Anda di halaman 1dari 264

1 Satu Err:509 Err:509

2 Dua Err:509 Ratus Err:509


3 Tiga Err:509 Err:509 Err:509
4 Empat Err:509 Err:509 Err:509
5 Lima
6 Enam

7 Tujuh 11 10
8 Delapan e f g
9 Sembilan
0 0
1 Se 1 Nilai : Err:509
1 Satu Hasil: Err:509
Err:509
Err:509 Err:509 Milyar Err:509 Ratus Err:509 Err:509 Err:509 Juta Err:509
0 Err:509 0 Err:509 Err:509 Err:509 0 Err:509 0 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

9 8 7 6 5
h I j k l m n o p q

Err:509
rr:509

2.88E+09
Err:509 Err:509
Ratus Err:509 Err:509 Err:509 Ribu Err:509 Ratus Err:509 Err:509 Err:509
Err:509 Err:509 0 Err:509 Err:509 Err:509 Err:509 Err:509 0 Err:509
Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509 Err:509

4 3 2 1
r s t u v w x y
Rupiah
Err:509
REKAB TOTAL RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

Kegiatan : Pembanguan Rumah


Pekerjaan : Pembanguan Rumah BU Diana

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp. 500,000.00
II PEKERJAAN TANAH Rp. 49,919.70
III PEKERJAAN BETON Rp. 12,359,475.38

B PEKERJAAN ARSITEKTUR
I PEKERJAAN PASANGAN/PLESTERAN Rp. Err:509
II PEKERJAAN PINTU/JENDELA Rp. 227,009,500.00
III PEKERJAAN LANTAI DAN PELAPIS DINDING Rp. Err:509
IV PEKERJAAN LANGIT - LANGIT Rp. 200,270,252.50
V PEKERJAAN PENGECATAN Rp. 142,110,249.80
VI PEKERJAAN FASAD Rp. 144,389,015.20

C PEKERJAAN ELEKTRIKAL
I PEKERJAAN LAMPU DAN STOP KONTAK Rp. 51,637,760.20

D PEKERJAAN INSTALASI PIPA AIR BERSIH


I. PEKERJAAN INSTALASI PIPA AIR BERSIH Rp. 79,981,357.60
II. PEKERJAAN INSTALASI PIPA AIR AIR KOTOR DAN AIR BEKAS Rp. 70,372,313.20
III. PEKERJAAN INSTALASI AIR HUJAN Rp. 9,138,880.00

JUMLAH KESELURUHAN Rp. Err:509


JUMLAH TOTAL Rp. Err:509
DIBULATKAN Rp. Err:509

Terbilang : Err:509

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

Kegiatan : Pembanguan Desa


Pekerjaan : Pembangunan Gapura

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN Rp. 500,000.00
II PEKERJAAN TANAH Rp. 49,919.70
III PEKERJAAN BETON Rp. 12,359,475.38

JUMLAH KESELURUHAN Rp. 12,909,395.08

, 2020
Dibuat Oleh :
Konsultan Perencana
,,,,,,,,,,,,,,,,,

…................
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
Kegiatan : Pembanguan Desa
Pekerjaan : Pembangunan Gapura

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
1 2 3 4 5

A PEKERJAAN STRUKTUR
I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan 1.00 Ls 500,000.00 Rp. 500,000.00

Jumlah Keseluruhan Rp. 500,000.00

B PEKERJAAN TANAH
1 Pek. Galian Tanah Biasa 0.500 m³ 63,130.00 Rp. 31,565.00
2 Pek. Urugan Tanah Kembali 0.130 m³ 21,040.00 Rp. 2,735.20
3 Pek. Urugan Tanah Pilihan Dipadatkan 0.150 m³ 104,130.00 Rp. 15,619.50

Jumlah Keseluruhan Rp. 49,919.70

III PEKERJAAN BETON


1 Pek. Lantai Kerja Tbl. 7 Cm
a. Pek. Beton Mutu f'c = 7,4 MPa (K.100) 0.035 m³ 944,010.00 Rp. 33,040.35
2 Pek. Footplat Uk. 50 x 50 x 30 ( Type FP1 )
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) 0.125 m³ 1,109,930.00 Rp. 138,741.25
b. Pek. Pembesian Dengan Besi Polos 9.235 Kg 11,600.00 Rp. 107,129.48
c. Pek. Pembesian Dengan Besi Ulir 15.903 Kg 12,070.00 Rp. 191,952.83
d. Pek. Begesting Pondasi ( 4X Pakai ) 0.250 m² 163,580.00 Rp. 40,895.00
3 Pek. Beton Kolom Pedestal Uk.20 x 20 ( Type K1 )
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) 0.120 m³ 1,109,930.00 Rp. 133,191.60
b. Pek. Pembesian Dengan Besi Polos 7.007 Kg 11,600.00 Rp. 81,285.84
c. Pek. Pembesian Dengan Besi Ulir 18.754 Kg 12,070.00 Rp. 226,359.57
d. Pek. Begesting Kolom ( 4X Pakai ) 0.600 m² 299,340.00 Rp. 179,604.00
4 Pek. Beton Kolom Uk. 20 x 20 ( Type K1 )
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) 0.672 m³ 1,109,930.00 Rp. 745,872.96
b. Pek. Pembesian Dengan Besi Polos 32.701 Kg 11,600.00 Rp. 379,332.76
c. Pek. Pembesian Dengan Besi Ulir 105.022 Kg 12,070.00 Rp. 1,267,615.54
d. Pek. Begesting Kolom ( 4X Pakai ) 1.680 m² 299,340.00 Rp. 502,891.20
5 Pek. Balok Latai Uk. 15 x 15 ( Type BL ) toc +2,73
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) 0.090 m³ 1,109,930.00 Rp. 99,893.70
b. Pek. Pembesian Dengan Besi Polos 12.980 Kg 11,600.00 Rp. 150,568.00
c. Pek. Begesting Balok ( 4X Pakai ) 0.300 m² 311,370.00 Rp. 93,411.00
6 Pek. Balok Uk. 15 x 20 ( Type B2 ) toc +3.00
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) 0.120 m³ 1,109,930.00 Rp. 133,191.60
b. Pek. Pembesian Dengan Besi Polos 12.980 Kg 11,600.00 Rp. 150,568.00
c. Pek. Begesting Balok ( 4X Pakai ) 0.300 m² 311,370.00 Rp. 93,411.00
7 Pas. Dinding Bata Merah Tebal 1/2 Bata Camp. 1 PC : 6 Ps 8.400 m² 109,480.00 Rp. 919,632.00
8 Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm 16.800 m² 54,180.00 Rp. 910,224.00
9 Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps 8.000 m1 23,870.00 Rp. 190,960.00
10 Pek. Acian 16.800 m² 32,130.00 Rp. 539,784.00

Jumlah Keseluruhan Rp. 7,309,555.68


IV PEKERJAAN GAPURA
1 Pemasangan Gapura Besi Stainless 1.000 ls 3,750,000.00 Rp. 3,750,000.00
2 Pasang Huruf 1.000 ls 750,000.00 Rp. 750,000.00

Jumlah Keseluruhan Rp. 4,500,000.00


Jumlah Total Rp 12,359,475.38

, 2020
Dibuat Oleh :
Konsultan Perencana
,,,,,,,,,,,,,,,,,
…................
0
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

Kegiatan : Pembanguan Desa


Pekerjaan : Pembangunan Gapura

B PEKERJAAN ARSITEKTUR
I PEKERJAAN PASANGAN/PLESTERAN Rp. Err:509
II PEKERJAAN PINTU/JENDELA Rp. 227,009,500.00
III PEKERJAAN LANTAI DAN PELAPIS DINDING Rp. Err:509
IV PEKERJAAN LANGIT - LANGIT Rp. 200,270,252.50
V PEKERJAAN PENGECATAN Rp. 142,110,249.80
VI PEKERJAAN FASAD Rp. 144,389,015.20

JUMLAH KESELURUHAN Rp. Err:509

, 2020
Dibuat Oleh :
Konsultan Perencana
,,,,,,,,,,,,,,,,,

…................
0
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
Kegiatan : Pembanguan Desa
Pekerjaan : Pembangunan Gapura

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
1 2 3 4 5

B PEKERJAAN ARSITEKTUR
I PEKERJAAN PASANGAN/PLESTERAN
a. Pekerjaan Pasangan Lantai 1
1 Pas. Pondasi Batu Belah Camp. 1 PC : 5 Ps Err:509 m³ 732,020.00 Rp. Err:509
2 Pasang Batu Kosongan ( Aanstampeng ) Err:509 m³ 362,540.00 Rp. Err:509
3 Pas. Pondasi Rollag Bata Merah Camp. 1 PC : 3 Ps 11.650 m³ 966,790.00 Rp. 11,263,103.50
4 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 (4.500) m² 116,330.00 Rp. (523,485.00)
5 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 463.850 m² 109,480.00 Rp. 50,782,298.00
6 Pek. Plesteran Camp. 1 PC : 3 Ps Tbl. 15 mm 93.940 m² 58,230.00 Rp. 5,470,126.20
7 Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm 544.410 m² 54,180.00 Rp. 29,496,133.80
8 Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps 285.310 m¹ 23,870.00 Rp. 6,810,349.70
9 Pek. Acian 638.350 m¹ 32,130.00 Rp. 20,510,185.50

b. Pekerjaan Pasangan Lantai 2


1 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 39.300 m² 116,330.00 Rp. 4,571,769.00
2 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 363.510 m² 109,480.00 Rp. 39,797,074.80
3 Pek. Plesteran Camp. 1 PC : 3 Ps Tbl. 15 mm 78.600 m² 58,230.00 Rp. 4,576,878.00
4 Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm 727.020 m² 54,180.00 Rp. 39,389,943.60
5 Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps 285.310 m¹ 23,870.00 Rp. 6,810,349.70
6 Pek. Acian 1,012.330 m¹ 32,130.00 Rp. 32,526,162.90

Jumlah Total Rp Err:509

II PEKERJAAN PINTU/JENDELA
a. Pekerjaan Jendela Lantai 1
1 Pasang Pintu Type 1 (PU) 1.00 Unit 3,627,690.00 Rp. 3,627,690.00
2 Pasang Pintu Type 1 ( P1 ) 6.00 Unit 3,692,970.00 Rp. 22,157,820.00
3 Pasang Pintu Type 2 ( P2 ) 7.00 Unit 3,523,760.00 Rp. 24,666,320.00
4 Pasang Pintu TypePS( PS1 ) 1.00 Unit 9,743,430.00 Rp. 9,743,430.00
5 Pasang Jendela Type 1 ( J1 ) 2.00 Unit 4,062,210.00 Rp. 8,124,420.00
6 Pasang Jendela Type 2 ( J2 ) 1.00 Unit 14,581,690.00 Rp. 14,581,690.00
7 Pasang Jendela Type 3 ( J3 ) 1.00 Unit 3,449,610.00 Rp. 3,449,610.00
8 Pasang Jendela Type 4 ( J4 ) 1.00 Unit 2,780,900.00 Rp. 2,780,900.00
9 Pasang Jendela Type bv1 ( BV1 ) 4.00 Unit 1,013,730.00 Rp. 4,054,920.00
10 Pasang Jendela Type bv2 ( BV2 ) 1.00 Unit 1,309,180.00 Rp. 1,309,180.00

b. Pekerjaan Jendela Lantai 2


1 Pasang Pintu Type 1 ( P1 ) 4.00 Unit 3,692,970.00 Rp. 14,771,880.00
2 Pasang Pintu Type 2 ( P2 ) 3.00 Unit 3,523,760.00 Rp. 10,571,280.00
3 Pasang Pintu TypePS( PS2 ) 2.00 Unit 10,336,640.00 Rp. 20,673,280.00
4 Pasang Jendela Type 2 ( J2 ) 1.00 Unit 14,581,690.00 Rp. 14,581,690.00
5 Pasang Jendela Type5 ( J5 ) 1.00 Unit 2,639,910.00 Rp. 2,639,910.00
6 Pasang Jendela Type bv2 ( BV2 ) 1.00 Unit 1,309,180.00 Rp. 1,309,180.00
7 Pasang Skyligt Depan 1.00 Unit 33,226,690.00 Rp. 33,226,690.00
8 Pasang Skyligt Tengah 1.00 Unit 6,739,610.00 Rp. 6,739,610.00
9 Railing Balkon Tempered Glass 16.00 m1 1,750,000.00 Rp. 28,000,000.00

Jumlah Total Rp 227,009,500.00


III PEKERJAAN LANTAI DAN PELAPIS DINDING
a. Pekerjaan Lantai dan Pelapis Dinding Lantai 1
1 Pek. Rabatan Bawah Lantai Tbl. 10 Cm
a. Pek. Beton Mutu f'c = 9,8 MPa (K.125) Err:509 m³ 983,010.00 Rp. Err:509
b. Pek. Pembesian dengan Besi Wiremess M6 Err:509 Kg 10,880.00 Rp. Err:509
2 Pek. Rabatan Jalan Setapak Taman Tbl. 10 Cm
a. Pek. Beton Mutu f'c = 9,8 MPa (K.125) 0.71 m³ 1,126,670.00 Rp. 799,935.70
b. Pek. Pembesian dengan Besi Wiremess M6 31.27 Kg 299,340.00 Rp. 9,360,361.80
3 Pas. Lantai Keramik 60x60 112.91 m² 210,100.00 Rp. 23,722,391.00
4 Pas.Keramik 20x20 30.95 m² 184,390.00 Rp. 5,706,870.50
5 Pas.Keramik 30x30 57.33 m² 202,320.00 Rp. 11,599,005.60
6 Pas.Wood Composit panel 36.98 m² 192,690.00 Rp. 7,125,676.20
7 Pas.Batu Coral Sikat 15.31 m² 166,660.00 Rp. 2,551,564.60
8 Tanam Rumput Gajah Mini 282.41 m² 27,130.00 Rp. 7,661,783.30
9 Pas.Mozaik 10x10 cm 75.22 m² 192,700.00 Rp. 14,494,894.00
10 Pas.Keramik 50x50 45.00 m² 195,100.00 Rp. 8,779,500.00
11 Pas. Keramik Dinding Uk. 30 x 60 98.19 m² 244,350.00 Rp. 23,992,726.50
12 Pas. Lantai Parquet Kayu jati 16.98 m² 58,300.00 Rp. 989,934.00

b. Pekerjaan Lantai dan Pelapis Dinding Lantai 2


1 Pas. Lantai Parquet Kayu jati 40.50 m² 343,060.00 Rp. 13,893,930.00
2 Pas. Lantai Keramik 60x60 26.96 m² 210,100.00 Rp. 5,664,296.00
3 Pas.Keramik 30x30 13.01 m² 202,320.00 Rp. 2,632,183.20
4 Pas.Keramik 50x50 10.80 m² 56,900.00 Rp. 614,520.00

Jumlah Total Rp Err:509


IV PEKERJAAN LANGIT - LANGIT
a. Pekerjaan Langit-Langit Lantai 1
1 Pas. Rangka Plafond Hollow Zincromate 250.37 m² 89,880.00 Rp. 22,503,255.60
2 Pas. Plafond Gypsum Board Tbl 9 mm 212.90 m² 37,170.00 Rp. 7,913,493.00
3 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm 37.47 m² 331,370.00 Rp. 12,416,433.90

b. Pekerjaan Langit-Langit Lantai 2


1 Pas. Rangka Plafond Hollow Zincromate 859.82 m² 89,880.00 Rp. 77,280,621.60
2 Pas. Plafond Gypsum Board Tbl 9 mm 763.15 m² 37,170.00 Rp. 28,366,285.50

c. Pekerjaan Langit-Langit Lantai Atap


1 Pas. Rangka Plafond Hollow Zincromate 46.90 m² 89,880.00 Rp. 4,215,372.00
2 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm 46.90 m² 331,370.00 Rp. 15,541,253.00

Jumlah Total Rp 200,270,252.50

V PEKERJAAN PENGECATAN
a. Pekerjaan Pengecatan Lantai 1
1 Pek. Plamir Dinding 638.35 m² 7,200.00 Rp. 4,596,120.00
2 Pek. Pengecatan Dasar Dengan Alkali Shealer 638.35 m² 20,980.00 Rp. 13,392,583.00
3 Pek. Pengecatan Dinding Emultion 2 Lapis Dengan Roll 638.35 m² 17,030.00 Rp. 10,871,100.50
4 Pek. Pengecatan Dinding Watersheald 2 Lapis Dengan Roll 638.35 m² 38,180.00 Rp. 24,372,203.00
5 Pek. Pengecatan Langit - Langit 212.90 m² 22,230.00 Rp. 4,732,767.00

b. Pekerjaan Pengecatan Lantai 2


1 Pek. Plamir Dinding 805.62 m² 7,200.00 Rp. 5,800,464.00
2 Pek. Pengecatan Dasar Dengan Alkali Shealer 805.62 m² 20,980.00 Rp. 16,901,907.60
3 Pek. Pengecatan Dinding Emultion 2 Lapis Dengan Roll 805.62 m² 17,030.00 Rp. 13,719,708.60
4 Pek. Pengecatan Dinding Watersheald 2 Lapis Dengan Roll 805.62 m² 38,180.00 Rp. 30,758,571.60
5 Pek. Pengecatan Langit - Langit 763.15 m² 22,230.00 Rp. 16,964,824.50

Jumlah Total (a) Rp 142,110,249.80

VI PEKERJAAN FASAD
1 Pas.batu Lempeng 9.29 m² 225,000.00 Rp. 2,090,250.00
2 Pas. Batu Andesit Susun Sirih 151.33 m² 250,360.00 Rp. 37,886,978.80
3 Pas. Papan Coonwood 22.56 m² 192,690.00 Rp. 4,347,086.40
4 Pas.Batu Palimanan 263.75 m² 270,160.00 Rp. 71,254,700.00
5 Pas.roster Beton 4.68 m² 125,000.00 Rp. 585,000.00
6 Gazebo+Acc 1.00 Unit 25,000,000.00 Rp. 25,000,000.00
7 Kisi-Kisi Kayu fin HPL 4.30 m² 750,000.00 Rp. 3,225,000.00

Jumlah Total Rp. 144,389,015.20

, 2020
Dibuat Oleh :
Konsultan Perencana
,,,,,,,,,,,,,,,,,

…................
0
REKAPITULASI RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)

Kegiatan : Pembanguan Desa


Pekerjaan : Pembangunan Gapura

C PEKERJAAN ELEKTRIKAL
I PEKERJAAN LAMPU DAN STOP KONTAK Rp. 51,637,760.20

JUMLAH KESELURUHAN Rp. 51,637,760.20

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
0
RENCANA ANGGARAN BIAYA
ENGINEER ESTIMATE (EE)
Kegiatan : Pembanguan Desa
Pekerjaan : Pembangunan Gapura

HARGA SATUAN JUMLAH HARGA


NO. URAIAN PEKERJAAN VOLUME
( Rp ) ( Rp )
1 2 3 4 5

C PEKERJAAN ELEKTRIKAL
I PEKERJAAN LAMPU DAN STOP KONTAK

a Pekerjaan Lampu dan Stop Kontak Lantai 1


1 Pasang Lampu Downlight Washer Led MR 16 10.00 Bh 168,600.00 Rp. 1,686,000.00
2 Pasang Lampu Dinding 12.00 Bh 402,600.00 Rp. 4,831,200.00
3 Pasang Downlight 12 watt Komplit 52.00 Bh 159,600.00 Rp. 8,299,200.00
4 Pasang Indireck led T5 48.55 m1 32,860.00 Rp. 1,595,353.00
5 Pasang Lampu Cover Black 6.00 Bh 159,600.00 Rp. 957,600.00
6 Pasang Saklar Tunggal 7.00 Bh 29,820.00 Rp. 208,740.00
7 Pasang Saklar Ganda 18.00 Bh 33,060.00 Rp. 595,080.00
8 Pasang Stop Kontak 15.00 Bh 31,890.00 Rp. 478,350.00
9 Pek. Instalasi Titik Lampu 74.00 Ttk 157,530.00 Rp. 11,657,220.00
10 Pek. Instalasi Stop Kontak 15.00 Ttk 105,100.00 Rp. 1,576,500.00

b Pekerjaan Lampu dan Stop Kontak Lantai 2


1 Pasang Lampu Downlight Washer Led MR 16 7.00 Bh 168,600.00 Rp. 1,180,200.00
2 Pasang Downlight 12 watt Komplit 45.00 Bh 159,600.00 Rp. 7,182,000.00
3 Pasang Indireck led T5 63.52 m1 32,860.00 Rp. 2,087,267.20
4 Pasang Saklar Tunggal 1.00 Bh 29,820.00 Rp. 29,820.00
5 Pasang Saklar Ganda 12.00 Bh 33,060.00 Rp. 396,720.00
6 Pasang Stop Kontak 5.00 Bh 31,890.00 Rp. 159,450.00
7 Pek. Instalasi Titik Lampu 52.00 Ttk 157,530.00 Rp. 8,191,560.00
8 Pek. Instalasi Stop Kontak 5.00 Ttk 105,100.00 Rp. 525,500.00

Jumlah Total Rp. 51,637,760.20

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
0
REKAPITULASI RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : Pembanguan Desa


Pekerjaan : Pembangunan Gapura

D PEKERJAAN INSTALASI PIPA AIR BERSIH


I. PEKERJAAN INSTALASI PIPA AIR BERSIH Rp. 79,981,357.60
II. PEKERJAAN INSTALASI PIPA AIR AIR KOTOR DAN AIR BEKAS Rp. 70,372,313.20
III. PEKERJAAN INSTALASI AIR HUJAN Rp. 9,138,880.00

JUMLAH KESELURUHAN Rp. 159,492,550.80

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
REKAPITULASI RENCANA ANGGARAN BIAYA
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : Pembanguan Desa


Pekerjaan : Pembangunan Gapura

Satuan Volume Harga Satuan Jumlah Harga


No. Uraian
Rp Rp

I. PEKERJAAN INSTALASI PIPA AIR BERSIH


Lantai 1
1 Pasang Pipa PVC 3/4" Type AW m' 30.00 66,930 2,007,900.00
###
2 Pasang Pipa PVC 1" Type AW m' 145.62 20,990 3,056,563.80
###
3 Pasang Pipa PVC 1 ½" Type AW m' 12.00 32,670 392,040.00
###
4 Pasang Kran Air Biasa Stainless Bh 6.00 83,430 500,580.00
Lantai 2
1 Pasang Pipa PVC 3/4" Type AW m' 18.00 18,900 2,007,900.00
2 Pasang Pipa PVC 1" Type AW m' 45.50 20,990 3,056,563.80
3 Pasang Pipa PVC 1 ½" Type AW m' 12.00 32,670 392,040.00

Instalasi Air Bersih Lantai Atap ###


1 Roof Tank Kap. 1050 liter Unit 1.00 2,750,000 2,750,000.00
###
2 Water Level Control (WLC) ls 1.00 1,750,000 1,750,000.00
###
3 Kabel WLC dari tandon atas ke Panel pompa NYY 4x2,5 mm m 24.00 125,000 3,000,000.00
###
4 Pompa Boster lengkap termasuk base plate, pressure tank Set 1.00 3,750,000 3,750,000.00
###
panel kontrol, header dan aksesories pompa ###
Q = 2 x 150 lpm, H = 30 m, P = 1,4 kw ###
5 Header Pipa Galvanis Ø 4 " m' 2.00 175,000 350,000.00
###
6 Pipa GIP Ø 1,5 " DISTRIBUSI m' 8.00 275,000 2,200,000.00
###
7 Pipa GIP Ø 1 1/2 " (Pipa Wash Out) m' 8.00 125,000 1,000,000.00
###
8 Stop Kran Ø1,5 " bh 2.00 275,000 550,000.00
###
Instalasi Air Bersih Lantai Atap
1 Pompa Kolam+Acc Unit 1.00 12,500,000 12,500,000.00
2 Instalasi Pipa Kolam ls 1.00 17,500,000 17,500,000.00

Lantai 1 ###
1 Pasang Closet Duduk bh 3.00 2,840,550 8,521,650.00
2 Pasang Avur/Floor Drain/Roof Drain bh 5.00 29,430 147,150.00
3 Pasang Shower Mandi/Hand Shower bh 3.00 101,430 304,290.00
4 Pasang Shower Closet /Spray Shower bh 3.00 83,430 250,290.00
5 Pasang Wastafel bh 5.00 709,040 3,545,200.00
6 Pasang Bak Cuci Piring Stainless bh 1.00 345,130 345,130.00
7 Pasang Closet Jongkok bh 1.00 409,800 409,800.00

Lantai 2
1 Pasang Closet Duduk bh 3.00 2,840,550 8,521,650.00
2 Pasang Avur/Floor Drain/Roof Drain bh 21.00 29,430 618,030.00
3 Pasang Shower Mandi/Hand Shower bh 3.00 101,430 304,290.00
4 Pasang Shower Closet /Spray Shower bh 3.00 83,430 250,290.00
5 Pasang Wastafel bh 3.00 709,040
###
Jumlah Total 79,981,357.60
###

II. PEKERJAAN INSTALASI PIPA AIR AIR KOTOR DAN AIR BEKAS ###
Lantai 1 ###
1 Pipa PVC Type AW Ø 3 " m' 83.60 66,930 5,595,348.00
###
2 Pipa PVC Type AW Ø 4 " m' 44.66 91,210 4,073,438.60
###
3 Pipa PVC Type AW Ø 8 " m' 16.00 225,000 3,600,000.00
###
4 Pipa Riser dan Venting PVC Type Aw Ø 4 " m' 12.00 91,210 1,094,520.00
###
5 Pipa Riser dan Venting PVC Type Aw Ø 4 " m' 5.00 91,210 456,050.00
###

Lantai 2
1 Pipa PVC Type AW Ø 3 " m' 55.00 66,930 5,595,348.00
2 Pipa PVC Type AW Ø 4 " m' 18.00 91,210 4,073,438.60
3 Pipa PVC Type AW Ø 8 " m' 16.00 225,000 3,600,000.00
4 Pipa Riser dan Venting PVC Type Aw Ø 4 " m' 12.00 91,210 1,094,520.00
5 Pipa Riser dan Venting PVC Type Aw Ø 4 " m' 5.00 91,210 456,050.00

Pekerjaan Bak Penampung air bekas dan kotor ###


1 Instalasi Pemipaan Ls 1.00 2,500,000 2,500,000.00
###
2 Pipa PVC Type GI dia 4 ". Ex. Wavin (dari pengumpul ke BIofilter) m' 16.00 514,600 8,233,600.00
###
2 Pas Biofilter Kap 1,2 m3 Unit 1.00 12,500,000 12,500,000.00
3 Pas Bak Resapan Unit 1.00 17,500,000 17,500,000.00
###
Jumlah Total 70,372,313.20
###
###
III. PEKERJAAN INSTALASI AIR HUJAN ###
Dag Atap ###
1 Roof Drain Ø 3 " bh 11.00 125,000 1,375,000.00
###
2 Pipa PVC Type AW Ø 3 " m' 116.00 66,930 7,763,880.00
###
###
Jumlah Total 9,138,880.00
###
- 0.876 1.105

Kepala
Volume 1 Volume 2 PEKERJAAN Volume Mandor
Tukang

Analisa Harga Satuan Pekerjaan Persiapan -


1 m1 Pek. Pengukuran dan Pemasangan Bowplank - 0.005 0.010
-
PEKERJAAN TANAH -
1 m3 Pek. Bor Strouss - 0.005
0.500 1 m3 Pek. Galian Tanah 0.500 0.025
1 m3 Pek. Galian Tanah Keras - 0.025
0.130 1 m3 Pek. Urugan Kembali 0.130 0.008
1 m3 Pek. Urugan Pasir - 0.010
0.150 1 m3 Pek. Urugan Tanah Pilihan 0.150 0.025
1 m3 Pek. Urugan Tanah Humus - 0.025
1 m3 Pek. Urugan Sirtu - 0.025
-
PEKERJAAN PASANGAN -
1 m3 Pas. Aanstampeng - 0.039 0.039
1 m3 Pas. Pondasi Batu Kali 1 : 4 - 0.075 0.060
1 m3 Pas. Rollag Bata Merah Camp 1 PC : 3 Ps - 0.030 0.020
1 m2 Pas. Dinding Trasram 1 : 3 - 0.015 0.010
8.400 1 m2 Pas. Dinding Biasa 1 : 5 8.400 0.015 0.010
16.800 1 m2 Pek. Plesteran Trasram 1 : 3 16.800 0.015 0.015
1 m2 Pek. Plesteran Biasa 1 : 5 - 0.015 0.015
8.000 1 m1 Pek. Benangan 8.000 0.004 0.040
16.800 1 m2 Pek. Acian 16.800 0.010 0.010
1 m2 Roster - 0.015 0.010
-
PEKERJAAN BETON -
1.127 1 m3 Pek. Beton Camp. 1 : 2 : 3 1.127 0.080 0.025
0.035 1 m3 Pek. Beton Camp. 1 : 3 : 5 0.035 0.100 0.035
214.583 1 Kg Pek. Pembesian 214.583 0.000 0.001
0.250 1 m2 Pek. Begesting Pondasi 0.250 0.026 0.026
1 m2 Pek. Begesting Sloof - 0.026 0.026
2.280 1 m2 Pekerjaan Begesting Kolom 2.280 0.033 0.033
0.600 1 m2 Pekerjaan Begesting Balok 0.600 0.033 0.033
1 m2 Pekerjaan Begesting Plat - 0.033 0.033
1 m2 Pemasangan Wiremesh - 0.001 0.025
-
PEKERJAAN KUSEN PINTU JENDELA -
Pas. Kusen Kayu Jati Uk. 6/12 - 0.035 2.100
Pas. Kusen Kayu Kamper Uk. 6/12 - 0.035 2.100
Ongkos Pasang Kusen Kayu Lama - 0.035 2.100
Pas. Daun Pintu Panil Jati - 0.050 0.300
Pas. Slimar Pintu / Jendela - 0.040 0.240
Ongkos Pasang Slimar Kayu Lama - 0.040 0.240
Pas. Kaca Bening 5 mm - 0.008 0.016
Onghkos Pasang Kaca Lama - 0.008 0.016
Pas. Papan Jalusi - 0.050 0.300
Pas. Partisi Double Kalsiboard Rangka Metalstud - 0.008 0.045
-
PEKERJAAN KUNCI / PENGANTUNG -
Pas. Kunci Tanam 1X Putar - 0.025
Pas. Kunci Tanam 2X Putar - 0.025
Pas. Engsel Pintu - 0.013
Pas. Engsel Jendela - 0.010
Pas. Grendel Pintu/Jendela - 0.010
Pas. Kait Angin - 0.015
Pas. Handel Pintu - 0.010
Pas. Handel Jendela - 0.010
Pas. Baut, Beugel Angkur -
Pas. Kusen Aluminium 4" Coklat - 0.002 0.004
Pas. Frem/Slimar Jendela Aluminium - 0.002 0.004
Pas. Frem/Slimar Pintu Aluminium - 0.002 0.004
-
-
PEKERJAAN KAP/ ATAP -
Pas. Kuda - Kuda Kayu Jati - 0.020 1.200
Pas. Kuda - Kuda Kayu Mahoni - 0.020 1.200
Ongkos Pasang Kuda - Kuda Lama - 0.020 1.200
Pas. Ikatan Angin dan Balok Apit Kayu Jati - 0.012 0.720
Pas. Ikatan Angin dan Balok Apit Kayu Mahoni - 0.012 0.720
Ongkos Pasang Ikatan Angin dan Balok Apit - 0.012 0.720
Pas. Gording, Jurai Kayu Jati - 0.012 0.720
Pas. Gording, Jurai Kayu Mahoni - 0.012 0.720
Ongkos Pasang Jurai, Gording Kayu Lama - 0.012 0.720
Pas. Papan Reuter Kayu Kruing - 0.003 0.005
Pas. Usuk Kayu Jati - 0.003 0.005
Pas. Usuk Kayu Mahoni - 0.003 0.005
Pas. Reng Kayu Jati - 0.003 0.005
Ongkos Pasang Reng dan Usuk - 0.003 0.005
Pas. Genteng Press Lokal - 0.008 0.008
Ongkos Pasang Genteng Press Lokal - 0.008 0.008
Pas. Bubungan Genteng - 0.002 0.020
Pas. Genteng Kompress - 0.005 0.020
Pas. Lisplank GRC - 0.005 0.020
Pas. Talang BJLS 30 - 0.010 0.025
-
PEKERJAAN LANGIT - LANGIT -
Pas, Rangka Plafond Kayu Kruing - 0.075 0.300
Pas. Rangka Plafond Kayu Mahoni - 0.075 0.300
Pas. Rangka Plafond Hollow - 0.004 0.010
Ongkos Pasang Rangka Plafond - 0.075 0.300
Pas. Kalsiboard 120 x 240 - 0.005 0.010
Pas. List Plafond Kayu Profil - 0.003 0.005
Pas. List Plafond Gypsum - 0.003 0.005
-
PEKERJAAN KERAMIK -
Pas. Keramik Polos 30 x 30 - 0.035 0.035
Pas. Keramik Polos 40 x 40 - 0.035 0.035
Pas. Keramik Polos 25 x 25 - 0.035 0.035
Pas. Keramik Dinding 20 x 25 - 0.045 0.045
Pas. Keramik Lantai 20 x 20 - 0.035 0.035
Pas. Keramik Dinding Uk. 25 x 40 - 0.045 0.045
Pas. Granit Tile Uk. 60 x 60 - 0.013 0.013
Pas. Beton Alur - 0.035 0.035
Pas. Batu Candi 20x20 - 0.035 0.035
-
PEKERJAAN PENGECATAN -
Pek. Plamir - 0.001 0.003
Pengecatan Tembok - 0.002 0.003
Pengecatan Kayu - 0.008 0.015
Pek. Pelapisan Dengan Meni - 0.004
Pengecatan Genteng - 0.004
Pelapisan Kayu Dengan Teer - 0.010
Pek. Polituran - 0.013 0.025
Pengecatan Plafond - 0.003 0.004
Pengecatan Besi - 0.001 0.001
Coating Batu Alam - 0.008 0.015
Pek. Mengikis/Mengerok Cat Tembok Lama - 0.008
Pengecatan Dasar Dinding dengan Cat Alkali - 0.003 0.005
-
PEKERJAAN LISTRIK -
Instalasi Titik Lampu - 0.005
Instalasi Stop Kontak - 0.005
Pas. Lampu SL 11 Watt - 0.024
Pas. Lampu SL 18 Watt - 0.024
Pas. Saklar Tunggal - 0.024
Pas. Saklar Ganda - 0.024
Pas. Stop Kontak - 0.024
Pas. Lampu Slash 400 Watt Komplit - 0.024
Pas. Instalasi Socket Data - 0.020
Pas. Instalasi Telephone - 0.240
Pas. Instalasi AC - 0.250
-
PEKERJAAN BESI BAJA -
Pas. Bata Profil WF, Siku, INP - 0.003 0.006
Pas. Baja CNP - 0.003 0.006
Ongkos Pasang Baja Lama - 0.003 0.006
Pas. Pipa Stainless 2,5" - 0.021 0.004
Pas. Rangka Hollow 40*40*2 - 0.021 0.004
Pas. Plat Aluminium Tbl 2 mm - 0.004 0.009
Pas. Pipa Galvanis 1 ½" - 0.003 0.009
-
PEKERJAAN PERKERASAN -
Normalisasi LPA - 0.008
Pek. Paving K.300 Tbl. 8 Cm - 0.023
Pas. Pengunci Paving ( Uskup ) K.300 - 0.000 0.003
Pas. Kanstine 15*30*50 - 0.001 0.005
Urugan Berm ( Tanah Pilihan ) - 0.012
Pas. Aksesibel / Guiding Block - 0.035 0.035
Paving Stone 10x10x6 K225 Warna - 0.013 0.015
-
Analisa Harga Satuan Pekerjaan Sanitasi / Mekanikal -
Pas. Pipa PVC 3/4" Type AW - 0.002 0.006
Pas. Pipa PVC 1" Type AW - 0.002 0.006
Pas. Pipa PVC 3" Type D - 0.002 0.006
Pas. Pipa PVC 4" Type D - 0.002 0.006
-
PEKERJAAN LANDSCAPING -
1 m2 Tanam Rumput Manila - 0.005

