Anda di halaman 1dari 224

DAFTAR HARGA SATUAN PEKERJAAN LELANG

ANALISA BIAYA KONSTRUKSI


STANDAR NASIONAL INDONESIA
TAHUN 2010

PEMERINTAH KABUPATEN SRAGEN


DINAS PEKERJAAN UMUM
Jl. Dr. Setyabudi No. 3 Telepon (0271) 891011 Sragen
RAB TOTAL
Err:509 <= angka
0 <= jumlah desimal
<="b" atau "saja"
Err:509
Err:509
Err:509 Err:509
Err:509
Err:509 Err:509
Err:509 Err:509
1 Err:509
Err:509 Err:509
Err:509 Err:509 Nama Range yang ada :
Err:509 Err:509 NUMBER A1
Err:509 Err:509 NUMTEXT A1..A5
Err:509 Err:509 TEXT A5 Err:509
Err:509 Err:509 \T B9
Err:509 Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
Err:509 Err:509
1 Err:509 Err:509
0
1 satu
2 dua
3 tiga
4 empat
5 lima
6 enam
7 tujuh
8 delapan
9 sembilan
10 sepuluh
11 sebelas
12 dua belas
13 tiga belas
14 empat belas
15 lima belas
16 enam belas
17 tujuh belas
18 delapan belas
19 sembilan belas
20 dua puluh
30 tiga puluh
40 empat puluh
50 lima puluh
60 enam puluh
70 tujuh puluh
80 delapan puluh
90 sembilan puluh
Perhatian : Masukkan angka di sel A1
Baca terbilangnya di sel A4 atau A5 atau A7 atau D10
PERENCANAAN
PEKERJAAN

PROGRAM
PROGRAM PENGELOLAAN TEMPAT IBADAH

KEGIATAN
PEMBANGUNAN MASJID AL HIKMAH

SUMBER DANA
SWADAYA MASYARAKAT

LOKASI
KEC. MASARAN
REKAPITULASI
PROGRAM : PROGRAM PENGELOLAAN TEMPAT IBADAH
KEGIATAN : PEMBANGUNAN MASJID AL HIKMAH

LOKASI : DK. PLOSOREJO DS. SEPAT KEC. MASARAN


TH. ANGG. : 2013

NO URAIAN PEKERJAAN JUMLAH HARGA ( Rp.)

A PEKERJAAN PERSIAPAN 650,000.00


B PEKERJAAN MASJID =
1 PEKERJAAN TANAH 43,189,048.32
2 PEKERJAAN BETON 52,820,589.62
3 PEKERJAAN PEMBESIAN 148,594,664.74
4 PEKERJAAN BEGESTING 79,325,980.85
5 PEKERJAAN PASANGAN 199,214,334.39
6 PEKERJAAN ATAP dan PLAFOND 151,648,100.00
7 PEKERJAAN PINTU 66,574,033.19
8 PEKERJAAN LISTRIK 3,162,500.00
9 PEKERJAAN CAT-CATAN 28,707,556.40
C Err:509
1 Err:509 Err:509
2 Err:509 Err:509
3 Err:509 Err:509
4 Err:509 Err:509
5 Err:509 Err:509
6 Err:509 Err:509
D Err:509 Err:509

###
JUMLAH Err:509
PPN 11 % Err:509
TOTAL Err:509

DIBULATKAN Err:509
Terbilang :
Err:509

Sragen, 10 April 2023 Direktur


CV DAHIN ADILTHA BASTANTA
Fisik
Perencanaan
Pengawasan
Honor TPH
KASINO Total
Direktur

Direktur

Fisik
Perencanaan
Pengawasan
Honor TPHP
Total
PROGRAM : PROGRAM PENGELOLAAN TEMPAT IBADAH
KEGIATAN : PEMBANGUNAN MASJID AL HIKMAH
LOKASI : DK. PLOSOREJO DS. SEPAT KEC. MASARAN
SUMBER DANA : APBD II
TAHUN : 2023

HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN JUMLAH
Rp

A PEKERJAAN PERSIAPAN

1 Papan Nama Proyek 1.00 ls Taksir 200,000.00 200,000.00


2 Air kerja dan Listrik kerja 1.00 ls Taksir 300,000.00 300,000.00
3 Bongkaran dan Pembersihan Lokasi 2.00 lkl Taksir 900,000.00 1,800,000.00
4 Administrasi Dan Dokumentasi 1.00 ls Taksir 900,000.00 900,000.00
5 Penyelengaraan K3 -
1. Papan MMT Informasi Dan Promosi K3 1.00 ls Taksir 100,000.00 100,000.00
2. Alat pelindung kerja dan Alat Pelindung Diri 1.00 ls Taksir 100,000.00 100,000.00
3. P3K ( Tempat Obat +Obat -Obatan ) 1.00 ls Taksir 100,000.00 100,000.00
JUMLAH 3,500,000.00
B PEKERJAAN PASANGAN DINDING DAN LANTAI

1 Pekerjaan Pasangan Batu Bata 1/2 batu 14.40 m2 A.4.4.1.12 119,821.63 1,725,431.47
2 Pengelupasan Plesteran Lama 20.88 m2 Taksir 7,350.00 153,468.00
3 Pekerjaan plesteran 1pc : 8ps 49.68 m2 A.4.4.2.8 62,671.48 3,113,519.13
4 Acian Baru 49.68 m2 A.4.4.2.27 37,620.00 1,868,961.60
JUMLAH 6,861,380.20
C PEKERJAAN PINTU DAN JENDELA DAN AKSESORIS

1 Pasang Kusen boven Kayu jati KLS II 0.40 m3 A.4.6.1.2.1 17,768,015.10 7,107,206.04
2 Pasang kaca bening 5mm 10.56 m2 A.4.6.2.17 143,376.42 1,514,055.00
3 Pemasangan kunci tanam kelas II 2.00 bh A.4.6.2.2.1 212,873.10 425,746.20
JUMLAH 9,047,007.24
D PEKERJAAN ATAP

1 Pasang kuda-kuda baja doble Canal C 120x50x20x2.3mm skor baja siku 2.00 bh dihitung
5,000,000.00 10,000,000.00
2 Pekerjaan tambal sulam Gording dan Murplat kayu jati 8/12 kayu kls II 0.26 m3 A.4.6.1.15.1
12,805,551.00 3,329,443.26
3 Pekerjaan tambal sulam Usuk 5/7 Kayu jati 124.74 m2 A.4.6.1.16.2
127,526.85 15,907,699.27
4 Pekerjaan pasang Reng 2/4 Kayu jati 226.80 m2 A.4.6.1.16.2.1
38,272.41 8,680,182.59
5 Pekerjaan Pemasangan Atap Genteng magas 226.80 m2 A.4.5.2.2.2
80,124.00 18,172,123.20
6 Pekerjaan Pemasangan Bubungan Atap 18.00 m' A.4.5.2.36.1
134,519.00 2,421,342.00
7 Pekerjaan Pemasangan Listplang GRC 9/200 48.60 m' dihitung
45,708.85 2,221,450.11
JUMLAH 60,732,240.43
E PEKERJAAN LANGIT-LANGIT

1 Pasang Plafond PVC 84.38 m2 dihitung


175,000.00 14,766,500.00
2 Pemasangan list pvc 64.40 m' dihitung
35,000.00 2,254,000.00
JUMLAH 17,020,500.00
F PEKERJAAN PENGECATAN

1 Pekerjaan Pengecatan Dinding Interior 363.90 m2 A.4.7.1.10.1


19,660.21 7,154,350.42
HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN JUMLAH
Rp
2 Pekerjaan Pengecatan kayu, Lisplank dan kuda2 67.11 m2 A.4.7.1.4
44,214.52 2,967,236.44
JUMLAH 10,121,586.86
G PEKERJAAN MEKANIKAL ELEKTRIKAL

1 Instalasi listrik kabel dalam conduit 10.00 Titik taksir


65,000.00 650,000.00
2 Pasang Lampu PL 14 W Feteng Biasa 10.00 Bh R.004.a.
95,150.00 951,500.00
3 Stop kontak Dinding 2.00 Bh R.007.a.
39,380.00 78,760.00
4 Pasang Saklar Ganda 2.00 Bh R.006.a.
43,230.00 86,460.00
5 Pasang Saklar Tunggal 1.00 Bh R.006.b.
37,730.00 37,730.00
JUMLAH 1,804,450.00
H PEKERJAAN MEBELER
Pembesian Kolom 250/500, K 225
1 Almari 2.00 bh Taksir
1,500,000.00 3,000,000.00
2 Meja guru 3.00 bh Taksir
850,000.00 2,550,000.00
3 Kursi guru 2.00 bh Taksir
310,000.00 620,000.00
4 Papan tulis 2 muka (1muka melamin putih) 2.00 bh Taksir
500,000.00 1,000,000.00
5 Papan absen 2.00 bh Taksir
250,000.00 500,000.00
JUMLAH
7,670,000.00
JUMLAH TOTAL 116,757,164.72

PAJAK PPN 11% 12843288.118848

JUMLAH TOTAL DAN PAJAK 129,600,452.84


HARGA
NO URAIAN PEKERJAAN VOLUME SAT ANALISA SATUAN JUMLAH
Rp

Sragen, 10 April 2023


CV DAHIN ADILTHA BASTANTA

KASINO
Direktur
RENCANA ANGGARAN BIAYA ( RAB)
PROGRAM : PROGRAM PENGELOLAAN TEMPAT IBADAH
KEGIATAN : PEMBANGUNAN MASJID AL HIKMAH
LOKASI : DK. PLOSOREJO DS. SEPAT KEC. MASARAN

NO URAIAN PEKERJAAN VOLUME SAT ANALISA HARGA SATUAN


Rp.
1 2 3 4 5 6.00
A PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Ls Taksir 150,000.00
2 Pengukuran dan bowplank 1.00 Ls Taksir 500,000.00
JUMLAH
B PEKERJAAN MASJID
I PEKERJAAN TANAH
1 Galian tanah pondasi 21.96 M3 2.3.1.1. 86,075.00
2 Urugan tanah kembali 21.96 M3 2.3.1.9 28,691.67
3 Urugan tanah dipadatkan 360.00 M3 A.1.5.1.32. 100,375.00
4 Urugan pasir 22.32 M3 A.1.5.1.25. 203,126.00
JUMLAH
II PEKERJAAN BETON
1 Cor beton lantai kerja, K -100 2.35 M3 A.4.1.1.1. 883,342.57
2 Cor Footplat 100/100, K-175 4.78 M3 A.4.1.1.5. 973,325.43
3 Cor Foot Plat 80/80, K-175 4.18 M3 A.4.1.1.5. 973,325.43
4 Cor Sloof 20/30 K-175 9.48 M3 A.4.1.1.5. 973,325.43
5 Cor Kolom 30/30 K-175 5.40 M3 A.4.1.1.5. 973,325.43
6 Cor Kolom 20/20 K-175 2.88 M3 A.4.1.1.5. 973,325.43
7 Cor Kolom Praktis 12/15 K-175 0.86 M3 A.4.1.1.5. 973,325.43
8 Cor Balok Latei 12/12 K-175 1.15 M3 A.4.1.1.5. 973,325.43
9 Cor Ringbalk 20/225 K-175 4.90 M3 A.4.1.1.5. 973,325.43
10 Cor Balok Kuda kuda 20/35 4.13 M3 A.4.1.1.5. 973,325.43
11 Cor Rabat Beton Lantai K-100 15.84 M3 A.4.1.1.1. 883,342.57
JUMLAH
III PEKERJAAN PEMBESIAN
1 Pembesian Cor Footplat 100/100, K-175 644.76 Kg A.4.1.1.29 13,389.46
2 Pembesian Cor Foot Plat 80/80, K-175 563.76 Kg A.4.1.1.29 13,389.46
3 Pembesian Cor Sloof 20/30 K-175 1232.40 Kg A.4.1.1.29 13,389.46
4 Pembesian Cor Kolom 30/30 K-175 810.00 Kg A.4.1.1.29 13,389.46
5 Pembesian Cor Kolom 20/20 K-175 432.00 Kg A.4.1.1.29 13,389.46
6 Pembesian Cor Kolom Praktis 12/15 K-175 95.04 Kg A.4.1.1.29 13,389.46
7 Pembesian Cor Balok Latei 12/12 K-175 126.72 Kg A.4.1.1.29 13,389.46
8 Pembesian Cor Ringbalk 20/225 K-175 6615.00 Kg A.4.1.1.29 13,389.46
9 Pembesian Cor Balok Kuda kuda 20/35 578.20 Kg A.4.1.1.29 13,389.46
JUMLAH
IV PEKERJAAN BEGESTING
1 Begesting Cor Footplat 100/100, K-175 28.32 M2 A.4.1.1.31 127,445.29
2 Begesting Cor Foot Plat 80/80, K-175 31.68 M2 A.4.1.1.33 123,673.63
3 Begesting Cor Sloof 20/30 K-175 94.80 M2 A.4.1.1.33 123,673.63
4 Begesting Cor Kolom 30/30 K-175 72.00 A.4.1.1.23 235,782.69
5 Begesting Cor Kolom 20/20 K-175 57.60 A.4.1.1.23 235,782.69
6 Begesting Cor Kolom Praktis 12/15 K-175 11.52 A.4.1.1.23 235,782.69
7 Begesting Cor Balok Latei 12/12 K-175 19.20 M2 A.4.1.1.24 240,366.24
8 Begesting Cor Ringbalk 20/225 K-175 39.20 M2 A.4.1.1.24 240,366.24
9 Begesting Cor Balok Kuda kuda 20/35 53.10 M2 A.4.1.1.24 240,366.24
JUMLAH
V PEKERJAAN PASANGAN
1 Pasang Pondasi Batu kali 1Pc : 8 Ps 57.42 M3 A.3.2.1.14 772,623.50
2 Pas. dinding bata merah ½ bata, camp 1 PC : 8 PP 252.00 M2 A.4.4.1.12 115,313.00
3 Plesteran 1 Pc: 8 Ps dinding 504.00 M2 A.4.4.2.32. 67,713.89
4 Pemasangan acian 698.22 M2 A.4.4.2.45. 42,223.50
5 Pasang list ban-banan 315.00 M1 Taksir 20,355.50
6 Pasang Krawangan 125.00 Bh Taksir 175,000.00
7 Pasang Granit Lantai 60 x 60 165.00 M2 A.4.4.3.13. 205,426.32
JUMLAH
VI PEKERJAAN ATAP dan PLAFOND
1 Gording Kayu Jati 3.60 M2 Taksir 13,000,000.00
2 Pasang Kerpus Sejenis 63.00 M1 Taksir 100,000.00
3 Pasangan genteng Kebumen 280.50 M2 Taksir 165,000.00
4 Pasang lisplank kalsiplank 90.40 M1 Taksir 30,000.00
5 Pasang rangka plafond hollow galvanis 233.92 M2 Taksir 80,000.00
6 Pasang Plafon PVC 233.92 M2 Taksir 125,000.00
7 Pasang List Plafond 128.00 M1 Taksir 12,500.00
8
JUMLAH
VII PEKERJAAN PINTU
1 Kusen 1.74 m3 17,168,112.23
2 Daun Pintu 16.50 m2 1,026,352.80
3 Daun Jendela 15.12 m2 1,302,325.20

JUMLAH
VIII PEKERJAAN LISTRIK

1 Pasang Instalasi Titik Lampu 12.00 Bh Taksir 135,000.00


2 Pasang Instalasi Stop Kontak 4.00 Bh Taksir 135,000.00
3 Pasang stop contact 4.00 Bh Taksir 30,000.00
4 Pasang lampu Downlight 12.00 Bh Taksir 40,000.00
5 Pasang Saklar Tunggal 2.00 Bh Taksir 35,000.00
6 Pasang saklar ganda 5.00 Bh Taksir 37,500.00
7 Pasang box MCB 1.00 Bh Taksir 145,000.00
JUMLAH
IX PEKERJAAN CAT-CATAN
1 Pengecatan tembok interior 504.00 M2 A.4.7.1.10 30,580.26
2 Pengecatan plafond interior 233.92 M2 A.4.7.1.10 30,580.26
3 Politur Kusen dan Pintu 107.76 m2 47,215.63
4 Pengecatan listpalnk 27.12 M2 4.7.1.4. 38,857.35
JUMLAH

TOTAL
LAAN TEMPAT IBADAH
JID AL HIKMAH
EPAT KEC. MASARAN

JUMLAH HARGA
Rp.
7

150,000.00
500,000.00

650,000.00

1,890,207.00
630,069.00
36,135,000.00
4,533,772.32
43,189,048.32

2,077,621.72
4,648,602.25
4,064,607.00
9,227,125.08
5,255,957.32
2,803,177.24
840,953.17
1,121,270.90
4,769,294.61
4,019,834.03
13,992,146.31
52,820,589.62

8,632,990.81
7,548,444.22
16,501,175.43
10,845,465.84
5,784,248.45
1,272,534.66
1,696,712.88
88,571,304.36
7,741,788.08
148,594,664.74

3,609,250.47
3,917,980.68
11,724,260.36
16,976,353.68
13,581,082.94
2,716,216.59
4,615,031.87
9,422,356.74
12,763,447.52
79,325,980.85

44,364,041.37
29,058,876.00
34,127,799.55
29,481,292.17
6,411,982.50
21,875,000.00
33,895,342.80
199,214,334.39

46,800,000.00
6,300,000.00
46,282,500.00
2,712,000.00
18,713,600.00
29,240,000.00
1,600,000.00
-
151,648,100.00

29,948,054.97
16,934,821.20
19,691,157.02

66,574,033.19

1,620,000.00
540,000.00
120,000.00
480,000.00
70,000.00
187,500.00
145,000.00
3,162,500.00

15,412,453.06
7,153,335.35
5,087,956.76
1,053,811.22
28,707,556.40

773,886,807.51
DAFTAR HARGA SATUAN PEKERJAAN

HARGA 2019
NO KODE URAIAN PEKERJAAN SATUAN OVERHEAD &
TENAGA BAHAN TOTAL
PROFIT
I AHSP HARGA SATUAN PEKERJAAN TANAH
1 A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m m3 78,250.00 - 7,825.00 86,075.00
2 A.2.3.1.2 Penggalian 1 m³ tanah biasa sedalam 2 m m3 95,850.00 - 9,585.00 105,435.00
3 A.2.3.1.3 Menggali 1 m³ tanah biasa sedalam 3 m m3 113,710.00 - 11,371.00 125,081.00
4 A.2.3.1.4 Menggali 1 m³ tanah keras sedalam 1 m m3 104,160.00 - 10,416.00 114,576.00
5 A.2.3.1.6 Menggali 1 m³ tanah lumpur sedalam 1 m m3 125,850.00 - 12,585.00 138,435.00
6 A.2.3.1.7 Pengerjaan stripping 1 m² tanah tebing setinggi 1 m m3 5,650.00 - 565.00 6,215.00
7 A.2.3.1.8 Pembuangan 1 m³ tanah sejauh 30 m m2 34,300.00 - 3,430.00 37,730.00
8 A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah m3 26,083.33 - 2,608.33 28,691.67
9 A.2.3.1.10 Pemadatan tanah 1 m³ tanah (per 20 cm) m3 56,500.00 - 5,650.00 62,150.00
10 A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug m3 31,300.00 153,360.00 18,466.00 203,126.00
11 A.2.3.1.12 Pemasangan 1 m³ lapisan pudel campuran 1 KP : 3 PP : 7 TL m3 143,400.00 164,387.50 30,778.75 338,566.25
12 A.2.3.1.13 Pemasangan 1 m² lapisan ijuk tebal 10 cm untuk bidang resapan m2 16,950.00 73,278.00 9,022.80 99,250.80
13 A.2.3.1.13.1 Memasang lapisan pudel 1 KP : 5 TL m2 78,380.00 118,618.40 19,699.84 216,698.24
14 A.2.3.1.14 Pengurugan 1 m³ sirtu padat (sirtu merapi) m3 28,250.00 195,480.00 22,373.00 246,103.00
15 A.2.3.1.15 Pengurugan 1 m³ sirtu m3 28,250.00 210,000.00 23,825.00 262,075.00
16 A.2.3.1.16 Pengurugan tanah urug m3 31,250.00 60,000.00 9,125.00 100,375.00
17 A.2.3.1.17 Pengurugan tanah kembali dipadatkan m3 76,690.00 - 7,669.00 84,359.00
###
II AHSP HARGA SATUAN PEKERJAAN PONDASI ###
1 A.3.2.1.1. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 3 PP m3 259,125.00 554,935.00 81,406.00 895,466.00
2 A.3.2.1.2. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 4 PP m3 259,125.00 515,740.00 77,486.50 852,351.50
3 A.3.2.1.3. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 5 PP m3 259,125.00 488,560.00 74,768.50 822,453.50
4 A.3.2.1.4. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 6 PP m3 259,125.00 469,455.00 72,858.00 801,438.00
5 A.3.2.1.5. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 8 PP m3 259,125.00 443,260.00 70,238.50 772,623.50
6 A.3.2.1.7. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 3 KP : 10 PP m3 259,125.00 468,704.70 72,782.97 800,612.67
7 A.3.2.1.9. Pemasangan 1 m³ batu kosong (aanstamping) m3 134,745.00 325,134.00 45,987.90 505,866.90
8 A.3.2.1.10. Pemasangan 1 m³ pondasi siklop, 60% beton camp 1PC:2PB:3KR m3 474,725.00 513,232.16 98,795.72 1,086,752.88
9 A.3.2.1.11. Pemasangan 1 m³ pondasi sumuran, diameter 100 cm m3 361,470.00 506,484.05 86,795.41 954,749.46
10 A.3.2.1.12. Pemasangan batu bronjong kawat 3mm m3 266,000.00 631,184.40 89,718.44 986,902.84
###
III AHSP HARGA SATUAN PEKERJAAN BETON ###
1 A.4.1.1.1 Membuat beton mutu f'c = 7,4 MPa (K 100) m3 212,290.00 590,748.70 80,303.87 883,342.57
2 A.4.1.1.2 Membuat beton mutu f'c = 9,8 MPa (K 125) m3 212,290.00 620,941.20 83,323.12 916,554.32
3 A.4.1.1.3 Membuat beton mutu f'c = 12,2 MPa (K 150) m3 212,290.00 644,579.30 85,686.93 942,556.23
4 A.A.4.1.1.4 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100) m3 154,300.00 577,510.70 73,181.07 804,991.77
5 A.A.4.1.1.5 Membuat beton mutu f'c = 14,5 MPa (K 175) m3 212,290.00 672,551.30 88,484.13 973,325.43
6 A.A.4.1.1.6 Membuat beton mutu f'c = 16,9 MPa (K 200) m3 212,290.00 699,262.30 91,155.23 1,002,707.53
7 A.4.1.1.7 Membuat beton mutu f'c = 19,3 MPa (K 225) m3 212,290.00 719,302.70 93,159.27 1,024,751.97
8 A.4.1.1.8 Membuat beton mutu f'c = 21,7 MPa (K 250) m3 212,290.00 732,511.50 94,480.15 1,039,281.65
9 A.4.1.1.9 Membuat beton mutu f'c = 24,0 MPa (K 275) m3 212,290.00 755,266.60 96,755.66 1,064,312.26
10 A.4.1.1.10 Membuat beton mutu f'c = 26,4 MPa (K 300) m3 212,290.00 762,305.30 97,459.53 1,072,054.83
11 A.4.1.1.11 Membuat beton mutu f'c = 28,8 MPa (K 325) m3 270,025.00 789,026.20 105,905.12 1,164,956.32
12 A.4.1.1.12 Membuat beton mutu f'c = 31,2 MPa (K 350) m3 270,025.00 798,269.20 106,829.42 1,175,123.62
13 A.4.1.1.17 Pembesian dengan besi polos atau besi ulir kg 1,679.50 10,492.74 1,217.22 13,389.46
14 7394.20 Pemasangan 1 m² bekisting untuk pondasi m2 89,830.00 26,029.35 11,585.94 127,445.29
15 7394.21 Pemasangan 1 m² bekisting untuk sloof dan ring balk m2 83,305.00 29,125.58 11,243.06 123,673.63
16 7394.23 Pemasangan 1 m² bekisting untuk kolom m2 114,015.00 100,332.90 21,434.79 235,782.69
17 7394.23 Pemasangan 1 m² bekisting untuk balok dan konsol m2 114,015.00 104,499.77 21,851.48 240,366.24
18 7394.24 Pemasangan 1 m² bekisting untuk plat lantai m2 114,015.00 107,049.20 22,106.42 243,170.62
19 7394.25 Pemasangan 1 m² bekisting untuk dinding m2 114,015.00 125,874.60 23,988.96 263,878.56
20 7394.26 Pemasangan 1 m² bekisting untuk tangga m2 114,015.00 81,437.25 19,545.23 214,997.48
21 A.4.1.1.27 Pemasangan 1 m² bekisting jembatan untuk pengecoran beton m2 22,665.00 83,466.97 10,613.20 116,745.17
22 A.4.1.1.28 Membuat pondasi beton bertulang (150 kg besi + bekisting) m3 912,200.00 2,795,313.90 370,751.39 4,078,265.29
23 A.4.1.1.29 Membuat sloof beton bertulang (200 kg besi + bekisting) m3 1,030,365.00 3,502,027.20 453,239.22 4,985,631.42
24 A.4.1.1.30 Membuat kolom beton bertulang (300 kg besi + bekisting) m3 1,284,265.00 5,310,627.60 659,489.26 7,254,381.86
25 A.4.1.1.31 Membuat balok beton bertulang (200 kg besi + bekisting) m3 1,116,965.00 4,105,552.80 522,251.78 5,744,769.58
26 A.4.1.1.32 Membuat kolom beton bertulang (150 kg besi + bekisting) m3 912,575.00 3,892,675.80 480,525.08 5,285,775.88
27 A.4.1.1.33 Membuat dinding beton bertulang (150 kg besi + bekisting) m3 912,200.00 3,433,397.40 434,559.74 4,780,157.14
28 A.4.1.1.34 Membuat dinding beton bertulang (200 kg besi + bekisting) m3 1,030,365.00 3,871,657.20 490,202.22 5,392,224.42
29 A.4.1.1.35 Membuat kolom praktis beton bertulang (11 x 11) cm m3 27,120.00 43,220.20 7,034.02 77,374.22
30 A.4.1.1.36 Membuat ring balok beton bertulang (10 x 15) cm m3 44,780.00 55,573.48 10,035.35 110,388.83
###
IV AHSP HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM ###
1 A.4.2.1.1 Pemasangan 1 kg besi profil kg 14,340.00 15,887.25 3,022.73 33,249.98
2 A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF kg 14,340.00 18,226.35 3,256.64 35,822.99
3 A.4.2.1.3 Pengerjaan 100 kg pekerjaan perakitan kg 12,383.50 25,099.00 3,748.25 41,230.75
4 A.4.2.1.4 Pembuatan Pintu besi plat baja tebal 2 mm rangkap, rk besi siku kg 250,885.00 729,132.75 98,001.78 1,078,019.53
5 A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik cm 6,910.00 16,271.64 2,913.16 32,044.80
6 A.4.2.1.7 Pemasangan pintu rolling door besi m2 279,780.00 499,950.00 77,973.00 857,703.00
7 A.4.2.1.8 Pemasangan pintu lipat (folding door) m2 105,160.00 568,080.00 67,324.00 740,564.00
8 A.4.2.1.10 Pemasangan rolling door aluminium m2 239,000.00 545,400.00 78,440.00 862,840.00
9 A.4.2.1.11 Pemasangan kusen pintu dan jendela aluminium 3" silver m' 10,270.50 80,567.28 9,083.78 99,921.56
10 A.4.2.1.11.1 Pemasangan kusen pintu dan jendela aluminium 4" silver m' 10,270.50 90,467.28 10,073.78 110,811.56
11 A.4.2.1.11.2 Pemasangan kusen pintu dan jendela aluminium 3" brown m' 10,270.50 82,616.58 9,288.71 102,175.79
12 A.4.2.1.11.3 Memasang kusen pintu dan jendela aluminium 4" brown m' 10,270.50 91,011.78 10,128.23 111,410.51
13 A.4.2.1.12 Pemasangan pintu aluminium strip lebar 8 cm m2 20,308.50 602,020.80 62,232.93 684,562.23
14 A.4.2.1.13 Pemasangan daun pintu & jendela kaca bening rangka aluminium m2 20,308.50 364,158.36 38,446.69 422,913.55
15 A.4.2.1.14 Pemasangan venetions blinds dan vertical blinds m2 83,715.00 68,571.00 15,228.60 167,514.60
16 A.4.2.1.15 Pemasangan terali besi strip m2 399,065.00 185,010.16 58,407.52 642,482.68
17 A.4.2.1.18 Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm m' 69,130.00 189,278.51 25,840.85 284,249.36
18 A.4.2.1.19 Pemasangan talang ½ lingkaran D-15cm, seng plat bjls 30 lb 45 cm m' 55,790.00 41,448.87 9,723.89 106,962.76
19 A.4.2.1.20 Pemasangan rangka besi hollow 1x40.40.2mm dinding partisi m2 59,815.00 75,333.88 13,514.89 148,663.76
20 A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon m2 83,715.00 78,953.00 16,266.80 178,934.80
21 Dihitung Pemasangan pintu PVC polos bh 244,801.00 270,000.00 51,480.10 566,281.10
22 Dihitung Pemasangan pintu PVC motif bh 244,801.00 343,818.00 58,861.90 647,480.90
###
V AHSP HARGA SATUAN PEKERJAAN PASANGAN DINDING ###
1 A.4.4.1.2 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 3 PP m2 90,400.00 141,046.00 23,144.60 254,590.60
HARGA 2019
NO KODE URAIAN PEKERJAAN SATUAN OVERHEAD &
TENAGA BAHAN TOTAL
PROFIT
2 A.4.4.1.3 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 4 PP m2 90,400.00 133,884.00 22,428.40 246,712.40
3 A.4.4.1.4 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 5 PP m2 90,400.00 130,506.00 22,090.60 242,996.60
4 A.4.4.1.5 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 6 PP m2 90,400.00 130,040.00 22,044.00 242,484.00
5 A.4.4.1.6 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 3 KP : 10 PP m2 90,400.00 119,796.90 21,019.69 231,216.59
6 A.4.4.1.7 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 2 PP m2 45,200.00 71,981.00 11,718.10 128,899.10
7 A.4.4.1.8 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 3 PP m2 45,200.00 66,966.60 11,216.66 123,383.26
8 A.4.4.1.9 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 4 PP m2 45,200.00 64,165.00 10,936.50 120,301.50
9 A.4.4.1.10 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 5 PP m2 45,200.00 62,407.40 10,760.74 118,368.14
10 A.4.4.1.11 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 6 PP m2 45,200.00 61,582.60 10,678.26 117,460.86
11 A.4.4.1.12 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 8 PP m2 45,200.00 59,630.00 10,483.00 115,313.00
12 A.4.4.1.13 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 3 KP : 10 PP m2 45,200.00 60,240.00 10,544.00 115,984.00
13 A.4.4.1.14 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 1 KP : 1 PP m2 45,200.00 49,709.41 9,490.94 104,400.35
14 A.4.4.1.15 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 1 KP : 2 PP m2 45,200.00 50,772.88 9,597.29 105,570.16
15 A.4.4.1.22 Pemasangan dinding terawang (roster) 12 x 11 x 24 cm, camp 1 PC : 3 PP m2 45,200.00 228,275.00 27,347.50 300,822.50
16 A.4.4.1.23 Pemasangan dinding terawang (roster) 12 x 11 x 24 cm, campuran 1 PC : 4 PP m2 45,200.00 224,735.00 26,993.50 296,928.50

