PEKERJAAN :
LOKASI :
TAHUN ANGGARAN : 2019
I PEKERJAAN PERSIAPAN
- PEKERJAAN PERSIAPAN Rp 28,216,154
II. PELAKSANAAN PEKERJAAN
A. PEKERJAAN PEMBONGKARAN Rp 19,969,878
B. PEKERJAAN PEMASANGAN LANTAI 1
1 AREA TUNGGU Rp 182,220,043
0 0 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
### Err:509 Err:509
D. PEMASANGAN SIGNAGE NAMA RUANG Rp -
### ### Err:509
E. PEMASANGAN KABEL LAN DAN TELEPON Rp -
G. PEMASANGAN JALUR INSTALASI AC Rp -
III PEKERJAAN PEMBERSIHAN DAN PERAPIHAN Rp 52,203,599
JUMLAH Err:509
PPN 10% Err:509
TOTAL Err:509
DIBULATKAN Err:509
Direktur
Mengetahui / Menyetujui :
RAB KSOP CIREBON
HARGA SATUAN
NO URAIAN PEKERJAAN/SPESIFIKASI TEKNIS VOLUME JUMLAH HARGA (Rp)
(Rp)
I. PEKERJAAN PERSIAPAN
Pekerjaan persiapan
- Pembuatan Papan Nama Proyek penyangga rangka kayu, media MMT 1.00 1.00 unit
- Pembuatan Gudang dan Peralatan 12.00 12.00 m² Rp 519,650.50 Rp 6,235,806.00
- Pembuatan Bedeng Pekerja 12.00 12.00 m² Rp 1,415,029.00 Rp 16,980,348.00
Biaya Penyelenggaraan Sistem Manajemen Keselamatan dan Kesehatan Kerja Konstruksi
- ( SMK3 ), Meliputi Penyiapan RK3K, Sosialisasi dan Promosi K3, Alat Pelindung Kerja dan 1.00 1.00 ls
Keamanan
- Pemindahan Perabot (peralatan kantor) Eksisting ke kantor sementara 1.00 1.00 ls Rp 5,000,000.00 Rp 5,000,000.00
- Dokumentasi Uk. 3R 5.00 5.00 set
Jumlah Rp 28,216,154.00
2 RUANG PPID
a. Pekerjaan Lantai
HARGA SATUAN
NO URAIAN PEKERJAAN/SPESIFIKASI TEKNIS VOLUME JUMLAH HARGA (Rp)
(Rp)
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.29 0.29 m³ Rp 1,092,298.96 Rp 315,892.86
- Pemasangan lantai granite tile 4.82 4.82 m² Rp 641,516.00 Rp 3,092,107.12
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 6.83 6.83 m² Rp 245,957.00 Rp 1,679,886.31
- Pemasangan plint granite tile 7.32 7.32 m¹ Rp 65,321.15 Rp 478,150.82
- Pemasangan wallpaper 23.95 23.95 m¹ Rp 171,905.45 Rp 4,117,479.34
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.82 4.82 m² Rp 206,385.90 Rp 994,780.04
- List plafond siku 9.12 9.12 m¹ Rp 65,321.15 Rp 595,728.89
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.82 4.82 m² Rp 40,991.52 Rp 197,579.13
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 1.00 1.00 titik Rp 1,685,463.00 Rp 1,685,463.00
f. Pekerjaan Pintu
Kusen dan Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm
- 1.00 1.00 unit Rp -
dengan sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp 13,157,067.50
3 RUANG LAKTASI
a. Pekerjaan Lantai
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.29 0.29 m³ Rp 1,092,298.96 Rp 314,582.10
- Pemasangan lantai granite tile 4.80 4.80 m² Rp 641,516.00 Rp 3,079,276.80
b. Pekerjaan Dinding
- Pemasangan plint granite tile 11.40 11.40 m¹ Rp 65,321.15 Rp 744,661.11
- Pemasangan wallpaper 34.53 34.53 m¹ Rp 171,905.45 Rp 5,935,895.19
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.80 4.80 m² Rp 206,385.90 Rp 990,652.32
- List plafond siku 12.30 12.30 m¹ Rp 65,321.15 Rp 803,450.15
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.80 4.80 m² Rp 40,991.52 Rp 196,759.30
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 1.00 1.00 titik Rp 1,685,463.00 Rp 1,685,463.00
f. Pekerjaan Pintu
Pintu dengan plat dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan door
- 1.00 1.00 unit Rp -
closer, lengkap dengan aksesoris (PA2)
g. Pekerjaan Blind
- Roller Blind, uk. 120 x 120 cm 1.69 1.69 m² Rp -
h. Pekerjaan Sanitary
- Wastafel dan kran 1.00 1.00 unit Rp -
i. Pekerjaan Pemipaan
- m¹ Rp -
- m¹ Rp -
Jumlah Rp 13,750,739.96
4 RUANG KONSULTASI
a. Pekerjaan Lantai
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.58 0.58 m³ Rp 1,092,298.96 Rp 635,718.00
- Pemasangan lantai granite tile 9.70 9.70 m² Rp 641,516.00 Rp 6,222,705.20
b. Pekerjaan Dinding
- Pemasangan plint granite tile 11.70 11.70 m¹ Rp 65,321.15 Rp 764,257.46
- Pemasangan wallpaper 35.14 35.14 m¹ Rp 171,905.45 Rp 6,041,548.28
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 9.70 9.70 m² Rp 206,385.90 Rp 2,001,943.23
- Pemasangan drop plafond tipe 1 8.90 8.90 m¹ Rp -
- List plafond siku 12.60 12.60 m¹ Rp 65,321.15 Rp 823,046.49
d. Pekerjaan Pengecatan
- Pengecatan plafond 9.70 9.70 m² Rp -
- Pengecatan drop plafond 8.90 8.90 m¹ Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 4.00 4.00 titik Rp 1,685,463.00 Rp 6,741,852.00
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 8.90 8.90 m¹ Rp 285,545.00 Rp 2,541,350.50
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
g. Pekerjaan Furniture
- 1.00 1.00 unit Rp -
- 1.00 1.00 unit Rp -
h. Pekerjaan Blind
- Roller Blind, uk. 134 x 131 cm 2.10 2.10 m² Rp -
Jumlah Rp 25,772,421.15
6 RUANG KAKEL
a. Pekerjaan Lantai
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.48 0.48 m³ Rp 1,092,298.96 Rp 524,303.50
- Pemasangan lantai granite tile 8.00 8.00 m² Rp 641,516.00 Rp 5,132,128.00
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 15.42 15.42 m² Rp 245,957.00 Rp 3,791,919.07
- Pemasangan plint granite tile 10.80 10.80 m¹ Rp 65,321.15 Rp 705,468.42
- Pemasangan wallpaper 34.11 34.11 m¹ Rp 171,905.45 Rp 5,863,694.90
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 8.00 8.00 m² Rp 206,385.90 Rp 1,651,087.20
- Pemasangan drop plafond tipe 1 3.20 3.20 m¹ Rp -
- List plafond siku 11.70 11.70 m¹ Rp 65,321.15 Rp 764,257.46
d. Pekerjaan Pengecatan
- Pengecatan plafond 8.00 8.00 m² Rp 40,991.52 Rp 327,932.16
- Pengecatan drop plafond 3.20 3.20 m¹ Rp 40,991.52 Rp 131,172.86
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 2.00 2.00 titik Rp 1,685,463.00 Rp 3,370,926.00
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 3.20 3.20 m¹ Rp 285,545.00 Rp 913,744.00
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp 23,176,633.57
7 BENDAHARA MATERIAL
a. Pekerjaan Lantai
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 0.98 0.98 m³ Rp 1,092,298.96 Rp 1,068,268.39
- Pemasangan lantai granite tile 16.30 16.30 m² Rp 641,516.00 Rp 10,456,710.80
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 12.41 12.41 m² Rp 245,957.00 Rp 3,052,326.37
- Pemasangan plint granite tile 16.93 16.93 m¹ Rp 65,321.15 Rp 1,105,887.07
- Pemasangan wallpaper 53.11 53.11 m¹ Rp 171,905.45 Rp 9,130,414.17
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 16.30 16.30 m² Rp 206,385.90 Rp 3,364,090.17
- Pemasangan drop plafond tipe 1 4.70 4.70 m¹ Rp -
- Pemasangan drop plafond tipe 2 7.28 7.28 m¹ Rp -
- List plafond siku 17.83 17.83 m¹ Rp 65,321.15 Rp 1,164,676.10
d. Pekerjaan Pengecatan
- Pengecatan plafond 16.30 16.30 m² Rp 40,991.52 Rp 668,161.78
- Pengecatan drop plafond 11.98 11.98 m¹ Rp 40,991.52 Rp 491,078.41
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 5.00 5.00 titik Rp 1,685,463.00 Rp 8,427,315.00
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 4.70 4.70 m¹ Rp 285,545.00 Rp 1,342,061.50
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp 40,270,989.75
8 GUDANG ARSIP
a. Pekerjaan Lantai
- Lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87 2.47 2.47 m³ Rp 1,092,298.96 Rp 2,693,609.24
- Pemasangan lantai granite tile 41.10 41.10 m² Rp 641,516.00 Rp 26,366,307.60
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 21.39 21.39 m² Rp 245,957.00 Rp 5,261,020.23
- Pemasangan plint granite tile 33.70 33.70 m¹ Rp 65,321.15 Rp 2,201,322.76
- Pemasangan wallpaper 105.10 105.10 m¹ Rp 171,905.45 Rp 18,067,262.80
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 41.10 41.10 m² Rp 206,385.90 Rp 8,482,460.49
- List plafond siku 34.60 34.60 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 41.10 41.10 m² Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 1.00 1.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu RM berikut instalasi 5.00 5.00 titik Rp -
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp 63,071,983.11
10 AREA TANGGA
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 12.54 12.54 m² Rp -
b. Pekerjaan Dinding
- Pemasangan railing tangga 11.32 11.32 m¹ Rp -
- Pemasangan plint granite tile 17.30 17.30 m¹ Rp -
- Pemasangan tanggulan bata untuk dudukan railing - - m¹ Rp -
Jumlah Rp -
1 BENDAHARA PENERIMAAN
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 13.20 13.20 m² Rp -
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 16.75 16.75 m² Rp -
- Pemasangan plint granite tile 16.00 16.00 m¹ Rp -
- Pemasangan wallpaper 50.23 50.23 m¹ Rp -
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 13.20 13.20 m² Rp -
- Pemasangan drop plafond tipe 1 4.90 4.90 m¹ Rp -
- Pemasangan drop plafond tipe 2 9.30 9.30 m¹ Rp -
- List plafond siku 16.90 16.90 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 13.20 13.20 m² Rp -
- Pengecatan drop plafond 14.20 14.20 m¹ Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 6.00 6.00 titik Rp -
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 4.90 4.90 m¹ Rp -
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp -
2 BENDAHARA PENGELUARAN
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 14.60 14.60 m² Rp -
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 13.03 13.03 m² Rp -
- Pemasangan plint granite tile 16.30 16.30 m¹ Rp -
- Pemasangan wallpaper 51.16 51.16 m¹ Rp -
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 14.60 14.60 m² Rp -
- Pemasangan drop plafond tipe 1 3.00 3.00 m¹ Rp -
- Pemasangan drop plafond tipe 2 12.60 12.60 m¹ Rp -
- List plafond siku 17.20 17.20 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 14.60 14.60 m² Rp -
- Pengecatan drop plafond 15.60 15.60 m¹ Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 6.00 6.00 titik Rp -
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 3.00 3.00 m¹ Rp -
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp -
HARGA SATUAN
NO URAIAN PEKERJAAN/SPESIFIKASI TEKNIS VOLUME JUMLAH HARGA (Rp)
(Rp)
3 RUANG TU
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 14.60 14.60 m² Rp -
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 sisi 8.23 8.23 m² Rp -
- Pemasangan plint granite tile 15.10 15.10 m¹ Rp -
- Pemasangan wallpaper 47.44 47.44 m¹ Rp -
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 14.60 14.60 m² Rp -
- Pemasangan drop plafond tipe 1 10.61 10.61 m¹ Rp -
- Pemasangan drop plafond tipe 2 6.80 6.80 m¹ Rp -
- List plafond siku 16.00 16.00 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 14.60 14.60 m² Rp -
- Pengecatan drop plafond 17.41 17.41 m¹ Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 2.00 2.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 4.00 4.00 titik Rp -
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 10.61 10.61 m¹ Rp -
f. Pekerjaan Pintu
Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm dengan
- 1.00 1.00 unit Rp -
sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Jumlah Rp -
4 FOYER
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 22.30 22.30 m² Rp -
b. Pekerjaan Dinding
- Pemasangan plint granite tile 17.85 17.85 m¹ Rp -
- Pemasangan wallpaper 63.26 63.26 m¹ Rp -
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 27.80 27.80 m² Rp -
- Pemasangan drop plafond tipe 1 12.30 12.30 m¹ Rp -
- Pemasangan drop plafond tipe 2 13.30 13.30 m¹ Rp -
- List plafond siku 21.90 21.90 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 27.80 27.80 m² Rp -
- Pengecatan drop plafond 25.60 25.60 m¹ Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 1.00 1.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 6.00 6.00 titik Rp -
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 12.30 12.30 m¹ Rp -
Jumlah Rp -
6 RUANG RAPAT
a. Pekerjaan Lantai
- Pemasangan lantai karpet tile berikut underlayer 76.20 76.20 m² Rp -
b. Pekerjaan Dinding
- Pemasangan ring balok 0.59 0.59 m³ Rp -
- Pemasangan kolom praktis 0.50 0.50 m³ Rp -
- Pemasangan sloof 0.59 0.59 m³ Rp -
- Pemasangan dinding bata 60.14 60.14 m² Rp -
- Acian 120.28 120.28 m² Rp -
- Plesteran 120.28 120.28 m² Rp -
- Pemasangan partisi gypsum rangka hollow 2 sisi 22.98 22.98 m² Rp -
- Pemasangan plint kayu fin. Melamic 38.80 38.80 m¹ Rp -
HARGA SATUAN
NO URAIAN PEKERJAAN/SPESIFIKASI TEKNIS VOLUME JUMLAH HARGA (Rp)
(Rp)
- Pemasangan wallpaper 116.40 116.40 m¹ Rp -
- Pemasangan bukaan jendela 6.24 6.24 m¹ Rp -
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 76.20 76.20 m² Rp -
- Pemasangan/penggantian plafond, bahan triplek finishing HPL dengan list stainless 12.00 12.00 m² Rp -
- Pemasangan drop plafond tipe 1 79.40 79.40 m¹ Rp -
- Pemasangan drop plafond tipe 2 117.60 117.60 m¹ Rp -
- Pemasangan drop plafond tipe 5 4.46 4.46 m¹ Rp -
- List plafond siku minimalis 4.56 4.56 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 64.20 64.20 m² Rp -
- Pengecatan drop plafond 201.46 201.46 m² Rp -
e. Pekerjaan Mekanikal Elektrikal
- Stop kontak tanam dinding berikut instalasi 3.00 3.00 titik Rp -
- Stop kontak tanam lantai berikut instalasi 6.00 6.00 titik Rp -
- Instalasi kabel TV 1.00 1.00 titik Rp -
- Instalasi suplai elektrikal 10.00 10.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 17.00 17.00 titik Rp -
- Pemasangan lampu, fitting, lampu indirect LED berikut instalasi 79.40 79.40 m¹ Rp -
- Pemasangan titik lampu, fitting, lampu spotlight LED berikut instalasi 5.00 5.00 titik Rp -
f. Pekerjaan Pintu
Pintu kaca temperred frameless 2 daun pintu, uk. 180 x 240 cm, dengan sticker sandblast
- 1.00 1.00 unit Rp -
cutting laser, lengkap dengan aksesoris (PK2)
Partisi kaca temperred frameless, uk. 90 x 240 cm, dengan sticker sandblast lengkap
- 2.00 2.00 unit
dengan aksesoris (K1)
Jendela kaca dengan frame dan kusen aluminium, uk. 222,5 x 140 cm dengan kaca film,
- 2.00 2.00 unit Rp -
lengkap dengan aksesoris (JA2)
- Gawangan kayu ruang rapat, marmer import Italy kombinasi kayu (WT4) 1.00 1.00 unit
g. Pekerjaan Furniture
- 1.00 1.00 unit Rp -
- 1.00 1.00 unit Rp -
h. Pekerjaan Blind
- Roller Blind, uk. 222,5 x 140 cm (2 unit) 6.60 6.60 m² Rp -
Jumlah Rp -
8 TOILET LANTAI 2
a. Pekerjaan Lantai
- Pemasangan lantai granite tile 4.60 4.60 m² Rp -
b. Pekerjaan Dinding
- Pemasangan ring balok 0.04 0.04 m³ Rp -
- Pemasangan kolom praktis 0.08 0.08 m³ Rp -
- Pemasangan sloof 0.02 0.02 m³ Rp -
- Pemasangan dinding bata 2.94 2.94 m² Rp -
- Acian 5.88 5.88 m² Rp -
- Plesteran 5.88 5.88 m² Rp -
- Pemasangan keramik dinding, uk. 30 x 60 cm 25.08 25.08 m² Rp -
- Pemasangan bukaan pintu 5.60 5.60 m¹ Rp -
HARGA SATUAN
NO URAIAN PEKERJAAN/SPESIFIKASI TEKNIS VOLUME JUMLAH HARGA (Rp)
(Rp)
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.60 4.60 m² Rp -
- List plafond siku 9.00 9.00 m¹ Rp -
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.60 4.60 m² Rp -
e. Pekerjaan Mekanikal Elektrikal
- Pemasangan titik lampu, fitting, lampu downlight LED berikut instalasi 1.00 1.00 titik Rp -
- Pemasangan titik lampu, fitting, lampu spotlight LED berikut instalasi 1.00 1.00 titik Rp -
- Pemasangan exhaust ceiling fan 1.00 1.00 titik Rp -
f. Pekerjaan Pintu
Pintu kayu fin. HPL dengan kusen kayu solid 1 daun pintu, uk. 80 x 240 cm dengan door
- 1.00 1.00 unit Rp -
closer, lengkap dengan aksesoris (PKY1)
Jendela bouven leigh dengan kusen aluminium, uk. 40 x 50 cm, dengan sticker sandblast,
- 1.00 1.00 unit Rp -
lengkap dengan aksesoris (BV1)
g. Pekerjaan Furniture
- Pemasangan meja beton 0.66 0.66 m² Rp -
- Finishing granite tile untuk meja wastafel 0.16 0.16 m² Rp -
- Cermin bevel uk. 65 x 105 cm 1.00 1.00 unit Rp -
- Ban penutup pipa wastafel toilet lantai 2 (FT2) 1.00 1.00 unit Rp -
h. Pekerjaan Sanitary
- Wastafel merk TOTO tipe LW647CJ 1.00 1.00 unit Rp -
- Kran merk TOTO tipe TX115LRS 1.00 1.00 unit Rp -
- Closet duduk 1.00 1.00 unit Rp -
- Jet shower 1.00 1.00 unit Rp -
- Floor drain 1.00 1.00 unit Rp -
- Tissue dispenser 1.00 1.00 unit Rp -
- Tissue holder 1.00 1.00 unit Rp -
i. Pekerjaan Pemipaan
- m¹ Rp -
- m¹ Rp -
- m¹ Rp -
- m¹ Rp -
Jumlah Rp -
Jumlah Rp -
F. PEMASANGAN SPEAKER
1 Instalasi ceiling speaker titik Rp -
2 titik Rp -
Jumlah Rp -
G. PEMASANGAN JALUR INSTALASI AC
Jumlah Rp -
Konsultan Perenaca
Direktur
HARGA SATUAN PEKERJAAN
No Kode Jenis Pekerjaan Harga
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
1 A.2.2.1.1. (K3) Pembuatan 1 m2 pagar sementara dari kayu tinggi 2 meter Rp 119,533
2 A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter Rp 121,623
3 A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter Rp 153,673
1 A.2.2.1.4. Pengukuran dan pemasangan 1 m’ Bouwplank Rp 49,727
2 A.2.2.1.5. (K3) Pembuatan 1 m2 kantor sementara lantai plesteran Rp 1,011,987
3 A.2.2.1.6. (K3) Pembuatan 1 m2 rumah jaga (konstruksi kayu ) Rp 511,579
4 A.2.2.1.7. (K3) Pembuatan 1 m2 gudang semen dan peralatan Rp 617,952
2 A.2.2.1.8. (K3) Pembuatan 1 m2 bedeng pekerja Rp 1,144,341
3 A.2.2.1.9. (K3) Pembersihan 1 m2 lapangan dan perataan Rp 29,299
4 A.2.2.1.10. (K3) Pembuatan 1 m2 steger/perancah dari bambu Rp 617,952
5 A.2.2.1.11. Pembuatan 1 buah kotak adukan ukuran 40cm x50cm x25cm Rp 63,823
6 A.2.2.1.12. Pembuatan 1 m2 jalan sementara Rp 182,406
4 A.2.2.1.13. Pembongkaran 1 m3 beton bertulang Rp 1,417,820
5 A.2.2.1.14. Pembongkaran 1 m3 dinding tembok bata Rp 1,283,053
6 A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm Rp 18,184
7 A.2.2.1.16. Pemasangan 1 m2 panel beton pracetak 5x50x240 cm Rp 98,716
A.2.2.1.(1) Pengoperasian per-jam pompa air Rp 137,805
A.2.2.1.14.(1) Pembongkaran 1 m2 pagar BRC Rp 213,842
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
6 A.2.3.1.1. Penggalian 1 m3 tanah biasa sedalam 1 m Rp 141,552
7 A.2.3.1.2. Penggalian 1 m3 tanah biasa sedalam 2 m Rp 173,214
8 A.2.3.1.3. Menggali 1 m3 tanah biasa sedalam 3 m Rp 205,322
9 A.2.3.1.4. Menggali 1 m3 tanah keras sedalam 1 m Rp 188,438
10 A.2.3.1.5. Menggali 1 m3 tanah cadas sedalam 1 m Rp 285,339
11 A.2.3.1.6. Menggali 1 m3 tanah lumpur sedalam 1 m Rp 227,601
12 A.2.3.1.7. Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Rp 10,181
13 A.2.3.1.8. (K3) Pembuangan 1 m3 tanah sejauh 30 meter Rp 62,059
14 A.2.3.1.9. Pengurugan kembali 1 m3 galian tanah (1/3 Galian;-Tanah Biasa Sedalam 1 M) Rp 50,907
15 A.2.3.1.10. (K3) Pemadatan tanah 1 m3 tanah ( per 20 cm) Rp 101,815
7 A.2.3.1.11. Pengurugan 1 m3 dengan pasir urug Rp 376,780
8 A.2.3.1.12. Pemasangan 1 m3 lapisan pudel campuran 1KP:3PP:7TL Rp 248,003
9 A.2.3.1.13. Pemasangan 1 m2 lapisan ijuk tebal 10 cm untuk bidang resapan Rp 30,544
8 A.2.3.1.14. Pengurugan 1 m3 sirtu padat Rp 395,907
A.2.3.1.14.(1) Per-m' pengeboran lubang tiang pancang beton ø 30 cm / kotak 30 x 30 secara manual Rp 95,914
A.3.2.2 HARGA SATUAN PEKERJAAN PONDASI
31 A.3.2.1.1. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 3PP Rp 448,249
32 A.3.2.1.2. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 4PP Rp 448,249
33 A.3.2.1.3. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 5PP Rp 448,249
34 A.3.2.1.4. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 6PP Rp 448,249
35 A.3.2.1.5. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 8PP Rp 448,249
36 A.3.2.1.6. Pemasangan 1 m3 pondasi batu belah campuran 1SP : 1KP : 2PP Rp 448,249
37 A.3.2.1.7. Pemasangan 1 m3 pondasi batu belah campuran 1 SP : 3 KP : 10 PP Rp 448,249
38 A.3.2.1.8. Pemasangan 1 m3 pondasi batu belah campuran ¼ SP : 1 KP : 4PP Rp 448,249
39 A.3.2.1.9. Pemasangan 1 m3 batu kosong (anstamping) Rp 233,089
40 A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah Rp 835,198
41 A.3.2.1.11. Pemasangan 1 m3 pondasi sumuran, diameter 100 cm Rp 631,877
A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA Rp - Rp -
Pekerja L.01.01 OH 0.2000 Rp 157,643 Rp 31,529
Tukang Kayu L.02.04 OH 0.4000 Rp 166,729 Rp 66,692
Kepala Tukang L.03.01 OH 0.0200 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.0200 Rp 194,274 Rp 3,885
JUMLAH TENAGA KERJA Rp 105,759
B BAHAN
Dolken kayu Ø 8-10/400 cm Batang 1.2500 Rp -
Semen portland Kg 2.5000 Rp -
Seng gelombang Lbr 1.2000 Rp -
Pasir beton m3 0.0050 Rp -
Koral beton m3 0.0090 Rp -
Kayu 5/7 m3 0.0720 Rp -
Paku biasa Kg 0.0600 Rp -
Meni besi Liter 0.4500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp 105,759
E Overhead & Profit 15% 15% Rp 15,864
F Harga Satuan Pekerjaan (D+E) Rp - Rp 121,623
A.2.2.1.3. Pembuatan 1 m2 pagar sementara dari kawat duri tinggi 1,8 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA Rp - Rp -
Pekerja L.01.01 OH 0.2000 Rp 157,643 Rp 31,529
Tukang Kayu L.02.04 OH 0.3000 Rp 166,729 Rp 50,019
Kepala Tukang L.03.01 OH 0.0200 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.0200 Rp 194,274 Rp 3,885
JUMLAH TENAGA KERJA Rp 89,086
B BAHAN Rp - Rp -
Dolken kayu Ø 8-10/400 cm Batang 1.0000 Rp -
Semen portland Kg 2.0000 Rp -
Kawat duri M’ 25.0000 Rp -
Pasir beton m3 0.0050 Rp -
Koral beton m3 0.0090 Rp -
Paku biasa 2” - 5” Kg 0.0600 Rp -
JUMLAH HARGA BAHAN Rp 89,086
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 133,629
E Overhead & Profit 15% 15% Rp 20,044
F Harga Satuan Pekerjaan (D+E) Rp - Rp 153,673
P.01.e.2) Bongkar 1 m3 pasangan batu (manual) Sumber AHSP Sumber Daya Air Basis Permen 28 tahun 2016
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 1.2000 Rp 157,643 Rp 189,172
Mandor L.04 OH 0.0000 Rp 194,274 Rp -
JUMLAH TENAGA KERJA Rp 189,172
B BAHAN
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Palu/godam (baja keras) To.16 buah 0.0060 Rp 30,000 Rp 180
Pahat beton (baja keras) To.15 buah 0.0090 Rp 20,000 Rp 180
Linggis (baja keras) To.14 buah 0.0200 Rp 45,000 Rp 900
JUMLAH HARGA ALAT Rp 1,260
D Jumlah (A+B+C) Rp 190,432
E Overhead & Profit 15% 15% Rp 28,565
F Harga Satuan Pekerjaan (D+E) Rp - Rp 218,996
*) Jika tidak perlu menggunakan peralatan khusus (baja keras), maka HSD = 0
**) Hasil pembersihan 1m3 pasangan batu yang dibongkar, umumnya menghasilkan 0,55 - 0,65 m3 batu
A.2.3.1.14.(1) Per-m' pengeboran lubang tiang pancang beton ø 30 cm / kotak 30 x 30 secara manual
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.2548 Rp 157,643 Rp 40,167
Tukang L.02 OH 0.0637 Rp 166,729 Rp 10,621
Mandor L.04 OH 0.0255 Rp 194,274 Rp 4,954
JUMLAH TENAGA KERJA Rp 55,742
B BAHAN
Jumlah Harga Rp -
C PERALATAN
Hammer pile manual 1 ton E.01.b Sewa-hari 0.0637 Rp 129,000 Rp 8,217
Sewa Truk (pembuangan lumpur hasil E.44b Sewa-hari 0.02777778 Rp 700,000 Rp 19,444
pengeboran)
JUMLAH HARGA ALAT Rp 27,662
D Jumlah (A+B+C) Rp 83,404
E Overhead & Profit 15% 15% Rp 12,511
F Harga Satuan Pekerjaan (D+E) Rp - Rp 95,914
A.2.2.1.15. Pemasangan 1 m2 pagar kawat jaring galvanis panjang 240 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0420 Rp 157,643 Rp 6,621
Tukang L.02.01 OH 0.0040 Rp 166,729 Rp 667
Kepala Tukang L.03.01 OH 0.0020 Rp 182,676 Rp 365
Mandor L.04.01 OH 0.0420 Rp 194,274 Rp 8,160
JUMLAH TENAGA KERJA Rp 15,813
B BAHAN Rp - Rp -
Kawat jaring Lbr 0.1434 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 15,813
E Overhead & Profit 15% 15% Rp 2,372
F Harga Satuan Pekerjaan (D+E) Rp - Rp 18,184
D.04 Pengoperasian per-jam pompa air diesel daya 5 kW dengan suction head maks. 3 m dan discharge head
maks. 20 m (kapasitas 0,5 m3/s pada suction head 1 m dan discharge head 10 m).