Kepala
PEKERJAAN Volume Mandor
Tukang

Analisa Harga Satuan Pekerjaan Persiapan - - -


1 m1 Pek. Pengukuran dan Pemasangan Bowplank - - -
- - - - -
PEKERJAAN TANAH - - -
1 m3 Pek. Bor Strouss - - -
1 m3 Pek. Galian Tanah 0.500 0.013 -
1 m3 Pek. Galian Tanah Keras - - -
1 m3 Pek. Urugan Kembali 0.130 0.001 -
1 m3 Pek. Urugan Pasir - - -
1 m3 Pek. Urugan Tanah Pilihan 0.150 0.004 -
1 m3 Pek. Urugan Tanah Humus - - -
1 m3 Pek. Urugan Sirtu - - -
- - -
PEKERJAAN PASANGAN - - -
1 m3 Pas. Aanstampeng - - -
1 m3 Pas. Pondasi Batu Kali 1 : 4 - - -
1 m3 Pas. Rollag Bata Merah Camp 1 PC : 3 Ps - - -
1 m2 Pas. Dinding Trasram 1 : 3 - - -
1 m2 Pas. Dinding Biasa 1 : 5 8.400 0.126 0.084
1 m2 Pek. Plesteran Trasram 1 : 3 16.800 0.252 0.252
1 m2 Pek. Plesteran Biasa 1 : 5 - - -
1 m1 Pek. Benangan 8.000 0.032 0.320
1 m2 Pek. Acian 16.800 0.168 0.168
1 m2 Roster - - -
- - - -
PEKERJAAN BETON - - -
1 m3 Pek. Beton Camp. 1 : 2 : 3 1.127 0.090 0.028
1 m3 Pek. Beton Camp. 1 : 3 : 5 0.035 0.004 0.001
1 Kg Pek. Pembesian 214.583 0.086 0.150
1 m2 Pek. Begesting Pondasi 0.250 0.007 0.007
1 m2 Pek. Begesting Sloof - - -
1 m2 Pekerjaan Begesting Kolom 2.280 0.075 0.075
1 m2 Pekerjaan Begesting Balok 0.600 0.020 0.020
1 m2 Pekerjaan Begesting Plat - - -
1 m2 Pemasangan Wiremesh - - -
- - - -
PEKERJAAN KUSEN PINTU JENDELA - - -
- Pas. Kusen Kayu Jati Uk. 6/12 - - -
- Pas. Kusen Kayu Kamper Uk. 6/12 - - -
- Ongkos Pasang Kusen Kayu Lama - - -
- Pas. Daun Pintu Panil Jati - - -
- Pas. Slimar Pintu / Jendela - - -
- Ongkos Pasang Slimar Kayu Lama - - -
- Pas. Kaca Bening 5 mm - - -
- Onghkos Pasang Kaca Lama - - -
- Pas. Papan Jalusi - - -
- Pas. Partisi Double Kalsiboard Rangka Metalstud - - -
- - - -
PEKERJAAN KUNCI / PENGANTUNG - - -
- Pas. Kunci Tanam 1X Putar - - -
- Pas. Kunci Tanam 2X Putar - - -
- Pas. Engsel Pintu - - -
- Pas. Engsel Jendela - - -
- Pas. Grendel Pintu/Jendela - - -
- Pas. Kait Angin - - -
- Pas. Handel Pintu - - -
- Pas. Handel Jendela - - -
- Pas. Baut, Beugel Angkur - - -
- Pas. Kusen Aluminium 4" Coklat - - -
- Pas. Frem/Slimar Jendela Aluminium - - -
- Pas. Frem/Slimar Pintu Aluminium - - -
- - - -
PEKERJAAN KAP/ ATAP - - -
- Pas. Kuda - Kuda Kayu Jati - - -
- Pas. Kuda - Kuda Kayu Mahoni - - -
- Ongkos Pasang Kuda - Kuda Lama - - -
- Pas. Ikatan Angin dan Balok Apit Kayu Jati - - -
- Pas. Ikatan Angin dan Balok Apit Kayu Mahoni - - -
- Ongkos Pasang Ikatan Angin dan Balok Apit - - -
- Pas. Gording, Jurai Kayu Jati - - -
- Pas. Gording, Jurai Kayu Mahoni - - -
- Ongkos Pasang Jurai, Gording Kayu Lama - - -
- Pas. Papan Reuter Kayu Kruing - - -
- Pas. Usuk Kayu Jati - - -
- Pas. Usuk Kayu Mahoni - - -
- Pas. Reng Kayu Jati - - -
- Ongkos Pasang Reng dan Usuk - - -
- Pas. Genteng Press Lokal - - -
- Ongkos Pasang Genteng Press Lokal - - -
- Pas. Bubungan Genteng - - -
- Pas. Genteng Kompress - - -
- Pas. Lisplank GRC - - -
- Pas. Talang BJLS 30 - - -

PEKERJAAN LANGIT - LANGIT - - -


- Pas, Rangka Plafond Kayu Kruing - - -
- Pas. Rangka Plafond Kayu Mahoni - - -
- Pas. Rangka Plafond Hollow - - -
- Ongkos Pasang Rangka Plafond - - -
- Pas. Kalsiboard 120 x 240 - - -
- Pas. List Plafond Kayu Profil - - -
- Pas. List Plafond Gypsum - - -
- - - -
PEKERJAAN KERAMIK - - -
- Pas. Keramik Polos 30 x 30 - - -
- Pas. Keramik Polos 40 x 40 - - -
- Pas. Keramik Polos 25 x 25 - - -
- Pas. Keramik Dinding 20 x 25 - - -
- Pas. Keramik Lantai 20 x 20 - - -
- Pas. Keramik Dinding Uk. 25 x 40 - - -
- Pas. Granit Tile Uk. 60 x 60 - - -
- Pas. Beton Alur - - -
- Pas. Batu Candi 20x20 - - -
- - - -
PEKERJAAN PENGECATAN - - -
- Pek. Plamir - - -
- Pengecatan Tembok - - -
- Pengecatan Kayu - - -
- Pek. Pelapisan Dengan Meni - - -
- Pengecatan Genteng - - -
- Pelapisan Kayu Dengan Teer - - -
- Pek. Polituran - - -
- Pengecatan Plafond - - -
- Pengecatan Besi - - -
- Coating Batu Alam - - -
- Pek. Mengikis/Mengerok Cat Tembok Lama - - -
- Pengecatan Dasar Dinding dengan Cat Alkali - - -
- - - -
PEKERJAAN LISTRIK - - -
- Instalasi Titik Lampu - - -
- Instalasi Stop Kontak - - -
- Pas. Lampu SL 11 Watt - - -
- Pas. Lampu SL 18 Watt - - -
- Pas. Saklar Tunggal - - -
- Pas. Saklar Ganda - - -
- Pas. Stop Kontak - - -
- Pas. Lampu Slash 400 Watt Komplit - - -
- Pas. Instalasi Socket Data - - -
- Pas. Instalasi Telephone - - -
- Pas. Instalasi AC - - -
- - - -
PEKERJAAN BESI BAJA - - -
- Pas. Bata Profil WF, Siku, INP - - -
- Pas. Baja CNP - - -
- Ongkos Pasang Baja Lama - - -
- Pas. Pipa Stainless 2,5" - - -
- Pas. Rangka Hollow 40*40*2 - - -
- Pas. Plat Aluminium Tbl 2 mm - - -
- Pas. Pipa Galvanis 1 ½" - - -
- - - - -
PEKERJAAN PERKERASAN - - -
- Normalisasi LPA - - -
- Pek. Paving K.300 Tbl. 8 Cm - - -
- Pas. Pengunci Paving ( Uskup ) K.300 - - -
- Pas. Kanstine 15*30*50 - - -
- Urugan Berm ( Tanah Pilihan ) - - -
- Pas. Aksesibel / Guiding Block - - -
- Paving Stone 10x10x6 K225 Warna - - -
- - - -
Analisa Harga Satuan Pekerjaan Sanitasi / Mekanikal - - -
- Pas. Pipa PVC 3/4" Type AW - - -
- Pas. Pipa PVC 1" Type AW - - -
- Pas. Pipa PVC 3" Type D - - -
- Pas. Pipa PVC 4" Type D - - -
- - - -
PEKERJAAN LANDSCAPING - - -
1 m2 Tanam Rumput Manila - - -

JUMLAH 0.876 1.105

Pelaksana 7 Hari
1 Mandor 0.876 OH 0.125
2 Kepala Tukang 1.105 OH 0.158
3 Tukang Kayu 1.015 OH 0.145
4 Tukang Batu 8.534 OH 1.219
5 Tukang Besi 1.502 OH 0.215
6 Tukang Cat - OH -
7 Tukang Listrik - OH -
8 Tukang Las - OH -
9 Tukang Aluminium - OH -
10 Tukang Gali - OH -
9 Pekerja 17.467 OH 2.495
-
1 Pasir Urug - m3 -
2 Tanah Urug 0.180 m3 0.026
3 Sirtu - m3 -
4 Batu Belah - m3 -
5 Pasir Pasang 1.473 m3 0.210
6 Semen Portland 10.560 Zak 1.509
7 Batu Bata 588.000 Bh 84.000
8 Roster - Bh -
9 Batu Pecah 2/3 0.930 m3 0.133
10 Papan Begesting 0.125 m2 0.018
11 Kayu Perencah 0.045 m3 0.006
12 Minyak Begesting 0.601 Ltr 0.086
13 Plywood Tbl 9 mm 1.008 Lbr 0.144
14 Besi Strip - Kg -
15 Paku Biasa 1.227 Kg 0.175
16 Paku Kalsiboard - Kg -
17 Seng BJLS 30 - m1 -
18 Besi Beton Ø 6 mm 3.852 Btg 0.550
19 Besi Beton Ø 8 mm - Btg -
20 Besi Beton Ø 10 mm 0.273 Btg 0.039
21 Besi Beton Ø 12 mm 10.701 Btg 1.529
22 Besi Beton Ø 13 mm - Btg -
23 Besi Beton Ø 16 mm - Btg -
24 Besi Beton 225.312 Kg 32.187
25 Kawat Beton 3.219 Kg 0.460
26 Wiremesh M8 - m2 -
27 Baja Siku/WF - Kg -
28 Baja CNP - Kg -
29 Lem Kayu - Kg -
30 Profil Aluminium 4" Coklat - Bh -
31 Frem / Slimar Jendela Aluminium - Bh -
32 Frem / Slimar Pintu Aluminium - Bh -
33 Skrup Fixer - Bh -
34 Sealant - Tube -
35 Reng Kayu Jati - m3 -
36 Kayu Jati Kaso - m3 -
37 Kayu Jati Balok - m3 -
38 Kayu Jati Papan - m3 -
39 Kayu Kamper Balok - m3 -
40 Kayu Mahoni Kaso - m3 -
41 Kayu Mahoni Balok - m3 -
42 Kayu Kruing Kaso - m3 -
43 Kayu Kruing Papan - m3 -
44 Lisplank GRC - Lbr -
45 List Kayu Profil - m1 -
46 Kalsiboard 120x240 - Lbr -
47 Kalsiboard 120 x 240 x 8 mm - Lbr -
48 List Gypsum - m1 -
49 Tepung Gypsum - Kg -
50 Genteng Press - Bh -
51 Bubungan Genteng - Bh -
52 Genteng Kompress - Bh -
53 Keramik 30 x 30 - Bh -
54 Keramik 40 x 40 - Bh -
55 Keramik 25 x 25 - Bh -
56 Keramik 20 x 25 - Bh -
57 Keramik 20 x 20 - Bh -
58 Keramik 25 x 40 ( Motif ) - Bh -
59 Granit Uk. 60 x 60 - Bh -
60 Beton Alur - m2 -
61 Batu Candi 20x20 - m2 -
62 Semen Warna - Kg -
63 Kaca Bening 5 mm - m2 -
64 Kunci Tanam 1X Putar - Bh -
65 Kunci Tanam 2X Putar - Bh -
66 Engsel Pintu - Bh -
67 Engsel Jendela - Bh -
68 Grendel Pintu/Jendela - Bh -
69 Kait Angin - Bh -
70 Handel Pintu - Bh -
71 Handel Jendela - Bh -
72 Baut, Beugel Angkur - Kg -
73 Pas. Lampu SL 10 Watt - Bh -
74 Pas. Lampu SL 20 Watt - Bh -
75 Pas. Saklar Tunggal - Bh -
76 Pas. Saklar Ganda - Bh -
77 Pas. Stop Kontak - Bh -
78 Kabel ITC 2 x 2 x 0,6mm2 - m1 -
79 Kabel NYA 2,5 mm2 - m1 -
80 Kabel NYY 3 x 2,5" -
81 Pipa Paralon 5/8" - Ljr -
82 Isolator - Bh -
83 Las Doof - Bh -
84 T dos PVC - Bh -
85 sock 20 mm - Bh -
86 Klem pipa - Bh -
87 Socket Outlet Data - Bh -
88 Fitting Lampu - Bh -
89 Amplas - Lbr -
90 Plamir Tembok - Kg -
91 Cat Tembok - Kg -
92 Cat Kayu - Kg -
93 Meni Kayu - Kg -
94 Minyak Cat - Ltr -
95 Cat Genteng - Kg -
96 Cat Besi - Kg -
97 Cat Alkali - Kg -
98 Coating Batu Alam - Kg -
99 Teer - Kg -
100 Sirlack - Kg -
101 Spirtus - Ltr -
102 Pipa Stainless 3" Tbl 2,7 mm - m1 -
103 Hollow 40*40*2 - m1 -
104 Hollow 20*40*2 - m1 -
105 Metal Stud - m1 -
106 Plat Aluminium - m2 -
107 Lampu Slash 400 Watt Komplit - Bh -
108 Pipa Galvanis 1 ½" - m1 -
109 Agregat A - m3 -
110 Wheel Loader - Jam -
111 Dump Truck - Jam -
112 Motor Grader - Jam -
113 Tandem Roller - Jam -
114 Water Tanker - Jam -
115 Alat Bantu - Ls -
116 Paving Block - m2 -
117 Pasir Pengisi Nat - m3 -
118 Steel Whell Roller - Jam -
119 Topi Uskup / Pengunci Paving - Bh -
120 Kanstin Uk. 15 x 30 x 50 - Bh -
121 Vibrator Compector / Stemper - Hari/Sewa -
122 Paving Block Aksesibel - Bh -
123 Paving Stone 10x10x6 K225 Warna - Bh -
124 Pipa PVC 3/4" Type AW - m1 -
125 Pipa PVC 1" Type AW - m1 -
126 Pas. Pipa PVC 3" Type D - m1 -
127 Pipa PVC 4" Type D - m1 -
128 Perlengkapan - % -
129 Tanah Humus - m3 -
130 Rumput Manila - m2 -

6 10 12
1 Pek. Strous Dia. 25 Cm
2 Pek. Sloof Uk. 15 x 20 (S1) 10.000 2.000
3 Pek. Kolom Uk. 12 x 15 (K1) 48.000
4 Pek. Balok Latai Uk. 12 x 15 (BL)
5 Pek. Balok Uk. 12 x 20 (B1) 32.000
6 Pek. Ring Balk Uk. 12 x 15 (RB) 32.000
7 Pek. Ring Gewel Uk. 12 x 15
8 Pek. Pondasi Beton
9
10
11
11

10.000 2.000 112.000

114.000
9.500
1.015 8.534 1.502 - - - - - 17.467 -

Tukang
Tukang Tukang Tukang Tukang Tukang Tukang
Tukang Batu Aluminiu Pekerja Pasir Urug
Kayu Besi Cat Listrik Las Gali
m

0.100 0.100

0.500
0.750
0.750
0.250
0.300 1.200
0.250
0.250
0.250

0.390 0.780 0.432


0.600 1.500
0.020 0.600
0.100 0.300
0.100 0.300
0.150 0.300
0.150 0.300
0.400 0.080
0.100 0.200
0.100 0.300

0.250 1.650
0.350 2.000
0.007 0.007
0.260 0.520
0.260 0.520
0.330 0.660
0.330 0.660
0.330 0.660
0.025 0.025

21.000 7.000
21.000 7.000
21.000 7.000
3.000 1.000
2.400 0.800
2.400 0.800
0.160 0.160
0.160 0.160
3.000 1.000
0.450 0.150

0.250
0.250
0.125
0.100
0.100
0.150
0.100
0.100
0.041
0.043 0.043
0.043 0.043
0.043 0.043

12.000 4.000
12.000 4.000
12.000 4.000
7.200 2.400
7.200 2.400
7.200 2.400
7.200 2.400
7.200 2.400
7.200 2.400
0.050 0.050
0.050 0.050
0.050 0.050
0.050 0.050
0.050 0.050
0.075 0.150
0.075 0.150
0.200 0.400
0.200 0.400
0.200 0.100
0.400 0.200

0.300 0.150
0.300 0.150
0.100 0.070
0.300 0.150
0.100 0.100
0.050 0.050
0.050 0.100

0.350 0.700
0.350 0.700
0.350 0.700
0.450 0.900
0.350 0.700
0.450 0.900
0.125 0.250
0.350 0.700
0.350 0.700

0.030 0.020
0.030 0.040
0.150 0.150
0.075
0.075
0.100
0.250
0.040 0.060
0.150 0.020
0.150 0.150
0.150
0.050 0.060

0.500 0.050
0.500 0.050
0.150 0.020
0.150 0.020
0.150 0.020
0.150 0.020
0.150 0.020
0.150 0.020
0.100 0.240
0.100 0.240
0.250 0.500

0.060 0.060
0.060 0.060
0.060 0.060
0.043 0.043
0.043 0.043
0.085 0.085
0.090 0.054

0.059
0.093 0.140 0.060
0.031 0.063
0.050 0.075
0.330
0.350 0.700
0.150 0.305 0.042

0.060 0.036
0.060 0.036
0.060 0.036
0.060 0.036

0.050

Tukang
Tukang Tukang Tukang Tukang Tukang Tukang
Tukang Batu Aluminiu Pekerja Pasir Urug
Kayu Besi Cat Listrik Las Gali
m

- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - 0.375 -
- - - - - - - - - -
- - - - - - - - 0.033 -
- - - - - - - - - -
- - - - - - - - 0.038 -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- 0.840 - - - - - - 2.520 -
- 2.520 - - - - - - 5.040 -
- - - - - - - - - -
- 3.200 - - - - - - 0.640 -
- 1.680 - - - - - - 3.360 -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- 0.282 - - - - - - 1.860 -
- 0.012 - - - - - - 0.070 -
- - 1.502 - - - - - 1.502 -
0.065 - - - - - - - 0.130 -
- - - - - - - - - -
0.752 - - - - - - - 1.505 -
0.198 - - - - - - - 0.396 -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -
- - - - - - - - - -

1.015 8.534 1.502 - - - - - 17.467 -

6 Hari 88.547 12.650


0.146
0.184
0.169
1.422
0.250
-
-
-
-
-
2.911
-
-
0.030
-
-
0.246
1.760
98.000
-
0.155
0.021
0.008
0.100
0.168
-
0.205
-
-
0.642
-
0.046
1.783
-
-
37.552
0.536

-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

13 8 16

- - -

600,000.00
175.00
11,375.00
6,825,000.00
0.180 - - 1.473 527.995 588.000 - 0.930 225.312

Semen Batu Pecah


Tanah Urug Sirtu Batu Belah Pasir Pasang Batu Bata Roster Besi Beton
Portland 2/3

1.200

0.200

1.200
1.100 0.520 163.000
0.091 32.950 140.000
0.040 14.370 70.000
0.045 9.680 70.000
0.023 7.776
0.026 5.184
0.013 0.500
3.250
0.035 12.800 36.000

0.520 218.000 0.800


0.540 336.000 0.810
1.050
0.045 10.000
0.045 9.800
0.045 10.400
0.045 10.000
0.045 10.000
0.018 9.300
0.045 9.800
0.035 11.750
0.035 11.750
0.008
0.008 0.320
1.200
0.045 10.400

Semen Batu Pecah


Tanah Urug Sirtu Batu Belah Pasir Pasang Batu Bata Roster Besi Beton
Portland 2/3

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
0.180 - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 0.378 81.312 588.000 - - -
- - - 0.386 130.637 - - - -
- - - - - - - - -
- - - 0.104 4.000 - - - -
- - - - 54.600 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - 0.586 245.686 - - 0.902 -
- - - 0.019 11.760 - - 0.028 -
- - - - - - - - 225.312
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

0.180 - - 1.473 527.995 588.000 - 0.930 225.312


3.219 0.125 0.045 0.601 1.227 - - - -

Papan Kayu Minyak Paku Kayu Jati


Kawat Beton Paku Biasa Seng BJLS 30 Lem Kayu
Begesting Perencah Begesting Kalsiboard Balok

0.020

0.015
0.040 0.100 0.300
0.045 0.100 0.300
0.040 0.015 0.200 0.400
0.040 0.018 0.200 0.400
0.400 0.015 0.200 0.400

1.250 1.000 1.000


1.250 1.000
1.250 1.000
0.500
0.300
0.300

0.050

5.600
5.600
5.600
3.000
3.000
3.000
3.000
3.000
3.000
0.075
0.125
0.125
0.125
0.125

0.050
0.015 1.050

0.200
0.200

0.200
0.030
0.010

0.025
Kawat Papan Kayu Minyak Paku Kayu Jati
Paku Biasa Seng BJLS 30 Lem Kayu
Beton Begesting Perencah Begesting Kalsiboard Balok

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
3.219 - - - - - - - -
- 0.010 - 0.025 0.075 - - - -
- - - - - - - - -
- 0.091 0.034 0.456 0.912 - - - -
- 0.024 0.011 0.120 0.240 - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

3.219 0.125 0.045 0.601 1.227 - - - -


- - - - - - - - -

Kayu Kayu
Kayu Jati Kaca Bening Kayu Jati Kayu Kruing Kayu Jati Kayu
Kamper Mahoni Besi Strip
Papan 5 mm Balok Papan Kaso Mahoni Kaso
Balok Balok

0.007 0.012

1.000

0.040
0.024

1.100

0.006

1.100 15.000
1.100 15.000
15.000
1.100 15.000
1.100 15.000
15.000
1.100 15.000
1.100 15.000
15.000
0.004
0.010
0.010

0.004

0.010
Kayu Kayu
Kayu Jati Kaca Bening Kayu Jati Kayu Kruing Kayu Jati Kayu
Kamper Mahoni Besi Strip
Papan 5 mm Balok Papan Kaso Mahoni Kaso
Balok Balok

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Reng Kayu Genteng Bubungan Genteng Kayu Kruing List Kayu Keramik 30 x
Lisplank GRC Kalsiboard
Jati Press Genteng Kompress Kaso Profil 30
0.006

25.000

5.000
5.000
0.250
0.250

0.010

0.375
1.050

11.870
Reng Kayu Genteng Bubungan Genteng Lisplank Kayu Kruing List Kayu Keramik 30
Kalsiboard
Jati Press Genteng Kompress GRC Kaso Profil x 30

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Keramik 40 x Keramik 25 x Keramik 20 x Keramik 20 x Semen Baja Plamir


Baja CNP Amplas
40 25 25 20 Warna Siku/WF Tembok
1.500
6.630 1.300
16.800 1.620
21.200 1.620
26.500 1.500
1.940
1.300

0.500 0.100

2.000

1.050
1.050
Keramik 40 Keramik 25 Keramik 20 Keramik 20 Semen Baja Plamir
Baja CNP Amplas
x 40 x 25 x 25 x 20 Warna Siku/WF Tembok

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Cat Tembok Cat Kayu Meni Kayu Minyak Cat Cat Genteng Cat Besi Teer Sirlack Spirtus
0.470
0.300 0.200
0.170 0.100
0.100 0.170
0.350
0.150 0.372
0.470
0.300 0.400
Cat Tembok Cat Kayu Meni Kayu Minyak Cat Cat Genteng Cat Besi Teer Sirlack Spirtus

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
-
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
1.008 - - - - - - - -

Pipa Plat Lampu Slash


Plywood Tbl Tepung Hollow Pipa
List Gypsum Stainless 3" Aluminium 400 Watt Agragat A
9 mm Gypsum 40*40*2 Galvanis 1 ½"
Tbl 2,7 mm Tbl 2 mm Komplit

0.350
0.350
0.350
1.833

1.050 0.150

1.000

1.100
1.100
1.050
1.200

1.259
Pipa Plat Lampu Slash Pipa
Plywood Tbl Tepung Hollow
List Gypsum Stainless 3" Aluminium 400 Watt Galvanis 1 Agragat A
9 mm Gypsum 40*40*2
Tbl 2,7 mm Tbl 2 mm Komplit ½"

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
0.798 - - - - - - - -
0.210 - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

1.008 - - - - - - - -
- - - - - - - - -

Wheel Motor Tandem Water Pasir Pengisi Steel Whell


Dump Truck Alat Bantu Paving Block
Loader Grader Roller Tanker Nat Roller
0.008 0.336 0.004 0.003 0.014 1.000
1.000 1.000 0.001 0.008

Wheel Motor Tandem Water Pasir Pengisi Steel Whell


Dump Truck Alat Bantu Paving Block
Loader Grader Roller Tanker Nat Roller

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Paving Frem /
Topi Uskup / Vibrator Profil Frem /
Kanstin Uk. Paving Block Stone Hollow Slimar
Pengunci Compector / Aluminium Slimar Pintu
15 x 30 x 50 Aksesibel 10x10x6 20*40*2 Jendela
Paving Stemper K225 Warna 4" Coklat Aluminium Aluminium

1.100
1.100
1.100
1.833
3.333
2.000
0.050
1.000
1.000

Topi Vibrator Paving Profil Frem / Frem /


Uskup / Kanstin Uk. Paving Block Stone Hollow Slimar
Compector / Aluminium Slimar Pintu
Pengunci 15 x 30 x 50 Aksesibel 10x10x6 20*40*2 Jendela
Stemper 4" Coklat Aluminium
Paving K225 Warna Aluminium

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Pipa PVC Pas. Pipa


Pipa PVC 1" Pipa PVC 4" Keramik 25 x Granit Uk.
Skrup Fixer Sealant 3/4" Type PVC 3" Type Perlengkapa
Type AW Type D 40 ( Motif ) 60 x 60
AW D n

2.000 0.060
2.000 0.060
2.000 0.060
10.600
3.100
1.200 0.350
1.200 0.350
1.200 0.350
1.200 0.350

Pipa PVC Pas. Pipa


Pipa PVC 1" Pipa PVC 4" Keramik 25 Granit Uk.
Skrup Fixer Sealant 3/4" Type PVC 3" Type Perlengkapa
Type AW Type D x 40 ( Motif ) 60 x 60
AW D n

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Socket Kabel ITC 2 x Isolasi/Las Kabel NYA


Beton Alur Pipa conduit Klem pipa T dos sock 20 mm
Outlet Data 2 x 0,6mm2 dop 2,5 mm2
1.100

1.000 2.000 1.000 7.500


0.200 1.000

1.000
20.000 6.667 4.000 1.000 4.000 2.000
1.000 1.000 5.000
Socket Kabel ITC 2 x Isolasi/Las Kabel NYA
Beton Alur Pipa conduit Klem pipa T dos sock 20 mm
Outlet Data 2 x 0,6mm2 dop 2,5 mm2

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Kalsiboard
Fitting Kabel NYY 3 Tanah Rumput Coating Batu
Cat Alkali Batu Candi 120 x 240 x 8 Metal Stud
Lampu x 2,5" Humus Manila Alam
mm

1.200

0.694 1.600
1.100

0.300

0.240

1.000
4.000
1.000

Kalsiboard
Fitting Kabel NYY 3 Tanah Rumput Coating
Cat Alkali Batu Candi 120 x 240 x 8 Metal Stud
Lampu x 2,5" Humus Manila Batu Alam
mm

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -

Wiremesh
M8

1.200
Wiremesh
- - - - - - - -
M8

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -
- - - - - - - - -

- - - - - - - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -

- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

- - - -
REKAPITULASI
HARGA SATUAN POKOK PEKERJAAN

Kegiatan : Pembanguan Rumah

Pekerjaan : Pembanguan Rumah BU Diana

No. Uraian Pekerjaan Quantity Harga Satuan

A Analisa Harga Satuan Pekerjaan Persiapan


1 Pek. Pengukuran dan Pemasangan Bowplank 1 m¹ Rp.
2 Pembuatan Kantor Sementara 1 m² Rp.
-
B Analisa Harga Satuan Pekerjaan Tanah
1 Pek. Galian Tanah Biasa Sedalam 1 m 1 m³ Rp.
2 Pek. Urugan Kembali Untuk Galian Tanah Biasa 1 m³ Rp.
3 Pek. Urugan Pasir 1 m³ Rp.
4 Pek. Urugan Tanah Pilihan Dipadatkan 1 m³ Rp.

C Analisa Harga Satuan Pekerjaan Pondasi


1 Pasang Pondasi Batu Belah Camp. 1 PC : 5 Ps 1 m³ Rp.
2 Pasang Batu Kosongan ( Aanstampeng ) 1 m³ Rp.
3 Pasang Pondasi Rollag Bata Merah Camp. 1 PC : 3 Ps 1 m³ Rp.

D Analisa Harga Satuan Pekerjaan Pasangan


1 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 3 Ps 1 m² Rp.
2 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 6 Ps 1 m² Rp.

E Analisa Harga Satuan Pekerjaan Plesteran


1 Pek. Plesteran Camp. 1 PC : 3 Ps Tbl. 15 mm 1 m² Rp.
2 Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm 1 m² Rp.
3 Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps 1 m¹ Rp.
4 Pek. Acian 1 m² Rp.

F Analisa Harga Satuan Pekerjaan Beton


1 Pek. Beton Mutu f'c = 7,4 MPa (K.100) Slump (12 ± 2) Cm 1 m³ Rp.
2 Pek. Beton Mutu f'c = 9,8 MPa (K.125) Slump (12 ± 2) Cm 1 m³ Rp.
3 Pek. Beton Mutu f'c = 19,3 MPa (K.225) Slump (12 ± 2) Cm 1 m³ Rp.
4 Pek. Pembesian dengan Besi Beton Polos 1 Kg Rp.
5 Pek. Pembesian dengan Besi Beton Ulir 1 Kg Rp.
6 Pek. Pembesian dengan Besi Wiremess 1 Kg Rp.
7 Pemasangan Begesting Untuk Pondasi 1 m² Rp.
8 Pemasangan Begesting Untuk Sloof 1 m² Rp.
9 Pemasangan Begesting Untuk Kolom 1 m² Rp.
10 Pemasangan Begesting Untuk Balok 1 m² Rp.
11 Pemasangan Begesting Untuk Plat 1 m² Rp.
12 Pemasangan Begesting Untuk Tangga 1 m² Rp.
-
G Analisa Harga Satuan Pekerjaan Kayu
1 Pembuatan dan Pemasangan Kusen Kayu Kamper/Bengkirai 1 m³ Rp.
2 Pembuatan dan Pemasangan Daun Pintu Panil Kayu Kamper/Bengkirai 1 m² Rp.
3 Pasang Lisplank GRC Lebar 30 Cm 1 m¹ Rp.
H Analisa Harga Satuan Pekerjaan Kunci dan Kaca
1 Pasang Kunci Tanam 2X Putar 1 Bh Rp.
2 Pasang Kunci Pintu Floorhing 1 Bh Rp.
3 Pasang Kunci Pintu Geser / Sliding 1 Bh Rp.
4 Pasang Engsel Pintu Type Ball Bearing 1 Bh Rp.
5 Pasang Engsel Pintu Floorhing 1 Set Rp.
6 Pasang Engsel Angin 1 Bh Rp.
7 Pasang Kait Angin 1 Bh Rp.
8 Pasang Lever Handel Pintu 1 Bh Rp.
9 Pasang Pull Handel Pintu 1 Bh Rp.
10 Pasang Kunci Slot / Grendel Pintu 1 Bh Rp.
11 Pasang Kunci Slot / Grendel Jendela 1 Bh Rp.
12 Pasang Kaca Bening Tbl 6 mm 1 m² Rp.
13 Pasang Kaca Tempered 10 mm 1 m² Rp.
14 Pasang Kaca Tempered 12 mm 1 m² Rp.

H Analisa Harga Satuan Pekerjaan Penutup Atap


1 Pasang Genteng Beton 1 m² Rp.
2 Pasang Bubungan Genteng Beton 1 m¹ Rp.
-
I Analisa Harga Satuan Pekerjaan Langit - Langit
1 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm 1 m² Rp.
2 Pasang Gypsumboard Uk. 120 x 240 1 m² Rp.
3 Pasang List Plafond Gypsum 1 m¹ Rp.
-
J Analisa Harga Satuan Pekerjaan Lantai dan Pelapis Dinding
1 Pasang Lantai Keramik Uk. 30 x 30 (Teksture) 1 m² Rp.
2 Pasang Lantai Keramik Uk. 10 x 10 1 m² Rp.
3 Pasang Lantai Keramik Uk. 50 x 50 (Polos) 1 m² Rp.
4 Pasang Granit Tile Warna Gelap 1 m² Rp.
5 Pasang Dinding Marmer 1 m² Rp.
6 Pasang Keramik Dinding Uk. 30 x 60 1 m² Rp.
7 Pasang Batu Andesit 1 m² Rp.
8 Pasang Batu Ampyangan ( Koral Sikat ) 1 m² Rp.
9 Pasang Batu Palimanan 1 m² Rp.
10 Pas. Lantai Parquet jati 1 m² Rp.
11 Pas.wood Composit Panel 1 m² Rp.
12 Pas.Kayu Jati Fin Melamik 1 m² Rp.

K Analisa Harga Satuan Pekerjaan Besi/Aluminium


1 Pemasangan Besi Baja Profil 1 Kg Rp.
2 Pemasangan Rangka Atap Galvalume System 1 m² Rp.
2 Pemasangan Reng Usuk Galvalume System 1 m² Rp.
3 Pemasangan Rangka Plafond Hollow Zincromate 1 m² Rp.
4 Pasang Aluminium Composite Panel ( ACP ) 1 m² Rp.
-
L Analisa Harga Satuan Pekerjaan Pengecatan
1 Pek. Plamir Dinding 1 m² Rp.
2 Pek. Pengecatan Dasar Dengan Alkali Shealer 1 m² Rp.
3 Pengecatan Dinding Emultion 2 Lapis Dengan Roll 1 m² Rp.
4 Pengecatan Dinding Watersheald 2 Lapis Dengan Roll 1 m² Rp.
5 Pek. Coating Batu Alam 1 m² Rp.
6 Pek. Waterprofing Dengan Cat Watersheald 1 m² Rp.
7 Pek. Finishing Melamik Daun Pintu 1 m² Rp.
8 Pek. Finishing Melamik Kusen/Slimar 1 m¹ Rp.

M Analisa Harga Satuan Pekerjaan Sanitasi


1 Pasang Closet Duduk 1 Bh Rp.
2 Pasang Closet Jongkok 1 Bh Rp.
3 Pasang Wastafel 1 Bh Rp.
4 Pasang Bak Cuci Piring Stainless 1 Bh Rp.
5 Pasang Avur/Floor Drain/Roof Drain 1 Bh Rp.
6 Pasang Kran Air Biasa Stainless 1 Bh Rp.
7 Pasang Shower Mandi/Hand Shower 1 Bh Rp.
8 Pasang Shower Closet /Spray Shower 1 Bh Rp.
9 Pasang Pipa PVC 3/4" Type AW 1 m¹ Rp.
10 Pasang Pipa PVC 1" Type AW 1 m¹ Rp.
11 Pasang Pipa PVC 1 ½" Type AW 1 m¹ Rp.
12 Pasang Pipa PVC 3" Type AW 1 m¹ Rp.
13 Pasang Pipa PVC 4" Type AW 1 m¹ Rp.
-
N Analisa Harga Satuan Pekerjaan Elektrikal
1 Penarikan Kabel NYY 3 x 2,5 mm² 1 m¹ Rp.
2 Pasang Lampu Downlight Washer Led MR 16 1 Bh Rp.
3 Pasang Lampu DownLight LED 12 Watt Komplit 1 Bh Rp.
4 Pasang Lampu PendanLamp Komplit 1 Bh Rp.
5 Pasang Lampu Dinding 1 Bh Rp.
6 Pasang Lampu Floodlight 1 Bh Rp.
7 Pasang Downlight 12 watt Komplit 1 Bh Rp.
8 Pasang Indireck led T5 1 Bh Rp.
9 Pasang Stop Kontak 1 Bh Rp.
10 Pasang Saklar Tunggal 1 Bh Rp.
11 Pasang Saklar Ganda 1 Bh Rp.
12 Pasang Intalasi Titik Lampu 1 Ttk Rp.
13 Pasang Instalasi Stop Kontak 1 Ttk Rp.
14 Pasang AC 1/2 PK Split Wall Maunted 1 Unit Rp.
15 Pasang AC 1 PK Split Wall Maunted 1 Unit Rp.
15 Pasang AC 2 PK Split Wall Maunted 1 Unit Rp.
16 Pasang AC 1,5 PK Split Wall Maunted 1 Unit Rp.
17 Pasang Exhaust Fan 110 Cfm Ceiling Mounted 1 Unit Rp.
18 Pasang Instalasi AC / Exhaust 1 Ttk Rp.
19 Pasang Pipa Drain 5/8 1 m¹ Rp.

O Analisa Harga Satuan Pekerjaan Taman


1 Pek. Urugan Tanah Humus 1 m³ Rp.
2 Tanam Rumput Gajah Mini 1 m² Rp.
P Analisa Harga Satuan Pekerjaan Pintu/Jendela/Partisi
1 Pasang Pintu Type 1 (PU) 1 Unit Rp.
2 Pasang Pintu Type 1 ( P1 ) 1 Unit Rp.
3 Pasang Pintu Type 2 ( P2 ) 1 Unit Rp.
4 Pasang Pintu TypePS( PS1 ) 1 Unit Rp.
5 Pasang Pintu TypePS2 ( PS2 ) 1 Unit Rp.
6 Pasang Jendela Type 1 ( J1 ) 1 Unit Rp.
7 Pasang Jendela Type2 ( J2 ) 1 Unit Rp.
8 Pasang Jendela Type3 ( J3 ) 1 Unit Rp.
9 Pasang Jendela Type4 ( J4 ) 1 Unit Rp.
10 Pasang Jendela Type5 ( J5 ) 1 Unit Rp.
14 Pasang Boven Type1 ( BV1 ) 1 Unit Rp.
15 Pasang Boven Type2 ( BV2 ) 1 Unit Rp.
16 Pasang Skyligt Depan 1 Unit Rp.
17 Pasang Skyligt Tengah 1 Unit Rp.
18 Pasang Skyligt Belakang kayu Lattice 1 Unit Rp.

