Anda di halaman 1dari 59

REKAPITULASI KEGIATAN

Kegiatan : REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I KSOP


TANJUNG LAUT BONTANG
Lokasi : Kota Bontang
Tahun : 2017

NO URAIAN PEKERJAAN JUMLAH BIAYA

A PELAKSANA / FISIK 1,205,500,000.00

B PERENCANAAN 108,000,000.00

C PENGAWASAN 81,000,000.00

D ADMINISTRASI PROYEK 106,000,000.00

a. JUMLAH KEGIATAN TERMASUK PAJAK 1,500,500,000.00

b. PEMBULATAN 1,500,000,000.00

TERBILANG :

SATU MILYAR LIMA RATUS JUTA RUPIAH


REKAPITULASI
RENCANA ANGGARAN BIAYA (RAB)
Kegiatan : REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I KSOP
TANJUNG LAUT BONTANG
Lokasi : Kota Bontang
Tahun : 2017

NO URAIAN PEKERJAAN JUMLAH BIAYA

A PEKERJAAN PENDAHULUAN 5,500,000.00

B PEKERJAAN TANAH & PONDASI 50,095,908.13

C PEKERJAAN BETON 191,900,344.74

D PEKERJAAN DINDING 187,194,798.29

E PEKERJAAN ATAP 240,467,861.25

F PEKERJAAN PLAFOND 125,308,226.45

G PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG 68,737,344.98

H PEK. PENUTUP LANTAI 58,651,245.59

I PEK. SANITAIR 31,052,679.38

J PEKERJAAN INSTALASI LISTRIK 68,989,600.00

K PEKERJAAN CAT-CATAN DAN ASSESORIS 47,750,352.04

L PEKERJAAN LAIN LAIN 20,283,700.00

a. JUMLAH PEKERJAAN FISIK TERMASUK PAJAK 1,095,932,060.86

b. PPN 10% 109,593,206.09

c. TOTAL 1,205,525,266.95

b. PEMBULATAN 1,205,500,000.00

TERBILANG :

SATU MILYAR DUA RATUS LIMA JUTA LIMA RATUS RIBU RUPIAH
RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA


Pekerjaan :
Lokasi : Kota Samarinda
Tahun : 2015
Instansi : Kementrian Keuangan Republik Indonesia

VOLUME/ HARGA SATUAN


NO URAIAN PEKERJAAN Notasi JUMLAH HARGA (Rp)
SATUAN (Rp)
PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.A.W. SYAHRNI
A PEKERJAAN TANAH
1 Urugan Tanah AN.01.d 860.08 M3 290,625.00 249,960,750.00
2 Memadatkan Urugan AN.01.e 860.08 M3 290,625.00 249,960,750.00
Sub Total A 499,921,500.00
B PEKERJAAN LANTAI
1 Lantai Paving Blok segi Enam AN.08.n 190.58 M2 336,225.00 64,077,760.50
2 Pasir Urug Bawah Paving AN.01.b 7.62 M 3
389,250.00 2,967,330.60
3 Pasir urug Halaman Rumah T = 5cm AN.01.b 2.08 M3 389,250.00 807,693.75
4 Cor Rabat Halaman Rumah T = 5cm AN.04.a 2.08 M3 1,475,325.00 3,061,299.38
5 Rolag Bata (Parit) Halaman Rumah AN.02.c 33.40 M3 246,209.09 8,223,383.50
6 Cor Rabat Jalan Taman T = 5cm AN.04.a 1.34 M3 1,475,325.00 1,976,935.50
7 Batu Sikat Jalan Taman AN.08.j 26.80 M2 570,000.00 15,276,000.00
Sub Total B 96,390,403.23
C PEKERJAAN BETON
1 Sloof beton 15/20 M'
Pembesian AN.04.c1 193.05 kg #N/A #N/A
Beton 1:2:3 AN.04.k 3.30 M3 299,747.25 989,435.70
Begisting Sloof AN.04.e 43.51 M2 52,027.50 2,263,820.58
Sub Total C #N/A
D PEKERJAAN DINDING (Pot Taman)
1 Pas. Dinding bata merah 1 : 4 AN.05.b 40.18 M2 250,949.06 10,083,133.33
2 Plesteran 1 : 4 AN.05.d 28.70 M2 102,577.50 2,943,974.25
3 Acian AN.05.e 28.70 M 2
60,337.50 1,731,686.25
4 Pas batu Alam AN.08.f 28.70 M2 510,225.00 14,643,457.50
Sub Total D 29,402,251.33
E SANITAIR
1 BAK Kontrol Halaman Rumah Up-LL - 11 1.00 Unit 900,000.00 900,000.00
2 Pipa Air Limbah Lingkungan rumah Ø 4' AN.09.c 33.30 M' 152,538.75 5,079,540.38
Sub Total E 5,979,540.38
F LAIN - LAIN
1 tanaman Pisang - pisang + sampai tumbuh AN.14.s 81.00 Polibag 63,525.00 5,145,525.00
2 Tanaman Airis + Sampai Tumbuh AN.14.r 162.00 Polibag 33,525.00 5,431,050.00
3 Pupuk Kompos AN.14.a 13.55 M2 18,750.00 254,141.25
4 Rumput Gajah Mini AN.14.b 87.92 M2 69,187.50 6,082,965.00
Sub Total F 16,913,681.25
JUMLAH #N/A
PPN 10% #N/A
JUMLAH TOTAL #N/A
PEMBULATAN #N/A
RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA


Pekerjaan :
Lokasi : Kota Samarinda
Tahun : 2015
Instansi : Kementrian Keuangan Republik Indonesia

VOLUME/ HARGA SATUAN


NO URAIAN PEKERJAAN Notasi JUMLAH HARGA (Rp)
SATUAN (Rp)
PEMBANGUNAN PAGAR KELILING RUMAG DINAS TYPE 70
A PEKERJAAN TANAH & PONDASI
1 Galian Tanah AN.01.a 12.66 M3 118,125.00 1,494,990.00
2 Pancang/ Cerucuk ulin 10/10 x 3M (lokal) AN.03.b 95.00 Ttk 304,200.00 28,899,000.00
3 Pondasi batu gunung AN.02.b 140.24 M3 1,535,437.50 215,331,443.98
Sub Total A 245,725,433.98
B PEK. SANITAIR
1 Pemasangan pipa air Ø2' AN.09.l 28.00 m' 2,026,140.00 56,731,920.00
Sub Total B 56,731,920.00
C PEKERJAAN BETON
1 Sloof beton 13/13 M'
Pembesian AN.04.c1 222.87 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 1.38 M3 299,747.25 412,907.53
Begisting Sloof AN.04.e 21.19 M2 52,027.50 1,102,598.00
2 Balok Latai 13/13 M'
Pembesian AN.04.c1 320.59 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 2.00 M3 299,747.25 600,288.83
Begisting Balok AN.04.i 30.49 M2 328,931.63 10,027,480.59
3 Kolom beton 25/50 M'
Pembesian AN.04.c1 111.53 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 3.50 M3 299,747.25 1,049,115.38
Begisting Kolom AN.04.f 31.50 M2 #N/A #N/A
4 Kolom Beton KP M'
Pembesian AN.04.c1 227.23 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 1.09 M3 299,747.25 326,739.49
Begisting Kolom AN.04.f 16.77 M2 #N/A #N/A
Sub Total C #N/A
D PEKERJAAN DINDING
1 Pas. Dinding bata merah 1 : 4 AN.05.b 238.81 M2 250,949.06 59,930,199.60
2 Plesteran 1 : 4 AN.05.d 339.63 M2 102,577.50 34,838,232.20
3 Acian AN.05.e 381.63 M2 60,337.50 23,026,503.59
4 Pas batu Alam AN.08.f 91.15 M2 510,225.00 46,507,008.75
Sub Total D 164,301,944.14
E PEKERJAAN CAT
1 Pengecatan Dinding Luar AN.13.b 381.63 M2 70,421.25 26,874,748.96
Sub Total E 26,874,748.96
F LAIN - LAIN
1 Pagar Geser Up-LL - 13 12.00 M2 1,350,000.00 16,200,000.00
2 Hollow Galvanis Up-LL - 14 21.24 M2
900,000.00 19,116,000.00
Sub Total F 35,316,000.00
RENCANA ANGGARAN BIAYA (RAB)

PEMBANGUNAN RUMAH DINAS ESELON II, III Dan PREASARANA LINGKUNGNA


Pekerjaan :
Lokasi : Kota Samarinda
Tahun : 2015
Instansi : Kementrian Keuangan Republik Indonesia

VOLUME/ HARGA SATUAN


NO URAIAN PEKERJAAN Notasi JUMLAH HARGA (Rp)
SATUAN (Rp)
G PEKERJAAN PAPAN NAMA
1 Pas. Dinding bata merah 1 : 4 AN.05.b 9.90 M2 250,949.06 2,484,395.72
2 Plesteran 1 : 4 AN.05.d 4.49 M 2
102,577.50 460,572.98
3 Acian AN.05.e 4.49 M2 60,337.50 270,915.38
4 Pas batu Alam AN.08.f 8.38 M2 510,225.00 4,275,685.50
5 Poer Plat M'
Pembesian AN.04.c1 1.07 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 0.08 M3 299,747.25 22,481.04
Begisting pondasi AN.04.f 0.15 M2 151,890.00 22,783.50
6 Kolom beton 15/15 M'
Pembesian AN.04.c1 103.65 kg #N/A #N/A
Beton Cam 1:2:3 AN.04.k 0.72 M3 299,747.25 215,818.02
Begisting Kolom AN.04.f 21.12 M2 #N/A #N/A
7 Plat Papan Nama + Rangka Up-LL - 17 1.74 M2 1,200,000.00 2,088,000.00
8 Tulisan Papan Nama Plat Besi Up-LL - 15 1.00 Unit 7,500,000.00 7,500,000.00
9 Pohon Taman dan Pagar
Pohon Glodokan Tiang + Sampai Tumbuh AN.14.p 5.00 Phn 326,025.00 1,630,125.00
Pohon Pucuk Merah + Sampai Tumbuh AN.14.i 2.00 Phn 198,525.00 397,050.00
Pohon Ketapang kencana+ Sampai Tumbuh AN.14.q 3.00 Phn 326,025.00 978,075.00
Bunga Lamtana + Sampai Tumbuh AN.14.u 186.00 Polibag 83,400.00 15,512,400.00
Tanah Urug AN.01.d 2.00 M3 290,625.00 581,250.00
Top Soil Up-V -2 0.53 M3 180,000.00 95,400.00

Sub Total F #N/A


JUMLAH #N/A
PPN 10% #N/A
JUMLAH TOTAL #N/A
PEMBULATAN #N/A
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I


KSOP TANJUNG LAUT BONTANG

Lokasi : Kota Bontang


Tahun : 2017

URAIAN VOLUME/ HARGA JUMLAH HARGA


NO Notasi
PEKERJAAN SATUAN SATUAN (Rp) (Rp)
REHABILITASI BANGUNAN A
A PEKERJAAN PENDAHULUAN
1 Pekerjaan persiapan
Pembersihan,Pembongkaran, Pengukuran, penyiapan lahan 1.00 Ls 5,000,000.00 5,000,000.00
Papan Nama Proyek 1.00 Bh 500,000.00 500,000.00
Sub Total A 5,500,000.00
B PEKERJAAN TANAH & PONDASI
1 Pancang Ulin 10/10 + Sunduk Kalang AN.03.b 15.00 M3 304,200.00 4,563,000.00
2 Galian Tanah Pondasi AN.01.a 27.91 M3 118,125.00 3,297,105.00
3 Pondasi Batu Gunung AN.02.b 14.83 M3 1,535,437.50 22,767,851.11
4 Urugan pasir bawah lantai AN.01.b 16.17 M3 389,250.00 6,293,460.17
5 Cor Rabat (Rabat Bawah Lantai) AN.04.l 8.08 M3 1,629,682.50 13,174,491.85
Sub Total B 50,095,908.13
C PEKERJAAN BETON
1 Sloof 15/20 M'
Pembesian AN.04.d' 322.79 kg 37,739.25 12,181,928.06
Beton cam 1:2:3 AN.04.m 1.65 M3 2,171,025.00 3,582,191.25
Begisting Sloof AN.04.g 22.00 M2 115,767.75 2,546,890.50
2 Kolom Beton 13/13 M' ###
Pembesian AN.04.d' 231.69 kg 37,739.25 8,743,828.12
Beton cam 1:2:3 AN.04.m 0.71 M3 2,171,025.00 1,540,993.55
Begisting Kolom AN.04.h 21.84 M2 205,382.63 4,485,556.53
3 RingBalk Beton 13/20 ###
Pembesian AN.04.d' 314.16 kg 37,739.25 11,856,200.59
Beton cam 1:2:3 AN.04.m 1.43 M3 2,171,025.00 3,104,565.75
Begisting RingBalk AN.04.i 22.00 M2 328,931.63 7,236,495.75
4 Balok Latai 11/11
Pembesian AN.04.d' 68.64 Kg 37,739.25 2,590,464.01
Beton cam 1:2:3 AN.04.m 0.21 M3 2,171,025.00 464,968.42
Begisting Balok Latai AN.04.i 3.89 M2 328,931.63 1,280,859.75
5 Balok Gewel
Pembesian AN.04.d' 531.48 Kg 37,739.25 20,057,832.08
Beton cam 1:2:3 AN.04.m 2.16 M3 2,171,025.00 4,696,361.28
Begisting Balok Latai AN.04.i 33.28 M2 328,931.63 10,946,844.48
6 Kanopi
Pembesian AN.04.d' 335.93 kg 37,739.25 12,677,778.33
Beton cam 1:2:3 AN.04.m 4.99 M3 2,171,025.00 10,826,901.68
Begisting Kanopi AN.04.j 49.94 M2 425,869.13 21,266,626.50
7 Dak Atap Beton #REF! M' ###
Pembesian AN.04.d' 433.03 kg 37,739.25 16,342,212.33
Beton cam 1:2:3 AN.04.m 5.22 M3 2,171,025.00 11,324,066.40
Begisting Dak AN.04.j 56.70 M2 425,869.13 24,146,779.39
Sub Total C 191,900,344.74
D PEKERJAAN DINDING
1 Pas. Dinding bata merah 1 : 4 AN.05.b 324.55 M2 250,949.06 81,446,020.13
2 Plesteran 1 : 4 AN.05.d 649.10 M 2
102,577.50 66,583,465.56
3 Acian AN.05.e 649.10 M2 60,337.50 39,165,312.60
Sub Total D 187,194,798.29
E PEKERJAAN ATAP
1 Pek. Rangka kuda-kuda Baja Ringan AN.06.a 446.86 M2 375,000.00 167,573,437.50
2 Pek. Penutup atap Material Bitumen AN.06.j 446.86 M2 129,900.00 58,047,438.75
3 Listplankcalciboard 2 x 30 - rangkap 20 cm AN.06.e 179.80 M 82,575.00 14,846,985.00
Sub Total E 240,467,861.25
F PEKERJAAN PLAFOND
1 Pek. Plafond Calsiboard AN.07.a 26.35 M2 80,497.50 2,121,221.82
2 Pek. Plafond Gypsum AN.07.b 374.35 M2 81,652.50 30,566,764.43
3 Rangka Plafond metal furring AN.07.d 400.70 M2 165,000.00 66,116,036.25
4 pek.List plafond Gipsum AN.07.c 349.13 M 75,915.00 26,504,203.95
Sub Total F 125,308,226.45
G PEK. KUSEN, PINTU, JENDELA & PENGGANTUNG
1 Pintu P1 1.00 Bh 20,265,000.00 20,265,000.00
2 Jendela J1 1.00 Bh 4,750,000.00 4,750,000.00
3 Jendela J2 1.00 Bh 6,560,000.00 6,560,000.00
4 Jendela J3 1.00 Bh 8,812,344.98 8,812,344.98
5 Jendela J4 5.00 Bh 5,150,000.00 25,750,000.00
6 Bouven 4.00 Bh 650,000.00 2,600,000.00
Sub Total G 68,737,344.98
H PEK. PENUTUP LANTAI
1 Pas. Keramik Lantai uk 40/40 AN.08.a 142.99 M2 300,525.00 42,970,927.76
2 Pas. Keramik lantai uk 30/30 AN.08.q 6.15 M2 230,939.50 1,420,277.93
3 Pas. Keramik Km/Wc lantai uk 20/20 AN.08.b 9.22 M2 294,289.50 2,713,113.76
4 Pas. Dinding keramik km/wc uk 20/40 AN.08.c 49.29 M2 234,284.10 11,546,926.15
Sub Total H 58,651,245.59
I PEK. SANITAIR
1 Pemasangan pipa air bersih 1/2" AN.09.a 16.00 m' 36,270.00 580,320.00
2 Pemasangan pipa 3" AN.09.d 27.00 m' 190,029.38 5,130,793.13
3 Pemasangan pipa 4" AN.09.c 15.00 m' 152,538.75 2,288,081.25
4 Kran Shower AN.09.g 1.00 bh 248,400.00 248,400.00
5 Wastafel AN.09.l 2.00 Bh 2,026,140.00 4,052,280.00
6 Jet washer AN.09.h 2.00 Bh 173,400.00 346,800.00
7 Flor drain Km/Wc AN.09.f 4.00 Bh 60,900.00 243,600.00
8 Pemasangan klosed duduk AN.09.j 2.00 Bh 5,706,202.50 11,412,405.00
10 Septictank biofil + Resapan Sanitair-13 1.00 Unit 6,750,000.00 6,750,000.00
Sub Total H 31,052,679.38
J PEKERJAAN INSTALASI LISTRIK
1 OutBow Lighting PLC 25 Watt listrik-22 6.00 Bh 300,000.00 1,800,000.00
2 Baret Light 30 Watt listrik-23 12.00 Bh 520,000.00 6,240,000.00
3 Reccessed Downlight 10 Watt listrik-24 25.00 Bh 250,000.00 6,250,000.00
4 Saklar tunggal listrik-05 7.00 Bh 69,300.00 485,100.00
5 Saklar ganda listrik-06 14.00 Bh 96,150.00 1,346,100.00
6 Telephone socket listrik-17 7.00 Bh 67,500.00 472,500.00
7 Stop Kontak AC listrik-17 4.00 Bh 67,500.00 270,000.00
8 Stop Kontak listrik-04 4.00 Bh 75,225.00 300,900.00
9 Exchaust Fan listrik-25 6.00 Bh 325,000.00 1,950,000.00
10 Titik Lampu + Instalasi listrik-14 68.00 titik 450,000.00 30,600,000.00
11 Stop Kontak + Instalasi listrik-14 15.00 titik 450,000.00 6,750,000.00
12 Pasang Lighting Panel listrik-26 1.00 Bh 12,300,000.00 12,300,000.00
13 Pasang Panel box listrik-11 1.00 Bh 225,000.00 225,000.00
14 Garden Light listrik-27 4.00 Bh 150,000.00 600,000.00
Sub Total J 68,989,600.00
K PEKERJAAN CAT-CATAN DAN ASSESORIS
1 Cat dinding baru (Dinding Luar ) AN.13.b 177.81 M2 70,421.25 12,521,919.36
2 Cat dinding baru (Dinding Dalam ) AN.13.c 185.83 M2 65,831.25 12,233,190.78
3 Cat listplank AN.13.e 53.94 M2 38,772.60 2,091,394.04
4 Cat Plafond AN.13.d 400.70 M2 36,477.60 14,616,692.87
5 Waterproofing AN.13.f 53.23 M2 118,113.00 6,287,154.99
Sub Total K 47,750,352.04
L PEKERJAAN LAIN LAIN
1 Pipa GIP dia. 50 mm 39.6 M 50,000.00 1,980,000.00
2 ACP ( Alumunium Composite Panel ) 35.92 M2 325,000.00 11,674,000.00
3 Secondary Skin Kayu Bengkirai 18.942 M2 350,000.00 6,629,700.00
Sub Total K 20,283,700.00
JUMLAH 1,095,932,060.86
RENCANA ANGGARAN BIAYA (RAB)

Kegiatan : REHABILITASI BANGUNAN KANTOR UNIT PENYELENGGARA PELABUHAN KELAS I KSOP TANJUNG LAUT BONTANG
Lokasi : Kota Bontang
Tahun : 2017
### : #REF!

