KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PENGAWASAN (SUPERVISI) PEMBANGUNAN GEDUNG RUMAH SAKIT KORPRI DI SAMARINDA
NO. KONTRAK : 602/821/CK-VI/2021 NO. KONTRAK ADD. : 602/1917.e/SPV/ADD-02/CK-XII/2021
NILAI KONTRAK : Rp. 805,502,500.00 NILAI KONTRAK ADD. : Rp. 648,532,500.00
LOKASI : KOTA SAMARINDA
SUMBER DANA : APBD PROVINSI KALTIM
T.A : 2021
PERIODE PELAKSANAAN
No Kontrak : 602/1228.a/CK-VIII/2021
Tgl. Kontrak : 26 Agustus 2021 PERIODE : 3 (tiga)
Nilai Kontrak : Rp. 43,321,221,000.00 START FINISH DURASI MINGGU KE : 11 Err:511
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp) VOLUME VOLUME VOLUME
01 ADD N0. 01
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
1 Urugan Tanah m3 2,582.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2,582.50 Err:508 Err:508 2,582.50 Err:508 Err:508 %
- Urugan Tanah m3 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,276.36 Err:508 Err:508 1,276.36 Err:508 Err:508 %
2 Pekerjaan LPJU 100 w Solar Cell (Tiang 7m) Ttk 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN TANAH Err:508 Err:508 Err:508 Err:508 Err:508
X PEKERJAAN TAMAN
1 Tanah Humus/ Top soil m3 7.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
2 Gebalan Rumput m2 90.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
3 Pohon Tabebuya T. 1,5 m Phn 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Palm Putri T. 2m Phn 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508 Err:508 Err:508 Err:508 Err:508
B PENERAPAN SMKK
3.1 Penyiapan RKK
3.1.1 Pembuatan dokumen RKK Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.1.2 Pembuatan prosedur dan instruksi kerja, dan Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.1.3 Penyiapan formulir Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2 Sosialisasi, Promosi, dan Pelatihan
3.2.1 Induksi K3 (Safety Induction) Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.2.2 Pengarahan K3 (Safety Briefing) Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.2.3 Pertemuan mengenai keselamatan (Safety Meeting, Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
Safety Talk, dan Tool Box Meeting)
3.2.4 Pelatihan K3 Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.5 Sosialisasi HIV/AIDS Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.6 Simulasi K3 Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.7 Spanduk (Banner) Lb 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 4.00 Err:508 Err:508 4.00 Err:508 Err:508 %
3.2.8 Poster, dan Lb 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 4.00 Err:508 Err:508 4.00 Err:508 Err:508 %
3.2.9 Papan informasi K3 Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.3 Alat Pelindung Kerja dan Alat Pelindung Diri
3.3.1 APK (Alat Pelindung Kerja)
3.3.1.1 Jaring pengaman (Safety Net) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.2 Tali keselamatan (Life Line) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.3 Penahan jatuh (Safety Deck) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.4 Pagar pengaman (Guard Railling) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.5 Pembatas area (Restricted Area) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.6 Pelindung jatuh (Fall Arrester), dan Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
C PEKERJAAN STRUKTUR
C.1 PEKERJAAN STRUKTUR BAWAH
C.1.1 PEKERJAAN TANAH & URUGAN
1 Pek.Galian Tanah Biasa Sedalam 1 m
Galian Pondasi Pile Cap m³ 432.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 413.26 Err:508 Err:508 413.26 Err:508 Err:508 %
Galian Pasangan Pondasi Bt. Gunung m³ 329.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Galian Parit m³ 88.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Pengurugan Pasir
Urugan Pasir Bawah Pondasi Pile Cap T-10 cm m³ 48.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 50.66 Err:508 Err:508 50.66 Err:508 Err:508 %
Urugan Pasir Bawah Pasangan Pondasi Bt. Gunung T-10 cm m³ 22.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Urugan Pasir Bawah Parit T-10 cm m³ 18.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek.Lantai Kerja
Lantai Kerja Bawah Pondasi Pile Cap T-5 cm m³ 24.27 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 25.33 Err:508 Err:508 25.33 Err:508 Err:508 %
Lantai Kerja Bawah Parit Keliling Bangunan T-5 cm m³ 5.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek.Pembuatan Parit Keliling + Plesteran + Acian,1pc : 2pp T-15 cm m² 40.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Pembuatan Bak Kontrol Unit 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- -
C.1.2 PEKERJAAN SUB.STRUKTUR. - -
1 Pengadaan dan Pemancangan Spun Pile, Ø 40 m¹ 3,024.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 6,473.00 Err:508 Err:508 6,473.00 Err:508 Err:508 %
2 Pengadaan dan Pemancangan Spun Pile, Ø 30 m¹ 1,961.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 216.00 Err:508 Err:508 216.00 Err:508 Err:508 %
3 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m m¹ 150.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Cerucuk kayu 10/10. 4 m. Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Cerucuk ulin 8/8 p. 2m Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 1 m m¹ 185.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
5 Pengelasan Sambungan Tiang Pancang Ø 40 m¹ 38.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 342.72 Err:508 Err:508 342.72 Err:508 Err:508 %
6 Pengelasan Sambungan Tiang Pancang Ø 30 m¹ 13.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 8.46 Err:508 Err:508 8.46 Err:508 Err:508 %
7 Pemotongan Kepala Tiang Pancang Ttk 190.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 281.00 Err:508 Err:508 281.00 Err:508 Err:508 %
8 Pondasi Type A. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type A. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ 70.98 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 90.58 Err:508 Err:508 90.58 Err:508 Err:508 %
Bekisting Pondasi m² 109.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 109.20 Err:508 Err:508 109.20 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 30.16 Err:508 Err:508 30.16 Err:508 Err:508 %
Besi Beton Ulir Kg 16,334.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19,813.88 Err:508 Err:508 19,813.88 Err:508 Err:508 %
9 Pondasi Type B. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type B. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ 131.82 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 167.58 Err:508 Err:508 167.58 Err:508 Err:508 %
Bekisting Pondasi m² 202.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 202.80 Err:508 Err:508 202.80 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 55.01 Err:508 Err:508 55.01 Err:508 Err:508 %
Besi Beton Ulir Kg 30,335.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 38,724.43 Err:508 Err:508 38,724.43 Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