Harga Satuan
No Uraian Kode Satuan Koefisien Jumlah Harga (Rp.)
(Rp.)
A TENAGA
Pekerja L.01 OH 0.125 Rp 157,643 Rp 19,705
Operator Pompa L.05 OH 0.125 Rp 130,000 Rp 16,250
Mandor L.04 OH 0.013 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 38,481
B BAHAN
Solar M.137.b Liter 3.500 Rp 10,600 Rp 37,100
Jumlah Harga Rp 37,100
C PERALATAN
Pompa air diesel 5 KW E.34.b Sewa-jam 0.15 Rp 295,000 Rp 44,250
JUMLAH HARGA ALAT Rp 44,250
D Jumlah (A+B+C) Rp 119,831
E Overhead & Profit 15% 15% Rp 17,975
F Harga Satuan Pekerjaan (D+E) Rp - Rp 137,805
A.3.2.1.10. (K3) Pemasangan 1 m3 pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4000 Rp 157,643 Rp 535,986
Tukang Batu L.02.03 OH 0.8500 Rp 166,729 Rp 141,720
Kepala Tukang L.03.01 OH 0.0850 Rp 182,676 Rp 15,527
Mandor L.04.01 OH 0.1700 Rp 194,274 Rp 33,027
JUMLAH TENAGA KERJA Rp 726,260
B BAHAN
Batu belah m3 0.4800 Rp -
Semen portland Kg 194.0000 Rp -
Pasir Beton m3 0.3120 Rp -
Kerikil m3 0.4680 Rp -
Besi beton (polos/ulir) Kg 126.0000 Rp -
Kawat beton Kg 1.8000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 726,260
E Overhead & Profit 15% 15% Rp 108,939
F Harga Satuan Pekerjaan (D+E) Rp - Rp 835,198
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.2000 Rp 157,643 Rp 189,172
Tukang Batu L.02.03 OH 0.2000 Rp 166,729 Rp 33,346
Kepala Tukang L.03.01 OH 0.0200 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.0600 Rp 194,274 Rp 11,656
JUMLAH TENAGA KERJA Rp 237,827
B BAHAN
Semen portland kg 120.0000 Rp 1,500 Rp 180,000
Pasir Beton kg 893.0000 Rp 145 Rp 129,485
Kerikil (Maks 30 mm) kg 1027.0000 Rp 159 Rp 162,894
Air Liter 200.0000 Rp 1,100 Rp 220,000
JUMLAH HARGA BAHAN Rp 692,379
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 930,206
E Overhead & Profit 15% 15% Rp 139,531
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,069,736
A.4.1.1.5. Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 326.0000 Rp -
Pasir Beton kg 760.0000 Rp -
Kerikil (Maks 30 mm) kg 1029.0000 Rp -
Air Liter 215.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 327,201
E Overhead & Profit 15% 15% Rp 49,080
F Harga Satuan Pekerjaan (D+E) Rp - Rp 376,281
A.4.1.1.6 Membuat 1 m3 beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 352.0000 Rp 1,500 Rp 528,000
Pasir Beton kg 731.0000 Rp 145 Rp 105,995
Kerikil (Maks 30 mm) kg 1031.0000 Rp 159 Rp 163,528
Air Liter 215.0000 Rp 1,100 Rp 236,500
JUMLAH HARGA BAHAN Rp 1,034,023
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,361,224
E Overhead & Profit 15% 15% Rp 204,184
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,565,407
A.4.1.1.7. Membuat 1 m3 beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 371.0000 Rp 1,500 Rp 556,500
Pasir Beton kg 698.0000 Rp 145 Rp 101,210
Kerikil (Maks 30 mm) kg 1047.0000 Rp 159 Rp 166,066
Air Liter 215.0000 Rp 1,100 Rp 236,500
JUMLAH HARGA BAHAN Rp 1,060,276
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,387,477
E Overhead & Profit 15% 15% Rp 208,122
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,595,598
A.4.1.1.8. Membuat 1 m3 beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 384.0000 Rp 1,500 Rp 576,000
Pasir Beton kg 692.0000 Rp 145 Rp 100,340
Kerikil (Maks 30 mm) kg 1039.0000 Rp 159 Rp 164,797
Air Liter 215.0000 Rp 1,100 Rp 236,500
JUMLAH HARGA BAHAN Rp 1,077,637
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,404,838
E Overhead & Profit 15% 15% Rp 210,726
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,615,563
A.4.1.1.9. Membuat 1 m3 beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 406.0000 Rp -
Pasir Beton kg 684.0000 Rp -
Kerikil (Maks 30 mm) kg 1026.0000 Rp -
Air Liter 215.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 327,201
E Overhead & Profit 15% 15% Rp 49,080
F Harga Satuan Pekerjaan (D+E) Rp - Rp 376,281
A.4.1.1.10. Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6500 Rp 157,643 Rp 260,111
Tukang Batu L.02.03 OH 0.2750 Rp 166,729 Rp 45,850
Kepala Tukang L.03.01 OH 0.0280 Rp 182,676 Rp 5,115
Mandor L.04.01 OH 0.0830 Rp 194,274 Rp 16,125
JUMLAH TENAGA KERJA Rp 327,201
B BAHAN
Semen portland kg 413.0000 Rp -
Pasir Beton kg 681.0000 Rp -
Kerikil (Maks 30 mm) kg 1021.0000 Rp -
Air Liter 215.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 327,201
E Overhead & Profit 15% 15% Rp 49,080
F Harga Satuan Pekerjaan (D+E) Rp - Rp 376,281
A.4.1.1.11. Membuat 1 m3 beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 Rp 157,643 Rp 331,050
Tukang Batu L.02.03 OH 0.3500 Rp 166,729 Rp 58,355
Kepala Tukang L.03.01 OH 0.0350 Rp 182,676 Rp 6,394
Mandor L.04.01 OH 0.1050 Rp 194,274 Rp 20,399
JUMLAH TENAGA KERJA Rp 416,198
B BAHAN
Semen portland kg 439.0000 Rp -
Pasir Beton kg 670.0000 Rp -
Kerikil (Maks 30 mm) kg 1006.0000 Rp -
Air Liter 215.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 416,198
E Overhead & Profit 15% 15% Rp 62,430
F Harga Satuan Pekerjaan (D+E) Rp - Rp 478,627
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.1000 Rp 157,643 Rp 331,050
Tukang Batu L.02.03 OH 0.3500 Rp 166,729 Rp 58,355
Kepala Tukang L.03.01 OH 0.0350 Rp 182,676 Rp 6,394
Mandor L.04.01 OH 0.1050 Rp 194,274 Rp 20,399
JUMLAH TENAGA KERJA Rp 416,198
B BAHAN
Semen portland kg 448.0000 Rp -
Pasir Beton kg 667.0000 Rp -
Kerikil (Maks 30 mm) kg 1000.0000 Rp -
Air Liter 215.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 416,198
E Overhead & Profit 15% 15% Rp 62,430
F Harga Satuan Pekerjaan (D+E) Rp - Rp 478,627
Untuk pekerjaan beton pracetak yang bisa diangkat 24 jam diperlukan penambahan bahan tambahan sesuai Tabel berikut:
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.1.2.2. (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1650 Rp 157,643 Rp 26,011
Tukang batu L.02.03 OH 0.0280 Rp 166,729 Rp 4,668
Kepala tukang L.03.01 OH 0.0030 Rp 182,676 Rp 548
Mandor L.04.01 OH 0.0080 Rp 194,274 Rp 1,554
JUMLAH TENAGA KERJA Rp 32,782
B BAHAN
Semen portland Kg 32.6000 Rp -
Pasir beton Kg 76.0000 Rp -
Kerikil (Maks 30 mm) Kg 102.9000 Rp -
Air L 21.5000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 32,782
E Overhead & Profit 15% 15% Rp 4,917
F Harga Satuan Pekerjaan (D+E) Rp - Rp 37,698
A.4.1.2.3. (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1980 Rp 157,643 Rp 31,213
Tukang batu L.02.03 OH 0.0330 Rp 166,729 Rp 5,502
Kepala tukang L.03.01 OH 0.0030 Rp 182,676 Rp 548
Mandor L.04.01 OH 0.0100 Rp 194,274 Rp 1,943
JUMLAH TENAGA KERJA Rp 39,206
B BAHAN
Semen portland Kg 32.1200 Rp -
Pasir beton Kg 91.2000 Rp -
Kerikil (Maks 30 mm) Kg 123.4800 Rp -
Air L 25.8000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 39,206
E Overhead & Profit 15% 15% Rp 5,881
F Harga Satuan Pekerjaan (D+E) Rp - Rp 45,087
A.4.1.2.4. (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2480 Rp 157,643 Rp 39,095
Tukang batu L.02.03 OH 0.0410 Rp 166,729 Rp 6,836
Kepala tukang L.03.01 OH 0.0040 Rp 182,676 Rp 731
Mandor L.04.01 OH 0.0130 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 49,188
B BAHAN
Semen portland Kg 48.9000 Rp -
Pasir beton Kg 114.0000 Rp -
Kerikil (Maks 30 mm) Kg 154.3500 Rp -
Air L 32.2500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 49,188
E Overhead & Profit 15% 15% Rp 7,378
F Harga Satuan Pekerjaan (D+E) Rp - Rp 56,565
A.4.1.2.6. Pembuatan 1 m2 bekisting untuk balok beton pracetak ( 10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 Rp 157,643 Rp 631
Tukang batu L.02.03 OH 0.0380 Rp 166,729 Rp 6,336
Kepala tukang L.03.01 OH 0.0040 Rp 182,676 Rp 731
Mandor L.04.01 OH 0.0010 Rp 194,274 Rp 194
JUMLAH TENAGA KERJA Rp 7,891
B BAHAN
Kayu kaso 5/7 m3 0.0050 Rp -
Phenol film 12mm Lbr 0.0430 Rp -
Minyak bekisting L 0.2000 Rp -
Dynabol dia 12 x 120 mm Bh 0.6930 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 7,891
E Overhead & Profit 15% 15% Rp 1,184
F Harga Satuan Pekerjaan (D+E) Rp - Rp 9,074
A.4.1.2.7. Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0040 Rp 157,643 Rp 631
Tukang batu L.02.03 OH 0.0380 Rp 166,729 Rp 6,336
Kepala tukang L.03.01 OH 0.0040 Rp 182,676 Rp 731
Mandor L.04.01 OH 0.0010 Rp 194,274 Rp 194
JUMLAH TENAGA KERJA Rp 7,891
B BAHAN
Kayu kaso 5/7 m3 0.0040 Rp -
Phenol film 12mm Lbr 0.0480 Rp -
Minyak bekisting L 0.2000 Rp -
Paku Biasa Kg 0.0460 Rp -
Dynabol dia 12 x 120 mm Bh 0.6930 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 7,891
E Overhead & Profit 15% 15% Rp 1,184
F Harga Satuan Pekerjaan (D+E) Rp - Rp 9,074
A.4.1.2.8. Pemasangan dan membuka bekisting 1 buah komponen plat beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0530 Rp 157,643 Rp 8,355
Tukang kayu L.02.04 OH 0.0180 Rp 166,729 Rp 3,001
Mandor L.04.01 OH 0.0050 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 12,328
B BAHAN
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 12,328
E Overhead & Profit 15% 15% Rp 1,849
F Harga Satuan Pekerjaan (D+E) Rp - Rp 14,176
A.4.1.2.9. Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0890 Rp 157,643 Rp 14,030
Tukang kayu L.02.04 OH 0.0300 Rp 166,729 Rp 5,002
Mandor L.04.01 OH 0.0050 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 20,003
B BAHAN
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 20,003
E Overhead & Profit 15% 15% Rp 3,001
F Harga Satuan Pekerjaan (D+E) Rp - Rp 23,003
A.4.1.2.10. Pemasangan dan membuka bekisting 1 buah komponen Kolom beton pracetak
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.0710 Rp 157,643 Rp 11,193
Tukang kayu L.02.04 OH 0.0240 Rp 166,729 Rp 4,001
Mandor L.04.01 OH 0.0050 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 16,166
B BAHAN
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 16,166
E Overhead & Profit 15% 15% Rp 2,425
F Harga Satuan Pekerjaan (D+E) Rp - Rp 18,590
A.4.2.1.4. Pembuatan 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0500 Rp 157,643 Rp 165,525
Tukang Las L.02.11 OH 1.0500 Rp 166,729 Rp 175,065
Kepala tukang L.03.01 OH 0.1050 Rp 182,676 Rp 19,181
Mandor L.04.01 OH 0.0520 Rp 194,274 Rp 10,102
JUMLAH TENAGA KERJA Rp 369,874
B BAHAN
Besi siku L 30.30.3 Kg 15.0000 Rp -
Besi plat baja Kg 32.8000 Rp -
Kawat las Kg 0.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 369,874
E Overhead & Profit 15% 15% Rp 55,481
F Harga Satuan Pekerjaan (D+E) Rp - Rp 425,354
A.4.2.1.19 Pemasangan 1 m talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1500 Rp 157,643 Rp 23,646
Tukang L.02.01 OH 0.3000 Rp 166,729 Rp 50,019
Kepala tukang L.03.01 OH 0.0300 Rp 182,676 Rp 5,480
Mandor L.04.01 OH 0.0080 Rp 194,274 Rp 1,554
JUMLAH TENAGA KERJA Rp 80,700
B BAHAN
Seng plat m 1.0500 Rp -
Paku Biasa kg 0.0100 Rp -
Besi strip kg 0.5000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 80,700
E Overhead & Profit 15% 15% Rp 12,105
F Harga Satuan Pekerjaan (D+E) Rp - Rp 92,804
A.4.2.1.20. Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 Rp 157,643 Rp 39,411
Tukang Besi L.02.05 OH 0.2500 Rp 166,729 Rp 41,682
Kepala Tukang L.03.01 OH 0.0250 Rp 182,676 Rp 4,567
Mandor L.04.01 OH 0.0130 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 88,185
B BAHAN
Rangka metal hollow 40.40.2 mm M1 3.5000 Rp 25,000 Rp 87,500
Assesoris (perkuatan, las dll) Ls 1.0000 Rp 200,000 Rp 200,000
JUMLAH HARGA BAHAN Rp 287,500
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 375,685
E Overhead & Profit 15% 15% Rp 56,353
F Harga Satuan Pekerjaan (D+E) Rp - Rp 432,038
A.4.2.1.22. (K3) Pemasangan 1 m2 atap pelana rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7604 Rp 157,643 Rp 119,872
Tukang Besi L.02.05 OH 0.7604 Rp 166,729 Rp 126,781
Kepala Tukang L.03.01 OH 0.0760 Rp 182,676 Rp 13,883
Mandor L.04.01 OH 0.0380 Rp 194,274 Rp 7,382
JUMLAH TENAGA KERJA Rp 267,918
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
Alat Rangka Atap Baja Canai Dingin 0.1000 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 267,918
E Overhead & Profit 15% 15% Rp 40,188
F Harga Satuan Pekerjaan (D+E) Rp - Rp 308,105
A.4.2.1.23. (K3) Pemasangan 1 m2 atap jurai rangka atap baja canai dingin profil C75
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7340 Rp 157,643 Rp 115,710
Tukang Besi L.02.05 OH 0.7340 Rp 166,729 Rp 122,379
Kepala Tukang L.03.01 OH 0.0730 Rp 182,676 Rp 13,335
Mandor L.04.01 OH 0.0370 Rp 194,274 Rp 7,188
JUMLAH TENAGA KERJA Rp 258,613
B BAHAN
Baja ringan canai dingin C75 kg 4.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 258,613
E Overhead & Profit 15% 15% Rp 38,792
F Harga Satuan Pekerjaan (D+E) Rp - Rp 297,404
A.4.2.1.24. Pemasangan 1 M2 PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2000 Rp 157,643 Rp 31,529
Tukang Besi L.02.05 OH 0.4500 Rp 166,729 Rp 75,028
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0500 Rp 194,274 Rp 9,714
JUMLAH TENAGA KERJA Rp 118,097
B BAHAN
Baja ringan canai dingin C75 M' 3.7200 Rp -
Baut (Srew driver) bh 28.0000 Rp -
Dynabol dia 12 x 120 mm bh 2.0000 Rp -
Reng Canai Dingin M' 5.4000 Rp -
Talang / Jurai Canai Dingin M' 0.1240 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Alat Rangka Atap Baja Canai Dingin 0.1000 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 118,097
E Overhead & Profit 15% 15% Rp 17,715
F Harga Satuan Pekerjaan (D+E) Rp - Rp 135,811
A.4.4.1.2. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 Rp -
Tukang Batu L.02.03 OH 0.2000 Rp -
Kepala Tukang L.03.01 OH 0.0200 Rp -
Mandor L.04.01 OH 0.0300 Rp -
JUMLAH TENAGA KERJA Rp -
B BAHAN
Bata merah m3 90.9091 Rp -
Semen portland Kg 32.9500 Rp -
Pasir Pasang m3 0.0910 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp -
E Overhead & Profit 15% 15% Rp -
F Harga Satuan Pekerjaan (D+E) Rp - Rp -
A.4.4.1.3. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 Rp 157,643 Rp 94,586
Tukang Batu L.02.03 OH 0.2000 Rp 166,729 Rp 33,346
Kepala Tukang L.03.01 OH 0.0200 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.0300 Rp 194,274 Rp 5,828
JUMLAH TENAGA KERJA Rp 137,413
B BAHAN
Bata merah m3 140.0000 Rp -
Semen portland Kg 26.5500 Rp -
Pasir Pasang m3 0.0930 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 137,413
E Overhead & Profit 15% 15% Rp 20,612
F Harga Satuan Pekerjaan (D+E) Rp - Rp 158,025
A.4.4.1.4. Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 Rp 157,643 Rp 94,586
Tukang Batu L.02.03 OH 0.2000 Rp 166,729 Rp 33,346
Kepala Tukang L.03.01 OH 0.0200 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.0300 Rp 194,274 Rp 5,828
JUMLAH TENAGA KERJA Rp 137,413
B BAHAN
Bata merah m3 140.0000 Rp -
Semen portland Kg 22.2000 Rp -
Pasir Pasang m3 0.1020 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 137,413
E Overhead & Profit 15% 15% Rp 20,612
F Harga Satuan Pekerjaan (D+E) Rp - Rp 158,025
A.4.4.1.5. Pemasangan 1m2 Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP (Bekisting Bata)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 Rp -
Tukang Batu L.02.03 OH 0.2000 Rp -
Kepala Tukang L.03.01 OH 0.0200 Rp -
Mandor L.04.01 OH 0.0300 Rp -
JUMLAH TENAGA KERJA Rp -
B BAHAN
Bata merah m3 140.0000 Rp -
Semen portland Kg 18.5000 Rp -
Pasir Pasang m3 0.1220 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp -
E Overhead & Profit 15% 15% Rp -
F Harga Satuan Pekerjaan (D+E) Rp - Rp -
A.4.4.1.6 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.6000 Rp -
Tukang Batu L.02.03 OH 0.2000 Rp -
Kepala Tukang L.03.01 OH 0.0200 Rp -
Mandor L.04.01 OH 0.0300 Rp -
JUMLAH TENAGA KERJA Rp -
B BAHAN
Bata merah m3 140.0000 Rp -
Semen portland Kg 10.0800 Rp -
Kapur m3 0.0275 Rp -
Pasir Pasang m3 0.0925 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp -
E Overhead & Profit 15% 15% Rp -
F Harga Satuan Pekerjaan (D+E) Rp - Rp -
A.4.4.1.7 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp -
Tukang Batu L.02.03 OH 0.1000 Rp -
Kepala Tukang L.03.01 OH 0.0100 Rp -
Mandor L.04.01 OH 0.0150 Rp -
JUMLAH TENAGA KERJA Rp -
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 18.9500 Rp -
Pasir Pasang m3 0.0380 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp -
E Overhead & Profit 15% 15% Rp -
F Harga Satuan Pekerjaan (D+E) Rp - Rp -
A.4.4.1.8 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp 850 Rp 59,500
Semen portland Kg 14.3700 Rp 1,500 Rp 21,555
Pasir Pasang m3 0.0400 Rp 226,000 Rp 9,040
JUMLAH HARGA BAHAN Rp 90,095
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 158,802
E Overhead & Profit 15% 15% Rp 23,820
F Harga Satuan Pekerjaan (D+E) Rp - Rp 182,621
A.4.4.1.9 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 11.5000 Rp -
Pasir Pasang m3 0.0430 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.10 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 9.6800 Rp -
Pasir Pasang m3 0.0450 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.11 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 8.3200 Rp -
Pasir Pasang m3 0.0490 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.12 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 6.5000 Rp -
Pasir Pasang m3 0.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.13 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen portland Kg 4.5000 Rp -
Kapur m3 0.0150 Rp -
Pasir Pasang m3 0.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.14 Pemasangan 1m2 dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen Merah Kg 0.0180 Rp -
Kapur m3 0.0180 Rp -
Pasir Pasang m3 0.0180 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.15 Pemasangan 1m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata merah m3 70.0000 Rp -
Semen Merah Kg 0.0140 Rp -
Kapur m3 0.0140 Rp -
Pasir Pasang m3 0.0280 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.22 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :3PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata rooster m3 30.0000 Rp -
Semen portland Kg 11.0000 Rp -
Pasir Pasang m3 0.0350 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.23 Pemasangan 1 cm2 dinding terawang (rooster) 12x11x24 campuran 1SP :4PP
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3000 Rp 157,643 Rp 47,293
Tukang Batu L.02.03 OH 0.1000 Rp 166,729 Rp 16,673
Kepala Tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0150 Rp 194,274 Rp 2,914
JUMLAH TENAGA KERJA Rp 68,707
B BAHAN
Bata berongga m3 30.0000 Rp -
Semen portland Kg 11.0000 Rp -
Pasir Pasang m3 0.0350 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 68,707
E Overhead & Profit 15% 15% Rp 10,306
F Harga Satuan Pekerjaan (D+E) Rp - Rp 79,012
A.4.4.1.25 Pemasangan 1 m2 dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B.
