BALAI BESAR PELAKSANAAN JALAN NASIONAL VI MAKASSAR

BIDANG PENGENDALIAN SISTEM PELAKSANAAN

PENGUJIAN DAN PERALATAN

LAPORAN HASIL PENGUJIAN


QUALITY CONTROL
JOB MIX DESIGN (JMD)
PAKET PELEBARAN JALAN
TABOLI - KEBUN KOPI (SEKSI I)
PT. SAPTA UNGGUL

TAHUN 2013

Ganda Suraperwata M.Eng Sc


NIP. 110 033 080
BALAI BESAR PELAKSANAAAN JALAN NASIONAL VI MAKASSAR

BIDANG PENGENDALIAN SISTEM PELAKSANAAN

PENGUJIAN DAN PERALATAN

LAPORAN HASIL PENGUJIAN


QUALITY CONTROL
JOB MIX DESIGN (JMD)
PENINGKATAN STRUKTUR
JALAN MAKALE - SE'SENG
PT. SABAR JAYA PRATAMA

TAHUN 2012

Ganda Suraperwata M.Eng Sc


NIP. 110 033 080
STANDAR NASIONAL INDONESIA (SNI)

MATERIAL 2-3, 1-2, 0,5-1, ABU BATU, ASBUTON 15/25 TANGGAL :

No Jenis Pemeriksaan SNI

1 Analisa Saringan 03-1968-1990

2 Berat JenisAgregate Kasar 03-1969-1990

3 Berat Jenis Agregate Halus 03-1970-1990

4 Berat JenisAspal Minyak 06-2441-1991

5 Penetrasi 06-2456-1991

6 Daktilitas 06-2432-1991

7 Titik Lembek 06-2434-1991

8 Abrasi 03-2417-1991

9 Soundness 03-3407-1994

10 Bobot Isi 03-4804-1998

11 Sand Equivalent 03-4428-1997

12 Pipih & Lonjong RSNI T 01 - 2005

13 Angularitas Kasar Dot.s PTM No.621

14 Angularitas Halus 03-6877-2002

15 Pemadatan Berat 1743:2008

16 Attembereg 1966:2008

17 Design CBR Lab 03-1744-1989

18 Mix Design (Hot Mix) 13-2834-2000

19 Marshall Test 06-2489-1991

Kepala Laboratorium BBPJN VI Makassar

Ganda Suraperwata, M.Eng.Sc


NIP. 19570702 198403 1 001
Paket 0
Kontraktor 0

REKAPITULASI PEMERIKSAAN

MATERIAL 2-3, 1-2, 0,5-1, ABU BATU, ASBUTON 15/25 TANGGAL :

Split
No Jenis Pemeriksaan Abu Batu Sirtu Pasir
2-3 1-2 0,5-1

1 Analisa Saringan

2" 100 100 Err:509 100 Err:509 #NAME?

11/2" 100 100 Err:509 100 Err:509 #NAME?

1" 68.15 96 Err:509 100 Err:509 #NAME?

3/4" 22.36 37.56 Err:509 100 Err:509 #NAME?

1/2" 6.55 7.77 Err:509 100 Err:509 #NAME?

3/8" 0.00 0.48 Err:509 99 Err:509 #NAME?

No. 4 0 0 Err:509 95.38 Err:509 #NAME?

No. 8 Err:509 75.62 Err:509 #NAME?

No.10 Err:509 67.13 Err:509 #NAME?

No. 16 Err:509 50.91 Err:509 #NAME?

No. 30 Err:509 32.94 Err:509 #NAME?

No.40 Err:509 28.88 Err:509 #NAME?

No. 50 Err:509 22.98 Err:509 #NAME?

No. 100 Err:509 15.82 Err:509 #NAME?

No. 200 Err:509 9.76 Err:509 #NAME?

2 Berat Jenis

a. Bulk Err:509 Err:509 2.61 Err:509 2.59 Err:509

b. SSD Err:509 Err:509 2.65 Err:509 2.64 Err:509

c. Semu Err:509 Err:509 2.74 Err:509 2.71 Err:509

d. Penyerapan Err:509 Err:509 1.80 Err:509 1.76 Err:509


3 a. Berat JenisAspal Minyak 1.033

b. Penetrasi 64.2

c. Daktilitas Cm 136.0

d. Titik Lembek ⁰C 50.9


4 a. Abrasi % - 28.594 - - #NAME? -

b. Soundness % - 2.181 - - - 4.114


5 Berat Isi

a. Lepas 1.31 Err:509 Err:509 Err:509 Err:509 Err:509

b. Padat 1.35 Err:509 Err:509 Err:509 Err:509 Err:509

6 Send Equivalent - - - 81.73 - 0.00

7 Pipih & Lonjong % - 3.128 - - - -


8 a. Angularitas kasar % - 94.8/91.9 - - - -

b. Angularitas Halus % - - - 50.48 - Err:509

9 Pemadatan Berat/Ringan KOMPOSISI

MATERIAL 2-3 1-2 0,5-1 Abu Batu Sirtu Pasir


LPA-S % 13 0 0 10 65 12

LPA-B % 23 10 0 0 58 9

LPA-A % 35 18 17 30 0 0

Pemadatan Berat LPA-S LPA-B LPA-A

a. Berat Jenis #REF! #REF! 2.662

b. γD Max t/m³ 2.024 2.043 2.135

c. W Optimum % 11.15 9.32 6.50

d. ATTEMBERG

e. Liquid Limit 22.12 18.81

f. Plastic Limit 17.50 15.57

g. Indek Plastis 4.62 3.24 NON PLASTIS

10 Design CBR

a. CBR 100% γD Max

1" 53.1 61 94.1


b. Dengan Penetrasi
2" 64.68 74.2 113.3

11 Mix Design (Hot Mix)

AC BC Asb-P AC WC Asb-P

a. Split 2-3 % 6.61

b. Split 1-2, % 12.28 11.26

c. Split 0,5-1 % 33.06 37.52

d. Abu Batu % 40.62 43.15

e. Asbuton % 4.71 4.69

f. Kadar Aspal Opt % 5.54 6.20


12 a. Kadar Bitumen AsbP % #REF!

b. Kadar Air Asb % 1.02


13 GMM 2.369 2.357

14 Marshall Test

a. Berat Isi G/cc 2.275 2.251

b. VIM % 4.20 4.12

c. VMA % 14.50 15.48

d. VFB % 71.80 73.00

e. Stabilitas Kg 1870 1661

f. Flow mm 3.20 3.80

g. Marshall Quotient Kg/mm 571 440

15 Mix Design Beton

Prporsi Campuran (/m3) MUTU BETON K-250

a. Semen Kg 480.5

b. Air Kg 185.0

c. Agregat Halus Kg 622.5

d. Agregat Kasar

' - Split 2 - 3 Kg 687.8

' - Split 1 - 2 Kg 409.2


16 Kuat Tekan Beton

MENGGUNAKAN SEMEN TONASA

MUTU BETON K-250

UMUR BETON 7 HARI 28 HARI

1 Kg/cm2 174.53 268.51

2 Kg/cm2 166.44 256.07

3 Kg/cm2 164.00 252.31

4 Kg/cm2 164.04 252.38

UMUR BETON 14 HARI 28 HARI

5 Kg/cm2 223.38 253.84

6 Kg/cm2 222.76 253.13

7 Kg/cm2 228.67 259.85

8 Kg/cm2 229.82 261.16

UMUR BETON 21 HARI 28 HARI

9 Kg/cm2 251.69 264.94

10 Kg/cm2 249.96 263.11

11 Kg/cm2 245.51 258.43

12 Kg/cm2 252.18 265.45


16

UMUR BETON 28 HARI 28 HARI

13 Kg/cm2 259.82 259.82

14 Kg/cm2 270.13 270.13

15 Kg/cm2 260.27 260.27

16 Kg/cm2 260.80 260.80

Catatan:
- Hindari Pemakaian Batu Bulat pada Campuran Beraspal.
- Demikian hasil Pengujian kami, yang selanjutnya digunakan sebagai bahan pembanding di Lapangan.

Makassar, 2013
Mengetahui,
Manajer Teknik

Masdar, ST
NIP. 19661225 200701 1 003
Kode Pengujian : Jenis Contoh : K 250
Paket 0 Terima Tgl. :
Kontraktor 0 Metode Uji : SNI 03-1974-1990

COMPRESSIVE STRENGTH TEST RESULT BETON K-350

MATERIAL : Agregat 2-3, 1-2, Pasir, Semen TONASA TANGGAL :

BENTUK PANJANG LEBAR TINGGI DIAMETER UMUR LUAS VOLUME BERAT UNIT BEBAN KUAT TEKAN UMUR 28 HARI
No. COR SLUMP TEST BERAT (kg)
CONTOH (cm) (cm) (cm) (cm) (hari) (cm²) (cm³) (kg/cm³) (kg) (Kg/cm²) (Kg/cm²)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

1 Kubus 15 15 15 - 19 April 2012 6 26 April 2012 7 225 3375 8075.0 2.393 39270 174.53 268.51

2 Kubus 15 15 15 - 19 April 2012 6 26 April 2012 7 225 3375 7984.0 2.366 37450 166.44 256.07

3 Kubus 15 15 15 - 19 April 2012 6 26 April 2012 7 225 3375 7908.0 2.343 36900 164.00 252.31

4 Kubus 15 15 15 - 19 April 2012 6 26 April 2012 7 225 3375 8054.0 2.386 36910 164.04 252.38

5 Kubus 15 15 15 - 19 April 2012 6 03 MEI 2012 14 225 3375 8009.0 2.373 50260 223.38 253.84

6 Kubus 15 15 15 - 19 April 2012 6 03 MEI 2012 14 225 3375 8079.0 2.394 50120 222.76 253.13

7 Kubus 15 15 15 - 19 April 2012 6 03 MEI 2012 14 225 3375 8032.0 2.380 51450 228.67 259.85

8 Kubus 15 15 15 - 19 April 2012 6 03 MEI 2012 14 225 3375 7900.0 2.341 51710 229.82 261.16

9 Kubus 15 15 15 - 19 April 2012 6 10 MEI 2012 21 225 3375 7916.0 2.345 56630 251.69 264.94

10 Kubus 15 15 15 - 19 April 2012 6 10 MEI 2012 21 225 3375 8100.0 2.400 56240 249.96 263.11

11 Kubus 15 15 15 - 19 April 2012 6 10 MEI 2012 21 225 3375 8022.0 2.377 55240 245.51 258.43

12 Kubus 15 15 15 - 19 April 2012 6 10 MEI 2012 21 225 3375 8007.0 2.372 56740 252.18 265.45

13 Kubus 15 15 15 - 19 April 2012 6 17 MEI 2012 28 225 3375 8103.0 2.401 58460 259.82 259.82

14 Kubus 15 15 15 - 19 April 2012 6 17 MEI 2012 28 225 3375 7999.0 2.370 60780 270.13 270.13

15 Kubus 15 15 15 - 19 April 2012 6 17 MEI 2012 28 225 3375 7940.0 2.353 58560 260.27 260.27

16 Kubus 15 15 15 - 19 April 2012 6 17 MEI 2012 28 225 3375 8011.0 2.374 58680 260.80 260.80

Nama : JUHSENISTO Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


###
KUAT TEKAN BETON K-350

MATERIAL : Agregat Kasar, Agregat Halus, Semen Type PCC,Air TANGGAL :

A Kuat Tekan yang diisyaratkan (Kubus) 35 Mpa Pada 28 hari


B Deviasi Standar 4 Mpa
C Nilai Tambah ( margin ) 1.64 x 4 Mpa = 6.56 Mpa
D Kekuatan Rata-rata yang ditargetkan 35 + 6.56 = 31.56 Mpa
E Jenis Semen TypePCC
F Jenis Agregat : - Kasar Batu Pecah
- Halus Alami ( Pasir )
G Faktor Air Semen 0.385
H Faktor Air Semen Maksimum -
I Slump 30 - 60 mm
J Ukuran Agregat Maksimum 40 mm
K Kadar Air Bebas
2/3 wh + 1/3 wk 2/3 x 160 + 1/3 x 190 = 116.6 + 68.3 = 170 kg / m3
L Jumlah Semen 184.3/ 0.48 = 480.5Kg/m3
M Jumlah Semen Maksimum -
N Jumlah Semen Minimum -
O Faktor Air Semen yang di sesuaikan 0.385
P Susunan Butir Agregat Halus Grafik 3
Q Susunan Butir Agregat Kasar Grafik 9
R Persen Agregat Halus Y0 = ( 24 + 47) / 2 = 35.5
Y1 = 98
Y2 = 0
Maka :
35.5= 94 x ( X/100 ) + 0 x ( 100 - X ) /100
35.5 = 0.98 X
X = 35.5/0.98
X = 36.2%
S Berat Jenis Relatif Agregat Gabungan 2.650
T Berat Isi Beton 2385
U Kadar Agregat Gabungan 2385 - 185-480.5 = 1719.5 Kg/m3
V Kadar Agregat Halus 36.2% x 1719.5 = 622.5 Kg/m3
W Kadar Agregat Kasar 1719.5-622.5 = 1097.0 Kg/m3
X Proporsi Campuran : ( /m3 )
- Semen (TONASA) 480.5 Kg/m3
- Air 185 Kg/m3
- Agregat Halus ( Pasir ) 622.5 Kg/m3
- Agregat Kasar
1. Split 2-3 40/63.8x 1097= 687.8 Kg/m3
2. Split 1-2 23.8/63.8 x 1097 = 409.2 Kg/m3
1097.0 Kg/m3
COMBINED GRADATION

Total SpesifIcation

No 2-3 1-2 PASIR Combined


2-3 1-2 PASIR Control
Saringan 40 23.8 36.2 Gradation

A B C D E F MAX MIN

2" 50.000 100 100 #NAME? 40 24 #NAME? #NAME? 100 100

11/2" 37.500 100 100 #NAME? 40 24 #NAME? #NAME? 100 95

1" 25.000 68.15 96 #NAME? 27.26 23 #NAME? #NAME? - -

3/4" 19.000 22.36 37.56 #NAME? 8.94 8.94 #NAME? #NAME? 80 45

1/2" 12.500 6.55 7.77 100.00 2.62 1.85 36.20 40.67 - -

3/8" 9.500 0.00 0.48 100.00 0.00 0.11 36.20 36.31 - -

No. 4 4.750 0 0 98.10 0 0 35.51 35.51 50 25

No. 8 2.360 0 0 74.32 0 0 26.90 26.90 - -

No.10 2.000 0 0 68.00 0 0 24.62 24.62 - -

No. 16 1.180 0 0 49.00 0 0 17.74 17.74 - -

No. 30 0.600 0 0 26.80 0 0 9.70 9.70 30 8

No.40 0.425 0 0 17.84 0 0 6.46 6.46 - -

No. 50 0.300 0 0 10.51 0 0 3.80 3.80 - -

No. 100 0.150 0 0 3.89 0 0 1.41 1.41 8 0

No Sieve N 50
No. 200 No. 100 No. No. 30 No. 16 No. 8 No. 4N 3/8" 1/2" 3/4" 1 11/2 2"
o 65,62 o 65,6 65,62 " " 100
. % 2% %
5 4
0 6
5
, 90
6
2

Total Percent Passing (%)


%
80

Control

70
Mix Design

60

50

40

30

20

10

0
GRADATION

MATERIAL : AGREGAT KASAR TANGGAL :

CONTOH I = Gram CONTOH II = Gram


NO RATA-RATA SPESIFIKASI
BERAT KUMILATIF BERAT KUMILATIF

TERTAHAN BERAT % % TERTAHAN BERAT % % % LEWAT


SARINGAN CONTROL
MASING2 TERTAHANTERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

MAX MIN

2" 100 100 100 100 ###


11/2" 100 100 100 ###
1" 68.15 95.80 81.97 ###
3/4" 22.36 37.56 29.96 ###
1/2" 6.55 7.77 7.16 ###
3/8" 0 0.48 0.24 ###
No. 4 0 0 0 ###
No. 8 0 0 0 ###
N0. 10 0 0
No. 16 0 0 ###
No. 30 0 0 ###
No. 40 0 0
No. 50 ###
No. 100 ###
No. 200 ###
Pan

No Sieve No. 200 No. 100 No.50 No. 30 No. 16 No 8 No 4 3/4" 1" 11/2" 2"
3/8" 1/2"
65,6 100
2%

90
Total Percent Passing (%)

80

70

60
Gradation

50

40

30

20

10

0
1" - 3/4" 27.93 100 95.69 4.31 4.31 1.204
1 1/2" - 1" 62.88 100 95.76 4.24 4.24 2.666
2 1/2" - 1 1/2" 100 96.43 3.57 3.56999999999999 0.000
TOTAL 100 4.114

SOUNDNESS
SNI 03 - 3407 - 1990
MATERIAL : SPLIT ( 1 - 2 ) TANGGAL :

% BERAT BERAT KEHILANGAN % %


NO
GRADASI PRAKSI FRAKSI BERAT BERAT BERAT RATA-RATA
DARI SEBELUM SESUDAH DARI TIAP-TIAP DARI BAGIAN / DIKOREKSI OLEH
SARINGAN
SAMPLE TEST TEST FRAKSI YANG HILANG % YANG HILANG
Lolos No.4
3/8" - No. 4 28.24 301.2 296.3 4.90 1.627 0.459
1/2" - 3/8" 47.55 325 319.5 5.50 1.692 0.805
3/4" - 1/2" 14.82 671.2 630.80 40.40 6.019 0.892
1" - 3/4" 9.39 500.8 484.50 16.30 3.255 0.306
1 1/2" - 1"
2 1/2" - 1 1/2" 0.00 #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
TOTAL 100.00 2.462
GRADATION

MATERIAL : AGREGAT HALUS TANGGAL :

CONTOH I = 1000 Gram CONTOH II 1000.9 Gram


NO RATA-RATA SPESIFIKASI
BERAT KUMILATIF BERAT KUMILATIF

TERTAHAN BERAT % % TERTAHAN BERAT % % % LEWAT DAERAH FULLER


SARINGAN CONTROL
MASING2 TERTAHANTERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT LARANGAN

MAX MIN MAX MIN

2" #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?###

11/2" #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?###

1" #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?###

3/4" #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME? #NAME?###

1/2" 0 #NAME? #NAME? #NAME? 0 #NAME? #NAME? #NAME? #NAME?###

3/8" 0 #NAME? #NAME? #NAME? 0 #NAME? #NAME? #NAME? #NAME?###

No. 4 16.8 #NAME? #NAME? #NAME? 21.2 21.2 2.12 97.88 #NAME?###

No. 8 235.7 #NAME? #NAME? #NAME? 240.1 261.3 26.11 73.89 #NAME?###

No.10 63.9 #NAME? #NAME? #NAME? 62.5 323.8 32.35 67.65 #NAME?###

No. 16 197.7 #NAME? #NAME? #NAME? 182.5 506.3 50.58 49.42 #NAME?###

No. 30 217.4 #NAME? #NAME? #NAME? 226.9 733.2 73.25 26.75 #NAME?###

No.40 89.1 #NAME? #NAME? #NAME? 90.1 823.3 82.26 17.74 #NAME?###

No. 50 74.3 #NAME? #NAME? #NAME? 49.2 872.5 87.17 12.83 #NAME?###

No. 100 67.8 #NAME? #NAME? #NAME? 87.9 960.4 95.95 4.05 #NAME?###

No. 200 12.9 #NAME? #NAME? #NAME? 16.2 976.6 97.57 2.43 #NAME?###

Pan 24.4 #NAME? #NAME? #NAME? 24.30 1000.9 100.00 0.00 #NAME?