10 Pondasi Type C. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type C.
Beton K.300 m³ 15.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Pondasi m² 40.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg 9,334.11 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
11 Pondasi Type D. 2200 x 2200 x 750 cm
Beton K.300 m³ 58.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Pondasi m² 105.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 14,322.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
12 Pondasi Type E. 800 x 800 x 500 cm
- Pondasi Type E. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ 5.44 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.88 Err:508 Err:508 2.88 Err:508 Err:508 %
Bekisting Pondasi m² 27.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 14.40 Err:508 Err:508 14.40 Err:508 Err:508 %
Besi Beton Ulir Kg 2,038.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 671.12 Err:508 Err:508 671.12 Err:508 Err:508 %
13 Pondasi Type E. 800 x 800 x 500 cm
Beton K.300 m³ 6.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Pondasi m² 21.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 705.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pondasi Type E1. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek. Pasangan Pondasi Bt. Gunung Camp. 1sp : 4pp m³ 143.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek. Pasangan Batu Kosong (Anstamping) m³ 45.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL (C1) PEKERJAAN STRUKTUR BAWAH Err:508 Err:508 Err:508 Err:508 Err:508
C.2 PEKERJAAN STRUKTUR ATAS.
C.2.1 PEKERJAAN LANTAI. 1
1 Pek.Kolom Pedestal.500 x 500.
Beton K.300 m³ 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 14.42 Err:508 Err:508 14.42 Err:508 Err:508 %
Bekisting Kolom m² 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 115.36 Err:508 Err:508 115.36 Err:508 Err:508 %
Besi Beton Polos Kg 1,049.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 798.24 Err:508 Err:508 798.24 Err:508 Err:508 %
Besi Beton Ulir Kg 1,926.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,497.20 Err:508 Err:508 3,497.20 Err:508 Err:508 %
2 Pek.Kolom Pedestal.400 x 600.
Beton K.300 m³ 6.12 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.07 Err:508 Err:508 2.07 Err:508 Err:508 %
Bekisting Kolom m² 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 17.28 Err:508 Err:508 17.28 Err:508 Err:508 %
Besi Beton Polos Kg 451.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 114.03 Err:508 Err:508 114.03 Err:508 Err:508 %
Besi Beton Ulir Kg 818.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 499.60 Err:508 Err:508 499.60 Err:508 Err:508 %
3 Pek.Kolom Pedestal.400 x 400.
Beton K.300 m³ 3.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 38.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 334.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 834.91 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Kolom Pedestal 200 x 300
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
5 Pek.Kolom Pedestal.250 x 250.
Beton K.300 m³ 1.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 0.65 Err:508 Err:508 0.65 Err:508 Err:508 %
Bekisting Kolom m² 28.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 10.35 Err:508 Err:508 10.35 Err:508 Err:508 %
Besi Beton Polos Kg 246.95 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 51.89 Err:508 Err:508 51.89 Err:508 Err:508 %
Besi Beton Ulir Kg 468.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 182.24 Err:508 Err:508 182.24 Err:508 Err:508 %
6 Pek,Balok Suspended f S1.300 x 600.
Beton K.300 m³ 63.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 20.68 Err:508 15.52 Err:508 36.20 Err:508 Err:508 %
Bekisting Balok m² 525.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 183.84 Err:508 267.88 Err:508 451.72 Err:508 Err:508 %
Besi Beton Polos Kg 3,678.56 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,491.84 Err:508 2,186.72 Err:508 3,678.56 Err:508 Err:508 %
Besi Beton Ulir Kg 9,659.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,575.60 Err:508 5,363.40 Err:508 8,939.00 Err:508 Err:508 %
7 Pek,Balok Suspended S2.300 x 500.
Beton K.300 m³ 35.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 10.80 Err:508 8.09 Err:508 18.89 Err:508 Err:508 %
Bekisting Balok m² 44.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 102.80 Err:508 107.94 Err:508 210.74 Err:508 Err:508 %
Besi Beton Polos Kg 2,210.98 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 874.56 Err:508 918.30 Err:508 1,792.86 Err:508 Err:508 %
Besi Beton Ulir Kg 4,586.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,688.47 Err:508 1,772.89 Err:508 3,461.36 Err:508 Err:508 %
8 Pek,Balok Suspended S3.250 x 400.
Beton K.300 m³ 48.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 12.98 Err:508 9.73 Err:508 22.71 Err:508 Err:508 %
Bekisting Balok m² 505.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 155.70 Err:508 233.55 Err:508 389.25 Err:508 Err:508 %
Besi Beton Polos Kg 3,650.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,381.65 Err:508 2,072.48 Err:508 3,454.13 Err:508 Err:508 %
Besi Beton Ulir Kg 8,407.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,065.09 Err:508 4,597.63 Err:508 7,662.72 Err:508 Err:508 %
