Anda di halaman 1dari 19

REKAPITULASI

PROGRAM
KEGIATAN
LOKASI

JUMLAH
NO URAIAN PEKERJAAN HARGA
(Rp)

A PEKERJAAN PENDAHULUAN 8,777,325.00


B PEKERJAAN TANAH 27,415,861.90
C PEKERJAAN PONDASI 154,442,239.11
D PEKERJAAN PASANGAN DAN PLESTERAN 284,732,705.97
E PEKERJAAN BETON 309,133,732.50
F PEKERJAAN PINTU DAN JENDELA 95,989,795.49
G PEKERJAAN KUDA-KUDA DAN ATAP 150,699,193.34
H PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND 82,325,437.78
I PEKERJAAN CAT-CATAN 49,955,204.52
J PEKERJAAN INSTALASI LISTRIK 25,592,760.00
K PEKERJAAN SANITASI 25,320,745.00
JUMLAH (A+B+C+D+E+F+G+H+I+J+K)= A Rp. 1,214,385,000.62
PPN ( 10 % x A ) = B Rp. 121,438,500.06
JUMLAH ( A + B ) = C Rp. 1,335,823,500.68

DIBULATKAN Rp 1,335,823,000.00
TERBILANG : ###
"SATU MILYAR TIGA RATUS TIGA PULUH LIMA JUTA DELAPAN RATUS DUA PULUH TIGA RIBU RUPIAH "

###
###
###
###
###

###
###
RENCANA ANGGARAN BIAYA
PROGRAM 0.00
KEGIATAN 0.00
LOKASI 0.00

HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN KODE SATUAN
Rp Rp
1 2 3 4 5 6

A PEKERJAAN PENDAHULUAN
1 Pembuatan Papan Nama Proyek 1.00 Ls - 500,000.00 500,000.00
2 Direksi Keet & Gudang 1.00 Ls - 4,000,000.00 4,000,000.00
3 Pemasangan Bowplank 79.95 M' A.1 53,500.00 4,277,325.00
Jumlah A 8,777,325.00
B PEKERJAAN TANAH
1 Galian Tanah Biasa 138.29 M3 B.1 41,200.00 5,697,342.00
2 Urugan Tanah Kembali 45.12 M3 B.2 19,750.00 891,120.00
3 Urugan Tanah dan Pemadatan Dalam Bangunan 108.49 M3 B.3 154,400.00 16,751,535.36
4 Urugan pasir bawah pondasi 9.22 M3 B.4 202,300.00 1,865,003.70
5 Urugan pasir bawah Lantai 10.93 M3 B.4 202,300.00 2,210,860.84
Jumlah B 27,415,861.90
C PEKERJAAN PONDASI
1 Tiang Pancang Dalam 2 m + Kalang & Sunduk 100.00 Titik C.1 216,450.00 21,645,000.00
2 Pasangan Batu Kosong (Aanstamping) 18.44 M3 C.3 766,545.00 14,133,556.71
3 Pasangan Batu Gunung 1 : 4 101.52 M3 C.2 1,168,870.00 118,663,682.40
Jumlah C 154,442,239.11
D PEKERJAAN PASANGAN DAN PLESTERAN
1 Pas. Dinding Bata 1/2 camp. 1Pc : 4Ps 484.57 M2 D.1 162,523.00 78,753,363.80
2 Plesteran Camp. 1 PC : 4 PS 994.83 M2 D.2 51,223.00 50,958,228.31
3 Acian 994.83 M2 D.3 46,723.00 46,481,488.81
4 Acian Slof f& Kolom 92.14 M2 D.3 46,723.00 4,305,057.22
5 Pas. Lantai Keramik 40/40 191.14 M2 J.1 245,576.20 46,939,312.08
6 Pas. Lantai Keramik 30/30 15.09 M2 J.2 240,101.20 3,623,247.16
7 Pas. Keramik Dinding KM/WC 20/25 33.90 M2 J.4 197,582.00 6,698,820.13
8 Pas. Lantai Keramik 20/20 19.80 M2 J.3 229,101.20 4,536,203.76
9 Pas. Batu Alam 15.42 M2 J.5 484,375.00 7,469,062.50
10 Pek. Saluran Parit 80.68 M' H.1 133,415.00 10,763,922.20
11 Pek. Pemasangan Grill Saluran 80.68 M' - 300,000.00 24,204,000.00
Jumlah D 284,732,705.97
E PEKERJAAN BETON
1 Cor Rabat Bawah Lantai Keramik 15.30 M3 F.1 1,215,870.00 18,602,902.19
2 Cor Rabat Selasar + Acian 5.56 M3 F.1 1,215,870.00 6,765,482.46
3 Cor Kolom Praktis k1 (13/13) 0.68 M3 F.9 9,932,408.02 6,714,307.82
4 Cor Kolom K2 ( 20x20 ) 5.12 M3 F.11 9,373,653.78 47,993,107.35
5 Cor Kolom K3 ( 30/30) 1.93 M3 F.12 5,603,142.46 10,791,652.37
6 Cor Sloof ( 20x30 ) Kg/M3 9.71 M3 F.13 5,457,474.02 52,981,157.76
7 Cor Sloof ( 30x30 ) 1.01 M3 F.14 4,336,161.99 4,390,364.01
8 Cor Dak Teras (12 Cm) Kg/M3 4.56 M3 F.17 11,934,440.85 54,424,630.59
9 Cor Ring Balok ( 20x30 ) Kg/M3 11.72 M3 F.15 6,581,410.68 77,128,868.09