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 Rp 157,643 Rp 55,175
Tukang Batu L.02.03 OH 0.130 Rp 166,729 Rp 21,675
Kepala Tukang L.03.01 OH 0.013 Rp 182,676 Rp 2,375
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 79,807
B BAHAN
Bata ringan tebal 7,5 cm m3 0.075 Rp -
Mortar siap pakai Kg 2.772 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 79,807
E Overhead & Profit 15% 15% Rp 11,971
F Harga Satuan Pekerjaan (D+E) Rp - Rp 91,778
A.4.4.1.26 Pemasangan 1 m2 dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.350 Rp 157,643 Rp 55,175
Tukang Batu L.02.03 OH 0.130 Rp 166,729 Rp 21,675
Kepala Tukang L.03.01 OH 0.013 Rp 182,676 Rp 2,375
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 79,807
B BAHAN
Bata ringan tebal 7,5 cm m3 0.1 Rp -
Mortar siap pakai Kg 4.4 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 79,807
E Overhead & Profit 15% 15% Rp 11,971
F Harga Satuan Pekerjaan (D+E) Rp - Rp 91,778
A.4.4.3.11. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 Rp 157,643 Rp 39,411
Tukang Batu L.02.03 OH 0.1250 Rp 166,729 Rp 20,841
Kepala tukang L.03.01 OH 0.0130 Rp 182,676 Rp 2,375
Mandor L.04.01 OH 0.0130 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 65,152
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 Rp -
Semen portland kg 9.8000 Rp -
Semen Warna Kg 1.3000 Rp -
Pasir Pasang M3 0.0450 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 65,152
E Overhead & Profit 15% 15% Rp 9,773
F Harga Satuan Pekerjaan (D+E) Rp - Rp 74,925
A.4.4.3.13. Pemasangan 1m2 lantai ubin teralux marmer ukuran 60cm x60cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2400 Rp 157,643 Rp 37,834
Tukang Batu L.02.03 OH 0.1200 Rp 166,729 Rp 20,007
Kepala tukang L.03.01 OH 0.0120 Rp 182,676 Rp 2,192
Mandor L.04.01 OH 0.0120 Rp 194,274 Rp 2,331
JUMLAH TENAGA KERJA Rp 62,365
B BAHAN
ubin teralux marmer ukuran 60cm x60cm Bh 3.1000 Rp -
Semen portland kg 9.6000 Rp -
Semen Warna Kg 1.5000 Rp -
Pasir Pasang M3 0.0450 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 62,365
E Overhead & Profit 15% 15% Rp 9,355
F Harga Satuan Pekerjaan (D+E) Rp - Rp 71,719
A.4.4.3.14. Pemasangan 1m2 lantai ubin teralux marmer ukuran 40cm x40cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 Rp 157,643 Rp 39,411
Tukang Batu L.02.03 OH 0.1250 Rp 166,729 Rp 20,841
Kepala tukang L.03.01 OH 0.0130 Rp 182,676 Rp 2,375
Mandor L.04.01 OH 0.0130 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 65,152
B BAHAN
ubin teralux marmer ukuran 40cm x40cm Bh 6.6300 Rp -
Semen portland kg 9.8000 Rp -
Semen Warna Kg 1.3000 Rp -
Pasir Pasang M3 0.0450 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 65,152
E Overhead & Profit 15% 15% Rp 9,773
F Harga Satuan Pekerjaan (D+E) Rp - Rp 74,925
A.4.4.3.15. Pemasangan 1m2 lantai ubin teralux marmer ukuran 30cm x30cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2600 Rp 157,643 Rp 40,987
Tukang Batu L.02.03 OH 0.1300 Rp 166,729 Rp 21,675
Kepala tukang L.03.01 OH 0.0130 Rp 182,676 Rp 2,375
Mandor L.04.01 OH 0.0130 Rp 194,274 Rp 2,526
JUMLAH TENAGA KERJA Rp 67,562
B BAHAN
ubin teralux marmer ukuran 30cm x30cm Bh 11.8700 Rp -
Semen portland kg 10.0000 Rp -
Semen Warna Kg 1.5000 Rp -
Pasir Pasang M3 0.0450 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 67,562
E Overhead & Profit 15% 15% Rp 10,134
F Harga Satuan Pekerjaan (D+E) Rp - Rp 77,696
A.4.4.3.33. Pemasangan 1m2 lantai keramik artistik 10cm x 10cm atau 5cm x 20cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 Rp 157,643 Rp 110,350
Tukang Batu L.02.03 OH 0.3500 Rp 166,729 Rp 58,355
Kepala tukang L.03.01 OH 0.0350 Rp 182,676 Rp 6,394
Mandor L.04.01 OH 0.0350 Rp 194,274 Rp 6,800
JUMLAH TENAGA KERJA Rp 181,899
B BAHAN
keramik artistik 10cm x 10cm atau 5cm x 20cm Bh 106.0000 Rp -
Semen portland Kg 8.1900 Rp -
Pasir Pasang M3 0.0450 Rp -
Semen Warna Kg 3.2000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 181,899
E Overhead & Profit 15% 15% Rp 27,285
F Harga Satuan Pekerjaan (D+E) Rp - Rp 209,183
A.4.4.3.54.(2) Pemasangan 1 m2 dinding Granit Tile Black Gold uk. 60cm x 60cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.9000 Rp 157,643 Rp 141,879
Tukang Batu L.02.03 OH 0.4500 Rp 166,729 Rp 75,028
Kepala tukang L.03.01 OH 0.0450 Rp 182,676 Rp 8,220
Mandor L.04.01 OH 0.0450 Rp 194,274 Rp 8,742
JUMLAH TENAGA KERJA Rp 233,870
B BAHAN
Granit Tile Black Gold 60cm x 60cm bh 2.7778 Rp 154,667 Rp 429,630
Semen portland Kg 9.3000 Rp 1,500 Rp 13,950
Pasir Pasang M3 0.0180 Rp 226,000 Rp 4,068
Semen Warna Kg 1.9400 Rp 25,000 Rp 48,500
JUMLAH HARGA BAHAN Rp 496,148
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 730,017
E Overhead & Profit 15% 15% Rp 109,503
F Harga Satuan Pekerjaan (D+E) Rp - Rp 839,519
A.4.5.1.5. Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1000 Rp 157,643 Rp 15,764
Tukang kayu L.02.04 OH 0.1000 Rp 166,729 Rp 16,673
Kepala tukang L.03.01 OH 0.0100 Rp 182,676 Rp 1,827
Mandor L.04.01 OH 0.0050 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 35,235
B BAHAN
Tripleks Lembar 0.3750 Rp -
Paku tripleks kg 0.0300 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 35,235
E Overhead & Profit 15% 15% Rp 5,285
F Harga Satuan Pekerjaan (D+E) Rp - Rp 40,520
A.4.5.1.8. Pemasangan 1 m2 langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.5000 Rp 157,643 Rp 78,822
Tukang kayu L.02.04 OH 0.5000 Rp 166,729 Rp 83,365
Kepala tukang L.03.01 OH 0.0500 Rp 182,676 Rp 9,134
Mandor L.04.01 OH 0.0250 Rp 194,274 Rp 4,857
JUMLAH TENAGA KERJA Rp 176,177
B BAHAN
Profil Allum"T" m 3.6000 Rp -
Kawat dia 4 mm kg 0.1500 Rp -
Ramset Buah 1.0500 Rp -
Akustik 60 x 120 Lembar 1.5000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 176,177
E Overhead & Profit 15% 15% Rp 26,426
F Harga Satuan Pekerjaan (D+E) Rp - Rp 202,603
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.0000 Rp 157,643 Rp 945,858
Tukang kayu L.02.04 OH 18.0000 Rp 166,729 Rp 3,001,122
Kepala tukang L.03.01 OH 1.8000 Rp 182,676 Rp 328,817
Mandor L.04.01 OH 0.3000 Rp 194,274 Rp 58,282
JUMLAH TENAGA KERJA Rp 4,334,079
B BAHAN
Balok kayu m3 1.2000 Rp -
Paku Biasa Kg 1.2500 Rp -
Lem Kayu/Karet Kg 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 4,334,079
E Overhead & Profit 15% 15% Rp 650,112
F Harga Satuan Pekerjaan (D+E) Rp - Rp 4,984,190
A.4.6.1.3. Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 Rp 157,643 Rp 55,175
Tukang kayu L.02.04 OH 1.0500 Rp 166,729 Rp 175,065
Kepala tukang L.03.01 OH 0.1050 Rp 182,676 Rp 19,181
Mandor L.04.01 OH 0.0180 Rp 194,274 Rp 3,497
JUMLAH TENAGA KERJA Rp 252,918
B BAHAN
kayu Papan m3 0.0400 Rp -
Paku Biasa Kg 0.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 252,918
E Overhead & Profit 15% 15% Rp 37,938
F Harga Satuan Pekerjaan (D+E) Rp - Rp 290,856
A.4.6.1.4. Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.3500 Rp 157,643 Rp 55,175
Tukang kayu L.02.04 OH 1.0500 Rp 166,729 Rp 175,065
Kepala tukang L.03.01 OH 0.1050 Rp 182,676 Rp 19,181
Mandor L.04.01 OH 0.0180 Rp 194,274 Rp 3,497
JUMLAH TENAGA KERJA Rp 252,918
B BAHAN
kayu Papan m3 0.0400 Rp -
Paku Biasa Kg 0.0500 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 252,918
E Overhead & Profit 15% 15% Rp 37,938
F Harga Satuan Pekerjaan (D+E) Rp - Rp 290,856
A.4.6.1.5. Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 Rp 157,643 Rp 157,643
Tukang kayu L.02.04 OH 3.0000 Rp 166,729 Rp 500,187
Kepala tukang L.03.01 OH 0.3000 Rp 182,676 Rp 54,803
Mandor L.04.01 OH 0.0500 Rp 194,274 Rp 9,714
JUMLAH TENAGA KERJA Rp 722,347
B BAHAN
kayu Papan m3 0.0400 Rp -
Lem Kayu/Karet Kg 0.5000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 722,347
E Overhead & Profit 15% 15% Rp 108,352
F Harga Satuan Pekerjaan (D+E) Rp - Rp 830,698
A.4.6.1.6. Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 Rp 157,643 Rp 126,114
Tukang kayu L.02.04 OH 2.4000 Rp 166,729 Rp 400,150
Kepala tukang L.03.01 OH 0.2400 Rp 182,676 Rp 43,842
Mandor L.04.01 OH 0.0400 Rp 194,274 Rp 7,771
JUMLAH TENAGA KERJA Rp 577,877
B BAHAN
kayu Papan m3 0.0240 Rp -
Lem Kayu/Karet Kg 0.3000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 577,877
E Overhead & Profit 15% 15% Rp 86,682
F Harga Satuan Pekerjaan (D+E) Rp - Rp 664,558
A.4.6.1.7. Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.0000 Rp 157,643 Rp 157,643
Tukang kayu L.02.04 OH 3.0000 Rp 166,729 Rp 500,187
Kepala tukang L.03.01 OH 0.3000 Rp 182,676 Rp 54,803
Mandor L.04.01 OH 0.0500 Rp 194,274 Rp 9,714
JUMLAH TENAGA KERJA Rp 722,347
B BAHAN
kayu Papan m3 0.0640 Rp -
Lem Kayu/Karet Kg 0.5000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 722,347
E Overhead & Profit 15% 15% Rp 108,352
F Harga Satuan Pekerjaan (D+E) Rp - Rp 830,698
A.4.6.1.8. Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.7000 Rp 157,643 Rp 110,350
Tukang kayu L.02.04 OH 2.1000 Rp 166,729 Rp 350,131
Kepala tukang L.03.01 OH 0.2100 Rp 182,676 Rp 38,362
Mandor L.04.01 OH 0.0350 Rp 194,274 Rp 6,800
JUMLAH TENAGA KERJA Rp 505,643
B BAHAN
kayu Papan m3 0.0250 Rp -
Paku Biasa kg 0.0300 Rp -
Lem Kayu/Karet kg 0.5000 Rp -
Plywood 4 mm Lembar 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 505,643
E Overhead & Profit 15% 15% Rp 75,846
F Harga Satuan Pekerjaan (D+E) Rp - Rp 581,488
A.4.6.1.9. Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.8000 Rp 157,643 Rp 126,114
Tukang kayu L.02.04 OH 2.4000 Rp 166,729 Rp 400,150
Kepala tukang L.03.01 OH 0.2400 Rp 182,676 Rp 43,842
Mandor L.04.01 OH 0.0400 Rp 194,274 Rp 7,771
JUMLAH TENAGA KERJA Rp 577,877
B BAHAN
kayu Papan m3 0.0256 Rp -
Paku Biasa kg 0.0300 Rp -
Lem Kayu/Karet kg 0.5000 Rp -
Plywood 4 mm Lembar 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 577,877
E Overhead & Profit 15% 15% Rp 86,682
F Harga Satuan Pekerjaan (D+E) Rp - Rp 664,558
A.4.6.1.12. Pemasangan 1 m2 teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.85 Rp 157,643 Rp 133,997
Tukang kayu L.02.04 OH 2.550 Rp 166,729 Rp 425,159
Kepala tukang L.03.01 OH 0.255 Rp 182,676 Rp 46,582
Mandor L.04.01 OH 0.043 Rp 194,274 Rp 8,354
JUMLAH TENAGA KERJA Rp 614,092
B BAHAN
Kayu Papan m3 0.025 Rp -
Paku Biasa kg 0.03 Rp -
Lem Kayu/Karet kg 0.8 Rp -
Teakwood 4 mm 90 x 220 cm Lembar 1.000 Rp -
Formika Lembar 0.5 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 614,092
E Overhead & Profit 15% 15% Rp 92,114
F Harga Satuan Pekerjaan (D+E) Rp - Rp 706,205
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.000 Rp 157,643 Rp 630,572
Tukang kayu L.02.04 OH 12.000 Rp 166,729 Rp 2,000,748
Kepala tukang L.03.01 OH 1.200 Rp 182,676 Rp 219,211
Mandor L.04.01 OH 0.2 Rp 194,274 Rp 38,855
JUMLAH TENAGA KERJA Rp 2,889,386
B BAHAN
Balok kayu m3 1.100 Rp -
Besi strip kg 15.000 Rp -
Paku Biasa kg 5.600 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 2,889,386
E Overhead & Profit 15% 15% Rp 433,408
F Harga Satuan Pekerjaan (D+E) Rp - Rp 3,322,793
A.4.6.1.19. Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 Rp 157,643 Rp 23,646
Tukang kayu L.02.04 OH 0.3 Rp 166,729 Rp 50,019
Kepala tukang L.03.01 OH 0.03 Rp 182,676 Rp 5,480
Mandor L.04.01 OH 0.075 Rp 194,274 Rp 14,571
JUMLAH TENAGA KERJA Rp 93,716
B BAHAN
Kayu 5/7 m3 0.0154 Rp -
Paku Biasa kg 0.2 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 93,716
E Overhead & Profit 15% 15% Rp 14,057
F Harga Satuan Pekerjaan (D+E) Rp - Rp 107,773
A.4.6.1.20. Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2 Rp 157,643 Rp 31,529
Tukang kayu L.02.04 OH 0.3 Rp 166,729 Rp 50,019
Kepala tukang L.03.01 OH 0.03 Rp 182,676 Rp 5,480
Mandor L.04.01 OH 0.01 Rp 194,274 Rp 1,943
JUMLAH TENAGA KERJA Rp 88,970
B BAHAN
Kayu 5/7 m3 0.0163 Rp -
Paku Biasa kg 0.25 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 88,970
E Overhead & Profit 15% 15% Rp 13,346
F Harga Satuan Pekerjaan (D+E) Rp - Rp 102,315
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 Rp 157,643 Rp 15,764
Tukang kayu L.02.04 OH 0.2 Rp 166,729 Rp 33,346
Kepala tukang L.03.01 OH 0.02 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.005 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 53,735
B BAHAN
Kayu Papan m3 0.0108 Rp -
Paku Biasa kg 0.1 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 53,735
E Overhead & Profit 15% 15% Rp 8,060
F Harga Satuan Pekerjaan (D+E) Rp - Rp 61,795
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.1 Rp 157,643 Rp 15,764
Tukang kayu L.02.04 OH 0.2 Rp 166,729 Rp 33,346
Kepala tukang L.03.01 OH 0.02 Rp 182,676 Rp 3,654
Mandor L.04.01 OH 0.005 Rp 194,274 Rp 971
JUMLAH TENAGA KERJA Rp 53,735
B BAHAN
Kayu Papan m3 0.011 Rp -
Paku Biasa kg 0.05 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 53,735
E Overhead & Profit 15% 15% Rp 8,060
F Harga Satuan Pekerjaan (D+E) Rp - Rp 61,795
A.4.6.1.23. Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.15 Rp 157,643 Rp 23,646
Tukang kayu L.02.04 OH 0.45 Rp 166,729 Rp 75,028
Kepala tukang L.03.01 OH 0.045 Rp 182,676 Rp 8,220
Mandor L.04.01 OH 0.008 Rp 194,274 Rp 1,554
JUMLAH TENAGA KERJA Rp 108,449
B BAHAN
Balok kayu m3 0.028 Rp -
Paku Biasa kg 0.15 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 108,449
E Overhead & Profit 15% 15% Rp 16,267
F Harga Satuan Pekerjaan (D+E) Rp - Rp 124,716
A.4.7.1.4. 1 m2 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 Rp 157,643 Rp 11,035
Tukang cat L.02.08 OH 0.009 Rp 166,729 Rp 1,501
Kepala tukang L.03.01 OH 0.006 Rp 182,676 Rp 1,096
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 14,214
B BAHAN
Cat menie Kg 0.200 Rp -
Plamuur Kg 0.150 Rp -
Cat dasar Kayu Kg 0.170 Rp -
Cat Penutup Kayu Kg 0.260 Rp -
Kuas Bh 0.010 Rp -
Pengencer Kg 0.030 Rp -
Ampelas Lbr 0.200 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 14,214
E Overhead & Profit 15% 15% Rp 2,132
F Harga Satuan Pekerjaan (D+E) Rp - Rp 16,346
A.4.7.1.5. Pengecatan 1 m2 bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.070 Rp 157,643 Rp 11,035
Tukang cat L.02.08 OH 0.105 Rp 166,729 Rp 17,507
Kepala tukang L.03.01 OH 0.004 Rp 182,676 Rp 731
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 29,855
B BAHAN
Cat menie Kg 0.200 Rp -
Plamuur Kg 0.150 Rp -
Cat dasar Kayu Kg 0.170 Rp -
Cat Penutup Kayu Kg 0.350 Rp -
Kuas Bh 0.010 Rp -
Pengencer Kg 0.030 Rp -
Ampelas Lbr 0.200 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 29,855
E Overhead & Profit 15% 15% Rp 4,478
F Harga Satuan Pekerjaan (D+E) Rp - Rp 34,333
A.4.7.1.11. Pengecatan 1 m2 tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.028 Rp 157,643 Rp 4,414
Tukang cat L.02.08 OH 0.042 Rp 166,729 Rp 7,003
Kepala tukang L.03.01 OH 0.004 Rp 182,676 Rp 767
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 12,767
B BAHAN
Cat dasar Tembok Kg 0.120 Rp -
Cat Penutup Tembok Kg 0.180 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 12,767
E Overhead & Profit 15% 15% Rp 1,915
F Harga Satuan Pekerjaan (D+E) Rp - Rp 14,681
A.4.7.1.19. Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 Rp 157,643 Rp 9,459
Tukang cat L.02.08 OH 0.060 Rp 166,729 Rp 10,004
Kepala tukang L.03.01 OH 0.012 Rp 182,676 Rp 2,192
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 22,237
B BAHAN
Cat Besi Kg 0.300 Rp -
Kuas Bh 0.010 Rp -
Pengencer L 0.010 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 22,237
E Overhead & Profit 15% 15% Rp 3,336
F Harga Satuan Pekerjaan (D+E) Rp - Rp 25,572
A.4.7.1.21. Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.400 Rp 157,643 Rp 63,057
Tukang cat L.02.08 OH 0.700 Rp 166,729 Rp 116,710
Kepala tukang L.03.01 OH 0.070 Rp 182,676 Rp 12,787
Mandor L.04.01 OH 0.020 Rp 194,274 Rp 3,885
JUMLAH TENAGA KERJA Rp 196,440
B BAHAN
Cat Besi Kg 0.300 Rp -
Pengencer L 0.010 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 196,440
E Overhead & Profit 15% 15% Rp 29,466
F Harga Satuan Pekerjaan (D+E) Rp - Rp 225,906
A.5.1.1 8. (K3) Pemasangan 1 buah bak mandi batu bata vol 0,30 m3
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.000 Rp 157,643 Rp 945,858
Tukang batu L.02.03 OH 3.000 Rp 166,729 Rp 500,187
Kepala tukang L.03.01 OH 0.300 Rp 182,676 Rp 54,803
Mandor L.04.01 OH 0.030 Rp 194,274 Rp 5,828
JUMLAH TENAGA KERJA Rp 1,506,676
B BAHAN
Bata merah M3 150.000 Rp -
Semen portland Kg 120.000 Rp -
Pasir pasang M3 0.300 Rp -
Porselen 11x11 bh 360.000 Rp -
Semen warna Kg 6.000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,506,676
E Overhead & Profit 15% 15% Rp 226,001
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,732,677
A.5.1.1 15. Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.160 Rp 157,643 Rp 340,509
Tukang batu L.02.03 OH 0.720 Rp 166,729 Rp 120,045
Kepala tukang L.03.01 OH 0.072 Rp 182,676 Rp 13,153
Mandor L.04.01 OH 0.011 Rp 194,274 Rp 2,137
JUMLAH TENAGA KERJA Rp 475,843
B BAHAN
Bata merah bh 40.000 Rp -
Semen portland Kg 44.000 Rp -
Pasir pasang M3 0.070 Rp -
Pasir beton M3 0.060 Rp -
Kerikil M3 0.070 Rp -
Baja tulangan Kg 1.600 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 475,843
E Overhead & Profit 15% 15% Rp 71,377
F Harga Satuan Pekerjaan (D+E) Rp - Rp 547,219
A.5.1.1 16. Pemasangan 1 buah bak kontrol pasangan bata 45cm x45cm tinggi 50 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 Rp 157,643 Rp 504,458
Tukang batu L.02.03 OH 1.150 Rp 166,729 Rp 191,738
Kepala tukang L.03.01 OH 0.011 Rp 182,676 Rp 2,009
Mandor L.04.01 OH 0.016 Rp 194,274 Rp 3,108
JUMLAH TENAGA KERJA Rp 701,314
B BAHAN
Bata merah bh 70.000 Rp -
Semen portland Kg 77.000 Rp -
Pasir pasang M3 0.130 Rp -
Pasir beton M3 0.090 Rp -
Kerikil M3 0.020 Rp -
Baja tulangan Kg 2.600 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 701,314
E Overhead & Profit 15% 15% Rp 105,197
F Harga Satuan Pekerjaan (D+E) Rp - Rp 806,510
A.5.1.1 17. Pemasangan 1 buah bak kontrol pasangan bata 60cm x60cm tinggi 65 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.200 Rp 157,643 Rp 504,458
Tukang batu L.02.03 OH 1.150 Rp 166,729 Rp 191,738
Kepala tukang L.03.01 OH 0.011 Rp 182,676 Rp 2,009
Mandor L.04.01 OH 0.016 Rp 194,274 Rp 3,108
JUMLAH TENAGA KERJA Rp 701,314
B BAHAN
Bata merah bh 123.000 Rp -
Semen portland Kg 114.000 Rp -
Pasir pasang M3 0.184 Rp -
Pasir beton M3 0.120 Rp -
Kerikil M3 0.033 Rp -
Baja tulangan Kg 4.850 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 701,314
E Overhead & Profit 15% 15% Rp 105,197
F Harga Satuan Pekerjaan (D+E) Rp - Rp 806,510
A.5.1.1 34. Pemasangan 1 m’ pipa air limbah jenis pipa tanah diameter 15 cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.060 Rp 157,643 Rp 9,459
Tukang batu L.02.03 OH 0.030 Rp 166,729 Rp 5,002
Kepala tukang L.03.01 OH 0.003 Rp 182,676 Rp 548
Mandor L.04.01 OH 0.003 Rp 194,274 Rp 583
JUMLAH TENAGA KERJA Rp 15,591
B BAHAN
Pipa tanah Bh 1.600 Rp -
Semen portland Kg 0.680 Rp -
Pasir pasang M3 0.013 Rp -
Pasir urug M3 0.011 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 15,591
E Overhead & Profit 15% 15% Rp 2,339
F Harga Satuan Pekerjaan (D+E) Rp - Rp 17,929
A.8.4.4.2 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 100 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 1.6460 Rp 157,643 Rp 259,480
Tukang pipa L.02.13 OH 0.8230 Rp 166,729 Rp 137,218
Mandor L.04.01 OH 0.1650 Rp 194,274 Rp 32,055
JUMLAH TENAGA KERJA Rp 428,754
B BAHAN
Pipa Ø 100 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.6500 Rp -
Sewa Genset 1500 watt hari 0.1590 Rp -
Sewa Pompa Submersible 3m3/h hari 1.0780 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 0.9110 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 428,754
E Overhead & Profit 15% 15% Rp 64,313
F Harga Satuan Pekerjaan (D+E) Rp - Rp 493,066
A.8.4.4.3 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 150 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.0960 Rp 157,643 Rp 330,420
Tukang pipa L.02.13 OH 1.0480 Rp 166,729 Rp 174,732
Mandor L.04.01 OH 0.2100 Rp 194,274 Rp 40,798
JUMLAH TENAGA KERJA Rp 545,949
B BAHAN
Pipa Ø 150 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.7600 Rp -
Sewa Genset 1500 watt hari 0.3690 Rp -
Sewa Pompa Submersible 3m3/h hari 1.3530 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.0260 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 545,949
E Overhead & Profit 15% 15% Rp 81,892
F Harga Satuan Pekerjaan (D+E) Rp - Rp 627,841
A.8.4.4.4 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 200 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.5460 Rp 157,643 Rp 401,359
Tukang pipa L.02.13 OH 1.2730 Rp 166,729 Rp 212,246
Mandor L.04.01 OH 0.2550 Rp 194,274 Rp 49,540
JUMLAH TENAGA KERJA Rp 663,145
B BAHAN
Pipa Ø 200 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.8700 Rp -
Sewa Genset 1500 watt hari 0.5790 Rp -
Sewa Pompa Submersible 3m3/h hari 1.6280 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.1410 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 663,145
E Overhead & Profit 15% 15% Rp 99,472
F Harga Satuan Pekerjaan (D+E) Rp - Rp 762,616
A.8.4.4.5 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 250 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 2.9960 Rp 157,643 Rp 472,298
Tukang pipa L.02.13 OH 1.4980 Rp 166,729 Rp 249,760
Mandor L.04.01 OH 0.3000 Rp 194,274 Rp 58,282
JUMLAH TENAGA KERJA Rp 780,341
B BAHAN
Pipa Ø 250 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 0.9800 Rp -
Sewa Genset 1500 watt hari 0.7890 Rp -
Sewa Pompa Submersible 3m3/h hari 1.9030 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.2560 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 780,341
E Overhead & Profit 15% 15% Rp 117,051
F Harga Satuan Pekerjaan (D+E) Rp - Rp 897,391
A.8.4.4.6 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 300 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 3.4460 Rp 157,643 Rp 543,238
Tukang pipa L.02.13 OH 1.7230 Rp 166,729 Rp 287,274
Mandor L.04.01 OH 0.3450 Rp 194,274 Rp 67,025
JUMLAH TENAGA KERJA Rp 897,536
B BAHAN
Pipa Ø 300 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.0900 Rp -
Sewa Genset 1500 watt hari 0.9990 Rp -
Sewa Pompa Submersible 3m3/h hari 2.1780 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.3710 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 897,536
E Overhead & Profit 15% 15% Rp 134,630
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,032,166
A.8.4.4.7 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 400 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.3460 Rp 157,643 Rp 685,116
Tukang pipa L.02.13 OH 2.1730 Rp 166,729 Rp 362,302
Mandor L.04.01 OH 0.4350 Rp 194,274 Rp 84,509
JUMLAH TENAGA KERJA Rp 1,131,928
B BAHAN
Pipa Ø 400 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.3100 Rp -
Sewa Genset 1500 watt hari 1.4190 Rp -
Sewa Pompa Submersible 3m3/h hari 2.7280 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.6010 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,131,928
E Overhead & Profit 15% 15% Rp 169,789
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,301,716
A.8.4.4.8 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 450 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 4.7960 Rp 157,643 Rp 756,056
Tukang pipa L.02.13 OH 2.3980 Rp 166,729 Rp 399,816
Mandor L.04.01 OH 0.4800 Rp 194,274 Rp 93,252
JUMLAH TENAGA KERJA Rp 1,249,123
B BAHAN
Pipa Ø 450 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.4200 Rp -
Sewa Genset 1500 watt hari 1.6290 Rp -
Sewa Pompa Submersible 3m3/h hari 3.0030 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.7160 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,249,123
E Overhead & Profit 15% 15% Rp 187,369
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,436,492
A.8.4.4.9 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 500 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 5.2460 Rp 157,643 Rp 826,995
Tukang pipa L.02.13 OH 2.6230 Rp 166,729 Rp 437,330
Mandor L.04.01 OH 0.5250 Rp 194,274 Rp 101,994
JUMLAH TENAGA KERJA Rp 1,366,319
B BAHAN
Pipa Ø 500 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.5300 Rp -
Sewa Genset 1500 watt hari 1.8390 Rp -
Sewa Pompa Submersible 3m3/h hari 3.2780 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 1.8310 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,366,319
E Overhead & Profit 15% 15% Rp 204,948
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,571,267
A.8.4.4.10 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 600 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 6.1460 Rp 157,643 Rp 968,874
Tukang pipa L.02.13 OH 3.0730 Rp 166,729 Rp 512,358
Mandor L.04.01 OH 0.6150 Rp 194,274 Rp 119,479
JUMLAH TENAGA KERJA Rp 1,600,711
B BAHAN
Pipa Ø 600 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.7500 Rp -
Sewa Genset 1500 watt hari 2.2590 Rp -
Sewa Pompa Submersible 3m3/h hari 3.8280 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 2.0610 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,600,711
E Overhead & Profit 15% 15% Rp 240,107
F Harga Satuan Pekerjaan (D+E) Rp - Rp 1,840,817
A.8.4.4.11 (K3) Penyambungan 1 buah pipa baru ke pipa yang ada Ø 700 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.0460 Rp 157,643 Rp 1,110,753
Tukang pipa L.02.13 OH 3.5230 Rp 166,729 Rp 587,386
Mandor L.04.01 OH 0.7050 Rp 194,274 Rp 136,963
JUMLAH TENAGA KERJA Rp 1,835,102
B BAHAN
Pipa Ø 700 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 1.9700 Rp -
Sewa Genset 1500 watt hari 2.6790 Rp -
Sewa Pompa Submersible 3m3/h hari 4.3780 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 2.2910 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 1,835,102
E Overhead & Profit 15% 15% Rp 275,265
F Harga Satuan Pekerjaan (D+E) Rp - Rp 2,110,367
A.8.4.4.12 (K3) Penyambungan 1 buah 1 buah pipa baru ke pipa yang ada Ø 800 mm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 7.9460 Rp 157,643 Rp 1,252,631
Tukang pipa L.02.13 OH 3.9730 Rp 166,729 Rp 662,414
Mandor L.04.01 OH 0.7950 Rp 194,274 Rp 154,448
JUMLAH TENAGA KERJA Rp 2,069,493
B BAHAN
Pipa Ø 800 mm bh 1.0000 Rp -
JUMLAH HARGA BAHAN Rp -
C PERALATAN
Peralatan potong pipa T2/mekanik / cilinder saw hari 2.1900 Rp -
Sewa Genset 1500 watt hari 3.0990 Rp -
Sewa Pompa Submersible 3m3/h hari 4.9280 Rp -
Sewa Tripot/Tackel & handle crane 2 T hari 2.5210 Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 2,069,493
E Overhead & Profit 15% 15% Rp 310,424
F Harga Satuan Pekerjaan (D+E) Rp - Rp 2,379,917
A.8.4.7.2 Pemasangan 1m' Pengaman Dinding Dari Kawat Duri 5 baris dengan Tinggi 70cm
No Uraian Kode Satuan Koefisien Harga Satuan (RpJumlah Harga (Rp.)