9 Pek,Balok Suspended S4.200 x 350.
Beton K.300 m³ 22.73 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.76 Err:508 4.32 Err:508 10.08 Err:508 Err:508 %
Bekisting Balok m² 292.27 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 125.66 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Polos Kg 2,073.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 781.03 Err:508 1,171.54 Err:508 1,952.57 Err:508 Err:508 %
Besi Beton Ulir Kg 4,437.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,672.89 Err:508 2,509.34 Err:508 4,182.23 Err:508 Err:508 %
10 Pek,Balok Suspended S5.150 x 200.
Beton K.300 m³ 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 0.82 Err:508 0.61 Err:508 1.43 Err:508 Err:508 %
Bekisting Balok m² 7.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 27.17 Err:508 40.76 Err:508 67.93 Err:508 Err:508 %
Besi Beton Polos Kg 98.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 406.59 Err:508 609.88 Err:508 1,016.47 Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 320.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 189.12 Err:508 189.12 Err:508 Err:508 %
Besi Beton Polos Kg 5,137.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 1,095.38 Err:508 1,095.38 Err:508 Err:508 %
Besi Beton Ulir Kg 1,917.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 3,429.94 Err:508 3,429.94 Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ 7.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,027.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 378.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 10.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 2,226.43 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 605.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ 4.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 76.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 440.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,248.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Kolom K4.250 x 250 Rump.
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 13.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 494.56 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 4,421.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek.Balok B5.200 x 300. Bordes Tangga )
Pek.Balok B5.200 x 300. Bordes Tangga & Ramp )
Beton K.300 m³ 0.36 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 4.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 34.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 59.23 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
17 Pek.Balok Latai.110 x 110.
Beton K.100 m³ 0.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 16.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 300.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek.Plat Lantai T-15 cm
Beton K.300 m³ 257.15 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 104.32 Err:508 117.36 Err:508 221.69 Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 1,714.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 695.50 Err:508 1,043.24 Err:508 1,738.74 Err:508 Err:508 %
Besi Beton Polos Kg 34,147.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 11,471.73 Err:508 17,207.59 Err:508 28,679.32 Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
19 Pek.Plat Rump T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ 11.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 94.33 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat Ramp m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,163.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
20 Pek.Plat Tangga T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ 2.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 52.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 519.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
21 Pek.Rabat Keliling Bangunan T-10 cm
Beton K.175 m³ 11.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat m² 238.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 2,785.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
22 Pek.Ruangan Pit Lift
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
23 Pasang Konstruksi Baja WF 200.100.5,5.8 Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
24 Proteksi Anti Karat / Rust proof pada rangka baja m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
25 Pek. Screeding tebal 3 cm Untuk Pit Lift m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
26 Pek. waterproofing (Coating) Pit Lift m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
C.2.2 PEKERJAAN LANTAI. 2
1 Pek.Balok B1.300 x 500.
Beton K.300 m³ 50.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 438.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 3,143.89 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 9,287.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ 0.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 1.76 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 13.77 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 46.51 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 1.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Balok m² 11.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 109.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 178.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Balok B2.250 x 500.
Beton K.300 m³ 29.63 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 296.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,072.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,897.51 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B2.250 x 500. R. Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ 1.90 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 19.96 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 144.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 473.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek.Balok B3.250 x 400.
Beton K.300 m³ 25.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 262.74 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,896.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 4,368.01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek.Balok B4.200 x 400.
Beton K.300 m³ 14.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 180.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,259.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 2,471.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B4.200 x 400. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek.Balok B5.200 x 300.
Beton K.300 m³ 10.61 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 141.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,024.22 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,745.76 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B5.200 x 300. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek.Balok B6.150 x 200.
Beton K.300 m³ 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 7.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 98.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek.Balok Latai, 110 x 110.
