Anda di halaman 1dari 57

REKAPITULASI BIAYA

PEKERJAAN : PEMBANGUNAN RUKO


LOKASI : INDONESIA
THN. ANGG : 2015

NO. .............URAIAN PEKERJAAN............... JUMLAH


A PEKERJAAN PERSIAPAN Rp 68,358,670.16
B PEKERJAAN TANAH, PASIR & PAS. BATU KALI Rp 28,496,040.94
C PEKERJAAN BETON
C.1. BETON SUB STRUCTURE (Elv < +0.00) Rp 377,314,955.73
C.2. BETON UPPER STRUCTURE (Elv +0.00 - +4.00) Rp 891,382,335.70
C.3. BETON UPPER STRUCTURE (Elv +4.00 - +8.00) Rp 1,660,497,861.84
C.4. BETON UPPER STRUCTURE (Elv +8.00 - +12.00) Rp 445,337,878.79
C.5. BETON TANGGA Rp 110,409,884.42
D PEKERJAAN ATAP Rp 608,124,128.85
E PEKERJAAN PASANGAN DINDING Rp 1,130,280,518.36
F PEKERJAAN PLAFOND Rp 577,010,752.25
G PEKERJAAN KUSEN, PINTU, JENDELA & KACA Rp 806,581,705.94
H PEKERJAAN LANTAI Rp 748,291,510.32
I PEKERJAAN SANITAIR Rp 44,664,174.60
J PEKERJAAN PENGECATAN Rp 252,882,929.89
K PEKERJAAN MEKANIKAL
K.1. PENYEDIAAN DAN SUPLAI AIR BERSIH Rp 41,478,903.60
K.2. INSTALASI PIPA AIR BERSIH Rp 13,594,179.10
K.3. INSTALASI PIPA AIR BEKAS, AIR KOTOR & VENT Rp 60,122,599.50
K.4. INSTALASI DRAINASI AIR HUJAN Rp 7,556,498.90
K.5. PEKERJAAN TATA UDARA Rp 17,024,500.00
L PEKERJAAN ELEKTRIKAL
L.1. PENYEDIAAN & DISTRIBUSI LISTRIK Rp 15,750,000.00
L.2. INSTALASI PANEL TEGANGAN RENDAH Rp 32,675,000.00
L.3. INSTALASI KABEL TOEVOER Rp 8,120,000.00
L.4. INSTALASI PENERANGAN Rp 200,473,565.00
L.5. INSTALASI KABEL TRAY & LADDER Rp 21,810,000.00
M PEKERJAAN LAIN-LAIN/PENDUKUNG
M.1. PEK. SALURAN KELILING Rp 56,849,443.85
M.2. PEK. GROUND TANK KAP ±15 M3 Rp 32,773,823.59
M.3. PEK. HALAMAN PARKIR Rp 52,870,144.15
TOTAL Rp 8,310,732,005.49
KEUNTUNGAN DAN OVERHEAD Rp 581,751,240.38
PPN (10%) Rp 889,248,324.59
TOTAL FISIK Rp 9,781,731,570.46
DIBULATKAN Rp 9,781,731,000.00

Terbilang : DUA BELAS MILYAR SEMBILAN BELAS JUTA TUJUH RATUS TUJUH PULUH DUA RIBU RUPIAH
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
A PEKERJAAN PERSIAPAN
1 Pek. Administrasi dan Dokumentasi 1 Ls 10,000,000 10,000,000
2 Pek. Pengadaan air kerja 1 Ls 1,500,000 1,500,000
3 Pek. Pengadaan listrik kerja 1 Ls 2,600,000 2,600,000
4 Pek. Pasangan bouwplank 216 m1 66,389 14,339,929
5 Pek. Papan nama proyek 1 ls 180,000 180,000
6 Pek. Pengukuran/setting out 1 Ls 5,000,000 5,000,000
7 Pek. Mob dan Demob 1 Ls 12,000,000 12,000,000
8 Pek. Direksi keet 12 m2 450,000 5,400,000
9 Pek. Gudang dan barak kerja 36 m2 481,632 17,338,741
SUB TOTAL 68,358,670
B PEK. TANAH, PASIR & PAS. BATU KALI
1 Pek. Galian tanah pile cap 187 m3 41,125 7,698,600
2 Pek. Galian tanah pondasi tiang pancang 9 m3 41,125 353,307
3 Pek. Galian tanah pondasi batu kali 5 m3 41,125 192,465
4 Pek. Urugan tanah kembali 128 m3 13,708 1,750,445
5 Pek. Urugan pasir 11 m3 143,170 1,600,068
6 Pek. Pasangan pondasi batu kali 27 m3 619,090 16,901,157
SUB TOTAL 28,496,041
C PEKERJAAN BETON
C.1. BETON SUB STRUCTURE (Elv < +0.00)
1 Pek. Lantai kerja pile cap dan tie beam 37 m3 758,219 27,989,823
2 Pek. Lantai kerja sloof 8 m3 758,219 5,871,651
3 Pek. Bore Pile Dia. 40 cm 274 m1 285,000 77,976,000
4 Pek. Beton Bored Pile 34 m3 2,556,479 87,851,254
5 Pek. Beton Pile Cap PC1 20 unit 3,281,457 65,629,130
6 Pek. Pondasi tiang 2 unit 644,944 1,289,888
7 Pek. Pondasi tiang 1 unit 615,941 615,941
8 Pek. Kolom K1=60/60 11 m3 5,598,369 60,462,389
9 Pek. Balok Sloof TB1=20/25 cm 7 m3 4,903,522 32,216,142
10 Pek. Rabat beton di bawah lantai 1 23 m3 758,219 17,412,737
SUB TOTAL 377,314,956
C.2. BETON UPPER STRUCTURE (Elv +0.00 - +3.25)
1 Pek. Kolom K1 = 60/60 23 m3 5,598,369 131,001,842
2 Pek. Kolom Praktis 20/20 2 m3 6,258,129 10,576,238
3 Pek. Balok Lantai 4 m3 5,584,493 20,003,652
4 Pek. Balok Lantai B1 46 m3 5,174,432 240,145,367
5 Pek. Balok Lantai B2 18 m3 5,967,861 105,410,330
6 Pek. Balok Lantai B3 5 m3 7,501,101 36,005,284
7 Pek. Balok Lantai B4 3 m3 5,525,342 17,957,362
8 Pek. Balok Lantai B5 10 m3 6,557,676 66,101,378
9 Pek. Balok Lantai B6 24 m3 5,863,465 140,107,484
10 Pek. Beton Plat Lantai 23 m3 4,954,563 114,793,762
11 Pek. Plat Topian 2 m3 4,957,070 9,279,635
SUB TOTAL 891,382,336
C.3. BETON UPPER STRUCTURE (Elv +3.25 - + 16.25)
1 Pek. Kolom K1 = 60/60 94 m3 5,598,369 524,007,368
2 Pek. Kolom Praktis 20/20 7 m3 6,258,129 42,304,951
3 Pek. Balok Lantai 4 m3 5,584,493 20,003,652
4 Pek. Balok Lantai B1 46 m3 5,174,432 240,145,367
5 Pek. Balok Lantai B2 18 m3 5,967,861 105,410,330
6 Pek. Balok Lantai B3 5 m3 7,501,101 36,005,284
7 Pek. Balok Lantai B4 3 m3 5,525,342 17,957,362
8 Pek. Balok Lantai B5 10 m3 6,557,676 66,101,378
9 Pek. Balok Lantai B6 24 m3 5,863,465 140,107,484
10 Pek. Beton Plat Lantai 93 m3 4,954,563 459,175,050
11 Pek. Plat Topian 2 m3 4,957,070 9,279,635
SUB TOTAL 1,660,497,862
C.4. BETON UPPER STRUCTURE (Elv +16.25 - +19.50)
1 Pek. Kolom K1' = 60/60 23 m3 5,120,407 119,817,524
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
2 Pek. Kolom Praktis 20/20 2 m3 6,258,129 10,576,238
3 Pek. Balok Lantai 4 m3 5,584,493 20,003,652
4 Pek. Balok Dak B7 8 m3 6,824,422 51,319,657
5 Pek. Balok Dak B8 1 m3 7,694,860 5,540,299
6 Pek. Balok R1 25 m3 6,185,115 153,390,859
7 Pek. Balok R2 3 m3 5,659,028 18,335,251
8 Pek. Beton Plat Dak 12 m3 4,954,563 60,643,854
9 Pek. Plat Topian 1 m3 4,957,070 5,710,545
SUB TOTAL 445,337,879
C.5. BETON TANGGA
1 Pek. Plat tangga 12 m3 4,741,493 56,584,983
2 Pek. Balok bordes B8 1 m3 7,694,860 9,233,832
3 Pek. Plat bordes 9 m3 4,954,563 44,591,069
SUB TOTAL 110,409,884
PEKERJAAN ATAP
1 Pek. Rangka atap dan perakitan 15,578 kg 30,801 479,826,935
D 2 Pek. Pasangan Listplank 415 m1 61,568 25,562,888
3 Pek. Pasangan Atap 2,225 m2 39,291 87,440,771
4 Pek. Pasangan Nok/Bubungan 238 m1 64,178 15,293,534
SUB TOTAL 608,124,129
PEKERJAAN PASANGAN DINDING
1 Pasangan 1/2 bata 1:4 lantai 1-2 1,583 m2 101,521 160,720,149
E 2 Pasangan 1/2 bata 1:4 lantai 3-4 1,445 m2 101,521 146,694,077
3 Pasangan 1/2 bata 1:4 lantai 4-5 1,306 m2 101,521 132,567,499
4 Pasangan plesteran dinding dan beton lantai 1-2 3,230 m2 54,395 175,673,004
5 Pasangan plesteran dinding dan beton lantai 3-4 2,948 m2 54,395 160,342,317
6 Pasangan plesteran dinding dan beton lantai 5-6 2,664 m2 54,395 144,901,753
7 Pasangan acian dinding dan beton lantai 1-2 3,230 m2 23,683 76,484,528
8 Pasangan acian dinding dan beton lantai 3-4 2,948 m2 23,683 69,809,853
9 Pasangan acian dinding dan beton lantai 5-6 2,664 m2 23,683 63,087,338
SUB TOTAL 1,130,280,518
PEKERJAAN PLAFOND
1 Pasangan plafond + rangka kayu lantai 1-2 1,256 m2 125,532 157,614,314
F 2 Pasangan plafond + rangka kayu lantai 3-4 1,292 m2 125,532 162,137,235
3 Pasangan plafond + rangka kayu lantai 5-6 1,634 m2 125,532 205,159,589
4 Pasangan list plafond lantai 1-2 879 m1 18,575 16,317,698
5 Pasangan list plafond lantai 3-4 832 m1 18,575 15,453,984
6 Pasangan list plafond lantai 5-6 1,094 m1 18,575 20,327,933
SUB TOTAL 577,010,752
PEK. KUSEN, PINTU, JENDELA & KACA
Lantai 1-2
G 1 Kusen dan Pintu Type PD1 1 Unit 6,287,326 6,287,326
2 Kusen dan Pintu Type P1 12 Unit 3,783,533 45,402,391
3 Kusen dan Pintu Type P2 2 Unit 3,298,104 6,596,207
4 Kusen dan Pintu Type P3 2 Unit 2,770,095 5,540,190
5 Kusen dan Pintu Type P4 13 Unit 2,474,430 32,167,584
6 Kusen dan Pintu Type P5 2 Unit 844,391 1,688,782
7 Kusen Jendela Type J1 29 Unit 2,859,949 82,938,520
8 Kusen Jendela Type J2 18 Unit 1,446,318 26,033,730
9 Kusen Jendela Type J4 40 Unit 487,860 19,514,400
10 Kusen Jendela Type J6 8 Unit 898,247 7,185,974
11 Kusen Jendela Type J7 6 Unit 365,281 2,191,688
12 Pasangan GB 4 Unit 820,000 3,280,000
13 Pasangan pintu teralis (PR) 17 m2 580,913 9,939,421
14 Pasangan R2 12 m2 580,913 7,214,939
15 Railing tangga type 1 18 m1 720,000 12,672,000
16 Railing tangga type 2 17 m1 720,000 12,528,000

Lantai 3-4
1 Kusen dan Pintu Type P1 14 Unit 3,783,533 52,969,456
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
2 Kusen dan Pintu Type P3 4 Unit 2,770,095 11,080,379
3 Kusen dan Pintu Type P4 8 Unit 2,474,430 19,795,436
4 Kusen dan Pintu Type P5 2 Unit 844,391 1,688,782
5 Kusen Jendela Type J1 32 Unit 2,859,949 91,518,367
6 Kusen Jendela Type J2 18 Unit 1,446,318 26,033,730
7 Kusen Jendela Type J3 4 Unit 2,952,831 11,811,324
8 Kusen Jendela Type J4 52 Unit 487,860 25,368,720
9 Kusen Jendela Type J5 4 Unit 1,139,401 4,557,604
10 Kusen Jendela Type J6 8 Unit 898,247 7,185,974
11 Pasangan GB 4 Unit 820,000 3,280,000
12 Pasangan R1 6 Unit 580,913 3,607,470
13 Railing tangga type 1 18 m1 720,000 12,672,000
14 Railing tangga type 2 17 m1 720,000 12,528,000
Lantai 5-6
1 Kusen dan Pintu Type PD2 1 Unit 5,869,294 5,869,294
2 Kusen dan Pintu Type P1 10 Unit 3,783,533 37,835,326
3 Kusen dan Pintu Type P3 2 Unit 2,770,095 5,540,190
4 Kusen dan Pintu Type P4 4 Unit 2,474,430 9,897,718
5 Kusen dan Pintu Type P5 2 Unit 844,391 1,688,782
6 Kusen Jendela Type J1 32 Unit 2,859,949 91,518,367
7 Kusen Jendela Type J2 24 Unit 1,446,318 34,711,640
8 Kusen Jendela Type J3 4 Unit 2,952,831 11,811,324
9 Kusen Jendela Type J4 36 Unit 487,860 17,562,960
10 Kusen Jendela Type J5 10 Unit 1,139,401 11,394,009
11 Kusen Jendela Type J6 15 Unit 898,247 13,473,701
SUB TOTAL 806,581,706
PEKERJAAN LANTAI
1 Pas. Keramik lantai 40/40 elv +0.00 1,146 m2 180,070 206,360,220
H 2 Pas. Keramik lantai 20/20 84 m2 184,785 15,516,396
3 Pas. Keramik dinding 20/25 216 m2 154,477 33,319,809
4 Pas. Batu tempel 65 m2 335,243 21,723,714
5 Pas. Keramik lantai 40/40 elv +4.00 1,134 m2 180,070 204,199,380
6 Pas. Keramik lantai 20/20 36 m2 184,785 6,652,260
7 Pas. Keramik dinding 20/25 117 m2 154,477 18,120,093
8 Pas. Keramik lantai 40/40 elv +8.00 1,119 m2 180,070 201,498,330
9 Pas. Keramik lantai 20/20 12 m2 184,785 2,217,420
10 Pas. Keramik dinding 20/25 44 m2 154,477 6,719,728
11 Pas. Keramik tangga elv +0.00 s/d +8.00 192 m2 166,480 31,964,160
SUB TOTAL 748,291,510
PEKERJAAN SANITAIR
Lantai Dasar
I 1 Pas. Closet duduk 2 Unit 3,302,534 6,605,068
2 Pas. Urinoir 3 Unit 3,847,060 11,541,180
3 Pas. Kran Air 2 Buah 83,180 166,360
4 Pas. Wastavel 3 Unit 1,423,190 4,269,570
Lantai 1-4
1 Pas. Closet duduk 2 Unit 3,302,534 6,605,068
2 Pas. Urinoir 3 Unit
3 Pas. Kran Air 2 Buah 83,180 166,360
4 Pas. Wastavel 3 Unit 1,423,190 4,269,570
Lantai 5
1 Pas. Closet duduk 2 Unit 3,302,534 6,605,068
2 Pas. Urinoir 3 Unit
3 Pas. Kran Air 2 Buah 83,180 166,360
4 Pas. Wastavel 3 Unit 1,423,190 4,269,570
SUB TOTAL 44,664,175
PEKERJAAN PENGECATAN
1 Pek. Pengecatan dinding dan beton lantai 1-2 luar 1,111 m2 39,931 44,378,449
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
J 2 Pek. Pengecatan dinding dan beton lantai 3-4 luar 1,078 m2 39,931 43,065,108
3 Pek. Pengecatan dinding dan beton lantai 5-6 luar 1,086 m2 39,931 43,349,419
4 Pek. Pengecatan dinding dan beton lantai 1-2 dalam 2,201 m2 13,413 29,521,889
5 Pek. Pengecatan dinding dan beton lantai 3-4 dalam 2,061 m2 13,413 27,640,199
6 Pek. Pengecatan dinding dan beton lantai 5-6 dalam 1,867 m2 13,413 25,043,350
7 Pek. Pengecatan plafond dan list lantai 1-2 1,256 m2 9,538 11,976,066
8 Pek. Pengecatan plafond dan list lantai 3-4 1,292 m2 9,538 12,319,733
9 Pek. Pengecatan plafond dan list lantai 5-6 1,634 m2 9,538 15,588,716
SUB TOTAL 252,882,930
MEKANIKAL
K.1. PENYEDIAAN DAN SUPLAI AIR BERSIH
K Instalasi pompa suplai dari sumur ke groundtank
1 Pompa hisap kap. Min 65 ltr/mnt 1 unit 15,250,000 15,250,000
2 Gate valve dia.32mm 2 unit 150,000 300,000
3 Fleksible joint dia.32mm 4 bh 150,000 600,000
4 Strainer dia.32mm 2 bh 150,000 300,000
5 Check valve dia.32mm 2 bh 180,000 360,000
6 Foot valve dia.32mm 1 bh 205,000 205,000
7 Pemipaan 1 ls 320,000 320,000
8 Fiting & aksesoris 1 ls 125,000 125,000
9 Pemasangan, instalasi dan alat bantu 1 ls 75,000 75,000

