REKAPITULASI LAPORAN MONITORING PROGRESS FISIK MINGGUAN

KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PENGAWASAN (SUPERVISI) PEMBANGUNAN GEDUNG RUMAH SAKIT KORPRI DI SAMARINDA
NO. KONTRAK : 602/821/CK-VI/2021 NO. KONTRAK ADD. : 602/1917.e/SPV/ADD-02/CK-XII/2021
NILAI KONTRAK : Rp. 805,502,500.00 NILAI KONTRAK ADD. : Rp. 648,532,500.00
LOKASI : KOTA SAMARINDA
SUMBER DANA : APBD PROVINSI KALTIM
T.A : 2021

PERIODE PELAKSANAAN
No Kontrak : 602/1228.a/CK-VIII/2021
Tgl. Kontrak : 26 Agustus 2021 PERIODE : 3 (tiga)
Nilai Kontrak : Rp. 43,321,221,000.00 START FINISH DURASI MINGGU KE : 11 Err:511

No Kontrak ADD-1 : 602/1337.a/CK-IX/2021 TANGGAL : 04/11/21 10/11/2021


Tgl. Kontrak ADD-1 : 14 September 2021
DINAS
Nilai Kontrak ADD-1 : Rp. 43,321,221,000.00

26-Aug-2021 31-Dec-2021 128 Hari


No Kontrak ADD-2 :
KONSULTAN
Tgl. Kontrak ADD-2 :
Nilai Kontrak ADD-2 :

PRESTASI PEKERJAAN BOBOT


JUMLAH
BOBOT REALISASI TERLAKSANA
NO JOB UNIT ( URAIAN PEKERJAAN ) (Rp) REALISASI REALISASI
(%) S/D
ADD N0. 01 MINGGU LALU MINGGU INI
MINGGU INI %

LINGKUP : PEKERJAAN SITE DEVELOPMENT

I PEKERJAAN TANAH Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %


II PEK. JALAN BETON Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
III PEK. PASANGAN PAVING BLOCK Err:508 Err:508 0.00% 0.00% 0.00% - %
IV PEK. DRAINASE AIR HUJAN SISI BANGUNAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
V PEK. TURAP / DINDING PENAHAN TANAH KELILING Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VI PEK. PAGAR KELILING Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VII PEK. JEMBATAN MASUK DAN KELUAR Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VIII PEKERJAAN BANGUNAN GENSET Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
IX PEKERJAAN RUANG ZENAZAH Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
X PEKERJAAN TAMAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
PRESTASI PEKERJAAN BOBOT
JUMLAH
BOBOT REALISASI TERLAKSANA
NO JOB UNIT ( URAIAN PEKERJAAN ) (Rp) REALISASI REALISASI
(%) S/D
ADD N0. 01 MINGGU LALU MINGGU INI
MINGGU INI %

LINGKUP : PEKERJAAN STRUKTUR


A PEKERJAAN PERSIAPAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
B PENERAPAN SMKK Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
C PEKERJAAN STRUKTUR Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %

LINGKUP PEKERJAAN : ARSITEKTUR

I PEKERJAAN PERSIAPAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %


II PEK. PASANGAN DINDING BATA Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
III PEK. PASANGAN DINDING KHUSUS Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
IV PEK. PASANGAN LANTAI Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
V PEK. KUSEN ALLUMUNIUM Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VI PEK. PINTU / JENDELA / VENTILASI Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VII PEK. PLAFOND Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
VIII PAS. KUNCI DAN ALAT PENGGANTUNG Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
IX PEK. PENGECATAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
X PEK. SANITASI Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
XI PEKERJAAN LAINYA Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %

LINGKUP PEKERJAAN : MEEP

A PEKERJAAN ELEKTRIKAL Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %


B PEKERJAAN TATA UDARA Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
C PEKERJAAN AIR BERSIH Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
D PEKERJAAN AIR KOTOR Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
E PEKERJAAN AIR BEKAS Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
F PEKERJAAN TATA SUARA Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
G PEKERJAAN CCTV Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
H PEKERJAAN TELEPHONE Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
I PEKERJAAN FIRE ALARM Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
J PEKERJAAN PENANGKAL PETIR Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
K PEKERJAAN CABLE TV Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
L PEKERJAAN LAN Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
M PEKERJAAN SISTEM ELEVATOR. Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
N PEKERJAAN HYDRANT & SPLINKLER Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
O PEKERJAAN GAS MEDIS Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
PRESTASI PEKERJAAN BOBOT
JUMLAH
BOBOT REALISASI TERLAKSANA
NO JOB UNIT ( URAIAN PEKERJAAN ) (Rp) REALISASI REALISASI
(%) S/D
ADD N0. 01 MINGGU LALU MINGGU INI
MINGGU INI %
P PEKERJAAN NURSE CALL AIPHONE Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Q PEKERJAAN INSTALASI PENGOLAHAN LIMBAH (IPAL) Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %

Err:508 Err:508 Err:508

(A) JUMLAH HARGA PEKERJAAN Err:508 RENCANA : 26.315 %


(B) PAJAK PERTAMBAHAN NILAN ( PPN ) = 10 % x ( A ) Err:508 Err:508 REALISASI : Err:508 %
(C) JUMLAH TOTAL HARGA PEKERJAAN Err:508 DEVIASI : Err:508 %

Samarinda, 10 November 2021


Disepakati Oleh : Dibuat Oleh :
Kontraktor Konsultan Pengawas
PT. TELAGA PASIR KUTA PT. GEOMAP INTERNATIONAL CONSULTANT

Ir. ERIK HERMANUS.E.R JOSZY ARIEF M, ST


Project Manager Team Leader

Diperiksa oleh : Diperiksa Oleh :


Pengadminitrasian Teknis Pengadminitrasian Teknis
DINAS PUPR & PERA PROV. KALTIM DINAS PUPR & PERA PROV. KALTIM

ZULFIKY OCTAVIANTO,ST ASMIN,ST


NIP. 19791031 200604 1 006 NIP. 19830704 201001 1 002
KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PENGAWASAN (SUPERVISI) PEMBANGUNAN GEDUNG RUMAH SAKIT KORPRI DI SAMARINDA
DINAS
NO. KONTRAK : 602/821/CK-VI/2021 NO. KONTRAK ADD. : 602/1917.e/SPV/ADD-02/CK-XII/2021
NILAI KONTRAK : Rp. 805,502,500.00 NILAI KONTRAK ADD. : Rp. 648,532,500.00
LOKASI : KOTA SAMARINDA
SUMBER DANA : APBD PROVINSI KALTIM
KONSULTAN
T.A : 2021

WAKTU PELAKSANAAN : 128 PERIODE : 3 Err:511


SELESAI KONTRAK : 31 Desember 2021 MINGGU KE : 11 Err:511 04 November 2021 10 November 2021
SISA WAKTU : 51
RENCANA : 26.315 %
REALISASI : Err:508 %
DEVIASI : Err:508 %

LAPORAN MONITORING MINGGUNAN

HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp) VOLUME VOLUME VOLUME
01 ADD N0. 01
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)

LINGKUP : PEKERJAAN SITE DEVELOPMENT


I PEKERJAAN TANAH

1 Urugan Tanah m3 2,582.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2,582.50 Err:508 Err:508 2,582.50 Err:508 Err:508 %
- Urugan Tanah m3 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,276.36 Err:508 Err:508 1,276.36 Err:508 Err:508 %
2 Pekerjaan LPJU 100 w Solar Cell (Tiang 7m) Ttk 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN TANAH Err:508 Err:508 Err:508 Err:508 Err:508

II PEK. JALAN BETON


1 Lantai Kerja m2 62.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Cor Jalan Beton K. 250 m3 186.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Besi tulangan Wire mesh M8 1 lapis Kg 9,928.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Bekisting m2 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Joint sealen/Aspal setiap jarak 4 m m 106.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. JALAN BETON Err:508 Err:508 Err:508 Err:508 Err:508

III PEK. PASANGAN PAVING BLOCK


1 Pek. Pasir Urug t. 10 cm m3 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
2 Paving block (incld pasir urug) m2 200.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
3 Kansteen m 240.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Cat kansteen m2 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
SUB TOTAL PEK. PASANGAN PAVING BLOCK Err:508 Err:508 0.0000% 0.0000% 0.0000%

IV PEK. DRAINASE AIR HUJAN SISI BANGUNAN


1 Pek. Galian Tanah m3 60.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Bak kontrol uk 50x50x60 cm + Tutup Bh 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pipa PVC type AW diameter 10 inchi m 240.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. DRAINASE AIR HUJAN SISI BANGUNAN Err:508 Err:508 Err:508 Err:508 Err:508

V PEK. TURAP / DINDING PENAHAN TANAH KELILING


1 Pas. Bowplank m 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 244.21 Err:508 Err:508 244.21 Err:508 Err:508 %
2 Pasangan Batu Gunung camp. 1:4 m3 129.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 104.22 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
- Pasangan Batu Gunung camp. 1:4 m3 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
3 Cerucuk kayu 10/10. 4 m. Ttk 160.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 129.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
- Cerucuk kayu 10/10. 4 m. Ttk Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
SUB TOTAL PEK. TURAP / DINDING PENAHAN TANAH KELILING Err:508 Err:508 Err:508 Err:508 Err:508

VI PEK. PAGAR KELILING


1 Galian Tanah m3 2.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 35.68 Err:508 35.68 Err:508 Err:508 %
2 Beton Pondasi Pagar uk 25x25x50 cm m3 1.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
- Beton Pondasi Pagar uk 25x25 cm m3 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
3 Pembesian kg 157.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 156.71 Err:508 1,614.41 Err:508 1,771.12 Err:508 Err:508 %
4 Bekisting Pondasi m2 42.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 41.79 Err:508 79.71 Err:508 121.50 Err:508 Err:508 %
5 Finishing Pondasi unit 42.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pagar BRC tinggi 190 (+ Tiang) m 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PAGAR KELILING Err:508 Err:508 Err:508 Err:508 Err:508

VII PEK. JEMBATAN MASUK DAN KELUAR


1 Galian Tanah m3 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
2 Urugan Pasir m3 1.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
3 Lantai Kerja m2 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Beton m3 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
5 Beton K.300 m3 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 15.00 Err:508 Err:508 15.00 Err:508 Err:508 %
5 Pembesian Kg 1,440.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
7 Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,840.17 Err:508 Err:508 3,840.17 Err:508 Err:508 %
6 Bekisting m2 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 60.00 Err:508 Err:508 60.00 Err:508 Err:508 %
SUB TOTAL PEK. JEMBATAN MASUK DAN KELUAR Err:508 Err:508 Err:508 Err:508 Err:508

VIII PEKERJAAN BANGUNAN GENSET


Pekerjaan Dasar
1 Lantai Kerja T=5cm m3 0.95 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Cor Rabat T=20 cm 1:2:3 m3 3.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Cerucuk ulin 8/8 p. 2m m1 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pekerjaan Ruang Genset
4 Kolom Besi Hollow 4x4 cm m1 50.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pagar Besi Hollow 2x4 cm (+ pintu) m2 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Atap Spandek (+ rangka besi hollow 4x4) m2 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN BANGUNAN GENSET Err:508 Err:508 Err:508 Err:508 Err:508

IX PEKERJAAN RUANG ZENAZAH


Pekerjaan Dasar
1 Lantai Kerja T=5cm m3 0.95 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Cor Rabat T=20 cm 1:2:3 m3 3.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Cerucuk ulin 8/8 p. 2m m1 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pekerjaan Ruang
4 Kolom Praktis m3 0.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Dinding Bata m2 72.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Ringbalk 8/12 m3 0.17 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek. Atap Spandek (+ rangka baja ringan) m2 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pas. Plafond Gypsum 9 mm + Rangka Hollow 4/4 cm m2 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek. Plesteran m2 144.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek. Acian m2 144.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pek. Pengecatan m2 176.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pas. Keramik Lantai m2 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pasangan Pintu Dobel unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Pas. Titik Lampu titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pas. Stop Kontak titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pas. Wastafel + pipa set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
17 Pas. Kran + pipa 1/2" set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pas. Floor Drain + pipa 3" set 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
19 Pas. Exaust Van set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
20 Pas. AC 1 PK set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508 Err:508 Err:508 Err:508 Err:508

X PEKERJAAN TAMAN
1 Tanah Humus/ Top soil m3 7.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
2 Gebalan Rumput m2 90.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
3 Pohon Tabebuya T. 1,5 m Phn 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Palm Putri T. 2m Phn 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508 Err:508 Err:508 Err:508 Err:508

LINGKUP : PEKERJAAN STRUKTUR


A PEKERJAAN PERSIAPAN
1. Pek. Pagar Sementara m2 224.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 132.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
2. Pek. Boring Titik 3.00 Err:508 Err:508 Err:508 Err:508 4,613,079.08 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
3. Pek. Pengukuran & Pemasangan Bouwplank m2 748.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Pek. Pengukuran & Pemasangan Bouwplank m Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 187.00 Err:508 Err:508 187.00 Err:508 Err:508 %
4. Pek.Test Pile Driving Analyzer ( PDA ) Titik 3.00 Err:508 Err:508 Err:508 Err:508 7,380,926.53 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
5. Mobilisasi dan Demobilisasi Alat Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
SUB TOTAL PEKERJAAN PERSIAPAN Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)

B PENERAPAN SMKK
3.1 Penyiapan RKK
3.1.1 Pembuatan dokumen RKK Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.1.2 Pembuatan prosedur dan instruksi kerja, dan Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.1.3 Penyiapan formulir Set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2 Sosialisasi, Promosi, dan Pelatihan
3.2.1 Induksi K3 (Safety Induction) Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.2.2 Pengarahan K3 (Safety Briefing) Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.2.3 Pertemuan mengenai keselamatan (Safety Meeting, Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
Safety Talk, dan Tool Box Meeting)
3.2.4 Pelatihan K3 Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.5 Sosialisasi HIV/AIDS Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.6 Simulasi K3 Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.2.7 Spanduk (Banner) Lb 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 4.00 Err:508 Err:508 4.00 Err:508 Err:508 %
3.2.8 Poster, dan Lb 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 4.00 Err:508 Err:508 4.00 Err:508 Err:508 %
3.2.9 Papan informasi K3 Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.3 Alat Pelindung Kerja dan Alat Pelindung Diri
3.3.1 APK (Alat Pelindung Kerja)
3.3.1.1 Jaring pengaman (Safety Net) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.2 Tali keselamatan (Life Line) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.3 Penahan jatuh (Safety Deck) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.4 Pagar pengaman (Guard Railling) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.5 Pembatas area (Restricted Area) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.1.6 Pelindung jatuh (Fall Arrester), dan Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

3.3.2 APD (Alat Pelindung Diri)


3.3.2.1 Helm pelindung (Safety Helmet) Bh 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.3.2.2 Pelindung mata (Goggles, Spectacles) Psg 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.2.3 Tameng muka (Face Shield) Bh 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.2.5 Pelindung Telinga (Ear Plug, Ear Muff) Psg 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.2.6 Pelindung pernafasan dan mulut (Masker) Bh 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.3.2.7 Sarung tangan (Safety Gloves) Psg 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.2.8 Sepatu keselamatan (Safety Shoes) Psg 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.3.2.9 Penunjang seluruh tubuh (Full Body Harness) Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.3.2.10 Rompi keselamatan (Safety Vest) Bh 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.3.2.11 Celemek (Apron/Coveralls) Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.4 Asuransi dan Perijinan
3.4.1 Asuransi Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.4.2 Surat Izin Laik Operasi (SILO) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.4.3 Sertifikat Kompetensi Operator yang diterbitkan oleh Lb/alat 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
lembaga/oinstansi yang berwenang
3.4.4 Surat Pengesahan Organisasi K3 (P2K3) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.4.5 Perizinan terkait lingkungan kerja Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.5 Personel Kesalamatan Konstruksi
3.5.1 Ahli K3 Konstruksi dan Petugas K3 Konstruksi OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.5.2 Petugas tanggap darurat OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.5.3 Petugas P3K OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.5.4 Petugas pengatur laul lintas (Flagman) OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.5.5 Tenaga paramedis dan kesehatan OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.5.6 Petugas kebersihan lingkungan OB 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
3.6 Fasilitas Sarana, Prasarana dan Alat Kesehatan
3.6.1 Peralatan P3K ( Kotak P3K, tandu) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.6.2 Ruang P3K (tempat tidur pasien, tabung oksigen, stateskop, Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
timbangan berat badan, tensi meter dan lain - lain)
3.6.3 Peralatan pengasapan (Fogging) Bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.6.4 Obat pengasapan kali 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.7 Rambu - rambu yang diperlukan
3.7.1 Rambu petunjuk Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.7.2 Rambu larangan Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.00 Err:508 Err:508 5.00 Err:508 Err:508 %
3.7.3 Rambu peringatan Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 4.00 Err:508 Err:508 4.00 Err:508 Err:508 %
3.7.4 Rambu kewajiban Bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
3.7.5 Rambu informasi Bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.00 Err:508 Err:508 2.00 Err:508 Err:508 %
3.7.6 Rambu pekerjaan sementara Bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.00 Err:508 Err:508 2.00 Err:508 Err:508 %
3.7.7 Jalur evakuasi (Escape Route) Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.7.8 Tongkat pengatur lalu lintas (Warning Lights Stick) Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.7.9 Kerucut lalu lintas (Traffic Cone) Bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
3.7.10 Lampu putar (Rotary Lamp) Bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.7.11 Lampu selang lalu lintas Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.8 Kegiatan dan Peralatan terkait dengan Pengandalian Risiko
Keslamatan Konstruksi
3.8.1 Pemeriksaan dan pengujian peralatan Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.8.2 Alat Pemadam Api Ringan (APAR) Bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3.00 Err:508 Err:508 3.00 Err:508 Err:508 %
3.8.3 Sirine Bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.8.4 Bendera K3 Bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.8.5 Lampu darurat (Emergency Lamp) Bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1.00 Err:508 Err:508 1.00 Err:508 Err:508 %
3.8.6 Pemeriksaan lingkungan kerja
- Limbah B3 Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Polusi suara Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.8.7 Pembuatan Kartu Identitas Pekerja (KIP) Org 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19.00 Err:508 Err:508 19.00 Err:508 Err:508 %
3.8.8 Program inspeksi dan audit Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3.8.9 Pelaporan dan penyelidikan insiden Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PENERAPAN SMKK Err:508 Err:508 Err:508 Err:508 Err:508