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
REKAPITULASI
ARGA SATUAN POKOK PEKERJAAN

Harga Satuan

82,390.00
857,880.00

63,130.00
21,040.00
212,090.00
104,130.00

732,020.00
362,540.00
966,790.00

116,330.00
109,480.00

58,230.00
54,180.00
23,870.00
32,130.00

944,010.00
983,010.00
1,109,930.00
11,600.00
12,070.00
10,880.00
163,580.00
174,570.00
299,340.00
311,370.00
335,340.00
277,340.00

12,244,680.00
788,190.00
48,230.00
124,000.00
700,000.00
146,500.00
32,350.00
1,812,550.00
22,600.00
23,500.00
37,000.00
235,000.00
24,400.00
16,660.00
182,170.00
790,030.00
800,890.00

113,650.00
108,480.00

331,370.00
37,170.00
28,300.00

202,320.00
192,700.00
195,100.00
319,560.00
373,100.00
244,350.00
250,360.00
166,660.00
270,160.00
343,060.00
192,690.00
319,190.00

24,300.00
159,790.00
96,330.00
89,880.00
831,830.00
7,200.00
20,980.00
17,030.00
38,180.00
48,250.00
48,250.00
181,600.00
90,800.00

2,840,550.00
409,800.00
709,040.00
345,130.00
29,430.00
83,430.00
101,430.00
83,430.00
18,900.00
20,990.00
32,670.00
66,930.00
91,210.00

29,790.00
168,600.00
177,600.00
357,600.00
402,600.00
411,600.00
159,600.00
32,860.00
31,890.00
29,820.00
33,060.00
157,530.00
105,100.00
2,735,700.00
3,185,700.00
5,885,700.00
3,635,700.00
440,700.00
169,470.00
12,780.00

163,530.00
27,130.00
3,627,690.00
3,692,970.00
3,523,760.00
9,743,430.00
10,336,640.00
4,062,210.00
14,581,690.00
3,449,610.00
2,780,900.00
2,639,910.00
1,013,730.00
1,309,180.00
33,226,690.00
6,739,610.00
5,384,620.00

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
Harga Satuan Pekerjaan Konstruksi 176

HARGA SATUAN POKOK PEKERJAAN


( HSPK )

Kegiatan : Pembanguan Rumah


Pekerjaan : Pembanguan Rumah BU Diana

No. Uraian Satuan Koefisien Harga Satuan Jumlah Harga

1 2 3 4 5 6

A Analisa Harga Satuan Pekerjaan Persiapan

1 1 m¹ Pek. Pengukuran dan Pemasangan Bowplank


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Kayu Balok 5/7 m3 0.012 Rp. 4,010,580.00 Rp. 48,126.96
Paku Kayu 2" - 3 " Kg 0.020 Rp. 12,240.00 Rp. 244.80
Kayu Papan 3/20 m3 0.007 Rp. 2,199,330.00 Rp. 15,395.31

Jumlah Total Rp. 82,392.07


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 82,392.07
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 82,390.00

2 1 m² Pembuatan Kantor Sementara


Tenaga
Pekerja OH 2.000 Rp. 80,000.00 Rp. 160,000.00
Tukang Kayu OH 2.000 Rp. 90,000.00 Rp. 180,000.00
Tukang Batu OH 1.000 Rp. 90,000.00 Rp. 90,000.00
Kepala Tukang OH 0.300 Rp. 100,000.00 Rp. 30,000.00
Mandor OH 0.050 Rp. 125,000.00 Rp. 6,250.00
Bahan
Kayu Dolken Ø 8 - 10 / 400 Cm Btg 1.250 Rp. 9,000.00 Rp. 11,250.00
Usuk 4/6 Kayu Lokal m3 0.018 Rp. 4,500,000.00 Rp. 81,000.00
Paku Kayu Kg 0.080 Rp. 12,240.00 Rp. 979.20
Semen Portland Kg 35.000 Rp. 1,500.00 Rp. 52,500.00
Pasir Pasang m3 0.150 Rp. 247,500.00 Rp. 37,125.00
Pasir Beton m3 0.100 Rp. 247,500.00 Rp. 24,750.00
Bata Merah Bh 30.000 Rp. 700.00 Rp. 21,000.00
Seng Gelombang m2 1.100 Rp. 40,500.00 Rp. 44,550.00
Seng Plat BJLS 30 m1 0.250 Rp. 36,000.00 Rp. 9,000.00
Kaca Bening Tbl 5 mm m2 0.080 Rp. 142,200.00 Rp. 11,376.00
Kaca Nako Bh 2.000 Rp. 31,500.00 Rp. 63,000.00
Plywood Tbl 4 mm Lbr 0.600 Rp. 58,500.00 Rp. 35,100.00

Jumlah Total Rp. 857,880.20


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 857,880.20
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 857,880.00
Harga Satuan Pekerjaan Konstruksi 177

1 2 3 4 5 6

B Analisa Harga Satuan Pekerjaan Tanah


1 1 m³ Pek. Galian Tanah Biasa Sedalam 1 m
Tenaga
Pekerja OH 0.750 Rp. 80,000.00 Rp. 60,000.00
Mandor OH 0.025 Rp. 125,000.00 Rp. 3,125.00

Jumlah Total Rp. 63,125.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 63,125.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 63,130.00

2 1 m³ Pek. Urugan Kembali Untuk Galian Tanah Biasa


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Mandor OH 0.008 Rp. 125,000.00 Rp. 1,041.67

Jumlah Total Rp. 21,041.67


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 21,041.67
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 21,040.00

3 1 m³ Pek. Urugan Pasir


Tenaga
Pekerja OH 0.300 Rp. 80,000.00 Rp. 24,000.00
Mandor OH 0.010 Rp. 125,000.00 Rp. 1,250.00
Bahan
Pasir Urug m3 1.200 Rp. 155,700.00 Rp. 186,840.00

Jumlah Total Rp. 212,090.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 212,090.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 212,090.00

4 1 m³ Pek. Urugan Tanah Pilihan Dipadatkan


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Mandor OH 0.025 Rp. 125,000.00 Rp. 3,125.00
Bahan
Tanah Urug Pilihan m3 1.200 Rp. 67,500.00 Rp. 81,000.00

Jumlah Total Rp. 104,125.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 104,125.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 104,130.00
Harga Satuan Pekerjaan Konstruksi 178

1 2 3 4 5 6

C Analisa Harga Satuan Pekerjaan Pondasi

1 1 m³ Pasang Pondasi Batu Belah Camp. 1 PC : 5 Ps


Tenaga
Pekerja OH 1.500 Rp. 80,000.00 Rp. 120,000.00
Tukang Batu OH 0.750 Rp. 90,000.00 Rp. 67,500.00
Kepala Tukang OH 0.075 Rp. 100,000.00 Rp. 7,500.00
Mandor OH 0.075 Rp. 125,000.00 Rp. 9,375.00
Bahan
Batu Belah m3 1.200 Rp. 157,500.00 Rp. 189,000.00
Semen Portland Kg 136.000 Rp. 1,500.00 Rp. 204,000.00
Pasir Pasang m3 0.544 Rp. 247,500.00 Rp. 134,640.00

Jumlah Total Rp. 732,015.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 732,015.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 732,020.00

2 1 m³ Pasang Batu Kosongan ( Aanstampeng )


Tenaga
Pekerja OH 0.780 Rp. 80,000.00 Rp. 62,400.00
Tukang Batu OH 0.390 Rp. 90,000.00 Rp. 35,100.00
Kepala Tukang OH 0.039 Rp. 100,000.00 Rp. 3,900.00
Mandor OH 0.039 Rp. 125,000.00 Rp. 4,875.00
Bahan
Batu Belah m3 1.200 Rp. 157,500.00 Rp. 189,000.00
Pasir Urug m3 0.432 Rp. 155,700.00 Rp. 67,262.40

Jumlah Total Rp. 362,537.40


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 362,537.40
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 362,540.00

3 1 m³ Pasang Pondasi Rollag Bata Merah Camp. 1 PC : 3 Ps


Tenaga
Pekerja OH 2.400 Rp. 80,000.00 Rp. 192,000.00
Tukang Batu OH 0.800 Rp. 90,000.00 Rp. 72,000.00
Kepala Tukang OH 0.080 Rp. 100,000.00 Rp. 8,000.00
Mandor OH 0.120 Rp. 125,000.00 Rp. 15,000.00
Bahan
Bata Merah Bh 560.000 Rp. 700.00 Rp. 392,000.00
Semen Portland Kg 131.800 Rp. 1,500.00 Rp. 197,700.00
Pasir Pasang m3 0.364 Rp. 247,500.00 Rp. 90,090.00

Jumlah Total Rp. 966,790.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 966,790.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 966,790.00
Harga Satuan Pekerjaan Konstruksi 179

1 2 3 4 5 6

D Analisa Harga Satuan Pekerjaan Pasangan

1 1 m² Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 3 Ps


Tenaga
Pekerja OH 0.300 Rp. 80,000.00 Rp. 24,000.00
Tukang Batu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.015 Rp. 125,000.00 Rp. 1,875.00
Bahan
Bata Merah Bh 70.000 Rp. 700.00 Rp. 49,000.00
Semen Portland Kg 14.370 Rp. 1,500.00 Rp. 21,555.00
Pasir Pasang m3 0.040 Rp. 247,500.00 Rp. 9,900.00

Jumlah Total Rp. 116,330.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 116,330.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 116,330.00

2 1 m² Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 6 Ps


Tenaga
Pekerja OH 0.300 Rp. 80,000.00 Rp. 24,000.00
Tukang Batu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.015 Rp. 125,000.00 Rp. 1,875.00
Bahan
Bata Merah Bh 70.000 Rp. 700.00 Rp. 49,000.00
Semen Portland Kg 8.320 Rp. 1,500.00 Rp. 12,480.00
Pasir Pasang m3 0.049 Rp. 247,500.00 Rp. 12,127.50

Jumlah Total Rp. 109,482.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 109,482.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 109,480.00

E Analisa Harga Satuan Pekerjaan Plesteran


1 1 m² Pek. Plesteran Camp. 1 PC : 3 Ps Tbl. 15 mm
Tenaga
Pekerja OH 0.300 Rp. 80,000.00 Rp. 24,000.00
Tukang Batu OH 0.150 Rp. 90,000.00 Rp. 13,500.00
Kepala Tukang OH 0.015 Rp. 100,000.00 Rp. 1,500.00
Mandor OH 0.015 Rp. 125,000.00 Rp. 1,875.00
Bahan
Semen Portland Kg 7.776 Rp. 1,500.00 Rp. 11,664.00
Pasir Pasang m3 0.023 Rp. 247,500.00 Rp. 5,692.50

Jumlah Total Rp. 58,231.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 58,231.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 58,230.00
Harga Satuan Pekerjaan Konstruksi 180

1 2 3 4 5 6

2 1 m² Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm


Tenaga
Pekerja OH 0.300 Rp. 80,000.00 Rp. 24,000.00
Tukang Batu OH 0.150 Rp. 90,000.00 Rp. 13,500.00
Kepala Tukang OH 0.015 Rp. 100,000.00 Rp. 1,500.00
Mandor OH 0.015 Rp. 125,000.00 Rp. 1,875.00
Bahan
Semen Portland Kg 4.416 Rp. 1,500.00 Rp. 6,624.00
Pasir Pasang m3 0.027 Rp. 247,500.00 Rp. 6,682.50

Jumlah Total Rp. 54,181.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 54,181.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 54,180.00

3 1 m¹ Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps


Tenaga
Pekerja OH 0.080 Rp. 80,000.00 Rp. 6,400.00
Tukang Batu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.040 Rp. 100,000.00 Rp. 4,000.00
Mandor OH 0.004 Rp. 125,000.00 Rp. 500.00
Bahan
Semen Portland Kg 0.500 Rp. 1,500.00 Rp. 750.00
Pasir Pasang m3 0.013 Rp. 247,500.00 Rp. 3,217.50

Jumlah Total Rp. 23,867.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 23,867.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 23,870.00

4 1 m² Pek. Acian
Tenaga
Pekerja OH 0.200 Rp. 80,000.00 Rp. 16,000.00
Tukang Batu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.010 Rp. 125,000.00 Rp. 1,250.00
Bahan
Semen Portland Kg 3.250 Rp. 1,500.00 Rp. 4,875.00

Jumlah Total Rp. 32,125.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 32,125.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 32,130.00
Harga Satuan Pekerjaan Konstruksi 181

1 2 3 4 5 6

F Analisa Harga Satuan Pekerjaan Beton


1 1 m³ Pek. Beton Mutu f'c = 7,4 MPa (K.100) Slump (12 ± 2) Cm
Tenaga
Pekerja OH 1.650 Rp. 80,000.00 Rp. 132,000.00
Tukang Batu OH 0.275 Rp. 90,000.00 Rp. 24,750.00
Kepala Tukang OH 0.028 Rp. 100,000.00 Rp. 2,800.00
Mandor OH 0.083 Rp. 125,000.00 Rp. 10,375.00
Bahan
Semen Portland Kg 247.000 Rp. 1,500.00 Rp. 370,500.00
Pasir Beton m3 0.621 Rp. 247,500.00 Rp. 153,626.79
Koral Beton ( Maksimal 30 mm ) m3 0.740 Rp. 285,480.00 Rp. 211,255.20
Air Liter 215.000 Rp. 180.00 Rp. 38,700.00

Jumlah Total Rp. 944,006.99


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 944,006.99
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 944,010.00

2 1 m³ Pek. Beton Mutu f'c = 9,8 MPa (K.125) Slump (12 ± 2) Cm


Tenaga
Pekerja OH 1.650 Rp. 80,000.00 Rp. 132,000.00
Tukang Batu OH 0.275 Rp. 90,000.00 Rp. 24,750.00
Kepala Tukang OH 0.028 Rp. 100,000.00 Rp. 2,800.00
Mandor OH 0.083 Rp. 125,000.00 Rp. 10,375.00
Bahan
Semen Portland Kg 276.000 Rp. 1,500.00 Rp. 414,000.00
Pasir Beton m3 0.591 Rp. 247,500.00 Rp. 146,378.57
Koral Beton ( Maksimal 30 mm ) m3 0.750 Rp. 285,480.00 Rp. 214,004.27
Air Liter 215.000 Rp. 180.00 Rp. 38,700.00

Jumlah Total Rp. 983,007.84


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 983,007.84
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 983,010.00

3 1 m³ Pek. Beton Mutu f'c = 19,3 MPa (K.225) Slump (12 ± 2) Cm


Tenaga
Pekerja OH 1.650 Rp. 80,000.00 Rp. 132,000.00
Tukang Batu OH 0.275 Rp. 90,000.00 Rp. 24,750.00
Kepala Tukang OH 0.028 Rp. 100,000.00 Rp. 2,800.00
Mandor OH 0.083 Rp. 125,000.00 Rp. 10,375.00
Bahan
Semen Portland Kg 371.000 Rp. 1,500.00 Rp. 556,500.00
Pasir Beton m3 0.499 Rp. 247,500.00 Rp. 123,396.43
Koral Beton ( Maksimal 30 mm ) m3 0.776 Rp. 285,480.00 Rp. 221,405.60
Air Liter 215.000 Rp. 180.00 Rp. 38,700.00

Jumlah Total Rp. 1,109,927.03


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 1,109,927.03
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 1,109,930.00
Harga Satuan Pekerjaan Konstruksi 182

1 2 3 4 5 6

4 1 Kg Pek. Pembesian dengan Besi Beton Polos


Tenaga
Pekerja OH 0.0070 Rp. 80,000.00 Rp. 560.00
Tukang Besi OH 0.0070 Rp. 90,000.00 Rp. 630.00
Kepala Tukang OH 0.0007 Rp. 100,000.00 Rp. 70.00
Mandor OH 0.0004 Rp. 125,000.00 Rp. 50.00
Bahan
Besi Beton Polos Kg 1.050 Rp. 9,540.00 Rp. 10,017.00
Kawat Beton ( Bendrat ) Kg 0.015 Rp. 18,000.00 Rp. 270.00

Jumlah Total Rp. 11,597.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 11,597.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 11,600.00

5 1 Kg Pek. Pembesian dengan Besi Beton Ulir


Tenaga
Pekerja OH 0.0070 Rp. 80,000.00 Rp. 560.00
Tukang Besi OH 0.0070 Rp. 90,000.00 Rp. 630.00
Kepala Tukang OH 0.0007 Rp. 100,000.00 Rp. 70.00
Mandor OH 0.0004 Rp. 125,000.00 Rp. 50.00
Bahan
Besi Beton Ulir Kg 1.050 Rp. 9,990.00 Rp. 10,489.50
Kawat Beton ( Bendrat ) Kg 0.015 Rp. 18,000.00 Rp. 270.00

Jumlah Total Rp. 12,069.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 12,069.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 12,070.00

6 1 Kg Pek. Pembesian dengan Besi Wiremess


Tenaga
Pekerja OH 0.0025 Rp. 80,000.00 Rp. 200.00
Tukang Besi OH 0.0025 Rp. 90,000.00 Rp. 225.00
Kepala Tukang OH 0.0025 Rp. 100,000.00 Rp. 250.00
Mandor OH 0.0001 Rp. 125,000.00 Rp. 12.50
Bahan
Wiremess Kg 1.050 Rp. 9,450.00 Rp. 9,922.50
Kawat Beton ( Bendrat ) Kg 0.015 Rp. 18,000.00 Rp. 270.00

Jumlah Total Rp. 10,880.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 10,880.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 10,880.00

7 1 m² Pemasangan Begesting Untuk Pondasi


Tenaga
Pekerja OH 0.520 Rp. 80,000.00 Rp. 41,600.00
Tukang Kayu OH 0.260 Rp. 90,000.00 Rp. 23,400.00
Kepala Tukang OH 0.026 Rp. 100,000.00 Rp. 2,600.00
Mandor OH 0.026 Rp. 125,000.00 Rp. 3,250.00
Bahan
Kayu Begesting m3 0.040 Rp. 2,199,330.00 Rp. 87,973.20
Paku Kayu 5 - 10 Cm Kg 0.300 Rp. 12,240.00 Rp. 3,672.00
Minyak Begesting Liter 0.100 Rp. 10,800.00 Rp. 1,080.00

Jumlah Total Rp. 163,575.20


Overhead & Profit 10% (B) Rp. -
Harga Satuan Pekerjaan Konstruksi 183

1 2 3 4 5 6
Jumlah Keseluruhan (A + B) Rp. 163,575.20
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 163,580.00

8 1 m² Pemasangan Begesting Untuk Sloof


Tenaga
Pekerja OH 0.520 Rp. 80,000.00 Rp. 41,600.00
Tukang Kayu OH 0.260 Rp. 90,000.00 Rp. 23,400.00
Kepala Tukang OH 0.026 Rp. 100,000.00 Rp. 2,600.00
Mandor OH 0.026 Rp. 125,000.00 Rp. 3,250.00
Bahan
Kayu Begesting m3 0.045 Rp. 2,199,330.00 Rp. 98,969.85
Paku Kayu 5 - 10 Cm Kg 0.300 Rp. 12,240.00 Rp. 3,672.00
Minyak Begesting Liter 0.100 Rp. 10,800.00 Rp. 1,080.00

Jumlah Total Rp. 174,571.85


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 174,571.85
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 174,570.00

9 1 m² Pemasangan Begesting Untuk Kolom


Tenaga
Pekerja OH 0.660 Rp. 80,000.00 Rp. 52,800.00
Tukang Kayu OH 0.330 Rp. 90,000.00 Rp. 29,700.00
Kepala Tukang OH 0.033 Rp. 100,000.00 Rp. 3,300.00
Mandor OH 0.033 Rp. 125,000.00 Rp. 4,125.00
Bahan
Kayu Begesting m3 0.040 Rp. 2,199,330.00 Rp. 87,973.20
Paku Kayu 5 - 12 Cm Kg 0.400 Rp. 12,240.00 Rp. 4,896.00
Minyak Begesting Liter 0.200 Rp. 10,800.00 Rp. 2,160.00
Kayu Perencah m3 0.015 Rp. 4,010,580.00 Rp. 60,158.70
Plywood Tbl 9 mm Lbr 0.350 Rp. 103,500.00 Rp. 36,225.00
Kayu Dolken Ø 8 - 10 / 400 Cm Btg 2.000 Rp. 9,000.00 Rp. 18,000.00

Jumlah Total Rp. 299,337.90


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 299,337.90
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 299,340.00

10 1 m² Pemasangan Begesting Untuk Balok


Tenaga
Pekerja OH 0.660 Rp. 80,000.00 Rp. 52,800.00
Tukang Kayu OH 0.330 Rp. 90,000.00 Rp. 29,700.00
Kepala Tukang OH 0.033 Rp. 100,000.00 Rp. 3,300.00
Mandor OH 0.033 Rp. 125,000.00 Rp. 4,125.00
Bahan
Kayu Begesting m3 0.040 Rp. 2,199,330.00 Rp. 87,973.20
Paku Kayu 5 - 12 Cm Kg 0.400 Rp. 12,240.00 Rp. 4,896.00
Minyak Begesting Liter 0.200 Rp. 10,800.00 Rp. 2,160.00
Kayu Perencah m3 0.018 Rp. 4,010,580.00 Rp. 72,190.44
Plywood Tbl 9 mm Lbr 0.350 Rp. 103,500.00 Rp. 36,225.00
Kayu Dolken Ø 8 - 10 / 400 Cm Btg 2.000 Rp. 9,000.00 Rp. 18,000.00

Jumlah Total Rp. 311,369.64


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 311,369.64
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 311,370.00
Harga Satuan Pekerjaan Konstruksi 184

1 2 3 4 5 6

11 1 m² Pemasangan Begesting Untuk Plat


Tenaga
Pekerja OH 0.660 Rp. 80,000.00 Rp. 52,800.00
Tukang Kayu OH 0.330 Rp. 90,000.00 Rp. 29,700.00
Kepala Tukang OH 0.033 Rp. 100,000.00 Rp. 3,300.00
Mandor OH 0.033 Rp. 125,000.00 Rp. 4,125.00
Bahan
Kayu Begesting m3 0.040 Rp. 2,199,330.00 Rp. 87,973.20
Paku Kayu 5 - 12 Cm Kg 0.400 Rp. 12,240.00 Rp. 4,896.00
Minyak Begesting Liter 0.200 Rp. 10,800.00 Rp. 2,160.00
Kayu Perencah m3 0.015 Rp. 4,010,580.00 Rp. 60,158.70
Plywood Tbl 9 mm Lbr 0.350 Rp. 103,500.00 Rp. 36,225.00
Kayu Dolken Ø 8 - 10 / 400 Cm Btg 6.000 Rp. 9,000.00 Rp. 54,000.00

Jumlah Total Rp. 335,337.90


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 335,337.90
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 335,340.00

12 1 m² Pemasangan Begesting Untuk Tangga


Tenaga
Pekerja OH 0.660 Rp. 80,000.00 Rp. 52,800.00
Tukang Kayu OH 0.330 Rp. 90,000.00 Rp. 29,700.00
Kepala Tukang OH 0.033 Rp. 100,000.00 Rp. 3,300.00
Mandor OH 0.033 Rp. 125,000.00 Rp. 4,125.00
Bahan
Kayu Begesting m3 0.030 Rp. 2,199,330.00 Rp. 65,979.90
Paku Kayu 5 - 12 Cm Kg 0.400 Rp. 12,240.00 Rp. 4,896.00
Minyak Begesting Liter 0.200 Rp. 10,800.00 Rp. 2,160.00
Kayu Perencah m3 0.015 Rp. 4,010,580.00 Rp. 60,158.70
Plywood Tbl 9 mm Lbr 0.350 Rp. 103,500.00 Rp. 36,225.00
Kayu Dolken Ø 8 - 10 / 400 Cm Btg 2.000 Rp. 9,000.00 Rp. 18,000.00

Jumlah Total Rp. 277,344.60


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 277,344.60
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 277,340.00

G Analisa Harga Satuan Pekerjaan Kayu

1 1 m³ Pembuatan dan Pemasangan Kusen Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 6.000 Rp. 80,000.00 Rp. 480,000.00
Tukang Kayu OH 18.000 Rp. 90,000.00 Rp. 1,620,000.00
Kepala Tukang OH 1.800 Rp. 100,000.00 Rp. 180,000.00
Mandor OH 0.300 Rp. 125,000.00 Rp. 37,500.00
Bahan
Kayu Kamper/Bengkirai Balok m3 1.100 Rp. 9,000,000.00 Rp. 9,900,000.00
Paku Kayu 5 - 12 Cm Kg 1.250 Rp. 12,240.00 Rp. 15,300.00
Lem Kayu Kg 1.000 Rp. 11,880.00 Rp. 11,880.00

Jumlah Total Rp. 12,244,680.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 12,244,680.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 12,244,680.00
Harga Satuan Pekerjaan Konstruksi 185

1 2 3 4 5 6

2 1 m² Pembuatan dan Pemasangan Daun Pintu Panil Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 1.000 Rp. 80,000.00 Rp. 80,000.00
Tukang Kayu OH 3.000 Rp. 90,000.00 Rp. 270,000.00
Kepala Tukang OH 0.300 Rp. 100,000.00 Rp. 30,000.00
Mandor OH 0.050 Rp. 125,000.00 Rp. 6,250.00
Bahan
Kayu Kamper/Bengkirai Papan m3 0.040 Rp. 9,900,000.00 Rp. 396,000.00
Lem Kayu Kg 0.500 Rp. 11,880.00 Rp. 5,940.00

Jumlah Total Rp. 788,190.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 788,190.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 788,190.00

- 1 m² Pembuatan dan Pemasangan Slimar Pintu/Jendela Jati


Tenaga
Pekerja OH 0.800 Rp. 80,000.00 Rp. 64,000.00
Tukang Kayu OH 2.400 Rp. 90,000.00 Rp. 216,000.00
Kepala Tukang OH 0.240 Rp. 100,000.00 Rp. 24,000.00
Mandor OH 0.040 Rp. 125,000.00 Rp. 5,000.00
Bahan
Kayu kamper Papan m3 0.024 Rp. 12,150,000.00 Rp. 291,600.00
Lem Kayu Kg 0.300 Rp. 11,880.00 Rp. 3,564.00

Jumlah Total Rp. 604,164.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 604,164.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 604,160.00

- 1 m² Pembuatan dan Pemasangan Slimar Pintu/Jendela Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 0.800 Rp. 80,000.00 Rp. 64,000.00
Tukang Kayu OH 2.400 Rp. 90,000.00 Rp. 216,000.00
Kepala Tukang OH 0.240 Rp. 100,000.00 Rp. 24,000.00
Mandor OH 0.040 Rp. 125,000.00 Rp. 5,000.00
Bahan
Kayu Kamper/Bengkirai Papan m3 0.024 Rp. 9,900,000.00 Rp. 237,600.00
Lem Kayu Kg 0.300 Rp. 11,880.00 Rp. 3,564.00

Jumlah Total Rp. 550,164.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 550,164.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 550,160.00

- 1 m² Pemasangan Jalusi Kusen Kayu Jati


Tenaga
Pekerja OH 0.670 Rp. 80,000.00 Rp. 53,600.00
Tukang Kayu OH 2.000 Rp. 90,000.00 Rp. 180,000.00
Kepala Tukang OH 0.200 Rp. 100,000.00 Rp. 20,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu kamper Papan m3 0.060 Rp. 12,150,000.00 Rp. 729,000.00
Paku Kayu Kg 0.300 Rp. 12,240.00 Rp. 3,672.00

Jumlah Total Rp. 1,028,147.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 1,028,147.00
Harga Satuan Pekerjaan Konstruksi 186

1 2 3 4 5 6
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 1,028,150.00

- 1 m² Pemasangan Jalusi Kusen Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 0.670 Rp. 80,000.00 Rp. 53,600.00
Tukang Kayu OH 2.000 Rp. 90,000.00 Rp. 180,000.00
Kepala Tukang OH 0.200 Rp. 100,000.00 Rp. 20,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu Kamper/Bengkirai Papan m3 0.060 Rp. 9,900,000.00 Rp. 594,000.00
Paku Kayu Kg 0.300 Rp. 12,240.00 Rp. 3,672.00

Jumlah Total Rp. 893,147.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 893,147.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 893,150.00

- 1 m³ Pasang Kuda - Kuda Konvensional Kayu Jati


Tenaga
Pekerja OH 4.000 Rp. 80,000.00 Rp. 320,000.00
Tukang Kayu OH 12.000 Rp. 90,000.00 Rp. 1,080,000.00
Kepala Tukang OH 1.200 Rp. 100,000.00 Rp. 120,000.00
Mandor OH 0.200 Rp. 125,000.00 Rp. 25,000.00
Bahan
Kayu kamper Balok m3 1.100 Rp. 12,150,000.00 Rp. 13,365,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 5.600 Rp. 12,240.00 Rp. 68,544.00

Jumlah Total Rp. 15,181,044.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 15,181,044.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 15,181,040.00

- 1 m³ Pasang Kuda - Kuda Konvensional Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 4.000 Rp. 80,000.00 Rp. 320,000.00
Tukang Kayu OH 12.000 Rp. 90,000.00 Rp. 1,080,000.00
Kepala Tukang OH 1.200 Rp. 100,000.00 Rp. 120,000.00
Mandor OH 0.200 Rp. 125,000.00 Rp. 25,000.00
Bahan
Kayu Kamper/Bengirai Balok m3 1.100 Rp. 9,900,000.00 Rp. 10,890,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 5.600 Rp. 12,240.00 Rp. 68,544.00

Jumlah Total Rp. 12,706,044.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 12,706,044.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 12,706,040.00

- 1 m³ Pasang Kuda - Kuda Ekspose Kayu Jati


Tenaga
Pekerja OH 6.700 Rp. 80,000.00 Rp. 536,000.00
Tukang Kayu OH 20.100 Rp. 90,000.00 Rp. 1,809,000.00
Kepala Tukang OH 2.010 Rp. 100,000.00 Rp. 201,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu kamper Balok m3 1.200 Rp. 12,150,000.00 Rp. 14,580,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 5.600 Rp. 12,240.00 Rp. 68,544.00
Harga Satuan Pekerjaan Konstruksi 187

1 2 3 4 5 6

Jumlah Total Rp. 17,438,919.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 17,438,919.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 17,438,920.00

- 1 m³ Pasang Kuda - Kuda Ekspose Kayu Kamper/Bengkirai


Tenaga
Pekerja OH 6.700 Rp. 80,000.00 Rp. 536,000.00
Tukang Kayu OH 20.100 Rp. 90,000.00 Rp. 1,809,000.00
Kepala Tukang OH 2.010 Rp. 100,000.00 Rp. 201,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu Kamper/Bengirai Balok m3 1.200 Rp. 9,900,000.00 Rp. 11,880,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 5.600 Rp. 12,240.00 Rp. 68,544.00

Jumlah Total Rp. 14,738,919.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 14,738,919.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 14,738,920.00

- 1 m³ Pasang Gording, Nok, Jurai Kayu Jati


Tenaga
Pekerja OH 6.700 Rp. 80,000.00 Rp. 536,000.00
Tukang Kayu OH 20.100 Rp. 90,000.00 Rp. 1,809,000.00
Kepala Tukang OH 2.010 Rp. 100,000.00 Rp. 201,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu kamper Balok m3 1.100 Rp. 12,150,000.00 Rp. 13,365,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 3.000 Rp. 12,240.00 Rp. 36,720.00

Jumlah Total Rp. 16,192,095.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 16,192,095.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 16,192,100.00

- 1 m³ Pasang Gording, Nok, Jurai Kayu Kamper / Bengkirai


Tenaga
Pekerja OH 6.700 Rp. 80,000.00 Rp. 536,000.00
Tukang Kayu OH 20.100 Rp. 90,000.00 Rp. 1,809,000.00
Kepala Tukang OH 2.010 Rp. 100,000.00 Rp. 201,000.00
Mandor OH 0.335 Rp. 125,000.00 Rp. 41,875.00
Bahan
Kayu Kamper/Bengirai Balok m3 1.100 Rp. 9,900,000.00 Rp. 10,890,000.00
Besi Strip Kg 15.000 Rp. 13,500.00 Rp. 202,500.00
Paku Kayu 12 Cm Kg 3.000 Rp. 12,240.00 Rp. 36,720.00

Jumlah Total Rp. 13,717,095.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 13,717,095.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 13,717,100.00

- 1 m² Pasang Usuk Kayu Jati Uk. 4/6


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Harga Satuan Pekerjaan Konstruksi 188

1 2 3 4 5 6
Mandor OH 0.003 Rp. 125,000.00 Rp. 312.50
Bahan
Kayu kamper Kaso m3 0.010 Rp. 9,000,000.00 Rp. 86,400.00
Paku Kayu Kg 0.125 Rp. 12,240.00 Rp. 1,530.00

Jumlah Total Rp. 97,242.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 97,242.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 97,240.00

- 1 m² Pasang Usuk Kayu Jati Uk. 5/7


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 312.50
Bahan
Kayu kamper Kaso m3 0.011 Rp. 9,000,000.00 Rp. 94,500.00
Paku Kayu Kg 0.125 Rp. 12,240.00 Rp. 1,530.00

Jumlah Total Rp. 105,342.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 105,342.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 105,340.00

- 1 m² Pasang Usuk Kayu Kamper/Bengkirai Uk. 4/6


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 312.50
Bahan
Kayu Kamper/Bengkirai Kaso m3 0.010 Rp. 8,100,000.00 Rp. 77,760.00
Paku Kayu Kg 0.125 Rp. 12,240.00 Rp. 1,530.00

Jumlah Total Rp. 88,602.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 88,602.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 88,600.00

- 1 m² Pasang Usuk Kayu Kamper/Bengkirai Uk. 5/7


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 312.50
Bahan
Kayu kamper Kaso m3 0.011 Rp. 8,100,000.00 Rp. 85,050.00
Paku Kayu Kg 0.125 Rp. 12,240.00 Rp. 1,530.00

Jumlah Total Rp. 95,892.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 95,892.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 95,890.00

- 1 m² Pasang Reng Kayu Jati


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Harga Satuan Pekerjaan Konstruksi 189

1 2 3 4 5 6
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 312.50
Bahan
Reng Kayu kamper m3 0.004 Rp. 6,300,000.00 Rp. 25,200.00
Paku Kayu Kg 0.125 Rp. 12,240.00 Rp. 1,530.00

Jumlah Total Rp. 36,042.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 36,042.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 36,040.00

- 1 m¹ Pasang Lisplank Kayu Jati Uk. 3/20


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Kayu kamper Papan m3 0.0108 Rp. 12,150,000.00 Rp. 131,220.00
Paku Kayu Kg 0.100 Rp. 12,240.00 Rp. 1,224.00

Jumlah Total Rp. 161,069.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 161,069.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 161,070.00

- 1 m¹ Pasang Lisplank Kayu Kamper Uk. 3/20


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Kayu Kamper/Bengkirai Papan m3 0.0108 Rp. 9,900,000.00 Rp. 106,920.00
Paku Kayu Kg 0.100 Rp. 12,240.00 Rp. 1,224.00

Jumlah Total Rp. 136,769.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 136,769.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 136,770.00

- 1 m¹ Pasang Lisplank Kayu Jati Uk. 3/30


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Kayu kamper Papan m3 0.011 Rp. 12,150,000.00 Rp. 133,650.00
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 162,887.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 162,887.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 162,890.00

- 1 m¹ Pasang Lisplank Kayu Kamper Uk. 3/30


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Harga Satuan Pekerjaan Konstruksi 190

1 2 3 4 5 6
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Kayu Kamper/Bengkirai Papan m3 0.011 Rp. 9,900,000.00 Rp. 108,900.00
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 138,137.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 138,137.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 138,140.00

- 1 m¹ Pasang Lisplank GRC Lebar 20 Cm


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Lisplank GRC 0,9/20 Cm m1 1.050 Rp. 15,300.00 Rp. 16,065.00
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 45,302.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 45,302.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 45,300.00

3 1 m¹ Pasang Lisplank GRC Lebar 30 Cm


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Lisplank GRC 0,9/30 Cm m1 1.050 Rp. 18,090.00 Rp. 18,994.50
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 48,231.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 48,231.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 48,230.00

- 1 m² Pasang Rangka Plafond Kayu Jati


Tenaga
Pekerja OH 0.150 Rp. 80,000.00 Rp. 12,000.00
Tukang Kayu OH 0.300 Rp. 90,000.00 Rp. 27,000.00
Kepala Tukang OH 0.030 Rp. 100,000.00 Rp. 3,000.00
Mandor OH 0.075 Rp. 125,000.00 Rp. 9,375.00
Bahan
Kayu kamper Kaso m3 0.0154 Rp. 9,000,000.00 Rp. 138,600.00
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 190,587.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 190,587.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 190,590.00

- 1 m² Pasang Rangka Plafond Kayu Kamper/Bengkirai


Tenaga
Harga Satuan Pekerjaan Konstruksi 191

1 2 3 4 5 6
Pekerja OH 0.150 Rp. 80,000.00 Rp. 12,000.00
Tukang Kayu OH 0.300 Rp. 90,000.00 Rp. 27,000.00
Kepala Tukang OH 0.030 Rp. 100,000.00 Rp. 3,000.00
Mandor OH 0.075 Rp. 125,000.00 Rp. 9,375.00
Bahan
Kayu Kamper/Bengkirai Kaso m3 0.0154 Rp. 9,000,000.00 Rp. 138,600.00
Paku Kayu Kg 0.050 Rp. 12,240.00 Rp. 612.00

Jumlah Total Rp. 190,587.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 190,587.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 190,590.00