Instalasi pompa transfer dari groundtank ke rooftank


1 Pompa kap. 46 ltr/mnt 1 unit 8,750,000 8,750,000
2 Gate valve dia.25mm 2 unit 150,000 300,000
3 Fleksible joint dia.25mm 4 bh 150,000 600,000
4 Strainer dia.25mm 2 bh 150,000 300,000
5 Check valve dia.25mm 2 bh 180,000 360,000
6 Foot valve dia.25mm 1 bh 205,000 205,000
7 Pemipaan 1 ls 320,000 320,000
8 Fiting & aksesoris 1 ls 125,000 125,000
9 Pemasangan, instalasi dan alat bantu 1 ls 75,000 75,000

Sumur dangkal, Tangki Air (Rooftank) dan konstruksinya


1 Pembuatan sumur dangkal (gali) 1 bh 4,500,000 4,500,000
2 Ruang pompa sumur 1 unit 1,650,000 1,650,000
3 Tangki Air kapasitas 1000 liter 2 unit 1,125,000 2,250,000
4 Instalasi pipa overflow dan penguras
- Gate valve dia.65mm 2 bh 210,000 420,000
- Pipa PVC dia.65mm 52 m 26,438 1,374,794
5 Fiting & aksesoris 1 ls 110,000 110,000

Instalasi Pemipaan Pompa Air


1 Pipa Suplai Sumur ke Groundtank PVC dim. 32mm 30 m1 17,531 525,915
2 Pipa Suplai Groundtank Ke Rooftank PVC dim. 32mm 32 m1 17,531 560,976
3 Pipa Equalisasi Rooftank 1 dan Rooftank 2
- Pipa PVC dim. 50mm 46 m1 23,200 1,067,218
- Gate valve 50mm 2 m1 170,000 340,000
4 Fitting &Aksesoris 1 ls 110,000 110,000
SUB TOTAL 41,478,904
K.2. INSTALASI PIPA AIR BERSIH
Pemipaan Pipa Tegak - Riser
1 Pipa Riser dr Rooftank 1 menuju Inst. Plambing Sayap Kanan
- Pipa PVC dim. 50mm 22 m1 23,200 510,409
- Gate valve 50mm 1 bh 170,000 170,000
- Gate valve 40mm 1 bh 150,000 150,000
- Gate valve 32mm 1 bh 150,000 150,000
- Gate valve 25mm 1 bh 150,000 150,000
2 Fitting &Aksesoris 1 ls 110,000 110,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
3 Pipa Riser dari Rooftank 2 menuju Inst. Plambing Sayap Kiri
- Pipa PVC dim. 40mm 22 m1 18,000 396,003
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
- Gate valve 40mm 1 bh 150,000 150,000
- Gate valve 32mm 1 bh 150,000 150,000
- Gate valve 25mm 2 bh 150,000 300,000
4 Fitting &Aksesoris 1 ls 110,000 110,000

Pemipaan Air Bersih Lantai 1 Sayap Kiri


1 Pipa PVC dim. 25mm 48 m1 17,296 830,230
2 Pipa PVC dim. 20mm 13 m1 24,878 323,408
3 Pipa PVC dim. 15mm 4 m1 19,453 77,810
4 Gate valve 25mm 1 bh 150,000 150,000
5 Fitting &Aksesoris 1 ls 110,000 110,000

Pemipaan Air Bersih Lantai 1 Sayap Kanan


1 Pipa PVC dim. 40mm 11 m1 18,000 198,002
2 Pipa PVC dim. 32mm 42 m1 17,531 736,281
3 Pipa PVC dim. 25mm 63 m1 17,296 1,089,676
4 Pipa PVC dim. 20mm 40 m1 24,878 995,100
5 Pipa PVC dim. 15mm 7 m1 19,453 136,168
6 Gate valve 40mm 1 bh 150,000 150,000
7 Gate valve 32mm 1 bh 150,000 150,000
8 Fitting &Aksesoris 1 ls 120,000 120,000

Pemipaan Air Bersih Lantai 2 Sayap Kiri


1 Pipa PVC dim. 25mm 48 m1 17,296 830,230
2 Pipa PVC dim. 20mm 13 m1 24,878 323,408
3 Pipa PVC dim. 15mm 4 m1 19,453 77,810
4 Gate valve 25mm 1 bh 150,000 150,000
5 Fitting &Aksesoris 1 ls 120,000 120,000

Pemipaan Air Bersih Lantai 2 Sayap Kanan


1 Pipa PVC dim. 25mm 48 m1 17,296 830,230
2 Pipa PVC dim. 20mm 13 m1 24,878 323,408
3 Pipa PVC dim. 15mm 4 m1 19,453 77,810
4 Gate valve 25mm 1 bh 150,000 150,000
5 Fitting &Aksesoris 1 ls 120,000 120,000

Pemipaan Air Bersih Lantai 3 Sayap Kiri


1 Pipa PVC dim. 32mm 5 m1 17,531 87,653
2 Pipa PVC dim. 25mm 48 m1 17,296 830,230
3 Pipa PVC dim. 20mm 13 m1 24,878 323,408
4 Pipa PVC dim. 15mm 4 m1 19,453 77,810
5 Gate valve 32mm 1 bh 150,000 150,000
6 Fitting &Aksesoris 1 ls 120,000 120,000

Pemipaan Air Bersih Lantai 3 Sayap Kanan


1 Pipa PVC dim. 32mm 5 m1 17,531 87,653
2 Pipa PVC dim. 25mm 48 m1 17,296 830,230
3 Pipa PVC dim. 20mm 13 m1 24,878 323,408
4 Pipa PVC dim. 15mm 4 m1 19,453 77,810
5 Gate valve 32mm 1 bh 150,000 150,000
6 Fitting &Aksesoris 1 ls 120,000 120,000
SUB TOTAL 13,594,179
K.3. INSTALASI PIPA AIR BEKAS, AIR KOTOR & VENT
Pemipaan Pipa Tegak - Riser
1 Pipa PVC dim. 150mm 24 m1 145,778 3,498,660
2 Pipa PVC dim. 75mm 24 m1 31,127 747,050
3 Pipa PVC dim. 75mm (vent) 36 m1 31,127 1,120,576
4 Vent Out 2 bh 90,000 180,000
5 Fitting &Aksesoris 1 ls 115,000 115,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
Pemipaan Air Bekas Kotor Lantai 1 Sayap Kiri
1 Pipa PVC dim. 150mm 13 m1 145,778 1,895,108
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
2 Pipa PVC dim. 100mm 41 m1 47,773 1,958,675
3 Pipa PVC dim. 75mm 16 m1 31,127 498,034
4 Pipa PVC dim. 65mm 28 m1 26,438 740,274
5 Pipa PVC dim. 50mm 7 m1 23,200 162,403
6 Pipa PVC dim. 32mm 4 m1 17,531 70,122
7 Floor Drain Stainless Steel 4 bh 83,005 332,020
8 Clean Out 2 bh 95,000 190,000
9 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Air Bekas Kotor Lantai 1 Sayap Kanan


1 Pipa PVC dim. 150mm 13 m1 145,778 1,895,108
2 Pipa PVC dim. 100mm 41 m1 47,773 1,958,675
3 Pipa PVC dim. 75mm 16 m1 31,127 498,034
4 Pipa PVC dim. 65mm 28 m1 26,438 740,274
5 Pipa PVC dim. 50mm 7 m1 23,200 162,403
6 Pipa PVC dim. 32mm 4 m1 17,531 70,122
7 Floor Drain Stainless Steel 4 bh 83,005 332,020
8 Clean Out 2 bh 95,000 190,000
9 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Air Bekas Kotor Lantai 1 (Musholla)


1 Pipa PVC dim. 150mm 10 m1 145,778 1,457,775
2 Pipa PVC dim. 100mm 6 m1 47,773 286,635
3 Pipa PVC dim. 75mm 36 m1 31,127 1,120,576
4 Pipa PVC dim. 65mm 6 m1 26,438 158,630
5 Pipa PVC dim. 50mm 20 m1 23,200 464,008
6 Pipa PVC dim. 40mm 4 m1 18,000 72,001
7 Floor Drain Stainless Steel 5 bh 83,005 415,025
8 Clean Out 2 bh 95,000 190,000
9 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Air Bekas Kotor Lantai 2 Sayap Kiri


1 Pipa PVC dim. 100mm 34 m1 47,773 1,624,267
2 Pipa PVC dim. 75mm 12 m1 31,127 373,525
3 Pipa PVC dim. 65mm 35 m1 26,438 925,342
4 Pipa PVC dim. 50mm 8 m1 23,200 185,603
5 Pipa PVC dim. 32mm 3 m1 17,531 52,592
6 Floor Drain Stainless Steel 4 bh 83,005 332,020
7 Clean Out 2 bh 95,000 190,000
8 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Air Bekas Kotor Lantai 2 Sayap Kanan


1 Pipa PVC dim. 100mm 34 m1 47,773 1,624,267
2 Pipa PVC dim. 75mm 12 m1 31,127 373,525
3 Pipa PVC dim. 65mm 35 m1 26,438 925,342
4 Pipa PVC dim. 50mm 8 m1 23,200 185,603
5 Pipa PVC dim. 32mm 3 m1 17,531 52,592
6 Floor Drain Stainless Steel 4 bh 83,005 332,020
7 Clean Out 2 bh 95,000 190,000
8 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Air Bekas Kotor Lantai 3 Sayap Kiri


1 Pipa PVC dim. 100mm 34 m1 47,773 1,624,267
2 Pipa PVC dim. 75mm 12 m1 31,127 373,525
3 Pipa PVC dim. 65mm 35 m1 26,438 925,342
4 Pipa PVC dim. 50mm 8 m1 23,200 185,603
5 Pipa PVC dim. 32mm 3 m1 17,531 52,592
6 Floor Drain Stainless Steel 4 bh 83,005 332,020
7 Clean Out 2 bh 95,000 190,000
8 Fitting &Aksesoris 1 ls 130,000 130,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6

Pemipaan Air Bekas Kotor Lantai 3 Sayap Kanan


1 Pipa PVC dim. 100mm 34 m1 47,773 1,624,267
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
2 Pipa PVC dim. 75mm 12 m1 31,127 373,525
3 Pipa PVC dim. 65mm 35 m1 26,438 925,342
4 Pipa PVC dim. 50mm 8 m1 23,200 185,603
5 Pipa PVC dim. 32mm 3 m1 17,531 52,592
6 Floor Drain Stainless Steel 4 bh 83,005 332,020
7 Clean Out 2 bh 95,000 190,000
8 Fitting &Aksesoris 1 ls 130,000 130,000

Pemipaan Septic Tank, Peresapan & Bak Kontrol


1 Septic Tank, Kapasitas 3,2m3 2 unit 4,500,000 9,000,000
2 Septic Tank, Kapasitas 2,4m3 2 unit 3,200,000 6,400,000
3 Sumur Peresapan, Kapasitas 2,3 m3 2 unit 1,800,000 3,600,000
4 Sumur Peresapan, Kapasitas 1,5 m3 2 unit 1,300,000 2,600,000
5 Bak Kontrol 4 unit 340,000 1,360,000
SUB TOTAL 60,122,600
K.4. INSTALASI DRAINASI AIR HUJAN
1 Pipa PVC-D dim.75mm 59 m1 31,127 1,836,499
2 Roof Drain dim.75mm 2 bh 85,000 170,000
3 Aksesoris, fitting, elbow dan alat bantu 1 ls 110,000 110,000
4 Bak kontrol 400x400mm 16 bh 340,000 5,440,000

SUB TOTAL 7,556,499


K.5. PEKERJAAN TATA UDARA
Instalasi Tata Udara Lantai 1
1 Ceiling Fan 48" 40 Watt 250 CFM termasuk instalasi 2 unit 625,000 1,250,000
2 Instalasi power dan kontrol Fan 2 titik 195,000 390,000
3 Exhaust Fan 50 Watt 13 unit 425,000 5,525,000
4 Instalasi power & kontrol exhaust fan 13 titik 105,500 1,371,500

Instalasi Tata Udara Lantai 2


1 Exhaust Fan 50 Watt 8 unit 425,000 3,400,000
2 Instalasi power & kontrol exhaust fan 8 titik 105,500 844,000

Instalasi Tata Udara Lantai 3


1 Exhaust Fan 50 Watt 8 unit 425,000 3,400,000
2 Instalasi power & kontrol exhaust fan 8 titik 105,500 844,000
SUB TOTAL 17,024,500
ELEKTRIKAL
L.1. PENYEDIAAN JARINGAN & DISTRIBUSI LISTRIK
L 1 Saluran distribusi utama dari jaringan PLN / Eksisting
- Kabel dr Power House ke SDP LP NYY 4 x 35 mm 50 m1 315,000 15,750,000
SUB TOTAL 15,750,000
L.2. INSTALASI PANEL TEGANGAN RENDAH
Box Panel - Wall mounted cubicle, steel sheet metal
(2 mm min), cat bakar, Komponen sesuai dengan
diagram satu garis pada gbr rencana,
lengkap dengan grounding panel (netral+body).
1 Panel SDP LP
- Panel Box Wall Mounted 100 X 80 X 40 CM 1 bh 6,250,000 6,250,000
- Pils lamp & fuse 3 bh 105,000 315,000
- CT 300/5A 3 bh 160,000 480,000
- Ampere meter 3 bh 180,000 540,000
- Voltmeter (0-500V) 1 bh 180,000 180,000
- Frequency Meter 1 bh 175,000 175,000
- Selector switch 1 bh 85,000 85,000
- KWH Meter 3 Phasa, Digital 1 bh 3,750,000 3,750,000
- MCCB 10 kA 3P 80 A 1 bh 800,000 800,000
- MCCB 7.5 kA 3P 40 A 3 bh 550,000 1,650,000
- MCCB 7.5 kA 3P 30 A 1 bh 550,000 550,000
- MCB 6 kA 1P 10 A 1 bh 135,000 135,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
- Busbar RSTN-GND 1 ls 450,000 450,000
- Grounding panel BC 16 MM2 1 ls 350,000 350,000
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
- Kabel, Wiring & Pemasangan 1 ls 375,000 375,000
- Material Bantu 1 ls 150,000 150,000

2 Panel LP.1 Lantai 1


- Panel Box Wall Mounted 70 X 50 X 25 CM 1 bh 2,200,000 2,200,000
- Pils lamp & fuse 3 bh 105,000 315,000
- MCCB 7.5 kA 3P 25 A 1 bh 550,000 550,000
- MCB 4.5 kA 1P 16 A 3 bh 75,000 225,000
- MCB 4.5 kA 1P 10 A 4 bh 75,000 300,000
- MCB 4.5 kA 1P 6 A 12 bh 75,000 900,000
- Busbar RSTN-GND 1 ls 205,000 205,000
- Grounding panel BC 2.5 MM2 1 ls 120,000 120,000
- Kabel, Wiring & Pemasangan 1 ls 100,000 100,000
- Material Bantu 1 ls 95,000 95,000

3 Panel LP.2 Lantai 2


- Panel Box Wall Mounted 70X 50 X 25 CM 1 bh 2,200,000 2,200,000
- Pils lamp & fuse 3 bh 105,000 315,000
- MCCB 7.5 kA 3P 25 A 1 bh 550,000 550,000
- MCB 4.5 kA 1P 16 A 3 bh 75,000 225,000
- MCB 4.5 kA 1P 10 A 5 bh 75,000 375,000
- MCB 4.5 kA 1P 6 A 12 bh 75,000 900,000
- Busbar RSTN-GND 1 ls 205,000 205,000
- Grounding panel BC 2.5 MM2 1 ls 120,000 120,000
- Kabel, Wiring & Pemasangan 1 ls 100,000 100,000
- Material Bantu 1 ls 95,000 95,000

4 Panel LP.3 Lantai 3


- Panel Box Wall Mounted 70X 50 X 25 CM 1 bh 2,200,000 2,200,000
- Pils lamp & fuse 3 bh 105,000 315,000
- MCCB 7.5 kA 3P 25 A 1 bh 550,000 550,000
- MCB 4.5 kA 1P 16 A 3 bh 75,000 225,000
- MCB 4.5 kA 1P 10 A 5 bh 75,000 375,000
- MCB 4.5 kA 1P 6 A 12 bh 75,000 900,000
- Busbar RSTN-GND 1 ls 205,000 205,000
- Grounding panel BC 2.5 MM2 1 ls 120,000 120,000
- Kabel, Wiring & Pemasangan 1 ls 100,000 100,000
- Material Bantu 1 ls 95,000 95,000