URAIAN VOLUME/ HARGA JUMLAH HARGA


NO Notasi
PEKERJAAN SATUAN SATUAN (Rp) (Rp)
PENINGGIAN LAHAN KOMPLEKS, PEMB JALAN LINGKUNGAN DAN LAND SCAPING JL.JUANDA
A PEKERJAAN TANAH & PONDASI
1 Pancang/ Cerucuk ulin 10/10 x 3M (lokal) AN.03.b 98.00 Ttk 304,200.00 29,811,600.00
2 Urugan pasir bawah lantai AN.01.b 9.62 M3 389,250.00 3,743,574.90
3 Pondasi batu gunung AN.02.b 221.25 M 3
1,535,437.50 339,711,708.28
4 Cor Rabat (Rabat Bawah Lantai) AN.04.a 9.62 M3 1,475,325.00 14,188,798.03
5 Galian Tanah AN.01.a 27.99 M3 118,125.00 3,306,791.25
6 Urugan Kembali AN.01.c 4.64 M3 39,375.00 182,822.46
7 Urugan tanah AN.01.d #REF! M3 290,625.00 #REF!
Sub Total A #REF!
B PEKERJAAN BETON
1 Sloof beton 13/20 M'
Pembesian AN.04.d' 339.79 kg 37,739.25 12,823,502.83
Beton cam 1:3:5 AN.04.l 2.95 M3 1,629,682.50 4,803,684.73
Begisting Sloof AN.04.g 45.35 M2 115,767.75 5,249,835.93
2 Kolom beton K1 M'
Pembesian AN.04.d' 90.58 kg 37,739.25 3,418,560.92
Beton cam 1:3:5 AN.04.l 2.42 M3 1,629,682.50 3,935,683.24
Begisting Kolom AN.04.h 25.76 M2 205,382.63 5,290,656.42
3 Kolom Beton KP M'
Pembesian AN.04.d' 155.54 kg 37,739.25 5,869,915.36
Beton cam 1:3:5 AN.04.l 0.41 M3 1,629,682.50 660,999.22
Begisting Kolom AN.04.h 6.24 M2 205,382.63 1,281,587.58
Sub Total B 43,334,426.23
C PEKERJAAN DINDING
1 Pas. Dinding bata merah 1 : 4 AN.05.b 151.40 M2 250,949.06 37,993,688.06
2 Plesteran 1 : 4 AN.05.d 302.80 M2 102,577.50 31,060,467.00
3 Acian AN.05.e 302.80 M2 60,337.50 18,270,195.00

Sub Total C 87,324,350.06


D PEK. PENUTUP LANTAI
1 Pas Bt Alam (dinding pondasi) AN.08.f 57.60 M2 510,225.00 29,386,919.10
2 Pas Bt Alam (Jalan masul) AN.08.f 41.60 M2 510,225.00 21,225,360.00
3 Pas Bt Sikat AN.08.j 93.15 M2 570,000.00 53,096,697.00
Sub Total D 103,708,976.10
E PEK. SANITAIR
1 Pemasangan pipa air Hujan 2" AN.09.n 12.00 m' 69,129.38 829,552.50
Sub Total E 829,552.50
JUMLAH #REF!
PPN 10% #REF!
JUMLAH TOTAL #REF!
PEMBULATAN #REF!
rehab

Jenis Pekerjaan : Pancang Ulin 10/10 + sunduk kalang sudah


Satuan : Titik
No Uraian Volume Ket
1 Pancang Ulin 15 Titik

Jenis Pekerjaan : Galian Tanah sudah


Satuan : m3
No Panjang Lebar Tinggi Titik Volume ket
1 2.68 0.60 0.80 1.00 1.29 m3
2 4.40 0.60 0.80 1.00 2.11 m3
3 3.44 0.60 0.80 2.00 3.30 m3
4 5.19 0.60 0.80 1.00 2.49 m3
5 4.00 0.60 0.80 4.00 7.68 m3
6 4.75 0.60 0.80 1.00 2.28 m3
7 8.15 0.60 0.80 1.00 3.91 m3
8 6.35 0.60 0.80 1.00 3.05 m3
9 1.50 0.60 0.80 1.00 0.72 m3
10 2.25 0.60 0.80 1.00 1.08 m3
Total 27.91 m3

Jenis Pekerjaan : Pasangan Batu Gunung sudah


Satuan : m3
No Uraian Panjang Lebar (atas)
Lebar (bawah) Tinggi Luas Titik Volume Ket
1 type a 2.68 0.30 0.55 0.60 0.26 1.00 0.68 m3
2 type b 4.40 0.30 0.55 0.60 0.26 1.00 1.12 m3
3 type c 3.44 0.30 0.55 0.60 0.26 2.00 1.75 m3
4 type d 5.19 0.30 0.55 0.60 0.26 1.00 1.32 m3
5 type e 4.00 0.30 0.55 0.60 0.26 4.00 4.08 m3
6 type f 4.75 0.30 0.55 0.60 0.26 1.00 1.21 m3
7 type g 8.15 0.30 0.55 0.60 0.26 1.00 2.08 m3
8 type h 6.35 0.30 0.55 0.60 0.26 1.00 1.62 m3
9 type i 1.50 0.30 0.55 0.60 0.26 1.00 0.38 m3
10 type j 2.25 0.30 0.55 0.60 0.26 1.00 0.57 m3
Total 14.83 m3

Jenis Pekerjaan : Tanah urug kembali sudah


Satuan : m3
No Panjang Titik Volume ket
1 Galian Tanah 27.91 1.00 27.91 m3
2 Batu Gunung 14.83 1.00 14.83 m3
Total 13.08 m3

Jenis Pekerjaan : Pasir Urug Bawah Lantai sudah


Satuan : m3
No Panjang Lebar Tinggi Titik Volume ket
1 3.44 2.68 0.10 1.00 0.92 m3
2 6.84 4.40 0.10 1.00 3.01 m3
3 6.50 4.75 0.10 1.00 3.09 m3
4 8.15 7.85 0.10 1.00 6.40 m3
5 1.50 3.79 0.10 1.00 0.57 m3
6 5.95 3.67 0.10 1.00 2.18 m3
Total 16.17 m3

Jenis Pekerjaan : Cor Lantai sudah


Satuan : m3
No Panjang Lebar Tinggi Titik Volume ket
1 3.44 2.68 0.05 1.00 0.46 m3
2 6.84 4.40 0.05 1.00 1.50 m3
3 6.50 4.75 0.05 1.00 1.54 m3
4 8.15 7.85 0.05 1.00 3.20 m3
5 1.50 3.79 0.05 1.00 0.28 m3
6 5.95 3.67 0.05 1.00 1.09 m3
Total 8.08 m3

Jenis Pekerjaan : Sloof 15/20 sudah


Satuan : kg,m3,m2
Besi Sloof
Besi D = 12 55.05 0.8878
a.Unit 4.00 195.48
Besi D = 10 0.59 0.6165
b.Unit 350.00 127.31
Koefisienbesi 0.006165 Total 322.79 Kg
Titik 1.00 322.79 Kg
Beton
55.00 0.15 0.20 1.65 M3
Titik 1.00 1.65 M3
Begisting
55.00 0.40 22.00 M2
Titik 1.00 22.00 M2
Pembesian : 322.79 Kg
Beton : 1.65 m3
Begisting : 22.00 m2

Jenis Pekerjaan : kolom 13/13 sudah


Satuan : kg,m3,m2
Besi Kolom
Besi D = 12 3.80 0.8878
a.Unit 4.00 13.49
Besi D = 10 0.41 0.6165
b.Unit 23.00 5.81
Koefisienbesi 0.006165 Total 19.31 Kg
Titik 12.00 231.69 Kg
Beton
3.50 0.13 0.13 0.06 M3
Titik 12.00 0.71 M3
Begisting
3.50 0.52 1.82 M2
Titik 12.00 21.84 M2
Pembesian : 231.69 Kg
Beton : 0.71 m3
Begisting : 21.84 m2

Jenis Pekerjaan : Ringbalk 13/20 sudah


Satuan : kg,m3,m2
Besi Ringbalk
Besi D = 12 55.05 0.8878
a.Unit 4.00 195.48
Besi D = 10 0.55 0.6165
b.Unit 350.00 118.68
Koefisienbesi 0.006165 Total 314.16 Kg
Titik 1.00 314.16 Kg
Beton
55.00 0.13 0.20 1.43 M3
Titik 1.00 1.43 M3
Begisting
55.00 0.40 22.00 M2
Titik 1.00 22.00 M2
Pembesian : 314.16 Kg
Beton : 1.43 m3
Begisting : 22.00 m2

Jenis Pekerjaan : Balok Gewel 13/13 sudah


Satuan : kg,m3,m2
Balok Gewel
Besi D = 10 128.40 0.6165
a.Unit 4.00 316.63
Besi D = 10 0.41 0.6165
b.Unit 850.00 214.85
Koefisienbesi 0.006165 Total 531.48 Kg
Titik 1.00 531.48 Kg
Beton
128.00 0.13 0.13 2.16 M3
Titik 1.00 2.16 M3
Begisting
128.00 0.26 33.28 M2
Titik 1.00 33.28 M2
Pembesian : 531.48 Kg
Beton : 2.16 m3
Begisting : 33.28 m2

Jenis Pekerjaan : Balok Latai 11/11 sudah


Satuan : kg,m3,m2
Besi Balok latai type a
Besi D = 10 13.70 0.6165
a.Unit 4.00 33.78
Besi D = 10 0.33 0.6165
b.Unit 90.00 18.31
Koefisienbesi 0.006165 Total 52.09 Kg
Titik 1.00 52.09 Kg
Beton
13.50 0.11 0.11 0.16 M3
Titik 1.00 0.16 M3
Begisting
13.50 0.22 2.97 M2
Titik 1.00 2.97 M2
Besi Balok latai type b
Besi D = 10 4.40 0.6165
a.Unit 4.00 10.85
Besi D = 10 0.33 0.6165
b.Unit 28.00 5.70
Koefisienbesi 0.006165 Total 16.55 Kg
Titik 1.00 16.55 Kg
Beton
4.20 0.11 0.11 0.05 M3
Titik 1.00 0.05 M3
Begisting
4.20 0.22 0.92 M2
Titik 1.00 0.92 M2
Pembesian : 68.64 Kg
Beton : 0.21 m3
Begisting : 3.89 m2
Jenis Pekerjaan : Kanopi sudah
Satuan : kg,m3,m2
Besi Kanopi
Besi D = 10 1.50 0.6165
a.Unit 90.00 83.23
Besi D = 10 13.50 0.6165
b.Unit 10.00 83.23
Koefisienbesi 0.006165 Total 166.46 Kg
Titik 1.00 166.46 Kg
Beton
0.13 1.50 13.50 2.63 M3
Titik 1.00 2.63 M3
Begisting
0.13 30.00 3.90 M2
Titik 1.00 3.90 M2
1.50 13.50 20.25 M2
Titik 1.00 20.25 M2
Besi Kanopi
Besi D = 10 0.50 0.6165
a.Unit 90.00 27.74
Besi D = 10 13.50 0.6165
b.Unit 3.00 24.97
Koefisienbesi 0.006165 Total 52.71 Kg
Titik 1.00 52.71 Kg
Beton
0.13 0.50 10.70 0.70 M3
Titik 1.00 0.70 M3
Begisting
0.13 22.40 2.91 M2
Titik 1.00 2.91 M2
0.50 10.70 5.35 M2
Titik 1.00 5.35 M2
Besi Kanopi dudukan
Besi D = 10 0.50 0.6165
a.Unit 1.00 0.31
Besi D = 10 0.20 0.6165
b.Unit 3.00 0.37
Koefisienbesi 0.006165 Total 0.68 Kg
Titik 3.00 2.03 Kg
Beton
0.13 0.50 0.20 0.01 M3
Titik 3.00 0.04 M3
Begisting
0.13 1.40 0.18 M2
Titik 3.00 0.55 M2
Besi Kanopi
Besi D = 10 0.50 0.6165
a.Unit 28.00 8.63
Besi D = 10 4.20 0.6165
b.Unit 3.00 7.77
Koefisienbesi 0.006165 Total 16.40 Kg
Titik 1.00 16.40 Kg
Beton
0.10 0.50 4.20 0.21 M3
Titik 1.00 0.21 M3
Begisting
0.10 9.40 0.94 M2
Titik 1.00 0.94 M2
0.50 4.20 2.10 M2
Titik 1.00 2.10 M2
Besi Kanopi
Besi D = 10 1.50 0.6165
a.Unit 53.00 49.01
Besi D = 10 8.00 0.6165
b.Unit 10.00 49.32
Koefisienbesi 0.006165 Total 98.33 Kg
Titik 1.00 98.33 Kg
Beton
0.10 1.50 8.00 1.20 M3
Titik 1.00 1.20 M3
Begisting
0.10 19.00 1.90 M2
Titik 1.00 1.90 M2
1.50 8.00 12.00 M2
Titik 1.00 12.00 M2
Pembesian : 335.93 Kg
Beton : 4.99 m3
Begisting : 49.94 m2
Jenis Pekerjaan : Dak Atap sudah
Satuan : kg,m3,m2
Besi Dak Atap
Besi D = 10 3.20 0.6165
a.Unit 37.00 72.99
Besi D = 10 5.60 0.6165
b.Unit 21.00 72.50
Koefisienbesi 0.006165 Total 145.49 Kg
Titik 1.00 145.49 Kg
Beton
0.10 3.20 5.60 1.79 M3
Titik 1.00 1.79 M3
Begisting
0.10 17.60 1.76 M2
Titik 1.00 1.76 M2
3.20 5.60 17.92 M2
Titik 1.00 17.92 M2
Besi Dak Atap
Besi D = 10 3.30 0.6165
a.Unit 70.00 142.41
Besi D = 10 10.70 0.6165
b.Unit 22.00 145.12
Koefisienbesi 0.006165 Total 287.54 Kg
Titik 1.00 287.54 Kg
Beton
0.10 3.20 10.70 3.42 M3
Titik 1.00 3.42 M3
Begisting
0.10 27.80 2.78 M2
Titik 1.00 2.78 M2
3.20 10.70 34.24 M2
Titik 1.00 34.24 M2
Pembesian : 433.03 Kg
Beton : 5.22 m3
Begisting : 56.70 m2

Jenis Pekerjaan : Pas. Dinding bata


Satuan : m2
No Uraian panjang Tinggi Unit luas ket
Ruang Rapat
1 type a 3.79 4.00 2.00 30.28 m2
2 type b 8.02 4.00 1.00 32.08 m2
Bagian Toilet Ruang Rapat
3 type c 6.22 4.00 1.00 24.88 m2
4 type d 1.37 4.00 1.00 5.48 m2
5 type e 2.12 4.00 1.00 8.48 m2
Toilet Bagian depan
6 type f 2.55 4.00 3.00 30.60 m2
7 type g 1.50 4.00 4.00 24.00 m2
Ruang Pelayanan Terpadu
8 type h 4.27 4.00 2.00 34.16 m2
9 type i 0.77 4.00 1.00 3.08 m2
Ruang KA tata usaha
10 type j 1.44 4.00 1.00 5.74 m2
11 1.21 4.00 1.00 4.82 m2
12 4.62 4.00 1.00 18.48 m2
Tambahan
11 4.40 6.50 1.00 28.60 m2
12 4.40 4.00 1.00 17.60 m2
13 1.60 6.00 1.00 9.60 m2
14 1.00 13.00 2.00 26.00 m2
15 1.40 13.00 2.00 36.40 m2
16 1.10 13.50 1.00 14.85 m2
17 0.90 13.50 1.00 12.15 m2
18 1.80 12.30 1.00 22.14 m2
19 1.00 10.70 1.00 10.70 m2
20 0.60 8.20 2.00 9.84 m2
Total a 409.96 m2 187.88
Pengurangan
1 J1 0.90 1.60 9.00 12.96 M2
2 Bouven 2.70 5.00 4.00 54.00 m2
3 0.78 2.10 2.00 3.28 m2
4 0.98 2.10 1.00 2.06 m2
5 2.10 3.50 1.00 7.35 m2
6 0.90 1.60 4.00 5.76
Total b 85.40 m2
Total a-b 324.55 m2

