I PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
PEKERJAAN PASANGAN lt. 1 842,698,984.80
PEKERJAAN PASANGAN lt. 2 706,085,396.00
C PEKERJAAN PLAFOND
PEKERJAAN PLAFOND LT.1 124,120,374.75
PEKERJAAN PLAFOND LT.2 74,580,980.32
D PEKERJAAN PENGECATAN
PEKERJAAN PENGECATAN lt.1 199,216,245.45
PEKERJAAN PENGECATAN lt.2 82,841,797.83
F PEKERJAAN SANITARY
PEKERJAAN SANITARY LT. 1 62,250,000.00
PEKERJAAN SANITARY LT. 2 23,142,000.00
JUMLAH #REF!
PPN 10 % #REF!
PENYAMBUNGAN DAYA 105 Kva 96,875,000.00
JUMLAH TOTAL #REF!
DIBULATKAN #REF!
Tebilang : Sebelas Milyar Seratus Tujuh Puluh Lima Juta Rupiah
REFRIANI ROESLAI
Kepala Cabang
RENCANA ANGGARAN BIAYA ( RAB )
PEMBANGUNAN GEDUNG KANTOR TASPEN (Persero)
CABANG DEPOK
TAHUN ANGGARAN 2015
B. PEKERJAAN ARSITEKTUR
I PEKERJAAN ARSITEKTUR
A PEKERJAAN PASANGAN
PEKERJAAN PASANGAN lt. 1
1 Pek. Dinding 1/2 bata ad. 1:4 1,439.04 m2 117,449.20
2 Pek. Plesteran ad. 1pc : 4 ps, tebal 15 mm 2,878.07 m2 63,014.16
3 Pek. Acian 2,878.07 m2 50,520.80
4 Pek. Dinding kaca T. 12 cm 28.00 m2 1,377,203.52
5 Pek. Dinding Alcubon Panel ( ACP) 195.75 m2 937,203.52
6 Pek. Dinding partisi double gypsum 9 mm rk. Besi hollow 207.40 m2 179,700.22
7 Pek. Panel backdrop rangka hollow 20x40 + 58.50 m2 435,205.47
multiplak t. 12 mm panel backdrop finish duco (counter)
8 Pek. Panel backdrop rangka hollow 20x40 + 10.20 m2 435,205.47
multiplak t. 12 mm panel backdrop finish duco customer service)
9 Pek. Meja wastafel 0.39 m3 4,200,000.00
10 Pek. Plint kayu 2x10 cm 312.76 m1 30,000.00
11 Pek. Dinding keramik uk. 30x60 cm km/wc 204.00 m2 228,993.60
SUB. TOTAL
PEKERJAAN PASANGAN lt. 2
1 Pek. Dinding 1/2 bata ad. 1:4 597.89 m2 117,449.20
2 Pek. Plesteran ad. 1pc : 4 ps, tebal 15 mm 1,195.77 m2 63,014.16
3 Pek. Acian 1,195.77 m2 50,520.80
4 Pek. Dinding kaca T. 12 cm 113.30 m2 1,377,203.52
5 Pek. Dinding Alcubon Panel ( ACP) 282.75 m2 937,203.52
6 Pek. Dinding partisi double gypsum 9 mm rk. Besi hollow 208.03 m2 179,700.22
7 Pek. Dinding panel multiplek 9+4 mm finish HPL 48.00 m2 435,205.47
8 Pek. Meja wastafel 0.29 m3 4,200,000.00
9 Pek. Plint kayu 2x10 cm 231.00 m1 30,000.00
10 Pek. Dinding keramik uk. 30x60 cm km/wc 55.20 m2 228,993.60
SUB. TOTAL
SUB. TOTAL
C PEKERJAAN PLAFOND
PEKERJAAN PLAFOND LT.1
1 Pek. plafond gypsum board t. 9 mm rangka besi hollow 801.50 m2 131,777.80
2 Pek. Drop celing 42.00 m2 131,777.80
3 Pek. Plafond multiplek 9 mm finish HPL 15.64 m2 380,000.00
4 Pek. list plafond gypsum uk. 10 cm 312.76 m1 22,453.64
SUB. TOTAL
D PEKERJAAN PENGECATAN
PEKERJAAN PENGECATAN lt.1
1 Pengecatan dinding 3 lapis setara Dulux ICI 2,878.07 m2 42,702.88
2 Pengecatan plafond 3 lapis setara Dulux ICI 859.14 m2 42,702.88
3 Wall Paper 562.95 m2 70,391.20
SUB. TOTAL