VI AHSP HARGA SATUAN PEKERJAAN PLESTERAN


1 A.4.4.2.1 Pemasangan plesteran 1 PC : 1 PP, tebal 15 mm m2 51,825.00 21,414.72 7,323.97 80,563.69
2 A.4.4.2.2 Pemasangan plesteran 1 PC : 2 PP, tebal 15 mm m2 51,825.00 15,964.32 6,778.93 74,568.25
3 A.4.4.2.3 Pemasangan plesteran 1 PC : 3 PP, tebal 15 mm m2 51,825.00 13,660.68 6,548.57 72,034.25
4 A.4.4.2.4 Pemasangan plesteran 1 PC : 4 PP, tebal 15 mm m2 51,825.00 12,043.20 6,386.82 70,255.02
5 A.4.4.2.6 Pemasangan plesteran 1 PC : 6 PP, tebal 15 mm m2 51,825.00 10,475.88 6,230.09 68,530.97
6 A.4.4.2.8 Pemasangan plesteran 1 PC : 8 PP, tebal 15 mm m2 51,825.00 9,733.08 6,155.81 67,713.89
7 A.4.4.2.9 Pemasangan plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm m2 54,240.00 9,961.60 6,420.16 70,621.76
8 A.4.4.2.10 Pemasangan plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm m2 54,240.00 8,489.67 6,272.97 69,002.64
9 A.4.4.2.11 Pemasangan plesteran 1 PC : 1 KP : 1 PP, tebal 15 mm m2 54,240.00 3,655.03 5,789.50 63,684.53
10 A.4.4.2.12 Pemasangan plesteran 1 PC : 1 KP : 2 PP, tebal 15 mm m2 54,240.00 4,402.80 5,864.28 64,507.08
11 A.4.4.2.13 Pemasangan plesteran 1 PC : 1 PP, tebal 20 mm m2 69,360.00 21,350.76 9,071.08 99,781.84
12 A.4.4.2.14 Pemasangan plesteran 1 PC : 3 PP, tebal 20 mm m2 69,360.00 18,279.24 8,763.92 96,403.16
13 A.4.4.2.15 Pemasangan plesteran 1 PC : 4 PP, tebal 20 mm m2 69,360.00 16,057.60 8,541.76 93,959.36
14 A.4.4.2.16 Pemasangan plesteran 1 PC : 5 PP, tebal 20 mm m2 69,360.00 14,981.16 8,434.12 92,775.28
15 A.4.4.2.17 Pemasangan plesteran 1 PC : 6 PP, tebal 20 mm m2 69,360.00 13,967.84 8,332.78 91,660.62
16 A.4.4.2.18 Pemasangan plesteran 1 PC : 1 KP : 2 PP, tebal 20 mm m2 76,010.00 5,302.62 8,131.26 89,443.88
17 A.4.4.2.19 Pemasangan berapen 1 PC : 1 PP, tebal 15 mm m2 26,040.00 11,187.12 3,722.71 40,949.83
18 Dihitung Pemasangan plesteran skoning 1 PC : 3 PP, lebar 10 mm m' 15,380.00 3,125.00 1,850.50 20,355.50
19 A.4.4.2.23 Pemasangan plesteran ciprat 1 PC : 2 PP m2 45,200.00 6,267.60 5,146.76 56,614.36
20 A.4.4.2.24 Pemasangan Finishing siar pasangan bata merah m2 26,040.00 3,667.44 2,970.74 32,678.18
21 A.4.4.2.25 Pemasangan Finishing siar pasangan conblock ekspose m2 12,220.00 1,888.00 1,410.80 15,518.80
22 A.4.4.2.26 Pemasangan Finishing siar pasangan batu kali camp 1 PC : 2 PP m2 51,825.00 9,821.20 6,164.62 67,810.82
23 A.4.4.2.27 Pemasangan acian m2 34,550.00 3,835.00 3,838.50 42,223.50
###
VII AHSP HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING ###
1 A.4.4.3.9 Pemasangan lantai ubin granit ukuran (40 x 40) cm m2 43,315.00 140,627.87 18,394.29 202,337.16
2 A.4.4.3.10 Pemasangan lantai ubin granit ukuran (30 x 30) cm m2 44,915.00 120,063.61 16,497.86 181,476.47
3 A.4.4.3.13.1 Pemasangan lantai keramik ukuran (60 x 60) cm kelas I m2 41,460.00 150,062.10 19,152.21 210,674.31
4 A.4.4.3.13.2 Pemasangan lantai keramik ukuran (60 x 60) cm kelas II m2 41,460.00 145,291.20 18,675.12 205,426.32
5 A.4.4.3.35 Pemasangan lantai keramik ukuran (30 x 30) cm kelas I m2 120,925.00 106,496.20 22,742.12 250,163.32
6 A.4.4.3.35.1 Pemasangan lantai keramik ukuran (30 x 30) cm kelas II m2 120,925.00 91,540.00 21,246.50 233,711.50
7 A.4.4.3.36 Pemasangan lantai keramik ukuran (20 x 20) cm kelas I m2 120,925.00 95,094.50 21,601.95 237,621.45
8 A.4.4.3.36.1 Pemasangan lantai keramik ukuran (20 x 20) cm kelas II m2 120,925.00 95,094.50 21,601.95 237,621.45
9 A.4.4.3.39 Pemasangan plint keramik ukuran (10 x 20) cm m' 24,825.00 13,766.10 3,859.11 42,450.21
10 A.4.4.3.46 Pemasangan lantai parquet kayu m2 120,925.00 99,528.75 22,045.38 242,499.13
11 A.4.4.3.47 Pemasangan lantai kayu (gymfloor) m2 120,925.00 120,375.45 24,130.05 265,430.50
12 A.4.4.3.51 Pemasangan dinding keramik artistik ukuran (10 x 20) cm klas I m2 155,475.00 552,279.00 70,775.40 778,529.40
13 A.4.4.3.51.1 Pemasangan dinding keramik artistik ukuran (10 x 20) cm klas II m2 155,475.00 349,554.00 50,502.90 555,531.90
14 A.4.4.3.52 Pemasangan dinding keramik artistik ukuran (7 x 20) cm Klas I m2 155,475.00 755,328.00 91,080.30 1,001,883.30
15 A.4.4.3.52.1 Pemasangan dinding keramik artistik ukuran (7 x 20) cm Klas II m2 155,475.00 755,328.00 91,080.30 1,001,883.30
16 A.4.4.3.53 Pemasangan dinding keramik ukuran (10 x 20) cm kelas I m2 155,475.00 118,686.00 27,416.10 301,577.10
17 A.4.4.3.53.1 Pemasangan dinding keramik ukuran (10 x 20) cm kelas II m2 155,475.00 104,376.00 25,985.10 285,836.10
18 A.4.4.3.54 Pemasangan dinding keramik ukuran (20 x 20) cm kelas I m2 155,475.00 110,401.50 26,587.65 292,464.15
19 A.4.4.3.54.1 Pemasangan dinding keramik ukuran (20 x 20) cm kelas II m2 155,475.00 92,275.50 24,775.05 272,525.55
20 A.4.4.3.55 Pemasangan dinding marmer ukuran (100 x 100) cm Klas I m2 224,575.00 233,649.17 45,822.42 504,046.59
21 A.4.4.3.55.1 Pemasangan dinding marmer ukuran (100 x 100) cm Klas II m2 224,575.00 192,569.93 41,714.49 458,859.42
22 A.4.4.3.56 Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm m' 94,325.00 1,914,142.90 200,846.79 2,209,314.69
23 A.4.4.3.57 Pemasangan dinding batu paras m2 120,925.00 135,629.00 25,655.40 282,209.40
24 A.4.4.3.58 Pemasangan dinding batu tempel hitam m2 120,925.00 137,876.30 25,880.13 284,681.43
25 A.4.4.3.59 Pemasangan lantai vynil ukuran 30 x 30 cm m2 35,915.00 119,854.80 15,576.98 171,346.78
26 A.4.4.3.60 Pemasangan wallpaper lebar 50 cm m2 58,385.00 146,621.25 20,500.63 225,506.88
27 A.4.4.3.61 Pemasangan floor harderner m2 28,680.00 9,990.00 3,867.00 42,537.00
28 A.4.4.3.62.1 Pemasangan plint vynil 30x30 m' 19,120.00 7,065.36 2,618.54 28,803.90
29 A.4.4.3.9.1 Pemasangan lantai keramik ukuran (40 x 40) cm kelas I m2 120,925.00 108,622.07 22,954.71 252,501.78
30 A.4.4.3.9.2 Pemasangan lantai keramik ukuran (40 x 40) cm kelas II m2 120,925.00 96,031.70 21,695.67 238,652.37
31 Dihitung Pemasangan dinding keramik ukuran (20 x 25) cm kelas I m2 155,475.00 99,930.00 25,540.50 280,945.50
32 Dihitung Pemasangan dinding keramik ukuran (20 x 25) cm kelas II m2 155,475.00 90,480.00 24,595.50 270,550.50
33 Dihitung Pemasangan lantai andesit ukuran (40 x 40) cm m2 120,925.00 229,076.71 35,000.17 385,001.88
34 Dihitung Pemasangan lantai andesit ukuran (30 x 30) cm m2 120,925.00 201,344.15 32,226.91 354,496.06
35 Dihitung Pemasangan lantai andesit ukuran (20 x 20) cm m2 120,925.00 195,006.92 31,593.19 347,525.11
36 Dihitung Pemasangan lantai sandstone ukuran (40 x 40) cm m2 120,925.00 156,250.66 27,717.57 304,893.23
37 Dihitung Pemasangan lantai sandstone ukuran (20 x 20) cm m2 120,925.00 145,990.40 26,691.54 293,606.94
38 Dihitung Pemasangan lantai salagedang ukuran (30 x 30) cm m2 120,925.00 174,076.86 29,500.19 324,502.04
39 Dihitung Pemasangan lantai salagedang ukuran (20 x 20) cm m2 120,925.00 149,453.42 27,037.84 297,416.26
40 Dihitung Pemasangan lantai salagedang acak m2 120,925.00 134,625.20 25,555.02 281,105.22
41 Dihitung Pemasangan dinding salagedang acak m2 155,475.00 141,283.20 29,675.82 326,434.02
42 Dihitung Pemasangan lantai batu tempel purwakarta ukuran (20 x 20) cm m2 120,925.00 160,395.80 28,132.08 309,452.88
43 Dihitung Pemasangan lantai batu tempel purwakarta acak m2 120,925.00 138,466.40 25,939.14 285,330.54
44 Dihitung Pemasangan dinding batu tempel purwakarta acak m2 155,475.00 145,124.40 30,059.94 330,659.34
45 Dihitung Pemasangan lantai batu palimanan ukuran (30 x 30) cm m2 120,925.00 164,366.01 28,529.10 313,820.11
46 Dihitung Pemasangan lantai batu palimanan ukuran (20 x 20) cm m2 120,925.00 155,625.80 27,655.08 304,205.88
47 Dihitung Pemasangan dinding batu palimanan ukuran (10 x 20) cm m2 155,475.00 152,648.40 30,812.34 338,935.74
48 Dihitung Pemasangan lantai batu candi ukuran (30 x 30) cm m2 120,925.00 148,126.78 26,905.18 295,956.96
49 Dihitung Pemasangan lantai batu candi ukuran (20 x 20) cm m2 120,925.00 155,625.80 27,655.08 304,205.88
50 Dihitung Pemasangan dinding batu candi ukuran (10 x 20) cm m2 155,475.00 127,596.36 28,307.14 311,378.50
51 Dihitung Pemasangan paving I, tebal 6 cm, K175 m2 94,500.00 78,257.76 17,275.78 190,033.54
52 Dihitung Pemasangan paving I, tebal 8 cm, K225 m2 94,500.00 97,792.17 19,229.22 211,521.39
53 Dihitung Pemasangan paving I, tebal 8 cm, K250 m2 94,500.00 103,000.74 19,750.07 217,250.81
HARGA 2019
NO KODE URAIAN PEKERJAAN SATUAN OVERHEAD &
TENAGA BAHAN TOTAL
PROFIT
54 Dihitung Pemasangan paving I, tebal 8 cm, K300 m2 94,500.00 108,509.28 20,300.93 223,310.21
55 Dihitung Pemasangan paving segienam, tebal 5 cm, K175 m2 94,500.00 73,185.54 16,768.55 184,454.09
56 Dihitung Pemasangan paving segienam warna, tebal 5 cm, K175 m2 94,500.00 78,694.08 17,319.41 190,513.49
57 Dihitung Pemasangan paving segienam warna, tebal 7 cm, K200 m2 94,500.00 82,730.04 17,723.00 194,953.04
###
VIII AHSP SATUAN PEKERJAAN LANGIT-LANGIT (PLAPON) ###
1 A.4.5.1.2 Pemasangan langit-langit akustik ukuran (30 x 30) cm m2 28,680.00 211,834.35 24,051.44 264,565.79
2 A.4.5.1.3 Pemasangan langit-langit akustik ukuran (30 x 60) cm m2 28,680.00 315,303.75 34,398.37 378,382.12
3 A.4.5.1.4 Pemasangan langit-langit akustik ukuran (60 x 120) cm m2 23,900.00 225,833.85 24,973.39 274,707.24
4 A.4.5.1.5 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 3 mm m2 23,900.00 19,505.61 4,340.56 47,746.17
5 A.4.5.1.5.1 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 4 mm m2 23,900.00 21,874.86 4,577.49 50,352.35
6 A.4.5.1.5.2 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 6 mm m2 23,900.00 28,530.36 5,243.04 57,673.40
7 A.4.5.1.6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm m2 191,200.00 37,293.57 22,849.36 251,342.93
8 A.4.5.1.7 Pemasangan langit-langit gypsum board uk (120x240), tbl 9 mm m2 17,275.00 27,412.09 4,468.71 49,155.80
9 Dihitung Pemasangan langit-langit calsiboard m2 17,275.00 54,521.37 7,179.64 78,976.01
10 Dihitung Pemasangan langit-langit harplek m2 17,275.00 24,668.82 4,194.38 46,138.20
11 A.4.5.1.8 Pemasangan langit-langit akustik uk (60 x 120) cm + rangka aluminium m2 119,500.00 337,824.00 45,732.40 503,056.40
12 A.4.5.1.9 Pemasangan list langit-langit kayu profil m' 12,015.00 11,592.27 2,360.73 25,968.00
13 Dihitung Pemasangan list plafond gypsum profil m' 14,340.00 8,209.35 2,254.94 24,804.29
###
IX AHSP HARGA SATUAN PEKERJAAN PENUTUP ATAP ###
1 Dihitung Pemasangan genteng kodok kebumen m2 26,040.00 70,875.00 9,691.50 106,606.50
2 Dihitung Pemasangan genteng magas kebumen m2 26,040.00 69,975.00 9,601.50 105,616.50
3 Dihitung Pemasangan genteng mantili mojolaban m2 26,040.00 92,700.00 11,874.00 130,614.00
4 Dihitung Pemasangan genteng morando kebumen m2 26,040.00 39,204.00 6,524.40 71,768.40
5 Dihitung Pemasangan genteng pelentong kebumen m2 26,040.00 38,025.00 6,406.50 70,471.50
6 A.4.5.2.30 Pemasangan genteng beton m2 34,550.00 68,330.61 10,288.06 113,168.67
7 A.4.5.2.32 Pemasangan genteng metal kelas I m2 33,380.00 219,129.30 25,250.93 277,760.23
8 A.4.5.2.32.1 Pemasangan genteng metal kelas II m2 33,380.00 120,554.46 15,393.45 169,327.91
9 A.4.5.2.34 Pemasangan nok genteng beton m' 36,416.00 84,426.52 12,084.25 132,926.77
10 Dihitung Pemasangan bubungan pada atap genteng kebumen m' 66,760.00 62,949.00 12,970.90 142,679.90
11 Dihitung Pemasangan bubungan pada atap genteng mojolaban m' 66,760.00 49,494.00 11,625.40 127,879.40
12 A.4.5.2.34 Pemasangan bubungan pada atap genteng beton m' 66,760.00 80,769.00 14,752.90 162,281.90
13 A.4.5.2.36 Pemasangan bubungan pada atap genteng metal kelas I m' 24,065.00 130,593.24 15,465.82 170,124.06
14 A.4.5.2.36.1 Pemasangan bubungan pada atap genteng metal kelas II m' 24,065.00 75,310.74 9,937.57 109,313.31
15 A.4.5.2.38 Pemasangan atap seng gelombang (0,8 x 1,80) m2 20,730.00 46,393.74 6,712.37 73,836.11
16 A.4.5.2.38.1 Pemasangan atap seng gelombang (0,8 x 2,10) m2 20,730.00 54,331.74 7,506.17 82,567.91
17 A.4.5.2.39 Pemasangan nok atap seng m' 25,055.00 12,435.48 3,749.05 41,239.53
18 A.4.5.2.40 Pemasangan atap alumunium m2 115,780.00 203,377.14 31,915.71 351,072.85
19 A.4.5.2.42 Pemasangan Alumunium Foil / sisalation m2 22,665.00 42,525.00 6,519.00 71,709.00
###
X AHSP HARGA SATUAN PEKERJAAN KAYU ###
1 A.4.6.1.1 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas I m3 3,528,000.00 35,035,674.75 3,856,367.48 42,420,042.23
2 A.4.6.1.2 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas II m3 3,024,000.00 12,583,374.75 1,560,737.48 17,168,112.23
3 A.4.6.1.2.1 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas III m3 3,024,000.00 10,038,052.35 1,306,205.24 14,368,257.58
4 A.4.6.1.5 Pembuatan dan Pemasangan daun pintu panel, kayu kelas I m2 504,000.00 1,283,508.00 178,750.80 1,966,258.80
5 A.4.6.1.5.1 Pembuatan dan Pemasangan daun pintu panel, kayu kelas II m2 504,000.00 429,048.00 93,304.80 1,026,352.80
6 A.4.6.1.6 Pembuatan dan Pemasangan pintu & jendela kaca, kayu klas I (tanpa kaca) m2 403,200.00 770,104.80 117,330.48 1,290,635.28
7 A.4.6.1.6.1 Pembuatan dan Pemasangan pintu & jendela kaca, kayu klas II (tanpa kaca) m2 403,200.00 257,428.80 66,062.88 726,691.68
8 A.4.6.1.7 Pembuatan dan Pemasangan pintu & jendela jalusi, kayu kelas I m2 504,000.00 2,047,068.00 255,106.80 2,806,174.80
9 A.4.6.1.7.1 Pembuatan dan Pemasangan pintu & jendela jalusi, kayu kelas II m2 504,000.00 679,932.00 118,393.20 1,302,325.20
10 A.4.6.1.10 Pemasangan jalusi kusen kayu kelas I m2 375,550.00 1,910,983.05 228,653.31 2,515,186.36
11 A.4.6.1.10.1 Pemasangan jalusi kusen kayu kelas II m3 375,550.00 629,293.05 100,484.31 1,105,327.36
12 A.4.6.1.13 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I m3 2,016,000.00 11,815,162.20 1,383,116.22 15,214,278.42
13 A.4.6.1.13.1 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas II m3 2,016,000.00 8,115,532.20 1,013,153.22 11,144,685.42
14 A.4.6.1.13.2 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas III m3 2,016,000.00 8,115,532.20 1,013,153.22 11,144,685.42
15 A.4.6.1.14 Pemasangan konstruksi kuda-kuda expose, kayu kelas I m3 3,376,800.00 38,494,312.20 4,187,111.22 46,058,223.42
16 A.4.6.1.15 Pemasangan konstruksi gording, kayu kelas I m2 1,209,600.00 11,779,056.00 1,298,865.60 14,287,521.60
17 A.4.6.1.15.1 Pemasangan konstruksi gording, kayu kelas II m2 1,209,600.00 8,079,426.00 928,902.60 10,217,928.60
18 A.4.6.1.16 Pemasangan rangka atap genteng, kaso & reng kayu kelas I m2 23,900.00 288,897.75 31,279.78 344,077.53
19 A.4.6.1.16.1 Pemasangan rangka atap genteng, kaso & reng kayu kelas II m2 23,900.00 296,533.35 32,043.34 352,476.69
20 A.4.6.1.16.2 Pemasangan rangka atap genteng, kaso & reng kayu kelas III m3 23,900.00 361,981.35 38,588.14 424,469.49
21 A.4.6.1.17 Pemasangan rangka atap genteng beton, kaso & reng kayu klas I m2 23,900.00 403,431.75 42,733.18 470,064.93
22 A.4.6.1.17.1 Pemasangan rangka atap genteng beton, kaso & reng kayu klas II m3 23,900.00 411,067.35 43,496.74 478,464.08
23 A.4.6.1.17.2 Pemasangan rangka atap genteng beton, kaso & reng kayu klas III m3 23,900.00 514,693.35 53,859.34 592,452.68
24 A.4.6.1.19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II m2 64,500.00 109,166.76 17,366.68 191,033.44
25 A.4.6.1.19.1 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas III m2 64,500.00 109,166.76 17,366.68 191,033.44
26 A.4.6.1.20 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II m2 61,050.00 116,078.67 17,712.87 194,841.54
27 A.4.6.1.20.1 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas III m2 61,050.00 116,078.67 17,712.87 194,841.54
28 A.4.6.1.21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I m' 37,150.00 344,990.70 38,214.07 420,354.77
29 A.4.6.1.21.1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas II m' 37,150.00 77,962.86 11,511.29 126,624.15
30 A.4.6.1.22 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I m' 37,150.00 350,659.35 38,780.94 426,590.29
31 A.4.6.1.22.1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas II m' 37,150.00 78,686.55 11,583.66 127,420.21
32 A.4.6.1.23 Pemasangan rangka dinding pemisah (60 x 120) cm ky kelas II m2 75,665.00 200,608.65 27,627.37 303,901.02
33 A.4.6.1.23.1 Pemasangan rangka dinding pemisah (60 x 120) cm ky kelas III m2 75,665.00 195,518.25 27,118.33 298,301.58
34 A.4.6.1.24 Pemasangan dinding pemisah teakwood rangkap, rangka ky kelas II m2 75,665.00 343,840.59 41,950.56 461,456.15
35 A.4.6.1.25 Pemasangan dinding pemisah plywood rangkap, rangka ky kelas II m2 100,800.00 262,036.53 36,283.65 399,120.18
36 A.4.6.1.26 Pemasangan dinding lambrisering dari papan kayu kelas I m2 302,400.00 229,099.50 53,149.95 584,649.45
37 A.4.6.1.27 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm m2 12,630.00 61,631.55 7,426.16 81,687.71
###
XI AHSP HARGA SATUAN PEKERJAAN KUNCI DAN KACA ###
1 A.4.6.2.2 Pemasangan kunci tanam kelas I bh 59,815.00 181,800.00 24,161.50 265,776.50
2 A.4.6.2.2.1 Pemasangan kunci tanam kelas II bh 59,815.00 118,170.00 17,798.50 195,783.50
3 A.4.6.2.4 Pemasangan kunci silinder bh 67,140.00 90,000.00 15,714.00 172,854.00
4 A.4.6.2.5 Pemasangan engsel pintu bh 21,479.00 16,506.00 3,798.50 41,783.50
5 A.4.6.2.6 Pemasangan engsel jendela bh 21,479.00 12,510.00 3,398.90 37,387.90
6 A.4.6.2.7 Pemasangan engsel angin bh 36,565.00 15,993.00 5,255.80 57,813.80
7 A.4.6.2.8 Pemasangan spring knife bh 22,415.00 19,701.00 4,211.60 46,327.60
8 A.4.6.2.9 Pemasangan kait angin bh 22,415.00 11,358.00 3,377.30 37,150.30
9 A.4.6.2.10 Pemasangan door closer bh 71,640.00 249,930.00 32,157.00 353,727.00
10 A.4.6.2.12 Pemasangan door holder bh 71,640.00 22,905.00 9,454.50 103,999.50
11 A.4.6.2.13 Pemasangan door stops bh 14,900.00 34,722.00 4,962.20 54,584.20
12 A.4.6.2.14 Pemasangan rel pintu sorong / geser bh 142,590.00 148,140.00 29,073.00 319,803.00
13 A.4.6.2.15.1 Pemasangan grendel ukuran besar bh 13,250.00 36,360.00 4,961.00 54,571.00
14 A.4.6.2.15.2 Pemasangan grendel ukuran kecil bh 13,250.00 10,251.00 2,350.10 25,851.10
HARGA 2019
NO KODE URAIAN PEKERJAAN SATUAN OVERHEAD &
TENAGA BAHAN TOTAL
PROFIT
15 A.4.6.2.16. Pemasangan kaca tebal 3 mm m2 21,479.00 67,268.70 8,874.77 97,622.47
16 A.4.6.2.16.1 Pemasangan kaca tebal 3 mm dg kisi kisi m2 59,815.00 73,035.00 13,285.00 146,135.00
17 A.4.6.2.17 Pemasangan kaca tebal 5 mm m2 21,479.00 84,781.80 10,626.08 116,886.88
18 A.4.6.2.18 Pemasangan kaca tebal 8 mm m2 24,342.00 161,834.76 18,617.68 204,794.44
19 A.4.6.2.20 Pemasangan kaca cermin tebal 5 mm m2 22,415.00 153,420.30 17,583.53 193,418.83
20 A.4.6.2.24 Pemasangan kaca rayban tebal 5 mm m2 21,479.00 105,908.40 12,738.74 140,126.14
21 A.4.6.2.25 Pemasangan kaca rayband tebal 8 mm m2 24,342.00 196,791.66 22,113.37 243,247.03
22 A.4.6.2.26 Pemasangan kaca jeruk tebal 3 mm m2 21,479.00 93,830.40 11,530.94 126,840.34
23 A.4.6.2.27 Pemasangan kaca jeruk tebal 5 mm m2 24,342.00 190,713.06 21,505.51 236,560.57
24 A.4.6.2.28 Pemasangan kaca es tebal 3 mm m2 21,479.00 88,781.40 11,026.04 121,286.44
25 A.4.6.2.29 Pemasangan kaca es tebal 5 mm m2 24,342.00 125,363.16 14,970.52 164,675.68
26 A.4.6.2.30 Pemasangan kaca tempered 12 mm m2 24,342.00 1,655,210.16 167,955.22 1,847,507.38

XII AHSP HARGA SATUAN PEKERJAAN PENGECATAN ###


1 A.4.7.1.1 Pengikisan / Pengerokan permukaan cat lama m2 15,390.00 1,657.80 1,704.78 18,752.58
2 A.4.7.1.2 Pencucian bidang permukaan tembok yang pernah dicat m2 15,390.00 794.25 1,618.43 17,802.68
3 A.4.7.1.3 Pengerokan karat pada permukaan baja cara manual m2 16,040.00 794.25 1,683.43 18,517.68
4 A.4.7.1.4 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) m2 9,220.00 26,104.86 3,532.49 38,857.35
5 A.4.7.1.5 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup ) m2 20,490.00 30,803.67 5,129.37 56,423.04
6 A.4.7.1.6 Pelaburan bidang kayu dengan teak oil m2 19,825.00 3,139.56 2,296.46 25,261.02
7 A.4.7.1.7 Pelaburan bidang kayu dengan pelitur m2 13,590.00 29,333.30 4,292.33 47,215.63
8 A.4.7.1.8 Pelaburan bidang kayu dengan cat residu dan teer m2 10,780.00 14,225.40 2,500.54 27,505.94
9 A.4.7.1.9 Pelaburan bidang kayu dengan vernis m2 37,590.00 8,991.90 4,658.19 51,240.09
10 A.4.7.1.9.1 Melapis meni pada permukaan kayu m2 8,020.00 8,472.60 1,649.26 18,141.86
11 A.4.7.1.9.2 Mendempul/memplamir dan menggosok kayu m2 14,575.00 13,545.72 2,812.07 30,932.79
12 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat
A.4.7.1.10 m2 10,737.50 17,062.74 2,780.02 30,580.26
interior kelas I
13 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat
A.4.7.1.10.1 m2 10,737.50 9,380.70 2,011.82 22,130.02
interior kelas II

14 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat
A.4.7.1.10.2 m2 10,737.50 40,300.02 5,103.75 56,141.27
eksterior
15 A.4.7.1.10.5 Pengecatan bidang tembok eksterior 2 lapis dengan roll m2 4,486.50 42,600.80 4,708.73 51,796.03
16 A.4.7.1.11 Pengecatan bidang tembok lama 2 lapis m2 8,755.00 19,550.16 2,830.52 31,135.68
17 A.4.7.1.15 Pemasangan Wallpaper m2 28,825.00 81,664.20 11,048.92 121,538.12
18 A.4.7.1.16 Pengecatan permukaan baja dengan meny besi m2 28,825.00 3,261.87 3,208.69 35,295.56
19 dihitung Pengecatan genting m2 61,050.00 26,573.51 8,762.35 96,385.86
20 dihitung Lapis plamir tembok m3 6,105.00 1,199.70 730.47 8,035.17

XIII AHSP HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG ###


1 A.5.1.1.1 Pemasangan kloset duduk/monoblok kelas I bh 484,050.00 2,494,296.00 297,834.60 3,276,180.60
2 A.5.1.1.1.1 Pemasangan kloset duduk/monoblok kelas II bh 484,050.00 1,527,120.00 201,117.00 2,212,287.00
3 A.5.1.1.2 Memasang kloset jongkok porselen kelas I bh 319,550.00 236,280.00 55,583.00 611,413.00
4 A.5.1.1.2.1 Memasang kloset jongkok porselen kelas II bh 319,550.00 134,175.00 45,372.50 499,097.50
5 A.5.1.1.4 Pemasangan urinoir bh 239,000.00 1,190,730.00 142,973.00 1,572,703.00
6 A.5.1.1.5 Pemasangan wastafel bh 320,550.00 548,976.00 86,952.60 956,478.60
7 A.5.1.1.7 Pemasangan bak mandi fibreglass vol 0,3 m3 bh 963,250.00 356,328.00 131,957.80 1,451,535.80
8 A.5.1.1.8 Pemasangan bak mandi batu bata volume 0,3 m3 q bh 1,001,400.00 244,620.00 160,677.00 1,767,447.00
9 A.5.1.1.10 Pemasangan bak air fiberglass vol 1 m3 bh 1,069,500.00 3,437,838.00 450,733.80 4,958,071.80
10 A.5.1.1.12 Pemasangan bak cuci piring stainlessteel 1 bak bh 44,700.00 222,660.00 26,736.00 294,096.00
11 A.5.1.1.12.1 Pemasangan bak cuci piring stainlessteel 2 bak bh 44,700.00 395,370.00 44,007.00 484,077.00
12 A.5.1.1.14 Pemasangan floor drain plastik bh 14,900.00 15,849.00 3,074.90 33,823.90
13 A.5.1.1.14.1 Pemasangan floor drain stainles bh 14,900.00 41,445.00 5,634.50 61,979.50
14 A.5.1.1.15 Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm bh 312,830.00 135,453.20 44,828.32 493,111.52
15 A.5.1.1.16 Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm bh 461,455.00 208,971.20 67,042.62 737,468.82
16 A.5.1.1.17 Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm bh 461,455.00 326,947.35 78,840.24 867,242.59
17 A.5.1.1.18 Pemasangan pipa galvanis diameter 1/2" m 20,835.00 40,008.60 6,084.36 66,927.96
18 A.5.1.1.19 Pemasangan kran air diameter 1/2" bh 11,450.00 18,303.75 2,975.38 32,729.13
19 A.5.1.1.19.1 Pemasangan kran air diameter 3/4" bh 11,450.00 27,393.75 3,884.38 42,728.13
20 A.5.1.1.20 Pemasangan pipa galvanis diameter 3/4" m 20,835.00 50,150.25 7,098.53 78,083.78
21 A.5.1.1.21 Pemasangan pipa galvanis diameter 1" m 20,835.00 70,893.90 9,172.89 100,901.79
22 A.5.1.1.22 Pemasangan pipa galvanis diameter 1¼" m 20,835.00 88,582.50 10,941.75 120,359.25
23 A.5.1.1.22.1 Pemasangan pipa galvanis diameter 1½" m 20,835.00 120,597.75 14,143.28 155,576.03
24 A.5.1.1.22.2 Pemasangan pipa galvanis diameter 2" m 20,835.00 164,554.20 18,538.92 203,928.12
25 A.5.1.1.22.3 Pemasangan pipa galvanis diameter 2½" m 20,835.00 204,576.75 22,541.18 247,952.93
26 A.5.1.1.23 Pemasangan pipa galvanis diameter 3" m 20,835.00 270,169.65 29,100.47 320,105.12
27 A.5.1.1.24 Pemasangan pipa galvanis diameter 4" m 20,835.00 360,802.80 38,163.78 419,801.58
28 A.5.1.1.25 Pemasangan pipa PVC tipe AW diameter 1/2" m 11,784.00 7,100.55 1,888.46 20,773.00
29 A.5.1.1.26 Pemasangan pipa PVC tipe AW diameter 3/4" m 11,784.00 9,569.70 2,135.37 23,489.07
30 A.5.1.1.27 Pemasangan pipa PVC tipe AW diameter 1" m 11,784.00 13,294.35 2,507.84 27,586.18
31 A.5.1.1.28 Pemasangan pipa PVC tipe AW diameter 1½" m 17,676.00 23,212.80 4,088.88 44,977.68
32 A.5.1.1.29 Pemasangan pipa PVC tipe AW diameter 2" m 17,676.00 30,090.15 4,776.62 52,542.76
33 A.5.1.1.30 Pemasangan pipa PVC tipe AW diameter 2 1/2" m 26,514.00 48,239.10 7,475.31 82,228.41
34 A.5.1.1.31 Pemasangan pipa PVC tipe AW diameter 3" m 26,514.00 58,603.95 8,511.80 93,629.75
35 A.5.1.1.32 Pemasangan pipa PVC tipe AW diameter 4" m 26,514.00 95,571.45 12,208.55 134,294.00
36 A.5.1.1.35 Pemasangan pipa beton diameter 20 cm m 24,185.00 63,575.08 8,776.01 96,536.09
37 A.5.1.1.36 Pemasangan pipa beton diameter 30 cm m 65,645.00 93,192.85 15,883.79 174,721.64
38 A.5.1.1.37 Pemasangan pipa beton diameter 60 cm m 65,645.00 168,620.95 23,426.60 257,692.55
39 A.5.1.1.38 Pemasangan pipa beton diameter 80 cm m 65,645.00 233,178.85 29,882.39 328,706.24
40 A.5.1.1.39 Pemasangan pipa beton diameter 100 cm m 65,645.00 283,173.85 34,881.89 383,700.74
41 A.5.1.1.40 Bak kontrol pasangan batu bata uk 30 x 30 tinggi 50 cm bh 53,955.00 151,671.65 20,562.67 226,189.32
42 A.5.1.1.41 Bak kontrol pasangan batu bata uk 45 x 45 tinggi 50 cm bh 213,865.00 237,397.70 45,126.27 496,388.97
43 A.5.1.1.42 Bak kontrol pasangan batu bata uk 60 x 60 tinggi 50 cm bh 325,440.00 357,567.06 68,300.71 751,307.77

Sragen, 10 April 2023


CV DAHIN ADILTHA BASTANTA
0

KASINO
Direktur
DAFTAR HARGA SATUAN TENAGA

NO URAIAN SATUAN HARGA SATUAN


1 Mandor OH 130,000.00
2 Kepala tukang OH 125,000.00
3 Tukang batu OH 120,000.00
4 Tukang kayu OH 120,000.00
5 Tukang cat OH 120,000.00
6 Tukang besi OH 120,000.00
7 Tukang las OH 120,000.00
8 Tukang aluminium OH 120,000.00
9 Tukang pipa OH 120,000.00
10 Pekerja OH 100,000.00
11 Mekanik terlatih OH 110,000.00
12 Mekanik semi terlatih OH 100,000.00
13 Operator terlatih OH 110,000.00
14 Operator semi terlatih OH 100,000.00
15 Pembantu operator OH 90,000.00
16 Buruh terlatih OH 100,000.00
17 Buruh semi terlatih OH 90,000.00
18 Sopir OH 125,000.00
19 Pembantu sopir OH 90,000.00
20 Team leader/Koordinator tenaga ahli OH 150,000.00
21 Tenaga Ahli/ Hydrogeologist/Geophisicist/ Driller OH 150,000.00
22 Asistent Tenaga Ahli OH 110,000.00
23 Crew/Staf tenaga ahli/Operator pompa OH 100,000.00

Sragen, 10 April 2023


CV DAHIN ADILTHA BASTANTA

KASINO
Direktur
DAFTAR HARGA SATUAN BAHAN

NO URAIAN SATUAN HARGA SATUAN

I BAHAN ALAM
1 Batu kali belah m3 185,000.00
2 Batu putih m3 162,000.00
3 Kerikil sungai ayak tanpa pasir m3 235,800.00
4 Batu belah 15-20 cm ( pecah tangan ) m3 224,937.00
5 Batu pecah 7-10 cm ( pecah tangan ) m3 217,575.00
6 Batu pecah 5-7 cm ( pecah tangan ) m3 228,933.00
7 Batu pecah 3-5 cm ( pecah tangan ) m3 230,931.00
8 Batu pecah 2-3 cm ( pecah tangan ) m3 232,929.00
9 Batu pecah 3-5 cm ( pecah mesin) m3 234,936.00
10 Batu pecah 2-3 cm ( pecah mesin) m3 225,000.00
11 Batu pecah 1-2 cm ( pecah mesin ) m3 243,972.00
12 Batu pecah 0,5-1 cm ( pecah mesin ) m3 250,929.00
13 Batu pecah 2-3 cm ( pecah mesin) per kg Kg 155.70
14 Filler / Abu Batu m3 181,800.00
15 Sirtu merapi m3 162,900.00
16 Sirtu m3 175,000.00
17 Pasir halus m3 205,200.00
18 Pasir beton per m3 m3 227,700.00
19 Pasir beton per kg Kg 147.60
20 Pasir pasang m3 195,000.00
21 Pasir urug m3 127,800.00
22 Tanah urug (pilihan) m3 50,000.00
23 Tanah subur m3 79,479.00
24 Batu muka m3 45,450.00
25 Batu gunung m3 199,980.00
26 Batu Kapur Bongkahan m3 209,934.00
27 Batu tempel/palimanan/paras m2 104,490.00
28 Batu tempel hitam/candi m2 106,533.00
29 Batu marmo kuning m2 115,398.00
30 Batu alur (andesit) m2 204,480.00
31 Batu alur (candi) m2 113,580.00
32 Batu carport (koral bulat hitam/putih) perbuah m2 118,170.00
33 Batu andesit (hitam,abu-abu,hijau) 20x20 cm 5,849 m2 146,232.00
34 Batu andesit (hitam,abu-abu,hijau) 30x30 cm 13,751 m2 152,784.00
35 Batu andesit (hitam,abu-abu,hijau) 30x60 cm 33,247 m2 184,707.00
36 Batu andesit (hitam,abu-abu,hijau) 40x40 cm 29,157 m2 182,232.00
37 Batu basalt Brownis Alur ( Coklat) 15x30 cm m2 133,074.00
38 Sandstone rata mesin (putih) 20x20 cm 4,000 m2 99,990.00
39 Sandstone rata mesin (putih) 20x40 cm 8,796 m2 109,944.00
40 Sandstone rata mesin (putih) 40x40 cm 18,173 m2 113,580.00
41 Batu koral Sikat Ambon (putih) m2 4,941.00
42 Batu koral Sikat Lampung ( hitam) m2 4,500.00
43 Batu koral Sikat flores ( hitam pekat,merah& hijau) m2 4,500.00
44 Batu koral Sikat Kupang (hitam,kehijauan) m2 4,500.00
45 Batu tempel/templek Salagedang 20x20cm 4,130 m2 103,257.00
46 Batu tempel/templek Salagedang 20x40 cm 10,181 m2 127,260.00
47 Batu tempel/templek Salagedang 30x30 cm 11,453 m2 127,260.00
48 Batu tempel/templek Salagedang 30x60 cm 26,179 m2 145,440.00
49 Batu tempel/templek Salagedang Acak m2 86,022.00
50 Batu tempel/templek Purwokarta 15 cmx30cm 4,935 m2 126,531.00
51 Batu tempel/templek Purwokarta 20 x 20 cm 4,543 m2 113,580.00
52 Batu tempel/templek Purwokarta 20 x 40 cm 9,942 m2 124,272.00
53 Batu tempel/templek Purwokarta acak m2 89,514.00
54 Batu palimanan 10x20 cm 2,000 m2 99,990.00
55 Batu palimanan 15x30 cm 4,683 m2 104,058.00
56 Batu palimanan 20x20 cm 4,363 m2 109,080.00
57 Batu palimanan 20x40 cm 9,086 m2 113,580.00
58 Batu palimanan 30x30 cm 10,635 m2 118,170.00
59 Batu candi 10x20 cm 1,527 m2 76,356.00
60 Batu candi 15x30 cm 3,816 m2 84,789.00
61 Batu candi 20x20 cm 3,392 m2 84,789.00
62 Batu candi 20x40 cm 7,749 m2 96,858.00
63 Batu candi 30x30 cm 9,267 m2 102,969.00
64 Bitumen ( Aspalt ) kg 11,781.00
65 Aspal curah kg 11,250.00
66 Kayu bakar m3 166,230.00
67 Semen PC. Kg 1,180.00
68 Semen warna Kg 11,700.00
NO URAIAN SATUAN HARGA SATUAN
69 Kawur m3 198,000.00
70 Batu Bata buah 603.00
71 Agregat Halus m3 294,129.00
72 Agregat Kasar m3 254,529.00
73 Air kerja ltr 72.00

