E Overhead & Profit 10 % x D 131,226.15
F Harga Satuan Pekerjaan ( D + E ) 1,443,487.69
1 M3 Membuat Beton Camp. 1 : 2 : 3 A.4.1.1.6
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.650 105,000.00 173,250.00
2 Tukang Batu L.02 OH 0.275 110,000.00 30,250.00
3 Kepala Tukang L.03 OH 0.028 120,000.00 3,360.00
4 Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 217,650.00
B BAHAN
1 Portland Cement Kg 352.000 1,850.00 651,200.00
2 Pasir Beton Kg 731.000 210.00 153,510.00
3 Kerikil Pecah/Cipping Kg 1,031.000 376.15 387,814.62
4 Air Liter 215.000 200.00 43,000.00
JUMLAH HARGA BAHAN 1,235,524.62
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 1,453,174.62
E Overhead & Profit 10 % x D 145,317.46
F Harga Satuan Pekerjaan ( D + E ) 1,598,492.08

10 Kg Pembesian Besi Polos Dan Ulir A.4.1.1.17


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang Besi L.02 OH 0.070 110,000.00 7,700.00
3 Kepala Tukang L.03 OH 0.007 120,000.00 840.00
4 Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 16,410.00
B BAHAN
1 Besi Beton Kg 10.500 17,500.00 183,750.00
2 Kawat Beton Kg 0.150 22,500.00 3,375.00
JUMLAH HARGA BAHAN 187,125.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 203,535.00
E Overhead & Profit 10 % x D 20,353.50
F Harga Satuan Pekerjaan 10 Kg ( D + E ) 223,888.50
G Harga Satuan Pekerjaan 1 Kg 22,388.85

1 M2 Bekisting Sloof A.4.1.1.21


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.520 105,000.00 54,600.00
2 Tukang Kayu L.02 OH 0.260 110,000.00 28,600.00
3 Kepala Tukang L.03 OH 0.026 120,000.00 3,120.00
4 Mandor L.04 OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 89,700.00
B BAHAN
1 Kayu Kelas III M3 0.045 2,500,000.00 112,500.00
2 Paku Campur Kg 0.300 20,000.00 6,000.00
JUMLAH HARGA BAHAN 118,500.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 208,200.00
E Overhead & Profit 10 % x D 20,820.00
F Harga Satuan Pekerjaan ( D + E ) 229,020.00
1 M2 Bekisting Kolom A.4.1.1.22
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
3 Kepala Tukang L.03 OH 0.033 120,000.00 3,960.00
4 Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 113,850.00
B BAHAN
1 Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
2 Paku Campur Kg 0.400 20,000.00 8,000.00
3 Balok Kayu Kelas II M3 0.010 3,400,000.00 34,000.00
4 Dolken Kayu Batang 2.000 30,000.00 60,000.00
JUMLAH HARGA BAHAN 202,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 315,850.00
E Overhead & Profit 10 % x D 31,585.00
F Harga Satuan Pekerjaan ( D + E ) 347,435.00

1 M2 Bekisting Balok A.4.1.1.23


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.660 105,000.00 69,300.00
2 Tukang Kayu L.02 OH 0.330 110,000.00 36,300.00
3 Kepala Tukang L.03 OH 0.033 120,000.00 3,960.00
4 Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 113,850.00
B BAHAN
1 Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
2 Paku Campur Kg 0.400 20,000.00 8,000.00
3 Balok Kayu Kelas II M3 0.010 3,400,000.00 34,000.00
4 Dolken Kayu Batang 2.000 30,000.00 60,000.00
JUMLAH HARGA BAHAN 202,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 315,850.00
E Overhead & Profit 10 % x D 31,585.00
F Harga Satuan Pekerjaan ( D + E ) 347,435.00

1 M2 Bekisting Plat Meja Beton A.4.1.1.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,750.00
B BAHAN
1 Kayu Kelas III M3 0.040 2,500,000.00 100,000.00
2 Paku Campur Kg 0.400 20,000.00 8,000.00
3 Dolken Kayu Batang 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 138,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 189,750.00
E Overhead & Profit 10 % x D 18,975.00
F Harga Satuan Pekerjaan ( D + E ) 208,725.00
1 M2 Pek. Lantai Rabat A.4.1.1
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 3 : 5 M3 0.050 1,443,487.69 72,174.38
2 Plesteran 1 : 4 M2 1.000 75,827.40 75,827.40
3 Acian M2 1.000 44,563.75 44,563.75
JUMLAH HARGA BAHAN 192,565.53
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 192,565.53

1 M3 Kolom Praktis 12/12 A.4.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 2 : 3 M3 0.980 1,598,492.08 1,566,522.24
2 Besi Beton Kg 110.000 22,388.85 2,462,773.50
3 Bekisting M2 16.667 347,435.00 5,790,583.33
JUMLAH HARGA BAHAN 9,819,879.07
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 9,819,879.07

1 M3 Kolom Uk. ( 20 x 20 ) cm A.4.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 2 : 3 M3 0.980 1,598,492.08 1,566,522.24
2 Besi Beton Kg 110.000 22,388.85 2,462,773.50
3 Bekisting M2 20.000 347,435.00 6,948,700.00
JUMLAH HARGA BAHAN 10,977,995.74
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 10,977,995.74

