ENGINEERING ESTIMATE
KEGIATAN : PROGRAM PENDIDIKAN TINGGI
TAHUN : 2021
1 2 3
7 Err:509 Err:509
8 Err:509 Err:509
9 Err:509 Err:509
10 Err:509 Err:509
JUMLAH Err:509
PPN 10% Err:509
JUMLAH TOTAL Err:509
DIBULATKAN Err:509
Lima Puluh Enam Milyar Delapan Ratus Lima Juta Lima Ratus Ribu Rupiah
ISNAL, ST
Direktur
REKAPITULASI
ENGINEERING ESTIMATE
TAHUN : 2021
1 2 3
I PEKERJAAN STRUKTUR DAN ARSITEKTUR
1 PEKERJAAN PERSIAPAN 1,260,000.00
2 PEKERJAAN PONDASI 4,288,821.21
3 PEKERJAAN STRUKTUR SHELTER 21,690,890.48
4 Err:509 Err:509
5 Err:509 Err:509
6 Err:509 Err:509
7 Err:509 Err:509
8 Err:509 Err:509
9 Err:509 Err:509
10 Err:509 Err:509
11 PEKERJAAN ATAP 6,558,408.00
12 0 Err:509
SUBTOTAL I Err:509
II PEKERJAAN MEKANIKAL, ELEKTRIKAL, DAN PLAMBING (MEP)
1 #REF! #REF!
2 #REF! #REF!
SUBTOTAL II #REF!
TOTAL (I+II) Err:509
PROFIT KONTRAKTOR 10% Err:509
TOTAL JUMLAH + PROFIT KONTRAKTOR Err:509
PPN 10% Err:509
DIBULATKAN Err:509
Sepuluh Milyar Empat Ratus Tujuh Juta Seratus Sepuluh Ribu Rupiah
TAHUN : 2021
1 2 3
TAHUN : 2021
NO URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (Rp) JUMLAH HARGA (Rp)
1 2 3 4 5 6
I PEKERJAAN PERSIAPAN
1 Pek. Pembersihan dan perataan lapangan 72.00 m2 17,500.00 1,260,000.00
SUB TOTAL I 1,260,000.00
II PEKERJAAN PONDASI
1 Pek. Pondasi
a. Pek. Galian tanah 2.52 m3 78,750.00 198,450.00
b. Pek. Urugan pasir 0.08 m3 96,500.00 7,237.50
d. Pek. Pondasi beton bertulang K 250
- Pek. Beton 1.00 m3 933,740.71 933,740.71
- Pek. Pembesian 181.16 kg 11,695.00 2,118,622.99
- Pek. Bekisting 5.85 m2 176,200.00 1,030,770.00
SUB TOTAL II 4,288,821.21
III PEKERJAAN STRUKTUR SHELTER
1 Pek. Tiang Kolom Steel Pipe Diameter 6" 7.50 m' 240,820.00 1,806,150.00
2 Pek. Rafter Steel Pipe Diameter 6" 16.80 m' 240,820.00 4,045,776.00
3 Pek. Balok Steel Pipe Diameter 6" 10.00 m' 240,820.00 2,408,200.00
4 Pek. Ring Balok Steel Pipe Diameter 2" 72.00 m' 100,820.00 7,259,040.00
5 Pek. Tempat Duduk Rangka Besi Hollow 40x40 5.66 m2 218,200.00 1,235,830.25
6 Pek. Pelat Besi Tebal 16 mm 281.66 kg 11,695.00 3,294,042.94
7 Cat Pengecatan Besi 33.58 m2 48,898.75 1,641,851.29
SUB TOTAL III 21,690,890.48
IV PEKERJAAN ATAP
1 Pek. Pemasangan atap Seng Spandek 0,3 mm 72.00 m2 91,089.00 6,558,408.00
SUB TOTAL IV 6,558,408.00
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Tukang kayu L.02 OH 0.10 120,000.00 12,000.00
Kepala tukang L.03 OH 0.01 150,000.00 1,500.00
Mandor L.04 OH 0.005 150,000.00 750.00
JUMLAH TENAGA KERJA 24,250.00
B BAHAN
Kayu balok 5/7 m3 0.012 2,000,000.00 24,000.00
Paku 2”-3” Kg 0.02 15,000.00 300.00
Kayu papan 3/20 m3 0.007 2,000,000.00 14,000.00