5 Panel Pompa
- Panel Box Wall Mounted 40 X 30 X 20 CM 1 bh 625,000 625,000
- MCB 4.5 kA 1P 10 A 1 bh 75,000 75,000
- MCB 4.5 kA 1P 6 A 2 bh 75,000 150,000
- Busbar RSTN-GND 1 ls 95,000 95,000
- Grounding panel BC 2.5 MM2 1 ls 120,000 120,000
- Kabel, Wiring & Pemasangan 1 ls 120,000 120,000
- Material Bantu 1 ls 75,000 75,000
SUB TOTAL 32,675,000
L.3. INSTALASI KABEL TOEVOER
1 Kabel dr Panel SDP LP ke Panel LP.1 Lt 1 NYY 4 X 16 MM 12 m1 195,000 2,340,000
2 Kabel dr Panel SDP LP ke Panel LP.1 Lt 2 NYY 4 X 16 MM 12 m1 195,000 2,340,000
3 Kabel dr Panel SDP LP ke Panel LP.1 Lt 3 NYY 4 X 16 MM 12 m1 195,000 2,340,000
4 Kabel dr P. SDP ke Panel Pompa NYY 3 X 2.5 MM 40 m1 27,500 1,100,000
SUB TOTAL 8,120,000
L.4. INSTALASI PENERANGAN
Lantai 1
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
1 Lampu TL 2x36 Watt Inbow RM 300 16 bh 225,000 3,600,000
2 Lampu TL 2x18 Watt Inbow RM 300 48 bh 190,000 9,120,000
3 Lampu Downlight 1x 11 W E27 15 bh 105,000 1,575,000
4 Lampu Downlight 1x 18 W E27 65 bh 110,000 7,150,000
5 Saklar Tunggal 30 bh 108,590 3,257,700
6 Saklar Ganda 23 bh 142,790 3,284,170
7 Saklar Tukar 4 bh 108,590 434,360
8 Instalasi penerangan 144 ttk 195,000 28,080,000
9 Outlet stopkontak, tunggal, 1ph, 10A/250VA 16 bh 199,788 3,196,600
10 Outlet stopkontak, ganda, 1ph, 16A/250VA 12 bh 199,788 2,397,450
11 Instalasi stopkontak 28 ttk 265,000 7,420,000

Lantai 2
1 Lampu TL 2x36 Watt Inbow RM 300 16 bh 225,000 3,600,000
2 Lampu TL 2x18 Watt Inbow RM 300 60 bh 190,000 11,400,000
3 Lampu Baret Square 1x22 W 4 bh 269,800 1,079,200
4 Lampu Downlight 1x 11 W E27 8 bh 105,000 840,000
5 Lampu Downlight 1x 18 W E27 51 bh 110,000 5,610,000
6 Saklar Tunggal 26 bh 108,590 2,823,340
7 Saklar Ganda 21 bh 142,790 2,998,590
8 Saklar Tukar 12 bh 108,590 1,303,080
9 Instalasi penerangan 139 ttk 195,000 27,105,000
10 Outlet stopkontak, tunggal, 1ph, 10A/250VA 16 bh 199,788 3,196,600
11 Outlet stopkontak, ganda, 1ph, 16A/250VA 14 bh 199,788 2,797,025
12 Instalasi stopkontak 30 ttk 265,000 7,950,000

Lantai 3
1 Lampu TL 2x36 Watt Inbow RM 300 36 bh 225,000 8,100,000
2 Lampu TL 2x18 Watt Inbow RM 300 24 bh 190,000 4,560,000
3 Lampu Baret Square 1x22 W 4 bh 269,800 1,079,200
4 Lampu Downlight 1x 11 W E27 8 bh 105,000 840,000
5 Lampu Downlight 1x 18 W E27 49 bh 110,000 5,390,000
6 Saklar Tunggal 22 bh 108,590 2,388,980
7 Saklar Ganda 19 bh 142,790 2,713,010
8 Saklar Tukar 4 bh 108,590 434,360
9 Instalasi penerangan 121 ttk 195,000 23,595,000
10 Outlet stopkontak, tunggal, 1ph, 10A/250VA 12 bh 199,788 2,397,450
11 Outlet stopkontak, ganda, 1ph, 16A/250VA 12 bh 199,788 2,397,450
12 Instalasi stopkontak 24 ttk 265,000 6,360,000
SUB TOTAL 200,473,565
L.5. INSTALASI KABEL TRAY & LADDER
Instalasi kabel tray lantai 1
1 Kabel Tray uk.300x100mm 62 m1 105,000 6,510,000
2 Kabel Ladder di shaft listrik uk. 300cmm 6 m1 105,000 630,000
3 Aksesoris (Hanger, Elbow & Tee) 1 ls 130,000 130,000

Instalasi kabel tray lantai 2


1 Kabel Tray uk.300x100mm 62 m1 105,000 6,510,000
2 Kabel Ladder di shaft listrik uk.300cmm 6 m1 105,000 630,000
3 Aksesoris (Hanger, Elbow & Tee) 1 ls 130,000 130,000

Instalasi kabel tray lantai 3


1 Kabel Tray uk.300x100mm 62 m1 105,000 6,510,000
2 Kabel Ladder di shaft listrik uk.300cmm 6 m1 105,000 630,000
3 Aksesoris (Hanger, Elbow & Tee) 1 ls 130,000 130,000
SUB TOTAL 21,810,000

PEKERJAAN LAIN-LAIN/PENDUKUNG
RENCANA ANGGARAN BIAYA
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SAT
SATUAN HARGA
1 2 3 4 5 6
M.1. PEK. SALURAN KELILING
M 1 Pek. Galian tanah 114 m3 41,125 4,684,302
2 Pek. Urugan tanah kembali 30 m3 13,708 405,767
3 Pek. Pasangan buis beton U dia 30 cm 181 m1 91,066 16,464,774
4 Pek. Pasangan dinding batu bata 181 m2 101,521 18,354,906
5 Pek. Pasangan Plesteran 217 m2 54,395 11,801,539
6 Pek. Pasangan acian 217 m2 23,683 5,138,155
SUB TOTAL 56,849,444
M.2. PEK. GROUND TANK KAP ±15 M3
1 Pek. Galian tanah groundtank 16 m3 50,513 795,572
2 Pek. Pas. Lantai kerja/rabat beton 1 m3 758,219 545,918
3 Pek. Plat beton dasar 1 m3 4,954,563 5,350,928
4 Pek. Plat beton dinding 3 m3 4,954,563 15,606,874
5 Pek. Plat beton tutup 1 m3 4,954,563 5,350,928
6 Pek. Pasangan tangga besi 11 kg 11,756 129,203
7 Pek. Pasangan keramik 30/30 30 m2 166,480 4,994,400
SUB TOTAL 32,773,824
M.3. PEK. HALAMAN PARKIR
1 Pek. Galian tanah 20 m3 41,125 830,725
2 Pek. Urugan tanah kembali 8 m3 13,708 113,094
3 Pek. Urugan sirtu dipadatkan 45 m3 133,800 6,021,000
4 Pek. Urugan pasir 45 m3 143,170 6,442,650
5 Pek. Pasangan paving 450 m2 68,154 30,669,435
6 Pek. Pemasangan beton kanstin 4 m3 2,198,310 8,793,240
SUB TOTAL 52,870,144

8,310,732,005
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m3 Pondasi batu kali 1PC : 4 PP SNI : 2836:2008
1.200 m3 Batu Kali Rp 124,850.00 Rp 149,820.00
BAHAN 163.000 Kg PC Rp 1,650.00 Rp 268,950.00
0.520 m3 Pasir pasang Rp 121,000.00 Rp 62,920.00
1.500 OH Pekerja Rp 52,250.00 Rp 78,375.00
0.750 OH Tukang batu Rp 63,800.00 Rp 47,850.00
TENAGA
0.075 OH Kepala Tukang Rp 71,500.00 Rp 5,362.50
0.075 OH Mandor Rp 77,500.00 Rp 5,812.50
JUMLAH Rp 619,090.00
HARGA SATUAN Rp 619,090.00

1 m3 Pondasi batu kosong (aanstamping) SNI : 2836:2008


1.200 m3 Batu kali Rp 124,850.00 Rp 149,820.00
BAHAN
0.432 m3 Pasir urug Rp 105,600.00 Rp 45,619.20
0.780 OH Pekerja Rp 52,250.00 Rp 40,755.00
0.390 OH Tukang batu Rp 63,800.00 Rp 24,882.00
TENAGA
0.039 OH Kepala Tukang Rp 71,500.00 Rp 2,788.50
0.039 OH Mandor Rp 77,500.00 Rp 3,022.50
JUMLAH Rp 266,887.20
HARGA SATUAN Rp 266,887.20

1 m3 Pondasi siklop, 60% beton 1PC : 2PB : 3KR & 40% batu belah SNI : 2836:2008
0.480 m3 Batu kali Rp 124,850.00 Rp 59,928.00
194.000 Kg PC Rp 1,650.00 Rp 320,100.00
0.312 m3 Pasir Beton Rp 121,000.00 Rp 37,752.00
BAHAN
0.468 m3 Sirtu Rp 99,000.00 Rp 46,332.00
126.000 kg Besi Beton Rp 10,110.00 Rp 1,273,860.00
1.800 Kg Kawat Beton Rp 16,500.00 Rp 29,700.00
3.400 OH Pekerja Rp 52,250.00 Rp 177,650.00
0.850 OH Tukang batu Rp 63,800.00 Rp 54,230.00
TENAGA
0.085 OH Kepala Tukang Rp 71,500.00 Rp 6,077.50
0.170 OH Mandor Rp 77,500.00 Rp 13,175.00
JUMLAH Rp 2,018,804.50
HARGA SATUAN Rp 2,018,804.50

1 m3 Pondasi Sumuran, diameter 100 cm SNI : 2836:2008


0.450 m3 Batu kali Rp 124,850.00 Rp 56,182.50
194.000 Kg PC Rp 1,650.00 Rp 320,100.00
BAHAN
0.312 m3 Pasir Beton Rp 121,000.00 Rp 37,752.00
0.468 m3 Sirtu Rp 99,000.00 Rp 46,332.00
2.400 OH Pekerja Rp 52,250.00 Rp 125,400.00
0.800 OH Tukang batu Rp 63,800.00 Rp 51,040.00
TENAGA
0.080 OH Kepala Tukang Rp 71,500.00 Rp 5,720.00
0.119 OH Mandor Rp 77,500.00 Rp 9,222.50
JUMLAH Rp 651,749.00
HARGA SATUAN Rp 651,749.00

1 m2 Finishing siar pas. Batu kali adukan 1 PC : 2 PP SNI : 2837:2008


6.340 kg PC Rp 1,650.00 Rp 10,461.00
BAHAN
0.012 m3 Pasir pasang Rp 121,000.00 Rp 1,452.00
0.300 OH Pekerja Rp 52,250.00 Rp 15,675.00
0.150 OH Tukang batu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.015 OH Mandor Rp 77,500.00 Rp 1,162.50
JUMLAH Rp 39,393.00
HARGA SATUAN Rp 39,393.00
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa SNI : 7394:2008
230.000 kg PC Rp 1,650.00 Rp 379,500.00
0.638 m3 Pasir beton Rp 121,000.00 Rp 77,180.71
BAHAN
0.761 m3 Batu Split 2/3 Rp 262,900.00 Rp 199,998.74
200.000 liter Air Rp 100.00 Rp 20,000.00
1.200 OH Pekerja Rp 52,250.00 Rp 62,700.00
0.200 OH Tukang batu Rp 63,800.00 Rp 12,760.00
TENAGA
0.020 OH Kepala Tukang Rp 71,500.00 Rp 1,430.00
0.060 OH Mandor Rp 77,500.00 Rp 4,650.00
JUMLAH Rp 758,219.46
HARGA SATUAN Rp 758,219.46

1 m3 Beton mutu f'c = 14,5 Mpa SNI : 7394:2008


326.000 kg PC Rp 1,650.00 Rp 537,900.00
0.543 m3 Pasir beton Rp 121,000.00 Rp 65,703.00
BAHAN
0.762 m3 Batu Split 2/3 Rp 262,900.00 Rp 200,329.80
215.000 liter Air Rp 100.00 Rp 21,500.00
1.650 OH Pekerja Rp 52,250.00 Rp 86,212.50
0.275 OH Tukang batu Rp 63,800.00 Rp 17,545.00
TENAGA
0.028 OH Kepala Tukang Rp 71,500.00 Rp 2,002.00
0.083 OH Mandor Rp 77,500.00 Rp 6,432.50
JUMLAH Rp 937,624.80
HARGA SATUAN Rp 937,624.80

1 m3 Beton mutu f'c = 20,7 Mpa SNI : 7394:2008


384.000 kg PC Rp 1,650.00 Rp 633,600.00
0.494 m3 Pasir beton Rp 121,000.00 Rp 59,774.00
BAHAN
0.770 m3 Batu Split 2/3 Rp 262,900.00 Rp 202,433.00
215.000 liter Air Rp 100.00 Rp 21,500.00
1.650 OH Pekerja Rp 52,250.00 Rp 86,212.50
0.275 OH Tukang batu Rp 63,800.00 Rp 17,545.00
TENAGA
0.028 OH Kepala Tukang Rp 71,500.00 Rp 2,002.00
0.083 OH Mandor Rp 77,500.00 Rp 6,432.50
JUMLAH Rp 1,029,499.00
HARGA SATUAN Rp 1,029,499.00

Pembesian 10 kg dengan besi polos atau ulir SNI : 7394:2008


10.500 kg Besi beton (polos/ulir) Rp 10,110.00 Rp 106,155.00
BAHAN
0.150 kg Kawat beton Rp 16,500.00 Rp 2,475.00
0.070 OH Pekerja Rp 52,250.00 Rp 3,657.50
0.070 OH Tukang besi Rp 63,800.00 Rp 4,466.00
TENAGA
0.007 OH Kepala Tukang Rp 71,500.00 Rp 500.50
0.004 OH Mandor Rp 77,500.00 Rp 310.00
JUMLAH Rp 117,564.00
HARGA SATUAN Rp 117,564.00
1 kg -------------------> Rp 11,756.40

1 m2 bekisting untuk pondasi SNI : 7394:2008


0.040 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 112,200.00
BAHAN 0.300 kg Paku 5 cm - 10 cm Rp 19,303.00 Rp 5,790.90
0.100 liter Minyak bekisting Rp 4,500.00 Rp 450.00
0.520 OH Pekerja Rp 52,250.00 Rp 27,170.00
0.260 OH Tukang kayu Rp 63,800.00 Rp 16,588.00
TENAGA
0.026 OH Kepala Tukang Rp 71,500.00 Rp 1,859.00
0.026 OH Mandor Rp 77,500.00 Rp 2,015.00
JUMLAH Rp 166,072.90
HARGA SATUAN Rp 166,072.90

1 m2 bekisting untuk sloof SNI : 7394:2008


0.045 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 126,225.00
BAHAN 0.300 kg Paku 5 cm - 10 cm Rp 19,303.00 Rp 5,790.90
0.100 liter Minyak bekisting Rp 4,500.00 Rp 450.00
0.520 OH Pekerja Rp 52,250.00 Rp 27,170.00
0.260 OH Tukang kayu Rp 63,800.00 Rp 16,588.00
TENAGA
0.026 OH Kepala Tukang Rp 71,500.00 Rp 1,859.00
0.026 OH Mandor Rp 77,500.00 Rp 2,015.00
JUMLAH Rp 180,097.90
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
HARGA SATUAN Rp 180,097.90
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 bekisting untuk kolom SNI : 7394:2008
0.040 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 112,200.00
0.400 kg Paku 5 cm - 12 cm Rp 19,303.00 Rp 7,721.20
0.200 liter Minyak bekisting Rp 4,500.00 Rp 900.00
BAHAN
0.015 m3 Kayu balok lokal Rp 3,025,000.00 Rp 45,375.00
0.350 lbr Plywood Rp 128,508.00 Rp 44,977.80
2.000 btg Dolken Rp 6,250.00 Rp 12,500.00
0.660 OH Pekerja Rp 52,250.00 Rp 34,485.00
0.330 OH Tukang kayu Rp 63,800.00 Rp 21,054.00
TENAGA
0.033 OH Kepala Tukang Rp 71,500.00 Rp 2,359.50
0.033 OH Mandor Rp 77,500.00 Rp 2,557.50
JUMLAH Rp 284,130.00
HARGA SATUAN Rp 284,130.00

1 m2 bekisting untuk balok SNI : 7394:2008


0.040 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 112,200.00
0.400 kg Paku 5 cm - 12 cm Rp 19,303.00 Rp 7,721.20
0.200 liter Minyak bekisting Rp 4,500.00 Rp 900.00
BAHAN
0.018 m3 Kayu balok lokal Rp 3,025,000.00 Rp 54,450.00
0.350 lbr Plywood Rp 128,508.00 Rp 44,977.80
2.000 btg Dolken Rp 6,250.00 Rp 12,500.00
0.660 OH Pekerja Rp 52,250.00 Rp 34,485.00
0.330 OH Tukang kayu Rp 63,800.00 Rp 21,054.00
TENAGA
0.033 OH Kepala Tukang Rp 71,500.00 Rp 2,359.50
0.033 OH Mandor Rp 77,500.00 Rp 2,557.50
JUMLAH Rp 293,205.00
HARGA SATUAN Rp 293,205.00