1 M3 Sloof Uk. ( 15 x 20 ) cm A.4.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 2 : 3 M3 0.980 1,598,492.08 1,566,522.24
2 Besi Beton Kg 100.000 22,388.85 2,238,885.00
3 Bekisting M2 13.330 229,020.00 3,052,836.60
JUMLAH HARGA BAHAN 6,858,243.84
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 6,858,243.84
1 M3 Ring Balok Uk. ( 15 x 20 ) cm A.4.1.1
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 2 : 3 M3 0.980 1,598,492.08 1,566,522.24
2 Besi Beton Kg 100.000 22,388.85 2,238,885.00
3 Bekisting M2 15.000 347,435.00 5,211,525.00
JUMLAH HARGA BAHAN 9,016,932.24
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 9,016,932.24

1 M3 Cor Meja Beton Tebal 8 Cm A.4.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Cor Beton Camp. 1 : 2 : 3 M3 0.990 1,598,492.08 1,582,507.16
2 Besi Beton Kg 65.000 22,388.85 1,455,275.25
3 Bekisting M2 12.500 208,725.00 2,609,062.50
JUMLAH HARGA BAHAN 5,646,844.91
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 5,646,844.91

1 M2 Memasang Dinding Bata tebal 1/4 bata, camp. 1 A.4.4.1.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
1 Batu Tela Bh 27.000 2,500.00 67,500.00
2 Portland Cement Kg 18.950 1,850.00 35,057.50
3 Pasir Pasang M3 0.038 235,000.00 8,930.00
JUMLAH HARGA BAHAN 111,487.50
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 157,137.50
E Overhead & Profit 10 % x D 15,713.75
F Harga Satuan Pekerjaan ( D + E ) 172,851.25
1 M2 Memasang Dinding Bata tebal 1/4 bata, camp. 1 A.4.4.1.
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
1 Batu Tela Bh 27.000 2,500.00 67,500.00
2 Portland Cement Kg 11.500 1,850.00 21,275.00
3 Pasir Pasang M3 0.043 235,000.00 10,105.00
JUMLAH HARGA BAHAN 98,880.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 144,530.00
E Overhead & Profit 10 % x D 14,453.00
F Harga Satuan Pekerjaan ( D + E ) 158,983.00

1 M2 Plesteran 1 : 2, Tebal 15 mm A.4.4.2.2


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,750.00
B BAHAN
1 Portland Cement Kg 10.224 1,850.00 18,914.40
2 Pasir Plester M3 0.020 235,000.00 4,700.00
JUMLAH HARGA BAHAN 23,614.40
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 75,364.40
E Overhead & Profit 10 % x D 7,536.44
F Harga Satuan Pekerjaan ( D + E ) 82,900.84

1 M2 Plesteran 1 : 4, Tebal 15 mm A.4.4.2.4


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,750.00
B BAHAN
1 Portland Cement Kg 6.240 1,850.00 11,544.00
2 Pasir Pasang M3 0.024 235,000.00 5,640.00
JUMLAH HARGA BAHAN 17,184.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 68,934.00
E Overhead & Profit 10 % x D 6,893.40
F Harga Satuan Pekerjaan ( D + E ) 75,827.40
1 M2 Acian A.4.4.2.27
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,500.00
B BAHAN
1 Portland Cement Kg 3.250 1,850.00 6,012.50
JUMLAH HARGA BAHAN 6,012.50
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 40,512.50
E Overhead & Profit 10 % x D 4,051.25
F Harga Satuan Pekerjaan ( D + E ) 44,563.75

1 M2 Pasang Dinding Batu Alam, Camp. 1 : 4 A.4.4.3.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Batu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,650.00
B BAHAN
1 Batu Alam motif bergaris M2 1.000 248,000.00 248,000.00
2 Portlan Cement Kg 11.000 1,850.00 20,350.00
3 Pasir Pasang M3 0.035 235,000.00 8,225.00
JUMLAH HARGA BAHAN 276,575.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 322,225.00
E Overhead & Profit 10 % x D 32,222.50
F Harga Satuan Pekerjaan ( D + E ) 354,447.50

1 M2 Pasang Keramik Lantai Uk. ( 40 x 40 ) cm A.4.4.3.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang Batu L.02 OH 0.350 110,000.00 38,500.00
3 Kepala Tukang L.03 OH 0.035 120,000.00 4,200.00
4 Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,750.00
B BAHAN
1 Keramik Lantai Uk. (40x40) cm Buah 6.630 18,500.00 122,655.00
2 Portlan Cement Kg 9.980 1,850.00 18,463.00
3 Pasir Pasang M3 0.045 235,000.00 10,575.00
4 Semen Warna Kg 1.300 15,700.00 20,410.00
JUMLAH HARGA BAHAN 172,103.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 292,853.00
E Overhead & Profit 10 % x D 29,285.30
F Harga Satuan Pekerjaan ( D + E ) 322,138.30
1 M2 Pasang Lantai Keramik Anti Slip Uk. ( 20 x 20 ) A.4.4.3.
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.700 105,000.00 73,500.00
2 Tukang Batu L.02 OH 0.350 110,000.00 38,500.00
3 Kepala Tukang L.03 OH 0.035 120,000.00 4,200.00
4 Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,750.00
B BAHAN
1 Keramik Anti Sleep Uk. (20x20) cm Buah 26.500 4,500.00 119,250.00
2 Portlan Cement Kg 10.400 1,850.00 19,240.00
3 Pasir Pasang M3 0.045 235,000.00 10,575.00
4 Semen Warna Kg 1.620 15,700.00 25,434.00
JUMLAH HARGA BAHAN 174,499.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 295,249.00
E Overhead & Profit 10 % x D 29,524.90
F Harga Satuan Pekerjaan ( D + E ) 324,773.90