JUMLAH HARGA BAHAN 38,300.00
C PERALATAN
JUMLAH HARGA ALAT -
A TENAGA
Pekerja L.01 OH 0.10 100,000.00 10,000.00
Mandor L.04 OH 0.05 150,000.00 7,500.00
JUMLAH TENAGA KERJA 17,500.00
B BAHAN
JUMLAH HARGA BAHAN -
C PERALATAN
A. 2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari seng gelombang tinggi 2 meter
A. A.4.1.1.5. Membuat 1 m3 beton mutu f’c = 14,5 MPa, slump (120 ± 20) mm
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga (Rp)
No
(Rp)
A TENAGA
Pekerja L.01 OH 1.650 100,000.00 165,000.00
Tukang batu L.02 OH 0.275 120,000.00 33,000.00
Kepala tukang L.03 OH 0.028 150,000.00 4,200.00
Mandor L.04 OH 0.083 150,000.00 12,450.00
JUMLAH TENAGA KERJA 214,650.00
B BAHAN
Semen Portland kg 326.000 1,300.00 423,800.00
Pasir beton kg 760 114.29 86,857.14
Kerikil kg 1029 120.00 123,480.00
(Maks 30mm)
Air Liter 215 75.00 16,125.00
JUMLAH HARGA BAHAN 650,262.14
C PERALATAN
A.4.1.1.12. Membuat 1 m3 beton mutu f’c = 31,2 MPa, slump (120 ± 20) mm
Uraian Kode Satuan Koefisien Harga Satuan Jumlah Harga (Rp)
No
(Rp)
A TENAGA
Pekerja L.01 OH 2.100 100,000.00 210,000.00
Tukang batu L.02 OH 0.350 120,000.00 42,000.00
Kepala tukang L.03 OH 0.035 150,000.00 5,250.00
Mandor L.04 OH 0.105 150,000.00 15,750.00
JUMLAH TENAGA KERJA 273,000.00
B BAHAN
Semen Portland kg 448.000 1,300.00 582,400.00
Pasir beton kg 667 114.29 76,228.57
Kerikil (Maks 30mm) kg 1000 120.00 120,000.00
Air Liter 215 75.00 16,125.00
JUMLAH HARGA BAHAN 794,753.57
C PERALATAN
Sewa concrete pump hari 0.0143 Err:509 Err:509
JUMLAH HARGA ALAT Err:509
1 2 3 4
I TENAGA KERJA
1 MANDOR HARI Rp 150,000.00
2 KEPALA TUKANG HARI Rp 150,000.00
3 TUKANG HARI Rp 120,000.00
4 PEKERJA HARI Rp 100,000.00
II BAHAN
A BAHAN STRUKTUR
1 PASIR URUG M3 Rp 65,000.00
2 PASIR PASANG M3 Rp 150,000.00
3 PASIR BETON / COR M3 Rp 160,000.00
4 PASIR BETON / COR Kg Rp 114.29
5 TANAH URUG / TIMBUN M3 Rp 50,000.00
6 TANAH HUMUS M3 Rp 150,000.00
7 RUMPUT GAJAH MINI M3 Rp 35,000.00
8 PAVING BLOCK 8 CM K 300 M2 Rp 98,000.00
9 KERIKIL / KORAL BETON M3 Rp 162,000.00
10 KERIKIL / KORAL BETON Kg Rp 120.00
11 BATU BATA MERAH (5X11X22) Bh Rp 550.00
12 SEMEN TYPE PCC (PORTLAND COMPOSIT CEMENT) Kg Rp 1,300.00
13 PORTLAND SEMEN WARNA Kg Rp 2,400.00
14 AIR Liter Rp 75.00
B BAHAN KAYU
1 KAYU KELAS I M3 Rp 4,500,000.00
2 KAYU KELS II M3 Rp 2,500,000.00
3 KAYU KELAS III M3 Rp 2,000,000.00
4 KAYU PAPAN M3 Rp 2,000,000.00
5 TRIPLEK / PLYWOOD 9 mm Lbr Rp 140,000.00
6 TRIPLEK / PLYWOOD 12 mm Lbr Rp 215,000.00
7 MULTIPLEK 8 mm Lbr Rp 90,000.00
8 MULTIPLEK 18 mm Lbr Rp 150,000.00
9 KAYU CEROCOK Dia 5-10 cm Btg Rp 57,700.00
10 KAYU DOLKEN Dia 5-10 cm Btg Rp 10,000.00
