Item : RAB RSCK

Proyek : Rumah Sakit Cahya Kawaluyaan 015/RAB/TST-RSCK/II/20


Pekerjaan : Kanopi Rooftop (Cladding ACP & Jalusi) 3-Feb-2020
Lokasi : Kota Baru Parahyangan

No Uraian Pekerjaan Volume Sat Harga Sat Jumlah Sub Total


(Rp) (Rp) (Rp)
A Pekerjaan Persiapan
1 Pek. Mob demob peralatan 1.00 ls 1,000,000 1,000,000
2 Pek. Pengukuran 1.00 m1 800,000 800,000
3 Peralatan K3 APD (alat pelindung diri) 1.00 ls 7,500,000 7,500,000
4 Pek. Shopdrawing dan as built drawing 1.00 ls 2,000,000 2,000,000
5 Foto Dokumentasi dan komunikasi 1.00 ls 2,000,000 2,000,000
6 Pek. Instalasi Winch 1.00 ls 5,500,000 5,500,000
Total A 18,800,000
B Pekerjaan Struktur
1 Pek. Pedestal 30.00 titik 117,500 3,525,000
2 Pek. Baseplate 350 x 250 x 10 mm 292.40 kg 19,320 5,649,080
3 Pek. Hilti Anchoor Bolt 16 mm 120.00 bh 71,500 8,580,000
4 Pek. Plat stiffner di base plate 500 x 200 x 10 mm 6.68 kg 19,320 129,122
5 Pek. Kolom IWF 250.125.6.9 1,724.38 kg 19,320 33,314,975
6 Pek. Balok Memanjang IWF 200.100.5.5.8 (Tie Beam) 5,677.51 kg 19,320 109,689,563
7 Pek. Balok Melintang IWF 200.100.5.5.8 HC (Rafter) 4,085.55 kg 19,320 78,932,762
8 Pek. Balok Melintang IWF 200.100.5.5.8 (Rafter ujung) 794.58 kg 19,320 15,351,311
9 Pek. Plat stiffner balok 200 x 50 x 9 mm 1,353.28 kg 19,320 26,145,277
10 Pek. Plat joint stiffner balok 390 x 100 x 9 mm 385.02 kg 19,320 7,438,540
11 Pek. Haunc / Voute Balok WF 200.100.5.5.8 1,126.40 kg 19,320 21,762,048
12 Pek. Nut and Bolt dia. 16 mm 1,056.00 bh 15,313 16,170,000
13 Pek. Gording, Lipped Channel 150.65.20.2.3 7,447.43 kg 19,320 143,884,270
14 Pek. Lisplang Talang, Lipped Channel 150.65.20.2.3 944.34 kg 19,320 18,244,736
15 Pek. Lisplang Ampig, Lipped Channel 150.65.20.2.3 517.46 kg 19,320 9,997,260
16 Pek. Plat Gording, Lipped Channel 100.100.7.10.5 362.43 kg 19,320 7,002,208
17 Pek. Nut and Bolt gording dia. 12 mm 1,060.40 bh 15,313 16,237,375
18 Pek. Bracing lintang Double Equal 20.20.2 562.04 kg 14,700 8,262,048
19 Pek. Plat Span lintang 1 300 x 200 x 6 mm 224.58 kg 19,320 4,338,851
20 Pek. Frame Boardesk Solarhart Lipped Channel 100.50.20.2.5 106.08 kg 19,320 2,049,466
21 Pek. Equal 20.20.2 2 21.24 kg 19,320 410,357
22 Pek. Equal 20.20.2 2 21.24 kg 19,320 410,357
23 Pek. Bracing Equal 20.20.2 2 11.50 kg 19,320 222,084
24 Pek. Peninggian Pedestal 30.00 bh 250,000 7,500,000
25 Pek. Pembuatan Tangga Access 4.00 unit 1,080,000 4,320,000
26 Pek. Penutup Access 4.00 unit 687,500 2,750,000
27 Pek. Tracktstang 175.37 kg 14,700 2,577,983
28 Pek. Turn Buckle stang 28.00 bh 49,500 1,386,000
29 Pek. Reinstall & installation Pipe Solahart 4.00 unit 2,000,000 8,000,000
Total B 564,280,671
C Pekerjaan Atap
1 Pek. Spandex 963.92 m2 114,000 109,887,265
2 Pek. Solartuff Grey 132.52 m2 247,250 32,765,671
2
3 Pek. Cladding ampig ACP + rangka besi hollow 84.83 m 812,500 68,921,450
4 Pek. Cladding belakang ACP + rangka besi hollow 13.86 m2 812,500 11,261,250
5 Kusen Jalusi J1 uk. 0.88x1.19 m 18.00 bh 720,000 12,960,000
6 Kusen Jalusi J1 uk. 0.70x1.22 m 16.00 bh 696,000 11,136,000
7 Pasang flashing atap 264.00 m1 65,050 17,173,200
Total C 264,104,836
D Pekerjaan Saluran
1 Pek. Instalasi talang datar 140.17 m1 97,875 13,719,139
1
2 Pek. Dudukan talang datar 140.17 m 35,000 4,905,950
3 Pek. Talang vertikal pipa pvc 5" D + accessories 302.37 m1 128,150 38,748,716
4 Pek. Talang vertikal gabungan 8" D + accessories 259.20 m1 582,300 150,932,160
5 Dudukan talang pipa 5" 152.00 bh 42,000 6,383,790
6 Dudukan talang pipa 8" 130.00 bh 114,000 14,820,000
7 Cover flashing zincalume talang pipa PVC turun 216.00 m1 130,000 28,080,000
8 Pek. Roof drain talang datar + accessories 8.00 bh 150,000 1,200,000
Total D 258,789,754
E Pekerjaan Pengecatan
1 Pek. Pengecatan zinchromate 25,839.50 kg 650 16,795,676
Total E 16,795,676