H Analisa Harga Satuan Pekerjaan Kunci dan Kaca

1 1 Bh Pasang Kunci Tanam 2X Putar


Tenaga
Tukang Kayu OH 0.250 Rp. 90,000.00 Rp. 22,500.00
Kepala Tukang OH 0.025 Rp. 100,000.00 Rp. 2,500.00
Bahan
Kunci Tanam 2X Putar Bh 1.000 Rp. 99,000.00 Rp. 99,000.00

Jumlah Total Rp. 124,000.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 124,000.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 124,000.00

2 1 Bh Pasang Kunci Pintu Floorhing


Tenaga
Tukang Aluminium OH 0.250 Rp. 90,000.00 Rp. 22,500.00
Kepala Tukang OH 0.025 Rp. 100,000.00 Rp. 2,500.00
Bahan
Kunci Pintu Floorhing Set 1.000 Rp. 675,000.00 Rp. 675,000.00

Jumlah Total Rp. 700,000.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 700,000.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 700,000.00

3 1 Bh Pasang Kunci Pintu Geser / Sliding


Tenaga
Tukang Kayu OH 0.250 Rp. 90,000.00 Rp. 22,500.00
Kepala Tukang OH 0.025 Rp. 100,000.00 Rp. 2,500.00
Bahan
Kunci Pintu Geser / Sliding Bh 1.000 Rp. 121,500.00 Rp. 121,500.00

Jumlah Total Rp. 146,500.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 146,500.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 146,500.00

4 1 Bh Pasang Engsel Pintu Type Ball Bearing


Tenaga
Tukang Kayu OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Bahan
Engsel Pintu Type Ball Bearing Bh 1.000 Rp. 19,800.00 Rp. 19,800.00

Jumlah Total Rp. 32,350.00


Harga Satuan Pekerjaan Konstruksi 192

1 2 3 4 5 6
Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 32,350.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 32,350.00
Harga Satuan Pekerjaan Konstruksi 193

1 2 3 4 5 6

5 1 Set Pasang Engsel Pintu Floorhing


Tenaga
Tukang Aluminium OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Bahan
Engsel Pintu Floorhing Set 1.000 Rp. 1,800,000.00 Rp. 1,800,000.00

Jumlah Total Rp. 1,812,550.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 1,812,550.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 1,812,550.00

6 1 Bh Pasang Engsel Jendela Type Casement 12"


Tenaga
Tukang Aluminium OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Bahan
Engsel Jendela Type Casement Bh 1.000 Rp. 67,500.00 Rp. 67,500.00

Jumlah Total Rp. 80,050.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 80,050.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 80,050.00

6 1 Bh Pasang Engsel Angin


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Engsel Angin Bh 1.000 Rp. 12,600.00 Rp. 12,600.00

Jumlah Total Rp. 22,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 22,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 22,600.00

7 1 Bh Pasang Kait Angin


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Kait Angin Bh 1.000 Rp. 13,500.00 Rp. 13,500.00

Jumlah Total Rp. 23,500.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 23,500.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 23,500.00

8 1 Bh Pasang Lever Handel Pintu


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Lever Handel Pintu Bh 1.000 Rp. 27,000.00 Rp. 27,000.00

Jumlah Total Rp. 37,000.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 37,000.00
Harga Satuan Pekerjaan Konstruksi 194

1 2 3 4 5 6
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 37,000.00

9 1 Bh Pasang Pull Handel Pintu


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Pull Handel Pintu Bh 1.000 Rp. 225,000.00 Rp. 225,000.00

Jumlah Total Rp. 235,000.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 235,000.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 235,000.00

10 1 Bh Pasang Kunci Slot / Grendel Pintu


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Kunci Slot / Grendel Pintu Bh 1.000 Rp. 14,400.00 Rp. 14,400.00

Jumlah Total Rp. 24,400.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 24,400.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 24,400.00

11 1 Bh Pasang Kunci Slot / Grendel Jendela


Tenaga
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Bahan
Kunci Slot / Grendel Jendela Bh 1.000 Rp. 6,660.00 Rp. 6,660.00

Jumlah Total Rp. 16,660.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 16,660.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 16,660.00

12 1 m² Pasang Kaca Bening Tbl 6 mm


Tenaga
Pekerja OH 0.015 Rp. 80,000.00 Rp. 1,200.00
Tukang Kayu OH 0.150 Rp. 90,000.00 Rp. 13,500.00
Kepala Tukang OH 0.015 Rp. 100,000.00 Rp. 1,500.00
Mandor OH 0.0008 Rp. 125,000.00 Rp. 100.00
Bahan
Kaca Bening Tbl 5 mm m2 1.100 Rp. 142,200.00 Rp. 156,420.00
Sealant Kg 0.050 Rp. 189,000.00 Rp. 9,450.00

Jumlah Total Rp. 182,170.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 182,170.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 182,170.00
Harga Satuan Pekerjaan Konstruksi 195

1 2 3 4 5 6

24 1 m² Pasang Kaca bening +5 mm Laminated Tempered


Tenaga
Pekerja OH 0.015 Rp. 80,000.00 Rp. 1,200.00
Tukang Kayu OH 0.150 Rp. 90,000.00 Rp. 13,500.00
Kepala Tukang OH 0.015 Rp. 100,000.00 Rp. 1,500.00
Mandor OH 0.0008 Rp. 125,000.00 Rp. 100.00
Bahan
Kaca bening +5 mm Laminated Tempered m2 1.100 Rp. 742,500.00 Rp. 816,750.00
Sealant Kg 0.050 Rp. 189,000.00 Rp. 9,450.00

Jumlah Total Rp. 842,500.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 842,500.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 842,500.00

13 1 m² Pasang Kaca Tempered 10 mm


Tenaga
Pekerja OH 0.015 Rp. 80,000.00 Rp. 1,200.00
Tukang Kayu OH 0.150 Rp. 90,000.00 Rp. 13,500.00
Kepala Tukang OH 0.015 Rp. 100,000.00 Rp. 1,500.00
Mandor OH 0.0008 Rp. 125,000.00 Rp. 100.00
Bahan
Kaca Tempered Tbl. 10 mm m2 1.100 Rp. 694,800.00 Rp. 764,280.00
Sealant Kg 0.050 Rp. 189,000.00 Rp. 9,450.00

Jumlah Total Rp. 790,030.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 790,030.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 790,030.00

14 1 m² Pasang Kaca Tempered 12 mm


Tenaga
Pekerja OH 0.025 Rp. 80,000.00 Rp. 2,000.00
Tukang Kayu OH 0.250 Rp. 90,000.00 Rp. 22,500.00
Kepala Tukang OH 0.025 Rp. 100,000.00 Rp. 2,500.00
Mandor OH 0.0013 Rp. 125,000.00 Rp. 162.50
Bahan
Kaca Tempered Tbl. 12 mm m2 1.100 Rp. 694,800.00 Rp. 764,280.00
Sealant Kg 0.050 Rp. 189,000.00 Rp. 9,450.00

Jumlah Total Rp. 800,892.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 800,892.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 800,890.00
Harga Satuan Pekerjaan Konstruksi 196

1 2 3 4 5 6

H Analisa Harga Satuan Pekerjaan Penutup Atap

1 1 m² Pasang Genteng Beton


Tenaga
Pekerja OH 0.200 Rp. 80,000.00 Rp. 16,000.00
Tukang Kayu OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.010 Rp. 125,000.00 Rp. 1,250.00
Bahan
Genteng Beton Bh 16.000 Rp. 5,400.00 Rp. 86,400.00

Jumlah Total Rp. 113,650.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 113,650.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 113,650.00

2 1 m¹ Pasang Bubungan Genteng Beton


Tenaga
Pekerja OH 0.400 Rp. 80,000.00 Rp. 32,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.002 Rp. 125,000.00 Rp. 250.00
Bahan
Bubungan Genteng Beton Bh 3.500 Rp. 9,000.00 Rp. 31,500.00
Paku 2" - 5" Kg 0.050 Rp. 12,240.00 Rp. 612.00
Semen Portland Kg 10.800 Rp. 1,500.00 Rp. 16,200.00
Pasir Pasang m3 0.032 Rp. 247,500.00 Rp. 7,920.00

Jumlah Total Rp. 108,482.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 108,482.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 108,480.00
I Analisa Harga Satuan Pekerjaan Langit - Langit

1 1 m² Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm


Tenaga
Pekerja OH 0.800 Rp. 80,000.00 Rp. 64,000.00
Tukang Kayu OH 0.800 Rp. 90,000.00 Rp. 72,000.00
Kepala Tukang OH 0.080 Rp. 100,000.00 Rp. 8,000.00
Mandor OH 0.040 Rp. 125,000.00 Rp. 5,000.00
Bahan
Kayu kamper Papan m3 0.015 Rp. 12,150,000.00 Rp. 182,250.00
Paku Kayu Kg 0.010 Rp. 12,240.00 Rp. 122.40

Jumlah Total Rp. 331,372.40


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 331,372.40
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 331,370.00

2 1 m² Pasang Gypsumboard Uk. 120 x 240


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Gypsum Board Lbr 0.364 Rp. 56,520.00 Rp. 20,573.28
Paku Kalsiboard Kg 0.110 Rp. 27,000.00 Rp. 2,970.00
Harga Satuan Pekerjaan Konstruksi 197

1 2 3 4 5 6

Jumlah Total Rp. 37,168.28


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 37,168.28
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 37,170.00
Harga Satuan Pekerjaan Konstruksi 198

1 2 3 4 5 6

3 1 m¹ Pasang List Plafond Gypsum


Tenaga
Pekerja OH 0.050 Rp. 80,000.00 Rp. 4,000.00
Tukang Kayu OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 375.00
Bahan
List Plafond Gypsum m1 1.050 Rp. 18,000.00 Rp. 18,900.00
Tepung Gypsum Kg 0.010 Rp. 2,700.00 Rp. 27.00

Jumlah Total Rp. 28,302.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 28,302.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 28,300.00

J Analisa Harga Satuan Pekerjaan Lantai dan Pelapis Dinding

1 1 m² Pasang Lantai Keramik Uk. 30 x 30 (Teksture)


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Batu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Keramik Lantai Uk. 30 x 30 (Teksture) m2 1.068 Rp. 63,000.00 Rp. 67,302.90
Semen Portland Kg 10.000 Rp. 1,500.00 Rp. 15,000.00
Pasir Pasang m3 0.045 Rp. 247,500.00 Rp. 11,137.50
Semen Nat Kg 1.500 Rp. 9,000.00 Rp. 13,500.00

Jumlah Total Rp. 202,315.40


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 202,315.40
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 202,320.00

2 1 m² Pasang Lantai Keramik Uk. 10 x 10


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Batu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Keramik Lantai Uk. 40 x 40 (Polos) m2 1.068 Rp. 42,480.00 Rp. 45,381.38
Semen Portland Kg 10.000 Rp. 1,500.00 Rp. 15,000.00
Pasir Pasang m3 0.045 Rp. 247,500.00 Rp. 11,137.50
Semen Nat Kg 1.500 Rp. 9,000.00 Rp. 13,500.00
Harga Satuan Pekerjaan Konstruksi 199

1 2 3 4 5 6
Jumlah Total Rp. 180,393.88
Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 180,393.88

- 1 m² Pasang Lantai Keramik Uk. 10 x 10


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Batu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Keramik Lantai Uk.10 x10 m2 1.068 Rp. 54,000.00 Rp. 57,688.20
Semen Portland Kg 10.000 Rp. 1,500.00 Rp. 15,000.00
Pasir Pasang m3 0.045 Rp. 247,500.00 Rp. 11,137.50
Semen Nat Kg 1.500 Rp. 9,000.00 Rp. 13,500.00

Jumlah Total Rp. 192,700.70


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 192,700.70
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 192,700.00

3 1 m² Pasang Lantai Keramik Uk. 50 x 50 (Polos)


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Batu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Keramik Lantai Uk. 50 x 50 m2 1.068 Rp. 56,250.00 Rp. 60,091.88
Semen Portland Kg 10.000 Rp. 1,500.00 Rp. 15,000.00
Pasir Pasang m3 0.045 Rp. 247,500.00 Rp. 11,137.50
Semen Nat Kg 1.500 Rp. 9,000.00 Rp. 13,500.00

Jumlah Total Rp. 195,104.38


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 195,104.38
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 195,100.00

4 1 m² Pasang Granit Tile Warna Gelap


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Tukang Batu OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Mandor OH 0.013 Rp. 125,000.00 Rp. 1,625.00
Bahan
Granit Tile Warna Gelap m2 1.061 Rp. 233,640.00 Rp. 247,845.31
Semen Portland Kg 9.800 Rp. 1,500.00 Rp. 14,700.00
Pasir Pasang m3 0.045 Rp. 247,500.00 Rp. 11,137.50
Semen Nat Kg 1.300 Rp. 9,000.00 Rp. 11,700.00

Jumlah Total Rp. 319,557.81


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 319,557.81
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 319,560.00
Harga Satuan Pekerjaan Konstruksi 200

1 2 3 4 5 6

5 1 m² Pasang Dinding Marmer


Tenaga
Pekerja OH 1.300 Rp. 80,000.00 Rp. 104,000.00
Tukang Batu OH 0.650 Rp. 90,000.00 Rp. 58,500.00
Kepala Tukang OH 0.065 Rp. 100,000.00 Rp. 6,500.00
Mandor OH 0.065 Rp. 125,000.00 Rp. 8,125.00
Bahan
Marmer m2 1.060 Rp. 155,925.00 Rp. 165,280.50
Semen Portland Kg 12.440 Rp. 1,500.00 Rp. 18,660.00
Pasir Pasang m3 0.025 Rp. 247,500.00 Rp. 6,187.50
Semen Nat Kg 0.650 Rp. 9,000.00 Rp. 5,850.00

Jumlah Total Rp. 373,103.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 373,103.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 373,100.00

6 1 m² Pasang Keramik Dinding Uk. 30 x 60


Tenaga
Pekerja OH 0.900 Rp. 80,000.00 Rp. 72,000.00
Tukang Batu OH 0.450 Rp. 90,000.00 Rp. 40,500.00
Kepala Tukang OH 0.045 Rp. 100,000.00 Rp. 4,500.00
Mandor OH 0.045 Rp. 125,000.00 Rp. 5,625.00
Bahan
Keramik Dinding Uk. 30 x 60 m2 1.060 Rp. 81,000.00 Rp. 85,860.00
Semen Portland Kg 9.300 Rp. 1,500.00 Rp. 13,950.00
Pasir Pasang m3 0.018 Rp. 247,500.00 Rp. 4,455.00
Semen Nat Kg 1.940 Rp. 9,000.00 Rp. 17,460.00

Jumlah Total Rp. 244,350.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 244,350.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 244,350.00

7 1 m² Pasang Batu Andesit


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Kayu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Batu Andesit m2 1.100 Rp. 117,000.00 Rp. 128,700.00
Semen Portland Kg 11.750 Rp. 1,500.00 Rp. 17,625.00
Pasir Pasang m3 0.0350 Rp. 247,500.00 Rp. 8,662.50

Jumlah Total Rp. 250,362.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 250,362.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 250,360.00
Harga Satuan Pekerjaan Konstruksi 201

1 2 3 4 5 6

8 1 m² Pasang Batu Ampyangan ( Koral Sikat )


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Kayu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
batu Koral Sikat Kg 16.667 Rp. 2,700.00 Rp. 45,000.90
Semen Portland Kg 11.750 Rp. 1,500.00 Rp. 17,625.00
Pasir Pasang m3 0.0350 Rp. 247,500.00 Rp. 8,662.50

Jumlah Total Rp. 166,663.40


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 166,663.40
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 166,660.00

9 1 m² Pasang Batu Palimanan


Tenaga
Pekerja OH 0.700 Rp. 80,000.00 Rp. 56,000.00
Tukang Kayu OH 0.350 Rp. 90,000.00 Rp. 31,500.00
Kepala Tukang OH 0.035 Rp. 100,000.00 Rp. 3,500.00
Mandor OH 0.035 Rp. 125,000.00 Rp. 4,375.00
Bahan
Batu Palimanan m2 1.100 Rp. 135,000.00 Rp. 148,500.00
Semen Portland Kg 11.750 Rp. 1,500.00 Rp. 17,625.00
Pasir Pasang m3 0.0350 Rp. 247,500.00 Rp. 8,662.50

Jumlah Total Rp. 270,162.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 270,162.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 270,160.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 200,860.00

10 1 m² Pas. Lantai Parquet jati


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Tukang Batu OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Mandor OH 0.013 Rp. 125,000.00 Rp. 1,625.00
Bahan
Kayu Parquet jati m2 1.061 Rp. 225,000.00 Rp. 238,680.00
Lem Vinil Kg 1.300 Rp. 54,000.00 Rp. 70,200.00

Jumlah Total Rp. 343,055.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 343,055.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 343,060.00
Harga Satuan Pekerjaan Konstruksi 202

1 2 3 4 5 6

11 1 m² Pas.wood Composit Panel


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Tukang Batu OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Mandor OH 0.013 Rp. 125,000.00 Rp. 1,625.00
Bahan
Wood Composit Panel m2 1.061 Rp. 83,250.00 Rp. 88,311.60
Lem Vinil Kg 1.300 Rp. 54,000.00 Rp. 70,200.00

Jumlah Total Rp. 192,686.60


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 192,686.60
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 192,690.00

12 1 m² Pas.Kayu Jati Fin Melamik


Tenaga
Pekerja OH 0.250 Rp. 80,000.00 Rp. 20,000.00
Tukang Batu OH 0.125 Rp. 90,000.00 Rp. 11,250.00
Kepala Tukang OH 0.013 Rp. 100,000.00 Rp. 1,300.00
Mandor OH 0.013 Rp. 125,000.00 Rp. 1,625.00
Bahan
kayu Jati Fin Melamik m2 1.061 Rp. 202,500.00 Rp. 214,812.00
Lem Vinil Kg 1.300 Rp. 54,000.00 Rp. 70,200.00

Jumlah Total Rp. 319,187.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 319,187.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 319,190.00
K Analisa Harga Satuan Pekerjaan Besi/Aluminium
1 1 Kg Pemasangan Besi Baja Profil
Tenaga
Pekerja OH 0.060 Rp. 80,000.00 Rp. 4,800.00
Tukang Las Konstruksi OH 0.060 Rp. 90,000.00 Rp. 5,400.00
Kepala Tukang OH 0.006 Rp. 100,000.00 Rp. 600.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 375.00
Bahan
Besi Baja Profil Kg 1.050 Rp. 12,500.00 Rp. 13,125.00

Jumlah Total Rp. 24,300.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 24,300.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 24,300.00
Harga Satuan Pekerjaan Konstruksi 203

1 2 3 4 5 6

2 1 m² Pemasangan Reng Usuk Galvalume System


Tenaga
Pekerja OH 0.124 Rp. 80,000.00 Rp. 9,880.00
Tukang Galvalume OH 0.088 Rp. 90,000.00 Rp. 7,920.00
Kepala Tukang OH 0.055 Rp. 100,000.00 Rp. 5,500.00
Mandor OH 0.055 Rp. 125,000.00 Rp. 6,875.00
Bahan
Trust/Kaso Zincalume / Baja Ringan m1 1.620 Rp. 18,000.00 Rp. 29,160.00
Reng Zincalume / Baja Ringan m1 4.681 Rp. 6,750.00 Rp. 31,596.75
Srew 12-14x20 Bh 5.000 Rp. 360.00 Rp. 1,800.00
Srew 12-14x16 Bh 10.000 Rp. 360.00 Rp. 3,600.00

Jumlah Total Rp. 96,331.75


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 96,331.75
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 96,330.00

3 1 m² Pemasangan Rangka Plafond Hollow Zincromate


Tenaga
Pekerja OH 0.100 Rp. 80,000.00 Rp. 8,000.00
Tukang Galvalume OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.005 Rp. 125,000.00 Rp. 625.00
Bahan
Besi Hollow Plafond Zincromate Uk. 2/4 x 400 Btg 1.025 Rp. 22,500.00 Rp. 23,062.50
Besi Hollow Plafond Zincromate Uk. 4/4 x 400 Btg 0.513 Rp. 36,000.00 Rp. 18,450.00
Ramset / Dina bolt Bh 4.000 Rp. 7,200.00 Rp. 28,800.00
Srew 12-14x20 Bh 4.000 Rp. 360.00 Rp. 1,440.00

Jumlah Total Rp. 89,877.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 89,877.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 89,880.00

4 1 m² Pasang Aluminium Composite Panel ( ACP )


Tenaga
Pekerja OH 0.200 Rp. 80,000.00 Rp. 16,000.00
Tukang Aluminium/Galvalume OH 0.100 Rp. 90,000.00 Rp. 9,000.00
Kepala Tukang OH 0.010 Rp. 100,000.00 Rp. 1,000.00
Mandor OH 0.001 Rp. 125,000.00 Rp. 125.00
Bahan
Aluminium Composite Panel ( ACP ) m2 1.100 Rp. 585,000.00 Rp. 643,500.00
Srew 12-14x16 Bh 20.000 Rp. 360.00 Rp. 7,200.00
Besi Siku 30*30*3 Kg 12.400 Rp. 12,500.00 Rp. 155,000.00

Jumlah Total Rp. 831,825.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 831,825.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 831,830.00
Harga Satuan Pekerjaan Konstruksi 204

1 2 3 4 5 6

- 1 m¹ Pasang Talang Seng BJLS 30 Lebar 90 Cm


Tenaga
Pekerja OH 0.200 Rp. 80,000.00 Rp. 16,000.00
Tukang Kayu OH 0.200 Rp. 90,000.00 Rp. 18,000.00
Kepala Tukang OH 0.020 Rp. 100,000.00 Rp. 2,000.00
Mandor OH 0.001 Rp. 125,000.00 Rp. 125.00
Bahan
Seng Plat Datar m2 1.050 Rp. 36,000.00 Rp. 37,800.00
Paku 1 Cm - 2,5 Cm Kg 0.015 Rp. 12,240.00 Rp. 183.60
Kayu Papan m3 0.019 Rp. 7,200,000.00 Rp. 136,800.00

Jumlah Total Rp. 210,908.60


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 210,908.60
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 210,910.00

L Analisa Harga Satuan Pekerjaan Pengecatan

1 1 m² Pek. Plamir Dinding


Tenaga
Pekerja OH 0.020 Rp. 80,000.00 Rp. 1,600.00
Tukang Cat OH 0.030 Rp. 90,000.00 Rp. 2,700.00
Kepala Tukang OH 0.003 Rp. 100,000.00 Rp. 300.00
Mandor OH 0.001 Rp. 125,000.00 Rp. 125.00
Bahan
Plamir Tembok kg 0.100 Rp 11,250.00 Rp. 1,125.00
Amplas Lbr 0.500 Rp 2,700.00 Rp. 1,350.00

Jumlah Total Rp. 7,200.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 7,200.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 7,200.00

2 1 m² Pek. Pengecatan Dasar Dengan Alkali Shealer


Tenaga
Pekerja OH 0.060 Rp. 80,000.00 Rp. 4,800.00
Tukang Cat OH 0.050 Rp. 90,000.00 Rp. 4,500.00
Kepala Tukang OH 0.005 Rp. 100,000.00 Rp. 500.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 375.00
Bahan
Alkali Shealer kg 0.240 Rp 45,000.00 Rp. 10,800.00

Jumlah Total Rp. 20,975.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 20,975.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 20,980.00
Harga Satuan Pekerjaan Konstruksi 205

1 2 3 4 5 6

3 1 m² Pengecatan Dinding Emultion 2 Lapis Dengan Roll


Tenaga
Pekerja OH 0.040 Rp. 80,000.00 Rp. 3,200.00
Tukang Cat OH 0.030 Rp. 90,000.00 Rp. 2,700.00
Kepala Tukang OH 0.003 Rp. 100,000.00 Rp. 300.00
Mandor OH 0.002 Rp. 125,000.00 Rp. 250.00
Bahan
Cat Tembok Emultion Kg 0.470 Rp 22,500.00 Rp. 10,575.00

Jumlah Total Rp. 17,025.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 17,025.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 17,030.00

4 1 m² Pengecatan Dinding Watersheald 2 Lapis Dengan Roll


Tenaga
Pekerja OH 0.040 Rp. 80,000.00 Rp. 3,200.00
Tukang Cat OH 0.030 Rp. 90,000.00 Rp. 2,700.00
Kepala Tukang OH 0.003 Rp. 100,000.00 Rp. 300.00
Mandor OH 0.002 Rp. 125,000.00 Rp. 250.00
Bahan
Cat Tembok Watersheald Kg 0.470 Rp 67,500.00 Rp. 31,725.00

Jumlah Total Rp. 38,175.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 38,175.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 38,180.00

5 1 m² Pengecatan Plafond 2 Lapis Dengan Roll


Tenaga
Pekerja OH 0.060 Rp. 80,000.00 Rp. 4,800.00
Tukang Cat OH 0.040 Rp. 90,000.00 Rp. 3,600.00
Kepala Tukang OH 0.004 Rp. 100,000.00 Rp. 400.00
Mandor OH 0.003 Rp. 125,000.00 Rp. 375.00
Bahan
Plamir Tembok Kg 0.100 Rp 11,250.00 Rp 1,125.00
Cat Tembok Emultion Kg 0.470 Rp 22,500.00 Rp 10,575.00
Amplas Lbr 0.500 Rp 2,700.00 Rp 1,350.00

Jumlah Total Rp. 22,225.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 22,225.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 22,230.00

6 1 m² Pengecatan Besi/Baja 2 Lapis Dengan Semprot


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Cat OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.001 Rp 100,000.00 Rp 100.00
Mandor OH 0.001 Rp 125,000.00 Rp 125.00
Bahan
Cat Besi Kg 0.400 Rp 54,000.00 Rp 21,600.00
Minyak Cat Liter 0.300 Rp 11,250.00 Rp 3,375.00

Jumlah Total Rp. 40,300.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 40,300.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 40,300.00
Harga Satuan Pekerjaan Konstruksi 206

1 2 3 4 5 6

7 1 m² Pek. Finishing Melamik Daun Pintu


Tenaga
Pekerja OH 0.500 Rp 80,000.00 Rp 40,000.00
Tukang Cat OH 0.500 Rp 90,000.00 Rp 45,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.005 Rp 125,000.00 Rp 625.00
Bahan
Wood Filler Liter 0.150 Rp 31,500.00 Rp 4,725.00
Wood Stain Liter 0.250 Rp 63,000.00 Rp 15,750.00
Shanding Sealer Liter 0.350 Rp 54,000.00 Rp 18,900.00
Melamic Liter 0.250 Rp 58,500.00 Rp 14,625.00
Thinner Liter 0.500 Rp 11,250.00 Rp 5,625.00
Amplas Lbr 0.500 Rp 2,700.00 Rp 1,350.00
Peralatan
Alat Bantu Ls 1.000 Rp 30,000.00 Rp 30,000.00

Jumlah Total Rp. 181,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 181,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 181,600.00

8 1 m¹ Pek. Finishing Melamik Kusen/Slimar


Tenaga
Pekerja OH 0.250 Rp 80,000.00 Rp 20,000.00
Tukang Cat OH 0.250 Rp 90,000.00 Rp 22,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.003 Rp 125,000.00 Rp 312.50
Bahan
Wood Filler Liter 0.075 Rp 31,500.00 Rp 2,362.50
Wood Stain Liter 0.125 Rp 63,000.00 Rp 7,875.00
Shanding Sealer Liter 0.175 Rp 54,000.00 Rp 9,450.00
Melamic Liter 0.125 Rp 58,500.00 Rp 7,312.50
Thinner Liter 0.250 Rp 11,250.00 Rp 2,812.50
Amplas Lbr 0.250 Rp 2,700.00 Rp 675.00
Peralatan
Alat Bantu Ls 0.500 Rp 30,000.00 Rp 15,000.00

Jumlah Total Rp. 90,800.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 90,800.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 90,800.00

M Analisa Harga Satuan Pekerjaan Sanitasi


1 1 Bh Pasang Closet Duduk
Tenaga
Pekerja OH 3.300 Rp 80,000.00 Rp 264,000.00
Tukang Batu OH 1.100 Rp 90,000.00 Rp 99,000.00
Kepala Tukang OH 0.010 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.160 Rp 125,000.00 Rp 20,000.00
Bahan
Closet Duduk Unit 1.000 Rp 2,317,500.00 Rp 2,317,500.00
Perlengkapan ( 6% Harga Closet ) Ls 0.060 Rp 2,317,500.00 Rp 139,050.00

Jumlah Total Rp. 2,840,550.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 2,840,550.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 2,840,550.00
Harga Satuan Pekerjaan Konstruksi 207

1 2 3 4 5 6

2 1 Bh Pasang Closet Jongkok


Tenaga
Pekerja OH 1.000 Rp 80,000.00 Rp 80,000.00
Tukang Batu OH 1.500 Rp 90,000.00 Rp 135,000.00
Kepala Tukang OH 0.150 Rp 100,000.00 Rp 15,000.00
Mandor OH 0.160 Rp 125,000.00 Rp 20,000.00
Bahan
Closet Jongkok Bh 1.000 Rp 148,320.00 Rp 148,320.00
Semen Portland Kg 6.000 Rp 1,500.00 Rp 9,000.00
Pasir Pasang m3 0.010 Rp 247,500.00 Rp 2,475.00

Jumlah Total Rp. 409,795.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 409,795.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 409,800.00

3 1 Bh Pasang Wastafel
Tenaga
Pekerja OH 1.200 Rp 80,000.00 Rp 96,000.00
Tukang Batu OH 1.450 Rp 90,000.00 Rp 130,500.00
Kepala Tukang OH 0.150 Rp 100,000.00 Rp 15,000.00
Mandor OH 0.060 Rp 125,000.00 Rp 7,500.00
Bahan
Wastafel Bh 1.000 Rp 400,500.00 Rp 400,500.00
Semen Portland Kg 6.000 Rp 1,500.00 Rp 9,000.00
Pasir Pasang m3 0.010 Rp 247,500.00 Rp 2,475.00
Perlengkapan (12% Harga Wastafel ) Ls 0.120 Rp 400,500.00 Rp 48,060.00

Jumlah Total Rp. 709,035.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 709,035.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 709,040.00

4 1 Bh Pasang Bathup ( Bak Mandi ) Poselin


Tenaga
Pekerja OH 0.075 Rp 80,000.00 Rp 6,000.00
Tukang Batu OH 0.750 Rp 90,000.00 Rp 67,500.00
Kepala Tukang OH 0.075 Rp 100,000.00 Rp 7,500.00
Mandor OH 0.003 Rp 125,000.00 Rp 375.00
Bahan
Bathup ( Bak Mandi ) Porselin Bh 1.000 Rp 7,200,000.00 Rp 7,200,000.00
Perlengkapan (20% Harga Wastafel ) Ls 0.200 Rp 7,200,000.00 Rp 1,440,000.00

Jumlah Total Rp. 8,721,375.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 8,721,375.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 8,721,380.00
Harga Satuan Pekerjaan Konstruksi 208

1 2 3 4 5 6

4 1 Bh Pasang Bak Cuci Piring Stainless


Tenaga
Pekerja OH 0.050 Rp 80,000.00 Rp 4,000.00
Tukang Batu OH 0.500 Rp 90,000.00 Rp 45,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.025 Rp 125,000.00 Rp 3,125.00
Bahan
Bak Cuci Piring Stainless Bh 1.000 Rp 270,000.00 Rp 270,000.00
Water Drain / Avur Bh 1.000 Rp 18,000.00 Rp 18,000.00

Jumlah Total Rp. 345,125.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 345,125.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 345,130.00

5 1 Bh Pasang Avur/Floor Drain/Roof Drain


Tenaga
Pekerja OH 0.010 Rp 80,000.00 Rp 800.00
Tukang Batu OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.010 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.005 Rp 125,000.00 Rp 625.00
Bahan
Avur Lantai Bh 1.000 Rp 18,000.00 Rp 18,000.00

Jumlah Total Rp. 29,425.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 29,425.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 29,430.00

6 1 Bh Pasang Kran Air Biasa Stainless


Tenaga
Pekerja OH 0.010 Rp 80,000.00 Rp 800.00
Tukang Batu OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.010 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.005 Rp 125,000.00 Rp 625.00
Bahan
Kran Air Biasa Bh 1.000 Rp 72,000.00 Rp 72,000.00

Jumlah Total Rp. 83,425.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 83,425.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 83,430.00

7 1 Bh Pasang Shower Mandi/Hand Shower


Tenaga
Pekerja OH 0.010 Rp 80,000.00 Rp 800.00
Tukang Batu OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.010 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.005 Rp 125,000.00 Rp 625.00
Bahan
Shower Mandi Bh 1.000 Rp 90,000.00 Rp 90,000.00

Jumlah Total Rp. 101,425.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 101,425.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 101,430.00
Harga Satuan Pekerjaan Konstruksi 209

1 2 3 4 5 6

8 1 Bh Pasang Shower Closet /Spray Shower


Tenaga
Pekerja OH 0.010 Rp 80,000.00 Rp 800.00
Tukang Batu OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.010 Rp 100,000.00 Rp 1,000.00
Mandor OH 0.005 Rp 125,000.00 Rp 625.00
Bahan
Shower Closet Bh 1.000 Rp 72,000.00 Rp 72,000.00

Jumlah Total Rp. 83,425.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 83,425.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 83,430.00

9 1 m¹ Pasang Pipa PVC 3/4" Type AW


Tenaga
Pekerja OH 0.036 Rp 80,000.00 Rp 2,880.00
Tukang Batu OH 0.060 Rp 90,000.00 Rp 5,400.00
Kepala Tukang OH 0.006 Rp 100,000.00 Rp 600.00
Mandor OH 0.002 Rp 125,000.00 Rp 250.00
Bahan
Pipa PVC 3/4" Type AW m1 1.200 Rp 6,300.00 Rp 7,560.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 6,300.00 Rp 2,205.00

Jumlah Total Rp. 18,895.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 18,895.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 18,900.00

10 1 m¹ Pasang Pipa PVC 1" Type AW


Tenaga
Pekerja OH 0.036 Rp 80,000.00 Rp 2,880.00
Tukang Batu OH 0.060 Rp 90,000.00 Rp 5,400.00
Kepala Tukang OH 0.006 Rp 100,000.00 Rp 600.00
Mandor OH 0.002 Rp 125,000.00 Rp 250.00
Bahan
Pipa PVC 1" Type AW m1 1.200 Rp 7,650.00 Rp 9,180.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 7,650.00 Rp 2,677.50

Jumlah Total Rp. 20,987.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 20,987.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 20,990.00

11 1 m¹ Pasang Pipa PVC 1 ½" Type AW


Tenaga
Pekerja OH 0.054 Rp 80,000.00 Rp 4,320.00
Tukang Batu OH 0.090 Rp 90,000.00 Rp 8,100.00
Kepala Tukang OH 0.009 Rp 100,000.00 Rp 900.00
Mandor OH 0.003 Rp 125,000.00 Rp 375.00
Bahan
Pipa PVC 1 ½" Type AW m1 1.200 Rp 12,240.00 Rp 14,688.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 12,240.00 Rp 4,284.00

Jumlah Total Rp. 32,667.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 32,667.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 32,670.00
Harga Satuan Pekerjaan Konstruksi 210

1 2 3 4 5 6

9 1 m¹ Pasang Pipa PVC 2" Type AW


Tenaga
Pekerja OH 0.054 Rp 80,000.00 Rp 4,320.00
Tukang Batu OH 0.090 Rp 90,000.00 Rp 8,100.00
Kepala Tukang OH 0.009 Rp 100,000.00 Rp 900.00
Mandor OH 0.003 Rp 125,000.00 Rp 375.00
Bahan
Pipa PVC 2" Type AW m1 1.200 Rp 18,720.00 Rp 22,464.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 18,720.00 Rp 6,552.00

Jumlah Total Rp. 42,711.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 42,711.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 42,710.00

10 1 m¹ Pasang Pipa PVC 2 ½" Type AW


Tenaga
Pekerja OH 0.081 Rp 80,000.00 Rp 6,480.00
Tukang Batu OH 0.135 Rp 90,000.00 Rp 12,150.00
Kepala Tukang OH 0.0135 Rp 100,000.00 Rp 1,350.00
Mandor OH 0.004 Rp 125,000.00 Rp 500.00
Bahan
Pipa PVC 2 ½" Type AW m1 1.200 Rp 36,000.00 Rp 43,200.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 36,000.00 Rp 12,600.00

Jumlah Total Rp. 76,280.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 76,280.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 76,280.00

12 1 m¹ Pasang Pipa PVC 3" Type AW


Tenaga
Pekerja OH 0.081 Rp 80,000.00 Rp 6,480.00
Tukang Batu OH 0.135 Rp 90,000.00 Rp 12,150.00
Kepala Tukang OH 0.0135 Rp 100,000.00 Rp 1,350.00
Mandor OH 0.004 Rp 125,000.00 Rp 500.00
Bahan
Pipa PVC 3" Type AW m1 1.200 Rp 29,970.00 Rp 35,964.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 29,970.00 Rp 10,489.50

Jumlah Total Rp. 66,933.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 66,933.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 66,930.00

13 1 m¹ Pasang Pipa PVC 4" Type AW


Tenaga
Pekerja OH 0.081 Rp 80,000.00 Rp 6,480.00
Tukang Batu OH 0.135 Rp 90,000.00 Rp 12,150.00
Kepala Tukang OH 0.0135 Rp 100,000.00 Rp 1,350.00
Mandor OH 0.004 Rp 125,000.00 Rp 500.00
Bahan
Pipa PVC 4" Type AW m1 1.200 Rp 45,630.00 Rp 54,756.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 45,630.00 Rp 15,970.50

Jumlah Total Rp. 91,206.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 91,206.50
Harga Satuan Pekerjaan Konstruksi 211