Beton K.100 m³ 1.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 27.61 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 493.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 320.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,917.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,137.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ 7.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 378.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,027.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 10.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 605.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 2,226.43 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ 0.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 69.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 197.18 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Kolom K4.250 x 250. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 11.23 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 408.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 3,650.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek.Plat Lantai T-12 cm
Beton K.300 m³ 192.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 1,602.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 36,742.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
- Pek.Plat Lantai T-12 cm R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
Bekisting Plat Lantai (Bondeks) m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
17 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 1.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai m² 196.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 460.19 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek.Plat Rump T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ 11.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 94.33 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,163.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
19 Pek.Plat Tangga T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ 2.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 52.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 519.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
IX PEK. PENGECATAN
1 Pek. Cat Dinding Tembok Luar m² 943.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Cat Dinding Tembok Dalam m² 641.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Cat Dinding Gypsum m² 1,184.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Cat Daun Pintu Bengkirai m² 22.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek. Cat Dinding Epoxy m² 641.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Cat Plafond m² 4,266.62 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PENGECATAN Err:508 Err:508 Err:508 Err:508 Err:508
X PEK. SANITASI
1 Pek. Pasangan Wastafel Lengkap Set 96.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Pasangan Urinoir Set 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Pasangan Closet Duduk Set 63.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Pasangan Closet Jongkok set 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pasangan Kran Tembok Unit 96.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pasangn Jet Washer Unit 77.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pasangn Hand Shower Unit 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Floor Drain bh 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. SANITASI Err:508 Err:508 Err:508 Err:508 Err:508
XI PEKERJAAN LAINYA
1 Pek. Railling Tangga Umum terpasang m' 13.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Hand Railling Koridor m' 126.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Railling Teras Luar terpasang m' 86.87 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Pas. Sunblas Kaca m² 2.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pas.Grab Bar Toilet Disable Bh 34.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pas. Scrub Up R. OK 2 Person Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pas. Spoel Hoek Bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pas. Pekerjaan Tangga Darurat Rangka Baja Set 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek. Tulisan "Rumah Sakit Korpri" bh 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN LAINYA Err:508 Err:508 Err:508 Err:508 Err:508
- Kabel Tray W 300 mm , H 50 mm m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Grounding lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LAMPU DAN ACCESSORIES
- LED PANEL SPARC 30120 32w/865 bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh - Err:508 Err:508 Err:508 Err:508
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh 33.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA G2 114 LED 7W/CW bh 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LEDBULB 10W E27 6500K 230V INDO bh - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
- Exit Lamp LED 3 Watt bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Double bh 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 86.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 3 Err:508 Err:508 Err:508 Err:508 Err:508
3 RUANG GENSET
- MCB BOX 6 GROUP set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal : 2,0 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa co: RAL 7032 ttk 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa c : Powder Coating ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL RUANG GENSET Err:508 Err:508 Err:508 Err:508 Err:508
4 RUANG POMPA
- MCB BOX 4 GROUP set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL RUANG POMPA Err:508 Err:508 Err:508 Err:508 Err:508
G PEKERJAAN CCTV
MAIN UNIT
1 Network Video Recorder type DRN-5532-400N00 unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 TV / Monitor 32 Inc unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 PoE Gigabyte 24 Port unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Equitment Rack 12 U Indorack IR8012G unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 1
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 3 Err:508 Err:508 Err:508 Err:508 Err:508
H PEKERJAAN TELEPHONE
MAIN UNIT
1 Pabx Panasonic NS 300 6 Line 80 Extension Analog set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 MDF + Surge Arester set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Batery Back Up 2200 VA set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Kabel Fider
4 - Dari TB Lt 1 ke TB Lt 2 kabel ITC 10 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 - Dari TB Lt 2 ke TB Lt 3 kabel ITC 20 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 - Dari TB Lt 3 ke TB Lt 4 kabel ITC 30 pair include pipa conduit m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 - Dari TB Lt 4 ke TB Lt 5 kabel ITC 30 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 - Dari TB Lt 5 ke TB Lt 6 kabel ITC 20 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 1
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 29.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 44.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 55.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 3 Err:508 Err:508 Err:508 Err:508 Err:508
K PEKERJAAN CABLE TV
LANTAI 1
- Outlet TV bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
- Outlet TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
- Outlet TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 3 Err:508 Err:508 Err:508 Err:508 Err:508
L PEKERJAAN LAN
LANTAI 1