No Sieve No. 200 No. 100 No.50 No. 30 No. 16 No 8 No 4 3/8" 1/2" 3/4" 1" 11/2" 2"
65,6
2% 100

Gradation
90

Total Percent Passing (%)


80

70

60

50

40

30

20

10

0
Err:509 : Jenis Contoh Err:509
Paket ### Terima Tgl. Err:509
Kontraktor ### Description : Nilai CBR dan Kepadata
Metode Uji : SNI 03-1744-1989

MATERIAL : KOMBINASI LPA KLAS A TANGGAL :

2.25 2.25
Berat Isi Kering (gr/cc)

Berat Isi Kering (gr/cc)


2.15 2.15

2.05 2.05

1.95 1.95

1.85 1.85

1.75 1.75

1.65 1.65
4.00 6.00 8.00 10.00 12.00 14.00 16.00 10 40 70 100

CBR
Kadar Air (%)

Cara Pemadatan : Pemadatan Berat Cara D

Berat Jenis Gabungan : #REF!

Kadar Air Optimum : 11.150 %

γD maximum : 2.024 t/m³

CBR 100% γD Max Penetrasi : 1" = 53.1 %

2" = 64.68 %

Nama Diperiksa Oleh, Nama : Masdar, ST

Di Uji Mulai Tgl. KONSULTAN SUPERVISI Di Periksa Tanggal:

Selesai Tgl. PT. SEECONS - INDEC Jo. Paraf :

Err:509
Kode Pengujian : /009/TA.04/2013 Jenis Contoh : LPA KLAS S
Paket Err:509 Terima Tgl. Err:509
Kontraktor Err:509 Metode Uji : SNI 1743:2008

PEMADATAN

MATERIAL : KOMBINASI LPA KLAS S TANGGAL :

BERAT TANAH BASAH gr

KADAR AIR MULA %

KADAR AIR AKHIR %

PENAMBAHAN AIR cc 225 300 375 400 475

BERAT ISI

1 BERAT CETAKAN gr 6187 6187 6187 6187 6187

2 B.TANAH BASAH+CETAKAN gr 10502 10847 11098 10953 10700

3 B.TANAH BASAH (2-1) gr 4315 4660 4911 4766 4513

4 ISI CETAKAN cm³ 2159.58 2159.58 2159.58 2159.58 2159.58

5 BERAT ISI BASAH (3/4) gr/cc 2.00 2.16 2.27 2.21 2.09

6 BERAT ISI KERING gr/cc 1.863 1.978 2.046 1.954 1.814 6

KADAR AIR

1 B.TANAH BASAH+CAWAN gr 100.3 99.8 103.1 107.2 102.5


B. TANAH
2 gr 94.5 92.6 94.4 96.7 90.8
KERING+CAWAN
3 BERAT AIR (1-2) gr 5.8 7.2 8.7 10.5 11.7

4 BERAT CAWAN gr 14.2 13.5 16.3 15.7 13.9

5 B.TANAH KERING (2-4) gr 80.3 79.1 78.1 81 76.9

6 KADAR AIR=(3/5)X 100% % 7.22 9.10 11.14 12.96 15.21

7 RATA-RATA 1 2 3 4 5
Berat Isi Kering (gr/cc)

2.25

2.15

γ D Max (t/m³)
2.05 ZERO AIR VOID

1.95

1.85

W Optimum (%)
1.75

1.65
6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00
Kadar Air (%)

Catatan :
Pemadatan Cara D
Berat Jenis = #REF! γD max t/m³ = 2.024 W Opt% = 11.15

Nama 0 Nama : Masdar, ST

Di Uji Mulai Tgl. 0 Di Periksa Tanggal :

Selesai Tgl. 0 Paraf :


Err:509
Kode Pengujian : /009/TA.01/2013 Jenis Cnth : LPA KLAS S
Paket Err:509 Terima Tgl. Err:509
Kontraktor Err:509 Metode Uji : SNI 1966:2008

ATTERBEREG

MATERIAL : KOMBINASI LPA KLAS S TANGGAL

BATAS CAIR BATAS PLASTIS


37
BANYAKNYA PUKULAN X 6 15 23 33

A NOMOR CAWAN 1 2 3 4 a b

B BERAT CAWAN gr 16.2 14.1 16.5 15.5 16.5 14.2

C BERAT CAWAN + CONTOH BASAH gr 59.1 51.8 47.6 45.3 96.3 91.5

D BERAT CAWAN + CONTOH KERING gr 50.5 44.6 41.9 40.1 84.4 80.0

E BERAT AIR E=C-D gr 8.6 7.20 5.7 5.2 11.9 11.5

F BERAT CONTOH KERING F=E-B gr 34.30 30.50 25.4 24.6 67.9 65.8

G KADAR AIR G=(E/F) X 100% % 25.07 23.61 22.44 21.14 17.53 17.48

Rata-rata 17.50

30.00 Batas Susut (S.L.)

No Cawan

Berat Cawan

25.00 Berat Cawan+Contoh Basah

Berat Cawan+Contoh Kering

Berat Air

Berat Contoh Kering (Wo)


20.00
Kadar Air (W)
Kadar Air (%)

Isi Contoh Basah (V)

Isi Contoh Kering (Vo)


15.00
S.L.=W-(V-V0/W0)X100%

Rata-rata
10.00

LL% PL% PI% SL% CATATAN

Contoh dlm

5.00 keadaan :
0 10 20 30 40 22.12 17.50 4.62
Asli/Krg udara
Banyak Pukulan
disaring/tidak

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. 0 Di Periksa Tanggal :

Selesai Tgl. 0 Paraf :


Err:509
Kode Pengujian : /009/TA.05/2013 Jenis Contoh : LPA KLAS B
Paket ### Terima Tgl. :
Kontraktor ### Description : Nilai CBR dan Kepadatan
Metode Uji : SNI 03-1744-1989

MATERIAL : KOMBINASI LPA KLAS B TANGGAL :

2.25 2.25

Berat Isi Kering (gr/cc)


Berat Isi Kering (gr/cc)

2.15 2.15

2.05 2.05

1.95 1.95

1.85 1.85
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 0 20 40 60 80 100 120

CBR
Kadar Air (%)

Cara Pemadatan : Pemadatan Berat Cara D

Berat Jenis Gabungan : #REF!

Kadar Air Optimum : 9.320 %

γD maximum : 2.043 t/m³

CBR 100% γD Max Penetrasi : 1" = 61 %

2" = 74.2 %

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Kode Pengujian : /009/TA.05/2013 Jenis Contoh : LPA KLAS B
Paket ### Terima Tgl. :
Kontraktor ### Description : CBR Laboratorium (65 X Pukulan)
Metode Uji : SNI 03-1744-1989

CBR LABORATORIUM

MATERIAL : KOMBINASI LPA KLAS B TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6833 6833

JAM B BERAT TANAH+CETAKAN 11835 11951

PEMBACAAN C BERAT TANAH BASAH 5002 5118

PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58


E BERAT ISI TANAH C/D 2.316 2.370
2300
F BERAT ISI KERING (E/100+M)X100% 2.124 2.146

2070
(65 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1840 0.25 0.0125 69

0.5 0.0250 169


1610
1 0.0500 321

1380 1.5 0.0750 469

2 0.1000 630 2598.0


1150 3 0.1500 853

4 0.2000 1103 4789.3


920
6 0.3000 1509
8 0.4000 1838
690
10 0.5000 2019

460 NILAI CBR

2598.0
230 0,1" X 100% = 86.60 %
3 X 1000

0 4789.3
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 106.43 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX 2 g2

H BERAT TIN BOX 15.5 14.2

I B.TIN BOX+T.BASAH 99.8 94.7

J B.TIN BOX+T.KERING 92.8 87.1


K BERAT TANAH KERING 77.3 72.9

L BERAT AIR = I-J 7 7.60000000000001

M KADAR AIR= L/K X 100% 9.06 10.43

RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Kode Pengujian : /009/TA.05/2013 Jenis Contoh : LPA KLAS B
Paket ### Terima Tgl. :
Kontraktor ### Description : CBR Laboratorium (35 X Pukulan)
Metode Uji : SNI 03-1744-1989

CBR LABORATORIUM

MATERIAL : KOMBINASI LPA KLAS B TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6896 6896

JAM B BERAT TANAH+CETAKAN 11689 11884

PEMBACAAN C BERAT TANAH BASAH 4793 4988

PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58

E BERAT ISI TANAH C/D 2.219 2.310


1600
F BERAT ISI KERING (E/100+M)X100% 2.035 2.017

1440
(35 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1280 0.25 0.0125 46

0.5 0.0250 116


1120
1 0.0500 168

1.5 0.0750 269


960
2 0.1000 398 1686.3

800 3 0.1500 564


4 0.2000 738 3115.8
640
6 0.3000 1008

8 0.4000 1202
480
10 0.5000 1284

320 NILAI CBR

1686.3
160 0,1" X 100% = 56.21 %
3 X 1000

0 3115.8
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 69.24 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX 2 c

H BERAT TIN BOX 15.5 15.6

I B.TIN BOX+T.BASAH 99.8 103.2

J B.TIN BOX+T.KERING 92.8 92.1

K BERAT TANAH KERING 77.3 76.5

L BERAT AIR = I-J 7 11.1


M KADAR AIR= L/K X 100% 9.06 14.51

RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Kode Pengujian : /009/TA.05/2013 Jenis Contoh : LPA KLAS B
Paket ### Terima Tgl. :
Kontraktor ### Description : CBR Laboratorium (10 X Pukulan)
Metode Uji : SNI 03-1744-1989
CBR LABORATORIUM

MATERIAL : KOMBINASI LPA KLAS B TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6781 6781

JAM B BERAT TANAH+CETAKAN 11209 11525

PEMBACAAN C BERAT TANAH BASAH 4428 4744


PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58

E BERAT ISI TANAH C/D 2.050 2.197


1000
F BERAT ISI KERING (E/100+M)X100% 1.880 1.857

900
(10 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
800 0.25 0.0125 41

0.5 0.0250 75
700
1 0.0500 137

1.5 0.0750 193


600
2 0.1000 281 1181.3

500 3 0.1500 372

4 0.2000 529 2208.5


400 6 0.3000 728

8 0.4000 811
300
10 0.5000 897

200 NILAI CBR

1181.3
100 0,1" X 100% = 39.38 %
3 X 1000

0 2208.5
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 49.08 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX 2 w5

H BERAT TIN BOX 15.5 15.2

I B.TIN BOX+T.BASAH 99.8 97.3

J B.TIN BOX+T.KERING 92.8 84.6

K BERAT TANAH KERING 77.3 69.4


L BERAT AIR = I-J 7 12.7

M KADAR AIR= L/K X 100% 9.06 18.30

RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Kode Pengujian : /009/TA.04/2013 Jenis Contoh : LPA KLAS B
Paket Err:509 Terima Tgl. :
Kontraktor Err:509 Metode Uji : SNI 1743:2008

PEMADATAN

MATERIAL : KOMBINASI LPA KLAS B TANGGAL :

BERAT TANAH BASAH gr

KADAR AIR MULA %

KADAR AIR AKHIR %

PENAMBAHAN AIR cc 150 225 300 375 450

BERAT ISI

1 BERAT CETAKAN gr 6154 6154 6154 6154 6154

2 B.TANAH BASAH+CETAKAN gr 10528 10811 11009 10966 10867

3 B.TANAH BASAH (2-1) gr 4374 4657 4855 4812 4713

4 ISI CETAKAN cm³ 2159.58 2159.58 2159.58 2159.58 2159.58

5 BERAT ISI BASAH (3/4) gr/cc 2.03 2.16 2.25 2.23 2.18

6 BERAT ISI KERING gr/cc 1.924 2.009 2.055 2.000 1.930 6

KADAR AIR

1 B.TANAH BASAH+CAWAN gr 101.5 99.3 99.5 99.9 100.2


B. TANAH
2 gr 97 93.5 92.3 91.1 90.2
KERING+CAWAN
3 BERAT AIR (1-2) gr 4.5 5.8 7.2 8.8 10

4 BERAT CAWAN gr 11.6 14.4 15.9 14.1 13.7

5 B.TANAH KERING (2-4) gr 85.4 79.1 76.4 77 76.5

6 KADAR AIR=(3/5)X 100% % 5.27 7.33 9.42 11.43 13.07

7 RATA-RATA 1 2 3 4 5
Berat Isi Kering (gr/cc)

2.25

2.20

2.15

2.10
ZERO AIR VOID
γ D Max (t/m³)
2.05

2.00

1.95 W Optimum (%)

1.90

1.85
4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00

Kadar Air (%)

Catatan :
Pemadatan Cara D
Berat Jenis = #REF! γD max t/m³ = 2.043 W Opt% = 9.32

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Kode Pengujian : /009/TA.01/2013 Jenis Cnth : LPA KLAS B
Paket Err:509 Terima Tgl. :
Kontraktor Err:509 Metode Uji : SNI 1966:2008

ATTERBEREG

MATERIAL : KOMBINASI LPA KLAS B TANGGAL

BATAS CAIR BATAS PLASTIS


37
BANYAKNYA PUKULAN X 13 26 33

A NOMOR CAWAN f g2 C s q

B BERAT CAWAN gr 14.2 14.6 13.2 15.5 14.6

C BERAT CAWAN + CONTOH BASAH gr 43.2 38.6 37.5 95.1 83.6

D BERAT CAWAN + CONTOH KERING gr 38 34.7 34.1 84.5 74.2

E BERAT AIR E=C-D gr 5.2 3.90 3.4 10.6 9.4

F BERAT CONTOH KERING F=E-B gr 23.80 20.10 20.9 69 59.6

G KADAR AIR G=(E/F) X 100% % 21.85 19.40 16.27 15.36 15.77

Rata-rata 15.57

30.00 Batas Susut (S.L.)

No Cawan

Berat Cawan
25.00
Berat Cawan+Contoh Basah

Berat Cawan+Contoh Kering

Berat Air
20.00
Berat Contoh Kering (Wo)

Kadar Air (W)


Kadar Air (%)

15.00 Isi Contoh Basah (V)

Isi Contoh Kering (Vo)

10.00 S.L.=W-(V-V0/W0)X100%

Rata-rata

5.00
LL% PL% PI% SL% CATATAN

Contoh dlm

0.00 keadaan :
0 10 20 30 40 18.81 15.57 3.24
Asli/Krg udara
Banyak Pukulan
disaring/tidak

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
JOB MIX FORMULA
LAPIS PONDASI AGREGAT KELAS 'A'
PAKET : REKONSTRUKSI JALAN KAWASAN PARIWISATA TORAJA 2
RUAS : LONDA - LOKOMATA
LOKASI : LABORATORIUM PT.GANGKING RAYA
TANGGAL : 24 JULI 2015

Split 2 - 3 Asal : Quarry Cendana


Split 1 - 2 Asal : Quarry Cendana
Split 0.5 - 1 Asal : Quarry Cendana
Abu - Batu : Quarry Cendana
Kondisi Material : Cleaned/Dry
Kapasitas Pencampur : 25 M3

BERAT PROPORSI VOLUME BUCKET JUMLAH BUCKET (MIX 25 m3 )


ISI LEPAS CAMPURAN EXCAVATOR WILL LOADER
JENIS MATERIAL
EXCAVATOR WILL LOADER
(gr/cmᶟ ) (%) (mᶟ) (mᶟ)
BUCKET BUCKET

SPLIT 2- 3 1.27 40 0.8 3.2 39.4 9.8

SPLIT 1 -2 1.26 10 0.8 3.2 9.9 2.5

SPLIT 0.5 - 1 1.27 15 0.8 3.2 14.8 3.7

ABU - BATU 1.45 35 0.8 3.2 30.2 7.5

Disetujui Oleh Diperiksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT 0 Err:509


Kooordinator Lapangan Quality Engineer Quality Control
UCKET (MIX 25 m3 )

WILL LOADER
BUCKET

9.8

2.5

3.7

7.5

aksanakan Oleh
raktor Pelaksana
.Gangking Raya

Err:509
Quality Control
JOB MIX FORMULA
LAPIS PONDASI AGREGAT KELAS 'A'
PAKET : REKONSTRUKSI JALAN KAWASAN PARIWISATA TORAJA 2
RUAS : LONDA - LOKOMATA
LOKASI : LABORATORIUM PT.GANGKING RAYA
TANGGAL : 24 JULI 2015

