REKAPITULASI BIAYA

PEMBANGUNAN GEDUNG KANTOR PT. TASPEN (Persero)


CABANG DEPOK
TAHUN ANGGARAN 2015

NO URAIAN PEKERJAAN JUMLAH HARGA

I PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
PEKERJAAN PASANGAN lt. 1 842,698,984.80
PEKERJAAN PASANGAN lt. 2 706,085,396.00

B PEKERJAAN PELAPIS LANTAI


PEKERJAAN LANTAI KERAMIK LT. 1 337,326,140.83
PEKERJAAN LANTAI KERAMIK LT. 2 145,609,120.61

C PEKERJAAN PLAFOND
PEKERJAAN PLAFOND LT.1 124,120,374.75
PEKERJAAN PLAFOND LT.2 74,580,980.32

D PEKERJAAN PENGECATAN
PEKERJAAN PENGECATAN lt.1 199,216,245.45
PEKERJAAN PENGECATAN lt.2 82,841,797.83

E PEKERJAAN KUSEN PINTU DAN JENDELA


PEKERJAAN KUSEN PINTU DAN JENDELA LT.1 159,423,345.00
PEKERJAAN KUSEN PINTU DAN JENDELA LT.2 78,159,605.00

F PEKERJAAN SANITARY
PEKERJAAN SANITARY LT. 1 62,250,000.00
PEKERJAAN SANITARY LT. 2 23,142,000.00

G PEKERJAAN LAIN - LAIN 321,089,500.00

II PEKERJAAN POS SATPAM DAN GALERI ATM CENTRE 135,126,584.12

III PEKERJAAN RUMAH HIDRAN, GENSET DAN GUDANG 319,497,472.64

IV PEKERJAAN PARKIR KARYAWAN 83,799,930.72


NO URAIAN PEKERJAAN JUMLAH HARGA

V PEKERJAAN SARANA DAN PRASARANA


A PEKERJAAN PAGAR 357,728,326.10
B PEKERJAAN HALAMAN DAN PARKIR 303,697,569.61
C PEKERJAAN SALURAN 96,318,725.93
D PEKERJAAN RESAPAN 70,074,811.82
E PEKERJAAN GROUND TANK 90,544,285.34
F PEKERJAAN BAK SAMPAH 2,979,362.86
G PEKERJAAN TIANG BENDERA 6,158,424.41
H PEKERJAAN SIGN POOL 22,407,225.73

VI PEKERJAAN STRUKTUR #REF!

VII PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 2,381,933,300.00

JUMLAH #REF!
PPN 10 % #REF!
PENYAMBUNGAN DAYA 105 Kva 96,875,000.00
JUMLAH TOTAL #REF!
DIBULATKAN #REF!
Tebilang : Sebelas Milyar Seratus Tujuh Puluh Lima Juta Rupiah

Jakarta, 28 September 2015


PT. TASPEN (Persero)
CABANG DEPOK

REFRIANI ROESLAI
Kepala Cabang
RENCANA ANGGARAN BIAYA ( RAB )
PEMBANGUNAN GEDUNG KANTOR TASPEN (Persero)
CABANG DEPOK
TAHUN ANGGARAN 2015

B. PEKERJAAN ARSITEKTUR

NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

I PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
PEKERJAAN PASANGAN lt. 1
1 Pek. Dinding 1/2 bata ad. 1:4 1,439.04 m2 117,449.20
2 Pek. Plesteran ad. 1pc : 4 ps, tebal 15 mm 2,878.07 m2 63,014.16
3 Pek. Acian 2,878.07 m2 50,520.80
4 Pek. Dinding kaca T. 12 cm 28.00 m2 1,377,203.52
5 Pek. Dinding Alcubon Panel ( ACP) 195.75 m2 937,203.52
6 Pek. Dinding partisi double gypsum 9 mm rk. Besi hollow 207.40 m2 179,700.22
7 Pek. Panel backdrop rangka hollow 20x40 + 58.50 m2 435,205.47
multiplak t. 12 mm panel backdrop finish duco (counter)
8 Pek. Panel backdrop rangka hollow 20x40 + 10.20 m2 435,205.47
multiplak t. 12 mm panel backdrop finish duco customer service)
9 Pek. Meja wastafel 0.39 m3 4,200,000.00
10 Pek. Plint kayu 2x10 cm 312.76 m1 30,000.00
11 Pek. Dinding keramik uk. 30x60 cm km/wc 204.00 m2 228,993.60
SUB. TOTAL
PEKERJAAN PASANGAN lt. 2
1 Pek. Dinding 1/2 bata ad. 1:4 597.89 m2 117,449.20
2 Pek. Plesteran ad. 1pc : 4 ps, tebal 15 mm 1,195.77 m2 63,014.16
3 Pek. Acian 1,195.77 m2 50,520.80
4 Pek. Dinding kaca T. 12 cm 113.30 m2 1,377,203.52
5 Pek. Dinding Alcubon Panel ( ACP) 282.75 m2 937,203.52
6 Pek. Dinding partisi double gypsum 9 mm rk. Besi hollow 208.03 m2 179,700.22
7 Pek. Dinding panel multiplek 9+4 mm finish HPL 48.00 m2 435,205.47
8 Pek. Meja wastafel 0.29 m3 4,200,000.00
9 Pek. Plint kayu 2x10 cm 231.00 m1 30,000.00
10 Pek. Dinding keramik uk. 30x60 cm km/wc 55.20 m2 228,993.60
SUB. TOTAL

B PEKERJAAN PELAPIS LANTAI


PEKERJAAN LANTAI KERAMIK LT. 1
1 Pek. lantai homogenious uk. 60x60 cm 574.00 m2 376,600.00
2 Pek. Lantai parquit R. auditorium 211.00 m2 371,280.80
3 Pek. Lantai ram batu andesit uk. 30x30 cm 7.60 m2 365,000.00
4 Pek. keramik 30x30 cm lantai km/wc 16.50 m2 264,403.92
5 Pasang keramik tangga 79.60 m2 376,600.00
6 Pasang step nosing uk. 10x60 cm 69.60 m1 81,946.37
SUB. TOTAL

PEKERJAAN LANTAI KERAMIK LT. 2


1 Pek. lantai homogenious uk. 60x60 cm 380.80 m2 376,600.00
2 Pek. keramik 30x30 cm lantai km/wc 8.32 m2 264,403.92
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

SUB. TOTAL

C PEKERJAAN PLAFOND
PEKERJAAN PLAFOND LT.1
1 Pek. plafond gypsum board t. 9 mm rangka besi hollow 801.50 m2 131,777.80
2 Pek. Drop celing 42.00 m2 131,777.80
3 Pek. Plafond multiplek 9 mm finish HPL 15.64 m2 380,000.00
4 Pek. list plafond gypsum uk. 10 cm 312.76 m1 22,453.64
SUB. TOTAL

PEKERJAAN PLAFOND LT.2


1 Pek. plafond gypsum board t. 9 mm rangka besi hollow 490.00 m2 131,777.80
2 Pek. Drop celing 36.60 m2 131,777.80
3 Pek. list plafond gypsum uk. 10 cm 231.00 m1 22,453.64
SUB. TOTAL

D PEKERJAAN PENGECATAN
PEKERJAAN PENGECATAN lt.1
1 Pengecatan dinding 3 lapis setara Dulux ICI 2,878.07 m2 42,702.88
2 Pengecatan plafond 3 lapis setara Dulux ICI 859.14 m2 42,702.88
3 Wall Paper 562.95 m2 70,391.20
SUB. TOTAL

PEKERJAAN PENGECATAN lt.2


1 Pengecatan dinding 3 lapis setara Dulux ICI 1,195.77 m2 42,702.88
2 Pengecatan plafond 3 lapis setara Dulux ICI 526.60 m2 42,702.88
3 Wall Paper 132.00 m2 70,391.20
SUB. TOTAL

E PEKERJAAN KUSEN PINTU DAN JENDELA


PEKERJAAN KUSEN PINTU DAN JENDELA LT.1
1 Kusen type P1 1.00 Unit 48,245,000.00
2 Kusen type P2 4.00 Unit 3,014,360.00
3 Kusen type P3 8.00 Unit 2,832,240.00
4 Kusen type P4 7.00 Unit 2,817,700.00
5 Kusen type P5 1.00 Unit 4,441,360.00
6 Kusen type P6 1.00 Unit 12,874,000.00
8 Kusen type PJ1 1.00 Unit 3,681,020.00
9 Kusen type PJ2 1.00 Unit 5,077,645.00
10 Kusen type PJ3 3.00 Unit 4,216,045.00
11 Kusen type J1 5.00 Unit 2,236,220.00
12 Kusen type J2 7.00 Unit 691,995.00
13 Kusen type J3 4.00 Unit 497,965.00
SUB. TOTAL
PEKERJAAN KUSEN PINTU DAN JENDELA LT.2
1 Kusen type P3 6.00 Unit 2,832,240.00
2 Kusen type P4 5.00 Unit 2,817,700.00
3 Kusen type P5 2.00 Unit 4,441,360.00
4 Kusen type PJ3 2.00 Unit 4,216,045.00
5 Kusen type J1 13.00 Unit 2,236,220.00
6 Kusen type J2 1.00 Unit 691,995.00
SUB. TOTAL
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

