B PERENCANAAN 108,000,000.00
C PENGAWASAN 81,000,000.00
b. PEMBULATAN 1,500,000,000.00
TERBILANG :
c. TOTAL 1,205,525,266.95
b. PEMBULATAN 1,205,500,000.00
TERBILANG :
SATU MILYAR DUA RATUS LIMA JUTA LIMA RATUS RIBU RUPIAH
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I KSOP TANJUNG LAUT BONTANG
Lokasi : Kota Bontang
Tahun : 2017
### : #REF!
Alkopan
1 4.6 0.6 2 5.52
2 2.3 4.6 2 21.16
3 0.8 6.6 1 5.28
4 6.6 0.6 1 3.96
35.92
Rekap Analia Harga Satuan
(RAHS)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
AN.04.a 1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6)
SNI : 7394:2008
cm (Rabat)
230.00 Kg Semen Portland 2,250.00 517,500.00
0.55 M³ Pasir beton 555,000.00 305,250.00
0.70 M³ Koral 555,000.00 388,500.00
215.00 liter air 135.00 29,025.00
1.200 OH Pekerja 150,000.00 180,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.060 OH Mandor 225,000.00 13,500.00
Jumlah 1,240,275.00 235,050.00 1,475,325.00
AN.04.b 1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)
SNI : 7394:2008
371.00 Kg Semen Portland 2,250.00 834,750.00
0.43 M³ Pasir beton 555,000.00 238,650.00
0.72 M³ Koral 555,000.00 399,600.00
215.00 liter air 135.00 29,025.00
1.200 OH Pekerja 150,000.00 180,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.060 OH Mandor 225,000.00 13,500.00
Jumlah 1,502,025.00 235,050.00 1,737,075.00
AN.04.c 1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c
SNI : 7394:2008
= 0,56
1.000 M3 Beton K-250 Redimix 2,625,000.00 2,625,000.00
0.300 OH Pekerja 150,000.00 45,000.00
0.500 OH Tukang 187,500.00 93,750.00
0.050 OH Kepala Tukang 202,500.00 10,125.00
0.150 OH Mandor 225,000.00 33,750.00
Jumlah 2,625,000.00 182,625.00 2,807,625.00
ANALISA HARGA SATUAN
Kota Bontang
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
AN.07.b 1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm SNI : 2839:2008
0.364 lbr Gypsum board 120,000.00
43,680.00
0.110 kg Paku Gypsum 48,000.005,280.00
0.100 Pack Kompon 45,000.004,500.00
0.028 Roll Fiber Tape 60,000.001,680.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Tukang 187,500.00 9,375.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 55,140.00 26,512.50 81,652.50
AN.07.c 1 m1 Memasang list gypsum profil SNI : 2839:2008
1.050 m' List Plafond Gypsum 50,250.00 52,762.50
0.150 kg Tepung Gypsum 6,750.00 1,012.50
0.060 OH Pekerja 150,000.00 9,000.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.003 OH Mandor 225,000.00 675.00
Jumlah 53,775.00 22,140.00 75,915.00
AN.07.d 1 M2 Pasang Rangka Plafond Metal furring SNI : 2839:2008
1.000 m' Rangka Plafond Metal Furring 165,000.00 165,000.00
Jumlah 165,000.00 - 165,000.00
AN.08 PEKERJAAN PENUTUP LANTAI & DINDING
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)
SATUA
NO URAIAN HARGA (Rp)
N
A UPAH
1 Pekerja Oh 150,000.00
2 Tukang Oh 187,500.00
3 Kepala Tukang Oh 202,500.00
4 Operator Pancang Oh 202,500.00
5 Mandor Oh 225,000.00
B BAHAN
II SEMEN
1 Semen portland Kg 2,250.00 ###
2 Semen warna Kg 3,300.00
3 air ltr 135.00