Jenis Pekerjaan : Plesteran


Satuan : m2
No Uraian Luas Pas.bTitik luas ket
1 Bagian dinding 324.55 2.00 649.10 m2
Total 649.10 m2

Jenis Pekerjaan : Acian


Satuan : m2
No Uraian titik luas ket 6.3
1 Plesteran 649.10 1.00 649.10 m2 3.15
Total 649.10 m2

Jenis Pekerjaan : Cat Dalam


Satuan : m2
No Uraian Panjang tinggi titik luas ket
Toilet
1 2.55 3.50 4.00 35.70 m2
2 1.59 3.50 4.00 22.26 m2
3 6.71 3.50 1.00 23.49 m2
4 4.27 3.50 3.00 44.84 m2
5 3.80 3.50 1.00 13.30 m2
6 3.53 3.50 1.00 12.36 m2
7 4.62 3.50 1.00 16.17 m2
8 4.09 3.50 2.00 28.60 m2
9 8.02 3.50 1.00 28.07 m2
10 3.97 3.50 1.00 13.90 m2
11 1.50 3.50 2.00 10.50 m2
12 1.37 3.50 1.00 4.80 m2
13 2.25 3.50 1.00 7.88 m2
total 261.84 m2
Pengurangan
1 pintu 0.78 2.10 2.00 3.28 m2
2 keramik dindin 2.55 2.00 3.00 15.30 m2
3 keramik dindin 1.59 2.00 2.00 6.36 m2
4 keramik dindin 0.80 2.00 2.00 3.20 m2
5 pintu p1 2.00 3.50 1.00 7.00 m2
6 J2 4.20 3.50 1.00 14.70 m2
7 3.78 3.50 1.00 13.21 m2
0.90 1.60 9.00 12.96 m2
total 76.01 m2
Total 185.83 m2
Jenis Pekerjaan : Cat luar
Satuan : m2
No Uraian Panjang tinggi titik luas ket Panjang Tinggi
1 type a 19.07 3.50 1.00 66.73 m2 Pintu P1 3 4
2 type b 0.55 3.50 1.00 1.93 m2 Jendela J1 1 3.5
3 type c 4.88 3.50 1.00 17.08 m2 J2 4.2 2.8
4 type d 1.00 3.50 1.00 1.00 m2 J3 6.8 3.2
5 type e 13.50 3.50 1.00 13.50 m2 J4 1.2 3.2
6 bagian atas 187.88 1.00 187.88 m2 Bouven 2.7 5
7 8.28 3.50 1.00 8.28 m2
8 4.00 3.50 1.00 4.00 m2
9 7.95 3.50 1.00 7.95 m2
total 308.34 m2
Pengurangan
1 P1 2.10 3.50 1.00 7.35 m2
2 J1 1.00 3.50 1.00 3.50 m2
3 J2 4.20 2.80 1.00 11.76 m2
4 J3 6.80 3.20 1.00 21.76 M2
5 J4 1.20 3.20 5.00 19.20 m2
6 Bouven 2.70 5.00 4.00 54.00 m2
7 0.90 1.60 9.00 12.96 m2
total 130.53 m2
Total 177.81 m2

Jenis Pekerjaan : Rangka Plafond sudah


Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 5.49 2.37 1.00 13.01 m2
2 type b 4.09 2.97 3.00 36.44 m2
3 type c 5.03 2.50 1.00 12.58 m2
4 type d 6.33 5.40 1.00 34.18 m2
5 e 3.75 3.53 1.00 13.22 m2
6 f 1.37 3.43 1.00 4.70 m2
7 g 1.50 0.77 1.00 1.16 m2
8 h 4.40 3.18 1.00 13.99 m2
9 i 6.71 4.27 1.00 28.65 m2
10 j 3.67 5.81 1.00 21.32 m2
11 k 5.53 5.58 1.00 30.86 m2
12 l 6.36 4.62 1.00 29.38 m2
13 m 4.12 4.17 1.00 17.18 m2
14 n 2.54 8.17 1.00 20.75 m2
15 o 1.50 3.97 1.00 5.96 m2
16 p 3.50 1.52 1.00 5.32 m2
17 q 2.00 3.90 1.00 7.80 m2
18 r 1.78 1.65 1.00 2.94 m2
19 s 3.36 3.87 1.00 13.00 m2
20 t 7.72 8.02 1.00 61.91 m2
Calciboard
1 type a 1.59 2.57 2.00 8.17 m2
2 type b 2.37 5.52 1.00 13.08 m2
3 type c 1.37 3.72 1.00 5.10 m2
Total 400.70 m2

Jenis Pekerjaan : Plafond Gypsum sudah


Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 5.49 2.37 1.00 13.01 m2 15.72 1.00 15.72
2 type b 4.09 2.97 3.00 36.44 m2 14.12 3.00 42.36
3 type c 5.03 2.50 1.00 12.58 m2 15.06 1.00 15.06
4 type d 6.33 5.40 1.00 34.18 m2 23.46 1.00 23.46
5 e 3.75 3.53 1.00 13.22 m2 14.55 1.00 14.55
6 f 1.37 3.43 1.00 4.70 m2 9.60 1.00 9.6
7 g 1.50 0.77 1.00 1.16 m2 4.54 1.00 4.54
8 h 4.40 3.18 1.00 13.99 m2 15.16 1.00 15.16
9 i 6.71 4.27 1.00 28.65 m2 21.96 1.00 21.96
10 j 3.67 5.81 1.00 21.32 m2 18.96 1.00 18.96
11 k 5.53 5.58 1.00 30.86 m2 22.22 1.00 22.22
12 l 6.36 4.62 1.00 29.38 m2 21.96 1.00 21.96
13 m 4.12 4.17 1.00 17.18 m2 16.58 1.00 16.58
14 n 2.54 8.17 1.00 20.75 m2 21.42 1.00 21.42
15 o 1.50 3.97 1.00 5.96 m2 10.94 1.00 10.94
16 p 3.50 1.52 1.00 5.32 m2 10.04 1.00 10.04
17 q 2.00 3.90 1.00 7.80 m2 11.80 1.00 11.8
18 r 1.78 1.65 1.00 2.94 m2 6.86 1.00 6.86
19 s 3.36 3.87 1.00 13.00 m2 14.46 1.00 14.46
20 t 7.72 8.02 1.00 61.91 m2 31.48 1.00 31.48
Total 374.35 m2 349.13
Jenis Pekerjaan : Plafond Calciboard sudah
Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 1.59 2.57 2.00 8.17 m2
2 type b 2.37 5.52 1.00 13.08 m2
3 type c 1.37 3.72 1.00 5.10 m2
Total 26.35 m2

Jenis Pekerjaan : Pengecatan plafond sudah


Satuan : m2
No Uraian Luas titik luas ket
1 Calsiboard 26.35 1.00 26.35 m2
2 Gypsum 374.35 1.00 374.35 m2
Total 400.70 m2

Jenis Pekerjaan : List Plafond sudah


Satuan : m
No Uraian Panjang titik luas ket
1 type a 3.52 2.00 7.04 m'
2 type b 5.37 2.00 10.74 m'
3 type c 2.87 8.00 22.96 m'
4 type d 4.52 2.00 9.04 m'
5 type e 1.37 2.00 2.74 m'
6 type f 1.37 2.00 2.74 m'
7 type g 1.87 2.00 3.74 m'
Total 59.00 m'

Jenis Pekerjaan : Rangka Atap Baja Ringan sudah


Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 12.00 16.00 1.00 192.00 m2
2 type b 7.30 14.60 1.00 106.58 m2
3 type c 10.00 11.70 1.00 117.00 m2
4 type d 2.15 9.15 1.00 19.67 m2
5 type e 4.30 2.70 1.00 11.61 m2
Total 446.86 m2

Jenis Pekerjaan : Atap Bitumen sudah


Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 12.00 16.00 1.00 192.00 m2
2 type b 7.30 14.60 1.00 106.58 m2
3 type c 10.00 11.70 1.00 117.00 m2
4 type d 2.15 9.15 1.00 19.67 m2
5 type e 4.30 2.70 1.00 11.61 m2
Total 446.86 m2

Jenis Pekerjaan : List plank sudah


Satuan : m
No Uraian Panjang titik luas ket
1 type a 12.00 2.00 24.00 m'
2 type b 16.00 2.00 32.00 m'
3 type c 7.30 2.00 14.60 m'
4 type d 14.60 2.00 29.20 m'
5 type e 10.00 2.00 20.00 m'
6 type f 11.70 2.00 23.40 m'
7 type g 2.15 2.00 4.30 m'
8 type h 9.15 2.00 18.30 m'
9 type i 4.30 2.00 8.60 m'
10 type j 2.70 2.00 5.40 m'
Total 179.80 m' 53.94

Jenis Pekerjaan : Keramik lantai 40/40 sudah


Satuan : m2
No Panjang Lebar Titik Volume ket
1 6.84 4.40 1.00 30.10 M2
2 5.49 3.67 1.00 20.15 M2
3 6.49 4.75 1.00 30.83 M2
4 8.02 7.72 1.00 61.91 M2
Total 142.99 m3

Jenis Pekerjaan : Keramik lantai 30/30 sudah


Satuan : m2
No Panjang Lebar Titik Volume ket
1 1.50 4.10 1.00 6.15 M2
Total 6.15 M2

Jenis Pekerjaan : Keramik lantai wc 20/20 sudah


Satuan : m2
No Panjang Lebar Titik Volume ket
1 3.44 2.68 1.00 9.22 M2
2 1.50 3.85 1.00 5.78 M2
Total 9.22 M2

Jenis Pekerjaan : Keramik dinding wc 20/40 sudah


Satuan : m2
No Panjang tinggi Titik Volume ket
1 3.72 2.00 2.00 14.88 M2
2 1.37 2.00 2.00 5.48 M2
3 2.55 2.00 4.00 20.40 M2
4 1.68 2.00 4.00 13.44 M2
Total 54.20 M2
Pengurangan pintu
1 0.78 2.10 1.00 1.64 M2
2 0.78 2.10 2.00 3.28 M2
Total 4.91 M2
Total 49.29 M2

Jenis Pekerjaan : waterprofing sudah


Satuan : m2
No Uraian Panjang lebar titik luas ket
1 type a 3.20 5.60 1.00 17.92 m2
2 type b 3.30 10.70 1.00 35.31 m2
Total 53.23 m2
Panjang Tinggi Unit
Pintu P1 2 3.5 1 7
Jendela J1 1 3.5 1 3.5
J2 4.2 2.8 1 11.76
J3 6.8 3.2 1 21.76
J4 1.2 3.2 5 3.84
Bouven 2.7 5 4 13.5

Alkopan
1 4.6 0.6 2 5.52
2 2.3 4.6 2 21.16
3 0.8 6.6 1 5.28
4 6.6 0.6 1 3.96
35.92
Rekap Analia Harga Satuan
(RAHS)

No Uraian Notasi Nilai Keterangan


A PEKERJAAN TANAH AN.01
1 M³ Galian tanah biasa AN.01.a 118,125.00
1 M³ Urugan Pasir AN.01.b 389,250.00
1 M³ Urugan tanah kembali AN.01.c 39,375.00
1 M³ Urugan tanah AN.01.d 290,625.00
Memadatkan 1 m3 tanah (per 20 cm) AN.01.e 290,625.00
1 Karung Sand bag AN.01.f 40,925.00
B PEKERJAAN PONDASI AN.02
1 M³ Pasang batu kosong (aanstamping) AN.02.a 868,297.50
1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP AN.02.b 1,535,437.50
1 M' Pasang parit rolag bata, 1 Pc : 4 Ps AN.02.c 246,209.09
1 M2 Pasang Non Moven Geotextile AN.02.d 16,725.00
C PEKERJAAN PANCANG AN.03
1 M' Memancang tiang 10x10 AN.03.a 31,950.00
1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m AN.03.b 304,200.00
1m' Pengadaan tiang pancang mini pile 25/25 AN.03.c 531,770.83
Pengadaan 1 tiang pancang mini pile25/25 = 6m AN.03.c1 3,190,625.00
1 m' Memancang Tiang Mini Pile AN.03.d 48,072.92
Memancang 1Tiang Mini Pile 25/25 = 6m AN.03.d.1 288,437.50
D PEKERJAAN BETON AN.04
1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225) AN.04.a 1,475,325.00
1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225) AN.04.b 1,737,075.00
1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 AN.04.c 2,807,625.00
Pembesian 10 kg dengan besi polos atau ulir AN.04.d 377,392.50
Pembesian 1 kg dengan besi polos atau ulir (AN.04.c)/10 AN.04.d' 37,739.25
Pembesian 1 kg jaring kawat baja/wire mesh AN.04.e 52,027.50
1 m2 bekisting untuk pondasi AN.04.f 151,890.00
1 M² Pasang Bekisting untuk sloof 3x Pakai AN.04.g 115,767.75
1 M² Pasang Bekisting untuk kolom 3x Pakai AN.04.h 205,382.63
1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai AN.04.i 328,931.63
1 m2 bekisting untuk plat lantai 2x pakai AN.04.j 425,869.13

1 m2 bekisting untuk tangga 2x Pakai AN.04.k 299,747.25

1 m3 Beton Cor Camp. 1 : 3 : 5 AN.04.l 1,629,682.50

1 m3 Cor Camp. 1 : 2 : 3 AN.04.m 2,171,025.00

1 m3 Pembongkaran betron bertulang AN.04.n 2,149,950.00

E PEKERJAAN DINDING AN.05

1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps AN.05.a 261,759.38


1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps AN.05.b 250,949.06
1 M² Plesteran 1 Pc : 2 Ps AN.05.c 110,041.50
1 M² Plesteran 1 Pc : 4 Ps AN.05.d 102,577.50
1 m2 Acian AN.05.e 60,337.50
Rekap Analia Harga Satuan
(RAHS)

No Uraian Notasi Nilai Keterangan


F PEKERJAAN ATAP AN.06
1 M2 Pasang konstruksi kuda-kuda baja Ringan AN.06.a 375,000.00
1 M² : Pasang atap genteng metal AN.06.b 205,950.00
1 M' : Pasang nok genteng metal AN.06.c 154,837.50
1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm AN.06.d 177,337.50
1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm AN.06.e 82,575.00
1 m2 Pasang aluminium foil/ Sisalation AN.06.f 21,637.50
1 M² : Pasang atap Zincalum AN.06.g 198,300.00
1 M² : Pasang atap genteng Keramik AN.06.h 561,000.00
1 M' : Pasang nok Genteng keramik AN.06.i 370,837.50
1 M² : Pasang atap bahan bitumen AN.06.j 129,900.00
1 M : Pasang nok bahan bitumen AN.06.k 169,087.50
G PEKERJAAN PLAFOND AN.07
1 M² Pasang langit-langit calsiboard AN.07.a 80,497.50
1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm AN.07.b 81,652.50
1 m1 Memasang list gypsum profil AN.07.c 75,915.00
1 M2 Pasang Rangka Plafond Metal furring AN.07.d 165,000.00
H PEKERJAAN PENUTUP LANTAI & DINDING AN.08
1 M² : Pasang Lantai Keramik 40 x 40 cm AN.08.a 300,525.00
1 M² : Pasang Lantai Keramik 20 x 20 cm AN.08.b 294,289.50
1 M² : Pasang Keramik Dinding 20 x 40 cm AN.08.c 234,284.10
1 M' : Pasang Plint Keramik artistik AN.08.d 216,202.50
1 M' : Pasang Plint Keramik lantai AN.08.e 182,452.50
1 M2 : Pasang Dinding Batu tempel/Alam AN.08.f 510,225.00
1 M2 : Pasang Step nosing lantai Tangga AN.08.g 932,452.50
1 M' : List Keramik dinding km/wc 6x20 AN.08.h 50,740.50
1 M² : Pasang Lantai Granit 60 x 60 cm AN.08.i 1,267,191.67
1 M2 PASANGAN Batu Sikat AN.08.j 570,000.00
1 M² : Pasang Lantai Homogenius uk. 60/60 AN.08.k 497,022.83
1 M² : Pasang Lantai Homogenius uk. 80/80 AN.08.l 385,564.50
1 M² : Pasang Lantai Homogenius uk. 100/100 AN.08.m 319,939.50
1 M² : Pasangan Paving Block Segi Enam AN.08.n 336,225.00
1 M² : Pasang Lantai Homogenius uk. 100/100 AN.08.o 319,939.50
1 M² : Pasang Dinding Keramik Border 20 x 20 cm AN.08.p 262,489.50
1 M² : Pasang Dinding Keramik Border 30 x 30 AN.08.q 230,939.50
Rekap Analia Harga Satuan
(RAHS)

No Uraian Notasi Nilai Keterangan


I PEKERJAAN SANITAIR AN.09
Memasang 1 m' pipa PVC type AW Ø ½" AN.09.a 36,270.00
Memasang 1 m' pipa PVC type AW Ø 3/4" AN.09.b 47,595.00
Memasang 1 m' pipa PVC type AW Ø 4" AN.09.c 152,538.75
Memasang 1 m' pipa PVC type AW Ø 3" AN.09.d 190,029.38
Memasang 1 buah kran Ø 3/4" - ½" AN.09.e 61,987.50
Memasang 1 m' pipa PVC type AW Ø 6" AN.09.d' 343,770.00
Memasang 1 unit Pasang floordrain AN.09.f 60,900.00
Memasang 1 unit Pasang Kran Shower AN.09.g 248,400.00
Memasang 1 unit Pasang Jet Washer AN.09.h 173,400.00