Split 2 - 3 Asal : Quarry Cendana


Split 1 - 2 Asal : Quarry Cendana
Split 0.5 - 1 Asal : Quarry Cendana
Abu - Batu : Quarry Cendana
Kondisi Material : Cleaned/Dry
Kapasitas Pencampur : 25 M3

BERAT PROPORSI VOLUME BUCKET JUMLAH BUCKET (MIX 25 m3 )


ISI LEPAS CAMPURAN EXCAVATOR WILL LOADER
JENIS MATERIAL
EXCAVATOR WILL LOADER
(gr/cmᶟ ) (%) (mᶟ) (mᶟ)
BUCKET BUCKET

SPLIT 2- 3 1.27 40 0.8 3.2 9.8 2.5

SPLIT 1 -2 1.26 10 0.8 3.2 2.5 0.6

SPLIT 0.5 - 1 1.27 15 0.8 3.2 3.7 0.9

ABU - BATU 1.45 35 0.8 3.2 7.5 1.9

Disetujui Oleh Diperiksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT 0 Err:509


Kooordinator Lapangan Quality Engineer Quality Control
UCKET (MIX 25 m3 )

WILL LOADER
BUCKET

2.5

0.6

0.9

1.9

aksanakan Oleh
raktor Pelaksana
.Gangking Raya

Err:509
Quality Control
JOB MIX FORMULA
LAPIS PONDASI AGREGAT KELAS 'S'
PAKET : REKONSTRUKSI JALAN KAWASAN PARIWISATA TORAJA 2
RUAS : LONDA - LOKOMATA
LOKASI : LABORATORIUM PT.GANGKING RAYA
TANGGAL : 24 JULI 2015

Split 2 - 3 Asal : Quarry Cendana


Split 1 - 2 Asal : Quarry Cendana
Split 0.5 - 1 Asal : Quarry Cendana
Abu - Batu : Quarry Cendana
Kondisi Material : Cleaned/Dry

BERAT PROPORSI
ISI LEPAS CAMPURAN
JENIS MATERIAL HITUNGAN ANALISIS BUCKET
(gr/cmᶟ ) (%)

SPLIT 2 - 3 1.27 40 31.5 41.8 4.0

SPLIT 1 -2 1.26 10 7.9 10.5 1.0


75.4
SPLIT 0.5 - 1 1.27 15 11.8 15.7 1.5

ABU - BATU 1.45 35 24.1 32.0 3.0

Disetujui Oleh Diperiksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT 0 Err:509


Kooordinator Lapangan Quality Engineer Quality Control
REPUBLIK INDONESIA
KEMENTERIAN PEKERJAAN UMUM
DIREKTORAT JENDERAL BINA MARGA
BALAI BESAR PELAKSANAAN JALAN NASIONAL XIII MAKASSAR

JOB MIX FORMULA


LAPIS PONDASI AGREGAT KELAS A
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SULAWESI SELATAN
PPK 15 ( JEMBATAN WILAYAH II SULAWESI SELATAN )

PAKET :
PENGGANTIAN JEMBATAN S. SALUBARANI, CS

PENGASPALAN OPRID JEMBATAN S. AWOTARAE

NOMOR KONTRAK : KU.08.08/PPK15/JBT-03/VI/2017


TANGGAL KONTRAK : 15 JUNI 2017
TAHUN ANGGARAN 2017

KONSULTAN SUPERVISI
PT. SEECONS - INDEC JO.

KONTRAKTOR PELAKSANA
PT. RAJASA TOMAX GLOBALINDO
BERITA ACARA PENGESAHAN
JOB MIX FORMULA DAN TRIAL MIX LPA. KLS A

Pada hari ini senin tanggal dua puluh november sampai dengan tanggal dua desember tahun dua ribu tujuh
belas telah dilaksanakan pengujian JOB MIX FORMULA DAN TRIAL MIX LPA. KLS A PAKET PENGGANTIAN
JEMBATAN SUNGAI SALOBARANI ,Cs ( PENGASPALAN OPRID JEMBATAN SUNGAI AWOTARAE )
Selanjutnya hasil dari pengujian tersebut dapat digunakan sebagai acuan pekerjaan dilapangan.

Di setujui oleh
PPK 15 JEMBATAN

WILAYAH II SULAWESI SELATAN

( Ir.Nasjuadil,MT )
Nip. 19690721 199903 1 005

Di periksa oleh Di laksanakan oleh


Konsultan Supervisi Kontraktor Pelaksana
PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

( Ir.Andi Iskandar ) ( Yosri Patala,ST )


Site Engineer General Superintendent
ANALISA SARINGAN
SNI 03 - 1968 - 1990

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. MATERIAL : BATU PECAH 2 -3


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE ) QUARRY : KAB.SOPPENG
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO TANGGAL UJI : 20 NOPEMBER 2017
KONSULTAN : PT. SEECON'S - INDEC Jo.

CONTOH I = 4000 Gram CONTOH II = 4100 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHAN TERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 1275 1275 31.88 68.13 68.15 452.0 1305.0 31.83 68.17
3/4" 2482 3110 77.75 22.25 22.36 2049.0 3179.0 77.54 22.46
1/2" 569 3754 93.85 6.15 6.55 813.0 3815.0 93.05 6.95
3/8" 35 4000 100.00 0.00 0.00 105.0 4100.0 100.00 0.00
No. 4
No. 8
No.10
No. 16
No. 30
No. 40
No. 50
No. 100
No. 200
Pan

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
ANALISA SARINGAN
SNI 03 - 1968 - 1990

MATERIAL :1 -2 TANGGAL :

CONTOH I = 2429.0 Gram CONTOH II = 3192.0 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 102 102 4.2 96 95.80 266.0 266.0 8.33 91.67
3/4" 1267 1369 56.36 43.64 37.56 1921.0 2187.0 68.52 31.48
1/2" 830.0 2199.0 90.53 9.47 7.77 811.0 2998.0 93.92 6.08
3/8" 218.0 2417.0 99.51 0.49 0.48 179.0 3177.0 99.53 0.47
No. 4 12.0 2429.0 100.00 0.00 0.00 15.0 3192.0 100.00 0.00
No. 8
No.10
No. 16
No. 30
No. 40
No. 50
No. 100
No. 200
Pan
ANALISA SARINGAN
SNI 03 - 1968 - 1990

MATERIAL : 0,5 - 1 TANGGAL :

CONTOH I = 2005.0 Gram CONTOH II = 2127.0 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 0 0 0 100 100 0 0 0 100
3/4" 0 0 0 100.00 100.00 0 0 0 100.00
1/2" 0 0 0 100.00 100.00 0 0 0 100.00
3/8" 67.0 67.0 3.34 96.66 97.46 37.0 37.0 1.74 98.26
No. 4 468.0 535.0 26.68 73.32 74.15 495.0 532.0 25.01 74.99
No. 8 791.0 1326.0 66.13 33.87 31.51 975.0 1507.0 70.85 29.15
No.10 92.0 1418.0 70.72 29.28 27.12 89.0 1596.0 75.04 24.96
No. 16 143.0 1561.0 77.86 22.14 20.45 132.0 1728.0 81.24 18.76
No. 30 123.0 1684.0 83.99 16.01 14.99 102.0 1830.0 86.04 13.96
No. 40 27.0 1711.0 85.34 14.66 13.84 20.0 1850.0 86.98 13.02
No. 50 44.0 1755.0 87.53 12.47 11.95 34.0 1884.0 88.58 11.42
No. 100 58.0 1813.0 90.42 9.58 9.40 47.0 1931.0 90.79 9.21
No. 200 59.0 1872.0 93.37 6.63 6.70 52 1983.0 93.23 6.77
Pan 133 2005.0 100.00 0.00 0.00 144 2127.0 100.00 0.00
ANALISA SARINGAN
SNI 03 - 1968 - 1990

MATERIAL : ABU BATU TANGGAL : 3 Mei 2011

CONTOH I = 1404 Gram CONTOH II = 1300 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 0 0 0 100 100 0 0 0 100
3/4" 0 0 0 100 100 0 0 0 100
1/2" 0 0 0 100 100 0 0 0 100
3/8" 7 7 0.50 99.50 99.44 8 8.00 0.62 99.38
No. 4 60 67 4.77 95.23 95.38 58.0 58.0 4.46 95.54
No. 8 271 338 24.07 75.93 75.62 263.0 321.0 24.69 75.31
No.10 125 463 32.98 67.02 67.13 105.0 426.0 32.77 67.23
No. 16 233 696 49.57 50.43 50.91 206.0 632.0 48.62 51.38
No. 30 267 963 68.59 31.41 32.94 220.0 852.0 65.54 34.46
No.40 62 1025 73.01 26.99 28.88 48.0 900.0 69.23 30.77
No. 50 89 1114 79.34 20.66 22.98 71.0 971.0 74.69 25.31
No. 100 105.0 1219 86.82 13.18 15.82 89.0 1060.0 81.54 18.46
No. 200 101.0 1320 94.02 5.98 9.76 64.0 1124.0 86.46 13.54
Pan 84 1404 100 0 0 176.0 1300 100 0
TRIAL MIX DESIGN LPA KELAS A
PAKET : REKONSTRUKSI JALAN KAWASAN PARIWISATA TORAJA 2
RUAS : LONDA - LOKOMATA
LOKASI : LABORATORIUM PT.GANGKING RAYA
TANGGAL : 30/06/2015

Split 2 - 3 Asal : Quarry Cendana


Split 1 - 2 Asal : Quarry Cendana
Split 0.5 - 1 Asal : Quarry Cendana
Abu - Batu : Quarry Cendana
Kondisi Material : Cleaned/Dry

PENAMBAHAN SPLIT 2 -3 SPLIT 1 - 2 SPLIT 0.5 - 1 ABU BATU Kapasitas mold


AIR (%) (%) (%) (%) (gram)
( ml )
40 10 15 35 5000

50 ml 2000 500 750 1750 Gram

100 ml 2000 500 750 1750 Gram

150 ml 2000 500 750 1750 Gram

Disetujui Oleh Diperiksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Kooordinator Lapangan Quality Engineer Quality Control
DESIGN LPA KELAS A

Calculation Of % Batch Total Spesification

No ABU 2-3 1-2 0,5-1 A. BATU PASIR Combined Daerah FULLER


2-3 1-2 0,5-1 PASIR Control
Saringan BATU 30 20 24 16 10 Gradation Larangan

B C D E F G H I J K MAX MIN MAX MIN

2" 50.000 100 100 100 100 100 30 20 24 16 10 100.00 - - - - -

11/2" 37.500 100 100 100 100 100 30 20 24 16 10 100.00 100 100 - -

1" 25.000 68.15 100 100 100 100 14.95 20 24 16 10 84.95 85 79 - - -

3/4" 19.000 22.36 90.72 100 100 100 6.71 18.14 24 16 10 74.85 - - - - -

1/2" 12.500 0 75.25 100 100 100 0.00 15.05 24 16 10 65.05 - - - - -

3/8" 9.500 0 27.14 96.05 100 98.34 0.00 5.43 23.05 16 9.83 54.31 58 44 - - -

No. 4 4.750 0 0 72.57 88.85 97.40 0 0 17.42 14.22 9.74 41.37 44 29 - - -

No. 8 2.360 0 0 21.68 82.75 95.97 0 0 5.20 13.24 9.60 28.04 - - - - -

No.10 2.000 0 0 18.45 55.82 95.30 0 0 4.43 8.93 9.53 22.89 30 17

No. 16 1.180 0 0 15.42 43.66 90.22 0 0 3.70 6.99 9.02 19.71 - - - -

No. 30 0.600 0 0 13.00 27.65 71.98 0 0 3.12 4.42 7.20 14.74 - - - - -

No.40 0.425 0 0 11.70 22.84 61.89 0 0 2.81 3.65 6.19 12.65 17 7

No. 50 0.300 0 0 11.25 16.44 39.36 0 0 2.70 2.63 3.94 9.27 - - - - -

No. 100 0.150 0 0 0 13.13 14.71 0 0 0.00 2.10 1.47 3.57 - - - - -

No. 200 0.075 0 0 0 9.90 7.31 0 0 0.00 1.58 0.73 2.32 8 2 - - -

No Sieve
100

90

Total Percent Passing (%)


80
No. 200 No.40 No. 40 No. 10 No 4 3/8" 3/8 1 11/2" 2"
0 65,62 65,62 65,6 " "
% % 2%
70

Control 60

50

Mix Design
40

30

20

10

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga 0 Err:509

0 0 Err:509
ABDUL RAJAB BASIR, ST 0 Quality Control
ANALISA SARINGAN
SNI 03 - 1968 - 1990

MATERIAL : Pasir TANGGAL : 1/7/2015

CONTOH I = 1030.0 Gram CONTOH II = 1479.0 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 0 0 0 100 100 0 0 0 100
3/4" 0 0 0.00 100.00 100.00 0.0 0.0 0.00 100.00
1/2" 0.0 0.0 0.00 100.00 100.00 0.0 0.0 0.00 100.00
3/8" 30.0 30.0 2.91 97.09 98.34 6.0 6.0 0.41 99.59
No. 4 11.0 41.0 3.98 96.02 97.40 12.0 18.0 1.22 98.78
No. 8 10.0 51.0 4.95 95.05 95.97 28 46.0 3.11 96.89
No.10 2 53.0 5.15 94.85 95.30 17 63.0 4.26 95.74
No. 16 42 95.0 9.22 90.78 90.22 90 153.0 10.34 89.66
No. 30 187 282.0 27.38 72.62 71.98 271 424.0 28.67 71.33
No. 40 97 379.0 36.80 63.20 61.89 159 583.0 39.42 60.58
No. 50 224 603.0 58.54 41.46 39.36 345 928.0 62.75 37.25
No. 100 259 862.0 83.69 16.31 14.71 357 1285.0 86.88 13.12
No. 200 80 942.0 91.46 8.54 7.31 104 1389.0 93.91 6.09
Pan 88 1030.0 100.00 0.00 0.00 90 1479.0 100.00 0.00
JMF
( JOB MIX FORMULA )
LAPIS PONDASI AGREGAT KELAS 'A'
ANALISA SARINGAN
SNI 03-1968-1990
AASHTO T 27-88

Paket : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs.


Material : Agregat Klass ' A ' Tanggal :
Lokasi : PT. RAJASA TOMAX GLOBALINDO Methode : Gradasi Basah
Sample No.1 Sample No.2
Weight Average
3066 Gram 3081 Gram

Retained Percentage Retained Percentage Percentage

Sieve Size Comulativ. Passing by Comulativ. Passing by Passing by Specification


Indiv. Ratio Indiv. Ratio
Weight Weight Weight Weight Weight Weight Weight
(g) (g)
Inch mm (g) (%) (%) (g) (%) (%) (%)

2" 50.0 0 0 0 100.00 0 0 0.00 100.00 100.00 100 - 100

1 1/2" 37.5 0 0 0.00 100.00 0 0 0.00 100.00 100.00 100 - 100

1" 25.4 487 487 15.88 84.12 469 469 15.22 84.78 84.45 79 - 85

3/8" 9.50 840 1327 43.28 56.72 879 1348 43.75 56.25 56.48 44 - 58

#4 4.75 395 1722 56.16 43.84 396 1744 56.60 43.40 43.62 29 - 44

#10 2.00 506 2228 72.67 27.33 502 2246 72.90 27.10 27.22 17 - 30

#40 0.425 517 2745 89.53 10.47 470 2716 88.15 11.85 11.16 7 - 17

#200 0.075 209 2954 96.35 3.65 260 2976 96.59 3.41 3.53 2 - 8
P a ssin g P ercen teg e (% )

CONTROL
CONTROL
100

90

80

70
COMBINED
COMBINED
GRADATION
GRADATION
60

50

40

30

20

10

0
Sieve Opening (mm)

No.200 No.40 No.10 No.4 ''3/8 "1 ''11/2 ''2

Disetujui Oleh Diperiksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga 0 0

0 0 0
0 0 Quality Control
ANALISA SARINGAN
SNI 03 - 1968 - 1990
MATERIAL :1 -2 TANGGAL :

CONTOH I = 3000.0 Gram CONTOH II = 4500.9 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 0 0 0 100 100 0 0 0 100
3/4" 281.5 281.5 9.38 90.62 90.72 412.9 412.9 9.17 90.83
1/2" 444.5 726.0 24.20 75.80 75.25 726.2 1139.1 25.31 74.69
3/8" 1426.2 2152.2 71.74 28.26 27.14 2191.0 3330.1 73.99 26.01
No. 4 847.8 3000.0 100.00 0.00 0.00 1170.8 4500.9 100.00 0.00
No. 8
No.10
No. 16
No. 30
No. 40
No. 50
No. 100
No. 200
Pan

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
ANALISA SARINGAN
SNI 03 - 1968 - 1990

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. MATERIAL : BATU PECAH 1 - 2


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE ) QUARRY : KAB.SOPPENG
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO TANGGAL UJI : 20 NOPEMBER 2017
KONSULTAN : PT. SEECON'S - INDEC Jo.

CONTOH I = 3900 Gram CONTOH II = 3850 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHAN TERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 1275 0 0 100 100.00 452.0 0 0 100
3/4" 2482 198 5.08 94.92 94.83 2049.0 203.0 5.27 94.73
1/2" 569 2675 68.59 31.41 31.52 813.0 2632.0 68.36 31.64
3/8" 35 3550 91.03 8.97 8.94 105.0 3507.0 91.09 8.91
No. 4 3825 98.08 1.92 2.00 3770.0 97.92 2.08
No. 8 3900 100.00 0.00 0.00 3850.0 100.00 0.00
No.10
No. 16
No. 30
No. 40
No. 50
No. 100
No. 200
Pan

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
ANALISA SARINGAN
SNI 03 - 1968 - 1990

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. MATERIAL : BATU PECAH 0,5-1


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE ) QUARRY : KAB.SOPPENG
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO TANGGAL UJI : 20 NOPEMBER 2017
KONSULTAN : PT. SEECON'S - INDEC Jo.