1 2 3 4 5 6
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 91,210.00

1 1 m¹ Penarikan Kabel NYY 3 x 2,5 mm²


Tenaga
Pekerja OH 0.070 Rp 80,000.00 Rp 5,600.00
Tukang Listrik OH 0.050 Rp 90,000.00 Rp 4,500.00
Kepala Tukang OH 0.030 Rp 100,000.00 Rp 3,000.00
Mandor OH 0.030 Rp 125,000.00 Rp 3,750.00
Bahan
Kabel NYY 3 x 2,5 mm² m1 1.150 Rp 11,250.00 Rp 12,937.50

Jumlah Total Rp. 29,787.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 29,787.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 29,790.00

2 1 Bh Pasang Lampu Downlight Washer Led MR 16


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Downlight Washer Led MR 16 Set 1.000 Rp 148,500.00 Rp 148,500.00

Jumlah Total Rp. 168,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 168,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 168,600.00

3 1 Bh Pasang Lampu DownLight LED 12 Watt Komplit


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Spot Light LED 18 Watt Komplit Set 1.000 Rp 157,500.00 Rp 157,500.00

Jumlah Total Rp. 177,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 177,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 177,600.00

- 1 Unit Pasang Lampu PendanLamp Komplit


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu PendanLamp Set 1.000 Rp 337,500.00 Rp 337,500.00

Jumlah Total Rp. 357,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 357,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 357,600.00
Harga Satuan Pekerjaan Konstruksi 212

1 2 3 4 5 6

- 1 Bh Pasang Lampu Dinding


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Dinding Komplit Set 1.000 Rp 382,500.00 Rp 382,500.00

Jumlah Total Rp. 402,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 402,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 402,600.00

- 1 Bh Pasang Lampu Floodlight


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Floodlight IP65 Set 1.000 Rp 391,500.00 Rp 391,500.00

Jumlah Total Rp. 411,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 411,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 411,600.00

- 1 Bh Pasang Downlight 12 watt Komplit


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Downlight 12 Watt Komplit Set 1.000 Rp 139,500.00 Rp 139,500.00

Jumlah Total Rp. 159,600.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 159,600.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 159,600.00

15 1 Unit Pasang Indireck led T5


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Lampu Indirect Led T5 (Strip) m1 1.050 Rp 12,150.00 Rp 12,757.50

Jumlah Total Rp. 32,857.50


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 32,857.50
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 32,860.00
Harga Satuan Pekerjaan Konstruksi 213

1 2 3 4 5 6

9 1 Bh Pasang Stop Kontak


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Stop Kontak Bh 1.000 Rp 11,790.00 Rp 11,790.00

Jumlah Total Rp. 31,890.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 31,890.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 31,890.00

10 1 Bh Pasang Saklar Tunggal


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Saklar Tunggal Bh 1.000 Rp 9,720.00 Rp 9,720.00

Jumlah Total Rp. 29,820.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 29,820.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 29,820.00

11 1 Bh Pasang Saklar Ganda


Tenaga
Pekerja OH 0.020 Rp 80,000.00 Rp 1,600.00
Tukang Listrik OH 0.150 Rp 90,000.00 Rp 13,500.00
Kepala Tukang OH 0.025 Rp 100,000.00 Rp 2,500.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Saklar Ganda Bh 1.000 Rp 12,960.00 Rp 12,960.00

Jumlah Total Rp. 33,060.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 33,060.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 33,060.00

12 1 Ttk Pasang Intalasi Titik Lampu


Tenaga
Pekerja OH 0.050 Rp 80,000.00 Rp 4,000.00
Tukang Listrik OH 0.500 Rp 90,000.00 Rp 45,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Kabel NYY 2 x 1,5" m1 7.500 Rp. 10,170.00 Rp 76,275.00
Pipa Conduilt Ljr 1.000 Rp. 9,000.00 Rp 9,000.00
Isolator Bh 1.000 Rp. 2,700.00 Rp 2,700.00
Las Doof Bh 1.000 Rp. 450.00 Rp 450.00
T dos PVC Bh 2.000 Rp. 1,800.00 Rp 3,600.00
Fitting Lampu Bh 1.000 Rp. 9,000.00 Rp 9,000.00
Harga Satuan Pekerjaan Konstruksi 214

1 2 3 4 5 6
Jumlah Total Rp. 157,525.00
Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 157,525.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 157,530.00

13 1 Ttk Pasang Instalasi Stop Kontak


Tenaga
Pekerja OH 0.050 Rp 80,000.00 Rp 4,000.00
Tukang Listrik OH 0.500 Rp 90,000.00 Rp 45,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Kabel NYY 3 x 2,5" m1 4.000 Rp. 11,250.00 Rp 45,000.00
Pipa Conduilt Ljr 0.200 Rp. 9,000.00 Rp 1,800.00
T dos PVC Bh 1.000 Rp. 1,800.00 Rp 1,800.00

Jumlah Total Rp. 105,100.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 105,100.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 105,100.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 18,035,700.00

14 1 Unit Pasang AC 1/2 PK Split Wall Maunted


Tenaga
Pekerja OH 0.240 Rp 80,000.00 Rp 19,200.00
Tukang Listrik OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
AC 1/2 PK Split Wall Maunted Bh 1.000 Rp. 2,700,000.00 Rp 2,700,000.00

Jumlah Total Rp. 2,735,700.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 2,735,700.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 2,735,700.00

15 1 Unit Pasang AC 1 PK Split Wall Maunted


Tenaga
Pekerja OH 0.240 Rp 80,000.00 Rp 19,200.00
Tukang Listrik OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
AC 1 PK Split Wall Maunted Bh 1.000 Rp. 3,150,000.00 Rp 3,150,000.00

Jumlah Total Rp. 3,185,700.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 3,185,700.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 3,185,700.00

15 1 Unit Pasang AC 2 PK Split Wall Maunted


Tenaga
Pekerja OH 0.240 Rp 80,000.00 Rp 19,200.00
Tukang Listrik OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
AC 2 PK Split Wall Maunted Bh 1.000 Rp. 5,850,000.00 Rp 5,850,000.00
Harga Satuan Pekerjaan Konstruksi 215

1 2 3 4 5 6
Jumlah Total Rp. 5,885,700.00
Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 5,885,700.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 5,885,700.00

16 1 Unit Pasang AC 1,5 PK Split Wall Maunted


Tenaga
Pekerja OH 0.240 Rp 80,000.00 Rp 19,200.00
Tukang Listrik OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
AC 1,5 PK Split Wall Maunted Bh 1.000 Rp. 3,600,000.00 Rp 3,600,000.00

Jumlah Total Rp. 3,635,700.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 3,635,700.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 3,635,700.00

17 1 Unit Pasang Exhaust Fan 110 Cfm Ceiling Mounted


Tenaga
Pekerja OH 0.240 Rp 80,000.00 Rp 19,200.00
Tukang Listrik OH 0.100 Rp 90,000.00 Rp 9,000.00
Kepala Tukang OH 0.050 Rp 100,000.00 Rp 5,000.00
Mandor OH 0.020 Rp 125,000.00 Rp 2,500.00
Bahan
Exhaust Fan 110 Cfm Ceiling Mounted Bh 1.000 Rp. 405,000.00 Rp 405,000.00

Jumlah Total Rp. 440,700.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 440,700.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 440,700.00

18 1 Ttk Pasang Instalasi AC / Exhaust


Tenaga
Pekerja OH 0.500 Rp 80,000.00 Rp 40,000.00
Tukang Listrik OH 0.250 Rp 90,000.00 Rp 22,500.00
Kepala Tukang OH 0.250 Rp 100,000.00 Rp 25,000.00
Mandor OH 0.025 Rp 125,000.00 Rp 3,125.00
Bahan
Kabel NYA 2,5 mm2 m1 5.000 Rp. 11,250.00 Rp 56,250.00
Pipa Conduilt Ljr 1.000 Rp. 9,000.00 Rp 9,000.00
Stop Kontak Bh 1.000 Rp. 11,790.00 Rp 11,790.00
T dos PVC Bh 1.000 Rp. 1,800.00 Rp 1,800.00

Jumlah Total Rp. 169,465.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 169,465.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 169,470.00
Harga Satuan Pekerjaan Konstruksi 216

1 2 3 4 5 6

19 1 m¹ Pasang Pipa Drain 5/8


Tenaga
Pekerja OH 0.036 Rp 80,000.00 Rp 2,880.00
Tukang Batu OH 0.060 Rp 90,000.00 Rp 5,400.00
Kepala Tukang OH 0.006 Rp 100,000.00 Rp 600.00
Mandor OH 0.002 Rp 125,000.00 Rp 250.00
Bahan
Pipa PVC 5/8" m1 1.000 Rp 2,700.00 Rp 2,700.00
Prelengkapan ( 35% Harga Pipa ) Ls 0.350 Rp 2,700.00 Rp 945.00

Jumlah Total Rp. 12,775.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 12,775.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 12,780.00

O Analisa Harga Satuan Pekerjaan Taman


1 1 m³ Pek. Urugan Tanah Humus
Bahan
Tanah Humus m3 1.200 Rp 117,000.00 Rp 140,400.00
Tenaga
Pekerja OH 0.250 Rp 80,000.00 Rp 20,000.00
Mandor OH 0.025 Rp 125,000.00 Rp 3,125.00

Jumlah Total Rp. 163,525.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 163,525.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 163,530.00

2 1 m² Tanam Rumput Gajah Mini


Bahan
Rumput Gajah Mini 1 m² 1.000 Rp 22,500.00 Rp 22,500.00
Tenaga -
Pekerja Oh 0.050 Rp 80,000.00 Rp 4,000.00
Mandor Oh 0.005 Rp 125,000.00 Rp 625.00

Jumlah Total Rp. 27,125.00


Overhead & Profit 10% (B) Rp. -
Jumlah Keseluruhan (A + B) Rp. 27,125.00
Harga Satuan Pekerjaan Konstruksi (DibulaRp. 27,130.00

P Analisa Harga Satuan Pekerjaan Pintu/Jendela


1 1 Unit Pasang Pintu Type 1 (PU)
Pekerjaan
Kusen kayu 6/14 m3 0.046 Rp 12,244,680.00 Rp 557,132.94
Daun Pintu Panil Kayu kamper m2 3.060 Rp 788,190.00 Rp 2,411,861.40
Pasang Handel Pintu Bh 2.000 Rp 235,000.00 Rp 470,000.00
Pasang Kunci Pintu 2x Putar Set 1.000 Rp 124,000.00 Rp 124,000.00
Pasang Engsel Pintu Bh 2.000 Rp 32,350.00 Rp 64,700.00
Pasang Kunci Slot / Grendel Pintu Bh 1.000 Rp 24,400.00 Rp 24,400.00
Pek. Finishing Melamik Kusen/Slimar m1 6.500 Rp 90,800.00 Rp 590,200.00
Pek. Finishing Melamik Daun Pintu m1 3.060 181,600.00 Rp 555,696.00
Jumlah Total Rp. 3,627,694.34
Harga Satuan Pekerjaan Konstruksi (Dibula Rp. 3,627,690.00

1 Unit Pasang Pintu Type 1 ( P1 )


Pekerjaan
Kusen kayu 6/14 m3 0.043 Rp 12,244,680.00 Rp 522,847.84
Daun Pintu Panil Kayu kamper m2 1.960 Rp 788,190.00 Rp 1,544,852.40
Harga Satuan Pekerjaan Konstruksi 217

1 2 3 4 5 6
Pasang Handel Pintu Bh 2.000 Rp 235,000.00 Rp 470,000.00
Pasang Kunci Pintu 2x Putar Set 1.000 Rp 124,000.00 Rp 124,000.00
Pasang Engsel Pintu Bh 3.000 Rp 32,350.00 Rp 97,050.00
Pasang Kunci Slot / Grendel Pintu Bh 1.000 Rp 24,400.00 Rp 24,400.00
Pek. Finishing Melamik Kusen/Slimar m1 6.100 Rp 90,800.00 Rp 553,880.00
Pek. Finishing Melamik Daun Pintu m2 1.960 Rp 181,600.00 Rp 355,936.00

Jumlah Total Rp. 3,692,966.24


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 3,692,970.00

1 Unit Pasang Pintu Type 2 ( P2 )


Pekerjaan
Kusen kayu 6/14 m3 0.042 Rp 12,244,680.00 Rp 514,276.56
Daun Pintu Panil Kayu kamper m2 1.785 Rp 788,190.00 Rp 1,406,919.15
Pasang Handel Pintu Bh 2.000 Rp 235,000.00 Rp 470,000.00
Pasang Kunci Pintu 2x Putar Set 1.000 Rp 124,000.00 Rp 124,000.00
Pasang Engsel Pintu Bh 3.000 Rp 32,350.00 Rp 97,050.00
Pasang Kunci Slot / Grendel Pintu Bh 1.000 Rp 24,400.00 Rp 24,400.00
Pek. Finishing Melamik Kusen/Slimar m1 6.200 Rp 90,800.00 Rp 562,960.00
Pek. Finishing Melamik Daun Pintu m2 1.785 Rp 181,600.00 Rp 324,156.00

Jumlah Total Rp. 3,523,761.71


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 3,523,760.00

1 Unit Pasang Pintu TypePS( PS1 )


Pekerjaan
Kusen kayu 6/14 m3 0.056 Rp 12,244,680.00 Rp 685,702.08
Daun Pintu Panil Kayu kamper m2 7.500 Rp 788,190.00 Rp 5,911,425.00
Pasang Handel Pintu Bh 2.000 Rp 235,000.00 Rp 470,000.00
Pasang Kunci Pintu 2x Putar Set 1.000 Rp 124,000.00 Rp 124,000.00
Pasang Engsel Geser Bh 3.000 Rp 146,500.00 Rp 439,500.00
Pasang Kunci Slot / Grendel Pintu Bh 1.000 Rp 24,400.00 Rp 24,400.00
Pek. Finishing Melamik Kusen/Slimar m1 8.000 Rp 90,800.00 Rp 726,400.00
Pek. Finishing Melamik Daun Pintu m2 7.500 Rp 181,600.00 Rp 1,362,000.00

Jumlah Total Rp. 9,743,427.08


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 9,743,430.00

1 Unit Pasang Pintu TypePS2 ( PS2 )


Pekerjaan
Kusen kayu 6/14 m3 0.060 Rp 12,244,680.00 Rp 732,844.10
Daun Pintu Panil Kayu kamper m2 8.873 Rp 788,190.00 Rp 6,993,215.78
Pasang Handel Pintu Bh 2.000 Rp 235,000.00 Rp 470,000.00
Pasang Kunci Pintu 2x Putar Set 1.000 Rp 124,000.00 Rp 124,000.00
Pasang Engsel Geser Bh 3.000 Rp 146,500.00 Rp 439,500.00
Pasang Kunci Slot / Grendel Pintu Bh 1.000 Rp 24,400.00 Rp 24,400.00
Pasang Kunci Pintu Floorhing m2 8.550 Rp 181,600.00 Rp 1,552,680.00

Jumlah Total Rp. 10,336,639.87


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 10,336,640.00

1 Unit Pasang Jendela Type 1 ( J1 )


Pekerjaan
Kusen kayu 6/14 m3 0.053 Rp 12,244,680.00 Rp 651,416.98
Daun Jendela Kayu kamper m2 2.976 Rp 604,160.00 Rp 1,797,980.16
Pasang Kaca Bening T=6mm m2 1.260 Rp 182,170.00 Rp 229,534.20
Pasang Engsel jendela Bh 2.000 Rp 26,050.00 Rp 52,100.00
Pasang Kunci Slot / Grendel Jendela Bh 1.000 Rp 16,660.00 Rp 16,660.00
Hak Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Harga Satuan Pekerjaan Konstruksi 218

1 2 3 4 5 6
Pasang Handel Jendela Bh 1.000 Rp 37,000.00 Rp 37,000.00
Pek. Finishing Melamik Kusen/Slimar m1 7.600 Rp 90,800.00 Rp 690,080.00
Pek. Finishing Melamik Daun Pintu m2 2.976 Rp 181,600.00 Rp 540,441.60

Jumlah Total Rp. 4,062,212.94


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 4,062,210.00

1 Unit Pasang Jendela Type2 ( J2 )


Pekerjaan
Kusen kayu 6/14 m3 0.485 Rp 12,244,680.00 Rp 5,935,608.63
Daun Jendela Kayu kamper m2 2.083 Rp 604,160.00 Rp 1,258,344.45
Pasang Kaca Bening T=6mm m2 2.570 Rp 182,170.00 Rp 468,176.90
Pasang Engsel jendela Set 2.000 Rp 26,050.00 Rp 52,100.00
Pasang Kunci Slot / Grendel Jendela Bh 2.000 Rp 16,660.00 Rp 33,320.00
Hak Angin Bh 4.000 Rp 23,500.00 Rp 94,000.00
Pasang Handel Jendela Bh 2.000 Rp 37,000.00 Rp 74,000.00
Pek. Finishing Melamik Kusen/Slimar m1 69.250 Rp 90,800.00 Rp 6,287,900.00
Pek. Finishing Melamik Daun Pintu m2 2.083 Rp 181,600.00 Rp 378,236.48

Jumlah Total Rp. 14,581,686.46


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 14,581,690.00

1 Unit Pasang Jendela Type3 ( J3 )


Pekerjaan
Kusen kayu 6/14 m3 0.077 Rp 12,244,680.00 Rp 942,840.36
Daun Jendela Kayu kamper m2 1.054 Rp 604,160.00 Rp 636,784.64
Pasang Kaca Bening T=6mm m2 2.750 Rp 182,170.00 Rp 500,967.50
Pasang Engsel jendela Set 3.000 Rp 26,050.00 Rp 78,150.00
Pasang Kunci Slot / Grendel Jendela Bh 1.000 Rp 16,660.00 Rp 16,660.00
Hak Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Pasang Handel Jendela Bh 1.000 Rp 37,000.00 Rp 37,000.00
Pek. Finishing Melamik Kusen/Slimar m1 11.000 Rp 90,800.00 Rp 998,800.00
Pek. Finishing Melamik Daun Pintu m2 1.054 Rp 181,600.00 Rp 191,406.40

Jumlah Total Rp. 3,449,608.90


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 3,449,610.00

1 Unit Pasang Jendela Type4 ( J4 )


Pekerjaan
Kusen kayu 6/14 m3 0.065 Rp 12,244,680.00 Rp 791,985.90
Daun Jendela Kayu kamper m2 0.810 Rp 604,160.00 Rp 489,369.60
Pasang Kaca Bening T=6mm m2 1.980 Rp 182,170.00 Rp 360,696.60
Pasang Engsel jendela Set 2.000 Rp 26,050.00 Rp 52,100.00
Pasang Kunci Slot / Grendel Jendela Bh 1.000 Rp 16,660.00 Rp 16,660.00
Hak Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Pasang Handel Jendela Bh 1.000 Rp 37,000.00 Rp 37,000.00
Pek. Finishing Melamik Kusen/Slimar m1 9.240 Rp 90,800.00 Rp 838,992.00
Pek. Finishing Melamik Daun Pintu m2 0.810 Rp 181,600.00 Rp 147,096.00

Jumlah Total Rp. 2,780,900.10


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 2,780,900.00

1 Unit Pasang Jendela Type5 ( J5 )


Pekerjaan
Kusen kayu 6/14 m3 0.046 Rp 12,244,680.00 Rp 561,418.58
Daun Jendela Kayu kamper m2 0.924 Rp 604,160.00 Rp 558,243.84
Pasang Kaca Bening T=6mm m2 1.980 Rp 182,170.00 Rp 360,696.60
Pasang Engsel jendela Set 2.000 Rp 26,050.00 Rp 52,100.00
Pasang Kunci Slot / Grendel Jendela Bh 1.000 Rp 16,660.00 Rp 16,660.00
Harga Satuan Pekerjaan Konstruksi 219

1 2 3 4 5 6
Hak Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Pasang Handel Jendela Bh 1.000 Rp 37,000.00 Rp 37,000.00
Pek. Finishing Melamik Kusen/Slimar m1 9.240 Rp 90,800.00 Rp 838,992.00
Pek. Finishing Melamik Daun Pintu m2 0.924 Rp 181,600.00 Rp 167,798.40

Jumlah Total Rp. 2,639,909.42


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 2,639,910.00

1 Unit Pasang Boven Type1 ( BV1 )


Pekerjaan
Kusen kayu 6/14 m3 0.020 Rp 12,244,680.00 Rp 239,995.73
Daun Jendela Kayu kamper m2 0.490 Rp 604,160.00 Rp 296,038.40
Pasang Kaca Bening T=6mm m2 0.360 Rp 182,170.00 Rp 65,581.20
Pasang Engsel jendela Bh 2.000 Rp 16,660.00 Rp 33,320.00
Pasang Kait Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Pasang Handel Jendela Bh 2.000 Rp 37,000.00 Rp 74,000.00
Pek. Finishing Melamik Kusen/Slimar m1 2.800 Rp 90,800.00 Rp 254,240.00
Pek. Finishing Melamik Daun Pintu m2 0.020 Rp 181,600.00 Rp 3,559.36

Jumlah Total Rp. 1,013,734.69


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 1,013,730.00

1 Unit Pasang Boven Type2 ( BV2 )


Pekerjaan
Kusen kayu 6/14 m3 0.034 Rp 12,244,680.00 Rp 411,421.25
Daun Jendela Kayu kamper m2 0.894 Rp 604,160.00 Rp 540,360.70
Pasang Kaca Bening T=6mm m2 0.600 Rp 182,170.00 Rp 109,374.87
Pasang Engsel jendela Bh 3.000 Rp 16,660.00 Rp 49,980.00
Pasang Kait Angin Bh 2.000 Rp 23,500.00 Rp 47,000.00
Pasang Handel Jendela Bh 1.000 Rp 37,000.00 Rp 37,000.00
Pek. Finishing Melamik Kusen/Slimar m1 4.800 Rp 23,500.00 Rp 112,800.00
Pek. Finishing Melamik Daun Pintu m2 0.034 Rp 37,000.00 Rp 1,243.20
Jumlah Total Rp. 1,309,180.02
Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 1,309,180.00

1 Unit Pasang Skyligt Depan


Pekerjaan
Besi Hollow 4x8 m1 73.350 Rp 10,125.00 Rp 742,668.75
Pasang Kaca 5Clear+5mm m2 37.074 Rp 842,500.00 Rp 31,234,634.38
Acc 0.200 Rp 6,246,926.88 Rp 1,249,385.38

Jumlah Total Rp. 33,226,688.50


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 33,226,690.00

1 Unit Pasang Skyligt Tengah


Pekerjaan
Besi Hollow 4x8 m1 18.940 Rp 10,125.00 Rp 191,767.50
Pasang Kaca 5Clear+5mm m2 7.473 Rp 842,500.00 Rp 6,296,002.50
Acc 0.200 Rp 1,259,200.50 Rp 251,840.10

Jumlah Total Rp. 6,739,610.10


Harga Satuan Pekerjaan Konstruksi (Dibulatkan) Rp. 6,739,610.00
DAFTAR UPAH TENAGA DAN SEWA ALAT

Kegiatan : Pembanguan Rumah


Pekerjaan : Pembanguan Rumah BU Diana

No. Uraian Satuan Harga Satuan

- UPAH TENAGA
1 Mandor OH Rp. 125,000.00
2 Kepala Tukang OH Rp. 100,000.00
3 Tukang Kayu OH Rp. 90,000.00
4 Tukang Batu OH Rp. 90,000.00
5 Tukang Cat OH Rp. 90,000.00
6 Tukang Listrik OH Rp. 90,000.00
7 Tukang Besi OH Rp. 90,000.00
8 Tukang Las Konstruksi OH Rp. 90,000.00
9 Tukang Aluminium / Galvalume OH Rp. 90,000.00
7 Tukang Taman OH Rp. 90,000.00
9 Pekerja OH Rp. 80,000.00
10 Operator Terlatih OH Rp. 90,000.00
11 Sopir OH Rp. 90,000.00

- SEWA ALAT
1 Sewa Alat Las Jam Rp. 50,000.00
1 Alat Bantu Set Rp. 3,000.00
3 Sewa Buldozer 100 HP Jam Rp. 272,412.53
4 Sewa Water Truck Tank ( Truk Tangki Air ) Jam Rp. 295,725.09
5 Sewa Roller 3 Whell 8-10 Ton Jam Rp. 225,966.80
6 Sewa Mesin Gilas Bergetar 1 Ton Jam Rp. 41,902.53
2 Sewa Mobil Crane Jam Rp. 500,000.00
3 Sewa Manual Crane ( Tripot ) Jam Rp. 50,000.00
4 Electrik Tool Kits Set Rp. 150,000.00
5 Sewa Truck Hari Rp. 800,000.00
6 Chain Block Hari Rp. 200,000.00

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
0
DAFTAR HARGA BAHAN

Kegiatan : Pembanguan Rumah


Pekerjaan : Pembanguan Rumah BU Diana

No. Uraian Bahan Satuan Harga Satuan

1 Papan Nama Kegiatan Unit Rp. 180,000.00


2 Rambu - Rambu Proyek Unit Rp. 225,000.00
3 Air Liter Rp. 180.00
4 Tanah Urug Pilihan m³ Rp. 67,500.00
5 Pasir Urug m³ Rp. 155,700.00
6 Pasir Pasang m³ Rp. 247,500.00
7 Pasir Beton m³ Rp. 247,500.00
8 Batu Belah (Batu Kali / Gunung) m³ Rp. 157,500.00
9 Batu Kerikil m³ Rp. 247,500.00
9 Koral Beton ( Maksimal 30 mm ) m³ Rp. 285,480.00
10 Bata Merah Bh Rp. 700.00
12 Bata Ringan Tbl. 10 Cm m³ Rp. 689,724.00
18 Semen Portland Kg Rp. 1,500.00
19 Semen Mortar MU 380 @ 40 Kg (Perekat Bata Ringan) Zak Rp. 153,000.00
20 Semen Mortar MU 290 @ 40 Kg (Finishing Plester dan Acian) Zak Rp. 162,000.00
21 Semen Mortar MU 200 @ 40 Kg (Acian dan Plester Beton) Zak Rp. 162,000.00
22 Semen Nat Kg Rp. 9,000.00
23 Betacoat Kg Rp. 2,700.00
24 Tepung Gysum Kg Rp. 2,700.00
24 Kayu Parquet jati m2 Rp. 225,000.00
25 Wood Composit Panel m2 Rp. 83,250.00
25 kayu Jati Fin Melamik m2 Rp. 202,500.00
25 Kayu Jati Reng m³ Rp. 6,300,000.00
26 Kayu Jati Kaso m³ Rp. 9,000,000.00
27 Kayu Jati Balok m³ Rp. 12,150,000.00
28 Kayu Jati Papan m³ Rp. 12,150,000.00
29 Kayu Kruing Kaso m³ Rp. 6,075,000.00
30 Kayu Kruing Balok m³ Rp. 6,750,000.00
31 Kayu Kruing Papan m³ Rp. 7,200,000.00
32 Kayu Kamper / Bengkirai Kaso m³ Rp. 8,100,000.00
33 Kayu Kamper / Bengkirai Balok m³ Rp. 9,000,000.00
34 Kayu Kamper / Bengkirai Papan m³ Rp. 9,900,000.00
25 Kayu Lokal Kaso m³ Rp. 4,500,000.00
26 Kayu Lokal Balok m³ Rp. 4,950,000.00
27 Kayu Lokal Papan m³ Rp. 5,400,000.00
28 Angin - Angin Kayu Jati Uk. 15 x 20 Bh Rp. 22,500.00
29 Kayu Begesting m³ Rp. 2,199,330.00
30 Kayu Perencah m³ Rp. 4,010,580.00
31 Kayu Dolken Ø 8 - 10 / 400 Cm Btg Rp. 9,000.00
32 Bambu Diameter 6 - 8 / 400 Cm Btg Rp. 9,000.00
33 Ijuk m³ Rp. 270,000.00
34 Plywood 120 x 240 x 4 mm Lbr Rp. 58,500.00
35 Plywood 120 x 240 x 9 mm Lbr Rp. 103,500.00
36 Plywood 120 x 240 x 12 mm Lbr Rp. 175,500.00
No. Uraian Bahan Satuan Harga Satuan

37 Genteng Press Lokal Bh Rp. 1,800.00


38 Genteng Press Ex. Wisma, Goodyears Bh Rp. 4,050.00
39 Genteng Press Ex. Nglayur Bh Rp. 3,060.00
40 Genteng Beton Bh Rp. 5,400.00
41 Genteng Glaszur Bh Rp. 6,300.00
42 Genteng Keramik Bh Rp. 8,400.00
43 Bubungan Genteng Press Lokal Bh Rp. 7,200.00
44 Bubungan Genteng Ex. Nglayur, Wisma, Goodyears Bh Rp. 9,000.00
45 Bubungan Genteng Beton Bh Rp. 9,000.00
46 Bubungan Genteng Keramik Bh Rp. 18,000.00
37 Genteng Tepi / Ending Bh Rp. 13,500.00
38 Seng Plat Datar BJLS 30/90 m¹ Rp. 36,000.00
39 Seng Plat Datar Galvalume m¹ Rp. 39,600.00
40 Asbes Gelombang Kecil m² Rp. 40,500.00
41 Asbes Gelombang Besar m² Rp. 45,000.00
42 Seng Galvalume m² Rp. 72,000.00
43 Seng Gelombang m² Rp. 40,500.00
44 Fiber Glass Uk. 90 x 180 m² Rp. 63,000.00
45 Bubungan Stell Gelombang Bh Rp. 36,000.00
46 Genteng Onduvilla Uk. ( 40 x 106 ) Cm Lbr Rp. 47,250.00
47 Bubungan / Nok Onduvilla Bh Rp. 103,500.00
48 Aluminium Composite Panel ( ACP ) m² Rp. 585,000.00
49 Aluminium Foil m² Rp. 157,500.00
50 Paku Kayu Kg Rp. 12,240.00
51 Paku Pancing Kg Rp. 27,000.00
52 Paku Eternit Kg Rp. 27,000.00
53 Besi Beton Polos Kg Rp. 9,540.00
54 Besi Beton Ulir Kg Rp. 9,990.00
55 Besi Wiremesh Kg Rp. 9,450.00
56 Besi Baja Profil Kg Rp. 12,500.00
57 Besi Baja WF Kg Rp. 13,500.00
58 Besi Plat Kg Rp. 13,500.00
59 Besi Strip Kg Rp. 13,500.00
60 Kawat Beton Kg Rp. 18,000.00
61 Kawat Berduri m¹ Rp. 2,700.00
62 Kawat Las Kg Rp. 22,500.00
63 Kunci Tanam Biasa Bh Rp. 76,500.00
64 Kunci Tanam 2X Putar Bh Rp. 99,000.00
65 Kunci Pintu Floorhing Bh Rp. 675,000.00
66 Kunci Pintu Geser / Sliding Bh Rp. 121,500.00
67 Engsel Pintu Type Ball Bearing Bh Rp. 19,800.00
68 Engsel Pintu Floorhing Bh Rp. 1,800,000.00
69 Engsel Jendela Type Ball Bearing Bh Rp. 13,500.00
70 Engsel Jendela Casement 12" Bh Rp. 67,500.00
71 Engsel Angin Bh Rp. 12,600.00
72 Kait Angin Bh Rp. 13,500.00
73 Lever Handel Pintu Bh Rp. 27,000.00
74 Pull Handel Pintu Bh Rp. 225,000.00
75 Handel Bambu Aluminium Bh Rp. 36,000.00
76 Handel Jendela Bh Rp. 13,500.00
No. Uraian Bahan Satuan Harga Satuan

77 Kunci Slot / Grendel Pintu Bh Rp. 14,400.00


78 Kunci Slot / Grendel Jendela Bh Rp. 6,660.00
79 Kunci Jendela Aluminium Bh Rp. 36,000.00
80 Spring Knip Bh Rp. 18,000.00
81 Door Closer Bh Rp. 162,000.00
82 Door Stoper Bh Rp. 27,000.00
83 Rel Pintu Geser Set Rp. 198,000.00
84 Kunci Lemari Set Rp. 54,000.00
85 Kunci Gembok Bh Rp. 31,500.00
86 Kaca Bening Tebal 5 mm m² Rp. 142,200.00
87 Kaca Bening Tebal 8 mm m² Rp. 220,500.00
88 Kaca Reyband 5 mm m² Rp. 128,700.00
89 Kaca Reyband 8 mm m² Rp. 192,600.00
90 Kaca Es / Buram 5 mm m² Rp. 207,000.00
91 Kaca Cermin 5 mm m² Rp. 180,000.00
92 Kaca Tempered 12 mm m² Rp. 694,800.00
93 Kaca One Way Tbl 5 mm m² Rp. 450,000.00
94 Kaca bening +5 mm Laminated Tempered m² Rp. 742,500.00
95 Kaca One Way Tbl 12 mm m² Rp. 1,125,000.00
96 Kaca Patri Tbl. 5 mm m² Rp. 228,600.00
97 Kaca Sandblasting Tbl 8 mm m² Rp. 540,000.00
98 Kaca Nako Bh Rp. 31,500.00
99 Besi Hollow Plafond Zincromate Uk. 2/4 x 400 Btg Rp. 22,500.00
100 Besi Hollow Plafond Zincromate Uk. 4/4 x 400 Btg Rp. 36,000.00
101 Besi Hollow Uk. 20 x 40 x 1.1 mm m¹ Rp. 19,800.00
102 Besi Hollow Uk. 40 x 840 x 1 mm m¹ Rp. 60,750.00
103 Kayu Lattice papan m¹ Rp. 69,750.00
103 Kusen Aluminium 3" Silver m¹ Rp. 54,000.00
104 Kusen Aluminium 3" Coklat m¹ Rp. 67,500.00
105 Kusen Aluminium 4" Silver m¹ Rp. 108,000.00
106 Kusen Aluminium 4" Coklat m¹ Rp. 135,000.00
107 Profil Daun Jendela Aluminium m¹ Rp. 36,000.00
108 Profil Daun Pintu Aluminium m¹ Rp. 67,500.00
109 Plat Aluminium m² Rp. 90,000.00
110 Trust/Kaso Zincalume / Baja Ringan m¹ Rp. 18,000.00
111 Reng Zincalume / Baja Ringan m¹ Rp. 6,750.00
112 Bracing m¹ Rp. 7,200.00
113 Screw 12-14x20 Bh Rp. 360.00
114 Screw 12-14x16 Bh Rp. 360.00
115 Skrup Fixer Bh Rp. 720.00
116 Skrup Onduvilla / Speedy Screw Bh Rp. 990.00
117 Ramset / Dinabolt Bh Rp. 7,200.00
118 Bracket Bh Rp. 15,750.00
119 Mur / Baut Bh Rp. 1,440.00
120 Galvanized Kg Rp. 3,150.00
121 Baut Ø 10 mm (3/8") Bh Rp. 3,600.00
122 Baut Ø 12 mm (1/2") Bh Rp. 5,850.00
123 Baut Ø 16 mm (5/8") Bh Rp. 15,750.00
124 Angkur 16 mm ( L 16 x 40 ) Bh Rp. 27,000.00
No. Uraian Bahan Satuan Harga Satuan

125 Angkur 19 mm ( L 19 x 50 ) Bh Rp. 32,400.00


126 Amplas Lbr Rp. 2,700.00
127 Kapi Bh Rp. 5,400.00
128 Soda Api Kg Rp. 10,800.00
129 Plamir Tembok Kg Rp. 11,250.00
130 Cat Dasar Alkali Shealer Kg Rp. 45,000.00
131 Cat Tembok Emultion Kg Rp. 22,500.00
132 Cat Tembok Watersheal Kg Rp. 67,500.00
133 Teer / Residu Liter Rp. 19,800.00
134 Meni Kayu Kg Rp. 27,000.00
135 Meni Besi Kg Rp. 27,000.00
136 Plamir/Dempul Kayu Kg Rp. 22,500.00
137 Cat Epoxy Kg Rp. 81,000.00
138 Cat Kayu Kg Rp. 50,040.00
139 Sirlack Kg Rp. 45,000.00
140 Shanding Shealer Liter Rp. 54,000.00
141 Vernis Kayu Liter Rp. 52,200.00
142 Cat Besi Kg Rp. 54,000.00
143 Cat Anti Karat ( Zincromate ) Kg Rp. 45,000.00
144 Cat Genteng Kg Rp. 63,000.00
145 Coating Batu Alam Kg Rp. 67,500.00
146 Wood Filler Liter Rp. 31,500.00
147 Wood Stain Liter Rp. 63,000.00
148 Melamik Liter Rp. 58,500.00
149 Sealant @ 340 Gram Tube Rp. 63,000.00
150 Sealant Kg Rp. 189,000.00
151 Lem Kayu Kg Rp. 11,880.00
152 Lem Karpet / Vinyl Kg Rp. 54,000.00
153 Spirtus Liter Rp. 13,500.00
154 Minyak Cat Biasa Liter Rp. 11,250.00
155 Minyak Begesting Liter Rp. 10,800.00
156 Minyak Diesel Industri Ltr Rp. 9,000.00
157 Bensin Industri Ltr Rp. 9,000.00
158 Minyak Pelumas Ltr Rp. 40,500.00
167 Batu Candi m² Rp. 111,240.00
168 Batu Palimanan m² Rp. 135,000.00
169 Batu Lempeng m² Rp. 108,000.00
170 Batu Andesit m² Rp. 117,000.00
171 Batu Koral Sikat Kg Rp. 2,700.00
172 Beton Alur m² Rp. 72,000.00
173 Keramik Lantai 20 x 20 ( Polos ) m² Rp. 45,000.00
174 Keramik Lantai 20 x 20 ( Teksture ) m² Rp. 58,500.00
175 Keramik Lantai 25 x 25 ( Polos ) m² Rp. 54,000.00
176 Keramik Lantai 25 x 25 ( Teksture ) m² Rp. 63,000.00
177 Keramik Lantai 30 x 30 ( Polos ) m² Rp. 45,000.00
178 Keramik Lantai 30 x 30 ( Teksture ) m² Rp. 63,000.00
179 Keramik Lantai 40 x 40 ( Polos ) m² Rp. 42,480.00
180 Keramik Lantai 40 x 40 ( Teksture ) m² Rp. 54,000.00
181 Keramik Lantai 50 x 50 m² Rp. 56,250.00
No. Uraian Bahan Satuan Harga Satuan