C PEKERJAAN STRUKTUR
C.1 PEKERJAAN STRUKTUR BAWAH
C.1.1 PEKERJAAN TANAH & URUGAN
1 Pek.Galian Tanah Biasa Sedalam 1 m
Galian Pondasi Pile Cap m³ 432.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 413.26 Err:508 Err:508 413.26 Err:508 Err:508 %
Galian Pasangan Pondasi Bt. Gunung m³ 329.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Galian Parit m³ 88.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Pengurugan Pasir
Urugan Pasir Bawah Pondasi Pile Cap T-10 cm m³ 48.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 50.66 Err:508 Err:508 50.66 Err:508 Err:508 %
Urugan Pasir Bawah Pasangan Pondasi Bt. Gunung T-10 cm m³ 22.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Urugan Pasir Bawah Parit T-10 cm m³ 18.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek.Lantai Kerja
Lantai Kerja Bawah Pondasi Pile Cap T-5 cm m³ 24.27 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 25.33 Err:508 Err:508 25.33 Err:508 Err:508 %
Lantai Kerja Bawah Parit Keliling Bangunan T-5 cm m³ 5.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek.Pembuatan Parit Keliling + Plesteran + Acian,1pc : 2pp T-15 cm m² 40.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Pembuatan Bak Kontrol Unit 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- -
C.1.2 PEKERJAAN SUB.STRUKTUR. - -
1 Pengadaan dan Pemancangan Spun Pile, Ø 40 m¹ 3,024.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 6,473.00 Err:508 Err:508 6,473.00 Err:508 Err:508 %
2 Pengadaan dan Pemancangan Spun Pile, Ø 30 m¹ 1,961.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 216.00 Err:508 Err:508 216.00 Err:508 Err:508 %
3 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m m¹ 150.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Cerucuk kayu 10/10. 4 m. Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Cerucuk ulin 8/8 p. 2m Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 1 m m¹ 185.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
5 Pengelasan Sambungan Tiang Pancang Ø 40 m¹ 38.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 342.72 Err:508 Err:508 342.72 Err:508 Err:508 %
6 Pengelasan Sambungan Tiang Pancang Ø 30 m¹ 13.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 8.46 Err:508 Err:508 8.46 Err:508 Err:508 %
7 Pemotongan Kepala Tiang Pancang Ttk 190.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 281.00 Err:508 Err:508 281.00 Err:508 Err:508 %
8 Pondasi Type A. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type A. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ 70.98 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 90.58 Err:508 Err:508 90.58 Err:508 Err:508 %
Bekisting Pondasi m² 109.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 109.20 Err:508 Err:508 109.20 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 30.16 Err:508 Err:508 30.16 Err:508 Err:508 %
Besi Beton Ulir Kg 16,334.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 19,813.88 Err:508 Err:508 19,813.88 Err:508 Err:508 %
9 Pondasi Type B. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type B. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ 131.82 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 167.58 Err:508 Err:508 167.58 Err:508 Err:508 %
Bekisting Pondasi m² 202.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 202.80 Err:508 Err:508 202.80 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 55.01 Err:508 Err:508 55.01 Err:508 Err:508 %
Besi Beton Ulir Kg 30,335.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 38,724.43 Err:508 Err:508 38,724.43 Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
10 Pondasi Type C. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type C.
Beton K.300 m³ 15.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Pondasi m² 40.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg 9,334.11 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
11 Pondasi Type D. 2200 x 2200 x 750 cm
Beton K.300 m³ 58.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Pondasi m² 105.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 14,322.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
12 Pondasi Type E. 800 x 800 x 500 cm
- Pondasi Type E. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ 5.44 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.88 Err:508 Err:508 2.88 Err:508 Err:508 %
Bekisting Pondasi m² 27.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 14.40 Err:508 Err:508 14.40 Err:508 Err:508 %
Besi Beton Ulir Kg 2,038.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 671.12 Err:508 Err:508 671.12 Err:508 Err:508 %
13 Pondasi Type E. 800 x 800 x 500 cm
Beton K.300 m³ 6.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Pondasi m² 21.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 705.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pondasi Type E1. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Pondasi m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek. Pasangan Pondasi Bt. Gunung Camp. 1sp : 4pp m³ 143.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek. Pasangan Batu Kosong (Anstamping) m³ 45.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL (C1) PEKERJAAN STRUKTUR BAWAH Err:508 Err:508 Err:508 Err:508 Err:508
C.2 PEKERJAAN STRUKTUR ATAS.
C.2.1 PEKERJAAN LANTAI. 1
1 Pek.Kolom Pedestal.500 x 500.
Beton K.300 m³ 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 14.42 Err:508 Err:508 14.42 Err:508 Err:508 %
Bekisting Kolom m² 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 115.36 Err:508 Err:508 115.36 Err:508 Err:508 %
Besi Beton Polos Kg 1,049.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 798.24 Err:508 Err:508 798.24 Err:508 Err:508 %
Besi Beton Ulir Kg 1,926.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,497.20 Err:508 Err:508 3,497.20 Err:508 Err:508 %
2 Pek.Kolom Pedestal.400 x 600.
Beton K.300 m³ 6.12 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 2.07 Err:508 Err:508 2.07 Err:508 Err:508 %
Bekisting Kolom m² 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 17.28 Err:508 Err:508 17.28 Err:508 Err:508 %
Besi Beton Polos Kg 451.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 114.03 Err:508 Err:508 114.03 Err:508 Err:508 %
Besi Beton Ulir Kg 818.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 499.60 Err:508 Err:508 499.60 Err:508 Err:508 %
3 Pek.Kolom Pedestal.400 x 400.
Beton K.300 m³ 3.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 38.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 334.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 834.91 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Kolom Pedestal 200 x 300
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
5 Pek.Kolom Pedestal.250 x 250.
Beton K.300 m³ 1.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 0.65 Err:508 Err:508 0.65 Err:508 Err:508 %
Bekisting Kolom m² 28.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 10.35 Err:508 Err:508 10.35 Err:508 Err:508 %
Besi Beton Polos Kg 246.95 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 51.89 Err:508 Err:508 51.89 Err:508 Err:508 %
Besi Beton Ulir Kg 468.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 182.24 Err:508 Err:508 182.24 Err:508 Err:508 %
6 Pek,Balok Suspended f S1.300 x 600.
Beton K.300 m³ 63.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 20.68 Err:508 15.52 Err:508 36.20 Err:508 Err:508 %
Bekisting Balok m² 525.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 183.84 Err:508 267.88 Err:508 451.72 Err:508 Err:508 %
Besi Beton Polos Kg 3,678.56 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,491.84 Err:508 2,186.72 Err:508 3,678.56 Err:508 Err:508 %
Besi Beton Ulir Kg 9,659.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,575.60 Err:508 5,363.40 Err:508 8,939.00 Err:508 Err:508 %
7 Pek,Balok Suspended S2.300 x 500.
Beton K.300 m³ 35.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 10.80 Err:508 8.09 Err:508 18.89 Err:508 Err:508 %
Bekisting Balok m² 44.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 102.80 Err:508 107.94 Err:508 210.74 Err:508 Err:508 %
Besi Beton Polos Kg 2,210.98 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 874.56 Err:508 918.30 Err:508 1,792.86 Err:508 Err:508 %
Besi Beton Ulir Kg 4,586.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,688.47 Err:508 1,772.89 Err:508 3,461.36 Err:508 Err:508 %
8 Pek,Balok Suspended S3.250 x 400.
Beton K.300 m³ 48.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 12.98 Err:508 9.73 Err:508 22.71 Err:508 Err:508 %
Bekisting Balok m² 505.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 155.70 Err:508 233.55 Err:508 389.25 Err:508 Err:508 %
Besi Beton Polos Kg 3,650.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,381.65 Err:508 2,072.48 Err:508 3,454.13 Err:508 Err:508 %
Besi Beton Ulir Kg 8,407.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 3,065.09 Err:508 4,597.63 Err:508 7,662.72 Err:508 Err:508 %
9 Pek,Balok Suspended S4.200 x 350.
Beton K.300 m³ 22.73 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 5.76 Err:508 4.32 Err:508 10.08 Err:508 Err:508 %
Bekisting Balok m² 292.27 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 125.66 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 %
Besi Beton Polos Kg 2,073.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 781.03 Err:508 1,171.54 Err:508 1,952.57 Err:508 Err:508 %
Besi Beton Ulir Kg 4,437.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 1,672.89 Err:508 2,509.34 Err:508 4,182.23 Err:508 Err:508 %
10 Pek,Balok Suspended S5.150 x 200.
Beton K.300 m³ 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 0.82 Err:508 0.61 Err:508 1.43 Err:508 Err:508 %
Bekisting Balok m² 7.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 27.17 Err:508 40.76 Err:508 67.93 Err:508 Err:508 %
Besi Beton Polos Kg 98.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 406.59 Err:508 609.88 Err:508 1,016.47 Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 320.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 189.12 Err:508 189.12 Err:508 Err:508 %
Besi Beton Polos Kg 5,137.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 1,095.38 Err:508 1,095.38 Err:508 Err:508 %
Besi Beton Ulir Kg 1,917.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 3,429.94 Err:508 3,429.94 Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ 7.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,027.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 378.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 10.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 2,226.43 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 605.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ 4.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 76.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 440.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,248.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Kolom K4.250 x 250 Rump.
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 13.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 494.56 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 4,421.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek.Balok B5.200 x 300. Bordes Tangga )
Pek.Balok B5.200 x 300. Bordes Tangga & Ramp )
Beton K.300 m³ 0.36 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 4.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 34.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 59.23 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
17 Pek.Balok Latai.110 x 110.
Beton K.100 m³ 0.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 16.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 300.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek.Plat Lantai T-15 cm
Beton K.300 m³ 257.15 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 104.32 Err:508 117.36 Err:508 221.69 Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 1,714.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 695.50 Err:508 1,043.24 Err:508 1,738.74 Err:508 Err:508 %
Besi Beton Polos Kg 34,147.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 11,471.73 Err:508 17,207.59 Err:508 28,679.32 Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
19 Pek.Plat Rump T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ 11.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 94.33 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat Ramp m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,163.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
20 Pek.Plat Tangga T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ 2.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 52.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 519.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
21 Pek.Rabat Keliling Bangunan T-10 cm
Beton K.175 m³ 11.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat m² 238.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 2,785.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
22 Pek.Ruangan Pit Lift
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m Ttk - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
23 Pasang Konstruksi Baja WF 200.100.5,5.8 Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
24 Proteksi Anti Karat / Rust proof pada rangka baja m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
25 Pek. Screeding tebal 3 cm Untuk Pit Lift m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
26 Pek. waterproofing (Coating) Pit Lift m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
C.2.2 PEKERJAAN LANTAI. 2
1 Pek.Balok B1.300 x 500.
Beton K.300 m³ 50.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 438.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 3,143.89 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 9,287.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ 0.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 1.76 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 13.77 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 46.51 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 1.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Balok m² 11.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 109.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 178.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Balok B2.250 x 500.
Beton K.300 m³ 29.63 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 296.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,072.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,897.51 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B2.250 x 500. R. Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ 1.90 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 19.96 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 144.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 473.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek.Balok B3.250 x 400.
Beton K.300 m³ 25.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 262.74 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,896.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 4,368.01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek.Balok B4.200 x 400.
Beton K.300 m³ 14.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 180.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,259.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 2,471.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B4.200 x 400. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek.Balok B5.200 x 300.
Beton K.300 m³ 10.61 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 141.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,024.22 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,745.76 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok B5.200 x 300. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek.Balok B6.150 x 200.
Beton K.300 m³ 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 7.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 98.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek.Balok Latai, 110 x 110.
Beton K.100 m³ 1.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 27.61 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 493.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 320.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,917.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,137.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ 7.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 378.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,027.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 10.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 605.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 2,226.43 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ 0.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 69.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 197.18 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Kolom K4.250 x 250. R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 11.23 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 408.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 3,650.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek.Plat Lantai T-12 cm
Beton K.300 m³ 192.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 1,602.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 36,742.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
- Pek.Plat Lantai T-12 cm R.Gas Medic
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
Bekisting Plat Lantai (Bondeks) m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 0.00 %
17 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 1.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai m² 196.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 460.19 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek.Plat Rump T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ 11.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 94.33 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,163.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
19 Pek.Plat Tangga T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ 2.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 52.31 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 519.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

C.2.3 PEKERJAAN LANTAI. 3


1 Pek.Kolom K1.500 x 500.
Beton K.300 m³ 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 320.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,969.46 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,352.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Kolom K2.400 x 600.
Beton K.300 m³ 7.68 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 64.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 378.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,027.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 10.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Kolom m² 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 605.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 2,226.43 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Kolom K4.250 x 250.
Beton K.300 m³ 0.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 69.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 197.18 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 8.95 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 325.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,910.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek.Balok B1.300 x 500.
Beton K.300 m³ 52.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 455.65 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 3,269.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 9,659.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ 1.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 11.83 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 92.85 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 313.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 1.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Balok m² 11.55 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 109.64 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 178.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
9 Pek.Balok B2.250 x 500.
Beton K.300 m³ 7.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 73.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 514.26 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,463.18 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ 2.05 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 22.03 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 155.24 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 509.62 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pek.Balok B3.250 x 400.
Beton K.300 m³ 28.42 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 265.89 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,153.89 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 4,960.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pek.Balok B4.200 x 400.
Beton K.300 m³ 14.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 180.84 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,259.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 2,471.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pek.Balok B5.200 x 300.
Beton K.300 m³ 8.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 112.90 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 807.66 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 1,376.65 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Pek.Balok B6.150 x 200.
Beton K.300 m³ 0.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 7.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 98.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek.Balok Latai.110 x 110.
Beton K.100 m³ 1.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 22.99 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 481.88 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek.Plat Lantai T-12 cm
Beton K.300 m³ 111.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 929.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 21,307.19 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
17 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 1.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat Lantai m² 191.72 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 447.87 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
18 Pek.Plat Lantai T-12 cm (Watherprofing)
Beton K.300 m³ 69.12 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai m² 576.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 13,210.35 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
19 Pek.Plat Tangga T-12 cm (Lt.3 - Lt.DAK)
Beton K.300 m³ 1.36 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Tangga m² 24.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 259.73 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

C.3 PEKERJAAN RING BALOK RL. 1


1 Pek.Balok B1.300 x 500.
Beton K.300 m³ 50.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 434.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 3,118.23 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 9,211.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ 16.32 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 114.18 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 1,110.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 3,748.16 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
3 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 0.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Balok m² 5.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 54.82 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Ulir Kg 89.01 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
4 Pek.Balok B2.250 x 500.
Beton K.300 m³ 29.63 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 296.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,072.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 5,897.51 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ 0.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 10.69 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 73.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 240.88 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek.Balok B3.250 x 400.
Beton K.300 m³ 28.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 297.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 2,150.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 4,951.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pek.Balok Kantilever B3.250 x 400.
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek.Balok B4.200 x 400.
Beton K.300 m³ 1.53 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² 19.11 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 133.11 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg 261.12 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek.Balok B5.200 x 300.
Beton K.300 m³ - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Balok m² - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Ulir Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek.Kolom KP.110 x 110.
Beton K.100 m³ 0.19 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Kolom m² 7.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 62.94 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek.Plat Lantai T-12 cm (Watherprofing)
Beton K.300 m³ 48.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 403.12 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Besi Beton Polos Kg 9,245.41 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Kg - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 1.82 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Bekisting Plat Lantai m² 181.73 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
Besi Beton Polos Kg 424.54 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - 0.0000% 0.0000% - 0.0000% 0.00 %
SUB TOTAL (C2) PEKERJAAN STRUKTUR ATAS Err:508 Err:508 Err:508 Err:508 Err:508

LINGKUP PEKERJAAN : ARSITEKTUR


I PEKERJAAN PERSIAPAN
1 Pek. Direksikeet m² 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 40.00 Err:508 Err:508 40.00 Err:508 Err:508 %
2 Pembersihan Awal dan Akhir Ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 0.50 Err:508 Err:508 0.50 Err:508 Err:508 %
SUB TOTAL PEKERJAAN PERSIAPAN Err:508 Err:508 Err:508 Err:508 Err:508

II PEK. PASANGAN DINDING BATA


1 Pek. Dinding Trasram 1:3 m² 1,178.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Dinding batu bata 1:5 m² 943.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Plesteran 1:5 m² 1,886.93 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Plesteran Dinding 1:3 m² 2,356.04 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Acian Dinding m² 4,242.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN DINDING BATA Err:508 Err:508 Err:508 Err:508 Err:508

III PEK. PASANGAN DINDING KHUSUS


1 Pek. Dinding Gypsum + Rangka m² 1,184.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Dempul Dinding Gypsum m² 1,184.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Dinding Timbal 2mm + Rangka R. OK m² 139.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Dinding Timbal 2mm + Rangka R. Radiologi m² 158.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN DINDING KHUSUS Err:508 Err:508 Err:508 Err:508 Err:508

IV PEK. PASANGAN LANTAI


1 Pek. Rolag Bata Teras m² 95.71 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Lantai Granit 60 x 60 cm Interior Lt. 01 m² 726.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Lantai Granit 60 x 60 cm Interior Lt. 02 m² 1,113.85 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Lantai Granit 60 x 60 cm Interior Lt. 03 m² 763.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek. Lantai Granit 60 x 60 cm Eksterior m² 293.75 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pas. Lantai Keramik 40x40 Tangga Utama m² 74.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pas. Lantai Bordes Keramik 40x40 Tangga Utama m² 10.45 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pas. Lantai Keramik 40x40 Tangga Darurat + Steepnosing m² 39.90 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pas. LantaiBordes Keramik 40x40 Tangga Darurat m² 2.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pas. Keramik Lantai 20x20 KM/WC LT.01 m² 78.37 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pas. Keramik Lantai 20x20 KM/WC LT.02 m² 132.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pas. Keramik Lantai 20x20 KM/WC LT.03 m² 57.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pas. Dinding Keramik 20x20 KM/WC LT.01 m² 271.58 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pas. Dinding Keramik 20x20 KM/WC LT.02 m² 290.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pas. Dinding Keramik 20x20 KM/WC LT.03 m² 90.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Pas. List Dinding Keramik 10x20 KM/WC m² 363.77 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek. Rabat Lantai Luar ( Plat Teras ) t=7cm m³ 20.56 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek. Lantai Vinyl t = 3mm LT. 01 m² 735.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
17 Pek. Lantai Vinyl t = 3mm LT. 02 m² 366.45 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek. Lantai Vinyl t = 3mm LT. 03 m² 241.90 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN LANTAI Err:508 Err:508 Err:508 Err:508 Err:508

V PEK. KUSEN ALLUMUNIUM


1 Pek. Kosen Pintu P1 m¹ 139.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Kosen Pintu P2 m¹ 1,373.60 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Kosen Pintu P3 m¹ 61.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Kosen Pintu P4 m¹ 364.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek. Kosen Pintu P5 m¹ 5.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Kosen Pintu P6 m¹ 112.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek. Kosen Pintu PK1 m¹ 32.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek. Kosen Pintu PG1 m¹ 83.20 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek. Kosen Pintu PG2 m¹ 6.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek. Kosen Pintu PG3 m¹ 34.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Pek. Kosen PD1 m¹ 23.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
16 Pek. Kosen PD2 m¹ 125.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
17 Pek. Kosen PD3 m¹ 102.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
18 Pek. Kosen K1 m¹ 352.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
19 Pek. Kosen K2 m¹ 31.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
20 Pek. Kosen K3 m¹ 15.34 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
21 Pek. Kosen K4 m¹ 9.06 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
22 Pek. Kosen K4' m¹ 12.08 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
23 Pek. Kosen K4'' m¹ 7.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
24 Pek. Kosen K5 m¹ 77.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
25 Pek. Kosen K5' m¹ 9.40 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
26 Pek. Kosen K5'' m¹ 6.14 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
27 Pek. Kosen K6 m¹ 48.02 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
28 Pek. Kosen K6' m¹ 15.86 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
29 Pek. Kosen K7 m¹ 30.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
30 Pek. Kosen K8 m¹ 19.41 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
31 Pek. Kosen K9 m¹ 23.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
32 Pek. Kosen K10 m¹ 17.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
33 Pek. Kosen Jendela J1 m¹ 120.70 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
34 Pek. Kosen Jendela J2 m¹ 107.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
35 Pek. Kosen Jendela J3 m¹ 21.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
36 Pek. Kosen Jendela J4 m¹ 160.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
38 Pek. Pas. Kaca 5 mm m² 52.80 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
39 Pek. Pas. Tempered Glass 8 mm m² 253.67 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
40 Pek. Pas. Tempered Glass 12 mm m² 292.92 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. KUSEN ALLUMUNIUM Err:508 Err:508 Err:508 Err:508 Err:508

VI PEK. PINTU / JENDELA / VENTILASI


1 Pek Daun Pintu Bengkirai m² 22.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L=140cm m² 2.59 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L=120cm m² 98.78 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L = 90 cm m² 334.88 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L = 80 cm m² 1.61 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Pintu PVC Toilet Type 1 m² 117.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pek. Pintu PVC Toilet Type 2 m² 30.19 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pek. Pas. Pintu Kaca Tempered + Aksesoris Bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek. Frame Allumunium Daun Jendela m² 10.11 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pek. Pintu Operasi L = 160 terpasang Bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pek. Pintu Operasi (Pintu Hermatik) L = 140 terpasang Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pek. Pintu Operasi L = 90 terpasang Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PINTU / JENDELA / VENTILASI Err:508 Err:508 Err:508 Err:508 Err:508

VII PEK. PLAFOND


1 Pas. Plafond Gypsum 9 mm + Rangka Hollow 4/4 cm m² 3,705.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pas. Plafond GRC 6 mm + Rangka Hollow 4/4 cm m² 561.52 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pas. List Plafond Gipsum m² Err:508 Err:508
SUB TOTAL PEK. PLAFOND Err:508 Err:508 Err:508 Err:508 Err:508

VIII PAS. KUNCI DAN ALAT PENGGANTUNG


1 Pas. Kunci Pintu 2 Slaag Stainless Bh 52.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pas. Handle Pintu Bh 476.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pas. Handle Pintu Geser Bh 38.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pas. Door Stopper Bh 399.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pas. Kunci Tanam Bh 104.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pas. Sliding Rell Bh 19.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pas. Bottom Guide Bh 57.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pas. Door roller Bh 19.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pas. Grendel Jendela Bh 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Pas. Engsel Pintu Psg 970.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pas. Floor Hinge Psg 17.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Pas. Engsel Jendela Psg 62.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Pas. Hak Kait Angin Psg 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Pas. Tarikan jendela Psg 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PAS. KUNCI DAN ALAT PENGGANTUNG Err:508 Err:508 Err:508 Err:508 Err:508

IX PEK. PENGECATAN
1 Pek. Cat Dinding Tembok Luar m² 943.47 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Cat Dinding Tembok Dalam m² 641.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Cat Dinding Gypsum m² 1,184.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Cat Daun Pintu Bengkirai m² 22.25 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pek. Cat Dinding Epoxy m² 641.97 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pek. Cat Plafond m² 4,266.62 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. PENGECATAN Err:508 Err:508 Err:508 Err:508 Err:508

X PEK. SANITASI
1 Pek. Pasangan Wastafel Lengkap Set 96.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Pasangan Urinoir Set 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Pasangan Closet Duduk Set 63.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Pasangan Closet Jongkok set 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pasangan Kran Tembok Unit 96.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pasangn Jet Washer Unit 77.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pasangn Hand Shower Unit 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Floor Drain bh 51.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEK. SANITASI Err:508 Err:508 Err:508 Err:508 Err:508

XI PEKERJAAN LAINYA
1 Pek. Railling Tangga Umum terpasang m' 13.48 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Pek. Hand Railling Koridor m' 126.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Pek. Railling Teras Luar terpasang m' 86.87 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pek. Pas. Sunblas Kaca m² 2.09 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Pas.Grab Bar Toilet Disable Bh 34.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Pas. Scrub Up R. OK 2 Person Bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Pas. Spoel Hoek Bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Pas. Pekerjaan Tangga Darurat Rangka Baja Set 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Pek. Tulisan "Rumah Sakit Korpri" bh 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PEKERJAAN LAINYA Err:508 Err:508 Err:508 Err:508 Err:508