II BAHAN KAYU/BAMBU
1 Kayu jati hutan kelas I m3 31,815,000.00
2 Kayu jati hutan kelas II m3 21,816,000.00
3 Kayu jati (ekspose) m3 11,362,500.00
4 Kayu jati lokal (non ekspose) m3 10,453,500.00
5 Kayu bangkirai m3 11,817,000.00
6 Kayu kanfer m3 8,332,398.00
7 Kayu kruing m3 7,090,200.00
8 Kayu meranti m3 7,090,200.00
9 Kayu sengon untuk begesting (papan/kaso) m3 2,476,980.00
10 Kayu usuk jati ekspose m3 10,089,900.00
11 Kayu usuk jati ukuran 5 x 7 m3 6,363,000.00
12 Kayu jati untuk rangka plafond m3 5,850,756.00
13 Kayu usuk bangkirai m3 9,090,000.00
14 Kayu usuk kanfer m3 7,272,000.00
15 Kayu usuk kruing m3 6,908,400.00
16 Kayu kruing untuk rangka plafond m3 5,908,500.00
17 Kayu usuk meranti m3 6,908,400.00
18 Kayu reng jati 2/3 m3 5,454,000.00
19 Kayu reng jati 2/4 m3 5,454,000.00
20 Kayu reng kanfer 2/3 m3 7,272,000.00
21 Kayu reng kruing 2/3 m3 7,272,000.00
22 Plipit kayu jati 1/3 m' 5,454.00
23 Lis kayu profil 5 cm m' 10,908.00
24 Lis kayu profil 4 cm m' 7,272.00
25 Lis kayu profil 3,5 cm m' 5,886.00
26 Lis kayu profil 3 cm m' 5,454.00
27 Kayu lapis/ tripleks tb. 3 mm lembar 50,904.00
28 Kayu lapis/ tripleks tb. 4 mm lembar 57,222.00
29 Kayu lapis/ tripleks tb. 6 mm lembar 74,970.00
30 Kayu lapis/ tripleks tb. 9 mm lembar 140,850.00
31 Kayu lapis/ tripleks tb. 12 mm lembar 159,471.00
32 Kayu lapis/ tripleks tb. 18 mm lembar 227,250.00
33 Teak wood 120 x 240 cm lembar 152,343.00
34 Teak wood 90 x 220 cm lembar 90,387.00
35 Plywood tbl.4 mm (120 x 240) cm lembar 100,206.00
36 Papan akustik softboard 30 x 30 lembar 17,595.00
37 Papan akustik softboard 30 x 60 lembar 54,243.00
38 Papan akustik softboard 40 x 60 lembar 71,991.00
39 Papan akustik softboard 60 x 120 lembar 150,093.00
40 Bambu ori batang 31,770.00
41 Bambu apus batang 19,485.00
42 Dolken kayu kelas III diameter 8-10/400 cm batang 136,350.00

III BAHAN BETON CETAK, GENTENG, LANGIT2


1 Gorong - gorong buis beton dia. 20 cm m' 40,860.00
2 Gorong - gorong buis beton dia. 30 cm m' 54,540.00
3 Gorong - gorong buis beton dia. 40 cm m' 68,130.00
4 Gorong - gorong buis beton dia. 50 cm m' 95,400.00
5 Gorong - gorong buis beton dia. 60 cm m' 123,111.00
6 Gorong - gorong buis beton dia. 80 cm m' 181,800.00
7 Gorong - gorong buis beton dia. 100 cm m' 227,250.00
8 Gorong - gorong buis beton 1/2 dia. 20 cm m' 27,270.00
9 Gorong - gorong buis beton 1/2 dia. 30 cm m' 38,394.00
10 Box Culvert 800mm x 800mm x 1000mm, 14,5 ton buah 1,295,280.00
11 Box Culvert 1000mm x 1000mm x 1000mm, 14,5 ton buah 1,977,030.00
12 Tegel paving I, tb 6 cm K 175 m2 58,176.00
13 Tegel paving I, tb 8 cm K 225 m2 77,517.00
14 Tegel paving I, tb 8 cm K 250 m2 82,674.00
15 Tegel paving I, tb 8 cm K 300 m2 88,128.00
16 Tegel paving segi enam, tb 6 cm K 175 m2 53,154.00
17 Tegel paving segi enam, warna tb 6 cm K 175 m2 58,608.00
18 Tegel paving kawung, warna tb 6 cm K 175 m2 62,604.00
19 Kanstin L uk 40.40.12 cm K 250 m2 198,954.00
20 Kanstin I uk 40.30.12 cm K 250 m2 102,969.00
21 Genteng kodok kebumen bh 2,835.00
22 Genteng magas kebumen bh 2,799.00
23 Genteng mantili mojolaban bh 3,708.00
24 Genteng morando kebumen bh 2,178.00
25 Genteng pelentong kebumen bh 1,521.00
NO URAIAN SATUAN HARGA SATUAN
26 Genteng beton bh 6,174.00
27 Genteng Keramik bh 8,937.00
28 Bubung genteng kebumen bh 8,793.00
29 Bubung genteng mojolaban bh 6,102.00
31 Bubung genteng beton bh 14,310.00
32 Bubung genteng keramik bh 30,105.00
33 Roster beton 12x11x24 buah 6,831.00
35 Bata berongga ekspose kebumen buah 3,339.00
36 Bata berongga ekspose lokal buah 1,800.00
37 Penutup atap bitumen selulose motif genteng m2 162,234.00
38 Bubung atap bitumen selulose motif genteng m' 97,299.00
39 Penutup atap bitumen selulose motif gelombang m2 154,602.00
40 Bubung atap bitumen selulose motif gelombang m' 92,718.00
41 Penutup atap fibre glass gelombang (180 x 90) cm lembar 56,502.00
42 Penutup atap aluminium gelombang m2 193,428.00
43 Aluminium foil m2 40,500.00
44 Gipsum lembar 65,223.00
45 Harflek m2 19,998.00
46 Calsiboard m2 48,429.00
47 List gipsum profil 5-8 cm m 8,577.00
48 List gipsum profil 10-12 cm m 12,213.00
49 Genteng metal kelas I m2 208,845.00
50 Kerpus genting metal kelas I Bh 51,993.00
51 Genteng metal kelas II m2 112,203.00
52 Kerpus genting metal kelas II Bh 29,880.00
53 Tepung Gipsum kg 3,267.00
54 GRC 3 mm motif m2 49,086.00
GRC 4 mm motif m2 59,040.00
GRC 5 mm motif m2 68,130.00

IV BAHAN KERAMIK
1 Keramik dinding 10 x 20 cm kelas I buah 1,359.00
2 Keramik dinding 20 x 25 cm kelas I buah 2,988.00
3 Keramik dinding 20 x 20 cm kelas I buah 2,763.00
4 Keramik dinding artistik 7 x 20 cm kelas I buah 6,669.00
5 Keramik dinding artistik 10 x 20 cm kelas I buah 9,540.00
6 Keramik dinding marmer 100 x 100 cm kelas I buah 155,106.00
7 Keramik lantai 20 x 20 cm kelas I buah 2,079.00
8 Keramik lantai 30 x 30 cm kelas I buah 5,760.00
9 Keramik lantai 40 x 40 cm kelas I buah 10,989.00
10 Keramik lantai 60 x 60 cm kelas I buah 36,261.00
11 Keramik lantai 60 x 60 cm kelas I (homogeneous) buah 45,081.00
12 Keramik dinding 10 x 20 cm kelas II buah 1,089.00
13 Keramik dinding 20 x 25 cm kelas II buah 2,538.00
14 Keramik dinding 20 x 20 cm kelas II buah 2,079.00
15 Keramik dinding artistik 7 x 20 cm kelas II buah 3,816.00
16 Keramik dinding artistik 10 x 20 cm kelas II buah 5,715.00
17 Keramik dinding marmer 100 x 100 cm kelas II buah 116,352.00
18 Keramik lantai 20 x 20 cm kelas II buah 2,079.00
19 Keramik lantai 30 x 30 cm kelas II buah 4,500.00
20 Keramik lantai 40 x 40 cm kelas II buah 9,090.00
21 Keramik lantai 60 x 60 cm kelas II buah 34,722.00
22 Keramik lantai 60 x 60 cm kelas II (homogeneous) buah 37,719.00
23 Tegel granit 60 x 60 cm kelas I buah 81,810.00
24 Tegel granit 60 x 60 cm kelas II buah 45,081.00
25 Tegel granit 40 x 40 cm buah 15,849.00
26 Tegel granit 30 x 30 cm buah 6,903.00
27 Keramik plin 10 x 20 cm kelas I buah 2,178.00
28 Parquet kayu m2 79,623.00
29 Lantai kayu (gymfloor) m2 99,477.00
30 Lantai vinyl karet buah 9,540.00
31 Floor hardener kg 1,998.00
32 Vinyl 30 x 30 buah 2,808.00
33 Kloset porselin jongkok kelas I buah 227,250.00
34 Kloset porselin jongkok kelas II buah 125,145.00
35 Kloset duduk/Monoblok kelas I buah 2,227,050.00
36 Kloset duduk/Monoblok kelas II buah 1,363,500.00
37 Bak fiberglass sudut 0,3 m3 buah 318,150.00
38 Urinoir buah 909,000.00
39 Wastafel buah 409,050.00
40 Bak teraso (bak air KM) buah 363,600.00
41 Bak Kip fiberglass (bak air KM) buah 772,650.00
42 Bak Kip keramik (bak air KM) buah 295,380.00
43 Bak cuci Stainles steel 1 bak buah 222,660.00
44 Bak cuci Stainles steel 2 bak buah 395,370.00
45 Lem Vinyl kg 18,900.00
46 Wallpaper 50 cm m' 63,630.00
NO URAIAN SATUAN HARGA SATUAN
47 Lem kg 26,541.00

V BAHAN BESI / LOGAM


1 Bindrad kg 17,226.00
2 Baja gulungan ukuran ringan kg 13,671.00
3 Baja anyaman bronjong kg 20,070.00
4 Baja ( baut - baut ) kg 31,770.00
5 Baja ( paku jembatan ) kg 25,668.00
6 Besi beton kg 9,747.00
7 Wire mesh M6 lembar 340,830.00
8 Wire mesh M8 U50 lembar 613,530.00
9 Wire mesh M10 U50 lembar 958,950.00
10 Besi plat kg 15,858.00
11 Besi profil kg 13,815.00
12 Besi IWF kg 15,849.00
13 Kawat galvanis kg 18,180.00
14 Kawat nyamuk m2 18,180.00
15 Kawat kasa m2 27,270.00
16 Kawat harmonika m2 26,172.00
17 Kawat duri m 9,954.00
18 Pintu lipat besi m2 568,080.00
19 Pintu lipat folding gate 0,5mm m2 568,080.00
20 Pintu rolling door besi m2 499,950.00
21 Pintu rolling door aluminium m2 545,400.00
22 Profil aluminium 3" silver m 63,000.00
23 Profil aluminium 4" silver m 72,000.00
24 Profil aluminium 3" brown m 64,863.00
25 Profil aluminium 4" brown m 72,495.00
26 Aluminium strip 8 cm m 22,248.00
27 Skrup fixer bh 3,330.00
27 Paku kg 13,887.00
28 Paku beton kg 30,537.00
29 Paku skrup kg 33,372.00
30 Hollow 4x4 cm btg 28,953.00
31 Hollow 2x2 cm btg 20,259.00
32 Ramset/dina bolt bh 5,454.00
33 Tralis besi strip m2 181,800.00
34 Besi strip kg 15,903.00
35 Talang seng t = 0.3 mm L = 45 m' 31,770.00
36 Talang seng t = 0.3 mm L = 55 m' 31,500.00
37 Talang seng t = 0.3 mm L = 60 m' 35,406.00
38 Talang seng t = 0.3 mm L = 70 m' 39,771.00
39 Talang seng t = 0.3 mm L = 90 m' 51,768.00
40 Seng gelombang 0,8 x 1,80 lembar 65,880.00
41 Seng gelombang 0,8 x 2,10 lembar 77,220.00
42 Seng plat (90 x 180) lembar 39,600.00
43 Galvalum tebal 0,3 mm m2 41,445.00
44 Sunscreen alluminium m2 450,000.00
45 Teralis besi tempa m2 431,730.00
46 Teralis besi stainlis m2 477,180.00

VI BAHAN KACA
1 Kaca bening 5 mm m2 73,584.00
2 Kaca bening 8 mm m2 142,236.00
3 Kaca rayband 5 mm m2 92,790.00
4 Kaca rayband 8 mm m2 174,015.00
5 Kaca jeruk 3 mm m2 81,810.00
6 Kaca jeruk 5 mm m2 168,489.00
7 Kaca es 3 mm m2 77,220.00
8 Kaca es 5 mm m2 109,080.00
9 Kaca cermin 5 mm m2 139,473.00
10 Kaca Bening 3 mm m2 57,663.00
11 Kaca tempered 12 mm m2 1,499,850.00

VII BAHAN PIPA


1 Pipa black Steel 6" Sched # 20 m' 241,425.00
2 Screw stainless steel dia 6 mm m' 313,128.00
3 Reducer 10" ke 6" buah 111,114.00
4 Gravel m' 263,385.00
5 Stemvet Kg 124,488.00
6 Bentonite Kg 10,395.00
7 Pipa Piezometer GIP 1" m' 509.04
8 Lem pipa kg 90,387.00
9 Baut 5/8 " buah 9,954.00
10 Kunci gembok buah 27,117.00
11 Plastik Cor buah 454.50
NO URAIAN SATUAN HARGA SATUAN
12 Pipa PVC 10 mm ( 1/2 ) " AW m 4,581.00
13 Pipa PVC 20 mm ( 3/4 ) " AW m 6,174.00
14 Pipa PVC 25 mm ( 1 ) " AW m 8,577.00
15 Pipa PVC 30 mm ( 1 1/4 ) " AW m 12,942.00
16 Pipa PVC 40 mm ( 1 1/2 ) " AW m 14,976.00
17 Pipa PVC 50 mm ( 2 ) " AW m 19,413.00
18 Pipa PVC 64 mm ( 2 1/2) " AW m 31,122.00
19 Pipa PVC 80 mm ( 3 ) " AW m 37,809.00
20 Pipa PVC 100 mm ( 4 ) " AW m 61,659.00
21 Pipa PVC 150 mm ( 6 ) " AW m 143,253.00
22 Pipa besi Galvanis ( GIP ) DN 100 mm 4" m 232,776.00
23 Pipa besi Galvanis ( GIP ) DN 75 mm 3" m 174,303.00
24 Pipa besi Galvanis ( GIP ) DN 50 mm 2,5" m 131,985.00
25 Pipa besi Galvanis ( GIP ) DN 50 mm 2" m 106,164.00
26 Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" m 77,805.00
27 Pipa besi Galvanis ( GIP ) DN 30 mm 1 1/4" m 57,150.00
28 Pipa besi Galvanis ( GIP ) DN 25 mm 1" m 45,738.00
29 Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" m 32,355.00
30 Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" m 25,812.00
31 Tangki fiber kapasitas 0,50 m3 buah 1,250,271.00
32 Tangki fiber kapasitas 1 m3 buah 2,772,450.00
33 Tangki fiber kapasitas 2 m3 buah 5,317,650.00
34 Tangki fiber kapasitas 3 m3 buah 6,135,750.00
35 Tangki fiber kapasitas 5 m3 buah 9,203,580.00
36 Pompa Submersible kap. 0,5 - 1 L/Dt buah 16,452,900.00
37 Pompa Submersible kap. 1 - 2 L/Dt buah 20,725,200.00
38 Pompa Submersible kap. 2 - 3 L/Dt buah 28,269,900.00
39 Pompa Submersible kap. 15 - 17,5 L/Dt buah 50,994,900.00
40 Pompa Boster kap. 0,5 - 1 L/Dt buah 9,203,580.00
41 Pompa Boster kap. 1 - 2 L/Dt buah 15,316,650.00
42 Pompa Boster kap. 2 - 3 L/Dt buah 20,770,650.00
43 Pompa Jet pump 0,5 - 1 L/Dt buah 4,704,030.00
44 Pompa Jet pump 1 - 1,5 L/Dt buah 6,472,080.00
45 Pelampung automatis DN 15 buah 117,297.00
46 Pelampung automatis DN 25 buah 195,759.00
47 Pelampung automatis DN 40 buah 314,217.00
48 Water meter DN 20 buah 156,564.00
49 Water meter DN 25 buah 195,687.00
50 Water meter DN 40 buah 274,005.00
51 Water meter DN 50 buah 391,590.00
52 Water meter DN 80 buah 977,931.00
53 Water meter DN 100 buah 1,434,402.00
54 Water meter DN 150 buah 2,745,180.00
55 Stabilizer buah 4,317,750.00
56 Panel buah 3,499,650.00

VIII BAHAN LAIN-LAIN


1 Kunci tanam kelas I buah 181,800.00
2 Kunci tanam kelas II buah 118,170.00
3 Kunci silinder kamar mandi buah 90,000.00
4 Engsel pintu buah 16,506.00
5 Engsel jendela buah 12,510.00
6 Grendel ukuran besar buah 36,360.00
7 Grendel ukuran kecil buah 10,251.00
8 Kait angin buah 11,358.00
9 Espanyolete buah 57,663.00
10 Spring Knife buah 19,701.00
11 Door closer buah 249,930.00
12 Door Holder buah 22,905.00
13 Door stops buah 34,722.00
14 Rel pintu geser buah 148,140.00
15 Fiberglass ( uk. 0,80 m x 3,00 m ) lembar 95,400.00
16 Cat tembok eksterior Kg 108,612.00
17 Cat tembok interior kelas I Kg 44,064.00
18 Cat tembok interior kelas II Kg 22,725.00
19 Cat kayu / besi Kg 52,209.00
20 Cat genteng Kg 49,950.00
21 Plamir kayu Kg 28,719.00
22 Plamir tembok (alkali) Kg 47,124.00
23 Plamir tembok Kg 11,997.00
24 Teer liter 40,644.00
25 Meny Kg 31,770.00
26 Minyak cat liter 30,717.00
27 Minyak tanah liter HET
28 Dempul Kg 27,270.00
29 Wood filler Kg 35,307.00
30 Amplas kayu lembar 4,086.00
NO URAIAN SATUAN HARGA SATUAN
31 Amplas besi lembar 8,721.00
32 Minyak begesting liter 8,721.00
33 Pelitur liter 53,514.00
34 Vernis liter 48,132.00
35 Soda api Kg 33,156.00
36 Lem kayu Kg 21,816.00
37 Kuas 1" buah 5,904.00
38 Kuas 1 1/2" buah 8,487.00
39 Kuas 2" buah 10,935.00
40 Kuas 3" buah 12,996.00
41 Kuas 4" buah 14,994.00
42 Kran air 1/2" buah 18,180.00
43 Kran air 3/4" buah 27,270.00
44 Seal tape buah 4,950.00
45 Floor drain plastik buah 15,849.00
46 Floor drain stainles buah 41,445.00
47 Vertical blinds/venetions blinds m2 68,571.00
48 Sealant tube 76,788.00
49 Pintu alumunium KM/WC kelas I buah 636,300.00
50 Pintu alumunium KM/WC kelas II buah 318,150.00
51 Pintu PVC Polos buah 270,000.00
52 Pintu PVC Motif buah 343,818.00
53 Pintu lipat PVC m2 165,420.00
54 Tali ijuk Kg 12,213.00
55 Alat kerja (sekop, ikrak dll) unit 60,714.00
56 Kawat las Kg 35,307.00
57 Strorox Kg 20,943.00
58 Waterstop lbr 150mm m 114,966.00
59 Waterstop lbr 200mm m 134,019.00
60 Waterstop lbr 230-320mm m 151,740.00
61 Sabun kg 15,885.00
62 Engsel angin buah 15,993.00
63 Engsel pintu klam buah 17,037.00
64 Gebalan rumput biasa m2 14,175.00
65 Gebalan rumput hias m2 27,270.00
66 U ditch 800x800x1200 mm unit 818,100.00
67 U ditch 1000x1000x1200 mm unit 1,363,500.00
68 U ditch 1200x1200x1200 mm unit 2,081,610.00
69 L Shape 2740x1000x4400 mm unit 8,680,950.00
70 Bronjong Pabrikasi Ukuran 2x1x0,5 m kawat 3 mm buah 218,160.00
71 Geotextil Non Woven m2 10,224.00
72 Plafond PVC Klas I m2 145,440.00
73 Wood plank m' 18,180.00
74 Box Culvert 1200mm x 1200mm x 1000mm, 14,5 ton buah 2,691,000.00

Sragen, 2019
Konsultan Perencana
CV. DELTA MULTITAMA

M. ASIH ANGGOROWATI, S.T


Direktur
I. HARGA SATUAN PEKERJAAN TANAH

A.2.3.1.1 Penggalian 1 m³ tanah biasa sedalam 1 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.750 100,000.00 75,000.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 78,250.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 78,250.00
E Overhead & Profit (10%) 10% x D 7,825.00
F Harga Satuan Pekerjaan (D+E) 86,075.00

A.2.3.1.2 Penggalian 1 m³ tanah biasa sedalam 2 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 95,850.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 95,850.00
E Overhead & Profit (10%) 10% x D 9,585.00
F Harga Satuan Pekerjaan (D+E) 105,435.00

A.2.3.1.3 Menggali 1 m³ tanah biasa sedalam 3 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.050 100,000.00 105,000.00
Mandor L.04 OH 0.067 130,000.00 8,710.00
JUMLAH TENAGA KERJA 113,710.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 113,710.00
E Overhead & Profit (10%) 10% x D 11,371.00
F Harga Satuan Pekerjaan (D+E) 125,081.00
A.2.3.1.4 Menggali 1 m³ tanah keras sedalam 1 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Mandor L.04 OH 0.032 130,000.00 4,160.00
JUMLAH TENAGA KERJA 104,160.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 104,160.00
E Overhead & Profit (10%) 10% x D 10,416.00
F Harga Satuan Pekerjaan (D+E) 114,576.00

A.2.3.1.5 Menggali 1 m³ tanah cadas sedalam 1 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Mandor L.04 OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 157,800.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 157,800.00
E Overhead & Profit (10%) 10% x D 15,780.00
F Harga Satuan Pekerjaan (D+E) 173,580.00

A.2.3.1.6 Menggali 1 m³ tanah lumpur sedalam 1 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.200 100,000.00 120,000.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 125,850.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 125,850.00
E Overhead & Profit (10%) 10% x D 12,585.00
F Harga Satuan Pekerjaan (D+E) 138,435.00
A.2.3.1.7 Pengerjaan stripping 1 m² tanah tebing setinggi 1 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 5,650.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,650.00
E Overhead & Profit (10%) 10% x D 565.00
F Harga Satuan Pekerjaan (D+E) 6,215.00

A.2.3.1.8 Pembuangan 1 m³ tanah sejauh 30 m

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.330 100,000.00 33,000.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,300.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 34,300.00
E Overhead & Profit (10%) 10% x D 3,430.00
F Harga Satuan Pekerjaan (D+E) 37,730.00

A.2.3.1.9 Pengurugan kembali 1 m³ galian tanah

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Mandor L.04 OH 0.008 130,000.00 1,083.33
JUMLAH TENAGA KERJA 26,083.33
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,083.33
E Overhead & Profit (10%) 10% x D 2,608.33
F Harga Satuan Pekerjaan (D+E) 28,691.67
A.2.3.1.10 Pemadatan tanah 1 m³ tanah (per 20 cm)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.500 100,000.00 50,000.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 56,500.00
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,500.00
E Overhead & Profit (10%) 10% x D 5,650.00
F Harga Satuan Pekerjaan (D+E) 62,150.00

A.2.3.1.11 Pengurugan 1 m³ dengan pasir urug

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 31,300.00
B BAHAN
Pasir urug m3 1.200 127,800.00 153,360.00
JUMLAH HARGA BAHAN 153,360.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 184,660.00
E Overhead & Profit (10%) 10% x D 18,466.00
F Harga Satuan Pekerjaan (D+E) 203,126.00

A.2.3.1.12 Pemasangan 1 m³ lapisan pudel campuran 1 KP : 3 PP : 7 TL

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang batu L.02 OH 0.400 120,000.00 48,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.080 130,000.00 10,400.00

JUMLAH TENAGA KERJA 143,400.00


B BAHAN
Batu Kapur Bongkahan m3 0.135 233,300.00 31,495.50
Pasir pasang m3 0.400 216,100.00 86,440.00
Tanah urug (pilihan) m3 0.948 49,000.00 46,452.00
JUMLAH HARGA BAHAN 164,387.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 307,787.50
E Overhead & Profit (10%) 10% x D 30,778.75
F Harga Satuan Pekerjaan (D+E) 338,566.25
A.2.3.1.13 Pemasangan 1 m² lapisan ijuk tebal 10 cm untuk bidang resapan

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 16,950.00
B BAHAN
Tali ijuk Kg 6.000 12,213.00 73,278.00
JUMLAH HARGA BAHAN 73,278.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,228.00
E Overhead & Profit (10%) 10% x D 9,022.80
F Harga Satuan Pekerjaan (D+E) 99,250.80

A.2.3.1.14 Pengurugan 1 m³ sirtu padat (sirtu merapi)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Sirtu merapi m3 1.200 162,900.00 195,480.00
JUMLAH HARGA BAHAN 195,480.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 223,730.00
E Overhead & Profit (10%) 10% x D 22,373.00
F Harga Satuan Pekerjaan (D+E) 246,103.00

A.2.3.1.15 Pengurugan 1 m³ sirtu

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 28,250.00
B BAHAN
Sirtu m3 1.200 175,000.00 210,000.00
JUMLAH HARGA BAHAN 210,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 238,250.00
E Overhead & Profit (10%) 10% x D 23,825.00
F Harga Satuan Pekerjaan (D+E) 262,075.00
A.2.3.1.16 Pengurugan tanah urug

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.280 100,000.00 28,000.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 31,250.00
B BAHAN
Tanah urug (pilihan) m3 1.200 50,000.00 60,000.00
JUMLAH HARGA BAHAN 60,000.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,250.00
E Overhead & Profit (10%) 10% x D 9,125.00
F Harga Satuan Pekerjaan (D+E) 100,375.00

A.2.3.1.17 Pengurugan tanah kembali dipadatkan

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.750 100,000.00 75,000.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 76,690.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 76,690.00
E Overhead & Profit (10%) 10% x D 7,669.00
F Harga Satuan Pekerjaan (D+E) 84,359.00
III. HARGA SATUAN PEKERJAAN BETON

A.4.1.1.1 Membuat beton mutu f'c = 7,4 MPa (K 100)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 247.000 1,180.00 291,460.00
Pasir beton per kg Kg 869.000 147.60 128,264.40
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 999.000 155.70 155,544.30
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 590,748.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 803,038.70
E Overhead & Profit (10%) 10% x D 80,303.87
F Harga Satuan Pekerjaan (D+E) 883,342.57

A.4.1.1.2 Membuat beton mutu f'c = 9,8 MPa (K 125)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 276.000 1,180.00 325,680.00
Pasir beton per kg Kg 828.000 147.60 122,212.80
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,012.000 155.70 157,568.40
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 620,941.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 833,231.20
E Overhead & Profit (10%) 10% x D 83,323.12
F Harga Satuan Pekerjaan (D+E) 916,554.32

A.4.1.1.3 Membuat beton mutu f'c = 12,2 MPa (K 150)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 299.000 1,180.00 352,820.00
Pasir beton per kg Kg 799.000 147.60 117,932.40
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,017.000 155.70 158,346.90
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 644,579.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 856,869.30
E Overhead & Profit (10%) 10% x D 85,686.93
F Harga Satuan Pekerjaan (D+E) 942,556.23
A.A.4.1.1.4 Membuat lantai kerja beton mutu f'c = 7.4 MPa (K 100)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.200 100,000.00 120,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 154,300.00
B BAHAN
Semen PC. Kg 230.000 1,180.00 271,400.00
Pasir beton per kg Kg 893.000 147.60 131,806.80
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,027.000 155.70 159,903.90
Air kerja ltr 200.000 72.00 14,400.00
JUMLAH HARGA BAHAN 577,510.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 731,810.70
E Overhead & Profit (10%) 10% x D 73,181.07
F Harga Satuan Pekerjaan (D+E) 804,991.77

A.A.4.1.1.5 Membuat beton mutu f'c = 14,5 MPa (K 175)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 326.000 1,180.00 384,680.00
Pasir beton per kg Kg 760.000 147.60 112,176.00
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,029.000 155.70 160,215.30
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 672,551.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 884,841.30
E Overhead & Profit (10%) 10% x D 88,484.13
F Harga Satuan Pekerjaan (D+E) 973,325.43

A.A.4.1.1.6 Membuat beton mutu f'c = 16,9 MPa (K 200)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 352.000 1,180.00 415,360.00
Pasir beton per kg Kg 731.000 147.60 107,895.60
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,031.000 155.70 160,526.70
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 699,262.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 911,552.30
E Overhead & Profit (10%) 10% x D 91,155.23
F Harga Satuan Pekerjaan (D+E) 1,002,707.53
A.4.1.1.7 Membuat beton mutu f'c = 19,3 MPa (K 225)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 371.000 1,180.00 437,780.00
Pasir beton per kg Kg 698.000 147.60 103,024.80
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,047.000 155.70 163,017.90
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 719,302.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 931,592.70
E Overhead & Profit (10%) 10% x D 93,159.27
F Harga Satuan Pekerjaan (D+E) 1,024,751.97

A.4.1.1.8 Membuat beton mutu f'c = 21,7 MPa (K 250)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 384.000 1,180.00 453,120.00
Pasir beton per kg Kg 692.000 147.60 102,139.20
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,039.000 155.70 161,772.30
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 732,511.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 944,801.50
E Overhead & Profit (10%) 10% x D 94,480.15
F Harga Satuan Pekerjaan (D+E) 1,039,281.65

A.4.1.1.9 Membuat beton mutu f'c = 24,0 MPa (K 275)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 406.000 1,180.00 479,080.00
Pasir beton per kg Kg 684.000 147.60 100,958.40
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,026.000 155.70 159,748.20
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 755,266.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 967,556.60
E Overhead & Profit (10%) 10% x D 96,755.66
F Harga Satuan Pekerjaan (D+E) 1,064,312.26
A.4.1.1.10 Membuat beton mutu f'c = 26,4 MPa (K 300)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 125,000.00 3,500.00
Mandor L.04 OH 0.083 130,000.00 10,790.00
JUMLAH TENAGA KERJA 212,290.00
B BAHAN
Semen PC. Kg 413.000 1,180.00 487,340.00
Pasir beton per kg Kg 681.000 147.60 100,515.60
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,021.000 155.70 158,969.70
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 762,305.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 974,595.30
E Overhead & Profit (10%) 10% x D 97,459.53
F Harga Satuan Pekerjaan (D+E) 1,072,054.83

A.4.1.1.11 Membuat beton mutu f'c = 28,8 MPa (K 325)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 2.100 100,000.00 210,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 270,025.00
B BAHAN
Semen PC. Kg 439.000 1,180.00 518,020.00
Pasir beton per kg Kg 670.000 147.60 98,892.00
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,006.000 155.70 156,634.20
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 789,026.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,059,051.20
E Overhead & Profit (10%) 10% x D 105,905.12
F Harga Satuan Pekerjaan (D+E) 1,164,956.32

A.4.1.1.12 Membuat beton mutu f'c = 31,2 MPa (K 350)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 2.100 100,000.00 210,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.105 130,000.00 13,650.00
JUMLAH TENAGA KERJA 270,025.00
B BAHAN
Semen PC. Kg 448.000 1,180.00 528,640.00
Pasir beton per kg Kg 667.000 147.60 98,449.20
Batu pecah 2-3 cm ( pecah mesin) per kg Kg 1,000.000 155.70 155,700.00
Air kerja ltr 215.000 72.00 15,480.00
JUMLAH HARGA BAHAN 798,269.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,068,294.20
E Overhead & Profit (10%) 10% x D 106,829.42
F Harga Satuan Pekerjaan (D+E) 1,175,123.62
A.4.1.1.17 Pembesian dengan besi polos atau besi ulir

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA kg
Pekerja L.01 OH 0.0070 100,000.00 700.00
Tukang besi L.02 OH 0.0070 120,000.00 840.00
Kepala tukang L.03 OH 0.0007 125,000.00 87.50
Mandor L.04 OH 0.0004 130,000.00 52.00
1,679.50
B BAHAN
Besi beton kg 1.050 9,747.00 10,234.35
Bindrad kg 0.015 17,226.00 258.39
JUMLAH HARGA BAHAN 10,492.74
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,172.24
E Overhead & Profit (10%) 10% x D 1,217.22
F Harga Satuan Pekerjaan (D+E) 13,389.46

7394.20 Pemasangan 1 m² bekisting untuk pondasi (4x pakai) (4x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.520 100,000.00 52,000.00
Tukang kayu L.02 OH 0.260 120,000.00 31,200.00
Kepala tukang L.03 OH 0.026 125,000.00 3,250.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 89,830.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.010 2,476,980.00 24,769.80
Paku kg 0.075 13,887.00 1,041.52
Minyak begesting liter 0.025 8,721.00 218.03
JUMLAH HARGA BAHAN 26,029.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 115,859.35
E Overhead & Profit (10%) 10% x D 11,585.94
F Harga Satuan Pekerjaan (D+E) 127,445.29

7394.21 Pemasangan 1 m² bekisting untuk sloof dan ring balk (4x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.480 100,000.00 48,000.00
Tukang kayu L.02 OH 0.240 120,000.00 28,800.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.026 130,000.00 3,380.00
JUMLAH TENAGA KERJA 83,305.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.011 2,476,980.00 27,866.02
Paku kg 0.075 13,887.00 1,041.52
Minyak begesting liter 0.025 8,721.00 218.03
JUMLAH HARGA BAHAN 29,125.58
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 112,430.58
E Overhead & Profit (10%) 10% x D 11,243.06
F Harga Satuan Pekerjaan (D+E) 123,673.63
7394.22 Pemasangan 1 m² bekisting untuk kolom (3x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,015.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.013 2,476,980.00 33,026.40
Paku kg 0.133 13,887.00 1,851.60
Minyak begesting liter 0.067 8,721.00 581.40
Kayu meranti m3 0.005 7,090,200.00 35,451.00
Kayu lapis/ tripleks tb. 9 mm lembar 0.117 140,850.00 16,432.50
Bambu apus batang 0.667 19,485.00 12,990.00
JUMLAH HARGA BAHAN 100,332.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 214,347.90
E Overhead & Profit (10%) 10% x D 21,434.79
F Harga Satuan Pekerjaan (D+E) 235,782.69

7394.23 Pemasangan 1 m² bekisting untuk balok dan konsol (3x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,015.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.013 2,476,980.00 33,026.40
Paku kg 0.133 13,887.00 1,851.60
Minyak begesting liter 0.067 8,721.00 581.40
Kayu meranti m3 0.006 7,090,200.00 42,541.20
Kayu lapis/ tripleks tb. 9 mm lembar 0.117 140,850.00 16,432.50
Bambu apus batang 0.667 15,100.00 10,066.67
JUMLAH HARGA BAHAN 104,499.77
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 218,514.77
E Overhead & Profit (10%) 10% x D 21,851.48
F Harga Satuan Pekerjaan (D+E) 240,366.24
7394.24 Pemasangan 1 m² bekisting untuk plat lantai (3x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,015.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.013 2,476,980.00 33,026.40
Paku kg 0.133 13,887.00 1,851.60
Minyak begesting liter 0.067 8,721.00 581.40
Kayu meranti m3 0.005 7,090,200.00 35,451.00
Kayu lapis/ tripleks tb. 3 mm lembar 0.117 50,904.00 5,938.80
Bambu apus batang 2.000 15,100.00 30,200.00
JUMLAH HARGA BAHAN 107,049.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 221,064.20
E Overhead & Profit (10%) 10% x D 22,106.42
F Harga Satuan Pekerjaan (D+E) 243,170.62

7394.25 Pemasangan 1 m² bekisting untuk dinding (3x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,015.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.010 2,476,980.00 24,769.80
Paku kg 0.133 13,887.00 1,851.60
Minyak begesting liter 0.067 8,721.00 581.40
Kayu meranti m3 0.007 7,090,200.00 47,268.00
Kayu lapis/ tripleks tb. 3 mm lembar 0.117 50,904.00 5,938.80
Bambu apus batang 2.333 19,485.00 45,465.00
JUMLAH HARGA BAHAN 125,874.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 239,889.60
E Overhead & Profit (10%) 10% x D 23,988.96
F Harga Satuan Pekerjaan (D+E) 263,878.56
7394.26 Pemasangan 1 m² bekisting untuk tangga (3x pakai)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.660 100,000.00 66,000.00
Tukang kayu L.02 OH 0.330 120,000.00 39,600.00
Kepala tukang L.03 OH 0.033 125,000.00 4,125.00
Mandor L.04 OH 0.033 130,000.00 4,290.00
JUMLAH TENAGA KERJA 114,015.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.010 2,476,980.00 24,769.80
Paku kg 0.133 13,887.00 1,851.60
Minyak begesting liter 0.050 8,721.00 436.05
Kayu meranti m3 0.005 7,090,200.00 35,451.00
Kayu lapis/ tripleks tb. 3 mm lembar 0.117 50,904.00 5,938.80
Bambu apus batang 0.667 19,485.00 12,990.00
JUMLAH HARGA BAHAN 81,437.25
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 195,452.25
E Overhead & Profit (10%) 10% x D 19,545.23
F Harga Satuan Pekerjaan (D+E) 214,997.48

A.4.1.1.27 Pemasangan 1 m² bekisting jembatan untuk pengecoran beton

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 22,665.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.0264 2,476,980.00 65,392.27
Paku kg 0.600 13,887.00 8,332.20
Bambu apus batang 0.500 19,485.00 9,742.50
JUMLAH HARGA BAHAN 83,466.97
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,131.97
E Overhead & Profit (10%) 10% x D 10,613.20
F Harga Satuan Pekerjaan (D+E) 116,745.17
A.4.1.1.28 Membuat pondasi beton bertulang (150 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 5.300 100,000.00 530,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.300 120,000.00 156,000.00
Tukang besi L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.262 125,000.00 32,750.00
Mandor L.04 OH 0.265 130,000.00 34,450.00
JUMLAH TENAGA KERJA 912,200.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.200 2,476,980.00 495,396.00
Paku kg 1.500 13,887.00 20,830.50
Minyak begesting liter 0.400 8,721.00 3,488.40
Besi beton kg 157.500 9,747.00 1,535,152.50
Bindrad kg 2.250 17,226.00 38,758.50
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
JUMLAH HARGA BAHAN 2,795,313.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 3,707,513.90
E Overhead & Profit (10%) 10% x D 370,751.39
F Harga Satuan Pekerjaan (D+E) 4,078,265.29

