Program :
Kegiatan :
Kode Rekening :
Lokasi Kegiatan :
Wilayah :
Volume : m'
Waktu Pelaksanaan : Pelaksanaan 330 ( Tiga Ratus Tiga Puluh ) Hari Kalender
1747.IV-A-01/-077.921
18 Agustus 2014
Organisasi / SKPD : 1.03.010 Sudin PU Jalan Kota
Administrasi Jakarta Timur
Urusan Pemerintahan : 1.03 PEKERJAAN UMUM
JADWAL PELAKSANAAN PEKERJAAN
Pelaksanaan 81 ( Delapan Puluh Satu ) Hari Kalender
Nama Paket : Penggantian Jembatan Cacing B
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 m'
Err:509 Err:509
81 ( Delapan Puluh Satu ) Hari Kalender
MATA
BOBOT
PEMBAYAR URAIAN KEGIATAN SAT VOLUME
(%)
AN
Err:509 Err:509
BAB I 0 Err:509 - Err:509
Err:509 Err:509
Err:509 Err:509
BAB II 0
Err:509 Err:509 Err:509 Err:509 Err:509
2.3.(1) 0 Err:509 20.00
2.3.(6) 0 Err:509 15.08
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509
Err:509 100
#VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
#VALUE! #VALUE! #VALUE!
90
Err:509 Err:509 Err:509 Err:509
Err:509 Err:509
80
Err:509
Err:509
Err:509 Err:509 Err:509
70
Err:509 60
40
30
Err:509
#VALUE! #VALUE!
20
Err:509
Err:509 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE!
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
(3)
Refference
### ###
1 Satu 1 Satuan 0
2 Dua 2 Puluhan 0
3 Tiga 3 Ratusan 0
4 Empat 4 Ribuan 0
5 Lima 5 Puluhan Ribu
### Dua belas ribu dua belas ribu
6 Enam 6 Ratusan Ribu1 Seratus seratus
7 Tujuh 7 Jutaan 0
8 Delapan 8 Puluhan Juta
### Sebelas juta sebelas juta
9 Sembilan 9 Ratusan Juta 2 Dua ratus dua ratus
10 Sepuluh ### Milyar 2 Dua milyar dua milyar
11 Sebelas ### Puluhan Milya3 Tiga puluh Tiga puluh
12 Dua belas ### Ratusan Mily 0
13 Tiga belas ### Trilyun 0
14 Empat belas ### Puluhan Trily 0
15 Lima belas ### Ratusan Trily 0
16 Enam belas
17 Tujuh belas
18 Delapan belas
19 Sembilan belas
# #
Empat juta Lima juta
rupiah # rupiah #
# Empat juta rupiah # # Lima juta rupiah #
(4) (5)
7 ### 7 ###
1 Satuan 0 1 Satuan 0
2 Puluhan 0 2 Puluhan 0
3 Ratusan 0 3 Ratusan 0
4 Ribuan 0 4 Ribuan 0
belas ribu 5 Puluhan Ribu0 5 Puluhan Ribu0
6 Ratusan Ribu0 6 Ratusan Ribu0
7 Jutaan 4 Empat juta Empat juta 7 Jutaan 5 Lima juta
8 Puluhan Juta 0 8 Puluhan Juta 0
9 Ratusan Juta 0 9 Ratusan Juta 0
### Milyar 0 ### Milyar 0
### Puluhan Milya0 ### Puluhan Milya0
### Ratusan Mily 0 ### Ratusan Mily 0
### Trilyun 0 ### Trilyun 0
### Puluhan Trily 0 ### Puluhan Trily 0
### Ratusan Trily 0 ### Ratusan Trily 0
ah #
(5)
Lima juta
Nomor : 012/SPH-DPU/XI/2016 Jakarta, 15 November 2016
Lampiran: 1 (satu) set
Kepada Yth :
Pokja Pengadaan Barang/Jasa Satuan Kerja Pelaksanaan Jalan Nasional Metropolitan I Jakarta ULP DKI Jakarta
Jalan Jatipadang Poncol No.38, Pasar Minggu, Jakarta Selatan
di
Jakarta
Sehubungan dengan pengumuman pendaftaran dan pengambilan Dokumen Pengadaan nomor : 01/Pokja/M1-01/I/2017
tanggal 28 Oktober 2016 dan setelah kami pelajari dengan seksama Dokumen Pengadaan danBerita Acara Pemberian
Penjelasan serta adendum Dokumen Pengadaan, dengan ini kami mengajukan penawaran untuk Pekerjaan Paket
Penggantian Jembatan Cacing B sebesar Rp. 32.211.112.000,- (Tiga puluh dua milyar dua ratus sebelas juta seratus dua
belas ribu rupiah) termasuk PPN.
Penawaran ini sudah memperhatikan ketentuan dan persyaratan yang tercantum dalam Dokumen Pengadaan untuk
melaksanakan pekerjaan tersebut di atas.
Penawaran ini berlaku selama 90 (Sembilan Puluh) hari kalender sejak batas akhir pemasukan penawaran.
Dengan disampaikannya Surat Penawaran ini, maka kami menyatakan sanggup dan akan tunduk pada semua
ketentuan yang tercantum dalam Dokumen Pengadaan serta Pokja ULP tidak terikat untuk menetapkan penawaran terendah
sebagai pemenang. Apabila dana dalam dokumen anggaran yang telah disahkan tidak tersedia atau tidak cukup tersedia
dalam DIPA/DPA Tahun Anggaran, maka Pengadaan Barang/Jasa dapat dibatalkan dan kami tidak akan menuntut ganti rugi
dalam bentuk apapun.
Jumlah Harga
No. Divisi Uraian Pekerjaan
(Rupiah)
I UMUM 3,404,928,900.00
II DRAINASE 14,032,000.00
III PEKERJAAN TANAH 486,271,800.00
IV PELEBARAN PERKERASAN DAN BAHU JALAN -
V PERKERASAN BERBUTIR DAN BETON SEMEN 1,035,570,200.00
VI PERKERASAN ASPAL 601,038,700.00
VII STRUKTUR 23,236,453,700.00
VIII PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR 468,361,000.00
IX PEKERJAAN HARIAN 16,173,600.00
X PEKERJAAN PEMELIHARAAN RUTIN 20,000,000.00
(A) Jumlah Harga 1 s/d 10 29,282,829,900.00
(B) PPN 10 % = 10 % x A 2,928,282,990.00
(C) Jumlah Total Harga 32,211,112,890.00
(D) Dibulatkan 32,211,112,000.00
Terbilang : # Tiga puluh dua milyar dua ratus sebelas juta seratus dua belas ribu rupiah #
Err:509 : Err:509 0
Urusan Pemerintahan :0 0
: Err:509
Err:509 : Err:509 Err:509
Kegiatan :0 0
Err:509 : Err:509
Err:509 : Err:509
Err:509 : Err:509
Err:509 : Err:509
Tahun Anggaran : 2016
Err:509 : Err:509
Waktu Pelaksanaan : Pelaksanaan 330 ( Tig 0
Err:509 : Err:509
Err:509 : Err:509
DIVISI - 1 UMUM
1.2.4.(a) Pekerjaan Kantor Direksi keet dengan lantai plesteran uk. 3 x 4 = 12 m2 12.00 m2
1.2.4 (b) Papan nama proyek bahan multiplek 8 mm uk.240 x 120 cm 2.00 bh
1.2.4 (c ) Cetak foto digital 72.00 lbr
DIVISI - 7 STRUKTUR
(4) (( 5 ) = ( 3 X 4 ))
215,000.00 2,580,000.00
325,000.00 650,000.00
1,500.00 108,000.00
3,338,000.00
3,500.00 5,888,295.00
#REF!