CONTOH I = 2000 Gram CONTOH II = 2100 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHAN TERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 1275 0 0 100 100.00 452.0 0 0 100
3/4" 2482 0 0.00 100.00 100.00 2049.0 0.0 0.00 100.00
1/2" 569 67 3.35 96.65 96.30 813.0 85.0 4.05 95.95
3/8" 35 760 38.00 62.00 61.74 105.0 809.0 38.52 61.48
No. 4 1890 94.50 5.50 5.61 1980.0 94.29 5.71
No. 8 2000 100.00 0.00 0.00 2100.0 100.00 0.00
No.10
No. 16
No. 30
No. 40
No. 50
No. 100
No. 200
Pan

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
ANALISA SARINGAN
SNI 03 - 1968 - 1990

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. MATERIAL : ABU - BATU


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE ) QUARRY : KAB.SOPPENG
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO TANGGAL UJI : 20 NOPEMBER 2017
KONSULTAN : PT. SEECON'S - INDEC Jo.

CONTOH I = 1200 Gram CONTOH II = 1250 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHAN TERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 1275 0 0 100 100.00 452.0 0 0 100
3/4" 2482 0 0.00 100.00 100.00 2049.0 0.0 0.00 100.00
1/2" 569 0 0.00 100.00 100.00 813.0 0.0 0.00 100.00
3/8" 35 0 0.00 100.00 100.00 105.0 0.0 0.00 100.00
No. 4 0 0.00 100.00 100.00 0.0 0.00 100.00
No. 8 360.6 30.05 69.95 70.11 371.7 29.74 70.26
No.10 427.3 35.61 64.39 65.06 428.5 34.28 65.72
No. 16 660.5 55.04 44.96 44.83 691.3 55.30 44.70
No. 30 838.9 69.91 30.09 30.27 869.4 69.55 30.45
No. 40 907.2 75.60 24.40 24.32 947.0 75.76 24.24
No. 50 956.6 79.72 20.28 21.52 965.6 77.25 22.75
No. 100 1055.0 87.92 12.08 13.04 1075.1 86.01 13.99
No. 200 1088.6 90.72 9.28 9.62 1125.6 90.05 9.95
Pan

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
ANALISA SARINGAN
SNI 03 - 1968 - 1990

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. MATERIAL : PASIR


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE ) QUARRY : KAB.SOPPENG
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO TANGGAL UJI : 20 NOPEMBER 2017
KONSULTAN : PT. SEECON'S - INDEC Jo.

CONTOH I = 1100 Gram CONTOH II = 1000 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHAN TERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 1275 0 0 100 100.00 452.0 0 0 100
3/4" 2482 0 0.00 100.00 100.00 2049.0 0.0 0.00 100.00
1/2" 569 0 0.00 100.00 100.00 813.0 0.0 0.00 100.00
3/8" 35 0 0.00 100.00 100.00 105.0 0.0 0.00 100.00
No. 4 29.8 2.71 97.29 97.11 30.8 3.08 96.92
No. 8 65.8 5.98 94.02 93.85 63.1 6.31 93.69
No.10 89.3 8.12 91.88 91.96 79.7 7.97 92.03
No. 16 169.3 15.39 84.61 84.81 149.8 14.98 85.02
No. 30 479.9 43.63 56.37 55.19 460.0 46.00 54.00
No. 40 865.5 78.68 21.32 21.38 785.6 78.56 21.44
No. 50 929.5 84.50 15.50 15.37 847.6 84.76 15.24
No. 100 1049.8 95.44 4.56 4.47 956.3 95.63 4.37
No. 200 1058.6 96.24 3.76 3.86 960.5 96.05 3.95
Pan

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
GRADASI AGREGAT GABUNGAN

LAPIS PONDASI AGREGAT KELAS A

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs. TANGGAL : 23 NOPEMBER 2017

( PENGASPALAN OPRID JEMBATAN S.AWOTARAE )

KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO

KONSULTAN : PT. SEECON'S - INDEC Jo.

Calculation Of % Batch Total Spesification

No ABU 2-3 1-2 0,5-1 A. BATU PASIR Combined Daerah FULLER


2-3 1-2 0,5-1 PASIR Control
Saringan BATU 30 20 15 25 10 Gradation Larangan

B C D E F G H I J K MAX MIN MAX MIN

2" 50.000 100 100 100 100 100 30 20 15 25 10 100.00 100 100 - - -

11/2" 37.500 100 100 100 100 100 30 20 15 25 10 100.00 100 100 - -

1" 25.000 68.15 100 100 100 100 14.95 20 15 25 10 84.95 85 79 - - -

3/8" 9.500 0 8.94 61.74 100 100 0 1.79 9.26 25 10 46.05 58 44 - - -

No. 4 4.750 0 0 5.61 100.0 97.11 0 0 0.84 25.00 9.71 35.55 44 29 - - -

No.10 2.000 0 0 18.45 65.06 91.96 0 0 2.77 16.26 9.20 28.23 30 17

No.40 0.425 0 0 0.00 24.32 21.38 0 0 0.00 6.08 2.14 8.22 17 7

No. 200 0.075 0 0 0 9.62 3.86 0 0 0.00 2.40 0.39 2.79 8 2 - - -

No Sieve No. 200 No.40 No. 10 No 4 3/8'' 1" 11/2" 2"


0 " 100

90

Total Percent Passing (%)


80

3/8"
65,6
Control 2% 70

60

50

Mix FORMULA 40

30

20

10

Diperiksa Oleh,
Disetujui Oleh, Dibuat dan dites oleh,
PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
Individual of Gradation % Passing Calculation Of % Batch Total Spesifacation

No ABU SIRTU 2-3 1-2 0,5-1 A. BATU PASIR Combined Daerah FULLER
SIRTU 2-3 1-2 0,5-1 PASIR Control
Saringan BATU 0 29 22 17 32 0 Gradation Larangan

A B C D E F G H I J K L MAX MIN MAX MIN

2" 50.000 100 100 100 100 100 100 0 29 22 17 32 0 100 100 100 - - -

11/2" 37.500 97.43 100 100 100 100 100 0 29 22 17 32 0 100 100 100 - - -

1" 25.000 86.36 84.12 100 100 100 100 0 24.39 22 17 32 0 95.39 85 79 - - -

3/8" 9.500 63.98 0.00 18.46 99.51 100.00 100 0 0.00 4.06 16.92 32 0 52.98 58 44 - - -

No. 4 4.750 55.61 0 0.00 36.42 100.00 96.73 0 0 0 6.19 32.00 0 38.19 44 29 - - -

No. 10 2.000 34.39 0 0 0.73 53.07 88.80 0 0 0 0.12 16.98 0 17.11 30 17 - - -

No. 40 0.600 15.29 0 0 0.00 34.98 65.11 0 0 0 0.00 11.19 0 11.19 17 7 - - -

No. 200 0.075 6.37 0 0 0.00 11.37 9.22 0 0 0 0.00 3.64 0 3.64 8 2 - - -

No Sieve
No. 200 No. 40 No 4 3/8" 1 11/2" 2"
65,62 65,6 " 100
% 2%

90

Total Percent Passing (%)


80
BATAS MAKSIMAL

70

MIX FORMULA

60

50

40

30

20

BATAS MINIMAL
10

Catatan :
BERAT JENIS GABUNGAN

MATERIAL : Lapis Pondasi Agregat KLS B TANGGAL : 14 Mei 2016

Nomor Pemeriksaan Bulk Semu Efektif Komposisi Campuran


A 2 -3 2.645 2.725 2.685 30
B 1-2 2.630 2.716 2.673 20
C 0,5- 1 2.621 2.706 2.664 15
abu batu 2.568 2.714 2.641 25
D pasir 2.555 2.698 2.626 10
Total 100

Berat Jenis Gabungan : 2.662 gr/cc


PERCOBAAN PEMADATAN
SNI 1734 : 2008

MATERIAL : KOMBINASI LPA KLAS A TANGGAL UJI : 24 DESEMBER 2017

BERAT TANAH BASAH gr


KADAR AIR MULA %
KADAR AIR AKHIR %
PENAMBAHAN AIR CC 75 150 225 300 375
BERAT ISI
1 BERAT CETAKAN gr 6061 6061 6061 6061 6061
2 B.TANAH BASAH+CETAKAN gr 10711 10938 11002 10894 10693
3 B.TANAH BASAH (2-1) gr 4650 4877 4941 4833 4632
4 VOLUME CETAKAN cm³ 2159.58 2159.58 2159.58 2159.58 2159.58
5 BERAT ISI BASAH (3/4) gr/cc 2.15 2.26 2.29 2.24 2.14
6 BERAT ISI KERING gr/cc 2.079 2.137 2.120 2.039 1.916 6
KADAR AIR
1 B.TANAH BASAH+CAWAN gr 99.6 97.9 103.6 98.5 104.2
2 B. TANAH KERING+CAWAN gr 96.6 93.3 96.9 90.9 94.4
3 BERAT AIR (1-2) gr 3 4.6 6.7 7.6 9.8
4 BERAT CAWAN gr 12.2 12.5 12.4 12.8 12.5
5 B.TANAH KERING (2-4) gr 84.4 80.8 84.5 78.1 81.9
6 KADAR AIR=(3/5)X 100% % 3.55 5.69 7.93 9.73 11.97
7 RATA-RATA 1 2 3 4 5
Berat Isi Kering (gr/cc)

2.40

2.30

2.20 ZERO AIR VOID


γ D Max (t/m³)

2.10

2.00

1.90 W Optimum (%)

1.80

1.70
1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00
Kadar Air (%)

Catatan :
Pemadatan Cara D
Berat Jenis = 2.662 gr/cc γD max = 2.135 t/m3 W Opt. = 6.5 %

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST

KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL


ATTERBEREG
SNI 1966: 2008

MATERIAL : KOMBINASI LPA KLAS A TANGGAL : 24 DESEMBER 2017

BATAS CAIR BATAS PLASTIS


12 18 28 37
BANYAKNYA PUKULAN
A NOMOR CAWAN
B BERAT CAWAN gr
C BERAT CAWAN + CONTOH BASAH gr
D BERAT CAWAN + CONTOH KERING gr
E BERAT AIR E=C-D gr
F BERAT CONTOH KERING F=E-B gr
G KADAR AIR G=(E/F) X 100% %
Rata-rata
40.00 Batas Susut (S.L.)

No Cawan

35.00 Berat Cawan

Berat Cawan+Contoh Basah

30.00 Berat Cawan+Contoh Kering

Berat Air

25.00 Berat Contoh Kering (Wo)

NON PLASTIS Kadar Air (W)


Kadar Air (%)

20.00 Isi Contoh Basah (V)

Isi Contoh Kering (Vo)

15.00
S.L.=W-(V-V0/W0)X100%

10.00 Rata-rata

5.00 LL% PL% PI% SL% CATATAN

Contoh dlm

0.00 keadaan :
10 20 30 40
Asli/Krg udara
Banyak Pukulan
disaring/tidak

Diperiksa Oleh,
Disetujui Oleh, Dibuat dan dites oleh,
PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
CBR LABORATORIUM
SNI 03 - 1744 1989

MATERIAL : KOMBINASI LPA KLAS A TANGGAL UJI : 28 DESEMBER 2017

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL 12/25/2018 12/26/2018 12/27/2018 12/28/2018 A BERAT CETAKAN 6839 6839

JAM B BERAT TANAH+CETAKAN 11851 11999

PEMBACAAN C BERAT TANAH BASAH 5012 5160

PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58


E BERAT ISI TANAH C/D 2.321 2.389
1800
F BERAT ISI KERING (E/100+M)X100% 2.179 2.210

1620 (65 X Pukulan)


PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1440 0.25 0.0125 95

0.5 0.0250 181


1260
1 0.0500 276

1080 1.5 0.0750 382

2 0.1000 473 1994.5


900 3 0.1500 636

4 0.2000 856 3586.6


720
6 0.3000 1135

8 0.4000 1431
540
10 0.5000 1539

360 NILAI CBR

1994.5
180 0,1" X 100% = 66.48 %
3 X 1000

0 3586.6
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 79.70 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX A C.2


H BERAT TIN BOX 15.1 14.6

I B.TIN BOX+T.BASAH 100.3 98.6

J B.TIN BOX+T.KERING 95.1 92.3

K BERAT TANAH KERING 80 77.7


L BERAT AIR = I-J 5.2 6.3

M KADAR AIR= L/K X 100% 6.50 8.11

RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
CBR LABORATORIUM
SNI 03 - 1744 1989

MATERIAL : KOMBINASI LPA KLAS A TANGGAL UJI : 28 DESEMBER 2017

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL 12/25/2018 12/26/2018 12/27/2018 12/28/2018 A BERAT CETAKAN 6870 6870


JAM B BERAT TANAH+CETAKAN 11716 11863

PEMBACAAN C BERAT TANAH BASAH 4846 4993

PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58

E BERAT ISI TANAH C/D 2.244 2.312


1400
F BERAT ISI KERING (E/100+M)X100% 2.107 2.097

1260 (35 X Pukulan)


PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1120 0.25 0.0125 63

0.5 0.0250 100


980
1 0.0500 166

1.5 0.0750 262


840
2 0.1000 372 1557.9

700 3 0.1500 509

4 0.2000 682 2824.8


560
6 0.3000 923

8 0.4000 1061
420
10 0.5000 1182

280 NILAI CBR

1557.9
140 0,1" X 100% = 51.93 %
3 X 1000

0 2824.8
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 62.77 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX A D.1

H BERAT TIN BOX 15.1 15.3

I B.TIN BOX+T.BASAH 100.3 94.9

J B.TIN BOX+T.KERING 95.1 87.5

K BERAT TANAH KERING 80 72.2

L BERAT AIR = I-J 5.2 7.40000000000001


M KADAR AIR= L/K X 100% 6.50 10.25

RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
CBR LABORATORIUM
SNI 03 - 1744 1989

MATERIAL : KOMBINASI LPA KLAS A TANGGAL UJI : 28 DESEMBER 2017

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL 12/25/2018 12/26/2018 12/27/2018 12/28/2018 A BERAT CETAKAN 6865 6865


JAM B BERAT TANAH+CETAKAN 10985 11322

PEMBACAAN C BERAT TANAH BASAH 4120 4457

PERUBAHAN D VOLUME CETAKAN 2159.58 2159.58

E BERAT ISI TANAH C/D 1.908 2.064


1000
F BERAT ISI KERING (E/100+M)X100% 1.791 1.833

900
(10 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
800 0.25 0.0125 55
0.5 0.0250 86
700
1 0.0500 129

1.5 0.0750 196


600
2 0.1000 272 1100.0

500 3 0.1500 363

4 0.2000 451 1947.4


400 6 0.3000 621

8 0.4000 728
300
10 0.5000 801

200 NILAI CBR

1100.0
100 0,1" X 100% = 36.67 %
3 X 1000

0 1947.4
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 43.28 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX A B.1

H BERAT TIN BOX 15.1 14.4

I B.TIN BOX+T.BASAH 100.3 98.6


J B.TIN BOX+T.KERING 95.1 89.2

K BERAT TANAH KERING 80 74.8

L BERAT AIR = I-J 5.2 9.39999999999999

M KADAR AIR= L/K X 100% 6.50 12.57


RATA-RATA

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA

WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
ANALISA SARINGAN
SNI 03 - 1968 - 1990
MATERIAL : Sirtu TANGGAL :

CONTOH I = 6400 Gram CONTOH II = 5200 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 976 976 15.25 84.75 84.75 943 943 18.13 81.87
3/4" 734 1710 26.72 73.28 72.81 495.0 1438.0 27.65 72.35
1/2" 455 2165 33.83 66.17 67.38 195.0 1633.0 31.40 68.60
3/8" 565 2730 42.66 57.34 57.86 531.0 2164.0 41.62 58.38
No. 4 725 3455 53.98 46.02 46.86 555.0 2719.0 52.29 47.71
No. 8 798 4253 66.45 33.55 34.09 680 3399.0 65.37 34.63
No.10 325 4578 71.53 28.47 30.01 160 3559.0 68.44 31.56
No. 16 322 4900 76.56 23.44 24.61 300 3859.0 74.21 25.79
No. 30 402 5302 82.84 17.16 17.67 395 4254.0 81.81 18.19
No. 40 175 5477 85.58 14.42 15.13 122 4376.0 84.15 15.85
No. 50 273 5750 89.84 10.16 10.99 209 4585.0 88.17 11.83
No. 100 285 6035 94.30 5.70 6.05 282 4867.0 93.60 6.40
No. 200 176 6211 97.05 2.95 3.14 160 5027.0 96.67 3.33
Pan 189 6400 100.00 0.00 0.00 173 5200.0 100.00 0.00

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : ABU - BATU TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11366.7 11356.7
C BERAT AGREGAT = B-A gr 4561.7 4551.7
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.352 1.349
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.350
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11479.7 11561.2
C BERAT AGREGAT = B-A gr 4674.7 4756.2
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.385 1.409
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.397

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : ABU - BATU TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11366.7 11356.7
C BERAT AGREGAT = B-A gr 4561.7 4551.7
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.352 1.349
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.350
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11479.7 11561.2
C BERAT AGREGAT = B-A gr 4674.7 4756.2
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.385 1.409
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.397

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : ABU - BATU TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11366.7 11356.7
C BERAT AGREGAT = B-A gr 4561.7 4551.7
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.352 1.349
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.350
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11479.7 11561.2
C BERAT AGREGAT = B-A gr 4674.7 4756.2
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.385 1.409
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.397

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : Split 0,5 -1 TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11252.9 11244.9
C BERAT AGREGAT = B-A gr 4447.9 4439.9
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.318 1.316
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.317
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11386.7 11366.2
C BERAT AGREGAT = B-A gr 4581.7 4561.2
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.358 1.351
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.355

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : Split 1 - 2 TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11242.9 11222.6
C BERAT AGREGAT = B-A gr 4437.9 4417.6
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.315 1.309
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.312
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11346.9 11390.7
C BERAT AGREGAT = B-A gr 4541.9 4585.7
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.346 1.359
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.352

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : Split 2-3 TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11217.9 11207.7
C BERAT AGREGAT = B-A gr 4412.9 4402.7
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.308 1.305
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.306
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11386.8 11365.9
C BERAT AGREGAT = B-A gr 4581.8 4560.9
D VOLUME CONTAINER cm³ 3375 3375
E BERAT ISI AGREGAT = C/D gr/cm³ 1.358 1.351
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.354