A.4.1.1.29 Membuat sloof beton bertulang (200 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 5.650 100,000.00 565,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.560 120,000.00 187,200.00
Tukang besi L.02 OH 1.400 120,000.00 168,000.00
Kepala tukang L.03 OH 0.323 125,000.00 40,375.00
Mandor L.04 OH 0.283 130,000.00 36,790.00
JUMLAH TENAGA KERJA 1,030,365.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.270 2,476,980.00 668,784.60
Paku kg 2.000 13,887.00 27,774.00
Minyak begesting liter 0.600 8,721.00 5,232.60
Besi beton kg 210.000 9,747.00 2,046,870.00
Bindrad kg 3.000 17,226.00 51,678.00
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
JUMLAH HARGA BAHAN 3,502,027.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,532,392.20
E Overhead & Profit (10%) 10% x D 453,239.22
F Harga Satuan Pekerjaan (D+E) 4,985,631.42
A.4.1.1.30 Membuat kolom beton bertulang (300 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 7.050 100,000.00 705,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.650 120,000.00 198,000.00
Tukang besi L.02 OH 2.100 120,000.00 252,000.00
Kepala tukang L.03 OH 0.403 125,000.00 50,375.00
Mandor L.04 OH 0.353 130,000.00 45,890.00
JUMLAH TENAGA KERJA 1,284,265.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.400 2,476,980.00 990,792.00
Paku kg 4.000 13,887.00 55,548.00
Minyak begesting liter 2.000 8,721.00 17,442.00
Besi beton kg 315.000 9,747.00 3,070,305.00
Bindrad kg 4.500 17,226.00 77,517.00
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
Kayu lapis/ tripleks tb. 3 mm lembar 0.150 50,904.00 7,635.60
Bambu apus batang 20.000 19,485.00 389,700.00
JUMLAH HARGA BAHAN 5,310,627.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 6,594,892.60
E Overhead & Profit (10%) 10% x D 659,489.26
F Harga Satuan Pekerjaan (D+E) 7,254,381.86

A.4.1.1.31 Membuat balok beton bertulang (200 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 6.350 100,000.00 635,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.650 120,000.00 198,000.00
Tukang besi L.02 OH 1.400 120,000.00 168,000.00
Kepala tukang L.03 OH 0.333 125,000.00 41,625.00
Mandor L.04 OH 0.318 130,000.00 41,340.00
JUMLAH TENAGA KERJA 1,116,965.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.320 2,476,980.00 792,633.60
Paku kg 3.200 13,887.00 44,438.40
Minyak begesting liter 1.600 8,721.00 13,953.60
Besi beton kg 210.000 9,747.00 2,046,870.00
Bindrad kg 3.000 17,226.00 51,678.00
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
Kayu lapis/ tripleks tb. 3 mm lembar 2.800 50,904.00 142,531.20
Bambu apus batang 16.000 19,485.00 311,760.00
JUMLAH HARGA BAHAN 4,105,552.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 5,222,517.80
E Overhead & Profit (10%) 10% x D 522,251.78
F Harga Satuan Pekerjaan (D+E) 5,744,769.58
A.4.1.1.32 Membuat kolom beton bertulang (150 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 5.300 100,000.00 530,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.300 120,000.00 156,000.00
Tukang besi L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.265 125,000.00 33,125.00
Mandor L.04 OH 0.265 130,000.00 34,450.00
JUMLAH TENAGA KERJA 912,575.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.320 2,476,980.00 792,633.60
Paku kg 3.200 13,887.00 44,438.40
Minyak begesting liter 1.600 8,721.00 13,953.60
Besi beton kg 157.500 9,747.00 1,535,152.50
Bindrad kg 2.250 17,226.00 38,758.50
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
Kayu lapis/ tripleks tb. 3 mm lembar 2.800 50,904.00 142,531.20
Bambu apus batang 32.000 19,485.00 623,520.00
JUMLAH HARGA BAHAN 3,892,675.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,805,250.80
E Overhead & Profit (10%) 10% x D 480,525.08
F Harga Satuan Pekerjaan (D+E) 5,285,775.88

A.4.1.1.33 Membuat dinding beton bertulang (150 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 5.300 100,000.00 530,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.300 120,000.00 156,000.00
Tukang besi L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.262 125,000.00 32,750.00
Mandor L.04 OH 0.265 130,000.00 34,450.00
JUMLAH TENAGA KERJA 912,200.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.240 2,476,980.00 594,475.20
Paku kg 3.200 13,887.00 44,438.40
Minyak begesting liter 1.600 8,721.00 13,953.60
Besi beton kg 157.500 9,747.00 1,535,152.50
Bindrad kg 2.250 17,226.00 38,758.50
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
Kayu lapis/ tripleks tb. 3 mm lembar 2.800 50,904.00 142,531.20
Bambu apus batang 24.000 15,100.00 362,400.00
JUMLAH HARGA BAHAN 3,433,397.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,345,597.40
E Overhead & Profit (10%) 10% x D 434,559.74
F Harga Satuan Pekerjaan (D+E) 4,780,157.14
A.4.1.1.34 Membuat dinding beton bertulang (200 kg besi + bekisting)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 5.650 100,000.00 565,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Tukang kayu L.02 OH 1.560 120,000.00 187,200.00
Tukang besi L.02 OH 1.400 120,000.00 168,000.00
Kepala tukang L.03 OH 0.323 125,000.00 40,375.00
Mandor L.04 OH 0.283 130,000.00 36,790.00
JUMLAH TENAGA KERJA 1,030,365.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.250 2,476,980.00 619,245.00
Paku kg 3.000 13,887.00 41,661.00
Minyak begesting liter 1.200 8,721.00 10,465.20
Besi beton kg 210.000 9,747.00 2,046,870.00
Bindrad kg 3.000 17,226.00 51,678.00
Semen PC. Kg 336.000 1,180.00 396,480.00
Pasir beton per m3 m3 0.540 227,700.00 122,958.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.810 225,000.00 182,250.00
Kayu lapis/ tripleks tb. 3 mm lembar 2.500 50,904.00 127,260.00
Bambu apus batang 14.000 19,485.00 272,790.00
JUMLAH HARGA BAHAN 3,871,657.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,902,022.20
E Overhead & Profit (10%) 10% x D 490,202.22
F Harga Satuan Pekerjaan (D+E) 5,392,224.42

A.4.1.1.35 Membuat kolom praktis beton bertulang (11 x 11) cm

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.180 100,000.00 18,000.00
Tukang batu L.02 OH 0.020 120,000.00 2,400.00
Tukang kayu L.02 OH 0.020 120,000.00 2,400.00
Tukang besi L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.009 130,000.00 1,170.00
JUMLAH TENAGA KERJA 27,120.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.002 2,476,980.00 4,953.96
Paku kg 0.010 13,887.00 138.87
Besi beton kg 3.000 9,747.00 29,241.00
Bindrad kg 0.045 17,226.00 775.17
Semen PC. Kg 4.000 1,180.00 4,720.00
Pasir beton per m3 m3 0.006 227,700.00 1,366.20
Batu pecah 2-3 cm ( pecah mesin) m3 0.009 225,000.00 2,025.00

JUMLAH HARGA BAHAN 43,220.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 70,340.20
E Overhead & Profit (10%) 10% x D 7,034.02
F Harga Satuan Pekerjaan (D+E) 77,374.22
A.4.1.1.36 Membuat ring balok beton bertulang (10 x 15) cm

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.297 100,000.00 29,700.00
Tukang batu L.02 OH 0.033 120,000.00 3,960.00
Tukang kayu L.02 OH 0.033 120,000.00 3,960.00
Tukang besi L.02 OH 0.033 120,000.00 3,960.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 44,780.00
B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.003 2,476,980.00 7,430.94
Paku kg 0.020 13,887.00 277.74
Besi beton kg 3.600 9,747.00 35,089.20
Bindrad kg 0.050 17,226.00 861.30
Semen PC. Kg 5.500 1,180.00 6,490.00
Pasir beton per m3 m3 0.009 227,700.00 2,049.30
Batu pecah 2-3 cm ( pecah mesin) m3 0.015 225,000.00 3,375.00

JUMLAH HARGA BAHAN 55,573.48


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,353.48
E Overhead & Profit (10%) 10% x D 10,035.35
F Harga Satuan Pekerjaan (D+E) 110,388.83
II HARGA SATUAN PEKERJAAN PONDASI

A.3.2.1.1. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 3 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali belah m3 1.200 185,000.00 222,000.00
Semen PC. Kg 202.000 1,180.00 238,360.00
Pasir pasang m3 0.485 195,000.00 94,575.00

JUMLAH HARGA BAHAN 554,935.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 814,060.00
E Overhead & Profit (10%) 10% x D 81,406.00
F Harga Satuan Pekerjaan (D+E) 895,466.00

A.3.2.1.2. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 4 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali belah m3 1.200 185,000.00 222,000.00
Semen PC. Kg 163.000 1,180.00 192,340.00
Pasir pasang m3 0.520 195,000.00 101,400.00

JUMLAH HARGA BAHAN 515,740.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 774,865.00
E Overhead & Profit (10%) 10% x D 77,486.50
F Harga Satuan Pekerjaan (D+E) 852,351.50
A.3.2.1.3. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 5 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali belah m3 1.200 185,000.00 222,000.00
Semen PC. Kg 136.000 1,180.00 160,480.00
Pasir pasang m3 0.544 195,000.00 106,080.00

JUMLAH HARGA BAHAN 488,560.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 747,685.00
E Overhead & Profit (10%) 10% x D 74,768.50
F Harga Satuan Pekerjaan (D+E) 822,453.50

A.3.2.1.4. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 6 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali belah m3 1.200 185,000.00 222,000.00
Semen PC. Kg 117.000 1,180.00 138,060.00
Pasir pasang m3 0.561 195,000.00 109,395.00

JUMLAH HARGA BAHAN 469,455.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 728,580.00
E Overhead & Profit (10%) 10% x D 72,858.00
F Harga Satuan Pekerjaan (D+E) 801,438.00
A.3.2.1.5. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 8 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu kali belah m3 1.200 185,000.00 222,000.00
Semen PC. Kg 91.000 1,180.00 107,380.00
Pasir pasang m3 0.584 195,000.00 113,880.00

JUMLAH HARGA BAHAN 443,260.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 702,385.00
E Overhead & Profit (10%) 10% x D 70,238.50
F Harga Satuan Pekerjaan (D+E) 772,623.50

A.3.2.1.7. Pemasangan 1 m³ pondasi batu belah campuran 1 SP : 3 KP : 10 PP

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 1.500 100,000.00 150,000.00
Tukang batu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.075 125,000.00 9,375.00
Mandor L.04 OH 0.075 130,000.00 9,750.00
JUMLAH TENAGA KERJA 259,125.00
B BAHAN
Batu belah 15-20 cm ( pecah tangan ) m3 1.200 224,937.00 269,924.40
Semen PC. Kg 61.000 1,180.00 71,980.00
Batu Kapur Bongkahan m3 0.147 209,934.00 30,860.30
Pasir pasang m3 0.492 195,000.00 95,940.00
JUMLAH HARGA BAHAN 468,704.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 727,829.70
E Overhead & Profit (10%) 10% x D 72,782.97
F Harga Satuan Pekerjaan (D+E) 800,612.67
A.3.2.1.9. Pemasangan 1 m³ batu kosong (aanstamping)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.780 100,000.00 78,000.00
Tukang batu L.02 OH 0.390 120,000.00 46,800.00
Kepala tukang L.03 OH 0.039 125,000.00 4,875.00
Mandor L.04 OH 0.039 130,000.00 5,070.00
JUMLAH TENAGA KERJA 134,745.00
B BAHAN
Batu belah 15-20 cm ( pecah tangan ) m3 1.200 224,937.00 269,924.40
Pasir urug m3 0.432 127,800.00 55,209.60
JUMLAH HARGA BAHAN 325,134.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 459,879.00
E Overhead & Profit (10%) 10% x D 45,987.90
F Harga Satuan Pekerjaan (D+E) 505,866.90

A.3.2.1.10. Pemasangan 1 m³ pondasi siklop, 60% beton camp 1PC:2PB:3KR

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 3.400 100,000.00 340,000.00
Tukang batu L.02 OH 0.850 120,000.00 102,000.00
Kepala tukang L.03 OH 0.085 125,000.00 10,625.00
Mandor L.04 OH 0.170 130,000.00 22,100.00
JUMLAH TENAGA KERJA 474,725.00
B BAHAN
Batu belah 15-20 cm ( pecah tangan ) m3 0.480 224,937.00 107,969.76
Semen PC. Kg 194.000 1,180.00 228,920.00
Pasir beton per m3 m3 0.312 227,700.00 71,042.40
Batu pecah 2-3 cm ( pecah mesin) m3 0.468 225,000.00 105,300.00
Besi beton kg 126.000 9,747.00
Bindrad kg 1.800 17,226.00
JUMLAH HARGA BAHAN 513,232.16
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 987,957.16
E Overhead & Profit (10%) 10% x D 98,795.72
F Harga Satuan Pekerjaan (D+E) 1,086,752.88
A.3.2.1.11. Pemasangan 1 m³ pondasi sumuran, diameter 100 cm

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 2.400 100,000.00 240,000.00
Tukang batu L.02 OH 0.800 120,000.00 96,000.00
Kepala tukang L.03 OH 0.080 125,000.00 10,000.00
Mandor L.04 OH 0.119 130,000.00 15,470.00
JUMLAH TENAGA KERJA 361,470.00
B BAHAN
Batu belah 15-20 cm ( pecah tangan ) m3 0.450 224,937.00 101,221.65
Semen PC. Kg 194.000 1,180.00 228,920.00
Pasir beton per m3 m3 0.312 227,700.00 71,042.40
Batu pecah 2-3 cm ( pecah mesin) m3 0.468 225,000.00 105,300.00

JUMLAH HARGA BAHAN 506,484.05


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 867,954.05
E Overhead & Profit (10%) 10% x D 86,795.41
F Harga Satuan Pekerjaan (D+E) 954,749.46

A.3.2.1.12. Pemasangan batu bronjong kawat 3mm

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 2.000 100,000.00 200,000.00
Tukang batu L.02 OH 0.400 120,000.00 48,000.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.100 130,000.00 13,000.00
JUMLAH TENAGA KERJA 266,000.00
B BAHAN
Batu belah 15-20 cm ( pecah tangan ) m3 1.200 224,937.00 269,924.40
Baja anyaman bronjong kg 18.000 20,070.00 361,260.00

JUMLAH HARGA BAHAN 631,184.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 897,184.40
E Overhead & Profit (10%) 10% x D 89,718.44
F Harga Satuan Pekerjaan (D+E) 986,902.84
V. HARGA SATUAN PEKERJAAN PASANGAN DINDING

A.4.4.1.2 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 3 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Batu Bata buah 140.000 603.00 84,420.00
Semen PC. Kg 32.950 1,180.00 38,881.00
Pasir pasang m3 0.091 195,000.00 17,745.00

JUMLAH HARGA BAHAN 141,046.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 231,446.00
E Overhead & Profit (10%) 10% x D 23,144.60
F Harga Satuan Pekerjaan (D+E) 254,590.60

A.4.4.1.3 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 4 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Batu Bata buah 140.000 603.00 84,420.00
Semen PC. Kg 26.550 1,180.00 31,329.00
Pasir pasang m3 0.093 195,000.00 18,135.00

JUMLAH HARGA BAHAN 133,884.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 224,284.00
E Overhead & Profit (10%) 10% x D 22,428.40
F Harga Satuan Pekerjaan (D+E) 246,712.40

A.4.4.1.4 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 5 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Batu Bata buah 140.000 603.00 84,420.00
Semen PC. Kg 22.200 1,180.00 26,196.00
Pasir pasang m3 0.102 195,000.00 19,890.00

JUMLAH HARGA BAHAN 130,506.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 220,906.00
E Overhead & Profit (10%) 10% x D 22,090.60
F Harga Satuan Pekerjaan (D+E) 242,996.60

A.4.4.1.5 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 6 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Batu Bata buah 140.000 603.00 84,420.00
Semen PC. Kg 18.500 1,180.00 21,830.00
Pasir pasang m3 0.122 195,000.00 23,790.00

JUMLAH HARGA BAHAN 130,040.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 220,440.00
E Overhead & Profit (10%) 10% x D 22,044.00
F Harga Satuan Pekerjaan (D+E) 242,484.00

A.4.4.1.6 Pemasangan 1 m² dinding bata merah 1 bata, camp 1 PC : 3 KP : 10 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 90,400.00
B BAHAN
Batu Bata buah 140.000 603.00 84,420.00
Semen PC. Kg 10.080 1,180.00 11,894.40
Pasir pasang m3 0.0925 195,000.00 18,037.50
Kawur m3 0.0275 198,000.00 5,445.00
JUMLAH HARGA BAHAN 119,796.90
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 210,196.90
E Overhead & Profit (10%) 10% x D 21,019.69
F Harga Satuan Pekerjaan (D+E) 231,216.59
A.4.4.1.7 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 2 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 18.950 1,180.00 22,361.00
Pasir pasang m3 0.038 195,000.00 7,410.00

JUMLAH HARGA BAHAN 71,981.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 117,181.00
E Overhead & Profit (10%) 10% x D 11,718.10
F Harga Satuan Pekerjaan (D+E) 128,899.10
A.4.4.1.8 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 3 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 14.370 1,180.00 16,956.60
Pasir pasang m3 0.040 195,000.00 7,800.00

JUMLAH HARGA BAHAN 66,966.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 112,166.60
E Overhead & Profit (10%) 10% x D 11,216.66
F Harga Satuan Pekerjaan (D+E) 123,383.26

A.4.4.1.9 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 4 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 11.500 1,180.00 13,570.00
Pasir pasang m3 0.043 195,000.00 8,385.00

JUMLAH HARGA BAHAN 64,165.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 109,365.00
E Overhead & Profit (10%) 10% x D 10,936.50
F Harga Satuan Pekerjaan (D+E) 120,301.50

A.4.4.1.10 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 5 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 9.680 1,180.00 11,422.40
Pasir pasang m3 0.045 195,000.00 8,775.00

JUMLAH HARGA BAHAN 62,407.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 107,607.40
E Overhead & Profit (10%) 10% x D 10,760.74
F Harga Satuan Pekerjaan (D+E) 118,368.14

A.4.4.1.11 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 6 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 8.320 1,180.00 9,817.60
Pasir pasang m3 0.049 195,000.00 9,555.00

JUMLAH HARGA BAHAN 61,582.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,782.60
E Overhead & Profit (10%) 10% x D 10,678.26
F Harga Satuan Pekerjaan (D+E) 117,460.86

A.4.4.1.12 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 8 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 6.500 1,180.00 7,670.00
Pasir pasang m3 0.050 195,000.00 9,750.00

JUMLAH HARGA BAHAN 59,630.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 104,830.00
E Overhead & Profit (10%) 10% x D 10,483.00
F Harga Satuan Pekerjaan (D+E) 115,313.00
A.4.4.1.13 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 3 KP : 10 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 4.500 1,180.00 5,310.00
Pasir pasang m3 0.050 195,000.00 9,750.00
Kawur m3 0.015 198,000.00 2,970.00
JUMLAH HARGA BAHAN 60,240.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 105,440.00
E Overhead & Profit (10%) 10% x D 10,544.00
F Harga Satuan Pekerjaan (D+E) 115,984.00
A.4.4.1.14 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 1 KP : 1 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen warna Kg 0.018 11,700.00 210.60
Pasir pasang m3 0.018 195,000.00 3,510.00
Batu Kapur Bongkahan m3 0.018 209,934.00 3,778.81
JUMLAH HARGA BAHAN 49,709.41
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 94,909.41
E Overhead & Profit (10%) 10% x D 9,490.94
F Harga Satuan Pekerjaan (D+E) 104,400.35

A.4.4.1.15 Pemasangan 1 m² dinding bata merah ½ bata, camp 1 PC : 1 KP : 2 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen warna Kg 0.014 11,700.00 163.80
Pasir pasang m3 0.028 195,000.00 5,460.00
Batu Kapur Bongkahan m3 0.014 209,934.00 2,939.08
JUMLAH HARGA BAHAN 50,772.88
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 95,972.88
E Overhead & Profit (10%) 10% x D 9,597.29
F Harga Satuan Pekerjaan (D+E) 105,570.16

A.4.4.1.22 Pemasangan dinding terawang (roster) 12 x 11 x 24 cm, camp 1 PC : 3 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Roster beton 12x11x24 buah 30.000 6,831.00 204,930.00
Semen PC. Kg 14.000 1,180.00 16,520.00
Pasir pasang m3 0.035 195,000.00 6,825.00

JUMLAH HARGA BAHAN 228,275.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 273,475.00
E Overhead & Profit (10%) 10% x D 27,347.50
F Harga Satuan Pekerjaan (D+E) 300,822.50
A.4.4.1.23 Pemasangan dinding terawang (roster) 12 x 11 x 24 cm, campuran 1 PC : 4 PP

Harga Satuan Jumlah Harga


No URAIAN Kode Satuan Koefisien
(Rp) (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Roster beton 12x11x24 buah 30.000 6,831.00 204,930.00
Semen PC. Kg 11.000 1,180.00 12,980.00
Pasir pasang m3 0.035 195,000.00 6,825.00

JUMLAH HARGA BAHAN 224,735.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 269,935.00
E Overhead & Profit (10%) 10% x D 26,993.50
F Harga Satuan Pekerjaan (D+E) 296,928.50
VI HARGA SATUAN PEKERJAAN PLESTERAN

A.4.4.2.1 Pemasangan plesteran 1 PC : 1 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 15.504 1,180.00 18,294.72
Pasir pasang m3 0.016 195,000.00 3,120.00

JUMLAH HARGA BAHAN 21,414.72


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 73,239.72
E Overhead & Profit (10%) 10% x D 7,323.97
F Harga Satuan Pekerjaan (D+E) 80,563.69

A.4.4.2.2 Pemasangan plesteran 1 PC : 2 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 10.224 1,180.00 12,064.32
Pasir pasang m3 0.020 195,000.00 3,900.00

JUMLAH HARGA BAHAN 15,964.32


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,789.32
E Overhead & Profit (10%) 10% x D 6,778.93
F Harga Satuan Pekerjaan (D+E) 74,568.25

A.4.4.2.3 Pemasangan plesteran 1 PC : 3 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 7.776 1,180.00 9,175.68
Pasir pasang m3 0.023 195,000.00 4,485.00

JUMLAH HARGA BAHAN 13,660.68


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,485.68
E Overhead & Profit (10%) 10% x D 6,548.57
F Harga Satuan Pekerjaan (D+E) 72,034.25

A.4.4.2.4 Pemasangan plesteran 1 PC : 4 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 6.240 1,180.00 7,363.20
Pasir pasang m3 0.024 195,000.00 4,680.00

JUMLAH HARGA BAHAN 12,043.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 63,868.20
E Overhead & Profit (10%) 10% x D 6,386.82
F Harga Satuan Pekerjaan (D+E) 70,255.02

A.4.4.2.6 Pemasangan plesteran 1 PC : 6 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 4.416 1,180.00 5,210.88
Pasir pasang m3 0.027 195,000.00 5,265.00

JUMLAH HARGA BAHAN 10,475.88


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 62,300.88
E Overhead & Profit (10%) 10% x D 6,230.09
F Harga Satuan Pekerjaan (D+E) 68,530.97
A.4.4.2.8 Pemasangan plesteran 1 PC : 8 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 3.456 1,180.00 4,078.08
Pasir pasang m3 0.029 195,000.00 5,655.00

JUMLAH HARGA BAHAN 9,733.08


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 61,558.08
E Overhead & Profit (10%) 10% x D 6,155.81
F Harga Satuan Pekerjaan (D+E) 67,713.89
A.4.4.2.9 Pemasangan plesteran 1 PC : ½ KP : 3 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.360 100,000.00 36,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 54,240.00
B BAHAN
Semen PC. Kg 5.760 1,180.00 6,796.80
Batu Kapur Bongkahan m3 0.003 209,934.00 629.80
Pasir pasang m3 0.013 195,000.00 2,535.00

JUMLAH HARGA BAHAN 9,961.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 64,201.60
E Overhead & Profit (10%) 10% x D 6,420.16
F Harga Satuan Pekerjaan (D+E) 70,621.76

A.4.4.2.10 Pemasangan plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.360 100,000.00 36,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 54,240.00
B BAHAN
Semen PC. Kg 3.000 1,180.00 3,540.00
Batu Kapur Bongkahan m3 0.005 209,934.00 1,049.67
Pasir pasang m3 0.020 195,000.00 3,900.00

JUMLAH HARGA BAHAN 8,489.67


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 62,729.67
E Overhead & Profit (10%) 10% x D 6,272.97
F Harga Satuan Pekerjaan (D+E) 69,002.64

A.4.4.2.11 Pemasangan plesteran 1 PC : 1 KP : 1 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.360 100,000.00 36,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 54,240.00
B BAHAN
Semen PC. Kg 0.009 1,180.00 10.62
Batu Kapur Bongkahan m3 0.009 209,934.00 1,889.41
Pasir pasang m3 0.009 195,000.00 1,755.00

JUMLAH HARGA BAHAN 3,655.03


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 57,895.03
E Overhead & Profit (10%) 10% x D 5,789.50
F Harga Satuan Pekerjaan (D+E) 63,684.53
A.4.4.2.12 Pemasangan plesteran 1 PC : 1 KP : 2 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.360 100,000.00 36,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 54,240.00
B BAHAN
Semen PC. Kg 0.007 1,180.00 8.26
Batu Kapur Bongkahan m3 0.007 209,934.00 1,469.54
Pasir pasang m3 0.015 195,000.00 2,925.00

JUMLAH HARGA BAHAN 4,402.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 58,642.80
E Overhead & Profit (10%) 10% x D 5,864.28
F Harga Satuan Pekerjaan (D+E) 64,507.08

A.4.4.2.13 Pemasangan plesteran 1 PC : 1 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 69,360.00
B BAHAN
Semen PC. Kg 13.632 1,180.00 16,085.76
Pasir pasang m3 0.027 195,000.00 5,265.00

JUMLAH HARGA BAHAN 21,350.76


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,710.76
E Overhead & Profit (10%) 10% x D 9,071.08
F Harga Satuan Pekerjaan (D+E) 99,781.84

A.4.4.2.14 Pemasangan plesteran 1 PC : 3 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 69,360.00
B BAHAN
Semen PC. Kg 10.368 1,180.00 12,234.24
Pasir pasang m3 0.031 195,000.00 6,045.00

JUMLAH HARGA BAHAN 18,279.24


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,639.24
E Overhead & Profit (10%) 10% x D 8,763.92
F Harga Satuan Pekerjaan (D+E) 96,403.16
A.4.4.2.15 Pemasangan plesteran 1 PC : 4 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 69,360.00
B BAHAN
Semen PC. Kg 8.320 1,180.00 9,817.60
Pasir pasang m3 0.032 195,000.00 6,240.00

JUMLAH HARGA BAHAN 16,057.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 85,417.60
E Overhead & Profit (10%) 10% x D 8,541.76
F Harga Satuan Pekerjaan (D+E) 93,959.36

A.4.4.2.16 Pemasangan plesteran 1 PC : 5 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 69,360.00
B BAHAN
Semen PC. Kg 6.912 1,180.00 8,156.16
Pasir pasang m3 0.035 195,000.00 6,825.00

JUMLAH HARGA BAHAN 14,981.16


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 84,341.16
E Overhead & Profit (10%) 10% x D 8,434.12
F Harga Satuan Pekerjaan (D+E) 92,775.28

A.4.4.2.17 Pemasangan plesteran 1 PC : 6 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang batu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 69,360.00
B BAHAN
Semen PC. Kg 5.888 1,180.00 6,947.84
Pasir pasang m3 0.036 195,000.00 7,020.00

JUMLAH HARGA BAHAN 13,967.84


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 83,327.84
E Overhead & Profit (10%) 10% x D 8,332.78
F Harga Satuan Pekerjaan (D+E) 91,660.62
A.4.4.2.18 Pemasangan plesteran 1 PC : 1 KP : 2 PP, tebal 20 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.440 100,000.00 44,000.00
Tukang batu L.02 OH 0.220 120,000.00 26,400.00
Kepala tukang L.03 OH 0.022 125,000.00 2,750.00
Mandor L.04 OH 0.022 130,000.00 2,860.00
JUMLAH TENAGA KERJA 76,010.00
B BAHAN
Semen PC. Kg 0.009 1,180.00 10.62
Kawur m3 0.009 198,000.00 1,782.00
Pasir pasang m3 0.018 195,000.00 3,510.00
JUMLAH HARGA BAHAN 5,302.62
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 81,312.62
E Overhead & Profit (10%) 10% x D 8,131.26
F Harga Satuan Pekerjaan (D+E) 89,443.88

A.4.4.2.19 Pemasangan berapen 1 PC : 1 PP, tebal 15 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang batu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 26,040.00
B BAHAN
Semen PC. Kg 5.184 1,180.00 6,117.12
Pasir pasang m3 0.026 195,000.00 5,070.00

JUMLAH HARGA BAHAN 11,187.12


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 37,227.12
E Overhead & Profit (10%) 10% x D 3,722.71
F Harga Satuan Pekerjaan (D+E) 40,949.83

Dihitung Pemasangan plesteran skoning 1 PC : 3 PP, lebar 10 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00
JUMLAH TENAGA KERJA 15,380.00
B BAHAN
Semen PC. Kg 0.500 1,180.00 590.00
Pasir pasang m3 0.013 195,000.00 2,535.00

JUMLAH HARGA BAHAN 3,125.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,505.00
E Overhead & Profit (10%) 10% x D 1,850.50
F Harga Satuan Pekerjaan (D+E) 20,355.50
A.4.4.2.23 Pemasangan plesteran ciprat 1 PC : 2 PP

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 45,200.00
B BAHAN
Semen PC. Kg 4.320 1,180.00 5,097.60
Pasir pasang m3 0.006 195,000.00 1,170.00

JUMLAH HARGA BAHAN 6,267.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,467.60
E Overhead & Profit (10%) 10% x D 5,146.76
F Harga Satuan Pekerjaan (D+E) 56,614.36

A.4.4.2.24 Pemasangan Finishing siar pasangan bata merah

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang batu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 26,040.00
B BAHAN
Semen PC. Kg 3.108 1,180.00 3,667.44

JUMLAH HARGA BAHAN 3,667.44


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,707.44
E Overhead & Profit (10%) 10% x D 2,970.74
F Harga Satuan Pekerjaan (D+E) 32,678.18

A.4.4.2.25 Pemasangan Finishing siar pasangan conblock ekspose

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.070 100,000.00 7,000.00
Tukang batu L.02 OH 0.035 120,000.00 4,200.00
Kepala tukang L.03 OH 0.004 125,000.00 500.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 12,220.00
B BAHAN
Semen PC. Kg 1.600 1,180.00 1,888.00

JUMLAH HARGA BAHAN 1,888.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 14,108.00
E Overhead & Profit (10%) 10% x D 1,410.80
F Harga Satuan Pekerjaan (D+E) 15,518.80
A.4.4.2.26 Pemasangan Finishing siar pasangan batu kali camp 1 PC : 2 PP

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.300 100,000.00 30,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 51,825.00
B BAHAN
Semen PC. Kg 6.340 1,180.00 7,481.20
Pasir pasang m3 0.012 195,000.00 2,340.00

JUMLAH HARGA BAHAN 9,821.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 61,646.20
E Overhead & Profit (10%) 10% x D 6,164.62
F Harga Satuan Pekerjaan (D+E) 67,810.82

A.4.4.2.27 Pemasangan acian

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.010 130,000.00 1,300.00
JUMLAH TENAGA KERJA 34,550.00
B BAHAN
Semen PC. Kg 3.250 1,180.00 3,835.00

JUMLAH HARGA BAHAN 3,835.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,385.00
E Overhead & Profit (10%) 10% x D 3,838.50
F Harga Satuan Pekerjaan (D+E) 42,223.50
VII HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING

A.4.4.3.9 Pemasangan lantai ubin granit ukuran (40 x 40) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.125 120,000.00 15,000.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 43,315.00
B BAHAN
Tegel granit 40 x 40 cm buah 6.630 15,849.00 105,078.87
Semen PC. Kg 9.800 1,180.00 11,564.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.300 11,700.00 15,210.00
JUMLAH HARGA BAHAN 140,627.87
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 183,942.87
E Overhead & Profit (10%) 10% x D 18,394.29
F Harga Satuan Pekerjaan (D+E) 202,337.16

A.4.4.3.10 Pemasangan lantai ubin granit ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.260 100,000.00 26,000.00
Tukang batu L.02 OH 0.130 120,000.00 15,600.00
Kepala tukang L.03 OH 0.013 125,000.00 1,625.00
Mandor L.04 OH 0.013 130,000.00 1,690.00
JUMLAH TENAGA KERJA 44,915.00
B BAHAN
Tegel granit 30 x 30 cm buah 11.870 6,903.00 81,938.61
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 120,063.61
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 164,978.61
E Overhead & Profit (10%) 10% x D 16,497.86
F Harga Satuan Pekerjaan (D+E) 181,476.47

A.4.4.3.9.1 Pemasangan lantai keramik ukuran (40 x 40) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 40 x 40 cm kelas I buah 6.630 10,989.00 72,857.07
Semen PC. Kg 8.000 1,180.00 9,440.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 108,622.07
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 229,547.07
E Overhead & Profit (10%) 10% x D 22,954.71
F Harga Satuan Pekerjaan (D+E) 252,501.78
A.4.4.3.9.2 Pemasangan lantai keramik ukuran (40 x 40) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 40 x 40 cm kelas II buah 6.630 9,090.00 60,266.70
Semen PC. Kg 8.000 1,180.00 9,440.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00

JUMLAH HARGA BAHAN 96,031.70


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 216,956.70
E Overhead & Profit (10%) 10% x D 21,695.67
F Harga Satuan Pekerjaan (D+E) 238,652.37

A.4.4.3.13.1 Pemasangan lantai keramik ukuran (60 x 60) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.240 100,000.00 24,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.012 130,000.00 1,560.00
JUMLAH TENAGA KERJA 41,460.00
B BAHAN
Keramik lantai 60 x 60 cm kelas I buah 3.100 36,261.00 112,409.10
Semen PC. Kg 9.600 1,180.00 11,328.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00

JUMLAH HARGA BAHAN 150,062.10


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 191,522.10
E Overhead & Profit (10%) 10% x D 19,152.21
F Harga Satuan Pekerjaan (D+E) 210,674.31

A.4.4.3.13.2 Pemasangan lantai keramik ukuran (60 x 60) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.240 100,000.00 24,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.012 130,000.00 1,560.00
JUMLAH TENAGA KERJA 41,460.00
B BAHAN
Keramik lantai 60 x 60 cm kelas II buah 3.100 34,722.00 107,638.20
Semen PC. Kg 9.600 1,180.00 11,328.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00

JUMLAH HARGA BAHAN 145,291.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 186,751.20
E Overhead & Profit (10%) 10% x D 18,675.12
F Harga Satuan Pekerjaan (D+E) 205,426.32
A.4.4.3.35 Pemasangan lantai keramik ukuran (30 x 30) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 30 x 30 cm kelas I buah 11.870 5,760.00 68,371.20
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 106,496.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 227,421.20
E Overhead & Profit (10%) 10% x D 22,742.12
F Harga Satuan Pekerjaan (D+E) 250,163.32

A.4.4.3.35.1 Pemasangan lantai keramik ukuran (30 x 30) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 30 x 30 cm kelas II buah 11.870 4,500.00 53,415.00
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 91,540.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 212,465.00
E Overhead & Profit (10%) 10% x D 21,246.50
F Harga Satuan Pekerjaan (D+E) 233,711.50

A.4.4.3.36 Pemasangan lantai keramik ukuran (20 x 20) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 20 x 20 cm kelas I buah 26.500 2,079.00 55,093.50
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 95,094.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 216,019.50
E Overhead & Profit (10%) 10% x D 21,601.95
F Harga Satuan Pekerjaan (D+E) 237,621.45
A.4.4.3.36.1 Pemasangan lantai keramik ukuran (20 x 20) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Keramik lantai 20 x 20 cm kelas II buah 26.500 2,079.00 55,093.50
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 95,094.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 216,019.50
E Overhead & Profit (10%) 10% x D 21,601.95
F Harga Satuan Pekerjaan (D+E) 237,621.45

A.4.4.3.39 Pemasangan plint keramik ukuran (10 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.090 100,000.00 9,000.00
Tukang batu L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 24,825.00
B BAHAN
Keramik plin 10 x 20 cm kelas I buah 5.300 2,178.00 11,543.40
Semen PC. Kg 1.140 1,180.00 1,345.20
Pasir pasang m3 0.003 195,000.00 585.00
Semen warna Kg 0.025 11,700.00 292.50
JUMLAH HARGA BAHAN 13,766.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,591.10
E Overhead & Profit (10%) 10% x D 3,859.11
F Harga Satuan Pekerjaan (D+E) 42,450.21