5,888,295.00
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
Harga Satuan Harga Jadi
( Rp ) ( Rp )
(4) (( 5 ) = ( 3 X 4 ))
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING - MASING HARGA SATUAN
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
1
JUMLAH HARGA BAHAN
C. PERALATAN
Item Pembayaran No :
Jenis Pekerjaan : (Floor Hardener 3 kg/m2)
Satuan Pembayaran : m2
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Item Pembayaran No : SS
Jenis Pekerjaan : Pemasangan paving block tipe 2 warna hitam
Satuan Pembayaran : m2
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Program :
Kegiatan : 0
Satuan : m3
Item Pekerjaan : Perkerasan Beton Ready Mix K. 250 Slump 12 t = 5 cm
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
TOTAL
HARGA SATUAN
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Item Pembayaran No :
Jenis Pekerjaan : (Bekisting Beton Pedestrian)
Satuan Pembayaran : Panel
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
2 Paku Kg 0.7500
Program :
Kegiatan : 0
Satuan : m3
Item Pekerjaan : Perkerasan Beton Ready Mix K. 250 Slump 12 t = 12 cm + Floor Hardener,
tulangan besi wire mesh M8
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
TOTAL
HARGA SATUAN
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
1
JUMLAH HARGA BAHAN
C. PERALATAN
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
Perkiraan
No Komponen Satuan
Kuantitas
(a) (b) (c) (d)
A TENAGA
5,000.00 5,000.00
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
1,000.00 1,000.00
1,000.00
#REF!
#REF!
#REF!
GA SATUAN
62,500.00 15,625.00
#REF!
15,625.00
#REF! #REF!
#REF!
1,000.00 1,000.00
1,000.00
#REF!
-
#REF!
Harga Satuan Jumlah Harga
(Rp) (Rp)
(e) (f)=((d)x(e))
#REF! #REF!
7,500.00 7,500.00
32,000.00 3,200.00
#REF!
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
GA SATUAN
Hardener 3 kg/m2
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
1,000.00 1,000.00
1,000.00
#REF!
-
#REF!
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
Harga Satuan Jumlah Harga
(Rp) (Rp)
(e) (f)=((d)x(e))
#REF! #REF!
#REF!
7,500.00 7,500.00
32,000.00 3,200.00
#REF!
#REF!
GA SATUAN
#REF! #REF!
#REF!
15,000.00 16,500.00
#REF!
16,500.00
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#VALUE!
#REF!
#REF!
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
-
#REF!
-
#REF!
GA SATUAN
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
-
#REF!
15 November 2016
BHA PRIMA UTAMA
MOS SITANGGANG
ektur Utama
DAFTAR KUANTITAS DAN HARGA
MATA
URAIAN PEKERJAAN SAT.
PEMBAYARAN
a b c
BAB I UMUM
1.2 Mobilisasi LS
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS
1.8 (2) Jembatan Sementara LS
1.21 Manajemen Mutu LS
Jumlah Harga Pekerjaan Bab I
BAB II DRAINASE
2.3.(1) Gorong-gorong pipa Beton Bertulang, diameter dalam 40 cm M'
2.3.(6) Gorong-gorong pipa Beton Tanpa Tulangan, diameter dalam 40 cm M'
Jumlah Harga Pekerjaan Bab II
BAB III PEKERJAAN TANAH
3.1.(1a) Galian Biasa M
3.1.(3) Galian Struktur dengan Kedalaman 0-2 meter M
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M
3.1.(9) Galian Perkerasan Beton M
3.2.(1a) Timbunan Biasa dari Sumber Galian M
3.2.(2a) Timbunan pilihan dari Sumber Galian M
3.2.(1b) Timbunan Biasa dari Galian M
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M
3.3.(1) Penyiapan Badan Jalan M
3.5.(2a) Geotekstil Separator Kelas 1 M
Jumlah Harga Pekerjaan Bab III
BAB IV PELEBARAN PERKERASAN DAN BAHU JALAN
Jumlah Harga Pekerjaan Bab IV
BAB V PERKERASAN BERBUTIR DAN BETON SEMEN
5.1.(1) Lapis Pondasi Agregat kelas A M
SKh 1.5.3 (2) Perkerasan Beton Semen untuk Permukaan Lalu-lintas Umur Beton Lebih dari 1
M
Hari dan Kurang dari 3 Hari
MATA
URAIAN PEKERJAAN SAT.
PEMBAYARAN
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah
MATA
URAIAN PEKERJAAN SAT.
PEMBAYARAN
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, tipe Merkuri 250 watt Buah
Jumlah Harga Pekerjaan Bab VIII
BAB IX PEKERJAAN HARIAN
9.1 (1) Mandor Jam
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan Ls
d e f = (d x e)
Bab IV
n Bab V 1,035,570,200.00
Lembar 1.2-1
HARGA SATUAN JUMLAH HARGA
No. U RAIAN SATUAN VOL.
(Rp.) (Rp.)
B. PERALATAN
Periksa lembar 1.2-2 44,500,000.00
E. MOBILISASI LAINNYA
E.I. PEKERJAAN DARURAT LS 1.00 10,000,000.00 10,000,000.00
1 Pemeliharaan Jalan Kerja / Samping
2
3
4
5
I. Laboratory Building
1. Laboratory Building m2 150.00 500,000.00 75,000,000.00
V. Peralatan pendukung
1 Mobil Pick Up
2 Komputer + Printer
3 Furniture
Lembar 1.2-2
KODE HARGA JUMLAH
No. JENIS ALAT ALAT SATUAN VOL. SATUAN HARGA
(Rp.) (Rp)
B. PERALATAN
1 BATCHING PLANT Unit 1.00 10,000,000.00 10,000,000.00
2 CRANE ON TRACK 75-100 TON Unit 1.00 7,000,000.00 7,000,000.00
3 COMPRESSOR 4000-6500 L\M Unit 1.00 1,000,000.00 1,000,000.00
4 CONCRETE MIXER 0.3-0.6 M3 Unit 10.00 500,000.00 5,000,000.00
5 DUMP TRUCK 10 TON Unit 13.00 500,000.00 6,500,000.00
6 EXCAVATOR 80-140 HP Unit 1.00 5,000,000.00 5,000,000.00
7 GENERATOR SET Unit 2.00 500,000.00 1,000,000.00
8 WHEEL LOADER 1.0-1.6 M3 Unit 1.00 3,000,000.00 3,000,000.00
9 CONCRETE VIBRATOR Unit 1.00 500,000.00 500,000.00
10 TAMPER Unit 1.00 500,000.00 500,000.00
11 JACK HAMMER Unit 1.00 500,000.00 500,000.00
12 WELDING SET Unit 1.00 500,000.00 500,000.00
13 TRAILER 20 TON Unit 1.00 3,000,000.00 3,000,000.00
14 BAR BENDER Unit 1.00 500,000.00 500,000.00
15 BAR CUTTER Unit 1.00 500,000.00 500,000.00
Total untuk Item B pada Lembar 1 44,500,000.00
ANALISA HARGA SATUAN
Item Pekerjaan : Manajemen dan Keselamatan Lalu Lintas
Satuan : LS
Mata Pembayaran : 1.8.(1)
HARGA SATUAN
PERKIRAAN
NO. URAIAN SATUAN DASAR
KUANTITAS
(Rp)
B URUTAN KERJA
1 Penyedia menyiapkan perlengkapan keselamatan jalan selama
peroide konstruksi sesuai ketentuan
2 Buat rencana kerja manajemen lalu-lintas sesuai schedule
pekerjaan dan koordinasikan dengan seluruh personil yang
terkait
3 Kelompok kerja pengatur lalu-lintas selama konstruksi
menggunakan tenaga pengatur dan flagman dengan 3 shift
4 Pengalihan arus lalu-lintas harus ijin PPK dan pihak terkait
5 Semua rambu harus jelas dan terbaca oleh Pengguna Jalan
D TENAGA/ PERSONIL
1 Pekerja (Flagman) OB 36.00 3,906,000.00
2 Koordinator / Pengatur OB 12.00 4,921,560.00
3,000,000.00
37,500,000.00
16,000,000.00
16,000,000.00
12,000,000.00
8,000,000.00
8,000,000.00
8,000,000.00
30,000,000.00
50,000,000.00
10,000,000.00
5,000,000.00
140,616,000.00
59,058,720.00
403,174,720.00
Item Pekerjaan : Jembatan Sementara
Mata Pembayaran : 1.8 (2)
HARGA
PERKIRAAN SATUAN
NO. URAIAN SATUAN
KUANTITAS DASAR
(Rp)
1,080,000,000.00
648,000,000.00