4 Beton K-250 Redimix M3 2,625,000.00
III BESI
1 Besi beton Kg 33,000.00
2 Kawat bendrat Kg 33,000.00
3 Paku biasa 5cm - 10cm Kg 33,000.00
4 Paku 1 cm - 2,5 cm Kg 30,000.00
5 Paku ulin Kg 42,000.00
6 Paku plywood Kg 55,500.00
7 Paku Payung Kg 50,250.00
8 Paku genteng metal Kg 48,000.00
9 Paku Gypsum Kg 48,000.00
10 Besi profil Kg 33,000.00
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
V KAYU
1 Kayu begisting M3 3,975,000.00
2 Kayu meranti balok M3 3,750,000.00
3 Kayu meranti papan M3 5,475,000.00
4 Kayu bengkirai balok M 3
8,175,000.00
5 Kayu bengkirai papan M 3
7,575,000.00
6 Kayu ulin balok M3 7,260,000.00
7 Kayu ulin papan M3 7,875,000.00
8 Dolken kayu galam Blg 46,875.00
9 Plywood tebal 9 mm Lbr 232,500.00
10 Plywood tebal 4 mm Lbr 97,500.00
11 Gypsum board tebal 9mm Lbr 112,500.00
12 Minyak begisting Ltr 41,250.00
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
VI ATAP
1 Genteng metal Lbr 142,500.00
2 Bubungan Genteng Metal M' 73,500.00
3 Seng Plat
seng BJLS 20 lebar 45 cm m 25,500.00
seng BJLS 20 lebar 55 cm m 27,000.00
seng BJLS 20 lebar 60 cm m 30,000.00
seng BJLS 20 lebar 70 cm m 33,000.00
seng BJLS 20 lebar 80 cm m 34,500.00
seng BJLS 20 lebar 90 cm m 37,500.00
seng BJLS 25 lebar 90 cm m 61,500.00
4 Pasang Kuda - Kuda Baja Ringan M2 375,000.00
5 Sisalation/ aluminium foil M2 9,000.00
6 Atap Zincalume M' 135,000.00
7 Genteng Keramik bh 37,500.00
8 Nok Genteng Keramik bh 26,250.00
9 Bubungan Zincalume M' 78,750.00
10 Genteng Bitumen Lbr 150,000.00
11 Nok Genteng Bitumen M 97,500.00
VII PLAPHOND
Calsi Board 4 mm lembar 131,250.00 Up-1
Calsi Board 9 mm lembar 281,250.00 Up-2
Paku Calsi Board dos 18,000.00 Up-3
Kompon pack 45,000.00 Up-4
Fiber Tape roll 60,000.00 Up-5
List Plafond Gypsum m1 50,250.00 Up-6
Paku Gypsum kg 45,750.00 Up-7
Gypsum Board Lembar 120,000.00 Up-8
Tepung Gypsum kg 6,750.00 Up-9
Rangka Plafond Metal Furring m2 165,000.00 Up-10
Dynabolt bh 6,750.00 Up-11
Ornamen Gypsum kecil m2 150,000.00 Up-12
Oenamen Gypsum Besar bh 180,000.00 Up-13
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
VII KUSEN, PINTU & JENDELA
1 Kusen M' 112,500.00 h-KPJ-01
2 Daun Pintu Unit 1,425,000.00 h-KPJ-02
3 Daun Pintu wc ulin Unit 1,050,000.00 h-KPJ-03
4 Daun Pintu PJ Unit 1,200,000.00 h-KPJ-04
5 Expanyolet bh 300,000.00 h-KPJ-05
6 Lem Kayu kg 18,000.00 h-KPJ-06
7 Rolling Door M2 433,125.00 h-KPJ-07
8 Pintu Lipat (folding Gate) M2 2,165,625.00 h-KPJ-08
9 Rolling door aluminium M2 300,000.00 h-KPJ-09
10 Profil aluminium M' 92,250.00 h-KPJ-10
11 Profil aluminium Daun Jendela M' 67,500.00 h-KPJ-11
12 Plat Aluminium untuk Jalusi M' 45,000.00 h-KPJ-12
13 Prifil Kaca m' 12,000.00 h-KPJ-13
14 Skrup fixer Bh 1,200.00 h-KPJ-14
15 Sealant tube 9,000.00 h-KPJ-15
16 Daun pintu uk 100 cm Bh 1,525,000.00 h-KPJ-16
17 Daun jendela uk 60 cm t = 110 cm Bh 487,500.00 h-KPJ-17
18 Roster Bh 67,500.00 h-KPJ-18
19 Kaca bening tebal 5mm M2 187,500.00 h-KPJ-19
20 Kaca Buram tebal 5mm M2 225,000.00 h-KPJ-20
21 Kaca riben/gelap tebal 5mm M2 195,000.00 h-KPJ-21