A.4.4.3.46 Pemasangan lantai parquet kayu

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang kayu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Parquet kayu m2 1.050 79,623.00 83,604.15
Lem kg 0.600 26,541.00 15,924.60

JUMLAH HARGA BAHAN 99,528.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 220,453.75
E Overhead & Profit (10%) 10% x D 22,045.38
F Harga Satuan Pekerjaan (D+E) 242,499.13
A.4.4.3.47 Pemasangan lantai kayu (gymfloor)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang kayu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Lantai kayu (gymfloor) m2 1.050 99,477.00 104,450.85
Lem kg 0.600 26,541.00 15,924.60

JUMLAH HARGA BAHAN 120,375.45


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 241,300.45
E Overhead & Profit (10%) 10% x D 24,130.05
F Harga Satuan Pekerjaan (D+E) 265,430.50

A.4.4.3.51 Pemasangan dinding keramik artistik ukuran (10 x 20) cm klas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding artistik 10 x 20 cm kelas I buah 53.000 9,540.00 505,620.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00
JUMLAH HARGA BAHAN 552,279.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 707,754.00
E Overhead & Profit (10%) 10% x D 70,775.40
F Harga Satuan Pekerjaan (D+E) 778,529.40

A.4.4.3.51.1 Pemasangan dinding keramik artistik ukuran (10 x 20) cm klas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding artistik 10 x 20 cm kelas II buah 53.000 5,715.00 302,895.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00
JUMLAH HARGA BAHAN 349,554.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 505,029.00
E Overhead & Profit (10%) 10% x D 50,502.90
F Harga Satuan Pekerjaan (D+E) 555,531.90
A.4.4.3.52 Pemasangan dinding keramik artistik ukuran (7 x 20) cm Klas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding artistik 7 x 20 cm kelas I buah 106.000 6,669.00 706,914.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.900 11,700.00 33,930.00
JUMLAH HARGA BAHAN 755,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 910,803.00
E Overhead & Profit (10%) 10% x D 91,080.30
F Harga Satuan Pekerjaan (D+E) 1,001,883.30

A.4.4.3.52.1 Pemasangan dinding keramik artistik ukuran (7 x 20) cm Klas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding artistik 7 x 20 cm kelas I buah 106.000 6,669.00 706,914.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.900 11,700.00 33,930.00
JUMLAH HARGA BAHAN 755,328.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 910,803.00
E Overhead & Profit (10%) 10% x D 91,080.30
F Harga Satuan Pekerjaan (D+E) 1,001,883.30

A.4.4.3.53 Pemasangan dinding keramik ukuran (10 x 20) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 10 x 20 cm kelas I buah 53.000 1,359.00 72,027.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00
JUMLAH HARGA BAHAN 118,686.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 274,161.00
E Overhead & Profit (10%) 10% x D 27,416.10
F Harga Satuan Pekerjaan (D+E) 301,577.10

A.4.4.3.53.1 Pemasangan dinding keramik ukuran (10 x 20) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 10 x 20 cm kelas II buah 53.000 1,089.00 57,717.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00
JUMLAH HARGA BAHAN 104,376.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 259,851.00
E Overhead & Profit (10%) 10% x D 25,985.10
F Harga Satuan Pekerjaan (D+E) 285,836.10

A.4.4.3.54 Pemasangan dinding keramik ukuran (20 x 20) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 20 x 20 cm kelas I buah 26.500 2,763.00 73,219.50
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 1.940 11,700.00 22,698.00
JUMLAH HARGA BAHAN 110,401.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 265,876.50
E Overhead & Profit (10%) 10% x D 26,587.65
F Harga Satuan Pekerjaan (D+E) 292,464.15

A.4.4.3.54.1 Pemasangan dinding keramik ukuran (20 x 20) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 20 x 20 cm kelas II buah 26.500 2,079.00 55,093.50
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 1.940 11,700.00 22,698.00
JUMLAH HARGA BAHAN 92,275.50
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 247,750.50
E Overhead & Profit (10%) 10% x D 24,775.05
F Harga Satuan Pekerjaan (D+E) 272,525.55

A.4.4.3.55 Pemasangan dinding marmer ukuran (100 x 100) cm Klas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.300 100,000.00 130,000.00
Tukang batu L.02 OH 0.650 120,000.00 78,000.00
Kepala tukang L.03 OH 0.065 125,000.00 8,125.00
Mandor L.04 OH 0.065 130,000.00 8,450.00
JUMLAH TENAGA KERJA 224,575.00
B BAHAN
Keramik dinding marmer 100 x 100 cm kelas I buah 1.060 155,106.00 164,412.36
Paku kg 3.030 13,887.00 42,077.61
Semen PC. Kg 12.440 1,180.00 14,679.20
Pasir pasang m3 0.025 195,000.00 4,875.00
Semen warna Kg 0.650 11,700.00 7,605.00
JUMLAH HARGA BAHAN 233,649.17
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 458,224.17
E Overhead & Profit (10%) 10% x D 45,822.42
F Harga Satuan Pekerjaan (D+E) 504,046.59

A.4.4.3.55.1 Pemasangan dinding marmer ukuran (100 x 100) cm Klas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 1.300 100,000.00 130,000.00
Tukang batu L.02 OH 0.650 120,000.00 78,000.00
Kepala tukang L.03 OH 0.065 125,000.00 8,125.00
Mandor L.04 OH 0.065 130,000.00 8,450.00
JUMLAH TENAGA KERJA 224,575.00
B BAHAN
Keramik dinding marmer 100 x 100 cm kelas II buah 1.060 116,352.00 123,333.12
Paku kg 3.030 13,887.00 42,077.61
Semen PC. Kg 12.440 1,180.00 14,679.20
Pasir pasang m3 0.025 195,000.00 4,875.00
Semen warna Kg 0.650 11,700.00 7,605.00
JUMLAH HARGA BAHAN 192,569.93
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 417,144.93
E Overhead & Profit (10%) 10% x D 41,714.49
F Harga Satuan Pekerjaan (D+E) 458,859.42

A.4.4.3.57 Pemasangan dinding batu paras

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/palimanan/paras m2 1.100 104,490.00 114,939.00
Semen PC. Kg 11.750 1,180.00 13,865.00
Pasir pasang m3 0.035 195,000.00 6,825.00
JUMLAH HARGA BAHAN 135,629.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 256,554.00
E Overhead & Profit (10%) 10% x D 25,655.40
F Harga Satuan Pekerjaan (D+E) 282,209.40

A.4.4.3.58 Pemasangan dinding batu tempel hitam

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel hitam/candi m2 1.100 106,533.00 117,186.30
Semen PC. Kg 11.750 1,180.00 13,865.00
Pasir pasang m3 0.035 195,000.00 6,825.00
JUMLAH HARGA BAHAN 137,876.30
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,801.30
E Overhead & Profit (10%) 10% x D 25,880.13
F Harga Satuan Pekerjaan (D+E) 284,681.43

A.4.4.3.59 Pemasangan lantai vynil ukuran 30 x 30 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 35,915.00
B BAHAN
Lantai vinyl karet buah 11.870 9,540.00 113,239.80
Lem Vinyl kg 0.350 18,900.00 6,615.00

JUMLAH HARGA BAHAN 119,854.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 155,769.80
E Overhead & Profit (10%) 10% x D 15,576.98
F Harga Satuan Pekerjaan (D+E) 171,346.78

A.4.4.3.60 Pemasangan wallpaper lebar 50 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang batu L.02 OH 0.175 120,000.00 21,000.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 58,385.00
B BAHAN
Wallpaper 50 cm m' 2.200 63,630.00 139,986.00
Lem kg 0.250 26,541.00 6,635.25

JUMLAH HARGA BAHAN 146,621.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 205,006.25
E Overhead & Profit (10%) 10% x D 20,500.63
F Harga Satuan Pekerjaan (D+E) 225,506.88

A.4.4.3.61 Pemasangan floor harderner


No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.120 100,000.00 12,000.00
Tukang batu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 28,680.00
B BAHAN
Floor hardener kg 5.000 1,998.00 9,990.00

JUMLAH HARGA BAHAN 9,990.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,670.00
E Overhead & Profit (10%) 10% x D 3,867.00
F Harga Satuan Pekerjaan (D+E) 42,537.00

A.4.4.3.62.1 Pemasangan plint vynil 30x30

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.080 100,000.00 8,000.00
Tukang batu L.02 OH 0.080 120,000.00 9,600.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.004 130,000.00 520.00
JUMLAH TENAGA KERJA 19,120.00
B BAHAN
Vinyl 30 x 30 buah 1.760 2,808.00 4,942.08
Lem kg 0.080 26,541.00 2,123.28

JUMLAH HARGA BAHAN 7,065.36


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 26,185.36
E Overhead & Profit (10%) 10% x D 2,618.54
F Harga Satuan Pekerjaan (D+E) 28,803.90

Dihitung Pemasangan dinding keramik ukuran (20 x 25) cm kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 20 x 25 cm kelas I buah 21.000 2,988.00 62,748.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 1.940 11,700.00 22,698.00

JUMLAH HARGA BAHAN 99,930.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 255,405.00
E Overhead & Profit (10%) 10% x D 25,540.50
F Harga Satuan Pekerjaan (D+E) 280,945.50

Dihitung Pemasangan dinding keramik ukuran (20 x 25) cm kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Keramik dinding 20 x 25 cm kelas II buah 21.000 2,538.00 53,298.00
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 1.940 11,700.00 22,698.00

JUMLAH HARGA BAHAN 90,480.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 245,955.00
E Overhead & Profit (10%) 10% x D 24,595.50
F Harga Satuan Pekerjaan (D+E) 270,550.50

Dihitung Pemasangan lantai andesit ukuran (40 x 40) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu andesit (hitam,abu-abu,hijau) 40x40 cm bh 6.630 29,157.12 193,311.71
Semen PC. Kg 8.000 1,180.00 9,440.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00

JUMLAH HARGA BAHAN 229,076.71


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 350,001.71
E Overhead & Profit (10%) 10% x D 35,000.17
F Harga Satuan Pekerjaan (D+E) 385,001.88
Dihitung Pemasangan lantai andesit ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu andesit (hitam,abu-abu,hijau) 30x30 cm bh 11.870 13,750.56 163,219.15
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00

JUMLAH HARGA BAHAN 201,344.15


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 322,269.15
E Overhead & Profit (10%) 10% x D 32,226.91
F Harga Satuan Pekerjaan (D+E) 354,496.06

Dihitung Pemasangan lantai andesit ukuran (20 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu andesit (hitam,abu-abu,hijau) 20x20 cm bh 26.500 5,849.28 155,005.92
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00

JUMLAH HARGA BAHAN 195,006.92


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 315,931.92
E Overhead & Profit (10%) 10% x D 31,593.19
F Harga Satuan Pekerjaan (D+E) 347,525.11

Dihitung Pemasangan lantai sandstone ukuran (40 x 40) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Sandstone rata mesin (putih) 40x40 cm bh 6.630 18,172.80 120,485.66
Semen PC. Kg 8.000 1,180.00 9,440.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 156,250.66
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 277,175.66
E Overhead & Profit (10%) 10% x D 27,717.57
F Harga Satuan Pekerjaan (D+E) 304,893.23

Dihitung Pemasangan lantai sandstone ukuran (20 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Sandstone rata mesin (putih) 20x20 cm bh 26.500 3,999.60 105,989.40
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 145,990.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 266,915.40
E Overhead & Profit (10%) 10% x D 26,691.54
F Harga Satuan Pekerjaan (D+E) 293,606.94

Dihitung Pemasangan lantai salagedang ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/templek Salagedang 30x30 cm bh 11.870 11,453.40 135,951.86
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 174,076.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 295,001.86
E Overhead & Profit (10%) 10% x D 29,500.19
F Harga Satuan Pekerjaan (D+E) 324,502.04

Dihitung Pemasangan lantai salagedang ukuran (20 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/templek Salagedang 20x20cm bh 26.500 4,130.28 109,452.42
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 149,453.42
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 270,378.42
E Overhead & Profit (10%) 10% x D 27,037.84
F Harga Satuan Pekerjaan (D+E) 297,416.26

Dihitung Pemasangan lantai salagedang acak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/templek Salagedang Acak m2 1.100 86,022.00 94,624.20
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00

JUMLAH HARGA BAHAN 134,625.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 255,550.20
E Overhead & Profit (10%) 10% x D 25,555.02
F Harga Satuan Pekerjaan (D+E) 281,105.22

Dihitung Pemasangan dinding salagedang acak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Batu tempel/templek Salagedang Acak m2 1.100 86,022.00 94,624.20
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00

JUMLAH HARGA BAHAN 141,283.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 296,758.20
E Overhead & Profit (10%) 10% x D 29,675.82
F Harga Satuan Pekerjaan (D+E) 326,434.02

Dihitung Pemasangan lantai batu tempel purwakarta ukuran (20 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/templek Purwokarta 20 x 20 cm bh 26.500 4,543.20 120,394.80
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 160,395.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 281,320.80
E Overhead & Profit (10%) 10% x D 28,132.08
F Harga Satuan Pekerjaan (D+E) 309,452.88

Dihitung Pemasangan lantai batu tempel purwakarta acak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu tempel/templek Purwokarta acak m2 1.100 89,514.00 98,465.40
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 138,466.40
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 259,391.40
E Overhead & Profit (10%) 10% x D 25,939.14
F Harga Satuan Pekerjaan (D+E) 285,330.54

Dihitung Pemasangan dinding batu tempel purwakarta acak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Batu tempel/templek Purwokarta acak m2 1.100 89,514.00 98,465.40
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00

JUMLAH HARGA BAHAN 145,124.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 300,599.40
E Overhead & Profit (10%) 10% x D 30,059.94
F Harga Satuan Pekerjaan (D+E) 330,659.34

Dihitung Pemasangan lantai batu palimanan ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu palimanan 30x30 cm bh 11.870 10,635.30 126,241.01
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 164,366.01
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 285,291.01
E Overhead & Profit (10%) 10% x D 28,529.10
F Harga Satuan Pekerjaan (D+E) 313,820.11

Dihitung Pemasangan lantai batu palimanan ukuran (20 x 20) cm


No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu palimanan 20x20 cm bh 26.500 4,363.20 115,624.80
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 155,625.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 276,550.80
E Overhead & Profit (10%) 10% x D 27,655.08
F Harga Satuan Pekerjaan (D+E) 304,205.88

Dihitung Pemasangan dinding batu palimanan ukuran (10 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Batu palimanan 10x20 cm bh 53.000 1,999.80 105,989.40
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00

JUMLAH HARGA BAHAN 152,648.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 308,123.40
E Overhead & Profit (10%) 10% x D 30,812.34
F Harga Satuan Pekerjaan (D+E) 338,935.74

Dihitung Pemasangan lantai batu candi ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu candi 30x30 cm bh 11.870 9,267.21 110,001.78
Semen PC. Kg 10.000 1,180.00 11,800.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.500 11,700.00 17,550.00
JUMLAH HARGA BAHAN 148,126.78
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 269,051.78
E Overhead & Profit (10%) 10% x D 26,905.18
F Harga Satuan Pekerjaan (D+E) 295,956.96

Dihitung Pemasangan lantai batu candi ukuran (20 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.700 100,000.00 70,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.035 130,000.00 4,550.00
JUMLAH TENAGA KERJA 120,925.00
B BAHAN
Batu palimanan 20x20 cm bh 26.500 4,363.20 115,624.80
Semen PC. Kg 10.400 1,180.00 12,272.00
Pasir pasang m3 0.045 195,000.00 8,775.00
Semen warna Kg 1.620 11,700.00 18,954.00
JUMLAH HARGA BAHAN 155,625.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 276,550.80
E Overhead & Profit (10%) 10% x D 27,655.08
F Harga Satuan Pekerjaan (D+E) 304,205.88

Dihitung Pemasangan dinding batu candi ukuran (10 x 20) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.900 100,000.00 90,000.00
Tukang batu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.045 130,000.00 5,850.00
JUMLAH TENAGA KERJA 155,475.00
B BAHAN
Batu candi 10x20 cm bh 53.000 1,527.12 80,937.36
Semen PC. Kg 9.300 1,180.00 10,974.00
Pasir pasang m3 0.018 195,000.00 3,510.00
Semen warna Kg 2.750 11,700.00 32,175.00

JUMLAH HARGA BAHAN 127,596.36


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 283,071.36
E Overhead & Profit (10%) 10% x D 28,307.14
F Harga Satuan Pekerjaan (D+E) 311,378.50

Dihitung Pemasangan paving I, tebal 6 cm, K175

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving I, tb 6 cm K 175 m2 1.010 58,176.00 58,757.76
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 78,257.76


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 172,757.76
E Overhead & Profit (10%) 10% x D 17,275.78
F Harga Satuan Pekerjaan (D+E) 190,033.54

Dihitung Pemasangan paving I, tebal 8 cm, K225

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving I, tb 8 cm K 225 m2 1.010 77,517.00 78,292.17
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 97,792.17


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 192,292.17
E Overhead & Profit (10%) 10% x D 19,229.22
F Harga Satuan Pekerjaan (D+E) 211,521.39
Dihitung Pemasangan paving I, tebal 8 cm, K250

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving I, tb 8 cm K 250 m2 1.010 82,674.00 83,500.74
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 103,000.74


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 197,500.74
E Overhead & Profit (10%) 10% x D 19,750.07
F Harga Satuan Pekerjaan (D+E) 217,250.81

Dihitung Pemasangan paving I, tebal 8 cm, K300

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving I, tb 8 cm K 300 m2 1.010 88,128.00 89,009.28
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 108,509.28


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 203,009.28
E Overhead & Profit (10%) 10% x D 20,300.93
F Harga Satuan Pekerjaan (D+E) 223,310.21

Dihitung Pemasangan paving segienam, tebal 5 cm, K175

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving segi enam, tb 6 cm K 175 m2 1.010 53,154.00 53,685.54
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 73,185.54


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 167,685.54
E Overhead & Profit (10%) 10% x D 16,768.55
F Harga Satuan Pekerjaan (D+E) 184,454.09
Dihitung Pemasangan paving segienam warna, tebal 5 cm, K175

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving segi enam, warna tb 6 cm K 175 m2 1.010 58,608.00 59,194.08
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 78,694.08


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 173,194.08
E Overhead & Profit (10%) 10% x D 17,319.41
F Harga Satuan Pekerjaan (D+E) 190,513.49

Dihitung Pemasangan paving segienam warna, tebal 7 cm, K200

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang batu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00
JUMLAH TENAGA KERJA 94,500.00
B BAHAN
Tegel paving kawung, warna tb 6 cm K 175 m2 1.010 62,604.00 63,230.04
Pasir pasang m3 0.100 195,000.00 19,500.00

JUMLAH HARGA BAHAN 82,730.04


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,230.04
E Overhead & Profit (10%) 10% x D 17,723.00
F Harga Satuan Pekerjaan (D+E) 194,953.04
IV HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM

A.4.2.1.1 Pemasangan 1 kg besi profil

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA kg
Pekerja L.01 OH 0.060 100,000.00 6,000.00
Tukang las L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 14,340.00


B BAHAN
Besi profil kg 1.150 13,815.00 15,887.25

JUMLAH HARGA BAHAN 15,887.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,227.25
E Overhead & Profit (10%) 10% x D 3,022.73
F Harga Satuan Pekerjaan (D+E) 33,249.98

A.4.2.1.2 Pemasangan 1 kg rangka kuda-kuda baja IWF

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA kg
Pekerja L.01 OH 0.060 100,000.00 6,000.00
Tukang las L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 14,340.00


B BAHAN
Besi IWF kg 1.150 15,849.00 18,226.35

JUMLAH HARGA BAHAN 18,226.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,566.35
E Overhead & Profit (10%) 10% x D 3,256.64
F Harga Satuan Pekerjaan (D+E) 35,822.99
A.4.2.1.4 Pembuatan Pintu besi plat baja tebal 2 mm rangkap, rk besi siku

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA kg
Pekerja L.01 OH 1.050 100,000.00 105,000.00
Tukang las L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 125,000.00 13,125.00
Mandor L.04 OH 0.052 130,000.00 6,760.00

JUMLAH TENAGA KERJA 250,885.00


B BAHAN
Besi profil kg 15.000 13,815.00 207,225.00
Besi plat kg 32.800 15,858.00 520,142.40
Kawat las Kg 0.050 35,307.00 1,765.35

JUMLAH HARGA BAHAN 729,132.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 980,017.75
E Overhead & Profit (10%) 10% x D 98,001.78
F Harga Satuan Pekerjaan (D+E) 1,078,019.53

A.4.2.1.5 Pengerjaan 10 cm pengelasan dengan las listrik

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA cm
Pekerja L.01 OH 0.040 100,000.00 4,000.00
Tukang las L.02 OH 0.020 120,000.00 2,400.00
Kepala tukang L.03 OH 0.002 125,000.00 250.00
Mandor L.04 OH 0.002 130,000.00 260.00

JUMLAH TENAGA KERJA 6,910.00


B BAHAN
Kawat las Kg 0.400 35,307.00 14,122.80
Solar liter 0.300 6,000.00 1,800.00
Minyak begesting liter 0.040 8,721.00 348.84
JUMLAH HARGA BAHAN 16,271.64
C PERALATAN
Sewa alat Jam 0.170 35,000.00 5,950.00
JUMLAH HARGA ALAT 5,950.00
D Jumlah (A+B+C) 29,131.64
E Overhead & Profit (10%) 10% x D 2,913.16
F Harga Satuan Pekerjaan (D+E) 32,044.80

A.4.2.1.7 Pemasangan pintu rolling door besi

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.200 100,000.00 120,000.00
Tukang las L.02 OH 1.200 120,000.00 144,000.00
Kepala tukang L.03 OH 0.120 125,000.00 15,000.00
Mandor L.04 OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 279,780.00
B BAHAN
Pintu rolling door besi m2 1.000 499,950.00 499,950.00

JUMLAH HARGA BAHAN 499,950.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 779,730.00
E Overhead & Profit (10%) 10% x D 77,973.00
F Harga Satuan Pekerjaan (D+E) 857,703.00
A.4.2.1.8 Pemasangan pintu lipat (folding door)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.440 100,000.00 44,000.00
Tukang las L.02 OH 0.440 120,000.00 52,800.00
Kepala tukang L.03 OH 0.044 125,000.00 5,500.00
Mandor L.04 OH 0.022 130,000.00 2,860.00

JUMLAH TENAGA KERJA 105,160.00


B BAHAN
Pintu lipat besi m2 1.000 568,080.00 568,080.00

JUMLAH HARGA BAHAN 568,080.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 673,240.00
E Overhead & Profit (10%) 10% x D 67,324.00
F Harga Satuan Pekerjaan (D+E) 740,564.00

A.4.2.1.10 Pemasangan rolling door aluminium

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang las L.02 OH 1.000 120,000.00 120,000.00
Kepala tukang L.03 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00

JUMLAH TENAGA KERJA 239,000.00


B BAHAN
Pintu rolling door aluminium m2 1.000 545,400.00 545,400.00

JUMLAH HARGA BAHAN 545,400.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 784,400.00
E Overhead & Profit (10%) 10% x D 78,440.00
F Harga Satuan Pekerjaan (D+E) 862,840.00

A.4.2.1.11 Pemasangan kusen pintu dan jendela aluminium 3" silver

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 125,000.00 537.50
Mandor L.04 OH 0.0021 130,000.00 273.00
JUMLAH TENAGA KERJA 10,270.50
B BAHAN
Profil aluminium 3" silver m 1.100 63,000.00 69,300.00
Skrup fixer bh 2.000 3,330.00 6,660.00
Sealant tube 0.060 76,788.00 4,607.28

JUMLAH HARGA BAHAN 80,567.28


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 90,837.78
E Overhead & Profit (10%) 10% x D 9,083.78
F Harga Satuan Pekerjaan (D+E) 99,921.56
A.4.2.1.11.1 Pemasangan kusen pintu dan jendela aluminium 4" silver

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 125,000.00 537.50
Mandor L.04 OH 0.0021 130,000.00 273.00

JUMLAH TENAGA KERJA 10,270.50


B BAHAN
Profil aluminium 4" silver m 1.100 72,000.00 79,200.00
Skrup fixer bh 2.000 3,330.00 6,660.00
Sealant tube 0.060 76,788.00 4,607.28

JUMLAH HARGA BAHAN 90,467.28


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 100,737.78
E Overhead & Profit (10%) 10% x D 10,073.78
F Harga Satuan Pekerjaan (D+E) 110,811.56

A.4.2.1.11.2 Pemasangan kusen pintu dan jendela aluminium 3" brown

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 125,000.00 537.50
Mandor L.04 OH 0.0021 130,000.00 273.00

JUMLAH TENAGA KERJA 10,270.50


B BAHAN
Profil aluminium 3" brown m 1.100 64,863.00 71,349.30
Skrup fixer bh 2.000 3,330.00 6,660.00
Sealant tube 0.060 76,788.00 4,607.28

JUMLAH HARGA BAHAN 82,616.58


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 92,887.08
E Overhead & Profit (10%) 10% x D 9,288.71
F Harga Satuan Pekerjaan (D+E) 102,175.79

A.4.2.1.11.3 Memasang kusen pintu dan jendela aluminium 4" brown

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.043 100,000.00 4,300.00
Tukang aluminium L.02 OH 0.043 120,000.00 5,160.00
Kepala tukang L.03 OH 0.0043 125,000.00 537.50
Mandor L.04 OH 0.0021 130,000.00 273.00

JUMLAH TENAGA KERJA 10,270.50


B BAHAN
Profil aluminium 4" brown m 1.100 72,495.00 79,744.50
Skrup fixer bh 2.000 3,330.00 6,660.00
Sealant tube 0.060 76,788.00 4,607.28

JUMLAH HARGA BAHAN 91,011.78


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 101,282.28
E Overhead & Profit (10%) 10% x D 10,128.23
F Harga Satuan Pekerjaan (D+E) 111,410.51
A.4.2.1.12 Pemasangan pintu aluminium strip lebar 8 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.085 100,000.00 8,500.00
Tukang aluminium L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.0085 125,000.00 1,062.50
Mandor L.04 OH 0.0042 130,000.00 546.00

JUMLAH TENAGA KERJA 20,308.50


B BAHAN
Profil aluminium 3" silver m 4.400 63,000.00 277,200.00
Aluminium strip 8 cm m 14.600 22,248.00 324,820.80

JUMLAH HARGA BAHAN 602,020.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 622,329.30
E Overhead & Profit (10%) 10% x D 62,232.93
F Harga Satuan Pekerjaan (D+E) 684,562.23

A.4.2.1.13 Pemasangan daun pintu & jendela kaca bening rangka aluminium

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.085 100,000.00 8,500.00
Tukang aluminium L.02 OH 0.085 120,000.00 10,200.00
Kepala tukang L.03 OH 0.0085 125,000.00 1,062.50
Mandor L.04 OH 0.0042 130,000.00 546.00

JUMLAH TENAGA KERJA 20,308.50


B BAHAN
Profil aluminium 3" silver m 4.400 63,000.00 277,200.00
Kaca bening 5 mm m2 0.900 73,584.00 66,225.60
Sealant tube 0.270 76,788.00 20,732.76

JUMLAH HARGA BAHAN 364,158.36


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 384,466.86
E Overhead & Profit (10%) 10% x D 38,446.69
F Harga Satuan Pekerjaan (D+E) 422,913.55

A.4.2.1.14 Pemasangan venetions blinds dan vertical blinds

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang aluminium L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.018 130,000.00 2,340.00
JUMLAH TENAGA KERJA 83,715.00
B BAHAN
Vertical blinds/venetions blinds m2 1.000 68,571.00 68,571.00

JUMLAH HARGA BAHAN 68,571.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 152,286.00
E Overhead & Profit (10%) 10% x D 15,228.60
F Harga Satuan Pekerjaan (D+E) 167,514.60
A.4.2.1.15 Pemasangan terali besi strip

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.670 100,000.00 167,000.00
Tukang las L.02 OH 1.670 120,000.00 200,400.00
Kepala tukang L.03 OH 0.167 125,000.00 20,875.00
Mandor L.04 OH 0.083 130,000.00 10,790.00

JUMLAH TENAGA KERJA 399,065.00


B BAHAN
Besi strip kg 6.177 15,903.00 98,232.83
Pengelasan cm 27.080 3,204.48 86,777.33

JUMLAH HARGA BAHAN 185,010.16


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 584,075.16
E Overhead & Profit (10%) 10% x D 58,407.52
F Harga Satuan Pekerjaan (D+E) 642,482.68

A.4.2.1.18 Pemasangan talang datar/jurai seng bjls 28 lebar 90 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.200 125,000.00 25,000.00
Mandor L.04 OH 0.001 130,000.00 130.00

JUMLAH TENAGA KERJA 69,130.00


B BAHAN
Talang seng t = 0.3 mm L = 90 m' 1.050 51,768.00 54,356.40
Paku kg 0.015 13,887.00 208.30
Kayu meranti m3 0.019 7,090,200.00 134,713.80

JUMLAH HARGA BAHAN 189,278.51


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 258,408.51
E Overhead & Profit (10%) 10% x D 25,840.85
F Harga Satuan Pekerjaan (D+E) 284,249.36

A.4.2.1.19 Pemasangan talang ½ lingkaran D-15cm, seng plat bjls 30 lb 45 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang besi L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 55,790.00
B BAHAN
Talang seng t = 0.3 mm L = 45 m' 1.050 31,770.00 33,358.50
Paku kg 0.010 13,887.00 138.87
Besi strip kg 0.500 15,903.00 7,951.50

JUMLAH HARGA BAHAN 41,448.87


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 97,238.87
E Overhead & Profit (10%) 10% x D 9,723.89
F Harga Satuan Pekerjaan (D+E) 106,962.76

A.4.2.1.20 Pemasangan rangka besi hollow 1x40.40.2mm dinding partisi

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang besi L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 59,815.00


B BAHAN
Hollow 4x4 cm m 3.500 7,238.25 25,333.88
Assesoris (perkuatan, las, dll) Ls 1.000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 75,333.88


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 135,148.88
E Overhead & Profit (10%) 10% x D 13,514.89
F Harga Satuan Pekerjaan (D+E) 148,663.76

A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.350 100,000.00 35,000.00
Tukang besi L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 125,000.00 4,375.00
Mandor L.04 OH 0.018 130,000.00 2,340.00

JUMLAH TENAGA KERJA 83,715.00


B BAHAN
Hollow 4x4 cm m 4.000 7,238.25 28,953.00
Assesoris (perkuatan, las, dll) Ls 1.000 50,000.00 50,000.00

JUMLAH HARGA BAHAN 78,953.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 162,668.00
E Overhead & Profit (10%) 10% x D 16,266.80
F Harga Satuan Pekerjaan (D+E) 178,934.80
Dihitung Pemasangan pintu PVC polos

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.050 100,000.00 105,000.00
Tukang aluminium L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 125,000.00 13,125.00
Mandor L.04 OH 0.0052 130,000.00 676.00

JUMLAH TENAGA KERJA 244,801.00


B BAHAN
Pintu PVC Polos buah 1.000 270,000.00 270,000.00

JUMLAH HARGA BAHAN 270,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 514,801.00
E Overhead & Profit (10%) 10% x D 51,480.10
F Harga Satuan Pekerjaan (D+E) 566,281.10
Dihitung Pemasangan pintu PVC motif

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.050 100,000.00 105,000.00
Tukang aluminium L.02 OH 1.050 120,000.00 126,000.00
Kepala tukang L.03 OH 0.105 125,000.00 13,125.00
Mandor L.04 OH 0.0052 130,000.00 676.00

JUMLAH TENAGA KERJA 244,801.00


B BAHAN
Pintu PVC Motif buah 1.000 343,818.00 343,818.00

JUMLAH HARGA BAHAN 343,818.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 588,619.00
E Overhead & Profit (10%) 10% x D 58,861.90
F Harga Satuan Pekerjaan (D+E) 647,480.90
X HARGA SATUAN PEKERJAAN KAYU

A.4.6.1.1 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 7.000 100,000.00 700,000.00
Tukang kayu L.02 OH 21.000 120,000.00 2,520,000.00
Kepala tukang L.03 OH 2.100 125,000.00 262,500.00
Mandor L.04 OH 0.350 130,000.00 45,500.00

JUMLAH TENAGA KERJA 3,528,000.00


B BAHAN
Kayu jati hutan kelas I m3 1.100 31,815,000.00 34,996,500.00
Paku kg 1.250 13,887.00 17,358.75
Lem kayu Kg 1.000 21,816.00 21,816.00

JUMLAH HARGA BAHAN 35,035,674.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,563,674.75
E Overhead & Profit (10%) 10% x D 3,856,367.48
F Harga Satuan Pekerjaan (D+E) 42,420,042.23

A.4.6.1.2 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 6.000 100,000.00 600,000.00
Tukang kayu L.02 OH 18.000 120,000.00 2,160,000.00
Kepala tukang L.03 OH 1.800 125,000.00 225,000.00
Mandor L.04 OH 0.300 130,000.00 39,000.00

JUMLAH TENAGA KERJA 3,024,000.00


B BAHAN
Kayu jati lokal (non ekspose) m3 1.200 10,453,500.00 12,544,200.00
Paku kg 1.250 13,887.00 17,358.75
Lem kayu Kg 1.000 21,816.00 21,816.00

JUMLAH HARGA BAHAN 12,583,374.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 15,607,374.75
E Overhead & Profit (10%) 10% x D 1,560,737.48
F Harga Satuan Pekerjaan (D+E) 17,168,112.23

A.4.6.1.2.1 Pembuatan dan Pemasangan kusen pintu dan jendela, kayu kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 6.000 100,000.00 600,000.00
Tukang kayu L.02 OH 18.000 120,000.00 2,160,000.00
Kepala tukang L.03 OH 1.800 125,000.00 225,000.00
Mandor L.04 OH 0.300 130,000.00 39,000.00

JUMLAH TENAGA KERJA 3,024,000.00


B BAHAN
Kayu kanfer m3 1.200 8,332,398.00 9,998,877.60
Paku kg 1.250 13,887.00 17,358.75
Lem kayu Kg 1.000 21,816.00 21,816.00
JUMLAH HARGA BAHAN 10,038,052.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,062,052.35
E Overhead & Profit (10%) 10% x D 1,306,205.24
F Harga Satuan Pekerjaan (D+E) 14,368,257.58

A.4.6.1.5 Pembuatan dan Pemasangan daun pintu panel, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00

JUMLAH TENAGA KERJA 504,000.00


B BAHAN
Kayu jati hutan kelas I m3 0.040 31,815,000.00 1,272,600.00
Lem kayu Kg 0.500 21,816.00 10,908.00
JUMLAH HARGA BAHAN 1,283,508.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,787,508.00
E Overhead & Profit (10%) 10% x D 178,750.80
F Harga Satuan Pekerjaan (D+E) 1,966,258.80

A.4.6.1.5.1 Pembuatan dan Pemasangan daun pintu panel, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00

JUMLAH TENAGA KERJA 504,000.00


B BAHAN
Kayu jati lokal (non ekspose) m3 0.040 10,453,500.00 418,140.00
Lem kayu Kg 0.500 21,816.00 10,908.00

JUMLAH HARGA BAHAN 429,048.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 933,048.00
E Overhead & Profit (10%) 10% x D 93,304.80
F Harga Satuan Pekerjaan (D+E) 1,026,352.80
A.4.6.1.6 Pembuatan dan Pemasangan pintu & jendela kaca, kayu klas I (tanpa kaca)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala tukang L.03 OH 0.240 125,000.00 30,000.00
Mandor L.04 OH 0.040 130,000.00 5,200.00

JUMLAH TENAGA KERJA 403,200.00


B BAHAN
Kayu jati hutan kelas I m3 0.024 31,815,000.00 763,560.00
Lem kayu Kg 0.300 21,816.00 6,544.80
JUMLAH HARGA BAHAN 770,104.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,173,304.80
E Overhead & Profit (10%) 10% x D 117,330.48
F Harga Satuan Pekerjaan (D+E) 1,290,635.28
A.4.6.1.6.1 Pembuatan dan Pemasangan pintu & jendela kaca, kayu klas II (tanpa kaca)

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.02 OH 2.400 120,000.00 288,000.00
Kepala tukang L.03 OH 0.240 125,000.00 30,000.00
Mandor L.04 OH 0.040 130,000.00 5,200.00

JUMLAH TENAGA KERJA 403,200.00


B BAHAN
Kayu jati lokal (non ekspose) m3 0.024 10,453,500.00 250,884.00
Lem kayu Kg 0.300 21,816.00 6,544.80
JUMLAH HARGA BAHAN 257,428.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 660,628.80
E Overhead & Profit (10%) 10% x D 66,062.88
F Harga Satuan Pekerjaan (D+E) 726,691.68

A.4.6.1.7 Pembuatan dan Pemasangan pintu & jendela jalusi, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00