21,600,000.00
400,800,000.00
92,250,000.00
117,180,000.00
44,919,000.00
26,170,200.00
2,430,919,200.00
Item Pekerjaan : Manajemen Mutu
Satuan : LS
Mata Pembayaran : 1.21
PERKIRAAN
NO. URAIAN SATUAN
KUANTITAS
B URUTAN KERJA
1 Penyedia setelah menerima SPMK mengusulkan personil
Tenaga Ahli Mutu Pekerjaan sbg Manager Kendali Mutu
2 Tenaga Ahli dibantu oleh asisten Kendali Mutu yang
berpengalaman dibidangnya dan tenaga pendukung
3 Membuat RMK dan Laporan Mutu yang disetujui PPK
4 Melakukan pengendalian mutu semua pekerjaan dan membuat
laporan secara berkala
D TENAGA/ PERSONIL
8,000,000.00 96,000,000.00
4,000,000.00 48,000,000.00
5,000,000.00 60,000,000.00
2,000,000.00 24,000,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.9638 12,875.00 12,400.00
2 Tukang Jam 1.2048 15,250.00 18,300.00
3 Mandor Jam 0.1204 19,750.00 2,300.00
II Bahan / Material
1 Beton readymix Umur 3 Hari m3 1.0000 1,800,000.00 1,800,000.00
2 Baja tulangan U24 kg 15.8750 8,700.00 138,100.00
3 Baja tulangan U39 kg 0.7022 10,100.00 7,000.00
4 Joint sealant kg 0.9900 34,000.00 33,600.00
5 Cat anti karat kg 0.0200 35,000.00 700.00
6 Expansion cap m2 0.1700 6,000.00 1,000.00
7 Polytene 125 mikron kg 0.4000 6,000.00 2,400.00
8 Curing compound ltr 0.8700 35,000.00 30,400.00
9 Multipleks 12 mm lbr 0.0400 160,000.00 6,400.00
10 Kayu acuan m3 0.0240 1,200,000.00 28,800.00
11 Paku uk. 10 cm kg 0.2560 5,500.00 1,400.00
III Peralatan
1. Concrete vibrator Jam 0.4010 40,117.09 16,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 1.8472 18,600.00 34,300.00
2 Tukang Jam 1.0040 21,390.00 21,400.00
3 Mandor Jam 0.2343 24,924.00 5,800.00
II Bahan / Material
1 Beton readymix fc' 30 MPa slump 12 m3 1.0000 907,500.00 907,500.00
2 Bekisting ringan, expose multiplex tebal 9 mm m3 1.0000 1,700,000.00 1,700,000.00
3 Mengurug dengan pasir pasang padat m3 0.0293 235,000.00 6,800.00
III Peralatan
1 Concrete pump m3 0.1004 241,793.83 24,200.00
2 Air compressor Jam 0.2667 167,908.73 44,700.00
3 Concrete vibrator 2 buah Jam 0.0083 40,117.09 300.00
4 Genset Jam 0.1300 420,160.86 54,600.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 1.8472 18,600.00 34,300.00
2 Tukang Jam 1.0040 21,390.00 21,400.00
3 Mandor Jam 0.2343 24,924.00 5,800.00
II Bahan / Material
1 Beton readymix fc' 20 MPa slump 12 m3 1.0000 825,000.00 825,000.00
2 Bekisting ringan, expose multiplex tebal 9 mm m3 1.0000 1,700,000.00 1,700,000.00
III Peralatan
1 Concrete pump m3 0.1004 241,793.83 24,200.00
2 Air compressor Jam 0.2667 167,908.73 44,700.00
3 Concrete vibrator 2 buah Jam 0.0083 40,117.09 300.00
4 Genset Jam 0.1300 420,160.86 54,600.00
HARGA SATUAN
KUANTITAS/ HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
Sub jumlah I -
II Bahan / Material
1 Penyediaan Unit Pracetak Gelagar Type I bh 1.0000 110,000,000.00 110,000,000.00
Bentang 20 Meter
III Peralatan
HARGA SATUAN
KUANTITAS/ HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
Sub jumlah I -
II Bahan / Material
1 Penyediaan Unit Pracetak Gelagar Type I bh 1.0000 300,000,000.00 300,000,000.00
Bentang 50 Meter
III Peralatan
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1 Pekerja OH 0.0070 130,200.00 900.00
2 Tukang Besi OH 0.0070 149,730.00 1,000.00
3 Kepala Tukang OH 0.0007 164,052.00 114.00
4 Mandor OH 0.0004 174,468.00 69.00
II Bahan / Material
Baja tulangan U24 kg 1.0500 8,700.00 9,135.00
Kawat Beton kg 0.0150 15,000.00 225.00
III Peralatan
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1 Pekerja OH 0.0070 130,200.00 900.00
2 Tukang Besi OH 0.0070 149,730.00 1,000.00
3 Kepala Tukang OH 0.0007 164,052.00 114.00
4 Mandor OH 0.0004 174,468.00 69.00
II Bahan / Material
Baja tulangan U39 kg 1.0500 10,100.00 10,605.00
Kawat Beton kg 0.0150 15,000.00 225.00
III Peralatan
HARGA SATUAN
KUANTITAS/ HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Hari 0.3818 130,200.00 49,700.00
2. Mandor Hari 0.0382 174,468.00 6,600.00
II Bahan / Material
III Peralatan
1. ruck crane 25 ton Hari 1.0000 50,000,000.00 50,000,000.00
HARGA SATUAN
KUANTITAS/ HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Hari 0.3818 130,200.00 49,700.00
2. Mandor Hari 0.0382 174,468.00 6,600.00
II Bahan / Material
III Peralatan
1. ruck crane 25 ton Hari 1.0000 150,000,000.00 150,000,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
Sub jumlah I -
II Bahan / Material
Sub jumlah II -
III Peralatan
PILE DRIVER + HAMMER Jam 0.3560 313,137.52 111,476.00
CRANE ON TRACK 35 TON Jam 0.1254 937,500.00 117,562.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
Sub jumlah I -
II Bahan / Material
Sub jumlah II -
III Peralatan
DUMP TRUCK 10 TON Jam 0.5340 366,160.61 195,529.00
JACK HAMMER Jam 6.3760 34,473.55 219,803.00
Baja Tulangan U-
24 polos
0 28 28 21 49 21 70
0 28 49 70
CATATAN :
Kegiatan normal
Kegiatan kritis
Kegiatan dummy
Agregat Kelas A
28 56
28 56
NETWORK PLANN
Baja Tulangan U-
39 ulir
Beton f'c 10 Mpa Beton f'c 30 Mpa Perletakan Elastomerik Pemasangan PCI Girder
21 91 21 112 21 133 14
91 112 133
Sirtu Beton Fs 45 Kg/cm2
21 77 35
ngan Sheet Pile Bingkai Beton Mulur air Tail-tali air Trotoar Floor hardener
21 77 21 98 21 119 21 140 28
NNING
Beton f'c 20 Mpa Railling precast Pilar Railling precast
5 180
180
2016
UTAMA
GGANG
NETWORK PLANNING
Err:509
Err:509 Err:509
Err:509
13 29
III VII
12 16 16 32 7
Err:509
0
0
Err:509
Err:509 Err:509
7 11 13
VII
37
CATATAN :
Kegiatan normal
Kegiatan kritis
Kegiatan dummy
Ir
9
Serah
terim/PHO
57 60
VIII I
3 3 0
PEK. UMUM
Bongkaran /
Pembersihan
Jakarta, 15 November 2016
###
A. UPAH / TENAGA
1 org/HR/8 Jam
12,875.00
15,250.00
19,750.00
19,750.00
15,250.00
19,750.00
15,250.00
19,750.00
15,250.00
17,500.00
A. UPAH / TENAGA
1 org/HR/7' Jam
18,600.00
21,390.00
23,436.00
21,390.00
23,436.00
21,390.00
23,436.00
21,390.00
23,436.00
21,390.00
18,600.00
24,924.00
23,436.00
21,390.00
18,600.00
21,390.00
18,600.00
24,924.00
21,390.00
21,390.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja hari 0.0857 103,000.00 8,800.00
2. Mandor hari 0.0286 158,000.00 4,500.00
II Bahan / Material
Saluran terbuka type U (U-Ditch) precast m' 1.0000 1,100,000.00 1,100,000.00
1
fabric, Uk. 100-100 cm
2 Mengurug dengan pasir pasang padat m3 0.0500 235,000.00 11,700.00
Sub jumlah II 1,111,700.00
III Peralatan
1. Sewa Truck Crane + Operator Jam 0.2000 648,884.16 129,700.00
B. JASA
III Manajemen Proyek dan Perekayasaan
TKDN
Barang/Jasa Gabungan
19,033,839,435,000.00 19,033,839,435,000.00
3,513,939,588,000.00 3,513,939,588,000.00
22,547,779,023,000.00 22,547,779,023,000.00
3,513,939,588,000.00 3,513,939,588,000.00