1 m2 bekisting untuk plat lantai SNI : 7394:2008


0.040 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 112,200.00
0.400 kg Paku 5 cm - 12 cm Rp 19,303.00 Rp 7,721.20
0.200 liter Minyak bekisting Rp 4,500.00 Rp 900.00
BAHAN
0.015 m3 Kayu balok lokal Rp 3,025,000.00 Rp 45,375.00
0.350 lbr Plywood Rp 128,508.00 Rp 44,977.80
6.000 btg Dolken Rp 6,250.00 Rp 37,500.00
0.660 OH Pekerja Rp 52,250.00 Rp 34,485.00
0.330 OH Tukang kayu Rp 63,800.00 Rp 21,054.00
TENAGA
0.033 OH Kepala Tukang Rp 71,500.00 Rp 2,359.50
0.033 OH Mandor Rp 77,500.00 Rp 2,557.50
JUMLAH Rp 309,130.00
HARGA SATUAN Rp 309,130.00

1 m2 bekisting untuk tangga SNI : 7394:2008


0.030 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 84,150.00
0.400 kg Paku 5 cm - 12 cm Rp 19,303.00 Rp 7,721.20
0.150 liter Minyak bekisting Rp 4,500.00 Rp 675.00
BAHAN
0.015 m3 Kayu balok lokal Rp 3,025,000.00 Rp 45,375.00
0.350 lbr Plywood Rp 128,508.00 Rp 44,977.80
2.000 btg Dolken Rp 6,250.00 Rp 12,500.00
0.660 OH Pekerja Rp 52,250.00 Rp 34,485.00
0.330 OH Tukang kayu Rp 63,800.00 Rp 21,054.00
TENAGA
0.033 OH Kepala Tukang Rp 71,500.00 Rp 2,359.50
0.033 OH Mandor Rp 77,500.00 Rp 2,557.50
JUMLAH Rp 255,855.00
HARGA SATUAN Rp 255,855.00

1 m2 bekisting jembatan untuk pengecoran beton SNI : 7394:2008


0.0264 m3 Kayu papan bekisting lokal Rp 2,805,000.00 Rp 74,052.00
BAHAN 0.600 kg Paku 5 cm - 12 cm Rp 19,303.00 Rp 11,581.80
0.500 btg Dolken Rp 6,250.00 Rp 3,125.00
0.150 OH Pekerja Rp 52,250.00 Rp 7,837.50
0.050 OH Tukang kayu Rp 63,800.00 Rp 3,190.00
TENAGA
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
0.008 OH Mandor Rp 77,500.00 Rp 620.00
JUMLAH Rp 100,763.80
HARGA SATUAN Rp 100,763.80
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m3 Membongkar bekisting/rangka
TENAGA 4.000 OH Pekerja Rp 52,250.00 Rp 209,000.00
JUMLAH Rp 209,000.00
HARGA SATUAN Rp 209,000.00
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 M3 Beton Kanstin
1.000 m3 Beton f'c 14,5 Mpa Rp 937,624.80 Rp 937,624.80
7.000 m2 Bekisting Rp 180,097.90 Rp 1,260,685.30
HARGA SATUAN Rp 2,198,310.10

1 M1 Pengeboran Bored Pile Diameter 50cm


Asumsi menggunakan 1 alat bor lengkap, 2 pompa, 1 trafo las dan 1 genset dengan hasil min 12 m/hari
1.000 ls Mob demob Alat Rp 250,000.00 Rp 250,000.00
12.000 m1 Upah Pengeboran Rp 175,000.00 Rp 2,100,000.00
1.000 ls Sewa Peralatan (bor, genset, pompa) Rp 650,000.00 Rp 650,000.00
1.000 ls Bahan Bakar Rp 300,000.00 Rp 300,000.00
1.000 ls alat bantu (kawat las, selang dll) Rp 120,000.00 Rp 120,000.00
HARGA SATUAN Rp 3,420,000.00
per meter----/12 Rp 285,000.00
1 M3 Beton Bore pile
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
129.885 kg Pembesian Rp 11,756.40 Rp 1,526,980.01
HARGA SATUAN Rp 2,556,479.01
1 Unit Beton Pile Cap PC 1.5x1.5x0.5 M
1.125 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,158,186.38
133.048 kg Pembesian Rp 11,756.40 Rp 1,564,166.45
3.000 m2 Bekisting Rp 180,097.90 Rp 540,293.70
0.090 m3 Bongkaran bekisting Rp 209,000.00 Rp 18,810.00
HARGA SATUAN Rp 3,281,456.52
1 Unit Beton Pondasi PT1 (Tangga-1)
0.296 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 304,474.33
15.620 kg Pembesian Rp 11,756.40 Rp 183,637.55
0.910 m2 Bekisting Rp 166,072.90 Rp 151,126.34
0.027 m3 Bongkaran bekisting Rp 209,000.00 Rp 5,705.70
HARGA SATUAN Rp 644,943.92
1 Unit Beton Pondasi PT2 (Tangga-2)
0.273 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 281,503.63
15.620 kg Pembesian Rp 11,756.40 Rp 183,637.55
0.875 m2 Bekisting Rp 166,072.90 Rp 145,313.79
0.026 m3 Bongkaran bekisting Rp 209,000.00 Rp 5,486.25
HARGA SATUAN Rp 615,941.22
1 M3 Beton Kolom K1
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
169.060 kg Pembesian Rp 11,756.40 Rp 1,987,536.98
8.889 m2 Bekisting Rp 284,130.00 Rp 2,525,600.00
0.267 m3 Bongkaran bekisting Rp 209,000.00 Rp 55,733.33
HARGA SATUAN Rp 5,598,369.32
1 M3 Beton Kolom K1'
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
128.405 kg Pembesian Rp 11,756.40 Rp 1,509,574.66
8.889 m2 Bekisting Rp 284,130.00 Rp 2,525,600.00
0.267 m3 Bongkaran bekisting Rp 209,000.00 Rp 55,733.33
HARGA SATUAN Rp 5,120,407.00
1 M3 Beton Kolom KP
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
115.395 kg Pembesian Rp 11,756.40 Rp 1,356,629.78
13.333 m2 Bekisting Rp 284,130.00 Rp 3,788,400.00
0.400 m3 Bongkaran bekisting Rp 209,000.00 Rp 83,600.00
HARGA SATUAN Rp 6,258,128.78
1 M3 Beton Balok Ikat TB1
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
171.000 kg Pembesian Rp 11,756.40 Rp 2,010,344.40
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
10.000 m2 Bekisting Rp 180,097.90 Rp 1,800,979.00
0.300 m3 Bongkaran bekisting Rp 209,000.00 Rp 62,700.00
HARGA SATUAN Rp 4,903,522.40
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 M3 Beton Sloof S1
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
166.190 kg Pembesian Rp 11,756.40 Rp 1,953,796.12
10.000 m2 Bekisting Rp 180,097.90 Rp 1,800,979.00
0.300 m3 Bongkaran bekisting Rp 209,000.00 Rp 62,700.00
HARGA SATUAN Rp 4,846,974.12
1 M3 Beton Sloof S2
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
142.400 kg Pembesian Rp 11,756.40 Rp 1,674,111.36
13.333 m2 Bekisting Rp 180,097.90 Rp 2,401,305.33
0.400 m3 Bongkaran bekisting Rp 209,000.00 Rp 83,600.00
HARGA SATUAN Rp 5,188,515.69
1 M3 Beton Balok B1
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
143.556 kg Pembesian Rp 11,756.40 Rp 1,687,701.76
8.205 m2 Bekisting Rp 293,205.00 Rp 2,405,784.62
0.246 m3 Bongkaran bekisting Rp 209,000.00 Rp 51,446.15
HARGA SATUAN Rp 5,174,431.53
1 M3 Beton Balok B2
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
159.663 kg Pembesian Rp 11,756.40 Rp 1,877,062.09
10.222 m2 Bekisting Rp 293,205.00 Rp 2,997,206.67
0.307 m3 Bongkaran bekisting Rp 209,000.00 Rp 64,093.33
HARGA SATUAN Rp 5,967,861.09
1 M3 Beton Balok B3
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
210.830 kg Pembesian Rp 11,756.40 Rp 2,478,601.81
13.333 m2 Bekisting Rp 293,205.00 Rp 3,909,400.00
0.400 m3 Bongkaran bekisting Rp 209,000.00 Rp 83,600.00
HARGA SATUAN Rp 7,501,100.81
1 M3 Beton Balok B4
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
139.440 kg Pembesian Rp 11,756.40 Rp 1,639,312.42
9.538 m2 Bekisting Rp 293,205.00 Rp 2,796,724.62
0.286 m3 Bongkaran bekisting Rp 209,000.00 Rp 59,806.15
HARGA SATUAN Rp 5,525,342.19
1 M3 Beton Balok B5
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
158.886 kg Pembesian Rp 11,756.40 Rp 1,867,927.37
12.222 m2 Bekisting Rp 293,205.00 Rp 3,583,616.67
0.367 m3 Bongkaran bekisting Rp 209,000.00 Rp 76,633.33
HARGA SATUAN Rp 6,557,676.37
1 M3 Beton Balok B6
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
184.748 kg Pembesian Rp 11,756.40 Rp 2,171,965.51
8.889 m2 Bekisting Rp 293,205.00 Rp 2,606,266.67
0.267 m3 Bongkaran bekisting Rp 209,000.00 Rp 55,733.33
HARGA SATUAN Rp 5,863,464.51
1 M3 Beton Balok B7
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
174.500 kg Pembesian Rp 11,756.40 Rp 2,051,485.92
12.500 m2 Bekisting Rp 293,205.00 Rp 3,665,062.50
0.375 m3 Bongkaran bekisting Rp 209,000.00 Rp 78,375.00
HARGA SATUAN Rp 6,824,422.42
1 M3 Beton Balok B8
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
142.400 kg Pembesian Rp 11,756.40 Rp 1,674,111.36
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
16.667 m2 Bekisting Rp 293,205.00 Rp 4,886,750.00
0.500 m3 Bongkaran bekisting Rp 209,000.00 Rp 104,500.00
HARGA SATUAN Rp 7,694,860.36
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 M3 Beton Balok R1
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
120.120 kg Pembesian Rp 11,756.40 Rp 1,412,178.77
12.500 m2 Bekisting Rp 293,205.00 Rp 3,665,062.50
0.375 m3 Bongkaran bekisting Rp 209,000.00 Rp 78,375.00
HARGA SATUAN Rp 6,185,115.27
1 M3 Beton Balok R2
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
181.510 kg Pembesian Rp 11,756.40 Rp 2,133,904.16
8.333 m2 Bekisting Rp 293,205.00 Rp 2,443,375.00
0.250 m3 Bongkaran bekisting Rp 209,000.00 Rp 52,250.00
HARGA SATUAN Rp 5,659,028.16
1 M3 Beton Balok Latei
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
175.170 kg Pembesian Rp 11,756.40 Rp 2,059,368.59
8.333 m2 Bekisting Rp 293,205.00 Rp 2,443,375.00
0.250 m3 Bongkaran bekisting Rp 209,000.00 Rp 52,250.00
HARGA SATUAN Rp 5,584,492.59
1 M3 Beton Plat lantai, dak dan bordes
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
110.300 kg Pembesian Rp 11,756.40 Rp 1,296,730.92
8.333 m2 Bekisting Rp 309,130.00 Rp 2,576,083.33
0.250 m3 Bongkaran bekisting Rp 209,000.00 Rp 52,250.00
HARGA SATUAN Rp 4,954,563.25
1 M3 Beton plat tangga
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
167.100 kg Pembesian Rp 11,756.40 Rp 1,964,494.44
6.667 m2 Bekisting Rp 255,855.00 Rp 1,705,700.00
0.200 m3 Bongkaran bekisting Rp 209,000.00 Rp 41,800.00
HARGA SATUAN Rp 4,741,493.44
1 M3 Beton plat topian
1.000 m3 Beton f'c 20,7 MPa Rp 1,029,499.00 Rp 1,029,499.00
65.800 kg Besi Polos Rp 11,756.40 Rp 773,571.12
10.000 m2 Bekisting Rp 309,130.00 Rp 3,091,300.00
0.300 m3 Bongkaran bekisting Rp 209,000.00 Rp 62,700.00
HARGA SATUAN Rp 4,957,070.12
1 M3 Beton balok lisplank
1.000 m3 Beton 1 : 2 : 3 Rp 1,029,499.00 Rp 1,029,499.00
87.420 kg Pembesian Rp 11,756.40 Rp 1,027,744.49
6.806 m2 Bekisting Rp 293,205.00 Rp 1,995,422.92
0.204 m3 Bongkaran bekisting Rp 209,000.00 Rp 42,670.83
HARGA SATUAN Rp 4,095,337.24
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Pembuatan kantor Sementara, dengan lantai plesteran SNI 2006
1.250 btg Dolken Kayu Ø 8 cm / 100 cm Rp 6,250.00 Rp 7,812.50
0.180 m3 Kayu Rp 2,805,000.00 Rp 504,900.00
0.850 kg Kayu biasa Rp 2,805,000.00 Rp 2,384,250.00
1.100 kg Besi strip Rp 6,500.00 Rp 7,150.00
35.000 kg Semen portland Rp 1,650.00 Rp 57,750.00
0.150 m3 Pasir pasang Rp 121,000.00 Rp 18,150.00
0.100 m3 Pasir beton Rp 121,000.00 Rp 12,100.00
BAHAN
0.150 m3 Koral Rp 99,000.00 Rp 14,850.00
30.000 bh Bata merah Rp 763.00 Rp 22,890.00
0.250 lbr Seng plat Rp 62,500.00 Rp 15,625.00
2.000 bh Jendela nako Rp 150,000.00 Rp 300,000.00
0.080 m2 Kaca polos Rp 89,603.00 Rp 7,168.24
0.150 bh Kunci tanam Rp 90,000.00 Rp 13,500.00
0.060 lbr Plywood 4 mm Rp 72,500.00 Rp 4,350.00
0.200 Oh Pekerja Rp 52,250.00 Rp 10,450.00
0.200 Oh Tukang Kayu Rp 63,800.00 Rp 12,760.00
TENAGA 0.100 Oh Tukang batu Rp 63,800.00 Rp 6,380.00
0.030 Oh Kepala tukang Rp 71,500.00 Rp 2,145.00
0.005 Oh Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 3,402,618.24
HARGA SATUAN Rp 3,402,618.24

1 m2 Pembuatan bedeng buruh SNI 2006


1.250 btg Dolken Kayu Ø 8 cm / 400 cm Rp 6,250.00 Rp 7,812.50
0.186 m3 Kayu Rp 2,805,000.00 Rp 521,730.00
0.300 kg Paku biasa Rp 19,303.00 Rp 5,790.90
18.000 kg Semen portland Rp 1,650.00 Rp 29,700.00
BAHAN
0.030 m3 Pasir beton Rp 121,000.00 Rp 3,630.00
0.050 m3 Koral beton Rp 99,000.00 Rp 4,950.00
1.500 lbr Seng gelombang Bjls 32. Rp 62,500.00 Rp 93,750.00
1.350 lbr Plywood 4 mm Rp 72,500.00 Rp 97,875.00
1.000 Oh Pekerja Rp 52,250.00 Rp 52,250.00
2.000 Oh Tukang Kayu Rp 63,800.00 Rp 127,600.00
TENAGA
0.200 Oh Kepala tukang Rp 71,500.00 Rp 14,300.00
0.050 Oh Mandor Rp 77,500.00 Rp 3,875.00
JUMLAH Rp 963,263.40
HARGA SATUAN Rp 963,263.40

1 m2 Pembuatan bak adukan ukuran (40 x 50 x 20) cm SNI 2006


0.036 btg Kayu bekisting Rp 2,805,000.00 Rp 100,980.00
BAHAN 0.080 kg Paku biasa Rp 19,303.00 Rp 1,544.24
1.000 kg Kaso 5/7 Rp 2,805,000.00 Rp 2,805,000.00
0.300 Oh Tukang Kayu Rp 63,800.00 Rp 19,140.00
TENAGA
0.0015 Oh Mandor Rp 77,500.00 Rp 116.25
JUMLAH Rp 2,926,780.49
HARGA SATUAN Rp 2,926,780.49

1 m' Pengukuran dan Pasang bouwplank SNI 03-2835-2002


0.012 m3 Kayu Lokal Rp 2,805,000.00 Rp 33,660.00
BAHAN 0.020 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 386.06
0.007 m3 Kayu lokal papan Rp 2,805,000.00 Rp 19,635.00
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.100 OH Tukang Kayu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 66,388.56
HARGA SATUAN Rp 66,388.56