10 Cor Ring Balok ( 20x20 ) 0.48 M3 F.16 7,588,547.06 3,648,573.43
11 Cor kanopi 1.67 M3 F.18 10,159,669.43 16,942,264.75
12 Cor Balok latei ( 13X13 ) 0.88 M3 F.10 9,932,408.02 8,750,421.67
Jumlah E 309,133,732.50
HARGA
JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN KODE SATUAN
Rp Rp
1 2 3 4 5 6
F PEKERJAAN PINTU DAN JENDELA
1 Pek. Kosen Pintu dan Jendela Bengkirai 2.31 M3 E.1 9,257,500.00 21,413,291.81
2 Daun Pintu Panil Bengkirai 22.46 M2 E.2 622,750.00 13,989,456.00
3 Daun Pintu Panil Ulin (WC) 6.53 M2 E.3 642,750.00 4,198,764.38
4 Daun Jendela Kaca Kayu Bengkirai 29.54 M2 E.4 604,522.50 17,859,105.96
5 Pas.Kaca 5 mm 19.79 M2 E.5 217,375.00 4,301,677.35
6 Kunci tanam 16.00 Buah I.1 357,800.00 5,724,800.00
7 Pas. Door Closer 14.00 Buah I.7 316,075.00 4,425,050.00
8 Pas. Door Stoper 14.00 Buah I.8 163,215.00 2,285,010.00
9 Pas. Door Holder 14.00 Buah I.9 416,075.00 5,825,050.00
10 Engsel pintu 63.00 Buah I.2 39,822.50 2,508,817.50
11 Engsel jendela 110.00 Buah I.3 28,215.00 3,103,650.00
12 Grendel jendela 114.00 Buah I.4 34,822.50 3,969,765.00
13 Handle jendela 57.00 Buah I.5 44,822.50 2,554,882.50
14 Kait/hak angin 110.00 Buah I.6 34,822.50 3,830,475.00
Jumlah F 95,989,795.49
G PEKERJAAN KUDA-KUDA DAN ATAP
1 Rangka Kap/Kuda-kuda Baja Ringan 418.69 M2 G.2 193,470.20 81,004,637.80
2 Pek. Penutup Atap (Setara Sakura) 418.69 M2 G.1 126,225.00 52,849,536.55
3 Bubungan Atap (Setara Sakura) 52.67 M' G.4 83,650.00 4,405,845.50
4 Pek. Lisplank 75.78 M' G.3 99,825.00 7,564,738.50
5 Pas. Talang Datar / Jurai 9.40 M' G.9 93,025.00 874,435.00
6 Pekerjaan Gewel 2.00 Bh - 2,000,000.00 4,000,000.00
Jumlah G 150,699,193.34
H PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND
1 Penutup Plafond Gypsum Board 9 mm (dalam) 231.08 M2 G.6 101,700.00 23,500,988.55
2 Penutup Plafond Calcyboard 3,5 mm (Luar) 55.84 M2 G.7 49,137.50 2,744,073.86
3 Pek. Rangka Plafond 286.93 M2 G.5 140,090.00 40,195,505.37
4 List Plafond 400.88 M' G.8 39,625.00 15,884,870.00
Jumlah H 82,325,437.78
I PEKERJAAN CAT-CATAN
1 Pek. Cat Kilap Kosen, Daun Pintu, Jendela & Boven 96.18 M2 K.1 49,735.00 4,783,512.30
2 Mengecat Dinding (Dalam) 524.09 M2 K.3 41,375.00 21,684,120.31
3 Mengecat Dinding (Luar) 264.15 M2 K.2 43,975.00 11,615,996.25
4 Mengecat Plafond 286.93 M2 K.3 41,375.00 11,871,575.66
Jumlah I 49,955,204.52
J PEKERJAAN INSTALASI LISTRIK
1 Lampu TL 2 x 40 Watt + accesories 17.00 Buah - 700,000.00 11,900,000.00
2 Lampu PL 18 Watt + accesories 6.00 Buah - 200,000.00 1,200,000.00
3 Saklar Doble 5.00 Buah - 150,000.00 750,000.00
4 Saklar Triple 9.00 Buah - 150,000.00 1,350,000.00
5 Stop Kontak 13.00 Buah - 150,000.00 1,950,000.00
6 Instalasi Listrik & Stop Kontak 36.00 Titik L.1 223,410.00 8,042,760.00
7 Box MCB 3 Group Lengkap 1.00 Unit - 400,000.00 400,000.00
Jumlah J 25,592,760.00
K PEKERJAAN SANITASI
1 Kran Air 3.00 Bh H.6 88,925.00 266,775.00
2 Kloset Jongkok 3.00 Bh H.2 609,890.00 1,829,670.00
3 Pasangan Bak Mandi keramik 3.00 Bh H.8 1,791,200.00 5,373,600.00
4 Floor drain 3.00 Bh H.7 73,800.00 221,400.00
5 Pipa PVC 3/4" 45.00 M' H.3 20,746.50 933,592.50
6 Pipa PVC 2" 35.00 M' H.4 51,187.50 1,791,562.50
7 Pipa PVC 4" 45.00 M' H.5 108,981.00 4,904,145.00
8 Septicktank 2.00 Unit - 4,000,000.00 8,000,000.00
9 Pek. Bak Kontrol 10.00 Bh - 200,000.00 2,000,000.00
Jumlah K 25,320,745.00
DAFTAR ANALISA HARGA SATUAN