11 KAYU PERANCAH / BEKISTING M3 Rp 2,100,000.00
12 KAYU PROFIL M' Rp 8,800.00
13 PENJAGA JARAK BEKISTING Bh Rp 20,000.00
14 HPL M2 Rp 62,500.00
C BAHAN BESI
1 BESI BETON BIASA / POLOS Kg Rp 9,300.00
2 BESI BETON ULIR Kg Rp 9,800.00
3 KAWAT IKAT BETON Kg Rp 15,000.00
4 BESI HOLLOW 40X40x2 mm M' Rp 35,000.00
5 BESI HOLLOW 100X100x3.2 mm M' Rp 105,000.00
6 BESI WIREMESH M8 kg Rp 13,594.43
7 BESI WIREMESH M10 kg Rp 14,500.00
8 RAILING TANGGA M' Rp 750,000.00
9 BAJA STRUKTUR IWF KG Rp 18,400.00
10 BAJA STRUKTUR H BEAM KG Rp 16,800.00
11 BAJA PROFIL CNP KG Rp 10,500.00
12 BAJA RINGAN C75.100 M2 Rp 155,000.00
13 PLAT BORDES 1.2 mm KG Rp 12,000.00
14 PLAT BONDEK 0.75 mm M2 Rp 112,000.00
15 BAUT 7/8" A307 Bh Rp 47,000.00
16 BAUT 3/4" A325 Bh Rp 37,500.00
17 ANGKUR HTB 22 mm Bh Rp 62,000.00
NO JENIS BAHAN/UPAH SATUAN HARGA
1 2 3 4
D BAHAN ATAP
1 SENG GELOMBANG BJLS 20 K Lbr Rp 35,000.00
2 ATAP GENTENG METAL 0,35 mm M2 Rp 153,700.00
3 ATAP SENG SPANDEK 0.3 mm M2 Rp 56,000.00
4 ATAP GENTENG ZINCALUME 0.35 mm M2 Rp 75,000.00
5 ATAP GENTENG BETON Bh Rp 12,800.00
6 NOK ATAP GENTENG BETON M' Rp 44,100.00
E BAHAN PIPA
1 PIPA BESI 6" M' Rp 191,666.67
2 PIPA BESI 2" M' Rp 75,000.00
F BAHAN PAKU
1 PAKU ATAP GENTENG METAL Kg Rp 46,000.00
2 PAKU KAYU Kg Rp 23,100.00
3 PAKU SENG Kg Rp 27,000.00
4 PAKU ASBES Kg Rp 40,900.00
5 PAKU 1" Kg Rp 32,300.00
6 PAKU 2"-5" Kg Rp 15,000.00
7 PAKU GYPSUM Kg Rp 52,400.00
8 PAKU TRIPLEKS / TEAKWOOD Bh Rp 35,400.00
9 SEKRUP ATAP Bh Rp 1,100.00
10 SEKRUP GYPSUM / PAKU SEKRUP Bh Rp 600.00
G BAHAN FINISHING
1 CAT MINYAK Kg Rp 76,000.00
2 CAT TEMBOK INTERIOR Kg Rp 59,000.00
3 CAT TEMBOK EKSTERIOR Kg Rp 76,000.00
4 CAT VERNISH Kg Rp 97,100.00
5 CAT KAYU DASAR / MENI Kg Rp 34,500.00
6 MINYAK CAT / THINNER Kg Rp 32,000.00
7 DEMPUL Kg Rp 48,400.00
8 PLAMIR Kg Rp 64,700.00
9 KUAS 3" Bh Rp 18,500.00
10 KUAS 4" Bh Rp 18,500.00
11 KUAS 1" Bh Rp 10,700.00
12 KUAS GULUNG / ROL Bh Rp 51,200.00
13 MINYAK BEKISTING Ltr Rp 7,000.00
14 LEM KAYU Ltr Rp 23,500.00
15 SEALENT Tube Rp 30,000.00
16 LEM Kg Rp 15,000.00
17 MENI BESI Kg Rp 55,000.00
HITUNGAN VOLUME
PANJANG LEBAR TINGGI DIMENSI VOLUME
NO URAIAN PEKERJAAN KET JUMLAH BARIS
(m) (m) (m) lbr (m) tbl(m)
I PEKERJAAAN PENDAHULUAN
1 Pek. Pembersihan dan perataan lapangan 12.00 6.00 72.00 m2
II PEKERJAAAN PONDASI
1 Pek. Pondasi 3.00
a. Pek. Galian tanah 1.20 0.70 1.00 2.52 m3
b. Pek. Urugan pasir 1.00 0.50 0.05 0.08 m3
d. Pek. Pondasi beton bertulang K 250
- Bekisting Kolom Pedestal 0.30 0.30 1.00 3.60 m2
Telapak pondasi 1.00 0.50 0.25 2.25 m2
TOTAL 5.85 m2
- Pembesian Kolom Pedestal
- Tul. Sengkang D 8 8.53 1.20 8 0.39456 Kg/m 12.121 Kg