1 Outlet LAN RJ 45 bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 6 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Outlet LAN RJ 45 bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 24 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Outlet LAN RJ 45 bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 24 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 3 Err:508 Err:508 Err:508 Err:508 Err:508
2 Pompa Elektrik Fire Pump - nfpa 20 Non Listed unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Model : 100-80 fscj
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Complete with :
- Electric Motor ( fatory choice ), 75 kW / 3 x 380 V / 50 Hz / 3 P 2.900 rpm.
- Panel controller Y Delta open transition, NFPA- 20 Non Listed.
- Base Plate coupling and guard.
3 Pompa Jockey Pump ( JFP ) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Model : CRS-20, Groudpos Pump.
Kapasitas : 75 GPM
Head : 100 m.
Type : Vertical Multi Stage.
Power : 7,5 kW/380V/50Hz/3ph/2900 rpm.
Accessories : Suction & Discharge gauge.
Jockey Pump controller NFPA-20 Non Listed
8 Flexible Joint
- Flexible Joint dia 50 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 65 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 80 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Butterfly Valve
- Batterflay Valve dia 100 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Batterflay Valve dia 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Batterflay Valve dia 65 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Floater valve I/D pilot control dia 65 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 80 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 15 mm bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pressure Reducing Valve (PRV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Premming Tank 250 ltr bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Sefety Valve dia.100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Safety valve dia.20 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Alarm Gong bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA Err:508 Err:508 Err:508 Err:508 Err:508
b PEKERJAAN INSTALASI FIRE HYDRANT
1 SITE PLAN
Pemipaan
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 150 mm (sprinkler dari ruang pompa ke gedung m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 100 mm (sprinkler dari ruang pompa ke gedung m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 100 mm hydrant kawasan m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Hydrant Pilar (HP) bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Outdoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Hose Reel Cabinet (HRC) bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Siamese Conection (SC) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Check Valve : 100 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Galian Pipa + Timbunan kembali dengan kedalaman 60 cm. m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT SITE PLAN Err:508 Err:508 Err:508 Err:508 Err:508
2 LANTAI 1
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 100 mm m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 80 mm m' 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 125.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.1 Err:508 Err:508 Err:508 Err:508 Err:508
3 LANTAI - 2
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm M' 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 95.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.2 Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
4 LANTAI - 3
Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm M' 26.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 75.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.3 Err:508 Err:508 Err:508 Err:508 Err:508
O PEKERJAAN GAS MEDIS
PERALATAN UTAMA GAS MEDIS
1 Sentral Oksigen Kapasitas 2x10 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Automatic
terdiri dari :
- Full digital automatic change over device
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder
2 Sentral N20 Kapasitas 2x2 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Manual
terdiri dari :
- Regulator
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder
3 Sentral Compress Air set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Duplex System
terdiri dari :
- Compressor kapasitas 405 l/m; 3 ph Hitachi, OILESS Copressor
- Compressor Tank (vol.50 ltr) - lokal
- Air Dryer
- Pre Filter
- After Filter
- Control Panel-Panel
- Instalasi Pipa sentral Compressor Air
- Regulator Compressore Air- Low Pressure, single Stage SMC
- Compressore switch
4 Sentral Vacuum set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Vacuum Pump kapasitas 165 M3/H; 2,2 KW
- Vacuum Tank (volume 500 liter) Lokal
- Bacterial Filter
- Control Panel Lokal
- Support & Consumeble material
- Vacuum Switch
5 Arlarm type IV gas bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pemipaan Vacuum
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 5/8" m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Ball Valve 3/4" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Ball Valve 1 1/4" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Ball Valve 1 1/2" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA GAS MEDIS Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
Pekerjaan Insatalasi Gas medis pipa tembaga medis ASTM B-819 termasuk support dan materian bantu
1 Pemipaan gas Oksigen
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 60.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Bedhead bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Ball Valve 3/4" bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL GAS MEDIS LT.3 Err:508 Err:508 Err:508 Err:508 Err:508
Lantai 2 :
1 Master Station, 20-call NIM-20B.E. bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Corridor light NIR-4.E. bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Call reset button NIR-2.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh 27.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Lantai 3 :
1 Master Station, 20-call NIM-20B.E. bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Corridor light NIR-4.E. bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Call reset button NIR-2.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh 27.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508 Err:508 Err:508 Err:508 Err:508
2 Pengadaan Transfer Pump Effluent unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Submersible
Kapasitas : 1,45 m3/jam
Head : 10 m
Max Solid Size : 45 mm
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
3 Pengadaan RAS Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,75 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
4 Pengadaan Mixing Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2,1 m3/jam
Head : 15 m
Power EM : 1,5 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
Asssesoris : Injektor
5 Pengadaan Filter Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,37 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
b Pekerjaan Tanki Equalisasi unit 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Pengadaan Corse Buble Diffuser
Diameter : 4 "
Material : ABS
Conection : 3/4 "
Ukuran Bubble : lebih besar dari 4mm
2 Pengadaan Pressured Air Piping Installasi ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa PVC 3/4" yang masuk ke air