A TENAGA
Pekerja L.01.01 OH 0.2500 Rp 157,643 Rp 39,411
Tukang batu L.02.03 OH 0.2500 Rp 166,729 Rp 41,682
Kepala tukang L.03.01 OH 0.0300 Rp 182,676 Rp 5,480
Mandor L.04.01 OH 0.0300 Rp 194,274 Rp 5,828
JUMLAH TENAGA KERJA Rp 92,402
B BAHAN
Kawat Duri Barbed Wire Heavy m' 5.50 Rp 2,900 Rp 15,950
Galvanized
Besi Siku m1 0.80 Rp 30,833 Rp 24,667
Pengelasan ls 1.00 Rp 24,667 Rp 24,667
JUMLAH HARGA BAHAN Rp 65,283
C PERALATAN Rp - Rp -
JUMLAH HARGA ALAT Rp -
D Jumlah (A+B+C) Rp - Rp 157,685
E Overhead & Profit 15% 15% Rp 23,653
F Harga Satuan Pekerjaan (D+E) Rp - Rp 181,337
B Bahan
Dolken kayu φ 8-10/400 cm
Semen portland
Seng gelombang
Pasir beton
Koral beton
Kayu 5/7
Paku biasa 2” – 5”
Meni besi
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Balok 5/7
Paku 2"-3"
Kayu Papan 2/30
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A. 2.2.1.7. 3 (K3) Pembuatan 1 1m² gudang semen dan peralatan
A Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B Bahan
Dolken Kayu diameter 8-10/400 cm
Kayu Hutan
Paku Biasa
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang
Seng Pelat
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Dolken Kayu diameter 8-10/400 cm
Kayu
Paku Biasa
Semen Portland
Pasir Beton
Koral Beton
Seng Gelombang
Plywood 4 mm
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Pasir Urug
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Sirtu
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.A.4.1.1.4 13 Membuat 1 m³ lantai kerja beton mutu f’c = 7,4 MPa slump (3-6) cm, w/c = 0,87
A Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B Bahan
Semen Portland
Pasir Beton
Kerikil (Maks 30 mm)
Air
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Granit Tile
Semen Portland
Pasir Pasang
Semen Warna
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m’ plint granit tile ukuran 10 cm x 60 cm
A.4.4.3.28. (1) 15
A Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B Bahan
Plint Granit Tile
Semen Portland
Pasir Pasang
Semen Warna
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Bata Merah Kelas II
Semen Portland
Pasir Pasang
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Semen Portland
Pasir Pasang
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m² acian
A.4.4.2.27. 18
A Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B Bahan
Semen Portland
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Pemasangan 1 m² wallpaper
A.4.7.1.15. 19
A Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
B Bahan
Walpaper
Lem Walpaper
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.21.(1) 21 Pemasangan 1 m² rangka besi hollow 4/4 dan 2/4 berikut Gypsum board untuk pla
A Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor
B Bahan
Rangka Hollow 4x4
Rangka Hollow 2x4
Gypsum Board
Sekrup Gypsum
Kain Plester
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.20. (2) Pemasangan 1 m² Dinding Partisi 2 sisi Bahan Gypsum Rangka Hollow
A Tenaga
Pekerja
Tukang
Kepala Tukang
Mandor
B Bahan
Gypsum 9 mm
Besi Hollow 4/4
Besi Hollow 2/4
Sekrup
Kain Plester
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit 10%
F Harga Satuan Pekerjaan (D+E)
Sekrup Gypsum
Lis Plafon
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10. 22 Pengecatan 1 1m² tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penu
A Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
B Bahan
Pelamur
Cat Dasar
Cat Penutup
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.10.(1) 23 Pengecatan 1 1m² plafond baru (1 lapis Compound, 1 lapis cat dasar, 2 lapis cat pe
A Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
B Bahan
Compound
Cat Dasar
Cat Penutup
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.7.1.11. 24 Pengecatan 1 1m² tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
A Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor
B Bahan
Cat Dasar
Cat Penutup
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
PEKERJAAN BEKISTING
A.4.1.1.20. 25 (K3) Pemasangan 1 m² bekisting untuk pondasi
A Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
B Bahan
Kayu Kelas III
Paku 5-10 cm
Minyak Bekisting
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III
Paku 5 cm -10 cm
Minyak Bekisting
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III
Paku 5 cm -10 cm
Minyak Bekisting
Balok Kayu Kelas II
Multipleks Tebal 9 mm
Dolken Kayu @ 8 - 10 cm Panjang 4 m
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III
Paku 5 cm -10 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu @ 8 - 10 cm Panjang 4 m
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kayu Kelas III
Paku 5 cm -10 cm
Minyak Bekisting
Balok Kayu Kelas II
Plywood Tebal 9 mm
Dolken Kayu @ 8 - 10 cm Panjang 4 m
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Pipa listrik 5/8”
Kabel NYM 3 x 2.5
T Dus
L Bow
Las Dop
Klem
Mangkok
Saklar
Fitting Downlight 66664 Recessed Nickel Rumah Lampu 4"
Lampu Philips LED 12w 12 watt
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Pipa listrik 5/8”
Kabel NYM 3 x 2.5
T Dus
L Bow
Las Dop
Klem
Mangkok
Saklar
Lampu Spot Light
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kabel Nym 2 x 1.5
Adaptor
Saklar
Lampu Indirect LED
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Kusen dan Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 240 cm
B Bahan
Kusen Aluminium
Sekrup Fixer
Sealant
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.13. Pemasangan 1 m² pintu kaca rangka alluminium
A Tenaga
Pekerja
Tukang Aluminium
Kepala Tukang
Mandor
B Bahan
Pintu alluminium
Profil kaca 5 mm
Sekrup Fixer
Sealant
Lis Karet Kaca
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Engsel pintu
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Door Closer
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kunci Silinder
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kaca tebal 5 mm
Sealant
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kaca tebal 8 mm
Sealant
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
B Bahan
Kaca Tempered 12 mm
Sealant
C Peralatan
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Harga Jumlah
Satuan Koef.
Satuan Harga
lombang tinggi 2 meter
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 558,770
15% Rp 83,816
Rp 642,586
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 115,960
15% Rp 17,394
Rp 133,354
oh 1.0000 Rp 74,400 Rp 74,400
oh 2.0000 Rp 93,600 Rp 187,200
oh 0.2000 Rp 100,000 Rp 20,000
oh 0.0500 Rp 110,000 Rp 5,500
Jumlah Tenaga Kerja Rp 287,100
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 451,870
15% Rp 67,781
Rp 519,651
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 1,230,460
15% Rp 184,569
Rp 1,415,029
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 12,940
15% Rp 1,941
Rp 14,881
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 1,065,310
15% Rp 159,796
Rp 1,225,106
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 532,655
15% Rp 79,898
Rp 612,553
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 58,550
15% Rp 8,783
Rp 67,333
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 42,700
15% Rp 6,405
Rp 49,105
Rp -
Rp -
Rp -
Rp -
Jumlah Harga Bahan Rp -
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 42,700
15% Rp 6,405
Rp 49,105
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 294,620
15% Rp 44,193
Rp 338,813
Rp -
Rp -
Jumlah Harga Alat Rp -
Rp 287,750
15% Rp 43,163
Rp 330,913
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 949,825
15% Rp 142,474
Rp 1,092,299
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 84,609
15% Rp 12,691
Rp 97,300
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 123,625
15% Rp 18,544
Rp 142,169
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 55,854
15% Rp 8,378
Rp 64,232
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 31,540
15% Rp 4,731
Rp 36,271
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 149,483
15% Rp 22,422
Rp 171,905
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 179,466
15% Rp 26,920
Rp 206,386
angka Hollow
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 56,801
15% Rp 8,520
Rp 65,321
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 31,645
15% Rp 4,747
Rp 36,392
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 35,645
15% Rp 5,347
Rp 40,992
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 23,264
15% Rp 3,490
Rp 26,754
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 201,214
15% Rp 30,182
Rp 231,396
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 216,714
15% Rp 32,507
Rp 249,221
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 498,912
15% Rp 74,837
Rp 573,749
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 512,412
15% Rp 76,862
Rp 589,274
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 798,912
15% Rp 119,837
Rp 918,749
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 1,465,620
15% Rp 219,843
Rp 1,685,463
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 1,419,620
15% Rp 212,943
Rp 1,632,563
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 248,300
15% Rp 37,245
Rp 285,545
m 1 daun pintu, uk. 90 x 240 cm dengan sticker sandblast dan door closer, lengkap dengan aksesoris (PA1)
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 157,055
15% Rp 23,558
Rp 180,613
oh 0.0430 Rp 74,400 Rp 3,199
oh 0.0430 Rp 93,600 Rp 4,025
oh 0.0043 Rp 100,000 Rp 430
oh 0.0021 Rp 110,000 Rp 231
Jumlah Tenaga Kerja Rp 7,885
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 1,328,715
15% Rp 199,307
Rp 1,528,022
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 103,675
15% Rp 15,551
Rp 119,226
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 695,850
15% Rp 104,378
Rp 800,228
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 428,502
15% Rp 64,275
Rp 492,777
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 323,926
15% Rp 48,589
Rp 372,515
Rp - Rp -
Rp - Rp -
Jumlah Harga Alat Rp -
Rp 861,348
15% Rp 129,202
Rp 990,550
³
1 Dolken kayu φ 8-10/400 cm btg
2 Koral Beton m³
3 Seng gelombang BJLS 30 80x180 lbr
4 Seng Plat BJLS 90 cm m'
5 Kayu Kaso 5/7 Borneo m³
6 Meni besi kg
7 Semen Portland kg
8 Pasir Beton Bobot isi Pasir kg 1400 m³
9 Pasir Pasang Bobot isi Pasir kg 1400 m³
10 Pasir Urug m³
11 Sirtu m³
12 Kerikil (Maks 30 mm) Bobot isi Kerikil kg1350 m³
13 Air Liter
14 Granit Tile m²
15 Semen Warna kg
16 Plint Granit Tile m'
17 Plywood 4 mm lbr
18 Multipleks 9 mm lbr
19 Kayu Papan 2/30 m³
20 Kayu Hutan m³
21 Balok Kayu Kelas II m³
22 Kayu Kelas III m³
23 Paku 5-10 cm kg
24 Paku biasa 2” – 5” kg
25 Minyak Bekisting Liter
26 Amplas lbr
27 Besi Polos kg
28 Bata Merah Kelas II buah
29 Compound zak
30 Cat Dasar kg
31 Cat Penutup kg
32 Pelamur kg
MATERIAL DINDING PARTISI DAN PLAFOND
33 Gypsum board lbr
34 Lis Plafond m'
35 Rangka Hollow 4x4 m'
36 Rangka Hollow 2x4 m'
37 Kain Plester roll
38 Paku Skrup kg
39 Walpaper m²
40 Lem Walpaper kg
MATERIAL MEKANIKAL ELEKTRIKAL
41 Kabel NYM 3 x 2.5 mm Setara Supreme m'
42 Kabel NYM 3 x 1.5 mm Setara Supreme m'
43 Kabel NYM 2 x 2.5 mm Setara Supreme m'
44 Kabel NYM 2 x 1.5 mm Setara Supreme m'
45 Pipa conduit 20 mm clipsal btg
46 Kabel Listrik NYM 3x2,5 mm2 "Supreme" Roll @100Mtr m
47 T-Dos Putih 20 Mm Cabang 3 Kabel Bulat Lubang 20Mm Clipsal Tee Dus bh
48 Elbow E20 Pipa Merk Clipsal Pvc Tebal 20Mm bh
49 Lasdop Press / Penyambung Kabel CE5 CE-5 6Mm (100 Pcs) bh
50 Klem Pipa Listrik bh
51 Mongkok (Listrik) bh
52 Saklar (standar) bh
53 Philips Downlight 66664 Recessed Nickel Rumah Lampu 4" bh
54 Lampu Philips LED 12w 12 watt bh
55 Stop Kontak Panasonic CP Original bh
56 Seal Tape Listrik bh
57 Lampu Spot Light bh
58 Lampu Indirect LED m'
ALUMINIUM DAN KACA
59 Profil Kusen Aluminium m'
60 Sekrup Fixer bh
61 Sealant tube
62 Lis Karet Penjepit Kaca Pintu/Jendela m'
63 Kunci Pintu bh
64 Engsel Pintu bh
65 Lever Handle Staenliss Stell SUS 304 bh
66 Pull Handle Staenliss Stell SUS 304 tinggi maks 80 cm bh
67 Door closer bh
68 Florhings set
69 Patch Fitting PT10, PT20, PT24, US 10 Set
70 Patc fitting PT30 set
71 Engsel glass to glass setara Dekson set
72 Glass Holder pcs
73 Kunci glass to glass Ociuss pcs
74 Pipa stainless stell 1mmx1" SUS 304 m'
75 U chanel m'
76 Kaca cermin grey dekorasi wajik bevel m²
77 Rel pintu sorong Dekson Set
78 Kaca tebal 3mm m²
79 Kaca tebal 5 mm m²
80 Kaca tebal 8 mm m²
81 Kaca cermin 5 mm m²
82 Kaca Tempered Clear 10 mm m²
83 Kaca Tempered Clear 12 mm m²
MATERIAL SANITAIR
84 Closet duduk setara TOTOCW637J/SW637JP bh
85 Urinoir TOTO U57M bh
86 Shower Spray TOTO THX20NB bh
87 Shower Set Toto TX401SB bh
88 Wastafel TOTO LW592J bh
89 Kran Wastavel TOTO TX109LRS bh
90 Kran Dinding Toto T23B13V7NB bh
91 Soap dispenser TOTO TS125R bh
92 Tissue Holder TOTO YH116 bh
93 Tissue dispenser bh
94 Floor drain TOTO TX1BN bh
95 Hand Dryer TYC322M bh
96 Gantungan pakaian round 3 bh
97 Mika urinal /mika protector /u57m bh
98 Kitchen Sink Onan 60X45 Kran Angsa bh
99 Pipa PVC AW Wavin 1/2” m¹
100 Pipa PVC AW Wavin 3/4” m¹
101 Pipa PVC AW Wavin 1” m¹
102 Pipa PVC AW Wavin 11/2” m¹
103 Pipa PVC AW Wavin 2” m¹
104 Pipa PVC AW Wavin 21/2” m¹
105 Pipa PVC AW Wavin 3” m¹
106 Pipa PVC AW Wavin 4” m¹
Rp 75,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 200,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 80,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 45,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 4,000,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 35,000
Rp 1,600 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 224,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 265,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 226,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 222,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 358,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 250
Rp 376,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 15,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 37,600
Rp 57,000
Rp 165,000
Rp 7,000,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 3,215,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 4,500,000
Rp 3,100,000
Rp 23,600 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 30,500 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 16,500 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 5,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 12,500 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 850 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 75,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 55,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 55,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 35,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 100,000
Rp 45,000
Rp 30,450
Rp 23,250
Rp 6,700
Rp 32,100
Rp 100,000 Jurnal Harga Satuan Bahan Bangunan Konstruksi & Interior Edisi 37 Tahun 2018
Rp 35,000
Rp 18,000
Rp 14,000
Rp 15,000
Rp 11,000
Rp 11,500 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018 hal. 292
Rp 11,740 https://www.tokopedia.com/stpvc/kabel-nym-3x25mm-3x25mm-supreme-roll100mtr
Rp 19,000 https://www.bukalapak.com/p/rumah-tangga/elektronik-1111/elektronik-lainnya-220/addef2-jual-t-dos-putih-20-mm-cabang-3-kabel-bulat-lubang-
Rp 7,500 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/9fus4v-jual-elbow-e20-pipa-merk-clipsal-pvc-tebal-20mm?blca=SESHO-SHPEL&blp
Rp 870 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/2cg3qr-jual-lasdop-press-penyambung-kabel-ce5-ce-5-6mm-100-pcs?blca=SESHO-SH
Rp 300 https://shopee.co.id/KLEM-PIPA-LISTRIK--KLEM-PIPA-CONDUIT-20MM-i.15297465.1004745149/similar?from=ads&gclid=CjwKCAjw1dzk
Rp 4,500 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/op68yn-jual-inbow-ib-dus-kotak-mangkok-listrik-tanam?blca=SESHO-SHPEL&blpt=S
Rp 22,000 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/2oc8z7-jual-saklar-seri-panasonic?blca=SESHO-SHPEL&blpt=SESHO-SHPEL&gclid
Rp 88,000 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/wxgrvc-jual-promo-philips-downlight-66664-recessed-nickel-rumah-lampu-4?blca=SH
Rp 55,000 https://shopee.co.id/Lampu-Philips-LED-12w-12-watt-i.2622090.1734199281?gclid=Cj0KCQjw8svsBRDqARIsAHKVyqGkME_HFKALbGXZg8
Rp 40,000 https://www.bukalapak.com/p/rumah-tangga/elektronik-1111/stop-kontak/pnd897-jual-hot-sale-stop-kontak-panasonic-cp-single-original?from=pro
Rp 8,000 https://www.tokopedia.com/hope-shoppe/solasi-merk-nitto-seal-tape-listrik-hitam-pvc-insulation-34-x-25-m?m_id=6742231
Rp 120,000
Rp 75,000
Rp 131,700
Rp 1,100
Rp 35,000
Rp 3,900
Rp 376,000 https://www.bukalapak.com/p/industrial/tools/1a178sg-jual-mortice-lock-latch-body-kunci-lidah-rafes-england-sus-304-lk-0892?blca=SESHO-SHIN
Rp 86,931 https://www.lazada.co.id/products/engsel-pintu-stainles-4ecolen-dekson-i464696009-s561058454.html?gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6Dvs
Rp 561,000 https://www.bukalapak.com/p/rumah-tangga/furniture-interior/furniture-lainnya/1btabyu-jual-handle-pintu-roses-rafes-england-sus-304-hr-18-5
Rp 1,600,000 https://www.bukalapak.com/p/rumah-tangga/home-stuff/yypjum-jual-new-pull-handle-deluxe-ph-dl802-38x800x1200mm-sss-handle-pintu-stain
Rp 640,000 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018 hal. 293
Rp 2,550,000 https://www.bukalapak.com/p/elektronik/elektronik-lainnya/d2o5tq-jual-floorhinge-dorma-bts-75?blca=SESHO-SHPEL&blpt=SESHO-SHPEL&g
Rp 925,000 https://www.bukalapak.com/p/rumah-tangga/home-stuff/zdwkxg-jual-patch-fitting-dekson-komplit-pt10-pt20-us10?blca=SEUSC-TESTC&blpt=SE
Rp 870,000 https://www.tokopedia.com/genhardware/dorma-universal-patch-fitting-penjepit-pintu-kaca-pt-30-glass-door?c={campaignId}&m={merchant_id}&
Rp 813,000 https://www.bukalapak.com/p/rumah-tangga/furniture-interior/lemari-1645/q9af0c-jual-engsel-shower-shower-hinge-glass-to-glass-kaca-ke-kaca-d
Rp 145,000 https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/7i8eke-jual-konektor-pipa-fleksibel-dekkson-gh-19-03-glass-holder-tube-conn
Rp 330,000 https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/18guyb1-jual-terbaru-kunci-pintu-kaca-bawah-patch-fitting-ocius-opt10a-us-1
Rp 172,937 https://mitarcahyaabadai.wordpress.com/2017/04/21/harga-pipa-sus-201-ss-304-ss-301-ss-316/
Rp 125,000 https://www.tokopedia.com/genhardware/list-u-stainless-profile-u-shape-stainless-plat-siku-profil-u-sheet