181 Keramik Dinding 20 x 25 ( Motif ) m² Rp. 54,810.00


182 Keramik Dinding 25 x 40 ( Motif ) m² Rp. 54,810.00
183 Keramik Dinding 30 x 60 ( Motif ) m² Rp. 81,000.00
184 Plint Granit Uk. 10 x 30 Bh Rp. 10,800.00
185 Plint Granit Uk. 10 x 40 Bh Rp. 16,200.00
186 Plint Granit Uk. 10 x 60 Bh Rp. 21,600.00
187 Plint Marmer Uk. 10 x 30 Bh Rp. 18,000.00
188 Plint Marmer Uk. 10 x 40 Bh Rp. 22,500.00
189 Plint Marmer Uk. 10 x 60 Bh Rp. 36,000.00
190 Plint Keramik Uk. 10 x 30 Bh Rp. 9,000.00
191 Plint Keramik Uk. 10 x 20 Bh Rp. 3,600.00
192 Plint Keramik Uk. 5 x 20 Bh Rp. 4,500.00
193 Keramik Kolam Uk. 30 x 30 m² Rp. 90,000.00
194 Granit Tile Warna Terang m² Rp. 116,820.00
195 Granit Tile Warna Gelap m² Rp. 233,640.00
196 Conwood sun shade 3"(76x3050x14 mm) m² Rp. 253,316.25
197 Conwood Lap siding 8" (G2 200x3050x11 mm) m² Rp. 264,330.00
196 Marmer m² Rp. 155,925.00
197 Karpet m² Rp. 180,000.00
198 Under Layer ( Pelapis Bawah Karpet ) m² Rp. 67,500.00
199 Wall Paper Lebar 50 Cm m¹ Rp. 13,500.00
200 Lisplank GRC 0,9/20 m¹ Rp. 15,300.00
201 Lisplank GRC 0,9/30 m¹ Rp. 18,090.00
202 Kalsiboard Uk. 100 x 100 Tbl. 3.5 mm Lbr Rp. 16,200.00
203 Kalsiboard Uk. 120 x 240 Tbl. 3.5 mm Lbr Rp. 48,690.00
204 Kalsiboard Uk. 120 x 240 Tbl. 6 mm Lbr Rp. 135,000.00
205 Kalsiboard Uk. 120 x 240 Tbl. 10 mm Lbr Rp. 225,000.00
206 Gypsum Board Uk. 120 x 240 Lbr Rp. 56,520.00
207 List Kayu 2/4 m¹ Rp. 4,500.00
208 List Kayu Profil m¹ Rp. 7,200.00
209 List Gypsum m¹ Rp. 18,000.00
210 Trackstang Ø 12 mm m¹ Rp. 27,000.00
211 Wind Verband Ø 16 mm m¹ Rp. 45,000.00
212 Kawat Harmonika (40 x 40 x 2,1) mm m² Rp. 22,050.00
213 Kawat Kasa Aluminium m² Rp. 22,500.00
214 Back Drop m² Rp. 495,000.00
214 Paranet m² Rp. 12,600.00
215 Pintu Kamar Mandi PVC Unit Rp. 292,500.00
216 Pipa PVC 5/8 m¹ Rp. 2,700.00
217 Pipa PVC 1/2 Type AW m¹ Rp. 6,390.00
218 Pipa PVC 3/4 Type AW m¹ Rp. 6,300.00
219 Pipa PVC 1" Type AW m¹ Rp. 7,650.00
220 Pipa PVC 1 ½" Type AW m¹ Rp. 12,240.00
221 Pipa PVC 2" Type AW m¹ Rp. 18,720.00
222 Pipa PVC 2 ½" Type AW m¹ Rp. 36,000.00
223 Pipa PVC 3" Type AW m¹ Rp. 29,970.00
224 Pipa PVC 4" Type AW m¹ Rp. 45,630.00
225 Pipa 2" Type HDPE m¹ Rp. 45,000.00
226 Pipa PVC 3" Type D m¹ Rp. 24,750.00
No. Uraian Bahan Satuan Harga Satuan

227 Pipa PVC 4" Type D m¹ Rp. 39,690.00


228 Pipa Galvanis 1/2" Kelas B m¹ Rp. 27,000.00
229 Pipa Galvanis 3/4" Kelas B m¹ Rp. 36,000.00
230 Pipa Galvanis 1" Kelas B m¹ Rp. 45,000.00
231 Pipa Galvanis 1-1/4" Kelas B m¹ Rp. 54,000.00
232 Pipa Galvanis 1-1/2" Kelas B m¹ Rp. 67,500.00
233 Pipa Galvanis 2" Kelas B m¹ Rp. 81,000.00
234 Pipa Galvanis 2-1/2" Kelas B m¹ Rp. 117,000.00
235 Pipa Galvanis 3" Kelas B m¹ Rp. 144,000.00
236 Pipa Galvanis 4" Kelas B m¹ Rp. 225,000.00
237 Pipa Galvanis 6" Kelas B m¹ Rp. 315,000.00
238 Pipa PRN PN 20 Ø 3/4 " m¹ Rp. 97,020.00
239 Pipa PRN PN 20 Ø 1 " m¹ Rp. 52,020.00
240 Pipa PRN PN 20 Ø 1 " RISER m¹ Rp. 52,020.00
241 Pipa BS SCH 40 Ø 4" m¹ Rp. 272,430.00
242 Stop Kran Ø 2 1/2 " Bh Rp. 832,500.00
243 Pipa PPN PN 10 Ø 1 " m¹ Rp. 42,750.00
244 Pipa PPN PN 10 Ø 2 " m¹ Rp. 143,190.00
245 Kloset Duduk + Aksesories Bh Rp. 2,317,500.00
246 Kloset Jongkok Bh Rp. 148,320.00
247 Bathup ( Bak Mandi ) Porselin Bh Rp. 7,200,000.00
248 Bak Air Fiberglass Volume 1 m3 Bh Rp. 306,000.00
249 Wastafel Bh Rp. 400,500.00
250 Bak Cuci Piring Stainless Bh Rp. 270,000.00
251 Urinoir Bh Rp. 2,025,000.00
252 Kran Air Biasa Stainless Bh Rp. 72,000.00
253 Kran Air Leher Angsa Bh Rp. 97,200.00
254 Kran Air Panas Dingin / Mixer Kran Bh Rp. 315,000.00
255 Shower Mandi / Hand Shower Bh Rp. 90,000.00
256 Shower Closet / Spray Shower Bh Rp. 72,000.00
257 Avur Lantai Bh Rp. 18,000.00
258 Sprinkler Type Rotor Unit Rp. 45,000.00
259 Tandon Air Stainless Kapasitas 500 Liter Bh Rp. 1,530,000.00
260 Tandon Air Stainless Kapasitas 1000 Liter Bh Rp. 2,475,000.00
261 Jet Pump ( Grundforce ) Bh Rp. 2,700,000.00
262 Seal Tape Bh Rp. 3,150.00
263 Lampu LED 9 Watt Bh Rp. 26,100.00
264 Lampu LED 11 Watt Bh Rp. 67,500.00
265 Lampu SL/PL 8 Watt Bh Rp. 36,000.00
266 Lampu SL/PL 11 Watt Bh Rp. 41,400.00
267 Lampu SL/PL 18 Watt Bh Rp. 45,000.00
268 Lampu SL/PL 40 Watt Bh Rp. 108,000.00
269 Lampu Downlight 11 Watt Komplit Bh Rp. 112,500.00
270 Lampu Downlight 12 Watt Komplit Bh Rp. 139,500.00
271 Lampu Downlight Washer Led MR 16 Set Rp. 148,500.00
272 Lampu Spot Light LED 18 Watt Komplit Set Rp. 157,500.00
273 Lampu PendanLamp Set Rp. 337,500.00
274 Lampu Dinding Komplit Set Rp. 382,500.00
275 Lampu Floodlight IP65 Set Rp. 391,500.00
No. Uraian Bahan Satuan Harga Satuan

276 Lampu Indirect Led T5 (Strip) Set Rp. 12,150.00


273 Stop Kontak Bh Rp. 11,790.00
274 Saklar Tunggal Bh Rp. 9,720.00
275 Saklar Ganda Bh Rp. 12,960.00
276 Saklar Hotel Bh Rp. 21,600.00
277 Saklar Handle Bh Rp. 36,000.00
278 Kabel NYA 1 x 2,5 mm² m¹ Rp. 2,250.00
279 Kabel NYY 2 x 1,5 mm² m¹ Rp. 10,170.00
280 Kabel NYY 3 x 2,5 mm² m¹ Rp. 11,250.00
281 Kabel NYY 3 x 4 mm² m¹ Rp. 16,200.00
282 Kabel NYY 4 x 4 mm² m¹ Rp. 20,700.00
283 Kabel NYY 4 x 6 mm² m¹ Rp. 29,700.00
284 Kabel NYY 4 x 10 mm² m¹ Rp. 46,800.00
285 Kabel NYY 4 x 16 mm² m¹ Rp. 67,500.00
286 Kabel NYY 4 x 25 mm² m¹ Rp. 100,800.00
287 Kabel NYY 4 x 35 mm² m¹ Rp. 144,000.00
288 Kabel NYY 4 x 50 mm² m¹ Rp. 189,000.00
289 Kabel NYY 4 x 70 mm² m¹ Rp. 262,440.00
290 Kabel NYFGBY 4 x 6 mm² m¹ Rp. 55,800.00
291 Kabel BC 6 mm² m¹ Rp. 4,500.00
292 Kabel BC 10 mm² m¹ Rp. 6,300.00
293 Kabel BC 16 mm² m¹ Rp. 10,800.00
294 Kabel BC 25 mm² m¹ Rp. 16,200.00
295 Kabel BC 35 mm² m¹ Rp. 22,500.00
296 Kabel BC 50 mm² m¹ Rp. 31,500.00
297 Kabel BC 70 mm² m¹ Rp. 42,300.00
298 Kabel Twisted 4 x 70 mm² m¹ Rp. 76,500.00
299 Pipa Conduilt 5/8" Bh Rp. 9,000.00
300 Isolator Bh Rp. 2,700.00
301 Las Doof Bh Rp. 450.00
302 T dos PVC Bh Rp. 1,800.00
303 Fitting Lampu Bh Rp. 9,000.00
304 Box MCB Bh Rp. 29,250.00
305 MCCB NS Micrologic 5.1 320-800 A/3P/70ka Bh Rp. 13,050,000.00
306 MCCB 100, 125, 160, 200, 225, 250 A /3 P/25 kA Bh Rp. 861,300.00
307 MCCB 100, 125, 160, 200, 225, 250 A /3 P/18 kA Bh Rp. 777,600.00
308 MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100 A /3 P/30 kA Bh Rp. 512,100.00
309 MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100 A /3 P/18 kA Bh Rp. 404,100.00
310 MCCB 15, 20, 25, 30, 40, 50, 60, 75, 80, 100 A /3 P/10 kA Bh Rp. 336,600.00
311 MCCB 15, 20, 25, 30, 40, 50, 60 A /3 P/7,5 kA Bh Rp. 257,400.00
312 MCB 1, 2, 4, 6, 10, 16, 20A/3P/10 KA Bh Rp. 402,300.00
313 MCB 25, 32, 40A/3P/6 KA Bh Rp. 246,600.00
314 MCB 6, 10, 16, 20A/3P/6 KA Bh Rp. 227,250.00
315 MCB 25, 32, 40, 50, 63A/3P/4,5 KA Bh Rp. 389,250.00
316 MCB 6, 10, 16, 20A/3P/4,5 KA Bh Rp. 175,500.00
317 MCB 1, 2, 3, 6A/1P/10 KA Bh Rp. 225,000.00
318 MCB 25, 32, 40A/1P/6 KA Bh Rp. 180,000.00
319 MCB 2, 4, 6, 10, 16, 20A/1P/6 KA Bh Rp. 105,300.00
320 MCB 50, 63A/1P/4.5 KA Bh Rp. 160,200.00
No. Uraian Bahan Satuan Harga Satuan

321 MCB 2, 4, 6,10,16 ,20, 25, 32, 40A/1P/4.5 KA Bh Rp. 54,000.00


322 Timer Type RE11 RM MU Bh Rp. 823,500.00
323 AC 2 PK Ceilling Cassete Unit Rp. 18,000,000.00
324 AC 1/2 PK Split Wall Maunted Unit Rp. 2,700,000.00
325 AC 5 PK Ceilling Cassete Unit Rp. 22,050,000.00
325 AC 1/2 PK Split Wall Maunted Unit Rp. 2,700,000.00
326 AC 1 PK Split Wall Maunted Unit Rp. 3,150,000.00
327 AC 1,5 PK Split Wall Maunted Unit Rp. 3,600,000.00
328 AC 2 PK Split Wall Maunted Unit Rp. 5,850,000.00
329 Exhaust Fan 110 Cfm Ceiling Mounted Unit Rp. 405,000.00
330 Exhaust Fan 1000 Cfm Wall Mounted Unit Rp. 3,375,000.00
331 Exhaust Fan 2000 Cfm Wall Mounted Unit Rp. 3,690,000.00
332 Kabel ITC 2 x 2 x 0,6mm2 m¹ Rp. 9,000.00
333 MDF Telephone 40 Fair Unit Rp. 1,575,000.00
334 Terminal Box Telephone Bh Rp. 1,125,000.00
335 PABX 6 Line 16 Ext Unit Rp. 4,050,000.00
336 PABX 8 Line 100 Ext Unit Rp. 45,000,000.00
337 Socket Outlet Telephone Bh Rp. 63,000.00
338 Pesawat Telephone Standart Bh Rp. 900,000.00
339 Arester Pelindung Petir + Kabel Power + Grounding Bh Rp. 3,150,000.00
340 Swicth Hub Data 8 Port Unit Rp. 337,500.00
341 Swicth Hub Data 16 Port Unit Rp. 684,000.00
342 Socket Outlet Data RJ45 Inbow Bh Rp. 67,500.00
343 Kabel UTP CAT 6 UTP m¹ Rp. 3,600.00
344 Kabel Labeling m¹ Rp. 6,300.00
345 Indoor Fixed Dome Camera Unit Rp. 900,000.00
346 Indoor Fixed Camera Unit Rp. 675,000.00
347 Indoor Pan / Tilt / Zoom Camera Unit Rp. 1,440,000.00
348 Digital Video Recorder (DVR) 10 Channel/1 tera byte Unit Rp. 6,750,000.00
349 20" CRT Monitor Unit Rp. 4,950,000.00
350 24 VAC Power Supply Unit Rp. 1,215,000.00
351 Positioning Device Colroller Unit Rp. 6,030,000.00
352 Kabel RG 59 m¹ Rp. 10,800.00
353 10 Call Master Station Unit Rp. 5,400,000.00
354 20 Call Master Station Unit Rp. 10,800,000.00
355 30 Call Master Station Unit Rp. 16,200,000.00
356 40 Call Master Station Unit Rp. 21,600,000.00
357 Power supply c/w rectifier ( PS-2420 S ) Bh Rp. 315,000.00
358 Call Button u/ Bed ( NBR-8 A ) Bh Rp. 270,000.00
359 Receptacle for call button ( NBY-1 A ) Bh Rp. 202,500.00
360 Hand held call button witht plug Bh Rp. 207,000.00
361 Call Speaker, Sub station Ceiling Mounted Bh Rp. 495,000.00
362 Reset Button ( NAR-2 A ) Bh Rp. 180,000.00
363 Coridor Lamp ( NBY-4 A ) Bh Rp. 198,000.00
364 Bathroom pullcord u/ KM ( NBR-7 AS ) Bh Rp. 162,000.00
365 Antena UHV/VHF Unit Rp. 234,000.00
366 Boster 48 db Unit Rp. 387,000.00
367 Spliter 8 way Unit Rp. 225,000.00
368 Outlet TV Bh Rp. 76,500.00
No. Uraian Bahan Satuan Harga Satuan

369 Spliter 4 way Bh Rp. 234,000.00


370 Televisi LED 20 inc + support galvanis gantungan Bh Rp. 2,250,000.00
371 Kabel, Coaxial 5C-2V m¹ Rp. 2,700.00
372 Box Panel Listrik Uk. 40 x 30 x 20 Wall Mounted Unit Rp. 517,500.00
373 Box Panel Listrik Uk. 40 x 60 x 20 Wall Mounted Unit Rp. 828,000.00
374 Box Panel Listrik Uk. 60 x 80 x 20 Wall Mounted Unit Rp. 1,125,000.00
375 Box Panel Listrik Uk. 100 x 80 x 25 Wall Mounted Unit Rp. 2,250,000.00
376 Box Panel Listrik Uk. 120 x 80 x 25 Wall Mounted Unit Rp. 2,655,000.00
377 Box Panel Listrik Uk. 120 x 200 x 50 Standing Floor Unit Rp. 13,500,000.00
378 Box Hager 4 Group Unit Rp. 77,400.00
379 Box Hager 6 Group Unit Rp. 85,500.00
380 Box Hager 8 Group Unit Rp. 99,000.00
381 - Copper Tuber dia 7/8" m1 Rp. 326,106.00
382 - Copper Tuber dia 3/4" m1 Rp. 264,429.00
383 - Copper Tuber dia 5/8" m1 Rp. 216,414.00
384 - Copper Tuber dia 1/2" m1 Rp. 161,964.00
385 - Copper Tuber dia 3/8" m1 Rp. 115,236.00
386 - Copper Tuber Fitting m1 Rp. 6,827,040.00
387 Wall Outlet Oksigen Fress Sis Std Set Rp. 1,589,940.00
388 Wall Outlet Com Air Fress Sis Std Set Rp. 1,589,940.00
389 Wall Outlet Vacum Air Fress Sis Std Set Rp. 1,589,940.00
390 Shut Off Valve 3 Line Gas FRES (OAV)7/8" R2 unit Rp. 11,707,146.00
391 Digital Alarm 3 Line Gas FRES (OAV) R2 Unit Rp. 17,919,495.00
392 Ball Valve 3/4" Unit Rp. 775,764.00
393 Support & Material Consumable lot Rp. 23,065,515.00
394 Testing Commisioning lot Rp. 5,014,647.00
395 Bed head Type FRES-AA pjng 1,2 mtr (stop kontak 1, Saklar 1,Lampu 1 Set Rp. 3,415,698.00
396 Flowmeter Dewasa (for adult) 0-15 LPM+Humidifier 135 ml+Connector 02 Set Rp. 1,788,930.00
397 Lampu Indikator 3 warna (Telemekanic) + fuse Bh Rp. 90,000.00
398 Selector Switch, 7 posisi Bh Rp. 180,000.00
399 Ampere meter, Skala 400 A (GAE) Bh Rp. 351,000.00
400 Volt Meter AC 220 / 380 V (GAE) Bh Rp. 477,000.00
401 Cos φ meter Bh Rp. 405,000.00
402 Frequensi Meter 48-52 LED (GAE) Bh Rp. 787,500.00
403 kWH Meter 3 fasa Bh Rp. 900,000.00
404 CT 1000/5 Bh Rp. 1,800,000.00
405 CT 500/5 Bh Rp. 1,350,000.00
406 CT 100/5 Bh Rp. 900,000.00
407 PV Bh Rp. 4,050,000.00
408 Hz Bh Rp. 207,000.00
409 PFR 12 step Bh Rp. 9,000,000.00
410 PFR 10 step Bh Rp. 7,851,600.00
411 MC Bh Rp. 525,600.00
412 Arester 100 KA/4 Pole OBBO 1 bh Bh Rp. 3,780,000.00
413 Arester 15 KA/4 Pole OBBO 1 bh Bh Rp. 675,000.00
414 Timer Switch Bh Rp. 157,500.00
415 Lampu indikator pompa Bh Rp. 67,500.00
416 Tombol Push Button on - off Bh Rp. 51,300.00
417 Pilot Lamp Bh Rp. 18,450.00
No. Uraian Bahan Satuan Harga Satuan

418 ATS 2000 A Motorized Bh Rp. 42,750,000.00


419 Kontaktor Direct On Line Starter Bh Rp. 171,000.00
420 Selector Switch, Auto-Manual Bh Rp. 92,700.00
421 WLC ( Water Level Control ) Bh Rp. 1,980,000.00
422 Kapasitor Bank 600 KvaR 10 step, automatic Unit Rp. 55,800,000.00
423 Kapasitor Bank 75 kVAR (harmonik) Unit Rp. 6,975,000.00
485 Socket Pipa Bh Rp. 2,700.00
486 Head Penangkal Psa Bh Rp. 9,000,000.00
487 Head Penangkal Petir Non Radioaktif Radius 100 m Bh Rp. 6,750,000.00
488 Head Penangkal Petir Splitzen Tembaga Bh Rp. 450,000.00
489 Klem Pipa Bh Rp. 4,500.00
490 Dudukan Tiang Bh Rp. 315,000.00
491 Pipa Splitzen Tembaga 1 ½ " Ljr Rp. 81,000.00
492 Shock Pipa Bh Rp. 22,500.00
493 Lampu PJU LED 120 Watt BRP 372 Philip Unit Rp. 4,950,000.00
494 Lampu PJU LED 100 Watt IP65 Unit Rp. 1,530,000.00
495 Lampu BGP310 12 Watt Philip Unit Rp. 2,700,000.00
496 Lampu Taman BCP 150/15i Philip Unit Rp. 3,600,000.00
497 Lampu Sorot LED 350 Watt 220-240V Philip Unit Rp. 13,500,000.00
498 Tiang lampu PJU Oktagonal 9 meter Singgle Hot Dipped Galvanized Unit Rp. 6,570,000.00
499 Tiang lampu PJU Oktagonal 9 meter Double Hot Dipped Galvanized Unit Rp. 8,550,000.00
500 Tiang PJU Tinggi 9,5 m Singgle Parabola Unit Rp. 8,100,000.00
501 Tiang Listrik Beton Tinggi 9 m 200 daN Unit Rp. 9,000,000.00
502 Tiang Lampu Taman Tinggi 3 m Unit Rp. 2,250,000.00
503 Tiang Lampu Bulat Tinggi 14 meter Unit Rp. 12,600,000.00
504 Keranjang Pelindung Lampu Sorot Unit Rp. 270,000.00
505 Buis Beton U. 20 Bh Rp. 31,500.00
506 Buis Beton U. 30 Bh Rp. 40,500.00
507 Gorong - Gorong Ø 20 Cm Bh Rp. 57,600.00
508 Gorong - Gorong Ø 30 Cm Bh Rp. 67,500.00
509 Bungkak Atap Bh Rp. 67,500.00
510 Logo Kabupaten Ngawi Ls Rp. 1,800,000.00
512 Penambahan / Penyambungan Listrik Termasuk Perijinan Watt Rp. 1,530.00
513 Panel Listrik Komplit Unit Rp. 14,400,000.00
514 Relling Tangga m¹ Rp. 900,000.00
515 Pagar Pengaman Tinggi 90 Cm ( Hollow dan Kayu ) m¹ Rp. 900,000.00
516 Kanopi ( Kaca Tempered 12 mm Sandblasting Rangka Stainless ) m¹ Rp. 1,800,000.00
517 Penyambungan PDAM Ls Rp. 6,507,000.00
520 Profil Tank Stainless 2200 Liter + Dudukan Unit Rp. 9,000,000.00
521 Pompa Dorong / Pompa Booster Unit Rp. 1,440,000.00
522 - 50 Hz, 220 Volt -
523 - Head Max. 9 m, Daya Dorong 30 m -
524 - Kapasitas 30 Liter/ Menit -
525 - Diameter Pipa 1" -
526 Pompa Submersible Kecil Unit Rp. 5,400,000.00
527 - Daya 220/440 V -
528 - Power C ( Control Box ) -
529 - Head 38 m -
530 Kabel 4 x 0,75 mm m¹ Rp. 9,900.00
No. Uraian Bahan Satuan Harga Satuan

531 Kawat Selling 10 mm m¹ Rp. 27,000.00


532 Flow Meter 2" Bh Rp. 400,500.00
533 Elbow 1,5" Bh Rp. 59,400.00
534 Biaya Pembuatan Sumur Ls Rp. 9,000,000.00
535 Biaya Pemasangan Pompa Submersible Ls Rp. 450,000.00
536 Geotexstile m² Rp. 45,000.00
537 Geomembrane Tbl. 2 mm m² Rp. 112,500.00
538 Tanah Humus ( Taman ) m³ Rp. 117,000.00
539 Pupuk Kandang Zak Rp. 22,500.00
540 Pupuk NPK Kg Rp. 5,400.00
541 Insektisida Botol Rp. 72,000.00
542 Rumput Gajah Mini m² Rp. 22,500.00
543 Rumput Manila m² Rp. 13,500.00
544 Dadap Merah ( Erythrina Christagali ) Tinggi 3 - 4 m Btg Rp. 315,000.00
545 Trembesi ( Samanea Saman ) Tinggi 4 - 5 m Btg Rp. 630,000.00
546 Melati Jawa ( Tabebuia Chrysantha ) Tinggi 4 - 5 m Btg Rp. 720,000.00
547 Ketapang Kencana Tinggi 3 - 4 m Btg Rp. 540,000.00
548 Biola Cantik Tinggi 2 - 3 m Btg Rp. 675,000.00
549 Lantana Merah / Putih / Ungu Bh Rp. 3,600.00
550 Dollar Rambat Bh Rp. 22,500.00
551 Tanaman Semak Hias Teh - Tehan Bh Rp. 10,800.00
552 Palem Botol Bh Rp. 247,500.00
553 Lily Kuning Bh Rp. 3,150.00
554 Krokot Merah Bh Rp. 2,250.00
555 Bakung Air Mancur Bh Rp. 9,000.00
556 Kalitia Merah Putih Bh Rp. 9,000.00
557 Sabrina Kuning Bh Rp. 9,000.00
558 Brokoli Bh Rp. 9,000.00
559 Puring Bh Rp. 9,000.00
560 Star Blue Bh Rp. 9,000.00
561 Putri Salju Bh Rp. 9,000.00
562 Lili Paris Bh Rp. 2,250.00
563 Kiler 4 Macam Bh Rp. 6,750.00
564 Cemara Udang Bh Rp. 11,700,000.00
565 Pule Bh Rp. 7,200,000.00
566 Sikas Bh Rp. 900,000.00
567 Alexander Ungu Bh Rp. 3,150.00
568 Blue Den Bh Rp. 9,000.00
584 Septic Tank Bio Filter ( 5000 Liter, Kapasitas 30 Orang) Unit Rp. 15,750,000.00
585 U Ditch 40.50.120 Gandar 5 Ton Bh Rp. 423,000.00
586 Cover U Ditch 50.120 Gandar 5 Ton Bh Rp. 153,000.00
587 Box Culvert 150.150.120 Gandar 20 Ton Bh Rp. 6,750,000.00
588 Box Culvert 150.150.120 Gandar 20 Ton Bh Rp. 6,750,000.00
589 Pasang Kusen WPC m1 Rp. 99,000.00
590 Daun Pintu WPC uk.0,92x2,10 m2 Rp. 1,635,300.00
591 Finishing HPL Daun Pintu m2 Rp. 157,500.00
592 Pasang Raam Aluminium 30x30 mm m1 Rp. 76,680.00
593 Pasang Kisi-Kisi Aluminium Bh Rp. 67,500.00
594 Lapis Timbal m2 Rp. 585,000.00
No. Uraian Bahan Satuan Harga Satuan

595 Pek. Pasangan Relling Tangga Tinggi 90 Cm m1 Rp. 1,350,000.00


596 Pek. Tangga Monyet m2 Rp. 675,000.00
597 Pipa Tembaga Gas Medis 3/8" Ljr/6M Rp. 258,750.00
598 Pipa Tembaga Gas Medis 5/8" Ljr/6M Rp. 569,250.00
599 Pipa Tembaga Gas Medis 7/8" Ljr/6M Rp. 1,009,125.00
600 Pipa Tembaga Gas Medis 1/2" Ljr/6M Rp. 398,475.00
601 Pipa Tembaga Gas Medis 1 5/8" Ljr/6M Rp. 1,811,250.00
602 Pipa Schedule Sch 40 Diameter 1" Ljr/6M Rp. 147,487.50
603 Pipa Schedule Sch 40 Diameter 2 1/2" Ljr/6M Rp. 512,325.00
604 Pipa Schedule Sch 40 Diameter 3" Ljr/6M Rp. 667,575.00
605 Pipa Schedule Sch 40 Diameter 4" Ljr/6M Rp. 947,025.00
606 Pengeboran borepile ( dia.20-40 Cm) titik Rp. 84,150.00

, 2020
Dibuat Oleh :
Konsultan Perencana
PRADUITA ARCHITECTS

…................
-
Hit Volume 233

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan : Pembanguan Rumah
Pekerjaan : Pembanguan Rumah BU Diana
Lokasi : #NAME?
Sumber Dana : #NAME?
Tahun : #NAME?
Sub Pekerjaan : PEKERJAAN PERSIAPAN
PEKERJAAN TANAH
2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4

I PEKERJAAN PERSIAPAN
1 Pengukuran dan Pematokan Panjang x Jumlah
16.00 2.00 18.00 x 1.88 x 2.00 67.500
30.00 2.00 32.00 x 1.88 x 2.00 120.000

Volume 187.500 187.500

### Err:509 Panjang x Lebar x Jumlah


16.00 x 30.00 x 1.00 480.000

Volume 480.000 480.000

### Err:509 Panjang x Jumlah


1.00 x 1.00 1.000

Volume 1.000 1.000

### Err:509 Panjang x Lebar x Jumlah


5.00 x 3.00 x 1.00 15.000

Volume 15.000 15.000

B PEKERJAAN TANAH
1 Pek. Galian Tanah Biasa Panjang x Lebar x Tgg/Dlm x Jumlah

Footplat Type 1 ( FP1) 0.50 x 0.50 x 1.00 x 2.00 0.500

Volume 0.500 0.500

2 Pek. Urugan Tanah Kembali Vol. Galian x Koef.


0.50 x 0.25 0.125

Volume 0.125 0.130

3 Pek. Urugan Tanah Pilihan Dipadatkan Panjang x Lebar x Tgg/Dlm x Jumlah

Taman Belakang 0.50 x 0.50 x 0.30 x 2.00 0.150

Volume 0.150 0.150


Hit Volume 234

4 Pek. Urugan Pasir Bawah Pondasi Tbl. 10 Cm Panjang x Lebar x Tgg/Dlm x Jumlah

#REF! #REF! #REF! 0.80 0.05 #REF! #REF!


#REF! #REF! #REF! 0.80 0.05 #REF! #REF!

Volume #REF! #REF!


Hit Volume 235

5 Pek. Urugan Pasir Bawah Footplat Tbl. 10 Cm Panjang x Lebar x Tgg/Dlm x Jumlah
Footplat Type 1 ( FP1) 0.50 x 0.50 x 0.05 x 2.00 0.025
#REF! #REF! x #REF! x 0.05 x #REF! #REF!
#REF! #REF! x #REF! x 0.05 x #REF! #REF!
#REF! #REF! x #REF! x 0.05 x #REF! #REF!

Volume #REF! #REF!

### Err:509 Panjang x Lebar x Tgg/Dlm x Jumlah

Volume - -

7 Pengeboran borepile ( dia.20-40 Cm) Jumlah x Dalam x x Jumlah


Footplat Type 1 ( FP1) - x 6.00 x x 2.00 -

Volume - -
DOKUMEN NEGARA - SANGAT RAHASIA
Hit Volume 236

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan :
Pekerjaan :
Lokasi :
Sumber Dana :
Tahun :
Sub Pekerjaan :

2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4
Pekerjaan Lantai dan Pelapis Dinding Lantai 1
III PEKERJAAN LANTAI DAN PELAPIS DINDING
1 Pek. Rabatan Bawah Lantai Tbl. 10 Cm
a. Pek. Beton Mutu f'c = 9,8 MPa (K.125) Panjang x Lebar x Tinggi x Jumlah
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 2.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 0.07 x 1.00 Err:509

Volume Err:509 Err:509

b. Pek. Pembesian dengan Besi Wiremess M6 Panjang x Lebar x Berat/m2 x Jumlah


Wiremess M 6 Uk. 5,4 m x 2,1 m Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Berat 34.76 Per Lembar Err:509 Err:509 x Err:509 x 3.07 x 2.00 Err:509
Berat / m2 3.07 Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509
Err:509 Err:509 x Err:509 x 3.07 x 1.00 Err:509

Volume Err:509 Err:509


2 Pek. Rabatan Jalan Setapak Taman Tbl. 10 Cm
a. Pek. Beton Mutu f'c = 9,8 MPa (K.125) Panjang x Lebar x Tinggi x Jumlah
- 1.00 x 0.60 x 0.07 x 12.00 0.504
1.00 x 0.60 x 0.07 x 5.00 0.210

Volume 0.714 0.710

b. Pek. Pembesian dengan Besi Wiremess M6 Panjang x Lebar x Berat/m2 x Jumlah


Wiremess M 6 Uk. 5,4 m x 2,1 m - 1.00 x 0.60 x 3.07 x 12.00 22.070
Berat 34.76 Per Lembar 1.00 x 0.60 x 3.07 x 5.00 9.196
Berat / m2 3.07

Volume 31.266 31.270


3 Pas. Lantai Keramik 60x60 Panjang x Lebar x Jumlah
Ruang Keluarga 69.68 x 1.00 x 1.00 69.680
Carport 43.23 x 1.00 x 1.00 43.230

Volume 112.910 112.910

4 Pas.Keramik 20x20 Panjang x Lebar x Jumlah


13.35 x 1.00 x 1.00 13.350
14.70 x 1.00 x 1.00 14.700
2.90 x 1.00 x 1.00 2.900

Volume 30.950 30.950

5 Pas.Keramik 30x30 Panjang x Lebar x Jumlah


11.13 x 1.00 x 1.00 11.130
9.03 x 1.00 x 1.00 9.030
5.27 x 1.00 x 1.00 5.270
10.21 x 1.00 x 1.00 10.210
Jemur 4.60 x 1.00 x 1.00 4.600
Gudang 8.12 x 1.00 x 1.00 8.120
Toilet 8.97 x 1.00 x 1.00 8.970

Volume 57.330 57.330

5 Pas.Wood Composit panel Panjang x Lebar x Jumlah


36.98 x 1.00 x 1.00 36.980

Volume 36.980 36.980


Hit Volume 237

7 Pas.Batu Coral Sikat Panjang x Lebar x Jumlah


5.11 x 1.00 x 1.00 5.110
1.00 0.60 17.00 10.200

Volume 15.310 15.310

8 Tanam Rumput Gajah Mini Panjang x Lebar x Jumlah


1.70 x 1.00 x 1.00 1.700

Volume 1.700 1.700

9 Pas.Mozaik 10x10 cm Panjang x Lebar x Jumlah


25.95 x 1.65 x 1.00 42.818
9.60 x 3.38 x 1.00 32.400

Volume 75.218 75.220

10 Pas.Keramik 50x50 Panjang x Lebar x Jumlah


9.00 x 5.00 x 1.00 45.000

Volume 45.000 45.000

11 Pas.Kayu Jati Solid Fin Melamik Panjang x Lebar x Jumlah


0.30 x 1.00 x 25.00 7.500
0.30 x 1.00 x 25.00 7.500

Volume 15.000
11 Pas. Keramik Dinding Uk. 30 x 60 Panjang x Tinggi x Jlm Sisi x Jumlah
- 5.50 x 3.00 x 1.00 x 1.00 16.500
5.98 x 3.00 x 1.00 x 1.00 17.940
5.00 x 3.00 x 1.00 x 1.00 15.000
7.45 x 3.00 x 1.00 x 1.00 22.350
8.80 x 3.00 x 1.00 x 1.00 26.400

Volume 98.190 98.190


12 Pas.batu Bali Green Panjang x Tinggi x Jlm Sisi x Jumlah 0.000
- 7.48 x 1.00 x 1.00 x 1.00 7.480
12.10 x 1.00 x 1.00 x 1.00 12.100
20.47 x 1.00 x 1.00 x 1.00 20.470
23.30 x 1.00 x 1.00 x 1.00 23.300

Volume 63.350
12 Pas. Lantai Parquet Kayu jati Panjang x Tinggi x Jlm Sisi x Jumlah
KmTamu 7.28 x 1.00 x 1.00 x 1.00 7.280
Km Anak 9.70 x 1.00 x 1.00 x 1.00 9.700

Volume 16.980 16.980

Pekerjaan Lantai dan Pelapis Dinding Lantai 2


1 Pas. Lantai Parquet Kayu jati Panjang x Lebar x Jumlah
11.16 x 1.00 x 1.00 11.160
19.63 x 1.00 x 1.00 19.630
9.71 x 1.00 x 1.00 9.710