1 M2 Pasang Keramik Dinding Uk. ( 20 x 25 ) cm A.4.4.3.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.800 105,000.00 84,000.00
2 Tukang Batu L.02 OH 0.400 110,000.00 44,000.00
3 Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
4 Mandor L.04 OH 0.040 130,000.00 5,200.00
JUMLAH TENAGA KERJA 138,000.00
B BAHAN
1 Keramik Dinding Uk. (20x25) cm Buah 21.500 5,500.00 118,250.00
2 Portlan Cement Kg 9.300 1,850.00 17,205.00
3 Pasir Pasang M3 0.018 235,000.00 4,230.00
4 Semen Warna Kg 1.940 15,700.00 30,458.00
JUMLAH HARGA BAHAN 170,143.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 308,143.00
E Overhead & Profit 10 % x D 30,814.30
F Harga Satuan Pekerjaan ( D + E ) 338,957.30

1 Unit Pasang Bak Air KM/WC lapis keramik A.4.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Pasangan Batu tela Camp. 1 : 2 M2 0.960 172,851.25 165,937.20
2 Pasang Keramik M2 2.390 338,957.30 809,938.47
3 Cor Beton Camp. 1 : 2 : 3 M3 0.036 1,598,492.08 57,545.71
JUMLAH HARGA BAHAN 1,033,421.38
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 1,033,421.38
1 M3 Pemasangan Konstruksi Kuda-kuda Kayu Besi A.4.6.1.1
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 4.000 105,000.00 420,000.00
2 Tukang Kayu L.02 OH 12.000 110,000.00 1,320,000.00
3 Kepala Tukang L.03 OH 1.200 120,000.00 144,000.00
4 Mandor L.04 OH 0.200 130,000.00 26,000.00
JUMLAH TENAGA KERJA 1,910,000.00
B BAHAN
1 Balok Kayu Besi M3 1.100 5,300,000.00 5,830,000.00
2 Besi Strip Tebal 5mm Kg 15.000 15,000.00 225,000.00
3 Paku Campuran Kg 5.600 20,000.00 112,000.00
JUMLAH HARGA BAHAN 6,167,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 8,077,000.00
E Overhead & Profit 10 % x D 807,700.00
F Harga Satuan Pekerjaan ( D + E ) 8,884,700.00

1 M3 Pemasangan Konstruksi Gording Kayu Matoa A.4.6.1.15


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 4.000 105,000.00 420,000.00
2 Tukang Kayu L.02 OH 12.000 110,000.00 1,320,000.00
3 Kepala Tukang L.03 OH 1.200 120,000.00 144,000.00
4 Mandor L.04 OH 0.200 130,000.00 26,000.00
JUMLAH TENAGA KERJA 1,910,000.00
B BAHAN
1 Balok Kayu Matoa 5/10 M3 1.100 3,400,000.00 3,740,000.00
2 Paku Campuran Kg 3.000 20,000.00 60,000.00
JUMLAH HARGA BAHAN 3,800,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 5,710,000.00
E Overhead & Profit 10 % x D 571,000.00
F Harga Satuan Pekerjaan ( D + E ) 6,281,000.00

1 M3 Pembuatan dan Pemasangan Kusen Kayu Besi A.4.6.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 7.000 105,000.00 735,000.00
2 Tukang Kayu L.02 OH 21.000 110,000.00 2,310,000.00
3 Kepala Tukang L.03 OH 2.100 120,000.00 252,000.00
4 Mandor L.04 OH 0.350 130,000.00 45,500.00
JUMLAH TENAGA KERJA 3,342,500.00
B BAHAN
1 Balok Kayu Besi 6/12 M3 1.100 5,300,000.00 5,830,000.00
2 Paku Campuran Kg 1.250 20,000.00 25,000.00
3 Lem Kayu Kg 1.000 22,500.00 22,500.00
JUMLAH HARGA BAHAN 5,877,500.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 9,220,000.00
E Overhead & Profit 10 % x D 922,000.00
F Harga Satuan Pekerjaan ( D + E ) 10,142,000.00
1 M2 Pembuatan dan Pemasangan Daun Pintu Panel A.4.6.1.5
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 1.000 105,000.00 105,000.00
2 Tukang Kayu L.02 OH 3.000 110,000.00 330,000.00
3 Kepala Tukang L.03 OH 0.300 120,000.00 36,000.00
4 Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 477,500.00
B BAHAN
1 Papan Kayu Besi M3 0.040 5,625,000.00 225,000.00
2 Lem Kayu Kg 0.500 22,500.00 11,250.00
JUMLAH HARGA BAHAN 236,250.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 713,750.00
E Overhead & Profit 10 % x D 71,375.00
F Harga Satuan Pekerjaan ( D + E ) 785,125.00