PROGRAM 0.00
KEGIATAN 0.00
LOKASI 0.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
A PEKERJAAN PENDAHULUAN
A.1 1 M' Mengukur dan Memasang Bowplank
0.0100 M3 Kayu Meranti 5/7 3,000,000.00 30,000.00
0.0200 Kg Paku 20,000.00 400.00
0.0040 M3 Kayu Papan Meranti 2,800,000.00 11,200.00
0.0500 Oh Tukang 110,000.00 5,500.00
0.0100 Oh Kep. Tukang 125,000.00 1,250.00
0.0500 Oh Pekerja 90,000.00 4,500.00
0.0050 Oh Mandor 130,000.00 650.00
Jumlah 11,900.00 41,600.00 53,500.00
B. PEKERJAAN PASIR DAN TANAH
B.1 1 M3 Galian Tanah Biasa sedalam 1 m
0.4000 Oh Pekerja 90,000.00 36,000.00
0.0400 Oh Mandor 130,000.00 5,200.00
Jumlah 41,200.00 41,200.00
B.2 1 M3 Urugan Tanah Kembali
0.1920 Oh Pekerja 90,000.00 17,280.00
0.0190 Oh Mandor 130,000.00 2,470.00
Jumlah 19,750.00 19,750.00
B.3 1 M3 Urugan Tanah dan Pemadatan Dalam Bangunan
1.2000 M3 Tanah Urug 60,000.00 72,000.00
0.8000 Oh Pekerja 90,000.00 72,000.00
0.0800 Oh Mandor 130,000.00 10,400.00
Jumlah 82,400.00 72,000.00 154,400.00
B.4 1 M3 Urugan Pasir Bawah Lantai
1.2000 M3 Pasir Urug 145,000.00 174,000.00
0.3000 Oh Pekerja 90,000.00 27,000.00
0.0100 Oh Mandor 130,000.00 1,300.00
Jumlah 28,300.00 174,000.00 202,300.00
C PEKERJAAN PONDASI
C.1 1 Titik Tiang Pancang Kedalaman 2 M
0.0200 M3 Kayu Ulin 10/10 5,000,000.00 100,000.00
0.0030 m3 Kayu Ulin 5/10 5,000,000.00 15,000.00
0.0080 m3 Papan Ulin 2/20 6,000,000.00 48,000.00
0.2500 Oh Tukang 110,000.00 27,500.00
0.0250 Oh Kep. Tukang 125,000.00 3,125.00
0.2500 Oh Pekerja 90,000.00 22,500.00
0.0025 Oh Mandor 130,000.00 325.00
Jumlah 53,450.00 163,000.00 216,450.00
C.2 1 M3 Pasangan Batu Gunung 1 : 4
1.1000 M3 Batu Gunung 500,000.00 550,000.00
163.0000 Kg Semen 1,740.00 283,620.00
0.5200 M3 Pasir Pasang 225,000.00 117,000.00
0.6000 Oh Tukang 110,000.00 66,000.00
0.0600 Oh Kep. Tukang 125,000.00 7,500.00
1.5000 Oh Pekerja 90,000.00 135,000.00
0.0750 Oh Mandor 130,000.00 9,750.00
Jumlah 218,250.00 950,620.00 1,168,870.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
C.3 1 M3 Pasangan Aanstamping Batu Gunung
1.2000 M3 Batu Gunung 500,000.00 600,000.00
0.3000 M3 Pasir Urug 145,000.00 43,500.00
0.7800 Oh Pekerja 90,000.00 70,200.00
0.3900 Oh Tukang 110,000.00 42,900.00
0.0390 Oh Kep. Tukang 125,000.00 4,875.00
0.0390 Oh Mandor 130,000.00 5,070.00
Jumlah 123,045.00 643,500.00 766,545.00
D. PEKERJAAN DINDING DAN PLESTERAN
D.1 1 M2 Pasangan Batu Bata 1 : 2
60.0000 Bh Batu Bata 1,300.00 78,000.00
18.9500 Kg Semen 1,740.00 32,973.00
0.0380 M3 Pasir Pasang 225,000.00 8,550.00
0.1000 Oh Tukang 110,000.00 11,000.00
0.0100 Oh Kep. Tukang 125,000.00 1,250.00
0.3200 Oh Pekerja 90,000.00 28,800.00
0.0150 Oh Mandor 130,000.00 1,950.00
Jumlah 43,000.00 119,523.00 162,523.00
D.2 1 M2 Plesteran Tembok Tbl. 15 mm Camp. 1 : 4
5.2000 Kg Semen 1,740.00 9,048.00
0.0200 M3 Pasir Pasang 225,000.00 4,500.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.2000 Oh Pekerja 90,000.00 18,000.00
0.0100 Oh Mandor 130,000.00 1,300.00
Jumlah 37,675.00 13,548.00 51,223.00
D.3 1 M2 Acian
5.2000 Kg Semen 1,740.00 9,048.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.2000 Oh Pekerja 90,000.00 18,000.00
0.0100 Oh Mandor 130,000.00 1,300.00
Jumlah 37,675.00 9,048.00 46,723.00
E. PEKERJAAN KAYU
E.1 1 M3 Pasang Kusen Pintu dan Jendela
1.2000 M3 Kayu Bengkirai 5,500,000.00 6,600,000.00
18.0000 Oh Tukang 90,000.00 1,620,000.00
2.0000 Oh Kep. Tukang 110,000.00 220,000.00
6.0000 Oh Pekerja 130,000.00 780,000.00
0.3000 Oh Mandor 125,000.00 37,500.00
Jumlah 2,657,500.00 6,600,000.00 9,257,500.00
E.2 1 M2 Pasang Pintu Panil Kayu Bengkirai
0.0400 M3 Papan Bengkirai 5,500,000.00 220,000.00
2.5000 Oh Tukang 110,000.00 275,000.00
0.2500 Oh Kep. Tukang 125,000.00 31,250.00
1.0000 Oh Pekerja 90,000.00 90,000.00
0.0500 Oh Mandor 130,000.00 6,500.00
Jumlah 402,750.00 220,000.00 622,750.00
E.3 1 M2 Pasang Pintu Panil Kayu Ulin
0.0400 M3 Papan Ulin 6,000,000.00 240,000.00
2.5000 Oh Tukang 110,000.00 275,000.00
0.2500 Oh Kep. Tukang 125,000.00 31,250.00
1.0000 Oh Pekerja 90,000.00 90,000.00
0.0500 Oh Mandor 130,000.00 6,500.00
Jumlah 402,750.00 240,000.00 642,750.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
E.4 1 M2 Pasang Daun Jendela Kaca Kayu Bengkirai
0.0300 M3 Papan Bengkirai 5,500,000.00 165,000.00
0.7500 M2 Kaca Bening 5 mm 130,000.00 97,500.00
2.1500 Oh Tukang 110,000.00 236,500.00
0.2150 Oh Kep. Tukang 125,000.00 26,875.00
0.8150 Oh Pekerja 90,000.00 73,350.00
0.0408 Oh Mandor 130,000.00 5,297.50
Jumlah 342,022.50 262,500.00 604,522.50
E.5 1 M2 Pasang Jendela Kaca Mati
1.1000 M2 Kaca Bening 5 mm 130,000.00 143,000.00
0.3500 Oh Tukang 110,000.00 38,500.00
0.0350 Oh Kep. Tukang 125,000.00 4,375.00
0.3500 Oh Pekerja 90,000.00 31,500.00
Jumlah 74,375.00 143,000.00 217,375.00