F PEKERJAAN SANITARY
PEKERJAAN SANITARY LT. 1
1 Closet duduk 8.00 bh 3,250,000.00
2 Jet spray 8.00 bh 320,000.00
3 Wastafel 5.00 bh 2,200,000.00
4 Floor drain 9.00 bh 126,000.00
5 Kaca cermin 8.40 m2 140,000.00
6 Shower lengkap dengan kran 8.00 bh 1,600,000.00
7 Kran air 18.00 bh 150,000.00
8 Tempat tisue 8.00 bh 185,000.00
9 Tempat sabun 8.00 bh 75,000.00
10 Gantungan handuk 8.00 bh 350,000.00
SUB. TOTAL

PEKERJAAN SANITARY LT. 2


1 Closet duduk 3.00 bh 3,250,000.00
2 Jet spray 3.00 bh 320,000.00
3 Wastafel 2.00 bh 2,200,000.00
4 Floor drain 4.00 bh 126,000.00
5 Kaca cermin 3.20 m2 140,000.00
6 Shower lengkap dengan kran 3.00 bh 1,600,000.00
7 Kran air 3.00 bh 150,000.00
8 Tempat tisue 3.00 bh 185,000.00
9 Tempat sabun 3.00 bh 75,000.00
10 Gantungan handuk 3.00 bh 350,000.00
SUB. TOTAL

G PEKERJAAN LAIN - LAIN


1 Pek. Reling tangga besi steinless steel + kaca tangga 22.52 m1 1,100,000.00
2 Pek. Reling + kaca void 20.80 m1 1,100,000.00
3 Pek. Kitchen zink + kran leher angsa 1 lubang 2.00 bh 1,200,000.00
4 Pek. Meja counter pelayanan 14.50 m1 2,200,000.00
5 Pek. Logo taspen 1.00 unit 2,500,000.00
6 Pek. Pengadaan LED 72 " 1.00 unit 60,000,000.00
7 Pek. Water proofing km/wc 9.82 m2 130,000.00
8 Pek. Penyedot asap 1.00 bh 4,000,000.00
9 Pek. White board 1.00 bh 500,000.00
10 Pek. Water proofing dak beton 249.95 m2 130,000.00
11 Pek. List beton 215.00 m1 75,000.00
12 Pek. Vertikal blind 113.40 m2 220,000.00
13 Pek. Papan nama / logo taspen uk. 120x120 cm 1.00 bh 5,000,000.00
14 Pek. Baja WF canopy depan 2,960.64 kg 22,500.00
15 Pek. Penutup kaca T. 10 cm canopy depan 53.50 m2 480,000.00
SUB. TOTAL

II PEKERJAAN POS SATPAM DAN GALERI ATM CENTRE


a PEKERJAAN STRUKTUR
1 Pek. Galian pondasi batu kali 32.68 m3 86,169.60
2 Pek. Urugan pasir bawah pondasi t 5 cm 0.97 m3 263,568.80
3 Pek. Batu kosong 2.91 m3 350,000.00
4 Pek. Pondasi batu kali ad. 1:4 10.89 m3 808,533.00
5 Pek. Urugan tanah kembali + pemadatan 14.42 m3 76,686.72
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

6 Pek. Sloof 20x25 cm 1.21 m3 4,405,600.00


7 Pek. Kolom 15x25 cm 1.58 m3 4,405,600.00
8 Pek. Balok 15x30 1.22 m3 4,405,600.00
9 Pek. Dak beton 3.33 m3 4,981,200.00

b PEKERJAAN ARSITEKTUR
1 Pek. Dinding 1/2 bata ad. 1:4 84.74 m2 117,449.20
2 Pek. Plesteran dan acian 169.47 m2 113,534.96
3 Pek. Lantai keramik 60x60 20.60 m2 376,600.00
4 Pek. Plint 10x60 32.70 m1 81,946.37
5 Pek. Profilan lis beton 22.21 m1 75,000.00
6 Pek. Finishing batu alam 38.40 m2 360,000.00
7 Pek. Kusen pintu aluminium 5/10 powder coating 2.00 bh 2,750,000.00
8 Pek. Kusen pintu frameless atm 1.00 bh 6,000,000.00
9 Pek. Kusen jendela j1 1.00 bh 1,500,000.00
10 Pek. Kusen jendela sudut 1.00 bh 250,000.00
11 Pek. Plafon Gypsum 9mm 20.60 m2 131,777.80
12 Pek. Pengecatan dinding 104.64 m2 42,702.88
13 Pek. Pengecatan plafon 20.60 m2 42,702.88
14 Water proofing dak beton 30.24 m2 130,000.00

PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Pek. Instalasi air hujan dia 3" 12.00 m1 105,000.00
2 Pek. Instalasi titik stop kontak nym 3x2,5 6.00 ttk 293,000.00
3 Pek. Instalasi titik lampu nym 3x2,5 7.00 ttk 216,000.00
4 Pek. Instalasi nym AC 3x2,5 1.00 ttk 326,000.00
5 Pek. Stop kontak 6.00 bh 45,000.00
6 Pek. Sakelar 3.00 bh 46,000.00
7 Pek. Lampu downlight 7.00 bh 180,000.00
SUB. TOTAL

III PEKERJAAN RUMAH HIDRAN, GENSET DAN GUDANG


a PEKERJAAN STRUKTUR
1 Pek. Galian pondasi batu kali 12.00 m3 86,169.60
2 Pondasi cakar ayam 2.00 m3 4,238,400.00
3 Sloof uk. 20x30 cm 2.76 m3 4,405,600.00
4 Kolom uk. 15x30 cm 1.51 m3 5,779,600.00
5 Balok uk. 20x30 cm 3.12 m3 5,400,600.00
6 Balok uk. 15x30 cm 0.54 m3 5,400,600.00
7 Plat beton t. 12 cm 7.56 m3 4,981,200.00
8 Kolom praktis lt. 2 0.72 m3 10,866,900.00
9 Ring balk uk. 15x15 cm 1.04 m3 5,400,600.00
10 Pek. Kuda kuda baja ringan 100.56 m2 150,000.00
11 Pek. Atap spandek 100.56 m2 150,000.00
12 Lisplank GRC 2/20 cm 37.33 m1 120,000.00
13 Pek. Pondasi Genset beton bertulang 2x1,5x0,6 1.80 m3 4,238,400.00

b PEKERJAAN ARSITEKTUR
1 Pek. Dinding 1/2 bata ad. 1:4 298.00 m2 117,449.20
2 Pek. Plesteran dan acian 596.00 m2 113,534.96
3 Pek. Jalusi hollow 4x4, 4x2 3.00 bh 550,000.00
4 Pek. Lantai floor beton 64.91 m2 275,000.00
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

5 Pek. Pengecatan dinding 596.00 m2 42,702.88


NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

6 Kusen pintu panel kayu kamper singkil 3.00 bh 3,000,000.00


7 Kusen pintu basi hollow 2.00 bh 2,500,000.00
8 Jendela besli hollow 2.00 bh 3,000,000.00
9 Jendela J2 3.00 bh 691,995.00

c PEKERJAAN MEKANIKAL ELEKTRIKAL


1 Pek. Instalasi titik stop kontak nym 3x2,5 2.00 ttk 293,000.00
2 Pek. Instalasi titik lampu nym 3x2,5 8.00 ttk 216,000.00
3 Pek. Stop kontak 2.00 bh 45,000.00
4 Pek. Sakelar 6.00 bh 46,000.00
5 Pek. Lampu TL 1X36 W 8.00 bh 450,000.00
SUB. TOTAL