LINGKUP PEKERJAAN : MEEP


A PEKERJAAN ELEKTRIKAL
1 PERALATAN UTAMA
1 GENSET (Generator Set) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Kap : 630 KVA
Type : Silent
2 Tansformator unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Kap : 630 KVA
Type : Indoor
3 Tangki Bulanan unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
kap : 5000 ltr
Termasuk pondasi/dudukan tangki
4 Tanki Solar Harian termasuk pompa solar dan Instalasinya lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Cubicle Incoming LBS 630A unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Cubicle Outgoing LBS 630A with Fuse unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Grounding Trafo, Tangki solar, Cubicle, Genset) lot 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
PENYAMBUNGAN LISTRIK PLN KAP. 555 KVA
1 Biaya Pasang Baru VA 555,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Uang Jaminan Langganan (UJL) VA 555,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Sertifikasi Laek Operasi (SLO) VA 555,000.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

PEKERJAAN KABEL FEEDER


a Kabel TM 20 KV dari OutGoing (Gardu PLN) ke:
1 Cubicle Incoming NA2XSEY 1c x 150 mm2 (Gardu Pelanggan) m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
b Kabel TM 20 KV dari OutGoing Pelanggan ke:
2 Transformator 630 KVA NA2XSEY 1c x 150 mm2 m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
c Dari Transformator 630 KVA ke :
1 Panel ATS (di R.Genset) NYY 1c x 240 mm2 m' 132.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
d Dari Genset 500 KVA ke :
1 Panel ATS (di R.Genset) NYY 1c x 240 mm2 m' 154.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
e Dari Panel ATS ke :
1 Panel LVMDP (di Gedung) NYY 1c x 240 mm2 m' 660.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
f Dari LVMDP ke:
1 PP AC LT-ATAP NYY 4x95 mm2 m' 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 LP LT-1 NYY 4x16 mm2 m' 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 LP LT-2 NYY 4x16 mm2 m' 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 LP LT-3 NYY 4x16 mm2 m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 PP Lift pasien FRC 4x16 mm2 m' 44.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 PP Booster pump NYY 4x10 mm2 m' 40.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 PP Power House NYY 4x10 mm2 m' 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 PP Pompa Hydrant FRC 1cx35 mm2 m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 PP Pompa Transfer Air Bersih NYY 4x10 mm2 m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Rak kabel ledder W 400 mm , H 100 mm m' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA Err:508 Err:508 Err:508 Err:508 Err:508
2 PEKERJAAN LAMPU DAN INSTALASI
LANTAI 1
PANEL-PANEL
- PANEL LVMDP set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- PANEL Capasitor bank kap 200 KVAR set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
- LP-LANTAI 1 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- Rak kabel ledder W 300 mm , H 100 mm m' 10.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Tray W 300 mm , H 50 mm m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Grounding lot 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LAMPU DAN ACCESSORIES
- LED PANEL SPARC 30120 32w/865 bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh 13.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA G2 114 LED 7W/CW bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LED BULB 10W E27 6500K 230V INDO bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Exit Lamp LED 3 Watt bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- EXHAUST FAN 24 CDQN KDK 8" 105 CFM 18 W bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Double bh 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 86.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 32.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
PANEL-PANEL
- PP-LANTAI 2 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- Kabel Tray W 300 mm , H 50 mm m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Grounding lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LAMPU DAN ACCESSORIES
LED PANEL SPARC 30120 32w/865 bh 7.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh 7.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
FREZA G2 114 LED 7W/CW bh 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LEDBULB 10W E27 6500K 230V INDO bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Exit Lamp LED 3 Watt bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Saklar Tunggal bh 17.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Saklar Double bh 13.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 71.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
PANEL-PANEL
- PP-LANTAI 3 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
• Komponen
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.2

- Kabel Tray W 300 mm , H 50 mm m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Grounding lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
LAMPU DAN ACCESSORIES
- LED PANEL SPARC 30120 32w/865 bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh - Err:508 Err:508 Err:508 Err:508
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh 33.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FREZA G2 114 LED 7W/CW bh 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LEDBULB 10W E27 6500K 230V INDO bh - Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
- Exit Lamp LED 3 Watt bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Double bh 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 86.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 36.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 3 Err:508 Err:508 Err:508 Err:508 Err:508
3 RUANG GENSET
- MCB BOX 6 GROUP set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal : 2,0 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa co: RAL 7032 ttk 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa c : Powder Coating ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL RUANG GENSET Err:508 Err:508 Err:508 Err:508 Err:508
4 RUANG POMPA
- MCB BOX 4 GROUP set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak 200W bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Saklar Tunggal bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL RUANG POMPA Err:508 Err:508 Err:508 Err:508 Err:508

B PEKERJAAN TATA UDARA


LANTAI 1
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Tipe
Kapasitas
Daya
Data List.
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' 11.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- FLEXIBLE DUCT 4'' m' 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- EAG (EXHAUST AIR grille) 150X150mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- AC Caseete (Split Duct) 4 PK + Hepa Filter System titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- AC Split Ducting 1- 2 PK titik 75.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
PEKERJAAN TATA UDARA
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type: Ceiling Fan
Kapasitas: 75 Cfm
Daya: 35 w
Data List: 220 V/1 Ph/50 Hz
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' 22.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Duct 4" m' 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- EAG (Exhaust Air grille) 150X150mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- AC Split Ducting titik 75.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
LANTAI 3
PEKERJAAN TATA UDARA
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type: Ceiling Fan %
Kapasitas: 75 Cfm %
Daya: 35 w %
Data List: 220 V/1 Ph/50 Hz %
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' 22.10 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Duct 4" m' 13.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- EAG (Exhaust Air grille) 150X150mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- AC Split Ducting titik 62.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 3 Err:508 Err:508 Err:508 Err:508 Err:508

C PEKERJAAN AIR BERSIH


1 Roof tank
Type
Kapasitas : 10 M3 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : FRP
2 Floating Valve Ø 1" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Gate Valve, Ø 2" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Pipa PPR, Ø 2" m 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 WLC (Water Level Control) bh 1.00 Err:508 Err:508 Err:508 Err:508 - Err:508 - Err:508 Err:508 - Err:508 0.00 %
6 Tansfer pump set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Vertikal multi stage
Kapasitas : 450 lpm total Head 40 mtr
Daya : 5,5 KW
Panel kontrol star-stop
7 Booster pump pakage set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Vertikal multi stage
Kapasitas : 450 lpm total Head 20 mtr
Daya : 2,2 KW
Panel kontrol star-stop
SUB TOTAL AIR BERSIH PEKERJAAN UTAMA Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bersih Lantai 1
- Pipa PPR, Ø 1" m 9.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa PPR, Ø 3/4" m 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa PPR, Ø 1/2 " m 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve, Ø 1" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bersih Lantai 2
- Pipa PPR, Ø 1,5" m 38.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa PPR, Ø 1" m 11.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa PPR, Ø 3/4" m 6.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa PPR, Ø 1/2 " m 72.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve, Ø 1,5" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bersih Lantai 3
- Pipa PPR, Ø 1,5" m 38.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PPR, Ø 1" m 11.30 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PPR, Ø 3/4" m 18.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PPR, Ø 1/2 " m 72.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Gate Valve, Ø 1,5" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 3 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bersih Lantai Atap
- Pipa PPR, Ø 2" m 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT ATAP Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi pipa Riser
- Pipa PPR, Ø 2" m 48.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BERSIH RISER Err:508 Err:508 Err:508 Err:508 Err:508

D PEKERJAAN AIR KOTOR


Peralatan Utama
Pekerjaan Instalasi Air Kotor Lantai 1
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 4.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR KOTOR LT.1 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Kotor Lantai 2
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 4.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL KOTOR LT.2 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Kotor Lantai 3
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 4.50 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL KOTOR LT.3 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi pipa Riser
Pipa PVC Class AW
- dia. 150 mm m 48.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR KOTOR RISER Err:508 Err:508 Err:508 Err:508 Err:508

E PEKERJAAN AIR BEKAS


Pekerjaan Instalasi Air Bekas Lantai Basement
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 150 mm m 28.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 100 mm m' 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 13.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.1 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bekas Lantai 1
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.1 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Bekas Lantai 2
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.2 Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
Pekerjaan Instalasi Air Bekas Lantai 3
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 50 mm m' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Floor Clean Out dia. 3" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.3 Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi Air Hujan lt.Atap
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 150 mm m 44.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 100 mm m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Roof Drain dia. 4" bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL AIR HUJAN LT. ATAP Err:508 Err:508 Err:508 Err:508 Err:508
Pekerjaan Instalasi pipa Riser
Pipa PVC Class AW
- dia. 150 mm m 28.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia. 80 mm m' 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL INSTALASI PIPA RISER Err:508 Err:508 Err:508 Err:508 Err:508

F PEKERJAAN TATA SUARA


MAIN UNIT
1 Remote Paging Microphone 1 RM-200M bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 CD/MMC/USB player with FM Tunner Z-CD2011R bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Emergency Message Panel Z-FV200EV-AS bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Digital Matrix Mixer w/ Equalizer Program M-9000M2. set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Speaker Selector 10 ch bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Power Amplifier 480W Z-FV248PA-AS bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Cabinet Rack with Acc. RACK 23. set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 1
1 Terminal box (TBS) set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Horn speaker 30 W ZH-615SM bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Ceiling Speaker 6 Watt ZS-648R bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 volume control bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Kabel Feeder dari Juction Panel ke ;
- TBS BS, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Terminal box (TBS) set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker 6 Watt ZS-648R bh 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 volume control bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 31.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Kabel Feeder dari Juction Panel ke ;
- TBS BS, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Terminal box sound (TBS) set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker 6 Watt type LHM0606/10 bh 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 volume control bh 11.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Kabel Feeder dari Juction Panel ke ;
- TBS 1, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508 Err:508 Err:508 Err:508 Err:508

G PEKERJAAN CCTV
MAIN UNIT
1 Network Video Recorder type DRN-5532-400N00 unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 TV / Monitor 32 Inc unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 PoE Gigabyte 24 Port unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Equitment Rack 12 U Indorack IR8012G unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 1
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 IP Dome Camera type NUC-51022-F2 unit 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CCTV LT 3 Err:508 Err:508 Err:508 Err:508 Err:508

H PEKERJAAN TELEPHONE
MAIN UNIT
1 Pabx Panasonic NS 300 6 Line 80 Extension Analog set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 MDF + Surge Arester set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Batery Back Up 2200 VA set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Kabel Fider
4 - Dari TB Lt 1 ke TB Lt 2 kabel ITC 10 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 - Dari TB Lt 2 ke TB Lt 3 kabel ITC 20 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 - Dari TB Lt 3 ke TB Lt 4 kabel ITC 30 pair include pipa conduit m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 - Dari TB Lt 4 ke TB Lt 5 kabel ITC 30 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 - Dari TB Lt 5 ke TB Lt 6 kabel ITC 20 pair include pipa conduit m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 1
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 29.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 44.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Terminal Box set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Outlet Telepon RJ 11 set 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Kabel Tray 200x50 m' 55.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 3 Err:508 Err:508 Err:508 Err:508 Err:508

I PEKERJAAN FIRE ALARM


PERALATAN UTAMA
1 Fire panel w ith Module & Remote Service FPA-1200-C-APR unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Remote Keypad FMR-5000-C-13 bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 MDF + Surge Arester set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Batery Back Up set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Grounding 0.1 Ohm lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
LANTAI 1
1 Terminal Box Fire Alarm (TBFA) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh 26.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Smoke detector optical FCP-O320 bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Motor bell, 6" 24V, red MB-G6-24-R bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Beacon, surface-mount, red FNS-320-SRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik 26.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 FE (APAR) Type CO2 kapasitas 5 Kg unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Terminal Box Fire Alarm (TBFA) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Motor bell, 6" 24V, red MB-G6-24-R bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Beacon, surface-mount, red FNS-320-SRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 FE (APAR) Type CO2 kapasitas 5 Kg unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Terminal Box Fire Alarm (TBFA) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Motor bell, 6" 24V, red MB-G6-24-R bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Beacon, surface-mount, red FNS-320-SRD bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 FE (APAR) Type CO2 kapasitas 5 Kg unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 3 Err:508 Err:508 Err:508 Err:508 Err:508

J PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan penangkal petir elektro statis termasuk perijinan instansi terkait
- Penangkal petir elektro statis radius 120 Mtr lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- OBS ligthing
- Tiang single pole tinggi +- 15 meter
- NYY 70 mm
- Counter struk
- Grounding 1 ohm
- Bak kontrol (40x40) dengan penutup plat besi
SUB TOTAL PENENGKAL PETIR Err:508 Err:508 Err:508 Err:508 Err:508

K PEKERJAAN CABLE TV
LANTAI 1
- Outlet TV bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
- Outlet TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 16.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
- Outlet TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Splitter bh 3.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Tap Off bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi Power CABLE TV titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL CABLE TV LT 3 Err:508 Err:508 Err:508 Err:508 Err:508

L PEKERJAAN LAN
LANTAI 1
1 Outlet LAN RJ 45 bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 6 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 1 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
1 Outlet LAN RJ 45 bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 24 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 2 Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 3
1 Outlet LAN RJ 45 bh 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Switch HUB 24 port bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL LAN LT 3 Err:508 Err:508 Err:508 Err:508 Err:508

M PEKERJAAN SISTEM ELEVATOR.


2 Peralatan Utama & Penunjang.
Unit Lift Passanger (Pasien) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Kapasitas : 15 Orang ( 1.200 kg )
Kecepatan : 105 m/menit
Pelayanan : Lt. 1 s/d LT.3
Termasuk Automatic Rescue Device (ARD) untuk lift passanger.
SUB TOTAL PEKERJAAN ELEVATOR Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)

N PEKERJAAN HYDRANT & SPLINKLER


Pengadaan , pemasangan dan pengujian peralatan pompa-pompa
lengkap terpasang sesuai dengan spesifikasi tehnis dan gambar rencana.
Termasuk perijinan dari instansi terkait
a PERALATAN UTAMA
1 Pompa Diesel Fire Pump (DFP) - (NFPA - 20 Non Listed). unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Model : 100-80 FSJ, couple whit Iveco Engine.
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Engine : Clarke engine power 99BHP@2900 rpm.
Type Engine : N45 MNA F40.
- Base Plate Coupling & Guard.
Control Panel For Diesel Engine Driven Pump-NFPA20 Non Listed.
Complete with :
- Suction & Discharge gauge
- Batteries
- Steel baseplate
- Flexible Coupling
- Steel Coupling Guard
- Industral Silenser
- Fuel tank

2 Pompa Elektrik Fire Pump - nfpa 20 Non Listed unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Model : 100-80 fscj
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Complete with :
- Electric Motor ( fatory choice ), 75 kW / 3 x 380 V / 50 Hz / 3 P 2.900 rpm.
- Panel controller Y Delta open transition, NFPA- 20 Non Listed.
- Base Plate coupling and guard.

3 Pompa Jockey Pump ( JFP ) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Model : CRS-20, Groudpos Pump.
Kapasitas : 75 GPM
Head : 100 m.
Type : Vertical Multi Stage.
Power : 7,5 kW/380V/50Hz/3ph/2900 rpm.
Accessories : Suction & Discharge gauge.
Jockey Pump controller NFPA-20 Non Listed

Pengadaan , pemasangan dan pengujian peralatan accessories dan


katu-katup lengkap terpasang sesuai dengan spesifikasi tehnis dan
gambar rencana.
4 Pipa Instalasi
- Pipa Header dia 200 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia 100 mm m' 24.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia 65 mm m' 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Non Return Valve
- dia 80 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- dia 50 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Gate Valve
- Gate Valve dia 100 mm bh 8.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 80 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 50 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Strainer
- Strainer dia 100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Strainer dia 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

8 Flexible Joint
- Flexible Joint dia 50 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 65 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 80 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Flexible Joint dia 100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

9 Butterfly Valve
- Batterflay Valve dia 100 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Batterflay Valve dia 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Batterflay Valve dia 65 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

10 Floater valve I/D pilot control dia 65 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 80 mm bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 15 mm bh 12.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Pressure Reducing Valve (PRV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Premming Tank 250 ltr bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
13 Sefety Valve dia.100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
14 Safety valve dia.20 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
15 Alarm Gong bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA Err:508 Err:508 Err:508 Err:508 Err:508
b PEKERJAAN INSTALASI FIRE HYDRANT
1 SITE PLAN
Pemipaan
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 150 mm (sprinkler dari ruang pompa ke gedung m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 100 mm (sprinkler dari ruang pompa ke gedung m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 100 mm hydrant kawasan m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Hydrant Pilar (HP) bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Outdoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Hose Reel Cabinet (HRC) bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Siamese Conection (SC) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Check Valve : 100 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve dia 100 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Galian Pipa + Timbunan kembali dengan kedalaman 60 cm. m' 65.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT SITE PLAN Err:508 Err:508 Err:508 Err:508 Err:508
2 LANTAI 1
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 100 mm m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 80 mm m' 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 125.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.1 Err:508 Err:508 Err:508 Err:508 Err:508
3 LANTAI - 2
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm M' 18.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 95.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.2 Err:508 Err:508 Err:508 Err:508 Err:508
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
4 LANTAI - 3
Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' 14.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa dia : 65 mm M' 26.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Indoor Hydrant Box Unit bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Gate Valve : 65 mm bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh 4.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh 75.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL HYDRANT LT.3 Err:508 Err:508 Err:508 Err:508 Err:508
O PEKERJAAN GAS MEDIS
PERALATAN UTAMA GAS MEDIS
1 Sentral Oksigen Kapasitas 2x10 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Automatic
terdiri dari :
- Full digital automatic change over device
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder

2 Sentral N20 Kapasitas 2x2 set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Manual
terdiri dari :
- Regulator
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder

3 Sentral Compress Air set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Duplex System
terdiri dari :
- Compressor kapasitas 405 l/m; 3 ph Hitachi, OILESS Copressor
- Compressor Tank (vol.50 ltr) - lokal
- Air Dryer
- Pre Filter
- After Filter
- Control Panel-Panel
- Instalasi Pipa sentral Compressor Air
- Regulator Compressore Air- Low Pressure, single Stage SMC
- Compressore switch

4 Sentral Vacuum set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Vacuum Pump kapasitas 165 M3/H; 2,2 KW
- Vacuum Tank (volume 500 liter) Lokal
- Bacterial Filter
- Control Panel Lokal
- Support & Consumeble material
- Vacuum Switch

5 Arlarm type IV gas bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

INSTALASI GAS MEDIS

MAIN LINE DARI SENTRAL & SHAFT (Sentral 4 Gas)


6 Pemipaan gas Oksigen
- Pipa tembaga Medis ASTM B819 type L, INIPRO Ø 1 3/8" m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga Medis ASTM B819 type L, INIPRO Ø 3/4" m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

7 Pemipaan Gas N2O


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

8 Pemipaan Compress Air


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

9 Pemipaan Vacuum
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 5/8" m' 35.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

10 Ball Valve 3/4" bh 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
11 Ball Valve 1 1/4" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
12 Ball Valve 1 1/2" bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA GAS MEDIS Err:508 Err:508 Err:508 Err:508 Err:508
LANTAI 2
Pekerjaan Insatalasi Gas medis pipa tembaga medis ASTM B-819 termasuk support dan materian bantu
1 Pemipaan gas Oksigen
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 60.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

2 Pemipaan gas N2O


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

3 Pemipaan gas Air


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

4 Pemipaan gas Vacuum


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 20.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 135.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 60.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

5 Pemipaan gas AGSS/WAGD


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 10.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet O2, OHMEDA Satandart, TRITECH bh 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet N2O, OHMEDA Satandart, TRITECH bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet Commpress Air, OHMEDA Satandart, TRITECH bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet Vacuum, OHMEDA Satandart, TRITECH bh 15.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet AGSS/WAGD, OHMEDA Satandart, TRITECH bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

6 Zone Valve dan Alarm


- Box Valve type IV gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Alarm type IV gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Box Valve type III gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Alarm type III gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Ceilling Gas 4 Gas set 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Ball Valve 1/2" bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL GAS MEDIS LT.2 Err:508 Err:508 Err:508 Err:508 Err:508
3 Lantai 3
Pekerjaan Insatalasi Gas medis pipa tembaga medis ASTM B-819 termasuk support dan materian bantu
1 Pemipaan gas Oksigen
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/4" m' 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

2 Pemipaan gas Vacuum


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' 25.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/4" m' 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' 120.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
- Wall Outlet O2, OHMEDA Satandart, TRITECH bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Wall Outlet Vacuum, OHMEDA Satandart, TRITECH bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

3 Zone Valve dan Alarm


- Box Valve type II gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Alarm type II gas (ONAV) bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

- Bedhead bh 30.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Ball Valve 3/4" bh 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL GAS MEDIS LT.3 Err:508 Err:508 Err:508 Err:508 Err:508