F PEKERJAAN BETON
F.1 1 M3 Lantai Cor Rabat (camp 1 : 3 : 5)
0.8700 M3 Kerikil 540,000.00 469,800.00
0.5200 M3 Pasir Pasang 225,000.00 117,000.00
218.0000 Kg Semen 1,740.00 379,320.00
0.2500 Oh Tukang 90,000.00 22,500.00
0.0250 Oh Kep. Tukang 110,000.00 2,750.00
1.6500 Oh Pekerja 130,000.00 214,500.00
0.0800 Oh Mandor 125,000.00 10,000.00
Jumlah 249,750.00 966,120.00 1,215,870.00
F.2 1 M3 Cor Beton K-225
0.6500 M3 Kerikil 540,000.00 351,000.00
0.6500 M3 Pasir Pasang 225,000.00 146,250.00
388.0000 Kg Semen 1,740.00 675,120.00
1.0000 Oh Tukang 90,000.00 90,000.00
0.1000 Oh Kep. Tukang 110,000.00 11,000.00
6.0000 Oh Pekerja 130,000.00 780,000.00
0.3000 Oh Mandor 125,000.00 37,500.00
Jumlah 918,500.00 1,172,370.00 2,090,870.00
F.3 1 M2 Pasang Bekesting Untuk Pondasi
0.0400 M3 Kayu Bekisting 2,500,000.00 100,000.00
0.3000 Kg Paku Biasa 20,000.00 6,000.00
0.1000 Ltr Minyak Bekesting 5,000.00 500.00
0.2600 Oh Tukang 90,000.00 23,400.00
0.0260 Oh Kep. Tukang 110,000.00 2,860.00
0.3000 Oh Pekerja 130,000.00 39,000.00
0.0050 Oh Mandor 125,000.00 625.00
Jumlah 65,885.00 106,500.00 172,385.00
F.4 1 M2 Pasang Bekesting Untuk Sloof
0.0450 M3 Kayu Bekisting 2,500,000.00 112,500.00
0.3000 Kg Paku Biasa 20,000.00 6,000.00
0.1000 Ltr Minyak Bekesting 5,000.00 500.00
0.0260 Oh Tukang 90,000.00 2,340.00
0.0260 Oh Kep. Tukang 110,000.00 2,860.00
0.3000 Oh Pekerja 130,000.00 39,000.00
0.0050 Oh Mandor 125,000.00 625.00
Jumlah 44,825.00 119,000.00 163,825.00
F.5 1 M2 Pasang Bekesting Untuk Kolom
0.0400 M3 Kayu Bekisting 2,500,000.00 100,000.00
0.3000 Kg Paku Biasa 20,000.00 6,000.00
0.1000 Ltr Minyak Bekesting 5,000.00 500.00
0.3500 Lbr Plywood 9 mm 125,000.00 43,750.00
0.2600 Oh Tukang 90,000.00 23,400.00
0.0260 Oh Kep. Tukang 110,000.00 2,860.00
0.5200 Oh Pekerja 130,000.00 67,600.00
0.0260 Oh Mandor 125,000.00 3,250.00
Jumlah 97,110.00 150,250.00 247,360.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
F.6 1 M2 Pasang Bekesting Untuk Balok
0.0400 M3 Kayu Bekisting 2,500,000.00 100,000.00
0.3000 Kg Paku Biasa 20,000.00 6,000.00
0.1000 Ltr Minyak Bekesting 5,000.00 500.00
0.3500 Lbr Plywood 9 mm 125,000.00 43,750.00
0.2600 Oh Tukang 90,000.00 23,400.00
0.0260 Oh Kep. Tukang 110,000.00 2,860.00
0.5200 Oh Pekerja 130,000.00 67,600.00
0.0260 Oh Mandor 125,000.00 3,250.00
Jumlah 97,110.00 150,250.00 247,360.00
F.7 1 M2 Pasang Bekesting Untuk Lantai
0.1750 M3 Kayu Bekisting 2,500,000.00 437,500.00
0.4000 Kg Paku Biasa 20,000.00 8,000.00
0.2000 Ltr Minyak Bekesting 5,000.00 1,000.00
0.3500 Lbr Plywood 9 mm 125,000.00 43,750.00
0.3300 Oh Tukang 90,000.00 29,700.00
0.0330 Oh Kep. Tukang 110,000.00 3,630.00
0.3200 Oh Pekerja 130,000.00 41,600.00
0.0060 Oh Mandor 125,000.00 750.00
Jumlah 75,680.00 490,250.00 565,930.00
F.8 1 Kg Pembesian Dengan Besi Polos/Ulir
1.0500 Kg Besi Beton Ulir 13,500.00 14,175.00
0.0150 Kg Kawat Beton 18,000.00 270.00
0.0070 Oh Tukang 90,000.00 630.00
0.0007 Oh Kep. Tukang 110,000.00 77.00
0.0070 Oh Pekerja 130,000.00 910.00
0.0003 Oh Mandor 125,000.00 37.50
Jumlah 1,654.50 14,445.00 16,099.50
F.9 1 M3 Cor Kolom Praktis ( 13X13 )
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
15.3846 M2 Bekesting Untuk Kolom 247,360.00 3,805,538.46
250.6910 Kg Besi Beton 16,099.50 4,035,999.56
Jumlah 9,932,408.02
F.10 1 M3 Cor Balok latei ( 13X13 )
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
15.3846 M2 Bekesting Untuk Kolom 247,360.00 3,805,538.46
250.6910 Kg Besi Beton 16,099.50 4,035,999.56
Jumlah 9,932,408.02
F.11 1 M3 Cor Kolom ( 20X20 )
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
20.0000 M2 Bekesting Untuk Kolom 247,360.00 4,947,200.00
145.0718 Kg Besi Beton 16,099.50 2,335,583.78
Jumlah 9,373,653.78
F.12 1 M3 Cor Kolom ( 30X30 )
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
10.0000 M2 Bekesting Untuk Kolom 247,360.00 2,473,600.00
64.5158 Kg Besi Beton 16,099.50 1,038,672.46
Jumlah 5,603,142.46
F.13 1 M3 Cor Sloof (20X30)
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
10.0000 M2 Bekesting Untuk Sloof 163,825.00 1,638,250.00
107.3545 Kg Besi Beton 16,099.50 1,728,354.02
Jumlah 5,457,474.02
F.14 1 M3 Cor Sloof (30X30)
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
6.6667 M2 Bekesting Untuk Sloof 163,825.00 1,092,166.67
71.6249 Kg Besi Beton 16,099.50 1,153,125.32
Jumlah 4,336,161.99
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
F.15 1 M3 Cor Ring Balok (20X30)
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
11.1667 M2 Bekesting Untuk Balok 247,360.00 2,762,186.67
107.3545 Kg Besi Beton 16,099.50 1,728,354.02
Jumlah 6,581,410.68
F.16 1 M3 Cor Ring Balok (20X20)
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
11.7500 M2 Bekesting Untuk Balok 247,360.00 2,906,480.00
160.9489 Kg Besi Beton 16,099.50 2,591,197.06
Jumlah 7,588,547.06
F.17 1 M3 Cor Dak
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
11.3100 M2 Bekesting Untuk Plat Lantai 565,930.00 6,400,668.30
213.8515 Kg Besi Beton 16,099.50 3,442,902.55
Jumlah 11,934,440.85
F.18 1 M3 Cor kanopi
1.0000 M3 Beton K-225 2,090,870.00 2,090,870.00
11.3100 M2 Bekesting Untuk Plat Lantai 565,930.00 6,400,668.30
103.6138 Kg Besi Beton 16,099.50 1,668,131.13
Jumlah 10,159,669.43
G PEKERJAAN ATAP DAN PLAFOND
G.1 1M2 Mengerjakan Atap Genteng Metal Setara Sakura Roof
1.3000 Lbr Atap Genteng Metal 65,000.00 84,500.00
0.2000 Kg Paku Seng 27,500.00 5,500.00
0.1000 Oh Tukang 90,000.00 9,000.00
0.0100 Oh Kep. Tukang 110,000.00 1,100.00
0.2000 Oh Pekerja 130,000.00 26,000.00
0.0010 Oh Mandor 125,000.00 125.00
Jumlah 36,225.00 90,000.00 126,225.00
G.2 Rangka Kap/Kuda-kuda Baja Ringan
1.440 M¹ Canal C75.75 25,000.00 36,000.00
3.650 M¹ Reng (Type U) 0,4 TCT 20,000.00 73,000.00
47.600 Pcs Screw 12 - 14 x 20 150.00 7,140.00
40.040 Pcs Screw 10 - 16 x 16 130.00 5,205.20
1.520 Pcs L - Braket 350.00 532.00
1.840 Pcs Dynabolt 200.00 368.00
0.500 OH Pekerja 130,000.00 65,000.00
0.050 OH Tukang Atap 90,000.00 4,500.00
0.010 OH Kepala Tukang 110,000.00 1,100.00
0.005 OH Mandor 125,000.00 625.00
Jumlah 71,225.00 122,245.20 193,470.20
G.3 1 M¹ MEMASANG LIST PLANK UK (3 X 20) CM
1.100 M¹ Papan Grc Tebal 4 mm 55,000.00 60,500.00
0.250 Dus Skrup 22,000.00 5,500.00
0.100 OH Pekerja 130,000.00 13,000.00
0.200 OH Tukang Atap 90,000.00 18,000.00
0.020 OH Kepala Tukang 110,000.00 2,200.00
0.005 OH Mandor 125,000.00 625.00
Jumlah 33,825.00 66,000.00 99,825.00