- Gate valve 3/4"
- Panjang pipa dan jumlah aksesoris menyesuaikan kebutuhan di lapangan
3 Pengadaan Pressured Air Piping Installasi ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Pipa Sch 20 diameter 4" untuk cabang - cabang
- Pipa Sch 20 diameter 6 " untuk Header
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa Stainless Steell SUS 304 Sch 10dia. 2 " dan PVC yang masuk ke air
4 Chlorinasi sistem unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Panel Control unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
JOSZY ARIEF M, ST
Team Leader
KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH SAKIT KORPRI DI SAMARINDA
LOKASI : SAMARINDA
TAHUN PELAKSANAAN : 2021 KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS
MINGGU KE 4450400.0000%
PERIODE 0.0000%
RENCANA: 26.315%
REALISASI : Err:508
DEVIASI : Err:508
X PEKERJAAN TAMAN
1 Tanah Humus/ Top soil m3 0.0000% 0.00 %
2 Gebalan Rumput m2 0.0000% 0.00 %
3 Pohon Tabebuya T. 1,5 m Phn Err:508 Err:508 %
4 Palm Putri T. 2m Phn 0.0000% 0.00 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508
B PENERAPAN SMKK
3.1 Penyiapan RKK
3.1.1 Pembuatan dokumen RKK Set Err:508 Err:508 %
3.1.2 Pembuatan prosedur dan instruksi kerja, dan Set Err:508 Err:508 %
3.1.3 Penyiapan formulir Set Err:508 Err:508 %
3.2 Sosialisasi, Promosi, dan Pelatihan
3.2.1 Induksi K3 (Safety Induction) Org Err:508 Err:508 %
3.2.2 Pengarahan K3 (Safety Briefing) Org Err:508 Err:508 %
3.2.3 Pertemuan mengenai keselamatan (Safety Meeting, Org Err:508 Err:508 %
Safety Talk, dan Tool Box Meeting)
3.2.4 Pelatihan K3 Org Err:508 Err:508 %
3.2.5 Sosialisasi HIV/AIDS Org Err:508 Err:508 %
3.2.6 Simulasi K3 Org Err:508 Err:508 %
3.2.7 Spanduk (Banner) Lb Err:508 Err:508 %
3.2.8 Poster, dan Lb Err:508 Err:508 %
3.2.9 Papan informasi K3 Bh Err:508 Err:508 %
3.3 Alat Pelindung Kerja dan Alat Pelindung Diri
3.3.1 APK (Alat Pelindung Kerja)
3.3.1.1 Jaring pengaman (Safety Net) Ls Err:508 Err:508 %
3.3.1.2 Tali keselamatan (Life Line) Ls Err:508 Err:508 %
3.3.1.3 Penahan jatuh (Safety Deck) Ls Err:508 Err:508 %
3.3.1.4 Pagar pengaman (Guard Railling) Ls Err:508 Err:508 %
3.3.1.5 Pembatas area (Restricted Area) Ls Err:508 Err:508 %
3.3.1.6 Pelindung jatuh (Fall Arrester), dan Bh Err:508 Err:508 %
C PEKERJAAN STRUKTUR
C.1 PEKERJAAN STRUKTUR BAWAH
C.1.1 PEKERJAAN TANAH & URUGAN
1 Pek.Galian Tanah Biasa Sedalam 1 m
Galian Pondasi Pile Cap m³ Err:508 Err:508 %
Galian Pasangan Pondasi Bt. Gunung m³ Err:508 Err:508 %
Galian Parit m³ Err:508 Err:508 %
REALISASI MINGGU INI BOBOT
IX PEK. PENGECATAN
1 Pek. Cat Dinding Tembok Luar m² Err:508 Err:508 %
2 Pek. Cat Dinding Tembok Dalam m² Err:508 Err:508 %
3 Pek. Cat Dinding Gypsum m² Err:508 Err:508 %
4 Pek. Cat Daun Pintu Bengkirai m² Err:508 Err:508 %
5 Pek. Cat Dinding Epoxy m² Err:508 Err:508 %
6 Pek. Cat Plafond m² Err:508 Err:508 %
SUB TOTAL PEK. PENGECATAN Err:508
X PEK. SANITASI
1 Pek. Pasangan Wastafel Lengkap Set Err:508 Err:508 %
2 Pek. Pasangan Urinoir Set Err:508 Err:508 %
3 Pek. Pasangan Closet Duduk Set Err:508 Err:508 %
4 Pek. Pasangan Closet Jongkok set Err:508 Err:508 %
5 Pasangan Kran Tembok Unit Err:508 Err:508 %
6 Pasangn Jet Washer Unit Err:508 Err:508 %
7 Pasangn Hand Shower Unit Err:508 Err:508 %
8 Floor Drain bh Err:508 Err:508 %
SUB TOTAL PEK. SANITASI Err:508
XI PEKERJAAN LAINYA
1 Pek. Railling Tangga Umum terpasang m' Err:508 Err:508 %
2 Pek. Hand Railling Koridor m' Err:508 Err:508 %
3 Pek. Railling Teras Luar terpasang m' Err:508 Err:508 %
4 Pek. Pas. Sunblas Kaca m² Err:508 Err:508 %
5 Pas.Grab Bar Toilet Disable Bh Err:508 Err:508 %
6 Pas. Scrub Up R. OK 2 Person Bh Err:508 Err:508 %
REALISASI MINGGU INI BOBOT
G PEKERJAAN CCTV
MAIN UNIT
1 Network Video Recorder type DRN-5532-400N00 unit Err:508 Err:508 %
2 TV / Monitor 32 Inc unit Err:508 Err:508 %
3 PoE Gigabyte 24 Port unit Err:508 Err:508 %
4 Equitment Rack 12 U Indorack IR8012G unit Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508
LANTAI 1
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 1 Err:508
LANTAI 2
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 2 Err:508
LANTAI 3
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 3 Err:508
H PEKERJAAN TELEPHONE
MAIN UNIT
1 Pabx Panasonic NS 300 6 Line 80 Extension Analog set Err:508 Err:508 %
2 MDF + Surge Arester set Err:508 Err:508 %
3 Batery Back Up 2200 VA set Err:508 Err:508 %
Kabel Fider
4 - Dari TB Lt 1 ke TB Lt 2 kabel ITC 10 pair include pipa conduit m' Err:508 Err:508 %
5 - Dari TB Lt 2 ke TB Lt 3 kabel ITC 20 pair include pipa conduit m' Err:508 Err:508 %
6 - Dari TB Lt 3 ke TB Lt 4 kabel ITC 30 pair include pipa conduit m' Err:508 Err:508 %
7 - Dari TB Lt 4 ke TB Lt 5 kabel ITC 30 pair include pipa conduit m' Err:508 Err:508 %
8 - Dari TB Lt 5 ke TB Lt 6 kabel ITC 20 pair include pipa conduit m' Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508
LANTAI 1
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 1 Err:508
LANTAI 2
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 2 Err:508
LANTAI 3
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 3 Err:508
REALISASI MINGGU INI BOBOT
K PEKERJAAN CABLE TV
LANTAI 1
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 1 Err:508
LANTAI 2
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 2 Err:508
LANTAI 3
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 3 Err:508
L PEKERJAAN LAN
LANTAI 1
1 Outlet LAN RJ 45 bh Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
3 Switch HUB 6 port bh Err:508 Err:508 %
SUB TOTAL LAN LT 1 Err:508
LANTAI 2
1 Outlet LAN RJ 45 bh Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
3 Switch HUB 24 port bh Err:508 Err:508 %
SUB TOTAL LAN LT 2 Err:508
REALISASI MINGGU INI BOBOT
2 Pompa Elektrik Fire Pump - nfpa 20 Non Listed unit Err:508 Err:508 %
Model : 100-80 fscj
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Complete with :
- Electric Motor ( fatory choice ), 75 kW / 3 x 380 V / 50 Hz / 3 P 2.900 rpm.
- Panel controller Y Delta open transition, NFPA- 20 Non Listed.
- Base Plate coupling and guard.
8 Flexible Joint
- Flexible Joint dia 50 mm bh Err:508 Err:508 %
- Flexible Joint dia 65 mm bh Err:508 Err:508 %
- Flexible Joint dia 80 mm bh Err:508 Err:508 %
- Flexible Joint dia 100 mm bh Err:508 Err:508 %
9 Butterfly Valve
- Batterflay Valve dia 100 mm bh Err:508 Err:508 %
- Batterflay Valve dia 80 mm bh Err:508 Err:508 %
- Batterflay Valve dia 65 mm bh Err:508 Err:508 %
9 Pemipaan Vacuum
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' Err:508 Err:508 %
Lantai 2 :
1 Master Station, 20-call NIM-20B.E. bh Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh Err:508 Err:508 %
3 Corridor light NIR-4.E. bh Err:508 Err:508 %
4 Call reset button NIR-2.E bh Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
Lantai 3 :
1 Master Station, 20-call NIM-20B.E. bh Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh Err:508 Err:508 %
3 Corridor light NIR-4.E. bh Err:508 Err:508 %
4 Call reset button NIR-2.E bh Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508
TOTAL Err:508
REKAPITULASI
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011
TERBILANG : Satu Milyar Enam Ratus Lima Belas Juta Empat Ratus Tiga Puluh Ribu Rupiah
ACHMAD BARKATI
Direktur
RENCANA ANGGARAN BIAYA ( RAB )
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.)