1 M2 Pembuatan dan Pemasangan Daun Jendela Pane A.4.6.1.6


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Kayu L.02 OH 2.400 110,000.00 264,000.00
3 Kepala Tukang L.03 OH 0.240 120,000.00 28,800.00
4 Mandor L.04 OH 0.040 130,000.00 5,200.00
JUMLAH TENAGA KERJA 329,500.00
B BAHAN
1 Papan Kayu Besi M3 0.024 5,625,000.00 135,000.00
2 Kaca Riben 5 mm M2 0.750 223,750.00 167,812.50
3 Lem Kayu Kg 0.300 22,500.00 6,750.00
JUMLAH HARGA BAHAN 309,562.50
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 639,062.50
E Overhead & Profit 10 % x D 63,906.25
F Harga Satuan Pekerjaan ( D + E ) 702,968.75

1 M2 Pek. Pasang Jalusi Kayu Besi 2/10 Cm. A.4.6.1.6


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.670 105,000.00 70,350.00
2 Tukang Kayu L.02 OH 2.000 110,000.00 220,000.00
3 Kepala Tukang L.03 OH 0.200 120,000.00 24,000.00
4 Mandor L.04 OH 0.335 130,000.00 43,550.00
JUMLAH TENAGA KERJA 357,900.00
B BAHAN
1 Papan Kayu Besi M3 0.033 5,625,000.00 187,500.00
2 Paku Campuran Kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 192,500.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 550,400.00
E Overhead & Profit 10 % x D 55,040.00
F Harga Satuan Pekerjaan ( D + E ) 605,440.00
1 M2 Pemasangan Rangka Plafond ( 60 x 120 ) cm, Ka A.4.6.1.20
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Kayu L.02 OH 0.300 110,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.030 120,000.00 3,600.00
4 Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 58,900.00
B BAHAN
1 Balok Kayu Matoa M3 0.016 3,400,000.00 55,420.00
2 Paku Campuran Kg 0.250 20,000.00 5,000.00
JUMLAH HARGA BAHAN 60,420.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 119,320.00
E Overhead & Profit 10 % x D 11,932.00
F Harga Satuan Pekerjaan ( D + E ) 131,252.00

1 M2 Pemasangan Plafond Tripleks 4 mm, Tanpa Nat A.4.5.1.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 23,350.00
B BAHAN
1 Tripleks 4 mm Lmbar 0.375 85,000.00 31,875.00
2 Paku Tripleks Kg 0.030 30,000.00 900.00
JUMLAH HARGA BAHAN 32,775.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 56,125.00
E Overhead & Profit 10 % x D 5,612.50
F Harga Satuan Pekerjaan ( D + E ) 61,737.50

1 M' List Plafon Kayu A.4.5.1.9


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Kayu L.02 OH 0.050 110,000.00 5,500.00
3 Kepala Tukang L.03 OH 0.005 120,000.00 600.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 11,740.00
B BAHAN
1 List Kayu Diprofil M' 1.050 9,000.00 9,450.00
2 Paku Campuran Kg 0.010 20,000.00 200.00
JUMLAH HARGA BAHAN 9,650.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 21,390.00
E Overhead & Profit 10 % x D 2,139.00
F Harga Satuan Pekerjaan ( D + E ) 23,529.00
1 M' Listplank Papan Kayu Besi A.4.6.1.21
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.100 105,000.00 10,500.00
2 Tukang Kayu L.02 OH 0.200 110,000.00 22,000.00
3 Kepala Tukang L.03 OH 0.020 120,000.00 2,400.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 35,550.00
B BAHAN
1 Papan Kayu Besi M3 0.011 5,625,000.00 61,875.00
2 Paku Campur M2 0.050 20,000.00 1,000.00
JUMLAH HARGA BAHAN 62,875.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 98,425.00
E Overhead & Profit 10 % x D 9,842.50
F Harga Satuan Pekerjaan ( D + E ) 108,267.50

1 Buah Pemasangan Kunci Tanam Tanam 2 Slaag A.4.6.2.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang Kayu L.02 OH 0.500 110,000.00 55,000.00
3 Kepala Tukang L.03 OH 0.050 120,000.00 6,000.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 62,700.00
B BAHAN
1 Kunci Tanam 2 Slaag Kualitas Baik Bh 1.000 250,000.00 250,000.00
JUMLAH HARGA BAHAN 250,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 312,700.00
E Overhead & Profit 10 % x D 31,270.00
F Harga Satuan Pekerjaan ( D + E ) 343,970.00

1 Buah Pemasangan Engsel Pintu A.4.6.2.5


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.001 130,000.00 104.00
JUMLAH TENAGA KERJA 19,979.00
B BAHAN
1 Engsel pintu Ring Nylon 4 " Bh 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 54,979.00
E Overhead & Profit 10 % x D 5,497.90
F Harga Satuan Pekerjaan ( D + E ) 60,476.90
1 Buah Pemasangan Engsel Jendela A.4.6.2.6
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang Kayu L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.001 130,000.00 65.00
JUMLAH TENAGA KERJA 13,315.00
B BAHAN
1 Engsel Jendela Ring Nylon 4 " Bh 1.000 30,000.00 30,000.00
JUMLAH HARGA BAHAN 30,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 43,315.00
E Overhead & Profit 10 % x D 4,331.50
F Harga Satuan Pekerjaan ( D + E ) 47,646.50