F PEKERJAAN SANITARY
PEKERJAAN SANITARY LT. 1
1 Closet duduk 8.00 bh 3,250,000.00
2 Jet spray 8.00 bh 320,000.00
3 Wastafel 5.00 bh 2,200,000.00
4 Floor drain 9.00 bh 126,000.00
5 Kaca cermin 8.40 m2 140,000.00
6 Shower lengkap dengan kran 8.00 bh 1,600,000.00
7 Kran air 18.00 bh 150,000.00
8 Tempat tisue 8.00 bh 185,000.00
9 Tempat sabun 8.00 bh 75,000.00
10 Gantungan handuk 8.00 bh 350,000.00
SUB. TOTAL
b PEKERJAAN ARSITEKTUR
1 Pek. Dinding 1/2 bata ad. 1:4 84.74 m2 117,449.20
2 Pek. Plesteran dan acian 169.47 m2 113,534.96
3 Pek. Lantai keramik 60x60 20.60 m2 376,600.00
4 Pek. Plint 10x60 32.70 m1 81,946.37
5 Pek. Profilan lis beton 22.21 m1 75,000.00
6 Pek. Finishing batu alam 38.40 m2 360,000.00
7 Pek. Kusen pintu aluminium 5/10 powder coating 2.00 bh 2,750,000.00
8 Pek. Kusen pintu frameless atm 1.00 bh 6,000,000.00
9 Pek. Kusen jendela j1 1.00 bh 1,500,000.00
10 Pek. Kusen jendela sudut 1.00 bh 250,000.00
11 Pek. Plafon Gypsum 9mm 20.60 m2 131,777.80
12 Pek. Pengecatan dinding 104.64 m2 42,702.88
13 Pek. Pengecatan plafon 20.60 m2 42,702.88
14 Water proofing dak beton 30.24 m2 130,000.00
b PEKERJAAN ARSITEKTUR
1 Pek. Dinding 1/2 bata ad. 1:4 298.00 m2 117,449.20
2 Pek. Plesteran dan acian 596.00 m2 113,534.96
3 Pek. Jalusi hollow 4x4, 4x2 3.00 bh 550,000.00
4 Pek. Lantai floor beton 64.91 m2 275,000.00
NO URAIAN PEKERJAAN VOL SAT HARGA SATUAN
b PEKERJAAN ARSITEKTUR
1 Pek. Pasangan batu andesit 12.80 m2 360,000.00
2 Pek. Plesteran dan acian 10.08 m2 113,534.96
3 Pek. Pengecatan dinding 10.08 m2 42,702.88
SUB. TOTAL
169,013,744.42
181,359,415.53
145,402,600.94
38,561,698.56
183,457,589.04
37,269,826.46
25,459,519.71
4,439,095.75
1,638,000.00
9,382,800.00
46,714,694.40
842,698,984.80
70,221,114.94
75,350,442.10
60,411,257.02
156,037,158.82
264,994,295.28
37,382,318.80
20,889,862.33
1,228,500.00
6,930,000.00
12,640,446.72
706,085,396.00
216,168,400.00
78,340,248.80
2,774,000.00
4,362,664.68
29,977,360.00
5,703,467.35
337,326,140.83
143,409,280.00
2,199,840.61
JUMLAH HARGA
145,609,120.61
105,619,906.70
5,534,667.60
5,943,200.00
7,022,600.45
124,120,374.75
64,571,122.00
4,823,067.48
5,186,790.84
74,580,980.32
122,902,048.65
36,687,752.32
39,626,444.48
199,216,245.45
51,062,822.82
22,487,336.61
9,291,638.40
82,841,797.83
48,245,000.00
12,057,440.00
22,657,920.00
19,723,900.00
4,441,360.00
12,874,000.00
3,681,020.00
5,077,645.00
12,648,135.00
11,181,100.00
4,843,965.00
1,991,860.00
159,423,345.00
16,993,440.00
14,088,500.00
8,882,720.00
8,432,090.00
29,070,860.00
691,995.00
78,159,605.00
JUMLAH HARGA
JUMLAH HARGA
26,000,000.00
2,560,000.00
11,000,000.00
1,134,000.00
1,176,000.00
12,800,000.00
2,700,000.00
1,480,000.00
600,000.00
2,800,000.00
62,250,000.00