Memasang 1 buah Closet jongkok AN.09.i 703,170.00

Memasang 1 buah Closet duduk AN.09.j 5,706,202.50

Memasang 1 buah Urinoir AN.09.k 4,226,325.00

Memasang 1 buah Wastafel AN.09.l 2,026,140.00

1 buah bak mandi batu bata vol. 0,3 m3 AN.09.m 1,001,949.84

Memasang 1 m' pipa PVC type AW Ø 2" AN.09.n 69,129.38

K PEKERJAAN BESI & ALUMINIUM AN.11


1 m2 Pasang pintu rolling door besi AN.11.e 863,775.00
1 m2 Pasang pintu lipat (folding gate) AN.11.f 2,327,985.00
1 m2 Pasang rolling door aluminium AN.11.g 669,000.00
1 m' Pasang kusen pintu/jendela aluminium AN.11.h 120,270.75
1 Kusen Jendela J1 AN.11.i 1,869,525.00
1 Kusen Jendela J2 AN.11.j 2,178,787.50
1 Kusen Jendela J3 AN.11.k 803,130.00
1 Kusen Jendela J4 AN.11.l 1,990,305.00
1 Unit Pintu P1 AN.11.m 4,746,925.00
1 Unit Pintu P2 AN.11.n 1,350,000.00
1 Unit Pintu P3 AN.11.o 5,043,162.50
1 Kusen Jendela J5 AN.11.p 1,891,586.25
1 Kusen Jendela J6 AN.11.q 1,422,967.50
1 Kusen Jendela J7 AN.11.r 696,510.00
Kusen BV1 AN.11.s 312,885.00
1 Unit Pintu P4 AN.11.t 9,671,900.00
Rekap Analia Harga Satuan
(RAHS)

No Uraian Notasi Nilai Keterangan


L PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI AN.12
Pasang 1 buah kunci tanam AN.12.a 323,400.00
1 buah Pasang engsel pintu AN.12.b 108,581.25
1 buah Pasang engsel jendela AN.12.c 63,525.00
1 buah Pasang Grendel jendela AN.12.d 63,525.00
1 buah Pasang grendel pintu AN.12.e 72,525.00
1 buah Pasang hak angin AN.12.f 81,221.25
1 buah Pasang kunci tanam Cilinder AN.12.g 387,581.25
1 buah Pasang kunci (km/wc) AN.12.h 293,831.25
1 buah Pasang Expanyolet AN.12.i 523,875.00
1 buah Pasang Hendel Pintu AN.12.j 411,937.50
1 M3 Pek kusen pintu/jendela kayu Bengkirai AN.12.k 15,392,250.00
1 M3 Pek kusen pintu/jendela kayu Ulin AN.12.l 14,294,250.00
1 Unit P1 (type 120) AN.12.m 6,119,447.02
1 Unit P1 (type 70) AN.12.n 3,474,613.83
1 Unit P2 AN.12.o 2,464,601.05
1 Unit PJ 1 (Type 70) AN.12.p 7,113,433.73
1 Unit PJ(Type 120) AN.12.q 10,007,683.50
1 Unit PJ 2 (Type 70) AN.12.r 3,839,898.95
1 Unit J1 (Type 70) AN.12.s 1,377,812.38
1 Unit J2 (Type 70) AN.12.t 1,326,062.00
1 Unit J3 (Type 70) AN.12.u 1,955,586.74
1 m2 Pasang kaca bening 5 mm AN.12.v 239,831.25
1 m2 Pasang Dinding Roster AN.12.w 1,758,956.25
1 Unit BV.1 (Type 70) AN.12.x 114,738.21
1 Unit BV.2 (Type 70) AN.12.y 249,430.90
1 Unit P3 (type 120) AN.12.z 2,957,552.55
1 Unit J1 (Type 120) AN.12.aa 1,825,916.92
1 Unit J2 (Type 120) AN.12.ab 1,494,437.28
1 Unit J3 (Type 120) AN.12.ac 3,397,186.10
1 Unit Pintu Garasi (Type 120) AN.12.ad 13,307,325.21
M PEKERJAAN PENGECATAN AN.13
1 M² : pengecatan bidang kayu baru, AN.13.a 57,880.20
1 m2 Mengecat bidang tembok baru (luar) AN.13.b 70,421.25
1 m2 Mengecat bidang tembok baru (dalam) AN.13.c 65,831.25
1 m2 Mengecat plafon eternit/ gypsum/Calsiboard AN.13.d 36,477.60
1 m2 Mengecat list plank AN.13.e 38,772.60
1 m2 Waterproofing AN.13.f 118,113.00
Rekap Analia Harga Satuan
(RAHS)

No Uraian Notasi Nilai Keterangan


N PEKERJAAN VEGETASI AN.14
1 m2 Pupus Kompos Aktif AN.14.a 18,750.00
1 m2 Rumput Gajah Mini + Pupus Kompos Aktif AN.14.b 69,187.50
Tanaman Bayam Merah AN.14.c 26,870.63
Tanaman bakung Bunga Putih AN.14.d 32,120.63
Tanaman Sambang Dara AN.14.e 45,620.63
Tanaman Ararea AN.14.f 53,870.63
Tanaman Brokoli AN.14.g 49,370.63
Tanaman Karambosa mini AN.14.h 53,870.63
Tanaman Pohon Pucuk Merah 1 - 1.2 m AN.14.i 198,525.00
Tanaman Pohon Tabe Buya Kuning 3 - 4 m AN.14.j 416,025.00
Tanaman Pohon Palm Ekor Tupai 3 - 4 m AN.14.k 701,025.00
Tanaman Pohon Palm Botol 1 - 1.3 m AN.14.l 663,525.00
Tanaman Pohon Palm Ponix 1.2 - 1.8 m AN.14.m 1,226,025.00
Tanaman Pohon Kelengkeng 1.2 - 1.8 m AN.14.n 408,525.00
Tanaman Pohon Mangga 1.2 - 1.8 m AN.14.o 408,525.00
Tanaman Pohon Glodokan Tiang AN.14.p 326,025.00
Tanaman Pohon ketapang Kencana AN.14.q 326,025.00
Tanaman Airis AN.14.r 33,525.00
Tanaman Pisang - pisang AN.14.s 63,525.00
Tanaman Pohon Tabe Buya Besar AN.14.t 701,025.00
Tanaman Lamtana AN.14.u 83,400.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.01 PEKERJAAN TANAH

AN.01.a 1 M³ Galian tanah biasa SNI : 2835:2008


0.750 OH Pekerja 150,000.00 112,500.00
0.025 OH Mandor 225,000.00 5,625.00
Jumlah 118,125.00 118,125.00
AN.01.b 1 M³ Urugan Pasir SNI : 2835:2008
1.200 M³ Pasir Urug 285,000.00 342,000.00
0.300 OH Pekerja 150,000.00 45,000.00
0.010 OH Mandor 225,000.00 2,250.00
Jumlah 342,000.00 47,250.00 389,250.00
AN.01.c 1 M³ Urugan tanah kembali SNI : 2835:2008
dihitung 1/3 kali pekerjaan galian
0.250 OH Pekerja 150,000.00 37,500.00
0.008 OH Mandor 225,000.00 1,875.00
Jumlah 39,375.00 39,375.00
AN.01.d 1 M³ Urugan tanah SNI : 2835:2008
1.100 M³ Tanah Urug 225,000.00 247,500.00
0.250 OH Pekerja 150,000.00 37,500.00
0.025 OH Mandor 225,000.00 5,625.00
Jumlah 247,500.00 43,125.00 290,625.00
AN.01.e Memadatkan 1 m3 tanah (per 20 cm) SNI : 2835:2008
1.100 M³ Tanah Urug 225,000.00 247,500.00
0.250 OH Pekerja 150,000.00 37,500.00
0.025 OH Mandor 225,000.00 5,625.00
Jumlah 247,500.00 43,125.00 290,625.00
AN.01.f 1 Karung Sand bag SNI : 2835:2008
0.120 M³ Pasir Urug 285,000.00 34,200.00
1.000 Bh Karung 2,000.00 2,000.00
0.030 OH Pekerja 150,000.00 4,500.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 36,200.00 4,725.00 40,925.00
AN.02 PEKERJAAN PONDASI
AN.02.a 1 M³ Pasang batu kosong (aanstamping) SNI : 2836:2008
1.200 M³ Batu gunung 480,000.00 576,000.00
0.300 M³ Pasir urug 285,000.00 85,500.00
0.780 OH Pekerja 150,000.00 117,000.00
0.390 OH Tukang 187,500.00 73,125.00
0.039 OH Kepala Tukang 202,500.00 7,897.50
0.039 OH Mandor 225,000.00 8,775.00
Jumlah 661,500.00 206,797.50 868,297.50
AN.02.b 1 M³ Pasang pondasi batu gunung, 1 Pc : 4 PP SNI : 2836:2008
1.200 M³ Batu Gunung 480,000.00 576,000.00
163.000 Kg Semen portland 2,250.00 366,750.00
0.520 M³ Pasir pasang 375,000.00 195,000.00
1.500 OH Pekerja 150,000.00 225,000.00
0.750 OH Tukang 187,500.00 140,625.00
0.075 OH Kepala Tukang 202,500.00 15,187.50
0.075 OH Mandor 225,000.00 16,875.00
Jumlah 1,137,750.00 397,687.50 1,535,437.50
AN.02.c 1 M' Pasang parit rolag bata, 1 Pc : 4 Ps SNI : 2836:2008
45.500 Bh Bata Merah 1,800.00 81,900.00
8.620 Kg Semen portland 2,250.00 19,395.29
0.018 M³ Pasir pasang 375,000.00 6,613.79
0.600 OH Pekerja 150,000.00 90,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.030 OH Mandor 225,000.00 6,750.00
Jumlah 107,909.09 138,300.00 246,209.09
AN.02.d 1 M2 Pasang Non Moven Geotextile
1.000 M2 Non Moven Gotextile 12,000.00 12,000.00
0.030 OH Pekerja 150,000.00 4,500.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 12,000.00 4,725.00 16,725.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.03 PEKERJAAN PANCANG


AN.03.a 1 M' Memancang tiang 10x10
0.1250 Oh Pekerja 150,000.00 18,750.00
0.0500 Oh Tukang 187,500.00 9,375.00
0.0050 Oh Kepala Tukang 202,500.00 1,012.50
0.0125 Oh mandor 225,000.00 2,812.50
Jumlah 18,750.00 13,200.00 31,950.00
AN.03.b 1 Titik Memancang Cerucuk Ulin 10x10, p = 3 m
0.0300 m3 Kayu ulin balok 7,260,000.00 217,800.00
0.0075 m3 Kayu ulin balok 7,260,000.00 54,450.00
1.0000 m' Memancang tiang (AN.03.a) 31,950.00 31,950.00
Jumlah 272,250.00 31,950.00 304,200.00
AN.03.c 1m' Pengadaan tiang pancang mini pile 25/25
1.0000 m' Tiang pancang mini pile 25/25 525,000.00 525,000.00
0.0333 Jam Crane Service 28,125.00 937.50
0.0222 Oh Pekerja 150,000.00 3,333.33
0.0111 Oh Mandor 225,000.00 2,500.00
Jumlah 525,937.50 5,833.33 531,770.83
AN.03.c1 Pengadaan 1 tiang pancang mini pile25/25 = 6m
6.0000 m' Tiang pancang 531,770.83 3,190,625.00
Jumlah 3,190,625.00 - 3,190,625.00
AN.03.d 1 m' Memancang Tiang Mini Pile
0.1944 jam Hidrolic Jack Hammer 46,875.00 9,114.58
0.1111 Oh Pekerja 150,000.00 16,666.67
0.0556 Oh Tukang 187,500.00 10,416.67
0.0278 Oh Mandor 225,000.00 6,250.00
0.0278 Oh Operator pancang 202,500.00 5,625.00

Jumlah 9,114.58 38,958.33 48,072.92


AN.03.d.1 Memancang 1Tiang Mini Pile 25/25 = 6m
6.0000 m' Tiang pancang 48,072.92 288,437.50
Jumlah 288,437.50 - 288,437.50
AN.04 PEKERJAAN BETON

AN.04.a 1 m3 Beton lantai kerja mutu f'c = 7,4 Mpa (K 100), slump (3-6)
SNI : 7394:2008
cm (Rabat)
230.00 Kg Semen Portland 2,250.00 517,500.00
0.55 M³ Pasir beton 555,000.00 305,250.00
0.70 M³ Koral 555,000.00 388,500.00
215.00 liter air 135.00 29,025.00
1.200 OH Pekerja 150,000.00 180,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.060 OH Mandor 225,000.00 13,500.00
Jumlah 1,240,275.00 235,050.00 1,475,325.00
AN.04.b 1 m3 Beton lantai kerja mutu f'c = 19,3 Mpa (K 225)
SNI : 7394:2008
371.00 Kg Semen Portland 2,250.00 834,750.00
0.43 M³ Pasir beton 555,000.00 238,650.00
0.72 M³ Koral 555,000.00 399,600.00
215.00 liter air 135.00 29,025.00
1.200 OH Pekerja 150,000.00 180,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.060 OH Mandor 225,000.00 13,500.00
Jumlah 1,502,025.00 235,050.00 1,737,075.00
AN.04.c 1 m3 Beton mutu f'c = 21.7 Mpa (K 250), slump (12 ± 2) cm, w/c
SNI : 7394:2008
= 0,56
1.000 M3 Beton K-250 Redimix 2,625,000.00 2,625,000.00
0.300 OH Pekerja 150,000.00 45,000.00
0.500 OH Tukang 187,500.00 93,750.00
0.050 OH Kepala Tukang 202,500.00 10,125.00
0.150 OH Mandor 225,000.00 33,750.00
Jumlah 2,625,000.00 182,625.00 2,807,625.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.04.d Pembesian 10 kg dengan besi polos atau ulir SNI : 7394:2008


10.500 Kg Besi beton 33,000.00 346,500.00
0.150 Kg Kawat bendrat 33,000.00 4,950.00
0.070 OH Pekerja 150,000.00 10,500.00
0.070 OH Tukang 187,500.00 13,125.00
0.007 OH Kepala Tukang 202,500.00 1,417.50
0.004 OH Mandor 225,000.00 900.00
Jumlah 351,450.00 25,942.50 377,392.50
1 kg -------------------> 37,739.25
AN.04.e Pembesian 1 kg jaring kawat baja/wire mesh Jumlah
1.020 Kg Kawat Wiremesh M6 40,500.00 41,310.00
0.050 Kg Kawat bendrat 33,000.00 1,650.00
0.025 OH Pekerja 150,000.00 3,750.00
0.025 OH Tukang 187,500.00 4,687.50
0.002 OH Kepala Tukang 202,500.00 405.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 42,960.00 9,067.50 52,027.50
AN.04.f 1 m2 bekisting untuk pondasi SNI : 7394:2008
0.040 m3 Kayu Begisting 3,975,000.00 159,000.00
0.300 kg Paku biasa 5cm - 10cm 33,000.00 9,900.00
0.100 liter Minyak begisting 41,250.00 4,125.00
0.520 OH Pekerja 150,000.00 78,000.00
0.260 OH Tukang 187,500.00 48,750.00
0.026 OH Kepala Tukang 202,500.00 5,265.00
0.026 OH Mandor 225,000.00 5,850.00
Jumlah 14,025.00 137,865.00 151,890.00
AN.04.g 1 M² Pasang Bekisting untuk sloof 3x Pakai SNI : 7394:2008
0.016 m3 Kayu Begisting 3,975,000.00 62,606.25
0.105 kg Paku biasa 5cm - 10cm 33,000.00 3,465.00
0.035 liter Minyak begisting 41,250.00 1,443.75
0.182 OH Pekerja 150,000.00 27,300.00
0.091 OH Tukang 187,500.00 17,062.50
0.009 OH Kepala Tukang 202,500.00 1,842.75
0.009 OH Mandor 225,000.00 2,047.50
Jumlah 67,515.00 48,252.75 115,767.75
AN.04.h 1 M² Pasang Bekisting untuk kolom 3x Pakai SNI : 7394:2008
0.014 M³ Kayu begisting 3,975,000.00 55,650.00
0.140 Kg Paku biasa 5cm - 10cm 33,000.00 4,620.00
0.070 Ltr Minyak begisting 41,250.00 2,887.50
0.005 M³ Kayu meranti balok 3,750,000.00 19,687.50
0.123 Lbr Plywood tebal 9 mm 232,500.00 28,481.25
0.700 Btg Dolken kayu galam 46,875.00 32,812.50
0.231 OH Pekerja 150,000.00 34,650.00
0.116 OH Tukang 187,500.00 21,656.25
0.012 OH Kepala Tukang 202,500.00 2,338.88
0.012 OH Mandor 225,000.00 2,598.75
Jumlah 144,138.75 61,243.88 205,382.63
AN.04.i 1 M² Pasang Bekisting untuk balok/Ring Balk 2x Pakai SNI : 7394:2008
0.022 M³ Kayu begisting 3,975,000.00 87,450.00
0.220 Kg Paku biasa 5cm - 10cm 33,000.00 7,260.00
0.110 Ltr Minyak begisting 41,250.00 4,537.50
0.010 M³ Kayu meranti balok 3,750,000.00 37,125.00
0.193 Lbr Plywood tebal 9 mm 232,500.00 44,756.25
1.100 Btg Dolken kayu galam 46,875.00 51,562.50
0.363 OH Pekerja 150,000.00 54,450.00
0.182 OH Tukang 187,500.00 34,031.25
0.018 OH Kepala Tukang 202,500.00 3,675.38
0.018 OH Mandor 225,000.00 4,083.75
Jumlah 232,691.25 96,240.38 328,931.63
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.04.j 1 m2 bekisting untuk plat lantai 2x pakai SNI : 7394:2008