Rp 1,400,000 https://www.tokopedia.com/putrasonna/kaca-cermin-grey-dekorasi-wajik-bevel?c={campaignId}&m={merchant_id}&p={product_id}&ev_efid=E
Rp 925,000 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 96,800 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 160,000 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 275,000 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 255,450 http://uphargabangunan.com/harga-kaca-tempered/
Rp 655,450 http://uphargabangunan.com/harga-kaca-tempered/
Rp 755,450 http://uphargabangunan.com/harga-kaca-tempered/
Rp 3,000,000 https://www.toto.co.id/products/cw637j-sw637jp
Rp 3,270,000 https://www.toto.co.id/products/u57m
Rp 283,000 https://www.toto.co.id/products/thx20nb
Rp 2,430,000 https://www.toto.co.id/products/tx401sb
Rp 1,250,000 https://www.toto.co.id/products/lw592j
Rp 878,000 https://www.toto.co.id/products/tx109lrs
Rp 311,000 https://www.toto.co.id/products/t23b13v7nb
Rp 507,000 https://www.toto.co.id/products/ts125r
Rp 640,000 https://www.toto.co.id/products/yh116
Rp 139,000 https://www.tokopedia.com/masterkitchen77/tempat-tissue-kotak-tissue-gantung-tissue-hand-paper-towel-dispenser
Rp 457,000 https://www.toto.co.id/products/tx1bn
Rp 6,300,000 https://www.toto.co.id/products/tyc322m
Rp 286,000 https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/1hnkrke-jual-gantungan-handuk-gantungan-pakaian-kamar-mandi-round-3?fr
Rp 75,000 https://www.tokopedia.com/300486/mika-urinal-mika-protector-u57m
Rp 1,705,000 https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/19e8svu-jual-sale-paket-komplit-kitchen-sink-onan-60x45-kran-angsa-dan-ha
Rp 5,275 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 8,000 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 9,975 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 16,900 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 21,625 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 31,550 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 44,450 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
Rp 73,650 Jurnal Harga Satuan Bahan Bangunan Edisi 37 Tahun 2018
-mm-cabang-3-kabel-bulat-lubang-20mm-clipsal-tee-dus-premium-ps?blca=SEUSC-TESTC&blpt=SEUSC-TESTC&gclid=CjwKCAjw1dzkBRBWEiwAROVDLB4B-hq97550BFR3bxjYMH
-20mm?blca=SESHO-SHPEL&blpt=SESHO-SHPEL&gclid=CjwKCAjw1dzkBRBWEiwAROVDLJPTnF2QGTRdQ-ZyZOSZ04f77ToIO-L8SsGkV6Q-qQu9S-a9xHnoUxoC-nkQAvD_BwE
e-5-6mm-100-pcs?blca=SESHO-SHPEL&blpt=SESHO-SHPEL&gclid=CjwKCAjw1dzkBRBWEiwAROVDLILpge0QSlIBygv8Nm7OEpa47ulivwLAyerrcDkTKLo6fHVdvwS7ABoCo5UQA
?from=ads&gclid=CjwKCAjw1dzkBRBWEiwAROVDLK1DdPuMuaAnbpcRdNygNWWsandPvxeTC2C74QFoButslBguOnsejRoCqtgQAvD_BwE
anam?blca=SESHO-SHPEL&blpt=SESHO-SHPEL&gclid=CjwKCAjw1dzkBRBWEiwAROVDLD5sowcYUgCi1rI_hBqapLdqVOI1zfCoZwZgJ8W8mEURqCQrDy1KBhoCOHMQAvD_Bw
HPEL&blpt=SESHO-SHPEL&gclid=CjwKCAjw1dzkBRBWEiwAROVDLMEbHcmxbWqQiJviCgqn4z_NL3A83bviHn4bPe0-XeqftkfBfrkjfRoCI4IQAvD_BwE&kpid=go_992207940_5922
sed-nickel-rumah-lampu-4?blca=SHOMP-AWALT&blpt=SHOMP-AWALT&gclid=Cj0KCQjwz8bsBRC6ARIsAEyNnvoXnvnbWd5mB6TQbn2WiXV7KXF93CNKVHjIL35zTvPzgFU6QA
sAHKVyqGkME_HFKALbGXZg8h-XiltnsPV6OlLOhdPAas-cYTt_Aawo18gnRYaAm6KEALw_wcB
nasonic-cp-single-original?from=product-detail§ion=reco&content_type=graph
d-sus-304-lk-0892?blca=SESHO-SHIND&blpt=SESHO-SHIND&gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6AVpB_eHWSNgqp8NTuWoe7Ixw4aC4vYjx6bMvJ7GdLikyBQjxF8J3EaAgJlEALw_wcB&kpid=go_
=Cj0KCQjwyoHlBRCNARIsAFjKJ6DvsQbl-TSPeJlwRMqE7Ly-nGDA1b0j6s13gev620ZI4ERKDNKwYQsaAoqtEALw_wcB&s_kwcid=AL!3155!3!321877371510!!!u!!&exlaz=d_1:mm_150050845_513
oses-rafes-england-sus-304-hr-18-5865?from=list-product&product_owner=normal_seller&search%5Bkeywords%5D=handle%20pintu%20roses%20rafes%20england%20sus%20304%20hr%
00x1200mm-sss-handle-pintu-stainless?blca=SESHO-SHPRT&blpt=SESHO-SHPRT&gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6DlckTc4lT_6GifU4LFho0HG3VrpjOj3jQJBk_w1LJH2Rr8nuCeCF0aAvwKEA
-SHPEL&blpt=SESHO-SHPEL&gclid=Cj0KCQjw7YblBRDFARIsAKkK-dJmuNOdaH2DW2Bqcsp8rffr9JPh_EjG9CXUA19CuY8Ht7U7GO8H3qoaArAfEALw_wcB&kpid=go_99220794
s10?blca=SEUSC-TESTC&blpt=SEUSC-TESTC&gclid=Cj0KCQjw7YblBRDFARIsAKkK-dIyli2wi5iHp6HV6gG0uLr-gdm-VQ91YUASOwWvK6OBpKcaRyW4ZWUaAr-sEALw_wcB
={campaignId}&m={merchant_id}&p={product_id}&ev_efid=Cj0KCQjw7YblBRDFARIsAKkK-dLBRo6GpLf9npP9cob-Y7qLZ3VipSsM1y8Y-jU3RosOM1vBKtrPawYaAjpQEALw_wcB
hinge-glass-to-glass-kaca-ke-kaca-dekson?blca=SEUSC-TESTC&blpt=SEUSC-TESTC&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV_JghaKdBmeyPI9i04M1kdDHGCi8blbW7t1UQJxHX_NX
on-gh-19-03-glass-holder-tube-connector-dekson-penyangga-kaca?blca=SESHO-SHPRT&blpt=SESHO-SHPRT&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV-t7-rloXFpCdPe2hOmJpAyviWj-
wah-patch-fitting-ocius-opt10a-us-10-us10-jd-498?blca=SESHO-SHPRT&blpt=SESHO-SHPRT&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV9WzVwHjwqoZY8gYotwRUGrQnylAjXFaVMrz
nt_id}&p={product_id}&ev_efid=EAIaIQobChMIneLJ5Ly44QIVyCMrCh3o4AnBEAQYASABEgLFqvD_BwE:G:s&ds_rl=1261173&gclid=EAIaIQobChMIneLJ5Ly44QIVyCMrCh3o4AnB
n-pakaian-kamar-mandi-round-3?from=list-product&funnel=omnisearch&product_owner=normal_seller&pos=0&cf=1&sort_origin=termurah&search_sort_default=false&promoted=0
ink-onan-60x45-kran-angsa-dan-handsoap?blca=SEUSC-TESTC&blpt=SEUSC-TESTC&gclid=Cj0KCQjw7YblBRDFARIsAKkK-dK9nxf5bCGJXT501spjb8Fp4xklmb1EiT_gpZwTHrMMk
WEiwAROVDLB4B-hq97550BFR3bxjYMH5m1npFpD0giHOsxkpAM4cDKeEzJxgaghoCen4QAvD_BwE
V6Q-qQu9S-a9xHnoUxoC-nkQAvD_BwE&kpid=go_992207940_59223158865_298253887639_aud-550125406450%3Apla-553996425494_c&sho=59223158865_1o3_992207940_c_90725
LAyerrcDkTKLo6fHVdvwS7ABoCo5UQAvD_BwE&kpid=go_992207940_59223158865_298253887639_aud-550125406450%3Apla-553996425494_c&sho=59223158865_1o3_99220794
W8mEURqCQrDy1KBhoCOHMQAvD_BwE&kpid=go_992207940_59223158865_298253887639_aud-550125406450%3Apla-553996425494_c&sho=59223158865_1o3_992207940_c_907
4IQAvD_BwE&kpid=go_992207940_59223158865_298253887639_aud-550125406450%3Apla-553996425494_c&sho=59223158865_1o5_992207940_c_9072592_g_aud-550125406450%3
WiXV7KXF93CNKVHjIL35zTvPzgFU6QAp-rs4aAuDgEALw_wcB&sho=48038234813_1o7_974136221_c_9072592_g_aud-550125405770%3Apla-390290811332
GdLikyBQjxF8J3EaAgJlEALw_wcB&kpid=go_1626143967_73847193068_325980949885_aud-550125407010%3Apla-672242613025_c&sho=73847193068_1o1_1626143967_c_9072592_g_
510!!!u!!&exlaz=d_1:mm_150050845_51350205_2010350205::12:1667026050!69975702128!!!pla-368660641166!c!368660641166!561058454!128280640&ef_id=WxDF-AAAAL9C22jc:20
20rafes%20england%20sus%20304%20hr%2018%205865
VrpjOj3jQJBk_w1LJH2Rr8nuCeCF0aAvwKEALw_wcB&kpid=go_992207883_47246373577_234395164217_aud-550125405810%3Apla-580014101014_c&sho=47246373577_1o6_992207883
qoaArAfEALw_wcB&kpid=go_992207940_59223158865_298253887639_aud-550125407010%3Apla-553996425494_c&sho=59223158865_1o2_992207940_c_9072592_g_aud-550125407
K6OBpKcaRyW4ZWUaAr-sEALw_wcB
U3RosOM1vBKtrPawYaAjpQEALw_wcB:G:s&ds_rl=1261173&gclid=Cj0KCQjw7YblBRDFARIsAKkK-dLBRo6GpLf9npP9cob-Y7qLZ3VipSsM1y8Y-jU3RosOM1vBKtrPawYaAjpQEA
I9i04M1kdDHGCi8blbW7t1UQJxHX_NXG6u3ALMcpIaAtOtEALw_wcB
ABgXqV-t7-rloXFpCdPe2hOmJpAyviWj-PxdCkEkPA5V-cg5-rQW0LH8q7AaAl4WEALw_wcB&kpid=go_992207883_47246373577_234395164217_aud-550125405810%3Apla-5800141
wHjwqoZY8gYotwRUGrQnylAjXFaVMrzEf8keatxNr0Fit86OgaAtWhEALw_wcB&kpid=go_992207883_47246373577_234395164217_aud-550125405810%3Apla-580014101014_c&sho=
IQobChMIneLJ5Ly44QIVyCMrCh3o4AnBEAQYASABEgLFqvD_BwE&gclsrc=aw.ds&ef_id=WxDF-AAAAL9C22jc:20190405075452:s
rch_sort_default=false&promoted=0
XT501spjb8Fp4xklmb1EiT_gpZwTHrMMkqMVQBmfJ2IaAl90EALw_wcB
58865_1o3_992207940_c_9072592_g_aud-550125406450%3Apla-553996425494
ho=59223158865_1o3_992207940_c_9072592_g_aud-550125406450%3Apla-553996425494
3158865_1o3_992207940_c_9072592_g_aud-550125406450%3Apla-553996425494
072592_g_aud-550125406450%3Apla-553996425494
o1_1626143967_c_9072592_g_aud-550125407010%3Apla-672242613025
0&ef_id=WxDF-AAAAL9C22jc:20190401034556:s
=47246373577_1o6_992207883_c_9072592_g_aud-550125405810%3Apla-580014101014
40_c_9072592_g_aud-550125407010%3Apla-553996425494
U3RosOM1vBKtrPawYaAjpQEALw_wcB&gclsrc=aw.ds&ef_id=WxDF-AAAAL9C22jc:20190402035420:s
550125405810%3Apla-580014101014_c&sho=47246373577_1o2_992207883_c_9072592_g_aud-550125405810%3Apla-580014101014
0%3Apla-580014101014_c&sho=47246373577_1o2_992207883_c_9072592_g_aud-550125405810%3Apla-580014101014
PEKERJAAN PEMBONGKARAN
Pekerjaan pembongkaran lantai eksisting
Lantai 1
- Teras 16.13
- Lobby 30.00
- Ruang Kepala 34.00
- Toilet Kepala 4.73
- Ruang Petugas Sekuriti 9.90
- Ruang Tata Usaha 9.70
- Ruang Pengukuran Kapal dan Koridor 29.90
- Proses Pelayanan 51.90
- Fasilitas Pelabuhan 18.10
- Bendahara Penerimaan 13.20
- Bendahara Pengeluaran 10.30
- Bendahara Material 7.80
- Gudang Bendahara Material 15.00
- Gudang Arsip dan Kamar Tidur 40.30
- Area Tangga 8.54 25.01 0.16 12.54
Lantai 2
- Ruang Rapat 41.40
- Gudang 16.60
- Kamar Mandi 2.40
AREA TUNGGU
a. Pekerjaan Lantai
- Pekerjaan plur lantai 82.30
- Pemasangan lantai granite tile 82.30
b. Pekerjaan Dinding
- Pemasangan ring balok 5.11 0.15 0.20 0.15
- Pemasangan kolom praktis 10.20 0.15 0.15 0.23
- Pemasangan sloof 4.56 0.15 0.20 0.14
- Pemasangan dinding bata 1.85 0.72 2.76 7.53 12.85
pintu bend jendela b openingan kaca outdoor
- Acian 25.70
- Plesteran 25.70
- Pemasangan plint granite tile 41.60 5.40 36.20
- Pemasangan wallpaper 41.60 3.00 19.82 104.98
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 82.30
- Pemasangan drop plafond tipe 1 30.80
- Pemasangan drop plafond tipe 2 37.82
- Pemasangan list tidur tipe 1 24.42 48.84
- List plafond siku 38.80
d. Pekerjaan Pengecatan
- Pengecatan plafond 82.30
- Pengecatan drop plafond 68.62
RUANG PPID
a. Pekerjaan Lantai
- Pekerjaan plur lantai 4.82
- Pemasangan lantai granite tile 4.82
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2.90 3.10 2.16 6.83
- Pemasangan plint granite tile 9.12 1.80 7.32
- Pemasangan wallpaper 9.12 3.10 4.32 23.95
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.82
- List plafond siku 9.12
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.82
RUANG LAKTASI
a. Pekerjaan Lantai
- Pekerjaan plur lantai 4.80
- Pemasangan lantai granite tile 4.80
b. Pekerjaan Dinding
- Pemasangan plint granite tile 12.30 0.90 11.40
- Pemasangan wallpaper 12.30 3.10 3.60 34.53
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.80
- List plafond siku 12.30
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.80
RUANG KONSULTASI
a. Pekerjaan Lantai
- Pekerjaan plur lantai 9.70
- Pemasangan lantai granite tile 9.70
b. Pekerjaan Dinding
- Pemasangan plint granite tile 12.60 0.90 11.70
- Pemasangan wallpaper 12.60 3.10 3.92 35.14
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 9.70
- Pemasangan drop plafond tipe 1 8.90
- List plafond siku 12.60
d. Pekerjaan Pengecatan
- Pengecatan plafond 9.70
- Pengecatan drop plafond 8.90
RUANG KAKEL
a. Pekerjaan Lantai
- Pekerjaan plur lantai 8.00
- Pemasangan lantai granite tile 8.00
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 5.67 3.10 2.16 15.42
- Pemasangan plint granite tile 11.70 0.90 10.80
- Pemasangan wallpaper 11.70 3.10 2.16 34.11
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 8.00
- Pemasangan drop plafond tipe 1 3.20
- List plafond siku 11.70
d. Pekerjaan Pengecatan
- Pengecatan plafond 8.00
- Pengecatan drop plafond 3.20
BENDAHARA MATERIAL
a. Pekerjaan Lantai
- Pekerjaan plur lantai 16.30
- Pemasangan lantai granite tile 16.30
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 4.70 3.10 2.16 12.41
- Pemasangan plint granite tile 17.83 0.90 16.93
- Pemasangan wallpaper 17.83 3.10 2.16 53.11
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 16.30
- Pemasangan drop plafond tipe 1 4.70
- Pemasangan drop plafond tipe 2 7.28
- List plafond siku 17.83
d. Pekerjaan Pengecatan
- Pengecatan plafond 16.30
- Pengecatan drop plafond 11.98
GUDANG ARSIP
a. Pekerjaan Lantai
- Pekerjaan plur lantai 41.10
- Pemasangan lantai granite tile 41.10
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 6.90 3.10 21.39
- Pemasangan plint granite tile 34.60 0.90 33.70
- Pemasangan wallpaper 34.60 3.10 2.16 105.10
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 41.10
- List plafond siku 34.60
d. Pekerjaan Pengecatan
- Pengecatan plafond 41.10
AREA TANGGA
a. Pekerjaan Lantai
- Pekerjaan plur lantai 8.54 25.01 0.16 12.54
- Pemasangan lantai granite tile 12.54
b. Pekerjaan Dinding
- Pemasangan railing tangga 2.72 0.80 3.60 4.20 11.32
- Pemasangan plint granite tile 4.10 3.30 5.70 4.20 17.30
LANTAI 2
BENDAHARA PENERIMAAN
a. Pekerjaan Lantai
- Pekerjaan plur lantai 13.20
- Pemasangan lantai granite tile 13.20
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 6.10 3.10 2.16 16.75
- Pemasangan plint granite tile 16.90 0.90 16.00
- Pemasangan wallpaper 16.90 3.10 2.16 50.23
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 13.20
- Pemasangan drop plafond tipe 1 4.90
- Pemasangan drop plafond tipe 2 9.30
- List plafond siku 16.90
d. Pekerjaan Pengecatan
- Pengecatan plafond 13.20
- Pengecatan drop plafond 14.20
BENDAHARA PENGELUARAN
a. Pekerjaan Lantai
- Pekerjaan plur lantai 14.60
- Pemasangan lantai granite tile 14.60
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 4.90 3.10 2.16 13.03
- Pemasangan plint granite tile 17.20 0.90 16.30
- Pemasangan wallpaper 17.20 3.10 2.16 51.16
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 14.60
- Pemasangan drop plafond tipe 1 3.00
- Pemasangan drop plafond tipe 2 12.60
- List plafond siku 17.20
d. Pekerjaan Pengecatan
- Pengecatan plafond 14.60
- Pengecatan drop plafond 15.60
RUANG TU
a. Pekerjaan Lantai
- Pekerjaan plur lantai 14.60
- Pemasangan lantai granite tile 14.60
b. Pekerjaan Dinding
- Pemasangan partisi gypsum rangka hollow 2 3.35 3.10 2.16 8.23
- Pemasangan plint granite tile 16.00 0.90 15.10
- Pemasangan wallpaper 16.00 3.10 2.16 47.44
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 14.60
- Pemasangan drop plafond tipe 1 10.61
- Pemasangan drop plafond tipe 2 6.80
- List plafond siku 16.00
d. Pekerjaan Pengecatan
- Pengecatan plafond 14.60
- Pengecatan drop plafond 17.41
FOYER
a. Pekerjaan Lantai
- Pekerjaan plur lantai 22.30
- Pemasangan lantai granite tile 22.30
b. Pekerjaan Dinding
- Pemasangan plint granite tile 25.10 7.25 17.85
- Pemasangan wallpaper 24.70 3.10 2.65 15.96 63.26
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 27.80
- Pemasangan drop plafond tipe 1 12.30
- Pemasangan drop plafond tipe 2 13.30
- List plafond siku 21.90
d. Pekerjaan Pengecatan
- Pengecatan plafond 27.80
- Pengecatan drop plafond 25.60
RUANG RAPAT
a. Pekerjaan Lantai
- Pekerjaan plur lantai 76.20
Pemasangan lantai karpet tile berikut
- 76.20
underlayer
b. Pekerjaan Dinding
- Pemasangan ring balok 19.50 0.15 0.20 0.59
- Pemasangan kolom praktis 22.10 0.15 0.15 0.50
- Pemasangan sloof 19.50 0.15 0.20 0.59
- Pemasangan dinding bata 19.50 3.40 6.16 60.14
- Acian 120.28
- Plesteran 120.28
- Partisi gypsum 10.20 3.10 8.64 22.98
- Pemasangan plint kayu fin. Melamic 38.80 38.80
- Pemasangan wallpaper 38.80 3.00 116.40
- Pemasangan bukaan jendela 6.24
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 76.20
- Pemasangan/penggantian plafond, bahan tripl 12.00 12.00
- Pemasangan drop plafond tipe 1 35.60 38.80 5.00 79.40
- Pemasangan drop plafond tipe 2 57.00 60.60 117.60
- Pemasangan drop plafond tipe 5 4.46
- List plafond siku minimalis 1.82 2.74 4.56
d. Pekerjaan Pengecatan
- Pengecatan plafond 64.20
- Pengecatan drop plafond 201.46
TOILET LANTAI 2
a. Pekerjaan Lantai
- Pekerjaan plur lantai 4.60
- Pemasangan lantai granite tile 4.60
b. Pekerjaan Dinding
- Pemasangan ring balok 1.43 0.15 0.20 0.04
- Pemasangan kolom praktis 3.40 0.15 0.15 0.08
- Pemasangan sloof 0.63 0.15 0.20 0.02
- Pemasangan dinding bata 1.43 3.40 1.92 2.94
- Acian 5.88
- Plesteran 5.88
- Pemasangan keramik dinding, uk. 30 x 60 c 9.00 3.00 1.92 25.08
- Pemasangan bukaan pintu 5.60
c. Pekerjaan Plafond
- Pemasangan/penggantian plafond, bahan gypsum rangka hollow 4.60
- List plafond siku 9.00
d. Pekerjaan Pengecatan
- Pengecatan plafond 4.60
g. Pekerjaan Furniture
- Pemasangan meja beton 0.66
- Finishing granite tile untuk meja wastafel 1.64 0.10 0.16
pintu
pintu gandeng ruangan
303.5016
60.4
4.94
loket
0.29
0.29
0.58
6.19
janggutan tangga
0.48
0.98
2.47
0.47
0.75
0.79
0.88
0.88
1.34
area tangga
2.63
4.57
0.51
0.28
opening lobby utama
2.744 2.061 5.655384
2.744 0.787 2.159528
2.86 2.1 6.006 pintu PPID
5.8 3.5 20.3 pintu utama dan partisi kaca
34.1209
opening tampak kanan
0.8 2.1 3.36 pintu WC
2.1 2.7 5.67 pintu PTSA
0.9 2.1 1.89 pintu atm
0.9 2.1 1.89 pintu pelayanan
2.1 0.8 1.68 loket pelayanan
14.49
kode
PKY1
PKY2
WT1
WT2
WT4
WT5
WT6
WT7
WT7a
WT8
WT9
WT10
WT11
WT12
WT13
FF1
FF2
FF3
FF4
FF5
FF6
FT1
FT2
FT3
CL-2
CL-3
keterangan
Pintu kayu fin. HPL dengan kusen kayu solid 1 daun pintu, uk. 80 x 240 cm dengan door closer, lengkap
dengan aksesoris (PKY1)
Pintu kayu kombinasi kaca dengan kusen kayu solid 2 daun pintu, uk. 135 x 240 cm dengan sticker
sandblast dan door closer, lengkap dengan aksesoris (PKY2)
Gawangan pintu utama ruang tunggu, marmer import Italy (WT1)
Panel kayu kombinasi cermin untuk cover kolom ruang tunggu (WT2)
Gawangan kayu ruang rapat, marmer import Italy kombinasi kayu (WT4)
Panel TV ruang pimpinan, kayu fin. HPL motif kayu dan motif marmer (WT5)
Panel kayu kombinasi stainless untuk cover kolom ruang pimpinan, dengan lampu indirect (WT6)
Panel kayu kombinasi stainless untuk cover kolom ruang rapat, dengan lampu indirect (WT7)
Panel kayu kombinasi stainless untuk cover kolom ruang rapat (setengah sisi), dengan lampu indirect
(WT7a)
Panel kayu fin. HPL motif marmer dengan list stainless, dan glasstone super white ruang pimpinan (WT8)
Pintu kamuflase dan panel kayu fin. HPL ruang rapat (WT9)
Credenza kayu fin. HPL dengan top solid surface. Kiri dan kanan credenza tiang2 kayu fin. HPL (WT10)
Panel kayu fin. HPL kombinasi panel MDF cutting laser fin. Duco dengan lampu indirect (WT11)
Panel kayu fin. Wallpaper list stainless untuk background TV, bagian kanan dan kiri credenza dan rak2
kayu fin. HPL motif kayu dan motif marmer dengan lampu indirect (WT12)
Panel glasstone super white kombinasi kayu fin. HPL, bagian kanan dan kiri credenza dan rak2 kayu fin.