G.4 1 M' Bubungan Atap Sakura Roof


HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
1.1000 Bh Bubungan Atap Genteng 30,000.00 33,000.00
0.0500 Kg Paku Seng 27,500.00 1,375.00
0.1500 Oh Tukang 90,000.00 13,500.00
0.0150 Oh Kep. Tukang 110,000.00 1,650.00
0.2500 Oh Pekerja 130,000.00 32,500.00
0.0130 Oh Mandor 125,000.00 1,625.00

Jumlah 49,275.00 34,375.00 83,650.00


G.5 1 M2 Rangka Plafond Hollow
3.000 M1 Besi Hollow 4/4 30,000.00 90,000.00
0.120 Kg Sekrup 22,000.00 2,640.00
0.200 OH Pekerja 130,000.00 26,000.00
0.200 OH Tukang kayu 90,000.00 18,000.00
0.020 OH Kepala Tukang 110,000.00 2,200.00
0.010 OH Mandor 125,000.00 1,250.00
Jumlah 47,450.00 92,640.00 140,090.00
G.6 1 M2 Plafond Gypsum Board 9 mm
0.5000 Lbr Gypsum Board 9 mm 160,000.00 80,000.00
0.1100 Kg Paku Sekrup 27,500.00 3,025.00
0.0500 Oh Tukang 90,000.00 4,500.00
0.0050 Oh Kep. tukang 110,000.00 550.00
0.1000 Oh Pekerja 130,000.00 13,000.00
0.0050 Oh Mandor 125,000.00 625.00
Jumlah 18,675.00 83,025.00 101,700.00
G.7 1 M2 Plafond Kalsi Board 3,5 mm
0.3640 Lbr Kalsi Board 6 mm 75,000.00 27,300.00
0.1100 Kg Paku Sekrup 20,000.00 2,200.00
0.1000 Oh Tukang 90,000.00 9,000.00
0.0100 Oh Kep. tukang 110,000.00 1,100.00
0.0700 Oh Pekerja 130,000.00 9,100.00
0.0035 Oh Mandor 125,000.00 437.50
Jumlah 19,637.50 29,500.00 49,137.50
G.8 1 M' List Plafond
1.1000 M' List Profil Gypsum 7/7 25,000.00 27,500.00
0.0100 Kg Paku biasa 20,000.00 200.00
0.0500 Oh Tukang 90,000.00 4,500.00
0.0050 Oh Kep. tukang 110,000.00 550.00
0.0500 Oh Pekerja 130,000.00 6,500.00
0.0030 Oh Mandor 125,000.00 375.00
Jumlah 11,925.00 27,700.00 39,625.00
G.9 1 M¹ TALANG DATAR/JURAI SENG BJLS 28 LEBAR 45 CM
1.050 M¹ Seng Plat 20,500.00 21,525.00
0.250 Dus Skrup 22,000.00 5,500.00
0.200 OH Pekerja 130,000.00 26,000.00
0.400 OH Tukang 90,000.00 36,000.00
0.025 OH Kep. tukang 110,000.00 2,750.00
0.010 OH Mandor 125,000.00 1,250.00
Jumlah 66,000.00 27,025.00 93,025.00

H. PEKERJAAN SANITASI
H.1 1 M' Parit Pas. Batu Bata Camp. 1 : 4
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
30.0000 Bh Batu Bata 1,300.00 39,000.00
6.0000 Kg Semen 1,740.00 10,440.00
0.1200 M3 Pasir Pasang 225,000.00 27,000.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.4000 Oh Pekerja 90,000.00 36,000.00
0.0200 Oh Mandor 130,000.00 2,600.00
Jumlah 56,975.00 76,440.00 133,415.00
H.2 1 Bh Pasang Kloset Jongkok
1.0000 Bh Kloset Jongkok 280,000.00 280,000.00
8.0000 Bh Batu Bata 1,300.00 10,400.00
6.0000 Kg Semen 1,740.00 10,440.00
0.0100 M3 Pasir Pasang 225,000.00 2,250.00
1.5000 Oh Tukang 110,000.00 165,000.00
0.3000 Oh Kep. Tukang 125,000.00 37,500.00
1.0000 Oh Pekerja 90,000.00 90,000.00
0.1100 Oh Mandor 130,000.00 14,300.00
Jumlah 306,800.00 303,090.00 609,890.00
H.3 1 M' Pasang Pipa PVC Dia 3/4"
1.2000 Bh Pipa PVC 3/4" 6,125.00 7,350.00
35.0% Hrg Pipa Perlengkapan 7,350.00 2,572.50
0.0600 Oh Tukang 110,000.00 6,600.00
0.0060 Oh Kep. Tukang 125,000.00 750.00
0.0360 Oh Pekerja 90,000.00 3,240.00
0.0018 Oh Mandor 130,000.00 234.00
Jumlah 10,824.00 9,922.50 20,746.50
H.4 1 M' Pasang Pipa PVC Dia 2"
1.2000 Bh Pipa PVC 2" 21,575.00 25,890.00
35.0% Hrg Pipa Perlengkapan 25,890.00 9,061.50
0.0900 Oh Tukang 110,000.00 9,900.00
0.0090 Oh Kep. Tukang 125,000.00 1,125.00
0.0540 Oh Pekerja 90,000.00 4,860.00
0.0027 Oh Mandor 130,000.00 351.00
Jumlah 16,236.00 34,951.50 51,187.50
H.5 1 M' Pasang Pipa PVC Dia 4"
1.2000 Bh Pipa PVC 4" 57,250.00 68,700.00
35.0% Hrg Pipa Perlengkapan 68,700.00 24,045.00
0.0900 Oh Tukang 110,000.00 9,900.00
0.0090 Oh Kep. Tukang 125,000.00 1,125.00
0.0540 Oh Pekerja 90,000.00 4,860.00
0.0027 Oh Mandor 130,000.00 351.00
Jumlah 16,236.00 92,745.00 108,981.00
H.6 Memasang 1 Buah Kran Air
1.000 Bh Kran 75,000.00 75,000.00
0.025 Bh Seal Tape 5,000.00 125.00
0.100 Oh Tukang Batu 110,000.00 11,000.00
0.010 Oh Kepala Tukang 125,000.00 1,250.00
0.010 Oh Pekerja 90,000.00 900.00
0.005 Oh Mandor 130,000.00 650.00
Jumlah 13,800.00 75,125.00 88,925.00