0.022 M³ Kayu begisting 3,975,000.00 87,450.00
0.220 Kg Paku biasa 5cm - 10cm 33,000.00 7,260.00
0.110 Ltr Minyak begisting 41,250.00 4,537.50
0.008 M³ Kayu meranti balok 3,750,000.00 30,937.50
0.193 Lbr Plywood tebal 9 mm 232,500.00 44,756.25
3.300 Btg Dolken kayu galam 46,875.00 154,687.50
0.363 OH Pekerja 150,000.00 54,450.00
0.182 OH Tukang 187,500.00 34,031.25
0.018 OH Kepala Tukang 202,500.00 3,675.38
0.018 OH Mandor 225,000.00 4,083.75
Jumlah 329,628.75 96,240.38 425,869.13
AN.04.k 1 m2 bekisting untuk tangga 2x Pakai SNI : 7394:2008
0.017 M³ Kayu begisting 3,975,000.00 65,587.50
0.220 Kg Paku biasa 5cm - 10cm 33,000.00 7,260.00
0.083 Ltr Minyak begisting 41,250.00 3,403.13
0.008 M³ Kayu meranti balok 3,750,000.00 30,937.50
0.193 Lbr Plywood tebal 9 mm 232,500.00 44,756.25
1.100 Btg Dolken kayu galam 46,875.00 51,562.50
0.363 OH Pekerja 150,000.00 54,450.00
0.182 OH Tukang 187,500.00 34,031.25
0.018 OH Kepala Tukang 202,500.00 3,675.38
0.018 OH Mandor 225,000.00 4,083.75
Jumlah 203,506.88 96,240.38 299,747.25
AN.04.l 1 m3 Beton Cor Camp. 1 : 3 : 5 SNI : 2002
247.000 Kg Semen Portland 2,250.00 555,750.00
0.520 M³ Pasir beton 555,000.00 288,600.00
0.780 M³ Koral 555,000.00 432,900.00
215.000 liter Air 135.00 29,025.00
1.650 OH Pekerja 150,000.00 247,500.00
0.275 OH Tukang 187,500.00 51,562.50
0.028 OH Kepala Tukang 202,500.00 5,670.00
0.083 OH Mandor 225,000.00 18,675.00
Jumlah 1,306,275.00 323,407.50 1,629,682.50
AN.04.m 1 m3 Cor Camp. 1 :2:3 SNI : 2002
371.000 Kg Semen Portland 2,250.00 834,750.00
0.520 M³ Pasir beton 555,000.00 288,600.00
0.780 M³ Koral 555,000.00 432,900.00
215.000 liter Air 135.00 29,025.00
1.650 OH Pekerja 150,000.00 247,500.00
1.000 OH Tukang 187,500.00 187,500.00
0.300 OH Kepala Tukang 202,500.00 60,750.00
0.400 OH Mandor 225,000.00 90,000.00
Jumlah 1,585,275.00 585,750.00 2,171,025.00
AN.04.n 1 m3 Pembongkaran betron bertulang SNI : 2002
13.334 OH Pekerja 150,000.00 2,000,100.00
0.666 OH Mandor 225,000.00 149,850.00
Jumlah 2,149,950.00 2,149,950.00
AN.05 PEKERJAAN DINDING

AN.05.a 1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 2 Ps SNI 6897 : 2008


45.500 Bh Bata Merah 1,800.00 81,900.00
14.138 Kg Semen portland 2,250.00 31,809.38
0.026 M³ Pasir pasang 375,000.00 9,750.00
0.600 OH Pekerja 150,000.00 90,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.030 OH Mandor 225,000.00 6,750.00
Jumlah 123,459.38 138,300.00 261,759.38
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.05.b 1 M² Pasangan Bata Merah tebal ½ bata , 1 Pc : 4 Ps SNI 6897 : 2008


45.500 Bh Bata Merah 1,800.00 81,900.00
8.629 Kg Semen portland 2,250.00 19,414.69
0.030 M³ Pasir pasang 375,000.00 11,334.38
0.600 OH Pekerja 150,000.00 90,000.00
0.200 OH Tukang 187,500.00 37,500.00
0.020 OH Kepala Tukang 202,500.00 4,050.00
0.030 OH Mandor 225,000.00 6,750.00
Jumlah 112,649.06 138,300.00 250,949.06
AN.05.c 1 M² Plesteran 1 Pc : 2 Ps SNI 2837 : 2008
10.224 Kg Semen portland 2,250.00 23,004.00
0.020 M³ Pasir pasang 375,000.00 7,500.00
0.300 OH Pekerja 150,000.00 45,000.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.015 OH Mandor 225,000.00 3,375.00
Jumlah 30,504.00 79,537.50 110,041.50
AN.05.d 1 M² Plesteran 1 Pc : 4 Ps SNI 2837 : 2008
6.240 Kg Semen portland 2,250.00 14,040.00
0.024 M³ Pasir pasang 375,000.00 9,000.00
0.300 OH Pekerja 150,000.00 45,000.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.015 OH Mandor 225,000.00 3,375.00
Jumlah 23,040.00 79,537.50 102,577.50
AN.05.e 1 m2 Acian SNI 2837 : 2008
3.250 kg Semen portland 2,250.00 7,312.50
0.200 OH Pekerja 150,000.00 30,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.010 OH Mandor 225,000.00 2,250.00
Jumlah 37,312.50 23,025.00 60,337.50
AN.06 PEKERJAAN ATAP

AN.06.a 1 M2 Pasang konstruksi kuda-kuda baja Ringan SNI : 03-3436-2002


1.000 M2 Pasang Kuda - Kuda Baja Ringan 375,000.00 375,000.00
Jumlah 375,000.00 375,000.00
AN.06.b 1 M² : Pasang atap genteng metal SNI : 03-3436-2002
1.020 Lbr Genteng metal 142,500.00 145,350.00
0.200 Kg Paku genteng metal 48,000.00 9,600.00
0.200 OH Pekerja 150,000.00 30,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 154,950.00 51,000.00 205,950.00
AN.06.c 1 M' : Pasang nok genteng metal SNI : 03-3436-2002
1.100 Bh Bubungan Genteng Metal 73,500.00 80,850.00
0.050 Kg Paku genteng metal 48,000.00 2,400.00
0.250 OH Pekerja 150,000.00 37,500.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.013 OH Mandor 225,000.00 2,925.00
Jumlah 83,250.00 71,587.50 154,837.50
AN.06.d 1 m' Pasang talang datar/ jurai seng BJLS 25 lebar 90 cm SNI : 7393:2008
1.050 m' seng BJLS 25 lebar 90 cm 61,500.00 64,575.00
0.015 kg Paku 1 cm - 2,5 cm 30,000.00 450.00
0.019 m3 Kayu meranti papan 5,475,000.00
0.200 OH Pekerja 150,000.00 30,000.00
0.400 OH Tukang 187,500.00 75,000.00
0.025 OH Kepala Tukang 202,500.00 5,062.50
0.010 OH Mandor 225,000.00 2,250.00
Jumlah 65,025.00 112,312.50 177,337.50
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.06.e 1 M' Pasang listplank Calsiboard ukuran 2 x.30 - rangkap 20 cm


0.120 M2 Calsi Board 9 mm 281,250.00 33,750.00
0.060 Kg Paku 1 cm - 2,5 cm 30,000.00 1,800.00
0.100 OH Pekerja 150,000.00 15,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.050 OH Mandor 225,000.00 11,250.00
Jumlah 35,550.00 47,025.00 82,575.00
AN.06.f 1 m2 Pasang aluminium foil/ Sisalation
1.050 m2 Sisalation/ aluminium foil 9,000.00 9,450.00
0.150 OH Pekerja 150,000.00 22,500.00
0.050 OH Tukang 187,500.00 9,375.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.008 OH Mandor 225,000.00 1,800.00
Jumlah 9,450.00 12,187.50 21,637.50
AN.06.g 1 M² : Pasang atap Zincalum
1.020 Lbr Atap Zincalume 135,000.00 137,700.00
0.200 Kg Paku genteng metal 48,000.00 9,600.00
0.200 OH Pekerja 150,000.00 30,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 147,300.00 51,000.00 198,300.00
AN.06.h 1 M² : Pasang atap genteng Keramik SNI : 03-3436-2002
13.600 Bh Genteng Keramik 37,500.00 510,000.00
0.200 OH Pekerja 150,000.00 30,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 510,000.00 51,000.00 561,000.00
AN.06.i 1 M' : Pasang nok Genteng keramik SNI : 03-3436-2002
3.800 Bh Bubungan Zincalume 78,750.00 299,250.00
0.250 OH Pekerja 150,000.00 37,500.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.013 OH Mandor 225,000.00 2,925.00
Jumlah 299,250.00 71,587.50 370,837.50
AN.06.j 1 M² : Pasang atap bahan bitumen
0.526 Bh Genteng Bitumen 150,000.00 78,900.00
0.200 OH Pekerja 150,000.00 30,000.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.001 OH Mandor 225,000.00 225.00
Jumlah 78,900.00 51,000.00 129,900.00
AN.06.k 1 M : Pasang nok bahan bitumen
1.000 Lbr Nok Genteng Bitumen 97,500.00 97,500.00
0.250 OH Pekerja 150,000.00 37,500.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.013 OH Mandor 225,000.00 2,925.00
Jumlah 97,500.00 71,587.50 169,087.50
AN.07 PEKERJAAN PLAFOND

AN.07.a 1 M² Pasang langit-langit calsiboard


0.350 Lbr Calsi Board 4 mm 131250.00 45,937.50
0.010 Dos Paku Calsi Board 18,000.00 180.00
0.100 Pack Kompon 45,000.00 4,500.00
0.028 Roll Fiber Tape 60,000.00 1,680.00
0.100 Oh Pekerja 150,000.00 15,000.00
0.050 Oh Mandor 225,000.00 11,250.00
0.005 Oh Tukang 187,500.00 937.50
0.005 Oh Kepala Tukang 202,500.00 1,012.50

Jumlah 52,297.50 28,200.00 80,497.50


ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.07.b 1 m2 Memasang Plafondn gypsum board, uk. (120 x 240 x 0.9)cm SNI : 2839:2008
0.364 lbr Gypsum board 120,000.00
43,680.00
0.110 kg Paku Gypsum 48,000.005,280.00
0.100 Pack Kompon 45,000.004,500.00
0.028 Roll Fiber Tape 60,000.001,680.00
0.100 OH Pekerja 150,000.00 15,000.00
0.050 OH Tukang 187,500.00 9,375.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 55,140.00 26,512.50 81,652.50
AN.07.c 1 m1 Memasang list gypsum profil SNI : 2839:2008
1.050 m' List Plafond Gypsum 50,250.00 52,762.50
0.150 kg Tepung Gypsum 6,750.00 1,012.50
0.060 OH Pekerja 150,000.00 9,000.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.003 OH Mandor 225,000.00 675.00
Jumlah 53,775.00 22,140.00 75,915.00
AN.07.d 1 M2 Pasang Rangka Plafond Metal furring SNI : 2839:2008
1.000 m' Rangka Plafond Metal Furring 165,000.00 165,000.00
Jumlah 165,000.00 - 165,000.00
AN.08 PEKERJAAN PENUTUP LANTAI & DINDING

AN.08.a 1 M² : Pasang Lantai Keramik 40 x 40 cm


6.250 Bh Keramik lantai 40/40 12,000.00 75,000.00
14.150 Kg Semen portland 2,250.00 31,837.50
0.039 M³ Pasir pasang 375,000.00 14,625.00
2.000 Kg Semen warna 3,300.00 6,600.00
0.620 OH Pekerja 150,000.00 93,000.00
0.350 OH Tukang 187,500.00 65,625.00
0.035 OH Kepala Tukang 202,500.00 7,087.50
0.030 OH Mandor 225,000.00 6,750.00
Jumlah 128,062.50 172,462.50 300,525.00
AN.08.b 1 M² : Pasang Lantai Keramik 20 x 20 cm SNI : 7395:2008
26.500 bh Keramik lantai 20/20 5,400.00 143,100.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 177,177.00 117,112.50 294,289.50
AN.08.c 1 M² : Pasang Keramik Dinding 20 x 40 cm
12.500 Bh Keramik dinding 20/40 6,750.00 84,375.00
9.300 Kg Semen portland 2,250.00 20,925.00
0.018 M³ Pasir pasang 375,000.00 6,750.00
1.552 Kg Semen warna 3,300.00 5,121.60
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 117,171.60 117,112.50 234,284.10
AN.08.d 1 M' : Pasang Plint Keramik artistik
5.000 Bh Plint keramik artistik 11,250.00 56,250.00
1.650 Kg Semen portland 2,250.00 3,712.50
0.003 M³ Pasir pasang 375,000.00 1,200.00
0.100 Kg Semen warna 3,300.00 330.00
0.900 OH Pekerja 150,000.00 135,000.00
0.090 OH Tukang 187,500.00 16,875.00
0.009 OH Kepala Tukang 202,500.00 1,822.50
0.005 OH Mandor 225,000.00 1,012.50
Jumlah 61,492.50 154,710.00 216,202.50
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.08.e 1 M' : Pasang Plint Keramik lantai


2.500 Bh Plint keramik lantai 9,000.00 22,500.00
1.650 Kg Semen portland 2,250.00 3,712.50
0.003 M³ Pasir pasang 375,000.00 1,200.00
0.100 Kg Semen warna 3,300.00 330.00
0.900 OH Pekerja 150,000.00 135,000.00
0.090 OH Tukang 187,500.00 16,875.00
0.009 OH Kepala Tukang 202,500.00 1,822.50
0.005 OH Mandor 225,000.00 1,012.50
Jumlah 27,742.50 154,710.00 182,452.50
AN.08.f 1 M2 : Pasang Dinding Batu tempel/Alam
1.100 M2 Batu tempel/Alam 270,000.00 297,000.00
11.750 Kg Semen portland 2,250.00 26,437.50
0.003 M³ Pasir pasang 375,000.00 1,200.00
0.700 OH Pekerja 150,000.00 105,000.00
0.350 OH Tukang 187,500.00 65,625.00
0.035 OH Kepala Tukang 202,500.00 7,087.50
0.035 OH Mandor 225,000.00 7,875.00
Jumlah 324,637.50 185,587.50 510,225.00
AN.08.g 1 M2 : Pasang Step nosing lantai Tangga
50.000 Bh Step Nosing 15,450.00 772,500.00
1.650 Kg Semen portland 2,250.00 3,712.50
0.003 M³ Pasir pasang 375,000.00 1,200.00
0.100 Kg Semen warna 3,300.00 330.00
0.900 OH Pekerja 150,000.00 135,000.00
0.090 OH Tukang 187,500.00 16,875.00
0.009 OH Kepala Tukang 202,500.00 1,822.50
0.005 OH Mandor 225,000.00 1,012.50
Jumlah 777,742.50 154,710.00 932,452.50
AN.08.h 1 M' : List Keramik dinding km/wc 6x20
5.000 Bh Keramik list dinding 6x20 3,750.00 18,750.00
0.330 Kg Semen portland 2,250.00 742.50
0.001 M³ Pasir pasang 375,000.00 240.00
0.020 Kg Semen warna 3,300.00 66.00
0.180 OH Pekerja 150,000.00 27,000.00
0.018 OH Tukang 187,500.00 3,375.00
0.002 OH Kepala Tukang 202,500.00 364.50
0.001 OH Mandor 225,000.00 202.50
Jumlah 19,798.50 30,942.00 50,740.50
AN.08.i 1 M² : Pasang Lantai Granit 60 x 60 cm
2.778 Bh Granit Lantai 60/60 375,000.00 1,041,666.67
14.150 Kg Semen portland 2,250.00 31,837.50
0.039 M³ Pasir pasang 375,000.00 14,625.00
2.000 Kg Semen warna 3,300.00 6,600.00
0.620 OH Pekerja 150,000.00 93,000.00
0.350 OH Tukang 187,500.00 65,625.00
0.035 OH Kepala Tukang 202,500.00 7,087.50
0.030 OH Mandor 225,000.00 6,750.00
Jumlah 1,094,729.17 172,462.50 1,267,191.67
AN.08.j 1 M2 PASANGAN Batu Sikat
1.000 m2 Pas Batu Sikat 570,000.00 570,000.00
Jumlah 570,000.00 - 570,000.00
AN.08.k 1 M² : Pasang Lantai Homogenius uk. 60/60
2.778 bh Keramik Homogenius 60/60 124,500.00 345,833.33
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 379,910.33 117,112.50 497,022.83
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.08.l 1 M² : Pasang Lantai Homogenius uk. 80/80


1.563 bh Keramik Homogenius 80/80 150,000.00 234,375.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 268,452.00 117,112.50 385,564.50
AN.08.m 1 M² : Pasang Lantai Homogenius uk. 100/100
1.000 bh Keramik Homogenius 100/100 168,750.00 168,750.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 202,827.00 117,112.50 319,939.50
AN.08.n 1 M² : Pasangan Paving Block Segi Enam
36.500 bh Paving Block 6,000.00 219,000.00
0.178 m3 Pasir Urug 285,000.00 50,730.00
0.250 OH Pekerja 150,000.00 37,500.00
0.125 OH Tukang 187,500.00 23,437.50
0.013 OH Kepala Tukang 202,500.00 2,632.50
0.013 OH Mandor 225,000.00 2,925.00
Jumlah 269,730.00 66,495.00 336,225.00
AN.08.o 1 M² : Pasang Lantai Homogenius uk. 100/100
1.000 bh Keramik Homogenius 100/100 168,750.00 168,750.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 202,827.00 117,112.50 319,939.50
AN.08.p 1 M² : Pasang Dinding Keramik Border 20 x 20 cm SNI : 7395:2008
26.500 bh Dinding Keramik Border 20/20 4,200.00 111,300.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 145,377.00 117,112.50 262,489.50
AN.08.q 1 M² : Pasang Dinding Keramik Border 30 x 30 SNI : 7395:2008
11.000 bh Keramik lantai 30/30 7,250.00 79,750.00
9.300 kg Semen portland 2,250.00 20,925.00
0.018 m3 Pasir pasang 375,000.00 6,750.00
1.940 kg Semen warna 3,300.00 6,402.00
0.090 OH Pekerja 150,000.00 13,500.00
0.450 OH Tukang 187,500.00 84,375.00
0.045 OH Kepala Tukang 202,500.00 9,112.50
0.045 OH Mandor 225,000.00 10,125.00
Jumlah 113,827.00 117,112.50 230,939.50
AN.09 PEKERJAAN SANITAIR

AN.09.a Memasang 1 m' pipa PVC type AW Ø ½" SNI : 2002


1.200 M' Pipa PVC Ø 1/2" 15,000.00 18,000.00
Perlengkapan (35% Harga pipa) 5,250.00 -
0.036 OH Pekerja 150,000.00 5,400.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 18,000.00 18,270.00 36,270.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.09.b Memasang 1 m' pipa PVC type AW Ø 3/4" SNI : 2002