IV PEKERJAAN PARKIR KARYAWAN


a PEKERJAAN STRUKTUR
1 Pek. Galian pondasi 6.91 m3 86,169.60
2 Pek. Urugan pasir bawah pondasi t 5 cm 0.29 m3 263,568.80
3 Pek. Pondasi Tapak 100x100x20 0.80 m3 5,400,600.00
4 Pek. Urugan tanah kembali + pemadatan 5.82 m3 24,942.72
5 Pek. Sloof 20x25 cm 0.75 m3 5,400,600.00
6 Pek. Kolom 30x30 cm 1.91 m3 5,400,600.00
7 Pek. Atap Canopy besi dia 3" dan besi dia 2" atap polycarbonat 77.50 m2 750,000.00

b PEKERJAAN ARSITEKTUR
1 Pek. Pasangan batu andesit 12.80 m2 360,000.00
2 Pek. Plesteran dan acian 10.08 m2 113,534.96
3 Pek. Pengecatan dinding 10.08 m2 42,702.88
SUB. TOTAL

V PEKERJAAN SARANA DAN PRASARANA


A PEKERJAAN PAGAR
PAGAR DEPAN
1 Galian pondasi 32.40 m3 86,169.60
2 Urugan pasir t. 10 cm 1.92 m3 263,568.80
3 Pondasi batu kali ad. 1:4 10.80 m3 808,533.00
4 Bor peil dia. 20 cm dalam 2 m1 10.00 bh 550,000.00
5 Sloof 20x20 cm besi 150 kg/m3 0.96 m3 5,400,600.00
6 Beton kolom 15x25 cm besi 150 kg/m3 0.83 m3 5,400,600.00
7 pasangan dinding bata tebal 1/2 bata ad. 1:4 43.00 m2 117,449.20
8 Plester + acian ad. 1:4 86.00 m2 113,534.96
9 Pasang batu alam 33.67 m2 360,000.00
10 Pasang pintu gerbang ( 2 unit ) 2.00 unit 8,500,000.00
11 Cat tembok 3 lapis 86.00 m2 42,702.88

PAGAR SAMPING DAN BELAKANG


1 Galian pondasi 243.00 m3 86,169.60
2 Urugan pasir t. 10 cm 14.40 m3 263,568.80
3 Pondasi batu kali ad. 1:4 55.80 m3 808,533.00
4 Sloof 20x20 cm besi 150 kg/m3 7.20 m3 5,400,600.00
5 Beton kolom 15x20 cm besi 150 kg/m3 3.60 m3 5,400,600.00
6 pasangan dinding bata tebal 1/2 bata ad. 1:4 360.00 m2 117,449.20
7 Plester + acian ad. 1:4 720.00 m2 113,534.96
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

8 Cat tembok 3 lapis 720.00 m2 42,702.88


SUB. TOTAL
B PEKERJAAN HALAMAN DAN PARKIR
1 Pasang urugan Makadam 20 cm dipadatkan 201.55 m3 160,000.00
2 Pasang urugan sirtu 9 cm dipadatkan 90.70 m3 282,040.00
3 Abu batu T. 5 cm 50.39 m3 150,000.00
4 Pasang paving blok t. 8 cm 1,007.75 m2 194,117.00
5 Pasang kansten 306.00 m1 126,897.76
6 Tanam rumput 227.00 m2 17,000.00
SUB. TOTAL
C PEKERJAAN SALURAN
1 Pekerjaan galian 91.00 m3 86,169.60
2 Urugan kembali 22.75 m3 24,942.72
3 Urugan pasir t. 7 cm 7.96 m3 263,568.80
4 Buis beton dia. 30 cm ad. 1:4 175.00 m1 125,000.00
5 Pasang dinding bata saluran ad. 1:4 243.60 m2 117,449.20
6 Plesteran ad. 1:4 243.60 m2 113,534.96
7 Floor ad. 1:3:5 0.61 m3 275,000.00
8 Bak kontrol 15.00 bh 500,000.00
SUB. TOTAL
D PEKERJAAN RESAPAN
PEKERJAAN RESAPAN AIR BEKAS
1 Galian tanah 57.60 m3 86,169.60
2 Pondasi beton 4.50 m3 5,400,600.00
3 Pasang dinding bata 52.50 m2 117,449.20
4 Plesteran + acian 52.50 m2 113,534.96
5 Kolom uk. 20/30 cm 1.08 m3 4,405,600.00
6 Balok uk. 15/30 cm 0.81 m3 4,405,600.00
7 Plat beton t. 15 cm 2.70 m3 4,981,200.00
8 Batu kali 15.00 m3 180,000.00
9 Ijuk 7.50 ikat 450,000.00
10 Pipa dia. 4 " 8.00 m1 103,906.31
SUB. TOTAL
E PEKERJAAN GROUND TANK
1 1 Galian tanah 30.00 m³ 86,169.60
2 2 Pasir Urug T=7 cm 0.84 m³ 263,568.80
3 3 Lantai kerja T=5 cm 0.60 m³ 160,000.00
4 4 Beton lantai + beton dinding T=15 cm K250, besi 197 kg/m³
Beton 16.75 m3 989,600.00
Besi 3,299.75 kg 12,200.00
Bekisting 106.03 m2 132,900.00
5 5 Beton plat atas T=15 cm; K225; Besi 147 kg/m³
Beton 2.69 m3 989,600.00
Besi 395.14 kg 12,200.00
Bekisting 10.75 m2 132,900.00
6 6 Tutup lubang Mainhole siku L 50.50.5 11.31 kg 22,500.00
7 7 Plat bordes T=6 mm 25.43 kg 22,500.00
8 8 Pasang water profing membrane 49.05 m² 130,000.00
9 9 Pipa Ø 1,5" untuk tangga 5.10 m' 102,000.00
10
### Pasang gembok besar 1.00 bh 85,000.00
SUB. TOTAL
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN

F PEKERJAAN BAK SAMPAH


1 Galian tanah 0.16 m3 86,169.60
2 Urugan pasir tebal 5 cm 0.07 m3 263,568.80
3 Pasangan bata rollaq 0.45 m3 220,000.00
4 Pasang kolom praktis 12 x 12 cm besi 226 kg/m3 0.04 m3 4,405,600.00
5 Pasang batu bata, tebal 1/2 bata ad. 1: 4 1.80 m2 117,449.20
6 Plesteran dan acian dinding bata ad. 1 : 4 3.90 m2 113,534.96
7 Rabat beton lantai bak sampah tebal 7 cm 0.07 m3 989,600.00
8 Pasang Pintu bak sampah rangka L.40.40.4
Besi L.40.40.4 23.23 kg 22,500.00
Plat baja tebal 3 mm 16.96 kg 22,500.00
Las sambungan baja 178.00 cm 3,000.00
Pasang engsel pintu 4.00 bh 75,000.00
Pasang Gembok 1.00 bh 85,000.00
Cat besi dengan cat minyak 2 lapis 2.98 m2 42,000.00
SUB. TOTAL
G PEKERJAAN TIANG BENDERA
1 Pekerjaan Galian Tanah Pondasi 0.30 m3 86,169.60
2 Pekerjaan Urugan Pasir di bawah Pondasi t = 10 cm 0.02 m3 263,568.80
3 Pekerjaan Lantai Kerja t = 5 cm 0.03 m3 160,000.00
4 Pekerjaan Beton Pondasi K.225 0.30 m3 5,400,600.00
5 Plester t = 1,5 cm ad. 1 : 4 0.81 m2 113,534.96
6 Pekerjaan Pengecatan Setara ICI 1.20 m2 42,702.88
7 Pekerjaan Urugan Tanah Bekas Galian 0.09 m3 24,942.72
8 Pekerjaan Pipa Baja d. 4" 3.90 m1 420,000.00
9 Pekerjaan Pipa Baja d. 3" 4.00 m1 280,000.00
10 Pekerjaan Pipa Baja d. 2.5" 8.00 m1 150,000.00
11 Pekerjaan Baut M.20 l = 3.5 cm 2.00 set 65,000.00
12 Pekerjaan Roda Tali d. 2" 1.00 set 90,000.00
13 Pekerjaan Penutup Pipa 3.00 bh 60,000.00
SUB. TOTAL

H PEKERJAAN SIGN POOL


1 Pek. Galian pondasi 3.46 m3 86,169.60
2 Pek. Urugan pasir bawah pondasi t 5 cm 0.14 m3 263,568.80
3 Pek. Pondasi Tapak 100x100x20 0.40 m3 5,400,600.00
4 Pek. Urugan tanah kembali + pemadatan 2.91 m3 24,942.72
5 Pek. Sloof 20x25 cm 0.20 m3 5,400,600.00
6 Pek. Kolom 30x30 cm 0.22 m3 4,405,600.00
7 Pek. Acp dan tulisan 19.00 m2 937,203.52
SUB. TOTAL
JUMLAH HARGA

169,013,744.42
181,359,415.53
145,402,600.94
38,561,698.56
183,457,589.04
37,269,826.46
25,459,519.71

