Anda di halaman 1dari 34

1 cakar ayam

besi 10 1 50 50 50 50 10
2
3 45 25 45 25 10
4 20 20 30 20 5

besi 6 5 20 20 20 20 5

beton
vol 0.5 0.5 0.5 0.125
komposisi beton k225
semen 371 kg 7.42 1.2 8.904 9
pasir 698 kg 0.4985714 1.2 0.5982857142857 0.6
split 1047 kg 0.5816667 1.2 0.698 0.7
air 215 l 250
Berat 1 Kubik Pasir = 1400 Kg
Berat 1 Kubik Split = 1800 Kg
besi wiremash 6
luas area 6 4 24
luas wiremash 2.1 5.4 11.34 2.1164021
0.1 6 4 2.4
slof
slof4 m 4 4 4 4 0.1 16.1
slof 6m 6 6 6 6 0.1 24.1
besi 6 30 200 201
20 20 20 20 20 10
40 27
40 27
40 27
120 81 201
vol beton sloof 30 0.2 0.15 0.9
begisting 0.2 6 2.4 3 7.2
0.2 4 1.6 3 4.8
12

galian tanah 0.5 0.5 0.5 0.125

beton lantai 0.07 4 6 1.68


1.68

2
urug pasir 0.1 4 6 2.4

6 4 24 21,960,875 915,036
5 1.2 6 5,490,219
1.5 1.2 1.8 1,647,066
29,098,159
600,000
1,000,000
30,698,159

RADIOLOGI

URUG PASIR
urug pasir 0.1 1.2 5 0.6
LUAS 1.2 5 6
SLOF
1 4 1.2 3 14.4 12 1.2
4 5.1 3 61.2 12 5.1
6.3
BESI 6 120 15 9 3 27
500 15 35 3 105
132 90

13.6 0.2 0.2 0.544


2.72
BETON LANTAI 0.07 1.2 5 0.42

RM

URUG PASIR
urug pasir 0.1 1.2 1.5 0.18
LUAS 1.2 1.5 1.8
SLOF
1 4 1.2 2 9.6 12 0.8
4 5.1 2 40.8 12 3.4
4.2
BESI 6 120 15 9 2 18
150 15 35 2 70
88 90

0.2 1.2 1.5 0.36


5.4 0.2 1.08

BETON LANTAI 0.07 1.2 1.5 0.126


jml
210 4 840
0
150 8 1200 1.5
95 4 380 0.5 0.5 0.5 0.125

455 2420
24.2
2.0166667
85 3 85
0.0708333

1650000
zak 60,000 540,000 50 235,714 0.5
m3 350,000 210,000 94.070081 1
m3 375,000 262,500 141.10512 1.5