3,221,111,289,000.00 3,221,111,289,000.00
6,735,050,877,000.00 6,735,050,877,000.00
29,282,829,900,000.00 29,282,829,900,000.00
N I H I L
TOTAL 0.00% -
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja OH 0.1587 103,000.00 16,300.00
2. Mandor OH 0.0397 158,000.00 6,200.00
II Bahan / Material
Tutup saluran u-ditch HD uk. 100-100 cm m' 1.0000 250,000.00 250,000.00
1
pabrikasi
III Peralatan
Satuan : M'
Mata Pembayaran : Err:509
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja hari 0.0857 103,000.00 8,800.00
2. Mandor hari 0.0286 158,000.00 4,500.00
II Bahan / Material
Saluran Box Culvert HD precast fabric, Uk. m' 1.0000 2,250,000.00 2,250,000.00
1
100-100 cm
2 pasir pasang padat m3 0.0500 235,000.00 11,700.00
Sub jumlah II 2,261,700.00
III Peralatan
1. Sewa Truck Crane + Operator Jam 0.2000 648,884.16 129,700.00
Satuan : M'
Mata Pembayaran : Err:509
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja hari 0.0857 103,000.00 8,800.00
2. Mandor hari 0.0286 158,000.00 4,500.00
II Bahan / Material
Saluran Box Culvert HD precast fabric, Uk. m' 1.0000 3,375,000.00 3,375,000.00
1
150-150 cm
2 Mengurug dengan pasir pasang padat m3 0.0750 235,000.00 17,600.00
Sub jumlah II 3,392,600.00
III Peralatan
1. Sewa Truck Crane + Operator Jam 0.2000 648,884.16 129,700.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.0136 12,875.00 100.00
2. Mandor Jam 0.0068 19,750.00 100.00
II Bahan / Material
III Peralatan
1. Excavator (termasuk operator alat berat) Jam 0.0068 532,358.85 3,600.00
2 Dump Truck Jam 0.2560 250,000.00 64,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.0136 12,875.00 100.00
2. Mandor Jam 0.0068 19,750.00 100.00
II Bahan / Material
1 Urugan Pilihan M3 0.5000 70,000.00 35,000.00
III Peralatan
1. Excavator (termasuk operator alat berat) Jam 0.0075 532,358.85 3,900.00
2 Dump Truck Jam 0.0145 250,000.00 3,600.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.0136 12,875.00 100.00
2. Mandor Jam 0.0068 19,750.00 100.00
II Bahan / Material
III Peralatan
1. Breaker (termasuk operator alat berat) Jam 0.5768 360,032.52 207,600.00
2 Excavator (termasuk operator alat berat) Jam 0.0068 532,358.85 3,600.00
3 Dump Truck Jam 0.3560 250,000.00 89,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.0496 12,875.00 600.00
2. Mandor Jam 0.0071 19,750.00 100.00
II Bahan / Material
1. Agregat kelas A m3 1.2586 257,800.00 324,400.00
III Peralatan
1 Motor Grader Jam 0.0043 464,956.69 1,900.00
2 Tandem Roller Jam 0.0134 508,627.32 6,800.00
3 Water Tanker Jam 0.0141 241,695.65 3,400.00
Sub jumlah III 12,100.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.0496 12,875.00 600.00
2. Mandor Jam 0.0071 19,750.00 100.00
II Bahan / Material
1. Agregat kelas C1 m3 1.2586 220,000.00 276,800.00
III Peralatan
1. Wheel Loader Jam 0.0071 360,778.47 2,500.00
2 Dump Truck Jam 0.0541 366,160.61 19,800.00
3 Motor Grader Jam 0.0043 464,956.69 1,900.00
4 Tandem Roller Jam 0.0107 508,627.32 5,400.00
5 Water Tanker Jam 0.0141 241,695.65 3,400.00
Sub jumlah III 33,000.00
Satuan : Err:509
Mata Pembayaran : Err:509
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 0.9638 12,875.00 12,400.00
2 Tukang Jam 1.2048 15,250.00 18,300.00
3 Mandor Jam 0.1204 19,750.00 2,300.00
II Bahan / Material
1 Beton readymix fc' 35 MPa slump 12 m3 1.0000 1,023,000.00 1,023,000.00
2 Baja tulangan U24 kg 15.8750 8,700.00 138,100.00
3 Baja tulangan U39 kg 0.7022 10,100.00 7,000.00
4 Joint sealant kg 0.9900 34,000.00 33,600.00
5 Cat anti karat kg 0.0200 35,000.00 700.00
6 Expansion cap m2 0.1700 6,000.00 1,000.00
7 Polytene 125 mikron kg 0.4000 6,000.00 2,400.00
8 Curing compound ltr 0.8700 35,000.00 30,400.00
9 Multipleks 12 mm lbr 0.0400 160,000.00 6,400.00
10 Kayu acuan m3 0.0240 1,700,000.00 40,800.00
11 Paku uk. 10 cm kg 0.2560 5,500.00 1,400.00
III Peralatan
1. Concrete vibrator Jam 0.4010 40,117.09 16,000.00
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1. Pekerja Jam 1.8472 12,875.00 23,700.00
2 Tukang Jam 1.0040 15,250.00 15,300.00
3 Mandor Jam 0.2343 19,750.00 4,600.00
II Bahan / Material
1 Beton readymix fc' 30 MPa slump 12 m3 1.0000 907,500.00 907,500.00
2 Wiremesh M8 kg 0.8818 8,700.00 7,600.00
III Peralatan
1 Concrete pump m3 0.1004 241,793.83 24,200.00
2 Air compressor Jam 0.2667 167,908.73 44,700.00
3 Concrete vibrator 2 buah Jam 0.0083 40,117.09 300.00
4 Genset Jam 0.1300 420,160.86 54,600.00
Satuan : Err:509
Mata Pembayaran : Err:509
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
II Bahan / Material
1 PC concrete railling motif precast fabric uk. bh 1.0000 1,600,000.00 1,600,000.00
1500x740x220
III Peralatan
Satuan : Err:509
Mata Pembayaran : Err:509
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
II Bahan / Material
1 PC concrete pilar railling motif precast fabric bh 1.0000 1,400,000.00 1,400,000.00
uk. 910x500x300
III Peralatan
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
II Bahan / Material
1 Penyediaan sheet pile flat type FPC 320-N-500 m' 1.0000 300,000.00 300,000.00
III Peralatan
1 Truck crane 25 ton hari 0.0076 796,875.00 6,056.00
KUANTITAS/
NO. URAIAN SATUAN
KOEFISIEN
Sub jumlah I
II Bahan / Material
1 Galian tanah biasa, dalam s.d. 1 m m3 0.4094
2 Angkutan truk kap. 4 - 5 m3 jarak > 20 km Jakarta Selatan, Timur, m3 0.4094
3 Pas. pondasi batu belah ad. 1 PC : 3 Psr m3 1.0000
4 Plesteran tebal 20 mm ad. 1 PC : 2 Psr + acian m2 0.9971
5 Suling2 PVC type AW dia. 0,75" @ 0,5 m' turap m' 1.4857
Sub jumlah II
III Peralatan
67,000.00 27,429.00
20,000.00 8,188.00
600,000.00 600,000.00
67,000.00 66,805.00
30,000.00 44,571.00
Satuan : M
Mata Pembayaran : 8.4.1
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1 Pekerja Jam 0.2334 12,875.00 3,000.00
2 Tukang Jam 0.0933 15,250.00 1,400.00
3 Mandor Jam 0.0466 19,750.00 900.00
II Bahan / Material
1 Bingkai beton precast readymix fc' 35 MPa bh 1.0000 47,000.00 47,000.00
tanpa tulangan uk. 18/22 x
2 Beton readymix fc' 10 MPa slump 12 m3 0.0052 685,000.00 3,500.00
III Peralatan
Satuan : M
Mata Pembayaran : 8.4.(10f)
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1 Pekerja Jam 0.2334 12,875.00 3,000.00
2 Tukang Jam 0.0933 15,250.00 1,400.00
3 Mandor Jam 0.0466 19,750.00 900.00
II Bahan / Material
1 Bingkai beton precast readymix fc' 35 MPa bh 1.0000 45,000.00 45,000.00
tanpa tulangan uk. 18/22 x
2 Beton readymix fc' 10 MPa slump 12 m3 0.0052 685,000.00 3,500.00
III Peralatan
Satuan : M
Mata Pembayaran : 8.4.(12)
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN DASAR
KOEFISIEN
(Rp) (Rp.)