H.7 Memasang 1 Buah Floor Drain


1.000 Bh Floor Drain 60,000.00 60,000.00
0.100 Oh Tukang Batu 110,000.00 11,000.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.010 Oh Kepala Tukang 125,000.00 1,250.00
0.010 Oh Pekerja 90,000.00 900.00
0.005 Oh Mandor 130,000.00 650.00
Jumlah 13,800.00 60,000.00 73,800.00
H.8 Memasang 1 Buah Bak Mandi Batu Bata Volume 0,3 M3 ( 60 x 60)
110.0000 Bh Batu Bata 1,300.00 143,000.00
120.0000 Kg Semen 1,740.00 208,800.00
0.3000 M3 Pasir Pasang 225,000.00 67,500.00
4.5600 M2 Keramik 20 x 25(Dinding) 90,000.00 410,400.00
6.0000 Kg Semen Warna 2,500.00 15,000.00
6.0000 Oh Pekerja 90,000.00 540,000.00
3.0000 Oh Tukang 110,000.00 330,000.00
0.3000 Oh Kepala Tukang 125,000.00 37,500.00
0.3000 Oh Mandor 130,000.00 39,000.00
Jumlah 946,500.00 844,700.00 1,791,200.00
I. PEKERJAAN KUNCI DAN PENGGANTUNG
I.1 1 Bh Pasang Kunci Tanam
1.0000 Bh Kunci Tanam (Setara Gravel) 300,000.00 300,000.00
0.5000 Oh Tukang 110,000.00 55,000.00
0.0100 Oh Kep. Tukang 125,000.00 1,250.00
0.0100 Oh Pekerja 90,000.00 900.00
0.0050 Oh Mandor 130,000.00 650.00
Jumlah 57,800.00 300,000.00 357,800.00
I.2 1 Bh Pasang Engsel Pintu
1.0000 Bh Engsel Pintu 20,000.00 20,000.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.0150 Oh Pekerja 90,000.00 1,350.00
0.0008 Oh Mandor 130,000.00 97.50
Jumlah 19,822.50 20,000.00 39,822.50
I.3 1 Bh Pasang Engsel Jendela
1.0000 Bh Engsel Jendela 15,000.00 15,000.00
0.1000 Oh Tukang 110,000.00 11,000.00
0.0100 Oh Kep. Tukang 125,000.00 1,250.00
0.0100 Oh Pekerja 90,000.00 900.00
0.0005 Oh Mandor 130,000.00 65.00
Jumlah 13,215.00 15,000.00 28,215.00
I.4 1 Bh Pasang Grendel Jendela
1.0000 Bh Grendel Jendela 15,000.00 15,000.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.0150 Oh Pekerja 90,000.00 1,350.00
0.0008 Oh Mandor 130,000.00 97.50
Jumlah 19,822.50 15,000.00 34,822.50
I.5 1 Bh Pasang Handle Jendela
1.0000 Bh Handle Jendela 25,000.00 25,000.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
0.0150 Oh Pekerja 90,000.00 1,350.00
0.0008 Oh Mandor 130,000.00 97.50
Jumlah 19,822.50 25,000.00 44,822.50
I.6 1 Bh Pasang Hak Angin
1.0000 Bh Hak Angin 15,000.00 15,000.00
0.1500 Oh Tukang 110,000.00 16,500.00
0.0150 Oh Kep. Tukang 125,000.00 1,875.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.0150 Oh Pekerja 90,000.00 1,350.00
0.0008 Oh Mandor 130,000.00 97.50
Jumlah 19,822.50 15,000.00 34,822.50
I.7 1 Psg PEK. DOOR CLOSER
1.00 Psg Door Closer 250,000.00 250,000.00
0.050 OH Pekerja 90,000.00 4,500.00
0.500 OH Tukang Kayu 110,000.00 55,000.00
0.050 OH Kepala Tukang 125,000.00 6,250.00
0.003 OH Mandor 130,000.00 325.00
Jumlah 66,075.00 250,000.00 316,075.00
I.8 1 Psg PEK. DOOR STOP
1.00 Psg Door Stop 150,000.00 150,000.00
0.010 OH Pekerja 90,000.00 900.00
0.100 OH Tukang Kayu 110,000.00 11,000.00
0.010 OH Kepala Tukang 125,000.00 1,250.00
0.001 OH Mandor 130,000.00 65.00
Jumlah 13,215.00 150,000.00 163,215.00
I.9 1 Psg PEK. PEGANGAN PINTU/DOOR HOLDER
1.00 Psg Door Holder 350,000.00 350,000.00
0.050 OH Pekerja 90,000.00 4,500.00
0.500 OH Tukang Kayu 110,000.00 55,000.00
0.050 OH Kepala Tukang 125,000.00 6,250.00
0.003 OH Mandor 130,000.00 325.00
Jumlah 66,075.00 350,000.00 416,075.00
J. PEKERJAAN KERAMIK LANTAI & DINDING
J.1 1 M2 Pasangan Lantai Keramik 40/40
1.1000 m2 Keramik 40/40 100,000.00 110,000.00
11.3800 kG Semen 1,740.00 19,801.20
0.0420 m3 Pasir pasang 225,000.00 9,450.00
1.5000 kG Semen Warna 2,500.00 3,750.00
0.6200 Oh Pekerja 90,000.00 55,800.00
0.3500 Oh Tukang 110,000.00 38,500.00
0.0350 Oh Kepala Tukang 125,000.00 4,375.00
0.0300 Oh Mandor 130,000.00 3,900.00
Jumlah 102,575.00 143,001.20 245,576.20
J.2 1 M2 Pasangan Lantai Keramik 30/30
1.1000 m2 Keramik 30/30 95,000.00 104,500.00
11.3800 kG Semen 1,740.00 19,801.20
0.0420 m3 Pasir pasang 225,000.00 9,450.00
1.5000 kG Semen Warna 2,500.00 3,750.00
0.6200 Oh Pekerja 90,000.00 55,800.00
0.3500 Oh Tukang 110,000.00 38,500.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.0300 Oh Mandor 125,000.00 3,750.00
Jumlah 102,600.00 137,501.20 240,101.20