1,012,500 1.2 5

125 4

jml 0.2 0.2


1.3416667 1.4 3 4.2 5
2.0083333 2 3 6
11
110
11
18
11880
1200
9.9

7920
1200
6.6
12
6 9
6 0.75

500
500
500
1.2
Item : RAB
Proyek : Rumah Sakit Cahya Kawaluyaan
Pekerjaan : PONDASI OUTDOOR AC - PT. ARYA JAYA
Lokasi : Kota Baru Parahyangan
RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AHU POLIKLINIK
Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
1 Pondasi jumlah jlm Jlm keb
galian 0.125 m3 9 1.125 100,000
urug pasir 2 m3 2 350,000
Total 1
2 pondasi cakar ayam jml sat 9 harga
besi 10 2.1 btg 9 18.9 19 80,000
besi 6 0.07 btg 9 0.63 1 55,000
beton site mix K225 0.125 m3 9 1.125 1.2 1,200,000
tenaga
total 2
3 Sloof
besi 10 11 btg 11 80,000
besi 6 18 btg 18 55,000
beton site mix K225 0.9 m3 1 0.9 1,200,000
Begisting 12 m2 12 150,000
tenaga
total 3
lantai
wiremash 6 24 m2 11.34 2.116402116402 2.2 400,000
beton untuk lantai 24 m2 2.4 2.4 1,200,000
tenaga
total 4
Pekerjaan finishing 24 m2 24 100,000
Total 5
kawat bendrat 10 10 20,000
TOTAL 1+2+3+4+5
TENAG 7,000,000
LAMA PENGERJAAN :7 HARI KERJA, 4 ORANG
RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC RADIOLOGI
Base Out Dor Unit AHU 1-4 (radiologi)
1 Pondasi jumlah jlm Jlm keb
galian 0.125 m3 6 0.75 100,000
urug pasir 0.6 m3 0.6 350,000
Total 1
2 pondasi cakar ayam jml sat 6 harga
besi 10 2.1 btg 4 18.9 19 80,000
besi 6 0.07 btg 9 0.63 1 55,000
beton site mix K225 0.125 m3 9 1.125 1.2 1,200,000
tenaga
total 2
3 Sloof
besi 10 7 btg 7 80,000
besi 6 10 btg 10 55,000
beton site mix K225 0.6 m3 1 0.6 1,200,000
Begisting 3 m2 3 150,000
tenaga
total 3
lantai
wiremash 6 6 m2 11.34 0.529100529101 0.6 400,000
beton untuk lantai 0.5 M3 0.5 0.5 1,200,000
tenaga
total 4
Pekerjaan finishing 6 m2 6 100,000
Total 5
kawat bendrat 5 5 20,000
TOTAL 1+2+3+4+5
TENAG 5,500,000
LAMA PENGERJAAN :5 HARI KERJA, 4 ORANG
RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC RM
Base Out Dor Unit AHU 1-2B (RM)
1 Pondasi jumlah jlm Jlm keb
galian 0.125 m3 4 0.5 100,000
urug pasir 0.2 m3 0.2 350,000
Total 1
2 pondasi cakar ayam jml sat 6 harga
besi 10 2.1 btg 4 8.4 12 80,000
besi 6 0.07 btg 4 0.28 1 55,000
beton site mix K225 0.125 m3 4 0.5 0.5 1,200,000
tenaga
total 2
3 Sloof
besi 10 5 btg 5 80,000
besi 6 7 btg 7 55,000
beton site mix K225 0.4 m3 1 1 1,200,000
Begisting 2 m2 2 150,000
tenaga
total 3
lantai
wiremash 6 1.8 m2 11.34 0.15873015873 0.6 400,000
beton untuk lantai 0.2 M3 0.2 0.2 1,200,000
tenaga
total 4
Pekerjaan finishing 1.5 m2 1.5 100,000
Total 5
kawat bendrat 3 3 20,000
TOTAL 1+2+3+4+5
TENAG 5,000,000
LAMA PENGERJAAN :3 HARI KERJA, 4 ORANG
TOTOL
data kebutuhan bahan

1 Pondasi jumlah jlm Jlm keb


galian 2.375 100,000
urug pasir 2.8 350,000
Total 1
2 pondasi cakar ayam harga
besi 10 50 80,000
besi 6 3 55,000
beton site mix K225 2.9 1,200,000
tenaga
3 Sloof
besi 10 23 80,000
besi 6 35.425 55,000
beton site mix K225 2.5 1,200,000
Begisting 17 150,000
tenaga
total 3
lantai
wiremash 6 3.4 400,000
beton untuk lantai 3.1 1,200,000
tenaga
total 4
Pekerjaan finishing 31.5 100,000
Total 5
kawat bendrat 18 20,000
TOTAL 1+2+3+4+5

Galian 1.125 0.75


Pasir urug

RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AHU POLIKLINIK


Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
1 Pondasi Jlm keb Jlm kebJlm keb
galian 1.125 1 0.5 2.375 100000 237,500
urug pasir 2 1 0.2 2.8 350000 980,000
-
2 pondasi cakar ayam harga
besi 10 19 19 12 50 80000 4,000,000
besi 6 1 1 1 3 55000 165,000
beton site mix K225 1.2 1 0.5 2.9 1200000 3,480,000
tenaga 2500000 ### 2000000 7000000 7,000,000
3 Sloof -
besi 10 11 7 5 23 80000 1,840,000
besi 6 18.425 10 7 35.425 55000 1,948,375
beton site mix K225 0.9 1 1 2.5 1200000 3,000,000
Begisting 12 3 2 17 150000 2,550,000
tenaga 2500000 ### 2000000 6500000 6,500,000
-
lantai -
wiremash 6 2.2 1 0.6 3.4 400000 1,360,000
beton untuk lantai 2.4 1 0.2 3.1 1200000 3,720,000
tenaga 2000000 ### 1000000 4000000 4,000,000
total 4
Pekerjaan finishing 24 6 1.5 31.5 100000 3,150,000
Total 5
kawat bendrat 10 5 3 18 20000 360,000
44,290,875
TENAG 7000000
LAMA PENGERJAAN :7 HARI KERJA, 4 ORANG