4,439,095.75

1,638,000.00
9,382,800.00
46,714,694.40
842,698,984.80

70,221,114.94
75,350,442.10
60,411,257.02
156,037,158.82
264,994,295.28
37,382,318.80
20,889,862.33
1,228,500.00
6,930,000.00
12,640,446.72
706,085,396.00

216,168,400.00
78,340,248.80
2,774,000.00
4,362,664.68
29,977,360.00
5,703,467.35
337,326,140.83

143,409,280.00
2,199,840.61
JUMLAH HARGA

145,609,120.61

105,619,906.70
5,534,667.60
5,943,200.00
7,022,600.45
124,120,374.75

64,571,122.00
4,823,067.48
5,186,790.84
74,580,980.32

122,902,048.65
36,687,752.32
39,626,444.48
199,216,245.45

51,062,822.82
22,487,336.61
9,291,638.40
82,841,797.83

48,245,000.00
12,057,440.00
22,657,920.00
19,723,900.00
4,441,360.00
12,874,000.00
3,681,020.00
5,077,645.00
12,648,135.00
11,181,100.00
4,843,965.00
1,991,860.00
159,423,345.00

16,993,440.00
14,088,500.00
8,882,720.00
8,432,090.00
29,070,860.00
691,995.00
78,159,605.00
JUMLAH HARGA
JUMLAH HARGA

26,000,000.00
2,560,000.00
11,000,000.00
1,134,000.00
1,176,000.00
12,800,000.00
2,700,000.00
1,480,000.00
600,000.00
2,800,000.00
62,250,000.00

9,750,000.00
960,000.00
4,400,000.00
504,000.00
448,000.00
4,800,000.00
450,000.00
555,000.00
225,000.00
1,050,000.00
23,142,000.00

24,772,000.00
22,880,000.00
2,400,000.00
31,900,000.00
2,500,000.00
60,000,000.00
1,276,600.00
4,000,000.00
500,000.00
32,493,500.00
16,125,000.00
24,948,000.00
5,000,000.00
66,614,400.00
25,680,000.00
321,089,500.00

2,816,324.12
255,240.03
1,016,820.00
8,808,562.77
1,105,822.50
JUMLAH HARGA

5,332,978.80
6,938,820.00
5,394,436.92
16,569,463.68

9,952,057.96
19,240,769.67
7,757,960.00
2,679,646.30
1,665,750.00
13,824,000.00
5,500,000.00
6,000,000.00
1,500,000.00
250,000.00
2,714,622.68
4,468,429.36
879,679.33
3,931,200.00

1,260,000.00
1,758,000.00
1,512,000.00
326,000.00
270,000.00
138,000.00
1,260,000.00
135,126,584.12

1,034,035.20
8,476,800.00
12,159,456.00
8,738,755.20
16,849,872.00
2,916,324.00
37,657,872.00
7,824,168.00
5,589,621.00
15,084,000.00
15,084,000.00
4,479,600.00
7,629,120.00
-
-
34,999,861.60
67,666,836.16
1,650,000.00
17,850,250.00
JUMLAH HARGA

25,450,916.48
JUMLAH HARGA

9,000,000.00
5,000,000.00
6,000,000.00
2,075,985.00
-
-
586,000.00
1,728,000.00
90,000.00
276,000.00
3,600,000.00
319,497,472.64

595,604.28
75,907.81
4,320,480.00
145,266.40
4,050,450.00
10,304,344.80
58,125,000.00
-
-
4,608,000.00
1,144,432.40
430,445.03
83,799,930.72

2,791,895.04
506,052.10
8,732,156.40
5,500,000.00
5,184,576.00
4,455,495.00
5,050,315.60
9,764,006.56
12,121,200.00
17,000,000.00
3,672,447.68
-
-
20,939,212.80
3,795,390.72
45,116,141.40
38,884,320.00
19,442,160.00
42,281,712.00
81,745,171.20
JUMLAH HARGA

30,746,073.60
357,728,326.10

32,248,000.00
25,580,323.30
7,558,125.00
195,621,406.75
38,830,714.56
3,859,000.00
303,697,569.61

7,841,433.60
567,446.88
2,098,666.57
21,875,000.00
28,610,625.12
27,657,116.26
168,437.50
7,500,000.00
96,318,725.93

4,963,368.96
24,302,700.00
6,166,083.00
5,960,585.40
4,758,048.00
3,568,536.00
13,449,240.00
2,700,000.00
3,375,000.00
831,250.46
70,074,811.82

2,585,088.00
221,397.79
96,000.00
-
16,575,800.00
40,256,950.00
14,091,054.75
-
2,660,044.80
4,820,659.20
1,428,940.80
254,475.00
572,175.00
6,376,500.00
520,200.00
85,000.00
90,544,285.34
JUMLAH HARGA

13,787.14
18,449.82
99,000.00
176,224.00
211,408.56
442,786.34
69,272.00
-
522,675.00
381,600.00
534,000.00
300,000.00
85,000.00
125,160.00
2,979,362.86

25,850.88
4,941.92
4,000.00
1,620,180.00
91,963.32
51,243.46
2,244.84
1,638,000.00
1,120,000.00
1,200,000.00
130,000.00
90,000.00
180,000.00
6,158,424.41

297,802.14
37,953.91
2,160,240.00
72,633.20
1,080,120.00
951,609.60
17,806,866.88
22,407,225.73
RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR PT. TASPEN (PERSERO)
CABANG DEPOK

SATUAN KERJA : PT. TASPEN (PERSERO) CABANG DEPOK


PEKERJAAN : JASA KONSULTASI PERENCANAAN
LOKASI : JL. KALIMULAYA - DEPOK

PEKERJAAN MEKANIKAL & ELEKTRIKAL


HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN

I PEKERJAAN ELEKTRIKAL
1.a PEK. Panel Tegangan Menengah
- Panel Tegangan Menengah, Incoming, Metering, Arrester, 1x Outgoing set 1.00 22,500,000.00 22,500,000.00
- Trafo 105 Kva unit 1.00 68,000,000.00 68,000,000.00
- Grounding, PTM, Trafo, & MDP unit 1.00 2,500,000.00 2,500,000.00
b PEK. Kabel Utama -
- Dari PTM ke Trafo N2XSY 3 x 1 x 35 mm bh 25.00 320,000.00 8,000,000.00
- Dari Trafo ke MDP NYY 4x95 mm bh 20.00 415,000.00 8,300,000.00
- Material bantu breket Conector dll ls 1.00 3,500,000.00 3,500,000.00
Sub Total 112,800,000.00