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
ANGULARITAS KASAR
Dot.s PTM No 621
Material : SPLIT 1 - 2 Tanggal :

PENGUJIAN
NO URAIAN SATU BIDANG PECAH DUA BIDANG PECAH
ATAU LEBIH ATAU LEBIH

1. Berat contoh sebelum uji + takaran (A) 3530.3 3530.3

2. Berat contoh setelah uji + takaran (B) 3428.8 3341.8

3. Berat takaran (C) 641.9 641.9

4. Berat contoh sebelum uji (A-C)=(D) 2888.4 2888.4

5. Berat contoh setelah uji (B-C)=(E) 2786.9 2699.9

6. Nilai Angularitas ( E / D ) x 100% 96.5 93.5

PENGUJIAN NILAI

Spesifikasi Angularitas agregat kasar 95/90

95/90 menunjukan bahwa 95% agregat kasar mempunyai muka bidang pecah satu atau lebih dan 90% agregat kasar mempunyai muka bidang
pecah dua atau lebih

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
ANGULARITAS KASAR
Dot.s PTM No 621
Material : SPLIT 2 - 3 Tanggal :

PENGUJIAN
NO URAIAN SATU BIDANG PECAH DUA BIDANG PECAH
ATAU LEBIH ATAU LEBIH

1. Berat contoh sebelum uji + takaran (A) 3540.3 3540.3

2. Berat contoh setelah uji + takaran (B) 3473.8 3395.4

3. Berat takaran (C) 641.9 641.9

4. Berat contoh sebelum uji (A-C)=(D) 2898.4 2898.4

5. Berat contoh setelah uji (B-C)=(E) 2831.9 2753.5

6. Nilai Angularitas ( E / D ) x 100% 97.7 95.0

PENGUJIAN NILAI

Spesifikasi Angularitas agregat kasar 95/90

95/90 menunjukan bahwa 95% agregat kasar mempunyai muka bidang pecah satu atau lebih dan 90% agregat kasar mempunyai muka bidang
pecah dua atau lebih

Disetujui Oleh Di periksa Oleh Dilaksanakan Oleh


Direksi Konsultan Supervisi Kontraktor Pelaksana
P.U Bina Marga PT.Wira Guna Tani PT.Gangking Raya

Ajitomo Wibowo.ST.MT Hasrina Amin.ST Yakobus.P.ST


Koordinator Lapangan Quality Engineer Quality Control
DESIGN CBR LABORATORIUM
SNI 03-1744-1989

MATERIAL : KOMBINASI LPA KLAS A TANGGAL : 30 DESEMBER 2017

2.35

2.35
Berat Isi Kering (gr/cc)

Berat Isi Kering (gr/cc)


2.25

2.25

2.15

2.15

2.05

2.05

1.95

1.95

1.85
30 60 90 120 150 180

CBR (%)
1.85
2.00 4.00 6.00Kadar Air (%)8.00 10.00 12.00

Cara Pemadatan : Pemadatan Berat Cara D

Berat Jenis Gabungan : 2.662 gr/cc

Kadar Air Optimum : 6.50 %

γD maximum : 2.135 t/m³

CBR 100% γD Max Penetrasi : 1" = 94.1 %

2" = 113.3 %

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST

KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL


Err:509 : Jenis Cont Err:509
Paket ### Terima Tgl.Err:509
Kontraktor ### Description: CBR Laboratorium (65 X Pukulan)
Metode Uji : SNI 03-1744-1989

CBR LABORATORIUM

MATERIAL Err:509 TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6823 6823

JAM B BERAT TANAH+CETAKAN 11844 11924


PEMBACAAN C BERAT TANAH BASAH 5021 5101

PERUBAHAN D VOLUME CETAKAN 2159.6 2159.6

E BERAT ISI TANAH C/D 2.325 2.362


2800
F BERAT ISI KERING (E/100+M)X100% 2.182 2.182

2520
(65 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
2240 0.25 0.0125 123

0.5 0.0250 282


1960
1 0.0500 436

1.5 0.0750 631


1680
2 0.1000 829 3531.0

1400 3 0.1500 1125

4 0.2000 1503 6355.8


1120 6 0.3000 1990

8 0.4000 2311
840
10 0.5000 2603

560 NILAI CBR

3531.0
280 0,1" X 100% = 117.70 %
3 X 1000

0 6355.8
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 141.24 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX y b

H BERAT TIN BOX 12.3 12.6

I B.TIN BOX+T.BASAH 98.2 76.1

J B.TIN BOX+T.KERING 92.9 71.25

K BERAT TANAH KERING 80.6 58.7

L BERAT AIR = I-J 5.3 4.84999999999999

M KADAR AIR= L/K X 100% 6.58 8.27

RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
Err:509 : Jenis Cont Err:509
Paket ### Terima Tgl.Err:509
Kontraktor ### Description: CBR Laboratorium (35 X Pukulan)
Metode Uji : SNI 03-1744-1989

CBR LABORATORIUM

MATERIAL Err:509 TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6819 6819

JAM B BERAT TANAH+CETAKAN 11705 11835


PEMBACAAN C BERAT TANAH BASAH 4886 5016

PERUBAHAN D VOLUME CETAKAN 2159.6 2159.6

E BERAT ISI TANAH C/D 2.262 2.323


2000
F BERAT ISI KERING (E/100+M)X100% 2.123 2.082

1800
(35 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1600 0.25 0.0125 113

0.5 0.0250 199


1400
1 0.0500 325

1.5 0.0750 485


1200
2 0.1000 629 2576.6

1000 3 0.1500 852


4 0.2000 1079 4626.7
800 6 0.3000 1411

8 0.4000 1681
600
10 0.5000 1781

400 NILAI CBR

2576.6
200 0,1" X 100% = 85.89 %
3 X 1000

0 4626.7
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 102.82 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX y n

H BERAT TIN BOX 12.3 12.6

I B.TIN BOX+T.BASAH 98.2 99.3

J B.TIN BOX+T.KERING 92.9 90.3

K BERAT TANAH KERING 80.6 77.7


L BERAT AIR = I-J 5.3 9

M KADAR AIR= L/K X 100% 6.58 11.58

RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
KEAUSAN AGREGAT (ABRASI)
SNI 03 - 2417 - 1991

MATERIAL : Agregat Kasar TANGGAL :

GRADASI SARINGAN NOMOR CONTOH

LOLOS TERTAHAN I II

3/4" 1/2" 2500

1/2" 3/8" 2500

NOMOR CONTOH I II

BERAT SEBELUM (A) 5000 gram 5000 gram

BERAT SETELAH DIAYAK SARINGAN NO 12 (B) 3575.4 gram 3565.2 gram

BERAT SESUDAH (A)-(B) 1424.6 gram 1434.8 gram

KEAUSAN = (A-B)/Ax100% 28.492 % 28.696 %

KEAUSAN RATA-RATA 28.594 %

UKURAN SARINGAN BERAT AGREGAT

LOLOS TERTAHAN A B C D

1 1/2" 1" 1250

1" 3/4" 1250

3/4" 1/2" 1250 2500

1/2" 3/8" 1250 2500

3/8" 1/4" 2500

1/4" NO.4 2500

NO.4 NO.8 5000

TOTAL 5000 5000 5000 5000

JUMLAH BOLA BAJA 12 11 8 6


Err:509 : /009/TA.04/2012 Jenis Cont Err:509
Paket ### Terima Tgl.Err:509
Kontraktor ### Description: CBR Laboratorium (10 X Pukulan)
Metode Uji : SNI 03-1744-1989

CBR LABORATORIUM

MATERIAL Err:509 TANGGAL :

PENGUJIAN KEPADATAN : RINGAN/BERAT BERAT ISI YANG DIKEHENDAKI :………………………………gr/cm³

PEGEMBANGAN BERAT ISI SEBELUM SESUDAH

TANGGAL A BERAT CETAKAN 6914 6914

JAM B BERAT TANAH+CETAKAN 11541 11731

PEMBACAAN C BERAT TANAH BASAH 4627 4817

PERUBAHAN D VOLUME CETAKAN 2159.6 2159.6

E BERAT ISI TANAH C/D 2.143 2.231


1800
F BERAT ISI KERING (E/100+M)X100% 2.010 1.909

1620
(10 X Pukulan)
PENURUNAN PEMBACAAN DIAL BEBAN
WAKTU (MIN)
(INCH) (DIV) (LBS)
1440 0.25 0.0125 77

0.5 0.0250 153


1260
1 0.0500 238

1.5 0.0750 340


1080
2 0.1000 491 2054.4
900 3 0.1500 662
4 0.2000 869 3638.0
720
6 0.3000 1154

8 0.4000 1395
540
10 0.5000 1481

360 NILAI CBR

2054.4
180 0,1" X 100% = 68.48 %
3 X 1000

0 3638.0
0.00 0.10 0.20 0.30 0.40 0.50 0,2" X 100% = 80.84 %
3 X 1500

KADAR AIR SEBELUM SESUDAH

G NOMOR TIN BOX y v

H BERAT TIN BOX 12.3 12.2


I B.TIN BOX+T.BASAH 98.2 100.3

J B.TIN BOX+T.KERING 92.9 87.6

K BERAT TANAH KERING 80.6 75.4

L BERAT AIR = I-J 5.3 12.7

M KADAR AIR= L/K X 100% 6.58 16.84


RATA-RATA

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
0 : Jenis Contoh : Aspal Keras
Paket 0 Terima Tgl. 0
Kontraktor Err:509 Metode Uji : SNI 06-2432-1991

DAKTILITAS

MATERIAL : Aspal Minyak TANGGAL :

PERSIAPAN

Contoh dipanaskan

Mulai jam : 08.00 Temp pemanasan : 120 °C

Selesai jam : 08.30

Contoh didiamkan

Mulai jam : 08.30 Temp ruang : 29 °C

Selesai jam : 09.25

Contoh didinginkan pada temp 25°C

Mulai jam : 09.25 Temp tetap : 25 °C

Selesai jam : 10.30

PEMERIKSAAN DAKTILITAS

NO WAKTU PUTUS ( MENIT ) PANJANG PUTUS ( CM )

I II I II

A 134 138

RATA-RATA > 136

Persyaratan umum pada temp 25°C, 5cm/, ≥100

Nama : MUH. SYUKUR Nama :

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

0
0 : Jenis Contoh : Aspal Keras
Paket 0 Terima Tgl. 0
Kontraktor Err:509 Metode Uji : SNI 06-2441-1991

BERAT JENIS ASPAL

MATERIAL : Aspal Minyak TANGGAL :

PERSIAPAN

Contoh dipanaskan

Mulai jam : 08.00 Temp pemanasan : 110 °C

Selesai jam : 08.30

Contoh didiamkan

Mulai jam : 08.30 Temp ruang : 25 °C

Selesai jam : 09.25

Contoh direndam pada temp 25°C

Mulai jam : 10.25 Temp tetap : 25 °C

Selesai jam : 11.30

PEMERIKSAAN

A Nomor picnometer I II

B Berat picnometer 38.5 gram 40 gram

C Berat picnometer+air penuh 64.2 gram 66.8 gram

D Berat air (C-B) 25.7 gram 26.8 gram

E Berat picnometer+Aspal 50.9 gram 52.6 gram

F Berat aspal (E-B) 12.4 gram 12.6 gram

G Berat picnometer+aspal+air 64.6 gram 67.2 gram

H Isi air (G-E) 13.7 gram 14.6 gram

I Isi contoh (D-H) 12 gram 12.2 gram

J Berat Jenis (F/I) 1.033 gram 1.033 gram

Rata-Rata 1.033 gram

Persyaratan umum pada temp 25°C, Minimal=1

Nama : MUH. SYUKUR Nama :

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

0
Err:509 : Jenis Contoh : Aspal Keras
Paket 0 Terima Tgl. 0
Kontraktor Err:509 Metode Uji : SNI 06-2456-1991

PENETRASI

MATERIAL : Aspal Minyak TANGGAL :

PERSIAPAN

Contoh dipanaskan

Mulai jam : 08.00 Temp pemanasan : 120 °C

Selesai jam : 08.30

Contoh didiamkan

Mulai jam : 08.30 Temp ruang : 29 °C

Selesai jam : 09.25

Pemeriksaan Penetrasi

Mulai jam : 11.25 Temp tetap : 25 °C

Selesai jam : 11.30

PEMERIKSAAN

Penetrasi pada suhu 25°C Container

beban 100 gram selama 5 detik I II

A Pengamatan 1 63 64

2 64 65

3 66 65

4 64 64

5 64 63

B Rata-rata 64.2 64.2

C Pen. Rata-rata 64.2

D Jenis Aspal PEN 40 PEN 60 PEN 80

E Penetrasi Umum 40 - 59 60 - 70 80 - 99

Persyaratan umum pada temp 25°C, 100 gr,5 detik, 0.1 mm

Nama : MUH. SYUKUR Nama :

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

0
Err:509 : Jenis Contoh : Aspal Keras

Paket Err:509 Terima Tgl. 0


Kontraktor Err:509 Metode Uji : SNI 06-2434-1991

TITIK LEMBEK

MATERIAL : Aspal Keras TANGGAL :

PERSIAPAN

Contoh dipanaskan

Mulai jam : 08.00 Temp pemanasan : 110 °C

Selesai jam : 08.30

Contoh didiamkan

Mulai jam : 08.30 Temp ruang : 25 °C

Selesai jam : 09.25

Contoh didinginkan pada temp 5°C

Mulai jam : 09.25 Temp tetap : 5 °C

Selesai jam : 10.30

PEMERIKSAAN

NO SUHU YANG DIAMATI ( °C ) WAKTU BENDA UJI ( DETIK )

I II

1 5

2 10 60 60

3 15 120 120

4 20 180 180

5 25 242 242

6 30 300 300

7 35 360 360

8 40 420 420

9 45 482 482

10 50 544 542

11 55 - -

SUHU PADA SAAT BOLA JATUH 51.2 °C 50.6 °C

RATA-RATA SUHU 50.9 °C

Persyaratan umum pada temp 25°C, ≥ 48 °C

Nama : MUH. SYUKUR Nama :

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0
0 : Jenis Contoh :
Paket 0 Terima Tgl. 0
Kontraktor 0 Desciption : Marshall AC - WC
Metode Uji : SNI 06-2489-1991

BJ Curah Agregat (Gsb) : #REF! GMM: 2.357 BJ Efektif Agregat (Gse) : 2.567 BJ Aspal (Gb) : 1.033 Abs.Aspl : #REF!

Tanggal Nomor Kadar Aspal Berat Benda Uji Isi Brt Jenis Stabilitas
Berat Isi Marshall Kadar
Produksi Benda thd Brt thd Brt di dlm Permukaan Benda Maksimum VIM VMA VFB Bacaan thd Kalib thd Korela Flow
Kering Benda Uji Quotient Aspal Eff
Uji Campuran Agregat Air Jenuh Air Uji Teoritis pd Alat rasi Alat si Volume
(%) (%) (gram) (gram) (gram) (cc) (%) (%) (%) (kg) (kg) (mm) (kg/mm) %
1 5.00 5.26 1172.0 642.9 1179.6 536.7 2.39 2.18 8.62 #REF! #REF! 582 1397 1341 3.34 401 #REF!
2 5.00 5.26 1179.0 651.2 1186.6 535.4 2.39 2.20 7.85 #REF! #REF! 496 1190 1143 3.10 369 #REF!
3 5.00 5.26 1167.9 652.0 1173.3 521.3 2.39 2.24 6.24 #REF! #REF! 592 1421 1421 3.29 432 #REF!
Rata2 2.39 2.21 7.57 #REF! #REF! 1302 3.24 401 #REF!
1 5.50 5.82 1189.1 662.5 1192.2 529.7 2.37 2.24 5.41 #REF! #REF! 681 1634 1569 3.45 455 #REF!
2 5.50 5.82 1187.8 662.4 1194.5 532.1 2.37 2.23 5.94 #REF! #REF! 630 1512 1452 3.26 445 #REF!
3 5.50 5.82 1192.3 666.3 1199.8 533.5 2.37 2.23 5.83 #REF! #REF! 690 1656 1590 3.55 448 #REF!
Rata2 2.37 2.24 5.72 #REF! #REF! 1537 3.42 449 #REF!
1 6.00 6.38 1188.9 669.1 1196.3 527.2 2.36 2.26 4.32 #REF! #REF! 698 1675 1675 3.66 458 #REF!
2 6.00 6.38 1187.3 666.2 1195.5 529.3 2.36 2.24 4.83 #REF! #REF! 698 1675 1675 3.78 443 #REF!
3 6.00 6.38 1192.0 673.2 1201.1 527.9 2.36 2.26 4.20 #REF! #REF! 687 1649 1649 3.69 447 #REF!
Rata2 2.36 2.25 4.45 #REF! #REF! 1666 3.71 449 #REF!
1 6.50 6.95 1189.5 668.0 1195.5 527.5 2.34 2.25 3.68 #REF! #REF! 684 1642 1642 4.01 409 #REF!
2 6.50 6.95 1183.1 667.2 1193.4 526.2 2.34 2.25 3.96 #REF! #REF! 724 1738 1738 4.03 431 #REF!
3 6.50 6.95 1192.2 671.1 1199.6 528.5 2.34 2.26 3.64 #REF! #REF! 636 1526 1526 4.20 363 #REF!
Rata2 2.34 2.25 3.76 #REF! #REF! 1635 4.08 401 #REF!
1 7.00 7.53 1190.1 672.1 1201.1 529.0 2.33 2.25 3.25 #REF! #REF! 588 1411 1411 4.19 337 #REF!
2 7.00 7.53 1188.8 669.1 1196.3 527.2 2.33 2.25 3.03 #REF! #REF! 571 1370 1370 4.04 339 #REF!
3 7.00 7.53 1182.4 670.0 1194.3 524.3 2.33 2.26 3.01 #REF! #REF! 569 1366 1366 4.95 276 #REF!
Rata2 2.33 2.25 3.10 #REF! #REF! 1382 4.39 317 #REF!
Min 3.5 14 65 800 3 250
Syarat
Max 5 - - - - -