1 Buah Pemasangan Spring Knip A.4.6.2.8


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 20,915.00
B BAHAN
1 Spring Knip Bh 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 40,915.00
E Overhead & Profit 10 % x D 4,091.50
F Harga Satuan Pekerjaan ( D + E ) 45,006.50

1 Buah Pemasangan Hak Angin A.4.6.2.9


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.015 105,000.00 1,575.00
2 Tukang Kayu L.02 OH 0.150 110,000.00 16,500.00
3 Kepala Tukang L.03 OH 0.015 120,000.00 1,800.00
4 Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 20,915.00
B BAHAN
1 Hak Angin Lipat Bh 1.000 22,000.00 22,000.00
JUMLAH HARGA BAHAN 22,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 42,915.00
E Overhead & Profit 10 % x D 4,291.50
F Harga Satuan Pekerjaan ( D + E ) 47,206.50
1 M2 Pasang Atap Zinc Galvalum ( Spandek ) , Tebal A.4.5.2.
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 33,330.00
B BAHAN
1 Atap Zinc Galvalum ( Spandek ), Tebal 0,3 mm M' 1.282 85,000.00 108,974.36
2 Paku Atap Kg 0.250 80,000.00 20,000.00
JUMLAH HARGA BAHAN 128,974.36
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 162,304.36
E Overhead & Profit 10 % x D 16,230.44
F Harga Satuan Pekerjaan ( D + E ) 178,534.79

1 M' Pemasangan Nok Bubungan dan Jurai Dalam, SenA.4.5.2.


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.200 105,000.00 21,000.00
2 Tukang Kayu L.02 OH 0.400 110,000.00 44,000.00
3 Kepala Tukang L.03 OH 0.040 120,000.00 4,800.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 69,930.00
B BAHAN
1 Seng Plat Bjls 0,30mm M2 0.550 20,000.00 11,000.00
2 Paku Anti Karat M' 0.015 80,000.00 1,200.00
3 Papan Kayu Matoa M3 0.020 3,550,000.00 71,000.00
JUMLAH HARGA BAHAN 83,200.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 153,130.00
E Overhead & Profit 10 % x D 15,313.00
F Harga Satuan Pekerjaan ( D + E ) 168,443.00

1 M2 Pengecatan Tembok Baru (1 Lapis Plamur, 1 LapiA.4.7.1.10


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang Cat L.02 OH 0.063 110,000.00 6,930.00
3 Kepala Tukang L.03 OH 0.006 120,000.00 756.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 10,176.00
B BAHAN
1 Plamur Kg 0.100 10,000.00 1,000.00
2 Cat Dasar Kg 0.100 20,000.00 2,000.00
3 Cat Penutup ( Interior ) Kg 0.260 30,000.00 7,800.00
JUMLAH HARGA BAHAN 10,800.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 20,976.00
E Overhead & Profit 10 % x D 2,097.60
F Harga Satuan Pekerjaan ( D + E ) 23,073.60
1 M2 Pengecatan Plafond Baru Dengan Cat Tembok (1 LA.4.7.1.
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.020 105,000.00 2,100.00
2 Tukang Cat L.02 OH 0.072 110,000.00 7,920.00
3 Kepala Tukang L.03 OH 0.006 120,000.00 756.00
4 Mandor L.04 OH 0.003 130,000.00 325.00
JUMLAH TENAGA KERJA 11,101.00
B BAHAN
1 Plamur Kg 0.120 10,000.00 1,200.00
2 Cat Dasar Kg 0.120 20,000.00 2,400.00
3 Cat Penutup Kg 0.340 30,000.00 10,200.00
JUMLAH HARGA BAHAN 13,800.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 24,901.00
E Overhead & Profit 10 % x D 2,490.10
F Harga Satuan Pekerjaan ( D + E ) 27,391.10

1 M2 Pengecatan Kilap Kayu Baru (1 Lapis Plamur, 1 L A.4.7.1.4


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.070 105,000.00 7,350.00
2 Tukang Cat L.02 OH 0.009 110,000.00 990.00
3 Kepala Tukang L.03 OH 0.006 120,000.00 720.00
4 Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 9,450.00
B BAHAN
1 Plamur Kg 0.200 35,000.00 7,000.00
2 Cat Meni Kg 0.150 35,000.00 5,250.00
3 Cat Dasar Kg 0.170 20,000.00 3,400.00
4 Cat Penutup Kg 0.260 55,000.00 14,300.00
5 Kuas Bh 0.010 15,000.00 150.00
6 Pengecer Kg 0.030 20,000.00 600.00
7 Amplas Lbr 0.200 5,000.00 1,000.00
JUMLAH HARGA BAHAN 31,700.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 41,150.00
E Overhead & Profit 10 % x D 4,115.00
F Harga Satuan Pekerjaan ( D + E ) 45,265.00

1 M2 Pengecatan Dengan Teak Oil A.4.7.1.6


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.040 105,000.00 4,200.00
2 Tukang Cat L.02 OH 0.063 110,000.00 6,930.00
3 Kepala Tukang L.03 OH 0.063 120,000.00 7,560.00
4 Mandor L.04 OH 0.003 130,000.00 325.00
JUMLAH TENAGA KERJA 19,015.00
B BAHAN
1 Teak Oil Kg 0.360 70,000.00 25,200.00
JUMLAH HARGA BAHAN 25,200.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 44,215.00
E Overhead & Profit 10 % x D 4,421.50
F Harga Satuan Pekerjaan ( D + E ) 48,636.50
1 Buah Pemasangan Lampu Philips XL 18 Watt
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Listrik L.02 OH 0.080 110,000.00 8,800.00
3 Kepala Tukang L.03 OH 0.008 120,000.00 960.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,140.00
B BAHAN
1 Lampu Philips 18 Watt + Pitting Kg 1.000 65,000.00 65,000.00
JUMLAH HARGA BAHAN 65,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 80,140.00
E Overhead & Profit 10 % x D 8,014.00
F Harga Satuan Pekerjaan ( D + E ) 88,154.00