1 m2 Membersihkan lapangan dan perataan SNI 03-2835-2002


0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
TENAGA
0.050 OH Mandor Rp 77,500.00 Rp 3,875.00
JUMLAH Rp 9,100.00
HARGA SATUAN Rp 9,100.00
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
Memadatkan 1 m3 tanah (per 20 cm) SNI : 2835:2008
0.500 OH Pekerja Rp 52,250.00 Rp 26,125.00
TENAGA
0.050 OH Mandor Rp 77,500.00 Rp 3,875.00
JUMLAH Rp 30,000.00
HARGA SATUAN Rp 30,000.00
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m3 Urugan pasir SNI : 2835:2008
BAHAN 1.200 m3 Pasir urug Rp 105,600.00 Rp 126,720.00
0.300 OH Pekerja Rp 52,250.00 Rp 15,675.00
TENAGA
0.010 OH Mandor Rp 77,500.00 Rp 775.00
JUMLAH Rp 143,170.00
HARGA SATUAN Rp 143,170.00

1 m3 Sirtu padat untuk peninggian lantai bangunan SNI : 2835:2008


BAHAN 1.200 m3 Sirtu Rp 99,000.00 Rp 118,800.00
0.250 OH Pekerja Rp 52,250.00 Rp 13,062.50
TENAGA
0.025 OH Mandor Rp 77,500.00 Rp 1,937.50
JUMLAH Rp 133,800.00
HARGA SATUAN Rp 133,800.00

1 m3 Membongkar beton bertulang SNI : 2002


6.667 OH Pekerja Rp 52,250.00 Rp 348,350.75
TENAGA
0.333 OH Mandor Rp 77,500.00 Rp 25,807.50
JUMLAH Rp 374,158.25
HARGA SATUAN Rp 374,158.25

1 m3 Membongkar dinding tembok bata merah SNI Rev. : 2005


2.000 OH Pekerja Rp 52,250.00 Rp 104,500.00
TENAGA
0.090 OH Mandor Rp 77,500.00 Rp 6,975.00
JUMLAH Rp 111,475.00
HARGA SATUAN Rp 111,475.00

1 m3 Membongkar plesteran dinding SNI Rev. : 2005


0.050 OH Pekerja Rp 52,250.00 Rp 2,612.50
TENAGA
0.025 OH Mandor Rp 77,500.00 Rp 1,937.50
JUMLAH Rp 4,550.00
HARGA SATUAN Rp 4,550.00
1 m3 Membongkar genteng dipakai lagi SNI Rev. : 2005
0.040 OH Pekerja Rp 52,250.00 Rp 2,090.00
TENAGA
0.020 OH Mandor Rp 77,500.00 Rp 1,550.00
JUMLAH Rp 3,640.00
HARGA SATUAN Rp 3,640.00

1 m3 Membongkar reng/kaso-kaso dipakai lagi SNI Rev. : 2005


0.050 Oh Pekerja Rp 52,250.00 Rp 2,612.50
0.200 Oh Tukang kayu Rp 63,800.00 Rp 12,760.00
TENAGA
0.005 Oh Kepala Tukang Rp 71,500.00 Rp 357.50
0.010 Oh Mandor Rp 77,500.00 Rp 775.00
JUMLAH Rp 16,505.00
HARGA SATUAN Rp 16,505.00
1 m3 Membongkar kuda-kuda/gording dipakai lagi SNI Rev. : 2005
6.000 Oh Pekerja Rp 52,250.00 Rp 313,500.00
4.000 Oh Tukang kayu Rp 63,800.00 Rp 255,200.00
TENAGA
0.600 Oh Kepala Tukang Rp 71,500.00 Rp 42,900.00
0.200 Oh Mandor Rp 77,500.00 Rp 15,500.00
JUMLAH Rp 627,100.00
HARGA SATUAN Rp 627,100.00
1 m2 Membongkar rangka plafon dipakai lagi SNI Rev. : 2005
0.100 Oh Pekerja Rp 52,250.00 Rp 5,225.00
0.250 Oh Tukang kayu Rp 63,800.00 Rp 15,950.00
TENAGA
0.015 Oh Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.005 Oh Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 22,635.00
HARGA SATUAN Rp 22,635.00

1 m3 Galian tanah biasa sedalam 1 meter SNI : 2835:2008


0.750 OH Pekerja Rp 52,250.00 Rp 39,187.50
TENAGA
0.025 OH Mandor Rp 77,500.00 Rp 1,937.50
JUMLAH Rp 41,125.00
HARGA SATUAN Rp 41,125.00
1 m3 Galian tanah biasa sedalam 2 meter SNI : 2835:2008
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
0.900 OH Pekerja Rp 52,250.00 Rp 47,025.00
TENAGA
0.045 OH Mandor Rp 77,500.00 Rp 3,487.50
JUMLAH Rp 50,512.50
HARGA SATUAN Rp 50,512.50
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 4PP SNI : 6897:2008
70.000 bh Batu bata Rp 763.00 Rp 53,410.00
BAHAN 11.500 kg PC Rp 1,650.00 Rp 18,975.00
0.043 m3 Pasir pasang Rp 121,000.00 Rp 5,203.00
0.300 OH Pekerja Rp 52,250.00 Rp 15,675.00
0.100 OH Tukang batu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.015 OH Mandor Rp 77,500.00 Rp 1,162.50
JUMLAH Rp 101,520.50
HARGA SATUAN Rp 101,520.50

1 m2 Plesteran , 1PC : 4PP tebal 20 mm SNI : 2837:2008


8.320 kg PC Rp 1,650.00 Rp 13,728.00
BAHAN
0.032 m3 Pasir pasang Rp 121,000.00 Rp 3,872.00
0.400 OH Pekerja Rp 52,250.00 Rp 20,900.00
0.200 OH Tukang batu Rp 63,800.00 Rp 12,760.00
TENAGA
0.020 OH Kepala Tukang Rp 71,500.00 Rp 1,430.00
0.022 OH Mandor Rp 77,500.00 Rp 1,705.00
JUMLAH Rp 54,395.00
HARGA SATUAN Rp 54,395.00

1 m' Plesteran Skoning, 1PC : 2PP tebal 10 mm SNI : 2837:2008


0.500 kg PC Rp 1,650.00 Rp 825.00
BAHAN
0.013 m3 Pasir pasang Rp 121,000.00 Rp 1,573.00
0.080 OH Pekerja Rp 52,250.00 Rp 4,180.00
0.400 OH Tukang batu Rp 63,800.00 Rp 25,520.00
TENAGA
0.040 OH Kepala Tukang Rp 71,500.00 Rp 2,860.00
0.004 OH Mandor Rp 77,500.00 Rp 310.00
JUMLAH Rp 35,268.00
HARGA SATUAN Rp 35,268.00

1 m2 Acian SNI : 2837:2008


BAHAN 3.250 kg PC Rp 1,650.00 Rp 5,362.50
0.200 OH Pekerja Rp 52,250.00 Rp 10,450.00
0.100 OH Tukang batu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.010 OH Mandor Rp 77,500.00 Rp 775.00
JUMLAH Rp 23,682.50
HARGA SATUAN Rp 23,682.50

1 m2 Memasang lantai keramik uk.(30x30) cm SNI : 7395:2008


11.8700 bh Keramik 30x30 Rp 4,500.00 Rp 53,415.00
10.0000 kg PC Rp 1,650.00 Rp 16,500.00
BAHAN
0.0450 m3 Pasir pasang Rp 121,000.00 Rp 5,445.00
1.5000 kg Semen warna Rp 18,000.00 Rp 27,000.00
0.700 OH Pekerja Rp 52,250.00 Rp 36,575.00
0.350 OH Tukang batu Rp 63,800.00 Rp 22,330.00
TENAGA
0.035 OH Kepala Tukang Rp 71,500.00 Rp 2,502.50
0.035 OH Mandor Rp 77,500.00 Rp 2,712.50
JUMLAH Rp 166,480.00
HARGA SATUAN Rp 166,480.00

1 m2 Memasang lantai keramik uk.(20x20) cm SNI : 7395:2008


26.5000 bh Keramik 20x20 Rp 2,600.00 Rp 68,900.00
10.4000 kg PC Rp 1,650.00 Rp 17,160.00
BAHAN
0.0450 m3 Pasir pasang Rp 121,000.00 Rp 5,445.00
1.6200 kg Semen warna Rp 18,000.00 Rp 29,160.00
0.700 OH Pekerja Rp 52,250.00 Rp 36,575.00
0.350 OH Tukang batu Rp 63,800.00 Rp 22,330.00
TENAGA
0.035 OH Kepala Tukang Rp 71,500.00 Rp 2,502.50
0.035 OH Mandor Rp 77,500.00 Rp 2,712.50
JUMLAH Rp 184,785.00
HARGA SATUAN Rp 184,785.00
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Memasang dinding keramik uk.(20x20) cm SNI : 7395:2008
26.5000 bh Keramik dinding 20x20 Rp 2,600.00 Rp 68,900.00
9.3000 kg PC Rp 1,650.00 Rp 15,345.00
BAHAN
0.0180 m3 Pasir pasang Rp 121,000.00 Rp 2,178.00
1.9400 kg Semen warna Rp 18,000.00 Rp 34,920.00
0.090 OH Pekerja Rp 52,250.00 Rp 4,702.50
0.450 OH Tukang batu Rp 63,800.00 Rp 28,710.00
TENAGA
0.045 OH Kepala Tukang Rp 71,500.00 Rp 3,217.50
0.045 OH Mandor Rp 77,500.00 Rp 3,487.50
JUMLAH Rp 161,460.50
HARGA SATUAN Rp 161,460.50

1 m2 Memasang dinding keramik uk.(20x25) cm SNI : 7395:2008


21.2000 bh Keramik dinding 20x25 Rp 3,250.00 Rp 68,900.00
9.3000 kg PC Rp 1,650.00 Rp 15,345.00
BAHAN
0.0180 m3 Pasir pasang Rp 121,000.00 Rp 2,178.00
1.5520 kg Semen warna Rp 18,000.00 Rp 27,936.00
0.090 OH Pekerja Rp 52,250.00 Rp 4,702.50
0.450 OH Tukang batu Rp 63,800.00 Rp 28,710.00
TENAGA
0.045 OH Kepala Tukang Rp 71,500.00 Rp 3,217.50
0.045 OH Mandor Rp 77,500.00 Rp 3,487.50
JUMLAH Rp 154,476.50
HARGA SATUAN Rp 154,476.50

1 m1 Memasang plint keramik uk.(10x30) cm SNI : 7395:2008


3.5300 bh Plint keramik Rp 1,500.00 Rp 5,295.00
1.1400 kg PC Rp 1,650.00 Rp 1,881.00
BAHAN
0.0030 m3 Pasir pasang Rp 121,000.00 Rp 363.00
0.1000 kg Semen warna Rp 18,000.00 Rp 1,800.00
0.090 OH Pekerja Rp 52,250.00 Rp 4,702.50
0.090 OH Tukang batu Rp 63,800.00 Rp 5,742.00
TENAGA
0.009 OH Kepala Tukang Rp 71,500.00 Rp 643.50
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 20,814.50
HARGA SATUAN Rp 20,814.50

1 m2 Memasang dinding batu tempel SNI : 7395:2008


1.1000 m2 Batu tempel Rp 225,000.00 Rp 247,500.00
BAHAN 11.7500 kg PC Rp 1,650.00 Rp 19,387.50
0.0350 m3 Pasir pasang Rp 121,000.00 Rp 4,235.00
0.700 OH Pekerja Rp 52,250.00 Rp 36,575.00
0.350 OH Tukang batu Rp 63,800.00 Rp 22,330.00
TENAGA
0.035 OH Kepala Tukang Rp 71,500.00 Rp 2,502.50
0.035 OH Mandor Rp 77,500.00 Rp 2,712.50
JUMLAH Rp 335,242.50
HARGA SATUAN Rp 335,242.50

1 m2 Mengecat bidang tembok lama interior SNI : 2002


0.1200 kg Cat dasar Rp 16,339.00 Rp 1,960.68
BAHAN
0.1800 kg Cat penutup Rp 16,339.00 Rp 2,941.02
0.028 OH Pekerja Rp 52,250.00 Rp 1,463.00
0.042 OH Tukang cat Rp 63,800.00 Rp 2,679.60
TENAGA
0.004 OH Kepala Tukang Rp 71,500.00 Rp 300.30
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 9,538.35
HARGA SATUAN Rp 9,538.35

1 m2 Mengecat bidang tembok baru interior SNI : 2002


0.1000 kg Plamir Rp 18,227.00 Rp 1,822.70
BAHAN 0.1000 kg Cat dasar Rp 16,339.00 Rp 1,633.90
0.2600 kg Cat penutup Rp 16,339.00 Rp 4,248.14
0.020 OH Pekerja Rp 52,250.00 Rp 1,045.00
0.063 OH Tukang cat Rp 63,800.00 Rp 4,019.40
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 450.45
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 13,413.34
HARGA SATUAN Rp 13,413.34
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Mengecat bidang tembok lama exterior SNI : 2002
0.1200 kg Cat dasar Rp 90,000.00 Rp 10,800.00
BAHAN
0.1800 kg Cat penutup Rp 90,000.00 Rp 16,200.00
0.028 OH Pekerja Rp 52,250.00 Rp 1,463.00
0.042 OH Tukang cat Rp 63,800.00 Rp 2,679.60
TENAGA
0.004 OH Kepala Tukang Rp 71,500.00 Rp 300.30
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 31,636.65
HARGA SATUAN Rp 31,636.65

1 m2 Mengecat bidang tembok baru exterior SNI : 2002


0.1000 kg Plamir Rp 18,227.00 Rp 1,822.70
BAHAN 0.1000 kg Cat dasar Rp 90,000.00 Rp 9,000.00
0.2600 kg Cat penutup Rp 90,000.00 Rp 23,400.00
0.020 OH Pekerja Rp 52,250.00 Rp 1,045.00
0.063 OH Tukang cat Rp 63,800.00 Rp 4,019.40
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 450.45
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 39,931.30
HARGA SATUAN Rp 39,931.30

1 m2 Mengecat plafon eternit/ gypsum SNI : 2002


0.120 kg Cat dasar Rp 16,339.00 Rp 1,960.68
BAHAN
0.180 kg Cat penutup Rp 16,339.00 Rp 2,941.02
0.028 OH Pekerja Rp 52,250.00 Rp 1,463.00
0.042 OH Tukang cat Rp 63,800.00 Rp 2,679.60
TENAGA
0.004 OH Kepala Tukang Rp 71,500.00 Rp 300.30
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 9,538.35
HARGA SATUAN Rp 9,538.35

1 m1 Memasang got U - 30 cm SNI


0.0060 m3 Pas. Bata merah 1PC : 4 Ps Rp 1,015,205.00 Rp 6,091.23
BAHAN
1.0000 m1 Got -U 30/Buis beton U30 Rp 48,400.00 Rp 48,400.00
TENAGA 0.700 OH Pekerja Rp 52,250.00 Rp 36,575.00
JUMLAH Rp 91,066.23
HARGA SATUAN Rp 91,066.23

1 m2 Memasang paving block, motif natural/persegi SNI


1.0500 m2 Paving block Rp 34,606.00 Rp 36,336.30
BAHAN
0.1200 m3 Pasir urug Rp 105,600.00 Rp 12,672.00
0.240 OH Pekerja Rp 52,250.00 Rp 12,540.00
0.080 OH Tukang batu Rp 63,800.00 Rp 5,104.00
TENAGA
0.008 OH Kepala Tukang Rp 71,500.00 Rp 572.00
0.012 OH Mandor Rp 77,500.00 Rp 930.00
JUMLAH Rp 68,154.30
HARGA SATUAN Rp 68,154.30

1 m2 Memasang lantai keramik uk.(40x40) cm SNI : 7395:2008


6.2500 bh Keramik 40x40 Rp 10,800.00 Rp 67,500.00
9.7000 kg PC Rp 1,650.00 Rp 16,005.00
BAHAN
0.0450 m3 Pasir pasang Rp 121,000.00 Rp 5,445.00
1.5000 kg Semen warna Rp 18,000.00 Rp 27,000.00
0.700 OH Pekerja Rp 52,250.00 Rp 36,575.00
0.350 OH Tukang batu Rp 63,800.00 Rp 22,330.00
TENAGA
0.035 OH Kepala Tukang Rp 71,500.00 Rp 2,502.50
0.035 OH Mandor Rp 77,500.00 Rp 2,712.50
JUMLAH Rp 180,070.00
HARGA SATUAN Rp 180,070.00
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Memasang atap asbes SNI : 03-3436-2002
1.020 lbr Asbes Rp 16,775.00 Rp 17,110.50
BAHAN
0.200 kg Paku biasa 2"-5" Rp 19,303.00 Rp 3,860.60
0.200 OH Pekerja Rp 52,250.00 Rp 10,450.00
0.100 OH Tukang Kayu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.010 OH Mandor Rp 77,500.00 Rp 775.00
JUMLAH Rp 39,291.10
HARGA SATUAN Rp 39,291.10

1 m1 Memasang nok genteng metal SNI : 03-3436-2002


1.100 bh Nok asbes Rp 35,000.00 Rp 38,500.00
BAHAN
0.050 kg Paku biasa 1/2"-1" Rp 19,303.00 Rp 965.15
0.250 OH Pekerja Rp 52,250.00 Rp 13,062.50
0.150 OH Tukang Kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.013 OH Mandor Rp 77,500.00 Rp 1,007.50
JUMLAH Rp 64,177.65
HARGA SATUAN Rp 64,177.65
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m3 Konstruksi Gording lama SNI : 3434:2008
3.000 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 57,909.00
BAHAN
15.000 Kg Besi strip Rp 6,500.00 Rp 97,500.00
2.400 OH Pekerja Rp 52,250.00 Rp 125,400.00
7.200 OH Tukang Kayu Rp 63,800.00 Rp 459,360.00
TENAGA
0.720 OH Kepala Tukang Rp 71,500.00 Rp 51,480.00
0.120 OH Mandor Rp 77,500.00 Rp 9,300.00
JUMLAH Rp 800,949.00
HARGA SATUAN Rp 800,949.00