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
0 : Jenis Contoh :
Paket 0 Terima Tgl. 0
Kontraktor 0 Desciption : Marshall AC - WC

Metode Uji : SNI 06-2489-1991

Grafik Hubungan Kadar Aspal Dengan Berat Isi Grafik Hubungan Kadar Aspal Dengan VIM
2.40 11.00

Berat Isi
10.00
2.35
9.00
2.30 8.00

VIM
7.00
2.25
6.00
2.20 5.00
6.20
4.00
2.15
3.00
2.10 2.00
4.50 5.00 5.50 6.00 6.50 7.00 7.50 4.50 5.00 5.50 6.00 6.50 7.00 7.50
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan VMA Grafik Hubungan Kadar Aspal Dengan VFB
20.00 90.00

19.00
80.00
VMA

VFB
18.00
70.00
17.00
60.00
16.00

15.00 50.00

14.00 40.00
4.50 5.00 5.50 6.00 6.50 7.00 7.50 4.50 5.00 5.50 6.00 6.50 7.00 7.50
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan Stabilitas Grafik Hubungan Kadar Aspal Dengan Flow
5.00
1800
Stabilitas

1600 Flow 4.50

1400
4.00
1200
3.50
1000
3.00
800

600 2.50
4.50 5.00 5.50 6.00 6.50 7.00 7.50 4.50 5.00 5.50 6.00 6.50 7.00 7.50
Kadar Aspal Kadar Aspal
M arh all Q u o tien t

Kadar Aspal
Parameter

Grafik Hubungan Kadar Aspal Dengan Marshall Quotient 4.50 5.00 5.50 6.00 6.50 7.00 7.50
Berat12
Isi
500

450 10
VIM

400 8
VMA
Grafik Hubungan Kadar Aspal Dengan Marshall Quotient

Param
M arh al
12
500

450 10

400 8
350
6
VFB
300
Stabilitas4
250
Flow2
200
4.50 5.00 5.50 6.00 6.50 7.00 7.50 0
MQ
Kadar Aspal 6.20
%

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
0 : Metode Design : SNI 13-2834-2000
Paket 0 Terima Tgl. 0

Kontraktor 0 Desciption : Design AC WC

Individual of Gradation % Passing Calculation Of % Batch Total Spesifacation

No ABU SIRTU 2-3 1-2 0,5-1 A. BATU KAPUR Combined Gradasi Gradasi FULLER
SIRTU 2-3 1-2 0,5-1 KAPUR
Saringan BATU 0 0 12 40 46 2 Gradation Kasar

A B D E F G H J K L MAX MIN MAX MIN

2" 50.000 100 100 100 Err:509 100 Err:509 0 0 12 Err:509 46 Err:509 Err:509 - - - - -

11/2" 37.500 100 100 100 Err:509 100 Err:509 0 0 12 Err:509 46 Err:509 Err:509 - - - - -

1" 25.000 100 68.15 100 100 100 Err:509 0 0 12 40 46 Err:509 Err:509 - - - - -

3/4" 19.000 100 22.36 100 100 100 Err:509 0 0 12 40 46 Err:509 Err:509 100 100 100 100 100

1/2" 12.500 100 7 7.77 Err:509 100 Err:509 0 0 0.93 Err:509 46 Err:509 Err:509 100 90 100 90 82.83

3/8" 9.500 100 0 0.48 Err:509 99 Err:509 0 0 0.06 Err:509 46 Err:509 Err:509 90 72 90 72 73.20

No. 4 4.750 100 0 0.00 Err:509 95.38 Err:509 0 0 0 Err:509 43.88 Err:509 Err:509 69 54 63 43 53.59

No. 8 2.360 100 0 0 Err:509 75.62 Err:509 0 0 0 Err:509 34.78 Err:509 Err:509 53 39.1 39.1 28 39.12

N6.10 2.000 100 0 0 Err:509 67.13 Err:509 0 0 0 Err:509 30.88 Err:509 Err:509 - - - - 36.31

No. 16 1.180 100 0 0 Err:509 50.91 Err:509 0 0 0 Err:509 23.42 Err:509 Err:509 40 31.6 25.6 19 28.64

No. 30 0.600 100 0 0 Err:509 32.94 Err:509 0 0 0 Err:509 15.15 Err:509 Err:509 30 23 19.1 13 21.12

No.40 0.425 100 0 0 Err:509 28.88 Err:509 0 0 0 Err:509 13.29 Err:509 Err:509 - - - - 18.09

No. 50 0.300 100 0 0 Err:509 22.98 Err:509 0 0 0 Err:509 10.57 Err:509 Err:509 22 15.5 15.5 9 15.46

No. 100 0.150 100 0 0 Err:509 15.82 Err:509 0 0 0 Err:509 7.28 Err:509 Err:509 15 9 13 6 11.32

No. 200 0.075 100 0 0 Err:509 9.76 Err:509 0 0 0 Err:509 4.49 Err:509 Err:509 10 4 10 4 8.29

No Sieve
No. No. No.50 No. 30 No. 16 No. 8 No 4 3/8" 1/2" 3/4" 1 11/2" 2"
200 100 65,62 65,6 65,62 " 100
% 2% %

90

Total Percent Passing (%)


Fuller Line

80
Batas Control

70
Mix Design

60

50

40

30

20

10

- Menggunakan Gradasi Kasar

Catatan : Disarankan untuk material yang tertahan saringan 3/4" harus dibuang

Nama : JUHSENISTO.ST Nama : MASDAR,ST

Di Uji Mulai Tgl. : Tanggal :

Selesai Tgl. : Paraf :


Err:509
Kode Pengujia: Jenis Contoh : AC- WC
Paket 0 Terima Tgl. 0
Kontraktor 0 Metode Uji :

GMM

MATERIAL : Campuran Aspal Panas (AC-WC) TANGGAL :

A Nomor picnometer I II

B Berat picnometer 1646 gram

C Berat picnometer+air penuh 4852 gram

D Berat picnometer+campuran 4860 gram

E Berat campuran 3214 gram

F Berat picnometer+campuran+air 6702.4 gram

G Volume campuran 1363.6 gram

H GMM 2.357 gram

Rata-Rata 2.357 gram

Nama : JUHSENISTO,ST Nama : MASDAR. ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl : Paraf :

0
: Design AC BC

Individual of Gradation % Passing Calculation Of % Batch Total Spesifacation

No ABU SIRTU 2-3 1-2 0,5-1 A. BATU KAPUR Combined Gradasi Gradasi FULLER
SIRTU 2-3 1-2 0,5-1 KAPUR
Saringan BATU 0 7 13 35 43 2 Gradation Halus Kasar

A B D E F G H J K L MIN MAX MIN

2" 50.000 100 100 100 Err:509 100 Err:509 0 7 13 Err:509 43 Err:509 Err:509 - - - - -

11/2" 37.500 100 100 100 Err:509 100 Err:509 0 7 13 Err:509 43 Err:509 Err:509 - - - - -

1" 25.000 100 100 100 100 100 Err:509 0 7 13 35 43 Err:509 Err:509 100 100 100 100 100

3/4" 19.000 100 22.36 37.56 Err:509 100 Err:509 0 1.56 4.88 Err:509 43 Err:509 Err:509 100 90 100 90 88.38

1/2" 12.500 100 7 7.77 Err:509 100 Err:509 0 0 1.01 Err:509 43 Err:509 Err:509 90 74 90 71 73.20

3/8" 9.500 100 0 0.48 Err:509 99 Err:509 0 0 0.06 Err:509 43 Err:509 Err:509 82 64 80 58 64.70

No. 4 4.750 100 0 0.00 Err:509 95.38 Err:509 0 0 0 Err:509 41.01 Err:509 Err:509 64 47 56 37 47.36

No. 8 2.360 100 0 0 Err:509 75.62 Err:509 0 0 0 Err:509 32.52 Err:509 Err:509 49 34.6 34.6 23 34.57

No.10 2.000 100 0 0 Err:509 67.13 Err:509 0 0 0 Err:509 28.86 Err:509 Err:509 - - - - 32.09

No. 16 1.180 100 0 0 Err:509 50.91 Err:509 0 0 0 Err:509 21.89 Err:509 Err:509 38 28.3 22.3 15 25.31

No. 30 0.600 100 0 0 Err:509 32.94 Err:509 0 0 0 Err:509 14.16 Err:509 Err:509 28 20.7 16.7 10 18.67

No.40 0.425 100 0 0 Err:509 28.88 Err:509 0 0 0 Err:509 12.42 Err:509 Err:509 - - - - 15.98

No. 50 0.300 100 0 0 Err:509 22.98 Err:509 0 0 0 Err:509 9.88 Err:509 Err:509 20 13.7 13.7 7 13.67

No. 100 0.150 100 0 0 Err:509 15.82 Err:509 0 0 0 Err:509 6.80 Err:509 Err:509 13 9 11 5 10.00

No. 200 0.075 100 0 0 Err:509 9.76 Err:509 0 0 0 Err:509 4.20 Err:509 Err:509 8 4 8 4 7.32

No Sieve
No. 200 No. 100 No.50 No. 30 No. 16 No. 8 No 4 3/8" 1/2" 3/4" 1 11/2 2"
65,62 % 65,62 % 65,62 65,6 " " 100
% 2% 65,6
2%

90

Total Percent Passing (%)


80

Fuller Line

70
Control

Mix Design 60

50

40

30

20

10

- Menggunakan Gradasi Kasar


Catatan : Disarankan untuk Material yang tertahan Saringan No. 1" harus dibuang

Nama : JUHSENISTO.ST Nama : MASDAR, ST

Di Uji Mulai Tgl. : Tanggal :

Selesai Tgl. : Paraf :

Err:509
: Jenis Contoh :
0 Terima Tgl. 0
0 Desciption : Marshall AC - BC
Metode Uji : SNI 06-2489-1991

BJ Agregat Gabungan(Gsb) : #REF! GMM : 2.369 BJ Efektif Agregat (Gse) : 2.562 BJ Aspal Minyak (Gb) : 1.033 Abs.Aspl : #REF!

Kadar Aspal Berat Benda Uji Isi Brt Jenis Stabilitas


Berat Isi Marshall Kadar Aspal
thd Brt thd Brt di dlm Permukaan Benda Maksimum VIM VMA VFB Bacaan thd Kalib thd Korela Flow
Kering Benda Uji Quotient Eff
Campuran Agregat Air Jenuh Air Uji Teoritis pd Alat rasi Alat si Volume
(%) (%) (gram) (gram) (gram) (cc) (%) (%) (%) (kg) (kg) (mm) (kg/mm) %
4.50 4.71 1175.5 654.1 1180.8 526.7 2.402 2.232 7.08 #REF! #REF! 765 1836 1763 3.30 534 #REF!
4.50 4.71 1184.4 660.5 1187.4 526.9 2.402 2.248 6.41 #REF! #REF! 689 1654 1587 3.31 480 #REF!
4.50 4.71 1189.7 667.1 1191.4 524.3 2.402 2.269 5.53 #REF! #REF! 574 1378 1322 3.24 408 #REF!
2.402 2.250 6.34 #REF! #REF! 1558 3.28 474 #REF!
5.00 5.26 1186.3 665.9 1189.5 523.6 2.385 2.266 5.02 #REF! #REF! 733 1759 1689 3.24 521 #REF!
5.00 5.26 1182.6 661.4 1189.7 528.3 2.385 2.239 6.16 #REF! #REF! 765 1836 1763 3.10 569 #REF!
5.00 5.26 1192.9 674.1 1196.1 522.0 2.385 2.285 4.20 #REF! #REF! 669 1606 1606 2.99 537 #REF!
2.385 2.263 5.12 #REF! #REF! 1686 3.11 542 #REF!
5.50 5.82 1176.6 678.5 1198.6 520.1 2.369 2.262 4.51 #REF! #REF! 865 2076 2076 3.14 661 #REF!
5.50 5.82 1098.2 619.3 1102.5 483.2 2.369 2.273 4.06 #REF! #REF! 785 1884 2054 3.20 642 #REF!
5.50 5.82 1189.0 672.5 1192.9 520.4 2.369 2.285 3.56 #REF! #REF! 804 1930 1930 3.33 579 #REF!
2.369 2.273 4.04 #REF! #REF! 2020 3.22 627 #REF!
6.00 6.38 1162.2 663.4 1175.1 511.7 2.353 2.271 3.47 #REF! #REF! 709 1702 1702 3.33 511 #REF!
6.00 6.38 1159.6 654.7 1164.1 509.4 2.353 2.276 3.25 #REF! #REF! 723 1735 1805 3.47 520 #REF!
6.00 6.38 1192.8 664.9 1197.1 532.2 2.353 2.241 4.74 #REF! #REF! 687 1649 1583 4.00 396 #REF!
2.353 2.263 3.82 #REF! #REF! 1696 3.60 476 #REF!
6.50 6.95 1158.6 651.6 1163.7 512.1 2.337 2.262 3.19 #REF! #REF! 654 1570 1570 4.30 365 #REF!
6.50 6.95 1154.0 650.0 1159.5 509.5 2.337 2.265 3.08 #REF! #REF! 630 1512 1572 4.24 371 #REF!
6.50 6.95 1180.8 662.9 1186.9 524.0 2.337 2.253 3.58 #REF! #REF! 723 1735 1735 3.64 477 #REF!
2.34 2.26 3.28 #REF! #REF! 1626 4.06 404 #REF!
Min 3.5 14 63 800 3 250
Syarat
Max 5 - - - - -

Nama : JUHSENISTO,ST Nama : Masdar, ST

Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0 : Jenis Contoh :
Paket 0 Terima Tgl. 0
Kontraktor 0 Desciption : Marshall AC - BC
Metode Uji : SNI 06-2489-1991

5.54 5.54
Grafik Hubungan Kadar Aspal Dengan Berat Isi Grafik Hubungan Kadar Aspal Dengan VIM
9.00 2.14 2.275
Berat Isi

2.380 1 4.2
8.00
2.350 13.5 14.5
7.00
2.320 40 71.8

VIM
6.00
2.290 1870
600
5.00
2.260
2.5 3.2
2.230 4.00
200 571
2.200 3.00
5.4
2.170 2.00
2.140 1.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan VMA Grafik Hubungan Kadar Aspal Dengan VFB
18.00 90.00
17.50 85.00
17.00 80.00
VMA

16.50 75.00
VFB

16.00 70.00
15.50 65.00
60.00
15.00
55.00
14.50
50.00
14.00
45.00
13.50 40.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan Stabilitas Grafik Hubungan Kadar Aspal Dengan Flow
2400 5
Stabilitas

2200
4.5
2000
Flow

1800 .
4
1600
1400
3.5
1200
1000 3
800
600 2.5
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4 4.5 5 5.5 6 6.5 7
Kadar Aspal Kadar Aspal
Marh all Q uotien t

Kadar Aspal
Parameter

Grafik Hubungan Kadar Aspal Dengan Marshall Quotient 4.00 4.50 5.00 5.50 6.00 6.50 7.00
12Isi
Berat
750
700 10
VIM
650
600 8
VMA
550
500 6
VFB
450
400
4
Stabilitas
350
300
2
Flow
250
200
0
MQ
4.00 4.50 5.00 5.50 6.00 6.50 7.00 5.54
Kadar Aspal
%

Nama : JUHSENISTO,ST Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

0
: Jenis Contoh :
0 Terima Tgl. 0
0 Desciption : Marshall AC - BC Laveling
Metode Uji : SNI 06-2489-1991

BJ Agregat Gabungan(Gsb) : #REF! GMM : 2.371 BJ Efektif Agregat (Gse) : 2.564 BJ Aspal Minyak (Gb) : 1.033 Abs.Aspl : #REF!