J.3 1 M2 Pasangan Lantai Keramik 20/20


1.1000 m2 Keramik 85,000.00 93,500.00
11.3800 kG Semen 1,740.00 19,801.20
0.0420 m3 Pasir pasang 225,000.00 9,450.00
1.5000 kG Semen Warna 2,500.00 3,750.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
0.6200 Oh Pekerja 90,000.00 55,800.00
0.3500 Oh Tukang 110,000.00 38,500.00
0.0350 Oh Kepala Tukang 130,000.00 4,550.00
0.0300 Oh Mandor 125,000.00 3,750.00
Jumlah 102,600.00 126,501.20 229,101.20
J.4 1 M2 Pasangan Dinding Keramik 20/25
1.1000 m2 Keramik 90,000.00 99,000.00
9.3000 kG Semen 1,740.00 16,182.00
1.5000 m3 Semen Warna 2,500.00 3,750.00
0.0180 kG Pasir Pasang 225,000.00 4,050.00
0.6000 Oh Pekerja 90,000.00 54,000.00
0.1000 Oh Tukang 110,000.00 11,000.00
0.0450 Oh Kepala Tukang 130,000.00 5,850.00
0.0300 Oh Mandor 125,000.00 3,750.00
Jumlah 74,600.00 122,982.00 197,582.00
J.5 1 M2 Pasangan Batu Alam
1.0000 M2 Batu Alam (Sisir) 350,000.00 350,000.00
11.5000 Kg Semen 1,740.00 20,010.00
0.0430 M3 Pasir Pasang 225,000.00 9,675.00
0.4000 Oh Tukang 110,000.00 44,000.00
0.0400 Oh Kep. Tukang 125,000.00 5,000.00
0.6000 Oh Pekerja 90,000.00 54,000.00
0.0130 Oh Mandor 130,000.00 1,690.00
Jumlah 104,690.00 379,685.00 484,375.00
K. PEKERJAAN CAT-CATAN
K.1 1 M2 Mengecat Bidang Kayu Baru ( 1 x cat dasar, 2 x cat penutup )
0.2600 Kg Cat Kilap/Kayu (setara dulux V-gloss) 40,000.00 10,400.00
0.1500 Kg Plamir 28,000.00 4,200.00
0.2000 Ltr Thiner A 28,000.00 5,600.00
0.1700 Kg Cat Dasar (Meni Kayu) 28,000.00 4,760.00
0.1500 Oh Tukang 90,000.00 13,500.00
0.0150 Oh Kep. Tukang 110,000.00 1,650.00
0.0500 Oh Pekerja 130,000.00 6,500.00
0.0250 Oh Mandor 125,000.00 3,125.00
Jumlah 24,775.00 24,960.00 49,735.00
HARGA BIAYA BIAYA JUMLAH
KODE URAIAN PEKERJAAN SATUAN UPAH BAHAN HARGA
ANALISA (Rp) (Rp) (Rp) (Rp)
1 2 3 4 5 6
K.2 1 M2 Pengecatan tembok baru ( 1 x plamir, 1 x cat dasar & 2 x Cat Penutup ) Luar
0.2600 Kg Cat tembok exterior (setara mowilex weather 50,000.00 13,000.00
0.1000 Kg Plamir Tembok 22,000.00 2,200.00
0.1000 Kg Cat dasar tembok (setara mowilex undercoa 40,000.00 4,000.00
0.1500 Oh Tukang 90,000.00 13,500.00
0.0150 Oh Kep. Tukang 110,000.00 1,650.00
0.0500 Oh Pekerja 130,000.00 6,500.00
0.0250 Oh Mandor 125,000.00 3,125.00
Jumlah 24,775.00 19,200.00 43,975.00
K.3 1 M2 Pengecatan tembok baru ( 1 x plamir, 1 x cat dasar & 2 x Cat Penutup ) Dalam
0.2600 Kg Cat tembok Interior (Setara mowilex emulsio 40,000.00 10,400.00
0.1000 Kg Plamir Tembok 22,000.00 2,200.00
0.1000 Kg Cat dasar tembok (setara mowilex undercoa 40,000.00 4,000.00
0.1500 Oh Tukang 90,000.00 13,500.00
0.0150 Oh Kep. Tukang 110,000.00 1,650.00
0.0500 Oh Pekerja 130,000.00 6,500.00
0.0250 Oh Mandor 125,000.00 3,125.00
Jumlah 24,775.00 16,600.00 41,375.00
l. PEKERJAAN INSTALASI LISTRIK
L.1 1 Titik Instalasi Listrik
0.1700 Rool Instalasi Kabel NYM 2,5 mm 700,000.00 119,000.00
2.0000 Bh T Dos 15,000.00 30,000.00
2.0000 Btng Pipa Conduit 25,000.00 50,000.00
0.0810 Oh Pekerja 90,000.00 7,290.00
0.1350 Oh Tukang 110,000.00 14,850.00
0.0140 Oh Kepala Tukang 125,000.00 1,750.00
0.0040 Oh Mandor 130,000.00 520.00
Jumlah 24,410.00 199,000.00 223,410.00
DAFTAR BAHAN DAN UPAH

PROGRAM 0.00
KEGIATA 0.00
LOKASI 0.00
HARGA SATUAN
NO JENIS BAHAN SATUAN BAHAN KETERANGAN
( Rp )
A. AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA
1 Tanah urug m3 60,000.00 DIPROYEK
2 Pasir urug m3 145,000.00 DIPROYEK
3 Pasir pasang (Tenggarong) m3 225,000.00 DIPROYEK
5 Batu kerikil / koral (Palu) m3 540,000.00 DIPROYEK
6 Batu gunung m3 500,000.00 DIPROYEK
7 Batu bata merah Bh 1,300.00 DIPROYEK
8 Batu alam (Sisir) M2 350,000.00 DIPROYEK
9 Semen Warna Kg 2,500.00 DIPROYEK
10 Semen Kg 1,740.00 DIPROYEK
B. BAHAN FINISHING
1 Meni kayu kg 28,000.00 DIPROYEK
2 Cat tembok Interior (Setara mowilex emulsion) kg 40,000.00 DIPROYEK
3 Cat tembok exterior (setara mowilex weathercoat) kg 50,000.00 DIPROYEK
4 Cat dasar tembok (setara mowilex undercoat) kg 40,000.00 DIPROYEK
5 Cat kayu/minyak (Setara Dulux) kg 40,000.00 DIPROYEK
7 Thiner A spesial (setara avian) kg 28,000.00 DIPROYEK
9 Plamur tembok kg 22,000.00 DIPROYEK
10 Plamur kayu kg 28,000.00 DIPROYEK
11 Minyak Bekesting Ltr 5,000.00 DIPROYEK
13 Dempul kg 28,000.00 DIPROYEK
14 Kuas Bh 9,000.00 DIPROYEK
C. BAHAN KAYU BERIKUT BAHAN JADINYA
1 Papan Meranti m3 2,800,000.00 DIPROYEK
2 Balok Meranti m3 3,000,000.00 DIPROYEK
3 Kayu Bekisting m3 2,500,000.00 DIPROYEK
4 Balok Bengkirai (Kosen) m3 5,500,000.00 DIPROYEK
5 Balok Ulin 10/10 m3 5,000,000.00 DIPROYEK
6 Balok Ulin 5/10 m3 5,000,000.00 DIPROYEK
7 Balok Ulin 5/7 m3 5,000,000.00 DIPROYEK
8 Balok Ulin 8/8 m3 5,000,000.00 DIPROYEK
9 Papan Ulin 2/20 m3 6,000,000.00 DIPROYEK
10 Plywood ukuran 9 mm lembar 125,000.00 DIPROYEK
11 Gypsum Board 9 mm lembar 160,000.00 DIPROYEK
12 Kalsi Board 3,5 mm lembar 75,000.00 DIPROYEK
13 Papan Grc Tebal 4 mm M1 55,000.00 DIPROYEK
14 List Profil Gypsum M' 25,000.00 DIPROYEK
D BAHAN LANTAI DAN PELAPIS DINDING
1 Tegel Keramik 40 x 40 cm M2 100,000.00 DIPROYEK
2 Tegel Keramik 30 x 30 cm M2 95,000.00 DIPROYEK
3 Tegel keramik 20 x 20 cm M2 85,000.00 DIPROYEK
4 Tegel keramik 20 x 25 cm M2 90,000.00 DIPROYEK
E BAHAN LOGAM, PAKU DAN KACA
1 Paku segala ukuran kg 20,000.00 DIPROYEK
2 Paku seng kg 27,500.00 DIPROYEK
3 Paku Skrup Kg 22,000.00 DIPROYEK
4 Paku kecil plywood kg 27,500.00 DIPROYEK
5 Kawat ikat kg 18,000.00 DIPROYEK
6 Besi beton kg 13,500.00 DIPROYEK
7 Kaca Bening 5 mm M2 130,000.00 DIPROYEK
8 Besi Grill M' 200,000.00 DIPROYEK
9 Canal C75.75 Btg 25,000.00 DIPROYEK
10 Reng (Type U) 0,4 TCT Btg 20,000.00 DIPROYEK
11 Screw 12 - 14 x 20 Bh 150.00 DIPROYEK
12 Screw 10 - 16 x 16 Bh 130.00 DIPROYEK
13 L - Braket BH 350.00 DIPROYEK
14 Dynabolt Bh 200.00 DIPROYEK
15 Seng Bjls Lbr 20,500.00 DIPROYEK
16 Hollow 4/4 M1 30,000.00 DIPROYEK
HARGA SATUAN
NO JENIS BAHAN SATUAN BAHAN KETERANGAN
( Rp )