1 Buah Pemasangan Lampu Philips XL 23 Watt


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Listrik L.02 OH 0.080 110,000.00 8,800.00
3 Kepala Tukang L.03 OH 0.008 120,000.00 960.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,140.00
B BAHAN
1 Lampu Philips 23 Watt + Pitting Kg 1.000 75,000.00 75,000.00
JUMLAH HARGA BAHAN 75,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 90,140.00
E Overhead & Profit 10 % x D 9,014.00
F Harga Satuan Pekerjaan ( D + E ) 99,154.00

1 Buah Pemasangan Saklar Tunggal 200 Watt


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Listrik L.02 OH 0.080 110,000.00 8,800.00
3 Kepala Tukang L.03 OH 0.008 120,000.00 960.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,140.00
B BAHAN
1 Saklar Tunggal Kg 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 50,140.00
E Overhead & Profit 10 % x D 5,014.00
F Harga Satuan Pekerjaan ( D + E ) 55,154.00
1 Buah Pemasangan Saklar Ganda 200 Watt
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Listrik L.02 OH 0.080 110,000.00 8,800.00
3 Kepala Tukang L.03 OH 0.008 120,000.00 960.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,140.00
B BAHAN
1 Saklar Ganda Kg 1.000 45,000.00 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 60,140.00
E Overhead & Profit 10 % x D 6,014.00
F Harga Satuan Pekerjaan ( D + E ) 66,154.00

1 Buah Stop Kontak 200 Watt


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.050 105,000.00 5,250.00
2 Tukang Listrik L.02 OH 0.080 110,000.00 8,800.00
3 Kepala Tukang L.03 OH 0.008 120,000.00 960.00
4 Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,140.00
B BAHAN
1 Stop Kontak 200 Watt Kg 1.000 35,000.00 35,000.00
JUMLAH HARGA BAHAN 35,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 50,140.00
E Overhead & Profit 10 % x D 5,014.00
F Harga Satuan Pekerjaan ( D + E ) 55,154.00

1 Titik Pasang Titik Nyala Lampu Penerangan


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.300 105,000.00 31,500.00
2 Tukang Listrik L.02 OH 0.300 110,000.00 33,000.00
3 Kepala Tukang L.03 OH 0.030 120,000.00 3,600.00
4 Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 70,050.00
B BAHAN
1 Kabel NYM 2 x 1,5 mm dan Assesories Kg 8.000 15,000.00 120,000.00
JUMLAH HARGA BAHAN 120,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 190,050.00
E Overhead & Profit 10 % x D 19,005.00
F Harga Satuan Pekerjaan ( D + E ) 209,055.00
1 Buah Pemasangan Kloset Jongkok A.5.1.1.2
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 3.300 105,000.00 346,500.00
2 Tukang Batu L.02 OH 1.100 110,000.00 121,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 489,500.00
B BAHAN
1 Klosed Jongkok Unit 1.000 185,000.00 185,000.00
2 Semen Portland Kg 6.000 1,850.00 11,100.00
3 Pasir Pasang M3 0.010 235,000.00 2,350.00
JUMLAH HARGA BAHAN 198,450.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 687,950.00
E Overhead & Profit 10 % x D 68,795.00
F Harga Satuan Pekerjaan ( D + E ) 756,745.00

1 M' Pemasangan Pipa PVC Ø 4" A.5.1.1.32


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.081 105,000.00 8,505.00
2 Tukang L.02 OH 0.135 110,000.00 14,850.00
3 Kepala Tukang L.03 OH 0.014 120,000.00 1,620.00
4 Mandor L.04 OH 0.004 130,000.00 533.00
JUMLAH TENAGA KERJA 25,508.00
B BAHAN
1 Pipa PVC Ø 4" Unit 1.200 63,000.00 75,600.00
JUMLAH HARGA BAHAN 75,600.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 101,108.00
E Overhead & Profit 10 % x D 10,110.80
F Harga Satuan Pekerjaan ( D + E ) 111,218.80

1 M' Pemasangan Pipa GIP Ø 3/4" A.5.1.1.20


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.054 105,000.00 5,670.00
2 Tukang L.02 OH 0.090 110,000.00 9,900.00
3 Kepala Tukang L.03 OH 0.009 120,000.00 1,080.00
4 Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,160.00
B BAHAN
1 Pipa GIP Ø 3/4" Unit 1.200 32,000.00 38,400.00
2 Perlengkapan Ls 35% 11,200.00
JUMLAH HARGA BAHAN 49,600.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 69,760.00
E Overhead & Profit 10 % x D 6,976.00
F Harga Satuan Pekerjaan ( D + E ) 76,736.00
1 Buah Pemasangan Floordrain A.5.1.1.36
Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 13,900.00
B BAHAN
1 Floor Drain Unit 1.000 20,000.00 20,000.00
JUMLAH HARGA BAHAN 20,000.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 33,900.00
E Overhead & Profit 10 % x D 3,390.00
F Harga Satuan Pekerjaan ( D + E ) 37,290.00