Kadar Aspal Berat Benda Uji Isi Brt Jenis Stabilitas


Berat Isi Marshall Kadar Aspal
thd Brt thd Brt di dlm Permukaan Benda Maksimum VIM VMA VFB Bacaan thd Kalib thd Korela Flow
Kering Benda Uji Quotient Eff
Campuran Agregat Air Jenuh Air Uji Teoritis pd Alat rasi Alat si Volume
(%) (%) (gram) (gram) (gram) (cc) (%) (%) (%) (kg) (kg) (mm) (kg/mm) %
4.50 4.71 1175.5 654.1 1180.8 526.7 2.404 2.232 7.16 #REF! #REF! 765 1836 1763 3.30 534 #REF!
4.50 4.71 1184.4 660.5 1187.4 526.9 2.404 2.248 6.49 #REF! #REF! 689 1654 1587 3.31 480 #REF!
4.50 4.71 1189.7 667.1 1191.4 524.3 2.404 2.269 5.61 #REF! #REF! 574 1378 1322 3.24 408 #REF!
2.404 2.250 6.42 #REF! #REF! 1558 3.28 474 #REF!
5.00 5.26 1186.3 665.9 1189.5 523.6 2.387 2.266 5.10 #REF! #REF! 733 1759 1689 3.24 521 #REF!
5.00 5.26 1182.6 661.4 1189.7 528.3 2.387 2.239 6.24 #REF! #REF! 765 1836 1763 3.10 569 #REF!
5.00 5.26 1192.9 674.1 1196.1 522.0 2.387 2.285 4.28 #REF! #REF! 669 1606 1606 2.99 537 #REF!
2.387 2.263 5.20 #REF! #REF! 1686 3.11 542 #REF!
5.50 5.82 1176.6 678.5 1198.6 520.1 2.371 2.262 4.59 #REF! #REF! 865 2076 2076 3.14 661 #REF!
5.50 5.82 1098.2 619.3 1102.5 483.2 2.371 2.273 4.14 #REF! #REF! 785 1884 2054 3.20 642 #REF!
5.50 5.82 1189.0 672.5 1192.9 520.4 2.371 2.285 3.64 #REF! #REF! 804 1930 1930 3.33 579 #REF!
2.371 2.273 4.12 #REF! #REF! 2020 3.22 627 #REF!
6.00 6.38 1162.2 663.4 1175.1 511.7 2.355 2.271 3.55 #REF! #REF! 709 1702 1702 3.33 511 #REF!
6.00 6.38 1159.6 654.3 1164.1 509.8 2.355 2.275 3.41 #REF! #REF! 723 1735 1805 3.47 520 #REF!
6.00 6.38 1192.8 674.9 1197.1 522.2 2.355 2.284 3.00 #REF! #REF! 687 1649 1583 4.00 396 #REF!
2.355 2.277 3.32 #REF! #REF! 1696 3.60 476 #REF!
6.50 6.95 1158.6 651.6 1163.7 512.1 2.339 2.262 3.27 #REF! #REF! 654 1570 1570 4.30 365 #REF!
6.50 6.95 1154.0 653.2 1159.5 506.3 2.339 2.279 2.55 #REF! #REF! 630 1512 1572 4.24 371 #REF!
6.50 6.95 1180.8 662.9 1186.9 524.0 2.339 2.253 3.66 #REF! #REF! 723 1735 1735 3.64 477 #REF!
2.34 2.27 3.16 #REF! #REF! 1626 4.06 404 #REF!
Min 3.5 14 63 800 3 250
Syarat
Max 5 - - - - -

Nama : JUHSENISTO,ST Nama : Masdar, ST

Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


0 : Jenis Contoh :
Paket 0 Terima Tgl. 0
Kontraktor 0 Desciption : Marshall AC - BC Laveling
Metode Uji : SNI 06-2489-1991

5.54 5.5
Grafik Hubungan Kadar Aspal Dengan Berat Isi Grafik Hubungan Kadar Aspal Dengan VIM
9.00 2.14 2.28
Berat Isi

2.380 1 3.91
8.00
2.350 13.5 14.25
7.00
2.320 40 72.7

VIM
6.00
2.290 1870
600
5.00
2.260
2.5 3.81
2.230 4.00
200 571
2.200 3.00
5.4
2.170 2.00
2.140 1.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan VMA Grafik Hubungan Kadar Aspal Dengan VFB
18.00 90.00
17.50 85.00
17.00 80.00
VMA

16.50 75.00
VFB

16.00 70.00
15.50 65.00
60.00
15.00
55.00
14.50
50.00
14.00
45.00
13.50 40.00
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4.00 4.50 5.00 5.50 6.00 6.50 7.00
Kadar Aspal Kadar Aspal

Grafik Hubungan Kadar Aspal Dengan Stabilitas Grafik Hubungan Kadar Aspal Dengan Flow
2400 5
Stabilitas

2200
4.5
2000
Flow

1800 .
4
1600
1400
3.5
1200
1000 3
800
600 2.5
4.00 4.50 5.00 5.50 6.00 6.50 7.00 4 4.5 5 5.5 6 6.5 7
Kadar Aspal Kadar Aspal
Marhall Q uo tien t

Kadar Aspal
Parameter

Grafik Hubungan Kadar Aspal Dengan Marshall Quotient 4.00 4.50 5.00 5.50 6.00 6.50 7.00
12Isi
Berat
750
700 10
VIM
650
600 8
VMA
550
500 6
VFB
450
400
4
Stabilitas
350
300
2
Flow
250
200
0
MQ
4.00 4.50 5.00 5.50 6.00 6.50 7.00
Kadar Aspal 5.5 %

Nama : JUHSENISTO,ST Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

0
0 : Metode Design : SNI 13-2834-2000
Paket 0 Terima Tgl. :

Kontraktor 0 Desciption : Design AC BC Leveling

Individual of Gradation % Passing Calculation Of % Batch Total Spesifacation

No ABU SIRTU 2-3 1-2 0,5-1 A. BATU KAPUR Combined Gradasi Gradasi FULLER
SIRTU 2-3 1-2 0,5-1 KAPUR
Saringan BATU 0 8 15 33 42 2 Gradation Halus Kasar

A B D E F G H J K L MIN MAX MIN

2" 50.000 100 100 100 Err:509 100 Err:509 0 8 15 Err:509 42 Err:509 Err:509 - - - - -

11/2" 37.500 100 100 100 Err:509 100 Err:509 0 8 15 Err:509 42 Err:509 Err:509 - - - - -

1" 25.000 100 100 100 100 100 Err:509 0 8 15 33 42 Err:509 Err:509 100 100 100 100 100

3/4" 19.000 100 22.36 37.56 Err:509 100 Err:509 0 1.79 5.63 Err:509 42 Err:509 Err:509 100 90 100 90 88.38

1/2" 12.500 100 7 7.77 Err:509 100 Err:509 0 1 1.17 Err:509 42 Err:509 Err:509 90 74 90 71 73.20

3/8" 9.500 100 0 0.48 Err:509 99 Err:509 0 0 0.07 Err:509 42 Err:509 Err:509 82 64 80 58 64.70

No. 4 4.750 100 0 0.00 Err:509 95.38 Err:509 0 0 0 Err:509 40.06 Err:509 Err:509 64 47 56 37 47.36

No. 8 2.360 100 0 0 Err:509 75.62 Err:509 0 0 0 Err:509 31.76 Err:509 Err:509 49 34.6 34.6 23 34.57

No.10 2.000 100 0 0 Err:509 67.13 Err:509 0 0 0 Err:509 28.19 Err:509 Err:509 - - - - 32.09

No. 16 1.180 100 0 0 Err:509 50.91 Err:509 0 0 0 Err:509 21.38 Err:509 Err:509 38 28.3 22.3 15 25.31

No. 30 0.600 100 0 0 Err:509 32.94 Err:509 0 0 0 Err:509 13.83 Err:509 Err:509 28 20.7 16.7 10 18.67

No.40 0.425 100 0 0 Err:509 28.88 Err:509 0 0 0 Err:509 12.13 Err:509 Err:509 - - - - 15.98

No. 50 0.300 100 0 0 Err:509 22.98 Err:509 0 0 0 Err:509 9.65 Err:509 Err:509 20 13.7 13.7 7 13.67

No. 100 0.150 100 0 0 Err:509 15.82 Err:509 0 0 0 Err:509 6.64 Err:509 Err:509 13 9 11 5 10.00

No. 200 0.075 100 0 0 Err:509 9.76 Err:509 0 0 0 Err:509 4.10 Err:509 Err:509 8 4 8 4 7.32

No Sieve
No. 200 No. 100 No.50 No. 30 No. 16 No. 8 No 4 3/8" 1/2" 3/4" 1 11/2 2"
65,62 % 65,62 % 65,62 65,6 " " 100
% 2% 65,6
2%

90

Total Percent Passing (%)


80

Fuller Line

70
Control

Mix Design 60

50

40

30

20

10

- Menggunakan Gradasi Kasar


Catatan : Disarankan untuk Material yang tertahan Saringan No. 1" harus dibuang

Nama : JUHSENISTO.ST Nama : MASDAR, ST

Di Uji Mulai Tgl. : Tanggal :

Selesai Tgl. : Paraf :

Err:509
Kode Pengujian : Jenis Contoh : AC- BC
Paket 0 Terima Tgl. Err:509
Kontraktor 0 Metode Uji :

GMM

MATERIAL : Campuran Aspal Panas (AC-BC) TANGGAL :

A Nomor picnometer I II

B Berat picnometer 1601 gram gram

C Berat picnometer+air penuh 4851 gram gram

D Berat picnometer+campuran 4662 gram gram

E Berat campuran 3061 gram gram

F Berat picnometer+campuran+air 6619.9 gram gram

G Volume campuran 1292.1 gram gram

H GMM 2.369 gram gram

Rata-Rata 2.369

Nama : JUHSENISTO,ST Nama : MASDAR. ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl : Paraf :

0
Err:509 : Jenis Contoh : SIRTU
Paket Err:509 Terima Tgl. Err:509
Kontraktor Err:509 Metode Uji : SNI 1969-2008

BERAT JENIS

MATERIAL : SIRTU KASAR TANGGAL :

Nomor Pemeriksaan I II Rata-Rata

A Berat contoh kering 6585.7 4376.2 5481.0

B Berat contoh jenuh kering permukaan (SSD) 6675.6 4438 5556.8

C Berat contoh dalam air 4183.1 2775.1 3479.1

D Berat jenis bulk = A/(B-C) 2.64 2.63 2.64

E BJ. Jenuh kering permukaan = B/(B-C) 2.68 2.67 2.67

F Berat jenis semu = A/(A-C) 2.74 2.73 2.74

G Penyerapan = (B-A)/Ax100% 1.37 1.41 1.39

MATERIAL : SIRTU HALUS TANGGAL :

Nomor Pemeriksaan I II Rata-rata

A Berat contoh jenuh permukaan (SSD-500) 209.60 355.50 282.55

B Berat contoh kering 205.20 348.10 276.65

C Berat labu+air temperatur 25°C 668.20 666.90 667.55

D Berat labu+contoh(SSD)+air temperatur 25°C 796.90 885.80 841.35

E Berat jenis bulk = B/(C+500-D) 2.54 2.55 2.54

F BJ. Jenuh kering permukaan = 500/(C+500-D) 2.59 2.60 2.60

G Berat jenis semu = B/(C+B-D) 2.68 2.69 2.69

H Penyerapan = (500-B)/Bx100% 2.14 2.13 2.14

Nomor Pemeriksaan Sirtu Kasar Sirtu Halus Rata-Rata

A Berat Jenis Bulk 2.64 2.54 2.59

B BJ.Jenuh kering permukaan 2.67 2.60 2.64

C Berat Jenis Semu 2.74 2.69 2.71

D Penyerapan 1.39 2.14 1.76

PERSYARATAN UMUM
Absorpsion :
Berat Jenis :

Nama : SAMSIR, ST Nama : MASDAR. ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


BERAT JENIS
SNI 03 - 1969 - 1990

MATERIAL : Split 0,5 - 1 TANGGAL :

Nomor Pemeriksaan I II Rata-Rata

A Berat contoh kering 5385.9 5386.9 5386.4

B Berat contoh jenuh kering permukaan (SSD) 5500.4 5500.2 5500.3

C Berat contoh dalam air 3422.9 3425.9 3424.4

D Berat jenis bulk = A/(B-C) 2.592 2.597 2.595

E BJ. Jenuh kering permukaan = B/(B-C) 2.648 2.652 2.650

F Berat jenis semu = A/(A-C) 2.744 2.747 2.745

G Penyerapan = (B-A)/Ax100% 2.126 2.103 2.115

PERSYARATAN UMUM
Absorpsion :
Berat Jenis :
BERAT JENIS
SNI 03 - 1969 - 1990

MATERIAL : Split 1-2 TANGGAL

Nomor Pemeriksaan I II Rata-rata

A Berat contoh kering 7933.9 7839.9 7886.9

B Berat contoh jenuh kering permukaan (SSD) 8100.9 8000.1 8050.5

C Berat contoh dalam air 5038.4 4985.4 5011.9

D Berat jenis bulk = A/(B-C) 2.591 2.601 2.596

E BJ. Jenuh kering permukaan = B/(B-C) 2.645 2.654 2.649

F Berat jenis semu = A/(A-C) 2.740 2.747 2.743


G Penyerapan = (B-A)/Ax100% 2.105 2.043 2.074

PERSYARATAN UMUM
Absorpsion :
Berat Jenis :
BERAT JENIS
SNI 03 - 1969 - 1990

MATERIAL : Split 2 - 3 TANGGAL :

Nomor Pemeriksaan I II Rata-Rata

A Berat contoh kering 8349.9 8349.9 8349.9

B Berat contoh jenuh kering permukaan (SSD) 8500.1 8500.2 8500.15

C Berat contoh dalam air 5298.1 5296.4 5297.3

D Berat jenis bulk = A/(B-C) 2.608 2.606 2.607

E BJ. Jenuh kering permukaan = B/(B-C) 2.655 2.653 2.654

F Berat jenis semu = A/(A-C) 2.736 2.735 2.735

G Penyerapan = (B-A)/Ax100% 1.799 1.800 1.799

PERSYARATAN UMUM
Absorpsion :
Berat Jenis :
BERAT JENIS
SNI 03 - 1970 - 1990

MATERIAL : Abu - batu TANGGAL :

Nomor Pemeriksaan I II Rata-Rata

A Berat contoh jenuh kering permukaan (SSD) 500.8 500.8 500.8

B Berat contoh kering 489.7 489.5 489.6

C Berat labu + air temperatur 25 ͦC 658.4 671.6 665.0

D Berat labu + contoh (SSD) +air temperatur 25 ͦC 971.2 983.9 977.6

E Berat Jenis Bulk = B/(C+500-D) 2.605 2.597 2.601

F BJ. Jenuh permukaan = 500/(C+500-D) 2.664 2.657 2.660

G Berat Jenis Semu = B/(C+B-D) 2.768 2.762 2.765

H Penyerapan = (500-B)/BX100% 2.267 2.308 2.288

PERSYARATAN UMUM
Absorpsion :
Berat Jenis :
Err:509 : Jenis Conto: Abu Batu
Paket Err:509 Terima Tgl. Err:509
Kontraktor Err:509 Metode Uji : SNI 03-4428-1997

PENGUJIAN AGREGAT HALUS ATAU SETARA PASIR

MATERIAL ABU BATU TANGGAL :

NOMOR PEMERIKSAAN I II RATA-RATA

TERA TINGGI TANGKAI PETUNJUK


A 10.0 10.0 10.0
BEBAN KE DALAM GELAS UKUR

B BACA SKALA LUMPUR 4.2 4.0 4.1

MASUKAN BEBAN,BACA SKALA


C 13.4 13.3 13.4
BEBAN PADA TANGKAI PETUNJUK

D BACA SKALA PASIR (C-A) 3.40 3.30 3.35

E NILAI SETARA PASIR (D/B)X 100 80.95 82.50 81.73

PENGUJIAN AGREGAT HALUS ATAU SETARA PASIR

MATERIAL : PASIR TANGGAL :

Nomor Pemeriksaan I II Rata-Rata

TERA TINGGI TANGKAI PETUNJUK


A
BEBAN KE DALAM GELAS UKUR

B BACA SKALA LUMPUR

MASUKAN BEBAN,BACA SKALA


C
BEBAN PADA TANGKAI PETUNJUK

D BACA SKALA PASIR (C-A)

E NILAI SETARA PASIR (D/B)X 100

Nama : HENDRIK HENRANTO Nama : MASDAR, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
1" - 3/4" 27.93 100 95.69 4.31 4.31 1.204
1 1/2" - 1" 62.88 100 95.76 4.24 4.24 2.666
2 1/2" - 1 1/2" 100 96.43 3.57 3.57 0.000
TOTAL 100 4.114

SOUNDNESS
SNI 03 - 3407 - 1990
TANGGAL :
MATERIAL : SPLIT (2 - 3 )

% BERAT BERAT KEHILANGAN % %


NO
GRADASI PRAKSI FRAKSI BERAT BERAT BERAT RATA-RATA
DARI SEBELUM SESUDAH DARI TIAP-TIAP DARI BAGIAN / DIKOREKSI OLEH
SARINGAN
SAMPLE TEST TEST FRAKSI YANG HILANG % YANG HILANG
Lolos No.4
3/8" - No. 4
1/2" - 3/8"
3/4" - 1/2" 9.19 673.9 636.80 37.10 5.51 0.506
1" - 3/4" 27.93 500.2 484.50 15.70 3.14 0.877
1 1/2" - 1" 62.88 1000.3 987.60 12.70 1.27 0.798
2 1/2" - 1 1/2" 0.00 #DIV/0! #DIV/0!
0.00 #DIV/0! #DIV/0!
TOTAL 100.00 2.181
KEPIPIHAN DAN KELONJONGAN
RSNI T 01 - 2005
Material : SPLIT 1-2 Tanggal :

Berat contoh uji (wt) : 2800.1 gram


Ukuran Gradasi % tertahan Berat tertahan Berat tertahan setelah Butiran yang pipih (fi) Butiran yang lonjong (ei) pipih dan lonjong (NfNei)

Saringan Agregat (pi) (wi) gram pengurangan ≥ 10% Rasio 1 : 5 Rasio 1 : 5 Rasio 1 : 5
gram1) gramr1) % gram1) % gram1) %

a b c d=c*wt/pt e f g=f/e*100 h i=h/e*100 j k=j/e*100


1,5" 100

1" 96 4 123 123.2 7.0 5.68

3/4 " 37.56 58.24 1710.8 2286.3 63.7 2.79

1/2 " 7.77 29.79 875.1 1896.2 56.9 3.00

3/8 " 0.48 7.29 214.2 683.8 22 3.2 12 1.8 24.6 3.60

Total % tertahan (pt = p1+p2+p3+…) = 95.3 % Rata 2 (%) = Rata 2 (%) = Rata 2 (%) = 3.128

PERSYARATAN UMUM

NILAI MAKS. : 10 %
PIPIH DAN LONJONG
RSNI T 01 - 2005
Material : SPLIT 2 - 3 Tanggal :

Berat contoh uji (wt) : 3200 gram


Ukuran Gradasi % tertahan Berat tertahan Berat tertahan setelah Butiran yang pipih (fi) Butiran yang lonjong (ei) pipih dan lonjong (NfNei)

Saringan Agregat (pi) (wi) gram pengurangan ≥ 10% Rasio 1 : 5 Rasio 1 : 5 Rasio 1 : 5
gram1) gramr1) % gram1) % gram1) %

a b c d=c*wt/pt e f g=f/e*100 h i=h/e*100 j k=j/e*100


1,5" 100

1" 68.15 31.85 1312.8 1075.6 41.6 3.87

3/4 " 22.36 45.79 1887.2 278.1 9.5 3.42

1/2 "

3/8 " 22 #DIV/0! 12 #DIV/0!