1.200 M' Pipa PVC Ø 3/4" 19,500.00 23,400.00
Perlengkapan (35% Harga pipa) 6,825.00 6,825.00
0.030 OH Pekerja 150,000.00 4,500.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 30,225.00 17,370.00 47,595.00
AN.09.c Memasang 1 m' pipa PVC type AW Ø 4" SNI : 2002
1.200 M' Pipa PVC Ø 4" 86,625.00 103,950.00
Perlengkapan (35% Harga pipa) 30,318.75 30,318.75
0.036 OH Pekerja 150,000.00 5,400.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 134,268.75 18,270.00 152,538.75
AN.09.d Memasang 1 m' pipa PVC type AW Ø 3" SNI : 2002
1.200 M' Pipa PVC Ø 3" 110,812.50 132,975.00
Perlengkapan (35% Harga pipa) 38,784.38 38,784.38
0.036 OH Pekerja 150,000.00 5,400.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 171,759.38 18,270.00 190,029.38
AN.09.d' Memasang 1 m' pipa PVC type AW Ø 6" SNI : 2002
1.200 M' Pipa PVC Ø 6" 210,000.00 252,000.00
Perlengkapan (35% Harga pipa) 73,500.00 73,500.00
0.036 OH Pekerja 150,000.00 5,400.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 325,500.00 18,270.00 343,770.00
AN.09.e Memasang 1 buah kran Ø 3/4" - ½" SNI : 2002
1.000 Bh Kran 1/2" 37,500.00 37,500.00
0.250 Bh Seal tape 4,350.00 1,087.50
0.010 OH Pekerja 150,000.00 1,500.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 38,587.50 23,400.00 61,987.50
AN.09.f Memasang 1 unit Pasang floordrain SNI : 2002
1.000 Bh Floor drain 37,500.00 37,500.00
0.010 OH Pekerja 150,000.00 1,500.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 37,500.00 23,400.00 60,900.00
AN.09.g Memasang 1 unit Pasang Kran Shower SNI : 2002
1.000 Bh Kran Shower 225,000.00 225,000.00
0.010 OH Pekerja 150,000.00 1,500.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 225,000.00 23,400.00 248,400.00
AN.09.h Memasang 1 unit Pasang Jet Washer SNI : 2002
1.000 Bh Jet washer 150,000.00 150,000.00
0.010 OH Pekerja 150,000.00 1,500.00
0.100 OH Tukang 187,500.00 18,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 150,000.00 23,400.00 173,400.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.09.i Memasang 1 buah Closet jongkok SNI : 2002


1.000 Bh Closet Jongkok 304,920.00 304,920.00
6.000 Kg Semen portland 2,250.00 13,500.00
0.010 M³ Pasir pasang 375,000.00 3,750.00
1.000 OH Pekerja 150,000.00 150,000.00
0.500 OH Tukang 187,500.00 93,750.00
0.500 OH Kepala Tukang 202,500.00 101,250.00
0.160 OH Mandor 225,000.00 36,000.00
Jumlah 322,170.00 381,000.00 703,170.00
AN.09.j Memasang 1 buah Closet duduk SNI : 2002
1.000 Bh Kloset duduk 4,687,500.00 4,687,500.00
Perlengkapan (6% Harga closet) 281,250.00
3.300 OH Pekerja 150,000.00 495,000.00
1.100 OH Tukang batu 187,500.00 206,250.00
0.001 OH Kepala Tukang 202,500.00 202.50
0.160 OH Mandor 225,000.00 36,000.00
Jumlah 4,968,750.00 737,452.50 5,706,202.50
AN.09.k Memasang 1 buah Urinoir SNI : 2002
1.000 Bh Urinoir 2,945,250.00 2,945,250.00
Perlengkapan (30% Harga Urinoir) 883,575.00
6.000 kg Semen portland 2,250.00 13,500.00
0.010 m3 Pasir pasang 375,000.00 3,750.00
1.000 OH Pekerja 150,000.00 150,000.00
1.000 OH Tukang batu 187,500.00 187,500.00
0.100 OH Kepala Tukang 202,500.00 20,250.00
0.100 OH Mandor 225,000.00 22,500.00
Jumlah 3,846,075.00 380,250.00 4,226,325.00
AN.09.l Memasang 1 buah Wastafel SNI : 2002
1.000 Bh Urinoir Wastafel 1,472,625.00 1,472,625.00
Perlengkapan (12% Harga wastafel) 176,715.00
6.000 kg Semen portland 2,250.00 13,500.00
0.010 m3 Pasir pasang 375,000.00 3,750.00
1.200 OH Pekerja 150,000.00 180,000.00
0.750 OH Tukang batu 187,500.00 140,625.00
0.070 OH Kepala Tukang 202,500.00 14,175.00
0.110 OH Mandor 225,000.00 24,750.00
Jumlah 1,666,590.00 359,550.00 2,026,140.00
AN.09.m 1 buah bak mandi batu bata vol. 0,3 m3 SNI : 2002
45.000 bh bata merah 1,800.00 81,000.00
20.779 kg Semen portland 2,250.00 46,753.25
0.052 m3 Pasir pasang 375,000.00 19,480.52
84.000 bh Keramik lantai 20/20 5,400.00 453,600.00
1.039 kg Semen warna 3,300.00 3,428.57
1.500 OH Pekerja 150,000.00 225,000.00
0.750 OH Tukang 187,500.00 140,625.00
0.075 OH Kepala Tukang 202,500.00 15,187.50
0.075 OH Mandor 225,000.00 16,875.00
Jumlah 604,262.34 397,687.50 1,001,949.84
AN.09.n Memasang 1 m' pipa PVC type AW Ø 2" SNI : 2002
1.200 M' Pipa PVC Ø 2" 32,812.50 39,375.00
Perlengkapan (35% Harga pipa) 11,484.38 11,484.38
0.036 OH Pekerja 150,000.00 5,400.00
0.060 OH Tukang 187,500.00 11,250.00
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.002 OH Mandor 225,000.00 405.00
Jumlah 50,859.38 18,270.00 69,129.38
AN.11 PEKERJAAN BESI & ALUMINIUM
AN.11.e 1 m2 Pasang pintu rolling door besi SNI : 7393:2008
1.000 m2 Pintu Rolling Door besi 433,125.00 433,125.00
1.200 OH Pekerja 150,000.00 180,000.00
1.200 OH Tukang besi konstruksi 187,500.00 225,000.00
0.120 OH Kepala Tukang 202,500.00 24,300.00
0.006 OH Mandor 225,000.00 1,350.00
Jumlah 433,125.00 430,650.00 863,775.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.11.f 1 m2 Pasang pintu lipat (folding gate) SNI : 7393:2008


1.000 m2 Pintu lipat 2,165,625.00 2,165,625.00
0.440 OH Pekerja 150,000.00 66,000.00
0.440 OH Tukang 187,500.00 82,500.00
0.044 OH Kepala Tukang 202,500.00 8,910.00
0.022 OH Mandor 225,000.00 4,950.00
Jumlah 2,165,625.00 162,360.00 2,327,985.00
AN.11.g 1 m2 Pasang rolling door aluminium SNI : 7393:2008
1.000 m2 Rolling door aluminium 300,000.00 300,000.00
1.000 OH Pekerja 150,000.00 150,000.00
1.000 OH Tukang 187,500.00 187,500.00
0.100 OH Kepala Tukang 202,500.00 20,250.00
0.050 OH Mandor 225,000.00 11,250.00
Jumlah 300,000.00 369,000.00 669,000.00
AN.11.h 1 m' Pasang kusen pintu/jendela aluminium
1.100 m' Profil aluminium 92,250.00 101,475.00
2.000 buah Skrup fixer 1,200.00 2,400.00
0.060 tube Sealant 9,000.00 540.00
0.043 OH Pekerja 150,000.00 6,450.00
0.043 OH Tukang khusus aluminium 187,500.00 8,062.50
0.004 OH Kepala Tukang 202,500.00 870.75
0.002 OH Mandor 225,000.00 472.50
Jumlah 104,415.00 15,855.75 120,270.75
AN.11.i 1 Kusen Jendela J1
10.620 m' Profil aluminium 92,250.00 979,695.00
1.740 m' Profil aluminium Daun Jendela 67,500.00 117,450.00
1.184 m2 Kaca bening tebal 5mm 187,500.00 222,075.00
1.000 bh Rambuncis 52,500.00 52,500.00
2.000 bh Engsel Jendela Casement 214,500.00 429,000.00
Acesories ( 6 % harga bahan ) 36,855.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun jendela (20 % bahan) 13,500.00
Jumlah 1,800,720.00 68,805.00 1,869,525.00
AN.11.j 1 Kusen Jendela J2
10.620 m' Profil aluminium 92,250.00 979,695.00
5.380 m' Profil aluminium Daun Jendela 67,500.00 363,150.00
1.523 m2 Kaca bening tebal 5mm 187,500.00 285,637.50
1.000 bh Rambuncis 52,500.00 52,500.00
2.000 bh Engsel Jendela Casement 214,500.00 429,000.00
Acesories ( 6 % harga bahan ) 36,855.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun jendela (20 % bahan) 13,500.00
Jumlah 2,109,982.50 68,805.00 2,178,787.50
AN.11.k 1 Kusen Jendela J3
6.820 m' Profil aluminium 92,250.00 629,145.00
0.740 m2 Kaca bening tebal 5mm 187,500.00 138,750.00
Acesories ( 6 % harga bahan ) 16,785.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Jumlah 767,895.00 35,235.00 803,130.00
AN.11.l 1 Kusen Jendela J4
10.680 m' Profil aluminium 92,250.00 985,230.00
3.480 m' Profil aluminium Daun Jendela 67,500.00 234,900.00
1.173 m2 Kaca bening tebal 5mm 187,500.00 219,870.00
1.000 bh Rambuncis 52,500.00 52,500.00
2.000 bh Engsel Jendela Casement 214,500.00 429,000.00
Acesories ( 6 % harga bahan ) 36,855.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun jendela (20 % bahan) 13,500.00
Jumlah 1,921,500.00 68,805.00 1,990,305.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.11.m 1 Unit Pintu P1


7.200 m' Profil aluminium 92,250.00 664,200.00
1.640 M2 Daun pintu uk 100 cm 1,525,000.00 2,501,000.00
3.000 bh Engsel pintu 4" 75,000.00 225,000.00
1.000 bh Kunci pintu 2 slag 225,000.00 225,000.00
1.000 bh Kunci Silinder 354,000.00 354,000.00
1.000 bh Hendel Pintu 300,000.00 300,000.00
Acesories ( 6 % harga bahan ) 154,275.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun pintu (20 % bahan) 305,000.00
Jumlah 4,269,200.00 477,725.00 4,746,925.00
AN.11.n 1 Unit Pintu P2
1.000 unit Pintu km/wc PVC 1,125,000.00 1,125,000.00
Upah pembuatan profil ( 20 % bahan ) 225,000.00
Jumlah 1,125,000.00 225,000.00 1,350,000.00
AN.11.o 1 Unit Pintu P3
9.750 m' Profil aluminium 92,250.00 899,437.50
1.680 M2 Daun pintu uk 100 cm 1,525,000.00 2,562,000.00
0.950 M2 Kaca bening tebal 5mm 187,500.00
3.000 bh Engsel pintu 4" 75,000.00 225,000.00
1.000 bh Kunci pintu 2 slag 225,000.00 225,000.00
1.000 bh Kunci Silinder 354,000.00 354,000.00
1.000 bh Hendel Pintu 300,000.00 300,000.00
Acesories ( 6 % harga bahan ) 154,275.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun pintu (20 % bahan) 305,000.00
Jumlah 4,565,437.50 477,725.00 5,043,162.50
AN.11.p 1 Kusen Jendela J5
8.550 m' Profil aluminium 92,250.00 788,737.50
3.480 m' Profil aluminium Daun Jendela 67,500.00 234,900.00
1.694 m2 Kaca bening tebal 5mm 187,500.00 317,643.75
1.000 bh Rambuncis 52,500.00 52,500.00
2.000 bh Engsel Jendela Casement 214,500.00 429,000.00
Acesories ( 6 % harga bahan ) 36,855.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun jendela (20 % bahan) 13,500.00
Jumlah 1,822,781.25 68,805.00 1,891,586.25
AN.11.q 1 Kusen Jendela J6
5.650 m' Profil aluminium 92,250.00 521,212.50
3.480 m' Profil aluminium Daun Jendela 67,500.00 234,900.00
0.622 m2 Kaca bening tebal 5mm 187,500.00 116,550.00
1.000 bh Rambuncis 52,500.00 52,500.00
2.000 bh Engsel Jendela Casement 214,500.00 429,000.00
Acesories ( 6 % harga bahan ) 36,855.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun jendela (20 % bahan) 13,500.00
Jumlah 1,354,162.50 68,805.00 1,422,967.50
AN.11.r 1 Kusen Jendela J7
5.400 m' Profil aluminium 92,250.00 498,150.00
0.870 m2 Kaca bening tebal 5mm 187,500.00 163,125.00
Acesories ( 6 % harga bahan ) 16,785.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Jumlah 661,275.00 35,235.00 696,510.00
AN.11.s Kusen BV1
2.400 m' Profil aluminium 92,250.00 221,400.00
0.240 m2 Kaca Buram tebal 5mm 225,000.00 54,000.00
Acesories ( 6 % harga bahan ) 19,035.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Jumlah 275,400.00 37,485.00 312,885.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.11.t 1 Unit Pintu P4


6.300 m' Profil aluminium 92,250.00 581,175.00
4.200 M2 Daun pintu uk 100 cm 1,525,000.00 6,405,000.00
6.000 bh Engsel pintu 4" 75,000.00 450,000.00
2.000 bh Kunci pintu 2 slag 225,000.00 450,000.00
2.000 bh Kunci Silinder 354,000.00 708,000.00
2.000 bh Hendel Pintu 300,000.00 600,000.00
Acesories ( 6 % harga bahan ) 154,275.00
Upah pembuatan profil ( 20 % bahan ) 18,450.00
Upah pembuatan daun pintu (20 % bahan) 305,000.00
Jumlah 9,194,175.00 477,725.00 9,671,900.00
AN.12 PEKERJAAN KAYU, PENGGANTUNG & PENGUNCI
AN.12.a Pasang 1 buah kunci tanam SNI : 2008
1.000 bh Kunci Pintu 2 Slag 225,000.00 225,000.00
0.010 OH Pekerja 150,000.00 1,500.00
0.500 OH Tukang 187,500.00 93,750.00
0.010 OH Kepala Tukang 202,500.00 2,025.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 225,000.00 98,400.00 323,400.00
AN.12.b 1 buah Pasang engsel pintu SNI : 2008
1.000 bh Engsel pintu 4" 75,000.00 75,000.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 75,000.00 33,581.25 108,581.25
AN.12.c 1 buah Pasang engsel jendela SNI : 2008
1.000 bh Grendel jendela 30,000.00 30,000.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 112.50
Jumlah 30,000.00 33,525.00 63,525.00
AN.12.d 1 buah Pasang Grendel jendela
1.000 bh Grendel jendela 30,000.00 30,000.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 112.50
Jumlah 30,000.00 33,525.00 63,525.00
AN.12.e 1 buah Pasang grendel pintu
1.000 bh Grendel Pintu 39,000.00 39,000.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 112.50
Jumlah 39,000.00 33,525.00 72,525.00
AN.12.f 1 buah Pasang hak angin
1.000 bh Hak angin 47,640.00 47,640.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 47,640.00 33,581.25 81,221.25
AN.12.g 1 buah Pasang kunci tanam Cilinder
1.000 bh Kunci Silinder 354,000.00 354,000.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 354,000.00 33,581.25 387,581.25
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.12.h 1 buah Pasang kunci (km/wc)


1.000 bh Kunci Kamar Mandi 260,250.00 260,250.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 260,250.00 33,581.25 293,831.25
AN.12.i 1 buah Pasang Expanyolet
1.000 Bh Expanyolet 300,000.00 300,000.00
0.100 OH Pekerja 150,000.00 15,000.00
1.000 OH Tukang 187,500.00 187,500.00
0.100 OH Kepala Tukang 202,500.00 20,250.00
0.005 OH Mandor 225,000.00 1,125.00
Jumlah 300,000.00 223,875.00 523,875.00
AN.12.j 1 buah Pasang Hendel Pintu
1.000 Bh Hendel Pintu 300,000.00 300,000.00
0.050 OH Pekerja 150,000.00 7,500.00
0.500 OH Tukang 187,500.00 93,750.00
0.050 OH Kepala Tukang 202,500.00 10,125.00
0.003 OH Mandor 225,000.00 562.50
Jumlah 300,000.00 111,937.50 411,937.50
AN.12.k 1 M3 Pek kusen pintu/jendela kayu Bengkirai
1.200 M3 Kayu bengkirai balok 8,175,000.00 9,810,000.00
1.000 kg Lem kayu 18,000.00 18,000.00
1.250 kg Paku Ulin 42,000.00 52,500.00
21.000 OH Tukang 187,500.00 3,937,500.00
2.200 OH Kepala tukang 202,500.00 445,500.00
7.000 OH Pekerja 150,000.00 1,050,000.00
0.350 OH Mandor 225,000.00 78,750.00
Jumlah 9,880,500.00 5,511,750.00 15,392,250.00
AN.12.l 1 M3 Pek kusen pintu/jendela kayu Ulin
1.200 M3 Kayu ulin balok 7,260,000.00 8,712,000.00
1.000 kg Lem kayu 18,000.00 18,000.00
1.250 kg Paku Ulin 42,000.00 52,500.00
21.000 OH Tukang 187,500.00 3,937,500.00
2.200 OH Kepala tukang 202,500.00 445,500.00
7.000 OH Pekerja 150,000.00 1,050,000.00
0.350 OH Mandor 225,000.00 78,750.00
Jumlah 8,782,500.00 5,511,750.00 14,294,250.00
AN.12.m 1 Unit P1 (type 120)
0.041 M3 Kusen Kayu (AN.12.k) 15,392,250.00 631,697.94
1.000 unit daun Pintu 1,425,000.00 1,425,000.00
8.000 bh Engsel Pintu (AN.12.b) 108,581.25 868,650.00
2.000 bh Hendel Pintu (AN.12.j) 411,937.50 823,875.00
4.000 bh Engsel Jendela (AN.12.c) 63,525.00 254,100.00
4.000 bh Grendel Jendela (AN.12.d) 63,525.00 254,100.00
2.000 Bh Espanyolet (AN.12.i) 523,875.00 1,047,750.00
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
7.372 M2 Cat Kayu (AN.13.a) 57,880.20 426,692.83
Jumlah - - 6,119,447.02
AN.12.n 1 Unit P1 (type 70)
0.035 M3 Kusen Kayu (AN.12.k) 15,392,250.00 543,038.58
1.000 unit daun Pintu 1,425,000.00 1,425,000.00
4.000 bh Engsel Pintu (AN.12.b) 108,581.25 434,325.00
1.000 Set Hendel Pintu (AN.12.j) 411,937.50 411,937.50
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
4.712 M2 Cat Kayu (AN.13.a) 57,880.20 272,731.50
Jumlah - - 3,474,613.83
AN.12.o 1 Unit P2
0.035 M3 Kusen Kayu (AN.12.l) 14,294,250.00 499,155.21
1.000 unit Daun Pintu wc ulin 1,050,000.00 1,050,000.00
4.000 bh Engsel Pintu (AN.12.b) 108,581.25 434,325.00
1.000 Bh Kunci kamar mandi 260,250.00 260,250.00
3.816 M2 Cat Kayu (AN.13.a) 57,880.20 220,870.84
Jumlah - - 2,464,601.05
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.12.p 1 Unit PJ 1 (Type 70)