1 Buah Pemasangan Kran Air 1/4 Putaran A.5.1.1.35


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA
1 Pekerja L.01 OH 0.010 105,000.00 1,050.00
2 Tukang L.02 OH 0.100 110,000.00 11,000.00
3 Kepala Tukang L.03 OH 0.010 120,000.00 1,200.00
4 Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 13,900.00
B BAHAN
1 Kran Air 1/4 Putaran Buah 1.000 85,000.00 85,000.00
2 Seal Tape Buah 0.025 12,000.00 5,100.00
JUMLAH HARGA BAHAN 90,100.00
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan ( A+B+C ) 104,000.00
E Overhead & Profit 10 % x D 10,400.00
F Harga Satuan Pekerjaan ( D + E ) 114,400.00

1 Unit Pembuatan Septictank A.5.1.1


Harga Jumlah
No. Uraian Kode Satuan Koefisien
Satuan (Rp) Harga (Rp)
A TENAGA

JUMLAH TENAGA KERJA


B BAHAN
1 Galian Tanah M3 7.900 90,200.00 712,580.00
2 Urugan Pasir dibawah lantai M3 0.150 346,280.00 51,942.00
3 Adukan Beton 1 : 3 : 5 M3 0.300 1,443,487.69 433,046.31
4 Beton camp. penutup septictank 1 : 2 : 3 M3 0.300 1,598,492.08 479,547.62
5 Besi Beton Ø 12 Kg 53.400 22,388.85 1,195,564.59
6 Pasangan Batu Tela 1 : 2 M2 13.175 172,851.25 2,277,315.22
7 Plesteran dinding 1 : 2 M2 9.300 82,900.84 770,977.81
8 Kerikil Koral M3 0.128 365,000.00 46,720.00
9 Sabuk kelapa/Ijuk Ls 1.000 250,000.00 250,000.00
10 Pipa Penguapan GIP dia 2 Ls 1.000 75,000.00 75,000.00
11 Buis beton bh 5.000 125,000.00 625,000.00
JUMLAH HARGA BAHAN 6,917,693.55
C PERALATAN

JUMLAH HARGA PERALATAN


D Jumlah Harga Tenaga, Bahan dan Peralatan, Termasuk Overhead & Profit ( A+B+C ) 6,917,693.55
DAFTAR HARGA SATUAN UPAH DAN BAHAN
Paket : REHABILITASI ASRAMA MAHASISWA STPP MANOKWARI
Lokasi : JL. SPMA REREMI - KABUPATEN MANOKWARI
Tahun : 2017

HARGA SATUAN
NO URAIAN KODE SATUAN
( Rp. )
1 2 3 4 5

I UPAH KERJA
1 Pekerja L.01 OH 105,000.00
2 Tukang Kayu L.02 OH 110,000.00
3 Tukang Batu L.02 OH 110,000.00
4 Tukang Besi L.02 OH 110,000.00
5 Tukang Cat L.02 OH 110,000.00
6 Tukang Las L.02 OH 110,000.00
7 Tukang Listrik L.02 OH 110,000.00
8 Kepala Tukang L.03 OH 120,000.00
9 Mandor L.04 OH 130,000.00
10 Stamper Jam 40,000.00

II BAHAN BANGUNAN
1 Batu Kali M3 290,000.00
2 Batu Tela/Batako Bh 2,500.00
3 Batu Terawang Uk. ( 20 x 20 ) cm Bh 5,000.00
4 Batu Alam Garis M2 248,000.00
5 Pasir Beton M3 273,000.00
6 Pasir Beton Kg 210.00
7 Pasir Pasang M3 235,000.00
8 Pasir Urug M3 235,000.00
9 Pasir Plester M3 235,000.00
10 Tanah Timbunan Biasa M3 180,000.00
11 Kerikil Cor M3 365,000.00
12 Kerikil Cor Kg 280.77
13 Kerikil Pecah/Cipping M3 489,000.00
14 Kerikil Pecah/Cipping Kg 376.15
15 Papan Kayu Besi M3 5,625,000.00
16 Balok Kayu Besi M3 5,300,000.00
17 Balok Kayu Matoa M3 3,400,000.00
18 Papan Kayu Matoa M3 3,550,000.00
19 Balok Kayu Putih M3 2,500,000.00
20 Papan Kayu Putih/Papan Begisting M3 2,500,000.00
21 Kayu Dolken / 4 m Batang 30,000.00
22 Besi Beton Ulir/Polos Kg 17,500.00
23 Kawat Ikat / Beton Kg 22,500.00
24 Paku Campuran Kg 20,000.00
25 Paku Zinc Galvalum ( Spandek ) Kg 80,000.00
26 Paku Tripleks Kg 30,000.00
27 Semen PC @ 50 Kg Kg 1,850.00
28 Minyak Bekisting Liter 23,000.00
29 Semen Warna (untuk Nat Keramik) Kg 15,700.00
30 Keramik Uk. ( 60 x 60 ) Bh 48,000.00
31 Keramik Lantai Uk. (40 x 40) cm Bh 18,500.00
32 Keramik Lantai Tekstur Kasar (40 x 40) cm Bh 20,000.00
33 Keramik Dinding (20 x 25) cm Bh 5,500.00
34 Keramik Lantai Anti Slip (20 x 20) cm Bh 4,500.00
35 Plint Keramik Uk. ( 10 x 60 ) cm Bh 12,000.00
36 Plin Keramik Artistik (5 x20 ) cm Bh 7,500.00
37 Batu Alam Bh 12,000.00
38 Lem Kayu Kg 22,500.00
39 Kaca Riben 5 mm M2 223,750.00
40 Tripleks 4 mm Lmbr 85,000.00
41 List Kayu Diprofil M' 9,000.00
HARGA SATUAN
NO URAIAN KODE SATUAN
( Rp. )
1 2 3 4 5

