REKAPITULASI RENCANA ANGGARAN BIAYA

ENGGINERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
THN ANGGARAN = 2019

NO. URAIAN PEKERJAAN HARGA

SEGMEN 1 STA 0+00 S.D STA 0+450


A PEKERJAAN PERSIAPAN Rp 100,073,300.00
B PEKERJAAN PEMBONGKARAN SALURAN LAMA DAN GALIAN SALURAN BARU Err:509
C PEKERJAAN PERBAIKAN JALAN KORIDOR PEMUDA MERDEKA Rp 4,376,411,700.00
D PEKERJAAN PENGADAAN DAN PEMASANGAN U-DITCH UK. ( 80 x 100 x 120 CM) TERMASUK PLAT TUT Err:509
E PEKERJAAN PENGADAAN DAN PEMASANGAN BALOK KANSTIN 30 X 30 X 21 CM Err:509
F PEKERJAAN PENGECATAN Rp 595,205,000.00
TOTAL 1

G PEKERJAAN GERBANG PASAR HONGKONG Err:509


H PEKERJAAN GERBANG MARGA TJA Err:509

JUMLAH Err:509
Total Rekap ( A) Err:509
PPN 10 % (B) Err:509
Total Biaya (A+B) Err:509
DIBULATKAN Err:509

EMPAT BELAS MILYAR DUA RATUS LIMA PULUH DELAPAN JUTA ENAM RATUS TIGA PULUH DUA
TERBILANG :
RIBU SEMBILAN RATUS RUPIAH

PPK PENATAAN BANGUNAN Pontianak, 23 Maret 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KORIDOR PEMUDA MERDEKA SEGMEN 1


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBD
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450
1 PEKERJAAN PERSIAPAN
A Management K3
1 Pengadaan SMK3 1.00 Ls K3 37,275,000.00 37,275,000.00
3 Pengadaan dan Pemasangan Pagar Pengaman 200.00 m2 A.2.2.1.2 545,399.00 109,079,800.00
B Pekerjaan Pendahuluan Sub Jumlah 146,354,800.00
1 Pemasangan Bowplank 400.00 m' A.2.2.1.4 106,283.00 42,513,200.00
2 Penyewaan Direksi Keet 1.00 Ls 15,000,000.00 15,000,000.00
3 Mobilisasi dan Demobilisasi 1.00 Ls 15,000,000.00 15,000,000.00
4 Pembersihan dan Perataan Lapangan m2 A.2.2.1.9 17,250.00
Sub Jumlah 72,513,200.00
Sub Total Jumlah
2 PEKERJAAN PEMBONGKARAN SALURAN LAMA DAN GALIAN SALURAN BARU
A Pekerjaan Pembongkaran Saluran Lama dan Galian Baru Saluran STA 0+00 s.d STA 0+25
- Pekerjaan Pembongkaran Beton Saluran 15.00 m3 A.2.2.1.13 2,468,176.00 37,022,640.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
B Pekerjaan Pembongkaran Saluran Lama dan Galian Baru Saluran STA 0+25 s.d STA 0+50
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
D Pekerjaan Pembongkaran Saluran Lama dan Galian Baru Saluran STA 0+50 s.d STA 0+75
- Pekerjaan Pembongkaran Beton Saluran 18.00 m3 A.2.2.1.13 2,468,176.00 44,427,168.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
E Pekerjaan Pembongkaran Saluran Lama dan Galian Baru Saluran STA 0+75 s.d STA 0+100
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
F Pekerjaan Pembongkaran Saluran Lama Dan Galian Baru Saluran STA 0+100 s.d STA 0+125
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
G Pekerjaan Pembongkaran Saluran Lama Dan Galian Baru Saluran STA 0+125 s.d STA 0+150
- Pekerjaan Pembongkaran Beton Saluran 18.00 m3 A.2.2.1.13 2,468,176.00 44,427,168.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75

Rencana Anggaran Biaya - 2


KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
H Pekerjaan Pembongkaran Saluran Lama Dan Galian Baru Saluran STA 0+150 s.d STA 0+175
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
I Pekerjaan Pembongkaran Saluran Lama STA 0+175 s.d STA 0+200
- Pekerjaan Pembongkaran Beton Saluran 15.00 m3 A.2.2.1.13 2,468,176.00 37,022,640.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
J Pekerjaan Pembongkaran Saluran Lama dan Galian STA 0+200 s.d STA 0+225
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
K Pekerjaan Pembongkaran Saluran Lama STA 0+225 s.d STA 0+250
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
L Pekerjaan Pembongkaran Saluran Lama STA 0+250 s.d STA 0+275
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
L Pekerjaan Pembongkaran Saluran Lama STA 0+275 s.d STA 0+300
- Pekerjaan Pembongkaran Beton Saluran 15.00 m3 A.2.2.1.13 2,468,176.00 37,022,640.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
M Pekerjaan Pembongkaran Saluran Lama STA 0+300 s.d STA 0+325
- Pekerjaan Pembongkaran Beton Saluran 15.00 m3 A.2.2.1.13 2,468,176.00 37,022,640.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
N Pekerjaan Pembongkaran Saluran Lama STA 0+325 s.d STA 0+350
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
O Pekerjaan Pembongkaran Saluran Lama STA 0+350 s.d STA 0+375
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00

Rencana Anggaran Biaya - 3


KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450
Sub Jumlah 27,532,292.03
P Pekerjaan Pembongkaran Saluran Lama STA 0+375 s.d STA 0+400
- Pekerjaan Pembongkaran Beton Saluran 12.00 m3 A.2.2.1.13 2,468,176.00 29,618,112.00
- Pekerjaan Galian Tanah 60.27 m3 A.2.3.1.2 165,082.50 9,949,522.28
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 446.00 m' A.2.3.1.11.a 35,489.00 15,828,094.00
- Pasir Alas tebal 5 cm 2.45 m3 A.2.3.1.11 240,235.00 588,575.75
- Pekerjaan Urugan Kembali Tanah 12.00 m3 A.2.3.1.9 97,175.00 1,166,100.00
Sub Jumlah 27,532,292.03
P Pekerjaan Pembongkaran Saluran Lama STA 0+400 s.d STA 0+413
- Pekerjaan Pembongkaran Beton Saluran 9.52 m3 A.2.2.1.13 2,468,176.00 23,493,086.44
- Pekerjaan Galian Tanah 31.87 m3 A.2.3.1.2 165,082.50 5,261,307.38
- Pangadaan dan Pemancangan Cerucuk ø8 - Panjang 4 meter 251.00 m' A.2.3.1.11.a 35,489.00 8,907,739.00
- Pasir Alas tebal 5 cm 1.30 m3 A.2.3.1.11 240,235.00 311,238.86
- Pekerjaan Urugan Kembali Tanah 6.35 m3 A.2.3.1.9 97,175.00 616,633.68
Sub Jumlah 15,096,918.92
sub total Jumlah
3 PEKERJAAN PERBAIKAN JALAN KORIDOR PEMUDA MERDEKA
A Pekerjaan Perbaikan Koridor STA 0+00 s.d STA 0+025
1 Beton Ready Mixed K-225 Tebal 10 cm 13.14 m3 A.4.1.1.7 1,665,064.14 21,871,450.07
2 Bekisting 131.36 m2 A.4.1.1.24.a 461,884.85 60,670,884.47
3 Plastik Cor 131.36 m2 - 2,700.00 354,658.50
4 Wire Mesh M5 1 Lapis 230.22 Kg A.4.1.1.19 19,787.48 4,555,507.92

5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 131.36 m2 A.4.4.3.58 353,349.93 46,414,280.25

6 Pemasangan Jalur Difabel ( Guiding Block ) m2 A.4.4.3.60 339,377.89 -


Sub Jumlah 133,866,781.22

Rencana Anggaran Biaya - 4


KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450

B Pekerjaan Perbaikan Koridor STA 0+025 s.d STA 0+050


1 Beton Ready Mixed K-225 Tebal 10 cm Lantai + Ramp 13.30 m3 A.4.1.1.7 1,665,064.14 22,150,348.32
2 Bekisting 133.03 m2 A.4.1.1.24.a 461,884.85 61,444,541.60
3 Plastik Cor 133.03 m2 - 2,700.00 359,181.00
4 Wire Mesh M5 1 Lapis 227.78 Kg A.4.1.1.19 19,787.48 4,507,230.10
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 133.03 m2 A.4.4.3.58 353,349.93 47,006,141.39
6 Pemasangan Jalur Difabel ( Guiding Block ) - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 135,467,442.40

C Pekerjaan Perbaikan Koridor STA 0+050 s.d STA 0+75


1 Beton Ready Mixed K-225 Tebal 10 cm 11.42 m3 A.4.1.1.7 1,665,064.14 19,018,362.66
2 Bekisting 133.03 m2 A.4.1.1.24.a 461,884.85 61,444,541.60
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 114.22 m2 A.4.4.3.58 353,349.93 40,359,629.18
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 120,822,533.43

D Pekerjaan Perbaikan Koridor STA 0+075 s.d STA 0+100


1 Beton Ready Mixed K-225 Tebal 10 cm 12.62 m3 A.4.1.1.7 1,665,064.14 21,016,439.64
2 Bekisting 114.22 m2 A.4.1.1.24.a 461,884.85 52,756,487.57
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 126.22 m2 A.4.4.3.58 353,349.93 44,599,828.35
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 118,372,755.56

E Pekerjaan Perbaikan Koridor STA 0+100 s.d STA 0+125


1 Beton Ready Mixed K-225 Tebal 10 cm 13.18 m3 A.4.1.1.7 1,665,064.14 21,948,875.56
2 Bekisting 131.82 m2 A.4.1.1.24.a 461,884.85 60,885,660.93
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 131.82 m2 A.4.4.3.58 353,349.93 46,578,587.97
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 129,413,124.45

F Pekerjaan Perbaikan Koridor STA 0+125 s.d STA 0+150


1 Beton Ready Mixed K-225 Tebal 10 cm 13.77 m3 A.4.1.1.7 1,665,064.14 22,921,273.02
2 Bekisting 137.66 m2 A.4.1.1.24.a 461,884.85 63,583,068.45
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 137.66 m2 A.4.4.3.58 353,349.93 48,642,151.57
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 135,146,493.04

G Pekerjaan Perbaikan Koridor STA 0+150 s.d STA 0+175


1 Beton Ready Mixed K-225 Tebal 10 cm 13.79 m3 A.4.1.1.7 1,665,064.14 22,952,909.24
2 Bekisting 137.85 m2 A.4.1.1.24.a 461,884.85 63,670,826.57
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 137.85 m2 A.4.4.3.58 353,349.93 48,709,288.06
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 135,333,023.87

G Pekerjaan Perbaikan Koridor STA 0+175 s.d STA 0+200


1 Beton Ready Mixed K-225 Tebal 10 cm 13.79 m3 A.4.1.1.7 1,665,064.14 22,956,239.36
2 Bekisting 137.87 m2 A.4.1.1.24.a 461,884.85 63,680,064.27
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 137.87 m2 A.4.4.3.58 353,349.93 48,716,355.06
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 135,352,658.69

Rencana Anggaran Biaya - 5


KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450
H Pekerjaan Perbaikan Koridor STA 0+200 s.d STA 0+225
1 Beton Ready Mixed K-225 Tebal 10 cm 12.12 m3 A.4.1.1.7 1,665,064.14 20,172,252.11
2 Bekisting 121.15 m2 A.4.1.1.24.a 461,884.85 55,957,349.58
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 121.15 m2 A.4.4.3.58 353,349.93 42,808,344.20
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 118,937,945.89

I Pekerjaan Perbaikan Koridor STA 0+225 s.d STA 0+250


1 Beton Ready Mixed K-225 Tebal 10 cm 12.78 m3 A.4.1.1.7 1,665,064.14 21,271,194.45
2 Bekisting 127.75 m2 A.4.1.1.24.a 461,884.85 59,005,789.59
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 127.75 m2 A.4.4.3.58 353,349.93 45,140,453.75
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 125,417,437.79

J Pekerjaan Perbaikan Koridor STA 0+250 s.d STA 0+275


1 Beton Ready Mixed K-225 Tebal 10 cm 13.52 m3 A.4.1.1.7 1,665,064.14 22,505,006.98
2 Bekisting 135.16 m2 A.4.1.1.24.a 461,884.85 62,428,356.33
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 135.16 m2 A.4.4.3.58 353,349.93 47,758,776.74
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 132,692,140.05

K Pekerjaan Perbaikan Koridor STA 0+275 s.d STA 0+300


1 Beton Ready Mixed K-225 Tebal 10 cm 12.53 m3 A.4.1.1.7 1,665,064.14 20,863,253.73
2 Bekisting 125.30 m2 A.4.1.1.24.a 461,884.85 57,874,171.71
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 125.30 m2 A.4.4.3.58 353,349.93 44,274,746.42
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 123,012,171.86

L Pekerjaan Perbaikan Koridor STA 0+300 s.d STA 0+325


1 Beton Ready Mixed K-225 Tebal 10 cm 13.27 m3 A.4.1.1.7 1,665,064.14 22,093,736.14
2 Bekisting 132.69 m2 A.4.1.1.24.a 461,884.85 61,287,500.75
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 132.69 m2 A.4.4.3.58 353,349.93 46,886,002.41
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 130,267,239.30
M Pekerjaan Perbaikan Koridor STA 0+325 s.d STA 0+350
1 Beton Ready Mixed K-225 Tebal 10 cm - m3 A.4.1.1.7 1,665,064.14 -
2 Bekisting m2 A.4.1.1.24.a 461,884.85 -
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 103.98 m2 A.4.4.3.58 353,349.93 36,739,559.13
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 36,739,559.13
N Pekerjaan Perbaikan Koridor STA 0+350 s.d STA 0+375
1 Beton Ready Mixed K-225 Tebal 10 cm - m3 A.4.1.1.7 1,665,064.14 -
2 Bekisting m2 A.4.1.1.24.a 461,884.85 -
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 112.87 m2 A.4.4.3.58 353,349.93 39,882,606.77
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 39,882,606.77

N Pekerjaan Perbaikan Koridor STA 0+375 s.d STA 0+400


1 Beton Ready Mixed K-225 Tebal 10 cm - m3 A.4.1.1.7 1,665,064.14 -
2 Bekisting m2 A.4.1.1.24.a 461,884.85 -

Rencana Anggaran Biaya - 6


KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
SEGMEN 1 STA 0+00 S.D STA 0+450
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 137.85 m2 A.4.4.3.58 353,349.93 48,709,288.06
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 48,709,288.06

0 Pekerjaan Perbaikan Koridor STA 0+400 s.d STA 0+413


1 Beton Ready Mixed K-225 Tebal 10 cm - m3 A.4.1.1.7 1,665,064.14 -
2 Bekisting m2 A.4.1.1.24.a 461,884.85 -
3 Plastik Cor m2 - 2,700.00 -
4 Wire Mesh Uk. M-5 (1 Lapis + beton deking) Kg A.4.1.1.19 19,787.48 -
5 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 72.71 m2 A.4.4.3.58 353,349.93 25,692,073.52
6 Pemasangan Jalur Difabel ( Guiding Block ) uk. 30 x 30 cm - m2 A.4.4.3.60 339,377.89 -
Sub Jumlah 25,692,073.52
4 PEKERJAAN PENGADAAN DAN PEMASANGAN U-DITCH + PLAT TUTUP U- DITCH K- 350
PEKERJAAN PENGADAAN DAN PEMASANGAN U-DITCH UK. ( 80 x 100 x 120 CM) TERMASUK
A
PLAT TUTUP U-DITCH FABRIKASI UK. ( 80 x 60) LIGHT DUTY
1 Pengadaan dan Pemasangan Saluran Drainase U-Ditch Termasuk Plat Tutup di STA 0+00 s.d STA 0+413 357 Unit A.4.5.3.32 3,180,612.50 1,135,478,662.50
Sub Jumlah 1,135,478,662.50
PEKERJAAN PENGADAAN DAN PEMASANGAN U-DITCH UK. ( 100 x 100 x 120 CM) TERMASUK
B
PLAT TUTUP U-DITCH FABRIKASI UK. ( 80 x 60) LIGHT DUTY
1 Pengadaan dan Pemasangan Saluran Drainase U-Ditch Termasuk Plat Tutup di STA 0+00 s.d STA 0+413 357 Unit A.4.5.3.32a 3,797,026.88 1,355,538,594.38
Sub Jumlah 1,355,538,594.38
5 PEKERJAAN PENGADAAN DAN PEMASANGAN BALOK KANSTIN 30 X 30 X 21 CM
1 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+00 s.d STA 0+025 m'
2 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+25 s.d STA 0+050 m'
3 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+50 s.d STA 0+75 m'
4 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+75 s.d STA 0+100 m'
5 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+100 s.d STA 0+125 m'
6 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+125 s.d STA 0+150 m'
7 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+150 s.d STA 0+175 m'
8 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+175 s.d STA 0+200 m'
9 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+200 s.d STA 0+225 m'
10 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+225 s.d STA 0+250 m'
11 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+250 s.d STA 0+275 m'
12 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+275 s.d STA 0+300 m'
13 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+300 s.d STA 0+325 m'
14 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+325 s.d STA 0+350 m'
15 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+350 s.d STA 0+375 m'
16 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+375 s.d STA 0+400 m'
17 Pengadaan dan Pemasangan Saluran Drainase Kanstin di STA 0+400 s.d STA 0+450 m'
Sub Jumlah -
6 PEKERJAAN PENGECATAN

1 Pengecatan Kanstin Koridor 540.00 m2 P.Ct. 01 111,609.61 60,269,187.67


Sub Jumlah 60,269,187.67
JUMLAH 4,376,411,719.57
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN 4,376,411,719.57

DIBULATKAN : TIGA MILYAR SEMBILAN RATUS TIGA PULUH DELAPAN JUTA ENAM RATUS ENAM PULUH LIMA RIBU TUJUH RATUS RUPIAH 4,376,411,700.00

Singkawang, Desember 2019


Dibuat Oleh:
Perencana Staf Teknis Diperiksa:
Perkimta Kota Singkawang Kepala Seksi Penataan
Bangunan dan Lingkungan

Dominicus Dwi Atmaja,. ST


Penata Muda ( III/a) Sonny Suryatmojo, ST
NIP: 19850806 201903 1 003 NIP.1976 05 09 201001 1 010

Mengetahui:
Kepala Dinas Perumahan ,Permukiman Menyetujui:
dan Pertanahan Kota Singkawang Kepala Bidang Permukiman
Rencana Anggaran Biaya - 7

Ir . Agus Priyatno
KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL
NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8
Mengetahui:
SEGMEN 1 STA Perumahan
Kepala Dinas 0+00 S.D STA 0+450
,Permukiman Menyetujui:
dan Pertanahan Kota Singkawang Kepala Bidang Permukiman

Ir . Agus Priyatno
NIP.19610127 199003 1 003 Ir . Abdul Muthalib,. Eng
Pembina ( IV/a)
NIP.19640215 199603 1 001

Rencana Anggaran Biaya - 8


LANTAI WIRE MESH KORIDOR PE
STA 0+000 S.D STA 0+025
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 23.32 x 2.00 x 0.10


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 46.61
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 79.85 x 1.00
V. Total Besi = 79.85 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+000 S.D STA 0+025
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 25.09 x 3.50 x 0.10


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 87.79
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 150.37 x 1.00
V. Total Besi = 150.37 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+025 S.D STA 0+050
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH
DIM LANTAI 22.73 x 2.00 x 0.10
Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 45.44
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 77.83 x 1.00
V. Total Besi = 77.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+025 S.D STA 0+050
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 25.02 x 3.50 x 0.10


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 87.54
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 149.95 x 1.00
V. Total Besi = 149.95 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+050 S.D STA 0+075
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 17.77 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 35.52
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 60.84 x 1.00
V. Total Besi = 60.84 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+050 S.D STA 0+075
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 22.98 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 80.40
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 137.73 x 1.00
V. Total Besi = 137.73 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+075 S.D STA 0+100
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 19.01 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 38.00
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 65.09 x 1.00
V. Total Besi = 65.09 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+075 S.D STA 0+100
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+100 S.D STA 0+125
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 21.81 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 43.60
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 74.68 x 1.00
V. Total Besi = 74.68 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+100 S.D STA 0+125
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+125 S.D STA 0+150
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 24.68 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 49.33
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 84.51 x 1.00
V. Total Besi = 84.51 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+125 S.D STA 0+150
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG
LANTAI WIRE MESH KORIDOR PE
STA 0+150 S.D STA 0+175
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 25.00 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 49.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 85.60 x 1.00
V. Total Besi = 85.60 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+150 S.D STA 0+175
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+175 S.D STA 0+200
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH
DIM LANTAI 25.01 x 2.00 x 0.11
Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 49.99
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 85.64 x 1.00
V. Total Besi = 85.64 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+175 S.D STA 0+200
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+200 S.D STA 0+225
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 16.30 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 32.58
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 55.81 x 1.00
V. Total Besi = 55.81 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+200 S.D STA 0+225
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+225 S.D STA 0+250
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 25.00 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 49.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 85.60 x 1.00
V. Total Besi = 85.60 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+225 S.D STA 0+250
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+250 S.D STA 0+275
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 13.22 x 2.00 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 26.42
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 45.26 x 1.00
V. Total Besi = 45.26 KG

LANTAI WIRE MESH KORIDOR PE


STA 0+250 S.D STA 0+275
Wire Mesh Lantai M5 1 lapis
PEMBESIAN WIRE MESH LANTAI MELINTANG STANDART/BUAH

DIM LANTAI 26.00 x 3.50 x 0.11


Panjang lebar Tebal Lantai
Notasi
(m) (m) (buah)
a b c
1.00 90.97
KEBUTUHAN BESI = JUMLAH PASANGAN X TOTAL KG BESI DIPERLUKAN
= 155.83 x 1.00
V. Total Besi = 155.83 KG
KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 79.85 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 150.37 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 77.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 149.95 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 60.84 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 137.73 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 65.09 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA


Trotoar Bagian Kanan
Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 74.68 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 84.51 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS
KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 85.60 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 85.64 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 55.81 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 85.60 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA


Trotoar Bagian Kanan
Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kiri


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 45.26 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS

KORIDOR PEMUDA MERDEKA

Trotoar Bagian Kanan


Koef Berat
selimut btn 0.05 Jenis cm
Diameter Besi Berat/ m M-5 Berat Jenis Volume/Buah
Keterangan
(mm) (kg.m) (Kg) (Kg)
d e f=excxb g
5.00 0.154 11.111 155.83 Tulangan Wire Mesh
L KG BESI DIPERLUKAN
LAPIS
PERHITUNGAN VOLUME
PEKERJAAN PENATAAN KORIDOR JALAN PEMUDA MERDEKA SAMPAI JEMBATAN
TAHUN ANGGARAN 2019
GALIAN TANAH
DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M2)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.760 19.000 1.230
25.000 1.200 30.000 1.230

2 STA 0.25+0.50 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

3 STA 0.50+0.75 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

4 STA 0.75+0.100 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

5 STA 0.100+0.125 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

6 STA 0.125+0.150 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

7 STA 0.150+0.175 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

8 STA 0.175+0.200 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

9 STA 0.200+0.225 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

10 STA 0.225+0.250 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

11 STA 0.250+0.275 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

12 STA 0.275+0.300 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

13 STA 0.300+0.325 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230
14 STA 0.325+0.350 25.000 0.760 19.000 1.230
25.000 1.200 30.000 1.230

15 STA 0.350+0.375 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

16 STA 0.375+0.400 25.000 0.760 19.000 1.230


25.000 1.200 30.000 1.230

17 STA 0.400+0.413 13.220 0.760 10.047 1.230


13.220 1.200 15.864 1.230

PEMANCANGAN DOLKEN
DIMENSI
ARAH Y
No LOKASI
PANJANG LEBAR JRK PASANG
(M) (M) (M) (BH)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.760 0.300 85.000
25.000 1.200 0.300 85.000