JUMLAH TENAGA KERJA 504,000.00


B BAHAN
Kayu jati hutan kelas I m3 0.064 31,815,000.00 2,036,160.00
Lem kayu Kg 0.500 21,816.00 10,908.00

JUMLAH HARGA BAHAN 2,047,068.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,551,068.00
E Overhead & Profit (10%) 10% x D 255,106.80
F Harga Satuan Pekerjaan (D+E) 2,806,174.80

A.4.6.1.7.1 Pembuatan dan Pemasangan pintu & jendela jalusi, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang kayu L.02 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00

JUMLAH TENAGA KERJA 504,000.00


B BAHAN
Kayu jati lokal (non ekspose) m3 0.064 10,453,500.00 669,024.00
Lem kayu Kg 0.500 21,816.00 10,908.00

JUMLAH HARGA BAHAN 679,932.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,183,932.00
E Overhead & Profit (10%) 10% x D 118,393.20
F Harga Satuan Pekerjaan (D+E) 1,302,325.20
A.4.6.1.10 Pemasangan jalusi kusen kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.670 100,000.00 67,000.00
Tukang kayu L.02 OH 2.000 120,000.00 240,000.00
Kepala tukang L.03 OH 0.200 125,000.00 25,000.00
Mandor L.04 OH 0.335 130,000.00 43,550.00

JUMLAH TENAGA KERJA 375,550.00


B BAHAN
Kayu jati hutan kelas I m3 0.060 31,815,000.00 1,908,900.00
Paku kg 0.150 13,887.00 2,083.05

JUMLAH HARGA BAHAN 1,910,983.05


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,286,533.05
E Overhead & Profit (10%) 10% x D 228,653.31
F Harga Satuan Pekerjaan (D+E) 2,515,186.36

A.4.6.1.10.1 Pemasangan jalusi kusen kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.670 100,000.00 67,000.00
Tukang kayu L.02 OH 2.000 120,000.00 240,000.00
Kepala tukang L.03 OH 0.200 125,000.00 25,000.00
Mandor L.04 OH 0.335 130,000.00 43,550.00

JUMLAH TENAGA KERJA 375,550.00


B BAHAN
Kayu jati lokal (non ekspose) m3 0.060 10,453,500.00 627,210.00
Paku kg 0.150 13,887.00 2,083.05

JUMLAH HARGA BAHAN 629,293.05


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,004,843.05
E Overhead & Profit (10%) 10% x D 100,484.31
F Harga Satuan Pekerjaan (D+E) 1,105,327.36

A.4.6.1.13 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 4.000 100,000.00 400,000.00
Tukang kayu L.02 OH 12.000 120,000.00 1,440,000.00
Kepala tukang L.03 OH 1.200 125,000.00 150,000.00
Mandor L.04 OH 0.200 130,000.00 26,000.00

JUMLAH TENAGA KERJA 2,016,000.00


B BAHAN
Kayu jati lokal (non ekspose) m3 1.100 10,453,500.00 11,498,850.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 5.600 13,887.00 77,767.20

JUMLAH HARGA BAHAN 11,815,162.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 13,831,162.20
E Overhead & Profit (10%) 10% x D 1,383,116.22
F Harga Satuan Pekerjaan (D+E) 15,214,278.42
A.4.6.1.13.1 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 4.000 100,000.00 400,000.00
Tukang kayu L.02 OH 12.000 120,000.00 1,440,000.00
Kepala tukang L.03 OH 1.200 125,000.00 150,000.00
Mandor L.04 OH 0.200 130,000.00 26,000.00

JUMLAH TENAGA KERJA 2,016,000.00


B BAHAN
Kayu kruing m3 1.100 7,090,200.00 7,799,220.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 5.600 13,887.00 77,767.20

JUMLAH HARGA BAHAN 8,115,532.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,131,532.20
E Overhead & Profit (10%) 10% x D 1,013,153.22
F Harga Satuan Pekerjaan (D+E) 11,144,685.42

A.4.6.1.13.2 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 4.000 100,000.00 400,000.00
Tukang kayu L.02 OH 12.000 120,000.00 1,440,000.00
Kepala tukang L.03 OH 1.200 125,000.00 150,000.00
Mandor L.04 OH 0.200 130,000.00 26,000.00

JUMLAH TENAGA KERJA 2,016,000.00


B BAHAN
Kayu meranti m3 1.100 7,090,200.00 7,799,220.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 5.600 13,887.00 77,767.20

JUMLAH HARGA BAHAN 8,115,532.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 10,131,532.20
E Overhead & Profit (10%) 10% x D 1,013,153.22
F Harga Satuan Pekerjaan (D+E) 11,144,685.42

A.4.6.1.14 Pemasangan konstruksi kuda-kuda expose, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m3
Pekerja L.01 OH 6.700 100,000.00 670,000.00
Tukang kayu L.02 OH 20.100 120,000.00 2,412,000.00
Kepala tukang L.03 OH 2.010 125,000.00 251,250.00
Mandor L.04 OH 0.335 130,000.00 43,550.00

JUMLAH TENAGA KERJA 3,376,800.00


B BAHAN
Kayu jati hutan kelas I m3 1.200 31,815,000.00 38,178,000.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 5.600 13,887.00 77,767.20

JUMLAH HARGA BAHAN 38,494,312.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 41,871,112.20
E Overhead & Profit (10%) 10% x D 4,187,111.22
F Harga Satuan Pekerjaan (D+E) 46,058,223.42
A.4.6.1.15 Pemasangan konstruksi gording, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 2.400 100,000.00 240,000.00
Tukang kayu L.02 OH 7.200 120,000.00 864,000.00
Kepala tukang L.03 OH 0.720 125,000.00 90,000.00
Mandor L.04 OH 0.120 130,000.00 15,600.00

JUMLAH TENAGA KERJA 1,209,600.00


B BAHAN
Kayu jati lokal (non ekspose) m3 1.100 10,453,500.00 11,498,850.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 3.000 13,887.00 41,661.00

JUMLAH HARGA BAHAN 11,779,056.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 12,988,656.00
E Overhead & Profit (10%) 10% x D 1,298,865.60
F Harga Satuan Pekerjaan (D+E) 14,287,521.60

A.4.6.1.15.1 Pemasangan konstruksi gording, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 2.400 100,000.00 240,000.00
Tukang kayu L.02 OH 7.200 120,000.00 864,000.00
Kepala tukang L.03 OH 0.720 125,000.00 90,000.00
Mandor L.04 OH 0.120 130,000.00 15,600.00

JUMLAH TENAGA KERJA 1,209,600.00


B BAHAN
Kayu kruing m3 1.100 7,090,200.00 7,799,220.00
Besi strip kg 15.000 15,903.00 238,545.00
Paku kg 3.000 13,887.00 41,661.00

JUMLAH HARGA BAHAN 8,079,426.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 9,289,026.00
E Overhead & Profit (10%) 10% x D 928,902.60
F Harga Satuan Pekerjaan (D+E) 10,217,928.60

A.4.6.1.16 Pemasangan rangka atap genteng, kaso & reng kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk jati ukuran 5 x 7 m3 0.014 6,363,000.00 89,082.00
Kayu reng jati 2/3 m3 0.036 5,454,000.00 196,344.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 288,897.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 312,797.75
E Overhead & Profit (10%) 10% x D 31,279.78
F Harga Satuan Pekerjaan (D+E) 344,077.53
A.4.6.1.16.1 Pemasangan rangka atap genteng, kaso & reng kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk kruing m3 0.014 6,908,400.00 96,717.60
Kayu reng jati 2/3 m3 0.036 5,454,000.00 196,344.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 296,533.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 320,433.35
E Overhead & Profit (10%) 10% x D 32,043.34
F Harga Satuan Pekerjaan (D+E) 352,476.69

A.4.6.1.16.2 Pemasangan rangka atap genteng, kaso & reng kayu kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk kruing m3 0.014 6,908,400.00 96,717.60
Kayu reng kruing 2/3 m3 0.036 7,272,000.00 261,792.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 361,981.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 385,881.35
E Overhead & Profit (10%) 10% x D 38,588.14
F Harga Satuan Pekerjaan (D+E) 424,469.49

A.4.6.1.17 Pemasangan rangka atap genteng beton, kaso & reng kayu klas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk jati ukuran 5 x 7 m3 0.014 6,363,000.00 89,082.00
Kayu reng jati 2/3 m3 0.057 5,454,000.00 310,878.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 403,431.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 427,331.75
E Overhead & Profit (10%) 10% x D 42,733.18
F Harga Satuan Pekerjaan (D+E) 470,064.93
A.4.6.1.17.1 Pemasangan rangka atap genteng beton, kaso & reng kayu klas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk kruing m3 0.014 6,908,400.00 96,717.60
Kayu reng jati 2/3 m3 0.057 5,454,000.00 310,878.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 411,067.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 434,967.35
E Overhead & Profit (10%) 10% x D 43,496.74
F Harga Satuan Pekerjaan (D+E) 478,464.08

A.4.6.1.17.2 Pemasangan rangka atap genteng beton, kaso & reng kayu klas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu usuk kruing m3 0.014 6,908,400.00 96,717.60
Kayu reng kruing 2/3 m3 0.057 7,272,000.00 414,504.00
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 514,693.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 538,593.35
E Overhead & Profit (10%) 10% x D 53,859.34
F Harga Satuan Pekerjaan (D+E) 592,452.68

A.4.6.1.19 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.075 130,000.00 9,750.00

JUMLAH TENAGA KERJA 64,500.00


B BAHAN
Kayu usuk kruing m3 0.0154 6,908,400.00 106,389.36
Paku kg 0.200 13,887.00 2,777.40

JUMLAH HARGA BAHAN 109,166.76


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 173,666.76
E Overhead & Profit (10%) 10% x D 17,366.68
F Harga Satuan Pekerjaan (D+E) 191,033.44
A.4.6.1.19.1 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.075 130,000.00 9,750.00

JUMLAH TENAGA KERJA 64,500.00


B BAHAN
Kayu usuk meranti m3 0.0154 6,908,400.00 106,389.36
Paku kg 0.200 13,887.00 2,777.40

JUMLAH HARGA BAHAN 109,166.76


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 173,666.76
E Overhead & Profit (10%) 10% x D 17,366.68
F Harga Satuan Pekerjaan (D+E) 191,033.44

A.4.6.1.20 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.010 130,000.00 1,300.00

JUMLAH TENAGA KERJA 61,050.00


B BAHAN
Kayu usuk kruing m3 0.0163 6,908,400.00 112,606.92
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 116,078.67


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,128.67
E Overhead & Profit (10%) 10% x D 17,712.87
F Harga Satuan Pekerjaan (D+E) 194,841.54

A.4.6.1.20.1 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.010 130,000.00 1,300.00

JUMLAH TENAGA KERJA 61,050.00


B BAHAN
Kayu usuk meranti m3 0.0163 6,908,400.00 112,606.92
Paku kg 0.250 13,887.00 3,471.75

JUMLAH HARGA BAHAN 116,078.67


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,128.67
E Overhead & Profit (10%) 10% x D 17,712.87
F Harga Satuan Pekerjaan (D+E) 194,841.54
A.4.6.1.21 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 37,150.00


B BAHAN
Kayu jati hutan kelas I m3 0.0108 31,815,000.00 343,602.00
Paku kg 0.100 13,887.00 1,388.70

JUMLAH HARGA BAHAN 344,990.70


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 382,140.70
E Overhead & Profit (10%) 10% x D 38,214.07
F Harga Satuan Pekerjaan (D+E) 420,354.77

A.4.6.1.21.1 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 37,150.00


B BAHAN
Kayu kruing m3 0.0108 7,090,200.00 76,574.16
Paku kg 0.100 13,887.00 1,388.70

JUMLAH HARGA BAHAN 77,962.86


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 115,112.86
E Overhead & Profit (10%) 10% x D 11,511.29
F Harga Satuan Pekerjaan (D+E) 126,624.15

A.4.6.1.22 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 37,150.00


B BAHAN
Kayu jati hutan kelas I m3 0.011 31,815,000.00 349,965.00
Paku kg 0.050 13,887.00 694.35

JUMLAH HARGA BAHAN 350,659.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 387,809.35
E Overhead & Profit (10%) 10% x D 38,780.94
F Harga Satuan Pekerjaan (D+E) 426,590.29
A.4.6.1.22.1 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 37,150.00


B BAHAN
Kayu kruing m3 0.011 7,090,200.00 77,992.20
Paku kg 0.050 13,887.00 694.35

JUMLAH HARGA BAHAN 78,686.55


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 115,836.55
E Overhead & Profit (10%) 10% x D 11,583.66
F Harga Satuan Pekerjaan (D+E) 127,420.21

A.4.6.1.23 Pemasangan rangka dinding pemisah (60 x 120) cm ky kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 75,665.00


B BAHAN
Kayu kruing m3 0.028 7,090,200.00 198,525.60
Paku kg 0.150 13,887.00 2,083.05

JUMLAH HARGA BAHAN 200,608.65


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 276,273.65
E Overhead & Profit (10%) 10% x D 27,627.37
F Harga Satuan Pekerjaan (D+E) 303,901.02

A.4.6.1.23.1 Pemasangan rangka dinding pemisah (60 x 120) cm ky kelas III

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 75,665.00


B BAHAN
Kayu usuk meranti m3 0.028 6,908,400.00 193,435.20
Paku kg 0.150 13,887.00 2,083.05

JUMLAH HARGA BAHAN 195,518.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 271,183.25
E Overhead & Profit (10%) 10% x D 27,118.33
F Harga Satuan Pekerjaan (D+E) 298,301.58
A.4.6.1.24 Pemasangan dinding pemisah teakwood rangkap, rangka ky kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.450 120,000.00 54,000.00
Kepala tukang L.03 OH 0.045 125,000.00 5,625.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 75,665.00


B BAHAN
Kayu kruing m3 0.028 7,090,200.00 198,525.60
Paku kg 0.150 13,887.00 2,083.05
Teak wood 120 x 240 cm lembar 0.860 152,343.00 131,014.98
Lem kayu Kg 0.560 21,816.00 12,216.96

JUMLAH HARGA BAHAN 343,840.59


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 419,505.59
E Overhead & Profit (10%) 10% x D 41,950.56
F Harga Satuan Pekerjaan (D+E) 461,456.15

A.4.6.1.25 Pemasangan dinding pemisah plywood rangkap, rangka ky kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.600 120,000.00 72,000.00
Kepala tukang L.03 OH 0.060 125,000.00 7,500.00
Mandor L.04 OH 0.010 130,000.00 1,300.00

JUMLAH TENAGA KERJA 100,800.00


B BAHAN
Kayu kruing m3 0.028 7,090,200.00 198,525.60
Paku kg 0.150 13,887.00 2,083.05
Kayu lapis/ tripleks tb. 4 mm lembar 0.860 57,222.00 49,210.92
Lem kayu Kg 0.560 21,816.00 12,216.96

JUMLAH HARGA BAHAN 262,036.53


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 362,836.53
E Overhead & Profit (10%) 10% x D 36,283.65
F Harga Satuan Pekerjaan (D+E) 399,120.18

A.4.6.1.26 Pemasangan dinding lambrisering dari papan kayu kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang kayu L.02 OH 1.800 120,000.00 216,000.00
Kepala tukang L.03 OH 0.180 125,000.00 22,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 302,400.00
B BAHAN
Kayu jati hutan kelas I m3 0.007 31,815,000.00 222,705.00
Paku kg 0.100 13,887.00 1,388.70
Paku skrup kg 0.150 33,372.00 5,005.80

JUMLAH HARGA BAHAN 229,099.50


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 531,499.50
E Overhead & Profit (10%) 10% x D 53,149.95
F Harga Satuan Pekerjaan (D+E) 584,649.45
A.4.6.1.27 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.025 100,000.00 2,500.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.001 130,000.00 130.00

JUMLAH TENAGA KERJA 12,630.00


B BAHAN
Teak wood 120 x 240 cm lembar 0.400 152,343.00 60,937.20
Paku kg 0.050 13,887.00 694.35

JUMLAH HARGA BAHAN 61,631.55


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 74,261.55
E Overhead & Profit (10%) 10% x D 7,426.16
F Harga Satuan Pekerjaan (D+E) 81,687.71
IX HARGA SATUAN PEKERJAAN PENUTUP ATAP

Dihitung Pemasangan genteng kodok kebumen

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 26,040.00


B BAHAN
Genteng kodok kebumen bh 25.000 2,835.00 70,875.00

JUMLAH HARGA BAHAN 70,875.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 96,915.00
E Overhead & Profit (10%) 10% x D 9,691.50
F Harga Satuan Pekerjaan (D+E) 106,606.50

Dihitung Pemasangan genteng magas kebumen

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 26,040.00


B BAHAN
Genteng magas kebumen bh 25.000 2,799.00 69,975.00
JUMLAH HARGA BAHAN 69,975.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 96,015.00
E Overhead & Profit (10%) 10% x D 9,601.50
F Harga Satuan Pekerjaan (D+E) 105,616.50

Dihitung Pemasangan genteng mantili mojolaban

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00
JUMLAH TENAGA KERJA 26,040.00
B BAHAN
Genteng mantili mojolaban bh 25.000 3,708.00 92,700.00

JUMLAH HARGA BAHAN 92,700.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 118,740.00
E Overhead & Profit (10%) 10% x D 11,874.00
F Harga Satuan Pekerjaan (D+E) 130,614.00

Dihitung Pemasangan genteng morando kebumen

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 26,040.00


B BAHAN
Genteng morando kebumen bh 18.000 2,178.00 39,204.00

JUMLAH HARGA BAHAN 39,204.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,244.00
E Overhead & Profit (10%) 10% x D 6,524.40
F Harga Satuan Pekerjaan (D+E) 71,768.40

Dihitung Pemasangan genteng pelentong kebumen

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.075 120,000.00 9,000.00
Kepala tukang L.03 OH 0.008 125,000.00 1,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 26,040.00


B BAHAN
Genteng pelentong kebumen bh 25.000 1,521.00 38,025.00

JUMLAH HARGA BAHAN 38,025.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 64,065.00
E Overhead & Profit (10%) 10% x D 6,406.50
F Harga Satuan Pekerjaan (D+E) 70,471.50

A.4.5.2.30 Pemasangan genteng beton


Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.010 130,000.00 1,300.00

JUMLAH TENAGA KERJA 34,550.00


B BAHAN
Genteng beton bh 11.000 6,174.00 67,914.00
Paku kg 0.030 13,887.00 416.61

JUMLAH HARGA BAHAN 68,330.61


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 102,880.61
E Overhead & Profit (10%) 10% x D 10,288.06
F Harga Satuan Pekerjaan (D+E) 113,168.67
A.4.5.2.32 Pemasangan genteng metal kelas I

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00

JUMLAH TENAGA KERJA 33,380.00


B BAHAN
Genteng metal kelas I m2 1.020 208,845.00 213,021.90
Paku beton kg 0.200 30,537.00 6,107.40

JUMLAH HARGA BAHAN 219,129.30


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 252,509.30
E Overhead & Profit (10%) 10% x D 25,250.93
F Harga Satuan Pekerjaan (D+E) 277,760.23

A.4.5.2.32.1 Pemasangan genteng metal kelas II

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.001 130,000.00 130.00

JUMLAH TENAGA KERJA 33,380.00


B BAHAN
Genteng metal kelas II m2 1.020 112,203.00 114,447.06
Paku beton kg 0.200 30,537.00 6,107.40

JUMLAH HARGA BAHAN 120,554.46


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 153,934.46
E Overhead & Profit (10%) 10% x D 15,393.45
F Harga Satuan Pekerjaan (D+E) 169,327.91

Dihitung Pemasangan bubungan pada atap genteng kebumen

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00
JUMLAH TENAGA KERJA 66,760.00
B BAHAN
Bubung genteng kebumen bh 5.000 8,793.00 43,965.00
Semen PC. Kg 10.800 1,180.00 12,744.00
Pasir pasang m3 0.032 195,000.00 6,240.00

JUMLAH HARGA BAHAN 62,949.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 129,709.00
E Overhead & Profit (10%) 10% x D 12,970.90
F Harga Satuan Pekerjaan (D+E) 142,679.90

Dihitung Pemasangan bubungan pada atap genteng mojolaban

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00

JUMLAH TENAGA KERJA 66,760.00


B BAHAN
Bubung genteng mojolaban bh 5.000 6,102.00 30,510.00
Semen PC. Kg 10.800 1,180.00 12,744.00
Pasir pasang m3 0.032 195,000.00 6,240.00

JUMLAH HARGA BAHAN 49,494.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 116,254.00
E Overhead & Profit (10%) 10% x D 11,625.40
F Harga Satuan Pekerjaan (D+E) 127,879.40

A.4.5.2.34 Pemasangan bubungan pada atap genteng beton

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.400 100,000.00 40,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.002 130,000.00 260.00

JUMLAH TENAGA KERJA 66,760.00


B BAHAN
Bubung genteng beton bh 3.500 14,310.00 50,085.00
Semen PC. Kg 10.800 1,180.00 12,744.00
Semen warna Kg 1.000 11,700.00 11,700.00
Pasir pasang m3 0.032 195,000.00 6,240.00
JUMLAH HARGA BAHAN 80,769.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 147,529.00
E Overhead & Profit (10%) 10% x D 14,752.90
F Harga Satuan Pekerjaan (D+E) 162,281.90

A.4.5.2.36 Pemasangan bubungan pada atap genteng metal kelas I

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.025 100,000.00 2,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 24,065.00


B BAHAN
Kerpus genting metal kelas I Bh 2.500 51,993.00 129,982.50
Paku beton kg 0.020 30,537.00 610.74

JUMLAH HARGA BAHAN 130,593.24


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 154,658.24
E Overhead & Profit (10%) 10% x D 15,465.82
F Harga Satuan Pekerjaan (D+E) 170,124.06

A.4.5.2.36.1 Pemasangan bubungan pada atap genteng metal kelas II

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.025 100,000.00 2,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 24,065.00


B BAHAN
Kerpus genting metal kelas II Bh 2.500 29,880.00 74,700.00
Paku beton kg 0.020 30,537.00 610.74

JUMLAH HARGA BAHAN 75,310.74


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 99,375.74
E Overhead & Profit (10%) 10% x D 9,937.57
F Harga Satuan Pekerjaan (D+E) 109,313.31

A.4.5.2.38 Pemasangan atap seng gelombang (0,8 x 1,80)

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.120 100,000.00 12,000.00
Tukang kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 20,730.00


B BAHAN
Seng gelombang 0,8 x 1,80 lembar 0.700 65,880.00 46,116.00
Paku kg 0.020 13,887.00 277.74

JUMLAH HARGA BAHAN 46,393.74


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 67,123.74
E Overhead & Profit (10%) 10% x D 6,712.37
F Harga Satuan Pekerjaan (D+E) 73,836.11

A.4.5.2.38.1 Pemasangan atap seng gelombang (0,8 x 2,10)

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.120 100,000.00 12,000.00
Tukang kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 20,730.00


B BAHAN
Seng gelombang 0,8 x 2,10 lembar 0.700 77,220.00 54,054.00
Paku kg 0.020 13,887.00 277.74

JUMLAH HARGA BAHAN 54,331.74


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 75,061.74
E Overhead & Profit (10%) 10% x D 7,506.17
F Harga Satuan Pekerjaan (D+E) 82,567.91

A.4.5.2.39 Pemasangan nok atap seng

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 25,055.00


B BAHAN
Seng plat (90 x 180) lembar 0.300 39,600.00 11,880.00
Paku kg 0.040 13,887.00 555.48

JUMLAH HARGA BAHAN 12,435.48


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 37,490.48
E Overhead & Profit (10%) 10% x D 3,749.05
F Harga Satuan Pekerjaan (D+E) 41,239.53

A.4.5.2.40 Pemasangan atap alumunium

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.750 120,000.00 90,000.00
Kepala tukang L.03 OH 0.080 125,000.00 10,000.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 115,780.00


B BAHAN
Penutup atap aluminium gelombang m2 1.050 193,428.00 203,099.40
Paku kg 0.020 13,887.00 277.74

JUMLAH HARGA BAHAN 203,377.14


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 319,157.14
E Overhead & Profit (10%) 10% x D 31,915.71
F Harga Satuan Pekerjaan (D+E) 351,072.85

A.4.5.2.42 Pemasangan Alumunium Foil / sisalation

Jumlah Harga
No URAIAN Kode Satuan Koefisien Harga Satuan (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 22,665.00


B BAHAN
Aluminium foil m2 1.050 40,500.00 42,525.00

JUMLAH HARGA BAHAN 42,525.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 65,190.00
E Overhead & Profit (10%) 10% x D 6,519.00
F Harga Satuan Pekerjaan (D+E) 71,709.00
VIII SATUAN PEKERJAAN LANGIT-LANGIT (PLAPON)

A.4.5.1.2 Pemasangan langit-langit akustik ukuran (30 x 30) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.120 100,000.00 12,000.00
Tukang kayu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00
JUMLAH TENAGA KERJA 28,680.00
B BAHAN
Papan akustik softboard 30 x 30 lembar 12.000 17,595.00 211,140.00
Paku kg 0.050 13,887.00 694.35
JUMLAH HARGA BAHAN 211,834.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 240,514.35
E Overhead & Profit (10%) 10% x D 24,051.44
F Harga Satuan Pekerjaan (D+E) 264,565.79

A.4.5.1.3 Pemasangan langit-langit akustik ukuran (30 x 60) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.120 100,000.00 12,000.00
Tukang kayu L.02 OH 0.120 120,000.00 14,400.00
Kepala tukang L.03 OH 0.012 125,000.00 1,500.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 28,680.00


B BAHAN
Papan akustik softboard 30 x 60 lembar 5.800 54,243.00 314,609.40
Paku kg 0.050 13,887.00 694.35

JUMLAH HARGA BAHAN 315,303.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 343,983.75
E Overhead & Profit (10%) 10% x D 34,398.37
F Harga Satuan Pekerjaan (D+E) 378,382.12

A.4.5.1.4 Pemasangan langit-langit akustik ukuran (60 x 120) cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7
A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 23,900.00
B BAHAN
Papan akustik softboard 60 x 120 lembar 1.500 150,093.00 225,139.50
Paku kg 0.050 13,887.00 694.35
JUMLAH HARGA BAHAN 225,833.85
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 249,733.85
E Overhead & Profit (10%) 10% x D 24,973.39
F Harga Satuan Pekerjaan (D+E) 274,707.24
A.4.5.1.5 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 3 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 23,900.00
B BAHAN
Kayu lapis/ tripleks tb. 3 mm lembar 0.375 50,904.00 19,089.00
Paku kg 0.030 13,887.00 416.61
JUMLAH HARGA BAHAN 19,505.61
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 43,405.61
E Overhead & Profit (10%) 10% x D 4,340.56
F Harga Satuan Pekerjaan (D+E) 47,746.17

A.4.5.1.5.1 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 4 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 23,900.00
B BAHAN
Kayu lapis/ tripleks tb. 4 mm lembar 0.375 57,222.00 21,458.25
Paku kg 0.030 13,887.00 416.61
JUMLAH HARGA BAHAN 21,874.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 45,774.86
E Overhead & Profit (10%) 10% x D 4,577.49
F Harga Satuan Pekerjaan (D+E) 50,352.35

A.4.5.1.5.2 Pemasangan langit-langit tripleks ukuran (120 x 240), tbl 6 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 23,900.00


B BAHAN
Kayu lapis/ tripleks tb. 6 mm lembar 0.375 74,970.00 28,113.75
Paku kg 0.030 13,887.00 416.61

JUMLAH HARGA BAHAN 28,530.36


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,430.36
E Overhead & Profit (10%) 10% x D 5,243.04
F Harga Satuan Pekerjaan (D+E) 57,673.40
A.4.5.1.6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.800 100,000.00 80,000.00
Tukang kayu L.02 OH 0.800 120,000.00 96,000.00
Kepala tukang L.03 OH 0.080 125,000.00 10,000.00
Mandor L.04 OH 0.040 130,000.00 5,200.00

JUMLAH TENAGA KERJA 191,200.00


B BAHAN
Kayu sengon untuk begesting (papan/kaso) m3 0.015 2,476,980.00 37,154.70
Paku kg 0.010 13,887.00 138.87

JUMLAH HARGA BAHAN 37,293.57


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 228,493.57
E Overhead & Profit (10%) 10% x D 22,849.36
F Harga Satuan Pekerjaan (D+E) 251,342.93

A.4.5.1.7 Pemasangan langit-langit gypsum board uk (120x240), tbl 9 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 17,275.00
B BAHAN
Gipsum lembar 0.364 65,223.00 23,741.17
Paku skrup kg 0.110 33,372.00 3,670.92
JUMLAH HARGA BAHAN 27,412.09
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 44,687.09
E Overhead & Profit (10%) 10% x D 4,468.71
F Harga Satuan Pekerjaan (D+E) 49,155.80

Dihitung Pemasangan langit-langit calsiboard

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 17,275.00


B BAHAN
Calsiboard m2 1.050 48,429.00 50,850.45
Paku skrup kg 0.110 33,372.00 3,670.92

JUMLAH HARGA BAHAN 54,521.37


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 71,796.37
E Overhead & Profit (10%) 10% x D 7,179.64
F Harga Satuan Pekerjaan (D+E) 78,976.01

Dihitung Pemasangan langit-langit harplek

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.005 130,000.00 650.00

B BAHAN
Harflek m2 1.050 19,998.00 20,997.90
Paku skrup kg 0.110 33,372.00 3,670.92
JUMLAH HARGA BAHAN 24,668.82
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 41,943.82
E Overhead & Profit (10%) 10% x D 4,194.38
F Harga Satuan Pekerjaan (D+E) 46,138.20

A.4.5.1.8 Pemasangan langit-langit akustik uk (60 x 120) cm + rangka aluminium

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.500 100,000.00 50,000.00
Tukang besi L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.025 130,000.00 3,250.00

JUMLAH TENAGA KERJA 119,500.00


B BAHAN
Hollow 4x4 cm btg 3.600 28,953.00 104,230.80
Ramset/dina bolt bh 1.050 5,454.00 5,726.70
Kawat galvanis kg 0.150 18,180.00 2,727.00
Papan akustik softboard 60 x 120 lembar 1.500 150,093.00 225,139.50
JUMLAH HARGA BAHAN 337,824.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 457,324.00
E Overhead & Profit (10%) 10% x D 45,732.40
F Harga Satuan Pekerjaan (D+E) 503,056.40

A.4.5.1.9 Pemasangan list langit-langit kayu profil

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Tukang kayu L.02 OH 0.050 120,000.00 6,000.00
Kepala tukang L.03 OH 0.005 125,000.00 625.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 12,015.00


B BAHAN
Lis kayu profil 5 cm m' 1.050 10,908.00 11,453.40
Paku kg 0.010 13,887.00 138.87

JUMLAH HARGA BAHAN 11,592.27


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,607.27
E Overhead & Profit (10%) 10% x D 2,360.73
F Harga Satuan Pekerjaan (D+E) 25,968.00
Dihitung Pemasangan list plafond gypsum profil

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m'
Pekerja L.01 OH 0.060 100,000.00 6,000.00
Tukang kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 14,340.00


B BAHAN
List gipsum profil 5-8 cm m 0.900 8,577.00 7,719.30
Tepung Gipsum kg 0.150 3,267.00 490.05

JUMLAH HARGA BAHAN 8,209.35


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,549.35
E Overhead & Profit (10%) 10% x D 2,254.94
F Harga Satuan Pekerjaan (D+E) 24,804.29
XII HARGA SATUAN PEKERJAAN PENGECATAN

A.4.7.1.1 Pengikisan / Pengerokan permukaan cat lama

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 15,390.00


B BAHAN
Soda api Kg 0.050 33,156.00 1,657.80

JUMLAH HARGA BAHAN 1,657.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 17,047.80
E Overhead & Profit (10%) 10% x D 1,704.78
F Harga Satuan Pekerjaan (D+E) 18,752.58

A.4.7.1.2 Pencucian bidang permukaan tembok yang pernah dicat

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 15,390.00


B BAHAN
Sabun kg 0.050 15,885.00 794.25

JUMLAH HARGA BAHAN 794.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,184.25
E Overhead & Profit (10%) 10% x D 1,618.43
F Harga Satuan Pekerjaan (D+E) 17,802.68

A.4.7.1.3 Pengerokan karat pada permukaan baja cara manual

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.150 100,000.00 15,000.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 16,040.00


B BAHAN
Sabun kg 0.050 15,885.00 794.25

JUMLAH HARGA BAHAN 794.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,834.25
E Overhead & Profit (10%) 10% x D 1,683.43
F Harga Satuan Pekerjaan (D+E) 18,517.68
A.4.7.1.4 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.070 100,000.00 7,000.00
Tukang cat L.02 OH 0.009 120,000.00 1,080.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 9,220.00
B BAHAN
Meny Kg 0.200 31,770.00 6,354.00
Plamir kayu Kg 0.150 28,719.00 4,307.85
Cat kayu / besi Kg 0.260 52,209.00 13,574.34
Kuas 3" buah 0.010 12,996.00 129.96
Minyak cat liter 0.030 30,717.00 921.51
Amplas kayu lembar 0.200 4,086.00 817.20
JUMLAH HARGA BAHAN 26,104.86
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 35,324.86
E Overhead & Profit (10%) 10% x D 3,532.49
F Harga Satuan Pekerjaan (D+E) 38,857.35

A.4.7.1.5 Pengecatan bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup )

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.070 100,000.00 7,000.00
Tukang cat L.02 OH 0.105 120,000.00 12,600.00
Kepala tukang L.03 OH 0.004 125,000.00 500.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 20,490.00
B BAHAN
Meny Kg 0.200 31,770.00 6,354.00
Plamir kayu Kg 0.150 28,719.00 4,307.85
Cat kayu / besi Kg 0.350 52,209.00 18,273.15
Kuas 3" buah 0.010 12,996.00 129.96
Minyak cat liter 0.030 30,717.00 921.51
Amplas kayu lembar 0.200 4,086.00 817.20
JUMLAH HARGA BAHAN 30,803.67
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,293.67
E Overhead & Profit (10%) 10% x D 5,129.37
F Harga Satuan Pekerjaan (D+E) 56,423.04

A.4.7.1.6 Pelaburan bidang kayu dengan teak oil

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.040 100,000.00 4,000.00
Tukang cat L.02 OH 0.063 120,000.00 7,560.00
Kepala tukang L.03 OH 0.063 125,000.00 7,875.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 19,825.00
B BAHAN
Minyak begesting liter 0.360 8,721.00 3,139.56
JUMLAH HARGA BAHAN 3,139.56
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 22,964.56
E Overhead & Profit (10%) 10% x D 2,296.46
F Harga Satuan Pekerjaan (D+E) 25,261.02
A.4.7.1.7 Pelaburan bidang kayu dengan pelitur

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.040 100,000.00 4,000.00
Tukang cat L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.016 125,000.00 2,000.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 13,590.00


B BAHAN
Pelitur liter 0.150 53,514.00 8,027.10
Wood filler Kg 0.372 35,307.00 13,134.20
Amplas kayu lembar 2.000 4,086.00 8,172.00

JUMLAH HARGA BAHAN 29,333.30


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,923.30
E Overhead & Profit (10%) 10% x D 4,292.33
F Harga Satuan Pekerjaan (D+E) 47,215.63

A.4.7.1.8 Pelaburan bidang kayu dengan cat residu dan teer

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Mandor L.04 OH 0.006 130,000.00 780.00

JUMLAH TENAGA KERJA 10,780.00


B BAHAN
Teer liter 0.350 40,644.00 14,225.40

JUMLAH HARGA BAHAN 14,225.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,005.40
E Overhead & Profit (10%) 10% x D 2,500.54
F Harga Satuan Pekerjaan (D+E) 27,505.94

A.4.7.1.9 Pelaburan bidang kayu dengan vernis


Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.160 100,000.00 16,000.00
Tukang cat L.02 OH 0.160 120,000.00 19,200.00
Kepala tukang L.03 OH 0.016 125,000.00 2,000.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 37,590.00


B BAHAN
Vernis liter 0.150 48,132.00 7,219.80
Dempul Kg 0.050 27,270.00 1,363.50
Amplas kayu lembar 0.100 4,086.00 408.60

JUMLAH HARGA BAHAN 8,991.90


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 46,581.90
E Overhead & Profit (10%) 10% x D 4,658.19
F Harga Satuan Pekerjaan (D+E) 51,240.09
A.4.7.1.9.1 Melapis meni pada permukaan kayu

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.075 100,000.00 7,500.00
Mandor L.04 OH 0.004 130,000.00 520.00

JUMLAH TENAGA KERJA 8,020.00


B BAHAN
Meny Kg 0.170 31,770.00 5,400.90
Minyak cat liter 0.100 30,717.00 3,071.70

JUMLAH HARGA BAHAN 8,472.60


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 16,492.60
E Overhead & Profit (10%) 10% x D 1,649.26
F Harga Satuan Pekerjaan (D+E) 18,141.86

A.4.7.1.9.2 Mendempul/memplamir dan menggosok kayu

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Tukang kayu L.02 OH 0.110 120,000.00 13,200.00
Kepala tukang L.03 OH 0.011 125,000.00 1,375.00