HPL motif kayu dan motif marmer dengan lampu indirect (WT13)
Loket pelayanan dan meja counter petugas, kombinasi kayu fin. HPL dan motif marmer, dengan top meja
marmer Italy import (FF1)
Lemari bawah tangga, kayu fin. HPL (FF2)
Lemari filing ruang pimpinan, kayu fin. HPL motif kayu dan motif marmer (FF3)
Meja kerja dan meja samping pimpinan, kayu fin. HPL (FF4)
Meja rapat pimpinan, kayu fin. HPL dengan kaki besi (FF5)
Lemari filing gantung staff, kayu fin. HPL (FF6)
Ban penutup pipa wastafel toilet staff lantai 1 (FT1)
Ban penutup pipa wastafel toilet lantai 2 (FT2)
Ban penutup pipa wastafel toilet pimpinan (FT3)
Detail plafond ruang pimpinan (CL-2)
Detail plafond ruang rapat (CL-3)
stiker closer handle
no y pull 1 (60cm)
A.2.2.1.14. (3) Pembongkaran 1 m² Rangka dan plafound, lampu dan instalasi kabel eksisting
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.2000 Rp 74,400
Mandor oh 0.0100 Rp 110,000
Jumlah Tenaga Kerja
B Bahan Rp -
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.2.2.1.14. (5) Pembongkaran 1 unit pembongkaran kusen dan pintu serta jendela eksisting
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.7000 Rp 74,400
Mandor oh 0.0350 Rp 110,000
Jumlah Tenaga Kerja
B Bahan Rp -
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
CATATAN: Bobot isi pasir = 1400 kg/m3, Bobot isi kerikil = 1350 kg/m3, Buckling factor pasir = 20%
A.4.2.1.13. (1)
Pemasangan 1 Unit Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 210 cm dengan sticker sandblast, lengkap dengan aksesoris (PA1)
- Kusen pintu aluminium m' 6.0000 Rp 181,656
- Frame pintu Aluminium m' 6.0000 Rp 209,495
- Kaca 5 mm m² 1.8900 Rp 161,869
- Engsel pintu set 2.0000 Rp 146,367
- Kunci Pintu bh 1.0000 Rp 567,272
- Lever Handle set 1.0000 Rp 685,200
- Stiker Sanblast m² 1.8900 Rp 150,000
A.4.2.1.13. (2) Pemasangan 1 Unit Pintu kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 210 cm dengan sticker sandblast dan door closer, lengkap dengan aksesoris
(PA1d)
- Kusen pintu aluminium m' 6.0000 Rp 181,656
- Frame pintu Aluminium m' 6.0000 Rp 209,495
- Kaca 5 mm m² 1.8900 Rp 161,869
- Engsel pintu set 2.0000 Rp 146,367
- Kunci Pintu bh 1.0000 Rp 567,272
- Pull Handle set 1.0000 Rp 1,932,000
- Door Closer bh 1.0000 Rp 906,235
- Stiker Sanblast m² 1.8900 Rp 150,000
A.4.2.1.12.(3) Pemasangan 1 Unit Pintu aluminium 1 daun pintu, uk. 80 x 210 cm dengan plat aluminium, lengkap dengan aksesoris (PA2)
- Kusen Pintu Aluminium m' 5.8000 Rp 181,656
- Plat Aluminium m² 1.6800 Rp 460,680
- Engsel Pintu set 2.0000 Rp 146,367
- Lever Handle set 1.0000 Rp 685,200
- Kunci set 1.0000 Rp 567,272
A.4.2.1.12.(3.1) Pemasangan 1 Unit Pintu aluminium 1 daun pintu, uk. 90 x 210 cm dengan plat aluminium, lengkap dengan aksesoris (PA3)
- Kusen Pintu Aluminium m' 6.0000 Rp 181,656
- Plat Aluminium m² 1.6800 Rp 460,680
- Engsel Pintu set 2.0000 Rp 146,367
- Lever Handle set 1.0000 Rp 685,200
- Kunci set 1.0000 Rp 567,272
A.4.2.1.12.(4) Pemasangan 1 Unit Pintu sliding kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 90 x 210 cm dengan sticker sandblast, lengkap dengan aksesoris (PA4)
- Kusen Pintu Aluminium m' 6.0000 Rp 181,656
- Frame Pintu aluminium m' 6.0000 Rp 209,495
- Kaca Polos 5mm m² 1.8900 Rp 161,869
- Rell Sledeng set 1.0000 Rp 1,294,649
- Kunci Pintu bh 1.0000 Rp 567,272
- Pull Handle set 1.0000 Rp 1,932,000
- Stiker Sanblast m² 1.8900 Rp 150,000
A.4.2.1.12.(5) Pemasangan 1 Unit Pintu kaca temperred frameless 2 daun pintu, uk. 160 x 245 cm, dengan sticker digital printing, lengkap dengan aksesoris (PK1)
- Kaca Tempered 12 mm m² 3.9200 Rp 3,454,180
- Gosok mesin m' 16.2000 Rp 48,000
- Coak kaca pcs 6.0000 Rp 142,800
- Bor kaca (lubang) lubang 8.0000 Rp 60,000
- Florhings set 2.0000 Rp 3,060,000
- Patch Fitting PT10, PT20, PT24, US 10 Set 2.0000 Rp 1,110,000
- Pull Handle Stainless steel SUS 304 Set 2.0000 Rp 1,932,000
- Sticker digital printing cm 33600 Rp 78
A.4.2.1.12.(6) Pemasangan 1 Unit Pintu kaca temperred frameless 1 daun pintu, uk. 90 x 210 cm, lengkap dengan aksesoris (PK2)
- Kaca Tempered 12 mm m² 1.8900 Rp 3,454,180
- Gosok mesin m' 6.0000 Rp 48,000
- Coak kaca pcs 3.0000 Rp 142,800
- Bor kaca (lubang) pcs 4.0000 Rp 60,000
- Florhings set 1.0000 Rp 3,060,000
- Patch Fitting PT10, PT20, PT24, US 10 Set 1.0000 Rp 1,110,000
- Pull Handle Stainless steel SUS 304 Set 1.0000 Rp 1,932,000
A.4.2.1.12.(7) Pemasangan 1 Unit Pintu 1 daun pintu dan partisi kaca temperred frameless, uk. 199 x 210 cm, lengkap dengan aksesoris (PK3)
- Kaca Tempered 12 mm m² 4.1790 Rp 3,454,180
- Gosok mesin m' 15.5000 Rp 48,000
- Coak kaca pcs 3.0000 Rp 142,800
- Bor kaca (lubang) lubang 4.0000 Rp 60,000
- Florhings set 1.0000 Rp 3,060,000
- Patch Fitting PT10, PT20, PT24, US 10 Set 1.0000 Rp 1,110,000
- Pull Handle Stainless steel SUS 304 Set 1.0000 Rp 1,932,000
- Sticker digital printing cm 41790 Rp 78
- U chanel 19 mm m' 4.2000 Rp 150,000
A.4.2.1.12.(8) Pemasangan 1 Unit Pintu kaca temperred frameless 1 daun pintu, uk. 80 x 210 cm, bagian atas kaca mati 80 x 95 cm lengkap dengan aksesoris (PK4)
- Kaca Tempered 12 mm m² 2.4400 Rp 3,454,180
- Gosok mesin m' 9.0000 Rp 48,000
- Coak kaca pcs 4.0000 Rp 142,800
- Bor kaca (lubang) lubang 5.0000 Rp 60,000
- Florhings set 1.0000 Rp 3,060,000
- Patch Fitting PT10, PT20, PT24, US 10 Set 1.0000 Rp 1,110,000
- Pull Handle Stainless steel SUS 304 Set 1.0000 Rp 1,932,000
- U chanel 19 mm m' 3.0000 Rp 150,000
- Path fitting PT30 pcs 1.0000 Rp 1,044,000
A.4.2.1.12.(9) Pemasangan 1 Unit Pintu gandeng kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 230 x 210 cm dengan sticker sandblast dan door closer, lengkap
dengan aksesoris (PG1)
- Kusen pintu aluminium 3" m' 11.6000 Rp 181,656
- Frame pintu aluminium m' 6.0000 Rp 209,495
- Kaca 5 mm m² 4.8300 Rp 161,869
- Engsel pintu pcs 2.0000 Rp 146,367
- Kunci pintu set 1.0000 Rp 567,272
- Pull Handle Stainless steel SUS 304 set 1.0000 Rp 1,932,000
- Sealent tube 0.1250 Rp 57,960
- Door Closer set 1.0000 Rp 906,235
- Sticker Sanblast m² 4.8300 Rp 150,000
A.4.2.1.12.(10) Pemasangan 1 Unit Pintu gandeng kaca dengan frame dan kusen aluminium 1 daun pintu, uk. 286 x 210 cm dengan sticker sandblast dan door closer, lengkap
dengan aksesoris (PG2)
- Kusen pintu aluminium 3" m' 13.6000 Rp 181,656
- Frame pintu aluminium m' 8.0000 Rp 209,495
- Kaca 5 mm m² 6.0060 Rp 161,869
- Engsel pintu pcs 2.0000 Rp 146,367
- Kunci pintu set 1.0000 Rp 567,272
- Pull Handle Stainless steel SUS 304 set 1.0000 Rp 1,932,000
- Sealent tube 0.1250 Rp 57,960
- Door Closer set 1.0000 Rp 906,235
- Sticker Sanblast m² 6.0060 Rp 150,000
A.4.2.1.12.(11) Pemasangan 1 Unit Partisi kubikal dengan 1 pintu fin. HPL dengan edging stainless, uk. 108 x 200 cm (KB1)
- Kaca Tempered m² 2.1600 Rp 3,454,180
- Gosok mesin m' 10.1200 Rp 48,000
- Coak kaca pcs 2.0000 Rp 142,800
- Bor kaca (lubang) pcs 6.0000 Rp 60,000
- cubicle Fit Rafes pcs 2.0000 Rp 539,000
- kunci glass to glass Ociuss set 1.0000 Rp 455,000
- stiker white m² 2.1600 Rp 150,000
- pipa stainless stell 1mmx1" SUS 304 m' 1.0800 Rp 294,000
- glass holder Dekson pcs 4.0000 Rp 175,000
- engsel glass to glass Dekson set 2.0000 Rp 1,617,000
- clip seal btg 2.0000 Rp 130,900
- handle handuk 15x45cm Dekson set 1.0000 Rp 1,001,000
- Sealent tube 0.1429 Rp 57,960
A.4.2.1.12.(12) Pemasangan 1 Unit Partisi kubikal dengan 2 pintu fin. HPL dengan edging stainless, uk. 195+148 x 200 cm (KB2)
- Kaca Tempered m² 6.8600 Rp 3,454,180
- Gosok mesin m' 27.4300 Rp 48,000
- Coak kaca pcs 4.0000 Rp 142,800
- Bor kaca (lubang) pcs 12.0000 Rp 60,000
- cubicle Fit Rafes pcs 8.0000 Rp 539,000
- kunci glass to glass Ociuss set 2.0000 Rp 455,000
- stiker white m² 6.8600 Rp 150,000
- pipa stainless stell 1mmx1" SUS 304 m' 3.4000 Rp 294,000
- glass holder Dekson pcs 10.0000 Rp 175,000
- engsel glass to glass Dekson set 4.0000 Rp 1,617,000
- clip seal btg 4.0000 Rp 130,900
- handle handuk 15x45cm Dekson set 2.0000 Rp 1,001,000
- Sealent tube 0.2000 Rp 57,960
A.4.2.1.12.(13) Pemasangan 1 Unit Partisi kubikal dengan 1 daun pintu fin. HPL dengan edging stainless, uk. 152 x 200 cm (KB3)
- Kaca Tempered m² 3.0400 Rp 3,454,180
- Gosok mesin m' 11.0000 Rp 48,000
- Coak kaca pcs 2.0000 Rp 142,800
- Bor kaca (lubang) pcs 6.0000 Rp 60,000
- cubicle Fit Rafes pcs 2.0000 Rp 539,000
- kunci glass to glass Ociuss set 1.0000 Rp 455,000
- stiker white m² 3.0400 Rp 150,000
- pipa stainless stell 1mmx1" SUS 304 m' 1.5000 Rp 294,000
- glass holder Dekson pcs 4.0000 Rp 175,000
- engsel glass to glass Dekson set 2.0000 Rp 1,617,000
- clip seal btg 2.0000 Rp 130,900
- handle handuk 15x45cm Dekson set 1.0000 Rp 1,001,000
- Sealent tube 0.1667 Rp 57,960
A.4.2.1.12.(14) Pemasangan 1 Unit Jendela kaca dengan kusen aluminium, uk. 742 x 110 cm, dengan sticker sandblast (JA1)
- Kusen aluminium m' 31.4000 Rp 181,656
- Frame Aluminium m' 31.4000 Rp 209,495
- Kaca Polos 5 mm m² 8.1620 Rp 161,869
- Sticker Sanblast m² 8.1620 Rp 150,000
- Sealent tube 2.0000 Rp 57,960
A.4.2.1.12.(14.1) Pemasangan 1 Unit Jendela kaca dengan kusen aluminium, uk. 742 x 110 cm, dengan sticker oneway (JA1-2)
- Kusen aluminium m' 31.4000 Rp 181,656
- Frame Aluminium m' 31.4000 Rp 209,495
- Kaca Polos 5 mm m² 8.1620 Rp 161,869
- Sticker Ohneway m² 8.1620 Rp 175,000
- Sealent tube 2.0000 Rp 57,960
A.4.2.1.12.(15) Pemasangan 1 Unit Jendela kaca dengan kusen aluminium, uk. 500 x 100 cm, dengan sticker sandblast (JA2)
- Kusen aluminium m' 20.0000 Rp 181,656
- Frame Aluminium m' 20.0000 Rp 209,495
- Kaca Polos 5 mm m² 6.5560 Rp 161,869
- Sticker Sanblast m² 6.5560 Rp 150,000
- Sealent tube 1.0000 Rp 57,960
A.4.2.1.12.(16) Pemasangan 1 Unit Partisi kaca temperred frameless 10mm, uk. 85+95 x 200 cm, dengan sticker sandblast (K1)
- Kaca Tempered m² 4.5000 Rp 3,454,180
- Gosok mesin m' 17.6000 Rp 48,000
- Sticker Sanblast m² 4.5000 Rp 150,000
A.4.2.1.12.(17) Pemasangan 1 Unit Partisi kaca temperred frameless 10mm, uk. 288 x 210+95 cm, dengan sticker sandblast (K2)
- Kaca Tempered m² 8.7840 Rp 3,454,180
- Gosok mesin m' 26.8000 Rp 48,000
- Sticker Sanblast m² 8.7840 Rp 150,000
A.4.2.1.12.(18) Pemasangan 1 Unit Pembatas urinoir, kaca laminate double 5mm dengan kombinasi sticker sandblast, uk. 40 x 150 cm (FF7)
- Kaca Laminate 5+5 mm m² 0.6000 Rp 1,750,000
- Gosok mesin m' 3.8000 Rp 48,000
- Uchanel Stainless Steel m' 2.0000 Rp 150,000
A.4.2.1.20. (2) Pemasangan 1 m² Dinding Partisi 2 sisi Bahan Gypsum Rangka Hollow
A Tenaga
Pekerja oh 0.400 Rp 74,400
Tukang oh 0.300 Rp 93,600
Kepala Tukang oh 0.060 Rp 100,000
Mandor oh 0.006 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Gypsum 9 mm lbr 0.694 Rp 101,520
Besi Hollow 4/4 btg 1.200 #NAME?
Besi Hollow 2/4 btg 1.200 #NAME?
Cornice Compound sak 0.270 Rp 108,600
Cornice Compound kg 0.100 Rp 66,000
Kain Plester rol 0.300 Rp 20,040
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (3) Pemasangan 1 m² plafond rangka hollow bahan gipsum berikut perkuatan
A TENAGA
Pekerja oh 0.200 Rp 74,400
Tukang oh 0.350 Rp 93,600
Kepala Tukang oh 0.100 Rp 100,000
Mandor oh 0.010 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.347 Rp 101,520
Besi Hollow 4/4 btg 1.250 #NAME?
Besi Hollow 2/4 btg 1.250 #NAME?
Cornice Compound Sak 0.260 Rp 108,600
Kain plester rol 0.300 Rp 20,040
Skrup Gypsum kg 0.300 Rp 66,000
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (4) Pemasangan 1 m² plafond rangka hollow dasaran multipleks 9 mm finishing Kaca Gray berikut perkuatan
A TENAGA
Pekerja oh 0.200 Rp 74,400
Tukang oh 0.350 Rp 93,600
Kepala Tukang oh 0.100 Rp 100,000
Mandor oh 0.010 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Dasaran Multipleks 9 mm lbr 0.347 Rp 223,920
Kaca Gray m² 1.000 Rp 1,680,000
Besi Hollow 4/4 btg 1.250 #NAME?
Besi Hollow 2/4 btg 1.250 #NAME?
Sealent Sak 0.260 Rp 57,960
Skrup Gypsum kg 0.260 Rp 66,000
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (5) Pemasangan 1 m² plafond panel 3D fin. Duco
A TENAGA
Pekerja oh 0.200 Rp 74,400
Tukang oh 0.350 Rp 93,600
Kepala Tukang oh 0.100 Rp 100,000
Mandor oh 0.010 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
plafond panel 3D fin. Duco m² 1.000 Rp 2,375,000
Besi Hollow 4/4 btg 1.250 #NAME?
Besi Hollow 2/4 btg 1.250 #NAME?
Skrup Gypsum kg 0.260 Rp 66,000
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (6) Pemasangan 1 m drop plafond rangka hollow bahan gypsum berikut perkuatan type I
A TENAGA
Pekerja oh 0.060 Rp 74,400
Tukang oh 0.040 Rp 93,600
Kepala Tukang oh 0.050 Rp 100,000
Mandor oh 0.003 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.017 Rp 101,520
Besi Hollow 4/4 btg 0.100 #NAME?
Besi Hollow 2/4 btg 0.100 #NAME?
Cornice Compound Sak 0.014 Rp 108,600
Skrup Gypsum kg 0.033 #NAME?
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (7) Pemasangan 1 m drop plafond rangka hollow bahan gypsum berikut perkuatan type II
A TENAGA
Pekerja oh 0.120 Rp 74,400
Tukang oh 0.080 Rp 93,600
Kepala Tukang oh 0.100 Rp 100,000
Mandor oh 0.006 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.080 Rp 101,520
Besi Hollow 4/4 btg 0.200 #NAME?
Besi Hollow 2/4 btg 0.200 #NAME?
Cornice Compound Sak 0.029 Rp 108,600
Skrup Gypsum kg 0.067 #NAME?
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (8) Pemasangan 1 m drop plafond rangka hollow bahan gypsum berikut perkuatan type III
A TENAGA
Pekerja oh 0.060 Rp 74,400
Tukang oh 0.040 Rp 93,600
Kepala Tukang oh 0.050 Rp 100,000
Mandor oh 0.003 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.052 Rp 101,520
Besi Hollow 4/4 btg 0.100 #NAME?
Besi Hollow 2/4 btg 0.100 #NAME?
Cornice Compound Sak 0.014 Rp 108,600
Skrup Gypsum kg 0.033 #NAME?
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (9) Pemasangan 1 m drop plafond rangka hollow bahan gypsum berikut perkuatan type IV
A TENAGA
Pekerja oh 0.200 Rp 74,400
Tukang oh 0.100 Rp 93,600
Kepala Tukang oh 0.033 Rp 100,000
Mandor oh 0.010 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.132 Rp 101,520
Besi Hollow 4/4 btg 0.300 #NAME?
Besi Hollow 2/4 btg 0.300 #NAME?
Cornice Compound Sak 0.029 Rp 108,600
Skrup Gypsum kg 0.067 #NAME?
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.20. (10) Pemasangan 1 m drop plafond rangka hollow bahan gypsum berikut perkuatan type V
A TENAGA
Pekerja oh 0.120 Rp 74,400
Tukang oh 0.080 Rp 93,600
Kepala Tukang oh 0.100 Rp 100,000
Mandor oh 0.006 Rp 110,000
Jumlah Tenaga Kerja
B BAHAN
Gypsum 9 mm lbr 0.097 Rp 101,520
Besi Hollow 4/4 btg 0.200 #NAME?
Besi Hollow 2/4 btg 0.200 #NAME?
Cornice Compound Sak 0.040 Rp 108,600
Skrup Gypsum kg 0.033 #NAME?
Jumlah Harga Bahan
C PERALATAN Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.2.1.22. (1) (K3) Pemasangan 1 m² Rangka Atap Kaca Laminate bahan Stainles Steel SUS 304
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.7604 Rp 74,400
Tukang Besi oh 0.7604 Rp 93,600
Kepala Tukang oh 0.0760 Rp 100,000
Mandor oh 0.0380 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Rangka Atap Stainless Steel 5 x 100 SUS 304 m¹ 1.0000 Rp 1,225,000
Jumlah Harga Bahan
C Peralatan Rp -
Alat Rangka Atap Baja Canai Dingin 0.1000
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.4.1.8 Pemasangan 1m² dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.3000 Rp 74,400
Tukang Batu oh 0.1000 Rp 93,600
Kepala Tukang oh 0.0100 Rp 100,000
Mandor oh 0.0150 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Bata merah m² 70.0000 Rp 1,650
Semen portland Kg 14.3700 Rp 97,080
Pasir Pasang m³ 0.0400 Rp 380,400
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.4.1.8(1) Pemasangan 1m' tanggulan bata t=10 cm berikut plester dan aci untuk dudukan partisi kaca frameless
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.3000 Rp 74,400
Tukang Batu oh 0.1000 Rp 93,600
Kepala Tukang oh 0.0100 Rp 100,000
Mandor oh 0.0150 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Bata merah m² 7.0000 Rp 1,650
Semen portland Kg 2.0000 Rp 97,080
Pasir Pasang m³ 0.0080 Rp 380,400
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.4.1.26 Pemasangan 1 m² dinding bata ringan tebal 10 cm dengan mortar siap pakai
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.671 Rp 74,400
Tukang Batu oh 1.300 Rp 93,600
Kepala Tukang oh 0.130 Rp 100,000
Mandor oh 0.003 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Bata ringan tebal 10 cm m³ 8.4 #NAME?
Mortar siap pakai Kg 0.063 Rp 239,160
Jumlah Harga Bahan
C Peralatan
Peralatan Pasang Dinding Bata Ringan Ls 0.1000 #NAME?
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.4.3.34.(1) Pemasangan 1m² Meja beton Granit tile black gold uk. 60cm x 60cm
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.7000 Rp 74,400
Tukang Batu oh 0.3500 Rp 93,600
Kepala tukang oh 0.0350 Rp 100,000
Mandor oh 0.0350 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Granit Tile Black Gold uk. 60x60 doos 1.0500 Rp 231,840
Semen portland Kg 8.1900 Rp 97,080
Pasir Pasang m³ 0.0450 Rp 380,400
Semen Warna Kg 0.5000 Rp 4,560
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.2. Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II atau III
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 6.0000 Err:504
Tukang kayu oh 18.0000 Err:504
Kepala tukang oh 1.8000 Err:504
Mandor oh 0.3000 Err:504
Jumlah Tenaga Kerja
B Bahan
Balok kayu m³ 1.2000
Paku Biasa Kg 1.2500
Lem Kayu/Karet Kg 1.0000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.4. Pembuatan dan pemasangan 1 m² pintu klamp sederhana, kayu kelas III
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.3500 Err:504
Tukang kayu oh 1.0500 Err:504
Kepala tukang oh 0.1050 Err:504
Mandor oh 0.0180 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0400
Paku Biasa Kg 0.0500
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.5. Pembuatan dan pemasangan 1 m² daun pintu panel, kayu kelas I atau II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 1.0000 Err:504
Tukang kayu oh 3.0000 Err:504
Kepala tukang oh 0.3000 Err:504
Mandor oh 0.0500 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0400
Lem Kayu/Karet Kg 0.5000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.6. Pembuatan dan pemasangan 1 m² pintu dan jendela kaca, kayu kelas I atau II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.8000 Err:504
Tukang kayu oh 2.4000 Err:504
Kepala tukang oh 0.2400 Err:504
Mandor oh 0.0400 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0240
Lem Kayu/Karet Kg 0.3000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.7. Pembuatan dan pemasangan 1 m² pintu dan jendela jalusi kayu kelas I atau II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 1.0000 Err:504
Tukang kayu oh 3.0000 Err:504
Kepala tukang oh 0.3000 Err:504
Mandor oh 0.0500 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0640
Lem Kayu/Karet Kg 0.5000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.8. Pembuatan 1 m² daun pintu plywood rangkap, rangka kayu kelas II tertutup
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.7000 Err:504
Tukang kayu oh 2.1000 Err:504
Kepala tukang oh 0.2100 Err:504
Mandor oh 0.0350 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0250
Paku Biasa kg 0.0300
Lem Kayu/Karet kg 0.5000
Plywood 4 mm Lembar 1.0000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.9. Pembuatan 1 m² pintu plywood rangkap, rangka expose kayu kelas I atau II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.8000 Err:504
Tukang kayu oh 2.4000 Err:504
Kepala tukang oh 0.2400 Err:504
Mandor oh 0.0400 Err:504
Jumlah Tenaga Kerja
B Bahan
kayu Papan m³ 0.0256
Paku Biasa kg 0.0300
Lem Kayu/Karet kg 0.5000
Plywood 4 mm Lembar 1.0000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.12. Pemasangan 1 m² teakwood rangkap lapis formika, rangka expose kayu kelas II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.85 Err:504
Tukang kayu oh 2.550 Err:504
Kepala tukang oh 0.255 Err:504
Mandor oh 0.043 Err:504
Jumlah Tenaga Kerja
B Bahan
Kayu Papan m³ 0.025
Paku Biasa kg 0.03
Lem Kayu/Karet kg 0.8
Teakwood 4 mm 90 x 220 cm Lembar 1.000
Formika Lembar 0.5
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.13. Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 4.000 Err:504
Tukang kayu oh 12.000 Err:504
Kepala tukang oh 1.200 Err:504
Mandor oh 0.2 Err:504
Jumlah Tenaga Kerja
B Bahan
Balok kayu m³ 1.100
Besi strip kg 15.000
Paku Biasa kg 5.600
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.19. Pemasangan 1 m² rangka langit-langit (50 x 100) cm, kayu kelas II atau III
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.15 Err:504
Tukang kayu oh 0.3 Err:504
Kepala tukang oh 0.03 Err:504
Mandor oh 0.075 Err:504
Jumlah Tenaga Kerja
B Bahan
Kayu 5/7 m³ 0.0154
Paku Biasa kg 0.2
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.20. Pemasangan 1 m² rangka langit-langit (60 x 60) cm, kayu kelas II atau III
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.2 Err:504
Tukang kayu oh 0.3 Err:504
Kepala tukang oh 0.03 Err:504
Mandor oh 0.01 Err:504
Jumlah Tenaga Kerja
B Bahan
Kayu 5/7 m³ 0.0163
Paku Biasa kg 0.25
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.21. Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.1 Err:504
Tukang kayu oh 0.2 Err:504
Kepala tukang oh 0.02 Err:504
Mandor oh 0.005 Err:504
Jumlah Tenaga Kerja
B Bahan
Kayu Papan m³ 0.0108
Paku Biasa kg 0.1
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.22. Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.1 Err:504
Tukang kayu oh 0.2 Err:504
Kepala tukang oh 0.02 Err:504
Mandor oh 0.005 Err:504
Jumlah Tenaga Kerja
B Bahan
Kayu Papan m³ 0.011
Paku Biasa kg 0.05
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.6.1.23. Pemasangan 1 m² rangka dinding pemisah (60 x 120) cm kayu kelas II atau III
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.15 Err:504
Tukang kayu oh 0.45 Err:504
Kepala tukang oh 0.045 Err:504
Mandor oh 0.008 Err:504
Jumlah Tenaga Kerja
B Bahan
Balok kayu m³ 0.028
Paku Biasa kg 0.15
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.4.7.1.11. (1) Pengecatan 1 m² plafond ( 1 lapis cat dasar, 2 lapis cat penutup)
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 0.030 Rp 74,400
Tukang cat oh 0.045 Rp 93,600
Kepala tukang oh 0.050 Rp 100,000
Mandor oh 0.003 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Cat dasar Tembok Kg 0.120 Rp 61,440
Kuas bh 0.010 Rp 18,000
Roll Cat bh 0.010 Rp 54,000
Ampelas lbr 1.000 Rp 8,760
Cat Penutup Tembok Kg 0.180 Rp 119,160
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
A.5.1.1.1. (K3) Pemasangan 1 buah closet duduk/monoblock
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 3.300 Rp 74,400
Tukang batu oh 1.100 Rp 93,600
Kepala tukang oh 0.010 Rp 100,000
Mandor oh 0.160 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Closet duduk Unit 1.000 Rp 3,600,000
Perlengkapan % 0.060 Rp 3,600,000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.5.1.1 5. (1) (K3) Pemasangan 1 buah Kitchen sink single bowl dan kran
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Pekerja oh 1.200 Rp 74,400
Tukang batu oh 1.450 Rp 93,600
Kepala tukang oh 0.150 Rp 100,000
Mandor oh 0.060 Rp 110,000
Jumlah Tenaga Kerja
B Bahan
Kitchen sink single bowl dan kran Unit 1.200 Rp 2,046,000
Semen portland Kg 6.000 Rp 97,080
Pasir pasang m³ 0.010 Rp 380,400
Perlengkapan % 12.000 Rp 30,415
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.8.4.6.1.(2) (K3) Pemasangan 1 buah titik Stop kontak tanam dinding berikut instalasi
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Upah % 1.0000 Rp 17,480,160
Jumlah Tenaga Kerja
B Bahan
Pipa listrik 5/8” btg 2.0000 Rp -
Kabel NYM 3x2,5 mm² m' 10.0000 Rp 1,741,200
Stop kontak tanam bh 1.0000 Rp 48,000
L.Bow bh 2.0000 Rp 9,000
Klem Pipa Listrik bh 6.0000 Rp 360
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.8.4.6.1.(4) 1 titik Instalasi Pipa Refrigerant AC Split lengkap isolasi dan Instalasi Pipa Drain PVC/AW dia. 1/2 "
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Upah Instalasi dan Pemasangan % 1.0000 Rp 12,691,400
Jumlah Tenaga Kerja
B Bahan
Pipa Tembaga dari indoor ke outdoor m' 7.0000 Rp 65,000
Kabel NYM 3 x 2,5 m' 7.0000 Rp 1,741,200
Pipa Air Drain AC btg 2.0000 Rp -
Stop Kontak Tanam bh 1.0000 Rp 48,000
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.8.4.6.1.(8) 1 m¹ Pemasangan Lampu Indirect LED, Berikut Instalasi Lampu dan Saklar
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Upah % 1.0000 Rp 237,240
Jumlah Tenaga Kerja
B Bahan
Lampu indirect LED m' 1.0000 Rp 7,800
Kabel NYM 2x1.5 m' 0.2000 Rp 993,600
Ataptor bh 0.2000 Rp 21,600
Saklar Clipsal bh 1.0000 Rp 26,400
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
A.8.4.6.1.(12) (K3) Pemasangan 1 Titik Kabel Kamera CCTV Belden Coaxial RG59 + Power
No Uraian Satuan Koefisien Harga Satuan (Rp.)
A Tenaga
Upah % 1.0000 Rp 143,500
Jumlah Tenaga Kerja
B Bahan
Kabel Kamera CCTV Belden Coaxial RG59 + Power m' 25.0000 Rp 3,700
Jack BNC Jack konektor CCTV yang menghubungkan CCTV kamera ke
bh 2.0000 Rp 22,000
DVR
Jack Power DC 2.1x5.5mm CCTV 12V Female Power Plug to Screw
bh 1.0000 Rp 7,000
Soket CCTV
Jumlah Harga Bahan
C Peralatan Rp -
Jumlah Harga Alat
D Jumlah (A+B+C) Rp -
E Overhead & Profit 10% 10%
F Harga Satuan Pekerjaan (D+E) Rp -
Rp 7,440
Rp 9,360
Rp 1,000
Rp 550
Rp 18,350
Rp -
Rp 984,470
Rp 511
Rp -
Rp 1,014,242
Rp -
Rp -
Rp 1,017,962
Rp 101,796
Rp 1,119,757
Rp 74,400
Rp 187,200
Rp 20,000
Rp 5,500
Rp 287,100
Rp 197,250
Rp 1,525,929
Rp 7,668
Rp 1,747,440
Rp 14,130
Rp 18,113
Rp 102,000
Rp 242,352
Rp 2,124,035
Rp -
Rp -
Rp 3,276,558
Rp 327,656
Rp 3,604,213
Rp 7,440
Rp 5,500
Rp 12,940
Rp -
Rp -
Rp 12,940
Rp 1,294
Rp 14,234
Rp 992,050
Rp 73,260
Rp 1,065,310
Rp -
Rp -
Rp -
Rp -
Rp 1,065,310
Rp 106,531
Rp 1,171,840
Rp 11,160
Rp 825
Rp 11,985
Rp -
Rp -
Rp -
Rp -
Rp 11,985
Rp 1,199
Rp 13,183
Rp 11,160
Rp 825
Rp 11,985
Rp -
Rp -
Rp -
Rp -
Rp 11,985
Rp 1,199
Rp 13,183
Rp 14,880
Rp 1,100
Rp 15,980
Rp -
Rp -
Rp -
Rp -
Rp 15,980
Rp 1,598
Rp 17,578
Rp 18,600
Rp 1,375
Rp 19,975
Rp -
Rp -
Rp -
Rp -
Rp 19,975
Rp 1,998
Rp 21,972
Rp 52,080
Rp 3,850
Rp 55,930
Rp -
Rp -
Rp -
Rp -
Rp 55,930
Rp 5,593
Rp 61,523
Jumlah Harga (Rp.)