P PEKERJAAN NURSE CALL AIPHONE


PENGADAAN DAN PEMASANGAN PERALATAN DAN INSTALASI NURSE CALL
Lantai 1 :
1 Master Station, 20-call NIM-20B.E. bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Corridor light NIR-4.E. bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Call reset button NIR-2.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh 27.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

Lantai 2 :
1 Master Station, 20-call NIM-20B.E. bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Corridor light NIR-4.E. bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Call reset button NIR-2.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh 27.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

Lantai 3 :
1 Master Station, 20-call NIM-20B.E. bh 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Corridor light NIR-4.E. bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Call reset button NIR-2.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh 27.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk 5.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508 Err:508 Err:508 Err:508 Err:508

Q PEKERJAAN INSTALASI PENGOLAHAN LIMBAH (IPAL)

a Pengadaan Pompa termasuk Aksesories, Valve, Bronze and Support Bracket


Aksesories perpipaan, Ball Valve PVC, Cek Valve kuningan, Foot Valve, Strainer
( menyesuaikan ukuran In/Out Pompa) Suport dari UNP menyesuaikan lapangan,
Instalasi pemipaan PVC class AW
1 Pengadaan Transfer Pump Influent unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Submersible
Kapasitas : 1,45 m3/jam
Head : 10 m
Max Solid Size : 45 mm
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

2 Pengadaan Transfer Pump Effluent unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Submersible
Kapasitas : 1,45 m3/jam
Head : 10 m
Max Solid Size : 45 mm
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

3 Pengadaan RAS Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,75 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

4 Pengadaan Mixing Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2,1 m3/jam
Head : 15 m
Power EM : 1,5 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
Asssesoris : Injektor

5 Pengadaan Filter Pump unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,37 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

b Pekerjaan Tanki Equalisasi unit 6.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
1 Pengadaan Corse Buble Diffuser
Diameter : 4 "
Material : ABS
Conection : 3/4 "
Ukuran Bubble : lebih besar dari 4mm

2 Pengadaan Pressured Air Piping Installasi ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa PVC 3/4" yang masuk ke air
- Gate valve 3/4"
- Panjang pipa dan jumlah aksesoris menyesuaikan kebutuhan di lapangan

c Pekerjaan Kolam Aerasi


1 Pengadaan Blower unit 2.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Type : Root Rotary Blower
Negara Asal : Ex. Taiwan
Kapasitas Udara : 2,9 m³/menit/unit
Maximum Presure : 4.000 mm Aq
Outlet Blower : 2,5 "
Power EM : 3,7 KW, 380 Volt 50 Hz
HARGA REALISASI MINGGU LALU REALISASI MINGGU INI REALISASI S/D MINGGU INI BOBOT
JUMLAH JUMLAH
VOLUME VOLUME VOLUME SATUAN
NO URAIAN PEKERJAAN SAT VOL. ADD N0. (Rp) BOBOT BOBOT BOBOT BOBOT PEKERJAAN
KONTRAK KURANG TAMBAH (Rp)
01 ADD N0. 01 VOLUME VOLUME VOLUME
ADD N0. 01 (%) (%) (%) TERLAKSANA (%)
2 Pengadaan Fine Buble Difuser bh 42.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Diameter : 25 cm
Kapasitas Udara : 6 - 8 m³/jam/unit
Oksigen Transfer : 20 - 40 %
Diameter Bubble : 1-3 mm
Conection : 3/4 "
Material : Frame ABS
Membrant : EPDM
Check Valve : EPDM

3 Pengadaan Pressured Air Piping Installasi ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Pipa Sch 20 diameter 4" untuk cabang - cabang
- Pipa Sch 20 diameter 6 " untuk Header
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa Stainless Steell SUS 304 Sch 10dia. 2 " dan PVC yang masuk ke air

4 Chlorinasi sistem unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

d Pekerjaan Pengadaan Electrical IPAL


1 Wiring Kabel ls 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
- Ukuran Kabel disesuaikan dengan power motor
- Merk Kabel Supreme, jembo, kabelmetal atau setara
- panjang kabel menyesuaikan di lapangan

2 Panel Control unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %

e Pekerjaan Sipil , Fabrikasi dan Perpipaan


1 Pekerjaan Sipil STP pondasi ( Tanki STP ) dan Roofing unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
2 Tanki Grease Trapp Volume 2 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
3 Tanki Equalisasi Volume 6 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
4 Tanki Anoxid Volume 6 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
5 Tanki Aerasi Volume 30 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
6 Tanki Sedimentasi Volume 7,85 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
7 Tanki Pump pitch Volume 1 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
8 Tanki Clear Water Volume 2 M3 Material FRP unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
9 Sand Filter Cap. 1,45 M3/H, Material FRP, Dia 400 mm x 1200mm (H) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
10 Carbon Filter Cap. 1,45 M3/H, Material FRP, Dia 400 mm x 1200mm (H) unit 1.00 Err:508 Err:508 Err:508 Err:508 Err:508 Err:508 - Err:508 Err:508 - Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508 Err:508 Err:508 Err:508 Err:508

TOTAL Err:508 Err:508 Err:508 Err:508 Err:508

Samarinda, 10 November 2021


Dibuat Oleh :
Konsultan Pengawas
PT. GEOMAP INTERNATIONAL CONSULTANT

JOSZY ARIEF M, ST
Team Leader
KEGIATAN : PENETAPAN DAN PENYELENGGARAAN BANGUNAN GEDUNG UNTUK KEPENTINGAN STRATEGIS DAERAH PROVINSI
PEKERJAAN : PEMBANGUNAN GEDUNG RUMAH SAKIT KORPRI DI SAMARINDA
LOKASI : SAMARINDA
TAHUN PELAKSANAAN : 2021 KONTRAKTOR PELAKSANA
KONSULTAN PENGAWAS

PROGRES KEMAJUAN PEKERJAAN MINGGUAN

MINGGU KE 4450400.0000%
PERIODE 0.0000%

RENCANA: 26.315%
REALISASI : Err:508
DEVIASI : Err:508

REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

LINGKUP : PEKERJAAN SITE DEVELOPMENT


I PEKERJAAN TANAH

1 Urugan Tanah m3 Err:508 Err:508 %


- Urugan Tanah m3 Err:508 Err:508 %
2 Pekerjaan LPJU 100 w Solar Cell (Tiang 7m) Ttk Err:508 Err:508 %
SUB TOTAL PEKERJAAN TANAH Err:508

II PEK. JALAN BETON


1 Lantai Kerja m2 Err:508 Err:508 %
2 Cor Jalan Beton K. 250 m3 Err:508 Err:508 %
3 Besi tulangan Wire mesh M8 1 lapis Kg Err:508 Err:508 %
4 Bekisting m2 Err:508 Err:508 %
6 Joint sealen/Aspal setiap jarak 4 m m Err:508 Err:508 %
SUB TOTAL PEK. JALAN BETON Err:508

III PEK. PASANGAN PAVING BLOCK


1 Pek. Pasir Urug t. 10 cm m3 0.0000% 0.00 %
2 Paving block (incld pasir urug) m2 0.0000% 0.00 %
3 Kansteen m 0.0000% 0.00 %
4 Cat kansteen m2 0.0000% 0.00 %
SUB TOTAL PEK. PASANGAN PAVING BLOCK 0.0000%

IV PEK. DRAINASE AIR HUJAN SISI BANGUNAN


1 Pek. Galian Tanah m3 Err:508 Err:508 %
2 Bak kontrol uk 50x50x60 cm + Tutup Bh Err:508 Err:508 %
3 Pipa PVC type AW diameter 10 inchi m Err:508 Err:508 %
SUB TOTAL PEK. DRAINASE AIR HUJAN SISI BANGUNAN Err:508

V PEK. TURAP / DINDING PENAHAN TANAH KELILING


1 Pas. Bowplank m Err:508 Err:508 %
2 Pasangan Batu Gunung camp. 1:4 m3 Err:508 Err:508 Err:508 %
- Pasangan Batu Gunung camp. 1:4 m3 Err:508 Err:508 Err:508 %
3 Cerucuk kayu 10/10. 4 m. Ttk Err:508 Err:508 Err:508 %
- Cerucuk kayu 10/10. 4 m. Ttk Err:508 Err:508 Err:508 %
SUB TOTAL PEK. TURAP / DINDING PENAHAN TANAH KELILING Err:508

VI PEK. PAGAR KELILING


1 Galian Tanah m3 35.68 Err:508 Err:508 %
2 Beton Pondasi Pagar uk 25x25x50 cm m3 0.0000% 0.00 %
- Beton Pondasi Pagar uk 25x25 cm m3 Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
3 Pembesian kg 1,614.41 Err:508 Err:508 %
4 Bekisting Pondasi m2 79.71 Err:508 Err:508 %
5 Finishing Pondasi unit Err:508 Err:508 %
6 Pagar BRC tinggi 190 (+ Tiang) m Err:508 Err:508 %
SUB TOTAL PEK. PAGAR KELILING Err:508

VII PEK. JEMBATAN MASUK DAN KELUAR


1 Galian Tanah m3 0.0000% 0.00 %
2 Urugan Pasir m3 0.0000% 0.00 %
3 Lantai Kerja m2 0.0000% 0.00 %
4 Beton m3 0.0000% 0.00 %
5 Beton K.300 m3 Err:508 Err:508 %
5 Pembesian Kg 0.0000% 0.00 %
7 Besi Beton Ulir Kg Err:508 Err:508 %
6 Bekisting m2 Err:508 Err:508 %
SUB TOTAL PEK. JEMBATAN MASUK DAN KELUAR Err:508

VIII PEKERJAAN BANGUNAN GENSET


Pekerjaan Dasar
1 Lantai Kerja T=5cm m3 Err:508 Err:508 %
2 Cor Rabat T=20 cm 1:2:3 m3 Err:508 Err:508 %
3 Cerucuk ulin 8/8 p. 2m m1 Err:508 Err:508 %
Pekerjaan Ruang Genset
4 Kolom Besi Hollow 4x4 cm m1 Err:508 Err:508 %
5 Pagar Besi Hollow 2x4 cm (+ pintu) m2 Err:508 Err:508 %
6 Atap Spandek (+ rangka besi hollow 4x4) m2 Err:508 Err:508 %
SUB TOTAL PEKERJAAN BANGUNAN GENSET Err:508

IX PEKERJAAN RUANG ZENAZAH


Pekerjaan Dasar
1 Lantai Kerja T=5cm m3 Err:508 Err:508 %
2 Cor Rabat T=20 cm 1:2:3 m3 Err:508 Err:508 %
3 Cerucuk ulin 8/8 p. 2m m1 Err:508 Err:508 %
Pekerjaan Ruang
4 Kolom Praktis m3 Err:508 Err:508 %
5 Dinding Bata m2 Err:508 Err:508 %
6 Pek. Ringbalk 8/12 m3 Err:508 Err:508 %
7 Pek. Atap Spandek (+ rangka baja ringan) m2 Err:508 Err:508 %
8 Pas. Plafond Gypsum 9 mm + Rangka Hollow 4/4 cm m2 Err:508 Err:508 %
9 Pek. Plesteran m2 Err:508 Err:508 %
10 Pek. Acian m2 Err:508 Err:508 %
11 Pek. Pengecatan m2 Err:508 Err:508 %
12 Pas. Keramik Lantai m2 Err:508 Err:508 %
13 Pasangan Pintu Dobel unit Err:508 Err:508 %
14 Pas. Titik Lampu titik Err:508 Err:508 %
15 Pas. Stop Kontak titik Err:508 Err:508 %
16 Pas. Wastafel + pipa set Err:508 Err:508 %
17 Pas. Kran + pipa 1/2" set Err:508 Err:508 %
18 Pas. Floor Drain + pipa 3" set Err:508 Err:508 %
19 Pas. Exaust Van set Err:508 Err:508 %
20 Pas. AC 1 PK set Err:508 Err:508 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

X PEKERJAAN TAMAN
1 Tanah Humus/ Top soil m3 0.0000% 0.00 %
2 Gebalan Rumput m2 0.0000% 0.00 %
3 Pohon Tabebuya T. 1,5 m Phn Err:508 Err:508 %
4 Palm Putri T. 2m Phn 0.0000% 0.00 %
SUB TOTAL PEKERJAAN RUANG ZENAZAH Err:508

LINGKUP : PEKERJAAN STRUKTUR


A PEKERJAAN PERSIAPAN
1. Pek. Pagar Sementara m2 Err:508 Err:508 Err:508 %
2. Pek. Boring Titik Err:508 Err:508 %
3. Pek. Pengukuran & Pemasangan Bouwplank m2 0.0000% 0.00 %
Pek. Pengukuran & Pemasangan Bouwplank m Err:508 Err:508 %
4. Pek.Test Pile Driving Analyzer ( PDA ) Titik Err:508 Err:508 %
5. Mobilisasi dan Demobilisasi Alat Ls Err:508 Err:508 %
SUB TOTAL PEKERJAAN PERSIAPAN Err:508

B PENERAPAN SMKK
3.1 Penyiapan RKK
3.1.1 Pembuatan dokumen RKK Set Err:508 Err:508 %
3.1.2 Pembuatan prosedur dan instruksi kerja, dan Set Err:508 Err:508 %
3.1.3 Penyiapan formulir Set Err:508 Err:508 %
3.2 Sosialisasi, Promosi, dan Pelatihan
3.2.1 Induksi K3 (Safety Induction) Org Err:508 Err:508 %
3.2.2 Pengarahan K3 (Safety Briefing) Org Err:508 Err:508 %
3.2.3 Pertemuan mengenai keselamatan (Safety Meeting, Org Err:508 Err:508 %
Safety Talk, dan Tool Box Meeting)
3.2.4 Pelatihan K3 Org Err:508 Err:508 %
3.2.5 Sosialisasi HIV/AIDS Org Err:508 Err:508 %
3.2.6 Simulasi K3 Org Err:508 Err:508 %
3.2.7 Spanduk (Banner) Lb Err:508 Err:508 %
3.2.8 Poster, dan Lb Err:508 Err:508 %
3.2.9 Papan informasi K3 Bh Err:508 Err:508 %
3.3 Alat Pelindung Kerja dan Alat Pelindung Diri
3.3.1 APK (Alat Pelindung Kerja)
3.3.1.1 Jaring pengaman (Safety Net) Ls Err:508 Err:508 %
3.3.1.2 Tali keselamatan (Life Line) Ls Err:508 Err:508 %
3.3.1.3 Penahan jatuh (Safety Deck) Ls Err:508 Err:508 %
3.3.1.4 Pagar pengaman (Guard Railling) Ls Err:508 Err:508 %
3.3.1.5 Pembatas area (Restricted Area) Ls Err:508 Err:508 %
3.3.1.6 Pelindung jatuh (Fall Arrester), dan Bh Err:508 Err:508 %

3.3.2 APD (Alat Pelindung Diri)


3.3.2.1 Helm pelindung (Safety Helmet) Bh Err:508 Err:508 %
3.3.2.2 Pelindung mata (Goggles, Spectacles) Psg Err:508 Err:508 %
3.3.2.3 Tameng muka (Face Shield) Bh Err:508 Err:508 %
3.3.2.5 Pelindung Telinga (Ear Plug, Ear Muff) Psg Err:508 Err:508 %
3.3.2.6 Pelindung pernafasan dan mulut (Masker) Bh Err:508 Err:508 %
3.3.2.7 Sarung tangan (Safety Gloves) Psg Err:508 Err:508 %
3.3.2.8 Sepatu keselamatan (Safety Shoes) Psg Err:508 Err:508 %
3.3.2.9 Penunjang seluruh tubuh (Full Body Harness) Bh Err:508 Err:508 %
3.3.2.10Rompi keselamatan (Safety Vest) Bh Err:508 Err:508 %
3.3.2.11Celemek (Apron/Coveralls) Bh Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
3.4 Asuransi dan Perijinan
3.4.1 Asuransi Ls Err:508 Err:508 %
3.4.2 Surat Izin Laik Operasi (SILO) Ls Err:508 Err:508 %
3.4.3 Sertifikat Kompetensi Operator yang diterbitkan oleh Lb/alat Err:508 Err:508 %
lembaga/oinstansi yang berwenang
3.4.4 Surat Pengesahan Organisasi K3 (P2K3) Ls Err:508 Err:508 %
3.4.5 Perizinan terkait lingkungan kerja Ls Err:508 Err:508 %
3.5 Personel Kesalamatan Konstruksi
3.5.1 Ahli K3 Konstruksi dan Petugas K3 Konstruksi OB Err:508 Err:508 %
3.5.2 Petugas tanggap darurat OB Err:508 Err:508 %
3.5.3 Petugas P3K OB Err:508 Err:508 %
3.5.4 Petugas pengatur laul lintas (Flagman) OB Err:508 Err:508 %
3.5.5 Tenaga paramedis dan kesehatan OB Err:508 Err:508 %
3.5.6 Petugas kebersihan lingkungan OB Err:508 Err:508 %
3.6 Fasilitas Sarana, Prasarana dan Alat Kesehatan
3.6.1 Peralatan P3K ( Kotak P3K, tandu) Ls Err:508 Err:508 %
3.6.2 Ruang P3K (tempat tidur pasien, tabung oksigen, stateskop, Ls Err:508 Err:508 %
timbangan berat badan, tensi meter dan lain - lain)
3.6.3 Peralatan pengasapan (Fogging) Bh Err:508 Err:508 %
3.6.4 Obat pengasapan kali Err:508 Err:508 %
3.7 Rambu - rambu yang diperlukan
3.7.1 Rambu petunjuk Bh Err:508 Err:508 %
3.7.2 Rambu larangan Bh Err:508 Err:508 %
3.7.3 Rambu peringatan Bh Err:508 Err:508 %
3.7.4 Rambu kewajiban Bh Err:508 Err:508 %
3.7.5 Rambu informasi Bh Err:508 Err:508 %
3.7.6 Rambu pekerjaan sementara Bh Err:508 Err:508 %
3.7.7 Jalur evakuasi (Escape Route) Ls Err:508 Err:508 %
3.7.8 Tongkat pengatur lalu lintas (Warning Lights Stick) Bh Err:508 Err:508 %
3.7.9 Kerucut lalu lintas (Traffic Cone) Bh Err:508 Err:508 %
3.7.10 Lampu putar (Rotary Lamp) Bh Err:508 Err:508 %
3.7.11 Lampu selang lalu lintas Ls Err:508 Err:508 %
3.8 Kegiatan dan Peralatan terkait dengan Pengandalian Risiko
Keslamatan Konstruksi
3.8.1 Pemeriksaan dan pengujian peralatan Ls Err:508 Err:508 %
3.8.2 Alat Pemadam Api Ringan (APAR) Bh Err:508 Err:508 %
3.8.3 Sirine Bh Err:508 Err:508 %
3.8.4 Bendera K3 Bh Err:508 Err:508 %
3.8.5 Lampu darurat (Emergency Lamp) Bh Err:508 Err:508 %
3.8.6 Pemeriksaan lingkungan kerja
- Limbah B3 Ls Err:508 Err:508 %
- Polusi suara Ls Err:508 Err:508 %
3.8.7 Pembuatan Kartu Identitas Pekerja (KIP) Org Err:508 Err:508 %
3.8.8 Program inspeksi dan audit Ls Err:508 Err:508 %
3.8.9 Pelaporan dan penyelidikan insiden Ls Err:508 Err:508 %
SUB TOTAL PENERAPAN SMKK Err:508

C PEKERJAAN STRUKTUR
C.1 PEKERJAAN STRUKTUR BAWAH
C.1.1 PEKERJAAN TANAH & URUGAN
1 Pek.Galian Tanah Biasa Sedalam 1 m
Galian Pondasi Pile Cap m³ Err:508 Err:508 %
Galian Pasangan Pondasi Bt. Gunung m³ Err:508 Err:508 %
Galian Parit m³ Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
2 Pek.Pengurugan Pasir
Urugan Pasir Bawah Pondasi Pile Cap T-10 cm m³ Err:508 Err:508 %
Urugan Pasir Bawah Pasangan Pondasi Bt. Gunung T-10 cm m³ 0.0000% 0.00 %
Urugan Pasir Bawah Parit T-10 cm m³ Err:508 Err:508 %
3 Pek.Lantai Kerja
Lantai Kerja Bawah Pondasi Pile Cap T-5 cm m³ Err:508 Err:508 %
Lantai Kerja Bawah Parit Keliling Bangunan T-5 cm m³ Err:508 Err:508 %
4 Pek.Pembuatan Parit Keliling + Plesteran + Acian,1pc : 2pp T-15 cm m² Err:508 Err:508 %
5 Pek.Pembuatan Bak Kontrol Unit Err:508 Err:508 %

C.1.2 PEKERJAAN SUB.STRUKTUR.