JUMLAH TENAGA KERJA 14,575.00


B BAHAN
Dempul Kg 0.150 27,270.00 4,090.50
Plamir kayu Kg 0.080 28,719.00 2,297.52
Minyak cat liter 0.100 30,717.00 3,071.70
Amplas kayu lembar 1.000 4,086.00 4,086.00
JUMLAH HARGA BAHAN 13,545.72
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,120.72
E Overhead & Profit (10%) 10% x D 2,812.07
F Harga Satuan Pekerjaan (D+E) 30,932.79

A.4.7.1.10 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat interior kelas I

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala tukang L.03 OH 0.0063 125,000.00 787.50
Mandor L.04 OH 0.0030 130,000.00 390.00

JUMLAH TENAGA KERJA 10,737.50


B BAHAN
Plamir tembok Kg 0.100 11,997.00 1,199.70
Cat dasar Kg 0.100 44,064.00 4,406.40
Cat tembok interior kelas I Kg 0.260 44,064.00 11,456.64

JUMLAH HARGA BAHAN 17,062.74


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 27,800.24
E Overhead & Profit (10%) 10% x D 2,780.02
F Harga Satuan Pekerjaan (D+E) 30,580.26
A.4.7.1.10.1 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat interior kelas II

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala tukang L.03 OH 0.0063 125,000.00 787.50
Mandor L.04 OH 0.0030 130,000.00 390.00

JUMLAH TENAGA KERJA 10,737.50


B BAHAN
Plamir tembok Kg 0.100 11,997.00 1,199.70
Cat dasar Kg 0.100 22,725.00 2,272.50
Cat tembok interior kelas II Kg 0.260 22,725.00 5,908.50

JUMLAH HARGA BAHAN 9,380.70


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 20,118.20
E Overhead & Profit (10%) 10% x D 2,011.82
F Harga Satuan Pekerjaan (D+E) 22,130.02

A.4.7.1.10.2 Pengecatan 1 m2 tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) cat eksterior

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.0630 120,000.00 7,560.00
Kepala tukang L.03 OH 0.0063 125,000.00 787.50
Mandor L.04 OH 0.0030 130,000.00 390.00

JUMLAH TENAGA KERJA 10,737.50


B BAHAN
Plamir tembok Kg 0.100 11,997.00 1,199.70
Cat dasar Kg 0.100 108,612.00 10,861.20
Cat tembok eksterior Kg 0.260 108,612.00 28,239.12
JUMLAH HARGA BAHAN 40,300.02
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 51,037.52
E Overhead & Profit (10%) 10% x D 5,103.75
F Harga Satuan Pekerjaan (D+E) 56,141.27

A.4.7.1.11 Pengecatan bidang tembok lama 2 lapis

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.028 100,000.00 2,800.00
Tukang cat L.02 OH 0.042 120,000.00 5,040.00
Kepala tukang L.03 OH 0.0042 125,000.00 525.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 8,755.00
B BAHAN
Cat tembok eksterior Kg 0.180 108,612.00 19,550.16

JUMLAH HARGA BAHAN 19,550.16


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 28,305.16
E Overhead & Profit (10%) 10% x D 2,830.52
F Harga Satuan Pekerjaan (D+E) 31,135.68

A.4.7.1.15 Pemasangan Wallpaper

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 125,000.00 2,500.00
Mandor L.04 OH 0.0025 130,000.00 325.00

JUMLAH TENAGA KERJA 28,825.00


B BAHAN
Wallpaper 50 cm m' 1.200 63,630.00 76,356.00
Lem kg 0.200 26,541.00 5,308.20

JUMLAH HARGA BAHAN 81,664.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,489.20
E Overhead & Profit (10%) 10% x D 11,048.92
F Harga Satuan Pekerjaan (D+E) 121,538.12

A.4.7.1.16 Pengecatan permukaan baja dengan meny besi

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.0200 100,000.00 2,000.00
Tukang cat L.02 OH 0.2000 120,000.00 24,000.00
Kepala tukang L.03 OH 0.0200 125,000.00 2,500.00
Mandor L.04 OH 0.0025 130,000.00 325.00

JUMLAH TENAGA KERJA 28,825.00


B BAHAN
Meny Kg 0.100 31,770.00 3,177.00
Kuas 1 1/2" buah 0.010 8,487.00 84.87

JUMLAH HARGA BAHAN 3,261.87


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 32,086.87
E Overhead & Profit (10%) 10% x D 3,208.69
F Harga Satuan Pekerjaan (D+E) 35,295.56
dihitung Pengecatan genting

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.200 100,000.00 20,000.00
Tukang cat L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.010 130,000.00 1,300.00

JUMLAH TENAGA KERJA 61,050.00


B BAHAN
Cat genteng Kg 0.425 49,950.00 21,228.75
Minyak cat liter 0.174 30,717.00 5,344.76

JUMLAH HARGA BAHAN 26,573.51


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,623.51
E Overhead & Profit (10%) 10% x D 8,762.35
F Harga Satuan Pekerjaan (D+E) 96,385.86

dihitung Lapis plamir tembok

Harga Satuan
No URAIAN Kode Satuan Koefisien Jumlah Harga (Rp)
(Rp)

1 2 3 4 5 6 7

A TENAGA m3
Pekerja L.01 OH 0.020 100,000.00 2,000.00
Tukang cat L.02 OH 0.030 120,000.00 3,600.00
Kepala tukang L.03 OH 0.003 125,000.00 375.00
Mandor L.04 OH 0.001 130,000.00 130.00

JUMLAH TENAGA KERJA 6,105.00


B BAHAN
Plamir tembok Kg 0.100 11,997.00 1,199.70
Amplas kayu lembar 4,086.00 -

JUMLAH HARGA BAHAN 1,199.70


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 7,304.70
E Overhead & Profit (10%) 10% x D 730.47
F Harga Satuan Pekerjaan (D+E) 8,035.17
XI HARGA SATUAN PEKERJAAN KUNCI DAN KACA

A.4.6.2.2 Pemasangan kunci tanam kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang kayu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 59,815.00


B BAHAN
Kunci Tanam Kelas I buah 1.000 181,800.00 181,800.00

JUMLAH HARGA BAHAN 181,800.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 241,615.00
E Overhead & Profit (10%) 10% x D 24,161.50
F Harga Satuan Pekerjaan (D+E) 265,776.50

A.4.6.2.2.1 Pemasangan kunci tanam kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang kayu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 59,815.00


B BAHAN
Kunci Tanam Kelas II buah 1.000 118,170.00 118,170.00

JUMLAH HARGA BAHAN 118,170.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,985.00
E Overhead & Profit (10%) 10% x D 17,798.50
F Harga Satuan Pekerjaan (D+E) 195,783.50

A.4.6.2.4 Pemasangan kunci silinder

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.005 100,000.00 500.00
Tukang kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 67,140.00
B BAHAN
Kunci silinder kamar mandi buah 1.000 90,000.00 90,000.00

JUMLAH HARGA BAHAN 90,000.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 157,140.00
E Overhead & Profit (10%) 10% x D 15,714.00
F Harga Satuan Pekerjaan (D+E) 172,854.00
A.4.6.2.5 Pemasangan engsel pintu

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Engsel pintu buah 1.000 16,506.00 16,506.00

JUMLAH HARGA BAHAN 16,506.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 37,985.00
E Overhead & Profit (10%) 10% x D 3,798.50
F Harga Satuan Pekerjaan (D+E) 41,783.50

A.4.6.2.6 Pemasangan engsel jendela

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Engsel jendela buah 1.000 12,510.00 12,510.00

JUMLAH HARGA BAHAN 12,510.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,989.00
E Overhead & Profit (10%) 10% x D 3,398.90
F Harga Satuan Pekerjaan (D+E) 37,387.90

A.4.6.2.7 Pemasangan engsel angin

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.100 100,000.00 10,000.00
Tukang kayu L.02 OH 0.200 120,000.00 24,000.00
Kepala tukang L.03 OH 0.020 125,000.00 2,500.00
Mandor L.04 OH 0.0005 130,000.00 65.00

JUMLAH TENAGA KERJA 36,565.00


B BAHAN
Engsel angin buah 1.000 15,993.00 15,993.00

JUMLAH HARGA BAHAN 15,993.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 52,558.00
E Overhead & Profit (10%) 10% x D 5,255.80
F Harga Satuan Pekerjaan (D+E) 57,813.80
A.4.6.2.8 Pemasangan spring knife

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 22,415.00


B BAHAN
Spring Knife buah 1.000 19,701.00 19,701.00

JUMLAH HARGA BAHAN 19,701.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 42,116.00
E Overhead & Profit (10%) 10% x D 4,211.60
F Harga Satuan Pekerjaan (D+E) 46,327.60

A.4.6.2.9 Pemasangan kait angin

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 22,415.00


B BAHAN
Kait angin buah 1.000 11,358.00 11,358.00

JUMLAH HARGA BAHAN 11,358.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 33,773.00
E Overhead & Profit (10%) 10% x D 3,377.30
F Harga Satuan Pekerjaan (D+E) 37,150.30

A.4.6.2.10 Pemasangan door closer

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Tukang kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 71,640.00


B BAHAN
Door closer buah 1.000 249,930.00 249,930.00

JUMLAH HARGA BAHAN 249,930.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 321,570.00
E Overhead & Profit (10%) 10% x D 32,157.00
F Harga Satuan Pekerjaan (D+E) 353,727.00
A.4.6.2.12 Pemasangan door holder

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.050 100,000.00 5,000.00
Tukang kayu L.02 OH 0.500 120,000.00 60,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.003 130,000.00 390.00

JUMLAH TENAGA KERJA 71,640.00


B BAHAN
Door Holder buah 1.000 22,905.00 22,905.00

JUMLAH HARGA BAHAN 22,905.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 94,545.00
E Overhead & Profit (10%) 10% x D 9,454.50
F Harga Satuan Pekerjaan (D+E) 103,999.50

A.4.6.2.13 Pemasangan door stops

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.010 100,000.00 1,000.00
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 14,900.00


B BAHAN
Door stops buah 1.000 34,722.00 34,722.00

JUMLAH HARGA BAHAN 34,722.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,622.00
E Overhead & Profit (10%) 10% x D 4,962.20
F Harga Satuan Pekerjaan (D+E) 54,584.20

A.4.6.2.14 Pemasangan rel pintu sorong / geser

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.600 100,000.00 60,000.00
Tukang kayu L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.600 125,000.00 75,000.00
Mandor L.04 OH 0.003 130,000.00 390.00
JUMLAH TENAGA KERJA 142,590.00
B BAHAN
Rel pintu geser buah 1.000 148,140.00 148,140.00

JUMLAH HARGA BAHAN 148,140.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 290,730.00
E Overhead & Profit (10%) 10% x D 29,073.00
F Harga Satuan Pekerjaan (D+E) 319,803.00
A.4.6.2.15.1 Pemasangan grendel ukuran besar

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00

JUMLAH TENAGA KERJA 13,250.00


B BAHAN
Grendel ukuran besar buah 1.000 36,360.00 36,360.00

JUMLAH HARGA BAHAN 36,360.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 49,610.00
E Overhead & Profit (10%) 10% x D 4,961.00
F Harga Satuan Pekerjaan (D+E) 54,571.00

A.4.6.2.15.2 Pemasangan grendel ukuran kecil

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Tukang kayu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00

JUMLAH TENAGA KERJA 13,250.00


B BAHAN
Grendel ukuran kecil buah 1.000 10,251.00 10,251.00

JUMLAH HARGA BAHAN 10,251.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 23,501.00
E Overhead & Profit (10%) 10% x D 2,350.10
F Harga Satuan Pekerjaan (D+E) 25,851.10

A.4.6.2.16. Pemasangan kaca tebal 3 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Kaca Bening 3 mm m2 1.100 57,663.00 63,429.30
Sealant tube 0.050 76,788.00 3,839.40
JUMLAH HARGA BAHAN 67,268.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 88,747.70
E Overhead & Profit (10%) 10% x D 8,874.77
F Harga Satuan Pekerjaan (D+E) 97,622.47
A.4.6.2.16.1 Pemasangan kaca tebal 3 mm dg kisi kisi

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.250 100,000.00 25,000.00
Tukang kayu L.02 OH 0.250 120,000.00 30,000.00
Kepala tukang L.03 OH 0.025 125,000.00 3,125.00
Mandor L.04 OH 0.013 130,000.00 1,690.00

JUMLAH TENAGA KERJA 59,815.00


B BAHAN
Kaca Bening 3 mm m2 1.200 57,663.00 69,195.60
Sealant tube 0.050 76,788.00 3,839.40

JUMLAH HARGA BAHAN 73,035.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 132,850.00
E Overhead & Profit (10%) 10% x D 13,285.00
F Harga Satuan Pekerjaan (D+E) 146,135.00

A.4.6.2.17 Pemasangan kaca tebal 5 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Kaca bening 5 mm m2 1.100 73,584.00 80,942.40
Sealant tube 0.050 76,788.00 3,839.40

JUMLAH HARGA BAHAN 84,781.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 106,260.80
E Overhead & Profit (10%) 10% x D 10,626.08
F Harga Satuan Pekerjaan (D+E) 116,886.88

A.4.6.2.18 Pemasangan kaca tebal 8 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.017 100,000.00 1,700.00
Tukang kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.0009 130,000.00 117.00
JUMLAH TENAGA KERJA 24,342.00
B BAHAN
Kaca bening 8 mm m2 1.100 142,236.00 156,459.60
Sealant tube 0.070 76,788.00 5,375.16

JUMLAH HARGA BAHAN 161,834.76


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 186,176.76
E Overhead & Profit (10%) 10% x D 18,617.68
F Harga Satuan Pekerjaan (D+E) 204,794.44
A.4.6.2.20 Pemasangan kaca cermin tebal 5 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.008 130,000.00 1,040.00

JUMLAH TENAGA KERJA 22,415.00


B BAHAN
Kaca cermin 5 mm m2 1.100 139,473.00 153,420.30

JUMLAH HARGA BAHAN 153,420.30


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 175,835.30
E Overhead & Profit (10%) 10% x D 17,583.53
F Harga Satuan Pekerjaan (D+E) 193,418.83

A.4.6.2.24 Pemasangan kaca rayban tebal 5 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Kaca rayband 5 mm m2 1.100 92,790.00 102,069.00
Sealant tube 0.050 76,788.00 3,839.40

JUMLAH HARGA BAHAN 105,908.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 127,387.40
E Overhead & Profit (10%) 10% x D 12,738.74
F Harga Satuan Pekerjaan (D+E) 140,126.14

A.4.6.2.25 Pemasangan kaca rayband tebal 8 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.017 100,000.00 1,700.00
Tukang kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.0009 130,000.00 117.00

JUMLAH TENAGA KERJA 24,342.00


B BAHAN
Kaca rayband 8 mm m2 1.100 174,015.00 191,416.50
Sealant tube 0.070 76,788.00 5,375.16

JUMLAH HARGA BAHAN 196,791.66


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 221,133.66
E Overhead & Profit (10%) 10% x D 22,113.37
F Harga Satuan Pekerjaan (D+E) 243,247.03

A.4.6.2.26 Pemasangan kaca jeruk tebal 3 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Kaca jeruk 3 mm m2 1.100 81,810.00 89,991.00
Sealant tube 0.050 76,788.00 3,839.40

JUMLAH HARGA BAHAN 93,830.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 115,309.40
E Overhead & Profit (10%) 10% x D 11,530.94
F Harga Satuan Pekerjaan (D+E) 126,840.34

A.4.6.2.27 Pemasangan kaca jeruk tebal 5 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.017 100,000.00 1,700.00
Tukang kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.0009 130,000.00 117.00

JUMLAH TENAGA KERJA 24,342.00


B BAHAN
Kaca jeruk 5 mm m2 1.100 168,489.00 185,337.90
Sealant tube 0.070 76,788.00 5,375.16

JUMLAH HARGA BAHAN 190,713.06


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 215,055.06
E Overhead & Profit (10%) 10% x D 21,505.51
F Harga Satuan Pekerjaan (D+E) 236,560.57
A.4.6.2.28 Pemasangan kaca es tebal 3 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.015 100,000.00 1,500.00
Tukang kayu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.0008 130,000.00 104.00

JUMLAH TENAGA KERJA 21,479.00


B BAHAN
Kaca es 3 mm m2 1.100 77,220.00 84,942.00
Sealant tube 0.050 76,788.00 3,839.40

JUMLAH HARGA BAHAN 88,781.40


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 110,260.40
E Overhead & Profit (10%) 10% x D 11,026.04
F Harga Satuan Pekerjaan (D+E) 121,286.44
A.4.6.2.29 Pemasangan kaca es tebal 5 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.017 100,000.00 1,700.00
Tukang kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.0009 130,000.00 117.00

JUMLAH TENAGA KERJA 24,342.00


B BAHAN
Kaca es 5 mm m2 1.100 109,080.00 119,988.00
Sealant tube 0.070 76,788.00 5,375.16

JUMLAH HARGA BAHAN 125,363.16


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 149,705.16
E Overhead & Profit (10%) 10% x D 14,970.52
F Harga Satuan Pekerjaan (D+E) 164,675.68

A.4.6.2.30 Pemasangan kaca tempered 12 mm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m2
Pekerja L.01 OH 0.017 100,000.00 1,700.00
Tukang kayu L.02 OH 0.170 120,000.00 20,400.00
Kepala tukang L.03 OH 0.017 125,000.00 2,125.00
Mandor L.04 OH 0.0009 130,000.00 117.00

JUMLAH TENAGA KERJA 24,342.00


B BAHAN
Kaca tempered 12 mm m2 1.100 1,499,850.00 1,649,835.00
Sealant tube 0.070 76,788.00 5,375.16

JUMLAH HARGA BAHAN 1,655,210.16


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,679,552.16
E Overhead & Profit (10%) 10% x D 167,955.22
F Harga Satuan Pekerjaan (D+E) 1,847,507.38
XIII HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG

A.5.1.1.1 Pemasangan kloset duduk/monoblok kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.300 100,000.00 330,000.00
Tukang batu L.02 OH 1.100 120,000.00 132,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 484,050.00
B BAHAN
Kloset duduk/Monoblok kelas I buah 1.060 2,227,050.00 2,360,673.00
Perlengkapan ls 133,623.00 133,623.00

JUMLAH HARGA BAHAN 2,494,296.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,978,346.00
E Overhead & Profit (10%) 10% x D 297,834.60
F Harga Satuan Pekerjaan (D+E) 3,276,180.60

A.5.1.1.1.1 Pemasangan kloset duduk/monoblok kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.300 100,000.00 330,000.00
Tukang batu L.02 OH 1.100 120,000.00 132,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 484,050.00
B BAHAN
Kloset duduk/Monoblok kelas II buah 1.0601,363,500.00 1,445,310.00
Perlengkapan ls 81,810.00 81,810.00
JUMLAH HARGA BAHAN 1,527,120.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 2,011,170.00
E Overhead & Profit (10%) 10% x D 201,117.00
F Harga Satuan Pekerjaan (D+E) 2,212,287.00

A.5.1.1.2 Memasang kloset jongkok porselen kelas I

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang batu L.02 OH 1.500 120,000.00 180,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 319,550.00
B BAHAN
Kloset porselin jongkok kelas I buah 1.000 227,250.00 227,250.00
Semen PC. Kg 6.000 1,180.00 7,080.00
Pasir pasang m3 0.010 195,000.00 1,950.00
JUMLAH HARGA BAHAN 236,280.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 555,830.00
E Overhead & Profit (10%) 10% x D 55,583.00
F Harga Satuan Pekerjaan (D+E) 611,413.00
A.5.1.1.2.1 Memasang kloset jongkok porselen kelas II

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang batu L.02 OH 1.500 120,000.00 180,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.160 130,000.00 20,800.00
JUMLAH TENAGA KERJA 319,550.00
B BAHAN
Kloset porselin jongkok kelas II buah 1.000 125,145.00 125,145.00
Semen PC. Kg 6.000 1,180.00 7,080.00
Pasir pasang m3 0.010 195,000.00 1,950.00

JUMLAH HARGA BAHAN 134,175.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 453,725.00
E Overhead & Profit (10%) 10% x D 45,372.50
F Harga Satuan Pekerjaan (D+E) 499,097.50

A.5.1.1.4 Pemasangan urinoir

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.000 100,000.00 100,000.00
Tukang batu L.02 OH 1.000 120,000.00 120,000.00
Kepala tukang L.03 OH 0.100 125,000.00 12,500.00
Mandor L.04 OH 0.050 130,000.00 6,500.00
JUMLAH TENAGA KERJA 239,000.00
B BAHAN
Urinoir buah 1.000 909,000.00 909,000.00
Semen PC. Kg 6.000 1,180.00 7,080.00
Pasir pasang m3 0.010 195,000.00 1,950.00
Perlengkapan % 30.000 909,000.00 272,700.00
JUMLAH HARGA BAHAN 1,190,730.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,429,730.00
E Overhead & Profit (10%) 10% x D 142,973.00
F Harga Satuan Pekerjaan (D+E) 1,572,703.00

A.5.1.1.5 Pemasangan wastafel

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.200 100,000.00 120,000.00
Tukang batu L.02 OH 1.450 120,000.00 174,000.00
Kepala tukang L.03 OH 0.150 125,000.00 18,750.00
Mandor L.04 OH 0.060 130,000.00 7,800.00
JUMLAH TENAGA KERJA 320,550.00
B BAHAN
Wastafel buah 1.200 409,050.00 490,860.00
Semen PC. Kg 6.000 1,180.00 7,080.00
Pasir pasang m3 0.010 195,000.00 1,950.00
Perlengkapan % 12.000 409,050.00 49,086.00
JUMLAH HARGA BAHAN 548,976.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 869,526.00
E Overhead & Profit (10%) 10% x D 86,952.60
F Harga Satuan Pekerjaan (D+E) 956,478.60
A.5.1.1.7 Pemasangan bak mandi fibreglass vol 0,3 m3

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.000 100,000.00 300,000.00
Tukang batu L.02 OH 4.500 120,000.00 540,000.00
Kepala tukang L.03 OH 0.050 125,000.00 6,250.00
Mandor L.04 OH 0.900 130,000.00 117,000.00
JUMLAH TENAGA KERJA 963,250.00
B BAHAN
Bak fiberglass sudut 0,3 m3 buah 1.000 318,150.00 318,150.00
Perlengkapan ls 12%xbak 38,178.00

JUMLAH HARGA BAHAN 356,328.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,319,578.00
E Overhead & Profit (10%) 10% x D 131,957.80
F Harga Satuan Pekerjaan (D+E) 1,451,535.80

A.5.1.1.8 Pemasangan bak mandi batu bata volume 0,3 m3

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 6.000 100,000.00 600,000.00
Tukang batu L.02 OH 3.000 120,000.00 360,000.00
Kepala tukang L.03 OH 0.300 125,000.00 37,500.00
Mandor L.04 OH 0.030 130,000.00 3,900.00
JUMLAH TENAGA KERJA 1,001,400.00
B BAHAN
Batu Bata buah 150.000 603.00 90,450.00
Semen PC. Kg 120.000 1,180.00 141,600.00
Pasir pasang m3 0.300 195,000.00 58,500.00
Keramik dinding 10 x 20 cm kelas I buah 180.000 1,359.00 244,620.00
Semen Warna Kg 6.000 11,700.00 70,200.00
JUMLAH HARGA BAHAN 605,370.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 1,606,770.00
E Overhead & Profit (10%) 10% x D 160,677.00
F Harga Satuan Pekerjaan (D+E) 1,767,447.00

A.5.1.1.10 Pemasangan bak air fiberglass vol 1 m3

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.000 100,000.00 300,000.00
Tukang batu L.02 OH 4.500 120,000.00 540,000.00
Kepala tukang L.03 OH 0.900 125,000.00 112,500.00
Mandor L.04 OH 0.900 130,000.00 117,000.00
JUMLAH TENAGA KERJA 1,069,500.00
B BAHAN
Tangki fiber kapasitas 1 m3 buah 1.120 2,772,450.00 3,105,144.00
Perlengkapan ls 12%xbak 332,694.00

JUMLAH HARGA BAHAN 3,437,838.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 4,507,338.00
E Overhead & Profit (10%) 10% x D 450,733.80
F Harga Satuan Pekerjaan (D+E) 4,958,071.80
A.5.1.1.12 Pemasangan bak cuci piring stainlessteel 1 bak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.030 100,000.00 3,000.00
Tukang batu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 44,700.00
B BAHAN
Bak cuci Stainles steel 1 bak buah 1.000 222,660.00 222,660.00

JUMLAH HARGA BAHAN 222,660.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 267,360.00
E Overhead & Profit (10%) 10% x D 26,736.00
F Harga Satuan Pekerjaan (D+E) 294,096.00

A.5.1.1.12.1 Pemasangan bak cuci piring stainlessteel 2 bak

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.030 100,000.00 3,000.00
Tukang batu L.02 OH 0.300 120,000.00 36,000.00
Kepala tukang L.03 OH 0.030 125,000.00 3,750.00
Mandor L.04 OH 0.015 130,000.00 1,950.00
JUMLAH TENAGA KERJA 44,700.00
B BAHAN
Bak cuci Stainles steel 2 bak buah 1.000 395,370.00 395,370.00

JUMLAH HARGA BAHAN 395,370.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 440,070.00
E Overhead & Profit (10%) 10% x D 44,007.00
F Harga Satuan Pekerjaan (D+E) 484,077.00

A.5.1.1.14 Pemasangan floor drain plastik

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.010 100,000.00 1,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 14,900.00
B BAHAN
Floor drain plastik buah 1.000 15,849.00 15,849.00

JUMLAH HARGA BAHAN 15,849.00


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 30,749.00
E Overhead & Profit (10%) 10% x D 3,074.90
F Harga Satuan Pekerjaan (D+E) 33,823.90
A.5.1.1.14.1 Pemasangan floor drain stainles

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.010 100,000.00 1,000.00
Tukang batu L.02 OH 0.100 120,000.00 12,000.00
Kepala tukang L.03 OH 0.010 125,000.00 1,250.00
Mandor L.04 OH 0.005 130,000.00 650.00
JUMLAH TENAGA KERJA 14,900.00
B BAHAN
Floor drain stainles buah 1.000 41,445.00 41,445.00
JUMLAH HARGA BAHAN 41,445.00
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 56,345.00
E Overhead & Profit (10%) 10% x D 5,634.50
F Harga Satuan Pekerjaan (D+E) 61,979.50

A.5.1.1.15 Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 2.160 100,000.00 216,000.00
Tukang batu L.02 OH 0.720 120,000.00 86,400.00
Kepala tukang L.03 OH 0.072 125,000.00 9,000.00
Mandor L.04 OH 0.011 130,000.00 1,430.00
JUMLAH TENAGA KERJA 312,830.00
B BAHAN
Batu Bata buah 40.000 603.00 24,120.00
Semen PC. Kg 44.000 1,180.00 51,920.00
Pasir pasang m3 0.070 195,000.00 13,650.00
Pasir beton per m3 m3 0.060 227,700.00 13,662.00
Kerikil sungai ayak tanpa pasir m3 0.070 235,800.00 16,506.00
Besi beton kg 1.600 9,747.00 15,595.20
JUMLAH HARGA BAHAN 135,453.20
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 448,283.20
E Overhead & Profit (10%) 10% x D 44,828.32
F Harga Satuan Pekerjaan (D+E) 493,111.52

A.5.1.1.16 Pemasangan bak kontrol pasangan bata 45x45 tinggi 50cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.200 100,000.00 320,000.00
Tukang batu L.02 OH 1.150 120,000.00 138,000.00
Kepala tukang L.03 OH 0.011 125,000.00 1,375.00
Mandor L.04 OH 0.016 130,000.00 2,080.00
JUMLAH TENAGA KERJA 461,455.00
B BAHAN
Batu Bata buah 70.000 603.00 42,210.00
Semen PC. Kg 77.000 1,180.00 90,860.00
Pasir pasang m3 0.130 195,000.00 25,350.00
Pasir beton per m3 m3 0.090 227,700.00 20,493.00
Kerikil sungai ayak tanpa pasir m3 0.020 235,800.00 4,716.00
Besi beton kg 2.600 9,747.00 25,342.20

JUMLAH HARGA BAHAN 208,971.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 670,426.20
E Overhead & Profit (10%) 10% x D 67,042.62
F Harga Satuan Pekerjaan (D+E) 737,468.82

A.5.1.1.17 Pemasangan bak kontrol pasangan bata 60x60 tinggi 65cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 3.200 100,000.00 320,000.00
Tukang batu L.02 OH 1.150 120,000.00 138,000.00
Kepala tukang L.03 OH 0.011 125,000.00 1,375.00
Mandor L.04 OH 0.016 130,000.00 2,080.00
JUMLAH TENAGA KERJA 461,455.00
B BAHAN
Batu Bata buah 123.000 603.00 74,169.00
Semen PC. Kg 114.000 1,180.00 134,520.00
Pasir pasang m3 0.184 195,000.00 35,880.00
Pasir beton per m3 m3 0.120 227,700.00 27,324.00
Kerikil sungai ayak tanpa pasir m3 0.033 235,800.00 7,781.40
Besi beton kg 4.850 9,747.00 47,272.95
JUMLAH HARGA BAHAN 326,947.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 788,402.35
E Overhead & Profit (10%) 10% x D 78,840.24
F Harga Satuan Pekerjaan (D+E) 867,242.59

A.5.1.1.18 Pemasangan pipa galvanis diameter 1/2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" m 1.200 25,812.00 30,974.40
Perlengkapan ls 35%xpipa 9,034.20 9,034.20
JUMLAH HARGA BAHAN 40,008.60
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 60,843.60
E Overhead & Profit (10%) 10% x D 6,084.36
F Harga Satuan Pekerjaan (D+E) 66,927.96
A.5.1.1.19 Pemasangan kran air diameter 1/2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.010 100,000.00 1,000.00
Tukang pipa L.02 OH 0.040 120,000.00 4,800.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 11,450.00


B BAHAN
Kran air 1/2" buah 1.000 18,180.00 18,180.00
Seal tape buah 0.025 4,950.00 123.75

JUMLAH HARGA BAHAN 18,303.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 29,753.75
E Overhead & Profit (10%) 10% x D 2,975.38
F Harga Satuan Pekerjaan (D+E) 32,729.13
A.5.1.1.19.1 Pemasangan kran air diameter 3/4"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.010 100,000.00 1,000.00
Tukang pipa L.02 OH 0.040 120,000.00 4,800.00
Kepala tukang L.03 OH 0.040 125,000.00 5,000.00
Mandor L.04 OH 0.005 130,000.00 650.00

JUMLAH TENAGA KERJA 11,450.00


B BAHAN
Kran air 3/4" buah 1.000 27,270.00 27,270.00
Seal tape buah 0.025 4,950.00 123.75

JUMLAH HARGA BAHAN 27,393.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 38,843.75
E Overhead & Profit (10%) 10% x D 3,884.38
F Harga Satuan Pekerjaan (D+E) 42,728.13

A.5.1.1.20 Pemasangan pipa galvanis diameter 3/4"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" m 1.200 32,355.00 38,826.00
Perlengkapan ls 35%xpipa 11,324.25 11,324.25

JUMLAH HARGA BAHAN 50,150.25


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 70,985.25
E Overhead & Profit (10%) 10% x D 7,098.53
F Harga Satuan Pekerjaan (D+E) 78,083.78

A.5.1.1.21 Pemasangan pipa galvanis diameter 1"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 25 mm 1" m 1.200 45,738.00 54,885.60
Perlengkapan ls 35%xpipa 16,008.30 16,008.30

JUMLAH HARGA BAHAN 70,893.90


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 91,728.90
E Overhead & Profit (10%) 10% x D 9,172.89
F Harga Satuan Pekerjaan (D+E) 100,901.79
A.5.1.1.22 Pemasangan pipa galvanis diameter 1¼"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 30 mm 1 1/4" m 1.200 57,150.00 68,580.00
Perlengkapan ls 35%xpipa 20,002.50 20,002.50

JUMLAH HARGA BAHAN 88,582.50


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 109,417.50
E Overhead & Profit (10%) 10% x D 10,941.75
F Harga Satuan Pekerjaan (D+E) 120,359.25

A.5.1.1.22.1 Pemasangan pipa galvanis diameter 1½"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" m 1.200 77,805.00 93,366.00
Perlengkapan ls 35%xpipa 27,231.75 27,231.75

JUMLAH HARGA BAHAN 120,597.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 141,432.75
E Overhead & Profit (10%) 10% x D 14,143.28
F Harga Satuan Pekerjaan (D+E) 155,576.03

A.5.1.1.22.2 Pemasangan pipa galvanis diameter 2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 50 mm 2" m 1.200 106,164.00 127,396.80
Perlengkapan ls 35%xpipa 37,157.40 37,157.40

JUMLAH HARGA BAHAN 164,554.20


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 185,389.20
E Overhead & Profit (10%) 10% x D 18,538.92
F Harga Satuan Pekerjaan (D+E) 203,928.12
A.5.1.1.22.3 Pemasangan pipa galvanis diameter 2½"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 50 mm 2,5" m 1.200 131,985.00 158,382.00
Perlengkapan ls 35%xpipa 46,194.75 46,194.75

JUMLAH HARGA BAHAN 204,576.75


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 225,411.75
E Overhead & Profit (10%) 10% x D 22,541.18
F Harga Satuan Pekerjaan (D+E) 247,952.93

A.5.1.1.23 Pemasangan pipa galvanis diameter 3"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 75 mm 3" m 1.200 174,303.00 209,163.60
Perlengkapan ls 35%xpipa 61,006.05 61,006.05

JUMLAH HARGA BAHAN 270,169.65


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 291,004.65
E Overhead & Profit (10%) 10% x D 29,100.47
F Harga Satuan Pekerjaan (D+E) 320,105.12

A.5.1.1.24 Pemasangan pipa galvanis diameter 4"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.027 130,000.00 3,510.00
JUMLAH TENAGA KERJA 20,835.00
B BAHAN
Pipa besi Galvanis ( GIP ) DN 100 mm 4" m 1.200 232,776.00 279,331.20
Perlengkapan ls 35%xpipa 81,471.60 81,471.60
JUMLAH HARGA BAHAN 360,802.80
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 381,637.80
E Overhead & Profit (10%) 10% x D 38,163.78
F Harga Satuan Pekerjaan (D+E) 419,801.58
A.5.1.1.25 Pemasangan pipa PVC tipe AW diameter 1/2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.036 100,000.00 3,600.00
Tukang pipa L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 130,000.00 234.00
JUMLAH TENAGA KERJA 11,784.00
B BAHAN
Pipa PVC 10 mm ( 1/2 ) " AW m 1.200 4,581.00 5,497.20
Perlengkapan ls 35%xpipa 1,603.35 1,603.35

JUMLAH HARGA BAHAN 7,100.55


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 18,884.55
E Overhead & Profit (10%) 10% x D 1,888.46
F Harga Satuan Pekerjaan (D+E) 20,773.00

A.5.1.1.26 Pemasangan pipa PVC tipe AW diameter 3/4"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.036 100,000.00 3,600.00
Tukang pipa L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 130,000.00 234.00
JUMLAH TENAGA KERJA 11,784.00
B BAHAN
Pipa PVC 20 mm ( 3/4 ) " AW m 1.200 6,174.00 7,408.80
Perlengkapan ls 35%xpipa 2,160.90 2,160.90

JUMLAH HARGA BAHAN 9,569.70


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 21,353.70
E Overhead & Profit (10%) 10% x D 2,135.37
F Harga Satuan Pekerjaan (D+E) 23,489.07

A.5.1.1.27 Pemasangan pipa PVC tipe AW diameter 1"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.036 100,000.00 3,600.00
Tukang pipa L.02 OH 0.060 120,000.00 7,200.00
Kepala tukang L.03 OH 0.006 125,000.00 750.00
Mandor L.04 OH 0.002 130,000.00 234.00
JUMLAH TENAGA KERJA 11,784.00
B BAHAN
Pipa PVC 25 mm ( 1 ) " AW m 1.200 8,577.00 10,292.40
Perlengkapan ls 35%xpipa 3,001.95 3,001.95
JUMLAH HARGA BAHAN 13,294.35
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 25,078.35
E Overhead & Profit (10%) 10% x D 2,507.84
F Harga Satuan Pekerjaan (D+E) 27,586.18
A.5.1.1.28 Pemasangan pipa PVC tipe AW diameter 1½"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.003 130,000.00 351.00
JUMLAH TENAGA KERJA 17,676.00
B BAHAN
Pipa PVC 40 mm ( 1 1/2 ) " AW m 1.200 14,976.00 17,971.20
Perlengkapan ls 35%xpipa 5,241.60 5,241.60

JUMLAH HARGA BAHAN 23,212.80


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 40,888.80
E Overhead & Profit (10%) 10% x D 4,088.88
F Harga Satuan Pekerjaan (D+E) 44,977.68

A.5.1.1.29 Pemasangan pipa PVC tipe AW diameter 2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.054 100,000.00 5,400.00
Tukang pipa L.02 OH 0.090 120,000.00 10,800.00
Kepala tukang L.03 OH 0.009 125,000.00 1,125.00
Mandor L.04 OH 0.003 130,000.00 351.00
JUMLAH TENAGA KERJA 17,676.00
B BAHAN
Pipa PVC 50 mm ( 2 ) " AW m 1.200 19,413.00 23,295.60
Perlengkapan ls 35%xpipa 6,794.55 6,794.55