1 m2 Rangka atap genteng keramik, kayu lama SNI : 3434:2008


BAHAN 0.250 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 4,825.75
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.100 OH Tukang Kayu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.050 OH Mandor Rp 77,500.00 Rp 3,875.00
JUMLAH Rp 21,020.75
HARGA SATUAN Rp 21,020.75

1 m2 Rangka langit-langit, kayu lokal uk. (50x100) cm SNI : 3434:2008


0.0154 m3 Kayu lokal, balok Rp 3,025,000.00 Rp 46,585.00
BAHAN
0.200 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 3,860.60
0.150 OH Pekerja Rp 52,250.00 Rp 7,837.50
0.300 OH Tukang Kayu Rp 63,800.00 Rp 19,140.00
TENAGA
0.030 OH Kepala Tukang Rp 71,500.00 Rp 2,145.00
0.075 OH Mandor Rp 77,500.00 Rp 5,812.50
JUMLAH Rp 85,380.60
HARGA SATUAN Rp 85,380.60

1 m2 Rangka langit-langit, kayu lokal uk. (60x60) cm SNI : 3434:2008


0.0163 m3 Kayu lokal, balok Rp 3,025,000.00 Rp 49,307.50
BAHAN
0.250 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 4,825.75
0.200 OH Pekerja Rp 52,250.00 Rp 10,450.00
0.300 OH Tukang Kayu Rp 63,800.00 Rp 19,140.00
TENAGA
0.030 OH Kepala Tukang Rp 71,500.00 Rp 2,145.00
0.075 OH Mandor Rp 77,500.00 Rp 5,812.50
JUMLAH Rp 91,680.75
HARGA SATUAN Rp 91,680.75

1 m1 Memasang Lisplank uk. (3x20) cm kayu lokal SNI : 3434:2008


0.0108 m3 Kayu lokal, papan Rp 3,025,000.00 Rp 32,670.00
BAHAN
0.100 Kg Paku biasa 2" - 5" Rp 19,303.00 Rp 1,930.30
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.200 OH Tukang Kayu Rp 63,800.00 Rp 12,760.00
TENAGA
0.020 OH Kepala Tukang Rp 71,500.00 Rp 1,430.00
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 54,402.80
HARGA SATUAN Rp 54,402.80

1 m2 Memasang langit-langit tripleks uk. (120 x 240) cm, tebal 3 mm SNI : 2839:2008
0.3750 lbr Tripleks Rp 72,385.00 Rp 27,144.38
BAHAN
0.0300 kg Paku kecil Rp 19,303.00 Rp 579.09
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.100 OH Tukang Kayu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 40,430.97
HARGA SATUAN Rp 40,430.97

1 m2 Memasang langit-langit gypsum board, uk. (1200 x 2400 x 9) mm SNI : 2839:2008


0.3640 lbr Gypsum board Rp 62,000.00 Rp 22,568.00
BAHAN
0.1100 kg Paku sekrup Rp 19,303.00 Rp 2,123.33
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
TENAGA
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
0.050 OH Tukang Kayu Rp 63,800.00 Rp 3,190.00
TENAGA
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 33,851.33
HARGA SATUAN Rp 33,851.33
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m1 Memasang list gypsum profil SNI : 2839:2008
1.0500 m' List gypsum profil Rp 9,000.00 Rp 9,450.00
BAHAN
0.1500 kg Tepung gypsum/compoun Rp 10,000.00 Rp 1,500.00
0.060 OH Pekerja Rp 52,250.00 Rp 3,135.00
0.060 OH Tukang Kayu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.003 OH Mandor Rp 77,500.00 Rp 232.50
JUMLAH Rp 18,574.50
HARGA SATUAN Rp 18,574.50

1 m1 Memasang Lisplank papan GRC SNI : 3434:2008


1.0200 m1 Papan GRC Rp 40,000.00 Rp 40,800.00
BAHAN
0.050 Kg Baut/paku Rp 19,303.00 Rp 965.15
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.200 OH Tukang Kayu Rp 63,800.00 Rp 12,760.00
TENAGA
0.020 OH Kepala Tukang Rp 71,500.00 Rp 1,430.00
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 61,567.65
HARGA SATUAN Rp 61,567.65

1 m2 pasang rangka dinding pemisah teakwood rangkap, rk. kayu SNI : 2006
0.0195 m3 kayu balok Rp 3,025,000.00 Rp 58,987.50
0.007 m3 kayu papan Rp 3,025,000.00 Rp 21,175.00
BAHAN 0.100 kg paku biasa 2" - 5" Rp 19,303.00 Rp 1,930.30
0.560 ltr lem kayu Rp 40,000.00 Rp 22,400.00
1.000 lbr teakwood Rp 72,500.00 Rp 72,500.00
0.150 Oh Pekerja Rp 52,250.00 Rp 7,837.50
0.450 Oh Tukang kayu Rp 63,800.00 Rp 28,710.00
TENAGA 0.045 Oh Kepala tukang Rp 71,500.00 Rp 3,217.50
0.075 Oh Mandor Rp 77,500.00 Rp 5,812.50
JUMLAH Rp 222,570.30
HARGA SATUAN Rp 222,570.30

1 m2 pasang rangka dinding pemisah mega sungkai rangkap, rk. kayu SNI : 2006
0.0195 m3 kayu balok Rp 3,025,000.00 Rp 58,987.50
0.007 m3 kayu papan Rp 3,025,000.00 Rp 21,175.00
BAHAN 0.100 kg paku biasa 2" - 5" Rp 19,303.00 Rp 1,930.30
0.560 ltr lem kayu Rp 40,000.00 Rp 22,400.00
1.000 lbr mega sungkai Rp 130,000.00 Rp 130,000.00
0.150 Oh Pekerja Rp 52,250.00 Rp 7,837.50
0.450 Oh Tukang kayu Rp 63,800.00 Rp 28,710.00
TENAGA 0.045 Oh Kepala tukang Rp 71,500.00 Rp 3,217.50
0.075 Oh Mandor Rp 77,500.00 Rp 5,812.50
JUMLAH Rp 280,070.30
HARGA SATUAN Rp 280,070.30
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 buah Pasang kunci tanam biasa (kecil) SNI : 2002
BAHAN 1.0000 bh Kunci tanam kecil Rp 90,000.00 Rp 90,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
0.500 OH Tukang kayu Rp 63,800.00 Rp 31,900.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.005 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 123,525.00
HARGA SATUAN Rp 123,525.00

1 buah Pasang kunci silinder SNI : 2002


BAHAN 1.0000 bh Kunci silinder Rp 80,000.00 Rp 80,000.00
0.005 OH Pekerja Rp 52,250.00 Rp 261.25
0.500 OH Tukang kayu Rp 63,800.00 Rp 31,900.00
TENAGA
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
0.0025 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 112,712.50
HARGA SATUAN Rp 112,712.50

1 buah Pasang engsel pintu SNI : 2002


BAHAN 1.0000 bh Engsel pintu Rp 15,000.00 Rp 15,000.00
0.015 OH Pekerja Rp 52,250.00 Rp 783.75
0.150 OH Tukang kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.00075 OH Mandor Rp 77,500.00 Rp 58.13
JUMLAH Rp 26,484.38
HARGA SATUAN Rp 26,484.38

1 buah Pasang engsel jendela SNI : 2002


BAHAN 1.0000 bh Engsel jendela Rp 8,000.00 Rp 8,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
0.100 OH Tukang kayu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.00050 OH Mandor Rp 77,500.00 Rp 38.75
JUMLAH Rp 15,656.25
HARGA SATUAN Rp 15,656.25

1 buah Pasang grendel pintu SNI : 2002


BAHAN 1.0000 bh Grendel pintu Rp 9,000.00 Rp 9,000.00
0.020 OH Pekerja Rp 52,250.00 Rp 1,045.00
0.200 OH Tukang kayu Rp 63,800.00 Rp 12,760.00
TENAGA
0.020 OH Kepala Tukang Rp 71,500.00 Rp 1,430.00
0.00100 OH Mandor Rp 77,500.00 Rp 77.50
JUMLAH Rp 24,312.50
HARGA SATUAN Rp 24,312.50

1 buah Pasang grendel jendela SNI : 2002


BAHAN 1.0000 bh Grendel jendela Rp 5,000.00 Rp 5,000.00
0.015 OH Pekerja Rp 52,250.00 Rp 783.75
0.150 OH Tukang kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.00050 OH Mandor Rp 77,500.00 Rp 38.75
JUMLAH Rp 16,465.00
HARGA SATUAN Rp 16,465.00

1 buah Pasang hak angin SNI : 2002


BAHAN 1.0000 bh Hak angin Rp 12,500.00 Rp 12,500.00
0.015 OH Pekerja Rp 52,250.00 Rp 783.75
0.150 OH Tukang kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.00075 OH Mandor Rp 77,500.00 Rp 58.13
JUMLAH Rp 23,984.38
HARGA SATUAN Rp 23,984.38

1 buah Pasang pegangan pintu/door holder SNI : 2002


KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
BAHAN 1.0000 bh Pegangan pintu Rp 180,000.00 Rp 180,000.00
0.050 OH Pekerja Rp 52,250.00 Rp 2,612.50
0.500 OH Tukang kayu Rp 63,800.00 Rp 31,900.00
TENAGA
0.050 OH Kepala Tukang Rp 71,500.00 Rp 3,575.00
0.00250 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 218,281.25
HARGA SATUAN Rp 218,281.25
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 buah Pasang pegangan jendela/handel SNI : 2002
BAHAN 1.0000 bh Pegangan jendela/ handel Rp 15,000.00 Rp 15,000.00
0.015 OH Pekerja Rp 52,250.00 Rp 783.75
0.150 OH Tukang kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.00015 OH Mandor Rp 77,500.00 Rp 11.63
JUMLAH Rp 26,437.88
HARGA SATUAN Rp 26,437.88

1 buah Pasang door closer SNI : 2002


BAHAN 1.0000 bh Door closer Rp 240,000.00 Rp 240,000.00
0.050 OH Pekerja Rp 52,250.00 Rp 2,612.50
0.500 OH Tukang kayu Rp 63,800.00 Rp 31,900.00
TENAGA
0.050 OH Kepala Tukang Rp 71,500.00 Rp 3,575.00
0.00250 OH Mandor Rp 77,500.00 Rp 193.75
JUMLAH Rp 278,281.25
HARGA SATUAN Rp 278,281.25

1 m2 Pasang kaca bening 5 mm SNI : 2002


BAHAN 1.1000 bh Kaca bening 5 mm Rp 89,603.00 Rp 98,563.30
0.015 OH Pekerja Rp 52,250.00 Rp 783.75
0.150 OH Tukang kayu Rp 63,800.00 Rp 9,570.00
TENAGA
0.015 OH Kepala Tukang Rp 71,500.00 Rp 1,072.50
0.00075 OH Mandor Rp 77,500.00 Rp 58.13
JUMLAH Rp 110,047.68
HARGA SATUAN Rp 110,047.68

1 kg Pasang besi profil SNI : 7393:2008


BAHAN 1.1500 bh Besi profil Rp 10,430.00 Rp 11,994.50
0.060 OH Pekerja Rp 52,250.00 Rp 3,135.00
0.060 OH Tukang las konstruksi Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.003 OH Mandor Rp 77,500.00 Rp 232.50
JUMLAH Rp 19,619.00
HARGA SATUAN Rp 19,619.00

1 kg Pasang rangka kuda-kuda baja ringan SNI : 7393:2008


BAHAN 1.1500 bh Besi baja ringan Rp 19,000.00 Rp 21,850.00
0.060 OH Pekerja Rp 52,250.00 Rp 3,135.00
0.060 OH Tukang Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.003 OH Mandor Rp 77,500.00 Rp 232.50
JUMLAH Rp 29,474.50
HARGA SATUAN Rp 29,474.50

1 kg Pasang rangka kuda-kuda baja IWF SNI : 7393:2008


BAHAN 1.1500 bh Besi baja IWF Rp 10,430.00 Rp 11,994.50
0.060 OH Pekerja Rp 52,250.00 Rp 3,135.00
0.060 OH Tukang Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.003 OH Mandor Rp 77,500.00 Rp 232.50
JUMLAH Rp 19,619.00
HARGA SATUAN Rp 19,619.00

100 kg Pekerjaan perakitan SNI : 7393:2008


1.0000 ltr Solar Rp 10,200.00 Rp 10,200.00
BAHAN
0.1000 ltr Minyak pelumas Rp 24,000.00 Rp 2,400.00
0.100 OH Pekerja Rp 52,250.00 Rp 5,225.00
0.100 OH Tukang Rp 63,800.00 Rp 6,380.00
TENAGA
0.001 OH Kepala Tukang Rp 71,500.00 Rp 71.50
0.005 OH Mandor Rp 77,500.00 Rp 387.50
ALAT 0.800 Jam Sewa alat Rp 135,000.00 Rp 108,000.00
JUMLAH Rp 132,664.00
HARGA SATUAN Rp 132,664.00
HARGA SATUAN PER 1KG Rp 1,326.64
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Pintu besi plat baja tebal 2 mm rangkap, rangkap baja siku SNI : 7393:2008
15.0000 kg Besi siku L 30.30.3 Rp 10,430.00 Rp 156,450.00
BAHAN 32.8000 kg Besi plat baja Rp 19,000.00 Rp 623,200.00
0.0500 kg Kawat las Rp 45,000.00 Rp 2,250.00
1.050 OH Pekerja Rp 52,250.00 Rp 54,862.50
1.050 OH Tukang las biasa Rp 63,800.00 Rp 66,990.00
TENAGA
0.105 OH Kepala Tukang Rp 71,500.00 Rp 7,507.50
0.0520 OH Mandor Rp 77,500.00 Rp 4,030.00
JUMLAH Rp 915,290.00
HARGA SATUAN Rp 915,290.00

10 cm Pengelasan dengan las listrik SNI : 7393:2008


0.4000 kg Kawat las listrik Rp 45,000.00 Rp 18,000.00
BAHAN 0.3000 liter Solar Rp 10,200.00 Rp 3,060.00
0.0400 liter Minyak pelumas Rp 24,000.00 Rp 960.00
0.040 OH Pekerja Rp 52,250.00 Rp 2,090.00
0.020 OH Tukang besi konstruksi Rp 63,800.00 Rp 1,276.00
TENAGA
0.002 OH Kepala Tukang Rp 71,500.00 Rp 143.00
0.002 OH Mandor Rp 77,500.00 Rp 155.00
ALAT 0.170 Jam Sewa alat Rp 135,000.00 Rp 22,950.00
JUMLAH Rp 48,634.00
HARGA SATUAN Rp 48,634.00

1 m2 Pasang pintu lipat (folding gate) SNI : 7393:2008


BAHAN 1.0000 m2 Pintu lipat Rp 525,000.00 Rp 525,000.00
0.440 OH Pekerja Rp 52,250.00 Rp 22,990.00
0.440 OH Tukang Rp 63,800.00 Rp 28,072.00
TENAGA
0.044 OH Kepala Tukang Rp 71,500.00 Rp 3,146.00
0.022 OH Mandor Rp 77,500.00 Rp 1,705.00
JUMLAH Rp 580,913.00
HARGA SATUAN Rp 580,913.00

1 m2 Pasang rolling door aluminium SNI : 7393:2008


BAHAN 1.0000 m2 Rolling door aluminium Rp 425,000.00 Rp 425,000.00
1.000 OH Pekerja Rp 52,250.00 Rp 52,250.00
1.000 OH Tukang khusus aluminium Rp 63,800.00 Rp 63,800.00
TENAGA
0.100 OH Kepala Tukang Rp 71,500.00 Rp 7,150.00
0.050 OH Mandor Rp 77,500.00 Rp 3,875.00
JUMLAH Rp 552,075.00
HARGA SATUAN Rp 552,075.00

1 m' Pasang kusen pintu aluminium SNI : 7393:2008


1.1000 m' Profil aluminium Rp 118,000.00 Rp 129,800.00
BAHAN 2.0000 buah Skrup fixer Rp 1,000.00 Rp 2,000.00
0.0600 tube Sealant Rp 50,000.00 Rp 3,000.00
0.043 OH Pekerja Rp 52,250.00 Rp 2,246.75
0.043 OH Tukang khusus aluminium Rp 63,800.00 Rp 2,743.40
TENAGA
0.0043 OH Kepala Tukang Rp 71,500.00 Rp 307.45
0.0021 OH Mandor Rp 77,500.00 Rp 162.75
JUMLAH Rp 140,260.35
HARGA SATUAN Rp 140,260.35