- Tul. Utama D 13 4.00 1.28 13 1.041885 Kg/m 16.003 Kg
Telapak pondasi
- Tul. Utama D 13 14.00 1.04 13 1.041885 Kg/m 45.510 Kg
- Tul. Utama D 13 8.00 4.30 13 1.041885 Kg/m 107.523 Kg
TOTAL 181.16 Kg
- Pekerjaan Beton Kolom Pedestal 0.30 0.30 1.00 0.27 m3
Telapak pondasi 1.00 0.50 0.25 0.38 m3
TOTAL 1.00 m3
III PEKERJAAAN STRUKTUR SHELTER
1 Pek. Tiang Kolom Steel Pipe Diameter 6" 3.00 2.50 7.500 m'
2 Pek. Rafter Steel Pipe Diameter 6" 3.00 5.60 16.800 m'
3 Pek. Balok Steel Pipe Diameter 6" 1.00 10.00 10.000 m'
4 Pek. Ring Balok Steel Pipe Diameter 2" 6.00 12.00 72.000 m'
5 Pek. Tempat Duduk Rangka Besi Hollow 40x40 9.85 0.575 5.664 m2
6 Pek. Pelat Besi Tebal 16 mm 3.00 2.10 0.5 129.5 Kg/m2 203.963 Kg
0.80 0.5 129.5 Kg/m2 77.700 Kg
TOTAL 281.66 Kg
IV PEKERJAAN ATAP
1 Pek. Pemasangan atap Seng Spandek 0,3 mm 12.00 6.00 72.00 m2
PILECAP Uk. 850x625x40 mm (F1) M3
Dimensi
Panjang (m)
Lebar Tebal
0.850 0.625 0.400
Beton
Besi
besi 16 Arah x 0.625
16 Arah y 0.850
besi 16 0.625
besi 16 Arah x 0.625
16 Arah y 0.850
Bekisting 0.850 0.625 0.400
00 mm (F2) M3
Koef. Besi Jarak
JML Volume SATUAN
1m' begel
0.508 PEMBAGI
1.000 m3
220.076 kg/m3
6.944 2.226 0.090 25.115 kg
20.313 2.984 0.080 37.881 kg
4.000 2.226 5.564 kg
5.000 2.226 0.125 18.083 kg
18.056 2.226 0.090 25.115 kg
4.431 m2/m3
00 mm (F3) M3
Koef. Besi Jarak
JML Volume SATUAN
1m' begel
0.121 PEMBAGI
1.000 m3
114.359 kg/m3
0.746 1.578 0.200 1.912 kg
13.000 1.578 0.125 3.059 kg
4.000 1.578 0.941 kg
0.994 1.578 0.150 2.549 kg
16.250 2.226 0.100 5.392 kg
14.645 m2/m3
m (K1) M3
Koef. Besi Jarak
JML Volume SATUAN
1m' begel
0.28 PEMBAGI
1.00 m3
134.62 kg/m3 2261.569
14.00 1.58 22.10 kg
3.00 0.62 0.10 2.03 kg
10.00 0.62 0.10 13.56 kg
7.86 m2/m3
m (K2) M3
Koef. Besi Jarak
JML Volume SATUAN
1m' begel
0.25 PEMBAGI
1.00 m3
141.40 kg/m3 Err:509
14.00 1.58 22.10 kg
3.00 0.62 0.10 0.92 kg
10.00 0.62 0.10 12.33 kg
8.00 m2/m3
mm
Koef. Besi Jarak
JML Volume SATUAN
1m' begel
0.15 PEMBAGI
1.00 m3
149.44 kg/m3 1120.797
3.00 1.58 4.73 kg
3.00 1.58 4.73 kg
10.00 0.62 0.10 12.95 kg
10.67 m2/m3
Jumlah Harga (Rp)
-
-
-
-
BAK
KONTRO
L
H.1 UK.60x60
x60 cm
#REF! TENAGA
A
#REF! Pekerja
#REF! Tukang
#REF! Mandor
#REF! JUMLAH TENAGA
B BAHAN KERJA
Galian m3 0.51
- Lantai m3 0.10
Pasanga m2 1.32
n dinding
1/2 Bata
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 10% x D (maksimum)
F 15%) Satuan Pekerjaan (D+E)
Harga
Harga Jumlah Harga (Rp)
Satuan
(Rp)
- -
- -
- -
UMLAH TENAGA -
ERJA
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
#REF! #REF!
UMLAH HARGA #REF!
AHAN
#REF!
% x D (maksimum) -
#REF!
Luas kusen Pintu dan jendela