1 PEKERJAAN GENERATOR SET


Pengadaan dan pemasangan genset sesuai spesifikasi Teknis sebagai unit 1.00 265,000,000.00 265,000,000.00
berikut : -
- Genset Silent Type -
- Rated Power(KVA) 100 kva -
- Rated Voltage 380 -400 Volt 50 h -
- Module AMF, ATS,c/w battery, Charger lengkap dengan UVT,relay dan acesoriesnya -
- Starting System Elektric Starter -
- Cooling System Radiator c/w fan -
- Rated Frekuensi 50 hz -
- Rated Speed 1500 put/min -
- Connections Method Three phase four wires -
- Standart part Ampere meter,frequency meter, voltmeter -
- Batterey Emergency stop, hour meter, Fuel Tank & Baterey -
- Daily Tank 150 ltr -
Generator steamford -
Test & Comitioning -
Sub Total 265,000,000.00
2 PEK KABEL TOEFOER & PEMASANGAN KABEL TRAY
- NYY 4x120mm (LVMDP s/d GENSET) m' 10.00 580,000.00 5,800,000.00
- NYY 4x120mm (LVMDP s/d KWH METER PLN) m' 10.00 580,000.00 5,800,000.00
- NYY 4x50mm (LVMDP s/d SDP LT 1) m' 38.00 298,000.00 11,324,000.00
- NYY 4x50mm (LVMDP s/d SDP LT 2) m' 46.00 298,000.00 13,708,000.00
- NYY 4x50mm (LVMDP s/d SDP Pompa Hydrant) m' 14.00 298,000.00 4,172,000.00
- NYY 4x16mm (LVMDP s/d SDP Pompa air bersih) m' 22.00 110,000.00 2,420,000.00
- NYY 4x25mm (LVMDP s/d SDP Penerangan halaman) m' 44.00 110,000.00 4,840,000.00
- Pek jasa Pemasangan kabel toefoer m' 184.00 30,000.00 5,520,000.00
- Pas Kabel tray uk 500 / 3000 mm lengkap suport Penggantung acessories lainya m' 23.00 405,000.00 9,315,000.00
- Pas cover tray uk 500 / 3000 mm lengkap dengan acessories/ material bantu lainya m' 23.00 330,000.00 7,590,000.00
- Pas Kabel tray uk 250 / 3000 mm lengkap suport Penggantung acessories lainya m' 31.00 250,000.00 7,750,000.00
- Pas cover tray uk 250 / 3000 mm lengkap dengan acessories/ material bantu lainya m' 31.00 170,000.00 5,270,000.00
Sub Total 83,509,000.00
3 PEK LOW VOLTAGE MEDIUM DISTRIBUSI PANEL (LVMDP)
a Pek Pengadaan Dan Pemasangan Panel Tegangan Rendah /LV MDP lengkap dengan
Testing Commitioning sesuai spesifikasi Teknis dan material Bantu Lainya
- MCCB 4 P 400A/36 Ka (NS400N) cw motorest bh 2.00 12,000,000.00 24,000,000.00
- MCCB 250A/36 Ka (NS 250N) bh 3.00 1,950,000.00 5,850,000.00
MCCB 100A/25 Ka (NS 100N) bh 2.00 110,000.00 220,000.00
- MCCB 80A/25 Ka (NS 100N) bh 1.00 820,000.00 820,000.00
- MCCB 50A/25 Ka (NS 100N) bh 2.00 820,000.00 1,640,000.00
- MCB 3P 6A/6 Ka bh 3.00 300,000.00 900,000.00
- MCB 1P 6A/6 Ka bh 4.00 65,000.00 260,000.00
- CU Busbar 500A btg 5.00 850,000.00 4,250,000.00
- CT,500/5A GAE bh 3.00 290,000.00 870,000.00
- Amperemeter 0-500A(96x96)mm GAE bh 3.00 290,000.00 870,000.00
- Selector switch Voltmeter( 7 position )GAE bh 1.00 190,000.00 190,000.00
- Voltmeter 0-500 Volt(96x96) GAE bh 1.00 330,000.00 330,000.00
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
- Emergency Push Button bh 2.00 183,000.00 366,000.00
- Frequency meter Let GAE bh 1.00 930,000.00 930,000.00
- Emergency Push Buttom on bh 2.00 290,000.00 580,000.00
- Push buttom on bh 2.00 35,000.00 70,000.00
- Push buttom off bh 2.00 35,000.00 70,000.00
- Indicator lamp RST bh 6.00 35,000.00 210,000.00
- Fuse Control pilot lamp 5A bh 6.00 15,000.00 90,000.00
- Sirine /Alarm bh 1.00 245,000.00 245,000.00
- Grounding / Pentanahan BC 50mm c/w capir rood ext 2 ohm unt 1.00 2,500,000.00 2,500,000.00
- Wiring Pengkabelan acessories + jasa Pasang unt 1.00 4,500,000.00 4,500,000.00
- Box Panel Freestanding plat 2mm uk H180xW150XT60 cm unt 1.00 9,500,000.00 9,500,000.00
Sub Total 59,261,000.00
4 PEK SDP,INSTALASI PENERANGAN STOP KONTAK & ARMATURE LANTAI 1
a Pek.Sub Distribution Panel (SDP) penerangan dan stop kontak.
- MCCB 250A/36 Ka (NS 250N) bh 1.00 1,950,000.00 1,950,000.00
- MCB 3P 40A/6 Ka bh 11.00 395,000.00 4,345,000.00
- MCB 1P 20A/6 Ka bh 21.00 75,000.00 1,575,000.00
- MCB 1P 10A/6 Ka bh 12.00 75,000.00 900,000.00
- CU Busbar 250 A LOKAL bh 5.00 480,000.00 2,400,000.00
- CT,250/5A GAE bh 3.00 290,000.00 870,000.00
- Amperemeter 0-200A(96x96)mm GAE bh 3.00 290,000.00 870,000.00
- Selector switch Voltmeter( 7 position )GAE bh 1.00 190,000.00 190,000.00
- Voltmeter 0-500 Volt(96x96) GAE bh 1.00 332,400.00 332,400.00
- Indicator lamp RST bh 3.00 35,000.00 105,000.00
- Fuse pilot lamp 5A bh 3.00 15,000.00 45,000.00
- Grounding BC 25mm unt 1.00 840,000.00 840,000.00
- Wiring Pengkabelan & acessories unt 1.00 1,000,000.00 1,000,000.00
- Box Panel Wall Mounted plat T 2mm uk H100xW70XT25cm fin powder coating unt 1.00 1,800,000.00 1,800,000.00
b Pek instalasi titik cahaya, stop kontak Tenaga, dan AC lengkap dengan pipa -
conduit high impect PVC,klem,teedus, dan acessories lainya -
- Instalasi titik cahaya NYM 3x2,5mm titik 121.00 216,000.00 26,136,000.00
- Instalasi titik stop kontak tenaga NYM 3x2,5mm titik 60.00 293,000.00 17,580,000.00
- Instalasi exhouse fan NYM 3x2,5mm titik 7.00 326,000.00 2,282,000.00
- Instalasi titik stop kontak AC NYM 3x2,5mm titik 6.00 326,000.00 1,956,000.00
- Instalasi titik stop kontak AC 3 P NYM 4x4mm titik 11.00 630,000.00 6,930,000.00
c Pek Armature lampu,Future/saklar,stop kontak,lengkap -
dengan pemasangan -
- GMS 1X36 W ACR bh 2.00 335,000.00 670,000.00
- RM 300 M5 T 5 3x14 watt bh 60.00 1,350,000.00 81,000,000.00
- Indirec lighting LED strip Cw trafo bh 56.00 45,000.00 2,520,000.00
- Exhous fan type ceiling bh 7.00 400,000.00 2,800,000.00
- RD 150 STD PLC 18 Watt bh 45.00 180,000.00 8,100,000.00
- RD 150 STD LED Sport 10 Watt bh 69.00 230,000.00 15,870,000.00
- Armature Profile LED 30 Watt bh 4.00 1,100,000.00 4,400,000.00
- Single switch bh 16.00 46,000.00 736,000.00
- Double switch bh 17.00 76,000.00 1,292,000.00
- Stop kontak 16 A bh 36.00 45,000.00 1,620,000.00
- Out let elektrikal, kabel data , telephon, printer (stop kontak lantai) bh 24.00 756,000.00 18,144,000.00
d Pek AC dan Instalasi pipa tembaga, breket, duck tape dan halmaflex -
lengkap dengan pemasangan dan test commitioning -
- Pipa Refrigator dari FCU-OCUlengkap Halmaflex ,duck tape dan kabel kontrol 4x4mm m' 4.00 430,000.00 1,720,000.00
Pipa Drain 1 " PVC lengkap dengan halmaflex -
- AC ceiling Cassette wireless cap 45000 BTU/H unt 5.00 31,000,000.00 155,000,000.00
- Pipa Refrigator dari FCU-OCU lengkap Halmaflex ,duck tape dan kabel kontrol 4x4mm m' 60.00 435,000.00 26,100,000.00
Pipa Drain 1 " PVC lengkap dengan halmaflex -
- AC ceiling Cassette wireless cap 9000 BTU/H unt 6.00 11,000,000.00 66,000,000.00
- Pipa Refrigator FCU-OCU lengkap Halmaflex ,duck tape dan kabel kontrol 3x2,5mm m' 72.00 110,000.00 7,920,000.00
Sub Total 465,998,400.00
5 PEK SDP,INSTALASI PENERANGAN STOP KONTAK & ARMATURE LANTAI 2
a Pek.Sub Distribution Panel (SDP) penerangan dan stop kontak.
- MCCB 250A/36 Ka (NS 250N) bh 1.00 1,950,000.00 1,950,000.00
- MCB 3P 40A/6 Ka bh 11.00 395,000.00 4,345,000.00
- MCB 1P 20A/6 Ka bh 21.00 75,000.00 1,575,000.00
- MCB 1P 10A/6 Ka bh 12.00 75,000.00 900,000.00
- CU Busbar 250 A LOKAL bh 5.00 480,000.00 2,400,000.00
- CT,250/5A GAE bh 3.00 290,000.00 870,000.00
- Amperemeter 0-200A(96x96)mm GAE bh 3.00 290,000.00 870,000.00