1 Pondasi Vol Sat


galian 2.375 3 M3
urug pasir 2.8 3 M3
besi 10 73 75 Btg
besi 6 38.425 40 Btg
beton site mix K225 8.5 8.5 M3
tenaga 17,500,000 18 Rp
Begisting 17 17 M2
wiremash 6 3.4 4 Lmb
Pekerjaan finishing 31.5 32 M2
kawat bendrat 18 18 kg
RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AH
Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
1 Pondasi Jlm keb
112,500 galian 1.125
700,000 urug pasir 2
812,500
2 pondasi cakar ayam
1,520,000 besi 10 19
55,000 besi 6 1
1,440,000 beton site mix K225 1.2
2,500,000 tenaga 2500000
5,515,000 612,778
3 Sloof
880,000 besi 10 11
1,013,375 besi 6 18.425
1,080,000 beton site mix K225 0.9
1,800,000 Begisting 12
2,500,000 30 tenaga 2500000
7,273,375 242,446
lantai
880,000 wiremash 6 2.2
2,880,000 beton untuk lantai 2.4
2,000,000 tenaga 2000000
5,760,000
2,400,000 Pekerjaan finishing 24
2,400,000
200,000 kawat bendrat 10
21,960,875
TENAGA 7000000
LAMA PENGERJAAN :7 HARI KERJA, 4 ORANG

75,000
210,000
285,000

1,520,000
55,000
1,440,000
2,500,000
5,515,000

560,000
550,000
720,000
450,000
2,000,000
4,280,000

240,000
600,000
1,000,000
1,840,000
600,000
600,000
100,000
12,620,000

50,000
70,000
120,000

960,000
55,000
600,000
2,000,000
3,615,000

400,000
385,000
1,200,000
300,000
2,000,000
4,285,000

240,000
240,000
1,000,000
1,480,000
150,000
150,000
60,000
9,710,000

44,290,875
237,500
980,000
1,217,500

4,000,000
165,000
3,480,000
2,000,000

1,840,000
1,948,375
3,000,000
2,550,000
2,000,000

1,360,000
3,720,000
1,000,000

3,150,000
3,150,000
360,000
#REF!

0.5 2.375
Harga
100,000 300,000
350,000 1,050,000
77,000 5,775,000
50,000 2,000,000
1,200,000 10,200,000
17,500,000
150,000 2,550,000
370,000 1,480,000
100,000 3,200,000
20,000 360,000
44,415,000.0
DASI OUTDOR AC SAMPING AHU POLIKLINIK
0 (samping poliklinik)
Jlm keb Jlm keb
0.75 0.5 2.375 100,000 237,500
0.6 0.2 2.8 350,000 980,000
-
harga
19 12 50 80,000 4,000,000
1 1 3 55,000 165,000
1.2 0.5 2.9 1,200,000 3,480,000
2500000 2000000 7,000,000 7,000,000
-
-
7 5 23 80,000 1,840,000
10 7 35.425 55,000 1,948,375
0.6 1 2.5 1,200,000 3,000,000
3 2 17 150,000 2,550,000
2000000 2000000 6,500,000 6,500,000
-
-
0.6 0.6 3.4 400,000 1,360,000
0.5 0.2 3.1 1,200,000 3,720,000
1000000 1000000 4,000,000 4,000,000
total 4
6 1.5 31.5 100,000 3,150,000
Total 5
5 3 18 20,000 360,000
44,290,875
Item : RAB
Proyek : Rumah Sakit Cahya Kawaluyaan
Pekerjaan : PONDASI OUTDOOR AC - PT. ARYA JAYA
Lokasi : Kota Baru Parahyangan

Rekapitulasi :
1 Pekerjaan Persiapan + Pembersihan area Rp 1,500,000
2 Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik) Rp 21,960,875
3 Base Out Dor Unit AHU 1-4 (radiologi) Rp 12,620,000
4 Base Out Dor Unit AHU 1-2B (RM) Rp 9,710,000