1 m2 Pasang pintu aluminium SNI : 7393:2008


4.4000 m' Profil aluminium Rp 118,000.00 Rp 519,200.00
BAHAN
14.6000 m' Alluminium strip Rp 28,000.00 Rp 408,800.00
0.085 OH Pekerja Rp 52,250.00 Rp 4,441.25
0.085 OH Tukang khusus aluminium Rp 63,800.00 Rp 5,423.00
TENAGA
0.0085 OH Kepala Tukang Rp 71,500.00 Rp 607.75
0.0042 OH Mandor Rp 77,500.00 Rp 325.50
JUMLAH Rp 938,797.50
HARGA SATUAN Rp 938,797.50

1 m2 Pasang jendela aluminium SNI : 7393:2008


1.0000 m2 Jendela aluminium Rp 620,000.00 Rp 620,000.00
BAHAN
0.2700 tube Sealant Rp 16,032.00 Rp 4,328.64
0.085 OH Pekerja Rp 52,250.00 Rp 4,441.25
0.085 OH Tukang khusus aluminium Rp 63,800.00 Rp 5,423.00
TENAGA
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
TENAGA
0.0085 OH Kepala Tukang Rp 71,500.00 Rp 607.75
0.0042 OH Mandor Rp 77,500.00 Rp 325.50
JUMLAH Rp 635,126.14
HARGA SATUAN Rp 635,126.14
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m2 Pasang terali besi tempa SNI : 7393:2008
9.3000 kg Besi tempa(10 mm) Rp 10,430.00 Rp 96,999.00
BAHAN
27.0800 cm Pengelasan Rp 4,863.40 Rp 131,700.87
1.670 OH Pekerja Rp 52,250.00 Rp 87,257.50
1.670 OH Tukang kayu Rp 63,800.00 Rp 106,546.00
TENAGA
0.167 OH Kepala Tukang Rp 71,500.00 Rp 11,940.50
0.083 OH Mandor Rp 77,500.00 Rp 6,432.50
JUMLAH Rp 440,876.37
HARGA SATUAN Rp 440,876.37

1 UNIT PASANG PINTU/JENDELA TYPE PD1


14.400 m1 Kusen 140,260.35 2,019,749.04
3.030 m2 Daun Pintu 938,797.50 2,844,556.43
1.340 m2 Kaca 5mm 110,047.68 147,463.88
6.000 bh Engsel pintu 26,484.38 158,906.25
2.000 bh Door Closer 278,281.25 556,562.50
1.000 bh Kunci 123,525.00 123,525.00
2.000 bh Handle 218,281.25 436,562.50
Jumlah 6,287,325.60

1 UNIT PASANG PINTU/JENDELA TYPE PD2


8.480 m1 Kusen 140,260.35 1,189,407.77
3.570 m2 Daun Pintu 938,797.50 3,351,507.08
0.480 m2 Kaca 5mm 110,047.68 52,822.88
6.000 bh Engsel pintu 26,484.38 158,906.25
2.000 bh Door Closer 278,281.25 556,562.50
1.000 bh Kunci 123,525.00 123,525.00
2.000 bh Handle 218,281.25 436,562.50
Jumlah 5,869,293.98

1 UNIT PASANG PINTU/JENDELA TYPE P1


9.800 m1 Kusen 140,260.35 1,374,551.43
1.740 m2 Daun Pintu 938,797.50 1,633,507.65
0.690 m2 Kaca 5mm 110,047.68 75,932.90
3.000 bh Engsel pintu 26,484.38 79,453.13
1.000 bh Door Closer 278,281.25 278,281.25
1.000 bh Kunci 123,525.00 123,525.00
1.000 bh Handle 218,281.25 218,281.25
Jumlah 3,783,532.60

1 UNIT PASANG PINTU/JENDELA TYPE P2


6.700 m1 Kusen 140,260.35 939,744.35
1.740 m2 Daun Pintu 938,797.50 1,633,507.65
0.230 m2 Kaca 5mm 110,047.68 25,310.97
3.000 bh Engsel pintu 26,484.38 79,453.13
1.000 bh Door Closer 278,281.25 278,281.25
1.000 bh Kunci 123,525.00 123,525.00
1.000 bh Handle 218,281.25 218,281.25
Jumlah 3,298,103.59

1 UNIT PASANG PINTU/JENDELA TYPE P3


5.100 m1 Kusen 140,260.35 715,327.79
1.740 m2 Daun Pintu 938,797.50 1,633,507.65
3.000 bh Engsel pintu 26,484.38 79,453.13
1.000 bh Kunci 123,525.00 123,525.00
1.000 bh Handle 218,281.25 218,281.25
Jumlah 2,770,094.81

1 UNIT PASANG PINTU/JENDELA TYPE P4


5.000 m1 Kusen 140,260.35 701,301.75
1.440 m2 Daun Pintu 938,797.50 1,351,868.40
3.000 bh Engsel pintu 26,484.38 79,453.13
1.000 bh Kunci 123,525.00 123,525.00
1.000 bh Handle 218,281.25 218,281.25
Jumlah 2,474,429.53
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 UNIT PASANG PINTU/JENDELA TYPE P5
1.800 m1 Kusen 140,260.35 252,468.63
0.210 m2 Daun Pintu 938,797.50 197,147.48
2.000 bh Engsel pintu 26,484.38 52,968.75
1.000 bh Kunci 123,525.00 123,525.00
1.000 bh Handle 218,281.25 218,281.25
Jumlah 844,391.11

1 UNIT PASANG PINTU/JENDELA TYPE J1


9.000 m1 Kusen 140,260.35 1,262,343.15
1.850 m2 Daun Jendela 635,126.14 1,174,729.31
8.000 bh Hak angin 23,984.38 191,875.00
8.000 bh Engsel jendela 15,656.25 125,250.00
4.000 bh Handle jendela 26,437.88 105,751.50
Jumlah 2,859,948.96

1 UNIT PASANG PINTU/JENDELA TYPE J2


5.700 m1 Kusen 140,260.35 799,484.00
0.800 m2 Daun Jendela 635,126.14 508,100.91
0.300 m2 Kaca 5mm 110,047.68 33,014.30
2.000 bh Hak angin 23,984.38 47,968.75
2.000 bh Engsel jendela 15,656.25 31,312.50
1.000 bh Handle jendela 26,437.88 26,437.88
Jumlah 1,446,318.33

1 UNIT PASANG PINTU/JENDELA TYPE J3


10.800 m1 Kusen 140,260.35 1,514,811.78
1.680 m2 Daun Jendela 635,126.14 1,067,011.92
1.450 m2 Kaca 5mm 110,047.68 159,569.13
4.000 bh Hak angin 23,984.38 95,937.50
4.000 bh Engsel jendela 15,656.25 62,625.00
2.000 bh Handle jendela 26,437.88 52,875.75
Jumlah 2,952,831.07

1 UNIT PASANG PINTU/JENDELA TYPE J4


2.000 m1 Kusen 140,260.35 280,520.70
0.160 m2 Daun Jendela 635,126.14 101,620.18
2.000 bh Hak angin 23,984.38 47,968.75
2.000 bh Engsel jendela 15,656.25 31,312.50
1.000 bh Handle jendela 26,437.88 26,437.88
Jumlah 487,860.01

1 UNIT PASANG PINTU/JENDELA TYPE J5


4.200 m1 Kusen 140,260.35 589,093.47
0.700 m2 Daun Jendela 635,126.14 444,588.30
2.000 bh Hak angin 23,984.38 47,968.75
2.000 bh Engsel jendela 15,656.25 31,312.50
1.000 bh Handle jendela 26,437.88 26,437.88
Jumlah 1,139,400.89

1 UNIT PASANG PINTU/JENDELA TYPE J6


5.800 m1 Kusen 140,260.35 813,510.03
0.770 m2 Kaca 5mm 110,047.68 84,736.71
Jumlah 898,246.74

1 UNIT PASANG PINTU/JENDELA TYPE J7


2.400 m1 Kusen 140,260.35 336,624.84
0.260 m2 Kaca 5mm 110,047.68 28,656.41
Jumlah 365,281.25
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 buah Pasang kloset duduk/monoblok SNI : 2002
1.0000 bh kloset duduk/monoblok Rp 2,874,960.00 Rp 2,874,960.00
BAHAN
6% Harga kloset Perlengkapan Rp 172,497.60
3.300 OH Pekerja Rp 52,250.00 Rp 172,425.00
1.100 OH Tukang batu Rp 63,800.00 Rp 70,180.00
TENAGA
0.001 OH Kepala Tukang Rp 71,500.00 Rp 71.50
0.1600 OH Mandor Rp 77,500.00 Rp 12,400.00
JUMLAH Rp 3,302,534.10
HARGA SATUAN Rp 3,302,534.10

1 buah Pasang kloset jongkok SNI : 2002


1.0000 bh kloset jongkok Rp 150,000.00 Rp 150,000.00
BAHAN 6.0000 kg PC Rp 1,650.00 Rp 9,900.00
0.0100 m3 Pasir pasang Rp 121,000.00 Rp 1,210.00
1.000 OH Pekerja Rp 52,250.00 Rp 52,250.00
1.500 OH Tukang batu Rp 63,800.00 Rp 95,700.00
TENAGA
1.500 OH Kepala Tukang Rp 71,500.00 Rp 107,250.00
0.1600 OH Mandor Rp 77,500.00 Rp 12,400.00
JUMLAH Rp 428,710.00
HARGA SATUAN Rp 428,710.00

1 buah urinoir SNI : 2002


1.0000 bh Urinoir Rp 2,850,000.00 Rp 2,850,000.00
30% harga urinoir Perlengkapan Rp 855,000.00
BAHAN
6.0000 kg PC Rp 1,650.00 Rp 9,900.00
0.0100 m3 Pasir pasang Rp 121,000.00 Rp 1,210.00
1.000 OH Pekerja Rp 52,250.00 Rp 52,250.00
1.000 OH Tukang batu Rp 63,800.00 Rp 63,800.00
TENAGA
0.100 OH Kepala Tukang Rp 71,500.00 Rp 7,150.00
0.1000 OH Mandor Rp 77,500.00 Rp 7,750.00
JUMLAH Rp 3,847,060.00
HARGA SATUAN Rp 3,847,060.00

1 buah washtafel SNI : 2002


1.0000 bh Washtafel Rp 1,150,000.00 Rp 1,150,000.00
12% hrg Washtafel Perlengkapan Rp 138,000.00
BAHAN
6.0000 kg PC Rp 1,650.00 Rp 9,900.00
0.0100 m3 Pasir pasang Rp 121,000.00 Rp 1,210.00
1.200 OH Pekerja Rp 52,250.00 Rp 62,700.00
0.750 OH Tukang batu Rp 63,800.00 Rp 47,850.00
TENAGA
0.070 OH Kepala Tukang Rp 71,500.00 Rp 5,005.00
0.1100 OH Mandor Rp 77,500.00 Rp 8,525.00
JUMLAH Rp 1,423,190.00
HARGA SATUAN Rp 1,423,190.00

1 buah bak mandi batu bata vol. 0,3 m3 SNI : 2002


252.000 bh Batu bata Rp 763.00 Rp 192,276.00
120.000 kg PC Rp 1,650.00 Rp 198,000.00
BAHAN 0.3000 m3 Pasir pasang Rp 121,000.00 Rp 36,300.00
108.900 bh Keramik 20x20 Rp 2,600.00 Rp 283,140.00
6.0000 kg Semen nat Rp 18,000.00 Rp 108,000.00
6.000 OH Pekerja Rp 52,250.00 Rp 313,500.00
3.000 OH Tukang batu Rp 63,800.00 Rp 191,400.00
TENAGA
0.300 OH Kepala Tukang Rp 71,500.00 Rp 21,450.00
0.3000 OH Mandor Rp 77,500.00 Rp 23,250.00
JUMLAH Rp 1,367,316.00
HARGA SATUAN Rp 1,367,316.00

1 m1 Pasang pipa PVC tipe AW dia 1/2" SNI : 2002


1.2000 m' Pipa PVC Rp 8,500.00 Rp 10,200.00
BAHAN
35% Harga pipa Perlengkapan Rp 2,975.00
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
TENAGA
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 19,452.50
HARGA SATUAN Rp 19,452.50
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m1 Pasang pipa PVC tipe AW dia 3/4" SNI : 2002
1.2000 m' Pipa PVC Rp 12,000.00 Rp 14,400.00
BAHAN
35% Harga pipa Perlengkapan Rp 4,200.00
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 24,877.50
HARGA SATUAN Rp 24,877.50

1 m1 Pasang pipa PVC tipe AW dia 1" SNI : 2002


1.2000 m' Pipa PVC Rp 7,109.00 Rp 8,530.80
BAHAN
35% Harga pipa Perlengkapan Rp 2,488.15
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 17,296.45
HARGA SATUAN Rp 17,296.45

1 m1 Pasang pipa PVC tipe AW dia 1,25" SNI : 2002


1.2000 m' Pipa PVC Rp 7,260.00 Rp 8,712.00
BAHAN
35% Harga pipa Perlengkapan Rp 2,541.00
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 17,530.50
HARGA SATUAN Rp 17,530.50

1 m1 Pasang pipa PVC tipe AW dia 1,50" SNI : 2002


1.2000 m' Pipa PVC Rp 7,563.00 Rp 9,075.60
BAHAN
35% Harga pipa Perlengkapan Rp 2,647.05
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 18,000.15
HARGA SATUAN Rp 18,000.15

1 m1 Pasang pipa PVC tipe AW dia 2,00" SNI : 2002


1.2000 m' Pipa PVC Rp 10,918.00 Rp 13,101.60
BAHAN
35% Harga pipa Perlengkapan Rp 3,821.30
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 23,200.40
HARGA SATUAN Rp 23,200.40

1 m1 Pasang pipa PVC tipe AW dia 2,50" SNI : 2002


1.2000 m' Pipa PVC Rp 13,007.00 Rp 15,608.40
BAHAN
35% Harga pipa Perlengkapan Rp 4,552.45
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 26,438.35
HARGA SATUAN Rp 26,438.35

1 m1 Pasang pipa PVC tipe AW dia 3" SNI : 2002


1.2000 m' Pipa PVC Rp 16,032.00 Rp 19,238.40
BAHAN
35% Harga pipa Perlengkapan Rp 5,611.20
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
JUMLAH Rp 31,127.10
HARGA SATUAN Rp 31,127.10
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 m1 Pasang pipa PVC tipe AW dia 4" SNI : 2002
1.2000 m' Pipa PVC Rp 26,771.00 Rp 32,125.20
BAHAN
35% Harga pipa Perlengkapan Rp 9,369.85
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 47,772.55
HARGA SATUAN Rp 47,772.55

1 m1 Pasang pipa PVC tipe AW dia 6" SNI : 2002


1.2000 m' Pipa PVC Rp 90,000.00 Rp 108,000.00
BAHAN
35% Harga pipa Perlengkapan Rp 31,500.00
0.036 OH Pekerja Rp 52,250.00 Rp 1,881.00
0.060 OH Tukang batu Rp 63,800.00 Rp 3,828.00
TENAGA
0.006 OH Kepala Tukang Rp 71,500.00 Rp 429.00
0.0018 OH Mandor Rp 77,500.00 Rp 139.50
JUMLAH Rp 145,777.50
HARGA SATUAN Rp 145,777.50

1 m1 Pasang kran dia 1/2" dan 3/4" SNI : 2002


1.0000 m' Kran Rp 75,000.00 Rp 75,000.00
BAHAN
0.0250 bh Seal tape Rp 7,000.00 Rp 175.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
0.100 OH Tukang batu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.0050 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 83,180.00
HARGA SATUAN Rp 83,180.00

1 m1 Pasang floordrain SNI : 2002


BAHAN 1.0000 m' Floordrain Rp 75,000.00 Rp 75,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
0.100 OH Tukang batu Rp 63,800.00 Rp 6,380.00
TENAGA
0.010 OH Kepala Tukang Rp 71,500.00 Rp 715.00
0.0050 OH Mandor Rp 77,500.00 Rp 387.50
JUMLAH Rp 83,005.00
HARGA SATUAN Rp 83,005.00
ANALISA HARGA SATUAN PEKERJAAN KONSTRUKSI
BANGUNAN GEDUNG DAN PERUMAHAN
TAHUN 2015
KET KOEF SAT URAIAN HARGA SATUAN JUMLAH
1 titik Pasang Stop kontak SNI
15.000 m' Kabel NYA 1 x 2,5 mm Rp 6,900.00 Rp 103,500.00
BAHAN 1.200 btg Pipa pralon 5/8" Rp 8,500.00 Rp 10,200.00
1.000 bh Stop kontak + indoos Rp 48,000.00 Rp 48,000.00
0.050 OH Pekerja Rp 52,250.00 Rp 2,612.50
TENAGA 0.500 OH Tukang listrik Rp 63,800.00 Rp 31,900.00
0.050 OH Kepala Tukang Rp 71,500.00 Rp 3,575.00
JUMLAH Rp 199,787.50
HARGA SATUAN Rp 199,787.50

1 titik Pasang Saklar tunggal SNI


12.000 m' Kabel NYA 1 x 1,5 mm Rp 4,200.00 Rp 50,400.00
BAHAN 2.000 btg Pipa pralon 5/8" Rp 8,500.00 Rp 17,000.00
1.000 bh Saklar tunggal + indoos Rp 38,000.00 Rp 38,000.00
TENAGA 0.050 OH Tukang listrik Rp 63,800.00 Rp 3,190.00
JUMLAH Rp 108,590.00
HARGA SATUAN Rp 108,590.00