- Selector switch Voltmeter( 7 position )GAE bh 1.00 190,000.00 190,000.00
- Voltmeter 0-500 Volt(96x96) GAE bh 1.00 332,400.00 332,400.00
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
- Indicator lamp RST bh 3.00 35,000.00 105,000.00
- Fuse pilot lamp 5A bh 3.00 15,000.00 45,000.00
- Grounding BC 25mm unt 1.00 840,000.00 840,000.00
- Wiring Pengkabelan & acessories unt 1.00 1,000,000.00 1,000,000.00
- Box Panel Wall Mounted plat T 2mm uk H100xW70XT25cm fin powder coating unt 1.00 1,800,000.00 1,800,000.00
b Pek instalasi titik cahaya, stop kontak Tenaga, dan AC lengkap dengan pipa -
conduit high impect PVC,klem,teedus, dan acessories lainya -
- Instalasi titik cahaya NYM 3x2,5mm titik 85.00 216,000.00 18,360,000.00
- Instalasi titik stop kontak tenaga NYM 3x2,5mm titik 29.00 293,000.00 8,497,000.00
- Instalasi exhouse fan NYM 3x2,5mm titik 3.00 326,000.00 978,000.00
- Instalasi titik stop kontak AC NYM 3x2,5mm titik 5.00 326,000.00 1,630,000.00
- Instalasi titik stop kontak AC 3 P NYM 4x4mm titik 5.00 630,000.00 3,150,000.00
c Pek Armature lampu,Future/saklar,stop kontak,lengkap -
dengan pemasangan -
- GMS 1X36 W ACR bh 1.00 335,000.00 335,000.00
- RM 300 M5 T 5 3x14 watt bh 42.00 1,350,000.00 56,700,000.00
- Indirec lighting LED strip Cw trafo bh 38.00 45,000.00 1,710,000.00
- Exhous fan type ceiling bh 3.00 400,000.00 1,200,000.00
- RD 150 STD PLC 18 Watt bh 34.00 180,000.00 6,120,000.00
- Single switch bh 6.00 46,000.00 276,000.00
- Double switch bh 12.00 76,000.00 912,000.00
- Stop kontak 16 A bh 15.00 45,000.00 675,000.00
- Out let elektrikal, kabel data , telephon, printer (stop kontak lantai) bh 14.00 756,000.00 10,584,000.00
d Pek AC dan Instalasi pipa tembaga, breket, duck tape dan halmaflex -
lengkap dengan pemasangan dan test commitioning -
- AC Floor standing cap 45000 BTU/H (R server) unt 1.00 32,000,000.00 32,000,000.00
- Pipa Refrigator dari FCU-OCUlengkap Halmaflex ,duck tape dan kabel kontrol 4x4mm m' 12.00 430,000.00 5,160,000.00
Pipa Drain 1 " PVC lengkap dengan halmaflex -
- AC ceiling Cassette wireless cap 45000 BTU/H unt 4.00 31,000,000.00 124,000,000.00
- Pipa Refrigator dari FCU-OCU lengkap Halmaflex ,duck tape dan kabel kontrol 4x4mm m' 48.00 430,000.00 20,640,000.00
Pipa Drain 1 " PVC lengkap dengan halmaflex -
- AC ceiling Cassette wireless cap 9000 BTU/H unt 5.00 11,000,000.00 55,000,000.00
- Pipa Refrigator FCU-OCU lengkap Halmaflex ,duck tape dan kabel kontrol 3x2,5mm m' 60.00 110,000.00 6,600,000.00
e Pek R Server dan UPS -
- UPS cap 20 kva unit 1.00 65,000,000.00 65,000,000.00
- Rak Server 19 U unit 1.00 11,000,000.00 11,000,000.00
- Hydrant Sprinkler Powder Lengkap tabung apar unit 1.00 60,000,000.00 60,000,000.00
Sub Total 507,749,400.00
6 PEKERJAAN ELEKTRIKAL PENERANGAN LUAR
a Pek.Sub Distribution Panel penerangan luar
- MCCB 50A/25 Ka (NS 100N) bh 1.00 820,000.00 820,000.00
- MCB 1P 10A/6 Ka bh 6.00 75,000.00 450,000.00
- Kontaktor LC1 32A bh 1.00 900,000.00 900,000.00
- Timer Theben Analoc 10 A bh 1.00 1,000,000.00 1,000,000.00
- Indicator lamp RST bh 3.00 35,000.00 105,000.00
- Fuse pilot lamp 5A bh 3.00 15,000.00 45,000.00
- Grounding BC 16mm unt 1.00 600,000.00 600,000.00
- Wiring Pengkabelan & acessories unt 1.00 750,000.00 750,000.00
- Box Panel freestanding out door plat T 2mm uk H70xW50XT20 cm unt 1.00 1,000,000.00 1,000,000.00
b Pek instalasi titik cahaya, stop kontak Tenaga, lengkap dengan pipa -
conduit high impect PVC,klem,teedus, dan acessories lainya -
- Instalasi titik cahaya NYFGBY 3x2,5mm mtr 240.00 42,500.00 10,200,000.00
c Pek Armature lampu, penerangan luar lengkap dengan Pemasangan -
- Pas Lampu penerangan luar LED 50 watt c/w base plate 30x30 x 2cm Tiang octagonal bh 6.00 7,500,000.00 45,000,000.00
H 7mtr Lengkap pondasi tiang -
Sub Total 60,870,000.00
II PEKERJAAN ELEKTRONIKA
1 Peralatan Utama
- PABX 4 Line 32 Extantion Unit 1.00 13,000,000.00 13,000,000.00
- MDF Telepon 50 Pairs Unit 1.00 1,000,000.00 1,000,000.00
- TB TP 12 Pairs Unit 2.00 400,000.00 800,000.00
- Patch Panel 8 Port Unit 2.00 4,000,000.00 8,000,000.00
Pekerjaan Instalasi Telepon dan kabel data LT 1 -
- Instalasi Telepon kabel ITC 4x06mm dlm pipa PVC hight Impack titik 21.00 215,000.00 4,515,000.00
- Instalasi Data kabel UTP 4 pairs cat 6 dlm pipa PVC hight Impack titik 24.00 280,000.00 6,720,000.00
Pekerjaan Instalasi Telepon dan kabel data LT 2 -
- Instalasi Telepon kabel ITC 4x06mm dlm pipa PVC hight Impack titik 9.00 215,000.00 1,935,000.00
- Instalasi Data kabel UTP 4 pairs cat 6 dlm pipa PVC hight Impack titik 14.00 280,000.00 3,920,000.00
2 Pek Fire alarm lt. 1 dan 2 -
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
Pek pemasangan tire alarm lengkap material bantu dan acessories lainya -
- MCFA 12 zona unit 1.00 12,500,000.00 12,500,000.00
- Instalasi. Fire alarm (NYA 1,5mm) ttk 54.00 160,000.00 8,640,000.00
- ROR detektor bh 23.00 300,000.00 6,900,000.00
- Smoke detektor bh 14.00 400,000.00 5,600,000.00
- Head detektor bh 14.00 330,000.00 4,620,000.00
3 Pek sound system lt. 1 dan 2 -
- Pek pemasangan sound system lengkap material bantu dan acessories lainya -
- Microfon Metteng : Pyle PDWM8300 Professional Conference Desktop VHF Wireless Microphone set 1.00 4,000,000.00 4,000,000.00
System - Pyle PDWM8300 Professional Conference Desktop VHF Wireless Microphone
System_x000D_Professional VHF 8 Channel Wireless System - 1/4 inch Individual line outputs and -
Mixed 1/4 inch Outputs - Operation Range: 50-180 Meters - Receiver Dimensions With Rack Mount -
1.8 inch x 18.9 inch x 8.7 inch_x000D_
Eight Table Top Microphones Included - Carrier Frequency: 174MHz-216MHz - Signal to Noise -
Ratio: 90dB - Microphone Dimensions: 12.7 inch X 4.9 inch X 5.9 inch_x000D_ -
Dual Telescoping Receiver Antennas - Dynamic Range: 92dB - Receiver Power Supply: AC
110/240V_x000D_ -
Eight Volume Controls - Total Harmonic Distortion: 0.5% - Microphone Power Source: 9 Volt_x000D_ -
On/Off Broadcasting Switch - Frequency Response: 50Hz - 16KHz - Receiver Dimensions Without
Rack Mount: 1.8 inch x 16.5 inch x 8.7 inch_x000D_ -
Professional VHF 8 Channel Wireless System_x000D_ -
Eight Table Top Microphones Included, Antenna : 1/ 4 Herical Antena,Temperatur Operasional : -10
C sampai + 50 C_x000D_ -
-
-
4 Pek CCTV lt 1,2 & hal parkir -
Peralatan Utama CCTV -
Digital Video Recorder 32 Channel unit 1.00 20,000,000.00 20,000,000.00
LCD Monitor 32" unit 2.00 6,500,000.00 13,000,000.00
Wiring dan Accessories R Control Ls 1.00 1,200,000.00 1,200,000.00
- Pekerjaan Instalasi Kamera CCTV Halaman Parkir -
Instalasi kamera CCTV, Coaxial Cable RG-11 dan Kabel Power DC NYMHY 3x1,5mm titik 16.00 500,000.00 8,000,000.00
Color Camera outdoor bh 16.00 2,700,000.00 43,200,000.00
- Pekerjaan Instalasi Kamera CCTV LT 1 -
Instalasi kamera CCTV, Coaxial Cable RG-11 dan Kabel Power DC NYMHY 3x1,5mm titik 8.00 520,000.00 4,160,000.00
Color Camera Indoor Type Fixed Dome c/w Access. bh 8.00 1,900,000.00 15,200,000.00
- Pekerjaan Instalasi Kamera CCTV LT 2 titik 8.00 500,000.00 4,000,000.00