2 STA 0.25+0.50 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

3 STA 0.50+0.75 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

4 STA 0.75+0.100 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

5 STA 0.100+0.125 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

6 STA 0.125+0.150 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

7 STA 0.150+0.175 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000
8 STA 0.175+0.200 25.000 0.760 0.300 85.000
25.000 1.200 0.300 85.000

9 STA 0.200+0.225 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

10 STA 0.225+0.250 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

11 STA 0.250+0.275 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

12 STA 0.275+0.300 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

13 STA 0.300+0.325 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

14 STA 0.325+0.350 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

15 STA 0.350+0.375 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

16 STA 0.375+0.400 25.000 0.760 0.300 85.000


25.000 1.200 0.300 85.000

17 STA 0.400+0.413 13.220 0.760 0.300 46.000


13.220 1.200 0.300 46.000

PENGURUGAN PASIR ALAS TEBAL 5 CM


DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M2)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.760 19.000 0.050
25.000 1.200 30.000 0.050

2 STA 0.25+0.50 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050
3 STA 0.50+0.75 25.000 0.760 19.000 0.050
25.000 1.200 30.000 0.050

4 STA 0.75+0.100 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

5 STA 0.100+0.125 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

6 STA 0.125+0.150 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

7 STA 0.150+0.175 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

8 STA 0.175+0.200 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

9 STA 0.200+0.225 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

10 STA 0.225+0.250 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

11 STA 0.250+0.275 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

12 STA 0.275+0.300 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

13 STA 0.300+0.325 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

14 STA 0.325+0.350 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

15 STA 0.350+0.375 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

16 STA 0.375+0.400 25.000 0.760 19.000 0.050


25.000 1.200 30.000 0.050

17 STA 0.400+0.413 13.220 0.760 10.047 0.050


13.220 1.200 15.864 0.050
PENGURUGAN TANAH KEMBALI
DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M2)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.600 15.000 0.400
25.000 0.600 15.000 0.400

2 STA 0.25+0.50 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

3 STA 0.50+0.75 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

4 STA 0.75+0.100 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

5 STA 0.100+0.125 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

6 STA 0.125+0.150 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

7 STA 0.150+0.175 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

8 STA 0.175+0.200 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

9 STA 0.200+0.225 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

10 STA 0.225+0.250 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

11 STA 0.250+0.275 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

12 STA 0.275+0.300 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

13 STA 0.300+0.325 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

14 STA 0.325+0.350 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

15 STA 0.350+0.375 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

16 STA 0.375+0.400 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

17 STA 0.400+0.413 13.220 0.600 7.932 0.400


13.220 0.600 7.932 0.400

PEMBONGKARAN BETON SALURAN LAMA


DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M2)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.600 15.000 0.500
25.000 0.600 15.000 0.500

2 STA 0.25+0.50 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

3 STA 0.50+0.75 25.000 0.600 15.000 0.600


25.000 0.600 15.000 0.600

4 STA 0.75+0.100 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

5 STA 0.100+0.125 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

6 STA 0.125+0.150 25.000 0.600 15.000 0.600


25.000 0.600 15.000 0.600

7 STA 0.150+0.175 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400
8 STA 0.175+0.200 25.000 0.600 15.000 0.500
25.000 0.600 15.000 0.500

9 STA 0.200+0.225 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

10 STA 0.225+0.250 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

11 STA 0.250+0.275 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

12 STA 0.275+0.300 25.000 0.600 15.000 0.500


25.000 0.600 15.000 0.500

13 STA 0.300+0.325 25.000 0.600 15.000 0.500


25.000 0.600 15.000 0.500

14 STA 0.325+0.350 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

15 STA 0.350+0.375 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

16 STA 0.375+0.400 25.000 0.600 15.000 0.400


25.000 0.600 15.000 0.400

17 STA 0.400+0.413 13.220 0.600 7.932 0.600


13.220 0.600 7.932 0.600

PEMASANGAN BEKISTING LANTAI


DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M)
SEGMEN 1
1 STA 0.00+0.25 23.320 2.000 46.640 1.000
24.090 3.500 84.315 1.000
1.000 0.400 0.400 1.000
KALAU FULL S1 22.730
KALAU FULL S2 25.020
2 STA 0.25+0.50 22.730 2.000 45.460 1.000
25.020 3.500 87.570 1.000

KALAU FULL S1 24.200


KALAU FULL S2 25.010
3 STA 0.50+0.75 17.770 2.000 35.540 1.000
21.980 3.500 76.930 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 22.090


KALAU FULL S2 25.000
4 STA 0.75+0.100 19.010 2.000 38.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
5 STA 0.100+0.125 21.810 2.000 43.620 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 24.680


KALAU FULL S2 25.000
6 STA 0.125+0.150 24.680 2.000 49.360 1.000
25.000 3.500 87.500 1.000
1.000 0.400 0.400 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
7 STA 0.150+0.175 25.000 2.000 50.000 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
8 STA 0.175+0.200 25.010 2.000 50.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000
KALAU FULL S1 25.000
KALAU FULL S2 25.000
9 STA 0.200+0.225 16.300 2.000 32.600 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
10 STA 0.225+0.250 19.600 2.000 39.200 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 24.990


KALAU FULL S2 25.000
11 STA 0.250+0.275 23.480 2.000 46.960 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
12 STA 0.275+0.300 18.550 2.000 37.100 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
13 STA 0.300+0.325 22.420 2.000 44.840 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 29.020
14 STA 0.325+0.350 19.490 2.000 38.980 1.000
18.270 3.500 63.945 1.000
1.000 0.350 0.350 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
15 STA 0.350+0.375 12.510 2.000 25.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
16 STA 0.375+0.400 25.000 2.000 50.000 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 13.220


KALAU FULL S2 13.220
17 STA 0.400+0.413 13.220 2.000 26.440 1.000
13.220 3.500 46.270 1.000

PENGECORAN LANTAI DAN RAMP


DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M)
SEGMEN 1
1 STA 0.00+0.25 23.320 2.000 46.640 0.100
24.090 3.500 84.315 0.100
1.000 0.400 0.400 0.100

KALAU FULL S1 22.730


KALAU FULL S2 25.020
2 STA 0.25+0.50 22.730 2.000 45.460 0.100
25.020 3.500 87.570 0.100

KALAU FULL S1 24.200


KALAU FULL S2 25.010
3 STA 0.50+0.75 17.770 2.000 35.540 0.100
21.980 3.500 76.930 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 22.090


KALAU FULL S2 25.000
4 STA 0.75+0.100 19.010 2.000 38.020 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.010


KALAU FULL S2 25.000
5 STA 0.100+0.125 21.810 2.000 43.620 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 24.680


KALAU FULL S2 25.000
6 STA 0.125+0.150 24.680 2.000 49.360 0.100
25.000 3.500 87.500 0.100
1.000 0.400 0.400 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
7 STA 0.150+0.175 25.000 2.000 50.000 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.010


KALAU FULL S2 25.000
8 STA 0.175+0.200 25.010 2.000 50.020 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
9 STA 0.200+0.225 16.300 2.000 32.600 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.010


KALAU FULL S2 25.000
10 STA 0.225+0.250 19.600 2.000 39.200 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 24.990


KALAU FULL S2 25.000
11 STA 0.250+0.275 23.480 2.000 46.960 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
12 STA 0.275+0.300 18.550 2.000 37.100 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
13 STA 0.300+0.325 22.420 2.000 44.840 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 29.020
14 STA 0.325+0.350 19.490 2.000 38.980 0.100
18.270 3.500 63.945 0.100
1.000 0.350 0.350 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
15 STA 0.350+0.375 12.510 2.000 25.020 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 25.000


KALAU FULL S2 25.000
16 STA 0.375+0.400 25.000 2.000 50.000 0.100
25.000 3.500 87.500 0.100
1.000 0.350 0.350 0.100

KALAU FULL S1 13.220


KALAU FULL S2 13.220
17 STA 0.400+0.413 13.220 2.000 26.440 0.100
13.220 3.500 46.270 0.100
JUMLAH PEMASANGAN U- DITCH PER STA
DIMENSI
TINGGI U-
PANJANG 1 U Ditch
No LOKASI
PANJANG LEBAR -DITCH
(M) (M) (M) (M)
SEGMEN 1
1 STA 0.00+0.25 25.000 0.800 1.200 1.000
25.000 1.200 1.200 1.000

2 STA 0.25+0.50 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

3 STA 0.50+0.75 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

4 STA 0.75+0.100 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

5 STA 0.100+0.125 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

6 STA 0.125+0.150 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

7 STA 0.150+0.175 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

8 STA 0.175+0.200 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

9 STA 0.200+0.225 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

10 STA 0.225+0.250 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

11 STA 0.250+0.275 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

12 STA 0.275+0.300 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000
13 STA 0.300+0.325 25.000 0.800 1.200 1.000
25.000 1.200 1.200 1.000

14 STA 0.325+0.350 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

15 STA 0.350+0.375 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

16 STA 0.375+0.400 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

17 STA 0.400+0.413 25.000 0.800 1.200 1.000


25.000 1.200 1.200 1.000

PEMASANGAN LANTAI ANDESITE 30/60


DIMENSI
TINGGI
No LOKASI PANJANG LEBAR LUAS
(M) (M) (M2) (M)
SEGMEN 1
1 STA 0.00+0.25 23.320 2.000 46.640 1.000
24.090 3.500 84.315 1.000
1.000 0.400 0.400 1.000

KALAU FULL S1 22.730


KALAU FULL S2 25.020
2 STA 0.25+0.50 22.730 2.000 45.460 1.000
25.020 3.500 87.570 1.000

KALAU FULL S1 24.200


KALAU FULL S2 25.010
3 STA 0.50+0.75 17.770 2.000 35.540 1.000
21.980 3.500 76.930 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 22.090


KALAU FULL S2 25.000
4 STA 0.75+0.100 19.010 2.000 38.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
5 STA 0.100+0.125 21.810 2.000 43.620 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 24.680


KALAU FULL S2 25.000
6 STA 0.125+0.150 24.680 2.000 49.360 1.000
25.000 3.500 87.500 1.000
1.000 0.400 0.400 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
7 STA 0.150+0.175 25.000 2.000 50.000 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
8 STA 0.175+0.200 25.010 2.000 50.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
9 STA 0.200+0.225 16.300 2.000 32.600 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.010


KALAU FULL S2 25.000
10 STA 0.225+0.250 19.600 2.000 39.200 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000
KALAU FULL S1 24.990
KALAU FULL S2 25.000
11 STA 0.250+0.275 23.480 2.000 46.960 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
12 STA 0.275+0.300 18.550 2.000 37.100 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
13 STA 0.300+0.325 22.420 2.000 44.840 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 29.020
14 STA 0.325+0.350 19.490 2.000 38.980 1.000
18.270 3.500 63.945 1.000
1.000 0.350 0.350 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
15 STA 0.350+0.375 12.510 2.000 25.020 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 25.000


KALAU FULL S2 25.000
16 STA 0.375+0.400 25.000 2.000 50.000 1.000
25.000 3.500 87.500 1.000
1.000 0.350 0.350 1.000

KALAU FULL S1 13.220


KALAU FULL S2 13.220
17 STA 0.400+0.413 13.220 2.000 26.440 1.000
13.220 3.500 46.270 1.000
GAN VOLUME
MERDEKA SAMPAI JEMBATAN ANGEN SINGKAWANG
GGARAN 2019

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M3)

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN
23.370 1.000 23.370 SISI KIRI
36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

23.370 1.000 23.370 SISI KIRI


36.900 1.000 36.900 SISI KANAN

12.358 1.000 12.358 SISI KIRI


19.513 1.000 19.513 SISI KANAN

TOTAL M3 (A) 386.278


TOTAL M3 (B) 609.913
TOTAL M3 996.191

ARAH X PJG DOLKEN VOLUME KETERANGAN

(BH) (M) (M')

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN
4.000 4.000 356 SISI KIRI
5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 356 SISI KIRI


5.000 1.000 90 SISI KANAN

4.000 4.000 200 SISI KIRI


5.000 1.000 51 SISI KANAN

TOTAL M3 (A) 5,896.000


TOTAL M3 (B) 1,491.000
TOTAL M3 7,387.000

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M3)

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN
0.950 1.000 0.950 SISI KIRI
1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.950 1.000 0.950 SISI KIRI


1.500 1.000 1.500 SISI KANAN

0.502 1.000 0.502 SISI KIRI


0.793 1.000 0.793 SISI KANAN

TOTAL M3 (A) 15.702


TOTAL M3 (B) 24.793
TOTAL M3 40.496

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M3)

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

3.173 1.000 3.173 SISI KIRI


3.173 1.000 3.173 SISI KANAN

TOTAL M3 (A) 99.173


TOTAL M3 (B) 99.173
TOTAL M3 198.346

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M3)

7.500 1.000 7.500 SISI KIRI


7.500 1.000 7.500 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

9.000 1.000 9.000 SISI KIRI


9.000 1.000 9.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

9.000 1.000 9.000 SISI KIRI


9.000 1.000 9.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN
7.500 1.000 7.500 SISI KIRI
7.500 1.000 7.500 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

7.500 1.000 7.500 SISI KIRI


7.500 1.000 7.500 SISI KANAN

7.500 1.000 7.500 SISI KIRI


7.500 1.000 7.500 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

6.000 1.000 6.000 SISI KIRI


6.000 1.000 6.000 SISI KANAN

4.759 1.000 4.759 SISI KIRI


4.759 1.000 4.759 SISI KANAN

TOTAL M3 (A) 112.759


TOTAL M3 (B) 112.759
TOTAL M3 225.518

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M2)

1.000 46.640 SISI KIRI TROTOAR


1.000 84.315 SISI KANAN
1.000 0.400 RAMP KIRI TROTOAR
1.000 45.460 SISI KIRI
1.000 87.570 SISI KANAN

1.000 35.540 SISI KIRI


1.000 76.930 SISI KANAN
5.000 1.750 RAMP KIRI TROTOAR

1.000 38.020 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 43.620 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 49.360 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.800 RAMP KANAN TROTOAR

1.000 50.000 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 50.020 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR
1.000 32.600 SISI KIRI
1.000 87.500 SISI KANAN
3.000 1.050 RAMP KIRI TROTOAR

1.000 39.200 SISI KIRI


1.000 87.500 SISI KANAN
3.000 1.050 RAMP KIRI TROTOAR

1.000 46.960 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 37.100 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 44.840 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 38.980 SISI KIRI


1.000 63.945 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR
2.000 0.700 RAMP KANAN TROTOAR

1.000 25.020 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 50.000 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 26.440 SISI KIRI


1.000 46.270 SISI KANAN

TOTAL M3 (A) 699.800


TOTAL M3 (B) 1,409.030
TOTAL M3 2,108.830

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M2)

1.000 4.664 SISI KIRI TROTOAR


1.000 8.432 SISI KANAN
1.000 0.040 RAMP KIRI TROTOAR

1.000 4.546 SISI KIRI


1.000 8.757 SISI KANAN

1.000 3.554 SISI KIRI


1.000 7.693 SISI KANAN
5.000 0.175 RAMP KIRI TROTOAR
1.000 3.802 SISI KIRI
1.000 8.750 SISI KANAN
2.000 0.070 RAMP KIRI TROTOAR

1.000 4.362 SISI KIRI


1.000 8.750 SISI KANAN
2.000 0.070 RAMP KIRI TROTOAR

1.000 4.936 SISI KIRI


1.000 8.750 SISI KANAN
2.000 0.080 RAMP KANAN TROTOAR

1.000 5.000 SISI KIRI


1.000 8.750 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR

1.000 5.002 SISI KIRI


1.000 8.750 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR

1.000 3.260 SISI KIRI


1.000 8.750 SISI KANAN
3.000 0.105 RAMP KIRI TROTOAR

1.000 3.920 SISI KIRI


1.000 8.750 SISI KANAN
3.000 0.105 RAMP KIRI TROTOAR
1.000 4.696 SISI KIRI
1.000 8.750 SISI KANAN
2.000 0.070 RAMP KIRI TROTOAR

1.000 3.710 SISI KIRI


1.000 8.750 SISI KANAN
2.000 0.070 RAMP KIRI TROTOAR

1.000 4.484 SISI KIRI


1.000 8.750 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR

1.000 3.898 SISI KIRI


1.000 6.395 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR
2.000 0.070 RAMP KANAN TROTOAR

1.000 2.502 SISI KIRI


1.000 8.750 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR

1.000 5.000 SISI KIRI


1.000 8.750 SISI KANAN
1.000 0.035 RAMP KIRI TROTOAR

1.000 2.644 SISI KIRI


1.000 4.627 SISI KANAN
TOTAL M3 (A) 69.980
TOTAL M3 (B) 140.903
TOTAL M3 210.883

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(BH) (Bh) (M3)

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN
21.000 1.000 21.000 SISI KIRI
21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

21.000 1.000 21.000 SISI KIRI


21.000 1.000 21.000 SISI KANAN

TOTAL M3 (A) 357.000


TOTAL M3 (B) 357.000
TOTAL M3 714.000

VOLUME PER
JUMLAH SISI VOLUME KETERANGAN
BUAH
(M3) (Bh) (M2)

1.000 46.640 SISI KIRI TROTOAR


1.000 84.315 SISI KANAN
1.000 0.400 RAMP KIRI TROTOAR

1.000 45.460 SISI KIRI


1.000 87.570 SISI KANAN

1.000 35.540 SISI KIRI


1.000 76.930 SISI KANAN
5.000 1.750 RAMP KIRI TROTOAR
1.000 38.020 SISI KIRI
1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 43.620 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 49.360 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.800 RAMP KANAN TROTOAR

1.000 50.000 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 50.020 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 32.600 SISI KIRI


1.000 87.500 SISI KANAN
3.000 1.050 RAMP KIRI TROTOAR

1.000 39.200 SISI KIRI


1.000 87.500 SISI KANAN
3.000 1.050 RAMP KIRI TROTOAR
1.000 46.960 SISI KIRI
1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 37.100 SISI KIRI


1.000 87.500 SISI KANAN
2.000 0.700 RAMP KIRI TROTOAR

1.000 44.840 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 38.980 SISI KIRI


1.000 63.945 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR
2.000 0.700 RAMP KANAN TROTOAR

1.000 25.020 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 50.000 SISI KIRI


1.000 87.500 SISI KANAN
1.000 0.350 RAMP KIRI TROTOAR

1.000 26.440 SISI KIRI


1.000 46.270 SISI KANAN
TOTAL M3 (A) 699.800
TOTAL M3 (B) 1,409.030
TOTAL M3 2,108.830
ANALISA HARGA SATUAN
PEKERJAAN PERSIAPAN
A.2.2.1 Harga Satuan Pekerjaan Persiapan

A.2.2.1.2 (K3) Pembuatan 1 m2 pagar sementara dari Banner / Baliho Tinggi 2 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.200
Tukang Kayu L.02 OH 0.400
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Dolken Kayu 8-10/400 cm Batang 1.250
Banner / Baliho/ Spnaduk m2 4.800
Kayu 5/7 panjang 2 m m3 0.072
Paku Biasa 2"-5" Kg 0.060
Cat Kayu Liter 0.450
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.4 Pengukuran dan pemasangan 1m Bouwplank

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kayu balok 5/7 m3 0.012
Paku 2"-3" Kg 0.020
Kayu papan 3/20 m3 0.007
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.9 (K3) Pembersihan 1 m2 lapangan atau perataan

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.2.1.13 Pembongkaran 1 m3 beton bertulang

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 13.334
Mandor L.04 OH 0.666
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
Jack Hammer sewa-hari 0.35
JUMLAH HARGA ALAT
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

PEKERJAAN TANAH
A.2.3.1.2 Penggalian 1m3 tanah biasa sedalam 2 m

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.900
Mandor L.04 OH 0.045
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.9 Pengurugan kembali 1 m3 galian tanah

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.500
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.2.3.1.11 Pengurugan 1 m3 dengan pasir urug

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.300
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Pasir urug 1.200
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

PEKERJAAN PEMANCANGAN
A.2.3.1.11.a Pemancangan Dolken ø8 -10n cm - Panjang 4 Meter

No Uraian Kode Satuan Koefisien


A TENAGA
1 Pekerja L.01 OH 0.100
2 Mandor L.04 OH 0.025
JUMLAH TENAGA KERJA
B BAHAN
1 Kayu cerucuk dia. 8-10 cm pjg 4 m m³ 1.100
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A+B+C)
E Overhead & Profit (Contoh 15%) 15% x D
F Harga Satuan Pekerjaan (D+E)

PEKERJAAN BETON BERTULANG


A.4.1.1.7 Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58 ( Ready Mixed)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.650
Tukang batu L.02 OH 0.275
Kepala tukang L.03 OH 0.028
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000
Pasir beton Kg 698.000
Kerikil (maks 30 mm) Kg 1047.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.7a Membuat 1m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm ,w/c = 0,58 (menggunakan molen)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 1.323
Tukang batu L.02 OH 0.189
Kepala tukang L.03 OH 0.019
Mandor L.04 OH 0.066
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000
Pasir beton Kg 698.000
Kerikil (maks 30 mm) Kg 1047.000
Air Liter 215.000
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Molen sewa-hari 0.250

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.17. Pembesian 1 Kg dengan besi polos atau besi ulir

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.070
Tukang besi L.02 OH 0.070
Kepala tukang L.03 OH 0.007
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Besi beton (Polos/ulir) Kg 10.500
Kawat beton Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
G Harga Satuan Pekerjaan per 1Kg besi

A.4.1.1.19 Pemasangan 10 Kg jaring kawat baja (wiremesh)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.025
Tukang besi L.02 OH 0.025
Kepala tukang L.03 OH 0.025
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jaring kawat baja dilas Kg 10.200
Kawat beton Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan 10 Kg ( D + E )
G Harga Satuan Pekerjaan 1 Kg ( D + E )

A.4.1.1.24 (K3) Pemasangan 1m2 bekisting untuk lantai

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
Plywood tebal 9 mm Lbr 0.350
Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.1.1.24.a Pemasangan 1m2 bekisting untuk lantai (papan mal)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.660
Tukang kayu L.02 OH 0.330
Kepala tukang L.03 OH 0.033
Mandor L.04 OH 0.033
JUMLAH TENAGA KERJA
B BAHAN
Kayu kelas III m3 0.040
Paku 5 - 12 cm Kg 0.400
Minyak bekisting Liter 0.200
Balok kayu kelas II m3 0.015
Papan Mal kelas III m3 0.013
Dolken kayu galam, ɸ(8-10)cm 4 m Batang 6.000
JUMLAH HARGA BAHAN
C PERALATAN

D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

PEKERJAAN PENUTUP LANTAI


A.4.4.3.58 Pemasangan 1 m2 lantai andesit bintik bakar 30/60

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu Andesit Bintik bakar 30/60 Buah 5.556
Semen portland Kg 11.750
pasir pasang m3 0.035
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
A.4.4.3.60 Pemasangan 1 m2 Guiding Block ( Jalur Difabel)

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.700
Tukang batu L.02 OH 0.350
Kepala tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Guding Block 30/30 Buah 11.111
Semen portland Kg 11.750
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

PEKERJAAN SALURAN DRAINASE


A.4.5.3.32 Pengadaan dan Pemasangan 1 Unit U Ditch + Plat Tutup U Ditch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
U- Ditch Uk. ( 80 x 100 x 120 CM) K-350 Unit 1.000
Plat Tutup U- Ditch ( 80 x 60) LD Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )

A.4.5.3.32a Pengadaan dan Pemasangan 1 Unit U Ditch + Plat Tutup U Ditch

No Uraian Kode Satuan Koefisien

A TENAGA
Pekerja L.01 OH 0.250
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
U- Ditch Uk. ( 100 x 100 x 120 CM) K-350 Unit 1.000
Plat Tutup U- Ditch ( 80 x 60) LD Unit 1.000
JUMLAH HARGA BAHAN
C PERALATAN