F BAHAN PENUTUP ATAP


1 Genteng Metal Ex Sakura Bh 65,000.00 DIPROYEK
2 Bubungan atap bh 30,000.00 DIPROYEK
G BAHAN ELEKTRIKAL
1 Kabel NYM 2,5 mm Roll 700,000.00 DIPROYEK
2 T Dos Bh 15,000.00 DIPROYEK
3 Pipa Conduit Btg 25,000.00 DIPROYEK
4 Lampu TL 2 x 40 Watt + accesories bh 700,000.00 TERPASANG
5 Lampu PL 18 Watt + accesories bh 200,000.00 TERPASANG
6 Saklar double bh 150,000.00 TERPASANG
7 Saklar Tripel bh 150,000.00 DIPROYEK
8 Stop kontak bh 150,000.00 TERPASANG
H BAHAN PENGGANTUNG DAN KUNCI
1 Kunci tanam 2 slagh (Setara Gravel) bh 300,000.00 DIPROYEK
2 Engsel pintu 4" bh 20,000.00 DIPROYEK
3 Engsel jendela 3" bh 15,000.00 DIPROYEK
4 Grendel jendela bh 15,000.00 DIPROYEK
5 Handle jendela bh 25,000.00 DIPROYEK
6 Kait/hak angin bh 15,000.00 DIPROYEK
7 Door Closer Psg 250,000.00 DIPROYEK
8 Door Stop Psg 150,000.00 DIPROYEK
9 Door Holder Psg 350,000.00 DIPROYEK
I BAHAN SANITASI DAN PERPIPAAN
1 Kloset jongkok Bh 280,000.00 DIPROYEK
2 Kran Air Bh 75,000.00 DIPROYEK
3 Floor Drain Bh 60,000.00 DIPROYEK
4 Pipa PVC AW Dia 4" M' 57,250.00 DIPROYEK
5 Pipa PVC AW Dia 2" M' 21,575.00 DIPROYEK
6 Pipa PVC AW Dia 3/4" M' 6,125.00 DIPROYEK
HARGA SATUAN
NO JENIS UPAH SATUAN UPAH KETERANGAN
( Rp )

1 Pekerja biasa Hari 90,000.00 PERORANG


2 Mandor Hari 130,000.00 PERORANG
3 Tukang Hari 110,000.00 PERORANG
4 Kepala Tukang Hari 125,000.00 PERORANG
TIME SCHEDULE

PROGRAM 0.00
KEGIATAN 0.00
LOKASI 0.00

WAKTU PELAKSANAAN 120 HARI


TOTAL HARGA BOBOT
NO URAIAN PEKERJAAN BULAN I BULAN II BULAN III BULAN IV KET
( Rp ) % 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

100 %
A PEKERJAAN PENDAHULUAN 8,777,325.00 0.72 0.72 ###
B PEKERJAAN TANAH 27,415,861.90 2.26 0.45 0.45 0.45 0.45 0.45 ###
C PEKERJAAN PONDASI 154,442,239.11 12.72 3.18 3.18 3.18 3.18 75 % ###

D PEKERJAAN PASANGAN DAN PLESTERAN 284,732,705.97 23.45 3.91 3.91 3.91 3.91 3.91 3.91 ###
E PEKERJAAN BETON 309,133,732.50 25.46 6.36 6.36 6.36 6.36 ###
F PEKERJAAN PINTU DAN JENDELA 95,989,795.49 7.90 2.63 2.63 2.63 50 % ###
G PEKERJAAN KUDA-KUDA DAN ATAP 150,699,193.34 12.41 6.20 6.20 ###
H PEKERJAAN RANGKA PLAFOND DAN PENUTUP PLAFOND 82,325,437.78 6.78 4.07 1.36 1.36 ###
I PEKERJAAN CAT-CATAN 49,955,204.52 4.11 1.37 1.37 1.37 25 % ###

J PEKERJAAN INSTALASI LISTRIK 25,592,760.00 2.11 1.05 1.05 ###


K PEKERJAAN SANITASI 25,320,745.00 2.09 0.70 0.70 0.70 0% ###
JUMLAH 1,214,385,000.62 100.00
TIAP MINGGU 0.72 3.63 3.63 3.63 3.63 0.45 6.36 10.27 12.91 20.17 13.44 4.76 2.05 2.73 6.33 5.28
RENCANA
KOMULATIF TIAP MINGGU 0.00 0.72 4.35 7.98 11.62 15.25 15.70 22.06 32.33 45.24 65.41 78.85 83.61 85.66 88.39 94.72 100.00

0.00
Di buat Oleh :
0.00
0.00

0.00
Direktur
SPESIFIKASI TEKNIS
PENINGKATAN SARANA DAN PRASARANA APARATUR
(PEMBANGUNAN KANTOR DESA SUMBER SARI)
LOKASI : KECAMATAN KOTA BANGUN

NO URAIAN PEKERJAAN SPESIFIKASI TEKNIK MERK PRODUK

1 Pancang Pondasi Pancang Ulin 10x10 mutu A Standard PPKI

2 Beton Mutu Beton K-225 untuk struktur bangunan Standar PBI

3 Rangka Plafond Besi Holow Standard PPKI

4 Kusen + Daun Pintu dan Jendela Kusen Kayu Bengkirai/Ulin mutu A Standard PPKI
Daun Pintu/Jendela Kayu Bengkirai/Ulin mutStandard PPKI

5 Plafond Gypsum Board tebal 9 mm (dalam) ex Jaya Board


Calcyboard 3,5 mm (Luar) ex Jaya Board

6 Keramik Keramik lantai 40x40 ex Roman


Keramik Lantai 30x30 ex Roman
Keramik Lantai 20x20 (WC) ex Roman
Keramik dinding 20x25 (WC) ex Roman
Lapisan Batu alam Motip Sisir

7 Rangka Atap Baja Ringan ex Taso


Pekerjaan Gewel Almunium

8 Penutup Atap Genteng Metal mutu Zincalum ex Sakura Roof

9 Kaca Kaca Polos 5 mm Standard SII

10 Cat Dinding Cat luar/eksterior weathershield ex Mowilex


Cat dalam/interior emulsion ex Mowilex

11 Pekerjaan Sanitasi Pipa PVC kualitas baik standard AW ex Wavin/AW


Kloset Jongkok + Wastafel ex KIA
Kran Air + Floor Drain ex San Ei Chroom

12 Pekerjaan Armatur Instalasi Titik Lampu Standard PLN


Stop Kontak + Saklar ex Brocco
Lampu TL 2 x 20 Watt ex Philip
Lampu SL 18 Watt ex Philip
MERK PRODUK

ex San Ei Chroom