(Rp.)
A PEKERJAAN PERSIAPAN
1 Pagar Proyek m' 129.82 279,950.00 36,343,109.00
2 Barak kerja Ls 1.00 15,000,000.00 15,000,000.00
3 Pengukuran dan Pemasangan Bouwplank m' 120.10 50,900.00 6,113,090.00
4 Bongkar Bangunan Existing termasuk pembersihan Ls 1.00 12,500,000.00 12,500,000.00
5 Mobilisasi dan Demobilisasi Ls 1.00 6,500,000.00 6,500,000.00
0 0.00
Subtotal A 76,456,199.00
0 0.00
B PEKERJAAN TANAH 0.00
1 Galian Tanah Pile cap & Sloof m3 131.87 28,000.00 3,692,360.00
2 Urugan Pasir Bawah Pile cap dan Sloof m3 9.47 145,000.00 1,372,570.00
3 Urugan Pasir Bawah Lantai m3 57.85 145,000.00 8,387,670.00
4 Lantai Kerja bawah Pile Cap dan Sloof m2 94.58 97,980.00 9,266,948.40
5 Lantai Kerja bawah Lantai m2 578.46 97,980.00 56,677,510.80
6 Urugan Tanah Kembali m3 97.55 13,420.00 1,309,121.00
7 Urugan Tanah Peninggian Lantai m3 289.23 68,380.00 19,777,547.40
Subtotal B 100,483,727.60
0.00
C PEKERJAAN STRUKTUR 0.00
1 Pekerjaan Tiang Pancang
a. Pengadaan Tiang Pancang 25x25 cm L=24 M m' 2,856.00 200,000.00 571,200,000.00
b. Pemancangan Tiang Pancang 25x25 cm L=24M m' 2,856.00 38,500.00 109,956,000.00
c. Sambungan Tiang Pancang 25x25 cm titik 336.00 35,000.00 11,760,000.00
d. Potong Tiang Pancang 25x25 cm titik 112.00 55,000.00 6,160,000.00
e. PDA Test titik 4.00 10,000,000.00 40,000,000.00
2 Pekerjaan Pondasi 0.00
a. Pile cap P1 0.00
(1). Besi U-40 kg 1,457.50 14,985.50 21,841,366.25
(2). Bekisting m2 35.88 121,390.00 4,355,473.20
(3). Beton ready mix K-250 m3 5.83 1,559,500.00 9,091,885.00
b. Pile cap P2 0.00
(1). Besi U-40 kg 1,345.00 14,985.50 20,155,497.50
(2). Bekisting m2 25.95 121,390.00 3,150,070.50
(3). Beton ready mix K-250 m3 5.38 1,559,500.00 8,390,110.00
c. Pile cap P3 0.00
(1). Besi U-40 kg 1,332.50 14,985.50 19,968,178.75
(2). Bekisting m2 35.52 121,390.00 4,311,772.80
(3). Beton ready mix K-250 m3 5.33 1,559,500.00 8,312,135.00
d. Pile cap P4 0.00
(1). Besi U-40 kg 2,380.00 14,985.50 35,665,490.00
(2). Bekisting m2 35.88 121,390.00 4,355,473.20
(3). Beton ready mix K-250 m3 9.52 1,559,500.00 14,846,440.00
e. Sloof S1-15/30 0.00
(1). Besi U-40 kg 3,286.48 14,985.50 49,249,593.99
(2). Besi U-24 kg 609.04 14,460.50 8,807,022.34
(3). Bekisting m2 200.64 130,640.00 26,211,609.60
(4). Beton ready mix K-250 m3 15.05 1,559,500.00 23,467,356.00
f. Sloof S2-25/40 0.00
(1). Besi U-40 kg 3,925.62 14,985.50 58,827,445.94
(2). Besi U-24 kg 932.49 14,460.50 13,484,339.32
(3). Bekisting m2 345.87 130,640.00 45,184,456.80
(4). Beton ready mix K-250 m3 32.94 1,559,500.00 51,369,930.00
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.)
(Rp.)