22 Kaca bening tebal 8mm M2 232,500.00 h-KPJ-22
23 Kaca riben/gelap tebal 8mm M2 240,000.00 h-KPJ-23
24 Kaca Cermin M2 37,500.00 h-KPJ-24
25 Engsel pintu 4" Bh 75,000.00 h-KPJ-25
26 Engsel jendela 3" Bh 58,500.00 h-KPJ-26
27 Kunci pintu 2 slag Bh 225,000.00 h-KPJ-27
28 Kunci kamar mandi Bh 260,250.00 h-KPJ-28
29 Kunci Silinder Bh 354,000.00 h-KPJ-29
30 Hendel Pintu Bh 300,000.00 h-KPJ-30
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
VIII SANITAIR
1 Pipa PVC Ø 2" M' 32,812.50 Sanitair-01
2 Pipa PVC Ø 1/2" M' 15,000.00 Sanitair-02
3 Pipa PVC Ø 3/4" M' 19,500.00 Sanitair-03
4 Pipa PVC Ø 4" M' 86,625.00 Sanitair-04
5 Pipa PVC Ø 3" M' 110,812.50 Sanitair-05
6 Kran 1/2" Bh 37,500.00 Sanitair-06
7 Seal tape Bh 4,350.00 Sanitair-07
8 Closed Duduk Unit 4,687,500.00 Sanitair-08
9 Closet Jongkok Unit 304,920.00 Sanitair-09
10 Urinoir Unit 2,945,250.00 Sanitair-10
11 Wastafel Unit 1,472,625.00 Sanitair-11
12 Floor drain Bh 37,500.00 Sanitair-12
13 Septictank Biofil+obat kap 2-4org Unit 6,750,000.00 Sanitair-13
14 Septictank Biofil+obat kap 4-6org Unit ### Sanitair-14
15 Tandon air 1.200 L Fiber Unit 2,550,000.00 Sanitair-15
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
IX INSTALASI LISTRIK
1 Lampu SL 8 Watt + Acc Downlight Bh 75,000.00 listrik-01
2 Lampu SL 18 Watt Bh 63,000.00 listrik-02
3 Lampu TL 18 Watt Bh 75,000.00 listrik-03
4 Stop kontak Bh 75,225.00 listrik-04
5 Saklar tunggal Bh 69,300.00 listrik-05
6 Saklar ganda Bh 96,150.00 listrik-06
7 Saklar Empat Bh 102,000.00 listrik-07
8 Fiting lampu Bh 55,440.00 listrik-08
9 Kabel NYM 3 x 2,5 mm m' 11,250.00 listrik-09
10 Pipa pralon 5/8" btg 16,500.00 listrik-10
11 Panel BOX Bh 225,000.00 listrik-11
12 Reflektor + Lampu TL 2x18 Bh 450,000.00 listrik-12
13 Acc Lampu Tl 2x18w Unit 60,000.00 listrik-13
14 Instalasi listrik titik 450,000.00 listrik-14
15 Lampu Gantung Hias Dalam Unit 3,000,000.00 listrik-15
16 Lampu Gantung Hias Luar titik 1,500,000.00 listrik-16
17 Stop Kontak AC Unit 67,500.00 listrik-17
18 MCB Bh 375,000.00 listrik-18
19 Lampu DownLight LED 6 Watt Bh 172,500.00 listrik-19
20 Lampu DownLight LED 3 Watt Bh 127,500.00 listrik-20
21 Lampu Downlight outbow 2 warna LED 6 Wat Bh 337,500.00 listrik-21
22 OutBow Lighting PLC 25 Watt Bh 300,000.00 listrik-22
23 Baret Light 30 Watt Bh 520,000.00 listrik-23
24 Reccessed Downlight 10 Watt Bh 250,000.00 listrik-24
25 Exchaust Fan Bh 325,000.00 listrik-25
26 Pasang Lighting Panel Bh ### listrik-26
27 Garden Light Bh 150,000.00 listrik-27
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang
SATUA
NO URAIAN HARGA (Rp)
N
X CAT
1 Plamir Kayu Kg 30,000.00
2 Plamir Tembok Kg 30,000.00
3 Cat dasar Kayu Kg 60,000.00
4 Cat dasar Tembok Kg 68,205.00
5 Cat tembok (dalam) Kg 126,000.00
6 Cat Tembok (Luar) Kg 138,750.00
7 Cat minyak Kg 83,520.00
8 Cat meni Kg 37,500.00
9 Thiner A spesial Ltr 30,000.00
10 Waterproofing Kg 112,500.00
C Lain - Lain
1 Crane Service 1Jam 28,125.00 Up-LL - 1
2 Hidrolic Jack Hammer 1 Jam 46,875.00 Up-LL - 2