Instalasi kamera CCTV, Coaxial Cable RG-11 dan Kabel Power DC NYMHY 3x1,5mm bh 8.00 1,900,000.00 15,200,000.00
Color Camera Indoor Type Fixed Dome c/w Access.
Sub Total 206,110,000.00
III PEKERJAAN MEKANIKAL
1 PEKERJAAN POMPA AIR BERSIH
Pek. Pengadaan dan pemasangan Pompa air,Panel dan System Pengkabelan sesuai dengan
spesifikasi teknis lengkap dengan material bantu Fiting, Test commitioning dan acesories lainya)
1 Pompa sumber unt 1.00 25,000,000.00 25,000,000.00
- Kap 120 liter/ min -
- Power 3 hp,380 Volt 50 HZ 2900 r/min -
- Head max 120m -
- Type submersible -
2 Pompa Transfer unt 1.00 11,500,000.00 11,500,000.00
- Kap 400 lpm -
- Head 50 mtr -
- Power 5 hp, 380 - 220 Volt 50 Hz cw thermis Over load -
- Type Centrifugal End Suction -
3 Pas WLC ( Water Level Control) unt 1.00 2,500,000.00 2,500,000.00
4 Pek.Pengeboran sumur dalam / Pantek sumur dia 5" lengkap pipa cassing m' 120.00 275,000.00 33,000,000.00
PVC class AW Dia 4" ,dan accessories lainya -
5 Pas Instalasi Pipa deep well GIV Medium Φ 2" lengkap dengan Acessories m' 120.00 85,000.00 10,200,000.00
Fitting dan material bantu lainya (dr deep well s/d GWT) -
8 Panel pompa transfer,sumber system DOL lengkap WLC (Water Level Control) unt 2.00 4,500,000.00 9,000,000.00
10 Kabel Power NYY 3x2,5 mm (Panel Pompa s/d Pompa Transfer) m' 17.00 35,000.00 595,000.00
1 PEK PLUMBING ( Air kotor dan air Bersih) -
a Pek instalasi pipa PVC air kotor dan air bersih toilet lantai 1. -
lengkap dengan fiting,klem,dan acessories lainya -
- Pas pipa PVC Class AW dia 4" m' 19.00 182,500.00 3,467,500.00
- Pas Pipa PVC Class AW dia 3" m' 11.00 105,000.00 1,155,000.00
- Pas pipa PVC Class AW dia 2" m' 13.00 68,000.00 884,000.00
- Pas pipa PVC Class AW dia 1,25" m' 48.00 45,000.00 2,160,000.00
- Pas pipa PVC Class AW dia 1" m' 24.00 29,000.00 696,000.00
- Pas pipa PVC Class AW dia 0,5" m' 22.00 18,000.00 396,000.00
b Pek instalasi pipa PVC air kotor dan air bersih toilet lantai 2. -
lengkap dengan fiting,klem,dan acessories lainya -
- Pas pipa PVC Class AW dia 4" m' 26.00 182,500.00 4,745,000.00
- Pas Pipa PVC Class AW dia 3" m' 16.00 105,000.00 1,680,000.00
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
- Pas pipa PVC Class AW dia 2" m' 19.00 68,000.00 1,292,000.00
- Pas pipa PVC Class AW dia 1,25" m' 27.00 45,000.00 1,215,000.00
- Pas pipa PVC Class AW dia 1" m' 11.00 29,000.00 319,000.00
- Pas pipa PVC Class AW dia 0,5" m' 17.00 18,000.00 306,000.00
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
c Pek instalasi pipa PVC air hujan -
lengkap dengan fiting,klem,dan acessories lainya -
- Pas pipa PVC Class AW dia 4" m' 28.00 182,500.00 5,110,000.00
- Pas Pipa PVC Class AW dia 3" m' 44.00 105,000.00 4,620,000.00
Sub Total 119,840,500.00
2 PEKERJAAN HYDRANT
Pek. Pengadaan dan Pemasangan Pompa Hydrant
lengkap dengan material bantu, sesuai spesifikasi teknis dan acessories lainya
1 Electric Main Pump unit 1.00 30,000,000.00 30,000,000.00
Pompa -
- Jenis : horizontal single/multi stage -
- centrifugal pump, self priming. -
- Debit : 750 USGPM -
- Head : 75 m -
- Efisiensi : 70 % minimum -
- Kecepatan putar : 2900 rpm -
Motor Penggerak -
- Jenis : 3 phase TEFC induction -
- Tegangan : 380/660 V -
- Starter : wye-delta -
- Daya poros : 35 kW (min) -
- Kopling : direct, base skid mounted -
- Kecepatan putar : 2900 rpm -
2 Electric Jockey Pump unit 1.00 10,500,000.00 10,500,000.00
Pompa -
- Jenis : vertikal multi stage -
- centrifugal pump, self priming -
- Debit : 25 USGPM -
- Head : 80 m -
- Efisiensi : 70 % minimum -
- Kecepatan putar : 1450 rpm -
Motor Penggerak -
- Jenis : 3 phase TEFC induction -
- Tegangan : 380/660 V -
- Starter : wye-delta -
- Daya poros : 4 kW (min) -
- Kopling direct, base skid mounted -
- Kecepatan putar : 1450 rpm -
3 Diesel Pump unit 1.00 95,000,000.00 95,000,000.00
Pompa -
- Jenis : horizontal single/multi stage -
- centrifugal pump, self priming -
- Debit : 750 USGPM -
- Head : 75 m -
- Efisiensi : 70 % minimum -
- Kecepatan putar : 2900 rpm -
Motor Penggerak (DIESEL ENGINE) -
- Jenis : in-line internal combustion -
- Daya poros : 81 HP (min) -
- Kopling : direct, base skid mounted -
- Kecepatan putar : 2900 rpm -
4 Tangki Bahan Bakar (Solar) unit 1.00 4,500,000.00 4,500,000.00
- Kapasitas 200 liter, lengkap dengan dudukan, -
pelat besi min. 3 mm. Tangki dicat merah. -
5 Panel Kontrol Hydrant Pump unit 1.00 21,000,000.00 21,000,000.00
- Panel kontrol start diesel pump, lengkap dgn. -
automatic battery charger 12 V/5A. -
6 Pompa Tangan bh 1.00 360,000.00 360,000.00
- Manual swing pump kap. 10 l/menit. -
7 Accumulator/battery bh 2.00 1,350,000.00 2,700,000.00
- Kapasitas 12V/100 AH, lengkap dgn. dudukan, -
klem terminal, hydrometer dan battery tester -
8 Pemipaan BBM ls 1.00 1,500,000.00 1,500,000.00
- Pemipaan BBM dari tangki BBM ke mesin
diesel (BSP sch. 30), lengkap dengan fitting
dan alat bantu pemipaan, dicat warna merah
9 Pekerjaan Valve & acessories
a Acessories Pompa Elektrik & Diesel
- Food Valve Φ 4" bh 2.00 2,950,000.00 5,900,000.00
- Gate Valve Φ 4" bh 2.00 2,750,000.00 5,500,000.00
HARGA
NO URAIAN PEKERJAAN SAT VOL JUMLAH HARGA
SATUAN
- Check Valve Φ 4" bh 2.00 2,500,000.00 5,000,000.00
- Strainter Φ 4" bh 2.00 1,950,000.00 3,900,000.00
- Flexible joint Φ 4" bh 4.00 550,000.00 2,200,000.00
- Pressure Gauge bh 2.00 150,000.00 300,000.00
- Pressure Switch bh 2.00 900,000.00 1,800,000.00
b Acessories Pompa Jockey -
- Food Valve Φ 2" bh 1.00 1,950,000.00 1,950,000.00
- Gate Valve Φ 2" bh 1.00 1,000,000.00 1,000,000.00
- Check Valve Φ 2" bh 1.00 480,000.00 480,000.00
- Strainter Φ 2" bh 1.00 720,000.00 720,000.00
- Flexible joint Φ 2" bh 2.00 350,000.00 700,000.00
10 Pek. Instalasi pipa hydrant di ruang pompa -
Pemipaan pompa hydrant -
- Pipa Header Black Steel Φ 6" lengkap Flange unit 1.00 12,500,000.00 12,500,000.00
- Pipa Black Steel Φ 4" m' 9.00 310,000.00 2,790,000.00
- Pipa Black Steel Φ2" m' 11.00 160,000.00 1,760,000.00
- Pressure tank cap 400 ltr max press 25 kg/ cm2 bh 1.00 7,200,000.00 7,200,000.00
- Pipa BS Φ 4" (outdoor + riser dalam shaft) m' 63.00 360,000.00 22,680,000.00
- Pipa BS Φ 3" (outdoor + riser dalam shaft) m' 63.00 155,000.00 9,765,000.00
11 Pek Instalasi pipa hydrant Indoor Lantai 1 -
Menggunakan Pipa black steel SCH 40 lengkap dengan material bantu , -
Fitting dan Acessories lainya -
- Pipa BS Φ 4" m' 6.00 310,000.00 1,860,000.00
- Pipa BS Φ 3" m' 41.00 155,000.00 6,355,000.00
- Gate Valve Φ 4" bh 1.00 2,700,000.00 2,700,000.00
- Indoor Hydrant Box lengkap lauding valve hose rack dan Nozzle unit 2.00 3,200,000.00 6,400,000.00
12 Pek Instalasi pipa hydrant Indoor Lantai 2
Menggunakan Pipa black steel SCH 40 lengkap dengan material bantu ,
Fitting dan Acessories lainya
- Pipa BS Φ 4" m' 12.00 310,000.00 3,720,000.00
- Pipa BS Φ 3" m' 41.00 155,000.00 6,355,000.00
- Gate Valve Φ 4" bh 1.00 2,700,000.00 2,700,000.00
- Indoor Hydrant Box lengkap lauding valve hose rack dan Nozzle unit 2.00 3,200,000.00 6,400,000.00