Volume 40.500 40.500

2 Pas. Lantai Keramik 60x60 Panjang x Lebar x Jumlah


26.96 x 1.00 x 1.00 26.960

Volume 26.960 26.960

3 Pas.Keramik 30x30 Panjang x Lebar x Jumlah


13.01 x 1.00 x 1.00 13.010

Volume 13.010 13.010

4 Pas.Keramik 50x50 Panjang x Lebar x Jumlah


10.80 x 1.00 x 1.00 10.800

Volume 10.800 10.800

IV PEKERJAAN LANGIT - LANGIT

1 Pas. Rangka Plafond Hollow Zincromate Panjang x Lebar x Jumlah


Gypsumboard 212.90 x 1.00 x 1.00 212.900
212.900
Lamberzering 6.43 x 1.00 x 1.00 6.430
6.51 x 1.00 x 1.00 6.510
3.35 x 1.00 x 1.00 3.350
21.18 x 1.00 x 1.00 21.180
37.470

Volume 250.370 250.370

2 Pas. Plafond Gypsum Board Tbl 9 mm Volume


Volume Rangka Plafond 212.90 212.900
Hit Volume 238

Volume 212.900 212.900

3 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm Volume


Volume Rangka Plafond 37.47 37.470

Volume 37.470 37.470

4 Pas. List Plafond Gypsum Panjang x Jml/Sekmen x Jumlah


23.19 x - x 1.00 -
74.50 x - x 1.00 -
7.02 x - x 1.00 -
6.70 x - x 1.00 -
11.34 x - x 1.00 -
4.27 x - x 1.00 -
11.15 x - x 1.00 -
9.84 x - x 1.00 -
8.90 x - x 1.00 -
6.24 x - x 2.00 -
21.46 x - x 1.00 -

Volume - 0.000

b. Pekerjaan Langit-Langit Lantai 2

1 Pas. Rangka Plafond Hollow Zincromate Luas x Lebar x Jumlah


- 330.11 x 1.00 x 1.00 330.110
373.42 x 1.00 x 1.00 373.420
59.62 x 1.00 x 1.00 59.620

763.150
Lamberzering 9.64 x 1.00 x 1.00 9.640
5.64 x 1.00 x 1.00 5.640
64.62 x 1.00 x 1.00 64.620
3.35 x 1.00 x 1.00 3.350
3.35 x 1.00 x 1.00 3.350
10.07 x 1.00 x 1.00 10.070
96.670

Volume 859.820 859.820

2 Pas. Plafond Gypsum Board Tbl 9 mm Volume


Volume Rangka Plafond 763.15 763.150

Volume 763.150 763.150

3 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm Volume


Volume Rangka Plafond 96.67 96.670

Volume 96.670 96.670

4 Pas. List Plafond Gypsum Panjang x Jml/Sekmen x Jumlah


Vertikal 20.90 x - x 1.00 -
14.89 x - x 1.00 -
33.10 x - x 1.00 -
18.40 x - x 1.00 -
12.13 x - x 1.00 -
21.25 x - x 2.00 -
10.52 x - x 2.00 -
12.45 x - x 1.00 -

Volume - 0.000

c. Pekerjaan Langit-Langit Lantai Atap

1 Pas. Rangka Plafond Hollow Zincromate Luas x Lebar x Jumlah


23.45 x 1.00 x 2.00 46.900

46.900

Volume 46.900 46.900

2 Pasang Langit - Langit Lambriziring Kayu Jati Tbl 9 mm Volume


Volume Rangka Plafond 46.90 46.900

Volume 46.900 46.900

3 Pas. List Plafond Gypsum Panjang x Jml/Sekmen x Jumlah


Vertikal 23.45 x 2.00 x - -
- x 2.00 x 2.00 -

Volume - 0.000
Hit Volume 239

DOKUMEN NEGARA - SANGAT RAHASIA


Hit Volume 240

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan :
Pekerjaan :
Lokasi :
Sumber Dana :
Tahun :
Sub Pekerjaan :

2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4

I PEKERJAAN PASANGAN/PLESTERAN
1 Pas. Pondasi Batu Belah Camp. 1 PC : 5 Ps Panjang x Lbr Rata2 x Tinggi x Jumlah
0.60 0.30 Err:509 Err:509 x 0.45 x 0.60 x 1.00 Err:509
0.60 0.30 Err:509 Err:509 x 0.45 x 0.60 x 1.00 Err:509

Volume Err:509 Err:509

2 Pasang Batu Kosongan ( Aanstampeng )


Panjang x Lbr Rata2 x Tinggi x Jumlah
0.60 0.30 Err:509 Err:509 x 0.45 x 0.20 x 1.00 Err:509
0.60 0.30 Err:509 Err:509 x 0.45 x 0.20 x 1.00 Err:509

Volume Err:509 Err:509

3 Pas. Pondasi Rollag Bata Merah Camp. 1 PC : 3 Ps Panjang x Lbr Rata2 x Tinggi x Jumlah
Teras Depan 9.00 x 0.30 x 0.50 x 2.00 2.700
10.70 x 0.30 x 0.70 x 1.00 2.247
Teras Belakang 4.15 x 0.30 x 0.50 x 1.00 0.623
18.70 x 0.30 x 0.70 x 1.00 3.927

Teras Depan 11.95 x 0.30 x 0.30 x 2.00 2.151

Volume 11.648 11.650

4 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 3 Ps Panjang x Tinggi x Jumlah
Horizontal Lantai 1 13.00 x 0.50 x 1.00 6.500
5.00 x 0.50 x 1.00 2.500
10.00 x 0.50 x 1.00 5.000
2.00 x 0.50 x 1.00 1.000
10.00 x 0.50 x 2.00 10.000
10.00 x 0.50 x 1.00 5.000
12.60 x 0.50 x 1.00 6.300
11.00 x 0.50 x 1.00 5.500
- x 0.50 x - -
11.25 x 0.50 x 1.00 5.625
13.00 0.50 x 2.00 13.000
2.75 x 0.50 x 1.00 1.375
3.00 x 0.50 x 1.00 1.500
6.25 x 0.50 x 1.00 3.125
x
Cek x
x
Pengurangan x
Pasang Pintu Type 1 (PU) 2.60 x 1.40 x (1.00) (3.640)
Pasang Pintu Type 1 ( P1 ) 1.00 x 2.60 x (3.00) (7.800)
Pasang Pintu Type 2 ( P2 ) 0.80 x 2.60 x (9.00) (18.720)

Pasang Pintu TypePS( PS1 ) 2.80 x 2.60 x (1.00) (7.280)


Pasang Pintu TypePS( PS2 ) 3.35 x 2.60 x (1.00) (8.710)

Pasang Jendela Type 1 ( J1 ) 2.60 x 0.70 x (1.00) (1.820)


Pasang Jendela Type 2 ( J2 ) 1.75 x 2.00 x (1.00) (3.500)
Pasang Jendela Type 3 ( J3 ) 1.75 x 2.00 x (1.00) (3.500)
Pasang Jendela Type 4 ( J4 ) 1.00 x 2.63 x (2.00) (5.254)
Pasang Jendela Type5 ( J5 ) 2.00 x 0.85 x (3.00) (5.100)
Pasang Jendela Type6 ( J6 ) 1.30 x 0.78 x (4.00) (4.030)

Pasang Jendela Type bv1 ( BV1 ) 0.70 x 0.70 x (1.00) (0.490)


Pasang Jendela Type bv2 ( BV2 ) 0.60 x 1.80 x (1.00) (1.080)

Volume (4.499) (4.500)

5 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 6 Ps Panjang x Tinggi x Jumlah
Horizontal Lantai 1 13.00 x 4.00 x 1.00 52.000
5.00 x 4.00 x 1.00 20.000
10.00 x 4.00 x 1.00 40.000
2.00 x 4.00 x 1.00 8.000
10.00 x 4.00 x 2.00 80.000
10.00 x 4.00 x 1.00 40.000
12.60 x 4.00 x 1.00 50.400
11.00 x 4.00 x 1.00 44.000

11.25 x 4.00 x 1.00 45.000


13.00 x 4.00 x 2.00 104.000
2.75 x 4.00 x 1.00 11.000
3.00 x 4.00 x 1.00 12.000
6.25 x 4.00 x 1.00 25.000
Cek
Hit Volume 241

2.60 x 1.30 x (1.00) (3.380)


1.00 x 2.60 x (1.00) (2.600)
0.80 x 2.60 x (1.00) (2.080)
- x 2.60 x (7.00) -
2.80 x 2.60 x (1.00) (7.280)
3.35 x 2.60 x (1.00) (8.710)
- x 3.00 x (2.00) -
2.60 x 2.60 x (1.00) (6.760)
1.75 x 3.60 x (1.00) (6.300)
1.75 x - x - -
1.00 x 3.00 x (2.00) (6.000)
2.00 x 2.60 x (3.00) (15.600)
1.30 x 1.70 x (4.00) (8.840)
- x 2.15 x (1.00) -
- x 0.50 x (2.00) -
0.70 x 2.55 x - -
0.60 x 0.80 x - -
- x 0.70 x - -
- x 0.70 x - -

Volume 463.850 463.850

6 Pek. Plesteran Camp. 1 PC : 3 Ps Tbl. 15 mm Panjang x Tinggi x Jml Sisi x Jumlah


Horizontal Lantai 1 13.00 x 0.50 x 2.00 x 1.00 13.000
5.00 x 0.50 x 2.00 x 1.00 5.000
10.00 x 0.50 x 2.00 x 1.00 10.000
2.00 x 0.50 x 2.00 x 1.00 2.000
10.00 x 0.50 x 2.00 x 2.00 20.000
10.00 x 0.50 x 2.00 x 1.00 10.000
12.60 x 0.50 x 2.00 x 1.00 12.600
11.00 x 0.50 x 2.00 x 1.00 11.000
- x 0.50 x 2.00 x - -
11.25 x 0.50 x 2.00 x 1.00 11.250
13.00 x 0.50 x 2.00 x 2.00 26.000
2.75 x 0.50 x 2.00 x 1.00 2.750
3.00 x 0.50 x 2.00 x 1.00 3.000
6.25 x 0.50 x 2.00 x 1.00 6.250
Pasang Jendela Type 1 ( J1 ) 2.60 x x x (1.00) -

Pasang Jendela Type 2 ( J2 )


Pasang Jendela Type 3 ( J3 ) 1.75 x 2.00 x 2.00 x (1.00) (7.000)
Pasang Jendela Type 4 ( J4 ) 1.00 x 2.63 x 2.00 x (2.00) (10.508)
Pasang Jendela Type5 ( J5 ) 2.00 x 0.85 x 2.00 x (3.00) (10.200)
Pasang Jendela Type6 ( J6 ) 1.30 x 0.78 x 2.00 x (4.00) (8.060)
- - x - x 2.00 x - -
- - x - x 2.00 x - -
Pasang Jendela Type bv1 ( BV1 ) 0.70 x 0.70 x 2.00 x (1.00) (0.980)
Pasang Jendela Type bv2 ( BV2 ) 0.60 x 1.80 x 2.00 x (1.00) (2.160)
- - x - x 2.00 x - -

Volume 93.942 93.940

7 Pek. Plesteran Camp. 1 PC : 6 Ps Tbl. 15 mm Tinggi x Keliling x Jumlah


Kolom 40 x 40 4.00 x 1.60 x 54.00 345.600
Kolom 15 x 15 4.00 x 0.60 x 70.00 168.000

Tangga Kiri 3.30 x 1.63 x 1.00 5.379


3.30 x 1.63 x 1.00 5.379
3.25 x 1.43 x 1.00 4.648
Tangga Kanan 3.30 x 1.63 x 1.00 5.379
3.30 x 1.63 x 1.00 5.379
3.25 x 1.43 x 1.00 4.648

Volume 544.411 544.410


Hit Volume 242

8 Pek. Plesteran Skoning / Benangan Camp. 1 PC : 3 Ps Panjang x Jml Sisi x Jumlah


2.60 1.00 1.40 1.00 Pasang Pintu Type 1 (PU) 4.00 x 2.00 x 1.00 8.000
1.00 1.00 2.60 2.00 Pasang Pintu Type 1 ( P1 ) 6.20 x 2.00 x 6.00 74.400
0.80 1.00 2.60 2.00 Pasang Pintu Type 2 ( P2 ) 6.00 x 2.00 x 7.00 84.000

2.80 1.00 2.60 2.00 Pasang Pintu TypePS( PS1 ) 8.00 x 2.00 x 1.00 16.000
3.35 1.00 2.60 2.00 Pasang Pintu TypePS( PS2 ) 8.55 x 2.00 x - -

2.60 2.00 0.70 2.00 Pasang Jendela Type 1 ( J1 ) 6.60 x 2.00 x 2.00 26.400
1.75 2.00 2.00 2.00 Pasang Jendela Type 2 ( J2 ) 7.50 x 2.00 x 1.00 15.000
1.75 2.00 2.00 2.00 Pasang Jendela Type 3 ( J3 ) 7.50 x 2.00 x 1.00 15.000
1.00 2.00 2.63 2.00 Pasang Jendela Type 4 ( J4 ) 7.25 x 2.00 x 1.00 14.508
2.00 2.00 0.85 2.00 Pasang Jendela Type5 ( J5 ) 5.70 x 2.00 x - -
1.30 2.00 0.78 2.00 Pasang Jendela Type6 ( J6 ) 4.15 x 2.00 x - -

0.70 2.00 0.70 2.00 ng Jendela Type bv1 ( BV1 ) 2.80 x 2.00 x 4.00 22.400
0.60 2.00 1.80 2.00 ng Jendela Type bv2 ( BV2 ) 4.80 x 2.00 x 1.00 9.600

Volume 285.308 285.310

b. Pekerjaan Pasangan Lantai 2


1 Pas. Dinding Bata Merah (5x11x22) Cm Tebal 1/2 Bata Camp. 1 PC : 3 Ps Panjang x Tinggi x Jumlah
Hit Volume 243

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan : Pembanguan Rumah
Pekerjaan : Pembanguan Rumah BU Diana
Lokasi : #NAME?
Sumber Dana : #NAME?
Tahun : #NAME?
Sub Pekerjaan : PEKERJAAN BETON
4.00
4.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4

III PEKERJAAN BETON


Volume - -

1 Pek. Lantai Kerja Tbl. 7 Cm


a. Pek. Beton Mutu f'c = 7,4 MPa (K.100) Panjang x Lebar x Dalam x Jumlah
Footplat Type 1 ( FP1) 0.50 x 0.50 x 0.07 x 2.00 0.035

Volume 0.035 0.035

2 Pek. Footplat Uk. 80 x 80 x 25 ( Type FP1 )


a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tebal x Jumlah
0.50 x 0.50 x 0.25 x 2.00 0.125

Volume 0.125 0.125

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.45 - 0.05 Tul. Bawah 0.50 0.15 0.55 x 4.00 x 1.04 x 2.00 4.618
13 0.45 - 0.05 0.50 0.15 0.55 x 4.00 x 1.04 x 2.00 4.618

Volume 9.235 9.235

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.45 0.20 0.05 Tul. Atas 0.50 0.15 0.95 x 4.00 x 1.04 x 2.00 7.952
13 0.45 0.20 0.05 0.50 0.15 0.95 x 4.00 x 1.04 x 2.00 7.952

Volume 15.903 15.903

d. Pek. Begesting Pondasi ( 2X Pakai ) Keliling x Tinggi / Pemakaian x Jumlah


0.50 2.00 0.50 2.00 2.00 x 0.25 / 4.00 x 2.00 0.250

Volume 0.250 0.250

### Err:509
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tebal x Jumlah
#REF! x #REF! x 0.30 x #REF! #REF!

Volume #REF! #REF!

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m¹ x Jumlah


13 #REF! - 0.05 Tul. Bawah #REF! 0.15 #REF! x #REF! x 1.04 x #REF! #REF!
13 #REF! - 0.05 #REF! 0.15 #REF! x #REF! x 1.04 x #REF! #REF!

Volume #REF! #REF!

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m¹ x Jumlah


13 #REF! 0.25 0.05 Tul. Atas #REF! 0.15 #REF! x #REF! x 1.04 x #REF! #REF!
13 #REF! 0.25 0.05 #REF! 0.15 #REF! x #REF! x 1.04 x #REF! #REF!

Volume #REF! #REF!

d. Pek. Begesting Pondasi ( 2X Pakai ) Keliling x Tinggi / Pemakaian x Jumlah


#REF! 2.00 #REF! 2.00 #REF! x 0.30 / 4.00 x #REF! #REF!

Volume #REF! #REF!

### Err:509
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tebal x Jumlah
0.60 x 0.60 x 0.25 x Err:509 Err:509

Volume Err:509 Err:509

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.55 - 0.05 Tul. Bawah 0.60 0.15 0.65 x 4.00 x 1.04 x Err:509 Err:509
13 0.55 - 0.05 0.60 0.15 0.65 x 4.00 x 1.04 x Err:509 Err:509

Volume Err:509 Err:509

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.55 0.20 0.05 Tul. Atas 0.60 0.15 1.05 x 4.00 x 1.04 x Err:509 Err:509
13 0.55 0.20 0.05 0.60 0.15 1.05 x 4.00 x 1.04 x Err:509 Err:509

Volume Err:509 Err:509

d. Pek. Begesting Pondasi ( 2X Pakai ) Keliling x Tinggi / Pemakaian x Jumlah


0.60 2.00 0.60 2.00 2.40 x 0.25 / 4.00 x Err:509 Err:509

Volume Err:509 Err:509

### Err:509
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tebal x Jumlah
0.60 x 0.60 x 0.25 x Err:509 Err:509

Volume Err:509 Err:509

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.55 - 0.05 Tul. Bawah 0.60 0.15 0.65 x 4.00 x 1.04 x Err:509 Err:509
13 0.55 - 0.05 0.60 0.15 0.65 x 4.00 x 1.04 x Err:509 Err:509

Volume Err:509 Err:509

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m¹ x Jumlah


13 0.55 0.20 0.05 Tul. Atas 0.60 0.15 1.05 x 4.00 x 1.04 x Err:509 Err:509
13 0.55 0.20 0.05 0.60 0.15 1.05 x 4.00 x 1.04 x Err:509 Err:509

Volume Err:509 Err:509

d. Pek. Begesting Pondasi ( 2X Pakai ) Keliling x Tinggi / Pemakaian x Jumlah


0.60 2.00 0.60 2.00 2.40 x 0.25 / 4.00 x Err:509 Err:509

Volume Err:509 Err:509


Hit Volume 244

3 Pek. Beton Kolom Pedestal Uk.20 x 20 ( Type K1 0.20 0.20


a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Tinggi x Dimensi Kolom x Jumlah
Footplat Type 1 ( FP1) 3.00 1.50 x 0.20 x 0.20 x 2.00 0.120
-
Panjang Total (m) = 3.00 0.16 0.16 0.05 P. Beugel = 0.74 Volume 0.120 0.120

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m


0 - 1.00 3.00 x - x - -
0 4.00 1.00 3.00 x 4.00 x - -
8 Tulangan Tumpuan 0.40 3.00 0.10 0.74 x 12.00 x 0.39 3.504
8 Tulangan Lapangan 0.60 3.00 0.15 0.74 x 12.00 x 0.39 3.504

Volume 7.007 7.007

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m


13 6.00 1.00 3.00 x 6.00 x 1.04 18.754
0 - 1.00 3.00 x - x - -
0 Tulangan Tumpuan 0.40 3.00 0.15 0.74 x 8.00 x - -
0 Tulangan Lapangan 0.60 3.00 0.15 0.74 x 12.00 x - -

Volume 18.754 18.754

d. Pek. Begesting Kolom ( 4X Pakai ) Panjang x Lebar / Pemakaian


0.20 2.00 0.20 2.00 3.00 x 0.80 / 4.00 0.600
Hit Volume 245

Volume 0.600 0.600

### Err:509 0.15 0.30


Err:509 Panjang x Lebar x Tinggi x Jumlah
H 13.00 13.00 x 0.15 x 0.30 x 1.00 0.585
H 5.00 5.00 x 0.15 x 0.30 x 1.00 0.225
H 10.00 10.00 x 0.15 x 0.30 x 1.00 0.450
H 2.00 2.00 x 0.15 x 0.30 x 1.00 0.090
H 20.00 10.00 x 0.15 x 0.30 x 2.00 0.900
H 10.00 10.00 x 0.15 x 0.30 x 1.00 0.450
H 12.60 12.60 x 0.15 x 0.30 x 1.00 0.567
H 11.00 11.00 x 0.15 x 0.30 x 1.00 0.495

V 11.25 11.25 x 0.15 x 0.30 x 1.00 0.506


V 26.00 13.00 x 0.15 x 0.30 x 2.00 1.170
V 2.75 2.75 x 0.15 x 0.30 x 1.00 0.124
V 3.00 3.00 x 0.15 x 0.30 x 1.00 0.135
V 6.25 6.25 x 0.15 x 0.30 x 1.00 0.281

Panjang Total (m) = 132.85 0.11 0.26 0.05 P. Beugel = 0.84 Volume 5.978 5.978

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 132.85 x - x - -
10 2.00 1.00 132.85 x 2.00 x 0.62 163.804
8 Tulangan Tumpuan 0.40 132.85 0.15 0.84 x 354.00 x 0.39 117.326
8 Tulangan Lapangan 0.60 132.85 0.15 0.84 x 531.00 x 0.39 175.990

Volume 457.120 457.120

Err:509 Panjang x Jumlah x Berat/m


13 4.00 1.00 132.85 x 4.00 x 1.04 553.658
0 4.00 1.00 132.85 x 4.00 x - -
0 Tulangan Tumpuan 0.40 132.85 0.15 0.84 x 354.00 x - -
0 Tulangan Lapangan 0.60 132.85 0.15 0.84 x 531.00 x - -

Volume 553.658 553.658

Err:509 Panjang x Lebar / Pemakaian


0.15 - 0.30 2.00 132.85 x 0.60 / 4.00 19.928

Volume 19.928 19.928

### Err:509 0.15 0.20


Err:509 Panjang x Lebar x Tinggi x Jumlah
Taman 12.60 12.60 x 0.15 x 0.20 x 1.00 0.378
Gazebo 11.00 11.00 x 0.15 x 0.20 x 1.00 0.330
H 39.00 13.00 x 0.15 x 0.20 x 3.00 1.170
H 4.00 2.00 x 0.15 x 0.20 x 2.00 0.120
H 18.00 9.00 x 0.15 x 0.20 x 2.00 0.540
H 12.50 6.25 x 0.15 x 0.20 x 2.00 0.375
H 1.75 1.75 x 0.15 x 0.20 x 1.00 0.053
H 6.25 6.25 x 0.15 x 0.20 x 1.00 0.188
H 10.00 10.00 x 0.15 x 0.20 x 1.00 0.300

V 28.00 28.00 x 0.15 x 0.20 x 1.00 0.840


V 60.00 30.00 x 0.15 x 0.20 x 2.00 1.800
V 4.10 4.10 x 0.15 x 0.20 x 1.00 0.123
V 20.00 10.00 x 0.15 x 0.20 x 2.00 0.600
V 14.00 7.00 x 0.15 x 0.20 x 2.00 0.420
V 4.00 2.00 x 0.15 x 0.20 x 2.00 0.120
V 4.50 2.25 x 0.15 x 0.20 x 2.00 0.135
V 8.00 4.00 x 0.15 x 0.20 x 2.00 0.240
V 10.00 10.00 x 0.15 x 0.20 x 1.00 0.300
V 10.00 10.00 x 0.15 x 0.20 x 1.00 0.300
V 16.00 8.00 x 0.15 x 0.20 x 2.00 0.480

Panjang Total (m) = 293.70 0.11 0.16 0.04 P. Beugel = 0.62 Volume 8.811 8.811

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 293.70 x - x - -
10 4.00 1.00 293.70 x 4.00 x 0.62 724.264
6 Tulangan Tumpuan 0.40 293.70 0.15 0.62 x 783.00 x 0.22 107.743
6 Tulangan Lapangan 0.60 293.70 0.15 0.62 x 1,175.00 x 0.22 161.683

Volume 993.690 993.691

Err:509 Panjang x Jumlah x Berat/m


0 6.00 1.00 293.70 x 6.00 x - -
0 - 1.00 293.70 x - x - -
0 Tulangan Tumpuan 0.40 293.70 0.15 0.62 x 783.00 x - -
0 Tulangan Lapangan 0.60 293.70 0.15 0.62 x 1,175.00 x - -

Volume - -

Err:509 Panjang x Lebar / Pemakaian


0.15 - 0.20 2.00 293.70 x 0.40 / 2.00 58.740

Volume 58.740 58.740


Hit Volume 246

4 Pek. Beton Kolom Uk. 20 x 20 ( Type K1 ) 0.20 0.20


a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Tinggi x Dimensi Kolom x Jumlah
16.80 4.20 x 0.20 x 0.20 x 4.00 0.672

-
Panjang Total (m) = 16.80 0.16 0.16 0.05 P. Beugel = 0.74 Volume 0.672 0.672

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m


0 - 1.00 16.80 x - x - -
0 4.00 1.00 16.80 x 4.00 x - -
8 Tulangan Tumpuan 0.40 16.80 0.15 0.74 x 45.00 x 0.39 13.139
8 Tulangan Lapangan 0.60 16.80 0.15 0.74 x 67.00 x 0.39 19.562

Volume 32.701 32.701

c. Pek. Pembesian Dengan Besi Ulir Panjang x Jumlah x Berat/m


13 6.00 1.00 16.80 x 6.00 x 1.04 105.022
0 - 1.00 16.80 x - x - -
0 Tulangan Tumpuan 0.40 16.80 0.15 0.74 x 45.00 x - -
0 Tulangan Lapangan 0.60 16.80 0.15 0.74 x 67.00 x - -

Volume 105.022 105.022

d. Pek. Begesting Kolom ( 4X Pakai ) Panjang x Lebar / Pemakaian


0.20 2.00 0.20 2.00 16.80 x 0.80 / 4.00 3.360

Volume 3.360 3.360

### Err:509 0.30 0.30


Err:509 Tinggi x Dimensi Kolom x Jumlah
5.15 5.15 x 0.30 x 0.30 x 1.00 0.464

-
Panjang Total (m) = 5.15 0.26 0.26 0.05 P. Beugel = 1.14 Volume 0.464 0.464

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 5.15 x - x - -
0 4.00 1.00 5.15 x 4.00 x - -
8 Tulangan Tumpuan 0.40 5.15 0.15 1.14 x 14.00 x 0.39 6.297
8 Tulangan Lapangan 0.60 5.15 0.15 1.14 x 21.00 x 0.39 9.446

Volume 15.743 15.743

Err:509 Panjang x Jumlah x Berat/m


13 8.00 1.00 5.15 x 8.00 x 1.04 42.926
0 - 1.00 5.15 x - x - -
0 Tulangan Tumpuan 0.40 5.15 0.15 1.14 x 14.00 x - -
0 Tulangan Lapangan 0.60 5.15 0.15 1.14 x 21.00 x - -

Volume 42.926 42.926

Err:509 Panjang x Lebar / Pemakaian


0.30 2.00 0.30 2.00 5.15 x 1.20 / 4.00 1.545

Volume 1.545 1.545


### Err:509 0.15 0.15
Err:509 Tinggi x Dimensi Kolom x Jumlah
51.50 5.15 x 0.15 x 0.15 x 10.00 1.159
171.10 2.90 x 0.15 x 0.15 x 59.00 3.850

Panjang Total (m) = 222.60 0.11 0.11 0.04 P. Beugel = 0.52 Volume 5.009 5.009

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 222.60 x - x - -
10 4.00 1.00 222.60 x 4.00 x 0.62 548.932
6 Tulangan Tumpuan 0.40 222.60 0.15 0.52 x 594.00 x 0.22 68.553
6 Tulangan Lapangan 0.60 222.60 0.15 0.52 x 890.00 x 0.22 102.714

Volume 720.198 720.198

Err:509 Panjang x Lebar / Pemakaian


0.15 - 0.15 2.00 222.60 x 0.30 / 4.00 16.695

Volume 16.695 16.695


5 Pek. Balok Latai Uk. 15 x 15 ( Type BL ) toc +2,7 0.15 0.15
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tinggi x Jumlah
4.00 2.00 x 0.15 x 0.15 x 2.00 0.090

Panjang Total (m) = 4.00 0.11 0.11 0.04 P. Beugel = 0.52 Volume 0.090 0.090

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m


0 - 1.00 4.00 x - x - -
10 4.00 1.00 4.00 x 4.00 x 0.62 9.864
6 Tulangan Tumpuan 0.40 4.00 0.15 0.52 x 11.00 x 0.22 1.269
6 Tulangan Lapangan 0.60 4.00 0.15 0.52 x 16.00 x 0.22 1.847

Volume 12.980 12.980

Panjang x Jumlah x Berat/m


16 - 1.00 4.00 x - x 1.58 -
0 - 1.00 4.00 x - x - -
0 Tulangan Tumpuan 0.40 4.00 0.15 0.52 x 11.00 x - -
0 Tulangan Lapangan 0.60 4.00 0.15 0.52 x 16.00 x - -

Volume - -

c. Pek. Begesting Balok ( 4X Pakai ) Panjang x Lebar / Pemakaian


0.15 - 0.15 2.00 4.00 x 0.30 / 4.00 0.300

Volume 0.300 0.300


6 Pek. Balok Uk. 15 x 20 ( Type B2 ) toc +3.00 0.15 0.20
a. Pek. Beton Mutu f'c = 19,3 MPa (K.225) Panjang x Lebar x Tinggi x Jumlah
H 4.00 2.00 x 0.15 x 0.20 x 2.00 0.120

Panjang Total (m) = 4.00 0.11 0.16 0.04 P. Beugel = 0.62 Volume 0.120 0.120

b. Pek. Pembesian Dengan Besi Polos Panjang x Jumlah x Berat/m


0 - 1.00 4.00 x - x - -
10 4.00 1.00 4.00 x 4.00 x 0.62 9.864
6 Tulangan Tumpuan 0.40 4.00 0.15 0.62 x 11.00 x 0.22 1.514
6 Tulangan Lapangan 0.60 4.00 0.15 0.62 x 16.00 x 0.22 2.202

Volume 13.579 13.579

Panjang x Jumlah x Berat/m


16 - 1.00 4.00 x - x 1.58 -
0 - 1.00 4.00 x - x - -
0 Tulangan Tumpuan 0.40 4.00 0.15 0.62 x 11.00 x - -
0 Tulangan Lapangan 0.60 4.00 0.15 0.62 x 16.00 x - -
Hit Volume 247

Volume - -

c. Pek. Begesting Balok ( 4X Pakai ) Panjang x Lebar / Pemakaian


0.15 - 0.20 2.00 4.00 x 0.40 / 4.00 0.400

Volume 0.400 0.400


Hit Volume 248

### Err:509 0.15 0.30


Err:509 Panjang x Lebar x Tinggi x Jumlah
H 14.33 4.78 x 0.15 x 0.30 x 3.00 0.645
H 15.70 3.93 x 0.15 x 0.30 x 4.00 0.707
H 16.00 4.00 x 0.15 x 0.30 x 4.00 0.720
H 20.00 4.00 x 0.15 x 0.30 x 5.00 0.900
H 1.50 0.50 x 0.15 x 0.30 x 3.00 0.068

V 27.00 13.50 x 0.15 x 0.30 x 2.00 1.215


V 19.00 9.50 x 0.15 x 0.30 x 2.00 0.855
V 1.75 1.75 x 0.15 x 0.30 x 1.00 0.079
V 3.15 3.15 x 0.15 x 0.30 x 1.00 0.142
Pengurangan Jumlah tiap grid
Plat Beton 118.43 x 0.15 x 0.12 x (1.00) (2.132)

Panjang Total (m) = 118.43 0.11 0.26 0.05 P. Beugel = 0.84 Volume 3.197 3.198

Err:509 Panjang x Jumlah x Berat/m


10 Tul Tengah 2.00 1.00 118.43 x 2.00 x 0.62 146.018
0 - 1.00 118.43 x - x - -
8 Tul Sengkan Tulangan Tumpuan 0.40 118.43 0.15 0.84 x 316.00 x 0.39 104.732
8 Tul Sengkan Tulangan Lapangan 0.60 118.43 0.20 0.84 x 355.00 x 0.39 117.658

Volume 368.408 368.408

Err:509 Panjang x Jumlah x Berat/m


13 6.00 1.00 118.43 x 6.00 x 1.04 740.311
16 - 1.00 118.43 x - x 1.58 -
0 Tul Sengkan Tulangan Tumpuan 0.40 118.43 0.15 0.84 x 316.00 x - -
0 Tul Sengkan Tulangan Lapangan 0.60 118.43 0.15 0.84 x 474.00 x - -

Volume 740.311 740.311

Err:509 Panjang x Lebar / Pemakaian


0.15 1.00 0.18 2.00 118.43 x 0.51 / 4.00 15.099

Volume 15.099 15.099

### Err:509 0.15 0.20


Err:509 Panjang x Lebar x Tinggi x Jumlah
H 11.15 11.15 x 0.15 x 0.20 x 1.00 0.335
H 13.00 6.50 x 0.15 x 0.20 x 2.00 0.390
H 8.30 4.15 x 0.15 x 0.20 x 2.00 0.249
H 1.50 1.50 x 0.15 x 0.20 x 1.00 0.045
H 18.00 4.50 x 0.15 x 0.20 x 4.00 0.540
H 3.00 3.00 x 0.15 x 0.20 x 1.00 0.090
Pengurangan
Plat Beton 54.95 x 0.15 x 0.10 x (1.00) (0.824)

Panjang Total (m) = 54.95 0.11 0.16 0.05 P. Beugel = 0.64 Volume 0.824 0.824

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 54.95 x - x - -
12 2.00 1.00 54.95 x 2.00 x 0.89 97.565
8 Tulangan Tumpuan 0.40 54.95 0.10 0.64 x 220.00 x 0.39 55.554
8 Tulangan Lapangan 0.60 54.95 0.15 0.64 x 220.00 x 0.39 55.554

Volume 208.673 208.673

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 54.95 x - x - -
16 8.00 1.00 54.95 x 8.00 x 1.58 693.794
0 Tulangan Tumpuan 0.40 54.95 0.15 0.64 x 147.00 x - -
0 Tulangan Lapangan 0.60 54.95 0.15 0.64 x 220.00 x - -

Volume 693.794 693.794

Err:509 Panjang x Lebar / Pemakaian


0.15 1.00 0.10 2.00 54.95 x 0.35 / 2.00 9.616

Volume 9.616 9.616

### Err:509
Err:509 Panjang x Lebar x Tinggi x Jumlah
5.00 x 1.25 x 0.10 x 1.00 0.625
2.50 x 2.00 x 0.10 x 2.00 1.000
5.00 x 2.00 x 0.10 x 1.00 1.000
7.90 x 1.60 x 0.10 x 1.00 1.264
6.00 x 0.98 x 0.10 x 1.00 0.585
3.00 x 2.75 x 0.10 x 1.00 0.825
2.00 x 1.50 x 0.10 x 2.00 0.600
1.00 x 3.25 x 0.10 x 1.00 0.325
3.00 x 3.00 x 0.10 x 1.00 0.900
2.75 x 3.00 x 0.10 x 1.00 0.825
3.00 x 3.25 x 0.10 x 1.00 0.975
4.00 x 3.00 x 0.10 x 1.00 1.200
3.25 x 2.60 x 0.10 x 1.00 0.845
3.50 x 3.00 x 0.10 x 1.00 1.050
2.75 x 1.30 x 0.10 x 1.00 0.358
8.10 x 0.55 x 0.10 x 1.00 0.446

- Volume 12.822 12.822

Err:509 Panjang x Jumlah x Berat/m x Jml Layer x Jumlah


10 Panjang 1.25 0.25 5.00 x 5.00 x 0.59 x 2.00 x 2.00 59.209
10 Panjang 2.00 0.25 2.50 x 8.00 x 0.59 x 2.00 x 1.00 23.683
10 Panjang 2.00 0.25 5.00 x 8.00 x 0.59 x 2.00 x 1.00 47.367
10 Panjang 1.60 0.25 7.90 x 7.00 x 0.59 x 2.00 x 2.00 130.970
10 Panjang 0.98 0.25 6.00 x 4.00 x 0.59 x 2.00 x 2.00 56.840
10 Panjang 2.75 0.25 3.00 x 11.00 x 0.59 x 2.00 x 2.00 78.155
10 Panjang 1.50 0.25 2.00 x 6.00 x 0.59 x 2.00 x 2.00 28.420
10 Panjang 3.25 0.25 1.00 x 13.00 x 0.59 x 2.00 x 2.00 30.789
10 Panjang 3.00 0.25 3.00 x 12.00 x 0.59 x 2.00 x 2.00 85.260
10 Panjang 3.00 0.25 2.75 x 12.00 x 0.59 x 2.00 x 2.00 78.155
10 Panjang 3.25 0.25 3.00 x 13.00 x 0.59 x 2.00 x 2.00 92.366
10 Panjang 3.00 0.25 4.00 x 12.00 x 0.59 x 2.00 x 2.00 113.681
10 Panjang 2.60 0.25 3.25 x 11.00 x 0.59 x 2.00 x 2.00 84.668
10 Panjang 3.00 0.25 3.50 x 12.00 x 0.59 x 2.00 x 2.00 99.471
10 Panjang 1.30 0.25 2.75 x 6.00 x 0.59 x 2.00 x 2.00 39.078
10 Panjang 0.55 0.25 8.10 x 3.00 x 0.59 x 2.00 x 2.00 57.551