Rp 22,320
Rp 1,100
Rp 23,420
Rp 193,680
Rp 193,680
Rp -
Rp -
Rp 217,100
Rp 21,710
Rp 238,810
Rp 122,760
Rp 25,740
Rp 2,800
Rp 9,130
Rp 160,430
Rp 37,278,720
Rp 232,809
Rp 209,099
Rp -
Rp 37,720,627
Rp -
Rp -
Rp 37,881,057
Rp 3,788,106
Rp 41,669,163
Rp 74,400
Rp 93,600
Rp 10,000
Rp 5,500
Rp 183,500
Rp 376,800
Rp 376,800
Rp -
Rp -
Rp 560,300
Rp 56,030
Rp 616,330
Rp 1,591,980
Rp 1,384,894
Rp 1,116
Rp 14,040
Rp 1,500
Rp 88
Rp 16,744
Rp 116,317
Rp 116,317
Rp -
Rp -
Rp 133,061
Rp 13,306
Rp 146,367
Rp 3,199
Rp 4,025
Rp 430
Rp 231
Rp 7,885
Rp 153,780
Rp -
Rp 3,478
Rp 157,258
Rp -
Rp -
Rp 165,143
Rp 16,514
Rp 181,656
Rp 6,324
Rp 7,956
Rp 900
Rp 550
Rp 15,730
Rp 174,720
Rp -
Rp 174,720
Rp -
Rp -
Rp 190,450
Rp 19,045
Rp 209,495
Rp 1,116
Rp 14,040
Rp 1,500
Rp 88
Rp 16,744
Rp 127,512
Rp 2,898
Rp 130,410
Rp -
Rp -
Rp 147,154
Rp 14,715
Rp 161,869
Rp 1,860
Rp 23,400
Rp 2,500
Rp 143
Rp 27,903
Rp 3,108,204
Rp 4,057
Rp 3,112,261
Rp -
Rp -
Rp 3,140,164
Rp 314,016
Rp 3,454,180
Rp 372
Rp 46,800
Rp 5,000
Rp 330
Rp 52,502
Rp 463,200
Rp 463,200
Rp -
Rp -
Rp 515,702
Rp 51,570
Rp 567,272
Jumlah Harga (Rp.)
Rp 3,720
Rp 46,800
Rp 5,000
Rp 330
Rp 55,850
Rp 768,000
Rp 768,000
Rp -
Rp -
Rp 823,850
Rp 82,385
Rp 906,235
Rp 4,464
Rp 56,160
Rp 6,000
Rp 330
Rp 66,954
Rp 1,110,000
Rp 1,110,000
Rp -
Rp -
Rp 1,176,954
Rp 117,695
Rp 1,294,649
Rp 1,089,936
Rp 1,256,970
Rp 305,932
Rp 292,734
Rp 567,272
Rp 1,932,000
Rp 906,235
Rp 283,500
Rp 6,634,579
Rp 1,053,605
Rp 773,942
Rp 292,734
Rp 685,200
Rp 567,272
Rp 3,372,753
Rp 1,089,936
Rp 773,942
Rp 292,734
Rp 685,200
Rp 567,272
Rp 3,409,084
Rp 6,528,400
Rp 288,000
Rp 428,400
Rp 240,000
Rp 3,060,000
Rp 1,110,000
Rp 1,932,000
Rp 13,586,800
K3)
Rp 14,435,018
Rp 744,000
Rp 428,400
Rp 240,000
Rp 3,060,000
Rp 1,110,000
Rp 1,932,000
Rp 3,259,620
Rp 630,000
Rp 25,839,038
Rp 2,107,210
Rp 1,256,970
Rp 781,827
Rp 292,734
Rp 567,272
Rp 1,932,000
Rp 7,245
Rp 906,235
Rp 724,500
Rp 8,575,993
Rp 2,470,522
Rp 1,675,960
Rp 972,185
Rp 292,734
Rp 567,272
Rp 1,932,000
Rp 7,245
Rp 906,235
Rp 900,900
Rp 9,725,053
Rp 7,461,029
Rp 485,760
Rp 285,600
Rp 360,000
Rp 1,078,000
Rp 455,000
Rp 324,000
Rp 317,520
Rp 700,000
Rp 3,234,000
Rp 261,800
Rp 1,001,000
Rp 8,280
Rp 15,971,989
Rp 23,695,675
Rp 1,316,640
Rp 571,200
Rp 720,000
Rp 4,312,000
Rp 910,000
Rp 1,029,000
Rp 999,600
Rp 1,750,000
Rp 6,468,000
Rp 523,600
Rp 2,002,000
Rp 11,592
Rp 44,309,307
Rp 10,500,707
Rp 528,000
Rp 285,600
Rp 360,000
Rp 1,078,000
Rp 455,000
Rp 456,000
Rp 441,000
Rp 700,000
Rp 3,234,000
Rp 261,800
Rp 1,001,000
Rp 9,660
Rp 19,310,767
Rp 5,703,998
Rp 6,578,143
Rp 1,321,175
Rp 1,224,300
Rp 115,920
Rp 14,943,536
Rp 5,703,998
Rp 6,578,143
Rp 1,321,175
Rp 1,428,350
Rp 115,920
Rp 15,147,586
Rp 3,633,120
Rp 4,189,900
Rp 1,061,213
Rp 983,400
Rp 57,960
Rp 9,925,593
Rp 15,543,810
Rp 844,800
Rp 675,000
Rp 17,063,610
Rp 30,341,517
Rp 1,286,400
Rp 1,317,600
Rp 32,945,517
Rp 1,050,000
Rp 182,400
Rp 300,000
Rp 1,532,400
Rp 1,750,000
Rp 192,000
Rp 1,942,000
Rp 1,750,000
Rp 192,000
Rp 1,942,000
Rp 26,040
Rp 32,760
Rp 3,500
Rp 1,980
Rp 64,280
Rp 450,000
Rp 450,000
Rp -
Rp -
Rp 514,280
Rp 51,428
Rp 565,708
Rp 29,760
Rp 28,080
Rp 6,000
Rp 660
Rp 64,500
Rp 70,500
#NAME?
#NAME?
Rp 29,322
Rp 6,600
Rp 6,012
#NAME?
Rp -
Rp -
#NAME?
#NAME?
#NAME?
Rp 14,880
Rp 32,760
Rp 10,000
Rp 1,100
Rp 58,740
Rp 35,250
#NAME?
#NAME?
Rp 28,236
Rp 6,012
Rp 19,800
#NAME?
Rp -
Rp -
#NAME?
#NAME?
#NAME?
Rp 14,880
Rp 32,760
Rp 10,000
Rp 1,100
Rp 58,740
Rp 77,750
Rp 1,680,000
#NAME?
#NAME?
Rp 15,070
Rp 17,160
#NAME?
Rp -
Rp -
#NAME?
#NAME?
#NAME?
Rp 14,880
Rp 32,760
Rp 10,000
Rp 1,100
Rp 58,740
Rp 2,375,000
#NAME?
#NAME?
Rp 17,160
#NAME?
Rp -
Rp -
#NAME?
#NAME?
#NAME?
Rp 4,464
Rp 3,744
Rp 5,000
Rp 330
Rp 13,538
Rp 8,928
Rp 7,488
Rp 10,000
Rp 660
Rp 27,076
Rp 4,464
Rp 3,744
Rp 5,000
Rp 330
Rp 13,538
Rp 14,880
Rp 9,360
Rp 3,333
Rp 1,100
Rp 28,673
Rp 8,928
Rp 7,488
Rp 10,000
Rp 660
Rp 27,076
Rp 7,440
Rp 7,020
Rp 1,500
Rp 550
Rp 16,510
Rp 10,575
#NAME?
#NAME?
Rp 5,430
#NAME?
Rp 2,004
#NAME?
Rp -
Rp -
#NAME?
#NAME?
#NAME?
Rp 56,574
Rp 71,173
Rp 7,600
Rp 4,180
Rp 139,527
Rp 1,225,000
Rp 1,225,000
Rp -
Rp 122,500
Rp 122,500
Rp 1,487,027
Rp 148,703
Rp 1,635,729
Rp 44,640
Rp 18,720
Rp 2,000
Rp 3,300
Rp 68,660
Rp 231,000
Rp 3,198,786
Rp 34,616
Rp 3,464,402
Rp -
Rp -
Rp 3,533,062
Rp 353,306
Rp 3,886,368
Rp 22,320
Rp 9,360
Rp 1,000
Rp 1,650
Rp 34,330
Rp 115,500
Rp 1,395,040
Rp 15,216
Rp 1,525,756
Rp -
Rp -
Rp 1,560,086
Rp 156,009
Rp 1,716,094
Rp 22,320
Rp 9,360
Rp 1,000
Rp 1,650
Rp 34,330
Rp 11,550
Rp 194,160
Rp 3,043
Rp 208,753
Rp -
Rp -
Rp 243,083
Rp 24,308
Rp 267,391
Rp 49,922
Rp 121,680
Rp 13,000
Rp 330
Rp 184,932
#NAME?
Rp 15,067
#NAME?
#NAME?
Rp -
#NAME?
#NAME?
#NAME?
Rp 22,320
Rp 14,040
Rp 1,500
Rp 1,650
Rp 39,510
Rp 754,894
Rp 8,749
Rp 763,643
Rp -
Rp -
Rp 803,153
Rp 80,315
Rp 883,468
Rp 14,880
Rp 9,360
Rp 1,000
Rp 1,100
Rp 26,340
Rp 315,510
Rp 315,510
Rp -
Rp -
Rp 341,850
Rp 34,185
Rp 376,035
Rp 52,080
Rp 32,760
Rp 3,500
Rp 3,850
Rp 92,190
Rp 318,150
Rp 795,085
Rp 17,118
Rp 2,280
Rp 1,132,633
Rp -
Rp -
Rp 1,224,823
Rp 122,482
Rp 1,347,305
Rp 52,080
Rp 32,760
Rp 3,500
Rp 3,850
Rp 92,190
Rp 243,432
Rp 795,085
Rp 17,118
Rp 2,280
Rp 1,057,915
Rp -
Rp -
Rp 1,150,105
Rp 115,011
Rp 1,265,115
Rp 6,696
Rp 8,424
Rp 3,500
Rp 550
Rp 19,170
Rp 157,200
Rp 110,671
Rp 1,141
Rp 114
Rp 269,126
Rp -
Rp -
Rp 288,296
Rp 28,830
Rp 317,126
Rp 8,928
Rp 11,232
Rp 1,200
Rp 660
Rp 22,020
Rp 126,000
Rp 30
Rp 126,030
Rp -
Rp -
Rp 148,050
Rp 14,805
Rp 162,855
Rp 66,960
Rp 42,120
Rp 4,500
Rp 4,950
Rp 118,530
Rp 515,333
Rp 902,844
Rp 6,847
Rp 8,846
Rp 1,433,871
Rp -
Rp -
Rp 1,552,401
Rp 155,240
Rp 1,707,641
Rp 22,097
Rp 3,089
Rp 1,000
Rp 1,634
Rp 27,819
Rp 679,560
Rp 26,628
Rp 706,188
Rp -
Rp -
Rp 734,007
Rp 110,101
Rp 844,108
Rp 22,097
Rp 3,089
Rp 1,000
Rp 1,634
Rp 27,819
Rp 679,560
Rp 26,628
Rp 4,380
Rp 706,188
Rp -
Rp -
Rp 736,197
Rp 110,430
Rp 846,626
Rp 223,200
Rp 30,888
Rp 30,888
Rp 30,888
Rp 300
Rp 11,000
Rp 327,164
Rp 223,920
Rp 7,668
Rp 576,720
Rp 10,920
Rp 5,339,400
Rp 34,236
Rp 54,338
Rp 6,247,202
Rp -
Rp -
Rp 6,574,366
Rp 986,155
Rp 7,560,520
Rp 96,720
Rp 60,840
Rp 6,500
Rp 7,150
Rp 171,210
Rp 2,438,000
Rp 1,207,675
Rp 9,510
Rp -
Rp 3,655,185
Rp -
Rp -
Rp 3,826,395
Rp 382,640
Rp 4,209,034
Rp 1,488
Rp 18,720
Rp 2,000
Rp 220
Rp 22,428
Rp 47,952
Rp 7,200
Rp 55,152
Rp -
Rp -
Rp 77,580
Rp 7,758
Rp 85,338
Rp 7,440
Rp 4,680
Rp 500
Rp 550
Rp 13,170
Rp 36,953
Rp 7,260
Rp 44,213
Rp -
Rp -
Rp 57,383
Rp 5,738
Rp 63,121
Rp 3,720
Rp 4,680
Rp 500
Rp 330
Rp 9,230
Rp 36,540
Rp 256
Rp 36,796
Rp -
Rp -
Rp 46,026
Rp 4,603
Rp 50,628
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Fpintu
Rp -
Rp - F
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Jumlah Harga (Rp.)
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Rp 1,265
Rp 15,912
Rp 1,700
Rp 99
Rp 18,976
Rp 263,076
Rp 4,057
Rp 267,133
Rp -
Rp -
Rp 286,109
Rp 28,611
Rp 314,719
Rp -
Rp -
Rp -
Rp -
Rp -
Rp 27,903
Rp 2,790
Rp 30,693
Rp 2,083
Rp 3,931
Rp 420
Rp 330
Rp 6,764
Rp 7,373
Rp 180
Rp 540
Rp 8,760
Rp 21,449
Rp 38,302
Rp -
Rp -
Rp 45,066
Rp 4,507
Rp 49,572
Rp 2,232
Rp 4,212
Rp 5,000
Rp 330
Rp 11,774
Rp 7,373
Rp 180
Rp 540
Rp 8,760
Rp 21,449
Rp 38,302
Rp -
Rp -
Rp 50,076
Rp 5,008
Rp 55,083
Rp 245,520
Rp 102,960
Rp 1,000
Rp 17,600
Rp 367,080
Rp 3,600,000
Rp 216,000
Rp 3,816,000
Rp -
Rp -
Rp 4,183,080
Rp 418,308
Rp 4,601,388
Rp 74,400
Rp 140,400
Rp 15,000
Rp 17,600
Rp 247,400
Rp 4,704,000
Rp 582,480
Rp 3,804
Rp 5,290,284
Rp -
Rp -
Rp 5,537,684
Rp 553,768
Rp 6,091,452
Rp 74,400
Rp 140,400
Rp 15,000
Rp 17,600
Rp 247,400
Rp 753,600
Rp 582,480
Rp 3,804
Rp 1,339,884
Rp -
Rp -
Rp 1,587,284
Rp 158,728
Rp 1,746,012
Err:504
Err:504
Err:504
Err:504
Err:504
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Rp -
Err:504
Err:504
Err:504
Rp 74,400
Rp 93,600
Rp 10,000
Rp 5,500
Rp 183,500
Rp 3,924,000
Rp 90,000
Rp 582,480
Rp 3,804
Rp 1,380,085
Rp 5,980,369
Rp -
Rp -
Rp 6,163,869
Rp 616,387
Rp 6,780,256
Rp 89,280
Rp 135,720
Rp 15,000
Rp 6,600
Rp 246,600
Rp 1,800,000
Rp 1,053,600
Rp 582,480
Rp 3,804
Rp 412,786
Rp 3,852,670
Rp -
Rp -
Rp 4,099,270
Rp 409,927
Rp 4,509,197
Rp 89,280
Rp 135,720
Rp 15,000
Rp 6,600
Rp 246,600
Rp 2,455,200
Rp 582,480
Rp 3,804
Rp 364,978
Rp 3,406,462
Rp -
Rp -
Rp 3,653,062
Rp 365,306
Rp 4,018,368
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 548,400
Rp 548,400
Rp -
Rp -
Rp 560,054
Rp 56,005
Rp 616,059
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 339,600
Rp 339,600
Rp -
Rp -
Rp 351,254
Rp 35,125
Rp 386,379
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 608,400
Rp 608,400
Rp -
Rp -
Rp 620,054
Rp 62,005
Rp 682,059
Jumlah Harga (Rp.)
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 768,000
Rp 768,000
Rp -
Rp -
Rp 779,654
Rp 77,965
Rp 857,619
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 7,560,000
Rp 7,560,000
Rp -
Rp -
Rp 7,571,654
Rp 757,165
Rp 8,328,819
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 166,800
Rp 166,800
Rp -
Rp -
Rp 178,454
Rp 17,845
Rp 196,299
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 2,916,000
Rp 2,916,000
Rp -
Rp -
Rp 2,927,654
Rp 292,765
Rp 3,220,419
Rp 744
Rp 9,360
Rp 1,000
Rp 550
Rp 11,654
Rp 343,200
Rp 343,200
Rp -
Rp -
Rp 354,854
Rp 35,485
Rp 390,339
Rp 2,678
Rp 5,616
Rp 600
Rp 220
Rp 9,114
Rp 29,664
Rp 10,382
Rp 40,046
Rp -
Rp -
Rp 49,161
Rp 4,916
Rp 54,076
Rp 2,678
Rp 5,616
Rp 600
Rp 220
Rp 9,114
Rp 41,760
Rp 14,616
Rp 56,376
Rp -
Rp -
Rp 65,490
Rp 6,549
Rp 72,039
Rp 2,678
Rp 5,616
Rp 600
Rp 220
Rp 9,114
Rp 55,728
Rp 19,505
Rp 75,233
Rp -
Rp -
Rp 84,347
Rp 8,435
Rp 92,781
Rp 4,018
Rp 8,424
Rp 900
Rp 330
Rp 13,672
Rp 86,976
Rp 30,442
Rp 117,418
Rp -
Rp -
Rp 131,089
Rp 13,109
Rp 144,198
Rp 4,018
Rp 8,424
Rp 900
Rp 330
Rp 13,672
Rp 121,824
Rp 42,638
Rp 164,462
Rp -
Rp -
Rp 178,134
Rp 17,813
Rp 195,947
Rp 6,026
Rp 12,636
Rp 1,350
Rp 440
Rp 20,452
Rp 173,952
Rp 60,883
Rp 234,835
Rp -
Rp -
Rp 255,288
Rp 25,529
Rp 280,816
Rp 6,026
Rp 12,636
Rp 1,350
Rp 440
Rp 20,452
Rp 243,504
Rp 85,226
Rp 328,730
Rp -
Rp -
Rp 349,183
Rp 34,918
Rp 384,101
Rp 6,026
Rp 12,636
Rp 1,350
Rp 440
Rp 20,452
Rp 365,184
Rp 127,814
Rp 492,998
Rp -
Rp -
Rp 513,451
Rp 51,345
Rp 564,795
Rp 41,868,372
Rp 41,868,372
Rp -
Rp 41,788,800
Rp -
Rp 36,000
Rp 3,132
Rp 8,640
Rp 5,400
Rp 26,400
Rp 66,000
Rp 81,600
Rp 42,015,972
Rp -
Rp -
Rp 83,884,344
Rp 8,388,434
Rp 92,272,778
Rp 41,868,372
Rp 41,868,372
Rp -
Rp 41,788,800
Rp -
Rp 36,000
Rp 3,132
Rp 8,640
Rp 5,400
Rp 26,400
Rp 125,000
Rp 41,993,372
Rp -
Rp -
Rp 83,861,744
Rp 8,386,174
Rp 92,247,918
Rp 17,480,160
Rp 17,480,160
Rp -
Rp 17,412,000
Rp 48,000
Rp 18,000
Rp 2,160
Rp 17,480,160
Rp -
Rp -
Rp 34,960,320
Rp 3,496,032
Rp 38,456,352
Rp 10,465,920
Rp 10,465,920
Rp -
Rp 10,447,200
Rp 18,000
Rp 720
Rp 350,000
Rp 10,815,920
Rp -
Rp -
Rp 21,281,840
Rp 2,128,184
Rp 23,410,024
Rp 12,691,400
Rp 12,691,400
Rp 455,000
Rp 12,188,400
Rp -
Rp 48,000
Rp 12,691,400
Rp -
Rp -
Rp 25,382,800
Rp 2,538,280
Rp 27,921,080
Rp 19,153,200
Rp -
Rp -
Rp 1,080
Rp 2,088
Rp 570
Rp 19,156,938
Rp -
Rp -
Rp 28,735,407
Rp 2,873,541
Rp 31,608,947
Rp 426,395
Rp 426,395
Rp 271,475
Rp -
Rp 121,200
Rp 4,200
Rp 25,200
Rp 4,320
Rp 426,395
Rp -
Rp -
Rp 852,791
Rp 85,279
Rp 938,069
Rp 197,400
Rp 197,400
Rp 138,000
Rp -
Rp 4,200
Rp 51,600
Rp 3,600
Rp 197,400
Rp -
Rp -
Rp 394,800
Rp 39,480
Rp 434,280
Rp 237,240
Rp 237,240
Rp 7,800
Rp 198,720
Rp 4,320
Rp 26,400
Rp 237,240
Rp -
Rp -
Rp 474,480
Rp 47,448
Rp 521,928
Rp 41,868,372
Rp 41,868,372
Rp -
Rp 41,788,800
Rp -
Rp 36,000
Rp 3,132
Rp 8,640
Rp 5,400
Rp 26,400
Rp 3,400,000
Rp 45,268,372
Rp -
Rp -
Rp 87,136,744
Rp 8,713,674
Rp 95,850,418
Rp 9,061,000
Rp 9,061,000
Rp 180,000
Rp 8,706,000
Rp 175,000
Rp 9,061,000
Rp -
Rp -
Rp 18,122,000
Rp 1,812,200
Rp 19,934,200
Rp 10,585,920
Rp 10,585,920
Rp -
Rp 10,447,200
Rp 18,000
Rp 720
Rp 120,000
Rp 10,585,920
Rp -
Rp -
Rp 21,171,840
Rp 2,117,184
Rp 23,289,024
Rp 143,500
Rp 143,500
Rp 92,500
Rp 44,000
Rp 7,000
Rp 143,500
Rp -
Rp -
Rp 287,000
Rp 28,700
Rp 315,700
Rp 9,461,000
Rp 9,461,000
Rp 180,000
Rp 8,706,000
Rp 575,000
Rp 594,000
Rp 9,461,000
Rp -
Rp -
Rp 19,219,000
Rp 1,921,900
Rp 21,140,900
No. Nama Satuan Harga Satuan Sumber Reverensi Harga
I Material Kayu
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Usuk Dolken kayu Ø 10 Panjang = 4m btg Rp 157,800 Hal 487
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kayu Ukuran Kaso 5x7x350 cm (Kayu Meranti) m³ Rp 8,203,920 Hal 489
Spandek 0.35 m³ Rp 102,000 http://hargabangunanmurah.com/harga-spandek/
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Plywood Uk.3 mm (122x244 cm) lbr Rp 179,520 Hal 489
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Triplek Uk.9 mm (122x244 cm) lbr Rp 223,920 Hal 489
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Triplek Uk.12 mm (122x244 cm) lbr Rp 326,400 Hal 489
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Bambu diameter 6 - 8 / 600 cm btg Rp 17,400 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Papan Meranti Uk 3 x 20 x 400 cm m³ Rp 9,300,000 Hal 478
https://www.bukalapak.com/p/rumah-
tangga/furniture-interior/dekorasi-rumah/
tpxl1u-jual-list-plint-lantai-10-cm?
blca=SESHO-SHPRT&blpt=SESHO-
SHPRT&gclid=EAIaIQobChMI4NGjldim4QIVA
iQrCh0QmQLWEAQYAyABEgKXgfD_BwE&kp
id=go_992207883_47246373577_23439516
4217_aud-550125405810%3Apla-
List Plint Lantai Kayu tinggi 10 cm m' Rp 126,000 580014101014_c&sho=47246373577_1o3_
992207883_c_9072592_g_aud-
550125405810%3Apla-580014101014
Kayu Uk Kaso balok 5x7x350 cm kelas III Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
m³ Rp 3,249,240 Hal 489
(Rasamala,Salam,Puspa,dll)
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Paku Sekrup uk 2 -5" kg Rp 600 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Paku Reng/Usuk kg Rp 29,040 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Paku Biasa Uk 1/2 - 1" kg Rp 25,560 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Paku Biasa Uk 2 - 5" kg Rp 21,840 Hal 485
III Material Bata Pasir dan Semen
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Batu Pecah Uk. 2-3 (mesin) m³ Rp 449,280 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Batu Belah Pondasi Dari Kabupaten Karawang m³ Rp 303,000 Hal 463
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Semen PC 50 Kg Zak Rp 97,080 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Semen PC kg Rp 1,941.60 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Pasir beton m³ Rp 471,000 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Pasir pasang m³ Rp 380,400 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Koral beton m³ Rp 362,250 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Pasir urug m³ Rp 161,400 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Sirtu m³ Rp 195,750 Hal 478
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Bata Merah bh Rp 1,650 Hal 479
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Bata Beton Ringan Uk. tebal 7,5 cm, 10 cm dan 12,5 cm m³ Rp 1,720,800 Hal 479
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Semen MU Uk.40 Kg Zak Rp 239,160 Hal 479
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Keramik Uk. 40cm x 40cm (KW1) Corak m2 Rp 92,760 Hal 480
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Keramik Granit uk 60 x 60 cm m2 Rp 303,000 Hal 480
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Keramik Granit uk 40 x 40 cm m2 Rp 231,840 Hal 480
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Plint Granito uk. 10cm x 40cm m' Rp 94,320 Hal 480
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi beton Diameter 6 mm "12 m btg Rp 47,939 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi beton Diameter 8 mm "12 m btg Rp 85,225 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi beton Diameter 10 mm "12 m btg Rp 133,164 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi beton Diameter 12 mm "12 m btg Rp 191,756 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi Beton U-24 kg Rp 18,000 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Besi Wiremesh M12 (2.1 x 5.4) lembar Rp 1,873,680 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kawat beton kg Rp 21,840 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Rolling Door Aluminium m² Rp 420,240 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Rolling Door Besi m² Rp 376,800 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 3" (Biasa) m¹ Rp 131,040 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 3" (Brown) m¹ Rp 139,800 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 3" (YKK) m¹ Rp 174,720 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 4" (Biasa) m¹ Rp 157,200 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 4" (Brown) m¹ Rp 174,720 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kusen Alumunium uk 4" (YKK) m¹ Rp 261,960 Hal 485
Fisher bh Rp -
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Sealant ACP tube Rp 57,960 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Sekrup ACP bh Rp 5,280 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Skrup bh Rp 600 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Skrew uk 8x16 (untuk Baja Ringan Profil U) bh Rp 600 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Alumunium Gelombang uk 0.55 m² Rp 72,480 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Alucupon merk Seven uk 122 x 244 cm tebal 0.21 (PE) lembar Rp 460,680 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Semen PC Warna Kg Rp 4,560 Hal 478
IV BAHAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Gypsum board 9 mm (1200 x 2400 mm) lbr Rp 101,520 Hal 479
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Bondek uk. Tebal 0.75 mm lbr Rp 819,000 Hal 485
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
List Profil Gypsum m¹ Rp 34,800 Hal 480
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
List Profil Kayu K-1 ( 4 x 4 ) Kayu Meranti btg Rp 60,840 Hal 489
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
List Profil Kayu K-6 ( 25 x 25 ) Kayu Meranti btg Rp 39,240 Hal 489
https://www.bukalapak.com/p/rumah-tangga/perkakas-rumah-tangga/e943ig-jual-r
https://www.lazada.co.id/products/engsel-pintu-stainles-
4ecolen-dekson-i464696009-s561058454.html?
gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6DvsQbl-
TSPeJlwRMqE7Ly-
nGDA1b0j6s13gev620ZI4ERKDNKwYQsaAoqtEALw_wcB
&s_kwcid=AL!3155!3!321877371510!!!u!!