1 Pengadaan dan Pemancangan Spun Pile, Ø 40 m¹ Err:508 Err:508 %
2 Pengadaan dan Pemancangan Spun Pile, Ø 30 m¹ Err:508 Err:508 %
3 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m m¹ 0.0000% 0.00 %
Cerucuk kayu 10/10. 4 m. Ttk Err:508 Err:508 %
Cerucuk ulin 8/8 p. 2m Ttk Err:508 Err:508 %
4 Pengadaan dan Pemancangan Ulin □ 10 x 10 x 1 m m¹ 0.0000% 0.00 %
5 Pengelasan Sambungan Tiang Pancang Ø 40 m¹ Err:508 Err:508 %
6 Pengelasan Sambungan Tiang Pancang Ø 30 m¹ Err:508 Err:508 %
7 Pemotongan Kepala Tiang Pancang Ttk Err:508 Err:508 %
8 Pondasi Type A. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type A. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
9 Pondasi Type B. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type B. 260 x 260 x 67 cm ( Sesuai gambar )
Beton K.300 m³ Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
10 Pondasi Type C. 2600 x 2600 x 750 cm - 670 cm
- Pondasi Type C.
Beton K.300 m³ Err:508 Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 Err:508 %
11 Pondasi Type D. 2200 x 2200 x 750 cm
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Pondasi m² 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
12 Pondasi Type E. 800 x 800 x 500 cm
- Pondasi Type E. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
13 Pondasi Type E. 800 x 800 x 500 cm
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Pondasi m² 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
14 Pondasi Type E1. 80 x 80 x 50 cm ( Sesuai gambar )
Beton K.300 m³ Err:508 Err:508 %
Bekisting Pondasi m² Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
15 Pek. Pasangan Pondasi Bt. Gunung Camp. 1sp : 4pp m³ Err:508 Err:508 %
16 Pek. Pasangan Batu Kosong (Anstamping) m³ Err:508 Err:508 %
SUB TOTAL (C1) PEKERJAAN STRUKTUR BAWAH Err:508
C.2 PEKERJAAN STRUKTUR ATAS.
C.2.1 PEKERJAAN LANTAI. 1
1 Pek.Kolom Pedestal.500 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
2 Pek.Kolom Pedestal.400 x 600.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
3 Pek.Kolom Pedestal.400 x 400.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Kolom m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
4 Pek.Kolom Pedestal 200 x 300
Beton K.300 m³ Err:508 Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 Err:508 %
5 Pek.Kolom Pedestal.250 x 250.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
6 Pek,Balok Suspended f S1.300 x 600.
Beton K.300 m³ 15.52 Err:508 Err:508 %
Bekisting Balok m² 267.88 Err:508 Err:508 %
Besi Beton Polos Kg 2,186.72 Err:508 Err:508 %
Besi Beton Ulir Kg 5,363.40 Err:508 Err:508 %
7 Pek,Balok Suspended S2.300 x 500.
Beton K.300 m³ 8.09 Err:508 Err:508 %
Bekisting Balok m² 107.94 Err:508 Err:508 %
Besi Beton Polos Kg 918.30 Err:508 Err:508 %
Besi Beton Ulir Kg 1,772.89 Err:508 Err:508 %
8 Pek,Balok Suspended S3.250 x 400.
Beton K.300 m³ 9.73 Err:508 Err:508 %
Bekisting Balok m² 233.55 Err:508 Err:508 %
Besi Beton Polos Kg 2,072.48 Err:508 Err:508 %
Besi Beton Ulir Kg 4,597.63 Err:508 Err:508 %
9 Pek,Balok Suspended S4.200 x 350.
Beton K.300 m³ 4.32 Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 Err:508 %
Besi Beton Polos Kg 1,171.54 Err:508 Err:508 %
Besi Beton Ulir Kg 2,509.34 Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
10 Pek,Balok Suspended S5.150 x 200.
Beton K.300 m³ 0.61 Err:508 Err:508 %
Bekisting Balok m² 40.76 Err:508 Err:508 %
Besi Beton Polos Kg 609.88 Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² 189.12 Err:508 Err:508 %
Besi Beton Polos Kg 1,095.38 Err:508 Err:508 %
Besi Beton Ulir Kg 3,429.94 Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Kolom m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Kolom K4.250 x 250 Rump.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
16 Pek.Balok B5.200 x 300. Bordes Tangga )
Pek.Balok B5.200 x 300. Bordes Tangga & Ramp )
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
17 Pek.Balok Latai.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
18 Pek.Plat Lantai T-15 cm
Beton K.300 m³ 117.36 Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 1,043.24 Err:508 Err:508 %
Besi Beton Polos Kg 17,207.59 Err:508 Err:508 %
19 Pek.Plat Rump T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Tangga m² 0.0000% 0.00 %
Bekisting Plat Ramp m² Err:508 Err:508 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
20 Pek.Plat Tangga T-12 cm (Lt.1 - Lt.2)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Tangga m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
21 Pek.Rabat Keliling Bangunan T-10 cm
Beton K.175 m³ 0.0000% 0.00 %
Bekisting Plat m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
22 Pek.Ruangan Pit Lift
Beton K.300 m³ Err:508 Err:508 %
Bekisting m² Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
Pengadaan dan Pemancangan Ulin □ 10 x 10 x 4 m Ttk Err:508 Err:508 %
23 Pasang Konstruksi Baja WF 200.100.5,5.8 Kg Err:508 Err:508 %
24 Proteksi Anti Karat / Rust proof pada rangka baja m² Err:508 Err:508 %
25 Pek. Screeding tebal 3 cm Untuk Pit Lift m² Err:508 Err:508 %
26 Pek. waterproofing (Coating) Pit Lift m² Err:508 Err:508 %
C.2.2 PEKERJAAN LANTAI. 2
1 Pek.Balok B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
2 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
3 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Balok m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
4 Pek.Balok B2.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Balok B2.250 x 500. R. Gas Medic
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
5 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
6 Pek.Balok B3.250 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
7 Pek.Balok B4.200 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Balok B4.200 x 400. R.Gas Medic
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
8 Pek.Balok B5.200 x 300.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Balok B5.200 x 300. R.Gas Medic
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
9 Pek.Balok B6.150 x 200.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
10 Pek.Balok Latai, 110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
11 Pek.Kolom K1.500 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
12 Pek.Kolom K2.400 x 600.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
13 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Kolom m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
14 Pek.Kolom K4.250 x 250.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Kolom K4.250 x 250. R.Gas Medic
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
15 Pek.Kolom KP.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
16 Pek.Plat Lantai T-12 cm
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg Err:508 0.00 %
- Pek.Plat Lantai T-12 cm R.Gas Medic
Beton K.300 m³ Err:508 0.00 %
Bekisting Plat Lantai (Bondeks) m² Err:508 0.00 %
Besi Tulangan Wire Mesh M8 2 lapis Kg Err:508 0.00 %
17 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Lantai m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
18 Pek.Plat Rump T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Tangga m² Err:508 Err:508 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg Err:508 Err:508 %
19 Pek.Plat Tangga T-12 cm (Lt.2 - Lt.3)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Tangga m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %

C.2.3 PEKERJAAN LANTAI. 3


1 Pek.Kolom K1.500 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
2 Pek.Kolom K2.400 x 600.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
3 Pek.Kolom K3.400 x 400.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Kolom m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
4 Pek.Kolom K4.250 x 250.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
5 Pek.Kolom KP.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
6 Pek.Balok B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
7 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
8 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Balok m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
9 Pek.Balok B2.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
10 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
11 Pek.Balok B3.250 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
12 Pek.Balok B4.200 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
13 Pek.Balok B5.200 x 300.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
14 Pek.Balok B6.150 x 200.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
15 Pek.Balok Latai.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
16 Pek.Plat Lantai T-12 cm
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Kg 0.0000% 0.00 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
17 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Plat Lantai m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
18 Pek.Plat Lantai T-12 cm (Watherprofing)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Lantai m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Err:508 Err:508 %
19 Pek.Plat Tangga T-12 cm (Lt.3 - Lt.DAK)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Tangga m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %

C.3 PEKERJAAN RING BALOK RL. 1


1 Pek.Balok B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
2 Pek.Balok kantilever B1.300 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
3 Pek.Balok Sirip.300 x 500.
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Balok m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Beton Ulir Kg 0.0000% 0.00 %
4 Pek.Balok B2.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
5 Pek.Balok kantilever B1.250 x 500.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
5 Pek.Balok B3.250 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
- Pek.Balok Kantilever B3.250 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
6 Pek.Balok B4.200 x 400.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
7 Pek.Balok B5.200 x 300.
Beton K.300 m³ Err:508 Err:508 %
Bekisting Balok m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
Besi Beton Ulir Kg Err:508 Err:508 %
8 Pek.Kolom KP.110 x 110.
Beton K.100 m³ Err:508 Err:508 %
Bekisting Kolom m² Err:508 Err:508 %
Besi Beton Polos Kg Err:508 Err:508 %
9 Pek.Plat Lantai T-12 cm (Watherprofing)
Beton K.300 m³ Err:508 Err:508 %
Bekisting Plat Lantai (Bondeks) m² Err:508 Err:508 %
Besi Beton Polos Kg 0.0000% 0.00 %
Besi Tulangan Wire Mesh M8 2 Lapis Kg Err:508 Err:508 %
10 Pek.Plat Lantai Canopy T-10 cm
Beton K.300 m³ 0.0000% 0.00 %
Bekisting Plat Lantai m² 0.0000% 0.00 %
Besi Beton Polos Kg 0.0000% 0.00 %
SUB TOTAL (C2) PEKERJAAN STRUKTUR ATAS Err:508

LINGKUP PEKERJAAN : ARSITEKTUR


I PEKERJAAN PERSIAPAN
1 Pek. Direksikeet m² Err:508 Err:508 %
2 Pembersihan Awal dan Akhir Ls Err:508 Err:508 %
SUB TOTAL PEKERJAAN PERSIAPAN Err:508

II PEK. PASANGAN DINDING BATA


1 Pek. Dinding Trasram 1:3 m² Err:508 Err:508 %
2 Pek. Dinding batu bata 1:5 m² Err:508 Err:508 %
3 Pek. Plesteran 1:5 m² Err:508 Err:508 %
4 Pek. Plesteran Dinding 1:3 m² Err:508 Err:508 %
6 Pek. Acian Dinding m² Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN DINDING BATA Err:508

III PEK. PASANGAN DINDING KHUSUS


1 Pek. Dinding Gypsum + Rangka m² Err:508 Err:508 %
2 Pek. Dempul Dinding Gypsum m² Err:508 Err:508 %
3 Pek. Dinding Timbal 2mm + Rangka R. OK m² Err:508 Err:508 %
4 Pek. Dinding Timbal 2mm + Rangka R. Radiologi m² Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN DINDING KHUSUS Err:508

IV PEK. PASANGAN LANTAI


1 Pek. Rolag Bata Teras m² Err:508 Err:508 %
2 Pek. Lantai Granit 60 x 60 cm Interior Lt. 01 m² Err:508 Err:508 %
3 Pek. Lantai Granit 60 x 60 cm Interior Lt. 02 m² Err:508 Err:508 %
4 Pek. Lantai Granit 60 x 60 cm Interior Lt. 03 m² Err:508 Err:508 %
5 Pek. Lantai Granit 60 x 60 cm Eksterior m² Err:508 Err:508 %
6 Pas. Lantai Keramik 40x40 Tangga Utama m² Err:508 Err:508 %
7 Pas. Lantai Bordes Keramik 40x40 Tangga Utama m² Err:508 Err:508 %
7 Pas. Lantai Keramik 40x40 Tangga Darurat + Steepnosing m² Err:508 Err:508 %
7 Pas. LantaiBordes Keramik 40x40 Tangga Darurat m² Err:508 Err:508 %
8 Pas. Keramik Lantai 20x20 KM/WC LT.01 m² Err:508 Err:508 %
9 Pas. Keramik Lantai 20x20 KM/WC LT.02 m² Err:508 Err:508 %
10 Pas. Keramik Lantai 20x20 KM/WC LT.03 m² Err:508 Err:508 %
11 Pas. Dinding Keramik 20x20 KM/WC LT.01 m² Err:508 Err:508 %
12 Pas. Dinding Keramik 20x20 KM/WC LT.02 m² Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
13 Pas. Dinding Keramik 20x20 KM/WC LT.03 m² Err:508 Err:508 %
14 Pas. List Dinding Keramik 10x20 KM/WC m² Err:508 Err:508 %
15 Pek. Rabat Lantai Luar ( Plat Teras ) t=7cm m³ Err:508 Err:508 %
16 Pek. Lantai Vinyl t = 3mm LT. 01 m² Err:508 Err:508 %
17 Pek. Lantai Vinyl t = 3mm LT. 02 m² Err:508 Err:508 %
18 Pek. Lantai Vinyl t = 3mm LT. 03 m² Err:508 Err:508 %
SUB TOTAL PEK. PASANGAN LANTAI Err:508

V PEK. KUSEN ALLUMUNIUM


1 Pek. Kosen Pintu P1 m¹ Err:508 Err:508 %
2 Pek. Kosen Pintu P2 m¹ Err:508 Err:508 %
3 Pek. Kosen Pintu P3 m¹ Err:508 Err:508 %
4 Pek. Kosen Pintu P4 m¹ Err:508 Err:508 %
5 Pek. Kosen Pintu P5 m¹ Err:508 Err:508 %
6 Pek. Kosen Pintu P6 m¹ Err:508 Err:508 %
7 Pek. Kosen Pintu PK1 m¹ Err:508 Err:508 %
8 Pek. Kosen Pintu PG1 m¹ Err:508 Err:508 %
9 Pek. Kosen Pintu PG2 m¹ Err:508 Err:508 %
10 Pek. Kosen Pintu PG3 m¹ Err:508 Err:508 %
15 Pek. Kosen PD1 m¹ Err:508 Err:508 %
16 Pek. Kosen PD2 m¹ Err:508 Err:508 %
17 Pek. Kosen PD3 m¹ Err:508 Err:508 %
18 Pek. Kosen K1 m¹ Err:508 Err:508 %
19 Pek. Kosen K2 m¹ Err:508 Err:508 %
20 Pek. Kosen K3 m¹ Err:508 Err:508 %
21 Pek. Kosen K4 m¹ Err:508 Err:508 %
22 Pek. Kosen K4' m¹ Err:508 Err:508 %
23 Pek. Kosen K4'' m¹ Err:508 Err:508 %
24 Pek. Kosen K5 m¹ Err:508 Err:508 %
25 Pek. Kosen K5' m¹ Err:508 Err:508 %
26 Pek. Kosen K5'' m¹ Err:508 Err:508 %
27 Pek. Kosen K6 m¹ Err:508 Err:508 %
28 Pek. Kosen K6' m¹ Err:508 Err:508 %
29 Pek. Kosen K7 m¹ Err:508 Err:508 %
30 Pek. Kosen K8 m¹ Err:508 Err:508 %
31 Pek. Kosen K9 m¹ Err:508 Err:508 %
32 Pek. Kosen K10 m¹ Err:508 Err:508 %
33 Pek. Kosen Jendela J1 m¹ Err:508 Err:508 %
34 Pek. Kosen Jendela J2 m¹ Err:508 Err:508 %
35 Pek. Kosen Jendela J3 m¹ Err:508 Err:508 %
36 Pek. Kosen Jendela J4 m¹ Err:508 Err:508 %
38 Pek. Pas. Kaca 5 mm m² Err:508 Err:508 %
39 Pek. Pas. Tempered Glass 8 mm m² Err:508 Err:508 %
40 Pek. Pas. Tempered Glass 12 mm m² Err:508 Err:508 %
SUB TOTAL PEK. KUSEN ALLUMUNIUM Err:508

VI PEK. PINTU / JENDELA / VENTILASI


1 Pek Daun Pintu Bengkirai m² Err:508 Err:508 %
2 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L=140cm m² Err:508 Err:508 %
3 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L=120cm m² Err:508 Err:508 %
4 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L = 90 cm m² Err:508 Err:508 %
5 Pek. Daun Pintu Double TeakWood Fin. HPL + Aksesoris L = 80 cm m² Err:508 Err:508 %
6 Pek. Pintu PVC Toilet Type 1 m² Err:508 Err:508 %
7 Pek. Pintu PVC Toilet Type 2 m² Err:508 Err:508 %
8 Pek. Pas. Pintu Kaca Tempered + Aksesoris Bh Err:508 Err:508 %
9 Pek. Frame Allumunium Daun Jendela m² Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
10 Pek. Pintu Operasi L = 160 terpasang Bh Err:508 Err:508 %
11 Pek. Pintu Operasi (Pintu Hermatik) L = 140 terpasang Bh Err:508 Err:508 %
12 Pek. Pintu Operasi L = 90 terpasang Bh Err:508 Err:508 %
SUB TOTAL PEK. PINTU / JENDELA / VENTILASI Err:508

VII PEK. PLAFOND


1 Pas. Plafond Gypsum 9 mm + Rangka Hollow 4/4 cm m² Err:508 Err:508 %
2 Pas. Plafond GRC 6 mm + Rangka Hollow 4/4 cm m² Err:508 Err:508 %
3 Pas. List Plafond Gipsum m²
SUB TOTAL PEK. PLAFOND Err:508

VIII PAS. KUNCI DAN ALAT PENGGANTUNG


1 Pas. Kunci Pintu 2 Slaag Stainless Bh Err:508 Err:508 %
2 Pas. Handle Pintu Bh Err:508 Err:508 %
2 Pas. Handle Pintu Geser Bh Err:508 Err:508 %
3 Pas. Door Stopper Bh Err:508 Err:508 %
4 Pas. Kunci Tanam Bh Err:508 Err:508 %
5 Pas. Sliding Rell Bh Err:508 Err:508 %
6 Pas. Bottom Guide Bh Err:508 Err:508 %
8 Pas. Door roller Bh Err:508 Err:508 %
9 Pas. Grendel Jendela Bh Err:508 Err:508 %
10 Pas. Engsel Pintu Psg Err:508 Err:508 %
11 Pas. Floor Hinge Psg Err:508 Err:508 %
12 Pas. Engsel Jendela Psg Err:508 Err:508 %
13 Pas. Hak Kait Angin Psg Err:508 Err:508 %
14 Pas. Tarikan jendela Psg Err:508 Err:508 %
SUB TOTAL PAS. KUNCI DAN ALAT PENGGANTUNG Err:508

IX PEK. PENGECATAN
1 Pek. Cat Dinding Tembok Luar m² Err:508 Err:508 %
2 Pek. Cat Dinding Tembok Dalam m² Err:508 Err:508 %
3 Pek. Cat Dinding Gypsum m² Err:508 Err:508 %
4 Pek. Cat Daun Pintu Bengkirai m² Err:508 Err:508 %
5 Pek. Cat Dinding Epoxy m² Err:508 Err:508 %
6 Pek. Cat Plafond m² Err:508 Err:508 %
SUB TOTAL PEK. PENGECATAN Err:508

X PEK. SANITASI
1 Pek. Pasangan Wastafel Lengkap Set Err:508 Err:508 %
2 Pek. Pasangan Urinoir Set Err:508 Err:508 %
3 Pek. Pasangan Closet Duduk Set Err:508 Err:508 %
4 Pek. Pasangan Closet Jongkok set Err:508 Err:508 %
5 Pasangan Kran Tembok Unit Err:508 Err:508 %
6 Pasangn Jet Washer Unit Err:508 Err:508 %
7 Pasangn Hand Shower Unit Err:508 Err:508 %
8 Floor Drain bh Err:508 Err:508 %
SUB TOTAL PEK. SANITASI Err:508

XI PEKERJAAN LAINYA
1 Pek. Railling Tangga Umum terpasang m' Err:508 Err:508 %
2 Pek. Hand Railling Koridor m' Err:508 Err:508 %
3 Pek. Railling Teras Luar terpasang m' Err:508 Err:508 %
4 Pek. Pas. Sunblas Kaca m² Err:508 Err:508 %
5 Pas.Grab Bar Toilet Disable Bh Err:508 Err:508 %
6 Pas. Scrub Up R. OK 2 Person Bh Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
7 Pas. Spoel Hoek Bh Err:508 Err:508 %
8 Pas. Pekerjaan Tangga Darurat Rangka Baja Set Err:508 Err:508 %
9 Pek. Tulisan "Rumah Sakit Korpri" bh Err:508 Err:508 %
SUB TOTAL PEKERJAAN LAINYA Err:508

LINGKUP PEKERJAAN : MEEP


A PEKERJAAN ELEKTRIKAL
1 PERALATAN UTAMA
1 GENSET (Generator Set) unit Err:508 Err:508 %
Kap : 630 KVA
Type : Silent
2 Tansformator unit Err:508 Err:508 %
Kap : 630 KVA
Type : Indoor
3 Tangki Bulanan unit Err:508 Err:508 %
kap : 5000 ltr
Termasuk pondasi/dudukan tangki
4 Tanki Solar Harian termasuk pompa solar dan Instalasinya lot Err:508 Err:508 %
5 Cubicle Incoming LBS 630A unit Err:508 Err:508 %
6 Cubicle Outgoing LBS 630A with Fuse unit Err:508 Err:508 %
5 Grounding Trafo, Tangki solar, Cubicle, Genset) lot Err:508 Err:508 %
PENYAMBUNGAN LISTRIK PLN KAP. 555 KVA
1 Biaya Pasang Baru VA Err:508 Err:508 %
2 Uang Jaminan Langganan (UJL) VA Err:508 Err:508 %
3 Sertifikasi Laek Operasi (SLO) VA Err:508 Err:508 %