JUMLAH HARGA ALAT


D Jumlah (A + B + C)
E Overhead & Provit 15% x D
F Harga Satuan Pekerjaan ( D + E )
TUAN

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 30,000.00 Pekerja


160,000.00 64,000.00 Tukang Kayu
190,000.00 3,800.00 Kepala Tukang
190,000.00 3,800.00 Mandor
JUMLAH TENAGA KERJA 101,600.00

13,800.00 17,250.00 Dolken Kayu 8-10/4


35,000.00 168,000.00
2,377,500.00 171,180.00 Kayu 5/7
23,000.00 1,380.00
33,000.00 14,850.00
JUMLAH HARGA BAHAN 372,660.00

JUMLAH HARGA ALAT


474,260.00
D 71,139.00
545,399.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 15,000.00
160,000.00 16,000.00
190,000.00 1,900.00
190,000.00 950.00
JUMLAH TENAGA KERJA 33,850.00
4,755,000.00 57,060.00
23,000.00 460.00
150,000.00 1,050.00
JUMLAH HARGA BAHAN 58,570.00

JUMLAH HARGA ALAT


92,420.00
D 13,863.00
106,283.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 15,000.00
190,000.00 9,500.00
JUMLAH TENAGA KERJA 15,000.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


15,000.00
D 2,250.00
17,250.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 2,000,100.00
190,000.00 126,540.00
JUMLAH TENAGA KERJA 2,126,640.00

JUMLAH HARGA BAHAN

56,000.00 19,600.00
JUMLAH HARGA ALAT 19,600.00
2,146,240.00
D 321,936.00
2,468,176.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 135,000.00
190,000.00 8,550.00
JUMLAH TENAGA KERJA 143,550.00

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT


143,550.00
D 21,532.50
165,082.50

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 75,000.00
190,000.00 9,500.00
JUMLAH TENAGA KERJA 84,500.00

JUMLAH HARGA BAHAN


JUMLAH HARGA ALAT
84,500.00
D 12,675.00
97,175.00

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 45,000.00
190,000.00 1,900.00
JUMLAH TENAGA KERJA 46,900.00

135,000.00 162,000.00
JUMLAH HARGA BAHAN 162,000.00

JUMLAH HARGA ALAT


208,900.00
D 31,335.00
240,235.00

Harga Satuan (Rp) Jumlah Harga (Rp)

150,000.00 15,000.00
190,000.00 4,750.00
LAH TENAGA KERJA 19,750.00

10,100.00 11,110.00
LAH HARGA BAHAN 11,110.00

LAH HARGA ALAT


30,860.00
4,629.00
35,489.00

Ready Mixed)
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

150,000.00 247,500.00
160,000.00 44,000.00
190,000.00 5,320.00
190,000.00 15,770.00
JUMLAH TENAGA KERJA 312,590.00
Bahan
1,725.00 639,975.00 Semen Portland 1,500.00
102.68 71,669.64 Pasir beton 89.29
404.63 423,647.22 Kerikil (maks 30 m 351.85

JUMLAH HARGA BAHAN 1,135,291.87

JUMLAH HARGA ALAT


1,447,881.87
D 217,182.28
1,665,064.14

menggunakan molen)
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

150,000.00 198,450.00
160,000.00 30,240.00
190,000.00 3,610.00
190,000.00 12,540.00
JUMLAH TENAGA KERJA 244,840.00

1,725.00 639,975.00
102.68 71,669.64
404.63 423,647.22

JUMLAH HARGA BAHAN 1,135,291.87

36,000.00 9,000.00
JUMLAH HARGA ALAT 9,000.00
1,389,131.87
D 208,369.78
1,597,501.64

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 10,500.00
160,000.00 11,200.00
190,000.00 1,330.00
190,000.00 760.00
JUMLAH TENAGA KERJA 23,790.00

15,500.00 162,750.00
25,500.00 3,825.00
JUMLAH HARGA BAHAN 166,575.00

-
JUMLAH HARGA ALAT -
190,365.00
D 28,554.75
218,919.75
21,891.98

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 3,750.00
160,000.00 4,000.00
190,000.00 4,750.00
190,000.00 190.00
JUMLAH TENAGA KERJA 12,690.00
15500 158,100.00
25500 1,275.00
JUMLAH HARGA BAHAN 159,375.00

-
JUMLAH HARGA ALAT -
172,065.00
D 25,809.75
197,874.75
19,787.48

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 99,000.00
160,000.00 52,800.00
190,000.00 6,270.00
190,000.00 6,270.00
JUMLAH TENAGA KERJA 164,340.00

2,083,000.00 83,320.00
23,000.00 9,200.00
3,000.00 600.00
3,355,000.00 50,325.00
220,000.00 77,000.00
10,100.00 60,600.00
JUMLAH HARGA BAHAN 281,045.00

-
JUMLAH HARGA ALAT -
445,385.00
D 66,807.75
512,192.75

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 99,000.00
160,000.00 52,800.00
190,000.00 6,270.00
190,000.00 6,270.00
JUMLAH TENAGA KERJA 164,340.00

2,083,000.00 83,320.00
23,000.00 9,200.00
3,000.00 600.00
3,355,000.00 50,325.00
2,558,000.00 33,254.00
10,100.00 60,600.00
JUMLAH HARGA BAHAN 237,299.00

-
JUMLAH HARGA ALAT -
401,639.00
D 60,245.85
461,884.85

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 105,000.00
160,000.00 56,000.00
190,000.00 6,650.00
190,000.00 6,650.00
JUMLAH TENAGA KERJA 174,300.00

23,000.00 127,777.78
1,725.00 20,268.75
135,000.00 4,725.00
JUMLAH HARGA BAHAN 152,771.53

JUMLAH HARGA ALAT


327,071.53
D 49,060.73
376,132.26
Harga Satuan Jumlah Harga
(Rp.) (Rp.)

150,000.00 105,000.00
160,000.00 56,000.00
190,000.00 6,650.00
190,000.00 6,650.00
JUMLAH TENAGA KERJA 174,300.00

21,500.00 238,888.89
1,725.00 20,268.75
JUMLAH HARGA BAHAN 259,157.64

JUMLAH HARGA ALAT


433,457.64
D 65,018.65
498,476.28

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 37,500.00 0.25


190,000.00 1,900.00
JUMLAH TENAGA KERJA 39,400.00

2,344,512.50 2,344,512.50
381,837.50 381,837.50
JUMLAH HARGA BAHAN 2,726,350.00

JUMLAH HARGA ALAT


2,765,750.00
D 414,862.50
3,180,612.50

Harga Satuan Jumlah Harga


(Rp.) (Rp.)

150,000.00 37,500.00
190,000.00 1,900.00
JUMLAH TENAGA KERJA 39,400.00

2,880,525.00 2,880,525.00
381,837.50 381,837.50
JUMLAH HARGA BAHAN 3,262,362.50

JUMLAH HARGA ALAT


3,301,762.50
D 495,264.38
3,797,026.88
HARGA UPAH

105,000.00 36,750.00 150,000.00


125,000.00 31,250.00 160,000.00
145,000.00 14,500.00 190,000.00
155,000.00 15,500.00 190,000.00

12,000.00 1,800.00 13,800.00

4,755,000.00 475,500.00 5,230,500.00


Overhead Biaya Angkut Total Harga
225.00 1,725.00
13.4 102.68
52.8 404.63
-
ANALISA HARGA SATUAN K3

K3 Perhitungan Biaya SMK 3 Konstruksi Bidang Pekerjaan Umum No 66/SE/M/2019

No Uraian Kode Satuan Koefisien

1 Sosialisasi dan Promosi K3 terdiri atas


Induksi K3 (Safety Induction) Orang 2.00
Spanduk Lembar 2.00
Poster Lembar 2.00

2 Alat Pelindung Diri terdiri atas


A. Topi Pelindung Buah 25.00
B. Sarung tangan Buah 15.00
C. Sepatu Keselamatan Rubber Safety shoes with Toe Cap Buah 25.00
D. Rompi Keselamatan Buah 25.00
3 Asuransi dan Perijinan terdiri atas
BPJS Ketenagakerjaan dan Kesehatan Kerja (Berdasarkan-
kepmenaker no Kep 196/Men/1999, untuk tenaga harian. Ls 1.00
6 Personil K3 terdiri atas
Petugas K3 OB 3.00
4 Fasilitas sarana Kesehatan terdiri atas
Peralatan P3K Ls 1.00
5 Rambu - Rambu terdiri atas
Rambu Petunjuk Buah 3.00
Rambu Peringatan Buah 3.00
Rambu Pekerjaan sementara Buah 2.00
6 Lain - lain terkait pengendalian resiko K3
Lampu Darurat Buah 1.00

Jumlah Harga Tena


D Jumlah

E Harga Satuan Pekerjaan (D+E)


Jumlah
Harga Satuan
Harga
(Rp) (Rp)

100,000.00 200,000.00
100,000.00 200,000.00
100,000.00 200,000.00

155,000.00 3,875,000.00
35,000.00 525,000.00
300,000.00 7,500,000.00
75,000.00 1,875,000.00

11,000,000.00 11,000,000.00

3,000,000.00 9,000,000.00

1,200,000.00 1,200,000.00

200,000.00 600,000.00
200,000.00 600,000.00
100,000.00 200,000.00

300,000.00 300,000.00

Jumlah Harga Tenaga Kerja 37,275,000.00


37,275,000.00

37,275,000.00
DAFTAR ANALISA PEKERJAAN
KOTA SINGKAWANG 2019
(P.Ps) HARGA SATUAN PEKERJAAN PERSIAPAN

(P.Ps.02) Pengukuran dan pemasangan 1 m' Bouwplank


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.10 136,300.00 13,630.00
Tukang Kayu L.02 OH 0.10 136,300.00 13,630.00
Kepala Tukang L.03 OH 0.01 157,300.00 1,573.00
Mandor L.04 OH 0.005 167,300.00 836.50
JUMLAH TENAGA KERJA 29,669.50
B BAHAN
Kayu balok 5/7 m³ 0.12 2,364,835.20 283780.224
Paku 2"-3" Kg 0.02 23,520.00 470.4
Kayu papan 3/20 m³ 0.007 677,353.60 4741.4752
JUMLAH HARGA BAHAN 288992.0992
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 318,661.60


E Overhead & Profit (Contoh 15 % ) 15 % x D 47,799.24
F Harga Satuan Pekerjaan (D+E) 366,460.84

(P.Ps.03) Pembersihan 1 m2 Lapangan dan Perataan


Harga Satuan Jumlah Harga
No. Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.10 136,300.00 13,630.00
Mandor L.04 OH 0.050 167,300.00 8,365.00
JUMLAH TENAGA KERJA 21,995.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 21,995.00


E Overhead & Profit (Contoh 15 % ) 15 % x D 3,299.25
F Harga Satuan Pekerjaan (D+E) 25,294.25

(P.Ps.04) Pembuatan 1 m² bedeng pekerja


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.00 136,300.00 136,300.00
Tukang Kayu L.02 OH 2.00 136,300.00 272,600.00
Kepala Tukang L.03 OH 0.20 157,300.00 31,460.00
Mandor L.04 OH 0.05 167,300.00 8,365.00
JUMLAH TENAGA KERJA 448,725.00
B BAHAN
Dolken kayu
Batang 1.25 23,184.00 28,980.00
8-10/400 cm
Kayu m³ 0.186 2,364,835.20 439,859.35
Paku biasa Kg 0.300 23,520.00 7,056.00
Semen Portland Kg 18.00 1,826.00 32,868.00
Pasir beton m³ 0.03 110,286.00 3,308.58
Koral beton m³ 0.05 302,462.00 15,123.10
Seng Gelombang Lbr 1.50 55,272.00 82,908.00
Plywood 4 mm Lbr 1.350 88,200.00 119,070.00
JUMLAH HARGA BAHAN 729,173.03
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,177,898.03


E Overhead & Profit (Contoh 15 % ) 15 % x D 176,684.70
F Harga Satuan Pekerjaan (D+E) 1,354,582.73
(P.T) HARGA SATUAN PEKERJAAN TANAH

(P.T.06) Penggalian 1 m³ tanah biasa sedalam 1 m


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.850 136,300.00 115,855.00
Mandor L.04 OH 0.035 167,300.00 5,855.50
JUMLAH TENAGA KERJA 121,710.50
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 121,710.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 18,256.58
F Harga Satuan Pekerjaan (D+E) 139,967.08
(P.T.09) Pengurugan kembali 1 m³ galian tanah
Pengurugan kembali 1 m³ galian dihitung dari 1/3 kali dari koefisien pekerjaan galian
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.500 136,300.00 68,150.00
Mandor L.04 OH 0.050 167,300.00 8,365.00
JUMLAH TENAGA KERJA 76,515.00
B BAHAN

JUMLAH HARGA BAHAN


C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 76,515.00


E Overhead & Profit (Contoh 15 % ) 15 % x D 11,477.25
F Harga Satuan Pekerjaan (D+E) 87,992.25

(P.T.10) Penggalian tanah 1 m³ sedalam 2 m dengan alat berat

Harga Satuan Jumlah Harga


No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.090 136,300.00 12,267.00
Mandor L.04 OH 0.060 167,300.00 10,038.00
Operator Alat Berat L.05 0.650 167,300.00 108,745.00
JUMLAH TENAGA KERJA 131,050.00

B BAHAN
Solar liter 7.350 5,040.00 37,044.00
JUMLAH HARGA BAHAN 37,044.00
C PERALATAN
Excavator E.02 Jam 0.350 97,000.00 33,950.000
JUMLAH HARGA ALAT 33,950.000

D Jumlah (A+B+C) 202,044.00


E Overhead & Profit (Contoh 15 % ) 15 % x D 30,306.60
F Harga Satuan Pekerjaan (D+E) 232,350.60

(P.T.13) Pengurugan 1 m³ dengan pasir urug


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.300 136,300.00 40,890.00
Mandor L.04 OH 0.025 167,300.00 4,182.50
JUMLAH TENAGA KERJA 45,072.50
B BAHAN
Pasir urug m³ 1.200 110,286.00 132343.2
JUMLAH HARGA BAHAN 132343.2
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C) 177,415.70
E Overhead & Profit (Contoh 15 % ) 15 % x D 26,612.36
F Harga Satuan Pekerjaan (D+E) 204,028.06
(P.BB) HARGA SATUAN PEKERJAAN BETON

(P.BB.01) Membuat 1 m³ beton mutu f' c = 7,4 Mpa (K 100), slump ( 12..2)cm, w/c = 0,87
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.313 136,300.00 178,961.90
Tukang Batu L.02 OH 0.189 136,300.00 25,760.70
Kepala Tukang L.03 OH 0.020 157,300.00 3,146.00
Mandor L.04 OH 0.132 167,300.00 22,083.60
JUMLAH TENAGA KERJA 229,952.20
B BAHAN
Semen Portland Kg 245.000 1,826 447,370.00
Pasir Beton Kg 660.000 79 51,991.97
Kerikil ( Maks 30mm) Kg 899.000 224.05 201,417.29
Air Kg 215.000 0.00 -
JUMLAH HARGA BAHAN 700,779.26
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 930,731.46


E Overhead & Profit (Contoh 15 % ) 15 % x D 139,609.72
F Harga Satuan Pekerjaan (D+E) 1,070,341.18
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%

(P.BB. 02) Membuat 1 m3 beton mutu f’ = 14,5 MPa (K 175), Site Mix
slump ( 12 . . 2 ) cm, w/c = 0,66
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.323 136,300.00 180,324.90
Tukang Batu L.02 OH 0.189 136,300.00 25,760.70
Kepala Tukang L.03 OH 0.019 157,300.00 2,988.70
Mandor L.04 OH 0.132 167,300.00 22,083.60
JUMLAH TENAGA KERJA 231,157.90
B BAHAN
Semen Portland Kg 326.000 1,826 595,276.00
Pasir Beton Kg 760 79 59,869.54
Kerikil ( Maks 30mm) Kg 1029 221.73 228,159.03
Air Liter 215 0.00 -
JUMLAH HARGA BAHAN 883,304.57
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,114,462.47


E Overhead & Profit (Contoh 15 % ) 15 % x D 167,169.37
F Harga Satuan Pekerjaan (D+E) 1,281,631.84

(P.BB.03) Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225),


slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.323 136,300.00 180,324.90
Tukang Batu L.02 OH 0.189 136,300.00 25,760.70
Kepala Tukang L.03 OH 0.019 157,300.00 2,988.70
Mandor L.04 OH 0.132 167,300.00 22,083.60
JUMLAH TENAGA KERJA 231,157.90
B BAHAN
Semen Portland Kg 371.000 1,826 677,446.00
Pasir Beton Kg 698 79 54,985.45
Kerikil ( Maks 30mm) Kg 1047 221.73 232,150.15
Air Liter 215 0.00 -
JUMLAH HARGA BAHAN 964,581.60
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,195,739.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 179,360.92
F Harga Satuan Pekerjaan (D+E) 1,375,100.42
(P.BB.04) Membuat Beton Mutu f'c = 21,7 Mpa (K 250), Slump (12..2) cm, w/c = 0,56
slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.323 136,300.00 180,324.90
Tukang Batu L.02 OH 0.189 136,300.00 25,760.70
Kepala Tukang L.03 OH 0.019 157,300.00 2,988.70
Mandor L.04 OH 0.132 167,300.00 22,083.60
JUMLAH TENAGA KERJA 231,157.90
B BAHAN
Semen Portland Kg 384.000 1,826 701,184.00
Pasir Beton Kg 692 79 54,512.79
Kerikil ( Maks 30mm) Kg 1039 221.73 230,376.32
Air Liter 215 0.00 -
JUMLAH HARGA BAHAN 986,073.11
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,217,231.01


E Overhead & Profit (Contoh 15 % ) 15 % x D 182,584.65
F Harga Satuan Pekerjaan (D+E) 1,399,815.66

(P.BB.05) Membuat Beton Mutu f'c = 26,4 Mpa (K 300), Slump (12..2) cm, w/c = 0,52
slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.650 136,300.00 224,895.00
Tukang Batu L.02 OH 0.275 136,300.00 37,482.50
Kepala Tukang L.03 OH 0.028 157,300.00 4,404.40
Mandor L.04 OH 0.165 167,300.00 27,604.50
JUMLAH TENAGA KERJA 294,386.40
B BAHAN
Semen Portland Kg 413.000 1,826 754,138.00
Pasir Beton Kg 681 79 53,646.26
Kerikil ( Maks 30mm) Kg 1021 221.73 226,385.20
Air Liter 215 0.00 -
JUMLAH HARGA BAHAN 1,034,169.46
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,328,555.86


E Overhead & Profit (Contoh 15 % ) 15 % x D 199,283.38
F Harga Satuan Pekerjaan (D+E) 1,527,839.24

(P.BB.05.a) Membeli dan Mengerjakan 1 m3 Beton Ready Mix K 175


slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.000 136,300.00 136,300.00
Tukang Batu L.02 OH 0.250 136,300.00 34,075.00
Kepala Tukang L.03 OH 0.025 157,300.00 3,932.50
Mandor L.04 OH 0.100 167,300.00 16,730.00
JUMLAH TENAGA KERJA 191,037.50
B BAHAN
Beton Ready Mix 300 Kg 1.250 1,275,300 1,594,125.00
JUMLAH HARGA BAHAN 1,594,125.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 1,785,162.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 267,774.38
F Harga Satuan Pekerjaan (D+E) 2,052,936.88

(P.BB.05.b) Membeli dan Mengerjakan 1 m3 Beton Ready Mix K 225


slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.000 136,300.00 136,300.00
Tukang Batu L.02 OH 0.250 136,300.00 34,075.00
Kepala Tukang L.03 OH 0.025 157,300.00 3,932.50
Mandor L.04 OH 0.100 167,300.00 16,730.00
JUMLAH TENAGA KERJA 191,037.50
B BAHAN
Beton Ready Mix 300 Kg 1.250 1,487,500 1,859,375.00
JUMLAH HARGA BAHAN 1,859,375.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,050,412.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 307,561.88
F Harga Satuan Pekerjaan (D+E) 2,357,974.38
(P.BB.05.c) Membeli dan Mengerjakan 1 m3 Beton Ready Mix K 300
slump (12 ± 2) cm, w/c = 0,58
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 1.000 136,300.00 136,300.00
Tukang Batu L.02 OH 0.250 136,300.00 34,075.00
Kepala Tukang L.03 OH 0.025 157,300.00 3,932.50
Mandor L.04 OH 0.100 167,300.00 16,730.00
JUMLAH TENAGA KERJA 191,037.50
B BAHAN
Beton Ready Mix 300 Kg 1.250 1,655,700 2,069,625.00
JUMLAH HARGA BAHAN 2,069,625.00
C PERALATAN
JUMLAH HARGA ALAT

D Jumlah (A+B+C) 2,260,662.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 339,099.38
F Harga Satuan Pekerjaan (D+E) 2,599,761.88

(P.BB.23.c) Pemasangan Beton U Ditch M3 K350

Harga Satuan Jumlah Harga


No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.350 136,300.00 47,705.00
Tukang Batu L.02 OH 0.050 136,300.00 6,815.00
Kepala Tukang L.03 OH 0.028 157,300.00 4,404.40
Mandor L.04 OH 0.033 167,300.00 5,520.90
JUMLAH TENAGA KERJA 64,445.30
B BAHAN
Beton U ditch Uk 50 x 60 x 120 m3 0.554 720,000 398,880.00
JUMLAH HARGA BAHAN 398,880.00
C PERALATAN
L.04 OH 0.534 155,000.00 82,770.00
Crane 10-15 Ton JUMLAH HARGA ALAT

D Jumlah (A+B+C) 546,095.30


E Overhead & Profit (Contoh 15 % ) 15 % x D 81,914.30
F Harga Satuan Pekerjaan (D+E) 628,009.60
(P.BB.07) Pembesian 10 kg dengan besi polos atau besi ulir
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.700 136,300.00 95,410.00
Tukang Kayu L.02 OH 0.700 136,300.00 95,410.00
Kepala Tukang L.03 OH 0.070 157,300.00 11,011.00
Mandor L.04 OH 0.070 167,300.00 11,711.00
JUMLAH TENAGA KERJA 213,542.00
B BAHAN
Besi beton
kg 1.500 21,952 32,928.00
( polos/ulir )
Kawat beton kg 0.020 35,280 705.600
JUMLAH HARGA BAHAN 33,633.60
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 247,175.60


E Overhead & Profit (Contoh 15 % ) 15 % x D 37,076.34
F Harga Satuan Pekerjaan (D+E) 284,251.94

(P.BB.07.a) Pembesian 1 kg dengan besi polos atau besi ulir


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.700 136,300.00 95,410.00
Tukang Kayu L.02 OH 0.700 136,300.00 95,410.00
Kepala Tukang L.03 OH 0.070 136,300.00 9,541.00
Mandor L.04 OH 0.070 136,300.00 9,541.00
JUMLAH TENAGA KERJA 209,902.00
B BAHAN
Besi beton
kg 1.500 21,952 32,928.00
( polos/ulir )
Kawat beton kg 0.200 35,280 7,056.000
JUMLAH HARGA BAHAN 39,984.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 249,886.00


E Overhead & Profit (Contoh 15 % ) 15 % x D 37,482.90
F Harga Satuan Pekerjaan (D+E) 28,425.19

(P.BB.08) Pemasangan 10 kg jaring kawat baja ( wiremesh )