Rp 45,790,875
Item : RAB
Proyek : Rumah Sakit Cahya Kawaluyaan
Pekerjaan : PONDASI OUTDOOR AC - PT. ARYA JAYA
Lokasi : Kota Baru Parahyangan
RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AHU POLIKLINIK

No Item Pekerjaan Vol Sat Harga Sat


I Pekerjaan Persiapan 1.00 Ls 2,000,000
Pembersihan area
Mobilisasi alat dan bahan
Peralatan pendukung
Perlengkapan K3
Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
I Pondasi
1 galian 1.10 M3 100,000
2 urug pasir 2.00 M3 350,000
II pondasi cakar ayam : 9.00 Bh 612,778
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 30.00 M' 242,445
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 24.00 M2 240,000
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 26.00 M2 100,000
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
JUMLAH I
Base Out Dor Unit AHU RADIOLOGI
I Pondasi
1 galian 0.75 M3 100,000
2 urug pasir 0.60 M3 350,000
II pondasi cakar ayam : 6.00 Bh 919,166.67
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 13.60 M' 314,706
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 6.00 M2 306666.67
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 7.00 M2 100,000
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
JUMLAH I

Base Out Dor Unit AHU RM


I Pondasi
1 galian 0.50 M3 100,000
2 urug pasir 0.20 M3 350,000
II pondasi cakar ayam : 4.00 Bh 903,750
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 5.40 M' 793,519
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 1.80 M2 822,222
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 1.50 M2 100,000
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
JUMLAH I

Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
I Pondasi
1 galian 1.10 M3 100,000
2 urug pasir 2.00 M3 350,000
II pondasi cakar ayam : 9.00 Bh 612,778
III Sloof 0.2 x 0.2 x 30 m 30.00 M' 242,445
IV lantai 6 x 4 m 24.00 M2 240,000
V Pekerjaan finishing 26.00 M2 100,000
IV lantai 6 x 4 m 1.80 M2 822,222
JUMLAH I
Base Out Dor Unit AHU RADIOLOGI
I Pondasi
1 galian 0.75 M3 100,000
2 urug pasir 0.60 M3 350,000
II pondasi cakar ayam : 6.00 Bh 919,166.67
III Sloof 0.2 x 0.2 x 30 m 13.60 M' 314,706
IV lantai 6 x 4 m 6.00 M2 306666.67
V Pekerjaan finishing 7.00 M2 100,000
JUMLAH I
Base Out Dor Unit AHU RM
I Pondasi
1 galian 0.50 M3 100,000
2 urug pasir 0.20 M3 350,000
II pondasi cakar ayam : 4.00 Bh 903,750
III Sloof 0.2 x 0.2 x 30 m 5.40 M' 793,519
IV lantai 6 x 4 m 1.80 M2 822,222
V Pekerjaan finishing 1.50 M2 100,000
JUMLAH I

I Pondasi
1 galian 2.35 100,000
2 urug pasir 2.80 350,000
II pondasi cakar ayam : 19.00 811,898
III Sloof 0.2 x 0.2 x 30 m 49.00 450,223
IV lantai 6 x 4 m 31.80 456,296
V Pekerjaan finishing 34.50 100,000

I Pondasi
1 galian 2.35 M3 100,000
2 urug pasir 2.80 M3 325,000
II pondasi cakar ayam : 19.00 Bh 575,000
III Sloof 0.2 x 0.2 x 30 m 49.00 m' 425,000
IV lantai 6 x 4 m 31.80 M2 250,000
V Pekerjaan finishing 34.50 M2 100,000
Jumlah
Rp2,000,000.00

Rp110,000.00 112,500
Rp700,000.00 700,000
Rp5,515,002.00 5,515,000

Rp7,273,350.00 7,273,375 242445.83 panjang begesting 60


0.2 12
luas lantai 6 4

Rp5,760,000.00 5,760,000

Rp2,600,000.00 2,600,000

Rp21,958,352.00 21,960,875
-Rp2,523.00

Rp75,000.00 75000
Rp210,000.00 210000
Rp5,515,000.00 5,515,000 919166.67
13.6
Rp4,280,000.00 4,280,000 314705.88 S p l
sloof 13.6 0.2
lantai 1.2 5