Upah / Tenaga Kerja
I
1 Pekerja Jam 0.2334 12,875.00 3,000.00
2 Tukang Jam 0.0933 15,250.00 1,400.00
3 Mandor Jam 0.0466 19,750.00 900.00
II Bahan / Material
1 Tali-tali air beton bertulang precast fc' 35 bh 1.0000 450,000.00 450,000.00
MPa uk. 30x40x100 cm
2 Beton readymix fc' 10 MPa slump 12 m3 0.0096 685,000.00 6,500.00
III Peralatan
HARGA
KUANTITAS/ SATUAN HARGA
NO. URAIAN SATUAN
KOEFISIEN DASAR
(Rp) (Rp.)
Upah / Tenaga Kerja
I
II Bahan / Material
1 Penyediaan tiang pancang dia. 50 cm (MC m' 14.0000 0.00 0.00
min = 14 tm) bottom (9 m)
III Peralatan
MINGGU KE :
MATA Harga Satuan BOBOT
URAIAN KEGIATAN SAT VOLUME Jumlah Satuan Harga 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 7 hr 1 hr KET.
PEMBAYARAN (%)
Rp 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48
100
BAB I UMUM
1.2 Mobilisasi LS 1.00 342,835,000.00 342,835,000.00 1.171 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025 0.025
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 403,174,720.00 403,174,700.00 1.377 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029 0.029
1.8 (2) Jembatan Sementara LS 1.00 2,430,919,200.00 2,430,919,200.00 8.302 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198 0.198
1.21 Manajemen Mutu LS 1.00 228,000,000.00 228,000,000.00 0.779 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017 0.017
BAB II DRAINASE
2.3.(1) Gorong-gorong pipa Beton Bertulang, diameter dalam 40 cm M' 20.00 400,000.00 8,000,000.00 0.027 0.027
2.3.(6) Gorong-gorong pipa Beton Tanpa Tulangan, diameter dalam 40 cm M' 15.08 400,000.00 6,032,000.00 0.021 0.021 90
3.1.(1a) Galian Biasa M 793.88 70,000.00 55,571,600.00 0.190 0.038 0.038 0.038 0.038 0.038
3.1.(3) Galian Struktur dengan Kedalaman 0-2 meter M 965.12 80,000.00 77,209,600.00 0.264 0.066 0.066 0.066 0.066
3.1.(4) Galian Struktur dengan Kedalaman 2-4 meter M 264.92 150,000.00 39,738,000.00 0.136 0.034 0.034 0.034 0.034
3.1.(7) Galian Perkerasan Beraspal tanpa Cold Milling Machine M 16.88 300,000.00 5,064,000.00 0.017 0.017
3.2.(1a) Timbunan Biasa dari Sumber Galian M 595.94 120,000.00 71,512,800.00 0.244 0.244
80
3.2.(2a) Timbunan pilihan dari Sumber Galian M 349.25 250,000.00 87,312,500.00 0.298 0.298
3.2.(1b) Timbunan Biasa dari Galian M 90.23 100,000.00 9,023,000.00 0.031 0.031
3.2.(3a) Timbunan Pilihan (diukur diatas bak truk) M 174.15 250,000.00 43,537,500.00 0.149 0.149
SKh 1.5.3 (2) Perkerasan Beton Semen untuk Permukaan Lalu-lintas Umur Beton Lebih dari 1 Hari M 481.43 2,098,800.00 1,010,425,200.00 3.451 1.725 1.725
6.1.(2b) Lapis Perekat-Aspal Emulsi Liter 1,142.35 15,000.00 17,135,200.00 0.059 0.059
6.3.(5a) Laston Lapis Aus (AC-WC) Ton 424.04 1,350,000.00 572,454,000.00 1.955 1.955
6.3 (8) Bahan Anti Pengelupasan Kg 76.33 150,000.00 11,449,500.00 0.039 0.039
60
BAB VII STRUKTUR
7.1.(5) a Beton mutu sedang, fc' = 30 MPa Lantai Jembatan M 1,374.19 2,799,600.00 3,847,182,300.00 13.138 4.379 4.379 4.379
7.1.(5) b Beton mutu sedang, fc' = 30 MPa untuk Diafragma & Parapet M 321.00 2,799,600.00 898,671,600.00 3.069 1.534 1.534
7.1.(7) Beton mutu sedang, fc' = 20 MPa M 479.38 2,710,300.00 1,299,263,600.00 4.437 1.109 1.109 1.109 1.109
7.1.(8) Beton mutu sedang, fc' = 15 MPa M 88.38 1,700,000.00 150,246,000.00 0.513 0.513
7.1.(10) Beton mutu sedang, fc' = 10 MPa M 545.34 781,000.00 425,910,500.00 1.454 0.364 0.364 0.364 0.364
7.2 (1) g Penyediaan Unit Pracetak Gelagar Type I Bentang 20 Meter Buah 16.00 110,000,000.00 1,760,000,000.00 6.010 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401 0.401
7.2 (1) l Penyediaan Unit Pracetak Gelagar Type I Bentang 50 Meter Buah 8.00 300,000,000.00 2,400,000,000.00 8.196 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 0.546 50
7.2 (2) g Pemasangan Unit Pracetak Gelagar Type I Bentang 20 Meter Buah 16.00 50,056,300.00 800,900,800.00 2.735 0.912 0.912 0.912
7.2 (2) l Pemasangan Unit Pracetak Gelagar Type I Bentang 50 Meter Buah 8.00 150,056,300.00 1,200,450,400.00 4.100 1.367 1.367 1.367
7.3.(1) Baja Tulangan U-24 polos Kg 764.84 11,443.00 8,752,000.00 0.030 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
7.3.(4) Baja Tulangan U-39 ulir Kg 423,482.84 12,913.00 5,468,433,900.00 18.675 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747 0.747
7.6 (1) Fondasi Cerucuk, Penyediaan dan Pemasangan M 3,640.00 50,000.00 182,000,000.00 0.622 0.311 0.311
7.6 (18).b Pemancangan Tiang Pancang Beton Pratekan Pracetak Diameter 500 mm M 6,176.00 229,038.00 1,414,538,600.00 4.831 0.690 0.690 0.690 0.690 0.690 0.690 0.690
7.6 (22) Pengujian Pembebanan Pada Tiang dengan Diameter sampai 600 mm (PDA) Buah 6.00 30,000,000.00 180,000,000.00 0.615 0.307 0.307
7.9 (1) Pasangan Batu M 179.42 800,000.00 143,536,000.00 0.490 0.163 0.163 0.163