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.025 136,300.00 3,407.50
Tukang Kayu L.02 OH 0.025 136,300.00 3,407.50
Kepala Tukang L.03 OH 0.003 157,300.00 393.25
Mandor L.04 OH 0.003 167,300.00 418.25
JUMLAH TENAGA KERJA 7,626.50
B BAHAN
1. Jaring kawat
kg 10.200 29,400.00 299,880.00
baja dilas
2. Kawat beton kg 0.050 35,280.00 1,764.00
JUMLAH HARGA BAHAN 301,644.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 309,270.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 46,390.58
F Harga Satuan Pekerjaan (D+E) 355,661.08
(P.BB.08.a) Pemasangan 1 kg jaring kawat baja ( wiremesh )
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.025 136,300.00 3,407.50
Tukang Kayu L.02 OH 0.025 136,300.00 3,407.50
Kepala Tukang L.03 OH 0.003 136,300.00 340.75
Mandor L.04 OH 0.003 136,300.00 340.75
JUMLAH TENAGA KERJA 7,496.50
B BAHAN
1. Jaring kawat
kg 10.200 29,400.00 299,880.00
baja dilas
2. Kawat beton kg 0.050 35,280.00 1,764.00
JUMLAH HARGA BAHAN 301,644.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 309,140.50


E Overhead & Profit (Contoh 15 % ) 15 % x D 46,371.08
F Harga Satuan Pekerjaan (D+E) 35,551.16

(P.BB.09) Pemasangan 1 m² bekisting untuk pondasi


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.520 136,300.00 70,876.00
Tukang Kayu L.02 OH 0.260 136,300.00 35,438.00
Kepala Tukang L.03 OH 0.026 157,300.00 4,089.80
Mandor L.04 OH 0.026 167,300.00 4,349.80
JUMLAH TENAGA KERJA 114,753.60
B BAHAN
Kayu kelas III m³ 0.060 2,364,835.20 141,890.11
Paku 5 - 10 cm kg 0.300 23,520.00 7,056.00
Minyak bekisting Liter 0.100 43,859.20 4,385.92
JUMLAH HARGA BAHAN 153,332.03
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 268,085.63


E Overhead & Profit (Contoh 15 % ) 15 % x D 40,212.84
F Harga Satuan Pekerjaan (D+E) 308,298.48

(P.BB.11.a) Pemasangan 1 m² bekisting untuk sloof


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.430 136,300.00 58,609.00
Tukang Kayu L.02 OH 0.150 136,300.00 20,445.00
Kepala Tukang L.03 OH 0.015 157,300.00 2,359.50
Mandor L.04 OH 0.030 167,300.00 5,019.00
JUMLAH TENAGA KERJA 86,432.50
B BAHAN
Kayu kelas III m³ 0.016 2,364,835.20 37,837.36
Paku 5 - 10 cm kg 0.300 23,520.00 7,056.00
Papan Kls III m³ 0.022 987,840.00 21,732.48
Dolken kayu 8-10 cm btg 2.000 23,184.00 46,368.00
Minyak bekisting Liter 0.200 43,859.20 8,771.84
JUMLAH HARGA BAHAN 121,765.68
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 208,198.18


E Overhead & Profit (Contoh 15 % ) 15 % x D 31,229.73
F Harga Satuan Pekerjaan (D+E) 239,427.91

(P.BB.12) Pemasangan 1 m² bekisting untuk kolom


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.340 136,300.00 46,342.00
Tukang Kayu L.02 OH 0.170 136,300.00 23,171.00
Kepala Tukang L.03 OH 0.017 157,300.00 2,674.10
Mandor L.04 OH 0.034 167,300.00 5,688.20
JUMLAH TENAGA KERJA 77,875.30
B BAHAN
Kayu kelas III m³ 0.011 2,364,835.20 26,013.19
Paku 5 cm - 12 cm Kg 0.300 23,520.00 7,056.00
Minyak bekisting Liter 0.200 43,859.20 8,771.84
Balok kayu kelas II m³ 0.010 2,109,800.00 21,098.00
Plywood tebal 9 mm Lbr 0.220 184,800.00 40,656.00
Dolken kayu 8-10 cm
Batang 1.000 23,184.00 23,184.00
panjang 4 m
JUMLAH HARGA BAHAN 126,779.03
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 204,654.33


E Overhead & Profit (Contoh 15 % ) 15 % x D 30,698.15
F Harga Satuan Pekerjaan (D+E) 235,352.48
A TENAGA
Pekerja L.01 OH 0.100 136,300.00 13,630.00
Tukang Kayu L.02 OH 0.100 136,300.00 13,630.00
Kepala Tukang L.03 OH 0.010 157,300.00 1,573.00
Mandor L.04 OH 0.005 167,300.00 836.50
JUMLAH TENAGA KERJA 29,669.50
B BAHAN
GRC Board (120 x 240 x 4) Lembar 0.375 94,080.00 35,280.00
Paku tripleks Kg 0.030 32,334.40 970.03
JUMLAH HARGA BAHAN 36,250.03
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 65,919.53


E Overhead & Profit (Contoh 15 % ) 15 % x D 9,887.93
F Harga Satuan Pekerjaan (D+E) 75,807.46

(P.Pf.07) Pemasangan 1 m² langit-langit gypsum board ukuran (120x240x9) mm,tebal 9 mm


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.100 136,300.00 13,630.00
Tukang Kayu L.02 OH 0.050 136,300.00 6,815.00
Kepala Tukang L.03 OH 0.005 157,300.00 786.50
Mandor L.04 OH 0.005 167,300.00 836.50
JUMLAH TENAGA KERJA 22,068.00
B BAHAN
Gypsum board Lembar 0.364 75,152.00 27,355.33
Paku skrup Kg 0.110 32,334.40 3,556.78
JUMLAH HARGA BAHAN 30,912.11
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 52,980.11


E Overhead & Profit (Contoh 15 % ) 15 % x D 7,947.02
F Harga Satuan Pekerjaan (D+E) 60,927.13

(P.PA) HARGA SATUAN PEKERJAAN PENUTUP ATAP

A.4.5.2.1. Pemasangan 1 m² atap genteng palentong kecil


Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.15 136,300 20,445.00
Tukang Kayu L.03 OH 0.075 136,300 10,222.50
Kepala Tukang L.11 OH 0.0075 157,300 1,179.75
Mandor L.15 OH 0.008 167,300 1,338.40
JUMLAH TENAGA KERJA 33,185.65
B BAHAN
Genteng palentong Bh 25.00 1,800 45,000.00
JUMLAH HARGA BAHAN 45,000.00
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 78,185.650


E Overhead & Profit (Contoh 15 % ) 15 % x D 11,727.848
F Harga Satuan Pekerjaan (D+E) 89,913.498

(P.PA.07) Pembuatan dan pemasangan 1 m³ kusen pintu dan kusen jendela,kayu kelas 1
Harga Satuan Jumlah Harga
No.
Uraian Kode Satuan Koefisien (Rp) (Rp)

A TENAGA
Pekerja L.01 OH 0.25 136,300.00 34,075.00
Tukang Kayu L.03 OH 0.25 136,300.00 34,075.00
Kepala Tukang L.11 OH 0.025 157,300.00 3,932.50
JUMLAH TENAGA KERJA 72,082.50
B BAHAN
Paku Lbr 0.100 23,520.00 2,352.000
Seng Datar Color 0,35 6.000 80,080.00 480,480.000
Papan Kayu Kelas II (tdk ketam) Kg 0.072 2,440,200.00 175,694.400
JUMLAH HARGA BAHAN 658,526.400
C PERALATAN

JUMLAH HARGA ALAT

D Jumlah (A+B+C) 730,608.900


E Overhead & Profit (Contoh 15 % ) 15 % x D 109,591.335
F Harga Satuan Pekerjaan (D+E) (1m2) 84,020.024

(P.K) HARGA SATUAN PEKERJAAN KAYU


RENCANA ANGGARAN BIAYA
ENGGINERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

A PEKERJAAN PERSIAPAN
1 Pembersihan/persiapan lahan 18.00 lsm - 3,800,000.00 68,400,000.00
2 Sewa Direksi Keet 16.00 m2 P.Ps. 04 1,354,582.73 21,673,323.70
3 Mobilisasi dan Demolisasi 1.00 lsm - 10,000,000.00 10,000,000.00
4 Manajemen K3 1 Lsm - 12,000,000.00 12,000,000.00
Sub Jumlah 100,073,323.70
JUMLAH 100,073,323.70
Pajak Pertambahan Nilai ( PPN 15 %)
Total Biaya Termasuk PPn 100,073,323.70

DIBULATKAN : SERATUS TUJUH PULUH TIGA RIBU TIGA RATUS RUPIAH 100,073,300.00

PPK PENATAAN BANGUNAN Pontianak, 11 Juni 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

A PEKERJAAN JL. DIPONEGORO 1


I PEKERJAAN POT BUNGA KOTAK
1 Pekerjaan Pot Bunga Beton Bertulang K175
Ukuran Pot 100 cm x 50 cm sebanyak 295 unit
- Beton K175 80.04 m3 P.BB. 02 1,281,631.84 102,584,068.14
- Tulangan Ø8 5,852.80 kg P.BB. 07.a 28,425.19 166,366,975.44
- Bekesting 384.35 m2 P.BB. 11.a 221,648.21 85,190,400.36
2 Media Tanam 44.93 m3 509,600.00 22,894,360.94
3 Tanaman Ketapang Kencana t = 2m 885.00 Btg 336,000.00 297,360,000.00
4 Pasangan dinding bata merah ukuran 15 cm x 15 cm 81.90 m2 Err:509 Err:509 Err:509
Sub Jumlah Err:509
II PEKERJAAN SALURAN JALAN MASUK
1 Pembongkaran Saluran drainase jalan masuk ; p=158 m, l= 60, t=120 cm
- Pekerjaan Galian Tanah sedalam 200 cm 16.49 m3 P.T.06 232,350.60 3,831,763.45
- Cerucuk 785.30 Btg 17,388.00 13,654,796.40
- Pasir Alas 5.18 m3 P.T. 13 204,028.06 1,057,473.33
- Pekerjaan Urugan Kembali Tanah 7.54 m3 P.T.03 87,992.25 663,363.01
- Pemasangan Beton U ditch K350 uk 50 cm x 60 cm x 120 cm 344.00 Bh P.BB. 23 c 628,009.60 216,035,300.68
Bekisting 47.12 m2 P.BB. 11.a 239,427.91 11,281,364.30
2 Plat Tutup Beton dengan Panjang Saluran 157 m sebanyak 314 Buah
- Beton K-225 18.85 m3 P.BB. 05 1,375,100.42 25,916,792.63
- Tulangan Ø8 496.36 Kg P.BB. 23 c 28,425.19 14,109,192.69
- Bekisting 208.58 m2 P.BB. 13 242,439.13 50,566,906.69
Sub Jumlah 337,116,953.18
III PEKERJAAN SALURAN DAN TROTOAR
1 Pekerjaan Pembongkaran Saluran Lama P =598 m
- Pekerjaan Galian Tanah sedalam 200 cm 62.76 m3 P.T.06 232,350.60 14,582,707.03
- Cerucuk 1,793.19 Btg 15,456.00 27,715,544.64
- Pasir Alas 19.73 m3 P.T. 13 204,028.06 4,024,471.75
2 Saluran drainase trotoar pemasangan U-Dith P = 598 m
- Pemasangan Beton U ditch K350 776.00 bh P.BB. 23 c 628,009.60 487,335,445.72
- Bekisting 143.46 m2 P.BB. 11.a 239,427.91 34,347,178.81
- Pekerjaan Urugan Kembali Tanah 28.69 m3 P.T.03 87,992.25 2,524,589.16
3 Plat Tutup Beton dengan Panjang Saluran 472 m sebanyak 944 Buah
- Beton K-225 25.30 m3 P.BB. 02 1,375,100.42 34,788,940.53
- Tulangan 1,491.68 kg P.BB. 23 c 28,425.19 42,401,241.25
- Bekisting 626.82 m2 P.BB. 11.a 242,439.13 151,964,726.59
4 Pekerjaan Trotoar dengan panjang 598 meter
- Pasir Alas,t= 15 cm 134.49 m3 P.T. 13 204,028.06 27,439,580.10
- Batu Alam Andesit bintik Bakar 30 x 60 cm 896.60 m2 P.Ld.34.b 353,349.93 316,811,781.83
- Pekerjaan Jalur difabel ( Guiding block) uk 30 cm x 30 cm 157.06 m' P.Ld.34.d 339,377.89 53,302,690.84
- Balok Kansteen Beton K-225 23.91 m3 P.BB. 03 1,375,100.42 32,877,550.95
- Bekisting 113.82 m2 P.BB. 11.a 242,439.13 27,595,391.69
- Wiremesh M5 1,908.62 kg P.BB. 08 35,566.11 67,882,348.75
5 Pipa PVC 3" untuk saluran air jalan raya 246.56 m' 40,719.91 10,040,049.00
Sub Jumlah 1,335,634,238.65
IV PEKERJAAN LAMPU PENERANGAN
1 Lampu Type 1 dengan jumlah lampu 52 buah
- Cor Beton K 175 0.48 m3 P.BB. 02 1,281,631.84 612,299.61
- Rumah Lampu Custom 52.00 Buah Err:509 Err:509
- Instalasi Titik Lampu 26.00 titik Err:509 Err:509
- Lampu LED Warm 7 Watt 52.00 Buah Err:509 Err:509
- Tiang Lampu 26.00 Unit 8,400,000.00 218,400,000.00
- Box Panel 13.00 Set Err:509 Err:509
2 Lampu Type 2 dengan jumlah lampu 15 buah
- Cor Beton K 175 0.48 m3 P.BB. 02 1,281,631.84 612,299.61
- Rumah Lampu Custom 15.00 Buah Err:509 Err:509
- Instalasi Titik Lampu 5.00 titik Err:509 Err:509
- Lampu LED Warm 7 Watt 15.00 Buah Err:509 Err:509
- Tiang Lampu 5.00 Unit 8,400,000.00 42,000,000.00
- Box Panel 5.00 Set Err:509 Err:509
Sub Jumlah Err:509
V PEKERJAAN BAK SAMPAH
Bak Sampah Bentuk Vas pabrikasi Besi dan Seng Plat dengan Vas Guci (2
1
fungsi) dengan jumlah 5 Buah
- Vas pot 5.00 Bh 96,000.00 480,000.00
- Tulangan Ø6 9.01 Kg 17,344.00 156,252.10
- Seng Polos t= 2 mm 4.41 m2 35,000.00 154,192.50
- Pengelasan 3.30 m2 23,000.00 75,994.88
2 Rangka Besi Hollow 4 x 4 cm 8.99 m2 Err:509 Err:509
3 Anyaman Bambu 5.00 - Err:509 Err:509
Sub Jumlah Err:509
VI PEKERJAAN BANGKU TAMAN
1 - Beton K-225 1.28 m3 P.BB. 02 1,375,100.42 1,760,128.54
- Tulangan dia 4 mm 108.98 kg P.BB. 23 c 28,425.19 3,097,694.42
- Tulangan dia 8 mm 81.73 kg P.BB. 23 c 28,425.19 2,323,270.82
- Wiremesh M5 1.36 kg P.BB. 08.a 35,566.11 48,455.21
Sub Jumlah 7,229,548.99

JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN Err:509

DUA MILYAR TUJUH RATUS LIMA DUA PULUH DELAPAN JUTA DUA RATUS TUJUH PULUH TUJUH RIBU ENAM RATUS
DIBULATKAN :
RUPIAH Err:509

PPK PENATAAN BANGUNAN Pontianak, 23 Maret 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
REKAPITULASI RENCANA ANGGRAN BIAYA (RAB)
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

SUB TOTAL BIAYA


NO URAIAN PEKERJAAN VOLUME TOTAL BIAYA (Rp)
(Rp)
1 2 3

A PEKERJAAN JL. DIPONEGORO 1


I PEKERJAAN POT BUNGA KOTAK
Pekerjaan Pot Bunga Beton Bertulang K175
1 6317.19 354,141,443.95
Ukuran Pot 100 cm x 50 cm sebanyak 295 unit
2 Media tanam untuk pot sebanyak 295 unit 44.93 22,894,360.94
3 Tanaman Ketapang Kencana t = 2m sebanyak 885 Batang 885 297,360,000.00
4 Pasangan dinding pot batu palimanan uk 15 cm x 15 cm 81.9 Err:509
Sub Jumlah Err:509

II PEKERJAAN SALURAN JALAN MASUK


1 Pembongkaran Saluran drainase jalan masuk ; p=158 m, l= 60, t=120 cm 1,409,196.41 246,524,061.17
2 Plat Tutup Beton dengan Panjang Saluran 157 m sebanyak 314 Buah 723.79 90,592,892.01
Sub Jumlah 337,116,953.18

III PEKERJAAN SALURAN DAN TROTOAR


1 Pekerjaan Pembongkaran Saluran Lama P =598 m #NAME? 46,322,723.42
2 Saluran drainase trotoar pemasangan U-Dith P = 598 m 524,207,213.70
3 Plat Tutup Beton 229,154,908.37
4 Pekerjaan Trotoar dengan panjang 598 meter 525,909,344.16
5 Pipa PVC 3" untuk saluran air jalan raya 10,040,049.00
Sub Jumlah 1,335,634,238.65
IV PEKERJAAN LAMPU PENERANGAN
1 Lampu Type 1 dengan jumlah lampu 52 buah Err:509
2 Lampu Type 2 dengan jumlah lampu 15 buah Err:509
Sub Jumlah Err:509
V PEKERJAAN BAK SAMPAH
Bak Sampah Bentuk Vas pabrikasi Besi dan Seng Plat dengan Vas Guci
1 866,439.47
(2 fungsi) dengan jumlah 5 Buah
2 Rangka Besi Hollow 4 x 4 cm Err:509
3 Anyaman Bambu Err:509
Sub Jumlah Err:509

VI PEKERJAAN BANGKU TAMAN 7,229,548.99


Sub Jumlah 7,229,548.99

JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk Ppn Err:509
DUA MILYAR TUJUH RATUS LIMA PULUH DELAPAN JUTA SEMBILAN RATUS
DIBULATKAN :
DUA PULUH TIGA RIBU SEMBILAN RATUS RUPIAH
Err:509

PPK PENATAAN BANGUNAN Pontianak, 23 Maret 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT
PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T


NIP. 19761001 200812 1 001 YUDHA SANJAYA, ST
Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
REKAPITULASI RENCANA ANGGRAN BIAYA (RAB)
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

SUB TOTAL BIAYA


NO URAIAN PEKERJAAN TOTAL BIAYA (Rp)
(Rp)
1 2 3

Err:509 Err:509
I Err:509
Pekerjaan Pot Bunga Beton Bertulang K175 Ukuran Pot 100 cm x 50 cm
1 Err:508
sebanyak 152 unit
2 Err:509 Err:509
3 Err:509 Err:509
4 Err:509 Err:509
5 Err:509 Err:509
6 Err:509 Err:509
Sub Jumlah Err:509

Err:509 Err:509
1 Err:509 Err:509
2 Err:509 Err:509
3 Err:509 Err:509
4 Err:509 Err:509
Sub Jumlah Err:509

3 PEKERJAAN PERBAIKAN JALAN KORIDOR PEMUDA MERDEKA


A Pekerjaan Perbaikan Koridor STA 0+00 s.d STA 0+025
1 Beton Ready Mixed K-225 Tebal 10 cm 21,871,450.07
2 Pemasangan dan Pengadaan Batu Alam Andesit bintik Bakar 30 x 60 cm 46,414,280.25
3 Pemasangan Jalur Difabel ( Guiding Block ) -
4 Err:509 Err:509
5 Err:509 Err:509
6 Err:509 Err:509
7 Err:509 Err:509
8 Err:509 Err:509
Sub Jumlah Err:509
Err:509 Err:509
Err:509 Err:508
Err:509 Err:508
Err:509 Err:508
Err:509 Err:508
Err:509 Err:509

Sub Jumlah Err:508


V Err:509
Bak Sampah Bentuk Vas pabrikasi Besi dan Seng Plat dengan Vas Guci
1 Err:508
(2 fungsi) dengan jumlah 150 Buah
2 Err:509 Err:508
3 Err:509 Err:509
Sub Jumlah Err:508
Err:509 Err:509
1 Err:509 Err:508
2 Err:509 Err:509
3 Err:509 Err:509
Sub Jumlah Err:508
6 PEKERJAAN PENGECATAN
1 0 60,269,187.67
2 Err:509 Err:509
3 Err:509 Err:509
Sub Jumlah Err:509
Err:509 Err:509
1 Err:509 Err:509
Sub Jumlah Err:509

JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk Ppn Err:509
Tiga Milyar Empat Ratus Tujuh Belas Juta Sembilan Ratus Empat
DIBULATKAN :
Puluh Tiga Ribu Enam Ratus Rupiah Err:509

PPK PENATAAN BANGUNAN Pontianak, 16 Juni 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT
PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T


NIP. 19761001 200812 1 001 YUDHA SANJAYA, ST
Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

D PEKERJAAN JL. SETIA BUDI


I PEKERJAAN POT BUNGA NON WASTAFEL
Pekerjaan Pot Bunga Beton Bertulang K175 Ukuran Pot 100
1
cm x 50 cm sebanyak 28 unit
- Beton K-225 7.90 m3 P.BB. 02 1,375,100.42 10,857,792.91
- Tulangan 628.21 kg Err:509 28,425.19 17,856,934.27
- Bekesting 66.95 m2 P.BB. 25.c 221,648.21 14,838,904.28
2 Tutup Penampung Air Bersih 56.00 bh 240,800.00 13,484,800.00
3 Media Tanam 4.03 m3 509,600.00 2,054,707.20
4 Pagar Besi Tempa Dia. 20mm 52.92 m' 430,080.00 22,759,833.60
5 Tanaman Pucuk Merah t = 1m 28.00 Btg 255,000.00 7,140,000.00
6 Batu Alam Andesit bintik Bakar 30 x 60 cm 54.60 m2 P.Ld.40.a 404,106.33 22,064,205.70
Sub Jumlah 111,057,177.96

II PEKERJAAN POT BUNGA WASTAFEL


1 Pot Beton Bertulang Jumlah 39 Buah
- Beton K-225 13.26 m3 P.BB. 02 1,375,100.42 18,239,194.45
- Tulangan 985.77 kg Err:509 28,425.19 28,020,588.37
- Bekesting 83.15 m2 P.BB. 25.c 221,648.21 18,429,397.80
2 Tutup Penampung Air Bersih 78.00 bh 240,800.00 18,782,400.00
3 Media Tanam 3.28 m3 509,600.00 1,669,449.60
4 Pagar Besi Tempa Dia. 20mm 73.71 m' 430,080.00 31,701,196.80
5 Tanaman Pucuk Merah t = 1 m 39.00 Btg 255,000.00 9,945,000.00
6 Batu Alam Andesit bintik Bakar 30 x 60 cm 73.13 m2 Err:509 404,106.33 29,550,275.49
Sub Jumlah 156,337,502.51

III PEKERJAAN ELEKTRIKAL LAMPU KOLOM KORIDOR


1 Rumah Lampu Custom Model Lampion 73.00 Buah 532,000.00 38,836,000.00
2 Plat Siku Ornamen Lampu 73.00 Buah 150,000.00 10,950,000.00
3 Instalasi perlengkapan jaringan Listrik Lampu 73.00 Buah 179,200.00 13,081,600.00
4 Lampu LED Warm 7 Watt 73.00 bh 39,200.00 2,861,600.00
5 Box Panel 7.00 set 2,800,000.00 19,600,000.00
Sub Jumlah 85,329,200.00

IV PEKERJAAN PENATAAN KORIDOR


Bongkaran Beton sebanyak 7 Block Kawasan Ruko P=440
1 9.63 m3 P.Bkr. 01 166,364.75 1,601,427.08
m