1 titik Pasang Saklar ganda SNI


18.000 m' Kabel NYA 1 x 1,5 mm Rp 4,200.00 Rp 75,600.00
BAHAN 2.000 btg Pipa pralon 5/8" Rp 10,000.00 Rp 20,000.00
1.000 bh Saklar ganda Rp 44,000.00 Rp 44,000.00
TENAGA 0.050 OH Tukang listrik Rp 63,800.00 Rp 3,190.00
JUMLAH Rp 142,790.00
HARGA SATUAN Rp 142,790.00

1 buah Pasang Lampu TL 20 watt SNI


BAHAN 1.000 bh Lampu TL 20 watt Rp 45,000.00 Rp 45,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
TENAGA 0.020 OH Tukang listrik Rp 63,800.00 Rp 1,276.00
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
JUMLAH Rp 47,156.00
HARGA SATUAN Rp 47,156.00

1 buah Pasang Lampu SL 18 watt SNI


1.000 bh Lampu SL 18 watt Rp 35,000.00 Rp 35,000.00
BAHAN
1.000 bh Fiting keramik Rp 18,000.00 Rp 18,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
TENAGA 0.020 OH Tukang listrik Rp 63,800.00 Rp 1,276.00
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
JUMLAH Rp 55,156.00
HARGA SATUAN Rp 55,156.00

1 buah Pasang Lampu Pijar 25 watt SNI


1.000 bh Lampu pijar 25 watt Rp 15,000.00 Rp 15,000.00
BAHAN
1.000 bh Fiting keramik Rp 18,000.00 Rp 18,000.00
0.010 OH Pekerja Rp 52,250.00 Rp 522.50
TENAGA 0.020 OH Tukang listrik Rp 63,800.00 Rp 1,276.00
0.005 OH Kepala Tukang Rp 71,500.00 Rp 357.50
JUMLAH Rp 35,156.00
HARGA SATUAN Rp 35,156.00
DAFTAR HARGA UPAH DAN HARGA BAHAN
PEKERJAAN : PEMBANGUNAN RUKO
LOKASI : INDONESIA
T. ANGGARAN : 2015

DAFTAR HARGA UPAH & BAHAN HARGA SATUAN


1 Pekerja Rp. 52,250.00 / o/h
2 Tukang Rp. 63,800.00 / o/h
3 Kepala tukang Rp. 71,500.00 / o/h
4 Mandor Rp. 77,500.00 / o/h

1 Air cor didatangkan Rp. 100.00 / ltr


2 Batu pecah/cor Rp. 262,900.00 / m3
3 Sirtu Rp. 99,000.00 / m3
4 Batu tempel Rp. 225,000.00 / m2
5 Batu bata Rp. 763.00 / bh
6 Batu belah/kali Rp. 124,850.00 / m3
7 Baja ringan Rp. 19,000.00 / kg
8 Besi beton polos Rp. 10,110.00 / kg
9 Besi beton ulir Rp. 10,430.00 / kg
10 Besi profil Rp. 10,430.00 / kg
11 Besi strip Rp. 6,500.00 / m1
12 Cat Interior Rp. 16,339.00 / kg
13 Cat Exterior Rp. 90,000.00 / kg
14 Coumpon Rp. 10,000.00 / kg
15 Dolken Rp. 6,250.00 / btg
16 Gypsum board Rp. 62,000.00 / lbr
17 Glass Block Rp. 32,000.00 / bh
18 List gypsum 10 cm Rp. 9,000.00 / m1
19 Atap asbes Rp. 16,775.00 / lembar
20 Nok/Bubungan atap metal Rp. 35,000.00 / m1
21 Kayu Lokal Rp. 3,025,000.00 / m3
22 Kayu Bekisting Rp. 2,805,000.00 / m3
23 Keramik 40/40 Rp. 10,800.00 / bh
24 Keramik 20/20 Rp. 2,600.00 / bh
25 Keramik 20/25 Rp. 3,250.00 / bh
26 Keramik 30/30 Rp. 4,500.00 / bh
27 Kawat beton Rp. 16,500.00 / kg
28 Kaca 5 mm Rp. 89,603.00 / m2
29 Minyak bekisting Rp. 4,500.00 / ltr
30 Pasir cor/pasang Rp. 121,000.00 / m3
31 Pasir urug Rp. 105,600.00 / m3
32 Paku Rp. 19,303.00 / kg
33 Papan GRC Rp. 40,000.00 / m1
34 Paving block Rp. 34,606.00 / m2
35 Multiplek Rp. 128,508.00 / lbr
36 Plamir Rp. 18,227.00 / kg
37 Semen PC Rp. 1,650.00 / kg
38 Semen grout Rp. 18,000.00 / kg
39 Kran air Rp. 75,000.00 / bh
40 Seal tape Rp. 7,000.00 / roll
41 Stop Kran Rp. 75,000.00 / bh
42 Closet jongkok Rp. 150,000.00 / unit
43 Closet duduk Rp. 2,874,960.00 / unit
44 Washtavel Rp. 1,150,000.00 / bh
45 Urinoir Rp. 2,850,000.00 / bh
DAFTAR HARGA UPAH & BAHAN HARGA SATUAN
46 Floor drain Rp. 75,000.00 / bh
47 Kusen Alumunium silver Rp. 118,000.00 / m1
48 Alumunium strip Rp. 28,000.00 / m1
DAFTAR HARGA UPAH & BAHAN HARGA SATUAN
49 Jendela Alumunium Kaca Rp. 620,000.00 / unit
50 Pipa PVC dia 6" Rp. 90,000.00 / m1
51 Pipa PVC dia 5" Rp. 65,000.00 / m1
52 Pipa PVC dia 4" Rp. 26,771.00 / m1
53 Pipa PVC dia 3" Rp. 16,032.00 / m1
54 Pipa PVC dia 2.5" Rp. 13,007.00 / m1
55 Pipa PVC dia 2" Rp. 10,918.00 / m1
56 Pipa PVC dia 1.5" Rp. 7,563.00 / m1
57 Pipa PVC dia 1.25" Rp. 7,260.00 / m1
58 Pipa PVC dia 1" Rp. 7,109.00 / m1
59 Pipa PVC dia 3/4" Rp. 12,000.00 / m1
60 Pipa PVC dia 1/2" Rp. 8,500.00 / m1
61 Kunci tanam kecil Rp. 90,000.00 / bh
62 Kunci silinder Rp. 80,000.00 / bh
63 Engsel pintu Rp. 15,000.00 / bh
64 Engsel jendela Rp. 8,000.00 / bh
65 Gerendel pintu Rp. 9,000.00 / bh
66 Gerendel jendela Rp. 5,000.00 / bh
67 Hak angin Rp. 12,500.00 / bh
68 Pegangan pintu/door holder Rp. 180,000.00 / bh
69 Pegangan jendela Rp. 15,000.00 / bh
70 Door closer Rp. 240,000.00 / bh
71 Sewa alat untuk perakitan besi Rp. 135,000.00 / jam
72 Solar Rp. 10,200.00 / ltr
73 Minyak pelumas Rp. 24,000.00 / ltr
74 Kawat las Rp. 45,000.00 / kg
75 Pintu lipat/folding gate Rp. 525,000.00 / m2
76 Pintu gulung/rolling door allumunium Rp. 425,000.00 / m2
77 Sealent Rp. 50,000.00 / tube
78 Lem kayu Rp. 40,000.00 / kg
79 Plywood Rp. 72,500.00 / lbr
80 Mega sungkai Rp. 130,000.00 / lbr
81 Triplek Rp. 72,385.00 / lbr
82 Buis beton U30 Rp. 48,400.00 / m1
83 Tali ijuk/ijuk Rp. 50,000.00 / kg
84 Kabel NYA 1 x 1.5 Rp. 4,200.00 / m1
85 Kabel NYA 1 x 2.5 Rp. 6,900.00 / m1
86 Paralon listrik Rp. 8,500.00 / btg
87 Stok kontak + Indoos Rp. 48,000.00 / bh
88 Saklar + Indoos Rp. 38,000.00 / bh
89 Saklar ganda + Indoos Rp. 44,000.00 / bh
90 Lampu SL 18 Watt Rp. 35,000.00 / bh
91 Lampu pijar 25 Watt Rp. 15,000.00 / bh
92 Fitting lampu Rp. 18,000.00 / bh
JADWAL WAKTU PELAKSANAAN
PEKERJAAN
LOKASI
: PEMBANGUNAN RUKO
: INDONESIA Chart Title
TH. ANGG : 2015 Chart Title
BULAN KE 1 BULAN KE 2 BULAN KE 3 BULAN KE 4 BULAN KE 5 BULAN KE 6 BULAN KE 7 BULAN KE 8 BULAN KE 9
NO URAIAN PEKERJAAN TOTAL % MINGGU KEGIATAN PELAKSANAAN
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
A PEKERJAAN PERSIAPAN 68,358,670.16 0.82 0.16 0.16 0.16 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01 0.01
B PEKERJAAN TANAH, PASIR & PAS. BATU KALI 28,496,040.94 0.34 0.17 0.09 0.09
C PEKERJAAN BETON
C.1. BETON SUB STRUCTURE (Elv < +0.00) 377,314,955.73 4.54 0.30 0.68 0.76 0.76 0.76 0.19 0.30 0.61 0.19
C.2. BETON UPPER STRUCTURE (Elv +0.00 - + 891,382,335.70 10.73 0.54 2.15 2.15 2.15 2.15 0.43 0.54 0.64
C.3. BETON UPPER STRUCTURE (Elv +4.00 - + 1,660,497,861.84 19.98 0.17 3.33 3.33 3.33 3.33 3.33 1.50 0.83 0.83
C.4. BETON UPPER STRUCTURE (Elv +8.00 - + 445,337,878.79 5.36 0.54 1.07 1.07 1.07 1.07 0.27 0.27
C.5. BETON TANGGA 110,409,884.42 1.33 0.33 0.33 0.33 0.33
D PEKERJAAN ATAP 608,124,128.85 7.32 0.78 1.05 1.05 1.05 1.05 1.05 0.78 0.52
E PEKERJAAN PASANGAN DINDING 1,130,280,518.36 13.60 0.21 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 1.05 0.84 1.05 1.05 1.05
F PEKERJAAN PLAFOND 577,010,752.25 6.94 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58 0.58
G PEKERJAAN KUSEN, PINTU, JENDELA & KACA 806,581,705.94 9.71 0.91 0.91 1.33 1.21 0.49 1.21 1.21 1.21 1.21
H PEKERJAAN LANTAI 748,291,510.32 9.00 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.75 0.38 0.38 0.75 0.75 0.75
I PEKERJAAN SANITAIR 44,664,174.60 0.54 0.13 0.13 0.13 0.13
J PEKERJAAN PENGECATAN 252,882,929.89 3.04 0.34 0.34 0.17 0.34 0.34 0.17 0.17 0.34 0.34 0.34 0.17
K PEKERJAAN MEKANIKAL
K.1. PENYEDIAAN DAN SUPLAI AIR BERSIH 41,478,903.60 0.50 0.17 0.17 0.17
K.2. INSTALASI PIPA AIR BERSIH 13,594,179.10 0.16 0.03 0.03 0.03 0.03 0.03 0.03
K.3. INSTALASI PIPA AIR BEKAS, AIR KOTOR 60,122,599.50 0.72 0.12 0.12 0.12 0.12 0.12 0.12
K.4. INSTALASI DRAINASI AIR HUJAN 7,556,498.90 0.09 0.02 0.02 0.02 0.02 0.02 0.02
K.5. PEKERJAAN TATA UDARA 17,024,500.00 0.20 0.10 0.10
L PEKERJAAN ELEKTRIKAL
L.1. PENYEDIAAN & DISTRIBUSI LISTRIK 15,750,000.00 0.19 0.06 0.06 0.06
L.2. INSTALASI PANEL TEGANGAN RENDAH 32,675,000.00 0.39 0.13 0.13 0.13
L.3. INSTALASI KABEL TOEVOER 8,120,000.00 0.10 0.03 0.03 0.03
L.4. INSTALASI PENERANGAN 200,473,565.00 2.41 0.40 0.27 0.13 0.27 0.27 0.27 0.27 0.27 0.27
L.5. INSTALASI KABEL TRAY & LADDER 21,810,000.00 0.26 0.13 0.13
M PEKERJAAN LAIN-LAIN/PENDUKUNG
M.1. PEK. SALURAN KELILING 56,849,443.85 0.68 0.17 0.17 0.17 0.17
M.2. PEK. GROUND TANK KAP ±15 M3 32,773,823.59 0.39 0.10 0.10 0.15 0.05
M.3. PEK. HALAMAN PARKIR 52,870,144.15 0.64 0.13 0.13 0.13 0.13 0.06 0.06
JUMLAH 8,310,732,005.49 100.00 0.16 0.16 0.47 0.69 0.77 0.94 1.30 2.15 2.24 2.24 2.32 3.98 4.39 4.92 5.03 5.11 4.51 3.64 4.18 4.04 4.46 4.34 4.19 3.89 3.32 3.08 3.26 3.13 2.95 2.96 2.75 2.78 1.76 1.46 1.04 0.87 0.44 0.07
KOMULATIF RENCANA PELAKSANAAN 0.16 0.33 0.80 1.49 2.25 3.19 4.49 6.65 8.89 11.13 13.45 17.43 21.81 26.73 31.76 36.87 41.38 45.02 49.20 53.24 57.70 62.04 66.22 70.12 73.43 76.51 79.77 82.90 85.86 88.82 91.57 94.35 96.11 97.57 98.62 99.49 99.93 100.0
KOMULATIF REALISASI PELAKSANAAN 0.04 1.02 4.85 8.36 11.73 14.52 18.22 23.04 27.12 29.98 32.68 36.02 39.94 43.4 45.81 47.2 49.76 49.82 53.2 56.64 60.82 64.49 68.94 72.64 75.88 79.24 82.16 85.08 87.69 90.02 92.4 94.23 96.34 98.28 99.26 99.92 100
BIAYA PERALATAN
Bahan bakar Operasional
1 BBM Mobil 240.00 Hr 4
2 Mobil + service 4.00 Bln 4
3 BBM Mesin bore pile 30.00 hr 2
4 Mesin Lift beton 120.00 hr 1
5 Mesin molen beton 150.00 hr 4
6 Mob dan Demob Peralatan 1.00 Ls
7 Peralatan Listrik kabel, lampu lapangan 1.00 Ls
JUMLAH :
BIAYA ENTERTAIN
1 Proyek 8.00 Bln

JUMLAH :
BIAYA UMUM LAPANGAN
1 Biaya Gaji Karyawan
- Project Manager 8.00 Bln
- Adm keuangan dan proyek 8.00 Bln
- Pelaksana 8.00 Bln
- Asst. Pelaksana 8.00 Bln
- Surveyor 8.00 Bln
- Asst. Surveyor 2 orang 8.00 Bln
- Peralatan dan Logistik 8.00 Bln
- Driver 8.00 Bln
- Office boy 8.00 Bln
2 Uang makan
- Site Manager 8.00 Bln
- Adm keuangan dan proyek 8.00 Bln
- Pelaksana 8.00 Bln
- Asst. Pelaksana 8.00 Bln
- Surveyor 8.00 Bln
- Asst. Surveyor 2 orang 8.00 Bln
- Peralatan dan Logistik 8.00 Bln
- Driver 8.00 Bln
- Office boy 8.00 Bln
3 Operasional dan pulsa
- Operasional site manager 8.00 Bln
- Operasional Lapangan 8.00 Bln
4 Alat tulis kantor 8.00 Bln
5 Biaya fak dan komunikasi untuk kantor 8.00 Bln
6 Jamuan direksi / konsultan 8.00 Bln
7 Biaya rutinitas mess 8.00 Bln
JUMLAH :
BIAYA KARYA TAK LANGSUNG
Biaya Sewa Base Camp/Kantor Lapangan
1 Kantor dan Mess Karyawan dan Ops 8.00 Bln
2 Perabot mess karyawan 1.00 Ls
JUMLAH :
unit 6,500 62,400,000
unit 750,000 12,000,000
unit 6,500 4,875,000
unit 6,500 7,800,000
unit 6,500 19,500,000
30,000,000 30,000,000
10,000,000 600,000
137,175,000

15,000,000 120,000,000

120,000,000

4,500,000 36,000,000
2,250,000 18,000,000
3,000,000 24,000,000
2,500,000 20,000,000
2,000,000 16,000,000
1,750,000 14,000,000
2,500,000 20,000,000
1,500,000 12,000,000
1,500,000 12,000,000

800,000 6,400,000
750,000 6,000,000
750,000 6,000,000
500,000 4,000,000
750,000 6,000,000
1,000,000 8,000,000
500,000 4,000,000
500,000 4,000,000
500,000 4,000,000

5,000,000 40,000,000
5,000,000 40,000,000
1,000,000 8,000,000
600,000 4,800,000
2,000,000 16,000,000
1,000,000 8,000,000
337,200,000

4,500,000 36,000,000
2,000,000 2,000,000
38,000,000

632,375,000

Anda mungkin juga menyukai