Rp1,840,000.00 1,840,000 306666.67

Rp700,000.00 700,000.00

Rp12,620,000.00 12,620,000
Rp0.00

Rp50,000.00 50,000
Rp70,000.00 70,000
Rp3,615,000.00 3,615,000 903750.00

Rp4,285,000.00 4,285,000 793518.52

Rp1,480,000.00 1,480,000 822222.22

Rp150,000.00 150,000

Rp9,650,000.00 9,650,000
Rp0.00
Rp46,228,352.00 46,230,875
-Rp2,523.00
Rp110,000.00 112,500
Rp700,000.00 700,000
Rp5,515,002.00 5,515,000
Rp7,273,350.00 7,273,375 242445.83 panjang begesting 60
Rp5,760,000.00 5,760,000
Rp2,600,000.00 2,600,000
Rp1,480,000.00 1,480,000 822222.22
Rp4,080,000.00 4,080,000
Rp0.00

Rp75,000.00 75000
Rp210,000.00 210000
Rp5,515,000.00 5,515,000 919166.67
Rp4,280,000.00 4,280,000 314705.88 S p l
Rp1,840,000.00 1,840,000 306666.67
Rp700,000.00 700,000.00
Rp12,620,000.00 12,620,000

Rp50,000.00 50,000
Rp70,000.00 70,000
Rp3,615,000.00 3,615,000 903750.00
Rp4,285,000.00 4,285,000 793518.52
Rp1,480,000.00 1,480,000 822222.22
Rp150,000.00 150,000
Rp9,650,000.00 9,650,000

235,000
980,000
15,426,066
22,060,934
14,510,222
3,450,000
56,662,222
44000000

235,000
910,000
10,925,000
20,825,000
7,950,000
3,450,000
44,295,000
24
t
0.2 0.544
6
t
I Pondasi
1 galian 2.35 M3 100,000 235,000
2 urug pasir 2.80 M3 325,000 910,000
II pondasi cakar ayam : 19.00 Bh 550,000 10,450,000
III Sloof 0.2 x 0.2 x 30 m 49.00 m' 425,000 20,825,000
IV lantai 6 x 4 m 31.80 M2 275,000 8,745,000
V Pekerjaan finishing 34.50 M2 100,000 3,450,000
44,615,000

Pondasi Vol Sat Harga


galian 2.375 3 M3 100,000 300,000
urug pasir 2.8 3 M3 350,000 1,050,000
besi 10 73 75 Btg 77,000 5,775,000
besi 6 38.425 40 Btg 50,000 2,000,000
beton site mix K225 8.5 8.5 M3 1,200,000 10,200,000
tenaga 17500000 18 Rp
Begisting 17 17 M2 150,000 2,550,000
wiremash 6 3.4 4 Lmb 370,000 1,480,000
Pekerjaan finishing 31.5 32 M2 100,000 3,200,000
kawat bendrat 18 18 kg 20,000 360,000
26,915,000
1
No : 07/III - PEN/ARJ/MRT-2021
Hal : Penawaran pembuatan pondasi outdoor AC

Kepada Yth :
Pimpinan P.T. Arya Jaya
Ditempat

Dengan Hormat,
Bersama dengan ini saya sampaikan penawaran untuk pekerjaan pembuatan base outdoor/pondasi
dudukan outdoor unit AC di RS. Cahya Kawaluyan dengan rincian sebagai berikut :

RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AHU POLIKLINIK


No Item Pekerjaan Jumlah
I Pekerjaan Persiapan 1.00 L.s 2,000,000 Rp2,000,000.00
Pembersihan area
Mobilisasi alat dan bahan
Peralatan pendukung
Perlengkapan K3
Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
I Pondasi
1 galian 1.10 M3 100,000 Rp200,000.00
2 urug pasir 2.00 M3 350,000 Rp700,000.00
II pondasi cakar ayam : 9.00 Bh 550,000 Rp4,950,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 30.00 M' 425,000 Rp12,750,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 24.00 M2 275,000 Rp6,600,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 26.00 M2 100,000 Rp2,600,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp27,800,000.00
Base Out Dor Unit AHU RADIOLOGI
I Pondasi
1 galian 0.75 M3 100,000 Rp75,000.00
2 urug pasir 0.60 M3 350,000 Rp210,000.00
II pondasi cakar ayam : 6.00 Bh 550,000 Rp3,300,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 13.60 M2 425,000 Rp5,780,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 6.00 M2 275,000 Rp1,650,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 7.00 M2 100,000 Rp700,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp11,715,000.00
Base Out Dor Unit AHU RM
I Pondasi
1 galian 0.50 M3 100,000 Rp50,000.00
2 urug pasir 0.20 M3 350,000 Rp70,000.00
II pondasi cakar ayam : 4.00 550,000 Rp2,200,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 5.40 M2 425,000 Rp2,295,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 1.80 M2 275,000 Rp495,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 1.50 M2 100,000 Rp150,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp5,260,000.00
JUMLAH Rp46,775,000.00
Demikian surat penawaran ini saya sampaikan atas perhatian dan kerjasamanya saya ucapkan terimakasih.