Pekerjaan Lantai Beton Akses Masuk Pemilik Ruko


2 2.90 m3 A.4.1.1.7 1,281,631.84 3,718,847.03
sebanyak 7 Block Kawasan Ruko P=440 m
3 Pemasangan Andesit Lantai Bintik bakar 60 x 30 876.87 m2 A.4.4.3.58 353,349.93 309,841,601.08
5 Pemasangan Jalur DiFable 98.53 m2 A.4.4.3.60 339,377.89 33,439,242.52
6 Pekerjaan Pembongkaran Plafond 975.40 m2 25,000.00 24,385,000.00
7 Pekerjaan Plafond Baru 975.40 m2 Err:509 60,927.13 59,428,321.43
7 Instalasi Titik Lampu di Plafond 124.00 titik 179,200.00 22,220,800.00
8 Fitting Lampu 124.00 titik 36,064.00 4,471,936.00
9 Armature Lampu LED Bulb 13 Watt 124.00 bh 39,200.00 4,860,800.00
Sub Jumlah 462,366,548.07

V PEKERJAAN SALURAN DAN TROTOAR


1 Pekerjaan Pembongkaran Saluran Lama P =440 m 322.40 m' 30,000.00 9,672,000.00
1 Cerucuk 1,612.00 bh 17,388.00 28,029,456.00
2 Pasir Alas 10.64 m3 Err:509 204,028.06 2,170,695.28
3 Saluran Air
- Beton K-225 42.81 m3 A.4.1.1.7 1,375,100.42 58,874,539.43
- Tulangan 2,916.14 kg Err:509 28,425.19 82,891,824.58
- Bekisting 278.55 m2 Err:509 239,427.91 66,693,506.46
4 Grill Besi D16 P= 442 m 212.78 m2 285,600.00 60,771,110.40
5 Pekerjaan pelebaran koridor P= 442 m
- Pasir Alas t = 9 cm 10.28 m3 Err:509 204,028.06 2,096,816.72
- Cor Beton t = 10 cm K-225 11.42 m3 A.4.1.1.7 1,375,100.42 15,702,271.69
- Batu Andesit 60 x 30 146.43 m2 Err:509 353,349.93 51,741,030.47
- Balok Kansteen Beton 6.13 m3 Err:509 1,281,631.84 7,850,764.00
- Bekisting 24.50 m2 Err:509 239,427.91 5,866,558.44
6 Err:509 496.00 Err:509 Err:509 Err:509 Err:509
Sub Jumlah Err:509

VI PEKERJAAN BAK SAMPAH


1 Bak Sampah Fiber Glass 126.00 unit 325,000.00 40,950,000.00
2 Rangka Besi Hollow 4 x 4 cm 35.63 m2 Err:509 Err:509
3 Anyaman Bambu 126.00 unit Err:509 Err:509
Sub Jumlah Err:509

VII PEKERJAAN PORTAL TROTOAR


1 Pondasi Portal jumlah 60 Buah
- Beton K 175 4.86 Err:509 Err:509 1,281,631.84 6,228,730.74
- Tulangan 450.14 Err:509 Err:509 Err:509 Err:509
- Bekesting 25.92 Err:509 Err:509 Err:509 Err:509
2 Pipa Galvanis Dia 4" jumlah 60 Titik Portal 56.25 Err:509 Err:509 Err:509
3 Sticker Scotlight Portal 47.09 Err:509 Err:509 Err:509
Sub Jumlah Err:509

VII PEKERJAAN PENGECATAN

1 Cat Kolom jumlah 124 Kolom 446.40 m2 P.Ct. 01 111,609.61 49,822,528.48


2 Cat dinding Fasad jumlah 124 Ruko 465.92 m2 P.Ct. 02 138,471.26 64,516,528.76
3 Cat Plafond Ruko, P=440 m x L= 3m 663.00 m2 P.Ct. 06 133,399.00 88,443,537.00
4 Cat Marka Jalan 1,124.44 m2 P.Ct. 08 35,355.00 39,754,733.33
Sub Jumlah 202,782,594.24
VIII PEKERJAAN SARAN DESAIN REKLAME
Reklame Ruko 279.00 m2 896,000.00 249,984,000.00
Sub Jumlah 249,984,000.00
X PEKERJAAN PLUMBING
1 Pemasangan paket plumbing Limbah Kotor 236 m' P.Plmb. 7 103,877.20 24,505,929.85
2 Pemasangan plumbing air bersih 239 m' P.Plmb. 7a 86,874.49 20,787,980.23

Sub Jumlah 45,293,910.08


JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN Err:509

SATU MILYAR DELAPAN RATUS ENAM PULUH ENAM JUTA TUJUH RATUS EMPAT PULUH DUA RIBU
DIBULATKAN : Err:509
RUPIAH

PPK PENATAAN BANGUNAN Pontianak, 16 Juni 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT
PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T


NIP. 19761001 200812 1 001 YUDHA SANJAYA, ST
Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

C PEKERJAAN JL. BUDI UTOMO


I PEKERJAAN POT BUNGA NON WASTAFEL
1 Pot Beton Bertulang
Beton K 225 11.84 m3 P.BB. 03 1,375,100.42 16,286,689.37
Tulangan 942.31 kg Err:509 28,425.19 26,785,401.41
Bekesting 100.42 m2 P.BB. 25.c 239,427.91 24,043,829.65
2 Tutup Penampung Air Bersih 84.00 bh 240,800.00 20,227,200.00
3 Media Tanam 6.05 m3 509,600.00 3,082,060.80
4 Pagar Besi Tempa Dia. 20mm 79.38 m' 430,080.00 34,139,750.40
5 Tanaman Pucuk Merah 42.00 Btg 336,000.00 14,112,000.00
6 Batu Andesit Susun Sirih 81.90 m2 Err:509 404,106.33 33,096,308.55
Sub Jumlah 171,773,240.17

II PEKERJAAN POT BUNGA WASTAFEL


1 Pot Beton Bertulang
Beton K 225 12.58 m3 P.BB. 03 1,375,100.42 17,303,851.15
Tulangan 935.21 kg Err:509 28,425.19 26,583,635.12
Bekesting 78.88 m2 P.BB. 25.c 221,648.21 17,484,300.47
2 Tutup Penampung Air Bersih 74.00 bh 240,800.00 17,819,200.00
3 Media Tanam 3.11 m3 509,600.00 1,583,836.80
4 Pagar Besi Tempa 69.93 m' 430,080.00 30,075,494.40
5 Tanaman Ketapang Kencana t = 2m 37.00 Btg 336,000.00 12,432,000.00
6 Batu Andesit Susun Sirih 69.38 m2 Err:509 404,106.33 28,034,876.75
Sub Jumlah 151,317,194.69

III PEKERJAAN LAMPU KOLOM


1 Rumah Lampu Custom 89.00 titik 532,000.00 47,348,000.00
2 Instalasi Titik Lampu 89.00 titik 179,200.00 15,948,800.00
3 Lampu LED Warm 7 Watt 89.00 bh 39,200.00 3,488,800.00
4 Box Panel 8.00 set 2,800,000.00 22,400,000.00
Sub Jumlah 89,185,600.00

IV PEKERJAAN KORIDOR
1 Lantai Beton 0.22 m3 A.4.1.1.7 1,281,631.84 287,598.18
2 Pemasangan Andesit Lantai 60 x 30 836.87 m2 A.4.4.3.58 353,349.93 295,707,957.17
3 Jalur Disable 111.86 m2 A.4.4.3.60 339,377.89 37,962,403.12
4 Pekerjaan Pembongkaran Plafond 836.87 m2 25,000.00 20,921,750.00
5 Pekerjaan Plafond Baru 836.87 m2 Err:509 60,927.13 50,988,086.28
6 Instalasi Titik Lampu 109.00 titik 179,200.00 19,532,800.00
7 Fitting Lampu 109.00 titik 36,064.00 3,930,976.00
8 Armature Lampu LED Bulb 13 Watt 109.00 bh 39,200.00 4,272,800.00
9 Bongkaran Beton 64.71 m3 P.Bkr. 01 166,364.75 10,765,429.70
Sub Jumlah 444,369,800.46

V PEKERJAAN SALURAN
1 Pekerjaan Pembongkaran Saluran Lama 373.40 m' 30,000.00 11,202,000.00
2 Cerucuk 1,867.00 bh 17,388.00 32,463,396.00
3 Pasir Alas 12.32 m3 Err:509 204,028.06 2,514,074.50
4 Saluran Air
- Beton K-225 56.76 m3 P.BB. 03 1,281,631.84 72,741,322.01
- Tulangan 3,540.21 kg Err:509 28,425.19 100,631,081.45
- Bekisting 185.21 m2 Err:509 239,427.91 44,343,581.40
5 Grill Besi D16 186.70 m2 285,600.00 53,321,520.00
6 Pekerjaan Batu Andesit
- Pasir Alas 33.61 m3 Err:509 204,028.06 6,856,566.82
- Batu Andesit 60 x 30 485.42 m2 Err:509 353,349.93 171,523,123.75
- Balok Kansteen Beton 14.94 m3 Err:509 1,281,631.84 19,142,453.16
- Bekisting 113.82 m2 Err:509 239,427.91 27,252,642.51
7 Pipa Air Hujan PVC 3" 608.00 m' Err:509 40,719.91 24,757,706.23
Sub Jumlah 566,749,467.82

VI PEKERJAAN BAK SAMPAH


1 Bak Sampah Fiber Glass 150.00 unit Err:509 Err:509
2 Rangka Besi Hollow 4 x 4 cm 42.42 m2 Err:509 Err:509
3 Anyaman Bambu 150.00 unit Err:509 Err:509
Sub Jumlah Err:509

VII PEKERJAAN PORTAL TROTOAR


1 Pondasi Portal
- Beton K 175 10.94 m3 Err:509 1,281,631.84 14,014,644.17
- Tulangan 1,012.82 kg Err:509 Err:509 Err:509
- Bekesting 58.32 m2 Err:509 Err:509 Err:509
2 Pipa Galvanis Dia 4" 126.56 btg Err:509 Err:509
3 Sticker Scotlight Portal 105.95 m2 Err:509 Err:509
Sub Jumlah Err:509

VII PEKERJAAN PENGECATAN KOLOM RUKO

1 Cat Kolom 89.00 titik P.Ct. 01 111,609.61 9,933,255.01


2 Cat dinding Fasad 1,042.34 m2 P.Ct. 02 138,471.26 144,334,131.58
3 Cat Plafond Ruko 633.00 m2 P.Ct. 06 133,399.00 84,441,567.00
4 Cat Marka Jalan 665.00 m2 P.Ct. 08 124,500.00 82,792,500.00
Sub Jumlah 321,501,453.59
VIII PEKERJAAN REKLAME
1 Reklame Ruko 245.25 m2 896,000.00 219,744,000.00
Sub Jumlah 219,744,000.00
X PEKERJAAN PLUMBING
1 Pemasangan paket plumbing Limbah Kotor 664 m P.Plmb. 7 103,877.20 68,974,460.55
2 Pemasangan paket plumbing air bersih dan PDAM 556 m P.Plmb. 7a 86,874.49 48,302,218.07
Sub Jumlah 117,276,678.62

JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN Err:509

DIBULATKAN : DUA MILYAR DUA RATUS LIMA PULUH JUTA LIMA RATUS LIMA PULUHDELAPAN RIBU DUA RATUS RUPIAH Err:509

PPK PENATAAN BANGUNAN Pontianak, 16 Juni 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT
PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T


NIP. 19761001 200812 1 001 YUDHA SANJAYA, ST
Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

F PEKERJAAN GERBANG MARGA TJHIA

I PEKERJAAN PONDASI GERBANG MARGA TJHIA

1 Galian Tanah Pondasi 120 cm x 120 cm x 125 cm jumlah 6 bh 10.80 m3 P.T. 06 139,967.08 1,511,644.41

2 Cerucuk dia 10 - 12 cm pjg 4 m per pondasi 9 buah 54.00 bh Err:509 Err:509

3 Pasir Alas tebal 20 cm 1.20 m3 Err:509 204,028.06 244,833.67

4 Lantai kerja K-100, t = 5 cm 0.30 m3 P.BB. 01 1,070,341.18 321,102.35

5 Tapak Pondasi 100 x 100 cm jumlah 6 Buah

Beton K- 225 1.68 m3 P.BB. 03 1,375,100.42 2,310,168.70

Tulangan M13 254.17 kg Err:509 28,425.19 7,224,942.99

Bekisting 6.72 m2 P.BB. 09 308,298.48 2,071,765.76

6 Kolom Pondasi Uk. 25 x 25 cm jumlah 6 buah kolom pondasi

Beton K- 225 0.27 m3 P.BB. 03 1,375,100.42 376,433.74

Tulangan utama D16 dan D10 Tul Beugel D10 71.53 kg Err:509 28,425.19 2,033,249.58

Bekisting 4.38 m2 P.BB. 12 235,352.48 1,030,843.85

7 Urugan Tanah kembali 7.35 m3 P.T. 09 139,967.08 1,028,233.12

Sub Jumlah Err:509

II PEKERJAAN STRUKTUR DAN ATAP

1 Kolom Uk. 25 x 25 cm jumlah 6 buah Kolom

Beton K- 225 0.32 m3 P.BB. 03 1,375,100.42 438,313.26

Tulangan utama D16 dan D10 Tul Beugel D10 79.83 kg Err:509 28,425.19 2,269,138.89

Bekisting 5.10 m2 P.BB. 12 235,352.48 1,200,297.63

2 Beton Vas Bunga jumlah Vas 6 buah 6.00 unit 1,484,000.00 8,904,000.00

3 Plat Baja 10 mm 1.16 m2 816,219.44 948,120.51

4 Angkur 8 mm 24.00 set 84,000.00 2,016,000.00


5 Rangka Hollow 8/8 Stainless Steel 237.89 m' 630,000.00 149,872,464.00

6 Tanaman Rambat Bugenvil 12.00 bh 61,600.00 739,200.00

7 Media Tanam + Pupuk 0.55 m3 509,600.00 278,217.14

Sub Jumlah 166,665,751.43

III PEKERJAAN LAMPU TIANG GERBANG


1 Rumah Lampu Custom Lampion 4.00 titik 532,000.00 2,128,000.00
2 Instalasi Titik Lampu 2.00 titik 179,200.00 358,400.00
3 Lampu LED Warm 7 Watt 4.00 bh 39,200.00 156,800.00
4 Box Panel 1.00 set 2,800,000.00 2,800,000.00
Sub Jumlah 5,443,200.00
JUMLAH Err:509

Pajak Pertambahan Nilai ( PPN 10 %)

Total Biaya Termasuk PpN Err:509

DIBULATKAN : SERATUS SEMBILAN PULUH SATU JUTA SEMBILAN PULUH ENAM RIBU TUJUH RATUS RUPIAH Err:509

PPK PENATAAN BANGUNAN Pontianak, 16 Juni 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT
PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T


NIP. 19761001 200812 1 001 YUDHA SANJAYA, ST
Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
REKAPITULASI RENCANA ANGGRAN BIAYA (RAB)
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

SUB TOTAL
NO URAIAN PEKERJAAN TOTAL BIAYA (Rp)
(Rp.)

1 2 3 4

F PEKERJAAN GERBANG MARGA TJHIA


I PEKERJAAN PONDASI GERBANG MARGA TJHIA

1 1,511,644.41
Galian Tanah Pondasi 120 cm x 120 cm x 125 cm jumlah 6 bh
2 Cerucuk dia 10 - 12 cm pjg 4 m per pondasi 9 buah Err:509
3 Pasir Alas tebal 20 cm 244,833.67
4 Lantai kerja K-100, t = 5 cm 321,102.35
5 Tapak Pondasi 100 x 100 cm jumlah 6 Buah 11,606,877.45
6 Kolom Pondasi Uk. 25 x 25 cm jumlah 6 buah kolom pondasi 3,440,527.16
7 Urugan Tanah kembali 1,028,233.12
Sub Jumlah Err:509
II PEKERJAAN STRUKTUR DAN ATAP
1 Kolom Uk. 25 x 25 cm jumlah 6 buah Kolom 3,907,749.78
2 Beton Vas Bunga jumlah Vas 6 buah 8,904,000.00
3 Plat Baja 10 mm 948,120.51
4 Angkur 8 mm 2,016,000.00
5 Rangka Hollow 8/8 Stainless Steel 149,872,464.00
6 Tanaman Rambat Bugenvil 739,200.00
7 Media Tanam + Pupuk 278,217.14
Sub Jumlah 166,665,751.43
JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN Err:509

Seratus Delapan Puluh Satu Sembilan Ratus Sembilan


DIBULATKAN : Err:509
Puluh Tiga Ribu Seratus Rupiah

Pontianak, 16 Juni 2019


PPK PENATAAN BANGUNAN Dibuat,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

H PEKERJAAN TUGU

I PEKERJAAN PONDASI TUGU

1 Galian Tanah Pondasi 9.60 m3 P.T. 06 139,967.08 1,343,683.92

2 Cerucuk dia 8 - 10cm pjg 4 m 44.00 bh 17,388.00 765,072.00

3 Pasir Alas 0.96 m3 Err:509 204,028.06 195,866.93

4 Pondasi Beton Bertulang

Beton K225 12.38 m3 P.BB. 03 1,375,100.42 17,029,243.60

Tulangan 423.01 kg Err:509 28,425.19 12,024,075.37

Bekisting 17.03 m2 P.BB. 09 308,298.48 5,251,671.56

5 Mengurug Tanah Kembali 2.21 m3 P.T. 09 139,967.08 309,289.16

6 Balok Sloof 15 x 25

Beton K225 5.76 m3 P.BB. 03 1,375,100.42 7,920,578.42

Tulangan 179.82 kg Err:509 28,425.19 5,111,459.32

Bekisting 2.44 m2 P.BB. 12.a 239,427.91 583,229.15

7 Plat Lantai t = 0,08 m

Beton K225 1.92 m3 P.BB. 03 1,375,100.42 2,640,192.81

Tulangan 13.00 kg Err:509 35,566.11 462,241.47

Pasir Alas 0.17 m3 Err:509 204,028.06 34,072.69

8 Box Culvert

Beton K225 6.91 m3 P.BB. 03 1,375,100.42 9,504,694.10

Tulangan 283.86 kg Err:509 35,566.11 10,095,678.05

Bekisting 12.77 m2 P.BB. 12.a 239,427.91 3,057,911.02

Sub Jumlah 76,328,959.56

II PEKERJAAN STRUKTUR

1 Kolom Struktur Dinding

- Beton K 225 9.56 m3 P.BB. 03 1,375,100.42 13,143,209.81

- Tulangan 216.52 kg Err:509 35,566.11 7,700,765.06

- Bekisting 20.28 m2 P.BB. 12 235,352.48 4,772,948.22

Dinding Beton Reliif

- Pasangan Batako 231.00 m2 P.PD. 3.b 133,000.00 30,723,000.00

- Ukiran relif 254.00 m2 P.PD. 8.b 250,000.00 63,500,000.00

Baja Wf Uk : 150 x 50 x 7 cm panjang 5 meter pengikat bata

- Pemasangan Baja WF 2.00 Btg P.BJ. 28 b 2,725,000.00 5,450,000.00

2 Pemasangan Dinding Bata Merah Ukuran 10 x 40 cm 2 lapis 112.00 m2 P.PD. 3.c 146,300.00 16,385,600.00

3 Plat Pengikat Relif dan Motif Pucuk rebung 12.23 m2 - 133,000.00 1,626,643.20
4 Plat Penutup Tugu

Beton K 225 0.24 m3 P.BB. 03 1,375,100.42 331,509.21

Weremesh m6 13.93 kg P.BB. 08.a 35,566.11 495,426.92

Bekisting 2.41 m2 P.BB. 13 242,439.13 584,472.26

Sub Jumlah 144,713,574.68

III PEKERJAAN DINDING TUGU dan ORNAMEN

1 Ornamen Dinding 4.00 unit 5,367,000.00 21,468,000.00

2 Ornamen dinding reliif 1 12.00 unit 4,389,369.60 52,672,435.20

3 Ornamen Motif Pucuk rebung 2 12.00 unit 4,881,676.80 58,580,121.60

4 Ornamen Ukiran Dari Kuningan 8.00 unit 29,138,995.20 233,111,961.60

Sub Jumlah 365,832,518.40

IV PEKERJAAN ELEKTRIKAL

1 Box Panel 1.00 Set 2,500,000.00 2,500,000.00

2 Instalasi Titik Lampu 3.00 Titik 210,000.00 630,000.00

3 Lampu Wal Waser 18 Wat 8.00 Buah 650,000.00 5,200,000.00

4 Rumah Pengaman Lampu 8.00 Buah 350,000.00

Sub Jumlah 8,330,000.00

JUMLAH 595,205,052.63

Pajak Pertambahan Nilai ( PPN 10 %)

Total Biaya Termasuk PpN 595,205,052.63

DIBULATKAN : LIMA RATUS SEMBILAN PULUH LIMA JUTA DUA RATUS LIMA RIBU RUPIAH 595,205,000.00

Pontianak, 16 Juni 2019


PPK PENATAAN BANGUNAN Dibuat,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)

PEKERJAAN = PERENCANAAN KOTA PUSAKA


LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

G PEKERJAAN GERBANG PASAR HONGKONG


I PEKERJAAN PONDASI GERBANG PASAR HONGKONG
1 Pengadaan Minipile Uk. 20 x 20 x 600 cm sebanyak 26 batang 26.00 Btg 1,345,600.00 34,985,600.00
- Mobilisasi Minipile Ptk-Skw 1.00 Lsm 30,000,000.00 30,000,000.00
2 Pemancangan Minipile 26.00 Btg 147,840.00 3,843,840.00
3 Pembobokan Minipile 26.00 Titik 100,000.00 2,600,000.00
4 Galian Tanah Poer 14.52 m3 P.T. 06 126,900.00 1,842,588.00 ###
5 Poer Pondasi 200 x 200 x 150 cm
- Beton K 300 12.00 m3 P.BB.05.a 2,599,761.88 31,197,142.50
- Tulangan 955.96 kg Err:509 28,425.19 27,173,314.35
- Bekisting 24.00 m2 P.BB. 09 308,298.48 7,399,163.44
6 Kolom Pondasi Dia. 40 cm dengan jumlah kolom 8 buah
- Beton K 250 1.31 m3 P.BB. 04 1,399,815.66 1,828,495.21
- Tulangan 418.48 kg Err:509 28,425.19 11,895,363.82
- Bekisting 13.06 m2 P.BB. 09 308,298.48 4,027,118.02
- Sewa Schafolding 24.00 set 300,000.00 7,200,000.00
Sub Jumlah 163,992,625.34

II PEKERJAAN STRUKTUR
1 Kolom Dia. 40 cm Type 1
Beton K 250 2.80 m3 P.BB. 04 1,399,815.66 3,924,232.03 ###
Tulangan 655.10 kg Err:509 28,425.19 18,621,361.64 ###
Bekisting 28.03 m2 P.BB. 12 235,352.48 6,597,852.49 ###
2 Kolom Dia. 40 cm Type 2
Beton K 250 2.17 m3 P.BB. 04 1,399,815.66 3,038,115.12
Tulangan 517.95 kg Err:509 28,425.19 14,722,829.23
Bekisting 21.70 m2 P.BB. 12 235,352.48 5,108,014.83
3 Kolom Uk. 20 x 20 cm
Beton K 250 0.71 m3 P.BB. 04 1,399,815.66 995,548.90
Tulangan 189.36 kg Err:509 28,425.19 5,382,557.21
Bekisting 14.22 m2 P.BB. 12 235,352.48 3,347,653.62
4 Balok Uk. 25 x 55 cm
Beton K 250 4.13 m3 P.BB. 04 1,399,815.66 5,774,239.60
Tulangan 595.26 kg Err:509 28,425.19 16,920,307.07
Bekisting 40.50 m2 P.BB. 12.a 233,397.25 9,452,588.74
5 Balok Uk. 25 x 25 cm
Beton K 250 0.74 m3 P.BB. 04 1,399,815.66 1,028,864.51
Tulangan 107.77 kg Err:509 28,425.19 3,063,330.86
Bekisting 8.82 m2 P.BB. 12.a 233,397.25 2,058,563.77
6 Ring Balok Uk. 20 x 25 cm ###
Beton K 250 1.30 m3 P.BB. 04 1,399,815.66 1,819,760.36
Tulangan 308.63 kg Err:509 28,425.19 8,772,958.58
Bekisting 18.20 m2 P.BB. 12.a 233,397.25 4,247,830.00
Sub Jumlah 114,876,608.57