42 Kunci Tanam 2 Slaag kualitas baik Bh 250,000.00


43 Kunci Tanam 1 Slaag kualitas baik Bh 150,000.00
44 Engsel Pintu Ring Nylon 4" Bh 35,000.00
45 Engsel Jendela Ring Nylon 4" Bh 30,000.00
46 Hak Angin Lipat Bh 22,000.00
47 Spring Knip Bh 20,000.00
48 Expanyolet Pasang 250,000.00
49 Besi Strip Kg 15,000.00
50 Atap Zinc Galvalum ( Spandek ), Tebal 0,3 mm M' 85,000.00
51 Nok Atap Zinc Galvalum ( Spandek ), Tebal 0,3 mm Buah 100,000.00
52 Seng Plat BJLS 0,20 mm M2 20,000.00
53 Plamir Tembok Kg 10,000.00
54 Cat dasar Kg 20,000.00
55 Cat Tembok Ex. Al-Tex Naturtune Kg 30,000.00
56 Cat Plafond Kualitas Baik Kg 30,000.00
57 Plamir Kayu Kg 35,000.00
58 Meni kayu/besi Kg 35,000.00
59 Cat Kilap Kayu ICI Kg 55,000.00
60 Kuas Plat Bh 15,000.00
61 Kuas Roll Bh 20,000.00
62 Teak Oil Kg 70,000.00
63 Pengecer Kg 20,000.00
64 Amplas/kertas gosok Lbr 5,000.00
65 Lampu Philips XL 18 Watt + Pitting Set 65,000.00
66 Lampu Philips XL 23 Watt + Pitting Set 75,000.00
67 Down Light + PL 23 Watt Set 137,000.00
68 Kabel Listrik NYM 2 x 1,5 mm merk Eterna dan Assesories M' 15,000.00
69 Kabel Listrik NYM 2 x 2,5 mm merk Eterna dan Assesories M' 17,500.00
70 Saklar Tunggal Ex. Broco Bh 35,000.00
71 Saklar Ganda Ex. Broco Bh 45,000.00
72 Stop Kontak 200 watt Bh 35,000.00
73 Stop Kontak AC Bh 75,000.00
74 Pentanahan Ttk 350,000.00
75 Klosed Duduk Kwalitas Baik Bh 2,100,000.00
76 Klosed Jongkok Ex. INA Bh 185,000.00
77 Washtafel Porcelin Lengkap Dengan Kran + Cermin Bh 1,250,000.00
78 Floor Drain Bh 20,000.00
79 Floor Drain Atap Bh 75,000.00
80 Urinoir Bh 2,500,000.00
81 Pipa PVC diameter 6 " M' 170,000.00
82 Pipa PVC diameter 4 " M' 63,000.00
83 Pipa PVC diameter 3 " M' 50,000.00
84 Pipa PVC diameter 2 " M' 25,000.00
85 Pipa GIP diameter 1 " M' 40,000.00
86 Pipa GIP diameter 3/4 " M' 32,000.00
87 Pipa Listrik Union 5/8" M' 8,500.00
88 Assesories pipa GIP Set 25,000.00
89 Kran air 1/4 putaran Bh 85,000.00
90 Sheltip Pipa Bh 12,000.00
91 Lem Pipa PVC Kg 27,500.00
92 Mesin Pompa Air Unit 1,200,000.00
93 Gypsum Board Lembar 175,000.00
94 Besi Siku 50 . 50 . 5 M 50,000.00
95 Kawat Duri M' 10,000.00
NO NILAI TERBILANG
1 Rp 913,877,000.00 SEMBILAN RATUS TI 9 913 SEMBITIGA
2 RUPIAH 0
3 RUPIAH 0
4 RUPIAH 0
5 RUPIAH 0
6 RUPIAH 0
7 RUPIAH 0
8 RUPIAH 0
9 RUPIAH 0
10 RUPIAH 0
11 RUPIAH 0
12 RUPIAH 0
13 RUPIAH 0
14 RUPIAH 0
15 RUPIAH 0
16 RUPIAH 0
17 RUPIAH 0
18 RUPIAH 0
19 RUPIAH 0
20 RUPIAH 0

1 2 3 4 5 6 7 8
SATUDUA TIGA EMPALIMA ENAMTUJU DELA
SEBEDUA TIGA EMPALIMA ENAMTUJUHDELA
877 DELATUJU TUJU 000 SEMBISEMBIDELAP
DELAP

0
9 0
SEMBILAN 0
SEMBILAN BELAS

Anda mungkin juga menyukai