10 Lebar 5.00 0.25 1.25 x 20.00 x 0.59 x 2.00 x 1.00 29.604


10 Lebar 2.50 0.25 2.00 x 10.00 x 0.59 x 2.00 x 1.00 23.683
10 Lebar 5.00 0.25 2.00 x 20.00 x 0.59 x 2.00 x 1.00 47.367
10 Lebar 7.90 0.25 1.60 x 32.00 x 0.59 x 2.00 x 2.00 121.259
10 Lebar 6.00 0.25 0.98 x 24.00 x 0.59 x 2.00 x 2.00 55.419
10 Lebar 3.00 0.25 2.75 x 12.00 x 0.59 x 2.00 x 2.00 78.155
10 Lebar 2.00 0.25 1.50 x 8.00 x 0.59 x 2.00 x 2.00 28.420
10 Lebar 1.00 0.25 3.25 x 4.00 x 0.59 x 2.00 x 2.00 30.789
10 Lebar 3.00 0.25 3.00 x 12.00 x 0.59 x 2.00 x 2.00 85.260
10 Lebar 2.75 0.25 3.00 x 11.00 x 0.59 x 2.00 x 2.00 78.155
10 Lebar 3.00 0.25 3.25 x 12.00 x 0.59 x 2.00 x 2.00 92.366
10 Lebar 4.00 0.25 3.00 x 16.00 x 0.59 x 2.00 x 2.00 113.681
10 Lebar 3.25 0.25 2.60 x 13.00 x 0.59 x 2.00 x 2.00 80.050
Hit Volume 249

10 Lebar 3.50 0.25 3.00 x 14.00 x 0.59 x 2.00 x 2.00 99.471


10 Lebar 2.75 0.25 1.30 x 11.00 x 0.59 x 2.00 x 2.00 33.867
10 Lebar 8.10 0.25 0.55 x 33.00 x 0.59 x 2.00 x 2.00 42.985

Panjang Jumlah Lapis Jumlah


8 20.00 x 5.00 x 0.39 x 2.00 x 1.00 78.912
8 10.00 x 8.00 x 0.39 x 2.00 x 1.00 63.130
8 20.00 x 8.00 x 0.39 x 2.00 x 1.00 126.259
8 31.60 x 7.00 x 0.39 x 2.00 x 1.00 174.553
8 24.00 x 4.00 x 0.39 x 2.00 x 1.00 75.756
8 12.00 x 11.00 x 0.39 x 2.00 x 1.00 104.164
8 8.00 x 6.00 x 0.39 x 2.00 x 1.00 37.878
8 4.00 x 13.00 x 0.39 x 2.00 x 1.00 41.034
8 12.00 x 12.00 x 0.39 x 2.00 x 1.00 113.633
8 11.00 x 12.00 x 0.39 x 2.00 x 1.00 104.164
8 12.00 x 13.00 x 0.39 x 2.00 x 1.00 123.103
8 16.00 x 12.00 x 0.39 x 2.00 x 1.00 151.511
8 13.00 x 11.00 x 0.39 x 2.00 x 1.00 112.844
8 14.00 x 12.00 x 0.39 x 2.00 x 1.00 132.572
8 11.00 x 6.00 x 0.39 x 2.00 x 1.00 52.082
8 32.40 x 3.00 x 0.39 x 2.00 x 1.00 76.702

8 5.00 x 20.00 x 0.39 x 2.00 x 1.00 78.912


8 8.00 x 10.00 x 0.39 x 2.00 x 1.00 63.130
8 8.00 x 20.00 x 0.39 x 2.00 x 1.00 126.259
8 6.40 x 32.00 x 0.39 x 2.00 x 1.00 161.612
8 3.90 x 24.00 x 0.39 x 2.00 x 1.00 73.862
8 11.00 x 12.00 x 0.39 x 2.00 x 1.00 104.164
8 6.00 x 8.00 x 0.39 x 2.00 x 1.00 37.878
8 13.00 x 4.00 x 0.39 x 2.00 x 1.00 41.034
8 12.00 x 12.00 x 0.39 x 2.00 x 1.00 113.633
8 12.00 x 11.00 x 0.39 x 2.00 x 1.00 104.164
8 13.00 x 12.00 x 0.39 x 2.00 x 1.00 123.103
8 12.00 x 16.00 x 0.39 x 2.00 x 1.00 151.511
8 10.40 x 13.00 x 0.39 x 2.00 x 1.00 106.689
8 12.00 x 14.00 x 0.39 x 2.00 x 1.00 132.572
8 5.20 x 11.00 x 0.39 x 2.00 x 1.00 45.138
8 2.20 x 33.00 x 0.39 x 2.00 x 1.00 57.290

Volume 5,235.442 5,235.443

Err:509 Panjang x Lebar / Pemakaian x Jumlah


5.00 x 1.25 / 4.00 x 1.00 1.563
2.50 x 2.00 / 4.00 x 2.00 1.250
5.00 x 2.00 / 4.00 x 1.00 2.500
7.90 x 1.60 / 4.00 x 1.00 3.160
6.00 x 0.98 / 4.00 x 1.00 1.463
3.00 x 2.75 / 4.00 x 1.00 2.063
2.00 x 1.50 / 4.00 x 2.00 0.750
1.00 x 3.25 / 4.00 x 1.00 0.813
3.00 x 3.00 / 4.00 x 1.00 2.250
2.75 x 3.00 / 4.00 x 1.00 2.063
3.00 x 3.25 / 4.00 x 1.00 2.438
4.00 x 3.00 / 4.00 x 1.00 3.000
3.25 x 2.60 / 4.00 x 1.00 2.113
3.50 x 3.00 / 4.00 x 1.00 2.625
2.75 x 1.30 / 4.00 x 1.00 0.894
8.10 x 0.55 / 4.00 x 1.00 1.114

Volume 30.055 30.055

### Err:509 0.15 0.20


Err:509 Panjang x Lebar x Tinggi x Jumlah
H 4.75 4.75 x 0.15 x 0.20 x 1.00 0.143
H 4.00 2.00 x 0.15 x 0.20 x 2.00 0.120
V 1.50 1.50 x 0.15 x 0.20 x 1.00 0.045

Pengurangan
Plat Beton 10.25 x 0.15 x 0.12 x (1.00) (0.185)

Panjang Total (m) = 10.25 0.11 0.16 0.04 P. Beugel = 0.62 Volume 0.123 0.123

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 10.25 x - x - -
10 4.00 1.00 10.25 x 4.00 x 0.62 25.277
6 Tulangan Tumpuan 0.40 10.25 0.10 0.62 x 41.00 x 0.22 5.642
6 Tulangan Lapangan 0.60 10.25 0.15 0.62 x 41.00 x 0.22 5.642

Volume 36.560 36.560

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 10.25 x - x - -
0 6.00 1.00 10.25 x 6.00 x - -
0 Tulangan Tumpuan 0.40 10.25 0.15 0.62 x 27.00 x - -
0 Tulangan Lapangan 0.60 10.25 0.15 0.62 x 41.00 x - -

Volume - -

Err:509 Panjang x Lebar / Pemakaian


0.15 1.00 0.08 2.00 10.25 x 0.31 / 2.00 1.589

Volume 1.589 1.589

### Err:509 0.15 0.30


Err:509 Panjang x Lebar x Tinggi x Jumlah
H 4.00 4.00 x 0.15 x 0.30 x 1.00 0.180
H 50.00 10.00 x 0.15 x 0.30 x 5.00 2.250
H 28.75 5.75 x 0.15 x 0.30 x 5.00 1.294
H 23.75 4.75 x 0.15 x 0.30 x 5.00 1.069
H 10.50 2.10 x 0.15 x 0.30 x 5.00 0.473
H 10.00 2.00 x 0.15 x 0.30 x 5.00 0.450
H 10.00 2.00 x 0.15 x 0.30 x 5.00 0.450

V 12.00 12.00 x 0.15 x 0.30 x 1.00 0.540


V 5.75 5.75 x 0.15 x 0.30 x 1.00 0.259
V 3.00 3.00 x 0.15 x 0.30 x 1.00 0.135
V 2.33 2.33 x 0.15 x 0.30 x 1.00 0.105
V 2.50 2.50 x 0.15 x 0.30 x 1.00 0.113
V 5.50 5.50 x 0.15 x 0.30 x 1.00 0.248
V 11.00 11.00 x 0.15 x 0.30 x 1.00 0.495
V 1.50 1.50 x 0.15 x 0.30 x 1.00 0.068
V 1.50 1.50 x 0.15 x 0.30 x 1.00 0.068
V 12.00 12.00 x 0.15 x 0.30 x 1.00 0.540

Pengurangan
Plat Beton 194.08 x 0.15 x 0.12 x (1.00) (3.493)

Panjang Total (m) = 194.08 0.11 0.26 - P. Beugel = 0.74 Volume 5.240 5.240

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 194.08 x - x - -
10 2.00 1.00 194.08 x 2.00 x 0.62 239.294
Hit Volume 250

0 Tulangan Tumpuan 0.40 194.08 0.10 0.74 x 776.00 x - -


0 Tulangan Lapangan 0.60 194.08 0.15 0.74 x 776.00 x - -

Volume 239.294 239.295

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 194.08 x - x - -
13 4.00 1.00 194.08 x 4.00 x 1.04 808.815
0 Tulangan Tumpuan 0.40 194.08 0.15 0.74 x 518.00 x - -
0 Tulangan Lapangan 0.60 194.08 0.15 0.74 x 776.00 x - -

Volume 808.815 808.815

Err:509 Panjang x Lebar / Pemakaian


0.15 1.00 0.18 2.00 194.08 x 0.51 / 2.00 49.489

Volume 49.489 49.489

### Err:509
Err:509 Panjang x Lebar x Tinggi x Jumlah
4.00 x 1.50 x 0.12 x 1.00 0.720
1.00 x 1.25 x 0.12 x 1.00 0.150
4.00 x 1.00 x 0.12 x 1.00 0.480
4.75 x 1.00 x 0.12 x 1.00 0.570
5.25 x 3.00 x 0.12 x 1.00 1.890
4.75 x 1.00 x 0.12 x 1.00 0.570
1.50 x 1.50 x 0.12 x 1.00 0.270
3.25 x 1.50 x 0.12 x 1.00 0.585
11.73 x 1.00 x 0.12 x 1.00 1.408
2.00 x 1.50 x 0.12 x 2.00 0.720
10.81 x 1.00 x 0.12 x 2.00 2.594
3.75 x 3.50 x 0.12 x 2.00 3.150
3.50 x 2.00 x 0.12 x 2.00 1.680
2.25 x 1.50 x 0.12 x 1.00 0.405

- Volume 15.192 15.192

Err:509 Panjang x Jumlah x Berat/m x Jml Layer x Jumlah


10 Panjang 1.50 0.25 4.00 x 6.00 x 0.59 x 2.00 x 2.00 56.840
10 Panjang 1.25 0.25 1.00 x 5.00 x 0.59 x 2.00 x 1.00 5.921
10 Panjang 1.00 0.25 4.00 x 4.00 x 0.59 x 2.00 x 1.00 18.947
10 Panjang 1.00 0.25 4.75 x 4.00 x 0.59 x 2.00 x 2.00 44.999
10 Panjang 3.00 0.25 5.25 x 12.00 x 0.59 x 2.00 x 2.00 149.206
10 Panjang 1.00 0.25 4.75 x 4.00 x 0.59 x 2.00 x 2.00 44.999
10 Panjang 1.50 0.25 1.50 x 6.00 x 0.59 x 2.00 x 2.00 21.315
10 Panjang 1.50 0.25 3.25 x 6.00 x 0.59 x 2.00 x 2.00 46.183
10 Panjang 1.00 0.25 11.73 x 4.00 x 0.59 x 2.00 x 2.00 111.123
10 Panjang 1.50 0.25 2.00 x 6.00 x 0.59 x 2.00 x 2.00 28.420
10 Panjang 1.00 0.25 10.81 x 4.00 x 0.59 x 2.00 x 2.00 102.407
10 Panjang 3.50 0.25 3.75 x 14.00 x 0.59 x 2.00 x 2.00 124.338
10 Panjang 2.00 0.25 3.50 x 8.00 x 0.59 x 2.00 x 2.00 66.314
10 Panjang 1.50 0.25 2.25 x 6.00 x 0.59 x 2.00 x 2.00 31.973

10 Lebar 4.00 0.25 1.50 x 16.00 x 0.59 x 2.00 x 1.00 28.420


10 Lebar 1.00 0.25 1.25 x 4.00 x 0.59 x 2.00 x 1.00 5.921
10 Lebar 4.00 0.25 1.00 x 16.00 x 0.59 x 2.00 x 1.00 18.947
10 Lebar 4.75 0.25 1.00 x 19.00 x 0.59 x 2.00 x 2.00 44.999
10 Lebar 5.25 0.25 3.00 x 21.00 x 0.59 x 2.00 x 2.00 149.206
10 Lebar 4.75 0.25 1.00 x 19.00 x 0.59 x 2.00 x 2.00 44.999
10 Lebar 1.50 0.25 1.50 x 6.00 x 0.59 x 2.00 x 2.00 21.315
10 Lebar 3.25 0.25 1.50 x 13.00 x 0.59 x 2.00 x 2.00 46.183
10 Lebar 11.73 0.25 1.00 x 47.00 x 0.59 x 2.00 x 2.00 111.312
10 Lebar 2.00 0.25 1.50 x 8.00 x 0.59 x 2.00 x 2.00 28.420
10 Lebar 10.81 0.25 1.00 x 44.00 x 0.59 x 2.00 x 2.00 104.207
10 Lebar 3.75 0.25 3.50 x 15.00 x 0.59 x 2.00 x 2.00 124.338
10 Lebar 3.50 0.25 2.00 x 14.00 x 0.59 x 2.00 x 2.00 66.314
10 Lebar 2.25 0.25 1.50 x 9.00 x 0.59 x 2.00 x 2.00 31.973
Panjang Jumlah Lapis Jumlah
8 16.00 x 6.00 x 0.39 x 2.00 x 1.00 75.756
8 4.00 x 5.00 x 0.39 x 2.00 x 1.00 15.782
8 16.00 x 4.00 x 0.39 x 2.00 x 1.00 50.504
8 19.00 x 4.00 x 0.39 x 2.00 x 1.00 59.973
8 21.00 x 12.00 x 0.39 x 2.00 x 1.00 198.858
8 19.00 x 4.00 x 0.39 x 2.00 x 1.00 59.973
8 6.00 x 6.00 x 0.39 x 2.00 x 1.00 28.408
8 13.00 x 6.00 x 0.39 x 2.00 x 1.00 61.551
8 46.92 x 4.00 x 0.39 x 2.00 x 1.00 148.102
8 8.00 x 6.00 x 0.39 x 2.00 x 1.00 37.878
8 43.24 x 4.00 x 0.39 x 2.00 x 1.00 136.486
8 15.00 x 14.00 x 0.39 x 2.00 x 1.00 165.715
8 14.00 x 8.00 x 0.39 x 2.00 x 1.00 88.381
8 9.00 x 6.00 x 0.39 x 2.00 x 1.00 42.612
8 - x - x 0.39 x 2.00 x 1.00 -
8 - x - x 0.39 x 2.00 x 1.00 -
8 6.00 x 16.00 x 0.39 x 2.00 x 1.00 75.756
8 5.00 x 4.00 x 0.39 x 2.00 x 1.00 15.782
8 4.00 x 16.00 x 0.39 x 2.00 x 1.00 50.504
8 4.00 x 19.00 x 0.39 x 2.00 x 1.00 59.973
8 12.00 x 21.00 x 0.39 x 2.00 x 1.00 198.858
8 4.00 x 19.00 x 0.39 x 2.00 x 1.00 59.973
8 6.00 x 6.00 x 0.39 x 2.00 x 1.00 28.408
8 6.00 x 13.00 x 0.39 x 2.00 x 1.00 61.551
8 4.00 x 47.00 x 0.39 x 2.00 x 1.00 148.355
8 6.00 x 8.00 x 0.39 x 2.00 x 1.00 37.878
8 4.00 x 44.00 x 0.39 x 2.00 x 1.00 138.885
8 14.00 x 15.00 x 0.39 x 2.00 x 1.00 165.715
8 8.00 x 14.00 x 0.39 x 2.00 x 1.00 88.381
8 6.00 x 9.00 x 0.39 x 2.00 x 1.00 42.612

Volume 4,022.150 4,022.150

Err:509 Panjang x Lebar / Pemakaian x Jumlah


4.00 x 1.50 / 4.00 x 1.00 1.500
1.00 x 1.25 / 4.00 x 1.00 0.313
4.00 x 1.00 / 4.00 x 1.00 1.000
4.75 x 1.00 / 4.00 x 1.00 1.188
5.25 x 3.00 / 4.00 x 1.00 3.938
4.75 x 1.00 / 4.00 x 1.00 1.188
1.50 x 1.50 / 4.00 x 1.00 0.563
3.25 x 1.50 / 4.00 x 1.00 1.219
11.73 x 1.00 / 4.00 x 1.00 2.933
2.00 x 1.50 / 4.00 x 2.00 0.750
10.81 x 1.00 / 4.00 x 2.00 2.703
3.75 x 3.50 / 4.00 x 2.00 3.281
3.50 x 2.00 / 4.00 x 2.00 1.750
2.25 x 1.50 / 4.00 x 1.00 0.844

Volume 23.166 23.166

### Err:509
Err:509 Panjang x Lebar x Tinggi x Jumlah
Hit Volume 251

12.00 x 1.00 x 0.10 x 2.00 2.400


1.93 x 5.75 x 0.10 x 1.00 1.107

- Volume 3.507 3.507

Err:509 Panjang x Jumlah x Berat/m x Jml Layer x Jumlah


10 Panjang 1.00 0.25 12.00 x 4.00 x 0.59 x 2.00 x 2.00 113.681
10 Panjang 5.75 0.25 1.93 x 23.00 x 0.59 x 2.00 x 1.00 52.429

10 Lebar 12.00 0.25 1.00 x 48.00 x 0.59 x 2.00 x 1.00 56.840


10 Lebar 1.93 0.25 5.75 x 8.00 x 0.59 x 2.00 x 1.00 54.472

Volume 277.422 277.422

Err:509 Panjang x Lebar / Pemakaian x Jumlah


12.00 x 1.00 / 4.00 x 2.00 3.000
1.93 x 5.75 / 4.00 x 1.00 2.767

Volume 5.767 5.767


### Err:509 0.15 0.15
Err:509 Tinggi x Dimensi Kolom x Jumlah
136.00 4.00 x 0.15 x 0.15 x 34.00 3.060
4.00 1.00 x 0.15 x 0.15 x 4.00 0.090
8.00 1.00 x 0.15 x 0.15 x 8.00 0.180

Panjang Total (m) = 148.00 0.11 0.11 0.04 P. Beugel = 0.52 Volume 3.330 3.330

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 148.00 x - x - -
10 4.00 1.00 148.00 x 4.00 x 0.62 364.968
6 Tulangan Tumpuan 0.40 148.00 0.15 0.52 x 395.00 x 0.22 45.586
6 Tulangan Lapangan 0.60 148.00 0.15 0.52 x 592.00 x 0.22 68.322

Volume 478.876 478.877

Err:509 Panjang x Lebar / Pemakaian


0.15 - 0.15 2.00 148.00 x 0.30 / 4.00 11.100

Volume 11.100 11.100


### Err:509 0.15 0.15
Err:509 Tinggi x Dimensi Kolom x Jumlah
4.00 1.00 x 0.15 x 0.15 x 4.00 0.090

Panjang Total (m) = 4.00 0.11 0.11 0.04 P. Beugel = 0.52 Volume 0.090 0.090

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 4.00 x - x - -
10 4.00 1.00 4.00 x 4.00 x 0.62 9.864
6 Tulangan Tumpuan 0.40 4.00 0.15 0.52 x 11.00 x 0.22 1.269
6 Tulangan Lapangan 0.60 4.00 0.15 0.52 x 16.00 x 0.22 1.847

Volume 12.980 12.980

Err:509 Panjang x Lebar / Pemakaian


0.15 - 0.15 2.00 4.00 x 0.30 / 4.00 0.300

Volume 0.300 0.300

### Err:509 0.15 0.20


Err:509 Panjang x Lebar x Tinggi x Jumlah
40.00 40.00 x 0.15 x 0.20 x 1.00 1.200

Pengurangan
Plat Beton 40.00 x 0.15 x 0.10 x (1.00) (0.600)

Panjang Total (m) = 40.00 0.11 0.16 0.04 P. Beugel = 0.62 Volume 0.600 0.600

Err:509 Panjang x Jumlah x Berat/m


0 - 1.00 40.00 x - x - -
10 4.00 1.00 40.00 x 4.00 x 0.62 98.640
6 Tulangan Tumpuan 0.40 40.00 0.10 0.62 x 160.00 x 0.22 22.016
6 Tulangan Lapangan 0.60 40.00 0.15 0.62 x 160.00 x 0.22 22.016

Volume 142.673 142.673

Err:509 Panjang x Lebar / Pemakaian


0.15 1.00 0.10 2.00 40.00 x 0.35 / 4.00 3.500

Volume 3.500 3.500


Hit Volume 252

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan : Pembanguan Rumah
Pekerjaan : Pembanguan Rumah BU Diana
Lokasi : #NAME?
Sumber Dana : #NAME?
Tahun : #NAME?
Sub Pekerjaan : PEKERJAAN GAPURA
2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4

IV PEKERJAAN GAPURA
1 Pemasangan Gapura Besi Stainless Panjang x Berat/m x Jml/Sekmen x Jumlah
Berat/Btg 24.40 Kg/Btg KK1 Atas 9.60 x 13.60 x 1.00 x 1.00 130.560
Pjg/Btg 6.00 m Bawah 11.53 x 6.60 x 1.00 x 1.00 76.065
Berat/m 4.07 Kg/m

206.63 / 4.07 = 50.81 m1 Volume 206.625 206.630

2 Pasang Huruf Panjang x x Jumlah


9.75 x 0.50 2.73 x 2.00 26.618
besar 13.60 4.00 8.80 5.50 2.00 96.800
kecil 7.00 x 0.50 2.45 x 2.00 17.150
11.53 5.50 8.51 3.90 2.00 66.398

Volume 206.965 206.970

0 0 Panjang x Jumlah
10.05 + - + 0.39 x 1.00 3.920
12.25 + - + 0.39 x 1.00 4.778

Volume 8.697 8.700


Hit Volume 253

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan : Pembangunan Gedung Rawat Inap
Pekerjaan : Reviu Perencanaan Pembangunan Gedung Rawat Inap
Lokasi : RSUD Dr. SAYIDIMAN Kabupaten Magetan
Sumber Dana : -
Tahun : 2018
Sub Pekerjaan : PEKERJAAN FASAD
2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4

VI PEKERJAAN FASAD
1 Pas.batu Lempeng Panjang x Tinggi x Jumlah
Depan 9.29 x 1.00 x 1.00 9.290

Volume 9.290 9.290

2 Pas. Batu Andesit Susun Sirih Panjang x Lebar x Jumlah


15.11 x 1.00 x 1.00 15.110
2.95 x 1.00 x 4.00 11.800
1.20 x 2.60 x 6.00 18.720
97.75 x 1.00 x 1.00 97.750
2.75 x 1.00 x 1.00 2.750
5.20 x 1.00 x 1.00 5.200

Volume 151.330 151.330

3 Pas. Papan Coonwood Panjang x Lebar x Jumlah


10.35 x 1.00 x 1.00 10.350
12.21 x 1.00 x 1.00 12.210

Volume 22.560 22.560

4 Pas.Batu Palimanan Panjang x Lebar x Jumlah


185.00 x 1.00 x 1.00 185.000
4.75 x 1.00 x 1.00 4.750
74.00 x 1.00 x 1.00 74.000
5.74

Volume 263.750 263.750


RENCANA ANGGARAN BIAYA ( RAB )

Tahun Anggaran : 2020


Kegiatan : Bidang Pembangunan Desa
Volume :
Pekerjaan : Pembangunan Gapura
Lokasi Pekerjaan :

Harga Satuan
No. Uraian Volume Satuan Jumlah Harga (Rp)
(Rp)
1 2 3 4 5 6

I KEBUTUHAN BAHAN
1 Tanah Urug 1.00 m3 150,000.00 150,000.00
2 Pasir Pasang 2.00 m3 275,000.00 550,918.50
3 Semen Portland 11.00 zak 65,000.00 714,993.24
4 Batu Bata 588.00 zak 650.00 382,200.00
5 Batu Pecah 2/3 1.00 m3 275,000.00 274,986.25
6 Plywood Tbl 9 mm 2.00 lbr 115,000.00 230,000.00
7 Paku Biasa 3.00 kg 20,000.00 60,000.00
8 Kawat Beton 4.00 kg 20,000.00 80,000.00
9 Besi 6 10.00 lonjor 27,500.00 275,000.00
10 Besi 10 12.00 lonjor 37,500.00 450,000.00
11 Pemasangan Gapura Besi Stainless 1.00 Ls 3,750,000.00 3,750,000.00
12 Pasang Huruf 1.00 Ls 750,000.00 750,000.00

Jumlah I 7,668,097.99
II KEBUTUHAN ALAT
1 Benang 1.0 roll 10,000.00 10,000.00
2 Palu 3 Kg 3.0 bh 55,000.00 165,000.00
3 Cikrak Bambu 8.0 bh 17,500.00 140,000.00
4 Cangkul 1.0 bh 125,000.00 125,000.00

Jumlah II 440,000.00
III KEBUTUHAN TENAGA
1 Pekerja 18.00 OH 80,000.00 1,200,000.00
2 Tukang 14.00 OH 90,000.00 10,440,000.00

Jumlah III 11,640,000.00


TOTAL I+II+ (Rp) 19,748,097.99

- - 2020

Disetujui/mengesahkan Telah Diverifikasi TPK Dibuat Oleh*


Kepala Desa Sekdes

,,,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,, ,,,,,,,,,,,,,,,,


Hit Volume 255

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
#REF! : #REF!
#REF! : #REF!
3.000
NO PEKERJAAN HITUNGAN VOLUME 3.000
1 2 3 4

#REF! #REF! 1.00 Unit


#REF! Panjang x Lebar x Dalam
1.80 x 2.75 x 1.85 9.158

Volume 9.158 9.158


9.16 x 1.00 Unit 9.158 9.158

#REF! Panjang x Lebar x Dalam x Jumlah


1.80 x 2.75 x 1.85 x 1.00 9.158
Pengurangan
1.40 x 2.45 x 1.65 x (1.00) (5.660)

Volume 3.498 3.498


3.50 x 1.00 Unit 3.498 3.498

#REF! Panjang x Lebar x Tebal x Jumlah


1.80 x 2.75 x 0.20 x 1.00 0.990

Volume 0.990 0.990


0.99 x 1.00 Unit 0.990 0.990

#REF! Panjang x Tinggi


0.80 x 0.85 x 1.00 0.680
0.20 x 0.50 x 2.00 0.200

Volume 0.880 0.880


0.88 x 1.00 Unit 0.880 0.880

#REF! Panjang x Tinggi x Jumlah


1.40 x 2.45 x 1.00 3.430
1.85 x 1.45 x 2.00 5.365
1.40 x 1.45 x 2.00 4.060

Volume 12.855 12.855


12.86 x 1.00 Unit 12.855 12.855

#REF! Panjang x Tinggi x Jml Sisi x Jumlah


1.85 x 1.45 x 1.00 x 2.00 5.365
0.80 x 1.45 x 1.00 x 2.00 2.320
0.80 x 0.85 x 2.00 x 1.00 0.680
0.20 x 0.50 x 2.00 x 2.00 0.200

Volume 8.565 8.565


8.57 x 1.00 Unit 8.565 8.565

#REF! Vol. Plesteran


8.57 8.565

Volume 8.565 8.565


8.57 x 1.00 Unit 8.565 8.565

#REF!
#REF! Panjang x Lebar x Tebal x Jumlah
2.15 x 1.10 x 0.10 x 1.00 0.237

Volume 0.237 0.237


0.24 x 1.00 Unit 0.237 0.237

#REF! Panjang x Jumlah x Berat / m


10 2.15 0.15 1.10 x 14.00 x 0.62 9.494
10 1.10 0.15 2.15 x 7.00 x 0.62 9.278

Volume 18.772 18.772


18.77 x 1.00 Unit 18.772 18.772

#REF! Panjang x Tinggi


2.15 2.00 1.10 2.00 6.50 x 0.10 0.650

Volume 0.650 0.650


0.65 x 1.00 Unit 0.650 0.650

#REF! Panjang
2.00 2.000

Volume 2.000 2.000


2.00 x 1.00 Unit 2.000 2.000

#REF! #REF! 1.00 Unit


#REF! 1.80 Koefisien x Jari2 x Jari2 x Dalam
3.14 x 0.90 x 0.90 x 2.10 5.341

Volume 5.341 5.341


5.34 x 1.00 Unit 5.341 5.341

#REF! Koefisien x Jari2 x Jari2 x Tbl


3.14 x 0.90 x 0.90 x 0.20 0.509

Volume 0.509 0.509


0.51 x 1.00 Unit 0.509 0.509

#REF! Koefisien x Diameter x Tinggi


3.14 x 1.10 x 0.60 2.072
Hit Volume 256

3.14 x 1.10 x 0.30 1.036

Volume 3.109 3.109


3.11 x 1.00 Unit 3.109 3.109

#REF! Koefisien x Diameter x Tinggi


3.14 x 1.10 x 1.00 3.454

Volume 3.454 3.454


3.45 x 1.00 Unit 3.454 3.454

#REF! Koefisien x Jari2 x Jari2 x Tbl


3.14 x 0.90 x 0.90 x 1.30 3.306
3.14 x 0.40 x 0.40 x 0.30 0.151
Pengurangan
3.14 x 0.70 x 0.70 x 1.30 (2.000)

Volume 1.457 1.457


1.46 x 1.00 Unit 1.457 1.457

#REF!
#REF! Koefisien x Jari2 x Jari2 x Tbl
3.14 x 0.55 x 0.55 x 0.08 0.076

Volume 0.076 0.076


0.08 x 1.00 Unit 0.076 0.076

#REF! Panjang x Jumlah x BJ / m


8 3.45 0.15 0.55 x 23.03 x 0.39 4.997
8 1.10 3.14 3.45 x 1.00 x 0.39 1.363
8 0.80 3.14 2.51 x 1.00 x 0.39 0.991
8 0.50 3.14 1.57 x 1.00 x 0.39 0.619
8 0.20 3.14 0.63 x 1.00 x 0.39 0.248

Volume 8.218 8.218


8.22 x 1.00 Unit 8.218 8.218

#REF! Koefisien x Diameter x Tinggi


3.14 x 1.10 x 0.08 0.276

Volume 0.276 0.276


0.28 x 1.00 Unit 0.276 0.276
Hit Volume 257

DATA PENDUKUNG
BACK UP VOLUME PEKERJAAN
Kegiatan : Pembanguan Rumah
Pekerjaan : Pembanguan Rumah BU Diana
Lokasi : #NAME?
Sumber Dana : #NAME?
Tahun : #NAME?
Sub Pekerjaan : #REF!

2.000
NO PEKERJAAN HITUNGAN VOLUME
1 2 3 4
Hit Volume 258

#REF! #REF!
#REF!

#REF! #REF! x Jumlah


1.20 x 10.00 12.000
47.00 x 1.00 47.000
9.00 x 1.00 9.000

Volume 68.000 68.000

#REF! #REF! x Jumlah


x 42.00 42.000

Volume 42.000 42.000

#REF! #REF! x Jumlah


x 230.00 230.000

Volume 230.000 230.000

#REF! #REF! x Jumlah


x 36.00 36.000

Volume 36.000 36.000

#REF! #REF! x Jumlah


x 48.00 48.000

Volume 48.000 48.000

NO PEKERJAAN HITUNGAN VOLUME


1 2 3 4

#REF! #REF!
#REF!

#REF! #REF! x Jumlah


x - -

Volume - -

#REF! #REF! x Jumlah


4.00 x 1.00 4.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
32.00 x 1.00 32.000
32.00 x 1.00 32.000

Volume 100.000 100.000

#REF! #REF! x Jumlah


4.00 x 1.00 4.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
8.00 x 1.00 8.000
32.00 x 1.00 32.000
32.00 x 1.00 32.000

Volume 100.000 100.000

#REF! #REF! x Jumlah


16.00 x 1.00 16.000
16.00 x 1.00 16.000
10.00 x 1.00 10.000
16.00 x 1.00 16.000
30.00 x 1.00 30.000

Volume 88.000 88.000

#REF! #REF! x Jumlah


4.00 x 9.00 x 1.00 36.000

Volume 36.000 36.000

#REF! #REF! x Jumlah


x 36.00 36.000

Volume 36.000 36.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000


#REF!
#REF!
Hit Volume 259

#REF! #REF! x Jumlah


x 52.00 52.000

Volume 52.000 52.000

#REF! #REF! x Jumlah


x 67.00 67.000

Volume 67.000 67.000

#REF! #REF! x Jumlah


x 104.00 104.000

Volume 104.000 104.000

#REF! #REF! x Jumlah


x 42.00 42.000

Volume 42.000 42.000

#REF! #REF! x Jumlah


x 46.00 46.000

Volume 46.000 46.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000


#REF! x Jumlah
#REF! x 22.00 22.000

Volume 22.000 22.000

#REF! #REF! x Jumlah


x 52.00 52.000

Volume 52.000 52.000

#REF! #REF! x Jumlah


x 68.00 68.000

Volume 68.000 68.000

#REF! #REF! x Jumlah


x 124.00 124.000

Volume 124.000 124.000

#REF! #REF! x Jumlah


x 42.00 42.000

Volume 42.000 42.000

#REF! #REF! x Jumlah


x 46.00 46.000

Volume 46.000 46.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF!
#REF! #REF! x Jumlah
x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 24.00 24.000

Volume 24.000 24.000

#REF!
#REF! #REF! x Jumlah
x 20.00 20.000

Volume 20.000 20.000

#REF! #REF! x Jumlah


x 4.00 4.000

Volume 4.000 4.000


Hit Volume 260

#REF! #REF!
#REF!

#REF! #REF! x Jumlah


x 45.00 45.000

Volume 45.000 45.000

#REF! #REF! x Jumlah


x 45.00 45.000

Volume 45.000 45.000

#REF! #REF! x Jumlah


x 45.00 45.000

Volume 45.000 45.000

#REF! #REF! x Jumlah


x 35.00 35.000

Volume 35.000 35.000

#REF! #REF! x Jumlah


x 50.00 50.000

Volume 50.000 50.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000

#REF! #REF! x Jumlah


x 6.00 6.000

Volume 6.000 6.000

#REF! #REF! x Jumlah


x 6.00 6.000

Volume 6.000 6.000

#REF! #REF! x Jumlah


x 42.00 42.000

Volume 42.000 42.000

#REF! #REF! x Jumlah


x 3.00 3.000

Volume 3.000 3.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000
Hit Volume 261

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 2.00 2.000

Volume 2.000 2.000

#REF! #REF! x Jumlah


x 2.00 2.000

Volume 2.000 2.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF! x Jumlah


x 1.00 1.000

Volume 1.000 1.000

#REF! #REF!
#REF! x Jumlah
#REF! #REF!

x 48.00 48.000

Volume 48.000 48.000

#REF! #REF! x Jumlah


8.00 16.00 x 1.00 128.000

Volume 128.000 128.000


#REF! #REF!
#REF! #REF!
#REF! #REF! x Jumlah
x 19.00 19.000

Volume 19.000 19.000

#REF! #REF! x Jumlah


x 25.00 25.000

Volume 25.000 25.000

#REF! #REF! x Jumlah


x 5.00 5.000

Volume 5.000 5.000


Hit Volume 262

DOKUMEN NEGARA - SANGAT RAHASIA


TIME SCEDULLE
Kegiatan : Pembangunan Jalan
Pekerjaan : DED Perbangunan Drag Race Kalimati Tahap 2
Lokasi : Kec.Ngawi
Tahun : 2018

WAKTU PELAKSANAAN 120 Hari


NO NAMA PEKERJAAN BOBOT MINGGU KE -
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

I PERSIAPAN 0.018 0.009

II PEKERJAAN LINTASAN DRAG RACE 72.814 8.090 8.09 8.09 8.09 8.09

III PEKERJAAN DINDING PENAHAN 9.483 1.185 1.185 1.185 1.185 1.185 1.185 1.185 1.185

IV PEKERJAAN PERKERASAN JALAN 1.648 0.412 0.412 0.412 0.412

V PEKERJAAN PERKERASAN TEMPAT PARKIR 16.037 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069 1.069

JUMLAH 100.000 0.009 2.255 2.255 2.255 2.255 2.666 2.666 2.666 10.757 9.160 9.160 9.160 9.160 - - - - - - - - - -
KOMULATIF - 0.009 2.263 4.518 6.772 9.027 11.693 14.360 17.026 27.783 36.943 46.103 55.262 64.422 64.422 64.422 64.422 64.422 64.422 64.422 64.422 64.422 64.422 64.422

Disetujui Oleh :
Pejabat Pembuat Komitmen (PPK)
###
###
###
###
MOHAMMAD SADLI, S.T., M.T.
NIP. 19721030 200003 1 006
KET.
24 25 26 27 28 29 30 31 32

0.009

8.09 8.09 8.09 8.09

Waktu Pelaksanaan 120 Hari Kalender


1.069 1.069 1.069

- - - - 9.160 9.160 9.160 8.090 0.009


64.422 64.422 64.422 64.422 73.581 82.741 91.901 99.991 100.000

Ngawi, 2018
Dibuat Oleh :
Konsultan Perencana
CV.GRAHA CITRA SELARAS
-
-
-
FARID YUDHA UMBARA, S.T., M.T.
Direktur