0.091 M3 Kusen Kayu (AN.12.k) 15,392,250.00 1,401,802.99
2.000 unit daun Pintu PJ 1,200,000.00 2,400,000.00
0.530 M2 Kaca (AN.12.v) 239,831.25 127,206.50
8.000 bh Engsel Pintu (AN.12.b) 108,581.25 868,650.00
2.000 Bh Espanyolet (AN.12.i) 523,875.00 1,047,750.00
1.000 Set Hendel Pintu (AN.12.j) 411,937.50 411,937.50
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
8.094 M2 Cat Kayu (AN.13.a) 57,880.20 468,505.49
Jumlah - - 7,113,433.73
AN.12.q 1 Unit PJ(Type 120)
0.155 M3 Kusen Kayu (AN.12.k) 15,392,250.00 2,380,257.54
2.000 unit daun Pintu PJ 1,200,000.00 2,400,000.00
2.059 M2 Kaca (AN.12.v) 239,831.25 493,860.51
8.000 bh Engsel Pintu (AN.12.b) 108,581.25 868,650.00
12.000 bh Engsel Jendela (AN.12.c) 63,525.00 762,300.00
12.000 bh Grendel Jendela (AN.12.d) 63,525.00 762,300.00
2.000 Bh Espanyolet (AN.12.i) 523,875.00 1,047,750.00
1.000 Set Hendel Pintu (AN.12.j) 411,937.50 411,937.50
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
8.518 M2 Cat Kayu (AN.13.a) 57,880.20 493,046.70
Jumlah - - 10,007,683.50
AN.12.r 1 Unit PJ 2 (Type 70)
0.048 M3 Kusen Kayu (AN.12.k) 15,392,250.00 739,320.55
1.000 unit daun Pintu PJ 1,200,000.00 1,200,000.00
0.677 M2 Kaca (AN.12.v) 239,831.25 162,389.74
4.000 bh Engsel Pintu (AN.12.b) 108,581.25 434,325.00
1.000 Set Hendel Pintu (AN.12.j) 411,937.50 411,937.50
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
8.714 M2 Cat Kayu (AN.13.a) 57,880.20 504,344.91
Jumlah - - 3,839,898.95
AN.12.s 1 Unit J1 (Type 70)
0.054 M3 Kusen Kayu (AN.12.k) 15,392,250.00 832,782.29
0.677 M2 Kaca (AN.12.v) 239,831.25 162,389.74
2.000 bh Engsel Jendela (AN.12.c) 63,525.00 127,050.00
2.000 bh Grendel Jendela (AN.12.d) 63,525.00 127,050.00
2.221 M2 Cat Kayu (AN.13.a) 57,880.20 128,540.35
Jumlah - - 1,377,812.38
AN.12.t 1 Unit J2 (Type 70)
0.048 M3 Kusen Kayu (AN.12.k) 15,392,250.00 739,320.55
0.924 M2 Kaca (AN.12.v) 239,831.25 221,604.08
2.000 bh Engsel Jendela (AN.12.c) 63,525.00 127,050.00
2.000 bh Grendel Jendela (AN.12.d) 63,525.00 127,050.00
1.918 M2 Cat Kayu (AN.13.a) 57,880.20 111,037.38
Jumlah - - 1,326,062.00
AN.12.u 1 Unit J3 (Type 70)
0.083 M3 Kusen Kayu (AN.12.k) 15,392,250.00 1,283,344.24
2.340 M2 Kaca (AN.12.v) 239,831.25 561,205.13
1.918 M2 Cat Kayu (AN.13.a) 57,880.20 111,037.38
Jumlah - - 1,955,586.74
AN.12.v 1 m2 Pasang kaca bening 5 mm
1.100 bh Kaca bening tebal 5mm 187,500.00 206,250.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 206,250.00 33,581.25 239,831.25
AN.12.w 1 m2 Pasang Dinding Roster
25.000 bh Roster 67,500.00 1,687,500.00
11.000 Kg Semen portland 2,250.00 24,750.00
0.035 M3 Pasir pasang 375,000.00 13,125.00
0.015 OH Pekerja 150,000.00 2,250.00
0.150 OH Tukang 187,500.00 28,125.00
0.015 OH Kepala Tukang 202,500.00 3,037.50
0.001 OH Mandor 225,000.00 168.75
Jumlah 1,725,375.00 33,581.25 1,758,956.25
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.12.x 1 Unit BV.1 (Type 70)


0.007 M3 Kusen Kayu (AN.12.k) 15,392,250.00 101,958.26
0.221 M2 Cat Kayu (AN.13.a) 57,880.20 12,779.95
Jumlah 101,958.26 12,779.95 114,738.21
AN.12.y 1 Unit BV.2 (Type 70)
0.014 M3 Kusen Kayu (AN.12.k) 15,392,250.00 221,648.40
0.480 M2 Cat Kayu (AN.13.a) 57,880.20 27,782.50
0.408 M2 Kaca Buram tebal 5mm 225,000.00 91,800.00
Jumlah 221,648.40 27,782.50 249,430.90
AN.12.z 1 Unit P3 (type 120)
0.050 M3 Kusen Kayu (AN.12.k) 15,392,250.00 774,538.02
1.000 M2 daun Pintu 1,425,000.00 1,425,000.00
1.000 Bh kunci tanam Cilinder (AN.12.g) 387,581.25 387,581.25
6.400 M2 Cat Kayu (AN.13.a) 57,880.20 370,433.28
Jumlah - - 2,957,552.55
AN.12.aa 1 Unit J1 (Type 120)
0.063 M3 Kusen Kayu (AN.12.k) 15,392,250.00 969,219.20
0.815 M2 Kaca (AN.12.v) 239,831.25 195,462.47
4.000 bh Engsel Jendela (AN.12.c) 63,525.00 254,100.00
4.000 bh Grendel Jendela (AN.12.d) 63,525.00 254,100.00
2.644 M2 Cat Kayu (AN.13.a) 57,880.20 153,035.25
Jumlah - - 1,825,916.92
AN.12.ab 1 Unit J2 (Type 120)
0.048 M3 Kusen Kayu (AN.12.k) 15,392,250.00 733,902.48
0.560 M2 Kaca (AN.12.v) 239,831.25 134,305.50
4.000 bh Engsel Jendela (AN.12.c) 63,525.00 254,100.00
4.000 bh Grendel Jendela (AN.12.d) 63,525.00 254,100.00
2.039 M2 Cat Kayu (AN.13.a) 57,880.20 118,029.30
Jumlah - - 1,494,437.28
AN.12.ac 1 Unit J3 (Type 120)
0.115 M3 Kusen Kayu (AN.12.k) 15,392,250.00 1,772,694.65
1.630 M2 Kaca (AN.12.p) 239,831.25 390,924.94
8.000 bh Engsel Jendela (AN.12.c) 63,525.00 508,200.00
8.000 bh Grendel Jendela (AN.12.d) 63,525.00 508,200.00
3.752 M2 Cat Kayu (AN.13.a) 57,880.20 217,166.51
Jumlah - - 3,397,186.10
AN.12.ad 1 Unit Pintu Garasi (Type 120)
0.068 M3 Kusen Kayu (AN.12.k) 15,392,250.00 1,041,747.48
1.000 bh Rel Bawah (pintu Garasi) 570,000.00 570,000.00
1.000 bh Rel Atas (Pintu Garasi) 675,000.00 675,000.00
4.000 bh Engsel Atas Tengah (pintu Garasi) 292,500.00 1,170,000.00
2.000 bh Engsel Atas Pinggir (pintu Garasi ) 270,000.00 540,000.00
4.000 bh Engsel Bawah Tengah (pintu Garasi) 195,000.00 780,000.00
2.000 bh Engsel Bawah Pinggir (pintu Garasi ) 150,000.00 300,000.00
6.000 bh Pintu Garasi 1,350,000.00 8,100,000.00
2.256 M2 Cat Kayu (AN.13.a) 57,880.20 130,577.73
Jumlah - - 13,307,325.21
AN.13 PEKERJAAN PENGECATAN
AN.13.a 1 M² : pengecatan bidang kayu baru,
(1 lapis cat dasar , 2 lapis cat penutup).
0.200 kg Cat meni 37,500.00 7,500.00
0.150 kg Plamir Kayu 30,000.00 4,500.00
0.170 kg Cat dasar kayu 60,000.00 10,200.00
0.260 kg Cat minyak 83,520.00 21,715.20
0.070 OH Pekerja 150,000.00 10,500.00
0.009 OH Tukang 187,500.00 1,687.50
0.006 OH Kepala Tukang 202,500.00 1,215.00
0.003 OH Mandor 225,000.00 562.50
Jumlah 43,915.20 13,965.00 57,880.20
AN.13.b 1 m2 Mengecat bidang tembok baru (luar)
(1 lapis cat dasar , 2 lapis cat penutup).
0.100 kg Cat dasar tembok 68,205.00 6,820.50
0.360 kg Cat Tembok (Luar) 138,750.00 49,950.00
0.020 OH Pekerja 150,000.00 3,000.00
0.063 OH Tukang 187,500.00 11,812.50
0.006 OH Kepala Tukang 202,500.00 1,275.75
0.003 OH Mandor 225,000.00 562.50
Jumlah 56,770.50 13,650.75 70,421.25
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.13.c 1 m2 Mengecat bidang tembok baru (dalam)


(1 lapis cat dasar , 2 lapis cat penutup).
0.100 kg Cat dasar tembok 68,205.00 6,820.50
0.360 kg Cat tembok (dalam) 126,000.00 45,360.00
0.020 OH Pekerja 150,000.00 3,000.00
0.063 OH Tukang 187,500.00 11,812.50
0.006 OH Kepala Tukang 202,500.00 1,275.75
0.003 OH Mandor 225,000.00 562.50
Jumlah 52,180.50 13,650.75 65,831.25
AN.13.d 1 m2 Mengecat plafon eternit/ gypsum/Calsiboard
0.120 kg Cat dasar Tembok 68,205.00 8,184.60
0.180 kg Cat tembok (dalam) 126,000.00 22,680.00
0.028 OH Pekerja 150,000.00 4,200.00
0.042 OH Tukang 187,500.00 7,875.00
0.004 OH Kepala Tukang 202,500.00 850.50
0.003 OH Mandor 225,000.00 562.50
35,064.60 1,413.00 36,477.60
AN.13.e 1 m2 Mengecat list plank
0.120 kg Cat dasar Tembok 68,205.00 8,184.60
0.180 kg Cat Tembok (Luar) 138,750.00 24,975.00
0.028 OH Pekerja 150,000.00 4,200.00
0.042 OH Tukang 187,500.00 7,875.00
0.004 OH Kepala Tukang 202,500.00 850.50
0.003 OH Mandor 225,000.00 562.50
37,359.60 1,413.00 38,772.60
AN.13.f 1 m2 Waterproofing
1.000 kg Waterproofing 112,500.00 112,500.00
0.028 OH Pekerja 150,000.00 4,200.00
0.042 OH Tukang 187,500.00 7,875.00
0.004 OH Kepala Tukang 202,500.00 850.50
0.003 OH Mandor 225,000.00 562.50
Jumlah 116,700.00 1,413.00 118,113.00
AN.14 PEKERJAAN VEGETASI
AN.14.a 1 m2 Pupus Kompos Aktif
0.500 Zak Pupuk Kompos Aktif 37,500.00 18,750.00
Jumlah 18,750.00 18,750.00
AN.14.b 1 m2 Rumput Gajah Mini + Pupus Kompos Aktif
0.500 Phn Rumput Gajah Mini 67,500.00 33,750.00
1.000 M2 Pupuk Kompos Aktif (AN.14.a) 18,750.00 18,750.00
0.050 M3 Top Soil 180,000.00 9,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 Oh Kepala Tukang 202,500.00 1,012.50
0.003 Oh Mandor 225,000.00 675.00
1.000 Ls Alat bantu 3,000.00 3,000.00
Jumlah 61,500.00 7,687.50 69,187.50
AN.14.c Tanaman Bayam Merah
1.000 plbg Bayam Merah 7,500.00 7,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 22,183.13 4,687.50 26,870.63
AN.14.d Tanaman bakung Bunga Putih
1.000 plbg bakung Bunga Putih 12,750.00 12,750.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 27,433.13 4,687.50 32,120.63
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.14.e Tanaman Sambang Dara


1.000 plbg Sambang Dara 26,250.00 26,250.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 40,933.13 4,687.50 45,620.63
AN.14.f Tanaman Ararea
1.000 plbg Ararea 34,500.00 34,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 49,183.13 4,687.50 53,870.63
AN.14.g Tanaman Brokoli
1.000 plbg Brokoli 30,000.00 30,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 44,683.13 4,687.50 49,370.63
AN.14.h Tanaman Karambosa mini
1.000 plbg Karambosa mini 34,500.00 34,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.003 m3 Galian tanah (AN.01.a) 118,125.00 354.38
0.002 m3 Urugan tanah kembali (AN.01.c) 39,375.00 78.75
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 49,183.13 4,687.50 53,870.63
AN.14.i Tanaman Pohon Pucuk Merah 1 - 1.2 m
1.000 phn Pohon Pucuk Merah 1 - 1,2 m 172,500.00 172,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 193,837.50 4,687.50 198,525.00
AN.14.j Tanaman Pohon Tabe Buya Kuning 3 - 4 m
1.000 phn Pohon Tabe Buya Kuning 3 - 4 m 390,000.00 390,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 411,337.50 4,687.50 416,025.00
AN.14.k Tanaman Pohon Palm Ekor Tupai 3 - 4 m
1.000 phn Pohon Palm Ekor Tupai 3 - 4 m 675,000.00 675,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 696,337.50 4,687.50 701,025.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.14.l Tanaman Pohon Palm Botol 1 - 1.3 m


1.000 phn Pohon Palm Botol 1 - 1.3 m 637,500.00 637,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 658,837.50 4,687.50 663,525.00
AN.14.m Tanaman Pohon Palm Ponix 1.2 - 1.8 m
1.000 phn Pohon Palm Ponix 1.2 - 1.8 m 1,200,000.00 1,200,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 1,221,337.50 4,687.50 1,226,025.00
AN.14.n Tanaman Pohon Kelengkeng 1.2 - 1.8 m
1.000 phn Pohon Kelengkeng 1.2 - 1.8 m 382,500.00 382,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 403,837.50 4,687.50 408,525.00
AN.14.o Tanaman Pohon Mangga 1.2 - 1.8 m
1.000 phn Pohon Mangga 1.2 - 1.8 m 382,500.00 382,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 403,837.50 4,687.50 408,525.00
AN.14.p Tanaman Pohon Glodokan Tiang
1.000 phn Pohon Glodokan Tiang 300,000.00 300,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 321,337.50 4,687.50 326,025.00
AN.14.q Tanaman Pohon ketapang Kencana
1.000 phn Pohon Glodokan Tiang 300,000.00 300,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 321,337.50 4,687.50 326,025.00
AN.14.r Tanaman Airis
1.000 plbg Tanaman Airis 7,500.00 7,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 28,837.50 4,687.50 33,525.00
ANALISA HARGA SATUAN
Kota Bontang

JUMLAH JUMLAH
HARGA TOTAL HARGA
NO URAIAN PEKERJAAN HARGA HARGA
SATUAN (Rp) (Rp)
BAHAN (Rp) UPAH (Rp)

AN.14.s Tanaman Pisang - pisang


1.000 plbg tanaman Pisang - pisang 37,500.00 37,500.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 58,837.50 4,687.50 63,525.00
AN.14.t Tanaman Pohon Tabe Buya Besar
1.000 phn Pohon Tabe Buya Daun Besar 675,000.00 675,000.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 696,337.50 4,687.50 701,025.00
AN.14.u Tanaman Lamtana
1.000 plbg Bunga Lamtana 57,375.00 57,375.00
0.300 Zak Pupuk Kompos Aktif 37,500.00 11,250.00
0.045 m3 Galian tanah (AN.01.a) 118,125.00 5,315.63
0.045 m3 Urugan tanah kembali (AN.01.c) 39,375.00 1,771.88
1.000 Ls Alat Bantu 3,000.00 3,000.00
0.020 OH Pekerja 150,000.00 3,000.00
0.005 OH Kepala Tukang 202,500.00 1,012.50
0.003 OH Mandor 225,000.00 675.00
Jumlah 78,712.50 4,687.50 83,400.00
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

A UPAH
1 Pekerja Oh 150,000.00
2 Tukang Oh 187,500.00
3 Kepala Tukang Oh 202,500.00
4 Operator Pancang Oh 202,500.00
5 Mandor Oh 225,000.00