40
7.11 (1a) Expansion Joint Tipe Asphaltic Pluq (Fix) M 32.00 2,460,000.00 78,720,000.00 0.269 0.269
7.11 (1b) Expansion Joint Tipe Asphaltic Pluq (Move) M 32.00 2,460,000.00 78,720,000.00 0.269 0.269
7.12 (3) b Perletakan Elastomer Sintetis Ukuran 350 mm x 400 mm x 39 mm Buah 32.00 1,365,000.00 43,680,000.00 0.149 0.050 0.050 0.050
7.12 (3) g Perletakan Elastomer Sintetis Ukuran 450 mm x 600 mm x 102 mm Buah 16.00 5,508,000.00 88,128,000.00 0.301 0.100 0.100 0.100
7.14 (1) Papan Nama Jembatan Buah 2.00 5,000,000.00 10,000,000.00 0.034 0.034
7.15 (1) Pembongkaran Pasangan Batu M 65.70 400,000.00 26,280,000.00 0.090 0.090
7.15 (2) Pembongkaran Beton M 1,968.47 415,332.00 817,568,500.00 2.792 0.279 0.279 0.279 0.279 0.279 0.279 0.279 0.279 0.279 0.279
7.16 (1) Deck Drain (beserta Aksesorisnya tipe 1) Buah 20.00 4,000,000.00 80,000,000.00 0.273 0.137 0.137 30
7.16 (1)a Deck Drain (Steel Grating) Buah 6.00 5,000,000.00 30,000,000.00 0.102 0.051 0.051
7.16 (3) b Pipa Drainase PVC diameter 100 mm M 105.00 100,000.00 10,500,000.00 0.036 0.018 0.018
7.16 (3) d Pipa Drainase PVC diameter 200 mm M 169.40 300,000.00 50,820,000.00 0.174 0.087 0.087
7.16 (4) Pipa Penyalur PVC diameter 150 mm M 1,231.60 200,000.00 246,320,000.00 0.841 0.421 0.421
SK.7 18. (2) Pemancangan Corrugated Sheet Pile M 634.13 400,000.00 253,652,000.00 0.866 0.433 0.433
8.4.1 Marka Jalan Termoplastik M 209.83 200,000.00 41,966,000.00 0.143 0.048 0.048 0.048
20
8.4.(3b) Rambu Jalan Ganda dengan Permukaan Pemantul Engineer Grade Buah 2.00 5,000,000.00 10,000,000.00 0.034 0.011 0.011 0.011
8.4.(10a) Kerb Pracetak Jenis 1 (Peninggi/ Mountable) M 577.00 500,000.00 288,500,000.00 0.985 0.328 0.328 0.328
8.4.(10f) Kerb Pracetak Jenis 6 (Kerb dengan bukaan) Buah 48.00 1,000,000.00 48,000,000.00 0.164 0.055 0.055 0.055
8.4.(12) Perkerasan Blok Beton pada Trotoar dan Median M 140.79 500,000.00 70,395,000.00 0.240 0.080 0.080 0.080
8.4.(16) Unit Lampu Penerangan Jalan Lengan Tunggal, tipe Merkuri 250 watt Buah 19.00 500,000.00 9,500,000.00 0.032 0.011 0.011 0.011
9.1 (2) Pekerja Biasa Jam 250.00 18,600.00 4,650,000.00 0.016 0.016 10
9.1 (3) Tukang Kayu, Tukang Batu, dsb Jam 40.00 21,390.00 855,600.00 0.003 0.003
9.1 (4) Dump Truck 3-4 M Jam 25.00 366,160.61 9,154,000.00 0.031 0.031
9.1 (20) Jack Hammer Jam 15.00 34,473.55 517,100.00 0.002 0.002
10.1 (3) Pemeliharaan Rutin Selokan, Saluran Air, Galian dan Timbunan Ls 1.00 10,000,000.00 10,000,000.00 0.034 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
10.1 (4) Pemeliharaan Rutin Perlengkapan Jalan Ls 1.00 10,000,000.00 10,000,000.00 0.034 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001 0.001
RENCANA MINGGU 0.072 0.072 0.072 0.072 0.072 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.549 0.960 0.960 0.960 0.960 1.123 1.123 1.779 1.764 2.003 2.069 2.069 2.065 2.065 1.999 2.363 2.329 2.856 2.856 2.492 2.492 2.492 2.492 3.602 5.083 5.069 8.935 5.440 6.975 4.278 4.396 4.750 3.348 -
RENCNA KOMULATIF - 0.07 0.14 0.22 0.29 0.36 0.91 1.46 2.01 2.56 3.11 3.66 4.20 4.75 5.30 5.85 6.81 7.77 8.73 9.69 10.82 11.94 13.72 15.48 17.48 19.55 21.62 23.69 25.75 27.75 30.11 32.44 35.30 38.16 40.65 43.14 45.63 48.13 51.73 56.81 61.88 70.81 76.25 83.23 87.51 91.90 96.65 100.00 100.00
MINGGU
NO NAMA TENAGA SAT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Ket
7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 1 Hr
1 General Superintendent org
2 Ahli Pelaksana Konstruksi Jembatan org
3 Ahli Kendali Mutu org
MINGGU
NO NAMA ALAT SAT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Ket
7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 1 Hr
1 Wheel Loader Unit
2 Crane Unit
MINGGU
NO NAMA MATERIAL SAT. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 Ket
7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 1 Hr
1 Gorong-gorong beton bertulang dia. 40 cm M
2 Gorong-gorong beton dia. 20 cm M
3 Timbunan Biasa M
4 Timbunan Pilihan M
5 Geotekstil M
6 Agregat Kelas A M
7 Beton Umur 3 hari M
8 aspal Emulsi Liter
9 AC-WC Ton
10 Anti Pengelupasan Kg
11 Beton f'c = 30 Mpa M
12 Beton f'c = 20 Mpa M
13 Beton f'c = 15 Mpa M
14 Beton f'c = 10 Mpa M
MATA
URAIAN PEKERJAAN
PEMBAYARAN
a b
I. UMUM
1.2 Mobilisasi
1.8.(1) Manajemen dan Keselamatan Lalu Lintas
II. DRAINASE
5.3.1 b
Perkerasan jalan beton, FS 45 kg/cm2, lebar 3,5 m, tebal 25 cm, termasuk
bekisting,membran plastik, curing, joint sealent, tulangan dowel dan tiebars
MATA
URAIAN PEKERJAAN
PEMBAYARAN
VII. STRUKTUR
7.1.(5) Beton mutu sedang, fc' 30 Mpa + bekisting
Beton mutu sedang, fc' 30 MPa (PC concrete railling motifprecast fabric uk.
7.1.(5)b
1500x740x220 mm) lengkap sesuai gambar
Beton mutu sedang, fc' 30 MPa (PC concrete pilar railling motif precast fabric uk.