Total % tertahan (pt = p1+p2+p3+…) = 77.6 % Rata 2 (%) = Rata 2 (%) = Rata 2 (%) = 3.642

PERSYARATAN UMUM

NILAI MAKS. : 10 %
ANGULARITAS HALUS
SNI 03 - 6877 - 2002
Material : Pasir Tanggal :

PERCOBAAN
NO URAIAN
I II

1. Volume Silinder (v) 100.9 100.9

Berat contoh yang telah dicuci dan


2. (W) 129.8 129.0
dikeringkan

3. Berat jenis bulk ( Gsb ) 2.590 2.590

Volume contoh dengan menggunakan ( W/Gsb )


4. 50.1 49.8
berat jenis bulk
V  W 
Kadar rongga sebagai angularitas  Gsb   100 %
5.   50.33 50.64
agregat halus 
V

Hasil rata-rata 50.48

Keterangan
Kode Pengujian : Jenis Contoh : Asbuton 15/25
Paket ### Terima Tgl. :
Kontraktor ### Description : Kadar Air
Metode Uji :

KADAR AIR AGREGAT

MATERIAL : ASBUTON 15/25 TANGGAL :

KADAR AIR SAMPEL I SAMPEL II

G NOMOR TIN BOX 1 2

H BERAT TIN BOX 14.1 13.2

I B.TIN BOX+T.BASAH 60.2 67

J B.TIN BOX+T.KERING 59.7 66.5

K BERAT TANAH KERING 45.6 53.3

L BERAT AIR = I-J 0.5 0.5

M KADAR AIR= L/K X 100% 1.10 0.94

RATA-RATA 1.02

Nama : Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
0 : Jenis Contoh : TANAH
Paket 0 Terima Tgl. 0
Kontraktor 0 Metode Uji : SNI 03-4804-1998

BERAT ISI AGREGAT

MATERIAL : TANAH TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr
B BERAT CONTAINER+AGREGAT gr
C BERAT AGREGAT = B-A gr
D VOLUME CONTAINER cm³
E BERAT ISI AGREGAT = C/D gr/cm³
F BERAT ISI RATA-RATA AGREGAT gr/cm³
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr
B BERAT CONTAINER+AGREGAT gr
C BERAT AGREGAT = B-A gr
D VOLUME CONTAINER cm³
E BERAT ISI AGREGAT = C/D gr/cm³
F BERAT ISI RATA-RATA AGREGAT gr/cm³

BERAT ISI AGREGAT

MATERIAL : 2-3 TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11056 11105
C BERAT AGREGAT = B-A gr 4236 4285
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11169 11172
C BERAT AGREGAT = B-A gr 4349 4352
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!

Nama : HENDRIK HENDRANTO Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :


Err:509
0 : Jenis Contoh : 1-2 , 0,5-1
Paket 0 Terima Tgl. 0
Kontraktor 0 Metode Uji : SNI 03-4804-1998

BERAT ISI AGREGAT

MATERIAL : 1-2, TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11180 11112
C BERAT AGREGAT = B-A gr 4360 4292
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11251 11201
C BERAT AGREGAT = B-A gr 4431 4381
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!

BERAT ISI AGREGAT

MATERIAL : 0,5-1 TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11250 11297
C BERAT AGREGAT = B-A gr 4430 4477
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6720
B BERAT CONTAINER+AGREGAT gr 11397 11360
C BERAT AGREGAT = B-A gr 4577 4640
D VOLUME CONTAINER cm³ 0 0
E BERAT ISI AGREGAT = C/D gr/cm³ #DIV/0! #DIV/0!
F BERAT ISI RATA-RATA AGREGAT gr/cm³ #DIV/0!

Nama : HENDRIK HENDRANTO Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
0 : Jenis Contoh : Abu Batu, Pasir
Paket 0 Terima Tgl. 0
Kontraktor 0 Metode Uji : SNI 03-4804-1998

BERAT ISI AGREGAT

MATERIAL : ABU BATU TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11122 11101
C BERAT AGREGAT = B-A gr 4302 4281
D VOLUME CONTAINER cm³ 3219 3219
E BERAT ISI AGREGAT = C/D gr/cm³ 1.34 1.33
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.33
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11222 11191
C BERAT AGREGAT = B-A gr 4402 4371
D VOLUME CONTAINER cm³ 3219 3219
E BERAT ISI AGREGAT = C/D gr/cm³ 1.37 1.36
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.36

BERAT ISI AGREGAT

MATERIAL : PASIR TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11020 11026
C BERAT AGREGAT = B-A gr 4200 4206
D VOLUME CONTAINER cm³ 3219 3219
E BERAT ISI AGREGAT = C/D gr/cm³ 1.30 1.31
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.31
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6820 6820
B BERAT CONTAINER+AGREGAT gr 11110 11111
C BERAT AGREGAT = B-A gr 4290 4291
D VOLUME CONTAINER cm³ 3219 3219
E BERAT ISI AGREGAT = C/D gr/cm³ 1.33 1.33
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.33

Nama : HENDRIK HENDRANTO Nama : Masdar, ST

Di Uji Mulai Tgl. : Di Periksa Tanggal :

Selesai Tgl. : Paraf :

Err:509
BERAT ISI AGREGAT
SNI 03 - 4804 - 1998

MATERIAL : Pasir (Tombolo - Pangkep ) TANGGAL :

LEPAS
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11299.4 11282.6
C BERAT AGREGAT = B-A gr 4494.4 4477.6
D VOLUME CONTAINER cm³ 3258.19 3258.19
E BERAT ISI AGREGAT = C/D gr/cm³ 1.379 1.374
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.377
PADAT :
NO BENDA UJI I II III
A BERAT CONTAINER gr 6805 6805
B BERAT CONTAINER+AGREGAT gr 11399.7 11416.7
C BERAT AGREGAT = B-A gr 4594.7 4611.7
D VOLUME CONTAINER cm³ 3258.19 3258.19
E BERAT ISI AGREGAT = C/D gr/cm³ 1.410 1.415
F BERAT ISI RATA-RATA AGREGAT gr/cm³ 1.413
ANALISA SARINGAN
SNI 03 - 1968 - 1990
MATERIAL : Pasir TANGGAL :

CONTOH I = 1000 Gram CONTOH II = 1000.9 Gram


NO RATA-RATA
BERAT KUMILATIF BERAT KUMILATIF
TERTAHAN BERAT % % % LEWAT TERTAHAN BERAT % %
SARINGAN
MASING2 TERTAHAN TERTAHAN LEWAT MASING2 TERTAHANTERTAHAN LEWAT

2" 0 0 0 100 100 0 0 0 100


11/2" 0 0 0 100 100 0 0 0 100
1" 0 0 0 100 100 0 0 0 100
3/4" 0 0 0 100 100 0 0 0 100
1/2" 0 0 0 100 100 0 0 0 100
3/8" 0 0 0 100 100 0 0 0 100
No. 4 16.8 16.8 1.68 98.32 98.10 21.2 21.2 2.12 97.88
No. 8 235.7 252.5 25.25 74.75 74.32 240.1 261.3 26.11 73.89
No.10 63.9 316.4 31.64 68.36 68.00 62.5 323.8 32.35 67.65
No. 16 197.7 514.1 51.41 48.59 49.00 182.5 506.3 50.58 49.42
No. 30 217.4 731.5 73.15 26.85 26.80 226.9 733.2 73.25 26.75
No.40 89.1 820.6 82.06 17.94 17.84 90.1 823.3 82.26 17.74
No. 50 74.3 894.9 89.49 10.51 11.67 49.2 872.5 87.17 12.83
No. 100 67.8 962.7 96.27 3.73 3.89 87.9 960.4 95.95 4.05
No. 200 12.9 975.6 97.56 2.44 2.43 16.2 976.6 97.57 2.43
Pan 24.4 1000.0 100.00 0.00 0.00 24.3 1000.9 100.00 0.00
KADAR ORGANIK
SNI 03 -2816 - 1992

MATERIAL : PASIR TANGGAL :

HASIL PENGAMATAN KETERANGAN


I II Catatan :
Penggunaan Material Pasir
sebelum digunakan harus di cuci terlebih
dahulu

1 1

2 2

3 √ 3 √

4 4

5 5
5 5
MATERIAL LOLOS SARINGAN No. 200
SNI - 03 - 4142 - 1996

Lokasi :
Material : Pasir ( Tombolo - Pangkep ) Tanggal :

1 SAMPLE NO. 1 2
2 Berat wadah + Sample Sebelum dicuci A
3 Berat wadah + Setelah dicuci B
4 Berat wadah C
5 Berat Sample Sebelum dicuci A-C 0 0
6 Berat Sample Setelah dicuci B-C 0 0
7 Kadar Lempung % #DIV/0! #DIV/0!
8 Rata-Rata % #DIV/0!
MATERIAL LOLOS SARINGAN No. 200
SNI - 03 - 4142 - 1996

Lokasi :
Material : Split 1 - 2 Tanggal :

1 SAMPLE NO. 1 2
2 Berat wadah + Sample Sebelum dicuci A
3 Berat wadah + Setelah dicuci B
4 Berat wadah C
5 Berat Sample Sebelum dicuci A-C 0 0
6 Berat Sample Setelah dicuci B-C 0 0
7 Kadar Lempung % #DIV/0! #DIV/0!
8 Rata-Rata % #DIV/0!
MATERIAL LOLOS SARINGAN No. 200
SNI - 03 - 4142 - 1996

Lokasi :
Material : Split 2 - 3 Tanggal

1 SAMPLE NO. 1
2 Berat wadah + Sample Sebelum dicuci A
3 Berat wadah + Setelah dicuci B
4 Berat wadah C
5 Berat Sample Sebelum dicuci A-C 0
6 Berat Sample Setelah dicuci B-C 0
7 Kadar Lempung % #DIV/0!
8 Rata-Rata % #DIV/0!
:

0
0
#DIV/0!
#DIV/0!
TRIAL MIX
LAPIS PONDASI AGREGAT KELAS 'A'

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs.


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE )
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO
KONSULTAN : PT. SEECON'S - INDEC Jo.
TANGGAL : 1 DESEMBER 2017

BERAT ISI PROPORSI VOLUME BUCKET JUMLAH BUCKET (MIX 50 m3 )


( DMF ) CAMPURAN EXCAVATOR WILL LOADER
JENIS MATERIAL
EXCAVATOR WILL LOADER
(gr/cmᶟ ) (%) (mᶟ) (mᶟ)
BUCKET BUCKET

SPLIT 2- 3 1.343 30 0.8 3.2 14.0 3.5

SPLIT 1 -2 1.329 20 0.8 3.2 9.4 2.4

SPLIT 0.5 - 1 1.325 15 0.8 3.2 7.1 1.8

PASIR 1.324 25 0.8 3.2 11.8 3.0

ABU - BATU 1.321 10 0.8 3.2 4.7 1.2

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
QUALITY CONTROL
LAPIS PONDASI AGREGAT KELAS A
PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs.
( PENGASPALAN OPRID JEMBATAN S.AWOTARAE )
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO
KONSULTAN : PT. SEECON'S - INDEC Jo.
PEKERJAAN : LAPIS PONDASI AGREGAT KELAS A
TANGGAL : 2 DESEMBER 2017

Berat Contoh 1 : 5155.6 Berat Contoh 2 : 5100.4 Spesifikasi


Ukuran
Komulatif Komulatif Rata- Rata
Saringan Saringan
Lolos
No. Min Maks.
Berat % Berat Tertahan % Tertahan % (%)
(mm) % Tertahan
Tertahan Lewat Lewat
2 in 50.00 0 0 100.00 0 0 100.00 100.00 100 100
1 1/2 in 37.50 0 0 100.00 0 0 100.00 100.00 100 100
1' 25.00 804.3 15.60 84.40 825.6 16.19 83.81 84.11 79 85
3/8 in 9.50 2372.7 46.02 53.98 2398.5 47.03 52.97 53.48 44 58
No. 4 4.750 2999.5 58.18 41.82 3008.9 58.99 41.01 41.41 29 44
No. 10 2.000 3740.2 72.55 27.45 3690.4 72.36 27.64 27.55 17 30
No. 40 0.425 4420.3 85.74 14.26 4395.0 86.17 13.83 14.05 7 17
No. 200 0.075 4885.9 94.77 5.23 4799.9 94.11 5.89 5.56 2 8

GRAFIK COMBINED GRADASI

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
PENGUJIAN KEPADATAN LAPANGAN
METODE SAND CONE TEST
SNI 03 - 2828 - 1992

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs.


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE )
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO
KONSULTAN : PT. SEECON'S - INDEC Jo.
PEKERJAAN : LAPIS PONDASI AGREGAT KELAS A
TANGGAL : 2 DESEMBER 2017

No. PASSING 8 10 12
1 POSISI L//R L CL R
2 KEDALAMAN LUBANG cm 14 14 14
PENENTUAN ISI LUBANG
3 BERAT PASIR + BOTOL + CORONG gr 7827 7790 7735
4 BERAT SISA PASIR + BOTOL + CORONG gr 3540 3665 3705
5 BERAT PASIR TERPAKAI gr 3-4 4287 4125 4030
6 BERAT PASIR DALAM CORONG = ( Kalibrasi LAB ) gr 1711 1711 1711
7 BERAT PASIR DALAM BOTOL gr 5-6 2576 2414 2319
8 BERAT ISI PASIR = ( Kalibrasi LAB ) gr/cm3 1.540 1.540 1.540
9 VOLUME LUBANG cm3 7:8 1672.7 1567.5 1505.8
PENETUAN KADAR AIR
10 BERAT TANAH BASAH + TEMPAT gr 465 460 400
11 BERAT TANAH KERING + TEMPAT gr 454 449 392
12 BERAT TEMPAT gr 192 192 195
13 BERAT AIR gr 10 - 11 11.0 11.0 8.0
14 BERAT TANAH KERING gr 11 - 12 262 257 197
15 KADAR AIR % 13 : 14 x 100 4.20 4.28 4.06
PENENTUAN KEPADATAN
16 BERAT MATERIAL DALAM LUBANG gr 3839 3660 3550
17 BERAT MATERIAL TERTAHAN 3/4" gr 760 895 1003
18 BERAT MATERIAL LOLOS 3/4" gr 16 - 17 3079 2765 2547
19 % MATERIAL TERTAHAN 3/4" gr 17 : 16 x 100 19.80 24.45 28.25
20 % MATERIAL LOLOS 3/4" gr 18 : 16 x 100 80.20 75.55 71.75
21 BERAT JENIS GABUNGAN ( Sp. Gr ) % 2.662 2.662 2.662
22 BERAT ISI BASAH % 16 : 9 2.295 2.335 2.357
23 BERAT ISI KERING gr/cm3 22/(15+100)*100) 2.203 2.239 2.265
24 Y ͩLAB gr/cm3 2.135 2.135 2.135
25 GABUNGAN Sp.Gr Y ͩLAB gr/cc 21 x 24 5.684 5.684 5.684
(25) X 100
26 Y ͩ KOREKSI = gr/cm3
{(19) x (24)} + {(20)} x (21)} 2.222 2.244 2.262
27 % DERAJAT KEPADATAN % 23 : 26 x 100 99.12 99.79 100.17
SKET LOKASI TEST :

Disetujui Oleh, Diperiksa Oleh, Dibuat dan dites oleh,


PPK 15 JEMBATAN KONSULTAN SUPERVISI KONTRAKTOR PELAKSANA
WILAYAH II SULAWESI SELATAN PT. SEECONS - INDEC Jo. PT. RAJASA TOMAX GLOBALINDO

ABDUL RAJAB BASIR, ST FAISAL MAKMUR, ST DEDI SETIADI,ST


KOORDINATOR LAPANGAN QUALITY ENGINEER QUALITY CONTROL
PENGUJIAN KEPADATAN TANAH
METODE SAND CONE
SNI 03 - 2828 - 1992

PROYEK : PENGGANTIAN JEMBATAN S.SALOBARANI,Cs.


( PENGASPALAN OPRID JEMBATAN S.AWOTARAE )
KONTRAKTOR : PT. RAJASA TOMAX GLOBALINDO
KONSULTAN : PT. SEECON'S - INDEC Jo.
TANGGAL : 2 DESEMBER 2017

PASSING 10 12 14 Spesifikasi
a. Berat contoh tanah basah dari lubang (gram) 3760.0 3864.0 3850.0
b. Berat pasir+gelas+corong (gram) 7970.0 7913.0 7913.0
c. Berat sisa pasir+gelas+corong (gram) 4008.0 4025.0 4025.0
d. Berat pasir didalam corong+Lubang (b - c) (gram) 3962.0 3888.0 3888.0
e. Berat pasir didalam corong 1626.7 1626.7 1626.7
f. Berat pasir di dalam lubang (d - e) (gram) 2335.3 2261.3 2261.3
g. Berat isi pasir (gram/cm³) 1.569 1.569 1.569
h. Volume pasir dalam lubang (f / g) (cm³) 1488.40 1441.24 1441.24
i. Berat Material tertahan 3/4' w
j. Berat Material lolos 3/4' w.1= a-w (gram)
k. % Material tertahan w.2 = a/wx 100 ( % )
l. % Material lolos w.3 = w.1/w x 100 ( % )
m. Berat Jenis Bulk bj (gr/cc)
n. Berat isi tanah basah (a / h) gram/cm³) 2.526 2.681 2.671
o. Kadar air ka. (%) 16.00 16.30 16.30
p. Berat isi kering Lap. (100 x i) / ( j + 100) (gram/cm³) 2.178 2.305 2.297
q. Berat isi kering lab (gram/cm³) 2.135 2.135 2.135
r. Hasil Koreksi (%) 27.0 27.0 27.0
s. Berat isi kering Koreksi
t. Derajat kepadatan dilapangan (k / l x 100) (%) 102.0 108.0 107.6

Kadar air
a.Berat cawan (gram)
b. Berat tanah basah+cawan (gram)
c. Berat tanah kering+cawan (gram) SPEEDY TEST
d. Berat air (c - d) (gram)
e. Berat tanah kering (d - b) (gram)
f. Kadar air (100 x e / f) (%) 16.00 16.30 16.30

Keterangan :

Disetujui oleh Diperiksa Oleh Dikerjakan oleh


PPK PERKERETAAPIAN KONSULTAN KONTRAKTOR
PROV.SUL-SEL PT.DARDELA - YODYA - AMHYTAS KSO PT. HUTAMA KARYA - PT. BUMI KARSA KSO

Pengawas Lapangan Inspector Quality Control