9,750,000.00
960,000.00
4,400,000.00
504,000.00
448,000.00
4,800,000.00
450,000.00
555,000.00
225,000.00
1,050,000.00
23,142,000.00
24,772,000.00
22,880,000.00
2,400,000.00
31,900,000.00
2,500,000.00
60,000,000.00
1,276,600.00
4,000,000.00
500,000.00
32,493,500.00
16,125,000.00
24,948,000.00
5,000,000.00
66,614,400.00
25,680,000.00
321,089,500.00
2,816,324.12
255,240.03
1,016,820.00
8,808,562.77
1,105,822.50
JUMLAH HARGA
5,332,978.80
6,938,820.00
5,394,436.92
16,569,463.68
9,952,057.96
19,240,769.67
7,757,960.00
2,679,646.30
1,665,750.00
13,824,000.00
5,500,000.00
6,000,000.00
1,500,000.00
250,000.00
2,714,622.68
4,468,429.36
879,679.33
3,931,200.00
1,260,000.00
1,758,000.00
1,512,000.00
326,000.00
270,000.00
138,000.00
1,260,000.00
135,126,584.12
1,034,035.20
8,476,800.00
12,159,456.00
8,738,755.20
16,849,872.00
2,916,324.00
37,657,872.00
7,824,168.00
5,589,621.00
15,084,000.00
15,084,000.00
4,479,600.00
7,629,120.00
-
-
34,999,861.60
67,666,836.16
1,650,000.00
17,850,250.00
JUMLAH HARGA
25,450,916.48
JUMLAH HARGA
9,000,000.00
5,000,000.00
6,000,000.00
2,075,985.00
-
-
586,000.00
1,728,000.00
90,000.00
276,000.00
3,600,000.00
319,497,472.64
595,604.28
75,907.81
4,320,480.00
145,266.40
4,050,450.00
10,304,344.80
58,125,000.00
-
-
4,608,000.00
1,144,432.40
430,445.03
83,799,930.72
2,791,895.04
506,052.10
8,732,156.40
5,500,000.00
5,184,576.00
4,455,495.00
5,050,315.60
9,764,006.56
12,121,200.00
17,000,000.00
3,672,447.68
-
-
20,939,212.80
3,795,390.72
45,116,141.40
38,884,320.00
19,442,160.00
42,281,712.00
81,745,171.20
JUMLAH HARGA
30,746,073.60
357,728,326.10
32,248,000.00
25,580,323.30
7,558,125.00
195,621,406.75
38,830,714.56
3,859,000.00
303,697,569.61
7,841,433.60
567,446.88
2,098,666.57
21,875,000.00
28,610,625.12
27,657,116.26
168,437.50
7,500,000.00
96,318,725.93
4,963,368.96
24,302,700.00
6,166,083.00
5,960,585.40
4,758,048.00
3,568,536.00
13,449,240.00
2,700,000.00
3,375,000.00
831,250.46
70,074,811.82
2,585,088.00
221,397.79
96,000.00
-
16,575,800.00
40,256,950.00
14,091,054.75
-
2,660,044.80
4,820,659.20
1,428,940.80
254,475.00
572,175.00
6,376,500.00
520,200.00
85,000.00
90,544,285.34
JUMLAH HARGA
13,787.14
18,449.82
99,000.00
176,224.00
211,408.56
442,786.34
69,272.00
-
522,675.00
381,600.00
534,000.00
300,000.00
85,000.00
125,160.00
2,979,362.86
25,850.88
4,941.92
4,000.00
1,620,180.00
91,963.32
51,243.46
2,244.84
1,638,000.00
1,120,000.00
1,200,000.00
130,000.00
90,000.00
180,000.00
6,158,424.41
297,802.14
37,953.91
2,160,240.00
72,633.20
1,080,120.00
951,609.60
17,806,866.88
22,407,225.73
RENCANA ANGGARAN BIAYA
PEKERJAAN PEMBANGUNAN GEDUNG KANTOR PT. TASPEN (PERSERO)
CABANG DEPOK
I PEKERJAAN ELEKTRIKAL
1.a PEK. Panel Tegangan Menengah