PEKERJAAN KABEL FEEDER


a Kabel TM 20 KV dari OutGoing (Gardu PLN) ke:
1 Cubicle Incoming NA2XSEY 1c x 150 mm2 (Gardu Pelanggan) m' Err:508 Err:508 %
b Kabel TM 20 KV dari OutGoing Pelanggan ke:
2 Transformator 630 KVA NA2XSEY 1c x 150 mm2 m' Err:508 Err:508 %
c Dari Transformator 630 KVA ke :
1 Panel ATS (di R.Genset) NYY 1c x 240 mm2 m' Err:508 Err:508 %
d Dari Genset 500 KVA ke :
1 Panel ATS (di R.Genset) NYY 1c x 240 mm2 m' Err:508 Err:508 %
e Dari Panel ATS ke :
1 Panel LVMDP (di Gedung) NYY 1c x 240 mm2 m' Err:508 Err:508 %
f Dari LVMDP ke:
1 PP AC LT-ATAP NYY 4x95 mm2 m' Err:508 Err:508 %
2 LP LT-1 NYY 4x16 mm2 m' Err:508 Err:508 %
3 LP LT-2 NYY 4x16 mm2 m' Err:508 Err:508 %
4 LP LT-3 NYY 4x16 mm2 m' Err:508 Err:508 %
5 PP Lift pasien FRC 4x16 mm2 m' Err:508 Err:508 %
6 PP Booster pump NYY 4x10 mm2 m' Err:508 Err:508 %
7 PP Power House NYY 4x10 mm2 m' Err:508 Err:508 %
8 PP Pompa Hydrant FRC 1cx35 mm2 m' Err:508 Err:508 %
9 PP Pompa Transfer Air Bersih NYY 4x10 mm2 m' Err:508 Err:508 %
10 Rak kabel ledder W 400 mm , H 100 mm m' Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA Err:508
2 PEKERJAAN LAMPU DAN INSTALASI
LANTAI 1
PANEL-PANEL
- PANEL LVMDP set Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- PANEL Capasitor bank kap 200 KVAR set Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- LP-LANTAI 1 set Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- Rak kabel ledder W 300 mm , H 100 mm m' Err:508 Err:508 %
- Kabel Tray W 300 mm , H 50 mm m' Err:508 Err:508 %
- Grounding lot Err:508 Err:508 %
LAMPU DAN ACCESSORIES
- LED PANEL SPARC 30120 32w/865 bh Err:508 Err:508 %
- LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh Err:508 Err:508 %
- FREZA G2 114 LED 7W/CW bh Err:508 Err:508 %
- GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LED BULB 10W E27 6500K 230V INDO bh Err:508 Err:508 %
- Exit Lamp LED 3 Watt bh Err:508 Err:508 %
- EXHAUST FAN 24 CDQN KDK 8" 105 CFM 18 W bh Err:508 Err:508 %
- Saklar Tunggal bh Err:508 Err:508 %
- Saklar Double bh Err:508 Err:508 %
- Stop Kontak 200W bh Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
SUB TOTAL LANTAI 1 Err:508
LANTAI 2
PANEL-PANEL
- PP-LANTAI 2 set Err:508 Err:508 %
• Komponen : ABB
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.1
- Kabel Tray W 300 mm , H 50 mm m' Err:508 Err:508 %
Grounding lot Err:508 Err:508 %
LAMPU DAN ACCESSORIES
LED PANEL SPARC 30120 32w/865 bh Err:508 Err:508 %
LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh Err:508 Err:508 %
LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh Err:508 Err:508 %
LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh Err:508 Err:508 %
FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh Err:508 Err:508 %
FREZA G2 114 LED 7W/CW bh Err:508 Err:508 %
GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LEDBULB 10W E27 6500K 230V INDO bh Err:508 Err:508 %
Exit Lamp LED 3 Watt bh Err:508 Err:508 %
Saklar Tunggal bh Err:508 Err:508 %
Saklar Double bh Err:508 Err:508 %
- Stop Kontak 200W bh Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
LANTAI 3
PANEL-PANEL
- PP-LANTAI 3 set Err:508 Err:508 %
• Komponen
• plat : 2,0 mm
• Color : RAL 7032
• Finishing : Powder Coating
• Sistem : 380/415 V, 3 PH, 50 Hz, 4 Wire
• Posisi : Lantai.2

- Kabel Tray W 300 mm , H 50 mm m' Err:508 Err:508 %


- Grounding lot Err:508 Err:508 %
LAMPU DAN ACCESSORIES
- LED PANEL SPARC 30120 32w/865 bh Err:508 Err:508 %
- LED PANEL SPARC 30120 32w/865 + BATT NICAD LED TCS EMG L12 8015NS-HB 200mAH bh Err:508 Err:508 %
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K bh
- LUNAR 210 LED SOUL-1 LED-S 12w/6500K BOX BATT NICAD HLX bh Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K bh Err:508 Err:508 %
- FREZA ART NRL-170 12w/6000K + BOX BATT NICAD HLX bh Err:508 Err:508 %
- FREZA G2 114 LED 7W/CW bh Err:508 Err:508 %
- GL PILAR DAIKO E27 DARK + BOHLAM PHILIPS LEDBULB 10W E27 6500K 230V INDO bh
- Exit Lamp LED 3 Watt bh Err:508 Err:508 %
- Saklar Tunggal bh Err:508 Err:508 %
- Saklar Double bh Err:508 Err:508 %
- Stop Kontak 200W bh Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
SUB TOTAL LANTAI 3 Err:508
3 RUANG GENSET
- MCB BOX 6 GROUP set Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh Err:508 Err:508 %
- Stop Kontak 200W bh Err:508 Err:508 %
- Saklar Tunggal : 2,0 mm bh Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa con: RAL 7032 ttk Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa co : Powder Coating ttk Err:508 Err:508 %
SUB TOTAL RUANG GENSET Err:508
4 RUANG POMPA
- MCB BOX 4 GROUP set Err:508 Err:508 %
- PLUTOS 20 LED-S 12w/6500K BOX BATT NICAD HLX bh Err:508 Err:508 %
- Stop Kontak 200W bh Err:508 Err:508 %
- Saklar Tunggal bh Err:508 Err:508 %
- Inslatasi penerangan NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
- Instalasi Stop Kontak NYM 3x2,5 mm2 dalam pipa conduit ttk Err:508 Err:508 %
SUB TOTAL RUANG POMPA Err:508

B PEKERJAAN TATA UDARA


LANTAI 1
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit Err:508 Err:508 %
Tipe
Kapasitas
Daya
Data List.
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' Err:508 Err:508 %
- FLEXIBLE DUCT 4'' m' Err:508 Err:508 %
- EAG (EXHAUST AIR grille) 150X150mm bh Err:508 Err:508 %
- AC Caseete (Split Duct) 4 PK + Hepa Filter System titik Err:508 Err:508 %
- AC Split Ducting 1- 2 PK titik Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 1 Err:508
LANTAI 2
PEKERJAAN TATA UDARA
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit Err:508 Err:508 %
Type: Ceiling Fan
Kapasitas: 75 Cfm
Daya: 35 w
Data List: 220 V/1 Ph/50 Hz
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' Err:508 Err:508 %
- Flexible Duct 4" m' Err:508 Err:508 %
- EAG (Exhaust Air grille) 150X150mm bh Err:508 Err:508 %
- AC Split Ducting titik Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 2 Err:508
LANTAI 3
PEKERJAAN TATA UDARA
1 Pekerjaaan Instalasi Exhaust Fan dan materian bantu Area toilet
- Exhaust Fan unit Err:508 Err:508 %
Type: Ceiling Fan %
Kapasitas: 75 Cfm %
Daya: 35 w %
Data List: 220 V/1 Ph/50 Hz %
- Intalasi Celling Fan NYM 3x2,5 mm2 dalam pipa conduit titik Err:508 Err:508 %
- Pipa Pvc AW dia. 4" m' Err:508 Err:508 %
- Flexible Duct 4" m' Err:508 Err:508 %
- EAG (Exhaust Air grille) 150X150mm bh Err:508 Err:508 %
- AC Split Ducting titik Err:508 Err:508 %
SUB TOTAL TATA UDARA LT 3 Err:508

C PEKERJAAN AIR BERSIH


1 Roof tank
Type
Kapasitas : 10 M3 set Err:508 Err:508 %
Type : FRP
2 Floating Valve Ø 1" bh Err:508 Err:508 %
3 Gate Valve, Ø 2" bh Err:508 Err:508 %
4 Pipa PPR, Ø 2" m Err:508 Err:508 %
5 WLC (Water Level Control) bh Err:508 0.00 %
6 Tansfer pump set Err:508 Err:508 %
Type : Vertikal multi stage
Kapasitas : 450 lpm total Head 40 mtr
Daya : 5,5 KW
Panel kontrol star-stop
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
7 Booster pump pakage set Err:508 Err:508 %
Type : Vertikal multi stage
Kapasitas : 450 lpm total Head 20 mtr
Daya : 2,2 KW
Panel kontrol star-stop
SUB TOTAL AIR BERSIH PEKERJAAN UTAMA Err:508
Pekerjaan Instalasi Air Bersih Lantai 1
- Pipa PPR, Ø 1" m Err:508 Err:508 %
- Pipa PPR, Ø 3/4" m Err:508 Err:508 %
- Pipa PPR, Ø 1/2 " m Err:508 Err:508 %
- Gate Valve, Ø 1" bh Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 1 Err:508
Pekerjaan Instalasi Air Bersih Lantai 2
- Pipa PPR, Ø 1,5" m Err:508 Err:508 %
- Pipa PPR, Ø 1" m Err:508 Err:508 %
- Pipa PPR, Ø 3/4" m Err:508 Err:508 %
- Pipa PPR, Ø 1/2 " m Err:508 Err:508 %
- Gate Valve, Ø 1,5" bh Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 2 Err:508
Pekerjaan Instalasi Air Bersih Lantai 3
- Pipa PPR, Ø 1,5" m Err:508 Err:508 %
Pipa PPR, Ø 1" m Err:508 Err:508 %
Pipa PPR, Ø 3/4" m Err:508 Err:508 %
Pipa PPR, Ø 1/2 " m Err:508 Err:508 %
Gate Valve, Ø 1,5" bh Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT 3 Err:508
Pekerjaan Instalasi Air Bersih Lantai Atap
- Pipa PPR, Ø 2" m Err:508 Err:508 %
SUB TOTAL AIR BERSIH LT ATAP Err:508
Pekerjaan Instalasi pipa Riser
- Pipa PPR, Ø 2" m Err:508 Err:508 %
SUB TOTAL AIR BERSIH RISER Err:508

D PEKERJAAN AIR KOTOR


Peralatan Utama
Pekerjaan Instalasi Air Kotor Lantai 1
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL AIR KOTOR LT.1 Err:508
Pekerjaan Instalasi Air Kotor Lantai 2
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL KOTOR LT.2 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
Pekerjaan Instalasi Air Kotor Lantai 3
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL KOTOR LT.3 Err:508
Pekerjaan Instalasi pipa Riser
Pipa PVC Class AW
- dia. 150 mm m Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
Pipa PVC Class D
- dia. 50 mm m' Err:508 Err:508 %
SUB TOTAL AIR KOTOR RISER Err:508

E PEKERJAAN AIR BEKAS


Pekerjaan Instalasi Air Bekas Lantai Basement
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 150 mm m Err:508 Err:508 %
- dia. 100 mm m' Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.1 Err:508
Pekerjaan Instalasi Air Bekas Lantai 1
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.1 Err:508
Pekerjaan Instalasi Air Bekas Lantai 2
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.2 Err:508
Pekerjaan Instalasi Air Bekas Lantai 3
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 100 mm m' Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
- dia. 50 mm m' Err:508 Err:508 %
- Floor Clean Out dia. 3" bh Err:508 Err:508 %
SUB TOTAL AIR BEKAS LT.3 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
Pekerjaan Instalasi Air Hujan lt.Atap
INSTALASI DAN ACCESORIES
Pipa PVC Class AW
- dia. 150 mm m Err:508 Err:508 %
- dia. 100 mm m' Err:508 Err:508 %
- Roof Drain dia. 4" bh Err:508 Err:508 %
SUB TOTAL AIR HUJAN LT. ATAP Err:508
Pekerjaan Instalasi pipa Riser
Pipa PVC Class AW
- dia. 150 mm m Err:508 Err:508 %
- dia. 80 mm m' Err:508 Err:508 %
SUB TOTAL INSTALASI PIPA RISER Err:508

F PEKERJAAN TATA SUARA


MAIN UNIT
1 Remote Paging Microphone 1 RM-200M bh Err:508 Err:508 %
2 CD/MMC/USB player with FM Tunner Z-CD2011R bh Err:508 Err:508 %
3 Emergency Message Panel Z-FV200EV-AS bh Err:508 Err:508 %
4 Digital Matrix Mixer w/ Equalizer Program M-9000M2. set Err:508 Err:508 %
5 Speaker Selector 10 ch bh Err:508 Err:508 %
6 Power Amplifier 480W Z-FV248PA-AS bh Err:508 Err:508 %
7 Cabinet Rack with Acc. RACK 23. set Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508
LANTAI 1
1 Terminal box (TBS) set Err:508 Err:508 %
2 Horn speaker 30 W ZH-615SM bh Err:508 Err:508 %
3 Ceiling Speaker 6 Watt ZS-648R bh Err:508 Err:508 %
4 volume control bh Err:508 Err:508 %
5 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
6 Kabel Feeder dari Juction Panel ke ;
- TBS BS, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
SUB TOTAL LANTAI 1 Err:508
LANTAI 2
1 Terminal box (TBS) set Err:508 Err:508 %
2 Ceiling Speaker 6 Watt ZS-648R bh Err:508 Err:508 %
3 volume control bh Err:508 Err:508 %
4 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
5 Kabel Feeder dari Juction Panel ke ;
- TBS BS, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508
LANTAI 3
1 Terminal box sound (TBS) set Err:508 Err:508 %
2 Ceiling Speaker 6 Watt type LHM0606/10 bh Err:508 Err:508 %
3 volume control bh Err:508 Err:508 %
4 Instalasi ttk ceiling speaker, NYMHy 3 x 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
5 Kabel Feeder dari Juction Panel ke ;
- TBS 1, NYMHy 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
SUB TOTAL LANTAI 2 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

G PEKERJAAN CCTV
MAIN UNIT
1 Network Video Recorder type DRN-5532-400N00 unit Err:508 Err:508 %
2 TV / Monitor 32 Inc unit Err:508 Err:508 %
3 PoE Gigabyte 24 Port unit Err:508 Err:508 %
4 Equitment Rack 12 U Indorack IR8012G unit Err:508 Err:508 %
SUB TOTAL MAIN UNIT Err:508
LANTAI 1
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 1 Err:508
LANTAI 2
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 2 Err:508
LANTAI 3
1 IP Dome Camera type NUC-51022-F2 unit Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
SUB TOTAL CCTV LT 3 Err:508

H PEKERJAAN TELEPHONE
MAIN UNIT
1 Pabx Panasonic NS 300 6 Line 80 Extension Analog set Err:508 Err:508 %
2 MDF + Surge Arester set Err:508 Err:508 %
3 Batery Back Up 2200 VA set Err:508 Err:508 %
Kabel Fider
4 - Dari TB Lt 1 ke TB Lt 2 kabel ITC 10 pair include pipa conduit m' Err:508 Err:508 %
5 - Dari TB Lt 2 ke TB Lt 3 kabel ITC 20 pair include pipa conduit m' Err:508 Err:508 %
6 - Dari TB Lt 3 ke TB Lt 4 kabel ITC 30 pair include pipa conduit m' Err:508 Err:508 %
7 - Dari TB Lt 4 ke TB Lt 5 kabel ITC 30 pair include pipa conduit m' Err:508 Err:508 %
8 - Dari TB Lt 5 ke TB Lt 6 kabel ITC 20 pair include pipa conduit m' Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508
LANTAI 1
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 1 Err:508
LANTAI 2
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 2 Err:508
LANTAI 3
1 Terminal Box set Err:508 Err:508 %
1 Telephone Panasonic KX-TS 505 unit Err:508 Err:508 %
2 Outlet Telepon RJ 11 set Err:508 Err:508 %
3 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
4 Kabel Tray 200x50 m' Err:508 Err:508 %
SUB TOTAL TELEPHONE LANTAI 3 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

I PEKERJAAN FIRE ALARM


PERALATAN UTAMA
1 Fire panel w ith Module & Remote Service FPA-1200-C-APR unit Err:508 Err:508 %
2 Remote Keypad FMR-5000-C-13 bh Err:508 Err:508 %
3 MDF + Surge Arester set Err:508 Err:508 %
4 Batery Back Up set Err:508 Err:508 %
5 Grounding 0.1 Ohm lot Err:508 Err:508 %
SUB TOTAL MAIN UNIT TELEPHONE Err:508
LANTAI 1
1 Terminal Box Fire Alarm (TBFA) bh Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh Err:508 Err:508 %
3 Smoke detector optical FCP-O320 bh Err:508 Err:508 %
4 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh Err:508 Err:508 %
5 Motor bell, 6" 24V, red MB-G6-24-R bh Err:508 Err:508 %
6 Beacon, surface-mount, red FNS-320-SRD bh Err:508 Err:508 %
7 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik Err:508 Err:508 %
8 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
9 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
10 FE (APAR) Type CO2 kapasitas 5 Kg unit Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 1 Err:508
LANTAI 2
1 Terminal Box Fire Alarm (TBFA) bh Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh Err:508 Err:508 %
3 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh Err:508 Err:508 %
4 Motor bell, 6" 24V, red MB-G6-24-R bh Err:508 Err:508 %
5 Beacon, surface-mount, red FNS-320-SRD bh Err:508 Err:508 %
6 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik Err:508 Err:508 %
7 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
8 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
9 FE (APAR) Type CO2 kapasitas 5 Kg unit Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 2 Err:508
LANTAI 3
1 Terminal Box Fire Alarm (TBFA) bh Err:508 Err:508 %
2 Rate Of Rise Heat Detector With Base FAH-425-T-RFAH-425-T-R bh Err:508 Err:508 %
3 Manual call point reset surface-mnt, glass FMC-300RW-GSGRD bh Err:508 Err:508 %
4 Motor bell, 6" 24V, red MB-G6-24-R bh Err:508 Err:508 %
5 Beacon, surface-mount, red FNS-320-SRD bh Err:508 Err:508 %
6 Instalasi titik detector, 2 x NYA 1,5 mm2, termasuk PVC Konduit dia. 20 mm titik Err:508 Err:508 %
7 Instalasi ttk indicator, Bell, Manual, 2xNYA 1,5 mm2, termasuk PVC Konduit Ø 20mm titik Err:508 Err:508 %
8 Kabel Feeder dari TBFA ke ;
- MCFA, Twisted Shilded 2 x 1 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508
- MCFA, Power NYM 3 x 2,5 mm2, termasuk PVC Konduit dia. 20 mm mtr Err:508 Err:508 %
9 FE (APAR) Type CO2 kapasitas 5 Kg unit Err:508 Err:508 %
SUB TOTAL FIRE ALARM LT 3 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

J PEKERJAAN PENANGKAL PETIR


Pengadaan dan pemasangan penangkal petir elektro statis termasuk perijinan instansi terkait
- Penangkal petir elektro statis radius 120 Mtr lot Err:508 Err:508 %
- OBS ligthing
- Tiang single pole tinggi +- 15 meter
- NYY 70 mm
- Counter struk
- Grounding 1 ohm
- Bak kontrol (40x40) dengan penutup plat besi
SUB TOTAL PENENGKAL PETIR Err:508

K PEKERJAAN CABLE TV
LANTAI 1
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 1 Err:508
LANTAI 2
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 2 Err:508
LANTAI 3
- Outlet TV bh Err:508 Err:508 %
- Splitter bh Err:508 Err:508 %
- Tap Off bh Err:508 Err:508 %
- Stop Kontak ex.scheneider CABLE TV bh Err:508 Err:508 %
- Instalasi Power CABLE TV titik Err:508 Err:508 %
- Instalasi CABLE TV dengan Kabel Coaxial RG 6 titik Err:508 Err:508 %
- Kabel Feeder dari Head End ke Tap Off Coaxial RG 6 m' Err:508 Err:508 %
SUB TOTAL CABLE TV LT 3 Err:508

L PEKERJAAN LAN
LANTAI 1
1 Outlet LAN RJ 45 bh Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
3 Switch HUB 6 port bh Err:508 Err:508 %
SUB TOTAL LAN LT 1 Err:508
LANTAI 2
1 Outlet LAN RJ 45 bh Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
3 Switch HUB 24 port bh Err:508 Err:508 %
SUB TOTAL LAN LT 2 Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
LANTAI 3
1 Outlet LAN RJ 45 bh Err:508 Err:508 %
2 Instalasi camera, cat 6 dalam Pipa Conduit 20mm ttk Err:508 Err:508 %
3 Switch HUB 24 port bh Err:508 Err:508 %
SUB TOTAL LAN LT 3 Err:508

M PEKERJAAN SISTEM ELEVATOR.