B BAHAN

I TANAH, PASIR & BATU


1 Tanah urug M3 225,000.00
2 Pasir urug M3
285,000.00
3 Pasir pasang M3 375,000.00
4 Pasir beton M3 555,000.00
5 Koral M3 555,000.00
6 Batu gunung M3 480,000.00
7 Batu Padas M3 262,500.00
8 bata merah Bh 1,800.00
9 Tiang pancang mini pile 25/25 m' 525,000.00

II SEMEN
1 Semen portland Kg 2,250.00 ###
2 Semen warna Kg 3,300.00
3 air ltr 135.00
4 Beton K-250 Redimix M3 2,625,000.00

III BESI
1 Besi beton Kg 33,000.00
2 Kawat bendrat Kg 33,000.00
3 Paku biasa 5cm - 10cm Kg 33,000.00
4 Paku 1 cm - 2,5 cm Kg 30,000.00
5 Paku ulin Kg 42,000.00
6 Paku plywood Kg 55,500.00
7 Paku Payung Kg 50,250.00
8 Paku genteng metal Kg 48,000.00
9 Paku Gypsum Kg 48,000.00
10 Besi profil Kg 33,000.00
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

11 Baja Besi IWF Kg 33,750.00


12 Besi Strip Kg 30,000.00 ###
13 Kawat Wiremesh M6 Kg 40,500.00 ###
###
IV KERAMIK
1 Keramik lantai 40/40 Bh 12,000.00
2 Keramik lantai 20/20 Bh 5,400.00
3 Keramik dinding 20/40 Bh 6,750.00
4 Plint keramik artistik Bh 11,250.00
5 Plint keramik lantai Bh 9,000.00
6 Batu Tempel/alam M2 270,000.00
7 Step Nosing Bh 15,450.00
8 Keramik list dinding 6x20 Bh 3,750.00
9 Granit Lantai 60/60 Bh 375,000.00
10 Roster Keramik Bh 11,250.00
11 Pas Batu Sikat M2 570,000.00
12 Keramik Homogenius 60/60 Bh 124,500.00
13 Keramik Homogenius 80/80 Bh 150,000.00
14 Keramik Homogenius 100/100 Bh 168,750.00
15 Paving Block Bh 6,000.00
16 Dinding Keramik Border 20/20 Bh 4,200.00
17 Keramik lantai 30/30 Bh 7,250.00

V KAYU
1 Kayu begisting M3 3,975,000.00
2 Kayu meranti balok M3 3,750,000.00
3 Kayu meranti papan M3 5,475,000.00
4 Kayu bengkirai balok M 3
8,175,000.00
5 Kayu bengkirai papan M 3
7,575,000.00
6 Kayu ulin balok M3 7,260,000.00
7 Kayu ulin papan M3 7,875,000.00
8 Dolken kayu galam Blg 46,875.00
9 Plywood tebal 9 mm Lbr 232,500.00
10 Plywood tebal 4 mm Lbr 97,500.00
11 Gypsum board tebal 9mm Lbr 112,500.00
12 Minyak begisting Ltr 41,250.00
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

VI ATAP
1 Genteng metal Lbr 142,500.00
2 Bubungan Genteng Metal M' 73,500.00
3 Seng Plat
seng BJLS 20 lebar 45 cm m 25,500.00
seng BJLS 20 lebar 55 cm m 27,000.00
seng BJLS 20 lebar 60 cm m 30,000.00
seng BJLS 20 lebar 70 cm m 33,000.00
seng BJLS 20 lebar 80 cm m 34,500.00
seng BJLS 20 lebar 90 cm m 37,500.00
seng BJLS 25 lebar 90 cm m 61,500.00
4 Pasang Kuda - Kuda Baja Ringan M2 375,000.00
5 Sisalation/ aluminium foil M2 9,000.00
6 Atap Zincalume M' 135,000.00
7 Genteng Keramik bh 37,500.00
8 Nok Genteng Keramik bh 26,250.00
9 Bubungan Zincalume M' 78,750.00
10 Genteng Bitumen Lbr 150,000.00
11 Nok Genteng Bitumen M 97,500.00

VII PLAPHOND
Calsi Board 4 mm lembar 131,250.00 Up-1
Calsi Board 9 mm lembar 281,250.00 Up-2
Paku Calsi Board dos 18,000.00 Up-3
Kompon pack 45,000.00 Up-4
Fiber Tape roll 60,000.00 Up-5
List Plafond Gypsum m1 50,250.00 Up-6
Paku Gypsum kg 45,750.00 Up-7
Gypsum Board Lembar 120,000.00 Up-8
Tepung Gypsum kg 6,750.00 Up-9
Rangka Plafond Metal Furring m2 165,000.00 Up-10
Dynabolt bh 6,750.00 Up-11
Ornamen Gypsum kecil m2 150,000.00 Up-12
Oenamen Gypsum Besar bh 180,000.00 Up-13
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N
VII KUSEN, PINTU & JENDELA
1 Kusen M' 112,500.00 h-KPJ-01
2 Daun Pintu Unit 1,425,000.00 h-KPJ-02
3 Daun Pintu wc ulin Unit 1,050,000.00 h-KPJ-03
4 Daun Pintu PJ Unit 1,200,000.00 h-KPJ-04
5 Expanyolet bh 300,000.00 h-KPJ-05
6 Lem Kayu kg 18,000.00 h-KPJ-06
7 Rolling Door M2 433,125.00 h-KPJ-07
8 Pintu Lipat (folding Gate) M2 2,165,625.00 h-KPJ-08
9 Rolling door aluminium M2 300,000.00 h-KPJ-09
10 Profil aluminium M' 92,250.00 h-KPJ-10
11 Profil aluminium Daun Jendela M' 67,500.00 h-KPJ-11
12 Plat Aluminium untuk Jalusi M' 45,000.00 h-KPJ-12
13 Prifil Kaca m' 12,000.00 h-KPJ-13
14 Skrup fixer Bh 1,200.00 h-KPJ-14
15 Sealant tube 9,000.00 h-KPJ-15
16 Daun pintu uk 100 cm Bh 1,525,000.00 h-KPJ-16
17 Daun jendela uk 60 cm t = 110 cm Bh 487,500.00 h-KPJ-17
18 Roster Bh 67,500.00 h-KPJ-18
19 Kaca bening tebal 5mm M2 187,500.00 h-KPJ-19
20 Kaca Buram tebal 5mm M2 225,000.00 h-KPJ-20
21 Kaca riben/gelap tebal 5mm M2 195,000.00 h-KPJ-21
22 Kaca bening tebal 8mm M2 232,500.00 h-KPJ-22
23 Kaca riben/gelap tebal 8mm M2 240,000.00 h-KPJ-23
24 Kaca Cermin M2 37,500.00 h-KPJ-24
25 Engsel pintu 4" Bh 75,000.00 h-KPJ-25
26 Engsel jendela 3" Bh 58,500.00 h-KPJ-26
27 Kunci pintu 2 slag Bh 225,000.00 h-KPJ-27
28 Kunci kamar mandi Bh 260,250.00 h-KPJ-28
29 Kunci Silinder Bh 354,000.00 h-KPJ-29
30 Hendel Pintu Bh 300,000.00 h-KPJ-30
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

31 Grendel pintu Bh 39,000.00 h-KPJ-31


32 Grendel jendela Bh 30,000.00 h-KPJ-32
33 Hak angin Psg 47,640.00 h-KPJ-33
34 Tarikan jendela Bh 22,500.00 h-KPJ-34
35 Sunscren Besi Hollow M2 450,000.00 h-KPJ-35
36 Rel Bawah (pintu Garasi) Bh 570,000.00 h-KPJ-36
37 Rel Atas (Pintu Garasi) Bh 675,000.00 h-KPJ-37
38 Engsel Atas Tengah (pintu Garasi) Bh 292,500.00 h-KPJ-38
39 Engsel Atas Pinggir (pintu Garasi ) bh 270,000.00 h-KPJ-39
40 Engsel Bawah Tengah (pintu Garasi) Bh 195,000.00 h-KPJ-40
41 Engsel Bawah Pinggir (pintu Garasi ) bh 150,000.00 h-KPJ-41
42 Pintu Garasi Bh 1,350,000.00 h-KPJ-42
43 Pintu km/wc PVC Bh 1,125,000.00 h-KPJ-43
44 Rambuncis Bh 52,500.00 h-KPJ-44
45 Engsel jendela casement Bh 214,500.00 h-KPJ-45

VIII SANITAIR
1 Pipa PVC Ø 2" M' 32,812.50 Sanitair-01
2 Pipa PVC Ø 1/2" M' 15,000.00 Sanitair-02
3 Pipa PVC Ø 3/4" M' 19,500.00 Sanitair-03
4 Pipa PVC Ø 4" M' 86,625.00 Sanitair-04
5 Pipa PVC Ø 3" M' 110,812.50 Sanitair-05
6 Kran 1/2" Bh 37,500.00 Sanitair-06
7 Seal tape Bh 4,350.00 Sanitair-07
8 Closed Duduk Unit 4,687,500.00 Sanitair-08
9 Closet Jongkok Unit 304,920.00 Sanitair-09
10 Urinoir Unit 2,945,250.00 Sanitair-10
11 Wastafel Unit 1,472,625.00 Sanitair-11
12 Floor drain Bh 37,500.00 Sanitair-12
13 Septictank Biofil+obat kap 2-4org Unit 6,750,000.00 Sanitair-13
14 Septictank Biofil+obat kap 4-6org Unit ### Sanitair-14
15 Tandon air 1.200 L Fiber Unit 2,550,000.00 Sanitair-15
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

16 Jet washer Unit 150,000.00 Sanitair-16


17 Kran Shower Unit 225,000.00 Sanitair-17
18 Bak mandi Fiber Unit 600,000.00 Sanitair-18
19 Pipa PVC Ø 6" M' 210,000.00 Sanitair-19

IX INSTALASI LISTRIK
1 Lampu SL 8 Watt + Acc Downlight Bh 75,000.00 listrik-01
2 Lampu SL 18 Watt Bh 63,000.00 listrik-02
3 Lampu TL 18 Watt Bh 75,000.00 listrik-03
4 Stop kontak Bh 75,225.00 listrik-04
5 Saklar tunggal Bh 69,300.00 listrik-05
6 Saklar ganda Bh 96,150.00 listrik-06
7 Saklar Empat Bh 102,000.00 listrik-07
8 Fiting lampu Bh 55,440.00 listrik-08
9 Kabel NYM 3 x 2,5 mm m' 11,250.00 listrik-09
10 Pipa pralon 5/8" btg 16,500.00 listrik-10
11 Panel BOX Bh 225,000.00 listrik-11
12 Reflektor + Lampu TL 2x18 Bh 450,000.00 listrik-12
13 Acc Lampu Tl 2x18w Unit 60,000.00 listrik-13
14 Instalasi listrik titik 450,000.00 listrik-14
15 Lampu Gantung Hias Dalam Unit 3,000,000.00 listrik-15
16 Lampu Gantung Hias Luar titik 1,500,000.00 listrik-16
17 Stop Kontak AC Unit 67,500.00 listrik-17
18 MCB Bh 375,000.00 listrik-18
19 Lampu DownLight LED 6 Watt Bh 172,500.00 listrik-19
20 Lampu DownLight LED 3 Watt Bh 127,500.00 listrik-20
21 Lampu Downlight outbow 2 warna LED 6 Wat Bh 337,500.00 listrik-21
22 OutBow Lighting PLC 25 Watt Bh 300,000.00 listrik-22
23 Baret Light 30 Watt Bh 520,000.00 listrik-23
24 Reccessed Downlight 10 Watt Bh 250,000.00 listrik-24
25 Exchaust Fan Bh 325,000.00 listrik-25
26 Pasang Lighting Panel Bh ### listrik-26
27 Garden Light Bh 150,000.00 listrik-27
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N
X CAT
1 Plamir Kayu Kg 30,000.00
2 Plamir Tembok Kg 30,000.00
3 Cat dasar Kayu Kg 60,000.00
4 Cat dasar Tembok Kg 68,205.00
5 Cat tembok (dalam) Kg 126,000.00
6 Cat Tembok (Luar) Kg 138,750.00
7 Cat minyak Kg 83,520.00
8 Cat meni Kg 37,500.00
9 Thiner A spesial Ltr 30,000.00
10 Waterproofing Kg 112,500.00

C Lain - Lain
1 Crane Service 1Jam 28,125.00 Up-LL - 1
2 Hidrolic Jack Hammer 1 Jam 46,875.00 Up-LL - 2
3 Solar Ltr 15,750.00 Up-LL - 3
4 Minyak Pelumas Ltr 52,500.00 Up-LL - 4
5 Sewa Perakitan 1 Jam 15,000.00 Up-LL - 5
6 Sewa Alat Las 1 Jam 9,375.00 Up-LL - 6
7 Kawat las Listrik Kg 37,500.00 Up-LL - 7
8 Upah Bobok kepala mini pile titik 75,000.00 Up-LL - 8
9 Relling Stenlis pipa Ø 3" m' 412,500.00 Up-LL - 9
10 Tulisan Plat Stenlis Unit 7,500,000.00 Up-LL - 10
11 Bak Kontrol Unit 900,000.00 Up-LL - 11
12 Alat bantu Ls 3,000.00 Up-LL - 12
13 Pagar Geser 1 m2 M2 1,350,000.00 Up-LL - 13
14 Pagar Hollow Galvanis M2 900,000.00 Up-LL - 14
15 Tulisan papan Nama Plat Besi' Unit 7,500,000.00 Up-LL - 15
16 1 m Grill Parit M' 300,000.00 Up-LL - 16
17 Plat Papan Nama + Rangka M2 1,200,000.00 Up-LL - 17
18 Non Moven Gotextile M2 12,000.00 Up-LL - 18

Pagar BRC Lengkap dengan Tiang, P = 2,4


19 M2 1,137,000.00 Up-LL- 19
M/T = 0,9/Ø 6" mm
HARGA SATUAN UPAH DAN BAHAN
Kota Bontang

SATUA
NO URAIAN HARGA (Rp)
N

20 Zink / Tempat Cuci + Kran Unit 675,000.00 Up-LL- 20

D Vegetasi
1 Pupuk Kompos Aktif zak 37,500.00 Up-V -1
2 Top Soil m3 180,000.00 Up-V -2
3 Tanaman Airis polibag 7,500.00 Up-V -3
4 tanaman Pisang - pisang Polibag 37,500.00 Up-V -4
5 Rumput Gajah Mini Polibag 67,500.00 Up-V -5
6 Bayam Merah Polibag 7,500.00 Up-V -6
7 bakung Bunga Putih Polibag 12,750.00 Up-V -7
8 Sambang Dara Polibag 26,250.00 Up-V -8
9 Ararea Polibag 34,500.00 Up-V -9
10 Brokoli Polibag 30,000.00 Up-V -10
11 Karambosa mini Polibag 34,500.00 Up-V -11
12 Pohon Tabe Buya Kuning 3 - 4 m Pohon 390,000.00 Up-V -12
13 Pohon Glodokan Tiang Pohon 300,000.00 Up-V -13
14 Pohon Pucuk Merah 1 - 1,2 m Pohon 172,500.00 Up-V -14
15 Pohon Ketapang kencana Pohon 675,000.00 Up-V -15
16 Pohon Palm Ekor Tupai 3 - 4 m Pohon 675,000.00 Up-V -16
17 Pohon Palm Botol 1 - 1.3 m Pohon 637,500.00 Up-V -17
18 Pohon Palm Ponix 1.2 - 1.8 m Pohon 1,200,000.00 Up-V -18
19 Pohon Kelengkeng 1.2 - 1.8 m Pohon 382,500.00 Up-V -19
20 Pohon Mangga 1.2 - 1.8 m Pohon 382,500.00 Up-V -20
21 Pohon Tabe Buya Daun Besar Pohon 675,000.00 Up-V -21
22 Bunga Lamtana Polibag 57,375.00 Up-V -22
pintu p1
Kusen alumunium
2.1
2.1
7.2
2.4
0.6
Daun Pintu
2.05
1.64
0.8

jendela J1
Kusen alumunium
4.5
2.38
0.56 10.62
2.38
0.8
Daun Jendela
0.34
1.74
1.4
Kaca bening
1.26 0.34 0.4284
0.56 0.675 0.756
1.1844

Jendela J2
6
1.68 9.6
1.92
Daun jendela
3.7
5.38
1.68
Kaca bening
0.785 0.42 0.6594
0.48 0.45 0.432
0.48 0.9 0.432
1.5234

Jendela J3
1.15 4 4.6
6.82
0.37 6 2.22
Kaca Bening
0.37 0.5 0.74

Jendela J4
1.5 3 4.5
0.56 4 2.24
0.48 2 0.96 10.68
1.19 2 2.38
0.2 3 0.6
Daun jendela
1.4 2 2.8
3.48
0.34 2 0.68
Kaca bening
0.443 0.56 0.74424
1.17264
1.26 0.34 0.4284

Jendela J5
2 3 6
0.6 2 1.2 8.55
0.45 3 1.35
Daun Jendela
1.45 2 2.9 3.48
0.29 2 0.58
Kaca Bening
0.6 1.9 1.14
0.29 1.29 0.3741 1.6941
0.4 0.45 0.18

Pintu P3
2.15 3 6.45
0.8 1 0.8 9.75
0.5 5 2.5
Daun Pintu
2.1 0.8 1.68
Kaca bening
0.5 0.475 0.95

Jendela J6
2.15 2 4.3 5.65
0.45 3 1.35
Daun Jendela
1.45 2 2.9 3.48
0.29 2 0.58
Kaca Bening
0.45 0.55 0.2475 0.6216
0.29 1.29 0.3741

Jendela J7
0.95 3 2.85
0.45 3 1.35 5.4
0.6 2 1.2
Kaca Bening
0.6 0.85 0.51 0.87
0.4 0.45 0.36

Bouven 1
0.7 2 1.4 2.4
0.5 2 1
Kaca Buram
0.6 0.4 0.24

Pintu P4
2.15 2 4.3 6.3
2 1 2
Daun Pintu
1 2.1 4.2

Anda mungkin juga menyukai