Tebal Berat (Gram) Volume Density ( Cm³ ) Kepadatan ( % )
Core Nomor Lokasi Trial
Hampar Test
Drill Contoh Gembur Padat Udara SSD Dalam Air ( Cm³ ) Trial Lab Trial (%) Spek (%)
A 7.40 6.40 1342 1346.4 747.8 598.6 2.242 2.332 96.14 98.00%
segmen 1
B 7.00 6.00 1201.8 1205.8 669.6 536.2 2.241 2.332 96.11 98.00%
G 10 Passing 7.60 6.50 1072.8 1080.6 608.2 472.4 2.271 2.332 97.38 98.00%
H 8.30 7.10 1250.2 1259.4 705.8 553.6 2.258 2.332 96.84 98.00%
Rata - Rata 7.58 6.50
Los Rata-Rata : 14.19
C 9.40 8.00 1508.8 1515.5 853.4 662.1 2.279 2.332 97.72 98.00%
segmen 2
06 Juni 2018
07 Juni 2018
08 Juni 2018
D 9.90 8.40 1499.2 1509.5 804.3 705.2 2.126 2.332 91.16 98.00%
I 12 Passing 7.30 6.20 1055.2 1066.6 603.8 462.8 2.280 2.332 97.77 98.00%
J 7.20 6.10 967.8 970.0 543.4 426.6 2.269 2.332 97.28 98.00%
Rata - Rata 8.45 7.18
Los Rata-Rata : 15.09
E 7.20 6.00 1096.4 1110.9 635.7 475.2 2.307 2.332 98.94 98.00%
segmen 3
F 7.40 6.20 1038 1059.2 609.2 450 2.307 2.332 98.91 98.00%
K 14 Passing 7.10 5.90 1083.4 1091.2 619.6 471.6 2.297 2.332 98.51 98.00%
L 9.10 7.50 1246.8 1256.8 711.6 545.2 2.287 2.332 98.06 98.00%
Rata - Rata 7.70 6.40
Los Rata-Rata : 16.88 98.61
Bina Marga Konsultan Supervisi Penyedia Jasa
Project Officer PT. Epadascon Permata PT. Putra Sami Jaya
Pada Kamis, 2 MEI 2019 telah diadakan Trial Compaction Asphal Concrate Wearing Coarse ( AC-WC) untuk Pekerjaan Paket
PRESERVASI JALAN RUAS SUNGAI DURI - BATAS KOTA MEMPAWAH DAN SEI PINYUH PONTIANAK 2019
yang mengacu pada hasil Jobmix Formula ( JMF ), yang telah dilaksanakan secara bersama-sama oleh pihak Kontraktor dengan
di awasi oleh pihak Konsultan Supervisi dan Direksi Pekerja ( PU ) Dengan Hasil Sebagai Berikut ,(Rincian Terlampir)
MARSHALL TEST
PEMADATAN DI LAPANGAN
TANDEM 2 Passing
125 -145 Derajat
99 %' Min.98.0 %
PTR 14 Passing 100 - 125 Derajat
LOSS 18 %
Demikian Berita Acara ini Dibuat, untuk acuan kerja selanjutnya pada Pekerjaan , PRESERVASI JALAN SUI DURI - BATAS KOTA
MEMPAWAH DAN SEI PINYUH - PONTIANAK 2019
KALIMANTAN BARAT
KONSULTAN KONTRAKTOR
PAKET : PRESERVASI JALAN RUAS SEI DURI - BATAS KOTA MEMPAWAH & SEI PINYUH -
PONTIANAK
KONTRAKTOR : PT. TRANS BORNEO LESTARI
KONSULTAN : PT. PLANOSIP NUSANTARA ENGINEERING
03 Mei 2019
04 Mei 2019
C PASSING 16 7.5 6.2 1141.6 1146.2 648.6 497.6 2.294 2.306 99.5 98.00%
D 7.4 6.1 1113.4 1118.2 632.6 485.6 2.293 2.306 99.4 98.00%
Rata - rata 7.4 6.1 2.296 2.306 99.6 98.00%
Loss thickness : 20.0%
A 7.5 6.6 1169.6 1171.2 685.2 486 2.407 2.306 104.4 98.00%
segmen 3
B 8.0 7.1 1306.2 1310.2 750.4 559.8 2.333 2.306 101.2 98.00%
C PASSING 18 7.3 5.8 1061.0 1065.2 604.6 460.6 2.304 2.306 99.9 98.00%
D 7.8 6.3 1155.6 1159.4 662.6 496.8 2.326 2.306 100.9 98.00%
Rata - rata 7.7 6.5 2.342 2.306 101.6 98.00%
Loss thickness : 22.0%
Tanggal : 2-May-2109
1 5.40 1199.2 1205.8 686.2 519.6 2.308 30 918 918 3.1 296
2 1196.8 1201.8 683.0 518.8 2.307 32 979 979 3.0 326
3 1197.8 1203.6 685.4 518.2 2.311 31 949 949 3.4 279
4 1198.8 1204.0 683.6 520.4 2.304 33 1010 1010 3.2 316
5 1194.4 1210.2 692.2 518.0 2.306 31 949 949 3.3 287
6 1199.2 1204.2 683.4 520.9 2.302 30 918 918 3.2 287
2.306 2.404 17.72 4.06 77.08 31 954 954 3.2 299 5.05 1.0
Min. 15 3-5 Min. 65 Min.800 2-4 Min. 250 0.6 - 1.2
N0 Keterangan 1 2
Tanggal : 2-May-2109
Effective
Gs Bulk of Marshall Retained
Weight (Gram) Vol of Mix Gmm Stability Flow Asphalt
Bitument Content (%) Mix VMA (%) VIM (%) VFB (%) Quotient Marshall
(Cm3) maxs (mm) Content
In Air SSD In Water (gr/cm3) Read Load Kg (kg/mm) Stab (%)
No. (%)
a b c d e f g h i j k l m n o p q s
100-((100- 100- b-(Pba(100-
By Wt of Agg By Wt of Mix From Lab From Lab From Lab d-e c/f 100x(i-j)/i From Lab l x Cal Adjust From Lab n/o
b)xg)/Gsb (100xg/h) b))/100
1 5.40 1199.4 1205.4 687.4 518.0 2.315 2.404 17.40 3.68 78.83 30 918 918 3.1 296.1
2 1199.2 1204.2 685.2 519.0 2.311 2.404 17.57 3.88 77.89 30 918 918 3 306.0
2.313 2.404 17.49 3.78 78.36 918 3.1 301 5.40 96.3
MIN. 90
Tanggal : 2-May-2109
MIN. 2
STREEP MAP
1 3 5 7
14 PASSING 16 PASSING
2 4 6 8
ARAH PINYUH 9 11 ARAH PONTIANAK
18 PASSING
10 12
Bina Marga Konsultan Supervisi Penyedia Jasa
Project Officer PT. Planosip Nusantara Engineering PT. Trans Borneo Lestari