13 Pek Instalasi pipa hydrant splinkler lt. 1 dan 2


Menggunakan Pipa black steel SCH 40 lengkap dengan material bantu ,
Fitting dan Acessories lainya
Pipa BS Φ 3" m' 40.00 155,000.00 6,200,000.00
Gate Valve Φ 3" bh 2.00 1,800,000.00 3,600,000.00
Pipa BS Φ 1" bh 140.00 105,000.00 14,700,000.00
Flow Switch bh 4.00 3,350,000.00 13,400,000.00
Splinker 3/4 " unit 48.00 400,000.00 19,200,000.00
Sub Total 345,295,000.00

3 Pek. Penangkal petir & Grounding Perangkat lunak set 1.00 60,000,000.00 60,000,000.00
1 - EF atau Prefextor radius R 80
- Coaxial kabel 70 mm2
- Conecting Slove + Tiang Galvanis 6 meter
- Cooper Root
- Grounding + Box Control ukuran 40 x 40 x 40 cm
- Biaya Instalasi
2 Pek. Grounding untuk perangkat lunak dan ups set 1.00 5,000,000.00 5,000,000.00
Sub Total 65,000,000.00
16 Pek Lain Lain
1 Pek. Water torn kap 1000 liter unit 2.00 1,500,000.00 3,000,000.00
2 Septi Tank Bio Master kap. 7 m3 lengkap terpasang unit 1.00 65,000,000.00 65,000,000.00
3 Septi Tank Bio Master kap. 4 m3 lengkap terpasang unit 1.00 22,500,000.00 22,500,000.00
Sub Total 90,500,000.00
2,381,933,300.00
B 1 INDETIFIKASI BAHAYA,PENILAIAN RISIKO, PENGENDALIAN DAN PELUANG

TABEL 1. IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENETAPAN PENGENDALIAN RISIKO K3

Nama Perusahaan : PT. SIRARA AGUNG JAYA


Kegiatan : BELANJA PEMELIHARAAN GEDUNG DAN BANGUNAN ( BIAYA KONTRUKSI REVITALISASI KAMAR INAP GRAHA AMERTA )
Lokasi : RSUD DR. SOETOMO JAWA TIMUR
Tanggal Dibuat : Jakrta 23 Mei 2019
PENILAIAN RESIKO SKALA PENETAPAN
NO JENIS /TYPE PEKERJAAN IDENTIFIKASI BAHAYA DAMPAK
KEKERAPAN KEPARAHAN TINGKAT RESIKO PRIORITAS PENGENDALIAN RESIKO K3
1 2 3 4 5 6 7 8 9
1 Nihil Kecelakaan 3 2 4 1
Membuat dinding penutupan area supaya Tidak
Menimbulkan Kebisingan Terhadap Kamar Inap ada suara bising Menggunakan APD dan
PEKERJAAN PEMBONGKARAN Pasien Peralatan Yang sesuai
KERAMIK,DINDING DAN PLAFOND
Menggunakan metode Pekerjaan pembongkaran
yang benar Memasang rambu dan barikade dan
papa informasi

Membuat dinding penutupan area kerjaan dan


2 Menimbulkan Bau lem yang sangat menyengat Nihil Kecelakaan 2 2 4 1 melakukan Pemasangan Pada jam yang telah di
PEKERJAAN PEMASANGAN HPL DAN
WALLPAPER sepaktin bersama
Menggunakan APD sesuai
Melakukan pelatihan kerja

3 Membuat dinding penutupan area Pekerjaan


Menimbulkan Kebisingan yang disebabkan oleh Pekerjaan Nihil Kecelakaan 2 2 4 1
supaya Tidak ada suara bising Menggunakan
PEKERJAAN PEMASANGAN SANITAIR Pengeboran dinding dan lantai
APD dan Peralatan Yang sesuai dan Bekerja Pada
Jam yang telah disepakatin
Melakukan pelatihan kerja
Memasang rambu dan barikade
Menggunakan metode pemasangan Sanitair

4 PEKERJAAN PEMASANGAN Menimbulkan Kebisingan yang disebabkan oleh Pekerjaan Nihil Kecelakaan 2 2 4 1
PARTISI Pengeboran dinding dan lantai Membuat dinding penutupan area Pekerjaan
supaya Tidak ada suara bising Menggunakan
APD dan Peralatan Yang sesuai dan Bekerja Pada
Jam yang telah disepakatin
Melakukan pelatihan kerja
Memasang rambu dan barikade
Menggunakan metode pemasangan Partisi

5 Nihil Kecelakaan 2 1 2 1 Menggunakan APD sesuai


PEKERJAAN PEMASANGAN LIFT
KERJA Memasang rambu dan barikade
Terjadi Kontruksi pengait terhadap struktur bangunan yang Melakukan pelatihan kerja
ada Serta Pemasangan pondasi yang kurang Stabil dan
memadai Sehingga akan Menimbulkan Bahaya Roboh Menggunakan metode yang sesuai
memastikan kontruksi tempat pengait nya yang
harus benar2 kuat dan cocok supaya aman

PT. SIRARA AGUNG JAYA

SUBAGIO
Direktur Utama
B2 RENCANA TINDAKAN ( SSARAN & PROGRAM )

TABEL PENYUSUNAN SASARAN DAN PROGRAM K3


Nama Perusahaan : PT. SIRARA AGUNG JAYA
Kegiatan : BELANJA PEMELIHARAAN GEDUNG DAN BANGUNAN ( BIAYA KONTRUKSI REVITALISASI KAMAR INAP GRAHA AMERTA )
Lokasi : RSUD DR. SOETOMO JAWA TIMUR
Tanggal Dibuat : Jakrta 23 Mei 2019

SASARAN KHUSUS PROGRAM


NO JENIS /TYPE PEKERJAAN PENGENDALIAN RESIKO INDIKATOR MONITORI
URAIAN TOLAK UKUR SUMBER DAYA JANGKA WAKTU PENANGGUNG JAWAB
PENCAPAIAN NG
1 2 3 5

Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
1 instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
PEKERJAAN PEMBONGKARAN
3. Alat-alat APD
KERAMIK,DINDING DAN PLAFOND

2 PEKERJAAN PEMASANGAN HPL Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
DAN WALLPAPER instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Pemasangan HPL dan Wapaper 3. Alat-alat APD

3 PEKERJAAN PEMASANGAN
SANITAIR Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Pemasangan Sanitair 3. Alat-alat APD

4 Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
PEKERJAAN PEMASANGAN
instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
PARTISI
Pemasangan Partisi 3. Alat-alat APD

5 PEKERJAAN PEMASANGAN Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
LIFT KERJA instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Galian dan pengecoran 3. Alat-alat APD

PT. SIRARA AGUNG JAYA

SUBAGIO
Direktur Utama