III PEKERJAAN ATAP


1 Rangka Atap 61.03 m2 562,000.00 34,300,433.60
2 Penutup Atap Sirap 61.03 m2 P.K.31 470,000.00 28,685,416.00
Sub Jumlah 62,985,849.60

IV PEKERJAAN ORNAMEN DAN KAYU UKIR


1 Ornamen detail A 1.00 Unit 7,352,800.00 7,352,800.00
2 Ornamen detail B 27.12 m' 5,096,000.00 138,203,520.00
3 Ornamen detail C 4.00 Unit 5,165,440.00 20,661,760.00
4 Ornamen detail D 4.00 Unit 7,700,000.00 30,800,000.00
5 Ornamen detail E 4.00 Unit 7,179,200.00 28,716,800.00
6 Ornamen detail F 4.00 Unit 5,703,600.00 22,814,400.00
7 Ornamen detail G 24.00 Unit 3,880,800.00 93,139,200.00
8 Ornamen detail H 14.00 Unit 3,759,280.00 52,629,920.00
9 Ornamen detail I 32.00 Unit 3,626,112.00 116,035,584.00
10 Kayu Ukir 30 x 30 cm 16.00 BH 4,590,062.40 73,440,998.40
11 Kayu Ukir 15 x 55 cm 2.00 BH 7,056,000.00 14,112,000.00
12 Kayu Motif Etnik 24.00 4,141,200.00 99,388,800.00
13 Klos 24.00 BH 84,000.00 2,016,000.00
14 Baut Baja Dia. 16 mm 24.00 Set 28,000.00 672,000.00
15 Angkur Dia. 16 mm 16.00 Set 84,000.00 1,344,000.00
16 Lampu Gerbang
- Rumah Lampu Custom 32.00 titik Err:509 Err:509
- Instalasi Titik Lampu 32.00 titik Err:509 Err:509
- Lampu LED Warm 7 Watt 32.00 bh Err:509 Err:509
- Box Panel 2.00 set Err:509 Err:509
Sub Jumlah Err:509
V KELISTRIKAN
1 Box Panel 3.00 Set 2,800,000.00 8,400,000.00 ###
2 Instalasi Titik Lampu 40.00 Titik 179,200.00 7,168,000.00 ###
3 Lampu LED Warm 7 Watt 40.00 Titik 39,200.00 1,568,000.00 ###
4 Lampu Custom Lampion 4.00 Titik 532,000.00 2,128,000.00
5 Lampu Custom Jembatan 16.00 Titik 532,000.00 8,512,000.00
6 Pipa Pelindung Kabel 45.40 m' 2,352.00 106,780.80
Sub Jumlah 27,882,780.80

JUMLAH Err:509
Pajak Pertambahan Nilai ( PPN 10 %)
Total Biaya Termasuk PpN Err:509

DIBULATKAN : SATU MILYAR SERATUS JUTA ENAM RATUS TUJUH PULUH DELAPAN RIBU EMPAT RATUS RUPIAH Err:509

MENYETUJUI: Pontianak, 23 Maret 2019


KEPALA BIDANG PERMUKIMAN Dibuat,
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
KEPALA DINAS PERUMAHAN, PERMUKIMAN DAN PERTANAHAN
KOTA SINGKAWANG

Ir. AGUS PRIYATNO


NIP.19610127 199003 1 003
PERHITUNGAN VOLUME
Pekerjaan : PERENCANAAN KOTA PUSAKA
Lokasi : KOTA SINGKAWANG
Sumber Dana : APBN
Tahun Anggaran : 2015

NO. URAIAN PEKERJAAN PERHITUNGAN VOLUME VOLUME RIIL UNIT

( 1 ) (2) (3) (4) (7)

I. Pekerjaan Pendahuluan
1 Pengukuran dan pemasangan bouwplank 16.00 m'
8.00 x 1.00 = 8.00 m'
8.00 x 1.00 = 8.00 m'
untuk pekerjaaan bowplank disatukan dengan
pembersihan lokasi

+ 16.00 m'

2 Pembersihan lokasi = 2.00 5.00 lsm


Total Pekerjaan= 18.00 18.00 Unit

3 Listrik kerja dan air kerja 1.00 lsm

4 Pembuatan papan nama proyek 4.00 lsm

5 Pembuatan bangsal kerja 16.00 m2


4.00 x 4.00 = 16.00 m2
+ 16.00 m2

6 Mobilisasi dan Demolisasi 1.00 lsm

RAB JL.DIPONEGORO 2
### Err:509
### Err:509
1 Pot Beton Bertulang
a. Beton K175
luas alas x jumlah x Tinggi
s1 0.20 x 1.00 x 0.75 = 0.15
s2 0.10 x 2.00 x 0.50 = 0.10
s3 0.24 x 1.00 x 0.08 = 0.02
s4 0.08 x 2.00 x 0.08 = 0.01 m3
+ 0.28 m3
jumlah pot diponegoro 2
segmen 1 = 24.00
segmen 2 = 27.00
segmen 3 = 26.00
segmen 4 = 26.00
segmen 5 = 18.00
segmen 6 = 31.00 +
152.00 bh

total beton yang dibutuhkan = 0.28 x 152.00 = 42.86 m3 42.86 m3

b. Tulangan 3,410.27 Kg
Utama Dia. 8 mm p. Segmen T. Segmen : jarak tulangan = jumlah tulangan = bulatkan panjang butuh jumlah =
tulangan tegak s1 0.50 0.50 : 0.15 = 4.33 = 4.00 1.68 m' 2.00 = 3.36 m'
s2 1.00 0.75 : 0.15 = 7.67 = 8.00 5.36 m' 1.00 = 5.36 m'
s3 1.30 0.75 : 0.15 = 9.67 = 10.00 6.70 m' 1.00 = 6.70 m'
s4 0.73 0.50 : 0.15 = 5.87 = 6.00 2.52 m' 2.00 = 5.04 m'
s5 0.50 0.50 : 0.15 = 4.33 = 4.00 1.68 m' 2.00 = 3.36 m'
s6 0.19 0.25 : 0.15 = 2.27 = 2.00 0.34 m' 2.00 = 0.68 m'
24.50 m'
BJ. Dia. 8 = 8.00
= 24.50 x 0.40 = 9.68 Kg

Utama Dia. 8 mm p. Segmen T. Segmen : jarak tulangan = jumlah tulangan = bulatkan panjang butuh jumlah =
tulangan mendatar s1 0.50 0.50 : 0.15 = 4.33 = 4.00 1.68 m' 2.00 = 3.36 m'
s2 0.75 1.00 : 0.15 = 6.00 = 6.00 5.52 m' 1.00 = 5.52 m'
s3 0.75 1.30 : 0.15 = 6.00 = 6.00 7.32 m' 1.00 = 7.32 m'
s4 0.50 0.73 : 0.15 = 4.33 = 4.00 2.60 m' 2.00 = 5.20 m'
s5 0.50 0.50 : 0.15 = 4.33 = 4.00 1.68 m' 2.00 = 3.36 m'
s6 0.25 0.19 : 0.15 = 2.67 = 3.00 0.33 m' 2.00 = 0.66 m'
25.42 m'
BJ. Dia. 8 = 8.00
= 25.42 x 0.40 = 10.04 Kg

Utama Dia. 8 mm p. Segmen T. Segmen : jarak tulangan = jumlah tulangan = bulatkan panjang butuh jumlah =
tulangan alas s1 0.50 0.50 : 0.15 = 4.33 = 4.00 0.84 m' 2.00 = 1.68 m'
s2 1.00 0.50 : 0.15 = 7.67 = 8.00 1.68 m' 1.00 = 1.68 m'
s3 0.50 0.50 : 0.15 = 4.33 = 4.00 0.84 m' 2.00 = 1.68 m'
s4 0.50 1.00 : 0.15 = 4.33 = 4.00 1.84 m' 1.00 = 1.84 m'
6.88 m'
BJ. Dia. 8 = 8.00
= 6.88 x 0.40 = 2.72 Kg

Total Besi Tulangan 9.68 + 10.04 + 2.72 = 22.44 Kg

Total 22.44 x 152.00 bh = 3,410.27 Kg

c. Bekisting Jumlah x Keliling x Tinggi x Persen 363.43 m2


s1 2.00 x 0.93 x 0.50 x 40% 0.37
s2 1.00 x 1.20 x 0.50 x 40% 0.24
s3 1.00 x 1.30 x 0.25 x 40% 0.13
s4 1.00 x 2.00 x 0.50 x 40% 0.40
s5 1.00 x 2.00 x 0.25 x 40% 0.20
s6 2.00 x 1.16 x 0.50 x 40% 0.46
s7 1.00 x 1.95 x 0.75 x 40% = 0.59 m2
2.39 m2

Total 2.39 x 152.00 bh = 363.43 m2

2 Tutup Penampung Air Bersih jumlah tutup dalam 1 segmen pot bunga x jumlah pot
2.00 x 152.00 bh = 304.00 bh 304.00 bh

3 Media Tanam luas alas tinggi tangga jumlah pot 21.89 m3


0.24 x 0.60 = 0.14 m3 152.00 bh = 21.89 m3

4 Pagar Besi Tempa panjang per pot jumlah pot 287.28 m'
1.89 x 152.00 bh = 287.28 m'
5 Tanaman Pucuk Merah 152.00 bh
julah pot = 152.00 bh = 152.00 bh

6 Batu Andesit Bintik bakar 30 x 60 cm Jumlah x Keliling x Tinggi 296.40 M2


s1 2.00 x 0.93 x 0.50 0.93
s2 1.00 x 1.20 x 0.50 0.60
s3 1.00 x 1.30 x 0.25 0.33
s4 2.00 x 0.19 x 0.25 0.10
-
1.95 m2
Data Back Up Volume jumlah pot = 152.00 x 1.95 = 296.40 m2 120
II Pekerjaan Lampu Taman
1 Rumah Lampu Custom 152.00 bh
julah pot = 152.00 bh = 152.00 bh
2 Lampu LED Warm 7 Watt 152.00 bh
AHSP Kementerian PUPR 2016 Tabel Berat Besi
Daftar Berat Besi Beton Polos Daftar Berat Besi Beton Ulir
No Diameter Panjang berat / m' ket No Diameter Panjang berat / m' ket
1 4 11 0.09 1
2 6 12 0.22 2
3 8 12 0.40 3
4 9 12 0.50 4
5 10 12 0.62 5 10 12 0.62
6 11 12 0.75 6 11 12 1.04
7 12 12 0.89 7 12 12 2.23
8 13 12 1.04 8 13 12 2.98
9 15 12 1.21 9 15 12 3.85
10 16 12 1.58 10 16 12 5.04
11 19 12 2.23 11 19 12 6.31
12 22 12 2.98 12 22 12 7.51
13 23 12 3.26 13 23 12 8.92
14 24 12 3.55 14 24 12 10.50
15 25 12 3.85 15
16 28 12 4.83 16
17 31 12 5.93 17
18 32 12 6.31 18
RENCANA ANGGARAN BIAYA
ENGINEERING ESTIMATE (EE)
PEKERJAAN = PERENCANAAN KOTA PUSAKA
LOKASI = KOTA SINGKAWANG
SUMBER DANA = APBN
TAHUN ANGGARAN = 2019

KODE HARGA SATUAN JUMLAH TOTAL SUB TOTAL


NO URAIAN PEKERJAAN VOLUME SAT
ANALISA (Rp.) (Rp.) (Rp.)

1 2 3 4 5 6 7 8

E PEKERJAAN WC UMUM

I PEKERJAAN PONDASI WC UMUM

1 Galian Tanah Pondasi 18.55 m3 P.T. 06 139,967.08 2,596,445.23

2 Cerucuk dia 10 cm pjg 4 m 100.00 bh #REF! #REF!

3 Pasir Alas tebal 10 cm 1.40 m3 #REF! 204,028.06 285,639.28

4 Lantai kerja K 100 5 cm 0.70 m3 P.BB. 01 1,070,341.18 749,238.82

5 Pasangan Batu Pecah 2.10 m3 P.BB.25 1,200,000.00 2,520,000.00

6 Mengurug Tanah Kembali 2.35 m3 P.T. 09 139,967.08 328,978.61

7 Pasangan Batu Kali 12.00 m3 P.BB.26 1,600,000.00 19,200,000.00

Sub Jumlah #REF!

II PEKERJAAN STRUKTUR, LANTAI DAN ATAP

1 Sloof Uk. 15 x 30 cm

Beton K 175 1.35 m3 P.BB. 02 1,281,631.84 1,730,202.98

Tulangan 70.86 kg P.BB. 07 28,425.19 2,014,274.06

Bekisting 4.17 m2 P.BB. 12.a 239,427.91 998,318.62

2 Pasir Urug t = 20 cm 2.45 m3 P.T. 13 204,028.06 499,460.68

3 Plat Lantai

Beton K 175 2.10 m3 P.BB. 02 1,281,631.84 2,691,426.86

Tulangan Wiremesh M5 44.70 kg P.BB. 08.a 35,566.11 1,589,936.73

Bekisting 2.00 m2 P.BB. 13 242,439.13 484,878.26

4 Tiang Pipa Dia 2" Stainless Steel 18.00 m' 71,764.00 1,291,752.00

5 Rangka Atap Hollow 4/4 Stainless Steel 25.20 m2 504,000.00 12,699,741.60

6 Atap Spandek 0,30 mm 25.20 m2 P.BB. 02 -

7 Ram P.BB. 07

Beton K 175 0.24 m3 Err:509 1,281,631.84 313,743.47

Tulangan Wiremesh M5 4.50 kg P.BB. 08 35,566.11 159,902.21

Bekisting 0.41 m2 P.BB. 13 242,439.13 98,915.17

8 Reling Pagar 10.80 m2 1,008,000.00 10,886,400.00

9 Lantai Keramik 21.00 m2 P.Ld. 12 289,720.27 6,084,125.68

Sub Jumlah 41,543,078.32

III PEKERJAAN SEPTITANK DAN RESAPAN

1 Galian Tanah Septitank 1.84 m3 P.T. 06 139,967.08 257,987.31

2 Pasir Alas tebal 15 cm 0.22 m3 Err:509 204,028.06 44,070.06

3 Lantai kerja K 100 5 cm 0.07 m3 P.BB. 01 1,070,341.18 77,064.56

4 Septitank Uk. 120 x 120 x 150 cm

Beton K 175 0.84 m3 Err:509 1,281,631.84 1,080,753.99

Tulangan 73.55 kg Err:509 28,425.19 2,090,794.84

Bekisting 4.15 m2 #REF! #REF! #REF!

5 Galian Tanah Resapan 2.38 m3 P.T. 06 -

6 Batu Belah 1.08 m3 M.020 194,102.00 209,630.16

7 Kerikil 0.65 m3 M.026 345,667.00 223,992.22

8 Pasr Urug 0.43 m3 P.T. 13 204,028.06 88,140.12

9 Ijuk 1.08 m2 7,280.00 7,862.40

10 Tanah Urug 0.22 m3 P.T. 09 139,967.08 30,232.89

11 Pipa Hawa Ø 2" 0.50 m' 23,520.00 11,760.00

12 Pipa Hawa Ø 4" dari Toilet 10.32 m' 54,390.00 561,304.80

13 Pipa Hawa Ø 4" Menuju Resapan 3.00 m' 54,390.00 163,170.00


Sub Jumlah #REF!

IV PEKERJAAN GROUDWATER TANK DAN TOWER AIR

1 Galian Tanah Pondasi 15.50 m3 P.T. 06 139,967.08 2,169,489.66

2 Cerucuk dia 10 cm pjg 4 m 60.00 bh 11,704.00 702,240.00

3 Pasir Alas tebal 10 cm 1.00 m3 Err:509 204,028.06 204,028.06

4 Lantai kerja K 100 5 cm 0.50 m3 P.BB. 01 1,070,341.18 535,170.59

5 Plat Pondasi

Beton K 175 1.13 m3 Err:509 1,281,631.84 1,453,370.51

Tulangan 220.15 kg Err:509 28,425.19 6,257,726.87

Bekisting 1.71 m2 P.BB. 09 308,298.48 527,190.40

6 Kolom 15/15

Beton K 175 0.18 m3 Err:509 1,281,631.84 233,577.40

Tulangan 40.69 kg Err:509 28,425.19 1,156,541.55

Bekisting 0.32 m2 P.BB. 12 235,352.48 76,254.20

7 Sloof Uk. 15 x 20 cm

Beton K 175 0.32 m3 Err:509 1,281,631.84 403,714.03

Tulangan 53.54 kg Err:509 28,425.19 1,521,783.69

Bekisting 4.73 m2 P.BB. 11.a 239,427.91 1,131,296.88

8 Dinding Groundwater

Beton K 175 1.91 m3 Err:509 1,281,631.84 2,452,562.73

Tulangan 371.50 kg Err:509 28,425.19 10,559,914.09

Bekisting 25.52 m2 #REF! 239,427.91 6,109,003.14

9 Plat Penutup

Beton K 175 0.52 m3 Err:509 1,281,631.84 666,128.15

Tulangan 151.35 kg Err:509 28,425.19 4,302,187.22

Bekisting 3.65 m2 #REF! 239,427.91 872,714.73

10 Bak Kontrol (Tutup Bak) 2.00 unit 492,800.00 985,600.00

11 Baja Siku 60.60.6 95.16 m' 11,573.33 1,101,274.54

12 Plat Strip 10 mm 14.02 m2 22,400.00 313,936.00

13 Baut Ø 12 mm 530.00 bh 784.00 415,520.00

14 Baja Profil C-200 105.31 kg 7,840.00 825,608.45

15 Papan Belian 2/15 4.43 kpg 7,402,080.00 32,772,709.20

16 Rangka Besi Hollow pagar Tangki Fiber 4.38 m2 170,240.00 745,651.20

17 Tangki Fiber 1 m3 2.00 bh 2,074,240.00 4,148,480.00

18 Pipa air bersih 3/4" AW 16.30 m' 11,760.00 191,688.00

19 Pipa hisap 3/4" AW 3.00 m' 11,760.00 35,280.00

20 Pipa Galvanis Ø 1" Tangga 15.00 m' 107,245.60 1,608,684.00

21 Mesin Pompa 1.00 set 1,344,000.00 1,344,000.00

Sub Jumlah 85,823,325.29

V PEKERJAAN FLEXIBLE TOILET 5.00 unit 15,120,000.00 75,600,000.00

Sub Jumlah 75,600,000.00

JUMLAH #REF!

Pajak Pertambahan Nilai ( PPN 10 %)

Total Biaya Termasuk PpN #REF!

DIBULATKAN : DUA RATUS DUA PULUH DUA JUTA LIMA RATUS DUA PULUH SATU RIBU DELAPAN RATUS RUPIAH #REF!

PPK PENATAAN BANGUNAN Pontianak, 23 Maret 2019


SATKER PENATAAN BANGUNAN DAN LINGKUNGAN Dibuat,
PROVINSI KALIMANTAN BARAT PT. TRIAS ERISKO KONSULTAN

HERI KASTOMO, S.T YUDHA SANJAYA, ST


NIP. 19761001 200812 1 001 Team Leader

Mengetahui,
SATKER PENATAAN BANGUNAN DAN LINGKUNGAN
PROVINSI KALIMANTAN BARAT

THAMRIN HUSAIN, ST
NIP. 19630625 1991103 1 004
DAFTAR HARGA SATUAN DAN UPAH
Engineering Estimate (EE)
KOTA SINGKAWANG TAHUN 2019
Harga belum
Termasuk
No. Tenaga Kerja Satuan Kode Keuntungan
(Overhead)
(Rp)

A. UPAH PEKERJA
1 Mandor Lapangan Org/hari L.02 167,300.00
2 Mekanik/Juru Ukur/ Operator Alat Berat Org/hari L.03 188,500.00
3 Kepala Tukang Org/hari L.04 157,300.00
4 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.05 136,300.00
5 Operator semi terlatih Org/hari L.06 165,500.00
6 Sopir Org/hari L.07 135,300.00
7 Pembantu Juru Ukur & Pembantu Operator alat berat Org/hari 109,100.00
8 Pekerja / Buruh Lapangan terlatih Org/hari L.01 136,300.00

Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

B. BAHAN PENGISI
1 Batu Kong M³ M.101 145,866.00
2 Batu Palinaman Uk 15 x 15 cm M³ 135,000.00
3 Batu Sap Pinang M³ - 175,344.00
4 Batu pecah 15/20 cm M³ - 145,332.00
5 Batu pecah 10/15 cm M³ M.020 194,102.00
6 Batu pecah 5/7 cm M³ M.022 200,334.00
7 Batu pecah 3/5 cm M³ M.023 256,335.00
8 Batu pecah 2/3 cm M³ M.024 299,334.00
9 Batu pecah 1/2 cm M³ M.025 302,462.00
10 Batu pecah 0,5 - 1 cm / Agregat Kasar M³ M.026 345,667.00
11 Filler Kg - 672.00
12 Chipping M³ - 376,992.00
13 Chipping Kg - 201.60
14 Stone Dust / Agregat Halus M³ - 464,800.00
15 Aspal Kg - 16,691.61
16 Pasir M³ M.040 110,286.00
17 Semen PC Zak M.080 91,300.00
18 Semen PC Kg - 1,826.00
19 Tanah Ex. Peniraman M³ M.050.a 166,040.00
20 Tanah EX. Peladis M³ M.050 166,040.00
21 Paving Block Bh - 2,464.00
22 Paving Stone Bh - 4,065.60
23 Batu Bata 5 x 11 x 22cm Bh - 2,833.60
24 Bataco 15 x 30 x 7 cm Bh - 1,646.40
25 Bataco 20 x 40 x 9 cm ( cetak mesin ) Bh - 2,833.60
26 Bataco 20 x 40 x 7 cm ( cetak mesin ) Bh - 2,587.20
27 Terawang ( roster ) 18 x 18 cm Bh - 3,696.00
28 Keramik 20 x 20 cm Kotak - 88,816.00
29 Keramik 30 x 30 cm Kotak - 88,200.00
30 Keramik 30 x 30 cm Unpolished Kotak - 88,816.00