Engsel Pintu bh Rp 116,317 &exlaz=d_1:mm_150050845_51350205_2010350205::12:16
67026050!69975702128!!!pla-368660641166!c!
368660641166!561058454!128280640&ef_id=WxDF-
AAAAL9C22jc:20190401034556:s
https://www.bukalapak.com/p/rumah-tangga/furniture-
interior/furniture-lainnya/1btabyu-jual-handle-pintu-roses-
rafes-england-sus-304-hr-18-5865?from=list-
product&product_owner=normal_seller&search
Lever Handle Staenliss Stell SUS 304 bh Rp 685,200 %5Bkeywords%5D=handle%20pintu%20roses%20rafes
%20england%20sus%20304%20hr%2018%205865
https://www.bukalapak.com/p/rumah-
tangga/home-stuff/yypjum-jual-new-pull-
handle-deluxe-ph-dl802-38x800x1200mm-
sss-handle-pintu-stainless?blca=SESHO-
SHPRT&blpt=SESHO-
SHPRT&gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ
6DlckTc4lT_6GifU4LFho0HG3VrpjOj3jQJBk_
w1LJH2Rr8nuCeCF0aAvwKEALw_wcB&kpid
=go_992207883_47246373577_234395164
217_aud-550125405810%3Apla-
Pull Handle Staenliss Stell SUS 304 tinggi maks 80 cm bh Rp 1,932,000 580014101014_c&sho=47246373577_1o6_
992207883_c_9072592_g_aud-
550125405810%3Apla-580014101014
https://www.bukalapak.com/p/rumah-tangga/home-stuff/zdwkxg-jual-patch-fitting
https://www.tokopedia.com/genhardware/dorma-universal-
patch-fitting-penjepit-pintu-kaca-pt-30-glass-door?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=Cj0KCQjw7YblBRDFARIsAKkK-
dLBRo6GpLf9npP9cob-Y7qLZ3VipSsM1y8Y-
jU3RosOM1vBKtrPawYaAjpQEALw_wcB:G:s&ds_rl=1261
Patc fitting PT30 set Rp 1,044,000 173&gclid=Cj0KCQjw7YblBRDFARIsAKkK-
dLBRo6GpLf9npP9cob-Y7qLZ3VipSsM1y8Y-
jU3RosOM1vBKtrPawYaAjpQEALw_wcB&gclsrc=aw.ds&
ef_id=WxDF-AAAAL9C22jc:20190402035420:s
https://www.bukalapak.com/p/rumah-tangga/furniture-
interior/lemari-1645/q9af0c-jual-engsel-shower-shower-
hinge-glass-to-glass-kaca-ke-kaca-dekson?blca=SEUSC-
TESTC&blpt=SEUSC-
Engsel glass to glass setara Dekson set Rp 975,600 TESTC&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV_JghaKd
BmeyPI9i04M1kdDHGCi8blbW7t1UQJxHX_NXG6u3ALM
cpIaAtOtEALw_wcB
https://www.bukalapak.com/p/rumah-tangga/perkakas-
rumah-tangga/7i8eke-jual-konektor-pipa-fleksibel-dekkson-
gh-19-03-glass-holder-tube-connector-dekson-penyangga-
kaca?blca=SESHO-SHPRT&blpt=SESHO-
SHPRT&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV-t7-
rloXFpCdPe2hOmJpAyviWj-PxdCkEkPA5V-cg5-
rQW0LH8q7AaAl4WEALw_wcB&kpid=go_992207883_47
Glass Holder pcs Rp 174,000 246373577_234395164217_aud-550125405810%3Apla-
580014101014_c&sho=47246373577_1o2_992207883_c_90
72592_g_aud-550125405810%3Apla-580014101014
https://www.bukalapak.com/p/rumah-tangga/perkakas-
rumah-tangga/18guyb1-jual-terbaru-kunci-pintu-kaca-bawah-
patch-fitting-ocius-opt10a-us-10-us10-jd-498?blca=SESHO-
SHPRT&blpt=SESHO-
SHPRT&gclid=Cj0KCQjwkIzlBRDzARIsABgXqV9WzVw
HjwqoZY8gYotwRUGrQnylAjXFaVMrzEf8keatxNr0Fit86O
gaAtWhEALw_wcB&kpid=go_992207883_47246373577_2
Kunci glass to glass Ociuss pcs Rp 396,000 34395164217_aud-550125405810%3Apla-
580014101014_c&sho=47246373577_1o2_992207883_c_90
72592_g_aud-550125405810%3Apla-580014101014
https://mitarcahyaabadai.wordpress.com/2017/04/21/harga-pipa-sus-201-ss-304-ss
Pipa stainless stell 1mmx1" SUS 304 m' Rp 207,524
https://www.tokopedia.com/genhardware/list-u-stainless-profile-u-shape-stainless-
U chanel m' Rp 150,000
https://www.tokopedia.com/putrasonna/kaca-cermin-grey-
dekorasi-wajik-bevel?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=EAIaIQobChMIneLJ5Ly44QIVyCMrCh3o4AnBEAQYA
Kaca cermin grey dekorasi wajik bevel m² Rp 1,680,000 SABEgLFqvD_BwE:G:s&ds_rl=1261173&gclid=EAIaIQob
ChMIneLJ5Ly44QIVyCMrCh3o4AnBEAQYASABEgLFqv
D_BwE&gclsrc=aw.ds&ef_id=WxDF-
AAAAL9C22jc:20190405075452:s
cutting stiker cm Rp 78
Rel Handerson set Rp 1,110,000
Kunci slot Raves bh Rp 54,000
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Rel pintu Dorong Set Rp 210,240 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Polos tebal 3mm m² Rp 87,000 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Polos tebal 5 mm m² Rp 115,920 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Polos tebal 8 mm m² Rp 239,160 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Patri m² Rp 1,303,920 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Tempered Clear 12 mm m² Rp 652,080 Hal 486
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Kaca Tempered Clear 15 mm m² Rp 2,825,640 Hal 486
VII BAHAN PEKERJAAN PENGECATAN Rp -
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Plamur Tembok Sekualitas Maxilite kg Rp 24,960 Hal 484
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Plamir Kayu Sekualitas kg Rp 29,760 Hal 483
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Cat Dasar Exterior Sekualitas Propan kg Rp 61,440 Hal 483
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Cat Warna Exterior Sekualitas Propan kg Rp 119,160 Hal 483
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Cat Kayu Sekualitas Bee Brand kg Rp 82,320 Hal 483
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Cat Kayu Sekualitas Ftalite kg Rp 86,640 Hal 483
Jurnal Harga Satuan Bahan Bangunan Edisi 38 Tahun 2019
Wallpaper m² Rp 39,960 Hal 480
https://www.tokopedia.com/wariorjakarta/lem-wallpaper-
original-grosir-paling-kuat?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=Cj0KCQjwyoHlBRCNARIsAFjKJ6DPJR4XbJu6qGjjqlZ
whxkfy_3-
V6IyzbHfFBd3DaxYc7Zj2jRbEgMaAoQ8EALw_wcB:G:s&
ds_rl=1261173&gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6D
Lem Walpaper bks Rp 36,000 PJR4XbJu6qGjjqlZwhxkfy_3-
V6IyzbHfFBd3DaxYc7Zj2jRbEgMaAoQ8EALw_wcB&gcls
rc=aw.ds&ef_id=WxDF-
AAAAL9C22jc:20190401025226:s&m_id=10907253
https://www.bukalapak.com/p/industrial/tools/11rjrta-jual-
kuas-eterna-3-inch?blca=SESHO-SHIND&blpt=SESHO-
SHIND&gclid=EAIaIQobChMIs5ugmLSc4QIV1xwrCh0k9
QrdEAQYBCABEgJRqfD_BwE&kpid=go_1626143967_738
47193068_325980949885_aud-550125407010%3Apla-
386371439963_c&sho=73847193068_1o4_1626143967_c_9
Kuas 3" bh Rp 18,000 072592_g_aud-550125407010%3Apla-386371439963
https://www.bukalapak.com/p/industrial/tools/fp7w8n-jual-bak-cat-rollan-roll-besa
https://www.tokopedia.com/300486/mika-urinal-mika-protector-u57m
mika urinal /mika protector /u57m bh Rp 90,000
https://www.bukalapak.com/p/rumah-tangga/perkakas-
rumah-tangga/19e8svu-jual-sale-paket-komplit-kitchen-sink-
onan-60x45-kran-angsa-dan-handsoap?blca=SEUSC-
TESTC&blpt=SEUSC-
Kitchen Sink Onan 60X45 Kran Angsa bh Rp 2,046,000 TESTC&gclid=Cj0KCQjw7YblBRDFARIsAKkK-
dK9nxf5bCGJXT501spjb8Fp4xklmb1EiT_gpZwTHrMMkq
MVQBmfJ2IaAl90EALw_wcB
https://www.bukalapak.com/p/elektronik/elektronik-lainnya/9fus4v-jual-elbow-e20
https://www.bukalapak.com/p/elektronik/elektronik-lainnya/2cg3qr-jual-lasdop-pre
Lasdop Press / Penyambung Kabel CE5 CE-5 6Mm (100 Pcs) bh Rp 1,044
https://shopee.co.id/KLEM-PIPA-LISTRIK--KLEM-PIPA-CONDUIT-20MM-i.15
https://www.bukalapak.com/p/elektronik/elektronik-lainnya/op68yn-jual-inbow-ib
https://www.bukalapak.com/p/elektronik/elektronik-lainnya/2oc8z7-jual-saklar-ser
https://shopee.co.id/PHILIPS-DOWNLIGHT-66664-Recessed-Nickel-Rumah-Lam
PHILIPS DOWNLIGHT 66664 Recessed Nickel | Rumah Lam bh Rp 81,600
https://shopee.co.id/Lampu-LED-Philips-12-watt-Bohlam-12w-Philip-12-w-Bulb-1
Lampu LED Philips 12 Watt Bohlam bh Rp 66,000
https://www.bukalapak.com/p/rumah-tangga/elektronik-1111/stop-kontak/pnd897-
https://www.tokopedia.com/kenzo-lambert/outlet-data-cat-5e-panasonic-telepon-pa
https://www.tokopedia.com/best168/sock-sock-shock-pipa-
conduit-20mm-clipsal?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=Cj0KCQjwyoHlBRCNARIsAFjKJ6A87yWNTnRfXCtA1
82bmsfexoKTXBz7yKKvnGK0c-
bh I8CmX_XbhihM4aAnGKEALw_wcB:G:s&ds_rl=1261173&
sock Rp 840 gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6A87yWNTnRfXCt
A182bmsfexoKTXBz7yKKvnGK0c-
I8CmX_XbhihM4aAnGKEALw_wcB&gclsrc=aw.ds&ef_id
=WxDF-AAAAL9C22jc:20190401024914:s
https://www.tokopedia.com/okthastore/konektor-rj45-cat-6-
belden-connector-rj-45-cat6-1-pack-original?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=Cj0KCQjwyoHlBRCNARIsAFjKJ6DoEfTRm0eA62gcBe
hzrDTyOyKJJC32VdPtKp34RWCdRdTO0NDGk4YaArtNE
bh ALw_wcB:G:s&ds_rl=1261173&gclid=Cj0KCQjwyoHlBRC
Connector AMP Rj45 / RJ-45 Cat 6 Rp 8,400 NARIsAFjKJ6DoEfTRm0eA62gcBehzrDTyOyKJJC32VdPt
Kp34RWCdRdTO0NDGk4YaArtNEALw_wcB&gclsrc=aw.
ds&ef_id=WxDF-AAAAL9C22jc:20190401024534:s
https://www.tokopedia.com/networkshop001/kabel-pvctelepontelpontelephone-2-p
Kabel PVC 2 Pair supreme m¹ Rp 4,600
https://www.tokopedia.com/kenzo-lambert/outlet-telepon-
panasonic-komplit-wej2164-wej78019w-tlp-panasonic?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=Cj0KCQjwyoHlBRCNARIsAFjKJ6Aj_0FgI2a8RstTa5bT
hBxyHiPMRphnHxJyFNA-
bh JZO9nP58C7WIxMkaAjvBEALw_wcB:G:s&ds_rl=1261173
Outlet telepon (RG11) Rp 51,600 &gclid=Cj0KCQjwyoHlBRCNARIsAFjKJ6Aj_0FgI2a8RstT
a5bThBxyHiPMRphnHxJyFNA-
JZO9nP58C7WIxMkaAjvBEALw_wcB&gclsrc=aw.ds&ef_i
d=WxDF-AAAAL9C22jc:20190401022850:s
https://www.tokopedia.com/wewe-electric/lampu-led-strip-
selang-smd-5050-100m-100-meter-lampu-plafon-ceiling-1?
c={campaignId}&m={merchant_id}&p={product_id}&ev_ef
id=EAIaIQobChMI_vO-
vJqn4QIVApGPCh2TDgdxEAQYBCABEgKfU_D_BwE:G:
s&ds_rl=1261173&gclid=EAIaIQobChMI_vO-
Lampu led strip selang smd 5050 100m / lampu plafon ceiling m' Rp 7,800 vJqn4QIVApGPCh2TDgdxEAQYBCABEgKfU_D_BwE&g
clsrc=aw.ds&ef_id=WxDF-
AAAAL9C22jc:20190329110606:s
Rp 131,500 20%
Rp 6,836,600
Rp 85,000
Rp 149,600
Rp 186,600
Rp 272,000
Rp 14,500
Rp 7,750,000
Rp 105,000
Rp 2,707,700
Rp 500
Rp 24,200
Rp 21,300
Rp 18,200
Rp 374,400
Rp 202,000 50%
Rp 80,900
Rp 1,618
Rp 314,000
Rp 253,600
Rp 241,500
Rp 107,600
Rp 130,500
Rp 1,100
Rp 1,147,200
Rp 199,300
Rp 77,300
Rp 252,500
Rp 193,200 0.36
Rp 78,600
Rp 15,000
Rp 1,561,400
Rp 18,200
Rp 350,200
Rp 314,000
Rp 109,200
Rp 116,500
Rp 145,600
Rp 131,000
Rp 145,600
Rp 218,300
Rp 48,300
Rp 4,400
Rp 500
Rp 500
Rp 60,400
Rp 383,900
Rp 3,800
Rp 84,600
Rp 682,500
Rp 29,000
Rp 50,700
Rp 32,700
Rp 55,000
Rp 23,000
Rp 27,900
Rp 29,000
Rp 33,900
Rp 90,500
Rp 16,700
Rp 386,000
Rp 96,931
Rp 571,000
Rp 1,610,000
Rp 640,000
Rp 40,000
Rp 119,000
Rp 50,000
Rp 65
Rp 2,550,000
Rp 925,000
Rp 870,000
Rp 813,000
Rp 145,000
Rp 330,000
Rp 172,937
Rp 125,000
Rp 1,400,000
Rp 65
Rp 925,000
Rp 45,000
Rp 175,200
Rp 72,500
Rp 96,600
Rp 199,300
Rp 1,086,600
Rp 543,400
Rp 2,354,700
Rp 20,800
Rp 24,800
Rp 51,200
Rp 99,300
Rp 68,600
Rp 72,200
Rp 33,300
Rp 30,000
Rp 15,000
Rp 45,000
Rp 7,300
Rp 3,000,000
Rp 3,270,000
Rp 283,000
Rp 2,430,000
Rp 1,250,000
Rp 878,000
Rp 311,000
Rp 507,000
Rp 640,000
Rp 139,000
Rp 457,000
Rp 6,300,000
Rp 286,000
Rp 75,000
Rp 1,705,000
Rp 20,600
Rp 29,000
Rp 38,700
Rp 60,400
Rp 84,600
Rp 120,800
Rp 169,100
Rp 253,600
Rp 7,486,500
Rp 1,451,000
Rp 19,000
Rp 7,500
Rp 870
Rp 300
Rp 4,500
Rp 22,000
Rp 68,000
Rp 55,000
Rp 40,000
Rp 1,900
Rp 7,541
Rp 101,000
Rp 700
Rp 7,000
Rp 3,833
Rp 43,000
Rp 6,500
Rp 828,000
Rp 18,000
Rp 3,920,000
Rp 628,000
DAFTAR HARGA UPAH
KOTA INDRAMAYU
JURNAL HARGA SATUAN BAHAN BANGUNAN KONSTRUKSI DAN INTERIOR
EDISI 38 TAHUN 2019
σtn (Daya dukung tanah) σtn ≤ 2kg/cm² untuk bangunan 2 lantai σtn ≤ 3kg/cm² untuk banguna
Struktur tanah bukan pasir mudah gugur
Muka air tanah dibawah alas pondasi
Bentuk Footplate
L = Lebar footplate = (4 s.d 6) x b P = Panjang footplate = (4 s.d 6) x hJika σtn ≥ 2,5 kg/cm² dengan pembulatan hasil
Keterangan b= Lebar kolom h= Tinggi kolom L= Lebar footplate P= Panjang footplate σtn= Daya du
Sumber : https://www.arsitur.com/2018/02/tips-menghtiung-dimensi-kolom-dan.html
Contoh Kasus Perhitungan Dimensi Balok dan Kolom :
- Bentangan antar kolom berjarak 6 meter
- Tentukan dimensi kolom
- Tentukan dimensi balok induk dan balok anak
- Tentukan tebal pelat lantai
Setelah mengetahui bentangan, kita tidak langsung menentukan besaran kolom. Hal yang pertama yang d
Setelah mendapatkan dimensi balok, barulah bisa dihitung besaran penampang kolom untuk menopang b
a. Lebar penampang kolom = lebar balok + (2 x 5 cm) --> 25 cm + (2 x 5 cm) = 25 + 10 cm = 35 cm
Jadi ukuran kolomnya adalah 35x35 cm. Jika menggunakan kolom pipih (setebal tembok 15 cm) maka perh
b. Dimensi jika menggunakan kolom pipih
35 x 35 cm = 15 x panjang pipih --> panjang pipih = 35 x 35 / 15 = 81,67 cm (dibulatkan menjadi 82 cm)
Jadi ukuran kolomnya (jika kolom pipih) menjadi 15 x 82 cm
Sumber = https://arsinote.blogspot.com/2017/05/balok-kantilever.html
BALOK KANTILEVER
Rumus cepat menentukan panjang balok kantilever atau lebar ruang yang akan digunakan Untuk perhitungan dibawah ini unt
jangan dijadikan sebagai patokan
Panjang balok kantilever = 1/3 L (Panjang bentang + panjang bidang kantilever)
Keterangan : Panjang bentang = jarak diantara dua kolom L = Panjang bentang + panjang bidang kantilever . Jadi, berdasarkan
rumus cepat, bila jarak antar kolom/jarak bentang adalah 2 meter maka panjang balok kantilevernya adalah 1 meter. Perhitun
Panjang kantilever adalah 1/3 x (2m+1m)= 1 meter.
Sesuai dengan karakteristik strukturnya, maka balok kantilever tidak boleh memikul beban terlalu berat. Dengan demikian, pe
tidak boleh terlalu berat. Akan lebih baik lagi bila tidak ada beban berat yang berdiri pada ujung bebasnya.
Jika terpaksa akan diberikan dinding bata di atas ujung bebasnya, maka
balok kantilever diperbesar atau balok kantilever diperpendek menjadi 1/5 x L (Panjang bentang ditambah panjang bidang kan
Panjang balok kantilever = 1/5 L (Panjang bentang + panjang bidang kantilever)
Keterangan :
Panjang bentang = jarak diantara dua kolom L = Panjang bentang + panjang bidang kantilever Jadi jika L sepanjang 3 meter (2 m
kantilever yang diperbolehkan hanya 1/5 x 3 meter = 0,6 meter atau 60 cm.
Balok kantilever berguna jika anda ingin memperluas ruang tanpa menambah kolom. Perencanaan ukuran dan demensi balok
juga menciptakan kenyamanan dan lebih hemat. Tanpa perencanaan yang baik, maka balok kantilever memerlukan perbaikan
artinya menambah biaya. Selain itu lendutan yang terlalu besar akan membuat penghuni tidak merasa nyaman.
h, tapi yang ini jangan jadi patokan ya ... hanya untuk mengansumsi
= 4 x 0.325
= 1.3 m
Hal yang pertama yang dihitung adalah balok karena balok lah yang menanggung beban bentangan.
agar tidak melendut) dan semakin tinggi balok semakin lebar juga dimensi balok tersebut.
= 0.45 ~ 0.50 m
= 0.23 ~ 0.30 m
= 0.36 ~ 0.36 m
= 0.18 ~ 0.18 m
0.1 = 0.33 m
5.4 = 0.14 m
kekakuan lentur pondasi.
10 = 0.85 m 0.425
ampai dengan 0.472222
12 = 0.71 m
5-Jan = 369495.00 m
SUMBER =
KETERANGAN GAMBAR
Sumber = https://www.agenbajaringan.com/bondek-floordeck
Bondek
Bondek
Fungsi Bondek / Floordeck
Bondek digunakan sebagai pengganti triplek pada pengecoran dag beton. Selain lebih simple keunggulan bondek d
Ukuran Bondek
Umumnya bondek yang digunakan adalah ukuran tebal 0.75 dan lebar 1m, namun sebenarnya bondek juga mempu
Bahan Bondek
Ada 2 macam bahan / pelapis yang diginakan untuk bondek ini, yaitu Galvanis dan Galvalume / Zincalume, jika and
Lebar dan model Bondek
Bondek mempunyai lebar yang berfariasi dari lebar 60cm, 70cm, 80cm, 1m. Untuk memudahkan menghitung kebut
Sumber = https://satriamadangkara.com/ukuran-standar-wiremesh-untuk-bondek-dak-beton/
Rumus penghitungan kebutuhan bondek:
Kebutuhan bondek = Panjang area X Lebar area: 8
Kebutuhan wiremesh = Area panjang X Lebar area: 10
Sumber = https://www.google.com/search?rlz=1C1CHBD_idID848ID848&ei=XmayXfPuBsnyrAGI85ygCw&q=ukuran+dimesni+
Sumber = https://www.nusantarabaja.com/2017/02/ukuran-bondek.html
Berikut ini kami akan membahas tentang Ukuran Bondek pada umunya yang di Jual Dipasaran. Kami ju
Bondek merupakan Bahan bangunan yang di pakai sebagai pengganti triplek pada konstruksi dak, Jemba
Bondek memiliki beberapa Varian Nama ( Istilah ) dan Ukuran Diantara nya :
Pada gambar di bawah ini kami akan berikan gambar Dimensi Bondek. Selain itu juga ada Ukuran Panjang dan Lebar Bondek. H
Untuk order berbagai jenis bondek yang ada di pasaran pada umum nya bisa hubungi kami
keunggulan bondek dibandingkan dengan triplek adalah lebih efisiean karena tidak ada matreal yang terbuang. Selain itu jika a
a bondek juga mempunyai bermacam ketebalan dan ukuran. Ketebalan bondek sama dengan katebalan baja ringan, yakni 0.6
e / Zincalume, jika anda sering membaca galvalume / zincalume lebih bagus dari galvanis, untuk bondek justru kebalikannya. K
kan menghitung kebutuhan matreal umumnya yang dipakai lebar 1m. Namun tidak jarang juga yang meminta model lebar 880c
Cw&q=ukuran+dimesni+bondek&oq=ukuran+dimesni+bondek&gs_l=psy-ab.3..0i13.6477.7843..8044...0.2..0.120.594.7j1....2..0....1..gws-w
l Dipasaran. Kami juga disini akan berikan juga gambar Dimensi Bondek yang akan kami bahas.
onstruksi dak, Jembatan dan liannya. Selain mempunyai komposisi bahan yang kuat, Bondek juga lebih efektif dari s
baja ringan, yakni 0.60mm, 0.65mm, 0.70mm, 0.75mm samapi 1.0mm. Untuk membedakan ketebalannya tentu lebih sulit diba
justru kebalikannya. Karena bondek lebih untuk menahan semen jadi matreal Galvanis lebih disarankan.
minta model lebar 880cm yang sering disebut model Ekor Burung. Jika ada ada kebutuhan model bondek silahkan konsultasika
594.7j1....2..0....1..gws-wiz.......0i71j0i7i30.9mMBwu401X0&ved=0ahUKEwjzlYbUtrblAhVJOSsKHYg5B7QQ4dUDCAo&uact=5
ga lebih efektif dari segi waktu dalam pengerjaan nya dibandingkan triplek.
g / penyangga dapat di minimalkan atau bahkan dihilangkan sama sekali. Dari segi penggunaan besi (wiremesh) juga akan leb
ya tentu lebih sulit dibanding dengan membedakan baja ringan / truss yang dapat ditimbang, cara yang paling mudah tentu and
silahkan konsultasikan ke kami, kerena profil bondek akan berbeda tiap pabrikan.
emesh) juga akan lebih hemat karena hanya manggunakan 1 lapis saja.
aling mudah tentu anda datang ke toko untuk melihat dan memengang langsung perbedaan yang tebal dan tipis agar tidak ter
dan tipis agar tidak tertipu.