JUMLAH HARGA BAHAN 30,090.15


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 47,766.15
E Overhead & Profit (10%) 10% x D 4,776.62
F Harga Satuan Pekerjaan (D+E) 52,542.76

A.5.1.1.30 Pemasangan pipa PVC tipe AW diameter 2 1/2"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.081 100,000.00 8,100.00
Tukang pipa L.02 OH 0.135 120,000.00 16,200.00
Kepala tukang L.03 OH 0.0135 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 526.50
JUMLAH TENAGA KERJA 26,514.00
B BAHAN
Pipa PVC 64 mm ( 2 1/2) " AW m 1.200 31,122.00 37,346.40
Perlengkapan ls 35%xpipa 10,892.70 10,892.70
JUMLAH HARGA BAHAN 48,239.10
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 74,753.10
E Overhead & Profit (10%) 10% x D 7,475.31
F Harga Satuan Pekerjaan (D+E) 82,228.41
A.5.1.1.31 Pemasangan pipa PVC tipe AW diameter 3"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.081 100,000.00 8,100.00
Tukang pipa L.02 OH 0.135 120,000.00 16,200.00
Kepala tukang L.03 OH 0.0135 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 526.50
JUMLAH TENAGA KERJA 26,514.00
B BAHAN
Pipa PVC 80 mm ( 3 ) " AW m 1.200 37,809.00 45,370.80
Perlengkapan ls 35%xpipa 13,233.15 13,233.15

JUMLAH HARGA BAHAN 58,603.95


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 85,117.95
E Overhead & Profit (10%) 10% x D 8,511.80
F Harga Satuan Pekerjaan (D+E) 93,629.75

A.5.1.1.32 Pemasangan pipa PVC tipe AW diameter 4"

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.081 100,000.00 8,100.00
Tukang pipa L.02 OH 0.135 120,000.00 16,200.00
Kepala tukang L.03 OH 0.0135 125,000.00 1,687.50
Mandor L.04 OH 0.004 130,000.00 526.50
JUMLAH TENAGA KERJA 26,514.00
B BAHAN
Pipa PVC 100 mm ( 4 ) " AW m 1.200 61,659.00 73,990.80
Perlengkapan ls 35%xpipa 21,580.65 21,580.65

JUMLAH HARGA BAHAN 95,571.45


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 122,085.45
E Overhead & Profit (10%) 10% x D 12,208.55
F Harga Satuan Pekerjaan (D+E) 134,294.00

A.5.1.1.35 Pemasangan pipa beton diameter 20 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.140 100,000.00 14,000.00
Tukang batu L.02 OH 0.070 120,000.00 8,400.00
Kepala tukang L.03 OH 0.007 125,000.00 875.00
Mandor L.04 OH 0.007 130,000.00 910.00
JUMLAH TENAGA KERJA 24,185.00
B BAHAN
Gorong - gorong buis beton dia. 20 cm m' 1.100 40,860.00 44,946.00
Batu Bata buah 0.027 603.00 16.28
Semen PC. Kg 3.920 1,180.00 4,625.60
Pasir pasang m3 0.056 195,000.00 10,920.00
Pasir urug m3 0.024 127,800.00 3,067.20

JUMLAH HARGA BAHAN 63,575.08


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 87,760.08
E Overhead & Profit (10%) 10% x D 8,776.01
F Harga Satuan Pekerjaan (D+E) 96,536.09
A.5.1.1.36 Pemasangan pipa beton diameter 30 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.380 100,000.00 38,000.00
Tukang batu L.02 OH 0.190 120,000.00 22,800.00
Kepala tukang L.03 OH 0.019 125,000.00 2,375.00
Mandor L.04 OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 65,645.00
B BAHAN
Gorong - gorong buis beton dia. 30 cm m' 1.100 54,540.00 59,994.00
Batu Bata buah 0.550 603.00 331.65
Semen PC. Kg 10.300 1,180.00 12,154.00
Pasir pasang m3 0.061 195,000.00 11,895.00
Pasir urug m3 0.069 127,800.00 8,818.20

JUMLAH HARGA BAHAN 93,192.85


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 158,837.85
E Overhead & Profit (10%) 10% x D 15,883.79
F Harga Satuan Pekerjaan (D+E) 174,721.64

A.5.1.1.37 Pemasangan pipa beton diameter 60 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.380 100,000.00 38,000.00
Tukang batu L.02 OH 0.190 120,000.00 22,800.00
Kepala tukang L.03 OH 0.019 125,000.00 2,375.00
Mandor L.04 OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 65,645.00
B BAHAN
Gorong - gorong buis beton dia. 60 cm m' 1.100 123,111.00 135,422.10
Batu Bata buah 0.550 603.00 331.65
Semen PC. Kg 10.300 1,180.00 12,154.00
Pasir pasang m3 0.061 195,000.00 11,895.00
Pasir urug m3 0.069 127,800.00 8,818.20

JUMLAH HARGA BAHAN 168,620.95


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 234,265.95
E Overhead & Profit (10%) 10% x D 23,426.60
F Harga Satuan Pekerjaan (D+E) 257,692.55

A.5.1.1.38 Pemasangan pipa beton diameter 80 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.380 100,000.00 38,000.00
Tukang batu L.02 OH 0.190 120,000.00 22,800.00
Kepala tukang L.03 OH 0.019 125,000.00 2,375.00
Mandor L.04 OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 65,645.00
B BAHAN
Gorong - gorong buis beton dia. 80 cm m' 1.100 181,800.00 199,980.00
Batu Bata buah 0.550 603.00 331.65
Semen PC. Kg 10.300 1,180.00 12,154.00
Pasir pasang m3 0.061 195,000.00 11,895.00
Pasir urug m3 0.069 127,800.00 8,818.20
JUMLAH HARGA BAHAN 233,178.85
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 298,823.85
E Overhead & Profit (10%) 10% x D 29,882.39
F Harga Satuan Pekerjaan (D+E) 328,706.24
A.5.1.1.39 Pemasangan pipa beton diameter 100 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA m
Pekerja L.01 OH 0.380 100,000.00 38,000.00
Tukang batu L.02 OH 0.190 120,000.00 22,800.00
Kepala tukang L.03 OH 0.019 125,000.00 2,375.00
Mandor L.04 OH 0.019 130,000.00 2,470.00
JUMLAH TENAGA KERJA 65,645.00
B BAHAN
Gorong - gorong buis beton dia. 100 cm m' 1.100 227,250.00 249,975.00
Batu Bata buah 0.550 603.00 331.65
Semen PC. Kg 10.300 1,180.00 12,154.00
Pasir pasang m3 0.061 195,000.00 11,895.00
Pasir urug m3 0.069 127,800.00 8,818.20
JUMLAH HARGA BAHAN 283,173.85
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 348,818.85
E Overhead & Profit (10%) 10% x D 34,881.89
F Harga Satuan Pekerjaan (D+E) 383,700.74

A.5.1.1.40 Bak kontrol pasangan batu bata uk 30 x 30 tinggi 50 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 0.320 100,000.00 32,000.00
Tukang batu L.02 OH 0.150 120,000.00 18,000.00
Kepala tukang L.03 OH 0.015 125,000.00 1,875.00
Mandor L.04 OH 0.016 130,000.00 2,080.00
JUMLAH TENAGA KERJA 53,955.00
B BAHAN
Batu Bata buah 68.150 603.00 41,094.45
Semen PC. Kg 44.000 1,180.00 51,920.00
Pasir pasang m3 0.070 195,000.00 13,650.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.070 225,000.00 15,750.00
Pasir beton per m3 m3 0.060 227,700.00 13,662.00
Besi beton kg 1.600 9,747.00 15,595.20
JUMLAH HARGA BAHAN 151,671.65
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 205,626.65
E Overhead & Profit (10%) 10% x D 20,562.67
F Harga Satuan Pekerjaan (D+E) 226,189.32

A.5.1.1.41 Bak kontrol pasangan batu bata uk 45 x 45 tinggi 50 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 1.420 100,000.00 142,000.00
Tukang batu L.02 OH 0.473 120,000.00 56,760.00
Kepala tukang L.03 OH 0.047 125,000.00 5,875.00
Mandor L.04 OH 0.071 130,000.00 9,230.00
JUMLAH TENAGA KERJA 213,865.00
B BAHAN
Batu Bata buah 117.500 603.00 70,852.50
Semen PC. Kg 77.000 1,180.00 90,860.00
Pasir pasang m3 0.130 195,000.00 25,350.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.020 225,000.00 4,500.00
Pasir beton per m3 m3 0.090 227,700.00 20,493.00
Besi beton kg 2.600 9,747.00 25,342.20
JUMLAH HARGA BAHAN 237,397.70
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 451,262.70
E Overhead & Profit (10%) 10% x D 45,126.27
F Harga Satuan Pekerjaan (D+E) 496,388.97
A.5.1.1.42 Bak kontrol pasangan batu bata uk 60 x 60 tinggi 50 cm

No URAIAN Kode Satuan Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)

1 2 3 4 5 6 7

A TENAGA bh
Pekerja L.01 OH 2.160 100,000.00 216,000.00
Tukang batu L.02 OH 0.720 120,000.00 86,400.00
Kepala tukang L.03 OH 0.072 125,000.00 9,000.00
Mandor L.04 OH 0.108 130,000.00 14,040.00
JUMLAH TENAGA KERJA 325,440.00
B BAHAN
Batu Bata buah 174.370 603.00 105,145.11
Semen PC. Kg 114.000 1,180.00 134,520.00
Pasir pasang m3 0.184 195,000.00 35,880.00
Batu pecah 2-3 cm ( pecah mesin) m3 0.033 225,000.00 7,425.00
Pasir beton per m3 m3 0.120 227,700.00 27,324.00
Besi beton kg 4.850 9,747.00 47,272.95

JUMLAH HARGA BAHAN 357,567.06


C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 683,007.06
E Overhead & Profit (10%) 10% x D 68,300.71
F Harga Satuan Pekerjaan (D+E) 751,307.77

SRAGEN, JANUARI 2016


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SRAGEN

Ir. ZUBAIDI, MM
Pembina Utama
19611222 199009 1 001
USULAN HARGA SATUAN BANGUNAN, BAHAN DAN UPAH
DINAS PEKERJAAN UMUM
KABUPATEN SRAGEN
2014

NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN


1 2 3 4 5 6
1 Indeks Harga 1 Rumah Dinas
Bangunan Rumah a. Type A (250 m2) m2 3,374,300.00
Dinas/Gedung b. Type (150 m2) m2 3,374,300.00
Kantor/Gudang c. Type C, D, E (70, 50, 36 m2) m2 2,811,575.00

2 Gedung Kantor Tidak Bertingkat


a. Tidak Sederhana m2 4,201,475.00
b. Sederhana m2 3,001,200.00

3 Gedung Kantor Bertingkat


a. Tidak Sederhana m2 5,556,525.00
b. Sederhana m2 3,968,800.00

4 Pagar Rumah Dinas :


a. Type A
- Pagar Depan m' 1,117,250.00
- Pagar Belakang/Samping m' 1,017,415.00
b. Type B
- Pagar Depan m' 1,117,250.00
- Pagar Belakang/Samping m' 1,017,415.00
c. Type C,D, E
- Pagar Depan m' 1,015,775.00
- Pagar Belakang/Samping m' 924,960.00

Pagar Gedung Kantor :


a. Tidak Sederhana
- Pagar Depan m' 1,990,550.00
- Pagar Belakang/Samping m' 1,220,775.00

b. Sederhana
- Pagar Depan m' 1,809,125.00
- Pagar Belakang/Samping m' 1,110,075.00

2 Bahan Material 1 Batu kali belah m3 153,750.00


Bangunan 2 Batu putih m3 123,000.00
3 Kerikil sungai ayak tanpa pasir m3 162,500.00
4 Batu belah 15-20 cm ( pecah tangan ) m3 186,800.00
5 Batu pecah 7-10 cm ( pecah tangan ) m3 200,750.00
6 Batu pecah 5-7 cm ( pecah tangan ) m3 199,050.00
7 Batu pecah 3-5 cm ( pecah tangan ) m3 208,400.00
8 Batu pecah 2-3 cm ( pecah tangan ) m3 213,450.00
9 Batu pecah 3-5 cm ( pecah mesin) 0 210,950.00
10 Batu pecah 2-3 cm ( pecah mesin) m3 243,750.00
11 Batu pecah 1-2 cm ( pecah mesin ) m3 250,000.00
12 Batu pecah 0,5-1 cm ( pecah mesin ) m3 260,000.00
13 Batu pecah 2-3 cm ( pecah mesin) Kg 180.00
14 Filler / Abu Batu m3 240,400.00
15 Sirtu m3 123,000.00
16 Pasir halus m3 212,500.00
17 Pasir beton m3 212,500.00
18 Pasir beton kg 176.00
19 Pasir pasang m3 162,500.00
20 Pasir urug m3 110,000.00
21 Batu tempel/palimanan/paras m2 123,950.00
22 Batu tempel hitam/candi m2 120,000.00
23 Batu marmo kuning m2 117,000.00
24 Batu alur (hijau, kuning, putih) m2 156,000.00
25 Batu carport m2 158,000.00
26 Batu andesit (hitam,abu-abu,hijau) 20x20 cm m2 180,000.00
27 Batu andesit (hitam,abu-abu,hijau) 30x30 cm m2 196,950.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
28 Batu andesit (hitam,abu-abu,hijau) 30x60 cm m2 238,250.00
29 Batu andesit (hitam,abu-abu,hijau) 40x40 cm m2 235,050.00
30 Batu basalt Brownis Alur ( Coklat) 15x30 cm m2 168,400.00
31 Sandstone rata mesin (putih) 20x20 cm m2 118,600.00
32 Sandstone rata mesin (putih) 20x40 cm m2 127,050.00
33 Sandstone rata mesin (putih) 40x40 cm m2 127,050.00
34 Batu koral Sikat Ambon (putih) kg 3,950.00
35 Batu koral Sikat Lampung ( hitam) kg 3,850.00
36 Batu koral Sikat flores ( hitam pekat,merah& hijau) kg 3,850.00
37 Batu koral Sikat Kupang (hitam,kehijauan) kg 3,650.00
38 Batu tempel/templek Salagedang 20x20cm m2 127,050.00
39 Batu tempel/templek Salagedang 20x40 cm m2 133,450.00
40 Batu tempel/templek Salagedang 30x30 cm m2 149,350.00
41 Batu tempel/templek Salagedang 30x60 cm m2 152,500.00
42 Batu tempel/templek Salagedang Acak m2 105,900.00
43 Batu tempel/templek Purwokarta 13 cmx30cm m2 155,700.00
44 Batu tempel/templek Purwokarta 20 x 20 cm m2 120,700.00
45 Batu tempel/templek Purwokarta 20 x 40 cm m2 135,550.00
46 Batu tempel/templek Purwokarta acak m2 88,950.00
47 Batu palimanan 10x20 cm m2 110,700.00
48 Batu palimanan 15x30 cm m2 123,000.00
49 Batu palimanan 20x20 cm m2 123,000.00
50 Batu palimanan 20x40 cm m2 129,150.00
51 Batu palimanan 30x30 cm m2 135,300.00
52 Batu candi 10x20 cm m2 91,100.00
53 Batu candi 15x30 cm m2 99,550.00
54 Batu candi 20x20 cm m2 101,650.00
55 Batu candi 20x40 cm m2 105,900.00
56 Batu candi 30x30 cm m2 105,900.00
57 Bitumen ( Aspalt ) kg 14,500.00
58 Aspal curah kg 13,840.00
59 Kayu bakar m3 225,000.00
60 Tanah urug (pilihan) m3 55,350.00
61 Semen PC. Kg 1,655.00
62 Semen warna Kg 4,225.00
63 Tepung gipsum Kg 4,450.00
64 Kawur m3 250,000.00
65 Batu Bata buah 738.00
66 Agregat Halus m3 344,700.00
67 Agregat Kasar m3 298,300.00
68 Batu Kapur Bongkahan m3 270,000.00
69 Air kerja ltr 50.00
70 Batu muka m2 44,500.00
71 Batu gunung m3 135,300.00

BAHAN KAYU/BAMBU
1 Kayu jati (ekspose) m3 25,830,000.00
2 Kayu jati lokal (non ekspose) m3 19,680,000.00
3 Kayu bangkirai m3 13,886,000.00
4 Kayu kanfer m3 11,139,000.00
5 Kayu kruing m3 8,259,000.00
6 Kayu meranti m3 6,988,000.00
7 Kayu sengon untuk begesting (papan/kaso) m3 3,420,000.00
8 Kayu usuk jati ekspose m3 20,011,000.00
9 Kayu usuk jati ukuran 5 x 7 m3 13,976,000.00
10 Kayu jati untuk rangka plafond m3 12,674,000.00
11 Kayu usuk bangkirai m3 10,824,000.00
12 Kayu usuk kanfer m3 10,455,000.00
13 Kayu usuk kruing m3 8,046,000.00
14 Kayu kruing untuk rangka plafond m3 7,903,000.00
15 Kayu usuk meranti m3 6,150,000.00
16 Kayu reng jati 2/3 m3 11,700,000.00
17 Kayu reng jati 2/4 m3 11,700,000.00
18 Kayu reng kanfer 2/3 m3 6,700,000.00
19 Kayu reng kruing 2/3 m3 6,700,000.00
20 Plipit kayu jati 1/3 m' 6,700.00
21 Lis kayu profil 5 cm m' 9,000.00
22 Lis kayu profil 4 cm m' 6,500.00
23 Lis kayu profil 3,5 cm m' 6,000.00
24 Lis kayu profil 3 cm m' 5,500.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
25 Kayu lapis/ tripleks tb. 3 mm lembar 68,000.00
26 Kayu lapis/ tripleks tb. 4 mm lembar 76,500.00
27 Kayu lapis/ tripleks tb. 6 mm lembar 98,500.00
28 Kayu lapis/ tripleks tb. 9 mm lembar 184,300.00
29 Kayu lapis/ tripleks tb. 12 mm lembar 214,500.00
30 Kayu lapis/ tripleks tb. 18 mm lembar 298,700.00
31 Teak wood 120 x 240 cm lembar 162,200.00
32 Teak wood 90 x 220 cm lembar 92,500.00
33 Plywood tbl.4 mm (120 x 240) cm lembar 87,300.00
34 Papan akustik softboard 30 x 30 lembar 22,800.00
35 Papan akustik softboard 30 x 60 lembar 70,000.00
36 Papan akustik softboard 40 x 60 lembar 92,900.00
37 Papan akustik softboard 60 x 120 lembar 193,600.00
38 Bambu ori batang 24,600.00
39 Bambu apus batang 18,450.00
40 Dolken kayu kelas III diameter 8-10/400 cm batang 77,100.00
41 Formika lembar 87,300.00

BAHAN BETON CETAK, GENTENG, LANGIT2


1 Gorong - gorong buis beton dia. 20 cm m' 35,900.00
2 Gorong - gorong buis beton dia. 30 cm m' 48,900.00
3 Gorong - gorong buis beton dia. 40 cm m' 63,500.00
4 Gorong - gorong buis beton dia. 50 cm m' 100,880.00
5 Gorong - gorong buis beton dia. 60 cm m' 166,500.00
6 Gorong - gorong buis beton dia. 80 cm m' 209,100.00
7 Gorong - gorong buis beton dia. 100 cm m' 236,200.00
8 Gorong - gorong buis beton 1/2 dia. 20 cm m' 26,200.00
9 Gorong - gorong buis beton 1/2 dia. 30 cm m' 34,400.00
10 Tegel paving I, tb 5 cm K 175 m2 58,425.00
11 Tegel paving I, tb 5 cm K 200 m2 60,000.00
12 Tegel paving I, tb 5 cm K 225 m2 62,500.00
13 Tegel paving I, tb 7 cm K 175 m2 65,000.00
14 Tegel paving I, tb 7 cm K 200 m2 67,500.00
15 Tegel paving I, tb 7 cm K 225 m2 70,000.00
16 Tegel paving segi enam, tb 5 cm K 175 m2 60,000.00
17 Tegel paving segi enam, warna tb 5 cm K 175 m2 65,000.00
18 Tegel paving kawung, warna tb 5 cm K 175 m2 77,000.00
19 Genteng kodok kebumen bh 3,000.00
20 Genteng kodok kemiri bh 1,900.00
21 Genteng magas kebumen glasur bh 6,150.00
22 Genteng magas kebumen biasa bh 3,510.00
23 Genteng mantili mojolaban bh 1,722.00
24 Genteng morando kebumen glasur bh 7,995.00
25 Genteng morando kebumen biasa bh 4,305.00
26 Genteng Plentong mojolaban bh 1,600.00
27 Genteng pelentong kebumen bh 2,460.00
28 Genteng pelentong kemiri bh 1,550.00
29 Genteng garuda kemiri bh 1,350.00
30 Genteng beton bh 4,950.00
31 Bubung genteng kebumen bh 9,100.00
32 Bubung genteng mojolaban bh 6,500.00
33 Bubung genteng kemiri bh 5,300.00
34 Bubung genteng beton bh 10,400.00
35 Roster beton 12x11x24 buah 6,300.00
36 Hollow block 20 buah 22,750.00
37 Bata berongga ekspose kebumen buah 3,300.00
38 Bata berongga ekspose lokal buah 2,000.00
39 Penutup atap fibre glass gelombang (180 x 90) cm lembar 46,300.00
40 Penutup atap aluminium gelombang m2 256,700.00
41 Aluminium foil m2 36,000.00
42 Gipsum lembar 75,000.00
43 Harflek m2 18,800.00
44 Calsiboard m2 38,000.00
45 List gipsum profil 5-8 cm m 10,500.00
46 List gipsum profil 10-12 cm m 16,500.00
47 Genteng metal kelas I m2 277,100.00
48 Kerpus genting metal kelas I Bh 57,300.00
49 Genteng metal kelas II m2 148,900.00
50 Kerpus genting metal kelas II Bh 39,700.00
51 Tepung Gipsum kg 4,200.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
52 Tegel paving kawung, tb 5 cm K 200 m2 -
53 Tegel paving kawung, tb 5 cm K 225. m2 -
54 Tegel paving kawung, tb 7 cm K 175 m2 -
55 Tegel paving kawung, tb 7 cm K 200 m2 -
56 Tegel paving kawung, tb 7 cm K 225. m2 -
57 Adukan beton K-200 ready mix m3 -
58 Adukan beton K-250 ready mix m3 -
59 Adukan beton K-400 ready mix m3 -

BAHAN KERAMIK
1 Keramik dinding 10 x 20 cm kelas I buah 1,750.00
2 Keramik dinding 20 x 25 cm kelas I buah 3,875.00
3 Keramik dinding 20 x 20 cm kelas I buah 3,575.00
4 Keramik dinding 11 x 11 cm kelas I buah 650.00
5 Keramik dinding artistik 5 x 20 cm kelas I buah 1,168.50
6 Keramik dinding artistik 10 x 20 cm kelas I buah 2,238.60
5 Keramik dinding marmer 100 x 100 cm kelas I buah 200,000.00
6 Keramik lantai 20 x 20 cm kelas I buah 2,600.00
7 Keramik lantai 30 x 30 cm kelas I buah 7,500.00
6 Keramik lantai 33 x 33 cm kelas I buah -
8 Keramik lantai 40 x 40 cm kelas I buah 13,650.00
9 Keramik lantai 60 x 60 cm kelas I buah 36,850.00
10 Keramik dinding 10 x 20 cm kelas II buah 1,410.00
11 Keramik dinding 20 x 25 cm kelas II buah 3,030.00
12 Keramik dinding 20 x 20 cm kelas II buah 2,450.00
13 Keramik dinding artistik 5 x 20 cm kelas II buah 3,820.00
13 Keramik dinding artistik 10 x 20 cm kelas II buah 1,560.00
14 Keramik dinding marmer 100 x 100 cm kelas II buah 150,000.00
15 Keramik lantai 20 x 20 cm kelas II buah 2,290.00
16 Keramik lantai 30 x 30 cm kelas II buah 5,680.00
17 Keramik lantai 33 x 33 cm kelas II buah 10,830.00
18 Tegel granit 60 x 60 cm kelas I buah 64,575.00
19 Tegel granit 60 x 60 cm kelas II buah 47,355.00
20 Tegel granit 40 x 40 cm buah 16,400.00
21 Tegel granit 30 x 30 cm buah 7,450.00
22 Keramik plin 10 x 20 cm buah 2,840.00
23 Parquet kayu m2 102,630.00
24 Lantai kayu (gymfloor) m2 128,280.00
25 Lantai vinyl karet buah 12,320.00
26 Floor hardener kg 2,580.00
27 Vinyl 30 x 30 buah 3,610.00
28 Kloset porselin jongkok kelas I buah 241,160.00
29 Kloset porselin jongkok kelas II buah 153,940.00
30 Kloset duduk/Monoblok kelas I buah 2,952,000.00
31 Kloset duduk/Monoblok kelas II buah 1,282,730.00
32 Bak fiberglass sudut 0,3 m3 buah 359,170.00
33 Urinoir buah 615,710.00
34 Wastafel buah 513,090.00
34 Bak teraso buah 342,860.00
35 Bak Kip fiberglass buah 935,060.00
36 Bak Kip poselin buah 2,094,640.00
37 Bak cuci Stainles steel 1 bak buah 282,210.00
38 Bak cuci Stainles steel 2 bak buah 533,610.00
39 Lem Vinyl kg 25,670.00
40 Wall papre 50 cm m' 66,710.00
41 Lem kg 35,930.00
42 Bata lapis dinding 3 x 7 x 24 cm buah 1,030.00

BAHAN BESI / LOGAM


1 Bindrad kg 19,750.00
2 Baja gulungan ukuran ringan kg 17,250.00
3 Baja anyaman bronjong kg 26,890.00
4 Baja ( baut - baut ) kg 23,000.00
5 Baja ( paku jembatan ) kg 25,000.00
6 Besi beton kg 12,915.00
7 Wire mesh kg 22,580.00
8 Besi plat kg 21,500.00
9 Besi profil kg 17,100.00
10 Besi IWF kg 20,900.00
11 Kawat galvanis kg 24,500.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
12 Kawat nyamuk m2 24,500.00
13 Kawat kasa m2 35,000.00
14 Kawat harmonika m2 35,500.00
15 Kawat duri m 7,800.00
16 Pintu lipat besi m2 743,125.00
17 Pintu rolling door besi m2 369,000.00
18 Pintu rolling door aluminium m2 492,000.00
19 Jendela besi strip plat m2 492,000.00
20 Jendela nako ukr. 1 m x 1 m unit 338,250.00
21 Profil aluminium m 77,100.00
22 Aluminium strip 8 cm m 25,670.00
23 Skrup fixer bh 5,150.00
24 Paku kg 17,970.00
25 Paku anti karat kg 33,400.00
26 Paku skrup kg 43,050.00
27 Hollow 4x4 cm btg 74,415.00
28 Hollow 2x2 cm btg 41,820.00
29 Ramset/dina bolt bh 6,750.00
30 Tralis besi strip m2 154,100.00
31 Besi strip kg 21,760.00
32 Strip Plat 3/4" m' 24,200.00
33 Strip Plat 1" m' 28,400.00
34 Strip Plat 1 1/4" m' 33,400.00
35 Talang seng t = 0.3 mm L = 45 m' 38,500.00
36 Talang seng t = 0.3 mm L = 55 m' 41,100.00
37 Talang seng t = 0.3 mm L = 60 m' 46,200.00
38 Talang seng t = 0.3 mm L = 70 m' 51,400.00
39 Talang seng t = 0.3 mm L = 90 m' 66,800.00
40 Seng gelombang 0,8 x 1,80 lembar 87,300.00
41 Seng gelombang 0,8 x 2,10 lembar 102,700.00
42 Seng plat (90 x 180) lembar 87,300.00
43 Galvalum tebal 0.4 mm m2 80,600.00
44 Sunscreen alluminium m2 22,700.00

BAHAN KACA
1 Kaca bening 5 mm m2 92,250.00
2 Kaca bening 8 mm m2 184,500.00
3 Kaca rayband 5 mm m2 110,700.00
4 Kaca rayband 8 mm m2 209,100.00
5 Kaca jeruk 3 mm m2 110,700.00
6 Kaca jeruk 5 mm m2 221,400.00
7 Kaca es 3 mm m2 92,250.00
8 Kaca es 5 mm m2 135,300.00
9 Kaca cermin 5 mm m2 184,500.00
10 Kaca Bening 3 mm m2 67,650.00

BAHAN PIPA
1 Pipa black Steel 6" Sched # 20 m' 293,600.00
2 Screw stainless steel dia 6 mm m' 380,400.00
3 Reducer 10" ke 6" buah 120,200.00
4 Gravel m' 320,200.00
5 Stemvet Kg 16,100.00
6 Bentonite Kg 12,800.00
7 Pipa Piezometer GIP 1" m' 60,200.00
8 Lem pipa kg 115,600.00
9 Baut 5/8 " buah 13,000.00
10 Kunci gembok buah 26,500.00
11 Plastik buah 550.00
12 Pipa PVC 10 mm ( 1/2 ) " AW m 5,000.00
13 Pipa PVC 20 mm ( 3/4 ) " AW m 7,000.00
14 Pipa PVC 25 mm ( 1 ) " AW m 9,500.00
15 Pipa PVC 30 mm ( 1 1/4 ) " AW m 16,000.00
16 Pipa PVC 40 mm ( 1 1/2 ) " AW m 18,500.00
17 Pipa PVC 50 mm ( 2 ) " AW m 18,200.00
18 Pipa PVC 64 mm ( 2 1/2) " AW m 29,500.00
19 Pipa PVC 80 mm ( 3 ) " AW m 34,000.00
20 Pipa PVC 100 mm ( 4 ) " AW m 55,500.00
21 Pipa PVC 150 mm ( 6 ) " AW m 149,000.00
22 Pipa besi Galvanis ( GIP ) DN 100 mm 4" m 173,250.00
23 Pipa besi Galvanis ( GIP ) DN 75 mm 3" m 172,800.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
24 Pipa besi Galvanis ( GIP ) DN 50 mm 2.5" m 156,600.00
25 Pipa besi Galvanis ( GIP ) DN 50 mm 2" m 130,200.00
26 Pipa besi Galvanis ( GIP ) DN 40 mm 1 1/2" m 96,600.00
27 Pipa besi Galvanis ( GIP ) DN 30 mm 1 1/4" m 70,850.00
28 Pipa besi Galvanis ( GIP ) DN 25 mm 1" m 55,650.00
29 Pipa besi Galvanis ( GIP ) DN 20 mm 3/4" m 41,450.00
30 Pipa besi Galvanis ( GIP ) DN 10 mm 1/2" m 27,800.00
31 Tangki fiber kapasitas 0,50 m3 buah 1,600,000.00
32 Tangki fiber kapasitas 1 m3 buah 3,500,000.00
33 Tangki fiber kapasitas 2 m3 buah 6,800,000.00
34 Tangki fiber kapasitas 3 m3 buah 7,850,000.00
35 Tangki fiber kapasitas 5 m3 buah 11,750,000.00
36 Pompa Submersible kap. 0,5 - 1 L/Dt buah 21,000,000.00
37 Pompa Submersible kap. 1 - 2 L/Dt buah 26,500,000.00
38 Pompa Submersible kap. 2 - 3 L/Dt buah 36,000,000.00
39 Pompa Submersible kap. 15 - 17,5 L/Dt buah 65,000,000.00
40 Pompa Boster kap. 0,5 - 1 L/Dt buah 11,750,000.00
41 Pompa Boster kap. 1 - 2 L/Dt buah 19,500,000.00
42 Pompa Boster kap. 2 - 3 L/Dt buah 26,500,000.00
43 Pompa Jet pump 0,5 - 1 L/Dt buah 6,000,000.00
44 Pompa Jet pump 1 - 1,5 L/Dt buah 8,250,000.00
45 Pelampung automatis DN 15 buah 150,000.00
46 Pelampung automatis DN 25 buah 250,000.00
47 Pelampung automatis DN 40 buah 400,000.00
48 Water meter DN 20 buah 200,000.00
49 Water meter DN 25 buah 250,000.00
50 Water meter DN 40 buah 350,000.00
51 Water meter DN 50 buah 500,000.00
52 Water meter DN 80 buah 1,250,000.00
53 Water meter DN 100 buah 1,750,000.00
54 Water meter DN 150 buah 3,500,000.00
55 Stabilizer buah 5,500,000.00
56 Panel buah 4,500,000.00

BAHAN LAIN-LAIN
1 Kunci tanam antik buah 149,000.00
2 Kunci tanam biasa buah 113,500.00
3 Kunci silinder buah 185,000.00
4 Kunci slot buah 157,000.00
5 Engsel pintu buah 22,000.00
6 Engsel jendela buah 17,000.00
7 Grendel ukuran besar buah 47,000.00
8 Grendel ukuran kecil buah 12,500.00
9 Kait angin buah 14,000.00
10 Espanyolete buah 77,500.00
11 Spring Knife buah 26,500.00
12 Door closer buah 214,000.00
13 Door Holder buah 31,000.00
14 Door stops buah 47,000.00
15 Rel pintu dorong buah 182,500.00
16 Fiberglass ( uk. 0,80 m x 3,00 m ) lembar 123,500.00
17 Cat tembok eksterior Kg 95,300.00
18 Cat tembok interior Kg 20,350.00
19 Cat kayu / besi Kg 54,120.00
20 Cat genteng Kg 35,950.00
21 Plamir kayu Kg 25,215.00
22 Plamir tembok (alkali) Kg 54,120.00
23 Plamir tembok Kg 15,375.00
24 Teer liter 55,000.00
25 Meny Kg 24,500.00
26 Minyak cat liter 21,600.00
27 Minyak tanah liter 15,300.00
28 Dempul Kg 24,500.00
29 Wood filler Kg 46,063.50
30 Amplas kayu lembar 3,700.00
31 Amplas besi lembar 4,200.00
32 Minyak begesting liter 3,700.00
33 Pelitur liter 51,000.00
34 Vernis liter 41,000.00
35 Soda api Kg 31,000.00
NO JENIS KEGIATAN PERINCIAN KEGIATAN SATUAN INDEKS HARGA 2014 KETERANGAN
36 Lem kayu Kg 26,500.00
37 Kuas 1" buah 8,000.00
38 Kuas 1 1/2" buah 10,500.00
39 Kuas 2" buah 13,500.00
40 Kuas 3" buah 16,000.00
41 Kuas 4" buah 18,500.00
42 Kran air 1/2" buah 18,500.00
43 Kran air 3/4" buah 21,500.00
44 Seal tape buah 6,750.00
45 Floor drain plastik buah 20,600.00
46 Floor drain stainles buah 44,200.00
47 Pipa tanah dia 15 cm buah 8,300.00
48 Pipa tanah dia 20 cm buah 14,300.00
49 Wallpaper m2 209,500.00
50 Vertical blinds/venetions blinds m2 92,500.00
51 Perekat ( lem ) buah 14,400.00
52 Sealant tube 102,800.00
53 Pintu alumunium buah 308,000.00
54 Pintu PVC Polos buah 333,600.00
55 Pintu PVC Motif buah 410,600.00
56 Pintu lipat PVC m2 184,800.00
57 Tali ijuk Kg 15,500.00
58 Alat kerja (sekop, ikrak dll) unit 82,200.00
59 Sewa alat Jam 36,000.00
60 Kawat las Kg 47,800.00
61 Strorox Kg 25,800.00
62 Waterstop lbr 150mm m 154,100.00
63 Waterstop lbr 200mm m 179,700.00
64 Waterstop lbr 230-320mm m 205,400.00
65 Sabun kg 13,000.00
66 Engsel angin buah 19,400.00
67 Engsel pintu klam buah 13,000.00

2 Satuan Upah Tenaga 1 Mandor OH 70,000.00


Bangunan 2 Kepala tukang OH 65,000.00
3 Tukang batu OH 60,000.00
4 Tukang kayu OH 60,000.00
5 Tukang cat OH 60,000.00
6 Tukang besi OH 60,000.00
7 Tukang las OH 60,000.00
8 Tukang aluminium OH 60,000.00
9 Tukang pipa OH 60,000.00
10 Pekerja OH 50,000.00
11 Mekanik terlatih OH 60,000.00
12 Mekanik semi terlatih OH 55,000.00
13 Operator terlatih OH 60,000.00
14 Operator semi terlatih OH 55,000.00
15 Pembantu operator OH 50,000.00
16 Buruh terlatih OH 55,000.00
17 Buruh semi terlatih OH 50,000.00
18 Sopir OH 55,000.00
19 Pembantu sopir OH 50,000.00
20 Team leader/Koordinator tenaga ahli OH 130,000.00
21 Tenaga Ahli/ Hydrogeologist/Geophisicist/ Driller OH 125,000.00
22 Asistent Tenaga Ahli OH 100,000.00
23 Crew/Staf tenaga ahli/Operator pompa OH 60,000.00

SRAGEN, Oktober 2013


KEPALA DINAS PEKERJAAN UMUM
KABUPATEN SRAGEN

Ir. ZUBAIDI, MM
Pembina Utama Muda
NIP. 19611222 199009 1 001

Anda mungkin juga menyukai