Subtotal C 1,291,640,023.09
ANALISA HARGA SATUAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011
A PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2 M m'
1.2000 Lbr Seng Gelombang - 45,000.00 54,000.00
0.4500 Kg Meni Besi - 12,500.00 5,625.00
0.0600 Kg Paku Seng - 17,500.00 1,050.00
0.0090 M3 Koral Beton - 175,000.00 1,575.00
0.0500 zak Semen Portland 50 Kg - 75,000.00 3,750.00
0.0050 M3 Pasir Beton - 150,000.00 750.00
0.0720 M3 Kayu 5/7 - 2,200,000.00 158,400.00
1.0000 Btg Kayu Dolken dia. 8-10/400 cm - 11,000.00 11,000.00
0.4000 OH Pekerja Biasa 60,000.00 - 24,000.00
0.2000 OH Tukang Kayu 80,000.00 - 16,000.00
0.0200 OH Kepala Tukang 90,000.00 - 1,800.00
0.0200 OH Mandor 100,000.00 - 2,000.00
- - 279,950.00
B PEKERJAAN TANAH
1 Galian Tanah Biasa sedalam 1 M m3
0.4000 OH Pekerja Biasa 60,000.00 - 24,000.00
0.0400 OH Mandor 100,000.00 - 4,000.00
- - 28,000.00
2 Urugan Kembali m3
0.1920 OH Pekerja Biasa 60,000.00 - 11,520.00
0.0190 OH Mandor 100,000.00 - 1,900.00
- - 13,420.00
4 Urugan Pasir m3
1.2000 M3 Pasir Urug (Mahakam) - 105,000.00 126,000.00
0.3000 OH Pekerja Biasa 60,000.00 - 18,000.00
0.0100 OH Mandor 100,000.00 - 1,000.00
- - 145,000.00
C PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Gunung Camp. 1 : 4 M3
1.1000 M3 Batu Belah 15/20 cm - - 175,000.00 192,500.00
3.2600 zak Semen @ 50 Kg - - 75,000.00 244,500.00
0.5200 M3 Pasir Pasang (Tenggarong) - - 110,000.00 57,200.00
1.5000 OH Pekerja Biasa - 60,000.00 - 90,000.00
0.6000 OH Tukang Batu - 80,000.00 - 48,000.00
0.0600 OH Kepala Tukang - 90,000.00 - 5,400.00
0.0750 OH Mandor - 100,000.00 - 7,500.00
- - 645,100.00
2 Membuat Beton Tumbuk Camp. 1 Pc : 3 Ps : 5 Kr M3
0.8700 M3 Koral Beton - - 175,000.00 152,250.00
4.3600 zak Semen Portland 50 Kg - - 75,000.00 327,000.00
0.5200 M3 Pasir Beton - - 150,000.00 78,000.00
1.6500 OH Pekerja Biasa - 60,000.00 - 99,000.00
0.2500 OH Tukang Batu - 80,000.00 - 20,000.00
0.0250 OH Kepala Tukang - 90,000.00 - 2,250.00
0.0800 OH Mandor - 100,000.00 - 8,000.00
- - 686,500.00
NO URAIAN SATUAN UPAH UNIT PRICE JUMLAH
- - 1,559,500.00
DAFTAR HARGA BAHAN DAN UPAH
HARGA SATUAN
NO UPAH / BAHAN / ALAT SATUAN
( Rp )
A UPAH
1 Pekerja OH 60,000.00
2 Tukang OH 80,000.00
3 Kepala Tukang OH 90,000.00
4 Mandor OH 100,000.00
B BAHAN
1 Tanah Urug Pilihan M3 45,800.00
2 Pasir Urug (Mahakam) M3 105,000.00
3 Pasir Pasang M3 110,000.00
4 Pasir beton cor M3 150,000.00
5 Koral beton M3 175,000.00
6 Batu Gunung M3 175,000.00
7 Batu Padas M3 110,000.00
8 Semen PC ( 50 Kg ) Zak 75,000.00
9 Besi Polos Kg 12,500.00
10 Besi ulir Kg 13,000.00
11 Kawat Bendrat Kg 17,500.00
12 Paku Biasa Kg 17,500.00
13 Paku Plywood Kg 17,500.00
14 Paku seng Kg 17,500.00
15 Seng BJLS 20 Lbr 45,000.00
16 Seng Plat 3' x 6' BJLS 28 Lbr 65,000.00
17 Beton readymix K-250 M3 1,290,000.00
18 Balok Meranti M3 2,200,000.00
19 Kayu Bekisting M3 1,850,000.00
20 Meni besi Ltr 12,500.00
21 plywood 9mm m2 105,000.00
22 Dolken Kayu Galam dia 8-10 / 4 m btg 11,000.00
23 Minyak Bekisting ltr 5,000.00
24 Tiang pancang 25x25x240cm btg 200,000.00
Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri ( TKDN )
% TKDN (Gabungan Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
=
Barang dan Jasa Nilai Gabungan Barang dan Jasa (9C)
ACHMAD BARKATI
Direktur
JADWAL WAKTU PELAKSANAAN
Kegiatan : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
Pekerjaan : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
Lokasi Jl. Harmonika, Samarinda
Tahun Anggaran 2011
(%) 1 2 3 4 5 6 7 8 9 10 11 12
C PEKERJAAN STRUKTUR 87.95 9.77 9.77 9.77 9.77 9.77 9.77 9.77 9.77 9.77
0
ACHMAD BARKATI
Direktur
BACK UP PROGRESS (MINGGU-I)
KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN 0
PERHITUNGAN
No KEGIATAN / SKETSA GAMBAR p x l x t x Jml VOLUME SAT. KETERANGAN
KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN NO. KONTRAK ADD.
PEKERJAAN : PEKERJAAN TANAH
PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x l x t x Jml
TOTAL 16.725 m3
PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x l x t x Jml
2 KP 2 1 x 1 x 0.05 x 3 0.15 m3
TOTAL 0.70 m3
KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
PEKERJAAN
PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x titik x Jml
AHMAD BARKATI
Direktur
KEGIATAN #REF!
PAKET PEKERJAAN 0
LOKASI #REF!
TAHUN ANGGARAN 0
A 0
1. 0 hr Err:508 Err:508 Err:508 100
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!
B #REF!
### #REF! hr #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF!
### #REF! hr #REF! #REF! #REF!
50
C 0
3.1 0 hr #REF! #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!
RENCANA
Total #REF! 0
Weekly Progress (%)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Komulatif Progress (%)
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Progress Actual (%)
(%)
Deviasi ( % )
Disetujui oleh : Disetujui oleh : Diperiksa oleh : Dibuat oleh :
Pelaksana Teknis Kegiatan Pengeloloa Keuangan Bantuan Hibah Konsultan Pengawas Kontraktor
Pembnagunan Gedung Legiun Veteran Republik Indonesia Kegiatan Pembangunan gedung CV.BIOLA TEKNIK CONSULTANT CV.HANDTER JAYA