Bandung, 8 Maret 2021

Suyanto
( hp. 085315194822)
* Penawaran berlaku 2 minggu terhitung sejak tanggal penawaran. penawaran dapat beruabah mengikuti harga pasar
* Pembayaran :
a. DP. 50%
b. 50 % (pelunasan setelah pekerjaan selesai)
* Harga belum termasuk Ppn 10%
No : 07/III - PEN/ARJ/MRT-2021
Hal : Penawaran pembuatan pondasi outdoor AC

Kepada Yth :
Pimpinan P.T. Arya Jaya
Ditempat

Dengan Hormat,
Bersama dengan ini saya sampaikan penawaran untuk pekerjaan pembuatan base outdoor/pondasi
dudukan outdoor unit AC di RS. Cahya Kawaluyan dengan rincian sebagai berikut :

RANCANA ANGGARAN BIAYA - PONDASI OUTDOR AC SAMPING AHU POLIKLINIK


No Item Pekerjaan Jumlah
I Pekerjaan Persiapan 1.00 L.s 2,000,000 Rp2,000,000.00
Pembersihan area
Mobilisasi alat dan bahan
Peralatan pendukung
Perlengkapan K3
Base Out Dor Unit AHU 1-3, 2-4, 2-10 (samping poliklinik)
I Pondasi
1 galian 1.10 M3 100,000 Rp200,000.00
2 urug pasir 2.00 M3 350,000 Rp700,000.00
II pondasi cakar ayam : 9.00 Bh 550,000 Rp4,950,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 30.00 M' 425,000 Rp12,750,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 24.00 M2 275,000 Rp6,600,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 26.00 M2 100,000 Rp2,600,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp27,800,000.00
Base Out Dor Unit AHU RADIOLOGI
I Pondasi
1 galian 0.75 M3 100,000 Rp75,000.00
2 urug pasir 0.60 M3 350,000 Rp210,000.00
II pondasi cakar ayam : 6.00 Bh 550,000 Rp3,300,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 13.60 M2 425,000 Rp5,780,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 6.00 M2 275,000 Rp1,650,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 7.00 M2 100,000 Rp700,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp11,715,000.00
Base Out Dor Unit AHU RM
I Pondasi
1 galian 0.50 M3 100,000 Rp50,000.00
2 urug pasir 0.20 M3 350,000 Rp70,000.00
II pondasi cakar ayam : 4.00 550,000 Rp2,200,000.00
a. Base plate pondasi 0.5 x 0.5 x 0.5
b. Besi penulangan utama D 10
c. besi 6 untuk sengkang kolom
d. beton site mix K225
III Sloof 0.2 x 0.2 x 30 m 5.40 M2 425,000 Rp2,295,000.00
a. Tulangan/Besi utama 4D 10
b. Besi sengkang D6 - 150
c. beton site mix K225
d.Begisting
IV lantai 6 x 4 m 1.80 M2 275,000 Rp495,000.00
a. wiremash besi uk 6. mm
b. beton Site Mix K225 untuk lantai tebal 0.07 m
V Pekerjaan finishing 1.50 M2 100,000 Rp150,000.00
a. Finishing area balok dan lantai
b. acian
c. pembersihan area
total Rp5,260,000.00
JUMLAH Rp46,775,000.00

Demikian surat penawaran ini saya sampaikan atas perhatian dan kerjasamanya saya ucapkan terimakasih.

Bandung, 8 Maret 2021

Suyanto
( hp. 085315194822)
* Penawaran berlaku 2 minggu terhitung sejak tanggal penawaran. penawaran dapat beruabah mengikuti harga pasar
* Pembayaran :
a. DP. 50%
b. 50 % (pelunasan setelah pekerjaan selesai)
* Harga belum termasuk Ppn 10%

Rp44,775,000.00