- Panel Tegangan Menengah, Incoming, Metering, Arrester, 1x Outgoing set 1.00 22,500,000.00 22,500,000.00
- Trafo 105 Kva unit 1.00 68,000,000.00 68,000,000.00
- Grounding, PTM, Trafo, & MDP unit 1.00 2,500,000.00 2,500,000.00
b PEK. Kabel Utama -
- Dari PTM ke Trafo N2XSY 3 x 1 x 35 mm bh 25.00 320,000.00 8,000,000.00
- Dari Trafo ke MDP NYY 4x95 mm bh 20.00 415,000.00 8,300,000.00
- Material bantu breket Conector dll ls 1.00 3,500,000.00 3,500,000.00
Sub Total 112,800,000.00
3 Pek. Penangkal petir & Grounding Perangkat lunak set 1.00 60,000,000.00 60,000,000.00
1 - EF atau Prefextor radius R 80
- Coaxial kabel 70 mm2
- Conecting Slove + Tiang Galvanis 6 meter
- Cooper Root
- Grounding + Box Control ukuran 40 x 40 x 40 cm
- Biaya Instalasi
2 Pek. Grounding untuk perangkat lunak dan ups set 1.00 5,000,000.00 5,000,000.00
Sub Total 65,000,000.00
16 Pek Lain Lain
1 Pek. Water torn kap 1000 liter unit 2.00 1,500,000.00 3,000,000.00
2 Septi Tank Bio Master kap. 7 m3 lengkap terpasang unit 1.00 65,000,000.00 65,000,000.00
3 Septi Tank Bio Master kap. 4 m3 lengkap terpasang unit 1.00 22,500,000.00 22,500,000.00
Sub Total 90,500,000.00
2,381,933,300.00
B 1 INDETIFIKASI BAHAYA,PENILAIAN RISIKO, PENGENDALIAN DAN PELUANG
4 PEKERJAAN PEMASANGAN Menimbulkan Kebisingan yang disebabkan oleh Pekerjaan Nihil Kecelakaan 2 2 4 1
PARTISI Pengeboran dinding dan lantai Membuat dinding penutupan area Pekerjaan
supaya Tidak ada suara bising Menggunakan
APD dan Peralatan Yang sesuai dan Bekerja Pada
Jam yang telah disepakatin
Melakukan pelatihan kerja
Memasang rambu dan barikade
Menggunakan metode pemasangan Partisi
SUBAGIO
Direktur Utama
B2 RENCANA TINDAKAN ( SSARAN & PROGRAM )
Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
1 instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
PEKERJAAN PEMBONGKARAN
3. Alat-alat APD
KERAMIK,DINDING DAN PLAFOND
2 PEKERJAAN PEMASANGAN HPL Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
DAN WALLPAPER instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Pemasangan HPL dan Wapaper 3. Alat-alat APD
3 PEKERJAAN PEMASANGAN
SANITAIR Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Pemasangan Sanitair 3. Alat-alat APD
4 Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
PEKERJAAN PEMASANGAN
instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
PARTISI
Pemasangan Partisi 3. Alat-alat APD
5 PEKERJAAN PEMASANGAN Melakukan pelatihan kepada pekerja Tersedia Metode dan Lulus test dan paham mengenai 1. Rambu-rambu, Barikade Sebelum kerja 100% sesuai standart Cheklist Site Manager dan TA K3
LIFT KERJA instruksi kerja system keselamatan pekerjaan 2. SDM sesuai kebutuhan harus lengkap
Galian dan pengecoran 3. Alat-alat APD
SUBAGIO
Direktur Utama