2 Peralatan Utama & Penunjang.
Unit Lift Passanger (Pasien) unit Err:508 Err:508 %
Kapasitas : 15 Orang ( 1.200 kg )
Kecepatan : 105 m/menit
Pelayanan : Lt. 1 s/d LT.3
Termasuk Automatic Rescue Device (ARD) untuk lift passanger.
SUB TOTAL PEKERJAAN ELEVATOR Err:508

N PEKERJAAN HYDRANT & SPLINKLER


Pengadaan , pemasangan dan pengujian peralatan pompa-pompa
lengkap terpasang sesuai dengan spesifikasi tehnis dan gambar rencana.
Termasuk perijinan dari instansi terkait
a PERALATAN UTAMA
1 Pompa Diesel Fire Pump (DFP) - (NFPA - 20 Non Listed). unit Err:508 Err:508 %
Model : 100-80 FSJ, couple whit Iveco Engine.
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Engine : Clarke engine power 99BHP@2900 rpm.
Type Engine : N45 MNA F40.
- Base Plate Coupling & Guard.
Control Panel For Diesel Engine Driven Pump-NFPA20 Non Listed.
Complete with :
- Suction & Discharge gauge
- Batteries
- Steel baseplate
- Flexible Coupling
- Steel Coupling Guard
- Industral Silenser
- Fuel tank

2 Pompa Elektrik Fire Pump - nfpa 20 Non Listed unit Err:508 Err:508 %
Model : 100-80 fscj
Kapasitas : 500 GPM
Head : 90 - 100 m.
Type : Horizontal and Suction Pump.
Complete with :
- Electric Motor ( fatory choice ), 75 kW / 3 x 380 V / 50 Hz / 3 P 2.900 rpm.
- Panel controller Y Delta open transition, NFPA- 20 Non Listed.
- Base Plate coupling and guard.

3 Pompa Jockey Pump ( JFP ) unit Err:508 Err:508 %


Model : CRS-20, Groudpos Pump.
Kapasitas : 75 GPM
Head : 100 m.
Type : Vertical Multi Stage.
Power : 7,5 kW/380V/50Hz/3ph/2900 rpm.
Accessories : Suction & Discharge gauge.
Jockey Pump controller NFPA-20 Non Listed
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

Pengadaan , pemasangan dan pengujian peralatan accessories dan


katu-katup lengkap terpasang sesuai dengan spesifikasi tehnis dan
gambar rencana.
4 Pipa Instalasi
- Pipa Header dia 200 mm bh Err:508 Err:508 %
- Pipa dia 100 mm m' Err:508 Err:508 %
- Pipa dia 65 mm m' Err:508 Err:508 %
5 Non Return Valve
- dia 80 mm bh Err:508 Err:508 %
- dia 50 mm bh Err:508 Err:508 %
6 Gate Valve
- Gate Valve dia 100 mm bh Err:508 Err:508 %
- Gate Valve dia 80 mm bh Err:508 Err:508 %
- Gate Valve dia 65 mm bh Err:508 Err:508 %
- Gate Valve dia 50 mm bh Err:508 Err:508 %
7 Strainer
- Strainer dia 100 mm bh Err:508 Err:508 %
- Strainer dia 80 mm bh Err:508 Err:508 %

8 Flexible Joint
- Flexible Joint dia 50 mm bh Err:508 Err:508 %
- Flexible Joint dia 65 mm bh Err:508 Err:508 %
- Flexible Joint dia 80 mm bh Err:508 Err:508 %
- Flexible Joint dia 100 mm bh Err:508 Err:508 %

9 Butterfly Valve
- Batterflay Valve dia 100 mm bh Err:508 Err:508 %
- Batterflay Valve dia 80 mm bh Err:508 Err:508 %
- Batterflay Valve dia 65 mm bh Err:508 Err:508 %

10 Floater valve I/D pilot control dia 65 mm bh Err:508 Err:508 %


- Gate Valve dia 80 mm bh Err:508 Err:508 %
- Gate Valve dia 15 mm bh Err:508 Err:508 %
11 Pressure Reducing Valve (PRV) bh Err:508 Err:508 %
12 Premming Tank 250 ltr bh Err:508 Err:508 %
13 Sefety Valve dia.100 mm bh Err:508 Err:508 %
14 Safety valve dia.20 mm bh Err:508 Err:508 %
15 Alarm Gong bh Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA Err:508
b PEKERJAAN INSTALASI FIRE HYDRANT
1 SITE PLAN
Pemipaan
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 150 mm (sprinkler dari ruang pompa ke gedung m' Err:508 Err:508 %
- Pipa dia : 100 mm (sprinkler dari ruang pompa ke gedung m' Err:508 Err:508 %
- Pipa dia : 100 mm hydrant kawasan m' Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot Err:508 Err:508 %
- Hydrant Pilar (HP) bh Err:508 Err:508 %
- Outdoor Hydrant Box Unit bh Err:508 Err:508 %
- Hose Reel Cabinet (HRC) bh Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
- Siamese Conection (SC) bh Err:508 Err:508 %
- Check Valve : 100 mm bh Err:508 Err:508 %
- Gate Valve dia 100 mm bh Err:508 Err:508 %
- Galian Pipa + Timbunan kembali dengan kedalaman 60 cm. m' Err:508 Err:508 %
SUB TOTAL HYDRANT SITE PLAN Err:508
2 LANTAI 1
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 100 mm m' Err:508 Err:508 %
- Pipa dia : 80 mm m' Err:508 Err:508 %
- Pipa dia : 65 mm m' Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot Err:508 Err:508 %
- Indoor Hydrant Box Unit bh Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh Err:508 Err:508 %
- Gate Valve : 65 mm bh Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh Err:508 Err:508 %
SUB TOTAL HYDRANT LT.1 Err:508
3 LANTAI - 2
a Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' Err:508 Err:508 %
- Pipa dia : 65 mm M' Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot Err:508 Err:508 %
- Indoor Hydrant Box Unit bh Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh Err:508 Err:508 %
- Gate Valve : 65 mm bh Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh Err:508 Err:508 %
SUB TOTAL HYDRANT LT.2 Err:508
4 LANTAI - 3
Pekerjaan Insatalasi Hydrant termasuk support dan materian bantu
Bahan Pipa : BSP, Schedule - 40 (ASTM A-120)
- Pipa dia : 80 mm M' Err:508 Err:508 %
- Pipa dia : 65 mm M' Err:508 Err:508 %
- Jointing, Elbow, Support, Hanger, etc. lot Err:508 Err:508 %
- Indoor Hydrant Box Unit bh Err:508 Err:508 %
Valve - Valve
- Gate Valve : 80 mm bh Err:508 Err:508 %
- Gate Valve : 65 mm bh Err:508 Err:508 %
- Fire Extunguisher C02 Kap. 5 Kg bh Err:508 Err:508 %
- Sprinkeler Pendant K 5,6 bh Err:508 Err:508 %
SUB TOTAL HYDRANT LT.3 Err:508
O PEKERJAAN GAS MEDIS
PERALATAN UTAMA GAS MEDIS
1 Sentral Oksigen Kapasitas 2x10 set Err:508 Err:508 %
Type : Automatic
terdiri dari :
- Full digital automatic change over device
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

2 Sentral N20 Kapasitas 2x2 set Err:508 Err:508 %


Type : Manual
terdiri dari :
- Regulator
- Header Manifold
- Chilinder Lead
- Support and Rak Silinder

3 Sentral Compress Air set Err:508 Err:508 %


Type : Duplex System
terdiri dari :
- Compressor kapasitas 405 l/m; 3 ph Hitachi, OILESS Copressor
- Compressor Tank (vol.50 ltr) - lokal
- Air Dryer
- Pre Filter
- After Filter
- Control Panel-Panel
- Instalasi Pipa sentral Compressor Air
- Regulator Compressore Air- Low Pressure, single Stage SMC
- Compressore switch

4 Sentral Vacuum set Err:508 Err:508 %


- Vacuum Pump kapasitas 165 M3/H; 2,2 KW
- Vacuum Tank (volume 500 liter) Lokal
- Bacterial Filter
- Control Panel Lokal
- Support & Consumeble material
- Vacuum Switch

5 Arlarm type IV gas bh Err:508 Err:508 %

INSTALASI GAS MEDIS

MAIN LINE DARI SENTRAL & SHAFT (Sentral 4 Gas)


6 Pemipaan gas Oksigen
- Pipa tembaga Medis ASTM B819 type L, INIPRO Ø 1 3/8" m' Err:508 Err:508 %
- Pipa tembaga Medis ASTM B819 type L, INIPRO Ø 3/4" m' Err:508 Err:508 %

7 Pemipaan Gas N2O


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %

8 Pemipaan Compress Air


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %

9 Pemipaan Vacuum
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' Err:508 Err:508 %

10 Ball Valve 3/4" bh Err:508 Err:508 %


11 Ball Valve 1 1/4" bh Err:508 Err:508 %
12 Ball Valve 1 1/2" bh Err:508 Err:508 %
SUB TOTAL PERALATAN UTAMA GAS MEDIS Err:508
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
LANTAI 2
Pekerjaan Insatalasi Gas medis pipa tembaga medis ASTM B-819 termasuk support dan materian bantu
1 Pemipaan gas Oksigen
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

2 Pemipaan gas N2O


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

3 Pemipaan gas Air


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

4 Pemipaan gas Vacuum


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

5 Pemipaan gas AGSS/WAGD


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Wall Outlet O2, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %
- Wall Outlet N2O, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %
- Wall Outlet Commpress Air, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %
- Wall Outlet Vacuum, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %
- Wall Outlet AGSS/WAGD, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %

6 Zone Valve dan Alarm


- Box Valve type IV gas (ONAV) bh Err:508 Err:508 %
- Alarm type IV gas (ONAV) bh Err:508 Err:508 %
- Box Valve type III gas (ONAV) bh Err:508 Err:508 %
- Alarm type III gas (ONAV) bh Err:508 Err:508 %
- Ceilling Gas 4 Gas set Err:508 Err:508 %
- Ball Valve 1/2" bh Err:508 Err:508 %
SUB TOTAL GAS MEDIS LT.2 Err:508
3 Lantai 3
Pekerjaan Insatalasi Gas medis pipa tembaga medis ASTM B-819 termasuk support dan materian bantu
1 Pemipaan gas Oksigen
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/4" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1/2" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

2 Pemipaan gas Vacuum


- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 1 1/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/4" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 5/8" m' Err:508 Err:508 %
- Pipa tembaga medis ASTM B-819 Type, UNIPRO Ø 3/8" m' Err:508 Err:508 %

- Wall Outlet O2, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %


- Wall Outlet Vacuum, OHMEDA Satandart, TRITECH bh Err:508 Err:508 %
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)

3 Zone Valve dan Alarm


- Box Valve type II gas (ONAV) bh Err:508 Err:508 %
- Alarm type II gas (ONAV) bh Err:508 Err:508 %

- Bedhead bh Err:508 Err:508 %


- Ball Valve 3/4" bh Err:508 Err:508 %
SUB TOTAL GAS MEDIS LT.3 Err:508

P PEKERJAAN NURSE CALL AIPHONE


PENGADAAN DAN PEMASANGAN PERALATAN DAN INSTALASI NURSE CALL
Lantai 1 :
1 Master Station, 20-call NIM-20B.E. bh Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh Err:508 Err:508 %
3 Corridor light NIR-4.E. bh Err:508 Err:508 %
4 Call reset button NIR-2.E bh Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %

Lantai 2 :
1 Master Station, 20-call NIM-20B.E. bh Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh Err:508 Err:508 %
3 Corridor light NIR-4.E. bh Err:508 Err:508 %
4 Call reset button NIR-2.E bh Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %

Lantai 3 :
1 Master Station, 20-call NIM-20B.E. bh Err:508 Err:508 %
2 Ceiling Speaker NI-LB.E bh Err:508 Err:508 %
3 Corridor light NIR-4.E. bh Err:508 Err:508 %
4 Call reset button NIR-2.E bh Err:508 Err:508 %
5 Bathroom call button with pull cord NIR-7HW.E bh Err:508 Err:508 %
6 Wall jack with mic. & Bed side Call Switch NIR-MB.E. bh Err:508 Err:508 %
7 Instalasi outlet telepon, ITC 4 x 1x 0,6 mm2, termasuk PVC Konduit dia. 20 mm ttk Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508

Q PEKERJAAN INSTALASI PENGOLAHAN LIMBAH (IPAL)

a Pengadaan Pompa termasuk Aksesories, Valve, Bronze and Support Bracket


Aksesories perpipaan, Ball Valve PVC, Cek Valve kuningan, Foot Valve, Strainer
( menyesuaikan ukuran In/Out Pompa) Suport dari UNP menyesuaikan lapangan,
Instalasi pemipaan PVC class AW
1 Pengadaan Transfer Pump Influent unit Err:508 Err:508 %
Type : Submersible
Kapasitas : 1,45 m3/jam
Head : 10 m
Max Solid Size : 45 mm
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
2 Pengadaan Transfer Pump Effluent unit Err:508 Err:508 %
Type : Submersible
Kapasitas : 1,45 m3/jam
Head : 10 m
Max Solid Size : 45 mm
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

3 Pengadaan RAS Pump unit Err:508 Err:508 %


Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,75 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

4 Pengadaan Mixing Pump unit Err:508 Err:508 %


Type : Centrifugal Selft Priming
Kapasitas : 2,1 m3/jam
Head : 15 m
Power EM : 1,5 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel
Asssesoris : Injektor

5 Pengadaan Filter Pump unit Err:508 Err:508 %


Type : Centrifugal Selft Priming
Kapasitas : 2.1 m3/jam
Head : 10 m
Power EM : 0,37 Kw 380 Volt
Shaft Seal : Gland Packing
Material : casing cast Iron
Impeller : Bronze
Shaft : Stainless Steel

b Pekerjaan Tanki Equalisasi unit Err:508 Err:508 %


1 Pengadaan Corse Buble Diffuser
Diameter : 4 "
Material : ABS
Conection : 3/4 "
Ukuran Bubble : lebih besar dari 4mm

2 Pengadaan Pressured Air Piping Installasi ls Err:508 Err:508 %


Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa PVC 3/4" yang masuk ke air
- Gate valve 3/4"
- Panjang pipa dan jumlah aksesoris menyesuaikan kebutuhan di lapangan
REALISASI MINGGU INI BOBOT

NO URAIAN PEKERJAAN SAT BOBOT PEKERJAAN


VOLUME
(%) TERLAKSANA (%)
c Pekerjaan Kolam Aerasi
1 Pengadaan Blower unit Err:508 Err:508 %
Type : Root Rotary Blower
Negara Asal : Ex. Taiwan
Kapasitas Udara : 2,9 m³/menit/unit
Maximum Presure : 4.000 mm Aq
Outlet Blower : 2,5 "
Power EM : 3,7 KW, 380 Volt 50 Hz

2 Pengadaan Fine Buble Difuser bh Err:508 Err:508 %


Diameter : 25 cm
Kapasitas Udara : 6 - 8 m³/jam/unit
Oksigen Transfer : 20 - 40 %
Diameter Bubble : 1-3 mm
Conection : 3/4 "
Material : Frame ABS
Membrant : EPDM
Check Valve : EPDM

3 Pengadaan Pressured Air Piping Installasi ls Err:508 Err:508 %


Bahan :
- Pipa Sch 20 diameter 4" untuk Main Distribusi
- Pipa Sch 20 diameter 4" untuk cabang - cabang
- Pipa Sch 20 diameter 6 " untuk Header
- Tee, elbow menggunakan SGP, Gate valve, fleksible join
- Pipa Stainless Steell SUS 304 Sch 10dia. 2 " dan PVC yang masuk ke air

4 Chlorinasi sistem unit Err:508 Err:508 %

d Pekerjaan Pengadaan Electrical IPAL


1 Wiring Kabel ls Err:508 Err:508 %
- Ukuran Kabel disesuaikan dengan power motor
- Merk Kabel Supreme, jembo, kabelmetal atau setara
- panjang kabel menyesuaikan di lapangan

2 Panel Control unit Err:508 Err:508 %

e Pekerjaan Sipil , Fabrikasi dan Perpipaan


1 Pekerjaan Sipil STP pondasi ( Tanki STP ) dan Roofing unit Err:508 Err:508 %
2 Tanki Grease Trapp Volume 2 M3 Material FRP unit Err:508 Err:508 %
3 Tanki Equalisasi Volume 6 M3 Material FRP unit Err:508 Err:508 %
4 Tanki Anoxid Volume 6 M3 Material FRP unit Err:508 Err:508 %
5 Tanki Aerasi Volume 30 M3 Material FRP unit Err:508 Err:508 %
6 Tanki Sedimentasi Volume 7,85 M3 Material FRP unit Err:508 Err:508 %
7 Tanki Pump pitch Volume 1 M3 Material FRP unit Err:508 Err:508 %
8 Tanki Clear Water Volume 2 M3 Material FRP unit Err:508 Err:508 %
9 Sand Filter Cap. 1,45 M3/H, Material FRP, Dia 400 mm x 1200mm (H) unit Err:508 Err:508 %
10 Carbon Filter Cap. 1,45 M3/H, Material FRP, Dia 400 mm x 1200mm (H) unit Err:508 Err:508 %
SUB TOTAL NURSE CALL AIPHONE Err:508

TOTAL Err:508
REKAPITULASI
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011

NO. URAIAN PEKERJAAN JUMLAH BIAYA (Rp.)

A PEKERJAAN PERSIAPAN 76,456,199.00

B PEKERJAAN TANAH 100,483,727.60

C PEKERJAAN STRUKTUR 1,291,640,023.09

I JUMLAH BIAYA 1,468,579,949.69


II PPN 10% x ( I ) 146,857,994.97
III TOTAL TERMASUK PPN 1,615,437,944.65
IV PEMBULATAN 1,615,430,000.00

TERBILANG : Satu Milyar Enam Ratus Lima Belas Juta Empat Ratus Tiga Puluh Ribu Rupiah

Samarinda, Februari 2012


Dibuat Oleh,
CV. HANDTER JAYA

ACHMAD BARKATI
Direktur
RENCANA ANGGARAN BIAYA ( RAB )

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011

HARGA SATUAN
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.)
(Rp.)

A PEKERJAAN PERSIAPAN
1 Pagar Proyek m' 129.82 279,950.00 36,343,109.00
2 Barak kerja Ls 1.00 15,000,000.00 15,000,000.00
3 Pengukuran dan Pemasangan Bouwplank m' 120.10 50,900.00 6,113,090.00
4 Bongkar Bangunan Existing termasuk pembersihan Ls 1.00 12,500,000.00 12,500,000.00
5 Mobilisasi dan Demobilisasi Ls 1.00 6,500,000.00 6,500,000.00
0 0.00
Subtotal A 76,456,199.00
0 0.00
B PEKERJAAN TANAH 0.00
1 Galian Tanah Pile cap & Sloof m3 131.87 28,000.00 3,692,360.00
2 Urugan Pasir Bawah Pile cap dan Sloof m3 9.47 145,000.00 1,372,570.00
3 Urugan Pasir Bawah Lantai m3 57.85 145,000.00 8,387,670.00
4 Lantai Kerja bawah Pile Cap dan Sloof m2 94.58 97,980.00 9,266,948.40
5 Lantai Kerja bawah Lantai m2 578.46 97,980.00 56,677,510.80
6 Urugan Tanah Kembali m3 97.55 13,420.00 1,309,121.00
7 Urugan Tanah Peninggian Lantai m3 289.23 68,380.00 19,777,547.40

Subtotal B 100,483,727.60
0.00
C PEKERJAAN STRUKTUR 0.00
1 Pekerjaan Tiang Pancang
a. Pengadaan Tiang Pancang 25x25 cm L=24 M m' 2,856.00 200,000.00 571,200,000.00
b. Pemancangan Tiang Pancang 25x25 cm L=24M m' 2,856.00 38,500.00 109,956,000.00
c. Sambungan Tiang Pancang 25x25 cm titik 336.00 35,000.00 11,760,000.00
d. Potong Tiang Pancang 25x25 cm titik 112.00 55,000.00 6,160,000.00
e. PDA Test titik 4.00 10,000,000.00 40,000,000.00
2 Pekerjaan Pondasi 0.00
a. Pile cap P1 0.00
(1). Besi U-40 kg 1,457.50 14,985.50 21,841,366.25
(2). Bekisting m2 35.88 121,390.00 4,355,473.20
(3). Beton ready mix K-250 m3 5.83 1,559,500.00 9,091,885.00
b. Pile cap P2 0.00
(1). Besi U-40 kg 1,345.00 14,985.50 20,155,497.50
(2). Bekisting m2 25.95 121,390.00 3,150,070.50
(3). Beton ready mix K-250 m3 5.38 1,559,500.00 8,390,110.00
c. Pile cap P3 0.00
(1). Besi U-40 kg 1,332.50 14,985.50 19,968,178.75
(2). Bekisting m2 35.52 121,390.00 4,311,772.80
(3). Beton ready mix K-250 m3 5.33 1,559,500.00 8,312,135.00
d. Pile cap P4 0.00
(1). Besi U-40 kg 2,380.00 14,985.50 35,665,490.00
(2). Bekisting m2 35.88 121,390.00 4,355,473.20
(3). Beton ready mix K-250 m3 9.52 1,559,500.00 14,846,440.00
e. Sloof S1-15/30 0.00
(1). Besi U-40 kg 3,286.48 14,985.50 49,249,593.99
(2). Besi U-24 kg 609.04 14,460.50 8,807,022.34
(3). Bekisting m2 200.64 130,640.00 26,211,609.60
(4). Beton ready mix K-250 m3 15.05 1,559,500.00 23,467,356.00
f. Sloof S2-25/40 0.00
(1). Besi U-40 kg 3,925.62 14,985.50 58,827,445.94
(2). Besi U-24 kg 932.49 14,460.50 13,484,339.32
(3). Bekisting m2 345.87 130,640.00 45,184,456.80
(4). Beton ready mix K-250 m3 32.94 1,559,500.00 51,369,930.00
HARGA SATUAN
NO. URAIAN PEKERJAAN SAT VOLUME JUMLAH HARGA (Rp.)
(Rp.)