3 Solar Ltr 15,750.00 Up-LL - 3
4 Minyak Pelumas Ltr 52,500.00 Up-LL - 4
5 Sewa Perakitan 1 Jam 15,000.00 Up-LL - 5
6 Sewa Alat Las 1 Jam 9,375.00 Up-LL - 6
7 Kawat las Listrik Kg 37,500.00 Up-LL - 7
8 Upah Bobok kepala mini pile titik 75,000.00 Up-LL - 8
9 Relling Stenlis pipa Ø 3" m' 412,500.00 Up-LL - 9
10 Tulisan Plat Stenlis Unit 7,500,000.00 Up-LL - 10
11 Bak Kontrol Unit 900,000.00 Up-LL - 11
12 Alat bantu Ls 3,000.00 Up-LL - 12
13 Pagar Geser 1 m2 M2 1,350,000.00 Up-LL - 13
14 Pagar Hollow Galvanis M2 900,000.00 Up-LL - 14
15 Tulisan papan Nama Plat Besi' Unit 7,500,000.00 Up-LL - 15
16 1 m Grill Parit M' 300,000.00 Up-LL - 16
17 Plat Papan Nama + Rangka M2 1,200,000.00 Up-LL - 17
18 Non Moven Gotextile M2 12,000.00 Up-LL - 18
SATUA
NO URAIAN HARGA (Rp)
N
D Vegetasi
1 Pupuk Kompos Aktif zak 37,500.00 Up-V -1
2 Top Soil m3 180,000.00 Up-V -2
3 Tanaman Airis polibag 7,500.00 Up-V -3
4 tanaman Pisang - pisang Polibag 37,500.00 Up-V -4
5 Rumput Gajah Mini Polibag 67,500.00 Up-V -5
6 Bayam Merah Polibag 7,500.00 Up-V -6
7 bakung Bunga Putih Polibag 12,750.00 Up-V -7
8 Sambang Dara Polibag 26,250.00 Up-V -8
9 Ararea Polibag 34,500.00 Up-V -9
10 Brokoli Polibag 30,000.00 Up-V -10
11 Karambosa mini Polibag 34,500.00 Up-V -11
12 Pohon Tabe Buya Kuning 3 - 4 m Pohon 390,000.00 Up-V -12
13 Pohon Glodokan Tiang Pohon 300,000.00 Up-V -13
14 Pohon Pucuk Merah 1 - 1,2 m Pohon 172,500.00 Up-V -14
15 Pohon Ketapang kencana Pohon 675,000.00 Up-V -15
16 Pohon Palm Ekor Tupai 3 - 4 m Pohon 675,000.00 Up-V -16
17 Pohon Palm Botol 1 - 1.3 m Pohon 637,500.00 Up-V -17
18 Pohon Palm Ponix 1.2 - 1.8 m Pohon 1,200,000.00 Up-V -18
19 Pohon Kelengkeng 1.2 - 1.8 m Pohon 382,500.00 Up-V -19
20 Pohon Mangga 1.2 - 1.8 m Pohon 382,500.00 Up-V -20
21 Pohon Tabe Buya Daun Besar Pohon 675,000.00 Up-V -21
22 Bunga Lamtana Polibag 57,375.00 Up-V -22
pintu p1
Kusen alumunium
2.1
2.1
7.2
2.4
0.6
Daun Pintu
2.05
1.64
0.8
jendela J1
Kusen alumunium
4.5
2.38
0.56 10.62
2.38
0.8
Daun Jendela
0.34
1.74
1.4
Kaca bening
1.26 0.34 0.4284
0.56 0.675 0.756
1.1844
Jendela J2
6
1.68 9.6
1.92
Daun jendela
3.7
5.38
1.68
Kaca bening
0.785 0.42 0.6594
0.48 0.45 0.432
0.48 0.9 0.432
1.5234
Jendela J3
1.15 4 4.6
6.82
0.37 6 2.22
Kaca Bening
0.37 0.5 0.74
Jendela J4
1.5 3 4.5
0.56 4 2.24
0.48 2 0.96 10.68
1.19 2 2.38
0.2 3 0.6
Daun jendela
1.4 2 2.8
3.48
0.34 2 0.68
Kaca bening
0.443 0.56 0.74424
1.17264
1.26 0.34 0.4284
Jendela J5
2 3 6
0.6 2 1.2 8.55
0.45 3 1.35
Daun Jendela
1.45 2 2.9 3.48
0.29 2 0.58
Kaca Bening
0.6 1.9 1.14
0.29 1.29 0.3741 1.6941
0.4 0.45 0.18
Pintu P3
2.15 3 6.45
0.8 1 0.8 9.75
0.5 5 2.5
Daun Pintu
2.1 0.8 1.68
Kaca bening
0.5 0.475 0.95
Jendela J6
2.15 2 4.3 5.65
0.45 3 1.35
Daun Jendela
1.45 2 2.9 3.48
0.29 2 0.58
Kaca Bening
0.45 0.55 0.2475 0.6216
0.29 1.29 0.3741
Jendela J7
0.95 3 2.85
0.45 3 1.35 5.4
0.6 2 1.2
Kaca Bening
0.6 0.85 0.51 0.87
0.4 0.45 0.36
Bouven 1
0.7 2 1.4 2.4
0.5 2 1
Kaca Buram
0.6 0.4 0.24
Pintu P4
2.15 2 4.3 6.3
2 1 2
Daun Pintu
1 2.1 4.2