Daftar Harga Satuan dan Upah - 124


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

31 Keramik 30 x 30 cm Artistik Kotak - 98,336.00


32 Keramik 40 x 40 cm (biasa) Kotak - 80,640.00
33 Keramik 40 x 40 cm (anti gores) Kotak - 264,600.00
34 Keramik 40 x 40 cm Unpolished Kotak - 116,424.00
35 Granito 40 x 40 cm Kotak - 313,600.00
36 Keramik 60 x 60 cm (anti gores) Kotak - 245,280.00
37 Marmer M² - 508,200.00
38 Wood Flooring M² - 308,000.00
39 List Keramik WC. 8 x 20 cm Bh - 271,040.00
40 Plint Kayu uk. 2 x 10 cm M1 - 52,360.00
41 Keramik dinding 20 x 20 cm M² - 88,200.00
42 Keramik dinding 20 x 25 cm M² - 88,200.00
43 Floor Hardener Kg - 9,240.00
44 Beton Ready Mix B 0 M³ - 865,300.00
45 Beton Ready Mix 125 M³ - 1,055,750.00
46 Beton Ready Mix 175 M³ - 1,275,300.00
47 Beton Ready Mix 225 M³ - 1,487,500.00
48 Beton Ready Mix 300 M³ - 1,655,700.00
49 Additive Ready Mix M³ - 49,280.00
50 Karung Goni Curing Beton ( 0.7m² ) Gulung - 12,936.00
51 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 20 x 20, K 300 - 6m Btg - 1,293,600.00
52 Tiang Pancang (Mini Pile / Ready Mix) uk. Π 25 x 25, K 300 - 6m Btg - 1,663,200.00
53 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 28 x 28 x 28, K 300 - 6m Btg - 1,108,800.00
54 Tiang Pancang (Mini Pile / Ready Mix) uk. Δ 32 x 32 x 32, K 300 - 6m Btg - 1,238,160.00
55 Beton U- Ditch 50 x 60 x 120 cm Unit - 600,000.00
56 Pemancangan Mini Pile - 6m Btg - 147,840.00
57 Sewa Pompa Ready Mix (Min. 100 M³) M³ - 61,600.00
58 Bahan Plastik Cor Beton M² - 4,312.00
59 Media Tanam + Pupuk M³ 509,600.00
60 Taman Rambat Bugenvil bh 61,600.00
61 Taman Ketapang Kencana 2m+ bh 336,000.00
62 Taman Pucuk Merah 1m+ bh 255,000.00
63 Beton Vas Bunga unit 1,484,000.00
64 Andesit 30/60 Kotak - 174,272.00
65 Bak Sampah Fiber Glass unit 952,000.00
66 Sticker Scotlite M² 78,400.00
67 Anyaman Bambu Unit 134,400.00
68 Ijuk Resapan M² 7,280.00
69 Ornamen Dinding M² 11,415,936.00
70 Ornamen Lisplank M² 3,986,572.80
71 Ornamen Pagar 1 M² 4,389,369.60
72 Ornamen Pagar 2 M² 4,881,676.80
73 Ornamen Ukiran Dari Kuningan M² 29,138,995.20
74 Reklame m2 896,000.00
-
C. BAHAN KAYU -
1 Ky. Belian tdk ketam Uk. 6/6 - 4 M M³ - 10,904,678.40
2 Ky. Belian tdk ketam Uk. 7/7 - 4 M M³ - 12,839,164.80
3 Ky. Belian tdk ketam Uk. 8/8 - 4 M M³ - 7,796,880.00
4 Ky. Belian tdk ketam Uk. 9/9 - 4 M M³ M.181.a 10,472,616.00
5 Ky. Belian tdk ketam Uk. 10/10 - 4 M M³ M.181.b 8,526,000.00
6 Ky. Belian tdk ketam Uk. 12/12 - 4 M M³ - 9,090,312.00
7 Ky. Belian tdk ketam Uk. 18/18 - 4 M M³ - 8,255,262.40
8 Ky. Belian ketam Uk. 6/6 - 4 M M³ - 10,006,920.00
9 Ky. Belian ketam Uk. 7/7 - 4 M M³ - 10,481,520.00
10 Ky. Belian ketam Uk. 8/8 - 4 M M³ - 12,063,744.00

Daftar Harga Satuan dan Upah - 125


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

11 Ky. Belian ketam Uk. 5/10 - 4 M M³ - 12,063,744.00


12 Ky. Belian ketam Uk. 4/8 - 4 M M³ - 10,587,494.40
13 Papan belian ketam (4m) M³ M.181.e 11,712,960.00
14 Papan belian tdk ketam (4m) M³ M.181.d 11,712,960.00
15 Kayu Papan M³ - 1,848,000.00
16 Ky. klas I Bengkirai uk. 8/8 - 4 M ( ketam ) M³ M.181.f 2,109,744.00
17 Ky. klas I Bengkirai uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.g 2,109,744.00
18 Ky. klas I Bengkirai uk. 7/7 - 4 M ( tdk ketam ) M³ - 5,185,734.40
19 Ky. klas I Bengkirai uk. 7/7 - 4 M ( ketam ) M³ - 6,757,150.40
20 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ - 12,936,000.00
21 Kusen Ky Kelas I Bangkirai uk. 5/10 M³ - 92,400.00
22 Ky. klas II Mabang uk. 8/8 - 4 M ( tdk ketam ) M³ M.181.h 2,293,200.00
23 Ky. klas II Mabang uk. 8/8 - 4 M ( ketam ) M³ M.181.i 2,293,200.00
24 Ky. klas II Mabang uk. 7/7 - 4 M ( tdk ketam ) M³ - 4,171,059.20
25 Ky. klas II Mabang uk. 7/7 - 4 M ( ketam ) M³ - 3,548,776.00
26 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 3,023,563.20
27 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 2,109,800.00
28 Ky. klas II Mabang uk. 5/10 - 4 M ( tdk ketam ) M³ - 3,419,662.40
29 Ky. klas II Mabang uk. 6/10 - 4 M ( tdk ketam ) M³ - 3,633,291.20
30 Ky. klas II Mabang uk. 6/12 - 4 M ( tdk ketam ) M³ - 4,423,988.80
31 Ky. klas II Mabang uk. 4/8 - 4 M ( tdk ketam ) M³ - 4,602,998.40
32 Ky. klas II Mabang uk. 8/15 - 4 M ( tdk ketam ) M³ - 2,823,374.40
33 Ky. klas II Mabang uk. 8/12 - 4 M ( tdk ketam ) M³ - 5,541,043.20
34 Ky klas III uk. 3/5 - 4 M ( tdk ketam) M³ - 1,078,000.00
35 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,364,835.20
36 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 2,440,200.00
37 Papan kayu klas II (mabang) ketam M³ M.181.k 2,440,200.00
38 Papan kayu klas I tdk ketam M³ - 2,928,240.00
39 Papan kayu klas I ketam M³ - 2,928,240.00
40 Papan mal klas III M³ M.181.l 987,840.00
41 Papan Simpiran M³ - 677,353.60
42 Renglat kayu klas I uk 1/8 cm Btg - 21,683.20
43 Kayu profil 10cm Btg - 23,161.60
44 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 23,184.00
45 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg - 11,704.00
46 Kayu cerucuk /dolken ø12 - Pj. 12 M Btg - 88,200.00
47 Kayu cerucuk /dolken ø 18 - Pj. 12 M Btg - 96,300.00
48 Kayu Simpiran / Bakar M³ - 203,280.00
49 Alas kayu hutan Btg - 18,480.00
50 Ornamen detail A Unit 7,352,800.00
51 Ornamen detail B m' 5,096,000.00
52 Ornamen detail C Unit 5,165,440.00
53 Ornamen detailD Unit 7,700,000.00
54 Ornamen detail E Unit 7,179,200.00
55 Ornamen detail F Unit 5,703,600.00
56 Ornamen detail G Unit 3,880,800.00
57 Ornamen detail H Unit 3,759,280.00
58 Ornamen detail I Unit 3,626,112.00
59 Kayu Ukir 30 x 30 cm BH 4,590,062.40
60 Kayu Ukir 15 x 55 cm BH 7,056,000.00
61 Kayu Motif Etnik kpg 4,141,200.00
-
D. BAHAN CAT -
1 Amplas Lbr - 3,528.00
2 Minyak cat Kg - 129,360.00
3 Cat kilat Kg - 129,360.00

Daftar Harga Satuan dan Upah - 126


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

4 Plamur Kg - 23,520.00
5 Cat dasar Kg - 211,680.00
6 Cat tembok Kg - 147,000.00
7 Cat tembok type weather shield Kg - 323,400.00
8 Cat seng Kg - 48,048.00
9 Dempul Kg - 23,520.00
10 Plitur Kg - 43,859.20
11 Thiner Ltr M.090.f 29,400.00
12 Thiner ND Ltr - 36,344.00
13 Melamic Ltr - 63,324.80
14 Vernis Ltr - 34,619.20
15 Meni Kg - 49,526.40
16 Oker Kg - 62,518.40
17 Lem Kayu Kg - 22,848.00
18 Sealent Tube - 154,000.00
19 Soda Api Kg - 13,059.20
20 Sabun / cream pembersih kotoran Kg - 22,792.00
21 Teak Oil Ltr - 49,280.00
22 Ter / Residu Ltr - 28,336.00
23 Kuas 4" Bh - 19,835.20
24 Road Line Paint ( Cat Marka ) Ltr M.090.e 55,440.00
25 Glass Bit Kg M.090.g 40,902.40
26 Weatherbond Emulsion ( cat kerb ) Kg M.090.h 88,704.00
27 Termoplast Kg - 38,192.00
-
E. BAHAN BESI DAN ALUMINIUM -
1 Besi Tulangan Beton ø 8 Kg M.167 21,952.00
2 Besi wire mesh ø 5 Kg - 29,400.00
3 Kawat baja/bendrat Kg M.168 35,280.00
4 Simpai roll Kg - 23,520.00
5 Kawat simpai Kg - 23,520.00
6 Baut dia 4/8 " pj = 20 cm Btg M.163 9,240.00
7 Besi Penahan bh - 12,936.00
8 Beugel plat L. 3 cm bh - 43,120.00
9 Plat 1,2 x 2,4 x 12 Bh - 498,960.00
10 Plat 10mm lbr 627,861.11
11 Besi Konstruksi (I, H) Kg - 20,081.60
12 Besi Konstruksi ( C ) Kg - 20,820.80
13 Besi Konstruksi (siku ) Kg - 20,820.80
14 Kawat Las Btg - 6,160.00
15 Kawat Las Kg - 123,200.00
16 Kawat harmonika M² - 30,800.00
17 Kawat kasa M² - 15,400.00
18 Pipa galvanis dia 3/4" Btg - 166,443.20
19 Pipa galvanis dia 1/2" Btg - 136,505.60
20 Pipa galvanis dia 1" Btg - 214,491.20
21 Pipa galvanis dia 1 1/4" Btg - 302,209.60
22 Pipa galvanis dia 1 1/2" Btg - 350,257.60
23 Pipa galvanis dia 2" Btg - 430,584.00
24 Pipa galvanis dia 3" Btg - 688,072.00
25 Pipa galvanis dia 4" Btg - 490,089.60
26 Folding gate M² - 616,000.00
27 Rangka Aluminium 1 1/2" x 3" Meter - 92,400.00
28 Rangka Aluminium 1 3/4" x 4" Meter - 118,272.00
29 Pintu Aluminium std IKP, lengkap 4" Unit - 2,679,600.00
30 Rangka Baja Ringan Zincalume (truss) + Pemasangan M² - 280,000.00

Daftar Harga Satuan dan Upah - 127


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

31 Alumatek Unit - 2,340,800.00


32 Angkur set 84,000.00
33 Hollow 8/8 Stainless Steel btg 1,260,000.00
34 Hollow 4/4 Stainless Steel btg 504,000.00
35 Tutup Penampung Air Bersih (Costom) bh 240,800.00
36 Pagar Besi Tempa Dia. 20mm M² 430,080.00
37 Grill Besi D16 M² 285,600.00
38 Relling Pagar M² 1,008,000.00
39 Baut Baja dia 16 mm set 28,000.00
40 Pipa Pelindung Kabel Conduit M 2,352.00

F. BAHAN PENGANTUNG
1 Pintu Plastik untuk WC Bh - 338,800.00
2 Kait angin Bh - 23,520.00
3 Handle Bh - 123,200.00
4 Engsel jendela Bh - 32,340.00
5 Engsel pintu Bh - 38,220.00
6 Slot pintu Bh - 22,792.00
7 Slot jendela Bh - 12,936.00
8 Kunci tanam 2 slag (setaraf Belluci) Bh - 206,360.00
9 Kunci tanam 1 slag Bh - 132,440.00
10 Kunci tanam antik Bh - 200,502.40
11 Kunci tanam biasa Bh - 147,000.00
12 Kunci silinder Bh - 120,120.00
13 Door Closer Bh - 138,600.00
14 Door Stoper Bh - 24,640.00
15 Paku Seng Kg M.166.a 35,280.00
16 Paku campuran 1" - 5 " Kg M.166.b 23,520.00
17 Paku beton Kg - 30,800.00
18 Paku Atap Seng Kg M.166.c 35,280.00
19 Paku triplek Kg - 35,280.00
20 Paku GRC Kg - 32,334.40
21 Paku Zincallume Kg - 43,120.00
22 Sekrup Gypsum Kg - 73,920.00
23 Sekrup Fixer Bh - 369.60
24 Engsel Angin Bh - 12,320.00
-
G. BAHAN ATAP -
1 Sirap belian Lbr - 6,160.00
2 Asbes Lbr - 61,600.00
3 Eternit M² - 80,080.00
4 Genteng Metal Sakura Roof 0.35 Lbr - 49,280.00
5 Genteng Metal Type Prima 0.35 Lbr - 77,985.60
6 Genteng Metal Type Royal 0.35 Lbr - 77,985.60
7 Genteng Metal Type Classic 0.35 Lbr - 75,398.40
8 Genteng Metal Stone ( Type Classic 0.35 ) Lbr - 99,545.60
9 Genteng Metal Stone ( Type Prima 0.35 ) Lbr - 99,545.60
10 Genteng Pelentong ( Type Prima 0.35 ) Lbr 37,000.00
11 Atap Metal Supersheet 0.35 (polos) M' - 104,720.00
12 Atap Metal Supersheet 0.35 (polos) M² - 130,961.60
13 Nok bubungan genteng metal 1/2 lingkaran 0.35 (pj 40cm) Bh - 80,080.00
14 Nok bubungan genteng metal kotak 0.35 Meter - 95,603.20
15 Nok bubungan genteng metal stone kotak 0.35 Meter - 113,344.00
16 Seng Gelombang Bjls 30 Lbr - 79,956.80
17 Seng Gelombang Bjls 20 Lbr - 55,272.00

Daftar Harga Satuan dan Upah - 128


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

18 Seng Plat Bjls 20 Lbr - 59,136.00


19 Seng Plat Bjls 30 Lbr - 80,080.00
20 Seng Plat Bjls 30 (lebar 45 cm) M' - 23,408.00
21 Plat Datar Color 0.35 Lbr - 67,760.00
22 Zincalume Gelombang Persegi 0.35 (polos) M² - 127,814.40
23 Zincalume Gelombang Persegi 0.30 (polos) M² - 112,414.40
24 Zincalume Gelombang Persegi 0.35 (color) M² - 143,214.40
25 Zincalume Gelombang Persegi 0.30 (color) M² - 127,814.40
26 Zincalume Plat 0.2 Lbr - 146,608.00
27 Aluminium Foil M² - 61,600.00
-
H. BAHAN KACA -
1 Kaca Polos, t = 5 mm M² - 211,680.00
2 Kaca Polos, t = 12mm M² - 473,088.00
3 Kaca Rayben, t = 5 mm M² - 163,856.00
4 Kaca Cermin t = 3mm M² - 175,560.00
5 Kaca Patri M² - 1,170,400.00
6 Sealent Kg - 125,048.00
7 Nako + Bingkai (80 x 15) x 10 daun polos Bh - 240,240.00
8 Nako + Bingkai (80 x 15) x 10 daun rayben Bh - 252,560.00
9 Kaca Es M² - 187,264.00
-
I. BAHAN TRIPLEK -
1 Triplek t = 3 mm Lbr - 88,200.00
2 Triplek t = 6 mm Lbr - 149,072.00
3 Triplek t =9 mm Lbr - 184,800.00
4 Multiplek t = 10 mm Lbr - 246,960.00
5 Multiplek t = 12 mm Lbr - 211,680.00
6 Plywood 4' x 8' x 4mm Lbr - 122,460.80
7 Panel GRC 120 x 240 x 40 Lbr - 94,080.00
8 GypsumBoard t = 9mm Lbr - 75,152.00
-
J. BAHAN SANITASI -
1 Kloset duduk monoblok Bh - 576,240.00
2 Kloset duduk putih (setaraf TOTO) Bh - 2,402,400.00
3 Kloset duduk warna (setaraf TOTO) Bh - 2,624,160.00
4 Kloset jongkok (setaraf TOTO) Bh - 229,152.00
5 Kloset jongkok (setaraf INA) Bh - 154,000.00
6 Kran air uk 1/2" Bh - 35,280.00
7 Pipa paralon dia 1/2" Btg - 14,700.00
8 Pipa paralon dia 3/4" Btg - 23,520.00
9 Pipa paralon dia 1" Btg - 18,816.00
10 Pipa paralon dia 2" Btg - 47,040.00
11 Pipa paralon dia 3" Btg - 70,560.00
12 Pipa paralon dia 4" Btg - 108,780.00
13 Pipa Tanah Btg - 96,400.00
14 Seal Tape Set - 6,160.00
15 Bak Kontrol Unit - 492,800.00
16 Plat Strip m - 22,400.00
17 Baja Siku m 11,573.33
18 Baut dia 12 mm bh 784.00
19 Baja Profil C-200 kg 7,840.00
20 Papan Belian 2/15 kpg 7,402,080.00
21 Rangka Besi Hollow pagar Tangki Fiber m2 170,240.00
22 Tangki Fiber 1 m3 bh 2,074,240.00
23 Mesin Pompa set 1,344,000.00

Daftar Harga Satuan dan Upah - 129


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

24 Flexible Toilet Type A set 19,600,000.00


25 Flexible Toilet Type B set 16,800,000.00
26 Flexible Toilet Type C set 15,120,000.00
-
K. BAHAN MINYAK (TANPA KEUNTUNGAN) -
1 Minyak solar Ltr M.183 5,040.00
2 Bensin premium Ltr M.184 6,272.00
3 Minyak pelumas Ltr M.185 38,760.96
4 Oli BEO 154W40/Cat Ltr - 38,808.00
5 Minyak tanah Ltr M.064 5,712.00
6 Minyak tanah industri Ltr - 6,832.00
7 Gas Elpiji Kg - 9,296.00
8 Alat-alat bantu Set M.170 63,840.00
9 Sewa Alat Untuk Pengelasan Jam - 70,000.00
10 Sewa Molen Set - 168,000.00
11 Sewa kuali termasuk angkutan Set - 70,896.00
-
L. BAHAN ALAT-ALAT LISTRIK -
60 Seri 200 Biji Kotak - 62,104.00
61 Seri Kuning Kotak - 62,104.00
Rumah Lampu Custom titik 532,000.00
Instalasi Titik Lampu titik 179,200.00
Lampu LED Warm 7 Watt bh 39,200.00
Box Panel set 2,800,000.00
Fitting Lampu Buah 36,064.00
Tiang Lampu Unit 8,400,000.00
1 Neon Sen Meter - 46,614.40
2 Pijar 5 Watt Buah - 2,352.00
3 Pijar 20 Watt Buah - 3,897.60
4 Pijar 25 Watt Buah - 3,897.60
5 Pijar 40 Watt Buah - 3,897.60
6 Pijar 60 Watt Buah - 5,544.00
7 Pijar 75 Watt Buah - 5,544.00
8 Pijar 80 Watt Buah - 4,412.80
9 Pijar 100 Watt Buah - 6,977.60
10 Pijar 200 Watt Buah - 15,500.80
11 Neon 40 Watt Buah - 14,672.00
12 Neon 20 Watt Buah - 10,158.40
13 Neon 10 Watt Buah - 5,846.40
14 Lampu Ekorola TRX 800 - 20 watt (set) Set - 602,649.60
15 Lampu Light Grick Buah - 147,627.20
16 Lampu Genite 16 Watt Buah - 46,603.20
17 Lampu XL 14 Watt Buah - 38,808.00
18 Lampu Sorot 300 Watt Buah - 154,000.00
19 Lampu Nepalos 25 Watt Buah - 38,808.00
20 Lampu Superlox 25 Watt Buah - 6,160.00
21 Lampu Superlox 40 Watt Buah - 6,977.60
22 Lampu Fisikom 25 Watt Buah - 38,808.00
23 Lampu Fisikom 23 Watt Buah - 38,808.00
24 Lampu Fisikom 18 Watt Buah - 31,102.40
25 Lampu Mercury 125 Watt Buah - 78,635.20
26 Lampu Mercury 250 Watt Buah - 166,006.40
27 Lampu Sunyco 45 Watt Buah - 93,217.60
28 Lampu Matsuka 8 Watt Buah - 23,296.00
29 Lampu Matsuka 14 Watt Buah - 24,841.60
30 Lampu Matsuka 18 Watt Buah - 35,728.00

Daftar Harga Satuan dan Upah - 130


Harga Termasuk
blm termasuk
No. Material Satuan Kode Keuntungan
(Overhead)
(Rp)

31 Lampu Matsuka 20 Watt Buah - 41,988.80


32 Lampu Matsuka 25 Watt Buah - 43,523.20
33 Lampu Par 38 Watt Buah - 57,489.60
34 Lampu Taman Buah - 38,808.00
35 SL 15 Watt Buah - 129,360.00
36 SL 18 Watt Buah - 50,388.80
37 SL 25 Watt Buah - 65,172.80
38 TL Rina 32 Watt Buah - 31,001.60
39 Bola Essetial Buah - 37,363.20
40 Bola Spot Light Buah - 58,206.40
41 Hologen 500 Watt Buah - 45,068.80
42 Hologen 1.000 Watt Buah - 88,592.00
43 Hologen 1.500 Watt Buah - 100,912.00

Daftar Harga Satuan dan Upah - 131


Rekapitulasi Analisa Harga Satuan Pekerjaan
Engineering Estimate (EE)
Tahun 2019
Kota Singkawang

No. Kode Nama Pekerjaan Satuan Harga Satuan

1 2 3 4 5

(P.Ps) HARGA SATUAN PEKERJAAN PERSIAPAN


1 P.Ps. 02 Pengukuran dan Pemasangan 1 m' Bouwplank m¹ Rp. 366,460.84
2 P.Ps. 04 (P.Ps.04) Pembuatan 1 m² bedeng pekerja m² Rp. 1,354,582.73

(P.T) HARGA SATUAN PEKERJAAN TANAH


1 P.T. 06 Penggalian 1 m3 Tanah Biasa m³ Rp. 139,967.08
2 P.T. 09 Pengurugan Kembali Tanah 1 m3 Tanah Galian m³ Rp. 87,992.25
3 P.T. 13 Pengurugan 1 m3 dengan pasir urug m³ Rp. 204,028.06

(P.BB) HARGA SATUAN PEKERJAAN BETON BERTULANG


1 P.BB. 01 Membuat 1 m3 Beton Mutu f'c = 7,4 Mpa (K 100), Slump (12..2) cm, w/c = 0.87 m³ Rp. 1,070,341.18
2 P.BB. 02 Membuat Beton Mutu f'c = 14,5 Mpa (K 175), slump (12 ± 2) cm, w/c = 0,66 m³ Rp. 1,281,631.84
3 P.BB. 03 Membuat 1m3 Beton Mutu f'c = 19,3 Mpa (K 225)Ready Mix, slump (12 ± 2) cm, w/c = 0,58 m³ Rp. 1,375,100.42
4 P.BB. 04 Membuat Beton Mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 m³ Rp. 1,399,815.66
5 P.BB. 05 Membuat Beton Mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 m³ Rp. 1,527,839.24
6 P.BB. 23 c Pemasangan Beton U ditch 50 x 60 x 120 m3 Rp. 628,009.60
7 P.BB.05.a Membeli dan Mengerjakan 1 m3 Beton Ready Mix K 300 m³ Rp. 2,599,761.88
8 P.BB. 07 Pembesian 10 kg dengan besi polos atau besi ulir 10 kg Rp. 284,251.94
9 P.BB. 07.a Pembesian 1 kg dengan besi polos atau besi ulir 1 jg Rp. 14,837.70
10 P.BB. 08 Pemasangan 10 kg jaring kawat baja (wiremesh) 10 kg Rp. 355,661.08
11 P.BB. 08.a Pemasangan 1 kg jaring kawat baja (wiremesh) 1 kg Rp. 35,566.11
12 P.BB. 09 Pemasangan 1 m2 bekisting untuk pondasi m² Rp. 308,298.48
13 P.BB. 11.a Pemasangan 1 m2 bekisting untuk sloof m² Rp. 239,427.91
14 P.BB. 12 Pemasangan 1 m2 bekisting untuk kolom m² Rp. 235,352.48
15 P.BB. 12.a Pemasangan 1 m2 bekisting untuk balok m² Rp. 233,397.25
P.BB. 25.c Pemasangan 1 m2 bekisting untuk dinding m² Rp. 221,648.21
16 P.BB. 13 Pemasangan 1 m2 bekisting untuk lantai m² Rp. 242,439.13
17 P.BB.25 Pasang Batu Pecah m³ Rp. 1,200,000.00
18 P.BB.26 Pasangan Batu Kali m³ 1,600,000.00