3 Pekerjaan Struktur Atas 0.00


a. Kolom K1-30/50 0.00
(1). Besi U-40 kg 1,085.36 14,985.50 16,264,662.28
(2). Besi U-24 kg 262.24 14,460.50 3,792,121.52
(3). Bekisting m2 66.84 136,120.00 9,098,260.80
(4). Beton ready mix K-250 m3 6.27 1,559,500.00 9,778,065.00
b. Kolom K2-30/30 0.00
(1). Besi U-40 kg 1,120.51 14,985.50 16,791,402.61
(2). Besi U-24 kg 182.65 14,460.50 2,641,210.33
(3). Bekisting m2 78.81 136,120.00 10,727,617.20
(4). Beton ready mix K-250 m3 5.91 1,559,500.00 9,216,645.00
c. Kolom K3-20/40 0.00
(1). Besi U-40 kg 1,190.59 14,985.50 17,841,586.45
(2). Besi U-24 kg 202.19 14,460.50 2,923,768.50
(3). Bekisting m2 23.04 153,072.50 3,526,790.40
(4). Beton ready mix K-250 m3 1.54 1,290,000.00 1,986,600.00
d. Kolom K4-40/60 0.00
(1). Besi U-40 kg 787.48 14,985.50 11,800,781.54
(2). Besi U-24 kg 190.25 14,460.50 2,751,110.13
(3). Bekisting m2 10.14 153,072.50 1,552,155.15
(4). Beton ready mix K-250 m3 0.64 1,290,000.00 825,600.00

Subtotal C 1,291,640,023.09
ANALISA HARGA SATUAN
KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011

NO URAIAN SATUAN UPAH UNIT PRICE JUMLAH

A PEKERJAAN PERSIAPAN
1 Pagar Sementara dari Seng Gelombang Tinggi 2 M m'
1.2000 Lbr Seng Gelombang - 45,000.00 54,000.00
0.4500 Kg Meni Besi - 12,500.00 5,625.00
0.0600 Kg Paku Seng - 17,500.00 1,050.00
0.0090 M3 Koral Beton - 175,000.00 1,575.00
0.0500 zak Semen Portland 50 Kg - 75,000.00 3,750.00
0.0050 M3 Pasir Beton - 150,000.00 750.00
0.0720 M3 Kayu 5/7 - 2,200,000.00 158,400.00
1.0000 Btg Kayu Dolken dia. 8-10/400 cm - 11,000.00 11,000.00
0.4000 OH Pekerja Biasa 60,000.00 - 24,000.00
0.2000 OH Tukang Kayu 80,000.00 - 16,000.00
0.0200 OH Kepala Tukang 90,000.00 - 1,800.00
0.0200 OH Mandor 100,000.00 - 2,000.00
- - 279,950.00

2 Pengukuran dan Pemasangan Bouwplank m'


0.0120 M3 Kayu 5/7 - 1,850,000.00 22,200.00
0.0200 kg Paku 2"-5" - 17,500.00 350.00
0.0070 M3 Kayu Papan 3/20 - 1,850,000.00 12,950.00
0.1000 OH Pekerja Biasa 60,000.00 - 6,000.00
0.1000 OH Tukang Kayu 80,000.00 - 8,000.00
0.0100 OH Kepala Tukang 90,000.00 - 900.00
0.0050 OH Mandor 100,000.00 - 500.00
- - 50,900.00

B PEKERJAAN TANAH
1 Galian Tanah Biasa sedalam 1 M m3
0.4000 OH Pekerja Biasa 60,000.00 - 24,000.00
0.0400 OH Mandor 100,000.00 - 4,000.00
- - 28,000.00

2 Urugan Kembali m3
0.1920 OH Pekerja Biasa 60,000.00 - 11,520.00
0.0190 OH Mandor 100,000.00 - 1,900.00
- - 13,420.00

3 Urugan Tanah Pilihan m3


1.2000 m3 Tanah pilihan 45,800.00 54,960.00
0.1920 OH Pekerja Biasa 60,000.00 - 11,520.00
0.0190 OH Mandor 100,000.00 - 1,900.00
- - 68,380.00

4 Urugan Pasir m3
1.2000 M3 Pasir Urug (Mahakam) - 105,000.00 126,000.00
0.3000 OH Pekerja Biasa 60,000.00 - 18,000.00
0.0100 OH Mandor 100,000.00 - 1,000.00
- - 145,000.00

C PEKERJAAN PONDASI
1 Pasangan Pondasi Batu Gunung Camp. 1 : 4 M3
1.1000 M3 Batu Belah 15/20 cm - - 175,000.00 192,500.00
3.2600 zak Semen @ 50 Kg - - 75,000.00 244,500.00
0.5200 M3 Pasir Pasang (Tenggarong) - - 110,000.00 57,200.00
1.5000 OH Pekerja Biasa - 60,000.00 - 90,000.00
0.6000 OH Tukang Batu - 80,000.00 - 48,000.00
0.0600 OH Kepala Tukang - 90,000.00 - 5,400.00
0.0750 OH Mandor - 100,000.00 - 7,500.00
- - 645,100.00
2 Membuat Beton Tumbuk Camp. 1 Pc : 3 Ps : 5 Kr M3
0.8700 M3 Koral Beton - - 175,000.00 152,250.00
4.3600 zak Semen Portland 50 Kg - - 75,000.00 327,000.00
0.5200 M3 Pasir Beton - - 150,000.00 78,000.00
1.6500 OH Pekerja Biasa - 60,000.00 - 99,000.00
0.2500 OH Tukang Batu - 80,000.00 - 20,000.00
0.0250 OH Kepala Tukang - 90,000.00 - 2,250.00
0.0800 OH Mandor - 100,000.00 - 8,000.00
- - 686,500.00
NO URAIAN SATUAN UPAH UNIT PRICE JUMLAH

3 Lantai kerja Beton Tumbuk Camp. 1Pc:3Ps:5Kr Tbl 5cm m2


0.0440 M3 Koral Beton - 175,000.00 7,700.00
0.2000 zak Semen Portland 50 Kg - 75,000.00 15,000.00
0.0260 M3 Pasir Beton - 150,000.00 3,900.00
1.1500 OH Pekerja Biasa 60,000.00 - 69,000.00
0.0200 OH Tukang Batu 80,000.00 - 1,600.00
0.0020 OH Kepala Tukang 90,000.00 - 180.00
0.0060 OH Mandor 100,000.00 - 600.00
- - 97,980.00

4 Pembesian dengan Besi Polos Kg


1.0500 Kg Besi beton polos - 12,500.00 13,125.00
0.0150 Kg Kawat Beton - 17,500.00 262.50
0.0070 OH Pekerja Biasa 60,000.00 420.00
0.0070 OH Tukang Besi 80,000.00 560.00
0.0007 OH Kepala Tukang 90,000.00 63.00
0.0003 OH Mandor 100,000.00 30.00
- - 14,460.50

5 Pembesian dengan Besi Ulir Kg


1.0500 Kg Besi beton ulir - 13,000.00 13,650.00
0.0150 Kg Kawat Beton - 17,500.00 262.50
0.0070 OH Pekerja Biasa 60,000.00 420.00
0.0070 OH Tukang Besi 80,000.00 560.00
0.0007 OH Kepala Tukang 90,000.00 63.00
0.0003 OH Mandor 100,000.00 30.00
- - 14,985.50
6 Pasangan Bekisting untuk Pondasi m2
0.1000 Ltr Minyak Bekesting - 5,000.00 500.00
0.3000 Kg Paku - 17,500.00 5,250.00
0.0400 M3 Kayu Bekisting - 1,850,000.00 74,000.00
0.3000 OH Pekerja Biasa 60,000.00 - 18,000.00
0.2600 OH Tukang Kayu 80,000.00 - 20,800.00
0.0260 OH Kepala Tukang 90,000.00 - 2,340.00
0.0050 OH Mandor 100,000.00 - 500.00
1 x Pakai - - 121,390.00
7 Pasangan Bekisting untuk Sloof m2
0.1000 Ltr Minyak Bekesting - 5,000.00 500.00
0.3000 Kg Paku - 17,500.00 5,250.00
0.0450 M3 Kayu Bekisting - 1,850,000.00 83,250.00
0.3000 OH Pekerja Biasa 60,000.00 - 18,000.00
0.2600 OH Tukang Kayu 80,000.00 - 20,800.00
0.0260 OH Kepala Tukang 90,000.00 - 2,340.00
0.0050 OH Mandor 100,000.00 - 500.00
1 x Pakai - - 130,640.00
8 Pasangan Bekisting untuk Kolom m2
0.2000 Ltr Minyak Bekesting 5,000.00 1,000.00
0.4000 Kg Paku 17,500.00 7,000.00
2.0000 Btg Dolken Kayu Galam dia 8-10 / 4 m 11,000.00 22,000.00
0.0150 M3 Kayu Bekisting 1,850,000.00 27,750.00
0.0400 M3 Kayu Bekisting 1,850,000.00 74,000.00
0.3500 Lbr Plywood 9 mm 105,000.00 36,750.00
0.3000 OH Pekerja Biasa 60,000.00 18,000.00
0.3300 OH Tukang Kayu 80,000.00 26,400.00
0.0330 OH Kepala Tukang 90,000.00 2,970.00
0.0050 OH Mandor 100,000.00 500.00
1 x Pakai - - 216,370.00
Untuk 2x pakai, koefisien bahan tidak habis pakai x 0.5, sehingga :
0.2000 Ltr Minyak Bekesting 5,000.00 1,000.00
0.4000 Kg Paku 17,500.00 7,000.00
1.0000 Btg Dolken Kayu Galam dia 8-10 / 4 m 11,000.00 11,000.00
0.0075 M3 Kayu Bekisting 1,850,000.00 13,875.00
0.0200 M3 Kayu Bekisting 1,850,000.00 37,000.00
0.1750 Lbr Plywood 9 mm 105,000.00 18,375.00
0.3000 OH Pekerja Biasa 60,000.00 - 18,000.00
0.3300 OH Tukang Kayu 80,000.00 - 26,400.00
0.0330 OH Kepala Tukang 90,000.00 - 2,970.00
0.0050 OH Mandor 100,000.00 - 500.00
Jadi untuk 2x Pakai - - 136,120.00
9 Membuat Beton dengan Mutu K. 250 m2
1.0500 m3 Beton Ready Mix K-250 - 1,290,000.00 1,354,500.00
1.0000 Ls Alat bantu - 500.00 500.00
1.0000 Ls Biaya Tes kubus - 3,500.00 3,500.00
1.0000 Ls Perawatan beton 3,000.00 3,000.00
1.6000 OH Pekerja Biasa 60,000.00 - 96,000.00
0.8000 OH Tukang Batu 80,000.00 - 64,000.00
0.2000 OH Kepala Tukang 90,000.00 - 18,000.00
0.2000 OH Mandor 100,000.00 - 20,000.00
NO URAIAN SATUAN UPAH UNIT PRICE JUMLAH

- - 1,559,500.00
DAFTAR HARGA BAHAN DAN UPAH

KEGIATAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA


PEKERJAAN : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
LOKASI : JALAN HARMONIKA SAMARINDA
TAHUN ANGGARAN : 2011

HARGA SATUAN
NO UPAH / BAHAN / ALAT SATUAN
( Rp )

A UPAH
1 Pekerja OH 60,000.00
2 Tukang OH 80,000.00
3 Kepala Tukang OH 90,000.00
4 Mandor OH 100,000.00

B BAHAN
1 Tanah Urug Pilihan M3 45,800.00
2 Pasir Urug (Mahakam) M3 105,000.00
3 Pasir Pasang M3 110,000.00
4 Pasir beton cor M3 150,000.00
5 Koral beton M3 175,000.00
6 Batu Gunung M3 175,000.00
7 Batu Padas M3 110,000.00
8 Semen PC ( 50 Kg ) Zak 75,000.00
9 Besi Polos Kg 12,500.00
10 Besi ulir Kg 13,000.00
11 Kawat Bendrat Kg 17,500.00
12 Paku Biasa Kg 17,500.00
13 Paku Plywood Kg 17,500.00
14 Paku seng Kg 17,500.00
15 Seng BJLS 20 Lbr 45,000.00
16 Seng Plat 3' x 6' BJLS 28 Lbr 65,000.00
17 Beton readymix K-250 M3 1,290,000.00
18 Balok Meranti M3 2,200,000.00
19 Kayu Bekisting M3 1,850,000.00
20 Meni besi Ltr 12,500.00
21 plywood 9mm m2 105,000.00
22 Dolken Kayu Galam dia 8-10 / 4 m btg 11,000.00
23 Minyak Bekisting ltr 5,000.00
24 Tiang pancang 25x25x240cm btg 200,000.00
Formulir Rekapitulasi Perhitungan Tingkat Komponen Dalam Negeri ( TKDN )

Nilai Gabungan Barang/Jasa


TKDN
(Rp)
Uraian Pekerjaan TOTAL Barang/
DN LN Ribu % Jasa Gabungan
(Rp) KDN
(1) (2) (3) (4) (5) (7) (8)
BARANG
I. Material Langsung (Bahan Baku) 1,058,106,650.00 1,058,106,650.00 65.50
II. Peralatan (Barang Jadi) 88,848,650.00 88,848,650.00 5.50
A. Sub Total Barang 1,146,955,300.00 1,146,955,300.00 71.00 1,146,955,300.00 71.00
JASA
III. Manajemen Proyek dan
Perekayasaan 88,848,650.00 88,848,650.00 5.50
IV. Alat Kerja/Fasilitas Kerja 121,157,250.00 121,157,250.00 7.50
V. Konstruksi dan Fabrikasi
VI. Jasa Umum 258,468,800.00 258,468,800.00 16.00
B. Sub Total Jasa 468,474,700.00 468,474,700.00 29.00 468,474,700.00 29.00

C. TOTAL Biaya (A+B) 1,615,430,000.00 1,615,430,000.00 100.00


Formulasi perhitungan :

% TKDN (Gabungan Nilai Barang Total (3C) - Nilai Barang Luar Negeri (3B)
=
Barang dan Jasa Nilai Gabungan Barang dan Jasa (9C)

Nilai Jasa Total (8C) - Nilai Jasa Luar Negeri (8B)


Nilai Gabungan Barang dan Jasa (9C)

Samarinda, 24 Februari 2012


CV. HANDTER JAYA

ACHMAD BARKATI
Direktur
JADWAL WAKTU PELAKSANAAN
Kegiatan : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
Pekerjaan : PEMBANGUNAN GEDUNG KANTOR LEGIUN VETERAN REPUBLIK INDONESIA
Lokasi Jl. Harmonika, Samarinda
Tahun Anggaran 2011

JADWAL WAKTU PELAKSANAAN 120 HARI KALENDER


Bobot
NO URAIAN PEKERJAAN BULAN KE- 1 BULAN KE -2 BULAN KE -3 KET.

(%) 1 2 3 4 5 6 7 8 9 10 11 12

A. PEKERJAAN PERSIAPAN 5.21 1.30 1.30 1.30 1.30 100

B PEKERJAAN TANAH 6.84 2.28 2.28 2.28 50

C PEKERJAAN STRUKTUR 87.95 9.77 9.77 9.77 9.77 9.77 9.77 9.77 9.77 9.77
0

TOTAL BOBOT ( % ) 100.00


RENCANA KEMAJUAN 1.30 1.30 3.58 13.35 12.05 9.77 9.77 9.77 9.77 9.77 9.77 9.77
KOMULATIF RENCANA KEMAJUAN ( % ) 0 1.30 2.60 6.19 19.54 31.59 41.37 51.14 60.91 70.68 80.46 90.23 100.00

Samarinda, 24 Februari 2012

CV. HANDTER JAYA

ACHMAD BARKATI
Direktur
BACK UP PROGRESS (MINGGU-I)

KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN 0

PERHITUNGAN
No KEGIATAN / SKETSA GAMBAR p x l x t x Jml VOLUME SAT. KETERANGAN

1 Pembongkaran & pembersihan sisa pekerjaan x x x 0.50 ls

2 Pasang pagar pengaman & serobong kerja x x x 0.35 unit

Diperiksa oleh: Dibuat oleh:


Konsultan Supervisi Kontraktor Pelaksana
PT. RANIA TAMA CONSULTANT PT. NAJLA SYAKIRA

SAIFUL ANWAR A.Md SIGIT SANTOSO, ST


Inspector Site Manager
BACK UP PROGRESS (MINGGU-I)

KEGIATAN 0
PEKERJAAN 0
LOKASI 0
TAHUN ANGGARAN NO. KONTRAK ADD.
PEKERJAAN : PEKERJAAN TANAH

PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x l x t x Jml

1 Pek. Galian pondasi KP1 1.25 x 1.25 x 1.2 x 7 13.125 m3

2 Pek. Galian pondasi KP2 1 x 1 x 1.2 x 3 3.6 m3

TOTAL 16.725 m3

PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x l x t x Jml

1 Pek. Bongkar Beton P1 1.25 x 1.25 x 0.05 x 7 0.55 m3

2 KP 2 1 x 1 x 0.05 x 3 0.15 m3

TOTAL 0.70 m3

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


Konsultan Pengawas Kontraktor
KOORDINATOR LAPANGAN RANIATAMA CONSULTANT TANJUNG JAYA BUMI

( S.USMAN EFFENDI ) ( AGUNG IRFANDY, ST ) ( CRISTIANO, ST )


NIP.19590920198403 1 009
BACK UP PROGRESS (MINGGU-I)

KEGIATAN
PEKERJAAN
LOKASI
TAHUN ANGGARAN
PEKERJAAN

PERHITUNGAN
No SKETSA GAMBAR VOLUME SAT. KETERANGAN
p x titik x Jml

1 Pek. Tiang pancang ulin 10/10 -8 m 8 1 x 5 x 5 200 m'

Disetujui oleh : Diperiksa oleh : Dibuat oleh :


Konsultan Pengawas Kontraktor
KOORDINATOR LAPANGAN RANIATAMA CONSULTANT TANJUNG JAYA BUMI

( S.USMAN EFFENDI) ( AGUNG IRFANDY, ST ) ( CRISTIANO, ST )


NIP. 196801111989021 002
STRUKTUR ORGANISASI CV.HANDTER JAYA

AHMAD BARKATI
Direktur

Rijalul Fikry Sjaf.ST Lola Nurfada. SE


Site Manager Site Manager

Agung Irfandy.ST Saipul Anwar. ST M.Aviv Kurniawan. ST Ir.Sudadi


Pelaksana Surveyor Pelaksana K3 Draft Man

Muh. Asdi Aziz .ST


Pelaksana
Aidil Adha
Logistik
Nur Rahman Dani
Logistik
SCHEDULE PEKERJAAN

KEGIATAN #REF!
PAKET PEKERJAAN 0
LOKASI #REF!
TAHUN ANGGARAN 0

BOBOT WAKTU PELAKSANAAN (120 HARI KALENDER)


NO JENIS PEKERJAAN
(%) BULAN 1 BULAN 2 BULAN 3 BULAN 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
15-21maret 22-28maret 29-5 april 6-12 april 13-19 april 20-26 april 27-3 mei 4-10 mei 11-17 mei 18-24 mei 25-31 mei 1-7 juni 8-14 juni 15-21 juni 22-28 juni 29-5 juli

A 0
1. 0 hr Err:508 Err:508 Err:508 100
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!

B #REF!
### #REF! hr #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF!
### #REF! hr #REF! #REF!
### #REF! hr #REF! #REF! #REF!
50
C 0
3.1 0 hr #REF! #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!
### #REF! hr #REF! #REF! #REF! #REF! #REF!

RENCANA

Total #REF! 0
Weekly Progress (%)
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Komulatif Progress (%)
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
Progress Actual (%)

Kumulatif Progress Actual

(%)
Deviasi ( % )
Disetujui oleh : Disetujui oleh : Diperiksa oleh : Dibuat oleh :
Pelaksana Teknis Kegiatan Pengeloloa Keuangan Bantuan Hibah Konsultan Pengawas Kontraktor
Pembnagunan Gedung Legiun Veteran Republik Indonesia Kegiatan Pembangunan gedung CV.BIOLA TEKNIK CONSULTANT CV.HANDTER JAYA
Legiun Veteran Republik Indonesia

( (HERIANSYAH, ST) (AMIN JAMA) ( ABANG MS. ST ) ( RIJALUL FIKRY, ST )


NIP.19780109200901 1 002 Pengelola Anggaran Team Leader Site Manager

Anda mungkin juga menyukai