7.1.(5)b
910x500x300 mm) lengkap sesuai gambar
7.1.(7) Beton mutu sedang, fc' 20 Mpa
7.1.(10) Beton mutu rendah, fc' 10 Mpa
Penyediaan girder PCI L = 16,6 m; H 90 cm, fc' 50 MPa (precast fabric termasuk
7.2.(1).a
stressing lengkap)
7.2.(2).a Pemasangan girder PCI L = 16,6 m; H 90 cm, fc' 50 Mpa (precast fabric)
Penyediaan pelat berongga (voided slab) pracetak bentang 14,70 m'; H = 74 cm, fc'
7.2.(8) a
50 MPa (precast fabric termasuk stressing lengkap)
Penyediaan pelat berongga (voided slab) pracetak bentang 16,60 m'; H = 74 cm, fc'
7.2.(8)b
50 MPa (precast fabric termasuk stressing lengkap)
Pemasangan pelat berongga (voided slab) pracetak bentang 14,70 m'; H = 74 cm,
7.2.(9) a
fc' 50 MPa (precast fabric)
Pemasangan pelat berongga (voided slab) pracetak bentang 16,60 m'; H = 74 cm,
7.2.(9)b
fc' 50 MPa (precast fabric)
7.3.(1) Baja Tulangan U24 polos
7.3.(4) Baja Tulangan U39 ulir
7.3.(6) Anyaman Kawat yang Di las (Welded Wire Mesh M8)
7.6.(5) a Penyediaan sheet pile type FPC 220-N-500 (MC min = 13.80 tm)
7.6.(5) b Pemancangan sheet pile type FPC 220-N-500 (MC min = 13.80 tm)
7.6.(12)b Penyediaan tiang pancang beton prategang pracetak dia. 50 cm (MC min = 14 tm)
8.4.(10)k Mulut air uk. 18/22x25-60 K300, tulangan, arteri. Precast termasuk mortar
SPESIFIKASI TEKNIS
f = (d x e)
Tenaga
Pekerja = 1.1765 oh x 103,000.00 = 121,100.00
Tukang Batu = 0.5882 oh x 122,000.00 = 71,700.00
Kepala Tukang = 0.0294 oh x 158,000.00 = 4,600.00
Mandor = 0.0294 oh x 158,000.00 = 4,600.00
202,000.00
Peralatan
Alat Bantu Lain = 1.0000 ls x Err:509 = Err:509
Err:509
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m2 (dibulatkan) = Err:509
Tenaga
Pekerja/knek = 1.0000 oh x 103,000.00 = 103,000.00
Mandor/pengawas = 0.1000 oh x 158,000.00 = 15,800.00
118,800.00
Peralatan
Alat Bantu Lain = 1.0000 ls x Err:509 = Err:509
Err:509
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m2 (dibulatkan) = Err:509
BUAT PAGAR SEMENTARA DARI SENG GELOMBANG TINGGI 2 METER /M'
Bahan
Dolken Gelam dia 8-10 cm = 1.2500 btg x Err:509 = Err:509
Semen Tiga Roda @ 50 kg = 0.0500 zak x Err:509 = Err:509
Seng Gelombang 240 x 80 x 0.33 = 1.2000 lbr x Err:509 = Err:509
Pasir Beton = 0.0050 m3 x Err:509 = Err:509
Split = 0.0090 m3 x Err:509 = Err:509
Kaso 5/7 cm (Kayu Rimba Campuran) = 0.0720 m3 x Err:509 = Err:509
Paku 5 - 7 cm = 0.0600 kg x Err:509 = Err:509
Err:509
Tenaga
Pekerja = 0.2000 oh x 103,000.00 = 20,600.00
Tukang Batu = 0.4000 oh x 122,000.00 = 48,800.00
Kepala Tukang = 0.0200 oh x 158,000.00 = 3,100.00
Mandor/pengawas = 0.0200 oh x 158,000.00 = 3,100.00
75,600.00
Peralatan
Alat Bantu Lain = 1.0000 ls x Err:509 = Err:509
Err:509
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m2 (dibulatkan) = Err:509
Tenaga
Pekerja/knek = oh x = -
Mandor/pengawas = oh x = -
-
Peralatan
Alat Bantu Lain = 1.0000 ls x Err:509 = Err:509
Err:509
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/ set (dibulatkan) = Err:509
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m' (dibulatkan) = Err:509
GALIAN TANAH BIASA SEDALAM 1 METER /M3
Tenaga
Pekerja/knek = 0.7500 oh x 103,000.00 = 77,200.00
Mandor/pengawas = 0.0250 oh x 158,000.00 = 3,900.00
81,100.00
Jumlah = 81,100.00
Jasa dan Overhead 10% = 8,110.00
Total = 89,210.00
Harga/m3 = 89,210.00
Jumlah = 99,800.00
Jasa dan Overhead 10% = 9,980.00
Total = 109,780.00
Harga/m3 = 109,780.00
Jumlah = 118,600.00
Jasa dan Overhead 10% = 11,860.00
Total = 130,460.00
Harga/m3 = 130,460.00
Tenaga
Pekerja = 1.2000 oh x 103,000.00 = 123,600.00
Tukang Batu = 0.2000 oh x 122,000.00 = 24,400.00
Kepala Tukang = 0.0200 oh x 158,000.00 = 3,100.00
Mandor/pengawas = 0.0600 oh x 158,000.00 = 9,400.00
160,500.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m3 = Err:509
PEKERJAAN BETON K225 /M3
Bahan
Semen Tiga Roda @ 50 kg = 7.4200 m3 x Err:509 = Err:509
Pasir Beton = 0.4986 m3 x Err:509 =
Split = 0.7756 m3 x Err:509 =
Air bersih = 215.0000 ltr x Err:509 =
Err:509
Tenaga
Pekerja = 1.6500 oh x 103,000.00 = 169,900.00
Tukang Batu = 0.2750 oh x 122,000.00 = 33,500.00
Kepala Tukang = 0.0280 oh x 158,000.00 = 4,400.00
Mandor/pengawas = 0.0830 oh x 158,000.00 = 13,100.00
220,900.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m3 = Err:509
Tenaga
Pekerja = 1.6500 oh x 103,000.00 = 169,900.00
Tukang Batu = 0.2750 oh x 122,000.00 = 33,500.00
Kepala Tukang = 0.0280 oh x 158,000.00 = 4,400.00
Mandor/pengawas = 0.0830 oh x 158,000.00 = 13,100.00
220,900.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga/m3 = Err:509
Tenaga
Pekerja = 0.0700 Jam x 12,875.00 = 900.00
Tukang Batu = 0.0700 Jam x 15,250.00 = 1,000.00
Kepala Tukang = 0.0070 Jam x 19,750.00 = 100.00
Mandor/pengawas = 0.0040 Jam x 19,750.00 = 79.00
2,079.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga /kg = Err:509
PASANG SULING-SULING PIPA PVC DIA 2" PJG 50 CM /TTK
Bahan
Pipa PVC dia 2" type AW panjang 4 m = 0.1500 btg x Err:509 = Err:509
Err:509
Tenaga
Pekerja = 0.0333 oh x 103,000.00 = 3,400.00
Mandor/pengawas = 0.0033 oh x 158,000.00 = 500.00
3,900.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga /kg = Err:509
Tenaga
Pekerja = 0.5200 oh x 103,000.00 = 53,500.00
Tukang Batu = 0.2600 oh x 122,000.00 = 31,700.00
Kepala Tukang = 0.0260 oh x 158,000.00 = 4,100.00
Mandor/pengawas = 0.0260 oh x 158,000.00 = 4,108.00
93,408.00
Jumlah = Err:509
Jasa dan Overhead 10% = Err:509
Total = Err:509
Harga /kg = Err:509
Jumlah = 739,300.00
Jasa dan Overhead 10% = 73,930.00
Total = 813,230.00
Harga /kg = 813,230.00
Jumlah = 332,700.00
Jasa dan Overhead 10% = 33,270.00
Total = 365,970.00
Harga /kg = 365,970.00
Jumlah = 130,700.00
Jasa dan Overhead 10% = 13,070.00
Total = 143,770.00
Harga /kg = 143,770.00
ANALISA HARGA SATUAN JADI - PERKERASAN BETON
Satuan : Err:509
TOTAL
JUMLAH HARGA
KET
(Rp.)
Err:509
Err:509
ANALISA HARGA SATUAN JADI - BETON, BESI, DAN BEKISTING
Satuan : Err:509
TOTAL
JUMLAH HARGA
KET
(Rp.)
Err:509
Err:509
ANALISA HARGA SATUAN JADI - BETON, BESI, DAN BEKISTING
Satuan : Err:509
TOTAL
JUMLAH HARGA
KET
(Rp.)
Err:509
Err:509
ANALISA HARGA SATUAN JADI - BETON, BESI, DAN BEKISTING
Satuan : Err:509
TOTAL
JUMLAH HARGA
KET
(Rp.)
Err:509
Err:509
ANALISA HARGA SATUAN JADI - BETON, BESI, DAN BEKISTING
Satuan : Err:509
TOTAL
JUMLAH HARGA
KET
(Rp.)
Err:509
Err:509
JADWAL WAKTU PELAKSANAAN
60 (enam puluh) Hari Kalender
Urusan Pemerintahan : 0
Kegiatan : 0
Tahun Anggaran : 2016
MINGGU KE-
NO U R A I A N VOLUME SAT HARGA JADI (Rp.) BOBOT % 1 2 3 4 5 6 7 8
7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr 7 Hr
Err:509
BAB I 0 - Err:509 - Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
1.2 0 1.00 Err:509 342,835,000.00 #VALUE!
Err:509 Err:509 Err:509 Err:509 Err:509 #VALUE! #VALUE!
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509
MINGGU KE-
9 Ket
4 Hr
100
Ch a rt T i tl e
Err:509
#VALUE! 90
#VALUE!