(P.Dnd) HARGA SATUAN PEKERJAAN PASANGAN DINDING


1 P.Dnd. 01 1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01) m² Rp. 89,913.50

(P.Pls) HARGA SATUAN PEKERJAAN PLESTERAN


1 P.Pls. 01 Pemasangan 1 m2 Plesteran 1 SP : 2 PP tebal 15 mm m² Rp. 100,140.56
2 P.Pls. 07 Pemasangan 1 m2 acian m² Rp. 57,581.08

(P.Ld) HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING


2 P.Ld. 12 Pemasangan 1 m2 lantai ubin teralux marmer ukuran 60cm x 60cm m³ Rp. 289,720.27
3 P.Ld. 34 Pemasangan 1 m2 lantai keramik ukuran 20 cm x 20 cm m² Rp. 316,862.20
4 P.Ld.34.a Pemasangan 1 m² lantai Andesit 30/60 m² Rp. 353,349.93
5 P.Ld.34.b Pemasangan 1 m² lantai Andesit 30/60 m² Rp. 402,910.35
P.Ld.34.c Pemasangan 1 m² pot batu palimanan 15/15 m² Rp. 429,144.09
6 P.Ld.34.d Pemasangan 1 m² lantai Disable 30/30 m² Rp. 339,377.89
7 P.Ld. 40 Pemasangan 1 m2 dinding keramik ukuran 20 cm x 20 cm m¹ Rp. 361,805.40
8 P.Ld.40.a Pemasangan 1 m² dinding Batu Andesit 30/60 m² Rp. 404,106.33
9 P.Ld. 46 Memasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II m² Rp. 398,090.80
10 P.Ld. 47 Memasang Dinding Lambriziring dari Papan Kayu Kelas I m² Rp. 319,676.40
11 P.Ld. 47.a Memasang Dinding Lambriziring dari Papan Kayu Belian m² Rp. 400,472.30
12 P.Ld. 48 Memasang Dinding Lambriziring dari Plywood ukuran (120 x 240) cm m² Rp. 67,945.00
13 P.Ld. 49 Pasang List Plafond, Kayu Profil m¹ Rp. 10,818.75
14 P.Ld. 50 Pemasangan Lantai Papan Kayu Belian m² Rp. 755,543.60
15 P.Ld. 51 Pemasangan Lantai Papan Kayu Kelas I m² Rp. 479,714.80

Rekapitulasi Analisa Harga Satuan Pekerjaan - 132


No. Kode Nama Pekerjaan Satuan Harga Satuan

1 2 3 4 5

(P.Pf) HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)


1 P.Pf. 01 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm m² Rp. 75,807.46
4 P.Pf. 07 Pemasangan 1 m2 langit-langit gypsump board ukuran (120 x 240 x 9) mm, tebal 9 mm m¹ Rp. 60,927.13

(P.PA) HARGA SATUAN PEKERJAAN PENUTUP ATAP


1 P.PA.03 1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03) m² Rp. 89,913.50
2 P.PA.07 1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. 07) m¹ Rp. 84,020.02

(P.K) HARGA SATUAN PEKERJAAN KAYU


1 P.K. 01 Pembuatan dan Pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas 1 m³ Rp. 21,260,202.95
2 P.K. 02 Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II atau III m² Rp. 132,033.50
3 P.K. 15 Pemasangan 1 m2 listplank ukuran (3x20) cm, kayu kelas I atau kelas II m¹ Rp. 84,615.46

Rekapitulasi Analisa Harga Satuan Pekerjaan - 133


No. Kode Nama Pekerjaan Satuan Harga Satuan

1 2 3 4 5

(P.KK) HARGA SATUAN PEKERJAAN KUNCI DAN KACA


1 P.KK. 09 Pemasangan 1 m2 kaca tebal 5 mm m² Rp. 303,695.73

(P.Ct) HARGA SATUAN PEKERJAAN PENGECATAN


1 P.Ct. 01 Pengecatan1 m² bidang kayu baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m² Rp. 111,609.61
2 P.Ct. 04a Pengecatan 1 m² tembok baru ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m² Rp. 138,471.26
3 P.Ct. 06 Pengecatan 1 m² Plafond ( 1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m² Rp. 133,399.00
4 P.Ct. 08 Pengecatan 1 m² Marka jalan ( 1 lapis cat dasar, 1lapis cat penutup) m² Rp. 35,355.00
(P.Snt) HARGA SATUAN PEKERJAAN SANITASI
1 P.Snt. 04 Pemasangan 1 buah closet jongkok porslen buah Rp. 727,172.44
2 P.Snt. 11 Pemasangan 1 buah floor drain buah Rp. 48,146.48
3 P. Snt. 18 Pemasangan 1 buah kran diameter 1/2" atau 3/4" buah Rp. 119,482.13

(P.PLMB) HARGA SATUAN PEKERJAAN PLUMBING


1 P.Plmb. 7 Pemasangan Jaringan Limbah Kotor m' Rp 103,877.20
2 P.Plmb. 7a Pemasangan Jaringan Air Bersih dan PDAM m' Rp 86,874.49

(P. Bkr) PEKERJAAN BONGKARAN


1 P.Bkr. 01 1m3 Pekerjaan Bongkaran Beton Bertulang (P.Bkr. 01) m³ Rp. 166,364.75
2 P.Bkr. 02 1m2 Pekerjaan Bongkaran Dinding Tembok Plesteran Simpai (P. Bkr. 02) m² Rp. 85,750.00
3 P.Bkr. 03 1m2 Pekerjaan Bongkaran Lantai Ubin / Keramik (P.Bkr. 03) m² Rp. 4,287.50
4 P.Bkr. 04 1m2 Pekerjaan Bongkaran Atap Genteng / Sirap (P.Bkr. 04) m² Rp. 1,375.00
5 P.Bkr. 05 1m2 Pekerjaan Bongkaran Atap Seng (P.Bkr. 05) m² Rp. 13,750.00
6 P.Bkr. 06 1m2 Pekerjaan Bongkaran Rangka Atap Kayu (P.Bkr. 06) m² Rp. 85,750.00
7 P.Bkr. 07 1m3 Pekerjaan Bongkaran Rangka Badan Kayu (P.Bkr. 07) m³ Rp. 674,666.67

Rekapitulasi Analisa Harga Satuan Pekerjaan - 134


Analisa Harga Satuan Pekerjaan
Engineering Estimate (EE)

Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.297 23,760.00
2 Tukang Batu OH 100,000.00 0.033 3,300.00
3 Tukang Kayu OH 100,000.00 0.033 3,300.00
4 Tukang Besi OH 100,000.00 0.033 3,300.00
5 Kepala Tukang OH 115,000.00 0.010 1,150.00
6 Mandor OH 115,000.00 0.015 1,725.00
Jumlah 36,535.00
B Bahan
1 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M3 2,806,300.00 0.003 8,418.90
2 Paku 2" - 5" Kg 26,600.00 0.020 532.00
3 Minyak Bekisting Lt 8,900.00 0.000 0.00

4 Besi Beton Polos Kg 22,300.00 3.600 80,280.00

5 Kawat Ikat Beton (bendrat) Kg 25,400.00 0.050 1,270.00


6 Semen Portland Kg 1,900.00 5.500 10,450.00
7 Pasir M3 164,500.00 0.009 1,480.50
8 Batu pecah 1-2 cm (Kerikil) M3
484,700.00 0.015 7,270.50
Jumlah 109,701.90

C Jumlah A + B 146,236.90

D Harga Satuan 146,236.90

Acuan : SNI DT 91-0008-2007

E. PEKERJAAN DINDING (P.Dnd.)

1m2 Pasang Batako uk. 15/30/7(P.Dnd. 01)


Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH Err:509 0.32 Err:509
2 Tukang Batu OH 136,300.00 0.10 13,630.00
3 Kepala Tukang OH 157,300.00 0.01 1,573.00
4 Mandor OH 167,300.00 0.015 2,509.50
Jumlah Err:509
B Bahan
1 Batako 15/30/7 (cetak mesin) Bh 1,646.40 22.000 36,220.80
2 Semen Portland Kg 1,826.00 7.500 13,695.00
3 Pasir Beton / Pasang M3 110,286.00 0.027 2,977.72
Jumlah 52,893.52
C Jumlah A + B Err:509
D Overhead & Profit (Contoh 10 % ) 10 % x D Err:509
E Harga Satuan Pekerjaan (C+D) Err:509

Acuan : ABK Bangunan Gedung dan Perumahan - 6.20

Memasang 1m2 Dinding Terawang (roster) ukuran (18x18) cm, campuran 1Pc : 4Ps (P.Dnd. 06)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga

Analisa Harga Satuan Pekerjaan - 135


1 Pekerja OH 80,000.00 0.300 24,000.00
2 Tukang Batu OH 100,000.00 0.100 10,000.00

3 Kepala Tukang OH 115,000.00 0.010 1,150.00

4 Mandor OH 115,000.00 0.015 1,725.00


Jumlah 36,875.00
B Bahan

1 Terawang (roster) Bh 33,900.00 30 1,017,000.00


2 Semen Portland Kg 1,900.00 11.000 20,900.00
3 Pasir M3 164,500.00 0.035 5,757.50
Jumlah 1,043,657.50
C Jumlah A + B 1,080,532.50
D Harga Satuan 1,080,532.50

Acuan : SNI DT 91-0009-2007

D Harga Satuan 479,714.80

Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - F.38

H. PEKERJAAN PENUTUP ATAP (P.PA.)

A Tenaga

1 Pekerja OH 80,000.00 0.200 16,000.00

2 Tukang kayu OH 100,000.00 0.100 10,000.00

3 Kepala Tukang OH 115,000.00 0.010 1,150.00

4 Mandor OH 115,000.00 0.001 115.00

Jumlah 27,265.00
B Bahan
1 Genteng Metal Type PRIMA 0.35 Lbr 69,630.00 1.840 128,119.20
2 Paku Kg 26,600.00 0.200 5,320.00
Jumlah 133,439.20
C Jumlah A + B 160,704.20
D Harga Satuan 160,704.20
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Type ROYAL 0.35 (P.PA. 02)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.200 16,000.00
2 Tukang kayu OH 100,000.00 0.100 10,000.00
3 Kepala Tukang OH 115,000.00 0.010 1,150.00
4 Mandor OH 115,000.00 0.001 115.00
Jumlah 27,265.00
B Bahan
1 Genteng Metal Type ROYAL 0.35 Lbr 89,300.00 1.710 152,703.00
2 Paku Kg 26,600.00 0.200 5,320.00
Jumlah 158,023.00
C Jumlah A + B 185,288.00
D Harga Satuan 185,288.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

Analisa Harga Satuan Pekerjaan - 136


1m2 Pasang Atap Genteng Metal Type CLASSIC 0.35 (P.PA. 03)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH Err:509 0.200 Err:509
2 Tukang kayu OH 136,300.00 0.100 13,630.00
3 Kepala Tukang OH 157,300.00 0.010 1,573.00
4 Mandor OH 167,300.00 0.001 167.30
Jumlah Err:509
B Bahan
1 Genteng Metal Type CLASSIC 0.35 Lbr 75,398.40 1.620 122,145.41
2 Paku Kg 35,280.00 0.200 7,056.00
Jumlah 129,201.41
C Jumlah A + B Err:509
D Overhead & Profit (Contoh 10 % ) 10 % x D Err:509
E Harga Satuan Pekerjaan (C+D) Err:509
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Stone Type CLASSIC 0.35 (P.PA. 04)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.200 16,000.00
2 Tukang kayu OH 100,000.00 0.100 10,000.00
3 Kepala Tukang OH 115,000.00 0.010 1,150.00
4 Mandor OH 115,000.00 0.001 115.00
Jumlah 27,265.00
B Bahan
1 Genteng Metal Stone Type CLASSIC 0.35 Lbr 141,000.00 1.620 228,420.00
2 Paku Kg 26,600.00 0.200 5,320.00
Jumlah 233,740.00
C Jumlah A + B 261,005.00

D Harga Satuan 261,005.00

Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Genteng Metal Stone Type PRIMA 0.35 (P.PA. 05)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.200 16,000.00
2 Tukang kayu OH 100,000.00 0.100 10,000.00
3 Kepala Tukang OH 115,000.00 0.010 1,150.00
4 Mandor OH 115,000.00 0.001 115.00
Jumlah 27,265.00
B Bahan
1 Genteng Metal Stone Type PRIMA 0.35 Lbr 141,000.00 1.840 259,440.00
2 Paku Kg 26,600.00 0.200 5,320.00
Jumlah 264,760.00
C Jumlah A + B 292,025.00
D Harga Satuan 292,025.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.32

1m2 Pasang Atap Sirap Belian (P.PA. 06)


Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.166 13,280.00
2 Tukang kayu OH 100,000.00 0.250 25,000.00

Analisa Harga Satuan Pekerjaan - 137


3 Kepala Tukang OH 115,000.00 0.025 2,875.00
4 Mandor OH 115,000.00 0.008 920.00
Jumlah 42,075.00
B Bahan
1 Genteng Sirap Belian Bh 7,100.00 60.000 426,000.00
2 Paku 1/2" - 1" Kg 26,600.00 0.200 5,320.00
Jumlah 431,320.00
C Jumlah A + B 473,395.00
D Harga Satuan 473,395.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.33

1m1 Pekerjaan Bubungan dengan Seng Datar Color 0.35 / 10 m1 (P.PA. 07)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH Err:509 0.250 Err:509
2 Tukang kayu OH 136,300.00 0.250 34,075.00
3 Kepala Tukang OH 157,300.00 0.025 3,932.50
Jumlah Err:509
B Bahan
1 Paku Kg 23,520.00 0.100 2,352.00
2 Seng Datar Color 0.35 Lbr 80,080.00 6.000 480,480.00
3 Papan Kayu Kelas II (tdk ketam) M3 2,440,200.00 0.072 175,694.40
Jumlah 658,526.40
C Jumlah A + B Err:509
D Overhead & Profit (Contoh 10 % ) 10 % x D Err:509
Jadi 1 M1 Err:509
E Harga Satuan Pekerjaan (C+D) Err:509
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10
1m2 Pasang Zincalume Gelombang Persegi 0.35 (Colour) (P.PA. 17)
Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.150 12,000.00
2 Tukang kayu OH 100,000.00 0.750 75,000.00
3 Kepala Tukang OH 115,000.00 0.008 920.00
4 Mandor OH 115,000.00 0.006 690.00
Jumlah 88,610.00
B Bahan
1 Zincalume 0.35 (Colour) M2 184,900.00 1.050 194,145.00
2 Paku Zincalume Kg 800.00 0.020 16.00
Jumlah 194,161.00
C Jumlah A + B 282,771.00
D Harga Satuan 282,771.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.38

1m1 Pekerjaan Bubungan Atap Seng BJLS 30 / 10m1 (P.PA. 18)


Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Tukang Kayu OH 100,000.00 0.250 25,000.00
2 Kepala Tukang Kayu OH 115,000.00 0.025 2,875.00
3 Pekerja OH 80,000.00 0.250 20,000.00
Jumlah 47,875.00
B Bahan
1 Paku Kg 26,600.00 0.100 2,660.00
2 Seng Plat BJLS 0.30 Lbr 91,700.00 6.000 550,200.00
3 Papan Kayu Kelas II (Tidak Ketam) M3 4,546,000.00 0.072 327,312.00
Jumlah 880,172.00
C Jumlah A + B 928,047.00
D Harga Satuan 928,047.00
Jadi 1 M1 92,804.70

Analisa Harga Satuan Pekerjaan - 138


Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - H.10

1m2 Pasang Aluminium Foil / Sealation (P.PA. 19)


Harga Satuan
No. Uraian Pekerjaan Satuan Kuantitas Biaya Satuan (Rp)
(Rp)
1 2 3 4 5 6
A Tenaga
1 Pekerja OH 80,000.00 0.150 12,000.00
2 Tukang Kayu OH 100,000.00 0.050 5,000.00
3 Kepala Tukang OH 115,000.00 0.005 575.00
4 Mandor OH 115,000.00 0.008 920.00
Jumlah 18,495.00
B Bahan
1 Aluminium Foil M2 75,400.00 1.050 79,170.00
Jumlah 79,170.00
C Jumlah A + B 97,665.00
D Harga Satuan 97,665.00
Acuan : ABK Bangunan Gedung dan Perumahan - 6.42

Analisa Harga Satuan Pekerjaan - 139


Daftar Harga Upah, Bahan dan Alat
Engineering Estimate (EE)

Harga Termasuk
Keuntungan
No. Tenaga Kerja Satuan Kode
(Overhead)
(Rp)

A. UPAH
1 Mandor Lapangan Org/hari L.061 115,000.00
2 Kepala Tukang Org/hari L.073 115,000.00
3 Tukang Batu / Kayu / Gali / Besi / Cor / Semen / Cat / Listrik / Pancang Org/hari L.079 100,000.00
4 Pekerja / Buruh Lapangan Tak terlatih Org/hari L.101 80,000.00

Harga Termasuk
Keuntungan
No. Material Satuan Kode
(Overhead)
(Rp)

B. BAHAN PENGISI
1 Batu pecah 15/20 cm M³ - 322,600.00
2 Batu pecah 1/2 cm M³ M.025 484,700.00
3 Pasir M³ M.041 164,500.00
4 Semen PC Kg - 1,900.00
5 Tanah Ex. Peniraman M³ M.050.a 125,900.00
6 Bataco 15 x 30 x 7 cm Bh - 1,700.00
7 Keramik 20 x 20 cm Kotak - 72,700.00
8 Keramik 40 x 40 cm (anti gores) Kotak - 268,100.00
9 Keramik 60 x 60 cm (anti gores) (Setaraf Decogress) Kotak - 277,000.00
10 Keramik dinding 20 x 25 cm M² - 72,700.00

C. BAHAN KAYU
1 Ky. klas I Bengkirai uk. 5/10 - 4 M ( ketam / untuk kusen ) M³ - 8,418,500.00
2 Ky. klas II Mabang uk. 4/6 - 4 M ( tdk ketam ) M³ - 4,209,400.00
3 Ky. klas II Mabang uk. 5/7 - 4 M ( tdk ketam ) M³ - 5,291,700.00
4 Ky klas III uk. 4/6 - 4 M ( tdk ketam) M³ - 2,806,300.00
5 Papan kayu klas II (mabang) tdk ketam M³ M.181.j 4,546,000.00
6 Papan kayu klas I ketam M³ - 9,260,200.00
7 Papan mal klas III M³ M.181.l 2,806,300.00
8 Kayu cerucuk /dolken ø 6 - 8 - Pj. 4 M Btg - 13,700.00
9 Kayu cerucuk /dolken ø10 - Pj. 4 M Btg - 17,700.00
10 Kayu cerucuk /dolken ø12 - Pj. 9 M Btg - 94,400.00

D. BAHAN CAT
1 Cat kilat Kg - 60,900.00
2 Cat dasar Kg - 26,800.00
3 Cat tembok Kg - 87,400.00
4 Dempul Kg - 44,300.00
5 Meni Kg - 76,700.00
6 Oker Kg - 34,600.00
7 Lem Kayu Kg - 29,100.00

E. BAHAN BESI DAN ALUMINIUM


1 Besi Tulangan Beton Kg M.167 22,300.00
2 Besi wire mesh ø 5 Kg - 24,300.00
2 Kawat baja/bendrat Kg M.168 25,400.00

Daftar Harga Satuan dan Upah - 140


Harga Termasuk
Keuntungan
No. Material Satuan Kode
(Overhead)
(Rp)

F. BAHAN PENGANTUNG
1 Kait angin (stainles) Bh - 14,000.00
2 Engsel jendela (stainles) Bh - 30,800.00
3 Engsel pintu (stainles) Bh - 52,500.00
4 Slot pintu (stainles) Bh - 28,000.00
5 Slot jendela (stainles) Bh - 7,100.00
6 Kunci tanam 2 slag (setaraf Belluci) Bh - 223,800.00
7 Paku campuran 1" - 5 " Kg M.166.b 26,600.00
8 Paku GRC Kg - 36,700.00

G. BAHAN ATAP
1 Genteng Metal Type Classic 0.35 Lbr - 86,400.00
2 Seng Gelombang Bjls 20 Lbr - 66,000.00
3 Plat Datar Color 0.35 Lbr - 77,600.00

H. BAHAN KACA
1 Kaca Polos, t = 5 mm M² - 181,600.00
2 Kaca Polos, t = 12mm M² - 718,400.00
3 Sealent Kg - 111,650.00

I. BAHAN TRIPLEK
1 Triplek t = 3 mm Lbr - 82,300.00
2 Triplek t =9 mm Lbr - 211,500.00
3 Panel GRC 120 x 240 x 40 Lbr - 83,200.00

J. BAHAN SANITASI
1 Kloset duduk monoblok Bh - 2,232,500.00
2 Kloset jongkok (setaraf INA) Bh - 188,000.00
3 Kran air uk 1/2" (RRC) Bh - 44,700.00
4 Seal Tape Set - 3,200.00
5 Floor Drain Bh - 18,700.00

K. BAHAN MINYAK (TANPA KEUNTUNGAN)


1 Minyak solar Ltr M.183 8,900.00

L. BAHAN ALAT-ALAT LISTRIK


1 Saklar Double Buah - 22,000.00
2 Saklar Tunggal Buah - 17,200.00
3 Stop Kontak Buah - 15,000.00

Daftar Harga Satuan dan Upah - 141


REKAPITULASI
RENCANA ANGGARAN BIAYA

PROGRAM = #REF!
PEKERJAAN = #REF!
LOKASI = #REF!
SUMBER DANA = #REF!
THN ANGGARAN = #REF!

NO. URAIAN PEKERJAAN HARGA

I PEKERJAAN PERSIAPAN #REF!


II PEKERJAAN PONDASI #REF!
III PEKERJAAN STRUKTUR #REF!
IV PEKERJAAN LANTAI,DINDING,DAN PLAFOND #REF!
V PEKERJAAN PINTU, JENDELA,DAN VENTILASI #REF!
VI PEKERJAAN PENGUNCI DAN PENGGANTUNG #REF!
VII PEKERJAAN ATAP #REF!
VIII PEKERJAAN INSTALASI LISTRIK #REF!
IX PEKERJAAN TANGGA #REF!
X PEKERJAAN SANITASI #REF!
XI PEKERJAAN PENGECATAN #REF!
#REF! #REF! #REF!
#REF! #REF! #REF!

JUMLAH #REF!
Pajak Pertambahan Nilai ( PPN 10 %) #REF!
Total Biaya Termasuk PpN #REF!
DIBULATKAN #REF!

TERBILANG : SATU MILIAR LIMA RATUS EMPAT JUTA DELAPAN RATUS TUJUH BELAS RIBU RUPIAH

Anjongan, April 2015

Diketahui / Disetujui, Dibuat Oleh,


Kuasa Pengguna Anggaran Konsultan Perencana
UPTD - Balai Budidaya Ikan Sentral (BBIS) CV. ABSRI ANANTA KONSULTAN 
Provinsi Kalimantan Barat
 

DONATUS, S.Pi SOEROTO, ST


NIP. 19700404 199303 1 006 Team Leader