80
70
60
50
40
30
20
10
Err:509
Err:509
Jakarta, 15 November 2016
PT. DAMBHA PRIMA UTAMA
NAMA KEGIATAN
Err:509
Direktur Utama
Dra. Rita Ellen Tobing
Kepala Proyek
Saut Saidi H.S, ST
Tenaga Ahli
ONASIS C.R, ST
Logistik Pelaksana
M. Rian Hidayat Jinles Rajagukguk
PEKERJA
Adm
Marissa Rirezky M
Mandor
Tugimin
15 November 2016
HA PRIMA UTAMA
MOS SITANGGANG
ektur Utama
DAFTAR PERALATAN YANG AKAN DIGUNAKAN
DALAM PELAKSANAAN PEKERJAAN
## # #REF!
##
NO JENIS PEKERJAAN
I PEKERJAAN PERSIAPAN
2 Penebangan Pohon
C. SALURAN PHB CITRA 1
C.1. PEKERJAAN SALURAN DAN JALAN INSPEKSI PHB CITRA
1, ANTARA PR. 0 - 2
1 Pengukuran dan pemasangan bouplank tiap jarak 10 m'
2 Galian tanah biasa sedalam < 1 m
3 Cor beton lantai kerja ad. 1:3:5 atau setara B0 t = 5 cm
4 Cor saluran beton readymix K-225, Besi 80.98 kg/m3,
Bekisting Ringan Eksposed 2x Pakai.
5 Cor jalan inspeksi beton readymix K-225, Besi 130.62 kg/m3,
Bekisting Ringan Eksposed 2x Pakai.
6 Angkutan ready mix dengan tenaga orang, jarak 200 m
7 Angkutan Dump Truck kap. 4-5 m3 jarak s.d. 20 km
C.2. PEKERJAAN PENUNJANG
1 Pagar pengaman dg seng gelombang, tinggi min 1,8 m dg
rangka kayu
2 Penebangan Pohon
NO JENIS PEKERJAAN
IFIKASI TEKNIS
SPESIFIKASI TEKNIS
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
SPESIFIKASI TEKNIS
SESUAI SPESIFIKASI
RENCANA
SPESIFIKASI TEKNIS
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
SESUAI SPESIFIKASI
RENCANA
Err:509
Err:509
SPESIFIKASI TEKNIS
Err:509
Err:509
FLOW CHART PENGENDALIAN TEKNIS PEKERJAAN
PEKERJAAN JEMBATAN KEDAUNG (LANJUTAN)
START
Kontrak Kerja
Koordinasi dgn
Perizinan dengan Pi
Pihak Owner & Pemahaman Kontrak
Terkait
Konsultan Pengawas
Pelaksanaan Item
Pekerjaan
Rekayasa Engineer & Pelaksanaan Item
MCO Pekerjaan Berikutnya
PELAKSANAAN NO
PEKERJAAN OK
Request Item Pekerjaan
Berikutnya dan
Seterusnya
Request
Pelaksanaan Item
Pekerjaan Berikutnya
Pelaksanaan Item dan Seterusnya
Pekerjaan NO
OK
NO FINIS
OK Item Pekerjaan
Request
Berikutnya
H
NO
OK
FLOW CHART PERSIAPAN GAMBAR PELAKSANAAN
START
Mobilisasi
Check
Pelaksanaan
Repair
Check
Using
FINISH
Reference to Next
Construction
BAGAN ALIR PELAKSANAAN KONSTRUKSI
START
tidak
Check
ya
Scope Pekerjaan
Pemeriksaan Bersama
Scope Kontrak Pemeliharaan
Tidak
Check
ya Perbaikan
Pembuatan Gambar
Pelaksanaan/ Rekayasa FINISH
Engineer
Tidak
Check ya
Gambar
Pelaksanaan
Pelaksanaan
Pekerjaan / Fisik
As Built Jakarta, 15 Novemb
Drawing Tidak Err:509
Check ya
Tidak
Check
ya Pekerjaan
selesai
Ir. FERDAMOS SITA
Direktur Utam
FLOW CHART / BAGAN ALIR PELAKSANAAN PEKERJAAN SECARA KESELURUH
START
Kontrak Kerja
Mobilisasi &
Demobilisasi
Metode Pelaksanaan
Shop Drawing
Pekerjaan
PEK. DRAINASE
NO
OK Check
PEK. TANAH
NO
Check
OK
PEK. BERBUTIR
PEKERJAAN NO
UTAMA/STRUKTU Check
R OK
NO
Check A
OK
Pekerjaan Bongkaran
Beton & Bingkai Beton
+ Buang
NO NO Check OK
Check Pasang bingkai beton
OK
baru ukuran 18/22 x 25
- 60 K300
Pasang bingkai beton
baru ukuran 18/22 x 25
Kerb Pracetak (mulut air) uk. 18/22 x
- 60 K300
OK
25 - 60 K - 300, tulangan, arteri
/precast Check NO
OK
NO Pasang trotoar lapisan bawah baha
Check sirtu tebal 9 cm, pasir tebal 5 cm
termasuk conblock 4.6 Merah -
Hitam K400
OK
NO Check
OK
F I N I S H
EKNIS PEKERJAAN
AN)
Pelaksanaan Item
Pekerjaan
Compare dan checking terhadap tender
drawing (dokumen tender)
Perubahan
Perijinan dgn Pihak terkait
Pemeliharaan
Ya
Perbaikan
Tidak
Serah Terima Akhir
(PHO)
FINISH
NO
NO
NO
F I N I S H
ANALISA HARGA SATUAN PEKERJAAN
HARGA
PERKIRAAN
No. KOMPONEN SATUAN
KUATITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
12,875.00
1,975.00
14,850.00
Err:509
8,640.00
21,250.00
Err:509
Err:509
Err:509
Err:509
ANALISA HARGA SATUAN PEKERJAAN
JENIS PEKERJAAN : Pembuatan Pagar Sementara dari aeng gelombang Tinggi 2 Meter/M'
SATUAN PEMBAYARAN : bh
HARGA
PERKIRAAN
No. KOMPONEN SATUAN
KUATITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
2,575.00
7,900.00
395.00
395.00
11,265.00
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
Err:509
1,000.00
Err:509
Err:509
Err:509
FORMULIR STANDART UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
### : Err:509
:
ITEM PEMBAYARAN NO. : Analisa Pendukung Item Pekerjaan no 8.4.10c
JENIS PEKERJAAN : Beton Tali-Tali Air mutu sedang (K 225) + bekistingsedang (K 225) + bekisting
SATUAN PEMBAYARAN : M3
HARGA
PERKIRAAN
No. KOMPONEN SATUAN SATUAN
KUATITAS
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
1,000.00
#REF!
#REF!
#REF!
#REF!
FORMULIR STANDART UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
### : Err:509
:
ITEM PEMBAYARAN NO. : Pendukung Analisa Item Pekerjaan no. 7.1.(7a) & 8.4.10c
JENIS PEKERJAAN : Baja Tulangan U.24 Polos
SATUAN PEMBAYARAN : Kg
PERKIRAAN
No. KOMPONEN SATUAN
KUATITAS
A. TENAGA
B. BAHAN
C. PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
#REF! #REF!
#REF!
#REF! #REF!
#REF!
100.00 100.00
100.00
#REF!
D #REF!
#REF!
FORMULIR STANDART UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
### : Err:509
:
ITEM PEMBAYARAN NO. : Pendukung Analisa Item Pekerjaan no. 7.1.(7a) & 8.4.10c
JENIS PEKERJAAN : Bekisting beton jepit
SATUAN PEMBAYARAN : Panel
HARGA
PERKIRAAN
No. KOMPONEN SATUAN
KUATITAS SATUAN
(Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
JUMLAH
HARGA
(Rp.)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
FORMULIR STANDART UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
### : Err:509
:
ITEM PEMBAYARAN NO. : Pendukung Analisa Item Pekerjaan no 7.1.(7a)
PERKIRAAN
No. KOMPONEN SATUAN
KUATITAS
A. TENAGA
B. BAHAN
C. PERALATAN
RGA SATUAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
#REF! #REF!
#REF!
#REF! #REF!
#REF!
#REF!
D #REF!
#REF!